Pandemic Darlings The pandemic economy, in original documents
Home Court filings Full Docket Federal Contractor Mandates Missouri Edmo 4 21 Cv 01300 8Th 21 3725 Doc 029 Att 0

Court filing

Missouri Edmo 4 21 Cv 01300 8Th 21 3725 Doc 029 Att 0

Filed December 10, 2021 in Federal Contractor Mandates; one of 57 filings from this case.

Record facts

CourtU.S. Court of Appeals for the Eighth Circuit
Filed2021-12-10

U.S. Court of Appeals for the Eighth Circuit · No. 4:21-cv-01300-DDN · Doc. 29 · 2021-12-10 · Docket on CourtListener

Full text

IN THE UNITED STATES DISTRICT COURT 
FOR THE EASTERN DISTRICT OF MISSOURI 
EASTERN DIVISION 
 
STATE OF MISSOURI, et al., 
Plaintiffs, 
v. 
JOSEPH R. BIDEN, et al. 
Defendants. 
No. 4:21-cv-01300-DDN 
 
 
 
 
 
DEFENDANTS’ SUPPLEMENTAL BRIEFING 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 1 of 27 PageID #: 896

i 
TABLE OF CONTENTS 
TABLE OF CONTENTS .......................................................................................................... i 
INTRODUCTION ................................................................................................................... 1 
PROCEDURAL HISTORY ..................................................................................................... 2 
LEGAL STANDARDS ........................................................................................................... 3 
ARGUMENT .......................................................................................................................... 3 
I. 
The Court should deny all of Plaintiffs’ claims............................................................. 3 
A. 
Plaintiffs’ first claim fails as a matter of law. .......................................... 3 
B. 
Counts Five through Seven are moot and meritless ................................. 6 
C. 
Challenges to the FAR Memo fail (Claims 8 & 9) ..................................10 
D. 
Plaintiffs’ constitutional claims are meritless .........................................12 
II. 
Most Plaintiffs lack standing and none face irreparable harm.......................................15 
III. The equities and the public interest weigh against injunctive relief. .............................19 
IV. In all events, any relief should be limited. ...................................................................20 
CONCLUSION ......................................................................................................................20 
 
 
 
 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 2 of 27 PageID #: 897

ii 
TABLE OF AUTHORITIES 
 
CASES 
Adarand Constructors, Inc. v. Pena, 
515 U.S. 200 (1995)............................................................................................................16 
AFL-CIO v. Kahn, 
618 F.2d 784 (D.C. Cir. 1979) ..................................................................................... 3, 5, 14 
Akiachak Native Cmty. v. U.S. Dep’t of Interior, 
827 F.3d 100 (D.C. Cir. 2016) ...........................................................................................6, 8 
Ala. Ass. of Realtors v. HHS, 
141 S. Ct. 2485 (2021) ......................................................................................................... 5 
Am. Fed’n of Gov’t Emps., AFL-CIO v. Carmen, 
669 F.2d 815 (D.C. Cir. 1981) .............................................................................................. 5 
Arbitraje Casa de Cambio S.A. de CV v. United States, 
79 Fed. Cl. 235 (2007) ......................................................................................................... 5 
Benning v. Georgia, 
391 F.3d 1299 (11th Cir. 2004) ...........................................................................................13 
Chamber of Com. of U.S. v. Napolitano, 
648 F. Supp. 2d 726 (D. Md. 2009) ...................................................................................... 5 
City of Albuquerque v. U.S. Dep’t of Interior, 
379 F.3d 901 (10th Cir. 2004) ......................................................................................... 5, 14 
Cmty. of Christ Copyright Corp. v. Devon Park Restoration Branch of Jesus Christ's Church, 
634 F.3d 1005 (8th Cir. 2011) .............................................................................................. 3 
DaimlerChrysler Corp. v. Cuno, 
547 U.S. 332 (2006)............................................................................................................10 
Dalton v. Specter, 
511 U.S. 462 (1994)...................................................................................................... 3, 7, 8 
Dep’t of Homeland Sec. v. Regents of the Univ. of California, 
140 S. Ct. 1891 (2020) ......................................................................................................... 7 
Florida v. HHS, 
— F.4th —, 2021 WL 5768796 (11th Cir, Dec. 6, 2021) ........................................ 4, 5, 10, 19 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 3 of 27 PageID #: 898

iii 
Florida ex rel. Cobb v. U.S. Dep’t of Justice, 
No. 5:10-cv-118, 2010 WL 3211992 (N.D. Fla. Aug. 12, 2010), aff'd, 
440 F. App'x 860 (11th Cir. 2011) .......................................................................................16 
Franklin v. Massachusetts, 
505 U.S. 788 (1992)...................................................................................................... 3, 7, 8 
Gill v. Whitford, 
138 S. Ct. 1916 (2018) ........................................................................................................20 
Gov’t of Manitoba v. Bernhardt, 
923 F.3d 173 (D.C. Cir. 2019) ....................................................................................... 15, 16 
Iowa ex rel. Miller v. Block, 
771 F.2d 347 (8th Cir. 1985) ...............................................................................................15 
Kentucky v. Biden, 
No. 3:21-CV-00055-GFVT, 2021 WL 5587446 (E.D. Ky. Nov. 30, 2021) .............9, 10, 11, 13 
Ky. Dep’t of Hum. Resources v. Donovan, 
704 F.2d 288 (6th Cir. 1983) ...............................................................................................13 
Liberty Mut. Ins. Co. v. Friedman, 
639 F.2d 164 (4th Cir. 1981) ................................................................................................ 3 
Lujan v. Defs. of Wildlife, 
504 U.S. 555 (1992)...........................................................................................14, 15, 18, 19 
Madsen v. Women’s Health Ctr. Inc., 
512 U.S. 753 (1994)............................................................................................................20 
Massachusetts v. EPA, 
549 U.S. 497 (2007)...................................................................................................... 15, 16 
Massachusetts v. Mellon, 
262 US 447 (1923)..............................................................................................................15 
Nken v. Holder, 
556 U.S. 418 (2009)............................................................................................................19 
NRDC v. U.S. Dep’t of State, 
658 F. Supp. 2d 105 (D.D.C. 2009) ...................................................................................7, 8 
Oklahoma ex rel. Pruitt v. Sebelius, 
No. 11-30, 2013 WL 4052610 (E.D. Okla. Aug. 12, 2013) ...................................................16 
Pennhurst State Sch. & Hosp. v. Halderman, 
451 U.S. 1 (1981) ...............................................................................................................13 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 4 of 27 PageID #: 899

iv 
Perkins v. Lukens Steel Co., 
310 U.S. 113 (1940)............................................................................................................. 1 
Printz v. United States, 
521 U.S. 898 (1997)............................................................................................................12 
Roudachevski v. All-Am. Care Centers, Inc., 
648 F.3d 701 (8th Cir. 2011) ...............................................................................................15 
Tulare Cty. v. Bush, 
185 F. Supp. 2d 18 (D.D.C. 2001), aff'd, 306 F.3d 1138 (D.C. Cir. 2002) .............................. 8 
UAW v. Chao, 
325 F.3d 360, (D.C. Cir. 2003) ...................................................................................... 3, 4, 5 
United States v. Brewer, 
766 F.3d 884 (8th Cir. 2014) ................................................................................................ 9 
Valley Forge Christian Coll. v. Ams. United for Separation of Church & State, Inc., 
454 U.S. 464 (1982)............................................................................................................12 
Wachovia Bank v. Watters, 
431 F.3d 556 (6th Cir. 2005), aff'd, 550 U.S. 1 (2007) ..........................................................12 
Wyoming v. U.S. Dep’t of the Interior, 
674 F.3d 1220 (10th Cir. 2012) ...........................................................................................16 
Youngstown Sheet & Tube v. Sawyer, 
343 U.S. 579 (1952)............................................................................................................. 3 
STATUTES 
3 U.S.C. § 301 ......................................................................................................................... 7 
5 U.S.C. § 553 ......................................................................................................................2, 8 
5 U.S.C. § 704 ........................................................................................................................10 
5 U.S.C. § 706 ......................................................................................................................2, 6 
40 U.S.C. § 101 ....................................................................................................................... 2 
40 U.S.C. § 121 ....................................................................................................................2, 3 
40 U.S.C. § 1707 ..................................................................................................................... 8 
41 U.S.C. § 1707 ........................................................................................................ 2, 8, 9, 11 
 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 5 of 27 PageID #: 900

v 
REGULATIONS 
Determination of the Acting OMB Director Regarding the Revised Safer Federal Workforce 
Task Force Guidance for Federal Contractors and the Revised Economy & Efficiency 
Analysis (Nov. OMB Determination), 
86 Fed. Reg. 63,418 (2021) ...............................................................................................6, 9 
Ensuring Adequate COVID Safety Protocols for Federal Contractors, 
Exec. Order 14,042, 86 Fed. Reg. 50,985 (2021) .............................................................. 4, 18 
Federal Acquisition Regulation; Contractor Responsibility, Labor Relations Costs, and Costs 
Relating to Legal and Other Proceedings, 
66 Fed. Reg. 17,754 (2001) .................................................................................................. 9 
Federal Acquisition Regulation: Non-Retaliation for Disclosure of Compensation  
Information, 
81 Fed. Reg. 67,732 (2016) .................................................................................................. 9 
UNITED STATES CONSTITUTION 
U.S. Const. art. II....................................................................................................................12 
U.S. Const. art. IV, § 3............................................................................................................12 
OTHER AUTHORITIES 
DOE Order,  
https://perma.cc/3LWH-CTTW ...........................................................................................18 
FAR Open Cases Report,  
https://www.acq.osd.mil/dpap/dars/opencases/farcasenum/far.pdf ........................................10 
FDA, “FDA Approves First COVID-19 Vaccine,”  
https://perma.cc/TNN7-QQD8 ........................................................................................ 9, 18 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 6 of 27 PageID #: 901

IN THE UNITED STATES DISTRICT COURT 
FOR THE EASTERN DISTRICT OF MISSOURI 
EASTERN DIVISION 
 
STATE OF MISSOURI, et al., 
Plaintiffs, 
v. 
JOSEPH R. BIDEN, et al. 
Defendants. 
No. 4:21-cv-01300-DDN 
DEFENDANTS’ SUPPLEMENTAL BRIEFING 
INTRODUCTION 
“Like private individuals and businesses, the Government enjoys the unrestricted power to 
produce its own supplies, to determine those with whom it will deal, and to fix the terms and 
conditions upon which it will make needed purchases.” Perkins v. Lukens Steel Co., 310 U.S. 113, 
127 (1940). Contrary to the manner in which Plaintiffs have framed this dispute, EO 14,042 and 
its implementing regulations are not actions taken by the President in a regulatory capacity. In-
stead, they are properly viewed as the actions of the CEO of the Executive Branch, issuing a policy 
for how the government will act as a market participant—exactly the type of action Presidents 
have taken, Congress has accepted, and courts have affirmed for half a century.  
As described in our prior briefs and as set forth in more detail below, Plaintiffs have failed 
to carry their heavy burden to justify preliminary relief, let alone ultimate, permanent relief under 
Rule 65. If granted, the relief Plaintiffs seek would turn our federal system on its head by prevent-
ing the United States from entering contracts with third parties on its own terms.1 This Court 
                                              
1 On December 7, 2021, the United States District Court for the Southern District of 
Georgia issued a nationwide preliminary injunction enjoining the federal government from 
enforcing the vaccine mandate for federal contractors and subcontractors.  See Order, Georgia v. 
Biden, No. 1:21-cv-163 (S.D. Ga.), ECF No. 94.  Defendants are taking immediate steps to comply 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 7 of 27 PageID #: 902

2 
should not embrace that result and, accordingly, should deny Plaintiffs’ motion. 
PROCEDURAL HISTORY 
Defendants refer to their opposition to Plaintiffs’ motion for a preliminary injunction and 
to the parties’ joint statement of facts for the relevant factual background. Defs.’ Opp’n to Pls.’ 
Mot. for Prelim. Inj., ECF No 20 (Defs.’ Opp’n); Jt. Stmt. of Facts, ECF No. 27.  
Plaintiffs bring 12 claims against Defendants. Compl. ¶¶ 91–186, ECF No. 1. In Count One, 
they challenge the President’s issuance of Executive Order 14,042 (EO 14,042 or the Executive 
Order) and the ensuing initial determination by the Acting Director of the Office of Management 
and Budget (OMB) in September 2021 (September OMB Determination or September Determi-
nation) as violating the Federal Property and Administrative Services Act (Procurement Act” or 
FPASA), 40 U.S.C. §§ 101, 121. Compl. ¶¶ 91–96. In Counts Two, Five, Six, and Seven, they 
challenge the OMB’s September Determination as violative of the Administrative Procedure Act 
(APA), 5 U.S.C. §§ 553, 706, and the procedural requirements in the Procurement Policy Act, 41 
U.S.C. § 1707. Compl. ¶¶ 98–104, 113–45. In Counts Eight and Nine, they claim that a memo 
published by the Federal Acquisition Regulatory Council (the FAR Memo) that provided initial 
direction for agencies to implement the requirements in EO 14,042 violated the APA and the Pro-
curement Policy Act. Compl. ¶¶ 147–157. Finally, in Counts Three, Four, Ten, Eleven, and 
Twelve, Plaintiffs allege that EO 14,042 and the ensuing executive action violate the Constitution 
in various ways. Compl. ¶¶ 105–112, 158–86. 
                                              
with that preliminary injunction. The information provided in this supplemental brief describes the 
state of affairs before the nationwide preliminary injunction was issued by that court. This 
nationwide injunction currently prevents Defendants from enforcing the clause at issue in this 
lawsuit. So long as that nationwide injunction remains in place, there is no need for this Court is 
issue an expedited ruling. And if the Georgia district court ultimately orders a permanent injunction 
with nationwide effect, and that judgment is affirmed on appeal, this case would be moot, obviating 
the need for this Court to rule at all. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 8 of 27 PageID #: 903

3 
On November 4, 2021, Plaintiffs moved for a preliminary injunction. Pls.’ Mot. for Prelim. 
Inj., ECF No. 8, to which Defendants responded, Defs’ Opp’n. On November 24, 2021, this Court 
ordered that it would consolidate the preliminary injunction proceedings with a trial on the merits 
pursuant to Rule 65(a)(2) of the Federal Rules of Civil Procedure and ordered the parties to submit 
a joint statement of undisputed material facts and supplemental memoranda. Order, ECF No. 26.  
LEGAL STANDARDS 
“To obtain a permanent injunction, [a plaintiff is] required to show: (1) its actual success 
on the merits; (2) that it faces irreparable harm; (3) that the harm to it outweighs any possible harm 
to others; and (4) that an injunction serves the public interest.” Cmty. of Christ Copyright Corp. v. 
Devon Park Restoration Branch of Jesus Christ's Church, 634 F.3d 1005, 1012 (8th Cir. 2011). 
Plaintiffs fail every element. 
ARGUMENT 
I. 
The Court should deny all of Plaintiffs’ claims. 
A. 
Plaintiffs’ first claim fails as a matter of law.  
Plaintiffs’ first claim is not a proper cause of action. Plaintiffs attempt to bring a stand-
alone claim that the President violated the Procurement Act, but identify no statute that authorizes 
such cause of action. While Plaintiffs might be able to raise an ultra vires claim, they have not 
done so. Compare Am. Compl. at Count 10, Florida v. Nelson, No. 8:21-cv-2524-SDM-TGW, 
(M.D. Fla. Nov. 29, 2021), ECF No. 23 (properly pleading an ultra vires claim). Moreover the 
APA does not apply to the President. See Franklin v. Massachusetts, 505 U.S. 788, 800–01 (1992); 
Dalton v. Specter, 511 U.S. 462, 470 (1994)). Count One can be dismissed for this reason alone. 
Count One also fails on the merits. Plaintiffs argue that when the president issued Execu-
tive Order 14,042, he exceeded his authority under the Procurement Act. That is wrong. “‘When 
the President acts pursuant to an express or implied authorization of Congress, his authority is at 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 9 of 27 PageID #: 904

4 
its maximum.’” AFL-CIO v. Kahn, 618 F.2d 784, 787 n. 13 (D.C. Cir. 1979) (quoting Youngstown 
Sheet & Tube v. Sawyer, 343 U.S. 579, 635–36 (1952) (Jackson, J., concurring)).  
Congress expressly authorized the President to prescribe federal procurement policies and 
directives so long as those policies are “consistent” with the Procurement Act. 40 U.S.C. § 121(a). 
Courts have approved, so long as those policies and directives are “reasonably related to the Pro-
curement Act’s purpose of ensuring efficiency and economy in government procurement.” Liberty 
Mut. Ins. Co. v. Friedman, 639 F.2d 164, 170 (4th Cir. 1981); accord UAW v. Chao, 325 F.3d 
360, (D.C. Cir. 2003); see also Defs.’ Opp’n at 10–16. Courts have “emphasized the necessary 
flexibility and ‘broad-ranging authority’” that the Act provides and have described judicial review 
as “lenient.” UAW-Lab. Emp. & Training Corp. v. Chao, 325 F.3d 360, 366 (D.C. Cir. 2003).  
The President here set a government-wide policy2 of requiring certain contractors to in-
clude a clause requiring compliance with Task Force Guidelines that the OMB Director deter-
mines would promote economy and efficiency in procurement. EO, § 2(a). Workplace safeguards 
aimed at preventing COVID-19’s spread will “decrease worker absence, reduce labor costs, and 
improve the efficiency of contractors and subcontractors at sites where they are performing work 
for the Federal Government.” EO 14,042 § 1; see also Determination of the Acting OMB Director 
Regarding the Revised Safer Federal Workforce Task Force Guidance for Federal Contractors and 
the Revised Economy & Efficiency Analysis, 86 Fed. Reg. 63,418, 63,421 (2021) (Nov. OMB 
                                              
2 Plaintiffs also argue under Count Seven that EO 14,042 is a “regulation,” Compl. ¶ 140, 
but that ignores that the EO directs other agencies to exercise regulatory authority.  Specifically, 
it directs the FAR Council to issue a government-wide regulation and directs agencies “to exercise 
any applicable authority” to implement this policy in the meantime.  EO § 14,042, § 3; see Defs.’ 
Opp’n at 16–17. The Executive Order sets a government-wide policy and directive, which is 
plainly allowed under the text of the Procurement Act; it is not a regulation. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 10 of 27 PageID #: 905

5 
Determination). While Plaintiffs “raise[] a variety of arguments [that] disagree with those conclu-
sions,” Plaintiffs “essentially seeks to substitute [their] views on epidemiology for the [President’s] 
judgment.” Fla. v. HHS, — F.4th —, 2021 WL 5768796, at *15 (11th Cir, Dec. 6, 2021). The 
types of arguments raised by Plaintiffs are not enough to prove that the Presidential policy and 
directives announced in EO 14,042 lacked an appropriate nexus to economy and efficiency in 
government procurement.  
Plaintiffs appear to invoke the major questions doctrine by arguing that because the gov-
ernment has not previously required vaccinations for its contracting workforce, there must be “a 
clear statement from Congress” specifically authorizing a “contractor vaccine mandate” for the 
policy to be valid. Compl. ¶ 95. But this argument ignores that Congress provided a broad grant 
of power in the Procurement Act. “[B]y its very nature, a broad grant of authority . . . does not 
require an indication that specific activities are permitted.” Fla., 2021 WL 5768796 at *12 (also 
explaining why Alabama Association of Realtors v. HHS, 141 S. Ct. 2485 (2021), is not relevant). 
First, the exercise of Procurement Act authority to require contract provisions that have 
economic and political significance is nothing new. See, e.g., City of Albuquerque v. U.S. Dep’t of 
Interior, 379 F.3d 901 (10th Cir. 2004) (urban renewal); Chao, 325 F.3d 360 (collective bargaining 
rights); Am. Fed’n of Gov’t Emps., AFL-CIO v. Carmen, 669 F.2d 815 (D.C. Cir. 1981) (energy 
conservation during an oil crisis); Kahn, 618 F.2d at 790 (noting multiple Presidents “promi-
nent[ly]” used FPASA to impose “a series of anti-discrimination requirements for Government 
contractors”); Chamber of Com. of U.S. v. Napolitano, 648 F. Supp. 2d 726, 729 (D. Md. 2009) 
(employee work eligibility and immigration status). Every single one of these procurement policies 
touched on a significant political issue, and some had far-reaching economic consequences. But 
those contract clauses, like the one here, do not regulate third parties, and apply only to those 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 11 of 27 PageID #: 906

6 
entities that choose to do business with the federal government.  
Second, the clause at issue in this case—just like the historical examples—does not signif-
icantly alter the balance between federal and state power. When contracting with other parties, 
“the sovereign steps off the throne and engages . . . as private parties, individuals or corporations” 
in the marketplace. Arbitraje Casa de Cambio S.A. de CV v. United States, 79 Fed. Cl. 235, 240–
41 (2007). When the federal government and states enter into contracts, they are acting as market 
participants, not in their respective roles in our federal system. 
Third, Congress has long understood and accepted that the Procurement Act granted broad 
authority to the President. Defs.’ Opp’n at 13. For these reasons, the major questions doctrine does 
not apply, and the President’s EO falls comfortably within the scope of Congress’s authorization. 
B. 
Counts Five through Seven are moot and meritless (OMB Determination) 
1. 
Plaintiffs’ challenges to the OMB determination are not justiciable. 
In Counts Six and Seven, Plaintiffs allege that the September OMB Determination was not 
the product of “reasoned decisionmaking,” as required under the APA, 5 U.S.C. § 706(2), and was 
issued in excess of OMB’s authority. Compl. ¶¶ 113–46. As Defendants explained in their oppo-
sition brief, however, these claims are now moot because the September OMB Determination has 
been rescinded and superseded by OMB’s November Determination, which extended the vaccina-
tion deadline for covered contract employees to January 18, 2022, and explained in more detail 
why the Acting OMB Director determined that the Task Force Guidance promoted economy and 
efficiency in federal contracting.3 Defs.’ Opp’n at 19–20; see Akiachak Native Cmty. v. U.S. Dep’t 
                                              
3 This Court requested supplemental briefing on claims other than “those founded on the 
federal Administrative Procedure Act,” Order, ECF No. 26, which are Counts Six, Seven, and 
Eight, Compl. ¶¶ 121–50. The parties agree, however, that the Court can rule on threshold legal 
issues that require no further factual development like whether a challenge to the September OMB 
Determination is moot or whether the September OMB Determination is subject to the APA at all. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 12 of 27 PageID #: 907

7 
of Interior, 827 F.3d 100, 113 (D.C. Cir. 2016) (collecting cases demonstrating that it is an “un-
controversial and well-settled principle of law” that “when an agency has rescinded and replaced 
a challenged regulation, litigation over the legality of the original regulation becomes moot”).  
Plaintiffs argue that the September OMB Determination is somehow not moot because 
OMB in effect reinstated it in its November Determination. Pls.’ Reply at 8, ECF No. 23. As an 
initial matter, the November Determination substantively differs from the September Determina-
tion by extending the vaccination deadline for covered contract employees. 86 FR at 63,423. Fur-
ther, Plaintiffs’ APA claim in Count Six solely focuses on whether the September OMB 
Determination “ignored important aspects of the problem,” Compl. ¶¶ 128, 130–133, and whether 
it provided any explanation for approving the Task Force Guidance, Compl. ¶ 129; see also id. 
¶ 144 (Count Seven) (describing the content of OMB’s prior determination in arguing that the 
Determination exceeds OMB’s delegated Presidential Authority). The OMB Director’s additional 
explanation in the November Determination therefore eviscerates the allegations in Count Six and 
materially bears on Count Seven, and it therefore makes little sense why Plaintiffs continue to 
press these claims instead of amending their Complaint as plaintiffs in many other similar lawsuits 
have done. See, e.g., Am. Compl., Florida v. Nelson, 8:21-cv-2524 (M.D. Fla.), ECF No. 23; Am. 
Compl., Georgia v. Biden; 1:21-cv-163 (S.D. Ga.), ECF No. 54; Am. Compl., Louisiana v. Biden, 
1:21-cv-3867 (W.D. La.), ECF No. 21; Am. Compl., Kentucky v. Biden, 3:21-cv-00055 (E.D. Ky.), 
ECF No. 22. Plaintiffs failed to amend their claim to challenge the operative guidance. They chal-
lenges to rescinded guidance is moot and must be dismissed. 
                                              
Should the Court agree with Defendants’ arguments, then the Court should dismiss those claims 
in their entirety. Pursuant to the Court’s order, this brief does not discuss merits of those Counts.   
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 13 of 27 PageID #: 908

8 
Even if Plaintiffs had a live claim challenging the September Determination under the 
APA, the claim would still not be subject to judicial review because the OMB Director was acting 
pursuant to presidential authority delegated under 3 U.S.C. § 301 and, therefore, did not engage in 
agency action subject to APA review. NRDC v. U.S. Dep’t of State, 658 F. Supp. 2d 105, 109 
(D.D.C. 2009) (citing Franklin v. Massachusetts, 505 U.S. 788, 800–01 (1992); Dalton v. Specter, 
511 U.S. 462, 470 (1994)); see also Dep’t of Homeland Sec. v. Regents of the Univ. of California, 
140 S. Ct. 1891, 1908 (2020) (recognizing that an “agency can deal with the problem afresh by 
taking new agency action” (internal quotation marks omitted)). 
Plaintiffs do not challenge the President’s ability to delegate, pursuant to 3 U.S.C. § 301, 
the decision of whether the Guidelines promote economy and efficiency to the OMB Director. Nor 
do Plaintiffs cite any authority for the proposition that presidential action delegated pursuant to 
Section 301 is reviewable under the APA. Rather, Plaintiffs claim in circular fashion that because 
OMB is an agency, it must be engaging in agency action, thus ignoring the distinction between 
Presidential and Congressional authority. Adopting Plaintiffs’ position would deprive the Presi-
dent of the flexibility that Congress specifically provided in Section 301. “Any argument suggest-
ing that this action is agency action would suggest the absurd notion that all presidential actions 
must be carried out by the President him or herself in order to receive the deference Congress has 
chosen to give to presidential action.” Tulare Cty. v. Bush, 185 F. Supp. 2d 18, 28–28 (D.D.C. 
2001), aff’d, 306 F.3d 1138 (D.C. Cir. 2002).  
2. 
The OMB Determination complied with any applicable procedural 
requirements. 
In Counts Two and Five, Plaintiffs claim that OMB’s determination was issued without 
following the notice and comment procedures set forth in the Administrative Procedure Act, 5 
U.S.C. § 553, and the Procurement Policy Act, 40 U.S.C. § 1707. Here again, Plaintiffs’ claim is 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 14 of 27 PageID #: 909

9 
moot in light of the superseding November Determination, Akiachak, 827 F.3d at 113. Further, 
neither statute applies because the OMB Director was acting pursuant to Presidential authority, 
see NRDC, 658 F. Supp. 2d at 109; Franklin, 505 U.S. at 800–01; Dalton, 511 U.S. at 470, and 
the APA’s procedural requirements do not apply because that provision explicitly excludes any 
matter “relating to . . . contracts,” 5 U.S.C. § 553(a)(2). But to the extent that either statute applies, 
there can be no dispute that the November OMB Determination satisfied any notice requirement.  
Section 1707(b) requires notice of a “proposed procurement policy” to be published in the 
Federal Register and open for comment for at least 30 days. 41 U.S.C. § 1707(b). While Section 
1707 usually requires a procurement policy to “not take effect until 60 days after it is published 
for public comment in the Federal Register,” that requirement can be waived if “urgent and com-
pelling circumstances make compliance with the requirements impracticable.” 41 U.S.C. 
§ 1707(d). Similarly, under the APA, “[a]n agency may waive the requirements of a notice and 
comment period and the 30–day grace period before publication if the agency finds ‘good cause’ 
to do so.” United States v. Brewer, 766 F.3d 884, 888 (8th Cir. 2014) (internal citation omitted).  
The November OMB Determination easily satisfies the standards under both the APA and 
the Procurement Policy Act in describing the circumstances that required the November Determi-
nation take immediate effect while receiving comments prospectively. 86 Fed. Reg. at 63,423–24.  
An “important purpose of the [revised] Task Force Guidance” was to “align[] the vaccina-
tion deadline for Federal contractors with the vaccination deadline for private companies under 
recent regulatory actions,” which is January 18, 2022, to “make it easier for private employers to 
administer successful vaccination policies across their workforce.” Id. The government regularly 
invokes § 1707(d) to harmonize deadlines, enable regulatory certainty, and clarify compliance 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 15 of 27 PageID #: 910

10 
obligations, as it did here.4 Compare, e.g., FAR: Non-Retaliation for Disclosure of Compensation 
Information 81 FR 67,732 (Sept. 30, 2016), with 86 FR at 63,423–24; see also 66 FR 17,754, 
17,755 (Apr. 3, 2001) (invoking § 1707(d) to immediately stay a FAR rule because “otherwise the 
rule imposes burdens that the Government and contractors are not prepared to meet”).  
The November OMB Determination therefore satisfied any procedural requirements under 
the APA and Procurement Policy Act. See Kentucky v. Biden, No. 3:21-CV-00055-GFVT, 2021 
WL 5587446, at *12 (E.D. Ky. Nov. 30, 2021) (concluding that plaintiffs were unlikely to succeed 
in their challenge to the November OMB Determination because Defendants explained that “the 
compliance date was delayed to benefit federal contractors and ensure that they would have suffi-
cient time to comply with the mandate”); State of Fla. v. Dep’t of Health & Hum. Servs., No. 21-
14098-JJ, 2021 WL 5768796, at *14 (11th Cir. Dec. 6, 2021) (concluding that the Secretary’s 
reliance on the “urgency presented by the ongoing pandemic” constituted good cause to bypass 
APA notice-and-comment procedures in issuing an interim final rule requiring vaccinations for 
employees at facilities receiving Medicare and Medicaid funding).  
C. 
Challenges to the FAR Memo fail (Claims 8 & 9) 
In Counts Eight and Nine, Plaintiffs challenge the FAR Memo. That memo provides initial 
direction to and a sample for agencies to implement a COVID-19 safety clause in contracts while 
the FAR Council pursues a final rule on the subject. Compl. ¶¶ 147–57. As an initial matter, the 
                                              
4 Further, “[t]he pandemic continues to present an imminent threat to the health and safety 
of the American people,” 86 FR 63,423, and Plaintiffs’ contention that the government should 
have acted sooner to formulate a policy to require covered contractor vaccinations in this ever-
evolving environment rings hollow, see Pls.’ Reply at 14, particularly in light of the surge in cases 
due to the Delta variant of the virus strain and that the FDA approved the first full license for a 
COVID-19 vaccine on August 23, 2021, just two weeks before the President issued EO 14,042 on 
September 9. See FDA, “FDA Approves First 
COVID-19 Vaccine,” available 
at 
https://perma.cc/TNN7-QQD8. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 16 of 27 PageID #: 911

11 
FAR Memo is not subject to judicial review under the APA because it not a “final agency action,” 5 
5 U.S.C. § 704, and Plaintiffs’ APA claims in Counts Eight and Nine fail accordingly. Simply put, 
there is no dispute that the FAR Council is in the process of revising the FAR. See FAR Open 
Cases Report at 2, available at https://www.acq.osd.mil/dpap/dars/opencases/farcasenum/far.pdf 
(indicating that on September 29, 2021, the FAR Council opened a case to implement EO 14,042 
by drafting a proposed rule). When promulgated, the FAR Council’s amendment to the FAR will 
be a binding, government-wide regulation—the challenged interim guidance is not. Kentucky, 
2021 WL 5587446, at *11 (“[A]s Defendants correctly argue, Executive Order 14,042 instructed 
the FAR Council to ‘take initial steps to implement’ the contract clause. Therefore, the FAR Coun-
cil Guidance is not final agency action and is therefore not subject to judicial review under the 
APA.” (citation omitted)). Plaintiffs argue that because “[t]he clear intent of the EO is for agencies 
to use the FAR Guidance in their deviations,” the FAR Memo is legally binding. Pls.’ Reply at 14. 
But that is plainly incorrect. Nothing in the FAR Memo, or the Executive Order itself, requires 
agencies to implement the FAR COVID safety clause into their contracts; the clause is only a 
suggested template. Under Plaintiffs’ theory, any nonbinding guidance would turn into final 
agency action any time any agency followed that guidance. 
Section 1707’s procedural notice requirements also do not apply to the FAR Memo because 
it is, at most, nonbinding guidance, not “a procurement policy, regulation, procedure, or form” 
                                              
5 For similar reasons, Plaintiffs lack standing to challenge the FAR Memo, since invalidat-
ing the memo does not prevent agencies from pursuing bilateral modifications to existing contracts 
or prevent agencies from requiring the COVID safety clause in new contracts. See Defs.’ Opp’n 
at 23–24. Plaintiffs’ contention that they “clearly have standing to challenge the contractor man-
date, wherever it appears,” Pls.’ Reply at 15 n.7, is wholly unsupported. “Plaintiffs’ reading of [the 
law] to allow standing as to one claim to suffice for all claims arising from the same ‘nucleus of 
operative fact’ would have remarkable implications . . . . [S]tanding is not dispensed in gross.” 
DaimlerChrysler Corp. v. Cuno, 547 U.S. 332, 352 (2006). 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 17 of 27 PageID #: 912

12 
with “a significant effect beyond” the FAR Council’s operating procedures. 41 U.S.C. § 1707(b). 
Kentucky, 2021 WL 5587446, at *11 (“§ 1707 does not apply to the FAR Council Guidance be-
cause it constitutes nonbinding guidance that does not rise to the level of a ‘procurement policy, 
regulation, procedure, or form.’”). Plaintiffs thus cannot prevail on their Section 1707 claim in 
Count Nine. 
D. 
Plaintiffs’ constitutional claims are meritless (Counts 3, 4, and 10–12). 
1. 
The challenged actions do not violate the Tenth Amendment.  
Plaintiffs bring three counts under the Tenth Amendment: Count Three in which Plaintiffs 
allege that the Federal Government lacks the constitutional authority to include a contract clause 
requiring vaccination; Count Four in which Plaintiffs claim that contract clauses violate the anti-
commandeering doctrine; and Count Eleven which purports to be a stand-alone claim of Federal-
ism but is duplicative of Count Three. 
Counts Three and Eleven fail because when the government exercises power pursuant to 
an enumerated power, the Tenth Amendment is no bar. See, e.g., Wachovia Bank v. Watters, 431 
F.3d 556, 563 (6th Cir. 2005), aff’d, 550 U.S. 1 (2007). The challenged Presidential and agency 
actions were done pursuant to statutes validly enacted under Congress’s enumerated powers—
including the Property Clause—and the authority vested in the President by the Constitution. See 
U.S. CONST., art. IV, § 3, cl. 2; id. art. II; Valley Forge Christian Coll. v. Ams. United for Separa-
tion of Church & State, Inc., 454 U.S. 464, 480 (1982). Plaintiffs have not established that setting 
contract terms with third parties exceeds the Federal Government’s constitutional authority.  
In Count Four, Plaintiffs argue that it is unconstitutional for a contract between a state and 
the Federal Government to include a clause that compels a State to perform according to the terms 
of the contract—because requiring compliance would “commandeer” state officials. As explained 
in Defendants’ opposition, adopting Plaintiffs’ view of the anti-commandeering doctrine would 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 18 of 27 PageID #: 913

13 
render all contracts between federal and state governments unconstitutional. Defs.’ Opp’n at 29. 
The Federal Government is not commandeering anyone—if Plaintiff States do not wish to comply 
with a clause in a federal contract, they should not bid for or sign that contract. See Printz v. United 
States, 521 U.S. 898, 919 (1997); id. at 936 (O’Connor, J., concurring) (“Congress is also free to 
amend the interim program to provide for its continuance on a contractual basis with the States if 
it wishes, as it does with a number of other federal programs.”).  
2. 
The challenged actions do not violate the Spending Clause (Count 12)6 
Count Twelve claims that EO 14,042 and its implementing guidance violate the Spending 
Clause for three reasons: (1) the clause is an unconstitutional condition; (2) the clause is an am-
biguous condition; and (3) the clause is not related to “the federal interest in particular national 
projects or programs.” Compl. ¶¶ 177–186.7  
First, the only supposed “unconstitutional conditions” identified by Plaintiffs relate to the 
Tenth Amendment. Plaintiffs cite no case where any contract was found to have “unconstitutiona l 
conditions” under the Tenth Amendment. And regardless, that argument fails because there is no 
Tenth Amendment violation here. See supra I.D.1. 
Second, EO 14,042 and its implementing guidance unambiguously put contractors on no-
tice of any obligations. The case relied on Plaintiffs, Pennhurst State Sch. & Hosp. v. Halderman, 
451 U.S. 1, 17 (1981), requires nothing more. See Benning v. Georgia, 391 F.3d 1299, 1307 (11th 
Cir. 2004). Pennhurst’s holding does not apply to contracts because the contract itself puts the 
                                              
6 Plaintiffs’ preliminary-injunction brief for argued that the government violated the 
Commerce Clause. Pls.’ Mem. at 36–37. But no such claim appears in their complaint, and they 
withdrew that argument in reply. Pls.’ Reply, at 15, n.8. 
7 Plaintiffs argue in their reply that the challenged clause separately violates the Spending 
Clause because it is “unconstitutionally coercive.” Pls.’ Reply at 16. That claim is not properly 
before this court because Plaintiffs failed to raise in their opening brief, did not include such a 
claim in their complaint, and cite to no facts in the record support such a claim.  
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 19 of 27 PageID #: 914

14 
state on notice that there are conditions. Pennhurst concerned a federal grant program that “was 
unclear as to whether the states incurred any obligations at all by accepting federal funds.” See 
id. (emphasis added). But “the existence of the condition itself” here is “explicitly obvious” be-
cause it is included as a clause in the contract. Id. (emphasis added); see also Kentucky, 2021 WL 
5587446 at *7 n.9 (rejecting a similar Spending Clause argument on this basis); Ky. Dep’t of Hum. 
Resources v. Donovan, 704 F.2d 288, 299 n.17 (6th Cir. 1983). Federal contractors are capable of 
making informed, voluntary decisions to accept an obligation to comply with periodically updated 
guidelines. See Donovan, 704 F.2d at 299 (“Thus, the state voluntarily accepts the Secretary’s 
power to alter the program and require compliance.”). Evidence in this case show that states, like 
private parties, regularly agree to contracts with uncertain terms. See Pls.’ Mem., Ex. J, Decl. of 
Andrew Armacast, ECF No. 9-10 (describing an “Indefinite Delivery, Indefinite Quantity Subcon-
tract” with a private prime contractor, which by definition, has uncertain and indefinite terms). 
Third, Plaintiffs cite no case where a court has found federal contract obligations invalid 
under a federal interest requirement. And in any event, the President has already determined that 
including the COVID-19 safety clause is in the federal interest and the OMB Director provided a 
detailed explanation for why such a clause promotes federal interests. See Defs.’ Opp’n at 13–16. 
3. 
Plaintiffs’ nondelegation claim is unsupported (Count 10). 
Plaintiffs’ reply does not attempt to defend its nondelegation doctrine claim because it 
plainly fails under existing law. But as every court of appeals to consider the question has recog-
nized, the Procurement Act’s economy-and-efficiency standard supplies an intelligible principle 
that “can be applied generally to the President’s actions to determine whether those actions are 
within the legislative delegation.” Kahn, 618 F.2d at 793 n.51; see City of Albuquerque, 379 F.3d 
at 914–15 (similar). For all the reasons described in Defendant’s opposition, the Procurement Act 
easily satisfies this standard. See Defs.’ Opp’n at 32–35. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 20 of 27 PageID #: 915

15 
II. 
Most Plaintiffs lack standing and none face irreparable harm. 
Not all Plaintiffs in this case have demonstrated, with evidence, that they have standing. 
“Since they are not mere pleading requirements but rather an indispensable part of the plain-
tiff’s case, each element [of standing] must be supported in the same way as any other matter on 
which the plaintiff bears the burden of proof, i.e., with the manner and degree of evidence re-
quired at the successive stages of the litigation.” Lujan v. Defs. of Wildlife, 504 U.S. 555, 561 
(1992). “[T]he plaintiff[s] can no longer rest on such mere allegations, but must set forth by affi-
davit or other evidence specific facts.”8 Id. Moreover, “[t]o succeed in demonstrating a threat of 
irreparable harm, ‘a party must show that the harm is certain and great and of such imminence that 
there is a clear and present need for equitable relief.’” Roudachevski v. All-Am. Care Centers, Inc., 
648 F.3d 701, 706 (8th Cir. 2011) (citation omitted). Plaintiffs have not carried this burden here.  
First, Plaintiffs have no standing to bring parens patriae claims against the federal gov-
ernment for any claims and cannot claim irreparable injury from any purported harms to their 
citizens. See Defs.’ Opp’n at 39. The Eighth Circuit’s binding precedent is clear and has no excep-
tions: “A State does not have standing as parens patriae to bring an action against the Fed-
eral Government.” Iowa ex rel. Miller v. Block, 771 F.2d 347, 354 (8th Cir. 1985) (quoting 
Massachusetts v. Mellon, 262 US 447, 485–86 (1923)). Plaintiffs make no effort to distinguish that 
binding precedent. Instead, Plaintiffs suggest that a footnote in Massachusetts v. EPA overruled, 
sub silentio, the well-established principle that a state cannot bring a parens patriae suit against 
the federal government. Reply at 18 (citing Massachusetts, 549 U.S. 497, 519–22 & n.17 (2007)). 
                                              
8 While Defendants did not raise the issue of standing in their opposition to Plaintiffs’ 
motion for a preliminary injunction, it may do so now, especially given the higher evidentiary 
burden Plaintiffs must meet to receive a final judgment. Lujan, 504 U.S. at 561; see also City & 
Cty. of Denver v. Matsch, 635 F.2d 804, 807 (10th Cir. 1980) (examining the evidentiary threshold 
under Rule 65(a)(2)).. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 21 of 27 PageID #: 916

16 
The last time Missouri argued that Massachusetts allowed it to bring parens patriae claims 
against the federal argument, the D.C. Circuit soundly rejected Missouri’s arguments. See Gov’t 
of Manitoba v. Bernhardt, 923 F.3d 173, 176 (D.C. Cir. 2019). Missouri sought to challenge an 
agency’s compliance with a statute on behalf of its citizens in its parens patriae capacity. Id. at 
176. The D.C. Circuit held that Missouri “lack[ed] parens patriae standing to sue the federal gov-
ernment” and the court was “unpersuaded by [the] argument that Massachusetts v. EPA alters [this] 
longstanding” rule. Id. at 183. As the D.C. Circuit explained, “Massachusetts v. EPA is not a 
parens patriae case” because the state there established a direct injury as a landowner. Id. at 182. 
Plaintiffs’ reading of Massachusetts is also directly contrary to the manner in which the 
case has been interpreted and applied by numerous courts. See, e.g., Wyoming v. U.S. Dep’t of the 
Interior, 674 F.3d 1220, 1232 (10th Cir. 2012); Oklahoma ex rel. Pruitt v. Sebelius, No. 11-30, 
2013 WL 4052610, at *3–4 (E.D. Okla. Aug. 12, 2013); Florida ex rel. Cobb v. U.S. Dep’t of 
Justice, No. 5:10-cv-118, 2010 WL 3211992, at *1 (N.D. Fla. Aug. 12, 2010), affirmed by 440 
Fed. App’x. 860 (11th Cir. 2011). And even if the law did not prevent plaintiff states from bringing 
a parens patriae claim against the federal government, there is insufficient evidence in the record 
to support such a claim here (no evidence of any harm to any citizen). 
Second, Plaintiffs have a failure of proof when it comes to showing standing based on their 
own contracting with the Federal Government. To show standing (or irreparable injury), every 
plaintiff state must show “evidence in this case” that each is “very likely to bid” on contracts that 
contain the challenged clause. Adarand Constructors, Inc. v. Pena, 515 U.S. 200, 212 (1995). But 
Plaintiffs have not identified with the required specificity at this stage in the proceeding what con-
tracts each Plaintiff plans to bid on that will contain the challenged clauses.  
Some Plaintiffs provide no evidence at all, including Plaintiff states Arkansas, Montana, 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 22 of 27 PageID #: 917

17 
or South Dakota. The claims of those states must be denied and those plaintiffs dismissed because 
there is no evidence supporting any claim for standing. For others, the evidence submitted does 
not support standing. New Hampshire, for example, provides no evidence that any of their con-
tracts are higher than the $250,000 threshold required to be subject to the EO. See Pls.’ Mem., Ex. 
H, Decl. of Patrick Hackley, ECF No. 9-8 ($9,240/year); Pls.’ Mem., Ex. I, Decl. of David Scanlan, 
ECF No. 9-9 (all contracts fall under SAT Threshold); Pls.’ Reply, Ex. E, Decl. of Orville B. Fitch, 
ECF No. 23-5 (clarifying clause will not be added to certain contracts).  
Missouri likewise fails to identify a single contract that would give it standing. For exam-
ple, a declaration by Mr. Dru Buntin of Missouri Department of Natural Resources (DNR) attached 
to the reply clarifies that DNR’s agreements with GSA are “at or below the simplified acquisition 
threshold (SAT) or the simplified lease acquisition threshold (SLAT)” so “the proposed modifica-
tions are not mandatory.” Pls.’ Reply, Ex. D, Decl. of Dru Buntin, ¶ 4, ECF No. 23-4 (clarifying 
ECF No. 9-15). And while Mr. Buntin identifies other agreements, those agreements do not “meet 
the definition of a federal contract or contract-like instrument as those terms are defined in the 
Order,” so DNR is “consequently [not] subject to any federal vaccine mandate.” Id. ¶ 6. While 
Missouri identifies other existing contracts, ECF No. 9-14, there is no evidence about when those 
contracts expire, or if there are any options to renew. Nebraska’s declarations have the same defi-
ciencies. See Pls.’ Mem., Ex. M, Decl. of Jason Jackson, ECF No. 9-13. And there is no evidence 
in the record about Missouri or Nebraska’s plans on bidding on any specific contracts or whether 
those contracts would include the challenged clause. 
Other states describe bilateral agreements to add the clauses to existing contracts, but those 
modifications can only happen upon mutual assent of the parties—a decision that is beyond the 
scope of the Executive Order and thus breaks any chain of causation back to the EO. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 23 of 27 PageID #: 918

18 
North Dakota faces an additional hurdle because it identifies sub-contracts that have been 
impacted by provisions modified in the prime contract. See Armacast Decl. “[W]hen the plaintiff 
is not himself the object of the government action or inaction he challenges, standing is not pre-
cluded, but it is ordinarily substantially more difficult to establish.” Lujan v. Defs. of Wildlife, 504 
U.S. 555, 562 (1992). “The existence of one or more of the essential elements of standing depends 
on the unfettered choices made by independent actors not before the courts and whose exercise of 
broad and legitimate discretion the courts cannot presume either to control or to predict,” and it is 
“the burden of the plaintiff to adduce facts showing that those choices have been or will be made 
in such manner as to produce causation and permit redressability of injury.” Id. (citations omitted). 
EO 14,042 exempts existing contracts, so any addition of the COVID-19 safety clause in an exist-
ing contract happened because of a voluntary, bilateral modification between the government and 
a third party not before the court, or through some agency-specific authority that does not depend 
on the Executive Order. Either way, North Dakota fails to show causation or redressability.  
Iowa identifies a number of existing contracts that it voluntarily modified, but its choice to 
modify breaks the causal chain required to show standing. Pls.’ Mem., Ex. G, Decl. of Kraig 
Paulsen, ECF No. 9-7. While Iowa identifies an Iowa State University contract that was unilater-
ally modified, id. ¶ 6, that modification was done pursuant to agency-specific authority that did 
not depend on EO 14,042, so that likewise cannot confer standing.9 Iowa also fails to identify any 
                                              
9 In their opposition brief, Defendants acknowledged that the Iowa State contract with the 
Department of Energy (DOE) had been unilaterally modified. Defs.’ Opp’n at 37 n.6. While the 
EO does not require modifications to existing contracts or non-covered contracts, the EO “strongly 
encourage[s]” agencies, “to the extent permitted by law,” to ensure that all existing contracts and 
contract-like instruments also include the COVID-19 safety protocols. EO § 6(c). Modifications 
to existing contracts can be made by mutual agreement of the contracting parties. Agencies may 
also have independent contractual authority to unilaterally modify existing contracts. Such 
authority could include the ability to incorporate COVID safety protocols into existing contracts 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 24 of 27 PageID #: 919

19 
future contracting opportunities that will include the clause. Id. ¶ 7 (“It is unclear which, if any, of 
[Iowa] agencies may also be asked or forced to adopt the Contractor Vaccine Mandate.”). 
Wyoming appears to be the only state plaintiff with standing. See Pls.’ Mem., Ex. K, Decl. 
of Tara Evans ¶ 11, ECF No. 9-11 (identifying specific contracting opportunities over $250,000 
in December 2021 and May 2022). So any relief should be limited only to Wyoming. But even 
Wyoming is not entitled to a permanent injunction because it does not face irreparable harm—it 
may always seek compensation under the Contract Disputes Act. See Defs.’ Opp.’n at 37–38. 
Plaintiffs’ claim of “direct sovereign injuries,” Pls.’ Mem. in Support of Mot. for Prelim. 
Inj. at 37, ECF No. 9, likewise cannot create standing or irreparable injury. Defs.’ Opp’n at 38–
39; see Fla. v. HHS, 2021 WL 5768796, at *15 (rejecting similar argument, explaining that “it is 
black-letter law that the federal government does not invade areas of state sovereignty simply be-
cause it exercises its authority in a way that preempts conflicting state laws.” (cleaned up)). 
III. 
The equities and the public interest weigh against injunctive relief. 
The third and fourth requirements for issuance of an injunction—the balance of harms and 
whether the requested injunction will disserve the public interest—“merge when the Government 
is the opposing party.” Nken v. Holder, 556 U.S. 418, 435 (2009). Here, these factors tilt in the 
Defendants’ favor for all the reasons explained in Defendants’ brief. See Defs.’ Opp’n at 39–42. 
The only new argument raised in Plaintiff’s reply was that the government delayed implementing 
                                              
and contracts outside of the categories identified in the EO. To that end, DOE issued an 
agencywide order instructing Contracting Officers to use their authority to modify contracts where 
they already have the authority to do so. See DOE Order, available at https://perma.cc/3LWH-
CTTW; see also Defs.’ Opp’n, Ex. 2, Decl. of Cody Benjamin, ECF No. 20-2. 
Because standing is a jurisdictional issue that can be raised at any time and because 
Plaintiffs face a higher burden of proof to receive ultimate relief, Defendants now argue that Iowa 
has failed to demonstrate standing as well as irreparable harm, since it fails to show that DOE’s 
unilateral modification in accordance with preexisting, mutually agreed-upon contract clauses is 
“fairly traceable” to the Executive Order. Lujan, 504 U.S. at 560–61. 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 25 of 27 PageID #: 920

20 
the vaccine mandate until “nine months after the vaccines received emergency use approval.” Pls.’ 
Reply at 20. This ignores that the FDA approved the first full license for a COVID-19 vaccine on 
August 23, 2021, just two weeks before the President issued EO 14,042 on September 9. See FDA, 
“FDA Approves First COVID-19 Vaccine,” available at https://perma.cc/TNN7-QQD8. The gov-
ernment can hardly be faulted for waiting for full FDA approval of a vaccine before requiring 
contractors to vaccinate their workforces. Moreover, the clarifying declarations Plaintiffs submit-
ted with their reply, Buntin Decl. and Pls.’ Reply Ex. E, Decl. of Orville B. Fitch, ECF No. 23-5, 
show less impact on state agencies, tipping the balance even more decisively in Defendants’ favor.  
IV. 
In all events, any relief should be limited. 
Although relief is unjustified here, at a minimum, any such relief should be no broader than 
necessary to redress Plaintiffs’ alleged injuries. As the Supreme Court has explained, because this 
Court’s “constitutionally prescribed role is to vindicate the individual rights of the people appear-
ing before it,” any “remedy must be tailored to redress the plaintiffs’ particular injury.” Gill v. 
Whitford, 138 S. Ct. 1916, 1933–34 (2018); see also Madsen v. Women’s Health Ctr. Inc., 512 
U.S. 753, 765 (1994). Here, any relief should be limited to harmed contracts identified in Plaintiffs’ 
motion, or, at most, to contracts subject to EO 14,042’s mandate with the specific Plaintiff-states 
that demonstrated standing to bring suit (so here, that is only Wyoming). And any relief should 
block enforcement—but not inclusion—of a COVID-19 safety clause. See Defs.’ Opp’n at 42–43. 
In their reply, Plaintiffs do not dispute the scope of relief set forth in Defendants’ opposition. Nor 
can they: there is no basis for Plaintiffs to ask for more. 
CONCLUSION 
For these reasons, Plaintiffs’ request for relief under Rule 65(a)(2) should be denied. 
 
 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 26 of 27 PageID #: 921

21 
DATED: December 10, 2021  
 
Respectfully submitted, 
 
 
 
 
 
 
 
BRIAN M. BOYNTON 
 
 
 
 
 
 
Acting Assistant Attorney General 
 
 
 
 
 
 
 
BRAD P. ROSENBERG  
 
 
 
 
 
 
Assistant Director  
 
 
 
 
 
 
 
/s/ Vinita Andrapalliyal 
 
VINITA ANDRAPALLIYAL 
ZACHARY A. AVALLONE 
Trial Attorneys 
U.S. Department of Justice 
Civil Division, Federal Programs Branch 
1100 L Street NW 
Washington, D.C. 20005 
(202) 305-0845 
Vinita.b.andrapalliyal@usdoj.gov 
 
Counsel for Defendants 
Case: 4:21-cv-01300-DDN   Doc. #:  29   Filed: 12/10/21   Page: 27 of 27 PageID #: 922

File and source

File
Missouri_EDMO_4-21-cv-01300_8th-21-3725__doc-029__att-0.pdf
Size
369,006 bytes
SHA-256
8b6280e0efc359c24c623d997dd7b9fd68658c1af9b6654631df834c847cd98e
Our copy
Missouri_EDMO_4-21-cv-01300_8th-21-3725__doc-029__att-0.pdf
Original
storage.courtlistener.com
Back to top