Printed record of a hearing of the House Committee on Small Business, Subcommittee on Contracting and Infrastructure, held March 23, 2021, titled The Interaction Between the Paycheck Protection Program and Federal Acquisition Rules: What It Means for Government Contractors, Small Business Committee Document Number 117–007. Hon. Kweisi Mfume presided and the subcommittee met at 12:00 p.m. via Webex, with Hon. Maria Salazar giving the minority opening statement. Witnesses were Greg Bingham, partner at HKA; Susan Moser, partner at Cherry Bekaert; Robin Greenleaf, chief executive officer of Architectural Engineers, testifying for the American Council of Engineering Companies (ACEC); and Carlos A. Penin, president of CAP Engineering. The appendix adds material from the American Institute of Architects.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“The Interaction Between the Paycheck Protection Program and Federal Acquisition Rules: What It Means for Government Contractors (House Small Business subcommittee hearing, March 23, 2021).” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/the-interaction-between-the-paycheck-protection-program-and-federal-ac-4e458e0541/, SHA-256 4b80935be2b02fa554958c584900e43f72b6dd0aa0b992560b024dd44b0da567.

Full text

                                                              THE INTERACTION BETWEEN THE PAYCHECK
                                                                PROTECTION PROGRAM AND FEDERAL
                                                                ACQUISITION RULES: WHAT IT MEANS FOR
                                                                GOVERNMENT CONTRACTORS


                                                                                                  HEARING
                                                                                                         BEFORE THE


                                                               SUBCOMMITTEE ON CONTRACTING AND
                                                                       INFRASTRUCTURE
                                                                                                            OF THE


                                                                       COMMITTEE ON SMALL BUSINESS
                                                                              UNITED STATES
                                                                        HOUSE OF REPRESENTATIVES
                                                                             ONE HUNDRED SEVENTEENTH CONGRESS
                                                                                                       FIRST SESSION


                                                                                                       HEARING HELD
                                                                                                       MARCH 23, 2021




                                                                                Small Business Committee Document Number 117–007
                                                                                  Available via the GPO Website: www.govinfo.gov


                                                                                           U.S. GOVERNMENT PUBLISHING OFFICE
                                                                    43–803                             WASHINGTON : 2021




SBD026 with DISTILLER
                                                                                                                                                           Congress.#13
                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00001   Fmt 5011   Sfmt 5011   F:\DOCS\43803.TXT   DEBBIE
                                                                                    HOUSE COMMITTEE ON SMALL BUSINESS
                                                                                       NYDIA VELÁZQUEZ, New York, Chairwoman
                                                                                                JARED GOLDEN, Maine
                                                                                                JASON CROW, Colorado
                                                                                               SHARICE DAVIDS, Kansas
                                                                                              KWEISI MFUME, Maryland
                                                                                              DEAN PHILLIPS, Minnesota
                                                                                               MARIE NEWMAN, Illinois
                                                                                           CAROLYN BOURDEAUX, Georgia
                                                                                                 JUDY CHU, California
                                                                                            DWIGHT EVANS, Pennsylvania
                                                                                            ANTONIO DELGADO, New York
                                                                                          CHRISSY HOULAHAN, Pennsylvania
                                                                                                ANDY KIM, New Jersey
                                                                                               ANGIE CRAIG, Minnesota
                                                                                    BLAINE LUETKEMEYER, Missouri, Ranking Member
                                                                                               ROGER WILLIAMS, Texas
                                                                                              JIM HAGEDORN, Minnesota
                                                                                              PETE STAUBER, Minnesota
                                                                                              DAN MEUSER, Pennsylvania
                                                                                             CLAUDIA TENNEY, New York
                                                                                           ANDREW GARBARINO, New York
                                                                                                YOUNG KIM, California
                                                                                               BETH VAN DUYNE, Texas
                                                                                               BYRON DONALDS, Florida
                                                                                               MARIA SALAZAR, Florida
                                                                                            SCOTT FITZGERALD, Wisconsin

                                                                                          MELISSA JUNG, Majority Staff Director
                                                                                     ELLEN HARRINGTON, Majority Deputy Staff Director
                                                                                             DAVID PLANNING, Staff Director




                                                                                                                  (II)




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00002   Fmt 5904     Sfmt 5904   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              CONTENTS
                                                                                                           OPENING STATEMENTS
                                                                                                                                                                                             Page
                                                              Hon. Kweisi Mfume .................................................................................................              1
                                                              Hon. Maria Salazar .................................................................................................             2

                                                                                                                      WITNESSES
                                                              Mr. Greg Bingham, Partner, HKA, Washington, DC ...........................................                                       5
                                                              Ms. Susan Moser, Partner, Cherry Bekaert, Tysons, VA .....................................                                       7
                                                              Ms. Robin Greenleaf, PE, Chief Executive Officer, Architectural Engineers,
                                                               Boston, MA, testifying on behalf of the American Council of Engineering
                                                               Companies (ACEC) ..............................................................................................                 9
                                                              Mr. Carlos A. Penin, PE, President, CAP Engineering, Coral Gables, FL .........                                                 10

                                                                                                                       APPENDIX
                                                              Prepared Statements:
                                                                  Mr. Greg Bingham, Partner, HKA, Washington, DC ....................................                                         23
                                                                  Ms. Susan Moser, Partner, Cherry Bekaert, Tysons, VA ..............................                                         30
                                                                  Ms. Robin Greenleaf, PE, Chief Executive Officer, Architectural Engi-
                                                                    neers, Boston, MA, testifying on behalf of the American Council of
                                                                    Engineering Companies (ACEC) ..................................................................                           35
                                                                  Mr. Carlos A. Penin, PE, President, CAP Engineering, Coral Gables,
                                                                    FL ...................................................................................................................    40
                                                              Questions for the Record:
                                                                  None.
                                                              Answers for the Record:
                                                                  None.
                                                              Additional Material for the Record:
                                                                  AIA - American Institute of Architects ...........................................................                          41




                                                                                                                             (III)




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000      PO 00000       Frm 00003       Fmt 5904       Sfmt 0486      F:\DOCS\43803.TXT           DEBBIE
SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00004   Fmt 5904   Sfmt 0486   F:\DOCS\43803.TXT   DEBBIE
                                                              THE INTERACTION BETWEEN THE PAYCHECK
                                                               PROTECTION PROGRAM AND FEDERAL
                                                               ACQUISITION RULES: WHAT IT MEANS FOR
                                                               GOVERNMENT CONTRACTORS


                                                                                            TUESDAY, MARCH 23, 2021

                                                                                       HOUSE OF REPRESENTATIVES,
                                                                                    COMMITTEE ON SMALL BUSINESS,
                                                                SUBCOMMITTEE ON CONTRACTING AND INFRASTRUCTURE,
                                                                                                                  Washington, DC.
                                                                 The Subcommittee met, pursuant to call, at 12:00 p.m., via
                                                              Webex, Hon. Kweisi Mfume [chairman of the Subcommittee] pre-
                                                              siding.
                                                                 Present: Representatives Mfume, Golden, Newman, Salazar,
                                                              Stauber, Meuser, Fitzgerald, Andy Kim, Schneider, and Hagedorn
                                                                 Chairman MFUME. Ladies and gentlemen, good afternoon since
                                                              it is technically a few minutes after noon.
                                                                 I want to call this meeting to order officially and I want to make
                                                              some important announcements which also are requirements.
                                                                 Let me begin by saying that the standing House and Committee
                                                              rules and practices will continue to apply during these remote
                                                              hearings. All members are reminded that they are expected to ad-
                                                              here to these standing rules, including the rules that cover deco-
                                                              rum.
                                                                 House regulations, as most of you know, require members to be
                                                              visible through a video connection throughout the entire pro-
                                                              ceeding, so to the extent possible, please keep your cameras on.
                                                              Also, please remember to remain muted until you are recognized
                                                              in order to minimize background noise. If you have to participate
                                                              in another proceeding that might be going on simultaneously,
                                                              please exit this one and then log back in if you can later.
                                                                 In the event that a member encounters technical issues that pre-
                                                              vent them from being recognized for their questioning, I will move
                                                              to the next available member of the same party and I will recog-
                                                              nize that member at the next appropriate time if he or she is able
                                                              to correct the problem.
                                                                 Again, I know all of you have busy schedules. I appreciate every-
                                                              body taking time to be here. I am going to formally introduce our
                                                              witnesses in just a few moments but let me just underscore the fact
                                                              that this hearing on the Subcommittee on Contracting and Infra-
                                                              structure for the 117th Congress is our first. And for our opening
                                                              hearing I thought it was very important to examine an issue that
                                                              is a priority for government contractors and that is the interplay
                                                                                                                  (1)




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00005   Fmt 6633    Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  2

                                                              between the Federal Acquisition Regulation, also known as the
                                                              FAR, and the Paycheck Protection Program, also known as PPP.
                                                                 The FAR serves as a primary set of rules governing all executive
                                                              agencies and their acquisitions of goods and services. And so today
                                                              we will focus on part 31 of Far, which helps contractors determine
                                                              which costs are, in fact, reimbursable.
                                                                 Specifically, we will be taking a look at an aspect of the credit
                                                              cause, which can impact Federal contractors who have taken ad-
                                                              vantage of the Paycheck Protection Program. Congress created the
                                                              PPP to help, as we know, small businesses, meet payroll costs and
                                                              other expenses. These loans were designed to be fully forgivable if
                                                              small businesses spent loan proceeds on these purposes.
                                                                 However, Federal contractors, mainly those with false reimburs-
                                                              able contracts, may find themselves owing the government a credit
                                                              if the PPP loan has been forgiven and it was used to pay for costs
                                                              that were under a government contract.
                                                                 So this is by far some of the virtue of FAR credits and the motion
                                                              of the credit clause, which is included in these type of arrange-
                                                              ments and more specifically I should say, in these type of contracts.
                                                                 In April 2020, shortly after PPP’s launch, the Department of De-
                                                              fense issued guidance stating that the loan amounts could con-
                                                              stitute credits. In essence, the government’s position has been to
                                                              take a credit that is due to avoid duplication of payments. With
                                                              that said, some small contractors will argue that this is antithetical
                                                              to the PPP program’s intent which is to help struggling firms dur-
                                                              ing a time of crises.
                                                                 Contractors contend that if the government forces them to repay
                                                              portions of the loan through credits, then the PPP loan was not
                                                              truly forgivable.
                                                                 So today, we will have an opportunity to examine the varying po-
                                                              sitions on this critical issue, and during the hearing it will be very
                                                              important to note that the Defense Contract Audit Agency has
                                                              issued additional guidance on the treatments of credits. And while
                                                              there is certainly room for more guidance, this one represents, I
                                                              think, an important first step because it clarifies that when a con-
                                                              tractors receives PPP loan forgiveness, only the amount of the loan
                                                              forgiveness allocable to a government contract results in a credit.
                                                                 So moreover, it clarifies other matters that help ensure appro-
                                                              priate application of credits of which we will learn more about
                                                              today in the hearing that is now beginning.
                                                                 It is clear that this is a complex issue with significant ramifica-
                                                              tions for small government contractors. I hope that today’s hearing
                                                              will allow us to dive deep into the subject and to better understand
                                                              all sides of the issue, as well as available guidance that might come
                                                              to us or that might shed light on this subject just as the new guid-
                                                              ance did today.
                                                                 This hearing is an essential first step in coming to a resolution
                                                              that does not inflict further harm on the small businesses already
                                                              suffering from this pandemic across the country.
                                                                 So again, I want to thank the witness for joining us here today,
                                                              and now I would like to yield to the Ranking Member, Ms. Salazar
                                                              of Florida for her opening statement.
                                                                 Ms. SALAZAR. Thank you, Chairman.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00006   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  3

                                                                 It is undeniable that small business contractors play a critical
                                                              role in the Federal sphere. As you have said, these businesses are
                                                              innovators. They drive down the costs by promoting competition
                                                              and their flexibility allows them to be agile and adaptable, while
                                                              continuing to deliver excellent results often faster and cheaper
                                                              than their larger counterparts.
                                                                 That is why protecting these essential members of our workforce
                                                              is critical to maintain Federal operations at a best and optimal
                                                              level.
                                                                 But they are not immune, and they have not been immune to the
                                                              far-reaching effects of the COVID-19 pandemic. Indeed, small busi-
                                                              nesses everywhere, specifically in District 27, have suffered from
                                                              the governmental imposition of endless lockdowns and restrictions.
                                                              And many have suffered from cuts to billable hours, widespread
                                                              project cancellations, significant disruptions in cashflow, and inter-
                                                              ruptions in their ability to perform on the contract.
                                                                 I have spoken to many of my small business contractors in Dis-
                                                              trict 27 in South Florida that I represent in Congress, and many
                                                              of them have shared their concerns, including my constituent, Mr.
                                                              Carlos Penin, who is here with us today as a witness.
                                                                 Many small contractors have turned to their Paycheck Protection
                                                              Program (PPP), anticipating they may be able to receive loan for-
                                                              giveness provided they comply with the criteria that has been es-
                                                              tablished by the government.
                                                                 But apparently, the rules have changed. When the Department
                                                              of Defense (DOD) issued in April 2020 a memorandum applying
                                                              Federal Acquisition regulations cost principles to the PPP forgive-
                                                              ness, DoD had classified forgiveness of the PPP loan as a credit al-
                                                              lowed under contract. Now, the DoD has dictated that the con-
                                                              tractor must give this amount back to the government.
                                                                 According to the Department of Defense, this application of the
                                                              Federal Acquisition Regulation may be necessary to prevent
                                                              against potential abuse by contractors who are seeking a windfall
                                                              by billing the government twice. This activity is known as double
                                                              dipping, and we are here, elected in Congress, to prevent exactly
                                                              that and to help safeguard taxpayers’ money.
                                                                 However, the contracting community has raised several concerns
                                                              with the DoD’s strategy. Some contractors argue that the DoD’s
                                                              disposition contradicts congressional intent on the PPP. Others
                                                              have taken the view that this unfairly impacts certain contract
                                                              types triggering a requirement for payment of the PPP for some
                                                              contractors but not for others.
                                                                 So many take issue with the DoD’s change of rules expressing
                                                              their concerns and that they were surprised. This was a surprise
                                                              decision which was made unilaterally without their consent. Now
                                                              as we know, the deadline for forgiveness is around the corner and
                                                              they must decide what to do with their loan. For some, PPP may
                                                              be a welcome and necessary supplement to their existing cashflow,
                                                              but for others it may not be worth the trouble, particularly in light
                                                              of how application of the Federal Acquisition Regulation credit may
                                                              negatively affect future revenues.
                                                                 So I hope, and I am sure you do, Chairman, through the insight
                                                              of our distinguished panelists, we will be able to gain a better un-




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00007   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  4

                                                              derstanding of the DoD’s stated policy, its potential effects on small
                                                              contractors, and identify flexible solutions in a bipartisan fashion.
                                                                Thank you for your time, and I yield back, Chairman.
                                                                Chairman MFUME. Thank you very much. The Ranking Mem-
                                                              ber yields back. And I want to thank her for her comments and
                                                              thank again all of you who are here joining us.
                                                                By the way, if Committee members have an opening statement
                                                              prepared, we would ask that they be submitted for the record.
                                                                And while I am at it, I am going to ask unanimous consent that
                                                              every member has 5 legislative days to revise and extend their re-
                                                              marks.
                                                                I would like to just take a moment to explain how this remote
                                                              hearing will proceed. Each witness will have 5 minutes to provide
                                                              a statement and each Committee member will receive 5 minutes
                                                              for questions. Please ensure again that your microphone is on when
                                                              you begin speaking and that you return to mute when, in fact, you
                                                              are finished.
                                                                So I would now like to now introduce our witnesses. Our first
                                                              witness today is Greg Bingham, a partner at KHA and a co-lead
                                                              of their Government Contracts group. He is a forensic accounting
                                                              and quantum expert with over 33 years of experience in the field
                                                              of business consulting primarily for government and construction
                                                              contractors. Mr. Bingham is an authority on government contracts,
                                                              having served as an adjunct professor at the George Washington
                                                              University, and among his professional memberships, Mr. Bingham
                                                              is also a member of GW’s Government Contracts Advisory Board.
                                                              He holds a Bachelor of Science degree in Electrical Engineering
                                                              and an MBA degree as well. Welcome, Mr. Bingham.
                                                                Our second witness is Ms. Susan Moser. Moser. I am getting that
                                                              wrong but I will say Moser until I am corrected. And if I am wrong,
                                                              please forgive me. Ms. Moser is a partner at Cherry Bekaert and
                                                              the leader and founder of their Government Contracting Services
                                                              Group. Ms. Moser has 36 years of professional experiences and ad-
                                                              vises contractors in multiple areas. She also serves as a regional
                                                              market leader of the Cherry Bekaert’s Virginia, D.C., and Mary-
                                                              land practices, and is a board member of the Northern Virginia
                                                              Chamber of Commerce. She holds a Bachelor of Science degree in
                                                              Engineering—in accounting, excuse me—and is a certified public
                                                              accountant and a certified information technology professor. Thank
                                                              you very, very much, Ms. Moser. Again, forgive me if I am mispro-
                                                              nouncing your name.
                                                                Our third witness today is Ms. Robin Greenleaf. Ms. Greenleaf
                                                              has more than 30 years of professional experience and is the chief
                                                              executive officer and founder of the Architectural Engineers in Bos-
                                                              ton. She is a professional engineer and an LEED accredited profes-
                                                              sional. Ms. Greenleaf holds a Bachelor of Science in Civil Engineer-
                                                              ing and a Master of Science in Structural Engineering. She is the
                                                              Co-Chair elect of the American Council of Engineering Companies.
                                                              Welcome again, Ms. Greenleaf.
                                                                Our final witness before I yield back, and Mr. Penin. Please bear
                                                              with me because I am just making sure that I have a bio on you.
                                                              I did not see one here. Okay.
                                                                Ms. SALAZAR. Chairman, I have it here.
                                                                Chairman MFUME. I have it. Oh, no, I do not. You do have it?




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00008   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  5

                                                                Ms. SALAZAR. Yes. Yes, I do.
                                                                Chairman MFUME. Please, please, please introduce him, would
                                                              you?
                                                                Ms. SALAZAR. All right. Absolutely. Thank you. Thank you,
                                                              Chairman.
                                                                I would like to welcome our final witness who is from my district,
                                                              District 27 in Florida, Mr. Carlos Penin. Mr. Penin is the president
                                                              and founder of CAP Engineering. CAP is a minority-owned con-
                                                              sulting firm specializing in providing engineering services for gov-
                                                              ernment clients. Under his leadership, CAP Engineering has
                                                              earned a stellar reputation for the professional management of its
                                                              infrastructure projects and this has resulted in 30 years of depend-
                                                              able services to satisfy government clients. Mr. Penin has an exten-
                                                              sive resume with over 40 years of direct project experience and
                                                              managerial expertise. Among his many accomplishments, Mr.
                                                              Penin worked on several major architectural and engineering
                                                              projects in South Florida, including Joe Robbie Stadium, the wid-
                                                              ening of the Julia Tuttle Causeway and the reconstruction of SW
                                                              Eighth Street. Lastly, I would like to congratulate Mr. Penin on his
                                                              recent appointment by Florida Governor Ron DeSantis to the South
                                                              Florida Regional Transportation Authority Governing Board. I wish
                                                              you well in your new role, and thank you for all that you have
                                                              done, not only for our district, District 27, but for the United States
                                                              and for this magnificent country who opened its arms to you and
                                                              to your family when you were a little boy. Same case with me, and
                                                              that is why we are so grateful, and I am delighted to have you here
                                                              talking to us and explaining, and giving us your experience in this
                                                              last 40 years.
                                                                Now I yield back, Mr. Chairman. Thank you.
                                                                Chairman MFUME. Thank you, Ms. Salazar. Hopefully, we will
                                                              make a great one-two punch throughout the 117th Congress and I
                                                              appreciate you stepping up and doing what you could in terms of
                                                              properly introducing Mr. Penin. And Mr. Penin, thank you very
                                                              much, as with all the witnesses again for being here today.
                                                                Madam Salazar, I am going to move to start introducing or call-
                                                              ing for remarks of the witnesses unless you have a question or
                                                              comment or observation at this point.
                                                                Ms. SALAZAR. You can proceed with all the witnesses. Thank
                                                              you, Chairman.
                                                                Chairman MFUME. Thank you.
                                                                Mr. Bingham, you are now recognized for 5 minutes, sir.

                                                              STATEMENTS OF GREG BINGHAM, PARTNER, HKA; SUSAN
                                                               MOSER, PARTNER, CHERRY BEKAERT; ROBIN GREENLEAF,
                                                               PE, CHIEF EXECUTIVE OFFICER, ARCHITECTURAL ENGI-
                                                               NEERS; CARLOS A. PENIN, PE, PRESIDENT, CAP ENGINEER-
                                                               ING

                                                                                       STATEMENT OF GREG BINGHAM
                                                                 Mr. BINGHAM. Thank you. Thank you. This is quite an honor
                                                              to get to testify here today.
                                                                 As you mentioned, the FAR, the Federal Acquisition Regulation
                                                              is the primary set of rules used by the U.S. Government Executive




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00009   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  6

                                                              Branch agency. The FAR has 53 parts and FAR 31 is dedicated to
                                                              cost principles and procedures.
                                                                A key part of FAR 31 is what is the composition of total cost of
                                                              a contract and that is key to this credit issue. The cost of a contract
                                                              is the sum of allowable direct costs, allowable indirect costs, less
                                                              any allocable credit. And so there is more about this credit point
                                                              in the credit clause, which is at FAR 31.201-5. Examples of credits
                                                              are things like state tax refunds.
                                                                This credit clause is not new. It has been in the FAR since the
                                                              FAR began in 1984. It was in the Armed Services Procurement
                                                              Regulation as early as 1948 in essentially the same form as it is
                                                              today.
                                                                The impact of the FAR credits clause is different on cost reim-
                                                              bursement contracts than on fixed price contracts. If a contractor
                                                              incurs $1,000 in cost generally speaking on a cost reimbursement
                                                              contract, they will be reimbursed $1,000. Any event that reduces
                                                              the allowable cost incurred on a contract will reduce the amount
                                                              reimbursed under a typical cost reimbursement contract. And a
                                                              credit is an example of something that would reduce the cost on a
                                                              cost reimbursement contract.
                                                                The impact of the credit clause is different on fixed price con-
                                                              tracts. In fixed price contracts, the invoicing and payment provi-
                                                              sions generally focus on the contractor demonstrating they have
                                                              provided some specified product or service and requesting payment
                                                              of a predetermined price. And so if the contractor incurs more cost
                                                              or less cost, they still get that predetermined price on a fixed price
                                                              contract.
                                                                So a credit will reduce a particular contract’s cost and reduce the
                                                              amount paid on a cost reimbursement contract but not on a fixed
                                                              price contract.
                                                                As an example, let’s say Contractor A works solely with the Fed-
                                                              eral government and holds only fixed price contracts. Contractor A
                                                              has a PPP loan worth $1 million forgiven in 2020. There would be
                                                              no repayment to the government for any of the forgiven loan in this
                                                              example. Contractor B works solely with the Federal government
                                                              and holds only cost reimbursement contracts. Contractor B had a
                                                              PPP loan worth $1 million forgiven in 2020. Contractor B would
                                                              repay the government for this loan under this scenario.
                                                                There are different types of costs. The major categories of cost
                                                              are direct and indirect. And direct costs are for people that are ac-
                                                              tually working on contracts. Sometimes the labor of people working
                                                              on contracts is referred to as touch labor because the mechanic’s
                                                              hands are actually touching the car or on the assembly line people
                                                              are actually performing the work. Indirect costs are for costs that
                                                              are not working on the contractor and more for the growing con-
                                                              cern of the company. And so typical indirect costs are things like
                                                              facility rent or the salary and benefits of the office administrator
                                                              that works in the office and benefits all contracts, does not work
                                                              on any particular contract but on all contracts.
                                                                Indirect costs are often expressed in terms of an indirect cost
                                                              rate. So an indirect cost rate is the ratio of indirect costs to direct
                                                              costs. So remember numerator, denominator, top of the ratio, bot-
                                                              tom of the ratio. You have got indirect costs on top and the direct




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00010   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                   7

                                                              costs on the bottom in a typical example. And so it might be ex-
                                                              pressed as something like 5 percent.
                                                                 For years that have already passed, a company can determine all
                                                              of the direct costs and indirect costs that were incurred in this
                                                              prior year. And so in a typical process, after these costs are audited
                                                              by the government, the company and the government negotiate a
                                                              final settlement of what was the indirect cost rate for that prior
                                                              year. There are things called forward pricing rates. And so for
                                                              years that are not yet completed, as 2021 is now not completed,
                                                              and for years which have not yet commenced, government contrac-
                                                              tors often develop estimates of the total amount of indirect and di-
                                                              rect costs that will be incurred over the course of the year.
                                                                 It should not be assumed that future years will have exactly the
                                                              same indirect cost rate as a prior year. There can be nonrecurring
                                                              events and the forgiveness of a PPP loan in 2020 may well be a
                                                              nonrecurring event. Maybe an event that occurs in 2020 that you
                                                              do not anticipate will occur in future years. And if that is the case,
                                                              then the indirect rates for 2021 and future years should not be
                                                              based at all, solely or blindly on whatever the experience was in
                                                              2020.
                                                                 And with that I will——
                                                                 Chairman MFUME. You probably looked at the clock and started
                                                              wrapping up, but we have exhausted the amount of time for you.
                                                              If you would let us get through the others I am sure there are
                                                              going to be some questions directed your again. And again, I appre-
                                                              ciate your understanding.
                                                                 Mr. BINGHAM. Certainly. Certainly. Thank you for this oppor-
                                                              tunity.
                                                                 Chairman MFUME. Sure. Sure.
                                                                 The question is now for Ms. Moser. Ms. Moser, again, I know I
                                                              have said it several times, if I am mispronouncing your name,
                                                              please correct me because with a name like mine I cannot afford
                                                              to do that.
                                                                 Ms. MOSER. Thank you.
                                                                 Chairman MFUME. You are mute.
                                                                                           STATEMENT OF SUSAN MOSER
                                                                 Ms. MOSER. Thank you. Chairman Mfume, Ranking Member
                                                              Salazar, and members of the Committee, thank you for the oppor-
                                                              tunity to speak today.
                                                                 My name is Susan Moser and I would like to take this oppor-
                                                              tunity to talk about the government’s guidance on PPP forgiveness
                                                              and its impacts on contractors today and moving forward.
                                                                 As was previously mentioned, the interaction between the FAR
                                                              and PPP was first addressed in April 2020 when DoD answered a
                                                              frequently asked question and made clear that DoD expected PPP
                                                              loan forgiveness would result in a credit to the government on
                                                              flexibly priced contracts. Subsequent to this guidance, confusion
                                                              began as most companies have a mix of flexibly priced and firm-
                                                              fixed price contracts and many contractors plan to only seek for-
                                                              giveness of certain costs which could be a mix of direct and indirect
                                                              costs.
                                                                 While the impact of PPP forgiveness on flexibly priced contracts
                                                              has been made clear, the contractor community needs clarity




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000    Frm 00011   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  8

                                                              around how to handle forgiven costs under other contract arrange-
                                                              ments, including contracts with state transportation agencies. To
                                                              date, agencies have issued limited guidance with conflicting infor-
                                                              mation that contractors are struggling to understand and apply.
                                                              DCAA did issue guidance, revised guidance in January of 2021 that
                                                              confirmed that credits should be recorded based on how costs were
                                                              recorded when incurred. DCAA also stated that a PPP loan forgive-
                                                              ness credit should be allocated to the accounting period in which
                                                              it is received.
                                                                 The guidance is contrary to generally accepted accounting prin-
                                                              ciples and at least two decisions by the Court of Federal Claims
                                                              and its predecessor court. For most companies, forgiveness for costs
                                                              incurred in 2020 will occur in 2021.
                                                                 I would also like to note that the impact of the Employee Reten-
                                                              tion Credit creates the same challenges for contractors. Much of the
                                                              concern regarding guidance has come from architecture and engi-
                                                              neering or A&E firms doing business with state transportation
                                                              agencies who receive funding from the Federal Highway Adminis-
                                                              tration. These contracts carry many FAR requirements. There is
                                                              concern with potential draft guidance being considered by the
                                                              Highway Administration that would require all PPP forgiveness
                                                              credits to be applied to indirect costs. Accounting for credits in this
                                                              way is inconsistent with FAR Part 31 and would result in reduced
                                                              indirect cost rates for the year in which the credit is applied, but
                                                              could also apply throughout the life of multiple year contracts
                                                              awarded in the year in which the reduced rates were established,
                                                              potentially resulting in reduced indirect rates for multiple years.
                                                                 Understandably, many A&E firms are concerned with the impli-
                                                              cations of this anticipated guidance. Most states’ Department of
                                                              Transportation agencies require A&E firms to have an indirect rate
                                                              audit conducted by a CPA firm. Our firm performs many of these
                                                              types of audits.
                                                                 State DOTs are trying to get guidance from the Federal Highway
                                                              Administration, but absent that are advising to rely on existing
                                                              regulations in determining credits.
                                                                 There are three areas where guidance could assist contractors.
                                                              First, standardizing the period in which the PPP credit should be
                                                              reported and included in any indirect rate audit. The credit should
                                                              be included in the same year costs were incurred.
                                                                 Second, I recommend that any contractors that are receiving PPP
                                                              funds disclose in the notes to their indirect rate audit the cal-
                                                              culated rate both with and without forgiveness considered.
                                                                 Lastly, inform procurement agencies, particularly transportation,
                                                              the rates included in indirect rate audits should be used in negotia-
                                                              tions, but that final prices can and should incorporate consider-
                                                              ation of the impact of PPP forgiveness. Specifically, while the rate
                                                              including PPP forgiveness can be used in year one of a multiple
                                                              year contract, subsequent years should be renegotiated using rates
                                                              that are not impacted by the PPP credit. Contracting agencies
                                                              should also incorporate business judgment in negotiating a price
                                                              that is fair and reasonable to both parties.
                                                                 These recommendations, I believe, align with generally accepted
                                                              accounting principles, the FAR Cost Principles and would help al-
                                                              leviate negative financial impacts in subsequent years. Further,




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00012   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                                  9

                                                              this would reduce confusion while also ensuring contractors receive
                                                              the benefit originally intended by the CARES Act but without the
                                                              potential to ‘‘double dip’’ and allow some contractors to receive a
                                                              greater benefit than companies who do not contract with the gov-
                                                              ernment.
                                                                Thank you very much for your time today.
                                                                Ms. SALAZAR. Mr. Mfume, you are muted.
                                                                Chairman MFUME. I was thanking all the witnesses for their
                                                              testimony so far and reminding people that we all have their writ-
                                                              ten testimony. If they have it nearby I would urge that you hold
                                                              on to it because there may be some questions, comments and obser-
                                                              vations that go directly back to that.
                                                                I would like to recognize Ms. Greenleaf at the current moment.
                                                              Ms. Greenleaf, you have 5 minutes. The floor is yours.
                                                                                    STATEMENT OF ROBIN GREENLEAF
                                                                 Ms. GREENLEAF. Thank you very much, Chairman Mfume, and
                                                              Ranking Member Salazar. Thank you for the opportunity to testify
                                                              before the Subcommittee today.
                                                                 My name is Robin Greenleaf. I am the CEO of Architectural En-
                                                              gineers, Inc., a woman-owned engineering firm in Boston. We have
                                                              33 employees who provide mechanical and electrical engineering
                                                              services to Federal, state, and local agencies and private companies
                                                              and owners. I am also the Chair-elect of the American Council of
                                                              Engineering Companies and I have the privilege of serving as Na-
                                                              tional Chair starting in April. It is an honor to represent my col-
                                                              leagues here today.
                                                                 I cannot overstate how important this issue is to small business
                                                              engineering firms across the country right now. My 2020 experi-
                                                              ence is typical of hundreds and hundreds of my colleagues in the
                                                              industry. We relied on the PPP loan to keep our entire staff on the
                                                              payroll even in the face of significant business disruptions and rev-
                                                              enue loss. And the program was successful. It met its intended ob-
                                                              jective.
                                                                 But now those of us who contract for government clients are fac-
                                                              ing the imposition of a credit under the FAR and we think this is
                                                              completely misguided. Congress already made clear that forgiven
                                                              PPP loans are not to be treated as income for tax purposes and
                                                              then further clarified that covered expenses are deductible. In the
                                                              same way, forgiven PPP loans ought not to count as income under
                                                              the FAR. This was emergency relief to support employers and busi-
                                                              nesses ought to be able to take full advantage of the program.
                                                                 There are numerous challenges with this policy that I want to
                                                              highlight for you. One, if this credit is applied to reduce our over-
                                                              head rate as opposed by the Federal Highway Administration, we
                                                              are going to be working at a discounted rate, not only in the com-
                                                              ing year but potentially for several years. Many of our clients lock
                                                              in the indirect cost rate over the life of a multi-year contract. On
                                                              my $594,000 PPP loan on which we just received forgiveness last
                                                              week, I am looking at 32 percent drop in my overheard rate result-
                                                              ing in the loss of at least $129,000 per year. Only about 15 percent
                                                              of my firm’s work is with public agencies using our FAR rate. For
                                                              firms that do predominately DOT work, it is easy to see how the
                                                              losses will far exceed the value of the loan.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00013   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              10

                                                                 This leads to my second point. The impact of the credit will fall
                                                              most heavily on small, minority-owned, and women-owned firms
                                                              that needed the assistance the most and have come to perform a
                                                              higher percentage of government contracting.
                                                                 I have documented a few examples in my written testimony and
                                                              I hear from more colleagues every day. And so the basic outcome
                                                              of this policy is that our state and local clients will be benefitting
                                                              from the PPP, not us. We are passing the loan through to them
                                                              through discounted billing rates. If unchanged, he application of
                                                              this credit will create a disincentive for women-owned firms, minor-
                                                              ity-owned firms, DBEs, and other small businesses to compete for
                                                              work for public agencies. It will derive the government of qualified
                                                              engineering services and will hamper efforts to expand small busi-
                                                              ness and DBE contracting opportunities.
                                                                 Let me also say that the inequity here with our counterparts in
                                                              the infrastructure market is frustrating. Other contractors working
                                                              on Federal aid projects are not subject to these same requirements.
                                                              Fixed price contracts are not impacted by the FAR credits clause.
                                                              While my rates are reduced, other businesses working on the same
                                                              infrastructure projects have been able to retain the full benefit of
                                                              the PPP. This uneven treatment does not seem fair or equitable.
                                                                 There is a real sense of urgency in the industry to get this issue
                                                              resolved. Firms that already received forgiveness are starting the
                                                              annual audit process and seeing the impact of the credit on their
                                                              rates. Some business owners are already questioning whether they
                                                              can continue to keep all their employees that they supported with
                                                              the PPP loan. Those that have not yet applied for forgiveness are
                                                              coming up on the 10 month deadline to start repaying those loans.
                                                              Banks are pressuring them to decide whether to apply for forgive-
                                                              ness. Our small business owners need to make critical business de-
                                                              cisions about the impact on their rates and projected revenues and
                                                              employment ramifications.
                                                                 At a time when the industry is very eager to work with your col-
                                                              leagues to deliver a robust infrastructure-based economic recovery
                                                              agenda, your prospects for these opportunities are dimmer because
                                                              of this credit holding us back.
                                                                 Thank you for the opportunity to testify.
                                                                 Chairman MFUME. Thank you very much, Ms. Greenleaf.
                                                                 Mr. Penin, you are now recognized for 5 minutes.

                                                                                     STATEMENT OF CARLOS A. PENIN
                                                                 Mr. PENIN. Good afternoon, Chairman, Ranking Member Sala-
                                                              zar, all congressional members of the Subcommittee on Contracting
                                                              and Infrastructure and everyone present.
                                                                 My name is Carlos Penin. I arrived from Cuba in 1962 at the age
                                                              of six. I think I am giving away my age. I am a proud Cuban Amer-
                                                              ican who pursued a career in engineering and ended up fulfilling
                                                              my American dream of starting my own business. The company
                                                              that I started, CAP Engineering is a small, minority-owned busi-
                                                              ness that has been in operation in the city of Coral Gables, District
                                                              27, for almost 33 years. Today, I am addressing this Committee as
                                                              the founder and president of my company representing my employ-
                                                              ees, but also as a former president of ACEC Florida, the organiza-




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00014   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              11

                                                              tion that represents member engineering firms in the state of Flor-
                                                              ida.
                                                                 In Florida, we have hurricanes, and I have survived multiple
                                                              hurricanes during our company’s history, sometimes multiple hur-
                                                              ricanes in the same years. The devastation from this pandemic has
                                                              been far worse and nobody could have even predicted it, nobody
                                                              saw it coming, and the severe impact that it has had.
                                                                 In the early months of the pandemic, we applied for and received
                                                              assistance from the PPP. The assistance that we received was ap-
                                                              plied as intended to help keep our loyal staff employed so that
                                                              they, in turn, could keep their families fed, safe, and healthy.
                                                                 The interpretation of the Federal Acquisition Regulation, the
                                                              FAR clause, would reverse the benefits received from the PPP and
                                                              could have a negative impact for our company and any company
                                                              that pursues Federal or state contracting for years to come.
                                                                 As Robin so well pointed out, if the PPP loan forgiveness is
                                                              unallowed and therefore subtracted from the indirect labor cost,
                                                              then in our case our overheard rate would be reduced by approxi-
                                                              mately 25 percent. If we had multiple year contracts, the lower
                                                              overhead rate would be applied for multiple years and for multiple
                                                              contracts. This reduction would be higher than the original loan
                                                              amount that we received, thus negating the original intent of the
                                                              PPP loan which was to help companies such as ours keep our em-
                                                              ployees and thus help our families.
                                                                 I ask you to please consider our industry’s request that this unin-
                                                              tended consequence be eliminated. And as good engineers, we are
                                                              supposed to finish on time and under budget and I yield back with
                                                              2 minutes and some seconds left over in my presentation. Thank
                                                              you very much.
                                                                 Chairman MFUME. Thank you, and my thanks to all of the wit-
                                                              nesses.
                                                                 We are going to begin the open session of questions and com-
                                                              ments with members who are present today. And I would like to
                                                              recognize myself for 5 minutes.
                                                                 Mr. Bingham, could you go back and elaborate on what the credit
                                                              clause is and how it is supposed to work and how a Federal con-
                                                              tractor is bound by the principle clause?
                                                                 Mr. BINGHAM. Certainly. A key issue for reimbursement of cost
                                                              and just cost accounting generally is what is the cost recorded on
                                                              a contract. And the cost recorded on a contract is direct cost plus
                                                              indirect cost and less any credit. So the issues that are being dis-
                                                              cussed here relate—when people talk about paying their employ-
                                                              ees, that may well be a direct cost. It is hard to know if there are
                                                              indirect employees but it could well be direct cost of performance.
                                                              If they talk about paying for facilities cost or their indirect per-
                                                              sonnel, then that would be, you know, part of their indirect cost.
                                                              But the credits, wherever the credits, wherever the loan money is
                                                              spent, that is where the credit should go. If a company uses the
                                                              loan for a particular contract, only to reimburse employees on a
                                                              particular cost, then the credit should go to that particular con-
                                                              tract, not other contracts, not on overhead. If the credit went all
                                                              to facility cost and overhead, then the forgiveness should go only
                                                              to overhead.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00015   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              12

                                                                I hope that helps you understand that in determining the cost on
                                                              a contract, the credit has to be reduced from wherever the loan was
                                                              spent. That is where the reduction occurs.
                                                                Chairman MFUME. Okay. And Ms. Moser, I am just going to
                                                              stay on the matter regarding these credits. You mentioned in your
                                                              testimony that DCAA issued guidance on how the credits should,
                                                              in fact, be applied. Could you take a moment and expand on the
                                                              major points of that guidance and how it really works in practice?
                                                                Ms. MOSER. Yes. I would be happy to.
                                                                So DCAA issued its guidance in January which had a number of
                                                              different areas that they addressed. The first area is they were
                                                              clear, and this is consistent with the earlier DoD guidance and con-
                                                              sistent with the testimony we just heard, that loan forgiveness pro-
                                                              ceeds should be applied in the same manner in which the original
                                                              cost was occurred. So just as we heard before, if direct salaries
                                                              were used and it could be for commercial work or on direct cost re-
                                                              imbursable work, that portion of the credit should go back to that
                                                              where it was originally incurred. If it was included in the overhead,
                                                              that is where it should be incurred. So that was pretty straight-
                                                              forward and I think consistent with FAR.
                                                                DCAA’s guidance suggested or stated that—and DCAA, when
                                                              they issue guidance, they are actually issuing guidance to their
                                                              auditors. The general public and contractors certainly use that as
                                                              a reference but they are issuing guidance to their auditors. But
                                                              they also stated that when the credit is received is the year in
                                                              which it should be applied. So that creates some inconsistency as
                                                              companies have incurred the loan forgiveness of PPP during 2020
                                                              and they are going to get proceeds or forgiveness in 2021. That
                                                              matching, that inconsistent matching, I believe is not correct.
                                                                They also did address a number of other areas in their guidance
                                                              including guidance on contractors doing forward pricing. So a for-
                                                              ward pricing rate agreement is a forward looking forecast of rates
                                                              that is used for certain types of contracts. It is typically used in ne-
                                                              gotiating fixed price task orders or change orders. So they did in-
                                                              clude in their guidance that consideration should be given to—2020
                                                              we have all acknowledged was an unusual year with unusual cir-
                                                              cumstances. And costs incurred and credits incurred in this year
                                                              should be considered in looking at forward looking. Just because
                                                              historical reference is not necessarily the prediction of what the fu-
                                                              ture rates would be. So those were the specific areas they ad-
                                                              dressed.
                                                                Chairman MFUME. Thank you very much, Ms. Moser.
                                                                My time has expired. The Chair will recognize the Ranking
                                                              Member, Ms. Salazar.
                                                                Ms. SALAZAR. Thank you, Chairman.
                                                                I think I want to use my 5 minutes. Maybe I can ask the same
                                                              question to the different witnesses. And I would start with Mr.
                                                              Penin and then I can ask Ms. Moser.
                                                                I think that the main concern the government has is to avoid the
                                                              double dipping. So if you were in our position, what would be your
                                                              recommendation? I am sure Mr. Penin, Ms. Moser, I am sure that
                                                              all of you do not want that happening. We do not want to have to
                                                              pay twice. So in which way could we be able to be fair to you but
                                                              at the same time not pay you double?




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00016   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              13

                                                                 We will start with you, Mr. Penin.
                                                                 Mr. PENIN. Thank you very much for the question, Ranking
                                                              Member Salazar.
                                                                 That is more of an accounting function. I do not think that it is
                                                              double dipping. We used the loan for what it was intended to be
                                                              used, which was to save our employees, and we did that. When we
                                                              sought the PPP funding, we looked at it as the lifeline to get to the
                                                              other side of the pandemic and that, as we have heard oftentimes,
                                                              that goalpost kept moving on us over and over again. So it was a
                                                              vital opportunity for us to be able to stay alive, stay afloat during
                                                              this last year.
                                                                 As far as the FAR and how that is used, as I mentioned in my
                                                              testimony before, that has a negative impact on the bottom line be-
                                                              cause what happens is it gets applied to the indirect labor cost, and
                                                              therefore, it pushes our multiplier down. And in some cases as we
                                                              will experience in my company, it will put us at 25 percent below
                                                              what we are currently doing today.
                                                                 So we see this as a loan, a forgivable loan that has carried us
                                                              through last year. It is not reoccurring but the unintended con-
                                                              sequence could reoccur for multiple years to come. I hope that an-
                                                              swers your question.
                                                                 Ms. SALAZAR. Sure. Yes. Thank you.
                                                                 Why do we not then ask Ms. Moser? Ms. Moser?
                                                                 Ms. MOSER. Yes. So the FAR incorporates the cost principles
                                                              into certain types of contracts. So specifically, the flexibly priced
                                                              contracts, cost-type contracts, time and materials contracts. And I
                                                              do not think waving the credits clause cart blanche related to PPP
                                                              is the appropriate thing to do because it could lead to unintended
                                                              consequences and it could provide a situation where contractors
                                                              that have only flexibly-priced contracts would double dip. Basically,
                                                              they are billing the government for all of their costs incurred and
                                                              then they are getting the forgiveness. And so I do not think people
                                                              want that to happen, certainly not as a tax payer. I think the chal-
                                                              lenge is that the cost principles are referenced in many other types
                                                              of contracts and a lot of what we are hearing is regarding state
                                                              transportation contracts. And so my recommendation is not a waiv-
                                                              er of the FAR credits clause; it is really about issuing better guid-
                                                              ance and explaining the situation so that contractors negotiating
                                                              with state transportation agencies, for example, have all of the in-
                                                              formation about the impacts that, you know, the rate needs to be
                                                              calculated as the rate is consistent with the FAR, but how that rate
                                                              is utilized in subsequent years I think is really where the guidance
                                                              is needed. So, you know, the timing of the guidance from DCAA I
                                                              think is a problem and then I think the lack of guidance or con-
                                                              cerns about proposed guidance that might be issued from the High-
                                                              way Administration—that is really where I think the focus is.
                                                                 When guidance is issued by audit agencies, they do not seek pub-
                                                              lic comments. And with lots of proposed regulations, there is public
                                                              comment and an opportunity for people to weigh in. And I think,
                                                              you know, that certainly could be helpful to this process to improve
                                                              upon.
                                                                 Ms. SALAZAR. So it is not necessarily an accounting issue ac-
                                                              cording to what you are saying but it is just clarification?




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00017   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              14

                                                                 Ms. MOSER. So I think the accounting in terms of how the cred-
                                                              its clause should be applied is clear and does not require a change.
                                                              I think it is the application of how those rates are utilized in subse-
                                                              quent years’ contracts.
                                                                 Ms. SALAZAR. Thank you. I yield back.
                                                                 Chairman MFUME. Thank you, Ranking Member.
                                                                 The Chair would like to recognize Representative Golden from
                                                              the state of Maine. Mr. Golden?
                                                                 Mr. GOLDEN. Thank you, Mr. Chair.
                                                                 I think I will start with Ms. Moser. And I wanted to ask if there
                                                              are other examples out there in addition to the PPP program where
                                                              we have COVID-related Federal assistance for which a contractor
                                                              might have to provide the government with a credit. And if the an-
                                                              swer is yes, could you also elaborate a little bit about why?
                                                                 Ms. MOSER. Yes. I would be happy to.
                                                                 I think the most immediate additional assistance is the employee
                                                              retention credit. So when the employee retention credit was first
                                                              incorporated into the CARES Act, companies that received PPP
                                                              loans were not eligible for the employee retention credit. So for
                                                              most contractors, you know, PPP was that lifeline, that immediate
                                                              assistance that they were seeking so they really didn’t focus on the
                                                              employee retention credit. With the legislation that passed in De-
                                                              cember, that made available the employee retention credits for
                                                              companies that also received PPP loans.
                                                                 The employee retention credit is a credit against payroll taxes.
                                                              So it is consistent with the credits clause—so a company that is a
                                                              contractor that has flexibly priced contracts, cost contracts. If they
                                                              are eligible to receive an employee retention credit, it is a reduction
                                                              against the payroll taxes that they pay. So it would be treated con-
                                                              sistently if they originally recorded the payroll taxes say in 2020
                                                              when they paid them, it would go to a fringe. Usually that is an
                                                              indirect expense considered a fringe benefit. When you receive the
                                                              credit, it should be applied back the same in a similar manner. So
                                                              it is a very similar situation.
                                                                 Mr. GOLDEN. Thank you. I think that is helpful.
                                                                 Ms. Greenleaf, you testified that engineering firms particularly
                                                              have difficulty compared to other contractors that also do business
                                                              with state departments of transportation. And I wanted to ask you
                                                              if you could elaborate a little bit further on that. And secondly, I
                                                              wanted to ask if you felt that should Congress mandate DOT to
                                                              issue guidance that would ensure that indirect cost rates were
                                                              trued up based on what a firm’s real indirect costs were for the
                                                              year impacted by the credit, would that address ACEC’s concerns?
                                                                 Ms. GREENLEAF. To answer your first question, I think that
                                                              the engineering firms in general, many of us work for state DOTs.
                                                              And so the guidance, the draft guidance that has come out from
                                                              Federal Highway at this point is taking a very hardcore approach
                                                              to how to deal with the PPP credit. So it is one reason why we
                                                              were pushing back so hard on this issue.
                                                                 We are part of a very narrow band of impacted professionals that
                                                              are feeling the pressure from the FAR credit clause. It does not ex-
                                                              tend far beyond just those of us who work for state DOTs. And so
                                                              based on that, that is why we are wanting to just see the loan be
                                                              completely forgiven and not have to apply the credit.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00018   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              15

                                                                 So having said that, I am going to need to ask you to repeat your
                                                              second part of your question and then I will come right back to you.
                                                                 Mr. GOLDEN. Yes. If Congress were to mandate that the Fed-
                                                              eral Department of Transportation issue guidance that would en-
                                                              sure that indirect cost rates were more accurately reflecting a
                                                              firm’s real indirect costs for the year impacted by the credit, would
                                                              that in any way address the concerns of your organization?
                                                                 Ms. GREENLEAF. I do not know that it does. The reason for
                                                              that is that the state DOTs, and that is largely who we are talking
                                                              about, are inconsistent across the country in their ability to do the
                                                              truing up on an annual basis. And I can tell you from personal ex-
                                                              perience in Massachusetts that the work that I do here, we are put
                                                              in what is the equivalent of multi-year contracts. The overhead
                                                              rate does not change. It is very difficult to get an audit to request
                                                              the change. And I think that based on that what we could expect
                                                              is just a lot of inconsistency across the DOT’s abilities to do the
                                                              truing up and to do annual audits.
                                                                 Mr. GOLDEN. That is very helpful.
                                                                 I see I only have 10 seconds left so I will yield back the 8 sec-
                                                              onds.
                                                                 Chairman MFUME. Thank you very much, Representative Gold-
                                                              en.
                                                                 The Chair would now recognize Mr. Stauber. Did we lose him?
                                                              Okay, maybe he will jump back in. Okay, Mr. Stauber is out.
                                                                 Ms. Salazar, I do not see any other members from your side of
                                                              the aisle. Am I missing someone?
                                                                 Ms. SALAZAR. Yeah, they had other Committee meetings going
                                                              on at the same time. And myself, I have to go to Foreign Relations.
                                                              But I am staying here with you until you have finished with all the
                                                              testimonies.
                                                                 Chairman MFUME. Thank you. Mr. Fitzgerald is here though,
                                                              and I would like to recognize Mr. Fitzgerald for 5 minutes. Thank
                                                              you, sir.
                                                                 Mr. FITZGERALD. Thank you. Thank you. Just real quick to
                                                              Mr. Carlos Penin.
                                                                 I understand today we are kind of focused on the PPP stuff, but
                                                              in the COVID bill that recently passed it did include some lan-
                                                              guage on section 36.10 that authorizes agencies to address con-
                                                              tractor employee salaries. I was wondering if you had any com-
                                                              ments on that. You know, it is kind of related to catastrophic
                                                              events and what my understanding is. I do not know more than
                                                              that about it. But I just wonder if you could provide any insight
                                                              into the impact that that may have.
                                                                 Mr. PENIN. Thank you for the question, Congressman Fitz-
                                                              gerald. I am not familiar with the new legislation and I am not
                                                              going to be helpful to you on that. I have not read it.
                                                                 Mr. FITZGERALD. Very good. Yeah, it is kind of a struggle and
                                                              I think a lot of us have been caught off guard because of the legis-
                                                              lation just signed into law. But I would urge the Chair and the
                                                              Ranking Member, I think it is something that we need to probably
                                                              take a look at and hopefully, because it seems to be boiling up right
                                                              now. So thank you, and I will yield back. Thank you.
                                                                 Ms. SALAZAR. Chairman?
                                                                 Chairman MFUME. Yes.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00019   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              16

                                                                 Ms. SALAZAR. I think we do have Congressman Meuser with us.
                                                              Is that correct? So we can recognize him?
                                                                 Chairman MFUME. I see him. Yes. Yes.
                                                                 We will first recognize Ms. Newman for her 5 minutes and then
                                                              we will come back to Representative Meuser.
                                                                 Ms. Newman?
                                                                 Ms. NEWMAN. Thank you, Chairman. And thank you, Ranking
                                                              Member Salazar.
                                                                 This is a very timely issue in my district. Dozens of small busi-
                                                              nesses have come forward to talk about this with us, so I am so
                                                              glad for the testimony today. And thank you to all the witnesses.
                                                              It has been very helpful to dimensionalize this for me.
                                                                 I have a couple of questions and I think I would like Ms. Moser
                                                              and Mr. Penin to answer them. And I will go to Mr. Penin first.
                                                                 So it clearly seems like there is an issue here that can be ad-
                                                              dressed, and I do not think it has to be brain surgery. What is your
                                                              recommendation? Does it need to be a clarification of rules? Is it
                                                              regulatory? Or do you think it requires congressional intervention?
                                                              And I will go to Mr. Penin first.
                                                                 Mr. PENIN. Thank you very much, Congresswoman Newman.
                                                              And thank you for your concerns for your district as well. I think
                                                              that for us it is probably a clarification of the language and how
                                                              it is being applied more so than an act of Congress. I am trying
                                                              to keep it simplified because, you know, if you started getting too
                                                              many people involved, you know, it starts to muddle the situation.
                                                              But I would think that it is something that can be handled as long
                                                              as there is a clarification of the interpretation. And I think that
                                                              that would be the easiest way of handling it. And it certainly would
                                                              serve our purpose on the industry side to have that resolved.
                                                                 I hope that answered your question.
                                                                 Ms. NEWMAN. Yes. Yes. And then I need to go to Ms. Moser.
                                                              From a technical standpoint, or from an accounting perspective,
                                                              what would your remedy be?
                                                                 Ms. MOSER. Yes, thank you.
                                                                 So I agree with Mr. Penin. I do not believe that there is legisla-
                                                              tive action that is needed to rectify this situation. I think that
                                                              could end up with unintended consequences. I really think it is an
                                                              issue of clarification on guidance.
                                                                 The DCAA, as I mentioned, their guidance is issued to auditors.
                                                              So, while I disagree and I think it is an incorrect guidance on the
                                                              timing of the application, ultimately contracting officers make
                                                              those recommendations. The DCAA is making recommendations to
                                                              its auditors; contractors if they do not agree with that, ultimately,
                                                              it is up to the contracting officer to make a decision on that.
                                                                 I think the biggest issue, and I think what we have really heard
                                                              here today is really related to Federal Highway Administration and
                                                              that guidance because that does flow down to, as you heard, the
                                                              state agencies. And I think that is really where the majority of the
                                                              angst and the concern is that without additional guidance and rec-
                                                              ommendations to state agencies there is going to be unintended
                                                              consequences longer term than just this year.
                                                                 Ms. NEWMAN. So just to clarify that, Ms. Moser, you are saying
                                                              that the clarification should be some recommendation from Con-




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00020   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              17

                                                              gress with regard to the PPP program but then also instruct the
                                                              state and local agencies as such as well, both steps?
                                                                 Ms. MOSER. Well, I do not think necessarily that Congress has,
                                                              other than trying to get the agencies to issue the guidance, I think
                                                              that is really what is needed. And then really it is the guidance
                                                              that they issue because all of the state agencies are looking to Fed-
                                                              eral Highway Administration for guidance. So I think really the
                                                              guidance is needed with clarity from the Highway Administration.
                                                                 Ms. NEWMAN. Thank you for clarifying that.
                                                                 I yield back. Thank you, Chairman.
                                                                 Chairman MFUME. Thank you very much.
                                                                 I would like to at this time recognize the gentleman from Penn-
                                                              sylvania, Mr. Meuser.
                                                                 Mr. MEUSER. Thanks, Mr. Chairman. Thank you all to the tes-
                                                              tifiers. Appreciate it. It is an important subject, clearly. Very finan-
                                                              cially important situation that needs clarification. No question.
                                                                 So I ask, and I will start with Ms. Moser and I will also ask oth-
                                                              ers as well, what was understood by you at the time that you sub-
                                                              mitted for what was described as a forgivable business loan? Was
                                                              it understood that this was to be completely forgivable under the
                                                              conditions of retaining your employees?
                                                                 Ms. MOSER. Hi, since you asked me to address first, so I am an
                                                              advisor. I am a partner in an accounting firm and so I advise cli-
                                                              ents, so I was not applying for a PPP loan. You know, I think like
                                                              just with most of our clients at the time, you know, it was a life-
                                                              line, and so I think most companies, you know, had no idea what
                                                              was going to happen and so did apply. That was generally our rec-
                                                              ommendation.
                                                                 Mr. MEUSER. Right.
                                                                 Ms. MOSER. Obviously, there has been much guidance since
                                                              then but I think that the forgiveness issue is really for contractors.
                                                              There has been much analysis and angst, frankly, on whether they
                                                              should or should not apply for forgiveness, again, depending on
                                                              really their contract nicks in terms of how that is going to——
                                                                 Mr. MEUSER. So you advise that, yes, they should take loans
                                                              under the understanding of the requirements for PPP and there-
                                                              fore, it would be forgivable if they met those requirements?
                                                                 Ms. MOSER. Yes, generally if they met the requirements. Yes.
                                                                 Mr. MEUSER. Mr. Penin, is that what you understood from the
                                                              original language of the provision in the legislation?
                                                                 Mr. PENIN. Congressman Meuser, thank you very much. Yes,
                                                              that was our understanding. And as I mentioned in my testimony,
                                                              this was our lifeline. And then the interpretation came after the
                                                              fact. And I think that is kind of where we are today. It was an in-
                                                              terpretation given after the fact and that is kind of what surprised
                                                              a number of us in passing the torch.
                                                                 Mr. MEUSER. And I realize there are many, many dynamics. In
                                                              fact, there is facing a business, any business, engineering contract,
                                                              whatever it might be, particularly with a pandemic coming along,
                                                              particularly even in my state where outdoor construction was shut
                                                              down for a while with state contracts, contracts with employees not
                                                              able to come in out of fear, out of having COVID, out of family
                                                              members, out of children at home. So it was a very upheaveled pe-
                                                              riod. And I am certainly on the side of small business.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00021   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              18

                                                                 But let me ask you this. If there is a guaranteed revenue stream
                                                              that would be ascertained and made clear, the whole idea behind
                                                              PPP was to sustain a small business during a loss of revenue pe-
                                                              riod for the purpose of not losing them over the short term and the
                                                              long term and not having them go on unemployment.
                                                                 Now, that being the case, is all your business by the way con-
                                                              tracted this way or is it just a percentage? Is it 50 percent of your
                                                              revenue comes from the contracts that are affecting the potential
                                                              PPP?
                                                                 Mr. PENIN. Yes, sir. I assume that question is for me. Yes, sir.
                                                              I would say that the majority of our work comes from government
                                                              contracting. We are a small company. Most of that is as a sub-
                                                              consultant to larger state and national or international companies.
                                                              But it passes down to us because we still have to go through our
                                                              FDOT in our case audit. And that is where this interpretation is
                                                              going to be implemented. So yes, sir, most of our business is gov-
                                                              ernment-based. The long-term contracts are essential for small
                                                              businesses because of the stability that it provides.
                                                                 Mr. MEUSER. Right. I am just trying to get to where the rev-
                                                              enue loss—did you suffer revenue loss during this time period?
                                                                 Mr. PENIN. Yes. Yes, we did. Yes. We kept our employees. We
                                                              kept our employees but we had tremendous losses in revenue be-
                                                              cause, I mean, we came to a screeching halt.
                                                                 Mr. MEUSER. Okay. Well, that pretty much answers my ques-
                                                              tion then and should uncover any doubts that the original intent
                                                              of this PPP should be upheld.
                                                                 What about the second round of PPP, did you apply for that?
                                                                 Mr. PENIN. We have not applied for that. We have not applied
                                                              for that.
                                                                 Mr. MEUSER. Okay. Very good.
                                                                 Mr. Chairman, I do not have any more questions. I yield back.
                                                              Thank you.
                                                                 Chairman MFUME. Thank you, Mr. Meuser.
                                                                 We are going to start the second round of questioning, and I will
                                                              lead that off by asking Mr. Bingham if he would help put some con-
                                                              text into this discussion. I think we all know what the purpose or
                                                              the stated purpose of FAR 31 is, but can you tell me when the prin-
                                                              ciples of FAR, part 31 kick in? Is there a certain requirement, num-
                                                              ber of requirements, or something else that you might be able to
                                                              share with us in terms of its implementation?
                                                                 Mr. BINGHAM. Yes. Yes. Thank you for the question.
                                                                 The requirements of FAR 31 kick in when there is a sole source
                                                              or when there is procurement of a cost reimbursement contract or
                                                              a sole source procurement where it is a situation where the con-
                                                              tractor has to provide cost information, you know, the cost estimate
                                                              to the government customer. And so it is under circumstances of
                                                              that nature. If a contractor, if there are sealed bids, in other words,
                                                              there was adequate competition, then the government buyer is sup-
                                                              posed to base its decisions on the price offered by various com-
                                                              petent contractors and not get into what their cost history is or
                                                              what their indirect costs are or their direct costs, any of that type
                                                              of information. That is the way they are intended to focus it.
                                                                 And I will just add to the discussion about the indirect cost rates.
                                                              The intended approach in the FAR with regard to future indirect




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00022   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              19

                                                              cost rates is not that you just take the indirect rate for a past year
                                                              and assume that it will be matched going forward. That would be
                                                              contrary in my interpretation to both the FAR and the audit guid-
                                                              ance from the DCAA, for example. And so the issues seem to be
                                                              related to this idea that some agencies, some state-related agencies
                                                              are just forcing the situation where whatever the past indirect rate
                                                              was, that indirect rate will be all that is allowed in some future
                                                              year.
                                                                 I hope I answered your question.
                                                                 Chairman MFUME. You did, but I am going to ask you to step
                                                              out on a limb and tell us how you would fix this if you had the abil-
                                                              ity to do so overnight.
                                                                 Mr. BINGHAM. Yeah, I think I agree with Ms. Moser in the idea
                                                              of guidance. I think if the state departments of transportation, if
                                                              they did more what the Federal government auditors do, the DCAA
                                                              auditors do looking at the guidance there, you know, it is in FAR
                                                              42 and 44, I believe, and then not this recent DCAA memorandum
                                                              to regional directors but back to the DCAA’s contract audit manual
                                                              on how you audit indirect rates and how you audit forward pricing
                                                              rates, these indirect rate that are going into the future. If they fol-
                                                              low that type of guidance, my impression is that would solve a lot
                                                              of this. I do not think they are following that type of guidance right
                                                              now. I think it sounds like they are imposing that the same past
                                                              indirect rate must be used going forward. So that would be my ‘‘I
                                                              am out on a limb.’’ That is about as far out on the limb as I will
                                                              go. Thank you.
                                                                 Chairman MFUME. Well, thank you, sir.
                                                                 I want to yield to the Ranking Member, Ms. Salazar.
                                                                 Ms. SALAZAR. This question is for Mr. Bingham and for Ms.
                                                              Moser as well and Mr. Penin, three of you.
                                                                 If by any chance this interpretation of the FAR stance and the
                                                              DoD does not change, they cease the way that they do business
                                                              with you, in which way not only will it affect your decision to con-
                                                              tinue working with the government, or will you then decide to seek
                                                              other work in the private sector alone? How will this change your
                                                              future is basically what I would like to hear from you?
                                                                 And we will start with you, Mr. Penin.
                                                                 Mr. PENIN. thank you very much for the question.
                                                                 If the interpretation of the FAR stands, it will adversely affect
                                                              our multiplier and therefore, our ability to continue to work on gov-
                                                              ernment contracts.
                                                                 I mentioned earlier, in our case, in our particular case it would
                                                              be approximately 25 percent of our multiplier would be affected.
                                                              We would go from 1.25 to 1.0 and that is a huge impact on our
                                                              business. The minority companies and small businesses rely on the
                                                              government because of the long-term contracts that we can obtain
                                                              from government. In this case, if this rate were to go on for further
                                                              years then we would be punished by the same percentage for mul-
                                                              tiple year contracts and in some cases it would impact multiple
                                                              contracts. So for us that would be a deterrent from pursuing gov-
                                                              ernment contracts.
                                                                 The private sector is on a rebound. Whether we would con-
                                                              centrate on that alone would have to be a financial decision that
                                                              I am not 100 percent sure right now that I can make but we see




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00023   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              20

                                                              that if we cannot rely on one. You know, we have to be resilient.
                                                              That is what makes us survive. I told you we have been in business
                                                              for 32 years. So we will look for whatever opportunity we can to
                                                              get to next year and the next year and so forth and so on. But I
                                                              would say that it would certainly impact our ability to, and our de-
                                                              sire to contract with government under those conditions. Thank
                                                              you.
                                                                 Ms. SALAZAR. Ms. Moser?
                                                                 Ms. MOSER. So again, I do not contract directly with the govern-
                                                              ment. I just advise companies that do. So I am really not in a posi-
                                                              tion to address the issue.
                                                                 Ms. SALAZAR. What would be your advice to those clients?
                                                              What would be your advice?
                                                                 Ms. MOSER. So, again, I really think the issue, if the Federal
                                                              Highway Administration issued guidance, each of the state agen-
                                                              cies, and our firm does these indirect rate audits for many engi-
                                                              neering firms and deals with many state auditors, the state DOT
                                                              agencies are looking for guidance. We have reached out to all of
                                                              them. They are asking for guidance from Federal Highway Admin-
                                                              istration so I think absent any guidance then they feel like they do
                                                              not really have a choice on what they do. So I really think Highway
                                                              providing guidance and recommendations on what is the purpose
                                                              of the indirect rate audit and how should it be used going forward
                                                              into future——
                                                                 Ms. SALAZAR. I am going to interrupt you so I can give the op-
                                                              portunity to Ms. Greenleaf, which I did not recognize and then to
                                                              Mr. Bingham.
                                                                 Ms. GREENLEAF. Thank you for the——
                                                                 Ms. SALAZAR. You have 2 minutes. Yeah.
                                                                 Ms. GREENLEAF. Thank you for the opportunity to respond.
                                                                 I think the one point I would like to make is when I took my PPP
                                                              loan, it was really under enormous duress. Our business was dis-
                                                              rupted. We had to work remotely. And the idea that we would end
                                                              up as part of a very, very small sector of the entire PPP universe
                                                              that would not be able to take full advantage of the PPP loan and
                                                              the original intent is what is driving my being here today. So, I
                                                              agree with what Ms. Moser is saying about good guidance coming
                                                              from a possible [inaudible] step in the right direction, but I think
                                                              for ACEC, what I would like to drive home is that we would like
                                                              to be treated like every other company that took a PPP loan out.
                                                                 Ms. SALAZAR. Just 1 minute 35 seconds to Mr. Bingham.
                                                                 Mr. BINGHAM. Thank you for this opportunity to respond. I will
                                                              just say, and I am an advisor to companies as well, but I think the
                                                              guidance in FAR 42-7 and the DCAA’s guidance on this point about
                                                              the indirect rates, that you do not blindly accept their past year as
                                                              the future year and forecast that into the future. I think if a gov-
                                                              ernment entity was telling me that they were going to force me to
                                                              have the same rate in the past as the future, I think I may be able
                                                              to read them passages from FAR 42-7 in the DCAR manual to
                                                              show them why that is inappropriate. Thank you.
                                                                 Ms. SALAZAR. Thank you. And I would like to recognize Mem-
                                                              ber Stauber. He just joined as Chairman.




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00024   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              21

                                                                 Chairman MFUME. Yes. Yes. I will do that in his turn. He actu-
                                                              ally, for the record, was with us earlier and stepped away so we
                                                              are glad that you are back, Ms. Stauber.
                                                                 The Chair at this point will recognize the gentlewoman from Illi-
                                                              nois, Ms. Newman, for the second round.
                                                                 Ms. Newman? Are you back with us?
                                                                 Okay, so let’s do this. I will go to the gentleman from Minnesota,
                                                              Mr. Stauber.
                                                                 Mr. STAUBER. Thank you, Mr. Chair. And thank you for all the
                                                              witnesses. I really appreciate your time.
                                                                 You know, at a time when our small businesses are trying to re-
                                                              cover from the crisis, for small contractors, the continued changes
                                                              in guidance and memorandums from government agencies have
                                                              caused a lot of headaches and confusion.
                                                                 Mr. Penin, what is your reaction or your thoughts to the govern-
                                                              ment’s motive of prevention of double dipping?
                                                                 Mr. PENIN. Thank you very much, Congressman.
                                                                 I do not believe that double dipping applies, and I say that sim-
                                                              ply because when we applied for the PPP loan and we processed
                                                              our paperwork for forgiveness, we consider that as a self-standing
                                                              item and not something that we were going to be penalized for
                                                              later.
                                                                 Mr. STAUBER. Okay. Thank you.
                                                                 My next question is for Ms. Greenleaf. Given your position with
                                                              ACEC, what are you seeing from this particular group of busi-
                                                              nesses? Are many of them seeking loan forgiveness or not? And
                                                              have any of your members decided to forgo forgiveness or even give
                                                              the loans back due to this confusion?
                                                                 Ms. GREENLEAF. Yeah, I think that is a great question, and
                                                              thank you for asking it.
                                                                 I think our members are waiting to see what comes out of Fed-
                                                              eral Highway for final guidance. For me, I did apply for forgiveness
                                                              and my firm did receive it, but I have been checking with col-
                                                              leagues and it is a very inconsistent approach. People would like
                                                              to apply for forgiveness. They would like to understand the rami-
                                                              fications if they do. Some of the smaller firms like mine, I may
                                                              have to make some business decisions about who my clients might
                                                              be for the next year or two and point out that on top of the need
                                                              to really reach a conclusion that we can all make decisions from
                                                              is the fact that the administration is trying to push a very, very
                                                              large and serious infrastructure bill out over the summer and we
                                                              are the firms that will be hopefully having a part in designing all
                                                              of these new transportation projects that may come out. And yet,
                                                              if what we were trying to do is knowing that we are getting into
                                                              these at a potentially greatly reduced rate. It is a very, very dif-
                                                              ficult position to be in.
                                                                 Mr. STAUBER. Thank you. And then Ms. Greenleaf, again, could
                                                              you speak to how this could impact small businesses working on
                                                              state and local transportation projects?
                                                                 Ms. GREENLEAF. So a firm like mine, we have already done the
                                                              math. I know what the reduction in overhead rate and cor-
                                                              responding hourly rates will be if I choose to continue to work for
                                                              our state DOT. And you know, for me they are a very valued client
                                                              and I want to find a way to continue supporting them. Many of the




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00025   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              22

                                                              larger projects at the state level are comprised of very large teams,
                                                              so it could have very large engineering firms that are driving the
                                                              projects. The team is very diverse and there might be, you know,
                                                              10 firms just like mine that are all seeking to gain experience on
                                                              large projects. So it is a big impact.
                                                                 Mr. STAUBER. You know, I look forward to discussions on the
                                                              infrastructure project. I certainly hope it is bipartisan and I cer-
                                                              tainly hope that the minority has input on it because I think it has
                                                              a potential to be really good legislation. We know that it has been
                                                              needed and we just want to have input on it.
                                                                 So Mr. Chair, thank you very much and I yield back to you.
                                                                 Chairman MFUME. Thank you very much, Mr. Stauber.
                                                                 I am going to attempt to go to Ms. Newman again. I do not know
                                                              if she has her speaker system on. I have seen her go by her camera
                                                              a couple of times. And Ms. Newman are you there?
                                                                 I guess she is not.
                                                                 The Chair recognizes Mr. Fitzgerald.
                                                                 Mr. FITZGERALD. Thank you, Mr. Chair. I have no further
                                                              questions at this time. I would yield back. Thank you.
                                                                 Chairman MFUME. Okay. And Ms. Salazar, any further com-
                                                              ments from you?
                                                                 Ms. SALAZAR. I think that we have gathered a lot of informa-
                                                              tion between you, we definitely will fit and figure out how we can
                                                              make this work for the private sector with more clarification as
                                                              some of them have said and with the accounting process having
                                                              been reviewed. And I think that is our duty and our job to make
                                                              it easy for them, for the private sector and at the same time avoid
                                                              any type of double dipping which that is what we are here for.
                                                                 So I am looking forward to working with you, Mr. Chairman. I
                                                              yield back.
                                                                 Chairman MFUME. Well stated, and the feeling is mutual.
                                                                 I want to thank you again. I want to also thank all of our wit-
                                                              nesses who have made time to be with us. Your expert testimony,
                                                              in my opinion, has been invaluable and given the members of this
                                                              Subcommittee a greater understanding of how this complex issue
                                                              impacts small businesses. Small contractors as we all know have
                                                              been devastated by this pandemic. And so it is important that we
                                                              ensure that they are not inflicted with any further harm, and at
                                                              a minimum we must ensure consistency in the application of the
                                                              rules that govern Federal contracting.
                                                                 So I look forward to working with today’s witnesses and Sub-
                                                              committee members to find a path forward so that we might be
                                                              able to come up with an equitable solution for these small busi-
                                                              nesses.
                                                                 And I would ask, as I have mentioned earlier, unanimous con-
                                                              sent that members have 5 legislative days to submit statements
                                                              and supporting materials for the record.
                                                                 Without objection, it is so ordered.
                                                                 If there is no further business to come before the Committee, we
                                                              officially stand adjourned. Thank you all. Have a good day.
                                                                 [Whereupon, at 1:21 p.m., the subcommittee was adjourned.]




SBD026 with DISTILLER

                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00026   Fmt 6633   Sfmt 6633   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              23

                                                                                                   APPENDIX




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 23 here 43803.001


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00027   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              24




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 24 here 43803.002


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00028   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              25




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 25 here 43803.003


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00029   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              26




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 26 here 43803.004


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00030   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              27




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 27 here 43803.005


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00031   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              28




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 28 here 43803.006


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00032   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              29




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 29 here 43803.007


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00033   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              30




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 30 here 43803.008


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00034   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              31




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 31 here 43803.009


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00035   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              32




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 32 here 43803.010


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00036   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              33




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 33 here 43803.011


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00037   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              34




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 34 here 43803.012


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00038   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              35




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 35 here 43803.013


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00039   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              36




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 36 here 43803.014


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00040   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              37




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 37 here 43803.015


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00041   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              38




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 38 here 43803.016


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00042   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              39




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 39 here 43803.017


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00043   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              40




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 40 here 43803.018


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00044   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              41




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 41 here 43803.019


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00045   Fmt 6602   Sfmt 6602   F:\DOCS\43803.TXT   DEBBIE
                                                                                                              42




                                                                                                                  Æ




SBD026 with DISTILLER                                                                                                                                      Insert offset folio 42 here 43803.020


                        VerDate Mar 15 2010   13:28 Aug 10, 2021   Jkt 000000   PO 00000   Frm 00046   Fmt 6602   Sfmt 6011   F:\DOCS\43803.TXT   DEBBIE


File and source

File
CHRG-117hhrg43803.pdf
Size
15,147,900 bytes
SHA-256
4b80935be2b02fa554958c584900e43f72b6dd0aa0b992560b024dd44b0da567
Our copy
CHRG-117hhrg43803.pdf
Original
www.govinfo.gov