Summary

GAO-25-107511, a GAO report to congressional requesters dated May 7, 2025, titled Commuter Rail: Most Systems Struggling to Recover Ridership Following the COVID-19 Pandemic. It updates GAO's 2021 report on commuter rail systems' operations and funding and examines how service, ridership, funding sources and operating costs have changed for the 31 commuter rail systems. The report states that service at 19 systems was near or above pre-pandemic levels from July through December 2024, while service at five systems remained more than 25 percent below. It reports fare revenue 31 percent lower in fiscal year 2023 than in 2019, and a 28 percent increase in nominal operating costs.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“GAO, Commuter Rail: Most Systems Struggling to Recover (GAO-25-107511) (2025).” Original at www.gao.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/gao-commuter-rail-most-systems-struggling-to-recover-gao-25-107511-202-a12fb07521/, SHA-256 bb6f1abe6f78493bae47f0b8c30f9acc8d58b028772248f74f2a7cc5fd11ff0e.

Full text

                 United States Government Accountability Office
                 Report to Congressional Requesters




                 COMMUTER RAIL
May 2025




                 Most S ystems
                 S truggling to Recover
                  Ridership Following
                  the COVID-19
                  P andemic




GAO-25-107 511
                                              May 2025

                                              COMMUTER RAIL

Highlights                                    Most Systems Struggling to Recover Ridership
                                              Following the COVID-19 Pandemic
Highlights of GAO-25-107511, a report to
congressional requesters




Why GAO Did This Study                        What GAO Found
Roughly 5 years after the start of the        Commuter rail is a transit alternative to driving between suburban communities
COVID-19 pandemic, transit agencies           and city centers. Industry-wide data show that the nation’s 31 commuter rail
report that it has significantly affected     systems as a whole are providing service above pre-pandemic levels, but
how individuals use and prioritize            significant variation exists by system. GAO’s analysis of data from the
public transit in their daily activities.     Department of Transportation (DOT) shows that service at 19 systems was near
Many rail systems historically operated       or above pre-pandemic levels from July through December 2024. However,
to serve passengers riding to and from        service at five systems remains more than 25 percent below pre-pandemic
city centers. Commuter rail was               levels, and service at the remaining seven systems varies between 8.5 and 23.7
particularly affected by the pandemic
                                              percent below. DOT data also show that ridership for most systems continues to
and related increased telework. In
                                              lag behind service levels, though substantial variation also exists. At six systems,
response to the pandemic, Congress
provided over $69 billion in relief           ridership from July through December 2024 had recovered or nearly recovered
funding to the transit industry. The          from 2019 levels but were below 2019 levels for the remaining 25 systems.
federal public health emergency ended         Officials from some of the 10 systems GAO interviewed identified ways they have
in 2023.                                      adapted service to attract riders and better meet changing passenger needs.
                                              These adaptations include expanding operations beyond traditional commuting
GAO was asked to provide an update            hours, offering free fares and flexible passes for certain passengers (e.g., youth
to its 2021 report on the status of           passes), and strategically expanding and adapting service based on community
commuter rail systems’ operations and         needs and feedback.
funding. This report examines how,
since the COVID-19 pandemic, (1)
commuter rail service and ridership
                                              Data from GAO’s survey of commuter rail systems show that fare revenue from
have changed; and (2) funding sources         riders was 31 percent lower in fiscal year 2023 for all systems, compared to
and operating costs for these systems         2019. To help offset this reduction in fare revenue, commuter rail systems
have changed.                                 reported increases in the percentage of their total funding comprised of federal,
                                              local, or other sources. COVID-19 relief funding comprised a significant portion of
GAO analyzed DOT service and                  the 2023 increase in federal funding (see figure). As of February 2025, officials
ridership data from January 2019              from 15 of 22 systems that responded to GAO’s request said they did not have
through December 2024 for the                 any COVID-19 funding remaining.
nation’s 31 commuter rail systems.
GAO also collected and analyzed               Commuter Rail Systems’ Total Funding by Source, Fiscal Years 2019, 2023
funding and cost data for these
systems for fiscal year 2023 using a
web survey and compared these data
to fiscal year 2019 data.
GAO also reviewed relevant federal
statutes and guidance and interviewed
DOT officials, industry association
representatives, and a
nongeneralizable sample of 10 transit
agencies operating commuter rail
systems. These agencies were                  Note: Other funding can include funding from fees paid to use existing track, sale of assets, parking
selected based on ridership levels and        fees, or other sources.
whether the agencies offered multiple         The vast majority of systems also reported increased operating costs in fiscal
transit modes, among other things.
                                              year 2023 compared to 2019, with a 28 percent increase in nominal operating
                                              costs across all systems. According to officials GAO interviewed and GAO’s
For more information, contact Andrew Von Ah
                                              analysis, inflation contributed substantially to the increase in costs. Beyond
at vonaha@gao.gov.                            inflation, officials also said that labor and material costs contributed to higher
                                              operating costs, which are affecting systems’ ability to plan and implement
                                              projects necessary for future operations.
                                                                                                United States Government Accountability Office
Contents


Letter                                                                                 1
               Background                                                              3
               Over Half of Systems Are Providing Service Near or Above Pre-
                 Pandemic Levels, but Most Systems’ Ridership Has Not
                 Recovered                                                             7
               Systems Have Relied on Funding Sources Other than Fares and
                 Reported Higher Operating Costs Compared to Pre-Pandemic            17
               Agency Comments                                                       22

Appendix I     U.S. Commuter Rail System Snapshots                                   23



Appendix II    Federal Funding Related to Commuter Rail Provided Under the
               Infrastructure Investment and Jobs Act (IIJA)                         55



Appendix III   GAO Contact and Staff Acknowledgments                                 62


Figures
               Figure 1: Map of 31 Commuter Rail Systems in the U.S.                   4
               Figure 2: Total Commuter Rail Service (Measured in Vehicle
                        Revenue Hours), January 2019 through December 2024             8
               Figure 3: Commuter Rail System Service Recovery, Percentage
                        Change in Total Vehicle Revenue Hours Between July–
                        December 2019 and July–December 2024                         10
               Figure 4: Total Commuter Rail Ridership (Measured in Unlinked
                        Passenger Trips), January 2019–December 2024                 11
               Figure 5: Commuter Rail System Ridership Recovery, Percentage
                        Change in Total Unlinked Passenger Trips Between
                        July–December 2019 and July–December 2024                    13
               Figure 6: Commuter Rail Systems’ Total Funding by Source,
                        Fiscal Years 2019, 2023                                      18




               Page i                                 GAO-25-107511 Commuter Rail Systems
Abbreviations

ARPA                American Rescue Plan Act
CRRSAA              Coronavirus Response and Relief Supplemental
                    Appropriations Act, 2021
Denver RTD          Denver Regional Transportation District
DOT                 Department of Transportation
FRA                 Federal Railroad Administration
FTA                 Federal Transit Administration
FY                  fiscal year
IIJA                Infrastructure Investment and Jobs Act
MBTA                Massachusetts Bay Transportation Authority
NTD                 National Transit Database
SEPTA               Southeastern Pennsylvania Transit Authority
SMART               Sonoma-Marin Area Rail Transit
VRE                 Virginia Railway Express




This is a work of the U.S. government and is not subject to copyright protection in the
United States. The published product may be reproduced and distributed in its entirety
without further permission from GAO. However, because this work may contain
copyrighted images or other material, permission from the copyright holder may be
necessary if you wish to reproduce this material separately.




Page ii                                            GAO-25-107511 Commuter Rail Systems
                         Letter




4 4 1 G St. N . W.
 Washington, DC 2054 8




                         May 7, 2025

                         The Honorable S am Graves
                         Chairman
                         Committee on Transportation and Infrastructure
                         House of Representatives

                         The Honorable Troy E. Nehls
                         House of Representatives

                         The COVID-19 pandemic had a significant effect on public transit across
                         the country. According to the Federal Transit Administration (FTA), stay-
                         at-home orders in 2020 led to ridership dropping 81 percent between April
                         2019 and April 2020, and the vast majority of transit agencies reducing
                         service. FTA also found that commuter rail, a transit alternative to driving
                         between suburban communities and city centers, was particularly affected
                         by the pandemic.

                         In response to the COVID-19 pandemic, Congress enacted three relief
                         laws that provided over $69 billion in funding to the transit industry. FTA,
                         within the Department of Transportation (DOT), distributed these funds to
                         transit agencies through existing formula grant programs. 1 The laws gave
                         recipients flexibilities to use the funding for a wide array of payroll and
                         operating expenses, and some of the funding was required to be used for
                         these purposes to the maximum extent possible. 2

                         Roughly 5 years after the start of the COVID-19 pandemic— and almost 2
                         years since the federal public health emergency ended— transit agencies
                         report that the pandemic has significantly affected how individuals use
                         and prioritize public transit in their daily activities. For example, changes
                         in telework patterns during this time affected the demand for transit
                         service that has historically followed 9:00 a.m. to 5:00 p.m. commuting




                         1FTA distributed COVID-19 relief funding for transit primarily through the Urbanized Area
                         Formula program and the Formula Grants for Rural Areas program. Formula programs
                         allocate funding to recipients using a distribution formula set by statute.
                         2If the recipient certified to FTA that the recipient had not furloughed any employees, then
                         the recipient was not required to prioritize payroll and operating expenses over other
                         expenses.



                         Page 1                                              GAO-25-107 511 Commuter Rail Systems
patterns. 3 Many commuter rail systems have operated these schedules
primarily to serve passengers riding to and from city centers.

You requested that we provide an update to our 2021 report on the status
of commuter rail systems’ operations and funding. 4 This report examines
how, since the COVID-19 pandemic, (1) commuter rail service and
ridership have changed; and (2) funding sources and operating costs for
these systems have changed. We also present information on specific
commuter rail systems in appendix I.

To address these objectives, we analyzed service, ridership, and cost
data from fiscal year (FY) 2019 through FY 2023 for the 31 commuter rail
systems within the FTA’s National Transit Database (NTD). 5 We reported
the most recent data by calendar month for each system, including
ridership data through December 2024. 6 In addition to the data available
in NTD, we also conducted a web-based survey to collect and analyze
data on systems, funding, and costs for FY 2023 from the 31 commuter
rail systems. Where applicable, we adjusted data for inflation to 2023
dollars. 7

We assessed the reliability of the data using several methods, including
reviewing NTD documentation, interviewing DOT officials, and conducting
several data checks. To account for data limitations we found within the
NTD, we did not use data on operating cost metrics marked questionable
by FTA (e.g., if the transit agency did not follow prescribed procedures or
if the estimates are deemed unreasonable) and requested more specific
revenue data from surveyed transit agencies. After excluding the NTD

3On January 20, 2025, a Presidential memorandum required the heads of executive
branch agencies to take necessary steps to require employees to return to work in-person
full time at their respective duty stations. See Return to In-Person Work Memorandum for
the Heads of Executive Departments and Agencies, 90 Fed. Reg. 8251 (Jan. 20, 2025).
4GAO, Commuter Rail: Information on Benefits and Funding Challenges for Service in
Less Urbanized Communities, GAO-21-355R (Washington, D.C.: Apr. 1, 2021).
5The 31 commuter rail systems include all systems in the U.S. classified as commuter rail,
as well as certain hybrid rail systems and two legacy Amtrak lines identified as commuter
rail systems within the NTD. NTD data are reported by transit agencies at the end of that
agency’s own fiscal year, which may vary across agencies.
6Transit agencies report ridership (in unlinked passenger trips, meaning passengers are
counted each time they board) and service metrics monthly to NTD.
7We used the FY 2023 gross domestic product index ending in September to adjust for
inflation in this report. Transit agencies may end their fiscal year in different months
(including June, September, and December).




Page 2                                                GAO-25-107511 Commuter Rail Systems
                        data marked questionable, we determined that both NTD and our survey
                        were sufficiently reliable for reporting on the 31 systems’ service,
                        ridership, funding, and costs.

                        In addition, we reviewed federal statutes, regulations, and DOT
                        documentation and guidance related to commuter rail operations and
                        funding. We conducted interviews with a non-generalizable selection of
                        10 transit agencies operating commuter rail systems. 8 To incorporate a
                        variety of perspectives, we selected these systems to ensure diversity in
                        ridership recovery compared to pre-pandemic levels, whether transit
                        agencies operated only commuter rail systems or multiple transit modes,
                        whether the agencies used contractors to operate their commuter rail
                        service, and the geographic locations transit agencies served. We also
                        interviewed one commuter rail industry association (the Commuter Rail
                        Coalition) and DOT officials about issues facing commuter rail systems.

                        We conducted this performance audit from April 2024 to May 2025 in
                        accordance with generally accepted government auditing standards.
                        Those standards require that we plan and perform the audit to obtain
                        sufficient, appropriate evidence to provide a reasonable basis for our
                        findings and conclusions based on our audit objectives. We believe that
                        the evidence obtained provides a reasonable basis for our findings and
                        conclusions based on our audit objectives.


Background
Commuter Rail Systems   Commuter rail systems are operated by transit agencies, which may also
                        operate other transit modes such as bus, subway, light rail, or ferry. 9 In
                        the U.S., commuter rail systems are located in or around metropolitan
                        areas (see fig. 1). The nation’s 31 commuter rail systems vary in the


                        8The 10 commuter rail systems we selected for interviews were Denver Regional
                        Transportation District (Denver RTD), Massachusetts Bay Transportation Authority
                        (MBTA), New Jersey Transit, Northstar, Southeastern Pennsylvania Transit Authority
                        (SEPTA), Sonoma-Marin Area Rail Transit (SMART), SPRINTER, TEXRail, Tri-Rail, and
                        Virginia Railway Express (VRE).
                        9According to FTA, light rail is an electrically propelled train operating primarily at surface
                        level. Comparatively, commuter rail passenger transportation means short-haul rail
                        passenger transportation in metropolitan and suburban areas usually having reduced fare,
                        multiple-ride, and commuter tickets and morning and evening peak period operations. 49
                        U.S.C. § 24102. Commuter rail passenger transportation operates on existing railway
                        tracks also used by Amtrak to provide intercity rail passenger transportation and railroads
                        that provide freight transportation.




                        Page 3                                                GAO-25-107511 Commuter Rail Systems
                                        number of stations they operate, areas they serve, and miles of track they
                                        use, among other system characteristics. 10

Figure 1: Map of 31 Commuter Rail Systems in the U.S.




                                        Commuter rail service can vary based on the days of the week that
                                        service is operated, the direction the trains run (both directions at once or
                                        only the direction of peak service), and the hours in service. Service
                                        levels can be measured in a number of ways, including by vehicle
                                        10See appendix I for summaries of the operations, ridership, and funding sources for all 31
                                        commuter rail systems across the country.




                                        Page 4                                             GAO-25-107511 Commuter Rail Systems
                    revenue hours and vehicle revenue miles. These measures account for
                    the hours or miles that trains are operating and can carry passengers,
                    and do not include when trains do not carry passengers (e.g., during
                    maintenance testing or training). Ridership is typically measured by
                    “unlinked passenger trips,” which include the number of passengers who
                    board public transportation vehicles. Passengers are counted each time
                    they board a vehicle, including transfers.

Federal Roles and   Within DOT, the Federal Railroad Administration (FRA) and FTA oversee
Responsibilities    commuter rail operations. 11 FRA oversees safety in rail transportation,
                    and FRA’s Passenger Rail Division provides technical expertise and
                    direction in the development and implementation of rail safety programs
                    applicable to commuter rail operations. FRA also administers federal
                    grant funds to eligible rail carriers that provide intercity rail passenger
                    transportation (Amtrak) and freight rail transportation for eligible
                    infrastructure, service, safety improvement, and congestion relief projects.
                    This funding may benefit commuter rail systems due to their shared
                    infrastructure with Amtrak and freight rail systems. However, FRA is
                    generally prohibited from providing grant funding for commuter rail
                    passenger transportation. 12 FTA promotes the development,
                    improvement, and safety of public transportation systems, which include
                    commuter rail systems, through a variety of federal grant programs to
                    local transit agencies. 13

                    FTA also administers the NTD, which collects, validates, and publishes
                    financial, operating, geographic service area coverage, and asset
                    condition information for transit systems in the U.S. Transit agencies that
                    receive grants from the FTA under the Urbanized Area Formula program
                    or Formula Grants for Rural Areas program are required to submit data to

                    11For the purposes of FRA safety oversight, rapid transit operations in an urban area that
                    are not connected to the general railroad system are excluded from FRA’s safety
                    oversight. FRA will presume that an operation is an urban rapid transit operation if there is
                    not a statutory determination that Congress considers a particular service to be commuter
                    rail and the operation is a subway or elevated operation with its own track system on
                    which no other railroad may operate, has no highway-rail crossings at grade, operates
                    within an urban area, and moves passengers from station to station within the urban area
                    as one of its major functions. 49 C.F.R. Part 209, Appendix A. According to FTA, these
                    systems, also known as fixed guideway systems, are subject to FTA’s safety oversight
                    program.
                    1249 U.S.C. § 22905(f).

                    13While FTA grant programs can be used to fund eligible safety improvements in
                    commuter rail systems, the FRA has primary safety jurisdiction and oversight
                    responsibilities, and commuter railroads must comply with FRA safety regulations.




                    Page 5                                               GAO-25-107511 Commuter Rail Systems
                        the NTD. Among the required data are annual operating expenses,
                        service levels, ridership levels, and funding sources.

Commuter Rail Funding   Transit agencies fund their commuter rail systems through federal
                        funding, state and local funding (e.g., sales taxes), and passenger fares
                        and agency-generated revenue (e.g., advertising), among other sources.
                        Regarding federal funding, FTA provides funding to transit agencies
                        through formula and competitive grant programs. FTA distributes formula
                        grant funding based on specific parameters set by Congress, and transit
                        agencies decide how to disburse this funding across their various modes
                        (e.g., commuter rail and bus) for a wide variety of eligible expenses. FTA
                        awards competitive grants for specific eligible projects through a
                        competitive application and selection process. In general, transit
                        agencies, with some exceptions, can only use federal funding for capital
                        expenses. The Infrastructure Investment and Jobs Act (IIJA) provided
                        funding for a wide variety of formula and competitive grant programs that
                        are available to fund commuter rail (see appendix II). 14

                        Due to the effects of the COVID-19 pandemic, the CARES Act, the
                        Coronavirus Response and Relief Supplemental Appropriations Act, 2021
                        (CRRSAA), and the American Rescue Plan Act (ARPA) provided funding
                        that agencies could use for operating expenses related to COVID-19
                        response and recovery. 15 While CARES Act and CRRSAA funding has no
                        deadline by which the funds must be used, ARPA funding must be
                        disbursed by September 30, 2029.




                        14IIJA, Pub. L. No. 117-58, 135 Stat. 429 (2021). On January 20, 2025, the Administration
                        issued an Executive Order to pause the disbursement of certain funds appropriated
                        through the IIJA and directed agencies to review their processes, policies, and programs
                        for issuing grants and other financial disbursements under the IIJA for consistency with
                        the law and the policy of the Executive Order. See Exec. Order 14154, Unleashing
                        American Energy, 90 Fed. Reg. 8353 (Jan. 20, 2025).
                        15CARES Act, Pub. L. No. 116-136, 134 Stat. 281, 599-600 (2020); CRRSAA, Pub. L. No.
                        116-260, 134 Stat. 1909, 1947 (2020); ARPA, Pub. L. No. 117-2, 135 Stat. 4, 72 (2021).




                        Page 6                                            GAO-25-107511 Commuter Rail Systems
Over Half of Systems
Are Providing Service
Near or Above Pre-
Pandemic Levels, but
Most Systems’
Ridership Has Not
Recovered
Service Levels Vary        Industry-wide data show that commuter rail service is above pre-
Significantly by System,   pandemic levels (see fig. 2). Specifically, commuter rail service levels in
                           total were about 2.7 percent above pre-pandemic levels for the last 6
with Over Half Providing
                           months ending in December 2024, compared to the same time period in
Service Near or Above      December 2019. 16
Pre-Pandemic Levels




                           16As of February 2025, four commuter rail systems had not submitted complete 2024 data
                           to the NTD. The 2.7 percent calculation does not include the missing months for those
                           four systems, therefore it results in a slight undercount of vehicle revenue hours in those
                           months. Since the four systems in total represent only 1.3 percent of the industry vehicle
                           revenue hours from January 2019 through December 2024, it would not significantly affect
                           the calculation of the 2024 industry-wide service levels.




                           Page 7                                             GAO-25-107511 Commuter Rail Systems
Figure 2: Total Commuter Rail Service (Measured in Vehicle Revenue Hours), January 2019 through December 2024




                                       However, industry-wide data mask significant variations that exist among
                                       systems. Over half of commuter rail systems (19 of 31) were operating
                                       near or above pre-pandemic service levels from July through December
                                       2024 compared to the same 6-month period in 2019, based on our
                                       analysis of NTD data (see fig.3). 17

                                       Service levels among those 19 systems ranged from Metrolink (in
                                       Southern California) operating slightly below pre-pandemic levels (-4.1
                                       percent) to Denver RTD increasing service significantly with a new




                                       17This analysis was based on vehicle revenue hours. FTA defines vehicle revenue hours
                                       as the hours that vehicles actually travel while in revenue service (the time when a vehicle
                                       is available to the public). Vehicle revenue hours include layover and recovery time but
                                       exclude hours for service without passengers (e.g., when changing routes or traveling to
                                       maintenance facilities), operator training, vehicle maintenance testing, and other non-
                                       revenue uses of vehicles. We define “nearly” recovered as being within 5 percent of pre-
                                       pandemic service for the given time period. For systems with incomplete data
                                       (Downeaster, Keystone, Shore Line East, WeGo Star) we calculated this 6-month
                                       percentage using the most recent 6-month time period available in NTD and compared
                                       that to the same 6-month time period in 2019.




                                       Page 8                                              GAO-25-107511 Commuter Rail Systems
commuter rail line (+49.3 percent). 18 Among the remaining 12 systems,
service at five systems was more than 25 percent below pre-pandemic
levels, and service at seven systems varied between 8.5 and 23.7
percent below pre-pandemic levels. Transit agency officials from one
system operating below 2019 levels told us that they are waiting to
assess demand for commuter rail service before considering any increase
in service. As such, these officials said they are planning for it to take
longer to return to their previous service levels.




18We refer to systems by name when referring to our analyses of NTD or survey data. We
anonymize system information when discussing information from our interviews. Service
levels here do not capture schedule changes that commuter rail systems may have made
since the pandemic. For example, transit agencies may have shifted schedules to different
times of day, while maintaining the overall number of hours that trains are running in a 24-
hour period.




Page 9                                              GAO-25-107511 Commuter Rail Systems
Figure 3: Commuter Rail System Service Recovery, Percentage Change in Total Vehicle Revenue Hours Between July–
December 2019 and July–December 2024




                                       Note: As of February 2025, four systems had submitted incomplete service data to the National
                                       Transit Database (Downeaster, Keystone, Shore Line East, WeGo Star). For these systems, we
                                       calculated the percentage change using the most recent 6-month time period available in the National
                                       Transit Database and compared that to the same 6-month time period in 2019.


                                       We did not identify a connection between service level recovery and the
                                       size of a commuter rail system. 19 For example, there were both smaller
                                       and larger systems among those that recovered to near or above pre-
                                       pandemic service levels—including the smaller system A-Train in Denton

                                       19Here, system size refers to the total miles of track (total directional route miles) of the
                                       commuter rail system.




                                       Page 10                                                 GAO-25-107511 Commuter Rail Systems
                                       County, Texas (+11.5 percent) and the larger Long Island Rail Road
                                       (+18.4 percent).

                                       Our survey of the 31 systems also found that most commuter rail systems
                                       continue to operate the same number of stations as they did before the
                                       pandemic. Twenty-two systems reported that they operated the same
                                       number of stations in FY 2023 as they did in FY 2019. Of the remaining
                                       nine systems, seven added at least one station and two closed one or
                                       more stations. An official from one system that closed stations during this
                                       time period told us they did so because five stations had little ridership
                                       even before the pandemic. For that system, the closed stations were
                                       already located near other stations on the commuter rail line.

Ridership Has Been                     Our analysis of NTD data show that commuter rail ridership has been
Slowly Rebounding, with                slowly rebounding from pandemic lows. After significantly declining in the
                                       first half of 2020, total ridership summed across all 31 systems has
Most Systems’ Ridership
                                       steadily increased (see fig. 4). However, total ridership for all 31 systems
Remaining Below Pre-                   from July through December 2024 remained about 31 percent below pre-
Pandemic Levels                        pandemic levels (July through December 2019).

Figure 4: Total Commuter Rail Ridership (Measured in Unlinked Passenger Trips), January 2019–December 2024




                                       Note: Transit agencies report commuter rail ridership to the National Transit Database monthly,
                                       measured in unlinked passenger trips. Unlinked passenger trips include the number of passengers




                                       Page 11                                                GAO-25-107511 Commuter Rail Systems
who board public transportation vehicles. Passengers are counted each time they board a vehicle,
including transfers.


Similar to data for individual systems’ service levels, NTD ridership data
show significant variation among systems’ ridership recovery. 20 For
example, our analysis showed that from July through December 2024,
ridership at six systems had recovered or nearly recovered compared
with the same time period in 2019, while ridership at 17 systems
remained 16 to 46 percent below pre-pandemic levels (see fig. 5). 21
Ridership at the eight remaining systems was 50 percent or more below
pre-pandemic levels. These results show that ridership recovery has
lagged behind commuter rail service recovery for many systems.




20For more detailed ridership and operational information on each commuter rail system,
see the commuter rail snapshots presented in appendix I.
21We define “nearly” recovered as being within 5 percent of pre-pandemic ridership for the
given time period. Note in figure 5 this includes MBTA whose ridership was 3.6 percent
below pre-pandemic levels.




Page 12                                                 GAO-25-107511 Commuter Rail Systems
Figure 5: Commuter Rail System Ridership Recovery, Percentage Change in Total Unlinked Passenger Trips Between July–
December 2019 and July–December 2024




                                       We did not identify a strong connection between ridership recovery and
                                       the size of a commuter rail system. For example, between July and
                                       December 2024, some larger systems like Metra, which connects
                                       neighboring cities to Chicago, remained far below pre-pandemic ridership
                                       (-42 percent) while other larger systems like MBTA, which connects
                                       neighboring cities to Boston, are nearing pre-pandemic ridership (-3.6
                                       percent) over the same time period. Similarly, a smaller system like
                                       SMART is operating with 41 percent higher ridership than before the
                                       pandemic, but the ridership of similarly small Northstar remains roughly
                                       83 percent below pre-pandemic levels.



                                       Page 13                                      GAO-25-107511 Commuter Rail Systems
Despite Structural        As discussed earlier, commuter rail operates on a fixed track and was
Challenges, Some          historically designed to transport people from outer areas to city centers
                          for work and other activities. This structure creates challenges by
Systems Are Trying to
                          reducing a transit agency’s ability to modify its operations in ways such
Adapt Service to Better   as:
Meet Riders’ Needs
                          •   Cutting costs. As documented by FTA, commuter rail has high costs
                              compared to other transit modes like bus service, and it is not as easy
                              to recoup costs by scaling down rail service. 22 We have previously
                              reported that, according to rail officials, commuter rail uses more
                              expensive infrastructure, such as tracks, passenger stations, rail cars,
                              and signaling. 23 In addition, the cost of keeping a rail station open and
                              staffed remains the same each day no matter how many trains stop
                              there. Cutting service also comes with additional risks. As FTA
                              documented and officials at one system told us, cutting service to
                              adapt to reduced ridership introduces the risk of the “death spiral” of
                              transit service for any mode. In other words, reduced service further
                              reduces ridership, leading to further cuts in service, and eventually
                              repeated reductions in ridership and service.
                          •   Adjusting to new telework patterns. Commuter rail systems were
                              designed to transport people into city centers. Therefore, commuter
                              rail operations are particularly affected by changes in telework
                              patterns and related commuting hours, according to officials from two
                              transit agencies and FTA. For example, officials from one transit
                              agency told us about significant differences in ridership on their two
                              rail systems based on telework patterns. Those officials said that they
                              saw ridership drop dramatically on the system that primarily serves
                              workers who were able to telework during the pandemic. However,
                              officials told us that ridership remains much more consistent on the
                              system that serves more workers who are essential to maintain critical
                              infrastructure and continue critical services.
                          •   Changing schedules and stations. Transit agencies can also face
                              challenges implementing schedule changes on commuter rail
                              systems, according to officials from two transit agencies. For instance,
                              a transit agency may be unable to make changes to their system’s
                              schedule because they do not own the track on which the trains run.
                              In these cases, transit agencies may have to negotiate the service
                              schedule they are able to offer with the “host” railroad that owns the

                          22Federal Transit Administration, Effects of the COVID-19 Pandemic on Transit Ridership
                          and Accessibility, FTA Report No. 0268 (Washington, D.C.: August 2024).
                          23GAO-21-355R.




                          Page 14                                           GAO-25-107511 Commuter Rail Systems
    track. 24 It may also be difficult to add or change stations, as building
    track and stations is more expensive than adding stations on a bus
    route, for example. Officials from another transit agency told us that
    two recent transit expansions were more easily implemented with bus
    and light rail compared to commuter rail. These officials said that,
    among other things, additional buses are cheaper to deploy than
    additional trains or stations, and buses use existing roads to operate.
    Overall, transit agencies that operate multiple modes (rail, bus, etc.)
    generally have greater flexibility and more options they can use to
    meet the needs of the community.
Despite these challenges, officials from several of the 10 commuter rail
systems we interviewed identified ways they have adapted service to
attract riders and better meet changing passenger needs:

•   Extending service beyond traditional commuting hours. Officials
    from seven systems said commuting patterns no longer reflect
    traditional 9:00 a.m. to 5:00 p.m. commuting hours in their service
    areas. As a result, officials from five of these systems have expanded
    their commuter rail service beyond traditional commuting hours,
    including adding or expanding weekend or midday train service. One
    system’s officials said that moving to all-day service has been the
    biggest driver of the system’s success in bringing back riders. In
    particular, adding midday service provided an option for workers who
    want to go into an office for a meeting and then return home. Notably,
    four of these five systems own all or most of their respective track,
    according to transit agency officials and documents we reviewed.
    Such ownership mitigated the added challenge of negotiating
    schedule changes for these agencies.
•   Offering free fares or flex/youth passes. Transit agency officials
    from five systems said that their systems have implemented new fare
    or pass structures, including free youth passes and flat weekend
    fares, to increase commuter rail’s appeal to riders. Officials at one
    system said that offering free youth fares encourages families to use
    the system and creates lifelong transit users. For another system,
    officials said offering free youth passes helped build a habit of taking
    transit for new riders. In addition, one transit official attributed some of
    its system’s significant increases in weekend ridership to the agency’s

24As we have previously reported, commuter rail systems can operate some or all of their
trains as “tenants” on the track of another railroad (e.g., Amtrak or a freight railroad),
known as the “host.” GAO, Commuter Rail: Agencies’ Estimates of Operations and
Maintenance Costs for Positive Train Control, GAO-24-106329 (Washington, D.C.: Jan.
10, 2024).




Page 15                                             GAO-25-107511 Commuter Rail Systems
    $10 weekend fare program, which allows riders to use the train all
    weekend for a flat price.
•   Pursuing strategic system expansion. Officials at three commuter
    rail systems told us they are pursuing different types of system
    expansions to increase ridership. The expansions include adding new
    stations and on-demand bus shuttle service beyond the commuter rail
    line, opening previously planned new stations, and providing special
    service to community events. For example, officials at one system
    added shuttle service from the commuter rail station to the county
    airport and wineries in the area. According to the officials, doing so
    helped bridge a service gap between one part of the commuter rail
    line and popular destinations. At another system, officials added train
    service to transport riders to professional sporting events, a popular
    service that was suspended during the pandemic.
•   Adapting service based on community feedback. Two transit
    agencies we interviewed made several commuter rail system changes
    based on community feedback. For instance, officials at one system
    added another morning train based on parent requests to
    accommodate travel to school. Officials said the agency has also tried
    several other service changes based on customer feedback. Officials
    from another system added two late night trains to the system in
    response to feedback from airport employees who did not have a
    transit option for the late-night shift. They discussed the plan with
    airport staff and surveyed employees as a part of this effort.
While officials from some systems said these actions helped their
ridership levels recover, others also identified system characteristics that
aided in their recovery. Officials we interviewed said they benefit from
unique aspects of their communities, including a tourism economy (four),
historically serving essential workers or non-9:00 a.m. to 5:00 p.m.
commuters (three), the consistent ridership demand of their systems’
airport lines (three), and their commuter rail system providing one of the
only available transit alternatives to driving in the area (one).




Page 16                                    GAO-25-107511 Commuter Rail Systems
Systems Have Relied
on Funding Sources
Other than Fares and
Reported Higher
Operating Costs
Compared to Pre-
Pandemic
To Account for Substantial   Following ridership declines during the COVID-19 pandemic, commuter
Drops in Fare Revenue,       rail systems experienced substantial losses in fare revenues. Our survey
                             found that the majority of commuter rail systems (26 of 31) reported lower
the Majority of Systems
                             fares and agency generated revenue (fare revenue) in FY 2023
Have Used More Federal       compared to FY 2019. 25 Across all commuter rail systems, nominal fare
and Other Sources of         revenues decreased 31 percent from FY 2019 to FY 2023. 26
Funding
                             Correspondingly, commuter rail systems reported in our survey that fare
                             revenue made up a smaller percentage of their total funding in FY 2023.
                             Specifically, fare revenue made up almost 43 percent of total funding
                             across all 31 systems in FY 2019 and decreased to 24 percent in FY
                             2023. To offset reduced fare revenues, the majority of commuter rail
                             systems reported increases in federal, local, or other sources of funding
                             (29 of 31). For example, federal funding as a percentage of systems’ total
                             funding roughly doubled, increasing from about 10 percent in FY 2019 to
                             nearly 20 percent in FY 2023, across all systems. COVID-19 relief
                             funding comprised the vast majority of this 9.6 percentage increase (see
                             fig. 6). 27


                             25Passenger fares make up most of transit agency generated revenue, according to the
                             Congressional Budget Office and NTD. As such, we refer to fares and agency generated
                             revenue as “fare revenue” throughout this report. See Congressional Budget Office,
                             Federal Financial Support for Public Transportation (March 2022); Federal Transit
                             Administration, Office of Budget and Policy, National Transit Summaries and Trends 2023
                             Edition (2024).
                             26This sum reflects changes in fare revenues and agency generated revenues as reported
                             in our survey. After adjusting for inflation, fare revenue decreased 41 percent across all 31
                             systems.
                             27As noted above, CARES Act and CRRSAA funding have no deadline by which the funds
                             must be used, but ARPA funding must be disbursed by September 30, 2029.




                             Page 17                                              GAO-25-107511 Commuter Rail Systems
Figure 6: Commuter Rail Systems’ Total Funding by Source, Fiscal Years 2019,
2023




Note: Other funding can include funding from fees paid to use existing track, sale of assets, parking
fees, or other sources.


However, not all systems receive all types of funding or reflect these
industry trends. For example, in FY 2019 and FY 2023, TEXRail did not
receive any state funding, and SunRail (in Florida) did not receive local
funding. In addition, while industry-wide state funding increased slightly,
for VRE, state funding increased from 30 percent to 50 percent of its total
funding. Comparatively, for Rail Runner Express (in New Mexico), state
funding made up 22 percent of its total funding in FY 2019, but it did not
have any state funding in FY 2023. When looking at local funding,
northern California’s Altamont Corridor Express’s local funding decreased
from 24 to 16 percent of its total. Comparatively, A-Train received the
majority of its funding from local sources—87 and 96 percent in FY 2019
and FY 2023, respectively.

All systems have benefitted from COVID-19 relief funding, but this funding
is temporary. Slightly more than half of systems (17) reported in our
survey they were still using federal COVID-19 relief funding in FY 2023. 28
Officials we interviewed from one system with COVID-19 relief funds
remaining explained they are using that funding to continue to cover
operational costs in light of fare revenue remaining below pre-pandemic
levels. Officials from another system told us they are using $30 million of
COVID-19 relief funding for this same purpose, and that it allowed them
to continue to operate. In February 2025, we asked transit agencies if
they had used all COVID-19 funding available for their commuter rail

28The remaining 14 of the 31 surveyed systems reported not using any COVID-19 relief
funding in 2023, though some or all of these systems may have already spent all their
COVID-19 relief funding.




Page 18                                                   GAO-25-107511 Commuter Rail Systems
                            systems. Of the 22 who responded as of February 2025, 15 said they had
                            spent all of the available funding. 29

                            As transit agencies spend remaining COVID-19 relief funding, officials are
                            looking to other sources to offset fare revenue reductions. Officials from
                            one system that ran out of COVID-19 funding said they are considering
                            raising fares to help fill the resulting budget shortfall. However, raising
                            fares could reduce ridership, so whether this strategy will succeed
                            remains unclear. Officials from most (eight of 10) of the systems we
                            interviewed said that they plan to seek funding from sources other than
                            the federal government in the future.

Stakeholders Most           Operating costs have increased since the COVID-19 pandemic,
Frequently Attributed       according to our survey and analysis of NTD data. First, the majority (28
                            of 31) of commuter rail systems reported in our survey that operating
Higher Operating Costs to
                            costs increased from FY 2019 to FY 2023. Across all 31 systems,
Inflation or Labor or       operating costs increased about 28 percent in nominal terms, and 9
Material Cost Increases     percent after adjusting for inflation. 30 Second, NTD data show increases
                            in commuter rail systems’ operating costs across multiple metrics that
                            account for differences in systems’ ridership. Specifically:

                            •   Fare recovery ratio. Fare recovery ratio measures how much of a
                                commuter rail system’s operating costs are covered by its fare
                                revenue. For the 19 commuter rail systems with complete NTD data,
                                the fare recovery ratio decreased from FY 2019 to FY 2023, ranging
                                from a decrease of 14.9 percent to 82.2 percent. 31 Since fare
                                revenues are directly related to ridership, declines in ridership lead to
                                decreases in fares and the fare recovery ratio. Similarly, the fare
                                recovery ratio decreases if operating costs increase.
                            •   Operating costs per passenger trip. Operating costs per passenger
                                trip measures the average operating cost for each passenger that

                            29One of the 15 systems reported it had spent the majority of its COVID-19 relief funding,
                            but a few capital items needed to be closed out.
                            30We have previously reported that commuter rail has high operating costs compared to
                            other transit modes because commuter rail must maintain and manage more infrastructure
                            and equipment. See GAO-21-355R.
                            31While all transit agencies are required to report these metrics to NTD, we excluded data
                            for 12 of the 31 transit agencies with data that FTA identified as “questionable” in NTD,
                            leaving 19 commuter rail systems in our analysis. Of these 19, ridership at four was near
                            or above pre-pandemic levels and ridership at 15 was below. Our survey requested
                            operating and capital cost data from commuter rail systems but did not ask about the NTD
                            metrics.




                            Page 19                                            GAO-25-107511 Commuter Rail Systems
    boards a commuter rail system. For the 19 commuter rail systems
    with complete NTD data, operating costs per passenger trip increased
    from FY 2019 to FY 2023 and, when adjusted for inflation, range from
    an increase of 6.8 percent to 407.3 percent. 32 As a ratio of operating
    costs to passenger trips, this measure of operating costs increases if
    total operating expenses increase or ridership falls.
•   Operating costs per passenger mile traveled. Operating costs per
    passenger mile traveled measures the average operating cost for
    each system to carry one passenger one mile. For the 19 commuter
    rail systems with complete NTD data, operating costs per passenger
    mile traveled increased from FY 2019 to FY 2023, ranging from an
    increase of 0.3 percent to 340.1 percent when adjusted for inflation.
    As a ratio of operating costs to passenger miles traveled, this
    measure increases if operating costs increase, if passengers travel
    shorter distances on their trip, or if there are fewer passengers taking
    trips. The length of a system may affect the distance that passengers
    travel. 33 For example, the Westside Express Service in Oregon is a
    relatively short system, meaning passengers are generally traveling
    fewer miles compared to a longer system like FrontRunner in Utah. As
    such, Westside Express Service’s operating costs per passenger mile
    traveled in FY 2023—around $11 per passenger mile traveled—were
    higher than Frontrunner’s, which were around $0.60.
Officials from our 10 selected systems most frequently cited inflation as
the reason operating costs increased. Specifically, officials from five
systems attributed total operating cost increases primarily to inflation.
Officials from three of these systems added that inflation since the start of
the COVID-19 pandemic had increased operating costs more than
anticipated. Inflation, measured by the gross domestic product price
index, increased about 17 percent throughout the U.S. economy from FY
2019 to FY 2023. However, after adjusting for inflation, real operating
costs across all 31 commuter rail systems from FY 2019 to FY 2023 still
increased 9 percent, as noted above.

Beyond inflation, officials from four of our selected systems cited labor
costs or the increased cost of materials, which they linked to supply chain
issues, as reasons for increased operating costs. Officials from three of

32We adjusted the NTD metrics of operating costs per passenger trip and operating costs
per passenger mile traveled for inflation because NTD only publishes nominal data.
33While the number of riders on a system can also affect the average passenger miles
traveled, the length of an overall system is an example of how operating metrics can differ
between systems due to unique characteristics of the systems.




Page 20                                             GAO-25-107511 Commuter Rail Systems
the four systems said their labor costs increased due to increases in the
price of their labor contracts. Officials from one system also said
challenges hiring workers increased their operating costs. With respect to
the increased cost of materials, officials from three systems highlighted
supply chain issues, which officials from one system said affected their
ability to get parts for repairs.

Increased labor and material costs during this time were not unique to
commuter rail systems, but rather, were experienced across the transit
industry. According to FTA and our previous work, workforce and supply
chain challenges increased costs across the transit industry during the
pandemic. 34 For example, FTA reported in August 2024 that supply chain
shortages and issues have limited the ability of transit agencies to
procure vehicles and have led to cancelled contracts, delivery delays, and
price increases of up to 70 percent. 35

Commuter rail system officials we interviewed told us that increased costs
are affecting their ability to plan and implement projects for future
operations. 36 Officials from four systems said they had to delay or modify
capital projects due to increasing costs. Such delays may be challenging
to future system operations. According to officials from one system, for
example, their system is older, and capital projects are necessary to
address the system’s infrastructure needs and continue operations. In
addition, officials from two commuter rail systems noted that their systems
are facing a funding gap. Officials from three systems also said that
funding does not go as far to cover project costs. For example, officials
from one system told us the transit agency originally had enough money
34We have previously reported on transit agency operating and capital cost increases
during the COVID-19 pandemic. See GAO, COVID-19: Federal Efforts Could Be
Strengthened by Timely and Concerted Actions, GAO-20-701 (Washington, D.C.: Sept.
21, 2020); and COVID-19: Current and Future Federal Preparedness Requires Fixes to
Improve Health Data and Address Improper Payments, GAO-22-105397 (Washington,
D.C.: Apr. 27, 2022). See also Federal Transit Administration, Effects of the COVID-19
Pandemic on Transit Ridership and Accessibility.
35Federal Transit Administration, Effects of the COVID-19 Pandemic on Transit Ridership
and Accessibility.
36We have previously reported on capital costs, including capital investment grants, and
FTA cost estimations, and we have ongoing work on capital costs. See GAO, Capital
Investment Grants Program: Cost Predictions Have Improved, but the Pandemic
Complicates Assessing Ridership Predictions, GAO-23-105479 (Washington, D.C.: Apr.
10, 2023); Capital Investment Grants Program: FTA Should Improve the Effectiveness
and Transparency of Its Reviews, GAO-20-512 (Washington, D.C.: July 16, 2020); and
Rail Transit: Federal Transit Administration Could Improve Information on Estimating
Project Costs, GAO-19-562 (Washington, D.C.: July 22, 2019).




Page 21                                            GAO-25-107511 Commuter Rail Systems
                  to build a “clean and repair” facility for 13 trains before the pandemic, but
                  with recent cost increases, can only build a facility that holds eight trains.
                  Looking ahead, if costs continue to increase while ridership recovery
                  remains uncertain, many commuter rail systems will likely face ongoing
                  challenges that require further adaptation to continue operating.

                  We provided a draft of this report to DOT for review and comment. DOT
Agency Comments   provided technical comments, which we incorporated, as appropriate.

                  We are sending copies of this report to the appropriate congressional
                  committees, the Secretary of Transportation, and other interested parties.
                  In addition, the report is available at no charge on the GAO website at
                  https://www.gao.gov.

                  If you or your staff have any questions about this report, please contact
                  me at vonaha@gao.gov. Contact points for our Offices of Congressional
                  Relations and Public Affairs may be found on the last page of this report.
                  GAO staff who made key contributions to this report are listed in appendix
                  III.




                  Andrew Von Ah
                  Director, Physical Infrastructure Issues




                  Page 22                                      GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
             Appendix I: U.S. Commuter Rail System
             Snapshots


Snapshots

             We created “snapshots” for the 31 commuter rail systems operating in the
             U.S. 1 As part of our web-based survey, we requested and analyzed data
             from each system, including fiscal year (FY) 2023 funding and cost data,
             station locations, and FY 2023 passenger boardings by station, if
             available. 2 Each snapshot includes a map showing the location of that
             system’s stations and the relative population density of its service area.
             Each snapshot also depicts the funding composition of each system in FY
             2019 and FY 2023. Transit agencies’ fiscal years may vary (e.g., some
             are from July through June, while others are from October through
             September). Finally, we also include information on passenger boardings
             from January 2019 through December 2024 for each system. To ensure
             consistency among systems, we used monthly data from the National
             Transit Database to calculate annual passenger boardings in calendar
             year 2023 for each snapshot.




             1The 31 commuter rail systems include all systems in the U.S. classified as commuter rail,
             as well as certain hybrid rail systems and two legacy Amtrak lines identified as commuter
             rail systems within the Federal Transit Administration’s National Transit Database.
             2Five systems could not provide annual passenger boardings at the station level, though
             the agencies may track boardings at other intervals (e.g., by fare zone).




             Page 23                                             GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




,,,,,,,,




Page 24                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 25                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 26                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 27                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 28                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 29                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 30                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 31                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 32                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 33                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 34                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 35                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 36                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 37                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 38                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 39                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 40                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 41                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 42                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 43                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 44                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 45                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 46                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 47                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 48                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 49                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 50                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 51                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 52                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 53                                 GAO-25-107511 Commuter Rail Systems
Appendix I: U.S. Commuter Rail System
Snapshots




Page 54                                 GAO-25-107511 Commuter Rail Systems
      Appendix II: Federal Funding Related to
                            Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




      Commuter Rail Provided Under the
      Infrastructure Investment and Jobs Act (IIJA)

                                                                                                                                                                                             Total funds
                                                                         Allowable                                                                                                       provided under
                                                 Source     Type of      project             Fiscal year       Fiscal year         Fiscal year                                            the IIJA, fiscal
Program              Description                 of funds   allocation   types                     2022              2023                2024    Fiscal year 2025     Fiscal year 2026 years 2022–2026a
Federal Highway      Funding for state and       Highway    Formula      Capital         $13,835,404,382   $14,112,112,470    $14,394,354,721    $14,682,241,816      $14,975,886,619    $72,000,000,008
Administration       local transportation        Trust
Surface              needs, including            Fund
Transportation       construction of highways,
Block Grant          bridges, and tunnels, and
Program (23 U.S.C.   transit capital projects
§ 133)b              eligible for assistance
                     under 49 U.S.C. Chapter
                     53.
Federal Transit      Funding for public         Highway     Formula      Capital,         $6,408,288,249    $6,542,164,133     $6,712,987,840        $6,851,662,142    $7,025,844,743    $33,540,947,107
Administration       transportation in          Trust                    planning, job
Urbanized Area       urbanized areas with       Fund                     access and
Formula Grants (49   populations of 50,000                               reverse
U.S.C. § 5307)c      people or more. Eligible                            commute,d
                     recipients are states and                           and operating
                     government authorities for                          expensese in
                     one or more urbanized                               urbanized
                     areas. Eligible projects                            areas of
                     include capital                                     under
                     investments in new and                              200,000
                     existing fixed guideway                             people
                     systems including rolling
                     stock, overhaul and
                     rebuilding of vehicles,
                     station infrastructure,
                     track, signals,
                     communications, and
                     computer hardware and
                     software.




                                          Page 55                                                                                GAO-25-107511 Commuter Rail Systems
                             Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                                                                                                                                                                                                 Total funds
                                                                          Allowable                                                                                                          provided under
                                                 Source     Type of       project            Fiscal year          Fiscal year          Fiscal year                                            the IIJA, fiscal
Program              Description                 of funds   allocation    types                    2022                 2023                 2024     Fiscal year 2025    Fiscal year 2026 years 2022–2026a
Federal Transit      Funding to support the       General   Competitive   Capital     $4,600,000,000       $4,600,000,000       $4,600,000,000       $4,600,000,000      $4,600,000,000    $23,000,000,000
Administration       construction of new rail,    Fund
Capital Investment   bus rapid transit, and ferry
Grant Program (49    systems, and to expand
U.S.C. § 5309)f      existing systems. States
                     and local government
                     authorities are eligible
                     recipients.
Federal Transit      Funding for maintaining     Highway Formula          Capital     $4,165,528,226       $4,237,778,037       $4,330,934,484       $4,405,675,417      $4,500,496,668    $21,640,412,832
Administration       rail, bus rapid transit,    Trust
State of Good        trolleybus, and ferry       Fund and
Repair Grant         systems, including          General
Program (49 U.S.C.   projects to replace,        Fund
§ 5337(c)-(d))g      rebuild, and rehabilitate
                     track, line equipment and
                     structures, signals and
                     communications, and
                     passenger stations and
                     terminals. Eligible
                     recipients are states and
                     local government
                     authorities in urbanized
                     areas with fixed guideway
                     and high intensity
                     motorbus systems in
                     revenue service for at
                     least seven years.




                                          Page 56                                                                                     GAO-25-107511 Commuter Rail Systems
                            Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                                                                                                                                                                                             Total funds
                                                                       Allowable                                                                                                         provided under
                                              Source      Type of      project             Fiscal year         Fiscal year         Fiscal year                                            the IIJA, fiscal
Program              Description              of funds    allocation   types                     2022                2023                2024    Fiscal year 2025     Fiscal year 2026 years 2022–2026a
Federal Highway      Funding for transportation Highway   Formula      Capital          $2,536,490,803     $2,587,220,620      $2,638,965,032        $2,691,744,332    $2,745,579,213    $13,200,000,000
Administration       projects and other         Trust                  projects that
Congestion           programs that contribute   Fund                   reduce
Mitigation and Air   to air quality                                    emissions,
Quality              improvements in                                   and certain
Improvement          nonattainment areas (i.e.,                        operating
(CMAQ) Program       areas that do not meet air                        expenses,e
(23 U.S.C. § 149)    quality standards) or                             including in
                     maintenance areas (i.e.,                          areas eligible
                     areas that were designed                          under FTA’s
                     as air quality                                    Urbanized
                     nonattainment areas but                           Area and
                     later redesignated as air                         Rural Area
                     quality attainment areas).                        programs
                     Funds are distributed to
                     states under the program.
                     States that do not have
                     nonattainment or
                     maintenance areas
                     receive a minimum
                     apportionment of funding
                     for either CMAQ eligible
                     projects or projects that
                     are eligible under the
                     Surface Transportation
                     Block Grant Program.




                                        Page 57                                                                                  GAO-25-107511 Commuter Rail Systems
                              Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                                                                                                                                                                                                      Total funds
                                                                             Allowable                                                                                                            provided under
                                                    Source     Type of       project              Fiscal year          Fiscal year          Fiscal year                                            the IIJA, fiscal
Program               Description                   of funds   allocation    types                      2022                 2023                 2024     Fiscal year 2025    Fiscal year 2026 years 2022–2026a
Department of         Funding for planning and General         Competitive   Capital       $1,500,000,000       $1,500,000,000       $1,500,000,000       $1,500,000,000      $1,500,000,000    $7,500,000,000
Transportation        constructing surface        Fund
Better Utilizing      transportation
Investments to        infrastructure projects,
Leverage              including public
Development           transportation projects,
(BUILD)               that have a significant
Discretionary Grant   impact in local and
Program (49 U.S.C.    regional communities by
§ 6702)h              improving safety,
                      environmental
                      sustainability, or mobility
                      and community
                      connectivity. Eligible
                      recipients include states,
                      local governments, Indian
                      Tribes, and transit
                      agencies.
Federal Transit       Funding for public            Highway    Formulai      Capital,       $875,289,555        $893,575,275         $916,907,591         $935,848,712        $959,639,810      $4,581,260,943
Administration        transportation in rural       Trust                    planning, job
Formula Grants for    areas with populations of     Fund                     access and
Rural Areas (49       less than 50,000 people.                               reverse
U.S.C. § 5311)c       Eligible recipients are                                commute,d
                      states and Indian Tribes,                              operating
                      and eligible subrecipients                             expenses,e
                      are state and local                                    and
                      government authorities,                                acquisition of
                      nonprofit organizations,                               public
                      and operators of public                                transportation
                      transportation or intercity                            services
                      bus service.




                                            Page 58                                                                                        GAO-25-107511 Commuter Rail Systems
                              Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                                                                                                                                                                                             Total funds
                                                                            Allowable                                                                                                    provided under
                                                  Source      Type of       project          Fiscal year         Fiscal year         Fiscal year                                          the IIJA, fiscal
Program               Description                 of funds    allocation    types                  2022                2023                2024    Fiscal year 2025   Fiscal year 2026 years 2022–2026a
Federal Transit       Funding for state and         General   Competitive   Capital        $350,000,000        $350,000,000        $350,000,000        $350,000,000      $350,000,000      $1,750,000,000
Administration All    local government              Fund
Stations              authorities to finance
Accessibility         capital projects to
Program (IIJA, Pub.   upgrade the accessibility
L. No. 117-58, 135    of legacy rail fixed
Stat. 429, 1439-40    guideway public
(2021))               transportation systems for
                      people with disabilities.
                      Funding may be used for
                      projects to repair,
                      improve, modify, retrofit,
                      or relocate infrastructure
                      of stations or facilities for
                      passenger use and to
                      develop or modify a plan
                      for pursuing public
                      transportation
                      accessibility projects.




                                            Page 59                                                                                GAO-25-107511 Commuter Rail Systems
                                     Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                                                                                                                                                                                                                    Total funds
                                                                                      Allowable                                                                                                                 provided under
                                                            Source     Type of        project                Fiscal year           Fiscal year           Fiscal year                                             the IIJA, fiscal
 Program                   Description                      of funds   allocation     types                        2022                  2023                  2024     Fiscal year 2025     Fiscal year 2026 years 2022–2026a
 Federal Transit           In addition to the formula Highway          Competitive    Capital              $300,000,000          $300,000,000          $300,000,000         $300,000,000        $300,000,000       $1,500,000,000
 Administration            program described above, Trust
 Competitive Grants        the State of Good Repair Fund
 for Rail Vehicle          Program includes a
 Replacement (49           competitive program that
 U.S.C. § 5337(f))         funds the replacement of
                           rail rolling stock,
                           consisting of revenue
                           service vehicles,
                           passenger carrying
                           vehicles, and locomotives
                           necessary for the
                           provision of rail public
                           transportation. Eligible
                           recipients are state and
                           local government
                           authorities in urbanized
                           areas that are eligible for
                           State of Good Repair
                           formula funding.
Source: GAO analysis of federal statutes. | GAO-25-107511

                                                            Note: On January 20, 2025, the Administration issued an Executive Order to pause the disbursement of certain funds appropriated through the IIJA and directed
                                                            agencies to review their processes, policies, and programs for issuing grants and other financial disbursements under the IIJA for consistency with the law and the
                                                            policy of the Executive Order. See Exec. Order 14154, Unleashing American Energy (Jan. 20, 2025). In addition to the programs described in this table, the Federal
                                                            Transit Administration’s (FTA) Emergency Relief Program may provide funding for commuter rail in response to an emergency, which includes a natural disaster
                                                            affecting a wide area (such as a flood, hurricane, tidal wave, earthquake, severe storm, or landslide) or a catastrophic failure from any external cause. Under this
                                                            program, when Congress has appropriated funding for this purpose, the FTA may make grant funding available for capital projects to protect, repair, reconstruct, or
                                                            replace equipment and facilities of a public transportation system that is in danger of suffering serious damage, or has suffered serious damage, as a result of an
                                                            emergency and for eligible operating costs of public transportation equipment and facilities in an area directly affected by an emergency.
                                                            During the COVID-19 pandemic, the CARES Act, Coronavirus Response and Relief Supplemental Appropriations Act, 2021 (CRRSAA), and American Rescue Plan Act
                                                            (ARPA) appropriated approximately $25 billion, $14 billion, and $30.5 billion, respectively, to the FTA to support the transit industry through the Urbanized Area and
                                                            Rural Area formula programs. CARES Act, Pub. L. No. 116-136, 134 Stat. 281, 599-600 (2020); CRRSAA, Pub. L. No. 116-260, 134 Stat. 1909, 1945-47 (2020);
                                                            ARPA, Pub. L. No. 117-2, 135 Stat. 4, 72-73 (2021). The CARES Act, CRRSAA, and ARPA permitted recipients of federal transit funding to use the funding for a wide
                                                            array of capital and operating expenses with no limit on the amount used for operating expenses. Some of the COVID-19 funding required that it be used for payroll and
                                                            operating expenses to the maximum extent possible. However, if the recipient certified to the FTA that the recipient had not furloughed any employees, then the
                                                            recipient was not required to prioritize payroll and operating expenses before other expenses.


                                                      Page 60                                                                                          GAO-25-107511 Commuter Rail Systems
Appendix II: Federal Funding Related to Commuter Rail Provided Under the Infrastructure Investment and Jobs Act (IIJA)




                  a
                   These amounts reflect the total funding provided under the IIJA and do not subtract administrative expenses or set asides other than the FTA Competitive Grants for
                  Rail Vehicle Replacement, which is a set aside of the State of Good Repair Formula Grants Program.
                  b
                   The amounts provided for the Surface Transportation Block Grant Program are approximately 28 percent of the amounts remaining from the base apportionment
                  amounts (as set forth in the IIJA, Pub. L. No. 117-58, § 11101, 135 Stat. 429, 443 (2021)) after subtracting the amounts provided for the Congestion Mitigation and Air
                  Quality Improvement Program, the National Highway Freight Program, and Metropolitan Planning. See 23 U.S.C. § 104(b)(2), (4)-(6), (h). The amounts listed in the
                  table have been rounded to the nearest whole dollar. The numbers reflected in the table for the Surface Transportation Block Grant Program reflect DOT’s official
                  apportionment, which is calculated and rounded first at the state level and then summed to arrive at the program total.
                  c
                    The amounts provided in the table for the Urbanized Area and Rural Area formula programs do not include apportionments based on growing states and high density
                  formula factors under 49 U.S.C. § 5340. The IIJA includes an authorization to 49 U.S.C. § 5340, which makes funds available to FTA’s Urbanized Area and Rural Area
                  formula programs. Pub. L. No. 117-58, § 30017, 135 Stat. 429, 912 (2021). The IIJA provides $392,752,680 for fiscal year 2022, $400,957,696 for fiscal year 2023,
                  $411,427,180 for fiscal year 2024, $419,926,283 for fiscal year 2025, and $430,601,628 for fiscal year 2026 for growing state apportionments under section 5340(c);
                  and $348,290,112 for fiscal year 2022, $355,566,259 for fiscal year 2023, $364,850,518 for fiscal year 2024, $372,387,459 for fiscal year 2025, and $381,854,274 for
                  fiscal year 2026 for high density state apportionments under section 5340(d). The specific growing state apportionment funding provided between these two programs
                  is unascertainable under the IIJA.
                  d
                   Job access and reverse commute projects are transportation projects to finance planning, capital, and operating costs that support the development and maintenance
                  of transportation services designed to transport welfare recipients and eligible low-income individuals to and from jobs and activities related to their employment,
                  including transportation projects that facilitate the provision of public transportation services from urbanized areas and rural areas to suburban employment locations. 49
                  U.S.C. § 5302(10).
                  e
                   Operating expenses are those costs necessary to operate, maintain, and manage a public transportation system. Operating expenses usually include such costs as
                  labor, fuel, and items having a useful life of less than one year.
                  f
                   The amounts provided for the Capital Investment Grant Program include: (1) the amounts provided in IIJA, Pub. L. No. 117-58, § 30017, 135 Stat. 429, 914 (2021); and
                  (2) the supplemental amount provided in IIJA, Pub. L. No. 117-58, 135 Stat. 429, 1438 (2021), of $8,000,000,000 for Capital Investment Grants to be distributed in
                  equal amounts for each of fiscal years 2022 through 2026.
                  g
                   The amounts provided for the State of Good Repair Grant Program include: (1) the amounts provided in IIJA, Pub. L. No. 117-58, § 30017, 135 Stat. 429, 913 (2021)
                  after subtracting the $300,000,000 per fiscal year set aside for Competitive Grants for Rail Vehicle Replacement; and (2) the supplemental amount provided in IIJA,
                  Pub. L. No. 117-58, 135 Stat. 429, 1438 (2021), of $4,750,000,000 for State of Good Repair formula grants under 49 U.S.C. § 5337(c)-(d) to be distributed in equal
                  amounts for each of fiscal years 2022 through 2026.
                  h
                   This program was formerly named Rebuilding American Infrastructure with Sustainability and Equity (RAISE) and Transportation Investment Generating Economic
                  Recovery (TIGER).
                  This program also includes Public Transportation on Indian Reservations competitive grants under 49 U.S.C. § 5311(c)(2)(A).
                  i




            Page 61                                                                                            GAO-25-107511 Commuter Rail Systems
Appendix III: GAO Contact and Staff
                          Appendix III: GAO Contact and Staff
                  Acknowledgments



Acknowledgments

                  Andrew Von Ah, vonaha@gao.gov
GAO Contact
                  In addition to the contact named above, Sarah Farkas (Assistant
Staff             Director); Melissa Greenaway (Analyst-in-Charge); Laura Bonomini;
Acknowledgments   Delwen Jones; Stephanie Lola; Dan Luo; John Mingus; Rebecca Morrow;
                  Shannon Murphy; Josh Ormond; McKenna Ventura; Erin Villareal; and
                  Elizabeth Wood made key contributions to this report.




                  Page 62                                       GAO-25-107511 Commuter Rail Systems
                      The Government Accountability Office, the audit, evaluation, and investigative
GAO’s Mission         arm of Congress, exists to support Congress in meeting its constitutional
                      responsibilities and to help improve the performance and accountability of the
                      federal government for the American people. GAO examines the use of public
                      funds; evaluates federal programs and policies; and provides analyses,
                      recommendations, and other assistance to help Congress make informed
                      oversight, policy, and funding decisions. GAO’s commitment to good government
                      is reflected in its core values of accountability, integrity, and reliability.

                      The fastest and easiest way to obtain copies of GAO documents at no cost is
Obtaining Copies of   through our website. Each weekday afternoon, GAO posts on its website newly
GAO Reports and       released reports, testimony, and correspondence. You can also subscribe to
                      GAO’s email updates to receive notification of newly posted products.
Testimony
Order by Phone        The price of each GAO publication reflects GAO’s actual cost of production and
                      distribution and depends on the number of pages in the publication and whether
                      the publication is printed in color or black and white. Pricing and ordering
                      information is posted on GAO’s website, https://www.gao.gov/ordering.htm.
                      Place orders by calling (202) 512-6000, toll free (866) 801-7077, or
                      TDD (202) 512-2537.
                      Orders may be paid for using American Express, Discover Card, MasterCard,
                      Visa, check, or money order. Call for additional information.

                      Connect with GAO on X, LinkedIn, Instagram, and YouTube.
Connect with GAO      Subscribe to our Email Updates. Listen to our Podcasts.
                      Visit GAO on the web at https://www.gao.gov.

                      Contact FraudNet:
To Report Fraud,
                      Website: https://www.gao.gov/about/what-gao-does/fraudnet
Waste, and Abuse in
                      Automated answering system: (800) 424-5454
Federal Programs
                      Sarah Kaczmarek, Managing Director, Media@gao.gov
Media Relations

                      A. Nicole Clowers, Managing Director, CongRel@gao.gov
Congressional
Relations
                      https://www.gao.gov/about/contact-us
General Inquiries




                         Please Print on Recycled Paper.


File and source

File
commuter-rail-most-systems-struggling-to-recover-gao-25-107511.pdf
Size
11,636,847 bytes
SHA-256
bb6f1abe6f78493bae47f0b8c30f9acc8d58b028772248f74f2a7cc5fd11ff0e
Our copy
commuter-rail-most-systems-struggling-to-recover-gao-25-107511.pdf
Original
www.gao.gov
Back to top