State and Local Fiscal Recovery Funds: New Obligation FAQs Webinar — May 2024

Summary

This is a U.S. Department of the Treasury slide deck titled State and Local Fiscal Recovery Funds: New Obligation FAQs Webinar, dated May 2024. The agenda covers how recipients can meet the obligation deadline of 12/31/2024, how a recipient may use funds to cover personnel costs for an employee through December 31, 2026, and how certain interagency agreements can be considered an obligation. It says Treasury issued an Interim Final Rule in 2023 to amend the definition of obligation and received over 100 comment letters. The deck lists three clarifications on interagency agreements, personnel costs, and contract cost increases, and says the deadline to report certain cost estimates was extended to 7/31/24 for quarterly reporters and 4/30/25 for annual reporters.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“State and Local Fiscal Recovery Funds: New Obligation FAQs Webinar — May 2024.” Original at home.treasury.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/department-of-the-treasury-slide-deck-home-treasury-gov-system-files-1-dd083db042/, SHA-256 961b8dfb4a89582e8e71d53caf573e0bd149d244579284175549f2aca8bd96de.

Full text

State and Local Fiscal Recovery Funds:
New Obligation FAQs Webinar


 May 2024
                                                                                   2



Today’s agenda
• Background on the new obligation FAQs, in section 17 of
  the SLFRF FAQs
• Overview of how recipients can meet the obligation
  deadline of 12/31/2024, including clarifications on the
  pathways described in the new FAQs
     • Overview of how a recipient may use funds to cover personnel
       costs for an employee through December 31, 2026
     • Overview of how certain interagency agreements can be
       considered to be an obligation
     • Overview of certain contract cost increases that may be covered
       after the obligation deadline



U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   3



Background on new obligation FAQs
• In 2023 Treasury issued an Interim Final Rule (“IFR”) to
  amend the definition of “obligation” and to provide
  additional clarification for recipients

• Treasury received over 100 comment letters on the IFR.
  Some of the primary themes were:
     • How to cover payroll costs in FY25 and FY26
     • Whether MOUs between departments counted as an obligation
     • Flexibility to cover contract cost increases

• Treasury has released FAQs to provide additional
  clarifications on these items in FAQs Section 17.
     https://home.treasury.gov/system/files/136/SLFRF-Final-Rule-FAQ.pdf
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                   4



About the new FAQs
• The new FAQs contain three important clarifications:
     1.        Treasury considers an interagency agreement to constitute an obligation if the
               agreement meets certain conditions
     2.        Treasury considers a recipient to have an incurred an obligation for personnel
               costs for an employee if the employee is serving in a position that was
               established and filled prior to the obligation deadline (12/31/24)
     3.        Treasury is clarifying how recipients may cover cost increases for contracts that
               were entered into prior to the obligation deadline, but have cost increases after
               the obligation deadline has passed.


• Treasury has also extended the deadline for recipients to report their cost
  estimates for certain legal and administrative requirements to 7/31/24 for
  quarterly reporters and 4/30/25 for annual reporters and clarified that the
  estimate is not mandatory.

• There are no changes to the obligation or expenditure deadlines.


U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                                     5



                                      Timeline for Use of SLFRF Funds

      Funds may be used for costs incurred:
1. from March 3, 2021 onward for the eligible uses
        described in the 2022 Final Rule; and
2. from December 29, 2022 onward for the eligible                                     Funds for all other eligible
     uses described in the 2023 Interim Final Rule                                    uses must be expended by
                                                                                         December 31, 2026


                                                        We
                                                        are
                                                        here




                                                                                    Funds for Title I projects and
                                                  Funds must be                    Surface Transportation projects
                                                   obligated by                         must be expended by
                                                December 31, 2024                       September 30, 2026



U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   6




       Section 1: Obligation Definition




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   7



What is an obligation?
• Treasury implemented the statutory requirement that SLFRF
  funds may only be used to cover costs incurred by December
  31, 2024, by providing that a cost is considered incurred if a
  recipient has incurred an obligation by December 31, 2024.
• Treasury defined “obligation” as “an order placed for property
  and services and entering into contracts, subawards, and
  similar transactions that require payment.”
• The Obligation IFR amended the definition of “obligation” and
  provided additional guidance.
• In section 17 of the SLFRF FAQs, Treasury has provided further
  guidance and clarification about what constitutes an
  obligation.
     • Similar transactions that require payment include certain
       interagency agreements (17.6) and payroll expenses (17.7)
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   8



What is an obligation?
An obligation is:
1. An order placed for property and services and entry into
   contracts, subawards, and similar transactions that require
   payment, which may include:
           o    An order placed for property or services
           o    Contract
           o    Subaward
           o    Similar transactions that require payment, which may include:
               ▪ Certain interagency agreements (including MOUs) (see FAQ 17.6)
               ▪ Under certain circumstances, payroll expenses for recipients’
                  employees (see FAQ 17.7)
2. A requirement under federal law or regulation or a
   provision of the SLFRF award terms and conditions to which
   the recipient becomes subject as a result of receiving or
   expending SLFRF funds.
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   9



An obligation is NOT:
•     An adopted budget or budget amendment
•     An appropriation of SLFRF funds
•     An executive order
•     A resolution
•     A written or oral intention to enter into a contract
•     A grant of legal authority to enter into a contract
•     Claiming funds under the revenue loss category
•     Moving SLFRF funds to a general fund as revenue loss but not
      further establishing an obligation with those funds by
      12/31/24




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                                10



Case Study #1: Are budgets an obligation?

                                     → Case example: A city council has passed its FY24 budget,
                                       which outlines exactly how SLFRF funds are to be used.
                                     → Question: Has the city obligated its SLFRF funds?
                                     → Response: No. A budget and/or appropriation authority for
                                       SLFRF funds is not considered an obligation. The city will need
                                       to obligate its funds through at least one of the mechanisms
                                       outlined on slide 8/below and report the project(s) in their
Definition                             Project and Expenditure report due January 31, 2025
    of                                 (quarterly reporters) or April 30, 2025 (annual reporters).
Obligation                                    → An order placed for property or services
                                              → Contract
                                              → Subaward
                                              → Transactions similar to contracts and subawards that require
                                                payment, such as:
                                                  → Interagency agreements (see FAQ 17.6)
                                                  → Personnel costs (see FAQ 17.7)
                                              → Compliance with certain administrative and legal requirements
                                                of the SLFRF program (see FAQ 17.10)

U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   11



Do subrecipients have an obligation deadline?
• No. See FAQ 17.18.
• The obligation deadline applies to the recipient of SLFRF
  funds. A cost is considered to have been incurred once a
  recipient enters into a subaward that obligates the recipient
  to cover that cost.
• Subrecipients are not subject to the December 31, 2024,
  obligation deadline.
• Subrecipients and contractors do not need to take additional
  steps to obligate funds after entering into a subaward or
  contract with the recipient.



U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   12



Aren’t revenue loss funds automatically obligated?
• NO. See FAQ 17.15.
• All SLFRF funds under any eligible use category are subject to the
  obligation requirements – including funds used under the revenue loss
  category.
• This means that, when a recipient uses funds to provide government
  services, those funds must be obligated via one of the pathways
  discussed on slide 7.
• If a recipient is utilizing revenue loss to pay for government services,
  the recipient must report the use as project(s) under expenditure
  category 6.1.
• Recipients must enter a project description for any project entered
  under 6.1. Revenue loss project descriptions must summarize the
  project in sufficient detail to provide an understanding of the major
  activities that will occur. Descriptions should establish what the project
  seeks to accomplish and should include enough information to make
  clear how the recipient determined the project’s eligibility.

U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   13




                 Section 2: Payroll Expenses




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   14



Personnel costs in 2025 and 2026
 • Treasury will consider a recipient to have incurred an obligation to use
   funds to cover personnel costs for an employee through December 31,
   2026, if the employee is serving in a position that was established and
   filled prior to December 31, 2024.

 • Personnel costs must be expended in connection with an eligible use of
   SLFRF. Examples:
      • State employees developing broadband projects
      • County employees overseeing contracts to build affordable housing

 • Eligible personnel costs include:
      • All salaries and wages
      • Covered benefits (including leave, insurance, and retirement expenses)
      • Payroll taxes


 • See FAQ 17.7 for more information.
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                       15

Can a recipient replace or rearrange personnel after the
obligation deadline?

     • Yes. If the position was established and filled by December
       31, 2024, a recipient may replace the employee in that
       position. The replacement does not need to be immediate.

     • Recipients may also reorganize positions within the scope of
       an eligible SLFRF project after December 31, 2024.
           • Example: if an eligible project employs ten job training specialists on
             December 31, 2024, it is permissible for the recipient to use funds to
             cover payroll for one of those training specialists who is promoted to
             be a supervisor, so long as there are no more than ten positions
             covered through SLFRF funds in total.

     • Recipients may not use funds to cover any new positions
       created after December 31, 2024.
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                      16



Case Study #2: Payroll costs increase after obligation deadline
                                     → Case example: A recipient submitted a report to Treasury
                                       estimating $100,000 in SLFRF payroll costs in 2025 and 2026.
                                       However, in 2025, due to a new collective bargaining
                                       agreement, staff costs have unexpectedly increased. The
                                       recipient would like to consider an additional $50,000 in
                                       SLFRF funds obligated for payroll costs.
                                     → Question: Can the recipient increase its estimated payroll
                                       obligation to $150,000? If so, how?
     Payroll
                                     → Response: Yes. Eligible personnel costs for employees in
    Increase
                                       positions created and filled by December 31, 2024, are
                                       considered obligated, and that amount may be adjusted
                                       based on compensation in effect at the time of payment. A
                                       recipient may raise the salaries of employees in those
                                       positions. However, a recipient may not create new positions
                                       for the project after the obligation deadline. Treasury will
                                       update the Compliance and Reporting Guidance with
                                       additional information about how to report these funds.
                                     → Relevant FAQs: 17.7 and 17.8
U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                         17



Case Study #3: Payroll costs are lower than estimated

                                     → Case example: A recipient submitted a report to Treasury
                                       estimating $5 million in SLFRF payroll costs in 2025 and 2026.
                                       However, due to the completion of a project ahead of
                                       schedule, only $4 million is needed for payroll expenses in
                                       those years.
                                     → Question: Can the recipient use the unexpended $1 million
                                       attributable to the estimate for another project?
    Over-
                                     → Response: Yes. The recipient may expend the $1 million for
 estimating
                                       another eligible use of SLFRF funds. That eligible use must
    Costs                              meet all the requirements of SLFRF, including the requirement
                                       that the recipient incur an obligation for that project by
                                       December 31, 2024. For example, the recipient could apply
                                       those funds to a project for which the recipient entered into a
                                       contract by December 31, 2024 and for which the recipient
                                       originally used local funds.
                                     → Relevant FAQs: 17.8 and 17.19


U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   18




           Section 3: Estimated Expenses




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                             19



When would a recipient submit cost estimate(s) to Treasury?

•     There are three separate kinds of estimates, which are for:
     •      payroll costs to be expended in 2025 and 2026.
     •      certain administrative and legal costs to be expended in 2025 and 2026 (or for
            award closeout).
     •      costs to cover contract change orders and contingencies.

• Recipients are not required to report an estimate of these expenses. But
  they may benefit from doing so if:
     • They plan to use SLFRF funds for such costs, and want to ensure that those
       funds are not returned to Treasury as unobligated, AND
     • Those funds are not reported to Treasury as obligated through another project
       (such as a contract or interagency agreement).

•     Estimates submitted to Treasury prior to the obligation deadline will
      ensure that those funds are treated as obligated. Therefore, the recipient
      will be able to spend SLFRF funds on the relevant expenses in 2025 and
      2026.


U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                      20


What legal and administrative costs are eligible for purposes of this
provision?
• As explained in the Obligation IFR and our previous webinar, certain legal and
  administrative costs are considered obligated as a result of receiving or
  expending SLFRF funds.

• These include:
     •     Reporting and compliance requirements, including subrecipient monitoring
     •     Single Audit costs;
     •     Record retention and internal control requirements;
     •     Property standards;
     •     Environmental requirements; and
     •     Civil rights and nondiscrimination requirements.

• If these costs are not reported as obligated through another project, recipients
  can submit to Treasury an estimate of those anticipated costs to ensure that
  the funds can be retained after the obligation deadline and used for those
  purposes in 2025 and 2026.

• See FAQs 17.10 through 17.13 for more information.


U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                                      21



Summary of Estimate Options
               Personnel Cost Estimate                                              Admin & Legal Cost Estimate
BOTH: Not mandatory. Option is available to ensure funds are treated as obligated.
Submission deadline:                                                          Submission deadline:
• 1/31/2025 (quarterly reporters)                                             • 7/31/2024 (quarterly reporters)
• 4/30/2025 (annual reporters)                                                • 4/30/2025 (annual reporters)
                                                                                (extension from previous deadline)
BOTH: Requires reasonable justification for estimate(s) and report to Treasury.
BOTH: No penalty for inaccurate estimate(s) if the initial estimate(s) were reasonable.
• If actual expenses are greater than amount estimated, recipient can reclassify
  funds from other SLFRF projects, use program income, or use non-SLFRF sources, to
  pay for those expenses.
• If actual expenses are lower than the amount estimated, recipients can reclassify
  funds to other eligible uses of SLFRF funds obligated before December 31, 2024.
Explanation: FAQs 17.7, 17.8                                                  Explanation: FAQs 17.11, 17.12, 17.13

Note: see FAQ 17.16 for explanation of estimates for costs to cover contract change orders and contingencies.


U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                      22



Case Study #4: Estimating certain legal & administrative costs

                                     → Case example: A recipient plans to hire an independent
                                       auditor to conduct a Single Audit that will include SLFRF
                                       funds. The Single Audit will be conducted in 2025 and the
                                       recipient has not yet selected an independent auditor.
                                     → Question: Can the recipient use SLFRF funds to pay this
                                       independent auditor?
                                     → Response: Yes. Single Audit costs are considered obligated
   Legal &                             because they stem from a federal requirement which the
 Admin Cost                            recipient became subject to as a result of receiving SLFRF
  Estimate                             funds. The recipient should (1) determine the amount of
                                       SLFRF funds the recipient estimates it will use for these
                                       expenses, (2) document a reasonable justification for this
                                       estimate, (3) report that amount to Treasury with an
                                       explanation of how the amount was determined, and (4)
                                       report at award closeout the final amount expended for these
                                       costs.
                                     → Relevant FAQs: 17.10 through 17.13

U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   23




Section 4: Interagency Agreements




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                                                    24



Does an interagency agreement (IAA) count as an obligation?

• Yes, if it meets certain conditions.
• An interagency agreement finalized by 12/31/2024 can be used to obligate funds
  that a government agency will expend in 2025 and 2026.
• Eligible agreements include memoranda of understanding (MOU) or agreement
  (MOA). The agreement must meet these conditions:

   ONE requirement from Column A:                                                  ALL requirements from Column B:
   Imposes conditions on the use of funds by                                       Has specific requirements (e.g., scope of
   recipient agency, department, or part of                                        work)
   government
   Governs provision of funds from one agency,  Is signed by the parties or evidences assent of
   department, or part of government to another parties
   Governs the procurement of goods or services                                    Does not disclaim binding effect or state that
                                                                                   it doesn’t create rights or obligations

• See FAQ 17.6 for more information.



U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                  25



Case Study #5: Who can an interagency agreement be between?

                                     → Case example: A county commissioner has authority
                                       over the disposition of federal financial assistance
                                       available to the county. The commissioner wants to
                                       create an MOU between her office and the county’s
                                       Department of Education for local community colleges
                                       to provide pre-apprenticeship training for local workers
 Parties to                            disproportionately impacted by the COVID-19
Interagency                            pandemic.
Agreement                            → Question: Would this MOU constitute an obligation?
                                     → Response: Yes, if the MOU meets the conditions
                                       outlined in FAQ 17.6 and explained on the prior slide.
                                     → Relevant FAQ: 17.6




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                        26



Case Study #6: Can an existing MOU be used to obligate SLFRF funds?

                                     → Case example: A county board has an existing MOU in place
                                       to provide social services to several cities within its
                                       jurisdiction using SLFRF funds. The MOU has a clear scope of
                                       work and creates clear obligations for those cities.
                                     → Question: Does the existing MOU permit the county to report
                                       the funds for the project as obligated so that SLFRF funds may
                                       be used to cover program costs expended in 2025 and 2026?
    Existing                         → Response: Yes, so long as the MOU meets the requirements
     MOU                               previously listed, was entered into on or after March 3, 2021,
                                       and the services are SLFRF-eligible expenses. It may also be
                                       possible to modify the MOU before the obligation deadline to
                                       meet the necessary requirements.
                                     → Relevant FAQ: 17.6




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   27




         Section 5: Modifying Contracts




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
  What Flexibilities Exist for Contracts after the Obligation                                                              28

  Deadline has Passed?
   Change orders for an existing contract
          –     Recipients can fund change orders—including cost adjustments—with SLFRF if the contract or
                agreement includes a provision allowing for the change order in question. A recipient can also fund a
                cost increase with SLFRF if the cost increase is permitted under a contingency clause in the contract or
                agreement. See FAQ 17.16.
   Amend an existing contract
          –     Recipients may amend existing contracts after the obligation deadline, so long as the amended contract
                is within substantially the same scope and for substantially the same purpose as the original contract. If
                those requirements are met, SLFRF funds may be used to cover cost increases contained in the
                amended contract. See FAQ 17.16.
   Replace an existing contract
          –  As explained in the obligation IFR, recipients may replace a contract after the obligation deadline under
             one of three circumstances:
           1. Contract terminated due to business default, closure, or inability to perform
           2. Mutual agreement to terminate
           3. Recipient termination for convenience when contract was not properly awarded
          – The Replacement contract must be within substantially the same scope and for substantially the same
             purpose as the original contract. See FAQ 17.17. In that case, recipients may use SLFRF funds to cover
             increased costs of the replacement contract or subaward.


Recipients may reclassify funds from another SLFRF project to pay for any such modifications. See FAQ
17.19. Recipients will also be able to submit an estimated cost for change orders before the obligation
deadline is met. Additional information on submitting estimates will be provided in future webinars
and reporting guidance.

  U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
Summary of Contract Flexibilities                                                                                             29


                       Why would a recipient                    When can a recipient use
                            use this?                                   this?                           Restrictions
Change order
             Cost increase or other
      or                                                       Contract expressly             Only restrictions in contract
             reason anticipated in
 contingency                                                   provides for the option.       and Uniform Guidance.
             contract.


                                                                                              Amended contract must be
                       Recipient wants to                      Whenever the contract
   Amend                                                                                      within substantially the same
                       retain same contractor,                 permits, including after the
  contract                                                                                    scope and for substantially the
                       but needs to make                       obligation deadline has
                                                                                              same purpose as the original
                       unanticipated changes.                  passed.
                                                                                              contract.



                                                               One of three
                                                                                              Replacement contract must be
                                                               circumstances in
                       Recipient wants to                                                     within substantially the same
  Replace                                                      Obligation IFR (including
                       terminate contract and                                                 scope and for substantially the
  contract                                                     mutual agreement to
                       use a new contractor.                                                  same purpose as the original
                                                               terminate for
                                                                                              contract.
                                                               convenience).



  U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                          30



Case Study #7: Can SLFRF be used to fund change orders?

                                     → Case example: A city is using $1 million in SLFRF funds to build
                                       affordable housing in 2025 and 2026. However, in 2025 its
                                       discovered that the project needs to be updated via change
                                       order and the total cost is now $1.5 million.
                                     → Question: Can the city use SLFRF funds to cover the cost of
                                       the change order?
                                     → Response: Change orders and contingencies are allowed IF
     Change                            they were contemplated in the original contract. In this case,
     Orders                            the City’s contract included standard change order processes
                                       and language and thus they may use SLFRF funds for the
                                       increased cost.
                                     → Consideration: Do your contracts speak to the possibility of a
                                       change order? There is still time to update them ahead of the
                                       obligation deadline.
                                     → Relevant FAQ: 17.16



U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                        31



Case Study #8: Contractor Issue

                                     → Case Example: A recipient has awarded a contract for a capital
                                       expenditure. In March 2025, the contractor ceases business
                                       unexpectedly. The project is only 50% completed. The
                                       recipient wants to enter into a new contract with a different
                                       contractor to complete the project.
                                     → Question: Can the recipient enter into a new contract after
                                       the obligation deadline with a new contractor to complete
Replacement                            this project?
 of Contracts                        → Response: Yes, so long as the new contract is within
or Subawards                           substantially the same scope and for substantially the same
                                       purpose as the original contract.
                                     → Relevant FAQ: 17.17




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                   32




                                           Section 6: Q&A




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                  33



Recap
•     Treasury has released FAQs to provide additional clarifications on how to
      meet the obligation deadline of December 31, 2024. These FAQs explain:
           •      That Treasury considers an interagency agreement to constitute an
                  obligation if the agreement meets certain conditions
           •      That Treasury considers a recipient to have an incurred an obligation for
                  personnel costs for an employee if the employee is serving in a position that
                  was established and filled prior to the obligation deadline (12/31/24)
           •      How recipients may cover cost increases for contracts that were entered
                  into prior to the obligation deadline, but have cost increases after the
                  obligation deadline has passed.

•     Treasury has also extended the deadline for recipients to report their cost
      estimates for certain legal and administrative requirements to 7/31/24 for
      quarterly reporters and 4/30/25 for annual reporters.
•     These FAQs can be found in the SLFRF FAQs in the new Section 17.
     https://home.treasury.gov/system/files/136/SLFRF-Final-Rule-FAQ.pdf




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds
                                                                                                                                   34




                                                                                   For More Information about SLFRF:
                                                                                   Please visit Treasury’s State & Local website
                                                                                   at www.treasury.gov/SLFRF

Thank you.                                                                         For Media Inquiries:
                                                                                   Please contact the U.S. Treasury Press Office
                                                                                   at (202) 622-2960


                                                                                   For General Inquiries:
                                                                                   Please email SLFRF@treasury.gov




U.S. Department of the Treasury, Coronavirus State & Local Fiscal Recovery Funds


File and source

File
department-of-the-treasury-slide-deck-home-treasury-gov-system-files-136-obligation-webinar-deck-v1-b576ac3a8e.pdf
Size
524,086 bytes
SHA-256
961b8dfb4a89582e8e71d53caf573e0bd149d244579284175549f2aca8bd96de
Our copy
department-of-the-treasury-slide-deck-home-treasury-gov-system-files-136-obligation-webinar-deck-v1-b576ac3a8e.pdf
Original
home.treasury.gov
Back to top