Pandemic Darlings The pandemic economy, in original documents
Home Source documents Energy and Water Development Appropriations Bill, 2022

Energy and Water Development Appropriations Bill, 2022

Summary

This is Senate Report 117-36 of the 117th Congress, 1st Session, Calendar No. 115, titled Energy and Water Development Appropriations Bill, 2022, from the Committee on Appropriations, ordered to be printed August 4, 2021. Mrs. Feinstein reports on S. 2605, making appropriations for energy and water development and related agencies for the fiscal year ending September 30, 2022, and recommends that the bill do pass. The report lists a total of the bill as reported to the Senate of $56,865,791,000 in new obligational authority, compared with $49,524,875,000 in 2021 appropriations. The contents list titles for the Department of Defense-Civil, the Department of the Interior, and the Department of Energy.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Crpt Crpt 117Srpt36 Crpt 117Srpt36
Case
Crpt Crpt 117Srpt36 Crpt 117Srpt36

Cite this document

“Energy and Water Development Appropriations Bill, 2022.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/crpt-crpt-117srpt36-crpt-117srpt36/, SHA-256 50db7f71059e08d00265fe9809ca03226f6d6291b1f4c38522281a8ab3a86369.

Full text

                                                                                                                                               Calendar No. 115
                                                                              117TH CONGRESS                                                                     REPORT
                                                                                             "                             SENATE                         !
                                                                                 1st Session                                                                     117–36




                                                                                   ENERGY AND WATER DEVELOPMENT APPROPRIATIONS
                                                                                                     BILL, 2022




                                                                                                           AUGUST 4, 2021.—Ordered to be printed



                                                                              Mrs. FEINSTEIN, from the Committee on Appropriations, submitted
                                                                                                        the following


                                                                                                                        REPORT
                                                                                                                   [To accompany S. 2605]

                                                                                The Committee on Appropriations reports the bill (S. 2605) mak-
                                                                              ing appropriations for energy and water development and related
                                                                              agencies for the fiscal year ending September 30, 2022, and for
                                                                              other purposes, reports favorably thereon and recommends that the
                                                                              bill do pass.
                                                                                                    New obligational authority
                                                                              Total of bill as reported to the Senate .................... $56,865,791,000
                                                                              Amount of 2021 appropriations ............................... 49,524,875,000
                                                                              Amount of 2021 budget estimate ............................ 55,472,849,000
                                                                              Bill as recommended to Senate compared to—
                                                                                   2021 appropriations .......................................... ∂7,340,916,000
                                                                                   2022 budget estimate ........................................ ∂1,392,942,000




amozie on DSK123TN23PROD with REPORTS
                                                                                   45–272 PDF




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000    Frm 00001   Fmt 6659   Sfmt 6664   U:\SR036.XXX   SR036
                                                                                                                               CONTENTS

                                                                                                                                                                                                              Page
                                                                              Purpose .....................................................................................................................     4
                                                                              Summary of Estimates and Recommendations .....................................................                                    4
                                                                              Introduction ..............................................................................................................       4
                                                                              Title I:
                                                                                   Department of Defense—Civil: Department of the Army:
                                                                                        Corps of Engineers—Civil:
                                                                                             Investigations .....................................................................................              11
                                                                                             Construction .......................................................................................              20
                                                                                             Mississippi River and Tributaries ....................................................                            30
                                                                                             Operation and Maintenance ..............................................................                          32
                                                                                             Regulatory Program ...........................................................................                    54
                                                                                             Formerly Utilized Sites Remedial Action Program .........................                                         54
                                                                                             Flood Control and Coastal Emergencies ..........................................                                  54
                                                                                             Expenses .............................................................................................            54
                                                                                             Office of the Assistant Secretary of the Army (Civil Works) ..........                                            55
                                                                                             Water Infrastructure Finance and Innovation Program .................                                             55
                                                                                        General Provisions—Corps of Engineers—Civil .....................................                                      56
                                                                              Title II:
                                                                                   Department of the Interior:
                                                                                        Central Utah Project Completion Account ..............................................                                 57
                                                                                        Bureau of Reclamation:
                                                                                             Water and Related Resources ...........................................................                           58
                                                                                             Central Valley Project Restoration Fund .........................................                                 68
                                                                                             Gross Appropriation ...........................................................................                   68
                                                                                             California Bay-Delta Restoration ......................................................                           68
                                                                                             Policy and Administration .................................................................                       69
                                                                                        General Provisions—Department of the Interior ....................................                                     69
                                                                              Title III:
                                                                                   Department of Energy:
                                                                                        Energy Efficiency and Renewable Energy ...............................................                                 75
                                                                                        Sustainable Transportation ......................................................................                      77
                                                                                        Renewable Energy .....................................................................................                 81
                                                                                        Corporate Support .....................................................................................                90
                                                                                        Cybersecurity, Energy Security, and Emergency Response ..................                                              91
                                                                                        Energy Delivery Grid Operations Technology ........................................                                    94
                                                                                        Nuclear Energy ..........................................................................................              97
                                                                                        Naval Petroleum and Oil Shale Reserves ...............................................                                108
                                                                                        Strategic Petroleum Reserve ....................................................................                      108
                                                                                        SPR Petroleum Account ............................................................................                    108
                                                                                        Northeast Home Heating Oil Reserve .....................................................                              108
                                                                                        Energy Information Administration ........................................................                            108
                                                                                        Non-Defense Environmental Cleanup .....................................................                               108
                                                                                        Science ........................................................................................................      109
                                                                                        Advanced Research Projects Agency—Energy ........................................                                     116
                                                                                        Innovative Technology Loan Guarantee Program ..................................                                       117
                                                                                        Advanced Technology Vehicles Manufacturing Loan Program .............                                                 117
                                                                                        Tribal Energy Loan Guarantee Program ................................................                                 118
                                                                                        Office of Indian Energy Policy and Programs .........................................                                 118
                                                                                        Departmental Administration ..................................................................                        119
                                                                                        Office of the Inspector General ................................................................                      120
                                                                                        Weapons Activities ....................................................................................               120
                                                                                        Defense Nuclear Nonproliferation ...........................................................                          122
                                                                                        Naval Reactors ..........................................................................................             123
                                                                                        Federal Salaries and Expenses ................................................................                        123




amozie on DSK123TN23PROD with REPORTS
                                                                                                                                               (2)




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272      PO 00000        Frm 00002       Fmt 5905      Sfmt 5905       U:\SR036.XXX         SR036
                                                                                                                                               3
                                                                                                                                                                                                             Page
                                                                              Title III—Continued
                                                                                   Department of Energy—Continued
                                                                                        Defense Environmental Cleanup .............................................................                          123
                                                                                        Defense Uranium Enrichment Decontamination and Decommis-
                                                                                          sioning ....................................................................................................       124
                                                                                        Other Defense Activities ...........................................................................                 125
                                                                                        Power Marketing Administrations:
                                                                                            Operations and Maintenance, Southeastern Power Administra-
                                                                                              tion ...................................................................................................       125
                                                                                            Operations and Maintenance, Southwestern Power Administra-
                                                                                              tion ...................................................................................................       125
                                                                                            Construction, Rehabilitation, Operations and Maintenance, West-
                                                                                              ern Area Power Administration ....................................................                             125
                                                                                            Falcon and Amistad Operating and Maintenance Fund .................                                              125
                                                                                        Federal Energy Regulatory Commission .................................................                               126
                                                                                        General Provisions—Department of Energy ...........................................                                  154
                                                                              Title IV:
                                                                                   Independent Agencies:
                                                                                        Appalachian Regional Commission ..........................................................                           155
                                                                                        Defense Nuclear Facilities Safety Board .................................................                            155
                                                                                        Delta Regional Authority ..........................................................................                  156
                                                                                        Denali Commission ...................................................................................                156
                                                                                        Northern Border Regional Commission ...................................................                              156
                                                                                        Southeast Crescent Regional Commission ..............................................                                156
                                                                                        Southwest Border Regional Commission .................................................                               157
                                                                                        Nuclear Regulatory Commission ..............................................................                         157
                                                                                            Office of Inspector General ................................................................                     158
                                                                                        Nuclear Waste Technical Review Board ..................................................                              159
                                                                                   General Provisions ...........................................................................................            159
                                                                              Title V: General Provisions .....................................................................................              160
                                                                              Compliance With Paragraph 7, Rule XVI, of the Standing Rules of the
                                                                                Senate ...................................................................................................................   161
                                                                              Compliance With Paragraph 7(c), Rule XXVI, of the Standing Rules of the
                                                                                Senate ...................................................................................................................   162
                                                                              Compliance With Paragraph 12, Rule XXVI, of the Standing Rules of the
                                                                                Senate ...................................................................................................................   162
                                                                              Budgetary Impact of Bill .........................................................................................             165
                                                                              Disclosure of Congressionally Directed Spending Item ........................................                                  166
                                                                              Comparative Statement of Budget Authority ........................................................                             176




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272      PO 00000       Frm 00003       Fmt 5905       Sfmt 5905      U:\SR036.XXX         SR036
                                                                                                                                  4

                                                                                                                         PURPOSE
                                                                                The purpose of this bill is to provide appropriations for fiscal
                                                                              year 2022, beginning October 1, 2021 and ending September 30,
                                                                              2022, for energy and water development, and for other related pur-
                                                                              poses. It supplies funds for water resources development programs
                                                                              and related activities of the Corps of Engineers’ civil works pro-
                                                                              gram in title I; for the Department of the Interior’s Bureau of Rec-
                                                                              lamation and Central Utah Project in title II; for the Department
                                                                              of Energy’s energy research and development activities, including
                                                                              environmental restoration and waste management, and the atomic
                                                                              energy defense activities of the National Nuclear Security Adminis-
                                                                              tration in title III; and for independent agencies and commissions,
                                                                              including the Appalachian Regional Commission, Delta Regional
                                                                              Authority, Denali Commission, Northern Border Regional Commis-
                                                                              sion, and the Nuclear Regulatory Commission in title IV.
                                                                                     SUMMARY OF ESTIMATES AND RECOMMENDATIONS
                                                                                The fiscal year 2022 budget estimates for the bill total
                                                                              $53,624,824,000 in new budget (obligational) authority. The rec-
                                                                              ommendation of the Committee totals $53,625,000,000. This is
                                                                              $176,000 above the budget estimates and $1,873,000,000 above the
                                                                              enacted appropriation for the prior fiscal year. The bill also rec-
                                                                              ommends $450,000,000 in emergency appropriations.
                                                                                                             SUBCOMMITTEE HEARINGS
                                                                                To develop this recommendation, the Committee held two budget
                                                                              hearings in June 2021 in connection with the fiscal year 2022
                                                                              budget requests. The hearings provided officials from the agencies
                                                                              with an opportunity to present the administration’s most pressing
                                                                              priorities to the Committee.
                                                                                                                   INTRODUCTION
                                                                                 The Committee’s recommendation includes funding for the high-
                                                                              est priority activities across the agencies funded in the bill. The
                                                                              recommendation includes funds for critical water infrastructure, in-
                                                                              cluding our Nation’s inland waterways, ports, and harbors; agricul-
                                                                              tural water supply and drought relief in the West; groundbreaking
                                                                              scientific research and development, including world-class super-
                                                                              computing; support for the Nation’s nuclear weapons, non-prolifera-
                                                                              tion, and nuclear Navy programs; and critical economic develop-
                                                                              ment.




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00004   Fmt 6602   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                          TITLE I
                                                                                                           CORPS OF ENGINEERS–CIVIL
                                                                                                           DEPARTMENT OF THE ARMY
                                                                                                            CORPS OF ENGINEERS—CIVIL
                                                                                                           OVERVIEW OF RECOMMENDATION

                                                                                The Committee recommends $8,700,000,000 for the Corps of En-
                                                                              gineers [Corps]. The Committee’s recommendation sets priorities by
                                                                              supporting our Nation’s water infrastructure. Specifically, for the
                                                                              eighth consecutive year, the Committee recommendation provides
                                                                              adequate appropriations to utilize all of the estimated fiscal year
                                                                              2022 revenues from the Inland Waterways Trust Fund [IWTF].
                                                                                                                       INTRODUCTION

                                                                                The Corps’ Civil Works mission is to provide quality, responsive
                                                                              engineering services to the Nation in peace and war. Approxi-
                                                                              mately 23,000 civilians and about 290 military officers are respon-
                                                                              sible for executing the Civil Works mission. This bill only funds the
                                                                              Civil Works functions of the Corps.
                                                                                The Corps maintains our inland waterways, keeps our ports
                                                                              open, manages a portion of our drinking water supply, provides
                                                                              emission-free electricity from dams, restores aquatic ecosystems,
                                                                              looks after many of our recreational waters, helps manage the river
                                                                              levels during flooding, provides environmental stewardship, and
                                                                              provides emergency response to natural disasters. The annual net
                                                                              economic benefit generated by the Corps’ civil works mission is es-
                                                                              timated to be $89,000,000,000, which equates to a return of about
                                                                              $12.00 for every $1.00 expended.
                                                                                The Corps’ responsibilities include:
                                                                                —Navigation systems, including 13,000 miles of coastal naviga-
                                                                                   tion channels, 12,000 miles of inland waterways, 239 lock
                                                                                   chambers, and 1,067 harbors, which handle over 2.4 billion
                                                                                   tons of cargo annually;
                                                                                —Flood risk management infrastructure, including 718 dams,
                                                                                   12,400 miles of levees, and multiple hurricane and storm dam-
                                                                                   age risk reduction projects along the coast;
                                                                                —Municipal and industrial water supply storage at 136 projects
                                                                                   spread across 25 States;
                                                                                —Environmental stewardship, infrastructure, and ecosystem res-
                                                                                   toration;
                                                                                —Recreation for approximately 262 million recreation visits per
                                                                                   year to Corps projects;
                                                                                —Regulation of waters under Federal statutes; and
                                                                                —Maintaining hydropower capacity of nearly 24,000 megawatts
                                                                                   at 75 projects.




amozie on DSK123TN23PROD with REPORTS
                                                                                                                                  (5)




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00005   Fmt 6604     Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                  6

                                                                                                           BUDGET STRUCTURE CHANGES

                                                                                The fiscal year 2022 budget request for the Corps proposed nu-
                                                                              merous structural changes, including the creation of two new ac-
                                                                              counts—Harbor Maintenance Trust Fund [HMTF] and IWTF; the
                                                                              shifting of various studies and projects between accounts and busi-
                                                                              ness lines; and the consolidation of certain line items. The Com-
                                                                              mittee rejects all such proposed changes and instead recommends
                                                                              funding for the requested studies and projects in the manner in
                                                                              which funding has traditionally been provided. Unless expressly
                                                                              noted, the Committee recommends studies and projects remain at
                                                                              the funding levels included in the budget request, but in different
                                                                              accounts than in the budget request. In particular:
                                                                                —Projects requested in the HMTF account are shown in the Con-
                                                                                   struction, Mississippi River and Tributaries, or Operation and
                                                                                   Maintenance accounts, as appropriate;
                                                                                —Sand mitigation projects requested in the HMTF account are
                                                                                   shown in the Construction account;
                                                                                —Interagency and International Support activities is not consoli-
                                                                                   dated within the Coordination with Other Water Resource
                                                                                   Agencies remaining item in Investigations;
                                                                                —Disposition studies will continue to be funded under the re-
                                                                                   maining item line Disposition of Completed Projects in the In-
                                                                                   vestigations account;
                                                                                —Tribal Partnership projects will continue to be funded under
                                                                                   the Tribal Partnership Program remaining item line in the In-
                                                                                   vestigations account as well as in the remaining line item in
                                                                                   the Construction account, and these amounts may also be used
                                                                                   to cover necessary administrative expenses prior to agreement
                                                                                   execution;
                                                                                —Inspection of Completed Works, Project Condition Surveys, and
                                                                                   Scheduling of Reservoir Operations will continue to be funded
                                                                                   under States instead of consolidated into a national program as
                                                                                   requested in the Operation and Maintenance account and the
                                                                                   HMTF account; and
                                                                                —Inspection of Completed Works will continue to be funded
                                                                                   under the individual States instead of consolidated into a na-
                                                                                   tional program as requested in the Mississippi River and Trib-
                                                                                   utaries account.
                                                                                If the Corps proposes budget structure changes in future fiscal
                                                                              years, the proposal shall be accompanied by a display of the fund-
                                                                              ing request in the traditional budget structure.
                                                                                                  CONTINUING RESOLUTION APPORTIONMENT

                                                                                 For the purposes of continuing resolutions starting in fiscal year
                                                                              2018, the Office of Management and Budget changed the long-
                                                                              standing policy by which funding is apportioned to the Civil Works
                                                                              program of the Corps. Under the new policy, funding within an in-
                                                                              dividual account was apportioned separately for amounts from the
                                                                              general fund of the Treasury and from various trust funds. The
                                                                              Committee has long intended the Corps to have the flexibility to
                                                                              address projects most in need of funding under a continuing resolu-
                                                                              tion. The creation of artificial accounting distinctions has the po-




amozie on DSK123TN23PROD with REPORTS
                                                                              tential to cause serious impediments to the efficient and effective




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00006   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                  7

                                                                              implementation of the Civil Works program. For example, work on
                                                                              many navigation projects is limited by environmental or other reg-
                                                                              ulatory windows. Further limitations imposed by separately appor-
                                                                              tioning HMTF monies could cause serious disruptions to the eco-
                                                                              nomic activity that depends on these navigation channels.
                                                                                 For these reasons, the Committee disagrees with the change in
                                                                              apportionment policy and directs the Administration to follow the
                                                                              previous policy during any continuing resolutions that may occur in
                                                                              this or any future fiscal years.
                                                                                                               DEEP DRAFT NAVIGATION

                                                                                 The CARES Act (Public Law 116–136) made certain changes to
                                                                              the methods by which funds from the HMTF are treated under dis-
                                                                              cretionary budget rules. The Committee recommends an estimated
                                                                              $2,050,000,000 in accordance with these changes. This funding will
                                                                              enable the Corps to make significant progress on the backlog of
                                                                              dredging needs. Meeting these needs, including deeper drafts to ac-
                                                                              commodate the move toward larger ships, will be essential if the
                                                                              Nation is to remain competitive in international markets and to
                                                                              continue advancing economic development and job creation domes-
                                                                              tically.
                                                                                 Additionally, the Water Resources Development Act [WRDA] of
                                                                              2020 made certain changes to the methods by which funds for
                                                                              donor and energy transfer ports under section 2106(c) of the Water
                                                                              Resources Reform and Development Act [WRRDA] of 2014 are
                                                                              treated under discretionary budget rules. The Committee rec-
                                                                              ommends $50,000,000 for these purposes.
                                                                                                            INLAND WATERWAYS SYSTEM

                                                                                The Committee is disappointed and perplexed by the budget re-
                                                                              quest’s proposal to not fund any ongoing work and only spend
                                                                              $52,150,000 of the estimated $115,000,000 of deposits for fiscal
                                                                              year 2022 into the IWTF. The Corps shall continue to prioritize
                                                                              funding for ongoing construction projects. The inland waterways
                                                                              system is essential for national security and for sustaining our
                                                                              global economic competitiveness as it serves as an integral compo-
                                                                              nent of the Nation’s intermodal transportation system. Waterways
                                                                              are more efficient compared to alternative forms of freight trans-
                                                                              portation because barge transport allows for the movement of more
                                                                              cargo per shipment. Barges on the inland system transport many
                                                                              commodities including coal, petroleum, grain, and other farm prod-
                                                                              ucts. The importance of modernizing inland waterway infrastruc-
                                                                              ture is so important to these commercial users that they advocated
                                                                              for an increase to the fees they pay into the IWTF in 2014. Con-
                                                                              gress instituted this increase and took additional actions that al-
                                                                              lowed for two priority projects, the Olmsted Lock and Dam in Ken-
                                                                              tucky and the Lower Monongahela in Pennsylvania, to be funded
                                                                              to completion in fiscal year 2020. The success of this approach and
                                                                              the strategic importance of the inland waterway system is the rea-
                                                                              son the Committee does not understand why the administration
                                                                              would propose to delay progress by eliminating funding for ongoing
                                                                              construction projects. The budget request disregards the existing
                                                                              Capital Investment Strategy and the advice and recommendations




amozie on DSK123TN23PROD with REPORTS
                                                                              of industry experts and professional engineers. Therefore, the Com-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00007   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                  8

                                                                              mittee recommends appropriations that make full use of all esti-
                                                                              mated revenues from the IWTF for ongoing construction projects.
                                                                                                                 ADDITIONAL FUNDING

                                                                                 The Committee recommends funding above the budget request
                                                                              for Investigations, Construction, Operation and Maintenance, Mis-
                                                                              sissippi River and Tributaries, Regulatory, and Expenses. This
                                                                              funding is for additional work (including new starts) that either
                                                                              was not included in the budget request or was inadequately budg-
                                                                              eted. A study or project may not be excluded from evaluation for
                                                                              additional funding due to its inconsistency with administration pol-
                                                                              icy. None of the funds may be used for any item for which the Com-
                                                                              mittee has specifically denied funding.
                                                                                 The Committee includes the seven new start Investigations
                                                                              projects and four new start Construction projects proposed in the
                                                                              budget request without change. The Committee also includes addi-
                                                                              tional new starts in Investigations and Construction. No further
                                                                              new starts are recommended in this act.
                                                                                 The Administration is reminded these funds are in addition to its
                                                                              budget request, and Administration budget metrics shall not be a
                                                                              reason to disqualify a study or project from being funded. The focus
                                                                              of the allocation process shall favor the obligation, rather than the
                                                                              expenditure, of funds for work in fiscal year 2022.
                                                                                 Funding associated with each category of Additional Funding
                                                                              may be allocated to any eligible study or project, as appropriate,
                                                                              within that category; funding associated with each subcategory
                                                                              may be allocated only to eligible studies or projects, as appropriate,
                                                                              within that subcategory.
                                                                                 Work Plan.—Not later than 60 days after the date of enactment
                                                                              of this act, the Corps shall provide to the Committee a work plan
                                                                              consistent with the following general guidance, as well as the spe-
                                                                              cific direction the Committee provides within each account: (1) a
                                                                              detailed description of the rating system(s) developed and used to
                                                                              evaluate studies and projects; (2) delineation of how these funds
                                                                              are to be allocated; (3) a summary of the work to be accomplished
                                                                              with each allocation, including phase of work and the study or
                                                                              project’s remaining cost to complete (excluding Operation and
                                                                              Maintenance); and (4) a list of all studies and projects that were
                                                                              considered eligible for funding but did not receive funding, includ-
                                                                              ing an explanation of whether the study or project could have used
                                                                              funds in fiscal year 2022 and the specific reasons each study or
                                                                              project was considered less competitive for an allocation of funds.
                                                                                 The administration shall not delay apportioning the funding for
                                                                              Congressionally Directed Spending while developing the work plan
                                                                              for additional funding. The initiation of construction of an individ-
                                                                              ually authorized project funded within a programmatic line item
                                                                              shall not require a new start designation if some amount of con-
                                                                              struction funding under such programmatic line item was appro-
                                                                              priated and expended during the previous fiscal year. A study is
                                                                              not completed until preconstruction engineering and design [PED]
                                                                              is completed. The Committee urges the Corps within its Flood and
                                                                              Coastal Storm Damage Reduction mission to strive for a balance
                                                                              between inland and coastal projects. The Corps is encouraged to




amozie on DSK123TN23PROD with REPORTS
                                                                              support opportunities to restore critical habitat and enhance the




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00008   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                  9

                                                                              Nation’s economic development, job growth, and international com-
                                                                              petitiveness.
                                                                                The following shall not require a new start or new investment
                                                                              decision and shall be considered ongoing work:
                                                                                —When moving from feasibility to PED;
                                                                                —To initiate work on a separable element of a project when con-
                                                                                   struction of one or more separable elements of that project was
                                                                                   initiated previously;
                                                                                —Any authorized environmental infrastructure project;
                                                                                —Study or construction activities related to individual projects
                                                                                   authorized under section 1037 of WRRDA;
                                                                                —Work undertaken to correct a design deficiency on an existing
                                                                                   Federal project; and
                                                                                —Projects that have previously received construction funding for
                                                                                   authorized work.
                                                                                                                       INVASIVE CARP

                                                                                 The Corps is undertaking multiple efforts to stop invasive carp
                                                                              from reaching the Great Lakes. These actions are critical to pro-
                                                                              tecting the Great Lakes ecosystem and the $7,000,000,000 rec-
                                                                              reational fishing and $16,000,000,000 boating industries. Last year,
                                                                              the Corps sent Congress an approved Chief’s Report for a plan to
                                                                              build a comprehensive suite of measures to counter invasive carp
                                                                              at the Brandon Road Lock and Dam, a critical choke point to halt
                                                                              the spread of invasive species in the Illinois River. The Committee
                                                                              is encouraged to see funding is included in the fiscal year 2022
                                                                              budget request to continue work on PED.
                                                                                 As the Corps prioritizes projects, it shall consider critical projects
                                                                              to prevent the spread of invasive species. The Corps is directed to
                                                                              provide quarterly updates to the Committee on the progress and
                                                                              status of efforts to prevent the further spread of invasive carp in-
                                                                              cluding the Brandon Road Recommended Plan and the second
                                                                              array at the Chicago Sanitary and Ship Canal; the location and
                                                                              density of carp populations; the use of emergency procedures pre-
                                                                              viously authorized by the Congress; and the development, consider-
                                                                              ation, and implementation of new technological and structural
                                                                              countermeasures; and the progress on PED work.
                                                                                 The Corps shall continue to collaborate at levels commensurate
                                                                              with previous years with the U.S. Coast Guard, the U.S. Fish and
                                                                              Wildlife Service, the State of Illinois, and members of the Invasive
                                                                              Carp Regional Coordinating Committee, including identifying navi-
                                                                              gation protocols that would be beneficial or effective in reducing
                                                                              the risk of vessels inadvertently carrying aquatic invasive species,
                                                                              including invasive carp, through the Brandon Road Lock and Dam
                                                                              in Joliet, Illinois. Any findings of such an evaluation shall be in-
                                                                              cluded in the quarterly briefings to the Committees. The Corps is
                                                                              further directed to implement navigation protocols shown to be ef-
                                                                              fective at reducing the risk of entrainment without jeopardizing the
                                                                              safety of vessels and crews. The Corps shall brief the Committee
                                                                              on such navigation protocols and potential solutions within 30 days
                                                                              of enactment of this act.




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00009   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                              10

                                                                                                           ADVANCED FUNDS AGREEMENTS

                                                                                 Under the advanced funds authority, the Corps is authorized to
                                                                              accept, from a State or political subdivision thereof, all funds cov-
                                                                              ering both the Federal and non-Federal share of total project costs
                                                                              required to construct an authorized water resources development
                                                                              project or separable element thereof. Based on the non-Federal
                                                                              sponsor’s commitment to provide all funds required to construct a
                                                                              project, or separable element thereof, the Corps may undertake
                                                                              construction of the project prior to a new start determination re-
                                                                              lated to Federal funding for the project. In light of a non-Federal
                                                                              sponsor’s commitment to provide all funding required for construc-
                                                                              tion of the project, or separable element thereof, the Committee di-
                                                                              rects that Federal funds shall not be provided for such construc-
                                                                              tion. Instead, for such projects, any Federal funding may be pro-
                                                                              vided only after completion of construction, as repayment of the
                                                                              Federal share of such construction, from funding provided in this
                                                                              or subsequent acts for reimbursements or repayments, and would
                                                                              be subject to a new start designation. The Committee does not in-
                                                                              tend that this direction apply to any project with an advanced
                                                                              funds project partnership agreement was in place prior to Decem-
                                                                              ber 20, 2019.
                                                                                                    CONGRESSIONALLY DIRECTED SPENDING

                                                                                The Committee included congressionally directed spending, as
                                                                              defined in section 5(a) of rule XLIV of the Standing Rules of the
                                                                              Senate. The Committee funded only projects and studies that are
                                                                              authorized by law. In the interest of providing full disclosure of
                                                                              funding provided in this Title, all projects requested and funded
                                                                              are listed in a table accompanying this report. All of the projects
                                                                              funded in this report have gone through the same rigorous process
                                                                              and approvals as those proposed by the President.
                                                                                                               CONTINUING CONTRACTS

                                                                                 The Corps is authorized by section 621 of title 33, United States
                                                                              Code to execute its Civil Works projects through the use of a Spe-
                                                                              cial Continuing Contract Clause as described in Engineering Circu-
                                                                              lars 11–2-221 and 11–2-222. This permits the Corps to award the
                                                                              entire contract and fund the contract incrementally until comple-
                                                                              tion. This acquisition strategy is well-suited to large, multi-year
                                                                              projects, including those with life safety, national security, or legal
                                                                              concerns, and is being used successfully at multiple projects nation-
                                                                              wide. The Administration is directed to resume using its existing
                                                                              continuing contract authorities in accordance with the general pro-
                                                                              visions in this act as an efficient approach to managing large,
                                                                              multi-year projects.
                                                                                                                UPDATED CAPABILITIES

                                                                                Given the nature of the Civil Works program, the Committee un-
                                                                              derstands the assumptions made in the budget request regarding
                                                                              the amount of work that can be accomplished in fiscal year 2022
                                                                              for a particular project can change for a number of unforeseen rea-




amozie on DSK123TN23PROD with REPORTS
                                                                              sons. The Committee expects updated capabilities will be addressed




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00010   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                                                           11

                                                                              and adjusted during conference using the latest data available at
                                                                              that time.
                                                                                                                                                       REPROGRAMMING

                                                                                The Committee is retaining the reprogramming legislation pro-
                                                                              vided in the Energy and Water Development and Related Agencies
                                                                              Appropriations Act, 2020 (Public Law 116–94).
                                                                                                                                           REPORTING REQUIREMENT

                                                                                The Corps shall provide a quarterly report to the Committee,
                                                                              which includes the total budget authority and unobligated balances
                                                                              by year for each program, project, or activity, including any prior
                                                                              year appropriations.
                                                                                The Assistant Secretary of the Army (Civil Works) shall provide
                                                                              a quarterly report to the Committee, which includes the total budg-
                                                                              et authority and unobligated balances by year for each activity
                                                                              funded in the Office of the Assistant Secretary of the Army (Civil
                                                                              Works) account, including any prior year appropriations.
                                                                                                                                                        INVESTIGATIONS

                                                                              Appropriations, 2021 .............................................................................                                                                $153,000,000
                                                                              Budget estimate, 2022 ...........................................................................                                                                  105,837,000
                                                                              Committee recommendation .................................................................                                                                         153,000,000
                                                                                The Committee recommends $153,000,000 for Investigations.
                                                                              Funding in this account is used to develop feasibility studies and
                                                                              conduct PED to address the Nation’s water infrastructure needs, in
                                                                              support of project authorization.
                                                                                                                                    COMMITTEE RECOMMENDATION

                                                                                The table below displays the budget request and the Committee’s
                                                                              recommendation for Investigations:
                                                                                                                                      CORPS OF ENGINEERS—INVESTIGATIONS
                                                                                                                                                            [In thousands of dollars]

                                                                                                                                                                                                                          Budget                  Committee
                                                                                                                                       Project title                                                                     estimate              recommendation

                                                                                                                                     ALABAMA
                                                                              CLAIRBORNE AND MILLERS FERRY LOCKS AND DAMS (FISH PASSAGE), LOWER ALA-
                                                                                BAMA RIVER, AL ........................................................................................................                               600                       600
                                                                              TENNESSEE TOMBIGBEE AND BLACK WARRIOR TOMBIGBEE DEEPENING STUDY, AL &
                                                                                MS ..............................................................................................................................   ........................                     400
                                                                                                                                         ALASKA
                                                                              AKUTAN HARBOR NAVIGATIONAL IMPROVEMENTS, AK ...................................................                                                         100      ........................   †
                                                                              ELIM SUBSISTENCE HARBOR, AK ...................................................................................                                      2,000                      2,000
                                                                              LOWELL CREEK FLOOD DIVERSION, AK ..........................................................................                           ........................                  3,000
                                                                                                                                        ARIZONA
                                                                              LITTLE COLORADO RIVER, WINSLOW, AZ ........................................................................                           ........................                     500
                                                                                                                                      CALIFORNIA
                                                                              LOS ANGELES COUNTY DRAINAGE AREA (CHANNELS), CA ............................................                                                            565      ........................   †
                                                                              LOS ANGELES RIVER ECOSYSTEM RESTORATION, CA ....................................................                                                     1,693                      1,693
                                                                              LOWER CACHE CREEK, CA .............................................................................................                   ........................                  2,000
                                                                              LOWER MISSION CREEK, CA (GENERAL REEVALUATION REPORT) .................................                                                                 600                        600
                                                                              LOWER SAN JOAQUIN (LATHROP & MANTECA), CA ........................................................                                    ........................                     200




amozie on DSK123TN23PROD with REPORTS
                                                                              MURRIETA CREEK, CA (GENERAL REEVALUATION REPORT) ...........................................                                                            600                        600




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272              PO 00000              Frm 00011               Fmt 6604             Sfmt 6602              U:\SR036.XXX                 SR036
                                                                                                                                                                            12
                                                                                                                          CORPS OF ENGINEERS—INVESTIGATIONS—Continued
                                                                                                                                                            [In thousands of dollars]

                                                                                                                                                                                                                           Budget                  Committee
                                                                                                                                        Project title                                                                     estimate              recommendation

                                                                              IMPERIAL STREAMS SALTON SEA, CA ............................................................................                           ........................                    200
                                                                              SAN DIEGO COUNTY SHORELINE (OCEANSIDE), CA .......................................................                                     ........................                    750
                                                                              SANTA PAULA CREEK, CA ...............................................................................................                  ........................                    200
                                                                              SOUTH SAN FRANCISCO BAY SHORELINE (SANTA CLARA COUNTY), CA ........................                                                    ........................                  1,600
                                                                                                                                     CONNECTICUT
                                                                              HARTFORD, CT & EAST HARTFORD, CT ..........................................................................                            ........................                     200
                                                                                                                                       COLORADO
                                                                              ADAMS & DENVER SOUTH PLATTE RIVER, CO ...............................................................                                  ........................                     400
                                                                                                                                         FLORIDA
                                                                              CENTRAL & SOUTHERN FLORIDA (C&SF) FLOOD RESILIENCY (SECTION 216) STUDY,
                                                                                FL ...............................................................................................................................                    500                         500
                                                                                                                                          HAWAII
                                                                              HONOLULU HARBOR MODIFICATION FEASIBILITY STUDY, HI ..........................................                                          ........................                     800
                                                                                                                                           IDAHO
                                                                              BOISE RIVER, GARDEN CITY, ADA COUNTY, ID ..............................................................                                                  500                        500
                                                                                                                                         ILLINOIS
                                                                              CHICAGO SHORELINE, IL (GENERAL REEVALUATION REPORT) .......................................                                                              500                       500
                                                                              IL RIVER 519 FOX RIVER DAMS RESTORATION, IL ........................................................                                   ........................                    250
                                                                              GREAT LAKES COASTAL RESILIENCY STUDY, IL, IN, MI, MN, NY, OH, PA and WI .........                                                                        500                       500
                                                                              INTERBASIN CONTROL OF GREAT LAKES—MISSISSIPPI RIVER AQUATIC NUISANCE
                                                                                 SPECIES, IL, IN, OH & WI ..........................................................................................                                4,940                      4,940
                                                                              MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS (MVR PORTION), IL                                                                               700      ........................   ‡
                                                                              UPPER DES PLAINES RIVER FLOODING & RESTORATION, IL ..........................................                                          ........................                  1,525
                                                                                                                                          KANSAS
                                                                              LOWER MISSOURI RIVER BASIN, KS, MO and IA ...........................................................                                                    600                       600
                                                                                                                                        LOUISIANA
                                                                              PORT FOURCHON BELLE PASS CHANNEL, LA .................................................................                                 ........................                  1,500
                                                                                                                                        MICHIGAN
                                                                              ALTAMAHA RIVER, OCONEE RIVER AND OCMULGEE RIVERS, BELLVILLE POINT HAR-
                                                                                BOR, DARIEN HARBOR, FANCY BLUFF CREEK, SAPELO HARBOR, SATILLA RIVER
                                                                                AND ST MARYS RIVER WATERWAYS, MI ....................................................................                                                  100      ........................   †
                                                                                                                                       MINNESOTA
                                                                              ST ANTHONY FALLS, MISSISSIPPI RIVER, MN .................................................................                                                250      ........................   †
                                                                              MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS (MVP PORTION),
                                                                                 MN ..............................................................................................................................                  1,650       ........................   ‡
                                                                                                                                        MISSOURI
                                                                              LITTLE BLUE RIVER BASIN, JACKSON COUNTY, MO .......................................................                                                      600                       600
                                                                              LOWER MISSOURI BASIN—BRUNSWICK L–246, MO ......................................................                                        ........................                    500
                                                                              LOWER MISSOURI BASIN—HOLT COUNTY, MO, DONIPHAN COUNTY, KS ......................                                                       ........................                    300
                                                                              LOWER MISSOURI BASIN—JEFFERSON CITY L–142, MO ...............................................                                          ........................                    300
                                                                                                                                      NEW JERSEY
                                                                              NEW JERSEY BACK BAYS, NJ .........................................................................................                                       750                       750
                                                                              NEW YORK AND NEW JERSEY HARBOR, NY & NJ ..........................................................                                     ........................                  1,125
                                                                              PECKMAN RIVER BASIN, NJ ............................................................................................                   ........................                    500
                                                                              RARITAN BAY AND SANDY HOOK BAY, HIGHLANDS, NJ .................................................                                        ........................                    750
                                                                              RARITAN RIVER BASIN, GREEN BROOK SUB–BASIN, NJ ................................................                                        ........................                    300
                                                                                                                                       NEW YORK
                                                                              HUDSON RARITAN ESTUARY ECOSYSTEM RESTORATION, NY & NJ ................................                                                 ........................                 1,200




amozie on DSK123TN23PROD with REPORTS
                                                                              NEW YORK—NEW JERSEY HARBOR AND TRIBUTARIES, NY and NJ ..............................                                                                  1,450                     1,450




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272              PO 00000               Frm 00012               Fmt 6604             Sfmt 6602              U:\SR036.XXX                 SR036
                                                                                                                                                                         13
                                                                                                                         CORPS OF ENGINEERS—INVESTIGATIONS—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                                                      Budget                  Committee
                                                                                                                                      Project title                                                                  estimate              recommendation

                                                                              SPRING CREEK SOUTH, JAMAICA BAY (HOWARD BEACH), QUEENS, NY ........................                                                                 500                        500
                                                                                                                                NORTH CAROLINA
                                                                              WILMINGTON NAVIGATION HARBOR IMPROVEMENTS, NC ...............................................                                     ........................                     500
                                                                                                                                         OHIO
                                                                              ASHTABULA HARBOR, OH ...............................................................................................                                300      ........................   ‡
                                                                              CLEVELAND HARBOR, OH ...............................................................................................                                300      ........................   ‡
                                                                              CONNEAUT HARBOR, OH ................................................................................................                                300      ........................   ‡
                                                                              FAIRPORT HARBOR, OH ..................................................................................................                              300      ........................   ‡
                                                                              SANDUSKY HARBOR, OH .................................................................................................                               300      ........................   ‡
                                                                                                                                     OKLAHOMA
                                                                              ARKANSAS RIVER NAVIGATION, MKARNS 12–FT CHANNEL, OK .....................................                                         ........................                     500
                                                                              OPTIMA LAKE, OK ...........................................................................................................                         200      ........................   †
                                                                                                                                       OREGON
                                                                              COLUMBIA RIVER TREATY 2024 IMPLEMENTATION, OR & WA .......................................                                                     10,000        ........................   ‡
                                                                              WILLAMETTE RIVER ENVIRONMENTAL DREDGING, OR ....................................................                                  ........................                     732
                                                                                                                                   PUERTO RICO
                                                                              CAÑO MARTIN PEÑA ECOSYSTEM RESTORATION, PR .....................................................                                               2,150                     2,150
                                                                                                                                  RHODE ISLAND
                                                                              LITTLE NARRAGANSETT BAY, RI .....................................................................................                                   500                        500
                                                                                                                                SOUTH CAROLINA
                                                                              PORT ROYAL HARBOR, SC ..............................................................................................                               342       ........................   †
                                                                              WACCAMAW RIVER, HORRY COUNTY, SC .......................................................................                                           500                         500
                                                                                                                                  SOUTH DAKOTA
                                                                              WATERTOWN FLOOD RISK MANAGEMENT, SD .................................................................                             ........................                    200
                                                                                                                                     TENNESSEE
                                                                              HATCHIE/LOOSAHATCHIE, MISSISSIPPI RIVER MILE 775–736 HABITAT RESTORATION,
                                                                                TN & AR .....................................................................................................................                     600                       600
                                                                                                                                        TEXAS
                                                                              ARKANSAS–RED RIVER CHLORIDE CONTROL, AREA VIII, TX ..........................................                                                      343       ........................   †
                                                                              CITY OF EL PASO, TX .....................................................................................................                          600                         600
                                                                              ESTELLINE SPRINGS EXPERIMENTAL PROJECT, TX .........................................................                                               200       ........................   †
                                                                              GIWW—BRAZOS RIVER FLOODGATES & COLORADO RIVER LOCKS, TX .........................                                                                6,932                      6,932
                                                                              WESTSIDE CREEKS ECOSYSTEM RESTORATION, SAN ANTONIO, TX ...............................                                                           2,340                      2,340
                                                                                                                                 VIRGIN ISLANDS
                                                                              SAVAN GUT PHASE II, ST THOMAS, VI ............................................................................                                  3,777                       3,777
                                                                                                                                   WASHINGTON
                                                                              COLUMBIA RIVER TURNING BASIN NAVIGATION IMPROVEMENTS, WA & OR .................                                                   ........................                     200
                                                                              PUGET SOUND NEARSHORE MARINE HABITAT RESTORATION, WA .................................                                            ........................                     250
                                                                                                                                  WEST VIRGINIA
                                                                              KANAWHA RIVER BASIN FEASIBILITY, WV .......................................................................                       ........................                     500
                                                                                                                                     WISCONSIN
                                                                              KEWAUNEE HARBOR, WI .................................................................................................                               300      ........................   ‡
                                                                              MANITOWOC HARBOR, WI ...............................................................................................                                300      ........................   ‡
                                                                              MENOMINEE RIVER DEEPENING, WI ...............................................................................                     ........................                     200




amozie on DSK123TN23PROD with REPORTS
                                                                              OTTER CREEK WATERSHED WETLAND RESTORATION, WI ...............................................                                                         75     ........................   †




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00013              Fmt 6604            Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                           14
                                                                                                                          CORPS OF ENGINEERS—INVESTIGATIONS—Continued
                                                                                                                                                            [In thousands of dollars]

                                                                                                                                                                                                                          Budget                  Committee
                                                                                                                                       Project title                                                                     estimate              recommendation

                                                                                                                                        WYOMING
                                                                              LITTLE GOOSE CREEK, SHERIDAN, WY ...........................................................................                                           500                        500

                                                                                          SUBTOTAL, ITEMS UNDER STATES ....................................................................                                     50,857                     55,814
                                                                                                                                 REMAINING ITEMS
                                                                              ADDITIONAL FUNDING FOR ONGOING WORK ...................................................................                               ........................                  9,513
                                                                              FLOOD AND STORM DAMAGE REDUCTION ......................................................................                               ........................   ........................
                                                                              FLOOD CONTROL .............................................................................................................           ........................   ........................
                                                                              SHORE PROTECTION .......................................................................................................              ........................   ........................
                                                                              NAVIGATION ....................................................................................................................       ........................   ........................
                                                                              COASTAL AND DEEP-DRAFT ............................................................................................                   ........................   ........................
                                                                              INLAND ............................................................................................................................   ........................   ........................
                                                                              OTHER AUTHORIZED PROJECT PURPOSES ......................................................................                              ........................   ........................
                                                                              ENVIRONMENTAL RESTORATION OR COMPLIANCE .........................................................                                     ........................   ........................
                                                                              ACCESS TO WATER DATA ...............................................................................................                                    325                        325
                                                                              AUTOMATED INFORMATION SYSTEMS SUPPORT TRI–CADD ............................................                                                             250                        250
                                                                              COASTAL FIELD DATA COLLECTION ................................................................................                                       1,500                      3,000
                                                                              COORDINATION WITH OTHER WATER RESOURCE AGENCIES ..........................................                                                              450                        450
                                                                              DISPOSITION OF COMPLETED PROJECTS ........................................................................                            ........................                  1,657
                                                                              ENVIRONMENTAL DATA STUDIES ....................................................................................                                           80                         80
                                                                              FERC LICENSING .............................................................................................................                            100                        100
                                                                              FLOOD DAMAGE DATA .....................................................................................................                                 275                        275
                                                                              FLOOD PLAIN MANAGEMENT SERVICES ..........................................................................                                         15,400                     15,400
                                                                              HYDROLOGIC STUDIES ....................................................................................................                                 500                        500
                                                                              INTERNATIONAL WATER STUDIES ....................................................................................                                        100                        100
                                                                              INTERAGENCY WATER RESOURCE DEVELOPMENT ..........................................................                                                         75                         75
                                                                              INVENTORY OF DAMS .....................................................................................................                                 400                        400
                                                                              NATIONAL FLOOD RISK MANAGEMENT PROGRAM ...........................................................                                                   6,500                      6,500
                                                                              NATIONAL SHORELINE MANAGEMENT STUDY .................................................................                                 ........................                  1,500
                                                                              PLANNING ASSISTANCE TO STATES ................................................................................                                       7,000                    11,000
                                                                              PLANNING SUPPORT PROGRAM ......................................................................................                                      3,500                      3,500
                                                                              PRECIPITATION STUDIES .................................................................................................                                 150                        150
                                                                              REMOTE SENSING/GEOGRAPHIC INFORMATION SYSTEM SUPPORT ................................                                                                     75                         75
                                                                              RESEARCH AND DEVELOPMENT ......................................................................................                                    15,000                     35,000
                                                                              SCIENTIFIC AND TECHNICAL INFORMATION CENTERS ....................................................                                                         50                         50
                                                                              SPECIAL INVESTIGATIONS ...............................................................................................                                  750                        750
                                                                              STREAM GAGING .............................................................................................................                          1,500                      1,500
                                                                              TRANSPORTATION SYSTEMS ...........................................................................................                                   1,000                      1,000
                                                                              TRIBAL PARTNERSHIP PROGRAM ....................................................................................                       ........................                  4,036

                                                                                          SUBTOTAL, REMAINING ITEMS ..........................................................................                                  54,980                     97,186

                                                                                          GRAND TOTAL ....................................................................................................                    105,837                    153,000
                                                                                 † Funded in remaining items
                                                                                 ‡ Funded in a remaining item in another account
                                                                                 * Includes funds requested in Projects Listed Under States within this account

                                                                                Arkansas Red River Chloride.—The Committee rejects the budget
                                                                              request to fund a disposition study of this project. The Corps is di-
                                                                              rected to brief the Committee within 60 days of enactment on the
                                                                              status of the project.
                                                                                Bubbly Creek.—The Committee is disappointed that negotiations
                                                                              between the Corps, the Environmental Protection Agency, and the
                                                                              Department of Justice over remaining liability concerns have yet to
                                                                              produce an outcome that will allow the project to move forward.
                                                                              The Committee urges the parties to expedite a resolution and di-
                                                                              rects the Corps to brief the Committee within 90 days of enact-




amozie on DSK123TN23PROD with REPORTS
                                                                              ment.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272              PO 00000              Frm 00014               Fmt 6604             Sfmt 6602              U:\SR036.XXX                 SR036
                                                                                                                              15

                                                                                 Chicago River.—The Committee urges the Corps to work with
                                                                              the City of Chicago River Ecology and Governance Task Force to-
                                                                              wards a comprehensive ecosystem restoration project for the res-
                                                                              toration of the Chicago River. The Corps is encouraged to consider
                                                                              including funding for this study in future budget submissions.
                                                                                 Chicago Shoreline.—The Committee remains concerned that lake
                                                                              levels in the Great Lakes are predicted to surpass record high lev-
                                                                              els and strongly encourages the Corps to reevaluate the conclusions
                                                                              of the original feasibility report to assess Federal interest in pro-
                                                                              viding additional coastal protection along the Chicago shoreline.
                                                                              The Committee reminds the Corps that the Chicago Shoreline can
                                                                              be a focus area of the Great Lakes Resiliency Study.
                                                                                 Coastal Field Data Collection.—The Committee strongly supports
                                                                              this program and the Corps’ commitment to collect and maintain
                                                                              wave data, water level data, and other data critical to making in-
                                                                              formed decisions in our coastal areas. The Committee is concerned
                                                                              about the ability of the Corps to meets its obligation to maintain
                                                                              this critical capability at the proposed funding levels. Therefore,
                                                                              the Committee recommends an additional $1,500,000 above the
                                                                              budget request amount of $1,500,000 to continue data collection
                                                                              and research on the impact of extreme storms in coastal regions.
                                                                              Additionally, with the funds provided, the committee encourages
                                                                              the Corps to evaluate the readiness of the unique facilities and
                                                                              equipment necessary to support this effort and to include increased
                                                                              funding in future budget submissions in order to revitalize and
                                                                              modernize facilities and equipment in support of this program.
                                                                                 Flood Policy in Urban Areas.—The Committee has continually
                                                                              requested the Flood Policy in Urban Areas report as detailed in by
                                                                              section 1211 of America’s Water Infrastructure Act of 2018 (Public
                                                                              Law 115–270) [AWIA 2018]. The Corps is reminded that this report
                                                                              can be completed using existing funds and encourages the Corps to
                                                                              include reporting requirements in future budget submissions, if
                                                                              needed. The Committee directs the Corps, to provide a briefing on
                                                                              the findings of this report within 45 days of enactment.
                                                                                 Inland Navigation Modernization Projects.—The Corps is urged
                                                                              to continue PED activities on inland modernization projects to pre-
                                                                              vent delays to project delivery and prepare projects for construc-
                                                                              tion.
                                                                                 McClellan-Kerr Arkansas River Navigation System [MKARNS].—
                                                                              The MKARNS is an established Marine Highway for waterborne
                                                                              commerce, relieving our Nation’s highways and bridges from addi-
                                                                              tional congestion and wear and tear. MKARNS supports economic
                                                                              activity across a 12-State region, moving 11 million tons of com-
                                                                              merce worth $4,000,000,000 annually. MKARNS is a vital corridor
                                                                              for agriculture commerce (soybeans and wheat) and aggregate com-
                                                                              modities (sand, gravel, and rock) from the Gulf Coast to the Mid-
                                                                              West. Farmers and ranchers rely on its availability year round to
                                                                              move crops to markets in all seasons and facilitate the movement
                                                                              of fertilizer domestically to prepare for the growing season each
                                                                              year.
                                                                                 MKARNS needs to be deepened with a consistent 12-foot naviga-
                                                                              tion channel to provide tow drafts that are more compatible with
                                                                              navigation on the Mississippi River. The current disparity results




amozie on DSK123TN23PROD with REPORTS
                                                                              in less efficient barge operations and higher transportation costs.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00015   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              16

                                                                              The Committee understands this project has capability to complete
                                                                              economic impacts and environmental updates and strongly urges
                                                                              the Corps to prioritize this effort in fiscal year 2022 to continue
                                                                              construction as soon as practicable. The Committee continues to
                                                                              encourage the Corps to provide funds for non-structural activities,
                                                                              such as channel deepening, with low annual funding needs in years
                                                                              where appropriated funds for IWTF cost shared projects are suffi-
                                                                              cient to accommodate such projects without impacting ongoing con-
                                                                              struction projects. The Corps shall brief the Committee within 90
                                                                              days of enactment of this act on section 159 of WRDA 2020.
                                                                                 Finally, the Committee encourages the Corps to prioritize inland
                                                                              waterways projects consistent with the update to the Capital In-
                                                                              vestment Strategy, pursuant to section 2002(d) of WRRDA 2014.
                                                                                 McMicken Dam, Arizona.—The Committee recognizes the impor-
                                                                              tance of the McMicken Dam project in providing flood protection to
                                                                              the region, including Luke Air Force Base, which delivers national
                                                                              security benefits to the Nation. The Corps is reminded to consider
                                                                              the value of national security in prioritizing and formulating stud-
                                                                              ies and projects.
                                                                                 New York-New Jersey Harbor and Tributaries Study.—The Com-
                                                                              mittee appreciates that the budget request includes $1,450,000 to
                                                                              continue this study. The Committee expects the Corps to vigorously
                                                                              engage community groups and incorporate impacts of low-fre-
                                                                              quency precipitation and impacts of sea level rise in the study. The
                                                                              Corps is directed to brief the Committee within 45 days of enact-
                                                                              ment of this act on how it plans to follow these steps.
                                                                                 North Atlantic Division Report on Hurricane Barriers and Har-
                                                                              bors of Refuge.—The Committee continues to express the impor-
                                                                              tance of the North Atlantic Division report on hurricane barriers
                                                                              and harbors of refuge mandated under Section 1218 of AWIA 2018.
                                                                              The Corps is reminded that this report can be completed using ex-
                                                                              isting funds and encourages the Corps to include reporting require-
                                                                              ments in future budget requests, if needed. Within 90 days of en-
                                                                              actment of this act, the Corps shall brief the Committee on the sta-
                                                                              tus and path forward for the report.
                                                                                 Planning Assistance to States.—The Corps is reminded that this
                                                                              program encompasses many types of studies and technical assist-
                                                                              ance dealing with a number of water resource issues, including but
                                                                              not limited to, sediment management, coastal resilience, State
                                                                              water planning, water distribution, and water supply evaluations.
                                                                                 Puget Sound Nearshore Study.—The Committee encourages the
                                                                              Corps to proceed with the tiered implementation strategy using all
                                                                              existing authorities as outlined in the Puget Sound Nearshore Eco-
                                                                              system Restoration Project Feasibility Study, Completion Strategy
                                                                              Guidance dated June 2015. The Corps is directed to recognize the
                                                                              Puget Sound Nearshore Study as the feasibility component for the
                                                                              purposes of section 544 of WRDA 2000 (Public Law 106–541). The
                                                                              Committee notes that the Water Infrastructure Improvements for
                                                                              the Nation Act (Public Law 114–332) [WIIN Act] authorized con-
                                                                              struction of the Puget Sound Nearshore Ecosystem Restoration
                                                                              Project. The Committee reminds the Corps that consistent with the
                                                                              direction in this report no new start, new investment decision, or
                                                                              new phase decision shall be required to continue this project in




amozie on DSK123TN23PROD with REPORTS
                                                                              PED.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00016   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              17

                                                                                 Research and Development—Future Work.—The Committee ap-
                                                                              preciates and recognizes the value of research topics currently
                                                                              being addressed by the Army Engineer Research and Development
                                                                              Center [ERDC] towards advancing the Civil Works missions of the
                                                                              Corps. The Committee understands that the ERDC and the Corps
                                                                              have identified a series of critical research categories that will ad-
                                                                              vance the efficient implementation of the Civil Works mission and
                                                                              provide value to the Nation. The Committee also understands that
                                                                              responding to these research needs can benefit the Corps by
                                                                              leveraging the expertise of universities through partnerships. The
                                                                              Committee directs the ERDC, within 90 days of enactment of this
                                                                              act, to brief the Committee on future research needs (including
                                                                              multi-year funding requirements) and potential university partner-
                                                                              ships related to its strategic goals.
                                                                                 Research and Development—Biopolymers.—The Committee rec-
                                                                              ommends $6,000,000 of additional funding to continue research on
                                                                              the use of biopolymers to rehabilitate civil works structures, reduce
                                                                              the costs of rehabilitating and maintaining these structures, and
                                                                              increase resiliency of these structures against potential threats.
                                                                              With continued funding, the Committee understands this effort will
                                                                              be completed in 2 years.
                                                                                 Research and Development—Flood and Coastal Systems.—The
                                                                              Committee recognizes the importance of ensuring the integrity of
                                                                              our Nation’s flood control systems and employing the most effective
                                                                              technologies to identify potential deficiencies in these systems. The
                                                                              Committee recommends $5,000,000 to utilize partnerships to re-
                                                                              search and develop advanced technology to automate assessment
                                                                              and inspection of flood control systems for the purpose of identi-
                                                                              fying levee deficiencies, such as slope instability, settlement and
                                                                              seepage, and ensuring the safety of the surrounding areas and com-
                                                                              munities. Within 90 days of enactment of this act, the Corps shall
                                                                              provide to the Committee a proposal for this effort including a de-
                                                                              tailed scope of work with a breakdown of research activities, work
                                                                              to be performed by the Corps and academia, specific deliverables,
                                                                              and schedule and funding requirements. Additionally, the Com-
                                                                              mittee is interested in how this work can contribute to existing op-
                                                                              erations and maintenance activities and how potential cybersecu-
                                                                              rity concerns can be addressed.
                                                                                 Research and Development—Freshwater Intrusion.—The Com-
                                                                              mittee recognizes the need to develop tools to assess, forecast, and
                                                                              proactively manage the hydrodynamic and environmental impacts
                                                                              of large-scale freshwater intrusion into the Mississippi Sound and
                                                                              surrounding waters. These consistent freshwater intrusions have
                                                                              been detrimental to the Mississippi Sound and the U.S. blue econ-
                                                                              omy. The Corps is encouraged to partner with academia with ex-
                                                                              pertise in coastal processes and ocean and hydrodynamic modeling
                                                                              to develop these tools.
                                                                                 Research and Development—Geophysical Modeling.—Rising sea
                                                                              levels and the increasing severity and frequency of weather events
                                                                              continues to impact coastlines, rivers, and related habitats. Addi-
                                                                              tional funding of $4,000,000 is provided to continue research using
                                                                              geophysical computational modeling. The Committee understands
                                                                              that with continued funding this effort will be completed in 3




amozie on DSK123TN23PROD with REPORTS
                                                                              years.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00017   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              18

                                                                                 Research and Development—Oyster Restoration.—The Committee
                                                                              recognizes the importance of sustainable oyster reefs for maintain-
                                                                              ing healthy ecosystems, protecting coastal infrastructure and sup-
                                                                              porting commercial fisheries. Recent restoration efforts have not
                                                                              achieved the intended success for U.S. oyster populations, and the
                                                                              identification of effective restoration strategies remains a critical
                                                                              gap. The Committee recommends additional funding of $2,600,000
                                                                              to continue the oyster reef restoration research and understands
                                                                              this effort will be completed in fiscal year 2022.
                                                                                 Research and Development—Polymer Composites.—The Com-
                                                                              mittee recognizes that polymer composites have wide-ranging prov-
                                                                              en characteristics including lightweight, high strength, corrosion
                                                                              resistance, and long-term durability that could translate to in-
                                                                              creased safety for inland waterways infrastructure. The Committee
                                                                              supports investigating the value of incorporating polymer compos-
                                                                              ites into infrastructure applications in navigable waterways. With-
                                                                              in 90 days of enactment of this act, the Corps shall provide to the
                                                                              Committee a proposal for this effort including a detailed scope of
                                                                              work, a breakdown of research activities, work to be performed by
                                                                              the Corps and academia, specific deliverables, and schedule and
                                                                              funding requirements.
                                                                                 Research and Development—Subsurface Drains.—The Committee
                                                                              understands the use of subsurface drain systems as a flood risk re-
                                                                              duction measure or coastal storm risk reduction measure are cur-
                                                                              rently not considered during project development. Within 90 days
                                                                              of enactment of this act, the Corps shall brief the Committee on re-
                                                                              search and development opportunities of subsurface drain systems
                                                                              pursuant to section 227 of WRDA 2020.
                                                                                 Research and Development—Urban Flood Damage Reduction and
                                                                              Stream Restoration in Arid Regions.—The Committee recommends
                                                                              additional funds of $2,000,000 to continue the work on the manage-
                                                                              ment of water resources projects that promote public safety, reduce
                                                                              risk, improve operational efficiencies, reduce flood damage in arid
                                                                              and semi-arid regions, sustain the environment, and position our
                                                                              water resources systems to be managed as systems that are adapt-
                                                                              able to the implications of a changing climate. The research and
                                                                              development program shall also continue its focus on science and
                                                                              technology efforts to address needs for resilient water resources in-
                                                                              frastructure. The Committee understands that with continued
                                                                              funding this effort will be complete in 3 years.
                                                                                 Shore Protection Easements.—The Committee notes the impor-
                                                                              tance of periodic restoration of the Shore Protection Projects and
                                                                              their significance for the protection of public safety, public infra-
                                                                              structure, native vegetation and wildlife, as well as economy sta-
                                                                              bility in oceanfront communities. The Committee understands the
                                                                              challenges facing local governments in obtaining the necessary ap-
                                                                              provals for required easements when no work will be performed on
                                                                              the property for which the easement is being required. The Com-
                                                                              mittee encourages the Corps to work with local governments to in-
                                                                              corporate flexibility in project agreement language that allows for
                                                                              incremental acquisition of easements necessary for scheduled nour-
                                                                              ishments.
                                                                                 South Atlantic Coastal Study.—The Committee acknowledges the




amozie on DSK123TN23PROD with REPORTS
                                                                              importance of engaging state, local, and tribal officials throughout




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00018   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              19

                                                                              the study process to ensure the methodology, focus, and results are
                                                                              implementable by states and communities. The Corps shall consult
                                                                              with industry groups, academia, and non-governmental organiza-
                                                                              tions who can provide specialized expertise and coordinate appro-
                                                                              priate attention and interest in the study’s design and implementa-
                                                                              tion from relevant stakeholders, including coastal state agencies,
                                                                              local officials, and private coastal scientists and engineers. The
                                                                              Committee encourages the Corps to consider near-shore marine
                                                                              habitats including coral reefs and oyster reefs, as well as the cur-
                                                                              rent and projected effects of authorized Corps environmental res-
                                                                              toration programs and projects, including South Florida Ecosystem
                                                                              Restoration, within the scope of this comprehensive study.
                                                                                 Upper Des Plaines River and Tributaries Project.—The Com-
                                                                              mittee is aware the project area was flooded with record high crests
                                                                              overflowing the Des Plaines River, resulting in damage to more
                                                                              than 3,200 residents. The Committee urges the Corps to cooperate
                                                                              with the non-Federal sponsor to advance work on the flood features
                                                                              of this project.
                                                                                 Tenkiller Ferry Lake.—Nothing in Section 204(b)(2)(H) of the
                                                                              Consolidated Appropriations Act, 2021 (Public Law 116–260) is to
                                                                              be construed as to require a water reallocation study.
                                                                                 Water Quality and Salinity Impacts on Oyster Reefs.—The Com-
                                                                              mittee encourages the Corps, when conducting or reviewing envi-
                                                                              ronmental assessments or environmental impact statements for
                                                                              navigation or coastal restoration projects in areas where oyster
                                                                              reefs exist, to consider water quality and salinity impacts on those
                                                                              reefs and, when appropriate, to mitigate any negative impacts.
                                                                                 Additional Funding.—The Corps is directed to allocate these ad-
                                                                              ditional funds in accordance with the direction in the front matter
                                                                              under the heading ‘‘Additional Funding’’. The Corps is reminded
                                                                              that activities related to innovative materials, as required under
                                                                              section 1208 of AWIA 2018, are eligible for funding under the Re-
                                                                              search and Development remaining item. The Committee urges the
                                                                              Corps to prioritize any authorized projects that would reduce flood
                                                                              risks to vulnerable communities, have been authorized based on
                                                                              their ability to reduce life safety risks, have been classified by the
                                                                              Corps as having a high risk of levee failure and life loss in the last
                                                                              five fiscal years, and whose failure would cause a release of haz-
                                                                              ardous materials from a Superfund site. Additionally, the Corps
                                                                              shall comply with the following direction in allocating funds rec-
                                                                              ommended for Investigations:
                                                                                 —When evaluating ongoing studies for funding, the Corps shall
                                                                                   consider completing or accelerating ongoing studies or initi-
                                                                                   ating new studies that will enhance the Nation’s economic de-
                                                                                   velopment, job growth, and international competitiveness; are
                                                                                   for projects located in areas that have suffered recent natural
                                                                                   disasters; are for projects that protect life and property; or are
                                                                                   for projects to address legal requirements;
                                                                                 —The Corps is urged to consider any national security benefits
                                                                                   a project may provide when allocating this funding; and
                                                                                 —The Corps shall include appropriate requests for funding in fu-
                                                                                   ture budget submissions for PED and new feasibility studies
                                                                                   initiated in fiscal year 2022. The Corps shall prepare the budg-




amozie on DSK123TN23PROD with REPORTS
                                                                                   et to reflect study completions, defined as completion of PED.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00019   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                                                 20

                                                                                                                                                  CONSTRUCTION

                                                                              Appropriations, 2021 .............................................................................                                                 $2,692,645,000
                                                                              Budget estimate, 2022 ...........................................................................                                                   1,792,378,000
                                                                              Committee recommendation .................................................................                                                          3,002,003,000
                                                                                 The Committee recommends $3,002,003,000 for Construction.
                                                                              Funding in this account is used for construction, major rehabilita-
                                                                              tion, and related activities for water resources development projects
                                                                              having navigation, flood and storm damage reduction, water sup-
                                                                              ply, hydroelectric, environmental restoration, and other attendant
                                                                              benefits to the Nation. Funds to be derived from the HMTF will be
                                                                              applied to cover the Federal share of the Dredged Material Dis-
                                                                              posal Facilities Program.
                                                                                                                              COMMITTEE RECOMMENDATION

                                                                                The table below displays the budget request and Committee’s
                                                                              recommendation for Construction:
                                                                                                                                  CORPS OF ENGINEERS–CONSTRUCTION
                                                                                                                                                   [In thousands of dollars]

                                                                                                                                                                                                            Budget                   Committee
                                                                                                                                 Project title                                                             estimate               recommendation

                                                                                                                                 ARKANSAS
                                                                              MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM, THREE RIVERS, AR ...........                                                        96,850               149,000    *
                                                                                                                                CALIFORNIA
                                                                              AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN, CA .......................................                                          156,915                156,915
                                                                              CALAVERAS COUNTY, SECTION 219, CA ........................................................................              ........................            1,300
                                                                              CITY OF NORWALK, SECTION 219, CA ............................................................................           ........................              250
                                                                              DESERT HOT SPRINGS, CA .............................................................................................    ........................              250
                                                                              HAMILTON AIRFIELD WETLANDS RESTORATION, CA .......................................................                      ........................            1,000
                                                                              MILLS MEMORIAL PARK RECYCLED WATER, SECTION 219, CA .....................................                               ........................            3,790
                                                                              NEW RIVER, IMPERIAL COUNTY, CA ...............................................................................          ........................              650
                                                                              ROSEVILLE-PCWA COOPERATIVE WATER RALIABILITY, CA .............................................                          ........................               75
                                                                              SAN JOAQUIN RIVER BASIN, LOWER SAN JOAQUIN, CA .................................................                                     15,000                15,000
                                                                              WEST SACRAMENTO, CA .................................................................................................                17,900                17,900
                                                                              WHITTIER NARROWS, CA (DAM SAFETY) ........................................................................                         219,591                219,591
                                                                                                                                 COLORADO
                                                                              SECTION 219, CROWLEY COUNTY, CO ...........................................................................             ........................            7,000
                                                                                                                                 DELAWARE
                                                                              DELAWARE COAST PROTECTION, DE ..............................................................................            ........................            1,200
                                                                              DELAWARE COAST, CAPE HENLOPEN TO FENWICK ISLAND, DE .....................................                               ........................            4,000
                                                                              DELAWARE COAST, REHOBOTH BEACH TO DEWEY BEACH, DE .....................................                                 ........................            7,650
                                                                                                                                  FLORIDA
                                                                              SOUTH FLORIDA ECOSYSTEM RESTORATION (EVERGLADES), FL ....................................                                          350,000                350,000
                                                                                                                                  GEORGIA
                                                                              SAVANNAH HARBOR EXPANSION, GA ..............................................................................                        24,000                 24,000
                                                                                                                                  ILLINOIS
                                                                              CALUMET HARBOR AND RIVER, IL AND IN .....................................................................               ........................            9,100    *
                                                                              CHICAGO SANITARY & SHIP CANAL DISPERSAL BARRIERS, IL ......................................                                          12,948                12,948
                                                                              MADISON & ST CLAIR COUNTIES, IL ..............................................................................          ........................            6,025
                                                                              UPPER MISSISSIPPI RIVER—ILLINOIS WW SYSTEM, IL, IA, MN, MO & WI ....................                                    ........................           45,100
                                                                              UPPER MISSISSIPPI RIVER RESTORATION, IL, IA, MN, MO and WI ................................                                          33,170                33,170
                                                                                                                                   INDIANA




amozie on DSK123TN23PROD with REPORTS
                                                                              INDIANA HARBOR, CONFINED DISPOSAL FACILITY, IN ....................................................                     ........................           18,395    *




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021    Jkt 045272            PO 00000            Frm 00020            Fmt 6604           Sfmt 6602           U:\SR036.XXX                SR036
                                                                                                                                                                    21
                                                                                                                        CORPS OF ENGINEERS–CONSTRUCTION—Continued
                                                                                                                                                      [In thousands of dollars]

                                                                                                                                                                                                                Budget                  Committee
                                                                                                                                   Project title                                                               estimate              recommendation

                                                                                                                                      IOWA
                                                                              MISSOURI RIVER FISH AND WILDLIFE RECOVERY, IA, KS, MO, MT, NE, ND & SD ........                                                            8,075               8,075
                                                                                                                                   LOUISIANA
                                                                              CALCASIEU RIVER AND PASS, LA ...................................................................................            ........................           9,000    *
                                                                              LOUISIANA COASTAL AREA ECOSYSTEM RESTORATION, LA ...........................................                                               6,000               6,000
                                                                              SOUTHWEST COASTAL LOUISIANA HURRICANE PROTECTION, LA ...................................                                    ........................          10,000
                                                                                                                                  MARYLAND
                                                                              ANACOSTIA WATERSHED RESTORATION, PRINCE GEORGE’S COUNTY, MD ....................                                                         30,000               30,000
                                                                              ASSATEAGUE ISLAND, MD ...............................................................................................       ........................             600    *
                                                                              CHESAPEAKE BAY ENVIRONMENTAL RESTORATION & PROTECTION, MD, VA & PA .......                                                  ........................           5,750
                                                                              CHESAPEAKE BAY OYSTER RECOVERY, MD and VA ......................................................                                           3,880               3,880
                                                                              CHESAPEAKE & OHIO CANAL, CUMBERLAND, MD & RIDGELEY, WV .............................                                        ........................             390
                                                                              MID-CHESAPEAKE BAY ISLAND, MD ...............................................................................               ........................          37,500
                                                                              POPLAR ISLAND, MD .......................................................................................................   ........................           4,200    *
                                                                                                                                   MICHIGAN
                                                                              SAULT STE MARIE (REPLACEMENT LOCK), MI ................................................................                                480,000               480,000
                                                                                                                                  MINNESOTA
                                                                              SECTION 596, ENVIRONMENTAL INFRASTRUCTURE, CITY OF BIWABIK, MN ..................                                           ........................           2,000
                                                                              SECTION 596, ENVIRONMENTAL INFRASTRUCTURE, VIRGINIA STREET, MN ...................                                          ........................           2,000
                                                                                                                                   MISSOURI
                                                                              MONARCH CHESTERFIELD, MO .......................................................................................            ........................          12,600
                                                                                                                                 NEW JERSEY
                                                                              DELWARE BAY COASTLINE, OAKWOOD BEACH, NJ .........................................................                          ........................           5,000
                                                                              GREAT EGG HARBOR INLET AND PECK BEACH, NJ ........................................................                          ........................          17,000
                                                                              RARITAN RIVER BASIN, GREEN BROOK SUB–BASIN, NJ ................................................                                          30,000               30,000
                                                                              TOWNSENDS INLET TO CAPE MAY INLET, NJ ..................................................................                    ........................          15,500
                                                                                                                                 NEW MEXICO
                                                                              ACEQUIAS ENVIRONMENTAL INFRASTRUCTURE, NM ......................................................                            ........................           9,060
                                                                                                                              NORTH CAROLINA
                                                                              CAROLINA BEACH AND VICINITY, NC .............................................................................               ........................          11,550
                                                                              WILMINGTON HARBOR, NC .............................................................................................         ........................          22,000    *
                                                                              WRIGHTSVILLE BEACH, NC .............................................................................................        ........................           9,295
                                                                                                                               NORTH DAKOTA
                                                                              PIPESTEM LAKE, ND .......................................................................................................              136,496               136,496
                                                                                                                                       OHIO
                                                                              OHIO RIVERFRONT, CINCINNATI, OH ...............................................................................             ........................             600
                                                                                                                                  OKLAHOMA
                                                                              TULSA AND WEST TULSA LEVEE SYSTEM .......................................................................                   ........................          13,789
                                                                                                                                    OREGON
                                                                              COLUMBIA RIVER AT THE MOUTH, OR & WA .................................................................                                   25,609               25,609
                                                                              WILLAMETTE RIVER AT WILLAMETTE FALLS, OR .............................................................                      ........................           6,200
                                                                                                                                PENNSYLVANIA
                                                                              UPPER OHIO NAVIGATION (MONTGOMERY LOCK), PA ....................................................                            ........................          20,100
                                                                                                                              SOUTH CAROLINA
                                                                              LAKES MARION AND MOULTRIE, SC ...............................................................................               ........................          18,000
                                                                                                                                   VERMONT




amozie on DSK123TN23PROD with REPORTS
                                                                              LAKE CHAMPLAIN BASIN (SECTION 542), VT .................................................................                    ........................           5,500




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000            Frm 00021             Fmt 6604            Sfmt 6602           U:\SR036.XXX                 SR036
                                                                                                                                                                         22
                                                                                                                          CORPS OF ENGINEERS–CONSTRUCTION—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                                                      Budget                  Committee
                                                                                                                                      Project title                                                                  estimate              recommendation

                                                                                                                                       VIRGINIA
                                                                              NORFOLK HARBOR AND CHANNELS, VA (DEEPENING) ...................................................                                               83,700                     83,700
                                                                                                                                   WASHINGTON
                                                                              COLUMBIA RIVER FISH MITIGATION, WA, OR & ID (CRFM) ............................................                                                  3,575                   38,375
                                                                              DALLES TRIBAL VILLAGE DEVELOPMENT PLAN, WA .......................................................                                ........................                1,200
                                                                              MOUNT ST HELENS SEDIMENT CONTROL, WA ................................................................                                          29,749                    29,749
                                                                              PUGET SOUND & ADAJACENT WATER RESTORATION (SPENCER ISLAND), WA ...............                                                    ........................                5,000
                                                                                                                                  WEST VIRGINIA
                                                                              SHEPHERDSTOWN WATER WORKS DISTRIBUTION SYSTEM, SECTION 571, WV ..............                                                     ........................                 1,668
                                                                              MARRTOWN SANITARY SEWER EXTENSION, SECTION 219, WV ......................................                                         ........................                 3,200
                                                                              WHEELING ELM RUN, WV ...............................................................................................              ........................                   546

                                                                                          SUBTOTAL, ITEMS UNDER STATES ....................................................................                            1,750,510                   2,205,441
                                                                                                                                REMAINING ITEMS
                                                                                                                             ADDITIONAL FUNDING
                                                                              FLOOD AND STORM DAMAGE REDUCTION ......................................................................                           ........................             154,000
                                                                                   FLOOD CONTROL ....................................................................................................           ........................              91,975
                                                                                   SHORE PROTECTION ..............................................................................................              ........................              20,000
                                                                              NAVIGATION ....................................................................................................................   ........................             190,000
                                                                                   INLAND WATERWAYS TRUST FUND REVENUES ......................................................                                  ........................              56,945
                                                                              OTHER AUTHORIZED PROJECT PURPOSES ......................................................................                          ........................              35,000
                                                                              ENVIRONMENTAL RESTORATION OR COMPLIANCE .........................................................                                 ........................              60,000
                                                                              ENVIRONMENTAL INFRASTRUCTURE ...............................................................................                      ........................              50,000
                                                                              AQUATIC PLANT CONTROL PROGRAM .............................................................................                       ........................              26,000
                                                                              BENEFICIAL USE OF DREDGED MATERIAL PILOT PROGRAM (SEC 1122) .......................                                               ........................               4,300
                                                                                   SAN FRANCISCO BAY, CA ......................................................................................                 ........................              (3600)
                                                                                                                  CONTINUING AUTHORITIES PROGRAM
                                                                              AQUATIC ECOSYSTEM RESTORATION (SECTION 206) .....................................................                                                1,000                    15,000
                                                                              BENEFICIAL USES OF DREDGED MATERIAL (SECTION 204) ...........................................                                                    1,000                    10,000        *
                                                                              EMERGENCY STREAMBANK AND SHORELINE PROTECTION (SECTION 14) .....................                                                  ........................                10,000
                                                                                   GLOUCESTER CITY SEAWALL (CAMDEN COUNTY), NJ ...........................................                                      ........................                  (100)
                                                                                   GRAND RIVER BANK STREET, CITY OF PLAINESVILLE, OH ....................................                                       ........................                (2600)
                                                                                   KANAWHA RIVER STREAMBANK STABILIZATION, WV .............................................                                     ........................                (4780)
                                                                                   MORGAN STATE UNIVERSITY SLOPE STABILIZATION, MD ......................................                                       ........................                  (100)
                                                                                   URI NARRAGANSETT EROSION PROTECTION ..........................................................                               ........................                  (150)
                                                                              FLOOD CONTROL PROJECTS (SECTION 205) ..................................................................                                          1,000                    17,000
                                                                                   LOWER SANTA CRUZ RIVER, ELOY LEVEE, AZ ......................................................                                ........................                  (100)
                                                                                   MCCORMICK WASH, GLOBE, AZ ............................................................................                       ........................                  (100)
                                                                                   RIVER ROAD, TOWN OF ROSENDALE, NY ..............................................................                             ........................                   (100)
                                                                                   ROSE AND PALM GARDEN WASHES FLOOD CONTROL PROJECT, AZ .....................                                                  ........................                  (200)
                                                                              NAVIGATION PROGRAM (SECTION 107) ..........................................................................                       ........................                  5,000
                                                                                   PORT OF MUSKEGON, MI .......................................................................................                 ........................                   (100)
                                                                                   STURGEON POINT, TOWN OF EVANS, NY ...............................................................                            ........................                  (100)
                                                                              PROJECT MODIFICATIONS FOR IMPROVEMENT OF THE ENVIRONMENT (SECTION 1135)                                                                          1,533                    11,000
                                                                              SHORE PROTECTION (SECTION 103) ..............................................................................                     ........................                  2,000
                                                                                   ROSE LARISA PARK, RI ..........................................................................................              ........................                     (50)
                                                                                   ROUNDOUT RIVERPORT, CITY OF KINGSTON, NY ..................................................                                  ........................                  (100)
                                                                                   WATCH HILL LIGHTHOUSE, RI ................................................................................                   ........................                    (50)
                                                                              DAM SAFETY AND SEEPAGE/STABILITY CORRECTION PROGRAM ...................................                                                        13,000                     13,000
                                                                              EMPLOYEES’ COMPENSATION .........................................................................................                              15,000                     15,000
                                                                              INLAND WATERWAYS USERS BOARD—BOARD EXPENSE ...............................................                                                            60                         60
                                                                              INLAND WATERWAYS USERS BOARD—CORPS EXPENSE ...............................................                                                          275                        275
                                                                              INNOVATIVE FUNDING PARTNERSHIPS ............................................................................                                   10,000        ........................
                                                                              RESTORATION OF ABANDONED MINES ...........................................................................                        ........................                  2,000
                                                                              TRIBAL PARTNERSHIP PROGRAM ....................................................................................                   ........................                  8,007




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00022              Fmt 6604            Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                     23
                                                                                                                      CORPS OF ENGINEERS–CONSTRUCTION—Continued
                                                                                                                                                      [In thousands of dollars]

                                                                                                                                                                                                               Budget           Committee
                                                                                                                                 Project title                                                                estimate       recommendation

                                                                                         SUBTOTAL .....................................................................................................           42,868           796,562

                                                                                         TOTAL ............................................................................................................    1,793,378         3,002,003
                                                                               * Includes funds requested in other lines or accounts.

                                                                                 Alternative Delivery.—The Committee continues to support alter-
                                                                              native delivery approaches such as Public Private Partnerships
                                                                              [P3s] and split delivery methods that leverage public and private
                                                                              resources to reduce costs and risk to populations by delivering in-
                                                                              frastructure sooner. The use of P3s and split delivery methods
                                                                              demonstrates a viable strategy to help address the Corps’ backlog
                                                                              of projects while reducing scheduling and funding risk to the Fed-
                                                                              eral Government. The Committee encourages the Corps to continue
                                                                              the rulemaking process for the Water Infrastructure Finance and
                                                                              Innovation Act [WIFIA]. The Corps is reminded that projects which
                                                                              use an alternative delivery approach are eligible to compete for ad-
                                                                              ditional funding recommended in this account.
                                                                                 Advanced Measures.—The Corps is encouraged to fully use the
                                                                              authorities granted to it under the Advanced Measures program to
                                                                              mitigate impacts expected to occur in the Great Lakes Basin as a
                                                                              result of record-high and near-record-high water levels.
                                                                                 Aquatic Plant Control Program.—Of the funding recommended
                                                                              for the Aquatic Plant Control Program, $1,000,000 shall be for ac-
                                                                              tivities for monitoring, surveys, and control of flowering rush and
                                                                              hydrilla. Additionally, $7,000,000 shall be for nationwide research
                                                                              and development to address invasive aquatic plants, within which
                                                                              the Corps is encouraged to support cost-shared aquatic plant man-
                                                                              agement programs. Particularly, the Corps is encouraged to evalu-
                                                                              ate and address prevention, of new infestations of hydrilla in the
                                                                              Connecticut River Basin. Finally, $15,000,000 shall be for
                                                                              watercraft inspection stations and rapid response as authorized in
                                                                              section 104 of the River and Harbor Act of 1958, equally distrib-
                                                                              uted to carry out subsections (d)(1)(A)(i), (d)(1)(A)(ii), and
                                                                              (d)(1)(A)(iii), and $3,000,000 shall be for related monitoring.
                                                                                 Barrow Alaska Coastal Erosion.—The Committee is pleased the
                                                                              Corps reprogrammed funding to continue PED work for this critical
                                                                              project in fiscal year 2021 and urges the Corps to expeditiously
                                                                              complete PED to address the significant risks to life and safety,
                                                                              threats to the community’s only drinking water source, and risks
                                                                              from contamination to the environment.
                                                                                 Beneficial Use of Dredged Material Pilot Program.—The Com-
                                                                              mittee is pleased to see the Corps’ selection of ten pilot projects
                                                                              under section 1122 of the WIIN Act to carry out beneficial use of
                                                                              dredged material including the Resilient San Francisco Bay Pilot
                                                                              project. The Committee recommends $4,300,000 for the ten pilot
                                                                              projects selected to date within the ‘‘Beneficial Use of Dredged Ma-
                                                                              terial Pilot Program.’’ The Corps is further directed to brief the
                                                                              Committee prior to any effort to solicit or select any additional pilot




amozie on DSK123TN23PROD with REPORTS
                                                                              projects as authorized by AWIA 2018.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272          PO 00000              Frm 00023               Fmt 6604             Sfmt 6602              U:\SR036.XXX        SR036
                                                                                                                              24

                                                                                 Bipartisan Budget Act [BBA] of 2018.—The Committee is frus-
                                                                              trated with the lack of urgency in completing the BBA 2018 con-
                                                                              struction projects. The purpose of the supplemental disaster fund-
                                                                              ing was to accelerate completion of high-priority flood control
                                                                              projects nationwide, including areas affected by hurricanes Harvey,
                                                                              Irma, and Maria. The Committee does not understand why the full
                                                                              cost of the project must be available before starting any construc-
                                                                              tion especially when discrete elements are ready and there are
                                                                              funds to complete them. The Corps has never been funded in this
                                                                              manner and this interpretation does not align with the intent of
                                                                              Congress—to accelerate construction. The Committee has received
                                                                              only one of the required quarterly reports on the obligation of funds
                                                                              and this lack of transparency and collaboration is unacceptable. As
                                                                              the BBA 2018 program progresses, it is possible that projects will
                                                                              not be completed within supplemental funds available; the Com-
                                                                              mittee does not intend for those projects to be delayed. The Corps
                                                                              shall brief the Committee no later than 30 days of this act enact-
                                                                              ment of this act on the status of the program and the plan for com-
                                                                              pletion of projects.
                                                                                 Bird Drive Basin Conveyance, Seepage Collection, and Re-
                                                                              charge.—The Committee acknowledges the unique opportunity for
                                                                              Miami-Dade County and the Miami-Dade Expressway Authority
                                                                              [MDX] to assist in land purchases and swaps to protect a vital
                                                                              project footprint to implement the Bird Drive Basin Conveyance,
                                                                              Seepage Collection, and Recharge concept and achieve the goals of
                                                                              the original Comprehensive Everglades Restoration Plan [CERP]
                                                                              Bird Drive Recharge Area project. The Committee encourages the
                                                                              Corps to work with the Department of the Interior and the South
                                                                              Florida Water Management District to quickly identify a consensus
                                                                              project footprint between SW 8th Street and the C–1W Canal to
                                                                              the south, immediately east of Krome Avenue, to enable Miami-
                                                                              Dade County and MDX to begin necessary land acquisitions in sup-
                                                                              port of the creation of a West Kendall Everglades Buffer and
                                                                              progress towards completing an important element of the CERP.
                                                                                 Biscayne Bay Coastal Wetlands Project.—The Committee con-
                                                                              tinues to support this vital project to protect drinking water sup-
                                                                              plies in eastern Miami-Dade County from saltwater intrusion and
                                                                              to enhance the coastal and marine ecology of Biscayne Bay and the
                                                                              offshore coral reef system. The Committee notes support from
                                                                              Miami-Dade County and the South Florida Water Management
                                                                              District to incorporate highly treated, reclaimed wastewater as an
                                                                              additional source of freshwater to assist the rehydration of these
                                                                              coastal wetlands. The Committee encourages the Corps to consider
                                                                              the incorporation of this potential source of freshwater into further
                                                                              study, design, and construction of the project and to evaluate the
                                                                              potential to use additional volumes of reclaimed wastewater to re-
                                                                              store freshwater artesian springs within the Bay through under-
                                                                              ground injection to the shallow, underlying aquifer.
                                                                                 Camp Ellis Beach, Saco, Maine.—The Committee is pleased the
                                                                              Corps has accepted a letter of support from the City of Saco mak-
                                                                              ing them the non-Federal sponsor of the Camp Ellis Project. The
                                                                              Committee directs the Secretary to finalize a Project Partnership




amozie on DSK123TN23PROD with REPORTS
                                                                              Agreement between the City of Saco and the Corps and to continue




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00024   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              25

                                                                              the collaborative effort to address the continued erosion at Camp
                                                                              Ellis Beach.
                                                                                 Caño Martin Peña Ecosystem Restoration Project, San Juan,
                                                                              Puerto Rico.—The Committee renews its focus on the Caño Martin
                                                                              Peña Ecosystem Restoration Project planned for urban San Juan,
                                                                              Puerto Rico. The Committee continues to recognize the significance
                                                                              of this project for the economic revitalization, public health, and in-
                                                                              cidental flood protection of the eight surrounding communities.
                                                                              This historically important tidal channel will re-establish the nat-
                                                                              ural tidal exchange between the San Jose Lagoon and the San
                                                                              Juan Bay, two bodies of water with ecologically significant habitat
                                                                              for native species and ecosystem function. The Committee further
                                                                              recognizes the substantial time and effort dedicated across the past
                                                                              three decades by the non-Federal sponsor to plan this project in co-
                                                                              ordination with the Corps and the meaningful progress made in re-
                                                                              cent years to secure its authorization and ready it for the construc-
                                                                              tion phase. The Committee is concerned over lost opportunities and
                                                                              delays arising with the absence of funds being allocated to start
                                                                              construction of this critical project. Accordingly, the Committee en-
                                                                              courages the Corps to prioritize funding for this project in future
                                                                              budget requests and to work with the non-Federal sponsor to ad-
                                                                              vance the project to the next phase at the earliest practicable op-
                                                                              portunity.
                                                                                 Central Everglades Planning Project [CEPP].—The Committee
                                                                              recognizes the importance of restoring America’s Everglades, and
                                                                              urges the Corps to expedite the required validation reports for PPA
                                                                              North and PPA New Water, and to begin design and construction
                                                                              of components for PPA South and PPA New Water as soon as prac-
                                                                              ticable to complement the efforts of the South Florida Water Dis-
                                                                              trict. The Committee urges the Corps to design and construct the
                                                                              recently-authorized Everglades Agricultural Area Storage Reservoir
                                                                              as quickly as possible to utilize the expanded water delivery capa-
                                                                              bilities of completed PPA South elements.
                                                                                 Central and South Florida Project.—The Committee recognizes
                                                                              the importance of the Central and South Florida Project and urges
                                                                              the Corps to maintain continued attention to the need of the South
                                                                              Florida economy and environment for a functioning flood control
                                                                              system.
                                                                                 Chesapeake Bay Comprehensive Water Resources Restoration
                                                                              Plan and Oyster Recovery.—The Committee supports the Corps’
                                                                              Chesapeake Bay Comprehensive Water Resources and Restoration
                                                                              Plan and the Chesapeake Bay Oyster Recovery Program and en-
                                                                              courages the Corps to provide sufficient funding in future budget
                                                                              requests and the fiscal year 2022 work plan.
                                                                                 Chicago Sanitary and Ship Canal Dispersal Barrier, Illinois.—
                                                                              No funds recommended in this act may be used for construction of
                                                                              hydrologic separation measures.
                                                                                 CERP–Indian River Lagoon-South.—The Committee recognizes
                                                                              the importance of restoring America’s Everglades, and the chal-
                                                                              lenge of balancing discharges from Lake Okeechobee and harmful
                                                                              algal blooms in the St. Lucie River and Indian River Lagoon. The
                                                                              Committee urges the Corps to move on the final construction of the
                                                                              C–44 Reservoir and to expedite design work on the C–23 and C–




amozie on DSK123TN23PROD with REPORTS
                                                                              24 Reservoirs that, along with the C–44 Reservoir, will serve as




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00025   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              26

                                                                              crucial elements of the Indian River Lagoon-South CERP project to
                                                                              collect and clean discharges and runoff before they enter the La-
                                                                              goon.
                                                                                 Columbia River Treaty.—The Corps is directed to brief, in a clas-
                                                                              sified setting and in coordination with the Department of State,
                                                                              within 60 days after enactment of this act on the execution plan
                                                                              for post-fiscal year 2023 for flood control operations as dictated by
                                                                              the modernized agreement. Further, not later than 90 days after
                                                                              enactment of this act the Corps shall provide a classified detailed
                                                                              assessment, in coordination with Department of State, of its fund-
                                                                              ing requirements and plan for post-fiscal year 2023 for flood control
                                                                              operations as dictated by the Columbia River Treaty.
                                                                                 Construction Funding Schedules.—A complete and reliable cost
                                                                              estimate with an out-year funding schedule is essential to under-
                                                                              standing current funding and future funding requirements within
                                                                              the Corps’ construction portfolio. A comprehensive outlook of these
                                                                              dynamic requirements is necessary for Congress to consider and
                                                                              balance funding allocations annually, and to assess the long-term
                                                                              effects of new investment decisions. Therefore, within 90 days of
                                                                              enactment of this act and annually thereafter, the Chief of Engi-
                                                                              neers shall submit directly to the Committee on Appropriations of
                                                                              both houses of Congress, a breakdown, by fiscal year, of the full
                                                                              and efficient Federal funding needs for each ongoing construction
                                                                              project in the Corps’ Civil Works program. For each project identi-
                                                                              fied, the Corps shall also provide the total project cost with a
                                                                              breakdown between the Federal and non-Federal costs, and any ap-
                                                                              plicable authorization ceiling. For the purposes of this report, an
                                                                              active project shall mean any project which has received construc-
                                                                              tion account appropriations, including those funded in a supple-
                                                                              mental, and has remaining costs to be funded from the Construc-
                                                                              tion account. These funding requirements shall be based on tech-
                                                                              nical construction sequencing, and realistic workflow and shall not
                                                                              be altered to reflect administrative policies and priorities or any as-
                                                                              sumed limitation on funding available.
                                                                                 Continuing Authorities Program.—The Committee recommends
                                                                              $70,000,000 for the Continuing Authorities Program [CAP]. CAP is
                                                                              a useful tool for the Corps to undertake small localized projects
                                                                              without being encumbered by the lengthy study and authorization
                                                                              phases typical of most Corps projects. The management of CAP
                                                                              shall continue consistent with direction provided in previous fiscal
                                                                              years.
                                                                                 The Corps shall allow for the advancement of flood control
                                                                              projects in combination with ecological benefits using natural and
                                                                              nature-based solutions alone, or in combination with, built infra-
                                                                              structure where appropriate for reliable risk reduction during the
                                                                              development of projects under section 205 of CAP. Additionally,
                                                                              within the section 1135 CAP authority, and to the extent already
                                                                              authorized by law, the Committee encourages the Corps to consider
                                                                              projects that restore degraded wetland habitat and stream habitat
                                                                              impacted by construction of Corps levees with executed Feasibility
                                                                              Cost Share Agreements.
                                                                                 Environmental Infrastructure.—Authorized Environmental Infra-
                                                                              structure projects shall not require a new start designation. This




amozie on DSK123TN23PROD with REPORTS
                                                                              includes projects in regional authorities that have not received




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00026   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              27

                                                                              funding and projects authorized under section 219 of the WRDA of
                                                                              1992 (Public Law 102–580), as amended. The Committee reminds
                                                                              the Corps that Environmental Infrastructure authorities include
                                                                              caps on Federal participation, but do not provide a guarantee that
                                                                              the project authorization level will be met. Environmental Infra-
                                                                              structure projects shall only receive funding if there is a separable
                                                                              element that can be funded to completion in a fiscal year without
                                                                              the requirement for continued funding in future years.
                                                                                 Howard Hanson Dam—Additional Water Storage Project
                                                                              [HAHD–AWSP].—The Committee supports continued efforts to
                                                                              fully implement the jeopardy Biological Opinion (BiOp) deter-
                                                                              mining the impact of ongoing operations of Howard Hanson Dam,
                                                                              including the HAHD–AWSP on ESA-listed species, and specifically
                                                                              the ongoing work to construct a downstream fish passage facility.
                                                                                 Innovative Funding Partnerships Program.—The budget request
                                                                              includes $10,000,000 for an Innovative Funding Partnerships Pro-
                                                                              gram to be used along with funds from non-Federal interests ‘‘in
                                                                              excess of the non-Federal sponsor’s statutory cost share require-
                                                                              ments’’ to accelerate certain authorized projects. The Committee is
                                                                              troubled by what appears to be an avenue to circumvent the per-
                                                                              formance based budgeting approach the Corps uses to evaluate
                                                                              projects. It is unclear how equity will be maintained if funding in
                                                                              excess of legally required cost share is used as a criterion for fund-
                                                                              ing decisions allowing non-Federal sponsors to contribute funds
                                                                              and jump the line is contrary to long-standing congressional direc-
                                                                              tion. The Committee recommends no funds for this proposal. The
                                                                              Committee notes, however, that any project that could have re-
                                                                              ceived funding under such a program is eligible to compete for the
                                                                              additional funding provided in this account based on the project
                                                                              performance criteria described in this report.
                                                                                 Lake Champlain Watershed.—The Lake Champlain Watershed is
                                                                              an officially designated resource of national significance that spans
                                                                              the States of New York and Vermont and into Canada. The Com-
                                                                              mittee reminds the Corps that section 542 of WRDA of 2000 (Public
                                                                              Law 106–541) as amended, authorizes the Corps to provide assist-
                                                                              ance to non-Federal interests to address a range of environmental
                                                                              issues in the Lake Champlain Watershed in Vermont and New
                                                                              York.
                                                                                 New Savannah Bluff Lock and Dam, Georgia and South Caro-
                                                                              lina.—The Committee maintains interest in the New Savannah
                                                                              Bluff Lock and Dam and recognizes the long standing challenges
                                                                              of the project. The Committee encourages the Corps to work with
                                                                              all stakeholders towards a mutually beneficial resolution that will
                                                                              ensure waters levels for existing activities and functions are main-
                                                                              tained, as detailed in section 1319 of the WIIN Act.
                                                                                 Non-Federal Implementation Pilot Program.—Due to ongoing
                                                                              concerns initially expressed in the fiscal year 2020 Senate Report,
                                                                              the Corps shall notify the Committee upon receiving any proposal
                                                                              from a non-Federal interest requesting to utilize the section
                                                                              1043(b) of WRRDA authority. The Corps shall not negotiate or
                                                                              enter into a project partnership agreement to transfer funds to a
                                                                              non-Federal interest utilizing this authority unless approval is re-
                                                                              ceived from the Committee on Appropriations of both Houses of




amozie on DSK123TN23PROD with REPORTS
                                                                              Congress. None of the funds recommended in this act shall be used




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00027   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              28

                                                                              under this authority for a project where construction has been
                                                                              started but not completed. The Corps shall brief the Committees
                                                                              not later than 45 days after enactment of this act on activities car-
                                                                              ried out under the section 1043 pilot program, including the Corps’
                                                                              implementation guidance and any existing or potential agreements.
                                                                                 Prioritization of Projects in Drought-Stricken Areas.—The Com-
                                                                              mittee urges the Corps to prioritize any authorized projects that
                                                                              would alleviate water supply issues in areas that have been af-
                                                                              flicted by severe droughts in the last four fiscal years, to include
                                                                              projects focused on the treatment of brackish water.
                                                                                 South Florida Ecosystem Restoration [SFER].—For fiscal year
                                                                              2022, the Committee directs the Corps to make publicly available
                                                                              a comprehensive snapshot of all SFER cost share accounting down
                                                                              to the project level and directs the Corps to ensure the accuracy of
                                                                              all budget justification sheets that inform SFER Integrated Finan-
                                                                              cial Plan documents by September 30, 2022.
                                                                                 The Dalles Dam, Tribal Housing.—The Committee is aware that
                                                                              the work on the Village Development Plan is partially complete.
                                                                              The Corps is encouraged to complete the Village Development Plan
                                                                              in consultation with affected Columbia River tribes and the Bureau
                                                                              of Indian Affairs.
                                                                                 Tulsa and West-Tulsa Levee System [TWTLS].—The Committee
                                                                              recognizes that TWTLS-protected area is home to a substantial
                                                                              population of elderly and low income residents, and the TWTLS
                                                                              was classified by the Corps as a high risk of failure and life loss
                                                                              in 2019. Therefore, the Committee has provided additional funding
                                                                              and urges the Corps to expeditiously continue progress on this crit-
                                                                              ical project.
                                                                                 Upper Mississippi River Restoration Program [UMRR], Quincy
                                                                              Bay.—Over the past 70 years, river traffic has led to the environ-
                                                                              mental degradation of Quincy Bay. Therefore the Committee en-
                                                                              courages the Corps to prioritize the environmental restoration
                                                                              project in Quincy Bay near Quincy, Illinois as a Tier 1 project for
                                                                              immediate commencement through the UMMR Program.
                                                                                 Upper St. Anthony Falls.—The Committee is concerned that the
                                                                              Corps is attempting to divest the entire Federal project at once and
                                                                              encourages the Corps to continue to operate and maintain the lock.
                                                                              The Corps is further reminded that the Upper St. Anthony Falls
                                                                              project remains an authorized Federal project until there is a will-
                                                                              ing non-Federal partner for the disposition study.
                                                                                 Additional Funding.—The Corps shall allocate these additional
                                                                              funds in accordance with the direction in the front matter under
                                                                              the heading ‘‘Additional Funding’’. The Corps shall not condition
                                                                              these funds, or any funds appropriated in this act, on a non-Fed-
                                                                              eral interest paying more than their required share in any phase
                                                                              of a project. Of the additional funds recommended in this account
                                                                              for flood and storm damage reduction, navigation, and other au-
                                                                              thorized project purposes (excluding environmental infrastructure),
                                                                              the Corps shall allocate not less than $35,000,000 to authorized re-
                                                                              imbursements for projects with executed project partnership agree-
                                                                              ments and that have completed construction or where non-Federal
                                                                              sponsors intend to use the funds for additional water resource de-
                                                                              velopment activities. Of the additional funding provided in this ac-




amozie on DSK123TN23PROD with REPORTS
                                                                              count for environmental restoration or compliance and other au-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00028   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              29

                                                                              thorized project purposes, the Corps shall allocate not less than
                                                                              $25,000,000 for multistate ecosystem restoration programs for
                                                                              which a comprehensive restoration plan is in development or has
                                                                              been completed. Of the additional funding recommended in this ac-
                                                                              count for flood and storm damage reduction and flood control, the
                                                                              Corps shall allocate not less than $25,558,000 to continue construc-
                                                                              tion of projects that principally address drainage in urban areas.
                                                                                 When allocating the additional funding provided in this account,
                                                                              the Corps is encouraged to evaluate authorized reimbursements in
                                                                              the same manner as if the projects were being evaluated for new
                                                                              or ongoing construction and shall consider giving priority to the fol-
                                                                              lowing:
                                                                                 —Benefits of the funded work to the national economy;
                                                                                 —Extent to which the work will enhance national, regional, or
                                                                                    local economic development;
                                                                                 —Number of jobs created directly by the funded activity;
                                                                                 —Ability to obligate the funds allocated within the calendar year,
                                                                                    including consideration of the ability of the non-Federal spon-
                                                                                    sor to provide any required cost share;
                                                                                 —Ability to complete the project, separable element, or project
                                                                                    phase with the funds allocated;
                                                                                 —Legal requirements, including responsibilities to Tribes;
                                                                                 —For flood and storm damage reduction projects (including au-
                                                                                    thorized nonstructural measures and periodic beach renourish-
                                                                                    ments): Population, safety of life, economic activity, or public
                                                                                    infrastructure at risk, as appropriate; the severity of risk of
                                                                                    flooding or the frequency with which an area has experienced
                                                                                    flooding; and preservation of historically significant commu-
                                                                                    nities, culture, and heritage;
                                                                                 —For shore protection projects, projects in areas where there is
                                                                                    risk to life and public health and safety, and risk of environ-
                                                                                    mental contamination;
                                                                                 —For navigation projects, the number of jobs or level of economic
                                                                                    activity to be supported by completion of the project, separable
                                                                                    element, or project phase;
                                                                                 —For projects cost shared with the IWTF, the economic impact
                                                                                    on the local, regional, and national economy if the project is
                                                                                    not funded, as well as discrete elements of work that can be
                                                                                    completed within the funding provided in this line item;
                                                                                 —For other authorized project purposes and environmental res-
                                                                                    toration or compliance projects, the beneficial use of dredged
                                                                                    material; and
                                                                                 —For environmental infrastructure, projects in rural commu-
                                                                                    nities, projects with greater economic impact, projects in coun-
                                                                                    ties or parishes with high poverty rates, projects owed past re-
                                                                                    imbursements, and projects that provide backup raw water
                                                                                    supply in the event of an emergency.
                                                                                 The Committee recommendation includes the full use of all esti-
                                                                              mated fiscal year 2022 annual revenues in the IWTF to ensure on-
                                                                              going construction projects proceed with an efficient funding pro-
                                                                              file. Funds recommended herein for inland waterways shall only be
                                                                              available for ongoing construction projects. The Corps shall allocate
                                                                              all funds recommended in the IWTF Revenues remaining item




amozie on DSK123TN23PROD with REPORTS
                                                                              along with the statutory cost share from funds provided in the




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00029   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                                                        30

                                                                              Navigation line item prior to allocating the remainder of funds in
                                                                              the Navigation line item.
                                                                                                                           MISSISSIPPI RIVER AND TRIBUTARIES

                                                                              Appropriations, 2021 .............................................................................                                                          $380,000,000
                                                                              Budget estimate, 2022 ...........................................................................                                                            269,688,000
                                                                              Committee recommendation .................................................................                                                                   380,000,000
                                                                                The Committee recommends $380,000,000 for Mississippi River
                                                                              and Tributaries. Funds recommended in this account are for plan-
                                                                              ning, construction, and operation and maintenance activities asso-
                                                                              ciated with water resource projects located in the lower Mississippi
                                                                              River Valley from Cape Girardeau, Missouri to the Gulf of Mexico.
                                                                                The table below displays the budget request and Committee’s
                                                                              recommendation:
                                                                                                                                        MISSISSIPPI RIVER AND TRIBUTARIES
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                                                     Budget                  Committee
                                                                                                                                          Item                                                                      estimate              recommendation

                                                                                                                                 INVESTIGATIONS
                                                                              RUNNING REELFOOT BAYOU, TN ....................................................................................                                   600                 600

                                                                                              SUBTOTAL, INVESTIGATIONS .........................................................................                                600                 600
                                                                                                                                 CONSTRUCTION
                                                                              LOWER MISSISSIPPI RIVER MAIN STEM (LMRMS) ..........................................................                                               800                800
                                                                              CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN ...............................................                                              14,300               14,300
                                                                              MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS, MO and TN ........................................                                              17,450               17,450
                                                                              MORGANZA TO THE GULF, LA .........................................................................................               ........................          19,333
                                                                              YAZOO BASIN, DELTA HEADWATERS, MS .......................................................................                        ........................          12,900
                                                                              YAZOO BASIN, UPPER YAZOO, MS .................................................................................                   ........................          12,000
                                                                              YAZOO BASIN, YAZOO BACKWATER AREA, MS ...............................................................                            ........................          20,750

                                                                                              SUBTOTAL, CONSTRUCTION ..........................................................................                             32,550               97,533
                                                                                                                      OPERATION AND MAINTENANCE
                                                                              LOWER MISSISSIPPI RIVER MAIN STEM (LMRMS) ..........................................................                                          30,922               30,922
                                                                              CHANNEL IMPROVEMENT, AR, IL, KY, LA, MS, MO & TN ...............................................                                              77,500               77,500
                                                                              MISSISSIPPI RIVER LEVEES, AR, IL, KY, LA, MS, MO &TN .............................................                                            11,593               11,593
                                                                              BAYOU METO BASIN, AR ................................................................................................            ........................          24,000
                                                                              GRAND PARAIRIE REGION, AR ........................................................................................               ........................          13,000
                                                                              HELENA HARBOR, PHILLIPS COUNTY, AR .......................................................................                       ........................             540    *
                                                                              INSPECTION OF COMPLETED WORKS, AR .......................................................................                        ........................             252    †
                                                                              LOWER ARKANSAS RIVER, NORTH BANK, AR .................................................................                                               75                75
                                                                              LOWER ARKANSAS RIVER, SOUTH BANK, AR .................................................................                                               40                40
                                                                              RED–OUACHITA RIVER BASIN LEVEES, AR &LA .............................................................                                                87                87
                                                                              ST FRANCIS BASIN, AR & MO ........................................................................................                              9,600               9,600
                                                                              TENSAS BASIN, BOEUF AND TENSAS RIVERS, AR & LA .................................................                                                2,455               2,455
                                                                              WHITE RIVER BACKWATER, AR .......................................................................................                               1,100               1,100
                                                                              INSPECTION OF COMPLETED WORKS, IL ........................................................................                       ........................              20    †
                                                                              INSPECTION OF COMPLETED WORKS, KY .......................................................................                        ........................              35    †
                                                                              BAYOU COCODRIE AND TRIBUTARIES, LA ......................................................................                                            48                48
                                                                              INSPECTION OF COMPLETED WORKS, LA .......................................................................                        ........................           3,952    †
                                                                              LOWER RED RIVER, SOUTH BANK LEVEES, LA ...............................................................                                             140                140
                                                                              MISSISSIPPI DELTA REGION, LA .....................................................................................                              1,940               1,940
                                                                              OLD RIVER, LA ................................................................................................................                52,020               52,020
                                                                              TENSAS BASIN, RED RIVER BACKWATER, LA .................................................................                                         2,990               2,990
                                                                              GREENVILLE HARBOR, MS ..............................................................................................             ........................             932    *
                                                                              INSPECTION OF COMPLETED WORKS, MS ......................................................................                         ........................             202    †
                                                                              VICKSBURG HARBOR, MS ...............................................................................................             ........................             942    *
                                                                              YAZOO BASIN, ARKABUTLA LAKE, MS ............................................................................                                    6,070               6,070




amozie on DSK123TN23PROD with REPORTS
                                                                              YAZOO BASIN, BIG SUNFLOWER RIVER, MS ...................................................................                                           224                224




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00030              Fmt 6604            Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                         31
                                                                                                                             MISSISSIPPI RIVER AND TRIBUTARIES—Continued
                                                                                                                                                          [In thousands of dollars]

                                                                                                                                                                                                                       Budget                  Committee
                                                                                                                                           Item                                                                       estimate              recommendation

                                                                              YAZOO BASIN, ENID LAKE, MS .......................................................................................                                5,362                     5,362
                                                                              YAZOO BASIN, GREENWOOD, MS ....................................................................................                                      365                      365
                                                                              YAZOO BASIN, GRENADA LAKE, MS ................................................................................                                    5,482                     5,482
                                                                              YAZOO BASIN, MAIN STEM, MS ......................................................................................                                    900                      900
                                                                              YAZOO BASIN, SARDIS LAKE, MS ...................................................................................                                  7,632                     7,632
                                                                              YAZOO BASIN, TRIBUTARIES, MS ...................................................................................                                     450                      450
                                                                              YAZOO BASIN, WILL M WHITTINGTON AUX CHAN, MS ....................................................                                                    290                      290
                                                                              YAZOO BASIN, YAZOO BACKWATER AREA, MS ...............................................................                                                727                      727
                                                                              YAZOO BASIN, YAZOO CITY, MS .....................................................................................                                    450                      450
                                                                              INSPECTION OF COMPLETED WORKS, MO ......................................................................                           ........................                   136        †
                                                                              WAPPAPELLO LAKE, MO ..................................................................................................                            6,863                     6,863
                                                                              INSPECTION OF COMPLETED WORKS, TN .......................................................................                          ........................                    28        †
                                                                              MEMPHIS HARBOR, MCKELLAR LAKE, TN .......................................................................                          ........................                 2,338        *

                                                                                              SUBTOTAL, OPERATION AND MAINTENANCE .................................................                                         225,325                   271,702
                                                                                                                                REMAINING ITEMS
                                                                              ADDITIONAL FUNDING FOR ONGOING WORK ...................................................................                            ........................                  3,667
                                                                              DREDGING .......................................................................................................................   ........................   ........................
                                                                              FLOOD CONTROL .............................................................................................................        ........................   ........................
                                                                              OTHER AUTHORIZED PURPOSES .....................................................................................                    ........................   ........................
                                                                              COLLECTION AND STUDY OF BASIC DATA ......................................................................                                         6,498                      6,498
                                                                              MISSISSIPPI RIVER COMMISSION ...................................................................................                                       90     ........................
                                                                              INSPECTION OF COMPLETED WORKS, AR, IL, KY, LA, MS, MO AND TN .........................                                                            4,625       ........................

                                                                                              SUBTOTAL, REMAINING ITEMS ......................................................................                               11,213                     10,165

                                                                                          TOTAL, MISSISSIPPI RIVER AND TRIBUTARIES ..................................................                                       269,688                   380,000          †
                                                                                 * Includes funds requested in other accounts.
                                                                                 † Includes funds requested in remaining items.

                                                                                Lower Mississippi River Main Stem.—The budget request pro-
                                                                              poses to consolidate several activities across multiple States into
                                                                              one line item. The Committee rejects this change and instead rec-
                                                                              ommends continuing to fund these activities as separate line items.
                                                                                Additional Funding for Ongoing Work.—When allocating the ad-
                                                                              ditional funding recommended in this account, the Corps shall con-
                                                                              sider giving priority to completing or accelerating ongoing work
                                                                              that will enhance the Nation’s economic development, job growth,
                                                                              and international competitiveness, or to studies or projects located
                                                                              in areas that have suffered recent natural disasters. The Corps
                                                                              shall use such sums as are necessary to carry out remaining
                                                                              unconstructed features of projects authorized by law, in response to
                                                                              recent flood disasters. While this funding is shown under remain-
                                                                              ing items, the Corps shall use these funds in investigations, con-
                                                                              struction, and operation and maintenance, as applicable.
                                                                                The Committee recognizes the importance of erosion control in
                                                                              headwater streams and tributaries, and the environmental, water
                                                                              quality, and sediment reduction benefits it provides downstream.
                                                                              When allocating additional funds recommended in this account, the
                                                                              Corps is directed to give adequate consideration to cooperative
                                                                              projects addressing watershed erosion, sedimentation, flooding, and
                                                                              environmental degradation. Of the additional funds recommended
                                                                              in this account, the Corps shall allocate not less than $3,000,000




amozie on DSK123TN23PROD with REPORTS
                                                                              for dredging of ports and harbors.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00031              Fmt 6604             Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                       32

                                                                                                                                 OPERATION AND MAINTENANCE

                                                                              Appropriations, 2021 .............................................................................                                                         $3,849,655,000
                                                                              Budget estimate, 2022 ...........................................................................                                                           2,502,901,000
                                                                              Committee recommendation .................................................................                                                                  4,682,797,000
                                                                                The Committee recommends $4,682,797,000 for Operation and
                                                                              Maintenance. Funding in this account is used to fund operations,
                                                                              maintenance, and related activities at water resource projects that
                                                                              the Corps operates and maintains. These activities include dredg-
                                                                              ing, repair, and operation of structures and other facilities, as au-
                                                                              thorized in the various river and harbor, flood control, and water
                                                                              resources development acts. Related activities include aquatic plant
                                                                              control, monitoring of completed projects where appropriate, re-
                                                                              moval of sunken vessels, and the collection of domestic waterborne
                                                                              commerce statistics.
                                                                                                                                 COMMITTEE RECOMMENDATION

                                                                                The table below displays the budget request and Committee’s
                                                                              recommendation for Operation and Maintenance:
                                                                                                                      CORPS OF ENGINEERS—OPERATION AND MAINTENANCE
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                             Committee
                                                                                                                                         Item                                                                 Budget estimate             recommendation

                                                                                                                                     ALABAMA
                                                                              ALABAMA RIVER LAKES, AL ............................................................................................                         15,252                23,632
                                                                              BAYOU CODEN, AL ..........................................................................................................      ........................            3,000
                                                                              BAYOU LA BATRE, AL .....................................................................................................        ........................            5,008    *
                                                                              BLACK WARRIOR AND TOMBIGBEE RIVERS, AL .............................................................                                         24,652                27,852
                                                                              BON SECOUR RIVER, AL .................................................................................................          ........................            4,493
                                                                              DAUPHIN ISLAND BAY, AL ..............................................................................................           ........................            3,000
                                                                              GULF INTRACOASTAL WATERWAY, AL .............................................................................                                   6,745                6,745
                                                                              INSPECTION OF COMPLETED WORKS, AL .......................................................................                       ........................              180    †
                                                                              MOBILE HARBOR, AL ......................................................................................................        ........................           63,212    *
                                                                              PERDIDO PASS CHANNEL, AL .........................................................................................              ........................            2,000    *
                                                                              PROJECT CONDITION SURVEYS, AL ................................................................................                  ........................              150    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, AL ....................................................................                        ........................               85    †
                                                                              TENNESSEE—TOMBIGBEE WATERWAY WILDLIFE MITIGATION, AL & MS .......................                                                              1,800                1,800
                                                                              TENNESSEE—TOMBIGBEE WATERWAY, AL & MS ..........................................................                                             28,986                32,986
                                                                              WALTER F GEORGE LOCK AND DAM, AL & GA ...............................................................                                        10,676                10,676
                                                                              WATER/ENVIRONMENTAL CERTIFICATION, AL .................................................................                         ........................               90    *
                                                                                                                                       ALASKA
                                                                              ANCHORAGE HARBOR, AK ..............................................................................................             ........................           11,370    *
                                                                              CHENA RIVER LAKES FLOOD CONTROL PROJECT, NORTH POLE, AK ..............................                                                         6,921                6,921
                                                                              DILLINGHAM HARBOR, AK ...............................................................................................           ........................            1,055    *
                                                                              ELFIN COVE, AK ..............................................................................................................   ........................            2,660    *
                                                                              HOMER HARBOR, AK ......................................................................................................         ........................              785    *
                                                                              INSPECTION OF COMPLETED WORKS, AK .......................................................................                       ........................              200    †
                                                                              LOWELL CREEK TUNNELL (SEWARD), AK ........................................................................                                          75                 75
                                                                              NINILCHIK HARBOR, AK ..................................................................................................         ........................              665    *
                                                                              NOME HARBOR, AK .........................................................................................................       ........................            2,434    *
                                                                              PROJECT CONDITION SURVEYS, AK ................................................................................                  ........................              750    *
                                                                                                                               AMERICAN SAMOA
                                                                              ANUU HARBOR, AS .........................................................................................................       ........................            2,921    *
                                                                                                                                      ARIZONA
                                                                              ALAMO LAKE, AZ .............................................................................................................                   1,600                1,600
                                                                              INSPECTION OF COMPLETED WORKS, AZ .......................................................................                       ........................              175    †




amozie on DSK123TN23PROD with REPORTS
                                                                              PAINTED ROCK DAM, AZ .................................................................................................                         1,936                1,936




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00032             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                      33
                                                                                                         CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                                                                                           Committee
                                                                                                                                         Item                                                                Budget estimate            recommendation

                                                                              SCHEDULING RESERVOIR OPERATIONS, AZ ....................................................................                       ........................             112    †
                                                                              WHITLOW RANCH DAM, AZ .............................................................................................                              445                445
                                                                                                                                    ARKANSAS
                                                                              BEAVER LAKE, AR ...........................................................................................................                   8,956               8,956
                                                                              BLAKELY MT DAM, LAKE OUACHITA, AR .........................................................................                                   7,460               7,460
                                                                              BLUE MOUNTAIN LAKE, AR .............................................................................................                          1,998               1,998
                                                                              BULL SHOALS LAKE, AR .................................................................................................                        9,525               9,525
                                                                              DEGRAY LAKE, AR ..........................................................................................................                    6,587               6,587
                                                                              DEQUEEN LAKE, AR ........................................................................................................                     1,846               1,846
                                                                              DIERKS LAKE, AR ............................................................................................................                  1,488               1,488
                                                                              GILLHAM LAKE, AR .........................................................................................................                    1,430               1,430
                                                                              GREERS FERRY LAKE, AR ...............................................................................................                         7,947               7,947
                                                                              HELENA HARBOR, PHILLIPS COUNTY, AR .......................................................................                     ........................             540    *
                                                                              INSPECTION OF COMPLETED WORKS, AR .......................................................................                      ........................             929    †
                                                                              MCCLELLAN–KERR ARKANSAS RIVER NAVIGATION SYSTEM, AR ....................................                                                    56,136               56,136
                                                                              MILLWOOD LAKE, AR ......................................................................................................                      2,831               2,831
                                                                              NARROWS DAM, LAKE GREESON, AR .............................................................................                                   5,691               5,691
                                                                              NIMROD LAKE, AR ..........................................................................................................                    2,267               2,267
                                                                              NORFORK LAKE, AR ........................................................................................................                     6,572               6,572
                                                                              OSCEOLA HARBOR, AR ...................................................................................................         ........................              15    *
                                                                              OUACHITA AND BLACK RIVERS, AR & LA .......................................................................                                  12,065               12,065
                                                                              PROJECT CONDITION SURVEYS .......................................................................................              ........................               5    *
                                                                              WHITE RIVER, AR ............................................................................................................                       25                25
                                                                              YELLOW BEND PORT, AR ................................................................................................          ........................             127    *
                                                                                                                                   CALIFORNIA
                                                                              BLACK BUTTE LAKE, CA .................................................................................................                        6,400               6,400
                                                                              BUCHANAN DAM, HV EASTMAN LAKE, CA ......................................................................                                      2,295               2,295
                                                                              CHANNEL ISLANDS HARBOR, CA ....................................................................................                ........................          15,016    *
                                                                              COYOTE VALLEY DAM, LAKE MENDOCINO, CA ...............................................................                                         8,200               8,200
                                                                              DRY CREEK (WARM SPRINGS) LAKE AND CHANNEL, CA ...............................................                                                 9,524               9,524
                                                                              FARMINGTON DAM, CA ...................................................................................................                           525                525
                                                                              HIDDEN DAM, HENSLEY LAKE, CA ..................................................................................                               7,495               7,495
                                                                              HUMBOLDT HARBOR AND BAY, CA ................................................................................                   ........................           4,700    *
                                                                              INSPECTION OF COMPLETED WORKS, CA .......................................................................                      ........................           3,410    †
                                                                              ISABELLA LAKE, CA ........................................................................................................                    3,440               3,440
                                                                              LOS ANGELES COUNTY DRAINAGE AREA, CA .................................................................                                      20,220               20,220
                                                                              MERCED COUNTY STREAMS, CA ....................................................................................                                   835                835
                                                                              MOJAVE RIVER DAM, CA .................................................................................................                        1,101               1,101
                                                                              MORRO BAY HARBOR, CA ..............................................................................................            ........................           3,600    *
                                                                              NAPA RIVER, CA .............................................................................................................   ........................           4,750    *
                                                                              NEW HOGAN LAKE, CA ....................................................................................................                       6,390               6,390
                                                                              NEW MELONES LAKE, DOWNSTREAM CHANNEL, CA .......................................................                                              2,480               2,480
                                                                              OAKLAND HARBOR, CA ...................................................................................................         ........................          25,634    *
                                                                              OCEANSIDE HARBOR, CA ................................................................................................          ........................           1,790    *
                                                                              PINE FLAT LAKE, CA .......................................................................................................                    3,930               3,930
                                                                              PROJECT CONDITION SURVEYS, CA ................................................................................                 ........................             840    *
                                                                              RICHMOND HARBOR, CA ................................................................................................           ........................          13,179    *
                                                                              SACRAMENTO RIVER (30 FOOT PROJECT), CA ...............................................................                         ........................           3,875    *
                                                                              SACRAMENTO RIVER AND TRIBUTARIES (DEBRIS CONTROL), CA ..................................                                                         990                990    *
                                                                              SACRAMENTO RIVER (SHALLOW DRAFT CHANNEL), CA .................................................                                 ........................             190    *
                                                                              SAN FRANCISCO BAY DELTA MODEL STRUCTURE, CA ...................................................                                               1,018               1,018    ...
                                                                              SAN FRANCISCO BAY LONG TERM MANAGEMENT STRATEGY (LTMS), CA .....................                                               ........................             450    *
                                                                              SAN FRANCISCO HARBOR AND BAY, CA (DRIFT REMOVAL) ...........................................                                   ........................           3,883    *
                                                                              SAN FRANCISCO HARBOR, CA ........................................................................................              ........................           5,275    *
                                                                              SAN JOAQUIN RIVER (PORT OF STOCKTON), CA .............................................................                         ........................           7,425    *
                                                                              SAN PABLO BAY AND MARE ISLAND STRAIT, CA ...........................................................                           ........................             600    *
                                                                              SAN RAFAEL CREEK, CA .................................................................................................         ........................           6,750    *
                                                                              SANTA ANA RIVER BASIN, CA .........................................................................................                           6,572               6,572
                                                                              SANTA BARBARA HARBOR, CA .......................................................................................               ........................           3,640    *




amozie on DSK123TN23PROD with REPORTS
                                                                              SANTA CRUZ HARBOR, CA .............................................................................................            ........................             540    *




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00033              Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                      34
                                                                                                         CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                                                                                           Committee
                                                                                                                                         Item                                                                Budget estimate            recommendation

                                                                              SCHEDULING RESERVOIR OPERATIONS, CA ...................................................................                        ........................           1,623    †
                                                                              SUCCESS LAKE, CA ........................................................................................................                     2,972               2,972
                                                                              SUISUN BAY CHANNEL, CA .............................................................................................           ........................           5,880    *
                                                                              TERMINUS DAM (LAKE KAWEAH), CA .............................................................................                                  5,750               5,750
                                                                              VENTURA HARBOR, CA ...................................................................................................         ........................           5,516    *
                                                                              YUBA RIVER, CA .............................................................................................................                     200              1,755    *
                                                                                                                                    COLORADO
                                                                              BEAR CREEK LAKE, CO ..................................................................................................                           662                662
                                                                              CHATFIELD LAKE, CO ......................................................................................................                     1,937               1,937
                                                                              CHERRY CREEK LAKE, CO ..............................................................................................                          1,487               1,487
                                                                              INSPECTION OF COMPLETED WORKS, CO .......................................................................                      ........................             314    †
                                                                              JOHN MARTIN RESERVOIR, CO .......................................................................................                             9,594               9,594
                                                                              SCHEDULING RESERVOIR OPERATIONS, CO ...................................................................                                       2,023               2,023
                                                                              TRINIDAD LAKE, CO ........................................................................................................     ........................             530    †
                                                                                                                                 CONNECTICUT
                                                                              BLACK ROCK LAKE, CT ...................................................................................................                          643                643
                                                                              COLEBROOK RIVER LAKE, CT .........................................................................................                               833                833
                                                                              HANCOCK BROOK LAKE, CT ............................................................................................                              558                558
                                                                              HOP BROOK LAKE, CT ....................................................................................................                       1,317               1,317
                                                                              INSPECTION OF COMPLETED WORKS, CT .......................................................................                      ........................             970    †
                                                                              MANSFIELD HOLLOW LAKE, CT .......................................................................................                                816                816
                                                                              NEW HAVEN HARBOR, CT ...............................................................................................           ........................             401    *
                                                                              NORTHFIELD BROOK LAKE, CT .......................................................................................                                585                585
                                                                              PROJECT CONDITION SURVEYS, CT ................................................................................                 ........................           1,100    *
                                                                              STAMFORD HURRICANE BARRIER, CT ............................................................................                                      597                597
                                                                              THOMASTON DAM, CT .....................................................................................................                       1,000               1,000
                                                                              WEST THOMPSON LAKE, CT ............................................................................................                              890                890
                                                                              WESTPORT HARBOR & SAUGATUCK RIVER, CT ..............................................................                           ........................           2,810
                                                                                                                                    DELAWARE
                                                                              INDIAN RIVER INLET AND BAY, DE .................................................................................               ........................              30    *
                                                                              INSPECTION OF COMPLETED WORKS, DE .......................................................................                      ........................               2    †
                                                                              INTRACOASTAL WATERWAY, DELAWARE RIVER TO CHESAPEAKE BAY, DE & MD ..........                                                    ........................          19,130    *
                                                                              INTRACOASTAL WATERWAY, REHOBOTH BAY DELAWARE BAY .......................................                                       ........................             150    *
                                                                              PROJECT CONDITION SURVEYS, DE ................................................................................                 ........................             225    *
                                                                              WILMINGTON HARBOR, DE ..............................................................................................           ........................           8,950    *
                                                                                                                          DISTRICT OF COLUMBIA
                                                                              INSPECTION OF COMPLETED WORKS, DC .......................................................................                      ........................              39    †
                                                                              POTOMAC AND ANACOSTIA RIVERS, DC (DRIFT REMOVAL) ...........................................                                   ........................           1,175    *
                                                                              PROJECT CONDITION SURVEYS, DC ................................................................................                 ........................              30    *
                                                                              WASHINGTON HARBOR, DC .............................................................................................            ........................              25    *
                                                                                                                                      FLORIDA
                                                                              CANAVERAL HARBOR, FL ................................................................................................          ........................           2,215    *
                                                                              CENTRAL AND SOUTHERN FLORIDA, FL ..........................................................................                                 22,243               23,854    *
                                                                              INSPECTION OF COMPLETED WORKS, FL ........................................................................                     ........................           1,003    †
                                                                              INTRACOASTAL WATERWAY, JACKSONVILLE TO MIAMI, FL .............................................                                                4,380               4,380
                                                                              JACKSONVILLE HARBOR, FL ............................................................................................           ........................           7,155    *
                                                                              JIM WOODRUFF LOCK AND DAM, LAKE SEMINOLE, FL, AL & GA ...................................                                                     8,501               8,501
                                                                              MANATEE HARBOR, FL ....................................................................................................        ........................             680    *
                                                                              MIAMI HARBOR, FL .........................................................................................................     ........................             180    *
                                                                              OKEECHOBEE WATERWAY, FL .........................................................................................                             1,365               3,710    *
                                                                              PALM BEACH HARBOR, FL ..............................................................................................           ........................           5,120    *
                                                                              PENSACOLA HARBOR, FL ................................................................................................          ........................              40    *
                                                                              PORT EVERGLADES HARBOR, FL ....................................................................................                ........................             180    *
                                                                              PROJECT CONDITION SURVEYS, FL .................................................................................                ........................           1,275    *
                                                                              REMOVAL OF AQUATIC GROWTH, FL ...............................................................................                  ........................           3,449    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, FL ....................................................................                       ........................             100    †




amozie on DSK123TN23PROD with REPORTS
                                                                              SOUTH FLORIDA ECOSYSTEM RESTORATION (EVERGLADES), FL ....................................                                                     8,950               8,950




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00034              Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                        35
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                                                                             Committee
                                                                                                                                          Item                                                                 Budget estimate            recommendation

                                                                              TAMPA HARBOR, FL ........................................................................................................        ........................          12,472    *
                                                                              WATER/ENVIRONMENTAL CERTIFICATION, FL ..................................................................                         ........................              80    *
                                                                                                                                      GEORGIA
                                                                              ALLATOONA LAKE, GA .....................................................................................................                        9,164               9,164
                                                                              APALACHICOLA, CHATTAHOOCHEE AND FLINT RIVERS, GA, AL & FL .............................                                                         1,459               1,459
                                                                              ATLANTIC INTRACOASTAL WATERWAY, GA ......................................................................                                       3,739               3,739
                                                                              BRUNSWICK HARBOR, GA ...............................................................................................             ........................           7,778    *
                                                                              BUFORD DAM AND LAKE SIDNEY LANIER, GA ................................................................                                        12,441               12,441
                                                                              CARTERS DAM AND LAKE, GA ........................................................................................                               8,504               8,504
                                                                              HARTWELL LAKE, GA & SC .............................................................................................                          13,090               13,090
                                                                              INSPECTION OF COMPLETED WORKS, GA .......................................................................                        ........................             196    †
                                                                              J STROM THURMOND LAKE, GA & SC ............................................................................                                   11,206               11,206
                                                                              PROJECT CONDITION SURVEYS, GA ................................................................................                   ........................              76    *
                                                                              RICHARD B RUSSELL DAM AND LAKE, GA & SC ...........................................................                                             9,541               9,541
                                                                              SAVANNAH HARBOR, GA .................................................................................................            ........................          33,053    *
                                                                              SAVANNAH RIVER BELOW AUGUSTA, GA ........................................................................                        ........................             148    *
                                                                              WEST POINT DAM AND LAKE, GA & AL ..........................................................................                                     8,354               8,354
                                                                                                                                       HAWAII
                                                                              BARBERS POINT DEEP DRAFT HARBOR, OAHU, HI ........................................................                                                 300                300
                                                                              INSPECTION OF COMPLETED WORKS, HI ........................................................................                       ........................             797    †
                                                                              PROJECT CONDITION SURVEYS, HI .................................................................................                  ........................             709    *
                                                                                                                                        IDAHO
                                                                              ALBENI FALLS DAM, ID ...................................................................................................                        1,245               1,245
                                                                              DWORSHAK DAM AND RESERVOIR, ID ............................................................................                                     3,063               3,063
                                                                              INSPECTION OF COMPLETED WORKS, ID ........................................................................                       ........................             466    †
                                                                              LUCKY PEAK LAKE, ID ....................................................................................................                        2,366               2,366
                                                                              SCHEDULING RESERVOIR OPERATIONS, ID ....................................................................                         ........................             750    †
                                                                                                                                       ILLINOIS
                                                                              CALUMET HARBOR AND RIVER, IL & IN .........................................................................                      ........................           5,009    *
                                                                              CARLYLE LAKE, IL ...........................................................................................................                  14,360               14,360
                                                                              CHICAGO HARBOR, IL .....................................................................................................         ........................          16,823    *
                                                                              CHICAGO RIVER, IL .........................................................................................................                        635                635
                                                                              FARM CREEK RESERVOIRS, IL ........................................................................................                                 541                541
                                                                              ILLINOIS WATERWAY (MVR PORTION), IL & IN ...............................................................                                      64,614               64,614
                                                                              ILLINOIS WATERWAY (MVS PORTION), IL & IN ...............................................................                                        2,183               2,183
                                                                              INSPECTION OF COMPLETED WORKS, IL ........................................................................                       ........................           2,787    †
                                                                              KASKASKIA RIVER NAVIGATION, IL ..................................................................................                               4,383               4,383
                                                                              LAKE MICHIGAN DIVERSION, IL ......................................................................................               ........................           1,190    *
                                                                              LAKE SHELBYVILLE, IL ....................................................................................................                     17,965               17,965
                                                                              MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS (MVR PORTION), IL                                                                    80,667               80,667    *
                                                                              MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS (MVS PORTION), IL                                                                    34,951               34,951
                                                                              PROJECT CONDITION SURVEYS, IL .................................................................................                  ........................             103    *
                                                                              REND LAKE, IL ................................................................................................................                12,797               12,797
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, IL .................................................                                   ........................             398    *
                                                                              WAUKEGAN HARBOR, IL ..................................................................................................           ........................              11    *
                                                                                                                                       INDIANA
                                                                              BROOKVILLE LAKE, IN .....................................................................................................                       3,157               3,157
                                                                              BURNS WATERWAY HARBOR, IN .....................................................................................                  ........................           1,561    *
                                                                              CAGLES MILL LAKE, IN ...................................................................................................                        1,335               1,335
                                                                              CECIL M HARDEN LAKE, IN ............................................................................................                            1,467               1,467
                                                                              INDIANA HARBOR, IN ......................................................................................................        ........................           8,196    *
                                                                              INSPECTION OF COMPLETED WORKS, IN ........................................................................                       ........................           1,264    †
                                                                              J EDWARD ROUSH LAKE, IN ...........................................................................................                             2,051               2,051
                                                                              MICHIGAN CITY HARBOR, IN ..........................................................................................              ........................              10    *
                                                                              MONROE LAKE, IN ..........................................................................................................                      1,479               1,479
                                                                              MISSISSINEWA LAKE, IN .................................................................................................                         1,915               1,915




amozie on DSK123TN23PROD with REPORTS
                                                                              PATOKA LAKE, IN ............................................................................................................                    1,446               1,446




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00035              Fmt 6604            Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                       36
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                            Committee
                                                                                                                                         Item                                                                 Budget estimate            recommendation

                                                                              PROJECT CONDITION SURVEYS, IN .................................................................................                 ........................             197    *
                                                                              SALAMONIE LAKE, IN ......................................................................................................                      3,282               3,282
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, IN ................................................                                   ........................              81    *
                                                                                                                                        IOWA
                                                                              CORALVILLE LAKE, IA .....................................................................................................                      6,170               6,170
                                                                              INSPECTION OF COMPLETED WORKS, IA ........................................................................                      ........................           1,202    †
                                                                              MISSOURI RIVER—SIOUX CITY TO THE MOUTH, IA, KS, MO & NE ...............................                                                      47,406               47,406
                                                                              PROJECT CONDITION SURVEYS .......................................................................................               ........................               2    *
                                                                              RATHBUN LAKE, IA .........................................................................................................                     3,254               3,254
                                                                              RED ROCK DAM AND LAKE RED ROCK, IA .....................................................................                                     27,728               27,728
                                                                              SAYLORVILLE LAKE, IA ....................................................................................................                    19,500               19,500
                                                                                                                                      KANSAS
                                                                              CLINTON LAKE, KS ..........................................................................................................                    2,763               2,763
                                                                              COUNCIL GROVE LAKE, KS .............................................................................................                           1,925               1,925
                                                                              EL DORADO LAKE, KS .....................................................................................................                          675                675
                                                                              ELK CITY LAKE, KS .........................................................................................................                    1,310               1,310
                                                                              FALL RIVER LAKE, KS .....................................................................................................                      4,214               4,214
                                                                              HILLSDALE LAKE, KS .......................................................................................................                     1,089               1,089
                                                                              INSPECTION OF COMPLETED WORKS, KS .......................................................................                       ........................           2,132    †
                                                                              JOHN REDMOND DAM AND RESERVOIR, KS ...................................................................                                         1,764               1,764
                                                                              KANOPOLIS LAKE, KS ......................................................................................................                      1,974               1,974
                                                                              MARION LAKE, KS ...........................................................................................................                    1,812               1,812
                                                                              MELVERN LAKE, KS ........................................................................................................                      2,667               2,667
                                                                              MILFORD LAKE, KS .........................................................................................................                     2,589               2,589
                                                                              PEARSON—SKUBITZ BIG HILL LAKE, KS ........................................................................                                     1,247               1,247
                                                                              PERRY LAKE, KS .............................................................................................................                   3,069               3,069
                                                                              POMONA LAKE, KS ..........................................................................................................                     2,951               2,951
                                                                              SCHEDULING RESERVOIR OPERATIONS, KS ....................................................................                        ........................             774    †
                                                                              TORONTO LAKE, KS .........................................................................................................                        694                694
                                                                              TUTTLE CREEK LAKE, KS ................................................................................................                       12,373               13,673
                                                                              WILSON LAKE, KS ...........................................................................................................                    1,902               1,902
                                                                                                                                    KENTUCKY
                                                                              BARKLEY DAM AND LAKE BARKLEY, KY & TN ...............................................................                                        19,522               19,522
                                                                              BARREN RIVER LAKE, KY ...............................................................................................                          3,228               3,228
                                                                              BIG SANDY HARBOR, KY ................................................................................................           ........................           1,977    *
                                                                              BUCKHORN LAKE, KY ......................................................................................................                       2,812               2,812
                                                                              CARR CREEK LAKE, KY ...................................................................................................                        2,220               2,220
                                                                              CAVE RUN LAKE, KY .......................................................................................................                      1,484               1,484
                                                                              DEWEY LAKE, KY ............................................................................................................                    2,096               2,096
                                                                              ELVIS STAHR (HICKMAN) HARBOR, KY ...........................................................................                    ........................             935    *
                                                                              FALLS OF THE OHIO NATIONAL WILDLIFE, KY & IN ........................................................                                               63                63
                                                                              FISHTRAP LAKE, KY ........................................................................................................                     2,515               2,515
                                                                              GRAYSON LAKE, KY ........................................................................................................                      1,867               1,867
                                                                              GREEN AND BARREN RIVERS, KY ..................................................................................                                 2,776               2,776
                                                                              GREEN RIVER LAKE, KY ..................................................................................................                        3,643               3,643
                                                                              INSPECTION OF COMPLETED WORKS, KY .......................................................................                       ........................           1,192    †
                                                                              LAUREL RIVER LAKE, KY ................................................................................................                         5,891               5,891
                                                                              MARTINS FORK LAKE, KY ................................................................................................                         1,443               1,443
                                                                              MIDDLESBORO CUMBERLAND RIVER BASIN, KY ............................................................                                               291                291
                                                                              NOLIN LAKE, KY ..............................................................................................................                  3,647               3,647
                                                                              OHIO RIVER LOCKS AND DAMS, KY, IL, IN & OH ...........................................................                                       55,307               55,307
                                                                              OHIO RIVER OPEN CHANNEL WORK, KY, IL, IN, OH, PA & WV ......................................                                                   7,563               7,563
                                                                              PAINTSVILLE LAKE, KY ....................................................................................................                      1,919               1,919
                                                                              PROJECT CONDITION SURVEYS .......................................................................................               ........................               5    *
                                                                              ROUGH RIVER LAKE, KY .................................................................................................                         4,541               4,541
                                                                              TAYLORSVILLE LAKE, KY .................................................................................................                        1,503               1,503
                                                                              WOLF CREEK DAM, LAKE CUMBERLAND, KY ..................................................................                                       17,476               17,476




amozie on DSK123TN23PROD with REPORTS
                                                                              YATESVILLE LAKE, KY .....................................................................................................                      2,503               2,503




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00036             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                      37
                                                                                                         CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                                                                                           Committee
                                                                                                                                         Item                                                                Budget estimate            recommendation

                                                                                                                                    LOUISIANA
                                                                              ATCHAFALAYA RIVER AND BAYOUS CHENE, BOEUF & BLACK, LA .................................                                        ........................          16,296    *
                                                                              BARATARIA BAY WATERWAY, LA .....................................................................................               ........................           6,200    *
                                                                              BAYOU BODCAU RESERVOIR, LA ....................................................................................                               1,494               1,494
                                                                              BAYOU LAFOURCHE AND LAFOURCHE JUMP WATERWAY, LA .........................................                                      ........................           6,185    *
                                                                              BAYOU PIERRE, LA .........................................................................................................                         33                33
                                                                              BAYOU SEGNETTE WATERWAY, LA ..................................................................................                 ........................              25    *
                                                                              BAYOU TECHE AND VERMILION RIVER, LA .....................................................................                      ........................          50,030    *
                                                                              BAYOU TECHE, LA ..........................................................................................................     ........................           1,150    *
                                                                              CADDO LAKE, LA .............................................................................................................                     186                186
                                                                              CALCASIEU RIVER AND PASS, LA ...................................................................................               ........................          20,500    *
                                                                              FRESHWATER BAYOU, LA ................................................................................................          ........................           3,634    *
                                                                              GULF INTRACOASTAL WATERWAY, LA .............................................................................                                70,715               70,715
                                                                              HOUMA NAVIGATION CANAL, LA .....................................................................................               ........................          12,593    *
                                                                              INSPECTION OF COMPLETED WORKS, LA .......................................................................                      ........................             978    †
                                                                              J BENNETT JOHNSTON WATERWAY, LA ...........................................................................                                 27,764               27,764
                                                                              LAKE PROVIDENCE HARBOR, LA .....................................................................................               ........................           1,332    *
                                                                              MADISON PARISH PORT, LA ............................................................................................           ........................             208    *
                                                                              MERMENTAU RIVER, LA ..................................................................................................         ........................          10,880    *
                                                                              MISSISSIPPI RIVER OUTLETS AT VENICE, LA ..................................................................                     ........................          19,755    *
                                                                              MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA ................................                                      ........................         126,000    *
                                                                              PROJECT CONDITION SURVEYS, LA ................................................................................                 ........................              51    *
                                                                              REMOVAL OF AQUATIC GROWTH, LA ..............................................................................                   ........................             200    *
                                                                              WALLACE LAKE, LA .........................................................................................................                       318                318
                                                                              WATERWAY FROM EMPIRE TO THE GULF, LA .................................................................                         ........................              10    *
                                                                              WATERWAY FROM INTRACOASTAL WATERWAY TO BAYOU DULAC, LA ...........................                                             ........................              15    *
                                                                                                                                       MAINE
                                                                              DISPOSAL AREA MONITORING, ME .................................................................................                 ........................           1,050    *
                                                                              GEORGE’S RIVER, ME .....................................................................................................       ........................              75    *
                                                                              INSPECTION OF COMPLETED WORKS, ME ......................................................................                       ........................             121    †
                                                                              JOSIAS RIVER, ME ..........................................................................................................    ........................             150    †
                                                                              PROJECT CONDITION SURVEYS, ME ...............................................................................                  ........................           1,100    *
                                                                              SEARSPORT HARBOR, ME ...............................................................................................           ........................           5,850    *
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, ME ...............................................                                   ........................              22    *
                                                                              ISLE AU HAUT THOROUGHFARE, ME ...............................................................................                  ........................             100
                                                                              WELLS HARBOR, ME .......................................................................................................       ........................           4,296    *
                                                                                                                                    MARYLAND
                                                                              BALTIMORE HARBOR AND CHANNELS (50 FOOT), MD ...................................................                                ........................          20,385    *
                                                                              BALTIMORE HARBOR, MD (DRIFT REMOVAL) .................................................................                         ........................             720    *
                                                                              CUMBERLAND, MD AND RIDGELEY, WV .........................................................................                                        219                219
                                                                              INSPECTION OF COMPLETED WORKS, MD ......................................................................                       ........................              89    †
                                                                              JENNINGS RANDOLPH LAKE, MD & WV ..........................................................................                                    2,488               2,488
                                                                              OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD .......................................                                     ........................             510    *
                                                                              POCOMOKE RIVER, MD ...................................................................................................         ........................               8
                                                                              PROJECT CONDITION SURVEYS, MD ...............................................................................                  ........................             600    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, MD ...................................................................                        ........................             123    †
                                                                              WICOMICO RIVER, MD ....................................................................................................        ........................           4,300    *
                                                                                                                               MASSACHUSETTS
                                                                              BARRE FALLS DAM, MA ..................................................................................................                           823                823
                                                                              BIRCH HILL DAM, MA .....................................................................................................                      1,054               1,054
                                                                              BUFFUMVILLE LAKE, MA .................................................................................................                           722                722
                                                                              CAPE COD CANAL, MA ....................................................................................................                       1,793              24,216    *
                                                                              CHARLES RIVER NATURAL VALLEY STORAGE AREA, MA ................................................                                                   401                401
                                                                              CONANT BROOK LAKE, MA .............................................................................................                              371                371
                                                                              EAST BRIMFIELD LAKE, MA ............................................................................................                             758                758
                                                                              GREEN HARBOR, MA ......................................................................................................        ........................           2,749    *
                                                                              HODGES VILLAGE DAM, MA ............................................................................................                              793                793




amozie on DSK123TN23PROD with REPORTS
                                                                              INSPECTION OF COMPLETED WORKS, MA ......................................................................                       ........................             450    †




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00037              Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                            38
                                                                                                           CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                            [In thousands of dollars]

                                                                                                                                                                                                                                                   Committee
                                                                                                                                            Item                                                                     Budget estimate            recommendation

                                                                              KNIGHTVILLE DAM, MA ...................................................................................................                                  887                887
                                                                              LITTLEVILLE LAKE, MA ....................................................................................................                                821                821
                                                                              NEW BEDFORD FAIRHAVEN AND ACUSHNET HURRICANE BARRIER, MA ........................                                                                        537                537
                                                                              PROJECT CONDITION SURVEYS, MA ...............................................................................                          ........................           1,490    *
                                                                                   MERRIMACK SPUR JETTY, MA ...............................................................................                          ........................           (240)
                                                                              PLYMOUTH HARBOR, MA ................................................................................................                   ........................               6    *
                                                                              TULLY LAKE, MA .............................................................................................................                             984                984
                                                                              WEST HILL DAM, MA .......................................................................................................                                934                934
                                                                              WESTVILLE LAKE, MA ......................................................................................................                                752                752
                                                                                                                                        MICHIGAN
                                                                              ALPENA HARBOR, MI ......................................................................................................               ........................               5    *
                                                                              CHANNELS IN LAKE ST CLAIR, MI ..................................................................................                       ........................             243    *
                                                                              CHEBOYGAN HARBOR, MI ...............................................................................................                   ........................               6    *
                                                                              CHARLEVOIX HARBOR, MI ..............................................................................................                   ........................             570    *
                                                                              DETROIT HARBOR, MI .....................................................................................................               ........................           7,645    *
                                                                              GRAND HAVEN HARBOR AND GRAND RIVER, MI ............................................................                                    ........................           3,934    *
                                                                              HARBOR BEACH HARBOR, MI .........................................................................................                      ........................           1,320    *
                                                                              HOLLAND HARBOR, MI ....................................................................................................                ........................             516    *
                                                                              INSPECTION OF COMPLETED WORKS, MI .......................................................................                              ........................             329    †
                                                                              INLAND ROUTE, MI .........................................................................................................             ........................              52    *
                                                                              KAWKAWLIN DREDGING, MI ............................................................................................                                      570                570
                                                                              KEWEENAW WATERWAY, MI ............................................................................................                                         10             1,279    *
                                                                              LUDINGTON HARBOR, MI ................................................................................................                  ........................           1,007    *
                                                                              MANISTEE HARBOR, MI ..................................................................................................                 ........................           4,111    *
                                                                              MANISTIQUE HARBOR, MI ...............................................................................................                  ........................           1,332    *
                                                                              MARQUETTE HARBOR, MI ...............................................................................................                   ........................               5    *
                                                                              MENOMINEE HARBOR, MI AND WI ..................................................................................                         ........................               5    *
                                                                              MONROE HARBOR, MI ....................................................................................................                 ........................           1,137    *
                                                                              MUSKEGON HARBOR, MI ................................................................................................                   ........................           1,711    *
                                                                              ONTONAGON HARBOR, MI ...............................................................................................                   ........................           1,136    *
                                                                              PRESQUE ISLE HARBOR, MI ...........................................................................................                    ........................           1,505    *
                                                                              PROJECT CONDITION SURVEYS, MI ................................................................................                         ........................             828    *
                                                                              ROUGE RIVER, MI ...........................................................................................................            ........................           1,133    *
                                                                              SAGINAW RIVER, MI ........................................................................................................             ........................           3,844    *
                                                                              SEBEWAING RIVER, MI ...................................................................................................                                  214                214
                                                                              SOUTH BEACH, MI ..........................................................................................................             ........................           1,000
                                                                              SOUTH HAVEN HARBOR, MI ............................................................................................                    ........................             500    *
                                                                              ST CLAIR RIVER, MI .......................................................................................................             ........................           1,653    *
                                                                              ST JOSEPH HARBOR, MI .................................................................................................                 ........................           1,068    *
                                                                              ST MARYS RIVER, MI ......................................................................................................                             2,702              58,361    *
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, MI ................................................                                          ........................           2,217    *
                                                                              WHITE LAKE HARBOR, MI ...............................................................................................                  ........................             500    *
                                                                                                                                       MINNESOTA
                                                                              BIGSTONE LAKE—WHETSTONE RIVER, MN & SD ..........................................................                                                        318                318
                                                                              DULUTH—SUPERIOR HARBOR, MN & WI .......................................................................                                                  400              6,847    *
                                                                              GRAND MARAIS HARBOR, MN ........................................................................................                       ........................              25    *
                                                                              INSPECTION OF COMPLETED WORKS, MN ......................................................................                               ........................             565    †
                                                                              LAC QUI PARLE LAKES, MINNESOTA RIVER, MN ............................................................                                                 1,150               1,150
                                                                              MINNESOTA RIVER, MN ..................................................................................................                 ........................             265    *
                                                                              MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS (MVP PORTION),
                                                                                 MN ..............................................................................................................................              104,193               104,193    *
                                                                              ORWELL LAKE, MN ..........................................................................................................                               565                565
                                                                              PROJECT CONDITION SURVEYS, MN ...............................................................................                          ........................             104    *
                                                                              RED LAKE RESERVOIR, MN ............................................................................................                                      206                206
                                                                              RESERVOIRS AT HEADWATERS OF MISSISSIPPI RIVER, MN ...........................................                                                         6,576               6,576
                                                                              ST PAUL SMALL BOAT HARBOR, MN ..............................................................................                           ........................             500
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, MN ...............................................                                           ........................             428    *




amozie on DSK123TN23PROD with REPORTS
                                                                              TWO HARBORS, MN ........................................................................................................               ........................              31    *




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272              PO 00000               Frm 00038               Fmt 6604             Sfmt 6602              U:\SR036.XXX                 SR036
                                                                                                                                                                              39
                                                                                                            CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                             [In thousands of dollars]

                                                                                                                                                                                                                                                     Committee
                                                                                                                                             Item                                                                      Budget estimate            recommendation

                                                                                                                                       MISSISSIPPI
                                                                              EAST FORK, TOMBIGBEE RIVER, MS ..............................................................................                                              290                290
                                                                              GULFPORT HARBOR, MS .................................................................................................                    ........................           9,536    *
                                                                              INSPECTION OF COMPLETED WORKS, MS ......................................................................                                 ........................             103    †
                                                                              MOUTH OF YAZOO RIVER, MS ........................................................................................                        ........................              32    *
                                                                              OKATIBBEE LAKE, MS .....................................................................................................                                2,152               2,152
                                                                              PASCAGOULA HARBOR, MS ............................................................................................                       ........................           6,287    *
                                                                              PEARL RIVER, MS & LA ..................................................................................................                                    140                140
                                                                              PROJECT CONDITION SURVEYS, MS ...............................................................................                            ........................             155    *
                                                                              ROSEDALE HARBOR, MS .................................................................................................                    ........................           1,687    *
                                                                              WATER/ENVIRONMENTAL CERTIFICATION, MS ................................................................                                   ........................              40    *
                                                                              YAZOO RIVER, MS ..........................................................................................................               ........................              32    *
                                                                                                                                         MISSOURI
                                                                              CARUTHERSVILLE HARBOR, MO .....................................................................................                          ........................             791    *
                                                                              CLARENCE CANNON DAM AND MARK TWAIN LAKE, MO .................................................                                                         11,301               11,301
                                                                              CLEARWATER LAKE, MO .................................................................................................                                   4,639               4,639
                                                                              HARRY S TRUMAN DAM AND RESERVOIR, MO ...............................................................                                                  14,482               14,482
                                                                              INSPECTION OF COMPLETED WORKS, MO ......................................................................                                 ........................           1,563    †
                                                                              LITTLE BLUE RIVER LAKES, MO ......................................................................................                                      1,345               1,345
                                                                              LONG BRANCH LAKE, MO ...............................................................................................                                       948                948
                                                                              MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI RIVERS (REG WORKS), MO &
                                                                                 IL ................................................................................................................................                35,279               35,279
                                                                              NEW MADRID COUNTY HARBOR, MO ..............................................................................                              ........................             520    *
                                                                              NEW MADRID HARBOR, MO (MILE 889) .........................................................................                               ........................              92    *
                                                                              POMME DE TERRE LAKE, MO .........................................................................................                                       4,704               4,704
                                                                              PROJECT CONDITION SURVEYS, MO ...............................................................................                            ........................               5    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, MO ...................................................................                                  ........................             174
                                                                              SMITHVILLE LAKE, MO ....................................................................................................                                2,033               2,033
                                                                              SOUTHEAST MISSOURI PORT, MISSISSIPPI RIVER, MO ..................................................                                        ........................             234    *
                                                                              STOCKTON LAKE, MO ......................................................................................................                                5,817               5,817
                                                                              TABLE ROCK LAKE, MO & AR .........................................................................................                                      9,693               9,693
                                                                                                                                         MONTANA
                                                                              FT PECK DAM AND LAKE, MT .........................................................................................                                      6,017               6,017
                                                                              INSPECTION OF COMPLETED WORKS, MT .......................................................................                                ........................             191    †
                                                                              LIBBY DAM, MT ..............................................................................................................                            1,744               1,744
                                                                              SCHEDULING RESERVOIR OPERATIONS, MT ...................................................................                                  ........................             130    †
                                                                                                                                        NEBRASKA
                                                                              GAVINS POINT DAM, LEWIS AND CLARK LAKE, NE & SD ...............................................                                                       10,093               10,093
                                                                              HARLAN COUNTY LAKE, NE ............................................................................................                                     9,151               9,151
                                                                              INSPECTION OF COMPLETED WORKS, NE .......................................................................                                ........................             785    †
                                                                              MISSOURI RIVER—KENSLERS BEND, NE TO SIOUX CITY, IA ........................................                                                                117                117
                                                                              PAPILLION CREEK, NE ....................................................................................................                                1,196               1,196
                                                                              SALT CREEKS AND TRIBUTARIES, NE .............................................................................                                           1,337               1,337
                                                                                                                                          NEVADA
                                                                              INSPECTION OF COMPLETED WORKS, NV .......................................................................                                ........................              50    †
                                                                              MARTIS CREEK LAKE, NV & CA ......................................................................................                                       1,435               1,435
                                                                              PINE AND MATHEWS CANYONS LAKES, NV ....................................................................                                                    591                591
                                                                                                                                   NEW HAMPSHIRE
                                                                              BLACKWATER DAM, NH ...................................................................................................                                     865                865
                                                                              EDWARD MACDOWELL LAKE, NH ....................................................................................                                             826                826
                                                                              FRANKLIN FALLS DAM, NH ..............................................................................................                                      890                890
                                                                              HOPKINTON—EVERETT LAKES, NH .................................................................................                                           1,933               1,933
                                                                              INSPECTION OF COMPLETED, NH ...................................................................................                          ........................             111    †
                                                                              OTTER BROOK LAKE, NH ................................................................................................                                   1,204               1,204
                                                                              PROJECT CONDITION SURVEYS, NH ................................................................................                           ........................             350    *




amozie on DSK123TN23PROD with REPORTS
                                                                              SURRY MOUNTAIN LAKE, NH ..........................................................................................                                      1,253               1,253




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272               PO 00000               Frm 00039               Fmt 6604             Sfmt 6602              U:\SR036.XXX                  SR036
                                                                                                                                                                       40
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                            Committee
                                                                                                                                         Item                                                                 Budget estimate            recommendation

                                                                                                                                   NEW JERSEY
                                                                              BARNEGAT INLET, NJ ......................................................................................................       ........................             760    *
                                                                              COLD SPRING INLET, NJ .................................................................................................         ........................             300    *
                                                                              DELAWARE RIVER AT CAMDEN, NJ .................................................................................                  ........................              15    *
                                                                              DELAWARE RIVER, PHILADELPHIA TO THE SEA, NJ, PA & DE ........................................                                   ........................          41,823    *
                                                                              INSPECTION OF COMPLETED WORKS, NJ ........................................................................                      ........................             382    †
                                                                              MANASQUAN RIVER, NJ ..................................................................................................          ........................             375    *
                                                                              MAURICE RIVER, NJ ........................................................................................................      ........................           4,010    *
                                                                              NEW JERSEY INTRACOASTAL WATERWAY, NJ .................................................................                          ........................             985    *
                                                                              NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, NJ .................................................                                 ........................          24,825    *
                                                                              PASSAIC RIVER FLOOD WARNING SYSTEMS, NJ .............................................................                                             600                600
                                                                              PROJECT CONDITION SURVEYS, NJ .................................................................................                 ........................           2,175    *
                                                                              SALEM RIVER, NJ ............................................................................................................    ........................             100    *
                                                                              SHARK RIVER, NJ ............................................................................................................    ........................           1,150    *
                                                                                                                                   NEW MEXICO
                                                                              ABIQUIU DAM, NM ..........................................................................................................                     6,378               6,378
                                                                              COCHITI LAKE, NM ..........................................................................................................                    2,962               2,962
                                                                              CONCHAS LAKE, NM .......................................................................................................                       3,808               3,808
                                                                              GALISTEO DAM, NM ........................................................................................................                         685                685
                                                                              INSPECTION OF COMPLETED WORKS, NM ......................................................................                        ........................             526    †
                                                                              JEMEZ CANYON DAM, NM ...............................................................................................                           1,102               1,102
                                                                              MIDDLE RIO GRANDE ENDANGERED SPECIES COLLABORATIVE PROGRAM, NM ............                                                                    1,994               1,994
                                                                              SANTA ROSA DAM AND LAKE, NM ..................................................................................                                 1,502               1,502
                                                                              SCHEDULING RESERVOIR OPERATIONS, NM ...................................................................                         ........................             270    †
                                                                              TWO RIVERS DAM, NM ...................................................................................................                            937                937
                                                                              UPPER RIO GRANDE WATER OPERATIONS MODEL STUDY, NM ......................................                                                       1,006               1,006
                                                                                                                                    NEW YORK
                                                                              ALMOND LAKE, NY ..........................................................................................................                        716                716
                                                                              ARKPORT DAM, NY .........................................................................................................                         559                559
                                                                              BARCELONA HARBOR, NY ...............................................................................................            ........................           1,150
                                                                              BAY RIDGE AND RED HOOK CHANNELS, NY ..................................................................                          ........................             200    *
                                                                              BLACK ROCK CHANNEL AND TONAWANDA HARBOR, NY ................................................                                    ........................          10,600    *
                                                                              BRONX RIVER, NY ..........................................................................................................      ........................             250    *
                                                                              BUFFALO HARBOR, NY ....................................................................................................         ........................          20,908
                                                                              BUTTERMILK CHANNEL, NY ............................................................................................             ........................          19,525    *
                                                                              CATTARAUGUS BREAKWATER, NY ...................................................................................                  ........................           1,000
                                                                              DUNKIRK HARBOR, NY ....................................................................................................         ........................           5,930    *
                                                                              EAST RIVER, NY ..............................................................................................................   ........................               5    *
                                                                              EAST ROCKAWAY INLET, NY ...........................................................................................             ........................          11,500    *
                                                                              EAST SIDNEY LAKE, NY ..................................................................................................         ........................             712    *
                                                                              FIRE ISLAND INLET TO JONES INLET, NY .......................................................................                    ........................              25
                                                                              FLUSHING BAY AND CREEK, NY .....................................................................................                ........................          24,880    *
                                                                              GREAT KILLS HARBOR, NY .............................................................................................            ........................             100    *
                                                                              HUDSON RIVER, NY (MAINT) ..........................................................................................             ........................           4,810    *
                                                                              HUDSON RIVER, NY (O & C) ..........................................................................................             ........................           2,350    *
                                                                              JONES INLET, NY ............................................................................................................    ........................          19,025    *
                                                                              LITTLE SODUS BAY HARBOR, NY ....................................................................................                ........................           7,900    *
                                                                              INSPECTION OF COMPLETED WORKS, NY .......................................................................                       ........................           1,464    †
                                                                              MOUNT MORRIS DAM, NY ...............................................................................................                           5,799               5,799
                                                                              NEW YORK AND NEW JERSEY CHANNELS, NY & NJ .......................................................                               ........................               5    *
                                                                              NEW YORK AND NEW JERSEY HARBOR, NY & NJ ..........................................................                              ........................          87,980    *
                                                                              NEW YORK HARBOR, NY .................................................................................................           ........................           7,885    *
                                                                              NEW YORK HARBOR, NY & NJ (DRIFT REMOVAL) ..........................................................                             ........................          12,591    *
                                                                              NEW YORK HARBOR, NY (PREVENTION OF OBSTRUCTIVE DEPOSITS) ...........................                                            ........................           2,059    *
                                                                              OSWEGO HARBOR, NY ....................................................................................................          ........................           5,606    *
                                                                              PROJECT CONDITION SURVEYS, NY ................................................................................                  ........................           2,468    *
                                                                              ROCHESTER HARBOR, NY ...............................................................................................            ........................           5,010    *
                                                                              ROUNDOUT HARBOR, NY ................................................................................................            ........................             200    *




amozie on DSK123TN23PROD with REPORTS
                                                                              SOUTHERN NEW YORK FLOOD CONTROL PROJECTS, NY ................................................                                                     980                980




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00040             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                       41
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                            Committee
                                                                                                                                         Item                                                                 Budget estimate            recommendation

                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, NY ...............................................                                    ........................             597    *
                                                                              WEST ARROWHEAD BREAKWATER, NY ............................................................................                      ........................             300
                                                                              WHITNEY POINT LAKE, NY ..............................................................................................                             832                832
                                                                                                                               NORTH CAROLINA
                                                                              ATLANTIC INTRACOASTAL WATERWAY, NC ......................................................................                                      5,950               5,950
                                                                              B EVERETT JORDAN DAM AND LAKE, NC .......................................................................                                      2,077               2,077
                                                                              CAPE FEAR RIVER ABOVE WILMINGTON, NC ..................................................................                                           151                480    *
                                                                              FALLS LAKE, NC ..............................................................................................................                  3,189               3,189
                                                                              INSPECTION OF COMPLETED WORKS, NC .......................................................................                       ........................             209    †
                                                                              MANTEO (SHALLOWBAG) BAY, NC ..................................................................................                  ........................           3,296    *
                                                                              MOREHEAD CITY HARBOR, NC .......................................................................................                ........................           8,340    *
                                                                              NEW RIVER INLET, NC ....................................................................................................        ........................             390    *
                                                                              PROJECT CONDITION SURVEYS, NC ................................................................................                  ........................             700    *
                                                                              ROLLINSON CHANNEL, NC ..............................................................................................            ........................           1,700    *
                                                                              SILVER LAKE HARBOR, NC .............................................................................................            ........................           1,120    *
                                                                              W KERR SCOTT DAM AND RESERVOIR, NC ....................................................................                                        4,025               4,025
                                                                              WILMINGTON HARBOR, NC .............................................................................................             ........................          25,260    *
                                                                                                                                 NORTH DAKOTA
                                                                              BOWMAN HALEY, ND ......................................................................................................                           351                351
                                                                              GARRISON DAM, LAKE SAKAKAWEA, ND .........................................................................                                   18,609               18,609
                                                                              HOMME LAKE, ND ...........................................................................................................                        409                409
                                                                              INSPECTION OF COMPLETED WORKS, ND .......................................................................                       ........................             311    †
                                                                              LAKE ASHTABULA AND BALDHILL DAM, ND ....................................................................                                       1,689               1,689
                                                                              PIPESTEM LAKE, ND .......................................................................................................                         615                615
                                                                              SCHEDULING RESERVOIR OPERATIONS, ND ...................................................................                         ........................             128    †
                                                                              SOURIS RIVER, ND .........................................................................................................                        381                381
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, ND ...............................................                                    ........................             125    *
                                                                                                                                        OHIO
                                                                              ALUM CREEK LAKE, OH ..................................................................................................                         5,454               5,454
                                                                              ASHTABULA HARBOR, OH ...............................................................................................            ........................             457    *
                                                                              BERLIN LAKE, OH ...........................................................................................................                    3,554               3,554
                                                                              CAESAR CREEK LAKE, OH ..............................................................................................                           2,928               2,928
                                                                              CLARENCE J BROWN DAM, OH .......................................................................................                               1,958               1,958
                                                                              CLEVELAND HARBOR, OH ...............................................................................................            ........................          10,020    *
                                                                              CONNEAUT HARBOR, OH ................................................................................................            ........................           2,764    *
                                                                              DEER CREEK LAKE, OH ..................................................................................................                         2,057               2,057
                                                                              DELAWARE LAKE, OH ......................................................................................................                       4,364               4,364
                                                                              DILLON LAKE, OH ............................................................................................................                   3,335               3,335
                                                                              FAIRPORT HARBOR, OH ..................................................................................................          ........................           3,880    *
                                                                              HURON HARBOR, OH ......................................................................................................         ........................               8    *
                                                                              INSPECTION OF COMPLETED WORKS, OH .......................................................................                       ........................             984    †
                                                                              LORAIN HARBOR, OH ......................................................................................................        ........................           2,317    *
                                                                              MASSILLON LOCAL PROTECTION PROJECT, OH ..............................................................                                             235                235
                                                                              MICHAEL J KIRWAN DAM AND RESERVOIR, OH ..............................................................                                          1,805               1,805
                                                                              MOSQUITO CREEK LAKE, OH ..........................................................................................                             4,610               4,610
                                                                              MUSKINGUM RIVER LAKES, OH ......................................................................................                             24,813               24,813
                                                                              NORTH BRANCH KOKOSING RIVER LAKE, OH .................................................................                                            558                558
                                                                              OHIO–MISSISSIPPI FLOOD CONTROL, OH .......................................................................                                     1,490               1,490
                                                                              PAINT CREEK LAKE, OH ..................................................................................................                        2,578               2,578
                                                                              PROJECT CONDITION SURVEYS, OH ................................................................................                  ........................             340    *
                                                                              ROSEVILLE LOCAL PROTECTION PROJECT, OH ...............................................................                                              56                56
                                                                              SANDUSKY HARBOR, OH .................................................................................................           ........................           1,163    *
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, OH ...............................................                                    ........................             230    *
                                                                              TOLEDO HARBOR, OH .....................................................................................................         ........................           6,929    *
                                                                              TOM JENKINS DAM, OH ...................................................................................................                           984                984
                                                                              VERMILION HARBOR, OH ................................................................................................           ........................           5,700    *
                                                                              WEST FORK OF MILL CREEK LAKE, OH ..........................................................................                                    4,875               4,875




amozie on DSK123TN23PROD with REPORTS
                                                                              WILLIAM H HARSHA LAKE, OH ........................................................................................                             2,221               2,221




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00041             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                       42
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                            Committee
                                                                                                                                         Item                                                                 Budget estimate            recommendation

                                                                                                                                    OKLAHOMA
                                                                              ARCADIA LAKE, OK .........................................................................................................                        525                525
                                                                              BIRCH LAKE, OK .............................................................................................................                      847                847
                                                                              BROKEN BOW LAKE, OK .................................................................................................                          3,267               3,267
                                                                              CANTON LAKE, OK ..........................................................................................................                     2,207               2,207
                                                                              COPAN LAKE, OK ............................................................................................................                    1,885               1,885
                                                                              EUFAULA LAKE, OK .........................................................................................................                   16,618               16,618
                                                                              FORT GIBSON LAKE, OK ..................................................................................................                        5,195               5,195
                                                                              FORT SUPPLY LAKE, OK ..................................................................................................                        1,163               1,163
                                                                              GREAT SALT PLAINS LAKE, OK .......................................................................................                                454                454
                                                                              HEYBURN LAKE, OK ........................................................................................................                         817                817
                                                                              HUGO LAKE, OK ..............................................................................................................                   1,896               1,896
                                                                              HULAH LAKE, OK .............................................................................................................                   1,908               1,908
                                                                              INSPECTION OF COMPLETED WORKS, OK .......................................................................                       ........................             310    †
                                                                              KAW LAKE, OK ................................................................................................................                  2,833               2,833
                                                                              KEYSTONE LAKE, OK .......................................................................................................                      4,874               4,874
                                                                              MCCLELLAN–KERR ARKANSAS RIVER NAVIGATION SYSTEM, OK ....................................                                                     37,629               37,629
                                                                              OOLOGAH LAKE, OK ........................................................................................................                      5,221               5,221
                                                                              OPTIMA LAKE, OK ...........................................................................................................                       198                198
                                                                              PENSACOLA RESERVOIR, LAKE OF THE CHEROKEES, OK ...............................................                                                    163                163
                                                                              PINE CREEK LAKE, OK ....................................................................................................                       1,745               1,745
                                                                              SARDIS LAKE, OK ............................................................................................................                   1,556               1,556
                                                                              SCHEDULING RESERVOIR OPERATIONS, OK ...................................................................                         ........................           1,750    †
                                                                              SKIATOOK LAKE, OK ........................................................................................................                     5,130               5,130
                                                                              TENKILLER FERRY LAKE, OK ...........................................................................................                         11,990               11,990
                                                                              WAURIKA LAKE, OK .........................................................................................................                     2,796               2,796
                                                                              WISTER LAKE, OK ...........................................................................................................                       988                988
                                                                                                                                      OREGON
                                                                              APPLEGATE LAKE, OR .....................................................................................................                       1,674               1,674
                                                                              BLUE RIVER LAKE, OR ....................................................................................................                       1,385               1,385
                                                                              BONNEVILLE LOCK AND DAM, OR & WA ........................................................................                                      1,937               8,994    *
                                                                              CHETCO RIVER, OR ........................................................................................................       ........................             954    *
                                                                              COLES RIVER HATCHERY, APPLEGATE & LOST CREEK, OR ...........................................                                    ........................           1,819
                                                                              COLUMBIA RIVER AT THE MOUTH, OR & WA .................................................................                          ........................          41,061    *
                                                                              COOS BAY, OR ................................................................................................................   ........................           7,951    *
                                                                              COOS BAY (MAJOR MAINTENANCE), OR .........................................................................                      ........................          32,720
                                                                              COQUILLE RIVER, OR ......................................................................................................       ........................             619    *
                                                                              COTTAGE GROVE LAKE, OR ............................................................................................                            2,415               2,415
                                                                              COUGAR LAKE, OR ..........................................................................................................                     2,756               2,756
                                                                              DEPOE BAY, OR ..............................................................................................................    ........................              71    *
                                                                              DETROIT LAKE, OR ..........................................................................................................                    1,720               1,720
                                                                              DORENA LAKE, OR ..........................................................................................................                     3,326               3,326
                                                                              ELK CREEK LAKE, OR .....................................................................................................                          248                248
                                                                              FALL CREEK LAKE, OR ....................................................................................................                       2,423               2,423
                                                                              FERN RIDGE LAKE, OR ...................................................................................................                        2,939               2,939
                                                                              GREEN PETER—FOSTER LAKES, OR ..............................................................................                                    2,898               2,898
                                                                              HILLS CREEK LAKE, OR ..................................................................................................                        1,598               1,598
                                                                              INSPECTION OF COMPLETED WORKS, OR .......................................................................                       ........................             425    †
                                                                              JOHN DAY LOCK AND DAM, OR & WA ............................................................................                                    6,300               6,300
                                                                              LOOKOUT POINT LAKE, OR ..............................................................................................                          3,167               3,167
                                                                              LOST CREEK LAKE, OR ...................................................................................................                        4,810               4,810
                                                                              MCNARY LOCK AND DAM, OR & WA ..............................................................................                                  14,983               14,983
                                                                              NEHALEM BAY, OR .........................................................................................................       ........................              15    *
                                                                              PORT ORFORD, OR .........................................................................................................       ........................             459    *
                                                                              PROJECT CONDITION SURVEYS, OR ................................................................................                  ........................             477    *
                                                                              ROGUE RIVER AT GOLD BEACH, OR ...............................................................................                   ........................           2,781    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, OR ...................................................................                         ........................             104    †
                                                                              SIUSLAW RIVER, OR .......................................................................................................       ........................           1,049    *
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, OR ...............................................                                    ........................          10,350    *




amozie on DSK123TN23PROD with REPORTS
                                                                              TILLAMOOK BAY & BAR, OR ...........................................................................................             ........................             172    *




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00042             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                      43
                                                                                                         CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                                                                                           Committee
                                                                                                                                         Item                                                                Budget estimate            recommendation

                                                                              UMPQUA RIVER, OR ........................................................................................................      ........................           1,183    *
                                                                              WILLAMETTE RIVER AT WILLAMETTE FALLS, OR .............................................................                                             80                80
                                                                              WILLAMETTE RIVER BANK PROTECTION, OR ..................................................................                                          160                160
                                                                              WILLOW CREEK LAKE, OR ...............................................................................................                         1,189               1,189
                                                                              YAQUINA BAY AND HARBOR, OR ....................................................................................                ........................           4,572    *
                                                                                                                                 PENNSYLVANIA
                                                                              ALLEGHENY RIVER, PA ...................................................................................................                       9,064               9,064
                                                                              ALVIN R BUSH DAM, PA .................................................................................................                           782                782
                                                                              AYLESWORTH CREEK LAKE, PA ......................................................................................                                 312                312
                                                                              BELTZVILLE LAKE, PA .....................................................................................................                     1,886               1,886
                                                                              BLUE MARSH LAKE, PA ..................................................................................................                        4,734               4,734
                                                                              CONEMAUGH RIVER LAKE, PA ........................................................................................                             1,677               1,677
                                                                              COWANESQUE LAKE, PA .................................................................................................                         2,244               2,244
                                                                              CROOKED CREEK LAKE, PA ............................................................................................                           2,348               2,348
                                                                              CURWENSVILLE LAKE, PA ...............................................................................................                         1,260               1,260
                                                                              DELAWARE RIVER, PHILADELPHIA, PA TO TRENTON, NJ ................................................                               ........................          13,710    *
                                                                              EAST BRANCH CLARION RIVER LAKE, PA .......................................................................                                    2,013               2,013
                                                                              ERIE HARBOR, PA ...........................................................................................................    ........................             263    *
                                                                              FOSTER JOSEPH SAYERS DAM, PA .................................................................................                                1,837               1,837
                                                                              FRANCIS E WALTER DAM, PA .........................................................................................                            1,225               1,225
                                                                              GENERAL EDGAR JADWIN DAM AND RESERVOIR, PA .....................................................                                                 459                459
                                                                              INSPECTION OF COMPLETED WORKS, PA .......................................................................                      ........................             601    †
                                                                              JOHNSTOWN, PA ..............................................................................................................                  3,288               3,288
                                                                              KINZUA DAM AND ALLEGHENY RESERVOIR, PA .............................................................                                          2,362               2,362
                                                                              LOYALHANNA LAKE, PA ...................................................................................................                       5,308               5,308
                                                                              MAHONING CREEK LAKE, PA ..........................................................................................                            2,409               2,409
                                                                              MONONGAHELA RIVER, PA ..............................................................................................                        18,807               18,807
                                                                              OHIO RIVER LOCKS AND DAMS, PA, OH & WV ..............................................................                                       76,654               76,654
                                                                              OHIO RIVER OPEN CHANNEL WORK, PA, OH & WV ........................................................                                               851                851
                                                                              PROJECT CONDITION SURVEYS, PA ................................................................................                 ........................             177    *
                                                                              PROMPTON LAKE, PA ......................................................................................................                      1,049               1,049
                                                                              PUNXSUTAWNEY, PA .......................................................................................................                         100                100
                                                                              RAYSTOWN LAKE, PA ......................................................................................................                      4,828               4,828
                                                                              SCHEDULING RESERVOIR OPERATIONS, PA ....................................................................                       ........................              82    †
                                                                              SCHUYLKILL RIVER, PA ...................................................................................................       ........................             100    *
                                                                              SHENANGO RIVER LAKE, PA ...........................................................................................                           3,675               3,675    ...
                                                                              STILLWATER LAKE, PA ....................................................................................................                         481                481
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, PA ................................................                                  ........................              91    *
                                                                              TIOGA—HAMMOND LAKES, PA .......................................................................................                               3,000               3,000
                                                                              TIONESTA LAKE, PA ........................................................................................................                    3,934               3,934
                                                                              UNION CITY LAKE, PA .....................................................................................................                        626                626
                                                                              WOODCOCK CREEK LAKE, PA .........................................................................................                             1,381               1,381
                                                                              YORK INDIAN ROCK DAM, PA .........................................................................................                               989                989
                                                                              YOUGHIOGHENY RIVER LAKE, PA & MD .........................................................................                                    4,345               4,345
                                                                                                                                  PUERTO RICO
                                                                              INSPECTION OF COMPLETED WORKS, PR .......................................................................                      ........................             150    †
                                                                              PROJECT CONDITION SURVEYS, PR ................................................................................                 ........................             100    *
                                                                              SAN JUAN HARBOR, PR ..................................................................................................         ........................           3,940    *
                                                                                                                                 RHODE ISLAND
                                                                              BLOCK ISLAND HARBOR OF REFUGE, RI ........................................................................                     ........................             350    *
                                                                              FOX POINT BARRIER, NARRANGANSETT BAY, RI ............................................................                                            704                929
                                                                              GREAT SALT POND, BLOCK ISLAND, RI ..........................................................................                   ........................             350    *
                                                                              INSPECTION OF COMPLETED WORKS, RI ........................................................................                     ........................              49    †
                                                                              PROJECT CONDITION SURVEYS, RI .................................................................................                ........................             500    *
                                                                              PROVIDENCE RIVER AND HARBOR, RI ...........................................................................                    ........................          38,600    *
                                                                              WOONSOCKET LOCAL PROTECTION PROJECT, RI ............................................................                                             543                668
                                                                                                                               SOUTH CAROLINA




amozie on DSK123TN23PROD with REPORTS
                                                                              ATLANTIC INTRACOASTAL WATERWAY, SC ......................................................................                                     4,315               4,315




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00043              Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                       44
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                        [In thousands of dollars]

                                                                                                                                                                                                                                            Committee
                                                                                                                                         Item                                                                 Budget estimate            recommendation

                                                                              CHARLESTON HARBOR, SC .............................................................................................             ........................           9,145    *
                                                                              COOPER RIVER, CHARLESTON HARBOR, SC ..................................................................                          ........................           4,175    *
                                                                              INSPECTION OF COMPLETED WORKS, SC .......................................................................                       ........................              65    †
                                                                              PROJECT CONDITION SURVEYS, SC ................................................................................                  ........................             875    *
                                                                                                                                 SOUTH DAKOTA
                                                                              BIG BEND DAM, LAKE SHARPE, SD ................................................................................                               13,412               13,412
                                                                              COLD BROOK LAKE, SD ..................................................................................................                            386                386
                                                                              COTTONWOOD SPRINGS LAKE, SD ..................................................................................                                    257                257
                                                                              FORT RANDALL DAM, LAKE FRANCIS CASE, SD .............................................................                                        22,264               22,264
                                                                              INSPECTION OF COMPLETED WORKS, SD .......................................................................                       ........................             224    †
                                                                              LAKE TRAVERSE, SD & MN ............................................................................................                               687                687
                                                                              OAHE DAM AND LAKE OAHE, SD ....................................................................................                              13,386               13,386
                                                                              SCHEDULING RESERVOIR OPERATIONS, SD ...................................................................                         ........................             158    †
                                                                                                                                    TENNESSEE
                                                                              CENTER HILL LAKE, TN ...................................................................................................                       7,806               7,806
                                                                              CHEATHAM LOCK AND DAM, TN .....................................................................................                              15,984               15,984
                                                                              CORDELL HULL DAM AND RESERVOIR, TN .....................................................................                                       8,610               8,610
                                                                              DALE HOLLOW LAKE, TN .................................................................................................                         8,292               8,292
                                                                              INSPECTION OF COMPLETED WORKS, TN .......................................................................                                      6,481               6,481
                                                                              J PERCY PRIEST DAM AND RESERVOIR, TN ...................................................................                        ........................             294    †
                                                                              NORTHWEST TENNESSEE REGIONAL HARBOR, LAKE COUNTY, TN .................................                                          ........................             540    *
                                                                              OLD HICKORY LOCK AND DAM, TN .................................................................................                               11,870               11,870
                                                                              PROJECT CONDITION SURVEYS, TN ................................................................................                  ........................               5    *
                                                                              TENNESSEE RIVER, TN ...................................................................................................                      27,738               27,738
                                                                              WOLF RIVER HARBOR, TN ..............................................................................................            ........................             655    *
                                                                                                                                        TEXAS
                                                                              AQUILLA LAKE, TX ...........................................................................................................                   2,169               2,169
                                                                              BARDWELL LAKE, TX .......................................................................................................                      3,972               3,972
                                                                              BELTON LAKE, TX ...........................................................................................................                    4,455               4,455
                                                                              BENBROOK LAKE, TX ......................................................................................................                       3,091               3,091
                                                                              BRAZOS ISLAND HARBOR, TX .........................................................................................              ........................           4,135    *
                                                                              BUFFALO BAYOU AND TRIBUTARIES, TX .........................................................................                                    3,906               3,906
                                                                              CANYON LAKE, TX ...........................................................................................................                    5,614               5,614
                                                                              CEDAR BAYOU, TX ..........................................................................................................      ........................           3,150    *
                                                                              CHANNEL TO HARLINGEN, TX .........................................................................................              ........................           1,100    *
                                                                              CHANNEL TO PORT BOLIVAR, TX ....................................................................................                ........................             600    *
                                                                              CORPUS CHRISTI SHIP CHANNEL, TX .............................................................................                   ........................           9,600    *
                                                                              DENISON DAM, LAKE TEXOMA, TX ..................................................................................                              10,216               10,216
                                                                              FERRELLS BRIDGE DAM, LAKE O’ THE PINES, TX ..........................................................                                          3,708               3,708
                                                                              FREEPORT HARBOR, TX ..................................................................................................          ........................           8,015    *
                                                                              GALVESTON HARBOR AND CHANNEL, TX ........................................................................                       ........................           7,175    *
                                                                              GIWW, CHANNEL TO VICTORIA, TX .................................................................................                 ........................             130    *
                                                                              GIWW, CHOCOLATE BAYOU, TX .......................................................................................               ........................              50    *
                                                                              GRANGER LAKE, TX ........................................................................................................                      2,628               2,628
                                                                              GRAPEVINE LAKE, TX ......................................................................................................                      2,607               2,607
                                                                              GULF INTRACOASTAL WATERWAY, TX .............................................................................                                 29,250               29,250
                                                                              HORDS CREEK LAKE, TX .................................................................................................                         1,712               1,712
                                                                              HOUSTON SHIP CHANNEL, TX .........................................................................................              ........................          23,750    *
                                                                              INSPECTION OF COMPLETED WORKS, TX .......................................................................                       ........................           1,573    †
                                                                              JIM CHAPMAN LAKE, TX ..................................................................................................                        2,307               2,307
                                                                              JOE POOL LAKE, TX ........................................................................................................                     6,748               6,748
                                                                              LAKE KEMP, TX ...............................................................................................................                     261                261
                                                                              LAVON LAKE, TX .............................................................................................................                   3,699               3,699
                                                                              LEWISVILLE DAM, TX ......................................................................................................                      4,094               4,094
                                                                              MATAGORDA SHIP CHANNEL, TX ....................................................................................                 ........................           4,255    *
                                                                              NAVARRO MILLS LAKE, TX ..............................................................................................                          2,871               2,871
                                                                              NORTH SAN GABRIEL DAM AND LAKE GEORGETOWN, TX ..............................................                                                   2,703               2,703
                                                                              O C FISHER DAM AND LAKE, TX ....................................................................................                               1,336               1,336




amozie on DSK123TN23PROD with REPORTS
                                                                              PAT MAYSE LAKE, TX ......................................................................................................                      1,439               1,439




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000             Frm 00044             Fmt 6604             Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                           45
                                                                                                           CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                            [In thousands of dollars]

                                                                                                                                                                                                                                                  Committee
                                                                                                                                            Item                                                                    Budget estimate            recommendation

                                                                              PROCTOR LAKE, TX .........................................................................................................                           3,393               3,393
                                                                              PROJECT CONDITION SURVEYS, TX ................................................................................                        ........................             325    *
                                                                              RAY ROBERTS LAKE, TX .................................................................................................                               1,570               1,570
                                                                              SABINE—NECHES WATERWAY, TX .................................................................................                          ........................           8,900    *
                                                                              SAM RAYBURN DAM AND RESERVOIR, TX .....................................................................                                              7,448               7,448
                                                                              SCHEDULING RESERVOIR OPERATIONS, TX ....................................................................                              ........................             592    †
                                                                              SOMERVILLE LAKE, TX ....................................................................................................                             3,352               3,352
                                                                              STILLHOUSE HOLLOW DAM, TX .......................................................................................                                    2,892               2,892
                                                                              TEXAS CITY SHIP CHANNEL, TX ......................................................................................                    ........................           5,500    *
                                                                              TOWN BLUFF DAM, B A STEINHAGEN LAKE, TX .............................................................                                                3,402               3,402
                                                                              WACO LAKE, TX ..............................................................................................................                         3,961               3,961
                                                                              WALLISVILLE LAKE, TX ....................................................................................................                            2,946               2,946
                                                                              WHITNEY LAKE, TX ..........................................................................................................                          7,090               7,090
                                                                              WRIGHT PATMAN DAM AND LAKE, TX .............................................................................                                         5,664               5,664
                                                                                                                                           UTAH
                                                                              INSPECTION OF COMPLETED WORKS, UT .......................................................................                             ........................              40    †
                                                                              SCHEDULING RESERVOIR OPERATIONS, UT ....................................................................                              ........................             410    †
                                                                                                                                        VERMONT
                                                                              BALL MOUNTAIN, VT .......................................................................................................                               986                986
                                                                              GORDONS LANDING, VT ..................................................................................................                ........................             250    *
                                                                              INSPECTION OF COMPLETED WORKS, VT .......................................................................                             ........................               9    †
                                                                              NORTH HARTLAND LAKE, VT ...........................................................................................                                     884                884
                                                                              NORTH SPRINGFIELD LAKE, VT .......................................................................................                                      949                949
                                                                              TOWNSHEND LAKE, VT ....................................................................................................                                 988                988
                                                                              UNION VILLAGE DAM, VT ................................................................................................                                  817                817
                                                                                                                                   VIRGIN ISLANDS
                                                                              INSPECTION OF COMPLETED WORKS, VI ........................................................................                            ........................               36   †
                                                                              PROJECT CONDITION SURVEYS, VI .................................................................................                       ........................               50   *
                                                                                                                                        VIRGINIA
                                                                              ATLANTIC INTRACOASTAL WATERWAY—ACC, VA ...........................................................                                                   3,015               3,015
                                                                              ATLANTIC INTRACOASTAL WATERWAY—DSC, VA ...........................................................                                                   1,754               1,754
                                                                              BENNETTS CREEK, VA ....................................................................................................               ........................             420    *
                                                                              CHINCOTEAGUE INLET, VA ..............................................................................................                 ........................             680    *
                                                                              DAVIS CREEK, VA ...........................................................................................................           ........................             265    *
                                                                              GATHRIGHT DAM AND LAKE MOOMAW, VA .....................................................................                                              2,749               2,749
                                                                              HAMPTON ROADS DRIFT REMOVAL, VA ..........................................................................                            ........................           2,632    *
                                                                              HAMPTON ROADS PREVENTION OF OBSTRUCTIVE DEPOSITS, VA ..................................                                               ........................             130    *
                                                                              INSPECTION OF COMPLETED WORKS, VA .......................................................................                             ........................             381    †
                                                                              JAMES RIVER CHANNEL, VA ...........................................................................................                   ........................           8,025    *
                                                                              JOHN H KERR LAKE, VA & NC ........................................................................................                                 12,131               12,131
                                                                              JOHN W FLANNAGAN DAM AND RESERVOIR, VA ............................................................                                                  7,864               7,864
                                                                              LYNNHAVEN INLET, VA ....................................................................................................              ........................           5,425    *
                                                                              NORFOLK HARBOR, VA ...................................................................................................                ........................          26,700    *
                                                                              NORTH FORK OF POUND RIVER LAKE, VA ......................................................................                                               698                698
                                                                              PHILPOTT LAKE, VA .........................................................................................................                          4,833               4,833
                                                                              PROJECT CONDITION SURVEYS, VA ................................................................................                        ........................           1,229    *
                                                                              RUDEE INLET, VA ............................................................................................................          ........................             580
                                                                              WATER AND ENVIRONMENTAL CERTIFICATIONS, VA .......................................................                                    ........................             200    *
                                                                              YORK RIVER ENTRANCE CHANNEL, VA ...........................................................................                           ........................             300    *
                                                                                                                                     WASHINGTON
                                                                              CHIEF JOSEPH DAM, WA .................................................................................................                                  676                676
                                                                              COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW VANCOUVER, WA & PORTLAND,
                                                                                OR ..............................................................................................................................   ........................          56,665    *
                                                                              COLUMBIA RIVER AT BAKER BAY, WA & OR .................................................................                                ........................             849    *
                                                                              COLUMBIA RIVER BETWEEN CHINOOK AND SAND ISLAND, WA .....................................                                              ........................           1,894    *
                                                                              COLUMBIA RIVER BETWEEN VANCOUVER, WA AND THE DALLES, OR ...........................                                                   ........................           1,117    *




amozie on DSK123TN23PROD with REPORTS
                                                                              EVERETT HARBOR AND SNOHOMISH RIVER, WA ............................................................                                   ........................           2,513    *




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272              PO 00000              Frm 00045               Fmt 6604             Sfmt 6602              U:\SR036.XXX                 SR036
                                                                                                                                                                         46
                                                                                                          CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                          [In thousands of dollars]

                                                                                                                                                                                                                                               Committee
                                                                                                                                           Item                                                                  Budget estimate            recommendation

                                                                              GRAYS HARBOR, WA .......................................................................................................           ........................          18,851    *
                                                                              HOWARD HANSON DAM, WA ...........................................................................................                                 9,065               9,065
                                                                              ICE HARBOR LOCK AND DAM, WA ..................................................................................                                    5,012               5,012
                                                                              INSPECTION OF COMPLETED WORKS, WA ......................................................................                           ........................           1,223    †
                                                                              LAKE RIVER, WA (PORT OF RIDGEFIELD) .......................................................................                        ........................             124
                                                                              LAKE WASHINGTON SHIP CANAL, WA .............................................................................                                      1,314              11,199    *
                                                                              LITTLE GOOSE LOCK AND DAM, WA ...............................................................................                                     3,133               3,133
                                                                              LOWER GRANITE LOCK AND DAM, WA ............................................................................                                       3,559               3,559
                                                                              LOWER MONUMENTAL LOCK AND DAM, WA ...................................................................                                             3,095               3,095
                                                                              MILL CREEK LAKE, WA ...................................................................................................                           2,849               2,849
                                                                              MOUNT SAINT HELENS SEDIMENT CONTROL, WA ...........................................................                                                  918                918
                                                                              MUD MOUNTAIN DAM, WA ..............................................................................................                             13,409               13,049
                                                                              PROJECT CONDITION SURVEYS, WA ...............................................................................                      ........................             810    *
                                                                              PUGET SOUND AND TRIBUTARY WATERS, WA ................................................................                              ........................           1,276    *
                                                                              QUILLAYUTE RIVER, WA ..................................................................................................            ........................           2,334    *
                                                                              SCHEDULING RESERVOIR OPERATIONS, WA ...................................................................                            ........................             493    *
                                                                              SEATTLE HARBOR, WA ....................................................................................................            ........................             378    †
                                                                              STILLAGUAMISH RIVER, WA ............................................................................................                                 299                299
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, WA ...............................................                                       ........................              53    *
                                                                              SWINOMISH CHANNEL, WA .............................................................................................                ........................             215
                                                                              TACOMA, PUYALLUP RIVER, WA .....................................................................................                                     364                364
                                                                              THE DALLES LOCK AND DAM, WA & OR ........................................................................                                         4,033               4,033
                                                                              WILLAPA RIVER AND HARBOR, WA .................................................................................                     ........................           3,290    *
                                                                                                                                  WEST VIRGINIA
                                                                              BEECH FORK LAKE, WV ..................................................................................................                            1,534               1,534
                                                                              BLUESTONE LAKE, WV ....................................................................................................                           2,883               2,883
                                                                              BURNSVILLE LAKE, WV ...................................................................................................                           2,944               2,944
                                                                              EAST LYNN LAKE, WV .....................................................................................................                          3,098               3,098
                                                                              ELKINS, WV .....................................................................................................................                       70                70
                                                                              INSPECTION OF COMPLETED WORKS, WV ......................................................................                           ........................             536    †
                                                                              KANAWHA RIVER LOCKS AND DAMS, WV .......................................................................                                        17,043               23,943
                                                                              OHIO RIVER LOCKS AND DAMS, WV, KY & OH ..............................................................                                           57,656               57,656
                                                                              OHIO RIVER OPEN CHANNEL WORK, WV, KY & OH ........................................................                                                2,726               2,726
                                                                              R D BAILEY LAKE, WV ....................................................................................................                          2,760               2,760
                                                                              STONEWALL JACKSON LAKE, WV .....................................................................................                                  1,832               1,832
                                                                              SUMMERSVILLE LAKE, WV ..............................................................................................                              2,752               2,752
                                                                              SUTTON LAKE, WV ..........................................................................................................                        3,609               3,609
                                                                              TYGART LAKE, WV ...........................................................................................................                       2,351               2,351
                                                                                                                                     WISCONSIN
                                                                              ASHLAND HARBOR, WI ....................................................................................................            ........................           1,020    *
                                                                              EAU GALLE RIVER LAKE, WI ...........................................................................................                              1,026               1,026
                                                                              FOX RIVER, WI ................................................................................................................                    3,444               3,444
                                                                              GREEN BAY HARBOR, WI ................................................................................................              ........................           3,101    *
                                                                              INSPECTION OF COMPLETED WORKS, WI .......................................................................                          ........................              45    †
                                                                              KENOSHA HARBOR, WI ...................................................................................................             ........................             730    *
                                                                              KEWAUNEE HARBOR, WI .................................................................................................              ........................             462    *
                                                                              MANITOWOC HARBOR, WI ...............................................................................................               ........................             830    *
                                                                              MILWAUKEE HARBOR, WI ................................................................................................              ........................           3,112    *
                                                                              PORT WING HARBOR, WI ................................................................................................              ........................              25    *
                                                                              PROJECT CONDITION SURVEYS, WI ................................................................................                     ........................             359    *
                                                                              STURGEON BAY HARBOR AND LAKE MICHIGAN SHIP CANAL, WI ..................................                                                                18               629    *
                                                                              SURVEILLANCE OF NORTHERN BOUNDARY WATERS, WI ................................................                                      ........................             408    *
                                                                              TWO RIVERS HARBOR, WI ..............................................................................................               ........................              20
                                                                                                                                      WYOMING
                                                                              INSPECTION OF COMPLETED WORKS, WY ......................................................................                           ........................              70    †
                                                                              JACKSON HOLE LEVEES, WY ...........................................................................................                               1,678               1,678
                                                                              SCHEDULING RESERVOIR OPERATIONS, WY ...................................................................                            ........................             112    †




amozie on DSK123TN23PROD with REPORTS
                                                                                          SUBTOTAL, PROJECTS LISTED UNDER STATES ..................................................                                      2,336,969              4,050,405




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00046              Fmt 6604             Sfmt 6602             U:\SR036.XXX                 SR036
                                                                                                                                                                      47
                                                                                                         CORPS OF ENGINEERS—OPERATION AND MAINTENANCE—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                                                                                          Committee
                                                                                                                                        Item                                                                Budget estimate            recommendation

                                                                                                                              REMAINING ITEMS
                                                                              ADDITIONAL FUNDING FOR ONGOING WORK ...................................................................                       ........................   ........................
                                                                              NAVIGATION MAINTENANCE ............................................................................................           ........................                40,000
                                                                              DEEP–DRAFT HARBOR AND CHANNEL ............................................................................                    ........................              172,052
                                                                              DONOR AND ENERGY TRANSFER PORTS ........................................................................                      ........................                50,000
                                                                              INLAND WATERWAYS .......................................................................................................      ........................                25,000
                                                                                    SMALL, REMOTE, OR SUBSISTENCE NAVIGATION ..................................................                             ........................                60,000
                                                                              OTHER AUTHORIZED PURPOSES .....................................................................................               ........................                40,000
                                                                              AQUATIC NUISANCE CONTROL RESEARCH .....................................................................                                         100                   17,500
                                                                              ASSET MANAGEMENT/FACILITIES AND EQUIP MAINT (FEM) ...........................................                                 ........................                  1,000
                                                                              BUDGET/MANAGEMENT SUPPORT FOR O&M BUSINESS PROGRAMS ..............................                                            ........................   ........................
                                                                              STEWARDSHIP SUPPORT PROGRAM ................................................................................                                    900                        900
                                                                              PERFORMANCE–BASED BUDGETING SUPPORT PROGRAM ..............................................                                    ........................   ........................
                                                                              RECREATION MANAGEMENT SUPPORT PROGRAM ..........................................................                                             1,000                      1,000
                                                                              OPTIMIZATION TOOLS FOR NAVIGATION ..........................................................................                                    350                        350
                                                                              CIVIL WORKS WATER MANAGEMENT SYSTEM (CWWMS) ................................................                                                 8,000                      8,000
                                                                              COASTAL INLET RESEARCH PROGRAM ...........................................................................                                      100                   10,975
                                                                              COASTAL OCEAN DATA SYSTEM (CODS) .........................................................................                                   2,500                      7,500
                                                                              CULTURAL RESOURCES (NAGPRA/CURATION) ................................................................                                           900                        900
                                                                              CYBERSECURITY .............................................................................................................                  4,000                      4,000
                                                                              DREDGE MCFARLAND READY RESERVE .........................................................................                      ........................                11,000        *
                                                                              DREDGE WHEELER READY RESERVE ..............................................................................                   ........................                14,000        *
                                                                              DREDGING DATA AND LOCK PERFORMANCE MONITORING SYSTEM ...............................                                                         1,100                      4,300
                                                                              DREDGING OPERATIONS AND ENVIRONMENTAL RESEARCH (DOER) ..............................                                                         5,000                      5,000
                                                                              DREDGING OPERATIONS TECHNICAL SUPPORT PROGRAM (DOTS) .................................                                                          100                     6,950
                                                                              EARTHQUAKE HAZARDS REDUCTION PROGRAM .............................................................                                              100                        300
                                                                              ENGINEERING WITH NATURE ..........................................................................................            ........................                12,500
                                                                              ELECTRIC VEHICLE FLEET AND CHARGING INFRASTRUCTURE .......................................                                                   8,000                      8,000
                                                                              FACILITY PROTECTION ....................................................................................................                     4,200                      4,200
                                                                              FISH & WILDLIFE OPERATING FISH HATCHERY REIMBURSEMENT .................................                                                      5,400                      5,400
                                                                              HARBOR MAINTENANCE FEE DATA COLLECTION ............................................................                           ........................                     795      *
                                                                              INLAND WATERWAY NAVIGATION CHARTS ......................................................................                                     4,000                      4,800
                                                                              INSPECTION OF COMPLETED FEDERAL FLOOD CONTROL PROJECTS ..............................                                                      18,000                     18,000
                                                                              INSPECTION OF COMPLETED WORKS ..............................................................................                               32,500        ........................   ‡
                                                                              MONITORING OF COMPLETED NAVIGATION PROJECTS ....................................................                                                100                   12,000
                                                                              NATIONAL COASTAL MAPPING PROGRAM .......................................................................                                     4,000                    15,000
                                                                              NATIONAL DAM SAFETY PROGRAM (PORTFOLIO RISK ASSESSMENT) .............................                                                      10,000                     10,000
                                                                              NATIONAL EMERGENCY PREPAREDNESS PROGRAM (NEPP) ...........................................                                                   5,500                      5,500
                                                                              NATIONAL (LEVEE) FLOOD INVENTORY ...........................................................................                                 4,500                      4,500
                                                                              NATIONAL (MULTIPLE PROJECT) NATURAL RESOURCES MANAGEMENT ACTIVITIES .......                                                                  2,500                      2,500
                                                                              NATIONAL PORTFOLIO ASSESSMENT FOR REALLOCATIONS ............................................                                                    600                        600
                                                                              REGIONAL SEDIMENT MANAGEMENT PROGRAM .............................................................                                              100                     6,700
                                                                              RESPONSE TO CLIMATE CHANGE AT CORPS PROJECTS .................................................                                               6,000                      6,000
                                                                              REVIEW OF NON–FEDERAL ALTERATIONS OF CIVIL WORKS PROJECTS (SECTION 408)                                                                    10,000                     10,000
                                                                              SCHEDULING RESERVOIR OPERATIONS ..........................................................................                                   8,500       ........................   ‡
                                                                              SOIL MOISTURE AND SNOWPACK MONITORING ..............................................................                                         5,000                      8,000
                                                                              SUSTAINABLE RIVERS PROGRAM (SRP) .........................................................................                                      500                        500
                                                                              VETERAN’S CURATION PROGRAM AND COLLECTIONS MANAGEMENT .............................                                                          6,500                      6,500
                                                                              WATERBORNE COMMERCE STATISTICS ..........................................................................                                    4,670                      4,670
                                                                              WATER OPERATIONS TECHNICAL SUPPORT (WOTS) .......................................................                                               500                     5,500

                                                                                          SUBTOTAL, REMAINING ITEMS ..........................................................................                        165,220                    632,392

                                                                                          TOTAL, OPERATION AND MAINTENANCE ............................................................                             2,502,189                  4,682,797
                                                                                 * Includes funds requested in other accounts.
                                                                                 † Requested in remaining items.
                                                                                 ‡ Funded under projects listed under states.

                                                                                Arkansas Red River Chloride Control.—The Committee reminds
                                                                              the Corps of their existing obligations to continue operations and




amozie on DSK123TN23PROD with REPORTS
                                                                              maintenance activities for the Red River Chloride Control project,




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00047             Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                              48

                                                                              Oklahoma and Texas, at Federal expense and encourages the Corps
                                                                              to prioritize funding for these projects when allocating additional
                                                                              funding recommended in this account.
                                                                                 Aquatic Nuisance Control Research.—Harmful Algal Blooms
                                                                              [HABs] continue to threaten local communities, ecosystems, human
                                                                              health, drinking water sources, and local outdoor economies across
                                                                              the Nation. These algae overgrowths produce dangerous toxins in
                                                                              fresh and marine waters that can sicken or kill people and ani-
                                                                              mals, create dead zones, and raise treatment costs for drinking
                                                                              water. The devastating effects of HABs occur across multiple
                                                                              ecoregions from large freshwater lakes like the Finger Lakes in
                                                                              New York and Lake Okeechobee in Florida to large inland water-
                                                                              ways like the Ohio River where a 2015 HAB event persisted for
                                                                              over a month involving over 700 miles of waterway. The Committee
                                                                              continues to support the Corps’ efforts to address gaps in critical
                                                                              HAB research to avoid, detect, and address HAB occurrences.
                                                                                 The additional funding recommended in the Aquatic Nuisance
                                                                              Control Research remaining item is to supplement and advance
                                                                              Corps activities to address HABs including: early detection, preven-
                                                                              tion, and management techniques and procedures to reduce the oc-
                                                                              currence and impacts of harmful algal blooms in our nation’s water
                                                                              resources; work with university partners to develop prediction,
                                                                              avoidance and remediation measures focused on environmental
                                                                              triggers in riverine ecosystems; and to advance state-of-the-art
                                                                              UAS based detection, monitoring, and mapping of invasive aquatic
                                                                              plant species in conjunction with University partners.
                                                                                 Asset Management/FEM.—The Committee is frustrated by the
                                                                              lack of progress of the Corps in performing a review of their inven-
                                                                              tory, in accordance with Section 6002 of the WRRDA of 2014, as
                                                                              has been directed in previous Committee Reports. The Committee
                                                                              notes that the Corps was previously provided $1,000,000 to carry
                                                                              out these activities and understands $350,000 is needed in fiscal
                                                                              year 2022 which has been recommended under Asset Management/
                                                                              Facilities and Equipment Maintenance [FEM]. The Corps is di-
                                                                              rected to provide an interim progress report that includes details
                                                                              on the percentage of this work that has already been done and a
                                                                              timeline for completion of the inventory to the Committee no later
                                                                              than 60 days after enactment of this act.
                                                                                 Coastal Inlet Research Program.—The Committee understands
                                                                              that communities, infrastructure, commerce, and resources that are
                                                                              tied to the coastal nearshore region are all vulnerable to damage
                                                                              from extreme coastal events and long-term coastal change. Funding
                                                                              in addition to the budget request is recommended for the Corps-led,
                                                                              multi-university effort to identify engineering frameworks to ad-
                                                                              dress coastal resilience needs; to develop adaptive pathways that
                                                                              lead to coastal resilience; that measure the coastal forces that lead
                                                                              to infrastructure damage and erosion during extreme storm events;
                                                                              and to improve coupling of terrestrial and coastal models. Funding
                                                                              in addition to the budget request is also recommended for the
                                                                              Corps to continue work with the National Oceanic and Atmospheric
                                                                              Administration’s National Water Center on protecting the Nation’s
                                                                              water resources.
                                                                                 Debris Removal.—The Committee reminds the Corps that section




amozie on DSK123TN23PROD with REPORTS
                                                                              1164 of the WIIN Act enhanced the Corps’ authority to remove ‘‘ac-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00048   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              49

                                                                              cumulated snags, obstructions, and other debris located in or adja-
                                                                              cent to a Federal channel in the interest of navigation, flood con-
                                                                              trol, or recreation.’’ The Committee encourages the Corps to com-
                                                                              plete ongoing bridge removal projects; and when removing bridges
                                                                              and bridge pilings, to consider also removing other pilings and ob-
                                                                              structions in close proximity to the bridge, and in or adjacent to the
                                                                              Federal navigation channel pursuant to this authority.
                                                                                 Enhanced Options for Sand Acquisition for Beach Renourishment
                                                                              Projects.—The Committee urges the Corps to provide States with
                                                                              guidance and recommendations to implement cost effective meas-
                                                                              ures and planning for sand management.
                                                                                 Engineering With Nature.—The Committee recommendation in-
                                                                              cludes $12,500,000 as a new remaining item in this account to sup-
                                                                              port the Corps’ Engineering with Nature [EWN] initiative. The
                                                                              Committee is impressed with the positive impact on the environ-
                                                                              ment and the extensive cost savings this program provides. With
                                                                              the funds recommended, the Corps is encouraged to continue col-
                                                                              laboration across research programs on nature-based infrastructure
                                                                              and with university partners to develop standards, design guid-
                                                                              ance, and testing protocols to fully evaluate and standardize na-
                                                                              ture-based and hybrid infrastructure solutions, including those in
                                                                              drought and fire-prone lands and post-fire recovery areas. Addition-
                                                                              ally, the Corps is encouraged to expand the EWN initiative to sup-
                                                                              port science and engineering practices that support long-term resil-
                                                                              ience and sustainability of water infrastructure and their sup-
                                                                              porting systems. Funding under this line item is intended for EWN
                                                                              activities having a national or regional scope or which benefit the
                                                                              Corps’ broader execution of its mission areas. It is not intended to
                                                                              replace or preclude the appropriate use of EWN practices at dis-
                                                                              tricts using project-specific funding, or work performed across other
                                                                              Corps programs that might involve EWN. The Committee encour-
                                                                              ages the Corps to identify EWN efforts in future budget requests.
                                                                              Of the funding recommended, $5,000,000 is included to support on-
                                                                              going research and advance work with university partners to de-
                                                                              velop standards, design guidance, and testing protocols to improve
                                                                              and standardize nature-based and hybrid infrastructure solutions.
                                                                                 Flood and Earthquake Modeling.—Additional funds are rec-
                                                                              ommended in the Earthquake Hazards Reduction Program to facili-
                                                                              tate coordination with the Levee Safety program to develop a plan
                                                                              for leveraging existing knowledge related to potential seismic con-
                                                                              cerns relevant to levees. The Corps is encouraged to evaluate
                                                                              whether earthquake model would aid in assessment and if collabo-
                                                                              ration with Universities would be beneficial.
                                                                                 Forecast Informed Reservoir Operations.—The Committee is
                                                                              pleased with the results of FIRO Phases 1 and 2 and is interested
                                                                              in how the program can be leveraged to other areas. Particularly
                                                                              if there are regions where different storm types, in addition to At-
                                                                              mospheric Rivers, are key to heavy rain and flooding (e.g., tropical
                                                                              storms/hurricanes, large thunderstorm systems), and where longer
                                                                              forecast lead times may be required. The Corps shall brief the
                                                                              Committees on Appropriations of both Houses of Congress no later
                                                                              than 60 days following enactment on the details of continuing and
                                                                              potentially expanding FIRO and related efforts. The briefing shall




amozie on DSK123TN23PROD with REPORTS
                                                                              include how FIRO could be expanded to include assessments of at




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00049   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              50

                                                                              least two major systems of dams (representing at least a dozen
                                                                              dams in total), for which coordination across several dams in the
                                                                              larger watershed is required and focus on the potential to predict
                                                                              extreme precipitation and flood to better anticipate to what degree
                                                                              FIRO might be applicable across reservoirs nationally.
                                                                                 Integrated Navigation Analysis and Systems Enhancements.—
                                                                              The Committee recommends additional funds in the remaining
                                                                              item Dredging Data and Lock Performance Monitoring System and
                                                                              in the remaining item Dredging Operations Technical Support Pro-
                                                                              gram to continue work laying the foundation for prototype applica-
                                                                              tions for machine learning techniques as it relates to sedimenta-
                                                                              tion-dredging patterns, dredging operations trends, and lock oper-
                                                                              ations, including enhancements to systems to provide additional
                                                                              analytical capabilities and integrates data across enterprise naviga-
                                                                              tion systems.
                                                                                 Inspection of Completed Environmental Projects.—The Committee
                                                                              is concerned about the absence of funding for the Inspection of
                                                                              Completed Environmental Projects program in the administration’s
                                                                              budget request. The program is intended to ensure that non-Fed-
                                                                              eral sponsors operate and maintain aquatic ecosystem restoration
                                                                              projects in accordance with the Operations, Maintenance, Repair,
                                                                              Rehabilitation, and Replacement manual, thereby ensuring that
                                                                              the Federal investment is protected and presumably providing the
                                                                              benefits intended. The Corps is encouraged to include funding in
                                                                              future budget requests.
                                                                                 Invasive Species Mitigation.—The Committee recognizes that the
                                                                              Corps is engaged in a multipronged effort to combat invasive spe-
                                                                              cies in our country’s waterways and protect the Mississippi River
                                                                              Basin, which is one of the most valued ecosystems in the world.
                                                                              The Committee recommends $500,000 for the Corps, in partnership
                                                                              with other Federal partners, to begin planning, design, initial engi-
                                                                              neering and project management for construction of carp barriers
                                                                              in the Mississippi River Basin and the Tennessee-Tombigbee wa-
                                                                              terway.
                                                                                 Kennebec River Long-Term Maintenance Dredging.—The Com-
                                                                              mittee continues to support the Memorandum of Agreement signed
                                                                              in January 2019 denoting responsibilities between the Department
                                                                              of the Army and the Department of the Navy for the regular main-
                                                                              tenance of the Kennebec River Federal Navigation Channel. Main-
                                                                              tenance dredging of the Kennebec is essential to the safe passage
                                                                              of newly constructed Navy guided missile destroyers to the Atlantic
                                                                              Ocean. The Committee directs the Secretary to continue its collabo-
                                                                              ration with the Department of the Navy to ensure regular mainte-
                                                                              nance dredging of the Kennebec.
                                                                                 Levee Safety Program.—In fiscal year 2020, Congress provided
                                                                              $15,000,000 to implement levee safety initiatives to meet the re-
                                                                              quirements under section 3016 of WRRDA. The Committee under-
                                                                              stands these funds are sufficient to complete Phase II activities.
                                                                                 Low Reservoir Water Level Issues.—The Committee encourages
                                                                              the Corps to ensure adequate resources to address issues at Corps
                                                                              projects when low water levels occur, such as additional terrestrial




amozie on DSK123TN23PROD with REPORTS
                                                                              noxious weed control and sediment removal activities.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00050   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              51

                                                                                 Mobile Bay Beneficial Use of Dredged Material.—The Committee
                                                                              encourages the Corps to examine beneficial uses of dredged mate-
                                                                              rial in Mobile Bay, Alabama.
                                                                                 Monitoring of Completed Navigation Projects—Fisheries.—The
                                                                              Committee is concerned that a reduction in or elimination of navi-
                                                                              gational lock operations on the Nation’s inland waterways is hav-
                                                                              ing a negative impact on river ecosystems, particularly the ability
                                                                              of endangered, threatened, and game fish species to migrate
                                                                              through waterways, particularly during critical spawning periods.
                                                                              The Committee notes the success of preliminary research which in-
                                                                              dicates reduced lock operations on certain Corps-designated low-
                                                                              use waterways is directly impacting migration and that there are
                                                                              effective means to mitigate the impacts. The Committee continues
                                                                              to believe that maximizing the ability of fish to use these locks to
                                                                              move past the dams has the potential to restore natural and his-
                                                                              toric long-distance river migrations that may be critical to species
                                                                              survival. In fiscal year 2021, the Committee recommended funding
                                                                              to continue this research on the impact of reduced lock operations
                                                                              on riverine fish.
                                                                                 The Committee understands this research has proven valuable
                                                                              and, within available funds for ongoing work, directs the Corps to
                                                                              continue this research at not less than the fiscal year 2021 level.
                                                                              The goal of the continued funding is to support the ongoing re-
                                                                              search and, where appropriate, expand the work to look at eco-
                                                                              system level impacts and additional waterways, lock structures,
                                                                              lock operation methods, and fish species that will more fully inform
                                                                              the Corps’ operations.
                                                                                 Monitoring of Completed Navigation Projects—Structural Health
                                                                              Monitoring.—Of the funding recommended, $4,000,000 shall be to
                                                                              support the structural health monitoring program to facilitate re-
                                                                              search to maximize operations, enhance efficiency, and protect
                                                                              asset life through catastrophic failure mitigation. The Corps is en-
                                                                              couraged to include funding for these activities in future budget re-
                                                                              quests.
                                                                                 National Coastal Mapping Program.—Of the additional funds
                                                                              recommended in the National Coastal Mapping Program remaining
                                                                              item, $5,000,000 shall be for Arctic coastal mapping needs. The
                                                                              Committee notes the Corps has responsibility for some mapping
                                                                              but, in general, does not include shoreline. Before the Corps obli-
                                                                              gates funds to map shoreline in Alaska, the Assistant Secretary of
                                                                              the Army for Civil Works shall provide notice to the Committee.
                                                                              The notice shall include certification that the effort is coordinated
                                                                              with NOAA and compliments those efforts.
                                                                                 Recreational Boating.—The Committee encourages the Corps to
                                                                              complete the ongoing inventory of all federally managed rec-
                                                                              reational boating infrastructure and facilities. The Committee is in-
                                                                              terested in the findings related to the assessment of annual oper-
                                                                              ation and maintenance needs associated with such infrastructure
                                                                              and facilities, deferred operation and maintenance needs for such
                                                                              infrastructure and facilities to operate safely at full capacity, oppor-
                                                                              tunities to expand capacity at existing access points, and economic
                                                                              impact of recreation to local and regional economies and benefits
                                                                              of sustaining and improving public access at recreational infra-




amozie on DSK123TN23PROD with REPORTS
                                                                              structure and facilities.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00051   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              52

                                                                                 Regional Sediment Management.—The Committee recommends
                                                                              $5,000,000 to continue Corps research and development into en-
                                                                              hanced forecasting capabilities to implement proactive strategies
                                                                              for flood risk management to enhance the resiliency of coastal com-
                                                                              munities and mitigate socioeconomic and environmental con-
                                                                              sequences of extreme coastal hazards. Funds are also provided to
                                                                              support cooperative efforts between the Corps and academia to ad-
                                                                              dress compound flooding issues.
                                                                                 Small, Remote, or Subsistence Harbors.—The Committee empha-
                                                                              sizes the importance of ensuring that our country’s small and low-
                                                                              use ports remain functional. The Committee urges the Corps to
                                                                              consider expediting scheduled maintenance at small and low-use
                                                                              ports that have experienced unexpected levels of deterioration since
                                                                              their last dredging. The Committee is concerned that the adminis-
                                                                              tration’s criteria for navigation maintenance disadvantage small,
                                                                              remote, or subsistence harbors and waterways from competing for
                                                                              scarce navigation maintenance funds. The Committee directs the
                                                                              Corps to revise the criteria used for determining which navigation
                                                                              maintenance projects are funded and to develop a reasonable and
                                                                              equitable allocation under the Operation and Maintenance account.
                                                                              The Committee supports including criteria to evaluate economic
                                                                              impact that these projects provide to local and regional economies.
                                                                                 Soil Moisture and Snowpack Monitoring Program.—The Com-
                                                                              mittee recommends $8,000,000 for the continued fielding of the
                                                                              Missouri River Snowpack and Soil Moisture Monitoring System.
                                                                              Providing these capabilities is critical to enabling the Corps to ac-
                                                                              curately forecast plains snowpack and soil moisture to improve
                                                                              runoff forecasts that inform management decisions on dam releases
                                                                              in order to protect Missouri River Basin states from the impacts of
                                                                              flooding and droughts.
                                                                                 Tuttle Creek Lake, KS.—The additional funding provided is for
                                                                              Water Injection Dredging efforts.
                                                                                 Water Control Manual Prioritization Report.—The Committee is
                                                                              pleased to see the Corps start to budget for the update of water
                                                                              control manuals. However, the Committee is perplexed and dis-
                                                                              appointed that the prioritized list of manuals that require updating
                                                                              has not been provided. This is particularly concerning because
                                                                              funds were provided for this purpose and it appears the Corps has
                                                                              used this information to budget for these updates. The Corps shall
                                                                              provide the comprehensive list of water control manuals at Corps-
                                                                              owned projects located in states where a Reclamation project is also
                                                                              located, including a prioritized list of needed updates of those
                                                                              manuals no later than 60 days following enactment.
                                                                                 Water Control Manuals, Section 7 Dams.—Many water control
                                                                              manuals are decades old and in need of updating, particularly in
                                                                              light of recent dam disasters and improvements in forecast-in-
                                                                              formed reservoir operations [FIRO]. Of the additional funds rec-
                                                                              ommended for Other Authorized Project Purposes $4,000,000 shall
                                                                              be for water control manual updates for a non-Corps owned high
                                                                              hazard dam where: (1) the Corps has a responsibility for flood con-
                                                                              trol operations under section 7 of the Flood Control Act of 1944; (2)
                                                                              the dam requires coordination of water releases with one or more




amozie on DSK123TN23PROD with REPORTS
                                                                              other high-hazard dams for flood control purposes; and (3) the dam




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00052   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              53

                                                                              owner is actively investigating the feasibility of applying forecast
                                                                              informed reservoir operations technology.
                                                                                 Water Operations Technical Support.—Funding in addition to the
                                                                              budget request is recommended for research into atmospheric riv-
                                                                              ers first funded in fiscal year 2015.
                                                                                 Additional Funding for Ongoing Work.—The Committee cannot
                                                                              support a level of funding that does not fund operation and mainte-
                                                                              nance of our Nation’s aging infrastructure sufficiently to ensure
                                                                              continued competitiveness in a global marketplace. Federal naviga-
                                                                              tion channels maintained at only a fraction of authorized dimen-
                                                                              sions and navigation locks and hydropower facilities being used
                                                                              well beyond their design life results in economic inefficiencies and
                                                                              risks infrastructure failure, which can cause substantial economic
                                                                              losses. The Committee recommendation includes additional funds
                                                                              for projects and activities to enhance the Nation’s economic growth
                                                                              and international competitiveness.
                                                                                 Of the additional funds recommended in this account for other
                                                                              authorized project purposes, not less than $2,000,000 shall be for
                                                                              efforts to combat invasive mussels at Corps-owned reservoirs.
                                                                                 When allocating the additional funding recommended in this ac-
                                                                              count, the Corps shall consider giving priority to the following:
                                                                                 —Ability to complete ongoing work maintaining authorized
                                                                                   depths and widths of harbors and shipping channels (including
                                                                                   small, remote, or subsistence harbors), including where con-
                                                                                   taminated sediments are present;
                                                                                 —Ability to address critical maintenance backlog;
                                                                                 —Presence of the U.S. Coast Guard;
                                                                                 —Extent to which the work will enhance national, regional, or
                                                                                   local economic development;
                                                                                 —Extent to which the work will promote job growth or inter-
                                                                                   national competitiveness;
                                                                                 —Number of jobs created directly by the funded activity;
                                                                                 —Ability to obligate the funds allocated within the fiscal year;
                                                                                 —Ability to complete the project, separable element, project
                                                                                   phase, or useful increment of work within the funds allocated;
                                                                                 —Dredging projects that would provide supplementary benefits
                                                                                   to tributaries and waterways in close proximity to ongoing is-
                                                                                   land replenishment projects; and
                                                                                 —Extent to which the work will promote recreation-based bene-
                                                                                   fits, including those created by recreational boating; and
                                                                                 —For harbor maintenance activities:
                                                                                   —Total tonnage handled;
                                                                                   —Total exports;
                                                                                   —Total imports;
                                                                                   —Dollar value of cargo handled;
                                                                                   —Energy infrastructure and national security needs served;
                                                                                   —Designation as strategic seaports;
                                                                                   —Lack of alternative means of freight movement;
                                                                                   —Savings over alternative means of freight movement; and
                                                                                   —Improvements to dredge disposal facilities which will result
                                                                                      in long-term savings, including a reduction in regular main-




amozie on DSK123TN23PROD with REPORTS
                                                                                      tenance costs.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00053   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                          54

                                                                                                                       REGULATORY PROGRAM

                                                                              Appropriations, 2021 .............................................................................       $210,000,000
                                                                              Budget estimate, 2022 ...........................................................................         204,400,000
                                                                              Committee recommendation .................................................................                212,000,000
                                                                                The Committee recommends $212,000,000 for the Regulatory
                                                                              Program. The Committee recommends funds above the budget re-
                                                                              quest to address capacity needs across the Corps related to staffing
                                                                              shortages in Corps districts. The Corps is encouraged to budget ap-
                                                                              propriately in order to process permits in a timely fashion.
                                                                                Notwithstanding any other provision of law, nothing shall pre-
                                                                              clude a non-Federal entity from developing and operating a
                                                                              pumped storage hydroelectric project in Gregory County, South Da-
                                                                              kota, utilizing Missouri River water pursuant to a Federal Power
                                                                              Act license, subject to all otherwise applicable license and permits,
                                                                              nor limit the entities to which project power can be sold.
                                                                                           FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

                                                                              Appropriations, 2021 .............................................................................     $250,000,000
                                                                              Budget estimate, 2022 ........................................................................... ...........................
                                                                              Committee recommendation .................................................................               260,000,000
                                                                                 The Committee recommends $260,000,000 for the Formerly Uti-
                                                                              lized Sites Remedial Action Program.
                                                                                                    FLOOD CONTROL AND COASTAL EMERGENCIES

                                                                              Appropriations, 2021 .............................................................................         $35,000,000
                                                                              Budget estimate, 2022 ...........................................................................           35,000,000
                                                                              Committee recommendation .................................................................                  35,000,000
                                                                                The Committee recommends $35,000,000 for Flood Control and
                                                                              Coastal Emergencies.
                                                                                                                                   EXPENSES

                                                                              Appropriations, 2021 .............................................................................       $206,000,000
                                                                              Budget estimate, 2022 ...........................................................................         199,290,000
                                                                              Committee recommendation .................................................................                216,000,000
                                                                                The Committee recommends $216,000,000 for Expenses. No
                                                                              funding is recommended for creation of an Office of Congressional
                                                                              Affairs.
                                                                                The Expenses appropriation is an administrative and operational
                                                                              account which supports the technical, administrative and staff su-
                                                                              pervision functions assigned to Corps Headquarters, the Major
                                                                              Subordinate Commands [MSCs/division offices]; and the costs of
                                                                              those elements within four field operating activities providing di-
                                                                              rect support to those functions. The Expenses appropriation pays
                                                                              for two categories of requirements—labor and non-labor—to sup-
                                                                              port the Corps.
                                                                                The most recent U.S. Army Manpower Analysis Agency
                                                                              [USAMAA] staffing analysis was conducted in 2011 to determine
                                                                              an efficient and effective organizational structure for the Corps,
                                                                              properly staffed to perform assigned missions and accomplish given
                                                                              workload under the appropriate command and control. This anal-
                                                                              ysis identified the need for 980 Full time equivalents [FTE] based
                                                                              on the needs facing the Corps’ Civil Works program in 2011, which




amozie on DSK123TN23PROD with REPORTS
                                                                              received an annual Civil Works appropriation of $5,100,000,000.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000      Frm 00054      Fmt 6604      Sfmt 6602     U:\SR036.XXX        SR036
                                                                                                                                          55

                                                                              The Corps has been operating with approximately 850 FTE, with
                                                                              a fiscal year 2020 appropriation of $7,650,000, not accounting for
                                                                              the over $20,000,000,000 in emergency supplemental funding they
                                                                              have received over the past 3 years. Thus, the Corps is working
                                                                              with nearly 130 fewer FTE than recommended and being required
                                                                              to execute at least 50 percent more work than the initial estimate
                                                                              was based on.
                                                                                The additional funds recommended in this account shall be used
                                                                              to support implementation of the Corps’ Civil Works program, in-
                                                                              cluding hiring additional FTE. This includes developing and
                                                                              issuing policy guidance; managing Civil Works program; and pro-
                                                                              viding national coordination of and participation in forums and
                                                                              events within headquarters, the division offices, and meeting other
                                                                              enterprise requirements and operating expenses. The Committee
                                                                              encourages the Corps to pursue updating the 2011 USMAA staffing
                                                                              analysis based on current Civil Works needs.
                                                                                The Committee moved $8,000,000 provided in the budget rec-
                                                                              ommendation for electric vehicles and charging stations to this ac-
                                                                              count. These activities align with the replacement and mainte-
                                                                              nance of the current fleet of vehicles which is conducted as part of
                                                                              this account.
                                                                                   OFFICE OF THE ASSISTANT SECRETARY OF THE ARMY (CIVIL WORKS)

                                                                              Appropriations, 2021 .............................................................................           $4,500,000
                                                                              Budget estimate, 2022 ...........................................................................             5,000,000
                                                                              Committee recommendation .................................................................                    5,000,000
                                                                                 The Committee recommends $5,000,000 for the Office of the As-
                                                                              sistant Secretary of the Army (Civil Works).
                                                                                 The Committee is concerned about the bureaucratic process for
                                                                              renewing leases under 10 U.S.C. 2667 and 16 U.S.C. 460d. The
                                                                              Committee encourages the Secretary to consider the efficiencies
                                                                              that may be gained by allowing Corps districts to authorize lease
                                                                              renewals under this section, including lease applications in excess
                                                                              of 25 years.
                                                                                 The Committee counts on a timely and accessible executive
                                                                              branch in the course of fulfilling its constitutional role in the ap-
                                                                              propriations process. The requesting and receiving of basic, factual
                                                                              information is vital to maintaining a transparent and open gov-
                                                                              erning process. The Committee recognizes that some discussions in-
                                                                              ternal to the executive branch are pre-decisional in nature and,
                                                                              therefore, not subject to disclosure. However, the access to facts,
                                                                              figures, and statistics that inform these decisions are not subject to
                                                                              the same sensitivity and are critical to the appropriations process.
                                                                              The administration needs to do more to ensure timely and complete
                                                                              responses to these inquiries.
                                                                                     WATER INFRASTRUCTURE FINANCE AND INNOVATION PROGRAM

                                                                              Appropriations, 2020 .............................................................................       $14,200,000
                                                                              Budget estimate, 2021 ........................................................................... ...........................
                                                                              Committee recommendation .................................................................                 14,200,000
                                                                                The Committee recommends $14,200,000 for the Water Infra-




amozie on DSK123TN23PROD with REPORTS
                                                                              structure Finance and Innovation Program.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021    Jkt 045272    PO 00000      Frm 00055      Fmt 6604      Sfmt 6602     U:\SR036.XXX        SR036
                                                                                                                              56

                                                                                           GENERAL PROVISIONS—CORPS OF ENGINEERS—CIVIL

                                                                                Section 101. The bill includes a provision related to reprogram-
                                                                              ming.
                                                                                Section 102. The bill includes a provision related to allocation of
                                                                              funds.
                                                                                Section 103. The bill includes a provision related to contract
                                                                              awards and modifications.
                                                                                Section 104. The bill includes a provision related to the Fish and
                                                                              Wildlife Service.
                                                                                Section 105. The bill includes a provision related to open lake
                                                                              disposal of dredged material.
                                                                                Section 106. The bill includes a provision related to the reorga-
                                                                              nization or transfer of the Corps of Engineers.
                                                                                Section 107. The bill includes a provision related to project eligi-
                                                                              bility for funding.
                                                                                Section 108. The bill includes a provision related to water re-
                                                                              allocation studies.




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00056   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                   TITLE II
                                                                                                         DEPARTMENT OF THE INTERIOR
                                                                                                 CENTRAL UTAH PROJECT COMPLETION ACCOUNT

                                                                              Appropriations, 2021 .............................................................................     $21,000,000
                                                                              Budget estimate, 2022 ...........................................................................       20,000,000
                                                                              Committee recommendation .................................................................              21,000,000
                                                                                The Committee recommends $21,000,000 for the Central Utah
                                                                              Project Completion Account, which includes $5,000,000 for the
                                                                              Utah Reclamation Mitigation and Conservation Account for use by
                                                                              the Utah Reclamation Mitigation and Conservation Commission,
                                                                              $1,550,000 for necessary expenses of the Secretary of the Interior,
                                                                              and up to $1,850,000 for the Commission’s administrative ex-
                                                                              penses. This allows the Department of the Interior to develop water
                                                                              supply facilities that will continue to sustain economic growth and
                                                                              an enhanced quality of life in the western States, the fastest grow-
                                                                              ing region in the United States. The Committee remains committed
                                                                              to complete the Central Utah Project, which would enable the
                                                                              project to initiate repayment to the Federal Government.
                                                                                                                    BUREAU OF RECLAMATION
                                                                                                              OVERVIEW OF RECOMMENDATION

                                                                                The Committee recommends $1,986,000,000 for the Bureau of
                                                                              Reclamation [Reclamation]. The Committee recommendation sets
                                                                              priorities by supporting our Nation’s water infrastructure.
                                                                                                                              INTRODUCTION

                                                                                 In addition to the traditional missions of bringing water and
                                                                              power to the West, Reclamation continues to develop programs, ini-
                                                                              tiatives, and activities that will help meet new water needs and
                                                                              balance the multitude of competing uses of water in the West. Rec-
                                                                              lamation is the largest wholesaler of water in the country, oper-
                                                                              ating 338 reservoirs with a total storage capacity of 140 million
                                                                              acre-feet. Reclamation projects deliver 10 trillion gallons of water
                                                                              to more than 31 million people each year, and provide 1 out of 5
                                                                              western farmers with irrigation water for 11 million acres of farm-
                                                                              land that produce 60 percent of the Nation’s vegetables and 25 per-
                                                                              cent of its fruits and nuts. Reclamation manages, with partners,
                                                                              289 recreation sites that have 90 million visits annually.
                                                                                                                 FISCAL YEAR 2022 WORK PLAN

                                                                                The Committee recommends funding above the budget request
                                                                              for Water and Related Resources. Reclamation is directed to submit
                                                                              a work plan, not later than 60 days after the date of enactment of
                                                                              this act, to the Committee proposing its allocation of these addi-




amozie on DSK123TN23PROD with REPORTS
                                                                                                                                        (57)




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00057      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                                         58

                                                                              tional funds. The work plan shall be consistent with the following
                                                                              general guidance:
                                                                                 —None of the funds may be used for any item for which the
                                                                                  Committee has specifically denied funding;
                                                                                 —The additional funds are recommended for studies or projects
                                                                                  that were either not included in the budget request or for
                                                                                  which the budget request was inadequate;
                                                                                 —Funding associated with a category may be allocated to eligible
                                                                                  studies or projects within that category; and
                                                                                 —Reclamation may not withhold funding from a study or project
                                                                                  because it is inconsistent with administration policy. The Com-
                                                                                  mittee notes that these funds are in excess of the administra-
                                                                                  tion’s budget request, and that administration budget metrics
                                                                                  shall not disqualify a study or project from being funded.
                                                                                                                        DROUGHT RESILIENCY

                                                                                 The Committee remains intently focused on the need for improv-
                                                                              ing drought resiliency as well as in finding opportunities for agen-
                                                                              cies to combine water supply benefits with other mission priorities.
                                                                              The impacts of the current severe drought in the west display there
                                                                              is more work to be done. The Committee continues to invest in the
                                                                              drought resiliency programs authorized in the WIIN Act and be-
                                                                              lieves a solution to these chronic droughts is a combination of addi-
                                                                              tional storage, substantial investments in desalination and recy-
                                                                              cling, improved conveyance, and increased efficiencies in the uses
                                                                              of water both for agriculture and potable purposes. As the West
                                                                              has consistently been the fastest growing part of the country, it is
                                                                              incumbent on Reclamation to lead the way in increasing the water
                                                                              that is available from year to year and to incentivize more efficient
                                                                              use of the water that is available.
                                                                                                        CONGRESSIONALLY DIRECTED SPENDING

                                                                                The Committee included congressionally directed spending, as
                                                                              defined in section 5(a) of rule XLIV of the Standing Rules of the
                                                                              Senate. The Committee funded only projects and studies that are
                                                                              authorized by law. In the interest of providing full disclosure of
                                                                              funding provided in this Title, all projects requested and funded
                                                                              are listed in a table accompanying this report. All of the projects
                                                                              funded in this report have gone through the same rigorous process
                                                                              and approvals as those proposed by the President.
                                                                                                              WATER AND RELATED RESOURCES

                                                                              Appropriations, 2021 .............................................................................   $1,521,125,000
                                                                              Budget estimate, 2022 ...........................................................................     1,379,050,000
                                                                              Committee recommendation .................................................................            1,832,101,000
                                                                                The Committee recommends $1,832,101,000 for Water and Re-
                                                                              lated Resources.
                                                                                                                              INTRODUCTION

                                                                                The Water and Related Resources account supports the develop-
                                                                              ment, management, and restoration of water and related natural
                                                                              resources in the 17 western States. The account includes funds for




amozie on DSK123TN23PROD with REPORTS
                                                                              operating and maintaining existing facilities to obtain the greatest




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00058      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                                                                   59

                                                                              overall level of benefits, to protect public safety, and to conduct
                                                                              studies on ways to improve the use of water and related natural
                                                                              resources. Work will be done in partnership and cooperation with
                                                                              non-Federal entities and other Federal agencies.
                                                                                                              BUREAU OF RECLAMATION—WATER AND RELATED RESOURCES
                                                                                                                                                     [In thousands of dollars]

                                                                                                                                                                             Budget estimate                              Committee recommendation
                                                                                                             Project title                                       Resources                    Facilities               Resources                    Facilities
                                                                                                                                                                management                     OM&R                   management                     OM&R

                                                                                                              ARIZONA
                                                                              AK CHIN INDIAN WATER RIGHTS SETTLEMENT ACT
                                                                                PROJECT ...................................................................   ........................               19,433         ........................                19,433
                                                                                  COLORADO RIVER BASIN—CENTRAL ARIZONA                                                     20,957                       648                      20,957                        648
                                                                                                        PROJECT
                                                                              COLORADO RIVER FRONT WORK AND LEVEE SYSTEM ..                                                  2,303       ........................                 2,303        ........................
                                                                              SALT RIVER PROJECT ....................................................                          649                         364                      649                          364
                                                                              SAN CARLOS APACHE TRIBE WATER SETTLEMENT ACT
                                                                                PROJECT ...................................................................                   550        ........................                   550        ........................
                                                                              YUMA AREA PROJECTS ..................................................                         1,025                     28,364                      1,025                     28,364
                                                                                                            CALIFORNIA
                                                                              CACHUMA PROJECT .......................................................                           915                    1,401                          915                     1,401
                                                                              CENTRAL VALLEY PROJECT:.
                                                                              AMERICAN RIVER DIVISION, FOLSOM DAM UNIT/MOR-
                                                                                 MON ISLAND .............................................................                  1,830                      10,937                     1,830                      10,937
                                                                              AUBURN–FOLSOM SOUTH UNIT .....................................                                  35                        2,564                       35                        2,564
                                                                              DELTA DIVISION .............................................................                17,586                      12,145                    17,586                      12,145
                                                                              EAST SIDE DIVISION ......................................................                    1,290                        2,772                    1,290                        2,772
                                                                              FRIANT DIVISION ...........................................................                  1,375                        3,761                    1,375                        3,761
                                                                              SAN JOAQUIN RIVER RESTORATION SETTLEMENT .........                                          20,500         ........................               20,500         ........................
                                                                              MISCELLANEOUS PROJECT PROGRAMS .........................                                    21,694                           370                  21,694                           370
                                                                              REPLACEMENTS, ADDITIONS, AND EXTRAORDINARY
                                                                                 MAINT PROGRAM ......................................................         ........................                29,500        ........................               29,500
                                                                              SACRAMENTO RIVER DIVISION ......................................                               7,450                       695                     12,450                       695
                                                                                   SACRAMENTO RIVER BASIN FLOOD PLAIN REAC-
                                                                                      TIVATION ..........................................................     ........................   ........................               (5,000)        ........................
                                                                              SAN FELIPE DIVISION ....................................................                          128                          68                       128                          68
                                                                              CVP SAN JOAQUIN DIVISION ..........................................             ........................   ........................   ........................   ........................
                                                                              SHASTA DIVISION ..........................................................                        494                   11,190                          494                   11,190
                                                                              TRINITY RIVER DIVISION ...............................................                       10,361                       5,230                    10,361                       5,230
                                                                              WATER AND POWER OPERATIONS .................................                                   2,251                    10,843                       2,251                    10,843
                                                                              WEST SAN JOAQUIN DIVISION, SAN LUIS UNIT .............                                         2,604                      7,075                      3,104                      7,075
                                                                                   LOS BANOS CREEK APPRAISAL STUDY ................                           ........................   ........................                  (500)       ........................
                                                                              ORLAND PROJECT ..........................................................       ........................                     923      ........................                     923
                                                                              SALTON SEA RESEARCH PROJECT ................................                                   2,000       ........................                  2,000       ........................
                                                                              SAN GABRIEL BASIN RESTORATION FUND ....................                         ........................   ........................                10,000        ........................
                                                                              SOLANO PROJECT ..........................................................                      1,162                      2,535                      1,162                      2,535
                                                                              VENTURA RIVER PROJECT .............................................                               330                          44                       830                          44
                                                                                                            COLORADO
                                                                              ANIMAS–LA PLATA PROJECT .........................................                                 758                   4,506                          758                    4,506
                                                                              ARMEL UNIT, P–SMBP ..................................................                              15                     434                           15                      434
                                                                              COLLBRAN PROJECT ......................................................                           148                   2,686                          148                    2,686
                                                                              COLORADO–BIG THOMPSON PROJECT ..........................                                          265                  15,092                          265                   15,092
                                                                              FRUITGROWERS DAM PROJECT .....................................                                     67                     133                           67                      133
                                                                              FRYINGPAN–ARKANSAS PROJECT ..................................                                      76                   8,880                           76                    8,880
                                                                              FRYINGPAN–ARKANSAS PROJECT—ARKANSAS VALLEY
                                                                                CONDUIT ...................................................................                10,050        ........................                10,050        ........................
                                                                              GRAND VALLEY UNIT, CRBSCP, TITLE II .......................                                         64                    1,755                           64                    1,755
                                                                              GRAND VALLEY PROJECT ..............................................                               193                        155                        193                        155
                                                                              LEADVILLE/ARKANSAS RIVER RECOVERY PROJECT .......                               ........................                24,878        ........................                24,878
                                                                              MANCOS PROJECT .........................................................                            93                       258                          93                       258




amozie on DSK123TN23PROD with REPORTS
                                                                              NARROWS UNIT, P–SMBP .............................................              ........................                       33     ........................                       33




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272           PO 00000             Frm 00059             Fmt 6604           Sfmt 6602            U:\SR036.XXX                  SR036
                                                                                                                                                                       60
                                                                                                   BUREAU OF RECLAMATION—WATER AND RELATED RESOURCES—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                 Budget estimate                              Committee recommendation
                                                                                                               Project title                                         Resources                    Facilities               Resources                    Facilities
                                                                                                                                                                    management                     OM&R                   management                     OM&R

                                                                              PARADOX VALLEY UNIT, CRBSCP, TITLE II ...................                                            771                      2,967                        771                      2,967
                                                                              PINE RIVER PROJECT ....................................................                              127                         361                       127                         361
                                                                              SAN LUIS VALLEY PROJECT, CLOSED BASIN .................                                              100                      2,950                        100                      2,950
                                                                              SAN LUIS VALLEY PROJECT, CONEJOS DIVISION ...........                                                 10                           20                       10                           20
                                                                              UNCOMPAHGRE PROJECT ..............................................                                   711                         169                       711                         169
                                                                              UPPER COLORADO RIVER OPERATIONS PROGRAM .......                                                    3,250       ........................                  3,250       ........................
                                                                                                                 IDAHO
                                                                              BOISE AREA PROJECTS .................................................                             2,753                       2,964                      2,753                      2,964
                                                                              COLUMBIA AND SNAKE RIVER SALMON RECOVERY
                                                                                PROJECT ...................................................................                   18,000         ........................               18,000         ........................
                                                                              LEWISTON ORCHARDS PROJECT ....................................                                     880                             27                    880                             27
                                                                              MINIDOKA AREA PROJECTS ...........................................                               2,654                        4,557                    2,654                        4,557
                                                                              PRESTON BENCH PROJECT ...........................................                                   13                             34                     13                             34
                                                                              KANSAS
                                                                              ALMENA UNIT, P–SMBP ................................................                                    18                    1,131                           18                    1,131
                                                                              BOSTWICK UNIT, P–SMBP .............................................                                   199                     1,243                         199                     1,243
                                                                              CEDAR BLUFF UNIT, P–SMBP .......................................                                        13                       452                          13                       452
                                                                              GLEN ELDER UNIT, P–SMBP .........................................                                       18                  18,519                            18                  18,519
                                                                              KANSAS RIVER UNIT, P–SMBP ......................................                    ........................                     100      ........................                     100
                                                                              KIRWIN UNIT, P–SMBP ..................................................                                  27                       387                          27                       387
                                                                              WEBSTER UNIT, P–SMBP ..............................................                                     18                    5,010                           18                    5,010
                                                                              WICHITA PROJECT—CHENEY DIVISION .........................                                               39                       398                          39                       398
                                                                              WICHITA EQUUS BEDS DIVISION ...................................                                         10     ........................                       10     ........................
                                                                                                               MONTANA
                                                                              CANYON FERRY UNIT, P–SMBP ....................................                                        188                     8,012                        188                      8,012
                                                                              EAST BENCH UNIT, P–SMBP .........................................                                     162                       602                        162                        602
                                                                              FORT PECK RESERVATION / DRY PRAIRIE RURAL
                                                                                WATER SYSTEM ........................................................                          17,191        ........................                17,191        ........................
                                                                              HELENA VALLEY UNIT, P–SMBP ....................................                                         52                       200                          52                       200
                                                                              HUNGRY HORSE PROJECT .............................................                  ........................                  1,673       ........................                  1,673
                                                                              HUNTLEY PROJECT ........................................................                                38                         24                         38                         24
                                                                              LOWER MARIAS UNIT, P–SMBP .....................................                                       536                     1,496                         536                     1,496
                                                                              LOWER YELLOWSTONE PROJECT ...................................                                         905                          22                       905                          22
                                                                              MILK RIVER PROJECT ....................................................                               400                     1,202                         400                     1,202
                                                                              MISSOURI BASIN O&M, P–SMBP ..................................                                      1,015                         157                     1,015                         157
                                                                              ROCKY BOYS/NORTH CENTRAL MT RURAL WATER SYS-
                                                                                TEM ...........................................................................               13,504         ........................               13,504         ........................
                                                                              SUN RIVER PROJECT .....................................................                            107                           373                     107                           373
                                                                              YELLOWTAIL UNIT, P–SMBP ..........................................                                 105                        9,875                      105                        9,875
                                                                                                              NEBRASKA
                                                                              AINSWORTH UNIT, P–SMBP ...........................................                                     33                        109                         33                        109
                                                                              EASTERN NEW MEXICO WATER SUPPLY—UTE RES-
                                                                                 ERVOIR .....................................................................                    7,790       ........................               25,190         ........................
                                                                              FRENCHMAN–CAMBRIDGE UNIT, P–SMBP ....................                                                174                      2,411                      174                        2,411
                                                                              MIRAGE FLATS PROJECT ...............................................                                  24                         102                      24                           102
                                                                              NORTH LOUP UNIT, P–SMBP .........................................                                     46                         198                      46                           198
                                                                                                                NEVADA
                                                                              LAHONTAN BASIN PROJECT ...........................................                                 5,435                      5,858                     5,435                       5,858
                                                                              LAKE TAHOE REGIONAL DEVELOPMENT PROGRAM .......                                                      115       ........................                   115        ........................
                                                                              LAKE MEAD/LAS VEGAS WASH PROGRAM .....................                                               595       ........................                 3,655        ........................
                                                                                                            NEW MEXICO
                                                                              CARLSBAD PROJECT ......................................................                          2,794                      6,946                      2,794                       6,946
                                                                              MIDDLE RIO GRANDE PROJECT .....................................                                 20,100                     10,530                     20,100                      10,530




amozie on DSK123TN23PROD with REPORTS
                                                                              RIO GRANDE PROJECT ..................................................                            2,391                      6,709                      2,391                       6,709




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00060             Fmt 6604            Sfmt 6602            U:\SR036.XXX                  SR036
                                                                                                                                                                   61
                                                                                                  BUREAU OF RECLAMATION—WATER AND RELATED RESOURCES—Continued
                                                                                                                                                     [In thousands of dollars]

                                                                                                                                                                             Budget estimate                              Committee recommendation
                                                                                                             Project title                                       Resources                    Facilities               Resources                    Facilities
                                                                                                                                                                management                     OM&R                   management                     OM&R

                                                                              RIO GRANDE PUEBLOS PROJECT ..................................                                  1,050       ........................                  1,050       ........................
                                                                              TUCUMCARI PROJECT ....................................................                            15                             5                      15                             5
                                                                                                         NORTH DAKOTA
                                                                              DICKINSON UNIT, P–SMBP ............................................             ........................                     838      ........................                     838
                                                                              GARRISON DIVERSION UNIT, P–SMBP Rural and Non–
                                                                                 Rural Water ..............................................................               24,568                      14,891                     24,568                     14,891
                                                                              HEART BUTTE UNIT, P–SMBP .......................................                                82                       1,271                         82                      1,271
                                                                                                            OKLAHOMA
                                                                              ARBUCKLE PROJECT ......................................................                             39                     243                            39                     243
                                                                              MCGEE CREEK PROJECT ...............................................                                 20                     904                            20                     904
                                                                              MOUNTAIN PARK PROJECT ............................................                                  30                     681                            30                     681
                                                                              NORMAN PROJECT .........................................................                            76                     289                            76                     289
                                                                              WASHITA BASIN PROJECT ..............................................                                52                   1,555                            52                   1,555
                                                                              WC AUSTIN PROJECT .....................................................                             37                     905                            37                     905
                                                                                                              OREGON
                                                                              CROOKED RIVER PROJECT ............................................                                314                        499                      314                          499
                                                                              DESCHUTES PROJECT ....................................................                            429                        231                      429                          231
                                                                              EASTERN OREGON PROJECTS .......................................                                   721                        256                      721                          256
                                                                              KLAMATH PROJECT ........................................................                     19,770                       4,299                   24,770                        4,299
                                                                                   KLAMATH, SCADA ACQUISITION ............................                    ........................   ........................               (5,000)        ........................
                                                                              ROGUE RIVER BASIN PROJECT, TALENT DIVISION ........                                               738                        543                      738                          543
                                                                              TUALATIN PROJECT ........................................................                         382                     1,856                     1,682                       1,856
                                                                                   SCOGGINS DAM ....................................................          ........................   ........................               (1,300)        ........................
                                                                              UMATILLA PROJECT .......................................................                          567                     3,100                       567                       3,100
                                                                                                         SOUTH DAKOTA
                                                                              ANGOSTURA UNIT, P–SMBP ..........................................                                   10                       882                          10                       882
                                                                              BELLE FOURCHE UNIT, P–SMBP ...................................                                    130                     1,507                         130                     1,507
                                                                              KEYHOLE UNIT, P–SMBP ...............................................                              190                        586                        190                        586
                                                                              LEWIS AND CLARK RURAL WATER SYSTEM ..................                                          9,220       ........................                31,134        ........................
                                                                              MID–DAKOTA RURAL WATER PROJECT ..........................                       ........................                       13     ........................                       13
                                                                              MNI WICONI PROJECT ...................................................          ........................                17,010        ........................                17,010
                                                                              OAHE UNIT, P–SMBP .....................................................         ........................                       90     ........................                       90
                                                                              RAPID VALLEY PROJECT ................................................           ........................                       86     ........................                       86
                                                                              RAPID VALLEY UNIT, P–SMBP .......................................               ........................                     224      ........................                     224
                                                                              SHADEHILL UNIT, P–SMBP ............................................                               119                        715                        119                        715
                                                                                                                TEXAS
                                                                              BALMORHEA PROJECT ...................................................                               4      ........................                       4      ........................
                                                                              CANADIAN RIVER PROJECT ...........................................                                 42                          82                        42                          82
                                                                              LOWER RIO GRANDE WATER CONSERVATION PROGRAM                                                       911      ........................                     911      ........................
                                                                              NUECES RIVER PROJECT ...............................................                               52                     1,010                          52                     1,010
                                                                              SAN ANGELO PROJECT ..................................................                              23                        680                         23                        680
                                                                                                                UTAH
                                                                              HYRUM PROJECT ...........................................................                       109                          260                       109                         260
                                                                              MOON LAKE PROJECT ....................................................                           19                          159                        19                         159
                                                                              NEWTON PROJECT .........................................................                         56                          132                        56                         132
                                                                              OGDEN RIVER PROJECT ................................................                            195                          246                       195                         246
                                                                              PROVO RIVER PROJECT .................................................                         3,336                          532                     3,336                         532
                                                                              SANPETE PROJECT ........................................................                         85                           18                        85                          18
                                                                              SCOFIELD PROJECT .......................................................                        344                          153                       344                         153
                                                                              STRAWBERRY VALLEY PROJECT ....................................                                  500                           60                       500                          60
                                                                              WEBER BASIN PROJECT ................................................                          1,273                          942                     1,273                         942
                                                                              WEBER RIVER PROJECT ................................................                            108                          212                       108                         212
                                                                                                           WASHINGTON




amozie on DSK123TN23PROD with REPORTS
                                                                              COLUMBIA BASIN PROJECT ...........................................                             7,270                   20,715                        7,770                   20,715




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272           PO 00000             Frm 00061             Fmt 6604           Sfmt 6602            U:\SR036.XXX                  SR036
                                                                                                                                                                       62
                                                                                                   BUREAU OF RECLAMATION—WATER AND RELATED RESOURCES—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                                                 Budget estimate                              Committee recommendation
                                                                                                               Project title                                         Resources                    Facilities               Resources                    Facilities
                                                                                                                                                                    management                     OM&R                   management                     OM&R

                                                                                   ODESSA SUBAREA ................................................                            (1,500)        ........................               (2,000)        ........................
                                                                              WASHINGTON AREA PROJECTS ......................................                                     372                          160                      372                          160
                                                                              YAKIMA PROJECT ...........................................................                        1,887                       7,040                     1,887                       7,040
                                                                              YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT                                                    25,500         ........................               26,450         ........................
                                                                                   WAPATO IRRIGATION PROJECT .............................                                    (1,040)        ........................               (1,990)        ........................
                                                                                                               WYOMING
                                                                              BOYSEN UNIT, P–SMBP ................................................                                  78                     2,235                           78                    2,235
                                                                              BUFFALO BILL DAM, DAM MODIFICATION, P–SMBP ......                                                      9                     5,941                            9                    5,941
                                                                              KENDRICK PROJECT ......................................................                               79                     3,841                           79                    3,841
                                                                              NORTH PLATTE PROJECT ...............................................                                  93                     2,487                           93                    2,487
                                                                              NORTH PLATTE AREA, P–SMBP .....................................                                      121                     6,787                          121                    6,787
                                                                              OWL CREEK UNIT, P–SMBP ..........................................                                      4                       102                            4                      102
                                                                              RIVERTON UNIT, P–SMBP .............................................                                   12                       716                           12                      716
                                                                              SHOSHONE PROJECT .....................................................                                34                     1,293                           34                    1,293

                                                                                          SUBTOTAL, ITEMS UNDER STATES ...................                                   333,604                   416,742                     399,728                    416,742

                                                                                                         REMAINING ITEMS
                                                                                      ADDITIONAL FUNDING FOR ONGOING WORK
                                                                              RURAL WATER ...............................................................         ........................   ........................               40,000         ........................
                                                                              FISH PASSAGE AND FISH SCREENS ..............................                        ........................   ........................                 8,000        ........................
                                                                                    SACRAMENTO RIVER FISH SCREEN .....................                            ........................   ........................               (3,900)        ........................
                                                                                    UPPER YAKIMA BULL TROUT RESEARCH FACILITY                                     ........................   ........................                 (700)        ........................
                                                                              WATER CONSERVATION AND DELIVERY ........................                            ........................   ........................              225,500         ........................
                                                                              ENVIRONMENTAL RESTORATION AND COMPLIANCE ......                                     ........................   ........................               20,000         ........................
                                                                              FACILITIES OPERATION, MAINTENANCE, AND REHABILI-
                                                                                 TATION ......................................................................    ........................   ........................   ........................                  2,717
                                                                              AGING INFRASTRUCTURE PROGRAM .............................                          ........................                  1,000       ........................                  1,000
                                                                              AQUATIC ECOSYSTEM RESOTRATION PROGRAM ...........                                                  1,000       ........................                  1,000       ........................
                                                                              COLORADO RIVER COMPLIANCE ACTIVITIES .................                                           21,400        ........................                21,400        ........................
                                                                              COLORADO RIVER BASIN SALINITY CONTROL PROJECT,
                                                                                 TITLE I ......................................................................   ........................                17,574        ........................                17,574
                                                                              COLORADO RIVER BASIN SALINITY CONTROL PROJECT,
                                                                                 TITLE II .....................................................................                 7,000        ........................                  7,000       ........................
                                                                              COLORADO RIVER STORAGE PROJECT (CRSP), SEC-
                                                                                 TION 5 ......................................................................                   3,164                     7,469                       3,164                      7,469
                                                                              COLORADO RIVER STORAGE PROJECT (CRSP), SEC-
                                                                                 TION 8 ......................................................................                   3,322       ........................                 3,322        ........................
                                                                              COLORADO RIVER WATER QUALITY IMPROVEMENT
                                                                                 PROJECT ...................................................................                        740      ........................                     500      ........................
                                                                                                     DAM SAFETY PROGRAM
                                                                              DEPARTMENT OF THE INTERIOR DAM SAFETY PRO-
                                                                                 GRAM ........................................................................    ........................                1,300         ........................                1,300
                                                                              INITIATE SAFETY OF DAMS CORRECTIVE ACTION .........                                 ........................              182,500         ........................              182,500
                                                                              SAFETY EVALUATION OF EXISTING DAMS ......................                           ........................               23,284         ........................               23,284
                                                                              EMERGENCY PLANNING & DISASTER RESPONSE PRO-
                                                                                 GRAM ........................................................................    ........................                 1,250                      9,950                       1,250
                                                                               ENDANGERED SPECIES RECOVERY IMPLEMENTATION
                                                                                                PROGRAM
                                                                              ENDANGERED SPECIES RECOVERY IMPLEMENTATION
                                                                                PROGRAM (Bureauwide) ...........................................                                2,575        ........................                  2,575       ........................
                                                                              ENDANGERED SPECIES RECOVERY IMPLEMENTATION
                                                                                PROGRAM (Platte River) ...........................................                               4,950       ........................                 4,950        ........................
                                                                              ENDANGERED SPEC RECOVERY IMPL PROG (Upper
                                                                                Colo & San Juan Riv Basins) ..................................                                  5,700        ........................                  5,700       ........................




amozie on DSK123TN23PROD with REPORTS
                                                                              ENVIRONMENTAL PROGRAM ADMINISTRATION ..............                                               1,711        ........................                  1,711       ........................




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00062             Fmt 6604            Sfmt 6602            U:\SR036.XXX                  SR036
                                                                                                                                                                     63
                                                                                                   BUREAU OF RECLAMATION—WATER AND RELATED RESOURCES—Continued
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                                               Budget estimate                              Committee recommendation
                                                                                                              Project title                                        Resources                    Facilities               Resources                    Facilities
                                                                                                                                                                  management                     OM&R                   management                     OM&R

                                                                              EXAMINATION OF EXISTING STRUCTURES .....................                          ........................                12,727        ........................                12,727
                                                                              GENERAL PLANNING ACTIVITIES ....................................                                 2,195       ........................                  2,195       ........................
                                                                                          INDIAN WATER RIGHTS SETTLEMENTS
                                                                              AAMODT LITIGATION SETTLEMENT .................................                                 10,000        ........................                10,000        ........................
                                                                              BLACKFEET SETTLEMENT ..............................................                            40,000        ........................                40,000        ........................
                                                                              CROW TRIBE RIGHTS ....................................................                         12,772        ........................                12,772        ........................
                                                                              NAVAJO–GALLUP ............................................................                     51,342                       5,000                    51,342                       5,000
                                                                              LAND RESOURCES MANAGEMENT PROGRAM ................                                             16,190        ........................                16,190        ........................
                                                                              LOWER COLORADO RIVER OPERATIONS PROGRAM ......                                                 45,218        ........................                45,218        ........................
                                                                              MISCELLANEOUS FLOOD CONTROL OPERATIONS ..........                                 ........................                     971      ........................                     971
                                                                              NATIVE AMERICAN AFFAIRS PROGRAM .........................                                      20,000        ........................                20,000        ........................
                                                                              NEGOTIATION & ADMINISTRATION OF WATER MAR-
                                                                                KETING ......................................................................                  2,219       ........................                 2,219        ........................
                                                                              OPERATION & PROGRAM MANAGEMENT .......................                                             836                      3,264                       836                       3,264
                                                                              POWER PROGRAM SERVICES ........................................                                  3,121                         307                    3,121                          307
                                                                              PUBLIC ACCESS AND SAFETY PROGRAM ......................                                            610                         206                      610                          206
                                                                              RECLAMATION LAW ADMINISTRATION ...........................                                       1,131       ........................                 1,131        ........................
                                                                              RECREATION & FISH & WILDLIFE PROGRAM ADMINIS-
                                                                                TRATION ....................................................................                   5,508       ........................                  5,508       ........................
                                                                                               RESEARCH AND DEVELOPMENT
                                                                              DESALINATION AND WATER PURIFICATION PROGRAM ..                                                   7,850                      1,650                    19,850                       1,650
                                                                              SCIENCE AND TECHNOLOGY PROGRAM ........................                                        18,000        ........................                18,000        ........................
                                                                              SITE SECURITY ACTIVITIES ............................................             ........................                27,500        ........................                27,500
                                                                              UNITED STATES/MEXICO BORDER ISSUES—TECHNICAL
                                                                                 SUPPORT ...................................................................                        80     ........................                       80     ........................
                                                                                                    WATERSMART PROGRAM
                                                                              WATERSMART GRANTS ..................................................                           15,000        ........................               48,000         ........................
                                                                                  WATER CONSERVATION FIELD SERVICES PRO-
                                                                                     GRAM ...............................................................                     2,318        ........................                2,318         ........................
                                                                                  COOPERATIVE WATERSHED MANAGEMENT ...........                                                2,250        ........................                2,250         ........................
                                                                                  BASIN STUDIES ....................................................                         13,500        ........................               13,500         ........................
                                                                                  DROUGHT RESPONSE & COMPREHENSIVE
                                                                                     DROUGHT PLANS .............................................                             16,500        ........................               25,000         ........................
                                                                                  TITLE XVI WATER RECLAMATION & REUSE PRO-
                                                                                     GRAM ...............................................................                     4,500        ........................                32,000        ........................

                                                                                          SUBTOTAL, REMAINING ITEMS .........................                             342,702                     286,002                    726,912                    288,719

                                                                                          TOTAL, WATER AND RELATED RESOURCES .....                                         676,306                    702,744                1,126,640                      705,461

                                                                                          GRAND TOTAL, WATER AND RELATED RE-
                                                                                            SOURCES .....................................................       ........................           1,379,050          ........................           1,832,101

                                                                                 Anadromous Fish Screen Program.—The Committee appreciates
                                                                              Reclamation’s efforts to devote additional resources to completing
                                                                              work on the last two remaining priority unscreened diversions on
                                                                              the Sacramento River, which have been specifically identified as
                                                                              priorities in the California Natural Resources Agency Sacramento
                                                                              Valley Salmon Resiliency Strategy.
                                                                                 Aging Infrastructure Program.—The majority of Reclamation’s
                                                                              infrastructure is over 50 years old, which can result in significant
                                                                              operations and maintenance costs. The Committee is interested in
                                                                              the benefit the Aging Infrastructure program could provide, par-




amozie on DSK123TN23PROD with REPORTS
                                                                              ticularly in addressing extraordinary maintenance projects, par-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00063              Fmt 6604           Sfmt 6602            U:\SR036.XXX                  SR036
                                                                                                                              64

                                                                              ticularly in drought prone areas. The Committee does not support
                                                                              allowing increases or decreases in transfer amounts at this time
                                                                              and directs Reclamation to report to the Committee prior to obliga-
                                                                              tion of any of the funds for this purpose a report detailing the im-
                                                                              plementation of this program and the criteria for evaluating eligi-
                                                                              ble projects.
                                                                                 Aquatic Ecosystem Restoration Program.—The Committee sup-
                                                                              ports the budget request of $1,000,000 for the Aquatic Ecosystem
                                                                              Restoration Program to the design, study, and construction of
                                                                              aquatic ecosystem restoration and protection projects in Reclama-
                                                                              tion States. Reclamation is directed to report to the Committee
                                                                              within 60 days after enactment of this act, detailing the plan to im-
                                                                              plement this program and the criteria for evaluating eligible
                                                                              projects.
                                                                                 Aquifer Recharge.—Reclamation is directed to work closely with
                                                                              project beneficiaries to identify and resolve any barriers to aquifer
                                                                              recharge projects when appropriate while utilizing full authority to
                                                                              prioritize funds for ongoing projects through completion. Of the
                                                                              funds recommended in this account above the budget request,
                                                                              $25,000,000 shall be for Aquifer Storage and Recovery projects fo-
                                                                              cused on ensuring sustainable water supply and protecting water
                                                                              quality of aquifers in the Great Plains Region with shared or multi-
                                                                              use aquifers for municipal, agricultural irrigation, industrial, recre-
                                                                              ation and domestic users.
                                                                                 Boulder Canyon Project, Dam Fund.—The committee is aware of
                                                                              the challenges that the Hoover Dam site cleanup maintenance
                                                                              costs place on the ratepayers. The Committee encourages Reclama-
                                                                              tion to work with the ratepayers towards a solution within applica-
                                                                              ble laws. Reclamation is directed to brief the Committee within 60
                                                                              days of enactment on the challenges, legal obstacles, and potential
                                                                              solutions related to the cleanup.
                                                                                 CALFED Water Storage Feasibility Studies.—The Committee
                                                                              strongly encourages Reclamation to expeditiously complete finan-
                                                                              cial assistance projects requested by the non-Federal sponsors of
                                                                              the CALED water storage projects to help the projects. The Com-
                                                                              mittee finds it unacceptable that these agreements have been
                                                                              under study for over 15 years.
                                                                                 Columbia Basin Project.—The Committee is aware of the Odessa
                                                                              Groundwater Replacement Program within the Columbia Basin
                                                                              Project to deliver surface water to the Odessa Subarea. The Sub-
                                                                              area groundwater is being withdrawn at a rate beyond the aquifer’s
                                                                              capacity to recharge, and aquifers in the Subarea are quickly de-
                                                                              clining. The Committee supports Reclamation’s partnership in the
                                                                              program to provide farmlands in Central and Eastern Washington
                                                                              with surface water supply through operational changes in the stor-
                                                                              age and delivery system and urges Reclamation to move forward to
                                                                              implement the program.
                                                                                 Drought Contingency Plans.—The Committee commends Rec-
                                                                              lamation, the Department of the Interior, and the seven Colorado
                                                                              River Basin states for completing drought contingency plans to con-
                                                                              serve water and reduce risks from ongoing drought for the Upper
                                                                              and Lower Colorado River basins. The completion of these plans




amozie on DSK123TN23PROD with REPORTS
                                                                              mark a major milestone in protecting a critical water source in the




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00064   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              65

                                                                              western United States. The Committee encourages Reclamation to
                                                                              provide sufficient funding for activities that support these plans.
                                                                                 Friant-Kern Canal.—The Committee encourages the Secretary to
                                                                              include funding in future budget submissions for construction ac-
                                                                              tivities related to projects found to be feasible by the Secretary and
                                                                              which are ready to initiate for the repair of critical Reclamation ca-
                                                                              nals where operational conveyance capacity has been seriously im-
                                                                              paired by factors such as age or land subsidence, especially those
                                                                              that would imminently jeopardize Reclamation’s ability to meet
                                                                              water delivery obligations.
                                                                                 Klamath Basin Project.—The Committee encourages the Bureau
                                                                              to continue to collaborate agreements with state agencies to sup-
                                                                              port groundwater monitoring efforts in the Klamath Basin.
                                                                                 Navajo-Galllup Water Supply Project.—The Committee remains
                                                                              interested in the progress on this critical project as Reclamation
                                                                              works to meet the December 2024 completion date. Reclamation is
                                                                              directed to brief the Committee within 90 days after enactment of
                                                                              this act, detailing the timeline and cost for the remaining work.
                                                                                 Research and Development: Desalination and Water Purification
                                                                              Program.—Of the funding recommended for this program,
                                                                              $12,000,000 shall be for desalination projects as authorized in sec-
                                                                              tion 4009(a) of Public Law 114–322.
                                                                                 Rural Water Projects.—Voluntary funding in excess of legally re-
                                                                              quired cost shares for rural water projects is acceptable but shall
                                                                              not be used by Reclamation as a criterion for allocating additional
                                                                              funding recommended by the Committee or for budgeting in future
                                                                              years.
                                                                                 Safety of Dams Act Cost Share.—The Committee reminds Rec-
                                                                              lamation that not more than 15 percent of dam safety modification
                                                                              project costs can be allocated for reimbursement to all project pur-
                                                                              poses and all beneficiaries consistent with Section 4 of Public Law
                                                                              95–578, as amended.
                                                                                 Salton Sea.—The Committee supports the Memorandum of Un-
                                                                              derstanding signed between the Department of the Interior and the
                                                                              California Natural Resources Agency to support management ac-
                                                                              tivities at the Salton Sea. The Committee encourages Reclamation
                                                                              to partner with Federal, state, and local agencies and coordinate
                                                                              use of all existing authorities and funding sources to support the
                                                                              State of California’s Salton Sea Management Program and reduce
                                                                              the likelihood of severe health and environmental impacts. Rec-
                                                                              lamation is directed to brief the Committee within 90 days of the
                                                                              enactment of this act on Reclamation’s plan for managing the air
                                                                              quality impacts of the estimated 8.75 square miles of lands it owns
                                                                              that will emerge from the receding Sea over the next decade.
                                                                                 San Joaquin River Restoration.—Permanent appropriations,
                                                                              available for the program in fiscal year 2020, shall not supplant
                                                                              continued annual appropriations, and the Committee encourages
                                                                              Reclamation to include adequate funding in future budget submis-
                                                                              sions.
                                                                                 Scoggins Dam, Tualatin Project, Oregon.—The Committee re-
                                                                              mains concerned about the high risk associated with Scoggins
                                                                              Dam, and urges Reclamation to work with local stakeholders and
                                                                              repayment contractors to prioritize this joint project and continue




amozie on DSK123TN23PROD with REPORTS
                                                                              to review measures to protect public safety, water security and the




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00065   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              66

                                                                              economic health of the region. Within 60 days of enactment of this
                                                                              act, Reclamation shall brief the Committee on the status of the
                                                                              dam safety activities including a timeline for completion and any
                                                                              challenges to addressing the safety concerns in the most efficient
                                                                              manner.
                                                                                 Snow Modeling Data Processing.—Better snow modeling and es-
                                                                              timates of snow water equivalent may improve water resource deci-
                                                                              sion-making, specifically for water allocations and flood control. Of
                                                                              the additional funding recommended in this account, $1,500,000
                                                                              shall be to support Reclamation’s efforts to support the U.S. De-
                                                                              partment of Agriculture and NOAA efforts to improve real-time
                                                                              and derived snow water equivalent information such that it can be
                                                                              immediately used for water resources decision-making. Reclama-
                                                                              tion is directed to brief the Committee on its plan for how Federal
                                                                              agencies will coordinate to implement emerging snowpack modeling
                                                                              technologies, required by October 1, 2021 pursuant to section
                                                                              1111(d)(1) of Subtitle FF of Public Law 116–260.
                                                                                 St. Mary’s Diversion Dam and Conveyance Works.—The Com-
                                                                              mittee recognizes the importance of stable water supply to regional
                                                                              economies and communities and and urges Reclamation to continue
                                                                              working with local stakeholders to complete its ability to pay study
                                                                              for the rehabilitation of the St. Mary’s Diversion Dam. The Com-
                                                                              mittee encourages Reclamation to find innovative methods to reha-
                                                                              bilitate the Milk River Project without significant financial impacts
                                                                              for local stakeholders.
                                                                                 Upper Rio Grande Basin Study.—The Committee recognizes the
                                                                              ecological, economic, cultural, and historic importance of the Upper
                                                                              Rio Grande Basin and the increasing stress on its water supply.
                                                                              The Committee encourages a comprehensive approach on water
                                                                              and reservoir management, operation issues, and climate resiliency
                                                                              within the Upper Rio Grande Basin (including the Heron, El Vado,
                                                                              Abiquiu, Cochiti, Jemez Canyon, Elephant Butte, and Caballo
                                                                              Dams and Reservoirs). Accordingly, Reclamation is directed to brief
                                                                              the Committee within 90 days of the enactment of this act on the
                                                                              work that has been done to date. Additionally the briefing shall
                                                                              identify additional work that can be done to supplement already
                                                                              completed work and to identify any opportunities to partner with
                                                                              the National Academies of Sciences.
                                                                                 WaterSMART Program.—The Committee encourages Reclama-
                                                                              tion to prioritize eligible water conservation projects that will pro-
                                                                              vide water supplies to meet the needs of threatened and endan-
                                                                              gered species.
                                                                                 WaterSMART Program: Open Evapotranspiration System.—The
                                                                              Committee is intrigued by the evapotranspiration in the Central
                                                                              Valley and California Delta to help measure how much water is
                                                                              consumed by crops and other plants. Reclamation is encouraged to
                                                                              utilize the Open Evapotranspiration system designed to provide
                                                                              real-time and historical evapotranspiration information, primarily
                                                                              on irrigated crop lands. Reclamation is directed to provide to the
                                                                              Committee not later than 90 days after enactment of this act a
                                                                              briefing on the potential application of this system to Reclamation
                                                                              missions.
                                                                                 WaterSMART Program: Title XVI Water Reclamation & Reuse




amozie on DSK123TN23PROD with REPORTS
                                                                              Program.—Of the funding recommended for this program,




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00066   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              67

                                                                              $20,000,000 shall be for water recycling and reuse projects as au-
                                                                              thorized in section 4009(c) of the WIIN Act.
                                                                                 Yakima River Basin Integrated Water Resource Management
                                                                              Plan.—The Committee supports the Yakima River Basin Inte-
                                                                              grated Water Resource Management Plan. This innovative water
                                                                              management plan represents years of collaboration in the Yakima
                                                                              River Basin among stakeholders including Reclamation, the State
                                                                              of Washington, the Yakama Nation, irrigators and farmers, con-
                                                                              servation organizations, recreationists, and local governments to
                                                                              address water supply needs for agriculture, fish and wildlife, and
                                                                              municipal use. The Committee encourages Reclamation to move
                                                                              forward on implementing authorized components of the plan.
                                                                                 Additional Funding for Water and Related Resources Work.—The
                                                                              Committee recommendation includes funds in addition to the budg-
                                                                              et request for Water and Related Resources studies, projects, and
                                                                              activities. Priority in allocating these funds shall be given to ad-
                                                                              vance and complete ongoing work, including preconstruction activi-
                                                                              ties, and where environmental compliance has been completed; im-
                                                                              prove water supply reliability; improve water deliveries; enhance
                                                                              national, regional, or local economic development; promote job
                                                                              growth; advance Tribal and nontribal water settlement studies and
                                                                              activities; or address critical backlog maintenance and rehabilita-
                                                                              tion activities. Reclamation is encouraged to allocate additional
                                                                              funding for aquifer recharging efforts to address the ongoing back-
                                                                              log of related projects. Reclamation is reminded that activities au-
                                                                              thorized under Indian Water Rights Settlements are eligible to
                                                                              compete for the additional funding under ‘‘Water Conservation and
                                                                              Delivery’’. Reclamation shall allocate additional funding provided in
                                                                              this account consistent with the following direction:
                                                                                 —Of the additional funding recommended under the heading
                                                                                   ‘‘Water Conservation and Delivery’’, $134,000,000 shall be for
                                                                                   water storage projects as authorized in section 4007 of the
                                                                                   WIIN Act;
                                                                                 —Of the additional funding recommended under the heading
                                                                                   ‘‘Water Conservation and Delivery,’’ $40,000,000 shall be for
                                                                                   implementing the Drought Contingency Plan in the Lower Col-
                                                                                   orado River Basin to create or conserve recurring Colorado
                                                                                   River water that contributes to supplies in Lake Mead and
                                                                                   other Colorado River water reservoirs in the Lower Colorado
                                                                                   Basin or projects to improve the long-term efficiency of oper-
                                                                                   ations in the Lower Colorado River Basin, consistent with the
                                                                                   Secretary’s obligations under the Colorado River Drought Con-
                                                                                   tingency Plan Authorization Act of 2019 (Public Law 116–14)
                                                                                   and related agreements. These water conservation activities
                                                                                   may include well construction and irrigation-related structural
                                                                                   or other measures; programs and projects that result in con-
                                                                                   servation of surface water or groundwater; or improve water
                                                                                   system efficiency, resiliency, reliability, delivery, and convey-
                                                                                   ance, including canal system improvements. None of these
                                                                                   funds shall be used for the operation of the Yuma Desalting
                                                                                   Plant and nothing in this section shall be construed as limiting
                                                                                   existing or future opportunities to augment the water supplies




amozie on DSK123TN23PROD with REPORTS
                                                                                   of the Colorado River




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00067   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                         68

                                                                                   —Of the additional funding recommended under the heading
                                                                                    ‘‘Water Conservation and Delivery,’’ not less than $10,000,000,
                                                                                    shall be for construction activities related to projects found to
                                                                                    be feasible by the Secretary and which are ready to initiate for
                                                                                    the repair of critical Reclamation canals where operational con-
                                                                                    veyance capacity has been seriously impaired by factors such
                                                                                    as age or land subsidence, especially those that would immi-
                                                                                    nently jeopardize Reclamation’s ability to meet water delivery
                                                                                    obligations;
                                                                                   —Of the additional funding recommended under the heading
                                                                                    ‘‘Environmental Restoration or Compliance’’, not less than
                                                                                    $20,000,000 shall be for activities authorized under sections
                                                                                    4001 and 4010 of the WIIN Act or as set forth in Federal-State
                                                                                    plans for restoring threatened and endangered fish species af-
                                                                                    fected by the operation of Reclamation’s water projects.
                                                                                                  CENTRAL VALLEY PROJECT RESTORATION FUND

                                                                                                                       GROSS APPROPRIATION

                                                                              Appropriations, 2021 .............................................................................     $55,875,000
                                                                              Budget estimate, 2022 ...........................................................................       56,499,000
                                                                              Committee recommendation .................................................................              56,499,000
                                                                                 The Committee recommends $56,499,000 for the Central Valley
                                                                              Project Restoration Fund, the same as the budget request. This ap-
                                                                              propriation is fully offset by collections, resulting in a net appro-
                                                                              priation of $0.
                                                                                 The Central Valley Project Restoration Fund was authorized in
                                                                              the Central Valley Project Improvement Act, title 34 of Public Law
                                                                              102–575. This fund uses revenues from payments by project bene-
                                                                              ficiaries and donations for habitat restoration, improvement and
                                                                              acquisition, and other fish and wildlife restoration activities in the
                                                                              Central Valley project area of California. Payments from project
                                                                              beneficiaries include several required by the act (Friant Division
                                                                              surcharges, higher charges on water transferred to non-Central
                                                                              Valley Project users, and tiered water prices) and, to the extent re-
                                                                              quired in appropriations acts, additional annual mitigation and res-
                                                                              toration payments.
                                                                                                          CALIFORNIA BAY-DELTA RESTORATION

                                                                              Appropriations, 2021 .............................................................................     $33,000,000
                                                                              Budget estimate, 2022 ...........................................................................       33,000,000
                                                                              Committee recommendation .................................................................              33,000,000
                                                                                 The Committee recommends $33,000,000 for California Bay-
                                                                              Delta Restoration, the same as the budget request.
                                                                                 This account funds activities that are consistent with the
                                                                              CALFED Bay-Delta Program, a collaborative effort involving 18
                                                                              State and Federal agencies and representatives of California’s
                                                                              urban, agricultural, and environmental communities. The goals of
                                                                              the program are to improve fish and wildlife habitat, water supply
                                                                              reliability, and water quality in the San Francisco Bay-San Joa-
                                                                              quin River Delta, the principle hub of California’s water distribu-




amozie on DSK123TN23PROD with REPORTS
                                                                              tion system.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00068      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                                         69

                                                                                                                 POLICY AND ADMINISTRATION

                                                                              Appropriations, 2021 .............................................................................     $60,000,000
                                                                              Budget estimate, 2022 ...........................................................................       64,400,000
                                                                              Committee recommendation .................................................................              64,400,000
                                                                                 The Committee recommends $64,400,000 for Policy and Adminis-
                                                                              tration, the same as the budget request.
                                                                                 This account funds the executive direction and management of
                                                                              all Reclamation activities, as performed by the Commissioner’s of-
                                                                              fices in Washington, DC; Denver, Colorado; and five regional of-
                                                                              fices. The Denver office and regional offices charge individual
                                                                              projects or activities for direct beneficial services and related ad-
                                                                              ministrative and technical costs. These charges are covered under
                                                                              other appropriations.
                                                                                   GENERAL PROVISIONS—DEPARTMENT OF THE INTERIOR
                                                                                 Section 201. The bill includes a provision regarding reprogram-
                                                                              ming.
                                                                                 Section 202. The bill includes a provision regarding the San Luis
                                                                              Unit and Kesterson Reservoir.
                                                                                 Section 203. The bill includes a provision regarding the Secure
                                                                              Water Act.
                                                                                 Section 204. The bill includes a provision regarding CALFED
                                                                              Bay-Delta.
                                                                                 Section 205. The bill includes a provision regarding the Omnibus
                                                                              Public Land Management Act of 2009.
                                                                                 Section 206. The bill includes a provision regarding the Reclama-
                                                                              tion States Emergency Drought Relief Act of 1991.
                                                                                 Section 207. The bill includes a provision regarding the Coopera-
                                                                              tive Watershed Management Act.




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00069      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                         TITLE III
                                                                                                            DEPARTMENT OF ENERGY
                                                                                                           OVERVIEW OF RECOMMENDATION
                                                                                 The Committee recommendation sets priorities by supporting the
                                                                              Office of Science and the Advanced Research Projects Agency-En-
                                                                              ergy [ARPA–E], leading the world in scientific computing, address-
                                                                              ing the Federal Government’s responsibility for environmental
                                                                              cleanup and disposal of used nuclear fuel, keeping large construc-
                                                                              tion projects on time and on budget, effectively maintaining our nu-
                                                                              clear weapons stockpile, and supporting our nuclear Navy.
                                                                                                                       INTRODUCTION
                                                                                The mission of the Department of Energy [Department] is to en-
                                                                              sure America’s security and prosperity by addressing its energy,
                                                                              environmental, and nuclear challenges through transformative
                                                                              science and technology solutions. To accomplish this mission, the
                                                                              Secretary of Energy [Secretary] relies on a world-class network of
                                                                              national laboratories, private industry, universities, States, and
                                                                              Federal agencies, which allows our brightest minds to solve our
                                                                              Nation’s most important challenges.
                                                                                The Committee’s recommendation for the Department includes
                                                                              funding in both defense and non-defense budget categories. Defense
                                                                              funding is recommended for atomic energy defense activities, in-
                                                                              cluding the National Nuclear Security Administration [NNSA],
                                                                              which manages our Nation’s stockpile of nuclear weapons, prevents
                                                                              proliferation of dangerous nuclear materials, and supports the
                                                                              Navy’s nuclear fleet; defense environmental cleanup to remediate
                                                                              the former nuclear weapons complex; and safeguards and security
                                                                              for Idaho National Laboratory. Non-defense funding is rec-
                                                                              ommended for the Department’s energy research and development
                                                                              programs (including nuclear, fossil, renewable energy, energy effi-
                                                                              ciency, grid modernization and resiliency, and the Office of
                                                                              Science), power marketing administrations, the Federal Energy
                                                                              Regulatory Commission, and administrative expenses.
                                                                                                            REPROGRAMMING GUIDELINES
                                                                                The Committee’s recommendation includes control points to en-
                                                                              sure the Secretary spends taxpayer funds in accordance with con-
                                                                              gressional direction. The Committee’s recommendation also in-
                                                                              cludes reprogramming guidelines to allow the Secretary to request
                                                                              permission from the Committee for certain expenditures, as defined
                                                                              below, which would not otherwise be permissible. The Secretary’s
                                                                              execution of appropriated funds shall be fully consistent with the
                                                                              direction provided under this heading and in section 301 of the bill,




amozie on DSK123TN23PROD with REPORTS
                                                                                                                              (70)




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00070   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                              71

                                                                              unless the Committee includes separate guidelines for specific ac-
                                                                              tions in the bill or report.
                                                                                 Prior to obligating any funds for an action defined below as a re-
                                                                              programming, the Secretary shall notify and obtain approval of the
                                                                              Committees on Appropriations of both Houses of Congress. The
                                                                              Secretary shall submit a detailed reprogramming request in accord-
                                                                              ance with section 301 of the bill, which shall, at a minimum, justify
                                                                              the deviation from prior congressional direction and describe the
                                                                              proposed funding adjustments with specificity. The Secretary shall
                                                                              not, pending approval from the Committee, obligate any funds for
                                                                              the action described in the reprogramming proposal.
                                                                                 The Secretary is also directed to inform the Committees on Ap-
                                                                              propriations of both Houses of Congress promptly and fully when
                                                                              a change in program execution and funding is required during the
                                                                              fiscal year.
                                                                                 Definition.—A reprogramming includes:
                                                                                 —the reallocation of funds from one activity to another within an
                                                                                   appropriation;
                                                                                 —any significant departure from a program, project, activity, or
                                                                                   organization described in the agency’s budget justification as
                                                                                   presented to and approved by Congress;
                                                                                 —for construction projects, the reallocation of funds from one
                                                                                   construction project identified in the agency’s budget justifica-
                                                                                   tion to another project or a significant change in the scope of
                                                                                   an approved project;
                                                                                 —adoption of any reorganization proposal which includes moving
                                                                                   prior appropriations between appropriations accounts; and
                                                                                 —any reallocation of new or prior year budget authority, or prior
                                                                                   year deobligations.
                                                                                                                SEXUAL HARRASSMENT
                                                                                 The Government Accountability Office [GAO] recently released a
                                                                              report on sexual harassment in NNSA’s nuclear security forces.
                                                                              The Committee is encouraged that the Department and NNSA
                                                                              stated they welcome opportunities for continuous improvement,
                                                                              and that they agreed with the five recommendations in the report.
                                                                              The Committee also commends NNSA for broadening its focus to
                                                                              implementing the recommendations beyond the nuclear security
                                                                              forces to include all Federal employees and contractors across the
                                                                              NNSA enterprise. To better understand and document the Depart-
                                                                              ment and NNSA progress in implementing these recommendations,
                                                                              the Committee requests that the Department and NNSA brief the
                                                                              Armed Services and Appropriations Committees of both the House
                                                                              and Senate on the steps taken, progress made, and relevant find-
                                                                              ings in their efforts to implement the recommendations in the re-
                                                                              port. These briefings shall take place within 6 months of enactment
                                                                              of the act and every 6 months thereafter until GAO’s recommenda-
                                                                              tions are implemented.
                                                                                                           COVID–19 RESEARCH DELAYS
                                                                                The Committee recognizes the potential impacts and delays in re-
                                                                              search caused by the effects of the COVID–19 pandemic. The Com-




amozie on DSK123TN23PROD with REPORTS
                                                                              mittee notes that the Department has taken some steps to engage




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00071   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                              72

                                                                              scientific professional societies, universities and colleges, and other
                                                                              Federal agencies to obtain up to-date information on the impacts
                                                                              to institutions and research communities to help inform an open,
                                                                              transparent, and equitable response. However, the Committee is
                                                                              concerned that this response has been uneven across the Depart-
                                                                              ment. The Department is encouraged to consider these impacts
                                                                              within the resources available. The Department is directed to pro-
                                                                              vide to the Committee not later than 60 days after enactment of
                                                                              this act a report that details the impacts of the COVID–19 pan-
                                                                              demic on institutions and research communities. The report shall
                                                                              outline funding and costs associated with the impacts. Further, the
                                                                              Department is encouraged to include funding to address the im-
                                                                              pacts in future budget requests.
                                                                                                             CROSSCUTTING INITIATIVES
                                                                                 Grid Modernization.—The Department is directed to continue the
                                                                              ongoing work among the national laboratories, industry, and uni-
                                                                              versities to improve grid reliability and resiliency through the stra-
                                                                              tegic goals of the Grid Modernization Initiative [GMI]. The Com-
                                                                              mittee recognizes the accomplishments of over 200 partners from
                                                                              industry, academia, and state governments in these efforts. The
                                                                              Department shall brief the Committee not later than 90 days after
                                                                              enactment of this act on the revised GMI strategy, plans to reflect
                                                                              new decarbonization targets in strategy enhancements, the funding
                                                                              profiles, portfolio of funding opportunities, programmatic invest-
                                                                              ments for the Initiative, and the roles and responsibilities of each
                                                                              participating program office. The Committee supports the Grid
                                                                              Modernization Laboratory Consortium [GMLC] and continued im-
                                                                              plementation of the Grid Multi-Year Program Plan [MYPP] to en-
                                                                              sure coordination across all applied program offices, including the
                                                                              additions of the Offices of Cybersecurity, Energy Security, and
                                                                              Emergency Response [CESER]; Nuclear Energy [NE]; and Fossil
                                                                              Energy and Carbon Management [FECM] to the MYPP. The Com-
                                                                              mittee directs the Department to continue its emphasis on national
                                                                              energy systems resilience within the context of administration
                                                                              goals in decarbonization of the power system and related infra-
                                                                              structures, such as transportation. This shall build on GMI/GMLC
                                                                              progress in advanced grid modeling and improved grid cyber resil-
                                                                              ience to address emerging national resilience challenges of the grid
                                                                              and related energy systems, planned investments in energy storage
                                                                              to improve grid flexibility and resilience, and advanced sensors and
                                                                              control paradigms that promise to improve energy system resilience
                                                                              of the grid of the future. The Committee recognizes the growing im-
                                                                              portance of training and workforce development to support grid
                                                                              modernization research and development, and the Committee di-
                                                                              rects the Department to develop a plan for a pipeline of students,
                                                                              graduates, and professors to sustain a robust grid modernization
                                                                              research, design, and operations capability over the long-term.
                                                                                 Carbon Dioxide Removal.—The fiscal year 2020 Act directed the
                                                                              Department to develop an implementation plan coordinated across
                                                                              FECM, Energy Efficiency and Renewable Energy [EERE], and the
                                                                              Office of Science. The Committee is still awaiting this plan and di-
                                                                              rects the Department to provide the plan immediately after enact-




amozie on DSK123TN23PROD with REPORTS
                                                                              ment of this act. The Department is directed to include a break-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00072   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                              73

                                                                              down of the roles and responsibilities of each participating program
                                                                              office in the implementation plan. The Department is directed, pur-
                                                                              suant to section 5001 and 5002 of the Energy Act of 2020, to estab-
                                                                              lish the Carbon Dioxide Removal Program and Carbon Dioxide Re-
                                                                              moval Task Force to advance the development and commercializa-
                                                                              tion of carbon dioxide removal, direct air capture, sequestration,
                                                                              and any other relevant technologies on a significant scale. The De-
                                                                              partment is directed to coordinate these activities among FECM,
                                                                              EERE, and the Office of Science. The Committee supports direct
                                                                              air capture prize competitions. The Department is directed to pro-
                                                                              vide to the Committee not later than 30 days after enactment of
                                                                              this act the report required by section 5002 of the Energy Act of
                                                                              2020.
                                                                                 The recommendation provides not less than $120,000,000 for re-
                                                                              search, development, and demonstration of carbon dioxide removal
                                                                              technologies, including not less than $20,000,000 from EERE, not
                                                                              less than $50,000,000 from FECM, and not less than $35,000,000
                                                                              from the Office of Science. Within available funds for carbon diox-
                                                                              ide removal, the recommendation provides not less than
                                                                              $75,000,000 for direct air capture.
                                                                                 Equity and Justice.—The Committee supports the Department’s
                                                                              continuing efforts and progress in implementing the Justice40 Ini-
                                                                              tiative, Executive Order 13985, and Executive Order 14008. The
                                                                              Committee supports the Department’s reforms toward addressing
                                                                              equity and justice issues within the U.S. energy system. In order
                                                                              to accelerate these reforms at the Department, the Committee di-
                                                                              rects the Department to survey its current programs, grant-mak-
                                                                              ing, policies, procedures, and rules to ensure that it is adequately
                                                                              meeting the clean energy, energy conservation, and energy effi-
                                                                              ciency needs of low-income, minority, and other marginalized com-
                                                                              munities. Further, the Department is encouraged to engage with
                                                                              communities impacted by climate change, air and water pollution,
                                                                              systemic racism and underinvestment, high energy costs, and eco-
                                                                              nomic inequality when conducting this survey. The Department is
                                                                              directed to provide to the Committee not later than 180 days after
                                                                              enactment of this act a report summarizing its efforts, including
                                                                              key findings, and a strategy to carry out the direction contained
                                                                              herein.
                                                                                 Critical Minerals.—The Committee supports the Department’s
                                                                              coordination of critical minerals activities across the Department
                                                                              through the Critical Minerals Initiative. The recommendation pro-
                                                                              vides not less than $146,000,000 for research, development, dem-
                                                                              onstration, and commercialization activities on the development of
                                                                              alternatives to, recycling of, and efficient production and use of
                                                                              critical minerals, including not less than $100,000,000 from EERE,
                                                                              not less than $25,000,000 from FECM, and not less than
                                                                              $17,000,000 from the Office of Science. The Department is encour-
                                                                              aged to carry out these activities pursuant to sections 7001 and
                                                                              7002 of the Energy Act of 2020.
                                                                                 Industrial Decarbonization.—Nearly 30 percent of greenhouse
                                                                              gas emissions come from hard-to-reduce industrial sources, includ-
                                                                              ing heavy road and rail transport, shipping, aviation, chemical pro-
                                                                              duction, steel and cement production, and heat production. To




amozie on DSK123TN23PROD with REPORTS
                                                                              make progress on climate change, it is necessary to reduce emis-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00073   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                              74

                                                                              sions in this sector. The Committee supports the Department’s ef-
                                                                              forts, aligned with Title VI of the Energy Act of 2020, to foster in-
                                                                              novations and enable scale up of cost-competitive, low-emissions
                                                                              technologies. Further, the Committee encourages the Department
                                                                              to establish an Office of Industrial Emissions Reduction Technology
                                                                              Development Program as required by the Energy Act of 2020 to
                                                                              support coordinating research, developing and demonstrating tech-
                                                                              nologies, and providing commercial applications of technologies
                                                                              that achieve significant emissions reductions in the industrial sec-
                                                                              tors.
                                                                                 The recommendation provides not less than $520,000,000 for in-
                                                                              dustrial decarbonization activities, including not less than
                                                                              $250,000,000 from EERE, not less than $250,000,000 from FECM,
                                                                              and not less than $20,000,000 from the Office of Science. The funds
                                                                              provided are for research, development, and demonstration of tech-
                                                                              nologies to strengthen the competitiveness of America’s industrial
                                                                              sector, including low-carbon feedstocks, clean heat alternatives, in-
                                                                              dustrial carbon capture and removal, and electrification. Not less
                                                                              than $25,000,000 is provided for low-carbon feedstocks in the steel,
                                                                              cement, concrete, and other heavy industrial sectors. In addition,
                                                                              not less than $25,000,000 is provided for clean heat alternatives for
                                                                              industrial processes.
                                                                                 Further, the Committee supports the continuation of the Depart-
                                                                              ment’s existing Cooperative Agreements to develop cost sharing
                                                                              partnerships to conduct basic, fundamental, and applied research
                                                                              that assist industry in developing, deploying, and commercializing
                                                                              efficient, low-carbon, nonpolluting energy technologies that could
                                                                              compete effectively in meeting requirements for clean fuels, chem-
                                                                              ical feedstocks, electricity, and water resources.
                                                                                 Energy Storage.—The Committee supports the Department’s on-
                                                                              going efforts for the Energy Storage Grand Challenge [ESGC] ini-
                                                                              tiative, as well as cost-shared demonstrations of energy storage
                                                                              technologies. The ESGC builds on the Department’s prior research
                                                                              and development efforts in storage and will align Energy Storage
                                                                              research and development efforts to focus on technical, regulatory,
                                                                              and market issues necessary to achieve the technology goals. The
                                                                              Department is directed to continue to provide the Committee peri-
                                                                              odic updates on the ESGC and make publically available a cross-
                                                                              cutting research and development road-map through 2030 to illus-
                                                                              trate the ESGC’s goals. This road-map shall be focused on reducing
                                                                              costs and improving the performance of a diverse set of grid-scale
                                                                              storage technologies to meet industry needs, improve reliability
                                                                              and environmental performance of the electricity grid, and reduce
                                                                              greenhouse gas emissions.
                                                                                 The Committee recognizes that energy storage will play a vital
                                                                              role in integrating new energy sources while strengthening grid re-
                                                                              liability and resilience. Energy storage systems are fuel neutral
                                                                              and help generation connected to the grid become more efficient,
                                                                              productive, and competitive. The Department is directed to carry
                                                                              out these activities in accordance with sections 3201 and 3202 of
                                                                              the Energy Act of 2020. The Department is directed to support
                                                                              long-duration joint demonstration projects with the Department of
                                                                              Defense and grants for rural utilities to build microgrids for resil-




amozie on DSK123TN23PROD with REPORTS
                                                                              iency. The Department is directed to support competitive pilot dem-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00074   Fmt 6604   Sfmt 6604   U:\SR036.XXX   SR036
                                                                                                                                         75

                                                                              onstration grants, as authorized in section 3201 of the Energy Act
                                                                              of 2020, for energy storage projects that are wholly U.S.-made,
                                                                              sourced, and supplied.
                                                                                 The recommendation provides not less than $460,000,000 for en-
                                                                              ergy storage, including not less than $347,000,000 from EERE, not
                                                                              less than $80,000,000 from OE, not less than $5,000,000 from
                                                                              FECM, not less than $4,000,000 from NE, and not less than
                                                                              $24,000,000 from the Office of Science.
                                                                                 Arctic Energy Office.—The Committee supports the promotion of
                                                                              research, development, and deployment of electric power technology
                                                                              that is cost-effective and well-suited to meet the needs of rural and
                                                                              remote regions of the United States, especially where permafrost is
                                                                              present or located nearby. The Committee encourages the Arctic
                                                                              Energy Office [AEO] to continue to bring together assets from
                                                                              across the Department to work together in collaborative and inno-
                                                                              vative ways to meet the energy, science, and national security
                                                                              needs of the United States and its allies in the Arctic. Further, the
                                                                              AEO is encouraged to lead cross-cutting operations in the Arctic
                                                                              with a mission to tackle the energy, science, and national security
                                                                              challenges of the 21st Century. Alaska is home to some of the high-
                                                                              est energy costs in the nation, making diverse research, develop-
                                                                              ment, and deployment opportunities more cost-effective to meet the
                                                                              needs of rural and remote regions of the United States. There are
                                                                              also a wide variety of energy resources and technologies, both tra-
                                                                              ditional and innovative, available in Alaska, including more than
                                                                              200 microgrids.
                                                                                 Hydrogen Energy and Fuel Cell Coordination.—The Committee
                                                                              directs that the Department coordinates its efforts in hydrogen en-
                                                                              ergy and fuel cell technologies across its various departments and
                                                                              offices in order to maximize the effectiveness of investments in hy-
                                                                              drogen-related activities. This coordination shall include EERE,
                                                                              FECM, NE, OE, the Office of Science, and ARPA–E.
                                                                                 Unmanned Aircraft.—The Committee encourages the Depart-
                                                                              ment to test the effectiveness of Counter-Unmanned Aircraft Sys-
                                                                              tems technologies to protect critical Departmental assets.
                                                                                                                      ENERGY PROGRAMS
                                                                                                 ENERGY EFFICIENCY AND RENEWABLE ENERGY
                                                                              Appropriations, 2021 .............................................................................   $2,861,760,000
                                                                              Budget estimate, 2022 ...........................................................................     4,732,000,000
                                                                              Committee recommendation .................................................................            3,896,971,000
                                                                                 The Committee recommends $3,896,971,000 for Energy Efficiency
                                                                              and Renewable Energy. Within available funds, the Committee rec-
                                                                              ommends $220,000,000 for program direction.
                                                                                 The Department is directed throughout all of its programs to
                                                                              maintain a balanced portfolio of early-, mid-, and late-stage re-
                                                                              search, development, demonstration, deployment and other market
                                                                              transformation activities that will deliver innovative energy tech-
                                                                              nologies, practices, and information to American consumers and in-
                                                                              dustry. While Federal investment plays a greater role in early
                                                                              stage research, the portfolio must be balanced by being inclusive of
                                                                              Federal investment in mid-to-late research activities, including




amozie on DSK123TN23PROD with REPORTS
                                                                              field evaluation of early-stage technology to provide testing and




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00075      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                              76

                                                                              data collection in a real-world setting. This includes demonstration,
                                                                              deployment, and other market transformation activities, including
                                                                              delineation by account and subaccounts to attract private sector
                                                                              cost-share that will advance technology to market and provide a
                                                                              bridge to small businesses, cities, or small utilities with fewer re-
                                                                              sources and tools to participate in energy infrastructure planning.
                                                                              The Department is further directed to fully execute the funds ap-
                                                                              propriated in a timely manner and to keep the Committees on Ap-
                                                                              propriations of both Houses of Congress apprised of progress in im-
                                                                              plementing funded programs, projects, and activities.
                                                                                 Within available funds, the Committee recommends $3,000,000
                                                                              for the Energy Transitions Initiative [ETI] to address high energy
                                                                              costs, reliability, and inadequate infrastructure challenges faced by
                                                                              island and remote communities. The Committee supports ETI’s ef-
                                                                              forts to develop a cross-sector initiative alongside community-based
                                                                              organizations pursuing energy transition efforts that will address
                                                                              energy challenges, build capacity, accelerate the sharing of best
                                                                              practices and innovations between similarly-situated regions, and
                                                                              leverage specialized, local expertise into commercial opportunity.
                                                                              The Committee directs the Department to continue to support com-
                                                                              munity-based initiatives by partnering with community-based orga-
                                                                              nizations, and leverage the Department’s previously-developed tool
                                                                              to build cost effective, resilient energy infrastructure on island and
                                                                              remote communities, including in Alaska, Hawaii, New England,
                                                                              the Caribbean, and elsewhere.
                                                                                 Workforce Development.—The Committee believes there are sig-
                                                                              nificant clean energy challenges related to the inclusion of students
                                                                              from underserved institutions in the technology development pro-
                                                                              grams within the Department’s portfolio of manufacturing, solar,
                                                                              transportation and grid/energy storage. Clean energy programs can
                                                                              provide a much more inclusive talent pipeline. Accordingly, the
                                                                              Committee recommends $5,000,000 to support an expansion of
                                                                              these efforts through a university which has existing partnerships
                                                                              with several Historically Black Colleges and Universities and Mi-
                                                                              nority Serving Institutions, and participants in several Depart-
                                                                              mental applied energy research programs.
                                                                                 Further, the development of a skilled workforce is critical to the
                                                                              successful transition to a clean energy economy and deployment
                                                                              and long-term sustainability of energy efficient and renewable en-
                                                                              ergy technologies. The Committee encourages EERE to support
                                                                              training and workforce development programs that assist and sup-
                                                                              port workers in trades and activities required for the continued
                                                                              growth of the U.S. energy efficiency and clean energy sectors, with
                                                                              an emphasis on training programs focused on building retrofit and
                                                                              construction industries. Furthermore, the Committee encourages
                                                                              the Department to continue to work with two-year, public commu-
                                                                              nity, technical colleges, and non-governmental and industry con-
                                                                              sortia for job training programs, including programs focused on dis-
                                                                              placed fossil fuel workers, that lead to an industry-recognized cre-
                                                                              dential in the energy workforce.
                                                                                 Renewable Energy Grid Integration.—To facilitate the oversight
                                                                              of grid integration activities among renewable energy technologies,
                                                                              the Committee recommends $40,000,000 to be provided from across




amozie on DSK123TN23PROD with REPORTS
                                                                              the Solar Energy, Wind Energy, Water Power, and Geothermal




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00076   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              77

                                                                              Technologies programs. Further, within available funds, the Com-
                                                                              mittee recommends $10,000,000 for development and demonstra-
                                                                              tion of an ‘‘energyshed’’ management system that addresses a dis-
                                                                              crete geographic area in which renewable sources currently provide
                                                                              a large portion of electric energy needs, where grid capacity con-
                                                                              straints result in curtailment of renewable generation, and with
                                                                              interactive smart meters. The ‘‘energyshed’’ design should achieve
                                                                              a high level of integration, resilience and reliability among all en-
                                                                              ergy uses, including both on-demand and long-time energy scales,
                                                                              transmission and distribution of electricity.
                                                                                 Polyethylene Plastics.—The Committee recommends up to
                                                                              $5,000,000 for university-led research in order to increase recycling
                                                                              rates for polyethylene plastics and develop conversion of waste pol-
                                                                              yethylene to more recyclable and biodegradable plastics.
                                                                                 The Department is directed to provide to the Committee not later
                                                                              than 30 days after enactment of this act a briefing on the status
                                                                              of its decarbonization roadmaps in key technology areas to guide
                                                                              research and development at the Department to achieve signifi-
                                                                              cant, economical greenhouse gas emission reductions by 2050, in-
                                                                              cluding energy efficiency, process electrification, industrial elec-
                                                                              trification technologies, and carbon capture.
                                                                                 North American Energy Research.—Within available funds, the
                                                                              Committee recommends $10,000,000 for a consortium of univer-
                                                                              sities in the United States that has established agreements with
                                                                              universities in Canada and Mexico to conduct research on a broad
                                                                              array of energy sources and topics.
                                                                                 The Department is encouraged to solicit proposals to study the
                                                                              value potentially derived from construction of a large-scale pumped
                                                                              storage project of at least 750 MW capacity for grid stability, reli-
                                                                              ability, and resiliency of the bulk electric system, and for the inte-
                                                                              gration of intermittent generation resources. Such a study is en-
                                                                              couraged to include consideration of impacts on the markets and
                                                                              transmission grids operated by at least one Regional Transmission
                                                                              Organization or Independent System Operator within which the
                                                                              proposed project would be located.
                                                                                                           SUSTAINABLE TRANSPORTATION
                                                                                Within available funds, the Committee recommends not less than
                                                                              $40,000,000 to continue the SuperTruck III program to further im-
                                                                              prove the energy and freight efficiency of heavy and medium duty
                                                                              long- and regional-haul vehicles.
                                                                                Vehicle Technologies.—The Committee recommends $553,114,000
                                                                              for Vehicle Technologies. The Committee encourages the Depart-
                                                                              ment to prioritize projects in States where the transportation sector
                                                                              is responsible for a higher percentage of the State’s total energy
                                                                              consumption and is the largest source of greenhouse gases.
                                                                                Battery and Electrification Technologies.—The Committee rec-
                                                                              ommends $248,000,000 for Battery and Electrification Tech-
                                                                              nologies. The Committee recognizes the increasing domestic manu-
                                                                              facturing opportunities for electric battery production for vehicles.
                                                                              The Committee also encourages the Department to work to expand
                                                                              domestic manufacturing opportunities for electric vehicle batteries




amozie on DSK123TN23PROD with REPORTS
                                                                              and to further address consumer barriers to adoption.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00077   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              78

                                                                                 Within available funding, the Committee recommends not less
                                                                              than $40,000,000 is provided for Electric Drive Research and not
                                                                              less than $20,000,000 for the ReCell initiative to improve strategies
                                                                              to recycle and repurpose batteries, including for use on the elec-
                                                                              trical grid. The Committee also supports efforts to improve cost,
                                                                              performance and charging time of plug-in electric vehicles, as well
                                                                              as further research into reducing the size of vehicle batteries and
                                                                              reducing cobalt content. Within available funds, the Committee rec-
                                                                              ommends not less than $25,000,000 for the Vehicle Technologies
                                                                              Office to expand its partnership with the Advanced Manufacturing
                                                                              Office on efforts to scale up the domestic battery supply chain, in-
                                                                              cluding battery manufacturing demonstration projects.
                                                                                 The Committee directs the Department to continue to support
                                                                              the Clean Cities alternative fuels deployment program focused on
                                                                              vehicles that can deliver lower greenhouse gas emissions and meet
                                                                              customer needs, which can include vehicles powered by biofuels,
                                                                              electricity, hydrogen, natural gas, renewable natural gas, and pro-
                                                                              pane. Within available funds, the recommendation provides not
                                                                              less than $60,000,000 for deployment through the Clean Cities pro-
                                                                              gram, including not less than $40,000,000 for competitive grants,
                                                                              to support alternative fuel, infrastructure, new mobility, and vehi-
                                                                              cle deployment activities. When issuing competitive grants in sup-
                                                                              port of these activities, the Department is encouraged to include
                                                                              some awards that range from $500,000 to $1,000,000 each and en-
                                                                              courage at least one Clean Cities coalition partner. The Committee
                                                                              encourages the Department to ensure balance in the award of
                                                                              funds to achieve varied aims in fostering broader adoption of clean
                                                                              vehicles and installation of supporting infrastructure. The Com-
                                                                              mittee further encourages the Department to prioritize projects
                                                                              that can contribute the most greenhouse gases reduction. The Com-
                                                                              mittee encourages the Department to work with the Department of
                                                                              Transportation and industry on coordinating efforts to deploy elec-
                                                                              tric vehicle [EV] charging infrastructure. The Committee encour-
                                                                              ages the Department to explore ways in which the Clean Cities
                                                                              Program can leverage funding to provide greater support for elec-
                                                                              trification efforts, including in underserved communities, recog-
                                                                              nizing the strong emissions reduction and public health benefits de-
                                                                              livered by electrification.
                                                                                 The Committee recommends $10,000,000 to continue improving
                                                                              the energy efficiency of commercial off-road vehicles, including up
                                                                              to $5,000,000 for fluid power systems. These funds shall be award-
                                                                              ed through a competitive solicitation in which university and in-
                                                                              dustry teams are eligible to apply.
                                                                                 The Committee recommends up to $5,000,000 for research on di-
                                                                              rect injection, engine technology, and the use of dimethyl ether as
                                                                              fuel, and encourages continued research and development as appro-
                                                                              priate in advanced combustion and vehicle engine technology effi-
                                                                              ciency in propane engines used for light and medium-duty applica-
                                                                              tions.
                                                                                 The Committee recommends up to $10,000,000 to address tech-
                                                                              nical barriers to the increased use of natural gas vehicles for
                                                                              medium- and heavy-duty on-road natural gas engine research and
                                                                              development, including energy efficiency improvements, emission




amozie on DSK123TN23PROD with REPORTS
                                                                              after-treatment technologies, fuel system enhancements, and new




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00078   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              79

                                                                              engine development, natural gas storage, natural gas engines, and
                                                                              fueling infrastructure optimizations.
                                                                                 The Committee recognizes novel engine designs can achieve sig-
                                                                              nificant efficiency improvements and recommends within available
                                                                              funds up to $10,000,000 to support research and development of
                                                                              two-stroke opposed-piston engines, to be conducted by industry-led
                                                                              teams.
                                                                                 The Committee recognizes the need for clarity regarding the
                                                                              availability, affordability, and reliability of direct current fast char-
                                                                              gers for electric vehicles. Last year, the Committee directed the De-
                                                                              partment to produce a report, in partnership with the national lab-
                                                                              oratories, on the technologies and calculation methods that meet
                                                                              the tentative code for EV charger metering and testing published
                                                                              in the National Institute of Standards and Technology Handbook
                                                                              44, Section 3.40. The Committee is still awaiting this report and
                                                                              directs the Department to provide the report and briefing to the
                                                                              Committee immediately after enactment of this act.
                                                                                 Bioenergy      Technologies.—The         Committee       recommends
                                                                              $284,500,000 for Bioenergy Technologies. The Committee encour-
                                                                              ages the Department to focus on defining and meeting technical
                                                                              targets that reduce cost of sustainable aviation fuels through the
                                                                              conversion of low-cost waste carbon as feedstocks. These efforts
                                                                              shall take into account relevant global supply chains and shall be
                                                                              coordinated with other Federal agencies, the aviation industry, Na-
                                                                              tional Labs, and universities.
                                                                                 Within available funds, the Committee recommends up to
                                                                              $5,000,000 for continued support of the development and testing of
                                                                              new domestic manufactured low-emission, high-efficiency, residen-
                                                                              tial wood heaters that supply easily accessed and affordable renew-
                                                                              able energy and have the potential to reduce the national costs as-
                                                                              sociated with thermal energy. Further, the Committee recommends
                                                                              $3,000,000 for research at commercially-relevant processing scales
                                                                              into affordable wood chip fractionation technologies and other proc-
                                                                              essing improvements relevant to thermal deoxygenation biorefin-
                                                                              eries in order to enable economic production of cellulose nanomate-
                                                                              rials and economic upgrading of hemicelluloses and lignin. High-
                                                                              value coproducts made from nanocellulose, hemicelluloses, and
                                                                              lignin can improve the cost structure for biorefineries producing
                                                                              transportation fuels and thereby help the industry meet the De-
                                                                              partment’s $3 per gasoline gallon equivalent near-term price target
                                                                              and move quickly towards $2 per gasoline gallon equivalent.
                                                                                 The Committee directs the Department to sustain the investment
                                                                              in the development of algal biofuels. Within available funds, the
                                                                              Committee recommends not less than $40,000,000 for Advanced
                                                                              Algal Systems to sustain the investment in development of algal
                                                                              biofuels. The Committee recommends $10,000,000 to continue re-
                                                                              search and development activities to support carbon dioxide cap-
                                                                              ture from the atmosphere into highly alkaline solutions using
                                                                              algae-to-energy technologies. The program is directed to continue
                                                                              collaboration with the Office of Science and FECM in this area.
                                                                                 The Committee further recommends not less than $100,000,000
                                                                              for Conversion Technologies. Within available funds, the Com-
                                                                              mittee recommends not less than $30,000,000 for the Agile Bio-




amozie on DSK123TN23PROD with REPORTS
                                                                              Foundry, including $10,000,000 of additional funding to continue




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00079   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              80

                                                                              developing methods and technologies to advance biological engi-
                                                                              neering, support expanded focus on Artificial Intelligence and Ma-
                                                                              chine Learning and software development to improve the predictive
                                                                              design of organisms and pathways and to build tools accessible to
                                                                              the wider scientific community for the purchase of state-of-tech-
                                                                              nology instrumentation that will enable better and more expansive
                                                                              collaborations. Some portion of the additional funding shall be used
                                                                              to support Directed Funding Opportunities to meet the demand for
                                                                              collaboration by industry partners.
                                                                                 Further, within available funds for Conversion Technologies, the
                                                                              Committee recommends $5,000,000 to demonstrate the use of and
                                                                              improve the efficiency of community-scale digesters with priority
                                                                              given for projects in States and Tribal areas that have adopted
                                                                              statutory requirements for the diversion of a high percentage of
                                                                              food material from municipal waste streams.
                                                                                 Within available funds, the Committee supports research to de-
                                                                              velop the foundation for scalable techniques to use carbon dioxide
                                                                              produced in various plants, such as in biorefineries, to produce
                                                                              higher value fuels, chemicals, or materials.
                                                                                 Hydrogen and Fuel Cell Technologies.—The Committee rec-
                                                                              ommends $200,000,000 for Hydrogen and Fuel Cell Technologies to
                                                                              maintain a diverse program which focuses on early-, mid-, and late-
                                                                              stage research and development and technology acceleration in-
                                                                              cluding market transformation. The Committee encourages regular
                                                                              consultation with industry to avoid duplication of private-sector ac-
                                                                              tivities and ensure retention of fuel cell technology and systems de-
                                                                              velopment in the United States.
                                                                                 The Committee recommends not less than $100,000,000 for
                                                                              H2@Scale activities to support the development of hydrogen as a
                                                                              clean energy resource. Of this amount, the Committee recommends
                                                                              up to $60,000,000 for technologies to advance hydrogen use for
                                                                              heavy-duty transportation and industrial applications. Hydrogen
                                                                              can be developed to serve a broad range of applications, including
                                                                              heavy-duty transportation and as a clean heat source for industry.
                                                                                 Within available funds, the Committee recommends not less than
                                                                              $45,000,000 for Hydrogen Technologies for efforts to reduce the cost
                                                                              and improve the performance of hydrogen generation and storage
                                                                              systems, hydrogen measurement devices for fueling stations, hydro-
                                                                              gen compressor components, and hydrogen station dispensing com-
                                                                              ponents. The Department shall continue research on novel onboard
                                                                              hydrogen tank systems, as well as trailer delivery systems to re-
                                                                              duce cost of delivered hydrogen. Further, the Department is di-
                                                                              rected to support research and development activities that reduce
                                                                              the use of platinum group metals provide improvements in elec-
                                                                              trodes and membranes and balance-of-plant components and sys-
                                                                              tems.
                                                                                 The Committee further recommends $10,000,000 for Safety,
                                                                              Codes, and Standards to maintain a robust program and engage
                                                                              State and local regulatory and code officials to support their tech-
                                                                              nical needs relative to infrastructure and vehicle safety. The De-
                                                                              partment is encouraged to engage on codes and standards for de-
                                                                              veloping fuel cell and hydrogen markets, such as heavy-duty
                                                                              trucks. The Department is also encouraged to continue coordination




amozie on DSK123TN23PROD with REPORTS
                                                                              between U.S. and international standard bodies to ensure there is




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00080   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              81

                                                                              one set of open non-proprietary global standards for fuel cell and
                                                                              hydrogen technologies.
                                                                                The Committee encourages the Secretary to work with the Sec-
                                                                              retary of Transportation and industry on coordinating efforts to de-
                                                                              ploy hydrogen fueling infrastructure.
                                                                                                                 RENEWABLE ENERGY
                                                                                 Solar Energy.—The Committee recommends $300,000,000 for
                                                                              Solar Energy.
                                                                                 Within available funds, the Committee recommends not less than
                                                                              $60,000,000 for Concentrating Solar Power research, development,
                                                                              and demonstration to reduce overall system costs, better integrate
                                                                              subsystem components, develop higher-temperature receivers, and
                                                                              improve the design of solar collection and thermal energy storage.
                                                                                 The Committee recommends not less than $50,000,000 for Bal-
                                                                              ance of System Soft Costs efforts focused on reducing the time and
                                                                              costs for permitting, inspecting, and interconnecting distributed
                                                                              solar and storage projects installed behind the customer’s meter
                                                                              through standardized requirements, online application systems,
                                                                              and grant awards to localities which voluntarily adopt the Solar
                                                                              Automated Permit Processing platform. Within available funds for
                                                                              Balance of Systems Soft Costs, $5,000,000 is for the National Com-
                                                                              munity Solar Partnership program.
                                                                                 Within available funds, the Committee recommends a competi-
                                                                              tive solicitation for reequipping, expanding, or establishing ad-
                                                                              vanced solar manufacturing facilities, including not less than
                                                                              $25,000,000 for a competitive solicitation for advanced solar power
                                                                              demonstration projects, including perovskite and novel applica-
                                                                              tions.
                                                                                 The Committee encourages the Department to expand work to
                                                                              lower barriers to solar adoption for low-income households, renters,
                                                                              multifamily homes, and racially diverse communities and rec-
                                                                              ommends not less than $20,000,000 for these activities. This in-
                                                                              cludes exploring and providing resources on financing and business
                                                                              models that are well-suited to these households and communities.
                                                                                 The Committee directs the Department to advance demonstra-
                                                                              tion, field testing, financing, and deployment of distributed solar
                                                                              and energy storage technologies for households and communities in
                                                                              Tribal nations that lack connection to the electric grid. The Solar
                                                                              Energy Technologies Office and OE are directed to collaborate on
                                                                              issuing these funds.
                                                                                 The Committee encourages the Department to continue work to
                                                                              improve co-siting of solar photovoltaics with ecosystem restoration
                                                                              activities and to reduce the environmental impact of solar
                                                                              photovoltaics.
                                                                                 The Committee also encourages the Department to develop pro-
                                                                              grams that support a skilled, robust, and diverse solar energy
                                                                              workforce, including indirect solar workers in jobs related to fi-
                                                                              nancing and permitting.
                                                                                 Wind Energy.—The Committee recommends $204,870,000 for
                                                                              Wind Energy.
                                                                                 The Department is directed to give priority to stewarding the as-
                                                                              sets and optimizing the operations of the Department-owned wind




amozie on DSK123TN23PROD with REPORTS
                                                                              energy research and development facilities. Within available funds,




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00081   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              82

                                                                              the Committee recommends not less than $30,000,000 for the Na-
                                                                              tional Wind Technology Center, and up to $5,000,000 for research
                                                                              and operations of the Integrated Energy System at Scale, a large-
                                                                              scale research platform using high-performance computing, mod-
                                                                              eling and simulation, including improved models that can be used
                                                                              to understand atmospheric and wind power plant flow physics, and
                                                                              reliability and grid integration efforts.
                                                                                 The Department is directed to support the advancement of inno-
                                                                              vative technologies for offshore wind development including fresh-
                                                                              water, deep water, shallow water, and transitional depth installa-
                                                                              tions. Further, the Committee recommends not less than
                                                                              $30,000,000 for the Department to prioritize early-stage research
                                                                              on materials and manufacturing methods and advanced compo-
                                                                              nents that will enable high quality wind resources to compete in
                                                                              the marketplace without the need for subsidies, and on activities
                                                                              that will accelerate fundamental offshore specific research and de-
                                                                              velopment such as those that target technology and deployment
                                                                              challenges unique to U.S. waters. The Department is directed to
                                                                              provide to the Committees on Appropriations of both Houses of
                                                                              Congress not later than 180 days after the enactment of this act
                                                                              a report that outlines regional and national strategies to accelerate
                                                                              and maximize the effectiveness, reliability, and sustainability of
                                                                              U.S. offshore wind deployment and operation with partners from
                                                                              institutions of higher education, research institutions, national lab-
                                                                              oratories, the private sector, and state and local governments. The
                                                                              study shall address the need for expanded work in this area to po-
                                                                              tentially include an additional offshore wind consortium. In addi-
                                                                              tion, the Department is directed to support innovative offshore
                                                                              wind demonstration projects to optimize their development, design,
                                                                              construction methods, testing plans, and economic value propo-
                                                                              sition. The Committee recommends not less than $10,000,000 to
                                                                              support additional project development and pre-construction activi-
                                                                              ties for offshore wind demonstration projects to help ensure suc-
                                                                              cess.
                                                                                 The Committee encourages the Department to prioritize distrib-
                                                                              uted wind technologies that reduce costs and improve performance
                                                                              and to collaborate with industry to invest in the development and
                                                                              demonstration of technologies and practices that advance distrib-
                                                                              uted wind. Within available funds, the Committee recommends
                                                                              $10,000,000 for distributed wind.
                                                                                 Water Power.—The Committee recommends $196,560,000 for
                                                                              Water Power.
                                                                                 The Department is encouraged to consider the use of existing au-
                                                                              thorities to waive cost share for water power technology research,
                                                                              development, demonstration, and deployment activities as appro-
                                                                              priate.
                                                                                 The Committee recommends $142,000,000 for marine energy.
                                                                              The Committee recommendation includes not less than $60,000,000
                                                                              for industry-led competitive solicitations to increase energy cap-
                                                                              ture, improve reliability, and to assess and monitor environmental
                                                                              effects of marine energy systems and components at a variety of
                                                                              scales, including full scale prototypes. The Committee recommends
                                                                              not less than $24,000,000 for the Powering the Blue Economy ini-




amozie on DSK123TN23PROD with REPORTS
                                                                              tiative.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00082   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              83

                                                                                 Within available funds, the recommendation provides up to
                                                                              $20,000,000 to address infrastructure needs at marine energy tech-
                                                                              nology testing sites.
                                                                                 The Committee is concerned that a lack of dedicated funding
                                                                              within existing resources and uncertainty in frequency has a
                                                                              unique impact on university capacity to support needed
                                                                              foundational research and develop the skilled workforce to accel-
                                                                              erate development of the marine energy sector. The recommenda-
                                                                              tion provides up to $24,000,000 for foundational research activities
                                                                              led by universities and other research institutions affiliated with
                                                                              the National Marine Energy Centers.
                                                                                 The Committee recommends up to $10,000,000 to address tech-
                                                                              nology testing infrastructure needs, including planning activities
                                                                              for the staged development of an ocean current test facility and up-
                                                                              grades to facilities that provide cost effective open water access for
                                                                              prototype testing.
                                                                                 The Committee recommends up to $10,000,000 to continue devel-
                                                                              opment and construction of an open water, fully energetic, grid con-
                                                                              nected wave energy test facility, and up to $8,000,000 for continu-
                                                                              ation of the Testing Expertise and Access for Marine Energy Re-
                                                                              search initiative. The Committee recommends the Department con-
                                                                              tinue to coordinate with the U.S. Navy and other Federal agencies
                                                                              on marine energy technology development for national security and
                                                                              other applications. Within available funds, the Committee rec-
                                                                              ommends not less than $5,000,000 to continue operations at the At-
                                                                              lantic Marine Energy Center to accelerate the transition of wave
                                                                              and tidal energy technologies to market.
                                                                                 The Committee is aware of a growing interest from the private
                                                                              sector in advancing collaborative projects between recreational ma-
                                                                              rine manufacturers and national laboratories to support next gen-
                                                                              eration marine propulsion research, and encourages the Depart-
                                                                              ment to work with industry stakeholders to address funding bar-
                                                                              riers to manufacturers who wish to engage with the Department to
                                                                              advance the testing of alternative fuels, including carbon neutral
                                                                              sustainable biofuels.
                                                                                 The Committee recognizes the challenges of decarbonizing re-
                                                                              mote communities and the maritime sector. The Department is en-
                                                                              couraged to continue to focus on activities addressing the integra-
                                                                              tion of clean energy systems for remote communities and port elec-
                                                                              trification, including the demonstration of marine, distributed
                                                                              wind, solar, energy storage, improved microgrids, and local produc-
                                                                              tion of zero-carbon fuels.
                                                                                 Within available funds recommended, $5,000,000 shall be used
                                                                              for the environmental analyses and engineering of potential run-of-
                                                                              river hydrokinetic facilities at two sites with high electricity costs
                                                                              and diesel use, as determined by the Secretary. Funding may be
                                                                              used for such related field work, engineering, and analysis nec-
                                                                              essary for a future FERC license.
                                                                                 Of the funds available for conventional hydropower and pumped
                                                                              storage activities, the Committee recommends $10,000,000 for the
                                                                              purposes of section 242 and section 243 of the Energy Policy Act
                                                                              of 2005.
                                                                                 Geothermal      Technologies.—The       Committee     recommends




amozie on DSK123TN23PROD with REPORTS
                                                                              $130,380,000 for Geothermal Technologies. The Department is di-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00083   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              84

                                                                              rected to focus on all stages of research and development, market
                                                                              transformation activities to advance geothermal strategies, and im-
                                                                              plementation of the recommendations outlined in the GeoVision
                                                                              study.
                                                                                 The Committee directs the Department to continue its efforts to
                                                                              identify and characterize geothermal resources in areas with no ob-
                                                                              vious surface expressions. Awards for geothermal exploration ac-
                                                                              tivities, including test drilling, shall recognize the diversity of geo-
                                                                              logic terrains, resource depths, and exploration costs across the
                                                                              United States.
                                                                                 The Committee recommends up to $60,380,000 for enhanced geo-
                                                                              thermal system demonstrations and next-generation geothermal
                                                                              demonstration projects in diverse geographic areas. The Committee
                                                                              directs the Department to continue its efforts to identify prospec-
                                                                              tive geothermal resources in areas with no obvious surface expres-
                                                                              sions.
                                                                                                                  ENERGY EFFICIENCY

                                                                                Advanced       Manufacturing.—The        Committee      recommends
                                                                              $560,500,000 for Advanced Manufacturing.
                                                                                The Committee recommends $25,000,000 for the Manufacturing
                                                                              Demonstration Facility [MDF] and the Carbon Fiber Technology
                                                                              Facility. Within available funds for MDF, $5,000,000 is provided
                                                                              for the development of processes for materials solutions.
                                                                                The Committee recognizes the significant grid resilience benefits
                                                                              that distributed-scale highly-efficient natural gas engines can pro-
                                                                              vide to the nation’s electricity grid and notes the need for more ag-
                                                                              gressive Federal support for research and development of this
                                                                              promising technology. Therefore, the Committee recommends
                                                                              $4,000,000 to be competitively awarded to industry to develop high-
                                                                              ly efficient natural gas engines to be used in electricity generation.
                                                                              Preference shall be given to projects that prioritize fast demand re-
                                                                              sponse and improved integration with building and institution-
                                                                              based microgrid systems, to further the resiliency of the nation’s
                                                                              electrical grid.
                                                                                The Committee recognizes the importance of developing recycla-
                                                                              ble wind turbine blades and directs the Department to support re-
                                                                              search and development in innovative approaches to enable manu-
                                                                              facturing of wind turbine blades with novel thermoplastic resin sys-
                                                                              tems to create brand new reversible and recyclable thermoplastic
                                                                              resins for future use in blade manufacturing. Within available
                                                                              funds, the Committee recommends $5,000,000 for development of
                                                                              thermoplastic resin systems research.
                                                                                Within available funds for the Industrial Technical Assistance
                                                                              program, the Committee recommends $12,000,000 to provide ongo-
                                                                              ing support for the Combined Heat and Power [CHP] Technical As-
                                                                              sistance Partnerships [TAPs] and related CHP Technical Partner-
                                                                              ship activities at the Department, including $5,000,000 for the
                                                                              TAPs and $7,000,000 for related CHP activities. The Committee
                                                                              also encourages the Department to prioritize research, develop-
                                                                              ment, and demonstration of district energy systems and work to ac-
                                                                              celerate greater deployment of district energy systems in commu-
                                                                              nities, campuses, industries, and cities nationwide by supporting




amozie on DSK123TN23PROD with REPORTS
                                                                              adaptive regional and local technology, and market opportunities.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00084   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              85

                                                                              The Committee further directs the Department to collaborate with
                                                                              industry on the potential energy efficiency and energy security
                                                                              gains to be realized with district energy systems.
                                                                                 Within available funds, the Committee recommends up to
                                                                              $20,000,000 for the Industrial Assessment Center [IAC] program.
                                                                              The Committee further directs the Department to apply the addi-
                                                                              tional funding to support regions that are currently designated as
                                                                              underserved through the IAC program. Within the funds provided
                                                                              for the Industrial Assessment Centers, the Committee recommends
                                                                              up to $4,000,000 for applied technical assistance and the purchase
                                                                              and pilot testing of innovative technology. This equipment and
                                                                              technical assistance shall be provided to municipal or industrial en-
                                                                              tities that face significant water treatment challenges and for
                                                                              which piloting such technology would be of significant benefit.
                                                                                 The Committee acknowledges the contributions of the Clean En-
                                                                              ergy Manufacturing Innovation Institutes [CEMIs] program as an
                                                                              important component of efforts to combat climate change by reduc-
                                                                              ing carbon emissions from manufacturing, promoting recycling and
                                                                              conservation, and creating new companies and jobs for a greener
                                                                              economy. The Committee further believes that the continuation of
                                                                              Federal participation in the CEMI program is vital in order to
                                                                              maintain significant private investment and allow the Institutes to
                                                                              realize the goals for which they were established. Within available
                                                                              funds, the Committee encourages the Department to continue work
                                                                              of the CEMIs.
                                                                                 The Committee supports additive manufacturing technologies for
                                                                              wind energy applications. Within available funds, $4,000,000 to
                                                                              support additive manufacturing work on large wind blades that
                                                                              will allow for rapid prototyping, tooling, fabrication, and testing;
                                                                              $7,000,000 for additive manufacturing of wind turbine components;
                                                                              and $18,000,000 for advanced wind turbine blade manufacturing
                                                                              research, including additive composite tip technology, automation,
                                                                              and sustainability.
                                                                                 The Committee recognizes the important role large-area additive
                                                                              manufacturing can play in helping to advance the deployment of
                                                                              building, transportation, and clean energy technologies. The Com-
                                                                              mittee directs the Department to further foster the partnership be-
                                                                              tween the national laboratories, universities, and industry to use
                                                                              bio-based thermoplastics composites, such as micro- and nanocellu-
                                                                              losic materials, and large-area 3–D printing to overcome challenges
                                                                              to the cost and deployment of building, transportation, and energy
                                                                              technologies. In addition, the Committee recommends up to
                                                                              $20,000,000 to continue the development of additive manufacturing
                                                                              involving nanocellulosic feedstock materials made from forest prod-
                                                                              ucts to overcome challenges to the cost and deployment of building,
                                                                              transportation, and energy technologies, and encourages the De-
                                                                              partment to leverage expertise and capabilities for large-scale addi-
                                                                              tive manufacturing through partnerships between universities and
                                                                              the MDF.
                                                                                 The Committee notes that drying processes consume approxi-
                                                                              mately 10 percent of the process energy used in the manufacturing
                                                                              sector and directs that within available funds, up to $10,000,000 is




amozie on DSK123TN23PROD with REPORTS
                                                                              recommended to be used to issue a competitive solicitation for uni-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00085   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              86

                                                                              versity and industry-led teams to improve the efficiency of indus-
                                                                              trial drying processes.
                                                                                 The Committee recognizes that progress is occurring at the dem-
                                                                              onstration level of extracting lithium from geothermal brine to cre-
                                                                              ate lithium chloride, but further research and development is need-
                                                                              ed to convert the extracted lithium chloride into lithium hydroxide,
                                                                              one of the final components of lithium-ion batteries. The Com-
                                                                              mittee recommends $15,000,000 to continue technology develop-
                                                                              ment to convert lithium chloride from geothermal brine into lith-
                                                                              ium hydroxide that will inform the design of a commercial-scale fa-
                                                                              cility that will both extract lithium from geothermal brine and con-
                                                                              vert the lithium in geothermal brine into the lithium hydroxide.
                                                                                 The Committee recognizes the growing need for the use of more
                                                                              sustainable chemistry in consumer and commercial products, which
                                                                              can create significant value as an economic opportunity for U.S.
                                                                              manufacturing. The Committee recommends $5,000,000 to support
                                                                              sustainable chemistry research and development. The fiscal year
                                                                              2021 Act directed the Department to provide a report exploring
                                                                              how incorporating sustainable chemistry in consumer and commer-
                                                                              cial manufacturing processes fits within its research and develop-
                                                                              ment portfolio and can benefit these processes. The Committee is
                                                                              still awaiting this report and directs the Department to provide the
                                                                              report to the Committee not less than 30 days after enactment of
                                                                              this act.
                                                                                 The Committee recommends $5,000,000 to continue to develop
                                                                              and industrialize a low-cost polymer infiltration process for the fab-
                                                                              rication of silicon carbide components. The Committee recognizes
                                                                              the Department’s expertise in developing materials and processes
                                                                              for very high temperature applications. Silicon carbide ceramic ma-
                                                                              trix composites are a proven, capable material for high temperature
                                                                              applications.
                                                                                 The Committee recommends not less than $5,000,000 to apply
                                                                              the Department the Office of Science’s leadership computing facil-
                                                                              ity expertise in machine learning to increase efficiencies in large
                                                                              scale, high rate, aerostructures manufacturing. The Department is
                                                                              encouraged to leverage best practices from large-scale, high-rate
                                                                              commercial composite aerostructure manufacturing.
                                                                                                              BUILDING TECHNOLOGIES

                                                                                 The Committee recommends $382,000,000 for Building Tech-
                                                                              nologies.
                                                                                 Across all of these efforts, where appropriate, the Buildings Tech-
                                                                              nologies Office is encouraged to collaborate with OE and CESER,
                                                                              especially including efforts pertaining to improved building-to-grid
                                                                              interactions and integration of energy storage and renewable en-
                                                                              ergy. Within available funds for Emerging Technologies, the Com-
                                                                              mittee encourages the Department to make funding available for
                                                                              Heating, Ventilation, and Air Conditioning [HVAC] and Refrigera-
                                                                              tion Research, Development and deployment, including heat
                                                                              pumps, heat pump water heaters and boilers. The Department
                                                                              shall focus its efforts to address whole building energy performance
                                                                              and cost issues to inform efforts to advance beneficial electrification
                                                                              and greenhouse gas mitigation without compromising building en-




amozie on DSK123TN23PROD with REPORTS
                                                                              ergy performance. The Committee encourages the Department to




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00086   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              87

                                                                              develop strategies and activities to increase adoption of energy-sav-
                                                                              ing and emissions-saving technologies for low-income households,
                                                                              multi-family buildings, and minority communities.
                                                                                 Within the amounts provided for the Building Technologies Of-
                                                                              fice, the recommendation includes not less than $50,000,000 for ad-
                                                                              vanced HVAC and dehumidification manufacturing scale-up
                                                                              projects.
                                                                                 Equipment and Building Standards.—The Committee rec-
                                                                              ommends $62,000,000 for Equipment and Buildings Standards.
                                                                                 The Committee recommends $20,000,000 for the Building Energy
                                                                              Codes Program to increase training, including certifications, and
                                                                              provide technical assistance to states, local governments, regional
                                                                              collaboratives, workforce development providers, homebuilders, of-
                                                                              fice builders, architects and engineers, and other organizations that
                                                                              develop, adopt, or assist with the adoption or compliance with
                                                                              model building energy codes and standards to improve energy effi-
                                                                              ciency and resilience.
                                                                                 The Committee supports continued research to quantify the resil-
                                                                              ience impacts of energy codes for buildings, occupants, and commu-
                                                                              nities. Recognizing that the pandemic has presented challenges to
                                                                              permit processing for building departments reliant on paper-based
                                                                              systems, the Committee encourages the development of cloud-based
                                                                              software that can facilitate permit processing for projects that con-
                                                                              serve energy or promote resilience as well as efforts to help depart-
                                                                              ments modernize systems.
                                                                                 The Committee directs EERE to carry out the Grid-interactive
                                                                              Efficient Buildings [GEB] program to ensure that a high level of
                                                                              energy efficiency is a core element of the program and a baseline
                                                                              characteristic for GEBs, which are also connected, smart, and flexi-
                                                                              ble. EERE shall engage with the public and private sectors, includ-
                                                                              ing the building and manufacturing industries and state and local
                                                                              governments, to share information on GEB technologies, costs, and
                                                                              benefits, and to provide information to position American compa-
                                                                              nies to lead in this area. In addition, EERE is reminded to follow
                                                                              the National Technology Transfer and Advancement Act and re-
                                                                              lated guidance in testing and applying relevant existing and emerg-
                                                                              ing standards developed by non-governmental organizations.
                                                                                 Within available funds, the Committee recommends $72,000,000
                                                                              for the Residential Building Integration program. The Committee
                                                                              recommends this increase to advance building upgrades and weath-
                                                                              erization of homes, as well as to advance work in grid-integrated
                                                                              efficient buildings and inclusion of smart grid systems, demand
                                                                              flexibility and new initiatives in workforce training to ensure the
                                                                              technology and research findings reach practitioners. The Com-
                                                                              mittee encourages funding to be concentrated on industry teams to
                                                                              facilitate research, demonstrate and test new systems, and facili-
                                                                              tate widespread deployment and dissemination of information and
                                                                              best practices through direct engagement with builders, the con-
                                                                              struction trades, equipment manufacturers, smart grid technology
                                                                              and systems suppliers, integrators, and state and local govern-
                                                                              ments and other market transformation activities. Further, the
                                                                              Committee recommends funding to facilitate deep whole-house en-
                                                                              ergy efficiency retrofits, including outreach, engagement and train-




amozie on DSK123TN23PROD with REPORTS
                                                                              ing to private sector contractors, including continuing efforts to ad-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00087   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              88

                                                                              vance smart home technology. The Committee supports continued
                                                                              efforts to address property rating and valuation in commercial and
                                                                              residential buildings as a way to improve the transparency of en-
                                                                              ergy utilization in buildings for persons and companies buying or
                                                                              leasing property.
                                                                                 The Committee encourages the Department to continue to ex-
                                                                              plore research and development that can advance future natural
                                                                              gas and propane gas systems and appliances to meet consumer de-
                                                                              mand for high efficiency and environmentally friendly products.
                                                                              The Committee recommends continued research, development, and
                                                                              market transformation programs on energy efficiency efforts re-
                                                                              lated to the direct use of natural gas and propane gas in residential
                                                                              applications, including gas heat pump heating with power genera-
                                                                              tion and water heating, on-site combined heat and power, and gas
                                                                              appliance venting, and on site (micro) combined heat and power to
                                                                              include cooling integration with renewables.
                                                                                 Within available funds, the Committee recommends $74,000,000
                                                                              for the Commercial Building Integration program for core research
                                                                              and development of more cost-effective integration techniques and
                                                                              technologies that could help the transition toward deep retrofits. In
                                                                              addition, the Committee encourages the Department to increase
                                                                              engagement with private sector stakeholders to develop market-
                                                                              transforming policies and investments in commercial building ret-
                                                                              rofits.
                                                                                 The Department is encouraged to prioritize understanding of re-
                                                                              gional differences in energy systems and their impact on adoption
                                                                              of transactive energy technologies. The recommendation provides
                                                                              not less than $30,000,000 for Buildings-to-Grid integration re-
                                                                              search and development consistent with a transactive energy sys-
                                                                              tem and in coordination with the OE transactive energy systems
                                                                              program.
                                                                                 The Committee notes that the Department has missed over 30
                                                                              legal deadlines related to energy efficiency standards mandated by
                                                                              Congress. The Committee understands that the Department is
                                                                              working to complete these rulemakings expeditiously and directs
                                                                              the Department to finalize these standards as soon as practicable.
                                                                              The Committee directs the Department to report within 30 days of
                                                                              enactment of this act on the status of each of these standards, and
                                                                              any funding or staffing barriers to finalizing these standards.
                                                                                                   FEDERAL ENERGY MANAGEMENT PROGRAM

                                                                                 The Committee recommends $60,000,000 for the Federal Energy
                                                                              Management Program. The recommendation provides not less than
                                                                              $20,000,000 for the Department to continue its work through the
                                                                              Assisting Federal Facilities with Energy Conservation Technologies
                                                                              program.
                                                                                 The recommendation provides not less than $2,000,000 for work
                                                                              force development and the Performance Based Contract National
                                                                              Resource Initiative. The fiscal year 2020 Act directed the Depart-
                                                                              ment to provide a report that outlines the types of technical and
                                                                              financial expertise the Department is suited to provide and in-
                                                                              cludes an analysis of the available infrastructure work that can be
                                                                              accomplished through performance-based contracts over a 10-year




amozie on DSK123TN23PROD with REPORTS
                                                                              period and the resources necessary to achieve this goal. The Com-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00088   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              89

                                                                              mittee is still awaiting this report and directs the Department to
                                                                              provide this report not later than 15 days after enactment of this
                                                                              act.
                                                                                The Committee directs the Secretary to establish an improved
                                                                              process to assist in guiding infrastructure investments through en-
                                                                              ergy performance contracts management, including, but not limited
                                                                              to Energy Savings Performance Contracts and Utility Energy Sav-
                                                                              ings Contracts, in order to effectively and efficiently reduce energy
                                                                              costs, reduce greenhouse gas emissions, and improve facilities. The
                                                                              Committee directs the Secretary to ensure the availability of suffi-
                                                                              cient acquisition FTEs to address energy saving measures, as well
                                                                              as to streamline and find efficiencies in the approval of projects to
                                                                              continue to provide climate, resilience, and economic benefits. The
                                                                              Committee encourages the Secretary to leverage energy savings
                                                                              performance contracts so capital improvement projects involving
                                                                              energy systems, energy controls, and building envelopes awarded
                                                                              in fiscal year 2022 ensure maximum return on investment to the
                                                                              taxpayer.
                                                                                         WEATHERIZATION AND INTERGOVERNMENTAL PROGRAM

                                                                                 The Committee recommends $508,000,000 for the Weatherization
                                                                              and Intergovernmental Program.
                                                                                 Within this amount, $398,000,000 is recommended for Weather-
                                                                              ization, including $375,000,000 for the Weatherization Assistance
                                                                              Program [WAP] and $8,000,000 for Training and Technical Assist-
                                                                              ance. The Committee recommends $70,000,000 for State Energy
                                                                              Program [SEP] grants. The Committee encourages the Department
                                                                              to work with all relevant stakeholders to identify efficiencies for de-
                                                                              livering weatherization services and examine options to streamline
                                                                              policies and procedures when other funding sources are utilized in
                                                                              conjunction with funds from the Department.
                                                                                 The Committee supports WAP’s continued participation in the
                                                                              interagency working group on Healthy Homes and Energy with the
                                                                              Department of Housing and Urban Development. The Department
                                                                              is encouraged to further coordinate with the Office of Lead Hazard
                                                                              Control and Healthy Homes on energy-related housing projects.
                                                                              The Committee encourages the Department to begin tracking the
                                                                              occurrence of window replacements, which supports the reduction
                                                                              of lead-based paint hazards in homes.
                                                                                 The Committee recognizes the importance of providing Federal
                                                                              funds under the Weatherization and Intergovernmental Program to
                                                                              States and Tribes in a timely manner to avoid any undue delay of
                                                                              services to eligible low-income households, and to encourage local
                                                                              high-impact energy efficiency and renewable energy initiatives and
                                                                              energy emergency preparedness. Therefore, the full amount of the
                                                                              funds recommended for WAP and the SEP shall be obligated to
                                                                              States, Tribes, and other direct grantees not later than 60 days
                                                                              after enactment of this act. The Committee is concerned with the
                                                                              reduction of mission-critical staff at the Office of Weatherization
                                                                              and Intergovernmental Programs and directs the office to achieve
                                                                              staffing levels that will allow it to provide robust training, tech-
                                                                              nical assistance, and oversight for WAP and SEP.
                                                                                 Within available funds, the Committee recommends that




amozie on DSK123TN23PROD with REPORTS
                                                                              $1,000,000 be made available to WAP grant recipients that have




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00089   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                                                      90

                                                                              previously worked with the Department via the Weatherization In-
                                                                              novation Pilot Program, for the purpose of developing and imple-
                                                                              menting state and regional programs to treat harmful substances,
                                                                              including vermiculite.
                                                                                 Weatherization Readiness Fund.—The Committee supports the
                                                                              creation of a new Weatherization Readiness Fund to enable more
                                                                              low-income households to receive WAP support by providing funds
                                                                              to address structural and health and safety issues to reduce the
                                                                              frequency of deferred homes that are not weatherization ready
                                                                              when WAP work crews enter the home to perform retrofit services.
                                                                                 Local Government Clean Energy Workforce Program.—The Com-
                                                                              mittee supports the Local Government Clean Energy Workforce
                                                                              Program to provide competitive awards, on-site capacity, peer ex-
                                                                              changes, and technical assistance to support the development and
                                                                              deployment of transformative clean energy programs that create
                                                                              good paying jobs working with qualifying local governments and
                                                                              Tribal Nations, with a focus on energy communities and disadvan-
                                                                              taged or small-to-medium jurisdictions.
                                                                                 The Department is encouraged to consider projects that imple-
                                                                              ment best practices to advance energy efficiency adoption, building
                                                                              and vehicle electrification, grid modernization, distributed elec-
                                                                              tricity generation, and workforce development at the local level.
                                                                              These activities shall include work with and support for organiza-
                                                                              tions that convene and support municipal governments.
                                                                                                                                             CORPORATE SUPPORT
                                                                                Strategic Programs.—The Committee recommends $20,000,000
                                                                              for Strategic Programs.
                                                                                Facilities and Infrastructure.—The Committee recommends
                                                                              $8,000,000 for the Energy Materials and Processing at Scale re-
                                                                              search capability at the National Renewable Energy Laboratory.
                                                                                Congressionally Directed Spending.—The Committee rec-
                                                                              ommends $77,047,000 for the following list of projects that provide
                                                                              for research, development, and demonstration for Energy Efficiency
                                                                              and Renewable Energy activities or programs. The Committee re-
                                                                              minds recipients that statutory cost sharing requirements may
                                                                              apply to these projects.
                                                                                                                              ENERGY EFFICIENCY AND RENEWABLE ENERGY
                                                                                                                                                       [In thousands of dollars]

                                                                                                                                                    Project Name                                                                               Recommendation

                                                                              Accelerating Heat Pump Adoption by Lower–Income Households, AK ................................................................                                            420
                                                                              Asia-Pacific Microgrid Development and Training, HI ........................................................................................                             1,000
                                                                              Blue Earth County’s Energy Efficiency Project, MN .............................................................................................                          4,330
                                                                              Built to Last Pilot Project, PA ..............................................................................................................................           2,100
                                                                              Chicago Clean Energy Retrofits Program, IL .......................................................................................................                         500
                                                                              Cogency Power Solar Project, CO .........................................................................................................................                5,000
                                                                              Community Ductless Heat Pump Co–Op, OR ......................................................................................................                              301
                                                                              Community of Hope Solar Parking Structure, NM ...............................................................................................                              200
                                                                              Cully Community Solar Pilot, OR .........................................................................................................................                  344
                                                                              Derry Landfill Solar Project, NH ...........................................................................................................................               500
                                                                              Detroit/Wayne County Port Authority Hydrokinetic Energy Project, MI .................................................................                                      680
                                                                              Development of an Electric Vehicle Associate’s Degree Curriculum Standards and Educational Materials for
                                                                                 Automotive Educators and Technicians Nationwide, WV ................................................................................                                  1,000
                                                                              District Energy Construction, VT ..........................................................................................................................              5,166




amozie on DSK123TN23PROD with REPORTS
                                                                              DWCPA Solar Energy Project, MI ..........................................................................................................................                  200




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272            PO 00000             Frm 00090              Fmt 6604            Sfmt 6602            U:\SR036.XXX                 SR036
                                                                                                                                                                         91
                                                                                                                   ENERGY EFFICIENCY AND RENEWABLE ENERGY—Continued
                                                                                                                                                         [In thousands of dollars]

                                                                                                                                                      Project Name                                                                                 Recommendation

                                                                              Electric Future for America’s Rural Mobility Stakeholders (E–FARMS), OR ........................................................                                             1,500
                                                                              Electrical Substation for Garrison Oak Business and Technology Park, DE .......................................................                                              5,000
                                                                              Energy Improvements for Rhode Island Schools, RI ...........................................................................................                                 5,000
                                                                              Enhanced Biogas Collection and Energy Recovery Project, RI ............................................................................                                      2,900
                                                                              Evanston Accessible Solar Program, IL ...............................................................................................................                          500
                                                                              Expanding Solar Research and Generation for a Brighter Energy Future, VT ....................................................                                                  150
                                                                              Fuel for Seniors: Energy Efficiency, CT ................................................................................................................                       288
                                                                              Grid Resilience and Equity in the Energy Transition, MA ...................................................................................                                    995
                                                                              Hanover LED Streetlight Conversion, NH .............................................................................................................                           271
                                                                              Heartland Green Energy and Manufacturing Valley Initiative, OH ......................................................................                                          500
                                                                              Heat Recovery System, AK ...................................................................................................................................                   659
                                                                              Hybrid Solar Testing Platform for Cold Weather Climates, VT ...........................................................................                                      4,000
                                                                              Kauai North Shore Energy Resiliency Project, HI .................................................................................................                            1,000
                                                                              Kivalina Biomass Reactor, AK .............................................................................................................................                     100
                                                                              Klickitat Valley Health Central Utility Plant Modernization, WA .........................................................................                                    2,500
                                                                              Makushin Geothermal Project, AK ........................................................................................................................                     2,500
                                                                              Marquette Affordable Solar Clean Energy Planning Grant, MI ...........................................................................                                         100
                                                                              Microgrid Integration with Biomass Gasification as a Pathway to Hydrogen Production, NY ...........................                                                          1,000
                                                                              Municipal Building Upgrades, NY ........................................................................................................................                       303
                                                                              New Jersey Green Hydrogen Demonstration Project, NJ .......................................................................................                                  3,840
                                                                              Newport Town Office Energy Improvements, NH .................................................................................................                                  250
                                                                              Northeast Kingdom Home Weatherization, VT .....................................................................................................                                500
                                                                              Off–Grid residential solar project on the Navajo Nation, NM .............................................................................                                    1,000
                                                                              Overland Industrial park Solar Community Project, OH ......................................................................................                                  1,500
                                                                              Oyster River Resiliency Project, NH .....................................................................................................................                    1,150
                                                                              Reducing Inequity in Access to Solar Power, DE ................................................................................................                              2,000
                                                                              Rio Arriba County Energy Efficient Vehicle & Solar Charging Stations, NM ......................................................                                              1,000
                                                                              Salisbury Square Redevelopment: Achieving Home Affordability and Energy Resilience via a Microgrid, VT ...                                                                     750
                                                                              San Juan College Clean Hydrogen Workforce Development Program, NM ..........................................................                                                   500
                                                                              San Juan College Electric Vehicle Technician Certification Program, NM ..........................................................                                               50
                                                                              Solar Testbed, WV ................................................................................................................................................           1,900
                                                                              Sustainable Energy in Schools and Public Buildings, VT ...................................................................................                                   1,000
                                                                              Tacoma Public Utilities EV charging program, WA .............................................................................................                                1,000
                                                                              Thermal Energy Storage to Support Renewable Energy Deployment, VT ............................................................                                               5,000
                                                                              Twin Lakes Reservoir Floating Solar Study, OH ..................................................................................................                               500
                                                                              Updated Renewable Energy Development Feasibility Study by the Pueblo of Zia, NM ......................................                                                         250
                                                                              Utility Upgrades for the Bedford Landfill Solar Project, NH ...............................................................................                                    500
                                                                              Vermont Electrification and Clean Energy Deployment, VT .................................................................................                                    1,000
                                                                              WMU Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology, MI .......                                                                   350
                                                                              Wood-fiber Insulated Panels for Modular Construction and Retrofit Applications/Energy Efficient Community
                                                                                 Cross-Laminated Timber Demonstration Project, ME .....................................................................................                                    2,000


                                                                                   CYBERSECURITY, ENERGY SECURITY, AND EMERGENCY RESPONSE
                                                                              Appropriations, 2021 .............................................................................                                                             $156,000,000
                                                                              Budget estimate, 2022 ...........................................................................                                                               201,000,000
                                                                              Committee recommendation .................................................................                                                                      177,000,000
                                                                                 The Committee recommends $177,000,000 for the Office of Cy-
                                                                              bersecurity, Energy Security, and Emergency Response. Within
                                                                              available funds, the Committee recommends $14,000,000 for pro-
                                                                              gram direction.
                                                                                 Additional direction related to Department-wide crosscutting ini-
                                                                              tiatives is provided under the heading Crosscutting Initiatives in
                                                                              the front matter of the Department of Energy.
                                                                                 CESER was established in 2018 to protect the U.S. from emerg-
                                                                              ing cyber threats and improve our energy security and infrastruc-
                                                                              ture. To date, the program has received $461,000,000 in annual ap-
                                                                              propriations and undergone several internal reorganizations. In




amozie on DSK123TN23PROD with REPORTS
                                                                              2019, the Inspector General Office was notified about several com-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021     Jkt 045272             PO 00000              Frm 00091              Fmt 6604            Sfmt 6602             U:\SR036.XXX                  SR036
                                                                                                                              92

                                                                              plaints about lack of internal control policies and allegations about
                                                                              improper use of funds. The Committee is alarmed about the Inspec-
                                                                              tor General’s findings and directs CESER to follow through with
                                                                              addressing their recommendations expeditiously. Further, the Com-
                                                                              mittee is concerned about the longstanding lack of clarity on the
                                                                              Department’s cyber research and development responsibilities and
                                                                              directs CESER to coordinate with the OE and relevant applied en-
                                                                              ergy offices in clearly defining these program activities. Finally, the
                                                                              Department is directed to include an itemization of funding levels
                                                                              below the control point in future budget submissions and provide
                                                                              the Committee quarterly updates on the requests outlined above.
                                                                                 Risk Management Technology and Tools.—The Committee rec-
                                                                              ommends $112,000,000 for Risk Management Technology Tools.
                                                                              Within available funds, the Committee recommends $5,000,000 for
                                                                              Consequence-driven Cyber-informed Engineering. Within available
                                                                              funding, the Committee recommends research funds for univer-
                                                                              sities to develop scalable cyber-physical platforms for resilient and
                                                                              secure electric power systems that are flexible, modular, self-heal-
                                                                              ing, and autonomous. This activity shall be conducted in coordina-
                                                                              tion with OE. The recommendation provides not less than
                                                                              $5,000,000 to conduct a demonstration program of innovative tech-
                                                                              nologies, such as technologies for monitoring vegetation manage-
                                                                              ment to improve grid resiliency from wildfires. The Committee sup-
                                                                              ports extension of cyber-risk information sharing tools to close re-
                                                                              maining vulnerabilities in the distribution and transmission sys-
                                                                              tem. The Committee encourages the Department to continue exist-
                                                                              ing work within ongoing programs and to invest in research ad-
                                                                              dressing power system vulnerabilities in supply chain and life cycle
                                                                              management for critical power system components and advanced
                                                                              adaptive defensive methods for grid control systems. The Com-
                                                                              mittee supports Departmental initiatives focused on cybersecurity
                                                                              risk information-sharing and secure data anonymization and anal-
                                                                              ysis for both operational and information technology components of
                                                                              equipment commonly utilized in both the bulk power system and
                                                                              distribution systems. The Department is encouraged to prioritize
                                                                              enrolling under-resourced electric utilities in such programs, par-
                                                                              ticularly rural electric cooperatives and municipally-owned entities.
                                                                                 Response and Restoration.—The Committee recommends
                                                                              $23,000,000 for Response and Restoration. The Committee places a
                                                                              high priority on ensuring the protection of the electric grid against
                                                                              cyberattacks and extreme weather events. The Response and Res-
                                                                              toration program coordinates a national effort to secure the U.S.
                                                                              energy infrastructure against all hazards, reduce impacts from dis-
                                                                              ruptive events, and assist industry with restoration efforts. The
                                                                              program delivers a range of capabilities including energy sector
                                                                              emergency response and recovery, including emergency response of
                                                                              a cyber nature; near-real-time situational awareness and informa-
                                                                              tion sharing about the status of the energy systems to improve risk
                                                                              management; and analysis of evolving threats and hazards to en-
                                                                              ergy infrastructure.
                                                                                 Information Sharing, Partnerships, and Exercises.—The Informa-
                                                                              tion Sharing, Partnerships, and Exercises program supports energy
                                                                              sector security and resilience through coordination with govern-




amozie on DSK123TN23PROD with REPORTS
                                                                              ment and industry partners. This program provides technical as-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00092   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                                                93

                                                                              sistance that incorporates exercises to strengthen Federal, regional,
                                                                              state, tribal, and territorial abilities to work together to prepare for
                                                                              and mitigate the effects of an energy sector emergency and focuses
                                                                              on training the next generation workforce on energy sector risks.
                                                                                Congressionally Directed Spending.—The Committee rec-
                                                                              ommends $5,000,000 for the following list of projects that provide
                                                                              for research, development, and demonstration for CESER activities
                                                                              or programs. The Committee reminds recipients that statutory cost
                                                                              sharing requirements may apply to these projects.
                                                                                       CONGRESSIONALLY DIRECTED SPENDING FOR CYBERSECURITY, ENERGY SECURITY, AND
                                                                                                             EMERGENCY RESPONSE PROJECTS
                                                                                                                                                  [In thousands of dollars]

                                                                                                                                               Project Name                                                                         Recommendation

                                                                              Emerging Threat Information Sharing and Analysis Center, University of Arkansas Little Rock, AR ................                                              1,000
                                                                              Oakland University Cybersecurity Center, MI .......................................................................................................           2,000
                                                                              Virtual Cybersecurity Training Simulator, MA ......................................................................................................           2,000

                                                                                                                                                    ELECTRICITY

                                                                              Appropriations, 2021 .............................................................................                                               $211,720,000
                                                                              Budget estimate, 2022 ...........................................................................                                                 327,000,000
                                                                              Committee recommendation .................................................................                                                        303,000,000
                                                                                 The Committee recommends $303,000,000 for the Office of Elec-
                                                                              tricity. Within available funds, the Committee recommends
                                                                              $20,000,000 for program direction.
                                                                                 The Department is directed to include an itemization of funding
                                                                              levels below the control point in future budget submissions. Addi-
                                                                              tional direction related to Department-wide crosscutting initiatives
                                                                              is provided under the heading Crosscutting Initiatives in the front
                                                                              matter of the Department of Energy.
                                                                                                             TRANSMISSION RELIABILITY AND RESILIENCE

                                                                                The Committee recommends $30,000,000 for Transmission Reli-
                                                                              ability and Resilience.
                                                                                The Committee supports continued investment in advanced grid
                                                                              modeling algorithms and tool development to ensure resilient grid
                                                                              controls and protection systems that meet the challenges of the
                                                                              emerging smart grid.
                                                                                In fiscal year 2021, Congress directed the Department to conduct
                                                                              a case study on regional, wide-spread deployment of dynamic line
                                                                              rating technologies to assess the potential benefits and costs. The
                                                                              Committee is still awaiting this case study and directs the Depart-
                                                                              ment to provide the report immediately.
                                                                                In fiscal year 2021, Congress directed the Department to provide
                                                                              a report on ways to maximize utilization of the existing electricity
                                                                              delivery system by enabling dynamic line ratings, dynamically con-
                                                                              trolling the flow of electricity, and optimizing electricity delivery
                                                                              system topology. The Committee is still awaiting this report and di-
                                                                              rects the Department to provide the report immediately.
                                                                                In fiscal year 2021, Congress directed the Department to provide
                                                                              a report summarizing the results of a 12-month non-contact sensor
                                                                              monitory study. The Committee is still awaiting this report and di-




amozie on DSK123TN23PROD with REPORTS
                                                                              rects the Department to provide the report immediately.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021    Jkt 045272           PO 00000            Frm 00093            Fmt 6604          Sfmt 6602           U:\SR036.XXX               SR036
                                                                                                                               94

                                                                                The Committee encourages the Department to prioritize funding
                                                                              to incorporate and expand big data analytics capabilities into the
                                                                              pre-operational development, assessment, and demonstration of
                                                                              transmission system situational awareness technologies.
                                                                                           ENERGY DELIVERY GRID OPERATIONS TECHNOLOGY
                                                                                 Within available funds, the Committee recommends $5,000,000
                                                                              to support research on Silicon Carbide semiconductors.
                                                                                 Within available funds, the Committee recommends $10,000,000
                                                                              for the DarkNet project to explore opportunities for getting the na-
                                                                              tion’s critical infrastructure off the Internet and shielding the na-
                                                                              tion’s electricity infrastructure from disruptive cyber penetration,
                                                                              including expansion of the communications network architecture
                                                                              and development of cutting-edge networking technologies.
                                                                                                           RESILIENT DISTRIBUTION SYSTEMS

                                                                                 The Committee recommends $50,000,000 for Resilient Distribu-
                                                                              tion Systems.
                                                                                 The Committee directs that funds recommended for OE shall
                                                                              focus on identifying and addressing technical and regulatory bar-
                                                                              riers impeding grid integration of distributed energy systems to re-
                                                                              duce energy costs and improve the resiliency and reliability of the
                                                                              electric grid.
                                                                                 The Committee directs the Department to focus on identifying
                                                                              and addressing technical and regulatory barriers impeding grid in-
                                                                              tegration of distributed energy systems to reduce energy costs and
                                                                              improve the resiliency and reliability of the electric grid.
                                                                                 The Committee supports advanced control concepts and open test
                                                                              beds for new distribution control tools for enhanced distribution
                                                                              system resilience.
                                                                                 Within available funds, the Committee directs the Department to
                                                                              continue efforts to support the integration of sensors into the na-
                                                                              tion’s electric distribution systems, fundamental research and field
                                                                              validation of microgrid controllers and systems, and transactive en-
                                                                              ergy concepts, including studies and evaluations of energy usage
                                                                              behavior in response to price signals. The Committee places a high
                                                                              priority on addressing the challenges facing the electric power grid
                                                                              by developing the innovative technologies, tools, and techniques to
                                                                              modernize the distribution portion of the electricity delivery sys-
                                                                              tem. Resilient Distribution Systems pursue strategic investments
                                                                              to improve reliability, resilience, outage, recovery, and operational
                                                                              efficiency, building upon previous and ongoing grid modernization
                                                                              efforts. In addition to emerging fuel technologies for distributed
                                                                              grids, the Committee directs that fuels commonly available across
                                                                              the United States, such as propane and other diesel alternatives,
                                                                              be evaluated.
                                                                                 The recommendation provides not less than $10,000,000 for dem-
                                                                              onstration projects with the Grid Sensors and Sensor Analytics pro-
                                                                              gram. The demonstration activities may focus on utilizing data
                                                                              from advanced sensors that are deployed on existing transmission
                                                                              and distribution lines to predict or detect vegetation contact to
                                                                              mitigate wildfires and wildfire impacts. Further, the demonstration




amozie on DSK123TN23PROD with REPORTS
                                                                              activities may focus on measuring the condition of utility poles in




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000    Frm 00094   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              95

                                                                              terms of their position, impacts, the presence of high temperatures,
                                                                              and measuring the condition of conductors at the attachment
                                                                              points to utility poles in terms of their position and impacts. Data
                                                                              from the sensors shall be utilized to provide useful and immediate
                                                                              analytics to improve the safety of the general public and improve
                                                                              electrical distribution network performance indices. The dem-
                                                                              onstration activities may also include a focus on utilizing data from
                                                                              distribution utilities that have deployed advanced metering infra-
                                                                              structure.
                                                                                Within available funds, the Committee recommends up to
                                                                              $10,000,000 for coordinated research and development of microgrid-
                                                                              related technologies, with a focus on underserved and Indigenous
                                                                              communities. The research shall focus on development and deploy-
                                                                              ment of advanced microgrid-enabling technologies, including re-
                                                                              newable generation and storage systems, multi-nodal small-scale
                                                                              high-voltage direct current, advanced demand-side management
                                                                              strategies, and microgrid control systems. The research will aim to
                                                                              provide replicable microgrid solutions to address the broad array of
                                                                              challenges facing underserved and Indigenous communities in re-
                                                                              mote and islanded regions throughout the United States.
                                                                                                                   ENERGY STORAGE

                                                                                 The Committee recommends $139,000,000 for Energy Storage,
                                                                              including $47,000,000 for the Grid Storage Launchpad.
                                                                                 The Committee urges the Department to continue furthering co-
                                                                              ordination between OE, the Office of Science, EERE and other De-
                                                                              partment offices to achieve commercially viable grid-scale storage
                                                                              with the most efficient use of taxpayer dollars.
                                                                                 The recommendation provides not less than $20,000,000 for a
                                                                              competitive pilot demonstration grant program, as authorized in
                                                                              section 3201 of the Energy Act of 2020, for energy storage projects
                                                                              that are wholly U.S.-made, sourced, and supplied. The Department
                                                                              is directed to include large scale commercial development and de-
                                                                              ployment of long cycle life, lithium-grid scale batteries and their
                                                                              components.
                                                                                 The Committee encourages the Department to allocate resources
                                                                              to provide training and technical assistance to firefighters and code
                                                                              inspectors on battery storage, such as through scenario-based in-
                                                                              person or online training.
                                                                                 To continue and further advance the development and dem-
                                                                              onstration of grid-scale battery energy storage projects with the
                                                                              funds provided, the Committee directs the Secretary to provide
                                                                              $5,000,000 to continue a battery storage demonstration project that
                                                                              is located in areas where grid capacity constraints result in curtail-
                                                                              ment of renewable generation; improve grid resilience for a public
                                                                              utility that is regularly affected by weather-related natural disas-
                                                                              ters; and provide rate reduction and renewable energy benefits to
                                                                              businesses, farms, and residents in an economically-stressed rural
                                                                              areas. Direct storage from solar generation may also be incor-
                                                                              porated.
                                                                                                                         CYBER R&D

                                                                                Within available funds, the Committee recommends $5,000,000




amozie on DSK123TN23PROD with REPORTS
                                                                              for university-based research and development of scalable cyber-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00095   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              96

                                                                              physical platforms for hyper-resilient and secure electric power sys-
                                                                              tems that are flexible, modular, self-healing, and autonomous. This
                                                                              activity shall be conducted in coordination with CESER.
                                                                                        TRANSFORMER RESILIENCE AND ADVANCED COMPONENTS

                                                                                 The Committee recommends $10,000,000 for Transformer Resil-
                                                                              ience and Advanced Components.
                                                                                 Within available funds, the Committee directs the Department to
                                                                              continue to support research and development for advanced compo-
                                                                              nents and grid materials for low-cost power flow control devices, in-
                                                                              cluding both solid-state and hybrid concepts that use power elec-
                                                                              tronics to control electromagnetic devices and enable improved con-
                                                                              trollability, flexibility, and resiliency.
                                                                                 The recommendation provides up to $2,500,000 to further assess
                                                                              composite utility poles in controlled and field tests. In fiscal year
                                                                              2021, Congress directed the Department to submit to the Com-
                                                                              mittee a report that assesses the performance of composite poles.
                                                                              The Committee is still awaiting this report and directs the Depart-
                                                                              ment to provide the report immediately.
                                                                                 Within available funds, the Department is encouraged to con-
                                                                              tinue to support research and development for advanced compo-
                                                                              nents and grid materials for low-cost power flow control devices, in-
                                                                              cluding both solid-state and hybrid concepts that use power elec-
                                                                              tronics to control electromagnetic devices and enable improved con-
                                                                              trollability, flexibility, and resiliency. Because there are limited
                                                                              viable alternatives to Sulfur Hexafluoride [SF6] in power genera-
                                                                              tion and transmission equipment above 72kV, the Department is
                                                                              encouraged to support research and development to advance safe
                                                                              and effective capture and reuse technologies for the use of SF6 in
                                                                              components like circuit breakers. Below 72kV power generation
                                                                              and distribution equipment is fully capable of being designed and
                                                                              manufactured without SF6 therefore, the Department is directed to
                                                                              support research and development to advance safe and effective al-
                                                                              ternatives to SF6, including in circuit breakers, reclosers,
                                                                              sectionalizers, load break switches, switchgear and gas insulated
                                                                              lines.
                                                                                        TRANSMISSION PERMITTING AND TECHNICAL ASSISTANCE

                                                                                 Within available funds, the Committee directs OE to collaborate
                                                                              with and provide technical assistance to interested states to ensure
                                                                              state energy officials and state regulatory officials have access to
                                                                              grid, economic, and emissions modeling related to multi-state
                                                                              wholesale market design. In addition, states shall be provided mar-
                                                                              ket governance, planning and policy, and regulatory development
                                                                              assistance related to the formation, expansion, or improvement of
                                                                              regional transmission organizations. The Committee believes this
                                                                              effort should include studying the benefits of interstate sharing of
                                                                              electric resources to provide reliable and affordable service, plan-
                                                                              ning for significant additions of new variable electric resources,
                                                                              major new grid demands presented by state or Federal electrifica-
                                                                              tion and climate policies, and considering system and fuel inter-
                                                                              dependencies that create emergency conditions during extreme




amozie on DSK123TN23PROD with REPORTS
                                                                              weather events.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00096   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                                            97

                                                                                 Congressionally Directed Spending.—The Committee rec-
                                                                              ommends $2,850,000 for the following list of projects that provide
                                                                              for research, development, and demonstration for Electricity activi-
                                                                              ties or programs. The Committee reminds recipients that statutory
                                                                              cost sharing requirements may apply to these projects.
                                                                                                      CONGRESSIONALLY DIRECTED SPENDING FOR ELECTRICITY PROJECTS
                                                                                                                                               [In thousands of dollars]

                                                                                                                                            Project Name                                                                     Recommendation

                                                                              Cuyahoga County Utility Microgrid Design Project, OH .......................................................................................             300
                                                                              Electrical transmission and distribution infrastructure for PUD No 1 of Lewis County, WA .............................                                 2,500
                                                                              Village of Old Brookville Village Hall expansion: 52 kW standby backup generator, NY ..................................                                   50


                                                                                                                                          NUCLEAR ENERGY
                                                                              Appropriations, 2021 .............................................................................                                    $1,507,600,000
                                                                              Budget estimate, 2022 ...........................................................................                                      1,850,500,000
                                                                              Committee recommendation .................................................................                                             1,590,800,000
                                                                                 The Committee recommends $1,590,800,000 for Nuclear Energy.
                                                                              Within available funds, the Committee recommends $85,000,000
                                                                              for program direction. The Committee’s recommendation prioritizes
                                                                              funding for programs, projects, and activities that will ensure a
                                                                              strong future for nuclear power in the United States.
                                                                                 Nuclear Energy provides nearly one-fifth of our Nation’s elec-
                                                                              tricity, and nearly 60 percent of our carbon free electricity. Ad-
                                                                              vanced nuclear technologies hold promising potential for reliable,
                                                                              safe, emission-free energy. The Department is encouraged to
                                                                              prioritize funds for public-private partnerships to demonstrate ad-
                                                                              vanced reactor designs and fuel types by the late 2020s, including
                                                                              through the Advanced Reactor Demonstration and Accident Toler-
                                                                              ant Fuels Programs.
                                                                                 While the Committee supports nuclear energy research and de-
                                                                              velopment, it recognizes that the accumulation of spent nuclear
                                                                              fuel presents a challenge to communities accepting new plants. The
                                                                              Committee also continues to strongly support the recommendations
                                                                              of the Blue Ribbon Commission on America’s Nuclear Future and
                                                                              believes that near-term action is needed to address the accumu-
                                                                              lating inventory of spent nuclear fuel. The Committee supports con-
                                                                              tinued funding for consolidation of spent nuclear fuel from around
                                                                              the United States to one or more interim central storage facilities.
                                                                                 Nuclear Energy University Program [NEUP].—Since 2009, the
                                                                              Department has allocated up to 20 percent of funds appropriated
                                                                              to Nuclear Energy Research and Development programs to fund
                                                                              university-led R&D and university infrastructure projects through
                                                                              an open, competitive solicitation process using formally certified
                                                                              peer reviewers. The Committee is concerned that the requirements
                                                                              in section 954(a)(6) of the Energy Policy Act of 2005, as amended,
                                                                              are unnecessarily constraining the implementation of the budget
                                                                              that develops advanced nuclear fuels and technologies. The Depart-
                                                                              ment is directed to provide to the Committee, not later than 180
                                                                              days after enactment of this act, a plan to address these concerns,
                                                                              as well as an implementation plan for improvements recommended
                                                                              by the Nuclear Engineering Department Heads Organization. Fur-




amozie on DSK123TN23PROD with REPORTS
                                                                              ther, the Department is directed to provide to the Committee quar-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021    Jkt 045272          PO 00000           Frm 00097          Fmt 6604          Sfmt 6602          U:\SR036.XXX              SR036
                                                                                                                              98

                                                                              terly briefings on the status of NEUP and the university work
                                                                              being funded.
                                                                                Integrated University Program.—The Committee recommends
                                                                              $6,000,000 for the Integrated University Program. The Committee
                                                                              notes the importance of this program in developing highly qualified
                                                                              nuclear specialists to meet national needs.
                                                                                                   NUCLEAR ENERGY ENABLING TECHNOLOGY

                                                                                 The Committee recommends $100,000,000 for Nuclear Energy
                                                                              Enabling Technology.
                                                                                 Within Nuclear Energy Enabling Technology, the Committee rec-
                                                                              ommends an additional $3,000,000 to complete the preliminary en-
                                                                              gineering and design of a secure, separate, and shielded beamline
                                                                              at the NSLS II at Brookhaven National Laboratory to examine ra-
                                                                              dioactive materials. Currently, there is no U.S. facility dedicated to
                                                                              the study of radioactive materials with the high spatial and tem-
                                                                              poral resolution, superb chemical sensitivity, and unique capabili-
                                                                              ties offered by the NSLS II. This beamline shall complement and
                                                                              be compatible with irradiation tests and infrastructure for mate-
                                                                              rials characterization and sample preparation at Idaho National
                                                                              Laboratory [INL]. In conjunction with the infrastructure and capa-
                                                                              bilities at INL, the information on materials in radiation environ-
                                                                              ments derived from this beamline will be used to improve the reli-
                                                                              ability, sustain the safety, extend the life of current reactors, and
                                                                              support development of new advanced reactors.
                                                                                 The Committee recommendation provides $10,000,000 for inte-
                                                                              grated energy systems.
                                                                                 Joint Modeling and Simulation Program.—The Committee un-
                                                                              derstands the importance of modeling and simulation for nuclear
                                                                              energy applications, and recommends $30,000,000 for the Joint
                                                                              Modeling and Simulation Program. Use and application of the
                                                                              codes and tools shall be funded by the end user, not by the Joint
                                                                              Modeling and Simulation Program.
                                                                                 New Materials Development.—The Committee recommends
                                                                              $5,000,000 for the New Materials Development program, a new
                                                                              program to strengthen the pipeline of new materials that can make
                                                                              the current fleet, as well as new advanced reactors, more resilient
                                                                              and economically competitive.
                                                                                    FUEL CYCLE RESEARCH, DEVELOPMENT, AND DEMONSTRATION

                                                                                The Committee recommends $288,650,000 for Fuel Cycle Re-
                                                                              search, Development, and Demonstration.
                                                                                To support availability of high-assay low-enriched uranium
                                                                              [HALEU] and other advanced nuclear fuels, consistent with section
                                                                              2001 of the Energy Act of 2020, the recommendation includes
                                                                              $47,000,000, including $2,000,000 for Mining, Shipping, and Trans-
                                                                              portation; $25,000,000 for Advanced Nuclear Fuel Availability; and
                                                                              not less than $20,000,000 within Material Recovery and Waste
                                                                              Form Development.
                                                                                Advanced Nuclear Fuel Availability.—The Committee supports
                                                                              establishment of an Advanced Nuclear Fuel Availability program to
                                                                              make available small quantities of HALEU in the short term and




amozie on DSK123TN23PROD with REPORTS
                                                                              supports the transition of these activities to the private sector for




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00098   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              99

                                                                              commercial HALEU production and domestic supply chain capabili-
                                                                              ties for the long term.
                                                                                 The fiscal year 2020 Act directed the Department to provide an
                                                                              evaluation on the anticipated demand for HALEU, the timing of
                                                                              that demand, and options for meeting that demand. The Committee
                                                                              is still awaiting this report. Section 2001(b)(2) of the Energy Act of
                                                                              2020 requires the Department to submit to Congress a report on
                                                                              a program to support the availability of HALEU for civilian domes-
                                                                              tic demonstration and commercial use. The Department is directed
                                                                              to submit these reports to the Committee not later than 30 days
                                                                              after enactment of this act and not less than 60 days prior to the
                                                                              obligation of more than 75 percent of these funds. The Department
                                                                              is encouraged to disburse these funds on a competitive basis as the
                                                                              Department progresses its Advanced Nuclear Fuels Availability
                                                                              program. Further, the Committee encourages the Department to
                                                                              ensure that all federally-funded transfers and shipments of ura-
                                                                              nium hexafluoride and depleted uranium hexafluoride, shall to the
                                                                              extent practicable, use American manufactured shipping cylinders
                                                                              and transportation casks.
                                                                                 Material Recovery and Waste Form Development.—The Com-
                                                                              mittee recommends $20,000,000 for Material Recovery and Waste
                                                                              Form Development, including $10,000,000 to continue work on the
                                                                              ZIRCEX process to recover Highly Enriched Uranium from used
                                                                              naval fuel or unirradiated research reactor fuel.
                                                                                 Accident     Tolerant   Fuels.—The      Committee      recommends
                                                                              $110,150,000 for development of nuclear fuels with enhanced acci-
                                                                              dent-tolerant characteristics to significantly mitigate the potential
                                                                              consequences of a nuclear accident. The Committee continues to
                                                                              place a high priority on this program and urges the Department to
                                                                              maintain focus and priority on achieving results in these efforts.
                                                                              The recommendation provides not less than $10,000,000 for further
                                                                              development of silicon carbide ceramic matrix composite fuel clad-
                                                                              ding for light water reactors. The Committee also remains con-
                                                                              cerned that funding for the industry-led portions of the Accident
                                                                              Tolerant Fuels program, and for the testing and development of
                                                                              higher-enriched and higher-burnup fuels, is not being obligated by
                                                                              the Department in a timely manner. The Department is directed
                                                                              to brief its plan to allocate and obligate funds required in this act
                                                                              and any negative schedule impacts caused by the delays in allo-
                                                                              cating or obligating funding.
                                                                                 TRISO Fuel and Graphite Qualification.—Within the funds rec-
                                                                              ommended for Tristructural Isotropic [TRISO] fuels, $10,000,000 is
                                                                              recommended to continue the transition of TRISO fuel to a mul-
                                                                              tiple-producer market, ensuring that more than one industry
                                                                              source would be available to the commercial and government mar-
                                                                              kets.
                                                                              REACTOR CONCEPTS RESEARCH, DEVELOPMENT, AND DEMONSTRATION

                                                                                The Committee recommends $232,000,000 for Reactor Concepts
                                                                              Research, Development, and Demonstration.
                                                                                Advanced Small Modular Reactor Research, Development, and
                                                                              Demonstration.—The Committee recommends $140,000,000 for on-
                                                                              going work to support regulatory development, design, and deploy-




amozie on DSK123TN23PROD with REPORTS
                                                                              ment activities.




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00099   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              100

                                                                                 Advanced Reactor Technologies.—The Committee recommends up
                                                                              to $5,000,000 for continued work on Supercritical Transformational
                                                                              Electric Power Research and Development. The Committee sup-
                                                                              ports the collaboration between the national laboratories and in-
                                                                              dustry partners to develop and validate sCO2 power conversion,
                                                                              specifically for modular micronuclear reactors by spring of 2023.
                                                                              This work will continue to be coordinated with FECM.
                                                                                 The Committee recommends $22,000,000 for MW-scale reactor
                                                                              research and development, including $9,000,000 for MARVEL. The
                                                                              Department is encouraged to move expeditiously on the solicitation
                                                                              and award of these funds and to streamline its procurement proc-
                                                                              ess to ensure implementation is not delayed. The fiscal year 2021
                                                                              Act directed the Department to submit a report outlining a strat-
                                                                              egy for siting a microreactor at an institution of higher education
                                                                              with existing infrastructure to support the reactor siting, perform
                                                                              fundamental research, test enabling technologies and cyber secu-
                                                                              rity solutions for grid integration, train the future workforce, and
                                                                              de-risk deployment for future private sector applications. The Com-
                                                                              mittee is still awaiting this case study and directs the Department
                                                                              to provide the report immediately.
                                                                                 Advanced Reactor Concepts Industry Awards.—The Advanced Re-
                                                                              actor Concepts [ARC] program provided a platform to support inno-
                                                                              vative advanced reactor designs. With the award of funds by the
                                                                              Department for its comprehensive Advanced Reactor Demonstra-
                                                                              tion program, ARC funding has become duplicative. Therefore, no
                                                                              funds are provided for awards under ARC.
                                                                                 Light Water Reactor Sustainability.—The Committee rec-
                                                                              ommends $45,000,000 for Light Water Reactor Sustainability. The
                                                                              most cost-effective way for the United States to maintain low-cost,
                                                                              carbon-free electricity is to safely extend the lives of our Nation’s
                                                                              existing nuclear reactors from 60 to 80 years. The Committee en-
                                                                              courages the Department to maximize benefits of the operating
                                                                              light water reactor fleet under the program.
                                                                                                ADVANCED REACTOR DEMONSTRATION PROGRAM

                                                                                 The Committee recommends $370,350,000 for the Advanced Re-
                                                                              actor Demonstration Program to demonstrate multiple advanced
                                                                              reactor designs.
                                                                                 The primary goal of this program is to focus government and in-
                                                                              dustry resources on actual construction of real demonstration reac-
                                                                              tors that are safe and affordable to build and operate in the near
                                                                              and mid-term. The Committee continues to believe that the only
                                                                              way the United States will regain its leadership in nuclear energy
                                                                              is to begin to deploy advanced reactors. The Department is directed
                                                                              to continue to ensure the program moves forward expeditiously and
                                                                              within original scope and budget. The Department is directed to
                                                                              continue to focus resources on partners capable of project delivery
                                                                              in the next five to seven years. The Committee encourages the De-
                                                                              partment to consider including the Milestone-Based Demonstration
                                                                              Projects approach, as authorized in section 9005 of the Energy Act
                                                                              of 2020, for existing ARDP awards.




amozie on DSK123TN23PROD with REPORTS



                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00100   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                                        101

                                                                                                                            INFRASTRUCTURE

                                                                                 INL Facilities Operations and Maintenance.—The recommenda-
                                                                              tion provides $290,000,000 for INL Facilities Operations and Main-
                                                                              tenance to support the reliability and sustainability of the Mate-
                                                                              rials and Fuels Complex and the Advanced Test Reactor.
                                                                                 ORNL Facilities Operations and Maintenance.—The Committee
                                                                              recommends $19,000,000 for the continued safe operations and
                                                                              maintenance of Oak Ridge National Laboratory’s hot cells.
                                                                                 Idaho Sitewide Safeguard and Security.—The recommendation
                                                                              provides $149,800,000 for Idaho Sitewide Safeguards and Security.
                                                                                                     FOSSIL ENERGY AND CARBON MANAGEMENT

                                                                              Appropriations, 2021 .............................................................................     $750,000,000
                                                                              Budget estimate, 2022 ...........................................................................       890,000,000
                                                                              Committee recommendation .................................................................              850,000,000
                                                                                 The Committee recommends $850,000,000 for Fossil Energy Re-
                                                                              search and Development. Within available funds, the Committee
                                                                              recommends $65,800,000 for program direction.
                                                                                 Additional direction related to Department-wide crosscutting ini-
                                                                              tiatives is provided under the heading Crosscutting Initiatives in
                                                                              the front matter of the Department of Energy.
                                                                                 The Committee supports the budget request, which refocuses
                                                                              funding toward industrial emission reduction and climate-centric
                                                                              activities focused on decarbonization. Further, the Committee is
                                                                              concerned about the cost of carbon capture, storage, and utilization
                                                                              projects and encourages the Department to prioritize Carbon Cap-
                                                                              ture Utilization and Storage [CCUS] funding on projects and re-
                                                                              search that look to reduce the cost of these technologies for com-
                                                                              mercial deployment.
                                                                                 National Carbon Capture Center.—The Committee recommends
                                                                              funding for the National Carbon Capture Center consistent with
                                                                              the cooperative agreement.
                                                                                 Industrial Decarbonization.—The Committee notes the lack of
                                                                              commercially viable carbon capture technology available for indus-
                                                                              trial manufacturers to significantly reduce emissions in a globally
                                                                              competitive manner. Further, the Committee recommendation sup-
                                                                              ports research and development on industrial decarbonization and
                                                                              catalyzing industry-government research partnerships, including
                                                                              carbon capture, utilization, and storage with an emphasis on reuse
                                                                              utilization within industry processes and materials; low-carbon
                                                                              fuels (e.g. hydrogen); transformative technology that will allow
                                                                              deep industrial decarbonization (including demonstration and de-
                                                                              ployment at scale); materials efficiency and circular economy; and
                                                                              carbon intensity definitions and labeling across key product groups.
                                                                              The Committee supports the budget request to focus on industrial
                                                                              CCUS pilot and demonstration projects.
                                                                                 Interagency Working Group on Coal and Power Plant Commu-
                                                                              nities and Economic Revitalization.—The Committee supports the
                                                                              Administration’s efforts to assist coal communities through their
                                                                              Interagency Working Group on Coal and Power Plant Communities
                                                                              and Economic Revitalization which is led by the Department. The
                                                                              Committee directs the Department to include an itemization of




amozie on DSK123TN23PROD with REPORTS
                                                                              funding for these activities in future budget submissions. Within




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272     PO 00000     Frm 00101      Fmt 6604      Sfmt 6602     U:\SR036.XXX       SR036
                                                                                                                              102

                                                                              available funds, the Committee also encourages the Department to
                                                                              allocate sufficient funds for the working group’s activities in fiscal
                                                                              year 2022.
                                                                                 Solid Oxide Fuel Cell Systems & Hydrogen.—The recommenda-
                                                                              tion provides not less than $90,000,000 for the research, develop-
                                                                              ment, and demonstration of solid oxide fuel cell systems and hydro-
                                                                              gen production. The committee recognizes the importance of ad-
                                                                              vancing solid oxide fuel cell systems, especially for distributed and
                                                                              central power generation electrolysis, combined heat and power,
                                                                              and storage applications.
                                                                                 Special Recruitment Programs and HBCUs.—The Committee
                                                                              supports the Department’s efforts to offer undergraduate, graduate,
                                                                              and post-graduate students majoring in scientific, technology, engi-
                                                                              neering, and mathematics disciplines the opportunity to learn
                                                                              about programs, policies, and research, development, demonstra-
                                                                              tion, and deployment initiatives within FECM. Further the Com-
                                                                              mittee supports the budget request increase for the University
                                                                              Training and Research, which comprises funding for University
                                                                              Coal Research, Historically Black Colleges and Universities
                                                                              [HBCUs], and other Minority Serving Institutions.
                                                                                 Ethane Study.—The Committee directs the Department to pro-
                                                                              vide a status update and expected timeline for release on their con-
                                                                              gressionally requested report on ethane production and consump-
                                                                              tion trends no later than 30 days after the enactment of this act.
                                                                                   CARBON CAPTURE UTILIZATION AND STORAGE AND POWER SYSTEMS

                                                                                 The Committee recommends $527,500,000 for CCUS and Power
                                                                              Systems.
                                                                                 CCUS is a process that captures carbon dioxide emissions from
                                                                              sources and either reuses or stores it so it will not enter the atmos-
                                                                              phere. The potential for these technologies is considerable, and the
                                                                              use of these technologies will decrease the costs for mitigating cli-
                                                                              mate change, in addition to deploying clean energy and energy effi-
                                                                              cient technologies.
                                                                                 The Department is directed to conduct CCUS activities, including
                                                                              front-end engineering and design studies, large pilot projects, and
                                                                              demonstration projects that capture and securely store commercial
                                                                              volumes of carbon dioxide from fossil energy power plants, indus-
                                                                              trial facilities, or directly from the air consistent with the objectives
                                                                              of title IV of the Energy Act of 2020.
                                                                                 The Committee supports funding for activities that promote the
                                                                              reuse of captured carbon dioxide from coal, natural gas, industrial
                                                                              facilities, direct air capture, and other sources for the production of
                                                                              fuels and other valuable products. The Committee further encour-
                                                                              ages the Department to establish and pursue a comprehensive car-
                                                                              bon sequestration and utilization effort to combine research and de-
                                                                              velopment capacity and expertise to solve the carbon sequestration
                                                                              and utilization challenge within 10 years, with the goals of improv-
                                                                              ing the economics associated with domestic energy production,
                                                                              achieving optionality in carbon management, and further reducing
                                                                              carbon dioxide emissions.
                                                                                 The Committee supports the integrated carbon and energy man-
                                                                              agement activities of the offices of NE, FECM, and EERE and col-




amozie on DSK123TN23PROD with REPORTS
                                                                              laboration on high-efficiency electrochemical conversion of fossil re-




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00102   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              103

                                                                              sources to monomers and chemicals utilizing nuclear reactor ther-
                                                                              mal energy.
                                                                                 Carbon Capture.—The recommendation provides $200,000,000
                                                                              within carbon capture. Within available funds, the Committee rec-
                                                                              ommends up to $100,000,000 to support front-end engineering and
                                                                              design studies, large pilot projects, and demonstration projects, in-
                                                                              cluding for the development of a first-of-its-kind carbon capture
                                                                              project at an existing natural gas combined cycle plant.
                                                                                 As industrial deployment of CCUS technology expands, the de-
                                                                              mand for the transportation of captured carbon oxides is antici-
                                                                              pated to increase significantly. In preparation to meet this demand,
                                                                              the Department, in collaboration with the Department of Transpor-
                                                                              tation, is directed to review existing freight transportation infra-
                                                                              structure and the capacity of the various modes of freight transpor-
                                                                              tation to provide cost-effective service. The Department is directed
                                                                              to provide to the Committee not later than 180 days after enact-
                                                                              ment of this act a report of the findings of the review. This report
                                                                              shall ensure that anticipated short- and long-term freight transpor-
                                                                              tation demand associated with the expanded industrial deployment
                                                                              of CCUS technology is met. Additionally, the report shall include
                                                                              analysis of locations where CCUS projects are likely to be located
                                                                              and where carbon sequestration or utilization is likely to occur and
                                                                              the unique aspects of those areas for freight transportation infra-
                                                                              structure. Finally, in conducting this review, the Department shall
                                                                              consult with stakeholders, including representatives from the var-
                                                                              ious modes of freight transportation.
                                                                                 Carbon Dioxide Removal.—Within available funds, the Com-
                                                                              mittee recommends $5,000,000 for research, development, and
                                                                              demonstration activities related to the indirect sequestration of car-
                                                                              bon dioxide in deep ocean waters.
                                                                                 Within available funds, the recommendation provides $5,000,000
                                                                              for a competitive solicitation for a study for the development of a
                                                                              direct air capture facility co-located with a geothermal energy re-
                                                                              source. Priority for such a grant shall be given to entities that are
                                                                              engaged in the generation of electricity from geothermal resources.
                                                                                 Carbon Utilization.—The Committee encourages research and
                                                                              development activities in the Carbon Utilization Program to sup-
                                                                              port valuable and innovative uses of captured carbon, including bi-
                                                                              ological utilization by the conversion of carbon dioxide to high-
                                                                              value products such as chemicals, plastics, building materials, cur-
                                                                              ing for cement, and the integration of carbon utilization tech-
                                                                              nologies with fossil fuel power plants, such as biological conversion
                                                                              systems. Within available funds for Carbon Utilization, not less
                                                                              than $6,000,000 for a competitive solicitation to conduct tests of
                                                                              technologies for carbon dioxide absorption integrated with algae
                                                                              systems for capturing and reusing carbon dioxide to produce useful
                                                                              fuels and chemicals, giving priority for teams with university par-
                                                                              ticipants.
                                                                                 Carbon Storage.—Within available funds, the Committee rec-
                                                                              ommends $85,000,000 for Storage Infrastructure. Within available
                                                                              funds, the recommendation provides not less than $40,000,000 for
                                                                              CarbonSAFE. Further, the Committee recognizes the successful
                                                                              work of the Regional Carbon Sequestration Partnerships (RCSPs)




amozie on DSK123TN23PROD with REPORTS
                                                                              and the important role they play in supporting the research and




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00103   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              104

                                                                              development of carbon utilization and storage. The Committee rec-
                                                                              ommends not less than $20,000,000 for the work of RCSPs.
                                                                                 The Department is encouraged to facilitate development and de-
                                                                              ployment of monitoring technologies at carbon capture utilization
                                                                              and storage projects, with considerable progress towards commer-
                                                                              cial implementation (e.g. a Class VI permit, in-hand or pending).
                                                                              Currently available seismic data with respect to carbon storage can
                                                                              take several-to-many months for processing, and there are concerns
                                                                              about the ability to identify low levels of carbon dioxide concentra-
                                                                              tions in underground storage. Technologies that promise near real-
                                                                              time results, and/or employ big data, machine learning, and artifi-
                                                                              cial intelligence are further encouraged to be given particular at-
                                                                              tention to better address issues such as leak detection, monetiza-
                                                                              tion of credits, and permit compliance.
                                                                                 In order to mitigate the detrimental effects of climate change and
                                                                              to meet net-zero goals, it is necessary to accelerate the use of meth-
                                                                              ods for carbon removal and storage, including the use and manage-
                                                                              ment of natural systems to sequester carbon and to store it perma-
                                                                              nently underground via mineralization processes. The Department
                                                                              is directed to establish a program to support research and develop-
                                                                              ment of novel, proof-of-principle carbon containment projects with
                                                                              the goal of finding and de-risking methods and locations to remove
                                                                              atmospheric carbon dioxide that are effective, safe, low cost, and
                                                                              scalable. The recommendation provides up to $10,000,000 to sup-
                                                                              port work at multiple sites, including within significant basalt for-
                                                                              mations, to pursue research, development, and deployment of car-
                                                                              bon containment technologies and proximate carbon dioxide cap-
                                                                              turing systems that also meet regional economic and ecological res-
                                                                              toration policy goals, such as catastrophic wildfire mitigation and
                                                                              job creation.
                                                                                 Advanced Energy and Hydrogen Systems.—The recommendation
                                                                              provides up to $35,000,000 for materials research and development.
                                                                              The Department is encouraged to support the Advanced
                                                                              Ultrasupercritical Program to fabricate, qualify, and develop do-
                                                                              mestic suppliers capable of producing components from high tem-
                                                                              perature materials. Further, the Department is encouraged to sup-
                                                                              port the Extreme Environments Materials Multi-Laboratory Con-
                                                                              sortium and the development of advanced ceramics under the Ma-
                                                                              terials that Withstand Harsh Environments and Extend Service
                                                                              Lifetimes. The Department is directed to support the development
                                                                              of ceramic matrix composite [CMC] materials in accordance with
                                                                              the CMC Manufacturing Roadmap and section 4005 of the Energy
                                                                              Act of 2020.
                                                                                 The Committee recognizes the significant grid resilience benefits
                                                                              that distributed-scale highly-efficient natural gas engines can pro-
                                                                              vide to the Nation’s electricity grid. The Committee encourages
                                                                              FECM to jointly issue a competitive solicitation to industry with
                                                                              OE with the goal to develop highly efficient natural gas engines to
                                                                              be used in electricity generation. Further, preference is encouraged
                                                                              to be given to projects that prioritize fast demand response and im-
                                                                              proved integration with building and institution-based micro-grid
                                                                              systems.
                                                                                 The Committee encourages the Department to continue expand-




amozie on DSK123TN23PROD with REPORTS
                                                                              ing its research and demonstration capabilities toward production,




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00104   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              105

                                                                              storage, transport and utilization of hydrogen. This work shall
                                                                              focus on net-negative carbon hydrogen production from modular
                                                                              gasification and co-gasification of mixed wastes, biomass, and tradi-
                                                                              tional feedstocks, solid oxide electrolysis cell technology develop-
                                                                              ment, carbon capture, advanced turbines, natural gas-based hydro-
                                                                              gen production, hydrogen pipeline infrastructure, and subsurface
                                                                              hydrogen storage.
                                                                                 The Committee recognizes the value in the production of carbon-
                                                                              neutral chemicals in decarbonizing the industrial sector. Therefore,
                                                                              the Committee recommends $10,000,000 for a laboratory dem-
                                                                              onstration project for carbon-neutral methanol synthesis from di-
                                                                              rect air capture and carbon-free hydrogen production.
                                                                                 The Committee encourages continued work on coal and coal bio-
                                                                              mass to both liquids and solids activities and encourages the De-
                                                                              partment to focus on research and development to improve cost and
                                                                              efficiency of coal-to-fuels technology implementation and
                                                                              polygeneration.
                                                                                 Crosscutting     Research.—The       recommendation       includes
                                                                              $1,000,000 for research, development, and commercialization of
                                                                              value-added natural gas technologies by supporting university re-
                                                                              search and pilot projects for rural economic development focusing
                                                                              on research in green fuels, solid oxide cells and modular reactors
                                                                              for natural gas upgrading, especially in smaller and more remote
                                                                              wells.
                                                                                 Minerals Sustainability.—The Mineral Sustainability subpro-
                                                                              gram will support domestic supply chain networks required for the
                                                                              economically, environmentally, and geopolitical sustainable produc-
                                                                              tion of critical minerals. The Committee remains concerned that
                                                                              the United States continues to import most of its rare earth ele-
                                                                              ments needs from overseas and believes that finding near-term and
                                                                              future domestic sources is a top national security priority.
                                                                                 Within available funds, the Committee directs the Department to
                                                                              continue its external agency activities to develop and test advanced
                                                                              separation technologies and accelerate the advancement of commer-
                                                                              cially viable technologies for the recovery of rare earth elements
                                                                              and minerals from byproduct sources. The Committee expects re-
                                                                              search to support pilot-scale and experimental activities for near-
                                                                              term applications, which encompass the extraction and recovery of
                                                                              rare earth elements and minerals. The Committee encourages the
                                                                              Department to continue investments to accelerate the advancement
                                                                              of commercially viable technologies for the recovery of rare earth
                                                                              elements and critical minerals, including from lignite. Further, the
                                                                              Committee encourages the Department to fund a more detailed as-
                                                                              sessment of lignite resources and to devise cost-effective methods
                                                                              of removing rare earths from lignite.
                                                                                 The Committee directs the Department to continue the Carbon
                                                                              Ore, Rare Earths, and Critical Minerals [CORE–CM] Program,
                                                                              from within available funds.
                                                                                 Within available funds, the Committee recommends up to
                                                                              $6,000,000 for the Department, in collaboration with the Depart-
                                                                              ment of Commerce, and U.S. Geological Survey, to pilot a research
                                                                              and development project to enhance the security and stability of
                                                                              the rare earth element supply chain. Research shall include ap-




amozie on DSK123TN23PROD with REPORTS
                                                                              proaches to mining of domestic rare earth elements that are critical




                                        VerDate Sep 11 2014   03:58 Aug 05, 2021   Jkt 045272   PO 00000   Frm 00105   Fmt 6604   Sfmt 6602   U:\SR036.XXX   SR036
                                                                                                                              106

                                                                              to U.S. technology development and manufacturing, as well as em-
                                                                              phasize environmentally responsible mining practices. The Depart-
                                                                              ment is encouraged to partner with universities in these efforts.
                                                                                 Supercritical Transformational Electric Power [STEP] Genera-
                                                                              tion.—Within available funds, the Committee supports efforts, con-
                                                                              sistent with the current cooperative agreement, to complete the
                                                                              necessary design and construction of the 10–MW pilot and to con-
                                                                              duct the necessary testing for the facility. The Committee remains
                                                                              concerned about repeated cost overruns for the project, and the De-
                                                                              partment is directed to brief the Committee prior to any change to
                                                                              scope or cost profile of the project. The recommendation provides
                                                                              additional funds for competitively awarded research and develop-
                                                                              ment activities, coordinated with NE and EERE to advance the use
                                                                              of supercritical power cycles and related research.
                                                                                                            NATURAL GAS TECHNOLOGIES

Full text truncated for size; the complete document is in the PDF above.

File and source

File
CRPT_crpt-117srpt36_crpt-117srpt36.pdf
Size
1,396,873 bytes
SHA-256
50db7f71059e08d00265fe9809ca03226f6d6291b1f4c38522281a8ab3a86369
Our copy
CRPT_crpt-117srpt36_crpt-117srpt36.pdf
Original
www.govinfo.gov
Back to top