Water Resources Development Act of 2020

Summary

Report 116-460, Part 1, dated July 24, 2020, is the Committee on Transportation and Infrastructure report on the Water Resources Development Act of 2020, submitted by DeFazio with additional views and a Congressional Budget Office cost estimate. The committee reports the bill favorably with an amendment and recommends that the bill as amended do pass. The table of contents lists Title I (General Provisions), Title II (Studies and Reports), Title III (Deauthorizations and Modifications) and Title IV (Water Resources Infrastructure). Section 102 on funding for navigation sets aside not less than 20 percent of funds for emerging harbor projects, not less than 12 percent for projects within the Great Lakes Navigation System, and 10 percent for expanded uses at donor ports.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Crpt Crpt 116Hrpt460 Crpt 116Hrpt460 Pt1
Case
Crpt Crpt 116Hrpt460 Crpt 116Hrpt460 Pt1

Cite this document

“Water Resources Development Act of 2020.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/crpt-crpt-116hrpt460-crpt-116hrpt460-pt1/, SHA-256 fa0ab1c7dbb45ca79b0185a6b211a34c95ae93784f81af2c51d5e7dd9a5370f9.

Full text

                                                                                                                                               Union Calendar No. 369
                                                                                   116TH CONGRESS                                                                                          REPT. 116–460
                                                                                                  " HOUSE OF REPRESENTATIVES                                                           !
                                                                                      2d Session                                                                                              Part 1




                                                                                             WATER RESOURCES DEVELOPMENT ACT OF 2020



                                                                                       JULY 24, 2020.—Committed to the Committee of the Whole House on the State of
                                                                                                          the Union and ordered to be printed




                                                                                             Mr. DEFAZIO, from the Committee on Transportation and
                                                                                                    Infrastructure, submitted the following


                                                                                                                                    R E P O R T
                                                                                                                                        together with

                                                                                                                               ADDITIONAL VIEWS

                                                                                                                                 [To accompany H.R. 7575]

                                                                                                      [Including cost estimate of the Congressional Budget Office]

                                                                                     The Committee on Transportation and Infrastructure, to whom
                                                                                   was referred the bill (H.R. 7575) to provide for improvements to the
                                                                                   rivers and harbors of the United States, to provide for the con-
                                                                                   servation and development of water and related resources, and for
                                                                                   other purposes, having considered the same, reports favorably
                                                                                   thereon with an amendment and recommends that the bill as
                                                                                   amended do pass.
                                                                                                                                           CONTENTS
                                                                                                                                                                                                                  Page
                                                                                   Purpose of Legislation .............................................................................................            55
                                                                                   Background and Need for Legislation ....................................................................                        55
                                                                                   Hearings ...................................................................................................................    68
                                                                                   Legislative History and Consideration ..................................................................                        69
                                                                                   Committee Votes ......................................................................................................          74
                                                                                   Committee Oversight Findings ...............................................................................                    75
                                                                                   New Budget Authority and Tax Expenditures ......................................................                                75
                                                                                   Congressional Budget Office Cost Estimate ..........................................................                            75
                                                                                   Performance Goals and Objectives .........................................................................                      76
                                                                                   Duplication of Federal Programs ............................................................................                    76
                                                                                   Congressional Earmarks, Limited Tax Benefits, and Limited Tariff Benefits ...                                                   76




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Federal Mandates Statement .................................................................................                    76
                                                                                   Preemption Clarification .........................................................................................              76
                                                                                         99–006




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006      PO 00000       Frm 00001       Fmt 6659       Sfmt 6646      E:\HR\OC\HR460P1.XXX              HR460P1
                                                                                                                                                 2
                                                                                   Advisory Committee Statement ..............................................................................                77
                                                                                   Applicability to Legislative Branch ........................................................................               77
                                                                                   Section-by-Section Analysis of the Legislation ......................................................                      77
                                                                                   Changes in Existing Law Made by the Bill, as Reported .....................................                                92
                                                                                   Additional Views ......................................................................................................   215
                                                                                       The amendment is as follows:
                                                                                       Strike all after the enacting clause and insert the following:
                                                                                   SECTION 1. SHORT TITLE; TABLE OF CONTENTS.
                                                                                     (a) SHORT TITLE.—This Act may be cited as the ‘‘Water Resources Development
                                                                                   Act of 2020’’.
                                                                                     (b) TABLE OF CONTENTS.—The table of contents for this Act is as follows:
                                                                                   Sec. 1. Short title; table of contents.
                                                                                   Sec. 2. Secretary defined.
                                                                                                                              TITLE I—GENERAL PROVISIONS
                                                                                   Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund.
                                                                                   Sec. 102. Funding for navigation.
                                                                                   Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund.
                                                                                   Sec. 104. Additional measures at donor ports and energy transfer ports.
                                                                                   Sec. 105. Assumption of maintenance of a locally preferred plan.
                                                                                   Sec. 106. Coast Guard anchorages.
                                                                                   Sec. 107. State contribution of funds for certain operation and maintenance costs.
                                                                                   Sec. 108. Inland waterway projects.
                                                                                   Sec. 109. Implementation of water resources principles and requirements.
                                                                                   Sec. 110. Resiliency planning assistance.
                                                                                   Sec. 111. Project consultation.
                                                                                   Sec. 112. Review of resiliency assessments.
                                                                                   Sec. 113. Small flood control projects.
                                                                                   Sec. 114. Conforming amendment.
                                                                                   Sec. 115. Feasibility studies; review of natural and nature-based features.
                                                                                   Sec. 116. Report on corrosion prevention activities.
                                                                                   Sec. 117. Quantification of benefits for flood risk management projects in seismic zones.
                                                                                   Sec. 118. Federal interest determination.
                                                                                   Sec. 119. Economically disadvantaged community flood protection and hurricane and storm damage reduction
                                                                                             study pilot program.
                                                                                   Sec. 120. Permanent measures to reduce emergency flood fighting needs for communities subject to repetitive
                                                                                             flooding.
                                                                                   Sec. 121. Emergency response to natural disasters.
                                                                                   Sec. 122. Study on natural infrastructure at Corps of Engineers projects.
                                                                                   Sec. 123. Review of Corps of Engineers assets.
                                                                                   Sec. 124. Sense of Congress on multipurpose projects.
                                                                                   Sec. 125. Beneficial reuse of dredged material; dredged material management plans.
                                                                                   Sec. 126. Aquatic ecosystem restoration for anadromous fish.
                                                                                   Sec. 127. Annual report to Congress.
                                                                                   Sec. 128. Harmful algal bloom demonstration program.
                                                                                   Sec. 129. Update on Invasive Species Policy Guidance.
                                                                                   Sec. 130. Report on debris removal.
                                                                                   Sec. 131. Missouri River interception-rearing complex construction.
                                                                                   Sec. 132. Cost and benefit feasibility assessment.
                                                                                   Sec. 133. Materials, services, and funds for repair, restoration, or rehabilitation of projects.
                                                                                   Sec. 134. Levee safety.
                                                                                   Sec. 135. National Dam Safety Program.
                                                                                   Sec. 136. Rehabilitation of Corps of Engineers constructed pump stations.
                                                                                   Sec. 137. Non-Federal Project Implementation Pilot Program.
                                                                                   Sec. 138. Definition of economically disadvantaged community.
                                                                                   Sec. 139. Cost sharing provisions for territories and Indian Tribes.
                                                                                   Sec. 140. Flood control and other purposes.
                                                                                   Sec. 141. Review of contracting policies.
                                                                                   Sec. 142. Buy America.
                                                                                   Sec. 143. Annual report on status of feasibility studies.
                                                                                                                             TITLE II—STUDIES AND REPORTS
                                                                                   Sec. 201. Authorization of proposed feasibility studies.
                                                                                   Sec. 202. Expedited completions.
                                                                                   Sec. 203. Feasibility study modifications.
                                                                                   Sec. 204. Selma, Alabama.
                                                                                   Sec. 205. Comprehensive study of the Sacramento River, Yolo Bypass, California.
                                                                                   Sec. 206. Lake Okeechobee regulation schedule, Florida.
                                                                                   Sec. 207. Great Lakes Coastal Resiliency Study.
                                                                                   Sec. 208. Rathbun Lake, Chariton River, Iowa.
                                                                                   Sec. 209. Report on the status of restoration in the Louisiana coastal area.
                                                                                   Sec. 210. Lower Mississippi River comprehensive study.
                                                                                   Sec. 211. Upper Mississippi River Comprehensive Plan.
                                                                                   Sec. 212. Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas, Nebraska, and Missouri.
                                                                                   Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Harbor, New Hampshire.
                                                                                   Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Oregon.
                                                                                   Sec. 215. Port Orford, Oregon.
                                                                                   Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas.
                                                                                   Sec. 217. GAO study on mitigation for water resources development projects.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Sec. 218. GAO study on application of Harbor Maintenance Trust Fund expenditures.
                                                                                   Sec. 219. GAO study on administration of environmental banks.
                                                                                   Sec. 220. Study on water supply and water conservation at water resources development projects.
                                                                                   Sec. 221. PFAS review and inventory at Corps facilities.
                                                                                   Sec. 222. Report on recreational facilities.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006     PO 00000       Frm 00002      Fmt 6659      Sfmt 6631      E:\HR\OC\HR460P1.XXX            HR460P1
                                                                                                                                           3
                                                                                                             TITLE III—DEAUTHORIZATIONS AND MODIFICATIONS
                                                                                   Sec. 301. Deauthorization of inactive projects.
                                                                                   Sec. 302. Abandoned and inactive noncoal mine restoration.
                                                                                   Sec. 303. Tribal partnership program.
                                                                                   Sec. 304. Lakes program.
                                                                                   Sec. 305. Watercraft inspection stations.
                                                                                   Sec. 306. Chesapeake Bay Environmental Restoration and Protection Program.
                                                                                   Sec. 307. Upper Mississippi River System Environmental Management Program.
                                                                                   Sec. 308. McClellan-Kerr Arkansas River Navigation System.
                                                                                   Sec. 309. Ouachita-Black River Navigation Project, Arkansas.
                                                                                   Sec. 310. Sacramento River, Glenn-Colusa, California.
                                                                                   Sec. 311. Lake Isabella, California.
                                                                                   Sec. 312. Lower San Joaquin River flood control project.
                                                                                   Sec. 313. San Diego River and Mission Bay, San Diego County, California.
                                                                                   Sec. 314. San Francisco, California, Waterfront Area.
                                                                                   Sec. 315. Western Pacific Interceptor Canal, Sacramento River, California.
                                                                                   Sec. 316. Rio Grande Environmental Management Program, Colorado, New Mexico, and Texas.
                                                                                   Sec. 317. New London Harbor Waterfront Channel, Connecticut.
                                                                                   Sec. 318. Washington Harbor, District of Columbia.
                                                                                   Sec. 319. Central Everglades, Florida.
                                                                                   Sec. 320. Miami River, Florida.
                                                                                   Sec. 321. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns River Basin, Florida.
                                                                                   Sec. 322. Calcasieu River and Pass, Louisiana.
                                                                                   Sec. 323. San Juan-Chama project; Abiquiu Dam, New Mexico.
                                                                                   Sec. 324. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut.
                                                                                   Sec. 325. Harris County, Texas.
                                                                                   Sec. 326. Cap Sante Waterway, Washington.
                                                                                   Sec. 327. Regional sediment management.
                                                                                   Sec. 328. Additional assistance for critical projects.
                                                                                   Sec. 329. Project modification authorizations.
                                                                                   Sec. 330. Application of credit.
                                                                                   Sec. 331. Project reauthorizations.
                                                                                   Sec. 332. Conveyances.
                                                                                   Sec. 333. Repeals.

                                                                                                               TITLE IV—WATER RESOURCES INFRASTRUCTURE
                                                                                   Sec. 401. Project authorizations.
                                                                                   Sec. 402. Special rules.
                                                                                   Sec. 403. Authorization of projects based on feasibility studies prepared by non-Federal interests.
                                                                                   SEC. 2. SECRETARY DEFINED.
                                                                                       In this Act, the term ‘‘Secretary’’ means the Secretary of the Army.

                                                                                                     TITLE I—GENERAL PROVISIONS
                                                                                   SEC. 101. BUDGETARY TREATMENT EXPANSION AND ADJUSTMENT FOR THE HARBOR MAIN-
                                                                                              TENANCE TRUST FUND.
                                                                                      (a) IN GENERAL.—Section 14003 of division B of the CARES Act (Public Law 116–
                                                                                   136) is amended to read as follows:
                                                                                      ‘‘SEC. 14003. Section 251(b)(2) of the Balanced Budget and Emergency Deficit
                                                                                   Control Act of 1985 (2 U.S.C. 901(b)(2)) is amended by adding at the end the fol-
                                                                                   lowing:
                                                                                                ‘‘ ‘(H) HARBOR MAINTENANCE ACTIVITIES.—If, for any fiscal year, appro-
                                                                                             priations for the Construction, Mississippi River and Tributaries, and Oper-
                                                                                             ation and Maintenance accounts of the Corps of Engineers are enacted that
                                                                                             are derived from the Harbor Maintenance Trust Fund established under
                                                                                             section 9505(a) of the Internal Revenue Code of 1986 and that the Congress
                                                                                             designates in statute as being for harbor operations and maintenance ac-
                                                                                             tivities, then the adjustment for that fiscal year shall be the total of such
                                                                                             appropriations that are derived from such Fund and designated as being for
                                                                                             harbor operations and maintenance activities.’.’’.
                                                                                      (b) EFFECTIVE DATE.—The amendment made by subsection (a) shall take effect as
                                                                                   if included in the enactment of the CARES Act (Public Law 116–136).
                                                                                   SEC. 102. FUNDING FOR NAVIGATION.
                                                                                     (a) FUNDING FOR NAVIGATION.—Section 210 of the Water Resources Development
                                                                                   Act of 1986 (33 U.S.C. 2238) is amended, in the section heading, by striking ‘‘AUTHOR-
                                                                                   IZATION OF APPROPRIATIONS’’ and inserting ‘‘FUNDING FOR NAVIGATION’’.
                                                                                     (b) OPERATION AND MAINTENANCE OF HARBOR PROJECTS.—Section 210(c) of the
                                                                                   Water Resources Development Act of 1986 (33 U.S.C. 2238(c)) is amended—
                                                                                          (1) by amending paragraph (1) to read as follows:
                                                                                          ‘‘(1) IN GENERAL.—For each fiscal year, of the funds made available under this
                                                                                       section (including funds appropriated from the Harbor Maintenance Trust




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       Fund), the Secretary shall make expenditures to pay for operation and mainte-
                                                                                       nance costs of the harbors and inland harbors referred to in subsection (a)(2),
                                                                                       using—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000     Frm 00003     Fmt 6659    Sfmt 6621    E:\HR\OC\HR460P1.XXX         HR460P1
                                                                                                                                      4
                                                                                                ‘‘(A) not less than 20 percent of such funds for emerging harbor projects,
                                                                                             to the extent there are identifiable operations and maintenance needs, in-
                                                                                             cluding eligible breakwater and jetty needs, at such harbor projects;
                                                                                                ‘‘(B) not less than 12 percent of such funds for projects that are located
                                                                                             within the Great Lakes Navigation System;
                                                                                                ‘‘(C) 10 percent of such funds for expanded uses carried out at donor
                                                                                             ports, as such term is defined in section 2106 of the Water Resources Re-
                                                                                             form and Development Act of 2014 (33 U.S.C. 2238c); and
                                                                                                ‘‘(D) any remaining funds for operation and maintenance costs of any har-
                                                                                             bor or inland harbor referred to in subsection (a)(2) based on an equitable
                                                                                             allocation of such funds among such harbors and inland harbors.’’;
                                                                                          (2) by amending paragraph (3) to read as follows:
                                                                                          ‘‘(3) ADDITIONAL USES AT EMERGING HARBORS.—
                                                                                                ‘‘(A) IN GENERAL.—In each fiscal year, the Secretary may use not more
                                                                                             than $5,000,000 of funds designated for emerging harbor projects under
                                                                                             paragraph (1)(A) to pay for the costs of up to 10 projects for maintenance
                                                                                             dredging of a marina or berthing area, in an emerging harbor, that includes
                                                                                             an area that is located adjacent to, or is accessible by, a Federal navigation
                                                                                             project, subject to subparagraphs (B) and (C) of this paragraph.
                                                                                                ‘‘(B) ELIGIBLE EMERGING HARBORS.—The Secretary may use funds as au-
                                                                                             thorized under subparagraph (A) at an emerging harbor that—
                                                                                                      ‘‘(i) supports commercial activities, including commercial fishing oper-
                                                                                                   ations, commercial fish processing operations, recreational and sport
                                                                                                   fishing, and commercial boat yards; or
                                                                                                      ‘‘(ii) supports activities of the Secretary of the department in which
                                                                                                   the Coast Guard is operating.
                                                                                                ‘‘(C) COST-SHARING REQUIREMENTS.—The Secretary shall require a non-
                                                                                             Federal interest to contribute not less than 25 percent of the costs for main-
                                                                                             tenance dredging of that portion of a maintenance dredging project de-
                                                                                             scribed in subparagraph (A) that is located outside of the Federal naviga-
                                                                                             tion project, which may be provided as an in-kind contribution, including
                                                                                             through the use of dredge equipment owned by non-Federal interest to
                                                                                             carry out such activities.’’; and
                                                                                          (3) by adding at the end the following:
                                                                                          ‘‘(5) EMERGENCY EXPENDITURES.—Nothing in this subsection prohibits the
                                                                                        Secretary from making an expenditure to pay for the operation and mainte-
                                                                                        nance costs of a specific harbor or inland harbor, including the transfer of fund-
                                                                                        ing from the operation and maintenance of a separate project, if—
                                                                                                ‘‘(A) the Secretary determines that the action is necessary to address the
                                                                                             navigation needs of a harbor or inland harbor where safe navigation has
                                                                                             been severely restricted due to an unforeseen event; and
                                                                                                ‘‘(B) the Secretary provides within 90 days of the action notice and infor-
                                                                                             mation on the need for the action to the Committee on Environment and
                                                                                             Public Works and the Committee on Appropriations of the Senate and the
                                                                                             Committee on Transportation and Infrastructure and the Committee on Ap-
                                                                                             propriations of the House of Representatives.’’.
                                                                                     (c) PRIORITIZATION.—Section 210 of the Water Resources Development Act of 1986
                                                                                   (33 U.S.C. 2238) is amended by striking subsection (d) and redesignating sub-
                                                                                   sections (e) and (f) as subsections (d) and (e), respectively.
                                                                                     (d) ASSESSMENT OF HARBORS AND INLAND HARBORS.—Section 210(d)(2)(A)(ii) of
                                                                                   the Water Resources Development Act of 1986 (as so redesignated) is amended by
                                                                                   striking ‘‘expanded uses at eligible harbors or inland harbors referred to in sub-
                                                                                   section (d)(2)’’ and inserting ‘‘uses described in paragraphs (1)(C) and (3) of sub-
                                                                                   section (c)’’.
                                                                                     (e) DEFINITIONS.—Section 210(e) of the Water Resources Development Act of 1986
                                                                                   (as so redesignated) is amended—
                                                                                          (1) by striking paragraphs (6) through (9);
                                                                                          (2) by redesignating paragraphs (3) through (5) as paragraphs (4) through (6),
                                                                                        respectively;
                                                                                          (3) by striking paragraph (2) and inserting the following:
                                                                                          ‘‘(2) EMERGING HARBOR.—The term ‘emerging harbor’ means a harbor or in-
                                                                                        land harbor referred to in subsection (a)(2) that transits less than 1,000,000
                                                                                        tons of cargo annually.
                                                                                          ‘‘(3) EMERGING HARBOR PROJECT.—The term ‘emerging harbor project’ means




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        a project that is assigned to an emerging harbor.’’; and
                                                                                          (4) in paragraph (4) (as so redesignated), by adding at the end the following:
                                                                                                ‘‘(C) An in-water improvement, if the improvement—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00004   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      5
                                                                                                    ‘‘(i) is for the seismic reinforcement of a wharf or other berthing
                                                                                                  structure, or the repair or replacement of a deteriorating wharf or other
                                                                                                  berthing structure, at a port facility;
                                                                                                    ‘‘(ii) benefits commercial navigation at the harbor; and
                                                                                                    ‘‘(iii) is located in, or adjacent to, a berth that is accessible to a Fed-
                                                                                                  eral navigation project.
                                                                                               ‘‘(D) An activity to maintain slope stability at a berth in a harbor that
                                                                                             is accessible to a Federal navigation project if such activity benefits com-
                                                                                             mercial navigation at the harbor.’’.
                                                                                   SEC. 103. ANNUAL REPORT TO CONGRESS ON THE HARBOR MAINTENANCE TRUST FUND.
                                                                                     Section 330 of the Water Resources Development Act of 1992 (26 U.S.C. 9505
                                                                                   note; 106 Stat. 4851) is amended—
                                                                                          (1) in subsection (a)—
                                                                                               (A) by striking ‘‘and annually thereafter,’’ and inserting ‘‘and annually
                                                                                            thereafter concurrent with the submission of the President’s annual budget
                                                                                            request to Congress,’’; and
                                                                                               (B) by striking ‘‘Public Works and Transportation’’ and inserting ‘‘Trans-
                                                                                            portation and Infrastructure’’; and
                                                                                          (2) in subsection (b)(1) by adding at the end the following:
                                                                                               ‘‘(D) A description of the expected expenditures from the trust fund to
                                                                                            meet the needs of navigation for the fiscal year of the budget request.’’.
                                                                                   SEC. 104. ADDITIONAL MEASURES AT DONOR PORTS AND ENERGY TRANSFER PORTS.
                                                                                     (a) DEFINITIONS.—Section 2106(a) of the Water Resources Reform and Develop-
                                                                                   ment Act of 2014 (33 U.S.C. 2238c(a)) is amended—
                                                                                         (1) in paragraph (3)(A)—
                                                                                               (A) by amending clause (ii) to read as follows:
                                                                                                     ‘‘(ii) at which the total amount of harbor maintenance taxes collected
                                                                                                  (including the estimated taxes related to domestic cargo and cruise pas-
                                                                                                  sengers) comprise not less than $15,000,000 annually of the total fund-
                                                                                                  ing of the Harbor Maintenance Trust Fund in each of the previous 3
                                                                                                  fiscal years;’’;
                                                                                               (B) in clause (iii), by inserting ‘‘(including the estimated taxes related to
                                                                                            domestic cargo and cruise passengers)’’ after ‘‘taxes collected’’; and
                                                                                               (C) in clause (iv), by striking ‘‘fiscal year 2012’’ and inserting ‘‘each of the
                                                                                            previous 3 fiscal years’’;
                                                                                         (2) in paragraph (5)(B), by striking ‘‘fiscal year 2012’’ each place it appears
                                                                                       and inserting ‘‘each of the previous 3 fiscal years’’;
                                                                                         (3) by redesignating paragraph (8) as paragraph (9) and inserting after para-
                                                                                       graph (7) the following:
                                                                                         ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—The term ‘Harbor Maintenance
                                                                                       Trust Fund’ means the Harbor Maintenance Trust Fund established by section
                                                                                       9505 of the Internal Revenue Code of 1986.’’; and
                                                                                         (4) in paragraph (9), as so redesignated—
                                                                                               (A) by amending subparagraph (B) to read as follows:
                                                                                               ‘‘(B) at which the total amount of harbor maintenance taxes collected (in-
                                                                                            cluding the estimated taxes related to domestic cargo and cruise pas-
                                                                                            sengers) comprise annually more than $5,000,000 but less than $15,000,000
                                                                                            of the total funding of the Harbor Maintenance Trust Fund in each of the
                                                                                            previous 3 fiscal years;’’;
                                                                                               (B) in subparagraph (C), by inserting ‘‘(including the estimated taxes re-
                                                                                            lated to domestic cargo and cruise passengers)’’ after ‘‘taxes collected’’; and
                                                                                               (C) in subparagraph (D), by striking ‘‘fiscal year 2012’’ and inserting
                                                                                            ‘‘each of the previous 3 fiscal years’’.
                                                                                     (b) REPORT TO CONGRESS; AUTHORIZATION OF APPROPRIATIONS.—Section 2106 of
                                                                                   the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2238c) is
                                                                                   amended—
                                                                                         (1) by striking subsection (e) and redesignating subsections (f) and (g) as sub-
                                                                                       sections (e) and (f), respectively; and
                                                                                         (2) in subsection (e), as so redesignated—
                                                                                               (A) in paragraph (1), by striking ‘‘2020’’ and inserting ‘‘2030’’; and
                                                                                               (B) by striking paragraph (3).
                                                                                   SEC. 105. ASSUMPTION OF MAINTENANCE OF A LOCALLY PREFERRED PLAN.
                                                                                      Section 204(f) of the Water Resources Development Act of 1986 (33 U.S.C. 2232(f))
                                                                                   is amended to read as follows:




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                      ‘‘(f) OPERATION AND MAINTENANCE.—
                                                                                            ‘‘(1) ASSUMPTION OF MAINTENANCE.—Whenever a non-Federal interest carries
                                                                                          out improvements to a federally authorized harbor or inland harbor, the Sec-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00005   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      6
                                                                                        retary shall be responsible for operation and maintenance in accordance with
                                                                                        section 101(b) if—
                                                                                                ‘‘(A) before construction of the improvements—
                                                                                                      ‘‘(i) the Secretary determines that the improvements are feasible and
                                                                                                   consistent with the purposes of this title; and
                                                                                                      ‘‘(ii) the Secretary and the non-Federal interest execute a written
                                                                                                   agreement relating to operation and maintenance of the improvements;
                                                                                                ‘‘(B) the Secretary certifies that the project or separable element of the
                                                                                             project is constructed in accordance with applicable permits and appro-
                                                                                             priate engineering and design standards; and
                                                                                                ‘‘(C) the Secretary does not find that the project or separable element is
                                                                                             no longer feasible.
                                                                                          ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN THE COSTS OF A LOCALLY PRE-
                                                                                        FERRED PLAN.—In the case of improvements determined by the Secretary pursu-
                                                                                        ant to paragraph (1)(A)(i) to deviate from the national economic development
                                                                                        plan, the Secretary shall be responsible for all operation and maintenance costs
                                                                                        of such improvements, as described in section 101(b), including costs in excess
                                                                                        of the costs of the national economic development plan, if the Secretary deter-
                                                                                        mines that the improvements satisfy the requirements of paragraph (1).’’.
                                                                                   SEC. 106. COAST GUARD ANCHORAGES.
                                                                                     The Secretary is authorized to perform dredging at Federal expense within and
                                                                                   adjacent to anchorages on the Columbia River established by the Coast Guard pur-
                                                                                   suant to section 7 of the Act of March 14, 1915 (33 U.S.C. 471), to provide safe an-
                                                                                   chorage for deep draft vessels commensurate with the authorized Federal navigation
                                                                                   channel depth, including advanced maintenance.
                                                                                   SEC. 107. STATE CONTRIBUTION OF FUNDS FOR CERTAIN OPERATION AND MAINTENANCE
                                                                                              COSTS.
                                                                                      In carrying out eligible operations and maintenance activities within the Great
                                                                                   Lakes Navigation System pursuant to section 210 of the Water Resources Develop-
                                                                                   ment Act of 1986 (33 U.S.C. 2238) in a State that has implemented any additional
                                                                                   State limitation on the disposal of dredged material in the open waters of such
                                                                                   State, the Secretary may, pursuant to section 5 of the Act of June 22, 1936 (33
                                                                                   U.S.C. 701h), receive from such State, and expend, such funds as may be contrib-
                                                                                   uted by the State to cover the additional costs for operations and maintenance ac-
                                                                                   tivities for a harbor or inland harbor within such State that result from such limita-
                                                                                   tion.
                                                                                   SEC. 108. INLAND WATERWAY PROJECTS.
                                                                                     (a) IN GENERAL.—Notwithstanding section 102 of the Water Resources Develop-
                                                                                   ment Act of 1986 (33 U.S.C. 2212), 35 percent of the costs of construction of any
                                                                                   project for navigation on the inland waterways shall be paid from amounts appro-
                                                                                   priated from the Inland Waterways Trust Fund—
                                                                                          (1) during each of fiscal years 2021 through 2027; and
                                                                                          (2) for a project the construction of which is initiated during such period, in
                                                                                        each fiscal year until such construction is complete.
                                                                                     (b) PRIORITIZATION.—In selecting projects described in subsection (a) for which to
                                                                                   initiate construction during any of fiscal years 2021 through 2027, the Secretary
                                                                                   shall prioritize projects that are included in the most recent 20-year program for
                                                                                   making capital investments developed under section 302(d) of the Water Resources
                                                                                   Development Act of 1986 (33 U.S.C. 2251(d)).
                                                                                   SEC. 109. IMPLEMENTATION OF WATER RESOURCES PRINCIPLES AND REQUIREMENTS.
                                                                                     (a) IN GENERAL.—Not later than 180 days after the date of enactment of this Act,
                                                                                   the Secretary shall issue final agency-specific procedures necessary to implement
                                                                                   the principles and requirements and the interagency guidelines.
                                                                                     (b) DEVELOPMENT OF FUTURE WATER RESOURCES DEVELOPMENT PROJECTS.—The
                                                                                   procedures required by subsection (a) shall ensure that the Secretary, in the formu-
                                                                                   lation of future water resources development projects—
                                                                                          (1) develops such projects in accordance with—
                                                                                               (A) the guiding principles established by the principles and requirements;
                                                                                             and
                                                                                               (B) the national water resources planning policy established by section
                                                                                             2031(a) of the Water Resources Development Act of 2007 (42 U.S.C. 1962–
                                                                                             3(a)); and
                                                                                          (2) fully identifies and analyzes national economic development benefits, re-
                                                                                        gional economic development benefits, environmental quality benefits, and other




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        societal effects.
                                                                                     (c) REVIEW AND UPDATE.—Every 5 years, the Secretary shall review and, where
                                                                                   appropriate, revise the procedures required by subsection (a).




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00006   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      7
                                                                                     (d) PUBLIC REVIEW, NOTICE, AND COMMENT.—In issuing, reviewing, and revising
                                                                                   the procedures required by this section, the Secretary shall—
                                                                                           (1) provide notice to interested non-Federal stakeholders of the Secretary’s in-
                                                                                        tent to revise the procedures;
                                                                                           (2) provide opportunities for interested non-Federal stakeholders to engage
                                                                                        with, and provide input and recommendations to, the Secretary on the revision
                                                                                        of the procedures; and
                                                                                           (3) solicit and consider public and expert comments.
                                                                                     (e) DEFINITIONS.—In this section:
                                                                                           (1) INTERAGENCY GUIDELINES.—The term ‘‘interagency guidelines’’ means the
                                                                                        interagency guidelines contained in the document finalized by the Council on
                                                                                        Environmental Quality pursuant to section 2031 of the Water Resources Devel-
                                                                                        opment Act of 2007 (42 U.S.C. 1962–3) in December 2014, to implement the
                                                                                        principles and requirements.
                                                                                           (2) PRINCIPLES AND REQUIREMENTS.—The term ‘‘principles and requirements’’
                                                                                        means the principles and requirements contained in the document prepared by
                                                                                        the Council on Environmental Quality pursuant to section 2031 of the Water
                                                                                        Resources Development Act of 2007 (42 U.S.C. 1962–3), entitled ‘‘Principles and
                                                                                        Requirements for Federal Investments in Water Resources’’, and dated March
                                                                                        2013.
                                                                                   SEC. 110. RESILIENCY PLANNING ASSISTANCE.
                                                                                      (a) IN GENERAL.—Section 206(a) of the Flood Control Act of 1960 (33 U.S.C.
                                                                                   709a(a)) is amended by inserting ‘‘, to avoid repetitive flooding impacts, to antici-
                                                                                   pate, prepare, and adapt to changing climatic conditions and extreme weather
                                                                                   events, and to withstand, respond to, and recover rapidly from disruption due to the
                                                                                   flood hazards’’ after ‘‘in planning to ameliorate the flood hazard’’.
                                                                                      (b) PRIORITIZING FLOOD RISK RESILIENCY TECHNICAL ASSISTANCE FOR ECONOMI-
                                                                                   CALLY DISADVANTAGED COMMUNITIES.—In carrying out section 206 of the Flood Con-
                                                                                   trol Act of 1960 (33 U.S.C. 709a), the Secretary shall prioritize the provision of tech-
                                                                                   nical assistance to support flood risk resiliency planning efforts of an economically
                                                                                   disadvantaged community.
                                                                                   SEC. 111. PROJECT CONSULTATION.
                                                                                     (a) REPORTS REQUIRED.—Not later than 180 days after the date of enactment of
                                                                                   this Act, the Secretary shall submit the following reports:
                                                                                          (1) The report required under section 1214 of the Water Resources Develop-
                                                                                        ment Act of 2018 (132 Stat. 3809).
                                                                                          (2) The report required under section 1120(a)(3) of the Water Resources De-
                                                                                        velopment Act of 2016 (130 Stat. 1643).
                                                                                     (b) CONSULTATION.—
                                                                                          (1) AGENCIES AND TRIBES.—The Secretary shall ensure that all covered com-
                                                                                        munity consultation policies, regulations, and guidance of the Corps of Engi-
                                                                                        neers continue to be implemented, and that consultations with Federal and
                                                                                        State agencies and Indian Tribes required for a water resources development
                                                                                        project are carried out.
                                                                                          (2) COMMUNITIES.—The Secretary shall ensure that any covered communities,
                                                                                        including such communities identified in the reports submitted under sub-
                                                                                        section (a), that are found to be disproportionately or adversely affected are in-
                                                                                        cluded in consultation policies, regulations, and guidance of the Corps of Engi-
                                                                                        neers.
                                                                                          (3) PROJECT PLANNING AND CONSTRUCTION.—The Secretary shall ensure that
                                                                                        covered communities are consulted in the development of water resources devel-
                                                                                        opment project planning and construction, for the purposes of achieving envi-
                                                                                        ronmental justice and addressing any disproportionate or adverse effects on
                                                                                        such communities.
                                                                                     (c) ENVIRONMENTAL JUSTICE UPDATES.—
                                                                                          (1) IN GENERAL.—Not later than 1 year after the date of enactment of this
                                                                                        Act, the Secretary shall update any policies, regulations, and guidance of the
                                                                                        Corps of Engineers related to achieving environmental justice for covered com-
                                                                                        munities.
                                                                                          (2) RECOMMENDATIONS AND CONSULTATION.—In carrying out paragraph (1),
                                                                                        the Secretary shall—
                                                                                               (A) consult with a wide array of representatives of covered communities;
                                                                                             and
                                                                                               (B) use the recommendations from the reports submitted under sub-
                                                                                             section (a).




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     (d) COMMUNITY ENGAGEMENT.—The Secretary shall ensure that in carrying out
                                                                                   authorized water resources development projects in, and all other activities of the
                                                                                   Corps of Engineers related to, covered communities, the Corps of Engineers—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00007   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      8
                                                                                            (1) promotes the meaningful involvement of such communities in the project
                                                                                         development and implementation, enforcement efforts, and other activities of
                                                                                         the Corps of Engineers;
                                                                                            (2) provides guidance and technical assistance to such communities to in-
                                                                                         crease understanding of the project development and implementation activities,
                                                                                         regulations, and policies of the Corps of Engineers; and
                                                                                            (3) cooperates with State, Tribal, and local governments with respect to activi-
                                                                                         ties carried out pursuant to this subsection.
                                                                                      (e) TRIBAL LANDS AND CONSULTATION.—The Secretary shall ensure that in car-
                                                                                   rying out authorized water resources development projects and in all other activities
                                                                                   of the Corps of Engineers, that the Corps of Engineers—
                                                                                            (1)(A) consults with Indian Tribes specifically on any Tribal lands near or ad-
                                                                                         jacent to any activities of the Corps of Engineers, for purposes of identifying
                                                                                         lands of ancestral, cultural, or religious importance; and
                                                                                            (B) cooperates with Indian Tribes to avoid, or otherwise find alternate solu-
                                                                                         tions with respect to, such lands; and
                                                                                            (2)(A) consults with Indian Tribes specifically on any Tribal areas near or ad-
                                                                                         jacent to any activities of the Corps of Engineers, for purposes of identifying
                                                                                         lands, waters, and other resources critical to the livelihood of the Indian Tribes;
                                                                                         and
                                                                                            (B) cooperates with Indian Tribes to avoid, or otherwise find alternate solu-
                                                                                         tions with respect to, such areas.
                                                                                      (f) DEFINITIONS.—In this section:
                                                                                            (1) COMMUNITY OF COLOR.—The term ‘‘community of color’’ means a commu-
                                                                                         nity of individuals who are—
                                                                                                 (A) American Indian or Alaska Native;
                                                                                                 (B) Asian or Pacific Islander;
                                                                                                 (C) Black, not of Hispanic origin; or
                                                                                                 (D) Hispanic.
                                                                                            (2) COVERED COMMUNITY.—The term ‘‘covered community’’ means each of the
                                                                                         following:
                                                                                                 (A) A community of color.
                                                                                                 (B) An economically disadvantaged community.
                                                                                                 (C) A rural community.
                                                                                                 (D) A Tribal or indigenous community.
                                                                                            (3) STATE.—The term ‘‘State’’ means each of the several States, the District
                                                                                         of Columbia, and each of the commonwealths, territories, and possessions of the
                                                                                         United States.
                                                                                   SEC. 112. REVIEW OF RESILIENCY ASSESSMENTS.
                                                                                     (a) RESILIENCY ASSESSMENT.—
                                                                                          (1) IN GENERAL.—Not later than 180 days after the date of enactment of this
                                                                                       section, and in conjunction with the development of procedures under section
                                                                                       109 of this Act, the Secretary is directed to review, and where appropriate, re-
                                                                                       vise the existing planning guidance documents and regulations on the assess-
                                                                                       ment of the effects of sea level rise on future water resources development
                                                                                       projects to ensure that such guidance documents and regulations are based on
                                                                                       the best available, peer-reviewed science and data on the current and future ef-
                                                                                       fects of sea level rise on coastal communities.
                                                                                          (2) COORDINATION.—In carrying out this subsection, the Secretary shall—
                                                                                               (A) coordinate the review with the Engineer Research and Development
                                                                                            Center, other Federal and State agencies, and other relevant entities; and
                                                                                               (B) to the maximum extent practicable and where appropriate, utilize
                                                                                            data provided to the Secretary by such agencies.
                                                                                     (b) ASSESSMENT OF BENEFITS OF SEA LEVEL RISE RESILIENCY IN FEASIBILITY RE-
                                                                                   PORTS.—
                                                                                          (1) IN GENERAL.—Upon the request of a non-Federal interest, in carrying out
                                                                                       a feasibility study for a project for flood risk mitigation, hurricane and storm
                                                                                       damage risk reduction, or ecosystem restoration under section 905 of the Water
                                                                                       Resources Development Act of 1986 (33 U.S.C. 2282), the Secretary shall con-
                                                                                       sider whether the need for the project is predicated upon or exacerbated by con-
                                                                                       ditions related to sea level rise.
                                                                                          (2) SEA LEVEL RISE RESILIENCY BENEFITS.—To the maximum extent prac-
                                                                                       ticable, in carrying out a study pursuant to paragraph (1), the Secretary shall




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       document the potential effects of sea level rise on the project, and benefits of
                                                                                       the project relating to sea level rise, during the 50-year period after the date
                                                                                       of completion of the project.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00008   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      9
                                                                                   SEC. 113. SMALL FLOOD CONTROL PROJECTS.
                                                                                     Section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s) is amended by in-
                                                                                   serting ‘‘, and projects that use natural features or nature-based features (as those
                                                                                   terms are defined in section 1184(a) of the Water Resources Development Act of
                                                                                   2016 (33 U.S.C. 2289a(a))),’’ after ‘‘nonstructural projects’’.
                                                                                   SEC. 114. CONFORMING AMENDMENT.
                                                                                      Section 103(b) of the Water Resources Development Act of 1986 (33 U.S.C. 2213)
                                                                                   is amended—
                                                                                          (1) in the subsection heading, by striking ‘‘NONSTRUCTURAL FLOOD CONTROL
                                                                                        PROJECTS’’ and inserting ‘‘PROJECTS USING NONSTRUCTURAL, NATURAL, OR NA-
                                                                                        TURE-BASED FEATURES’’; and
                                                                                          (2) in paragraph (1)—
                                                                                               (A) by striking ‘‘nonstructural flood control measures’’ and inserting ‘‘a
                                                                                            flood risk management or hurricane and storm damage risk reduction
                                                                                            measure using a nonstructural feature, or a natural feature or nature-based
                                                                                            feature (as those terms are defined in section 1184(a) of the Water Re-
                                                                                            sources Development Act of 2016 (33 U.S.C. 2289a(a))),’’; and
                                                                                               (B) by striking ‘‘cash during construction of the project’’ and inserting
                                                                                            ‘‘cash during construction for a nonstructural feature if the costs of land,
                                                                                            easements, rights-of-way, dredged material disposal areas, and relocations
                                                                                            for such feature are estimated to exceed 35 percent’’.
                                                                                   SEC. 115. FEASIBILITY STUDIES; REVIEW OF NATURAL AND NATURE-BASED FEATURES.
                                                                                      (a) TECHNICAL CORRECTION.—Section 1149(c) of the Water Resources Development
                                                                                   Act of 2018 (33 U.S.C. 2282 note; 132 Stat. 3787) is amended by striking ‘‘natural
                                                                                   infrastructure alternatives’’ and inserting ‘‘natural feature or nature-based feature
                                                                                   alternatives (as such terms are defined in section 1184 of the Water Resources De-
                                                                                   velopment Act of 2016 (32 U.S.C. 2289a))’’.
                                                                                      (b) SUMMARY OF ANALYSIS.—To the maximum extent practicable, the Secretary
                                                                                   shall include in each feasibility report developed under section 905 of the Water Re-
                                                                                   sources Development Act of 1986 (33 U.S.C. 2282) for a project that contains a flood
                                                                                   risk management or hurricane and storm damage risk reduction element, a sum-
                                                                                   mary of the natural feature or nature-based feature alternatives that were evalu-
                                                                                   ated in the development of the feasibility report, and, if such alternatives were not
                                                                                   included in the recommended plan, an explanation of why such alternatives were
                                                                                   not included into the recommended plan.
                                                                                   SEC. 116. REPORT ON CORROSION PREVENTION ACTIVITIES.
                                                                                     Not later than 180 days after the date of enactment of this Act, the Secretary
                                                                                   shall submit to the Committee on Transportation and Infrastructure of the House
                                                                                   of Representatives and the Committee on Environment and Public Works of the
                                                                                   Senate, and make publicly available, a report that describes—
                                                                                          (1) the extent to which the Secretary has carried out section 1033 of the
                                                                                       Water Resources Reform and Development Act of 2014 (33 U.S.C. 2350);
                                                                                          (2) the extent to which the Secretary has incorporated corrosion prevention
                                                                                       activities (as defined in such section) at water resources development projects
                                                                                       constructed or maintained by the Secretary since the date of enactment of such
                                                                                       section; and
                                                                                          (3) in instances where the Secretary has not incorporated corrosion prevention
                                                                                       activities at such water resources development projects since such date, an ex-
                                                                                       planation as to why such corrosion prevention activities have not been incor-
                                                                                       porated.
                                                                                   SEC. 117. QUANTIFICATION OF BENEFITS FOR FLOOD RISK MANAGEMENT PROJECTS IN SEIS-
                                                                                              MIC ZONES.
                                                                                     (a) IN GENERAL.—Upon the request of the non-Federal interest for a flood risk
                                                                                   management project in a seismic zone, the Secretary shall quantify the seismic haz-
                                                                                   ard risk reduction benefits for the project if the non-Federal interest identifies, and
                                                                                   the Secretary approves, an acceptable methodology to quantify such benefits.
                                                                                     (b) APPLICABILITY.—The Secretary shall—
                                                                                          (1) include all associated seismic hazard risk reduction benefits approved by
                                                                                       the Secretary in the calculation of the national economic development benefit-
                                                                                       cost ratio for a flood risk management project in a seismic hazard zone for pur-
                                                                                       poses of plan formulation pursuant to section 905 of the Water Resources Devel-
                                                                                       opment Act of 1986; and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          (2) seek to maximize the combination of flood risk reduction and seismic haz-
                                                                                       ard risk reduction benefits in the formulation of the national economic develop-
                                                                                       ment alternative for such project.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00009   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      10
                                                                                   SEC. 118. FEDERAL INTEREST DETERMINATION.
                                                                                    Section 905 of the Water Resources Development Act of 1986 (33 U.S.C. 2282) is
                                                                                   amended by inserting after subsection (a) the following:
                                                                                    ‘‘(b) FEDERAL INTEREST DETERMINATION.—
                                                                                          ‘‘(1) IN GENERAL.—In preparing a feasibility report under subsection (a) for a
                                                                                       study that will benefit an economically disadvantaged community, upon request
                                                                                       by the non-Federal interest for the study, the Secretary shall first determine
                                                                                       the Federal interest in carrying out the study and the projects that may be pro-
                                                                                       posed in the study.
                                                                                          ‘‘(2) COST SHARE.—The costs of a determination under paragraph (1)—
                                                                                                ‘‘(A) shall be at Federal expense; and
                                                                                                ‘‘(B) shall not exceed $200,000.
                                                                                          ‘‘(3) DEADLINE.—A determination under paragraph (1) shall be completed by
                                                                                       not later than 120 days after the date on which funds are made available to
                                                                                       the Secretary to carry out the determination.
                                                                                          ‘‘(4) TREATMENT.—
                                                                                                ‘‘(A) TIMING.—The period during which a determination is being com-
                                                                                             pleted under paragraph (1) for a study shall not be included for purposes
                                                                                             of the deadline to complete a final feasibility report under section 1001(a)(1)
                                                                                             of the Water Resources Reform and Development Act of 2014 (33 U.S.C.
                                                                                             2282c(a)(1)).
                                                                                                ‘‘(B) COST.—The cost of a determination under paragraph (1) shall not be
                                                                                             included for purposes of the maximum Federal cost under section 1001(a)(2)
                                                                                             of the Water Resources Reform and Development Act of 2014 (33 U.S.C.
                                                                                             2282c(a)(2)).
                                                                                          ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If, based on a determination under
                                                                                       paragraph (1), the Secretary determines that a study or project is not in the
                                                                                       Federal interest because the project will not result, or is unlikely to result, in
                                                                                       a recommended plan that will produce national economic development benefits
                                                                                       greater than cost, but may result in a technically sound and environmentally
                                                                                       acceptable plan that is otherwise consistent with section 904 of the Water Re-
                                                                                       sources Development Act of 1986 (33 U.S.C. 2281), the Secretary shall issue a
                                                                                       report to the non-Federal interest with recommendations on how the non-Fed-
                                                                                       eral interest might modify the proposal such that the project could be in the
                                                                                       Federal interest and feasible.’’.
                                                                                   SEC. 119. ECONOMICALLY DISADVANTAGED COMMUNITY FLOOD PROTECTION AND HURRI-
                                                                                              CANE AND STORM DAMAGE REDUCTION STUDY PILOT PROGRAM.
                                                                                      (a) IN GENERAL.—Not later than 180 days after the date of enactment of this Act,
                                                                                   the Secretary shall establish and implement a pilot program to evaluate opportuni-
                                                                                   ties to address the flood risk management and hurricane and storm damage risk
                                                                                   reduction needs of economically disadvantaged communities.
                                                                                      (b) PARTICIPATION IN PILOT PROGRAM.—In carrying out subsection (a), the Sec-
                                                                                   retary shall—
                                                                                            (1) publish a notice in the Federal Register that requests from non-Federal
                                                                                         interests proposals for the potential feasibility study of a flood risk management
                                                                                         project or hurricane and storm damage risk reduction project for an economi-
                                                                                         cally disadvantaged community;
                                                                                            (2) upon request of a non-Federal interest for such a project, provide technical
                                                                                         assistance to such non-Federal interest in the formulation of a proposal for a
                                                                                         potential feasibility study to be submitted to the Secretary under the pilot pro-
                                                                                         gram; and
                                                                                            (3) review such proposals and select 10 feasibility studies for such projects to
                                                                                         be carried out by the Secretary, in coordination with the non-Federal interest,
                                                                                         under this pilot program.
                                                                                      (c) SELECTION CRITERIA.—In selecting a feasibility study under subsection (b)(3),
                                                                                   the Secretary shall consider whether—
                                                                                            (1) the percentage of people living in poverty in the county or counties (or
                                                                                         county-equivalent entity or entities) in which the project is located is above the
                                                                                         percentage of people living in poverty in the State, based on census bureau
                                                                                         data;
                                                                                            (2) the percentage of families with income above the poverty threshold but
                                                                                         below the average household income in the county or counties (or county-equiva-
                                                                                         lent entity or entities) in which the project is located is above the percentage
                                                                                         of the same for the State, based on census bureau data;
                                                                                            (3) the percentage of the population that identifies as belonging to a minority




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         or indigenous group in the county or counties (or county-equivalent entity or en-
                                                                                         tities) in which the project is located is above the average percentage in the
                                                                                         State, based on census bureau data; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00010   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      11
                                                                                           (4) the project is addressing flooding or hurricane or storm damage effects
                                                                                         that have a disproportionate impact on a rural community or a community of
                                                                                         color (as such term is defined in section 111 of this Act), including Tribal or in-
                                                                                         digenous peoples.
                                                                                      (d) ADMINISTRATION.—Notwithstanding the requirements of section 105(a)(1)(A) of
                                                                                   the Water Resources Development Act of 1986 (33 U.S.C. 2215), the Federal share
                                                                                   of the cost of a feasibility study carried out under the pilot program shall be 100
                                                                                   percent.
                                                                                      (e) GEOGRAPHIC DIVERSITY.—When selecting feasibility studies under subsection
                                                                                   (b)(3), the Secretary shall consider the geographic diversity among proposed
                                                                                   projects.
                                                                                      (f) STUDY REQUIREMENTS.—Feasibility studies carried out under this subsection
                                                                                   shall, to the maximum extent practical, incorporate natural features or nature-based
                                                                                   features (as such terms are defined in section 1184 of the Water Resources Develop-
                                                                                   ment Act of 2016 (33 U.S.C. 2289a)), or a combination of such features and non-
                                                                                   structural features, that avoid or reduce at least 50 percent of flood or storm dam-
                                                                                   ages in one or more of the alternatives included in the final alternatives evaluated.
                                                                                      (g) NOTIFICATION.—The Secretary shall notify the Committee on Transportation
                                                                                   and Infrastructure of the House of Representatives and the Committee on Environ-
                                                                                   ment and Public Works of the Senate of the selection of each feasibility study under
                                                                                   the pilot program.
                                                                                      (h) COMPLETION.—Upon completion of a feasibility report for a feasibility study se-
                                                                                   lected to be carried out under this section, the Secretary shall transmit the report
                                                                                   to Congress for authorization, and shall include the report in the next annual report
                                                                                   submitted under section 7001 of the Water Resources Reform and Development Act
                                                                                   of 2014 (33 U.S.C. 2282d).
                                                                                      (i) SUNSET.—The authority to commence a feasibility study under this section
                                                                                   shall terminate on the date that is 10 years after the date of enactment of this Act.
                                                                                      (j) REPORT.—Not later than 5 years and 10 years after the date of enactment of
                                                                                   this Act, the Secretary shall submit to the Committee on Transportation and Infra-
                                                                                   structure of the House of Representatives and the Committee on Environment and
                                                                                   Public Works of the Senate, and make publicly available, a report detailing the re-
                                                                                   sults of the pilot program carried out under this section, including—
                                                                                           (1) a description of proposals received from non-Federal interests pursuant to
                                                                                         subsection (b)(1);
                                                                                           (2) a description of technical assistance provided to non-Federal interests
                                                                                         under subsection (b)(2); and
                                                                                           (3) a description of proposals selected under subsection (b)(3) and criteria
                                                                                         used to select such proposals.
                                                                                      (k) STATE DEFINED.—In this section, the term ‘‘State’’ means each of the several
                                                                                   States, the District of Columbia, and each of the commonwealths, territories, and
                                                                                   possessions of the United States.
                                                                                   SEC. 120. PERMANENT MEASURES TO REDUCE EMERGENCY FLOOD FIGHTING NEEDS FOR
                                                                                              COMMUNITIES SUBJECT TO REPETITIVE FLOODING.
                                                                                       (a) DEFINITIONS.—In this section:
                                                                                            (1) AFFECTED COMMUNITY.—The term ‘‘affected community’’ means a legally
                                                                                         constituted public body (as that term is used in section 221(b) of the Flood Con-
                                                                                         trol Act of 1970 (42 U.S.C. 1962d–5b(b))—
                                                                                                 (A) with jurisdiction over an area that has been subject to flooding in two
                                                                                              or more events in any 10-year period; and
                                                                                                 (B) that has received emergency flood-fighting assistance, including con-
                                                                                              struction of temporary barriers by the Secretary, under section 5 of the Act
                                                                                              of August 18, 1941 (33 U.S.C. 701n) with respect to such flood events.
                                                                                            (2) NATURAL FEATURE; NATURE-BASED FEATURE.—The terms ‘‘natural feature’’
                                                                                         and ‘‘nature-based feature’’ have the meanings given those terms in section
                                                                                         1184 of the Water Resources Development Act of 2016 (33 U.S.C. 2289a).
                                                                                       (b) PROGRAM.—
                                                                                            (1) IN GENERAL.—The Secretary is authorized to carry out a program to study,
                                                                                         design, and construct water resources development projects through measures
                                                                                         involving, among other things, strengthening, raising, extending, realigning, or
                                                                                         otherwise modifying existing flood control works, designing new works, and in-
                                                                                         corporating natural features, nature-based features, or nonstructural features,
                                                                                         as appropriate to provide flood and coastal storm risk management to affected
                                                                                         communities.
                                                                                            (2) CONSIDERATIONS.—In carrying out paragraph (1), the Secretary shall, to




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         the maximum extent practical, review and, where appropriate, incorporate nat-
                                                                                         ural features or nature-based features, or a combination of such features and
                                                                                         nonstructural features, that avoid or reduce at least 50 percent of flood or storm




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00011   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      12
                                                                                        damages in one or more of the alternatives included in the final alternatives
                                                                                        evaluated.
                                                                                          (3) CONSTRUCTION.—
                                                                                               (A) IN GENERAL.—The Secretary may carry out a project described in
                                                                                            paragraph (1) without further congressional authorization if—
                                                                                                    (i) the Secretary determines that the project—
                                                                                                          (I) is advisable to reduce the risk of flooding for an affected com-
                                                                                                       munity; and
                                                                                                          (II) produces benefits that are in excess of the estimated costs;
                                                                                                       and
                                                                                                    (ii) the Federal share of the cost of the construction does not exceed
                                                                                                 $15,000,000.
                                                                                               (B) SPECIFIC AUTHORIZATION.—If the Federal share of the cost of a project
                                                                                            described in paragraph (1) exceeds $15,000,000, the Secretary shall submit
                                                                                            the project recommendation to Congress for authorization prior to construc-
                                                                                            tion, and shall include the project recommendation in the next annual re-
                                                                                            port submitted under section 7001 of the Water Resources Reform and De-
                                                                                            velopment Act of 2014.
                                                                                               (C) FINANCING.—
                                                                                                    (i) CONTRIBUTIONS.—If, based on a study carried out pursuant to
                                                                                                 paragraph (1), the Secretary determines that a project described in
                                                                                                 paragraph (1) will not produce benefits greater than cost, the Secretary
                                                                                                 shall allow the affected community to pay, or provide contributions
                                                                                                 equal to, an amount sufficient to make the remaining costs of design
                                                                                                 and construction of the project equal to the estimated value of the bene-
                                                                                                 fits of the project.
                                                                                                    (ii) EFFECT ON NON-FEDERAL SHARE.—Amounts provided by an af-
                                                                                                 fected community under clause (i) shall be in addition to any payments
                                                                                                 or contributions the affected community is required to provide toward
                                                                                                 the remaining costs of design and construction of the project under sec-
                                                                                                 tion 103 of the Water Resources Development Act of 1986 (33 U.S.C.
                                                                                                 2213).
                                                                                          (4) ABILITY TO PAY.—
                                                                                               (A) IN GENERAL.—Any cost-sharing agreement for a project entered into
                                                                                            pursuant to this section shall be subject to the ability of the affected com-
                                                                                            munity to pay.
                                                                                               (B) DETERMINATION.—The ability of any affected community to pay shall
                                                                                            be determined by the Secretary in accordance with procedures established
                                                                                            by the Secretary.
                                                                                               (C) EFFECT OF REDUCTION.—Any reduction in the non-Federal share of
                                                                                            the cost of a project described in paragraph (1) as a result of a determina-
                                                                                            tion under this paragraph shall not be included in the Federal share for
                                                                                            purposes of subparagraphs (A) and (B) of paragraph (3).
                                                                                   SEC. 121. EMERGENCY RESPONSE TO NATURAL DISASTERS.
                                                                                    (a) IN GENERAL.—Section 5 of the Act of August 18, 1941 (33 U.S.C. 701n) is
                                                                                   amended—
                                                                                         (1) in subsection (a), by adding at the end the following—
                                                                                         ‘‘(5) FEASIBILITY STUDY.—
                                                                                               ‘‘(A) DETERMINATION.—Not later than 180 days after receiving, from a
                                                                                            non-Federal sponsor of a project to repair or rehabilitate a flood control
                                                                                            work described in paragraph (1), a request to initiate a feasibility study to
                                                                                            further modify the relevant flood control work to provide for an increased
                                                                                            level of protection, the Secretary shall provide to the non-Federal sponsor
                                                                                            a written decision on whether the Secretary has the authority under section
                                                                                            216 of the Flood Control Act of 1970 (33 U.S.C. 549a) to undertake the re-
                                                                                            quested feasibility study.
                                                                                               ‘‘(B) RECOMMENDATION.—If the Secretary determines under subparagraph
                                                                                            (B) that the Secretary does not have the authority to undertake the re-
                                                                                            quested feasibility study, the Secretary shall include the request for a feasi-
                                                                                            bility study in the annual report submitted under section 7001 of the Water
                                                                                            Resources Reform and Development Act of 2014.’’;
                                                                                         (2) in subsection (c)—
                                                                                               (A) in the subsection heading, by striking ‘‘LEVEE OWNERS MANUAL’’ and
                                                                                            inserting ‘‘ELIGIBILITY’’;
                                                                                               (B) in paragraph (1), in the heading, by striking ‘‘IN GENERAL’’ and insert-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                            ing ‘‘LEVEE OWNER’S MANUAL’’;
                                                                                               (C) by redesignating paragraphs (2) and (3) as paragraphs (3) and (4), re-
                                                                                            spectively, and inserting after paragraph (1) the following:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00012   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      13
                                                                                           ‘‘(2) COMPLIANCE.—
                                                                                                 ‘‘(A) IN GENERAL.—Notwithstanding the status of compliance of a non-
                                                                                              Federal interest with the requirements of a levee owner’s manual described
                                                                                              in paragraph (1), or with any other eligibility requirement established by
                                                                                              the Secretary related to the maintenance and upkeep responsibilities of the
                                                                                              non-Federal interest, the Secretary shall consider the non-Federal interest
                                                                                              to be eligible for repair and rehabilitation assistance under this section if
                                                                                              the non-Federal interest—
                                                                                                      ‘‘(i) enters into a written agreement with the Secretary that identifies
                                                                                                    any items of deferred or inadequate maintenance and upkeep identified
                                                                                                    by the Secretary prior to the natural disaster; and
                                                                                                      ‘‘(ii) pays, during performance of the repair and rehabilitation work,
                                                                                                    all costs to address—
                                                                                                             ‘‘(I) any items of deferred or inadequate maintenance and upkeep
                                                                                                          identified by the Secretary; and
                                                                                                             ‘‘(II) any repair or rehabilitation work necessary to address dam-
                                                                                                          age the Secretary attributes to such deferred or inadequate mainte-
                                                                                                          nance or upkeep.
                                                                                                 ‘‘(B) ELIGIBILITY.—The Secretary may only enter into one agreement
                                                                                              under subparagraph (A) with any non-Federal interest.
                                                                                                 ‘‘(C) SUNSET.—The authority of the Secretary to enter into agreements
                                                                                              under paragraph (2) shall terminate on the date that is 5 years after the
                                                                                              date of enactment of this paragraph.’’; and
                                                                                                 (D) in paragraph (3) (as so redesignated), by striking ‘‘this subsection’’
                                                                                              and inserting ‘‘paragraph (1)’’.
                                                                                   SEC. 122. STUDY ON NATURAL INFRASTRUCTURE AT CORPS OF ENGINEERS PROJECTS.
                                                                                      (a) DEFINITION OF NATURAL FEATURE AND NATURE-BASED FEATURE.—In this sec-
                                                                                   tion, the terms ‘‘natural feature’’ and ‘‘nature-based feature’’ have the meanings
                                                                                   given those terms in section 1184(a) of the Water Resources Development Act of
                                                                                   2016 (33 U.S.C. 2289a(a)).
                                                                                      (b) STUDY.—Not later than 2 years after the date of enactment of this Act, the
                                                                                   Comptroller General of the United States shall conduct, and submit to the Com-
                                                                                   mittee on Transportation and Infrastructure of the House of Representatives and
                                                                                   the Committee on Environment and Public Works of the Senate, a report on the re-
                                                                                   sults of a study on the consideration by the Secretary of natural infrastructure, nat-
                                                                                   ural features, and nature-based features in the study of the feasibility of projects
                                                                                   for flood risk management, hurricane and storm damage risk reduction, and eco-
                                                                                   system restoration.
                                                                                      (c) REQUIREMENTS.—The study under subsection (b) shall include—
                                                                                           (1) a description of guidance or instructions issued, and other measures taken,
                                                                                         by the Secretary to consider natural infrastructure, natural features, and na-
                                                                                         ture-based features in project feasibility studies;
                                                                                           (2) an assessment, based on information from relevant Federal and non-Fed-
                                                                                         eral sources, of—
                                                                                                (A) the costs, benefits, and effects associated with natural infrastructure,
                                                                                              natural features, and nature-based features recommended by the Secretary
                                                                                              for flood risk management, hurricane and storm damage risk reduction, and
                                                                                              ecosystem restoration; and
                                                                                                (B) the effectiveness of natural infrastructure, natural features, and na-
                                                                                              ture-based features;
                                                                                           (3) an analysis of projects for flood risk management, hurricane and storm
                                                                                         damage risk reduction, and ecosystem restoration that have incorporated nat-
                                                                                         ural infrastructure, natural features, or nature-based features to identify best
                                                                                         practices, including for measuring project benefits and costs;
                                                                                           (4) a description of any statutory, fiscal, regulatory, or other policy barriers
                                                                                         to the appropriate consideration and use of a full array of natural infrastruc-
                                                                                         ture, natural features, and nature-based features in carrying out feasibility
                                                                                         studies and projects; and
                                                                                           (5) any recommendations for changes to law, or to fiscal, regulatory, or other
                                                                                         policies, to improve the use of natural infrastructure, natural features, and na-
                                                                                         ture-based features by the Corps of Engineers in carrying out feasibility studies
                                                                                         and projects.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   SEC. 123. REVIEW OF CORPS OF ENGINEERS ASSETS.
                                                                                     Section 6002 of the Water Resources Reform and Development Act of 2014 (128
                                                                                   Stat. 1349) is amended to read as follows:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00013   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      14
                                                                                   ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS ASSETS.
                                                                                      ‘‘(a) ASSESSMENT.—The Secretary shall conduct an assessment of projects con-
                                                                                   structed by the Secretary for which the Secretary continues to have financial or
                                                                                   operational responsibility.
                                                                                      ‘‘(b) INVENTORY.—Not later than 18 months after the date of enactment of the
                                                                                   Water Resources Development Act of 2020, the Secretary shall, based on the assess-
                                                                                   ment carried out under subsection (a), develop an inventory of projects or portions
                                                                                   of projects—
                                                                                            ‘‘(1) that are not needed for the missions of the Corps of Engineers;
                                                                                            ‘‘(2) the modification of which, including though the use of natural features
                                                                                          or nature-based features (as those terms are defined in section 1184(a) of the
                                                                                          Water Resources Development Act of 2016 (33 U.S.C. 2289a(a)), could improve
                                                                                          the sustainable operations of the project, or reduce operation and maintenance
                                                                                          costs for the project; or
                                                                                            ‘‘(3) that are no longer having project purposes adequately met by the Corps
                                                                                          of Engineers, because of deferment of maintenance or other challenges, and the
                                                                                          divestment of which to a non-Federal entity could better meet the local and re-
                                                                                          gional needs for operation and maintenance.
                                                                                      ‘‘(c) CRITERIA.—In conducting the assessment under subsection (a) and developing
                                                                                   the inventory under subsection (b), the Secretary shall use the following criteria:
                                                                                            ‘‘(1) The extent to which the project aligns with the current missions of the
                                                                                          Corps of Engineers.
                                                                                            ‘‘(2) The economic and environmental impacts of the project on existing com-
                                                                                          munities in the vicinity of the project.
                                                                                            ‘‘(3) The extent to which the divestment or modification of the project could
                                                                                          reduce operation and maintenance costs of the Corps of Engineers.
                                                                                            ‘‘(4) The extent to which the divestment or modification of the project is in
                                                                                          the public interest.
                                                                                            ‘‘(5) The extent to which investment of additional Federal resources in the
                                                                                          project proposed for divestment or modification, including investment needed to
                                                                                          bring the project to a good state of repair, is in the public interest.
                                                                                            ‘‘(6) The extent to which the authorized purpose of the project is no longer
                                                                                          being met.
                                                                                      ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL INTERESTS.—A non-Federal interest for
                                                                                   a project may recommend that the Secretary include such project in the assessment
                                                                                   or inventory required under this section.
                                                                                      ‘‘(e) REPORT TO CONGRESS.—
                                                                                            ‘‘(1) IN GENERAL.—Upon completion of the inventory required by subsection
                                                                                          (b), the Secretary shall submit to the Committee on Environment and Public
                                                                                          Works of the Senate and the Committee on Transportation and Infrastructure
                                                                                          of the House of Representatives, and make publicly available, a report con-
                                                                                          taining the findings of the Secretary with respect to the assessment and inven-
                                                                                          tory required under this section.
                                                                                            ‘‘(2) INCLUSION.—The Secretary shall list in an appendix any recommendation
                                                                                          of a non-Federal interest made with respect to a project under subsection (d)
                                                                                          that the Secretary determines not to include in the inventory developed under
                                                                                          subsection (b), based on the criteria in subsection (c), including information
                                                                                          about the request and the reasons for the Secretary’s determination.’’.
                                                                                   SEC. 124. SENSE OF CONGRESS ON MULTIPURPOSE PROJECTS.
                                                                                     It is the sense of Congress that the Secretary, in coordination with non-Federal
                                                                                   interests, should maximize the development, evaluation, and recommendation of
                                                                                   project alternatives for future water resources development projects that produce
                                                                                   multiple project benefits, such as navigation, flood risk management, and ecosystem
                                                                                   restoration benefits, including through the use of natural or nature-based features
                                                                                   and the beneficial reuse of dredged material.
                                                                                   SEC. 125. BENEFICIAL REUSE OF DREDGED MATERIAL; DREDGED MATERIAL MANAGEMENT
                                                                                              PLANS.
                                                                                       (a) NATIONAL POLICY ON THE BENEFICIAL REUSE OF DREDGED MATERIAL.—
                                                                                            (1) IN GENERAL.—It is the policy of the United States for the Corps of Engi-
                                                                                         neers to maximize the beneficial reuse, in an environmentally acceptable man-
                                                                                         ner, of suitable dredged material obtained from the construction or operation
                                                                                         and maintenance of water resources development projects.
                                                                                            (2) PLACEMENT OF DREDGED MATERIALS.—
                                                                                                 (A) IN GENERAL.—In evaluating the placement of dredged material ob-
                                                                                              tained from the construction or operation and maintenance of water re-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                              sources development projects, the Secretary shall consider—
                                                                                                     (i) the suitability of the dredged material for a full range of beneficial
                                                                                                   uses; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00014   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      15
                                                                                                       (ii) the economic and environmental benefits, efficiencies, and im-
                                                                                                    pacts (including the effects on living coral) of using the dredged mate-
                                                                                                    rial for beneficial uses, including, in the case of beneficial reuse activi-
                                                                                                    ties that involve more than one water resources development project,
                                                                                                    the benefits, efficiencies, and impacts that result from the combined ac-
                                                                                                    tivities.
                                                                                                 (B) CALCULATION OF FEDERAL STANDARD.—The economic benefits and effi-
                                                                                              ciencies from the beneficial use of dredged material considered by the Sec-
                                                                                              retary under subparagraph (A) shall be included in any determination re-
                                                                                              lating to the ‘‘Federal standard’’ by the Secretary under section 335.7 of
                                                                                              title 33, Code of Federal Regulations for the placement or disposal of such
                                                                                              material.
                                                                                       (b) BENEFICIAL USE OF DREDGED MATERIAL.—
                                                                                            (1) PILOT PROGRAM PROJECTS.—Section 1122 of the Water Resources Develop-
                                                                                          ment Act of 2016 (33 U.S.C. 2326 note) is amended—
                                                                                                 (A) in subsection (b)(1), by striking ‘‘20’’ and inserting ‘‘30’’; and
                                                                                                 (B) in subsection (g), by striking ‘‘20’’ and inserting ‘‘30’’.
                                                                                            (2) SENSE OF CONGRESS.—It is the sense of Congress that the Secretary, in
                                                                                          selecting projects for the beneficial reuse of dredged materials under section
                                                                                          1122 of the Water Resources Development Act of 2016 (33 U.S.C. 2326 note),
                                                                                          should ensure the thorough evaluation of project submissions from rural, small,
                                                                                          and economically disadvantaged communities.
                                                                                       (c) FIVE-YEAR REGIONAL DREDGED MATERIAL MANAGEMENT PLANS.—
                                                                                            (1) IN GENERAL.—Not later than 1 year after the date of enactment of this
                                                                                          Act, and annually thereafter, the District Commander of each district of the
                                                                                          Corps of Engineers that obtains dredged material through the construction or
                                                                                          operation and maintenance of a water resources development project shall, at
                                                                                          Federal expense, develop and submit to the Secretary a 5-year dredged material
                                                                                          management plan in coordination with relevant State agencies and stake-
                                                                                          holders.
                                                                                            (2) SCOPE.—Each plan developed under this subsection shall include—
                                                                                                 (A) a dredged material budget for each watershed or littoral system with-
                                                                                               in the district;
                                                                                                 (B) an estimate of the amount of dredged material likely to be obtained
                                                                                               through the construction or operation and maintenance of all water re-
                                                                                               sources development projects projected to be carried out within the district
                                                                                               during the 5-year period following submission of the plan, and the esti-
                                                                                               mated timing for obtaining such dredged material;
                                                                                                 (C) an identification of potential water resources development projects
                                                                                               projected to be carried out within the district during such 5-year period that
                                                                                               are suitable for, or that require, the placement of dredged material, and an
                                                                                               estimate of the amount of dredged material placement capacity of such
                                                                                               projects;
                                                                                                 (D) an evaluation of—
                                                                                                       (i) the suitability of the dredged material for a full range of beneficial
                                                                                                    uses; and
                                                                                                       (ii) the economic and environmental benefits, efficiencies, and im-
                                                                                                    pacts (including the effects on living coral) of using the dredged mate-
                                                                                                    rial for beneficial uses, including, in the case of beneficial reuse activi-
                                                                                                    ties that involve more than one water resources development project,
                                                                                                    the benefits, efficiencies, and impacts that result from the combined ac-
                                                                                                    tivities; and
                                                                                                 (E) the district-wide goals for beneficial reuse of the dredged material, in-
                                                                                               cluding any expected cost savings from aligning and coordinating multiple
                                                                                               projects (including projects across Corps districts) in the reuse of the
                                                                                               dredged material.
                                                                                            (3) PUBLIC COMMENT.—In developing each plan under this subsection, each
                                                                                          District Commander shall provide notice and an opportunity for public com-
                                                                                          ment.
                                                                                            (4) PUBLIC AVAILABILITY.—Upon submission of each plan to the Secretary
                                                                                          under this subsection, each District Commander shall make the plan publicly
                                                                                          available, including on a publicly available website.
                                                                                       (d) DREDGE PILOT PROGRAM.—
                                                                                            (1) REVISIONS.—Section 1111 of the Water Resources Development Act of
                                                                                          2018 (33 U.S.C. 2326 note) is amended—




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                 (A) in subsection (a), by striking ‘‘for the operation and maintenance of
                                                                                               harbors and inland harbors’’ and all that follows through the period at the
                                                                                               end and inserting the following: ‘‘for the—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00015   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      16
                                                                                           ‘‘(1) harbors and inland harbors referred to in section 210(a)(2) of the Water
                                                                                        Resources Development Act of 1986 (33 U.S.C. 2238(a)(2)); or
                                                                                           ‘‘(2) inland and intracoastal waterways of the United States described in sec-
                                                                                        tion 206 of the Inland Waterways Revenue Act of 1978 (33 U.S.C. 1804).’’; and
                                                                                                 (B) in subsection (b), by striking ‘‘or inland harbors’’ and inserting ‘‘, in-
                                                                                              land harbors, or inland or intracoastal waterways’’.
                                                                                           (2) COORDINATION WITH EXISTING AUTHORITIES.—The Secretary may carry out
                                                                                        the dredge pilot program authorized by section 1111 of the Water Resources De-
                                                                                        velopment Act of 2018 (33 U.S.C. 2326 note) in coordination with Federal re-
                                                                                        gional dredge demonstration programs in effect on the date of enactment of this
                                                                                        Act.
                                                                                   SEC. 126. AQUATIC ECOSYSTEM RESTORATION FOR ANADROMOUS FISH.
                                                                                     (a) ANADROMOUS FISH HABITAT AND PASSAGE.—Section 206 of the Water Re-
                                                                                   sources Development Act of 1996 (33 U.S.C. 2330) is amended—
                                                                                           (1) in subsection (a), by adding at the end the following:
                                                                                           ‘‘(3) ANADROMOUS FISH HABITAT AND PASSAGE.—
                                                                                                 ‘‘(A) MEASURES.—A project under this section may include measures to
                                                                                              improve habitat or passage for anadromous fish, including—
                                                                                                      ‘‘(i) installing fish bypass structures on small water diversions;
                                                                                                      ‘‘(ii) modifying tide gates; and
                                                                                                      ‘‘(iii) restoring or reconnecting floodplains and wetlands that are im-
                                                                                                    portant for anadromous fish habitat or passage.
                                                                                                 ‘‘(B) BENEFITS.—A project that includes measures under this paragraph
                                                                                              shall be formulated to maximize benefits for the anadromous fish species
                                                                                              benefitted by the project.’’; and
                                                                                           (2) by adding at the end the following:
                                                                                     ‘‘(g) PRIORITIZATION.—The Secretary shall give projects that include measures de-
                                                                                   scribed in subsection (a)(3) equal priority for implementation as other projects under
                                                                                   this section.’’.
                                                                                   SEC. 127. ANNUAL REPORT TO CONGRESS.
                                                                                     Section 7001(c)(4)(B) of the Water Resources Reform and Development Act of 2014
                                                                                   (33 U.S.C. 2282d(c)(4)(B)) is amended—
                                                                                         (1) in clause (i), by striking ‘‘and’’ at the end;
                                                                                         (2) by redesignating clause (ii) as clause (iii); and
                                                                                         (3) by inserting after clause (i) the following:
                                                                                                   ‘‘(ii) the Secretary shall not include proposals in the appendix of the
                                                                                                annual report that otherwise meet the criteria for inclusion in the an-
                                                                                                nual report solely on the basis that the proposals are for the purposes
                                                                                                of navigation, flood risk management, ecosystem restoration, or munic-
                                                                                                ipal or agricultural water supply; and’’.
                                                                                   SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRATION PROGRAM.
                                                                                     (a) IN GENERAL.—The Secretary shall carry out a demonstration program to deter-
                                                                                   mine the causes of, and implement measures to effectively detect, prevent, treat,
                                                                                   and eliminate, harmful algal blooms associated with water resources development
                                                                                   projects.
                                                                                     (b) CONSULTATION; USE OF EXISTING DATA AND PROGRAM AUTHORITIES.—In car-
                                                                                   rying out the demonstration program under subsection (a), the Secretary shall—
                                                                                          (1) consult with the heads of appropriate Federal and State agencies; and
                                                                                          (2) make maximum use of existing Federal and State data and ongoing pro-
                                                                                        grams and activities of Federal and State agencies, including the activities of
                                                                                        the Secretary carried out through the Engineer Research and Development Cen-
                                                                                        ter pursuant to section 1109 of the Water Resources Development Act of 2018
                                                                                        (33 U.S.C. 610 note).
                                                                                     (c) FOCUS AREAS.—In carrying out the demonstration program under subsection
                                                                                   (a), the Secretary shall undertake program activities related to harmful algal blooms
                                                                                   in the Great Lakes, the tidal and inland waters of the State of New Jersey, the
                                                                                   coastal and tidal waters of the State of Louisiana, the waterways of the counties
                                                                                   that comprise the Sacramento-San Joaquin Delta, California, and Lake Okeechobee,
                                                                                   Florida.
                                                                                   SEC. 129. UPDATE ON INVASIVE SPECIES POLICY GUIDANCE.
                                                                                     (a) IN GENERAL.—The Secretary shall periodically update the Invasive Species
                                                                                   Policy Guidance, developed under section 104 of the River and Harbor Act of 1958
                                                                                   (33 U.S.C. 610) and the Nonindigenous Aquatic Nuisance Prevention and Control




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Act of 1990 (16 U.S.C. 4701 et seq.), in accordance with the most recent National
                                                                                   Invasive Species Council Management Plan developed pursuant to Executive Order
                                                                                   13112.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00016   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      17
                                                                                     (b) INCLUSION.—The Secretary may include in the updated guidance invasive spe-
                                                                                   cies specific efforts at federally authorized water resources development projects lo-
                                                                                   cated in—
                                                                                          (1) high-altitude lakes; and
                                                                                          (2) the Tennessee and Cumberland River basins.
                                                                                   SEC. 130. REPORT ON DEBRIS REMOVAL.
                                                                                      Section 1210 of the Water Resources Development Act of 2018 (132 Stat. 3808)
                                                                                   is amended to read as follows:
                                                                                   ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.
                                                                                     ‘‘Not later than 180 days after the date of enactment of the Water Resources De-
                                                                                   velopment Act of 2020, the Secretary shall submit to Congress and make publicly
                                                                                   available a report that describes—
                                                                                          ‘‘(1) the extent to which, during the 10 fiscal years prior to such date of enact-
                                                                                        ment, the Secretary has carried out section 3 of the Act of March 2, 1945 (33
                                                                                        U.S.C. 603a);
                                                                                          ‘‘(2) how the Secretary has evaluated potential work to be carried out under
                                                                                        that section; and
                                                                                          ‘‘(3) the extent to which the Secretary plans to start, continue, or complete
                                                                                        debris removal activities in the 3 years following submission of the report.’’.
                                                                                   SEC. 131. MISSOURI RIVER INTERCEPTION-REARING COMPLEX CONSTRUCTION.
                                                                                     (a) REPORT.—Not later than 1 year after the date of enactment of this Act, and
                                                                                   annually thereafter, the Secretary shall submit to the Committee on Transportation
                                                                                   and Infrastructure of the House of Representatives and the Committee on Environ-
                                                                                   ment and Public Works of the Senate a report on the effects of any interception-
                                                                                   rearing complex constructed on the Missouri River on—
                                                                                          (1) flood risk management and navigation; and
                                                                                          (2) the population recovery of the pallid sturgeon, including baseline popu-
                                                                                        lation counts.
                                                                                     (b) NO ADDITIONAL IRC CONSTRUCTION.—The Secretary may not authorize con-
                                                                                   struction of an interception-rearing complex on the Missouri River until the Sec-
                                                                                   retary—
                                                                                          (1) submits the report required by subsection (a);
                                                                                          (2) acting through the Engineer Research and Development Center, conducts
                                                                                        further research on interception-rearing complex design, including any effects
                                                                                        on existing flows, flood risk management, and navigation; and
                                                                                          (3) develops a plan—
                                                                                               (A) to repair dikes and revetments that are affecting flood risk and bank
                                                                                             erosion; and
                                                                                               (B) to establish, repair, or improve water control structures at the
                                                                                             headworks of constructed shallow water habitat side-channels.
                                                                                     (c) FUTURE IRC CONSTRUCTION.—
                                                                                          (1) PUBLIC COMMENT.—The Secretary shall provide an opportunity for com-
                                                                                        ment from the public and the Governor of each affected State on any proposals
                                                                                        to construct an interception-rearing complex after the date of enactment of this
                                                                                        Act.
                                                                                          (2) PERIOD.—The public comment period required by paragraph (1) shall be
                                                                                        not less than 90 days for each proposal to construct an interception-rearing
                                                                                        complex on the Missouri River.
                                                                                   SEC. 132. COST AND BENEFIT FEASIBILITY ASSESSMENT.
                                                                                     (a) IN GENERAL.—Section 5(a)(2)(B) of the Act of August 18, 1941 (33 U.S.C.
                                                                                   701n(a)(2)(B)) is amended—
                                                                                          (1) in clause (i)(I), by inserting ‘‘, or provide contributions equal to,’’ after
                                                                                       ‘‘pay’’; and
                                                                                          (2) in clause (ii)—
                                                                                                (A) in the heading, by inserting ‘‘AND CONTRIBUTIONS’’ after ‘‘OF PAY-
                                                                                            MENTS’’;
                                                                                                (B) by inserting ‘‘or contributions’’ after ‘‘Non-Federal payments’’; and
                                                                                                (C) by inserting ‘‘or contributions’’ after ‘‘non-Federal payments’’.
                                                                                     (b) CONTINUED ELIGIBILITY.—Section 1161(b) of the Water Resources Development
                                                                                   Act of 2018 (33 U.S.C. 701n note) is amended—
                                                                                          (1) in the matter preceding paragraph (1)—
                                                                                                (A) by striking the ‘‘three fiscal years preceding’’ and inserting ‘‘five fiscal
                                                                                            years preceding’’; and
                                                                                                (B) by striking ‘‘last day of the third fiscal year’’ and inserting ‘‘last day




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                            of the fifth fiscal year’’;
                                                                                          (2) in paragraph (1), by inserting ‘‘, or provide contributions equal to,’’ before
                                                                                       ‘‘an amount sufficient’’; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00017   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      18
                                                                                          (3) by striking paragraph (2) and inserting the following:
                                                                                          ‘‘(2) the Secretary determines that the damage to the structure was not as a
                                                                                        result of negligent operation or maintenance.’’.
                                                                                   SEC. 133. MATERIALS, SERVICES, AND FUNDS FOR REPAIR, RESTORATION, OR REHABILITA-
                                                                                              TION OF PROJECTS.
                                                                                      (a) IN GENERAL.—In any area covered by an emergency or major disaster declara-
                                                                                   tion declared under the Robert T. Stafford Disaster Relief and Emergency Assist-
                                                                                   ance Act (42 U.S.C. 5121 et seq.), the Secretary is authorized to accept and use ma-
                                                                                   terials, services, and funds, during the period the declaration is in effect, from a
                                                                                   non-Federal interest or private entity to repair, restore, or rehabilitate a federally
                                                                                   authorized water resources development project, and to provide reimbursement to
                                                                                   such non-Federal interest or private entity for such materials, services, and funds,
                                                                                   in the Secretary’s sole discretion, and subject to the availability of appropriations,
                                                                                   if the Secretary determines that reimbursement is in the public interest.
                                                                                      (b) ADDITIONAL REQUIREMENT.—The Secretary may only reimburse for the use of
                                                                                   materials or services accepted under this section if such materials or services meet
                                                                                   the Secretary’s specifications and comply with all applicable laws and regulations
                                                                                   that would apply if such materials and services were acquired by the Secretary, in-
                                                                                   cluding sections 3141 through 3148 and 3701 through 3708 of title 40, United States
                                                                                   Code, section 8302 of title 41, United States Code, and the National Environmental
                                                                                   Policy Act of 1969.
                                                                                      (c) AGREEMENTS.—
                                                                                           (1) IN GENERAL.—Prior to the acceptance of materials, services, or funds
                                                                                         under this section, the Secretary and the non-Federal interest shall enter into
                                                                                         an agreement that specifies—
                                                                                                 (A) the non-Federal interest shall hold and save the United States free
                                                                                              from any and all damages that arise from use of materials or services of
                                                                                              the non-Federal interest, except for damages due to the fault or negligence
                                                                                              of the United States or its contractors;
                                                                                                 (B) the non-Federal interest shall certify that the materials or services
                                                                                              comply with all applicable laws and regulations under subsection (b); and
                                                                                                 (C) any other term or condition required by the Secretary.
                                                                                           (2) EXCEPTION.—If an agreement under paragraph (1) was not entered prior
                                                                                         to materials or services being contributed, a non-Federal interest shall enter
                                                                                         into an agreement with the Secretary that—
                                                                                                 (A) specifies the value, as determined by the Secretary, of those materials
                                                                                              or services contributed and eligible for reimbursement; and
                                                                                                 (B) ensures that the materials or services comply with subsection (b) and
                                                                                              paragraph (1).
                                                                                   SEC. 134. LEVEE SAFETY.
                                                                                      Section 9004 of the Water Resources Development Act of 2007 (33 U.S.C. 3303)
                                                                                   is amended by adding at the end the following:
                                                                                      ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—
                                                                                            ‘‘(1) IN GENERAL.—For each levee included in an inventory established under
                                                                                         subsection (b) or for which the Secretary has conducted a review under sub-
                                                                                         section (c), the Secretary shall—
                                                                                                  ‘‘(A) identify the specific engineering and maintenance deficiencies, if any;
                                                                                               and
                                                                                                  ‘‘(B) describe the recommended remedies to correct each deficiency identi-
                                                                                               fied under subparagraph (A), and, if requested by owner of a non-Federal
                                                                                               levee, the associated costs of those remedies.
                                                                                            ‘‘(2) CONSULTATION.—In identifying deficiencies and describing remedies for a
                                                                                         levee under paragraph (1), the Secretary shall consult with relevant non-Fed-
                                                                                         eral interests, including by providing an opportunity for comment by those non-
                                                                                         Federal interests.’’.
                                                                                   SEC. 135. NATIONAL DAM SAFETY PROGRAM.
                                                                                     (a) DEFINITIONS.—Section 2 of the National Dam Safety Program Act (33 U.S.C.
                                                                                   467) is amended—
                                                                                          (1) in paragraph (4)—
                                                                                               (A) in subparagraph (A)—
                                                                                                    (i) by striking clause (iii) and inserting the following:
                                                                                                    ‘‘(iii) has an emergency action plan that—
                                                                                                           ‘‘(I) is approved by the relevant State dam safety agency; or




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                           ‘‘(II) is in conformance with State law and pending approval by
                                                                                                        the relevant State dam safety agency;’’; and
                                                                                                    (ii) by striking clause (iv) and inserting the following:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00018   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      19
                                                                                                       ‘‘(iv) fails to meet minimum dam safety standards of the State in
                                                                                                    which the dam is located, as determined by the State; and
                                                                                                       ‘‘(v) poses an unacceptable risk to the public, as determined by the
                                                                                                    Administrator, in consultation with the Board.’’; and
                                                                                                 (B) in subparagraph (B)(i), by inserting ‘‘under a hydropower project with
                                                                                              an authorized installed capacity of greater than 1.5 megawatts’’ after
                                                                                              ‘‘dam’’; and
                                                                                            (2) in paragraph (10)—
                                                                                                 (A) in the heading, by striking ‘‘NON-FEDERAL SPONSOR’’ and inserting
                                                                                              ‘‘ELIGIBLE SUBRECIPIENT’’; and
                                                                                                 (B) by striking ‘‘The term ‘non-Federal sponsor’ ’’ and inserting ‘‘The term
                                                                                              ‘eligible subrecipient’ ’’.
                                                                                       (b) REHABILITATION OF HIGH HAZARD POTENTIAL DAMS.—
                                                                                            (1) ESTABLISHMENT OF PROGRAM.—Section 8A(a) of the National Dam Safety
                                                                                         Program Act (33 U.S.C. 467f–2(a)) is amended by striking ‘‘to non-Federal spon-
                                                                                         sors’’ and inserting ‘‘to States with dam safety programs’’.
                                                                                            (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of the National Dam Safety Program
                                                                                         Act (33 U.S.C. 467f–2(b)) is amended, in the matter preceding paragraph (1),
                                                                                         by striking ‘‘for a project may be used for’’ and inserting ‘‘to a State may be used
                                                                                         by the State to award grants to eligible subrecipients for’’.
                                                                                            (3) AWARD OF GRANTS.—Section 8A(c) of the National Dam Safety Program
                                                                                         Act (33 U.S.C. 467f–2(c)) is amended—
                                                                                                 (A) in paragraph (1)(A), by striking ‘‘non-Federal sponsor’’ and inserting
                                                                                              ‘‘State’’; and
                                                                                                 (B) in paragraph (2)—
                                                                                                       (i) in subparagraph (A), by striking ‘‘an eligible high hazard potential
                                                                                                    dam to a non-Federal sponsor’’ and inserting ‘‘eligible high hazard po-
                                                                                                    tential dams to a State’’;
                                                                                                       (ii) in subparagraph (B)—
                                                                                                             (I) in the subparagraph heading, by striking ‘‘PROJECT GRANT’’
                                                                                                           and inserting ‘‘GRANT’’;
                                                                                                             (II) by striking ‘‘project grant agreement with the non-Federal
                                                                                                           sponsor’’ and inserting ‘‘grant agreement with the State’’; and
                                                                                                             (III) by striking ‘‘project,’’ and inserting ‘‘projects for which the
                                                                                                           grant is awarded,’’;
                                                                                                       (iii) by amending subparagraph (C) to read as follows:
                                                                                                 ‘‘(C) GRANT ASSURANCE.—As part of a grant agreement under subpara-
                                                                                              graph (B), the Administrator shall require that each eligible subrecipient to
                                                                                              which the State awards a grant under this section provides an assurance,
                                                                                              with respect to the dam to be rehabilitated by the eligible subrecipient, that
                                                                                              the dam owner will carry out a plan for maintenance of the dam during the
                                                                                              expected life of the dam.’’; and
                                                                                                       (iv) in subparagraph (D), by striking ‘‘A grant provided under this
                                                                                                    section shall not exceed’’ and inserting ‘‘A State may not award a grant
                                                                                                    to an eligible subrecipient under this section that exceeds, for any 1
                                                                                                    dam,’’.
                                                                                            (4) REQUIREMENTS.—Section 8A(d) of the National Dam Safety Program Act
                                                                                         (33 U.S.C. 467f–2(d)) is amended—
                                                                                                 (A) in paragraph (1), by inserting ‘‘to an eligible subrecipient’’ after ‘‘this
                                                                                              section’’;
                                                                                                 (B) in paragraph (2)—
                                                                                                       (i) in the paragraph heading, by striking ‘‘NON-FEDERAL SPONSOR’’
                                                                                                    and inserting ‘‘ELIGIBLE SUBRECIPIENT’’;
                                                                                                       (ii) in the matter preceding subparagraph (A), by striking ‘‘the non-
                                                                                                    Federal sponsor shall’’ and inserting ‘‘an eligible subrecipient shall,
                                                                                                    with respect to the dam to be rehabilitated by the eligible sub-
                                                                                                    recipient’’;
                                                                                                       (iii) in subparagraph (A), by striking ‘‘participate in, and comply
                                                                                                    with,’’ and inserting ‘‘demonstrate that the community in which the
                                                                                                    dam is located participates in, and complies with,’’;
                                                                                                       (iv) in subparagraph (B), by striking ‘‘have’’ and inserting ‘‘beginning
                                                                                                    not later than 2 years after the date on which the Administrator pub-
                                                                                                    lishes criteria for hazard mitigation plans under paragraph (3), dem-
                                                                                                    onstrate that the Tribal or local government with jurisdiction over the
                                                                                                    area in which the dam is located has’’; and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                       (v) in subparagraph (C), by striking ‘‘50-year period’’ and inserting
                                                                                                    ‘‘expected life of the dam’’; and
                                                                                                 (C) by adding at the end the following:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00019   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      20
                                                                                           ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—Not later than 1 year after the date
                                                                                        of enactment of this paragraph, the Administrator, in consultation with the
                                                                                        Board, shall publish criteria for hazard mitigation plans required under para-
                                                                                        graph (2)(B).’’.
                                                                                           (5) FLOODPLAIN MANAGEMENT PLANS.—Section 8A(e) of the National Dam
                                                                                        Safety Program Act (33 U.S.C. 467f–2(e)) is amended—
                                                                                                 (A) in paragraph (1)—
                                                                                                      (i) in the matter preceding subparagraph (A), by striking ‘‘the non-
                                                                                                   Federal sponsor’’ and inserting ‘‘an eligible subrecipient’’; and
                                                                                                      (ii) in subparagraph (B), by striking ‘‘1 year’’ and inserting ‘‘2 years’’
                                                                                                   each place it appears; and
                                                                                                 (B) by striking paragraph (3) and inserting the following:
                                                                                           ‘‘(3) PLAN CRITERIA AND TECHNICAL SUPPORT.—The Administrator, in consulta-
                                                                                        tion with the Board, shall provide criteria, and may provide technical support,
                                                                                        for the development and implementation of floodplain management plans pre-
                                                                                        pared under this subsection.’’.
                                                                                           (6) CONTRACTUAL REQUIREMENTS.—Section 8A(i)(1) of the National Dam Safe-
                                                                                        ty Program Act (33 U.S.C. 467f–2(i)(1)) is amended by striking ‘‘a non-Federal
                                                                                        sponsor’’ and inserting ‘‘an eligible subrecipient’’.
                                                                                   SEC. 136. REHABILITATION OF CORPS OF ENGINEERS CONSTRUCTED PUMP STATIONS.
                                                                                     (a) DEFINITIONS.—In this section:
                                                                                          (1) ELIGIBLE PUMP STATION.—The term ‘‘eligible pump station’’ means a pump
                                                                                        station—
                                                                                                (A) constructed, in whole or in part, by the Corps of Engineers for flood
                                                                                             risk management purposes;
                                                                                                (B) that the Secretary has identified as having a major deficiency; and
                                                                                                (C) the failure of which the Secretary has determined would impair the
                                                                                             function of a flood risk management project constructed by the Corps of En-
                                                                                             gineers.
                                                                                          (2) REHABILITATION.—
                                                                                                (A) IN GENERAL.—The term ‘‘rehabilitation’’, with respect to an eligible
                                                                                             pump station, means to address a major deficiency of the eligible pump sta-
                                                                                             tion caused by long-term degradation of the foundation, construction mate-
                                                                                             rials, or engineering systems or components of the eligible pump station.
                                                                                                (B) INCLUSIONS.—The term ‘‘rehabilitation’’, with respect to an eligible
                                                                                             pump station, includes—
                                                                                                     (i) the incorporation into the eligible pump station of—
                                                                                                           (I) current design standards;
                                                                                                           (II) efficiency improvements; and
                                                                                                           (III) associated drainage; and
                                                                                                     (ii) increasing the capacity of the eligible pump station, subject to the
                                                                                                  condition that the increase shall—
                                                                                                           (I) significantly decrease the risk of loss of life and property dam-
                                                                                                        age; or
                                                                                                           (II) decrease total lifecycle rehabilitation costs for the eligible
                                                                                                        pump station.
                                                                                     (b) AUTHORIZATION.—The Secretary may carry out rehabilitation of an eligible
                                                                                   pump station, if the Secretary determines that the rehabilitation is feasible.
                                                                                     (c) COST SHARING.—The non-Federal interest for the eligible pump station shall—
                                                                                          (1) provide 35 percent of the cost of rehabilitation of an eligible pump station
                                                                                        carried out under this section; and
                                                                                          (2) provide all land, easements, rights-of-way, and necessary relocations asso-
                                                                                        ciated with the rehabilitation described in subparagraph (A), at no cost to the
                                                                                        Federal Government.
                                                                                     (d) AGREEMENT REQUIRED.—The rehabilitation of an eligible pump station pursu-
                                                                                   ant to this section shall be initiated only after a non-Federal interest has entered
                                                                                   into a binding agreement with the Secretary—
                                                                                          (1) to pay the non-Federal share of the costs of rehabilitation under sub-
                                                                                        section (c); and
                                                                                          (2) to pay 100 percent of the operation and maintenance costs of the rehabili-
                                                                                        tated eligible pump station, in accordance with regulations promulgated by the
                                                                                        Secretary.
                                                                                     (e) TREATMENT.—The rehabilitation of an eligible pump station pursuant to this
                                                                                   section shall not be considered to be a separable element of the associated flood risk




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   management project constructed by the Corps of Engineers.
                                                                                     (f) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated
                                                                                   to carry out this section $60,000,000, to remain available until expended.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00020   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      21
                                                                                   SEC. 137. NON-FEDERAL PROJECT IMPLEMENTATION PILOT PROGRAM.
                                                                                     Section 1043(b) of the Water Resources Reform and Development Act of 2014 (33
                                                                                   U.S.C. 2201 note) is amended—
                                                                                         (1) in paragraph (7), by striking ‘‘the date that is 5 years after the date of
                                                                                       enactment of this Act’’ and inserting ‘‘September 30, 2026’’;
                                                                                         (2) in paragraph (8), by striking ‘‘2023’’ and inserting ‘‘2026’’; and
                                                                                         (3) by adding at the end the following:
                                                                                         ‘‘(9) IMPLEMENTATION GUIDANCE.—
                                                                                               ‘‘(A) IN GENERAL.—Not later than 120 days after the date of enactment
                                                                                            of this paragraph, the Secretary shall issue guidance for the implementa-
                                                                                            tion of the pilot program that, to the extent practicable, identifies—
                                                                                                    ‘‘(i) the metrics for measuring the success of the pilot program;
                                                                                                    ‘‘(ii) a process for identifying future projects to participate in the pilot
                                                                                                  program;
                                                                                                    ‘‘(iii) measures to address the risks of a non-Federal interest con-
                                                                                                  structing projects under the pilot program, including which entity bears
                                                                                                  the risk for projects that fail to meet the Corps of Engineers standards
                                                                                                  for design or quality;
                                                                                                    ‘‘(iv) the laws and regulations that a non-Federal interest must follow
                                                                                                  in carrying out a project under the pilot program; and
                                                                                                    ‘‘(v) which entity bears the risk in the event that a project carried
                                                                                                  out under the pilot program fails to be carried out in accordance with
                                                                                                  the project authorization or this subsection.
                                                                                               ‘‘(B) NEW PROJECT PARTNERSHIP AGREEMENTS.—The Secretary may not
                                                                                            enter into a project partnership agreement under this subsection during the
                                                                                            period beginning on the date of enactment of this paragraph and ending on
                                                                                            the date on which the Secretary issues the guidance under subparagraph
                                                                                            (A).’’.
                                                                                   SEC. 138. DEFINITION OF ECONOMICALLY DISADVANTAGED COMMUNITY.
                                                                                     (a) IN GENERAL.—Not later than 180 days after the date of enactment of this Act,
                                                                                   the Secretary shall issue guidance defining the term ‘‘economically disadvantaged
                                                                                   community’’ for the purposes of this Act and the amendments made by this Act.
                                                                                     (b) CONSIDERATIONS.—In defining the term ‘‘economically disadvantaged commu-
                                                                                   nity’’ under subsection (a), the Secretary shall, to the maximum extent practicable,
                                                                                   utilize the criteria under paragraphs (1) or (2) of section 301(a) of the Public Works
                                                                                   and Economic Development Act of 1965 (42 U.S.C. 3161), to the extent that such
                                                                                   criteria are applicable in relation to the development of water resources develop-
                                                                                   ment projects.
                                                                                   SEC. 139. COST SHARING PROVISIONS FOR TERRITORIES AND INDIAN TRIBES.
                                                                                     Section 1156(b) of the Water Resources Development Act of 1986 (33 U.S.C.
                                                                                   2310(b)) is amended by striking ‘‘inflation’’ and all that follows through the period
                                                                                   at the end and inserting ‘‘on an annual basis for inflation.’’.
                                                                                   SEC. 140. FLOOD CONTROL AND OTHER PURPOSES.
                                                                                      Section 103(k) of the Water Resources Development Act of 1986 (33 U.S.C. 2213)
                                                                                   is amended—
                                                                                          (1) by striking ‘‘Except as’’ and inserting the following:
                                                                                          ‘‘(1) IN GENERAL.—Except as’’; and
                                                                                          (2) by adding at the end the following:
                                                                                          ‘‘(2) RENEGOTIATION OF TERMS.—
                                                                                                ‘‘(A) IN GENERAL.—At the request of a non-Federal interest, the Secretary
                                                                                             and the non-Federal interest may renegotiate the terms and conditions of
                                                                                             an eligible deferred payment, including—
                                                                                                      ‘‘(i) permitting the non-Federal contribution to be made without in-
                                                                                                   terest, pursuant to paragraph (1);
                                                                                                      ‘‘(ii) recalculation of the interest rate;
                                                                                                      ‘‘(iii) full or partial forgiveness of interest accrued during the period
                                                                                                   of construction; and
                                                                                                      ‘‘(iv) a credit against construction interest for a non-Federal invest-
                                                                                                   ment that benefits the completion or performance of the project or sepa-
                                                                                                   rable element.
                                                                                                ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An eligible deferred payment agree-
                                                                                             ment under subparagraph (A) is an agreement for which—
                                                                                                      ‘‘(i) the non-Federal contribution was made with interest;
                                                                                                      ‘‘(ii) the period of project construction exceeds 10 years from the exe-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                   cution of a project partnership agreement or appropriation of funds;
                                                                                                   and
                                                                                                      ‘‘(iii) the construction interest exceeds $45,000,000.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00021   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      22
                                                                                                ‘‘(C) CREDIT FOR NON-FEDERAL CONTRIBUTION.—
                                                                                                      ‘‘(i) IN GENERAL.—The Secretary is authorized to credit any costs in-
                                                                                                   curred by the non-Federal interest (including in-kind contributions) to
                                                                                                   remedy a design or construction deficiency of a covered project or sepa-
                                                                                                   rable element toward the non-Federal share of the cost of the covered
                                                                                                   project, if the Secretary determines the remedy to be integral to the
                                                                                                   completion or performance of the covered project.
                                                                                                      ‘‘(ii) CREDIT OF COSTS.—If the non-Federal interest incurs costs or in-
                                                                                                   kind contributions for a project to remedy a design or construction defi-
                                                                                                   ciency of a project or separable element which has a 100 percent Fed-
                                                                                                   eral cost share, and the Secretary determines the remedy to be integral
                                                                                                   to the completion or performance of the project, the Secretary is author-
                                                                                                   ized to credit such costs to any interest accrued on a deferred non-Fed-
                                                                                                   eral contribution.’’.
                                                                                   SEC. 141. REVIEW OF CONTRACTING POLICIES.
                                                                                      (a) IN GENERAL.—Not later than 180 days after the date of enactment of this sec-
                                                                                   tion, the Secretary shall complete a review of the policies, guidelines, and regula-
                                                                                   tions of the Corps of Engineers for the development of contractual agreements be-
                                                                                   tween the Secretary and non-Federal interests and utilities associated with the con-
                                                                                   struction of water resources development projects.
                                                                                      (b) REPORT.—Not later than 90 days after completing the review under subsection
                                                                                   (a), the Secretary shall submit to the Committee on Transportation and Infrastruc-
                                                                                   ture of the House of Representatives and the Committee on Environment and Public
                                                                                   Works of the Senate, and make publicly available, a report that includes—
                                                                                           (1) a summary of the results of the review; and
                                                                                           (2) public guidance on best practices for non-Federal interest to use when
                                                                                         writing or developing contractual agreements with the Secretary and utilities.
                                                                                      (c) PROVISION OF GUIDANCE.—The Secretary shall provide the best practices guid-
                                                                                   ance included under subsection (b)(2) to non-Federal interests prior to the develop-
                                                                                   ment of contractual agreements.
                                                                                   SEC. 142. BUY AMERICA.
                                                                                     With respect to all Corps of Engineers construction and rehabilitation contracts
                                                                                   to be awarded after the date of enactment of this Act, the steel components fur-
                                                                                   nished and delivered under such contracts shall be manufactured or fabricated in
                                                                                   whole or substantial part in the United States with steel produced or made in the
                                                                                   United States, its territories, or possessions.
                                                                                   SEC. 143. ANNUAL REPORT ON STATUS OF FEASIBILITY STUDIES.
                                                                                      Concurrent with each report submitted under section 7001 of the Water Resources
                                                                                   Reform and Development Act of 2014 (33 U.S.C. 2282d), the Secretary shall submit
                                                                                   to the Committee on Transportation and Infrastructure of the House of Representa-
                                                                                   tives and the Committee on Environment and Public Works a report that provides
                                                                                   for an accounting of all outstanding feasibility studies being conducted by the Sec-
                                                                                   retary, including, for each such study, its length, cost, and expected completion date.

                                                                                                    TITLE II—STUDIES AND REPORTS
                                                                                   SEC. 201. AUTHORIZATION OF PROPOSED FEASIBILITY STUDIES.
                                                                                      (a) IN GENERAL.—The Secretary is authorized to conduct a feasibility study for the
                                                                                   following projects for water resources development and conservation and other pur-
                                                                                   poses, as identified in the reports titled ‘‘Report to Congress on Future Water Re-
                                                                                   sources Development’’ submitted to Congress pursuant to section 7001 of the Water
                                                                                   Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) or otherwise re-
                                                                                   viewed by Congress:
                                                                                           (1) TONTO CREEK, GILA RIVER, ARIZONA.—Project for flood risk management,
                                                                                        Tonto Creek, Gila River, Arizona.
                                                                                           (2) SULPHUR RIVER, ARKANSAS AND TEXAS.—Project for ecosystem restoration,
                                                                                        Sulphur River, Arkansas and Texas.
                                                                                           (3) CABLE CREEK, CALIFORNIA.—Project for flood risk management, water sup-
                                                                                        ply, and related benefits, Cable Creek, California.
                                                                                           (4) DEL MAR BLUFFS, CALIFORNIA.—Project for shoreline stabilization, Del Mar
                                                                                        Bluffs, San Diego County, California.
                                                                                           (5) REDBANK AND FANCHER CREEKS, CALIFORNIA.—Project for water conserva-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        tion and water supply, Redbank and Fancher Creeks, California.
                                                                                           (6) RIO HONDO CHANNEL, CALIFORNIA.—Project for ecosystem restoration, Rio
                                                                                        Hondo Channel, San Gabriel River, California.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00022   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      23
                                                                                           (7) SOUTHERN CALIFORNIA, CALIFORNIA.—Project for coastal storm damage re-
                                                                                        duction, Southern California.
                                                                                           (8) SHINGLE CREEK AND KISSIMMEE RIVER, FLORIDA.—Project for ecosystem
                                                                                        restoration and water storage, Shingle Creek and Kissimmee River, Osceola
                                                                                        County, Florida.
                                                                                           (9) ST. JOHN’S RIVER AND LAKE JESUP, FLORIDA.—Project for ecosystem restora-
                                                                                        tion, St. John’s River and Lake Jesup, Florida.
                                                                                           (10) WAIMEA RIVER, HAWAII.—Project for flood risk management, Waimea
                                                                                        River, Kauai, Hawaii.
                                                                                           (11) CHICAGO AREA WATERWAYS SYSTEM, ILLINOIS.—Project for ecosystem res-
                                                                                        toration, recreation, and other purposes, Illinois River, Chicago River, Calumet
                                                                                        River, Grand Calumet River, Little Calumet River, and other waterways in the
                                                                                        vicinity of Chicago, Illinois.
                                                                                           (12) FOX RIVER, ILLINOIS.—Project for flood risk management, Fox River, Illi-
                                                                                        nois.
                                                                                           (13) LOWER MISSOURI RIVER, KANSAS.—Project for bank stabilization and navi-
                                                                                        gation, Lower Missouri River, Sioux City, Kansas.
                                                                                           (14) TANGIPAHOA PARISH, LOUISIANA.—Project for flood risk management,
                                                                                        Tangipahoa Parish, Louisiana.
                                                                                           (15) KENT NARROWS AND CHESTER RIVER, MARYLAND.—Project for navigation,
                                                                                        Kent Narrows and Chester River, Queen Anne’s County, Maryland.
                                                                                           (16) BOSTON, MASSACHUSETTS.—Project for hurricane and storm damage risk
                                                                                        reduction, Boston, Massachusetts, pursuant to the comprehensive study author-
                                                                                        ized under the Disaster Relief Appropriations Act, 2013 (Public Law 113–2).
                                                                                           (17) LOWER ST. CROIX RIVER, MINNESOTA.—Project for flood risk management,
                                                                                        ecosystem restoration, and recreation, Lower St. Croix River, Minnesota.
                                                                                           (18) ESCATAWPA RIVER BASIN, MISSISSIPPI.—Project for flood risk management
                                                                                        and ecosystem restoration, Escatawpa River, Jackson County, Mississippi.
                                                                                           (19) LONG BEACH, BAY ST. LOUIS AND MISSISSIPPI SOUND, MISSISSIPPI.—Project
                                                                                        for hurricane and storm damage risk reduction and flood risk management,
                                                                                        Long Beach, Bay St. Louis and Mississippi Sound, Mississippi.
                                                                                           (20) PASCAGOULA RIVER BASIN, MISSISSIPPI.—Project for comprehensive water-
                                                                                        shed study, Pascagoula, Mississippi.
                                                                                           (21) TALLAHOMA AND TALLAHALA CREEKS, MISSISSIPPI.—Project for flood risk
                                                                                        management, Leaf River, Jones County, Mississippi.
                                                                                           (22) LOWER OSAGE RIVER BASIN, MISSOURI.—Project for ecosystem restoration,
                                                                                        Lower Osage River Basin, Missouri.
                                                                                           (23) UPPER BASIN AND STONY BROOK (GREEN BROOK SUB-BASIN), RARITAN RIVER
                                                                                        BASIN, NEW JERSEY.—Reevaluation of the Upper Basin and Stony Brook portions
                                                                                        of the project for flood control, Green Brook Sub-basin, Raritan River Basin,
                                                                                        New Jersey, authorized by section 401 of the Water Resources Development Act
                                                                                        of 1986 (100 Stat. 4119), including the evaluation of nonstructural measures to
                                                                                        achieve the project purpose.
                                                                                           (24) LAKE ONTARIO SHORELINE, NEW YORK.—Project for coastal storm resil-
                                                                                        iency, Lake Ontario shoreline, New York.
                                                                                           (25) WADING RIVER CREEK, NEW YORK.—Project for hurricane and storm dam-
                                                                                        age risk reduction, flood risk management, navigation, and ecosystem restora-
                                                                                        tion, Wading River Creek, New York.
                                                                                           (26) REEL POINT PRESERVE, NEW YORK.—Project for navigation and shoreline
                                                                                        stabilization, Reel Point Preserve, New York.
                                                                                           (27) GOLDSMITH INLET, NEW YORK.—Project for navigation, Goldsmith Inlet,
                                                                                        New York.
                                                                                           (28) TUSCARAWAS RIVER BASIN, OHIO.—Project for comprehensive watershed
                                                                                        study, Tuscarawas River Basin, Ohio.
                                                                                           (29) LOWER COLUMBIA RIVER BASIN (TURNING BASIN), OREGON AND WASH-
                                                                                        INGTON.—Project to improve turning basins for the project for navigation, Co-
                                                                                        lumbia River Channel, Oregon and Washington, authorized by section
                                                                                        101(b)(13) of the Water Resources Development Act of 1999 (113 Stat. 280).
                                                                                           (30) WILLIAMSPORT, PENNSYLVANIA.—Project for flood risk management and
                                                                                        levee rehabilitation, greater Williamsport, Pennsylvania.
                                                                                           (31) CITY OF CHARLESTON, SOUTH CAROLINA.—Project for tidal- and inland-re-
                                                                                        lated flood risk management, Charleston, South Carolina.
                                                                                           (32) TENNESSEE AND CUMBERLAND RIVER BASINS, TENNESSEE.—Project to
                                                                                        deter, impede, or restrict the dispersal of aquatic nuisance species in the Ten-
                                                                                        nessee and Cumberland River Basins, Tennessee.
                                                                                           (33) SABINE PASS TO GALVESTON BAY, TEXAS.—Modification of the project for




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        hurricane and storm damage risk reduction, Port Arthur and Orange County,
                                                                                        Texas, authorized by section 203 of the Flood Control Act of 1962 (76 Stat.
                                                                                        1184), and authorized as a separable element of the project for Sabine Pass to




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00023   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      24
                                                                                        Galveston Bay, authorized by item 3 of section 1401(3) of the Water Resources
                                                                                        Development Act of 2018 (132 Stat. 3838), to reduce the risk of flooding through
                                                                                        the construction of improvements to interior drainage.
                                                                                           (34) PORT OF VICTORIA, TEXAS.—Project for flood risk management, Port of
                                                                                        Victoria, Texas.
                                                                                           (35) LOWER FOX RIVER BASIN, WISCONSIN.—Project for comprehensive water-
                                                                                        shed study, Lower Fox River Basin, Wisconsin.
                                                                                           (36) UPPER FOX RIVER AND WOLF RIVER, WISCONSIN.—Project for flood risk
                                                                                        management and ecosystem restoration, Upper Fox River and Wolf River, Wis-
                                                                                        consin.
                                                                                      (b) SPECIAL RULE.—The Secretary shall consider any study carried out by the Sec-
                                                                                   retary to formulate the modifications to the project for hurricane and storm damage
                                                                                   risk reduction, Port Arthur and Orange County, Texas, identified in subsection
                                                                                   (a)(33) to be a continuation of the study carried out for Sabine Pass to Galveston
                                                                                   Bay, Texas, authorized by a resolution of the Committee on Environment and Public
                                                                                   Works of the Senate, approved June 23, 2004, and funded by title IV of division B
                                                                                   of the Bipartisan Budget Act of 2018, under the heading ‘‘Corps of Engineers—
                                                                                   Civil—Department of the Army—Construction’’ (Public Law 115–123; 132 Stat. 76).
                                                                                   SEC. 202. EXPEDITED COMPLETIONS.
                                                                                     (a) FEASIBILITY REPORTS.—The Secretary shall expedite the completion of a feasi-
                                                                                   bility study for each of the following projects, and if the Secretary determines that
                                                                                   the project is justified in a completed report, may proceed directly to preconstruction
                                                                                   planning, engineering, and design of the project:
                                                                                           (1) Project for navigation, St. George Harbor, Alaska.
                                                                                           (2) Project for shoreline stabilization, Aunu‘u Harbor, American Samoa.
                                                                                           (3) Project for shoreline stabilization, Tutuila Island, American Samoa.
                                                                                           (4) Project for flood risk management, Lower Santa Cruz River, Arizona.
                                                                                           (5) Project for flood control, water conservation, and related purposes, Coyote
                                                                                        Valley Dam, California.
                                                                                           (6) Project for flood damage reduction and ecosystem restoration, Del Rosa
                                                                                        Channel, city of San Bernardino, California.
                                                                                           (7) Project for flood risk management, Lower Cache Creek, California.
                                                                                           (8) Project for flood damage reduction and ecosystem restoration, Mission-
                                                                                        Zanja Channel, cities of San Bernardino and Redlands, California.
                                                                                           (9) Project for shoreline protection, Oceanside, California, authorized pursu-
                                                                                        ant to section 414 of the Water Resources Development Act of 2000 (114 Stat.
                                                                                        2636; 121 Stat. 1176).
                                                                                           (10) Project for flood risk management, Prado Basin, California.
                                                                                           (11) Project to modify the project for navigation, San Francisco Bay to Stock-
                                                                                        ton, California.
                                                                                           (12) Project to modify the Seven Oaks Dam, California, portion of the project
                                                                                        for flood control, Santa Ana River Mainstem, California, authorized by section
                                                                                        401(a) of the Water Resources Development Act of 1986 (100 Stat. 4113; 101
                                                                                        Stat. 1329–111; 104 Stat. 4611; 110 Stat. 3713; 121 Stat. 1115), to include water
                                                                                        conservation as an authorized purpose.
                                                                                           (13) Project to modify the project for navigation, Delaware River Mainstem
                                                                                        and Channel Deepening, Delaware, New Jersey, and Pennsylvania, authorized
                                                                                        by section 101(6) of the Water Resources Development Act of 1992 (106 Stat.
                                                                                        4802; 113 Stat. 300; 114 Stat. 2602), to include the construction of a turning
                                                                                        basin located near the Packer Avenue Marine Terminal.
                                                                                           (14) Project for ecosystem restoration, Central and Southern Florida Project
                                                                                        Canal 111 (C–111), South Dade County, Florida.
                                                                                           (15) Project for comprehensive hurricane and storm damage risk reduction
                                                                                        and shoreline erosion protection, Chicago, Illinois, authorized by section
                                                                                        101(a)(12) of the Water Resources Development Act of 1996 (110 Stat. 3664; 113
                                                                                        Stat. 302).
                                                                                           (16) Project for flood risk management, Wheaton, DuPage County, Illinois.
                                                                                           (17) Project for flood damage reduction, ecosystem restoration, and recreation,
                                                                                        Blue River Basin, Kansas City, Kansas, carried out pursuant to the resolution
                                                                                        of the Committee on Transportation and Infrastructure of the House of Rep-
                                                                                        resentatives adopted on September 24, 2008 (docket number 2803).
                                                                                           (18) Project for flood control, Amite River and Tributaries east of the Mis-
                                                                                        sissippi River, Louisiana.
                                                                                           (19) Project for coastal storm risk management, Upper Barataria Basin, Lou-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        isiana.
                                                                                           (20) Project to replace the Bourne and Sagamore Bridges, Cape Cod, Massa-
                                                                                        chusetts.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00024   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      25
                                                                                           (21) Project to deepen the project for navigation, Gulfport Harbor, Mississippi,
                                                                                         authorized by section 202(a) of the Water Resources Development Act of 1986
                                                                                         (100 Stat. 4094).
                                                                                           (22) Project for flood risk management, Rahway River Basin, New Jersey.
                                                                                           (23) Project for hurricane and storm damage risk reduction, Raritan Bay and
                                                                                         Sandy Hook Bay, Highlands, New Jersey.
                                                                                           (24) Project for navigation, Shark River, New Jersey.
                                                                                           (25) Project for flood risk management, Rondout Creek-Wallkill River Water-
                                                                                         shed, New York, carried out pursuant to the resolution of the Committee on
                                                                                         Transportation and Infrastructure of the House of Representatives adopted on
                                                                                         May 2, 2007 (docket number 2776).
                                                                                           (26) Project for ecosystem restoration and hurricane and storm damage risk
                                                                                         reduction, Spring Creek South (Howard Beach), Queens, New York.
                                                                                           (27) Project to resolve increased silting and shoaling adjacent to the Federal
                                                                                         channel, Port of Bandon, Coquille River, Oregon.
                                                                                           (28) Project for flood control, 42nd Street Levee, Springfield, Oregon, being
                                                                                         carried out under section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s).
                                                                                           (29) Project for ecosystem restoration, Hood River at the confluence with the
                                                                                         Columbia River, Oregon.
                                                                                           (30) Project for flood risk management, Rio Culebrinas, Puerto Rico.
                                                                                           (31) Project for flood risk management, Rio Grande de Manati, Puerto Rico.
                                                                                           (32) Project for flood risk management, Rio Guayanilla, Puerto Rico.
                                                                                           (33) Project for flood risk management, Dorchester County, South Carolina.
                                                                                           (34) Project for navigation, Georgetown Harbor, South Carolina.
                                                                                           (35) Project for hurricane and storm damage risk reduction, Myrtle Beach,
                                                                                         South Carolina.
                                                                                           (36) Project to modify the projects for navigation and other purposes, Old
                                                                                         Hickory Lock and Dam and the Cordell Hull Dam and Reservoir, Cumberland
                                                                                         River, Tennessee, authorized by the Act of July 24, 1946 (chapter 595, 60 Stat.
                                                                                         636), to add flood risk management as an authorized purpose.
                                                                                           (37) Project for flood risk management, ecosystem restoration, water supply,
                                                                                         and related purposes, Lower Rio Grande River, Cameron County, Texas, carried
                                                                                         out pursuant to the resolution of the Committee on Transportation and Infra-
                                                                                         structure of the House of Representatives adopted on May 21, 2003 (docket
                                                                                         number 2710).
                                                                                           (38) Project for hurricane and storm damage risk reduction and shoreline ero-
                                                                                         sion protection, Bolongo Bay, St. Thomas, United States Virgin Islands.
                                                                                           (39) Project for flood risk management, Savan Gut Phase II, St. Thomas,
                                                                                         United States Virgin Islands.
                                                                                           (40) Project for flood risk management, Turpentine Run, St. Thomas, United
                                                                                         States Virgin Islands.
                                                                                           (41) Project for navigation, North Landing Bridge, Atlantic Intracoastal Wa-
                                                                                         terway, Virginia.
                                                                                      (b) POST-AUTHORIZATION CHANGE REPORTS.—The Secretary shall expedite comple-
                                                                                   tion of a post-authorization change report for the following projects:
                                                                                           (1) Project for ecosystem restoration, Tres Rios, Arizona.
                                                                                           (2) Project for flood control, San Luis Rey River, California.
                                                                                           (3) Project for ecosystem restoration, Central and Southern Florida Project
                                                                                         Canal 111 (C–111), South Dade County, Florida.
                                                                                           (4) Project for ecosystem restoration, Comprehensive Everglades Restoration
                                                                                         Plan, Caloosahatchee River C–43, West Basin Storage Reservoir, Florida.
                                                                                           (5) Project for flood risk management, Des Moines Levee System, including
                                                                                         Birdland Park Levee, Des Moines and Raccoon Rivers, Des Moines, Iowa.
                                                                                      (c) WATERSHED AND RIVER BASIN ASSESSMENTS.—The Secretary shall expedite the
                                                                                   completion of an assessment under section 729 of the Water Resources Development
                                                                                   Act of 1986 (33 U.S.C. 2267a), for the following:
                                                                                           (1) Kansas River Basin, Kansas.
                                                                                           (2) Merrimack River Basin, Massachusetts.
                                                                                      (d) DISPOSITION STUDY.—The Secretary shall expedite the completion of a disposi-
                                                                                   tion study, carried out under section 216 of the Flood Control Act of 1970 (33 U.S.C.
                                                                                   549a), for the project for Salinas Reservoir (Santa Margarita Lake), California.
                                                                                   SEC. 203. FEASIBILITY STUDY MODIFICATIONS.
                                                                                     (a) SAN FRANCISCO BAY, CALIFORNIA.—Section 142 of the Water Resources Devel-
                                                                                   opment Act of 1976 (90 Stat. 2930) is amended—
                                                                                          (1) by inserting ‘‘, and along the ocean shoreline of San Mateo, San Francisco,




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       and Marin Counties,’’ after ‘‘Sacramento and San Joaquin Rivers’’;
                                                                                          (2) by inserting ‘‘and, with respect to the bay and ocean shorelines of San
                                                                                       Mateo, San Francisco, and Marin Counties, the feasibility of and the Federal




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00025   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      26
                                                                                         interest in providing measures to adapt to rising sea levels’’ after ‘‘tidal and flu-
                                                                                         vial flooding’’;
                                                                                            (3) by striking ‘‘investigation’’ and inserting in its place ‘‘investigations’’; and
                                                                                            (4) by inserting after ‘‘San Francisco Bay region’’ the following: ‘‘and, with re-
                                                                                         spect to the bay and ocean shorelines and streams running to the bay and ocean
                                                                                         shorelines of San Mateo, San Francisco, and Marin Counties, the effects of pro-
                                                                                         posed measures or improvements on the local economy; habitat restoration, en-
                                                                                         hancement, or expansion efforts or opportunities; public infrastructure protec-
                                                                                         tion and improvement; stormwater runoff capacity and control measures, in-
                                                                                         cluding those that may mitigate flooding; erosion of beaches and coasts; and any
                                                                                         other measures or improvements relevant to adapting to rising sea levels’’.
                                                                                      (b) SACRAMENTO RIVER, SOUTHERN SUTTER COUNTY, CALIFORNIA.—The study for
                                                                                   flood control and allied purposes for the Sacramento River Basin, authorized by sec-
                                                                                   tion 209 of the Flood Control Act of 1962 (76 Stat. 1197), is modified to authorize
                                                                                   the Secretary to conduct a study for flood risk management, southern Sutter County
                                                                                   between the Sacramento River and Sutter Bypass, California.
                                                                                      (c) SALTON SEA, CALIFORNIA.—In carrying out the program to implement projects
                                                                                   to restore the Salton Sea, California, authorized by section 3032 of the Water Re-
                                                                                   sources Development Act of 2007 (121 Stat. 1113; 130 Stat. 1677), the Secretary is
                                                                                   authorized to carry out a study for the construction of a perimeter lake, or a north-
                                                                                   ern or southern subset thereof, for the Salton Sea, California.
                                                                                      (d) NEW YORK AND NEW JERSEY HARBOR AND TRIBUTARIES, NEW YORK AND NEW
                                                                                   JERSEY.—The study for flood and storm damage reduction for the New York and
                                                                                   New Jersey Harbor and Tributaries project, authorized by the Act of June 15, 1955
                                                                                   (chapter 140, 69 Stat. 132), and being carried out pursuant to the Disaster Relief
                                                                                   Appropriations Act, 2013 (Public Law 113–2), is modified to require the Secretary
                                                                                   to—
                                                                                            (1) evaluate and address the impacts of low-frequency precipitation and sea-
                                                                                         level rise on the study area;
                                                                                            (2) consult with affected communities; and
                                                                                            (3) ensure the study is carried out in accordance with section 1001 of the
                                                                                         Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282c).
                                                                                   SEC. 204. SELMA, ALABAMA.
                                                                                     Not later than 180 days after the date of enactment of this Act, the Secretary
                                                                                   shall submit to the Committee on Transportation and Infrastructure of the House
                                                                                   of Representatives and the Committee on Environment and Public Works of the
                                                                                   Senate a report that—
                                                                                          (1) provides an update on the study for flood risk management and riverbank
                                                                                       stabilization, Selma, Alabama, authorized by resolutions of the Committees on
                                                                                       Public Works and Rivers and Harbors of the House of Representatives on June
                                                                                       7, 1961, and April 28, 1936, respectively, the completion of which the Secretary
                                                                                       was required to expedite by section 1203 of the Water Resources Development
                                                                                       Act of 2018 (132 Stat. 3803); and
                                                                                          (2) identifies project alternatives necessary to—
                                                                                               (A) assure the preservation of cultural and historic values associated with
                                                                                            national historic landmarks within the study area; and
                                                                                               (B) provide flood risk management for economically disadvantaged com-
                                                                                            munities within the study area.
                                                                                   SEC. 205. COMPREHENSIVE STUDY OF THE SACRAMENTO RIVER, YOLO BYPASS, CALIFORNIA.
                                                                                     (a) COMPREHENSIVE STUDY.—The Secretary shall conduct a comprehensive study
                                                                                   of the Sacramento River in the vicinity of the Yolo Bypass System, California, to
                                                                                   identify actions to be undertaken by the Secretary for the comprehensive manage-
                                                                                   ment of the Yolo Bypass System for the purposes of flood risk management, eco-
                                                                                   system restoration, water supply, hydropower, and recreation.
                                                                                     (b) CONSULTATION AND USE OF EXISTING DATA.—
                                                                                          (1) CONSULTATION.—In conducting the comprehensive study under subsection
                                                                                       (a), the Secretary shall consult with the Governor of the State of California, ap-
                                                                                       plicable Federal, State, and local agencies, non-Federal interests, the Yolo By-
                                                                                       pass and Cache Slough Partnership, and other stakeholders.
                                                                                          (2) USE OF EXISTING DATA AND PRIOR STUDIES.—To the maximum extent prac-
                                                                                       ticable and where appropriate, the Secretary may—
                                                                                               (A) make use of existing data provided to the Secretary by the entities
                                                                                            identified in paragraph (1); and
                                                                                               (B) incorporate—
                                                                                                    (i) relevant information from prior studies and projects carried out by




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                 the Secretary within the study area; and
                                                                                                    (ii) the latest technical data and scientific approaches to changing hy-
                                                                                                 drologic and climatic conditions.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00026   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      27
                                                                                     (c) RECOMMENDATIONS.—
                                                                                          (1) IN GENERAL.—In conducting the comprehensive study under subsection (a),
                                                                                        the Secretary may develop a recommendation to Congress for—
                                                                                               (A) the construction of a water resources development project;
                                                                                               (B) the structural or operational modification of an existing water re-
                                                                                            sources development project;
                                                                                               (C) additional monitoring of, or adaptive management measures to carry
                                                                                            out with respect to, existing water resources development projects, to re-
                                                                                            spond to changing hydrologic and climatic conditions; or
                                                                                               (D) geographic areas within the Yolo Bypass System for additional study
                                                                                            by the Secretary.
                                                                                          (2) ADDITIONAL CONSIDERATIONS.—Any feasibility study carried out pursuant
                                                                                        to a recommendation under paragraph (1)(D) shall be considered to be a con-
                                                                                        tinuation of the comprehensive study authorized under subsection (a).
                                                                                     (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—Not later than 3 years after
                                                                                   the date of enactment of this section, the Secretary shall submit to the Committee
                                                                                   on Transportation and Infrastructure of the House of Representatives and the Com-
                                                                                   mittee on Environment and Public Works of the Senate a report detailing—
                                                                                          (1) the results of the comprehensive study conducted under subsection (a), in-
                                                                                        cluding any recommendations developed under subsection (c);
                                                                                          (2) any additional, site-specific areas within the Yolo Bypass System where
                                                                                        additional study for flood risk management or ecosystem restoration projects is
                                                                                        recommended by the Secretary; and
                                                                                          (3) any interim actions relating to existing water resources development
                                                                                        projects undertaken by the Secretary during the study period.
                                                                                     (e) DEFINITIONS.—In this section:
                                                                                          (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo Bypass System’’ means the system
                                                                                        of weirs, levees, bypass structures, and other water resources development
                                                                                        projects in California’s Sacramento River Valley, extending from the Fremont
                                                                                        Weir near Woodland, California, to the Sacramento River near Rio Vista, Cali-
                                                                                        fornia, authorized pursuant to section 2 of the Act of March 1, 1917 (chapter
                                                                                        144; 39 Stat. 949).
                                                                                          (2) YOLO BYPASS AND CACHE CLOUGH PARTNERSHIP.—The term ‘‘Yolo Bypass
                                                                                        and Cache Slough Partnership’’ means the group of parties to the Yolo Bypass
                                                                                        and Cache Slough Memorandum of Understanding, effective May 2016, regard-
                                                                                        ing collaboration and cooperation in the Yolo Bypass and Cache Slough region.
                                                                                   SEC. 206. LAKE OKEECHOBEE REGULATION SCHEDULE, FLORIDA.
                                                                                      (a) IN GENERAL.—In carrying out the review of the Lake Okeechobee regulation
                                                                                   schedule pursuant to section 1106 of the Water Resources Development Act of 2018
                                                                                   (132 Stat. 3773), the Secretary shall—
                                                                                            (1) evaluate the implications of prohibiting releases from Lake Okeechobee
                                                                                         through the S–308 and S–80 lock and dam structures on the operation of the
                                                                                         lake in accordance with authorized purposes and seek to minimize unnecessary
                                                                                         releases to coastal estuaries; and
                                                                                            (2) to the maximum extent practicable, coordinate with the ongoing efforts of
                                                                                         Federal and State agencies responsible for monitoring, forecasting, and notifica-
                                                                                         tion of cyanobacteria levels in Lake Okeechobee.
                                                                                      (b) MONTHLY REPORT.—Each month, the Secretary shall make public a report,
                                                                                   which may be based on the Water Management Daily Operational Reports, dis-
                                                                                   closing the volumes of water deliveries to or discharges from Lake Okeechobee &
                                                                                   Vicinity, Water Conservation Area I, Water Conservation Area II, Water Conserva-
                                                                                   tion Area III, East Coast Canals, and the South Dade Conveyance. Such report shall
                                                                                   be aggregated and reported in a format designed for the general public, using maps
                                                                                   or other widely understood communication tools.
                                                                                      (c) EFFECT.—In carrying out the evaluation under subsection (a)(1), nothing shall
                                                                                   be construed to authorize any new purpose for the management of Lake Okeechobee
                                                                                   or authorize the Secretary to affect any existing authorized purpose, including flood
                                                                                   protection and management of Lake Okeechobee to provide water supply for all au-
                                                                                   thorized users.
                                                                                   SEC. 207. GREAT LAKES COASTAL RESILIENCY STUDY.
                                                                                     (a) IN GENERAL.—In carrying out the comprehensive assessment of water re-
                                                                                   sources needs for the Great Lakes System under section 729 of the Water Resources
                                                                                   Development Act of 1986 (33 U.S.C. 2267a), as required by section 1219 of the
                                                                                   Water Resources Development Act of 2018 (132 Stat. 3811), the Secretary shall—
                                                                                         (1) taking into account recent high lake levels within the Great Lakes, assess




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       and make recommendations to Congress on—
                                                                                              (A) coastal storm and flood risk management measures, including meas-
                                                                                           ures that use natural features and nature-based features, as those terms




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00027   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      28
                                                                                            are defined in section 1184 of the Water Resources Development Act of
                                                                                            2016 (33 U.S.C. 2289a);
                                                                                               (B) operation and maintenance of the Great Lakes Navigation System, as
                                                                                            such term is defined in section 210 of the Water Resources Development
                                                                                            Act of 1986 (33 U.S.C. 2238);
                                                                                               (C) ecosystem protection and restoration;
                                                                                               (D) the prevention and control of invasive species and the effects of
                                                                                            invasive species; and
                                                                                               (E) recreation associated with water resources development projects;
                                                                                          (2) prioritize actions necessary to protect critical public infrastructure, com-
                                                                                        munities, and critical natural or cultural resources; and
                                                                                          (3) to the maximum extent practicable and where appropriate, utilize existing
                                                                                        data provided to the Secretary by Federal and State agencies, Indian Tribes,
                                                                                        and other stakeholders, including data obtained through other Federal pro-
                                                                                        grams.
                                                                                     (b) RECOMMENDATIONS; ADDITIONAL STUDY.—
                                                                                          (1) IN GENERAL.—In carrying out the comprehensive assessment described in
                                                                                        subsection (a), the Secretary may make a recommendation to Congress for—
                                                                                               (A) the construction of a water resources development project;
                                                                                               (B) the structural or operational modification of an existing water re-
                                                                                            sources development project;
                                                                                               (C) such additional monitoring of, or adaptive management measures to
                                                                                            carry out with respect to, existing water resources development projects, to
                                                                                            respond to changing hydrologic and climatic conditions; or
                                                                                               (D) geographic areas within the Great Lakes System for additional study
                                                                                            by the Secretary.
                                                                                          (2) ADDITIONAL CONSIDERATIONS.—Any feasibility study carried out pursuant
                                                                                        to a recommendation under paragraph (1)(D) shall be considered to be a con-
                                                                                        tinuation of the comprehensive assessment described in subsection (a).
                                                                                     (c) EXEMPTION FROM MAXIMUM STUDY COST AND DURATION LIMITATIONS.—Section
                                                                                   1001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282c)
                                                                                   shall not apply to any study recommended under subsection (b)(1)(D).
                                                                                   SEC. 208. RATHBUN LAKE, CHARITON RIVER, IOWA.
                                                                                     Not later than 1 year after the date of enactment of this Act, the Secretary shall
                                                                                   submit to the Committee on Transportation and Infrastructure of the House of Rep-
                                                                                   resentatives and the Committee on Environment and Public Works of the Senate
                                                                                   a report that evaluates—
                                                                                         (1) the existing allocations of storage space for Rathbun Lake, authorized pur-
                                                                                       suant to the Flood Control Act of 1954 (68 Stat. 1262; 121 Stat. 1124), including
                                                                                       the existing allocation for municipal water supply;
                                                                                         (2) the feasibility of expanding the existing allocation of storage for municipal
                                                                                       water supply; and
                                                                                         (3) the affordability of future municipal water supply allocations from
                                                                                       Rathbun Lake, for residential users of such future allocations, at projected fu-
                                                                                       ture costs.
                                                                                   SEC. 209. REPORT ON THE STATUS OF RESTORATION IN THE LOUISIANA COASTAL AREA.
                                                                                      Not later than 1 year after the date of enactment of this Act, the Coastal Lou-
                                                                                   isiana Ecosystem Protection and Restoration Task Force established by section 7004
                                                                                   of Water Resources Development Act of 2007 (121 Stat. 1272) shall submit to Con-
                                                                                   gress a report that summarizes the activities and recommendations of the task
                                                                                   force, including—
                                                                                           (1) policies, strategies, plans, programs, projects, and activities undertaken for
                                                                                        addressing conservation, protection, restoration, and maintenance of the coastal
                                                                                        Louisiana ecosystem; and
                                                                                           (2) financial participation by each agency represented on the Task Force in
                                                                                        conserving, protecting, restoring, and maintaining the coastal Louisiana eco-
                                                                                        system.
                                                                                   SEC. 210. LOWER MISSISSIPPI RIVER COMPREHENSIVE STUDY.
                                                                                       (a) COMPREHENSIVE STUDY.—
                                                                                            (1) IN GENERAL.—The Secretary shall conduct a comprehensive study of the
                                                                                         Lower Mississippi River basin, from Cape Girardeau, Missouri, to the Gulf of
                                                                                         Mexico, to identify actions to be undertaken by the Secretary for the com-
                                                                                         prehensive management of the basin for the purposes of flood risk management,




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         navigation, ecosystem restoration, water supply, hydropower, and recreation.
                                                                                            (2) FOCUS AREAS.—In conducting the comprehensive study under paragraph
                                                                                         (1), the Secretary shall investigate projects, including—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00028   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      29
                                                                                                (A) projects proposed in the comprehensive coastal protection master plan
                                                                                             entitled ‘‘Louisiana Comprehensive Master Plan for a Sustainable Coast’’
                                                                                             prepared by the State of Louisiana and accepted by the Louisiana Coastal
                                                                                             Protection and Restoration Authority (including any subsequent amend-
                                                                                             ments or revisions), including—
                                                                                                     (i) Ama sediment diversion;
                                                                                                     (ii) Union freshwater diversion;
                                                                                                     (iii) increase Atchafalaya flow to Terrebonne; and
                                                                                                     (iv) Manchac Landbridge diversion; and
                                                                                                (B) natural features and nature-based features, including levee setbacks
                                                                                             and instream and floodplain restoration.
                                                                                      (b) CONSULTATION AND USE OF EXISTING DATA.—In conducting the comprehensive
                                                                                   study under subsection (a), the Secretary shall consult with applicable Federal,
                                                                                   State, and local agencies, Indian Tribes, non-Federal interests, and other stake-
                                                                                   holders, and, to the maximum extent practicable and where appropriate, make use
                                                                                   of existing data provided to the Secretary by such parties.
                                                                                      (c) RECOMMENDATIONS.—
                                                                                           (1) IN GENERAL.—In conducting the comprehensive study under subsection (a),
                                                                                         the Secretary may develop a recommendation to Congress for—
                                                                                                (A) the construction of a water resources development project;
                                                                                                (B) the structural or operational modification of an existing water re-
                                                                                             sources development project;
                                                                                                (C) such additional monitoring of, or adaptive management measures to
                                                                                             carry out with respect to, existing water resources development projects, to
                                                                                             respond to changing conditions; or
                                                                                                (D) geographic areas within the Lower Mississippi River basin for addi-
                                                                                             tional study by the Secretary.
                                                                                           (2) ADDITIONAL CONSIDERATIONS.—Any feasibility study carried out pursuant
                                                                                         to a recommendation under this subsection shall be considered to be a continu-
                                                                                         ation of the comprehensive study required under subsection (a).
                                                                                      (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—Not later than 3 years after
                                                                                   the date of enactment of this section, the Secretary shall submit to the Committee
                                                                                   on Transportation and Infrastructure of the House of Representatives and the Com-
                                                                                   mittee on Environment and Public Works of the Senate a report detailing—
                                                                                           (1) the results of the comprehensive study required by this section, including
                                                                                         any recommendations developed under subsection (c); and
                                                                                           (2) any interim actions relating to existing water resources development
                                                                                         projects undertaken by the Secretary during the study period.
                                                                                   SEC. 211. UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN.
                                                                                     (a) ASSESSMENT.—The Secretary shall conduct an assessment of the water re-
                                                                                   sources needs of the Upper Mississippi River under section 729 of the Water Re-
                                                                                   sources Development Act of 1986 (33 U.S.C. 2267a).
                                                                                     (b) REQUIREMENTS.—The Secretary shall carry out the assessment under sub-
                                                                                   section (a) in accordance with the requirements in section 1206(b) of Water Re-
                                                                                   sources Development Act of 2016 (130 Stat. 1686).
                                                                                   SEC. 212. LOWER MISSOURI BASIN FLOOD RISK AND RESILIENCY STUDY, IOWA, KANSAS, NE-
                                                                                              BRASKA, AND MISSOURI.
                                                                                       (a) ADDITIONAL STUDIES.—
                                                                                            (1) IN GENERAL.—Except as provided in paragraph (2), upon the request of the
                                                                                         non-Federal interest for the Lower Missouri Basin study, the Secretary shall ex-
                                                                                         pand the scope of such study to investigate and provide recommendations relat-
                                                                                         ing to—
                                                                                                 (A) modifications to projects in Iowa, Kansas, Nebraska, and Missouri au-
                                                                                              thorized under the Pick-Sloan Missouri River Basin Program (authorized by
                                                                                              section 9(b) of the Flood Control Act of December 22, 1944 (chapter 665, 58
                                                                                              Stat. 891)) and the Missouri River Bank Stabilization and Navigation
                                                                                              project (authorized by section 2 of the Act of March 2, 1945 (chapter 19,
                                                                                              59 Stat. 19)), including modifications to the authorized purposes of such
                                                                                              projects to further flood risk management and resiliency; and
                                                                                                 (B) modifications to non-Federal, publicly owned levees in the Lower Mis-
                                                                                              souri River Basin.
                                                                                            (2) EXCEPTION.—If the Secretary determines that expanding the scope of the
                                                                                         Lower Missouri Basin study as provided in paragraph (1) is not practicable, and
                                                                                         the non-Federal interest for such study concurs in such determination, the Sec-
                                                                                         retary shall carry out such additional studies as are necessary to investigate the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         modifications described in paragraph (1).
                                                                                            (3) CONTINUATION OF LOWER MISSOURI BASIN STUDY.—The following studies
                                                                                         shall be considered a continuation of the Lower Missouri Basin study:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00029   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      30
                                                                                                (A) Any additional study carried out under paragraph (2).
                                                                                                (B) Any study recommended to be carried out in a report that the Chief
                                                                                             of Engineers prepares for the Lower Missouri Basin study.
                                                                                                (C) Any study recommended to be carried out in a report that the Chief
                                                                                             of Engineers prepares for an additional study carried out under paragraph
                                                                                             (2).
                                                                                                (D) Any study spun off from the Lower Missouri Basin study before the
                                                                                             completion of such study.
                                                                                                (E) Any study spun off from an additional study carried out under para-
                                                                                             graph (2) before the completion of such additional study.
                                                                                           (4) RELIANCE ON EXISTING INFORMATION.—In carrying out any study described
                                                                                        in or authorized by this section, the Secretary, to the extent practicable, shall
                                                                                        rely on existing data and analysis, including data and analysis prepared under
                                                                                        section 22 of the Water Resources Development Act of 1974 (42 U.S.C. 1962d–
                                                                                        16).
                                                                                           (5) CONSIDERATION; CONSULTATION.—In developing recommendations under
                                                                                        paragraph (1), the Secretary shall—
                                                                                                (A) consider the use of—
                                                                                                     (i) structural and nonstructural measures, including the setting back
                                                                                                  of levees and removing structures from areas of recurring flood vulner-
                                                                                                  ability, where advantageous, to reduce flood risk and damages in the
                                                                                                  Lower Missouri River Basin; and
                                                                                                     (ii) where such features are locally acceptable, natural features or na-
                                                                                                  ture-based features (as such terms are defined in section 1184 of the
                                                                                                  Water Resources Development Act of 2016 (33 U.S.C. 2289a); and
                                                                                                (B) consult with applicable Federal and State agencies, Indian Tribes,
                                                                                             and other stakeholders within the Lower Missouri River Basin and solicit
                                                                                             public comment on such recommendations.
                                                                                           (6) EXEMPTION FROM MAXIMUM STUDY COST AND DURATION LIMITATIONS.—Sec-
                                                                                        tion 1001 of the Water Resources Reform and Development Act of 2014 (33
                                                                                        U.S.C. 2282c) shall not apply to the Lower Missouri Basin study or any study
                                                                                        described in paragraph (3).
                                                                                           (7) PRECONSTRUCTION, ENGINEERING, AND DESIGN.—Upon completion of a
                                                                                        study authorized by this section, if the Secretary determines that a rec-
                                                                                        ommended project, or modification to a project described in paragraph (1), is
                                                                                        justified, the Secretary may proceed directly to preconstruction planning, engi-
                                                                                        neering, and design of the project or modification.
                                                                                           (8) TECHNICAL ASSISTANCE.—
                                                                                                (A) IN GENERAL.—For the provision of technical assistance to support
                                                                                             small communities and economically disadvantaged communities in the
                                                                                             planning and design of flood risk management and flood risk resiliency
                                                                                             projects in the Lower Missouri River Basin, for each of fiscal years 2021
                                                                                             through 2026, there are authorized to be appropriated—
                                                                                                     (i) $2,000,000 to carry out section 206 of the Flood Control Act of
                                                                                                  1960 (33 U.S.C. 709a), in addition to amounts otherwise authorized to
                                                                                                  carry out such section; and
                                                                                                     (ii) $2,000,000 to carry out section 22(a)(2) of the Water Resources
                                                                                                  Development Act of 1974 (42 U.S.C. 1962d–16), in addition to amounts
                                                                                                  otherwise authorized to carry out such section.
                                                                                                (B) CONDITIONS.—
                                                                                                     (i) LIMITATIONS NOT APPLICABLE.—The limitations on the use of funds
                                                                                                  in section 206(d) of the Flood Control Act of 1960 and section 22(c)(2)
                                                                                                  of the Water Resources Development Act of 1974 shall not apply to the
                                                                                                  amounts authorized to be appropriated by subparagraph (A).
                                                                                                     (ii) RULE OF CONSTRUCTION.—Nothing in this paragraph restricts the
                                                                                                  authority of the Secretary to use any funds otherwise appropriated to
                                                                                                  carry out section 206 of the Flood Control Act of 1960 or section
                                                                                                  22(a)(2) of the Water Resources Development Act of 1974 to provide
                                                                                                  technical assistance described in subparagraph (A).
                                                                                           (9) COMPLETION OF STUDY; REPORT TO CONGRESS.—Not later than 3 years
                                                                                        after the date of enactment of this Act, the Secretary shall submit to the Com-
                                                                                        mittee on Transportation and Infrastructure of the House of Representatives
                                                                                        and the Committee on Environment and Public Works of the Senate a report
                                                                                        detailing—
                                                                                                (A) the results of the study authorized by this section;




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                (B) any additional, site-specific areas within the Lower Missouri River
                                                                                             Basin for which additional study for flood risk management projects is rec-
                                                                                             ommended by the Secretary; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00030   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      31
                                                                                                 (C) any interim actions relating to existing water resources development
                                                                                              projects undertaken by the Secretary during the study period.
                                                                                       (b) DEFINITIONS.—In this section:
                                                                                            (1) LOWER MISSOURI BASIN STUDY.—The term ‘‘Lower Missouri Basin study’’
                                                                                         means the Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kan-
                                                                                         sas, Nebraska, and Missouri, authorized pursuant to section 216 of the Flood
                                                                                         Control Act of 1970 (33 U.S.C. 549a).
                                                                                            (2) SMALL COMMUNITY.—The term ‘‘small community’’ means a local govern-
                                                                                         ment that serves a population of less than 15,000.
                                                                                   SEC. 213. PORTSMOUTH HARBOR AND PISCATAQUA RIVER AND RYE HARBOR, NEW HAMP-
                                                                                              SHIRE.
                                                                                     Not later than 180 days after the date of enactment of this Act, the Secretary
                                                                                   shall submit to Congress a written status update regarding—
                                                                                          (1) efforts to address the impacts of shoaling affecting the project for naviga-
                                                                                       tion, Rye Harbor, New Hampshire, authorized by section 101 of the River and
                                                                                       Harbor Act of 1960 (74 Stat. 480); and
                                                                                          (2) the project for navigation, Portsmouth Harbor and Piscataqua River, au-
                                                                                       thorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173),
                                                                                       as required to be expedited under section 1317 of the Water Resources Develop-
                                                                                       ment Act of 2018 (Public Law 115–270).
                                                                                   SEC. 214. COUGAR AND DETROIT DAMS, WILLAMETTE RIVER BASIN, OREGON.
                                                                                      (a) REPORT.—Not later than 2 years after the date of enactment of this Act, the
                                                                                   Secretary shall submit to the Committee on Transportation and Infrastructure of
                                                                                   the House of Representatives and the Committee on Environment and Public Works
                                                                                   of the Senate, and make publicly available, a report providing an initial analysis
                                                                                   of deauthorizing hydropower as a project purpose at the Cougar and Detroit Dams
                                                                                   project.
                                                                                      (b) CONTENTS.—The Secretary shall include in the report submitted under sub-
                                                                                   section (a)—
                                                                                           (1) a description of the potential effects of deauthorizing hydropower as a
                                                                                         project purpose at the Cougar and Detroit Dams project on—
                                                                                                (A) the operation of the project, including with respect to the other au-
                                                                                             thorized purposes of the project;
                                                                                                (B) compliance of the project with the Endangered Species Act;
                                                                                                (C) costs that would be attributed to other authorized purposes of the
                                                                                             project, including costs relating to compliance with such Act; and
                                                                                                (D) other ongoing studies in the Willamette River Basin; and
                                                                                           (2) identification of any further research needed.
                                                                                      (c) PROJECT DEFINED.—In this section, the terms ‘‘Cougar and Detroit Dams
                                                                                   project’’ and ‘‘project’’ mean the Cougar Dam and Reservoir project and Detroit Dam
                                                                                   and Reservoir project, Willamette River Basin, Oregon, authorized by section 204
                                                                                   of the Flood Control Act of 1950 (64 Stat. 179).
                                                                                   SEC. 215. PORT ORFORD, OREGON.
                                                                                      Not later than 180 days after the date of enactment of this Act, the Secretary
                                                                                   shall, at Federal expense, submit to the Committee on Transportation and Infra-
                                                                                   structure of the House of Representatives and the Committee on Environment and
                                                                                   Public Works of the Senate a summary report on the research completed and data
                                                                                   gathered by the date of enactment of this Act with regards to the configuration of
                                                                                   a breakwater for the project for navigation, Port Orford, Oregon, authorized by sec-
                                                                                   tion 117 of the River and Harbor Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for
                                                                                   the purposes of addressing shoaling issues to minimize long-term maintenance costs.
                                                                                   SEC. 216. WILSON CREEK AND SLOAN CREEK, FAIRVIEW, TEXAS.
                                                                                     Not later than 180 days after the date of enactment of this section, the Secretary
                                                                                   shall submit to Congress a written status update regarding efforts to address flood-
                                                                                   ing along Wilson Creek and Sloan Creek in the City of Fairview, Texas.
                                                                                   SEC. 217. GAO STUDY ON MITIGATION FOR WATER RESOURCES DEVELOPMENT PROJECTS.
                                                                                    Not later than 18 months after the date of enactment of this Act, the Comptroller
                                                                                   General of the United States shall—
                                                                                        (1) conduct a study on the mitigation of the impact of water resources devel-
                                                                                      opment projects, including the impact on fish and wildlife, consistent with the
                                                                                      requirements of section 906 of the Water Resources Development Act of 1986
                                                                                      (33 U.S.C. 2283), section 307(a) of the Water Resources Development Act of
                                                                                      1990 (33 U.S.C. 2317(a)), and section 2036(b) of the Water Resources Develop-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                      ment Act of 2007 (33 U.S.C. 2283a), including—
                                                                                             (A) an evaluation of guidance or instructions issued, and other measures
                                                                                           taken, by the Secretary to ensure successful mitigation of such impacts;




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00031   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      32
                                                                                                (B) a review of the methods of mitigation, including the use of in-lieu
                                                                                             fees, mitigation banking, and permittee-responsible mitigation, and their
                                                                                             long-term effectiveness of restoring or mitigating ecosystem services im-
                                                                                             pacted by such projects;
                                                                                                (C) a review of how the use of the different mitigation methods for such
                                                                                             projects varies across Corps of Engineers districts;
                                                                                                (D) an assessment of the backlog of mitigation projects, including the
                                                                                             number of mitigation projects pending completion to address such impacts
                                                                                             resulting from constructed water resources development projects;
                                                                                                (E) an evaluation of how the Secretary tracks compliance with the mitiga-
                                                                                             tion requirements across Corps of Engineers districts;
                                                                                                (F) a review of how the mitigation requirements for water resources de-
                                                                                             velopment projects contributes to the resilience of water resources in the
                                                                                             United States;
                                                                                                (G) an assessment of whether mitigation is being done prior to or contem-
                                                                                             poraneously with the construction of projects, as required by section 906 of
                                                                                             the Water Resources Development Act of 1986 (33 U.S.C. 2283);
                                                                                                (H) an evaluation of compliance with section 906(d) of the Water Re-
                                                                                             sources Development Act of 1986 (33 U.S.C. 2283(d)) for the development
                                                                                             of specific mitigation plans for projects, whether such plans were successful
                                                                                             in mitigating the designated impacts of the projects, and, in instances
                                                                                             where such plans were not successful, what actions the Secretary is taking
                                                                                             to modify the plans such that they will be successful; and
                                                                                                (I) an assessment of how the Secretary might take advantage of natural
                                                                                             infrastructure in mitigation planning to reduce flood risks and flood recov-
                                                                                             ery costs for some communities; and
                                                                                           (2) submit to Congress a report that—
                                                                                                (A) describes the results of the study conducted under paragraph (1);
                                                                                                (B) includes recommendations to ensure compliance with and successful
                                                                                             implementation of mitigation requirements for water resources development
                                                                                             projects; and
                                                                                                (C) includes recommendations to ensure existing programs and authori-
                                                                                             ties include the use, to the maximum extent practicable, of natural infra-
                                                                                             structure.
                                                                                   SEC. 218. GAO STUDY ON APPLICATION OF HARBOR MAINTENANCE TRUST FUND EXPENDI-
                                                                                              TURES.
                                                                                     (a) STUDY.—Not later than 18 months after the date of enactment of this Act, the
                                                                                   Comptroller General of the United States shall conduct a study of the operation and
                                                                                   maintenance needs of federally authorized harbor and inland harbor projects, in-
                                                                                   cluding—
                                                                                          (1) an inventory of all federally authorized harbor and inland harbor projects;
                                                                                          (2) an assessment of current uses of such projects (and, to the extent prac-
                                                                                       ticable, the national, regional, and local benefits of such uses), including the
                                                                                       uses listed in section 210(d)(2)(B) of the Water Resources Development Act of
                                                                                       1986;
                                                                                          (3) an assessment of the annual operation and maintenance needs associated
                                                                                       with harbors and inland harbors referred to in subsection (a)(2) of section 210
                                                                                       of the Water Resources Development Act of 1986 (33 U.S.C. 2238), including a
                                                                                       breakdown of such needs for each of the following types of projects—
                                                                                               (A) emerging harbor projects (as defined in such section);
                                                                                               (B) moderate-use harbor projects (as defined in such section on the day
                                                                                            before the date of enactment of this Act);
                                                                                               (C) high-use harbor projects (as defined in such section on the day before
                                                                                            the date of enactment of this Act); and
                                                                                               (D) projects assigned to harbors and inland harbors within the Great
                                                                                            Lakes Navigation System (as defined in such section);
                                                                                          (4) an assessment of any deferred operation and maintenance needs for such
                                                                                       projects;
                                                                                          (5) an assessment of the annual funding level trends for moderate-use harbor
                                                                                       projects (as defined in section 210 of the Water Resources Development Act of
                                                                                       1986 on the day before the date of enactment of this Act) after the date of enact-
                                                                                       ment of the Water Resources Development Act of 2014 (Public Law 113–121),
                                                                                       excluding funds awarded to donor ports, medium-sized donor ports, and energy
                                                                                       transfer ports (as such terms are defined in section 2106 of the Water Resources
                                                                                       Reform and Development Act of 2014 (33 U.S.C. 2201));
                                                                                          (6) an assessment of projected needs associated with donor ports, medium-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       sized donor ports, and energy transfer ports (as such terms are defined in sec-
                                                                                       tion 2106 of the Water Resources Reform and Development Act of 2014 (33
                                                                                       U.S.C. 2201)); and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00032   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      33
                                                                                          (7) an itemization of expenditures provided to donor ports, medium-sized
                                                                                        donor ports, and energy transfer ports under section 2106 of the Water Re-
                                                                                        sources Reform and Development Act of 2014 (33 U.S.C. 2201).
                                                                                     (b) REPORT TO CONGRESS.—Upon completion of the report under subsection (a),
                                                                                   the Comptroller General shall submit such report to the Committee on Transpor-
                                                                                   tation and Infrastructure of the House of Representatives and the Committee on En-
                                                                                   vironment and Public Works of the Senate.
                                                                                   SEC. 219. GAO STUDY ON ADMINISTRATION OF ENVIRONMENTAL BANKS.
                                                                                      (a) IN GENERAL.—Not later than one year after the date of enactment of this Act,
                                                                                   the Comptroller General of the United States shall conduct a study and submit to
                                                                                   the appropriate committees of Congress a report that analyzes the administration
                                                                                   of section 309 of the Coastal Wetlands Planning, Protection and Restoration Act to
                                                                                   establish an environmental bank (as defined in such section), such that the Sec-
                                                                                   retary—
                                                                                           (1) achieves the objectives of the report of the Chief of Engineers for eco-
                                                                                        system restoration in the Louisiana Coastal Area or the objectives of the com-
                                                                                        prehensive coastal protection master plan entitled ‘‘Louisiana Comprehensive
                                                                                        Master Plan for a Sustainable Coast’’ prepared by the State of Louisiana and
                                                                                        accepted by the Louisiana Coastal Protection and Restoration Authority (includ-
                                                                                        ing any subsequent amendments or revisions);
                                                                                           (2) promotes ridge restoration, barrier island restoration, marsh creation, non-
                                                                                        structural risk management, or any other projects authorized, funded, or under-
                                                                                        taken, or proposed to be authorized, funded, or undertaken, pursuant to such
                                                                                        comprehensive coastal protection master plan;
                                                                                           (3) allows for proactive investment in projects by a public or private entity
                                                                                        seeking to generate credits to satisfy responsibilities associated with environ-
                                                                                        mental compliance;
                                                                                           (4) allows for leveraging additional State, Parish, or Federal funds; and
                                                                                           (5) recommends methods for awarding additional credit for high-priority
                                                                                        projects listed in the report and plan described in paragraph (1).
                                                                                      (b) CONSULTATION WITH STAKEHOLDERS.—In carrying out subsection (a), the
                                                                                   Comptroller General of the United States shall consult with the Secretary, the Lou-
                                                                                   isiana Coastal Wetlands Conservation and Restoration Task Force, the Governor of
                                                                                   Louisiana (or an appointee), and other stakeholders, to the extent practicable.
                                                                                   SEC. 220. STUDY ON WATER SUPPLY AND WATER CONSERVATION AT WATER RESOURCES DE-
                                                                                              VELOPMENT PROJECTS.
                                                                                      (a) IN GENERAL.—Not later than 18 months after the date of enactment of this
                                                                                   Act, the Secretary shall submit to the Committee on Transportation and Infrastruc-
                                                                                   ture of the House of the Representatives and the Committee on Environment and
                                                                                   Public Works of the Senate a report that analyzes the benefits and consequences
                                                                                   of including municipal water supply and water conservation as a primary mission
                                                                                   of the Corps of Engineers in carrying out water resources development projects.
                                                                                      (b) INCLUSION.—The Secretary shall include in the report submitted under sub-
                                                                                   section (a)—
                                                                                           (1) a description of existing water resources development projects with munic-
                                                                                        ipal water supply or water conservation as authorized purposes, and the extent
                                                                                        to which such projects are utilized for such purposes;
                                                                                           (2) a description of existing water resources development projects with respect
                                                                                        to which—
                                                                                                (A) municipal water supply or water conservation could be added as a
                                                                                             project purpose, including those with respect to which a non-Federal inter-
                                                                                             est has expressed an interest in adding municipal water supply or water
                                                                                             conservation as a project purpose; and
                                                                                                (B) such a purpose could be accommodated while maintaining existing au-
                                                                                             thorized purposes;
                                                                                           (3) a description of ongoing water resources development project studies the
                                                                                        authorizations for which include authorization for the Secretary to study the
                                                                                        feasibility of carrying out the project with a purpose of municipal water supply
                                                                                        or water conservation;
                                                                                           (4) an analysis of how adding municipal water supply and water conservation
                                                                                        as a primary mission of the Corps of Engineers would affect the ability of the
                                                                                        Secretary to carry out future water resources development projects; and
                                                                                           (5) any recommendations of the Secretary relating to including municipal
                                                                                        water supply and water conservation as a primary mission of the Corps of Engi-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        neers.
                                                                                   SEC. 221. PFAS REVIEW AND INVENTORY AT CORPS FACILITIES.
                                                                                       (a) INVENTORY OF PFAS AT CORPS FACILITIES.—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00033   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      34
                                                                                          (1) IN GENERAL.—Not later than 18 months after the date of enactment of this
                                                                                        section, and annually thereafter the Secretary shall complete an inventory of
                                                                                        Corps of Engineers civil works facilities that are or may be contaminated, or
                                                                                        could become contaminated, by PFAS.
                                                                                          (2) CONTENTS OF INVENTORY.—In carrying out this subsection, the Secretary
                                                                                        shall review and identify—
                                                                                               (A) all facilities owned or operated by the Corps of Engineers, for which
                                                                                             there is a civil works function, that are or may be contaminated, or could
                                                                                             become contaminated, by PFAS;
                                                                                               (B) the nature and extent of any such contamination or potential for con-
                                                                                             tamination, including any potential pathways for human exposure to PFAS;
                                                                                               (C) response measures taken to monitor, control, remove, or remediate
                                                                                             PFAS, or otherwise reduce the risk of human exposure to PFAS;
                                                                                               (D) for facilities identified under subparagraph (A), the extent to which
                                                                                             such facilities (or any such contamination or potential for contamination at
                                                                                             such facilities) are related to the civil works functions of the Corps of Engi-
                                                                                             neers;
                                                                                               (E) the extent to which the Secretary, or other entities, may have respon-
                                                                                             sibility for such contamination or potential for contamination; and
                                                                                               (F) for facilities identified under subparagraph (A), the costs to remediate
                                                                                             and reduce the risk of human exposure to PFAS.
                                                                                          (3) COORDINATION WITH OTHER FEDERAL AGENCIES.—To the maximum extent
                                                                                        practicable, the actions taken under this subsection shall supplement and sup-
                                                                                        port work undertaken by other Federal agencies, including actions taken pursu-
                                                                                        ant to the plan published by the Administrator of the Environmental Protection
                                                                                        Agency, titled ‘‘EPA’s Per- and Polyfluoroalkyl Substances (PFAS) Action Plan’’
                                                                                        and dated February 2019.
                                                                                          (4) REPORT TO CONGRESS.—Upon completion of the inventory under paragraph
                                                                                        (1), and annually thereafter concurrent with the President’s annual budget re-
                                                                                        quest to Congress, the Secretary shall submit the inventory to the Committee
                                                                                        on Transportation and Infrastructure of the House of Representatives and the
                                                                                        Committee on Environment and Public Works of the Senate.
                                                                                     (b) PFAS TECHNOLOGY RESEARCH.—
                                                                                          (1) RESEARCH SUPPORT.—The Secretary, acting through the Hazardous Waste
                                                                                        Research Center located at the Engineer Research and Development Center,
                                                                                        shall, to the maximum extent practicable, support the efforts of other Federal
                                                                                        agencies in the development of innovative technologies and methodologies for
                                                                                        the detection, treatment, and cleanup of PFAS associated with Federal facilities,
                                                                                        including groundwater associated with such facilities.
                                                                                          (2) DUPLICATION OF EFFORTS.—Nothing in this subsection is intended to dupli-
                                                                                        cate the activities undertaken by other Federal agencies as identified in sub-
                                                                                        section (a)(3).
                                                                                     (c) DEFINITION.—In this section, the term ‘‘PFAS’’ means a perfluoroalkyl sub-
                                                                                   stance or polyfluoroalkyl substance with at least one fully fluorinated carbon atom.
                                                                                   SEC. 222. REPORT ON RECREATIONAL FACILITIES.
                                                                                     No later than 18 months after the date of enactment of this Act, the Secretary
                                                                                   shall submit to the Committee on Transportation and Infrastructure of the House
                                                                                   of Representatives and the Committee on Environment and Public Works of the
                                                                                   Senate a report that contains—
                                                                                          (1) an inventory of all recreational infrastructure and facilities associated
                                                                                       with water resources development projects;
                                                                                          (2) an assessment of the annual operation and maintenance needs associated
                                                                                       with such infrastructure and facilities;
                                                                                          (3) an assessment of deferred operation and maintenance needs for such in-
                                                                                       frastructure and facilities to operate safely at full capacity; and
                                                                                          (4) an assessment of the economic benefits of recreation to local and regional
                                                                                       economies and benefits of sustaining and improving public access at rec-
                                                                                       reational infrastructure and facilities.

                                                                                               TITLE III—DEAUTHORIZATIONS AND
                                                                                                         MODIFICATIONS
                                                                                   SEC. 301. DEAUTHORIZATION OF INACTIVE PROJECTS.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       (a) PURPOSES.—The purposes of this section are—
                                                                                            (1) to identify water resources development projects authorized by Congress
                                                                                         that are no longer viable for construction due to—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00034   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      35
                                                                                                 (A) a lack of local support;
                                                                                                 (B) a lack of available Federal or non-Federal resources; or
                                                                                                 (C) an authorizing purpose that is no longer relevant or feasible;
                                                                                            (2) to create an expedited and definitive process for Congress to deauthorize
                                                                                         water resources development projects that are no longer viable for construction;
                                                                                         and
                                                                                            (3) to allow the continued authorization of water resources development
                                                                                         projects that are viable for construction.
                                                                                       (b) PROPOSED DEAUTHORIZATION LIST.—
                                                                                            (1) PRELIMINARY LIST OF PROJECTS.—
                                                                                                 (A) IN GENERAL.—The Secretary shall develop a preliminary list of each
                                                                                              water resources development project, or separable element of a project, au-
                                                                                              thorized for construction before November 8, 2007, for which—
                                                                                                      (i) planning, design, or construction was not initiated before the date
                                                                                                   of enactment of this Act; or
                                                                                                      (ii) planning, design, or construction was initiated before the date of
                                                                                                   enactment of this Act, but for which no funds, Federal or non-Federal,
                                                                                                   were obligated for planning, design, or construction of the project or
                                                                                                   separable element of the project during the current fiscal year or any
                                                                                                   of the 10 preceding fiscal years.
                                                                                                 (B) USE OF COMPREHENSIVE CONSTRUCTION BACKLOG AND OPERATION AND
                                                                                              MAINTENANCE REPORT.—The Secretary may develop the preliminary list
                                                                                              from the comprehensive construction backlog and operation and mainte-
                                                                                              nance reports developed pursuant to section 1001(b)(2) of the Water Re-
                                                                                              sources Development Act of 1986 (33 U.S.C. 579a).
                                                                                            (2) PREPARATION OF PROPOSED DEAUTHORIZATION LIST.—
                                                                                                 (A) DEAUTHORIZATION AMOUNT.—The Secretary shall prepare a proposed
                                                                                              list of projects for deauthorization comprised of a subset of projects and sep-
                                                                                              arable elements identified on the preliminary list developed under para-
                                                                                              graph (1) that have, in the aggregate, an estimated Federal cost to complete
                                                                                              that is at least $10,000,000,000.
                                                                                                 (B) DETERMINATION OF FEDERAL COST TO COMPLETE.—For purposes of
                                                                                              subparagraph (A), the Federal cost to complete shall take into account any
                                                                                              allowances authorized by section 902 of the Water Resources Development
                                                                                              Act of 1986 (33 U.S.C. 2280), as applied to the most recent project schedule
                                                                                              and cost estimate.
                                                                                                 (C) INCLUSION OF DEAUTHORIZATION OF ANTIQUATED PROJECTS.—The Sec-
                                                                                              retary shall reduce the amount identified for deauthorization under para-
                                                                                              graph (2)(A) by an amount equivalent to the estimated current value of
                                                                                              each project, or separable element of a project, that is deauthorized by sub-
                                                                                              section (f).
                                                                                            (3) SEQUENCING OF PROJECTS.—
                                                                                                 (A) IN GENERAL.—The Secretary shall identify projects and separable ele-
                                                                                              ments for inclusion on the proposed list of projects for deauthorization
                                                                                              under paragraph (2) according to the order in which the projects and sepa-
                                                                                              rable elements were authorized, beginning with the earliest authorized
                                                                                              projects and separable elements and ending with the latest project or sepa-
                                                                                              rable element necessary to meet the aggregate amount under paragraph
                                                                                              (2)(A).
                                                                                                 (B) FACTORS TO CONSIDER.—The Secretary may identify projects and sep-
                                                                                              arable elements in an order other than that established by subparagraph
                                                                                              (A) if the Secretary determines, on a case-by-case basis, that a project or
                                                                                              separable element is critical for interests of the United States, based on the
                                                                                              possible impact of the project or separable element on public health and
                                                                                              safety, the national economy, or the environment.
                                                                                            (4) PUBLIC COMMENT AND CONSULTATION.—
                                                                                                 (A) IN GENERAL.—The Secretary shall solicit comments from the public
                                                                                              and the Governors of each applicable State on the proposed deauthorization
                                                                                              list prepared under paragraph (2)(A).
                                                                                                 (B) COMMENT PERIOD.—The public comment period shall be 90 days.
                                                                                            (5) PREPARATION OF FINAL DEAUTHORIZATION LIST.—
                                                                                                 (A) IN GENERAL.—The Secretary shall prepare a final deauthorization list
                                                                                              by—
                                                                                                      (i) considering any comments received under paragraph (4); and
                                                                                                      (ii) revising the proposed deauthorization list prepared under para-
                                                                                                   graph (2)(A) as the Secretary determines necessary to respond to such




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                   comments.
                                                                                                 (B) APPENDIX.—The Secretary shall include as part of the final deauthor-
                                                                                              ization list an appendix that—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00035   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      36
                                                                                                     (i) identifies each project or separable element on the proposed de-
                                                                                                  authorization list that is not included on the final deauthorization list;
                                                                                                  and
                                                                                                     (ii) describes the reasons why the project or separable element is not
                                                                                                  included on the final deauthorization list.
                                                                                     (c) SUBMISSION OF FINAL DEAUTHORIZATION LIST TO CONGRESS FOR CONGRES-
                                                                                   SIONAL REVIEW; PUBLICATION.—
                                                                                           (1) IN GENERAL.—Not later than 90 days after the date of the close of the com-
                                                                                        ment period under subsection (b)(4), the Secretary shall—
                                                                                                (A) submit the final deauthorization list and appendix prepared under
                                                                                             subsection (b)(5) to the Committee on Transportation and Infrastructure of
                                                                                             the House of Representatives and the Committee on Environment and Pub-
                                                                                             lic Works of the Senate; and
                                                                                                (B) publish the final deauthorization list and appendix in the Federal
                                                                                             Register.
                                                                                           (2) EXCLUSIONS.—The Secretary shall not include in the final deauthorization
                                                                                        list submitted under paragraph (1) any project or separable element with re-
                                                                                        spect to which Federal funds for planning, design, or construction are obligated
                                                                                        after the development of the preliminary list under subsection (b)(1)(A) but
                                                                                        prior to the submission of the final deauthorization list under paragraph (1)(A)
                                                                                        of this subsection.
                                                                                     (d) DEAUTHORIZATION; CONGRESSIONAL REVIEW.—
                                                                                           (1) IN GENERAL.—After the expiration of the 2-year period beginning on the
                                                                                        date of publication of the final deauthorization list and appendix under sub-
                                                                                        section (c)(1)(B), a project or separable element of a project identified in the
                                                                                        final deauthorization list is hereby deauthorized, unless Congress passes a joint
                                                                                        resolution disapproving the final deauthorization list prior to the end of such
                                                                                        period.
                                                                                           (2) NON-FEDERAL CONTRIBUTIONS.—
                                                                                                (A) IN GENERAL.—A project or separable element of a project identified in
                                                                                             the final deauthorization list under subsection (c) shall not be deauthorized
                                                                                             under this subsection if, before the expiration of the 2-year period referred
                                                                                             to in paragraph (1), the non-Federal interest for the project or separable
                                                                                             element of the project provides sufficient funds to complete the project or
                                                                                             separable element of the project.
                                                                                                (B) TREATMENT OF PROJECTS.—Notwithstanding subparagraph (A), each
                                                                                             project and separable element of a project identified in the final deauthor-
                                                                                             ization list shall be treated as deauthorized for purposes of the aggregate
                                                                                             deauthorization amount specified in subsection (b)(2)(A).
                                                                                           (3) PROJECTS IDENTIFIED IN APPENDIX.—A project or separable element of a
                                                                                        project identified in the appendix to the final deauthorization list shall remain
                                                                                        subject to future deauthorization by Congress.
                                                                                     (e) SPECIAL RULES.—
                                                                                           (1) POST-AUTHORIZATION STUDIES.—A project or separable element of a project
                                                                                        may not be identified on the proposed deauthorization list developed under sub-
                                                                                        section (b), or the final deauthorization list developed under subsection (c), if
                                                                                        the project or separable element received funding for a post-authorization study
                                                                                        during the current fiscal year or any of the 10 preceding fiscal years.
                                                                                           (2) TREATMENT OF PROJECT MODIFICATIONS.—For purposes of this section, if
                                                                                        an authorized water resources development project or separable element of the
                                                                                        project has been modified by an Act of Congress, the date of the authorization
                                                                                        of the project or separable element shall be deemed to be the date of the most
                                                                                        recent such modification.
                                                                                     (f) DEAUTHORIZATION OF ANTIQUATED PROJECTS.—
                                                                                           (1) IN GENERAL.—Any water resources development project, or separable ele-
                                                                                        ment of a project, authorized for construction prior to November 17, 1986, for
                                                                                        which construction has not been initiated prior to the date of enactment of this
                                                                                        Act, or for which funds have not been obligated for construction in the 10-year
                                                                                        period prior to the date of enactment of this Act, is hereby deauthorized.
                                                                                           (2) IDENTIFICATION.—Not later than 60 days after the date of enactment of
                                                                                        this Act, the Secretary shall issue to the Committee on Transportation and In-
                                                                                        frastructure of the House of Representatives and the Committee on Environ-
                                                                                        ment and Public Works of the Senate a report that identifies—
                                                                                                (A) the name of each project, or separable element of a project, deauthor-
                                                                                             ized by paragraph (1); and
                                                                                                (B) the estimated current value of each such project or separable element




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                             of a project.
                                                                                     (g) ECONOMIC AND ENVIRONMENTAL REVIEW OF INACTIVE WATER RESOURCES DE-
                                                                                   VELOPMENT PROJECTS.—The Secretary or the non-Federal interest may not carry out




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00036   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      37
                                                                                   any authorized water resources development project, or separable element of such
                                                                                   project, for which construction has not been initiated in the 20-year period following
                                                                                   the date of the authorization of such project or separable element, until—
                                                                                          (1) the Secretary provides to the Committee on Transportation and Infrastruc-
                                                                                       ture of the House of Representatives and the Committee on Environment and
                                                                                       Public Works of the Senate a post-authorization change report that updates the
                                                                                       economic and environmental analysis of the project or separable element; and
                                                                                          (2) the Committee on Transportation and Infrastructure of the House of Rep-
                                                                                       resentatives and the Committee on Environment and Public Works of the Sen-
                                                                                       ate take appropriate action to address any modifications to the economic and
                                                                                       environmental analysis for the project or separable element of the project con-
                                                                                       tained in the post-authorization change report.
                                                                                     (h) DEFINITIONS.—In this section:
                                                                                          (1) POST-AUTHORIZATION CHANGE REPORT.—The term ‘‘post-authorization
                                                                                       change report’’ has the meaning given such term in section 1132(d) of the Water
                                                                                       Resources Development Act of 2016 (33 U.S.C. 2282e).
                                                                                          (2) POST-AUTHORIZATION STUDY.—The term ‘‘post-authorization study’’
                                                                                       means—
                                                                                               (A) a feasibility report developed under section 905 of the Water Re-
                                                                                             sources Development Act of 1986 (33 U.S.C. 2282);
                                                                                               (B) a feasibility study, as defined in section 105(d) of the Water Resources
                                                                                             Development Act of 1986 (33 U.S.C. 2215(d)); or
                                                                                               (C) a review conducted under section 216 of the Flood Control Act of 1970
                                                                                             (33 U.S.C. 549a), including an initial appraisal that—
                                                                                                   (i) demonstrates a Federal interest; and
                                                                                                   (ii) requires additional analysis for the project or separable element.
                                                                                          (3) WATER RESOURCES DEVELOPMENT PROJECT.—The term ‘‘water resources
                                                                                       development project’’ includes an environmental infrastructure assistance
                                                                                       project or program of the Corps of Engineers.
                                                                                   SEC. 302. ABANDONED AND INACTIVE NONCOAL MINE RESTORATION.
                                                                                      Section 560(f) of the Water Resources Development Act of 1999 (33 U.S.C. 2336(f))
                                                                                   is amended by striking ‘‘$20,000,000’’ and inserting ‘‘$30,000,000’’.
                                                                                   SEC. 303. TRIBAL PARTNERSHIP PROGRAM.
                                                                                      Section 203(b)(4) of the Water Resources Development Act of 2000 (33 U.S.C.
                                                                                   2269) is amended by striking ‘‘$12,500,000’’ each place it appears and inserting
                                                                                   ‘‘$15,000,000’’.
                                                                                   SEC. 304. LAKES PROGRAM.
                                                                                     Section 602(a) of the Water Resources Development Act of 1986 (Public Law 99–
                                                                                   662, 100 Stat. 4148; 110 Stat. 3758; 113 Stat. 295; 121 Stat. 1076) is amended—
                                                                                         (1) in paragraph (27), by striking ‘‘and’’ at the end;
                                                                                         (2) in paragraph (28), by striking the period at the end and inserting a semi-
                                                                                       colon; and
                                                                                         (3) by adding at the end the following:
                                                                                         ‘‘(29) Ellis Pond and Guild Pond, Norwood, Massachusetts; and
                                                                                         ‘‘(30) Memorial Pond, Walpole, Massachusetts.’’.
                                                                                   SEC. 305. WATERCRAFT INSPECTION STATIONS.
                                                                                      Section 104(d)(1)(A) of the River and Harbor Act of 1958 (33 U.S.C. 610(d)(1)(A))
                                                                                   is amended—
                                                                                          (1) in clause (ii), by striking ‘‘; and’’ and inserting a semicolon;
                                                                                          (2) in clause (iii), by striking ‘‘Arizona River Basins.’’ and inserting ‘‘Arkansas
                                                                                        River Basins; and’’; and
                                                                                          (3) by adding at the end the following:
                                                                                                    ‘‘(iv) to protect the Russian River Basin, California.’’.
                                                                                   SEC. 306. CHESAPEAKE BAY ENVIRONMENTAL RESTORATION AND PROTECTION PROGRAM.
                                                                                     (a) IN GENERAL.—Section 510 of the Water Resources Development Act of 1996
                                                                                   (Public Law 104–303, 110 Stat. 3759; 121 Stat. 1202; 128 Stat. 1317) is amended—
                                                                                           (1) by redesignating subsection (h) as subsection (i) and inserting after sub-
                                                                                        section (g) the following:
                                                                                     ‘‘(h) PROJECT CAP.—The total cost of a project carried out under this section may
                                                                                   not exceed $15,000,000.’’; and
                                                                                           (2) in subsection (i) (as so redesignated), by striking ‘‘$40,000,000’’ and insert-
                                                                                        ing ‘‘$60,000,000’’.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     (b) OUTREACH AND TRAINING.—The Secretary shall conduct public outreach and
                                                                                   workshops for non-Federal interests to provide information on the Chesapeake Bay
                                                                                   environmental restoration and protection program established under section 510 of




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00037   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      38
                                                                                   the Water Resources Development Act of 1996, including how to participate in the
                                                                                   program.
                                                                                   SEC. 307. UPPER MISSISSIPPI RIVER SYSTEM ENVIRONMENTAL MANAGEMENT PROGRAM.
                                                                                     Section 1103(e)(3) of the Water Resources Development Act of 1986 (33 U.S.C.
                                                                                   652(e)(3)) is amended by striking ‘‘$22,750,000’’ and inserting ‘‘$40,000,000’’.
                                                                                   SEC. 308. MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM.
                                                                                     Any Federal funds, regardless of the account from which the funds were provided,
                                                                                   used to carry out construction of the modification to the McClellan-Kerr Arkansas
                                                                                   River Navigation System, authorized in section 136 of the Energy and Water Devel-
                                                                                   opment Appropriations Act, 2004 (117 Stat. 1842), shall be considered by the Sec-
                                                                                   retary as initiating construction of the project such that future funds will not re-
                                                                                   quire a new investment decision.
                                                                                   SEC. 309. OUACHITA-BLACK RIVER NAVIGATION PROJECT, ARKANSAS.
                                                                                     The project for navigation, Ouachita-Black River, Arkansas, authorized by section
                                                                                   101 of the River and Harbor Act of 1960 (Public Law 86–645), is modified to include
                                                                                   water supply as a project purpose, subject to completion by the Secretary of a feasi-
                                                                                   bility study and any other review necessary for such modification.
                                                                                   SEC. 310. SACRAMENTO RIVER, GLENN-COLUSA, CALIFORNIA.
                                                                                     The portion of project for flood control, Sacramento River, California, authorized
                                                                                   by section 2 of the Act of March 1, 1917 (chapter 144, 39 Stat. 949; 103 Stat. 649;
                                                                                   110 Stat. 3709; 112 Stat. 1841; 113 Stat. 299), consisting of a riverbed gradient res-
                                                                                   toration facility at the Glenn-Colusa Irrigation District Intake, is no longer author-
                                                                                   ized beginning on the date of enactment of this Act.
                                                                                   SEC. 311. LAKE ISABELLA, CALIFORNIA.
                                                                                      (a) SENSE OF CONGRESS.—It is the sense of Congress that the Secretary, when
                                                                                   evaluating alternative locations for construction of a permanent Isabella Lake Vis-
                                                                                   itor Center by the Corps of Engineers to replace the facility impacted by the Isabella
                                                                                   Dam safety modification project, should afford substantial weight to the site pref-
                                                                                   erence of the local community.
                                                                                      (b) AUTHORITY.—The Secretary may acquire such interests in real property as the
                                                                                   Secretary determines necessary or advisable to support construction of the Isabella
                                                                                   Dam safety modification project.
                                                                                      (c) TRANSFER.—The Secretary may transfer any real property interests acquired
                                                                                   under subsection (b) to any other Federal agency or department without reimburse-
                                                                                   ment.
                                                                                      (d) ISABELLA DAM SAFETY MODIFICATION PROJECT DEFINED.—In this section, the
                                                                                   term ‘‘Isabella Dam safety modification project’’ means the dam safety modification
                                                                                   project at the Isabella Reservoir in the San Joaquin Valley, California (authorized
                                                                                   by Act of December 22, 1944 (chapter 665, 58 Stat. 901)), including the component
                                                                                   of the project relating to construction a visitor center facility.
                                                                                   SEC. 312. LOWER SAN JOAQUIN RIVER FLOOD CONTROL PROJECT.
                                                                                     The Secretary shall align the schedules of, and maximize complimentary efforts,
                                                                                   minimize duplicative practices, and ensure coordination and information sharing
                                                                                   with respect to—
                                                                                          (1) the project for flood risk management, Lower San Joaquin River, author-
                                                                                       ized by section 1401(2) of the Water Resources Development Act of 2018 (132
                                                                                       Stat. 3836); and
                                                                                          (2) the second phase of the feasibility study for the Lower San Joaquin River
                                                                                       project for flood risk management, authorized for expedited completion by sec-
                                                                                       tion 1203(a)(7) of the Water Resources Development Act 2018 (132 Stat. 3803).
                                                                                   SEC. 313. SAN DIEGO RIVER AND MISSION BAY, SAN DIEGO COUNTY, CALIFORNIA.
                                                                                     The portion of the project for flood control and navigation, San Diego River and
                                                                                   Mission Bay, San Diego County, California, authorized by the Act of July 24, 1946
                                                                                   (chapter 595, 60 Stat. 636), identified in the National Levee Database established
                                                                                   under section 9004 of the Water Resources Development Act of 2007 (33 U.S.C.
                                                                                   3303) as the San Diego River 3 segment and consisting of a 785-foot-long segment
                                                                                   of the right bank levee from Station 209+41.75 to its end at Station 217+26.75, as
                                                                                   described in construction plans dated August 30, 1951, is no longer authorized be-
                                                                                   ginning on the date of enactment of this Act.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   SEC. 314. SAN FRANCISCO, CALIFORNIA, WATERFRONT AREA.
                                                                                      (a) IN GENERAL.—Section 114 of the River and Harbor Act of 1968 (33 U.S.C. 59h)
                                                                                   is amended to read as follows:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00038   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      39
                                                                                   ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATERFRONT AREA.
                                                                                      ‘‘(a) AREA TO BE DECLARED NONNAVIGABLE.—The following area is declared to be
                                                                                   nonnavigable waters of the United States: All of that portion of the City and County
                                                                                   of San Francisco, California, lying shoreward of a line beginning at the intersection
                                                                                   of the southerly right of way line of Earl Street prolongation with the Pierhead
                                                                                   United States Government Pierhead line, the Pierhead line as defined in the State
                                                                                   of California Harbor and Navigation Code Section 1770, as amended in 1961; thence
                                                                                   northerly along said Pierhead line to its intersection with a line parallel with and
                                                                                   distant 10 feet easterly from, the existing easterly boundary line of Pier 30–32;
                                                                                   thence northerly along said parallel line and its northerly prolongation, to a point
                                                                                   of intersection with a line parallel with, and distant 10 feet northerly from, the ex-
                                                                                   isting northerly boundary of Pier 30–32; thence westerly along last said parallel line
                                                                                   to its intersection with said Pierhead line; thence northerly along said Pierhead line,
                                                                                   to the intersection of the easterly right of way line of Van Ness Avenue, formerly
                                                                                   Marlette Street, prolongation to the Pierhead line.
                                                                                      ‘‘(b) REQUIREMENT THAT AREA BE IMPROVED.—The declaration of nonnavigability
                                                                                   under subsection (a) applies only to those parts of the area described in subsection
                                                                                   (a) that are or will be bulkheaded, filled, or otherwise occupied or covered by perma-
                                                                                   nent structures and does not affect the applicability of any Federal statute or regu-
                                                                                   lation that relates to filling of navigable waters or to other regulated activities with-
                                                                                   in the area described in subsection (a), including sections 9 and 10 of the Act of
                                                                                   March 3, 1899 (33 U.S.C. 401, 403), section 404 of the Federal Water Pollution Con-
                                                                                   trol Act, and the National Environmental Policy Act of 1969.
                                                                                      ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC DISTRICT.—Congress finds and de-
                                                                                   clares that the area described in subsection (a) contains the seawall, piers, and
                                                                                   wharves that comprise the Embarcadero Historic District listed on the National
                                                                                   Register of Historic Places on May 12, 2006.’’.
                                                                                      (b) CONFORMING AMENDMENT.—Section 5052 of the Water Resources Development
                                                                                   Act of 2007 (33 U.S.C. 59h–1) is repealed.
                                                                                   SEC. 315. WESTERN PACIFIC INTERCEPTOR CANAL, SACRAMENTO RIVER, CALIFORNIA.
                                                                                     The portion of the project for flood protection on the Sacramento River, authorized
                                                                                   by section 2 of the of March 1, 1917 (chapter 144, 39 Stat. 949; 45 Stat. 539; 50
                                                                                   Stat. 877; 55 Stat. 647; 80 Stat. 1422), consisting of the portion of the levee from
                                                                                   GPS coordinate N2147673.584 E6690904.187 to N2147908.413 E6689057.060 associ-
                                                                                   ated with the Western Pacific Interceptor Canal, is no longer authorized beginning
                                                                                   on the date of the enactment of this Act.
                                                                                   SEC. 316. RIO GRANDE ENVIRONMENTAL MANAGEMENT PROGRAM, COLORADO, NEW MEXICO,
                                                                                              AND TEXAS.
                                                                                      Section 5056(f) of the Water Resources Development Act of 2007 (Public Law 110–
                                                                                   114, 121 Stat. 1213; 128 Stat. 1314) is amended by striking ‘‘2019’’ and inserting
                                                                                   ‘‘2029’’.
                                                                                   SEC. 317. NEW LONDON HARBOR WATERFRONT CHANNEL, CONNECTICUT.
                                                                                      (a) IN GENERAL.—The portion of the project for navigation, New London Harbor,
                                                                                   Connecticut, authorized by the first section of the Act of June 13, 1902 (chapter
                                                                                   1079, 32 Stat. 333), described in subsection (b) is no longer authorized beginning
                                                                                   on the date of enactment of this Act.
                                                                                      (b) AREA DESCRIBED.—The area referred to in subsection (a) is generally the por-
                                                                                   tion between and around the 2 piers at the State Pier in New London, specifically
                                                                                   the area—
                                                                                           (1) beginning at a point N691263.78, E1181259.26;
                                                                                           (2) running N 35°01’50.75’’ W about 955.59 feet to a point N692046.26,
                                                                                        E1180710.74;
                                                                                           (3) running N 54°58’06.78’’ E about 100.00 feet to a point N692103.66,
                                                                                        E1180792.62;
                                                                                           (4) running S 35°01’50.75’’ E about 989.8 feet to a point N691293.17,
                                                                                        E1181360.78; and
                                                                                           (5) running S 73°51’15.45’’ W about 105.69 feet to the point described in para-
                                                                                        graph (1).
                                                                                   SEC. 318. WASHINGTON HARBOR, DISTRICT OF COLUMBIA.
                                                                                      Beginning on the date of enactment of this Act, the project for navigation, Wash-
                                                                                   ington Harbor, District of Columbia, authorized by the Act of August 30, 1935 (chap-
                                                                                   ter 831, 49 Stat. 1031), is modified to reduce, in part, the authorized dimensions
                                                                                   of the project, such that the remaining authorized dimensions are as follows:
                                                                                          (1) A 200 foot wide, 15 foot deep channel with a center line beginning at a




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        point East 1,317,064.30 and North 440,373.32, thence to a point East
                                                                                        1,316,474.30 and North 440,028.31, thence to a point East 1,315,584.30 and
                                                                                        North 439,388.30, thence to a point East 1,315,259.31 and North 438,908.30.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00039   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      40
                                                                                          (2) A transition area 200 foot wide to 300 foot wide, 15 foot deep, with a cen-
                                                                                        ter line beginning at a point East 1,315,259.31 and North 438,908.30 to a point
                                                                                        East 1,315,044.31 and North 438,748.30.
                                                                                          (3) A 300 foot wide, 15 foot deep channel with a centerline beginning a point
                                                                                        East 1,315,044.31 and North 438,748.30, thence to a point East 1,314,105.31
                                                                                        and North 438,124.79, thence to a point East 1,311,973.30 and North
                                                                                        438,807.78, thence to a point East 1,311,369.73 and North 438,577.42, thence
                                                                                        to a point East 1,311,015.73 and North 438,197.57, thence to a point East
                                                                                        1,309,713.47 and North 435,678.91.
                                                                                          (4) A transition area 300 foot wide to 400 foot wide, 15 foot deep to 24 foot
                                                                                        deep, with a center line beginning at a point East 1,309,713.47 and North
                                                                                        435,678.91 to a point East 1,307,709.33 and North 434,488.25.
                                                                                          (5) A 400 foot wide, 24 foot deep channel with a centerline beginning at a
                                                                                        point East 1,307,709.33 and North 434,488.25, thence to a point East
                                                                                        1,307,459.33 and North 434,173.25, thence to a point East 1,306,476.82 and
                                                                                        North 1,306,476.82, thence to a point East 1,306,209.79 and North 431,460.21,
                                                                                        thence to a point at the end of the channel near Hains Point East 1,305,997.63
                                                                                        and North 429,978.31.
                                                                                   SEC. 319. CENTRAL EVERGLADES, FLORIDA.
                                                                                      The project for ecosystem restoration, Central Everglades, authorized by section
                                                                                   1401(4) of the Water Resources Development Act of 2016 (130 Stat. 1713), is modi-
                                                                                   fied to include the project for ecosystem restoration, Central and Southern Florida,
                                                                                   Everglades Agricultural Area, authorized by section 1308 of the Water Resources
                                                                                   Development Act of 2018 (132 Stat. 3819), and to authorize the Secretary to carry
                                                                                   out the project as so combined.
                                                                                   SEC. 320. MIAMI RIVER, FLORIDA.
                                                                                     The portion of the project for navigation, Miami River, Florida, authorized by the
                                                                                   Act of July 3, 1930 (46 Stat. 925; 59 Stat. 16; 74 Stat. 481; 100 Stat. 4257), begin-
                                                                                   ning at the existing railroad bascule bridge and extending approximately 1,000 lin-
                                                                                   ear feet upstream to an existing salinity barrier and flood control structure, is no
                                                                                   longer authorized beginning on the date of enactment of this Act.
                                                                                   SEC. 321. TAYLOR CREEK RESERVOIR AND LEVEE L–73 (SECTION 1), UPPER ST. JOHNS RIVER
                                                                                              BASIN, FLORIDA.
                                                                                     The portions of the project for flood control and other purposes, Central and
                                                                                   Southern Florida, authorized by section 203 of the Flood Control Act of 1948 (62
                                                                                   Stat. 1176), consisting of the Taylor Creek Reservoir and Levee L–73, Section 1,
                                                                                   within the Upper St. Johns River Basin, Florida, are no longer authorized beginning
                                                                                   on the date of enactment of this Act.
                                                                                   SEC. 322. CALCASIEU RIVER AND PASS, LOUISIANA.
                                                                                     Not later than 120 days after the date of enactment of this Act, the Secretary
                                                                                   shall provide to the Committee on Transportation and Infrastructure of the House
                                                                                   of Representatives and the Committee on Environment and Public Works of the
                                                                                   Senate a report on plans to modify the Calcasieu River and Pass Dredged Material
                                                                                   Management Plan and Supplemental Environmental Impact Statement (December
                                                                                   16, 2010 DMMP/SEIS) to allow for the expansion of Dredged Material Placement
                                                                                   Facilities (DMPFs) 17, 19, 22, D, and E to the lakeside foreshore rock boundaries
                                                                                   during planned rehabilitation of these facilities.
                                                                                   SEC. 323. SAN JUAN-CHAMA PROJECT; ABIQUIU DAM, NEW MEXICO.
                                                                                      (a) ABIQUIU RESERVOIR.—Section 5(b) of Public Law 97–140 (43 U.S.C. 620a note)
                                                                                   is amended by striking ‘‘a total of two hundred thousand acre-feet of’’.
                                                                                      (b) WATER STORAGE AT ABIQUIU DAM, NEW MEXICO.—Section 1 of Public Law
                                                                                   100–522 (43 U.S.C. 620a note) is amended—
                                                                                           (1) by striking ‘‘200,000 acre-feet of’’;
                                                                                           (2) by inserting ‘‘and San Juan-Chama project’’ after ‘‘Rio Grande system’’;
                                                                                         and
                                                                                           (3) by striking ‘‘, in lieu of the water storage authorized by section 5 of Public
                                                                                         Law 97–140, to the extent that contracting entities under section 5 of Public
                                                                                         Law 97–140 no longer require such storage’’.
                                                                                      (c) WATER STORAGE.—The Secretary shall—
                                                                                           (1) store up to elevation 6230.00 NGVD29 at Abiquiu Dam, New Mexico, to
                                                                                         the extent that the necessary real property interests have been acquired by any
                                                                                         entity requesting such storage; and
                                                                                           (2) amend the March 20, 1986, contract between the United States of America




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         and the Albuquerque Bernalillo County Water Utility Authority (assigned by
                                                                                         the City of Albuquerque, New Mexico to the Albuquerque Bernalillo County
                                                                                         Water Utility Authority) for water storage space in Abiquiu Reservoir to allow




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00040   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      41
                                                                                        for storage by the Albuquerque Bernalillo County Water Utility Authority of
                                                                                        San Juan-Chama project water or native Rio Grande system water up to ele-
                                                                                        vation 6230.00 NGVD29.
                                                                                     (d) STORAGE AGREEMENTS WITH USERS OTHER THAN THE ALBUQUERQUE
                                                                                   BERNALILLO COUNTY WATER UTILITY AUTHORITY.—The Secretary shall—
                                                                                          (1) retain or enter into new agreements with entities for a proportionate allo-
                                                                                        cation of 29,100 acre-feet of storage space pursuant to section 5 of Public Law
                                                                                        97–140; and
                                                                                          (2) amend or enter into new storage agreements for storage of San Juan-
                                                                                        Chama project water or native Rio Grande system water up to the space allo-
                                                                                        cated for each entity’s proportionate share of San Juan-Chama water.
                                                                                     (e) OPERATIONS DOCUMENTS.—The Secretary shall amend or revise any existing
                                                                                   operations documents, including the Water Control Manual or operations plan for
                                                                                   Abiquiu Reservoir, as necessary to meet the requirements of this section.
                                                                                     (f) LIMITATIONS.—In carrying out this section, the following limitations shall
                                                                                   apply:
                                                                                          (1) The storage of native Rio Grande system water shall be subject to the pro-
                                                                                        visions of the Rio Grande Compact and the resolutions of the Rio Grande Com-
                                                                                        pact Commission.
                                                                                          (2) The storage of native Rio Grande system water shall only be authorized
                                                                                        to the extent that the necessary water ownership and storage rights have been
                                                                                        acquired by the entity requesting such storage.
                                                                                          (3) The storage of native Rio Grande system water or San-Juan Chama
                                                                                        project water shall not interfere with the authorized purposes of the Abiquiu
                                                                                        Dam and Reservoir project.
                                                                                          (4) Each user of storage space, regardless of source of water, shall pay for any
                                                                                        increase in costs attributable to storage of that user’s water.
                                                                                   SEC. 324. PAWCATUCK RIVER, LITTLE NARRAGANSETT BAY AND WATCH HILL COVE, RHODE
                                                                                              ISLAND AND CONNECTICUT.
                                                                                     Beginning on the date of enactment of this Act, that portion of the project for
                                                                                   navigation, Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode
                                                                                   Island and Connecticut, authorized by section 2 of the Act of March 2, 1945 (chapter
                                                                                   19, 59 Stat. 13), consisting of a 10-foot deep, 16-acre anchorage area in Watch Hill
                                                                                   Cove is no longer authorized.
                                                                                   SEC. 325. HARRIS COUNTY, TEXAS.
                                                                                     Section 575 of the Water Resources Development Act of 1996 (110 Stat. 3789) is
                                                                                   repealed.
                                                                                   SEC. 326. CAP SANTE WATERWAY, WASHINGTON.
                                                                                     Beginning on the date of enactment of this Act, the project for navigation, Cap
                                                                                   Sante Waterway and Navigation Channel, Skagit County, Washington, authorized
                                                                                   by the Act of March 2, 1919 (chapter 95, 40 Stat. 1285), is modified to deauthorize
                                                                                   the portion of the project consisting of an approximately 334,434 foot area of the
                                                                                   Federal channel within Anacortes Harbor inside and directly adjacent to the Federal
                                                                                   breakwater and training wall structure, starting at a point with coordinates
                                                                                   N557015.552, E1210819.619, thence running S88 13’2.06’’E approximately 200 feet
                                                                                   to a point with coordinates N557009.330, E1211019.522, thence running S01
                                                                                   46’58.08’’W approximately 578 feet to a point with coordinates N556431.405,
                                                                                   E1211001.534, thence running S49 49’50.23’’W approximately 69 feet to a point with
                                                                                   coordinates N556387.076, E1210949.002, thence running S51 53’0.25’’E approxi-
                                                                                   mately 35 feet to a point with coordinates N556365.662, E1210976.316, thence run-
                                                                                   ning S49 38’58.48’’W approximately 112 feet to a point with coordinates
                                                                                   N556292.989, E1210890.775, thence running N88 13’1.87’’W approximately 109 feet
                                                                                   to a point with coordinates N556296.367, E1210782.226, thence running S46
                                                                                   46’58.97’’W approximately 141 feet to a point with coordinates N556199.527,
                                                                                   E1210679.164, thence running N88 13’1.77’’W approximately 700 feet to a point
                                                                                   with coordinates N556221.305, E1209979.502, thence running N01 46’58.08’’E ap-
                                                                                   proximately 250 feet to a point with coordinates N556471.184, E1209987.280, thence
                                                                                   running S88 13’1.77’’E approximately 815 feet to a point with coordinates
                                                                                   N556445.828, E1210801.886, thence running N01 46’58.08’’E approximately 570 feet
                                                                                   to the point of origin.
                                                                                   SEC. 327. REGIONAL SEDIMENT MANAGEMENT.
                                                                                     The Secretary shall expedite the activities required to be carried out under section
                                                                                   204 of the Water Resources Development Act of 1992 (33 U.S.C. 2326) regarding the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   use of improvement dredging of the Portsmouth Federal navigation project in Ports-
                                                                                   mouth, New Hampshire, as a source of clean beach fill material to reinforce the
                                                                                   stone revetment at Nantasket Beach, Hull, Massachusetts.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00041   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      42
                                                                                   SEC. 328. ADDITIONAL ASSISTANCE FOR CRITICAL PROJECTS.
                                                                                     (a) CONSISTENCY WITH REPORTS.—Congress finds that the project modifications
                                                                                   described in this section are in accordance with the reports submitted to Congress
                                                                                   by the Secretary under section 7001 of the Water Resources Reform and Develop-
                                                                                   ment Act of 2014 (33 U.S.C. 2282d), titled ‘‘Report to Congress on Future Water Re-
                                                                                   sources Development’’, or have otherwise been reviewed by Congress.
                                                                                     (b) MODIFICATIONS.—
                                                                                          (1) SACRAMENTO AREA, CALIFORNIA.—Section 219(f)(23) of the Water Re-
                                                                                       sources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 117 Stat. 1840)
                                                                                       is amended to read as follows:
                                                                                          ‘‘(23) SACRAMENTO AREA, CALIFORNIA.—$45,000,000 for regional water con-
                                                                                       servation, recycling, reliability, and resiliency projects in Placer, El Dorado, and
                                                                                       Sacramento Counties and the San Juan Suburban Water District, California.’’.
                                                                                          (2) SOUTH PERRIS, CALIFORNIA.—Section 219(f)(52) of the Water Resources De-
                                                                                       velopment Act of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat. 2763A–220) is
                                                                                       amended by striking ‘‘$25,000,000’’ and inserting ‘‘$50,000,000’’.
                                                                                          (3) MADISON AND ST. CLAIR COUNTIES, ILLINOIS.—Section 219(f)(55) of the
                                                                                       Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 335; 114
                                                                                       Stat. 2763A–221) is amended by striking ‘‘$10,000,000’’ and inserting
                                                                                       ‘‘$45,000,000’’.
                                                                                          (4) SOUTHERN AND EASTERN KENTUCKY.—Section 531 of the Water Resources
                                                                                       Development Act of 1996 (110 Stat. 3773; 113 Stat. 348; 117 Stat. 142; 121 Stat.
                                                                                       1226) is amended—
                                                                                                (A) in subsection (g), by inserting ‘‘Boyd, Carter, Elliott, Lincoln,’’ after
                                                                                             ‘‘Lee,’’; and
                                                                                                (B) in subsection (h), by striking ‘‘$40,000,000’’ and inserting
                                                                                             ‘‘$80,000,000’’.
                                                                                          (5) DESOTO COUNTY, MISSISSIPPI.—Section 219(f)(30) of the Water Resources
                                                                                       Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat. 2763A–220;
                                                                                       119 Stat. 282; 119 Stat. 2257; 122 Stat. 1623) is amended by striking
                                                                                       ‘‘$75,000,000’’ and inserting ‘‘$130,000,000’’.
                                                                                          (6) JACKSON COUNTY, MISSISSIPPI.—Section 219(e)(1) of the Water Resources
                                                                                       Development Act of 1992 (106 Stat. 4835; 110 Stat. 3757; 113 Stat. 1494; 121
                                                                                       Stat. 1258) is amended by striking ‘‘$32,500,000’’ and inserting ‘‘$57,500,000’’.
                                                                                          (7) ST. LOUIS, MISSOURI.—Section 219(f)(32) of the Water Resources Develop-
                                                                                       ment Act of 1992 (106 Stat. 4835; 113 Stat. 337; 121 Stat. 1233) is amended
                                                                                       by striking ‘‘$35,000,000’’ and inserting ‘‘$70,000,000’’.
                                                                                          (8) MIDWEST CITY, OKLAHOMA.—Section 219(f)(231) of the Water Resources
                                                                                       Development Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat. 1266) is
                                                                                       amended by striking ‘‘$2,000,000’’ and inserting ‘‘$5,000,000’’.
                                                                                          (9) SOUTH CENTRAL PENNSYLVANIA.—Section 313 of the Water Resources De-
                                                                                       velopment Act of 1992 (106 Stat. 4845; 109 Stat. 407; 110 Stat. 3723; 113 Stat.
                                                                                       310; 117 Stat. 142; 121 Stat. 1146) is amended—
                                                                                                (A) in subsection (g)(1), by striking ‘‘$200,000,000’’ and inserting
                                                                                             ‘‘$400,000,000’’; and
                                                                                                (B) in subsection (h)(2), by inserting ‘‘Beaver, Jefferson,’’ after ‘‘Wash-
                                                                                             ington,’’.
                                                                                          (10) LAKES MARION AND MOULTRIE, SOUTH CAROLINA.—Section 219(f)(25) of
                                                                                       the Water Resources Development Act of 1992 (106 Stat. 4835; 113 Stat. 336;
                                                                                       114 Stat. 2763A–220; 117 Stat. 1838; 130 Stat. 1677; 132 Stat. 3818) is amend-
                                                                                       ed by striking ‘‘$89,550,000’’ and inserting ‘‘$110,000,000’’.
                                                                                          (11) EL PASO COUNTY, TEXAS.—Section 219(f)(269) of the Water Resources De-
                                                                                       velopment Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat. 1268) is amend-
                                                                                       ed by striking ‘‘$25,000,000’’ and inserting ‘‘$75,000,000’’.
                                                                                          (12) WESTERN RURAL WATER.—Section 595 of the Water Resources Develop-
                                                                                       ment Act of 1999 (113 Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat. 1836;
                                                                                       118 Stat. 440; 121 Stat. 1219; 123 Stat. 2851; 128 Stat. 1316; 130 Stat. 1681)
                                                                                       is amended—
                                                                                                (A) by striking the section heading and inserting ‘‘WESTERN RURAL
                                                                                             WATER.’’;
                                                                                                (B) in subsections (b) and (c), by inserting ‘‘Arizona,’’ before ‘‘Idaho’’ each
                                                                                             place it appears; and
                                                                                                (C) in subsection (i), by striking ‘‘for the period beginning with fiscal year
                                                                                             2001, $435,000,000, to remain available until expended.’’ and inserting the
                                                                                             following: ‘‘, to remain available until expended—




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          ‘‘(1) for the period beginning with fiscal year 2001, $435,000,000 for Idaho,
                                                                                       Montana, rural Nevada, New Mexico, rural Utah, and Wyoming; and
                                                                                          ‘‘(2) $150,000,000 for Arizona.’’.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00042   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      43
                                                                                           (13) CENTRAL WEST VIRGINIA.—Section 571(h) of the Water Resources Devel-
                                                                                        opment Act of 1999 (113 Stat. 371; 121 Stat. 1257) is amended by striking
                                                                                        ‘‘$20,000,000’’ and inserting ‘‘$40,000,000’’.
                                                                                           (14) SOUTHERN WEST VIRGINIA.—Section 340(g) of the Water Resources Devel-
                                                                                        opment Act of 1992 (106 Stat. 4856; 110 Stat. 3727; 113 Stat. 320) is amended
                                                                                        by striking ‘‘$40,000,000’’ and inserting ‘‘$120,000,000’’.
                                                                                     (c) LOWELL CREEK TUNNEL, SEWARD, ALASKA.—Section 5032(a)(2) of the Water
                                                                                   Resources Development Act of 2007 (Public Law 110–114, 121 Stat. 1205) is amend-
                                                                                   ed by striking ‘‘15’’ and inserting ‘‘20’’.
                                                                                   SEC. 329. PROJECT MODIFICATION AUTHORIZATIONS.
                                                                                      (a) WATER SUPPLY.—The following project modifications for water supply, as iden-
                                                                                   tified in the report entitled ‘‘Report to Congress on Future Water Resources Devel-
                                                                                   opment’’ dated February 2019, and submitted to Congress on June 3, 2019, pursu-
                                                                                   ant to section 7001 of the Water Resources Reform and Development Act of 2014
                                                                                   (33 U.S.C. 2282d) or otherwise reviewed by Congress, are authorized to be carried
                                                                                   out by the Secretary substantially in accordance with the recommendations, in-
                                                                                   cluded in such report pursuant to section 301(c) of the Water Supply Act of 1958
                                                                                   (43 U.S.C. 390b(c)):
                                                                                           (1) The project modification for the State of Missouri, Clarence Cannon Dam
                                                                                        and Mark Twain Lake Project Salt River, Missouri.
                                                                                           (2) The project modification for the City of Plattsburg, Smithville Lake, Mis-
                                                                                        souri.
                                                                                           (3) The project modification for the City of Smithville, Smithville Lake, Mis-
                                                                                        souri.
                                                                                      (b) FLOOD RISK MANAGEMENT.—The following project modifications for flood risk
                                                                                   management, as identified in a report entitled ‘‘Report to Congress on Future Water
                                                                                   Resources Development’’, and submitted to Congress pursuant to section 7001 of the
                                                                                   Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) or other-
                                                                                   wise reviewed by Congress, are authorized to be carried out by the Secretary:
                                                                                           (1) Modification of the project for flood risk management, lower Mississippi
                                                                                        River, authorized by the Act of May 15, 1928 (chapter 569, 45 Stat. 534), to in-
                                                                                        corporate the Wolf River Backwater and Nonconnah Creek levee systems into
                                                                                        the project, authorized by section 5 of the Act of June 22, 1936 (chapter 688,
                                                                                        49 Stat. 1575; 50 Stat. 881), subject to the determination of the Secretary that
                                                                                        such systems meet all requirements applicable to such project.
                                                                                           (2) Modification of the project for flood risk management, Red River below
                                                                                        Denison Dam, Arkansas, Louisiana, and Texas, authorized by the Act of June
                                                                                        28, 1938 (chapter 795, 52 Stat. 1219), to incorporate the Cherokee Park Levee
                                                                                        into the project, subject to the determination of the Secretary that such levee
                                                                                        meets all requirements applicable to such project.
                                                                                   SEC. 330. APPLICATION OF CREDIT.
                                                                                     Section 7007(d) of the Water Resources Development Act of 2007 (121 Stat. 1277;
                                                                                   128 Stat. 1226) is amended by inserting ‘‘, or may be applied to reduce the amounts
                                                                                   required to be paid by the non-Federal interest under the terms of the deferred pay-
                                                                                   ment agreements entered into between the Secretary and the non-Federal interest
                                                                                   for the projects authorized by section 7012(a)(1)’’ before the period at the end.
                                                                                   SEC. 331. PROJECT REAUTHORIZATIONS.
                                                                                       (a) IN GENERAL.—
                                                                                            (1) MUDDY RIVER, MASSACHUSETTS.—The separable elements for ecosystem
                                                                                         restoration of the project for flood damage reduction and environmental restora-
                                                                                         tion, Muddy River, Brookline and Boston, Massachusetts, authorized by section
                                                                                         522 of the Water Resources Development Act of 2000 (114 Stat. 2656), and de-
                                                                                         authorized pursuant to section 6001 of the Water Resources Reform and Devel-
                                                                                         opment Act of 2014 (128 Stat. 1345), are authorized to be carried out by the
                                                                                         Secretary, subject to subsection (b).
                                                                                            (2) EAST CHESTER CREEK, NEW YORK.—Notwithstanding section 1001 of the
                                                                                         Water Resources Development Act of 1986 (33 U.S.C. 579a), the project for navi-
                                                                                         gation, East Chester Creek, New York, authorized by section 101 of the River
                                                                                         and Harbor Act of 1950 (64 Stat. 164; 100 Stat. 4181), and deauthorized pursu-
                                                                                         ant to section 1001 of the Water Resources Development Act of 1986 (33 U.S.C.
                                                                                         579(a)), is authorized to be carried out by the Secretary, subject to subsection
                                                                                         (b).
                                                                                            (3) CHRISTIANSTED HARBOR, UNITED STATES VIRGIN ISLANDS.—Notwithstanding
                                                                                         section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221),




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         the portion of the project for navigation, Christiansted Harbor, St. Croix, United
                                                                                         States Virgin Islands, authorized by section 101 of the River and Harbor Act
                                                                                         of 1950 (64 Stat. 167), and deauthorized under section 1002 of the Water Re-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00043   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      44
                                                                                        sources Development Act of 1986 (100 Stat. 4221), is authorized to be carried
                                                                                        out by the Secretary, subject to subsection (b).
                                                                                           (4) CHARLOTTE HARBOR, UNITED STATES VIRGIN ISLANDS.—Notwithstanding
                                                                                        section 1002 of the Water Resources Development Act of 1986 (100 Stat. 4221),
                                                                                        the portion of the project for navigation, Charlotte Amalie (St. Thomas) Harbor,
                                                                                        St. Thomas, United States Virgin Islands, authorized by the Act of August 26,
                                                                                        1937 (chapter 832, 50 Stat. 850), and deauthorized under section 1002 of the
                                                                                        Water Resources Development Act of 1986 (100 Stat. 4221), is authorized to be
                                                                                        carried out by the Secretary, subject to subsection (b).
                                                                                      (b) REPORT TO CONGRESS.—The Secretary shall complete and submit to the Com-
                                                                                   mittee on Transportation and Infrastructure of the House of Representatives and
                                                                                   the Committee on Environment and Public Works of the Senate a post-authorization
                                                                                   change report (as such term is defined in section 1132(d) of the Water Resources
                                                                                   Development Act of 2016 (33 U.S.C. 2282e(d)) prior to carrying out a project identi-
                                                                                   fied in subsection (a).
                                                                                   SEC. 332. CONVEYANCES.
                                                                                       (a) GENERALLY APPLICABLE PROVISIONS.—
                                                                                             (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—The exact acreage and the legal
                                                                                          description of any real property to be conveyed under this section shall be deter-
                                                                                          mined by a survey that is satisfactory to the Secretary.
                                                                                             (2) APPLICABILITY OF PROPERTY SCREENING PROVISIONS.—Section 2696 of title
                                                                                          10, United States Code, shall not apply to any conveyance under this section.
                                                                                             (3) COSTS OF CONVEYANCE.—An entity to which a conveyance is made under
                                                                                          this section shall be responsible for all reasonable and necessary costs, includ-
                                                                                          ing real estate transaction and environmental documentation costs, associated
                                                                                          with the conveyance.
                                                                                             (4) LIABILITY.—An entity to which a conveyance is made under this section
                                                                                          shall hold the United States harmless from any liability with respect to activi-
                                                                                          ties carried out, on or after the date of the conveyance, on the real property con-
                                                                                          veyed. The United States shall remain responsible for any liability with respect
                                                                                          to activities carried out, before such date, on the real property conveyed.
                                                                                             (5) ADDITIONAL TERMS AND CONDITIONS.—The Secretary may require that any
                                                                                          conveyance under this section be subject to such additional terms and condi-
                                                                                          tions as the Secretary considers necessary and appropriate to protect the inter-
                                                                                          ests of the United States.
                                                                                       (b) EUFAULA, ALABAMA.—
                                                                                             (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the City of
                                                                                          Eufaula, Alabama, all right, title, and interest of the United States in and to
                                                                                          the real property described in the Department of the Army Lease No. DACW01–
                                                                                          2–17–0747, containing 56.76 acres, more or less, and being a part of Tracts L–
                                                                                          1268 (26.12 acres), L–1273 (13.71 acres), L–1278 (6.75 acres), and L1279 (10.36
                                                                                          acres) of the Walter F. George Lock and Dam and Lake project.
                                                                                             (2) DEED.—The Secretary shall convey the property under this subsection by
                                                                                          quitclaim deed under such terms and conditions as the Secretary determines
                                                                                          appropriate to protect the interests of the United States.
                                                                                             (3) CONSIDERATION.—The City of Eufaula, Alabama, shall pay to the Sec-
                                                                                          retary an amount that is not less than the fair market value of the property
                                                                                          conveyed under this subsection, as determined by the Secretary.
                                                                                       (c) MONTGOMERY, ALABAMA.—
                                                                                             (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the City of
                                                                                          Montgomery, Alabama, all right, title, and interest of the United States in and
                                                                                          to the real property described in paragraph (2).
                                                                                             (2) PROPERTY.—The property to be conveyed is the 62.38 acres of land and
                                                                                          water under the primary jurisdiction of the Secretary in the R.E. ‘‘Bob’’ Wood-
                                                                                          ruff Project Area that is covered by lease number DACW01–1–05–0037, includ-
                                                                                          ing the parcels and structure known as ‘‘Powder Magazine’’.
                                                                                             (3) DEED.—The Secretary shall convey the property under this subsection by
                                                                                          quitclaim deed under such terms and conditions as the Secretary determines
                                                                                          appropriate to protect the interests of the United States, to include retaining
                                                                                          the right to inundate with water any land transferred under this subsection.
                                                                                             (4) CONSIDERATION.—The City of Montgomery, Alabama, shall pay to the Sec-
                                                                                          retary an amount that is not less than the fair market value of the property
                                                                                          conveyed under this subsection, as determined by the Secretary.
                                                                                       (d) OHIO RIVER LOCK AND DAM NUMBER 52, MASSAC COUNTY, ILLINOIS.—




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                             (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the Massac-Me-
                                                                                          tropolis Port District, Illinois, all right, title, and interest of the United States
                                                                                          in and to any real property located north of the south bank of the Ohio River




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00044   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      45
                                                                                          in Massac County, Illinois, that is associated with the Ohio River Lock and
                                                                                          Dam 52.
                                                                                             (2) DEED.—The Secretary shall convey the property under this subsection by
                                                                                          quitclaim deed under such terms and conditions as the Secretary determines
                                                                                          appropriate to protect the interests of the United States.
                                                                                             (3) CONSIDERATION.—The Massac-Metropolis Port District, Illinois, shall pay
                                                                                          to the Secretary an amount that is not less than fair market value of the prop-
                                                                                          erty conveyed under this subsection, as determined by the Secretary.
                                                                                       (e) CLINTON, MISSOURI.—
                                                                                             (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the City of Clin-
                                                                                          ton, Missouri, without consideration, all right, title, and interest of the United
                                                                                          States in and to the real property described in paragraph (2).
                                                                                             (4) PROPERTY.—The property to be conveyed is a tract of land situated in the
                                                                                          S 1⁄2 of Section 12 and the N 1⁄2 of Section 13, Township 41 North, Range 26
                                                                                          West of the Fifth Principal Meridian, Henry County, Missouri, more particu-
                                                                                          larly described as follows: Beginning at the point of intersection of the north
                                                                                          line of said S 1⁄2 of Section 12 and the easterly right-of-way of State Highway
                                                                                          No. 13; thence easterly along the north line of said S 1⁄2 to the northeast corner
                                                                                          of the W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 of said Section 12; thence southerly along
                                                                                          the east line of said W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 to the southeast corner thereof;
                                                                                          thence easterly along the north line of the S 1⁄2 NE 1⁄4 SW 1⁄4 of said Section
                                                                                          12 to the southwest corner of the W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 of said Section
                                                                                          12; thence in a northeasterly direction to the northeast corner of said W 1⁄2 NW
                                                                                          1⁄4 NW 1⁄4 SE 1⁄4 ; thence easterly along the north line of said S 1⁄2 to the west-

                                                                                          erly right-of-way of the County Road; thence in a southeasterly and southerly
                                                                                          direction along the westerly right-of-way of said County Road approximately
                                                                                          2500 feet to the center of Deer Creek; thence in a southwesterly direction along
                                                                                          the center of said Deer Creek, approximately 3900 feet to the south line of said
                                                                                          N 1⁄2 of Section 13; thence westerly along the south line of said N 1⁄2 to the eas-
                                                                                          terly right-of-way line of the St. Louis-San Francisco Railroad; thence in a
                                                                                          northwesterly direction along the easterly right-of-way of said railroad to the
                                                                                          easterly right-of-way of said State Highway No. 13; thence in a northeasterly
                                                                                          direction along the easterly right-of-way of said State Highway No. 13 to the
                                                                                          point of the beginning; and including a roadway easement for ingress and
                                                                                          egress, described as a strip of land 80 feet in width, lying 40 feet on each side
                                                                                          of the following described line, the initial extremities of the following described
                                                                                          strip being extended or reduced as required to exactly adjoin the boundary lines
                                                                                          which they meet, situated in the S 1⁄2 of Section 12, Township 41 North Range
                                                                                          26 West of the Fifth Principal Meridian, Henry County, Missouri, more particu-
                                                                                          larly described as follows: Commencing at the center of said Section 12, thence
                                                                                          Sl°24’56’’W, 1265.52 feet to a point, thence N88°29’02’’W, 483.97 feet to the
                                                                                          point of beginning of the strip of land herein described; thence in a northeast-
                                                                                          erly direction along a curve to the right, said curve having an initial tangent
                                                                                          bearing of N3°44’4l’’E, a radius of 238.73 feet and an interior angle of 61°29’26’’,
                                                                                          an arc distance of 256.21 feet to a point; thence N65°14’07’’E 218.58 feet to a
                                                                                          point; thence in a northeasterly direction along a curve to the left, having a ra-
                                                                                          dius of 674.07 feet and an interior angle of 36°00’01’’, an arc distance of 423.53
                                                                                          feet to a point; thence N29°14’07’’E, 417.87 feet to a point; thence northeasterly
                                                                                          along a curve to the right, having a radius of 818.51 feet and an interior angle
                                                                                          of 14°30’01’’, an arc distance of 207.15 feet to a point; thence N43°44’07’’E, 57.00
                                                                                          feet to the southerly right-of-way line of a county road, containing 2,948 acres,
                                                                                          more or less; Excluding therefrom a tract of land situated in the S 1⁄2 of said
                                                                                          Section 12, said Township and Range, described as commencing at the center
                                                                                          of said Section 12; thence S1°24’56’’W, 1265.52 feet to the point of beginning of
                                                                                          the tract of land herein described; thence N88°29’02″W, 1122.50 feet; thence
                                                                                          S1°43’26″W, 872.62 feet; thence S88°29’02’’E, 1337.36 feet; thence Nl°43’26’’E,
                                                                                          872.62 feet; thence N88°29’02’’W, 214.86 feet to the point of beginning, con-
                                                                                          taining 26.79 acres, more or less. The above described tract contains, in the ag-
                                                                                          gregate, 177.69 acres, more or less.
                                                                                             (2) DEED.—The Secretary shall convey the property under this subsection by
                                                                                          quitclaim deed under such terms and conditions as the Secretary determines
                                                                                          appropriate to protect the interests of the United States.
                                                                                             (3) REVERSION.—If the Secretary determines that the property conveyed
                                                                                          under this subsection is not being used for a public purpose, all right, title, and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          interest in and to the property shall revert, at the discretion of the Secretary,
                                                                                          to the United States.
                                                                                       (f) CITY OF CLINTON, OLD ORCHARD ADDITION, MISSOURI.—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00045   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      46
                                                                                            (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the City of Clin-
                                                                                         ton, Missouri, all right, title, and interest of the United States in and to the
                                                                                         real property described in paragraph (2).
                                                                                            (2) PROPERTY.—The property to be conveyed is Lot 28 in Old Orchard Addi-
                                                                                         tion, a subdivision of the City of Clinton, Henry County, Missouri, containing
                                                                                         0.36 acres, more or less, including any improvements thereon.
                                                                                            (3) DEED.—The Secretary shall convey the property under this subsection by
                                                                                         quitclaim deed under such terms and conditions as the Secretary determines
                                                                                         appropriate to protect the interests of the United States, including such reserva-
                                                                                         tions, terms, and conditions as the Secretary determines necessary to allow the
                                                                                         United States to operate and maintain the Harry S. Truman Reservoir Project.
                                                                                            (4) CONSIDERATION.—The City of Clinton, Missouri, shall pay to the Secretary
                                                                                         an amount that is not less than the fair market value of the property conveyed
                                                                                         under this subsection, as determined by the Secretary.
                                                                                       (g) TRI-COUNTY LEVEE DISTRICT, MISSOURI.—
                                                                                            (1) CONVEYANCE AUTHORIZED.—The Secretary shall convey to the Tri-County
                                                                                         Levee District, Missouri, all right, title, and interest of the United States in and
                                                                                         to the real property described in paragraph (2).
                                                                                            (2) PROPERTY.—The property to be conveyed is the part of Sections 1 and 12
                                                                                         Township 45 North Range 6 West of the 5th P.M. in Montgomery County, Mis-
                                                                                         souri, described as follows: A tract of land being 60’ wide and lying South and
                                                                                         East of and adjoining the centerline of the existing levee and being described
                                                                                         as follows: Commencing at the NW corner of Section 12, thence S 87° 52’ 35’’
                                                                                         E 587.4’, thence S 01° 29’ 25’’ W 453.68’ to the point of the beginning; said point
                                                                                         being in the center of the levee, thence with the centerline of the levee N 77°
                                                                                         01’ 30’’ E 164.92’, thence N 74° 26’ 55’’ E 250.0’, thence N 72° 27’ 55’’ E 270.0’,
                                                                                         thence N 69° 06’ 10’’ E 300.0’, thence N 66° 42’ 15’’ E 500.0’, thence N 64° 14’
                                                                                         30’’ E 270.0’, thence N 61° 09’ 10’’ E 800.0’, thence N 60° 58’ 15’’ E 1724.45’,
                                                                                         thence leaving the centerline S 01° 10’ 35’’ W 69.43’, thence parallel with the
                                                                                         above described centerline S 60° 58’ 15’’ W 1689.62’, thence S 61° 09’ 10’’ W
                                                                                         801.71’, thence S 64° 14’ 30’’ W 272.91’, thence S 66° 42’ 15’’ W 502.55’, thence
                                                                                         S 69° 06’ 10’’ W 303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S 74° 26’ 55’’
                                                                                         W 252.39’, thence S 77° 01’ 30’’ W 181.75’, thence leaving the South side of the
                                                                                         levee N 01° 26’ 25’’ E 61.96’ to the point of beginning and containing 5.89 acres
                                                                                         more or less.
                                                                                            (3) DEED.—The Secretary shall convey the property under this subsection by
                                                                                         quitclaim deed under such terms and conditions as the Secretary determines
                                                                                         appropriate to protect the interests of the United States.
                                                                                            (4) CONSIDERATION.—The Tri-County Levee District, Missouri, shall pay to
                                                                                         the Secretary an amount that is not less than the fair market value of the prop-
                                                                                         erty conveyed under this subsection, as determined by the Secretary.
                                                                                       (h) JUDGE JOSEPH BARKER, JR., HOUSE, OHIO.—
                                                                                            (1) NON-FEDERAL ENTITY.—In this subsection, the term ‘‘non-Federal entity’’
                                                                                         means the Friends of Joseph Barker, Jr., House, a nonprofit organization in the
                                                                                         State of Ohio.
                                                                                            (2) CONVEYANCE AUTHORIZED.—
                                                                                                 (A) IN GENERAL.—Subject to paragraph (6), the Secretary shall convey to
                                                                                              the non-Federal entity, without consideration, all right, title, and interest
                                                                                              of the United States in and to the property described in paragraph (3)(A).
                                                                                                 (B) EASEMENT.—Upon conveyance of the property under subparagraph
                                                                                              (A), the Secretary shall provide to the non-Federal entity, without consider-
                                                                                              ation, an easement over the property described in paragraph (3)(B) for ac-
                                                                                              cess to the conveyed property for as long as the non-Federal entity is in
                                                                                              legal possession of the conveyed property.
                                                                                            (3) DESCRIPTIONS OF PROPERTY.—
                                                                                                 (A) IN GENERAL.—The property referred to in paragraph (2)(A) is the fol-
                                                                                              lowing (as in existence on the date of enactment of this Act):
                                                                                                      (i) JUDGE JOSEPH BARKER, JR., HOUSE.—The tract of land situated in
                                                                                                   the State of Ohio, Washington County, on the Ohio River, and being
                                                                                                   particularly bounded and described as follows: Beginning at a point lo-
                                                                                                   cated on the southern right-of-way line of Ohio Route 7, a new corner
                                                                                                   to the land now or formerly owned by the United States of America;
                                                                                                   thence, leaving the right-of-way of said Route 7 and severing the land
                                                                                                   of said United States of America parallel to and approximately 10 feet
                                                                                                   easterly of the toe of the existing dredge disposal berm, southeasterly
                                                                                                   approximately 326 feet to a point prior to the current Corps of Engi-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                   neers access to the dredging spoil area; thence, northeasterly approxi-
                                                                                                   mately 480 feet paralleling the top of the slope to the riverbank side
                                                                                                   of the house and approximately 25 feet northerly therefrom; thence,




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00046   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      47
                                                                                                 northwest approximately 302 feet to a point in the southern right-of-
                                                                                                 way of Ohio Route 7; thence with the right-of-way of said Route 7,
                                                                                                 southwesterly approximately 485 feet to the point of beginning, con-
                                                                                                 taining approximately 3.51 acres.
                                                                                                    (ii) ROAD TRACT.—The tract of land situated in the State of Ohio,
                                                                                                 Washington County, on the Ohio River, and being particularly bounded
                                                                                                 and described as follows: Beginning at a point located on the southern
                                                                                                 right-of-way line of Ohio Route 7, a new corner to the land now or for-
                                                                                                 merly owned by the United States of America; thence, leaving the
                                                                                                 right-of-way of said Route 7 and severing the land of said United States
                                                                                                 of America and with the House Parcel southeasterly 25 feet; thence,
                                                                                                 northeast, running parallel to said Route 7 right-of-way, approximately
                                                                                                 994 feet to a point of deflection; thence northeasterly 368 feet to a point
                                                                                                 beyond the existing fence corner; thence, east 140 feet to the edge of
                                                                                                 the existing Willow Island access road; thence with said access road,
                                                                                                 northwesterly approximately 62 feet to a point in the southern right-
                                                                                                 of-way of Ohio Route 7; thence with the right-of-way of said Route 7,
                                                                                                 southwesterly approximately 1,491 feet to the point of beginning, con-
                                                                                                 taining approximately 1 acre.
                                                                                               (B) EASEMENT.—The property referred to in paragraph (2)(B) is the fol-
                                                                                            lowing: The tract of land situated in the State of Ohio, Washington County,
                                                                                            on the Ohio River, and being particularly bounded and described as follows:
                                                                                            Beginning at a point at the intersection of the southern right-of-way of Ohio
                                                                                            Route 7 and the northeast side of the existing Willow Island access road,
                                                                                            a new corner to the land now or formerly owned by the United States of
                                                                                            America; thence, southwest, running with said Route 7 right-of-way, ap-
                                                                                            proximately 30 feet to a point on the southwest side of the existing access
                                                                                            road, and corner to the road tract; thence with said access road and the line
                                                                                            of the road parcel, southeasterly approximately 62 feet to a point; thence
                                                                                            leaving the road parcel and crossing the existing access road northeasterly
                                                                                            approximately 30 feet to a point located on the northeast side of the exist-
                                                                                            ing access road; thence, northwesterly approximately 62 feet, to the point
                                                                                            of beginning, containing approximately 0.04 acre.
                                                                                          (4) DEED.—The Secretary shall convey the property under this subsection by
                                                                                        quitclaim deed under such terms and conditions as the Secretary determines
                                                                                        appropriate to protect the interests of the United States.
                                                                                          (5) REVERSION.—If the Secretary determines that the property conveyed
                                                                                        under this subsection is not being used by the non-Federal entity for a public
                                                                                        purpose, all right, title, and interest in and to the property shall revert, at the
                                                                                        discretion of the Secretary, to the United States.
                                                                                          (6) REQUIREMENTS.—
                                                                                               (A) IMPROVEMENTS.—The Secretary shall make such improvements and
                                                                                            alterations to the property described in paragraph (3)(A)(i) as the Secretary,
                                                                                            in consultation with the non-Federal entity and relevant stakeholders, de-
                                                                                            termines to be appropriate to facilitate conveyance of the property and pro-
                                                                                            vision of the easement under this subsection, subject to the condition that
                                                                                            the total cost of those improvements and alterations undertaken by the Sec-
                                                                                            retary shall be not more than $120,000.
                                                                                               (B) ENVIRONMENTAL ASSESSMENT.—Before making a conveyance under
                                                                                            paragraph (2), the Secretary shall—
                                                                                                    (i) conduct, with respect to the property to be conveyed, an assess-
                                                                                                 ment of the environmental condition of the property, including an in-
                                                                                                 vestigation of any potential hazardous, toxic, or radioactive waste
                                                                                                 present on such property; and
                                                                                                    (ii) submit to the non-Federal entity a report describing the results
                                                                                                 of such assessment.
                                                                                               (C) REFUSAL BY NON-FEDERAL ENTITY.—
                                                                                                    (i) IN GENERAL.—Upon review by the non-Federal entity of the report
                                                                                                 under subparagraph (B), the non-Federal entity may elect to refuse the
                                                                                                 conveyance under this subsection.
                                                                                                    (ii) ELECTION.—An election under clause (i)—
                                                                                                          (I) shall be at the sole discretion of the non-Federal entity; and
                                                                                                          (II) shall be made by the non-Federal entity by not later than the
                                                                                                       date that is 30 days after the date of submission of the report
                                                                                                       under subparagraph (B)(ii).




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                               (D) DREDGED MATERIAL PLACEMENT ACTIVITIES.—The Secretary shall—
                                                                                                    (i) notify and coordinate with the non-Federal entity and relevant
                                                                                                 stakeholders before carrying out any dredged material placement ac-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00047   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      48
                                                                                                    tivities associated with the property described in paragraph (3)(A) after
                                                                                                    the date on which such property is conveyed under this subsection; and
                                                                                                       (ii) in carrying out a dredged material placement activity under
                                                                                                    clause (i), act in accordance with Engineer Manual EM 1110–2–5025
                                                                                                    (or a subsequent version of that manual).
                                                                                            (7) RESERVATION OF RIGHTS.—The Secretary may reserve and retain from any
                                                                                          conveyance under this subsection a right-of-way or any other right that the Sec-
                                                                                          retary determines to be necessary for the operation and maintenance of the au-
                                                                                          thorized Federal channel along the Ohio River.
                                                                                            (8) TREATMENT.—Conveyance to the non-Federal entity under this subsection
                                                                                          of property described in paragraph (3)(A)(i) shall satisfy all obligations of the
                                                                                          Secretary with respect to such property under—
                                                                                                  (A) section 306101 of title 54, United States Code; and
                                                                                                  (B) section 306108 of title 54, United States Code, with respect to the ef-
                                                                                               fects on the property of dredged material placement activities carried out
                                                                                               by the Secretary after the date of the conveyances.
                                                                                            (9) INAPPLICABILITY.—Subtitle I of title 40, and chapter 4 of title 41, United
                                                                                          States Code shall not apply to any conveyance or easement provided under this
                                                                                          subsection.
                                                                                       (i) LEABURG FISH HATCHERY, LANE COUNTY, OREGON.—
                                                                                            (1) CONVEYANCE AUTHORIZED.—Subject to the provisions of this subsection,
                                                                                          the Secretary shall convey, without consideration, to the State of Oregon, acting
                                                                                          through the Oregon Department of Fish and Wildlife, all right, title, and inter-
                                                                                          est of the United States in and to the real property comprising the Leaburg
                                                                                          Fish Hatchery, consisting of approximately 21.55 acres, identified as tracts Q–
                                                                                          1500, Q–1501E, and 300E–1 and described in Department of the Army Lease
                                                                                          No. DACW57–1–18–0009, together with any improvements on the property.
                                                                                            (2) WATER RIGHTS.—The Secretary may transfer to the State of Oregon, acting
                                                                                          through the Oregon Department of Fish and Wildlife, any water rights held by
                                                                                          the United States that are appurtenant to the property conveyed under this
                                                                                          subsection.
                                                                                            (3) DEED.—The Secretary shall convey the property under this subsection by
                                                                                          quitclaim deed under such terms and conditions as the Secretary determines
                                                                                          appropriate to protect the interests of the United States, including a condition
                                                                                          that all of the property conveyed under this subsection be used and maintained
                                                                                          by the State of Oregon for the purpose of operating a fish hatchery in per-
                                                                                          petuity.
                                                                                            (4) REVERSION.—If the Secretary determines that the property conveyed
                                                                                          under this subsection is not being used or maintained by the State of Oregon
                                                                                          for the purpose of operating a fish hatchery in perpetuity, all or any portion of
                                                                                          the property, including any water rights transferred under this subsection,
                                                                                          shall, at the option of the Secretary, revert to the United States.
                                                                                            (5) SAVINGS CLAUSE.—If the State of Oregon does not accept the conveyance
                                                                                          under this subsection, the Secretary may dispose of the property, including ap-
                                                                                          purtenant water rights, under subchapter III of chapter 5 of title 40, United
                                                                                          States Code.
                                                                                       (j) WILLAMETTE FALLS LOCKS, WILLAMETTE RIVER, OREGON.—
                                                                                            (1) DEFINITIONS.—In this section:
                                                                                                  (A) REAL ESTATE APPENDIX.—The term ‘‘real estate appendix’’ means Ap-
                                                                                               pendix A of the document published by the District Commander of the Port-
                                                                                               land District of the Corps of Engineers, titled ‘‘Willamette Falls Locks Wil-
                                                                                               lamette River Oregon Section 216 Disposition Study with Integrated Envi-
                                                                                               ronmental Assessment’’.
                                                                                                  (B) RECEIVING ENTITY.—The term ‘‘receiving entity’’ means an entity
                                                                                               identified by the State of Oregon, in consultation with the Willamette Falls
                                                                                               Locks Commission, to receive the conveyance under paragraph (2).
                                                                                                  (C) WILLAMETTE FALLS LOCKS PROJECT.—The term ‘‘Willamette Falls
                                                                                               Locks project’’ means the project for navigation, Willamette Falls Locks,
                                                                                               Willamette River, Oregon, authorized by the Act of June 25, 1910 (36 Stat.
                                                                                               664, chapter 382).
                                                                                                  (D) WILLAMETTE FALLS LOCKS REPORT.—The term ‘‘Willamette Falls
                                                                                               Locks report’’ means the memorandum of the Director of Civil Works with
                                                                                               the subject ‘‘Willamette Falls Locks (WFL), Willamette River Oregon Sec-
                                                                                               tion 216 Disposition Study with Integrated Environmental Assessment
                                                                                               (Study)’’, dated July 11, 2019.
                                                                                            (2) CONVEYANCE AUTHORIZED.—The Secretary is authorized to convey to the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          receiving entity, without consideration, all right, title, and interest of the
                                                                                          United States in and to any land in which the Federal Government has a prop-
                                                                                          erty interest for the Willamette Falls Locks project, together with any improve-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00048   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      49
                                                                                        ments on the land, subject to the requirements of this subsection and in accord-
                                                                                        ance with the Willamette Falls Locks report.
                                                                                           (3) DEED.—The Secretary shall convey the property under this subsection by
                                                                                        quitclaim deed under such terms and conditions as the Secretary determines
                                                                                        appropriate to protect the interests of the United States.
                                                                                           (4) SUBJECT TO EXISTING EASEMENTS AND OTHER INTERESTS.—The conveyance
                                                                                        of property under paragraph (2) shall be subject to all existing deed reserva-
                                                                                        tions, easements, rights-of-way, and leases that are in effect as of the date of
                                                                                        the conveyance.
                                                                                           (5) REVERSION.—If the Secretary determines that the property conveyed
                                                                                        under this subsection cease to be held in public ownership, all right, title, and
                                                                                        interest in and to the property shall revert, at the discretion of the Secretary,
                                                                                        to the United States.
                                                                                           (6) REQUIREMENTS BEFORE CONVEYANCE.—
                                                                                                (A) PERPETUAL ROAD EASEMENT.—Before making the conveyance under
                                                                                             paragraph (2), the Secretary shall acquire a perpetual road easement from
                                                                                             an adjacent property owner for use of an access road, which easement shall
                                                                                             convey with the property conveyed under such paragraph.
                                                                                                (B) ENVIRONMENTAL COMPLIANCE.—Before making the conveyance under
                                                                                             paragraph (2), in accordance with the real estate appendix, the Secretary
                                                                                             shall complete a Phase 1 Environmental Site Assessment pursuant to the
                                                                                             Comprehensive Environmental Response, Compensation, and Liability Act
                                                                                             of 1980 (42 U.S.C. 9601 et seq.).
                                                                                                (C) HISTORIC PRESERVATION.—The Secretary may enter into a memo-
                                                                                             randum of agreement with the Oregon State Historic Preservation Office
                                                                                             and the Advisory Council on Historic Preservation that identifies actions
                                                                                             the Secretary shall take before making the conveyance under paragraph (2).
                                                                                                (D) REPAIRS.—Before making the conveyance under paragraph (2), the
                                                                                             Secretary shall carry out repairs to address primary seismic and safety
                                                                                             risks in accordance with the recommendations approved in the Willamette
                                                                                             Falls Locks report.
                                                                                           (7) DEAUTHORIZATION.—Beginning on the date on which the Secretary makes
                                                                                        the conveyance under paragraph (2), the Willamette Falls Locks project is no
                                                                                        longer authorized.
                                                                                   SEC. 333. REPEALS.
                                                                                      (a) Section 1001 of the Water Resources Development Act of 1986 (33 U.S.C. 579a)
                                                                                   is amended—
                                                                                           (1) in subsection (b), by striking paragraph (2) and redesignating paragraph
                                                                                         (3) as paragraph (2); and
                                                                                           (2) by striking subsection (c).
                                                                                      (b) Section 6003 of the Water Resources Reform and Development Act of 2014 (33
                                                                                   U.S.C. 579c) (and the item relating to such section in the table of contents) are re-
                                                                                   pealed.
                                                                                      (c) Section 1301 of the Water Resources Development Act of 2016 (33 U.S.C. 579d)
                                                                                   (and the item relating to such section in the table of contents) are repealed.
                                                                                      (d) Section 1302 of the Water Resources Development Act of 2016 (33 U.S.C.
                                                                                   579c–1) (and the item relating to such section in the table of contents) are repealed.
                                                                                      (e) Section 1301 of the Water Resources Development Act of 2018 (33 U.S.C.
                                                                                   579d–1) (and the item relating to such section in the table of contents) are repealed.
                                                                                      (f) Section 1302 of the Water Resources Development Act of 2018 (33 U.S.C. 579c–
                                                                                   2) (and the item relating to such section in the table of contents) are repealed.

                                                                                                     TITLE IV—WATER RESOURCES
                                                                                                          INFRASTRUCTURE
                                                                                   SEC. 401. PROJECT AUTHORIZATIONS.
                                                                                     The following projects for water resources development and conservation and
                                                                                   other purposes, as identified in the reports titled ‘‘Report to Congress on Future
                                                                                   Water Resources Development’’ submitted to Congress pursuant to section 7001 of
                                                                                   the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d) or oth-
                                                                                   erwise reviewed by Congress, are authorized to be carried out by the Secretary sub-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   stantially in accordance with the plans, and subject to the conditions, described in
                                                                                   the respective reports or decision documents designated in this section:
                                                                                         (1) NAVIGATION.—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00049   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                        50
                                                                                                                                     C.
                                                                                                                                  Date of                             D.
                                                                                                            B.
                                                                                       A. State                                  Report of                        Estimated
                                                                                                           Name                Chief of Engi-                       Costs
                                                                                                                                   neers

                                                                                       1. AK      Port of Nome Modifica-     May 29, 2020           Federal: $368,173,000
                                                                                                    tions                                           Non-Federal: $122,746,000
                                                                                                                                                    Total: $490,919,000

                                                                                       2. AK      Unalaska (Dutch Har-       February 7,            Federal: $26,202,750
                                                                                                   bor) Channels               2020                 Non-Federal: $8,734,250
                                                                                                                                                    Total: $34,937,000

                                                                                       3. CT      New Haven Harbor           May 7, 2020            Federal: $53,489,000
                                                                                                   Navigation Improve-                              Non-Federal: $18,822,000
                                                                                                   ment Project                                     Total: $72,311,000

                                                                                       4. NY,     New York and New           April 23, 2020         Federal: $18,940,000
                                                                                         NJ        Jersey Harbor An-                                Non-Federal: $6,310,000
                                                                                                   chorages                                         Total: $25,250,000

                                                                                       5. TX      Gulf Intracoastal Wa-      October 23,            Total: $409,777,000, to be derived 1⁄2
                                                                                                   terway, Brazos River       2019                    from the general fund of the Treas-
                                                                                                   Floodgates and Colo-                               ury and 1⁄2 from the Inland Water-
                                                                                                   rado River Locks                                   ways Trust Fund.

                                                                                       6. TX      Houston Ship Channel       April 23, 2020         Federal: $462,803,000
                                                                                                   Expansion Channel                                Non-Federal: $414,045,000
                                                                                                   Improvement Project,                             Total: $876,848,000
                                                                                                   Harris, Chambers,
                                                                                                   and Galveston Coun-
                                                                                                   ties

                                                                                       7. TX      Matagorda Ship Chan-       November 15,           Federal: $138,660,000
                                                                                                   nel Improvement            2019                  Non-Federal: $79,664,000
                                                                                                   Project, Port Lavaca                             Total: $218,324,000

                                                                                               (2) FLOOD RISK MANAGEMENT.—

                                                                                                                                     C.
                                                                                                                                  Date of                             D.
                                                                                                            B.
                                                                                       A. State                                  Report of                        Estimated
                                                                                                           Name                Chief of Engi-                       Costs
                                                                                                                                   neers

                                                                                       1. AZ      Little Colorado River at   December 14,           Federal: $52,462,000
                                                                                                    Winslow, Navajo           2018                  Non-Federal: $28,249,000
                                                                                                    County                                          Total: $80,711,000

                                                                                       2. CA      Westminster, East Gar-     July 9, 2020           Federal: $314,506,000
                                                                                                   den Grove, California                            Non-Federal: $910,092,000
                                                                                                   Flood Risk Manage-                               Total: $1,224,598,000
                                                                                                   ment

                                                                                       3. CT,     Westchester County         May 7, 2020            Federal: $14,702,500
                                                                                         NY        Streams, Byram                                   Non-Federal: $14,702,500
                                                                                                   River Basin, Fairfield                           Total: $29,405,000
                                                                                                   County, Connecticut,
                                                                                                   and Westchester
                                                                                                   County, New York

                                                                                       4. ND      Souris River Basin         April 16, 2019         Federal: $58,041,750
                                                                                                    Flood Risk Manage-                              Non-Federal: $31,253,250
                                                                                                    ment                                            Total: $89,295,000

                                                                                       5. NJ      Peckman River Basin        April 29, 2020         Federal: $95,022,000




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                                                                    Non-Federal: $51,166,000
                                                                                                                                                    Total: $146,188,000




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006   PO 00000   Frm 00050    Fmt 6659   Sfmt 6621    E:\HR\OC\HR460P1.XXX      HR460P1
                                                                                                                                       51
                                                                                                                                    C.
                                                                                                                                 Date of                             D.
                                                                                                            B.
                                                                                       A. State                                 Report of                        Estimated
                                                                                                           Name               Chief of Engi-                       Costs
                                                                                                                                  neers

                                                                                       6. NM      Middle Rio Grande         March 13, 2020         Federal: $190,538,000
                                                                                                   Flood Protection,                               Non-Federal: $102,598,000
                                                                                                   Bernalillo to Belen                             Total: $293,136,000

                                                                                       7. OK      Tulsa and West-Tulsa      April 23, 2020         Federal: $86,780,000
                                                                                                    Levee System, Tulsa                            Non-Federal: $46,728,000
                                                                                                    County                                         Total: $133,508,000


                                                                                               (3) HURRICANE AND STORM DAMAGE RISK REDUCTION.—

                                                                                                                                   C.
                                                                                                                                 Date of                             D.
                                                                                                            B.
                                                                                       A. State                                 Report of                        Estimated
                                                                                                           Name                  Chief of                          Costs
                                                                                                                                Engineers

                                                                                       1. DE      Delaware Beneficial       March 6, 2020          Initial Federal: $53,220,000
                                                                                                   Use of Dredged Ma-                              Initial Non-Federal: $28,660,000
                                                                                                   terial for the Dela-                            Total: $81,880,000
                                                                                                   ware River                                      Renourishment Federal: $116,380,000
                                                                                                                                                   Renourishment             Non-Federal:
                                                                                                                                                     $116,380,000
                                                                                                                                                   Renourishment Total: $232,760,000

                                                                                       2. NJ      New Jersey Beneficial     April 8, 2020          Initial Federal: $80,780,000
                                                                                                   Use of Dredged Ma-                              Initial Non-Federal: $43,500,000
                                                                                                   terial for the Dela-                            Total: $124,280,000
                                                                                                   ware River                                      Renourishment Federal: $82,140,000
                                                                                                                                                   Renourishment             Non-Federal:
                                                                                                                                                     $82,140,000
                                                                                                                                                   Renourishment Total: $164,280,000

                                                                                       3. NJ      Rahway River Basin,       June 9, 2020           Federal: $46,754,000
                                                                                                    New Jersey Coastal                             Non-Federal: $25,175,000
                                                                                                    Storm Risk Manage-                             Total: $71,929,000
                                                                                                    ment

                                                                                       4. NY      East Rockaway Inlet to    August 22, 2019        Initial Federal: $604,203,000
                                                                                                    Rockaway Inlet and                             Initial Non-Federal: $0
                                                                                                    Jamaica Bay, Atlan-                            Total: $604,203,000
                                                                                                    tic Coast of New                               Renourishment Federal: $189,763,000
                                                                                                    York                                           Renourishment             Non-Federal:
                                                                                                                                                     $189,763,000
                                                                                                                                                   Renourishment Total: $379,526,000

                                                                                       5. NY      Hashamomuck Cove          December 9,            Initial Federal: $11,549,000
                                                                                                   Coastal Storm Risk        2019                  Initial Non-Federal: $6,218,000
                                                                                                   Management                                      Total: $17,767,000
                                                                                                                                                   Renourishment Federal: $23,481,500
                                                                                                                                                   Renourishment             Non-Federal:
                                                                                                                                                     $23,481,500
                                                                                                                                                   Renourishment Total: $46,963,000

                                                                                       6. RI      Pawcatuck River Coast-    December 19,           Federal: $37,848,000
                                                                                                    al Storm Risk Man-       2018                  Non-Federal: $20,379,000
                                                                                                    agement Project                                Total: $58,227,000

                                                                                       7. VA      Norfolk Coastal Storm     February 5,            Federal: $909,040,000
                                                                                                   Risk Management            2019                 Non-Federal: $489,480,000
                                                                                                                                                   Total: $1,398,520,000




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                               (4) FLOOD RISK MANAGEMENT AND ECOSYSTEM RESTORATION.—




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006   PO 00000   Frm 00051   Fmt 6659   Sfmt 6621    E:\HR\OC\HR460P1.XXX      HR460P1
                                                                                                                                        52
                                                                                                                                     C.
                                                                                                                                  Date of                             D.
                                                                                                            B.
                                                                                       A. State                                  Report of                        Estimated
                                                                                                           Name                Chief of Engi-                       Costs
                                                                                                                                   neers

                                                                                       1. CO      South Platte River and     July 29, 2019          Federal: $334,412,000
                                                                                                    Tributaries, Adams                              Non-Federal: $200,406,000
                                                                                                    and Denver Counties                             Total: $534,818,000

                                                                                       2. NY      Fire Island Inlet to       July 9, 2020           Initial Federal: $1,541,981,000
                                                                                                    Montauk Point, New                              Initial Non-Federal: $0
                                                                                                    York Reformulation                              Total: $1,541,981,000
                                                                                                                                                    Renourishment Federal: $742,926,500
                                                                                                                                                    Renourishment             Non-Federal:
                                                                                                                                                      $742,926,500
                                                                                                                                                    Renourishment Total: $1,485,853,000


                                                                                               (5) ECOSYSTEM RESTORATION.—

                                                                                                                                     C.
                                                                                                                                  Date of                             D.
                                                                                                            B.
                                                                                       A. State                                  Report of                        Estimated
                                                                                                           Name                Chief of Engi-                       Costs
                                                                                                                                   neers

                                                                                       1. CA      Delta Islands and Lev-     December 18,           Federal: $16,746,395
                                                                                                   ees                        2018                  Non-Federal: $9,016,736
                                                                                                                                                    Total: $25,763,131

                                                                                       2. CA      Yuba River Ecosystem       June 20, 2019          Federal: $65,014,326
                                                                                                   Restoration                                      Non-Federal: $35,008,268
                                                                                                                                                    Total: $100,022,594

                                                                                       3. FL      Comprehensive Ever-        April 8, 2020          Federal: $372,232,000
                                                                                                    glades Restoration                              Non-Federal: $368,528,000
                                                                                                    Plan, Loxahatchee                               Total: $740,760,000
                                                                                                    River Watershed Res-
                                                                                                    toration Project, Mar-
                                                                                                    tin and Palm Beach
                                                                                                    Counties

                                                                                       4. IL      The Great Lakes and        May 23, 2019           Federal: $690,643,200
                                                                                                    Mississippi River                               Non-Federal: $172,660,800
                                                                                                    Interbasin Study -                              Total: $863,304,000
                                                                                                    Brandon Road, Will
                                                                                                    County

                                                                                       5. IL      South Fork of the          July 9, 2020           Federal: $11,657,000
                                                                                                    South Branch of the                             Non-Federal: $6,277,000
                                                                                                    Chicago River, Bub-                             Total: $17,934,000
                                                                                                    bly Creek, Ecosystem
                                                                                                    Restoration

                                                                                       6. MD      Anacostia Watershed        December 19,           Federal: $23,171,000
                                                                                                   Restoration, Prince        2018                  Non-Federal: $12,476,000
                                                                                                   George’s County                                  Total: $35,647,000

                                                                                       7. MO      St. Louis Riverfront-      November 1,            Federal: $60,124,000
                                                                                                    Meramec River Basin       2019                  Non-Federal: $32,375,000
                                                                                                    Ecosystem Restora-                              Total: $92,499,000
                                                                                                    tion




rfrederick on DSKBCBPHB2PROD with HEARING



                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006   PO 00000   Frm 00052    Fmt 6659   Sfmt 6621    E:\HR\OC\HR460P1.XXX      HR460P1
                                                                                                                                       53
                                                                                                                                    C.
                                                                                                                                 Date of                            D.
                                                                                                            B.
                                                                                       A. State                                 Report of                       Estimated
                                                                                                           Name               Chief of Engi-                      Costs
                                                                                                                                  neers

                                                                                       8. NM      Rio Grande, Environ-      August 5, 2019         Federal: $16,163,000
                                                                                                    mental Management                              Non-Federal: $8,703,000
                                                                                                    Program, Sandia                                Total: $24,866,000
                                                                                                    Pueblo to Isleta
                                                                                                    Pueblo, New Mexico
                                                                                                    Ecosystem Restora-
                                                                                                    tion

                                                                                       9. NY,     Hudson-Raritan Estu-      May 26, 2020           Federal: $265,320,000
                                                                                         NJ        ary Ecosystem Res-                              Non-Federal: $142,864,000
                                                                                                   toration                                        Total: $408,184,000

                                                                                       10. TX     Jefferson County Eco-     September 12,          Federal: $37,615,000
                                                                                                    system Restoration        2019                 Non-Federal: $20,254,000
                                                                                                                                                   Total: $57,869,000

                                                                                               (6) WATER SUPPLY.—

                                                                                                                                    C.
                                                                                                                                 Date of                            D.
                                                                                                            B.
                                                                                       A. State                                 Report of                       Estimated
                                                                                                           Name               Chief of Engi-                      Costs
                                                                                                                                  neers

                                                                                       1. OR      Willamette River Basin    December 18,           Federal: $0
                                                                                                   Review Reallocation,      2019                  Non-Federal: $0
                                                                                                                                                   Total: $0

                                                                                               (7) MODIFICATIONS AND OTHER PROJECTS.—

                                                                                                                                    C.                              D.
                                                                                                            B.                   Date of
                                                                                       A. State                                                                 Estimated
                                                                                                           Name                  Decision                         Costs
                                                                                                                                Document

                                                                                       1. KY      Kentucky Lock             June 9, 2020           Total: $1,152,769,000 (to be derived
                                                                                                                                                     1⁄2 from the general fund of the

                                                                                                                                                     Treasury and 1⁄2 from the Inland
                                                                                                                                                     Waterways Trust Fund)

                                                                                       2. NC      Carolina Beach Inte-      June 16, 2020          Federal: $24,205,000
                                                                                                   grated Beach Re-                                Non-Federal: $24,205,000
                                                                                                   nourishment                                     Total: $48,410,000

                                                                                       3. NC      Wrightsville Beach        July 2, 2020           Federal: $53,788,000
                                                                                                                                                   Non-Federal: $22,329,000
                                                                                                                                                   Total: $76,117,000
                                                                                                                                                   Renourishment Federal: $14,553,000
                                                                                                                                                   Renourishment           Non-Federal:
                                                                                                                                                     $14,553,000
                                                                                                                                                   Renourishment Total: $29,106,000

                                                                                       4. TX      Corpus Christi Ship       May 4, 2020            Federal: $403,000,000
                                                                                                    Channel, Deepening                             Non-Federal: $273,010,000
                                                                                                    and Widening and                               Total: $676,010,000
                                                                                                    Barge Shelves

                                                                                   SEC. 402. SPECIAL RULES.
                                                                                     (a) GREAT LAKES AND MISSISSIPPI RIVER INTERBASIN PROJECT, BRANDON ROAD,
                                                                                   WILL COUNTY, ILLINOIS.—The Secretary shall carry out the project for ecosystem
                                                                                   restoration, Great Lakes and Mississippi River Interbasin project, Brandon Road,




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Will County, Illinois, authorized by section 401 of this Act, substantially in accord-
                                                                                   ance with the terms and conditions described in the Report of the Chief of Engi-
                                                                                   neers, dated May 23, 2019, with the following modifications:




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006   PO 00000   Frm 00053   Fmt 6659   Sfmt 6621    E:\HR\OC\HR460P1.XXX      HR460P1
                                                                                                                                      54
                                                                                           (1) The Federal share of the cost of construction shall be 80 percent.
                                                                                           (2) The Secretary may include the addition or substitution of technologies or
                                                                                         measures not described in the report, as the Secretary determines to be advis-
                                                                                         able.
                                                                                      (b) WILLAMETTE RIVER BASIN REVIEW REALLOCATION STUDY.—The Secretary shall
                                                                                   carry out the project for water supply, Willamette River Basin Review Reallocation,
                                                                                   Oregon, authorized by section 401 of this Act, substantially in accordance with the
                                                                                   terms and conditions described in the Report of the Chief of Engineers, dated De-
                                                                                   cember 18, 2019, with the following modifications:
                                                                                           (1) The Secretary shall meet the obligations of the Corps of Engineers under
                                                                                         the Endangered Species Act of 1973 by complying with the June 2019 NMFS
                                                                                         Willamette Basin Review Study Biological Opinion Reasonable and Prudent Al-
                                                                                         ternative until such time, if any, as it is modified or replaced, in whole or in
                                                                                         part, through the consultation process under section 7(a) of the Endangered
                                                                                         Species Act of 1973.
                                                                                           (2) The Secretary may reallocate not more than 10 percent of overall storage
                                                                                         in the joint conservation pool, as authorized by this Act and without further
                                                                                         congressional action, if such reallocation is consistent with the ongoing con-
                                                                                         sultation under section 7(a) of the Endangered Species Act of 1973 related to
                                                                                         Willamette Valley System operations.
                                                                                           (3) The Secretary shall ensure that the revised reallocation is not reallocated
                                                                                         from a single storage use, does not seriously affect authorized project purposes,
                                                                                         and does not otherwise involve major operational changes to the project.
                                                                                      (c) CANO MARTIN PENA, SAN JUAN, PUERTO RICO.—Section 5127 of the Water Re-
                                                                                   sources Development Act of 2007 (121 Stat. 1242) is amended by striking
                                                                                   ‘‘$150,000,000’’ and inserting ‘‘$232,430,000’’.
                                                                                   SEC. 403. AUTHORIZATION OF PROJECTS BASED ON FEASIBILITY STUDIES PREPARED BY
                                                                                             NON-FEDERAL INTERESTS.
                                                                                     (a) IN GENERAL.—The Secretary is authorized to carry out the following projects
                                                                                   for water resources development and conservation and other purposes, subject to
                                                                                   subsection (b):
                                                                                          (1) FORT PIERCE, ST. LUCIE COUNTY, FLORIDA.—The project for hurricane and
                                                                                       storm damage reduction, Fort Pierce, St. Lucie County, Florida, as described in
                                                                                       the review assessment of the Secretary, titled ‘‘Review Assessment of St. Lucie
                                                                                       County, Florida Fort Pierce Shore Protection Project Section 203 Integrated
                                                                                       Feasibility Study and Environmental Assessment (June 2018)’’ and dated July
                                                                                       2018, at a total cost of $33,107,639, and at an estimated total cost of
                                                                                       $97,958,972 for periodic nourishment over the 50-year life of the project.
                                                                                          (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—The project for navigation,
                                                                                       Baptiste Collette Bayou, Louisiana, as described in the review assessment of
                                                                                       the Secretary, titled ‘‘Review Assessment of Plaquemines Parish Government’s
                                                                                       Section 203 Study Baptiste Collette Bayou Navigation Channel Deepening
                                                                                       Project Integrated Feasibility Study and Environmental Assessment (January
                                                                                       2017, Amended April 2018)’’ and dated June 2018, at a total cost of $44,920,000.
                                                                                          (3) HOUMA NAVIGATION CANAL, LOUISIANA.—The project for navigation,
                                                                                       Houma Navigation Canal, Louisiana, as described in the review assessment of
                                                                                       the Secretary, titled ‘‘Review Assessment of Houma Navigation Canal Deep-
                                                                                       ening Project Section 203 Integrated Feasibility Report and DRAFT Environ-
                                                                                       mental Impact Statement (June 2018)’’ and dated July 2018, at a total cost of
                                                                                       $253,458,000.
                                                                                          (4) CHACON CREEK, TEXAS.—The project for flood risk management, ecosystem
                                                                                       restoration, and other purposes, Chacon Creek, Texas, as described in the re-
                                                                                       view assessment of the Secretary, titled ‘‘Review Assessment of Chacon Creek,
                                                                                       Texas Section 203 Integrated Feasibility Report and DRAFT Environmental As-
                                                                                       sessment (August 2018)’’ and dated September 2018, at a total cost of
                                                                                       $51,973,000.
                                                                                     (b) REQUIREMENTS.—The Secretary may only carry out a project authorized under
                                                                                   subsection (a)—
                                                                                          (1) substantially in accordance with the applicable review assessment for the
                                                                                       project submitted by the Secretary under section 203(c) of the Water Resources
                                                                                       Development Act of 1986, as identified in subsection (a) of this section, and sub-
                                                                                       ject to such modifications or conditions as the Secretary considers appropriate
                                                                                       and identifies in a final assessment that addresses the concerns, recommenda-
                                                                                       tions, and conditions identified by the Secretary in the applicable review assess-
                                                                                       ment; and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          (2) after the Secretary transmits to the Committee on Transportation and In-
                                                                                       frastructure of the House of Representatives and the Committee on Environ-
                                                                                       ment and Public Works of the Senate such final assessment.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00054   Fmt 6659   Sfmt 6621   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      55
                                                                                     (c) TECHNICAL CORRECTION.—Section 203(c)(1) of the Water Resources Develop-
                                                                                   ment Act of 1986 (33 U.S.C. 2231(c)(1)) is amended, in the matter preceding sub-
                                                                                   paragraph (A), by striking ‘‘a report’’ and inserting ‘‘an assessment’’.

                                                                                                                   PURPOSE OF LEGISLATION
                                                                                      The purpose of H.R. 7575, the Water Resources Development Act
                                                                                   of 2020, as amended, is to authorize the United States Army Corps
                                                                                   of Engineers (Corps) to carry out water resources development ac-
                                                                                   tivities for the Nation, usually through cost-shared partnerships
                                                                                   with non-Federal sponsors. Activities include projects or studies to
                                                                                   address river and coastal navigation, the reduction of flood and
                                                                                   hurricane storm damage risks, shoreline protection, water supply
                                                                                   and conservation, the restoration and protection of ecosystems and
                                                                                   the environment, and disaster response and recovery.
                                                                                      H.R. 7575, as amended, enhances the Corps’ responsibility to ad-
                                                                                   dress the long-term resiliency of Corps projects, enables the Corps
                                                                                   to address the deferred maintenance of our Nation’s ports and har-
                                                                                   bors, expands the Corps’ ability to identify and implement nature-
                                                                                   based and natural infrastructure components, addresses the afford-
                                                                                   ability of Corps projects for economically disadvantaged and rural
                                                                                   communities, and modernizes aspects of the Corps’ decision-making
                                                                                   structure.
                                                                                                       BACKGROUND AND NEED FOR LEGISLATION
                                                                                      America enjoys an unparalleled network of natural harbors and
                                                                                   rivers. The ports, channels, locks, dams, and other infrastructure
                                                                                   that support our maritime and waterways transportation system
                                                                                   and provide flood protection for our homes and businesses are vi-
                                                                                   tally important to a healthy national economy, job growth, and
                                                                                   global competitiveness. Ensuring a sound infrastructure network is
                                                                                   a shared responsibility, with Federal and state roles recognized by
                                                                                   our Founding Fathers.
                                                                                      The Water Resources Development Act (WRDA) of 2020 promotes
                                                                                   the Federal commitment to our Nation’s competitiveness, pros-
                                                                                   perity, and economic growth by maintaining strong maritime trans-
                                                                                   portation infrastructure, ensuring the efficient flow of domestic and
                                                                                   international commerce, and protecting the lives and livelihoods of
                                                                                   the American people in a sustainable manner.
                                                                                      Through WRDA, Congress authorizes the key missions of the
                                                                                   Corps, including developing, maintaining, and supporting the Na-
                                                                                   tion’s economically vital waterway infrastructure and supporting
                                                                                   effective and targeted flood protection and environmental restora-
                                                                                   tion needs. WRDA also provides Congress the opportunity to imple-
                                                                                   ment critical policy reforms and strengthen oversight.
                                                                                      Since 2014, the Committee has returned to regular consideration
                                                                                   of Water Resources Development Acts once each Congress. WRDA
                                                                                   2020 continues the WRDA two-year cycle that provides appropriate
                                                                                   oversight of, and policy direction to, the Administration and the
                                                                                   Corps, including bipartisan changes to how the Corps carries out
                                                                                   vital coastal and inland navigation projects and addresses both the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   resiliency and affordability of future water resources development
                                                                                   projects.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00055   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      56

                                                                                   The Role of Harbors, Harbor Maintenance Needs, and the Inland
                                                                                        Waterways System
                                                                                      According to the Congressional Research Service (CRS), ocean-
                                                                                   going vessels carry more merchandise trade (measured in tons) to
                                                                                   and from the United States than all other modes combined (air,
                                                                                   trucks, rail, and pipeline).1 This accounts for 80 percent of the total
                                                                                   merchandise trade volume for the country. The dependence of trade
                                                                                   on ports and shipping channels makes the operation and mainte-
                                                                                   nance of these facilities crucial to the U.S. economy.
                                                                                      Congress provided the Corps with authority to construct and
                                                                                   maintain the Nation’s approximately 1,067 Federal harbors and
                                                                                   shipping channels. These ports and harbors are categorized as high
                                                                                   use, moderate, and emerging, and defined by statute (section 210
                                                                                   of the Water Resources Development Act of 1986; 33 U.S.C. 2238)
                                                                                   based on how much tonnage is transited through individual ports.
                                                                                      According to the Corps, navigation channels at our Nation’s 59
                                                                                   ‘‘high use’’ ports are at their authorized depths less than 35 percent
                                                                                   of the time. A ‘‘high use’’ port is a port that handles more than 10
                                                                                   million tons of freight per year. The conditions of midsize or ‘‘mod-
                                                                                   erate’’ harbors (ports that handle between one million and ten mil-
                                                                                   lion tons of cargo) and ‘‘emerging’’ harbors (ports that handle one
                                                                                   million tons or less of cargo annually) are far worse. The dredging
                                                                                   needs of our ports will only continue to grow unless more resources
                                                                                   are devoted to maintenance dredging needs. The opening of the ex-
                                                                                   panded Panama Canal in June 2016 has already increased demand
                                                                                   for larger container ships to call on East and Gulf Coast ports.
                                                                                      In 2016, the Corps estimated the total cost to dredge and main-
                                                                                   tain authorized widths and depths of all Federal navigation
                                                                                   projects is $20.5 billion over the next decade. This estimate in-
                                                                                   cludes:
                                                                                           • $11.5 billion—to achieve authorized dimensions in the next
                                                                                        five years ($2.3 billion annually); and
                                                                                           • $9.0 billion—to maintain authorized dimensions for an ad-
                                                                                        ditional five years ($1.8 billion annually).
                                                                                      Moreover, total navigation needs are likely higher. The Corps’
                                                                                   $20.5 billion estimate includes additional expenses related to navi-
                                                                                   gation (e.g., construction of dredged material placement facilities).
                                                                                   However, this estimate does not likely include all necessary jetty
                                                                                   and breakwater work,2 or other needs identified by ports to main-
                                                                                   tain and expand harbor use nationwide.
                                                                                           The Harbor Maintenance Tax and Trust Fund
                                                                                      In 1986, Congress enacted the Harbor Maintenance Tax (HMT)
                                                                                   to recover the operation and maintenance dredging costs for com-
                                                                                   mercial ports from maritime shippers. The HMT is directly levied
                                                                                   on importers and domestic shippers using coastal or inland ports
                                                                                   as a 0.125 percent ad valorem tax on the value of imported cargo
                                                                                   (i.e., $1.25 per $1,000 value) 3 and is typically passed along to U.S.
                                                                                      1 See CRS Report R43222, ‘‘Harbor Maintenance Finance and Funding,’’ John Frittelli, Sep-
                                                                                   tember 12, 2013.
                                                                                      2 See Testimony of Kristin Meira, Executive Director, Pacific Northwest Waterways Associa-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   tion (PNWA) before the Committee on Transportation and Infrastructure, Hearing on ‘‘The Cost
                                                                                   of Doing Nothing: Why Investing in our Nation’s Infrastructure Cannot Wait,’’ February 7, 2019.
                                                                                      3 The Harbor Maintenance Tax initially applied to both imported and exported goods; however,
                                                                                   in 1998, the U.S. Supreme Court unanimously held that imposition of the tax on exported goods




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00056   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                                             57

                                                                                   taxpayers on the purchase of imported goods or services. These rev-
                                                                                   enues are deposited into the Harbor Maintenance Trust Fund
                                                                                   (HMTF) within the U.S. Treasury, from which Congress currently
                                                                                   appropriates funds to the Corps for harbor maintenance dredging.
                                                                                     As noted in Table 1, the HMTF has collected far more revenues
                                                                                   from shippers than Congress has appropriated to the Corps to
                                                                                   maintain our Nation’s harbors. Approximately $10 billion in al-
                                                                                   ready collected revenues sits unused for its intended purpose in the
                                                                                   U.S. Treasury, and according to Congressional Budget Office esti-
                                                                                   mates, based on current expenditure projections, the Trust Fund
                                                                                   balance could almost double in the next decade. As a result, while
                                                                                   shippers continue to pay into the HMTF for promised maintenance
                                                                                   activities, the Federal government has not carried out many of
                                                                                   them.
                                                                                   TABLE 1.—COLLECTIONS TO AND APPROPRIATIONS FROM HARBOR MAINTENANCE TRUST FUND (IN
                                                                                                           BILLIONS)—FISCAL YEARS 2016–2021 4
                                                                                                                                                  FY 2016    FY 2017   FY 2018    FY 2019   FY 2020      FY 2021

                                                                                   HMT Collections 5 ..........................................     $1.38      $1.47      $1.65     $1.76     $1.82      $1.91 (est.)
                                                                                   HMT Appropriations 6 ....................................         1.16       1.23       1.34      1.49      1.63           – – –
                                                                                   Est. EOY Balance in the HMTF ....................                 8.78       9.10       9.33      9.30     10.10           – – –

                                                                                      The funds sitting unused in the HMTF would be sufficient to
                                                                                   meet the maintenance dredging needs of all Federally authorized
                                                                                   ports. The Water Resources Reform and Development Act of 2014
                                                                                   (WRRDA 14) (P.L. 113–121) created discretionary appropriations
                                                                                   targets for expenditures from the Trust Fund, increasing each year,
                                                                                   so that by fiscal year 2025 and beyond, 100 percent of the funds
                                                                                   collected for harbor maintenance purposes would go towards re-
                                                                                   quired operation and maintenance activities. In recent fiscal years,
                                                                                   appropriations from the Trust Fund have exceeded the discre-
                                                                                   tionary targets outlined in WRRDA 14; however, Congress has not
                                                                                   yet achieved the goal of full utilization of Trust Fund collections.
                                                                                      The Committee, on a bipartisan basis, has approved legislation
                                                                                   to fully utilize HMT collections for their intended purpose of main-
                                                                                   tenance dredging four times7—the most recent of which (H.R. 2440,
                                                                                   the Full Utilization of the Harbor Maintenance Trust Fund Act)
                                                                                   was approved by the House under suspension of the rules by a vote
                                                                                   of 296 to 109 (roll call 585) on October, 28, 2019. Similarly, on
                                                                                   March 27, 2020, Congress approved H.R. 748, the CARES Act (Pub.
                                                                                   L. 116–136), which included a provision (section 14003 of division
                                                                                   B) that ensures that Federal appropriations from the Trust Fund

                                                                                   was a violation of the U.S. Constitution. See United States v. U.S. Shoe Corp., 523 U.S. 360
                                                                                   (1998).
                                                                                     4 Levels obtained from Budget Message of the President, Appendixes (fiscal years 2016–2021).
                                                                                     5 HMT Collections reflects the 0.125% HMT and the HMTF’s earnings on investments.
                                                                                     6 HMT Appropriations reflects the amounts appropriated for the operations and maintenance
                                                                                   costs of U.S. commercial navigation harbors and the amounts appropriated for the operations
                                                                                   and maintenance costs of the Saint Lawrence Seaway that are operated and maintained by the
                                                                                   Saint Lawrence Seaway Corporation. The number does not include any HMT appropriations for
                                                                                   activities on Mississippi Rivers and Tributaries projects or construction related activities cur-
                                                                                   rently eligible from the HMT (e.g. construction of dredged material disposal facilities that are
                                                                                   necessary for the operation and maintenance of any harbor or inland harbor).
                                                                                     7 Section 108 of H.R. 5303, the Water Resources Development Act of 2016 (As Reported to the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   House, 114th Congress), Section 102 of H.R. 8, the Water Resources Development Act of 2018
                                                                                   (As Reported to the House, 115th Congress), H.R. 2440, the Full Utilization of the Harbor Main-
                                                                                   tenance Trust Fund Act (116th Congress), and Section 101 of H.R. 7575, the Water Resources
                                                                                   Development Act of 2020 (116th Congress).




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006           PO 00000           Frm 00057         Fmt 6659    Sfmt 6602   E:\HR\OC\HR460P1.XXX        HR460P1
                                                                                                                                      58

                                                                                   are not counted against the annual discretionary budget cap up to
                                                                                   the level of the prior year’s deposits to the Trust Fund. However,
                                                                                   legislation to provide full access to the $10 billion currently sitting
                                                                                   idle in the Trust Fund has yet to be enacted into law. Enactment
                                                                                   of such a provision honors our Nation’s long-term commitment to
                                                                                   U.S. shippers and taxpayers for harbor maintenance dredging,
                                                                                   maintains and improves the competitiveness of U.S. businesses and
                                                                                   industry, and creates and sustains thousands of additional con-
                                                                                   struction jobs and jobs dependent on a vibrant and efficient marine
                                                                                   transportation system.
                                                                                          The Inland Waterways System
                                                                                      Inland waterways are a significant component of the Nation’s
                                                                                   maritime transportation system. These waterways carry approxi-
                                                                                   mately one-sixth of the national volume of intercity cargo on 25,000
                                                                                   miles of navigable waters throughout the United States. Of these
                                                                                   waters, approximately 12,000 miles make up the commercially ac-
                                                                                   tive inland and intracoastal waterways which are Federally man-
                                                                                   aged by the Corps.
                                                                                      The Federally managed inland waterway system is comprised of
                                                                                   237 lock chambers at 191 sites and is responsible for ports and wa-
                                                                                   terways in 41 states. The inland waterway system handles approxi-
                                                                                   mately half of all inland waterway freight (and one-twelfth of all
                                                                                   national freight). The Corps plans, develops, operates, and main-
                                                                                   tains the infrastructure of these commercial waterways (e.g., navi-
                                                                                   gation channels, harbors, and locks and dams), and maintains and
                                                                                   regulates the channel depths through dredging and water manage-
                                                                                   ment.
                                                                                      Beyond enabling commercial transportation, the inland water-
                                                                                   ways system may aid in flood control, provide a stable water supply
                                                                                   for nearby communities and industries, at some locations generate
                                                                                   hydropower, offer water recreation, provide for regional economic
                                                                                   development opportunities, and enhance national security capabili-
                                                                                   ties. These waterways are often in ecologically significant areas
                                                                                   and important to the survival of fish and wildlife, including several
                                                                                   listed species.
                                                                                          The Inland Waterways Trust Fund
                                                                                     The inland waterway system is facing significant challenges due
                                                                                   to aging infrastructure. Over half of the structures on the inland
                                                                                   waterways are more than 50 years old and nearly 40 percent are
                                                                                   more than 70 years old. Many of these projects are approaching the
                                                                                   end of their design lives and are in need of modernization or major
                                                                                   rehabilitation. Congress created the Inland Waterways Trust Fund
                                                                                   (IWTF) as a funding mechanism to invest in the construction, oper-
                                                                                   ation, and maintenance of the inland system.
                                                                                     The IWTF was authorized by two separate acts of Congress. The
                                                                                   original authorization was contained in the Inland Waterways Rev-
                                                                                   enue Act of 1978 (Public Law 95–502) (the 1978 Revenue Act).
                                                                                   Under the 1978 Revenue Act, Congress created the IWTF within
                                                                                   the U.S. Treasury for the purpose of supporting the construction
                                                                                   and rehabilitation of structures for navigation on the inland and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   coastal waterways of the United States. Congress funded the IWTF
                                                                                   with a tax on fuel used in commercial transportation on inland wa-
                                                                                   terways and statutorily defined 26 specific segments of the inland




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00058   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                                             59

                                                                                   and intracoastal waterways as being subject to the tax and being
                                                                                   eligible for construction and rehabilitation expenditures from the
                                                                                   IWTF.
                                                                                      The second piece of enabling legislation was the Water Resources
                                                                                   Development Act of 1986 (Public Law 99–662) (WRDA 1986). This
                                                                                   legislation reset the IWTF by a graduated increase in the inland
                                                                                   waterways commercial fuel tax rates, that was statutorily capped
                                                                                   at the current $0.20 per gallon tax; 8 added the Tennessee-
                                                                                   Tombigbee Waterway to the list of fuel-taxed inland and intra-
                                                                                   coastal waterways (now totaling 27 segments); implemented the
                                                                                   current funding and cost-share allocations; and authorized the con-
                                                                                   struction of eight new inland waterways system modernization
                                                                                   projects. Previously authorized projects and uncompleted projects
                                                                                   were allowed to continue at 100 percent Federal funding without
                                                                                   drawing from the IWTF.
                                                                                      As noted in Table 2, appropriations from the IWTF have nearly
                                                                                   matched estimated annual revenues into the IWTF since the in-
                                                                                   crease in diesel tax in 2015. Additionally, as annual revenues de-
                                                                                   posited into the IWTF continue to increase, the Corps has begun
                                                                                   to complete long-standing IWTF-supported projects, including
                                                                                   Olmsted Locks and Dam on the Ohio River, and LaGrange Lock
                                                                                   and Dam on the Illinois River.
                                                                                       TABLE 2.—COLLECTIONS TO AND APPROPRIATIONS FROM INLAND WATERWAYS TRUST FUND (IN
                                                                                                                  MILLIONS)—FY 2016–2021 9
                                                                                                                                                  FY 2016    FY 2017   FY 2018     FY 2019   FY 2020      FY 2021

                                                                                   IWTF Collections ...........................................    $111.1     $114.4      $116.8    $121.2    $114.0     $112.0 (est.)
                                                                                   IWTF Appropriations ......................................       108.0      108.4       112.0     110.7     131.1          – – –
                                                                                   Est. Balance in the IWTF .............................            57.4       63.4        40.4      33.3      55.0          – – –

                                                                                      In August 2019, the U.S. Department of Agriculture released a
                                                                                   report titled ‘‘Importance of Inland Waterways to U.S. Agri-
                                                                                   culture.’’ 10 The report analyzed three investment scenarios for in-
                                                                                   land waterways infrastructure and found that significant addi-
                                                                                   tional investment in the Nation’s inland waterways system is crit-
                                                                                   ical to maintaining the Nation’s global agricultural competitive-
                                                                                   ness.11 And while our inland waterway system moves many other
                                                                                   bulk commodities and raw materials at relatively low cost, WRDA
                                                                                   2020 includes a cost-share change that is intended to aid the con-
                                                                                   struction and rehabilitation of inland waterway projects.
                                                                                   Water Resources Project Resiliency Planning and Investment, Im-
                                                                                        provements to Flood Risk Reduction, and Affordability Chal-
                                                                                        lenges
                                                                                     Most of the Corps’ facilities and infrastructure were constructed
                                                                                   in the early to mid-1900s. For example, approximately 95 percent
                                                                                   of the dams managed by the Corps are more than 30 years old, and
                                                                                      8 The initial $0.20 per gallon diesel tax was increased to $0.29 per gallon by Pub. L. 113–295,
                                                                                   Division B, Title II, Section 205(a). However, unlike the ad valorem tax on imports that funds
                                                                                   the Harbor Maintenance Trust Fund, the fuel tax that funds the Inland Waterways Trust Fund
                                                                                   is not adjusted to reflect increases in inflation.
                                                                                      9 Levels obtained from Inland Waterways Users Board Annual Reports and Budget Message
                                                                                   of the President, Appendixes (fiscal years 2016–2021).




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                      10 U.S. Department of Agriculture, ‘‘Importance of Inland Waterways to U.S. Agriculture.’’
                                                                                   August 2019. https://www.ams.usda.gov/sites/default/files/media/ImportanceofInlandWater
                                                                                   waystoUSAgricultureFullReport.pdf
                                                                                      11 Id.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020    Jkt 099006           PO 00000           Frm 00059         Fmt 6659    Sfmt 6602    E:\HR\OC\HR460P1.XXX        HR460P1
                                                                                                                                      60

                                                                                   half have reached or exceeded their 50-year project lives. As noted
                                                                                   in witness testimonies before the Committee,12 much of our water
                                                                                   resources related infrastructure is reaching the end of its usable
                                                                                   life and has not been maintained or updated to address the water
                                                                                   resources challenges facing our communities today. Similarly, in
                                                                                   many areas of the country, there is no comprehensive management
                                                                                   of the inter-related systems of dams, levees, and other structures
                                                                                   that protect residents and their economy within a watershed—com-
                                                                                   plexity that can be compounded by observed changes in the fre-
                                                                                   quency and severity of weather events, precipitation patterns, and
                                                                                   drought.
                                                                                      The Corps’ ability to manage its portfolio of aging infrastructure
                                                                                   is coupled with the need to balance multiple authorized purposes
                                                                                   and increased demands on the infrastructure. The Corps’ infra-
                                                                                   structure faces challenges in the frequency in which extreme
                                                                                   weather events are occurring. As noted in witness testimony before
                                                                                   the Subcommittee on Water Resources and Environment, ‘‘resil-
                                                                                   iency is not a rigid, monolithic set of standards that can be easily
                                                                                   applied to every situation and every place.’’ 13 How the Corps fac-
                                                                                   tors the frequency of extreme weather events and the role of resil-
                                                                                   iency in the planning, design, construction, and operation and
                                                                                   maintenance of its facilities is crucial both to the long term sus-
                                                                                   tainability of the infrastructure and the communities they protect,
                                                                                   as well as the Corps’ ongoing responsibility to meet the authorized
                                                                                   purposes of Corps projects.
                                                                                      The Committee also received testimony in the challenges facing
                                                                                   economically disadvantaged communities, rural communities, and
                                                                                   tribal communities in addressing local water resources challenges.
                                                                                   For example, the Subcommittee on Water Resources and Environ-
                                                                                   ment heard from a witness, who expressed concern that ‘‘[con-
                                                                                   tinuing] reliance primarily on economic justification of projects
                                                                                   makes it difficult for those in rural and low-income areas to justify
                                                                                   projects that would give them considerable social and conceivably
                                                                                   health benefits.’’ 14 In response to these identified concerns, WRDA
                                                                                   2020 includes several provisions aimed at addressing the resiliency,
                                                                                   affordability, and process for evaluating future water resources de-
                                                                                   velopment projects.
                                                                                         Implementation of the Principles, Requirements and Guide-
                                                                                             lines
                                                                                     Since 1983, Federal water resources agencies, including the
                                                                                   Corps, have utilized a set of multi-agency guidelines that govern
                                                                                   how Federal agencies plan for, evaluate, and select proposed water
                                                                                     12 See e.g. Testimony of Gerald E. Galloway, PE, PhD, Acting Director, Center for Disaster
                                                                                   Resilience, A. James Clark School of Engineering, University of Maryland; testimony of Ann C.
                                                                                   Phillips, Rear Admiral, U.S. Navy (Retired), Special Assistant to the Governor of Virginia for
                                                                                   Coastal Adaptation and Protection; and testimony of Melissa Samet, Senior Water Resources
                                                                                   Counsel, National Wildlife Federation before the Committee on Transportation and Infrastruc-
                                                                                   ture, Hearing on ‘‘Concepts for the Next Water Resources Development Act: Promoting Resil-
                                                                                   iency of our Nation’s Water Resources Infrastructure,’’ November 19, 2019.
                                                                                     13 See Testimony of Julie A. Ufner, President, National Waterways Conference, Inc. before the
                                                                                   Committee on Transportation and Infrastructure, Hearing on ‘‘Concepts for the Next Water Re-
                                                                                   sources Development Act: Promoting Resiliency of our Nation’s Water Resources Infrastructure,’’
                                                                                   November 19, 2019.
                                                                                     14 See Testimony of Gerald E. Galloway, PE, PhD, Acting Director, Center for Disaster Resil-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   ience, A. James Clark School of Engineering, University of Maryland before the Committee on
                                                                                   Transportation and Infrastructure, Hearing on ‘‘Concepts for the Next Water Resources Develop-
                                                                                   ment Act: Promoting Resiliency of our Nation’s Water Resources Infrastructure,’’ November 19,
                                                                                   2019.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00060   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      61

                                                                                   resources development projects, including projects related to navi-
                                                                                   gation, storm resilience, wetland restoration, and flood prevention.
                                                                                   However, the standards established and used since 1983 (Prin-
                                                                                   ciples and Guidelines) use a narrow set of parameters to evaluate
                                                                                   the benefits of water investments that limit the ability of Federal
                                                                                   agencies to support a broader range of projects for communities.
                                                                                     The Water Resources Development Act of 2007 called for revi-
                                                                                   sions to the 1983 Principles and Guidelines.15 In 2013, the Council
                                                                                   for Environmental Quality (CEQ) issued these revisions, now called
                                                                                   the Principles, Requirements and Guidelines for Water and Land
                                                                                   Related Resources Implementation Studies (PR&G). The PR&G re-
                                                                                   vise and replace the 1983 Principles and Guidelines and were in-
                                                                                   tended to apply to all Federal water resources agencies to establish
                                                                                   new, comprehensive policy and guidance for Federal investments in
                                                                                   water resources. However, while other Federal agencies have since
                                                                                   adopted the PR&G, the Corps has not yet adopted these revisions.
                                                                                     WRDA 2020 includes language directing the Secretary to issue
                                                                                   agency-specific procedures for adoption of the PR&G. The Corps’
                                                                                   adoption and implementation of the PR&G will increase consist-
                                                                                   ency and compatibility in water resources investment decision
                                                                                   making. The PR&G updates how the Corps analyzes Federal in-
                                                                                   vestments that impact water resources and allows the Corps to
                                                                                   more broadly consider the economic, environmental, and social im-
                                                                                   pacts of a project. Adoption of the PR&G will also promote better
                                                                                   investment of taxpayer dollars by directing the Corps to analyze a
                                                                                   broader range of long-term costs and benefits, will give stake-
                                                                                   holders a greater voice through enhanced collaboration, and will
                                                                                   allow for utilization of resilient approaches to address local water
                                                                                   resources challenges posed by observed changes in the frequency
                                                                                   and severity of weather events, precipitation patterns, and drought.
                                                                                          Affordability of Corps Studies and Projects
                                                                                     During the formulation of WRDA 2020, the Subcommittee on
                                                                                   Water Resources and Environment held several hearings and
                                                                                   roundtables to hear from stakeholders on challenges facing the de-
                                                                                   velopment and implementation of water resources development
                                                                                   projects. A recurring theme during these hearings and roundtables
                                                                                   was concern on the inequitable treatment of communities in ad-
                                                                                   dressing local water resources challenges based on their ability or
                                                                                   economic capability to partner with the Corps. For example, in the
                                                                                   Subcommittee’s November 2019 hearing, a witness highlighted in
                                                                                   his testimony the ‘‘inequitable treatment in providing flood risk re-
                                                                                   duction to low-income communities,’’ which he described as ‘‘most
                                                                                   obvious in low-income areas across the nation and results from the
                                                                                   criteria we use to develop and approve projects and programs.’’ 16
                                                                                     In response, WRDA 2020 contains several provisions that aim at
                                                                                   both increasing the ability of economically disadvantaged commu-
                                                                                   nities, rural communities, and minority and tribal communities to
                                                                                   utilize the Corps in addressing local water resources development
                                                                                   challenges, as well as to ensure that these communities are ac-
                                                                                       15 Section 2031 of the Water Resources Development Act of 2007 (42 U.S.C. 1962–3).
                                                                                     16 See Testimony of Gerald E. Galloway, PE, PhD, Acting Director, Center for Disaster Resil-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   ience, A. James Clark School of Engineering, University of Maryland before the Committee on
                                                                                   Transportation and Infrastructure, Hearing on ‘‘Concepts for the Next Water Resources Develop-
                                                                                   ment Act: Promoting Resiliency of our Nation’s Water Resources Infrastructure,’’ November 19,
                                                                                   2019.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00061   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      62

                                                                                   tively included in discussions related to addressing water resources
                                                                                   development projects and activities that affect them. In this regard,
                                                                                   WRDA 2020 includes:
                                                                                           • A pilot program to evaluate opportunities to address the
                                                                                        flood risk management and hurricane and storm damage risk
                                                                                        reduction needs, including the needs of economically disadvan-
                                                                                        taged communities.
                                                                                           • Authority that allows the Corps to engage in pre-feasibility
                                                                                        study discussions with non-Federal interests for projects bene-
                                                                                        fitting an economically disadvantaged community.
                                                                                           • Prioritization of existing flood plain management services
                                                                                        authorities under section 206 of the Flood Control Act of 1960
                                                                                        for economically disadvantaged communities.
                                                                                          Improvements to Flood Risk Reduction
                                                                                      During the formulation of WRDA 2020, the Subcommittee on
                                                                                   Water Resources and Environment held several hearings and
                                                                                   roundtables to hear from stakeholders on challenges facing the de-
                                                                                   velopment and implementation of water resources development
                                                                                   projects. Another recurring theme during these hearings and
                                                                                   roundtables was concern on the repeated flooding impacts on com-
                                                                                   munities and the inadequate maintenance of our Nation’s flood risk
                                                                                   management infrastructure. For example, in the Subcommittee’s
                                                                                   July 2019 hearing, a witness highlighted in his testimony the dev-
                                                                                   astating impacts of the 2019 Missouri River Floods and reminded
                                                                                   that flooding does not discriminate and touches every part of our
                                                                                   Nation.17
                                                                                      To that end, WRDA 2020 includes important river basin-wide
                                                                                   comprehensive flood risk reduction studies for the Lower Missouri
                                                                                   River, Upper and Lower Mississippi River, the Great Lakes, and
                                                                                   the Yolo River. Additionally, this Act provides new authority for
                                                                                   permanent construction solutions for communities that experience
                                                                                   repetitive loss as a result of flooding and allows inactive non-Fed-
                                                                                   eral interests in the P.L. 84–99 program an opportunity to become
                                                                                   eligible for assistance post-disaster, under certain conditions.
                                                                                   Other Policy Matters
                                                                                     The transformative nature of the last three WRDA bills on the
                                                                                   Corps Civil Works Program has provided the Corps and the non-
                                                                                   Federal sponsors with a tremendous number of new opportunities
                                                                                   for advancing projects more quickly. The Committee expects the
                                                                                   Corps to continue to issue implementation guidance on the new
                                                                                   provisions contained in this bill in an expeditious and transparent
                                                                                   manner, and where appropriate, to solicit the view of, and consult
                                                                                   with, a wide array of stakeholders in the formulation of implemen-
                                                                                   tation guidance.
                                                                                     However, the Committee remains concerned that the Corps has
                                                                                   yet to complete implementation guidance on several provisions en-
                                                                                   acted in the last few WRDA bills. For example, the Committee has
                                                                                   received requests related to delayed implementation guidance re-
                                                                                   lated to the following enacted provisions: section 1043(a) of
                                                                                   WRRDA 14; section 3029(a)(1) of WRRDA 14; and section 1176 of




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     17 See Testimony of Tom Waters, Chairman, Missouri Levee and Drainage District Association
                                                                                   before the Committee on Transportation and Infrastructure, Hearing on ‘‘Water Resources De-
                                                                                   velopment Acts: Status of Implementation and Assessing Future Needs,’’ July 10, 2019.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00062   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      63

                                                                                   WRDA 2016. The Committee expects the Corps to complete imple-
                                                                                   mentation guidance for these and any other WRDA provision en-
                                                                                   acted by Congress within the next 90 days.
                                                                                      The Committee received several requests related to the potential
                                                                                   modification of lock and dam structures on the inland waterways
                                                                                   system to allow for remote operations. The Committee is aware of
                                                                                   an ongoing study being carried out by the Corps examining the au-
                                                                                   tomation of lock and dam structures on the Ohio River Navigation
                                                                                   System. This study will include all 55 locks within the Great Lakes
                                                                                   and Ohio River Division of the Corps, including 19 locks on the
                                                                                   Ohio River and 36 locks on its seven navigable tributaries. Once
                                                                                   initiated, this study is authorized to be carried out at Federal ex-
                                                                                   pense, and the Corps expects the study to last approximately three
                                                                                   years. In carrying out this study, the Committee would remind the
                                                                                   Secretary of recent Congressional action to statutorily declare
                                                                                   Corps lock and dam employees as inherently governmental, and di-
                                                                                   rects the Secretary to examine any potential workforce impacts of
                                                                                   automation and ensure that any recommendations in a completed
                                                                                   study will not result in the loss of jobs for current lock and dam
                                                                                   employees.
                                                                                      The Committee is aware that the Corps has approved and imple-
                                                                                   mented a major deviation for Forecast Informed Reservoir Oper-
                                                                                   ations (FIRO) at Lake Mendocino in the Russian River Valley in
                                                                                   northern California. Since 2014, the Corps has been involved in a
                                                                                   robust interagency group to investigate how weather forecast infor-
                                                                                   mation can inform and improve water management decisions at
                                                                                   Corps reservoirs. The Committee understands that, based on the
                                                                                   results of the major deviation and the ongoing work to improve and
                                                                                   implement forecasting, the Corps has the intent of incorporating
                                                                                   FIRO into water management by updating the Lake Mendocino
                                                                                   water control manual. The Committee reminds the Corps that
                                                                                   there is also an authorized feasibility study for raising the Coyote
                                                                                   Valley Dam at Lake Mendocino (which section 202(a) of WRDA
                                                                                   2020 directs the Corps to expedite completion of) which could pro-
                                                                                   vide further benefits for water supply reliability and environmental
                                                                                   conditions in the Russia River, while still ensuring flood manage-
                                                                                   ment capacity of the reservoir, that could also be part of incor-
                                                                                   porating FIRO into the Lake Mendocino water control manual.
                                                                                      The Committee received several requests related to the Corps’
                                                                                   use of its existing authority to perform advance maintenance of the
                                                                                   Nation’s Federally authorized navigation channels. These channels
                                                                                   are essential to keeping the international supply chain open and
                                                                                   operating efficiently during this period of economic recovery. The
                                                                                   Corps is strongly urged to make optimum use of available authori-
                                                                                   ties to ensure that these waterways are adequately maintained and
                                                                                   able to accommodate global shipping needs and generate economic
                                                                                   benefits during this critical time. The use of advance maintenance
                                                                                   can be particularly impactful in channels with high shoaling areas.
                                                                                   As these areas naturally silt in over time and are especially vulner-
                                                                                   able to the advent of more intense storms, repeated advance main-
                                                                                   tenance efforts may be necessary to guard against depth reductions




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   which can lead to draft restrictions for larger global vessels. The
                                                                                   Corps is encouraged to fully and consistently maintain Federal
                                                                                   channels at their approved advance maintenance depth.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00063   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      64

                                                                                      The Committee recognizes the critical importance of water re-
                                                                                   sources development projects to the national, regional, and local
                                                                                   economies of this country. However, many times, finding up-to-date
                                                                                   information about Corps projects and studies is difficult. The Corps
                                                                                   is encouraged to generate annual reports on the status of projects
                                                                                   and studies by Congressional district, and to make these reports
                                                                                   available to the public and accessible online.
                                                                                      During the Subcommittee on Water Resources and Environ-
                                                                                   ment’s March 2020 roundtable event in Baldwin Park, California,
                                                                                   the Subcommittee had the opportunity to conduct a site visit of the
                                                                                   dam safety modifications for the Whittier Narrows Dam. At that
                                                                                   same roundtable, the Subcommittee heard testimony on how the
                                                                                   Corps’ dam safety construction activities would negatively impact
                                                                                   certain recreational facilities located in the City of Pico Rivera,
                                                                                   California. While timely completion of the dam safety activities at
                                                                                   Whittier Narrows Dam must remain the Corps highest priority, the
                                                                                   Corps is encouraged to work with the City of Pico Rivera to find
                                                                                   ways to mitigate the project’s impact on the recreational facilities
                                                                                   utilized by the surrounding community.
                                                                                      The Committee has also received an update on efforts to restore
                                                                                   the riverine ecosystem related to the Blackstone River, Rhode Is-
                                                                                   land. The Committee is aware that restoration activities are being
                                                                                   carried out both by the U.S. Department of Agriculture, Natural
                                                                                   Resources Conservation Service (NRCS) and the Corps to address
                                                                                   fish passage issue associated with the Main Street Dam, which has
                                                                                   been identified as a potential aquatic ecosystem restoration project
                                                                                   under section 206 of the Water Resources Development Act of 1996
                                                                                   (33 U.S.C. 2330). The Committee encourages the Corps to corrobo-
                                                                                   rate its restoration activities on the Blackstone River with NRCS
                                                                                   and the non-Federal interests to promote a comprehensive aquatic
                                                                                   ecosystem restoration effort on the river.
                                                                                      The Committee has received information from the Corps on the
                                                                                   approximately 2,000 employees of the Corps who wear a Corps’
                                                                                   Park Ranger uniform and perform critical roles for the American
                                                                                   public, including flood fighting, forestry management, fish and
                                                                                   wildlife management, shoreline management, environmental com-
                                                                                   pliance, protecting park boundaries and flowage easements, real es-
                                                                                   tate activities, water safety, sign management, volunteer manage-
                                                                                   ment, fee collection, and visitor center management. Generally
                                                                                   speaking, the Committee does not support any effort to outsource
                                                                                   existing positions carried out by Corps Federal employees, includ-
                                                                                   ing the Corps’ Park Rangers. The Committee is aware of three sep-
                                                                                   arate efforts (in 1984, in 1990, and in 2005) where the Executive
                                                                                   branch as undertaken an A–76 review of Corps Park Rangers,18
                                                                                   and in each instance, Corps leadership has recommended the ex-
                                                                                   emption of Corps Park Rangers from potential outsourcing. In the
                                                                                   last of these A–76 reviews (2003 through 2005), the former Chief
                                                                                   of Engineers, LTG Robert B. Flowers, recommended that the Sec-
                                                                                   retary reclassify the Park Ranger position as an inherently govern-
                                                                                   mental function, based on the Park Rangers’ arrest and regulatory
                                                                                   authorities. The Committee strongly encourages the Secretary to
                                                                                   complete this effort and administratively reclassify the Park Rang-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     18 The A–76 review process is undertaken pursuant to the Office of Management and Budget
                                                                                   (OMB) Circular No. A–76, which establishes Executive branch policy for the competition of com-
                                                                                   mercial activities.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00064   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      65

                                                                                   er position as an inherently governmental function, based on pre-
                                                                                   vious reviews of this issue.
                                                                                      Over the past few WRDAs, Congress has enacted several provi-
                                                                                   sions to both encourage interagency partnerships in addressing
                                                                                   local water resources challenges, as well as promoting efforts to,
                                                                                   where appropriate, utilize natural, nature-based, or integrated ef-
                                                                                   forts to address local stormwater challenges. WRDA 2020 builds on
                                                                                   that effort by continuing to promote comprehensive measures to
                                                                                   carry out multi-purpose projects that seek to produce multiple
                                                                                   project benefits. The Committee believes that this comprehensive
                                                                                   approach can also be integrated into Corps construction-related
                                                                                   partnerships with other Federal agencies. The Committee is aware
                                                                                   of a partnership among the Corps, the Federal Emergency Manage-
                                                                                   ment Agency (FEMA), the U.S. Department of Housing and Urban
                                                                                   Development, and the Federally-supported Dallas-Fort Worth Met-
                                                                                   ropolitan Planning Organization, specifically the North Central
                                                                                   Texas Council of Governments, to address local stormwater chal-
                                                                                   lenges associated with regional infrastructure initiatives. The Com-
                                                                                   mittee encourages the Corps to work with other Federal agencies
                                                                                   and State partners in this effort that seeks to prevent adverse im-
                                                                                   pacts to major precipitation events, rather than simply to respond
                                                                                   to such events.
                                                                                      The Committee notes that construction of the project for control,
                                                                                   Santa Barbara Streams, Lower Mission Creek, California (114
                                                                                   Stat. 2577; 121 Stat. 1114), was initiated by over $18 million in
                                                                                   non-Federal resources, which included funds from a voter approved
                                                                                   benefit assessment measure; however, the project has not received
                                                                                   Federal construction funding. The Committee encourages the Corps
                                                                                   to initiate a reevaluation study of the project in order to account
                                                                                   for population growth, property values, and any new disaster
                                                                                   threats associated with the project area.
                                                                                      The Committee has heard concern related to the process by
                                                                                   which the Corps procures dredging services on the West Coast, in-
                                                                                   cluding questions on the Corps’ utilization of small business set-
                                                                                   asides for procuring dredging contracts. An amendment (#9), of-
                                                                                   fered and withdrawn by Mr. Garamendi, would have directed the
                                                                                   Corps to develop a report on the aggregate contract award amounts
                                                                                   to small business concerns within each of the mission areas of the
                                                                                   Corps (Civil Works). The Committee directs the Secretary to com-
                                                                                   pile, and transmit to the Committee within 90 days, a report iden-
                                                                                   tifying, by dollar value for each mission area of the Corps’ Civil
                                                                                   Works responsibility, the total number of awards or contracts to
                                                                                   small business concerns (as such term is defined in section 3(a) of
                                                                                   the Small Business Act) for each Division of the Corps over the
                                                                                   past five fiscal years.
                                                                                      The Committee is aware of significant shoreline sloughing and
                                                                                   erosion associated with the Okatibbee Lake, Mississippi project,
                                                                                   caused by severe storms and the resulting changing water levels,
                                                                                   which have the potential to impact infrastructure, damage prop-
                                                                                   erty, and put lives at risk. The Corps is reminded that addressing
                                                                                   shoreline sloughing and erosion at a Corps project, including at lo-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   cations leased by non-Federal entities, is an activity eligible to com-
                                                                                   pete for additional operation and maintenance funding through the
                                                                                   Corps’ budget workplan.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00065   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      66

                                                                                      The Success Reservoir Enlargement Project was authorized by
                                                                                   section 101(b)(4) of the Water Resources Development Act of 1999
                                                                                   to improve both flood damage protection and water supply. The
                                                                                   Committee encourages the Corps to continue to work expeditiously
                                                                                   to advance this to completion.
                                                                                      The Committee encourages the Corps to expeditiously carry out
                                                                                   its obligation to provide beach nourishment to the shoreline and af-
                                                                                   fected beaches south of the New Buffalo Harbor, as authorized
                                                                                   under section 101 of the Rivers and Harbors Act of 1962 (P.L. 87–
                                                                                   874; 76 Stat. 1176).
                                                                                      The Committee encourages the Corps to consult with and gather
                                                                                   comments from Missouri River Basin State Governors and other
                                                                                   stakeholders before determining whether a change or update to the
                                                                                   Missouri River Master Water Control Manual is administrative or
                                                                                   substantial in nature.
                                                                                      The Committee is aware that there is disagreement about wheth-
                                                                                   er the Corps is meeting the Congressional intent of Section 1319
                                                                                   of WRDA 2016 (130 Stat. 1703) and commits to working towards
                                                                                   finding a mutually-agreeable solution regarding the environmental
                                                                                   mitigation features related to the Savannah Harbor Expansion
                                                                                   Project at or below the New Savannah Bluff Lock and Dam. The
                                                                                   Committee recognizes that the pool of water behind the Dam is
                                                                                   currently utilized for municipal and industrial water supplies for
                                                                                   Augusta, Georgia and North Augusta, South Carolina communities,
                                                                                   as well as local recreational activities. The Committee also recog-
                                                                                   nizes the local communities of the City of Augusta, Georgia, and
                                                                                   the City of North Augusta, South Carolina, are willing to take over
                                                                                   the New Savannah Bluff Lock and Dam and have passed resolu-
                                                                                   tions in support of legislative language to turn over the New Sa-
                                                                                   vannah Bluff Lock and Dam to the local communities and accom-
                                                                                   modate downstream fish mitigation. The Committee further recog-
                                                                                   nizes that an agreement is currently in place between the Corps,
                                                                                   the Georgia Ports Authority, the South Carolina Department of
                                                                                   Health and Environmental Control, the Savannah River Maritime
                                                                                   Commission, and conservation organizations that requires the de-
                                                                                   velopment of a fish passage strategy at New Savannah Bluff Lock
                                                                                   and Dam. The Committee encourages all the parties involved to
                                                                                   continue to work together to resolve the issues related to this
                                                                                   project.
                                                                                      The Committee encourages the Corps to work with non-Federal
                                                                                   interests to credit an equitable value of any real property necessary
                                                                                   to support a project, regardless of how the property was acquired
                                                                                   by the non-Federal interest, provided that such credit is permitted
                                                                                   under current law.
                                                                                      The FY 2020 Corps Work Plan included a new start for a Gen-
                                                                                   eral Investigations study of the Lower Missouri River Basin for the
                                                                                   purpose of flood risk reduction. Section 210 of this Act is intended
                                                                                   to build off this existing authority to expeditiously review both a
                                                                                   comprehensive plan and site-specific solutions to combat flooding in
                                                                                   communities Basin-wide. While this Act specifically and preemp-
                                                                                   tively waives 3x3x3 requirements, the Committee strongly encour-
                                                                                   ages the Corps to complete its studies as expeditiously as possible.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                      The Committee renews its focus on the Caño Martı́n Peña Eco-
                                                                                   system Restoration Project planned for urban San Juan, Puerto
                                                                                   Rico. The Committee continues to recognize the significance of this




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00066   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      67

                                                                                   project for the economic revitalization, public health, and incidental
                                                                                   flood protection of the eight communities surrounding this histori-
                                                                                   cally important tidal channel as well as for the re-establishment of
                                                                                   the natural tidal exchange between the San Jose Lagoon and the
                                                                                   San Juan Bay, two bodies of water with ecologically significant
                                                                                   habitat for native species and ecosystem function. The Committee
                                                                                   further recognizes the substantial time and effort dedicated across
                                                                                   the past three decades by the non-Federal sponsor to plan this
                                                                                   project in coordination with the Corps, and the meaningful
                                                                                   progress made in recent years to secure its authorization and pre-
                                                                                   pare it for the construction phase. The Committee encourages the
                                                                                   Corps to consider this important project in the formulation of fu-
                                                                                   ture budget requests. The Corps is directed to report to the Com-
                                                                                   mittee no later than 30 days after enactment of this Act on the sta-
                                                                                   tus of, and its future plans, for this project. The report should in-
                                                                                   clude identification of any circumstances that may be
                                                                                   disadvantaging this project from selection as a new construction
                                                                                   start.
                                                                                      The Committee received requests related to the ability of non-
                                                                                   Federal interests to contribute funds to the Corps to assist in the
                                                                                   maintenance of Federal navigation channels. The Committee notes
                                                                                   that the Corps has existing authority to accept non-Federal con-
                                                                                   tributions under section 210 of WRDA 1986, as amended (33 U.S.C.
                                                                                   2238) and section 2106 of WRRDA 14, as amended (33 U.S.C
                                                                                   2238c), as well as separate work authority under 33 U.S.C. 701h,
                                                                                   that allows the Corps to undertake work in connection with dredg-
                                                                                   ing of a Federal navigation project. The Committee encourages the
                                                                                   Corps to utilize these authorities as requested by non-Federal in-
                                                                                   terests.
                                                                                      The Committee received a request related to the legal obligation
                                                                                   of the Corps to obtain easements related to coastal storm risk man-
                                                                                   agement projects that benefit privately-owned beaches and shore-
                                                                                   lines. Section 103(d) of WRDA 86 and the Act of June 28, 1956 (33
                                                                                   U.S.C. 426e(d)) condition Federal financial participation in coastal
                                                                                   storm risk management projects that benefit privately-owned
                                                                                   beaches and shorelines on public use of, and access to, the beach
                                                                                   and shoreline. According to the Corps, since the 1990s, it has re-
                                                                                   quired non-Federal interests for coastal storm risk management
                                                                                   projects involving nourishment of privately-owned beaches to ac-
                                                                                   quire a standard perpetual easement that provides the right of ac-
                                                                                   cess to construct, operate, maintain, periodically renourish, and re-
                                                                                   store the project, but also a right of use and access to the public.
                                                                                   The Committee has heard concerns from communities on the dif-
                                                                                   ficulty in obtaining an easement from each and every private land-
                                                                                   owner associated with a coastal storm risk management project, es-
                                                                                   pecially in areas where multiple owners can own a share of the
                                                                                   properties (e.g. apartment units or condominiums) which can re-
                                                                                   quire non-Federal sponsors to obtain the concurrence of every
                                                                                   owner in the facility. The Committee is committed to the concepts
                                                                                   of public use and access to beaches and shorelines that are finan-
                                                                                   cially-supported by U.S. taxpayers; however, the Committee also
                                                                                   understands the challenges facing local governments in obtaining




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   the necessary approvals for required easements. The Committee
                                                                                   encourages the Corps to work with local governments on ways to
                                                                                   address the legal requirements of obtaining necessary approvals,




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00067   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      68

                                                                                   while respecting some of the logistical challenges facing local gov-
                                                                                   ernments.
                                                                                                                              HEARINGS
                                                                                      For the purposes of section 103(i) of H. Res. 6 of the 116th Con-
                                                                                   gress—
                                                                                      (1) The following hearings were used to develop or consider H.R.
                                                                                   7575:
                                                                                      On April 10, 2019, the Subcommittee on Water Resources and
                                                                                   Environment held a hearing entitled, ‘‘The Cost of Doing Nothing:
                                                                                   Why Full Utilization of the Harbor Maintenance Trust Fund and
                                                                                   Investment in our Nation’s Waterways Matter.’’ The Subcommittee
                                                                                   received testimony from Rick Goche, Commissioner of the Port of
                                                                                   Bandon; Eugene Seroka, Executive Director of the Port of Los An-
                                                                                   geles; Bonnie Brady, Executive Director of the Long Island Com-
                                                                                   mercial Fishing Association; Kevin Ross, the First Vice President
                                                                                   of The National Corn Growers Association; Phyllis Harden, Legisla-
                                                                                   tive and Special Projects for Pine Bluff Sand and Gravel Co.; Peter
                                                                                   H. Stephaich, Chairman of the Campbell Transportation Company;
                                                                                   and Kirsten Wallace, the Executive Director of the Upper Mis-
                                                                                   sissippi River Basin Association. Testimony focused on the role that
                                                                                   ports, harbors, and inland waterways play in our communities and
                                                                                   their economies.
                                                                                      On July 10, 2019, the Subcommittee on Water Resources and En-
                                                                                   vironment held a hearing entitled, ‘‘Water Resources Development
                                                                                   Acts: Status of Implementation and Assessing Future Needs.’’ The
                                                                                   Subcommittee received testimony from the Honorable R.D. James,
                                                                                   Assistant Secretary of the Army (Civil Works); Major General Scott
                                                                                   A. Spellmon, Deputy Commanding General for Civil and Emer-
                                                                                   gency Operations; Rob Innis, Plant Manager for Sparrows Point
                                                                                   Lafarge-Holcim; Chad Berginnis, Executive Director of the Associa-
                                                                                   tion of State Floodplain Managers; Tom Waters, Chairman of the
                                                                                   Missouri Levee and Drainage District Association; Julie Hill-Ga-
                                                                                   briel, Vice President for Water Conservation for The National Au-
                                                                                   dubon Society; Derek Brockbank, Executive Director of the Amer-
                                                                                   ican Shore and Beach Preservation Association; Marty Ralph, PhD,
                                                                                   Director of the Center for Western Weather and Water Extremes
                                                                                   at the Scripps Institution of Oceanography at UC San Diego. Testi-
                                                                                   mony focused on the Corps’ implementation of previous Water Re-
                                                                                   source Development Acts and their effect on impacted stakeholders,
                                                                                   as well as potential areas of concern to be considered in future
                                                                                   water resource development bills.
                                                                                      On November 19, 2019, the Subcommittee on Water Resources
                                                                                   and Environment held a hearing entitled, ‘‘Concepts for the Next
                                                                                   Water Resources Development Act: Promoting Resiliency of our Na-
                                                                                   tion’s Water Resources Infrastructure.’’ The Subcommittee received
                                                                                   testimony from Dr. Gerald Galloway, Glenn L. Martin Institute
                                                                                   Professor of Engineering at the University of Maryland; Ann Phil-
                                                                                   lips, Special Assistant to the Governor for Coastal Adaptation and
                                                                                   Protection, Commonwealth of Virginia; Ricardo Pineda, Chair of
                                                                                   the Association of State Floodplain Managers; Dr. Louis Gritzo,
                                                                                   Vice President of FM Global Research Manager; Melissa Samet,




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Senior Water Resources Counsel at the National Wildlife Federa-
                                                                                   tion; and Julie Ufner, President of the National Waterways Con-
                                                                                   ference. Testimony examined how concepts of resiliency are incor-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00068   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      69

                                                                                   porated in the planning, design, construction, and operation of ex-
                                                                                   isting Corps projects; how existing infrastructure is maintained to
                                                                                   simultaneously address their purposes and prepare for future ex-
                                                                                   treme hydrologic conditions; and where the Corps could further im-
                                                                                   plement resiliency strategies and conference into their Civil Works
                                                                                   portfolio.
                                                                                      On January 9, 2020, the Subcommittee on Water Resources and
                                                                                   Environment held a hearing entitled, ‘‘Proposals for a Water Re-
                                                                                   sources Development Act of 2020.’’ The Subcommittee received testi-
                                                                                   mony directly from the Corps on pending or potential project stud-
                                                                                   ies, authorizations, and modifications; as well as on policy initia-
                                                                                   tives that would benefit Corps projects and functions. The wit-
                                                                                   nesses from the Corps were the Assistant Secretary of the Army for
                                                                                   Civil Works, the Honorable R.D. James; and the Chief of Engineers
                                                                                   and Commanding General for the Corps, Lieutenant General Todd
                                                                                   Semonite.
                                                                                      On February 27, 2020, the Subcommittee on Water Resources
                                                                                   and Environment held a hearing entitled, ‘‘Proposals for a Water
                                                                                   Resources Development Act of 2020: Members’ Day Hearing.’’ This
                                                                                   hearing featured testimony from Members of Congress on Corps
                                                                                   studies and projects important to their districts and policies di-
                                                                                   rectly impacting their constituents. In total, 47 Members testified
                                                                                   before the Subcommittee, with another 25 also submitting their
                                                                                   testimony for the hearing record.
                                                                                      (2) The following related roundtables were held:
                                                                                      On October 19, 2019, the Subcommittee on Water Resources and
                                                                                   Environment held a roundtable event in Islamorada, Florida enti-
                                                                                   tled, ‘‘America’s Water Resources Infrastructure: Concepts for the
                                                                                   Next Water Resources Development Act.’’ Topics of discussion in-
                                                                                   cluded the unique challenges in navigation and ecosystem restora-
                                                                                   tion that communities face in Florida, and the role that resilient
                                                                                   planning and infrastructure could play in these communities.
                                                                                      On March 6, 2020, the Subcommittee held a roundtable event in
                                                                                   Baldwin Park, California, entitled, ‘‘America’s Water Resources In-
                                                                                   frastructure: Concepts for the Next Water Resources Development
                                                                                   Act.’’ Topics of discussion included the unique water resources chal-
                                                                                   lenges in California related to flood control, water supply, and eco-
                                                                                   system restoration.
                                                                                                      LEGISLATIVE HISTORY AND CONSIDERATION
                                                                                     On July 13, 2020, House Committee on Transportation and In-
                                                                                   frastructure Chairman Peter A. DeFazio (D–OR), Ranking Member
                                                                                   Sam Graves (R–MO), Subcommittee on Water Resources and Envi-
                                                                                   ronment Chairwoman Grace F. Napolitano (D–CA), and Sub-
                                                                                   committee Ranking Member Bruce Westerman (R–AR) introduced
                                                                                   H.R. 7575, the Water Resources Development Act of 2020.
                                                                                     The bill was primarily referred to the Committee on Transpor-
                                                                                   tation and Infrastructure, and additionally referred to the Com-
                                                                                   mittee on the Budget. Within the Committee on Transportation
                                                                                   and Infrastructure, H.R. 7575 was referred to the Subcommittee on
                                                                                   Water Resources and Environment.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     On July 15, 2020, the Chair discharged the Subcommittee on
                                                                                   Water Resources and Environment from further consideration of
                                                                                   H.R. 7575.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00069   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      70

                                                                                     On July 15, 2020, the Committee on Transportation and Infra-
                                                                                   structure met in open session to consider H.R. 7575 and ordered
                                                                                   the measure to be reported to the House with favorable rec-
                                                                                   ommendation, as amended, by voice vote with a quorum present.
                                                                                     The following amendments were offered:
                                                                                     An amendment offered by Mr. DeFazio (#1); was AGREED TO by
                                                                                   voice vote.
                                                                                           Page 17, beginning on line 4, strike ‘‘a project to which
                                                                                       such section applies’’ and insert ‘‘any project for navigation
                                                                                       on the inland waterways’’.
                                                                                           Page 24, after line 10, insert a new paragraph entitled
                                                                                       ‘‘(3) State.’’
                                                                                           Page 26, strike lines 17 through 24 and insert the fol-
                                                                                       lowing:
                                                                                           (2) in paragraph (1)—
                                                                                           (A) by striking ‘‘nonstructural flood control measures’’
                                                                                       and inserting ‘‘a flood risk management or hurricane and
                                                                                       storm damage risk reduction measure using a non-
                                                                                       structural feature, or a natural feature or nature-based
                                                                                       feature (as those terms are defined in section 1184(a) of
                                                                                       the Water Resources Development Act of 2016 (33 U.S.C.
                                                                                       2289a(a)),’’; and
                                                                                           (B) by striking ‘‘cash during construction of the project’’
                                                                                       and inserting ‘‘cash during construction for a nonstructural
                                                                                       feature if the costs of land, easements, rights-of-way,
                                                                                       dredged material disposal areas, and relocations for such
                                                                                       feature are estimated to exceed 35 percent’’.
                                                                                           Page 32, line 17, insert ‘‘(or county-equivalent entity or
                                                                                       entities)’’ after ‘‘counties’’.
                                                                                           Page 32, line 22, insert ‘‘(or county-equivalent entity or
                                                                                       entities)’’ after ‘‘counties’’.
                                                                                           Page 33, line 3, insert ‘‘(or county-equivalent entity or
                                                                                       entities)’’ after ‘‘counties’’.
                                                                                           Page 35, after line 10, insert a new subsection entitled
                                                                                       ‘‘(k) State Defined.’’
                                                                                           Page 45, line 9, strike ‘‘; or’’ and insert a period.
                                                                                           Page 45, line 16, strike the period at the end and insert
                                                                                       ‘‘; or’’.
                                                                                           Page 45, after line 16, insert the following: ‘‘(3) that are
                                                                                       no longer having project purposes adequately met by the
                                                                                       Corps of Engineers, because of deferment of maintenance
                                                                                       or other challenges, and the divestment of which to a non-
                                                                                       Federal entity could better meet the local and regional
                                                                                       needs for operation and maintenance.
                                                                                           Page 56, line 3, insert ‘‘the coastal and tidal waters of
                                                                                       the State of Louisiana, the waterways of the counties that
                                                                                       comprise the Sacramento-San Joaquin Delta, California,’’
                                                                                       after ‘‘New Jersey,’’.
                                                                                           Page 59, line 4, strike ‘‘Section’’ and insert the following:
                                                                                       (a) In General.—Section Page 59, line 6, strike ‘‘by insert-
                                                                                       ing ‘or contribute’ ’’ and insert ‘‘by inserting ‘, or provide




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                       contributions equal to,’ ’’.
                                                                                           Page 59, after line 14, insert a new subsection entitled
                                                                                       ‘‘(b) Continued Eligibility.’’




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00070   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      71

                                                                                           Page 73, after line 17, insert the following new sections
                                                                                        entitled ‘‘Sec. 139. Cost Sharing Provisions for Territories
                                                                                        and Indian Tribes.’’; and ‘‘Sec. 140. Flood Control and
                                                                                        Other Purposes.’’
                                                                                           Page 76, after line 3, insert a new paragraph entitled
                                                                                        ‘‘(16) Boston, Massachusetts.’’
                                                                                           Page 80, after line 14, insert the following: (7) Project for
                                                                                        flood risk management, Lower Cache Creek, California.
                                                                                           Page 80, after line 17, insert the following: (8) Project for
                                                                                        shoreline protection, Oceanside, California, authorized pur-
                                                                                        suant to section 414 of the Water Resources Development
                                                                                        Act of 2000 (114 Stat. 2636; 121 Stat. 1176).
                                                                                           Page 82, after line 4, insert the following:
                                                                                           (16) Project for flood control, Amite River and Tribu-
                                                                                        taries east of the Mississippi River, Louisiana.
                                                                                           (17) Project for coastal storm risk management, Upper
                                                                                        Barataria Basin, Louisiana.
                                                                                           (18) Project to replace the Bourne and Sagamore
                                                                                        Bridges, Cape Cod, Massachusetts.
                                                                                           Page 82, after line 8, insert the following: (17) Project for
                                                                                        flood risk management, Rahway River Basin, New Jersey.
                                                                                           Page 82, after line 22, insert the following: (21) Project
                                                                                        to resolve increased silting and shoaling adjacent to the
                                                                                        Federal channel, Port of Bandon, Coquille River, Oregon.
                                                                                           Page 84, after line 5, insert the following: (31) Project for
                                                                                        hurricane and storm damage risk reduction and shoreline
                                                                                        erosion protection, Bolongo Bay, St. Thomas, United States
                                                                                        Virgin Islands.
                                                                                           Page 94, after line 25, insert a new section entitled ‘‘Sec.
                                                                                        207. Portsmouth Harbor and Piscataqua River and Rye
                                                                                        Harbor, New Hampshire.’’
                                                                                           Page 96, line 11, strike ‘‘The Secretary’’ and insert the
                                                                                        following: (1) In General. The Secretary
                                                                                           Page 96, after line 18, insert a new paragraph entitled
                                                                                        ‘‘(2) Focus Areas.’’
                                                                                           Page 97, line 20, strike ‘‘paragraph (1)(D)’’ and insert
                                                                                        ‘‘subsection (c)’’.
                                                                                           Page 111, after line 8, insert the following: (5) an assess-
                                                                                        ment of the annual funding level trends for moderate use
                                                                                        harbor projects (as defined in section 210 of the Water Re-
                                                                                        sources Development Act of 1986 on the day before the
                                                                                        date of enactment of this Act) after the date of enactment
                                                                                        of the Water Resources Development Act of 2014 (Public
                                                                                        Law 113–121), excluding funds awarded to donor ports me-
                                                                                        dium-sized donor ports, and energy transfer ports (as such
                                                                                        terms are defined in section 2106 of the Water Resources
                                                                                        Reform and Development Act of 2014 (33 U.S.C. 2201));
                                                                                           Page 116, after line 16, insert new sections entitled ‘‘Sec.
                                                                                        219. Report on Recreational Facilities.’’; ‘‘Sec. 220. GAO
                                                                                        Study on Administration of Environmental Banks.’’; and
                                                                                        ‘‘Sec. 221. Lake Okeechobee Regulation Schedule.’’




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                           Page 144, after line 14, insert a new paragraph entitled
                                                                                        ‘‘(3) Madison And St. Clair Counties, Illinois.’’
                                                                                       An amendment offered by Mr. Weber (#2) was WITHDRAWN.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00071   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      72

                                                                                          At the end of title III of the bill, add a new section enti-
                                                                                       tled ‘‘Sec. ll. Reservoir Management and Operational
                                                                                       Plans for Lower Brazos River Basin.’’
                                                                                     An amendment offered by Mr. Pappas (#3) was WITHDRAWN.
                                                                                          Page 73, after line 17, insert a new section entitled ‘‘Sec.
                                                                                       139. Clean Water Act Effluent Standards, Pretreatment
                                                                                       Standards, and Water Quality Criteria for PFAS.’’
                                                                                     An amendment offered by Mr. Fitzpatrick (#4); was WITH-
                                                                                   DRAWN.
                                                                                          Page 73, after line 17, insert a new section entitled ‘‘Sec.
                                                                                       139. Susquehanna, Delaware, and Potomac River Basin
                                                                                       Commissions.’’
                                                                                     A point of order was reserved against the amendment by Mr.
                                                                                   DeFazio, but subsequently fell when the amendment was with-
                                                                                   drawn.
                                                                                     An amendment offered by Mr. Garamendi (#5) was NOT
                                                                                   AGREED TO by voice vote.
                                                                                          At the end of title I, add a new section entitled ‘‘SEC.
                                                                                       ll. Transfer of Excess Credit.’’
                                                                                     An amendment offered by Mr. Woodall (#6) was WITHDRAWN.
                                                                                          At the end of title I of the bill, add a new section enti-
                                                                                       tled ‘‘Sec. ll. Studies of Constructed Projects.’’
                                                                                     An amendment offered by Mr. Garamendi (#7) was WITH-
                                                                                   DRAWN.
                                                                                          At the end of title I, add a new section entitled ‘‘Sec.
                                                                                       ll. Repeal of Reprogramming Authority.’’
                                                                                     An amendment offered by Mr. Graves of Louisiana (#8) was
                                                                                   WITHDRAWN.
                                                                                          Page 175, after line 19, insert a new section entitled
                                                                                       ‘‘Sec. 331. Morganza to the Gulf of Mexico, Louisiana.’’
                                                                                     An amendment offered by Mr. Garamendi (#9) was WITH-
                                                                                   DRAWN. llAt the end of title I, add a new section entitled ‘‘Sec.
                                                                                   ll. Implementation of Small Business Act.’’
                                                                                     An amendment offered by Mr. Graves of Louisiana (#10) was
                                                                                   WITHDRAWN.
                                                                                          At the end of title III of the bill, add a new section enti-
                                                                                       tled ‘‘Sec. ll. Establishment of National Foundation for
                                                                                       Resilience.’’
                                                                                     An amendment offered by Mr. Garamendi (#11) was WITH-
                                                                                   DRAWN.
                                                                                          Page 184, after line 18, insert a new subsection entitled
                                                                                       ‘‘(d) Yuba River Ecosystem Restoration Project, California.’’
                                                                                     An amendment offered by Mr. Mast (#12) was NOT AGREED TO
                                                                                   by voice vote.
                                                                                          At the end of title III, add a new section entitled ‘‘Sec.
                                                                                       ll. Management of the Central and Southern Florida
                                                                                       System.’’
                                                                                     An amendment offered by Mr. Mast (#13) was WITHDRAWN.
                                                                                          At the end of title III, add a new section entitled ‘‘Sec.
                                                                                       ll. Loxahatchee River Watershed Restoration Project,
                                                                                       Florida.’’
                                                                                     An amendment offered by Mr. Lynch (#14) was WITHDRAWN.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          At the end of title I of the bill, add a new section enti-
                                                                                       tled ‘‘Sec. ll. Deferred Payments.’’
                                                                                     An amendment offered by Mr. Mast (#15) was WITHDRAWN.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00072   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      73

                                                                                           At the end of title I, add a new section entitled ‘‘Sec.
                                                                                        ll. Florida Estuaries.’’
                                                                                     An amendment offered by Ms. Craig (#16) was WITHDRAWN.
                                                                                           Page 175, after line 2, insert a new subsection entitled
                                                                                        ‘‘(k) Upper Mississippi River.’’
                                                                                     An amendment offered by Mr. Graves of Louisiana (#17) was
                                                                                   WITHDRAWN.
                                                                                           Strike section 137 of the bill and insert a new section en-
                                                                                        titled ‘‘Sec. 137. Non-Federal Implementation Program.’’
                                                                                     An amendment offered by Mr. Lynch (#18); was AGREED TO by
                                                                                   voice vote.
                                                                                           At the end of title III, add a new section entitled ‘‘Sec.
                                                                                        ll. Regional Sediment Management.’’
                                                                                     An amendment offered by Ms. Finkenauer (#19) was AGREED
                                                                                   TO by voice vote.
                                                                                           Page 73, after line 17, insert a new section entitled ‘‘Sec.
                                                                                        139. Review of Contracting Policies.’’
                                                                                     An amendment offered by Mr. Perry (#20) was AGREED TO by
                                                                                   unanimous consent.
                                                                                           At the end of title I, add a new section entitled ‘‘Sec.
                                                                                        ll. Buy America.’’
                                                                                     An amendment offered by Mr. Perry (#21) was NOT AGREED
                                                                                   TO by a recorded vote of 2 yeas and 62 nays (Roll Call Vote No.
                                                                                   38).
                                                                                           Strike section 101 and insert a new section 1010 entitled
                                                                                        ‘‘Sec. 101. Budgetary treatment of Harbor Maintenance
                                                                                        Trust Fund.’’
                                                                                     An amendment offered by Mr. Gibbs (#22) was WITHDRAWN.
                                                                                           At the end of title III, add a new section entitled ‘‘Sec.
                                                                                        ll., Great Lakes Confined Disposal Facilities.’’
                                                                                     An amendment offered by Mr. Gibbs (#23) was WITHDRAWN.
                                                                                           Page 73, after line 17, insert a new section entitled ‘‘Sec.
                                                                                        139. National Coastal Mapping Program.’’
                                                                                     An amendment offered by Mr. Bost (#24) was WITHDRAWN.
                                                                                           Page 59, line 7, strike ‘‘and’’ at the end. Page 59, after
                                                                                        line 7, insert the following (and redesignate the subse-
                                                                                        quent paragraph accordingly):
                                                                                           (2) in clause (i) by striking clause (II) and inserting the
                                                                                        following:
                                                                                           ‘‘(II) the Secretary determines that the damage to the
                                                                                        structure was not a result of negligent operation or main-
                                                                                        tenance.’’; and;
                                                                                     An amendment offered by Mr. Woodall (#25) was WITHDRAWN.
                                                                                           At the end of title II add a new section entitled ‘‘Sec.
                                                                                        ll. Savannah River, South Carolina.
                                                                                     An amendment offered by Mr. Graves of Louisiana (#26) was
                                                                                   WITHDRAWN.
                                                                                           At the end of title I of the bill, add a new section enti-
                                                                                        tled ‘‘Sec. ll. Real Property Interests.’’
                                                                                     An amendment offered by Mr. Babin (#27) was AGREED TO by
                                                                                   voice vote.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                           Page 78, strike lines 18 through 24 and insert a new
                                                                                        paragraph entitled ‘‘(32) Sabine Pass to Galveston Bay,
                                                                                        Texas.’’




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00073   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                                    74

                                                                                         Page 79, strike lines 10 through 18 and insert a new
                                                                                      paragraph entitled ‘‘(b) Special Rule.’’
                                                                                    An amendment offered by Mr. Graves of Louisiana (#28) was
                                                                                   AGREED TO by voice vote.
                                                                                         Ad at the end of title III a new section entitled ‘‘Sec.
                                                                                      ll. Calcasieu River and Pass, Louisiana.’’
                                                                                    An amendment offered by Mr. Garcia of California (#29) was
                                                                                   WITHDRAWN.
                                                                                         Add at the end of title I a new section entitled ‘‘Sec.
                                                                                      ll. WIIN Act Amendments.’’
                                                                                    An amendment offered by Mr. Graves of Louisiana (#30) was
                                                                                   AGREED TO by voice vote.
                                                                                         At the end of title I, add a new section entitled ‘‘Sec.
                                                                                      ll. Annual Report on Status of Feasibility Studies.
                                                                                    An amendment offered by Mr. Graves of Louisiana (#31) was
                                                                                   WITHDRAWN.
                                                                                         Page 186, line 12 insert a new paragraph entitled ‘‘(5)
                                                                                      Port Fourchon, Louisiana.’’
                                                                                    An amendment offered by Mr. Graves of Louisiana (#32) was
                                                                                   NOT AGREED TO by voice vote.
                                                                                         Page 175, after line 19, insert a new section entitled
                                                                                      ‘‘Section 332. Morganza to the Gulf of Mexico, Louisiana.’’
                                                                                                                                        COMMITTEE VOTES
                                                                                      Clause 3(b) of rule XIII of the Rules of the House of Representa-
                                                                                   tives requires each committee report to include the total number of
                                                                                   votes cast for and against on each record vote on a motion to report
                                                                                   and on any amendment offered to the measure or matter, and the
                                                                                   names of those members voting for and against.
                                                                                      The Committee on Transportation and Infrastructure considered
                                                                                   H.R. 7575 on July 15, 2020, and took the following votes:
                                                                                      An Amendment offered by Mr. Perry (#21) was Not Agreed to: 2
                                                                                   yeas and 62 nays (Roll Call Vote No. 39). The vote was as follows:
                                                                                                                          ONE HUNDRED SIXTEENTH CONGRESS
                                                                                                                               ROLL CALL VOTE NO. 38
                                                                                   On agreeing to Amendment #21 offered by Mr. Perry
                                                                                   Not Agreed to: 2 yeas and 62 nays.

                                                                                                 Representative                          Yea   Nay                     Representative                          Yea     Nay
                                                                                   Mr. DeFazio, Chair .........................                 X        Mr. Graves of MO, Ranking Mem-                                X
                                                                                                                                                            ber.
                                                                                   Ms. Norton .....................................             X        Mr. Young .....................................
                                                                                   Ms. Johnson of TX .........................                  X        Mr. Crawford ................................                 X
                                                                                   Mr. Larsen of WA ..........................                  X        Mr. Gibbs ......................................              X
                                                                                   Mrs. Napolitano .............................                X        Mr. Webster of FL ........................                    X
                                                                                   Mr. Lipinski ...................................             X        Mr. Massie ....................................        X
                                                                                   Mr. Cohen ......................................             X        Mr. Perry .......................................      X
                                                                                   Mr. Sires ........................................           X        Mr. Davis of IL .............................
                                                                                   Mr. Garamendi ..............................                 X        Mr. Woodall ..................................                X
                                                                                   Mr. Johnson of GA .........................                  X        Mr. Katko ......................................              X
                                                                                   Mr. Carson of IN ...........................                 X        Mr. Babin .....................................               X
                                                                                   Ms. Titus .......................................            X        Mr. Graves of LA ..........................                   X




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Mr. Maloney of NY .........................                  X        Mr. Rouzer ....................................               X
                                                                                   Mr. Huffman ..................................               X        Mr. Bost ........................................             X
                                                                                   Ms. Brownley of CA .......................                   X        Mr. Weber of TX ...........................




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006       PO 00000        Frm 00074        Fmt 6659    Sfmt 6602        E:\HR\OC\HR460P1.XXX                   HR460P1
                                                                                                                                                   75

                                                                                                 Representative                         Yea   Nay                    Representative                          Yea     Nay

                                                                                   Ms. Wilson of FL ...........................                X        Mr. LaMalfa ..................................               X
                                                                                   Mr. Payne ......................................            X        Mr. Westerman .............................                  X
                                                                                   Mr. Lowenthal ................................              X        Mr. Smucker .................................                X
                                                                                   Mr. DeSaulnier ...............................              X        Mr. Mitchell ..................................              X
                                                                                   Ms. Plaskett ..................................             X        Mr. Mast .......................................             X
                                                                                   Mr. Lynch .......................................           X        Mr. Gallagher ...............................                X
                                                                                   Mr. Carbajal ..................................             X        Mr. Palmer ....................................              X
                                                                                   Mr. Brown of MD ...........................                 X        Mr. Fitzpatrick ..............................               X
                                                                                   Mr. Espaillat ..................................            X        Miss González-Colón of PR ..........                       X
                                                                                   Mr. Malinowski ..............................               X        Mr. Balderson ...............................                X
                                                                                   Mr. Stanton ...................................             X        Mr. Spano .....................................              X
                                                                                   Ms. Mucarsel-Powell .....................                   X        Mr. Stauber ..................................               X
                                                                                   Mrs. Fletcher .................................             X        Mrs. Miller ....................................             X
                                                                                   Mr. Allred .......................................          X        Mr. Pence .....................................              X
                                                                                   Ms. Davids of KS ..........................                 X        Mr. Garcia of CA ..........................                  X
                                                                                   Ms. Finkenauer ..............................               X
                                                                                   Mr. Garcı́a of IL .............................             X
                                                                                   Mr. Delgado ...................................             X
                                                                                   Mr. Pappas ....................................             X
                                                                                   Ms. Craig .......................................           X
                                                                                   Mr. Rouda ......................................            X
                                                                                   Mr. Lamb .......................................            X
                                                                                                                                                        Vote Total:                                           2      62

                                                                                                                      COMMITTEE OVERSIGHT FINDINGS
                                                                                     With respect to the requirements of clause 3(c)(1) of rule XIII of
                                                                                   the Rules of the House of Representatives, the Committee’s over-
                                                                                   sight findings and recommendations are reflected in this report.
                                                                                                     NEW BUDGET AUTHORITY AND TAX EXPENDITURES
                                                                                     With respect to the requirements of clause 3(c)(2) of rule XIII of
                                                                                   the Rules of the House of Representatives and section 308(a) of the
                                                                                   Congressional Budget Act of 1974 and with respect to requirements
                                                                                   of clause (3)(c)(3) of rule XIII of the Rules of the House of Rep-
                                                                                   resentatives and section 402 of the Congressional Budget Act of
                                                                                   1974, the Committee has requested but not received a cost estimate
                                                                                   for this bill from the Director of Congressional Budget Office. The
                                                                                   Committee has requested but not received from the Director of the
                                                                                   Congressional Budget Office a statement as to whether this bill
                                                                                   contains any new budget authority, spending authority, credit au-
                                                                                   thority, or an increase or decrease in revenues or tax expenditures.
                                                                                   The Chairman of the Committee shall cause such estimate and
                                                                                   statement to be printed in the Congressional Record upon its re-
                                                                                   ceipt by the Committee.
                                                                                                      CONGRESSIONAL BUDGET OFFICE COST ESTIMATE
                                                                                     With respect to the requirement of clause 3(c)(3) of rule XIII of
                                                                                   the Rules of the House of Representatives, a cost estimate provided
                                                                                   by the Congressional Budget Office pursuant to section 402 of the
                                                                                   Congressional Budget Act of 1974 was not made available to the




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Committee in time for the filing of this report. The Chairman of
                                                                                   the Committee shall cause such estimate to be printed in the Con-
                                                                                   gressional Record upon its receipt by the Committee.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006       PO 00000        Frm 00075       Fmt 6659    Sfmt 6602       E:\HR\OC\HR460P1.XXX                   HR460P1
                                                                                                                                      76

                                                                                                         PERFORMANCE GOALS AND OBJECTIVES
                                                                                      With respect to the requirement of clause 3(c)(4) of rule XIII of
                                                                                   the Rules of the House of Representatives, the performance goal
                                                                                   and objective of this legislation is to provide authorization for
                                                                                   Corps studies and projects within the key missions of the Corps, in-
                                                                                   cluding developing, maintaining, and supporting the Nation’s water
                                                                                   resources development infrastructure for navigation, flood protec-
                                                                                   tion, and environmental restoration needs. Additionally, the legisla-
                                                                                   tion is intended to increase the ability of the Nation’s infrastruc-
                                                                                   ture, waterways, and localities to respond to and recover from ex-
                                                                                   treme weather events and recurring flooding. Finally, H.R. 7575, as
                                                                                   amended, will increase equities and eligibilities in the Corps’ pri-
                                                                                   mary mission areas for economically disadvantaged communities,
                                                                                   rural communities, and tribal or minority communities, for the pur-
                                                                                   poses of equal protection and access, as well as environmental jus-
                                                                                   tice.
                                                                                                          DUPLICATION OF FEDERAL PROGRAMS
                                                                                     Pursuant to clause 3(c)(5) of rule XIII of the Rules of the House
                                                                                   of Representatives, the Committee finds that no provision of H.R.
                                                                                   7575, as amended, establishes or reauthorizes a program of the
                                                                                   Federal government known to be duplicative of another federal pro-
                                                                                   gram, a program that was included in any report from the Govern-
                                                                                   ment Accountability Office to Congress pursuant to section 21 of
                                                                                   Public Law 111–139, or a program related to a program identified
                                                                                   in the most recent Catalog of Federal Domestic Assistance.
                                                                                       CONGRESSIONAL EARMARKS, LIMITED TAX BENEFITS, AND LIMITED
                                                                                                           TARIFF BENEFITS
                                                                                     In compliance with clause 9 of rule XXI of the Rules of the House
                                                                                   of Representatives, this bill, as reported, contains no congressional
                                                                                   earmarks, limited tax benefits, or limited tariff benefits as defined
                                                                                   in clause 9(e), 9(f), or 9(g) of the rule XXI.
                                                                                                               FEDERAL MANDATES STATEMENT
                                                                                     An estimate of Federal mandates prepared by the Director of the
                                                                                   Congressional Budget Office pursuant to section 423 of the Un-
                                                                                   funded Mandates Reform Act was not made available to the Com-
                                                                                   mittee in time for the filing of this report. The Chairman of the
                                                                                   Committee shall cause such estimate to be printed in the Congres-
                                                                                   sional Record upon its receipt by the Committee.
                                                                                                                 PREEMPTION CLARIFICATION
                                                                                      Section 423 of the Congressional Budget Act of 1974 requires the
                                                                                   report of any Committee on a bill or joint resolution to include a
                                                                                   statement on the extent to which the bill or joint resolution is in-
                                                                                   tended to preempt state, local, or tribal law. The Committee finds
                                                                                   that H.R. 7575, as amended, does not preempt any state, local, or




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   tribal law.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00076   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      77

                                                                                                               ADVISORY COMMITTEE STATEMENT
                                                                                     No advisory committees within the meaning of section 5(b) of the
                                                                                   Federal Advisory Committee Act were created by this legislation.
                                                                                                         APPLICABILITY TO LEGISLATIVE BRANCH
                                                                                     The Committee finds that the legislation does not relate to the
                                                                                   terms and conditions of employment or access to public services or
                                                                                   accommodations within the meaning of section 102(b)(3) of the Con-
                                                                                   gressional Accountability Act (Public Law 104–1).
                                                                                               SECTION–BY–SECTION ANALYSIS OF THE LEGISLATION
                                                                                   Section 1. Short title; Table of contents
                                                                                     This section provides that this bill may be cited as the ‘‘Water
                                                                                   Resources Development Act of 2020’’; and includes a table of con-
                                                                                   tents.
                                                                                   Sec. 2. Secretary defined
                                                                                     This section defines the term ‘‘Secretary’’ as the Secretary of the
                                                                                   Army.
                                                                                                                TITLE I—GENERAL PROVISIONS

                                                                                   Sec. 101. Budgetary treatment expansion and adjustment for the
                                                                                        Harbor Maintenance Trust Fund
                                                                                     This section provides authority to appropriate additional funds
                                                                                   for harbor maintenance needs from the existing balance in the Har-
                                                                                   bor Maintenance Trust Fund (HMTF). The current estimate of the
                                                                                   balance in the trust fund is approximately $10 billion.
                                                                                   Sec. 102. Funding for navigation
                                                                                     This section establishes a new framework for annual allocation
                                                                                   of operation and maintenance expenditures from the HMTF. This
                                                                                   section establishes new targets for emerging harbors, donor ports,
                                                                                   and Great Lakes Harbors. This section also allows for additional
                                                                                   expanded uses for emerging harbors and donor ports.
                                                                                   Sec. 103. Annual report to Congress on the Harbor Maintenance
                                                                                        Trust Fund
                                                                                     This section ensures that the annual report to Congress on the
                                                                                   HMTF is submitted concurrently with the President’s annual budg-
                                                                                   et request to Congress.
                                                                                   Sec. 104. Additional measures at donor ports and energy transfer
                                                                                       ports
                                                                                     This section reauthorizes discretionary appropriations to provide
                                                                                   payments to donor ports, medium-sized donor ports, and energy
                                                                                   transfer ports. This authority is extended through fiscal year 2030.
                                                                                   This section also allows for a rolling eligibility for donor ports, me-
                                                                                   dium-sized donor ports, and energy transfer ports based on prior
                                                                                   three years of cargo shipments.
                                                                                   Sec. 105. Assumption of maintenance of a locally preferred plan




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     This section authorizes the Corps to assume operation and main-
                                                                                   tenance responsibilities for navigation projects carried out by non-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00077   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      78

                                                                                   Federal interests where project improvements deviate from the na-
                                                                                   tional economic development plan.
                                                                                   Sec. 106. Coast Guard anchorages
                                                                                     This section provides the Corps with the authority to maintain
                                                                                   U.S. Coast Guard designated anchorages on the Columbia River.
                                                                                   Sec. 107. State contribution of funds for certain operation and
                                                                                        maintenance costs
                                                                                     This section provides the Corps with the authority to accept and
                                                                                   expend funds from a state within the Great Lakes Navigation Sys-
                                                                                   tem to cover the additional costs for operations and maintenance
                                                                                   activities as a result of a state’s implementation of any additional
                                                                                   limitation on the disposal of dredged material in the state’s open
                                                                                   waters.
                                                                                   Sec. 108. Inland waterways projects
                                                                                     This section authorizes a modification to the cost share of con-
                                                                                   struction or major rehabilitation of any inland waterways project to
                                                                                   65 percent from the general fund of the Treasury and 35 percent
                                                                                   from the Inland Waterways Trust Fund through fiscal year 2027.
                                                                                   Inland waterways projects that receive construction appropriations
                                                                                   during this time carry the modified cost share through project com-
                                                                                   pletion. This section also directs the Secretary to prioritize inland
                                                                                   waterways projects included in the most recent Inland and Inter-
                                                                                   coastal Twenty-Year Capital Investment Strategy.
                                                                                   Sec. 109. Implementation of water resources principles and require-
                                                                                        ments
                                                                                      This section directs the Corps to issue final agency procedures for
                                                                                   the Principles, Requirements and Guidelines (PR&G), pursuant to
                                                                                   section 2031 of the Water Resources Development Act of 2007. The
                                                                                   PR&G serves as the basis for the Corps’ evaluation of project bene-
                                                                                   fits and costs. The Corps is required to solicit, engage, and consider
                                                                                   public and expert comment prior to release of the PR&G, review
                                                                                   the PR&Gs every five years, and inform stakeholders prior to any
                                                                                   revisions for input and guidance.
                                                                                   Sec. 110. Resiliency planning assistance
                                                                                     This section amends the Corps’ Floodplain Management Service
                                                                                   program to allow the Corps to provide technical assistance to non-
                                                                                   Federal interests and other Federal agencies for greater resiliency
                                                                                   planning. Additionally, this section directs the Corps to prioritize
                                                                                   technical assistance to economically disadvantaged communities.
                                                                                   Sec. 111. Project consultation
                                                                                     This section requires the Corps to complete previously authorized
                                                                                   reports on community and tribal consultation, as well as update
                                                                                   Corps policies on environmental justice considerations and commu-
                                                                                   nity engagement and consultation. It also expands the Corps’ con-
                                                                                   sultation requirements with Tribal or indigenous groups when




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   working on or adjacent to Tribal lands and areas.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00078   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      79

                                                                                   Sec. 112. Review of resiliency assessments
                                                                                      This section requires the Corps to update existing planning guid-
                                                                                   ance related to sea level rise based on the best available, peer-re-
                                                                                   viewed science, in coordination with Federal and state agencies.
                                                                                   This section also reiterates the Corps’ discretion to consider bene-
                                                                                   fits accrued over time as a result of sea level rise, and when re-
                                                                                   quested by the non-Federal interest, requires the Secretary to con-
                                                                                   sider whether the need for the project is predicated upon or exacer-
                                                                                   bated by conditions related to sea level rise.
                                                                                   Sec. 113. Small flood control projects
                                                                                     This section allows for natural or nature-based infrastructure
                                                                                   projects to be considered as part of the Section 205 continuing au-
                                                                                   thorities program for small flood risk management projects.
                                                                                   Sec. 114. Conforming amendment
                                                                                      This section clarifies the cost share for natural and nature-based
                                                                                   infrastructure is 65 percent Federal and 35 percent non-Federal, in
                                                                                   line with the established cost share for non-structural project alter-
                                                                                   natives.
                                                                                   Sec. 115. Feasibility studies; Review of natural and nature-based
                                                                                       features
                                                                                     This section directs the Corps to include in each flood reduction
                                                                                   and hurricane and storm damage reduction project feasibility study
                                                                                   a summary of any nature-based features that were considered. The
                                                                                   Corps is directed to provide an explanation if nature-based features
                                                                                   are not recommended.
                                                                                   Sec. 116. Report on corrosion prevention activities
                                                                                     This section directs the Corps to report to Congress on corrosion
                                                                                   prevention activities at Corps projects.
                                                                                   Sec. 117. Quantification of benefits for flood risk management
                                                                                        projects in seismic zones
                                                                                      This section requires the Corps to quantify the seismic hazard
                                                                                   risk reduction benefits for flood risk management projects, when
                                                                                   requested by the non-Federal sponsor.
                                                                                   Sec. 118. Federal interest determination
                                                                                     This section directs the Corps to complete a Federal interest de-
                                                                                   termination for feasibility studies with economically disadvantaged
                                                                                   communities, if requested by the non-Federal interest. Additionally,
                                                                                   the Corps is directed to assist non-Federal interests in economically
                                                                                   disadvantaged communities on how to rescope project requests to
                                                                                   ensure that the project is economically justified.
                                                                                   Sec. 119. Economically disadvantaged community flood protection
                                                                                        and hurricane and storm damage reduction study pilot pro-
                                                                                        gram
                                                                                      This section directs the Corps to establish a pilot program to




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   evaluate opportunities to address the flood risk reduction and hur-
                                                                                   ricane and storm damage reduction needs for economically dis-
                                                                                   advantaged communities. The Corps is directed to select 10 studies




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00079   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      80

                                                                                   to be carried out at Federal expense, and the pilot program sunsets
                                                                                   10 years after enactment.
                                                                                   Sec. 120. Permanent measures to reduce emergency flood fighting
                                                                                        needs for communities subject to repetitive flooding
                                                                                      This section provides new authority to study, design, and con-
                                                                                   struct water resources projects for communities that have experi-
                                                                                   enced repetitive flooding events and have received emergency flood
                                                                                   fighting assistance under the Corps’ P.L. 84–99 program. The max-
                                                                                   imum Federal share for a project is $15 million and the Corps shall
                                                                                   consider a community’s ability to pay.
                                                                                   Sec. 121. Emergency response to natural disasters
                                                                                      This section provides non-Federal interests with an opportunity
                                                                                   to recommend proposals to the Corps to increase the level of protec-
                                                                                   tion for projects that have received assistance through the P.L. 84–
                                                                                   99 program. Additionally, this section allows inactive non-Federal
                                                                                   interests in the P.L. 84–99 program to be eligible for assistance if
                                                                                   the non-Federal interest agrees to pay, during performance of the
                                                                                   repair or restoration work, all costs to address items of deferred or
                                                                                   inadequate maintenance and all repair or restoration work nec-
                                                                                   essary to address damage attributable to such deficiencies. An inac-
                                                                                   tive non-Federal interest is only eligible to use this authority once,
                                                                                   and this authority sunsets in five years.
                                                                                   Sec. 122. Study of natural infrastructure at Corps of Engineers
                                                                                        projects
                                                                                     This section directs the Comptroller General of the United States
                                                                                   to report to Congress on the Corps’ consideration of natural and na-
                                                                                   ture-based features during project planning.
                                                                                   Sec. 123. Review of Corps of Engineers assets
                                                                                      This section directs the Corps to develop an inventory of projects
                                                                                   which are no longer needed to complete the missions of the Corps.
                                                                                   Additionally, the Corps is directed to identify projects that could
                                                                                   benefit from the addition of nature-based features or other modi-
                                                                                   fications.
                                                                                   Sec. 124. Sense of Congress on multi-purpose projects
                                                                                      This section provides a Sense of Congress that the Corps should
                                                                                   maximize the consideration and evaluation of projects with mul-
                                                                                   tiple benefits.
                                                                                   Sec. 125. Beneficial reuse of dredged material; Dredged material
                                                                                        management plans
                                                                                     This section renews the Congressional commitment to beneficial
                                                                                   reuse of dredged material obtained from Corps projects and in-
                                                                                   creases the authorized number of demonstration projects to 30
                                                                                   projects. Additionally, this section expands the Corps’ consider-
                                                                                   ations when evaluating the placement of dredged materials and
                                                                                   when calculating the economic benefits of dredged material. This




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   section also ensures that the Corps considers small, rural, and eco-
                                                                                   nomically disadvantaged communities when selecting its additional
                                                                                   projects. Lastly, this section increases the coordination of beneficial




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00080   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      81

                                                                                   reuse projects by directing the Corps to develop five-year regional
                                                                                   dredged material management plans.
                                                                                      In directing the Corps to maximize the beneficial use of suitable
                                                                                   dredged materials, the Committee does not intend for the Corps to
                                                                                   only consider beneficial reuse efforts within the context of the bene-
                                                                                   ficial reuse pilot projects authorized by section 1122 of the Water
                                                                                   Resources Development Act of 2016, but to explore opportunities
                                                                                   for the beneficial reuse of suitable materials wherever they may
                                                                                   present themselves. This section provides for enhanced directives to
                                                                                   the Secretary to leverage the value of dredged material in the
                                                                                   course of carrying out maintenance projects. The Committee fur-
                                                                                   ther encourages the Secretary to consider the use of alternative
                                                                                   dredging techniques and equipment that will assure compliance
                                                                                   with new and existing five-year strategic management plans, be en-
                                                                                   vironmentally protective, promote economic activities, and enable
                                                                                   increased beneficial use of dredged material. The Committee is
                                                                                   aware of efforts related to the dredging of the Richmond Outer
                                                                                   Harbor and Pinole Shoal, California, that, the Committee believes,
                                                                                   would be a promising location for employing such activities.
                                                                                      The Committee is also aware that the Corps has selected only 10
                                                                                   of the authorized pilot projects under section 1122 of the Water Re-
                                                                                   sources Development Act of 2016 to carry out beneficial use of
                                                                                   dredged sediment, including the selection of the San Francisco Bay
                                                                                   Pilot Project and development of the project management plan with
                                                                                   the California State Coastal Conservancy. The Committee encour-
                                                                                   ages the Corps to budget for the remaining beneficial reuse pilot
                                                                                   projects authorized by the Water Resources Development Act of
                                                                                   2016 and this Act. The Committee is aware of several potential fu-
                                                                                   ture beneficial reuse projects, including opportunities for beneficial
                                                                                   use of dredged material from the San Joaquin River and the Port
                                                                                   of Stockton for the Delta Islands and Levees Project, as authorized
                                                                                   by Congress.
                                                                                      Subsection (d) of this section amends section 1111 of the Water
                                                                                   Resources Development Act of 2018 related to a dredged material
                                                                                   pilot project. This authority was enacted to promote cost-effective
                                                                                   mobilization of Corps dredging assets by allowing the Corps to
                                                                                   work with non-Federal interests in identifying multiple projects in
                                                                                   a geographic region that might be carried out under a single set
                                                                                   of contracts. The Committee is aware that dredging costs can be
                                                                                   the primary cost associated with shoreline protection projects. As
                                                                                   there is so much demand for dredging across the country, mobi-
                                                                                   lizing dredging equipment to a region can be a significant cost be-
                                                                                   fore the actual dredging begins, and section 1111 of WRDA 2018
                                                                                   was enacted to help address this cost. The Committee is aware of
                                                                                   two hurricane and storm damage risk reduction and shoreline pro-
                                                                                   tection projects (the San Clemente Project and the Encinitas-
                                                                                   Solana Beach Project, California) that will potentially be in the
                                                                                   construction phase simultaneously, and encourages the Corps to
                                                                                   consider utilization of the section 1111 authority to allow for co-
                                                                                   ordinated dredging of these projects to potentially reduce overall
                                                                                   project costs. The Committee continues to encourage the Corps to
                                                                                   find opportunities to coordinate planning for the deployment of




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Federal and non-Federal dredges. In sequencing dredging work to
                                                                                   benefit multiple mission sets and providing consistent navigational
                                                                                   certainty, especially in areas of high maritime traffic in our na-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00081   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      82

                                                                                   tion’s harbors and waterways, the Corps will benefit the American
                                                                                   economy and restoration efforts alike. The Committee appreciates
                                                                                   the creation of the Gulf Coast Regional Dredge Demonstration Pro-
                                                                                   gram in P.L. 116–94 and requests that the Corps carry out these
                                                                                   programs in conjunction with one another.
                                                                                   Sec. 126. Aquatic ecosystem restoration for anadromous fish
                                                                                     This section amends the section 206 continuing authorities pro-
                                                                                   gram for aquatic ecosystem restoration to include projects that
                                                                                   maximize benefits for anadromous fish. This section directs the
                                                                                   Corps to give projects for anadromous fish habitat and passage
                                                                                   equal priority for implementation as other projects pursued under
                                                                                   section 206.
                                                                                   Sec. 127. Annual Report to Congress
                                                                                     This section requires that the Corps include in the main table of
                                                                                   the Section 7001 Annual Report to Congress on Future Water Re-
                                                                                   sources Development Projects proposed projects for municipal and
                                                                                   agricultural water use.
                                                                                   Sec. 128. Harmful algal bloom demonstration program
                                                                                     This section directs the Corps to carry out a demonstration pro-
                                                                                   gram for detecting, treating, preventing, and eliminating harmful
                                                                                   algal blooms. Additionally, this section directs the Corps to consult
                                                                                   with Federal and state agencies and to maximize the use of exist-
                                                                                   ing data and programs.
                                                                                   Sec. 129. Update on Invasive Species Policy Guidance
                                                                                     This section requires the Corps to update the Invasive Species
                                                                                   Policy Guidance based on the most recent National Invasive Spe-
                                                                                   cies Council Management Plan. The Corps may also include
                                                                                   invasive species management efforts for Corps projects in Alpine
                                                                                   Lakes and the Tennessee and Cumberland River Basins in its up-
                                                                                   dated guidance.
                                                                                   Sec. 130. Report on debris removal
                                                                                      This section directs the Corps to report to Congress on activities
                                                                                   related to debris removal in the prior 10 fiscal years, and the ex-
                                                                                   tent to which the Corps plans to start potential debris removal ac-
                                                                                   tivities in the future.
                                                                                   Sec. 131. Missouri River interception-rearing complex construction
                                                                                      This section prohibits the Corps from constructing any additional
                                                                                   interception-rearing complexes on the Missouri River until the
                                                                                   Corps reports on their effects, conducts further research through
                                                                                   the Engineer Research and Development Center, and develops a
                                                                                   plan to repair certain structures affected by erosion. The Corps is
                                                                                   directed to solicit public comments prior to constructing any addi-
                                                                                   tional interception-rearing complexes.
                                                                                   Sec. 132. Cost and benefit feasibility assessment




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     This section clarifies that a non-Federal sponsor may contribute
                                                                                   work to an amount sufficient to make the costs equal to the esti-
                                                                                   mated benefits of repair work done in the P.L. 84–99 program.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00082   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      83

                                                                                     The Committee enacted targeted changes to the P.L. 84–99 au-
                                                                                   thority in section 1161 of the Water Resources Development Act of
                                                                                   2018 to allow non-Federal interests the ability to make up the dif-
                                                                                   ferential in cost-benefit analyses for flood control project repairs.
                                                                                   However, the Committee is aware that other potential benefits of
                                                                                   proposed repair projects can also benefit the cost-benefit analyses.
                                                                                   The Corps has confirmed to the Committee that other benefits,
                                                                                   such as navigation benefits, may already be considered in the eco-
                                                                                   nomic analysis for a repair project under P.L. 84–99 (codified at 33
                                                                                   U.S.C. 701n) to the extent such benefits are incidental to flood risk
                                                                                   management benefits. The Committee encourages the Corps to
                                                                                   work with non-Federal interest, using existing authorities and the
                                                                                   authorities provided by the Water Resources Development Act of
                                                                                   2020, in seeking to justify critical flood control project repairs.
                                                                                   Sec. 133. Materials, services, and funds for repair, restoration, or
                                                                                         rehabilitation of projects
                                                                                     This section allows the Corps to reimburse a non-Federal interest
                                                                                   or private party for contributed materials, funds, or services in the
                                                                                   case of emergency or major disaster declarations, if the Corps de-
                                                                                   termines that reimbursement is in the public interest. Any work
                                                                                   contributed under this section must comply with all applicable
                                                                                   Corps laws and regulations regarding acquired materials and serv-
                                                                                   ices.
                                                                                   Sec. 134. Levee safety
                                                                                     This section directs the Corps to identify specific engineering and
                                                                                   maintenance deficiencies for certain levees within the National
                                                                                   Levee Database.
                                                                                   Sec. 135. National dam safety program
                                                                                     This section makes changes to FEMA’s High Hazard Potential
                                                                                   Dam Rehabilitation Program, including making eligible for the pro-
                                                                                   gram hydropower dams that generate less than 1.5 megawatts.
                                                                                   Sec. 136. Rehabilitation of Corps of Engineers constructed pump
                                                                                        stations
                                                                                      This section allows the Corps to make repairs and improvements
                                                                                   to Corps-constructed pump stations with identified major defi-
                                                                                   ciencies and the failure of which would impair the function of flood
                                                                                   risk management projects. This section also requires the Corps to
                                                                                   undertake an inventory of Federally constructed pump stations.
                                                                                   Sec. 137. Non-Federal Project Implementation Pilot Program
                                                                                     This section extends the Non-Federal Project Implementation
                                                                                   Pilot Program until 2026. The Secretary is required to issue imple-
                                                                                   mentation guidance 120 days after enactment of this Act.
                                                                                   Sec. 138. Definition of economically disadvantaged community
                                                                                     This section provides a definition of economically disadvantaged
                                                                                   community for purposes of this Act.




rfrederick on DSKBCBPHB2PROD with HEARING



                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00083   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      84

                                                                                   Sec. 139. Cost sharing provisions for territories and indian tribes
                                                                                     This section amends section 1156 of the Water Resources Devel-
                                                                                   opment Act of 1986 to permanently adjust the current cost share
                                                                                   threshold for inflation.
                                                                                   Sec. 140. Flood control and other purposes
                                                                                     This section authorizes the Secretary and the non-Federal inter-
                                                                                   est to enter into negotiations related to the terms of eligible de-
                                                                                   ferred payment agreements.
                                                                                     The Committee acknowledges the deferred interest obligations of
                                                                                   the State of Louisiana from the construction of the Hurricane Pro-
                                                                                   tection System in the wake of Hurricane Katrina. This section pro-
                                                                                   vides authority for the Corps and the State to seek to renegotiate
                                                                                   the terms and conditions of deferred payment agreements made
                                                                                   with the Secretary under Section 103(k) of WRDA 1986. The Com-
                                                                                   mittee is aware of the State’s desire to renegotiate the terms of the
                                                                                   West Bank and Vicinity, Lake Pontchartrain and Vicinity, and
                                                                                   Southeast Louisiana Urban Flood Damage Reduction Projects. The
                                                                                   Committee encourages the Corps to work with the State in the im-
                                                                                   plementation of this section, which the State argues will allow the
                                                                                   State to continue make new investments to support resiliency in
                                                                                   both the State’s water resources related infrastructure and eco-
                                                                                   system restoration projects.
                                                                                   Sec. 141. Review of contracting policies
                                                                                      This section directs the Secretary to review the policies, guide-
                                                                                   lines, and regulations of the Corps for the development of contrac-
                                                                                   tual agreements between the Secretary and non-Federal interests
                                                                                   and utilities associated with the construction of water resources de-
                                                                                   velopment projects, and to provide a best practices guide to non-
                                                                                   Federal interests prior to the development of future contractual
                                                                                   agreements.
                                                                                   Sec. 142. Buy America
                                                                                      This section requires that all Corps construction and rehabilita-
                                                                                   tion contracts awarded after the date of enactment of this section
                                                                                   ensure that the steel components furnished and delivered under
                                                                                   such contracts be manufactured or fabricated in whole or substan-
                                                                                   tial part in the United States.
                                                                                   Sec. 143. Annual report on status of feasibility studies
                                                                                      This section requires the Secretary to provide an accounting of
                                                                                   all outstanding Corps feasibility studies being conducted by the
                                                                                   Secretary concurrent with the annual report to Congress under sec-
                                                                                   tion 7001 of the WRRDA 14.
                                                                                                               TITLE II—STUDIES AND REPORTS

                                                                                   Sec. 201. Authorization of proposed feasibility studies
                                                                                     This section authorizes the Corps to conduct feasibility studies
                                                                                   for 35 projects for water resources development and conservation
                                                                                   and other purposes. These feasibility studies were submitted in a




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Report to Congress on Future Water Resources Development pur-
                                                                                   suant to Section 7001 of the WRRDA 14 or were otherwise re-
                                                                                   viewed by Congress.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00084   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      85

                                                                                   Sec. 202. Expedited completions
                                                                                      This section directs the Corps to expedite the completion of 33
                                                                                   feasibility studies currently underway. Upon completion of the
                                                                                   study, if the Corps determines that the project is justified, the
                                                                                   Corps may proceed directly to preconstruction planning, engineer-
                                                                                   ing, and design. This section also directs the Corps to expedite the
                                                                                   completion of the following reviews currently underway: post-au-
                                                                                   thorization change reports for five projects, watershed assessments
                                                                                   for two projects, and a disposition study for one project.
                                                                                      Section 202(a) directs the Corps to expedite the completion of the
                                                                                   study for the project for flood risk management, Lower Santa Cruz.
                                                                                   In completing this study, the Corps is directed to consult with, and
                                                                                   seek to address, any concerns of local communities and tribes in
                                                                                   the vicinity of the project.
                                                                                      Section 202(a) also directs the Corps to expedite the completion
                                                                                   of the study for flood risk management, Rahway River Basin, New
                                                                                   Jersey. The Committee is aware that the North Atlantic Division
                                                                                   of the Corps has suggested that further study of this project is not
                                                                                   warranted—a position which is not shared by the non-Federal in-
                                                                                   terest for this project nor the communities this project was author-
                                                                                   ized to protect. The Corps is directed to continue to work with the
                                                                                   non-Federal interest and the surrounding communities in the for-
                                                                                   mulation of an acceptable alternative to the project that would be
                                                                                   in the Federal interest. The Secretary is directed to utilize the au-
                                                                                   thorities included in this Act and the Corps’ own discretion to de-
                                                                                   velop this alternative, as expeditiously as possible, and expects the
                                                                                   Corps to provide the Committee with regular updates on its
                                                                                   progress.
                                                                                      The past three Water Resources Development Acts, in 2014,
                                                                                   2016, and 2018, included provisions similar to section 202 to en-
                                                                                   courage the Corps to expedite completion of ongoing studies related
                                                                                   to water resources development projects. Several of the studies
                                                                                   highlighted in those earlier Acts have resulted in completed Chief’s
                                                                                   Reports and other decision documents that have subsequently been
                                                                                   acted on by Congress, including several Chief’s Reports included in
                                                                                   the Water Resources Development Act of 2020. However, other ex-
                                                                                   pedited studies remain incomplete, including the projects for flood
                                                                                   risk management, for East Hartford and Hartford, Connecticut,
                                                                                   listed in section 1203(a) of the Water Resources Development Act
                                                                                   of 2016.19 The Committee expects the Corps to expedite the com-
                                                                                   pletion of all feasibility studies specifically identified by Congress,
                                                                                   as quickly as possible, and, in accordance with such authorities, if
                                                                                   the Secretary determines that the project is justified in the com-
                                                                                   pleted report, to proceed directly to preconstruction planning, engi-
                                                                                   neering, and design of the project.
                                                                                   Sec. 203. Feasibility study modifications
                                                                                     This section directs the Corps to make modifications to the scope
                                                                                   or process of four feasibility studies currently underway.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     19 See Paragraphs 1203(a)(11) and (12) of the Water Resources Development Act of 2018 (132

                                                                                   Stat. 3803).




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00085   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      86

                                                                                   Sec. 204. Selma, Alabama
                                                                                      This section directs the Corps provide an update on the study for
                                                                                   flood risk management and bank stabilization for Selma, Alabama,
                                                                                   including efforts to assure the preservation of cultural and historic
                                                                                   values associated with national historic landmarks within the
                                                                                   study area.
                                                                                   Sec. 205. Comprehensive Study of the Sacramento River, Yolo By-
                                                                                        pass, California
                                                                                     This section directs the Corps to conduct a comprehensive study
                                                                                   of the Sacramento River in the vicinity of the Yolo Bypass System,
                                                                                   California, and make recommendations for potential water re-
                                                                                   sources development projects, modifications of existing water re-
                                                                                   sources development projects, or other measures to respond to
                                                                                   changing hydrologic and climatic conditions in the region.
                                                                                   Sec. 206. Lake Okeechobee regulation schedule, Florida
                                                                                     This section includes direction to the Corps on efforts to manage
                                                                                   water within Lake Okeechobee, Florida.
                                                                                   Sec. 207. Great Lakes coastal resiliency study
                                                                                      This section directs the Corps to expand its comprehensive as-
                                                                                   sessment of water resources needs for the Great Lakes System, and
                                                                                   make recommendations for potential water resources development
                                                                                   projects, modifications of existing water resources development
                                                                                   projects, or other measures to respond to changing hydrologic and
                                                                                   climatic conditions in the region.
                                                                                   Sec. 208. Rathbun Lake, Chariton River, Iowa
                                                                                     This section directs the Corps to submit a report to Congress
                                                                                   that evaluates the existing water storage allocations at Rathbun
                                                                                   Lake and analyze the affordability and costs of future municipal
                                                                                   water supply allocations to users of the system.
                                                                                   Sec. 209. Report on the status of restoration in the Louisiana Coast-
                                                                                        al area
                                                                                      This section directs the Coastal Louisiana Ecosystem Protection
                                                                                   and Restoration Task Force to submit a report to Congress that in-
                                                                                   cludes policies, strategies, plans, programs, projects, and activities
                                                                                   undertaken for addressing conservation, protection, restoration,
                                                                                   and maintenance of the coastal Louisiana ecosystem, as well as the
                                                                                   financial participation by each agency represented on the Task
                                                                                   Force.
                                                                                   Sec. 210. Lower Mississippi River comprehensive study
                                                                                      This section directs the Corps to submit a report to Congress
                                                                                   that includes the results of a comprehensive study of the Lower
                                                                                   Mississippi Basin and identifies actions the Corps can take for the
                                                                                   comprehensive management of the Basin for the purposes of flood
                                                                                   risk management, navigation, ecosystem restoration, water supply,
                                                                                   hydropower, and recreation.
                                                                                   Sec. 211. Upper Mississippi River comprehensive plan




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     This section directs the Corps to conduct an assessment of the
                                                                                   water resources needs of the Upper Mississippi River Basin.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00086   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      87

                                                                                   Sec. 212. Lower Missouri Basin flood risk and resiliency study,
                                                                                        Iowa, Kansas, Nebraska, and Missouri
                                                                                      This section directs the Corps to expand the scope of the Lower
                                                                                   Missouri Basin study, or otherwise carry out additional studies to
                                                                                   identify site specific flood risk reduction solutions. The section also
                                                                                   requires additional consultation measures for any recommended ac-
                                                                                   tions and specifies that the study is not subject to the traditional
                                                                                   Corps cost and duration limitations.
                                                                                   Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Har-
                                                                                       bor, New Hampshire
                                                                                     This section directs the Secretary to issue a written status up-
                                                                                   date to Congress on two authorized Federal navigation projects: the
                                                                                   project for navigation, Rye Harbor, New Hampshire, and the
                                                                                   project for navigation, Portsmouth Harbor and Piscataqua River,
                                                                                   New Hampshire.
                                                                                   Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Or-
                                                                                        egon
                                                                                     This section directs the Corps to submit a report to Congress on
                                                                                   the initial analysis of deauthorizing hydropower as an authorized
                                                                                   project purpose at Cougar and Detroit Dams. For the purposes of
                                                                                   this section, the Detroit Dam project includes all facilities that op-
                                                                                   erate in conjunction with the main Detroit Dam facility, including
                                                                                   the Big Cliff re-regulating dam. In addition, both the Detroit Dam
                                                                                   project and the Cougar Dam project include all related fish man-
                                                                                   agement facilities.
                                                                                   Sec. 215. Port Orford, Oregon
                                                                                     This section directs the Corps to submit a report to Congress re-
                                                                                   garding the configuration of a breakwater for the navigation project
                                                                                   in Port Orford, Oregon in order to address shoaling issues.
                                                                                   Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas
                                                                                     This section directs the Corps to provide Congress with a status
                                                                                   update on efforts to address flooding along Wilson Creek and Sloan
                                                                                   Creek in the City of Fairview, Texas.
                                                                                   Sec. 217. GAO study on mitigation for water resources development
                                                                                        projects
                                                                                      This section directs the Comptroller General to conduct a study
                                                                                   on the mitigation of fish, wildlife, and environmental impacts re-
                                                                                   sulting from the construction of water resources projects. This sec-
                                                                                   tion further directs the Comptroller General to review the long-
                                                                                   term effectiveness of the various types of mitigation; assess the
                                                                                   backlog of mitigation projects; review how mitigation requirements
                                                                                   might contribute to the resilience of water resources; assess compli-
                                                                                   ance with mitigation requirements and mitigation plans; and pro-
                                                                                   vide recommendations to ensure compliance with and successful
                                                                                   implementation of mitigation requirements for water resources de-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   velopment projects.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00087   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                       88

                                                                                   Sec. 218. GAO study on application of harbor maintenance trust
                                                                                       fund expenditures
                                                                                     This section directs the Comptroller General to conduct a study
                                                                                   on the operation and maintenance needs of Federally authorized
                                                                                   harbor and inland harbor projects, including the primary uses of
                                                                                   such harbor projects, and annual or deferred operation and mainte-
                                                                                   nance needs.
                                                                                   Sec. 219. GAO study on administration of environmental banks
                                                                                     This section directs the Comptroller General to conduct a study
                                                                                   on the administration of section 309 of the Coastal Wetlands Plan-
                                                                                   ning, Protection and Restoration Act to establish an environmental
                                                                                   bank, as authorized by section 5014 of Pub. L. 114–322.
                                                                                     The Committee recognizes the extraordinary coastal wetlands
                                                                                   loss in south Louisiana and the impact this has on the resiliency
                                                                                   of communities and the ecosystem in this region. WRDA2016 au-
                                                                                   thorized the establishment of Environmental Banks in the coastal
                                                                                   zone of Louisiana for the purpose of demonstrating an alternative,
                                                                                   but complementary method of restoration that advances the goals
                                                                                   of authorized ecosystem restoration projects. The intent of the dem-
                                                                                   onstration is to develop a model whereby environmental mitigation
                                                                                   or remediation efforts can be aggregated to advance a greater envi-
                                                                                   ronmental outcome.
                                                                                   Sec. 220. Study on water supply and water conservation at water
                                                                                       resources development projects
                                                                                     This section directs the Corps to submit a report to Congress
                                                                                   that analyzes the benefits and consequences of including municipal
                                                                                   water supply and water conservation as a primary mission of the
                                                                                   Corps when carrying out water resources development projects.
                                                                                   Within the report, the Corps is directed to include an analysis of
                                                                                   how adding municipal water supply and water conservation as a
                                                                                   primary mission may impact the ability of the Corps to carry out
                                                                                   future water resources development projects, and recommendations
                                                                                   related to their inclusion as a primary mission of the Corps.
                                                                                   Sec. 221. PFAS review and inventory at Corps facilities
                                                                                     This section directs the Corps to complete an inventory of Civil
                                                                                   Works facilities that are contaminated or could become contami-
                                                                                   nated by a perfluoroalkyl or polyfluoroalkyl substance (PFAS) and
                                                                                   submit a report on the results to Congress.
                                                                                   Sec. 222. Report on recreational facilities
                                                                                     This section directs the Corps to prepare and submit to the Com-
                                                                                   mittees an inventory and report on the recreational facilities and
                                                                                   infrastructure associated with water resources development
                                                                                   projects, including an assessment of, and the consequence of, any
                                                                                   deferred maintenance of such facilities and infrastructure.
                                                                                                    TITLE III—DEAUTHORIZATIONS AND MODIFICATIONS

                                                                                   Sec. 301. Deauthorization of inactive projects




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                     This section establishes a process that will lead to the deauthor-
                                                                                   ization of at least $10 billion of old, inactive projects, which is the
                                                                                   value of projects authorized in this Act.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006    PO 00000   Frm 00088   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      89

                                                                                   Sec. 302. Abandoned and Inactive Noncoal Mine Restoration
                                                                                     This section increases the authorization amounts for the Aban-
                                                                                   doned and Inactive Noncoal Mine Restoration program.
                                                                                   Sec. 303. Tribal Partnership Program
                                                                                     This section increases the per-project authorization level for the
                                                                                   Tribal Partnership Program.
                                                                                   Sec. 304. Lakes Program
                                                                                     This section provides additional eligibility for the Corps’ Lakes
                                                                                   Program.
                                                                                   Sec. 305. Watercraft inspection stations
                                                                                      This section directs the Corps to establish a watercraft inspection
                                                                                   station for the Russian River Basin and makes a technical correc-
                                                                                   tion to WRDA 2018.
                                                                                   Sec. 306. Chesapeake Bay Environmental Restoration and Protec-
                                                                                       tion Program
                                                                                     This section increases the authorization amounts for the Chesa-
                                                                                   peake Bay Environmental Restoration and Protection Program.
                                                                                   This section also directs the Corps to increase outreach and en-
                                                                                   gagement with non-Federal sponsors on projects within the pro-
                                                                                   gram.
                                                                                   Sec. 307. Upper Mississippi River System Environmental Manage-
                                                                                       ment Program
                                                                                     This section increases the authorization amounts for the Upper
                                                                                   Mississippi River System Environmental Management Program.
                                                                                   Sec. 308. McClellan-Kerr Arkansas River Navigation System
                                                                                     This section clarifies that any Federal funds used to carry out
                                                                                   construction of McClellan-Kerr Arkansas River Navigation System
                                                                                   are considered as initiating construction of the project.
                                                                                   Sec. 309. Ouachita-Black River Navigation Project, Arkansas
                                                                                     This section authorizes water supply as a project purpose for the
                                                                                   Ouachita-Black project after the Corps completes its feasibility
                                                                                   study and review.
                                                                                   Sec. 310. Sacramento River, Glenn-Colusa, California
                                                                                     This section deauthorizes a portion of the project for flood control
                                                                                   in the Sacramento River, California, consisting of a riverbed gra-
                                                                                   dient restoration facility at the Glenn-Colusa Irrigation District In-
                                                                                   take.
                                                                                   Sec. 311. Lake Isabella, California
                                                                                     This section provides the Corps with the authority to acquire real
                                                                                   property to support the Isabella Dam Safety Modification Project,
                                                                                   and the ability to transfer this property to any Federal agency




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   without reimbursement.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00089   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      90

                                                                                   Sec. 312. Lower San Joaquin River Flood Control Project
                                                                                     This section aligns the project for flood risk management and the
                                                                                   second phase of the feasibility study for flood risk management in
                                                                                   the Lower San Juaquin River.
                                                                                   Sec. 313. San Diego River and Mission Bay, San Diego County,
                                                                                       California
                                                                                     This section deauthorizes a portion of the project for flood control
                                                                                   and navigation in San Diego River and Mission Bay, San Diego
                                                                                   County, California.
                                                                                   Sec. 314. San Francisco, California, Waterfront Area
                                                                                     This section clarifies a declaration of non-navigability for the San
                                                                                   Francisco Waterfront Area.
                                                                                   Sec. 315. Western Pacific Interceptor Canal, Sacramento River,
                                                                                        California
                                                                                      This section deauthorizes a portion of levee in the Sacramento
                                                                                   River Flood Control Project that is associated with the Western Pa-
                                                                                   cific Interceptor Canal.
                                                                                   Sec. 316. Rio Grande Environmental Management Program, Colo-
                                                                                       rado, New Mexico and Texas
                                                                                     This section reauthorizes the Rio Grande Environmental Man-
                                                                                   agement Program through 2029.
                                                                                   Sec. 317. New London Harbor waterfront channel, Connecticut
                                                                                     This section deauthorizes a portion of the project for navigation
                                                                                   in New London Harbor, Connecticut.
                                                                                   Sec. 318. Washington Harbor, District of Columbia
                                                                                     This section deauthorizes a portion of the project for navigation
                                                                                   in Washington Harbor, District of Columbia.
                                                                                   Sec. 319. Central Everglades, Florida
                                                                                     This section clarifies that the Corps is directed to carry out the
                                                                                   Everglades Agricultural Area modification (authorized in WRDA
                                                                                   2018) as part of the ongoing Central Everglades Planning Project.
                                                                                   Sec. 320. Miami River, Florida
                                                                                     This section deauthorizes a portion of the project for navigation
                                                                                   in Miami River, Florida.
                                                                                   Sec. 321. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper
                                                                                       St. Johns River Basin, Florida
                                                                                     This section deauthorizes a portion of the project for flood control
                                                                                   and other purposes in the Upper St. Johns River Basin, Florida.
                                                                                   Sec. 322. Calcasieu River and Pass, Louisiana
                                                                                     This section directs the Secretary to issue a report to the Com-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   mittees on the feasibility of a potential modification to the
                                                                                   Calcasieu River and Pass Dredged Material Management Plan.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00090   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      91

                                                                                   Sec. 323. San Juan-Chama Project, Abiquiu Dam, New Mexico
                                                                                      This section would remove the 200,000-acre-foot storage limita-
                                                                                   tion at Abiquiu Reservoir and allow for additional storage of either
                                                                                   San-Juan Chama or native water if the entity requesting the stor-
                                                                                   age acquires the necessary property interests to accommodate the
                                                                                   storage.
                                                                                   Sec. 324. Pawcatuck River, Little Narragansett Bay and Watch Hill
                                                                                       Cove, Rhode Island And Connecticut
                                                                                     This section deauthorizes a portion of the project for navigation
                                                                                   in Pawcatuck River, Little Narragansett Bay and Watch Hill Cove,
                                                                                   Rhode Island and Connecticut.
                                                                                   Sec. 325. Harris County, Texas
                                                                                     This section repeals Section 575 of the Water Resources Develop-
                                                                                   ment Act of 1996.
                                                                                   Sec. 326. Cap Sante Waterway, Washington
                                                                                     This section deauthorizes a portion of the project for navigation
                                                                                   in Cap Sante Waterway and Navigation Channel, Skagit County,
                                                                                   Washington.
                                                                                   Sec. 327. Regional sediment management
                                                                                     This section directs the Secretary to expedite regional sediment
                                                                                   management activities related to the Federal navigation project in
                                                                                   Portsmouth, New Hampshire, as a source of suitable sediment to
                                                                                   reinforce the stone revetment at Nantasket Beach, Hull, Massachu-
                                                                                   setts.
                                                                                   Sec. 328. Additional assistance for critical projects
                                                                                      This section makes modifications to 14 projects for environmental
                                                                                   infrastructure which were included in the Corps’ Annual Report to
                                                                                   Congress for 2019 and 2020. This section also includes a modifica-
                                                                                   tion to the authority related to the Lowell Creek Tunnel, Alaska,
                                                                                   authorized by section 5032(a) of the Water Resources Development
                                                                                   Act of 2007.
                                                                                   Sec. 329. Project modification authorizations
                                                                                     This section modifies the water supply contracts for three
                                                                                   projects at the request of the non-Federal interest. The section also
                                                                                   makes modifications to two projects for flood risk management.
                                                                                   Sec. 330. Application of credit
                                                                                      This section allows Louisiana Coastal Area project credit to be
                                                                                   applied against obligations by the State of Louisiana related to the
                                                                                   Greater New Orleans Hurricane and Storm Damage Risk Reduc-
                                                                                   tion System Project.
                                                                                   Sec. 331. Project reauthorizations
                                                                                     This section directs the Corps to study and submit a report to




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Congress on the feasibility of reauthorizing four projects that were
                                                                                   previously deauthorized.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00091   Fmt 6659   Sfmt 6602   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      92

                                                                                   Sec. 332. Conveyances
                                                                                     This section authorizes the Corps to convey real property owned
                                                                                   by the Federal government in the following locations: Eufaula, Ala-
                                                                                   bama; Montgomery, Alabama; Massac County, Illinois; Clinton,
                                                                                   Missouri; Tri-Country Levee District, Missouri; Judge Joseph Bark-
                                                                                   er, Jr., House, Ohio; Leaburg Fish Hatchery, Oregon; and Willam-
                                                                                   ette Falls Locks, Oregon.
                                                                                     In carrying out the requirements of this section, including sub-
                                                                                   section 332(h) relating to the conveyance of the Judge Joseph Bark-
                                                                                   er, Jr. House, Ohio, nothing in this section affects the application
                                                                                   of section 120(h) of the Comprehensive Environmental Response,
                                                                                   Cleanup, and Liability Act (42 U.S.C. 9620(h)) to such action.
                                                                                   Sec. 333. Repeals
                                                                                     This section repeals previous WRDA deauthorization provisions.
                                                                                                       TITLE IV—WATER RESOURCES INVESTMENTS

                                                                                   Sec. 401. Project authorizations
                                                                                     This section authorizes 34 water resources projects that have
                                                                                   completed technical review by the Corps and are recommended by
                                                                                   the Chief of Engineers. The projects are authorized to be carried
                                                                                   out in accordance with the plan, and subject to the conditions, de-
                                                                                   scribed in the Chief’s Reports. Each of the projects has as its pri-
                                                                                   mary purpose, one of the following: navigation, hurricane and
                                                                                   storm damage risk reduction, flood risk management, water supply,
                                                                                   or ecosystem restoration. This section also authorizes four project
                                                                                   modifications for previously authorized projects.
                                                                                   Sec. 402. Special rules
                                                                                     This section provides additional guidance for certain projects.
                                                                                   Sec. 403. Authorization of projects based on feasibility studies pre-
                                                                                        pared by non-federal interests
                                                                                     This section authorizes four water resources development and
                                                                                   conservation projects that were prepared by non-Federal interests
                                                                                   and have undergone review assessments by the Chief of Engineers.
                                                                                   These projects are authorized to be carried out in accordance with
                                                                                   the plan, and subject to the modifications or conditions described
                                                                                   in the review assessments.
                                                                                         CHANGES IN EXISTING LAW MADE BY THE BILL, AS REPORTED
                                                                                     In compliance with clause 3(e) of rule XIII of the Rules of the
                                                                                   House of Representatives, changes in existing law made by the bill,
                                                                                   as reported, are shown as follows (existing law proposed to be omit-
                                                                                   ted is enclosed in black brackets, new matter is printed in italics,
                                                                                   and existing law in which no change is proposed is shown in
                                                                                   roman):

                                                                                                       SECTION 14003 OF THE CARES ACT
                                                                                     øSEC. 14003. Any discretionary appropriation for the Corps of




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                   Engineers derived from the Harbor Maintenance Trust Fund (not
                                                                                   to exceed the total amount deposited in the Harbor Maintenance
                                                                                   Trust Fund in the prior fiscal year) shall be subtracted from the




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00092   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      93

                                                                                   estimate of discretionary budget authority and outlays for any esti-
                                                                                   mate of an appropriations Act under the Congressional Budget and
                                                                                   Impoundment Control Act of 1974 or the Balanced Budget and
                                                                                   Emergency Deficit Control Act of 1985: Provided, That the modi-
                                                                                   fications described in this section shall not take effect until the ear-
                                                                                   lier of January 1, 2021 or the date of enactment of legislation au-
                                                                                   thorizing the development of water resources and shall remain in
                                                                                   effect thereafter.¿
                                                                                      SEC. 14003. Section 251(b)(2) of the Balanced Budget and Emer-
                                                                                   gency Deficit Control Act of 1985 (2 U.S.C. 901(b)(2)) is amended
                                                                                   by adding at the end the following:
                                                                                               ‘‘(H) HARBOR MAINTENANCE ACTIVITIES.—If, for any fiscal
                                                                                            year, appropriations for the Construction, Mississippi River
                                                                                            and Tributaries, and Operation and Maintenance accounts
                                                                                            of the Corps of Engineers are enacted that are derived from
                                                                                            the Harbor Maintenance Trust Fund established under sec-
                                                                                            tion 9505(a) of the Internal Revenue Code of 1986 and that
                                                                                            the Congress designates in statute as being for harbor oper-
                                                                                            ations and maintenance activities, then the adjustment for
                                                                                            that fiscal year shall be the total of such appropriations
                                                                                            that are derived from such Fund and designated as being
                                                                                            for harbor operations and maintenance activities.’’.

                                                                                          WATER RESOURCES DEVELOPMENT ACT OF 1986

                                                                                              *            *           *              *           *          *           *
                                                                                                                 TITLE I—COST SHARING
                                                                                              *            *           *              *           *          *           *
                                                                                   SEC. 103. FLOOD CONTROL AND OTHER PURPOSES.
                                                                                     (a) FLOOD CONTROL.—
                                                                                          (1) GENERAL RULE.—The non-Federal interests for a project
                                                                                          with costs assigned to flood control (other than a nonstructural
                                                                                          project) shall—
                                                                                                  (A) pay 5 percent of the cost of the project assigned to
                                                                                               flood control during construction of the project;
                                                                                                  (B) provide all lands, easements, rights-of-way, and
                                                                                               dredged material disposal areas required only for flood
                                                                                               control and perform all related necessary relocations; and
                                                                                                  (C) provide that portion of the joint costs of lands, ease-
                                                                                               ments, rights-of-way, dredged material disposal areas, and
                                                                                               relocations which is assigned to flood control.
                                                                                             (2) 35 PERCENT MINIMUM CONTRIBUTION.—If the value of the
                                                                                          contributions required under paragraph (1) of this subsection
                                                                                          is less than 35 percent of the cost of the project assigned to
                                                                                          flood control, the non-Federal interest shall pay during con-
                                                                                          struction of the project such additional amounts as are nec-
                                                                                          essary so that the total contribution of the non-Federal inter-
                                                                                          ests under this subsection is equal to 35 percent of the cost of
                                                                                          the project assigned to flood control.




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                             (3) 50 PERCENT MAXIMUM.—The non-Federal share under
                                                                                          paragraph (1) shall not exceed 50 percent of the cost of the
                                                                                          project assigned to flood control. The preceding sentence does




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00093   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      94

                                                                                        not modify the requirement of paragraph (1)(A) of this sub-
                                                                                        section.
                                                                                           (4) DEFERRED PAYMENT OF AMOUNT EXCEEDING 30 PERCENT.—
                                                                                        If the total amount of the contribution required under
                                                                                        paragaph (1) of this subsection exceeds 30 percent of the cost
                                                                                        of the project assigned to flood control, the non-Federal inter-
                                                                                        ests may pay the amount of the excess to the Secretary over
                                                                                        a 15-year period (or such shorter period as many be agreed to
                                                                                        by the Secretary and the non-Federal interests) beginning on
                                                                                        the date construction of the project or separable element is
                                                                                        completed, at an interest rate determined pursuant to section
                                                                                        106. The preceding sentence does not modify the requirement
                                                                                        of paragraph (1)(A) of this subsection.
                                                                                     (b) øNONSTRUCTURAL FLOOD CONTROL PROJECTS¿ PROJECTS
                                                                                   USING NONSTRUCTURAL, NATURAL, OR NATURE-BASED FEATURES.—
                                                                                           (1) IN GENERAL.—The non-Federal share of the cost of ønon-
                                                                                        structural flood control measures¿ a flood risk management or
                                                                                        hurricane and storm damage risk reduction measure using a
                                                                                        nonstructural feature, or a natural feature or nature-based fea-
                                                                                        ture (as those terms are defined in section 1184(a) of the Water
                                                                                        Resources Development Act of 2016 (33 U.S.C. 2289a(a))), shall
                                                                                        be 35 percent of the cost of such measures. The non-Federal in-
                                                                                        terests for any such measures shall be required to provide all
                                                                                        lands, easements, rights-of-way, dredged material disposal
                                                                                        areas, and relocations necessary for the project, but shall not
                                                                                        be required to contribute any amount in øcash during construc-
                                                                                        tion of the project¿ cash during construction for a non-
                                                                                        structural feature if the costs of land, easements, rights-of-way,
                                                                                        dredged material disposal areas, and relocations for such fea-
                                                                                        ture are estimated to exceed 35 percent.
                                                                                           (2) NON-FEDERAL CONTRIBUTION IN EXCESS OF 35 PERCENT.—
                                                                                        At any time during construction of a project, if the Secretary
                                                                                        determines that the costs of land, easements, rights-of-way,
                                                                                        dredged material disposal areas, and relocations for the
                                                                                        project, in combination with other costs contributed by the non-
                                                                                        Federal interests, will exceed 35 percent, any additional costs
                                                                                        for the project (not to exceed 65 percent of the total costs of the
                                                                                        project) shall be a Federal responsibility and shall be contrib-
                                                                                        uted during construction as part of the Federal share.
                                                                                     (c) OTHER PURPOSES.—The non-Federal share of the cost as-
                                                                                   signed to other project purposes shall be as follows:
                                                                                           (1) hydroelectric power: 100 percent, except that the mar-
                                                                                        keting of such power and the recovery of costs of constructing,
                                                                                        operating, maintaining, and rehabilitating such projects shall
                                                                                        be in accordance with existing law: Provided, That after the
                                                                                        date of enactment of this Act, the Secretary shall not submit
                                                                                        to Congress any proposal for the authorization of any water re-
                                                                                        sources project that has a hydroelectric power component un-
                                                                                        less such proposal contains the comments of the appropriate
                                                                                        Power Marketing Adminstrator designated pursuant to section
                                                                                        302 of the Department of Energy Organization Act (Public Law
                                                                                        95–91) concerning the appropriate Power Marketing Adminis-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        tration’s ability to market the hydroelectric power expected to
                                                                                        be generated and not required in the operation of the project
                                                                                        under the applicable Federal power marketing law, so that,




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00094   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      95

                                                                                          100 percent of operation, maintenance and replacement costs,
                                                                                          100 percent of the capital investment allocated to the purpose
                                                                                          of hydroelectric power (with interest at rates established pur-
                                                                                          suant to or prescribed by applicable law), and any other costs
                                                                                          assigned in accordance with law for return from power reve-
                                                                                          nues can be returned within the period set for the return of
                                                                                          such costs by or pursuant to such applicable Federal power
                                                                                          marketing law;
                                                                                            (2) municipal and industrial water supply: 100 percent;
                                                                                            (3) agricultural water supply: 35 percent;
                                                                                            (4) recreation, including recreational navigation: 50 percent
                                                                                          of separable costs and, in the case of any harbor or inland har-
                                                                                          bor or channel project, 50 percent of joint and separable costs
                                                                                          allocated to recreational navigation;
                                                                                            (5) hurricane and storm damage reduction: 35 percent;
                                                                                            (6) aquatic plant control: 50 percent of control operations;
                                                                                          and
                                                                                            (7) environmental protection and restoration: 35 percent; ex-
                                                                                          cept that nothing in this paragraph shall affect or limit the ap-
                                                                                          plicability of section 906.
                                                                                       (d) CERTAIN OTHER COSTS ASSIGNED TO PROJECT PURPOSES.—
                                                                                            (1) CONSTRUCTION.—Costs of constructing projects or meas-
                                                                                          ures for beach erosion control and water quality enhancement
                                                                                          shall be assigned to appropriate project purposes listed in sub-
                                                                                          sections (a), (b), and (c) and shall be shared in the same per-
                                                                                          centage as the purposes to which the costs are assigned, except
                                                                                          that all costs assigned to benefits to privately owned shores
                                                                                          (where use of such shores is limited to private interests) or to
                                                                                          prevention of losses of private lands shall be borne by non-Fed-
                                                                                          eral interests and all costs assigned to the protection of feder-
                                                                                          ally owned shores shall be borne by the United States.
                                                                                            (2) PERIODIC NOURISHMENT.—
                                                                                                 (A) IN GENERAL.—In the case of a project authorized for
                                                                                               construction after December 31, 1999, except for a project
                                                                                               for which a District Engineer’s Report is completed by that
                                                                                               date, the non-Federal cost of the periodic nourishment of
                                                                                               the project, or any measure for shore protection or beach
                                                                                               erosion control for the project, that is carried out—
                                                                                                       (i) after January 1, 2001, shall be 40 percent;
                                                                                                       (ii) after January 1, 2002, shall be 45 percent; and
                                                                                                       (iii) after January 1, 2003, shall be 50 percent.
                                                                                                 (B) BENEFITS TO PRIVATELY OWNED SHORES.—All costs
                                                                                               assigned to benefits of periodic nourishment projects or
                                                                                               measures to privately owned shores (where use of such
                                                                                               shores is limited to private interests) or to prevention of
                                                                                               losses of private land shall be borne by the non-Federal in-
                                                                                               terest.
                                                                                                 (C) BENEFITS TO FEDERALLY OWNED SHORES.—All costs
                                                                                               assigned to the protection of federally owned shores for
                                                                                               periodic nourishment measures shall be borne by the
                                                                                               United States.
                                                                                       (e) APPLICABILITY.—




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                            (1) IN GENERAL.—This section applies to any project (includ-
                                                                                          ing any small project which is not specifically authorized by
                                                                                          Congress and for which the Secretary has not approved fund-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00095   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      96

                                                                                         ing before the date of enactment of this Act), or separable ele-
                                                                                         ment thereof, on which physical construction is initiated after
                                                                                         April 30, 1986, as determined by the Secretary, except as pro-
                                                                                         vided in paragraph (2). For the purpose of the preceding sen-
                                                                                         tence, physical construction shall be considered to be initiated
                                                                                         on the date of the award of a construction contract.
                                                                                           (2) EXCEPTIONS.—This section shall not apply to the Yazoo
                                                                                         Basin, Mississippi, Demonstration Erosion Control Program,
                                                                                         authorized by Public Law 98–8, or to the Harlan, Kentucky, or
                                                                                         Barbourville, Kentucky, elements of the project authorized by
                                                                                         section 202 of Public Law 96–367.
                                                                                      (f) DEFINITION OF SEPARABLE ELEMENT.—For purposes of this
                                                                                   Act, the term ‘‘separable element’’ means a portion of a project—
                                                                                           (1) which is physically separable from other portions of the
                                                                                         project; and
                                                                                           (2) which—
                                                                                                 (A) achieves hydrologic effects, or
                                                                                                 (B) produces physical or economic benefits, which are
                                                                                              separately identifiable from those produced by other por-
                                                                                              tions of the project.
                                                                                      (g) DEFERRAL OF PAYMENT.—(1) With respect to the projects list-
                                                                                   ed in paragraph (2), no amount of the non-Federal share required
                                                                                   under this section shall be required to be paid during the three-
                                                                                   year period beginning on the date of enactment of this Act.
                                                                                      (2) The projects referred to in paragraph (1) are the following:
                                                                                           (A) Boeuf and Tensas Rivers, Tensas Basin, Louisiana and
                                                                                         Arkansas, authorized by the Flood Control Act of 1946;
                                                                                           (B) Eight Mile Creek, Arkansas, authorized by Public Law
                                                                                         99–88; and
                                                                                           (C) Rocky Bayou Area, Yazoo Blackwater Area, Yazoo Basin,
                                                                                         Mississippi, authorized by the Flood Control Act approved Au-
                                                                                         gust 18, 1941.
                                                                                      (h) ASSIGNED JOINT AND SEPARABLE COSTS.—The share of the
                                                                                   costs specified under this section for each project purpose shall
                                                                                   apply to the joint and separable costs of construction of each project
                                                                                   assigned to that purpose, except as otherwise specified in this Act.
                                                                                      (i) LANDS, EASEMENTS, RIGHTS-OF-WAY, DREDGED MATERIAL DIS-
                                                                                   POSAL AREAS, AND RELOCATIONS.—Except as provided under sec-
                                                                                   tion 906(c), the non-Federal interests for a project to which this
                                                                                   section applies shall provide all lands, easements, rights-of-way,
                                                                                   and dredged material disposal areas required for the project and
                                                                                   perform all necessary relocations, except to the extent limited by
                                                                                   any provision of this section. The value of any contribution under
                                                                                   the preceding sentence shall be included in the non-Federal share
                                                                                   of the project specified in this section.
                                                                                      (j) AGREEMENT.—
                                                                                           (1) REQUIREMENT FOR AGREEMENT.—Any project to which
                                                                                         this section applies (other than a project for hydroelectric
                                                                                         power) shall be initiated only after non-Federal interests have
                                                                                         entered into binding agreements with the Secretary to pay 100
                                                                                         percent of the operations, maintenance, and replacement and
                                                                                         rehabilitation costs of the project, to pay the non-Federal share




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         of the costs of construction required by this section, and to hold
                                                                                         and save the United States free from damages due to the con-
                                                                                         struction or operation and maintenance of the project, except




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00096   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      97

                                                                                         for damages due to the fault or negligence of the United States
                                                                                         or its contractors.
                                                                                            (2) ELEMENTS OF AGREEMENT.—The agreement required pur-
                                                                                         suant to paragraph (1) shall be in accordance with the require-
                                                                                         ments of section 221 of the Flood Control Act of 1970 (84 Stat.
                                                                                         1818) and shall provide for the rights and duties of the United
                                                                                         States and the non-Federal interest with respect to the con-
                                                                                         struction, operation, and maintenance of the project, including,
                                                                                         but not limited to, provisions specifying that, in the event the
                                                                                         non-Federal interest fails to provide the required non-Federal
                                                                                         share of costs for such work, the Secretary—
                                                                                                 (A) shall terminate or suspend work on the project un-
                                                                                              less the Secretary determines that continuation of the
                                                                                              work is in the interest of the United States or is necessary
                                                                                              in order to satisfy agreements with other non-Federal in-
                                                                                              terests in connection with the project; and
                                                                                                 (B) may terminate or adjust the rights and privileges of
                                                                                              the non-Federal interest to project outputs under the
                                                                                              terms of the agreement.
                                                                                       (k) PAYMENT OPTIONS.—øExcept as¿
                                                                                            (1) IN GENERAL.—Except as otherwise provided in this sec-
                                                                                         tion, the Secretary may permit the full non-Federal contribu-
                                                                                         tion to be made without interest during construction of the
                                                                                         project or separable element, or with interest at a rate deter-
                                                                                         mined pursuant to section 106 over a period of not more than
                                                                                         thirty years from the date of completion of the project or sepa-
                                                                                         rable element. Repayment contracts shall provide for recalcula-
                                                                                         tion of the interest rate at five-year intervals.
                                                                                            (2) RENEGOTIATION OF TERMS.—
                                                                                                 (A) IN GENERAL.—At the request of a non-Federal inter-
                                                                                              est, the Secretary and the non-Federal interest may renego-
                                                                                              tiate the terms and conditions of an eligible deferred pay-
                                                                                              ment, including—
                                                                                                      (i) permitting the non-Federal contribution to be
                                                                                                   made without interest, pursuant to paragraph (1);
                                                                                                      (ii) recalculation of the interest rate;
                                                                                                      (iii) full or partial forgiveness of interest accrued
                                                                                                   during the period of construction; and
                                                                                                      (iv) a credit against construction interest for a non-
                                                                                                   Federal investment that benefits the completion or per-
                                                                                                   formance of the project or separable element.
                                                                                                 (B) ELIGIBLE DEFERRED PAYMENT.—An eligible deferred
                                                                                              payment agreement under subparagraph (A) is an agree-
                                                                                              ment for which—
                                                                                                      (i) the non-Federal contribution was made with in-
                                                                                                   terest;
                                                                                                      (ii) the period of project construction exceeds 10 years
                                                                                                   from the execution of a project partnership agreement
                                                                                                   or appropriation of funds; and
                                                                                                      (iii) the construction interest exceeds $45,000,000.
                                                                                                 (C) CREDIT FOR NON-FEDERAL CONTRIBUTION.—
                                                                                                      (i) IN GENERAL.—The Secretary is authorized to cred-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                   it any costs incurred by the non-Federal interest (in-
                                                                                                   cluding in-kind contributions) to remedy a design or
                                                                                                   construction deficiency of a covered project or separable




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00097   Fmt 6659   Sfmt 6603   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      98

                                                                                                  element toward the non-Federal share of the cost of the
                                                                                                  covered project, if the Secretary determines the remedy
                                                                                                  to be integral to the completion or performance of the
                                                                                                  covered project.
                                                                                                     (ii) CREDIT OF COSTS.—If the non-Federal interest in-
                                                                                                  curs costs or in-kind contributions for a project to rem-
                                                                                                  edy a design or construction deficiency of a project or
                                                                                                  separable element which has a 100 percent Federal cost
                                                                                                  share, and the Secretary determines the remedy to be
                                                                                                  integral to the completion or performance of the project,
                                                                                                  the Secretary is authorized to credit such costs to any
                                                                                                  interest accrued on a deferred non-Federal contribu-
                                                                                                  tion.
                                                                                     (l) DELAY OF INITIAL PAYMENT.—At the request of any non-Fed-
                                                                                   eral interest the Secretary may permit such non-Federal interest to
                                                                                   delay the initial payment of any non-Federal contribution under
                                                                                   this section or section 101 for up to one year after the date when
                                                                                   construction is begun on the project for which such contribution is
                                                                                   to be made. Any such delay in initial payment shall be subject to
                                                                                   interest charges for up to six months at a rate determined pursu-
                                                                                   ant to section 106.
                                                                                     (m) ABILITY TO PAY.—
                                                                                           (1) IN GENERAL.—Any cost-sharing agreement under this sec-
                                                                                        tion for a feasibility study, or for construction of an environ-
                                                                                        mental protection and restoration project, a flood control
                                                                                        project, a project for navigation, storm damage protection,
                                                                                        shoreline erosion, hurricane protection, or recreation, or an ag-
                                                                                        ricultural water supply project, shall be subject to the ability
                                                                                        of the non-Federal interest to pay.
                                                                                           (2) CRITERIA AND PROCEDURES.—The ability of a non-Federal
                                                                                        interest to pay shall be determined by the Secretary in accord-
                                                                                        ance with criteria and procedures in effect under paragraph (3)
                                                                                        on the day before the date of enactment of the Water Re-
                                                                                        sources Development Act of 2000; except that such criteria and
                                                                                        procedures shall be revised, and new criteria and procedures
                                                                                        shall be developed, not later than December 31, 2007 to reflect
                                                                                        the requirements of such paragraph (3).
                                                                                           (3) REVISION OF CRITERIA AND PROCEDURES.—In revising cri-
                                                                                        teria and procedures pursuant to paragraph (2), the Sec-
                                                                                        retary—
                                                                                                (A) shall consider—
                                                                                                     (i) per capita income data for the county or counties
                                                                                                  in which the project is to be located; and
                                                                                                     (ii) the per capita non-Federal cost of construction of
                                                                                                  the project for the county or counties in which the
                                                                                                  project is to be located; and
                                                                                                (B) may consider additional criteria relating to the non-
                                                                                             Federal interest’s financial ability to carry out its cost-
                                                                                             sharing responsibilities, to the extent that the application
                                                                                             of such criteria does not eliminate areas from eligibility for
                                                                                             a reduction in the non-Federal share as determined under
                                                                                             subparagraph (A).




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                           (4) NON-FEDERAL SHARE.—Notwithstanding subsection (a),
                                                                                        the Secretary may reduce the requirement that a non-Federal
                                                                                        interest make a cash contribution for any project that is deter-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00098   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                      99

                                                                                         mined to be eligible for a reduction in the non-Federal share
                                                                                         under criteria and procedures in effect under paragraphs (1),
                                                                                         (2), and (3).
                                                                                       (n) NON-FEDERAL CONTRIBUTIONS.—
                                                                                           (1) PROHIBITION ON SOLICITATION OF EXCESS CONTRIBU-
                                                                                         TIONS.—The Secretary may not—
                                                                                                (A) solicit contributions from non-Federal interests for
                                                                                              costs of constructing authorized water resources projects or
                                                                                              measures in excess of the non-Federal share assigned to
                                                                                              the appropriate project purposes listed in subsections (a),
                                                                                              (b), and (c); or
                                                                                                (B) condition Federal participation in such projects or
                                                                                              measures on the receipt of such contributions.
                                                                                           (2) LIMITATION ON STATUTORY CONSTRUCTION.—Nothing in
                                                                                         this subsection shall be construed to affect the Secretary’s au-
                                                                                         thority under section 903(c).
                                                                                              *            *           *              *           *          *           *
                                                                                                         TITLE II—HARBOR DEVELOPMENT
                                                                                              *            *           *              *           *          *           *
                                                                                   SEC. 203. STUDY OF WATER RESOURCES DEVELOPMENT PROJECTS BY
                                                                                               NON-FEDERAL INTERESTS.
                                                                                     (a) SUBMISSION TO SECRETARY.—
                                                                                          (1) IN GENERAL.—A non-Federal interest may undertake a
                                                                                        federally authorized feasibility study of a proposed water re-
                                                                                        sources development project and submit the study to the Sec-
                                                                                        retary.
                                                                                           (2) GUIDELINES.—To assist non-Federal interests, the Sec-
                                                                                        retary, as soon as practicable, shall issue guidelines for feasi-
                                                                                        bility studies of water resources development projects to pro-
                                                                                        vide sufficient information for the formulation of the studies.
                                                                                     (b) REVIEW BY SECRETARY.—The Secretary shall review each fea-
                                                                                   sibility study received under subsection (a)(1) for the purpose of de-
                                                                                   termining whether or not the study, and the process under which
                                                                                   the study was developed, each comply with Federal laws and regu-
                                                                                   lations applicable to feasibility studies of water resources develop-
                                                                                   ment projects.
                                                                                     (c) SUBMISSION TO CONGRESS.—
                                                                                           (1) REVIEW AND SUBMISSION OF STUDIES TO CONGRESS.—Not
                                                                                        later than 180 days after the date of receipt of a feasibility
                                                                                        study of a project under subsection (a)(1), the Secretary shall
                                                                                        submit to the Committee on Environment and Public Works of
                                                                                        the Senate and the Committee on Transportation and Infra-
                                                                                        structure of the House of Representatives øa report¿ an assess-
                                                                                        ment that describes—
                                                                                               (A) the results of the Secretary’s review of the study
                                                                                             under subsection (b), including a determination of whether
                                                                                             the project is feasible;
                                                                                               (B) any recommendations the Secretary may have con-
                                                                                             cerning the plan or design of the project; and
                                                                                               (C) any conditions the Secretary may require for con-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                             struction of the project.
                                                                                           (2) LIMITATION.—The completion of the review by the Sec-
                                                                                        retary of a feasibility study that has been submitted under




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00099   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  100

                                                                                        subsection (a)(1) may not be delayed as a result of consider-
                                                                                        ation being given to changes in policy or priority with respect
                                                                                        to project consideration.
                                                                                     (d) CREDIT.—If a project for which a feasibility study has been
                                                                                   submitted under subsection (a)(1) is authorized by a Federal law
                                                                                   enacted after the date of the submission to Congress under sub-
                                                                                   section (c), the Secretary shall credit toward the non-Federal share
                                                                                   of the cost of construction of the project an amount equal to the
                                                                                   portion of the cost of developing the study that would have been
                                                                                   the responsibility of the United States if the study had been devel-
                                                                                   oped by the Secretary.
                                                                                     (e) REVIEW AND TECHNICAL ASSISTANCE.—
                                                                                           (1) REVIEW.—The Secretary may accept and expend funds
                                                                                        provided by non-Federal interests to undertake reviews, in-
                                                                                        spections, certifications, and other activities that are the re-
                                                                                        sponsibility of the Secretary in carrying out this section.
                                                                                           (2) TECHNICAL ASSISTANCE.—At the request of a non-Federal
                                                                                        interest, the Secretary shall provide to the non-Federal interest
                                                                                        technical assistance relating to any aspect of a feasibility study
                                                                                        if the non-Federal interest contracts with the Secretary to pay
                                                                                        all costs of providing such technical assistance.
                                                                                           (3) LIMITATION.—Funds provided by non-Federal interests
                                                                                        under this subsection shall not be eligible for credit under sub-
                                                                                        section (d) or reimbursement.
                                                                                           (4) IMPARTIAL DECISIONMAKING.—In carrying out this section,
                                                                                        the Secretary shall ensure that the use of funds accepted from
                                                                                        a non-Federal interest will not affect the impartial decision-
                                                                                        making of the Secretary, either substantively or procedurally.
                                                                                           (5) SAVINGS PROVISION.—The provision of technical assist-
                                                                                        ance by the Secretary under paragraph (2)—
                                                                                                (A) shall not be considered to be an approval or endorse-
                                                                                             ment of the feasibility study; and
                                                                                                (B) shall not affect the responsibilities of the Secretary
                                                                                             under subsections (b) and (c).
                                                                                   SEC. 204. CONSTRUCTION OF WATER RESOURCES DEVELOPMENT
                                                                                              PROJECTS BY NON-FEDERAL INTERESTS.
                                                                                     (a) WATER RESOURCES DEVELOPMENT PROJECT DEFINED.—In this
                                                                                   section, the term ‘‘water resources development project’’ means a
                                                                                   project recommendation that results from—
                                                                                           (1) a feasibility report, as such term is defined in section
                                                                                        7001(f) of the Water Resources Reform and Development Act of
                                                                                        2014;
                                                                                           (2) a completed feasibility study developed under section 203;
                                                                                        or
                                                                                           (3) a final feasibility study for water resources development
                                                                                        and conservation and other purposes that is specifically au-
                                                                                        thorized by Congress to be carried out by the Secretary.
                                                                                     (b) AUTHORITY.—
                                                                                           (1) IN GENERAL.—A non-Federal interest may carry out a fed-
                                                                                        erally authorized water resources development project, or sepa-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                        rable element thereof—
                                                                                                (A) in accordance with a plan approved by the Secretary
                                                                                             for the project or separable element; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00100   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  101

                                                                                                 (B) subject to any conditions that the Secretary may re-
                                                                                               quire, including any conditions specified under section
                                                                                               203(c)(3).
                                                                                            (2) CONDITIONS.—Before carrying out a water resources de-
                                                                                          velopment project, or separable element thereof, under this
                                                                                          section, a non-Federal interest shall—
                                                                                                 (A) obtain any permit or approval required in connection
                                                                                               with the project or separable element under Federal or
                                                                                               State law, except as provided in paragraph (3); and
                                                                                                 (B) ensure that a final environmental impact statement
                                                                                               or environmental assessment, as appropriate, for the
                                                                                               project or separable element has been filed.
                                                                                            (3) PERMIT EXCEPTION.—
                                                                                                 (A) IN GENERAL.—For a project described in subsection
                                                                                               (a)(1) or subsection (a)(3), or a separable element thereof,
                                                                                               with respect to which a written agreement described in
                                                                                               subparagraph (B) has been entered into, a non-Federal in-
                                                                                               terest that carries out a project under this section shall not
                                                                                               be required to obtain any Federal permits or approvals
                                                                                               that would not be required if the Secretary carried out the
                                                                                               project or separable element unless significant new cir-
                                                                                               cumstances or information relevant to environmental con-
                                                                                               cerns or compliance have arisen since development of the
                                                                                               project recommendation.
                                                                                                 (B) WRITTEN AGREEMENT.—For purposes of this para-
                                                                                               graph, a written agreement shall provide that the non-
                                                                                               Federal interest shall comply with the same legal and
                                                                                               technical requirements that would apply if the project or
                                                                                               separable element were carried out by the Secretary, in-
                                                                                               cluding all mitigation required to offset environmental im-
                                                                                               pacts of the project or separable element as determined by
                                                                                               the Secretary.
                                                                                                 (C) CERTIFICATIONS.—Notwithstanding subparagraph
                                                                                               (A), if a non-Federal interest carrying out a project under
                                                                                               this section would, in the absence of a written agreement
                                                                                               entered into under this paragraph, be required to obtain a
                                                                                               certification from a State under Federal law to carry out
                                                                                               the project, such certification shall still be required if a
                                                                                               written agreement is entered into with respect to the
                                                                                               project under this paragraph.
                                                                                            (4) DATA SHARING.—
                                                                                                 (A) IN GENERAL.—If a non-Federal interest for a water
                                                                                               resources development project begins to carry out that
                                                                                               water resources development project under this section,
                                                                                               the non-Federal interest may request that the Secretary
                                                                                               transfer to the non-Federal interest all relevant data and
                                                                                               documentation under the control of the Secretary with re-
                                                                                               spect to that water resources development project.
                                                                                                 (B) DEADLINE.—Except as provided in subparagraph (C),
                                                                                               the Secretary shall transfer the data and documentation
                                                                                               requested by a non-Federal interest under subparagraph




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                               (A) not later than the date that is 90 days after the date
                                                                                               on which the non-Federal interest so requests such data
                                                                                               and documentation.




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00101   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  102

                                                                                                 (C) LIMITATION.—Nothing in this paragraph obligates
                                                                                               the Secretary to share any data or documentation that the
                                                                                               Secretary considers to be proprietary information.
                                                                                       (c) STUDIES AND ENGINEERING.—
                                                                                            (1) IN GENERAL.—When requested by an appropriate non-
                                                                                          Federal interest, the Secretary shall undertake all necessary
                                                                                          studies, engineering, and technical assistance on construction
                                                                                          for any project to be undertaken under subsection (b), and pro-
                                                                                          vide technical assistance in obtaining all necessary permits for
                                                                                          the construction, if the non-Federal interest contracts with the
                                                                                          Secretary to furnish the United States funds for the studies,
                                                                                          engineering, or technical assistance on construction in the pe-
                                                                                          riod during which the studies, engineering, or technical assist-
                                                                                          ance on construction are being conducted.
                                                                                            (2) NO WAIVER.—Nothing in this section may be construed to
                                                                                          waive any requirement of section 3142 of title 40, United
                                                                                          States Code.
                                                                                            (3) LIMITATION.—Funds provided by non-Federal interests
                                                                                          under this subsection shall not be eligible for credit or reim-
                                                                                          bursement under subsection (d).
                                                                                            (4) IMPARTIAL DECISIONMAKING.—In carrying out this section,
                                                                                          the Secretary shall ensure that the use of funds accepted from
                                                                                          a non-Federal interest will not affect the impartial decision-
                                                                                          making of the Secretary, either substantively or procedurally.
                                                                                       (d) CREDIT OR REIMBURSEMENT.—
                                                                                            (1) GENERAL RULE.—Subject to paragraph (3), a project or
                                                                                          separable element of a project carried out by a non-Federal in-
                                                                                          terest under this section shall be eligible for credit or reim-
                                                                                          bursement for the Federal share of work carried out on a
                                                                                          project or separable element of a project if—
                                                                                                 (A) before initiation of construction of the project or sep-
                                                                                               arable element—
                                                                                                      (i) the Secretary approves the plans for construction
                                                                                                   of the project or separable element of the project by
                                                                                                   the non-Federal interest;
                                                                                                      (ii) the Secretary determines, before approval of the
                                                                                                   plans, that the project or separable element of the
                                                                                                   project is feasible; and
                                                                                                      (iii) the non-Federal interest enters into a written
                                                                                                   agreement with the Secretary under section 221 of the
                                                                                                   Flood Control Act of 1970 (42 U.S.C. 1962d–5b), in-
                                                                                                   cluding an agreement to pay the non-Federal share, if
                                                                                                   any, of the cost of operation and maintenance of the
                                                                                                   project; and
                                                                                                 (B) the Secretary determines that all Federal laws and
                                                                                               regulations applicable to the construction of a water re-
                                                                                               sources development project, and any conditions identified
                                                                                               under subsection (b)(1)(B), were complied with by the non-
                                                                                               Federal interest during construction of the project or sepa-
                                                                                               rable element of the project.
                                                                                            (2) APPLICATION OF CREDIT.—The Secretary may apply credit




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                          toward—
                                                                                                 (A) the non-Federal share of authorized separable ele-
                                                                                               ments of the same project; or




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00102   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  103

                                                                                                 (B) subject to the requirements of this section and sec-
                                                                                              tion 1020 of the Water Resources Reform and Development
                                                                                              Act of 2014, at the request of the non-Federal interest, the
                                                                                              non-Federal share of a different water resources develop-
                                                                                              ment project.
                                                                                            (3) REQUIREMENTS.—The Secretary may only apply credit or
                                                                                          provide reimbursement under paragraph (1) if—
                                                                                                 (A) Congress has authorized construction of the project
                                                                                              or separable element of the project;
                                                                                                 (B) the Secretary certifies that the project has been con-
                                                                                              structed in accordance with—
                                                                                                      (i) all applicable permits or approvals; and
                                                                                                      (ii) this section; and
                                                                                                 (C) in the case of reimbursement, appropriations are pro-
                                                                                              vided by Congress for such purpose.
                                                                                            (4) MONITORING.—The Secretary shall regularly monitor and
                                                                                          audit any water resources development project, or separable
                                                                                          element of a water resources development project, constructed
                                                                                          by a non-Federal interest under this section to ensure that—
                                                                                                 (A) the construction is carried out in compliance with the
                                                                                              requirements of this section; and
                                                                                                 (B) the costs of the construction are reasonable.
                                                                                            (5) DISCRETE SEGMENTS.—
                                                                                                 (A) IN GENERAL.—The Secretary may authorize credit or
                                                                                              reimbursement under this subsection for carrying out a
                                                                                              discrete segment of a federally authorizedwater resources
                                                                                              development project, or separable element thereof, before
                                                                                              final completion of the project or separable element if—
                                                                                                      (i) except as provided in clause (ii), the Secretary de-
                                                                                                   termines that the discrete segment satisfies the re-
                                                                                                   quirements of paragraphs (1) through (4) in the same
                                                                                                   manner as the project or separable element; and
                                                                                                      (ii) notwithstanding paragraph (1)(A)(ii), the Sec-
                                                                                                   retary determines, before the approval of the plans
                                                                                                   under paragraph (1)(A)(i), that the discrete segment is
                                                                                                   technically feasible and environmentally acceptable.
                                                                                                 (B) DETERMINATION.—Credit or reimbursement may not
                                                                                              be made available to a non-Federal interest pursuant to
                                                                                              this paragraph until the Secretary determines that—
                                                                                                      (i) the construction of the discrete segment for which
                                                                                                   credit or reimbursement is requested is complete; and
                                                                                                      (ii) the construction is consistent with the authoriza-
                                                                                                   tion of the applicable water resources development
                                                                                                   project, or separable element thereof, and the plans
                                                                                                   approved under paragraph (1)(A)(i).
                                                                                                 (C) WRITTEN AGREEMENT.—
                                                                                                      (i) IN GENERAL.—As part of the written agreement
                                                                                                   required under paragraph (1)(A)(iii), a non-Federal in-
                                                                                                   terest to be eligible for credit or reimbursement under
                                                                                                   this paragraph shall—
                                                                                                            (I) identify any discrete segment that the non-
                                                                                                         Federal interest may carry out; and




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                            (II) agree to the completion of the water re-
                                                                                                         sources development project, or separable element
                                                                                                         thereof, with respect to which the discrete seg-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00103   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  104

                                                                                                        ment is a part and establish a timeframe for such
                                                                                                        completion.
                                                                                                     (ii) REMITTANCE.—If a non-Federal interest fails to
                                                                                                  complete a water resources development project, or
                                                                                                  separable element thereof, that it agreed to complete
                                                                                                  under clause (i)(II), the non-Federal interest shall
                                                                                                  remit any reimbursements received under this para-
                                                                                                  graph for a discrete segment of such project or sepa-
                                                                                                  rable element.
                                                                                                (D) DISCRETE SEGMENT DEFINED.—In this paragraph, the
                                                                                              term ‘‘discrete segment’’ means a physical portion of a
                                                                                              water resources development project to be carried out, or
                                                                                              separable element thereof—
                                                                                                     (i) described by a non-Federal interest in a written
                                                                                                  agreement required under paragraph (1)(A)(iii); and
                                                                                                     (ii) that the non-Federal interest can operate and
                                                                                                  maintain, independently and without creating a haz-
                                                                                                  ard, in advance of final completion of the water re-
                                                                                                  sources development project, or separable element
                                                                                                  thereof.
                                                                                      (e) NOTIFICATION OF COMMITTEES.—If a non-Federal interest no-
                                                                                   tifies the Secretary that the non-Federal interest intends to carry
                                                                                   out a project, or separable element thereof, under this section, the
                                                                                   Secretary shall provide written notice to the Committee on Envi-
                                                                                   ronment and Public Works of the Senate and the Committee on
                                                                                   Transportation and Infrastructure of the House of Representatives
                                                                                   concerning the intent of the non-Federal interest.
                                                                                      ø(f) OPERATION AND MAINTENANCE.—Whenever a non-Federal in-
                                                                                   terest carries out improvements to a federally authorized harbor or
                                                                                   inland harbor, the Secretary shall be responsible for operation and
                                                                                   maintenance in accordance with section 101(b) if—
                                                                                           ø(1) before construction of the improvements—
                                                                                                ø(A) the Secretary determines that the improvements
                                                                                              are feasible and consistent with the purposes of this title;
                                                                                              and
                                                                                                ø(B) the Secretary and the non-Federal interest execute
                                                                                              a written agreement relating to operation and mainte-
                                                                                              nance of the improvements;
                                                                                           ø(2) the Secretary certifies that the project or separable ele-
                                                                                         ment of the project is constructed in accordance with applicable
                                                                                         permits and appropriate engineering and design standards;
                                                                                         and
                                                                                           ø(3) the Secretary does not find that the project or separable
                                                                                         element is no longer feasible.¿
                                                                                      (f) OPERATION AND MAINTENANCE.—
                                                                                           (1) ASSUMPTION OF MAINTENANCE.—Whenever a non-Federal
                                                                                         interest carries out improvements to a federally authorized har-
                                                                                         bor or inland harbor, the Secretary shall be responsible for op-
                                                                                         eration and maintenance in accordance with section 101(b) if—
                                                                                                (A) before construction of the improvements—




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                                     (i) the Secretary determines that the improvements
                                                                                                  are feasible and consistent with the purposes of this
                                                                                                  title; and




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00104   Fmt 6659   Sfmt 6603   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  105

                                                                                                      (ii) the Secretary and the non-Federal interest execute
                                                                                                    a written agreement relating to operation and mainte-
                                                                                                    nance of the improvements;
                                                                                                  (B) the Secretary certifies that the project or separable
                                                                                               element of the project is constructed in accordance with ap-
                                                                                               plicable permits and appropriate engineering and design
                                                                                               standards; and
                                                                                                  (C) the Secretary does not find that the project or sepa-
                                                                                               rable element is no longer feasible.
                                                                                            (2) FEDERAL FINANCIAL PARTICIPATION IN THE COSTS OF A LO-
                                                                                          CALLY PREFERRED PLAN.—In the case of improvements deter-
                                                                                          mined by the Secretary pursuant to paragraph (1)(A)(i) to devi-
                                                                                          ate from the national economic development plan, the Secretary
                                                                                          shall be responsible for all operation and maintenance costs of
                                                                                          such improvements, as described in section 101(b), including
                                                                                          costs in excess of the costs of the national economic development
                                                                                          plan, if the Secretary determines that the improvements satisfy
                                                                                          the requirements of paragraph (1).
                                                                                              *            *           *              *           *          *           *
                                                                                   SEC. 210. øAUTHORIZATION OF APPROPRIATIONS¿ FUNDING FOR
                                                                                              NAVIGATION.
                                                                                     (a) TRUST FUND.—There are authorized to be appropriated out of
                                                                                   the Harbor Maintenance Trust Fund, established by section 9505
                                                                                   of the Internal Revenue Code of 1954, for each fiscal year such
                                                                                   sums as may be necessary to pay—
                                                                                           (1) 100 percent of the eligible operations and maintenance
                                                                                         costs of those portions of the Saint Lawrence Seaway operated
                                                                                         and maintained by the Saint Lawrence Seaway Development
                                                                                         Corporation for such fiscal year; and
                                                                                           (2) up to 100 percent of the eligible operations and mainte-
                                                                                         nance costs assigned to commercial navigation of all harbors
                                                                                         and inland harbors within the United States.
                                                                                      (b) GENERAL FUND.—There are authorized to be appropriated out
                                                                                   of the general fund of the Treasury of the United States for each
                                                                                   fiscal year such sums as may be necessary to pay the balance of
                                                                                   all eligible operations and maintenance costs not provided by pay-
                                                                                   ments from the Harbor Maintenance Trust Fund under this sec-
                                                                                   tion.
                                                                                      (c) OPERATION AND MAINTENANCE OF HARBOR PROJECTS.—
                                                                                           ø(1) IN GENERAL.—To the maximum extent practicable, the
                                                                                         Secretary shall make expenditures to pay for operation and
                                                                                         maintenance costs of the harbors and inland harbors referred
                                                                                         to in subsection (a)(2), including expenditures of funds appro-
                                                                                         priated from the Harbor Maintenance Trust Fund, based on an
                                                                                         equitable allocation of funds among all such harbors and in-
                                                                                         land harbors.¿
                                                                                           (1) IN GENERAL.—For each fiscal year, of the funds made
                                                                                         available under this section (including funds appropriated from
                                                                                         the Harbor Maintenance Trust Fund), the Secretary shall make
                                                                                         expenditures to pay for operation and maintenance costs of the
                                                                                         harbors and inland harbors referred to in subsection (a)(2),




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                         using—
                                                                                                (A) not less than 20 percent of such funds for emerging
                                                                                              harbor projects, to the extent there are identifiable oper-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00105   Fmt 6659   Sfmt 6603   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  106

                                                                                              ations and maintenance needs, including eligible break-
                                                                                              water and jetty needs, at such harbor projects;
                                                                                                 (B) not less than 12 percent of such funds for projects
                                                                                              that are located within the Great Lakes Navigation System;
                                                                                                 (C) 10 percent of such funds for expanded uses carried
                                                                                              out at donor ports, as such term is defined in section 2106
                                                                                              of the Water Resources Reform and Development Act of
                                                                                              2014 (33 U.S.C. 2238c); and
                                                                                                 (D) any remaining funds for operation and maintenance
                                                                                              costs of any harbor or inland harbor referred to in sub-
                                                                                              section (a)(2) based on an equitable allocation of such funds
                                                                                              among such harbors and inland harbors.
                                                                                            (2) CRITERIA.—
                                                                                                 (A) IN GENERAL.—In determining an equitable allocation
                                                                                              of funds under paragraph (1), the Secretary shall—
                                                                                                      (i) consider the information obtained in the assess-
                                                                                                   ment conducted under subsection (e);
                                                                                                      (ii) consider the national and regional significance of
                                                                                                   harbor operations and maintenance; and
                                                                                                      (iii) as appropriate, consider national security and
                                                                                                   military readiness needs.
                                                                                                 (B) LIMITATION.—The Secretary shall not allocate funds
                                                                                              under paragraph (1) based solely on the tonnage transiting
                                                                                              through a harbor.
                                                                                            ø(3) EMERGING HARBOR PROJECTS.—Notwithstanding any
                                                                                          other provision of this subsection, in making expenditures
                                                                                          under paragraph (1) for each fiscal year, the Secretary shall al-
                                                                                          locate for operation and maintenance costs of emerging harbor
                                                                                          projects an amount that is not less than 10 percent of the
                                                                                          funds made available under this section for fiscal year 2012 to
                                                                                          pay the costs described in subsection (a)(2).¿
                                                                                            (3) ADDITIONAL USES AT EMERGING HARBORS.—
                                                                                                 (A) IN GENERAL.—In each fiscal year, the Secretary may
                                                                                              use not more than $5,000,000 of funds designated for
                                                                                              emerging harbor projects under paragraph (1)(A) to pay for
                                                                                              the costs of up to 10 projects for maintenance dredging of
                                                                                              a marina or berthing area, in an emerging harbor, that in-
                                                                                              cludes an area that is located adjacent to, or is accessible
                                                                                              by, a Federal navigation project, subject to subparagraphs
                                                                                              (B) and (C) of this paragraph.
                                                                                                 (B) ELIGIBLE EMERGING HARBORS.—The Secretary may
                                                                                              use funds as authorized under subparagraph (A) at an
                                                                                              emerging harbor that—
                                                                                                      (i) supports commercial activities, including commer-
                                                                                                   cial fishing operations, commercial fish processing op-
                                                                                                   erations, recreational and sport fishing, and commer-
                                                                                                   cial boat yards; or
                                                                                                      (ii) supports activities of the Secretary of the depart-
                                                                                                   ment in which the Coast Guard is operating.
                                                                                                 (C) COST-SHARING REQUIREMENTS.—The Secretary shall
                                                                                              require a non-Federal interest to contribute not less than 25
                                                                                              percent of the costs for maintenance dredging of that por-




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                              tion of a maintenance dredging project described in sub-
                                                                                              paragraph (A) that is located outside of the Federal naviga-
                                                                                              tion project, which may be provided as an in-kind contribu-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00106   Fmt 6659   Sfmt 6603   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  107

                                                                                              tion, including through the use of dredge equipment owned
                                                                                              by non-Federal interest to carry out such activities.
                                                                                            (4) MANAGEMENT OF GREAT LAKES NAVIGATION SYSTEM.—To
                                                                                         sustain effective and efficient operation and maintenance of
                                                                                         the Great Lakes Navigation System, including any navigation
                                                                                         feature in the Great Lakes that is a Federal responsibility with
                                                                                         respect to operation and maintenance, the Secretary shall
                                                                                         manage all of the individually authorized projects in the Great
                                                                                         Lakes Navigation System as components of a single, com-
                                                                                         prehensive system, recognizing the interdependence of the
                                                                                         projects.
                                                                                            (5) EMERGENCY EXPENDITURES.—Nothing in this subsection
                                                                                         prohibits the Secretary from making an expenditure to pay for
                                                                                         the operation and maintenance costs of a specific harbor or in-
                                                                                         land harbor, including the transfer of funding from the oper-
                                                                                         ation and maintenance of a separate project, if—
                                                                                                 (A) the Secretary determines that the action is necessary
                                                                                              to address the navigation needs of a harbor or inland har-
                                                                                              bor where safe navigation has been severely restricted due
                                                                                              to an unforeseen event; and
                                                                                                 (B) the Secretary provides within 90 days of the action
                                                                                              notice and information on the need for the action to the
                                                                                              Committee on Environment and Public Works and the
                                                                                              Committee on Appropriations of the Senate and the Com-
                                                                                              mittee on Transportation and Infrastructure and the Com-
                                                                                              mittee on Appropriations of the House of Representatives.
                                                                                       ø(d) PRIORITIZATION.—
                                                                                            ø(1) PRIORITY.—
                                                                                                 ø(A) IN GENERAL.—For each fiscal year, if priority funds
                                                                                              are available, the Secretary shall use at least 10 percent
                                                                                              of such funds for emerging harbor projects.
                                                                                                 ø(B) ADDITIONAL CONSIDERATIONS.—For each fiscal year,
                                                                                              of the priority funds available, the Secretary shall use—
                                                                                                      ø(i) not less than 5 percent of such funds for under-
                                                                                                   served harbor projects; and
                                                                                                      ø(ii) not less than 10 percent of such funds for
                                                                                                   projects that are located within the Great Lakes Navi-
                                                                                                   gation System.
                                                                                                 ø(C) UNDERSERVED HARBORS.—In determining which un-
                                                                                              derserved harbor projects shall receive funds under this
                                                                                              paragraph, the Secretary shall consider—
                                                                                                      ø(i) the total quantity of commerce supported by the
                                                                                                   water body on which the project is located; and
                                                                                                      ø(ii) the minimum width and depth that—
                                                                                                           ø(I) would be necessary at the underserved har-
                                                                                                        bor project to provide sufficient clearance for fully
                                                                                                        loaded commercial vessels using the underserved
                                                                                                        harbor project to maneuver safely; and
                                                                                                           ø(II) does not exceed the constructed width and
                                                                                                        depth of the authorized navigation project.
                                                                                            ø(2) EXPANDED USES.—
                                                                                                 ø(A) DEFINITION OF ELIGIBLE HARBOR OR INLAND HARBOR




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                              DEFINED.—In this paragraph, the term ‘‘eligible harbor or
                                                                                              inland harbor’’ means a harbor or inland harbor at which
                                                                                              the total amount of harbor maintenance taxes collected in




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00107   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  108

                                                                                              the immediately preceding 3 fiscal years exceeds the value
                                                                                              of the work carried out for the harbor or inland harbor
                                                                                              using amounts from the Harbor Maintenance Trust Fund
                                                                                              during those 3 fiscal years.
                                                                                                 ø(B) USE OF EXPANDED USES FUNDS.—
                                                                                                      ø(i) FISCAL YEARS 2015 THROUGH 2024.—For each of
                                                                                                   fiscal years 2015 through 2024, of the priority funds
                                                                                                   available, the Secretary shall use not less than 10 per-
                                                                                                   cent of such funds for expanded uses carried out at an
                                                                                                   eligible harbor or inland harbor.
                                                                                                      ø(ii) SUBSEQUENT FISCAL YEARS.—For fiscal year
                                                                                                   2025 and each fiscal year thereafter, the Secretary
                                                                                                   shall use not less than 10 percent of the priority funds
                                                                                                   available for expanded uses carried out at an eligible
                                                                                                   harbor or inland harbor.
                                                                                                 ø(C) PRIORITIZATION.—In allocating funds under this
                                                                                              paragraph, the Secretary shall give priority to projects at
                                                                                              eligible harbors or inland harbors for which the difference,
                                                                                              calculated in dollars, is greatest between—
                                                                                                      ø(i) the total amount of funding made available for
                                                                                                   projects at that eligible harbor or inland harbor from
                                                                                                   the Harbor Maintenance Trust Fund in the imme-
                                                                                                   diately preceding 3 fiscal years; and
                                                                                                      ø(ii) the total amount of harbor maintenance taxes
                                                                                                   collected at that harbor or inland harbor in the imme-
                                                                                                   diately preceding 3 fiscal years.
                                                                                            ø(3) REMAINING FUNDS.—
                                                                                                 ø(A) IN GENERAL.—For each of fiscal years 2015 through
                                                                                              2024, if after fully funding all projects eligible for funding
                                                                                              under paragraphs (1)(B) and (2)(B)(i), priority funds made
                                                                                              available under those paragraphs remain unobligated, the
                                                                                              Secretary shall use those remaining funds to pay for oper-
                                                                                              ation and maintenance costs of any harbor or inland har-
                                                                                              bor referred to in subsection (a)(2) based on an equitable
                                                                                              allocation of those funds among the harbors and inland
                                                                                              harbors.
                                                                                                 ø(B) CRITERIA.—In determining an equitable allocation
                                                                                              of funds under subparagraph (A), the Secretary shall—
                                                                                                      ø(i) use the criteria specified in subsection (c)(2)(A);
                                                                                                   and
                                                                                                      ø(ii) make amounts available in accordance with the
                                                                                                   requirements of paragraph (1)(A).
                                                                                            ø(4) EMERGENCY EXPENDITURES.—Nothing in this subsection
                                                                                          prohibits the Secretary from making an expenditure to pay for
                                                                                          the operation and maintenance costs of a specific harbor or in-
                                                                                          land harbor, including the transfer of funding from the oper-
                                                                                          ation and maintenance of a separate project, if—
                                                                                                 ø(A) the Secretary determines that the action is nec-
                                                                                              essary to address the navigation needs of a harbor or in-
                                                                                              land harbor where safe navigation has been severely re-
                                                                                              stricted due to an unforeseen event; and
                                                                                                 ø(B) the Secretary provides within 90 days of the action




rfrederick on DSKBCBPHB2PROD with HEARING
                                                                                              notice and information on the need for the action to the
                                                                                              Committee on Environment and Public Works and the
                                                                                              Committee on Appropriations of the Senate and the Com-




                                            VerDate Sep 11 2014   02:33 Jul 26, 2020   Jkt 099006   PO 00000   Frm 00108   Fmt 6659   Sfmt 6601   E:\HR\OC\HR460P1.XXX   HR460P1
                                                                                                                                  109

Full text truncated for size; the complete document is in the PDF above.

File and source

File
CRPT_crpt-116hrpt460_crpt-116hrpt460-pt1.pdf