Pandemic Darlings The pandemic economy, in original documents
Home Source documents Water Resources Development Act of 2020 and H.R. 6395 — Congressional Record, House

Water Resources Development Act of 2020 and H.R. 6395 — Congressional Record, House

Summary

Page H6935 of the Congressional Record, House, for December 8, 2020, begins with remarks on the conference report for H.R. 6395, the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021. Bonamici rises in opposition to the Conference Report, and Luetkemeyer speaks about a section on international bank records. A communication from the Clerk of the House reports that the Senate agreed to S. Res. 795 on the death of a former United States Senator for the State of Iowa. The page also takes up S. 1014 to establish the Route 66 Centennial Commission and includes remarks and a section list for the Water Resources Development Act of 2020 (WRDA 2020), with a vote on the conference report postponed.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Water Resources Development Act of 2020 and H.R. 6395 — Congressional Record, House.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/crec-crec-2020-12-08-crec-2020-12-08-pt1-pgh6935-3-0458aac384/, SHA-256 a45a4128deec9481a97ccea67c37b7ca9bc83aca1f598015a7ece352668d8f32.

Full text

                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6935
                                              intent of H.R. 2617 has been fully accom-               the William M. (Mac) Thornberry National De-               COMMUNICATION FROM THE
                                              plished through the NDAA as last year’s FY20            fense Authorization Act for Fiscal Year 2021.                 CLERK OF THE HOUSE
                                              NDAA required DoD to input any OEH haz-                 This bill contains many important provisions             The SPEAKER pro tempore laid be-
                                              ards exposure into servicemembers’ records              that should become law, but unfortunately              fore the House the following commu-
                                              while deployed so it is tracked throughout their        those laudable policies are outweighed by the          nication from the Clerk of the House of
                                              career and into veteran status.                         staggering cost and I cannot support the bill          Representatives:
                                                 Overall, I am proud of the Readiness Sub-            as a whole.                                                           OFFICE OF THE CLERK,
                                              committee’s contribution to this year’s bill and           I am grateful for the Conferees’ work to in-                    HOUSE OF REPRESENTATIVES,
                                              would like to thank the Readiness staff, Brian          clude language increasing treatment and ben-                      Washington, DC, December 8, 2020.
                                              Garrett, Jeanine Womble, Melanie Harris, Jay            efits for veterans by expanding the types of           Hon. NANCY PELOSI,
                                              Vallario, John Muller, Dave Sienicki, and Sean          diseases that are presumed connected with              The Speaker, House of Representatives,
                                              Falvey, and my personal staff, Betsy Thomp-             exposure to Agent Orange. I also strongly              Washington, DC.
                                              son, Marcus Jones, and Danusia Hubah, for               support the pay increase for our troops, the             DEAR MADAM SPEAKER: Pursuant to the
                                              their tireless work. Marcus and Danusia will be         removal of names and symbols associated                permission granted in Clause 2(h) of Rule II
                                                                                                                                                             of the Rules of the U.S. House of Representa-
                                              departing the Hill after next week, and I would         with the racist legacy of the Confederacy, and         tives, the Clerk received the following mes-
                                              like to personally thank them for their hard            the bolstering of paid parental leave policies         sage from the Secretary of the Senate on De-
                                              work and sharing their expertise with us this           across the federal government. I commend               cember 8, 2020, at 11:44 a.m.:
                                              past year. Both Marcus and Danusia have                 Chairman SMITH for his ongoing work to ad-               That the Senate agreed to Relative to the
                                              been invaluable members of my staff and we              vance legislation that improves the military’s         death of the Honorable Roger William Jep-
                                              will miss them dearly.                                  prevention of sexual assault and support for           sen, former United States Senator for the
                                                 This bill helps advance our military’s near-         survivors, takes encouraging steps to address          State of Iowa S. Res. 795.
                                              term readiness goals and drives the Depart-             climate change, and prevents the misuse of               That the Senate passed with an amend-
                                              ment to plan for and take action against long-                                                                 ment H.R. 1503.
                                                                                                      taxpayer money on a wasteful border wall. In             That the Senate passed without amend-
                                              term threats. The conference report also au-            response to authoritarian tactics by federal           ment H.R. 4761.
                                              thorizes funding that will strengthen DOD and           agents in Portland, Oregon, and elsewhere,               That the Senate passed with amendments
                                              the country’s ability to respond to potential           the Chairman and House Conferees also                  H.R. 5273.
                                              COVID–19 resurgence and other infectious                achieved bipartisan support for a policy I               With best wishes, I am
                                              diseases in the future. With that, I urge my            championed requiring that any federal forces                 Sincerely,
                                              colleagues to support the FY21 NDAA.                    responding to a protest or civil disturbance by                             CHERYL L. JOHNSON,
                                                 Mr. LUETKEMEYER. Mr. Speaker, section                                                                                                              Clerk.
                                                                                                      clearly identifiable.
                                              6308 enhances U.S. law enforcement’s ability               I cannot ignore, however, the unprece-                              f
                                              to access international bank records to help            dented amount of military spending that this           ANNOUNCEMENT BY THE SPEAKER
                                              better ensure financial crimes are investigated.        legislation would authorize. Amid a national                      PRO TEMPORE
                                              I am supportive of this new and necessary               crisis precipitated by a global pandemic, voting
                                              provision. This new authority allows the De-                                                                     The SPEAKER pro tempore (Ms.
                                                                                                      to allow billions of dollars to be spent on            MCCOLLUM). Pursuant to clause 8 of
                                              partments of Treasury and Justice to issue              weapons is unjustifiable when our commu-
                                              subpoenas requiring production of records re-                                                                  rule XX, the Chair will postpone fur-
                                                                                                      nities desperately need food and housing se-           ther proceedings today on motions to
                                              lating to accounts held by banks outside of the         curity, access to childcare, affordable health
                                              United States. This new authority would create                                                                 suspend the rules on which the yeas
                                                                                                      care, and small business support. We must              and nays are ordered.
                                              a secondary mechanism for seeking discovery             not accept the notion that annual increases in
                                              from foreign banks separate from the Mutual                                                                      The House will resume proceedings
                                                                                                      defense spending are somehow inevitable and            on postponed questions at a later time.
                                              Legal Assistance Treaties (‘‘MLATs’’) or other          can be rationalized as modest when adding
                                              multilateral or bilateral agreements the United                                                                                  f
                                                                                                      just one percent costs billions of dollars that
                                              States currently maintains with many foreign            should instead be invested domestically in                       WATER RESOURCES
                                              governments for this purpose. As the Depart-            schools or infrastructure.                                  DEVELOPMENT ACT OF 2020
                                              ments of Justice and Treasury implement Sec-               I do not take this vote lightly and my com-           Mr. DEFAZIO. Madam Speaker, I
                                              tion 6308, I encourage them only to use this            mitment to providing for our servicemembers            move to suspend the rules and pass the
                                              new authority where a foreign bank operates             remains steadfast. It is a complex and chal-           bill (S. 1811) to make technical correc-
                                              in a jurisdiction as to which no MLAT or other          lenging task to responsibly fund our national          tions to the America’s Water Infra-
                                              information-sharing agreement exists or where           defense, but I am confident that we can main-          structure Act of 2018, and for other pur-
                                              the relevant foreign government has not satis-          tain adequate security while reining in the im-        poses, as amended.
                                              fied its obligations under an MLAT or other in-         mense and ever-increasing sums that end-                 The Clerk read the title of the bill.
                                              formation-sharing agreement.                            lessly pour into the military-industrial complex.
                                                 Many foreign countries restrict banks oper-                                                                   The text of the bill is as follows:
                                                                                                      I look forward to continued engagement with                                 S. 1811
                                              ating in their jurisdictions from sharing their         my colleagues as we address these difficult
                                              customers’ financial or personally identifiable                                                                  Be it enacted by the Senate and House of Rep-
                                                                                                      issues.                                                resentatives of the United States of America in
                                              information (‘‘PII’). As a result, subpoenas
                                                                                                                                                             Congress assembled,
                                              issued under section 6308 may place foreign
                                                                                                                       b 1400                                SECTION 1. SHORT TITLE; TABLE OF CONTENTS.
                                              banks in the difficult position of either violating
                                                                                                        The SPEAKER pro tempore. All time                      (a) SHORT TITLE.—This Act may be cited as
                                              home country law or being in contempt for fail-                                                                the ‘‘Water Resources Development Act of
                                              ure to comply with a subpoena issued by the             for debate has expired.                                2020’’.
                                              United States government. As a result, I be-              Pursuant to the order of the House of                  (b) TABLE OF CONTENTS.—The table of con-
                                              lieve it is appropriate for the Departments of          Thursday, December 3, 2020, the pre-                   tents for this Act is as follows:
                                              Justice and Treasury to take into consideration         vious question is ordered.                             Sec. 1. Short title; table of contents.
                                              conflict of laws situations to achieve the pur-           The question is on the adoption of                   Sec. 2. Secretary defined.
                                              poses of Section 6308 while also maintaining            the conference report.                                       TITLE I—GENERAL PROVISIONS
                                              a respect for home country requirements.                  The question was taken; and the                      Sec. 101. Budgetary treatment expansion
                                                 Finally, I encourage the Departments of              Speaker pro tempore announced that                                   and adjustment for the Harbor
                                              Treasury and Justice to issue regulations es-           the ayes appeared to have it.                                        Maintenance Trust Fund.
                                              tablishing appropriate protocols to ensure that           Mr. SMITH of Washington. Mr.                         Sec. 102. Authorization of appropriations for
                                              the authority granted under section 6308 does           Speaker, on that I demand the yeas                                   navigation.




SSpencer on DSK126QN23PROD with HOUSE
                                              not supersede or supplant existing MLATs or             and nays.                                              Sec. 103. Annual report to Congress on the
                                              other multilateral or bilateral agreements be-            The SPEAKER pro tempore. Pursu-                                    Harbor      Maintenance    Trust
                                                                                                                                                                           Fund.
                                              tween the United States and the relevant for-           ant to section 3 of House Resolution
                                                                                                                                                             Sec. 104. Additional measures at donor ports
                                              eign government that are available for obtain-          965, the yeas and nays are ordered.                                  and energy transfer ports.
                                              ing records from a foreign bank.                          Pursuant to clause 8 of rule XX, fur-                Sec. 105. Construction of water resources de-
                                                 Ms. BONAMICI. Mr. Speaker, I rise in oppo-           ther proceedings on this question are                                velopment projects by non-Fed-
                                              sition to the Conference Report for H.R. 6395,          postponed.                                                           eral interests.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00029   Fmt 4634   Sfmt 0655   E:\CR\FM\A08DE7.012   H08DEPT1
                                              H6936                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                              Sec. 106. Coast Guard anchorages.                       Sec. 156. Planning Assistance to States.               Sec. 303. Tribal partnership program.
                                              Sec. 107. State contribution of funds for cer-          Sec. 157. Forecast-informed reservoir oper-            Sec. 304. Lakes program.
                                                            tain operation and maintenance                          ations.                                  Sec. 305. Rehabilitation of Corps of Engi-
                                                            costs.                                    Sec. 158. Data for water allocation, supply,                         neers constructed dams.
                                              Sec. 108. Great Lakes confined disposal fa-                           and demand.                              Sec. 306. Chesapeake Bay Environmental
                                                            cilities.                                 Sec. 159. Inland waterways pilot program.                            Restoration     and   Protection
                                              Sec. 109. Inland waterway projects.                     Sec. 160. Definition of economically dis-                            Program.
                                              Sec. 110. Implementation of water resources                           advantaged community.                    Sec. 307. Upper Mississippi River System En-
                                                            principles and requirements.              Sec. 161. Studies of water resources develop-                        vironmental Management Pro-
                                              Sec. 111. Resiliency planning assistance.                             ment projects by non-Federal                           gram.
                                              Sec. 112. Project consultation.                                       interests.                               Sec. 308. Upper Mississippi River protection.
                                              Sec. 113. Review of resiliency assessments.             Sec. 162. Leveraging Federal infrastructure            Sec. 309. Theodore Ship Channel, Mobile,
                                              Sec. 114. Small flood control projects.                               for increased water supply.                            Alabama.
                                              Sec. 115. Flood Protection Projects.                    Sec. 163. Sense of Congress on removal of              Sec. 310. McClellan-Kerr Arkansas River
                                              Sec. 116. Feasibility studies; review of nat-                         unauthorized, manmade, flam-                           Navigation System.
                                                            ural and nature-based features.                         mable materials on Corps prop-           Sec. 311. Ouachita and Black Rivers, Arkan-
                                              Sec. 117. Federal interest determination.                             erty.                                                  sas and Louisiana.
                                              Sec. 118. Pilot programs on the formulation             Sec. 164. Enhanced development program.                Sec. 312. Lake Isabella, California.
                                                            of Corps of Engineers projects            Sec. 165. Continuing authority programs.               Sec. 313. Lower San Joaquin River flood con-
                                                            in rural communities and eco-                 TITLE II—STUDIES AND REPORTS                                     trol project.
                                                            nomically disadvantaged com-                                                                     Sec. 314. Sacramento River, Glenn-Colusa,
                                                                                                      Sec. 201. Authorization of proposed feasi-                           California.
                                                            munities.
                                                                                                                    bility studies.                          Sec. 315. San Diego River and Mission Bay,
                                              Sec. 119. Permanent measures to reduce
                                                                                                      Sec. 202. Expedited completions.                                     San Diego County, California.
                                                            emergency flood fighting needs
                                                                                                      Sec. 203. Expedited modifications of existing          Sec. 316. San Francisco, California, Water-
                                                            for communities subject to re-
                                                                                                                    feasibility studies.                                   front Area.
                                                            petitive flooding.
                                                                                                      Sec. 204. Assistance to non-Federal sponsors;          Sec. 317. Western Pacific Interceptor Canal,
                                              Sec. 120. Emergency response to natural dis-
                                                                                                                    feasibility analysis.                                  Sacramento River, California.
                                                            asters.
                                                                                                      Sec. 205. Selma, Alabama.                              Sec. 318. Rio Grande Environmental Man-
                                              Sec. 121. Cost and benefit feasibility assess-          Sec. 206. Report on Corps of Engineers facili-
                                                            ment.                                                                                                          agement Program, Colorado,
                                                                                                                    ties in Appalachia.                                    New Mexico, and Texas.
                                              Sec. 122. Expediting repairs and recovery               Sec. 207. Additional studies under North At-
                                                            from flooding.                                                                                   Sec. 319. New London Harbor Waterfront
                                                                                                                    lantic Coast Comprehensive                             Channel, Connecticut.
                                              Sec. 123. Review of Corps of Engineers as-                            Study.
                                                            sets.                                                                                            Sec. 320. Wilmington Harbor, Delaware.
                                                                                                      Sec. 208. South Atlantic coastal study.                Sec. 321. Wilmington Harbor South Disposal
                                              Sec. 124. Sense of Congress on multipurpose             Sec. 209. Comprehensive study of the Sac-
                                                            projects.                                                                                                      Area, Delaware.
                                                                                                                    ramento River, Yolo Bypass,              Sec. 322. Washington Harbor, District of Co-
                                              Sec. 125. Beneficial use of dredged material;                         California.
                                                            dredged material management                                                                                    lumbia.
                                                                                                      Sec. 210. Lake Okeechobee regulation sched-            Sec. 323. Big Cypress Seminole Indian Res-
                                                            plans.                                                  ule, Florida.
                                              Sec. 126. Aquatic ecosystem restoration for                                                                                  ervation Water Conservation
                                                                                                      Sec. 211. Great Lakes coastal resiliency                             Plan, Florida.
                                                            anadromous fish.                                        study.
                                              Sec. 127. Annual report to Congress on water                                                                   Sec. 324. Central Everglades, Florida.
                                                                                                      Sec. 212. Report on the status of restoration          Sec. 325. Miami River, Florida.
                                                            resources infrastructure.                               in the Louisiana coastal area.           Sec. 326. Julian Keen, Jr. Lock and Dam,
                                              Sec. 128. Harmful algal bloom demonstra-                Sec. 213. Lower Mississippi River com-                               Moore Haven, Florida.
                                                            tion program.                                           prehensive management study.             Sec. 327. Taylor Creek Reservoir and Levee
                                              Sec. 129. Missouri River interception-rearing           Sec. 214. Upper Mississippi River Com-                               L–73 (Section 1), Upper St.
                                                            complex construction.                                   prehensive Plan.                                       Johns River Basin, Florida.
                                              Sec. 130. Materials, services, and funds for            Sec. 215. Upper      Missouri    River   Basin         Sec. 328. Extinguishment of flowage ease-
                                                            repair, restoration, or rehabili-                       mainstem dam fish loss re-                             ments, Rough River Lake, Ken-
                                                            tation of projects.                                     search.                                                tucky.
                                              Sec. 131. Levee safety.                                 Sec. 216. Lower and Upper Missouri River               Sec. 329. Calcasieu River and Pass, Lou-
                                              Sec. 132. National Dam Safety Program.                                Comprehensive Flood Protec-                            isiana.
                                              Sec. 133. Rehabilitation of Corps of Engi-                            tion.                                    Sec. 330. Camden Harbor, Maine.
                                                            neers constructed pump sta-               Sec. 217. Portsmouth Harbor and Piscataqua             Sec. 331. Cape Porpoise Harbor, Maine, an-
                                                            tions.                                                  River and Rye Harbor, New                              chorage area designation.
                                              Sec. 134. Non-Federal Project Implementa-                             Hampshire.                               Sec. 332. Baltimore, Maryland.
                                                            tion Pilot Program.                       Sec. 218. Cougar and Detroit Dams, Willam-             Sec. 333. Thad Cochran Lock and Dam,
                                              Sec. 135. Cost sharing provisions for terri-                          ette River Basin, Oregon.                              Amory, Mississippi.
                                                            tories and Indian Tribes.                 Sec. 219. Port Orford, Oregon.                         Sec. 334. Missouri river reservoir sediment
                                              Sec. 136. Review of contracting policies.               Sec. 220. Wilson Creek and Sloan Creek,                              management.
                                              Sec. 137. Criteria for funding environmental                          Fairview, Texas.                         Sec. 335. Portsmouth, New Hampshire.
                                                            infrastructure projects.                  Sec. 221. Study on water supply and water              Sec. 336. Rahway flood risk management
                                              Sec. 138. Aging infrastructure.                                       conservation at water resources                        feasibility study, New Jersey.
                                              Sec. 139. Uniformity of notification systems.                                                                  Sec. 337. San Juan-Chama project; Abiquiu
                                                                                                                    development projects.
                                              Sec. 140. Coastal storm damage reduction                                                                                     Dam, New Mexico.
                                                                                                      Sec. 222. Report to Congress on authorized
                                                            contracts.                                                                                       Sec. 338. Flushing Bay and Creek Federal
                                                                                                                    studies and projects.
                                              Sec. 141. Dam remediation for ecosystem                                                                                      Navigation Channel, New York.
                                                                                                      Sec. 223. Completion of reports and mate-
                                                            restoration.                                                                                     Sec. 339. Rush River and Lower Branch Rush
                                                                                                                    rials.
                                              Sec. 142. Levee accreditation process; levee                                                                                 River, North Dakota.
                                                                                                      Sec. 224. Emergency flooding protection for
                                                            certifications.                                                                                  Sec. 340. Pawcatuck River, Little Narragan-
                                                                                                                    lakes.
                                              Sec. 143. Project partnership agreement.                                                                                     sett Bay and Watch Hill Cove,
                                                                                                      Sec. 225. Report on debris removal.
                                              Sec. 144. Acceptance of funds for harbor                                                                                     Rhode Island and Connecticut.
                                                                                                      Sec. 226. Report on antecedent hydrologic
                                                            dredging.                                                                                        Sec. 341. Harris County, Texas.
                                                                                                                    conditions.
                                              Sec. 145. Replacement capacity.                                                                                Sec. 342. Cap Sante Waterway, Washington.
                                                                                                      Sec. 227. Subsurface drain systems research
                                              Sec. 146. Reviewing hydropower at Corps of                                                                     Sec. 343. Local government reservoir permit
                                                                                                                    and development.
                                                            Engineers facilities.                                                                                          review.
                                                                                                      Sec. 228. Report on corrosion prevention ac-
                                              Sec. 147. Repair and restoration of embank-                                                                    Sec. 344. Project modifications for improve-
                                                                                                                    tivities.
                                                            ments.                                                                                                         ment of environment.
                                                                                                      Sec. 229. Annual reporting on dissemination
                                              Sec. 148. Coastal mapping.                                                                                     Sec. 345. Aquatic ecosystem restoration.
                                                                                                                    of information.
                                              Sec. 149. Interim risk reduction measures.                                                                     Sec. 346. Surplus water contracts and water




SSpencer on DSK126QN23PROD with HOUSE
                                                                                                      Sec. 230. Report on benefits calculation for
                                              Sec. 150. Maintenance dredging permits.                                                                                      storage agreements.
                                                                                                                    flood control structures.
                                              Sec. 151. High water-low water preparedness.                                                                   Sec. 347. No wake zones in navigation chan-
                                              Sec. 152. Treatment of certain benefits and               TITLE III—DEAUTHORIZATIONS AND                                     nels.
                                                            costs.                                                   MODIFICATIONS                           Sec. 348. Limitation on contract execution
                                              Sec. 153. Lease deviations.                             Sec. 301. Deauthorization       of     inactive                      in the Arkansas River Basin.
                                              Sec. 154. Sense of Congress on Arctic deep                            projects.                                Sec. 349. Waiver of non-Federal share of
                                                            draft port development.                   Sec. 302. Abandoned and inactive noncoal                             damages related to certain con-
                                              Sec. 155. Small water storage projects.                               mine restoration.                                      tract claims.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00030   Fmt 4634   Sfmt 0655   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6937
                                              Sec. 350. Reduced pricing for certain water               ‘‘ ‘(ii) $2,000,000,000.                               (3) EFFECTIVE DATE.—This subsection shall
                                                            supply storage.                             ‘‘ ‘(I) CERTAIN HARBOR MAINTENANCE ACTIVI-           take effect on October 1, 2022.
                                              Sec. 351. Flood control and other purposes.             TIES.—If, for any of fiscal years 2021 through           (b) ADDITIONAL USES.—
                                              Sec. 352. Additional assistance for critical            2030, appropriations for the Operation and               (1) OPERATION AND MAINTENANCE OF HARBOR
                                                            projects.                                 Maintenance account of the Corps of Engi-              PROJECTS.—Section 210(c)(3) of the Water Re-
                                              Sec. 353. Project modification authoriza-               neers are enacted that the Congress des-               sources Development Act of 1986 (33 U.S.C.
                                                            tions.                                    ignates in statute as being to carry out sub-          2238(c)(3)) is amended—
                                              Sec. 354. Completion of maintenance and re-             section (c) of section 2106 of the Water Re-             (A) by striking ‘‘Notwithstanding’’ and in-
                                                            pair activities.                          sources Reform and Development Act of 2014             serting the following:
                                              Sec. 355. Project reauthorizations.                     (33 U.S.C. 2238c), then the adjustment for               ‘‘(A) ALLOCATION.—Notwithstanding’’; and
                                              Sec. 356. Conveyances.                                  that fiscal year shall be the total of such ap-          (B) by adding at the end the following:
                                              Sec. 357. Lake Eufaula advisory committee.              propriations for that fiscal year designated             ‘‘(B) ADDITIONAL USES AT EMERGING HAR-
                                              Sec. 358. Repeal of Missouri River Task                 as being to carry out such subsection, but             BORS.—
                                                            Force, North Dakota.                      shall not exceed—                                        ‘‘(i) USES.—In each fiscal year, the Sec-
                                              Sec. 359. Repeal of Missouri River Task                   ‘‘ ‘(i) $50,000,000 for fiscal year 2021;            retary may use not more than $5,000,000 of
                                                            Force, South Dakota.                        ‘‘ ‘(ii) $50,000,000 for fiscal year 2022;           funds allocated for emerging harbor projects
                                              Sec. 360. Conforming amendments.                          ‘‘ ‘(iii) $56,000,000 for fiscal year 2023;          under paragraph (1) to pay for the costs of up
                                                    TITLE IV—WATER RESOURCES                            ‘‘ ‘(iv) $58,000,000 for fiscal year 2024;           to 10 projects for maintenance dredging of a
                                                           INFRASTRUCTURE                               ‘‘ ‘(v) $60,000,000 for fiscal year 2025;            marina or berthing area, in an emerging har-
                                              Sec. 401. Project authorizations.                         ‘‘ ‘(vi) $62,000,000 for fiscal year 2026;           bor, that includes an area that is located ad-
                                              Sec. 402. Special rules.                                  ‘‘ ‘(vii) $64,000,000 for fiscal year 2027;          jacent to, or is accessible by, a Federal navi-
                                              Sec. 403. Authorization of projects based on              ‘‘ ‘(viii) $66,000,000 for fiscal year 2028;         gation project, subject to clauses (ii) and (iii)
                                                            feasibility studies prepared by             ‘‘ ‘(ix) $68,000,000 for fiscal year 2029; and       of this subparagraph.
                                                            non-Federal interests.                      ‘‘ ‘(x) $70,000,000 for fiscal year 2030.’.’’.         ‘‘(ii) ELIGIBLE EMERGING HARBORS.—The
                                                                                                        (b) EFFECTIVE DATE.—The amendment                    Secretary may use funds as authorized under
                                                      TITLE V—OTHER MATTERS
                                                                                                      made by subsection (a) shall take effect as if         clause (i) at an emerging harbor that—
                                              Sec. 501. Update on Invasive Species Policy             included in the enactment of the CARES Act               ‘‘(I) supports commercial activities, in-
                                                            Guidance.                                 (Public Law 116–136).                                  cluding commercial fishing operations, com-
                                              Sec. 502. Aquatic invasive species research.            SEC. 102. AUTHORIZATION OF APPROPRIATIONS              mercial fish processing operations, rec-
                                              Sec. 503. Terrestrial noxious weed control                          FOR NAVIGATION.                            reational and sport fishing, and commercial
                                                            pilot program.
                                                                                                         (a) AUTHORIZATION.—                                 boat yards; or
                                              Sec. 504. Invasive species risk assessment,
                                                                                                         (1) IN GENERAL.—In carrying out subsection            ‘‘(II) supports activities of the Secretary of
                                                            prioritization,   and   manage-
                                                                                                      (c) of section 210 of the Water Resources De-          the department in which the Coast Guard is
                                                            ment.
                                                                                                      velopment Act of 1986 (33 U.S.C. 2238), for            operating.
                                              Sec. 505. Invasive species mitigation and re-
                                                                                                      each fiscal year, of the funds made available            ‘‘(iii) COST-SHARING REQUIREMENTS.—The
                                                            duction.
                                                                                                      under such section (including funds appro-             Secretary shall require a non-Federal inter-
                                              Sec. 506. Aquatic invasive species preven-
                                                                                                      priated from the Harbor Maintenance Trust              est to contribute not less than 25 percent of
                                                            tion.
                                                                                                      Fund), the Secretary is authorized to make             the costs for maintenance dredging of that
                                              Sec. 507. Invasive species in alpine lakes
                                                                                                      expenditures to pay for operation and main-            portion of a maintenance dredging project
                                                            pilot program.
                                                                                                      tenance costs of the harbors and inland har-           described in clause (i) that is located outside
                                              Sec. 508. Murder hornet eradication pilot
                                                                                                      bors referred to in subsection (a)(2) of such          of the Federal navigation project, which may
                                                            program.
                                                                                                      section, to the extent there are identifiable          be provided as an in-kind contribution, in-
                                              Sec. 509. Asian carp prevention and control
                                                                                                      operations and maintenance needs, of—                  cluding through the use of dredge equipment
                                                            pilot program.
                                                                                                         (A) not less than 15 percent of such funds          owned by non-Federal interest to carry out
                                              Sec. 510. Invasive species in noncontiguous
                                                                                                      for emerging harbor projects, including eligi-         such activities.’’.
                                                            States and territories pilot pro-
                                                                                                      ble breakwater and jetty needs at such har-              (2) ASSESSMENT OF HARBORS AND INLAND
                                                            gram.
                                                                                                      bor projects;                                          HARBORS.—Section        210(e)(2)(A)(ii) of the
                                              Sec. 511. Soil moisture and snowpack moni-
                                                            toring.                                      (B) not less than 13 percent of such funds          Water Resources Development Act of 1986 (33
                                              Sec. 512. Great Lakes St. Lawrence Seaway               for projects that are located within the               U.S.C. 2238(e)(2)(A)(ii)) is amended by insert-
                                                            Development Corporation.                  Great Lakes Navigation System;                         ing ‘‘uses described in subsection (c)(3)(B)
                                              Sec. 513. Determination of budgetary ef-                   (C) 12 percent of such funds for expanded           and’’ after ‘‘costs for’’.
                                                            fects.                                    uses carried out at donor ports and energy               (3) DEFINITIONS.—Section 210(f) of the
                                                                                                      transfer ports, of which—                              Water Resources Development Act of 1986 (33
                                              SEC. 2. SECRETARY DEFINED.
                                                                                                         (i) 1⁄3 shall be provided to energy transfer        U.S.C. 2238(f)) is amended—
                                                In this Act, the term ‘‘Secretary’’ means             ports; and                                               (A) by striking paragraph (6);
                                              the Secretary of the Army.                                 (ii) 2⁄3 shall be provided to donor ports;            (B) by redesignating paragraphs (3)
                                                    TITLE I—GENERAL PROVISIONS                           (D) not less than 17 percent of such funds          through (5) as paragraphs (4) through (6), re-
                                              SEC. 101. BUDGETARY TREATMENT EXPANSION                 for projects that are assigned to commercial           spectively;
                                                         AND ADJUSTMENT FOR THE HAR-                  strategic seaports; and                                  (C) by striking paragraph (2) and inserting
                                                         BOR MAINTENANCE TRUST FUND.                     (E) any remaining funds for operation and           the following:
                                                (a) IN GENERAL.—Section 14003 of division             maintenance costs of any harbor or inland                ‘‘(2) EMERGING HARBOR.—The term ‘emerg-
                                              B of the CARES Act (Public Law 116–136) is              harbor referred to in such subsection (a)(2)           ing harbor’ means a harbor or inland harbor
                                              amended to read as follows:                             based on an equitable allocation of such               referred to in subsection (a)(2) that transits
                                                ‘‘SEC. 14003. Section 251(b)(2) of the Bal-           funds among such harbors and inland har-               less than 1,000,000 tons of cargo annually.
                                              anced Budget and Emergency Deficit Control              bors, in accordance with subsection (c)(1) of            ‘‘(3) EMERGING HARBOR PROJECT.—The term
                                              Act of 1985 (2 U.S.C. 901(b)(2)) is amended by          such section 210.                                      ‘emerging harbor project’ means a project
                                              adding at the end the following:                           (2) DEFINITIONS.—In this subsection:                that is assigned to an emerging harbor.’’;
                                                ‘‘ ‘(H) HARBOR MAINTENANCE ACTIVITIES.—If,               (A) COMMERCIAL STRATEGIC SEAPORT.—The               and
                                              for any fiscal year, appropriations for the             term ‘‘commercial strategic seaport’’ means              (D) in paragraph (4) (as so redesignated), by
                                              Construction, Mississippi River and Tribu-              a commercial harbor supporting the coordi-             adding at the end the following:
                                              taries, and Operation and Maintenance ac-               nation of efficient port operations during               ‘‘(C) An in-water improvement, if the im-
                                              counts of the Corps of Engineers are enacted            peacetime and national defense emergencies             provement—
                                              that are derived from the Harbor Mainte-                that is designated as strategic through the              ‘‘(i) is for the seismic reinforcement of a
                                              nance Trust Fund established under section              National Port Readiness Network.                       wharf or other berthing structure, or the re-
                                              9505(a) of the Internal Revenue Code of 1986               (B) DONOR PORT; ENERGY TRANSFER PORT.—              pair or replacement of a deteriorating wharf
                                              and that the Congress designates in statute             The terms ‘‘donor port’’ and ‘‘energy transfer         or other berthing structure, at a port facil-
                                              as being for harbor operations and mainte-              port’’ have the meanings given those terms             ity;
                                              nance activities, then the adjustment for               in section 2106 of the Water Resources Re-               ‘‘(ii) benefits commercial navigation at the
                                              that fiscal year shall be the total of such ap-         form and Development Act of 2014 (33 U.S.C.            harbor; and




SSpencer on DSK126QN23PROD with HOUSE
                                              propriations that are derived from such Fund            2238c).                                                  ‘‘(iii) is located in, or adjacent to, a berth
                                              and designated as being for harbor oper-                   (C) EMERGING HARBOR PROJECT; GREAT                  that is accessible to a Federal navigation
                                              ations and maintenance activities, but shall            LAKES        NAVIGATION    SYSTEM.—The      terms      project.
                                              not exceed the sum of—                                  ‘‘emerging harbor project’’ and ‘‘Great Lakes            ‘‘(D) An activity to maintain slope sta-
                                                ‘‘ ‘(i) the amount deposited into the Harbor          Navigation System’’ have the meanings                  bility at a berth in a harbor that is acces-
                                              Maintenance Trust Fund in the fiscal year               given those terms in section 210 of the Water          sible to a Federal navigation project if such
                                              that is two years prior to the fiscal year for          Resources Development Act of 1986 (33 U.S.C.           activity benefits commercial navigation at
                                              which the adjustment is being made; and                 2238).                                                 the harbor.’’.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00031   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6938                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              SEC. 103. ANNUAL REPORT TO CONGRESS ON THE                (2) REPORT TO CONGRESS; AUTHORIZATION OF               (4) documents relating to any applicable
                                                          HARBOR    MAINTENANCE    TRUST              APPROPRIATIONS.—Section 2106 of the Water              permits required for the project improve-
                                                          FUND.                                       Resources Reform and Development Act of                ments.
                                                Section 330 of the Water Resources Devel-             2014 (33 U.S.C. 2238c) is amended—                       (d) PROJECT STUDIES SUBJECT TO INDE-
                                              opment Act of 1992 (26 U.S.C. 9505 note; 106              (A) by striking subsection (e) and redesig-          PENDENT PEER REVIEW.—The Secretary shall
                                              Stat. 4851) is amended—                                 nating subsections (f) and (g) as subsections          not be required to subject a project study for
                                                (1) in subsection (a)—                                (e) and (f), respectively; and                         a project with a cost of less than $200,000,000,
                                                (A) by striking ‘‘and annually thereafter,’’            (B) in subsection (e), as so redesignated, by        which the Secretary determines satisfies the
                                              and inserting ‘‘and annually thereafter con-            amending paragraph (1) to read as follows:             requirements of section 204(f)(1) of the Water
                                              current with the submission of the Presi-                 ‘‘(1) IN GENERAL.—There are authorized to            Resources Development Act of 1986 (33 U.S.C.
                                              dent’s annual budget request to Congress,’’;            be appropriated to carry out this section—             2232), to independent peer review under sec-
                                              and                                                       ‘‘(A) $56,000,000 for fiscal year 2023;              tion 2034(a)(3)(A)(i) of the Water Resources
                                                (B) by striking ‘‘Public Works and Trans-               ‘‘(B) $58,000,000 for fiscal year 2024;              Development Act of 2007 (33 U.S.C.
                                              portation’’ and inserting ‘‘Transportation                ‘‘(C) $60,000,000 for fiscal year 2025;              2343(a)(3)(A)(i)).
                                              and Infrastructure’’; and                                 ‘‘(D) $62,000,000 for fiscal year 2026;              SEC. 106. COAST GUARD ANCHORAGES.
                                                (2) in subsection (b)(1) by adding at the end           ‘‘(E) $64,000,000 for fiscal year 2027;                The Secretary may perform dredging at
                                              the following:                                            ‘‘(F) $66,000,000 for fiscal year 2028;              Federal expense within and adjacent to an-
                                                ‘‘(D) A description of the expected expendi-            ‘‘(G) $68,000,000 for fiscal year 2029; and          chorages established by the Coast Guard pur-
                                              tures from the trust fund to meet the needs               ‘‘(H) $70,000,000 for fiscal year 2030.’’.           suant to existing authorities.
                                              of navigation for the fiscal year of the budg-            (3) EFFECTIVE DATE.—The amendments
                                              et request.’’.                                                                                                 SEC. 107. STATE CONTRIBUTION OF FUNDS FOR
                                                                                                      made by this subsection shall take effect on                       CERTAIN OPERATION AND MAINTE-
                                              SEC. 104. ADDITIONAL MEASURES AT DONOR
                                                                                                      October 1, 2022.                                                   NANCE COSTS.
                                                         PORTS AND ENERGY TRANSFER
                                                         PORTS.                                       SEC. 105. CONSTRUCTION OF WATER RESOURCES                In carrying out eligible operations and
                                                                                                                  DEVELOPMENT PROJECTS BY NON-               maintenance activities within the Great
                                                (a)   INTERIM    AUTHORIZATION.—Section                           FEDERAL INTERESTS.
                                              2106(f) of the Water Resources Reform and                                                                      Lakes Navigation System pursuant to sec-
                                                                                                        (a) STUDIES AND ENGINEERING.—Section                 tion 210 of the Water Resources Development
                                              Development Act of 2014 (33 U.S.C. 2238c(f)) is         204(c)(1) of the Water Resources Development
                                              amended—                                                                                                       Act of 1986 (33 U.S.C. 2238) in a State that has
                                                                                                      Act of 1986 (33 U.S.C. 2232(c)(1)) is amended          implemented any additional State limitation
                                                (1) in paragraph (1), by striking ‘‘2020’’ and        by striking ‘‘under subsection (b)’’ and in-
                                              inserting ‘‘2022’’; and                                                                                        on the disposal of dredged material in the
                                                                                                      serting ‘‘under this section’’.                        open waters of such State, the Secretary
                                                (2) by striking paragraph (3).                          (b) ASSUMPTION OF MAINTENANCE OF A LO-
                                                (b) IN GENERAL.—                                                                                             may, pursuant to section 5 of the Act of June
                                                                                                      CALLY PREFERRED PLAN.—Section 204(f) of
                                                (1) DEFINITIONS.—Section 2106(a) of the                                                                      22, 1936 (33 U.S.C. 701h), receive from such
                                                                                                      the Water Resources Development Act of
                                              Water Resources Reform and Development                                                                         State, and expend, such funds as may be con-
                                                                                                      1986 (33 U.S.C. 2232(f)) is amended to read as
                                              Act of 2014 (33 U.S.C. 2238c(a)) is amended—                                                                   tributed by the State to cover the additional
                                                                                                      follows:
                                                (A) in paragraph (3)(A)—                                ‘‘(f) OPERATION AND MAINTENANCE.—                    costs for operations and maintenance activi-
                                                (i) by amending clause (ii) to read as fol-             ‘‘(1) ASSUMPTION OF MAINTENANCE.—When-               ties for a harbor or inland harbor within
                                              lows:                                                   ever a non-Federal interest carries out im-            such State that result from such limitation.
                                                ‘‘(ii) at which the total amount of harbor            provements to a federally authorized harbor            SEC. 108. GREAT LAKES CONFINED DISPOSAL FA-
                                              maintenance taxes collected (including the                                                                                 CILITIES.
                                                                                                      or inland harbor, the Secretary shall be re-
                                              estimated taxes related to domestic cargo               sponsible for operation and maintenance in               (a) MITIGATION.—The Secretary may relo-
                                              and cruise passengers) comprise not less                accordance with section 101(b) if—                     cate access to the Port of Cleveland confined
                                              than $15,000,000 annually of the total funding            ‘‘(A) before construction of the improve-            disposal facility, owned or operated by a
                                              of the Harbor Maintenance Trust Fund on an              ments—                                                 non-Federal interest, in which material
                                              average annual basis for the previous 3 fiscal            ‘‘(i) the Secretary determines that the im-          dredged by the Corps of Engineers is placed.
                                              years;’’;                                               provements are feasible and consistent with              (b) COST-SHARE.—The cost to relocate ac-
                                                (ii) in clause (iii)—                                 the purposes of this title; and                        cess to the confined disposal facility de-
                                                (I) by inserting ‘‘(including the estimated             ‘‘(ii) the Secretary and the non-Federal in-         scribed in subsection (a) shall be shared in
                                              taxes related to domestic cargo and cruise              terest execute a written agreement relating            accordance with the cost share applicable to
                                              passengers)’’ after ‘‘taxes collected’’; and            to operation and maintenance of the im-                operation and maintenance of the Federal
                                                (II) by striking ‘‘5 fiscal years’’ and insert-       provements;                                            navigation project from which material
                                              ing ‘‘3 fiscal years’’; and                               ‘‘(B) the Secretary certifies that the               placed in the confined disposal facility is
                                                (iii) in clause (iv), by striking ‘‘in fiscal         project or separable element of the project is         dredged.
                                              year 2012’’ and inserting ‘‘on an average an-           constructed in accordance with applicable                (c) TERMINATION.—The authority provided
                                              nual basis for the previous 3 fiscal years’’;           permits and appropriate engineering and de-            under this section shall terminate on Decem-
                                                (B) in paragraph (5)(B), by striking ‘‘in fis-        sign standards; and                                    ber 31, 2024.
                                              cal year 2012’’ each place it appears and in-             ‘‘(C) the Secretary does not find that the           SEC. 109. INLAND WATERWAY PROJECTS.
                                              serting ‘‘on an average annual basis for the            project or separable element is no longer fea-           Notwithstanding section 102 of the Water
                                              previous 3 fiscal years’’;                              sible.                                                 Resources Development Act of 1986 (33 U.S.C.
                                                (C) by redesignating paragraph (8) as para-             ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN             2212), for a project for navigation on the in-
                                              graph (9) and inserting after paragraph (7)             THE COSTS OF A LOCALLY PREFERRED PLAN.—                land waterways receiving a construction ap-
                                              the following:                                          In the case of improvements determined by              propriation during any of fiscal years 2021
                                                ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—                 the Secretary pursuant to paragraph (1)(A)(i)          through 2031, 35 percent of the costs of con-
                                              The term ‘Harbor Maintenance Trust Fund’                to deviate from the national economic devel-           struction of the project shall be paid from
                                              means the Harbor Maintenance Trust Fund                 opment plan, the Secretary shall be respon-            amounts appropriated from the Inland Wa-
                                              established by section 9505 of the Internal             sible for all operation and maintenance costs          terways Trust Fund until such construction
                                              Revenue Code of 1986.’’; and                            of such improvements, as described in sec-             of the project is complete.
                                                (D) in paragraph (9), as so redesignated—             tion 101(b), including costs in excess of the          SEC.   110.
                                                                                                                                                                       IMPLEMENTATION OF WATER RE-
                                                (i) by amending subparagraph (B) to read              costs of the national economic development                        SOURCES PRINCIPLES AND RE-
                                              as follows:                                             plan, if the Secretary determines that the                        QUIREMENTS.
                                                ‘‘(B) at which the total amount of harbor             improvements satisfy the requirements of                 (a) IN GENERAL.—Not later than 180 days
                                              maintenance taxes collected (including the              paragraph (1).’’.                                      after the date of enactment of this Act, the
                                              estimated taxes related to domestic cargo                 (c) REPORT.—A non-Federal interest may               Secretary shall issue final agency-specific
                                              and cruise passengers) comprise annually                submit to the Secretary a report on improve-           procedures necessary to implement the prin-
                                              more than $5,000,000 but less than $15,000,000          ments to a federally authorized harbor or in-          ciples and requirements and the interagency
                                              of the total funding of the Harbor Mainte-              land harbor to be carried out by the non-Fed-          guidelines.
                                              nance Trust Fund on an average annual basis             eral interest, containing any information                (b) DEVELOPMENT OF FUTURE WATER RE-
                                              for the previous 3 fiscal years;’’;                     necessary for the Secretary determine                  SOURCES DEVELOPMENT PROJECTS.—The pro-
                                                (ii) in subparagraph (C)—                             whether the improvements satisfy the re-               cedures required by subsection (a) shall en-
                                                (I) by inserting ‘‘(including the estimated           quirements of section 204(f)(1) of the Water           sure that the Secretary, in the formulation




SSpencer on DSK126QN23PROD with HOUSE
                                              taxes related to domestic cargo and cruise              Resources Development Act of 1986 (33 U.S.C.           of future water resources development
                                              passengers)’’ after ‘‘taxes collected’’; and            2232), including—                                      projects—
                                                (II) by striking ‘‘5 fiscal years’’ and insert-         (1) the economic justification for the im-             (1) develops such projects in accordance
                                              ing ‘‘3 fiscal years’’; and                             provements;                                            with—
                                                (iii) in subparagraph (D), by striking ‘‘in             (2) details of the project improvement plan            (A) the guiding principles established by
                                              fiscal year 2012’’ and inserting ‘‘on an aver-          and design;                                            the principles and requirements; and
                                              age annual basis for the previous 3 fiscal                (3) proposed arrangements for the work to              (B) the national water resources planning
                                              years’’.                                                be performed; and                                      policy established by section 2031(a) of the




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00032   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6939
                                              Water Resources Development Act of 2007 (42             guidance of the Corps of Engineers necessary           study for a project for flood risk mitigation,
                                              U.S.C. 1962–3(a)); and                                  to implement any Executive order described             hurricane and storm damage risk reduction,
                                                 (2) fully identifies and analyzes national           in paragraph (1) with respect to water re-             or ecosystem restoration under section 905 of
                                              economic development benefits, regional                 sources development projects.                          the Water Resources Development Act of
                                              economic development benefits, environ-                   (3) REQUIREMENTS.—In updating the poli-              1986 (33 U.S.C. 2282), the Secretary shall con-
                                              mental quality benefits, and other societal             cies, regulations, or guidance under para-             sider whether the need for the project is
                                              effects.                                                graph (2), the Secretary shall—                        predicated upon or exacerbated by conditions
                                                 (c) REVIEW AND UPDATE.—Every 5 years,                  (A) provide notice to interested non-Fed-            related to sea level rise or inland flooding.
                                              the Secretary shall review and, where appro-            eral stakeholders, including representatives             (2) ADDRESSING SEA LEVEL RISE AND INLAND
                                              priate, revise the procedures required by sub-          of minority communities, low-income com-               FLOODING RESILIENCY BENEFITS.—To the max-
                                              section (a).                                            munities, and Indian Tribes;                           imum extent practicable, in carrying out a
                                                 (d) PUBLIC REVIEW, NOTICE, AND COM-                    (B) provide opportunities for interested             study pursuant to paragraph (1), the Sec-
                                              MENT.—In issuing, reviewing, and revising               stakeholders to comment on potential up-               retary shall document the potential effects
                                              the procedures required by this section, the            dates of policies, regulations, or guidance;           of sea level rise or inland flooding on the
                                              Secretary shall—                                          (C) consider the recommendations from the            project, and the expected benefits of the
                                                 (1) provide notice to interested non-Fed-            reports submitted under subsection (a); and            project relating to sea level rise or inland
                                              eral stakeholders of the Secretary’s intent to            (D) promote the meaningful involvement               flooding, during the 50-year period after the
                                              revise the procedures;                                  of minority communities, low-income com-               date of completion of the project.
                                                 (2) provide opportunities for interested             munities, and Indian Tribes.                           SEC. 114. SMALL FLOOD CONTROL PROJECTS.
                                              non-Federal stakeholders to engage with,                  (c) COMMUNITY ENGAGEMENT.—In carrying
                                                                                                                                                               Section 205 of the Flood Control Act of 1948
                                              and provide input and recommendations to,               out a water resources development project,
                                                                                                                                                             (33 U.S.C. 701s) is amended by inserting ‘‘,
                                              the Secretary on the revision of the proce-             the Secretary shall, to the extent prac-
                                                                                                      ticable—                                               and projects that use natural features or na-
                                              dures; and                                                                                                     ture-based features (as those terms are de-
                                                 (3) solicit and consider public and expert             (1) promote the meaningful involvement of
                                                                                                      minority communities, low-income commu-                fined in section 1184(a) of the Water Re-
                                              comments.                                                                                                      sources Development Act of 2016 (33 U.S.C.
                                                 (e) DEFINITIONS.—In this section:                    nities, and Indian Tribes;
                                                                                                        (2) provide guidance and technical assist-           2289a(a))),’’ after ‘‘nonstructural projects’’.
                                                 (1) INTERAGENCY GUIDELINES.—The term                                                                        SEC. 115. FLOOD PROTECTION PROJECTS.
                                              ‘‘interagency guidelines’’ means the inter-             ance to such communities or Tribes to in-
                                                                                                      crease understanding of the project develop-             (a)   GENERAL    CONSIDERATIONS.—Section
                                              agency guidelines contained in the document
                                                                                                      ment and implementation activities, regula-            73(a) of the Water Resources Development
                                              finalized by the Council on Environmental
                                                                                                      tions, and policies of the Corps of Engineers;         Act of 1974 (33 U.S.C. 701b–11(a)) is amended
                                              Quality pursuant to section 2031 of the Water
                                                                                                      and                                                    by striking ‘‘including’’ and all that follows
                                              Resources Development Act of 2007 (42 U.S.C.
                                                                                                        (3) cooperate with State, Tribal, and local          through the period at the end and inserting
                                              1962–3) in December 2014, to implement the
                                                                                                      governments with respect to activities car-            the following: ‘‘, with a view toward formu-
                                              principles and requirements.
                                                                                                      ried out pursuant to this subsection.                  lating the most economically, socially, and
                                                 (2) PRINCIPLES AND REQUIREMENTS.—The
                                                                                                        (d) TRIBAL LANDS AND CONSULTATION.—In                environmentally acceptable means of reduc-
                                              term ‘‘principles and requirements’’ means
                                                                                                      carrying out water resources development               ing or preventing flood damage, including—
                                              the principles and requirements contained in
                                                                                                      projects, the Secretary shall, to the extent             ‘‘(1) floodproofing of structures, including
                                              the document prepared by the Council on En-
                                                                                                      practicable and in accordance with the Trib-           through elevation;
                                              vironmental Quality pursuant to section 2031
                                                                                                      al Consultation Policy affirmed and formal-              ‘‘(2) floodplain regulation;
                                              of the Water Resources Development Act of
                                                                                                      ized by the Secretary on November 1, 2012 (or            ‘‘(3) acquisition of floodplain land for rec-
                                              2007 (42 U.S.C. 1962–3), entitled ‘‘Principles
                                                                                                      a successor policy)—                                   reational, fish and wildlife, and other public
                                              and Requirements for Federal Investments
                                                                                                        (1) promote meaningful involvement with              purposes;
                                              in Water Resources’’, and dated March 2013.
                                                                                                      Indian Tribes specifically on any Tribal                 ‘‘(4) relocation; and
                                              SEC. 111. RESILIENCY PLANNING ASSISTANCE.               lands near or adjacent to any water re-                  ‘‘(5) the use of a feature described in sec-
                                                (a) IN GENERAL.—Section 206(a) of the                 sources development projects, for purposes of          tion 1184(a) of the Water Infrastructure Im-
                                              Flood Control Act of 1960 (33 U.S.C. 709a(a))           identifying lands of ancestral, cultural, or           provements for the Nation Act (33 U.S.C.
                                              is amended by inserting ‘‘, to avoid repet-             religious importance;                                  2289a(a)).’’.
                                              itive flooding impacts, to anticipate, pre-               (2) consult with Indian Tribes specifically            (b)     CONFORMING     AMENDMENT.—Section
                                              pare, and adapt to changing climatic condi-             on any Tribal areas near or adjacent to any            103(b) of the Water Resources Development
                                              tions and extreme weather events, and to                water resources development projects, for              Act of 1986 (33 U.S.C. 2213) is amended—
                                              withstand, respond to, and recover rapidly              purposes of identifying lands, waters, and               (1) in the subsection heading, by striking
                                              from disruption due to the flood hazards’’              other resources critical to the livelihood of          ‘‘NONSTRUCTURAL FLOOD CONTROL PROJECTS’’
                                              after ‘‘in planning to ameliorate the flood             the Indian Tribes; and                                 and inserting ‘‘PROJECTS USING NON-
                                              hazard’’.                                                 (3) cooperate with Indian Tribes to avoid,           STRUCTURAL, NATURAL, OR NATURE-BASED
                                                (b) PRIORITIZING FLOOD RISK RESILIENCY                or otherwise find alternate solutions with re-         FEATURES’’; and
                                              TECHNICAL ASSISTANCE.—In carrying out sec-              spect to, such areas.                                    (2) in paragraph (1)—
                                              tion 206 of the Flood Control Act of 1960 (33           SEC. 113. REVIEW OF RESILIENCY ASSESSMENTS.              (A) by striking ‘‘nonstructural flood con-
                                              U.S.C. 709a), the Secretary shall prioritize              (a) RESILIENCY ASSESSMENT.—                          trol measures’’ and inserting ‘‘a flood risk
                                              the provision of technical assistance to sup-             (1) IN GENERAL.—Not later than 180 days              management or hurricane and storm damage
                                              port flood risk resiliency planning efforts of          after the date of enactment of this section,           risk reduction measure using a non-
                                              economically disadvantaged communities or               and in conjunction with the development of             structural feature, or a natural feature or
                                              communities subject to repetitive flooding.             procedures under section 110 of this Act, the          nature-based feature (as those terms are de-
                                              SEC. 112. PROJECT CONSULTATION.                         Secretary is directed to review, and where             fined in section 1184(a) of the Water Re-
                                                (a) REPORTS REQUIRED.—Not later than 180              appropriate, revise the existing planning              sources Development Act of 2016 (33 U.S.C.
                                              days after the date of enactment of this Act,           guidance documents and regulations of the              2289a(a))),’’; and
                                              the Secretary shall submit the following re-            Corps of Engineers on the assessment of the              (B) by striking ‘‘cash during construction
                                              ports:                                                  effects of sea level rise or inland flooding on        of the project’’ and inserting ‘‘cash during
                                                (1) The report required under section 1214            future water resources development projects            construction for a nonstructural feature if
                                              of the Water Resources Development Act of               to ensure that such guidance documents and             the costs of land, easements, rights-of-way,
                                              2018 (132 Stat. 3809).                                  regulations are based on the best available,           dredged material disposal areas, and reloca-
                                                (2) The report required under section                 peer-reviewed science and data on the cur-             tions for such feature are estimated to ex-
                                              1120(a)(3) of the Water Resources Develop-              rent and future effects of sea level rise or in-       ceed 35 percent’’.
                                              ment Act of 2016 (130 Stat. 1643).                      land flooding on relevant communities.                 SEC. 116. FEASIBILITY STUDIES; REVIEW OF NAT-
                                                (b) ENVIRONMENTAL JUSTICE UPDATES.—                     (2) COORDINATION.—In carrying out this                           URAL AND NATURE-BASED FEA-
                                                (1) IN GENERAL.—In the formulation of                 subsection, the Secretary shall—                                   TURES.
                                              water development resources projects, the                 (A) coordinate the review with the Engi-               (a) TECHNICAL CORRECTION.—Section 1149(c)
                                              Secretary shall comply with any existing Ex-            neer Research and Development Center,                  of the Water Resources Development Act of
                                              ecutive order regarding environmental jus-              other Federal and State agencies, and other            2018 (33 U.S.C. 2282 note; 132 Stat. 3787) is
                                              tice in effect as of the date of enactment of           relevant entities; and                                 amended by striking ‘‘natural infrastructure




SSpencer on DSK126QN23PROD with HOUSE
                                              this Act to address any disproportionate and              (B) to the maximum extent practicable and            alternatives’’ and inserting ‘‘natural feature
                                              adverse human health or environmental ef-               where appropriate, utilize data provided to            or nature-based feature alternatives (as such
                                              fects on minority communities, low-income               the Secretary by such agencies.                        terms are defined in section 1184 of the Water
                                              communities, and Indian Tribes.                           (b) ASSESSMENT OF BENEFITS FROM AD-                  Resources Development Act of 2016 (32 U.S.C.
                                                (2) UPDATE.—Not later than 1 year after               DRESSING SEA LEVEL RISE AND INLAND FLOOD-              2289a))’’.
                                              the date of enactment of this Act, the Sec-             ING RESILIENCY IN FEASIBILITY REPORTS.—                  (b) SUMMARY OF ANALYSIS.—To the max-
                                              retary shall review, and shall update, where              (1) IN GENERAL.—Upon the request of a non-           imum extent practicable, the Secretary shall
                                              appropriate, any policies, regulations, and             Federal interest, in carrying out a feasibility        include in each feasibility report developed




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00033   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6940                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              under section 905 of the Water Resources De-            SEC. 118. PILOT PROGRAMS ON THE FORMULA-               tures, that avoid or reduce at least 50 per-
                                              velopment Act of 1986 (33 U.S.C. 2282) for a                        TION OF CORPS OF ENGINEERS                 cent of flood or storm damages in one or
                                              project that contains a flood risk manage-                          PROJECTS IN RURAL COMMUNITIES
                                                                                                                                                             more of the alternatives included in the final
                                                                                                                  AND   ECONOMICALLY  DISADVAN-
                                              ment or hurricane and storm damage risk re-                                                                    alternatives evaluated.
                                                                                                                  TAGED COMMUNITIES.
                                              duction element, a summary of the natural                                                                        (6) NOTIFICATION.—The Secretary shall no-
                                                                                                        (a) IN GENERAL.—The Secretary shall es-
                                              feature or nature-based feature alternatives,                                                                  tify the Committee on Transportation and
                                                                                                      tablish and implement pilot programs, in ac-
                                              along with their long-term costs and bene-                                                                     Infrastructure of the House of Representa-
                                                                                                      cordance with this section, to evaluate op-
                                              fits, that were evaluated in the development                                                                   tives and the Committee on Environment
                                                                                                      portunities to address the flood risk manage-
                                              of the feasibility report, and, if such alter-                                                                 and Public Works of the Senate of the selec-
                                              natives were not included in the rec-                   ment and hurricane and storm damage risk
                                                                                                      reduction needs of rural communities and               tion of each feasibility study under the pilot
                                              ommended plan, an explanation of why such                                                                      program.
                                              alternatives were not included in the rec-              economically disadvantaged communities.
                                                                                                        (b) ECONOMICALLY DISADVANTAGED COMMU-                  (7) COMPLETION.—Upon completion of a fea-
                                              ommended plan.                                                                                                 sibility report for a feasibility study selected
                                                                                                      NITY FLOOD PROTECTION AND HURRICANE AND
                                              SEC. 117. FEDERAL INTEREST DETERMINATION.                                                                      to be carried out under this subsection, the
                                                                                                      STORM DAMAGE REDUCTION STUDY PILOT PRO-
                                                Section 905 of the Water Resources Devel-                                                                    Secretary shall transmit the report to Con-
                                                                                                      GRAM.—
                                              opment Act of 1986 (33 U.S.C. 2282) is amend-                                                                  gress for authorization, and shall include the
                                                                                                        (1) IN GENERAL.—Not later than 180 days
                                              ed by inserting after subsection (a) the fol-                                                                  report in the next annual report submitted
                                              lowing:                                                 after the date of enactment of this Act, the
                                                                                                      Secretary shall establish and implement a              under section 7001 of the Water Resources
                                                ‘‘(b) FEDERAL INTEREST DETERMINATION.—                                                                       Reform and Development Act of 2014 (33
                                                ‘‘(1) IN GENERAL.—                                    pilot program to carry out feasibility stud-
                                                                                                      ies, in accordance with this subsection, for           U.S.C. 2282d).
                                                ‘‘(A) ECONOMICALLY DISADVANTAGED COMMU-                                                                        (c) PILOT PROGRAM FOR THE RECOMMENDA-
                                              NITIES.—In preparing a feasibility report               flood risk management and hurricane and
                                                                                                                                                             TION OF FLOOD PROTECTION AND HURRICANE
                                              under subsection (a) for a study that will              storm damage risk reduction projects for
                                                                                                                                                             AND STORM DAMAGE REDUCTION PROJECTS IN
                                              benefit an economically disadvantaged com-              economically disadvantaged communities, in
                                                                                                      coordination with non-Federal interests.               RURAL COMMUNITIES AND ECONOMICALLY DIS-
                                              munity, upon request by the non-Federal in-                                                                    ADVANTAGED COMMUNITIES.—
                                              terest for the study, the Secretary shall first           (2) PARTICIPATION IN PILOT PROGRAM.—In
                                                                                                                                                               (1) IN GENERAL.—Not later than 180 days
                                              determine the Federal interest in carrying              carrying out paragraph (1), the Secretary
                                                                                                                                                             after the date of enactment of this Act, the
                                              out the study and the projects that may be              shall—
                                                                                                                                                             Secretary shall establish and implement a
                                              proposed in the study.                                    (A) publish a notice in the Federal Register
                                                                                                                                                             pilot program to evaluate, and make rec-
                                                ‘‘(B) OTHER COMMUNITIES.—                             that requests from non-Federal interests
                                                                                                                                                             ommendations to Congress on, flood risk
                                                ‘‘(i) AUTHORIZATION.—In preparing a feasi-            proposals for the potential feasibility study
                                                                                                                                                             management projects and hurricane and
                                              bility report under subsection (a) for a study          of a flood risk management project or hurri-
                                                                                                                                                             storm damage risk reduction projects in
                                              that will benefit a covered community, upon             cane and storm damage risk reduction
                                                                                                                                                             rural communities or economically dis-
                                              request by the non-Federal interest for the             project for an economically disadvantaged
                                                                                                                                                             advantaged communities, without dem-
                                              study, the Secretary may, with respect to               community;
                                                                                                                                                             onstrating that each project is justified sole-
                                              not more than 3 studies in each fiscal year,              (B) upon request of a non-Federal interest
                                                                                                                                                             ly by national economic development bene-
                                              first determine the Federal interest in car-            for such a project, provide technical assist-
                                                                                                                                                             fits.
                                              rying out the study and the projects that               ance to such non-Federal interest in the for-
                                                                                                                                                               (2) CONSIDERATIONS.—In carrying out this
                                              may be proposed in the study.                           mulation of a proposal for a potential feasi-
                                                                                                                                                             subsection, the Secretary may make a rec-
                                                ‘‘(ii) COVERED COMMUNITIES.—In this sub-              bility study to be submitted to the Secretary
                                                                                                                                                             ommendation to Congress on up to 10
                                              paragraph, the term ‘covered community’                 under the pilot program; and
                                                                                                                                                             projects, without demonstrating that the
                                              means a community that—                                   (C) review such proposals and select 10 fea-
                                                                                                                                                             project is justified solely by national eco-
                                                ‘‘(I) is not an economically disadvantaged            sibility studies for such projects to be car-
                                                                                                                                                             nomic development benefits, if the Secretary
                                              community; and                                          ried out by the Secretary, in coordination
                                                                                                                                                             determines that—
                                                ‘‘(II) the Secretary finds has a compelling           with the non-Federal interest, under this
                                                                                                                                                               (A) the community to be served by the
                                              need for the Secretary to make a determina-             pilot program.
                                                                                                                                                             project is an economically disadvantaged
                                              tion under clause (i).                                    (3) SELECTION CRITERIA.—In selecting a fea-
                                                                                                                                                             community or a rural community;
                                                ‘‘(2) COST SHARE.—The costs of a deter-               sibility study under paragraph (2)(C), the
                                                                                                                                                               (B) the long-term life safety, economic via-
                                              mination under paragraph (1)—                           Secretary shall consider whether—
                                                                                                                                                             bility, and environmental sustainability of
                                                ‘‘(A) shall be at Federal expense; and                  (A) the percentage of people living in pov-
                                                                                                                                                             the community would be threatened without
                                                ‘‘(B) shall not exceed $200,000.                      erty in the county or counties (or county-
                                                                                                                                                             the project; and
                                                ‘‘(3) DEADLINE.—A determination under                 equivalent entity or entities) in which the
                                                                                                                                                               (C) the project is consistent with the re-
                                              paragraph (1) shall be completed by not later           project is located is greater than the per-
                                                                                                                                                             quirements of section 1 of the Flood Control
                                              than 120 days after the date on which funds             centage of people living in poverty in the
                                                                                                                                                             Act of 1936 (33 U.S.C. 701a).
                                              are made available to the Secretary to carry            State, based on census bureau data;
                                                                                                                                                               (3) CONSISTENCY.—In carrying out this sub-
                                              out the determination.                                    (B) the percentage of families with income
                                                                                                                                                             section, the Secretary shall ensure that
                                                ‘‘(4) TREATMENT.—                                     above the poverty threshold but below the
                                                                                                                                                             project recommendations are consistent
                                                ‘‘(A) TIMING.—The period during which a               average household income in the county or
                                                                                                                                                             with the principles and requirements and the
                                              determination is being completed under                  counties (or county-equivalent entity or en-
                                                                                                                                                             interagency guidelines, as such terms are de-
                                              paragraph (1) for a study shall not be in-              tities) in which the project is located is
                                                                                                                                                             fined in section 110 of this Act, including the
                                              cluded for purposes of the deadline to com-             greater than such percentage for the State,
                                                                                                                                                             consideration of quantifiable monetary and
                                              plete a final feasibility report under section          based on census bureau data;
                                                                                                                                                             nonmonetary benefits of the project.
                                              1001(a)(1) of the Water Resources Reform and              (C) the percentage of the population that
                                                                                                                                                               (4) PRIORITIZATION.—The Secretary may
                                              Development Act of 2014 (33 U.S.C.                      identifies as belonging to a minority or in-
                                                                                                                                                             give equivalent budgetary consideration and
                                              2282c(a)(1)).                                           digenous group in the county or counties (or
                                                                                                                                                             priority to projects recommended under this
                                                ‘‘(B) COST.—The cost of a determination               county-equivalent entity or entities) in
                                                                                                                                                             subsection.
                                              under paragraph (1) shall not be included for           which the project is located is greater than
                                                                                                                                                               (d) GEOGRAPHIC DIVERSITY.—In selecting
                                              purposes of the maximum Federal cost under              the average such percentage in the State,              feasibility studies under subsection (b)(2)(C)
                                              section 1001(a)(2) of the Water Resources Re-           based on census bureau data; and                       or in making project recommendations
                                              form and Development Act of 2014 (33 U.S.C.               (D) the project is addressing flooding or            under subsection (c), the Secretary shall con-
                                              2282c(a)(2)).                                           hurricane or storm damage effects that have            sider the geographic diversity among pro-
                                                ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If,             a disproportionate impact on a rural commu-            posed projects.
                                              based on a determination under paragraph                nity, a minority community, or an Indian                 (e) REPORT.—Not later than 5 years and 10
                                              (1), the Secretary determines that a study or           Tribe.                                                 years after the date of enactment of this
                                              project is not in the Federal interest because            (4) ADMINISTRATION.—Notwithstanding the              Act, the Secretary shall submit to the Com-
                                              the project will not result, or is unlikely to          requirements of section 105(a)(1)(A) of the            mittee on Transportation and Infrastructure
                                              result, in a recommended plan that will                 Water Resources Development Act of 1986 (33            of the House of Representatives and the
                                              produce national economic development ben-              U.S.C. 2215), the Federal share of the cost of         Committee on Environment and Public
                                              efits greater than cost, but may result in a            a feasibility study carried out under the              Works of the Senate, and make publicly
                                              technically sound and environmentally ac-               pilot program shall be 100 percent.                    available, a report detailing the results of




SSpencer on DSK126QN23PROD with HOUSE
                                              ceptable plan that is otherwise consistent                (5) STUDY REQUIREMENTS.—Feasibility stud-            the pilot programs carried out under this
                                              with section 904 of the Water Resources De-             ies carried out under this subsection shall, to        section, including—
                                              velopment Act of 1986 (33 U.S.C. 2281), the             the maximum extent practicable, incor-                   (1) a description of proposals received from
                                              Secretary shall issue a report to the non-              porate natural features or nature-based fea-           non-Federal interests pursuant to subsection
                                              Federal interest with recommendations on                tures (as such terms are defined in section            (b)(2)(A);
                                              how the non-Federal interest might modify               1184 of the Water Resources Development                  (2) a description of technical assistance
                                              the proposal such that the project could be             Act of 2016 (33 U.S.C. 2289a)), or a combina-          provided to non-Federal interests under sub-
                                              in the Federal interest and feasible.’’.                tion of such features and nonstructural fea-           section (b)(2)(B);




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00034   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6941
                                                (3) a description of proposals selected               in paragraph (1) exceeds $17,500,000, the Sec-            (B) in paragraph (1), in the heading, by
                                              under subsection (b)(2)(C) and criteria used            retary shall submit the project recommenda-            striking ‘‘IN GENERAL’’ and inserting ‘‘LEVEE
                                              to select such proposals;                               tion to Congress for authorization prior to            OWNER’S MANUAL’’;
                                                (4) a description of the projects evaluated           construction, and shall include the project               (C) by redesignating paragraphs (2) and (3)
                                              or recommended by the Secretary under sub-              recommendation in the next annual report               as paragraphs (3) and (4), respectively, and
                                              section (c);                                            submitted under section 7001 of the Water              inserting after paragraph (1) the following:
                                                (5) a description of the quantifiable mone-           Resources Reform and Development Act of                   ‘‘(2) COMPLIANCE.—
                                              tary and nonmonetary benefits associated                2014.                                                     ‘‘(A) IN GENERAL.—Notwithstanding the
                                              with the projects recommended under sub-                  (C) FINANCING.—                                      status of compliance of a non-Federal inter-
                                              section (c); and                                          (i) CONTRIBUTIONS.—If, based on a study              est with the requirements of a levee owner’s
                                                (6) any recommendations to Congress on                carried out pursuant to paragraph (1), the             manual described in paragraph (1), or with
                                              how the Secretary can address the flood risk            Secretary determines that a project de-                any other eligibility requirement established
                                              management and hurricane and storm dam-                 scribed in paragraph (1) will not produce ben-         by the Secretary related to the maintenance
                                              age risk reduction needs of economically dis-           efits greater than cost, the Secretary shall           and upkeep responsibilities of the non-Fed-
                                              advantaged communities.                                 allow the affected community to pay, or pro-           eral interest, the Secretary shall consider
                                                (f) STATE DEFINED.—In this section, the               vide contributions equal to, an amount suffi-          the non-Federal interest to be eligible for re-
                                              term ‘‘State’’ means each of the several                cient to make the remaining costs of design            pair and rehabilitation assistance under this
                                              States, the District of Columbia, and each of           and construction of the project equal to the           section if the non-Federal interest—
                                              the commonwealths, territories, and posses-             estimated value of the benefits of the                    ‘‘(i) enters into a written agreement with
                                              sions of the United States.                             project.                                               the Secretary that identifies any items of de-
                                                (g) SUNSET.—The authority to commence a                 (ii) EFFECT ON NON-FEDERAL SHARE.—                   ferred or inadequate maintenance and up-
                                              feasibility study under subsection (b), and             Amounts provided by an affected community              keep identified by the Secretary prior to the
                                              the authority make a recommendation under               under clause (i) shall be in addition to any           natural disaster; and
                                              subsection (c), shall terminate on the date             payments or contributions the affected com-               ‘‘(ii) pays, during performance of the repair
                                              that is 10 years after the date of enactment            munity is required to provide toward the re-           and rehabilitation work, all costs to ad-
                                              of this Act.                                            maining costs of design and construction of            dress—
                                              SEC. 119. PERMANENT MEASURES TO REDUCE                  the project under section 103 of the Water                ‘‘(I) any items of deferred or inadequate
                                                         EMERGENCY      FLOOD     FIGHTING            Resources Development Act of 1986 (33 U.S.C.           maintenance and upkeep identified by the
                                                         NEEDS FOR COMMUNITIES SUBJECT                2213).
                                                         TO REPETITIVE FLOODING.                                                                             Secretary; and
                                                                                                        (4) ABILITY TO PAY.—                                    ‘‘(II) any repair or rehabilitation work nec-
                                                (a) DEFINITIONS.—In this section:                       (A) IN GENERAL.—Any cost-sharing agree-
                                                (1) AFFECTED COMMUNITY.—The term ‘‘af-                                                                       essary to address damage the Secretary at-
                                                                                                      ment for a project entered into pursuant to            tributes to such deferred or inadequate
                                              fected community’’ means a legally con-                 this section shall be subject to the ability of
                                              stituted public body (as that term is used in                                                                  maintenance or upkeep.
                                                                                                      the affected community to pay.                            ‘‘(B) ELIGIBILITY.—The Secretary may only
                                              section 221(b) of the Flood Control Act of                (B) DETERMINATION.—The ability of any af-
                                              1970 (42 U.S.C. 1962d–5b(b))—                                                                                  enter into one agreement under subpara-
                                                                                                      fected community to pay shall be deter-
                                                (A) with jurisdiction over an area that has                                                                  graph (A) with any non-Federal interest.
                                                                                                      mined by the Secretary in accordance with
                                              been subject to flooding in two or more                                                                           ‘‘(C) SUNSET.—The authority of the Sec-
                                                                                                      procedures established by the Secretary.
                                              events in any 10-year period; and                                                                              retary to enter into agreements under para-
                                                                                                        (C) EFFECT OF REDUCTION.—Any reduction
                                                (B) that has received emergency flood-                                                                       graph (2) shall terminate on the date that is
                                                                                                      in the non-Federal share of the cost of a
                                              fighting assistance, including construction                                                                    5 years after the date of enactment of this
                                                                                                      project described in paragraph (1) as a result
                                              of temporary barriers by the Secretary,                                                                        paragraph.’’; and
                                                                                                      of a determination under this paragraph
                                              under section 5 of the Act of August 18, 1941                                                                     (D) in paragraph (3) (as so redesignated), by
                                                                                                      shall not be included in the Federal share for
                                              (33 U.S.C. 701n) with respect to such flood                                                                    striking ‘‘this subsection’’ and inserting
                                                                                                      purposes of subparagraphs (A) and (B) of
                                              events.                                                                                                        ‘‘paragraph (1)’’.
                                                                                                      paragraph (3).
                                                (2) NATURAL FEATURE; NATURE-BASED FEA-                SEC. 120. EMERGENCY RESPONSE TO NATURAL                SEC. 121. COST AND BENEFIT FEASIBILITY AS-
                                              TURE.—The terms ‘‘natural feature’’ and ‘‘na-                      DISASTERS.                                             SESSMENT.
                                              ture-based feature’’ have the meanings given               Section 5 of the Act of August 18, 1941 (33           Section 1161(b) of the Water Resources De-
                                              those terms in section 1184 of the Water Re-            U.S.C. 701n) is amended—                               velopment Act of 2018 (33 U.S.C. 701n note) is
                                              sources Development Act of 2016 (33 U.S.C.                 (1) in subsection (a)—                              amended—
                                              2289a).                                                    (A) in paragraph (2)(B)—                              (1) in the matter preceding paragraph (1)—
                                                (b) PROGRAM.—                                            (i) in clause (i)(I), by inserting ‘‘, or pro-        (A) by striking the ‘‘three fiscal years pre-
                                                (1) IN GENERAL.—The Secretary is author-              vide contributions equal to,’’ after ‘‘pay’’;          ceding’’ and inserting ‘‘five fiscal years pre-
                                              ized to carry out a program to study, design,           and                                                    ceding’’; and
                                              and construct water resources development                  (ii) in clause (ii)—                                  (B) by striking ‘‘last day of the third fiscal
                                              projects through measures involving, among                 (I) in the heading, by inserting ‘‘AND CON-         year’’ and inserting ‘‘last day of the fifth fis-
                                              other things, strengthening, raising, extend-           TRIBUTIONS’’ after ‘‘OF PAYMENTS’’;                    cal year’’;
                                              ing, realigning, or otherwise modifying ex-                (II) by inserting ‘‘or contributions’’ after          (2) in paragraph (1), by inserting ‘‘, or pro-
                                              isting flood control works, designing new               ‘‘Non-Federal payments’’; and                          vide contributions equal to,’’ before ‘‘an
                                              works, and incorporating natural features,                 (III) by inserting ‘‘or contributions’’ after       amount sufficient’’; and
                                              nature-based features, or nonstructural fea-            ‘‘non-Federal payments’’; and                            (3) by striking paragraph (2) and inserting
                                              tures, as appropriate to provide flood and                 (B) by adding at the end the following:             the following:
                                              coastal storm risk management to affected                  ‘‘(5) FEASIBILITY STUDY.—                             ‘‘(2) the Secretary determines that the
                                              communities.                                               ‘‘(A) DETERMINATION.—Not later than 180             damage to the structure was not as a result
                                                (2) CONSIDERATIONS.—In carrying out para-             days after receiving, from a non-Federal               of negligent operation or maintenance.’’.
                                              graph (1), the Secretary shall, to the max-             sponsor of a project to repair or rehabilitate         SEC. 122. EXPEDITING REPAIRS AND RECOVERY
                                              imum extent practical, review and, where                a flood control work described in paragraph                        FROM FLOODING.
                                              appropriate, incorporate natural features or            (1), a request to initiate a feasibility study           (a) IN GENERAL.—To the maximum extent
                                              nature-based features, or a combination of              to further modify the relevant flood control           practicable, during the 5-year period begin-
                                              such features and nonstructural features,               work to provide for an increased level of pro-         ning on the date of enactment of this Act,
                                              that avoid or reduce at least 50 percent of             tection, the Secretary shall provide to the            the Secretary shall prioritize and expedite
                                              flood or storm damages in one or more of the            non-Federal sponsor a written decision on              the processing of applications for permits
                                              alternatives included in the final alter-               whether the Secretary has the authority                under section 10 of the Act of March 3, 1899
                                              natives evaluated.                                      under section 216 of the Flood Control Act of          (33 U.S.C. 403), and section 404 of the Federal
                                                (3) CONSTRUCTION.—                                    1970 (33 U.S.C. 549a) to undertake the re-             Water Pollution Control Act (33 U.S.C. 1344),
                                                (A) IN GENERAL.—The Secretary may carry               quested feasibility study.                             and permissions under section 14 of the Act
                                              out a project described in paragraph (1) with-             ‘‘(B) RECOMMENDATION.—If the Secretary              of March 3, 1899 (33 U.S.C. 408), to complete
                                              out further congressional authorization if—             determines under subparagraph (B) that the             repairs, reconstruction (including improve-
                                                (i) the Secretary determines that the                 Secretary does not have the authority to un-           ments), and upgrades to flood control infra-
                                              project—                                                dertake the requested feasibility study, the           structure damaged by flooding events during




SSpencer on DSK126QN23PROD with HOUSE
                                                (I) is advisable to reduce the risk of flood-         Secretary shall include the request for a fea-         calendar years 2017 through 2020, including
                                              ing for an affected community; and                      sibility study in the annual report submitted          flooding events caused by ice jams.
                                                (II) produces benefits that are in excess of          under section 7001 of the Water Resources                (b) SAVINGS PROVISION.—Nothing in this
                                              the estimated costs; and                                Reform and Development Act of 2014.’’; and             section affects any obligation to comply
                                                (ii) the Federal share of the cost of the                (2) in subsection (c)—                              with the requirements of any Federal law,
                                              construction does not exceed $17,500,000.                  (A) in the subsection heading, by striking          including—
                                                (B) SPECIFIC AUTHORIZATION.—If the Fed-               ‘‘LEVEE OWNERS MANUAL’’ and inserting                    (1) the National Environmental Policy Act
                                              eral share of the cost of a project described           ‘‘ELIGIBILITY’’;                                       of 1969 (42 U.S.C. 4321 et seq.);




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00035   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6942                                             CONGRESSIONAL RECORD — HOUSE                                                        December 8, 2020
                                                (2) the Federal Water Pollution Control               based on the criteria in subsection (c), in-              (II) in subparagraph (B), by striking ‘‘flood
                                              Act (33 U.S.C. 1251 et seq.); and                       cluding information about the request and              and storm damage and flood reduction bene-
                                                (3) the Endangered Species Act of 1973 (16            the reasons for the Secretary’s determina-             fits’’ and inserting ‘‘hurricane and storm or
                                              U.S.C. 1531 et seq.).                                   tion.’’.                                               flood risk reduction benefits’’; and
                                              SEC. 123. REVIEW OF CORPS OF ENGINEERS AS-              SEC. 124. SENSE OF CONGRESS ON MULTIPUR-                  (ii) by adding at the end the following:
                                                          SETS.                                                   POSE PROJECTS.                                ‘‘(5) SELECTION OF DREDGED MATERIAL DIS-
                                                Section 6002 of the Water Resources Re-                 It is the sense of Congress that the Sec-            POSAL METHOD FOR CERTAIN PURPOSES.—Ac-
                                              form and Development Act of 2014 (128 Stat.             retary, in coordination with non-Federal in-           tivities carried out under this subsection—
                                              1349) is amended to read as follows:                    terests, should maximize the development,                 ‘‘(A) shall be carried out using amounts ap-
                                                                                                      evaluation, and recommendation of project              propriated for construction or operation and
                                              ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS AS-
                                                            SETS.                                     alternatives for future water resources devel-         maintenance of the project involving the dis-
                                                                                                      opment projects that produce multiple                  posal of the dredged material; and
                                                 ‘‘(a) ASSESSMENT.—The Secretary shall
                                                                                                      project benefits, such as navigation, flood               ‘‘(B) shall not carried out using amounts
                                              conduct an assessment of projects con-
                                                                                                      risk management, and ecosystem restoration             made available under subsection (g).’’.
                                              structed by the Secretary for which the Sec-            benefits, including through the use of nat-               (b) BENEFICIAL USE OF DREDGED MATE-
                                              retary continues to have financial or oper-             ural or nature-based features and the bene-            RIAL.—
                                              ational responsibility.                                 ficial use of dredged material.                           (1) PILOT PROGRAM PROJECTS.—Section 1122
                                                ‘‘(b) INVENTORY.—Not later than 18 months             SEC. 125. BENEFICIAL USE OF DREDGED MATE-              of the Water Resources Development Act of
                                              after the date of enactment of the Water Re-                        RIAL; DREDGED MATERIAL MANAGE-             2016 (33 U.S.C. 2326 note) is amended—
                                              sources Development Act of 2020, the Sec-                           MENT PLANS.                                   (A) in subsection (a)—
                                              retary shall, based on the assessment carried             (a) NATIONAL POLICY ON THE BENEFICIAL                   (i) in paragraph (6), by striking ‘‘; and’’ and
                                              out under subsection (a), develop an inven-             USE OF DREDGED MATERIAL.—                              inserting a semicolon;
                                              tory of projects or portions of projects—                 (1) IN GENERAL.—It is the policy of the                 (ii) in paragraph (7)(C), by striking the pe-
                                                ‘‘(1) that are not needed for the missions of         United States for the Corps of Engineers to            riod at the end and inserting ‘‘; and’’; and
                                              the Corps of Engineers;                                 maximize the beneficial use, in an environ-               (iii) by adding at the end the following:
                                                ‘‘(2) the modification of which, including            mentally acceptable manner, of suitable                   ‘‘(8) recovering lost storage capacity in res-
                                              though the use of structural features, non-             dredged material obtained from the con-                ervoirs due to sediment accumulation, if the
                                              structural features, or natural features or             struction or operation and maintenance of              project also has a purpose described in any of
                                              nature-based features (as those terms are de-           water resources development projects.                  paragraphs (1) through (7).’’;
                                              fined in section 1184(a) of the Water Re-                 (2) PLACEMENT OF DREDGED MATERIALS.—                    (B) in subsection (b)(1), by striking ‘‘20’’
                                              sources Development Act of 2016 (33 U.S.C.                (A) IN GENERAL.—In evaluating the place-             and inserting ‘‘35’’; and
                                              2289a(a)), could improve the sustainable op-            ment of dredged material obtained from the                (C) in subsection (g), by striking ‘‘20’’ and
                                              erations of the project, or reduce operation            construction or operation and maintenance              inserting ‘‘35’’.
                                              and maintenance costs for the project; or               of water resources development projects, the              (2) SENSE OF CONGRESS.—It is the sense of
                                                ‘‘(3) that are no longer having project pur-          Secretary shall consider—                              Congress that the Secretary, in selecting
                                              poses adequately met by the Corps of Engi-                (i) the suitability of the dredged material          projects for the beneficial use of dredged ma-
                                              neers, because of deferment of maintenance              for a full range of beneficial uses; and               terials under section 1122 of the Water Re-
                                              or other challenges, and the divestment of                (ii) the economic and environmental bene-            sources Development Act of 2016 (33 U.S.C.
                                              which to a non-Federal entity could better              fits, efficiencies, and impacts (including the         2326 note), should ensure the thorough eval-
                                              meet the local and regional needs for oper-             effects on living coral) of using the dredged          uation of project submissions from rural,
                                              ation and maintenance.                                  material for beneficial uses, including, in the        small, and economically disadvantaged com-
                                                ‘‘(c) CRITERIA.—In conducting the assess-             case of beneficial use activities that involve         munities.
                                              ment under subsection (a) and developing the            more than one water resources development                 (3)    PROJECT    SELECTION.—In       selecting
                                              inventory under subsection (b), the Sec-                project, the benefits, efficiencies, and im-           projects for the beneficial use of dredged ma-
                                              retary shall use the following criteria:                pacts that result from the combined activi-            terials under section 1122 of the Water Re-
                                                ‘‘(1) The extent to which the project aligns          ties.                                                  sources Development Act of 2016 (33 U.S.C.
                                              with the current missions of the Corps of En-             (B) CALCULATION OF FEDERAL STANDARD.—                2326 note), the Secretary shall prioritize the
                                              gineers.                                                  (i) DETERMINATION.—The economic benefits             selection of at least one project for the utili-
                                                ‘‘(2) The economic and environmental im-              and efficiencies from the beneficial use of            zation of thin layer placement of dredged
                                              pacts of the project on existing communities            dredged material considered by the Sec-                fine and coarse grain sediment and at least
                                              in the vicinity of the project.                         retary under subparagraph (A) shall be in-             one project for recovering lost storage capac-
                                                ‘‘(3) The extent to which the divestment or           cluded in any determination relating to the            ity in reservoirs due to sediment accumula-
                                              modification of the project could reduce op-            ‘‘Federal standard’’ by the Secretary under            tion authorized by subsection (a)(8) of such
                                              eration and maintenance costs of the Corps              section 335.7 of title 33, Code of Federal Reg-        section, to the extent that a non-Federal in-
                                              of Engineers.                                           ulations, for the placement or disposal of             terest has submitted an application for such
                                                ‘‘(4) The extent to which the divestment or           such material.                                         project purposes that otherwise meets the
                                              modification of the project is in the public              (ii) REPORTS.—The Secretary shall submit             requirements of such section.
                                              interest.                                               to Congress—                                              (4) TEMPORARY EASEMENTS.—Section 1148 of
                                                ‘‘(5) The extent to which investment of ad-             (I) a report detailing the method and all of         the Water Resources Development Act of
                                              ditional Federal resources in the project pro-          the factors utilized by the Corps of Engineers         2018 (33 U.S.C. 2326 note) is amended—
                                              posed for divestment or modification, includ-           to determine the Federal standard referred                (A) in subsection (a)—
                                              ing investment needed to bring the project              to in clause (i); and                                     (i) by striking ‘‘grant’’ and inserting ‘‘ap-
                                              to a good state of repair, is in the public in-           (II) for each evaluation under subpara-              prove’’; and
                                              terest.                                                 graph (A), a report displaying the calcula-               (ii) by striking ‘‘granting’’ and inserting
                                                ‘‘(6) The extent to which the authorized              tions for economic and environmental bene-             ‘‘approving’’; and
                                              purpose of the project is no longer being met.          fits and efficiencies from the beneficial use             (B) in subsection (b), by striking ‘‘grants’’
                                                ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL                  of dredged material (including, where appro-           and inserting ‘‘approves’’.
                                              INTERESTS.—A non-Federal interest for a                 priate, the utilization of alternative dredg-             (c) FIVE-YEAR REGIONAL DREDGED MATE-
                                              project may recommend that the Secretary                ing equipment and dredging disposal meth-              RIAL MANAGEMENT PLANS.—
                                              include such project in the assessment or in-           ods) considered by the Secretary under such               (1) IN GENERAL.—Not later than 1 year after
                                              ventory required under this section.                    subparagraph for the placement or disposal             the date of enactment of this Act, and annu-
                                                ‘‘(e) REPORT TO CONGRESS.—                            of such material.                                      ally thereafter, the District Commander of
                                                ‘‘(1) IN GENERAL.—Upon completion of the                (C) SELECTION OF DREDGED MATERIAL DIS-               each district of the Corps of Engineers that
                                              inventory required by subsection (b), the               POSAL METHOD FOR CERTAIN PURPOSES.—Sec-                obtains dredged material through the con-
                                              Secretary shall submit to the Committee on              tion 204(d) of the Water Resources Develop-            struction or operation and maintenance of a
                                              Environment and Public Works of the Senate              ment Act of 1992 (33 U.S.C. 2326(d)) is amend-         water resources development project shall,
                                              and the Committee on Transportation and                 ed—                                                    at Federal expense, develop and submit to
                                              Infrastructure of the House of Representa-                (i) in paragraph (1)—                                the Secretary a 5-year dredged material
                                              tives, and make publicly available, a report              (I) in the matter preceding subparagraph             management plan in coordination with rel-
                                              containing the findings of the Secretary with           (A), by striking ‘‘In developing’’ and all that        evant State agencies and stakeholders.




SSpencer on DSK126QN23PROD with HOUSE
                                              respect to the assessment and inventory re-             follows through ‘‘the non-Federal interest,’’             (2) SCOPE.—Each plan developed under this
                                              quired under this section.                              and inserting ‘‘At the request of the non-             subsection shall include—
                                                ‘‘(2) INCLUSION.—The Secretary shall list in          Federal interest for a water resources devel-             (A) a dredged material budget for each wa-
                                              an appendix any recommendation of a non-                opment project involving the disposal of               tershed or littoral system within the dis-
                                              Federal interest made with respect to a                 dredged material, the Secretary, using funds           trict;
                                              project under subsection (d) that the Sec-              appropriated for construction or operation                (B) an estimate of the amount of dredged
                                              retary determines not to include in the in-             and maintenance of the project, may select’’;          material likely to be obtained through the
                                              ventory developed under subsection (b),                 and                                                    construction or operation and maintenance




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00036   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6943
                                              of all water resources development projects             tion with Federal regional dredge dem-                    ‘‘(VII) section 206 of the Water Resources
                                              projected to be carried out within the dis-             onstration programs in effect on the date of           Development Act of 1996 (33 U.S.C. 2330);
                                              trict during the 5-year period following sub-           enactment of this Act.                                    ‘‘(VIII) section 2 of the Act of August 28,
                                              mission of the plan, and the estimated tim-             SEC. 126. AQUATIC ECOSYSTEM RESTORATION                1937 (33 U.S.C. 701g); and
                                              ing for obtaining such dredged material;                           FOR ANADROMOUS FISH.                           ‘‘(IX) section 1135 of the Water Resources
                                                (C) an identification of potential water re-            (a) ANADROMOUS FISH HABITAT AND PAS-                 Development Act of 1986 (33 U.S.C. 2309a).’’;
                                              sources development projects projected to be            SAGE.—Section 206 of the Water Resources               and
                                              carried out within the district during such 5-          Development Act of 1996 (33 U.S.C. 2330) is               (B) in paragraph (4)(B)—
                                              year period that are suitable for, or that re-          amended—                                                  (i) in clause (i), by striking ‘‘and’’ at the
                                              quire, the placement of dredged material,                 (1) in subsection (a), by adding at the end          end;
                                              and an estimate of the amount of dredged                the following:                                            (ii) by redesignating clause (ii) as clause
                                              material placement capacity of such                       ‘‘(3) ANADROMOUS FISH HABITAT AND PAS-               (iii); and
                                              projects;                                               SAGE.—                                                    (iii) by inserting after clause (i) the fol-
                                                (D) an evaluation of—                                   ‘‘(A) MEASURES.—A project under this sec-            lowing:
                                                (i) the suitability of the dredged material           tion may include measures to improve habi-                ‘‘(ii) the Secretary shall not include pro-
                                              for a full range of beneficial uses; and                tat or passage for anadromous fish, includ-            posals in the appendix of the annual report
                                                (ii) the economic and environmental bene-             ing—                                                   that otherwise meet the criteria for inclu-
                                              fits, efficiencies, and impacts (including the            ‘‘(i) installing fish bypass structures on           sion in the annual report solely on the basis
                                              effects on living coral) of using the dredged           small water diversions;                                that the proposals are for the purposes of
                                              material for beneficial uses, including, in the           ‘‘(ii) modifying tide gates; and                     navigation, flood risk management, eco-
                                              case of beneficial use activities that involve            ‘‘(iii) restoring or reconnecting floodplains        system restoration, or municipal or agricul-
                                              more than one water resources development               and wetlands that are important for anad-              tural water supply; and’’; and
                                              project, the benefits, efficiencies, and im-            romous fish habitat or passage.                           (2) in subsection (g)(5), by striking ‘‘if au-
                                              pacts that result from the combined activi-               ‘‘(B) BENEFITS.—A project that includes              thorized’’ and all that follows through
                                              ties;                                                   measures under this paragraph shall be for-            ‘‘2016’’.
                                                (E) the district-wide goals for beneficial            mulated to maximize benefits for the anad-                (b) OVER-BUDGET CAP PROGRAMS.—For any
                                              use of the dredged material, including any              romous fish species benefitted by the                  project carried out under a continuing au-
                                              expected cost savings from aligning and co-             project.’’; and                                        thority program, as such term is defined in
                                              ordinating multiple projects (including                   (2) by adding at the end the following:              section 7001(c)(1)(D) of the Water Resources
                                              projects across Corps districts) in the use of            ‘‘(g) PRIORITIZATION.—The Secretary shall            Reform and Development Act of 2014 (33
                                              the dredged material; and                               give projects that include measures de-                U.S.C. 2282d)), for which the Secretary is re-
                                                (F) a description of potential beneficial use         scribed in subsection (a)(3) equal priority for        quired to include a proposed modification in
                                              projects identified through stakeholder so-             implementation as other projects under this            an annual report under such section
                                              licitation and coordination.                            section.’’.                                            7001(c)(1)(D), the Secretary shall, to the ex-
                                                (3) PUBLIC COMMENT.—In developing each                SEC. 127. ANNUAL REPORT TO CONGRESS ON                 tent practicable, inform the non-Federal in-
                                              plan under this subsection, each District                          WATER RESOURCES INFRASTRUC-
                                                                                                                                                             terest of the process for carrying out the
                                              Commander shall provide notice and an op-                          TURE.
                                                                                                                                                             project pursuant to section 105 of the Water
                                              portunity for public comment, including a                 (a) IN GENERAL.—Section 7001 of the Water
                                                                                                                                                             Resources Development Act of 1986 (33 U.S.C.
                                              solicitation for stakeholders to identify ben-          Resources Reform and Development Act of
                                                                                                                                                             2215) and whether the Secretary has the au-
                                              eficial use projects, in order to ensure, to the        2014 (33 U.S.C. 2282d) is amended—
                                                                                                                                                             thority to complete a feasibility study for
                                              extent practicable, that beneficial use of                 (1) in subsection (c)—
                                                                                                                                                             the project.
                                              dredged material is not foregone in a par-                 (A) in paragraph (1)—                                  (c) ANNUAL REPORT ON STATUS OF FEASI-
                                              ticular fiscal year or dredging cycle.                     (i) in subparagraph (B)(ii)(III), by inserting      BILITY STUDIES.—Concurrent with each re-
                                                (4) PUBLIC AVAILABILITY.—Upon submission              ‘‘, regional, or local’’ after ‘‘national’’; and       port submitted under section 7001 of the
                                              of each plan to the Secretary under this sub-              (ii) by adding at the end the following:            Water Resources Reform and Development
                                              section, each District Commander shall                     ‘‘(D) MODIFICATIONS OF PROJECTS CARRIED             Act of 2014 (33 U.S.C. 2282d), the Secretary
                                              make the plan publicly available, including             OUT PURSUANT TO CONTINUING AUTHORITY PRO-              shall submit to the Committee on Transpor-
                                              on a publicly available website.                        GRAMS.—                                                tation and Infrastructure of the House of
                                                (5) TRANSMISSION TO CONGRESS.—As soon as                 ‘‘(i) IN GENERAL.—With respect to a project         Representatives and the Committee on Envi-
                                              practicable after receiving a plan under sub-           being carried out pursuant to a continuing             ronment and Public Works of the Senate a
                                              section (a), the Secretary shall transmit the           authority program for which a proposed                 report that provides for an accounting of all
                                              plan to Congress.                                       modification is necessary because the                  outstanding feasibility studies being con-
                                                (6)    REGIONAL      SEDIMENT    MANAGEMENT           project is projected to exceed, in the coming          ducted by the Secretary, including, for each
                                              PLANS.—A plan developed under this sec-                 fiscal year, the maximum Federal cost of the           such study, its length, cost, and expected
                                              tion—                                                   project, the Secretary shall include a pro-            completion date.
                                                (A) shall be in addition to regional sedi-            posed modification in the annual report if             SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRA-
                                              ment management plans prepared under sec-               the proposed modification will result in com-                      TION PROGRAM.
                                              tion 204(a) of the Water Resources Develop-             pletion of construction the project and the              (a) IN GENERAL.—The Secretary shall carry
                                              ment Act of 1992 (33 U.S.C. 2326(a)); and               justification for the modification is not the          out a demonstration program to determine
                                                (B) shall not be subject to the limitations           result of a change in the scope of the project.        the causes of, and implement measures to ef-
                                              in section 204(g) of the Water Resources De-               ‘‘(ii) INCLUSION.—For each proposed modi-           fectively detect, prevent, treat, and elimi-
                                              velopment Act of 1992 (33 U.S.C. 2326(g)).              fication included in an annual report under            nate, harmful algal blooms associated with
                                                (d) DREDGE PILOT PROGRAM.—                            clause (i), the Secretary shall include in the         water resources development projects.
                                                (1) REVISIONS.—Section 1111 of the Water              annual report—                                           (b) CONSULTATION; USE OF EXISTING DATA
                                              Resources Development Act of 2018 (33 U.S.C.               ‘‘(I) a justification of why the modification       AND PROGRAM AUTHORITIES.—In carrying out
                                              2326 note) is amended—                                  is necessary;                                          the demonstration program under subsection
                                                (A) in subsection (a), by striking ‘‘for the             ‘‘(II) an estimate of the total cost and            (a), the Secretary shall—
                                              operation and maintenance of harbors and                timeline required to complete construction               (1) consult with the heads of appropriate
                                              inland harbors’’ and all that follows through           of the project; and                                    Federal and State agencies; and
                                              the period at the end and inserting the fol-               ‘‘(III) an indication of continued support            (2) make maximum use of existing Federal
                                              lowing: ‘‘for the operation and maintenance             by the non-Federal interest and the financial          and State data and ongoing programs and ac-
                                              of—                                                     ability of the non-Federal interest to provide         tivities of Federal and State agencies, in-
                                                ‘‘(1) harbors and inland harbors referred to          the required cost-share.                               cluding the activities of the Secretary car-
                                              in section 210(a)(2) of the Water Resources                ‘‘(iii) DEFINITION.—For the purposes of this        ried out through the Engineer Research and
                                              Development Act of 1986 (33 U.S.C. 2238(a)(2));         subparagraph, the term ‘continuing author-             Development Center pursuant to section 1109
                                              or                                                      ity program’ means any of—                             of the Water Resources Development Act of
                                                ‘‘(2) inland and intracoastal waterways of               ‘‘(I) section 14 of the Flood Control Act of        2018 (33 U.S.C. 610 note).
                                              the United States described in section 206 of           1946 (33 U.S.C. 701r);                                   (c) FOCUS AREAS.—In carrying out the dem-
                                              the Inland Waterways Revenue Act of 1978                   ‘‘(II) section 3 of the Act of August 13, 1946      onstration program under subsection (a), the
                                              (33 U.S.C. 1804).’’; and                                (33 U.S.C. 426g);                                      Secretary shall undertake program activi-




SSpencer on DSK126QN23PROD with HOUSE
                                                (B) in subsection (b), by striking ‘‘or inland           ‘‘(III) section 107 of the River and Harbor         ties related to harmful algal blooms in the
                                              harbors’’ and inserting ‘‘, inland harbors, or          Act of 1960 (33 U.S.C. 577);                           Great Lakes, the tidal and inland waters of
                                              inland or intracoastal waterways’’.                        ‘‘(IV) section 111 of the River and Harbor          the State of New Jersey, the coastal and
                                                (2) COORDINATION WITH EXISTING AUTHORI-               Act of 1968 (33 U.S.C. 426i);                          tidal waters of the State of Louisiana, the
                                              TIES.—The Secretary may carry out the                      ‘‘(V) section 204 of the Water Resources De-        waterways of the counties that comprise the
                                              dredge pilot program authorized by section              velopment Act of 1992 (33 U.S.C. 2326);                Sacramento-San Joaquin Delta, California,
                                              1111 of the Water Resources Development                    ‘‘(VI) section 205 of the Flood Control Act         the Allegheny Reservoir Watershed, New
                                              Act of 2018 (33 U.S.C. 2326 note) in coordina-          of 1948 (33 U.S.C. 701s);                              York, and Lake Okeechobee, Florida.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00037   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6944                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                                (d) ADDITIONAL FOCUS AREAS.—In addition               sources development project, and to provide               (ii) by striking clause (iv) and inserting the
                                              to the areas described in subsection (c), in            reimbursement to such non-Federal interest             following:
                                              carrying out the demonstration program                  or private entity for such materials, serv-               ‘‘(iv) fails to meet minimum dam safety
                                              under subsection (a), the Secretary shall un-           ices, and funds, in the Secretary’s sole dis-          standards of the State in which the dam is
                                              dertake program activities related to harm-             cretion, and subject to the availability of ap-        located, as determined by the State; and
                                              ful algal blooms at any Federal reservoir lo-           propriations, if the Secretary determines                 ‘‘(v) poses an unacceptable risk to the pub-
                                              cated in the Upper Missouri River Basin or              that reimbursement is in the public interest.          lic, as determined by the Administrator, in
                                              the North Platte River Basin, at the request              (c) ADDITIONAL REQUIREMENT.—The Sec-                 consultation with the Board.’’; and
                                              and expense of another Federal agency.                  retary may only reimburse for the use of ma-              (B) in subparagraph (B)(i), by inserting
                                                (e) AUTHORIZATION OF APPROPRIATIONS.—                 terials or services accepted under this sec-           ‘‘under a hydropower project with an author-
                                              There is authorized to be appropriated to the           tion if such materials or services meet the            ized installed capacity of greater than 1.5
                                              Secretary $25,000,000 to carry out this sec-            Secretary’s specifications and comply with             megawatts’’ after ‘‘dam’’; and
                                              tion. Such sums shall remain available until            all applicable laws and regulations that                  (2) in paragraph (10)—
                                              expended.                                               would apply if such materials and services                (A) in the heading, by striking ‘‘NON-FED-
                                              SEC.   129.
                                                        MISSOURI RIVER INTERCEPTION-                  were acquired by the Secretary, including              ERAL SPONSOR’’ and inserting ‘‘ELIGIBLE SUB-
                                                        REARING COMPLEX CONSTRUCTION.                 sections 3141 through 3148 and 3701 through            RECIPIENT’’; and
                                                (a) REPORT.—Not later than 1 year after               3708 of title 40, United States Code, section             (B) by striking ‘‘The term ‘non-Federal
                                              the date of enactment of this Act, and annu-            8302 of title 41, United States Code, and the          sponsor’ ’’ and inserting ‘‘The term ‘eligible
                                              ally thereafter, the Secretary shall submit             National Environmental Policy Act of 1969.             subrecipient’ ’’.
                                              to the Committee on Transportation and In-                (d) AGREEMENTS.—                                        (b) REHABILITATION OF HIGH HAZARD POTEN-
                                              frastructure of the House of Representatives              (1) IN GENERAL.—Prior to the acceptance of           TIAL DAMS.—
                                              and the Committee on Environment and                    materials, services, or funds under this sec-             (1) ESTABLISHMENT OF PROGRAM.—Section
                                              Public Works of the Senate a report on the              tion, the Secretary and the non-Federal in-            8A(a) of the National Dam Safety Program
                                              effects of any interception-rearing complex             terest or private entity shall enter into an           Act (33 U.S.C. 467f–2(a)) is amended by strik-
                                              constructed on the Missouri River on—                   agreement that specifies—                              ing ‘‘to non-Federal sponsors’’ and inserting
                                                (1) flood risk management and navigation;               (A) the non-Federal interest or private en-          ‘‘to States with dam safety programs’’.
                                              and                                                     tity shall hold and save the United States                (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of
                                                (2) the population recovery of the pallid             free from any and all damages that arise               the National Dam Safety Program Act (33
                                              sturgeon, including baseline population                 from use of materials or services of the non-          U.S.C. 467f–2(b)) is amended, in the matter
                                              counts.                                                 Federal interest or private entity, except for         preceding paragraph (1), by striking ‘‘for a
                                                (b) NO ADDITIONAL IRC CONSTRUCTION.—                  damages due to the fault or negligence of the          project may be used for’’ and inserting ‘‘to a
                                              The Secretary may not authorize construc-               United States or its contractors;                      State may be used by the State to award
                                              tion of an interception-rearing complex on                (B) the non-Federal interest or private en-          grants to eligible subrecipients for’’.
                                              the Missouri River until the Secretary—                                                                           (3) AWARD OF GRANTS.—Section 8A(c) of the
                                                                                                      tity shall certify that the materials or serv-
                                                (1) submits the report required by sub-                                                                      National Dam Safety Program Act (33 U.S.C.
                                                                                                      ices comply with all applicable laws and reg-
                                              section (a);                                                                                                   467f–2(c)) is amended—
                                                                                                      ulations under subsection (c); and
                                                (2) acting through the Engineer Research                                                                        (A) in paragraph (1)(A), by striking ‘‘non-
                                                                                                        (C) any other term or condition required
                                              and Development Center, conducts further                                                                       Federal sponsor’’ and inserting ‘‘State’’; and
                                                                                                      by the Secretary.
                                              research on interception-rearing complex de-                                                                      (B) in paragraph (2)—
                                                                                                        (2) EXCEPTION.—If an agreement under
                                              sign, including any effects on existing flows,                                                                    (i) in subparagraph (A), by striking ‘‘an eli-
                                                                                                      paragraph (1) was not entered prior to mate-
                                              flood risk management, and navigation; and                                                                     gible high hazard potential dam to a non-
                                                                                                      rials or services being contributed, a non-
                                                (3) develops a plan—                                                                                         Federal sponsor’’ and inserting ‘‘eligible high
                                                                                                      Federal interest or private entity shall enter
                                                (A) to repair dikes and revetments that are                                                                  hazard potential dams to a State’’;
                                                                                                      into an agreement with the Secretary that—
                                              affecting flood risk and bank erosion; and                                                                        (ii) in subparagraph (B)—
                                                                                                        (A) specifies the value, as determined by               (I) in the subparagraph heading, by strik-
                                                (B) to establish, repair, or improve water            the Secretary, of those materials or services
                                              control structures at the headworks of con-                                                                    ing      ‘‘PROJECT    GRANT’’    and    inserting
                                                                                                      contributed and eligible for reimbursement;            ‘‘GRANT’’;
                                              structed shallow water habitat side-chan-               and
                                              nels.                                                                                                             (II) by striking ‘‘project grant agreement
                                                                                                        (B) ensures that the materials or services           with the non-Federal sponsor’’ and inserting
                                                (c) FUTURE IRC CONSTRUCTION.—                         comply with subsection (c) and paragraph
                                                (1) PUBLIC COMMENT.—The Secretary shall                                                                      ‘‘grant agreement with the State’’; and
                                                                                                      (1).                                                      (III) by striking ‘‘project,’’ and inserting
                                              provide an opportunity for comment from
                                                                                                      SEC. 131. LEVEE SAFETY.                                ‘‘projects for which the grant is awarded,’’;
                                              the public and the Governor of each affected
                                                                                                        Section 9004 of the Water Resources Devel-              (iii) by amending subparagraph (C) to read
                                              State on any proposals to construct an inter-
                                                                                                      opment Act of 2007 (33 U.S.C. 3303) is amend-          as follows:
                                              ception-rearing complex after the date of en-
                                                                                                      ed by adding at the end the following:                    ‘‘(C) GRANT ASSURANCE.—As part of a grant
                                              actment of this Act.
                                                                                                        ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—               agreement under subparagraph (B), the Ad-
                                                (2) PERIOD.—The public comment period re-
                                                                                                        ‘‘(1) IN GENERAL.—For each levee included            ministrator shall require that each eligible
                                              quired by paragraph (1) shall be not less than
                                                                                                      in an inventory established under subsection           subrecipient to which the State awards a
                                              90 days for each proposal to construct an
                                                                                                      (b) or for which the Secretary has conducted           grant under this section provides an assur-
                                              interception-rearing complex on the Mis-
                                                                                                      a review under subsection (c), the Secretary           ance, with respect to the dam to be rehabili-
                                              souri River.
                                                                                                      shall—                                                 tated by the eligible subrecipient, that the
                                              SEC. 130. MATERIALS, SERVICES, AND FUNDS FOR
                                                          REPAIR, RESTORATION, OR REHA-
                                                                                                        ‘‘(A) identify the specific engineering and          dam owner will carry out a plan for mainte-
                                                          BILITATION OF PROJECTS.                     maintenance deficiencies, if any; and                  nance of the dam during the expected life of
                                                (a) DEFINITIONS.—In this section:                       ‘‘(B) describe the recommended remedies              the dam.’’; and
                                                (1) COVERED AREA.—The term ‘‘covered                  to correct each deficiency identified under               (iv) in subparagraph (D), by striking ‘‘A
                                              area’’ means an area—                                   subparagraph (A), and, if requested by owner           grant provided under this section shall not
                                                (A) for which the Governor of a State has             of a non-Federal levee, the associated costs           exceed’’ and inserting ‘‘A State may not
                                              requested a determination that an emer-                 of those remedies.                                     award a grant to an eligible subrecipient
                                              gency exists; or                                          ‘‘(2) CONSULTATION.—In identifying defi-             under this section that exceeds, for any 1
                                                (B) covered by an emergency or major dis-             ciencies and describing remedies for a levee           dam,’’.
                                              aster declaration declared under the Robert             under paragraph (1), the Secretary shall con-             (4) REQUIREMENTS.—Section 8A(d) of the
                                              T. Stafford Disaster Relief and Emergency               sult with relevant non-Federal interests, in-          National Dam Safety Program Act (33 U.S.C.
                                              Assistance Act (42 U.S.C. 5121 et seq.).                cluding by providing an opportunity for com-           467f–2(d)) is amended—
                                                (2) EMERGENCY PERIOD.—The term ‘‘emer-                ment by those non-Federal interests.’’.                   (A) in paragraph (1), by inserting ‘‘to an el-
                                              gency period’’ means—                                   SEC. 132. NATIONAL DAM SAFETY PROGRAM.                 igible subrecipient’’ after ‘‘this section’’;
                                                (A) with respect to a covered area de-                  (a) DEFINITIONS.—Section 2 of the National              (B) in paragraph (2)—
                                              scribed in paragraph (1)(A), the period during          Dam Safety Program Act (33 U.S.C. 467) is                 (i) in the paragraph heading, by striking
                                              which the Secretary determines an emer-                 amended—                                               ‘‘NON-FEDERAL SPONSOR’’ and inserting ‘‘ELI-
                                              gency exists; and                                         (1) in paragraph (4)—                                GIBLE SUBRECIPIENT’’;
                                                (B) with respect to a covered area de-                  (A) in subparagraph (A)—                                (ii) in the matter preceding subparagraph




SSpencer on DSK126QN23PROD with HOUSE
                                              scribed in paragraph (1)(B), the period during            (i) by striking clause (iii) and inserting the       (A), by striking ‘‘the non-Federal sponsor
                                              which the applicable declaration is in effect.          following:                                             shall’’ and inserting ‘‘an eligible sub-
                                                (b) IN GENERAL.—In any covered area, the                ‘‘(iii) has an emergency action plan that—           recipient shall, with respect to the dam to be
                                              Secretary is authorized to accept and use                 ‘‘(I) is approved by the relevant State dam          rehabilitated by the eligible subrecipient’’;
                                              materials, services, and funds, during the              safety agency; or                                         (iii) by amending subparagraph (A) to read
                                              emergency period, from a non-Federal inter-               ‘‘(II) is in conformance with State law and          as follows:
                                              est or private entity to repair, restore, or re-        pending approval by the relevant State dam                ‘‘(A) demonstrate that the community in
                                              habilitate a federally authorized water re-             safety agency;’’; and                                  which the dam is located participates in, and




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00038   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6945
                                              complies with, all applicable Federal flood             station, if the Secretary determines that the          sources Development Act of 2000, in accord-
                                              insurance      programs,     including     dem-         rehabilitation is feasible.                            ance with such section 1043(b).
                                              onstrating that such community is partici-                (c) COST SHARING.—The non-Federal inter-               (2) ELIGIBILITY.—In the case of a project de-
                                              pating in the National Flood Insurance Pro-             est for the eligible pump station shall—               scribed in paragraph (1) for which the non-
                                              gram, and is not on probation, suspended, or              (1) provide 35 percent of the cost of reha-          Federal interest has initiated construction
                                              withdrawn from such Program;’’;                         bilitation of an eligible pump station carried         in compliance with authorities governing the
                                                 (iv) in subparagraph (B), by striking                out under this section; and                            provision of in-kind contributions for such
                                              ‘‘have’’ and inserting ‘‘beginning not later              (2) provide all land, easements, rights-of-          project, the Secretary shall take into ac-
                                              than 2 years after the date on which the Ad-            way, and necessary relocations associated              count the value of any in-kind contributions
                                              ministrator publishes criteria for hazard               with the rehabilitation described in subpara-          carried out by the non-Federal interest for
                                              mitigation plans under paragraph (3), dem-              graph (A), at no cost to the Federal Govern-           such project prior to the date of execution of
                                              onstrate that the Tribal or local government            ment.                                                  the project partnership agreement under sec-
                                              with jurisdiction over the area in which the              (d) AGREEMENT REQUIRED.—The rehabilita-              tion 1043(b) of the Water Resources Reform
                                              dam is located has’’; and                               tion of an eligible pump station pursuant to           and Development Act of 2014 when deter-
                                                 (v) in subparagraph (C), by striking ‘‘50-           this section shall be initiated only after a           mining the non-Federal share of the costs to
                                              year period’’ and inserting ‘‘expected life of          non-Federal interest has entered into a bind-          complete construction of the project.
                                              the dam’’; and                                          ing agreement with the Secretary—                        (3) GUIDANCE.—Not later than 180 days
                                                 (C) by adding at the end the following:                (1) to pay the non-Federal share of the              after the date of enactment of this sub-
                                                 ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—              costs of rehabilitation under subsection (c);          section, and in accordance with the guidance
                                              Not later than 1 year after the date of enact-          and                                                    issued under section 1043(b)(9) of the Water
                                              ment of this paragraph, the Administrator,                (2) to pay 100 percent of the operation and          Resources Reform and Development Act of
                                              in consultation with the Board, shall publish           maintenance costs of the rehabilitated eligi-          2014 (as added by this section), the Secretary
                                              criteria for hazard mitigation plans required           ble pump station, in accordance with regula-           shall issue any additional guidance that the
                                              under paragraph (2)(B).’’.                              tions promulgated by the Secretary.                    Secretary determines necessary for the im-
                                                 (5) FLOODPLAIN MANAGEMENT PLANS.—Sec-                  (e) TREATMENT.—The rehabilitation of an              plementation of this subsection.
                                              tion 8A(e) of the National Dam Safety Pro-              eligible pump station pursuant to this sec-            SEC. 135. COST SHARING PROVISIONS FOR TERRI-
                                              gram Act (33 U.S.C. 467f–2(e)) is amended—              tion shall not be considered to be a separable                     TORIES AND INDIAN TRIBES.
                                                 (A) in paragraph (1)—                                element of the associated flood risk manage-             Section 1156(b) of the Water Resources De-
                                                 (i) in the matter preceding subparagraph             ment project constructed by the Corps of En-           velopment Act of 1986 (33 U.S.C. 2310(b)) is
                                              (A), by striking ‘‘the non-Federal sponsor’’            gineers.                                               amended by striking ‘‘for inflation’’ and all
                                              and inserting ‘‘an eligible subrecipient’’; and           (f) AUTHORIZATION OF APPROPRIATIONS.—                that follows through the period at the end
                                                 (ii) in subparagraph (B), by striking ‘‘1            There is authorized to be appropriated to              and inserting ‘‘on an annual basis for infla-
                                              year’’ and inserting ‘‘2 years’’ each place it          carry out this section $60,000,000, to remain          tion.’’.
                                              appears; and                                            available until expended.                              SEC. 136. REVIEW OF CONTRACTING POLICIES.
                                                 (B) by striking paragraph (3) and inserting          SEC. 134. NON-FEDERAL PROJECT IMPLEMENTA-
                                                                                                                                                               (a) REVIEW OF CONTRACTUAL AGREE-
                                              the following:                                                      TION PILOT PROGRAM.
                                                                                                                                                             MENTS.—
                                                 ‘‘(3) PLAN CRITERIA AND TECHNICAL SUP-                 (a)   REAUTHORIZATION;    IMPLEMENTATION
                                                                                                                                                               (1) IN GENERAL.—Not later than 180 days
                                              PORT.—The Administrator, in consultation                GUIDANCE.—Section 1043(b) of the Water Re-
                                                                                                                                                             after the date of enactment of this section,
                                              with the Board, shall provide criteria, and             sources Reform and Development Act of 2014
                                                                                                                                                             the Secretary shall complete a review of the
                                              may provide technical support, for the devel-           (33 U.S.C. 2201 note) is amended—
                                                                                                                                                             policies, guidelines, and regulations of the
                                              opment and implementation of floodplain                   (1) in paragraph (7), by striking ‘‘the date
                                                                                                                                                             Corps of Engineers for the development of
                                              management plans prepared under this sub-               that is 5 years after the date of enactment of
                                                                                                                                                             contractual agreements between the Sec-
                                              section.’’.                                             this Act’’ and inserting ‘‘September 30, 2026’’;
                                                                                                                                                             retary and non-Federal interests and utili-
                                                 (6) CONTRACTUAL REQUIREMENTS.—Section                  (2) in paragraph (8), by striking ‘‘2023’’ and
                                                                                                                                                             ties associated with the construction of
                                              8A(i)(1) of the National Dam Safety Program             inserting ‘‘2026’’; and
                                                                                                                                                             water resources development projects.
                                              Act (33 U.S.C. 467f–2(i)(1)) is amended by                (3) by adding at the end the following:
                                                                                                                                                               (2) REPORT.—Not later than 90 days after
                                              striking ‘‘a non-Federal sponsor’’ and insert-            ‘‘(9) IMPLEMENTATION GUIDANCE.—
                                                                                                                                                             completing the review under subsection
                                              ing ‘‘an eligible subrecipient’’.                         ‘‘(A) IN GENERAL.—Not later than 120 days
                                                                                                                                                             (a)(1), the Secretary shall submit to the
                                              SEC. 133. REHABILITATION OF CORPS OF ENGI-              after the date of enactment of this para-
                                                                                                                                                             Committee on Transportation and Infra-
                                                          NEERS CONSTRUCTED PUMP STA-                 graph, the Secretary shall issue guidance for
                                                                                                                                                             structure of the House of Representatives
                                                          TIONS.                                      the implementation of the pilot program
                                                                                                                                                             and the Committee on Environment and
                                                (a) DEFINITIONS.—In this section:                     that, to the extent practicable, identifies—
                                                                                                                                                             Public Works of the Senate, and make pub-
                                                (1) ELIGIBLE PUMP STATION.—The term ‘‘eli-              ‘‘(i) the metrics for measuring the success
                                                                                                                                                             licly available, a report that includes—
                                              gible pump station’’ means a pump station—              of the pilot program;
                                                                                                                                                               (A) a summary of the results of the review;
                                                 (A) constructed, in whole or in part, by the           ‘‘(ii) a process for identifying future
                                                                                                                                                             and
                                              Corps of Engineers for flood risk manage-               projects to participate in the pilot program;
                                                                                                                                                               (B) public guidance on best practices for a
                                              ment purposes;                                            ‘‘(iii) measures to address the risks of a
                                                                                                                                                             non-Federal interest to use when writing or
                                                 (B) that the Secretary has identified as             non-Federal interest constructing projects
                                                                                                                                                             developing contractual agreements with the
                                              having a major deficiency; and                          under the pilot program, including which en-
                                                                                                                                                             Secretary and utilities.
                                                 (C) the failure of which the Secretary has           tity bears the risk for projects that fail to
                                                                                                                                                               (3) PROVISION OF GUIDANCE.—The Secretary
                                              determined would impair the function of a               meet the Corps of Engineers standards for
                                                                                                                                                             shall provide the best practices guidance in-
                                              flood risk management project constructed               design or quality;
                                                                                                                                                             cluded under paragraph (2)(A) to non-Federal
                                              by the Corps of Engineers.                                ‘‘(iv) the laws and regulations that a non-
                                                                                                                                                             interests prior to the development of con-
                                                 (2) REHABILITATION.—                                 Federal interest must follow in carrying out
                                                                                                                                                             tractual agreements with such non-Federal
                                                 (A) IN GENERAL.—The term ‘‘rehabilita-               a project under the pilot program; and
                                                                                                                                                             interests.
                                              tion’’, with respect to an eligible pump sta-             ‘‘(v) which entity bears the risk in the               (b) SENSE OF CONGRESS.—It is the sense of
                                              tion, means to address a major deficiency of            event that a project carried out under the             Congress that the Secretary should maxi-
                                              the eligible pump station caused by long-               pilot program fails to be carried out in ac-           mize use of nonprice tradeoff procedures in
                                              term degradation of the foundation, con-                cordance with the project authorization or             competitive acquisitions for carrying out
                                              struction materials, or engineering systems             this subsection.                                       emergency work in an area with respect to
                                              or components of the eligible pump station.               ‘‘(B) NEW PROJECT PARTNERSHIP AGREE-                 which the President has declared a major
                                                 (B) INCLUSIONS.—The term ‘‘rehabilita-               MENTS.—The Secretary may not enter into a              disaster under section 401 of the Robert T.
                                              tion’’, with respect to an eligible pump sta-           project partnership agreement under this               Stafford Disaster Relief and Emergency As-
                                              tion, includes—                                         subsection during the period beginning on              sistance Act.
                                                 (i) the incorporation into the eligible pump         the date of enactment of this paragraph and            SEC. 137. CRITERIA FOR FUNDING ENVIRON-
                                              station of—                                             ending on the date on which the Secretary                         MENTAL        INFRASTRUCTURE
                                                 (I) current design standards;                        issues the guidance under subparagraph                            PROJECTS.
                                                 (II) efficiency improvements; and                    (A).’’.                                                  (a) IN GENERAL.—Not later than 180 days
                                                 (III) associated drainage; and                         (b) NON-FEDERAL PROJECT IMPLEMENTATION               after the date of enactment of this Act, the
                                                 (ii) increasing the capacity of the eligible         FOR COMPREHENSIVE EVERGLADES RESTORA-                  Secretary shall develop specific criteria for




SSpencer on DSK126QN23PROD with HOUSE
                                              pump station, subject to the condition that             TION PLAN PROJECTS.—                                   the evaluation and ranking of individual en-
                                              the increase shall—                                       (1) IN GENERAL.—In carrying out the pilot            vironmental assistance projects authorized
                                                 (I) significantly decrease the risk of loss of       program authorized under section 1043(b) of            by Congress (including projects authorized
                                              life and property damage; or                            the Water Resources Reform and Develop-                pursuant to environmental assistance pro-
                                                 (II) decrease total lifecycle rehabilitation         ment Act of 2014 (33 U.S.C. 2201 note), the            grams) for the Secretary to carry out.
                                              costs for the eligible pump station.                    Secretary is authorized to include a project             (b) MINIMUM CRITERIA.—For the purposes of
                                                 (b) AUTHORIZATION.—The Secretary may                 authorized to be implemented by, or in ac-             carrying out this section, the Secretary shall
                                              carry out rehabilitation of an eligible pump            cordance with, section 601 of the Water Re-            evaluate, at a minimum—




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00039   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6946                                             CONGRESSIONAL RECORD — HOUSE                                                        December 8, 2020
                                                (1) the nature and extent of the positive             medial actions in response to an enhanced                ‘‘(ii) for which construction was completed
                                              and negative local economic impacts of the              inspection carried out under this section.             before 1940;
                                              project, including—                                       (d) FUNDING.—The Secretary is authorized               ‘‘(iii) that is classified as ‘high hazard po-
                                                (A) the benefits of the project to the local          to accept funds from an owner or operator of           tential’ by the State dam safety agency of
                                              economy;                                                aging infrastructure, and may use such funds           the State in which the dam is located; and
                                                (B) the extent to which the project will en-          to carry out an enhanced inspection pursu-               ‘‘(iv) that is operated by a non-Federal en-
                                              hance local development;                                ant to a contract entered into with such               tity; or’’.
                                                (C) the number of jobs that will be directly          owner or operator under this section.                  SEC.   142.   LEVEE ACCREDITATION      PROCESS;
                                              created by the project; and                             SEC. 139. UNIFORMITY OF NOTIFICATION SYS-                            LEVEE CERTIFICATIONS.
                                                (D) the ability of the non-Federal interest                      TEMS.
                                              to pay the applicable non-Federal share of                                                                        (a) SENSE OF CONGRESS.—It is the sense of
                                                                                                        (a) INVENTORY.—Not later than 180 days
                                              the cost of the project;                                                                                       Congress that the process developed by the
                                                                                                      after the date of enactment of this Act, the
                                                (2) the demographics of the location in                                                                      Flood Protection Structure Accreditation
                                                                                                      Secretary shall complete an inventory of all
                                              which the project is to be carried out, includ-                                                                Task Force established under section 100226
                                                                                                      systems used by the Corps of Engineers for
                                              ing whether the project serves—                                                                                of the Moving Ahead for Progress in the 21st
                                                                                                      external communication and notification
                                                (A) a rural community; or                                                                                    Century Act (42 U.S.C. 4101 note) should not
                                                                                                      with respect to projects, initiatives, and fa-
                                                (B) an economically disadvantaged com-                                                                       be limited to levee systems in the inspection
                                                                                                      cilities of the Corps of Engineers.
                                              munity, including an economically disadvan-               (b) UNIFORM PLAN.—                                   of completed works program of the Corps of
                                              taged minority community;                                 (1) IN GENERAL.—Not later than 1 year after          Engineers, but should apply equally to feder-
                                                (3) the amount of appropriations a project            the date of enactment of this Act, the Sec-            ally owned levee systems operated by the
                                              has received;                                           retary shall develop a plan for the uni-               Secretary, including federally owned levee
                                                (4) the funding capability of the Corps of            formity of such communication and notifica-            systems operated by the Secretary as part of
                                              Engineers with respect to the project;                  tion systems for projects, initiatives, and fa-        a reservoir project.
                                                (5) whether the project could be carried out          cilities of the Corps of Engineers.                       (b) LEVEE CERTIFICATIONS.—Section 3014 of
                                              under other Federal authorities at an equiv-              (2) INCLUSIONS.—The plan developed under             the Water Resources Reform and Develop-
                                              alent cost to the non-Federal interest; and             paragraph (1) shall—                                   ment Act of 2014 (42 U.S.C. 4131) is amended—
                                                (6) any other criteria that the Secretary               (A) provide access to information in all                (1) in subsection (a)—
                                              considers to be appropriate.                            forms practicable, including through email,               (A) in paragraph (1)—
                                                (c) INCLUSION IN GUIDANCE.—The Secretary              text messages, news programs and websites,                (i) by striking ‘‘under the inspection of
                                              shall include the criteria developed under              radio, and other forms of notification;                completed works program’’ and inserting
                                              subsection (a) in the annual Civil Works Di-              (B) establish a notification system for any          ‘‘for levee systems under the levee safety and
                                              rect Program Development Policy Guidance                projects, initiatives, or facilities of the Corps      dam safety programs’’; and
                                              of the Secretary.                                       of Engineers that do not have a notification              (ii) by striking ‘‘and’’ at the end;
                                                (d) REPORT TO CONGRESS.—For fiscal year               system;                                                   (B) in paragraph (2)—
                                              2022, and biennially thereafter, in conjunc-              (C) streamline existing communication and               (i) by striking ‘‘activities under the inspec-
                                              tion with the President’s annual budget sub-            notification systems to improve the strength           tion of completed works program of the
                                              mission to Congress under section 1105(a) of            and uniformity of those systems; and                   Corps of Engineers’’ and inserting ‘‘the ac-
                                              title 31, United States Code, the Secretary               (D) emphasize the necessity of timeliness            tivities referred to in paragraph (1)’’;
                                              shall submit to the Committee on Environ-               in notification systems and ensure that the               (ii) by striking ‘‘chapter 1’’ and inserting
                                              ment and Public Works and the Committee                 methods of notification can transmit infor-            ‘‘chapter I’’; and
                                              on Appropriations of the Senate and the                 mation in a timely manner.                                (iii) by striking the period at the end and
                                              Committee on Transportation and Infra-                    (3) IMPLEMENTATION.—                                 inserting ‘‘; and’’; and
                                              structure and the Committee on Appropria-                 (A) IN GENERAL.—Except as provided in                   (C) by adding at the end the following:
                                              tions of the House of Representatives a re-             subparagraph (B), not later than 2 years                  ‘‘(3) in the case of a levee system that is
                                              port that identifies the Secretary’s ranking            after the date of enactment of this Act, the           operated and maintained by the Corps of En-
                                              of individual environmental assistance                  Secretary shall complete the implementa-               gineers, to the maximum extent practicable,
                                              projects authorized by Congress for the Sec-            tion of the plan developed under paragraph             cooperate with local governments seeking a
                                              retary to carry out, in accordance with the             (1).                                                   levee accreditation decision for the levee to
                                              criteria developed under this section.                    (B) EMERGENCY MANAGEMENT NOTIFICA-                   provide information necessary to support the
                                              SEC. 138. AGING INFRASTRUCTURE.                         TION.—Not later than 18 months after the               accreditation decision in a timely manner.’’;
                                                (a) DEFINITIONS.—In this section:                     date of enactment of this Act, the Secretary           and
                                                (1) AGING INFRASTRUCTURE.—The           term          shall implement the provisions of the plan                (2) in paragraph (b)(3), by adding at the end
                                              ‘‘aging infrastructure’’ means a water re-              developed under paragraph (1) relating to              the following:
                                                                                                      emergency management notifications.                       ‘‘(C)     CONTRIBUTED        FUNDS.—Notwith-
                                              sources development project of the Corps of
                                              Engineers, or any other water resources,                  (4) SAVINGS PROVISION.—Nothing in this               standing subparagraph (B), a non-Federal in-
                                              water storage, or irrigation project of an-             section authorizes the elimination of any ex-          terest may fund up to 100 percent of the cost
                                              other Federal agency, that is greater than 75           isting communication or notification system            of any activity carried out under this sub-
                                              years old.                                              used by the Corps of Engineers.                        section.’’.
                                                 (2) ENHANCED INSPECTION.—The term ‘‘en-              SEC. 140. COASTAL STORM DAMAGE REDUCTION               SEC. 143. PROJECT PARTNERSHIP AGREEMENT.
                                              hanced inspection’’ means an inspection that                        CONTRACTS.
                                                                                                                                                               Section 103(j)(1) of the Water Resources De-
                                              uses current or innovative technology, in-                For any project for coastal storm damage
                                                                                                                                                             velopment Act of 1986 (33 U.S.C. 2213(j)(1)) is
                                              cluding Light Detection and Ranging (com-               reduction, the Secretary may seek input
                                                                                                                                                             amended—
                                              monly known as ‘‘LiDAR’’), ground pene-                 from a non-Federal interest for a project
                                                                                                                                                               (1) by striking ‘‘Any project’’ and inserting
                                              trating radar, subsurface imaging, or sub-              that may be affected by the timing of the
                                                                                                                                                             the following:
                                              surface geophysical techniques, to detect               coastal storm damage reduction activities
                                                                                                                                                               ‘‘(A) IN GENERAL.—Any project’’; and
                                              whether the features of the aging infrastruc-           under the project, in order to minimize, to
                                                                                                                                                               (2) by adding at the end the following:
                                              ture are structurally sound and can operate             the maximum extent practicable, any nega-
                                                                                                                                                               ‘‘(B) INCLUSION.—An agreement under sub-
                                              as intended, or are at risk of failure.                 tive effects resulting from the timing of
                                                                                                                                                             paragraph (A) shall include a brief descrip-
                                                 (b) CONTRACTS FOR ENHANCED INSPECTION.—              those activities.
                                                                                                                                                             tion and estimation of the anticipated oper-
                                                 (1) IN GENERAL.—The Secretary may carry              SEC. 141. DAM REMEDIATION FOR ECOSYSTEM                ations, maintenance, and replacement and
                                              out enhanced inspections of aging infrastruc-                      RESTORATION.
                                                                                                                                                             rehabilitation costs of the non-Federal inter-
                                              ture, pursuant to a contract with the owner               Section 542(b)(2) of the Water Resources             est for the project.’’.
                                              or operator of the aging infrastructure.                Development Act of 2000 (114 Stat. 2671; 121
                                                 (2) CERTAIN CIRCUMSTANCES.—Subject to                Stat. 1150) is amended—                                SEC. 144. ACCEPTANCE OF FUNDS FOR HARBOR
                                                                                                                                                                         DREDGING.
                                              the availability of appropriations, or funds              (1) in subparagraph (F), by striking ‘‘or’’ at
                                              available pursuant to subsection (d), the Sec-          the end;                                                 The Secretary is authorized, in accordance
                                              retary shall enter into a contract described              (2) by redesignating subparagraph (G) as             with section 5 of Act of June 22, 1936 (33
                                              in paragraph (1), if—                                   subparagraph (H); and                                  U.S.C. 701h), to accept and expend funds con-
                                                 (A) the owner or operator of the aging in-             (3) by inserting after subparagraph (F) the          tributed by a State or other non-Federal in-




SSpencer on DSK126QN23PROD with HOUSE
                                              frastructure requests that the Secretary                following:                                             terest—
                                              carry out the enhanced inspections; and                   ‘‘(G) measures to restore, protect, and pre-           (1) to dredge a non-Federal harbor or chan-
                                                 (B) the inspection is at the full expense of         serve an ecosystem affected by a dam (in-              nel, or a marina or berthing area located ad-
                                              such owner or operator.                                 cluding by the rehabilitation or modification          jacent to, or accessible by, such harbor or
                                                 (c) LIMITATION.—The Secretary shall not              of a dam)—                                             channel; or
                                              require a non-Federal entity associated with              ‘‘(i) that has been constructed, in whole or           (2) to provide technical assistance related
                                              a project under the jurisdiction of another             in part, by the Corps of Engineers for flood           to the planning and design of dredging ac-
                                              Federal agency to carry out corrective or re-           control purposes;                                      tivities described in paragraph (1).




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00040   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6947
                                              SEC. 145. REPLACEMENT CAPACITY.                           ‘‘(ii) provides a written basis for the deter-         ‘‘(B) affects existing authorities of the
                                                 Section 217(a) of the Water Resources De-            mination under clause (i) to the non-Federal           Corps of Engineers, including authorities
                                              velopment Act of 1996 (33 U.S.C. 2326a(a)) is           interest.                                              with respect to navigation, flood damage re-
                                              amended—                                                  ‘‘(4) PUBLIC COMMENT.—The Secretary shall            duction, environmental protection and res-
                                                 (1) in the subsection heading, by inserting          afford the public an opportunity to comment            toration, water supply and conservation, and
                                              ‘‘OR REPLACEMENT CAPACITY’’ after ‘‘ADDI-               on the determinations required under this              other related purposes; or
                                              TIONAL CAPACITY’’;                                      subsection for a use permitted under para-               ‘‘(C) authorizes the Secretary to make any
                                                 (2) by striking paragraph (1) and inserting          graph (1)(A)(ii).’’.                                   operational changes to a Corps of Engineers
                                              the following:                                          SEC. 146. REVIEWING HYDROPOWER AT CORPS                water resources development project.’’.
                                                 ‘‘(1) PROVIDED BY SECRETARY.—                                   OF ENGINEERS FACILITIES.                    SEC. 147. REPAIR AND RESTORATION OF EM-
                                                 ‘‘(A) IN GENERAL.—Subject to subparagraph              Section 1008 of the Water Resources Re-                         BANKMENTS.
                                              (B), at the request of a non-Federal interest           form and Development Act of 2014 (33 U.S.C.              (a) IN GENERAL.—At the request of a non-
                                              with respect to a project, the Secretary                2321b) is amended—                                     Federal interest, the Secretary shall assess
                                              may—                                                      (1) by striking ‘‘civil works’’ each place it        the cause of damage to, or the failure of, an
                                                 ‘‘(i) provide additional capacity at a               appears and inserting ‘‘water resources de-            embankment that is adjacent to the shore-
                                              dredged material disposal facility con-                 velopment’’; and                                       line of a reservoir project owned and oper-
                                              structed by the Secretary beyond the capac-               (2) by adding at the end the following:              ated by the Secretary for which such damage
                                              ity that would be required for project pur-               ‘‘(c) REVIEWING HYDROPOWER AT CORPS OF               or failure to the embankment has adversely
                                              poses; or                                               ENGINEERS FACILITIES.—                                 affected a roadway that the Secretary has
                                                 ‘‘(ii) permit the use of dredged material              ‘‘(1) DEFINITION OF ELIGIBLE NON-FEDERAL             relocated for construction of the reservoir.
                                                                                                                                                               (b) REPAIR AND RESTORATION ACTIVITIES.—
                                              disposal facility capacity required for                 INTEREST.—In this subsection, the term ‘eli-
                                                                                                                                                             If, based on the assessment carried out under
                                              project purposes by the non-Federal interest            gible non-Federal interest’ means a non-Fed-
                                                                                                                                                             subsection (a), the Secretary determines
                                              if the Secretary determines that replace-               eral interest that owns or operates an exist-          that the cause of the damage to, or the fail-
                                              ment capacity can be constructed at the fa-             ing non-Federal hydropower facility at a               ure of, the embankment is the direct result
                                              cility or another facility or site before such          Corps of Engineers water resources develop-            of the design or operation of the reservoir by
                                              capacity is needed for project purposes.                ment project.                                          the Secretary, the Secretary is authorized to
                                                 ‘‘(B) AGREEMENT.—Before the Secretary                  ‘‘(2) EVALUATION.—                                   participate in the repair or restoration of
                                              takes an action under subparagraph (A), the               ‘‘(A) IN GENERAL.—On the written request             such embankment.
                                              non-Federal interest shall agree to pay—                of an eligible non-Federal interest, the Sec-            (c) AUTHORIZATION OF APPROPRIATIONS.—
                                                 ‘‘(i) all costs associated with the construc-        retary shall conduct an evaluation to con-             There is authorized to be appropriated to the
                                              tion of the additional capacity or replace-             sider operational changes at the applicable            Secretary $10,000,000 to carry out this sec-
                                              ment capacity in advance of construction of             project to facilitate production of non-Fed-           tion.
                                              such capacity; and                                      eral hydropower, consistent with authorized            SEC. 148. COASTAL MAPPING.
                                                 ‘‘(ii) in the case of use by a non-Federal in-       project purposes. The Secretary shall solicit            Section 516 of the Water Resources Devel-
                                              terest of dredged material disposal capacity            input from interested stakeholders as part of          opment Act of 1996 (33 U.S.C. 2326b) is amend-
                                              required for project purposes under subpara-            the evaluation.                                        ed—
                                              graph (A)(ii), any increase in the cost of op-            ‘‘(B) DEADLINE.—Not later than 180 days                (1) by redesignating subsection (g) as sub-
                                              eration and maintenance of the project that             after the date on which the Secretary re-              section (h);
                                              the Secretary determines results from the               ceives a written request under subparagraph              (2) by inserting after subsection (f) the fol-
                                              use of the project capacity by the non-Fed-             (A), the Secretary shall provide to the non-           lowing:
                                              eral interest in advance of each cycle of               Federal interest a written response to inform            ‘‘(g) COASTAL MAPPING.—The Secretary
                                              dredging.                                               the non-Federal interest—                              shall develop and carry out a plan for the re-
                                                 ‘‘(C) CREDIT.—In the event the Secretary               ‘‘(i) that the Secretary has approved the            curring mapping of coastlines that are expe-
                                              determines that the cost to operate or main-            request to conduct an evaluation; or                   riencing rapid change, including such coast-
                                              tain the project decreases as a result of use             ‘‘(ii) of any additional information nec-            lines in—
                                              by the non-Federal interest of dredged mate-            essary for the Secretary to approve the re-              ‘‘(1) Alaska;
                                              rial disposal capacity required for project             quest to conduct an evaluation.                          ‘‘(2) Hawaii; and
                                              purposes under subparagraph (A)(ii), the Sec-             ‘‘(3) OPERATIONAL CHANGES.—An oper-                    ‘‘(3) any territory or possession of the
                                              retary, at the request of the non-Federal in-           ational change referred to in paragraph                United States.’’; and
                                              terest, shall credit the amount of the de-              (2)(A) may include—                                      (3) in subsection (h) (as so redesignated),
                                              crease toward any cash contribution of the                ‘‘(A) changes to seasonal pool levels;               by adding at the end the following:
                                              non-Federal interest required thereafter for              ‘‘(B) modifying releases from the project;             ‘‘(3) COASTAL MAPPING.—In addition to
                                              construction, operation, or maintenance of              and                                                    amounts made available under paragraph (1),
                                              the project, or of another navigation                     ‘‘(C) other changes included in the written          there is authorized to be appropriated to
                                              project.’’;                                             request submitted under that paragraph that            carry out subsection (g) with respect to Alas-
                                                 (3) in paragraph (2), in the first sentence,         enhance the usage of the project to facilitate         ka, Hawaii, and the territories and posses-
                                              by inserting ‘‘under paragraph (1)(A)(i)’’              production of non-Federal hydropower, con-             sions of the United States, $10,000,000, to re-
                                              after ‘‘additional capacity’’; and                      sistent with authorized project purposes.              main available until expended.’’.
                                                 (4) by adding at the end the following:                ‘‘(4) COST SHARE.—The eligible non-Federal           SEC. 149. INTERIM RISK REDUCTION MEASURES.
                                                 ‘‘(3) SPECIAL RULE FOR DESIGNATION OF RE-            interest shall pay 100 percent of the costs as-          (a) IN GENERAL.—In the case of any interim
                                              PLACEMENT CAPACITY FACILITY OR SITE.—                   sociated with an evaluation under this sub-            risk reduction measure for dam safety pur-
                                                 ‘‘(A) IN GENERAL.—Subject to such terms              section, including the costs to prepare the            poses that was evaluated in a final environ-
                                              and conditions as the Secretary determines              report under paragraph (6).                            mental assessment completed during the pe-
                                              to be necessary or advisable, an agreement                ‘‘(5) DEADLINE.—The Secretary shall com-             riod beginning on March 18, 2019, and ending
                                              under paragraph (1)(B) for use permitted                plete an evaluation under this subsection by           on the date of enactment of this Act, the
                                              under paragraph (1)(A)(ii) shall reserve to             the date that is not later than 1 year after           Secretary shall carry out a reevaluation of
                                              the non-Federal interest—                               the date on which the Secretary begins the             the measure in a timely manner if the final
                                                 ‘‘(i) the right to submit to the Secretary           evaluation.                                            environmental assessment did not consider
                                              for approval at a later date an alternative to            ‘‘(6) REPORT.—On completion of an evalua-            in detail at least—
                                              the facility or site designated in the agree-           tion under this subsection, the Secretary                (1) 1 operational water control plan change
                                              ment for construction of replacement capac-             shall submit to the Committee on Environ-              alternative;
                                              ity; and                                                ment and Public Works of the Senate and                  (2) 1 action alternative other than an oper-
                                                 ‘‘(ii) the right to construct the replace-           the Committee on Transportation and Infra-             ational water control plan change; and
                                              ment capacity at the alternative facility or            structure of the House of Representatives a              (3) the no action alternative.
                                              site at the expense of the non-Federal inter-           report on the effects of the operational                 (b) COORDINATION.—A reevaluation carried
                                              est.                                                    changes proposed by the non-Federal inter-             out under subsection (a) shall include consid-
                                                 ‘‘(B) REQUIREMENT.—The Secretary shall               est and examined in the evaluation on the              eration of the alternatives described in such
                                              not reject a site for the construction of re-           authorized purposes of the project, including          subsection, which shall be developed in co-
                                              placement        capacity     under    paragraph        a description of any negative impacts of the           ordination with Federal agencies, States, In-




SSpencer on DSK126QN23PROD with HOUSE
                                              (1)(A)(ii) that is submitted by the non-Fed-            proposed operational changes on the author-            dian Tribes, units of local government, and
                                              eral interest for approval by the Secretary             ized purposes of the project, or on any Fed-           other non-Federal interests that have exist-
                                              before the date of execution of the agree-              eral project located in the same basin.                ing water obligations that would be directly
                                              ment under paragraph (1)(B), or thereafter,               ‘‘(7) SAVINGS PROVISION.—Nothing in this             affected by implementation of an interim
                                              unless the Secretary—                                   subsection—                                            risk reduction measure that is the subject of
                                                 ‘‘(i) determines that the site is environ-             ‘‘(A) affects the authorized purposes of a           the reevaluation.
                                              mentally unacceptable, geographically unac-             Corps of Engineers water resources develop-              (c) IMPLEMENTATION PRIOR TO REEVALUA-
                                              ceptable, or technically unsound; and                   ment project;                                          TION.—Nothing in this section prohibits the




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00041   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6948                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                              Secretary from implementing an interim                  that analysis any additional design and con-             (3) the Government of the Russian Federa-
                                              risk reduction measure for which a reevalua-            struction costs resulting from addressing              tion has prioritized the development of Arc-
                                              tion is required under subsection (a) prior to          seismic concerns.                                      tic maritime transportation capabilities and
                                              the completion of the reevaluation under                  (b) SAVINGS PROVISION.—Except with re-               has made significant investments in military
                                              subsection (a).                                         spect to the benefit-cost analysis, the addi-          infrastructure in the Arctic, including the
                                              SEC. 150. MAINTENANCE DREDGING PERMITS.                 tional costs referred to in subsection (a)             construction or refurbishment of 16 deep-
                                                (a) IN GENERAL.—The Secretary shall, to               shall be—                                              water ports in the region;
                                              the maximum extent practicable, prioritize                (1) included in the total project cost; and            (4) is a serious concern that the closest
                                              the reissuance of any regional general per-               (2) subject to cost-share requirements oth-          United States strategic seaports to the Arc-
                                              mit for maintenance dredging that expires               erwise applicable to the project.                      tic are the Port of Anchorage and the Port of
                                                                                                      SEC. 153. LEASE DEVIATIONS.                            Tacoma, located approximately 1,500 nau-
                                              prior to May 1, 2021, and shall use best efforts
                                              to ensure such reissuance prior to expiration             (a) DEFINITION OF COVERED LEASE DEVI-                tical miles and 2,400 nautical miles away
                                                                                                      ATION.—In this section, the term ‘‘covered             from the Arctic, respectively, and approxi-
                                              of such a regional general permit for mainte-
                                              nance dredging.                                         lease deviation’’ means a change in terms              mately 1,900 nautical miles and 2,800 nautical
                                                (b) SAVINGS PROVISION.—Nothing in this                from the existing lease that requires ap-              miles, respectively, from Utiagvik, Alaska;
                                                                                                      proval from the Secretary for a lease—                 and
                                              section affects any obligation to comply
                                                                                                        (1) of Federal land within the State of                (5) it is in the national interest to enhance
                                              with the requirements of any Federal law,
                                                                                                      Oklahoma that is associated with a water re-           existing, and develop, maritime transpor-
                                              including—
                                                                                                      sources development project, under—                    tation infrastructure in the Arctic, including
                                                (1) the National Environmental Policy Act
                                                                                                        (A) section 2667 of title 10, United States          an Arctic deep draft strategic seaport in
                                              of 1969 (42 U.S.C. 4321 et seq.);
                                                                                                      Code; or                                               Alaska, that would allow the Coast Guard
                                                (2) the Federal Water Pollution Control
                                                                                                        (B) section 4 of the Act of December 22,             and the Navy each to perform their respec-
                                              Act (33 U.S.C. 1251 et seq.); and
                                                                                                      1944 (16 U.S.C. 460d); and                             tive statutory duties and functions on a per-
                                                (3) the Endangered Species Act of 1973 (16
                                                                                                        (2) with respect to which the lessee is in           manent basis with minimal mission inter-
                                              U.S.C. 1531 et seq.).
                                                                                                      good standing.                                         ruption.
                                              SEC. 151. HIGH WATER-LOW WATER PREPARED-                  (b) DEADLINE.—In the case of a request for
                                                          NESS.                                                                                              SEC. 155. SMALL WATER STORAGE PROJECTS.
                                                                                                      a covered lease deviation—
                                                (a) DEFINITIONS.—In this section:                                                                              (a) IN GENERAL.—The Secretary shall carry
                                                                                                        (1) the Division Commander of the South-             out a program to study and construct new,
                                                (1) BYPASS.—The term ‘‘bypass’’ means an              western Division shall—
                                              alternate water route adjacent to a lock and                                                                   or enlarge existing, small water storage
                                                                                                        (A) notify the Secretary of the request via          projects, in partnership with a non-Federal
                                              dam on a Federal inland waterway system                 electronic means by not later than 24 hours
                                              that can be used for commercial navigation                                                                     interest.
                                                                                                      after receiving the request; and                         (b) REQUIREMENTS.—To be eligible to par-
                                              during high water conditions.                             (B) by not later than 10 business days after
                                                 (2)   EMERGENCY     CONDITION.—The     term                                                                 ticipate in the program under this section, a
                                                                                                      the date on which the Division Commander               small water storage project shall—
                                              ‘‘emergency condition’’ means—                          notifies the Secretary under subparagraph                (1) in the case of a new small water storage
                                                 (A) unsafe conditions on a Federal inland            (A)—                                                   project, have a water storage capacity of not
                                              waterway system that prevent the operation                (i) make a determination approving, deny-            less than 2,000 acre-feet and not more than
                                              of commercial vessels, resulting from a                 ing, or requesting a modification to the re-           30,000 acre-feet;
                                              major change in water level or flows;                   quest; and                                               (2) in the case of an enlargement of an ex-
                                                 (B) an obstruction in a Federal inland wa-             (ii) provide to the Secretary the deter-             isting small water storage project, be for an
                                              terway system, including silt, sediment,                mination under clause (i); and                         enlargement of not less than 1,000 acre-feet
                                              rock formation, or a shallow channel;                     (2) if the Division Commander does not               and not more than 30,000 acre-feet;
                                                 (C) an impaired or inoperable Federal lock           make a determination under paragraph                     (3) provide—
                                              and dam; or                                             (1)(B), the Secretary shall make a deter-                (A) flood risk management benefits;
                                                 (D) any other condition determined appro-            mination approving, denying, or requesting a             (B) ecological benefits; or
                                              priate by the Secretary.                                modification to the request by not later than
                                                 (b) EMERGENCY DETERMINATION.—The Sec-                                                                         (C) water management, water conserva-
                                                                                                      10 business days after the date on which the           tion, or water supply; and
                                              retary, in consultation with the District               deadline described in paragraph (1)(B) ex-
                                              Commanders responsible for maintaining                                                                           (4) be—
                                                                                                      pires.                                                   (A)     economically    justified,  environ-
                                              any Federal inland waterway system, the                   (c) NOTIFICATION.—If the Secretary does
                                              users of the waterway system, and the Coast                                                                    mentally acceptable, and technically fea-
                                                                                                      not make a determination under subsection              sible; or
                                              Guard, may make a determination that an                 (b)(2) by the deadline described in that sub-
                                              emergency condition exists on the waterway                                                                       (B) in the case of a project providing eco-
                                                                                                      section, the Secretary shall submit a notifi-          logical benefits, cost-effective with respect
                                              system.                                                 cation of the failure to make a determina-
                                                 (c) EMERGENCY MITIGATION PROJECT.—                                                                          to such benefits.
                                                                                                      tion with respect to the covered lease devi-             (c) SCOPE.—In carrying out the program
                                                 (1) IN GENERAL.—Subject to paragraph (2)             ation, including the reason for the failure            under this section, the Secretary shall give
                                              and the availability of appropriations, and in          and a description of any outstanding issues,           preference to a small water storage project
                                              accordance with all applicable Federal re-              to—                                                    located in a State with a population of less
                                              quirements, the Secretary may carry out an                (1) the entity seeking the covered lease de-         than 1,000,000.
                                              emergency mitigation project on a Federal               viation;                                                 (d) EXPEDITED PROJECTS.—For the 10-year
                                              inland waterway system with respect to                    (2) the members of the Oklahoma congres-             period beginning on the date of enactment of
                                              which the Secretary has determined that an              sional delegation;                                     this Act, the Secretary shall expedite small
                                              emergency condition exists under subsection               (3) the Committee on Environment and                 water storage projects under this section for
                                              (b), or on a bypass of such system, to remedy           Public Works of the Senate; and                        which applicable Federal permitting require-
                                              that emergency condition.                                 (4) the Committee on Transportation and              ments have been completed.
                                                 (2) DEADLINE.—An emergency mitigation                Infrastructure of the House of Representa-               (e) USE OF DATA.—In conducting a study
                                              project under paragraph (1) shall—                      tives.                                                 under this section, to the maximum extent
                                                 (A) be initiated by not later than 60 days           SEC. 154. SENSE OF CONGRESS ON ARCTIC DEEP             practicable, the Secretary shall—
                                              after the date on which the Secretary makes                         DRAFT PORT DEVELOPMENT.                      (1) as the Secretary determines appro-
                                              the applicable determination under sub-                   It is the sense of Congress that—                    priate, consider and utilize any applicable
                                              section (b); and                                          (1) the Arctic, as defined in section 112 of         hydrologic, economic, or environmental data
                                                 (B) to the maximum extent practicable, be            the Arctic Research and Policy Act of 1984             that is prepared for a small water storage
                                              completed by not later than 1 year after the            (Public Law 98–373), is a region of strategic          project under State law as the documenta-
                                              date on which the Secretary makes such de-              importance to the national security and                tion, or part of the documentation, required
                                              termination.                                            maritime transportation interests of the               to complete State water plans or other State
                                                 (d) AUTHORIZATION OF APPROPRIATIONS.—                United States;                                         planning documents relating to water re-
                                              There is authorized to be appropriated to the             (2) there is a compelling national, regional,        sources management; and
                                              Secretary to carry out this section $25,000,000         Alaska Native, and private sector need for               (2) consider information developed by the
                                              for each of fiscal years 2022 through 2024, to          permanent maritime transportation infra-               non-Federal interest in relation to another
                                              remain available until expended.                        structure development and for a presence in            study, to the extent the Secretary deter-




SSpencer on DSK126QN23PROD with HOUSE
                                              SEC. 152. TREATMENT OF CERTAIN BENEFITS                 the Arctic by the United States to assert na-          mines such information is applicable, appro-
                                                         AND COSTS.                                   tional security interests and to support and           priate, or otherwise authorized by law.
                                                (a) IN GENERAL.—In the case of a flood risk           facilitate search and rescue, shipping safety,           (f) COST SHARE.—
                                              management project that incidentally gen-               economic development, oil spill prevention               (1) STUDY.—The Federal share of the cost
                                              erates seismic safety benefits in regions of            and response, subsistence and commercial               of a study conducted under this section shall
                                              moderate or high seismic hazard, for the pur-           fishing, the establishment of ports of refuge,         be—
                                              pose of a benefit-cost analysis for the                 Arctic research, and maritime law enforce-               (A) 100 percent for costs not to exceed
                                              project, the Secretary shall not include in             ment;                                                  $100,000; and




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00042   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6949
                                                (B) 50 percent for any costs above $100,000.          tional Academy of Sciences to conduct a                an authorized project), modernization activi-
                                                (2) CONSTRUCTION.—A small water storage               study on the ability of Federal agencies to            ties for such project; or
                                              project carried out under this section shall            coordinate with other Federal agencies,                  (B) coordinate with the non-Federal inter-
                                              be subject to the cost-sharing requirements             State and local agencies, Indian Tribes, com-          est in order to allow the non-Federal interest
                                              applicable to projects under section 103 of             munities, universities, consortiums, coun-             to carry out, for an authorized project (or a
                                              the Water Resources Development Act of                  cils, and other relevant entities with exper-          separable element of an authorized project),
                                              1986 (33 U.S.C. 2213), including—                       tise in water resources to facilitate and co-          such modernization activities.
                                                (A) municipal and industrial water supply:            ordinate the sharing among such entities of              (2) NUMBER.—The Secretary shall select
                                              100 percent non-Federal;                                water allocation, supply, and demand data,             not more than 2 authorized projects to par-
                                                (B) agricultural water supply: 35 percent             including—                                             ticipate in the pilot program under para-
                                              non-Federal; and                                          (A) any catalogs of such data;                       graph (1).
                                                (C) recreation, including recreational navi-            (B) definitions of any commonly used                   (3) CONDITIONS.—Before carrying out mod-
                                              gation: 50 percent of separable costs and, in           terms relating to water allocation, supply,            ernization activities pursuant to paragraph
                                              the case of any harbor or inland harbor or              and demand; and                                        (1)(B), a non-Federal interest shall—
                                              channel project, 50 percent of joint and sepa-            (C) a description of any common standards              (A) obtain any permit or approval required
                                              rable costs allocated to recreational naviga-           used by those entities.                                in connection with such activities under
                                              tion.                                                     (2) REPORT.—If the National Academy of               Federal or State law that would be required
                                                (g) OMRRR RESPONSIBILITY.—The costs of                Sciences enters into an agreement under                if the Secretary were to carry out such ac-
                                              operation, maintenance, repair, and replace-            paragraph (1), to the maximum extent prac-             tivities; and
                                              ment and rehabilitation for a small water               ticable, not later than 1 year after the date            (B) ensure that a final environmental im-
                                              storage project constructed under this sec-             of enactment of this Act, the National Acad-           pact statement or environmental assess-
                                              tion shall be the responsibility of the non-            emy of Sciences shall submit to Congress a             ment, as appropriate, for such activities has
                                              Federal interest.                                       report that includes—                                  been filed pursuant to the National Environ-
                                                (h) INDIVIDUAL PROJECT LIMIT.—Not more                  (A) the results of the study under para-             mental Policy Act of 1969.
                                              than $65,000,000 in Federal funds may be                graph (1);                                               (4) MONITORING.—For any modernization
                                              made available to a small water storage                   (B) recommendations for ways to stream-              activities carried out by the non-Federal in-
                                              project under this section.                             line and make cost-effective methods for               terest pursuant to this section, the Sec-
                                                (i) AUTHORIZATION OF APPROPRIATIONS.—                 Federal agencies to coordinate interstate              retary shall regularly monitor and audit
                                              There is authorized to be appropriated to               sharing of data, including recommendations             such activities to ensure that—
                                              carry out this section $130,000,000 annually            for the development of a publicly accessible,            (A) the modernization activities are car-
                                              through fiscal year 2030.                               internet-based platform that can allow enti-           ried out in accordance with this section; and
                                              SEC. 156. PLANNING ASSISTANCE TO STATES.
                                                                                                      ties described in paragraph (1) to commu-                (B) the cost of the modernization activities
                                                In carrying out section 22 of the Water Re-           nicate and coordinate ongoing data collec-             is reasonable.
                                              sources Development Act of 1974 (42 U.S.C.              tion efforts relating to water allocation, sup-          (5) REQUIREMENTS.—The requirements of
                                              1962d–16), the Secretary shall provide equal            ply, and demand, and share best practices re-          section 3142 of title 40, United States Code
                                              priority for all mission areas of the Corps of          lating to those efforts; and                           shall apply to any modernization activities
                                              Engineers, including water supply and water                                                                    undertaken under or pursuant to this sec-
                                                                                                        (C) a recommendation as to an appropriate
                                              conservation.
                                                                                                      Federal entity that should—                            tion, either by the Secretary or the non-Fed-
                                              SEC. 157. FORECAST-INFORMED RESERVOIR OP-
                                                                                                        (i) serve as the lead coordinator for the            eral interest.
                                                          ERATIONS.
                                                                                                      sharing of data relating to water allocation,            (d) AGREEMENTS.—
                                                Section 1222 of the Water Resources Devel-
                                                                                                      supply, and demand; and                                  (1) ACTIVITIES CARRIED OUT BY NON-FEDERAL
                                              opment Act of 2018 (128 Stat. 3811) is amend-
                                                                                                        (ii) host and manage the internet-based              INTEREST.—
                                              ed by adding at the end the following:
                                                ‘‘(c) ADDITIONAL UTILIZATION OF FORECAST-             platform described in subparagraph (B).                  (A) IN GENERAL.—
                                              INFORMED RESERVOIR OPERATIONS.—                           (b) DATA TRANSPARENCY.—The Secretary                   (i) WRITTEN AGREEMENT.—Before a non-
                                                ‘‘(1) IN GENERAL.—Not later than 1 year               shall prioritize making publicly available             Federal interest initiates modernization ac-
                                              after the date of enactment of this sub-                water resources data in the custody of the             tivities for an authorized project pursuant to
                                              section, the Secretary shall submit to the              Corps of Engineers, as authorized by section           this subsection (c)(1)(B), the non-Federal in-
                                              Committee on Transportation and Infra-                  2017 of the Water Resources Development                terest shall enter into a written agreement
                                              structure of the House of Representatives               Act of 2007 (33 U.S.C. 2342).                          with the Secretary, under section 221 of the
                                              and the Committee on Environment and                      (c) FUNDING.—From amounts otherwise ap-              Flood Control Act of 1970 (42 U.S.C. 1962d–5b),
                                              Public Works of the Senate a report on any              propriated or made available to the Sec-               that requires the modernization activities to
                                              additional opportunities identified for uti-            retary, the Secretary may make available to            be carried out in accordance with—
                                              lizing forecast-informed reservoir operations           the National Academy of Sciences not more                (I) a plan approved by the Secretary; and
                                              across the United States, including an as-              than $3,900,000, to be used for the review of            (II) any other terms and conditions speci-
                                              sessment of the viability of forecast-in-               information provided by the Corps of Engi-             fied by the Secretary in the agreement.
                                              formed reservoir operations in the Upper                neers for purposes of a study under sub-                 (ii) REQUIREMENTS.—A written agreement
                                              Missouri River Basin and the North Platte               section (a). The Secretary may accept funds            under clause (i) shall provide that the non-
                                              River Basin.                                            from another Federal agency and make such              Federal interest shall comply with the same
                                                ‘‘(2) FORECAST-INFORMED RESERVOIR OPER-               funds available to the National Academy of             legal and technical requirements that would
                                              ATIONS.—                                                Sciences, to be used for the review of infor-          apply if the modernization activities were
                                                ‘‘(A) AUTHORIZATION.—If the Secretary de-             mation provided by such agency for purposes            carried out by the Secretary, including all
                                              termines, and includes in the report sub-               of a study under subsection (a).                       mitigation required to offset environmental
                                              mitted under paragraph (1), that forecast-in-           SEC. 159. INLAND WATERWAYS PILOT PROGRAM.              impacts of the activities, as determined by
                                              formed reservoir operations are viable at a               (a) DEFINITIONS.—In this section:                    the Secretary.
                                              reservoir in the Upper Missouri River Basin               (1) AUTHORIZED PROJECT.—The term ‘‘au-                 (B) ALIGNMENT WITH ONGOING ACTIVITIES.—
                                              or the North Platte River Basin, including a            thorized project’’ means a federally author-           A written agreement under subparagraph (A)
                                              reservoir for which the Secretary has flood             ized water resources development project for           shall include provisions that, to the max-
                                              control responsibilities under section 7 of the         navigation on the inland waterways.                    imum extent practicable, align moderniza-
                                              Act of December 22, 1944 (33 U.S.C. 709), the              (2) MODERNIZATION ACTIVITIES.—The term              tion activities under this section with ongo-
                                              Secretary is authorized to carry out fore-              ‘‘modernization activities’’ means construc-           ing operations and maintenance activities
                                              cast-informed reservoir operations at such              tion or major rehabilitation activities for            for the applicable authorized project.
                                              reservoir.                                              any authorized project.                                  (C) INDEMNIFICATION.—As part of a written
                                                ‘‘(B) REQUIREMENT.—Subject to the avail-                 (3) NON-FEDERAL INTEREST.—The term                  agreement under subparagraph (A), the non-
                                              ability of appropriations, if the Secretary de-         ‘‘non-Federal interest’’ means any public              Federal interest shall agree to hold and save
                                              termines, and includes in the report sub-               body described in section 221(b) of the Flood          the United States free from liability for any
                                              mitted under paragraph (1), that forecast-in-           Control Act of 1970 (42 U.S.C. 1962d–5b(b)).           and all damage that arises from the mod-
                                              formed reservoir operations are viable in the              (b) AUTHORIZATION OF PILOT PROGRAM.—                ernization activities carried out by the non-
                                              Upper Missouri River Basin or the North                 The Secretary is authorized to carry out a             Federal interest pursuant to this section.
                                              Platte River Basin, the Secretary shall carry           pilot program for modernization activities               (2) ACTIVITIES CARRIED OUT BY SEC-




SSpencer on DSK126QN23PROD with HOUSE
                                              out forecast-informed reservoir operations at           on the inland waterways system.                        RETARY.—For modernization activities to be
                                              not fewer than one reservoir in such basin.’’.             (c) IMPLEMENTATION.—                                carried out by the Secretary pursuant to
                                              SEC. 158. DATA FOR WATER ALLOCATION, SUP-                  (1) IN GENERAL.—In carrying out the pilot           subsection (c)(1)(A), the non-Federal interest
                                                          PLY, AND DEMAND.                            program under this section, the Secretary              shall enter into a written agreement with
                                                (a) STUDY ON DATA FOR WATER ALLOCATION,               may—                                                   the Secretary, containing such terms and
                                              SUPPLY, AND DEMAND.—                                       (A) accept and expend funds provided by a           conditions as the Secretary determines ap-
                                                (1) IN GENERAL.—The Secretary shall offer             non-Federal interest to carry out, for an au-          propriate.
                                              to enter into an agreement with the Na-                 thorized project (or a separable element of              (e) REIMBURSEMENT.—




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00043   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6950                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                                (1) AUTHORIZATION.—Subject to the avail-                (c) PUBLIC COMMENT.—In developing the                the required analyses, reviews, and compli-
                                              ability of appropriations, the Secretary may            guidance under subsection (a), the Secretary           ance processes.
                                              reimburse a non-Federal interest for the                shall provide notice and an opportunity for               ‘‘(5) STATUS UPDATES.—Not later than 30
                                              costs of modernization activities carried out           public comment.                                        days after receiving a request under para-
                                              by the non-Federal interest pursuant to an              SEC. 161. STUDIES OF WATER RESOURCES DE-               graph (3), and every 30 days thereafter until
                                              agreement entered into under subsection (d),                        VELOPMENT PROJECTS BY NON-                 the Secretary submits an assessment under
                                              or for funds provided to the Secretary under                        FEDERAL INTERESTS.                         subsection (c) for the applicable feasibility
                                              subsection (c)(1)(A), if—                                 (a) IN GENERAL.—Section 203 of the Water             study, the Secretary shall notify the Com-
                                                (A) the non-Federal interest complies with            Resources Development Act of 1986 (33 U.S.C.           mittee on Transportation and Infrastructure
                                              the agreement entered into under subsection             2231) is amended—                                      of the House of Representatives, the Com-
                                              (d); and                                                  (1) in subsection (a)—                               mittee on Environment and Public Works of
                                                (B) with respect to modernization activi-               (A) in paragraph (1), by inserting ‘‘, or,           the Senate, and the non-Federal interest of
                                              ties carried out by the non-Federal interest            upon the written approval of the Secretary             the status of the Secretary’s required anal-
                                              pursuant to the agreement, the Secretary de-            that the modifications are consistent with             yses, reviews, and compliance processes.’’;
                                              termines that the non-Federal interest com-             the authorized purposes of the project, un-            and
                                              plied with all applicable Federal require-              dertake a feasibility study on modifications              (3) in subsection (c)(1), in the matter pre-
                                                                                                      to a water resources development project
                                              ments in carrying out the modernization ac-                                                                    ceding subparagraph (A)—
                                                                                                      constructed by the Corps of Engineers,’’
                                              tivities.                                                                                                         (A) by striking ‘‘after the date of receipt of
                                                                                                      after ‘‘water resources development project’’;
                                                (2) LIMITATION.—The Secretary may only                                                                       a feasibility study of a project under sub-
                                                                                                      and
                                              reimburse a non-Federal interest under para-                                                                   section (a)(1)’’ and insert ‘‘after the comple-
                                                                                                        (B) in paragraph (2), by striking ‘‘for feasi-
                                              graph (1) for costs of construction that would                                                                 tion of review of a feasibility study under
                                                                                                      bility studies’’ and all that follows through
                                              otherwise be paid from amounts appro-                                                                          subsection (b)’’; and
                                                                                                      the period at the end and inserting ‘‘for the
                                              priated from the general fund of the Treas-                                                                       (B) by striking ‘‘a report’’ and inserting
                                                                                                      formulation of feasibility studies of water
                                              ury pursuant to section 102 of the Water Re-                                                                   ‘‘an assessment’’.
                                                                                                      resources development projects undertaken
                                              sources Development Act of 1986 (33 U.S.C.                                                                        (b) DEADLINE.—Not later than 90 days after
                                                                                                      by non-Federal interests to—
                                              2212).                                                                                                         the date of enactment of this Act, the Sec-
                                                                                                        ‘‘(A) ensure that any feasibility study with
                                                (f) RULE OF CONSTRUCTION.—Nothing in this                                                                    retary shall issue revised guidelines under
                                                                                                      respect to which the Secretary submits an
                                              section—                                                                                                       section 203 of the Water Resources Develop-
                                                                                                      assessment to Congress under subsection (c)
                                                (1) affects the responsibility of the Sec-                                                                   ment Act of 1986 (33 U.S.C. 2231) to imple-
                                                                                                      complies with all of the requirements that
                                              retary for the operations and maintenance of                                                                   ment the amendments made by this section.
                                                                                                      would apply to a feasibility study under-
                                              the inland waterway system, as of the day                                                                         (c) HOLD HARMLESS.—
                                                                                                      taken by the Secretary; and
                                              before the date of enactment of this Act, in-                                                                     (1) ONE-YEAR WINDOW.—The amendments
                                                                                                        ‘‘(B) provide sufficient information for the
                                              cluding the responsibility of the Secretary                                                                    made by this section shall not apply to any
                                                                                                      formulation of the studies, including proc-
                                              for the operations and maintenance costs for                                                                   feasibility study submitted to the Secretary
                                                                                                      esses and procedures related to reviews and
                                              any covered project after the modernization                                                                    under section 203 of the Water Resources De-
                                                                                                      assistance under subsection (e).’’;
                                              activities are completed pursuant to this                 (2) in subsection (b)—                               velopment Act of 1986 (33 U.S.C. 2231) during
                                              section;                                                  (A) by striking ‘‘The Secretary’’ and in-            the one-year period prior to the date of en-
                                                (2) prohibits or prevents the use of Federal          serting the following:                                 actment of this section.
                                              funds for operations and maintenance of the               ‘‘(1) IN GENERAL.—The Secretary’’; and                  (2) 2020 PROJECTS.—The amendments made
                                              inland waterway system or any authorized                  (B) by adding at the end the following:              by this section shall not apply to any project
                                              project within the inland waterway system;                ‘‘(2) TIMING.—The Secretary may not sub-             authorized by section 403 of this Act.
                                              or                                                      mit to Congress an assessment of a feasi-              SEC. 162. LEVERAGING FEDERAL INFRASTRUC-
                                                (3) prohibits or prevents the use of Federal          bility study under this section until such                        TURE FOR INCREASED WATER SUP-
                                              funds for construction or major rehabilita-             time as the Secretary—                                            PLY.
                                              tion activities within the inland waterway                ‘‘(A) determines that the feasibility study            Section 1118(i) of the Water Resources De-
                                              system or for any authorized project within             complies with all of the requirements that             velopment Act of 2016 (43 U.S.C. 390b-2(i)) is
                                              the inland waterway system.                             would apply to a feasibility study under-              amended—
                                                (g) NOTIFICATION.—If a non-Federal inter-                                                                      (1) by striking ‘‘The Secretary may’’ and
                                                                                                      taken by the Secretary; and
                                              est notifies the Secretary that the non-Fed-                                                                   inserting the following:
                                                                                                        ‘‘(B) completes all of the Federal analyses,
                                              eral interest intends to carry out moderniza-                                                                    ‘‘(1) CONTRIBUTED FUNDS FOR CORPS
                                                                                                      reviews, and compliance processes under the
                                              tion activities for an authorized project, or                                                                  PROJECTS.—The Secretary may’’; and
                                                                                                      National Environmental Policy Act of 1969
                                              separable element thereof, pursuant to this                                                                      (2) by adding at the end the following:
                                                                                                      (42 U.S.C. 4321 et seq.), that would be re-
                                              section, the Secretary shall provide written                                                                     ‘‘(2) CONTRIBUTED FUNDS FOR OTHER FED-
                                                                                                      quired with respect to the proposed project if
                                              notice to the Committee on Environment                                                                         ERAL RESERVOIR PROJECTS.—The Secretary is
                                                                                                      the Secretary had undertaken the feasibility
                                              and Public Works of the Senate and the                                                                         authorized to receive and expend funds from
                                              Committee on Transportation and Infra-                  study.
                                                                                                        ‘‘(3) INITIATION OF REVIEW.—                         a non-Federal interest to formulate, review,
                                              structure of the House of Representatives                                                                      or revise operational documents, pursuant to
                                              concerning the intent of the non-Federal in-              ‘‘(A) REQUEST.—
                                                                                                        ‘‘(i) SUBMISSION.—The non-Federal interest           a proposal submitted in accordance sub-
                                              terest.                                                                                                        section (a), for any reservoir for which the
                                                (h) SUNSET.—                                          may submit to the Secretary a request that
                                                                                                      the Secretary initiate the analyses, reviews,          Secretary is authorized to prescribe regula-
                                                (1) IN GENERAL.—The authority of the Sec-
                                                                                                      and compliance processes described in para-            tions for the use of storage allocated for
                                              retary to enter into an agreement under this
                                                                                                      graph (2)(B) with respect to the proposed              flood control or navigation pursuant to sec-
                                              section shall terminate on the date that is 5
                                                                                                      project prior to the non-Federal interest’s            tion 7 of the Act of December 22, 1944 (33
                                              years after the date of enactment of this
                                                                                                      submission of a feasibility study under sub-           U.S.C. 709).’’.
                                              Act.
                                                (2) REIMBURSEMENT ELIGIBILITY.—The ter-               section (a)(1).                                        SEC. 163. SENSE OF CONGRESS ON REMOVAL OF
                                                                                                        ‘‘(ii) EFFECT.—Receipt by the Secretary of                       UNAUTHORIZED, MANMADE, FLAM-
                                              mination of authority under paragraph (1)                                                                                  MABLE MATERIALS ON CORPS PROP-
                                              shall not extinguish the eligibility of a non-          a request submitted under clause (i) shall be
                                                                                                                                                                         ERTY.
                                              Federal interest to seek reimbursement                  considered the receipt of a proposal or appli-
                                                                                                      cation that will lead to a major Federal ac-             It is the sense of Congress that the Sec-
                                              under subsection (e).                                                                                          retary should, using existing authorities,
                                              SEC. 160. DEFINITION OF ECONOMICALLY DIS-               tion that is subject to the requirements of
                                                                                                      section 102(2)(C) of the National Environ-             prioritize the removal, from facilities and
                                                         ADVANTAGED COMMUNITY.
                                                                                                      mental Policy Act of 1969 (42 U.S.C.                   lands of the Corps of Engineers in regions
                                                (a) IN GENERAL.—Not later than 180 days
                                                                                                      4332(2)(C)) that would be required if the Sec-         that are urban and arid, of materials that
                                              after the date of enactment of this Act, the
                                                                                                      retary were to undertake the feasibility               are manmade, flammable, unauthorized to be
                                              Secretary shall issue guidance defining the
                                                                                                      study.                                                 present, and determined by the Secretary to
                                              term ‘‘economically disadvantaged commu-
                                                                                                        ‘‘(B) DEADLINE.—Not later than 10 days               pose a fire risk that is a threat to public
                                              nity’’ for the purposes of this Act and the
                                              amendments made by this Act.                            after the Secretary receives a request under           safety.
                                                 (b) CONSIDERATIONS.—In defining the term             this paragraph, the Secretary shall begin the          SEC. 164. ENHANCED DEVELOPMENT PROGRAM.
                                              ‘‘economically disadvantaged community’’                required analyses, reviews, and compliance               (a) IN GENERAL.—The Secretary shall re-




SSpencer on DSK126QN23PROD with HOUSE
                                              under subsection (a), the Secretary shall, to           processes.                                             view the master plan and shoreline manage-
                                              the maximum extent practicable, utilize the               ‘‘(4) NOTIFICATION.—Upon receipt of a re-            ment plan for any lake described in section
                                              criteria under paragraph (1) or (2) of section          quest under paragraph (3), the Secretary               3134 of the Water Resources Development
                                              301(a) of the Public Works and Economic De-             shall notify the Committee on Transpor-                Act of 2007 (121 Stat. 1142; 130 Stat. 1671) for
                                              velopment Act of 1965 (42 U.S.C. 3161), to the          tation and Infrastructure of the House of              the purpose of identifying structures or
                                              extent that such criteria are applicable in re-         Representatives and the Committee on Envi-             other improvements that are owned by the
                                              lation to the development of water resources            ronment and Public Works of the Senate of              Secretary and are suitable for enhanced de-
                                              development projects.                                   the request and a timeline for completion of           velopment, if—




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00044   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                    H6951
                                                (1) the master plan and shoreline manage-             standing section 3(c) of the Act of August 13,           (10) TANGIPAHOA PARISH, LOUISIANA.—
                                              ment plan of the lake have been updated                 1946 (33 U.S.C. 426g(c)), there is authorized to       Project     for   flood   risk    management,
                                              since January 1, 2013; and                              be appropriated to carry out such section              Tangipahoa Parish, Louisiana.
                                                (2) the applicable district office of the             $38,000,000 for each of fiscal years 2021                (11) NEWBURY AND NEWBURYPORT, MASSA-
                                              Corps of Engineers has received a written re-           through 2024.                                          CHUSETTS.—Project for coastal storm risk
                                              quest for such a review from any entity.                  (3) SMALL RIVER AND HARBOR IMPROVEMENT               management, Newbury and Newburyport,
                                                (b) DEFINITION OF ENHANCED DEVELOP-                   PROJECTS.—Notwithstanding section 107(a) of            Massachusetts.
                                              MENT.—In this section, the term ‘‘enhanced              the River and Harbor Act of 1960 (33 U.S.C.              (12) ESCATAWPA RIVER BASIN, MISSISSIPPI.—
                                              development’’ means the use, for non-water-             577(a)), there is authorized to be appropriated        Project for flood risk management and eco-
                                              dependent commercial or hospitality indus-              to carry out such section $63,000,000 for each         system restoration, Escatawpa River, Jack-
                                              try purposes or for residential or rec-                 of fiscal years 2021 through 2024.                     son County, Mississippi.
                                              reational purposes, of an existing structure              (4) REGIONAL SEDIMENT MANAGEMENT.—Not-                 (13) LONG BEACH, BAY ST. LOUIS AND MIS-
                                              or other improvement.                                   withstanding section 204(g) of the Water Re-           SISSIPPI SOUND, MISSISSIPPI.—Project for hur-
                                                (c) DIVESTMENT AUTHORITY.—Not later                   sources Development Act of 1992 (33 U.S.C.             ricane and storm damage risk reduction and
                                              than 1 year after the date of enactment of              2326(g)), there is authorized to be appro-             flood risk management, Long Beach, Bay St.
                                              this Act, the Secretary shall—                          priated to carry out such section $63,000,000          Louis and Mississippi Sound, Mississippi.
                                                (1) submit to the Committee on Environ-               for each of fiscal years 2021 through 2024.              (14) TALLAHOMA AND TALLAHALA CREEKS,
                                              ment and Public Works of the Senate and                   (5) SMALL FLOOD CONTROL PROJECTS.—Not-               MISSISSIPPI.—Project for flood risk manage-
                                              the Committee on Transportation and Infra-              withstanding section 205 of the Flood Con-             ment, Leaf River, Jones County, Mississippi.
                                              structure of the House of Representatives a             trol Act of 1948 (33 U.S.C. 701s), there is au-          (15) LOWER MISSOURI RIVER, MISSOURI.—
                                              report that identifies—                                 thorized to be appropriated to carry out such          Project for navigation, Lower Missouri
                                                (A) any structure or other improvement                section $69,250,000 for each of fiscal years 2021      River, Missouri.
                                              owned by the Secretary that—                            through 2024.                                            (16) LOWER OSAGE RIVER BASIN, MISSOURI.—
                                                (i) has been identified as suitable for en-             (6) AQUATIC ECOSYSTEM RESTORATION.—Not-              Project for ecosystem restoration, Lower
                                              hanced development pursuant to subsection               withstanding section 206(f) of the Water Re-           Osage River Basin, Missouri.
                                              (a);                                                    sources Development Act of 1996 (33 U.S.C.               (17) WYATT, MISSOURI.—Project for flood
                                                (ii) the Secretary determines the divest-             2330(f)), there is authorized to be appro-             risk management, P. Fields Pump Station,
                                              ment of which would not adversely affect the            priated to carry out such section $63,000,000          Wyatt, Missouri.
                                              Corps of Engineers operation of the lake at             for each of fiscal years 2021 through 2024.              (18) UPPER BASIN AND STONY BROOK (GREEN
                                              which the structure or other improvement is               (7) REMOVAL OF OBSTRUCTIONS; CLEARING                BROOK SUB-BASIN), RARITAN RIVER BASIN, NEW
                                              located; and                                            CHANNELS.—Notwithstanding section 2 of the             JERSEY.—Reevaluation of the Upper Basin
                                                (iii) a non-Federal interest has offered to           Act of August 28, 1937 (33 U.S.C. 701g), there         and Stony Brook portions of the project for
                                              purchase from the Secretary; and                        is authorized to be appropriated to carry out          flood control, Green Brook Sub-basin, Rari-
                                                (B) the fair market value of any structure            such section $8,000,000 for each of fiscal years       tan River Basin, New Jersey, authorized by
                                              or other improvement identified under sub-              2021 through 2024.                                     section 401 of the Water Resources Develop-
                                              paragraph (A); and                                        (8) PROJECT MODIFICATIONS FOR IMPROVE-               ment Act of 1986 (100 Stat. 4119), including
                                                (2) develop a plan to divest any structure            MENT     OF   ENVIRONMENT.—Notwithstanding             the evaluation of nonstructural measures to
                                              or other improvement identified under para-             section 1135(h) of the Water Resources Devel-          achieve the project purpose.
                                              graph (1)(A), at fair market value, to the ap-          opment Act of 1986 (33 U.S.C. 2309a(h)), there           (19) WADING RIVER CREEK, NEW YORK.—
                                              plicable non-Federal interest.                          is authorized to be appropriated to carry out          Project for hurricane and storm damage risk
                                              SEC. 165. CONTINUING AUTHORITY PROGRAMS.                such section $50,500,000 for each of fiscal            reduction, flood risk management, naviga-
                                                (a) PILOT PROGRAM FOR CONTINUING AU-                  years 2021 through 2024.                               tion, and ecosystem restoration, Wading
                                              THORITY PROJECTS IN SMALL OR DISADVAN-                        TITLE II—STUDIES AND REPORTS                     River Creek, New York.
                                              TAGED COMMUNITIES.—                                                                                              (20) LOWER COLUMBIA RIVER BASIN (TURNING
                                                                                                      SEC. 201. AUTHORIZATION OF PROPOSED FEASI-
                                                (1) IN GENERAL.—Not later than 180 days                           BILITY STUDIES.                            BASIN), OREGON AND WASHINGTON.—Project to
                                              after the date of enactment of this Act, the              (a) IN GENERAL.—The Secretary is author-             improve and add turning basins for the
                                              Secretary shall implement a pilot program,              ized to conduct a feasibility study for the            project for navigation, Columbia River Chan-
                                              in accordance with this subsection, for car-            following projects for water resources devel-          nel, Oregon and Washington, authorized by
                                              rying out a project under a continuing au-              opment and conservation and other purposes,            section 101(b)(13) of the Water Resources De-
                                              thority program for an economically dis-                as identified in the reports titled ‘‘Report to        velopment Act of 1999 (113 Stat. 280).
                                              advantaged community.                                   Congress on Future Water Resources Devel-                (21)    WILLIAMSPORT,        PENNSYLVANIA.—
                                                (2) PARTICIPATION IN PILOT PROGRAM.—In                opment’’ submitted to Congress pursuant to             Project for flood risk management and levee
                                              carrying out paragraph (1), the Secretary               section 7001 of the Water Resources Reform             rehabilitation, greater Williamsport, Penn-
                                              shall—                                                  and Development Act of 2014 (33 U.S.C. 2282d)          sylvania.
                                                (A) publish a notice in the Federal Register          or otherwise reviewed by Congress:                       (22) CITY OF CHARLESTON, SOUTH CARO-
                                              that requests non-Federal interest proposals              (1) SULPHUR RIVER, ARKANSAS AND TEXAS.—              LINA.—Project for tidal- and inland-related
                                              for a project under a continuing authority              Project for ecosystem restoration, Sulphur             flood risk management, Charleston, South
                                              program for an economically disadvantaged               River, Arkansas and Texas.                             Carolina.
                                              community; and                                            (2) CABLE CREEK, CALIFORNIA.—Project for               (23) CHOCOLATE BAYOU, TEXAS.—Project for
                                                (B) review such proposals and select a total          flood risk management, water supply, and               flood risk management, Chocolate Bayou,
                                              of 10 projects, taking into consideration geo-          related benefits, Cable Creek, California.             Texas.
                                              graphic diversity among the selected                      (3) OROVILLE DAM, CALIFORNIA.—Project for              (24) HOUSTON-GALVESTON, TEXAS.—Project
                                              projects.                                               dam safety improvements, Oroville Dam,                 for navigation, Houston-Galveston, Texas.
                                                (3) COST SHARE.—Notwithstanding the cost              California.                                              (25) PORT ARTHUR AND ORANGE COUNTY,
                                              share authorized for the applicable con-                  (4) RIO HONDO CHANNEL, CALIFORNIA.—                  TEXAS.—Project for flood risk management,
                                              tinuing authority program, the Federal                  Project for ecosystem restoration, Rio                 Port Arthur and Orange County, Texas, in-
                                              share of the cost of a project selected under           Hondo Channel, San Gabriel River, Cali-                cluding construction of improvements to in-
                                              paragraph (2) shall be 100 percent.                     fornia.                                                terior drainage.
                                                (4) SUNSET.—The authority to commence                   (5) SHINGLE CREEK AND KISSIMMEE RIVER,                 (26) PORT OF VICTORIA, TEXAS.—Project for
                                              pursuant to this subsection a project se-               FLORIDA.—Project for ecosystem restoration
                                                                                                                                                             flood risk management, Port of Victoria,
                                              lected under paragraph (2) shall terminate on           and water storage, Shingle Creek and Kis-              Texas.
                                              the date that is 10 years after the date of en-         simmee River, Osceola County, Florida.                   (27) VIRGINIA BEACH AND VICINITY, VIRGINIA
                                              actment of this Act.                                      (6) ST. JOHN’S RIVER AND LAKE JESUP, FLOR-           AND NORTH CAROLINA.—Project for coastal
                                                (5) CONTINUING AUTHORITY PROGRAM DE-                  IDA.—Project for ecosystem restoration, St.
                                                                                                                                                             storm risk management, Virginia Beach and
                                              FINED.—In this subsection, the term ‘‘con-              John’s River and Lake Jesup, Florida.                  vicinity, Virginia and North Carolina.
                                              tinuing authority program’’ has the meaning               (7) CHICAGO AREA WATERWAYS SYSTEM, ILLI-               (b) SPECIAL RULE.—The Secretary shall
                                              given that term in section 7001(c)(1)(D) of             NOIS.—Project for ecosystem restoration,               consider any study carried out by the Sec-
                                              Water Resources Reform and Development                  recreation, and other purposes, Illinois               retary to formulate the project for flood risk
                                              Act of 2014 (33 U.S.C. 2282d).                          River, Chicago River, Calumet River, Grand             management, Port Arthur and Orange Coun-
                                                (b) AUTHORIZATIONS OF APPROPRIATIONS.—                Calumet River, Little Calumet River, and               ty, Texas, identified in subsection (a)(25) to




SSpencer on DSK126QN23PROD with HOUSE
                                                (1) EMERGENCY STREAMBANK AND SHORELINE                other waterways in the vicinity of Chicago,            be a continuation of the study carried out
                                              PROTECTION.—Notwithstanding section 14 of               Illinois.                                              for Sabine Pass to Galveston Bay, Texas, au-
                                              the Flood Control Act of 1946 (33 U.S.C. 701r),           (8) FOX RIVER, ILLINOIS.—Project for flood           thorized by a resolution of the Committee on
                                              there is authorized to be appropriated to               risk management, Fox River, Illinois.                  Environment and Public Works of the Sen-
                                              carry out such section $25,500,000 for each of            (9) LOWER MISSOURI RIVER, KANSAS.—                   ate, approved June 23, 2004, and funded by
                                              fiscal years 2021 through 2024.                         Project for bank stabilization and naviga-             title IV of division B of the Bipartisan Budg-
                                                (2) STORM AND HURRICANE RESTORATION AND               tion, Lower Missouri River, Sioux City, Kan-           et Act of 2018, under the heading ‘‘CORPS OF
                                              IMPACT    MINIMIZATION     PROGRAM.—Notwith-            sas.                                                   ENGINEERS—CIVIL—DEPARTMENT                 OF




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00045   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6952                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              THE ARMY—CONSTRUCTION’’ (Public Law                       (27) Project for ecosystem restoration, Cen-         100–581 (102 Stat. 2944), Oregon and Wash-
                                              115–123; 132 Stat. 76).                                 tral and Southern Florida Project Canal 111            ington.
                                              SEC. 202. EXPEDITED COMPLETIONS.                        (C–111), South Dade County, Florida.                     (53) Project for flood risk management,
                                                (a) FEASIBILITY REPORTS.—The Secretary                  (28) Project for ecosystem restoration,              Dorchester County, South Carolina.
                                              shall expedite the completion of a feasibility          Lake Okeechobee, Florida.                                (54) Project for navigation, Georgetown
                                              study for each of the following projects, and             (29) Project for ecosystem restoration,              Harbor, South Carolina.
                                              if the Secretary determines that the project            Western Everglades, Florida.                             (55) Project for hurricane and storm dam-
                                              is justified in a completed report, may pro-              (30) Project for flood risk management,              age risk reduction, Myrtle Beach, South
                                              ceed directly to preconstruction planning,              Hanapepe River, Kauai, Hawaii.                         Carolina.
                                              engineering, and design of the project:                   (31) Project for flood risk management,                (56) Project to modify the projects for navi-
                                                (1) Project for navigation, Florence, Ala-            Wailupe Stream, Oahu, Hawaii.                          gation and other purposes, Old Hickory Lock
                                              bama.                                                     (32) Project for flood risk management,              and Dam and the Cordell Hull Dam and Res-
                                                (2) Project to modify the project for navi-           Waimea River, Kauai, Hawaii, being carried             ervoir, Cumberland River, Tennessee, au-
                                              gation,    Tennessee-Tombigbee        Waterway,         out under section 205 of the Flood Control             thorized by the Act of July 24, 1946 (chapter
                                              Alabama, Kentucky, Mississippi, and Ten-                Act of 1948 (33 U.S.C. 701s).                          595, 60 Stat. 636), to add flood risk manage-
                                              nessee.                                                   (33) Project for comprehensive hurricane             ment as an authorized purpose.
                                                (3) Project for shoreline stabilization,              and storm damage risk reduction and shore-               (57) Project for flood risk management,
                                              Aunu‘u Harbor, American Samoa.                          line erosion protection, Chicago, Illinois, au-        Buffalo Bayou, Texas.
                                                (4) Project for shoreline stabilization,              thorized by section 101(a)(12) of the Water              (58) Project for flood risk management,
                                              Tutuila Island, American Samoa.                         Resources Development Act of 1996 (110 Stat.           ecosystem restoration, water supply, and re-
                                                (5) Project for flood risk management,                3664; 113 Stat. 302).                                  lated purposes, Lower Rio Grande River,
                                              Lower Santa Cruz River, Arizona.                          (34) Project for flood risk management,              Cameron County, Texas, carried out pursu-
                                                (6) Project for flood risk management, Rio            Wheaton, DuPage County, Illinois.                      ant to the resolution of the Committee on
                                              de Flag, Arizona.                                         (35) Project for flood damage reduction,             Transportation and Infrastructure of the
                                                (7) Project for flood risk management,                ecosystem restoration, and recreation, Blue            House of Representatives adopted on May 21,
                                              Tonto Creek, Gila River, Arizona.                       River Basin, Kansas City, Kansas, carried              2003 (docket number 2710).
                                                (8) Project for flood control, water con-             out pursuant to the resolution of the Com-               (59) Project for hurricane and storm dam-
                                              servation, and related purposes, Coyote Val-            mittee on Transportation and Infrastructure            age risk reduction and shoreline erosion pro-
                                              ley Dam, California.                                    of the House of Representatives adopted on             tection, Bolongo Bay, St. Thomas, United
                                                (9) Project for shoreline stabilization, Del          September 24, 2008 (docket number 2803).               States Virgin Islands.
                                              Mar Bluffs, San Diego County, California,                 (36) Project for flood control, Amite River            (60) Project for water supply and eco-
                                              carried out pursuant to the resolution of the           and Tributaries east of the Mississippi River,         system restoration, Howard Hanson Dam,
                                              Committee on Transportation and Infra-                  Louisiana.                                             Washington.
                                              structure of the House of Representatives                 (37) Project for coastal storm risk manage-            (61) Project for ecosystem restoration,
                                              adopted on April 22, 1999 (docket number                ment, Upper Barataria Basin, Louisiana.                Puget Sound, Washington.
                                              2598).                                                    (38) Project for navigation, Kent Narrows              (62) Project for navigation, Seattle Harbor,
                                                (10) Project for flood damage reduction and           and Chester River, Queen Anne’s County,
                                                                                                                                                             Washington.
                                              ecosystem restoration, Del Rosa Channel,                Maryland.
                                                                                                                                                               (63) Project for navigation, Tacoma Har-
                                              city of San Bernardino, California.                       (39) Project to replace the Bourne and Sag-
                                                                                                                                                             bor, Washington.
                                                (11) Project for flood risk management,               amore Bridges, Cape Cod, Massachusetts.
                                                                                                                                                               (64) Project for dam safety remediation,
                                              Lower Cache Creek, California.                            (40) Project for flood risk management,
                                                                                                                                                             Bluestone Dam, West Virginia.
                                                (12) Project for flood damage reduction and           ecosystem     restoration,    and   recreation,
                                                                                                                                                               (65) Project to modify the project for navi-
                                              ecosystem restoration, Mission-Zanja Chan-              Lower St. Croix River, Minnesota, carried
                                                                                                                                                             gation, Milwaukee Harbor, Wisconsin.
                                              nel, cities of San Bernardino and Redlands,             out pursuant to the resolution of the Com-
                                              California.                                             mittee on Transportation and Infrastructure              (b)    POST-AUTHORIZATION        CHANGE    RE-
                                                (13) Project for flood risk management,               of the House of Representatives adopted on             PORTS.—The Secretary shall expedite com-
                                              Napa, California.                                       September 25, 2002 (docket number 2705).               pletion of a post-authorization change report
                                                (14) Project for shoreline protection,                  (41) Project to deepen the project for navi-         for the following projects:
                                              Oceanside, California, authorized pursuant              gation, Gulfport Harbor, Mississippi, author-            (1) Project for ecosystem restoration, Tres
                                              to section 414 of the Water Resources Devel-            ized by section 202(a) of the Water Resources          Rios, Arizona.
                                              opment Act of 2000 (114 Stat. 2636; 121 Stat.           Development Act of 1986 (100 Stat. 4094).                (2) Project for flood risk management, Des
                                              1176).                                                    (42) Project for navigation, Shark River,            Moines Levee System, including Birdland
                                                (15) Project for ecosystem restoration and            New Jersey.                                            Park Levee, Des Moines and Raccoon Rivers,
                                              water conservation, Prado Basin, Orange,                  (43) Project for navigation, Goldsmith               Des Moines, Iowa.
                                              Riverside, and San Bernardino counties,                 Inlet, New York.                                         (c) WATERSHED AND RIVER BASIN ASSESS-
                                              California.                                               (44) Project for navigation, Lake Montauk            MENTS.—The Secretary shall expedite the
                                                (16) Project for water conservation and               Harbor, New York.                                      completion of an assessment under section
                                              water supply, Redbank and Fancher Creeks,                 (45) Project for rehabilitation of Lock E–32,        729 of the Water Resources Development Act
                                              California.                                             Erie Canal, Pittsford, New York.                       of 1986 (33 U.S.C. 2267a) for the following:
                                                (17) Project for coastal storm damage re-               (46) Project for navigation and shoreline              (1) Kansas River Basin, Kansas.
                                              duction, San Diego County shoreline, Cali-              stabilization, Reel Point Preserve, New                  (2) Merrimack River Basin, Massachusetts.
                                              fornia.                                                 York, carried out pursuant to the resolution             (3) Pascagoula River Basin, Mississippi.
                                                (18) Project to modify the project for navi-          of the Committee on Transportation and In-               (4) Tuscarawas River Basin, Ohio.
                                              gation, San Francisco Bay to Stockton, Cali-            frastructure of the House of Representatives             (5) Lower Fox River Basin, Wisconsin.
                                              fornia.                                                 adopted on May 2, 2007 (docket number 2775).             (6) Upper Fox River Basin and Wolf River
                                                (19) Project for flood risk management,                 (47) Project for flood risk management,              Basin, Wisconsin.
                                              San Francisquito Creek, California.                     Rondout Creek-Wallkill River Watershed,
                                                                                                                                                               (d) DISPOSITION STUDIES.—The Secretary
                                                (20) Project to modify the Seven Oaks                 New York, carried out pursuant to the reso-
                                                                                                                                                             shall expedite the completion of a disposi-
                                              Dam, California, portion of the project for             lution of the Committee on Transportation
                                                                                                                                                             tion study, carried out under section 216 of
                                              flood control, Santa Ana River Mainstem,                and Infrastructure of the House of Rep-
                                                                                                                                                             the Flood Control Act of 1970 (33 U.S.C. 549a),
                                              California, authorized by section 401(a) of the         resentatives adopted on May 2, 2007 (docket
                                                                                                                                                             for the project for Salinas Reservoir (Santa
                                              Water Resources Development Act of 1986                 number 2776).
                                                                                                                                                             Margarita Lake), California.
                                              (100 Stat. 4113; 101 Stat. 1329–111; 104 Stat.            (48) Project for ecosystem restoration and
                                              4611; 110 Stat. 3713; 121 Stat. 1115), to include       hurricane and storm damage risk reduction,               (e) REALLOCATION STUDIES.—The Secretary
                                              water conservation as an authorized purpose.            Spring Creek South (Howard Beach), Queens,             shall expedite the completion of a study for
                                                (21) Project for coastal storm damage re-             New York.                                              the reallocation of water supply storage, car-
                                              duction, Southern California.                             (49) Project for ecosystem restoration,              ried out in accordance with section 301 of the
                                                (22) Project for water storage, Halligan              Hood River at the confluence with the Co-              Water Supply Act of 1958 (43 U.S.C. 390b), for
                                              Dam, Colorado.                                          lumbia River, Oregon.                                  the following:
                                                (23) Project for flood risk management,                 (50) Project to resolve increased silting and          (1) Aquilla Lake, Texas.




SSpencer on DSK126QN23PROD with HOUSE
                                              East Hartford Levee System, Connecticut.                shoaling adjacent to the Federal channel,                (2) Lake Whitney, Texas.
                                                (24) Project for flood risk management,               Port of Bandon, Coquille River, Oregon.                  (f) ECONOMIC REEVALUATION REPORT.—The
                                              Fairfield and New Haven Counties, Con-                    (51) Project for flood control, 42nd Street          Secretary shall expedite the completion of
                                              necticut.                                               Levee, Springfield, Oregon, being carried out          the economic reevaluation report for the
                                                (25) Project for navigation, Guilford Harbor          under section 205 of the Flood Control Act of          navigation and sustainability program car-
                                              and Sluice Channel, Connecticut.                        1948 (33 U.S.C. 701s).                                 ried out pursuant to title VIII of the Water
                                                (26) Project for flood risk management,                 (52) Project for construction of Tribal              Resources Development Act of 2007 (33 U.S.C.
                                              Hartford Levee System, Connecticut.                     housing authorized by title IV of Public Law           652 note).




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00046   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                        H6953
                                              SEC. 203. EXPEDITED MODIFICATIONS OF EXIST-             during which a non-Federal interest may                  (U) A project for repair of a sheet pile wall
                                                          ING FEASIBILITY STUDIES.                    submit a proposal to be considered for inclu-          and east breakwater, Great Sodus Bay, New
                                                (a) IN GENERAL.—The Secretary shall expe-             sion in an annual report pursuant to section           York.
                                              dite the completion of the following feasi-             7001(b) of the Water Resources Reform and                (V) A feasibility study for the project for
                                              bility studies, as modified by this section,            Development Act of 2014 (33 U.S.C. 2282d(b)),          navigation, Port of Oswego, New York.
                                              and if the Secretary determines that a                  the Secretary is authorized to provide assist-           (W) A feasibility study for potential
                                              project that is the subject of the feasibility          ance in accordance with section 1104(b) of the         projects for the rehabilitation of the Glens
                                              study is justified in a completed report, may                                                                  Falls Feeder Canal, which begins at the
                                                                                                      Water Resources Development Act of 2018 (33
                                              proceed directly to preconstruction plan-                                                                      Feeder Dam intersection with the Hudson
                                                                                                      U.S.C. 2282d note) to the non-Federal inter-
                                              ning, engineering, and design of the project:                                                                  River in Queensbury, New York, and runs to
                                                                                                      est of a project proposal described in para-
                                                (1) SAN FRANCISCO BAY, CALIFORNIA.—The                                                                       the confluence of the Old Champlain Canal
                                              study for flood risk reduction authorized by            graph (2).
                                                                                                        (2) PROJECT PROPOSALS DESCRIBED.—A                   in Kingsbury, New York.
                                              section 142 of the Water Resources Develop-                                                                      (X) A feasibility study to determine wheth-
                                              ment Act of 1976 (90 Stat. 2930), is modified           project proposal referred to in paragraph (1)
                                                                                                      is a proposal for any of the following:                er the purchase of additional flood ease-
                                              to authorize the Secretary to—                                                                                 ments, changes in lake level management,
                                                (A) investigate the ocean shoreline of San              (A) A feasibility study for a fish passage
                                                                                                      for ecosystem restoration, Lower Alabama               additional levee infrastructure, or imple-
                                              Mateo, San Francisco, and Marin Counties                                                                       mentation of other flood risk management
                                              for the purposes of providing flood protection          River, Alabama.
                                                                                                        (B) A feasibility study for dredged material         or containment mechanisms in the Arkansas
                                              against tidal and fluvial flooding;                                                                            River Basin, Oklahoma, would benefit local
                                                (B) with respect to the bay and ocean                 disposal management activities, Port of
                                                                                                                                                             communities by reducing flood risks around
                                              shorelines of San Mateo, San Francisco, and             Florence, Alabama.
                                                                                                                                                             water resources development projects of the
                                              Marin Counties, investigate measures to                   (C) A feasibility study for a project for
                                                                                                                                                             Corps of Engineers in a range of different
                                              adapt to rising sea levels; and                         flood risk management, Sikorsky Memorial
                                                                                                                                                             flood scenarios.
                                                (C) with respect to the bay and ocean                 Airport, Bridgeport, Connecticut.
                                                                                                                                                               (Y) A feasibility study on increasing the
                                              shorelines, and streams running to the bay                (D) A feasibility study for a project to de-
                                                                                                                                                             frequency and depth of dredging assistance
                                              and ocean shorelines, of San Mateo, San                 sign and construct the Naugatuck River
                                                                                                                                                             from the Corps of Engineers at the Port of
                                              Francisco, and Marin Counties, investigate              Greenway Trail, a multiuse trail on Federal            Astoria, located at the mouth of the Colum-
                                              the effects of proposed flood protection and            land between Torrington and Derby, Con-                bia River, Oregon.
                                              other measures or improvements on—                      necticut.                                                (b) FEASIBILITY ANALYSIS.—
                                                (i) the local economy;                                  (E) A feasibility study for a project for              (1) IN GENERAL.—Subject to the avail-
                                                (ii) habitat restoration, enhancement, or             coastal and flood risk management, Strat-              ability of appropriations, the Secretary is
                                              expansion efforts or opportunities;                     ford, Connecticut.                                     authorized to review a project proposal de-
                                                (iii) public infrastructure protection and              (F) A feasibility study for projects for flood       scribed in paragraph (2) and issue a report to
                                              improvement;                                            risk management, Woodbridge, Connecticut.              the Committee on Environment and Public
                                                (iv) stormwater runoff capacity and con-                (G) The project for flood risk management,           Works of the Senate and the Committee on
                                              trol measures, including those that may                 Bloomington, Indiana.                                  Transportation and Infrastructure of the
                                              mitigate flooding;                                        (H) The project for flood risk management,           House of Representatives on whether a modi-
                                                (v) erosion of beaches and coasts; and                Gary, Indiana.                                         fication to the project that is the subject of
                                                (vi) any other measures or improvements                 (I) Modification of the project for beach            the proposal is necessary and recommended
                                              relevant to adapting to rising sea levels.              erosion and hurricane protection, Grand Isle,          to carry out the authorized purposes of such
                                                (2) SACRAMENTO RIVER, SOUTHERN SUTTER                 Louisiana, to include periodic beach nourish-          project.
                                              COUNTY, CALIFORNIA.—The study for flood                 ment.                                                    (2) PROJECT PROPOSALS DESCRIBED.—A
                                              control and allied purposes for the Sac-                  (J) A feasibility study for a project for            project proposal referred to in paragraph (1)
                                              ramento River Basin, authorized by section              flood     risk   management,       Cataouatche         is a proposal to modify any of the following:
                                              209 of the Flood Control Act of 1962 (76 Stat.          Subbasin area of the west bank of Jefferson              (A) The project for environmental infra-
                                              1197), is modified to authorize the Secretary           Parish, Louisiana.                                     structure, City of Sheffield, Alabama, au-
                                              to conduct a study for flood risk manage-                 (K) A feasibility study for projects for             thorized pursuant to section 219(f)(78) of the
                                              ment, southern Sutter County between the                flood risk management and storm damage                 Water Resources Development Act of 1992
                                              Sacramento River and Sutter Bypass, Cali-               reduction in the Hoey’s Basin area of the              (106 Stat. 4835; 113 Stat. 335; 121 Stat. 1258; 130
                                              fornia.                                                 east bank of Jefferson Parish, Louisiana, in-          Stat. 1687).
                                                (3) SALTON SEA, CALIFORNIA.—In carrying               cluding a study of the ‘‘pump to the river’’             (B) The project for environmental infra-
                                              out the program to implement projects to re-            concept.                                               structure, Calaveras County, California,
                                              store the Salton Sea, California, authorized              (L) A feasibility study for a project for            under section 219(f)(86) of the Water Re-
                                              by section 3032 of the Water Resources Devel-           flood risk management, Hoosic River, Massa-            sources Development Act of 1992 (106 Stat.
                                              opment Act of 2007 (121 Stat. 1113; 130 Stat.           chusetts.                                              4835; 113 Stat. 335; 121 Stat. 1259).
                                              1677), the Secretary is authorized to carry               (M) Modification of the project for naviga-            (C) The project for environmental infra-
                                              out a study for the construction of a perim-            tion, River Rouge, Michigan.                           structure, Charlotte County, Florida, au-
                                              eter lake, or a northern or southern subset               (N) A project to extend dredging of the              thorized by section 219(f)(121) of the Water
                                              thereof, for the Salton Sea, California.                South Haven Harbor, Michigan, to include               Resources Development Act of 1992 (106 Stat.
                                                (4) NEW YORK AND NEW JERSEY HARBOR AND                the former turning basin.                              4835; 113 Stat. 335; 121 Stat. 1261).
                                              TRIBUTARIES, NEW YORK AND NEW JERSEY.—                    (O) Modification of the project for flood              (D) The Mississippi River and Tributaries
                                              The study for flood and storm damage reduc-             risk management, Upper Rouge River,                    project authorized by the first section of the
                                              tion for the New York and New Jersey Har-               Wayne County, Michigan.                                Act of May 15, 1928 (33 U.S.C. 702a), to include
                                              bor and Tributaries project, authorized by                (P) A project for aquatic and riparian eco-          the portion of the Ouachita River Levee Sys-
                                              the Act of June 15, 1955 (chapter 140, 69 Stat.         system restoration, Line Creek, Riverside,             tem at and below Monroe, Louisiana, to
                                              132), and being carried out pursuant to the             Missouri.                                              Caldwell Parish, Louisiana.
                                              Disaster Relief Appropriations Act, 2013                  (Q) A feasibility study for projects for eco-          (E) The project for environmental infra-
                                              (Public Law 113–2), is modified to require the          system restoration, Bangert Island, St.                structure, Central New Mexico, authorized
                                              Secretary to—                                           Charles, Missouri, related to channels and             by section 593 of the Water Resources Devel-
                                                (A) evaluate and address the impacts of               aquatic habitats.                                      opment Act of 1999 (113 Stat. 380; 119 Stat.
                                              low-frequency precipitation and sea-level                 (R) A study of the resiliency of the Alle-           2255).
                                              rise on the study area;                                 gheny Reservoir, New York, in consultation               (F) The project for environmental infra-
                                                (B) consult with affected communities; and            with the Seneca Nation.                                structure, Village of Whitehall, New York,
                                                (C) ensure the study is carried out in ac-              (S) A feasibility study for the rehabilita-          authorized pursuant to section 542 of the
                                              cordance with section 1001 of the Water Re-             tion of the tainter gates and guard gate,              Water Resources Development Act of 2000
                                              sources Reform and Development Act of 2014              Caughdenoy Dam, New York, including an                 (114 Stat. 2671; 121 Stat. 1150).
                                              (33 U.S.C. 2282c).                                      evaluation of the rehabilitation work nec-               (G) The project for environmental infra-
                                                (b) CONSIDERATIONS.—Where appropriate,                essary to extend the service life of those             structure, Ohio and North Dakota, author-
                                              the Secretary may use the authority pro-                structures, such as—                                   ized by section 594 of the Water Resources
                                              vided by section 216 of the Flood Control Act             (i) improvements to the hydraulic effi-              Development Act of 1999 (113 Stat. 383; 121




SSpencer on DSK126QN23PROD with HOUSE
                                              of 1970 (33 U.S.C. 549a) to carry out this sec-         ciency of the gate systems;                            Stat. 1140; 121 Stat. 1944).
                                              tion.                                                     (ii) improvements to the concrete founda-              (H) The project for flood risk management
                                              SEC. 204. ASSISTANCE TO NON-FEDERAL SPON-               tion and gate support structures; and                  and water supply, Tenkiller Ferry Lake, Ar-
                                                          SORS; FEASIBILITY ANALYSIS.                   (iii) any other improvements the Secretary           kansas River Basin, Oklahoma, authorized
                                                (a) ASSISTANCE TO NON-FEDERAL SPON-                   determines to be necessary.                            by section 4 of the Act of June 28, 1938 (chap-
                                              SORS.—                                                    (T) A project for repairs to the West Pier           ter 795, 52 Stat. 1218), to modify water stor-
                                                (1) IN GENERAL.—Subject to the avail-                 and West Barrier Bar, Little Sodus Bay Har-            age to provide for a sufficient quantity of
                                              ability of appropriations, during the period            bor, Cayuga County, New York.                          water supply storage space in the inactive




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00047   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6954                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                              pool storage to support the fishery down-                 (1) provides an update on the study for              Works of the Senate and the Committee on
                                              stream from Tenkiller Reservoir.                        flood risk management and riverbank sta-               Transportation and Infrastructure of the
                                                (I) The project for environmental infra-              bilization, Selma, Alabama, authorized by              House of Representatives a report on the sta-
                                              structure, Athens, Tennessee, authorized by             resolutions of the Committees on Public                tus of the study under subsection (a), on a
                                              section 219(f)(254) of the Water Resources De-          Works and Rivers and Harbors of the House              State-by-State basis, including information
                                              velopment Act of 1992 (106 Stat. 4835; 113              of Representatives on June 7, 1961, and April          on the engagement of the Corps of Engineers
                                              Stat. 335; 121 Stat. 1267).                             28, 1936, respectively, the completion of              with non-Federal interests, including de-
                                                (J) The project for environmental infra-              which the Secretary was required to expedite           tailed lists of all meetings and decision out-
                                              structure, Blaine, Tennessee, authorized by             by section 1203 of the Water Resources Devel-          comes associated with those engagements.’’.
                                              section 219(f)(255) of the Water Resources De-          opment Act of 2018 (132 Stat. 3803); and               SEC. 209. COMPREHENSIVE STUDY OF THE SAC-
                                              velopment Act of 1992 (106 Stat. 4835; 113                (2) identifies project alternatives necessary                    RAMENTO RIVER, YOLO BYPASS,
                                              Stat. 335; 121 Stat. 1267).                             to—                                                                CALIFORNIA.
                                                (K) The project for environmental infra-                (A) assure the preservation of cultural and            (a) COMPREHENSIVE STUDY.—The Secretary
                                              structure, Claiborne County, Tennessee, au-             historic values associated with national his-          shall conduct a comprehensive study of the
                                              thorized by section 219(f)(256) of the Water            toric landmarks within the study area; and             Sacramento River in the vicinity of the Yolo
                                              Resources Development Act of 1992 (106 Stat.              (B) provide flood risk management for eco-           Bypass System, California, to identify ac-
                                              4835; 113 Stat. 335; 121 Stat. 1267).                   nomically disadvantaged communities with-              tions to be undertaken by the Secretary for
                                                (L) The project for environmental infra-              in the study area.                                     the comprehensive management of the Yolo
                                              structure, Giles County, Tennessee, author-                                                                    Bypass System for the purposes of flood risk
                                                                                                      SEC. 206. REPORT ON CORPS OF ENGINEERS FA-
                                              ized by section 219(f)(257) of the Water Re-                        CILITIES IN APPALACHIA.                    management, ecosystem restoration, water
                                              sources Development Act of 1992 (106 Stat.                                                                     supply, hydropower, and recreation.
                                                                                                        (a) IN GENERAL.—Not later than 180 days                (b) CONSULTATION AND USE OF EXISTING
                                              4835; 113 Stat. 335; 121 Stat. 1267).                   after the date of enactment of this Act, the
                                                (M) The project for environmental infra-                                                                     DATA.—
                                                                                                      Secretary, in collaboration with the Appa-               (1) CONSULTATION.—In conducting the com-
                                              structure, Grainger County, Tennessee, au-              lachian Regional Commission established by
                                              thorized by section 219(f)(258) of the Water                                                                   prehensive study under subsection (a), the
                                                                                                      section 14301(a) of title 40, United States            Secretary shall consult with the Governor of
                                              Resources Development Act of 1992 (106 Stat.            Code, shall submit to the Committee on En-
                                              4835; 113 Stat. 335; 121 Stat. 1267).                                                                          the State of California, applicable Federal,
                                                                                                      vironment and Public Works of the Senate               State, and local agencies, non-Federal inter-
                                                (N) The project for environmental infra-              and the Committee on Transportation and
                                              structure, Hamilton County, Tennessee, au-                                                                     ests, the Yolo Bypass and Cache Slough
                                                                                                      Infrastructure of the House of Representa-             Partnership, and other stakeholders.
                                              thorized by section 219(f)(259) of the Water
                                                                                                      tives a report that identifies each Corps of             (2) USE OF EXISTING DATA AND PRIOR STUD-
                                              Resources Development Act of 1992 (106 Stat.
                                                                                                      Engineers facility that—                               IES.—To the maximum extent practicable
                                              4835; 113 Stat. 335; 121 Stat. 1267).
                                                                                                        (1) is located within a distressed county or         and where appropriate, the Secretary may—
                                                (O) The project for environmental infra-
                                                                                                      an at-risk county (as designated by the Ap-              (A) make use of existing data provided to
                                              structure, Harrogate, Tennessee, authorized
                                                                                                      palachian Regional Commission pursuant to              the Secretary by the entities identified in
                                              by section 219(f)(260) of the Water Resources
                                                                                                      subparagraph (A) or (B) of section 14526(a)(1),        paragraph (1); and
                                              Development Act of 1992 (106 Stat. 4835; 113
                                                                                                      of title 40, United States Code), including in           (B) incorporate—
                                              Stat. 335; 121 Stat. 1267).
                                                                                                      counties that are experiencing high unem-                (i) relevant information from prior studies
                                                (P) The project for environmental infra-
                                                                                                      ployment or job loss; and                              and projects carried out by the Secretary
                                              structure, Johnson County, Tennessee, au-
                                              thorized by section 219(f)(261) of the Water              (2) could be improved for purposes of eco-           within the study area; and
                                              Resources Development Act of 1992 (106 Stat.            nomic development, recreation, or other                  (ii) the latest technical data and scientific
                                              4835; 113 Stat. 335; 121 Stat. 1267).                   uses.                                                  approaches to changing hydrologic and cli-
                                                (Q) The project for environmental infra-                (b) HYDROPOWER FACILITIES.—                          matic conditions.
                                              structure, Knoxville, Tennessee, authorized               (1) IDENTIFICATION OF POTENTIAL HYDRO-                 (c) RECOMMENDATIONS.—
                                                                                                      POWER DEVELOPMENT.—The Secretary shall                   (1) IN GENERAL.—In conducting the com-
                                              by section 219(f)(262) of the Water Resources
                                              Development Act of 1992 (106 Stat. 4835; 113            include in the report submitted under sub-             prehensive study under subsection (a), the
                                              Stat. 335; 121 Stat. 1267).                             section (a) the identification of any existing         Secretary may develop a recommendation to
                                                (R) The project for environmental infra-              nonpowered dams, located within a dis-                 Congress for—
                                              structure, Lewis, Lawrence, and Wayne                   tressed county or an at-risk county, with the            (A) the construction of a water resources
                                              Counties, Tennessee, authorized by section              potential to be used to test, evaluate, pilot,         development project;
                                              219(f)(264) of the Water Resources Develop-             demonstrate, or deploy hydropower or en-                 (B) the structural or operational modifica-
                                              ment Act of 1992 (106 Stat. 4835; 113 Stat. 335;        ergy storage technologies.                             tion of an existing water resources develop-
                                              121 Stat. 1268).                                          (2) INFORMATION.—In carrying out this sub-           ment project;
                                                (S) The project for environmental infra-              section, the Secretary may use any informa-              (C) additional monitoring of, or adaptive
                                              structure, Nashville, Tennessee, authorized             tion developed pursuant to section 1206 of             management measures to carry out with re-
                                              by section 219(f)(263) of the Water Resources           the Water Resources Development Act of                 spect to, existing water resources develop-
                                              Development Act of 1992 (106 Stat. 4835; 113            2018 (132 Stat. 3806).                                 ment projects, to respond to changing hydro-
                                              Stat. 335; 121 Stat. 1267).                               (3) COORDINATION.—In carrying out para-              logic and climatic conditions; or
                                                (T) The project for environmental infra-              graph (1), the Secretary shall coordinate                (D) geographic areas within the Yolo By-
                                              structure, Oak Ridge, Tennessee, authorized             with any relevant National Laboratories.               pass System for additional study by the Sec-
                                              by section 219(f)(265) of the Water Resources           SEC. 207. ADDITIONAL STUDIES UNDER NORTH               retary.
                                              Development Act of 1992 (106 Stat. 4835; 113                        ATLANTIC COAST COMPREHENSIVE                 (2) ADDITIONAL CONSIDERATIONS.—Any fea-
                                                                                                                  STUDY.
                                              Stat. 335; 121 Stat. 1268).                                                                                    sibility study carried out pursuant to a rec-
                                                (U) The project for environmental infra-                (a) IN GENERAL.—The Secretary shall carry            ommendation under paragraph (1)(D) shall be
                                              structure, Plateau Utility District, Morgan             out a study to determine the feasibility of a          considered to be a continuation of the com-
                                              County, Tennessee, authorized by section                project for hurricane and storm damage risk            prehensive study authorized under sub-
                                              219(f)(266) of the Water Resources Develop-             reduction for any major metropolitan area              section (a).
                                              ment Act of 1992 (106 Stat. 4835; 113 Stat. 335;        located in the study area for the comprehen-             (d) COMPLETION OF STUDY; REPORT TO CON-
                                              121 Stat. 1268).                                        sive study authorized under the heading ‘‘De-          GRESS.—Not later than 3 years after the date
                                                (V) The authorized funding level for crit-            partment of the Army—Corps of Engineers—               of enactment of this section, the Secretary
                                              ical restoration projects, Lake Champlain               Civil—Investigations’’ under the Disaster              shall submit to the Committee on Transpor-
                                              watershed, Vermont and New York, author-                Relief Appropriations Act, 2013 (Public Law            tation and Infrastructure of the House of
                                              ized by section 542 of the Water Resources              113–2) that was not included in a high-risk            Representatives and the Committee on Envi-
                                              Development Act of 2000 (114 Stat. 2671; 121            focus area identified in the study.                    ronment and Public Works of the Senate a
                                              Stat. 1150).                                              (b) TREATMENT.—A study carried out under             report detailing—
                                                (W) The project for environmental infra-              subsection (a) shall be considered to be a               (1) the results of the comprehensive study
                                              structure, Eastern Shore and Southwest Vir-             continuation of the comprehensive study de-            conducted under subsection (a), including
                                              ginia, authorized by section 219(f)(10) of the          scribed in that subsection.                            any recommendations developed under sub-
                                              Water Resources Development Act of 1992                 SEC. 208. SOUTH ATLANTIC COASTAL STUDY.                section (c);
                                              (106 Stat. 4835; 113 Stat. 335; 121 Stat. 1255).          Section 1204 of the Water Resources Devel-             (2) any additional, site-specific areas with-




SSpencer on DSK126QN23PROD with HOUSE
                                              SEC. 205. SELMA, ALABAMA.                               opment Act of 2016 (130 Stat. 1685) is amended         in the Yolo Bypass System where additional
                                                Not later than 180 days after the date of             by adding at the end the following:                    study for flood risk management or eco-
                                              enactment of this Act, the Secretary shall                ‘‘(d) ANNUAL REPORTS.—Not later than 180             system restoration projects is recommended
                                              submit to the Committee on Transportation               days after the enactment of the Water Re-              by the Secretary; and
                                              and Infrastructure of the House of Rep-                 sources Development Act of 2020, and not                 (3) any interim actions relating to existing
                                              resentatives and the Committee on Environ-              less frequently than annually thereafter               water resources development projects under-
                                              ment and Public Works of the Senate a re-               until 2025, the Secretary shall submit to the          taken by the Secretary during the study pe-
                                              port that—                                              Committee on Environment and Public                    riod.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00048   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6955
                                                (e) DEFINITIONS.—In this section:                       (D) the prevention and control of invasive            actions to be undertaken by the Secretary,
                                                (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo               species and the effects of invasive species;            under existing authorities or after congres-
                                              Bypass System’’ means the system of weirs,              and                                                     sional authorization, for the comprehensive
                                              levees, bypass structures, and other water                (E) recreation associated with water re-              management of the basin for the purposes
                                              resources development projects in Califor-              sources development projects;                           of—
                                              nia’s Sacramento River Valley, extending                  (2) prioritize actions necessary to protect             (A) hurricane and storm damage reduction,
                                              from the Fremont Weir near Woodland, Cali-              critical public infrastructure, communities,            flood risk management, structural and non-
                                              fornia, to the Sacramento River near Rio                and critical natural or cultural resources;             structural flood control, and floodplain man-
                                              Vista, California, authorized pursuant to sec-          and                                                     agement strategies;
                                              tion 2 of the Act of March 1, 1917 (chapter               (3) to the maximum extent practicable and               (B) navigation;
                                              144; 39 Stat. 949).                                     where appropriate, utilize existing data pro-             (C) ecosystem and environmental restora-
                                                (2) YOLO BYPASS AND CACHE SLOUGH PART-                vided to the Secretary by Federal and State             tion;
                                              NERSHIP.—The term ‘‘Yolo Bypass and Cache               agencies, Indian Tribes, and other stake-                 (D) water supply;
                                              Slough Partnership’’ means the group of par-            holders, including data obtained through                  (E) hydropower production;
                                              ties to the Yolo Bypass and Cache Slough                other Federal programs.                                   (F) recreation; and
                                              Memorandum of Understanding, effective                    (b)      RECOMMENDATIONS;        ADDITIONAL             (G) other purposes as determined by the
                                              May 2016, regarding collaboration and co-               STUDY.—                                                 Secretary.
                                              operation in the Yolo Bypass and Cache                    (1) IN GENERAL.—In carrying out the com-                (2) DEVELOPMENT.—In conducting the com-
                                              Slough region.                                          prehensive assessment described in sub-                 prehensive study under paragraph (1), the
                                              SEC.   210.LAKE OKEECHOBEE REGULATION                   section (a), the Secretary may make a rec-              Secretary shall investigate—
                                                         SCHEDULE, FLORIDA.                           ommendation to Congress for—                              (A) the construction of new water re-
                                                (a) IN GENERAL.—In carrying out the re-                 (A) the construction of a water resources             sources development projects;
                                              view of the Lake Okeechobee regulation                  development project;                                      (B) structural and operational modifica-
                                              schedule pursuant to section 1106 of the                  (B) the structural or operational modifica-           tions to completed water resources develop-
                                              Water Resources Development Act of 2018                 tion of an existing water resources develop-            ment projects within the study area;
                                              (132 Stat. 3773), the Secretary shall—                  ment project;                                             (C) projects proposed in the comprehensive
                                                (1) evaluate the implications of prohibiting            (C) additional monitoring of, or adaptive             coastal protection master plan entitled
                                              releases from Lake Okeechobee through the               management measures to carry out with re-               ‘‘Louisiana’s Comprehensive Master Plan for
                                              S–308 and S–80 lock and dam structures, and             spect to, existing water resources develop-             a Sustainable Coast’’, prepared by the State
                                              evaluate separately the implications of pro-            ment projects, to respond to changing hydro-            of Louisiana and accepted by the Louisiana
                                              hibiting high volume releases through the S–            logic and climatic conditions; or                       Coastal Protection and Restoration Author-
                                              77, S–78, and S–79 lock and dam structures,               (D) geographic areas within the Great                 ity (including any subsequent amendments
                                              on the operation of the lake in accordance              Lakes System for additional study by the                or revisions), including—
                                              with authorized purposes and seek to mini-              Secretary.                                                (i) Ama sediment diversion;
                                              mize unnecessary releases to coastal estu-                (2) FOCUS AREAS.—In addition to carrying                (ii) Union freshwater diversion;
                                              aries; and                                              out subsection (a), to contribute to the com-             (iii)   increase   Atchafalaya    flow    to
                                                (2) to the maximum extent practicable, co-            prehensive assessment described in such sub-            Terrebonne; and
                                              ordinate with the ongoing efforts of Federal            section, the Secretary is authorized to con-              (iv) Manchac Landbridge diversion;
                                              and State agencies responsible for moni-                duct feasibility studies for—                             (D) natural features and nature-based fea-
                                              toring, forecasting, and notification of                  (A) the project for coastal storm resil-              tures, including levee setbacks and instream
                                              cyanobacteria levels in Lake Okeechobee.                iency, Lake Ontario shoreline, New York;                and floodplain restoration;
                                                (b) MONTHLY REPORT.—Each month, the                   and                                                       (E) fish and wildlife habitat resources, in-
                                              Secretary shall make public a report, which               (B) the project for coastal storm resiliency,         cluding in the Mississippi Sound Estuary,
                                              may be based on the Water Management                    Chicago shoreline, Illinois.                            the Lake Pontchartrain Basin, the Breton
                                              Daily Operational Reports, disclosing the                 (3) ADDITIONAL CONSIDERATIONS.—Any fea-               Sound, the Barataria Basin, the Terrebonne
                                              volumes of water deliveries to or discharges            sibility study carried out pursuant to this             Basin,     the    Atchafalaya    Basin,   the
                                              from Lake Okeechobee & Vicinity, Water                  subsection, including pursuant to a rec-                Vermilion–Teche Basin, and other outlets of
                                              Conservation Area I, Water Conservation                 ommendation under paragraph (1)(D), shall               the Mississippi River and Tributaries
                                              Area II, Water Conservation Area III, East              be considered to be a continuation of the               project;
                                              Coast Canals, and the South Dade Convey-                comprehensive assessment described in sub-                (F) mitigation of adverse impacts from op-
                                              ance. Such report shall be aggregated and re-           section (a).                                            erations of flood control structures to the
                                              ported in a format designed for the general               (c) EXEMPTION FROM MAXIMUM STUDY COST                 Mississippi Sound Estuary, the Lake Pont-
                                                                                                      AND DURATION LIMITATIONS.—Section 1001 of               chartrain Basin, the Breton Sound, the
                                              public, using maps or other widely under-
                                              stood communication tools.                              the Water Resources Reform and Develop-                 Barataria Basin, the Atchafalaya Basin, and
                                                (c) EFFECT.—In carrying out the evaluation            ment Act of 2014 (33 U.S.C. 2282c) shall not            other outlets of the Mississippi River and
                                                                                                      apply to any study recommended under sub-               Tributaries project;
                                              under subsection (a)(1), nothing shall be con-
                                                                                                      section (b)(1)(D) or carried out pursuant to              (G) the effects of dredging and river-bot-
                                              strued to authorize any new purpose for the
                                                                                                      subsection (b)(2).                                      tom elevation changes on drainage effi-
                                              management of Lake Okeechobee or author-
                                                                                                      SEC. 212. REPORT ON THE STATUS OF RESTORA-              ciency;
                                              ize the Secretary to affect any existing au-                        TION IN THE LOUISIANA COASTAL
                                              thorized purpose, including flood protection                        AREA.
                                                                                                                                                                (H) the economic impacts of existing prac-
                                              and management of Lake Okeechobee to pro-                 Not later than 1 year after the date of en-           tices, including such impacts on coastal re-
                                              vide water supply for all authorized users.             actment of this Act, the Coastal Louisiana              sources;
                                              SEC. 211. GREAT LAKES COASTAL RESILIENCY                Ecosystem Protection and Restoration Task                 (I) monitoring requirements, including as
                                                         STUDY.                                       Force established by section 7004 of Water              near-real time monitoring as practicable,
                                                (a) IN GENERAL.—In carrying out the com-              Resources Development Act of 2007 (121 Stat.            and adaptive management measures to re-
                                              prehensive assessment of water resources                1272) shall submit to Congress a report that            spond to changing conditions over time;
                                              needs for the Great Lakes System under sec-             summarizes the activities and recommenda-                 (J) the division of responsibilities among
                                              tion 729 of the Water Resources Development             tions of the Task Force, including—                     the Federal Government and non-Federal in-
                                              Act of 1986 (33 U.S.C. 2267a), as required by             (1) policies, strategies, plans, programs,            terests with respect to the purposes de-
                                              section 1219 of the Water Resources Develop-            projects, and activities undertaken for ad-             scribed in paragraph (1); and
                                              ment Act of 2018 (132 Stat. 3811), the Sec-             dressing conservation, protection, restora-               (K) other matters, as determined by the
                                              retary shall—                                           tion, and maintenance of the coastal Lou-               Secretary.
                                                (1) taking into account recent high lake              isiana ecosystem; and                                     (b) CONSULTATION AND USE OF EXISTING
                                              levels within the Great Lakes, assess and                 (2) financial participation by each agency            DATA.—In conducting the comprehensive
                                              make recommendations to Congress on—                    represented on the Task Force in conserving,            study under subsection (a), the Secretary
                                                (A) coastal storm and flood risk manage-              protecting, restoring, and maintaining the              shall consult with applicable Federal, State,
                                              ment measures, including measures that use              coastal Louisiana ecosystem.                            and local agencies, Indian Tribes, non-Fed-
                                              natural features and nature-based features,             SEC.    213.  LOWER MISSISSIPPI RIVER COM-              eral interests, and other stakeholders, and,
                                              as those terms are defined in section 1184 of                         PREHENSIVE MANAGEMENT STUDY.              to the maximum extent practicable and




SSpencer on DSK126QN23PROD with HOUSE
                                              the Water Resources Development Act of                       (a) COMPREHENSIVE STUDY.—                          where appropriate, make use of existing data
                                              2016 (33 U.S.C. 2289a);                                      (1) PURPOSE.—The Secretary, in collabora-          provided to the Secretary by such entities or
                                                (B) operation and maintenance of the                  tion with the heads of other relevant Federal           from any relevant multistate monitoring
                                              Great Lakes Navigation System, as such                  agencies    and  pursuant     to   subsection           programs.
                                              term is defined in section 210 of the Water             (d)(1)(A), shall conduct a comprehensive                  (c) RECOMMENDATIONS.—In conducting the
                                              Resources Development Act of 1986 (33 U.S.C.            study of the Lower Mississippi River basin,             comprehensive study under subsection (a),
                                              2238);                                                  from Cape Girardeau, Missouri, to the Gulf              the Secretary shall develop actionable rec-
                                                (C) ecosystem protection and restoration;             of Mexico, to identify recommendations of               ommendations to Congress, including for—




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000    Frm 00049   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6956                                             CONGRESSIONAL RECORD — HOUSE                                                         December 8, 2020
                                                (1) the construction of new water resources           carry out this section $25,000,000, to remain           sidered a continuation of the Lower Missouri
                                              development projects to improve the max-                available until expended.                               Basin study:
                                              imum effective river resource use and con-                (i) SAVINGS PROVISION.—Nothing in this                  (A) Any additional study carried out under
                                              trol;                                                   section shall delay or interfere with, or be            paragraph (2).
                                                (2) the structural or operational modifica-           construed as grounds for enjoining construc-              (B) Any study recommended to be carried
                                              tion of completed water resources develop-              tion of, authorized projects within the study           out in a report that the Chief of Engineers
                                              ment projects;                                          area.                                                   prepares for the Lower Missouri Basin study.
                                                (3) such additional monitoring of, or adapt-          SEC.    214.  UPPER MISSISSIPPI RIVER COM-                (C) Any study recommended to be carried
                                              ive management measures to carry out with                             PREHENSIVE PLAN.                          out in a report that the Chief of Engineers
                                              respect to, completed water resources devel-                 (a) ASSESSMENT.—The Secretary shall con-           prepares for an additional study carried out
                                              opment projects, to respond to changing con-            duct an assessment of the water resources               under paragraph (2).
                                              ditions;                                                needs of the Upper Mississippi River under                (D) Any study spun off from the Lower
                                                (4) improving the efficiency of operational           section 729 of the Water Resources Develop-             Missouri Basin study before the completion
                                              and maintenance dredging within the study               ment Act of 1986 (33 U.S.C. 2267a).                     of such study.
                                              area;                                                     (b) REQUIREMENTS.—The Secretary shall                   (E) Any study spun off from an additional
                                                (5) whether changes are necessary to the              carry out the assessment under subsection               study carried out under paragraph (2) before
                                              Mississippi River and Tributaries project               (a) in accordance with the requirements in              the completion of such additional study.
                                              within the study area;                                  section 1206(b) of Water Resources Develop-               (4) RELIANCE ON EXISTING INFORMATION.—In
                                                (6) other Federal and non-Federal action,             ment Act of 2016 (130 Stat. 1686).                      carrying out any study described in or au-
                                              where appropriate; and                                  SEC.     215. UPPER MISSOURI RIVER BASIN                thorized by this subsection, the Secretary, to
                                                (7) follow-up studies and data collection                           MAINSTEM DAM FISH LOSS RE-                the extent practicable, shall rely on existing
                                                                                                                    SEARCH.                                   data and analysis, including data and anal-
                                              and monitoring to be carried out by the rel-
                                              evant Federal or State agency.                               (a) IN GENERAL.—Pursuant to section 22 of          ysis prepared under section 22 of the Water
                                                                                                      the Water Resources Development Act of                  Resources Development Act of 1974 (42 U.S.C.
                                                (d) COMPLETION OF STUDY; REPORT TO CON-
                                                                                                      1974 (42 U.S.C. 1962d–16), the Secretary shall          1962d–16).
                                              GRESS.—
                                                                                                      conduct research on the management of fish                (5) CONSIDERATION; CONSULTATION.—In de-
                                                (1) ANNUAL REPORTS.—Not later than 1 year
                                                                                                      losses through the mainstem dams of the                 veloping recommendations under paragraph
                                              after the date of enactment of this Act, and
                                                                                                      Missouri River Basin during periods of high             (1), the Secretary shall—
                                              annually thereafter until the final report
                                                                                                      flow.                                                     (A) consider the use of—
                                              under paragraph (2) is submitted, the Sec-
                                                                                                        (b) CONTENTS.—The research conducted                    (i) structural and nonstructural measures,
                                              retary shall submit to the Committee on
                                                                                                      under subsection (a) shall include an exam-             including the setting back of levees and re-
                                              Transportation and Infrastructure of the
                                                                                                      ination of—                                             moving structures from areas of recurring
                                              House of Representatives and the Committee
                                                                                                        (1) the effects of high flow rates through            flood vulnerability, where advantageous, to
                                              on Environment and Public Works of the
                                                                                                      Upper Missouri River Basin mainstem dam                 reduce flood risk and damages in the Lower
                                              Senate a report detailing—
                                                                                                      outlet works on fish passage;                           Missouri River Basin; and
                                                (A) any interim actions relating to water
                                                                                                        (2) options used by other Corps of Engi-                (ii) where such features are locally accept-
                                              resources development projects within the
                                                                                                      neers district offices to mitigate fish losses          able, natural features or nature-based fea-
                                              study area undertaken by the Secretary
                                                                                                      through dams; and                                       tures (as such terms are defined in section
                                              under existing authority; and
                                                                                                        (3) the feasibility of implementing fish loss         1184 of the Water Resources Development
                                                (B) any recommendations developed under
                                                                                                      mitigation options in the Upper Missouri                Act of 2016 (33 U.S.C. 2289a); and
                                              subsection (c).
                                                                                                      River Basin mainstem dams, based on simi-                 (B) consult with applicable Federal and
                                                (2) FINAL REPORT.—Not later than 5 years                                                                      State agencies, Indian Tribes, and other
                                                                                                      lar ongoing studies.
                                              after the date of enactment of this section,              (c) REPORT.—Not later than 18 months                  stakeholders within the Lower Missouri
                                              the Secretary shall submit to the Committee             after the date of enactment of this Act, the            River Basin and solicit public comment on
                                              on Transportation and Infrastructure of the             Secretary shall submit to the Committee on              such recommendations.
                                              House of Representatives and the Committee              Transportation and Infrastructure of the                  (6) EXEMPTION FROM MAXIMUM STUDY COST
                                              on Environment and Public Works of the                  House of Representatives and the Committee              AND DURATION LIMITATIONS.—Section 1001 of
                                              Senate a final report detailing the results of          on Environment and Public Works of the                  the Water Resources Reform and Develop-
                                              the comprehensive study required by this                Senate a report recommending a plan to ad-              ment Act of 2014 (33 U.S.C. 2282c) shall not
                                              section, including the recommendations de-              dress fish losses through mainstem dams in              apply to the Lower Missouri Basin study or
                                              veloped under subsection (c).                           the Upper Missouri River Basin.                         any study described in paragraph (3).
                                                (3) APPLICATION OF CERTAIN REQUIRE-                   SEC. 216. LOWER AND UPPER MISSOURI RIVER                  (7) PRECONSTRUCTION, ENGINEERING, AND DE-
                                              MENTS.—Section 1001(a) of the Water Re-                             COMPREHENSIVE FLOOD PROTEC-                 SIGN.—Upon completion of a study author-
                                              sources Reform and Development Act of 2014                          TION.                                       ized by this subsection, if the Secretary de-
                                              (33 U.S.C. 2282c(a)) shall not apply to the               (a) ADDITIONAL STUDIES FOR LOWER MIS-                 termines that a recommended project, or
                                              study carried out by the Secretary under                SOURI RIVER BASIN.—                                     modification to a project described in para-
                                              this section.                                             (1) IN GENERAL.—Except as provided in                 graph (1), is justified, the Secretary may pro-
                                                (e) FURTHER ANALYSIS.—                                paragraph (2), upon the request of the non-             ceed directly to preconstruction planning,
                                                (1) IN GENERAL.—In conducting the com-                Federal interest for the Lower Missouri                 engineering, and design of the project or
                                              prehensive study under subsection (a), the              Basin study, the Secretary shall expand the             modification.
                                              Secretary shall carry out activities in geo-            scope of such study to investigate and pro-               (8) TECHNICAL ASSISTANCE.—
                                              graphic areas that warrant additional anal-             vide recommendations relating to—                         (A) IN GENERAL.—For the provision of tech-
                                              ysis by the Corps of Engineers, including fea-            (A) modifications to projects in Iowa, Kan-           nical assistance to support small commu-
                                              sibility studies.                                       sas, Nebraska, and Missouri authorized                  nities and economically disadvantaged com-
                                                (2) TREATMENT.—A feasibility study carried            under the Pick-Sloan Missouri River Basin               munities in the planning and design of flood
                                              out under paragraph (1) shall be considered             Program (authorized by section 9(b) of the              risk management and flood risk resiliency
                                              to be a continuation of the comprehensive               Act of December 22, 1944 (chapter 665, 58 Stat.         projects in the Lower Missouri River Basin,
                                              study conducted under subsection (a).                   891)) and the Missouri River Bank Stabiliza-            for each of fiscal years 2021 through 2026,
                                                (f) REQUIREMENTS.—The comprehensive                   tion and Navigation project (authorized by              there are authorized to be appropriated—
                                              study conducted under subsection (a) shall              section 2 of the Act of March 2, 1945 (chapter            (i) $2,000,000 to carry out section 206 of the
                                              be carried out in accordance with the au-               19, 59 Stat. 19)), including modifications to           Flood Control Act of 1960 (33 U.S.C. 709a), in
                                              thorities for the Mississippi River and Tribu-          the authorized purposes of such projects to             addition to amounts otherwise authorized to
                                              taries project.                                         further flood risk management and resil-                carry out such section; and
                                                (g) DEFINITIONS.—In this section:                     iency; and                                                (ii) $2,000,000 to carry out section 22(a)(2) of
                                                (1) MISSISSIPPI RIVER AND TRIBUTARIES                   (B) modifications to non-Federal, publicly            the Water Resources Development Act of
                                              PROJECT.—The term ‘‘Mississippi River and               owned levees in the Lower Missouri River                1974 (42 U.S.C. 1962d–16), in addition to
                                              Tributaries project’’ means the Mississippi             Basin.                                                  amounts otherwise authorized to carry out
                                              River and Tributaries project authorized by               (2) EXCEPTION.—If the Secretary deter-                such section.
                                              the first section of the Act of May 15, 1928 (33        mines that expanding the scope of the Lower               (B) CONDITIONS.—
                                              U.S.C. 702a).                                           Missouri Basin study as provided in para-                 (i) LIMITATIONS NOT APPLICABLE.—The limi-




SSpencer on DSK126QN23PROD with HOUSE
                                                (2) NATURAL FEATURE; NATURE-BASED FEA-                graph (1) is not practicable, and the non-Fed-          tations on the use of funds in section 206(d)
                                              TURE.—The terms ‘‘natural feature’’ and ‘‘na-           eral interest for such study concurs in such            of the Flood Control Act of 1960 and section
                                              ture-based feature’’ have the meanings given            determination, the Secretary shall carry out            22(c)(2) of the Water Resources Development
                                              those terms in section 1184 of the Water Re-            such additional studies as are necessary to             Act of 1974 shall not apply to the amounts
                                              sources Development Act of 2016 (33 U.S.C.              investigate the modifications described in              authorized to be appropriated by subpara-
                                              2289a).                                                 paragraph (1).                                          graph (A).
                                                (h) AUTHORIZATION OF APPROPRIATIONS.—                   (3) CONTINUATION OF LOWER MISSOURI BASIN                (ii) RULE OF CONSTRUCTION.—Nothing in
                                              There is authorized to be appropriated to               STUDY.—The following studies shall be con-              this paragraph restricts the authority of the




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000    Frm 00050   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6957
                                              Secretary to use any funds otherwise appro-             cies to reduce flood risk and improve resil-           tion 2 of the Act of March 2, 1945 (chapter 19,
                                              priated to carry out section 206 of the Flood           iency;                                                 59 Stat. 19)); or
                                              Control Act of 1960 or section 22(a)(2) of the            (F) any necessary changes to the general               (C) a non-Federal, publicly owned levee
                                              Water Resources Development Act of 1974 to              comprehensive plan for flood control and               system located within the Upper Missouri
                                              provide technical assistance described in               other purposes in the Missouri River Basin             River Basin.
                                              subparagraph (A).                                       under section 4 of the Act of June 28, 1938              (c) COORDINATION.—Upon completion of the
                                                (9) COMPLETION OF STUDY; REPORT TO CON-               (chapter 795, 52 Stat. 1218; 58 Stat. 891); and        studies under subsections (a) and (b), the
                                              GRESS.—Not later than 3 years after the date              (G) follow-up studies for problem areas for          Secretary shall develop a strategy that, to
                                              of enactment of this Act, the Secretary shall           which data or current technology does not              the maximum extent practicable, coordi-
                                              submit to the Committee on Transportation               allow immediate solutions.                             nates and aligns the results of such studies.
                                              and Infrastructure of the House of Rep-                   (3) COMPLETION OF STUDY; REPORT TO CON-              SEC.    217. PORTSMOUTH   HARBOR   AND
                                              resentatives and the Committee on Environ-                                                                               PISCATAQUA RIVER AND RYE HAR-
                                                                                                      GRESS.—Not later than 3 years after the date
                                                                                                                                                                       BOR, NEW HAMPSHIRE.
                                              ment and Public Works of the Senate a re-               of enactment of this subsection, the Sec-
                                              port detailing—                                                                                                  (a) REQUIREMENT TO EXPEDITE.—The Sec-
                                                                                                      retary shall submit to the Committee on
                                                (A) the results of the study authorized by                                                                   retary shall expedite authorized activities to
                                                                                                      Transportation and Infrastructure of the
                                              this subsection;                                                                                               address the impacts of shoaling affecting the
                                                                                                      House of Representatives and the Committee             project for navigation, Rye Harbor, New
                                                (B) any additional, site-specific areas with-         on Environment and Public Works of the
                                              in the Lower Missouri River Basin for which                                                                    Hampshire, authorized by section 101 of the
                                                                                                      Senate a report that—                                  River and Harbor Act of 1960 (74 Stat. 480).
                                              additional study for flood risk management                (A) contains the results of the comprehen-             (b) STATUS UPDATE.—Not later than 180
                                              projects is recommended by the Secretary;               sive study required by this subsection, in-            days after the date of enactment of this Act,
                                              and                                                     cluding any recommendations developed                  the Secretary shall submit to Congress a
                                                (C) any interim actions relating to existing          under paragraph (2);                                   written status update regarding—
                                              water resources development projects in the               (B) addresses—                                         (1) the activities required to be expedited
                                              Lower Missouri River Basin undertaken by                  (i) the potential for the transfer of flood          under subsection (a); and
                                              the Secretary during the study period.                  risk between and within the Upper and                    (2) the project for navigation, Portsmouth
                                                (10) DEFINITIONS.—In this subsection:                 Lower Missouri River basins with respect to            Harbor and Piscataqua River, authorized by
                                                (A) LOWER MISSOURI BASIN STUDY.—The                   any changes recommended pursuant to para-              section 101 of the River and Harbor Act of
                                              term ‘‘Lower Missouri Basin study’’ means               graph (2)(F);                                          1962 (76 Stat. 1173), as required to be expe-
                                              the Lower Missouri Basin Flood Risk and                   (ii) adverse impacts to navigation and               dited under section 1317 of the Water Re-
                                              Resiliency Study, Iowa, Kansas, Nebraska,               other authorized purposes of the applicable            sources Development Act of 2018 (132 Stat.
                                              and Missouri, authorized pursuant to section            Missouri River project with respect to any             3823).
                                              216 of the Flood Control Act of 1970 (33 U.S.C.         changes recommended under paragraph                    SEC. 218. COUGAR AND DETROIT DAMS, WILLAM-
                                              549a).                                                  (2)(F); and                                                        ETTE RIVER BASIN, OREGON.
                                                (B) SMALL COMMUNITY.—The term ‘‘small                   (iii) whether there are opportunities for in-          (a) REPORT.—Not later than 2 years after
                                              community’’ means a local government that               creased non-Federal management in the                  the date of enactment of this Act, the Sec-
                                              serves a population of less than 15,000.                Upper Missouri River Basin;                            retary shall submit to the Committee on
                                                (b) UPPER MISSOURI RIVER BASIN COM-                     (C) recognizes—                                      Transportation and Infrastructure of the
                                              PREHENSIVE STUDY.—                                        (i) the interest and rights of States in—            House of Representatives and the Committee
                                                (1) IN GENERAL.—The Secretary, in collabo-              (I) determining the development of water-            on Environment and Public Works of the
                                              ration with the heads of other relevant Fed-            sheds within the borders of the State; and             Senate, and make publicly available, a re-
                                              eral agencies, shall conduct a comprehensive              (II) water utilization and control; and              port providing an initial analysis of
                                              study to address flood risk in areas affected             (ii) the primary responsibilities of States          deauthorizing hydropower as a project pur-
                                              by severe flooding in 2019 along the Upper              and local interests in developing water sup-           pose at the Cougar and Detroit Dams
                                              Missouri River, including an examination                plies for domestic, municipal, industrial, and         project.
                                              of—                                                     other purposes; and                                      (b) CONTENTS.—The Secretary shall include
                                                (A) the use of structural and nonstructural             (D) describes any interim actions relating           in the report submitted under subsection
                                              flood control and floodplain management                 to existing water resources development                (a)—
                                              strategies, including the consideration of              projects in the Upper Missouri River Basin               (1) a description of the potential effects of
                                              natural features or nature-based features (as           undertaken by the Secretary during the                 deauthorizing hydropower as a project pur-
                                              such terms are defined in section 1184 of the           study period.                                          pose at the Cougar and Detroit Dams project
                                              Water Resources Development Act of 2016 (33               (4) CONSULTATION.—In carrying out this               on—
                                              U.S.C. 2289a);                                          subsection, the Secretary shall consult with             (A) the operation of the project, including
                                                (B) continued operation and maintenance               applicable Federal and State agencies, In-             with respect to the other authorized pur-
                                              of the navigation project;                              dian Tribes, and other stakeholders within             poses of the project;
                                                (C) management of bank caving and ero-                the Upper Missouri River Basin and solicit               (B) compliance of the project with the En-
                                              sion;                                                   public comment.                                        dangered Species Act;
                                                (D) maintenance of water supply;                        (5) RELIANCE ON EXISTING INFORMATION.—In               (C) costs that would be attributed to other
                                                (E) fish and wildlife habitat management;             carrying out any study described in or au-             authorized purposes of the project, including
                                                (F) recreation needs;                                 thorized by this subsection, the Secretary, to         costs relating to compliance with such Act;
                                                (G) environmental restoration needs;                  the extent practicable, shall rely on existing         and
                                                (H) the division of responsibilities of the           data and analysis, including data and anal-              (D) other ongoing studies in the Willam-
                                              Federal Government and non-Federal inter-               ysis prepared under section 22 of the Water            ette River Basin; and
                                              ests with respect to Missouri River flooding;           Resources Development Act of 1974 (42 U.S.C.             (2) identification of any further research
                                                (I) the roles and responsibilities of Federal         1962d–16).                                             needed.
                                              agencies with respect to Missouri River                   (6) EXEMPTION FROM MAXIMUM STUDY COST                  (c) PROJECT DEFINED.—In this section, the
                                              flooding; and                                           AND DURATION LIMITATIONS.—Section 1001 of              terms ‘‘Cougar and Detroit Dams project’’
                                                (J) any other related matters, as deter-              the Water Resources Reform and Develop-                and ‘‘project’’ mean the Cougar Dam and
                                              mined by the Secretary.                                 ment Act of 2014 (33 U.S.C. 2282c) shall not           Reservoir project and Detroit Dam and Res-
                                                (2) RECOMMENDATIONS.—In conducting the                apply to the comprehensive study carried               ervoir project, Willamette River Basin, Or-
                                              study under this subsection, the Secretary              out under this section or any feasibility              egon, authorized by section 204 of the Flood
                                              may develop recommendations to Congress                 study described in paragraph (7).                      Control Act of 1950 (64 Stat. 179), and facili-
                                              for—                                                      (7) ADDITIONAL CONSIDERATIONS.—Any fea-              ties that operate in conjunction with the
                                                (A) the construction of a water resources             sibility study carried out pursuant to a rec-          main Detroit Dam facility, including the Big
                                              development project;                                    ommendation included in the report sub-                Cliff re-regulating dam.
                                                (B) the structural or operational modifica-           mitted under this subsection shall be consid-          SEC. 219. PORT ORFORD, OREGON.
                                              tion of an existing water resources develop-            ered to be a continuation of the comprehen-              Not later than 180 days after the date of
                                              ment project;                                           sive study required under paragraph (1).               enactment of this Act, the Secretary shall,
                                                (C) such additional monitoring of, or                   (8) DEFINITION.—In this subsection, the              at Federal expense, submit to the Committee
                                              adaptive management measures to carry out               term ‘‘Missouri River project’’ means a                on Transportation and Infrastructure of the




SSpencer on DSK126QN23PROD with HOUSE
                                              with respect to, existing water resources de-           project constructed as part of—                        House of Representatives and the Committee
                                              velopment projects, to respond to changing                (A) the Pick-Sloan Missouri River Basin              on Environment and Public Works of the
                                              conditions;                                             Program (authorized by section 9(b) of the             Senate a summary report on the research
                                                (D) geographic areas within the Upper Mis-            Act of December 22, 1944 (chapter 665, 58 Stat.        completed and data gathered by the date of
                                              souri River basin for additional study by the           891)), located in the States of Wyoming, Mon-          enactment of this Act with regards to the
                                              Secretary;                                              tana, North Dakota, or South Dakota;                   configuration of a breakwater for the project
                                                (E) management plans and actions to be                  (B) the Missouri River Bank Stabilization            for navigation, Port Orford, Oregon, author-
                                              carried out by the responsible Federal agen-            and Navigation project (authorized by sec-             ized by section 117 of the River and Harbor




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00051   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6958                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for          (i) that has been authorized by Congress to            (c)   SUBMISSION   TO   CONGRESS;   PUBLICA-
                                              the purposes of addressing shoaling issues to           be carried out by the Secretary and does not           TION.—
                                              minimize long-term maintenance costs.                   require any additional congressional author-              (1) SUBMISSION TO CONGRESS.—The Sec-
                                              SEC. 220. WILSON CREEK AND SLOAN CREEK,                 ization to be carried out;                             retary may submit a report under this sec-
                                                         FAIRVIEW, TEXAS.                               (ii) that the Secretary has the capability           tion in conjunction with the submission of
                                                Not later than 180 days after the date of             to carry out if funds are appropriated for             the annual report under section 7001 of the
                                              enactment of this section, the Secretary                such study or project under any of the ‘‘In-           Water Resources Reform and Development
                                              shall submit to Congress a written status up-           vestigations’’, ‘‘Construction’’, ‘‘Operation          Act of 2014 (33 U.S.C. 2282d).
                                              date regarding efforts to address flooding              and Maintenance’’, or ‘‘Mississippi River and             (2) PUBLICATION.—On submission of each
                                              along Wilson Creek and Sloan Creek in the               Tributaries’’ appropriations accounts for the          report under this section, the Secretary shall
                                              City of Fairview, Texas.                                Corps of Engineers; and                                make the report publicly available, includ-
                                              SEC. 221. STUDY ON WATER SUPPLY AND WATER                 (iii) for which a non-Federal interest—              ing through publication on the internet.
                                                          CONSERVATION   AT  WATER   RE-                (I) in the case of a study or a project other           (d) DEFINITIONS.—In this section:
                                                          SOURCES DEVELOPMENT PROJECTS.               than a project for which funds may be appro-              (1) NON-FEDERAL INTEREST.—The term
                                                (a) IN GENERAL.—Not later than 18 months              priated for operation and maintenance, has             ‘‘non-Federal interest’’ has the meaning
                                              after the date of enactment of this Act, the            entered into a feasibility cost-sharing agree-         given that term in section 221 of the Flood
                                              Secretary shall submit to the Committee on              ment, design agreement, or project partner-            Control Act of 1970 (42 U.S.C. 1962d–5b).
                                              Transportation and Infrastructure of the                ship agreement with the Corps of Engineers,               (2)   WATER     RESOURCES     DEVELOPMENT
                                              House of the Representatives and the Com-               or has informed the Secretary that the non-            PROJECT.—The term ‘‘water resources devel-
                                              mittee on Environment and Public Works of               Federal interest has the financial capability          opment project’’ includes a separable ele-
                                              the Senate a report that analyzes the bene-             to enter into such an agreement within 1
                                              fits and consequences of including water sup-                                                                  ment of a project, a project under an envi-
                                                                                                      year; and                                              ronmental infrastructure assistance pro-
                                              ply and water conservation as a primary                   (II) demonstrates the legal and financial
                                              mission of the Corps of Engineers in carrying                                                                  gram, and a project the authorized purposes
                                                                                                      capability to satisfy the requirements for             of which include water supply.
                                              out water resources development projects.               local cooperation with respect to the study
                                                (b) INCLUSION.—The Secretary shall include            or project.                                            SEC. 223. COMPLETION OF REPORTS AND MATE-
                                              in the report submitted under subsection                                                                                   RIALS.
                                                                                                        (B) DESCRIPTION OF BENEFITS.—
                                              (a)—                                                      (i) DESCRIPTION.—The Secretary shall, to               (a) IN GENERAL.—Using available appro-
                                                (1) a description of existing water re-               the maximum extent practicable, describe in            priations, not later than 180 days after the
                                              sources development projects with water                 each report submitted under this section the           date of enactment of this section, the Sec-
                                              supply or water conservation as authorized              benefits, as described in clause (ii), of each         retary shall complete and submit to Con-
                                              purposes, and the extent to which such                  feasibility study and water resources devel-           gress the following materials:
                                              projects are utilized for such purposes;                opment project included in the report.                   (1) The report required by section 1211 of
                                                (2) a description of existing water re-                 (ii) BENEFITS.—The benefits referred to in           the Water Resources Development Act of
                                              sources development projects with respect to            clause (i) are benefits to—                            2018 (132 Stat. 3808).
                                              which—                                                    (I) the protection of human life and prop-             (2) Implementation guidance for the
                                                (A) water supply or water conservation                erty;                                                  amendments made by section 1176 of the
                                              could be added as a project purpose, includ-              (II) improvement to transportation;                  Water Resources Development Act of 2016
                                              ing those with respect to which a non-Fed-                (III) the national, regional, or local econ-         (130 Stat. 1673).
                                              eral interest has expressed an interest in              omy;                                                     (3) Implementation guidance for the
                                              adding water supply or water conservation                 (IV) the environment; or                             amendments made by section 3029(a) of the
                                              as a project purpose; and                                 (V) the national security interests of the           Water Resources Reform and Development
                                                (B) such a purpose could be accommodated              United States.                                         Act of 2014 (128 Stat. 1305).
                                              while maintaining existing authorized pur-                (2) TRANSPARENCY.—The Secretary shall                  (4) Any other report or other material re-
                                              poses;                                                  include in each report submitted under this            quired to be submitted to Congress by any of
                                                (3) a description of ongoing water resources          section, for each feasibility study and water          the following Acts (including by amend-
                                              development project studies the authoriza-              resources development project included in              ments made by such Acts) that has not been
                                              tions for which include authorization for the           the report—                                            so submitted by the date of enactment of
                                              Secretary to study the feasibility of carrying            (A) the name of the associated non-Federal           this section:
                                              out the project with a purpose of water sup-            interest, including the name of any non-Fed-             (A) The Water Resources Reform and De-
                                              ply or water conservation;                              eral interest that has contributed, or is ex-          velopment Act of 2014 (Public Law 113–121).
                                                (4) an analysis of how adding water supply            pected to contribute, a non-Federal share of             (B) The Water Resources Development Act
                                              and water conservation as a primary mission             the cost of the study or project;                      of 2016 (Public Law 114–322).
                                              of the Corps of Engineers would affect the                (B) the purpose of the study or project;               (C) The Water Resources Development Act
                                              ability of the Secretary to carry out future              (C) an estimate, to the extent practicable,          of 2018 (Public Law 115–270).
                                              water resources development projects; and               of the Federal, non-Federal, and total costs             (b) USE OF EXISTING DATA.—To the extent
                                                (5) any recommendations of the Secretary              of the study or project, including, to the ex-         practicable and appropriate, the Secretary
                                              relating to including water supply and water            tent practicable, the fully funded capability          shall use existing data in completing any
                                              conservation as a primary mission of the                of the Corps of Engineers for—                         materials described in subsection (a).
                                              Corps of Engineers.                                       (i) the 3 fiscal years following the fiscal
                                                                                                                                                               (c) FAILURE TO SUBMIT.—If the Secretary
                                              SEC. 222. REPORT TO CONGRESS ON AUTHOR-                 year in which the report is submitted, in the
                                                                                                                                                             fails to submit materials as required by this
                                                         IZED STUDIES AND PROJECTS.                   case of a feasibility study; and
                                                                                                                                                             section, the Secretary shall immediately in-
                                                (a) IN GENERAL.—Not later than February 1               (ii) the 5 fiscal years following the fiscal
                                                                                                                                                             form the Committee on Environment and
                                              of each year, the Secretary shall develop and           year in which the report is submitted, in the
                                                                                                                                                             Public Works of the Senate and the Com-
                                              submit to Congress an annual report, to be              case of a water resources development
                                                                                                                                                             mittee on Transportation and Infrastructure
                                              entitled ‘‘Report to Congress on Authorized             project; and
                                                                                                                                                             of the House of Representatives, in writing,
                                              Water Resources Development Projects and                  (D) an estimate, to the extent practicable,
                                                                                                                                                             of the specific reasons for such failure and a
                                              Studies’’, that identifies—                             of the monetary and nonmonetary benefits
                                                                                                                                                             timeline for submission of the delinquent
                                                (1) ongoing or new feasibility studies, au-           of the study or project.
                                                                                                                                                             materials.
                                              thorized within the previous 20 years, for                (3) CERTIFICATION.—The Secretary shall in-
                                                                                                      clude in each report submitted under this                (d) IMPLEMENTATION GUIDANCE.—The Sec-
                                              which a Report of the Chief of Engineers has
                                                                                                      section a certification stating that each fea-         retary shall expeditiously issue any guidance
                                              not been issued;
                                                                                                      sibility study or water resources develop-             necessary to implement any provision of this
                                                (2) authorized feasibility studies for
                                                                                                      ment project included in the report meets              Act, including any amendments made by this
                                              projects in the preconstruction, engineering
                                                                                                      the criteria described in paragraph (1)(A).            Act, in accordance with section 1105 of the
                                              and design phase;
                                                                                                        (4) OMISSIONS.—                                      Water Resources Development Act of 2018 (33
                                                (3) ongoing or new water resources develop-
                                                                                                        (A) LIMITATION.—The Secretary shall not              U.S.C. 2202).
                                              ment projects authorized for construction
                                              within the previous 20 years; and                       omit from a report submitted under this sec-           SEC. 224. EMERGENCY FLOODING PROTECTION
                                                (4) authorized and constructed water re-              tion a study or project that otherwise meets                      FOR LAKES.
                                              sources development projects the Secretary              the criteria for inclusion in the report solely          The Secretary shall submit to Congress a




SSpencer on DSK126QN23PROD with HOUSE
                                              has the responsibility to operate or main-              on the basis of a policy of the Secretary.             report on the extent to which section 5 of the
                                              tain.                                                     (B) APPENDIX.—If the Secretary omits from            Act of August 18, 1941 (33 U.S.C. 701n), applies
                                                (b) CONTENTS.—                                        a report submitted under this section a                to lakes, including lakes with the flow of a
                                                (1) INCLUSIONS.—                                      study or project that otherwise meets the              slow-moving river, including, if applicable,
                                                (A) CRITERIA.—The Secretary shall include             criteria for inclusion in the report, the Sec-         recommendations for legislative changes to
                                              in each report submitted under this section             retary shall include with the report an ap-            ensure that such lakes are eligible for the
                                              only a feasibility study or water resources             pendix that lists the name of the study or             program carried out pursuant to such sec-
                                              development project—                                    project and reason for its omission.                   tion.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00052   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013    H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6959
                                              SEC. 225. REPORT ON DEBRIS REMOVAL.                     tional Academy of Sciences or a similar                submit to the Committee on Environment
                                                Section 1210 of the Water Resources Devel-            independent scientific and technical advi-             and Public Works of the Senate and the
                                              opment Act of 2018 (132 Stat. 3808) is amend-           sory organization to establish a panel of ex-          Committee on Transportation and Infra-
                                              ed to read as follows:                                  perts to conduct a peer review of the report           structure of the House of Representatives a
                                              ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.                  to be submitted under subsection (a).                  report on the extent to which flood insur-
                                                 ‘‘(a) IN GENERAL.—Not later than 180 days              (c) AUTHORIZATION OF APPROPRIATIONS.—                ance premium reductions that result from
                                              after the date of enactment of the Water Re-            There are authorized to be appropriated to             implementation of a flood risk management
                                              sources Development Act of 2020, the Sec-               the Secretary—                                         project, including structural elements, non-
                                              retary shall submit to Congress and make                  (1) $5,000,000 to carry out subsection (a);          structural elements, or natural features or
                                              publicly available a report that describes—             and                                                    nature-based features, are included in the
                                                ‘‘(1) the extent to which, during the 10 fis-           (2) $5,000,000 to carry out subsection (b).          calculation of the benefits of the project by
                                              cal years prior to such date of enactment,              SEC.   227.   SUBSURFACE DRAIN SYSTEMS           RE-   the Corps of Engineers.
                                              the Secretary has carried out section 3 of the                         SEARCH AND DEVELOPMENT.                    TITLE III—DEAUTHORIZATIONS AND
                                              Act of March 2, 1945 (33 U.S.C. 603a);                    Subject to the availability of appropria-                          MODIFICATIONS
                                                ‘‘(2) how the Secretary has evaluated po-             tions, the Secretary, acting through the Di-           SEC.   301.   DEAUTHORIZATION   OF   INACTIVE
                                              tential work to be carried out under that               rector of the Engineer Research and Develop-                         PROJECTS.
                                              section; and                                            ment Center and, where appropriate, in con-              (a) PURPOSES.—The purposes of this section
                                                ‘‘(3) the extent to which the Secretary               sultation with other Federal agencies, shall           are—
                                              plans to start, continue, or complete debris            carry out research and development activi-               (1) to identify water resources development
                                              removal activities in the 3 years following             ties relating to the use of subsurface drain           projects authorized by Congress that are no
                                              submission of the report.                               systems as—                                            longer viable for construction due to—
                                                ‘‘(b) FOCUS AREAS.—The Secretary shall in-                                                                     (A) a lack of local support;
                                                                                                        (1) a flood risk-reduction measure; or
                                              clude in the report submitted under sub-                                                                         (B) a lack of available Federal or non-Fed-
                                                                                                        (2) a coastal storm risk-reduction measure.
                                              section (a)—                                                                                                   eral resources; or
                                                                                                      SEC. 228. REPORT ON CORROSION PREVENTION
                                                ‘‘(1) identification of the debris removal                                                                     (C) an authorizing purpose that is no
                                                                                                                  ACTIVITIES.
                                              activities to be started, continued, or com-                                                                   longer relevant or feasible;
                                              pleted during the first fiscal year following             Not later than 180 days after the date of
                                                                                                      enactment of this Act, the Secretary shall               (2) to create an expedited and definitive
                                              the date of enactment of this subsection                                                                       process for Congress to deauthorize water re-
                                              within the boundaries of the North Atlantic             submit to the Committee on Transportation
                                                                                                      and Infrastructure of the House of Rep-                sources development projects that are no
                                              Division of the Corps of Engineers;                                                                            longer viable for construction; and
                                                ‘‘(2) the estimated total costs and comple-           resentatives and the Committee on Environ-
                                                                                                      ment and Public Works of the Senate, and                 (3) to allow the continued authorization of
                                              tion dates for such activities; and                                                                            water resources development projects that
                                                ‘‘(3) identification of the non-Federal in-           make publicly available, a report that de-
                                                                                                      scribes—                                               are viable for construction.
                                              terest associated with such activities.’’.                                                                       (b) PROPOSED DEAUTHORIZATION LIST.—
                                              SEC. 226. REPORT ON ANTECEDENT HYDROLOGIC                 (1) the extent to which the Secretary has
                                                                                                                                                               (1) PRELIMINARY LIST OF PROJECTS.—
                                                          CONDITIONS.                                 carried out section 1033 of the Water Re-
                                                                                                                                                               (A) IN GENERAL.—The Secretary shall de-
                                                (a) REPORT.—                                          sources Reform and Development Act of 2014
                                                                                                                                                             velop a preliminary list of each water re-
                                                (1) IN GENERAL.—Not later than 18 months              (33 U.S.C. 2350);                                      sources development project, or separable
                                              after the date of enactment of this Act, the              (2) the extent to which the Secretary has            element of a project, authorized for con-
                                              Secretary shall submit to the Committee on              incorporated corrosion prevention activities           struction before November 8, 2007, for
                                              Environment and Public Works of the Senate              (as defined in such section) at water re-              which—
                                              and the Committee on Transportation and                 sources development projects constructed or              (i) planning, design, or construction was
                                              Infrastructure of the House of Representa-              maintained by the Secretary since the date             not initiated before the date of enactment of
                                              tives a report on the use by the Corps of En-           of enactment of such section; and                      this Act; or
                                              gineers since 2010 of data relating to ante-              (3) in instances where the Secretary has               (ii) planning, design, or construction was
                                              cedent hydrologic conditions in the Missouri            not incorporated corrosion prevention ac-              initiated before the date of enactment of this
                                              River Basin (including soil moisture condi-             tivities at such water resources development           Act, but for which no funds, Federal or non-
                                              tions,     frost   depths,    snowpack,     and         projects since such date, an explanation as            Federal, were obligated for planning, design,
                                              streamflow conditions) in—                              to why such corrosion prevention activities            or construction of the project or separable
                                                (A) conducting Missouri River mainstem                have not been incorporated.                            element of the project during the current fis-
                                              reservoir operations under the Missouri                 SEC. 229. ANNUAL REPORTING ON DISSEMINA-               cal year or any of the 10 preceding fiscal
                                              River Master Manual;                                               TION OF INFORMATION.                        years.
                                                (B) developing related annual operating                 Section 1104(b) of the Water Resources De-             (B) USE OF COMPREHENSIVE CONSTRUCTION
                                              plans; and                                              velopment Act of 2018 (33 U.S.C. 2282d note)           BACKLOG AND OPERATION AND MAINTENANCE
                                                (C) performing seasonal, monthly, and                 is amended—                                            REPORT.—The Secretary may develop the
                                              daily operations.                                         (1) by redesignating paragraphs (1) through          preliminary list from the comprehensive
                                                (2) INCLUSIONS.—The report submitted                  (4) as subparagraphs (A) through (D), respec-          construction backlog and operation and
                                              under paragraph (1) shall include—                      tively, and indenting appropriately;                   maintenance reports developed pursuant to
                                                (A) a review of—                                        (2) in the matter preceding subparagraph             section 1001(b)(2) of the Water Resources De-
                                                (i) the approach of the Corps of Engineers            (A) (as so redesignated), by striking ‘‘The            velopment Act of 1986 (33 U.S.C. 579a).
                                              to forecasting basin runoff in developing an-           Secretary’’ and inserting the following:                 (C) EXCLUSIONS.—The Secretary shall not
                                              nual operating plans of the Corps of Engi-                ‘‘(1) IN GENERAL.—The Secretary’’; and               include on the preliminary list—
                                              neers;                                                    (3) by adding at the end the following:                (i) an environmental infrastructure assist-
                                                (ii) the assessment of existing and alter-              ‘‘(2) ANNUAL REPORTING.—Not less fre-                ance project authorized to be carried out by
                                              native algorithms that could improve basin              quently than annually, the Secretary shall             the Secretary (including a project authorized
                                              runoff forecasting;                                     provide to the Committee on Environment                pursuant to an environmental assistance
                                                (iii) the approach of the Corps of Engineers          and Public Works of the Senate and the                 program); or
                                              for reservoir releases in the winter, spring,           Committee on Transportation and Infra-                   (ii) a project or separable element of a
                                              summer, and fall, based on basin runoff fore-           structure of the House of Representatives a            project authorized as part of the Comprehen-
                                              casts;                                                  written update on the progress of the imple-           sive Everglades Restoration Plan described
                                                (iv) the technical report of the Corps of En-         mentation of paragraph (1), including a de-            in section 601 of the Water Resources Devel-
                                              gineers entitled ‘‘Long-Term Runoff Fore-               scription of each education and outreach ac-           opment Act of 2000 (114 Stat. 2680).
                                              casting’’, dated February, 2017;                        tion the Secretary is taking to implement                (2) PREPARATION OF PROPOSED DEAUTHOR-
                                                (v) the use by the Corps of Engineers of              that paragraph.                                        IZATION LIST.—
                                              data from Federal and State entities in basin             ‘‘(3) GUIDANCE; COMPLIANCE.—The Sec-                   (A) DEAUTHORIZATION AMOUNT.—The Sec-
                                              runoff forecasts; and                                   retary shall—                                          retary shall prepare a proposed list of
                                                (vi) the use by the Corps of Engineers of               ‘‘(A) issue guidance on the uniform imple-           projects for deauthorization comprised of a
                                              advanced data collection, including through             mentation by each district of the Corps of             subset of projects and separable elements
                                              the use of unmanned aerial systems, fore-               Engineers of the process for submitting pro-           identified on the preliminary list developed
                                              casting, and modeling;                                  posals under section 7001 of the Water Re-             under paragraph (1) that have, in the aggre-




SSpencer on DSK126QN23PROD with HOUSE
                                                (B) findings and recommendations on how               sources Reform and Development Act of 2014             gate, an estimated Federal cost to complete
                                              to best incorporate antecedent basin condi-             (33 U.S.C. 2282d); and                                 that is at least $10,000,000,000.
                                              tions in annual operating plans and Missouri              ‘‘(B) each year, ensure compliance with the            (B) DETERMINATION OF FEDERAL COST TO
                                              River mainstem reservoir operations; and                guidance issued under subparagraph (A).’’.             COMPLETE.—For purposes of subparagraph
                                                (C) the results of the peer review conducted          SEC. 230. REPORT ON BENEFITS CALCULATION               (A), the Federal cost to complete shall take
                                              under subsection (b).                                               FOR FLOOD CONTROL STRUCTURES.              into account any allowances authorized by
                                                (b) PEER REVIEW.—The Secretary shall                    Not later than 180 days after the date of            section 902 of the Water Resources Develop-
                                              seek to enter into an agreement with the Na-            enactment of this Act, the Secretary shall             ment Act of 1986 (33 U.S.C. 2280), as applied




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00053   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6960                                             CONGRESSIONAL RECORD — HOUSE                                                        December 8, 2020
                                              to the most recent project schedule and cost              (1) IN GENERAL.—After the expiration of the          Committee on Environment and Public
                                              estimate.                                               2-year period beginning on the date of publi-          Works of the Senate a post-authorization
                                                 (C) INCLUSION OF DEAUTHORIZATION OF ANTI-            cation of the final deauthorization list and           change report that updates the economic and
                                              QUATED PROJECTS.—The Secretary shall re-                appendix under subsection (c)(1)(B), a project         environmental analysis of the project or sep-
                                              duce the amount identified for deauthoriza-             or separable element of a project identified           arable element; and
                                              tion under paragraph (2)(A) by an amount                in the final deauthorization list is hereby de-           (2) the Committee on Transportation and
                                              equivalent to the estimated current value of            authorized, unless Congress passes a joint             Infrastructure of the House of Representa-
                                              each project, or separable element of a                 resolution disapproving the final deauthor-            tives and the Committee on Environment
                                              project, that is deauthorized by subsection             ization list prior to the end of such period.          and Public Works of the Senate take appro-
                                              (f).                                                      (2) NON-FEDERAL CONTRIBUTIONS.—                      priate action to address any modifications to
                                                 (3) SEQUENCING OF PROJECTS.—                           (A) IN GENERAL.—A project or separable               the economic and environmental analysis for
                                                 (A) IN GENERAL.—The Secretary shall iden-            element of a project identified in the final           the project or separable element of the
                                              tify projects and separable elements for in-            deauthorization list under subsection (c)              project contained in the post-authorization
                                              clusion on the proposed list of projects for            shall not be deauthorized under this sub-              change report.
                                              deauthorization under paragraph (2) accord-             section if, before the expiration of the 2-year           (h) DEFINITIONS.—In this section:
                                              ing to the order in which the projects and              period referred to in paragraph (1), the non-             (1) POST-AUTHORIZATION CHANGE REPORT.—
                                              separable elements were authorized, begin-              Federal interest for the project or separable          The term ‘‘post-authorization change re-
                                              ning with the earliest authorized projects              element of the project provides sufficient             port’’ has the meaning given such term in
                                              and separable elements and ending with the              funds to complete the project or separable             section 1132(d) of the Water Resources Devel-
                                              latest project or separable element necessary           element of the project.                                opment Act of 2016 (33 U.S.C. 2282e).
                                              to meet the aggregate amount under para-                  (B) TREATMENT OF PROJECTS.—Notwith-                     (2) POST-AUTHORIZATION STUDY.—The term
                                              graph (2)(A).                                           standing subparagraph (A), each project and            ‘‘post-authorization study’’ means—
                                                 (B) FACTORS TO CONSIDER.—The Secretary               separable element of a project identified in              (A) a feasibility report developed under
                                              may identify projects and separable ele-                the final deauthorization list shall be treated        section 905 of the Water Resources Develop-
                                              ments in an order other than that estab-                as deauthorized for purposes of the aggregate          ment Act of 1986 (33 U.S.C. 2282);
                                              lished by subparagraph (A) if the Secretary             deauthorization amount specified in sub-                  (B) a feasibility study, as defined in section
                                              determines, on a case-by-case basis, that a             section (b)(2)(A).                                     105(d) of the Water Resources Development
                                              project or separable element is critical for              (3) PROJECTS IDENTIFIED IN APPENDIX.—A               Act of 1986 (33 U.S.C. 2215(d)); or
                                              interests of the United States, based on the            project or separable element of a project                 (C) a review conducted under section 216 of
                                              possible impact of the project or separable             identified in the appendix to the final de-            the Flood Control Act of 1970 (33 U.S.C. 549a),
                                              element on public health and safety, the na-            authorization list shall remain subject to fu-         including an initial appraisal that—
                                              tional economy, or the environment.                     ture deauthorization by Congress.                         (i) demonstrates a Federal interest; and
                                                 (4) PUBLIC COMMENT AND CONSULTATION.—                  (e) SPECIAL RULES.—                                     (ii) requires additional analysis for the
                                                 (A) IN GENERAL.—The Secretary shall so-                (1)     POST-AUTHORIZATION        STUDIES.—A         project or separable element.
                                              licit comments from the public and the Gov-             project or separable element of a project
                                                                                                                                                             SEC. 302. ABANDONED AND INACTIVE NONCOAL
                                              ernors of each applicable State on the pro-             may not be identified on the proposed de-                          MINE RESTORATION.
                                              posed deauthorization list prepared under               authorization list developed under sub-
                                                                                                                                                               Section 560(f) of the Water Resources De-
                                              paragraph (2)(A).                                       section (b), or the final deauthorization list
                                                                                                                                                             velopment Act of 1999 (33 U.S.C. 2336(f)) is
                                                 (B) COMMENT PERIOD.—The public comment               developed under subsection (c), if the project
                                                                                                                                                             amended by striking ‘‘$20,000,000’’ and insert-
                                              period shall be 90 days.                                or separable element received funding for a
                                                                                                                                                             ing ‘‘$30,000,000’’.
                                                 (5) PREPARATION OF FINAL DEAUTHORIZATION             post-authorization study during the current
                                                                                                      fiscal year or any of the 10 preceding fiscal          SEC. 303. TRIBAL PARTNERSHIP PROGRAM.
                                              LIST.—
                                                 (A) IN GENERAL.—The Secretary shall pre-             years.                                                   Section 203(b)(4) of the Water Resources
                                              pare a final deauthorization list by—                     (2) TREATMENT OF PROJECT MODIFICA-                   Development Act of 2000 (33 U.S.C. 2269) is
                                                 (i) considering any comments received                TIONS.—For purposes of this section, if an au-         amended by striking ‘‘$12,500,000’’ each place
                                              under paragraph (4); and                                thorized     water    resources    development         it appears and inserting ‘‘$18,500,000’’.
                                                 (ii) revising the proposed deauthorization           project or separable element of the project            SEC. 304. LAKES PROGRAM.
                                              list prepared under paragraph (2)(A) as the             has been modified by an Act of Congress, the             Section 602(a) of the Water Resources De-
                                              Secretary determines necessary to respond               date of the authorization of the project or            velopment Act of 1986 (Public Law 99–662, 100
                                              to such comments.                                       separable element shall be deemed to be the            Stat. 4148; 110 Stat. 3758; 113 Stat. 295; 121
                                                 (B) APPENDIX.—The Secretary shall include            date of the most recent such modification.             Stat. 1076) is amended—
                                              as part of the final deauthorization list an              (f)   DEAUTHORIZATION       OF    ANTIQUATED           (1) in paragraph (27), by striking ‘‘and’’ at
                                              appendix that—                                          PROJECTS.—                                             the end;
                                                 (i) identifies each project or separable ele-          (1) IN GENERAL.—Any water resources de-                (2) in paragraph (28), by striking the period
                                              ment on the proposed deauthorization list               velopment project, or separable element of a           at the end and inserting a semicolon; and
                                              that is not included on the final deauthoriza-          project, authorized for construction prior to            (3) by adding at the end the following:
                                              tion list; and                                          November 17, 1986, for which construction                ‘‘(29) Ellis Pond and Guild Pond, Norwood,
                                                 (ii) describes the reasons why the project           has not been initiated prior to the date of en-        Massachusetts; and
                                              or separable element is not included on the             actment of this Act, or for which funds have             ‘‘(30) Memorial Pond, Walpole, Massachu-
                                              final deauthorization list.                             not been obligated for construction in the 10-         setts.’’.
                                                                                                      year period prior to the date of enactment of
                                                 (c) SUBMISSION OF FINAL DEAUTHORIZATION                                                                     SEC. 305. REHABILITATION OF CORPS OF ENGI-
                                                                                                      this Act, is hereby deauthorized.                                  NEERS CONSTRUCTED DAMS.
                                              LIST TO CONGRESS FOR CONGRESSIONAL RE-
                                                                                                        (2) IDENTIFICATION.—Not later than 60 days
                                              VIEW; PUBLICATION.—                                                                                               Section 1177 of the Water Resources Devel-
                                                                                                      after the date of enactment of this Act, the
                                                 (1) IN GENERAL.—Not later than 90 days                                                                      opment Act of 2016 (33 U.S.C. 467f–2 note) is
                                                                                                      Secretary shall issue to the Committee on
                                              after the date of the close of the comment                                                                     amended—
                                                                                                      Transportation and Infrastructure of the
                                              period under subsection (b)(4), the Secretary                                                                     (1)   in    subsection    (e),   by    striking
                                                                                                      House of Representatives and the Committee
                                              shall—                                                                                                         ‘‘$40,000,000’’ and inserting ‘‘$60,000,000’’; and
                                                                                                      on Environment and Public Works of the
                                                 (A) submit the final deauthorization list                                                                      (2)   in    subsection    (f),   by    striking
                                                                                                      Senate a report that identifies—
                                              and appendix prepared under subsection                                                                         ‘‘$40,000,000’’ and inserting ‘‘$60,000,000’’.
                                                                                                        (A) the name of each project, or separable
                                              (b)(5) to the Committee on Transportation                                                                      SEC. 306. CHESAPEAKE BAY ENVIRONMENTAL
                                                                                                      element of a project, deauthorized by para-
                                              and Infrastructure of the House of Rep-                                                                                   RESTORATION AND PROTECTION
                                                                                                      graph (1); and                                                    PROGRAM.
                                              resentatives and the Committee on Environ-
                                                                                                        (B) the estimated current value of each
                                              ment and Public Works of the Senate; and                                                                          (a) IN GENERAL.—Section 510 of the Water
                                                                                                      such project or separable element of a
                                                 (B) publish the final deauthorization list                                                                  Resources Development Act of 1996 (Public
                                                                                                      project.
                                              and appendix in the Federal Register.                     (g) ECONOMIC AND ENVIRONMENTAL REVIEW                Law 104–303, 110 Stat. 3759; 121 Stat. 1202; 128
                                                 (2) EXCLUSIONS.—The Secretary shall not              OF INACTIVE WATER RESOURCES DEVELOPMENT                Stat. 1317) is amended—
                                              include in the final deauthorization list sub-          PROJECTS.—The Secretary or the non-Fed-                   (1) by redesignating subsection (h) as sub-
                                              mitted under paragraph (1) any project or               eral interest may not carry out any author-            section (i) and inserting after subsection (g)
                                              separable element with respect to which                 ized water resources development project, or           the following:




SSpencer on DSK126QN23PROD with HOUSE
                                              Federal funds for planning, design, or con-             separable element of such project, for which              ‘‘(h) PROJECT CAP.—The total cost of a
                                              struction are obligated after the develop-              construction has not been initiated in the 20-         project carried out under this section may
                                              ment of the preliminary list under sub-                 year period following the date of the author-          not exceed $15,000,000.’’; and
                                              section (b)(1)(A) but prior to the submission           ization of such project or separable element,             (2) in subsection (i) (as so redesignated), by
                                              of the final deauthorization list under para-           until—                                                 striking       ‘‘$40,000,000’’  and     inserting
                                              graph (1)(A) of this subsection.                          (1) the Secretary provides to the Com-               ‘‘$90,000,000’’.
                                                 (d) DEAUTHORIZATION; CONGRESSIONAL RE-               mittee on Transportation and Infrastructure               (b) OUTREACH AND TRAINING.—The Sec-
                                              VIEW.—                                                  of the House of Representatives and the                retary shall conduct public outreach and




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00054   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                       H6961
                                              workshops for non-Federal interests to pro-                (c) TRANSFER.—The Secretary may trans-              Pierhead line; thence northerly along said
                                              vide information on the Chesapeake Bay en-              fer any real property interests acquired               Pierhead line, to the intersection of the eas-
                                              vironmental restoration and protection pro-             under subsection (b) to any other Federal              terly right of way line of Van Ness Avenue,
                                              gram established under section 510 of the               agency or department without reimburse-                formerly Marlette Street, prolongation to
                                              Water Resources Development Act of 1996,                ment.                                                  the Pierhead line.
                                              including how to participate in the program.               (d) ISABELLA DAM SAFETY MODIFICATION                  ‘‘(b) REQUIREMENT THAT AREA BE IM-
                                              SEC. 307. UPPER MISSISSIPPI RIVER SYSTEM EN-            PROJECT DEFINED.—In this section, the term             PROVED.—The declaration of nonnavigability
                                                          VIRONMENTAL MANAGEMENT PRO-                 ‘‘Isabella Dam safety modification project’’           under subsection (a) applies only to those
                                                          GRAM.                                       means the dam safety modification project              parts of the area described in subsection (a)
                                                 Section 1103(e) of the Water Resources De-           at the Isabella Reservoir in the San Joaquin           that are or will be bulkheaded, filled, or oth-
                                              velopment Act of 1986 (33 U.S.C. 652(e)) is             Valley, California (authorized by Act of De-           erwise occupied or covered by permanent
                                              amended—                                                cember 22, 1944 (chapter 665, 58 Stat. 901)), in-      structures and does not affect the applica-
                                                 (1)   in    paragraph     (3),   by    striking      cluding the component of the project relat-            bility of any Federal statute or regulation
                                              ‘‘$22,750,000’’ and inserting ‘‘$40,000,000’’; and      ing to construction a visitor center facility.         that relates to filling of navigable waters or
                                                 (2)   in    paragraph     (4),   by    striking      SEC. 313. LOWER SAN JOAQUIN RIVER FLOOD
                                                                                                                                                             to other regulated activities within the area
                                              ‘‘$10,420,000’’ and inserting ‘‘$15,000,000’’.                     CONTROL PROJECT.                            described in subsection (a), including sec-
                                              SEC. 308. UPPER MISSISSIPPI RIVER PROTEC-                 The Secretary shall align the schedules of,          tions 9 and 10 of the Act of March 3, 1899 (33
                                                         TION.                                        and maximize complimentary efforts, mini-              U.S.C. 401, 403), section 404 of the Federal
                                                 Section 2010(e) of the Water Resources Re-                                                                  Water Pollution Control Act, and the Na-
                                                                                                      mize duplicative practices, and ensure co-
                                              form and Development Act of 2014 (128 Stat.                                                                    tional Environmental Policy Act of 1969.
                                                                                                      ordination and information sharing with re-
                                                                                                                                                               ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC
                                              1270; 132 Stat. 3812) is amended by striking            spect to—                                              DISTRICT.—Congress finds and declares that
                                              ‘‘the Act of October 15, 1940 (33 U.S.C. 701h–            (1) the project for flood risk management,           the area described in subsection (a) contains
                                              1)’’ and inserting ‘‘section 5 of the Act of            Lower San Joaquin River, authorized by sec-            the seawall, piers, and wharves that com-
                                              June 22, 1936 (33 U.S.C. 701h)’’.                       tion 1401(2) of the Water Resources Develop-           prise the Embarcadero Historic District list-
                                              SEC. 309. THEODORE SHIP CHANNEL, MOBILE,                ment Act of 2018 (132 Stat. 3836); and                 ed on the National Register of Historic
                                                         ALABAMA.                                       (2) the second phase of the feasibility study        Places on May 12, 2006.’’.
                                                (a) IN GENERAL.—The project for naviga-               for the Lower San Joaquin River project for              (b) CONFORMING AMENDMENT.—Section 5052
                                              tion, Theodore Ship Channel, Mobile Harbor,             flood risk management, authorized for expe-            of the Water Resources Development Act of
                                              Alabama, authorized by section 201 of the               dited completion by section 1203(a)(7) of the          2007 (33 U.S.C. 59h–1) is repealed.
                                              Flood Control Act of 1965 (42 U.S.C. 1962d–5),          Water Resources Development Act 2018 (132              SEC.   317.   WESTERN PACIFIC INTERCEPTOR
                                              is revised to incorporate into the project the          Stat. 3803).                                                         CANAL, SACRAMENTO RIVER, CALI-
                                              40-foot-deep, 1,320-foot-wide, and approxi-             SEC. 314. SACRAMENTO RIVER, GLENN-COLUSA,                            FORNIA.
                                              mately 1,468.5-foot-long access channel, ex-                        CALIFORNIA.                                  The portion of the project for flood protec-
                                              tending north from stations 257+25 and 273+25             The portion of project for flood control,            tion on the Sacramento River, authorized by
                                              from the Theodore Channel, that was con-                Sacramento River, California, authorized by            section 2 of the of March 1, 1917 (chapter 144,
                                              structed for the former Naval Station Mo-               section 2 of the Act of March 1, 1917 (chapter         39 Stat. 949; 45 Stat. 539; 50 Stat. 877; 55 Stat.
                                              bile, as a substitute for the authorized but            144, 39 Stat. 949; 103 Stat. 649; 110 Stat. 3709;      647; 80 Stat. 1422), consisting of the portion of
                                              unconstructed 40-foot-deep, 300-foot-wide,              112 Stat. 1841; 113 Stat. 299), consisting of a        the levee from G.P.S. coordinate N2147673.584
                                              and 1,200-foot-long anchorage basin in the              riverbed gradient restoration facility at the          E6690904.187 to N2147908.413 E6689057.060 asso-
                                              same location, to serve the public terminal             Glenn-Colusa Irrigation District Intake, is            ciated with the Western Pacific Interceptor
                                              that replaced the former Naval Station Mo-              no longer authorized beginning on the date             Canal, is no longer authorized beginning on
                                              bile as obligated under the authorizations for          of enactment of this Act.                              the date of the enactment of this Act.
                                              the project.                                            SEC. 315. SAN DIEGO RIVER AND MISSION BAY,             SEC. 318. RIO GRANDE ENVIRONMENTAL MAN-
                                                (b) TREATMENT.—The Secretary shall—                               SAN DIEGO COUNTY, CALIFORNIA.                          AGEMENT PROGRAM, COLORADO,
                                                (1) consider construction of the access                                                                                  NEW MEXICO, AND TEXAS.
                                                                                                        The portion of the project for flood control
                                              channel described in subsection (a) to be               and navigation, San Diego River and Mission              Section 5056(f) of the Water Resources De-
                                              complete; and                                           Bay, San Diego County, California, author-             velopment Act of 2007 (Public Law 110–114,
                                                (2) assume maintenance of the access chan-            ized by the Act of July 24, 1946 (chapter 595,         121 Stat. 1213; 128 Stat. 1314) is amended by
                                              nel described in subsection (a) for so long as          60 Stat. 636), identified in the National Levee        striking ‘‘2019’’ and inserting ‘‘2029’’.
                                              the terminal described in subsection (a) re-                                                                   SEC. 319. NEW LONDON HARBOR WATERFRONT
                                                                                                      Database established under section 9004 of
                                                                                                                                                                         CHANNEL, CONNECTICUT.
                                              mains publicly owned.                                   the Water Resources Development Act of
                                                                                                                                                               (a) IN GENERAL.—The portion of the project
                                              SEC. 310. MCCLELLAN-KERR ARKANSAS RIVER                 2007 (33 U.S.C. 3303) as the San Diego River 3
                                                         NAVIGATION SYSTEM.                                                                                  for navigation, New London Harbor, Con-
                                                                                                      segment and consisting of a 785-foot-long
                                                Any Federal funds, regardless of the ac-                                                                     necticut, authorized by the first section of
                                                                                                      segment of the right bank levee from Station
                                                                                                                                                             the Act of June 13, 1902 (chapter 1079, 32 Stat.
                                              count from which the funds were provided,               209+41.75 to its end at Station 217+26.75, as
                                                                                                                                                             333), described in subsection (b) is no longer
                                              used to carry out construction of the modi-             described in construction plans dated August
                                                                                                                                                             authorized beginning on the date of enact-
                                              fication to the McClellan-Kerr Arkansas                 30, 1951, is no longer authorized beginning on         ment of this Act.
                                              River Navigation System, authorized in sec-             the date of enactment of this Act.                       (b) AREA DESCRIBED.—The area referred to
                                              tion 136 of the Energy and Water Develop-               SEC. 316. SAN FRANCISCO, CALIFORNIA, WATER-            in subsection (a) is generally the portion be-
                                              ment Appropriations Act, 2004 (117 Stat.                            FRONT AREA.                                tween and around the 2 piers at the State
                                              1842), shall be considered by the Secretary as            (a) IN GENERAL.—Section 114 of the River             Pier in New London, specifically the area—
                                              initiating construction of the project such             and Harbor Act of 1968 (33 U.S.C. 59h) is                (1) beginning at a point N691263.78,
                                              that future funds will not require a new in-            amended to read as follows:                            E1181259.26;
                                              vestment decision.                                      ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATER-            (2) running N 35°01’50.75’’ W about 955.59
                                              SEC. 311. OUACHITA AND BLACK RIVERS, ARKAN-                           FRONT AREA.                              feet to a point N692046.26, E1180710.74;
                                                          SAS AND LOUISIANA.                             ‘‘(a) AREA TO BE DECLARED NONNAV-                     (3) running N 54°58’06.78’’ E about 100.00 feet
                                                The project for navigation, Ouachita and              IGABLE.—The following area is declared to be           to a point N692103.66, E1180792.62;
                                              Black Rivers, Arkansas and Louisiana, au-               nonnavigable waters of the United States:                (4) running S 35°01’50.75’’ E about 989.8 feet
                                              thorized by section 101 of the River and Har-           All of that portion of the City and County of          to a point N691293.17, E1181360.78; and
                                              bor Act of 1960 (74 Stat. 481), is modified to          San Francisco, California, lying shoreward of            (5) running S 73°51’15.45’’ W about 105.69
                                              include water supply as an authorized pur-              a line beginning at the intersection of the            feet to the point described in paragraph (1).
                                              pose.                                                   southerly right of way line of Earl Street             SEC. 320. WILMINGTON HARBOR, DELAWARE.
                                              SEC. 312. LAKE ISABELLA, CALIFORNIA.                    prolongation with the Pierhead United                    It is the sense of Congress that the Corps of
                                                (a) SENSE OF CONGRESS.—It is the sense of             States Government Pierhead line, the                   Engineers should maintain the annual main-
                                              Congress that the Secretary, when evalu-                Pierhead line as defined in the State of Cali-         tenance dredging for Wilmington Harbor,
                                              ating alternative locations for construction            fornia Harbor and Navigation Code Section              Delaware, authorized by the Act of June 3,
                                              of a permanent Isabella Lake Visitor Center             1770, as amended in 1961; thence northerly             1896 (chapter 314, 29 Stat. 207).
                                              by the Corps of Engineers to replace the fa-            along said Pierhead line to its intersection           SEC. 321. WILMINGTON HARBOR SOUTH DIS-
                                              cility impacted by the Isabella Dam safety              with a line parallel with and distant 10 feet                     POSAL AREA, DELAWARE.




SSpencer on DSK126QN23PROD with HOUSE
                                              modification project, should afford substan-            easterly from, the existing easterly bound-              (a) FINDING.—For the purposes of applying
                                              tial weight to the site preference of the local         ary line of Pier 30–32; thence northerly along         section 217(b) of the Water Resources Devel-
                                              community.                                              said parallel line and its northerly prolonga-         opment Act of 1996 (33 U.S.C. 2326a(b)) to the
                                                (b) AUTHORITY.—The Secretary may ac-                  tion, to a point of intersection with a line           Wilmington Harbor South Disposal Area,
                                              quire such interests in real property as the            parallel with, and distant 10 feet northerly           Delaware, the Secretary shall find that the
                                              Secretary determines necessary or advisable             from, the existing northerly boundary of               standard has been met for the Edgemoor ex-
                                              to support construction of the Isabella Dam             Pier 30–32; thence westerly along last said            pansion of the Port of Wilmington, Dela-
                                              safety modification project.                            parallel line to its intersection with said            ware.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00055   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6962                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                                 (b) USE.—Any use of the Wilmington Har-              432,351.28, thence to a point East 1,306,209.79          (b) NO LIABILITY.—The United States shall
                                              bor South Disposal Area permitted by the                and North 431,460.21, thence to a point at the         not be liable for any damages to property or
                                              Secretary under section 217(b) for the                  end of the channel near Hains Point East               injuries to persons from flooding that may
                                              Edgemoor Expansion of the Port of Wil-                  1,305,997.63 and North 429,978.31.                     be attributable to the operation and mainte-
                                              mington shall not otherwise reduce the                  SEC. 323. BIG CYPRESS SEMINOLE INDIAN RES-             nance of Rough River Dam, Kentucky, on
                                              availability of capacity, in dredged material                       ERVATION WATER CONSERVATION                land that was encumbered by a flowage ease-
                                              disposal facilities under the jurisdiction of                       PLAN, FLORIDA.                             ment extinguished under subsection (a).
                                              the Secretary that were constructed before                (a) IN GENERAL.—The project for ecosystem              (c) AUTHORIZATION OF APPROPRIATIONS.—
                                              the date of enactment of this Act, for oper-            restoration, Big Cypress Seminole Indian               There is authorized to be appropriated to
                                              ation and maintenance of—                               Reservation Water Conservation Plan, Flor-             carry out this section $10,000,000, to remain
                                                 (1) the Delaware River Mainstem and                  ida, authorized pursuant to section 528 of the         available until expended.
                                              Channel Deepening project, Delaware, New                Water Resources Development Act of 1996                SEC. 329. CALCASIEU RIVER AND PASS, LOU-
                                              Jersey, and Pennsylvania, authorized by sec-            (110 Stat. 3767), is no longer authorized be-                     ISIANA.
                                              tion 101(6) of the Water Resources Develop-             ginning on the date of enactment of this Act.            Not later than 120 days after the date of
                                              ment Act of 1992 (106 Stat. 4802); or                     (b) SAVINGS PROVISION.—Nothing in this               enactment of this Act, the Secretary shall
                                                 (2) the Delaware River, Philadelphia to the          section affects the responsibility of the Sec-         provide to the Committee on Transportation
                                              Sea, project, Delaware, New Jersey, Pennsyl-            retary to pay any damages awarded by the               and Infrastructure of the House of Rep-
                                              vania, authorized by the Act of June 25, 1910           Armed Services Board of Contract Appeals,              resentatives and the Committee on Environ-
                                              (chapter 382, 36 Stat. 637; 46 Stat. 921; 52 Stat.      or by a court of competent jurisdiction, to a          ment and Public Works of the Senate a re-
                                              803; 59 Stat. 14; 68 Stat. 1249; 72 Stat. 297).         contractor relating to the adjudication of             port on plans to modify the Calcasieu River
                                                 (c) FEE.—The Secretary shall impose on               claims arising from construction of the                and Pass Dredged Material Management
                                              the non-Federal interest for the Edgemoor               project described in subsection (a).                   Plan and Supplemental Environmental Im-
                                              Expansion of the Port of Wilmington a fee,                                                                     pact Statement (November 22, 2010 DMMP/
                                                                                                      SEC. 324. CENTRAL EVERGLADES, FLORIDA.
                                              under section 217(b)(1)(B) of the Water Re-                                                                    SEIS) to allow for the expansion of Dredged
                                                                                                        The project for ecosystem restoration,               Material Placement Facilities (DMPFs) 17,
                                              sources Development Act of 1996 (33 U.S.C.              Central Everglades, authorized by section
                                              2326a(b)(1)(B)), to recover capital, operation,                                                                19, 22, D, and E to the lakeside foreshore rock
                                                                                                      1401(4) of the Water Resources Development             boundaries during planned rehabilitation of
                                              and maintenance costs associated with any               Act of 2016 (130 Stat. 1713), is modified to in-
                                              use by the non-Federal interest of capacity                                                                    these facilities.
                                                                                                      clude the project for ecosystem restoration,           SEC. 330. CAMDEN HARBOR, MAINE.
                                              in the Wilmington Harbor South Disposal                 Central and Southern Florida, Everglades
                                              Area permitted by the Secretary under sec-                                                                       (a) IN GENERAL.—The portions         of the
                                                                                                      Agricultural Area, authorized by section 1308          project for navigation, Camden Harbor,
                                              tion 217(b) of the Water Resources Develop-             of the Water Resources Development Act of
                                              ment Act of 1996 pursuant to subsection (a)                                                                    Maine, described in subsection (b) are no
                                                                                                      2018 (132 Stat. 3819), and to authorize the Sec-       longer authorized beginning on the date of
                                              of this section.
                                                                                                      retary to carry out the project, as so com-            enactment of this Act.
                                                 (d) AGREEMENT TO PAY.—In accordance
                                              with section 217(a) of the Water Resources              bined, at a total combined cost of                       (b) PORTIONS DESCRIBED.—The portions re-
                                              Development Act of 1996 (33 U.S.C. 2326a(a)),           $4,362,091,000.                                        ferred to in subsection (a) are the following:
                                              if, to accommodate the dredged materials                SEC. 325. MIAMI RIVER, FLORIDA.                          (1) The portion of the 10-foot-deep inner
                                              from operation and maintenance of the                     The portion of the project for navigation,           harbor area, authorized by the first section
                                              Edgemoor Expansion of the Port of Wil-                  Miami River, Florida, authorized by the Act            of the Act of March 3, 1873 (chapter 233, 17
                                              mington, the Secretary provides additional              of July 3, 1930 (46 Stat. 925; 59 Stat. 16; 74         Stat. 565; 25 Stat. 400), approximately
                                              capacity at the Wilmington Harbor South                 Stat. 481; 100 Stat. 4257), beginning at the ex-       50,621.75 square feet in area—
                                              Disposal Area, the non-Federal interest for             isting railroad bascule bridge and extending             (A) starting at a point with coordinates
                                              the Edgemoor Expansion of the Port of Wil-              approximately 1,000 linear feet upstream to            N197,640.07, E837,851.71;
                                              mington shall agree to pay, during the pe-              an existing salinity barrier and flood control           (B) thence running S84°43’ 23.94’’W about
                                              riod of construction, all costs associated              structure, is no longer authorized beginning           381.51 feet to a point with coordinates
                                              with the construction of the additional ca-             on the date of enactment of this Act.                  N197,604.98, E837,471.82;
                                              pacity.                                                 SEC. 326. JULIAN KEEN, JR. LOCK AND DAM,                 (C) thence running N43°47’ 51.43’’W about
                                              SEC. 322. WASHINGTON HARBOR, DISTRICT OF                           MOORE HAVEN, FLORIDA.                       270.26 feet to a point with coordinates
                                                         COLUMBIA.                                      (a) DESIGNATION.—The Moore Haven Lock                N197,800.05, E837,284.77;
                                                Beginning on the date of enactment of this            and Dam, Moore Haven, Florida, authorized                (D) thence running S59°02’ 26.62’’E about
                                              Act, the project for navigation, Washington             pursuant to the Act of July 3, 1930 (chapter           219.18 feet to a point with coordinates
                                              Harbor, District of Columbia, authorized by             847, 46 Stat. 925; 49 Stat. 1032), shall be known      N197,687.30, E837,472.72;
                                              the Act of August 30, 1935 (chapter 831, 49             and designated as the ‘‘Julian Keen, Jr. Lock            (E) thence running S81°50’ 09.76’’E about
                                              Stat. 1031), is modified to reduce, in part, the        and Dam’’.                                             144.70 feet to a point with coordinates
                                              authorized dimensions of the project, such                (b) REFERENCES.—Any reference in a law,              N197,666.75, E837,615.96;
                                              that the remaining authorized dimensions                map, regulation, document, paper, or other               (F) thence running N57°27’ 07.42’’E about
                                              are as follows:                                         record of the United States to the Lock and            317.32 feet to a point with coordinates
                                                (1) A 200-foot-wide, 12-foot-deep channel             Dam referred to in subsection (a) shall be             N197,866.52, E837,928.96; and
                                              with a center line beginning at a point East            deemed to be a reference to the ‘‘Julian                 (G) thence running S18°50’ 04.48’’W about
                                              1,317,064.30 and North 440,373.32, thence to a          Keen, Jr. Lock and Dam’’.                              239.27 feet to the point described in subpara-
                                              point East 1,316,474.30 and North 440,028.31,           SEC. 327. TAYLOR CREEK RESERVOIR AND LEVEE             graph (A).
                                              thence to a point East 1,315,584.30 and North                       L–73 (SECTION 1), UPPER ST. JOHNS            (2) The portion of the 14-foot-deep outer
                                              439,388.30, thence to a point East 1,315,259.31                     RIVER BASIN, FLORIDA.                      harbor area, authorized by the first section
                                              and North 438,908.30.                                     The portions of the project for flood con-           of the Act of August 11, 1888 (25 Stat. 400; 32
                                                (2) A 200- to 300-foot-wide, 12-foot-deep             trol and other purposes, Central and South-            Stat. 331), approximately 222,015.94 square
                                              transition area, with a center line beginning           ern Florida, authorized by section 203 of the          feet in area—
                                              at a point East 1,315,259.31 and North                  Flood Control Act of 1948 (62 Stat. 1176), con-          (A) starting at a point with coordinates
                                              438,908.30 to a point East 1,315,044.31 and             sisting of the Taylor Creek Reservoir and              N197,640.07, E837,851.71;
                                              North 438,748.30.                                       Levee L–73, Section 1, within the Upper St.              (B) thence running N18°50’ 04.48’’E about
                                                (3) A 300-foot-wide, 15-foot-deep channel             Johns River Basin, Florida, are no longer au-          239.27 feet to a point with coordinates
                                              with a centerline beginning a point East                thorized beginning on the date of enactment            N197,866.53, E837,928.96;
                                              1,315,044.31 and North 438,748.30, thence to a          of this Act.                                             (C) thence running N58°28’ 51.05’’E about
                                              point East 1,314,105.31 and North 438,124.79,           SEC. 328. EXTINGUISHMENT OF FLOWAGE EASE-              308.48 feet to a point with coordinates
                                              thence to a point East 1,311,973.30 and North                       MENTS, ROUGH RIVER LAKE, KEN-              N198,027.79, E838,191.93;
                                              438,807.78, thence to a point East 1,311,369.73                     TUCKY.                                       (D) thence running N84°20’ 01.88’’E about
                                              and North 438,577.42, thence to a point East              (a) IN GENERAL.—Subject to the avail-                370.06 feet to a point with coordinates
                                              1,311,015.73 and North 438,197.57, thence to a          ability of appropriations and on request of            N198,064.33, E838,560.18;
                                              point East 1,309,713.47 and North 435,678.91.           the landowner, the Secretary shall extin-                (E) thence running S05°32’ 03.42’’E about
                                                (4) A 300- to 400-foot-wide, 15- to 24-foot-          guish any flowage easement or portion of a             357.31 feet to a point with coordinates
                                              deep transition area, with a center line be-            flowage easement held by the United States             N197,708.68, E838,594.64; and




SSpencer on DSK126QN23PROD with HOUSE
                                              ginning at a point East 1,309,713.47 and North          on developed land of the landowner at Rough              (F) thence running S84°43’ 23.94’’W about
                                              435,678.91 to a point East 1,307,709.33 and             River Lake, Kentucky—                                  746.08 feet to the point described in subpara-
                                              North 434,488.25.                                         (1) that is above 534 feet mean sea level;           graph (A).
                                                (5) A 400-foot-wide, 24-foot-deep channel             and                                                    SEC. 331. CAPE PORPOISE HARBOR, MAINE, AN-
                                              with a centerline beginning at a point East               (2) for which the Secretary determines the                       CHORAGE AREA DESIGNATION.
                                              1,307,709.33 and North 434,488.25, thence to a          flowage easement or portion of the flowage               (a) IN GENERAL.—The project for naviga-
                                              point East 1,307,459.33 and North 434,173.25,           easement is not required to address back-              tion, Cape Porpoise Harbor, Maine, author-
                                              thence to a point East 1,306,476.82 and North           water effects.                                         ized by section 101 of the River and Harbor




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00056   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6963
                                              Act of 1948 (62 Stat. 1172), is modified to des-          ‘‘(5) IMPLEMENTATION.—As part of a sedi-             of 29,100 acre-feet of storage space pursuant
                                              ignate the portion of the project described in          ment management plan under paragraph (2),              to section 5 of Public Law 97–140; and
                                              subsection (b) as a 6-foot-deep anchorage.              and in accordance with paragraph (10), the               (2) amend or enter into new storage agree-
                                                (b) PORTION DESCRIBED.—The portion of the             Secretary may carry out sediment removal               ments for storage of San Juan-Chama
                                              project referred to in subsection (a) is the ap-        activities at reservoirs owned and operated            project water or native Rio Grande system
                                              proximately 192,235.63 square foot area con-            by the Secretary in the Upper Missouri River           water up to the space allocated for each enti-
                                              sisting of the 100-foot-wide and 6-foot-deep            Basin, or at reservoirs for which the Sec-             ty’s proportionate share of San Juan-Chama
                                              channel located within the inner harbor—                retary has flood control responsibilities              water.
                                                (1) starting at a point with coordinates N            under section 7 of the Act of December 22,               (e) OPERATIONS DOCUMENTS.—The Sec-
                                              194,175.13, E 2,882,011.74;                             1944 (33 U.S.C. 709), in the Upper Missouri            retary shall amend or revise any existing op-
                                                (2) thence running N33°46’ 08.14’’W about             River Basin, in accordance with section 602            erations documents, including the Water
                                              914.57 feet to a point with coordinates N               of the Water Resources Development Act of              Control Manual or operations plan for
                                              194,935.40, E 2,881,503.38;                             1986 (100 Stat. 4148; 110 Stat. 3758; 113 Stat.        Abiquiu Reservoir, as necessary to meet the
                                                (3) thence running N12°41’ 09.78’’W about             295; 121 Stat. 1076) as if those reservoirs were       requirements of this section.
                                              1,026.40 feet to a point with coordinates N             listed in subsection (a) of that section.’’.             (f) LIMITATIONS.—In carrying out this sec-
                                              195,936.74, E 2,881,277.97;                             SEC. 335. PORTSMOUTH, NEW HAMPSHIRE.                   tion, the following limitations shall apply:
                                                (4) thence running N77°18’ 50.22’’E about                                                                      (1) The storage of native Rio Grande sys-
                                                                                                        The Secretary shall expedite the activities
                                              100.00 feet to a point with coordinates N                                                                      tem water shall be subject to the provisions
                                                                                                      required to be carried out under section 204
                                              195,958.70, E 2,881,375.53;                                                                                    of the Rio Grande Compact and the resolu-
                                                                                                      of the Water Resources Development Act of
                                                (5) thence running S12°41’ 09.78’’E about                                                                    tions of the Rio Grande Compact Commis-
                                                                                                      1992 (33 U.S.C. 2326) regarding the use of im-
                                              1,007.79 feet to a point with coordinates N                                                                    sion.
                                                                                                      provement dredging of the Portsmouth Fed-
                                              194,975.52, E 2,881,596.85;                                                                                      (2) The storage of native Rio Grande sys-
                                                                                                      eral navigation project in Portsmouth, New
                                                (6) thence running S33°46’ 08.14’’E about                                                                    tem water shall only be authorized to the ex-
                                                                                                      Hampshire, carried out pursuant to section 3
                                              895.96 feet to a point with coordinates N                                                                      tent that the necessary water ownership and
                                                                                                      of the Act of August 13, 1946 (33 U.S.C. 426g),
                                              194,230.72, E 2,882,094.86; and                                                                                storage rights have been acquired by the en-
                                                                                                      as a source of clean beach fill material to re-
                                                (7) thence running S56°13’ 51.86’’W about                                                                    tity requesting such storage.
                                                                                                      inforce the stone revetment at Nantasket
                                              100.00 feet to the point described in para-                                                                      (3) The storage of native Rio Grande sys-
                                                                                                      Beach, Hull, Massachusetts.
                                              graph (1).                                                                                                     tem water or San-Juan Chama project water
                                                                                                      SEC. 336. RAHWAY FLOOD RISK MANAGEMENT
                                              SEC. 332. BALTIMORE, MARYLAND.                                     FEASIBILITY STUDY, NEW JERSEY.
                                                                                                                                                             shall not interfere with the authorized pur-
                                                The Secretary is authorized, in accordance                                                                   poses of the Abiquiu Dam and Reservoir
                                                                                                        The Secretary shall—
                                              with section 5 of Act of June 22, 1936 (33                                                                     project.
                                                                                                        (1) nullify the determination of the North
                                              U.S.C. 701h), to accept funds contributed by                                                                     (4) Each user of storage space, regardless of
                                                                                                      Atlantic Division of the Corps of Engineers
                                              a non-Federal interest for dredging on irreg-                                                                  source of water, shall pay for any increase in
                                                                                                      that further activities to carry out the feasi-
                                              ular cycles of the Baltimore Inner Harbor                                                                      costs attributable to storage of that user’s
                                                                                                      bility study for a project for flood risk man-
                                              Approach Channel, Baltimore Harbor and                                                                         water.
                                                                                                      agement, Rahway, New Jersey, authorized
                                              Channels Federal navigation project, author-                                                                   SEC. 338. FLUSHING BAY AND CREEK FEDERAL
                                                                                                      by the resolution of the Committee on                              NAVIGATION CHANNEL, NEW YORK.
                                              ized by section 101 of the River and Harbor
                                                                                                      Transportation and Infrastructure of the                 (a) IN GENERAL.—The portion of the project
                                              Act of 1958 (72 Stat. 297).
                                                                                                      House of Representatives adopted on March              for navigation, Flushing Bay and Creek, New
                                              SEC.   333.
                                                        THAD COCHRAN LOCK AND DAM,
                                                         AMORY, MISSISSIPPI.
                                                                                                      24, 1998 (docket number 2548), is not war-             York, authorized by the first section of the
                                                                                                      ranted;                                                Act of March 3, 1905 (chapter 1482, 33 Stat.
                                                (a) SENSE OF CONGRESS.—It is the sense of
                                              Congress that Thad Cochran, whose selfless                (2) identify an acceptable alternative to            1120; 52 Stat. 803; 76 Stat. 1174), described in
                                              determination and tireless work, while serv-            the project described in paragraph (1) that            subsection (b) is no longer authorized begin-
                                              ing as a congressman and United States Sen-             could receive Federal support; and                     ning on the date of enactment of this Act.
                                              ator from Mississippi for 45 years, contrib-              (3) carry out, and expedite the completion             (b) PORTION DESCRIBED.—The portion re-
                                              uted greatly to the realization and success of          of, a feasibility study for the acceptable al-         ferred to in subsection (a) is the portion from
                                              the Tennessee-Tombigbee Waterway.                       ternative identified under paragraph (2).              river mile 2.5 to river mile 2.9, as bounded
                                                (b) DESIGNATION.—The navigation lock                  SEC. 337. SAN JUAN-CHAMA PROJECT; ABIQUIU              by—
                                              known as the ‘‘Amory Lock’’, located at mile                        DAM, NEW MEXICO.                             (1) the coordinates of—
                                              371 on the Tennessee-Tombigbee Waterway,                  (a) ABIQUIU RESERVOIR.—Section 5(b) of                 (A) Latitude North 40° 45’ 45.61’’ Longitude
                                              Mississippi, and the dam associated with                Public Law 97–140 (43 U.S.C. 620a note) is             West 73° 50’ 20.19’’;
                                              such lock, shall be known and designated as             amended by striking ‘‘a total of two hundred             (B) Latitude North 40° 45’ 47.02’’ Longitude
                                              the ‘‘Thad Cochran Lock and Dam’’.                      thousand acre-feet of’’.                               West 73° 50’ 10.80’’;
                                                (c) REFERENCES.—Any reference in a law,                 (b) WATER STORAGE AT ABIQUIU DAM, NEW                  (C) Latitude North 40° 45’ 26.71’’ Longitude
                                              map, regulation, document, paper, or other              MEXICO.—Section 1 of Public Law 100–522 (43            West 73° 50’ 10.85’’; and
                                              record of the United States to the lock and             U.S.C. 620a note) is amended—                            (D) Latitude North 40° 45’ 26.72’’ Longitude
                                              dam referred to in subsection (b) shall be                (1) by striking ‘‘200,000 acre-feet of’’;            West 73° 50’ 10.96’’; and
                                              deemed to be a reference to the ‘‘Thad Coch-              (2) by inserting ‘‘and San Juan-Chama                  (2) the New York Long Island State Plane
                                              ran Lock and Dam’’.                                     project’’ after ‘‘Rio Grande system’’; and             (US Survey Feet, NAD–83), as follows:
                                              SEC. 334. MISSOURI RIVER RESERVOIR SEDI-                  (3) by striking ‘‘, in lieu of the water stor-         (A)     Easting       x1028866.501   Northing
                                                         MENT MANAGEMENT.                             age authorized by section 5 of Public Law 97–          y217179.294;
                                                 Section 1179(a) of the Water Resources De-           140, to the extent that contracting entities             (B)     Easting       x1029588.853   Northing
                                              velopment Act of 2016 (130 Stat. 1675; 132              under section 5 of Public Law 97–140 no                y217322.675;
                                              Stat. 3782) is amended—                                 longer require such storage’’.                           (C)     Easting       x1029588.853   Northing
                                                 (1) in paragraph (3)—                                  (c) WATER STORAGE.—The Secretary shall—              y215267.486; and
                                                 (A) in subparagraph (B), by inserting                  (1) store up to elevation 6230.00 NGVD29 at            (D)     Easting       x1028964.587   Northing
                                              ‘‘project purposes, including’’ before ‘‘stor-          Abiquiu Dam, New Mexico, to the extent                 y215267.486.
                                              age capacity’’; and                                     that the necessary real property interests             SEC. 339. RUSH RIVER AND LOWER BRANCH
                                                 (B) in subparagraph (C), by striking ‘‘pre-          have been acquired by any entity requesting                       RUSH RIVER, NORTH DAKOTA.
                                              liminary’’;                                             such storage; and                                        (a) IN GENERAL.—The portion of the com-
                                                 (2) by redesignating paragraphs (4) through            (2) amend the March 20, 1986, contract be-           prehensive plan for flood control and other
                                              (9) as paragraphs (6) through (11), respec-             tween the United States of America and the             purposes in the Red River of the North drain-
                                              tively; and                                             Albuquerque Bernalillo County Water Util-              age basin, North Dakota, South Dakota, and
                                                 (4) by inserting after paragraph (3) the fol-        ity Authority (assigned by the City of Albu-           Minnesota, authorized by section 203 of the
                                              lowing:                                                 querque, New Mexico to the Albuquerque                 Flood Control Act of 1948 (62 Stat. 1177; 64
                                                 ‘‘(4) JUSTIFICATION.—In determining the              Bernalillo County Water Utility Authority)             Stat. 176), consisting of clearing and rec-
                                              economic justification of a sediment man-               for water storage space in Abiquiu Reservoir           tification of the channel from mile 28.3 near
                                              agement plan under paragraph (2), the Sec-              to allow for storage by the Albuquerque                Amenia to the mouth of the Rush River,
                                              retary shall—                                           Bernalillo County Water Utility Authority              known as Cass County Drain No. 12, is no
                                                 ‘‘(A) measure and include flooding, erosion,         of San Juan-Chama project water or native              longer authorized beginning on the date of




SSpencer on DSK126QN23PROD with HOUSE
                                              and accretion damages both upstream and                 Rio Grande system water up to elevation                enactment of this Act.
                                              downstream of the reservoir that are likely             6230.00 NGVD29.                                          (b) LOWER BRANCH RUSH RIVER.—The
                                              to occur as a result of sediment management               (d) STORAGE AGREEMENTS WITH USERS                    project for flood control, Lower Branch Rush
                                              within the reservoir compared to the dam-               OTHER THAN THE ALBUQUERQUE BERNALILLO                  River, North Dakota, carried out under sec-
                                              ages that are likely to occur if the sediment           COUNTY WATER UTILITY AUTHORITY.—The                    tion 205 of the Flood Control Act of 1948 (33
                                              management plan is not implemented; and                 Secretary shall—                                       U.S.C. 701s), known as Cass County Drain No.
                                                 ‘‘(B) include lifecycle costs and a 100-year           (1) retain or enter into new agreements              2, is no longer authorized beginning on the
                                              period of analysis.                                     with entities for a proportionate allocation           date of enactment of this Act.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00057   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6964                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              SEC. 340. PAWCATUCK RIVER, LITTLE NARRA-                  (4) is located in a city with a population of          (2) in subsection (g)—
                                                         GANSETT BAY AND WATCH HILL                   80,000 or less.                                          (A) by striking the period at the end and
                                                         COVE, RHODE ISLAND AND CON-
                                                                                                      SEC. 346. SURPLUS WATER CONTRACTS AND                  inserting ‘‘; or’’;
                                                         NECTICUT.
                                                                                                                 WATER STORAGE AGREEMENTS.                     (B) by striking ‘‘means a community’’ and
                                                Beginning on the date of enactment of this
                                                                                                        Section 1046(c)(3) of the Water Resources            inserting the following: ‘‘means—
                                              Act, that portion of the project for naviga-
                                              tion, Pawcatuck River, Little Narragansett              Reform and Development Act of 2014 (128                  ‘‘(1) a community’’; and
                                              Bay and Watch Hill Cove, Rhode Island and               Stat. 1254; 132 Stat. 3784) is amended by                (C) by adding at the end the following:
                                              Connecticut, authorized by section 2 of the             striking ‘‘12’’ and inserting ‘‘16’’.                    ‘‘(2) a regional water system that serves a
                                              Act of March 2, 1945 (chapter 19, 59 Stat. 13),         SEC. 347. NO WAKE ZONES IN NAVIGATION CHAN-            population of less than 100,000, for which the
                                                                                                                  NELS.                                      per capita income is less than the per capita
                                              consisting of a 10-foot-deep, 16-acre anchor-
                                              age area in Watch Hill Cove is no longer au-              Section 1149 of the Water Resources Devel-           income of not less than 50 percent of the
                                              thorized.                                               opment Act of 2016 (33 U.S.C. 1223 note)               counties in the United States.’’.
                                              SEC. 341. HARRIS COUNTY, TEXAS.                         amended—
                                                                                                        (1) by striking ‘‘recreational’’ in each place       SEC. 351. FLOOD CONTROL AND OTHER PUR-
                                                Section 575 of the Water Resources Devel-                                                                               POSES.
                                              opment Act of 1996 (110 Stat. 3789; 113 Stat.           it appears and inserting ‘‘covered’’; and
                                              311; 121 Stat. 1253) is repealed.                         (2) by amending subsection (c) to read as              Section 103(k) of the Water Resources De-
                                              SEC. 342. CAP SANTE WATERWAY, WASHINGTON.               follows:                                               velopment Act of 1986 (33 U.S.C. 2213) is
                                                Beginning on the date of enactment of this              ‘‘(c) DEFINITIONS.—In this section:                  amended—
                                              Act, the project for navigation, Cap Sante                ‘‘(1) COVERED NAVIGATION CHANNEL.—The                  (1) by striking ‘‘Except as’’ and inserting
                                              Waterway and Navigation Channel, Skagit                 term ‘covered navigation channel’ means a              the following:
                                              County, Washington, authorized by the Act               navigation channel that—                                 ‘‘(1) IN GENERAL.—Except as’’; and
                                              of March 2, 1919 (chapter 95, 40 Stat. 1285), is          ‘‘(A) is federally marked or maintained;               (2) by adding at the end the following:
                                              modified to deauthorize the portion of the                ‘‘(B) is part of the Atlantic Intracoastal             ‘‘(2) RENEGOTIATION OF TERMS.—
                                              project consisting of an approximately                  Waterway; and                                            ‘‘(A) IN GENERAL.—At the request of a non-
                                              334,434-foot area of the Federal channel with-            ‘‘(C) is adjacent to a marina.                       Federal interest, the Secretary and the non-
                                              in Anacortes Harbor inside and directly adja-             ‘‘(2) COVERED VESSEL.—The term ‘covered              Federal interest may renegotiate the terms
                                              cent to the Federal breakwater and training             vessel’ means a recreational vessel or an              and conditions of an eligible deferred pay-
                                              wall structure, starting at a point with co-            uninspected passenger vessel, as such terms            ment, including—
                                              ordinates N557015.552, E1210819.619, thence             are defined in section 2101 of title 46, United          ‘‘(i) permitting the non-Federal contribu-
                                              running S88 13’2.06’’E approximately 200 feet           States Code.’’.                                        tion to be made without interest, pursuant
                                              to a point with coordinates N557009.330,                SEC. 348. LIMITATION ON CONTRACT EXECUTION             to paragraph (1);
                                              E1211019.522, thence running S01 46’58.08’’W                         IN THE ARKANSAS RIVER BASIN.
                                                                                                                                                               ‘‘(ii) recalculation of the interest rate;
                                              approximately 578 feet to a point with co-                (a) DEFINITION OF COVERED CONTRACT.—In                 ‘‘(iii) full or partial forgiveness of interest
                                              ordinates N556431.405, E1211001.534, thence             this section, the term ‘‘covered contract’’            accrued during the period of construction;
                                              running S49 49’50.23’’W approximately 69 feet           means a contract between any local govern-             and
                                              to a point with coordinates N556387.076,                mental entity and the Secretary for water                ‘‘(iv) a credit against construction interest
                                              E1210949.002, thence running S51 53’0.25’’E ap-         supply storage in a Federal or non-Federal             for a non-Federal investment that benefits
                                              proximately 35 feet to a point with coordi-             hydropower lake within the Arkansas River
                                                                                                                                                             the completion or performance of the project
                                              nates N556365.662, E1210976.316, thence run-            Basin.
                                                                                                                                                             or separable element.
                                              ning S49 38’58.48’’W approximately 112 feet to            (b) LIMITATION.—For any new covered con-
                                                                                                                                                               ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An eli-
                                              a    point   with    coordinates   N556292.989,         tract for a hydropower lake that is entered
                                                                                                                                                             gible deferred payment agreement under sub-
                                              E1210890.775, thence running N88 13’1.87’’W             into during the period beginning on the date
                                                                                                                                                             paragraph (A) is an agreement for which—
                                              approximately 109 feet to a point with co-              of enactment of this Act and ending on De-
                                                                                                                                                               ‘‘(i) the non-Federal contribution was
                                              ordinates N556296.367, E1210782.226, thence             cember 31, 2022, a local governmental entity
                                                                                                                                                             made with interest;
                                              running S46 46’58.97’’W approximately 141               shall not pay more than 110 percent of the
                                                                                                                                                               ‘‘(ii) the period of project construction ex-
                                              feet to a point with coordinates N556199.527,           initial principal cost for the acre-feet being
                                                                                                      sought for the new covered contract for that           ceeds 10 years from the execution of a
                                              E1210679.164, thence running N88 13’1.77’’W                                                                    project partnership agreement or appropria-
                                              approximately 700 feet to a point with co-              hydropower lake.
                                                                                                                                                             tion of funds; and
                                              ordinates N556221.305, E1209979.502, thence             SEC. 349. WAIVER OF NON-FEDERAL SHARE OF
                                                                                                                                                               ‘‘(iii) the construction interest exceeds
                                              running N01 46’58.08’’E approximately 250 feet                     DAMAGES RELATED TO CERTAIN
                                                                                                                 CONTRACT CLAIMS.                            $45,000,000.
                                              to a point with coordinates N556471.184,
                                                                                                        In a case in which the Armed Services                  ‘‘(3) CREDIT FOR NON-FEDERAL CONTRIBU-
                                              E1209987.280, thence running S88 13’1.77’’E ap-
                                                                                                      Board of Contract Appeals or other court of            TION.—
                                              proximately 815 feet to a point with coordi-
                                                                                                      competent jurisdiction has rendered a deci-              ‘‘(A) IN GENERAL.—The Secretary is author-
                                              nates N556445.828, E1210801.886, thence run-
                                                                                                      sion during the period beginning on Decem-             ized to credit any costs incurred by the non-
                                              ning N01 46’58.08’’E approximately 570 feet to
                                                                                                      ber 1, 2017, and ending on December 31, 2022,          Federal interest (including in-kind contribu-
                                              the point of origin.
                                                                                                      awarding damages to a contractor relating              tions) to remedy a design or construction de-
                                              SEC. 343. LOCAL GOVERNMENT RESERVOIR PER-
                                                          MIT REVIEW.                                 to the adjudication of claims arising from             ficiency of a covered project or separable ele-
                                                Section 1119(b) of the Water Resources De-            the construction of an authorized water re-            ment toward the non-Federal share of the
                                              velopment Act of 2018 (33 U.S.C. 2347 note) is          sources    development     project,  notwith-          cost of the covered project, if the Secretary
                                              amended by striking ‘‘owned or operated by              standing the terms of the Project Partner-             determines the remedy to be integral to the
                                              the Secretary’’.                                        ship Agreement, the Secretary shall waive              completion or performance of the covered
                                              SEC. 344. PROJECT MODIFICATIONS FOR IM-                 payment of the share of the non-Federal in-            project.
                                                         PROVEMENT OF ENVIRONMENT.                    terest of those damages, including attorney’s            ‘‘(B) CREDIT OF COSTS.—If the non-Federal
                                                Section 1203(g) of the Water Resources De-            fees, if—                                              interest incurs costs or in-kind contributions
                                              velopment Act of 2018 (132 Stat. 3805) is                 (1)(A) the contracting officer was in-               for a project to remedy a design or construc-
                                              amended, in the matter preceding paragraph              structed by the Corps of Engineers to modify           tion deficiency of a project or separable ele-
                                              (1), by striking ‘‘For fiscal years 2019 and            the terms of the contract or terminate the             ment which has a 100 percent Federal cost
                                              2020’’ and inserting ‘‘Until September 30,              contract; and                                          share, and the Secretary determines the
                                              2024’’.                                                   (B) the Armed Services Board of Contract             remedy to be integral to the completion or
                                              SEC. 345. AQUATIC ECOSYSTEM RESTORATION.                Appeals or other court of competent jurisdic-          performance of the project, the Secretary is
                                                For fiscal years 2021 through 2024, in car-           tion determined that the failure of the con-           authorized to credit such costs to any inter-
                                              rying out section 206 of the Water Resources            tracting officer to timely take the action de-         est accrued on a deferred non-Federal con-
                                              Development Act of 1996 (33 U.S.C. 2330), the           scribed in subparagraph (A) was a material             tribution.
                                              Secretary shall give priority to a project to           breach of the contract that resulted in dam-             ‘‘(4) TREATMENT OF PRE-PAYMENT.—Not-
                                              restore and protect an aquatic ecosystem or             ages to the contractor awarded by the Armed            withstanding a deferred payment agreement
                                              estuary that—                                           Services Board of Contract Appeals or the              with a non-Federal interest, the Secretary
                                                (1) is located in the South Platte River              court, as applicable; or                               shall accept, without interest of any type,
                                              Basin;                                                    (2) the claims arose from construction of a          the repayment of a non-Federal contribution




SSpencer on DSK126QN23PROD with HOUSE
                                                (2) is located on a body of water that is             project deauthorized under this title.                 for any eligible deferred payment described
                                              identified by the applicable State pursuant             SEC.   350.   REDUCED PRICING FOR           CERTAIN    in paragraph (2)(B) for which—
                                              to section 303(d) of the Federal Water Pollu-                         WATER SUPPLY STORAGE.                      ‘‘(A) the non-Federal interest makes a pay-
                                              tion Control Act (33 U.S.C. 1313(d)) as being             Section 322 of the Water Resources Devel-            ment of at least $200 million for that eligible
                                              impaired;                                               opment Act of 1990 (33 U.S.C. 2324) is amend-          deferred payment agreement on or before
                                                (3) has the potential to provide flood risk           ed—                                                    September 30, 2021; and
                                              management and recreational benefits in ad-               (1) in subsection (b), by striking ‘‘2,000,000’’       ‘‘(B) the non-Federal interest repays the
                                              dition to ecosystem restoration benefits; and           and inserting ‘‘3,000,000’’; and                       remaining principal by September 30, 2023.’’.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00058   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6965
                                              SEC. 352. ADDITIONAL ASSISTANCE FOR CRIT-               ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;       No. DACW43–88–C–0036, dated March 10, 1988,
                                                         ICAL PROJECTS.                               121 Stat. 1268) is amended by striking                 between the United States and the State of
                                                (a) CONSISTENCY WITH REPORTS.—Congress                ‘‘$25,000,000’’ and inserting ‘‘$75,000,000’’.         Missouri, to implement the modifications re-
                                              finds that the project modifications de-                   (12) WESTERN RURAL WATER.—Section 595 of            quired under subparagraphs (A) and (B).
                                              scribed in this section are in accordance with          the Water Resources Development Act of                   (2) CITY OF PLATTSBURG.—
                                              the reports submitted to Congress by the                1999 (113 Stat. 383; 117 Stat. 139; 117 Stat. 142;       (A) IN GENERAL.—The project for Smith-
                                              Secretary under section 7001 of the Water               117 Stat. 1836; 118 Stat. 440; 121 Stat. 1219; 123     ville Lake, Missouri, authorized pursuant to
                                              Resources Reform and Development Act of                 Stat. 2851; 128 Stat. 1316; 130 Stat. 1681) is         section 204 of the Flood Control Act of 1965
                                              2014 (33 U.S.C. 2282d), titled ‘‘Report to Con-         amended—                                               (79 Stat. 1080), is modified to release the City
                                              gress on Future Water Resources Develop-                   (A) by striking the section heading and in-         of Plattsburg, Missouri, from—
                                              ment’’, or have otherwise been reviewed by                                                                       (i) 8,850 acre-feet of future water supply
                                                                                                      serting ‘‘WESTERN RURAL WATER.’’;
                                              Congress.                                                                                                      storage contracts; and
                                                                                                         (B) in subsection (b), by inserting ‘‘Ari-
                                                 (b) MODIFICATIONS.—                                                                                           (ii) future financial obligations for the vol-
                                                 (1) SACRAMENTO AREA, CALIFORNIA.—Sec-                zona,’’ before ‘‘rural Idaho’’;
                                                                                                         (C) in subsection (c), by inserting ‘‘Ari-          ume of storage described in clause (i).
                                              tion 219(f)(23) of the Water Resources Devel-                                                                    (B) AMENDMENT TO CONTRACT.—The Sec-
                                              opment Act of 1992 (106 Stat. 4835; 113 Stat.           zona,’’ before ‘‘Idaho’’; and
                                                                                                         (D) in subsection (i), by striking ‘‘for the        retary shall amend water supply contract
                                              336; 117 Stat. 1840) is amended to read as fol-                                                                No. DACW41–73–C–0008, between the United
                                              lows:                                                   period beginning with fiscal year 2001,
                                                                                                      $435,000,000, to remain available until ex-            States and the State of Missouri, to imple-
                                                 ‘‘(23) SACRAMENTO AREA, CALIFORNIA.—                                                                        ment the modifications under subparagraph
                                              $45,000,000 for regional water conservation,            pended.’’ and inserting the following: ‘‘, to
                                                                                                      remain available until expended—                       (A).
                                              recycling, reliability, and resiliency projects                                                                  (3) CITY OF SMITHVILLE.—
                                              in Placer, El Dorado, and Sacramento Coun-                 ‘‘(1) for the period beginning with fiscal
                                                                                                      year 2001, $435,000,000 for Idaho, Montana,              (A) IN GENERAL.—The project for Smith-
                                              ties and the San Juan Suburban Water Dis-                                                                      ville Lake, Missouri, authorized pursuant to
                                              trict, California.’’.                                   rural Nevada, New Mexico, rural Utah, and
                                                                                                      Wyoming; and                                           section 204 of the Flood Control Act of 1965
                                                 (2) SOUTH PERRIS, CALIFORNIA.—Section                                                                       (79 Stat. 1080), is modified to release the City
                                              219(f)(52) of the Water Resources Develop-                 ‘‘(2) $150,000,000 for Arizona.’’.
                                                                                                         (13) CENTRAL WEST VIRGINIA.—Section                 of Smithville, Missouri, from—
                                              ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;                                                                 (i) 6,000 acre-feet of future water supply
                                              114 Stat. 2763A–220) is amended by striking             571(h) of the Water Resources Development
                                                                                                      Act of 1999 (113 Stat. 371; 121 Stat. 1257) is         storage contracts; and
                                              ‘‘$25,000,000’’ and inserting ‘‘$50,000,000’’.                                                                   (ii) future financial obligations for the vol-
                                                 (3) MADISON AND ST. CLAIR COUNTIES, ILLI-            amended by striking ‘‘$20,000,000’’ and insert-
                                                                                                      ing ‘‘$100,000,000’’.                                  ume of storage described in clause (i).
                                              NOIS.—Section 219(f)(55) of the Water Re-
                                                                                                         (14) SOUTHERN WEST VIRGINIA.—Section                  (B) AMENDMENT TO CONTRACT.—The Sec-
                                              sources Development Act of 1992 (106 Stat.                                                                     retary shall amend water supply contract
                                              4835; 113 Stat. 335; 114 Stat. 2763A–221) is            340(g) of the Water Resources Development
                                                                                                      Act of 1992 (106 Stat. 4856; 110 Stat. 3727; 113       No. DACW–41–73–C–0007, between the United
                                              amended by striking ‘‘$10,000,000’’ and insert-                                                                States and the State of Missouri, to imple-
                                              ing ‘‘$45,000,000’’.                                    Stat.      320)    is   amended       by  striking
                                                                                                      ‘‘$40,000,000’’ and inserting ‘‘$120,000,000’’.        ment the modifications under subparagraph
                                                 (4) SOUTHERN AND EASTERN KENTUCKY.—                                                                         (A).
                                              Section 531 of the Water Resources Develop-                (c) LOWELL CREEK TUNNEL, SEWARD, ALAS-
                                                                                                      KA.—Section 5032(a)(2) of the Water Re-                  (b) FLOOD RISK MANAGEMENT.—The fol-
                                              ment Act of 1996 (110 Stat. 3773; 113 Stat. 348;                                                               lowing project modifications for flood risk
                                              117 Stat. 142; 121 Stat. 1226) is amended—              sources Development Act of 2007 (Public Law
                                                                                                      110–114, 121 Stat. 1205) is amended by striking        management, as identified in a report enti-
                                                 (A) in subsection (g), by inserting ‘‘Boyd,                                                                 tled ‘‘Report to Congress on Future Water
                                                                                                      ‘‘15’’ and inserting ‘‘20’’.
                                              Carter, Elliott, Lincoln,’’ after ‘‘Lee,’’; and                                                                Resources Development’’, and submitted to
                                                                                                         (d) CAPE ARUNDEL DISPOSAL SITE, MAINE.—
                                                 (B) in subsection (h), by striking                   Section 1312 of the Water Resources Develop-           Congress pursuant to section 7001 of the
                                              ‘‘$40,000,000’’ and inserting ‘‘$100,000,000’’.         ment Act of 2018 (132 Stat. 3821) is amended           Water Resources Reform and Development
                                                 (5) DESOTO COUNTY, MISSISSIPPI.—Section              by striking ‘‘December 31, 2021’’ and insert-          Act of 2014 (33 U.S.C. 2282d) or otherwise re-
                                              219(f)(30) of the Water Resources Develop-              ing ‘‘September 30, 2024’’.                            viewed by Congress, are authorized to be car-
                                              ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;        SEC. 353. PROJECT MODIFICATION AUTHORIZA-              ried out by the Secretary:
                                              114 Stat. 2763A–220; 119 Stat. 282; 119 Stat.                       TIONS.                                       (1) Modification of the project for flood
                                              2257; 122 Stat. 1623) is amended by striking              (a) WATER SUPPLY.—The following project              risk management, lower Mississippi River,
                                              ‘‘$75,000,000’’ and inserting ‘‘$130,000,000’’.         modifications for water supply, as identified          authorized by the Act of May 15, 1928 (chap-
                                                 (6) JACKSON COUNTY, MISSISSIPPI.—Section             in the report entitled ‘‘Report to Congress on         ter 569, 45 Stat. 534), to incorporate the Wolf
                                              219 of the Water Resources Development Act              Future Water Resources Development’’ dated             River Backwater and Nonconnah Creek levee
                                              of 1992 (106 Stat. 4835; 110 Stat. 3757; 113 Stat.      February 2019, and submitted to Congress on            systems into the project, authorized by sec-
                                              1494; 121 Stat. 1258) is amended—                       June 3, 2019, pursuant to section 7001 of the          tion 5 of the Act of June 22, 1936 (chapter 688,
                                                 (A) in subsection (c)(5), by striking ‘‘water        Water Resources Reform and Development                 49 Stat. 1575; 50 Stat. 881), subject to the de-
                                              supply and’’ and inserting ‘‘water supply,              Act of 2014 (33 U.S.C. 2282d) or otherwise re-         termination of the Secretary that such sys-
                                              projects for stormwater and drainage sys-               viewed by Congress, are authorized to be car-          tems meet all requirements applicable to
                                              tems, and’’; and                                        ried out by the Secretary substantially in             such project.
                                                 (B) in subsection (e)(1), by striking                accordance with the recommendations in-                  (2) Modification of the project for flood
                                              ‘‘$32,500,000’’ and inserting ‘‘$57,500,000’’.          cluded in such report pursuant to section              risk management, Red River below Denison
                                                 (7) ST. LOUIS, MISSOURI.—Section 219(f)(32)          301(c) of the Water Supply Act of 1958 (43             Dam, Arkansas, Louisiana, and Texas, au-
                                              of the Water Resources Development Act of               U.S.C. 390b(c)) and as follows:                        thorized by the Act of June 28, 1938 (chapter
                                              1992 (106 Stat. 4835; 113 Stat. 337; 121 Stat.            (1) CLARENCE CANNON DAM AND MARK TWAIN               795, 52 Stat. 1219), to incorporate the Cher-
                                              1233) is amended by striking ‘‘$35,000,000’’ and        LAKE PROJECT, SALT RIVER, MISSOURI.—                   okee Park Levee into the project, subject to
                                              inserting ‘‘$70,000,000’’.                                (A) IN GENERAL.—The project for Clarence             the determination of the Secretary that such
                                                 (8) MIDWEST CITY, OKLAHOMA.—Section                  Cannon Dam and Mark Twain Lake Project,                levee meets all requirements applicable to
                                              219(f)(231) of the Water Resources Develop-             Salt River, Missouri, authorized by section            such project.
                                              ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;        203 of the Flood Control Act of 1962 (76 Stat.         SEC. 354. COMPLETION OF MAINTENANCE AND
                                              121 Stat. 1266) is amended by striking                  1189; 79 Stat. 1089; 95 Stat. 1684), is modified                  REPAIR ACTIVITIES.
                                              ‘‘$2,000,000’’ and inserting ‘‘$5,000,000’’.            to release 5,600 acre-feet of future use water           (a) EXPEDITED COMPLETIONS.—
                                                 (9) SOUTH CENTRAL PENNSYLVANIA.—Section              supply storage to the Federal Government                 (1) UPPER SNAKE RIVER BASIN.—The Sec-
                                              313 of the Water Resources Development Act              under water supply contract No. DACW43–88–             retary shall expedite, in coordination with
                                              of 1992 (106 Stat. 4845; 109 Stat. 407; 110 Stat.       C–0036, and future financial obligations for           State, Tribal, and local authorities, the com-
                                              3723; 113 Stat. 310; 117 Stat. 142; 121 Stat. 1146)     such volume of storage.                                pletion of maintenance and repair activities
                                              is amended—                                               (B) RELIEF OF CERTAIN OBLIGATIONS.—Upon              for those elements of the levee systems in
                                                 (A) in subsection (g)(1), by striking                execution of the amendment required by sub-            the Upper Snake River Basin, authorized
                                              ‘‘$200,000,000’’ and inserting ‘‘$400,000,000’’;        paragraph (C), the State of Missouri shall be          pursuant to the Flood Control Act of 1950 (64
                                              and                                                     relieved of the obligation to pay the percent-         Stat. 179), that are operated and maintained
                                                 (B) in subsection (h)(2), by inserting ‘‘Bea-        age of the annual operation and maintenance            by the Secretary.
                                              ver, Jefferson,’’ after ‘‘Washington,’’.                expense, the percentage of major replace-                (2) LOWER MISSOURI RIVER BASIN.—The Sec-
                                                 (10) LAKES MARION AND MOULTRIE, SOUTH                ment cost, and the percentage of major reha-           retary shall expedite, in coordination with




SSpencer on DSK126QN23PROD with HOUSE
                                              CAROLINA.—Section 219(f)(25) of the Water               bilitation costs, of the joint use facilities of       State and local authorities and stakeholders,
                                              Resources Development Act of 1992 (106 Stat.            the project described in subparagraph (A),             the completion of maintenance and repair
                                              4835; 113 Stat. 336; 114 Stat. 2763A–220; 117           that are attributable to water supply storage          activities for those elements of the levee sys-
                                              Stat. 1838; 130 Stat. 1677; 132 Stat. 3818) is          space not being used by the State during the           tems in the Lower Missouri River Basin, au-
                                              amended by striking ‘‘$89,550,000’’ and insert-         period before the State commences use of               thorized pursuant to the Pick-Sloan Mis-
                                              ing ‘‘$110,000,000’’.                                   the storage space.                                     souri River Basin Program (authorized by
                                                 (11) EL PASO COUNTY, TEXAS.—Section                    (C) AMENDMENT TO CONTRACT.—The Sec-                  section 9(b) of the Act of December 22, 1944
                                              219(f)(269) of the Water Resources Develop-             retary shall amend Water Supply Contract               (chapter 665, 58 Stat. 891)) or the Missouri




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00059   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6966                                             CONGRESSIONAL RECORD — HOUSE                                                        December 8, 2020
                                              River Bank Stabilization and Navigation                 2016 (33 U.S.C. 2282e(d)) prior to carrying out          (1) IN GENERAL.—As soon as practicable,
                                              project (authorized by section 2 of the Act of          a project identified in subsection (a).                the Secretary shall complete the conveyance
                                              March 2, 1945 (chapter 19, 59 Stat. 19)), that          SEC. 356. CONVEYANCES.                                 of the Wilmington Harbor North Disposal
                                              are operated and maintained by the Sec-                   (a) GENERALLY APPLICABLE PROVISIONS.—                Area confined disposal facility, Delaware, to
                                              retary.                                                   (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—             the State of Delaware.
                                                (3) COOS BAY NORTH JETTY SYSTEM, OR-                  The exact acreage and the legal description              (2) DEED.—The Secretary shall convey the
                                              EGON.—The Secretary shall expedite, in co-              of any real property to be conveyed under              property under this subsection by quitclaim
                                              ordination with State and local authorities             this section shall be determined by a survey           deed under such terms and conditions as the
                                              and stakeholders, the completion of mainte-             that is satisfactory to the Secretary.                 Secretary determines appropriate to protect
                                              nance and repair activities for those ele-                (2) APPLICABILITY OF PROPERTY SCREENING              the interests of the United States.
                                              ments of the Coos Bay North Jetty system,               PROVISIONS.—Section 2696 of title 10, United             (3) CONSIDERATION.—The State of Delaware
                                              Oregon, authorized by the first section of the          States Code, shall not apply to any convey-            shall pay to the Secretary an amount that is
                                              Act of January 21, 1927 (chapter 47, 44 Stat.           ance under this section.                               not less than the fair market value of the
                                              1014), that are operated and maintained by                (3) COSTS OF CONVEYANCE.—An entity to                property conveyed under this subsection, as
                                              the Secretary.                                          which a conveyance is made under this sec-             determined by the Secretary.
                                                (4) INDIAN RIVER INLET AND BAY, DELA-                 tion shall be responsible for all reasonable             (e) OHIO RIVER LOCK AND DAM NUMBER 52,
                                              WARE.—The Secretary shall expedite, in co-              and necessary costs, including real estate             MASSAC COUNTY, ILLINOIS.—
                                              ordination with State and local authorities,            transaction and environmental documenta-                 (1) CONVEYANCE AUTHORIZED.—The Sec-
                                              the completion of maintenance and repair                tion costs, associated with the conveyance.            retary shall convey to the Massac-Metropolis
                                              activities for the elements of the project for            (4) LIABILITY.—An entity to which a con-             Port District, Illinois, all right, title, and in-
                                              navigation, Indian River Inlet and Bay, Dela-           veyance is made under this section shall hold          terest of the United States in and to any real
                                              ware, authorized by the Act of August 26,               the United States harmless from any liabil-            property located north of the south bank of
                                              1937 (chapter 832, 50 Stat. 846), that are oper-        ity with respect to activities carried out, on         the Ohio River in Massac County, Illinois,
                                              ated and maintained by the Secretary.                   or after the date of the conveyance, on the            that is associated with the Ohio River Lock
                                                (b) SAVINGS PROVISION.—Nothing in this                real property conveyed. The United States              and Dam 52.
                                              section affects the responsibility of the Sec-          shall remain responsible for any liability               (2) DEED.—The Secretary shall convey the
                                              retary to comply with the requirements of               with respect to activities carried out, before         property under this subsection by quitclaim
                                                                                                      such date, on the real property conveyed.              deed under such terms and conditions as the
                                              any Federal law in carrying out the activi-
                                                                                                        (5) ADDITIONAL TERMS AND CONDITIONS.—                Secretary determines appropriate to protect
                                              ties required to be expedited by this section.
                                                                                                      The Secretary may require that any convey-             the interests of the United States.
                                              SEC. 355. PROJECT REAUTHORIZATIONS.
                                                                                                      ance under this section be subject to such               (3) CONSIDERATION.—The Massac-Metropo-
                                                (a) IN GENERAL.—                                      additional terms and conditions as the Sec-            lis Port District, Illinois, shall pay to the
                                                (1) MUDDY RIVER, MASSACHUSETTS.—The                   retary considers necessary and appropriate             Secretary an amount that is not less than
                                              separable elements for ecosystem restora-               to protect the interests of the United States.         fair market value of the property conveyed
                                              tion of the project for flood damage reduc-               (b) EUFAULA, ALABAMA.—                               under this subsection, as determined by the
                                              tion and environmental restoration, Muddy                 (1) CONVEYANCE AUTHORIZED.—The Sec-                  Secretary.
                                              River, Brookline and Boston, Massachusetts,             retary shall convey to the City of Eufaula,              (f) UPPER ST. ANTHONY FALLS LOCK AND
                                              authorized by section 522 of the Water Re-              Alabama, all right, title, and interest of the         DAM, MINNEAPOLIS, MINNESOTA.—
                                              sources Development Act of 2000 (114 Stat.              United States in and to the real property de-            (1) CONVEYANCE AUTHORIZED.—As soon as
                                              2656), and deauthorized pursuant to section             scribed in the Department of the Army Lease            practicable after the date of enactment of
                                              6001 of the Water Resources Reform and De-              No. DACW01–2–17–0747, containing 56.76 acres,          this Act, the Secretary shall, upon request—
                                              velopment Act of 2014 (128 Stat. 1345), are au-         more or less, and being a part of Tracts L–              (A) convey, without consideration, to the
                                              thorized to be carried out by the Secretary,            1268 (26.12 acres), L–1273 (13.71 acres), L–1278       City of Minneapolis, Minnesota, or its des-
                                              subject to subsection (b).                              (6.75 acres), and L1279 (10.36 acres) of the           ignee, all or substantially all of the real
                                                (2) EAST CHESTER CREEK, NEW YORK.—Not-                Walter F. George Lock and Dam and Lake                 property owned by the United States adja-
                                              withstanding section 1001 of the Water Re-              project.                                               cent to or in the vicinity of the Upper St.
                                              sources Development Act of 1986 (33 U.S.C.                (2) DEED.—The Secretary shall convey the             Anthony Falls Lock and Dam, subject to the
                                              579a), the project for navigation, East Ches-           property under this subsection by quitclaim            right of the Secretary to retain any ease-
                                              ter Creek, New York, authorized by section              deed under such terms and conditions as the            ments in such property solely to the extent
                                              101 of the River and Harbor Act of 1950 (64             Secretary determines appropriate to protect            necessary to continue to operate and main-
                                              Stat. 164; 100 Stat. 4181), and deauthorized            the interests of the United States.                    tain the Upper St. Anthony Falls Lock and
                                              pursuant to section 1001 of the Water Re-                 (3) CONSIDERATION.—The City of Eufaula,              Dam; and
                                              sources Development Act of 1986 (33 U.S.C.              Alabama, shall pay to the Secretary an                   (B) provide, without consideration, to the
                                              579(a)), is authorized to be carried out by the         amount that is not less than the fair market           City or its designee—
                                              Secretary, subject to subsection (b).                   value of the property conveyed under this                (i) access and use rights by license, ease-
                                                (3) CHRISTIANSTED HARBOR, UNITED STATES               subsection, as determined by the Secretary.            ment, or similar agreement, to any real
                                              VIRGIN ISLANDS.—Notwithstanding section                   (c) MONTGOMERY, ALABAMA.—                            property and structures at the site of the
                                              1002 of the Water Resources Development                   (1) CONVEYANCE AUTHORIZED.—The Sec-                  Upper St. Anthony Falls Lock and Dam that
                                              Act of 1986 (100 Stat. 4221), the portion of the        retary shall convey to the City of Mont-               is not conveyed under subparagraph (A); and
                                              project for navigation, Christiansted Harbor,           gomery, Alabama, all right, title, and inter-            (ii) for any such property retained by the
                                              St. Croix, United States Virgin Islands, au-            est of the United States in and to the real            Secretary, exclusive license or easement
                                              thorized by section 101 of the River and Har-           property described in paragraph (2).                   over such property to allow the City or its
                                              bor Act of 1950 (64 Stat. 167), and deauthor-             (2) PROPERTY.—The property to be con-                designee to construct, use, and operate
                                              ized under section 1002 of the Water Re-                veyed is the 62.38 acres of land and water             amenities thereon, and to utilize such prop-
                                              sources Development Act of 1986 (100 Stat.              under the primary jurisdiction of the Sec-             erty as a comprehensive recreational,
                                              4221), is authorized to be carried out by the           retary in the R.E. ‘‘Bob’’ Woodruff Project            touristic, and interpretive experience.
                                              Secretary, subject to subsection (b).                   Area that is covered by lease number                     (2) OWNERSHIP AND OPERATION OF LOCK AND
                                                (4) CHARLOTTE AMALIE (ST. THOMAS) HARBOR,             DACW01–1–05–0037, including the parcels and            DAM.—Ownership rights to the Upper St. An-
                                              UNITED STATES VIRGIN ISLANDS.—Notwith-                  structure known as ‘‘Powder Magazine’’.                thony Falls Lock and Dam shall not be con-
                                              standing section 1002 of the Water Resources              (3) DEADLINE.—To the extent practicable,             veyed under this subsection, and the Sec-
                                              Development Act of 1986 (100 Stat. 4221), the           the Secretary shall complete the conveyance            retary shall retain all rights to operate and
                                              portion of the project for navigation, Char-            under this subsection by not later than 180            maintain the Upper St. Anthony Falls Lock
                                              lotte Amalie (St. Thomas) Harbor, St. Thom-             days after the date of enactment of this Act.          and Dam.
                                              as, United States Virgin Islands, authorized              (4) DEED.—The Secretary shall convey the               (3) REVERSION.—If the Secretary deter-
                                              by the Act of August 26, 1937 (chapter 832, 50          property under this subsection by quitclaim            mines that the property conveyed under this
                                              Stat. 850), and deauthorized under section              deed under such terms and conditions as the            subsection is not used for a public purpose,
                                              1002 of the Water Resources Development                 Secretary determines appropriate to protect            all right, title, and interest in and to the
                                              Act of 1986 (100 Stat. 4221), is authorized to be       the interests of the United States, to include         property shall revert, at the discretion of the
                                              carried out by the Secretary, subject to sub-           retaining the right to inundate with water             Secretary, to the United States.
                                              section (b).                                            any land transferred under this subsection.              (4) UPPER ST. ANTHONY FALLS LOCK AND DAM




SSpencer on DSK126QN23PROD with HOUSE
                                                (b) REPORT TO CONGRESS.—The Secretary                   (5) CONSIDERATION.—The City of Mont-                 DEFINED.—In     this subsection, the term
                                              shall complete and submit to the Committee              gomery, Alabama, shall pay to the Secretary            ‘‘Upper St. Anthony Falls Lock and Dam’’
                                              on Transportation and Infrastructure of the             an amount that is not less than the fair mar-          means the lock and dam located on Mis-
                                              House of Representatives and the Committee              ket value of the property conveyed under               sissippi River Mile 853.9 in Minneapolis, Min-
                                              on Environment and Public Works of the                  this subsection, as determined by the Sec-             nesota.
                                              Senate a post-authorization change report               retary.                                                  (g) CLINTON, MISSOURI.—
                                              (as such term is defined in section 1132(d) of            (d) CONVEYANCE OF WILMINGTON HARBOR                    (1) CONVEYANCE AUTHORIZED.—The Sec-
                                              the Water Resources Development Act of                  NORTH DISPOSAL AREA, DELAWARE.—                        retary shall convey to the City of Clinton,




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00060   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                     H6967
                                              Missouri, without consideration, all right,               (3) DEED.—The Secretary shall convey the               (1) NON-FEDERAL ENTITY.—In this sub-
                                              title, and interest of the United States in             property under this subsection by quitclaim            section, the term ‘‘non-Federal entity’’
                                              and to the real property described in para-             deed under such terms and conditions as the            means the Friends of Joseph Barker, Jr.,
                                              graph (2).                                              Secretary determines appropriate to protect            House, a nonprofit organization in the State
                                                (2) PROPERTY.—The property to be con-                 the interests of the United States.                    of Ohio.
                                              veyed is a tract of land situated in the S 1⁄2            (4) REVERSION.—If the Secretary deter-                 (2) CONVEYANCE AUTHORIZED.—
                                              of Section 12 and the N 1⁄2 of Section 13,              mines that the property conveyed under this              (A) IN GENERAL.—Subject to paragraph (6),
                                              Township 41 North, Range 26 West of the                 subsection is not being used for a public pur-         the Secretary shall convey to the non-Fed-
                                              Fifth Principal Meridian, Henry County,                 pose, all right, title, and interest in and to         eral entity, without consideration, all right,
                                              Missouri, more particularly described as fol-           the property shall revert, at the discretion of        title, and interest of the United States in
                                              lows: Beginning at the point of intersection            the Secretary, to the United States.                   and to the property described in paragraph
                                              of the north line of said S 1⁄2 of Section 12             (h) CITY OF CLINTON, OLD ORCHARD ADDI-               (3)(A).
                                              and the easterly right-of-way of State High-            TION, MISSOURI.—                                         (B) EASEMENT.—Upon conveyance of the
                                              way No. 13; thence easterly along the north               (1) CONVEYANCE AUTHORIZED.—The Sec-                  property under subparagraph (A), the Sec-
                                              line of said S 1⁄2 to the northeast corner of           retary shall convey to the City of Clinton,            retary shall provide to the non-Federal enti-
                                              the W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 of said Section          Missouri, all right, title, and interest of the        ty, without consideration, an easement over
                                              12; thence southerly along the east line of             United States in and to the real property de-          the property described in paragraph (3)(B) for
                                              said W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 to the southeast        scribed in paragraph (2).                              access to the conveyed property for as long
                                                                                                        (2) PROPERTY.—The property to be con-                as the non-Federal entity is in legal posses-
                                              corner thereof; thence easterly along the
                                                                                                      veyed is Lot 28 in Old Orchard Addition, a             sion of the conveyed property.
                                              north line of the S 1⁄2 NE 1⁄4 SW 1⁄4 of said Sec-
                                                                                                      subdivision of the City of Clinton, Henry                (3) DESCRIPTIONS OF PROPERTY.—
                                              tion 12 to the southwest corner of the W 1⁄2
                                                                                                      County, Missouri, containing 0.36 acres,                 (A) IN GENERAL.—The property referred to
                                              NW 1⁄4 NW 1⁄4 SE 1⁄4 of said Section 12; thence
                                                                                                      more or less, including any improvements               in paragraph (2)(A) is the following (as in ex-
                                              in a northeasterly direction to the northeast
                                                                                                      thereon.                                               istence on the date of enactment of this
                                              corner of said W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 ;
                                                                                                        (3) DEED.—The Secretary shall convey the             Act):
                                              thence easterly along the north line of said
                                                                                                      property under this subsection by quitclaim              (i) JUDGE JOSEPH BARKER, JR., HOUSE.—The
                                              S 1⁄2 to the westerly right-of-way of the                                                                      tract of land situated in the State of Ohio,
                                              County Road; thence in a southeasterly and              deed under such terms and conditions as the
                                                                                                      Secretary determines appropriate to protect            Washington County, on the Ohio River, and
                                              southerly direction along the westerly right-                                                                  being particularly bounded and described as
                                              of-way of said County Road approximately                the interests of the United States, including
                                                                                                                                                             follows: Beginning at a point located on the
                                              2500 feet to the center of Deer Creek; thence           such reservations, terms, and conditions as
                                                                                                                                                             southern right-of-way line of Ohio Route 7, a
                                              in a southwesterly direction along the center           the Secretary determines necessary to allow
                                                                                                                                                             new corner to the land now or formerly
                                              of said Deer Creek, approximately 3900 feet             the United States to operate and maintain
                                                                                                                                                             owned by the United States of America;
                                              to the south line of said N 1⁄2 of Section 13;          the Harry S. Truman Reservoir Project.
                                                                                                                                                             thence, leaving the right-of-way of said
                                              thence westerly along the south line of said              (4) CONSIDERATION.—The City of Clinton,
                                                                                                                                                             Route 7 and severing the land of said United
                                              N 1⁄2 to the easterly right-of-way line of the          Missouri, shall pay to the Secretary an
                                                                                                                                                             States of America parallel to and approxi-
                                              St. Louis-San Francisco Railroad; thence in             amount that is not less than the fair market
                                                                                                                                                             mately 10 feet easterly of the toe of the ex-
                                              a northwesterly direction along the easterly            value of the property conveyed under this
                                                                                                                                                             isting dredge disposal berm, southeasterly
                                              right-of-way of said railroad to the easterly           subsection, as determined by the Secretary.
                                                                                                                                                             approximately 326 feet to a point prior to the
                                              right-of-way of said State Highway No. 13;                (i) TRI-COUNTY LEVEE DISTRICT, MIS-                  current Corps of Engineers access to the
                                              thence in a northeasterly direction along the           SOURI.—                                                dredging spoil area; thence, northeasterly
                                              easterly right-of-way of said State Highway               (1) CONVEYANCE AUTHORIZED.—The Sec-                  approximately 480 feet paralleling the top of
                                              No. 13 to the point of the beginning; and in-           retary shall convey to the Tri-County Levee            the slope to the riverbank side of the house
                                              cluding a roadway easement for ingress and              District, Missouri, all right, title, and inter-       and approximately 25 feet northerly there-
                                              egress, described as a strip of land 80 feet in         est of the United States in and to the real            from; thence, northwest approximately 302
                                              width, lying 40 feet on each side of the fol-           property described in paragraph (2).                   feet to a point in the southern right-of-way
                                              lowing described line, the initial extremities            (2) PROPERTY.—The property to be con-                of Ohio Route 7; thence with the right-of-
                                              of the following described strip being ex-              veyed is the part of Sections 1 and 12 Town-           way of said Route 7, southwesterly approxi-
                                              tended or reduced as required to exactly ad-            ship 45 North Range 6 West of the 5th P.M. in          mately 485 feet to the point of beginning,
                                              join the boundary lines which they meet, sit-           Montgomery County, Missouri, described as              containing approximately 3.51 acres.
                                              uated in the S 1⁄2 of Section 12, Township 41           follows: A tract of land being 60’ wide and              (ii) ROAD TRACT.—The tract of land situ-
                                              North Range 26 West of the Fifth Principal              lying South and East of and adjoining the              ated in the State of Ohio, Washington Coun-
                                              Meridian, Henry County, Missouri, more par-             centerline of the existing levee and being de-         ty, on the Ohio River, and being particularly
                                              ticularly described as follows: Commencing              scribed as follows: Commencing at the NW               bounded and described as follows: Beginning
                                              at the center of said Section 12, thence                corner of Section 12, thence S 87° 52’ 35’’ E          at a point located on the southern right-of-
                                              Sl°24’56’’W, 1265.52 feet to a point, thence            587.4’, thence S 01° 29’ 25’’ W 453.68’ to the         way line of Ohio Route 7, a new corner to the
                                              N88°29’02’’W, 483.97 feet to the point of begin-        point of the beginning; said point being in            land now or formerly owned by the United
                                              ning of the strip of land herein described;             the center of the levee, thence with the cen-          States of America; thence, leaving the right-
                                              thence in a northeasterly direction along a             terline of the levee N 77° 01’ 30’’ E 164.92’,         of-way of said Route 7 and severing the land
                                              curve to the right, said curve having an ini-           thence N 74° 26’ 55’’ E 250.0’, thence N 72° 27’       of said United States of America and with
                                              tial tangent bearing of N3°44’4l’’E, a radius of        55’’ E 270.0’, thence N 69° 06’ 10’’ E 300.0’,         the House Parcel southeasterly 25 feet;
                                              238.73 feet and an interior angle of 61°29’26’’,        thence N 66° 42’ 15’’ E 500.0’, thence N 64° 14’       thence, northeast, running parallel to said
                                              an arc distance of 256.21 feet to a point;              30’’ E 270.0’, thence N 61° 09’ 10’’ E 800.0’,         Route 7 right-of-way, approximately 994 feet
                                              thence N65°14’07’’E 218.58 feet to a point;             thence N 60° 58’ 15’’ E 1724.45’, thence leaving       to a point of deflection; thence northeasterly
                                              thence in a northeasterly direction along a             the centerline S 01° 10’ 35’’ W 69.43’, thence         368 feet to a point beyond the existing fence
                                              curve to the left, having a radius of 674.07            parallel with the above described centerline           corner; thence, east 140 feet to the edge of
                                              feet and an interior angle of 36°00’01’’, an arc        S 60° 58’ 15’’ W 1689.62’, thence S 61° 09’ 10’’ W     the existing Willow Island access road;
                                              distance of 423.53 feet to a point; thence              801.71’, thence S 64° 14’ 30’’ W 272.91’, thence       thence with said access road, northwesterly
                                              N29°14’07’’E, 417.87 feet to a point; thence            S 66° 42’ 15’’ W 502.55’, thence S 69° 06’ 10’’ W      approximately 62 feet to a point in the
                                              northeasterly along a curve to the right,               303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S      southern right-of-way of Ohio Route 7;
                                              having a radius of 818.51 feet and an interior          74° 26’ 55’’ W 252.39’, thence S 77° 01’ 30’’ W        thence with the right-of-way of said Route 7,
                                              angle of 14°30’01’’, an arc distance of 207.15          181.75’, thence leaving the South side of the          southwesterly approximately 1,491 feet to
                                              feet to a point; thence N43°44’07’’E, 57.00 feet        levee N 01° 26’ 25’’ E 61.96’ to the point of be-      the point of beginning, containing approxi-
                                              to the southerly right-of-way line of a coun-           ginning and containing 5.89 acres more or              mately 1 acre.
                                              ty road, containing 2,948 acres, more or less;          less.                                                    (B) EASEMENT.—The property referred to in
                                              Excluding therefrom a tract of land situated              (3) DEED.—The Secretary shall convey the             paragraph (2)(B) is the following: The tract
                                              in the S 1⁄2 of said Section 12, said Township          property under this subsection by quitclaim            of land situated in the State of Ohio, Wash-
                                              and Range, described as commencing at the               deed under such terms and conditions as the            ington County, on the Ohio River, and being
                                              center of said Section 12; thence S1°24’56’’W,          Secretary determines appropriate to protect            particularly bounded and described as fol-
                                              1265.52 feet to the point of beginning of the           the interests of the United States.                    lows: Beginning at a point at the intersec-




SSpencer on DSK126QN23PROD with HOUSE
                                              tract of land herein described; thence                    (4) CONSIDERATION.—The Tri-County Levee              tion of the southern right-of-way of Ohio
                                              N88°29’02’’W, 1122.50 feet; thence S1°43’26’’W,         District, Missouri, shall pay to the Secretary         Route 7 and the northeast side of the exist-
                                              872.62 feet; thence S88°29’02’’E, 1337.36 feet;         an amount that is not less than the fair mar-          ing Willow Island access road, a new corner
                                              thence     Nl°43’26’’E,   872.62   feet;   thence       ket value of the property conveyed under               to the land now or formerly owned by the
                                              N88°29’02’’W, 214.86 feet to the point of begin-        this subsection, as determined by the Sec-             United States of America; thence, southwest,
                                              ning, containing 26.79 acres, more or less.             retary.                                                running with said Route 7 right-of-way, ap-
                                              The above described tract contains, in the                (j) JUDGE JOSEPH BARKER, JR., HOUSE,                 proximately 30 feet to a point on the south-
                                              aggregate, 177.69 acres, more or less.                  OHIO.—                                                 west side of the existing access road, and




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00061   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6968                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                              corner to the road tract; thence with said ac-             (A) section 306101 of title 54, United States       ing entity, without consideration, all right,
                                              cess road and the line of the road parcel,              Code; and                                              title, and interest of the United States in
                                              southeasterly approximately 62 feet to a                   (B) section 306108 of title 54, United States       and to any land in which the Federal Gov-
                                              point; thence leaving the road parcel and               Code, with respect to the effects on the prop-         ernment has a property interest for the Wil-
                                              crossing the existing access road northeast-            erty of dredged material placement activi-             lamette Falls Locks project, together with
                                              erly approximately 30 feet to a point located           ties carried out by the Secretary after the            any improvements on the land, subject to
                                              on the northeast side of the existing access            date of the conveyances.                               the requirements of this subsection and in
                                              road; thence, northwesterly approximately                  (9) INAPPLICABILITY.—Subtitle I of title 40,        accordance with the Willamette Falls Locks
                                              62 feet, to the point of beginning, containing          and chapter 4 of title 41, United States Code          report.
                                              approximately 0.04 acre.                                shall not apply to any conveyance or ease-               (3) DEED.—The Secretary shall convey the
                                                 (4) DEED.—The Secretary shall convey the             ment provided under this subsection.                   property under this subsection by quitclaim
                                              property under this subsection by quitclaim                (k) LEABURG FISH HATCHERY, LANE COUNTY,             deed under such terms and conditions as the
                                              deed under such terms and conditions as the             OREGON.—                                               Secretary determines appropriate to protect
                                              Secretary determines appropriate to protect                (1) CONVEYANCE AUTHORIZED.—Subject to               the interests of the United States.
                                                                                                      the provisions of this subsection, the Sec-              (4) SUBJECT TO EXISTING EASEMENTS AND
                                              the interests of the United States.
                                                                                                      retary shall convey, without consideration,            OTHER INTERESTS.—The conveyance of prop-
                                                 (5) REVERSION.—If the Secretary deter-
                                                                                                      to the State of Oregon, acting through the             erty under paragraph (2) shall be subject to
                                              mines that the property conveyed under this
                                                                                                      Oregon Department of Fish and Wildlife, all            all existing deed reservations, easements,
                                              subsection is not being used by the non-Fed-
                                                                                                      right, title, and interest of the United States        rights-of-way, and leases that are in effect as
                                              eral entity for a public purpose, all right,
                                                                                                      in and to the real property comprising the             of the date of the conveyance.
                                              title, and interest in and to the property              Leaburg Fish Hatchery, consisting of ap-
                                              shall revert, at the discretion of the Sec-                                                                      (5) REVERSION.—If the Secretary deter-
                                                                                                      proximately 21.55 acres, identified as tracts          mines that the property conveyed under this
                                              retary, to the United States.                           Q–1500, Q–1501E, and 300E–1 and described in
                                                 (6) REQUIREMENTS.—                                                                                          subsection cease to be held in public owner-
                                                                                                      Department of the Army Lease No. DACW57–               ship, all right, title, and interest in and to
                                                 (A) IMPROVEMENTS.—The Secretary shall                1–18–0009, together with any improvements
                                              make such improvements and alterations to                                                                      the property shall revert, at the discretion of
                                                                                                      on the property.                                       the Secretary, to the United States.
                                              the property described in paragraph (3)(A)(i)              (2) WATER RIGHTS.—The Secretary may
                                              as the Secretary, in consultation with the                                                                       (6) REQUIREMENTS BEFORE CONVEYANCE.—
                                                                                                      transfer to the State of Oregon, acting
                                              non-Federal entity and relevant stake-                                                                           (A) PERPETUAL ROAD EASEMENT.—Before
                                                                                                      through the Oregon Department of Fish and
                                              holders, determines to be appropriate to fa-                                                                   making the conveyance under paragraph (2),
                                                                                                      Wildlife, any water rights held by the United
                                              cilitate conveyance of the property and pro-                                                                   the Secretary shall acquire a perpetual road
                                                                                                      States that are appurtenant to the property
                                              vision of the easement under this subsection,                                                                  easement from an adjacent property owner
                                                                                                      conveyed under this subsection.
                                              subject to the condition that the total cost                                                                   for use of an access road, which easement
                                                                                                         (3) DEED.—The Secretary shall convey the
                                              of those improvements and alterations un-                                                                      shall convey with the property conveyed
                                                                                                      property under this subsection by quitclaim
                                              dertaken by the Secretary shall be not more                                                                    under such paragraph.
                                                                                                      deed under such terms and conditions as the
                                              than $120,000.                                                                                                   (B) ENVIRONMENTAL COMPLIANCE.—Before
                                                                                                      Secretary determines appropriate to protect
                                                 (B) ENVIRONMENTAL ASSESSMENT.—Before                                                                        making the conveyance under paragraph (2),
                                                                                                      the interests of the United States, including
                                              making a conveyance under paragraph (2),                                                                       in accordance with the real estate appendix,
                                                                                                      a condition that all of the property conveyed
                                              the Secretary shall—                                    under this subsection be used and main-                the Secretary shall complete a Phase 1 Envi-
                                                 (i) conduct, with respect to the property to         tained by the State of Oregon for the purpose          ronmental Site Assessment pursuant to the
                                              be conveyed, an assessment of the environ-              of operating a fish hatchery in perpetuity.            Comprehensive Environmental Response,
                                              mental condition of the property, including                (4) REVERSION.—If the Secretary deter-              Compensation, and Liability Act of 1980 (42
                                              an investigation of any potential hazardous,            mines that the property conveyed under this            U.S.C. 9601 et seq.).
                                              toxic, or radioactive waste present on such             subsection is not being used or maintained               (C) HISTORIC PRESERVATION.—The Sec-
                                              property; and                                           by the State of Oregon for the purpose of op-          retary may enter into a memorandum of
                                                 (ii) submit to the non-Federal entity a re-          erating a fish hatchery in perpetuity, all or          agreement with the Oregon State Historic
                                              port describing the results of such assess-             any portion of the property, including any             Preservation Office and the Advisory Council
                                              ment.                                                   water rights transferred under this sub-               on Historic Preservation that identifies ac-
                                                 (C) REFUSAL BY NON-FEDERAL ENTITY.—                  section, shall, at the option of the Secretary,        tions the Secretary shall take before making
                                                 (i) IN GENERAL.—Upon review by the non-              revert to the United States.                           the conveyance under paragraph (2).
                                              Federal entity of the report under subpara-                (5) SAVINGS CLAUSE.—If the State of Oregon            (D) REPAIRS.—Before making the convey-
                                              graph (B), the non-Federal entity may elect             does not accept the conveyance under this              ance under paragraph (2), the Secretary shall
                                              to refuse the conveyance under this sub-                subsection, the Secretary may dispose of the           carry out repairs to address primary seismic
                                              section.                                                property,     including    appurtenant     water       and safety risks in accordance with the rec-
                                                 (ii) ELECTION.—An election under clause              rights, under subchapter III of chapter 5 of           ommendations approved in the Willamette
                                              (i)—                                                    title 40, United States Code.                          Falls Locks report.
                                                 (I) shall be at the sole discretion of the              (l) WILLAMETTE FALLS LOCKS, WILLAMETTE                (7) DEAUTHORIZATION.—Beginning on the
                                              non-Federal entity; and                                 RIVER, OREGON.—                                        date on which the Secretary makes the con-
                                                 (II) shall be made by the non-Federal enti-             (1) DEFINITIONS.—In this section:                   veyance under paragraph (2), the Willamette
                                              ty by not later than the date that is 30 days              (A) REAL ESTATE APPENDIX.—The term                  Falls Locks project is no longer authorized.
                                              after the date of submission of the report              ‘‘real estate appendix’’ means Appendix A of           SEC. 357. LAKE EUFAULA ADVISORY COMMITTEE.
                                              under subparagraph (B)(ii).                             the document published by the District Com-              Section 3133(b) of the Water Resources De-
                                                 (D) DREDGED MATERIAL PLACEMENT ACTIVI-               mander of the Portland District of the Corps           velopment Act of 2007 (121 Stat. 1141) is
                                              TIES.—The Secretary shall—                              of Engineers, titled ‘‘Willamette Falls Locks          amended by adding at the end the following:
                                                 (i) notify and coordinate with the non-Fed-          Willamette River Oregon Section 216 Dis-                 ‘‘(5) TERMINATION.—The committee shall
                                              eral entity and relevant stakeholders before            position Study with Integrated Environ-                terminate on the date that is 30 days after
                                              carrying out any dredged material place-                mental Assessment’’.                                   the date on which the committee submits
                                              ment activities associated with the property               (B) RECEIVING ENTITY.—The term ‘‘receiv-            final recommendations to the Secretary.’’.
                                              described in paragraph (3)(A) after the date            ing entity’’ means an entity identified by the
                                              on which such property is conveyed under                State of Oregon, in consultation with the              SEC. 358. REPEAL OF MISSOURI RIVER TASK
                                                                                                                                                                        FORCE, NORTH DAKOTA.
                                              this subsection; and                                    Willamette Falls Locks Commission, to re-
                                                 (ii) in carrying out a dredged material              ceive the conveyance under paragraph (2).                (a) IN GENERAL.—Section 705 of the Water
                                              placement activity under clause (i), act in                (C) WILLAMETTE FALLS LOCKS PROJECT.—                Resources Development Act of 2000 (114 Stat.
                                              accordance with Engineer Manual EM 1110–2–              The term ‘‘Willamette Falls Locks project’’            2696) is repealed.
                                              5025 (or a subsequent version of that man-              means the project for navigation, Willamette             (b) CONFORMING AMENDMENTS.—
                                              ual).                                                   Falls Locks, Willamette River, Oregon, au-               (1) PURPOSES.—Section 702(b)(3) of the
                                                 (7) RESERVATION OF RIGHTS.—The Secretary             thorized by the Act of June 25, 1910 (36 Stat.         Water Resources Development Act of 2000
                                              may reserve and retain from any conveyance              664, chapter 382).                                     (114 Stat. 2695) is amended by inserting ‘‘pre-
                                              under this subsection a right-of-way or any                (D) WILLAMETTE FALLS LOCKS REPORT.—The              pared under section 705(e) (as in effect on the
                                              other right that the Secretary determines to            term ‘‘Willamette Falls Locks report’’                 day before the date of enactment of the




SSpencer on DSK126QN23PROD with HOUSE
                                              be necessary for the operation and mainte-              means the memorandum of the Director of                Water Resources Development Act of 2020)’’
                                              nance of the authorized Federal channel                 Civil Works with the subject ‘‘Willamette              before the period at the end.
                                              along the Ohio River.                                   Falls Locks (WFL), Willamette River Oregon               (2) DEFINITIONS.—Section 703 of the Water
                                                 (8) TREATMENT.—Conveyance to the non-                Section 216 Disposition Study with Inte-               Resources Development Act of 2000 (114 Stat.
                                              Federal entity under this subsection of prop-           grated Environmental Assessment (Study)’’,             2695) is amended—
                                              erty described in paragraph (3)(A)(i) shall             dated July 11, 2019.                                     (A) by striking paragraphs (2) and (4); and
                                              satisfy all obligations of the Secretary with              (2) CONVEYANCE AUTHORIZED.—The Sec-                   (B) by redesignating paragraphs (3) and (5)
                                              respect to such property under—                         retary is authorized to convey to the receiv-          as paragraphs (2) and (3), respectively.




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00062   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6969
                                              SEC. 359. REPEAL OF MISSOURI RIVER TASK                   (1) in subsection (b), by striking paragraph         the item relating to such section in the table
                                                         FORCE, SOUTH DAKOTA.                         (2) and redesignating paragraph (3) as para-           of contents, are repealed.
                                                (a) IN GENERAL.—Section 905 of the Water              graph (2); and                                           (g) Section 1301 of the Water Resources De-
                                              Resources Development Act of 2000 (114 Stat.              (2) by striking subsection (c).                      velopment Act of 2018 (33 U.S.C. 579d–1), and
                                              2709) is repealed.                                        (c) Section 1001 of the Water Resources Re-          the item relating to such section in the table
                                                                                                      form and Development Act of 2014 (33 U.S.C.            of contents, are repealed.
                                                (b) CONFORMING AMENDMENTS.—
                                                                                                      2282c) is amended—
                                                (1) PURPOSES.—Section 902(b)(3) of the                                                                         (h) Section 1302 of the Water Resources De-
                                                                                                        (1) in subsection (d)—
                                              Water Resources Development Act of 2000                                                                        velopment Act of 2018 (33 U.S.C. 579c–2), and
                                                                                                        (A) in paragraph (1), by striking ‘‘Notwith-
                                              (114 Stat. 2708) is amended by inserting ‘‘pre-                                                                the item relating to such section in the table
                                                                                                      standing the requirements of subsection (c),
                                              pared under section 905(e) (as in effect on the                                                                of contents, are repealed.
                                                                                                      the Secretary’’ and inserting ‘‘The Sec-
                                              day before the date of enactment of the                 retary’’;                                                        TITLE IV—WATER RESOURCES
                                              Water Resources Development Act of 2020)’’                (B) by striking ‘‘subsections (a) and (c)’’                         INFRASTRUCTURE
                                              before the period at the end.                           each place it appears and inserting ‘‘sub-
                                                (2) DEFINITIONS.—Section 903 of the Water                                                                    SEC. 401. PROJECT AUTHORIZATIONS.
                                                                                                      section (a)’’; and
                                              Resources Development Act of 2000 (114 Stat.                                                                     The following projects for water resources
                                                                                                        (C) by striking paragraph (4); and
                                              2708) is amended—                                                                                              development and conservation and other pur-
                                                                                                        (2) by striking subsection (c) and redesig-
                                                (A) by striking paragraphs (2) and (4); and                                                                  poses, as identified in the reports titled ‘‘Re-
                                                                                                      nating subsections (d) through (g) as sub-
                                                (B) by redesignating paragraphs (3) and (5)                                                                  port to Congress on Future Water Resources
                                                                                                      sections (c) through (f), respectively.
                                              as paragraphs (2) and (3), respectively.                  (d) Section 6003 of the Water Resources Re-          Development’’ submitted to Congress pursu-
                                              SEC. 360. CONFORMING AMENDMENTS.                        form and Development Act of 2014 (33 U.S.C.            ant to section 7001 of the Water Resources
                                                                                                      579c), and the item relating to such section           Reform and Development Act of 2014 (33
                                                (a) Section 710 of the Water Resources De-                                                                   U.S.C. 2282d) or otherwise reviewed by Con-
                                                                                                      in the table of contents, are repealed.
                                              velopment Act of 1986 (33 U.S.C. 2264), and               (e) Section 1301 of the Water Resources De-          gress, are authorized to be carried out by the
                                              the item relating to such section in the table          velopment Act of 2016 (33 U.S.C. 579d), and            Secretary substantially in accordance with
                                              of contents, are repealed.                              the item relating to such section in the table         the plans, and subject to the conditions, de-
                                                (b) Section 1001 of the Water Resources De-           of contents, are repealed.                             scribed in the respective reports or decision
                                              velopment Act of 1986 (33 U.S.C. 579a) is                 (f) Section 1302 of the Water Resources De-          documents designated in this section:
                                              amended—                                                velopment Act of 2016 (33 U.S.C. 579c–1), and            (1) NAVIGATION.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               1. AK             Port of Nome Modifications                   May 29, 2020                     Federal: $378,908,000
                                                                                                                                               Non-Federal: $126,325,000
                                                                                                                                               Total: $505,233,000

                                               2. AK             St. George Harbor Improvement,               August 13, 2020                  Federal: $147,874,000
                                                                   St. George                                                                  Non-Federal: $16,508,000
                                                                                                                                               Total: $164,382,000

                                               3. AK             Unalaska (Dutch Harbor) Channels             February 7, 2020                 Federal: $26,967,000
                                                                                                                                               Non-Federal: $8,989,000
                                                                                                                                               Total: $35,956,000

                                               4. CT             New Haven Harbor Navigation Im-              May 7, 2020                      Federal: $55,250,000
                                                                  provement Project                                                            Non-Federal: $19,442,000
                                                                                                                                               Total: $74,692,000

                                               5. NY, NJ         New York and New Jersey Harbor               April 23, 2020                   Federal: $19,550,000
                                                                  Anchorages                                                                   Non-Federal: $6,520,000
                                                                                                                                               Total: $26,070,000

                                               6. TX             Gulf Intracoastal Waterway, Brazos           October 23, 2019                 Total: $414,144,000
                                                                  River Floodgates and Colorado
                                                                  River Locks

                                               7. TX             Houston Ship Channel Expansion               April 23, 2020                   Federal: $625,204,000
                                                                  Channel Improvement Project,                                                 Non-Federal: $260,431,000
                                                                  Harris, Chambers, and Galveston                                              Total: $885,635,000
                                                                  Counties

                                               8. TX             Matagorda Ship Channel Improve-              November 15, 2019                Federal: $140,156,000
                                                                  ment Project, Port Lavaca                                                    Non-Federal: $80,500,000
                                                                                                                                               Total: $220,656,000

                                               9. VA             Atlantic Intracoastal Waterway,              August 25, 2020                  Federal: $102,755,000
                                                                  North Landing Bridge Replace-                                                Non-Federal: $0
                                                                  ment                                                                         Total: $102,755,000


                                                (2) FLOOD RISK MANAGEMENT.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               1. AZ             Little Colorado River at Winslow,            December 14, 2018                Federal: $54,260,000




SSpencer on DSK126QN23PROD with HOUSE
                                                                   Navajo County                                                               Non-Federal: $29,217,000
                                                                                                                                               Total: $83,477,000

                                               2. CA             Westminster, East Garden Grove,              July 9, 2020                     Federal: $324,905,000
                                                                  California Flood Risk Manage-                                                Non-Federal: $940,191,000
                                                                  ment                                                                         Total: $1,265,096,000




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00063   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013    H08DEPT1
                                              H6970                                              CONGRESSIONAL RECORD — HOUSE                                                         December 8, 2020
                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               3. CT, NY         Westchester   County    Streams,              May 7, 2020                     Federal: $15,199,000
                                                                  Byram River Basin, Fairfield                                                 Non-Federal: $15,199,000
                                                                  County, Connecticut, and West-                                               Total: $30,397,000
                                                                  chester County, New York

                                               4. KY             Louisville Metropolitan Flood Pro-            October 27, 2020                Federal: $122,170,000
                                                                  tection System Reconstruction,                                               Non-Federal: $65,917,000
                                                                  Jefferson and Bullitt Counties                                               Total: $188,087,000

                                               5. ND             Souris River Basin             Flood   Risk   April 16, 2019                  Federal: $59,582,915
                                                                  Management                                                                   Non-Federal: $32,364,085
                                                                                                                                               Total: $91,947,000

                                               6. NJ             Peckman River Basin                           April 29, 2020                  Federal: $98,137,000
                                                                                                                                               Non-Federal: $52,843,000
                                                                                                                                               Total: $150,980,000

                                               7. NM             Middle Rio Grande Flood Protec-               March 13, 2020                  Federal: $201,944,451
                                                                  tion, Bernalillo to Belen                                                    Non-Federal: $108,740,000
                                                                                                                                               Total: $310,684,000

                                               8. OK             Tulsa and West-Tulsa Levee Sys-               April 23, 2020                  Federal: $89,311,000
                                                                  tem, Tulsa County                                                            Non-Federal: $48,091,000
                                                                                                                                               Total: $137,402,000

                                               9. PR             Rio Culebrinas at Aguiadilla and              August 17, 2020                 Federal: $17,295,600
                                                                  Aguada                                                                       Non-Federal: $8,568,400
                                                                                                                                               Total: $25,864,000

                                               10. PR            Rio Guayanilla Flood Risk Manage-             August 13, 2020                 Federal: $103,422,000
                                                                  ment, Guayanilla                                                             Non-Federal: $55,689,000
                                                                                                                                               Total: $159,111,000

                                               11. PR            Rio Grande de Manati Flood Risk               November 18, 2020               Federal: $9,770,000
                                                                  Management, Ciales                                                           Non-Federal: $4,520,000
                                                                                                                                               Total: $14,290,000

                                               12. USVI          Savan Gut, St. Thomas                         August 24, 2020                 Federal: $48,658,100
                                                                                                                                               Non-Federal: $25,455,900
                                                                                                                                               Total: $74,114,000

                                               13. USVI          Turpentine Run, St. Thomas                    August 17, 2020                 Federal: $29,817,850
                                                                                                                                               Non-Federal: $15,311,150
                                                                                                                                               Total: $45,129,000


                                                (3) HURRICANE AND STORM DAMAGE RISK RE-
                                              DUCTION.—

                                                                                                                           C.
                                                                                                                         Date of                                              D.
                                                                                     B.
                                                  A. State                                                              Report of                                         Estimated
                                                                                    Name                                 Chief of                                           Costs
                                                                                                                        Engineers

                                               1. DE             Delaware Beneficial Use of Dredged            March 6, 2020                   Initial Federal: $66,464,000
                                                                  Material for the Delaware River                                              Initial Non-Federal: $35,789,000
                                                                                                                                               Total: $102,253,000
                                                                                                                                               Renourishment Federal: $120,023,000
                                                                                                                                               Renourishment Non-Federal: $120,023,000
                                                                                                                                               Renourishment Total: $240,046,000

                                               2. NJ             New Jersey Beneficial Use of                  April 8, 2020                   Initial Federal: $84,071,000
                                                                  Dredged Material for the Dela-                                               Initial Non-Federal: $45,270,000
                                                                  ware River                                                                   Total: $129,341,000
                                                                                                                                               Renourishment Federal: $85,495,000
                                                                                                                                               Renourishment Non-Federal: $85,495,000
                                                                                                                                               Renourishment Total: $170,990,000

                                               3. NJ             Rahway River Basin, New Jersey                June 9, 2020                    Federal: $48,322,000
                                                                  Coastal Storm Risk Management                                                Non-Federal: $26,020,000
                                                                                                                                               Total: $74,342,000

                                               4. NJ             Raritan Bay and Sandy Hook Bay,               August 25, 2020                 Federal: $107,680,000
                                                                  Highlands                                                                    Non-Federal: $57,981,000




SSpencer on DSK126QN23PROD with HOUSE
                                                                                                                                               Total: $165,661,000




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00064   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                   CONGRESSIONAL RECORD — HOUSE                                                            H6971
                                                                                                                           C.
                                                                                                                         Date of                                              D.
                                                                                     B.
                                                  A. State                                                              Report of                                         Estimated
                                                                                    Name                                 Chief of                                           Costs
                                                                                                                        Engineers

                                               5. NY             East Rockaway Inlet to Rockaway              August 22, 2019                  Initial Federal: $638,460,000
                                                                  Inlet and Jamaica Bay, Atlantic                                              Initial Non-Federal: $0
                                                                  Coast of New York                                                            Total: $638,460,000
                                                                                                                                               Renourishment Federal: $200,924,000
                                                                                                                                               Renourishment Non-Federal: $200,924,000
                                                                                                                                               Renourishment Total: $401,847,000

                                               6. NY             Fire Island Inlet to Montauk Point,          July 9, 2020                     Initial Federal: $1,576,790,000
                                                                   New York Reformulation                                                      Initial Non-Federal: $0
                                                                                                                                               Total: $1,576,790,000
                                                                                                                                               Renourishment Federal: $767,695,000
                                                                                                                                               Renourishment Non-Federal: $767,695,000
                                                                                                                                               Renourishment Total: $1,535,390,000

                                               7. NY             Hashamomuck Cove Coastal Storm               December 9, 2019                 Initial Federal: $11,920,000
                                                                  Risk Management                                                              Initial Non-Federal: $6,418,000
                                                                                                                                               Total: $18,338,000
                                                                                                                                               Renourishment Federal: $24,237,000
                                                                                                                                               Renourishment Non-Federal: $24,237,000
                                                                                                                                               Renourishment Total: $48,474,000

                                               8. RI             Pawcatuck River Coastal Storm                December 19, 2018                Federal: $37,679,000
                                                                  Risk Management Project                                                      Non-Federal: $20,289,000
                                                                                                                                               Total: $57,968,000

                                               9. VA             Norfolk Coastal Storm Risk Man-              February 5, 2019                 Federal: $942,920,000
                                                                  agement                                                                      Non-Federal: $507,730,000
                                                                                                                                               Total: $1,450,650,000


                                                (4) FLOOD RISK MANAGEMENT               AND     ECO-
                                              SYSTEM RESTORATION.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               1. CO             South Platte River and Tributaries,          July 29, 2019                    Federal: $344,076,000
                                                                  Adams and Denver Counties                                                    Non-Federal: $206,197,000
                                                                                                                                               Total: $550,273,000


                                                (5) ECOSYSTEM RESTORATION.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               1. CA             Delta Islands and Levees                     December 18, 2018                Federal: $17,251,000
                                                                                                                                               Non-Federal: $9,289,000
                                                                                                                                               Total: $26,540,000

                                               2. CA             Malibu Creek Ecosystem Restora-              November 13, 2020                Federal: $172,249,000
                                                                  tion, Los Angeles and Ventura                                                Non-Federal: $106,960,000
                                                                  Counties                                                                     Total: $279,209,000

                                               3. CA             Yuba River Ecosystem Restoration             June 20, 2019                    Federal: $66,975,000
                                                                                                                                               Non-Federal: $36,064,000
                                                                                                                                               Total: $103,039,000

                                               4. CO, NM,        Rio Grande, Environmental Man-               August 5, 2019                   Federal: $16,998,000
                                                 TX               agement Program, Sandia Pueblo                                               Non-Federal: $9,153,000
                                                                  to Isleta Pueblo, New Mexico,                                                Total: $26,151,000
                                                                  Ecosystem Restoration

                                               5. FL             Comprehensive Everglades Restora-            April 8, 2020                    Federal: $379,583,000
                                                                  tion Plan, Loxahatchee River Wa-                                             Non-Federal: $375,737,000
                                                                  tershed Restoration Project, Mar-                                            Total: $755,320,000
                                                                  tin and Palm Beach Counties

                                               6. IA, MO         Grand River Basin Ecosystem Res-             November 18, 2020                Federal: $78,876,000
                                                                  toration                                                                     Non-Federal: $42,471,000




SSpencer on DSK126QN23PROD with HOUSE
                                                                                                                                               Total: $121,347,000

                                               7. IL             The Great Lakes and Mississippi              May 23, 2019                     Federal: $557,730,550
                                                                  River Interbasin Study - Brandon                                             Non-Federal: $300,316,450
                                                                  Road, Will County                                                            Total: $858,047,000




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00065   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6972                                             CONGRESSIONAL RECORD — HOUSE                                                          December 8, 2020
                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               8. IL             South Fork of the South Branch of            July 9, 2020                     Federal: $11,657,000
                                                                  the Chicago River, Bubbly Creek,                                             Non-Federal: $6,277,000
                                                                  Ecosystem Restoration                                                        Total: $17,934,000

                                               9. MD             Anacostia Watershed Restoration,             December 19, 2018                Federal: $25,866,750
                                                                  Prince George’s County                                                       Non-Federal: $13,928,250
                                                                                                                                               Total: $39,795,000

                                               10. MO            St. Louis Riverfront- Meramec                November 1, 2019                 Federal: $61,362,893
                                                                   River Basin Ecosystem Restora-                                              Non-Federal: $33,042,107
                                                                   tion                                                                        Total: $94,405,000

                                               11. NY, NJ        Hudson-Raritan Estuary Ecosystem             May 26, 2020                     Federal: $273,933,000
                                                                  Restoration                                                                  Non-Federal: $147,502,000
                                                                                                                                               Total: $421,435,000

                                               12. NY            Hudson River Habitat Restoration             November 19, 2020                Federal: $33,479,000
                                                                                                                                               Non-Federal: $11,159,000
                                                                                                                                               Total: $44,638,000

                                               13. TX            Jefferson County Ecosystem Res-              September 12, 2019               Federal: $38,942,000
                                                                   toration                                                                    Non-Federal: $20,969,000
                                                                                                                                               Total: $59,911,000


                                                (6) WATER SUPPLY.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                              Report of                                             Costs
                                                                                                                  Chief of Engineers

                                               1. OR             Willamette River Basin Review Re-            December 18, 2019                Federal: $0
                                                                  allocation,                                                                  Non-Federal: $0
                                                                                                                                               Total: $0


                                                (7) MODIFICATIONS AND OTHER PROJECTS.—

                                                                                                                           C.                                                 D.
                                                                                     B.                                 Date of
                                                  A. State                                                                                                                Estimated
                                                                                    Name                                Decision                                            Costs
                                                                                                                       Document

                                               1. CA             San Luis Rey Flood Control                   July 24, 2020                    Federal: $143,407,500
                                                                  Project, San Diego County                                                    Non-Federal: $47,802,500
                                                                                                                                               Total: $191,210,000

                                               2. FL             Caloosahatchee River West Basin              July 24, 2020                    Federal: $514,999,000
                                                                  Storage Reservoir (C-43 WBSR)                                                Non-Federal: $514,999,000
                                                                                                                                               Total: $1,029,998,000

                                               3. FL             Central and Southern Florida,                September 15, 2020               Federal: $66,736,500
                                                                  Canal 111 (C-111) South Dade                                                 Non-Federal: $66,736,500
                                                                  Project                                                                      Total: $133,473,000

                                               4. KY             Kentucky Lock                                June 9, 2020                     Total: $1,166,809,000

                                               5. NC             Carolina Beach Integrated Beach              June 16, 2020                    Federal: $25,125,000
                                                                  Renourishment                                                                Non-Federal: $25,125,000
                                                                                                                                               Total: $50,250,000

                                               6. NC             Wrightsville Beach                           July 2, 2020                     Federal: $60,068,000
                                                                                                                                               Non-Federal: $18,486,000
                                                                                                                                               Total: $78,554,000
                                                                                                                                               Renourishment Federal: $18,918,900
                                                                                                                                               Renourishment Non-Federal: $10,187,100
                                                                                                                                               Renourishment Total: $29,106,000

                                               7. TX             Corpus Christi Ship Channel, Deep-           May 4, 2020                      Federal: $406,343,000
                                                                  ening and Widening and Barge                                                 Non-Federal: $275,274,000
                                                                  Shelves                                                                      Total: $681,617,000

                                               8. VA             Atlantic Intracoastal Waterway               October 19, 2020                 Federal: $59,500,000
                                                                  Deep Creek Bridge Replacement                                                Non-Federal: $0
                                                                                                                                               Total: $59,500,000




SSpencer on DSK126QN23PROD with HOUSE
                                              SEC. 402. SPECIAL RULES.                                Great Lakes and Mississippi River Interbasin           Chief of Engineers, dated May 23, 2019, with
                                                (a) GREAT LAKES AND MISSISSIPPI RIVER                 project, Brandon Road, Will County, Illinois,          the following modifications:
                                              INTERBASIN PROJECT, BRANDON ROAD, WILL                  authorized by section 401 of this Act, sub-              (1) The Federal share of the cost of con-
                                              COUNTY, ILLINOIS.—The Secretary shall carry             stantially in accordance with the terms and            struction shall be 80 percent.
                                              out the project for ecosystem restoration,              conditions described in the Report of the




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00066   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6973
                                                (2) The Secretary may include the addition            and at an estimated total cost of $97,958,972          cific efforts at federally authorized water re-
                                              or substitution of technologies or measures             for periodic nourishment over the 50-year life         sources development projects located in—
                                              not described in the report, as the Secretary           of the project.                                          (1) high-altitude lakes; and
                                              determines to be advisable.                               (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—               (2) the Tennessee and Cumberland River
                                                (b) EAST ROCKAWAY INLET TO ROCKAWAY                   The project for navigation, Baptiste Collette          basins.
                                              INLET AND JAMAICA BAY REFORMULATION,                    Bayou, Louisiana, as described in the review           SEC.   502.   AQUATIC   INVASIVE   SPECIES   RE-
                                              NEW YORK.—The project for hurricane and                 assessment of the Secretary, titled ‘‘Review                         SEARCH.
                                              storm damage reduction, East Rockaway                   Assessment of Plaquemines Parish Govern-                 Section 1108 of the Water Resources Devel-
                                              Inlet to Rockaway Inlet and Jamaica Bay,                ment’s Section 203 Study Baptiste Collette             opment Act of 2018 (33 U.S.C. 2263a) is amend-
                                              Atlantic Coast of New York, authorized by               Bayou      Navigation     Channel      Deepening       ed—
                                              section 401 of this Act, shall be considered to         Project Integrated Feasibility Study and En-             (1) in subsection (a)—
                                              be a continuation of the interim response to            vironmental Assessment (January 2017,                    (A) by striking ‘‘management’’ and insert-
                                              the authorization by the House of Represent-            Amended April 2018)’’ and dated June 2018, at          ing ‘‘prevention, management,’’; and
                                              atives dated September 20, 1997, and the au-            a total cost of $44,920,000.                             (B) by inserting ‘‘, elodea, quagga mus-
                                              thorization under the heading ‘‘Department                (3) HOUMA NAVIGATION CANAL, LOUISIANA.—              sels,’’ after ‘‘Asian carp’’; and
                                              of the Army—Corps of Engineers—Civil—                   The project for navigation, Houma Naviga-                (2) in subsection (b)—
                                              Construction’’ under chapter 4 of title X of            tion Canal, Louisiana, as described in the re-           (A) by inserting ‘‘or could be impacted in
                                              the Disaster Relief Appropriations Act, 2013            view assessment of the Secretary, titled ‘‘Re-         the future’’ after ‘‘impacted’’; and
                                              (127 Stat. 24).                                         view Assessment of Houma Navigation Canal                (B) by striking ‘‘Pacific’’ and all that fol-
                                                (c) TULSA AND WEST-TULSA LEVEE SYSTEM,                Deepening Project Section 203 Integrated               lows through the period at the end and in-
                                              TULSA COUNTY, OKLAHOMA.—For the project                 Feasibility Report and DRAFT Environ-                  serting ‘‘Pacific, Arctic, and Gulf Coasts, the
                                              for flood risk management, Tulsa and West-              mental Impact Statement (June 2018)’’ and              Great Lakes, and reservoirs operated and
                                              Tulsa Levee System, Tulsa County, Okla-                 dated July 2018, at a total cost of $253,458,000.      maintained by the Secretary.’’.
                                              homa, authorized by section 401 of this Act,              (4) PORT FOURCHON BELLE PASS CHANNEL,                SEC. 503. TERRESTRIAL NOXIOUS WEED CON-
                                              the non-Federal contribution for the project            LOUISIANA.—The project for navigation, Port                       TROL PILOT PROGRAM.
                                              shall be financed over a period of 30 years             Fourchon Belle Pass Channel, Louisiana, as               (a) IN GENERAL.—The Secretary shall carry
                                              from the date of completion of the project, in          described in the review assessment of the              out a pilot program, in consultation with the
                                              accordance with section 103(k) of the Water             Secretary, titled ‘‘Review Assessment of               Federal Interagency Committee for the Man-
                                              Resources Development Act of 1986 (33 U.S.C.            Port Fourchon Belle Pass Channel Deepening             agement of Noxious and Exotic Weeds, to
                                              2213(k)).                                               Project Section 203 Feasibility Study (Janu-
                                                (d) WILLAMETTE RIVER BASIN REVIEW RE-                                                                        identify and develop new and improved strat-
                                                                                                      ary 2019, revised January 2020)’’ and dated            egies for terrestrial noxious weed control on
                                              ALLOCATION STUDY.—The Secretary shall                   April 2020, at a total cost of $95,483,000.
                                              carry out the project for water supply, Wil-                                                                   Federal land under the jurisdiction of the
                                                                                                        (5) WILMINGTON HARBOR, NORTH CAROLINA.—              Secretary.
                                              lamette River Basin Review Reallocation,                The project for navigation, Wilmington Har-
                                              Oregon, authorized by section 401 of this Act,                                                                   (b) PARTNERSHIPS.—In carrying out the
                                                                                                      bor, North Carolina, as described in the re-           pilot program under subsection (a), the Sec-
                                              substantially in accordance with the terms              view assessment of the Secretary, titled ‘‘Re-
                                              and conditions described in the Report of the                                                                  retary shall act in partnership with such
                                                                                                      view Assessment of Wilmington Harbor,                  other individuals and entities as the Sec-
                                              Chief of Engineers, dated December 18, 2019,            North Carolina Navigation Improvement
                                              with the following modifications:                                                                              retary determines to be appropriate.
                                                                                                      Project Integrated Section 203 Study & Envi-             (c) COOPERATIVE AGREEMENTS.—The Sec-
                                                (1) The Secretary shall meet the obliga-              ronmental Report (February 2020)’’ and dated
                                              tions of the Corps of Engineers under the En-                                                                  retary may utilize cooperative agreements
                                                                                                      May 2020, at a total cost of $834,093,000.             with county and State agencies for the im-
                                              dangered Species Act of 1973 by complying                 (6) CHACON CREEK, TEXAS.—The project for
                                              with the June 2019 NMFS Willamette Basin                                                                       plementation of the pilot program under sub-
                                                                                                      flood risk management, ecosystem restora-              section (a).
                                              Review Study Biological Opinion Reasonable              tion, and other purposes, Chacon Creek,
                                              and Prudent Alternative until such time, if                                                                      (d) REPORT TO CONGRESS.—Not later than 2
                                                                                                      Texas, as described in the review assessment           years after the date of enactment of this
                                              any, as it is modified or replaced, in whole or         of the Secretary, titled ‘‘Review Assessment
                                              in part, through the consultation process                                                                      Act, the Secretary shall provide to the Com-
                                                                                                      of Chacon Creek, Texas Section 203 Inte-               mittee on Environment and Public Works of
                                              under section 7(a) of the Endangered Species            grated Feasibility Report and DRAFT Envi-
                                              Act of 1973.                                                                                                   the Senate and the Committee on Transpor-
                                                                                                      ronmental Assessment (August 2018)’’ and               tation and Infrastructure of the House of
                                                (2) The Secretary may reallocate not more             dated September 2018, at a total cost of
                                              than 10 percent of overall storage in the                                                                      Representatives a report describing the new
                                                                                                      $51,973,000.                                           and improved strategies developed through
                                              joint conservation pool, as authorized by                 (b) REQUIREMENTS.—The Secretary may
                                              this Act and without further congressional                                                                     the pilot program under subsection (a).
                                                                                                      only carry out a project authorized under              SEC. 504. INVASIVE SPECIES RISK ASSESSMENT,
                                              action, if such reallocation is consistent              subsection (a)—                                                    PRIORITIZATION,   AND   MANAGE-
                                              with the ongoing consultation under section               (1) substantially in accordance with the ap-                     MENT.
                                              7(a) of the Endangered Species Act of 1973 re-          plicable review assessment for the project
                                              lated to Willamette Valley System oper-                                                                          Section 528(f)(2) of the Water Resources De-
                                                                                                      submitted by the Secretary under section               velopment Act of 1996 (110 Stat. 3771) is
                                              ations.                                                 203(c) of the Water Resources Development
                                                (3) The Secretary shall ensure that the re-                                                                  amended—
                                                                                                      Act of 1986, as identified in subsection (a) of          (1) by redesignating subparagraphs (I) and
                                              vised reallocation is not reallocated from a            this section, and subject to such modifica-
                                              single storage use, does not seriously affect                                                                  (J) as subparagraphs (J) and (K), respec-
                                                                                                      tions or conditions as the Secretary con-              tively;
                                              authorized project purposes, and does not               siders appropriate and identifies in a final
                                              otherwise involve major operational changes                                                                      (2) by inserting after subparagraph (H) the
                                                                                                      assessment that addresses the concerns, rec-           following:
                                              to the project.                                         ommendations, and conditions identified by
                                                (e) CANO MARTIN PENA, SAN JUAN, PUERTO                                                                         ‘‘(I) shall, using existing amounts appro-
                                                                                                      the Secretary in the applicable review as-             priated to the Task Force, develop and up-
                                              RICO.—Section 5127 of the Water Resources               sessment; and
                                              Development Act of 2007 (121 Stat. 1242) is                                                                    date, as appropriate, a priority list of
                                                                                                        (2) after the Secretary transmits to the             invasive species that—
                                              amended by striking ‘‘$150,000,000’’ and in-            Committee on Transportation and Infra-
                                              serting ‘‘$255,816,000’’.                                                                                        ‘‘(i) reflects an assessment of ecological
                                                                                                      structure of the House of Representatives              risk that the listed invasive species rep-
                                              SEC. 403. AUTHORIZATION OF PROJECTS BASED               and the Committee on Environment and
                                                          ON    FEASIBILITY STUDIES PRE-                                                                     resent;
                                                          PARED BY NON-FEDERAL INTER-
                                                                                                      Public Works of the Senate such final assess-            ‘‘(ii) includes populations of invasive
                                                          ESTS.                                       ment.                                                  plants and animals that—
                                                (a) IN GENERAL.—The Secretary is author-                       TITLE V—OTHER MATTERS                           ‘‘(I) are significantly impacting the struc-
                                              ized to carry out the following projects for            SEC. 501. UPDATE ON INVASIVE SPECIES POLICY            ture and function of ecological communities,
                                              water resources development and conserva-                           GUIDANCE.                                  native species, or habitat within the South
                                              tion and other purposes, subject to sub-                  (a) IN GENERAL.—The Secretary shall peri-            Florida ecosystem; or
                                              section (b):                                            odically update the Invasive Species Policy              ‘‘(II) demonstrate a strong potential to re-
                                                (1) FORT PIERCE, ST. LUCIE COUNTY, FLOR-              Guidance, developed under section 104 of the           duce, obscure, or otherwise alter key indica-
                                              IDA.—The project for hurricane and storm                River and Harbor Act of 1958 (33 U.S.C. 610)           tors used to measure Everglades restoration




SSpencer on DSK126QN23PROD with HOUSE
                                              damage reduction, Fort Pierce, St. Lucie                and the Nonindigenous Aquatic Nuisance                 progress; and
                                              County, Florida, as described in the review             Prevention and Control Act of 1990 (16 U.S.C.            ‘‘(iii) shall be used by the Task Force and
                                              assessment of the Secretary, titled ‘‘Review            4701 et seq.), in accordance with the most re-         agencies and entities represented on the
                                              Assessment of St. Lucie County, Florida                 cent National Invasive Species Council Man-            Task Force to focus cooperative and collabo-
                                              Fort Pierce Shore Protection Project Sec-               agement Plan developed pursuant to Execu-              rative efforts—
                                              tion 203 Integrated Feasibility Study and En-           tive Order 13112.                                        ‘‘(I) to guide applied research;
                                              vironmental Assessment (June 2018)’’ and                  (b) INCLUSION.—The Secretary may include               ‘‘(II) to develop innovative strategies and
                                              dated July 2018, at a total cost of $33,107,639,        in the updated guidance invasive species spe-          tools to facilitate improved management,




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00067   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6974                                             CONGRESSIONAL RECORD — HOUSE                                                      December 8, 2020
                                              control, or eradication of listed invasive spe-         the Governors and entities described in para-            ‘‘(i) ELIGIBLE ENTITY.—The term ‘eligible
                                              cies;                                                   graph (3).’’;                                          entity’ means a partnership between or
                                                ‘‘(III) to implement specific management,               (C) in paragraph (3)(A), by striking ‘‘(iii)’’       among 2 or more entities that—
                                              control, or eradication activities at the ap-           and inserting ‘‘(v)’’; and                               ‘‘(I) includes—
                                              propriate periodicity and intensity necessary             (D) by striking ‘‘watercraft inspection sta-           ‘‘(aa) at least 1 flood control district; and
                                              to reduce or neutralize the impacts of listed           tions’’ each place it appears and inserting              ‘‘(bb) at least 1 city, county, township,
                                              invasive species, including the use of quali-           ‘‘watercraft inspection and decontamination            town, borough, parish, village, or other gen-
                                              fied skilled volunteers when appropriate; and           stations’’; and                                        eral purpose political subdivision of a State
                                                ‘‘(IV) to develop innovative strategies and             (3) by adding at the end the following:              or Indian Tribe (as defined in section 4 of the
                                              tools to prevent future introductions of non-             ‘‘(f) INVASIVE SPECIES MANAGEMENT PILOT              Indian Self-Determination and Education
                                              native species;’’;                                      PROGRAM.—                                              Assistance Act (25 U.S.C. 5304)); and
                                                (3) in subparagraph (J) (as so redesignated),           ‘‘(1) DEFINITION OF INVASIVE SPECIES.—In               ‘‘(II) may include any other entity (such as
                                              by striking ‘‘ecosystem’’ and inserting ‘‘eco-          this subsection, the term ‘invasive species’           a nonprofit organization or institution of
                                              system, including the activities described in           has the meaning given the term in section 1            higher education), as determined by the Sec-
                                              subparagraph (I)’’; and                                 of Executive Order 13112 (64 Fed. Reg. 6183;           retary.
                                                (4) in clause (i) of subparagraph (K) (as so          relating to invasive species (February 3,                ‘‘(ii) INVASIVE PLANT SPECIES.—The term
                                              redesignated), by inserting ‘‘, including the           1999)) (as amended by section 2 of Executive           ‘invasive plant species’ means a plant that is
                                              priority list under subparagraph (I) and the            Order 13751 (81 Fed. Reg. 88609; relating to           nonnative to the ecosystem under consider-
                                              activities described in that subparagraph’’             safeguarding the Nation from the impacts of            ation, the introduction of which causes or is
                                              after ‘‘Task Force’’.                                   invasive species (December 5, 2016))).                 likely to cause economic harm or harm to
                                              SEC. 505. INVASIVE SPECIES MITIGATION AND                 ‘‘(2) DEVELOPMENT OF PLANS.—The Sec-                 human health.
                                                          REDUCTION.                                  retary, in coordination with the Aquatic                 ‘‘(B) PILOT PROGRAM.—The Secretary of the
                                                                                                      Nuisance Species Task Force, shall carry out           Interior, acting through the Director of the
                                                 Section 104 of the River and Harbor Act of
                                                                                                      a pilot program under which the Secretary              United States Fish and Wildlife Service,
                                              1958 (33 U.S.C. 610) is amended—
                                                                                                      shall collaborate with States in the Upper             shall establish a pilot program under which
                                                 (1) in subsection (b)—
                                                                                                                                                             such Secretary shall work with eligible enti-
                                                 (A) in paragraph (1)—                                Missouri River Basin in developing vol-
                                                                                                                                                             ties to carry out activities—
                                                 (i) in the matter preceding subparagraph             untary aquatic invasive species management
                                                                                                                                                               ‘‘(i) to remove invasive plant species in ri-
                                              (A), by striking ‘‘this section $110,000,000’’          plans to mitigate the effects of invasive spe-
                                                                                                                                                             parian areas that contribute to drought con-
                                              and inserting ‘‘this section (except for sub-           cies on public infrastructure facilities lo-
                                                                                                                                                             ditions in—
                                              sections (f) and (g)) $130,000,000’’;                   cated on reservoirs of the Corps of Engineers
                                                                                                                                                               ‘‘(I) the Lower Colorado River Basin;
                                                 (ii) in subparagraph (B), by striking ‘‘and’’        in those States.
                                                                                                                                                               ‘‘(II) the Rio Grande River Basin;
                                              at the end;                                               ‘‘(3) MANAGEMENT PLAN.—
                                                                                                                                                               ‘‘(III) the Texas Gulf Coast Basin; and
                                                 (iii) in subparagraph (C), by striking the             ‘‘(A) IN GENERAL.—The Secretary, in con-
                                                                                                                                                               ‘‘(IV) the Arkansas-White-Red Basin;
                                              period at the end and inserting a semicolon;            sultation with the Governor of each State in
                                                                                                                                                               ‘‘(ii) where appropriate, to replace the
                                              and                                                     the Upper Missouri River Basin that elects
                                                                                                                                                             invasive plant species described in clause (i)
                                                 (iv) by adding at the end the following:             to participate in the pilot program, shall             with ecologically suitable native species; and
                                                 ‘‘(D) $30,000,000 shall be made available to         prepare a management plan, or update or ex-              ‘‘(iii) to maintain and monitor riparian
                                              carry out subsection (d)(1)(A)(iv); and                 pand an existing plan, for each participating          areas in which activities are carried out
                                                 ‘‘(E) $10,000,000 shall be made available to         State that identifies public infrastructure            under clauses (i) and (ii).
                                              carry out subsection (d)(1)(A)(v).’’;                   facilities located on reservoirs of the Corps            ‘‘(C) REPORT TO CONGRESS.—Not later than
                                                 (B) by redesignating paragraph (2) as para-          of Engineers in those States that—                     18 months after the date of enactment of this
                                              graph (3);                                                ‘‘(i) are affected by aquatic invasive spe-          subsection, the Secretary of the Interior,
                                                 (C) by inserting after paragraph (1) the fol-        cies; and                                              acting through the Director of the United
                                              lowing:                                                   ‘‘(ii) need financial and technical assist-          States Fish and Wildlife Service, shall sub-
                                                 ‘‘(2) OTHER PROGRAMS.—                               ance in order to maintain operations.                  mit to the Committee on Environment and
                                                 ‘‘(A) IN GENERAL.—There are authorized to              ‘‘(B) USE OF EXISTING PLANS.—In developing           Public Works of the Senate and the Com-
                                              be appropriated—                                        a management plan under subparagraph (A),              mittee on Transportation and Infrastructure
                                                 ‘‘(i) $10,000,000 for each of fiscal years 2021      the Secretary shall consider a management              of the House of Representatives a report de-
                                              through 2024 to carry out subsection (f); and           plan submitted by a participating State                scribing the implementation of the pilot pro-
                                                 ‘‘(ii) $50,000,000 for each of fiscal years 2021     under section 1204(a) of the Nonindigenous             gram.
                                              through 2024 to carry out subsection (g)(2).            Aquatic Nuisance Prevention and Control                  ‘‘(D) TERMINATION OF AUTHORITY.—The au-
                                                 ‘‘(B) INVASIVE PLANT SPECIES PILOT PRO-              Act of 1990 (16 U.S.C. 4724(a)).                       thority provided under this paragraph shall
                                              GRAM.—There is authorized to be appro-                    ‘‘(4) TERMINATION OF AUTHORITY.—The au-              terminate on September 30, 2024.
                                              priated to the Secretary of the Interior, act-          thority provided under this subsection shall             ‘‘(4) COST SHARE.—The Federal share of an
                                              ing through the Director of the United                  terminate on September 30, 2024.                       action carried out under a partnership under
                                              States Fish and Wildlife Service, $10,000,000             ‘‘(g) INVASIVE SPECIES PREVENTION, CON-              paragraph (2) or an activity carried out
                                              to carry out subsection (g)(3).’’; and                  TROL, AND ERADICATION.—                                under the pilot program under paragraph (3)
                                                 (D) in paragraph (3) (as so redesignated), by          ‘‘(1) DEFINITION OF INVASIVE SPECIES.—In             shall not exceed 80 percent of the total cost
                                              inserting ‘‘or (2)(A)’’ after ‘‘paragraph (1)’’;        this subsection, the term ‘invasive species’           of the action or activity.’’.
                                                 (2) in subsection (d)—                               has the meaning given the term in section 1            SEC. 506. AQUATIC INVASIVE SPECIES PREVEN-
                                                 (A) in the subsection heading, by inserting          of Executive Order 13112 (64 Fed. Reg. 6183;                       TION.
                                              ‘‘AND DECONTAMINATION’’ after ‘‘INSPECTION’’;           relating to invasive species (February 3,                 Section 1039(b) of the Water Resources Re-
                                                 (B) in paragraph (1)—                                1999)) (as amended by section 2 of Executive           form and Development Act of 2014 (16 U.S.C.
                                                 (i) in subparagraph (A)—                             Order 13751 (81 Fed. Reg. 88609; relating to           4701 note) is amended—
                                                 (I) in the subparagraph heading, by insert-          safeguarding the Nation from the impacts of               (1) in paragraph (1)—
                                              ing ‘‘AND DECONTAMINATION’’ after ‘‘INSPEC-             invasive species (December 5, 2016))).                    (A) in the paragraph heading, by striking
                                              TION’’;                                                   ‘‘(2) INVASIVE SPECIES PARTNERSHIPS.—                ‘‘UPPER MISSISSIPPI AND OHIO RIVER BASINS
                                                 (II) in clause (ii), by striking ‘‘and’’ at the        ‘‘(A) IN GENERAL.—The Secretary may                  AND TRIBUTARIES’’ and inserting ‘‘MISSISSIPPI
                                              end;                                                    enter into partnerships with applicable                RIVER AND TRIBUTARIES, INCLUDING SUB-BA-
                                                 (III) in clause (iii), by striking ‘‘Arizona         States and other Federal agencies to carry             SINS’’;
                                              River Basins.’’ and inserting ‘‘Arkansas                out actions to prevent the introduction of,               (B) in subparagraph (A), by striking
                                              River Basins;’’; and                                    control, or eradicate, to the maximum ex-              ‘‘Upper Mississippi and Ohio River basins
                                                 (IV) by adding at the end the following:             tent practicable, invasive species that ad-            and tributaries’’ and inserting ‘‘Mississippi
                                                 ‘‘(iv) to protect the Russian River Basin,           versely impact water quantity or water qual-           River and tributaries, including the 6 sub-ba-
                                              California; and                                         ity in the Platte River Basin, the Upper Col-          sins of the River,’’; and
                                                 ‘‘(v) to protect basins and watersheds that          orado River Basin, the Upper Snake River                  (C) in subparagraph (B), by striking ‘‘and
                                              adjoin an international border between the              Basin, and the Upper Missouri River Basin.             the document prepared’’ and all that follows
                                              United States and Canada.’’; and                          ‘‘(B) PRIORITIZATION.—In selecting actions           through ‘‘February 2012.’’ and inserting ‘‘the
                                                 (ii) by striking subparagraph (B) and in-            to carry out under a partnership under sub-            Mississippi River Basin Asian Carp Control




SSpencer on DSK126QN23PROD with HOUSE
                                              serting the following:                                  paragraph (A), the Secretary shall give pri-           Strategy Framework, and the Asian Carp
                                                 ‘‘(B) LOCATIONS.—The Secretary shall place           ority to projects that are intended to control         Regional Coordinating Committee’s Asian
                                              watercraft inspection and decontamination               or eradicate the Russian olive (Elaeagnus              Carp Action Plan.’’; and
                                              stations under subparagraph (A) at locations            angustifolia) or saltcedar (of the genus                  (2) in paragraph (2)—
                                              with the highest likelihood of preventing the           Tamarix).                                                 (A) in subparagraph (A)—
                                              spread of aquatic invasive species into and               ‘‘(3) INVASIVE PLANT SPECIES PILOT PRO-                 (i) by striking ‘‘December 31 of each year’’
                                              out of waters of the United States, as deter-           GRAM.—                                                 and inserting ‘‘December 31, 2020, and bienni-
                                              mined by the Secretary in consultation with               ‘‘(A) DEFINITIONS.—In this paragraph:                ally thereafter’’; and




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00068   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6975
                                                (ii) by striking ‘‘Upper Mississippi and                (g) SUNSET.—The authority under this sec-              (b) FISH AND WILDLIFE SERVICE ASIAN CARP
                                              Ohio River basins and tributaries’’ and in-             tion shall terminate on the date that is 5             ERADICATION PROGRAM.—
                                              serting ‘‘Mississippi River and tributaries,            years after the date of enactment of this                (1) ESTABLISHMENT.—The Secretary of the
                                              including the 6 sub-basins of the River’’; and          Act.                                                   Interior, acting through the Director of the
                                                (B) in subparagraph (B)—                              SEC. 509. ASIAN CARP PREVENTION AND CON-               United States Fish and Wildlife Service,
                                                (i) in clause (i), by striking ‘‘Upper Mis-                       TROL PILOT PROGRAM.                        shall establish a program to provide finan-
                                              sissippi and Ohio River basins and tribu-                 (a) CORPS OF ENGINEERS ASIAN CARP PRE-               cial assistance to States to implement meas-
                                              taries’’ and inserting ‘‘Mississippi River and          VENTION PILOT PROGRAM.—                                ures, including for management, research,
                                              tributaries, including the 6 sub-basins of the            (1) IN GENERAL.—The Secretary, in con-               and public education activities, necessary to
                                              River,’’; and                                           junction with the Tennessee Valley Author-             eradicate the Asian carp.
                                                (ii) in clause (ii), by striking ‘‘Upper Mis-         ity and other relevant Federal agencies,                 (2) ELIGIBILITY.—A State is eligible to re-
                                              sissippi and Ohio River basins and tribu-               shall carry out an Asian carp prevention               ceive financial assistance under this sub-
                                              taries’’ and inserting ‘‘Mississippi River and          pilot program to carry out projects to man-            section if such State has demonstrated to
                                              tributaries, including the 6 sub-basins of the          age and prevent the spread of Asian carp               the Secretary of the Interior sufficient need
                                              River’’.                                                using innovative technologies, methods, and            to implement measures to eradicate the
                                              SEC. 507. INVASIVE SPECIES IN ALPINE LAKES                                                                     Asian carp.
                                                                                                      measures.
                                                          PILOT PROGRAM.                                                                                       (3) PRIORITY.—In providing financial assist-
                                                                                                        (2) PROJECT SELECTION.—
                                                (a) ESTABLISHMENT.—The Secretary of the                                                                      ance under the program, the Secretary of the
                                                                                                        (A) LOCATION.—Each project under the
                                              Interior, acting through the Director of the                                                                   Interior shall give priority to States in the
                                                                                                      pilot program shall be carried out in a river
                                              United States Fish and Wildlife Service,                                                                       Cumberland River Watershed or the Ten-
                                                                                                      system or reservoir in the Cumberland River
                                              shall establish a pilot program (referred to in                                                                nessee River Watershed in which Asian carp
                                                                                                      Watershed or Tennessee River Watershed in
                                              this section as the ‘‘pilot program’’) to de-                                                                  populations are expanding or have been doc-
                                                                                                      which Asian carp populations are expanding
                                              velop and carry out effective measures nec-                                                                    umented.
                                                                                                      or have been documented.
                                              essary to prevent, control, or eradicate                                                                         (4) COST SHARING.—
                                                                                                        (B) CONSULTATION.—In selecting projects to             (A) FEDERAL SHARE.—The Federal share of
                                              aquatic invasive species in alpine lakes that           carry out under the pilot program, the Sec-
                                              are not located within a unit of the National                                                                  the costs of activities carried out under the
                                                                                                      retary shall consult with—                             program may not exceed 80 percent of the
                                              Park System.                                              (i) applicable Federal, State, and local
                                                (b) PARTNERSHIPS.—The Secretary of the                                                                       total costs of such activities.
                                                                                                      agencies;                                                (B) IN-KIND CONTRIBUTIONS.—The non-Fed-
                                              Interior, acting through the Director of the              (ii) institutions of higher education; and
                                              United States Fish and Wildlife Service,                                                                       eral share of the costs of activities carried
                                                                                                        (iii) relevant private organizations, includ-        out under the program may be provided in
                                              shall offer to enter into a partnership to              ing nonprofit organizations.
                                              carry out the pilot program with—                                                                              the form of in-kind contributions of mate-
                                                                                                        (C) LIMITATIONS.—                                    rials or services.
                                                (1) any relevant partnering Federal agency;             (i) NUMBER OF PROJECTS.—The Secretary
                                              and                                                                                                              (5) LIMITATION ON ADMINISTRATIVE EX-
                                                                                                      may select not more than 10 projects to                PENSES.—Not more than 5 percent of finan-
                                                (2) any relevant compact agency organized             carry out under the pilot program.
                                              with the consent of Congress under article I,                                                                  cial assistance provided by the Secretary of
                                                                                                        (ii) DEADLINE.—Not later than September              the Interior under this subsection may be
                                              section 10 of the Constitution of the United            30, 2024, the Secretary shall complete
                                              States.                                                                                                        used for administrative expenses.
                                                                                                      projects selected to be carried out under the            (6) AUTHORIZATION OF APPROPRIATIONS.—
                                                (c) AUTHORIZATION OF APPROPRIATIONS.—
                                                                                                      pilot program.                                         There is authorized to be appropriated to the
                                              There is authorized to be appropriated to
                                                                                                        (3) BEST PRACTICES.—In carrying out the              Secretary of the Interior to carry out this
                                              carry out the pilot program $25,000,000 for
                                                                                                      pilot program, to the maximum extent prac-             subsection $4,000,000 for each of fiscal years
                                              the period of fiscal years 2022 through 2024.
                                                                                                      ticable, the Secretary shall consider existing         2021 through 2025.
                                              SEC. 508. MURDER HORNET ERADICATION PILOT
                                                          PROGRAM.
                                                                                                      best practices, such as those described in the         SEC. 510. INVASIVE SPECIES IN NONCONTIGUOUS
                                                (a) GRANT AUTHORITY.—The Secretary of                 document of the Asian Carp Working Group                            STATES AND TERRITORIES PILOT
                                              the Interior, acting through the Director of            of the Aquatic Nuisance Species Task Force                          PROGRAM.
                                                                                                      entitled ‘‘Management and Control Plan for               (a) ESTABLISHMENT.—The Secretary of the
                                              the Fish and Wildlife Service, and in con-
                                                                                                      Bighead, Black, Grass, and Silver Carps in             Interior, acting through the Director of the
                                              sultation with all relevant Federal agencies,
                                                                                                      the United States’’ and dated November 2007.           United States Fish and Wildlife Service,
                                              shall establish a pilot program to provide fi-
                                                                                                        (4) COST-SHARE.—                                     shall establish a pilot program to carry out
                                              nancial assistance to States for manage-
                                                                                                        (A) IN GENERAL.—The Federal share of the             measures necessary to prevent, control, or
                                              ment, research, and public education activi-                                                                   eradicate invasive species in culturally sig-
                                                                                                      costs of a project carried out under the pro-
                                              ties necessary to—                                                                                             nificant forested watersheds in noncontig-
                                                                                                      gram may not exceed 75 percent of the total
                                                (1) eradicate the Asian giant hornet; and                                                                    uous States and territories of the United
                                                                                                      costs of the project.
                                                (2) restore bee populations damaged by the                                                                   States in which the Corps of Engineers is
                                                                                                        (B) OPERATION, MAINTENANCE, REHABILITA-
                                              Asian giant hornet.                                                                                            carrying     out   flood   risk  management
                                                (b) ELIGIBILITY.—A State is eligible to re-           TION, AND REPAIR.—After the completion of a
                                                                                                      project under the pilot program, the Federal           projects.
                                              ceive financial assistance under this section                                                                    (b) IMPLEMENTATION.—The Secretary of the
                                              if the State has demonstrated to the Sec-               share of the costs for operation, mainte-
                                                                                                      nance, rehabilitation, and repair of the               Interior, acting through the Director of the
                                              retary of the Interior sufficient need to im-                                                                  United States Fish and Wildlife Service, is
                                              plement measures to eradicate the Asian                 project shall be 100 percent.
                                                                                                                                                             encouraged to carry out the measures de-
                                              giant hornet.                                             (5) MEMORANDUM OF AGREEMENT.—For
                                                                                                                                                             scribed in subsection (a) in consultation
                                                (c) COST SHARING.—                                    projects carried out in reservoirs owned or
                                                                                                                                                             with—
                                                (1) FEDERAL SHARE.—The Federal share of               managed by the Tennessee Valley Authority,
                                                                                                                                                               (1) States, any territory or possession of
                                              the costs of activities carried out under the           the Secretary and the Tennessee Valley Au-
                                                                                                                                                             the United States, and units of local govern-
                                              pilot program may not exceed 75 percent of              thority shall execute a memorandum of
                                                                                                                                                             ment, including federally recognized Indian
                                              the total costs of such activities.                     agreement establishing the framework for a
                                                                                                                                                             Tribes (as defined in section 4 of the Indian
                                                (2) IN-KIND CONTRIBUTIONS.—The non-Fed-               partnership and the terms and conditions for
                                                                                                                                                             Self-Determination and Education Assist-
                                              eral share of the costs of activities carried           sharing expertise and resources.                       ance Act (25 U.S.C. 5304)); and
                                              out under the pilot program may be provided               (6) PAYMENTS.—The Secretary is author-                 (2) nonprofit organizations with knowledge
                                              in the form of in-kind contributions of mate-           ized to accept and expend funds from the               of, and experience in, forested watershed
                                              rials or services.                                      Tennessee Valley Authority to complete any             management, including nonprofit organiza-
                                                (d) LIMITATION ON ADMINISTRATIVE EX-                  work under this section at a reservoir owned           tions with a primary purpose of serving and
                                              PENSES.—Not more than 5 percent of finan-               or managed by the Tennessee Valley Author-             partnering with indigenous communities.
                                              cial assistance provided by the Secretary of            ity.                                                     (c) AUTHORIZATION OF APPROPRIATIONS.—
                                              the Interior under this section may be used               (7) REPORT.—Not later than 2 years after             There is authorized to be appropriated to
                                              for administrative expenses.                            the date of enactment of this Act, and 2               carry out the pilot program under subsection
                                                (e) AUTHORIZATION OF APPROPRIATIONS.—                 years thereafter, the Secretary shall submit           (a) $25,000,000 for the period of fiscal years
                                              There is authorized to be appropriated to the           to Congress a report describing the results of         2022 through 2024.
                                              Secretary of the Interior to carry out the              the pilot program, including an analysis of            SEC. 511. SOIL MOISTURE AND SNOWPACK MONI-
                                              pilot program $4,000,000 for each of fiscal             the effectiveness of the innovative tech-                          TORING.




SSpencer on DSK126QN23PROD with HOUSE
                                              years 2021 through 2025.                                nologies, methods, and measures used in                  (a) INSTALLATION OF NETWORK.—
                                                (f) DEFINITIONS.—In this section:                     projects carried out under the pilot program             (1) IN GENERAL.—In accordance with the ac-
                                                (1) ASIAN GIANT HORNET.—The term ‘‘Asian              at preventing the spread, or managing the              tivities required under section 4003(a) of the
                                              giant hornet’’ means a Vespa mandarinia.                eradicating of, Asian carp.                            Water Resources Reform and Development
                                                (2) STATE.—The term ‘‘State’’ means each                (8) AUTHORIZATION OF APPROPRIATIONS.—                Act of 2014 (128 Stat. 1310; 130 Stat. 1676), and
                                              of the several States, the District of Colum-           There is authorized to be appropriated to              to support the goals of the Weather Research
                                              bia, and the territories and insular posses-            carry out this subsection $25,000,000, to re-          and Forecasting Innovation Act of 2017 (Pub-
                                              sions of the United States.                             main available until expended.                         lic Law 115–25) and the National Integrated




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00069   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6976                                             CONGRESSIONAL RECORD — HOUSE                                                        December 8, 2020
                                              Drought Information System Reauthoriza-                   (v) flood risk and water resources moni-             inform and improve the missions of those
                                              tion Act of 2018 (Public Law 115–423), the Sec-         toring initiatives by the Secretary and the            agencies.
                                              retary, in coordination with the Adminis-               Commissioner; and                                         (B) REPORT REQUIRED.—Not later than 270
                                              trator of the National Oceanic and Atmos-                 (vi) any other programs or initiatives the           days after initiating the audit required by
                                              pheric Administration (referred to in this              Administrator considers appropriate;                   subparagraph (A), the Comptroller General
                                              section as the ‘‘Administrator’’), the Chief of           (C) at the request of State mesonet pro-             shall submit to the appropriate congres-
                                              the Natural Resources Conservation Service,             grams, or as the Administrator considers ap-           sional committees a report setting forth the
                                              the Director of the United States Geological            propriate, provide technical assistance to             findings of the audit.
                                              Survey, and the Commissioner of Reclama-                such programs under the pilot program                     (6) APPROPRIATE CONGRESSIONAL COMMIT-
                                              tion, shall continue installation of a network          under paragraph (1) to ensure proper data re-          TEES DEFINED.—In this subsection, the term
                                              of soil moisture and plains snowpack moni-              quirements; and                                        ‘‘appropriate    congressional committees’’
                                              toring stations, and modification of existing             (D) ensure an appropriate mechanism for              means—
                                              stations, in the Upper Missouri River Basin.            quality control and quality assurance is em-              (A) the Committee on Commerce, Science,
                                                (2) REQUIREMENTS.—In carrying out instal-             ployed for the data acquired under the pilot           and Transportation, the Committee on Envi-
                                              lation and modification activities under                program, such as the Meteorological Assimi-            ronment and Public Works, and the Com-
                                              paragraph (1), the Secretary—                           lation Data Ingest System.                             mittee on Energy and Natural Resources of
                                                (A) may continue to enter into agree-                   (3) STUDY REQUIRED.—                                 the Senate; and
                                              ments, including cooperative agreements,                  (A) IN GENERAL.—Not later than 1 year                   (B) the Committee on Transportation and
                                              with State mesonet programs for purposes of             after the date of the enactment of this Act,           Infrastructure, the Committee on Science,
                                              installing new stations or modifying existing           the Administrator shall initiate a study of            Space, and Technology, and the Committee
                                              stations;                                               the pilot program required by paragraph (1)            on Natural Resources of the House of Rep-
                                                (B) shall transfer ownership and all respon-          to evaluate the data generated by the net-             resentatives.
                                              sibilities for operation and maintenance of             work described in subsection (a) and the ap-           SEC. 512. GREAT LAKES ST. LAWRENCE SEAWAY
                                              new stations to the respective State mesonet            plications of that data to programs and ini-                       DEVELOPMENT CORPORATION.
                                              program for the State in which the moni-                tiatives described in paragraph (2)(B).                   (a) RENAMING THE SAINT LAWRENCE SEAWAY
                                              toring station is located on completion of in-            (B) ELEMENTS.—The study required by sub-             DEVELOPMENT CORPORATION.—The Act of
                                              stallation of the station; and                          paragraph (A) shall include an assessment              May 13, 1954 (33 U.S.C. 981 et seq.) is amend-
                                                (C) shall establish, in consultation with             of—                                                    ed—
                                              the Administrator, requirements and stand-                (i) the contribution of the soil moisture,             (1) in section 1 (33 U.S.C. 981), by striking
                                              ards for the installation of new stations and           snowpack, and other relevant data generated            ‘‘Saint Lawrence Seaway Development Cor-
                                              modification of existing stations to ensure             by the network described in subsection (a) to          poration’’ and inserting ‘‘Great Lakes St.
                                              seamless data integration into—                         weather, subseasonal and seasonal, and cli-            Lawrence Seaway Development Corpora-
                                                (i) the National Mesonet Program;                     mate forecasting products on the local, re-            tion’’; and
                                                (ii) the National Coordinated Soil Moisture           gional, and national levels;                             (2) in section 2(b) (33 U.S.C. 982(b)), by
                                              Network; and                                              (ii) the enhancements made to the Na-                striking ‘‘Saint Lawrence Seaway Develop-
                                                (iii) other relevant networks.                        tional Integrated Drought Information Sys-             ment Corporation’’ and inserting ‘‘Great
                                                (3) AUTHORIZATION OF APPROPRIATIONS.—                 tem, the National Water Model, and the                 Lakes St. Lawrence Seaway Development
                                              There is authorized to be appropriated to               United States Drought Monitor, and other               Corporation’’.
                                              carry out this subsection, in addition to any           relevant national modeling efforts, using                (b) REFERENCES.—Any reference to the
                                              other funds authorized to be appropriated for           data and derived data products generated by            Saint Lawrence Seaway Development Cor-
                                              the installation of a network of soil moisture          the network;                                           poration in any law, regulation, document,
                                              and plains snowpack monitoring stations or                (iii) the contribution of data generated by          record, Executive order, or other paper of the
                                              the modification of existing stations in the            the network to remote sensing products and             United States shall be deemed to be a ref-
                                              Upper Missouri River Basin, $7,000,000 for              approaches;                                            erence to the Great Lakes St. Lawrence Sea-
                                              each of fiscal years 2021 through 2025.                   (iv) the viability of the ownership and              way Development Corporation.
                                                                                                      operational structure of the network; and                 (c) TECHNICAL AND CONFORMING AMEND-
                                                (b) SOIL MOISTURE AND SNOWPACK MONI-                    (v) any other matters the Administrator              MENTS.—
                                              TORING PILOT PROGRAM.—                                  considers appropriate, in coordination with               (1) TITLE 5.—Section 5315 of title 5, United
                                                (1) IN GENERAL.—Not later      than 180 days          the Secretary, the Chief of the Natural Re-            States Code, is amended by striking ‘‘Saint
                                              after the date of the enactment of this Act,            sources Conservation Service, the Director of          Lawrence Seaway Development Corpora-
                                              the Administrator shall establish within the            the United States Geological Survey, and the           tion’’ and inserting ‘‘Great Lakes St. Law-
                                              National Mesonet Program a pilot program                Commissioner of Reclamation.                           rence Seaway Development Corporation’’.
                                              for the acquisition and use of data generated             (4) REPORT REQUIRED.—Not later than 4                  (2) TITLE 18.—Section 2282B of title 18,
                                              by the network described in subsection (a).             years after the date of the enactment of this          United States Code, is amended by striking
                                                (2) REQUIREMENTS.—In establishing the                 Act, the Administrator shall submit to the             ‘‘Saint Lawrence Seaway Development Cor-
                                              pilot program under paragraph (1), the Ad-              appropriate congressional committees a re-             poration’’ and inserting ‘‘Great Lakes St.
                                              ministrator shall—                                      port—                                                  Lawrence Seaway Development Corpora-
                                                (A) enter into agreements with State                    (A) setting forth the findings of the study          tion’’.
                                              mesonet programs in the Upper Missouri                  required by paragraph (3); and                            (3) INTERNAL REVENUE CODE.—Section
                                              River Basin to acquire data generated by the              (B) making recommendations based on                  9505(a)(2) of the Internal Revenue Code of
                                              network described in subsection (a) that—               those findings to improve weather, subsea-             1986 (26 U.S.C. 9505(a)(2)) is amended by strik-
                                                (i) are similar to the agreements in effect           sonal, seasonal, and climate monitoring na-            ing ‘‘Saint Lawrence Seaway Development
                                              as of the date of the enactment of this Act             tionally.                                              Corporation’’ and inserting ‘‘Great Lakes St.
                                              with States under the National Mesonet Pro-               (5) GOVERNMENT ACCOUNTABILITY OFFICE                 Lawrence Seaway Development Corpora-
                                              gram; and                                               AUDIT.—                                                tion’’.
                                                (ii) allow for sharing of data with other               (A) IN GENERAL.—Not later than 60 days                  (4) TITLE 31.—Section 9101(3)(K) of title 31,
                                              Federal agencies and with institutions en-              after the report required by paragraph (4) is          United States Code, is amended by striking
                                              gaged in federally supported research, in-              submitted, the Comptroller General of the              ‘‘Saint Lawrence Seaway Development Cor-
                                              cluding the United States Drought Monitor,              United States shall initiate an audit to               poration’’ and inserting ‘‘Great Lakes St.
                                              as appropriate and feasible;                            evaluate that report and determine wheth-              Lawrence Seaway Development Corpora-
                                                (B) in coordination with the Secretary, the           er—                                                    tion’’.
                                              Chief of the Natural Resources Conservation               (i) the Administrator, in conducting the               (5) WATER RESOURCES DEVELOPMENT ACT OF
                                              Service, the Director of the United States              pilot program under paragraph (1), has uti-            1986.—The Water Resources Development Act
                                              Geological Survey, and the Commissioner of              lized the relevant data generated by the net-          of 1986 (33 U.S.C. 2211 et seq.) is amended—
                                              Reclamation, gather data from the operation             work described in subsection (a) in the man-              (A) in section 206 (33 U.S.C. 2234), by strik-
                                              of the network to inform ongoing efforts of             ner most beneficial to the programs and ini-           ing ‘‘Saint Lawrence Seaway Development
                                              the National Oceanic and Atmospheric Ad-                tiatives described in paragraph (2)(B);                Corporation’’ and inserting ‘‘Great Lakes St.
                                              ministration in support of—                               (ii) the acquisition agreements entered              Lawrence Seaway Development Corpora-
                                                (i) the National Integrated Drought Infor-            into under paragraph (2)(A) with State                 tion’’;




SSpencer on DSK126QN23PROD with HOUSE
                                              mation System, including the National Co-               mesonet programs fully comply with the re-                (B) in section 210(a)(1) (33 U.S.C. 2238(a)(1)),
                                              ordinated Soil Moisture Network;                        quirements of that paragraph; and                      by striking ‘‘Saint Lawrence Seaway Devel-
                                                (ii) the United States Drought Monitor;                 (iii) the heads of other agencies, including         opment Corporation’’ and inserting ‘‘Great
                                                (iii) the National Water Model and other              the Secretary, the Chief of the Natural Re-            Lakes St. Lawrence Seaway Development
                                              relevant national modeling efforts;                     sources Conservation Service, the Director of          Corporation’’;
                                                (iv) validation, verification, and calibra-           the United States Geological Survey, and the              (C) in section 214(2)(B) (33 U.S.C. 2241(2)(B)),
                                              tion of satellite-based, in situ, and other re-         Commissioner of Reclamation, are utilizing             by striking ‘‘Saint Lawrence Seaway Devel-
                                              mote sensing activities and output products;            the data generated by the network to better            opment Corporation’’ and inserting ‘‘Great




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00070   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                 H6977
                                              Lakes St. Lawrence Seaway Development                     The SPEAKER pro tempore. Is there                    bus, Continuing Resolution, budget
                                              Corporation’’; and                                      objection to the request of the gen-                   deal, whatever the heck you want to
                                                 (D) in section 1132(b) (33 U.S.C. 2309(b)), by       tleman from Oregon?                                    call it.
                                              striking ‘‘Saint Lawrence Seaway Develop-                                                                        Now, the Committee on Appropria-
                                                                                                        There was no objection.
                                              ment Corporation’’ and inserting ‘‘Great
                                              Lakes St. Lawrence Seaway Development
                                                                                                        Mr. DEFAZIO. Madam Speaker, I                        tions in the Senate has raised con-
                                              Corporation’’ each place it appears.                    yield myself such time as I may con-                   cerns. Even though this does not count
                                                 (6) TITLE 46.—Title 46, United States Code,          sume.                                                  officially against allocations on an an-
                                              is amended—                                               Madam Speaker, legislation very                      nual basis, they are worried that some-
                                                 (A) in section 2109, by striking ‘‘Saint Law-        similar to this passed the House of                    how someone might look at them and
                                              rence Seaway Development Corporation’’                  Representatives unanimously earlier                    say, Well you have got all this other
                                              and inserting ‘‘Great Lakes St. Lawrence                this year. This bill will continue the bi-             money, so we are going to cut back on
                                              Seaway Development Corporation’’;                                                                              your regular amount of money. That is
                                                                                                      partisan tradition restarted by Chair-
                                                 (B) in section 8103(g), by striking ‘‘Saint
                                              Lawrence Seaway Development Corpora-                    man Shuster in 2014 of doing a Water                   not going to happen. This need is great.
                                              tion’’ and inserting ‘‘Great Lakes St. Law-             Resources Development Act every 2                        This is a huge bipartisan success
                                              rence Seaway Development Corporation’’;                 years. It is critical.                                 with agreement by harbors all around
                                                 (C) in section 8503(c), by striking ‘‘Saint            I am thankful to Ranking Member                      the country, large and small, emerging,
                                              Lawrence Seaway Development Corpora-                    GRAVES, Chairwoman GRACE NAPOLI-                       developed, energy ports. It is critical to
                                              tion’’ and inserting ‘‘Great Lakes St. Law-             TANO,    and Subcommittee Ranking                      the United States of America as a mar-
                                              rence Seaway Development Corporation’’;                 Member BRUCE WESTERMAN for their                       itime Nation that we get this done and
                                                 (D) in section 55112(a)(3), by striking ‘‘St.                                                               we begin to do the work on a daily
                                                                                                      hard work in developing the House
                                              Lawrence Seaway Development Corpora-                                                                           basis.
                                              tion’’ and inserting ‘‘Great Lakes St. Law-             version and helping us negotiate with
                                                                                                      the Senate. I also thank our Senate                      Of our 58 largest harbors, 35 percent
                                              rence Seaway Development Corporation’’;
                                                 (E) in section 55331(3), by striking ‘‘Saint         colleagues, Committee on Environment                   are at their authorized depths. That
                                              Lawrence Seaway Development Corpora-                    and Public Works Chairman JOHN BAR-                    means ships go around, that means
                                              tion’’ and inserting ‘‘Great Lakes St. Law-             RASSO, who has pushed very hard for                    ships have to pass too close to one an-
                                              rence Seaway Development Corporation’’;                 this bill, and Ranking Member TOM                      other in order to navigate restricted
                                              and                                                     CARPER, for their collaboration.                       channels. It means jetties that are be-
                                                 (F) in section 70032, by striking ‘‘Saint              Madam Speaker, this builds on the                    ginning to fail don’t get fixed, and
                                              Lawrence Seaway Development Corpora-                                                                           every year that they fail they become
                                              tion’’ and inserting ‘‘Great Lakes St. Law-
                                                                                                      success of H.R. 7575, which, as I said,
                                                                                                      passed the House of Representatives                    much, much more expensive to repair
                                              rence Seaway Development Corporation’’                                                                         until the point of total failure, at
                                              each place it appears.                                  earlier this year unanimously. It au-
                                                 (7) TITLE 49.—                                       thorizes construction of 46 reports of                 which point it becomes incredibly ex-
                                                 (A) IN GENERAL.—Title 49, United States              the Chief of the Corps of Engineers. It                pensive.
                                              Code, is amended—                                       is a record number of Chief’s Reports,                   Madam Speaker, should we access
                                                 (i) in section 110—                                  almost matching the number author-                     the harbor maintenance trust fund
                                                 (I) in the heading, by striking ‘‘Saint Law-         ized in 2016 and 2018.                                 over the next 5 years at $2 billion a
                                              rence Seaway Development Corporation’’
                                                                                                        Now, that would only be made pos-                    year, plus the expected income, we
                                              and inserting ‘‘Great Lakes St. Lawrence                                                                       could bring all of our ports up to a
                                              Seaway Development Corporation’’; and                   sible by the full utilization of the har-
                                                                                                      bor maintenance trust fund. For dec-                   state of good repair in 5 years. What
                                                 (II) in subsection (a), by striking ‘‘Saint                                                                 the Senate staff is insisting on would
                                              Lawrence Seaway Development Corpora-                    ades, since Ronald Reagan was Presi-
                                                                                                      dent, we have been assessing a tiny ad                 stretch that out for 20 years—and actu-
                                              tion’’ and inserting ‘‘Great Lakes St. Law-
                                              rence Seaway Development Corporation’’;                                                                        ally, would stretch it out longer, be-
                                                                                                      valorem tax on the value of goods and
                                              and                                                                                                            cause if you start doing things 18 years
                                                                                                      containers flowing through the ports
                                                 (ii) in section 6314(c)(2)(G), by striking                                                                  from now, they would have deterio-
                                                                                                      coming into the United States of
                                              ‘‘Saint Lawrence Seaway Development Cor-                                                                       rated even more and become more ex-
                                                                                                      America.
                                              poration’’ and inserting ‘‘Great Lakes St.                                                                     pensive. So they would, essentially, in-
                                              Lawrence Seaway Development Corpora-
                                                                                                        Despite the pressing need to dredge
                                                                                                                                                             definitely put off bringing our harbors
                                              tion’’.                                                 our harbors, to authorize steps to re-
                                                                                                                                                             to a state of good repair because of un-
                                                 (B) TABLE OF SECTIONS.—The table of sec-             pair jetties before they fail totally and
                                                                                                                                                             founded concern.
                                              tions for chapter 1 of subtitle I of title 49,          become much more expensive to re-                        Madam Speaker, I am hopeful that
                                              United States Code, is amended by amending              place, for many years Congress refused                 common sense will prevail, if there is
                                              the item relating to section 110 to read as             to spend that full amount of money.
                                              follows:                                                                                                       any such thing on the other side of
                                                                                                      There is now around $10 billion col-                   Capitol Hill.
                                              ‘‘110. Great Lakes St. Lawrence Seaway De-              lected in taxes from the American peo-
                                                              velopment Corporation.’’.                                                                        I want to go back to thanking mem-
                                                                                                      ple for a specific purpose for which it                bers of our committee and the staff
                                              SEC. 513. DETERMINATION OF BUDGETARY EF-
                                                         FECTS.                                       has not been spent.                                    who did great work on this bill. It is an
                                                The budgetary effects of this Act, for the              I started working on this with Bud                   excellent bill.
                                              purpose of complying with the Statutory                 Shuster—not Bill—Bud Shuster, his                        It also deals with inland waterways
                                              Pay-As-You-Go Act of 2010, shall be deter-              dad, back in 1996 to access the full                   on a cost-share basis. It deals with
                                              mined by reference to the latest statement              amount of the harbor maintenance                       building in resilience to deal with cli-
                                              titled ‘‘Budgetary Effects of PAYGO Legisla-            trust fund. It got out of that com-
                                              tion’’ for this Act, submitted for printing in
                                                                                                                                                             mate change—even if you don’t believe
                                                                                                      mittee twice under Chairman Shuster.                   in it—and will use natural systems as
                                              the Congressional Record by the Chairman of
                                              the House Budget Committee, provided that               He was quite amazed it came out                        much as possible for these needs.
                                              such statement has been submitted prior to              unanimously, including Freedom Cau-                      Chairwoman GRACE NAPOLITANO, who
                                              the vote on passage.                                    cus members and others, but Paul                       did not travel here today, was dogged
                                                The SPEAKER pro tempore. Pursu-                       Ryan saw fit to strip it from the bill                 in her support for the maintenance
                                              ant to the rule, the gentleman from Or-                 because he didn’t think that we should                 needs and advocacy for her large har-
                                              egon (Mr. DEFAZIO) and the gentleman                    maintain our harbors and our ports as                  bors. And ultimately, we came to an
                                              from Missouri (Mr. GRAVES) each will                    a maritime Nation. I guess being in-                   agreement, as I said, between all sizes
                                              control 20 minutes.                                     land, he didn’t think that was so im-                  of harbors around the country.
                                                The Chair recognizes the gentleman                    portant.                                                 Madam Speaker, I also thank my
                                              from Oregon.                                              We now have finally gotten to that                   ranking member, SAM GRAVES. He




SSpencer on DSK126QN23PROD with HOUSE
                                                               GENERAL LEAVE                          point where we are going to access the                 couldn’t have been a better partner in
                                                Mr. DEFAZIO. Madam Speaker, I ask                     funds. There is one tiny remaining                     helping us deal with the other side of
                                              unanimous consent that all Members                      problem—since the Senate seems to be                   Capitol Hill, and Mr. WESTERMAN for
                                              may have 5 legislative days within                      totally incapable of passing any indi-                 his steadfast support and importance
                                              which to revise and extend their re-                    vidual pieces of legislation and doing                 to the final bill. Today’s success would
                                              marks, including extraneous material                    nothing individually except judges—we                  not have been possible without their
                                              on S. 1811, as amended.                                 are seeking to attach this to the Omni-                great work.



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00071   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.013   H08DEPT1
                                              H6978                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                                 There are a number of members of                     efits, are considered in the formulation of fu-        populations or sub-systems. Further, this title
                                              the committee who were particularly                     ture projects.                                         directs the Corps to examine and report back
                                              crucial:      DEBBIE      MUCARSEL-POWELL,                  Title 1 of WRDA 2020 ensures that the              on various Corps internal processes and as-
                                              ABBY FINKENAUER, HARLEY ROUDA,                          Corps operates and executes projects to meet           sets to identify additional opportunities for
                                              CONOR LAMB, ANGIE CRAIG, CHRIS                          our Nation’s ever evolving 21st century needs.         Corps expertise and improvement in work effi-
                                              PAPPAS, ANTONIO DELGADO, LIZZIE                         This title supports our transportation infrastruc-     cacy.
                                              FLETCHER, GREG STANTON, and SHARICE                     ture and ensures the efficient flow of domestic           Title 3 addresses ongoing Corps operations
                                              DAVIDS, all members of the committee                    and international commerce by reinstating the          and opportunities to ensure efficient project
                                              who contributed significantly to this.                  Federal commitment to our ports, harbors, and          delivery as well as remove outdated or dupli-
                                                 And also, we did lose the language to                inland waterways. It builds on the CARES Act           cative Corps authorizations. Continuing in the
                                              reauthorize the Clean Water State Re-                   (Pub. L. 116–136) by unlocking funds that              tradition of the last three WRDAs, WRDA
                                              volving Fund, which hasn’t been reau-                   have already been collected from shippers for          2020 directs the Corps to identify approxi-
                                              thorized since 1987. I kind of thought it               the purpose of harbor deepening and mainte-            mately $10 billion in antiquated construction
                                              was time but, apparently, that is right                 nance, and that have remained unspent, in the          authorizations that can be deauthorized, which
                                              now not on the radar of some people.                    Harbor Maintenance Trust Fund (HMTF) while             is roughly equivalent to the cost of the new
                                                 Madam Speaker, the Water Resources De-               there are unmet operation and maintenance              Chiefs Reports authorized by this legislation.
                                              velopment Act (WRDA) is legislation that is             needs at ports and harbors. In addition, this             In addition, the revisions and updates to
                                              essential to everyday American life-supporting          title establishes a new authorization framework        projects in Title 3, on advisement from the
                                              jobs and our economy, protecting American               for the allocation of harbor maintenance funds         Corps, will keep those projects on track for de-
                                              lives and property, and restoring and pro-              to ensure equitable expenditures to meet the           livery and maintain the effectiveness and effi-
                                              tecting our vital natural resources. The Water          ongoing needs of the Nation’s largest ports,           ciency of these Federal investments. This title
                                              Resources Development Act of 2020 (WRDA                 Commercial Strategic Seaports, Great Lakes             also makes modifications to existing programs
                                              2020) modernizes and invests in our water re-           Harbors, and emerging harbors. Title 1 also            within the Corps to include a wider range of
                                              sources infrastructure by: (1) authorizing crit-        addresses critical needs to modernize our              eligible regions for those programs and pro-
                                              ical, locally driven U.S. Army Corps of Engi-           Federal inland waterway system by author-              vide them with sufficient authorization levels to
                                              neers (Corps) projects and studies; (2) expe-           izing additional funds from the General Fund           achieve their central purposes.
                                              diting the delivery of future projects; (3) in-         of the Treasury towards the construction of
                                              creasing water storage and supply; (4) pre-                                                                       Further, Title 3 deauthorizes or transfers, in
                                                                                                      projects on the Inland Waterway System,
                                              venting, managing, and eradicating invasive                                                                    part or in whole, certain projects which are no
                                                                                                      which handles approximately half of all inland
                                              species that reduce and degrade our water re-                                                                  longer within the mission of the Corps or are
                                                                                                      waterway freight and one-twelfth of all national
                                              sources infrastructure and the environment;                                                                    otherwise better suited as returned to the lo-
                                                                                                      freight.
                                              (5) building resiliency to increasing storm and             Further, Title 1 of WRDA 2020 ensures that         calities. These actions maintain Corps de-
                                              flooding risks: (6) increasing community and            future water resources development projects            pendability and its relationships with non-Fed-
                                              Tribal involvement and engagement; and (7)              are designed and built with greater resiliency         eral sponsors and stakeholders, while alle-
                                              addressing communities with affordability con-          to address the needs of the next century. For          viating superfluous lands or projects that
                                              cerns. WRDA 2020 strengthens our Nation’s               example, this title directs the Corps to con-          should be returned to states and localities and
                                              security and economic competitiveness by                sider nature-based and natural features while          removed from Corps responsibilities.
                                              deepening our ports and harbors, maintaining            developing projects, and advocates for innova-            Title 4 of WRDA 2020 affirms the Federal
                                              our inland waterways, and providing protection          tion that ensures the resiliency and longevity         commitment to delivering water resources
                                              from dangerous flooding, while remaining                of Corps construction. Similarly, this title rec-      projects and the continued improvement of
                                              committed to economically and environ-                  ognizes the needs of communities that are              American water infrastructure. Again, this title
                                              mentally responsible development.                       currently facing repeat flooding events by pro-        authorizes 46 Corps projects to move to con-
                                                 In WRDA bills, Congress authorizes studies           viding critical assistance for the expedited con-      struction and makes changes to projects cur-
                                              and projects encompassing the key missions              sideration of permanent measures to reduce             rently underway to guarantee their accuracy
                                              of the Corps, including supporting coastal and          local flooding risks.                                  and long-term value. Projects authorized
                                              inland waterways infrastructure, effective and              Moreover, Title 1 makes policy reforms to          under WRDA 2020 will sustain jobs and our
                                              targeted flood protection, environmental res-           promote stronger local-level partnerships, de-         economic competitiveness by maintaining the
                                              toration, storm damage prevention, and                  cisionmaking, and effective, transparent               flow of goods through our navigational chan-
                                              proactive water supply initiatives. Each of the         project development and implementation that            nels and protecting American lives, land, and
                                              46 completed feasibility study reports of the           will overall improve water infrastructure devel-       assets from flood or storm waters. The
                                              Chief of Engineers (Chiefs Reports) authorized          opment. Other provisions within this title en-         projects will restore and enhance our natural
                                              by WRDA 2020 were locally driven and cost-              sure the protection of all communities through         resources, ecosystems and environment, and
                                              shared, rigorously studied, and determined by           wider consideration of project benefits and            prepare communities for increasingly wet or
                                              the Corps to be economically justified, tech-           greater flexibility and support for populations        dry conditions. These essential projects will
                                              nically sound, and environmentally acceptable.          with affordability concerns. Title 1 also helps        positively impact populations in all regions of
                                                 Since 2014, Congress has resumed the tra-            communities respond faster to natural disas-           the country and build smarter, more resilient
                                              dition of biennial consideration of WRDAs, and          ters, improves the safety of our dams and lev-         infrastructure for the benefit of generations to
                                              WRDA 2020 continues to deliver new authori-             ees, addresses necessary updates to aging in-          come.
                                              ties on a predictable authorization cycle to            frastructure, and supports critical work against          Title 5 of this bill makes several changes to
                                              meet the water resource needs of local com-             invasive species and harmful algal blooms.             Corps and other Federal agency authorities
                                              munities and to provide appropriate oversight           Lastly, this title recognizes the increasing role      related to the control of invasive species or for
                                              of, and policy direction to, the Administration         the Corps plays in addressing the water sup-           other purposes. Invasive species have a dev-
                                              and the Corps. The transformative nature of             ply and water conservation needs of local and          astating impact on our Nation’s water infra-
                                              the last three WRDA bills has provided the              rural communities.                                     structure, as well as on our water supply. In-
                                              Corps and the non-Federal interests with new                Title 2 of WRDA 2020 ensures continuity in         creasingly, the Corps is required to partner
                                              opportunities to advance projects more quickly          addressing our water resources development             with other Federal agencies to control the
                                              and with greater effectiveness. WRDA 2020               needs. It authorizes feasibility studies for the       spread of invasive species, both on land and
                                              builds on these changes by ensuring that fu-            development of future projects, while ensuring         in the aquatic environment. The changes
                                              ture water resources development projects are           that studies currently underway are completed          made by this title include the creation of new
                                              developed in a resilient and more sustainable           expeditiously. Title 2 also makes necessary            pilot programs to address invasive species
                                              manner, by targeting increased Federal assist-          adjustments to existing studies or projects to         such as Asian Carp, elodea, and quagga mus-




SSpencer on DSK126QN23PROD with HOUSE
                                              ance to rural and economically-disadvantaged            ensure they are forward-looking and encom-             sels, as well as noxious weeds. This title also
                                              communities and Tribes that have seen chal-             pass as many potential benefits to the local-          retains the traditional roles of the Corps and
                                              lenges in implementing critical water resources         ities as practicable. In addition, this title au-      other Federal agencies in controlling the
                                              infrastructure, and by modernizing the process          thorizes the analysis of regional or watershed-        spread or managing and reducing existing
                                              for project development to ensure that all              based systems which facilitates cohesive               invasive species.
                                              project benefits, including economical, re-             projects and greater end results for the sys-             The managers of the U.S. House of Rep-
                                              gional, environmental, and other societal ben-          tems without inadvertently segmenting out              resentative and the U.S. Senate for WRDA



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00072   Fmt 4634   Sfmt 9920   E:\CR\FM\K08DE7.044   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                       H6979
                                              2020 (‘‘the Managers’’) also highlight the fol-         alike. The Managers intend this authority to be        to Congress publicly available on the internet
                                              lowing sections of this legislation and other           used in conjunction with the Gulf Coast Re-            and is directed to submit the report to Con-
                                              matters related to the Corps:                           gional Dredge Demonstration Program created            gress along with its annual report pursuant to
                                                  Section 109 addresses the critical need to          in P.L. 116–94, the Further Consolidated Ap-           section 7001 of Water Resources Reform and
                                              modernize our Federal Inland Waterway Sys-              propriations Act, 2020.                                Development Act of 2014, P.L. 113–121
                                              tem. This section authorizes additional funds              Section 161 makes changes to the study              (WRRDA 2014).
                                              from the General Fund of the Treasury to-               process pursuant to section 203 of WRDA                   The Managers intend for the Corps to expe-
                                              wards the construction of authorized inland             1986. As required by this section, this new            ditiously develop implementation guidance for
                                              waterways projects. The Managers have au-               policy does not apply to any project being au-         the provisions contained in WRDA 2020, as
                                              thorized this change to the current 50–50 cost          thorized by this Act. Further these changes do         well as provisions from prior WRDAs that have
                                              share for inland projects to resolve the back-          not apply to any feasibility study submitted to        yet to be developed. Section 223 of WRDA
                                              log in these critical projects, and intend that         the Corps during the one-year period prior to          2020 directs the Corps to expeditiously com-
                                              any inland project that received construction           the date of enactment of this section, such as         plete these actions, and consistent with sec-
                                              assistance prior to fiscal year 2030 utilize the        the Raymondville Drain Project, Lower Rio              tion 1105 of WRDA 2018, to involve stake-
                                              new 75–25 cost share authorized by this sec-            Grande Basin, Texas.                                   holders in the development of guidance mate-
                                              tion through completion of the project. The                Subsection 201(b) states that the Corps is          rials. In addition, the Managers direct the Sec-
                                              Managers also expect that this additional sup-          to consider any study carried out by the Corps         retary to directly engage and consult with, and
                                              port will be prioritized for those projects identi-     for Port Arthur and Orange County, Texas,              provide briefings for, the Committee on Trans-
                                              fied by inland users as most essential in the           flood control project, to be a continuation of         portation and Infrastructure and the Committee
                                              20-year capital development plan required               the study authorized under Sabine Pass to              on Environment on Public Works on these ac-
                                              under section 302(d) of WRDA 1986, including            Galveston Bay, Texas. While subsection (a)             tions.
                                              the Upper Ohio navigation system, the Navi-             explicitly authorizes a study for Port Arthur             Section 229 amends section 1104(b) of
                                              gation and Ecosystem Sustainability Program             and Orange County, Texas, the Managers in-             WRDA 2018 to require that the Corps provide
                                              for the Upper Mississippi River, and the Three          tend that nothing in subsection 201(b) will            the Committee on Environment and Public
                                              Rivers project in Southeast Arkansas. It is the         slow down the construction of the project for          Works of the Senate and the Committee on
                                              intention of the Managers that current                  Sabine Pass to Galveston Bay, Texas.                   Transportation and Infrastructure of the House
                                              prioritization plans be followed by the Corps in           Section 213 directs the Corps to conduct a          of Representatives an annual written update
                                              its funding of inland waterway projects.                comprehensive study of the Lower Mississippi           on the Corps’ implementation of non-Federal
                                                  Section 112 directs the Corps to ensure             River. The Managers note that the Mississippi          outreach requirements associated with devel-
                                              meaningful participation and consultation by            River has been at flood stage at record length         opment of section 7001 annual reports. This
                                              economically disadvantaged communities and              and frequency in recent years. The Managers            section also requires that the Corps issue
                                              Indian Tribes in the development of future              intend this study to provide reconsideration of        guidance for the uniform implementation of the
                                              water resources projects. During formulation of         the operations of existing assets by operating         7001 process by Corps districts and ensure
                                              WRDA 2020, the Managers heard concerns                  structures throughout the Lower Mississippi            annual compliance with that guidance. The
                                              from economically disadvantaged communities             River holistically and, potentially, for multiple      Managers continue to be concerned with the
                                              and Indian Tribes of a lack of transparency             purposes per asset, as well as identifying new         agency’s ability to consistently implement
                                              and meaningful communication with these                 projects and utilizing existing Federal and non-       these policies nationwide.
                                              communities. Managers expect that contin-               Federal assets, such as river reintroduction              Section 310 clarifies that any Federal funds
                                              uous commitment to, and review of, Corps                projects, new or existing reservoirs, water sup-       used to carry out construction of the McClel-
                                              policies surrounding community engagement               ply projects, or other measures. In completing         lan-Kerr Arkansas River Navigation System
                                              and tribal consultation will minimize adverse           the study, the Managers intend for the Corps           (MKARNS) are considered as initiating con-
                                              impacts to these populations, including detri-          to collaborate with all levels of government, as       struction of the project such that future funds
                                              mental impacts to their health, property, and           well as with non-governmental entities to im-          will not require a new start designation. With
                                              livelihoods. It is the Managers’ intention that         prove the management of one of the largest             initial construction of the MKARNS completed
                                              the Corps complete reviews and make adjust-             watersheds in the world.                               50 years ago, modernization of the entire
                                              ments, if warranted, to procedures expedi-                 Section 216 includes studies for the Lower          channel was authorized by Congress in 2003
                                              tiously to ameliorate concerns and avoid con-           and Upper Missouri River. With a General In-           and funds were subsequently provided in
                                              flict with existing and future water resources          vestigations study of the Lower Missouri River         2004. Since that time, the 12-foot deepening
                                              projects.                                               Basin already underway, the Managers intend            project has stalled, but this section will allow
                                                  Section 125 renews the Congressional com-           this section to build off this existing authority      construction of the project to resume without
                                              mitment to beneficial use of dredged material.          and to expeditiously review both a comprehen-          the requirement to obtain a New Start, a re-
                                              While carrying out the beneficial use of                sive plan and site-specific solutions to combat        quirement not contemplated when the deep-
                                              dredged material pilot program pursuant to              flooding in communities across the Lower Mis-          ening project was authorized and funded. This
                                              section 1122 of WRDA 2016, the Corps is di-             souri River Basin. While this Act specifically         section will ensure the project is formally con-
                                              rected to carry out at least one project utilizing      and preemptively waives 3x3x3 requirements,            sidered as a project resumption for budgetary
                                              thin layer placement of dredged fine and                the Managers strongly encourage the Corps to           and appropriations purposes.
                                              coarse grain sediment. This demonstration               complete its studies as expeditiously as pos-             Section 348 allows a local government enti-
                                              program is also authorized to be expanded to            sible.                                                 ty, such as a city, with existing water supply
                                              apply to recovering lost storage capacity in               Section 222 requires the Corps to issue an          storage in a Federal or non-Federal hydro-
                                              reservoirs due to sediment accumulation, if the         annual report that identifies all authorized           power lake within the Arkansas Basin, to ac-
                                              project meets the other criteria within the pro-        studies or projects meeting certain criteria, in-      cess that water supply at a cost of not more
                                              gram. The Corps is directed to carry out at             cluding local support and the Corps’ capability        than 110 percent of initial principal cost for the
                                              least one project to recover lost storage ca-           for executing the work. The Managers expect            acre-feet sought for a new covered contract
                                              pacity under the program as well. With this             this annual report will provide greater trans-         for that lake. This section makes clear that the
                                              section, Managers expect the Corps to select            parency in the Administration’s development of         Managers do not expect the Corps to under-
                                              projects that encompass a wide range of re-             both its annual budget and its project selection       take any formal reallocation process. Rather,
                                              gional areas, economic status, and utilization          process.                                               the Managers expect that the Corps will work
                                              methods.                                                   In completing this report, the Corps must           only with a local government entity that cur-
                                                  Additionally, this section further encourages       describe specific benefits for each authorized         rently holds the rights to access water supply
                                              the Corps to coordinate planning for the de-            study and authorized water resources devel-            storage.
                                              ployment of Federal and non-Federal dredges.            opment project included in the annual report.             Section 351 allows the Corps, at the request




SSpencer on DSK126QN23PROD with HOUSE
                                              In sequencing dredging work to benefit mul-             This section also requires the Secretary to in-        of a non-Federal interest, to renegotiate the
                                              tiple mission sets and providing consistent             clude an appendix in the annual report that            terms and conditions of deferred payment
                                              navigational certainty, especially in areas of          lists any submitted proposals that were not in-        agreements under Section 103(k) of WRDA
                                              high maritime traffic in our Nation’s harbors           cluded in the annual report and a description          1986 and to accept, without interest, the pre-
                                              and waterways, the Managers believe proper              of why the Corps determined that those pro-            payment of non-Federal contributions. The
                                              implementation of this program will benefit the         posals did not meet the criteria for inclusion.        Managers anticipate that the non-Federal
                                              American economy and restoration efforts                The Corps shall also make the annual report            sponsors of the West Bank and Vicinity, Lake



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00073   Fmt 4634   Sfmt 9920   E:\CR\FM\A08DE7.015   H08DEPT1
                                              H6980                                             CONGRESSIONAL RECORD — HOUSE                                                     December 8, 2020
                                              Pontchartrain and Vicinity, and Southeast Lou-          consideration of the bill as to provisions that          Madam Speaker, WRDA 2020 author-
                                              isiana Urban Flood Damage Reduction                     fall within the Rule X jurisdiction of the             izes—and, again, as has been pointed
                                              Projects are expected to seek relief under this         Committee on Natural Resources.                        out—60      critical   water    resource
                                                                                                        The Committee on Natural Resources
                                              section in order to continue large-scale invest-        takes this action with the mutual under-
                                                                                                                                                             projects. This is the most authoriza-
                                              ments to support resiliency in both their infra-        standing that, in doing so, we do not waive            tions in recent history. These projects
                                              structure and regional ecosystems.                      any jurisdiction over the subject matter con-          are going to strengthen our global
                                                 Section 401 authorizes 46 Chief’s Reports,           tained in this or similar legislation, and that        competitiveness, they are going to
                                              including a project for navigation improve-             the Committee will be appropriately con-               grow the economy, they are going to
                                              ments for the Port of Nome in Nome, Alaska.             sulted and involved as the bill or similar leg-        provide flood protection for our com-
                                              Nome will be America’s first Arctic deep draft          islation moves forward so that we may ad-              munities, they are going to safeguard
                                              port, enhancing our strategic and economic              dress any remaining issues within our juris-           the environment, and create jobs.
                                                                                                      diction. Our Committee also reserves the
                                              competitiveness in the Arctic region. The Man-                                                                   Additionally, WRDA is fiscally re-
                                                                                                      right to seek appointment of conferees to
                                              agers note the complementary and important              any House-Senate conference involving this             sponsible and deauthorizes old projects
                                              role that modest improvements at Port Clar-             or similar legislation.                                to fully offset new authorizations. It
                                              ence/Point Spencer can play relative to the               Thank you for agreeing to include our ex-            advances inland waterway improve-
                                              project at Nome, Alaska, and for safe Arctic            change of letters in the Congressional                 ments by adjusting the Inland Water-
                                              transportation generally, and therefore, the            Record. I appreciate your cooperation re-              ways Trust Fund cost-share; it includes
                                              Managers encourage the Corps of Engineers               garding this legislation and look forward to           important considerations and set-
                                              to expedite its consideration of the use of Sec-        continuing to work with you as this measure            asides for rural communities; and it
                                                                                                      moves through the legislative process.
                                              tion 107 Continuing Authorities Program fund-                                                                  provides relief to communities, such as
                                                                                                            Sincerely,
                                              ing to help install and make operational the                                 RAÚL M. GRIJALVA,                those in my home State of Missouri
                                              two 30-ton and one 60-ton industrial grade                 Chair, House Natural Resources Committee.           that have experienced repetitive losses
                                              buoy systems at Port Clarence to serve mari-                                                                   as a result of flood events.
                                              time safety needs for the Bering Strait as well              COMMITTEE ON TRANSPORTATION AND                     Madam Speaker, I thank Chairman
                                              as the greater Arctic region. The Managers                     INFRASTRUCTURE,                                 DEFAZIO, Chair NAPOLITANO, Ranking
                                              also encourage the potential use of unobli-                      U.S. HOUSE OF REPRESENTATIVES                 Member WESTERMAN, and committee
                                              gated prior-year funds to facilitate the imple-                     Washington, DC, December 4, 2020.          members and staff on both sides for
                                              mentation of the mooring buoy project as soon           Hon. RAÚL GRIJALVA,
                                                                                                                                                             their efforts in this very important
                                                                                                      Chair, Committee on Natural Resources,
                                              as possible and note that the Corps was in-             House of Representatives, Washington, DC.              piece of legislation.
                                              strumental in completing a similar project for            DEAR CHAIR GRIJALVA: Thank you for your                On the Republican staff, I particu-
                                              the placement and use of commercial-grade               letter regarding S. 1811, A bill to make tech-         larly want to thank the Subcommittee
                                              mooring buoys in the Columbia River.                    nical corrections to the America’s Water In-           on Water Resources and Environment
                                                 Various sections under Title 5 of WRDA               frastructure Act of 2018, and for other pur-           staff: Ian Bennitt, Jon Pawlow, and
                                              2020 protect American assets and resources              poses. I appreciate your decision to waive             Victor Sarmiento. These folks have
                                              by working to prevent the spread and promote            formal consideration of the bill.                      worked over weekends, they have
                                              the eradication of certain invasive species.              I agree that the Committee on Natural Re-
                                                                                                                                                             worked over the recent holidays to
                                                                                                      sources has valid jurisdictional claims to
                                              The Managers intend that work conducted as              certain provisions in this important legisla-          help ensure that our priorities were in-
                                              a result of this Title remain within the jurisdic-      tion, and I further agree that by forgoing             tact, and we could move this bill prior
                                              tion of the involved agencies and encourage a           formal consideration of the bill, the Com-             to the end of Congress—at least this
                                              collaborative approach to solutions that allows         mittee on Natural Resources is not waiving             year’s Congress.
                                              each agency to utilize its expertise. Specifi-          any jurisdiction over any relevant subject               I thank my general counsel, Corey
                                              cally, under section 508, the Managers intend           matter. Additionally, I will support the ap-           Cooke, Tara Hupman, Tyler Micheletti,
                                              that, for those authorities which address mur-          pointment of conferees from the Committee              Justin Harclerode, Abby Camp, Nick
                                              der hornets as an invasive species, the De-             on Natural Resources should a House-Senate
                                                                                                                                                             Christensen, Jack Ruddy, and my full
                                                                                                      conference be convened on this legislation.
                                              partment of the Interior shall work in conjunc-         Finally, this exchange of letters will be in-          committee staff director, Paul Sass,
                                              tion with the Department of Agriculture.                cluded in the Congressional Record when the            for their hard work on this and getting
                                                 The Managers believe lessees of rec-                 bill is considered on the floor.                       it done.
                                              reational and other facilities at water resource          Thank you again, and I look forward to                 Madam Speaker, I strongly urge my
                                              development projects should have more pre-              continuing to work collaboratively with the            colleagues to support this bill, S. 1811,
                                              dictability and stability with regard to their re-      Committee on Natural Resources on this im-             and I reserve the balance of my time.
                                              spective lease agreements with the Corps.               portant issue.                                           Mr. DEFAZIO. Madam Speaker, I in-
                                              The Managers are, in conjunction with enact-                   Sincerely,
                                                                                                                                                             clude in the RECORD a list of the orga-
                                                                                                                            PETER A. DEFAZIO,
                                              ment of WRDA 2020, requesting the U.S.                                                                         nizations supporting S. 1811, the Water
                                                                                                                                             Chair.
                                              Government Accountability Office (GAO) to                                                                      Resources Development Act of 2020.
                                              analyze Corps of Engineers policies related to            Mr. GRAVES of Missouri. Madam
                                                                                                                                                             LIST OF ORGANIZATIONS SUPPORTING S. 1811,
                                              the length of commercial concessionaire con-            Speaker, I yield myself such time as I
                                                                                                                                                               THE WATER RESOURCES DEVELOPMENT ACT
                                              tracts. In the interim, the Managers believe            may consume.                                             OF 2020
                                              that the Corps should consider the use of con-            Madam Speaker, some of what I say
                                                                                                                                                               American Association of Port Authorities,
                                              cessionaire lease agreements for a period of            today is going to be a little redundant,               American Farm Bureau Federation, Amer-
                                              not less than 25 years and not more than 50             but I think it does bear repeating.                    ican Great Lakes Port Association, Amer-
                                              years, unless otherwise agreed to by the les-             I do stand here in strong support of                 ican Petroleum Institute, American Road &
                                              see. This effective tool will provide greater           the amended version of S. 1811, which is               Transportation Builders Association, Amer-
                                                                                                      the Water Resources Development Act                    ican Shore and Beach Preservation Associa-
                                              predictability and stability in the use of Corps
                                                                                                      2020 or WRDA. The bill represents a bi-                tion, American Society of Civil Engineers,
                                              lands by the lessee.                                                                                           American Waterways Operators, Associated
                                                 Madam Speaker, I reserve the bal-                    partisan, bicameral compromise. It re-
                                                                                                                                                             General Contractors of America, Association
                                              ance of my time.                                        news our commitment to regularly
                                                                                                                                                             of State Floodplain Managers, California As-
                                                       HOUSE OF REPRESENTATIVES,                      consider water resources infrastructure                sociation of Port Authorities, Coastal States
                                                  COMMITTEE ON NATURAL RESOURCES,                     legislation.                                           Organization, Everglades Foundation, Flor-
                                                          Washington, DC, December 4, 2020.             And I remind my House colleagues                     ida Department of Environmental Protec-
                                              Hon. PETER A. DEFAZIO,                                  and reiterate what the chairman said,                  tion, Grain and Feed Association of Illinois,
                                              Chair, Committee on Transportation and Infra-           we unanimously passed a bipartisan                     Growmark, Healing Our Waters-Great Lakes




SSpencer on DSK126QN23PROD with HOUSE
                                                  structure,                                          WRDA bill out of the Committee on                      Coalition, Illinois Corn Growers Association,
                                              House of Representatives, Washington, DC.               Transportation and Infrastructure, and                 Illinois Farm Bureau, Illinois Fertilizer and
                                                DEAR CHAIR DEFAZIO: In recognition of the                                                                    Chemical Association, Illinois Soybean
                                                                                                      we unanimously passed it on the floor
                                              goal of expediting consideration of S. 1811,                                                                   Growers, International Federation of Profes-
                                              ‘‘A bill to make technical corrections to the           of the House in July. And now, 5                       sional and Technical Engineers, Interstate
                                              America’s Water Infrastructure Act of 2018,             months later, we hope to do the very                   Council on Water Policy, Metropolitan
                                              and for other purposes’’ the Committee on               same thing after successfully negoti-                  Water District of Southern California, Na-
                                              Natural Resources agrees to waive formal                ating with the Senate.                                 tional Association of Counties, National




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00074   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.016   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                  H6981
                                              Conference of State Legislatures, National                President Dwight David Eisenhower                    final Water Resources Development
                                              Corn Growers Association, National Associa-             understood that this seaway is the                     Act for 2020. This is a wonderful bill.
                                              tion of Flood and Stormwater Management                 shortest distance to Europe, and we                      We have $10 billion in new water in-
                                              Agencies, National Grain and Feed Associa-
                                                                                                      must remember that today.                              frastructure authorizations in this bill.
                                              tion, National Governors Association, Na-
                                              tional League of Cities, National Marine                  Madam Speaker, I urge support for                    It authorizes all of the pending Chief’s
                                              Manufacturers Association, National Parks               this bipartisan bill.                                  reports. That includes two very impor-
                                              Conservation Association, National Stone,                                 b 1415                               tant flood risk management projects in
                                              Sand, and Gravel Association, National                                                                         my district, which has been severely
                                              Water Resources Association, National                     Mr. GRAVES of Missouri. Madam                        harmed by persistent flooding in recent
                                              Water Supply Alliance, National Wildlife                Speaker, I yield 3 minutes to the gen-                 years, as evidenced by the damage from
                                              Federation, Northwest Seaport Alliance, Or-             tleman       from      Arkansas     (Mr.               Hurricanes Irma and Maria.
                                              egon Public Ports Association, Pacific                  WESTERMAN), the ranking member of                        I would like to take this opportunity
                                              Northwest Waterways Association, Port of                the Subcommittee on Water Resources
                                              Los Angeles, Port of Redwood City, Portland
                                                                                                                                                             to remind the Army Corps that it may
                                                                                                      and the Environment.                                   fund the construction of these projects
                                              Cement Association, The Fertilizer Insti-
                                              tute, The Nature Conservancy, Transpor-
                                                                                                        Mr. WESTERMAN. Madam Speaker,                        out of remaining funds provided in the
                                              tation Trades, Dept., AFL–CIO, United Asso-             I thank the distinguished ranking                      Bipartisan Budget Act of 2018 and that
                                              ciation of Union Plumbers and Pipefitters,              member from Missouri for his leader-                   construction of such projects in the
                                              United Steelworkers, U.S. Chamber of Com-               ship on continuing the biennial consid-                Virgin Islands, as well as in Puerto
                                              merce, U.S. Conference of Mayors, Water-                eration for the Water Resources Devel-                 Rico, with funds provided under that
                                              ways Council, Inc.                                      opment Act.                                            act shall be conducted at full Federal
                                                Mr. DEFAZIO. Madam Speaker, I                           Today, I rise in strong support of S.                expense.
                                              yield 2 minutes to the gentlewoman                      1811, the Water Resources Development                    This bill also contains a long-sought
                                              from Ohio (Ms. KAPTUR), the chair of                    Act of 2020. WRDA 2020 will strengthen                 reauthorization of projects for naviga-
                                              the Energy and Water Development,                       our Nation’s ability to withstand se-                  tion in the harbors of St. Thomas and
                                              and Related Agencies.                                   vere weather and flood events, author-                 Christiansted, St. Croix. The reauthor-
                                                Ms. KAPTUR. Madam Speaker, I                          ize the construction of key water infra-               ization of these projects for navigation
                                              thank Chair DEFAZIO.                                    structure projects throughout the Na-                  will provide the harbors access to Fed-
                                                Madam Speaker, I rise in strong sup-                  tion, create jobs here at home, and di-                eral resources for maintenance dredg-
                                              port of the Water Resources Develop-                    rectly contribute to our economic                      ing and improvements to navigational
                                              ment Act.                                               growth and competitiveness.                            systems, which will allow them to ac-
                                                There is no question that Chairman                      All 60 project authorizations con-                   commodate more and larger cruise
                                              DEFAZIO and Chairwoman NAPOLITANO                       tained in WRDA 2020 were proposed by                   ships over the long term, thereby bet-
                                              have worked tirelessly over the last                    non-Federal sponsors and underwent a                   ter competing in a competitive Carib-
                                              year—and probably longer—to get this                    rigorous planning process before con-                  bean market. This is a very strong bill
                                              bill to the finish line. This bill delivers             gressional review.                                     for the ports and harbors of the United
                                              for our Nation’s crumbling water infra-                   This WRDA bill focuses on building                   States.
                                              structure.                                              more resilient infrastructure, increas-                  Lastly, this bill is probably the most
                                                Madam Speaker, S. 1811 enjoys broad                   ing rural flood protection, addressing                 progressive bill in a generation in
                                              bipartisan support because it pays at-                  the maintenance backlog at our Na-                     terms of directing the Army Corps to-
                                              tention to the unique and particular                    tion’s    ports    and   harbors,    and               ward greater resiliency of future water
                                              needs of the different regions of our di-               prioritizing our Nation’s inland water-                resources development projects. It in-
                                              verse Nation. The package includes                      ways.                                                  cludes several provisions to modernize
                                              provisions to protect 90 percent of                       The House passed WRDA by voice                       how the Corps develops future projects
                                              North America’s surface fresh water on                  vote nearly 5 months ago, continuing                   to make sure that it is better able to
                                              our Great Lakes. This includes a spe-                   the strong bipartisan tradition that                   deal with issues of climate change and
                                              cific authorization of the invasive spe-                WRDA enjoys.                                           extreme wet weather events.
                                              cies control system at Brandon Road                       After negotiations with the Senate, I                  All in all, this is a significant invest-
                                              Lock and Dam. The project serves a                      am glad to support this compromise                     ment in water resources infrastructure,
                                              unique national role, and once com-                     bill, which contains nearly all of our                 and I urge my colleagues to support
                                              pleted, will serve as a bulwark for pre-                Chamber’s priorities.                                  this legislation.
                                              venting Asian carp and other invasive                     S. 1811 is fiscally responsible, with                  Mr. GRAVES of Missouri. Madam
                                              species from threatening the fragile                    new project authorizations fully offset                Speaker, I yield 1 minute to the gen-
                                              ecosystem of our Great Lakes and its                    by deauthorizations of projects that                   tleman from Texas (Mr. BABIN).
                                              $7 billion fishery.                                     are outdated or no longer viable.                        Mr. BABIN. Madam Speaker, if
                                                Madam Speaker, today’s authoriza-                       Again, I want to stress that this leg-               southeast Texas is going to continue as
                                              tion marks an important milestone for                   islation represents the continuing com-                the global leader in creating reliable,
                                              protecting the Great Lakes rec-                         mitment to regular order for consider-                 affordable energy, we must modernize
                                              reational fishing industry. Our region                  ation of water resources projects. Reg-                and improve our water infrastructure.
                                              has advocated to include this author-                   ularly overseeing the improvement of                     My district has four ports, including
                                              ization for nearly a decade. And since                  our Nation’s infrastructure is one of                  the main terminal of the Port of Hous-
                                              2010, when Congress authorized the                      the most important responsibilities of                 ton, as well as the Houston Ship Chan-
                                              Great Lakes Interbasin Study, our del-                  Congress.                                              nel, which is the busiest U.S. deep-
                                              egation searched for a long-term and                      This is a good, commonsense, and bi-                 draft waterway and the top exporting
                                              basin-wide solution to the predatory                    partisan bill. I want to recognize the                 port in the Nation.
                                              Asian carp.                                             great work of our subcommittee staff,                    The provisions of 2020’s WRDA to
                                                I commend the committee for embed-                    Ian, John, and Victor. I also want to                  dredge, widen, and improve two-way
                                              ding resiliency into the Corps planning                 thank Chairman DEFAZIO and Chair-                      traffic on the Houston Ship Channel is
                                              processes and for investing to rebuild                  man NAPOLITANO for their partnership                   a product of hard work and collabora-
                                              and advance the Nation’s water infra-                   in its creation.                                       tion over the last several years. This
                                              structure for the 21st century.                           I urge all Members to support S. 1811.               major accomplishment is the corner-
                                                Finally, the bill adds the words                        Mr. DEFAZIO. Madam Speaker, I                        stone for a more efficient, safe, and




SSpencer on DSK126QN23PROD with HOUSE
                                              ‘‘Great Lakes’’ to the name of the                      yield 2 minutes to the gentlewoman                     productive waterway for everyone.
                                              Saint Lawrence Seaway Development                       from     the     Virgin   Islands   (Ms.                 However, I recognize that there is
                                              Corporation, and I look forward to                      PLASKETT).                                             still more work to be done. It is not an
                                              working with my colleagues to shine a                     Ms. PLASKETT. Madam Speaker, I                       exaggeration to say that by spending a
                                              light on the Seaway’s unique role in                    extend my congratulations to the com-                  million dollars today on hurricane and
                                              unleashing the economic potential of                    mittee leaders for successfully reach-                 flood prevention infrastructure, we are
                                              the region and the Nation.                              ing an agreement with the Senate on a                  saving a billion dollars in damages



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00075   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.017   H08DEPT1
                                              H6982                                             CONGRESSIONAL RECORD — HOUSE                                                    December 8, 2020
                                              down the road from another storm like                     Mr. GRAVES of Missouri. Madam                          Mr. ZELDIN. Madam Speaker, I rise
                                              Hurricane Harvey.                                       Speaker, I yield 1 minute to the gen-                  in strong support of this measure,
                                                 Thankfully, this bill contains numer-                tleman from Florida (Mr. MAST).                        which prioritizes six key projects for
                                              ous provisions for me and my col-                         Mr. MAST. Madam Speaker, I thank                     New York’s First Congressional Dis-
                                              leagues on both sides of the aisle that                 Ranking Member GRAVES and Chair-                       trict, a district almost completely sur-
                                              address these critical needs.                           man DEFAZIO for their work and the                     rounded by water.
                                                 I wish to thank Ranking Member                       committee staff for their work on this                   On the east end of Long Island, we
                                              GRAVES as well as Chairman DEFAZIO,                     piece of legislation.                                  have a unique responsibility to safe-
                                              Mr. WESTERMAN, and Mrs. NAPOLITANO.                       Water is the lifeblood of Florida, and               guard our local waterways, from bol-
                                              Passing legislation like this one today                 there is not a more important piece of                 stering our local maritime infrastruc-
                                              will bring great benefit to southeast                   legislation to our State or to our com-                ture to managing future storm risks.
                                              Texas and the entire country.                           munity, my community specifically,                       Working with my colleagues on both
                                                 Mr. DEFAZIO. Madam Speaker, I                        because of the work that this bill does.               sides of the aisle and the Army Corps
                                              yield 1 minute to the gentleman from                      The Water Resources Development
                                                                                                                                                             team at its New York district office,
                                              Texas (Mr. CUELLAR).                                    Act demands that the Army Corps of
                                                                                                                                                             this bill prioritizes local projects that
                                                 Mr. CUELLAR. Madam Speaker, I                        Engineers rewrite protocols that they
                                                                                                                                                             are vital to my congressional district.
                                              want to thank Chairman DEFAZIO for                      have that allow them to poison my
                                                                                                      community, demands that they accel-                      The Fire Island to Montauk Point
                                              his leadership, his staff for working                                                                          project includes essential dredging and
                                              hard on this particular bill, and the                   erate construction of the hugely impor-
                                                                                                      tant EAA Reservoir, demands that                       shoreline projects over 83 miles of
                                              ranking member and his staff for doing                                                                         coastline. Coastal storm risk manage-
                                              this.                                                   they move more water into Florida’s
                                                                                                      Everglades where it is needed because                  ment for Hashamomuck Cove in
                                                 I want to talk about one project that                                                                       Southold is included, where, right now,
                                              got added, and that is the Chacon                       they are dying because of lack of
                                                                                                      water.                                                 local residents, businesses, and first re-
                                              Creek in Laredo, Texas. This is a                                                                              sponders are paralyzed even during a
                                              project that we have been working on                      This piece of legislation is vital to
                                                                                                      our State. I would absolutely argue                    severe thunderstorm.
                                              for many years with the city of Laredo.                                                                          Additionally, this legislation author-
                                              Now, this will provide the flood con-                   there is nothing more important to our
                                                                                                      State, and I couldn’t thank enough the                 izes a feasibility study for a project at
                                              trol, the work that we need to do, that                                                                        Wading River Creek in Riverhead and
                                              starts off from Lake Casa Blanca all                    chairman, the ranking member, and all
                                                                                                      the staff for all of their work on this                expedites     feasibility   studies    for
                                              the way to the Rio Grande, miles of                                                                            projects at Reel Point Preserve and
                                              area that will provide not only for the                 very important piece of legislation.
                                                                                                        Mr. DEFAZIO. Madam Speaker, I re-                    Shelter Island, Goldsmith Inlet in
                                              environment but also for the quality of                                                                        Southold, and Lake Montauk Harbor in
                                                                                                      serve the balance of my time.
                                              life for Laredo.                                          Mr. GRAVES of Missouri. Madam                        Montauk.
                                                 I want to thank Chairman DEFAZIO                                                                              Continuing to safeguard and invest in
                                                                                                      Speaker, I yield 2 minutes to the gen-
                                              so much for his great work, and we ap-                                                                         our maritime infrastructure will help
                                                                                                      tlewoman from Puerto Rico (Miss
                                              preciate him in Laredo, Texas.                                                                                 preserve Long Island’s way of life for
                                                                                                      GONZÁLEZ-COLÓN).
                                                 Mr. GRAVES of Missouri. Madam                          Miss GONZÁLEZ-COLÓN of Puerto                      generations to come.
                                              Speaker, I yield 1 minute to the gen-                   Rico. Madam Speaker, I rise in strong                    Madam Speaker, I urge my col-
                                              tleman from North Carolina (Mr.                         support of WRDA 2020.                                  leagues to support this legislation, and
                                              ROUZER).                                                  This bill increases the authorized                   I thank the chair and ranking member
                                                 Mr. ROUZER. Madam Speaker, I rise                    cost of the Cano Martin Pena Eco-                      for their leadership in making this a
                                              in support of the Water Resources De-                   system     Restoration    Project,    rep-             reality.
                                              velopment Act of 2020.                                  resenting the fully funded cost esti-
                                                 Our Nation’s inlets, waterways, har-                                                                          Mr. DEFAZIO. Madam Speaker, I re-
                                                                                                      mate at fiscal year 2020 levels. This                  serve the balance of my time.
                                              bors, ports, and beaches are critical                   project was authorized in 2007, prior to
                                              components of our national infrastruc-                                                                           Mr. GRAVES of Missouri. Madam
                                                                                                      completing the feasibility phase and                   Speaker, I yield 1 minute to the gen-
                                              ture, supporting countless local econo-                 without updated costs. That is the rea-
                                              mies all across the country.                                                                                   tleman from New York (Mr. JACOBS).
                                                                                                      son it is so important for me. This                      Mr. JACOBS. Madam Speaker, I rise
                                                 My district, which includes the                      change reflects the reality of costs and
                                              southern portion of the North Carolina                                                                         in support of the Water Resources De-
                                                                                                      supports the project moving forward.                   velopment Act, which is critical to dis-
                                              coast, relies on this biennial, bipar-                    This bill also authorizes flood risk
                                              tisan bill to maintain and improve our                                                                         tricts with significant shorelines, like
                                                                                                      management        projects    for     Rio              mine.
                                              resource projects.                                      Culebrinas, Rio Guayanilla, and Rio
                                                 I would like to thank the Army Corps                                                                          I am especially pleased to see the
                                                                                                      Grande de Manati in the municipalities
                                              of Engineers for their work in support                                                                         Great Lakes Coastal Resiliency Study
                                                                                                      of Aguada, Aguadilla, Guayanilla, and
                                              of the coastal storm damage reduction                                                                          included in this bill. High water levels
                                                                                                      Ciales. Authorization is a firm step in
                                              projects at Wrightsville Beach, as well                                                                        on Lake Erie, and especially on Lake
                                                                                                      the right direction as we work with
                                              as Carolina and Kure Beaches. Their                                                                            Ontario, are a major concern to com-
                                                                                                      stakeholders to restore these rivers
                                              team and mine work together con-                                                                               munities in our region. Homeowners
                                                                                                      and improve flood protection and the
                                              stantly to ensure that the right deci-                                                                         and business owners along Lake On-
                                                                                                      health and economic opportunities of
                                              sions are made and executed.                                                                                   tario have suffered significant flooding
                                                                                                      island residents.
                                                 I want to especially thank the chair-                  I would like to thank Chairman                       and devastating property damage over
                                              man and the ranking member for their                    DEFAZIO and Ranking Member GRAVES                      the last few years. This study will in-
                                              work and commitment to keep this leg-                   and their staff for working alongside                  form those projects and policies that
                                              islation a good, bipartisan product of                  my office to secure those provisions.                  will mitigate high water levels and,
                                              the committee. I particularly appre-                      I also want to thank them for includ-                hopefully, prevent future flooding of
                                              ciate their willingness to work with me                 ing the current mapping of all coasts                  the kind suffered recently.
                                              to address the needs of our coastal                     that are experiencing rapid change.                      I would also like to thank our leaders
                                              communities and the infrastructure so                   That means that Alaska, Hawaii, and                    in the House, Ranking Member SAM
                                              important to North Carolina’s econ-                     many of the territories are going to be                GRAVES and Chairman PETER DEFAZIO,
                                              omy. I also want to thank the staff of                  included in that provision.                            for the bipartisan work they have done




SSpencer on DSK126QN23PROD with HOUSE
                                              the majority and minority for the                         Madam Speaker, I urge my col-                        on this legislation. The bipartisan
                                              many hours they have worked to make                     leagues to vote in favor of the bill.                  work in the committee on WRDA is al-
                                              this day possible.                                        Mr. DEFAZIO. Madam Speaker, I re-                    ways welcome and a strong example of
                                                 Madam Speaker, I urge my col-                        serve the balance of my time.                          the way business can be conducted
                                              leagues to support the bill.                              Mr. GRAVES of Missouri. Madam                        here.
                                                 Mr. DEFAZIO. Madam Speaker, I re-                    Speaker, I yield 2 minutes to the gen-                   Madam Speaker, I urge my col-
                                              serve the balance of my time.                           tleman from New York (Mr. ZELDIN).                     leagues to vote in favor of S. 1811.



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00076   Fmt 4634   Sfmt 0634   E:\CR\FM\K08DE7.048   H08DEPT1
                                              December 8, 2020                                  CONGRESSIONAL RECORD — HOUSE                                                                      H6983
                                                                b 1430                                strong principles and priorities from                  neers (Corps) for their funding of the Dallas
                                                 Mr. GRAVES of Missouri. Madam                        the House bill.                                        Flood way, Dallas Flood way Extension flood
                                              Speaker, I yield 3 minutes to the gen-                     Madam Speaker, I would just like to                 risk management projects and Lewisville Dam
                                              tleman from Illinois (Mr. RODNEY                        say, as well, that it has been a pleasure              repairs and their continued efforts to complete
                                              DAVIS).                                                 working with Chairman DEFAZIO and                      these projects quickly. I look forward to con-
                                                 Mr. RODNEY DAVIS of Illinois.                        his staff in this process, and this is the             tinuing to hear good reports on the progress of
                                              Madam Speaker, I thank my good                          way that the Committee on Transpor-                    these projects. I am pleased that the Corp is
                                              friend, the ranking member. I didn’t re-                tation and Infrastructure usually                      moving forward with these projects.
                                              alize I was delaying his closing state-                 works; and when it does work this way,                    Please allow me to note that it is helpful for
                                              ment. I am interested in hearing it,                    we produce really good products.                       the Corps to accept input from non-federal
                                                                                                         This is a good piece of legislation,                sponsors in the development of WRDA guid-
                                              too.
                                                 And then we are going to compare                     and, hopefully, we will see much more                  ance. The Corps, working with local non-fed-
                                              beards together after this; right? I am                 of that in the future. I know I am com-                eral sponsors instead of developing guidance
                                              going to lose, I know, because he is the                mitted to it, and I think it makes a big               independently, will result in more resilient
                                              ranking member. That is what hap-                       difference.                                            projects with multiple benefits. The role of re-
                                                                                                         Madam Speaker, I urge all Members                   siliency in the construction, operation and
                                              pens.
                                                                                                      to join me in supporting this bipartisan               maintenance of projects carried out by the
                                                 Madam Speaker, I do want to say a
                                                                                                      legislation, and I yield back the bal-                 U.S. Army Corps of Engineers (Corps) must
                                              heartfelt thank-you and congratula-
                                                                                                      ance of my time.                                       continue to be a priority.
                                              tions to Ranking Member GRAVES. This                       Mr. DEFAZIO. Madam Speaker, I
                                              is a testament to his leadership for our                                                                          The Dallas area falls within the South-
                                                                                                      yield myself such time as I may con-                   western Division of the Army Corps of Engi-
                                              side on this committee that we have                     sume.
                                              come here to see such bipartisanship                                                                           neers. Flooding and flood control continue to
                                                                                                         Madam Speaker, as has been said and
                                              when it comes to the Water Resources                                                                           be issues that are ever-present on the minds
                                                                                                      doesn’t need to be repeated, this is a
                                              Development Act.                                                                                               of residents along the Trinity River. I have
                                                                                                      fully bipartisan bill, and it does make
                                                 Madam Speaker, I do also want to                                                                            held several meetings on flooding in the Dal-
                                                                                                      essential investments in water infra-
                                              thank Chairman DEFAZIO for his hard                     structure that will impact virtually                   las area to address this issue and hope to
                                              work. This is something that we have                    every State and territory of the United                continue to work with the Corp to combat
                                              seen over my time in Congress. My                       States of America.                                     flooding in Dallas.
                                              first term, I was blessed enough to be                     As a great maritime nation, we can’t                   Other parts of North Texas have also bene-
                                              appointed to the conference committee                   afford not to make these investments;                  fited from projects included in previous
                                              that got us on track for getting WRDA                   and hopefully it will be added, without                versions of WRDA legislation. The projects ad-
                                              together on a biennial process.                         change, to the omnibus year-end deal,                  dressing pump stations and levy heights in
                                                 Chairman DEFAZIO and Ranking                         or the Senate could perhaps take it up                 Dallas, along with bridge projects in Ft. Worth
                                              Member GRAVES, these are the guys                       under unanimous consent since I don’t                  would not be where they are today without the
                                              who helped lead the teams to put this                   think anyone would object to it over                   Corps and this legislation.
                                              successful effort together.                             there. One way or another, hopefully,                     Madam Speaker, the Dallas-Fort Worth
                                                 And the chairman, I am sure, is prob-                it will get done.                                      Metroplex is growing at a quite rapid pace and
                                              ably surprised. I haven’t been one to                      Madam Speaker, I would like to be                   this updated legislation will help to provide
                                              stand up and talk about bipartisanship                  more specific in thanking staff for this               adequate water and wastewater infrastructure
                                              in this Congress as much as I would                     legislation. There was quite a lengthy                 to meet the demands, given the rapid pace of
                                              have liked, but today is that day to                    negotiation.                                           growth and development in our area. Further-
                                              celebrate, and he needs to be com-                         The Senate never individually passed                more, the bill will help in addressing mainte-
                                              mended for his leadership, and I am ex-                 the bill. We had to negotiate the whole                nance needs, replacing aging infrastructure,
                                              cited that we see this success when it                  bill with the Senate, and Ryan Seiger                  and help in accounting for human behavior in
                                              comes to WRDA.                                          led the team—he did a great job—                       all aspects of our water system—from sewer
                                                 This legislation is important to my                  Camille Touton, Navis Bermudez, and                    overflows, to promoting water conservation
                                              district because I represent the Illinois               Alexa Williams; and on the Republican                  through drought tolerant outdoor landscaping.
                                              and Mississippi waterways, the naviga-                  side, Ian Bennitt, Jon Pawlow, and Vic-                   Lastly, I want to thank the committee for
                                              tion projects that make sure that glob-                 tor Sarmiento.                                         working with me to include language in the bill
                                              al commerce gets from my district out                      Then the unseen heroes behind all                   regarding the embankment of Lake Waco, on
                                              into the global marketplace.                            the good work here in the House are                    which Lake Shore Drive is located, so that we
                                                 Without proper policies governing                    those who work in the Office of Legis-                 may keep the public safe from danger. We
                                              the Corps of Engineers and projects                     lative Counsel, and too often we over-                 were able to work with the Senate on lan-
                                              that are so important to my district,                   look how critical they are to writing                  guage that was direct and clear. It is very en-
                                              we wouldn’t be able to be as successful,                good legislation.                                      couraging to know that we can continue to
                                              economically. This is the reason why I                     Sometimes I am amazed at the                        work in a bipartisan way to work with the com-
                                              am so excited that we see this bipar-                   things that are introduced and that are                mittee to ensure that Lakeshore Drive is not a
                                              tisan effort.                                           gibberish, to put it mildly. Kakuti Lin                safety hazard.
                                                 Madam Speaker, I urge a hearty                       and all her colleagues, thank you very                    Madam Speaker, the projects I just men-
                                              ‘‘yes’’ vote and passage on this bill, and              much for your tremendous work on                       tioned are a tiny piece of the multitude of
                                              I thank every one of my colleagues who                  this, and it will be a great benefit to                projects the Army Corps of Engineers works
                                              helped get us to this point. Madam                      the Nation.                                            on to help address the water needs of the
                                              Speaker, I certainly look forward to an                    Madam Speaker, I yield back the bal-                United States and its residents. Every Amer-
                                              overwhelming vote in the House today                    ance of my time.                                       ican is impacted by this legislation and I urge
                                              or later this week.                                        Ms. JOHNSON of Texas. Madam Speaker,                my colleagues to support it.
                                                 Mr. GRAVES of Missouri. Madam                        I rise in strong support of S 1811, the Water             Mrs. NAPOLITANO. Madam Speaker, I rise
                                              Speaker, I yield myself such time as I                  Resources Development Act. I would like to             in strong support of S. 1811, the Water Re-
                                              may consume.                                            thank Chairman DEFAZIO and my fellow col-              sources Development Act of 2020. Today’s
                                                 Madam Speaker, in closing, let me                    leagues on the House Transportation and In-            vote is on the bipartisan, bicameral WRDA
                                              note that WRDA 2020 will make Amer-                     frastructure Committee, along with my col-             agreement by House and Senate Committee
                                              ica more competitive, grow jobs, foster                 leagues in the Senate, for their diligent work to      leaders. I want to particularly thank Chairman




SSpencer on DSK126QN23PROD with HOUSE
                                              a more robust economy, and, very im-                    produce this much needed water resources               DEFAZIO, Ranking Member GRAVES, Sub-
                                              portantly, it is going to protect our                   bill. Everyone is the U.S. is impacted by the          committee Ranking Member WESTERMAN and
                                              communities for years to come.                          need for clean water and I believe this bill           the Members of the Transportation and Infra-
                                                 We passed a very similar bill by voice               takes a giant step forward to ensuring this be-        structure Committee for their important work
                                              vote earlier this year, and this version                comes a reality for every American.                    over the past 2 years on this bill.
                                              reflects negotiations with the Senate                      Within my district, The City of Dallas is ap-          The Water Resources Development Act is
                                              that successfully maintained those                      preciative to the U.S. Army Corps of Engi-             our legislative commitment to investing in



                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00077   Fmt 4634   Sfmt 9920   E:\CR\FM\K08DE7.051   H08DEPT1
                                              H6984                                             CONGRESSIONAL RECORD — HOUSE                                                       December 8, 2020
                                              Corps projects that help to protect our commu-          committee Vice Chair DEBBIE MUCARSEL-POW-              the San Francisco Bay to Stockton Navigation
                                              nities from flooding events, restore our envi-          ELL, for her leadership on WRDA and espe-              Improvement Project, Lower Cache Creek
                                              ronment and ecosystems, and keep our na-                cially all things Florida.                             Flood Risk Management Project, and Sutter
                                              tion’s competitiveness by investing in our ports           Thank you to the leadership at the U.S.             Bypass and Sacramento River Basin Flood-
                                              and harbors.                                            Army Corps of Engineers, ASA James, Gen-               plain Management Project. I look forward to
                                                 The projects considered in this legislation          eral Spellmon, Retired General Semonite, Al            securing Congressional authorization for these
                                              are truly from Sea to Shining Sea—from the              Lee and the Senior Executive Service team,             projects once the Army Corps completes the
                                              Unalaska (Dutch Harbor) Project in Alaska, to           and Corps Counsel. I would especially like to          requisite feasibility studies.
                                              the Yuba River Ecosystem Restoration in Cali-           thank        Corps      Futures       Team—David          Working with Rep. DORIS O. MATSUI (CA–
                                              fornia, the Matagorda Ship Channel project in           Wethington, Laura Powell, and Andrea Busch,            06), I secured inclusion of our ‘‘Yolo Bypass
                                              Texas, to the New York and New Jersey An-               for their time and partnership in answering our        System Improvement Act’’ in WRDA 2020 to
                                              chorages.                                               questions to the nearly 1,100 submissions we           improve coordinated planning for all restora-
                                                 Through biennial enactment of WRDA legis-            received for WRDA 2020.                                tion projects and federal permitting in the Yolo
                                              lation, the Congress has addressed local, re-              I am very fortunate to have some of the             Bypass.
                                              gional, and national needs through authoriza-           best water and port leaders in the country in             Lastly, I am very pleased that the new Army
                                              tion of new Corps projects, studies, and poli-          my district and Southern California who pro-           Corps harmful algal bloom program estab-
                                              cies that benefit every corner of the nation.           vided valuable input for this bill, including Col.     lished under WRDA 2020 includes the Cali-
                                              WRDA 2020 is no exception.                              Julie Balten, Col. Aaron Barta and David Van           fornia Delta as a focus area. This will better
                                                 I would particularly like to recognize Chair-        Dorpe of the Los Angeles District, Los Ange-           protect the Delta’s precious ecosystem from
                                              man DEFAZIO for his continued efforts to                les County Supervisor Hilda Solis, Los Ange-           toxic algal blooms.
                                              unlock the Harbor Maintenance Trust Fund                les County Public Works Director Mark                     The House report for WRDA 2020 includes
                                              and his partnership in ensuring that all ports          Pestrella, Los Angeles City Mayor Eric                 my amendment directing the Army Corps to
                                              receive the tools they need in the future.              Garcetti, Los Angeles Port Director Gene               report to Congress on implementation of the
                                                 My region is home to the largest ports in the        Seroka, Long Beach Port Director Mario                 Small Business Act across all the Corps’ mis-
                                              nation, the Port of Los Angeles and the Port            Cordero, Metropolitan Water District Board             sions. This strengthens Congressional over-
                                              of Long Beach. These ports handle over 40               Chair Gloria Grey, and San Gabriel Basin               sight over the Corps’ contracting process and
                                              percent of the exports and imports into the             Watermaster Tony Zampiello.                            ensures that the Small Business Act is imple-
                                              United States. Los Angeles and Long Beach                  Madam Speaker, I would particularly like to         mented fully in an equitably distributed man-
                                              have invested billions of dollars of their own          thank the Subcommittee Ranking Member                  ner, as intended by Congress.
                                              money to upgrade their infrastructure for the           BRUCE WESTERMAN for his friendship and                    I want to extend a special appreciation to
                                              benefit of the entire nation. But the success of        collegiality through the hearings, meetings and        my colleague Rep. GRACE F. NAPOLITANO
                                              the Ports of Los Angeles and Long Beach are             roundtables which led to this bipartisan ac-           (CA–32), chairwoman of the Subcommittee on
                                              only as strong as their partnership with the            complishment. And most importantly, I would            Water Resources and Environment, for her
                                              federal government.                                     like to thank the incredible water sub-                tireless work in this WRDA for the entire Cali-
                                                 As part of this legislation, donor ports like        committee staff, including Alexa Williams,             fornia delegation. WRDA 2020 ensures that
                                              the Ports of Los Angeles and Long Beach will            Camille Touton, Navis Bermudez, Ryan                   Army Corps projects in California requiring
                                              benefit from a greater share of the Harbor              Seiger, Victor Sarmiento, Jon Pawlow, and Ian          earthquake-resistance and other seismic safe-
                                              Maintenance Trust Fund. Expanded in-water               Bennitt.                                               ty costs remain equally competitive for federal
                                              uses that are crucial to the navigation of the             I urge my colleagues to support WRDA                funding compared to projects in other states.
                                              federal channel are now eligible. Seismic im-           2020.                                                     I urge all Members of Congress to support
                                              pacts will also be considered as part of the               Mr. GARAMENDI. Madam Speaker, I rise in             this bipartisan WRDA 2020, which is expected
                                              benefit-cost ratio for navigation projects.             strong support of the final ‘‘Water Resources          to be signed into law this year. This two-year
                                                 I am also proud of the provisions in WRDA            Development Act of 2020’’ (S. 1811). Working           authorization bill provides the federal support
                                              that look to study water supply as a primary            with other members of the Committee on                 and certainty needed to keep Army Corps
                                              purpose of the Corps. We in the West are in             Transportation and Infrastructure, I am very           projects across California on time and on
                                              a continuous fight against drought, and we              pleased to reach agreement with the Senate             budget.
                                              have remarkable Corps reservoirs that were              on a truly bipartisan bill and the fourth biennial        The SPEAKER pro tempore. The
                                              built for flood control but can be used more ef-        Water Resources Development Act (WRDA) to              question is on the motion offered by
                                              fectively for local water supply. The Corps is          be passed by Congress since 2014.                      the gentleman from Oregon (Mr. DEFA-
                                              adapting to these local needs in the West, and             My Congressional district includes 200 miles        ZIO) that the House suspend the rules
                                              this bill will give the Corps more ability and          of the Sacramento River and is adjacent to             and pass the bill, S. 1811, as amended.
                                              focus on addressing long-term water reliability         several major ports. WRDA 2020 includes key               The question was taken; and (two-
                                              of arid communities.                                    provisions for the California Delta and Central        thirds being in the affirmative) the
                                                 The bill also includes important assistance          Valley to authorize and expedite construction          rules were suspended and the bill, as
                                              to socio-economically disadvantaged urban               of flood protection and aquatic ecosystem res-         amended, was passed.
                                              and rural areas by requiring the Corps to work                                                                    The title of the bill was amended so
                                                                                                      toration projects, address harmful algal
                                              more directly with local leaders and residents                                                                 as to read: ‘‘A bill to provide for im-
                                                                                                      blooms, and give local agencies greater flexi-
                                              on Corps projects and provide positive im-                                                                     provements to the rivers and harbors of
                                                                                                      bility in using federal Army Corps funds to bet-
                                              pacts to these communities. This will build                                                                    the United States, to provide for the
                                                                                                      ter meet local needs. Under Chairman DEFA-
                                              long-term resiliency for economic develop-                                                                     conservation and development of water
                                                                                                      ZIO’s leadership, the bill finally fixes the Harbor
                                              ment, environmental and health improve-                                                                        and related resources, and for other
                                                                                                      Maintenance Trust Fund to ensure that re-
                                              ments, and clean and safe water resource                                                                       purposes.’’.
                                                                                                      gional dredging and navigation projects are               A motion to reconsider was laid on
                                              projects.                                               fully funded.                                          the table.
                                                 Lastly, this bill includes language necessary           I secured Congressional authorization for
                                              for my district and wildfire prone regions of the       the Delta Islands and Levees Ecosystem Res-                              f
                                              country to improve efforts by the Corps to re-          toration Project, Yuba River Ecosystem Res-                    ROUTE 66 CENTENNIAL
                                              move unauthorized, human-made flammable                 toration Project, and Sacramento Regional                         COMMISSION ACT
                                              equipment and materials from Corps property.            Groundwater Bank in WRDA 2020. These                     Mr. DEFAZIO. Madam Speaker, I
                                              This year there was an illegal fire on Corps            projects provide critical flood protection and         move to suspend the rules and pass the
                                              property in my district that led to a major wild-       make local communities across the Central              bill (S. 1014) to establish the Route 66
                                              fire evacuating hundreds of residents and               Valley more resilient to climate change.




SSpencer on DSK126QN23PROD with HOUSE
                                                                                                                                                             Centennial Commission, and for other
                                              coming close to damaging property and harm-                I also secured deauthorization of the Sac-          purposes.
                                              ing our community. The language in this bill,           ramento Riverbed Gradient Restoration Facil-             The Clerk read the title of the bill.
                                              in addition to efforts to increase Corps fund-          ity and Western Pacific Interceptor Canal, re-           The text of the bill is as follows:
                                              ing, will go a long way to helping the Corps re-        turning these former Army Corps projects to                                 S. 1014
                                              move these fire hazards.                                full local control.                                      Be it enacted by the Senate and House of Rep-
                                                 I would like to thank the many people who               WRDA 2020 also expedites completion of              resentatives of the United States of America in
                                              have helped this bill become a reality: Sub-            the Army Corps’ feasibility studies needed for         Congress assembled,




                                        VerDate Sep 11 2014   09:05 Dec 09, 2020   Jkt 019060   PO 00000   Frm 00078   Fmt 4634   Sfmt 0634   E:\CR\FM\A08DE7.022   H08DEPT1


File and source

File
CREC_crec-2020-12-08_crec-2020-12-08-pt1-pgh6935-3.pdf
Size
568,597 bytes
SHA-256
a45a4128deec9481a97ccea67c37b7ca9bc83aca1f598015a7ece352668d8f32
Our copy
CREC_crec-2020-12-08_crec-2020-12-08-pt1-pgh6935-3.pdf
Original
www.govinfo.gov
Back to top