Pandemic Darlings The pandemic economy, in original documents
Home Source documents Congressional Record, House, July 29, 2020 — H.R. 7575 Water Resources Development Act of 2020

Congressional Record, House, July 29, 2020 — H.R. 7575 Water Resources Development Act of 2020

Summary

Page H3927 of the House section of the Congressional Record for July 29, 2020, from a very long page on H.R. 7575, a water resources bill. A bill on ride-hailing companies, with an enhanced digital system to verify passengers and drivers, passes under suspended rules with an amended title. The water resources bill's table of contents lists sections including a GAO study on environmental banks, a study on water supply and conservation, and a PFAS review and inventory at Corps facilities. A speaker from the Dallas-Fort Worth area says the region depends on the Corps, and a roll call list follows.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Congressional Record, House, July 29, 2020 — H.R. 7575 Water Resources Development Act of 2020.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/crec-crec-2020-07-29-crec-2020-07-29-pt1-pgh3927-2-34f667a8bc/, SHA-256 95923fcf20cefc4f71d7fca2e80c3e1891259e41e1aeb0dd92da2b64d45abe55.

Full text

                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                    H3927
                                            rules were suspended and the bill, as                    Sec. 118. Federal interest determination.              Sec. 219. GAO study on administration of en-
                                            amended, was passed.                                     Sec. 119. Economically disadvantaged com-                            vironmental banks.
                                              The title of the bill was amended so                                munity flood protection and               Sec. 220. Study on Corps of Engineers con-
                                                                                                                  hurricane and storm damage re-                          cessionaire agreements.
                                            as to read: ‘‘A bill to require ride-hail-                                                                      Sec. 221. Study on water supply and water
                                                                                                                  duction study pilot program.
                                            ing companies to implement an en-                        Sec. 120. Permanent measures to reduce                               conservation at water resources
                                            hanced digital system to verify pas-                                  emergency flood fighting needs                          development projects.
                                            sengers with their authorized ride-hail-                              for communities subject to re-            Sec. 222. PFAS review and inventory at
                                            ing vehicles and drivers.’’.                                          petitive flooding.                                      Corps facilities.
                                              A motion to reconsider was laid on                     Sec. 121. Emergency response to natural dis-           Sec. 223. Report on recreational facilities.
                                            the table.                                                            asters.                                     TITLE III—DEAUTHORIZATIONS AND
                                                                                                     Sec. 122. Study on natural infrastructure at                          MODIFICATIONS
                                                             f                                                    Corps of Engineers projects.
                                                                                                     Sec. 123. Review of Corps of Engineers as-             Sec. 301. Deauthorization       of    inactive
                                            PERMISSION TO EXTEND DEBATE                                                                                                   projects.
                                              TIME ON H.R. 7575, WATER RE-                                        sets.
                                                                                                     Sec. 124. Sense of Congress on multipurpose            Sec. 302. Abandoned and inactive noncoal
                                              SOURCES DEVELOPMENT ACT OF                                          projects.                                               mine restoration.
                                              2020                                                   Sec. 125. Beneficial reuse of dredged mate-            Sec. 303. Tribal partnership program.
                                                                                                                  rial; dredged material manage-            Sec. 304. Lakes program.
                                              Mr. DEFAZIO. Mr. Speaker, I ask                                                                               Sec. 305. Watercraft inspection stations.
                                            unanimous consent that debate under                                   ment plans.
                                                                                                     Sec. 126. Aquatic ecosystem restoration for            Sec. 306. Rehabilitation of Corps of Engi-
                                            clause 1(c) of rule XV on a motion to                                                                                         neers constructed dams.
                                                                                                                  anadromous fish.
                                            suspend the rules relating to H.R. 7575                  Sec. 127. Annual report to Congress.                   Sec. 307. Chesapeake Bay Environmental
                                            be extended to 1 hour at the request of                  Sec. 128. Harmful algal bloom demonstra-                             Restoration     and  Protection
                                            the minority.                                                         tion program.                                           Program.
                                              The SPEAKER pro tempore. Is there                      Sec. 129. Update on Invasive Species Policy            Sec. 308. Upper Mississippi River System En-
                                                                                                                  Guidance.                                               vironmental Management Pro-
                                            objection to the request of the gen-
                                                                                                     Sec. 130. Report on debris removal.                                  gram.
                                            tleman from Oregon?                                                                                             Sec. 309. McClellan-Kerr Arkansas River
                                                                                                     Sec. 131. Missouri River interception-rearing
                                              There was no objection.                                                                                                     Navigation System.
                                                                                                                  complex construction.
                                                             f                                       Sec. 132. Cost and benefit feasibility assess-         Sec. 310. Ouachita-Black River Navigation
                                                                                                                  ment.                                                   Project, Arkansas.
                                                     WATER RESOURCES                                                                                        Sec. 311. Sacramento River, Glenn-Colusa,
                                                                                                     Sec. 133. Materials, services, and funds for
                                                DEVELOPMENT ACT OF 2020                                           repair, restoration, or rehabili-                       California.
                                              Mr. DEFAZIO. Mr. Speaker, I move                                    tation of projects.                       Sec. 312. Lake Isabella, California.
                                            to suspend the rules and pass the bill                   Sec. 134. Levee safety.                                Sec. 313. Lower San Joaquin River flood con-
                                                                                                     Sec. 135. National Dam Safety Program.                               trol project.
                                            (H.R. 7575) to provide for improvements
                                                                                                     Sec. 136. Rehabilitation of Corps of Engi-             Sec. 314. San Diego River and Mission Bay,
                                            to the rivers and harbors of the United                               neers constructed pump sta-                             San Diego County, California.
                                            States, to provide for the conservation                               tions.                                    Sec. 315. San Francisco, California, Water-
                                            and development of water and related                     Sec. 137. Non-Federal Project Implementa-                            front Area.
                                            resources, and for other purposes, as                                 tion Pilot Program.                       Sec. 316. Western Pacific Interceptor Canal,
                                            amended.                                                 Sec. 138. Definition of economically dis-                            Sacramento River, California.
                                              The Clerk read the title of the bill.                               advantaged community.                     Sec. 317. Rio Grande Environmental Man-
                                              The text of the bill is as follows:                    Sec. 139. Cost sharing provisions for terri-                         agement Program, Colorado,
                                                                                                                  tories and Indian Tribes.                               New Mexico, and Texas.
                                                                H.R. 7575
                                                                                                     Sec. 140. Flood control and other purposes.            Sec. 318. New London Harbor Waterfront
                                              Be it enacted by the Senate and House of Rep-          Sec. 141. Review of contracting policies.                            Channel, Connecticut.
                                            resentatives of the United States of America in          Sec. 142. Buy America.                                 Sec. 319. Washington Harbor, District of Co-
                                            Congress assembled,                                      Sec. 143. Annual report on status of feasi-                          lumbia.
                                            SECTION 1. SHORT TITLE; TABLE OF CONTENTS.                            bility studies.                           Sec. 320. Big Cypress Seminole Indian Res-
                                              (a) SHORT TITLE.—This Act may be cited as                  TITLE II—STUDIES AND REPORTS                                     ervation Water Conservation
                                            the ‘‘Water Resources Development Act of                 Sec. 201. Authorization of proposed feasi-                           Plan, Florida.
                                            2020’’.                                                               bility studies.                           Sec. 321. Central Everglades, Florida.
                                              (b) TABLE OF CONTENTS.—The table of con-               Sec. 202. Expedited completions.                       Sec. 322. Miami River, Florida.
                                            tents for this Act is as follows:                        Sec. 203. Feasibility study modifications.             Sec. 323. Julian Keen, Jr. Lock and Dam,
                                            Sec. 1. Short title; table of contents.                  Sec. 204. Selma, Alabama.                                            Moore Haven, Florida.
                                            Sec. 2. Secretary defined.                               Sec. 205. Comprehensive study of the Sac-              Sec. 324. Taylor Creek Reservoir and Levee
                                                  TITLE I—GENERAL PROVISIONS                                      ramento River, Yolo Bypass,                             L–73 (Section 1), Upper St.
                                            Sec. 101. Budgetary treatment expansion                               California.                                             Johns River Basin, Florida.
                                                                                                     Sec. 206. Lake Okeechobee regulation sched-            Sec. 325. Calcasieu River and Pass, Lou-
                                                          and adjustment for the Harbor
                                                                                                                  ule, Florida.                                           isiana.
                                                          Maintenance Trust Fund.
                                            Sec. 102. Funding for navigation.                        Sec. 207. Great Lakes Coastal Resiliency               Sec. 326. San Juan-Chama project; Abiquiu
                                            Sec. 103. Annual report to Congress on the                            Study.                                                  Dam, New Mexico.
                                                          Harbor      Maintenance    Trust           Sec. 208. Rathbun Lake, Chariton River,                Sec. 327. Pawcatuck River, Little Narragan-
                                                          Fund.                                                   Iowa.                                                   sett Bay and Watch Hill Cove,
                                            Sec. 104. Additional measures at donor ports             Sec. 209. Report on the status of restoration                        Rhode Island and Connecticut.
                                                          and energy transfer ports.                              in the Louisiana coastal area.            Sec. 328. Harris County, Texas.
                                            Sec. 105. Assumption of maintenance of a lo-             Sec. 210. Lower Mississippi River com-                 Sec. 329. Cap Sante Waterway, Washington.
                                                          cally preferred plan.                                   prehensive study.                         Sec. 330. Regional sediment management.
                                            Sec. 106. Coast Guard anchorages.                        Sec. 211. Upper Mississippi River Com-                 Sec. 331. Additional assistance for critical
                                            Sec. 107. State contribution of funds for cer-                        prehensive Plan.                                        projects.
                                                          tain operation and maintenance             Sec. 212. Lower Missouri Basin Flood Risk              Sec. 332. Project modification authoriza-
                                                          costs.                                                  and Resiliency Study, Iowa,                             tions.
                                            Sec. 108. Inland waterway projects.                                   Kansas, Nebraska, and Mis-                Sec. 333. Application of credit.
                                            Sec. 109. Implementation of water resources                           souri.                                    Sec. 334. Project reauthorizations.
                                                          principles and requirements.               Sec. 213. Portsmouth Harbor and Piscataqua             Sec. 335. Conveyances.
                                            Sec. 110. Resiliency planning assistance.                             River and Rye Harbor, New                 Sec. 336. Repeals.
                                            Sec. 111. Project consultation.                                       Hampshire.                                      TITLE IV—WATER RESOURCES
                                            Sec. 112. Review of resiliency assessments.              Sec. 214. Cougar and Detroit Dams, Willam-                          INFRASTRUCTURE
                                            Sec. 113. Small flood control projects.                               ette River Basin, Oregon.                 Sec. 401. Project authorizations.
                                            Sec. 114. Conforming amendment.                          Sec. 215. Port Orford, Oregon.                         Sec. 402. Special rules.




dlhill on DSK120RN23PROD with HOUSE
                                            Sec. 115. Feasibility studies; review of nat-            Sec. 216. Wilson Creek and Sloan Creek,
                                                                                                                                                            Sec. 403. Authorization of projects based on
                                                          ural and nature-based features.                         Fairview, Texas.
                                                                                                                                                                          feasibility studies prepared by
                                            Sec. 116. Report on corrosion prevention ac-             Sec. 217. GAO study on mitigation for water
                                                                                                                                                                          non-Federal interests.
                                                          tivities.                                               resources development projects.
                                            Sec. 117. Quantification of benefits for flood           Sec. 218. GAO study on application of Har-                  TITLE V—BUDGETARY EFFECTS
                                                          risk management projects in                             bor Maintenance Trust Fund                Sec. 501. Determination of Budgetary Ef-
                                                          seismic zones.                                          expenditures.                                           fects.




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00045   Fmt 4634   Sfmt 0634   E:\CR\FM\K29JY7.066   H29JYPT1
                                            H3928                                              CONGRESSIONAL RECORD — HOUSE                                                             July 29, 2020
                                            SEC. 2. SECRETARY DEFINED.                               subparagraph (A) at an emerging harbor                   ‘‘(D) An activity to maintain slope sta-
                                              In this Act, the term ‘‘Secretary’’ means              that—                                                  bility at a berth in a harbor that is acces-
                                            the Secretary of the Army.                                 ‘‘(i) supports commercial activities, includ-        sible to a Federal navigation project if such
                                                  TITLE I—GENERAL PROVISIONS                         ing commercial fishing operations, commer-             activity benefits commercial navigation at
                                            SEC. 101. BUDGETARY TREATMENT EXPANSION                  cial fish processing operations, recreational          the harbor.’’.
                                                       AND ADJUSTMENT FOR THE HAR-                   and sport fishing, and commercial boat                 SEC. 103. ANNUAL REPORT TO CONGRESS ON THE
                                                       BOR MAINTENANCE TRUST FUND.                   yards; or                                                          HARBOR    MAINTENANCE    TRUST
                                              (a) IN GENERAL.—Section 14003 of division                ‘‘(ii) supports activities of the Secretary of                   FUND.
                                            B of the CARES Act (Public Law 116–136) is               the department in which the Coast Guard is               Section 330 of the Water Resources Devel-
                                            amended to read as follows:                              operating.                                             opment Act of 1992 (26 U.S.C. 9505 note; 106
                                              ‘‘SEC. 14003. Section 251(b)(2) of the Bal-              ‘‘(C) COST-SHARING REQUIREMENTS.—The                 Stat. 4851) is amended—
                                            anced Budget and Emergency Deficit Control               Secretary shall require a non-Federal inter-             (1) in subsection (a)—
                                            Act of 1985 (2 U.S.C. 901(b)(2)) is amended by           est to contribute not less than 25 percent of            (A) by striking ‘‘and annually thereafter,’’
                                            adding at the end the following:                         the costs for maintenance dredging of that             and inserting ‘‘and annually thereafter con-
                                              ‘‘ ‘(H) HARBOR MAINTENANCE ACTIVITIES.—If,             portion of a maintenance dredging project              current with the submission of the Presi-
                                            for any fiscal year, appropriations for the              described in subparagraph (A) that is located          dent’s annual budget request to Congress,’’;
                                            Construction, Mississippi River and Tribu-               outside of the Federal navigation project,             and
                                            taries, and Operation and Maintenance ac-                which may be provided as an in-kind con-                 (B) by striking ‘‘Public Works and Trans-
                                            counts of the Corps of Engineers are enacted             tribution, including through the use of                portation’’ and inserting ‘‘Transportation
                                            that are derived from the Harbor Mainte-                 dredge equipment owned by non-Federal in-              and Infrastructure’’; and
                                            nance Trust Fund established under section               terest to carry out such activities.’’; and              (2) in subsection (b)(1) by adding at the end
                                            9505(a) of the Internal Revenue Code of 1986               (3) by adding at the end the following:              the following:
                                            and that the Congress designates in statute                ‘‘(5) EMERGENCY EXPENDITURES.—Nothing                  ‘‘(D) A description of the expected expendi-
                                            as being for harbor operations and mainte-               in this subsection prohibits the Secretary             tures from the trust fund to meet the needs
                                            nance activities, then the adjustment for                from making an expenditure to pay for the              of navigation for the fiscal year of the budg-
                                            that fiscal year shall be the total of such ap-          operation and maintenance costs of a spe-              et request.’’.
                                            propriations that are derived from such Fund             cific harbor or inland harbor, including the           SEC. 104. ADDITIONAL MEASURES AT DONOR
                                            and designated as being for harbor oper-                                                                                   PORTS AND ENERGY TRANSFER
                                                                                                     transfer of funding from the operation and
                                            ations and maintenance activities.’.’’.                                                                                    PORTS.
                                                                                                     maintenance of a separate project, if—
                                              (b) EFFECTIVE DATE.—The amendment                                                                               (a) DEFINITIONS.—Section 2106(a) of the
                                                                                                       ‘‘(A) the Secretary determines that the ac-
                                            made by subsection (a) shall take effect as if                                                                  Water Resources Reform and Development
                                                                                                     tion is necessary to address the navigation            Act of 2014 (33 U.S.C. 2238c(a)) is amended—
                                            included in the enactment of the CARES Act
                                                                                                     needs of a harbor or inland harbor where safe             (1) in paragraph (3)(A)—
                                            (Public Law 116–136).
                                                                                                     navigation has been severely restricted due               (A) by amending clause (ii) to read as fol-
                                            SEC. 102. FUNDING FOR NAVIGATION.
                                                                                                     to an unforeseen event; and                            lows:
                                              (a) FUNDING FOR NAVIGATION.—Section 210
                                                                                                       ‘‘(B) the Secretary provides within 90 days             ‘‘(ii) at which the total amount of harbor
                                            of the Water Resources Development Act of
                                                                                                     of the action notice and information on the            maintenance taxes collected (including the
                                            1986 (33 U.S.C. 2238) is amended, in the sec-
                                                                                                     need for the action to the Committee on En-            estimated taxes related to domestic cargo
                                            tion heading, by striking ‘‘AUTHORIZATION OF
                                                                                                     vironment and Public Works and the Com-                and cruise passengers) comprise not less
                                            APPROPRIATIONS’’ and inserting ‘‘FUNDING FOR
                                            NAVIGATION’’.
                                                                                                     mittee on Appropriations of the Senate and             than $15,000,000 annually of the total funding
                                              (b) OPERATION AND MAINTENANCE OF HAR-                  the Committee on Transportation and Infra-             of the Harbor Maintenance Trust Fund in
                                            BOR PROJECTS.—Section 210(c) of the Water                structure and the Committee on Appropria-              each of the previous 3 fiscal years;’’;
                                            Resources Development Act of 1986 (33 U.S.C.             tions of the House of Representatives.’’.                 (B) in clause (iii), by inserting ‘‘(including
                                            2238(c)) is amended—                                       (c) PRIORITIZATION.—Section 210 of the               the estimated taxes related to domestic
                                              (1) by amending paragraph (1) to read as               Water Resources Development Act of 1986 (33            cargo and cruise passengers)’’ after ‘‘taxes
                                            follows:                                                 U.S.C. 2238) is amended by striking sub-               collected’’; and
                                              ‘‘(1) IN GENERAL.—For each fiscal year, of             section (d) and redesignating subsections (e)             (C) in clause (iv), by striking ‘‘fiscal year
                                            the funds made available under this section              and (f) as subsections (d) and (e), respec-            2012’’ and inserting ‘‘each of the previous 3
                                            (including funds appropriated from the Har-              tively.                                                fiscal years’’;
                                            bor Maintenance Trust Fund), the Secretary                 (d) ASSESSMENT OF HARBORS AND INLAND                    (2) in paragraph (5)(B), by striking ‘‘fiscal
                                            shall make expenditures to pay for operation             HARBORS.—Section 210(d)(2)(A)(ii) of the               year 2012’’ each place it appears and insert-
                                            and maintenance costs of the harbors and in-             Water Resources Development Act of 1986 (as            ing ‘‘each of the previous 3 fiscal years’’;
                                            land harbors referred to in subsection (a)(2),           so redesignated) is amended by striking ‘‘ex-             (3) by redesignating paragraph (8) as para-
                                            using—                                                   panded uses at eligible harbors or inland har-         graph (9) and inserting after paragraph (7)
                                              ‘‘(A) not less than 20 percent of such funds           bors referred to in subsection (d)(2)’’ and in-        the following:
                                            for emerging harbor projects, to the extent              serting ‘‘uses described in paragraphs (1)(C)             ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—
                                            there are identifiable operations and mainte-            and (3) of subsection (c)’’.                           The term ‘Harbor Maintenance Trust Fund’
                                            nance needs, including eligible breakwater                 (e) DEFINITIONS.—Section 210(e) of the               means the Harbor Maintenance Trust Fund
                                            and jetty needs, at such harbor projects;                Water Resources Development Act of 1986 (as            established by section 9505 of the Internal
                                              ‘‘(B) not less than 12 percent of such funds           so redesignated) is amended—                           Revenue Code of 1986.’’; and
                                            for projects that are located within the                   (1) by striking paragraphs (6) through (9);             (4) in paragraph (9), as so redesignated—
                                            Great Lakes Navigation System;                             (2) by redesignating paragraphs (3) through             (A) by amending subparagraph (B) to read
                                              ‘‘(C) 10 percent of such funds for expanded            (5) as paragraphs (4) through (6), respec-             as follows:
                                            uses carried out at donor ports, as such term            tively;                                                   ‘‘(B) at which the total amount of harbor
                                            is defined in section 2106 of the Water Re-                (3) by striking paragraph (2) and inserting          maintenance taxes collected (including the
                                            sources Reform and Development Act of 2014               the following:                                         estimated taxes related to domestic cargo
                                            (33 U.S.C. 2238c); and                                     ‘‘(2) EMERGING HARBOR.—The term ‘emerg-              and cruise passengers) comprise annually
                                              ‘‘(D) any remaining funds for operation and            ing harbor’ means a harbor or inland harbor            more than $5,000,000 but less than $15,000,000
                                            maintenance costs of any harbor or inland                referred to in subsection (a)(2) that transits         of the total funding of the Harbor Mainte-
                                            harbor referred to in subsection (a)(2) based            less than 1,000,000 tons of cargo annually.            nance Trust Fund in each of the previous 3
                                            on an equitable allocation of such funds                   ‘‘(3) EMERGING HARBOR PROJECT.—The term              fiscal years;’’;
                                            among such harbors and inland harbors.’’;                ‘emerging harbor project’ means a project                 (B) in subparagraph (C), by inserting ‘‘(in-
                                              (2) by amending paragraph (3) to read as               that is assigned to an emerging harbor.’’;             cluding the estimated taxes related to do-
                                            follows:                                                 and                                                    mestic cargo and cruise passengers)’’ after
                                              ‘‘(3) ADDITIONAL USES AT EMERGING HAR-                   (4) in paragraph (4) (as so redesignated), by        ‘‘taxes collected’’; and
                                            BORS.—                                                   adding at the end the following:                          (C) in subparagraph (D), by striking ‘‘fiscal
                                              ‘‘(A) IN GENERAL.—In each fiscal year, the               ‘‘(C) An in-water improvement, if the im-            year 2012’’ and inserting ‘‘each of the pre-
                                            Secretary may use not more than $5,000,000               provement—                                             vious 3 fiscal years’’.
                                            of funds designated for emerging harbor                    ‘‘(i) is for the seismic reinforcement of a             (b) REPORT TO CONGRESS; AUTHORIZATION OF
                                            projects under paragraph (1)(A) to pay for               wharf or other berthing structure, or the re-          APPROPRIATIONS.—Section 2106 of the Water
                                            the costs of up to 10 projects for mainte-               pair or replacement of a deteriorating wharf           Resources Reform and Development Act of




dlhill on DSK120RN23PROD with HOUSE
                                            nance dredging of a marina or berthing area,             or other berthing structure, at a port facil-          2014 (33 U.S.C. 2238c) is amended—
                                            in an emerging harbor, that includes an area             ity;                                                      (1) by striking subsection (e) and redesig-
                                            that is located adjacent to, or is accessible              ‘‘(ii) benefits commercial navigation at the         nating subsections (f) and (g) as subsections
                                            by, a Federal navigation project, subject to             harbor; and                                            (e) and (f), respectively; and
                                            subparagraphs (B) and (C) of this paragraph.               ‘‘(iii) is located in, or adjacent to, a berth          (2) in subsection (e), as so redesignated—
                                              ‘‘(B) ELIGIBLE EMERGING HARBORS.—The                   that is accessible to a Federal navigation                (A) in paragraph (1), by striking ‘‘2020’’ and
                                            Secretary may use funds as authorized under              project.                                               inserting ‘‘2030’’; and




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00046   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                     H3929
                                              (B) by striking paragraph (3).                         2021 through 2027, the Secretary shall                 ance to support flood risk resiliency plan-
                                            SEC. 105. ASSUMPTION OF MAINTENANCE OF A                 prioritize projects that are included in the           ning efforts of an economically disadvan-
                                                        LOCALLY PREFERRED PLAN.                      most recent 20-year program for making cap-            taged community.
                                              Section 204(f) of the Water Resources De-              ital investments developed under section               SEC. 111. PROJECT CONSULTATION.
                                            velopment Act of 1986 (33 U.S.C. 2232(f)) is             302(d) of the Water Resources Development                (a) REPORTS REQUIRED.—Not later than 180
                                            amended to read as follows:                              Act of 1986 (33 U.S.C. 2251(d)).                       days after the date of enactment of this Act,
                                              ‘‘(f) OPERATION AND MAINTENANCE.—                      SEC.   109. IMPLEMENTATION OF WATER RE-                the Secretary shall submit the following re-
                                              ‘‘(1) ASSUMPTION OF MAINTENANCE.—When-                              SOURCES PRINCIPLES AND RE-                ports:
                                            ever a non-Federal interest carries out im-                           QUIREMENTS.                                 (1) The report required under section 1214
                                            provements to a federally authorized harbor                  (a) IN GENERAL.—Not later than 180 days            of the Water Resources Development Act of
                                            or inland harbor, the Secretary shall be re-             after the date of enactment of this Act, the           2018 (132 Stat. 3809).
                                            sponsible for operation and maintenance in               Secretary shall issue final agency-specific              (2) The report required under section
                                            accordance with section 101(b) if—                       procedures necessary to implement the prin-            1120(a)(3) of the Water Resources Develop-
                                              ‘‘(A) before construction of the improve-              ciples and requirements and the interagency            ment Act of 2016 (130 Stat. 1643).
                                            ments—                                                   guidelines.                                              (b) CONSULTATION.—
                                              ‘‘(i) the Secretary determines that the im-               (b) DEVELOPMENT OF FUTURE WATER RE-                   (1) AGENCIES AND TRIBES.—The Secretary
                                            provements are feasible and consistent with              SOURCES DEVELOPMENT PROJECTS.—The pro-                 shall ensure that all covered community
                                            the purposes of this title; and                          cedures required by subsection (a) shall en-           consultation policies, regulations, and guid-
                                              ‘‘(ii) the Secretary and the non-Federal in-           sure that the Secretary, in the formulation            ance of the Corps of Engineers continue to be
                                            terest execute a written agreement relating              of future water resources development                  implemented, and that consultations with
                                            to operation and maintenance of the im-                  projects—                                              Federal and State agencies and Indian Tribes
                                            provements;                                                 (1) develops such projects in accordance            required for a water resources development
                                              ‘‘(B) the Secretary certifies that the                 with—                                                  project are carried out.
                                            project or separable element of the project is              (A) the guiding principles established by             (2) COMMUNITIES.—The Secretary shall en-
                                            constructed in accordance with applicable                the principles and requirements; and                   sure that any covered communities, includ-
                                            permits and appropriate engineering and de-                 (B) the national water resources planning           ing such communities identified in the re-
                                            sign standards; and                                      policy established by section 2031(a) of the           ports submitted under subsection (a), that
                                              ‘‘(C) the Secretary does not find that the             Water Resources Development Act of 2007 (42            are found to be disproportionately or ad-
                                            project or separable element is no longer fea-           U.S.C. 1962–3(a)); and                                 versely affected are included in consultation
                                            sible.                                                      (2) fully identifies and analyzes national          policies, regulations, and guidance of the
                                              ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN               economic development benefits, regional                Corps of Engineers.
                                            THE COSTS OF A LOCALLY PREFERRED PLAN.—                  economic development benefits, environ-                  (3) PROJECT PLANNING AND CONSTRUCTION.—
                                            In the case of improvements determined by                mental quality benefits, and other societal            The Secretary shall ensure that covered
                                            the Secretary pursuant to paragraph (1)(A)(i)            effects.                                               communities are consulted in the develop-
                                            to deviate from the national economic devel-                (c) REVIEW AND UPDATE.—Every 5 years,               ment of water resources development project
                                            opment plan, the Secretary shall be respon-              the Secretary shall review and, where appro-           planning and construction, for the purposes
                                            sible for all operation and maintenance costs            priate, revise the procedures required by sub-         of achieving environmental justice and ad-
                                            of such improvements, as described in sec-               section (a).                                           dressing any disproportionate or adverse ef-
                                            tion 101(b), including costs in excess of the               (d) PUBLIC REVIEW, NOTICE, AND COM-                 fects on such communities.
                                            costs of the national economic development               MENT.—In issuing, reviewing, and revising                (c) ENVIRONMENTAL JUSTICE UPDATES.—
                                            plan, if the Secretary determines that the               the procedures required by this section, the             (1) IN GENERAL.—Not later than 1 year after
                                            improvements satisfy the requirements of                 Secretary shall—                                       the date of enactment of this Act, the Sec-
                                            paragraph (1).’’.                                           (1) provide notice to interested non-Fed-           retary shall update any policies, regulations,
                                            SEC. 106. COAST GUARD ANCHORAGES.                        eral stakeholders of the Secretary’s intent to         and guidance of the Corps of Engineers re-
                                                                                                     revise the procedures;                                 lated to achieving environmental justice for
                                              The Secretary is authorized to perform
                                                                                                        (2) provide opportunities for interested            covered communities.
                                            dredging at Federal expense within and adja-
                                                                                                     non-Federal stakeholders to engage with,                 (2) RECOMMENDATIONS AND CONSULTATION.—
                                            cent to anchorages on the Columbia River
                                                                                                     and provide input and recommendations to,              In carrying out paragraph (1), the Secretary
                                            established by the Coast Guard pursuant to
                                                                                                     the Secretary on the revision of the proce-            shall—
                                            section 7 of the Act of March 14, 1915 (33
                                                                                                     dures; and                                               (A) consult with a wide array of represent-
                                            U.S.C. 471), to provide safe anchorage for
                                                                                                        (3) solicit and consider public and expert          atives of covered communities; and
                                            deep draft vessels commensurate with the
                                                                                                     comments.                                                (B) use the recommendations from the re-
                                            authorized Federal navigation channel
                                                                                                        (e) DEFINITIONS.—In this section:                   ports submitted under subsection (a).
                                            depth, including advanced maintenance.                                                                            (d) COMMUNITY ENGAGEMENT.—The Sec-
                                            SEC. 107. STATE CONTRIBUTION OF FUNDS FOR                   (1) INTERAGENCY GUIDELINES.—The term
                                                                                                     ‘‘interagency guidelines’’ means the inter-            retary shall ensure that in carrying out au-
                                                        CERTAIN OPERATION AND MAINTE-
                                                                                                                                                            thorized     water     resources   development
                                                        NANCE COSTS.                                 agency guidelines contained in the document
                                                                                                                                                            projects in, and all other activities of the
                                              In carrying out eligible operations and                finalized by the Council on Environmental
                                                                                                                                                            Corps of Engineers related to, covered com-
                                            maintenance activities within the Great                  Quality pursuant to section 2031 of the Water
                                                                                                                                                            munities, the Corps of Engineers—
                                            Lakes Navigation System pursuant to sec-                 Resources Development Act of 2007 (42 U.S.C.
                                                                                                                                                              (1) promotes the meaningful involvement
                                            tion 210 of the Water Resources Development              1962–3) in December 2014, to implement the
                                                                                                                                                            of such communities in the project develop-
                                            Act of 1986 (33 U.S.C. 2238) in a State that has         principles and requirements.
                                                                                                                                                            ment and implementation, enforcement ef-
                                            implemented any additional State limitation                 (2) PRINCIPLES AND REQUIREMENTS.—The
                                                                                                                                                            forts, and other activities of the Corps of En-
                                            on the disposal of dredged material in the               term ‘‘principles and requirements’’ means
                                                                                                                                                            gineers;
                                            open waters of such State, the Secretary                 the principles and requirements contained in
                                                                                                                                                              (2) provides guidance and technical assist-
                                            may, pursuant to section 5 of the Act of June            the document prepared by the Council on En-
                                                                                                                                                            ance to such communities to increase under-
                                            22, 1936 (33 U.S.C. 701h), receive from such             vironmental Quality pursuant to section 2031
                                                                                                                                                            standing of the project development and im-
                                            State, and expend, such funds as may be con-             of the Water Resources Development Act of
                                                                                                                                                            plementation activities, regulations, and
                                            tributed by the State to cover the additional            2007 (42 U.S.C. 1962–3), entitled ‘‘Principles
                                                                                                                                                            policies of the Corps of Engineers; and
                                            costs for operations and maintenance activi-             and Requirements for Federal Investments
                                                                                                                                                              (3) cooperates with State, Tribal, and local
                                            ties for a harbor or inland harbor within                in Water Resources’’, and dated March 2013.
                                                                                                                                                            governments with respect to activities car-
                                            such State that result from such limitation.             SEC. 110. RESILIENCY PLANNING ASSISTANCE.              ried out pursuant to this subsection.
                                            SEC. 108. INLAND WATERWAY PROJECTS.                        (a) IN GENERAL.—Section 206(a) of the                  (e) TRIBAL LANDS AND CONSULTATION.—The
                                              (a) IN GENERAL.—Notwithstanding section                Flood Control Act of 1960 (33 U.S.C. 709a(a))          Secretary shall ensure that in carrying out
                                            102 of the Water Resources Development Act               is amended by inserting ‘‘, to avoid repet-            authorized water resources development
                                            of 1986 (33 U.S.C. 2212), 35 percent of the costs        itive flooding impacts, to anticipate, pre-            projects and in all other activities of the
                                            of construction of any project for navigation            pare, and adapt to changing climatic condi-            Corps of Engineers, that the Corps of Engi-
                                            on the inland waterways shall be paid from               tions and extreme weather events, and to               neers—
                                            amounts appropriated from the Inland Wa-                 withstand, respond to, and recover rapidly               (1)(A) consults with Indian Tribes specifi-
                                            terways Trust Fund—                                      from disruption due to the flood hazards’’             cally on any Tribal lands near or adjacent to
                                              (1) during each of fiscal years 2021 through           after ‘‘in planning to ameliorate the flood            any activities of the Corps of Engineers, for




dlhill on DSK120RN23PROD with HOUSE
                                            2027; and                                                hazard’’.                                              purposes of identifying lands of ancestral,
                                              (2) for a project the construction of which              (b) PRIORITIZING FLOOD RISK RESILIENCY               cultural, or religious importance; and
                                            is initiated during such period, in each fiscal          TECHNICAL ASSISTANCE FOR ECONOMICALLY                    (B) cooperates with Indian Tribes to avoid,
                                            year until such construction is complete.                DISADVANTAGED COMMUNITIES.—In carrying                 or otherwise find alternate solutions with re-
                                              (b) PRIORITIZATION.—In selecting projects              out section 206 of the Flood Control Act of            spect to, such lands; and
                                            described in subsection (a) for which to ini-            1960 (33 U.S.C. 709a), the Secretary shall               (2)(A) consults with Indian Tribes specifi-
                                            tiate construction during any of fiscal years            prioritize the provision of technical assist-          cally on any Tribal areas near or adjacent to




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00047   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3930                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                            any activities of the Corps of Engineers, for            STRUCTURAL, NATURAL,           OR      NATURE-BASED     flood risk management project in a seismic
                                            purposes of identifying lands, waters, and               FEATURES’’; and                                         hazard zone for purposes of plan formulation
                                            other resources critical to the livelihood of              (2) in paragraph (1)—                                 pursuant to section 905 of the Water Re-
                                            the Indian Tribes; and                                     (A) by striking ‘‘nonstructural flood con-            sources Development Act of 1986; and
                                              (B) cooperates with Indian Tribes to avoid,            trol measures’’ and inserting ‘‘a flood risk              (2) seek to maximize the combination of
                                            or otherwise find alternate solutions with re-           management or hurricane and storm damage                flood risk reduction and seismic hazard risk
                                            spect to, such areas.                                    risk reduction measure using a non-                     reduction benefits in the formulation of the
                                              (f) DEFINITIONS.—In this section:                      structural feature, or a natural feature or             national economic development alternative
                                              (1) COMMUNITY OF COLOR.—The term ‘‘com-                nature-based feature (as those terms are de-            for such project.
                                            munity of color’’ means a community of in-               fined in section 1184(a) of the Water Re-               SEC. 118. FEDERAL INTEREST DETERMINATION.
                                            dividuals who are—                                       sources Development Act of 2016 (33 U.S.C.                Section 905 of the Water Resources Devel-
                                              (A) American Indian or Alaska Native;                  2289a(a))),’’; and                                      opment Act of 1986 (33 U.S.C. 2282) is amend-
                                              (B) Asian or Pacific Islander;                           (B) by striking ‘‘cash during construction            ed by inserting after subsection (a) the fol-
                                              (C) Black, not of Hispanic origin; or                  of the project’’ and inserting ‘‘cash during            lowing:
                                              (D) Hispanic.                                          construction for a nonstructural feature if               ‘‘(b) FEDERAL INTEREST DETERMINATION.—
                                              (2) COVERED COMMUNITY.—The term ‘‘cov-                 the costs of land, easements, rights-of-way,              ‘‘(1) IN GENERAL.—In preparing a feasibility
                                            ered community’’ means each of the fol-                  dredged material disposal areas, and reloca-            report under subsection (a) for a study that
                                            lowing:                                                  tions for such feature are estimated to ex-             will benefit an economically disadvantaged
                                              (A) A community of color.                              ceed 35 percent’’.                                      community, upon request by the non-Federal
                                              (B) An economically disadvantaged com-                 SEC. 115. FEASIBILITY STUDIES; REVIEW OF NAT-           interest for the study, the Secretary shall
                                            munity.                                                              URAL AND NATURE-BASED FEA-
                                                                                                                 TURES.
                                                                                                                                                             first determine the Federal interest in car-
                                              (C) A rural community.
                                                                                                       (a) TECHNICAL CORRECTION.—Section 1149(c)             rying out the study and the projects that
                                              (D) A Tribal or indigenous community.
                                                                                                     of the Water Resources Development Act of               may be proposed in the study.
                                              (3) STATE.—The term ‘‘State’’ means each
                                                                                                     2018 (33 U.S.C. 2282 note; 132 Stat. 3787) is             ‘‘(2) COST SHARE.—The costs of a deter-
                                            of the several States, the District of Colum-
                                                                                                     amended by striking ‘‘natural infrastructure            mination under paragraph (1)—
                                            bia, and each of the commonwealths, terri-
                                                                                                     alternatives’’ and inserting ‘‘natural feature            ‘‘(A) shall be at Federal expense; and
                                            tories, and possessions of the United States.
                                                                                                     or nature-based feature alternatives (as such             ‘‘(B) shall not exceed $200,000.
                                            SEC. 112. REVIEW OF RESILIENCY ASSESSMENTS.
                                                                                                     terms are defined in section 1184 of the Water            ‘‘(3) DEADLINE.—A determination under
                                              (a) RESILIENCY ASSESSMENT.—                                                                                    paragraph (1) shall be completed by not later
                                              (1) IN GENERAL.—Not later than 180 days                Resources Development Act of 2016 (32 U.S.C.
                                                                                                     2289a))’’.                                              than 120 days after the date on which funds
                                            after the date of enactment of this section,                                                                     are made available to the Secretary to carry
                                            and in conjunction with the development of                 (b) SUMMARY OF ANALYSIS.—To the max-
                                                                                                     imum extent practicable, the Secretary shall            out the determination.
                                            procedures under section 109 of this Act, the                                                                      ‘‘(4) TREATMENT.—
                                                                                                     include in each feasibility report developed
                                            Secretary is directed to review, and where                                                                         ‘‘(A) TIMING.—The period during which a
                                                                                                     under section 905 of the Water Resources De-
                                            appropriate, revise the existing planning                                                                        determination is being completed under
                                                                                                     velopment Act of 1986 (33 U.S.C. 2282) for a
                                            guidance documents and regulations on the                                                                        paragraph (1) for a study shall not be in-
                                                                                                     project that contains a flood risk manage-
                                            assessment of the effects of sea level rise on                                                                   cluded for purposes of the deadline to com-
                                                                                                     ment or hurricane and storm damage risk re-
                                            future water resources development projects                                                                      plete a final feasibility report under section
                                                                                                     duction element, a summary of the natural
                                            to ensure that such guidance documents and                                                                       1001(a)(1) of the Water Resources Reform and
                                                                                                     feature or nature-based feature alternatives
                                            regulations are based on the best available,                                                                     Development Act of 2014 (33 U.S.C.
                                                                                                     that were evaluated in the development of
                                            peer-reviewed science and data on the cur-                                                                       2282c(a)(1)).
                                                                                                     the feasibility report, and, if such alter-
                                            rent and future effects of sea level rise on                                                                       ‘‘(B) COST.—The cost of a determination
                                                                                                     natives were not included in the rec-
                                            coastal communities.                                                                                             under paragraph (1) shall not be included for
                                                                                                     ommended plan, an explanation of why such
                                              (2) COORDINATION.—In carrying out this                                                                         purposes of the maximum Federal cost under
                                            subsection, the Secretary shall—                         alternatives were not included into the rec-
                                                                                                     ommended plan.                                          section 1001(a)(2) of the Water Resources Re-
                                              (A) coordinate the review with the Engi-                                                                       form and Development Act of 2014 (33 U.S.C.
                                                                                                     SEC. 116. REPORT ON CORROSION PREVENTION
                                            neer Research and Development Center,                                                                            2282c(a)(2)).
                                                                                                                 ACTIVITIES.
                                            other Federal and State agencies, and other                                                                        ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If,
                                                                                                       Not later than 180 days after the date of
                                            relevant entities; and                                                                                           based on a determination under paragraph
                                                                                                     enactment of this Act, the Secretary shall
                                              (B) to the maximum extent practicable and                                                                      (1), the Secretary determines that a study or
                                                                                                     submit to the Committee on Transportation
                                            where appropriate, utilize data provided to                                                                      project is not in the Federal interest because
                                                                                                     and Infrastructure of the House of Rep-
                                            the Secretary by such agencies.                                                                                  the project will not result, or is unlikely to
                                                                                                     resentatives and the Committee on Environ-
                                              (b) ASSESSMENT OF BENEFITS OF SEA LEVEL                                                                        result, in a recommended plan that will
                                                                                                     ment and Public Works of the Senate, and
                                            RISE RESILIENCY IN FEASIBILITY REPORTS.—                                                                         produce national economic development ben-
                                                                                                     make publicly available, a report that de-
                                              (1) IN GENERAL.—Upon the request of a non-                                                                     efits greater than cost, but may result in a
                                                                                                     scribes—
                                            Federal interest, in carrying out a feasibility                                                                  technically sound and environmentally ac-
                                                                                                       (1) the extent to which the Secretary has
                                            study for a project for flood risk mitigation,                                                                   ceptable plan that is otherwise consistent
                                                                                                     carried out section 1033 of the Water Re-
                                            hurricane and storm damage risk reduction,                                                                       with section 904 of the Water Resources De-
                                                                                                     sources Reform and Development Act of 2014
                                            or ecosystem restoration under section 905 of                                                                    velopment Act of 1986 (33 U.S.C. 2281), the
                                                                                                     (33 U.S.C. 2350);
                                            the Water Resources Development Act of                                                                           Secretary shall issue a report to the non-
                                                                                                       (2) the extent to which the Secretary has
                                            1986 (33 U.S.C. 2282), the Secretary shall con-                                                                  Federal interest with recommendations on
                                                                                                     incorporated corrosion prevention activities
                                            sider whether the need for the project is                                                                        how the non-Federal interest might modify
                                                                                                     (as defined in such section) at water re-
                                            predicated upon or exacerbated by conditions                                                                     the proposal such that the project could be
                                                                                                     sources development projects constructed or
                                            related to sea level rise.                                                                                       in the Federal interest and feasible.’’.
                                                                                                     maintained by the Secretary since the date
                                              (2) SEA LEVEL RISE RESILIENCY BENEFITS.—
                                                                                                     of enactment of such section; and                       SEC. 119. ECONOMICALLY DISADVANTAGED COM-
                                            To the maximum extent practicable, in car-                                                                                   MUNITY FLOOD PROTECTION AND
                                                                                                       (3) in instances where the Secretary has
                                            rying out a study pursuant to paragraph (1),                                                                                 HURRICANE AND STORM DAMAGE
                                                                                                     not incorporated corrosion prevention ac-
                                            the Secretary shall document the potential                                                                                   REDUCTION STUDY PILOT PRO-
                                                                                                     tivities at such water resources development
                                            effects of sea level rise on the project, and                                                                                GRAM.
                                                                                                     projects since such date, an explanation as
                                            benefits of the project relating to sea level                                                                      (a) IN GENERAL.—Not later than 180 days
                                                                                                     to why such corrosion prevention activities
                                            rise, during the 50-year period after the date                                                                   after the date of enactment of this Act, the
                                                                                                     have not been incorporated.
                                            of completion of the project.                                                                                    Secretary shall establish and implement a
                                                                                                     SEC. 117. QUANTIFICATION OF BENEFITS FOR
                                            SEC. 113. SMALL FLOOD CONTROL PROJECTS.                                                                          pilot program to evaluate opportunities to
                                                                                                                FLOOD     RISK     MANAGEMENT
                                              Section 205 of the Flood Control Act of 1948                      PROJECTS IN SEISMIC ZONES.                   address the flood risk management and hur-
                                            (33 U.S.C. 701s) is amended by inserting ‘‘,               (a) IN GENERAL.—Upon the request of the               ricane and storm damage risk reduction
                                            and projects that use natural features or na-            non-Federal interest for a flood risk manage-           needs of economically disadvantaged com-
                                            ture-based features (as those terms are de-              ment project in a seismic zone, the Secretary           munities.
                                            fined in section 1184(a) of the Water Re-                shall quantify the seismic hazard risk reduc-             (b) PARTICIPATION IN PILOT PROGRAM.—In
                                            sources Development Act of 2016 (33 U.S.C.               tion benefits for the project if the non-Fed-           carrying out subsection (a), the Secretary
                                            2289a(a))),’’ after ‘‘nonstructural projects’’.          eral interest identifies, and the Secretary             shall—




dlhill on DSK120RN23PROD with HOUSE
                                            SEC. 114. CONFORMING AMENDMENT.                          approves, an acceptable methodology to                    (1) publish a notice in the Federal Register
                                              Section 103(b) of the Water Resources De-              quantify such benefits.                                 that requests from non-Federal interests
                                            velopment Act of 1986 (33 U.S.C. 2213) is                  (b) APPLICABILITY.—The Secretary shall—               proposals for the potential feasibility study
                                            amended—                                                   (1) include all associated seismic hazard             of a flood risk management project or hurri-
                                              (1) in the subsection heading, by striking             risk reduction benefits approved by the Sec-            cane and storm damage risk reduction
                                            ‘‘NONSTRUCTURAL FLOOD CONTROL PROJECTS’’                 retary in the calculation of the national eco-          project for an economically disadvantaged
                                            and inserting ‘‘PROJECTS USING NON-                      nomic development benefit-cost ratio for a              community;




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00048   Fmt 4634   Sfmt 0634    E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                     H3931
                                              (2) upon request of a non-Federal interest             Works of the Senate, and make publicly                   (C) FINANCING.—
                                            for such a project, provide technical assist-            available, a report detailing the results of             (i) CONTRIBUTIONS.—If, based on a study
                                            ance to such non-Federal interest in the for-            the pilot program carried out under this sec-          carried out pursuant to paragraph (1), the
                                            mulation of a proposal for a potential feasi-            tion, including—                                       Secretary determines that a project de-
                                            bility study to be submitted to the Secretary              (1) a description of proposals received from         scribed in paragraph (1) will not produce ben-
                                            under the pilot program; and                             non-Federal interests pursuant to subsection           efits greater than cost, the Secretary shall
                                              (3) review such proposals and select 10 fea-           (b)(1);                                                allow the affected community to pay, or pro-
                                            sibility studies for such projects to be car-              (2) a description of technical assistance            vide contributions equal to, an amount suffi-
                                            ried out by the Secretary, in coordination               provided to non-Federal interests under sub-           cient to make the remaining costs of design
                                            with the non-Federal interest, under this                section (b)(2); and                                    and construction of the project equal to the
                                            pilot program.                                             (3) a description of proposals selected              estimated value of the benefits of the
                                              (c) SELECTION CRITERIA.—In selecting a fea-            under subsection (b)(3) and criteria used to           project.
                                            sibility study under subsection (b)(3), the              select such proposals.                                   (ii) EFFECT ON NON-FEDERAL SHARE.—
                                            Secretary shall consider whether—                          (k) STATE DEFINED.—In this section, the              Amounts provided by an affected community
                                              (1) the percentage of people living in pov-            term ‘‘State’’ means each of the several               under clause (i) shall be in addition to any
                                            erty in the county or counties (or county-               States, the District of Columbia, and each of          payments or contributions the affected com-
                                            equivalent entity or entities) in which the              the commonwealths, territories, and posses-            munity is required to provide toward the re-
                                            project is located is above the percentage of            sions of the United States.                            maining costs of design and construction of
                                            people living in poverty in the State, based             SEC. 120. PERMANENT MEASURES TO REDUCE                 the project under section 103 of the Water
                                            on census bureau data;                                              EMERGENCY      FLOOD     FIGHTING
                                                                                                                                                            Resources Development Act of 1986 (33 U.S.C.
                                                                                                                NEEDS FOR COMMUNITIES SUBJECT
                                              (2) the percentage of families with income                        TO REPETITIVE FLOODING.                     2213).
                                            above the poverty threshold but below the                                                                         (4) ABILITY TO PAY.—
                                                                                                       (a) DEFINITIONS.—In this section:
                                            average household income in the county or                                                                         (A) IN GENERAL.—Any cost-sharing agree-
                                                                                                       (1) AFFECTED COMMUNITY.—The term ‘‘af-
                                            counties (or county-equivalent entity or en-                                                                    ment for a project entered into pursuant to
                                                                                                     fected community’’ means a legally con-
                                            tities) in which the project is located is                                                                      this section shall be subject to the ability of
                                                                                                     stituted public body (as that term is used in
                                            above the percentage of the same for the                                                                        the affected community to pay.
                                                                                                     section 221(b) of the Flood Control Act of
                                            State, based on census bureau data;                                                                               (B) DETERMINATION.—The ability of any af-
                                                                                                     1970 (42 U.S.C. 1962d–5b(b))—
                                              (3) the percentage of the population that                                                                     fected community to pay shall be deter-
                                                                                                       (A) with jurisdiction over an area that has
                                            identifies as belonging to a minority or in-                                                                    mined by the Secretary in accordance with
                                                                                                     been subject to flooding in two or more
                                            digenous group in the county or counties (or                                                                    procedures established by the Secretary.
                                                                                                     events in any 10-year period; and
                                            county-equivalent entity or entities) in                                                                          (C) EFFECT OF REDUCTION.—Any reduction
                                                                                                       (B) that has received emergency flood-
                                            which the project is located is above the av-                                                                   in the non-Federal share of the cost of a
                                                                                                     fighting assistance, including construction
                                            erage percentage in the State, based on cen-                                                                    project described in paragraph (1) as a result
                                                                                                     of temporary barriers by the Secretary,
                                            sus bureau data; and                                                                                            of a determination under this paragraph
                                                                                                     under section 5 of the Act of August 18, 1941
                                              (4) the project is addressing flooding or                                                                     shall not be included in the Federal share for
                                                                                                     (33 U.S.C. 701n) with respect to such flood
                                            hurricane or storm damage effects that have                                                                     purposes of subparagraphs (A) and (B) of
                                                                                                     events.
                                            a disproportionate impact on a rural commu-                                                                     paragraph (3).
                                                                                                       (2) NATURAL FEATURE; NATURE-BASED FEA-
                                            nity or a community of color (as such term                                                                      SEC. 121. EMERGENCY RESPONSE TO NATURAL
                                                                                                     TURE.—The terms ‘‘natural feature’’ and ‘‘na-
                                            is defined in section 111 of this Act), includ-                                                                            DISASTERS.
                                                                                                     ture-based feature’’ have the meanings given
                                            ing Tribal or indigenous peoples.                                                                                 (a) IN GENERAL.—Section 5 of the Act of
                                                                                                     those terms in section 1184 of the Water Re-
                                              (d) ADMINISTRATION.—Notwithstanding the
                                                                                                     sources Development Act of 2016 (33 U.S.C.             August 18, 1941 (33 U.S.C. 701n) is amended—
                                            requirements of section 105(a)(1)(A) of the
                                                                                                     2289a).                                                  (1) in subsection (a), by adding at the end
                                            Water Resources Development Act of 1986 (33
                                                                                                       (b) PROGRAM.—                                        the following—
                                            U.S.C. 2215), the Federal share of the cost of
                                                                                                       (1) IN GENERAL.—The Secretary is author-               ‘‘(5) FEASIBILITY STUDY.—
                                            a feasibility study carried out under the
                                                                                                     ized to carry out a program to study, design,            ‘‘(A) DETERMINATION.—Not later than 180
                                            pilot program shall be 100 percent.
                                                                                                     and construct water resources development              days after receiving, from a non-Federal
                                              (e) GEOGRAPHIC DIVERSITY.—When select-
                                                                                                     projects through measures involving, among             sponsor of a project to repair or rehabilitate
                                            ing feasibility studies under subsection
                                                                                                     other things, strengthening, raising, extend-          a flood control work described in paragraph
                                            (b)(3), the Secretary shall consider the geo-
                                                                                                     ing, realigning, or otherwise modifying ex-            (1), a request to initiate a feasibility study
                                            graphic diversity among proposed projects.
                                              (f)    STUDY     REQUIREMENTS.—Feasibility             isting flood control works, designing new              to further modify the relevant flood control
                                            studies carried out under this subsection                works, and incorporating natural features,             work to provide for an increased level of pro-
                                            shall, to the maximum extent practical, in-              nature-based features, or nonstructural fea-           tection, the Secretary shall provide to the
                                            corporate natural features or nature-based               tures, as appropriate to provide flood and             non-Federal sponsor a written decision on
                                            features (as such terms are defined in section           coastal storm risk management to affected              whether the Secretary has the authority
                                            1184 of the Water Resources Development                  communities.                                           under section 216 of the Flood Control Act of
                                            Act of 2016 (33 U.S.C. 2289a)), or a combina-              (2) CONSIDERATIONS.—In carrying out para-            1970 (33 U.S.C. 549a) to undertake the re-
                                            tion of such features and nonstructural fea-             graph (1), the Secretary shall, to the max-            quested feasibility study.
                                            tures, that avoid or reduce at least 50 per-             imum extent practical, review and, where                 ‘‘(B) RECOMMENDATION.—If the Secretary
                                            cent of flood or storm damages in one or                 appropriate, incorporate natural features or           determines under subparagraph (B) that the
                                            more of the alternatives included in the final           nature-based features, or a combination of             Secretary does not have the authority to un-
                                            alternatives evaluated.                                  such features and nonstructural features,              dertake the requested feasibility study, the
                                              (g) NOTIFICATION.—The Secretary shall no-              that avoid or reduce at least 50 percent of            Secretary shall include the request for a fea-
                                            tify the Committee on Transportation and                 flood or storm damages in one or more of the           sibility study in the annual report submitted
                                            Infrastructure of the House of Representa-               alternatives included in the final alter-              under section 7001 of the Water Resources
                                            tives and the Committee on Environment                   natives evaluated.                                     Reform and Development Act of 2014.’’;
                                            and Public Works of the Senate of the selec-               (3) CONSTRUCTION.—                                     (2) in subsection (c)—
                                            tion of each feasibility study under the pilot             (A) IN GENERAL.—The Secretary may carry                (A) in the subsection heading, by striking
                                            program.                                                 out a project described in paragraph (1) with-         ‘‘LEVEE OWNERS MANUAL’’ and inserting
                                              (h) COMPLETION.—Upon completion of a                   out further congressional authorization if—            ‘‘ELIGIBILITY’’;
                                            feasibility report for a feasibility study se-             (i) the Secretary determines that the                  (B) in paragraph (1), in the heading, by
                                            lected to be carried out under this section,             project—                                               striking ‘‘IN GENERAL’’ and inserting ‘‘LEVEE
                                            the Secretary shall transmit the report to                 (I) is advisable to reduce the risk of flood-        OWNER’S MANUAL’’;
                                            Congress for authorization, and shall include            ing for an affected community; and                       (C) by redesignating paragraphs (2) and (3)
                                            the report in the next annual report sub-                  (II) produces benefits that are in excess of         as paragraphs (3) and (4), respectively, and
                                            mitted under section 7001 of the Water Re-               the estimated costs; and                               inserting after paragraph (1) the following:
                                            sources Reform and Development Act of 2014                 (ii) the Federal share of the cost of the              ‘‘(2) COMPLIANCE.—
                                            (33 U.S.C. 2282d).                                       construction does not exceed $15,000,000.                ‘‘(A) IN GENERAL.—Notwithstanding the
                                              (i) SUNSET.—The authority to commence a                  (B) SPECIFIC AUTHORIZATION.—If the Fed-              status of compliance of a non-Federal inter-
                                            feasibility study under this section shall ter-          eral share of the cost of a project described          est with the requirements of a levee owner’s
                                            minate on the date that is 10 years after the            in paragraph (1) exceeds $15,000,000, the Sec-         manual described in paragraph (1), or with




dlhill on DSK120RN23PROD with HOUSE
                                            date of enactment of this Act.                           retary shall submit the project recommenda-            any other eligibility requirement established
                                              (j) REPORT.—Not later than 5 years and 10              tion to Congress for authorization prior to            by the Secretary related to the maintenance
                                            years after the date of enactment of this                construction, and shall include the project            and upkeep responsibilities of the non-Fed-
                                            Act, the Secretary shall submit to the Com-              recommendation in the next annual report               eral interest, the Secretary shall consider
                                            mittee on Transportation and Infrastructure              submitted under section 7001 of the Water              the non-Federal interest to be eligible for re-
                                            of the House of Representatives and the                  Resources Reform and Development Act of                pair and rehabilitation assistance under this
                                            Committee on Environment and Public                      2014.                                                  section if the non-Federal interest—




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00049   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3932                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                               ‘‘(i) enters into a written agreement with            features by the Corps of Engineers in car-             SEC. 124. SENSE OF CONGRESS ON MULTIPUR-
                                            the Secretary that identifies any items of de-           rying out feasibility studies and projects.                        POSE PROJECTS.
                                            ferred or inadequate maintenance and up-                 SEC. 123. REVIEW OF CORPS OF ENGINEERS AS-               It is the sense of Congress that the Sec-
                                            keep identified by the Secretary prior to the                        SETS.                                      retary, in coordination with non-Federal in-
                                            natural disaster; and                                      Section 6002 of the Water Resources Re-              terests, should maximize the development,
                                               ‘‘(ii) pays, during performance of the repair         form and Development Act of 2014 (128 Stat.            evaluation, and recommendation of project
                                            and rehabilitation work, all costs to ad-                1349) is amended to read as follows:                   alternatives for future water resources devel-
                                            dress—                                                   ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS AS-          opment projects that produce multiple
                                               ‘‘(I) any items of deferred or inadequate                           SETS.                                    project benefits, such as navigation, flood
                                            maintenance and upkeep identified by the                    ‘‘(a) ASSESSMENT.—The Secretary shall               risk management, and ecosystem restoration
                                                                                                     conduct an assessment of projects con-                 benefits, including through the use of nat-
                                            Secretary; and
                                                                                                     structed by the Secretary for which the Sec-           ural or nature-based features and the bene-
                                               ‘‘(II) any repair or rehabilitation work nec-
                                                                                                     retary continues to have financial or oper-            ficial reuse of dredged material.
                                            essary to address damage the Secretary at-
                                                                                                     ational responsibility.                                SEC. 125. BENEFICIAL REUSE OF DREDGED MA-
                                            tributes to such deferred or inadequate                                                                                     TERIAL; DREDGED MATERIAL MAN-
                                            maintenance or upkeep.                                     ‘‘(b) INVENTORY.—Not later than 18 months
                                                                                                                                                                        AGEMENT PLANS.
                                               ‘‘(B) ELIGIBILITY.—The Secretary may only             after the date of enactment of the Water Re-
                                                                                                     sources Development Act of 2020, the Sec-                (a) NATIONAL POLICY ON THE BENEFICIAL
                                            enter into one agreement under subpara-                                                                         REUSE OF DREDGED MATERIAL.—
                                            graph (A) with any non-Federal interest.                 retary shall, based on the assessment carried
                                                                                                     out under subsection (a), develop an inven-              (1) IN GENERAL.—It is the policy of the
                                               ‘‘(C) SUNSET.—The authority of the Sec-                                                                      United States for the Corps of Engineers to
                                            retary to enter into agreements under para-              tory of projects or portions of projects—
                                                                                                       ‘‘(1) that are not needed for the missions of        maximize the beneficial reuse, in an environ-
                                            graph (2) shall terminate on the date that is                                                                   mentally acceptable manner, of suitable
                                            5 years after the date of enactment of this              the Corps of Engineers;
                                                                                                       ‘‘(2) the modification of which, including           dredged material obtained from the con-
                                            paragraph.’’; and                                                                                               struction or operation and maintenance of
                                               (D) in paragraph (3) (as so redesignated), by         though the use of natural features or nature-
                                                                                                                                                            water resources development projects.
                                            striking ‘‘this subsection’’ and inserting               based features (as those terms are defined in
                                                                                                                                                              (2) PLACEMENT OF DREDGED MATERIALS.—
                                            ‘‘paragraph (1)’’.                                       section 1184(a) of the Water Resources Devel-
                                                                                                                                                              (A) IN GENERAL.—In evaluating the place-
                                                                                                     opment Act of 2016 (33 U.S.C. 2289a(a)), could
                                            SEC. 122. STUDY ON NATURAL INFRASTRUCTURE                                                                       ment of dredged material obtained from the
                                                                                                     improve the sustainable operations of the
                                                        AT    CORPS   OF    ENGINEERS                                                                       construction or operation and maintenance
                                                        PROJECTS.                                    project, or reduce operation and mainte-
                                                                                                                                                            of water resources development projects, the
                                                                                                     nance costs for the project; or
                                              (a) DEFINITION OF NATURAL FEATURE AND                                                                         Secretary shall consider—
                                                                                                       ‘‘(3) that are no longer having project pur-
                                            NATURE-BASED FEATURE.—In this section, the                                                                        (i) the suitability of the dredged material
                                                                                                     poses adequately met by the Corps of Engi-
                                            terms ‘‘natural feature’’ and ‘‘nature-based                                                                    for a full range of beneficial uses; and
                                                                                                     neers, because of deferment of maintenance
                                            feature’’ have the meanings given those                                                                           (ii) the economic and environmental bene-
                                                                                                     or other challenges, and the divestment of             fits, efficiencies, and impacts (including the
                                            terms in section 1184(a) of the Water Re-
                                                                                                     which to a non-Federal entity could better             effects on living coral) of using the dredged
                                            sources Development Act of 2016 (33 U.S.C.
                                                                                                     meet the local and regional needs for oper-            material for beneficial uses, including, in the
                                            2289a(a)).
                                                                                                     ation and maintenance.                                 case of beneficial reuse activities that in-
                                              (b) STUDY.—Not later than 2 years after the              ‘‘(c) CRITERIA.—In conducting the assess-
                                            date of enactment of this Act, the Comp-                                                                        volve more than one water resources devel-
                                                                                                     ment under subsection (a) and developing the
                                            troller General of the United States shall                                                                      opment project, the benefits, efficiencies,
                                                                                                     inventory under subsection (b), the Sec-
                                            conduct, and submit to the Committee on                                                                         and impacts that result from the combined
                                                                                                     retary shall use the following criteria:
                                            Transportation and Infrastructure of the                                                                        activities.
                                                                                                       ‘‘(1) The extent to which the project aligns
                                            House of Representatives and the Committee                                                                        (B) CALCULATION OF FEDERAL STANDARD.—
                                                                                                     with the current missions of the Corps of En-
                                            on Environment and Public Works of the                                                                          The economic benefits and efficiencies from
                                                                                                     gineers.
                                            Senate, a report on the results of a study on                                                                   the beneficial use of dredged material con-
                                                                                                       ‘‘(2) The economic and environmental im-             sidered by the Secretary under subparagraph
                                            the consideration by the Secretary of nat-               pacts of the project on existing communities
                                            ural infrastructure, natural features, and na-                                                                  (A) shall be included in any determination
                                                                                                     in the vicinity of the project.                        relating to the ‘‘Federal standard’’ by the
                                            ture-based features in the study of the feasi-             ‘‘(3) The extent to which the divestment or
                                            bility of projects for flood risk management,                                                                   Secretary under section 335.7 of title 33, Code
                                                                                                     modification of the project could reduce op-           of Federal Regulations for the placement or
                                            hurricane and storm damage risk reduction,               eration and maintenance costs of the Corps
                                            and ecosystem restoration.                                                                                      disposal of such material.
                                                                                                     of Engineers.                                            (b) BENEFICIAL USE OF DREDGED MATE-
                                              (c) REQUIREMENTS.—The study under sub-                   ‘‘(4) The extent to which the divestment or          RIAL.—
                                            section (b) shall include—                               modification of the project is in the public             (1) PILOT PROGRAM PROJECTS.—Section 1122
                                              (1) a description of guidance or instruc-              interest.                                              of the Water Resources Development Act of
                                            tions issued, and other measures taken, by                 ‘‘(5) The extent to which investment of ad-          2016 (33 U.S.C. 2326 note) is amended—
                                            the Secretary to consider natural infrastruc-            ditional Federal resources in the project pro-           (A) in subsection (b)(1), by striking ‘‘20’’
                                            ture, natural features, and nature-based fea-            posed for divestment or modification, includ-          and inserting ‘‘30’’; and
                                            tures in project feasibility studies;                    ing investment needed to bring the project               (B) in subsection (g), by striking ‘‘20’’ and
                                              (2) an assessment, based on information                to a good state of repair, is in the public in-        inserting ‘‘30’’.
                                            from relevant Federal and non-Federal                    terest.                                                  (2) SENSE OF CONGRESS.—It is the sense of
                                            sources, of—                                               ‘‘(6) The extent to which the authorized             Congress that the Secretary, in selecting
                                              (A) the costs, benefits, and effects associ-           purpose of the project is no longer being met.         projects for the beneficial reuse of dredged
                                            ated with natural infrastructure, natural                  ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL                 materials under section 1122 of the Water Re-
                                            features, and nature-based features rec-                 INTERESTS.—A non-Federal interest for a                sources Development Act of 2016 (33 U.S.C.
                                            ommended by the Secretary for flood risk                 project may recommend that the Secretary               2326 note), should ensure the thorough eval-
                                            management, hurricane and storm damage                   include such project in the assessment or in-          uation of project submissions from rural,
                                            risk reduction, and ecosystem restoration;               ventory required under this section.                   small, and economically disadvantaged com-
                                            and                                                        ‘‘(e) REPORT TO CONGRESS.—                           munities.
                                              (B) the effectiveness of natural infrastruc-             ‘‘(1) IN GENERAL.—Upon completion of the               (c) FIVE-YEAR REGIONAL DREDGED MATE-
                                            ture, natural features, and nature-based fea-            inventory required by subsection (b), the              RIAL MANAGEMENT PLANS.—
                                            tures;                                                   Secretary shall submit to the Committee on               (1) IN GENERAL.—Not later than 1 year after
                                              (3) an analysis of projects for flood risk             Environment and Public Works of the Senate             the date of enactment of this Act, and annu-
                                            management, hurricane and storm damage                   and the Committee on Transportation and                ally thereafter, the District Commander of
                                            risk reduction, and ecosystem restoration                Infrastructure of the House of Representa-             each district of the Corps of Engineers that
                                            that have incorporated natural infrastruc-               tives, and make publicly available, a report           obtains dredged material through the con-
                                            ture, natural features, or nature-based fea-             containing the findings of the Secretary with          struction or operation and maintenance of a
                                            tures to identify best practices, including for          respect to the assessment and inventory re-            water resources development project shall,
                                            measuring project benefits and costs;                    quired under this section.                             at Federal expense, develop and submit to
                                              (4) a description of any statutory, fiscal,              ‘‘(2) INCLUSION.—The Secretary shall list in         the Secretary a 5-year dredged material
                                            regulatory, or other policy barriers to the              an appendix any recommendation of a non-               management plan in coordination with rel-
                                            appropriate consideration and use of a full              Federal interest made with respect to a                evant State agencies and stakeholders.




dlhill on DSK120RN23PROD with HOUSE
                                            array of natural infrastructure, natural fea-            project under subsection (d) that the Sec-               (2) SCOPE.—Each plan developed under this
                                            tures, and nature-based features in carrying             retary determines not to include in the in-            subsection shall include—
                                            out feasibility studies and projects; and                ventory developed under subsection (b),                  (A) a dredged material budget for each wa-
                                              (5) any recommendations for changes to                 based on the criteria in subsection (c), in-           tershed or littoral system within the dis-
                                            law, or to fiscal, regulatory, or other poli-            cluding information about the request and              trict;
                                            cies, to improve the use of natural infra-               the reasons for the Secretary’s determina-               (B) an estimate of the amount of dredged
                                            structure, natural features, and nature-based            tion.’’.                                               material likely to be obtained through the




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00050   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                      H3933
                                            construction or operation and maintenance                  ‘‘(iii) restoring or reconnecting floodplains        ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.
                                            of all water resources development projects              and wetlands that are important for anad-                ‘‘Not later than 180 days after the date of
                                            projected to be carried out within the dis-              romous fish habitat or passage.                        enactment of the Water Resources Develop-
                                            trict during the 5-year period following sub-              ‘‘(B) BENEFITS.—A project that includes              ment Act of 2020, the Secretary shall submit
                                            mission of the plan, and the estimated tim-              measures under this paragraph shall be for-            to Congress and make publicly available a
                                            ing for obtaining such dredged material;                 mulated to maximize benefits for the anad-             report that describes—
                                              (C) an identification of potential water re-           romous fish species benefitted by the                    ‘‘(1) the extent to which, during the 10 fis-
                                            sources development projects projected to be             project.’’; and                                        cal years prior to such date of enactment,
                                            carried out within the district during such 5-             (2) by adding at the end the following:              the Secretary has carried out section 3 of the
                                            year period that are suitable for, or that re-             ‘‘(g) PRIORITIZATION.—The Secretary shall            Act of March 2, 1945 (33 U.S.C. 603a);
                                            quire, the placement of dredged material,                give projects that include measures de-                  ‘‘(2) how the Secretary has evaluated po-
                                            and an estimate of the amount of dredged                 scribed in subsection (a)(3) equal priority for        tential work to be carried out under that
                                            material placement capacity of such                      implementation as other projects under this            section; and
                                            projects;                                                section.’’.                                              ‘‘(3) the extent to which the Secretary
                                              (D) an evaluation of—                                  SEC. 127. ANNUAL REPORT TO CONGRESS.                   plans to start, continue, or complete debris
                                              (i) the suitability of the dredged material               Section 7001(c)(4)(B) of the Water Re-              removal activities in the 3 years following
                                            for a full range of beneficial uses; and                 sources Reform and Development Act of 2014             submission of the report.’’.
                                              (ii) the economic and environmental bene-              (33 U.S.C. 2282d(c)(4)(B)) is amended—                 SEC.    131.
                                                                                                                                                                      MISSOURI RIVER INTERCEPTION-
                                            fits, efficiencies, and impacts (including the              (1) in clause (i), by striking ‘‘and’’ at the                 REARING COMPLEX CONSTRUCTION.
                                            effects on living coral) of using the dredged            end;                                                     (a) REPORT.—Not later than 1 year after
                                            material for beneficial uses, including, in the             (2) by redesignating clause (ii) as clause          the date of enactment of this Act, and annu-
                                            case of beneficial reuse activities that in-             (iii); and                                             ally thereafter, the Secretary shall submit
                                            volve more than one water resources devel-                  (3) by inserting after clause (i) the fol-          to the Committee on Transportation and In-
                                            opment project, the benefits, efficiencies,              lowing:                                                frastructure of the House of Representatives
                                            and impacts that result from the combined                   ‘‘(ii) the Secretary shall not include pro-         and the Committee on Environment and
                                            activities; and                                          posals in the appendix of the annual report            Public Works of the Senate a report on the
                                              (E) the district-wide goals for beneficial             that otherwise meet the criteria for inclu-            effects of any interception-rearing complex
                                            reuse of the dredged material, including any             sion in the annual report solely on the basis          constructed on the Missouri River on—
                                            expected cost savings from aligning and co-              that the proposals are for the purposes of               (1) flood risk management and navigation;
                                            ordinating multiple projects (including                  navigation, flood risk management, eco-                and
                                            projects across Corps districts) in the reuse            system restoration, or municipal or agricul-             (2) the population recovery of the pallid
                                            of the dredged material.                                 tural water supply; and’’.                             sturgeon, including baseline population
                                              (3) PUBLIC COMMENT.—In developing each                                                                        counts.
                                                                                                     SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRA-
                                            plan under this subsection, each District                                                                         (b) NO ADDITIONAL IRC CONSTRUCTION.—
                                                                                                                 TION PROGRAM.
                                                                                                                                                            The Secretary may not authorize construc-
                                            Commander shall provide notice and an op-                  (a) IN GENERAL.—The Secretary shall carry            tion of an interception-rearing complex on
                                            portunity for public comment.                            out a demonstration program to determine               the Missouri River until the Secretary—
                                              (4) PUBLIC AVAILABILITY.—Upon submission               the causes of, and implement measures to ef-             (1) submits the report required by sub-
                                            of each plan to the Secretary under this sub-            fectively detect, prevent, treat, and elimi-           section (a);
                                            section, each District Commander shall                   nate, harmful algal blooms associated with               (2) acting through the Engineer Research
                                            make the plan publicly available, including              water resources development projects.                  and Development Center, conducts further
                                            on a publicly available website.                           (b) CONSULTATION; USE OF EXISTING DATA
                                                                                                                                                            research on interception-rearing complex de-
                                              (d) DREDGE PILOT PROGRAM.—                             AND PROGRAM AUTHORITIES.—In carrying out
                                                                                                                                                            sign, including any effects on existing flows,
                                              (1) REVISIONS.—Section 1111 of the Water               the demonstration program under subsection
                                                                                                                                                            flood risk management, and navigation; and
                                            Resources Development Act of 2018 (33 U.S.C.             (a), the Secretary shall—
                                                                                                                                                              (3) develops a plan—
                                            2326 note) is amended—                                     (1) consult with the heads of appropriate
                                                                                                                                                              (A) to repair dikes and revetments that are
                                              (A) in subsection (a), by striking ‘‘for the           Federal and State agencies; and
                                                                                                                                                            affecting flood risk and bank erosion; and
                                            operation and maintenance of harbors and                   (2) make maximum use of existing Federal
                                                                                                                                                              (B) to establish, repair, or improve water
                                            inland harbors’’ and all that follows through            and State data and ongoing programs and ac-
                                                                                                                                                            control structures at the headworks of con-
                                            the period at the end and inserting the fol-             tivities of Federal and State agencies, in-
                                                                                                                                                            structed shallow water habitat side-chan-
                                            lowing: ‘‘for the operation and maintenance              cluding the activities of the Secretary car-
                                                                                                                                                            nels.
                                            of—                                                      ried out through the Engineer Research and               (c) FUTURE IRC CONSTRUCTION.—
                                              ‘‘(1) harbors and inland harbors referred to           Development Center pursuant to section 1109              (1) PUBLIC COMMENT.—The Secretary shall
                                            in section 210(a)(2) of the Water Resources              of the Water Resources Development Act of              provide an opportunity for comment from
                                            Development Act of 1986 (33 U.S.C. 2238(a)(2));          2018 (33 U.S.C. 610 note).                             the public and the Governor of each affected
                                            or                                                         (c) FOCUS AREAS.—In carrying out the dem-            State on any proposals to construct an inter-
                                              ‘‘(2) inland and intracoastal waterways of             onstration program under subsection (a), the           ception-rearing complex after the date of en-
                                            the United States described in section 206 of            Secretary shall undertake program activi-              actment of this Act.
                                            the Inland Waterways Revenue Act of 1978                 ties related to harmful algal blooms in the              (2) PERIOD.—The public comment period re-
                                            (33 U.S.C. 1804).’’; and                                 Great Lakes, the tidal and inland waters of            quired by paragraph (1) shall be not less than
                                              (B) in subsection (b), by striking ‘‘or inland         the State of New Jersey, the coastal and               90 days for each proposal to construct an
                                            harbors’’ and inserting ‘‘, inland harbors, or           tidal waters of the State of Louisiana, the            interception-rearing complex on the Mis-
                                            inland or intracoastal waterways’’.                      waterways of the counties that comprise the            souri River.
                                              (2) COORDINATION WITH EXISTING AUTHORI-                Sacramento-San Joaquin Delta, California,              SEC. 132. COST AND BENEFIT FEASIBILITY AS-
                                            TIES.—The Secretary may carry out the                    and Lake Okeechobee, Florida.                                     SESSMENT.
                                            dredge pilot program authorized by section               SEC. 129. UPDATE ON INVASIVE SPECIES POLICY              (a) IN GENERAL.—Section 5(a)(2)(B) of the
                                            1111 of the Water Resources Development                              GUIDANCE.                                  Act of August 18, 1941 (33 U.S.C. 701n(a)(2)(B))
                                            Act of 2018 (33 U.S.C. 2326 note) in coordina-             (a) IN GENERAL.—The Secretary shall peri-            is amended—
                                            tion with Federal regional dredge dem-                   odically update the Invasive Species Policy               (1) in clause (i)(I), by inserting ‘‘, or pro-
                                            onstration programs in effect on the date of             Guidance, developed under section 104 of the           vide contributions equal to,’’ after ‘‘pay’’;
                                            enactment of this Act.                                   River and Harbor Act of 1958 (33 U.S.C. 610)           and
                                            SEC. 126. AQUATIC ECOSYSTEM RESTORATION                  and the Nonindigenous Aquatic Nuisance                    (2) in clause (ii)—
                                                       FOR ANADROMOUS FISH.                          Prevention and Control Act of 1990 (16 U.S.C.             (A) in the heading, by inserting ‘‘AND CON-
                                              (a) ANADROMOUS FISH HABITAT AND PAS-                   4701 et seq.), in accordance with the most re-         TRIBUTIONS’’ after ‘‘OF PAYMENTS’’;
                                            SAGE.—Section 206 of the Water Resources                 cent National Invasive Species Council Man-               (B) by inserting ‘‘or contributions’’ after
                                            Development Act of 1996 (33 U.S.C. 2330) is              agement Plan developed pursuant to Execu-              ‘‘Non-Federal payments’’; and
                                            amended—                                                 tive Order 13112.                                         (C) by inserting ‘‘or contributions’’ after
                                              (1) in subsection (a), by adding at the end              (b) INCLUSION.—The Secretary may include             ‘‘non-Federal payments’’.
                                            the following:                                           in the updated guidance invasive species spe-             (b) CONTINUED ELIGIBILITY.—Section 1161(b)
                                              ‘‘(3) ANADROMOUS FISH HABITAT AND PAS-                 cific efforts at federally authorized water re-        of the Water Resources Development Act of
                                            SAGE.—                                                   sources development projects located in—               2018 (33 U.S.C. 701n note) is amended—
                                                                                                       (1) high-altitude lakes; and




dlhill on DSK120RN23PROD with HOUSE
                                              ‘‘(A) MEASURES.—A project under this sec-                                                                        (1) in the matter preceding paragraph (1)—
                                            tion may include measures to improve habi-                 (2) the Tennessee and Cumberland River                  (A) by striking the ‘‘three fiscal years pre-
                                            tat or passage for anadromous fish, includ-              basins.                                                ceding’’ and inserting ‘‘five fiscal years pre-
                                            ing—                                                     SEC. 130. REPORT ON DEBRIS REMOVAL.                    ceding’’; and
                                              ‘‘(i) installing fish bypass structures on               Section 1210 of the Water Resources Devel-              (B) by striking ‘‘last day of the third fiscal
                                            small water diversions;                                  opment Act of 2018 (132 Stat. 3808) is amend-          year’’ and inserting ‘‘last day of the fifth fis-
                                              ‘‘(ii) modifying tide gates; and                       ed to read as follows:                                 cal year’’;




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00051   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016    H29JYPT1
                                            H3934                                              CONGRESSIONAL RECORD — HOUSE                                                             July 29, 2020
                                              (2) in paragraph (1), by inserting ‘‘, or pro-           ‘‘(2) CONSULTATION.—In identifying defi-             award a grant to an eligible subrecipient
                                            vide contributions equal to,’’ before ‘‘an               ciencies and describing remedies for a levee           under this section that exceeds, for any 1
                                            amount sufficient’’; and                                 under paragraph (1), the Secretary shall con-          dam,’’.
                                              (3) by striking paragraph (2) and inserting            sult with relevant non-Federal interests, in-             (4) REQUIREMENTS.—Section 8A(d) of the
                                            the following:                                           cluding by providing an opportunity for com-           National Dam Safety Program Act (33 U.S.C.
                                              ‘‘(2) the Secretary determines that the                ment by those non-Federal interests.’’.                467f–2(d)) is amended—
                                            damage to the structure was not as a result              SEC. 135. NATIONAL DAM SAFETY PROGRAM.                    (A) in paragraph (1), by inserting ‘‘to an el-
                                            of negligent operation or maintenance.’’.                  (a) DEFINITIONS.—Section 2 of the National           igible subrecipient’’ after ‘‘this section’’;
                                            SEC. 133. MATERIALS, SERVICES, AND FUNDS FOR             Dam Safety Program Act (33 U.S.C. 467) is                 (B) in paragraph (2)—
                                                        REPAIR, RESTORATION, OR REHA-                amended—                                                  (i) in the paragraph heading, by striking
                                                        BILITATION OF PROJECTS.                                                                             ‘‘NON-FEDERAL SPONSOR’’ and inserting ‘‘ELI-
                                                                                                        (1) in paragraph (4)—
                                              (a) IN GENERAL.—In any area covered by an                                                                     GIBLE SUBRECIPIENT’’;
                                                                                                        (A) in subparagraph (A)—
                                            emergency or major disaster declaration de-                                                                        (ii) in the matter preceding subparagraph
                                                                                                        (i) by striking clause (iii) and inserting the
                                            clared under the Robert T. Stafford Disaster                                                                    (A), by striking ‘‘the non-Federal sponsor
                                                                                                     following:
                                            Relief and Emergency Assistance Act (42                                                                         shall’’ and inserting ‘‘an eligible sub-
                                                                                                        ‘‘(iii) has an emergency action plan that—
                                            U.S.C. 5121 et seq.), the Secretary is author-                                                                  recipient shall, with respect to the dam to be
                                                                                                        ‘‘(I) is approved by the relevant State dam
                                            ized to accept and use materials, services,                                                                     rehabilitated by the eligible subrecipient’’;
                                                                                                     safety agency; or
                                            and funds, during the period the declaration                                                                       (iii) by amending subparagraph (A) to read
                                                                                                        ‘‘(II) is in conformance with State law and
                                            is in effect, from a non-Federal interest or                                                                    as follows:
                                                                                                     pending approval by the relevant State dam
                                            private entity to repair, restore, or rehabili-                                                                    ‘‘(A) demonstrate that the community in
                                            tate a federally authorized water resources              safety agency;’’; and
                                                                                                                                                            which the dam is located participates in, and
                                            development project, and to provide reim-                   (ii) by striking clause (iv) and inserting the
                                                                                                                                                            complies with, all applicable Federal flood
                                            bursement to such non-Federal interest or                following:
                                                                                                                                                            insurance      programs,      including     dem-
                                            private entity for such materials, services,                ‘‘(iv) fails to meet minimum dam safety
                                                                                                                                                            onstrating that such community is partici-
                                            and funds, in the Secretary’s sole discretion,           standards of the State in which the dam is
                                                                                                                                                            pating in the National Flood Insurance Pro-
                                            and subject to the availability of appropria-            located, as determined by the State; and               gram, and is not on probation, suspended, or
                                            tions, if the Secretary determines that reim-               ‘‘(v) poses an unacceptable risk to the pub-        withdrawn from such Program;’’;
                                            bursement is in the public interest.                     lic, as determined by the Administrator, in               (iv) in subparagraph (B), by striking
                                              (b) ADDITIONAL REQUIREMENT.—The Sec-                   consultation with the Board.’’; and                    ‘‘have’’ and inserting ‘‘beginning not later
                                            retary may only reimburse for the use of ma-                (B) in subparagraph (B)(i), by inserting            than 2 years after the date on which the Ad-
                                            terials or services accepted under this sec-             ‘‘under a hydropower project with an author-           ministrator publishes criteria for hazard
                                            tion if such materials or services meet the              ized installed capacity of greater than 1.5            mitigation plans under paragraph (3), dem-
                                            Secretary’s specifications and comply with               megawatts’’ after ‘‘dam’’; and                         onstrate that the Tribal or local government
                                            all applicable laws and regulations that                    (2) in paragraph (10)—                              with jurisdiction over the area in which the
                                            would apply if such materials and services                  (A) in the heading, by striking ‘‘NON-FED-          dam is located has’’; and
                                            were acquired by the Secretary, including                ERAL SPONSOR’’ and inserting ‘‘ELIGIBLE SUB-              (v) in subparagraph (C), by striking ‘‘50-
                                            sections 3141 through 3148 and 3701 through              RECIPIENT’’; and                                       year period’’ and inserting ‘‘expected life of
                                            3708 of title 40, United States Code, section               (B) by striking ‘‘The term ‘non-Federal             the dam’’; and
                                            8302 of title 41, United States Code, and the            sponsor’ ’’ and inserting ‘‘The term ‘eligible            (C) by adding at the end the following:
                                            National Environmental Policy Act of 1969.               subrecipient’ ’’.                                         ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—
                                              (c) AGREEMENTS.—                                          (b) REHABILITATION OF HIGH HAZARD POTEN-            Not later than 1 year after the date of enact-
                                              (1) IN GENERAL.—Prior to the acceptance of             TIAL DAMS.—                                            ment of this paragraph, the Administrator,
                                            materials, services, or funds under this sec-               (1) ESTABLISHMENT OF PROGRAM.—Section               in consultation with the Board, shall publish
                                            tion, the Secretary and the non-Federal in-              8A(a) of the National Dam Safety Program               criteria for hazard mitigation plans required
                                            terest or private entity shall enter into an             Act (33 U.S.C. 467f–2(a)) is amended by strik-         under paragraph (2)(B).’’.
                                            agreement that specifies—                                ing ‘‘to non-Federal sponsors’’ and inserting             (5) FLOODPLAIN MANAGEMENT PLANS.—Sec-
                                              (A) the non-Federal interest or private en-            ‘‘to States with dam safety programs’’.                tion 8A(e) of the National Dam Safety Pro-
                                            tity shall hold and save the United States                  (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of           gram Act (33 U.S.C. 467f–2(e)) is amended—
                                            free from any and all damages that arise                 the National Dam Safety Program Act (33                   (A) in paragraph (1)—
                                            from use of materials or services of the non-            U.S.C. 467f–2(b)) is amended, in the matter               (i) in the matter preceding subparagraph
                                            Federal interest or private entity, except for           preceding paragraph (1), by striking ‘‘for a           (A), by striking ‘‘the non-Federal sponsor’’
                                            damages due to the fault or negligence of the            project may be used for’’ and inserting ‘‘to a         and inserting ‘‘an eligible subrecipient’’; and
                                            United States or its contractors;                        State may be used by the State to award                   (ii) in subparagraph (B), by striking ‘‘1
                                              (B) the non-Federal interest or private en-            grants to eligible subrecipients for’’.                year’’ and inserting ‘‘2 years’’ each place it
                                            tity shall certify that the materials or serv-              (3) AWARD OF GRANTS.—Section 8A(c) of the           appears; and
                                            ices comply with all applicable laws and reg-            National Dam Safety Program Act (33 U.S.C.                (B) by striking paragraph (3) and inserting
                                            ulations under subsection (b); and                       467f–2(c)) is amended—                                 the following:
                                              (C) any other term or condition required                  (A) in paragraph (1)(A), by striking ‘‘non-            ‘‘(3) PLAN CRITERIA AND TECHNICAL SUP-
                                            by the Secretary.                                        Federal sponsor’’ and inserting ‘‘State’’; and         PORT.—The Administrator, in consultation
                                              (2) EXCEPTION.—If an agreement under                      (B) in paragraph (2)—                               with the Board, shall provide criteria, and
                                            paragraph (1) was not entered prior to mate-                (i) in subparagraph (A), by striking ‘‘an eli-      may provide technical support, for the devel-
                                            rials or services being contributed, a non-              gible high hazard potential dam to a non-              opment and implementation of floodplain
                                            Federal interest or private entity shall enter           Federal sponsor’’ and inserting ‘‘eligible high        management plans prepared under this sub-
                                            into an agreement with the Secretary that—               hazard potential dams to a State’’;                    section.’’.
                                              (A) specifies the value, as determined by                 (ii) in subparagraph (B)—                              (6) CONTRACTUAL REQUIREMENTS.—Section
                                            the Secretary, of those materials or services               (I) in the subparagraph heading, by strik-          8A(i)(1) of the National Dam Safety Program
                                            contributed and eligible for reimbursement;              ing      ‘‘PROJECT    GRANT’’    and    inserting      Act (33 U.S.C. 467f–2(i)(1)) is amended by
                                            and                                                      ‘‘GRANT’’;                                             striking ‘‘a non-Federal sponsor’’ and insert-
                                              (B) ensures that the materials or services                (II) by striking ‘‘project grant agreement          ing ‘‘an eligible subrecipient’’.
                                            comply with subsection (b) and paragraph                 with the non-Federal sponsor’’ and inserting           SEC. 136. REHABILITATION OF CORPS OF ENGI-
                                            (1).                                                     ‘‘grant agreement with the State’’; and                            NEERS CONSTRUCTED PUMP STA-
                                            SEC. 134. LEVEE SAFETY.                                     (III) by striking ‘‘project,’’ and inserting                    TIONS.
                                              Section 9004 of the Water Resources Devel-             ‘‘projects for which the grant is awarded,’’;            (a) DEFINITIONS.—In this section:
                                            opment Act of 2007 (33 U.S.C. 3303) is amend-               (iii) by amending subparagraph (C) to read            (1) ELIGIBLE PUMP STATION.—The term ‘‘eli-
                                            ed by adding at the end the following:                   as follows:                                            gible pump station’’ means a pump station—
                                              ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—                    ‘‘(C) GRANT ASSURANCE.—As part of a grant             (A) constructed, in whole or in part, by the
                                              ‘‘(1) IN GENERAL.—For each levee included              agreement under subparagraph (B), the Ad-              Corps of Engineers for flood risk manage-
                                            in an inventory established under subsection             ministrator shall require that each eligible           ment purposes;
                                            (b) or for which the Secretary has conducted             subrecipient to which the State awards a                 (B) that the Secretary has identified as
                                            a review under subsection (c), the Secretary             grant under this section provides an assur-            having a major deficiency; and
                                            shall—                                                   ance, with respect to the dam to be rehabili-            (C) the failure of which the Secretary has




dlhill on DSK120RN23PROD with HOUSE
                                              ‘‘(A) identify the specific engineering and            tated by the eligible subrecipient, that the           determined would impair the function of a
                                            maintenance deficiencies, if any; and                    dam owner will carry out a plan for mainte-            flood risk management project constructed
                                              ‘‘(B) describe the recommended remedies                nance of the dam during the expected life of           by the Corps of Engineers.
                                            to correct each deficiency identified under              the dam.’’; and                                          (2) REHABILITATION.—
                                            subparagraph (A), and, if requested by owner                (iv) in subparagraph (D), by striking ‘‘A             (A) IN GENERAL.—The term ‘‘rehabilita-
                                            of a non-Federal levee, the associated costs             grant provided under this section shall not            tion’’, with respect to an eligible pump sta-
                                            of those remedies.                                       exceed’’ and inserting ‘‘A State may not               tion, means to address a major deficiency of




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00052   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                     H3935
                                            the eligible pump station caused by long-                cordance with the project authorization or             completion or performance of the covered
                                            term degradation of the foundation, con-                 this subsection.                                       project.
                                            struction materials, or engineering systems                ‘‘(B) NEW PROJECT PARTNERSHIP AGREE-                   ‘‘(ii) CREDIT OF COSTS.—If the non-Federal
                                            or components of the eligible pump station.              MENTS.—The Secretary may not enter into a              interest incurs costs or in-kind contributions
                                               (B) INCLUSIONS.—The term ‘‘rehabilita-                project partnership agreement under this               for a project to remedy a design or construc-
                                            tion’’, with respect to an eligible pump sta-            subsection during the period beginning on              tion deficiency of a project or separable ele-
                                            tion, includes—                                          the date of enactment of this paragraph and            ment which has a 100 percent Federal cost
                                               (i) the incorporation into the eligible pump          ending on the date on which the Secretary              share, and the Secretary determines the
                                            station of—                                              issues the guidance under subparagraph                 remedy to be integral to the completion or
                                               (I) current design standards;                         (A).’’.                                                performance of the project, the Secretary is
                                               (II) efficiency improvements; and                     SEC. 138. DEFINITION OF ECONOMICALLY DIS-              authorized to credit such costs to any inter-
                                               (III) associated drainage; and                                   ADVANTAGED COMMUNITY.                       est accrued on a deferred non-Federal con-
                                               (ii) increasing the capacity of the eligible            (a) IN GENERAL.—Not later than 180 days              tribution.’’.
                                            pump station, subject to the condition that              after the date of enactment of this Act, the           SEC. 141. REVIEW OF CONTRACTING POLICIES.
                                            the increase shall—                                      Secretary shall issue guidance defining the              (a) IN GENERAL.—Not later than 180 days
                                               (I) significantly decrease the risk of loss of        term ‘‘economically disadvantaged commu-               after the date of enactment of this section,
                                            life and property damage; or                             nity’’ for the purposes of this Act and the            the Secretary shall complete a review of the
                                               (II) decrease total lifecycle rehabilitation          amendments made by this Act.                           policies, guidelines, and regulations of the
                                            costs for the eligible pump station.                        (b) CONSIDERATIONS.—In defining the term            Corps of Engineers for the development of
                                               (b) AUTHORIZATION.—The Secretary may                  ‘‘economically disadvantaged community’’               contractual agreements between the Sec-
                                            carry out rehabilitation of an eligible pump             under subsection (a), the Secretary shall, to          retary and non-Federal interests and utili-
                                            station, if the Secretary determines that the            the maximum extent practicable, utilize the            ties associated with the construction of
                                            rehabilitation is feasible.                              criteria under paragraphs (1) or (2) of section        water resources development projects.
                                               (c) COST SHARING.—The non-Federal inter-              301(a) of the Public Works and Economic De-              (b) REPORT.—Not later than 90 days after
                                            est for the eligible pump station shall—                 velopment Act of 1965 (42 U.S.C. 3161), to the         completing the review under subsection (a),
                                               (1) provide 35 percent of the cost of reha-           extent that such criteria are applicable in re-        the Secretary shall submit to the Committee
                                            bilitation of an eligible pump station carried           lation to the development of water resources           on Transportation and Infrastructure of the
                                            out under this section; and                              development projects.                                  House of Representatives and the Committee
                                               (2) provide all land, easements, rights-of-              (c) PUBLIC COMMENT.—In developing the               on Environment and Public Works of the
                                            way, and necessary relocations associated                                                                       Senate, and make publicly available, a re-
                                                                                                     guidance under subsection (a), the Secretary
                                            with the rehabilitation described in subpara-                                                                   port that includes—
                                                                                                     shall provide notice and an opportunity for
                                            graph (A), at no cost to the Federal Govern-                                                                      (1) a summary of the results of the review;
                                                                                                     public comment.
                                            ment.                                                                                                           and
                                                                                                     SEC. 139. COST SHARING PROVISIONS FOR TERRI-
                                               (d) AGREEMENT REQUIRED.—The rehabilita-                                                                        (2) public guidance on best practices for
                                                                                                                 TORIES AND INDIAN TRIBES.
                                            tion of an eligible pump station pursuant to                                                                    non-Federal interest to use when writing or
                                                                                                       Section 1156(b) of the Water Resources De-           developing contractual agreements with the
                                            this section shall be initiated only after a
                                                                                                     velopment Act of 1986 (33 U.S.C. 2310(b)) is           Secretary and utilities.
                                            non-Federal interest has entered into a bind-
                                                                                                     amended by striking ‘‘for inflation’’ and all            (c) PROVISION OF GUIDANCE.—The Secretary
                                            ing agreement with the Secretary—
                                                                                                     that follows through the period at the end             shall provide the best practices guidance in-
                                               (1) to pay the non-Federal share of the
                                                                                                     and inserting ‘‘on an annual basis for infla-          cluded under subsection (b)(2) to non-Federal
                                            costs of rehabilitation under subsection (c);
                                                                                                     tion.’’.                                               interests prior to the development of con-
                                            and
                                               (2) to pay 100 percent of the operation and           SEC. 140. FLOOD CONTROL AND OTHER PUR-                 tractual agreements.
                                                                                                                POSES.                                      SEC. 142. BUY AMERICA.
                                            maintenance costs of the rehabilitated eligi-
                                            ble pump station, in accordance with regula-               Section 103(k) of the Water Resources De-              With respect to all Corps of Engineers con-
                                            tions promulgated by the Secretary.                      velopment Act of 1986 (33 U.S.C. 2213) is              struction and rehabilitation contracts to be
                                               (e) TREATMENT.—The rehabilitation of an               amended—                                               awarded after the date of enactment of this
                                            eligible pump station pursuant to this sec-                (1) by striking ‘‘Except as’’ and inserting          Act, the steel components furnished and de-
                                            tion shall not be considered to be a separable           the following:                                         livered under such contracts shall be manu-
                                            element of the associated flood risk manage-               ‘‘(1) IN GENERAL.—Except as’’; and                   factured or fabricated in whole or substan-
                                            ment project constructed by the Corps of En-               (2) by adding at the end the following:              tial part in the United States with steel pro-
                                            gineers.                                                   ‘‘(2) RENEGOTIATION OF TERMS.—                       duced or made in the United States, its terri-
                                               (f) AUTHORIZATION OF APPROPRIATIONS.—                   ‘‘(A) IN GENERAL.—At the request of a non-           tories, or possessions.
                                            There is authorized to be appropriated to                Federal interest, the Secretary and the non-           SEC. 143. ANNUAL REPORT ON STATUS OF FEASI-
                                            carry out this section $60,000,000, to remain            Federal interest may renegotiate the terms                         BILITY STUDIES.
                                            available until expended.                                and conditions of an eligible deferred pay-              Concurrent with each report submitted
                                            SEC. 137. NON-FEDERAL PROJECT IMPLEMENTA-                ment, including—                                       under section 7001 of the Water Resources
                                                        TION PILOT PROGRAM.                            ‘‘(i) permitting the non-Federal contribu-           Reform and Development Act of 2014 (33
                                              Section 1043(b) of the Water Resources Re-             tion to be made without interest, pursuant             U.S.C. 2282d), the Secretary shall submit to
                                            form and Development Act of 2014 (33 U.S.C.              to paragraph (1);                                      the Committee on Transportation and Infra-
                                            2201 note) is amended—                                     ‘‘(ii) recalculation of the interest rate;           structure of the House of Representatives
                                              (1) in paragraph (7), by striking ‘‘the date             ‘‘(iii) full or partial forgiveness of interest      and the Committee on Environment and
                                            that is 5 years after the date of enactment of           accrued during the period of construction;             Public Works a report that provides for an
                                            this Act’’ and inserting ‘‘September 30, 2026’’;         and                                                    accounting of all outstanding feasibility
                                              (2) in paragraph (8), by striking ‘‘2023’’ and           ‘‘(iv) a credit against construction interest        studies being conducted by the Secretary, in-
                                            inserting ‘‘2026’’; and                                  for a non-Federal investment that benefits             cluding, for each such study, its length, cost,
                                              (3) by adding at the end the following:                the completion or performance of the project           and expected completion date.
                                              ‘‘(9) IMPLEMENTATION GUIDANCE.—                        or separable element.                                       TITLE II—STUDIES AND REPORTS
                                              ‘‘(A) IN GENERAL.—Not later than 120 days                ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An eli-             SEC. 201. AUTHORIZATION OF PROPOSED FEASI-
                                            after the date of enactment of this para-                gible deferred payment agreement under sub-                        BILITY STUDIES.
                                            graph, the Secretary shall issue guidance for            paragraph (A) is an agreement for which—                 (a) IN GENERAL.—The Secretary is author-
                                            the implementation of the pilot program                    ‘‘(i) the non-Federal contribution was               ized to conduct a feasibility study for the
                                            that, to the extent practicable, identifies—             made with interest;                                    following projects for water resources devel-
                                              ‘‘(i) the metrics for measuring the success              ‘‘(ii) the period of project construction ex-        opment and conservation and other purposes,
                                            of the pilot program;                                    ceeds 10 years from the execution of a                 as identified in the reports titled ‘‘Report to
                                              ‘‘(ii) a process for identifying future                project partnership agreement or appropria-            Congress on Future Water Resources Devel-
                                            projects to participate in the pilot program;            tion of funds; and                                     opment’’ submitted to Congress pursuant to
                                              ‘‘(iii) measures to address the risks of a               ‘‘(iii) the construction interest exceeds            section 7001 of the Water Resources Reform
                                            non-Federal interest constructing projects               $45,000,000.                                           and Development Act of 2014 (33 U.S.C. 2282d)
                                            under the pilot program, including which en-               ‘‘(C) CREDIT FOR NON-FEDERAL CONTRIBU-               or otherwise reviewed by Congress:
                                            tity bears the risk for projects that fail to            TION.—                                                   (1) TONTO CREEK, GILA RIVER, ARIZONA.—
                                            meet the Corps of Engineers standards for                  ‘‘(i) IN GENERAL.—The Secretary is author-           Project for flood risk management, Tonto




dlhill on DSK120RN23PROD with HOUSE
                                            design or quality;                                       ized to credit any costs incurred by the non-          Creek, Gila River, Arizona.
                                              ‘‘(iv) the laws and regulations that a non-            Federal interest (including in-kind contribu-            (2) SULPHUR RIVER, ARKANSAS AND TEXAS.—
                                            Federal interest must follow in carrying out             tions) to remedy a design or construction de-          Project for ecosystem restoration, Sulphur
                                            a project under the pilot program; and                   ficiency of a covered project or separable ele-        River, Arkansas and Texas.
                                              ‘‘(v) which entity bears the risk in the               ment toward the non-Federal share of the                 (3) CABLE CREEK, CALIFORNIA.—Project for
                                            event that a project carried out under the               cost of the covered project, if the Secretary          flood risk management, water supply, and
                                            pilot program fails to be carried out in ac-             determines the remedy to be integral to the            related benefits, Cable Creek, California.




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00053   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3936                                              CONGRESSIONAL RECORD — HOUSE                                                             July 29, 2020
                                              (4) DEL MAR BLUFFS, CALIFORNIA.—Project                tion, and ecosystem restoration, Wading                  (6) Project for flood damage reduction and
                                            for shoreline stabilization, Del Mar Bluffs,             River Creek, New York.                                 ecosystem restoration, Del Rosa Channel,
                                            San Diego County, California.                              (26) REEL POINT PRESERVE, NEW YORK.—                 city of San Bernardino, California.
                                              (5) REDBANK AND FANCHER CREEKS, CALI-                  Project for navigation and shoreline sta-                (7) Project for flood risk management,
                                            FORNIA.—Project for water conservation and               bilization, Reel Point Preserve, New York.             Lower Cache Creek, California.
                                            water supply, Redbank and Fancher Creeks,                  (27) GOLDSMITH INLET, NEW YORK.—Project                (8) Project for flood damage reduction and
                                            California.                                              for navigation, Goldsmith Inlet, New York.             ecosystem restoration, Mission-Zanja Chan-
                                              (6) RIO HONDO CHANNEL, CALIFORNIA.—                      (28) TUSCARAWAS RIVER BASIN, OHIO.—                  nel, cities of San Bernardino and Redlands,
                                            Project for ecosystem restoration, Rio                   Project for comprehensive watershed study,             California.
                                            Hondo Channel, San Gabriel River, Cali-                  Tuscarawas River Basin, Ohio.                            (9) Project for shoreline protection, Ocean-
                                            fornia.                                                    (29) LOWER COLUMBIA RIVER BASIN (TURNING             side, California, authorized pursuant to sec-
                                              (7) SOUTHERN CALIFORNIA, CALIFORNIA.—                  BASIN), OREGON AND WASHINGTON.—Project to              tion 414 of the Water Resources Development
                                            Project for coastal storm damage reduction,              improve and add turning basins for the                 Act of 2000 (114 Stat. 2636; 121 Stat. 1176).
                                            Southern California.                                     project for navigation, Columbia River Chan-             (10) Project for flood risk management,
                                              (8) SHINGLE CREEK AND KISSIMMEE RIVER,                 nel, Oregon and Washington, authorized by              Prado Basin, California.
                                            FLORIDA.—Project for ecosystem restoration               section 101(b)(13) of the Water Resources De-            (11) Project to modify the project for navi-
                                            and water storage, Shingle Creek and Kis-                velopment Act of 1999 (113 Stat. 280).                 gation, San Francisco Bay to Stockton, Cali-
                                            simmee River, Osceola County, Florida.                     (30)    WILLIAMSPORT,       PENNSYLVANIA.—
                                                                                                                                                            fornia.
                                              (9) ST. JOHN’S RIVER AND LAKE JESUP, FLOR-             Project for flood risk management and levee              (12) Project to modify the Seven Oaks
                                            IDA.—Project for ecosystem restoration, St.              rehabilitation, greater Williamsport, Penn-            Dam, California, portion of the project for
                                            John’s River and Lake Jesup, Florida.                    sylvania.                                              flood control, Santa Ana River Mainstem,
                                              (10) WAIMEA RIVER, HAWAII.—Project for                   (31) CITY OF CHARLESTON, SOUTH CARO-                 California, authorized by section 401(a) of the
                                            flood risk management, Waimea River,                     LINA.—Project for tidal- and inland-related
                                                                                                                                                            Water Resources Development Act of 1986
                                            Kauai, Hawaii.                                           flood risk management, Charleston, South               (100 Stat. 4113; 101 Stat. 1329–111; 104 Stat.
                                              (11) CHICAGO AREA WATERWAYS SYSTEM, IL-                Carolina.
                                            LINOIS.—Project for ecosystem restoration,
                                                                                                                                                            4611; 110 Stat. 3713; 121 Stat. 1115), to include
                                                                                                       (32) TENNESSEE AND CUMBERLAND RIVER BA-              water conservation as an authorized purpose.
                                            recreation, and other purposes, Illinois                 SINS, TENNESSEE.—Project to deter, impede,
                                            River, Chicago River, Calumet River, Grand                                                                        (13) Project to modify the project for navi-
                                                                                                     or restrict the dispersal of aquatic nuisance          gation, Delaware River Mainstem and Chan-
                                            Calumet River, Little Calumet River, and                 species in the Tennessee and Cumberland
                                            other waterways in the vicinity of Chicago,                                                                     nel Deepening, Delaware, New Jersey, and
                                                                                                     River Basins, Tennessee.                               Pennsylvania, authorized by section 101(6) of
                                            Illinois.                                                  (33) SABINE PASS TO GALVESTON BAY,
                                              (12) FOX RIVER, ILLINOIS.—Project for flood                                                                   the Water Resources Development Act of
                                                                                                     TEXAS.—Modification of the project for hur-
                                            risk management, Fox River, Illinois.                                                                           1992 (106 Stat. 4802; 113 Stat. 300; 114 Stat.
                                                                                                     ricane and storm damage risk reduction,                2602), to include the construction of a turn-
                                              (13) LOWER MISSOURI RIVER, KANSAS.—                    Port Arthur and Orange County, Texas, au-
                                            Project for bank stabilization and naviga-                                                                      ing basin located near the Packer Avenue
                                                                                                     thorized by section 203 of the Flood Control           Marine Terminal.
                                            tion, Lower Missouri River, Sioux City, Kan-             Act of 1962 (76 Stat. 1184), and authorized as
                                            sas.                                                                                                              (14) Project for ecosystem restoration, Cen-
                                                                                                     a separable element of the project for Sabine          tral and Southern Florida Project Canal 111
                                              (14) TANGIPAHOA PARISH, LOUISIANA.—                    Pass to Galveston Bay, authorized by item 3
                                            Project     for   flood  risk   management,                                                                     (C–111), South Dade County, Florida.
                                                                                                     of section 1401(3) of the Water Resources De-            (15) Project for comprehensive hurricane
                                            Tangipahoa Parish, Louisiana.                            velopment Act of 2018 (132 Stat. 3838), to re-
                                              (15) K  ENT   NARROWS AND   CHESTER  RIVER,                                                                   and storm damage risk reduction and shore-
                                                                                                     duce the risk of flooding through the con-             line erosion protection, Chicago, Illinois, au-
                                            MARYLAND.—Project for navigation, Kent                   struction of improvements to interior drain-
                                            Narrows and Chester River, Queen Anne’s                                                                         thorized by section 101(a)(12) of the Water
                                                                                                     age.                                                   Resources Development Act of 1996 (110 Stat.
                                            County, Maryland.                                          (34) PORT OF VICTORIA, TEXAS.—Project for
                                              (16) BOSTON, MASSACHUSETTS.—Project for                                                                       3664; 113 Stat. 302).
                                                                                                     flood risk management, Port of Victoria,                 (16) Project for flood risk management,
                                            hurricane and storm damage risk reduction,               Texas.
                                            Boston, Massachusetts, pursuant to the com-                                                                     Wheaton, DuPage County, Illinois.
                                                                                                       (35) LOWER FOX RIVER BASIN, WISCONSIN.—                (17) Project for flood damage reduction,
                                            prehensive study authorized under the Dis-               Project for comprehensive watershed study,
                                            aster Relief Appropriations Act, 2013 (Public                                                                   ecosystem restoration, and recreation, Blue
                                                                                                     Lower Fox River Basin, Wisconsin.                      River Basin, Kansas City, Kansas, carried
                                            Law 113–2).                                                (36) UPPER FOX RIVER AND WOLF RIVER, WIS-
                                              (17) LOWER ST. CROIX RIVER, MINNESOTA.—                                                                       out pursuant to the resolution of the Com-
                                                                                                     CONSIN.—Project for flood risk management
                                            Project for flood risk management, eco-                                                                         mittee on Transportation and Infrastructure
                                                                                                     and ecosystem restoration, Upper Fox River             of the House of Representatives adopted on
                                            system restoration, and recreation, Lower
                                                                                                     and Wolf River, Wisconsin.                             September 24, 2008 (docket number 2803).
                                            St. Croix River, Minnesota.                                (b) SPECIAL RULE.—The Secretary shall
                                              (18) ESCATAWPA RIVER BASIN, MISSISSIPPI.—                                                                       (18) Project for flood control, Amite River
                                                                                                     consider any study carried out by the Sec-
                                            Project for flood risk management and eco-               retary to formulate the modifications to the           and Tributaries east of the Mississippi River,
                                            system restoration, Escatawpa River, Jack-               project for hurricane and storm damage risk            Louisiana.
                                            son County, Mississippi.                                 reduction, Port Arthur and Orange County,                (19) Project for coastal storm risk manage-
                                              (19) LONG BEACH, BAY ST. LOUIS AND MIS-                Texas, identified in subsection (a)(33) to be a        ment, Upper Barataria Basin, Louisiana.
                                            SISSIPPI SOUND, MISSISSIPPI.—Project for hur-            continuation of the study carried out for                (20) Project to replace the Bourne and Sag-
                                            ricane and storm damage risk reduction and               Sabine Pass to Galveston Bay, Texas, au-               amore Bridges, Cape Cod, Massachusetts.
                                            flood risk management, Long Beach, Bay St.               thorized by a resolution of the Committee on             (21) Project to deepen the project for navi-
                                            Louis and Mississippi Sound, Mississippi.                Environment and Public Works of the Sen-               gation, Gulfport Harbor, Mississippi, author-
                                              (20) PASCAGOULA RIVER BASIN, MISSISSIPPI.—             ate, approved June 23, 2004, and funded by             ized by section 202(a) of the Water Resources
                                            Project for comprehensive watershed study,               title IV of division B of the Bipartisan Budg-         Development Act of 1986 (100 Stat. 4094).
                                            Pascagoula, Mississippi.                                 et Act of 2018, under the heading ‘‘Corps of             (22) Project for flood risk management,
                                              (21) TALLAHOMA AND TALLAHALA CREEKS,                   Engineers—Civil—Department of the Army—                Rahway River Basin, New Jersey.
                                            MISSISSIPPI.—Project for flood risk manage-              Construction’’ (Public Law 115–123; 132 Stat.            (23) Project for hurricane and storm dam-
                                            ment, Leaf River, Jones County, Mississippi.             76).                                                   age risk reduction, Raritan Bay and Sandy
                                              (22) LOWER OSAGE RIVER BASIN, MISSOURI.—               SEC. 202. EXPEDITED COMPLETIONS.                       Hook Bay, Highlands, New Jersey.
                                            Project for ecosystem restoration, Lower                   (a) FEASIBILITY REPORTS.—The Secretary                 (24) Project for navigation, Shark River,
                                            Osage River Basin, Missouri.                             shall expedite the completion of a feasibility         New Jersey.
                                              (23) UPPER BASIN AND STONY BROOK (GREEN                study for each of the following projects, and            (25) Project for flood risk management,
                                            BROOK SUB-BASIN), RARITAN RIVER BASIN, NEW               if the Secretary determines that the project           Rondout Creek-Wallkill River Watershed,
                                            JERSEY.—Reevaluation of the Upper Basin                  is justified in a completed report, may pro-           New York, carried out pursuant to the reso-
                                            and Stony Brook portions of the project for              ceed directly to preconstruction planning,             lution of the Committee on Transportation
                                            flood control, Green Brook Sub-basin, Rari-              engineering, and design of the project:                and Infrastructure of the House of Rep-
                                            tan River Basin, New Jersey, authorized by                 (1) Project for navigation, St. George Har-          resentatives adopted on May 2, 2007 (docket
                                            section 401 of the Water Resources Develop-              bor, Alaska.                                           number 2776).
                                            ment Act of 1986 (100 Stat. 4119), including               (2) Project for shoreline stabilization,               (26) Project for ecosystem restoration and
                                            the evaluation of nonstructural measures to              Aunu‘u Harbor, American Samoa.                         hurricane and storm damage risk reduction,




dlhill on DSK120RN23PROD with HOUSE
                                            achieve the project purpose.                               (3) Project for shoreline stabilization,             Spring Creek South (Howard Beach), Queens,
                                              (24) LAKE ONTARIO SHORELINE, NEW YORK.—                Tutuila Island, American Samoa.                        New York.
                                            Project for coastal storm resiliency, Lake                 (4) Project for flood risk management,                 (27) Project to resolve increased silting and
                                            Ontario shoreline, New York.                             Lower Santa Cruz River, Arizona.                       shoaling adjacent to the Federal channel,
                                              (25) WADING RIVER CREEK, NEW YORK.—                      (5) Project for flood control, water con-            Port of Bandon, Coquille River, Oregon.
                                            Project for hurricane and storm damage risk              servation, and related purposes, Coyote Val-             (28) Project for flood control, 42nd Street
                                            reduction, flood risk management, naviga-                ley Dam, California.                                   Levee, Springfield, Oregon, being carried out




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00054   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                     H3937
                                            under section 205 of the Flood Control Act of            SEC. 203. FEASIBILITY STUDY MODIFICATIONS.               (A) assure the preservation of cultural and
                                            1948 (33 U.S.C. 701s).                                     (a) SAN FRANCISCO BAY, CALIFORNIA.—Sec-              historic values associated with national his-
                                              (29) Project for ecosystem restoration,                tion 142 of the Water Resources Development            toric landmarks within the study area; and
                                            Hood River at the confluence with the Co-                Act of 1976 (90 Stat. 2930) is amended—                  (B) provide flood risk management for eco-
                                            lumbia River, Oregon.                                      (1) by inserting ‘‘, and along the ocean             nomically disadvantaged communities with-
                                              (30) Project for flood risk management, Rio            shoreline of San Mateo, San Francisco, and             in the study area.
                                            Culebrinas, Puerto Rico.                                 Marin Counties,’’ after ‘‘Sacramento and San           SEC. 205. COMPREHENSIVE STUDY OF THE SAC-
                                              (31) Project for flood risk management, Rio            Joaquin Rivers’’;                                                  RAMENTO RIVER, YOLO BYPASS,
                                            Grande de Manati, Puerto Rico.                             (2) by inserting ‘‘and, with respect to the                      CALIFORNIA.
                                              (32) Project for flood risk management, Rio            bay and ocean shorelines of San Mateo, San               (a) COMPREHENSIVE STUDY.—The Secretary
                                            Guayanilla, Puerto Rico.                                 Francisco, and Marin Counties, the feasi-              shall conduct a comprehensive study of the
                                              (33) Project for flood risk management,                bility of and the Federal interest in pro-             Sacramento River in the vicinity of the Yolo
                                            Dorchester County, South Carolina.                       viding measures to adapt to rising sea lev-            Bypass System, California, to identify ac-
                                              (34) Project for navigation, Georgetown                els’’ after ‘‘tidal and fluvial flooding’’;            tions to be undertaken by the Secretary for
                                            Harbor, South Carolina.                                    (3) by striking ‘‘investigation’’ and insert-        the comprehensive management of the Yolo
                                              (35) Project for hurricane and storm dam-              ing in its place ‘‘investigations’’; and               Bypass System for the purposes of flood risk
                                            age risk reduction, Myrtle Beach, South                    (4) by inserting after ‘‘San Francisco Bay           management, ecosystem restoration, water
                                            Carolina.                                                region’’ the following: ‘‘and, with respect to         supply, hydropower, and recreation.
                                              (36) Project to modify the projects for navi-          the bay and ocean shorelines and streams                 (b) CONSULTATION AND USE OF EXISTING
                                            gation and other purposes, Old Hickory Lock              running to the bay and ocean shorelines of             DATA.—
                                            and Dam and the Cordell Hull Dam and Res-                San Mateo, San Francisco, and Marin Coun-                (1) CONSULTATION.—In conducting the com-
                                            ervoir, Cumberland River, Tennessee, au-                 ties, the effects of proposed measures or im-          prehensive study under subsection (a), the
                                            thorized by the Act of July 24, 1946 (chapter            provements on the local economy; habitat               Secretary shall consult with the Governor of
                                            595, 60 Stat. 636), to add flood risk manage-            restoration, enhancement, or expansion ef-             the State of California, applicable Federal,
                                            ment as an authorized purpose.                           forts or opportunities; public infrastructure          State, and local agencies, non-Federal inter-
                                              (37) Project for flood risk management,                protection and improvement; stormwater                 ests, the Yolo Bypass and Cache Slough
                                            ecosystem restoration, water supply, and re-             runoff capacity and control measures, in-              Partnership, and other stakeholders.
                                            lated purposes, Lower Rio Grande River,                  cluding those that may mitigate flooding;                (2) USE OF EXISTING DATA AND PRIOR STUD-
                                                                                                     erosion of beaches and coasts; and any other           IES.—To the maximum extent practicable
                                            Cameron County, Texas, carried out pursu-
                                            ant to the resolution of the Committee on                measures or improvements relevant to                   and where appropriate, the Secretary may—
                                            Transportation and Infrastructure of the                 adapting to rising sea levels’’.                         (A) make use of existing data provided to
                                            House of Representatives adopted on May 21,                (b) SACRAMENTO RIVER, SOUTHERN SUTTER                the Secretary by the entities identified in
                                            2003 (docket number 2710).                               COUNTY, CALIFORNIA.—The study for flood                paragraph (1); and
                                              (38) Project for hurricane and storm dam-              control and allied purposes for the Sac-                 (B) incorporate—
                                            age risk reduction and shoreline erosion pro-            ramento River Basin, authorized by section               (i) relevant information from prior studies
                                            tection, Bolongo Bay, St. Thomas, United                 209 of the Flood Control Act of 1962 (76 Stat.         and projects carried out by the Secretary
                                            States Virgin Islands.                                   1197), is modified to authorize the Secretary          within the study area; and
                                              (39) Project for flood risk management,                to conduct a study for flood risk manage-                (ii) the latest technical data and scientific
                                            Savan Gut Phase II, St. Thomas, United                   ment, southern Sutter County between the               approaches to changing hydrologic and cli-
                                            States Virgin Islands.                                   Sacramento River and Sutter Bypass, Cali-              matic conditions.
                                                                                                     fornia.                                                  (c) RECOMMENDATIONS.—
                                              (40) Project for flood risk management,
                                                                                                       (c) SALTON SEA, CALIFORNIA.—In carrying                (1) IN GENERAL.—In conducting the com-
                                            Turpentine Run, St. Thomas, United States
                                                                                                     out the program to implement projects to re-           prehensive study under subsection (a), the
                                            Virgin Islands.
                                                                                                     store the Salton Sea, California, authorized           Secretary may develop a recommendation to
                                              (41) Project for navigation, North Landing
                                                                                                     by section 3032 of the Water Resources Devel-          Congress for—
                                            Bridge, Atlantic Intracoastal Waterway, Vir-
                                                                                                     opment Act of 2007 (121 Stat. 1113; 130 Stat.            (A) the construction of a water resources
                                            ginia.
                                                                                                     1677), the Secretary is authorized to carry            development project;
                                              (b)  POST-AUTHORIZATION        CHANGE   RE-            out a study for the construction of a perim-             (B) the structural or operational modifica-
                                            PORTS.—The Secretary shall      expedite com-            eter lake, or a northern or southern subset            tion of an existing water resources develop-
                                            pletion of a post-authorization change report            thereof, for the Salton Sea, California.               ment project;
                                            for the following projects:                                (d) NEW YORK AND NEW JERSEY HARBOR AND                 (C) additional monitoring of, or adaptive
                                              (1) Project for ecosystem restoration, Tres            TRIBUTARIES, NEW YORK AND NEW JERSEY.—                 management measures to carry out with re-
                                            Rios, Arizona.                                           The study for flood and storm damage reduc-            spect to, existing water resources develop-
                                              (2) Project for flood control, San Luis Rey            tion for the New York and New Jersey Har-              ment projects, to respond to changing hydro-
                                            River, California.                                       bor and Tributaries project, authorized by             logic and climatic conditions; or
                                              (3) Project for ecosystem restoration, Cen-            the Act of June 15, 1955 (chapter 140, 69 Stat.          (D) geographic areas within the Yolo By-
                                            tral and Southern Florida Project Canal 111              132), and being carried out pursuant to the            pass System for additional study by the Sec-
                                            (C–111), South Dade County, Florida.                     Disaster Relief Appropriations Act, 2013               retary.
                                              (4) Project for ecosystem restoration, Com-            (Public Law 113–2), is modified to require the           (2) ADDITIONAL CONSIDERATIONS.—Any fea-
                                            prehensive Everglades Restoration Plan,                  Secretary to—                                          sibility study carried out pursuant to a rec-
                                            Caloosahatchee River C–43, West Basin Stor-                (1) evaluate and address the impacts of              ommendation under paragraph (1)(D) shall be
                                            age Reservoir, Florida.                                  low-frequency precipitation and sea-level              considered to be a continuation of the com-
                                              (5) Project for flood risk management, Des             rise on the study area;                                prehensive study authorized under sub-
                                            Moines Levee System, including Birdland                    (2) consult with affected communities; and           section (a).
                                            Park Levee, Des Moines and Raccoon Rivers,                 (3) ensure the study is carried out in ac-             (d) COMPLETION OF STUDY; REPORT TO CON-
                                            Des Moines, Iowa.                                        cordance with section 1001 of the Water Re-            GRESS.—Not later than 3 years after the date
                                                                                                     sources Reform and Development Act of 2014             of enactment of this section, the Secretary
                                             (c) WATERSHED AND RIVER BASIN ASSESS-                   (33 U.S.C. 2282c).                                     shall submit to the Committee on Transpor-
                                            MENTS.—The Secretary shall expedite the
                                                                                                     SEC. 204. SELMA, ALABAMA.                              tation and Infrastructure of the House of
                                            completion of an assessment under section
                                                                                                       Not later than 180 days after the date of            Representatives and the Committee on Envi-
                                            729 of the Water Resources Development Act               enactment of this Act, the Secretary shall             ronment and Public Works of the Senate a
                                            of 1986 (33 U.S.C. 2267a), for the following:            submit to the Committee on Transportation              report detailing—
                                              (1) Kansas River Basin, Kansas.                        and Infrastructure of the House of Rep-                  (1) the results of the comprehensive study
                                              (2) Merrimack River Basin, Massachusetts.              resentatives and the Committee on Environ-             conducted under subsection (a), including
                                              (d) DISPOSITION STUDIES.—The Secretary                 ment and Public Works of the Senate a re-              any recommendations developed under sub-
                                            shall expedite the completion of a disposi-              port that—                                             section (c);
                                            tion study, carried out under section 216 of               (1) provides an update on the study for                (2) any additional, site-specific areas with-
                                            the Flood Control Act of 1970 (33 U.S.C. 549a),          flood risk management and riverbank sta-               in the Yolo Bypass System where additional
                                            for the following:                                       bilization, Selma, Alabama, authorized by              study for flood risk management or eco-
                                              (1) The disposition of the project for Sali-           resolutions of the Committees on Public                system restoration projects is recommended
                                            nas Reservoir (Santa Margarita Lake), Cali-              Works and Rivers and Harbors of the House              by the Secretary; and




dlhill on DSK120RN23PROD with HOUSE
                                            fornia.                                                  of Representatives on June 7, 1961, and April            (3) any interim actions relating to existing
                                              (2) The partial disposition of the Upper St.           28, 1936, respectively, the completion of              water resources development projects under-
                                            Anthony Falls Lock facility and surrounding              which the Secretary was required to expedite           taken by the Secretary during the study pe-
                                            real property, in accordance with the re-                by section 1203 of the Water Resources Devel-          riod.
                                            quirements of section 2010 of the Water Re-              opment Act of 2018 (132 Stat. 3803); and                 (e) DEFINITIONS.—In this section:
                                            sources Reform and Development Act of 2014                 (2) identifies project alternatives necessary          (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo
                                            (128 Stat. 1270; 132 Stat. 3812).                        to—                                                    Bypass System’’ means the system of weirs,




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00055   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3938                                              CONGRESSIONAL RECORD — HOUSE                                                             July 29, 2020
                                            levees, bypass structures, and other water               and critical natural or cultural resources;            to identify actions to be undertaken by the
                                            resources development projects in Califor-               and                                                    Secretary for the comprehensive manage-
                                            nia’s Sacramento River Valley, extending                   (3) to the maximum extent practicable and            ment of the basin for the purposes of flood
                                            from the Fremont Weir near Woodland, Cali-               where appropriate, utilize existing data pro-          risk management, navigation, ecosystem
                                            fornia, to the Sacramento River near Rio                 vided to the Secretary by Federal and State            restoration, water supply, hydropower, and
                                            Vista, California, authorized pursuant to sec-           agencies, Indian Tribes, and other stake-              recreation.
                                            tion 2 of the Act of March 1, 1917 (chapter              holders, including data obtained through                 (2) FOCUS AREAS.—In conducting the com-
                                            144; 39 Stat. 949).                                      other Federal programs.                                prehensive study under paragraph (1), the
                                              (2) YOLO BYPASS AND CACHE CLOUGH PART-                   (b)      RECOMMENDATIONS;        ADDITIONAL          Secretary shall investigate projects, includ-
                                            NERSHIP.—The term ‘‘Yolo Bypass and Cache                STUDY.—                                                ing—
                                            Slough Partnership’’ means the group of par-               (1) IN GENERAL   .—In carrying out the com-            (A) projects proposed in the comprehensive
                                            ties to the Yolo Bypass and Cache Slough                 prehensive assessment described in sub-                coastal protection master plan entitled
                                            Memorandum of Understanding, effective                   section (a), the Secretary may make a rec-             ‘‘Louisiana Comprehensive Master Plan for a
                                            May 2016, regarding collaboration and co-                ommendation to Congress for—                           Sustainable Coast’’ prepared by the State of
                                            operation in the Yolo Bypass and Cache                     (A) the construction of a water resources            Louisiana and accepted by the Louisiana
                                            Slough region.                                           development project;                                   Coastal Protection and Restoration Author-
                                            SEC.   206.   LAKE OKEECHOBEE           REGULATION         (B) the structural or operational modifica-          ity (including any subsequent amendments
                                                          SCHEDULE, FLORIDA.                         tion of an existing water resources develop-           or revisions), including—
                                              (a) IN GENERAL.—In carrying out the re-                ment project;                                            (i) Ama sediment diversion;
                                            view of the Lake Okeechobee regulation                     (C) such additional monitoring of, or                  (ii) Union freshwater diversion;
                                            schedule pursuant to section 1106 of the                 adaptive management measures to carry out                (iii)   increase   Atchafalaya    flow    to
                                            Water Resources Development Act of 2018                  with respect to, existing water resources de-          Terrebonne; and
                                            (132 Stat. 3773), the Secretary shall—                   velopment projects, to respond to changing               (iv) Manchac Landbridge diversion; and
                                              (1) evaluate the implications of prohibiting           hydrologic and climatic conditions; or                   (B) natural features and nature-based fea-
                                            releases from Lake Okeechobee through the                  (D) geographic areas within the Great                tures, including levee setbacks and instream
                                            S–308 and S–80 lock and dam structures on                Lakes System for additional study by the               and floodplain restoration.
                                            the operation of the lake in accordance with             Secretary.                                               (b) CONSULTATION AND USE OF EXISTING
                                            authorized purposes and seek to minimize                   (2) ADDITIONAL CONSIDERATIONS.—Any fea-              DATA.—In conducting the comprehensive
                                            unnecessary releases to coastal estuaries;               sibility study carried out pursuant to a rec-          study under subsection (a), the Secretary
                                            and                                                      ommendation under paragraph (1)(D) shall be            shall consult with applicable Federal, State,
                                              (2) to the maximum extent practicable, co-             considered to be a continuation of the com-            and local agencies, Indian Tribes, non-Fed-
                                            ordinate with the ongoing efforts of Federal             prehensive assessment described in sub-                eral interests, and other stakeholders, and,
                                            and State agencies responsible for moni-                 section (a).                                           to the maximum extent practicable and
                                            toring, forecasting, and notification of                   (c) EXEMPTION FROM MAXIMUM STUDY COST                where appropriate, make use of existing data
                                            cyanobacteria levels in Lake Okeechobee.                 AND DURATION LIMITATIONS.—Section 1001 of              provided to the Secretary by such parties.
                                              (b) MONTHLY REPORT.—Each month, the                    the Water Resources Reform and Develop-                  (c) RECOMMENDATIONS.—
                                            Secretary shall make public a report, which              ment Act of 2014 (33 U.S.C. 2282c) shall not             (1) IN GENERAL.—In conducting the com-
                                            may be based on the Water Management                     apply to any study recommended under sub-              prehensive study under subsection (a), the
                                            Daily Operational Reports, disclosing the                section (b)(1)(D).                                     Secretary may develop a recommendation to
                                            volumes of water deliveries to or discharges             SEC. 208. RATHBUN LAKE, CHARITON RIVER,                Congress for—
                                            from Lake Okeechobee & Vicinity, Water                              IOWA.                                         (A) the construction of a water resources
                                            Conservation Area I, Water Conservation                                                                         development project;
                                                                                                       Not later than 1 year after the date of en-
                                            Area II, Water Conservation Area III, East                                                                        (B) the structural or operational modifica-
                                                                                                     actment of this Act, the Secretary shall sub-
                                            Coast Canals, and the South Dade Convey-                                                                        tion of an existing water resources develop-
                                                                                                     mit to the Committee on Transportation and
                                            ance. Such report shall be aggregated and re-                                                                   ment project;
                                                                                                     Infrastructure of the House of Representa-
                                            ported in a format designed for the general                                                                       (C) such additional monitoring of, or
                                                                                                     tives and the Committee on Environment
                                            public, using maps or other widely under-
                                                                                                     and Public Works of the Senate a report that           adaptive management measures to carry out
                                            stood communication tools.
                                                                                                     evaluates—                                             with respect to, existing water resources de-
                                              (c) EFFECT.—In carrying out the evaluation
                                            under subsection (a)(1), nothing shall be con-             (1) the existing allocations of storage space        velopment projects, to respond to changing
                                            strued to authorize any new purpose for the              for Rathbun Lake, authorized pursuant to               conditions; or
                                            management of Lake Okeechobee or author-                 the Flood Control Act of 1954 (68 Stat. 1262;            (D) geographic areas within the Lower Mis-
                                            ize the Secretary to affect any existing au-             121 Stat. 1124), including the existing alloca-        sissippi River basin for additional study by
                                            thorized purpose, including flood protection             tion for municipal water supply;                       the Secretary.
                                            and management of Lake Okeechobee to pro-                  (2) the feasibility of expanding the existing          (2) ADDITIONAL CONSIDERATIONS.—Any fea-
                                            vide water supply for all authorized users.              allocation of storage for municipal water              sibility study carried out pursuant to a rec-
                                            SEC. 207. GREAT LAKES COASTAL RESILIENCY                 supply; and                                            ommendation under this subsection shall be
                                                       STUDY.                                          (3) the affordability of future municipal            considered to be a continuation of the com-
                                              (a) IN GENERAL.—In carrying out the com-               water supply allocations from Rathbun                  prehensive study required under subsection
                                            prehensive assessment of water resources                 Lake, for residential users of such future al-         (a).
                                            needs for the Great Lakes System under sec-              locations, at projected future costs.                    (d) COMPLETION OF STUDY; REPORT TO CON-
                                            tion 729 of the Water Resources Development              SEC. 209. REPORT ON THE STATUS OF RESTORA-             GRESS.—Not later than 3 years after the date
                                            Act of 1986 (33 U.S.C. 2267a), as required by                        TION IN THE LOUISIANA COASTAL              of enactment of this section, the Secretary
                                            section 1219 of the Water Resources Develop-                         AREA.                                      shall submit to the Committee on Transpor-
                                            ment Act of 2018 (132 Stat. 3811), the Sec-                Not later than 1 year after the date of en-          tation and Infrastructure of the House of
                                            retary shall—                                            actment of this Act, the Coastal Louisiana             Representatives and the Committee on Envi-
                                              (1) taking into account recent high lake               Ecosystem Protection and Restoration Task              ronment and Public Works of the Senate a
                                            levels within the Great Lakes, assess and                Force established by section 7004 of Water             report detailing—
                                            make recommendations to Congress on—                     Resources Development Act of 2007 (121 Stat.             (1) the results of the comprehensive study
                                              (A) coastal storm and flood risk manage-               1272) shall submit to Congress a report that           required by this section, including any rec-
                                            ment measures, including measures that use               summarizes the activities and recommenda-              ommendations developed under subsection
                                            natural features and nature-based features,              tions of the task force, including—                    (c); and
                                            as those terms are defined in section 1184 of              (1) policies, strategies, plans, programs,             (2) any interim actions relating to existing
                                            the Water Resources Development Act of                   projects, and activities undertaken for ad-            water resources development projects under-
                                            2016 (33 U.S.C. 2289a);                                  dressing conservation, protection, restora-            taken by the Secretary during the study pe-
                                              (B) operation and maintenance of the                   tion, and maintenance of the coastal Lou-              riod.
                                            Great Lakes Navigation System, as such                   isiana ecosystem; and                                  SEC.    211.   UPPER MISSISSIPPI   RIVER   COM-
                                            term is defined in section 210 of the Water                (2) financial participation by each agency                          PREHENSIVE PLAN.
                                            Resources Development Act of 1986 (33 U.S.C.             represented on the Task Force in conserving,             (a) ASSESSMENT.—The Secretary shall con-
                                            2238);                                                   protecting, restoring, and maintaining the             duct an assessment of the water resources
                                              (C) ecosystem protection and restoration;              coastal Louisiana ecosystem.                           needs of the Upper Mississippi River under




dlhill on DSK120RN23PROD with HOUSE
                                              (D) the prevention and control of invasive             SEC.   210.  LOWER MISSISSIPPI RIVER COM-              section 729 of the Water Resources Develop-
                                            species and the effects of invasive species;                          PREHENSIVE STUDY.                         ment Act of 1986 (33 U.S.C. 2267a).
                                            and                                                          (a) COMPREHENSIVE STUDY.—                            (b) REQUIREMENTS.—The Secretary shall
                                              (E) recreation associated with water re-                   (1) IN GENERAL.—The Secretary shall con-           carry out the assessment under subsection
                                            sources development projects;                            duct a comprehensive study of the Lower                (a) in accordance with the requirements in
                                              (2) prioritize actions necessary to protect            Mississippi  River    basin,  from    Cape             section 1206(b) of Water Resources Develop-
                                            critical public infrastructure, communities,             Girardeau, Missouri, to the Gulf of Mexico,            ment Act of 2016 (130 Stat. 1686).




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00056   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016    H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                       H3939
                                            SEC. 212. LOWER MISSOURI BASIN FLOOD RISK                  (7) PRECONSTRUCTION, ENGINEERING, AND DE-             1962 (76 Stat. 1173), as required to be expe-
                                                        AND RESILIENCY STUDY, IOWA, KAN-             SIGN.—Upon completion of a study author-                dited under section 1317 of the Water Re-
                                                        SAS, NEBRASKA, AND MISSOURI.                 ized by this section, if the Secretary deter-           sources Development Act of 2018 (Public Law
                                              (a) ADDITIONAL STUDIES.—                               mines that a recommended project, or modi-              115–270).
                                              (1) IN GENERAL.—Except as provided in                  fication to a project described in paragraph            SEC. 214. COUGAR AND DETROIT DAMS, WILLAM-
                                            paragraph (2), upon the request of the non-              (1), is justified, the Secretary may proceed                        ETTE RIVER BASIN, OREGON.
                                            Federal interest for the Lower Missouri                  directly to preconstruction planning, engi-               (a) REPORT.—Not later than 2 years after
                                            Basin study, the Secretary shall expand the              neering, and design of the project or modi-             the date of enactment of this Act, the Sec-
                                            scope of such study to investigate and pro-              fication.                                               retary shall submit to the Committee on
                                            vide recommendations relating to—                          (8) TECHNICAL ASSISTANCE.—                            Transportation and Infrastructure of the
                                              (A) modifications to projects in Iowa, Kan-              (A) IN GENERAL.—For the provision of tech-            House of Representatives and the Committee
                                            sas, Nebraska, and Missouri authorized                   nical assistance to support small commu-                on Environment and Public Works of the
                                            under the Pick-Sloan Missouri River Basin                nities and economically disadvantaged com-              Senate, and make publicly available, a re-
                                            Program (authorized by section 9(b) of the               munities in the planning and design of flood            port providing an initial analysis of
                                            Flood Control Act of December 22, 1944                   risk management and flood risk resiliency               deauthorizing hydropower as a project pur-
                                            (chapter 665, 58 Stat. 891)) and the Missouri            projects in the Lower Missouri River Basin,             pose at the Cougar and Detroit Dams
                                                                                                     for each of fiscal years 2021 through 2026,             project.
                                            River Bank Stabilization and Navigation
                                                                                                     there are authorized to be appropriated—                  (b) CONTENTS.—The Secretary shall include
                                            project (authorized by section 2 of the Act of                                                                   in the report submitted under subsection
                                                                                                       (i) $2,000,000 to carry out section 206 of the
                                            March 2, 1945 (chapter 19, 59 Stat. 19)), in-                                                                    (a)—
                                                                                                     Flood Control Act of 1960 (33 U.S.C. 709a), in
                                            cluding modifications to the authorized pur-                                                                       (1) a description of the potential effects of
                                                                                                     addition to amounts otherwise authorized to
                                            poses of such projects to further flood risk                                                                     deauthorizing hydropower as a project pur-
                                                                                                     carry out such section; and
                                            management and resiliency; and                                                                                   pose at the Cougar and Detroit Dams project
                                                                                                       (ii) $2,000,000 to carry out section 22(a)(2) of
                                              (B) modifications to non-Federal, publicly                                                                     on—
                                                                                                     the Water Resources Development Act of
                                            owned levees in the Lower Missouri River                                                                           (A) the operation of the project, including
                                                                                                     1974 (42 U.S.C. 1962d–16), in addition to
                                            Basin.                                                                                                           with respect to the other authorized pur-
                                                                                                     amounts otherwise authorized to carry out
                                              (2) EXCEPTION.—If the Secretary deter-                 such section.                                           poses of the project;
                                            mines that expanding the scope of the Lower                (B) CONDITIONS.—                                        (B) compliance of the project with the En-
                                            Missouri Basin study as provided in para-                  (i) LIMITATIONS NOT APPLICABLE.—The limi-             dangered Species Act;
                                            graph (1) is not practicable, and the non-Fed-           tations on the use of funds in section 206(d)             (C) costs that would be attributed to other
                                            eral interest for such study concurs in such             of the Flood Control Act of 1960 and section            authorized purposes of the project, including
                                            determination, the Secretary shall carry out             22(c)(2) of the Water Resources Development             costs relating to compliance with such Act;
                                            such additional studies as are necessary to              Act of 1974 shall not apply to the amounts              and
                                            investigate the modifications described in               authorized to be appropriated by subpara-                 (D) other ongoing studies in the Willam-
                                            paragraph (1).                                           graph (A).                                              ette River Basin; and
                                              (3) CONTINUATION OF LOWER MISSOURI BASIN                 (ii) RULE OF CONSTRUCTION.—Nothing in                   (2) identification of any further research
                                            STUDY.—The following studies shall be con-
                                                                                                     this paragraph restricts the authority of the           needed.
                                            sidered a continuation of the Lower Missouri             Secretary to use any funds otherwise appro-               (c) PROJECT DEFINED.—In this section, the
                                            Basin study:                                             priated to carry out section 206 of the Flood           terms ‘‘Cougar and Detroit Dams project’’
                                              (A) Any additional study carried out under             Control Act of 1960 or section 22(a)(2) of the          and ‘‘project’’ mean the Cougar Dam and
                                            paragraph (2).                                           Water Resources Development Act of 1974 to              Reservoir project and Detroit Dam and Res-
                                              (B) Any study recommended to be carried                provide technical assistance described in               ervoir project, Willamette River Basin, Or-
                                            out in a report that the Chief of Engineers              subparagraph (A).                                       egon, authorized by section 204 of the Flood
                                            prepares for the Lower Missouri Basin study.               (9) COMPLETION OF STUDY; REPORT TO CON-               Control Act of 1950 (64 Stat. 179).
                                              (C) Any study recommended to be carried                GRESS.—Not later than 3 years after the date            SEC. 215. PORT ORFORD, OREGON.
                                            out in a report that the Chief of Engineers              of enactment of this Act, the Secretary shall             Not later than 180 days after the date of
                                            prepares for an additional study carried out             submit to the Committee on Transportation               enactment of this Act, the Secretary shall,
                                            under paragraph (2).                                     and Infrastructure of the House of Rep-                 at Federal expense, submit to the Committee
                                              (D) Any study spun off from the Lower                  resentatives and the Committee on Environ-              on Transportation and Infrastructure of the
                                            Missouri Basin study before the completion               ment and Public Works of the Senate a re-               House of Representatives and the Committee
                                            of such study.                                           port detailing—                                         on Environment and Public Works of the
                                              (E) Any study spun off from an additional                (A) the results of the study authorized by            Senate a summary report on the research
                                            study carried out under paragraph (2) before             this section;                                           completed and data gathered by the date of
                                            the completion of such additional study.                   (B) any additional, site-specific areas with-         enactment of this Act with regards to the
                                              (4) RELIANCE ON EXISTING INFORMATION.—In               in the Lower Missouri River Basin for which             configuration of a breakwater for the project
                                            carrying out any study described in or au-               additional study for flood risk management              for navigation, Port Orford, Oregon, author-
                                            thorized by this section, the Secretary, to              projects is recommended by the Secretary;               ized by section 117 of the River and Harbor
                                            the extent practicable, shall rely on existing           and                                                     Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for
                                            data and analysis, including data and anal-                (C) any interim actions relating to existing          the purposes of addressing shoaling issues to
                                            ysis prepared under section 22 of the Water              water resources development projects under-             minimize long-term maintenance costs.
                                            Resources Development Act of 1974 (42 U.S.C.             taken by the Secretary during the study pe-             SEC. 216. WILSON CREEK AND SLOAN CREEK,
                                            1962d–16).                                               riod.                                                              FAIRVIEW, TEXAS.
                                              (5) CONSIDERATION; CONSULTATION.—In de-                  (b) DEFINITIONS.—In this section:                       Not later than 180 days after the date of
                                            veloping recommendations under paragraph                   (1) LOWER MISSOURI BASIN STUDY.—The                   enactment of this section, the Secretary
                                            (1), the Secretary shall—                                term ‘‘Lower Missouri Basin study’’ means               shall submit to Congress a written status up-
                                              (A) consider the use of—                               the Lower Missouri Basin Flood Risk and                 date regarding efforts to address flooding
                                              (i) structural and nonstructural measures,             Resiliency Study, Iowa, Kansas, Nebraska,               along Wilson Creek and Sloan Creek in the
                                            including the setting back of levees and re-             and Missouri, authorized pursuant to section            City of Fairview, Texas.
                                            moving structures from areas of recurring                216 of the Flood Control Act of 1970 (33 U.S.C.         SEC.    217.   GAO STUDY ON MITIGATION FOR
                                            flood vulnerability, where advantageous, to              549a).                                                                  WATER RESOURCES DEVELOPMENT
                                            reduce flood risk and damages in the Lower                 (2) SMALL COMMUNITY.—The term ‘‘small                                 PROJECTS.
                                            Missouri River Basin; and                                community’’ means a local government that                 Not later than 18 months after the date of
                                              (ii) where such features are locally accept-           serves a population of less than 15,000.                enactment of this Act, the Comptroller Gen-
                                            able, natural features or nature-based fea-              SEC.    213.       PORTSMOUTH   HARBOR   AND            eral of the United States shall—
                                            tures (as such terms are defined in section                              PISCATAQUA RIVER AND RYE HAR-             (1) conduct a study on the mitigation of
                                            1184 of the Water Resources Development                                  BOR, NEW HAMPSHIRE.                     the impact of water resources development
                                            Act of 2016 (33 U.S.C. 2289a); and                         Not later than 180 days after the date of             projects, including the impact on fish and
                                              (B) consult with applicable Federal and                enactment of this Act, the Secretary shall              wildlife, consistent with the requirements of
                                            State agencies, Indian Tribes, and other                 submit to Congress a written status update              section 906 of the Water Resources Develop-
                                            stakeholders within the Lower Missouri                   regarding—                                              ment Act of 1986 (33 U.S.C. 2283), section
                                            River Basin and solicit public comment on                  (1) efforts to address the impacts of                 307(a) of the Water Resources Development




dlhill on DSK120RN23PROD with HOUSE
                                            such recommendations.                                    shoaling affecting the project for navigation,          Act of 1990 (33 U.S.C. 2317(a)), and section
                                              (6) EXEMPTION FROM MAXIMUM STUDY COST                  Rye Harbor, New Hampshire, authorized by                2036(b) of the Water Resources Development
                                            AND DURATION LIMITATIONS.—Section 1001 of                section 101 of the River and Harbor Act of              Act of 2007 (33 U.S.C. 2283a), including—
                                            the Water Resources Reform and Develop-                  1960 (74 Stat. 480); and                                  (A) an evaluation of guidance or instruc-
                                            ment Act of 2014 (33 U.S.C. 2282c) shall not               (2) the project for navigation, Portsmouth            tions issued, and other measures taken, by
                                            apply to the Lower Missouri Basin study or               Harbor and Piscataqua River, authorized by              the Secretary to ensure successful mitiga-
                                            any study described in paragraph (3).                    section 101 of the River and Harbor Act of              tion of such impacts;




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00057    Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016    H29JYPT1
                                            H3940                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                              (B) a review of the methods of mitigation,               (D) projects assigned to harbors and inland          troller General of the United States shall
                                            including the use of in-lieu fees, mitigation            harbors within the Great Lakes Navigation              conduct, and submit to the Committee on
                                            banking, and permittee-responsible mitiga-               System (as defined in such section);                   Transportation and Infrastructure of the
                                            tion, and their long-term effectiveness of re-             (4) an assessment of any deferred operation          House of Representatives and the Committee
                                            storing or mitigating ecosystem services im-             and maintenance needs for such projects;               on Environment and Public Works of the
                                            pacted by such projects;                                   (5) an assessment of the annual funding              Senate a report on the results of, a study on
                                              (C) a review of how the use of the different           level trends for moderate-use harbor projects          commercial concessionaires at Corps of En-
                                            mitigation methods for such projects varies              (as defined in section 210 of the Water Re-            gineers recreational facilities.
                                            across Corps of Engineers districts;                     sources Development Act of 1986 on the day               (b) REQUIREMENTS.—The study under sub-
                                              (D) an assessment of the backlog of mitiga-            before the date of enactment of this Act)              section (a) shall include—
                                            tion projects, including the number of miti-             after the date of enactment of the Water Re-             (1) an analysis of Corps of Engineers poli-
                                            gation projects pending completion to ad-                sources Development Act of 2014 (Public Law            cies as they relate to the pricing of items
                                            dress such impacts resulting from con-                   113–121), excluding funds awarded to donor             sold by commercial concessionaires at Corps
                                            structed    water    resources    development            ports, medium-sized donor ports, and energy            of Engineers recreational facilities, includ-
                                            projects;                                                transfer ports (as such terms are defined in           ing commoditized goods such as fuel and food
                                              (E) an evaluation of how the Secretary                 section 2106 of the Water Resources Reform             items;
                                            tracks compliance with the mitigation re-                and Development Act of 2014 (33 U.S.C. 2201));           (2) an assessment of the impact of gross
                                            quirements across Corps of Engineers dis-                  (6) an assessment of projected needs associ-         revenue fees on—
                                            tricts;                                                  ated with donor ports, medium-sized donor                (A) the sales of items described in para-
                                              (F) a review of how the mitigation require-            ports, and energy transfer ports (as such              graph (1);
                                            ments for water resources development                    terms are defined in section 2106 of the Water           (B) the total revenues collected by com-
                                            projects contributes to the resilience of                Resources Reform and Development Act of                mercial concessionaires at Corps of Engi-
                                            water resources in the United States;                    2014 (33 U.S.C. 2201)); and                            neers recreational facilities; and
                                              (G) an assessment of whether mitigation is               (7) an itemization of expenditures provided            (C) the amounts of the moneys paid by
                                            being done prior to or contemporaneously                 to donor ports, medium-sized donor ports,              such concessionaires to the United States—
                                            with the construction of projects, as required           and energy transfer ports under section 2106             (i) amounts equivalent to which are appro-
                                            by section 906 of the Water Resources Devel-             of the Water Resources Reform and Develop-             priated to the Corps of Engineers for oper-
                                            opment Act of 1986 (33 U.S.C. 2283);                     ment Act of 2014 (33 U.S.C. 2201).                     ation and maintenance of recreational facili-
                                              (H) an evaluation of compliance with sec-                (b) REPORT TO CONGRESS.—Upon comple-                 ties; or
                                            tion 906(d) of the Water Resources Develop-              tion of the report under subsection (a), the             (ii) that are distributed to States and
                                            ment Act of 1986 (33 U.S.C. 2283(d)) for the de-         Comptroller General shall submit such re-              counties under section 7 of the Act of August
                                            velopment of specific mitigation plans for               port to the Committee on Transportation                18, 1941 (33 U.S.C. 701c–3);
                                            projects, whether such plans were successful             and Infrastructure of the House of Rep-                  (3) an assessment of the potential impact
                                            in mitigating the designated impacts of the              resentatives and the Committee on Environ-             of using a fixed revenue fee on the sales, rev-
                                            projects, and, in instances where such plans             ment and Public Works of the Senate.                   enues, and amounts described in paragraph
                                            were not successful, what actions the Sec-               SEC. 219. GAO STUDY ON ADMINISTRATION OF               (2);
                                            retary is taking to modify the plans such                           ENVIRONMENTAL BANKS.                          (4) an analysis of Corps of Engineers poli-
                                            that they will be successful; and                          (a) IN GENERAL.—Not later than one year              cies related to the length of commercial con-
                                              (I) an assessment of how the Secretary                 after the date of enactment of this Act, the           cessionaire contracts;
                                            might take advantage of natural infrastruc-              Comptroller General of the United States                 (5) an assessment of the impacts of chang-
                                            ture in mitigation planning to reduce flood              shall conduct a study and submit to the ap-            ing the length of commercial concessionaire
                                            risks and flood recovery costs for some com-             propriate committees of Congress a report              contracts to a minimum of 25 years, includ-
                                            munities; and                                            that analyzes the administration of section            ing assessment of—
                                              (2) submit to Congress a report that—                  309 of the Coastal Wetlands Planning, Pro-               (A) the potential effects on monetary in-
                                              (A) describes the results of the study con-            tection and Restoration Act to establish an            vestment in Corps of Engineers properties by
                                            ducted under paragraph (1);                              environmental bank (as defined in such sec-            commercial        concessionaires,   including
                                              (B) includes recommendations to ensure                 tion), such that the Secretary—                        whether establishing such a minimum con-
                                            compliance with and successful implementa-                 (1) achieves the objectives of the report of         tract length would lead to increased invest-
                                            tion of mitigation requirements for water re-            the Chief of Engineers for ecosystem restora-          ment; and
                                            sources development projects; and                        tion in the Louisiana Coastal Area or the ob-            (B) whether establishing such a minimum
                                              (C) includes recommendations to ensure                 jectives of the comprehensive coastal protec-          contract length would reduce competition,
                                            existing programs and authorities include                tion master plan entitled ‘‘Louisiana Com-             or result in commercial concessionaires pro-
                                            the use, to the maximum extent practicable,              prehensive Master Plan for a Sustainable               viding less value to the public or to water re-
                                            of natural infrastructure.                               Coast’’ prepared by the State of Louisiana             sources development projects; and
                                                                                                     and accepted by the Louisiana Coastal Pro-               (6) an assessment of whether changes in
                                            SEC. 218. GAO STUDY ON APPLICATION OF HAR-
                                                        BOR MAINTENANCE TRUST FUND EX-               tection and Restoration Authority (includ-             the concessionaire fee structure or the min-
                                                        PENDITURES.                                  ing any subsequent amendments or revi-                 imum length of a commercial concessionaire
                                                                                                     sions);                                                contract is in the public interest.
                                              (a) STUDY.—Not later than 18 months after                (2) promotes ridge restoration, barrier is-          SEC. 221. STUDY ON WATER SUPPLY AND WATER
                                            the date of enactment of this Act, the Comp-             land restoration, marsh creation, non-                             CONSERVATION   AT  WATER   RE-
                                            troller General of the United States shall               structural risk management, or any other                           SOURCES DEVELOPMENT PROJECTS.
                                            conduct a study of the operation and mainte-             projects authorized, funded, or undertaken,              (a) IN GENERAL.—Not later than 18 months
                                            nance needs of federally authorized harbor               or proposed to be authorized, funded, or un-           after the date of enactment of this Act, the
                                            and inland harbor projects, including—                   dertaken, pursuant to such comprehensive               Secretary shall submit to the Committee on
                                              (1) an inventory of all federally authorized           coastal protection master plan;                        Transportation and Infrastructure of the
                                            harbor and inland harbor projects;                         (3) allows for proactive investment in               House of the Representatives and the Com-
                                              (2) an assessment of current uses of such              projects by a public or private entity seeking         mittee on Environment and Public Works of
                                            projects (and, to the extent practicable, the            to generate credits to satisfy responsibilities        the Senate a report that analyzes the bene-
                                            national, regional, and local benefits of such           associated with environmental compliance;              fits and consequences of including municipal
                                            uses), including the uses listed in section                (4) allows for leveraging additional State,          water supply and water conservation as a
                                            210(d)(2)(B) of the Water Resources Develop-             Parish, or Federal funds; and                          primary mission of the Corps of Engineers in
                                            ment Act of 1986;                                          (5) recommends methods for awarding ad-              carrying out water resources development
                                              (3) an assessment of the annual operation              ditional credit for high-priority projects list-       projects.
                                            and maintenance needs associated with har-               ed in the report and plan described in para-             (b) INCLUSION.—The Secretary shall include
                                            bors and inland harbors referred to in sub-              graph (1).                                             in the report submitted under subsection
                                            section (a)(2) of section 210 of the Water Re-             (b) CONSULTATION WITH STAKEHOLDERS.—In               (a)—
                                            sources Development Act of 1986 (33 U.S.C.               carrying out subsection (a), the Comptroller             (1) a description of existing water re-
                                            2238), including a breakdown of such needs               General of the United States shall consult             sources development projects with municipal
                                            for each of the following types of projects—             with the Secretary, the Louisiana Coastal              water supply or water conservation as au-
                                              (A) emerging harbor projects (as defined in            Wetlands Conservation and Restoration Task             thorized purposes, and the extent to which
                                                                                                     Force, the Governor of Louisiana (or an ap-




dlhill on DSK120RN23PROD with HOUSE
                                            such section);                                                                                                  such projects are utilized for such purposes;
                                              (B) moderate-use harbor projects (as de-               pointee), and other stakeholders, to the ex-             (2) a description of existing water re-
                                            fined in such section on the day before the              tent practicable.                                      sources development projects with respect to
                                            date of enactment of this Act);                          SEC. 220. STUDY ON CORPS OF ENGINEERS CON-             which—
                                              (C) high-use harbor projects (as defined in                        CESSIONAIRE AGREEMENTS.                      (A) municipal water supply or water con-
                                            such section on the day before the date of en-             (a) STUDY.—Not later than 1 year after the           servation could be added as a project pur-
                                            actment of this Act); and                                date of enactment of this Act, the Comp-               pose, including those with respect to which a




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00058   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                      H3941
                                            non-Federal interest has expressed an inter-             opment of innovative technologies and meth-               (A) DEAUTHORIZATION AMOUNT.—The Sec-
                                            est in adding municipal water supply or                  odologies for the detection, treatment, and            retary shall prepare a proposed list of
                                            water conservation as a project purpose; and             cleanup of PFAS associated with Federal fa-            projects for deauthorization comprised of a
                                              (B) such a purpose could be accommodated               cilities, including groundwater associated             subset of projects and separable elements
                                            while maintaining existing authorized pur-               with such facilities.                                  identified on the preliminary list developed
                                            poses;                                                     (2) DUPLICATION OF EFFORTS.—Nothing in               under paragraph (1) that have, in the aggre-
                                              (3) a description of ongoing water resources           this subsection is intended to duplicate the           gate, an estimated Federal cost to complete
                                            development project studies the authoriza-               activities undertaken by other Federal agen-           that is at least $10,000,000,000.
                                            tions for which include authorization for the            cies as identified in subsection (a)(3).                  (B) DETERMINATION OF FEDERAL COST TO
                                            Secretary to study the feasibility of carrying             (c) DEFINITION.—In this section, the term            COMPLETE.—For purposes of subparagraph
                                            out the project with a purpose of municipal              ‘‘PFAS’’ means a perfluoroalkyl substance              (A), the Federal cost to complete shall take
                                            water supply or water conservation;                      or polyfluoroalkyl substance with at least             into account any allowances authorized by
                                              (4) an analysis of how adding municipal                one fully fluorinated carbon atom.                     section 902 of the Water Resources Develop-
                                            water supply and water conservation as a                 SEC. 223. REPORT ON RECREATIONAL FACILI-               ment Act of 1986 (33 U.S.C. 2280), as applied
                                            primary mission of the Corps of Engineers                           TIES.                                       to the most recent project schedule and cost
                                            would affect the ability of the Secretary to               No later than 18 months after the date of            estimate.
                                            carry out future water resources develop-                enactment of this Act, the Secretary shall                (C) INCLUSION OF DEAUTHORIZATION OF ANTI-
                                            ment projects; and                                       submit to the Committee on Transportation              QUATED PROJECTS.—The Secretary shall re-
                                              (5) any recommendations of the Secretary               and Infrastructure of the House of Rep-                duce the amount identified for deauthoriza-
                                            relating to including municipal water supply             resentatives and the Committee on Environ-             tion under paragraph (2)(A) by an amount
                                            and water conservation as a primary mission              ment and Public Works of the Senate a re-              equivalent to the estimated current value of
                                            of the Corps of Engineers.                               port that contains—                                    each project, or separable element of a
                                            SEC. 222. PFAS REVIEW AND INVENTORY AT                     (1) an inventory of all recreational infra-          project, that is deauthorized by subsection
                                                        CORPS FACILITIES.                            structure and facilities associated with               (f).
                                              (a) INVENTORY OF PFAS AT CORPS FACILI-                 water resources development projects;                     (3) SEQUENCING OF PROJECTS.—
                                            TIES.—                                                     (2) an assessment of the annual operation               (A) IN GENERAL.—The Secretary shall iden-
                                              (1) IN GENERAL.—Not later than 18 months               and maintenance needs associated with such             tify projects and separable elements for in-
                                            after the date of enactment of this section,             infrastructure and facilities;                         clusion on the proposed list of projects for
                                            and annually thereafter the Secretary shall                (3) an assessment of deferred operation and          deauthorization under paragraph (2) accord-
                                            complete an inventory of Corps of Engineers              maintenance needs for such infrastructure              ing to the order in which the projects and
                                            civil works facilities that are or may be con-           and facilities to operate safely at full capac-        separable elements were authorized, begin-
                                            taminated, or could become contaminated,                 ity; and                                               ning with the earliest authorized projects
                                            by PFAS.                                                   (4) an assessment of the economic benefits           and separable elements and ending with the
                                              (2) CONTENTS OF INVENTORY.—In carrying                 of recreation to local and regional economies          latest project or separable element necessary
                                            out this subsection, the Secretary shall re-
                                                                                                     and benefits of sustaining and improving               to meet the aggregate amount under para-
                                            view and identify—
                                                                                                     public access at recreational infrastructure           graph (2)(A).
                                              (A) all facilities owned or operated by the
                                                                                                     and facilities.                                           (B) FACTORS TO CONSIDER.—The Secretary
                                            Corps of Engineers, for which there is a civil
                                                                                                         TITLE III—DEAUTHORIZATIONS AND                     may identify projects and separable ele-
                                            works function, that are or may be contami-
                                                                                                                     MODIFICATIONS                          ments in an order other than that estab-
                                            nated, or could become contaminated, by
                                                                                                     SEC.    301. DEAUTHORIZATION OF INACTIVE               lished by subparagraph (A) if the Secretary
                                            PFAS;
                                              (B) the nature and extent of any such con-                          PROJECTS.                                 determines, on a case-by-case basis, that a
                                            tamination or potential for contamination,                   (a) PURPOSES.—The purposes of this section         project or separable element is critical for
                                            including any potential pathways for human               are—                                                   interests of the United States, based on the
                                            exposure to PFAS;                                          (1) to identify water resources development          possible impact of the project or separable
                                              (C) response measures taken to monitor,                projects authorized by Congress that are no            element on public health and safety, the na-
                                            control, remove, or remediate PFAS, or oth-              longer viable for construction due to—                 tional economy, or the environment.
                                            erwise reduce the risk of human exposure to                (A) a lack of local support;                            (4) PUBLIC COMMENT AND CONSULTATION.—
                                            PFAS;                                                      (B) a lack of available Federal or non-Fed-             (A) IN GENERAL.—The Secretary shall so-
                                              (D) for facilities identified under subpara-           eral resources; or                                     licit comments from the public and the Gov-
                                            graph (A), the extent to which such facilities             (C) an authorizing purpose that is no                ernors of each applicable State on the pro-
                                            (or any such contamination or potential for              longer relevant or feasible;                           posed deauthorization list prepared under
                                            contamination at such facilities) are related              (2) to create an expedited and definitive            paragraph (2)(A).
                                            to the civil works functions of the Corps of             process for Congress to deauthorize water re-             (B) COMMENT PERIOD.—The public comment
                                            Engineers;                                               sources development projects that are no               period shall be 90 days.
                                              (E) the extent to which the Secretary, or              longer viable for construction; and                       (5) PREPARATION OF FINAL DEAUTHORIZATION
                                            other entities, may have responsibility for                (3) to allow the continued authorization of          LIST.—
                                            such contamination or potential for con-                 water resources development projects that                 (A) IN GENERAL.—The Secretary shall pre-
                                            tamination; and                                          are viable for construction.                           pare a final deauthorization list by—
                                              (F) for facilities identified under subpara-             (b) PROPOSED DEAUTHORIZATION LIST.—                     (i) considering any comments received
                                            graph (A), the costs to remediate and reduce               (1) PRELIMINARY LIST OF PROJECTS.—                   under paragraph (4); and
                                            the risk of human exposure to PFAS.                        (A) IN GENERAL.—The Secretary shall de-                 (ii) revising the proposed deauthorization
                                              (3) COORDINATION WITH OTHER FEDERAL                    velop a preliminary list of each water re-             list prepared under paragraph (2)(A) as the
                                            AGENCIES.—To the maximum extent prac-                    sources development project, or separable              Secretary determines necessary to respond
                                            ticable, the actions taken under this sub-               element of a project, authorized for con-              to such comments.
                                            section shall supplement and support work                struction before November 8, 2007, for                    (B) APPENDIX.—The Secretary shall include
                                            undertaken by other Federal agencies, in-                which—                                                 as part of the final deauthorization list an
                                            cluding actions taken pursuant to the plan                 (i) planning, design, or construction was            appendix that—
                                            published by the Administrator of the Envi-              not initiated before the date of enactment of             (i) identifies each project or separable ele-
                                            ronmental Protection Agency, titled ‘‘EPA’s              this Act; or                                           ment on the proposed deauthorization list
                                            Per- and Polyfluoroalkyl Substances (PFAS)                 (ii) planning, design, or construction was           that is not included on the final deauthoriza-
                                            Action Plan’’ and dated February 2019.                   initiated before the date of enactment of this         tion list; and
                                              (4) REPORT TO CONGRESS.—Upon completion                Act, but for which no funds, Federal or non-              (ii) describes the reasons why the project
                                            of the inventory under paragraph (1), and an-            Federal, were obligated for planning, design,          or separable element is not included on the
                                            nually thereafter concurrent with the Presi-             or construction of the project or separable            final deauthorization list.
                                            dent’s annual budget request to Congress,                element of the project during the current fis-            (c) SUBMISSION OF FINAL DEAUTHORIZATION
                                            the Secretary shall submit the inventory to              cal year or any of the 10 preceding fiscal             LIST TO CONGRESS FOR CONGRESSIONAL RE-
                                            the Committee on Transportation and Infra-               years.                                                 VIEW; PUBLICATION.—
                                            structure of the House of Representatives                  (B) USE OF COMPREHENSIVE CONSTRUCTION                   (1) IN GENERAL.—Not later than 90 days
                                            and the Committee on Environment and                     BACKLOG AND OPERATION AND MAINTENANCE                  after the date of the close of the comment
                                            Public Works of the Senate.                              REPORT.—The Secretary may develop the                  period under subsection (b)(4), the Secretary




dlhill on DSK120RN23PROD with HOUSE
                                              (b) PFAS TECHNOLOGY RESEARCH.—                         preliminary list from the comprehensive                shall—
                                              (1) RESEARCH SUPPORT.—The Secretary,                   construction backlog and operation and                    (A) submit the final deauthorization list
                                            acting through the Hazardous Waste Re-                   maintenance reports developed pursuant to              and appendix prepared under subsection
                                            search Center located at the Engineer Re-                section 1001(b)(2) of the Water Resources De-          (b)(5) to the Committee on Transportation
                                            search and Development Center, shall, to the             velopment Act of 1986 (33 U.S.C. 579a).                and Infrastructure of the House of Rep-
                                            maximum extent practicable, support the ef-                (2) PREPARATION OF PROPOSED DEAUTHOR-                resentatives and the Committee on Environ-
                                            forts of other Federal agencies in the devel-            IZATION LIST.—                                         ment and Public Works of the Senate; and




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00059   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3942                                              CONGRESSIONAL RECORD — HOUSE                                                              July 29, 2020
                                              (B) publish the final deauthorization list                (B) the estimated current value of each              (2) in clause (iii), by striking ‘‘Arizona
                                            and appendix in the Federal Register.                    such project or separable element of a                 River Basins.’’ and inserting ‘‘Arkansas
                                              (2) EXCLUSIONS.—The Secretary shall not                project.                                               River Basins; and’’; and
                                            include in the final deauthorization list sub-              (g) ECONOMIC AND ENVIRONMENTAL REVIEW                (3) by adding at the end the following:
                                            mitted under paragraph (1) any project or                OF INACTIVE WATER RESOURCES DEVELOPMENT                 ‘‘(iv) to protect the Russian River Basin,
                                            separable element with respect to which                  PROJECTS.—The Secretary or the non-Fed-                California.’’.
                                            Federal funds for planning, design, or con-              eral interest may not carry out any author-            SEC. 306. REHABILITATION OF CORPS OF ENGI-
                                            struction are obligated after the develop-               ized water resources development project, or                       NEERS CONSTRUCTED DAMS.
                                            ment of the preliminary list under sub-                  separable element of such project, for which              Section 1177 of the Water Resources Devel-
                                            section (b)(1)(A) but prior to the submission            construction has not been initiated in the 20-         opment Act of 2016 (33 U.S.C. 467f–2 note) is
                                            of the final deauthorization list under para-            year period following the date of the author-          amended—
                                            graph (1)(A) of this subsection.                         ization of such project or separable element,             (1)   in    subsection    (e),   by    striking
                                              (d) DEAUTHORIZATION; CONGRESSIONAL RE-                 until—                                                 ‘‘$40,000,000’’ and inserting ‘‘$60,000,000’’; and
                                            VIEW.—
                                                                                                        (1) the Secretary provides to the Com-                 (2)   in    subsection    (f),   by    striking
                                              (1) IN GENERAL.—After the expiration of the            mittee on Transportation and Infrastructure            ‘‘$40,000,000’’ and inserting ‘‘$60,000,000’’.
                                            2-year period beginning on the date of publi-            of the House of Representatives and the                SEC. 307. CHESAPEAKE BAY ENVIRONMENTAL
                                            cation of the final deauthorization list and             Committee on Environment and Public                               RESTORATION AND PROTECTION
                                                                                                     Works of the Senate a post-authorization                          PROGRAM.
                                            appendix under subsection (c)(1)(B), a project
                                                                                                     change report that updates the economic and              (a) IN GENERAL.—Section 510 of the Water
                                            or separable element of a project identified
                                                                                                     environmental analysis of the project or sep-          Resources Development Act of 1996 (Public
                                            in the final deauthorization list is hereby de-
                                                                                                     arable element; and                                    Law 104–303, 110 Stat. 3759; 121 Stat. 1202; 128
                                            authorized, unless Congress passes a joint
                                                                                                        (2) the Committee on Transportation and             Stat. 1317) is amended—
                                            resolution disapproving the final deauthor-
                                                                                                     Infrastructure of the House of Representa-                (1) by redesignating subsection (h) as sub-
                                            ization list prior to the end of such period.
                                                                                                     tives and the Committee on Environment                 section (i) and inserting after subsection (g)
                                              (2) NON-FEDERAL CONTRIBUTIONS.—
                                                                                                     and Public Works of the Senate take appro-             the following:
                                              (A) IN GENERAL.—A project or separable
                                                                                                     priate action to address any modifications to             ‘‘(h) PROJECT CAP.—The total cost of a
                                            element of a project identified in the final
                                                                                                     the economic and environmental analysis for            project carried out under this section may
                                            deauthorization list under subsection (c)
                                                                                                     the project or separable element of the                not exceed $15,000,000.’’; and
                                            shall not be deauthorized under this sub-
                                                                                                     project contained in the post-authorization               (2) in subsection (i) (as so redesignated), by
                                            section if, before the expiration of the 2-year
                                                                                                     change report.                                         striking       ‘‘$40,000,000’’  and     inserting
                                            period referred to in paragraph (1), the non-
                                                                                                        (h) DEFINITIONS.—In this section:                   ‘‘$60,000,000’’.
                                            Federal interest for the project or separable
                                                                                                        (1) POST-AUTHORIZATION CHANGE REPORT.—                 (b) OUTREACH AND TRAINING.—The Sec-
                                            element of the project provides sufficient
                                                                                                     The term ‘‘post-authorization change re-               retary shall conduct public outreach and
                                            funds to complete the project or separable
                                                                                                     port’’ has the meaning given such term in              workshops for non-Federal interests to pro-
                                            element of the project.
                                                                                                     section 1132(d) of the Water Resources Devel-          vide information on the Chesapeake Bay en-
                                              (B) TREATMENT OF PROJECTS.—Notwith-
                                                                                                     opment Act of 2016 (33 U.S.C. 2282e).                  vironmental restoration and protection pro-
                                            standing subparagraph (A), each project and
                                                                                                        (2) POST-AUTHORIZATION STUDY.—The term              gram established under section 510 of the
                                            separable element of a project identified in
                                                                                                     ‘‘post-authorization study’’ means—                    Water Resources Development Act of 1996,
                                            the final deauthorization list shall be treated
                                                                                                        (A) a feasibility report developed under            including how to participate in the program.
                                            as deauthorized for purposes of the aggregate
                                                                                                     section 905 of the Water Resources Develop-            SEC. 308. UPPER MISSISSIPPI RIVER SYSTEM EN-
                                            deauthorization amount specified in sub-                                                                                    VIRONMENTAL MANAGEMENT PRO-
                                            section (b)(2)(A).                                       ment Act of 1986 (33 U.S.C. 2282);
                                                                                                        (B) a feasibility study, as defined in section                  GRAM.
                                              (3) PROJECTS IDENTIFIED IN APPENDIX.—A                                                                           Section 1103(e) of the Water Resources De-
                                            project or separable element of a project                105(d) of the Water Resources Development
                                                                                                     Act of 1986 (33 U.S.C. 2215(d)); or                    velopment Act of 1986 (33 U.S.C. 652(e)) is
                                            identified in the appendix to the final de-                                                                     amended—
                                            authorization list shall remain subject to fu-              (C) a review conducted under section 216 of
                                                                                                     the Flood Control Act of 1970 (33 U.S.C. 549a),           (1)   in    paragraph     (3),   by    striking
                                            ture deauthorization by Congress.                                                                               ‘‘$22,750,000’’ and inserting ‘‘$40,000,000’’; and
                                                                                                     including an initial appraisal that—
                                              (e) SPECIAL RULES.—                                       (i) demonstrates a Federal interest; and               (2)   in    paragraph     (4),   by    striking
                                              (1)    POST-AUTHORIZATION       STUDIES.—A                (ii) requires additional analysis for the           ‘‘$10,420,000’’ and inserting ‘‘$15,000,000’’.
                                            project or separable element of a project                project or separable element.                          SEC. 309. MCCLELLAN-KERR ARKANSAS RIVER
                                            may not be identified on the proposed de-                   (3)    WATER     RESOURCES      DEVELOPMENT                    NAVIGATION SYSTEM.
                                            authorization list developed under sub-                  PROJECT.—The term ‘‘water resources devel-               Any Federal funds, regardless of the ac-
                                            section (b), or the final deauthorization list           opment project’’ includes an environmental             count from which the funds were provided,
                                            developed under subsection (c), if the project           infrastructure assistance project or program           used to carry out construction of the modi-
                                            or separable element received funding for a              of the Corps of Engineers.                             fication to the McClellan-Kerr Arkansas
                                            post-authorization study during the current              SEC. 302. ABANDONED AND INACTIVE NONCOAL               River Navigation System, authorized in sec-
                                            fiscal year or any of the 10 preceding fiscal                        MINE RESTORATION.                          tion 136 of the Energy and Water Develop-
                                            years.                                                                                                          ment Appropriations Act, 2004 (117 Stat.
                                                                                                       Section 560(f) of the Water Resources De-
                                              (2) TREATMENT OF PROJECT MODIFICA-                                                                            1842), shall be considered by the Secretary as
                                                                                                     velopment Act of 1999 (33 U.S.C. 2336(f)) is
                                            TIONS.—For purposes of this section, if an au-                                                                  initiating construction of the project such
                                                                                                     amended by striking ‘‘$20,000,000’’ and insert-
                                            thorized    water    resources   development                                                                    that future funds will not require a new in-
                                                                                                     ing ‘‘$30,000,000’’.
                                            project or separable element of the project                                                                     vestment decision.
                                                                                                     SEC. 303. TRIBAL PARTNERSHIP PROGRAM.
                                            has been modified by an Act of Congress, the                                                                    SEC. 310. OUACHITA-BLACK RIVER NAVIGATION
                                            date of the authorization of the project or                Section 203(b)(4) of the Water Resources                         PROJECT, ARKANSAS.
                                            separable element shall be deemed to be the              Development Act of 2000 (33 U.S.C. 2269) is              The project for navigation, Ouachita-Black
                                            date of the most recent such modification.               amended by striking ‘‘$12,500,000’’ each place         River, Arkansas, authorized by section 101 of
                                                                                                     it appears and inserting ‘‘$15,000,000’’.              the River and Harbor Act of 1960 (Public Law
                                              (f)   DEAUTHORIZATION     OF    ANTIQUATED
                                                                                                     SEC. 304. LAKES PROGRAM.                               86–645), is modified to include water supply
                                            PROJECTS.—
                                              (1) IN GENERAL.—Any water resources de-                  Section 602(a) of the Water Resources De-            as a project purpose, subject to completion
                                            velopment project, or separable element of a             velopment Act of 1986 (Public Law 99–662, 100          by the Secretary of a feasibility study and
                                            project, authorized for construction prior to            Stat. 4148; 110 Stat. 3758; 113 Stat. 295; 121         any other review necessary for such modi-
                                            November 17, 1986, for which construction                Stat. 1076) is amended—                                fication.
                                            has not been initiated prior to the date of en-            (1) in paragraph (27), by striking ‘‘and’’ at        SEC. 311. SACRAMENTO RIVER, GLENN-COLUSA,
                                            actment of this Act, or for which funds have             the end;                                                           CALIFORNIA.
                                            not been obligated for construction in the 10-             (2) in paragraph (28), by striking the period          The portion of project for flood control,
                                            year period prior to the date of enactment of            at the end and inserting a semicolon; and              Sacramento River, California, authorized by
                                            this Act, is hereby deauthorized.                          (3) by adding at the end the following:              section 2 of the Act of March 1, 1917 (chapter
                                              (2) IDENTIFICATION.—Not later than 60 days               ‘‘(29) Ellis Pond and Guild Pond, Norwood,           144, 39 Stat. 949; 103 Stat. 649; 110 Stat. 3709;
                                            after the date of enactment of this Act, the             Massachusetts; and                                     112 Stat. 1841; 113 Stat. 299), consisting of a
                                            Secretary shall issue to the Committee on                  ‘‘(30) Memorial Pond, Walpole, Massachu-             riverbed gradient restoration facility at the
                                                                                                     setts.’’.                                              Glenn-Colusa Irrigation District Intake, is




dlhill on DSK120RN23PROD with HOUSE
                                            Transportation and Infrastructure of the
                                            House of Representatives and the Committee               SEC. 305. WATERCRAFT INSPECTION STATIONS.              no longer authorized beginning on the date
                                            on Environment and Public Works of the                     Section 104(d)(1)(A) of the River and Har-           of enactment of this Act.
                                            Senate a report that identifies—                         bor Act of 1958 (33 U.S.C. 610(d)(1)(A)) is            SEC. 312. LAKE ISABELLA, CALIFORNIA.
                                              (A) the name of each project, or separable             amended—                                                 (a) SENSE OF CONGRESS.—It is the sense of
                                            element of a project, deauthorized by para-                (1) in clause (ii), by striking ‘‘; and’’ and        Congress that the Secretary, when evalu-
                                            graph (1); and                                           inserting a semicolon;                                 ating alternative locations for construction




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00060   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                       H3943
                                            of a permanent Isabella Lake Visitor Center              Pierhead line; thence northerly along said              thence to a point East 1,315,584.30 and North
                                            by the Corps of Engineers to replace the fa-             Pierhead line, to the intersection of the eas-          439,388.30, thence to a point East 1,315,259.31
                                            cility impacted by the Isabella Dam safety               terly right of way line of Van Ness Avenue,             and North 438,908.30.
                                            modification project, should afford substan-             formerly Marlette Street, prolongation to                 (2) A transition area 200 foot wide to 300
                                            tial weight to the site preference of the local          the Pierhead line.                                      foot wide, 15 foot deep, with a center line be-
                                            community.                                                 ‘‘(b) REQUIREMENT THAT AREA BE IM-                    ginning at a point East 1,315,259.31 and North
                                               (b) AUTHORITY.—The Secretary may ac-                  PROVED.—The declaration of nonnavigability              438,908.30 to a point East 1,315,044.31 and
                                            quire such interests in real property as the             under subsection (a) applies only to those              North 438,748.30.
                                            Secretary determines necessary or advisable              parts of the area described in subsection (a)             (3) A 300 foot wide, 15 foot deep channel
                                            to support construction of the Isabella Dam              that are or will be bulkheaded, filled, or oth-         with a centerline beginning a point East
                                            safety modification project.                             erwise occupied or covered by permanent                 1,315,044.31 and North 438,748.30, thence to a
                                               (c) TRANSFER.—The Secretary may trans-                structures and does not affect the applica-             point East 1,314,105.31 and North 438,124.79,
                                            fer any real property interests acquired                 bility of any Federal statute or regulation             thence to a point East 1,311,973.30 and North
                                            under subsection (b) to any other Federal                that relates to filling of navigable waters or          438,807.78, thence to a point East 1,311,369.73
                                            agency or department without reimburse-                  to other regulated activities within the area           and North 438,577.42, thence to a point East
                                            ment.                                                    described in subsection (a), including sec-             1,311,015.73 and North 438,197.57, thence to a
                                               (d) ISABELLA DAM SAFETY MODIFICATION                  tions 9 and 10 of the Act of March 3, 1899 (33          point East 1,309,713.47 and North 435,678.91.
                                            PROJECT DEFINED.—In this section, the term               U.S.C. 401, 403), section 404 of the Federal              (4) A transition area 300 foot wide to 400
                                            ‘‘Isabella Dam safety modification project’’             Water Pollution Control Act, and the Na-                foot wide, 15 foot deep to 24 foot deep, with
                                            means the dam safety modification project                tional Environmental Policy Act of 1969.                a center line beginning at a point East
                                            at the Isabella Reservoir in the San Joaquin               ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC               1,309,713.47 and North 435,678.91 to a point
                                            Valley, California (authorized by Act of De-             DISTRICT.—Congress finds and declares that              East 1,307,709.33 and North 434,488.25.
                                            cember 22, 1944 (chapter 665, 58 Stat. 901)), in-        the area described in subsection (a) contains             (5) A 400 foot wide, 24 foot deep channel
                                            cluding the component of the project relat-              the seawall, piers, and wharves that com-               with a centerline beginning at a point East
                                            ing to construction a visitor center facility.           prise the Embarcadero Historic District list-           1,307,709.33 and North 434,488.25, thence to a
                                            SEC. 313. LOWER SAN JOAQUIN RIVER FLOOD                  ed on the National Register of Historic                 point East 1,307,459.33 and North 434,173.25,
                                                       CONTROL PROJECT.                              Places on May 12, 2006.’’.                              thence to a point East 1,306,476.82 and North
                                              The Secretary shall align the schedules of,              (b) CONFORMING AMENDMENT.—Section 5052                1,306,476.82, thence to a point East 1,306,209.79
                                            and maximize complimentary efforts, mini-                of the Water Resources Development Act of               and North 431,460.21, thence to a point at the
                                            mize duplicative practices, and ensure co-               2007 (33 U.S.C. 59h–1) is repealed.                     end of the channel near Hains Point East
                                            ordination and information sharing with re-              SEC.   316.     WESTERN PACIFIC INTERCEPTOR             1,305,997.63 and North 429,978.31.
                                            spect to—                                                                CANAL, SACRAMENTO RIVER, CALI-          SEC. 320. BIG CYPRESS SEMINOLE INDIAN RES-
                                              (1) the project for flood risk management,                             FORNIA.                                             ERVATION WATER CONSERVATION
                                                                                                                                                                         PLAN, FLORIDA.
                                            Lower San Joaquin River, authorized by sec-                The portion of the project for flood protec-
                                            tion 1401(2) of the Water Resources Develop-             tion on the Sacramento River, authorized by               The project for ecosystem restoration, Big
                                                                                                                                                             Cypress Seminole Indian Reservation Water
                                            ment Act of 2018 (132 Stat. 3836); and                   section 2 of the of March 1, 1917 (chapter 144,
                                                                                                                                                             Conservation Plan, Florida, authorized pur-
                                              (2) the second phase of the feasibility study          39 Stat. 949; 45 Stat. 539; 50 Stat. 877; 55 Stat.
                                                                                                                                                             suant to section 528 of the Water Resources
                                            for the Lower San Joaquin River project for              647; 80 Stat. 1422), consisting of the portion of
                                                                                                                                                             Development Act of 1996 (110 Stat. 3767), is no
                                            flood risk management, authorized for expe-              the levee from GPS coordinate N2147673.584
                                                                                                                                                             longer authorized beginning on the date of
                                            dited completion by section 1203(a)(7) of the            E6690904.187 to N2147908.413 E6689057.060 asso-         enactment of this Act.
                                            Water Resources Development Act 2018 (132                ciated with the Western Pacific Interceptor
                                                                                                                                                             SEC. 321. CENTRAL EVERGLADES, FLORIDA.
                                            Stat. 3803).                                             Canal, is no longer authorized beginning on
                                                                                                                                                               The project for ecosystem restoration,
                                            SEC. 314. SAN DIEGO RIVER AND MISSION BAY,               the date of the enactment of this Act.
                                                                                                                                                             Central Everglades, authorized by section
                                                        SAN DIEGO COUNTY, CALIFORNIA.                SEC. 317. RIO GRANDE ENVIRONMENTAL MAN-                 1401(4) of the Water Resources Development
                                              The portion of the project for flood control                       AGEMENT PROGRAM, COLORADO,
                                                                                                                                                             Act of 2016 (130 Stat. 1713), is modified to in-
                                            and navigation, San Diego River and Mission                          NEW MEXICO, AND TEXAS.
                                                                                                                                                             clude the project for ecosystem restoration,
                                            Bay, San Diego County, California, author-                 Section 5056(f) of the Water Resources De-            Central and Southern Florida, Everglades
                                            ized by the Act of July 24, 1946 (chapter 595,           velopment Act of 2007 (Public Law 110–114,              Agricultural Area, authorized by section 1308
                                            60 Stat. 636), identified in the National Levee          121 Stat. 1213; 128 Stat. 1314) is amended by           of the Water Resources Development Act of
                                            Database established under section 9004 of               striking ‘‘2019’’ and inserting ‘‘2029’’.               2018 (132 Stat. 3819), and to authorize the Sec-
                                            the Water Resources Development Act of                   SEC. 318. NEW LONDON HARBOR WATERFRONT                  retary to carry out the project as so com-
                                            2007 (33 U.S.C. 3303) as the San Diego River 3                       CHANNEL, CONNECTICUT.                       bined.
                                            segment and consisting of a 785-foot-long                  (a) IN GENERAL.—The portion of the project            SEC. 322. MIAMI RIVER, FLORIDA.
                                            segment of the right bank levee from Station             for navigation, New London Harbor, Con-                   The portion of the project for navigation,
                                            209+41.75 to its end at Station 217+26.75, as            necticut, authorized by the first section of            Miami River, Florida, authorized by the Act
                                            described in construction plans dated August             the Act of June 13, 1902 (chapter 1079, 32 Stat.        of July 3, 1930 (46 Stat. 925; 59 Stat. 16; 74
                                            30, 1951, is no longer authorized beginning on           333), described in subsection (b) is no longer          Stat. 481; 100 Stat. 4257), beginning at the ex-
                                            the date of enactment of this Act.                       authorized beginning on the date of enact-              isting railroad bascule bridge and extending
                                            SEC. 315. SAN FRANCISCO, CALIFORNIA, WATER-              ment of this Act.                                       approximately 1,000 linear feet upstream to
                                                        FRONT AREA.                                    (b) AREA DESCRIBED.—The area referred to              an existing salinity barrier and flood control
                                              (a) IN GENERAL.—Section 114 of the River               in subsection (a) is generally the portion be-          structure, is no longer authorized beginning
                                            and Harbor Act of 1968 (33 U.S.C. 59h) is                tween and around the 2 piers at the State               on the date of enactment of this Act.
                                            amended to read as follows:                              Pier in New London, specifically the area—              SEC. 323. JULIAN KEEN, JR. LOCK AND DAM,
                                            ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATER-              (1) beginning at a point N691263.78,                             MOORE HAVEN, FLORIDA.
                                                          FRONT AREA.                                E1181259.26;                                              (a) DESIGNATION.—The Moore Haven Lock
                                               ‘‘(a) AREA TO BE DECLARED NONNAV-                       (2) running N 35°01’50.75’’ W about 955.59            and Dam, Moore Haven, Florida, authorized
                                            IGABLE.—The following area is declared to be             feet to a point N692046.26, E1180710.74;                pursuant to the Act of August 30, 1935 (chap-
                                            nonnavigable waters of the United States:                  (3) running N 54°58’06.78’’ E about 100.00 feet       ter 831, 49 Stat. 1032), shall hereafter be
                                            All of that portion of the City and County of            to a point N692103.66, E1180792.62;                     known and designated as the ‘‘Julian Keen,
                                            San Francisco, California, lying shoreward of              (4) running S 35°01’50.75’’ E about 989.8 feet        Jr. Lock and Dam’’.
                                                                                                     to a point N691293.17, E1181360.78; and                   (b) REFERENCES.—Any reference in a law,
                                            a line beginning at the intersection of the
                                                                                                       (5) running S 73°51’15.45’’ W about 105.69            map, regulation, document, paper, or other
                                            southerly right of way line of Earl Street
                                                                                                     feet to the point described in paragraph (1).           record of the United States to the Lock and
                                            prolongation with the Pierhead United
                                                                                                                                                             Dam referred to in subsection (a) shall be
                                            States Government Pierhead line, the                     SEC. 319. WASHINGTON HARBOR, DISTRICT OF
                                                                                                                                                             deemed to be a reference to the ‘‘Julian
                                            Pierhead line as defined in the State of Cali-                      COLUMBIA.
                                                                                                                                                             Keen, Jr. Lock and Dam’’.
                                            fornia Harbor and Navigation Code Section                  Beginning on the date of enactment of this            SEC. 324. TAYLOR CREEK RESERVOIR AND LEVEE
                                            1770, as amended in 1961; thence northerly               Act, the project for navigation, Washington                         L–73 (SECTION 1), UPPER ST. JOHNS
                                            along said Pierhead line to its intersection             Harbor, District of Columbia, authorized by                         RIVER BASIN, FLORIDA.
                                            with a line parallel with and distant 10 feet            the Act of August 30, 1935 (chapter 831, 49               The portions of the project for flood con-
                                            easterly from, the existing easterly bound-              Stat. 1031), is modified to reduce, in part, the        trol and other purposes, Central and South-




dlhill on DSK120RN23PROD with HOUSE
                                            ary line of Pier 30–32; thence northerly along           authorized dimensions of the project, such              ern Florida, authorized by section 203 of the
                                            said parallel line and its northerly prolonga-           that the remaining authorized dimensions                Flood Control Act of 1948 (62 Stat. 1176), con-
                                            tion, to a point of intersection with a line             are as follows:                                         sisting of the Taylor Creek Reservoir and
                                            parallel with, and distant 10 feet northerly               (1) A 200 foot wide, 15 foot deep channel             Levee L–73, Section 1, within the Upper St.
                                            from, the existing northerly boundary of                 with a center line beginning at a point East            Johns River Basin, Florida, are no longer au-
                                            Pier 30–32; thence westerly along last said              1,317,064.30 and North 440,373.32, thence to a          thorized beginning on the date of enactment
                                            parallel line to its intersection with said              point East 1,316,474.30 and North 440,028.31,           of this Act.




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00061    Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3944                                              CONGRESSIONAL RECORD — HOUSE                                                              July 29, 2020
                                            SEC. 325. CALCASIEU RIVER AND PASS, LOU-                   (4) Each user of storage space, regardless of        336; 117 Stat. 1840) is amended to read as fol-
                                                       ISIANA.                                       source of water, shall pay for any increase in         lows:
                                              Not later than 120 days after the date of              costs attributable to storage of that user’s              ‘‘(23) SACRAMENTO AREA, CALIFORNIA.—
                                            enactment of this Act, the Secretary shall               water.                                                 $45,000,000 for regional water conservation,
                                            provide to the Committee on Transportation               SEC. 327. PAWCATUCK RIVER, LITTLE NARRA-               recycling, reliability, and resiliency projects
                                            and Infrastructure of the House of Rep-                             GANSETT BAY AND WATCH HILL                  in Placer, El Dorado, and Sacramento Coun-
                                            resentatives and the Committee on Environ-                          COVE, RHODE ISLAND AND CON-                 ties and the San Juan Suburban Water Dis-
                                            ment and Public Works of the Senate a re-                           NECTICUT.                                   trict, California.’’.
                                            port on plans to modify the Calcasieu River                Beginning on the date of enactment of this              (2) SOUTH PERRIS, CALIFORNIA.—Section
                                            and Pass Dredged Material Management                     Act, that portion of the project for naviga-           219(f)(52) of the Water Resources Develop-
                                            Plan and Supplemental Environmental Im-                  tion, Pawcatuck River, Little Narragansett             ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;
                                            pact Statement (December 16, 2010 DMMP/                  Bay and Watch Hill Cove, Rhode Island and              114 Stat. 2763A–220) is amended by striking
                                            SEIS) to allow for the expansion of Dredged              Connecticut, authorized by section 2 of the            ‘‘$25,000,000’’ and inserting ‘‘$50,000,000’’.
                                            Material Placement Facilities (DMPFs) 17,                Act of March 2, 1945 (chapter 19, 59 Stat. 13),           (3) MADISON AND ST. CLAIR COUNTIES, ILLI-
                                            19, 22, D, and E to the lakeside foreshore rock          consisting of a 10-foot deep, 16-acre anchor-          NOIS.—Section 219(f)(55) of the Water Re-
                                            boundaries during planned rehabilitation of              age area in Watch Hill Cove is no longer au-           sources Development Act of 1992 (106 Stat.
                                            these facilities.                                        thorized.                                              4835; 113 Stat. 335; 114 Stat. 2763A–221) is
                                            SEC. 326. SAN JUAN-CHAMA PROJECT; ABIQUIU                                                                       amended by striking ‘‘$10,000,000’’ and insert-
                                                                                                     SEC. 328. HARRIS COUNTY, TEXAS.
                                                        DAM, NEW MEXICO.
                                                                                                       Section 575 of the Water Resources Devel-            ing ‘‘$45,000,000’’.
                                              (a) ABIQUIU RESERVOIR.—Section 5(b) of
                                                                                                     opment Act of 1996 (110 Stat. 3789) is re-                (4) SOUTHERN AND EASTERN KENTUCKY.—
                                            Public Law 97–140 (43 U.S.C. 620a note) is
                                                                                                     pealed.                                                Section 531 of the Water Resources Develop-
                                            amended by striking ‘‘a total of two hundred
                                                                                                     SEC. 329. CAP SANTE WATERWAY, WASHINGTON.              ment Act of 1996 (110 Stat. 3773; 113 Stat. 348;
                                            thousand acre-feet of’’.
                                              (b) WATER STORAGE AT ABIQUIU DAM, NEW                    Beginning on the date of enactment of this           117 Stat. 142; 121 Stat. 1226) is amended—
                                            MEXICO.—Section 1 of Public Law 100–522 (43              Act, the project for navigation, Cap Sante                (A) in subsection (g), by inserting ‘‘Boyd,
                                            U.S.C. 620a note) is amended—                            Waterway and Navigation Channel, Skagit                Carter, Elliott, Lincoln,’’ after ‘‘Lee,’’; and
                                              (1) by striking ‘‘200,000 acre-feet of’’;              County, Washington, authorized by the Act                 (B) in subsection (h), by striking
                                              (2) by inserting ‘‘and San Juan-Chama                  of March 2, 1919 (chapter 95, 40 Stat. 1285), is       ‘‘$40,000,000’’ and inserting ‘‘$80,000,000’’.
                                            project’’ after ‘‘Rio Grande system’’; and               modified to deauthorize the portion of the                (5) DESOTO COUNTY, MISSISSIPPI.—Section
                                              (3) by striking ‘‘, in lieu of the water stor-         project consisting of an approximately                 219(f)(30) of the Water Resources Develop-
                                            age authorized by section 5 of Public Law 97–                                                                   ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;
                                                                                                     334,434 foot area of the Federal channel with-
                                            140, to the extent that contracting entities                                                                    114 Stat. 2763A–220; 119 Stat. 282; 119 Stat.
                                                                                                     in Anacortes Harbor inside and directly adja-
                                            under section 5 of Public Law 97–140 no                                                                         2257; 122 Stat. 1623) is amended by striking
                                                                                                     cent to the Federal breakwater and training
                                            longer require such storage’’.                                                                                  ‘‘$75,000,000’’ and inserting ‘‘$130,000,000’’.
                                                                                                     wall structure, starting at a point with co-
                                              (c) WATER STORAGE.—The Secretary shall—                                                                          (6) JACKSON COUNTY, MISSISSIPPI.—Section
                                                                                                     ordinates N557015.552, E1210819.619, thence
                                              (1) store up to elevation 6230.00 NGVD29 at                                                                   219(e)(1) of the Water Resources Development
                                                                                                     running S88 13’2.06’’E approximately 200 feet
                                            Abiquiu Dam, New Mexico, to the extent                                                                          Act of 1992 (106 Stat. 4835; 110 Stat. 3757; 113
                                                                                                     to a point with coordinates N557009.330,
                                            that the necessary real property interests                                                                      Stat. 1494; 121 Stat. 1258) is amended by
                                                                                                     E1211019.522, thence running S01 46’58.08’’W
                                            have been acquired by any entity requesting                                                                     striking       ‘‘$32,500,000’’   and      inserting
                                                                                                     approximately 578 feet to a point with co-
                                            such storage; and                                                                                               ‘‘$57,500,000’’.
                                                                                                     ordinates N556431.405, E1211001.534, thence               (7) ST. LOUIS, MISSOURI.—Section 219(f)(32)
                                              (2) amend the March 20, 1986, contract be-             running S49 49’50.23’’W approximately 69 feet
                                            tween the United States of America and the                                                                      of the Water Resources Development Act of
                                                                                                     to a point with coordinates N556387.076,               1992 (106 Stat. 4835; 113 Stat. 337; 121 Stat.
                                            Albuquerque Bernalillo County Water Util-                E1210949.002, thence running S51 53’0.25’’E ap-
                                            ity Authority (assigned by the City of Albu-                                                                    1233) is amended by striking ‘‘$35,000,000’’ and
                                                                                                     proximately 35 feet to a point with coordi-            inserting ‘‘$70,000,000’’.
                                            querque, New Mexico to the Albuquerque                   nates N556365.662, E1210976.316, thence run-
                                            Bernalillo County Water Utility Authority)                                                                         (8) MIDWEST CITY, OKLAHOMA.—Section
                                                                                                     ning S49 38’58.48’’W approximately 112 feet to         219(f)(231) of the Water Resources Develop-
                                            for water storage space in Abiquiu Reservoir             a    point   with    coordinates   N556292.989,
                                            to allow for storage by the Albuquerque                                                                         ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;
                                                                                                     E1210890.775, thence running N88 13’1.87’’W            121 Stat. 1266) is amended by striking
                                            Bernalillo County Water Utility Authority                approximately 109 feet to a point with co-
                                            of San Juan-Chama project water or native                                                                       ‘‘$2,000,000’’ and inserting ‘‘$5,000,000’’.
                                                                                                     ordinates N556296.367, E1210782.226, thence               (9) SOUTH CENTRAL PENNSYLVANIA.—Section
                                            Rio Grande system water up to elevation                  running S46 46’58.97’’W approximately 141
                                            6230.00 NGVD29.                                                                                                 313 of the Water Resources Development Act
                                                                                                     feet to a point with coordinates N556199.527,          of 1992 (106 Stat. 4845; 109 Stat. 407; 110 Stat.
                                              (d) STORAGE AGREEMENTS WITH USERS                      E1210679.164, thence running N88 13’1.77’’W
                                            OTHER THAN THE ALBUQUERQUE BERNALILLO                                                                           3723; 113 Stat. 310; 117 Stat. 142; 121 Stat. 1146)
                                                                                                     approximately 700 feet to a point with co-             is amended—
                                            COUNTY WATER UTILITY AUTHORITY.—The
                                                                                                     ordinates N556221.305, E1209979.502, thence               (A) in subsection (g)(1), by striking
                                            Secretary shall—
                                                                                                     running N01 46’58.08’’E approximately 250 feet         ‘‘$200,000,000’’ and inserting ‘‘$400,000,000’’;
                                              (1) retain or enter into new agreements
                                                                                                     to a point with coordinates N556471.184,               and
                                            with entities for a proportionate allocation
                                                                                                     E1209987.280, thence running S88 13’1.77’’E ap-           (B) in subsection (h)(2), by inserting ‘‘Bea-
                                            of 29,100 acre-feet of storage space pursuant
                                                                                                     proximately 815 feet to a point with coordi-           ver, Jefferson,’’ after ‘‘Washington,’’.
                                            to section 5 of Public Law 97–140; and
                                                                                                     nates N556445.828, E1210801.886, thence run-              (10) LAKES MARION AND MOULTRIE, SOUTH
                                              (2) amend or enter into new storage agree-
                                                                                                     ning N01 46’58.08’’E approximately 570 feet to         CAROLINA.—Section 219(f)(25) of the Water
                                            ments for storage of San Juan-Chama
                                                                                                     the point of origin.                                   Resources Development Act of 1992 (106 Stat.
                                            project water or native Rio Grande system
                                                                                                     SEC. 330. REGIONAL SEDIMENT MANAGEMENT.                4835; 113 Stat. 336; 114 Stat. 2763A–220; 117
                                            water up to the space allocated for each enti-
                                            ty’s proportionate share of San Juan-Chama                 The Secretary shall expedite the activities          Stat. 1838; 130 Stat. 1677; 132 Stat. 3818) is
                                            water.                                                   required to be carried out under section 204           amended by striking ‘‘$89,550,000’’ and insert-
                                              (e) OPERATIONS DOCUMENTS.—The Sec-                     of the Water Resources Development Act of              ing ‘‘$110,000,000’’.
                                            retary shall amend or revise any existing op-            1992 (33 U.S.C. 2326) regarding the use of im-            (11) EL PASO COUNTY, TEXAS.—Section
                                            erations documents, including the Water                  provement dredging of the Portsmouth Fed-              219(f)(269) of the Water Resources Develop-
                                            Control Manual or operations plan for                    eral navigation project in Portsmouth, New             ment Act of 1992 (106 Stat. 4835; 113 Stat. 336;
                                            Abiquiu Reservoir, as necessary to meet the              Hampshire, as a source of clean beach fill             121 Stat. 1268) is amended by striking
                                            requirements of this section.                            material to reinforce the stone revetment at           ‘‘$25,000,000’’ and inserting ‘‘$75,000,000’’.
                                              (f) LIMITATIONS.—In carrying out this sec-             Nantasket Beach, Hull, Massachusetts.                     (12) WESTERN RURAL WATER.—Section 595 of
                                            tion, the following limitations shall apply:             SEC. 331. ADDITIONAL ASSISTANCE FOR CRIT-              the Water Resources Development Act of
                                              (1) The storage of native Rio Grande sys-                         ICAL PROJECTS.                              1999 (113 Stat. 383; 117 Stat. 139; 117 Stat. 142;
                                            tem water shall be subject to the provisions               (a) CONSISTENCY WITH REPORTS.—Congress               117 Stat. 1836; 118 Stat. 440; 121 Stat. 1219; 123
                                            of the Rio Grande Compact and the resolu-                finds that the project modifications de-               Stat. 2851; 128 Stat. 1316; 130 Stat. 1681) is
                                            tions of the Rio Grande Compact Commis-                  scribed in this section are in accordance with         amended—
                                            sion.                                                    the reports submitted to Congress by the                  (A) by striking the section heading and in-
                                              (2) The storage of native Rio Grande sys-              Secretary under section 7001 of the Water              serting ‘‘WESTERN RURAL WATER.’’;
                                            tem water shall only be authorized to the ex-            Resources Reform and Development Act of                   (B) in subsection (b), by inserting ‘‘Ari-
                                            tent that the necessary water ownership and              2014 (33 U.S.C. 2282d), titled ‘‘Report to Con-        zona,’’ before ‘‘rural Idaho’’;




dlhill on DSK120RN23PROD with HOUSE
                                            storage rights have been acquired by the en-             gress on Future Water Resources Develop-                  (C) in subsection (c), by inserting ‘‘Ari-
                                            tity requesting such storage.                            ment’’, or have otherwise been reviewed by             zona,’’ before ‘‘Idaho’’; and
                                              (3) The storage of native Rio Grande sys-              Congress.                                                 (D) in subsection (i), by striking ‘‘for the
                                            tem water or San-Juan Chama project water                  (b) MODIFICATIONS.—                                  period beginning with fiscal year 2001,
                                            shall not interfere with the authorized pur-               (1) SACRAMENTO AREA, CALIFORNIA.—Sec-                $435,000,000, to remain available until ex-
                                            poses of the Abiquiu Dam and Reservoir                   tion 219(f)(23) of the Water Resources Devel-          pended.’’ and inserting the following: ‘‘, to
                                            project.                                                 opment Act of 1992 (106 Stat. 4835; 113 Stat.          remain available until expended—




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00062   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                       H3945
                                               ‘‘(1) for the period beginning with fiscal            tion of the project for flood damage reduc-              (b) EUFAULA, ALABAMA.—
                                            year 2001, $435,000,000 for Idaho, Montana,              tion and environmental restoration, Muddy                (1) CONVEYANCE AUTHORIZED.—The Sec-
                                            rural Nevada, New Mexico, rural Utah, and                River, Brookline and Boston, Massachusetts,            retary shall convey to the City of Eufaula,
                                            Wyoming; and                                             authorized by section 522 of the Water Re-             Alabama, all right, title, and interest of the
                                               ‘‘(2) $150,000,000 for Arizona.’’.                    sources Development Act of 2000 (114 Stat.             United States in and to the real property de-
                                               (13) CENTRAL WEST VIRGINIA.—Section                   2656), and deauthorized pursuant to section            scribed in the Department of the Army Lease
                                            571(h) of the Water Resources Development                6001 of the Water Resources Reform and De-             No. DACW01–2–17–0747, containing 56.76 acres,
                                            Act of 1999 (113 Stat. 371; 121 Stat. 1257) is           velopment Act of 2014 (128 Stat. 1345), are au-        more or less, and being a part of Tracts L–
                                            amended by striking ‘‘$20,000,000’’ and insert-          thorized to be carried out by the Secretary,           1268 (26.12 acres), L–1273 (13.71 acres), L–1278
                                            ing ‘‘$40,000,000’’.                                     subject to subsection (b).                             (6.75 acres), and L1279 (10.36 acres) of the
                                               (14) SOUTHERN WEST VIRGINIA.—Section                    (2) EAST CHESTER CREEK, NEW YORK.—Not-               Walter F. George Lock and Dam and Lake
                                            340(g) of the Water Resources Development                withstanding section 1001 of the Water Re-             project.
                                            Act of 1992 (106 Stat. 4856; 110 Stat. 3727; 113         sources Development Act of 1986 (33 U.S.C.               (2) DEED.—The Secretary shall convey the
                                            Stat.      320)    is   amended       by  striking       579a), the project for navigation, East Ches-          property under this subsection by quitclaim
                                            ‘‘$40,000,000’’ and inserting ‘‘$120,000,000’’.          ter Creek, New York, authorized by section             deed under such terms and conditions as the
                                               (c) LOWELL CREEK TUNNEL, SEWARD, ALAS-                101 of the River and Harbor Act of 1950 (64            Secretary determines appropriate to protect
                                            KA.—Section 5032(a)(2) of the Water Re-                  Stat. 164; 100 Stat. 4181), and deauthorized           the interests of the United States.
                                            sources Development Act of 2007 (Public Law              pursuant to section 1001 of the Water Re-                (3) CONSIDERATION.—The City of Eufaula,
                                            110–114, 121 Stat. 1205) is amended by striking          sources Development Act of 1986 (33 U.S.C.             Alabama, shall pay to the Secretary an
                                            ‘‘15’’ and inserting ‘‘20’’.                             579(a)), is authorized to be carried out by the        amount that is not less than the fair market
                                            SEC. 332. PROJECT MODIFICATION AUTHORIZA-                Secretary, subject to subsection (b).                  value of the property conveyed under this
                                                        TIONS.                                         (3) CHRISTIANSTED HARBOR, UNITED STATES              subsection, as determined by the Secretary.
                                              (a) WATER SUPPLY.—The following project                VIRGIN ISLANDS.—Notwithstanding section
                                                                                                                                                              (c) MONTGOMERY, ALABAMA.—
                                            modifications for water supply, as identified            1002 of the Water Resources Development                  (1) CONVEYANCE AUTHORIZED.—The Sec-
                                            in the report entitled ‘‘Report to Congress on           Act of 1986 (100 Stat. 4221), the portion of the       retary shall convey to the City of Mont-
                                            Future Water Resources Development’’ dated               project for navigation, Christiansted Harbor,          gomery, Alabama, all right, title, and inter-
                                            February 2019, and submitted to Congress on              St. Croix, United States Virgin Islands, au-           est of the United States in and to the real
                                            June 3, 2019, pursuant to section 7001 of the            thorized by section 101 of the River and Har-          property described in paragraph (2).
                                            Water Resources Reform and Development                                                                            (2) PROPERTY.—The property to be con-
                                                                                                     bor Act of 1950 (64 Stat. 167), and deauthor-
                                            Act of 2014 (33 U.S.C. 2282d) or otherwise re-                                                                  veyed is the 62.38 acres of land and water
                                                                                                     ized under section 1002 of the Water Re-
                                            viewed by Congress, are authorized to be car-                                                                   under the primary jurisdiction of the Sec-
                                                                                                     sources Development Act of 1986 (100 Stat.
                                            ried out by the Secretary substantially in                                                                      retary in the R.E. ‘‘Bob’’ Woodruff Project
                                                                                                     4221), is authorized to be carried out by the
                                            accordance with the recommendations, in-                                                                        Area that is covered by lease number
                                                                                                     Secretary, subject to subsection (b).
                                            cluded in such report pursuant to section                                                                       DACW01–1–05–0037, including the parcels and
                                                                                                       (4) CHARLOTTE HARBOR, UNITED STATES VIR-
                                            301(c) of the Water Supply Act of 1958 (43                                                                      structure known as ‘‘Powder Magazine’’.
                                                                                                     GIN ISLANDS.—Notwithstanding section 1002
                                            U.S.C. 390b(c)):                                                                                                  (3) DEED.—The Secretary shall convey the
                                                                                                     of the Water Resources Development Act of
                                              (1) The project modification for the State                                                                    property under this subsection by quitclaim
                                                                                                     1986 (100 Stat. 4221), the portion of the
                                            of Missouri, Clarence Cannon Dam and Mark                                                                       deed under such terms and conditions as the
                                                                                                     project for navigation, Charlotte Amalie (St.
                                            Twain Lake Project Salt River, Missouri.                                                                        Secretary determines appropriate to protect
                                                                                                     Thomas) Harbor, St. Thomas, United States
                                              (2) The project modification for the City of                                                                  the interests of the United States, to include
                                                                                                     Virgin Islands, authorized by the Act of Au-
                                            Plattsburg, Smithville Lake, Missouri.                                                                          retaining the right to inundate with water
                                                                                                     gust 26, 1937 (chapter 832, 50 Stat. 850), and
                                              (3) The project modification for the City of                                                                  any land transferred under this subsection.
                                                                                                     deauthorized under section 1002 of the Water
                                            Smithville, Smithville Lake, Missouri.                                                                            (4) CONSIDERATION.—The City of Mont-
                                              (b) FLOOD RISK MANAGEMENT.—The fol-                    Resources Development Act of 1986 (100 Stat.
                                                                                                                                                            gomery, Alabama, shall pay to the Secretary
                                            lowing project modifications for flood risk              4221), is authorized to be carried out by the
                                                                                                                                                            an amount that is not less than the fair mar-
                                            management, as identified in a report enti-              Secretary, subject to subsection (b).
                                                                                                                                                            ket value of the property conveyed under
                                            tled ‘‘Report to Congress on Future Water                  (b) REPORT TO CONGRESS.—The Secretary
                                                                                                                                                            this subsection, as determined by the Sec-
                                            Resources Development’’, and submitted to                shall complete and submit to the Committee
                                                                                                                                                            retary.
                                            Congress pursuant to section 7001 of the                 on Transportation and Infrastructure of the              (d) OHIO RIVER LOCK AND DAM NUMBER 52,
                                            Water Resources Reform and Development                   House of Representatives and the Committee             MASSAC COUNTY, ILLINOIS.—
                                            Act of 2014 (33 U.S.C. 2282d) or otherwise re-           on Environment and Public Works of the                   (1) CONVEYANCE AUTHORIZED.—The Sec-
                                            viewed by Congress, are authorized to be car-            Senate a post-authorization change report              retary shall convey to the Massac-Metropolis
                                            ried out by the Secretary:                               (as such term is defined in section 1132(d) of         Port District, Illinois, all right, title, and in-
                                              (1) Modification of the project for flood              the Water Resources Development Act of                 terest of the United States in and to any real
                                            risk management, lower Mississippi River,                2016 (33 U.S.C. 2282e(d)) prior to carrying out        property located north of the south bank of
                                            authorized by the Act of May 15, 1928 (chap-             a project identified in subsection (a).                the Ohio River in Massac County, Illinois,
                                            ter 569, 45 Stat. 534), to incorporate the Wolf          SEC. 335. CONVEYANCES.                                 that is associated with the Ohio River Lock
                                            River Backwater and Nonconnah Creek levee                  (a) GENERALLY APPLICABLE PROVISIONS.—                and Dam 52.
                                            systems into the project, authorized by sec-               (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—               (2) DEED.—The Secretary shall convey the
                                            tion 5 of the Act of June 22, 1936 (chapter 688,         The exact acreage and the legal description            property under this subsection by quitclaim
                                            49 Stat. 1575; 50 Stat. 881), subject to the de-         of any real property to be conveyed under              deed under such terms and conditions as the
                                            termination of the Secretary that such sys-              this section shall be determined by a survey           Secretary determines appropriate to protect
                                            tems meet all requirements applicable to                 that is satisfactory to the Secretary.                 the interests of the United States.
                                            such project.                                              (2) APPLICABILITY OF PROPERTY SCREENING                (3) CONSIDERATION.—The Massac-Metropo-
                                              (2) Modification of the project for flood              PROVISIONS.—Section 2696 of title 10, United           lis Port District, Illinois, shall pay to the
                                            risk management, Red River below Denison                 States Code, shall not apply to any convey-            Secretary an amount that is not less than
                                            Dam, Arkansas, Louisiana, and Texas, au-                 ance under this section.                               fair market value of the property conveyed
                                            thorized by the Act of June 28, 1938 (chapter              (3) COSTS OF CONVEYANCE.—An entity to                under this subsection, as determined by the
                                            795, 52 Stat. 1219), to incorporate the Cher-            which a conveyance is made under this sec-             Secretary.
                                            okee Park Levee into the project, subject to             tion shall be responsible for all reasonable             (e) CLINTON, MISSOURI.—
                                            the determination of the Secretary that such             and necessary costs, including real estate               (1) CONVEYANCE AUTHORIZED.—The Sec-
                                            levee meets all requirements applicable to               transaction and environmental documenta-               retary shall convey to the City of Clinton,
                                            such project.                                            tion costs, associated with the conveyance.            Missouri, without consideration, all right,
                                            SEC. 333. APPLICATION OF CREDIT.                           (4) LIABILITY.—An entity to which a con-             title, and interest of the United States in
                                              Section 7007(d) of the Water Resources De-             veyance is made under this section shall hold          and to the real property described in para-
                                            velopment Act of 2007 (121 Stat. 1277; 128               the United States harmless from any liabil-            graph (2).
                                            Stat. 1226) is amended by inserting ‘‘, or may           ity with respect to activities carried out, on           (4) PROPERTY.—The property to be con-
                                            be applied to reduce the amounts required to             or after the date of the conveyance, on the            veyed is a tract of land situated in the S 1⁄2
                                            be paid by the non-Federal interest under                real property conveyed. The United States              of Section 12 and the N 1⁄2 of Section 13,
                                            the terms of the deferred payment agree-                 shall remain responsible for any liability             Township 41 North, Range 26 West of the
                                            ments entered into between the Secretary                 with respect to activities carried out, before         Fifth Principal Meridian, Henry County,




dlhill on DSK120RN23PROD with HOUSE
                                            and the non-Federal interest for the projects            such date, on the real property conveyed.              Missouri, more particularly described as fol-
                                            authorized by section 7012(a)(1)’’ before the              (5) ADDITIONAL TERMS AND CONDITIONS.—                lows: Beginning at the point of intersection
                                            period at the end.                                       The Secretary may require that any convey-             of the north line of said S 1⁄2 of Section 12
                                            SEC. 334. PROJECT REAUTHORIZATIONS.                      ance under this section be subject to such             and the easterly right-of-way of State High-
                                              (a) IN GENERAL.—                                       additional terms and conditions as the Sec-            way No. 13; thence easterly along the north
                                              (1) MUDDY RIVER, MASSACHUSETTS.—The                    retary considers necessary and appropriate             line of said S 1⁄2 to the northeast corner of
                                            separable elements for ecosystem restora-                to protect the interests of the United States.         the W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 of said Section




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00063   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3946                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                            12; thence southerly along the east line of              United States in and to the real property de-          access to the conveyed property for as long
                                            said W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 to the southeast         scribed in paragraph (2).                              as the non-Federal entity is in legal posses-
                                            corner thereof; thence easterly along the                  (2) PROPERTY.—The property to be con-                sion of the conveyed property.
                                            north line of the S 1⁄2 NE 1⁄4 SW 1⁄4 of said Sec-       veyed is Lot 28 in Old Orchard Addition, a               (3) DESCRIPTIONS OF PROPERTY.—
                                            tion 12 to the southwest corner of the W 1⁄2             subdivision of the City of Clinton, Henry                (A) IN GENERAL.—The property referred to
                                            NW 1⁄4 NW 1⁄4 SE 1⁄4 of said Section 12; thence          County, Missouri, containing 0.36 acres,               in paragraph (2)(A) is the following (as in ex-
                                            in a northeasterly direction to the northeast            more or less, including any improvements               istence on the date of enactment of this
                                            corner of said W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 ;              thereon.                                               Act):
                                            thence easterly along the north line of said               (3) DEED.—The Secretary shall convey the               (i) JUDGE JOSEPH BARKER, JR., HOUSE.—The
                                            S 1⁄2 to the westerly right-of-way of the                property under this subsection by quitclaim            tract of land situated in the State of Ohio,
                                            County Road; thence in a southeasterly and               deed under such terms and conditions as the            Washington County, on the Ohio River, and
                                            southerly direction along the westerly right-            Secretary determines appropriate to protect            being particularly bounded and described as
                                            of-way of said County Road approximately                 the interests of the United States, including          follows: Beginning at a point located on the
                                            2500 feet to the center of Deer Creek; thence            such reservations, terms, and conditions as            southern right-of-way line of Ohio Route 7, a
                                            in a southwesterly direction along the center            the Secretary determines necessary to allow            new corner to the land now or formerly
                                            of said Deer Creek, approximately 3900 feet              the United States to operate and maintain              owned by the United States of America;
                                            to the south line of said N 1⁄2 of Section 13;           the Harry S. Truman Reservoir Project.                 thence, leaving the right-of-way of said
                                            thence westerly along the south line of said               (4) CONSIDERATION.—The City of Clinton,              Route 7 and severing the land of said United
                                            N 1⁄2 to the easterly right-of-way line of the           Missouri, shall pay to the Secretary an                States of America parallel to and approxi-
                                            St. Louis-San Francisco Railroad; thence in              amount that is not less than the fair market           mately 10 feet easterly of the toe of the ex-
                                            a northwesterly direction along the easterly             value of the property conveyed under this              isting dredge disposal berm, southeasterly
                                            right-of-way of said railroad to the easterly            subsection, as determined by the Secretary.            approximately 326 feet to a point prior to the
                                            right-of-way of said State Highway No. 13;                 (g) TRI-COUNTY LEVEE DISTRICT, MIS-                  current Corps of Engineers access to the
                                                                                                     SOURI.—                                                dredging spoil area; thence, northeasterly
                                            thence in a northeasterly direction along the
                                            easterly right-of-way of said State Highway                (1) CONVEYANCE AUTHORIZED.—The Sec-                  approximately 480 feet paralleling the top of
                                            No. 13 to the point of the beginning; and in-            retary shall convey to the Tri-County Levee            the slope to the riverbank side of the house
                                            cluding a roadway easement for ingress and               District, Missouri, all right, title, and inter-       and approximately 25 feet northerly there-
                                            egress, described as a strip of land 80 feet in          est of the United States in and to the real            from; thence, northwest approximately 302
                                                                                                     property described in paragraph (2).                   feet to a point in the southern right-of-way
                                            width, lying 40 feet on each side of the fol-
                                                                                                       (2) PROPERTY.—The property to be con-                of Ohio Route 7; thence with the right-of-
                                            lowing described line, the initial extremities
                                                                                                     veyed is the part of Sections 1 and 12 Town-           way of said Route 7, southwesterly approxi-
                                            of the following described strip being ex-
                                                                                                     ship 45 North Range 6 West of the 5th P.M. in          mately 485 feet to the point of beginning,
                                            tended or reduced as required to exactly ad-
                                                                                                     Montgomery County, Missouri, described as              containing approximately 3.51 acres.
                                            join the boundary lines which they meet, sit-
                                                                                                     follows: A tract of land being 60’ wide and              (ii) ROAD TRACT.—The tract of land situ-
                                            uated in the S 1⁄2 of Section 12, Township 41
                                                                                                     lying South and East of and adjoining the              ated in the State of Ohio, Washington Coun-
                                            North Range 26 West of the Fifth Principal
                                                                                                     centerline of the existing levee and being de-         ty, on the Ohio River, and being particularly
                                            Meridian, Henry County, Missouri, more par-
                                                                                                     scribed as follows: Commencing at the NW               bounded and described as follows: Beginning
                                            ticularly described as follows: Commencing
                                                                                                     corner of Section 12, thence S 87° 52’ 35’’ E          at a point located on the southern right-of-
                                            at the center of said Section 12, thence                 587.4’, thence S 01° 29’ 25’’ W 453.68’ to the         way line of Ohio Route 7, a new corner to the
                                            Sl°24’56’’W, 1265.52 feet to a point, thence             point of the beginning; said point being in            land now or formerly owned by the United
                                            N88°29’02’’W, 483.97 feet to the point of begin-         the center of the levee, thence with the cen-          States of America; thence, leaving the right-
                                            ning of the strip of land herein described;              terline of the levee N 77° 01’ 30’’ E 164.92’,         of-way of said Route 7 and severing the land
                                            thence in a northeasterly direction along a              thence N 74° 26’ 55’’ E 250.0’, thence N 72° 27’       of said United States of America and with
                                            curve to the right, said curve having an ini-            55’’ E 270.0’, thence N 69° 06’ 10’’ E 300.0’,         the House Parcel southeasterly 25 feet;
                                            tial tangent bearing of N3°44’4l’’E, a radius of         thence N 66° 42’ 15’’ E 500.0’, thence N 64° 14’       thence, northeast, running parallel to said
                                            238.73 feet and an interior angle of 61°29’26’’,         30’’ E 270.0’, thence N 61° 09’ 10’’ E 800.0’,         Route 7 right-of-way, approximately 994 feet
                                            an arc distance of 256.21 feet to a point;               thence N 60° 58’ 15’’ E 1724.45’, thence leaving       to a point of deflection; thence northeasterly
                                            thence N65°14’07’’E 218.58 feet to a point;              the centerline S 01° 10’ 35’’ W 69.43’, thence         368 feet to a point beyond the existing fence
                                            thence in a northeasterly direction along a              parallel with the above described centerline           corner; thence, east 140 feet to the edge of
                                            curve to the left, having a radius of 674.07             S 60° 58’ 15’’ W 1689.62’, thence S 61° 09’ 10’’ W     the existing Willow Island access road;
                                            feet and an interior angle of 36°00’01’’, an arc         801.71’, thence S 64° 14’ 30’’ W 272.91’, thence       thence with said access road, northwesterly
                                            distance of 423.53 feet to a point; thence               S 66° 42’ 15’’ W 502.55’, thence S 69° 06’ 10’’ W      approximately 62 feet to a point in the
                                            N29°14’07’’E, 417.87 feet to a point; thence             303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S      southern right-of-way of Ohio Route 7;
                                            northeasterly along a curve to the right,                74° 26’ 55’’ W 252.39’, thence S 77° 01’ 30’’ W        thence with the right-of-way of said Route 7,
                                            having a radius of 818.51 feet and an interior           181.75’, thence leaving the South side of the          southwesterly approximately 1,491 feet to
                                            angle of 14°30’01’’, an arc distance of 207.15           levee N 01° 26’ 25’’ E 61.96’ to the point of be-      the point of beginning, containing approxi-
                                            feet to a point; thence N43°44’07’’E, 57.00 feet         ginning and containing 5.89 acres more or              mately 1 acre.
                                            to the southerly right-of-way line of a coun-            less.                                                    (B) EASEMENT.—The property referred to in
                                            ty road, containing 2,948 acres, more or less;             (3) DEED.—The Secretary shall convey the             paragraph (2)(B) is the following: The tract
                                            Excluding therefrom a tract of land situated             property under this subsection by quitclaim            of land situated in the State of Ohio, Wash-
                                            in the S 1⁄2 of said Section 12, said Township           deed under such terms and conditions as the            ington County, on the Ohio River, and being
                                            and Range, described as commencing at the                Secretary determines appropriate to protect            particularly bounded and described as fol-
                                            center of said Section 12; thence S1°24’56’’W,           the interests of the United States.                    lows: Beginning at a point at the intersec-
                                            1265.52 feet to the point of beginning of the              (4) CONSIDERATION.—The Tri-County Levee              tion of the southern right-of-way of Ohio
                                            tract of land herein described; thence                   District, Missouri, shall pay to the Secretary         Route 7 and the northeast side of the exist-
                                            N88°29’02″W, 1122.50 feet; thence S1°43’26″W,            an amount that is not less than the fair mar-          ing Willow Island access road, a new corner
                                            872.62 feet; thence S88°29’02’’E, 1337.36 feet;          ket value of the property conveyed under               to the land now or formerly owned by the
                                            thence     Nl°43’26’’E,   872.62   feet;   thence        this subsection, as determined by the Sec-             United States of America; thence, southwest,
                                            N88°29’02’’W, 214.86 feet to the point of begin-         retary.                                                running with said Route 7 right-of-way, ap-
                                            ning, containing 26.79 acres, more or less.                (h) JUDGE JOSEPH BARKER, JR., HOUSE,                 proximately 30 feet to a point on the south-
                                            The above described tract contains, in the               OHIO.—                                                 west side of the existing access road, and
                                            aggregate, 177.69 acres, more or less.                     (1) NON-FEDERAL ENTITY.—In this sub-                 corner to the road tract; thence with said ac-
                                              (2) DEED.—The Secretary shall convey the               section, the term ‘‘non-Federal entity’’               cess road and the line of the road parcel,
                                            property under this subsection by quitclaim              means the Friends of Joseph Barker, Jr.,               southeasterly approximately 62 feet to a
                                            deed under such terms and conditions as the              House, a nonprofit organization in the State           point; thence leaving the road parcel and
                                            Secretary determines appropriate to protect              of Ohio.                                               crossing the existing access road northeast-
                                            the interests of the United States.                        (2) CONVEYANCE AUTHORIZED.—                          erly approximately 30 feet to a point located
                                              (3) REVERSION.—If the Secretary deter-                   (A) IN GENERAL.—Subject to paragraph (6),            on the northeast side of the existing access
                                            mines that the property conveyed under this              the Secretary shall convey to the non-Fed-             road; thence, northwesterly approximately
                                            subsection is not being used for a public pur-           eral entity, without consideration, all right,         62 feet, to the point of beginning, containing
                                            pose, all right, title, and interest in and to           title, and interest of the United States in            approximately 0.04 acre.
                                            the property shall revert, at the discretion of




dlhill on DSK120RN23PROD with HOUSE
                                                                                                     and to the property described in paragraph               (4) DEED.—The Secretary shall convey the
                                            the Secretary, to the United States.                     (3)(A).                                                property under this subsection by quitclaim
                                              (f) CITY OF CLINTON, OLD ORCHARD ADDI-                   (B) EASEMENT.—Upon conveyance of the                 deed under such terms and conditions as the
                                            TION, MISSOURI.—                                         property under subparagraph (A), the Sec-              Secretary determines appropriate to protect
                                              (1) CONVEYANCE AUTHORIZED.—The Sec-                    retary shall provide to the non-Federal enti-          the interests of the United States.
                                            retary shall convey to the City of Clinton,              ty, without consideration, an easement over              (5) REVERSION.—If the Secretary deter-
                                            Missouri, all right, title, and interest of the          the property described in paragraph (3)(B) for         mines that the property conveyed under this




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00064   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                     H3947
                                            subsection is not being used by the non-Fed-             right, title, and interest of the United States        rights-of-way, and leases that are in effect as
                                            eral entity for a public purpose, all right,             in and to the real property comprising the             of the date of the conveyance.
                                            title, and interest in and to the property               Leaburg Fish Hatchery, consisting of ap-                 (5) REVERSION.—If the Secretary deter-
                                            shall revert, at the discretion of the Sec-              proximately 21.55 acres, identified as tracts          mines that the property conveyed under this
                                            retary, to the United States.                            Q–1500, Q–1501E, and 300E–1 and described in           subsection cease to be held in public owner-
                                               (6) REQUIREMENTS.—                                    Department of the Army Lease No. DACW57–               ship, all right, title, and interest in and to
                                               (A) IMPROVEMENTS.—The Secretary shall                 1–18–0009, together with any improvements              the property shall revert, at the discretion of
                                            make such improvements and alterations to                on the property.                                       the Secretary, to the United States.
                                            the property described in paragraph (3)(A)(i)               (2) WATER RIGHTS.—The Secretary may                   (6) REQUIREMENTS BEFORE CONVEYANCE.—
                                            as the Secretary, in consultation with the               transfer to the State of Oregon, acting                  (A) PERPETUAL ROAD EASEMENT.—Before
                                            non-Federal entity and relevant stake-                   through the Oregon Department of Fish and              making the conveyance under paragraph (2),
                                            holders, determines to be appropriate to fa-             Wildlife, any water rights held by the United          the Secretary shall acquire a perpetual road
                                            cilitate conveyance of the property and pro-             States that are appurtenant to the property            easement from an adjacent property owner
                                            vision of the easement under this subsection,            conveyed under this subsection.                        for use of an access road, which easement
                                            subject to the condition that the total cost                (3) DEED.—The Secretary shall convey the            shall convey with the property conveyed
                                            of those improvements and alterations un-                property under this subsection by quitclaim            under such paragraph.
                                            dertaken by the Secretary shall be not more              deed under such terms and conditions as the              (B) ENVIRONMENTAL COMPLIANCE.—Before
                                            than $120,000.                                           Secretary determines appropriate to protect            making the conveyance under paragraph (2),
                                               (B) ENVIRONMENTAL ASSESSMENT.—Before                  the interests of the United States, including          in accordance with the real estate appendix,
                                            making a conveyance under paragraph (2),                 a condition that all of the property conveyed          the Secretary shall complete a Phase 1 Envi-
                                            the Secretary shall—                                     under this subsection be used and main-                ronmental Site Assessment pursuant to the
                                               (i) conduct, with respect to the property to          tained by the State of Oregon for the purpose          Comprehensive Environmental Response,
                                            be conveyed, an assessment of the environ-               of operating a fish hatchery in perpetuity.            Compensation, and Liability Act of 1980 (42
                                            mental condition of the property, including                 (4) REVERSION.—If the Secretary deter-              U.S.C. 9601 et seq.).
                                            an investigation of any potential hazardous,             mines that the property conveyed under this              (C) HISTORIC PRESERVATION.—The Sec-
                                            toxic, or radioactive waste present on such              subsection is not being used or maintained             retary may enter into a memorandum of
                                            property; and                                            by the State of Oregon for the purpose of op-          agreement with the Oregon State Historic
                                               (ii) submit to the non-Federal entity a re-           erating a fish hatchery in perpetuity, all or          Preservation Office and the Advisory Council
                                            port describing the results of such assess-              any portion of the property, including any             on Historic Preservation that identifies ac-
                                            ment.                                                    water rights transferred under this sub-               tions the Secretary shall take before making
                                               (C) REFUSAL BY NON-FEDERAL ENTITY.—                   section, shall, at the option of the Secretary,        the conveyance under paragraph (2).
                                               (i) IN GENERAL.—Upon review by the non-               revert to the United States.                             (D) REPAIRS.—Before making the convey-
                                            Federal entity of the report under subpara-                 (5) SAVINGS CLAUSE.—If the State of Oregon          ance under paragraph (2), the Secretary shall
                                            graph (B), the non-Federal entity may elect              does not accept the conveyance under this              carry out repairs to address primary seismic
                                            to refuse the conveyance under this sub-                 subsection, the Secretary may dispose of the           and safety risks in accordance with the rec-
                                            section.                                                 property,     including   appurtenant     water
                                                                                                                                                            ommendations approved in the Willamette
                                               (ii) ELECTION.—An election under clause               rights, under subchapter III of chapter 5 of
                                                                                                                                                            Falls Locks report.
                                            (i)—                                                     title 40, United States Code.
                                                                                                        (j) WILLAMETTE FALLS LOCKS, WILLAMETTE                (7) DEAUTHORIZATION.—Beginning on the
                                               (I) shall be at the sole discretion of the
                                                                                                     RIVER, OREGON.—                                        date on which the Secretary makes the con-
                                            non-Federal entity; and
                                                                                                        (1) DEFINITIONS.—In this section:                   veyance under paragraph (2), the Willamette
                                               (II) shall be made by the non-Federal enti-
                                                                                                        (A) REAL ESTATE APPENDIX.—The term                  Falls Locks project is no longer authorized.
                                            ty by not later than the date that is 30 days
                                            after the date of submission of the report               ‘‘real estate appendix’’ means Appendix A of           SEC. 336. REPEALS.
                                            under subparagraph (B)(ii).                              the document published by the District Com-              (a) Section 710 of the Water Resources De-
                                               (D) DREDGED MATERIAL PLACEMENT ACTIVI-                mander of the Portland District of the Corps           velopment Act of 1986 (33 U.S.C. 2264) is re-
                                            TIES.—The Secretary shall—                               of Engineers, titled ‘‘Willamette Falls Locks          pealed.
                                               (i) notify and coordinate with the non-Fed-           Willamette River Oregon Section 216 Dis-                 (b) Section 1001 of the Water Resources De-
                                            eral entity and relevant stakeholders before             position Study with Integrated Environ-                velopment Act of 1986 (33 U.S.C. 579a) is
                                            carrying out any dredged material place-                 mental Assessment’’.                                   amended—
                                            ment activities associated with the property                (B) RECEIVING ENTITY.—The term ‘‘receiv-              (1) in subsection (b), by striking paragraph
                                            described in paragraph (3)(A) after the date             ing entity’’ means an entity identified by the         (2) and redesignating paragraph (3) as para-
                                            on which such property is conveyed under                 State of Oregon, in consultation with the              graph (2); and
                                            this subsection; and                                     Willamette Falls Locks Commission, to re-                (2) by striking subsection (c).
                                               (ii) in carrying out a dredged material               ceive the conveyance under paragraph (2).                (c) Section 1001 of the Water Resources Re-
                                            placement activity under clause (i), act in                 (C) WILLAMETTE FALLS LOCKS PROJECT.—                form and Development Act of 2014 (33 U.S.C.
                                            accordance with Engineer Manual EM 1110–2–               The term ‘‘Willamette Falls Locks project’’            2282c) is amended—
                                            5025 (or a subsequent version of that man-               means the project for navigation, Willamette             (1) in subsection (d)—
                                            ual).                                                    Falls Locks, Willamette River, Oregon, au-               (A) in paragraph (1), by striking ‘‘Notwith-
                                               (7) RESERVATION OF RIGHTS.—The Secretary              thorized by the Act of June 25, 1910 (36 Stat.         standing the requirements of subsection (c),
                                            may reserve and retain from any conveyance               664, chapter 382).                                     the Secretary’’ and inserting ‘‘The Sec-
                                            under this subsection a right-of-way or any                 (D) WILLAMETTE FALLS LOCKS REPORT.—The              retary’’;
                                            other right that the Secretary determines to             term ‘‘Willamette Falls Locks report’’                   (B) by striking ‘‘subsections (a) and (c)’’
                                            be necessary for the operation and mainte-               means the memorandum of the Director of                each place it appears and inserting ‘‘sub-
                                            nance of the authorized Federal channel                  Civil Works with the subject ‘‘Willamette              section (a)’’; and
                                            along the Ohio River.                                    Falls Locks (WFL), Willamette River Oregon               (C) by striking paragraph (4); and
                                               (8) TREATMENT.—Conveyance to the non-                 Section 216 Disposition Study with Inte-                 (2) by striking subsection (c) and redesig-
                                            Federal entity under this subsection of prop-            grated Environmental Assessment (Study)’’,             nating subsections (d) through (g) as sub-
                                            erty described in paragraph (3)(A)(i) shall              dated July 11, 2019.                                   sections (c) through (f), respectively.
                                            satisfy all obligations of the Secretary with               (2) CONVEYANCE AUTHORIZED.—The Sec-                   (d) Section 6003 of the Water Resources Re-
                                            respect to such property under—                          retary is authorized to convey to the receiv-          form and Development Act of 2014 (33 U.S.C.
                                               (A) section 306101 of title 54, United States         ing entity, without consideration, all right,          579c), and the item relating to such section
                                            Code; and                                                title, and interest of the United States in            in the table of contents, are repealed.
                                               (B) section 306108 of title 54, United States         and to any land in which the Federal Gov-                (e) Section 1301 of the Water Resources De-
                                            Code, with respect to the effects on the prop-           ernment has a property interest for the Wil-           velopment Act of 2016 (33 U.S.C. 579d), and
                                            erty of dredged material placement activi-               lamette Falls Locks project, together with             the item relating to such section in the table
                                            ties carried out by the Secretary after the              any improvements on the land, subject to               of contents, are repealed.
                                            date of the conveyances.                                 the requirements of this subsection and in               (f) Section 1302 of the Water Resources De-
                                               (9) INAPPLICABILITY.—Subtitle I of title 40,          accordance with the Willamette Falls Locks             velopment Act of 2016 (33 U.S.C. 579c–1), and
                                            and chapter 4 of title 41, United States Code            report.                                                the item relating to such section in the table
                                            shall not apply to any conveyance or ease-                  (3) DEED.—The Secretary shall convey the            of contents, are repealed.
                                            ment provided under this subsection.                     property under this subsection by quitclaim              (g) Section 1301 of the Water Resources De-




dlhill on DSK120RN23PROD with HOUSE
                                               (i) LEABURG FISH HATCHERY, LANE COUNTY,               deed under such terms and conditions as the            velopment Act of 2018 (33 U.S.C. 579d–1), and
                                            OREGON.—                                                 Secretary determines appropriate to protect            the item relating to such section in the table
                                               (1) CONVEYANCE AUTHORIZED.—Subject to                 the interests of the United States.                    of contents, are repealed.
                                            the provisions of this subsection, the Sec-                 (4) SUBJECT TO EXISTING EASEMENTS AND                 (h) Section 1302 of the Water Resources De-
                                            retary shall convey, without consideration,              OTHER INTERESTS.—The conveyance of prop-               velopment Act of 2018 (33 U.S.C. 579c–2), and
                                            to the State of Oregon, acting through the               erty under paragraph (2) shall be subject to           the item relating to such section in the table
                                            Oregon Department of Fish and Wildlife, all              all existing deed reservations, easements,             of contents, are repealed.




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00065   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3948                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                                     TITLE IV—WATER RESOURCES                         poses, as identified in the reports titled ‘‘Re-      gress, are authorized to be carried out by the
                                                          INFRASTRUCTURE                              port to Congress on Future Water Resources            Secretary substantially in accordance with
                                                                                                      Development’’ submitted to Congress pursu-            the plans, and subject to the conditions, de-
                                            SEC. 401. PROJECT AUTHORIZATIONS.
                                                                                                      ant to section 7001 of the Water Resources            scribed in the respective reports or decision
                                              The following projects for water resources              Reform and Development Act of 2014 (33                documents designated in this section:
                                            development and conservation and other pur-               U.S.C. 2282d) or otherwise reviewed by Con-             (1) NAVIGATION.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             1. AK             Port of Nome Modifications                    May 29, 2020                     Federal: $368,173,000
                                                                                                                                              Non-Federal: $122,746,000
                                                                                                                                              Total: $490,919,000

                                             2. AK             Unalaska (Dutch Harbor) Channels              February 7, 2020                 Federal: $26,202,750
                                                                                                                                              Non-Federal: $8,734,250
                                                                                                                                              Total: $34,937,000

                                             3. CT             New Haven Harbor Navigation Im-               May 7, 2020                      Federal: $53,489,000
                                                                provement Project                                                             Non-Federal: $18,822,000
                                                                                                                                              Total: $72,311,000

                                             4. NY, NJ         New York and New Jersey Harbor                April 23, 2020                   Federal: $18,940,000
                                                                Anchorages                                                                    Non-Federal: $6,310,000
                                                                                                                                              Total: $25,250,000

                                             5. TX             Gulf Intracoastal Waterway, Brazos            October 23, 2019                 Total: $409,777,000, to be derived 1⁄2 from the general fund
                                                                River Floodgates and Colorado                                                  of the Treasury and 1⁄2 from the Inland Waterways
                                                                River Locks                                                                    Trust Fund.

                                             6. TX             Houston Ship Channel Expansion                April 23, 2020                   Federal: $462,803,000
                                                                Channel Improvement Project,                                                  Non-Federal: $414,045,000
                                                                Harris, Chambers, and Galveston                                               Total: $876,848,000
                                                                Counties

                                             7. TX             Matagorda Ship Channel Improve-               November 15, 2019                Federal: $138,660,000
                                                                ment Project, Port Lavaca                                                     Non-Federal: $79,664,000
                                                                                                                                              Total: $218,324,000


                                              (2) FLOOD RISK MANAGEMENT.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             1. AZ             Little Colorado River at Winslow,             December 14, 2018                Federal: $52,462,000
                                                                 Navajo County                                                                Non-Federal: $28,249,000
                                                                                                                                              Total: $80,711,000

                                             2. CA             Westminster, East Garden Grove,               July 9, 2020                     Federal: $314,506,000
                                                                California Flood Risk Manage-                                                 Non-Federal: $910,092,000
                                                                ment                                                                          Total: $1,224,598,000

                                             3. CT, NY         Westchester   County    Streams,              May 7, 2020                      Federal: $14,702,500
                                                                Byram River Basin, Fairfield                                                  Non-Federal: $14,702,500
                                                                County, Connecticut, and West-                                                Total: $29,405,000
                                                                chester County, New York

                                             4. ND             Souris River Basin             Flood   Risk   April 16, 2019                   Federal: $58,041,750
                                                                Management                                                                    Non-Federal: $31,253,250
                                                                                                                                              Total: $89,295,000

                                             5. NJ             Peckman River Basin                           April 29, 2020                   Federal: $95,022,000
                                                                                                                                              Non-Federal: $51,166,000
                                                                                                                                              Total: $146,188,000

                                             6. NM             Middle Rio Grande Flood Protec-               March 13, 2020                   Federal: $190,538,000
                                                                tion, Bernalillo to Belen                                                     Non-Federal: $102,598,000
                                                                                                                                              Total: $293,136,000

                                             7. OK             Tulsa and West-Tulsa Levee Sys-               April 23, 2020                   Federal: $86,780,000
                                                                tem, Tulsa County                                                             Non-Federal: $46,728,000
                                                                                                                                              Total: $133,508,000


                                              (3) HURRICANE AND STORM DAMAGE RISK RE-
                                            DUCTION.—




dlhill on DSK120RN23PROD with HOUSE


                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00066   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                             H3949
                                                                                                                         C.
                                                                                                                       Date of                                               D.
                                                                                    B.
                                                A. State                                                              Report of                                          Estimated
                                                                                   Name                                Chief of                                            Costs
                                                                                                                      Engineers

                                             1. DE             Delaware Beneficial Use of Dredged            March 6, 2020                    Initial Federal: $53,220,000
                                                                Material for the Delaware River                                               Initial Non-Federal: $28,660,000
                                                                                                                                              Total: $81,880,000
                                                                                                                                              Renourishment Federal: $116,380,000
                                                                                                                                              Renourishment Non-Federal: $116,380,000
                                                                                                                                              Renourishment Total: $232,760,000

                                             2. NJ             New Jersey Beneficial Use of                  April 8, 2020                    Initial Federal: $80,780,000
                                                                Dredged Material for the Dela-                                                Initial Non-Federal: $43,500,000
                                                                ware River                                                                    Total: $124,280,000
                                                                                                                                              Renourishment Federal: $82,140,000
                                                                                                                                              Renourishment Non-Federal: $82,140,000
                                                                                                                                              Renourishment Total: $164,280,000

                                             3. NJ             Rahway River Basin, New Jersey                June 9, 2020                     Federal: $46,754,000
                                                                Coastal Storm Risk Management                                                 Non-Federal: $25,175,000
                                                                                                                                              Total: $71,929,000

                                             4. NY             East Rockaway Inlet to Rockaway               August 22, 2019                  Initial Federal: $604,203,000
                                                                Inlet and Jamaica Bay, Atlantic                                               Initial Non-Federal: $0
                                                                Coast of New York                                                             Total: $604,203,000
                                                                                                                                              Renourishment Federal: $189,763,000
                                                                                                                                              Renourishment Non-Federal: $189,763,000
                                                                                                                                              Renourishment Total: $379,526,000

                                             5. NY             Hashamomuck Cove Coastal Storm                December 9, 2019                 Initial Federal: $11,549,000
                                                                Risk Management                                                               Initial Non-Federal: $6,218,000
                                                                                                                                              Total: $17,767,000
                                                                                                                                              Renourishment Federal: $23,481,500
                                                                                                                                              Renourishment Non-Federal: $23,481,500
                                                                                                                                              Renourishment Total: $46,963,000

                                             6. RI             Pawcatuck River Coastal Storm                 December 19, 2018                Federal: $37,848,000
                                                                Risk Management Project                                                       Non-Federal: $20,379,000
                                                                                                                                              Total: $58,227,000

                                             7. VA             Norfolk Coastal Storm Risk Man-               February 5, 2019                 Federal: $909,040,000
                                                                agement                                                                       Non-Federal: $489,480,000
                                                                                                                                              Total: $1,398,520,000


                                              (4) FLOOD RISK MANAGEMENT                AND    ECO-
                                            SYSTEM RESTORATION.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             1. CO             South Platte River and Tributaries,           July 29, 2019                    Federal: $334,412,000
                                                                Adams and Denver Counties                                                     Non-Federal: $200,406,000
                                                                                                                                              Total: $534,818,000

                                             2. NY             Fire Island Inlet to Montauk Point,           July 9, 2020                     Initial Federal: $1,541,981,000
                                                                 New York Reformulation                                                       Initial Non-Federal: $0
                                                                                                                                              Total: $1,541,981,000
                                                                                                                                              Renourishment Federal: $742,926,500
                                                                                                                                              Renourishment Non-Federal: $742,926,500
                                                                                                                                              Renourishment Total: $1,485,853,000


                                              (5) ECOSYSTEM RESTORATION.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             1. CA             Delta Islands and Levees                      December 18, 2018                Federal: $16,746,395
                                                                                                                                              Non-Federal: $9,016,736
                                                                                                                                              Total: $25,763,131

                                             2. CA             Yuba River Ecosystem Restoration              June 20, 2019                    Federal: $65,014,326
                                                                                                                                              Non-Federal: $35,008,268
                                                                                                                                              Total: $100,022,594




dlhill on DSK120RN23PROD with HOUSE
                                             3. FL             Comprehensive Everglades Restora-             April 8, 2020                    Federal: $372,232,000
                                                                tion Plan, Loxahatchee River Wa-                                              Non-Federal: $368,528,000
                                                                tershed Restoration Project, Mar-                                             Total: $740,760,000
                                                                tin and Palm Beach Counties




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00067   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3950                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             4. IL             The Great Lakes and Mississippi               May 23, 2019                     Federal: $690,643,200
                                                                River Interbasin Study - Brandon                                              Non-Federal: $172,660,800
                                                                Road, Will County                                                             Total: $863,304,000

                                             5. IL             South Fork of the South Branch of             July 9, 2020                     Federal: $11,657,000
                                                                the Chicago River, Bubbly Creek,                                              Non-Federal: $6,277,000
                                                                Ecosystem Restoration                                                         Total: $17,934,000

                                             6. MD             Anacostia Watershed Restoration,              December 19, 2018                Federal: $23,171,000
                                                                Prince George’s County                                                        Non-Federal: $12,476,000
                                                                                                                                              Total: $35,647,000

                                             7. MO             St. Louis Riverfront- Meramec                 November 1, 2019                 Federal: $60,124,000
                                                                 River Basin Ecosystem Restora-                                               Non-Federal: $32,375,000
                                                                 tion                                                                         Total: $92,499,000

                                             8. NM             Rio Grande, Environmental Man-                August 5, 2019                   Federal: $16,163,000
                                                                agement Program, Sandia Pueblo                                                Non-Federal: $8,703,000
                                                                to Isleta Pueblo, New Mexico                                                  Total: $24,866,000
                                                                Ecosystem Restoration

                                             9. NY, NJ         Hudson-Raritan Estuary Ecosystem              May 26, 2020                     Federal: $265,320,000
                                                                Restoration                                                                   Non-Federal: $142,864,000
                                                                                                                                              Total: $408,184,000

                                             10. TX            Jefferson County Ecosystem Res-               September 12, 2019               Federal: $37,615,000
                                                                 toration                                                                     Non-Federal: $20,254,000
                                                                                                                                              Total: $57,869,000


                                              (6) WATER SUPPLY.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                              Report of                                             Costs
                                                                                                                 Chief of Engineers

                                             1. OR             Willamette River Basin Review Re-             December 18, 2019                Federal: $0
                                                                allocation,                                                                   Non-Federal: $0
                                                                                                                                              Total: $0


                                              (7) MODIFICATIONS AND OTHER PROJECTS.—

                                                                                                                          C.                                                 D.
                                                                                    B.                                 Date of
                                                A. State                                                                                                                 Estimated
                                                                                   Name                                Decision                                            Costs
                                                                                                                      Document

                                             1. FL             Caloosahatchee River West Basin               July 24, 2020                    Federal: $503,466,500
                                                                Storage Reservoir (C-43 WBSR)                                                 Non-Federal: $503,466,500
                                                                                                                                              Total: $1,006,933,000

                                             2. KY             Kentucky Lock                                 June 9, 2020                     Total: $1,152,769,000 (to be derived 1⁄2 from the general
                                                                                                                                               fund of the Treasury and 1⁄2 from the Inland Waterways
                                                                                                                                               Trust Fund)

                                             3. NC             Carolina Beach Integrated Beach               June 16, 2020                    Federal: $24,205,000
                                                                Renourishment                                                                 Non-Federal: $24,205,000
                                                                                                                                              Total: $48,410,000

                                             4. NC             Wrightsville Beach                            July 2, 2020                     Federal: $53,788,000
                                                                                                                                              Non-Federal: $22,329,000
                                                                                                                                              Total: $76,117,000
                                                                                                                                              Renourishment Federal: $14,553,000
                                                                                                                                              Renourishment Non-Federal: $14,553,000
                                                                                                                                              Renourishment Total: $29,106,000

                                             5. TX             Corpus Christi Ship Channel, Deep-            May 4, 2020                      Federal: $403,000,000
                                                                ening and Widening and Barge                                                  Non-Federal: $273,010,000
                                                                Shelves                                                                       Total: $676,010,000


                                            SEC. 402. SPECIAL RULES.                                 Chief of Engineers, dated May 23, 2019, with           carry out the project for water supply, Wil-
                                              (a) GREAT LAKES AND MISSISSIPPI RIVER                  the following modifications:                           lamette River Basin Review Reallocation,
                                            INTERBASIN PROJECT, BRANDON ROAD, WILL                     (1) The Federal share of the cost of con-            Oregon, authorized by section 401 of this Act,
                                                                                                     struction shall be 80 percent.                         substantially in accordance with the terms




dlhill on DSK120RN23PROD with HOUSE
                                            COUNTY, ILLINOIS.—The Secretary shall carry
                                            out the project for ecosystem restoration,                 (2) The Secretary may include the addition           and conditions described in the Report of the
                                            Great Lakes and Mississippi River Interbasin             or substitution of technologies or measures            Chief of Engineers, dated December 18, 2019,
                                            project, Brandon Road, Will County, Illinois,            not described in the report, as the Secretary
                                                                                                                                                            with the following modifications:
                                            authorized by section 401 of this Act, sub-              determines to be advisable.
                                                                                                                                                              (1) The Secretary shall meet the obliga-
                                            stantially in accordance with the terms and                (b) WILLAMETTE RIVER BASIN REVIEW RE-                tions of the Corps of Engineers under the En-
                                            conditions described in the Report of the                ALLOCATION STUDY.—The Secretary shall                  dangered Species Act of 1973 by complying




                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00068   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                H3951
                                            with the June 2019 NMFS Willamette Basin                   (6) CHACON CREEK, TEXAS.—The project for             Chair NAPOLITANO, and Subcommittee
                                            Review Study Biological Opinion Reasonable               flood risk management, ecosystem restora-              Ranking Member BRUCE WESTERMAN in
                                            and Prudent Alternative until such time, if              tion, and other purposes, Chacon Creek,                sponsoring the Water Resources Devel-
                                            any, as it is modified or replaced, in whole or          Texas, as described in the review assessment
                                                                                                                                                            opment Act of 2020.
                                            in part, through the consultation process                of the Secretary, titled ‘‘Review Assessment
                                                                                                                                                              The bill under consideration today
                                            under section 7(a) of the Endangered Species             of Chacon Creek, Texas Section 203 Inte-
                                            Act of 1973.                                             grated Feasibility Report and DRAFT Envi-              was developed in a bipartisan manner
                                              (2) The Secretary may reallocate not more              ronmental Assessment (August 2018)’’ and               with input from both sides of the aisle.
                                            than 10 percent of overall storage in the                dated September 2018, at a total cost of               The legislation was considered in com-
                                            joint conservation pool, as authorized by                $51,973,000.                                           mittee and favorably reported by voice
                                            this Act and without further congressional                 (b) REQUIREMENTS.—The Secretary may                  vote.
                                            action, if such reallocation is consistent               only carry out a project authorized under                H.R. 7575 includes projects and policy
                                            with the ongoing consultation under section              subsection (a)—                                        provisions that impact communities
                                            7(a) of the Endangered Species Act of 1973 re-             (1) substantially in accordance with the ap-         across the Nation. It authorizes con-
                                            lated to Willamette Valley System oper-                  plicable review assessment for the project
                                                                                                     submitted by the Secretary under section
                                                                                                                                                            struction of 34 projects studied and ap-
                                            ations.
                                              (3) The Secretary shall ensure that the re-            203(c) of the Water Resources Development              proved by the chief of engineers since
                                            vised reallocation is not reallocated from a             Act of 1986, as identified in subsection (a) of        WRDA 2018 was signed into law.
                                            single storage use, does not seriously affect            this section, and subject to such modifica-              It authorizes 36 new Corps of Engi-
                                            authorized project purposes, and does not                tions or conditions as the Secretary con-              neers feasibility studies and directs the
                                            otherwise involve major operational changes              siders appropriate and identifies in a final           Corps to expedite the completion of 41
                                            to the project.                                          assessment that addresses the concerns, rec-           ongoing studies, which were submitted
                                              (c) CANO MARTIN PENA, SAN JUAN, PUERTO                 ommendations, and conditions identified by             to the Corps by local sponsors willing
                                            RICO.—Section 5127 of the Water Resources                the Secretary in the applicable review as-             to share the costs of these project stud-
                                            Development Act of 2007 (121 Stat. 1242) is              sessment; and
                                                                                                                                                            ies.
                                            amended by striking ‘‘$150,000,000’’ and in-               (2) after the Secretary transmits to the
                                                                                                                                                              H.R. 7575 continues our work to en-
                                            serting ‘‘$232,430,000’’.                                Committee on Transportation and Infra-
                                                                                                     structure of the House of Representatives              sure the full utilization of the harbor
                                            SEC. 403. AUTHORIZATION OF PROJECTS BASED                                                                       maintenance trust fund by unlocking
                                                        ON    FEASIBILITY STUDIES PRE-               and the Committee on Environment and
                                                        PARED BY NON-FEDERAL INTER-                  Public Works of the Senate such final assess-          nearly $10 billion. This is $10 billion
                                                        ESTS.                                        ment.                                                  under an initiative started by Ronald
                                                                                                       (c)     TECHNICAL      CORRECTION.—Section           Reagan of taxes collected from ship-
                                              (a) IN GENERAL.—The Secretary is author-
                                                                                                     203(c)(1) of the Water Resources Development           pers that are ultimately paid by con-
                                            ized to carry out the following projects for
                                                                                                     Act of 1986 (33 U.S.C. 2231(c)(1)) is amended,         sumers in the United States. So, for
                                            water resources development and conserva-
                                                                                                     in the matter preceding subparagraph (A), by
                                            tion and other purposes, subject to sub-
                                                                                                     striking ‘‘a report’’ and inserting ‘‘an assess-
                                                                                                                                                            years, we have been taking money
                                            section (b):                                                                                                    under false pretenses and not spending
                                                                                                     ment’’.
                                              (1) FORT PIERCE, ST. LUCIE COUNTY, FLOR-                                                                      that money on its designated purpose.
                                            IDA.—The project for hurricane and storm
                                                                                                            TITLE V—BUDGETARY EFFECTS
                                                                                                     SEC. 501. DETERMINATION OF BUDGETARY EF-
                                                                                                                                                              This bill will finally rectify that
                                            damage reduction, Fort Pierce, St. Lucie                                                                        problem. There is ample need to invest
                                            County, Florida, as described in the review                         FECTS.
                                                                                                       The budgetary effects of this Act, for the           that $10 billion in our ports and har-
                                            assessment of the Secretary, titled ‘‘Review
                                            Assessment of St. Lucie County, Florida                  purpose of complying with the Statutory                bors around the country.
                                            Fort Pierce Shore Protection Project Sec-                Pay-As-You-Go Act of 2010, shall be deter-               The legislation also directs the Sec-
                                            tion 203 Integrated Feasibility Study and En-            mined by reference to the latest statement             retary of the Army to equitably allo-
                                            vironmental Assessment (June 2018)’’ and                 titled ‘‘Budgetary Effects of PAYGO Legisla-           cate maintenance funds to pay for har-
                                            dated July 2018, at a total cost of $33,107,639,         tion’’ for this Act, submitted for printing in         bor operation maintenance needs,
                                                                                                     the Congressional Record by the Chairman of
                                            and at an estimated total cost of $97,958,972                                                                   while addressing the ongoing needs of
                                            for periodic nourishment over the 50-year life           the House Budget Committee, provided that
                                                                                                     such statement has been submitted prior to             the Nation’s largest ports, the Great
                                            of the project.                                                                                                 Lakes harbors, its emerging harbors.
                                              (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—               the vote on passage.
                                                                                                                                                              This is especially important in com-
                                            The project for navigation, Baptiste Collette              The SPEAKER pro tempore. Pursu-
                                                                                                                                                            munities like my district along Or-
                                            Bayou, Louisiana, as described in the review             ant to the order of the House of today,
                                            assessment of the Secretary, titled ‘‘Review
                                                                                                                                                            egon’s southwest coast, where the dif-
                                                                                                     the gentleman from Oregon (Mr. DEFA-
                                            Assessment of Plaquemines Parish Govern-                                                                        ference between life and death for
                                                                                                     ZIO) and the gentleman from Missouri
                                            ment’s Section 203 Study Baptiste Collette                                                                      those who both recreate or fish com-
                                                                                                     (Mr. GRAVES) each will control 30 min-
                                            Bayou     Navigation      Channel      Deepening                                                                mercially is in the conditions of our
                                                                                                     utes.
                                            Project Integrated Feasibility Study and En-
                                                                                                       The Chair recognizes the gentleman                   harbors, jetties, and breakwaters. It is
                                            vironmental Assessment (January 2017,                                                                           literally life and death in very cold
                                            Amended April 2018)’’ and dated June 2018, at            from Oregon.
                                                                                                                                                            water. So, this is incredibly important.
                                            a total cost of $44,920,000.                                                   b 1415                             Before earmarks were banned, I used
                                              (3) HOUMA NAVIGATION CANAL, LOUISIANA.—                                                                       to get my harbors dredged by ear-
                                                                                                                       GENERAL LEAVE
                                            The project for navigation, Houma Naviga-
                                            tion Canal, Louisiana, as described in the re-             Mr. DEFAZIO. Mr. Speaker, I ask                      marking. Since that was banned when
                                            view assessment of the Secretary, titled ‘‘Re-           unanimous consent that all Members                     the Republicans took over in 2010, I
                                            view Assessment of Houma Navigation Canal                have 5 legislative days in which to re-                managed in the first WRDA bill in 2014
                                            Deepening Project Section 203 Integrated                 vise and extend their remarks and in-                  to get a 10 percent set-aside for small
                                            Feasibility Report and DRAFT Environ-                    clude extraneous material on H.R. 7575,                and emerging harbors. That has pro-
                                            mental Impact Statement (June 2018)’’ and                as amended.                                            vided the critical dredging for my dis-
                                            dated July 2018, at a total cost of $253,458,000.          The SPEAKER pro tempore. Is there                    trict and many, many harbors around
                                              (4) PORT FOURCHON BELLE PASS CHANNEL,                                                                         the United States of America.
                                            LOUISIANA.—The project for navigation, Port
                                                                                                     objection to the request of the gen-
                                                                                                     tleman from Oregon?                                      This bill, because we will have a lot
                                            Fourchon Belle Pass Channel, Louisiana, as
                                            described in the review assessment of the                  There was no objection.                              more money, will provide actually 20
                                            Secretary, titled ‘‘Review Assessment of                   Mr. DEFAZIO. Mr. Speaker, I yield                    percent to small and emerging harbors.
                                            Port Fourchon Belle Pass Channel Deepening               myself such time as I may consume.                     We have delayed and deferred projects
                                            Project Section 203 Feasibility Study (Janu-               Mr. Speaker, today, we continue the                  all around the country.
                                            ary 2019, revised January 2020)’’ and dated              Transportation      and    Infrastructure                This bill also recognizes the impor-
                                            April 2020, at a total cost of $95,483,000.              Committee tradition by considering                     tant role that inland waterways play in
                                              (5) WILMINGTON HARBOR, NORTH CAROLINA.—                the fourth consecutive bipartisan                      our Nation and provides a cost-share
                                            The project for navigation, Wilmington Har-              Water Resources Development Act                        shift to help in completing construc-




dlhill on DSK120RN23PROD with HOUSE
                                            bor, North Carolina, as described in the re-
                                                                                                     since 2014, a tradition started by my                  tion of much-needed projects. I would
                                            view assessment of the Secretary, titled ‘‘Re-
                                            view Assessment of Wilmington Harbor,                    friend and predecessor, Bill Shuster. It               give a shout-out to CONOR LAMB from
                                            North Carolina Navigation Improvement                    is a great tradition, and it is an incred-             Pennsylvania as being a tireless advo-
                                            Project Integrated Section 203 Study & Envi-             ible service to our Nation.                            cate on that, as well as other Members.
                                            ronmental Report (February 2020)’’ and dated               I am proud to be joined by Ranking                     WRDA 2020 also includes specific
                                            May 2020, at a total cost of $834,093,000.               Member SAM GRAVES, Subcommittee                        policies that focus on climate change,



                                      VerDate Sep 11 2014   13:34 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00069   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.016   H29JYPT1
                                            H3952                                              CONGRESSIONAL RECORD — HOUSE                                                        July 29, 2020
                                            natural infrastructure solutions, and                    DELGADO, HARLEY ROUDA, and SHARICE                     Committee on the Budget on this important
                                            affordability, and provisions that assist                DAVIDS, they were all instrumental in                  issue.
                                            minority, Tribal, and rural commu-                       bringing important issues to the com-                         Sincerely,
                                                                                                                                                                              PETER A. DEFAZIO,
                                            nities.                                                  mittee and contributed to the forma-
                                                                                                                                                                                              Chair.
                                              The bill recognizes the important                      tion of WRDA 2020.
                                            role of resiliency in helping commu-                       The Water Resources Development                        Mr. GRAVES of Missouri. Mr. Speak-
                                            nities meet the current and future                       Act is essential to communities                        er, I yield myself such time as I may
                                            challenges of changing hydrologic con-                   throughout the country that depend                     consume.
                                            ditions and repetitive and more fre-                                                                              Mr. Speaker, I rise today in support
                                                                                                     upon the safe and affordable uses of
                                            quent flooding events. I am glad to in-                                                                         of H.R. 7575, the Water Resources De-
                                                                                                     their ports, harbors, and inland water-
                                            clude provisions in this bill that will                                                                         velopment Act of 2020, or WRDA 2020.
                                                                                                     ways. Our economy, safety, and envi-
                                            ensure taxpayer dollars are spent on                                                                              Two weeks ago, we advanced this bi-
                                                                                                     ronment will benefit from passage of
                                            infrastructure that will be resilient                                                                           partisan legislation out of committee
                                                                                                     WRDA 2020.
                                            and will contribute to the resiliency of                                                                        by voice vote. In taking up this bill, as
                                                                                                       I am proud of our work on this bill,                 the chairman pointed out, we are main-
                                            communities across the country.                          and I urge my colleagues to join me in
                                              It also ensures that all communities,                                                                         taining Congress’ consideration of
                                                                                                     support of this legislation.                           WRDA legislation on a 2-year cycle,
                                            especially communities with socio-                         I reserve the balance of my time.
                                            economic challenges, have a path for-                                                                           something that we have done for some
                                                                                                             HOUSE OF REPRESENTATIVES,
                                            ward in getting the tools they need for                                                                         time now, since 2014.
                                                                                                                  COMMITTEE ON THE BUDGET,
                                            flood protection and ecosystem res-                                     Washington, DC, July 24, 2020.            We are also demonstrating that when
                                            toration. H.R. 7575 continues this tradi-                Hon. PETER A. DEFAZIO,                                 we work in partnership instead of par-
                                            tion with a 2-year extension of the                      Chairman, Committee on Transportation and              tisanship, we can accomplish great
                                            process.                                                     Infrastructure, House of Representatives,          things for the infrastructure and for
                                              We accommodated many, many                                 Washington, DC.                                    the American people.
                                            Member requests from both sides of the                     DEAR CHAIRMAN DEFAZIO: I write to con-                 I want to thank all the members of
                                                                                                     firm our mutual understanding regarding                the committee and staff, especially the
                                            aisle in this bill. There are some provi-                H.R. 7575, the Water Resources Development
                                            sions in this bill, however, that will                                                                          Subcommittee on Water Resources and
                                                                                                     Act of 2020. H.R. 7575 contains provisions
                                            need further review. This legislation                                                                           Environment, for their hard work and
                                                                                                     that fall within the rule X jurisdiction of the
                                            continues in conference.                                 Committee on the Budget. However, in order             their willingness to work together on
                                              For example, H.R. 7575 authorizes six                  to expedite floor consideration of this impor-         this important piece of legislation.
                                            projects where the studies were devel-                   tant legislation, the Committee agrees to                WRDA authorizes 39 critical projects
                                            oped by the non-Federal interest under                   waive formal consideration of the bill.                across the country that originate at
                                            section 203 of WRDA–86.                                    The Committee on the Budget takes this               the local level but provide far-reaching
                                              The committee has received letters                     action with the mutual understanding that,             benefits throughout their regions and
                                            of concern about whether these                           in doing so, we do not waive any jurisdiction          the national economy.
                                                                                                     over the subject matter contained in this or             WRDA is going to strengthen our
                                            projects have undergone sufficient en-                   similar legislation, and that the Committee
                                            vironmental review, which would in-                                                                             American competitiveness. It is going
                                                                                                     will be appropriately consulted and involved
                                            clude public input of an equivalent                      as the bill or similar legislation moves for-          to provide greater safeguards and peace
                                            level to studies developed by the Corps                  ward so that we may address any remaining              of mind to our constituencies and help
                                            of Engineers. These are valid questions,                 issues within our jurisdiction. The Com-               create jobs. Importantly, this bill sup-
                                            and they may require changes to the                      mittee also reserves the right to seek ap-             ports the Nation’s inland waterway
                                            203 process as we go to conference with                  pointment to any House-Senate conference               networks and flood protection infra-
                                            the Senate.                                              convened on this legislation or similar legis-         structure.
                                                                                                     lation and requests your support if such a re-           In my home State of Missouri, we ex-
                                              I would like to recognize a few indi-                  quest is made.
                                            vidual members on the Committee on                                                                              perienced devastating high water in
                                                                                                       Thank you for agreeing to include our ex-
                                            Transportation and Infrastructure for                                                                           2019. RECORD flooding along the Mis-
                                                                                                     change of letters in the Congressional
                                            their valuable contributions to this                     Record. I appreciate your cooperation re-              souri River destroyed homes, farms,
                                            bill: Chairwoman GRACE NAPOLITANO,                       garding this legislation and look forward to           and businesses in communities like Big
                                            for her dogged support in addressing                     continuing to work with you as this measure            Lake and Craig, Missouri, and many of
                                            the maintenance needs of our largest                     moves through the legislative process.                 those affected are still recovering to
                                            ports, particularly southern California,                       Sincerely,                                       this day.
                                            and for meeting future water supply                                            JOHN A. YARMUTH,                   The threat of flooding remains for
                                                                                                                                        Chairman.           many Americans, and this bill author-
                                            needs of arid regions around the Na-
                                            tion, and the dedication of some of the
                                                                                                                                --                          izes some bold new plans to evaluate
                                                                                                         HOUSE OF REPRESENTATIVES, COM-                     flood risk reduction in many of the
                                            newest members of my committee.                                MITTEE ON TRANSPORTATION AND
                                              The vice chairwoman of the sub-                              INFRASTRUCTURE,
                                                                                                                                                            major river basins.
                                            committee is Ms. MUCARSEL-POWELL                                         Washington, DC, July 24, 2020.           This is a good first step to providing
                                            from Florida, and her dedication to                      Hon. JOHN YARMUTH,                                     greater protections for the lives and
                                            getting provisions to protect and re-                    Chairman, Committee on the Budget,                     property of the folks in the Lower Mis-
                                            store the national treasure that is the                  House of Representatives, Washington, DC.              souri River Basin. My district also bor-
                                            Everglades was tireless.                                   DEAR MR. YARMUTH: Thank you for your                 ders the Mississippi River, with local
                                              I also recognize the work of the gen-                  letter regarding H.R 7575, the Water Re-               communities facing very similar chal-
                                            tlewoman from Texas (Mrs. FLETCHER)                      sources Development Act of 2020. I appre-              lenges with flood control and naviga-
                                                                                                     ciate your decision to waive formal consider-
                                            for her incredibly strong advocacy for                                                                          tion.
                                                                                                     ation of the bill.
                                            the Port of Houston and their needs,                                                                              To address these issues, WRDA pro-
                                                                                                       I agree that the Committee on the Budget
                                            and for the protection and sustain-                      has valid jurisdictional claims to certain             vides new authority for the construc-
                                            ability of the businesses and commu-                     provisions in this important legislation, and          tion of permanent flood control struc-
                                            nities along the Texas Gulf Coast that                   I further agree that by forgoing formal con-           tures in communities that experience
                                            depend upon that navigable area.                         sideration of the bill, the Committee on the           repetitive losses as a result of flood
                                              I also recognize the new Member, the                   Budget is not waiving any jurisdiction over            events. We simply have to stop rebuild-
                                            gentlewoman         from    Iowa     (Ms.                any relevant subject matter. Additionally, I           ing back to the same inadequate stand-
                                            FINKENAUER), for her advocacy in ad-                     will support the appointment of conferees              ards in repeatedly flooded communities
                                                                                                     from the Committee on the Budget should a




dlhill on DSK120RN23PROD with HOUSE
                                            dressing flooding risks of rural and eco-                                                                       like mine in north Missouri.
                                                                                                     House-Senate conference be convened on this
                                            nomically disadvantaged communities                      legislation. Finally, this exchange of letters           This bill also streamlines the Public
                                            within the Mississippi River Valley.                     will be included in the Congressional Record           Law 84–99 program to ensure critical
                                              As I mentioned before, CONOR LAMB                      when the bill is considered on the floor.              projects under this program can be
                                            contributed. ANGIE CRAIG, Mr. PAPPAS                       Thank you again and I look forward to                done more efficiently and more effec-
                                            from New Hampshire, Representative                       continuing to work collaboratively with the            tively.



                                      VerDate Sep 11 2014   15:44 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00070   Fmt 4634   Sfmt 0634   E:\CR\FM\K29JY7.068   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                      H3953
                                              It has been more than a year since                     commend the committee and its chair                    to regular order for consideration of
                                            floods devastated parts of my district,                  for taking important steps updating re-                water resources projects. Regularly
                                            and I am still getting calls from levee                  quirements for resiliency, embedding                   overseeing the improvement of our Na-
                                            districts and communities on both the                    beneficial reuse into the Corps’ project               tion’s infrastructure is one of Congress’
                                            Mississippi and the Missouri Rivers                      development process, and investing and                 most important responsibilities.
                                            about issues they are having with this                   rebuilding the Nation’s water infra-                     This is a good, commonsense bill, and
                                            program. Under this bill, some of that                   structure for the 21st century, all of                 I want to thank Chair DEFAZIO and es-
                                            is going to be alleviated.                               which will create good jobs across this                pecially Chair NAPOLITANO for her lead-
                                              The bill also delays construction and                  Nation.                                                ership on our Water Resources and En-
                                            requires further evaluation of intercep-                   Let me applaud Chairman DEFAZIO                      vironment Subcommittee, and both of
                                            tion-rearing complexes, or IRCs. These                   and the ranking member for their care-                 them for working across the aisle with
                                            expensive and unproven projects are                      ful work to develop a bipartisan bill.                 us.
                                            supposedly designed to save the pallid                   The Water Resources Development Act                      Finally, Mr. Speaker, I want to rec-
                                            sturgeon, but we don’t know if they                      of 2020 enjoys broad support and will                  ognize the incredible staff work on
                                            will actually do that. What we do know                   ensure our Nation’s continued pros-                    both sides of the aisle, but, in par-
                                            is that they are disastrous for naviga-                  perity.                                                ticular, the Republican staff, which in-
                                            tion and disastrous for flood control                                                                           cludes Ian Bennitt, Jon Pawlow, and
                                            along the Missouri River.                                                  b 1430
                                                                                                                                                            Victor Sarmiento. I also want to recog-
                                              This bill recognizes the Corps should                    Mr. GRAVES of Missouri. Mr. Speak-                   nize Jefferson Deming on my staff for
                                            not build any more IRCs until it is                      er, I yield 3 minutes to the gentleman                 his work.
                                            proven that they won’t negatively im-                    from Arkansas (Mr. WESTERMAN), who                       Mr. Speaker, I urge all Members to
                                            pact navigation and flood protection                     is on the Water Resources and Environ-                 support H.R. 7575.
                                            for many of our towns, farms, and busi-                  ment Subcommittee.                                       Mr. DEFAZIO. Mr. Speaker, I in-
                                            nesses along the river.                                    Mr. WESTERMAN. Mr. Speaker, I                        cluded in the RECORD a letter from
                                              Additionally, this legislation pro-                    thank the Republican leader and our                    Chairman JOHN YARMUTH from the
                                            vides important new tools and funding                    ranking member, Mr. GRAVES from                        House Committee on the Budget agree-
                                            set-asides for rural communities. It en-                 Missouri, for their continued leader-                  ing to waive consideration of H.R. 7575,
                                            sures that major construction and re-                    ship on the consideration of the Water                 as amended, as well as my response to
                                            habilitation efforts on the inland wa-                   Resource     Development      Acts,    or              Chairman YARMUTH expressing appre-
                                            terway system are completed more                         WRDAs.                                                 ciation for his willingness to work co-
                                            quickly, and it offsets new project au-                    Today I rise in strong support of H.R.               operatively on this legislation.
                                            thorizations with deauthorizations of                    7575, WRDA 2020. H.R. 7575 strengthens                   Mr. Speaker, I also include in the
                                            old, out-of-date projects to ensure fis-                 our Nation’s ability to withstand se-                  RECORD several letters of support from
                                            cal responsibility.                                      vere weather and flood events. It au-
                                              This is a commonsense, bipartisan                                                                             organizations and stakeholders in sup-
                                                                                                     thorizes the construction of key water                 port of H.R. 7575.
                                            bill, and I want to thank Chairman                       infrastructure projects, creates jobs                                                   JULY 28, 2020.
                                            DEFAZIO, Chairwoman NAPOLITANO, and                      here at home, and directly contributes                   DEAR MEMBERS OF THE U.S. HOUSE OF REP-
                                            Ranking Member WESTERMAN for their                       to our economic growth and competi-                    RESENTATIVES,
                                            partnership in this bipartisan effort.                   tiveness.                                                The farmers, ranchers, food and beverage
                                              Mr. Speaker, I urge all Members to                       The Subcommittee on Water Re-                        manufacturers, processors, package suppliers
                                            support H.R. 7575, and I reserve the bal-                sources and Environment, where I have                  and agricultural product marketers that
                                            ance of my time.                                                                                                comprise our memberships are dedicated to
                                                                                                     the honor of serving as ranking mem-                   providing the safe, abundant and affordable
                                              Mr. DEFAZIO. Mr. Speaker, I yield 2                    ber, has jurisdiction over the water re-
                                            minutes to the gentlewoman from Ohio                                                                            food, fiber and feed required to ensure our
                                                                                                     sources development missions of the                    country stays healthy and fed.
                                            (Ms. KAPTUR).                                            U.S. Corps of Engineers. H.R. 7575 au-                   Because American agriculture’s competi-
                                              Ms. KAPTUR. Mr. Speaker, I rise in
                                                                                                     thorizes vital Corps projects for navi-                tive advantage largely depends upon the
                                            support of the Water Resources Devel-                                                                           quality, reliability, accessibility and cost-ef-
                                                                                                     gation; flood control; shoreline protec-
                                            opment Act.                                                                                                     fectiveness of the national transportation
                                              This bill, which was artfully and                      tion; recreation; water supply; environ-
                                                                                                     mental protection, restoration, and en-                system, our organizations commend Con-
                                            carefully drafted by Chairman DEFAZIO                                                                           gress for consistently examining water infra-
                                            and the chair of the Water Resources                     hancement; and fish and wildlife man-                  structure projects every two years and write
                                            and Environment Subcommittee, Con-                       agement.                                               today to urge your support of H.R. 7575, the
                                            gresswoman NAPOLITANO, enjoys broad                        This WRDA bill focuses on sup-                       Water Resources Development Act (WRDA)
                                            bipartisan support.                                      porting more resilient infrastructure,                 of 2020.
                                              In particular, this bill includes provi-               increasing rural flood protection, ad-                   As you know, agricultural commodities
                                                                                                     dressing the maintenance backlogs at                   move via truck, rail, barge and ocean-going
                                            sions that will protect the Great                                                                               vessels. Consistent and timely focus on the
                                            Lakes, which contain 90 percent of                       our Nation’s ports and harbors, and
                                                                                                     prioritizes our Nation’s inland water-                 U.S. inland waterways transportation net-
                                            North America’s fresh surface water.                                                                            work is vital to agricultural stakeholders be-
                                              It includes a specific authorization of                ways.                                                  cause 20 percent of a farmer’s income de-
                                            the invasive species control system at                     This bill will help key projects in my               pends on exports. Inland waterway barge
                                            Brandon Road Lock and Dam. Once                          home State of Arkansas that will spur                  transportation is the least expensive, most
                                            completed, Brandon Road will prevent                     economic development and prevent fur-                  efficient and most environmentally friendly
                                            Asian carp and other invasive species                    ther environmental degradation. It ad-                 mode, and U.S. locks and dams help relieve
                                            from entering the Great Lakes.                           vances the long-stalled MKARNS deep-                   congestion and wear-and-tear on highways as
                                              The Great Lakes delegation has                         ening project, protects the water sup-                 well as discipline rail rates.
                                                                                                     ply for users of the Ouachita-Black sys-                 With respect to U.S. port and inland water-
                                            fought for that authorization for near-                                                                         ways infrastructure, H.R. 7575 includes two
                                            ly a decade. Since 2010, when Congress                   tem, and begins the process of pre-                    notable provisions we wish to highlight.
                                            authorized the Great Lakes interbasin                    venting bank destabilization of the                    Both Section 101 concerning the Harbor
                                            study, our delegation has worked for a                   Sulphur River.                                         Maintenance Trust Fund (HMTF) and Sec-
                                            long-term and basin-wide solution to                       Our committee passed this bill 2                     tion 108 pertaining to inland waterways
                                            the threat posed by the Asian carp.                      weeks ago by a voice vote, continuing                  projects would positively affect the ability of
                                              Today’s authorization is not the end,                  the strong bipartisan support and the                  our organizations’ members to fulfill their
                                            but it sends a bipartisan and clear mes-                 WRDA tradition.                                        role in the agricultural value chain to serve




dlhill on DSK120RN23PROD with HOUSE
                                                                                                       H.R. 7575 is fiscally responsible, with              American farmers and domestic and global
                                            sage to our Nation that we take the
                                                                                                                                                            customers.
                                            protection of America’s greatest $7 bil-                 new project authorizations fully offset                  As you know, the intent of Section 101 of
                                            lion recreational, fishery, and fresh-                   by deauthorizations of projects that                   H.R. 7575 is to ‘‘unlock’’ the more than $9 bil-
                                            water system seriously.                                  are outdated or no longer viable.                      lion that’s been collected and deposited in
                                              In addition to the bill’s commitment                     Above all, this legislation represents               the HMTF by those that pay the 0.125 per-
                                            to the Brandon Road project, I also                      the continued bipartisan commitment                    cent ad valorem tax based upon the value of




                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00071   Fmt 4634   Sfmt 0634   E:\CR\FM\K29JY7.070   H29JYPT1
                                            H3954                                              CONGRESSIONAL RECORD — HOUSE                                                            July 29, 2020
                                            cargo imports. The inability thus far to ac-             of Port Authorities (AAPA) supports passage            lows non-federal interests to carry out feasi-
                                            cess and spend those dollars on much-needed              of H.R. 7575, the Water Resources Develop-             bility studies and projects, and modify the
                                            port dredging further has eroded the United              ment Act of 2020 through the House of Rep-             cost share of projects funded by the Inland
                                            States’ comparative transportation advan-                resentatives. On behalf of our 78 United               Waterways Trust Fund, among others.
                                            tage and contributed to lost export opportu-             States member ports, AAPA appreciates that               AGC applauds the bipartisan process used
                                            nities to the detriment of U.S. economic                 this legislation expands the budget cap ad-            to develop H.R. 7575 and is hopeful that the
                                            growth. Our organizations strongly support               justment to all the Harbor Maintenance
                                            Section 101, which would provide critical and                                                                   House and U.S. Senate will reach an agree-
                                                                                                     Trust Fund revenues for the U.S. Army                  ment between their respective legislative
                                            overdue access to the existing balance in the            Corps of Engineers (Corps) which would
                                            HMTF so that these funds can be spent on                                                                        proposals this year. Again, AGC urges you to
                                                                                                     unlock approximately $10 billion from the              vote ‘‘yes’’ on H.R. 7575 and looks forward to
                                            dredging as intended.                                    Harbor Maintenance Trust Fund. We are
                                              In addition, we believe that adjusting the                                                                    working with the Congress as the legislative
                                                                                                     pleased to see that the legislation recognizes
                                            cost-share formula for inland waterway con-                                                                     process continues.
                                                                                                     the needs of donor ports, emerging harbors
                                            struction and major rehabilitation of naviga-                                                                         Sincerely,
                                                                                                     and Great Lakes navigation projects and
                                            tion projects, as proposed in Section 108 of                                                                                     JAMES V. CHRISTIANSON,
                                                                                                     look forward to working with you prior to
                                            H.R. 7575, is a prudent policy that would help                                                                          Vice President, Government Relations.
                                            address a critical problem facing our inland             enactment on these provisions.
                                                                                                       The legislation also authorizes new naviga-
                                            waterways transportation system. As you                  tion channel improvement studies as well as
                                            know, the majority of U.S. locks and dams                                                                                                 THE PORT
                                                                                                     authorizing projects to proceed to construc-                                  OF LOS ANGELES,
                                            are operating on borrowed time, having long
                                                                                                     tion. The legislation continues to improve                                              July 16, 2020.
                                            outlived their 50-year design life. Further,
                                                                                                     the efficiency and cost effectiveness of Corps         Hon. PETER DEFAZIO,
                                            most are not of sufficient capacity to handle
                                            modem 1,200-foot barge tows, and others re-              study efforts and product delivery. These ef-
                                                                                                                                                            Chairman, Committee on Transportation & In-
                                            quire more maintenance. Each of these fac-               forts are essential for our Nation’s future
                                                                                                                                                                frastructure, Washington, DC.
                                            tors costs shippers valuable time and re-                economic growth as well as providing family
                                                                                                                                                            Hon. GARRET GRAVES,
                                            sources.                                                 supporting jobs.
                                                                                                       I thank you for your work on these issues            Ranking Member, Committee on Transportation
                                              Section 108 amends the cost-share formula                                                                         & Infrastructure, Washington, DC.
                                            for the construction and major rehabilita-               and others related to maritime infrastruc-
                                                                                                     ture, both included in this bill and other-            Hon. GRACE NAPOLITANO,
                                            tion of each inland waterways navigation
                                                                                                     wise. Our Association looks forward to work-           Chairwoman, Subcommittee on Water Resources
                                            project from the current 50 percent general
                                            revenue and 50 percent Inland Waterways                  ing with you, your Committee staff, and the                and Environment, Washington, DC.
                                            Trust Fund (IWTF) funding to 65 percent                  rest of Congress on passage of this legisla-           Hon. BRUCE WESTERMAN,
                                            general revenue and 35 percent IWTF. The                 tion.                                                  Ranking Member, Subcommittee on Water Re-
                                            policy is a step in the right direction that                   Respectfully,                                        sources and Environment, Washington, DC.
                                            would expedite completion of such projects                               CHRISTOPHER J. CONNOR,                   DEAR CHAIRMAN DEFAZIO, CHAIRWOMAN
                                            and help bring the U.S. inland waterways                                           President and CEO.           NAPOLITANO, RANKING MEMBER GRAVES, AND
                                            transportation system into the 21st century.                                                                    RANKING MEMBER WESTERMAN: On behalf of
                                            For these reasons, we support making per-                         THE CONSTRUCTION ASSOCIATION,                 the Port of Los Angeles, I am writing to
                                            manent the cost share formula adjustment                                                 July 28, 2020.         thank you for your leadership in advancing
                                            in H.R. 7575 to provide certainty for these              Speaker NANCY PELOSI,                                  the Water Resources Development Act of
                                            projects, which reduces construction costs.              House of Representatives,                              2020 and to express our strong support for its
                                              Our organizations strongly support passage             Washington, DC.                                        swift enactment.
                                            of H.R. 7575 because Section 101 and Section             Minority Leader KEVIN MCCARTHY,
                                            108 would enhance U.S. agriculture’s com-                                                                         Combined, the San Pedro Bay ports of Los
                                                                                                     House of Representatives,
                                            petitiveness, contribute to the overall effi-                                                                   Angeles and Long Beach handle more than
                                                                                                     Washington, DC.
                                            ciency of the U.S. transportation system,                                                                       one third of the nation’s containerized im-
                                                                                                     Re H.R. 7575, the Water Resources Develop-             ports and exports. In fact, every single Con-
                                            and promote overall U.S. economic growth
                                            and job creation. We urge you to support and                  ment Act of 2020.                                 gressional district in the nation is reached
                                            approve this critical infrastructure bill so                DEAR SPEAKER PELOSI AND MINORITY LEAD-              by the goods moving through the San Pedro
                                            that negotiations can proceed with the Sen-              ER MCCARTHY: On behalf of the Associated               bay, so maintaining the in-water infrastruc-
                                            ate with the goal of enacting a new WRDA                 General Contractors of America (AGC)—the               ture at these ports is essential for American
                                            law in 2020.                                             leading association in the construction in-            competitiveness in the global economy.
                                                  Sincerely,                                         dustry representing more than 27,000 firms,
                                              Agricultural and Food Transporters Con-                including America’s leading general contrac-             In previous communications we noted that
                                            ference, Agricultural Retailers Association,             tors, specialty-contracting firms, service             historically the San Pedro Bay ports receive
                                            Agriculture Transportation Coalition, Amer-              providers, and suppliers—I urge you to vote            a disproportionately low return of Harbor
                                            ican Farm Bureau Federation, American                    ‘‘yes’’ on H.R. 7575, the Water Resources De-          Maintenance Trust (HMT) revenues, and
                                            Soybean Association, American Sugar Cane                 velopment Act of 2020, which is expected to            what we do receive cannot be used for vital
                                            League, Corn Refiners Association, Farm                  be considered by the U.S. House of Rep-                infrastructure maintenance. We are grateful
                                            Credit Council, Florida Sugar Cane League,               resentatives under the suspension of the               that you have recognized the importance of
                                            Institute of Shortening and Edible Oils, Na-             rules this week.                                       equity for donor ports in your legislation
                                            tional Aquaculture Association, National As-                H.R. 7575 is an essential step forward as           and addressed these priorities:
                                            sociation of Wheat Growers, National Cattle-             Congress works to continue the biennial                  Fair share of HMT funding for donor ports.
                                            men’s Beef Association.                                  process of passing legislation that invests in
                                              National Corn Growers Association, Na-                                                                          Expanded uses for emerging harbors and
                                                                                                     our nation’s water resources infrastructure.
                                            tional Cotton Council, National Council of                                                                      donor ports.
                                                                                                     The predictability of the biennial passage of
                                            Farmer Cooperatives, National Grain and                  water resources development acts is critical             Extension of the 2106 program for donor
                                            Feed Association, National Milk Producers                for all stakeholders invoked in the planning           and energy transfer ports.
                                            Federation, National Oilseed Processors As-              and execution of water resources projects.               A robust and healthy port industry is vital
                                            sociation, North American Millers’ Associa-              Through these investments, H.R. 7575 will              to our nation’s economy. Donor ports, such
                                            tion, North American Renderers Association,              create jobs, improve the quality of life for all       as the Port of Los Angeles, play a funda-
                                            Specialty Soya & Grains Alliance, The Fer-               Americans, protect our communities, facili-            mental role in supporting the national
                                            tilizer Institute, United Fresh Produce Asso-            tate waterborne commerce, restore environ-
                                            ciation, USA Rice, Waterways Council, Inc.,                                                                     freight system and the Harbor Maintenance
                                                                                                     mentally sensitive areas of the country, and           Trust Fund. Full spend of HMT revenues (in-
                                            Western Growers.                                         help grow our economy.                                 cluding the trust fund balance), and fair and
                                                                                                        AGC appreciates that the bill will help en-         equitable allocations, will ensure that this
                                                         AMERICAN ASSOCIATION                        sure that the U.S. Army Corps of Engineers
                                                              OF PORT AUTHORITES,                                                                           important funding is used to enhance our na-
                                                                                                     (Corps) Civil Works Program is appro-                  tion’s competitiveness.
                                                                           July 15, 2020.            priately responsive to the water resources
                                            Hon. PETER DEFAZIO,                                      needs identified by local communities. Spe-              Language in the recently passed CARES
                                            Chairman, House Committee on Transportation              cifically, the bill authorizes more than 30            Act includes ‘‘full-spend’’ to be implemented
                                               and Infrastructure, Washington, DC.                   pending Corps Chief’s Reports, which will fa-          with either the passage of WRDA reauthor-
                                            Hon. SAM GRAVES,                                         cilitate important water resources projects            ization or in January 2021. This makes ad-
                                            Ranking Member, House Committee on Trans-                across the country, authorizes dozens of new           dressing donor equity and expanded uses ex-
                                               portation and Infrastructure, Washington,             feasibility studies, and expedites the comple-         tremely urgent and I am grateful for your




dlhill on DSK120RN23PROD with HOUSE
                                               DC.                                                   tion of many existing feasibility studies. In          work to address these vital issues and am
                                            Re Water Resources Development Act of                    addition, AGC supports the provisions of               happy to express my strong support for this
                                               2020.                                                 H.R. 7575 that ensure funds from the Harbor            bi-partisan legislation.
                                             DEAR CHAIRMAN DEFAZIO AND RANKING                       Maintenance Trust Fund go towards their in-              We applaud your efforts to address this
                                            MEMBER GRAVES: The American Association                  tended uses, extend a pilot program that al-           vital infrastructure need and hope to work




                                      VerDate Sep 11 2014   15:44 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00072   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.019   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                   H3955
                                            with you as this bill moves forward to ad-               Development Act (WRDA) of 2020. Reauthor-                        WRDA 2020 SUPPORT LIST
                                            dress the unique requirements of our na-                 ization of America’s water resources pro-                American Shore and Beach Preservation
                                            tion’s ports.                                            grams is critical to economic growth and en-           Association, Agricultural Working Group,
                                                  Sincerely,                                         vironmental stewardship, and we support                American Association of Port Authorities
                                                               EUGENE D. SEROKA,                     this legislation.                                      (AAPA), American Society of Civil Engi-
                                                                    Executive Director.                WRDA would ensure the viability of the
                                                                                                                                                            neers, Associated General Contractors of
                                                                                                     U.S. Army Corps of Engineers’ Civil Works
                                                                                                                                                            America (AGC), Association of California
                                               [From the National Wildlife Federation,               programs including navigation, flood risk
                                                                                                                                                            Water Agencies, Association of Marina In-
                                                             July 15, 2020]                          management, recreation, and associated en-
                                                                                                     vironmental infrastructure. Enactment of               dustries, BOAT US, Earthjustice, Future
                                                 WATER RESOURCES DEVELOPMENT ACT                                                                            Ports, Great Lakes Metro Chambers Coali-
                                                                                                     this bill would provide critical economic and
                                             INCLUDES WINS FOR WILDLIFE, COMMUNITIES                                                                        tion (GLMCC), Healing Our Waters-Great
                                                                                                     environmental benefits to the United States.
                                              WASHINGTON, DC—The Water Resources                       Reauthorizing these programs prior to                Lakes Coalition, Laborers International
                                            Development Act of 2020, which is being                  their September 30 expiration would provide            Union of North America (LIUNA), Lake Car-
                                            marked up by the House Transportation and                the certainty of federal commitment needed             riers’ Association, Marine Retailers Associa-
                                            Infrastructure Committee, includes numer-                to allow state, local, and private partners to         tion of America.
                                            ous provisions to advance ecosystem restora-             move forward with needed planning and con-               National Association of Counties (NACo),
                                            tion and strengthen climate resilience. The              struction of modern, resilient infrastructure.         National Audubon Society, National Grain
                                            Senate Environment and Public Works Com-                 These important water projects would bring             and Feed Association, National Marine Man-
                                            mittee reported out a related bill, America’s            economic benefits to both rural and urban              ufacturers Association, National Parks Con-
                                            Water Infrastructure Act of 2020, earlier this           regions.                                               servation Association (NPCA), National
                                            year.                                                      The Chamber also applauds the inclusion              Water Supply Alliance, National Wildlife
                                              ‘‘Nature has long been an underutilized                of 34 new project authorizations, additional           Federation (NWF), Port of Los Angeles, Re-
                                            tool in the Army Corps’ toolbox. This bill               provisions to ensure modern, resilient infra-          sources Legacy Fund/Open Rivers Fund, Rise
                                            takes important steps to remedy this, with a             structure, improvements in water supply de-            to Resilience and Waterfront Alliance, Theo-
                                            suite of reforms that remove barriers to                 livery, and increased investment from the              dore Roosevelt Conservation Partnership,
                                            using healthy rivers, floodplains, wetlands              Harbor Maintenance Trust Fund, a long-time             The Nature Conservancy, U.S. Chamber of
                                            and shorelines to protect communities from               priority of both your Committee and the                Commerce, Waterways Council, Inc.
                                            hurricanes and floods,’’ said Melissa Samet,             Chamber.                                                 Mr. DEFAZIO. Mr. Speaker, I yield 2
                                            senior water resources counsel at the Na-                  With less than three months until the cur-           minutes to the gentleman from Illinois
                                            tional Wildlife Federation. ‘‘The National               rent authorization expires, the Chamber is
                                                                                                     pleased that House leadership anticipates              (Mr. GARCÍA), who is a member of the
                                            Wildlife Federation is grateful for the strong
                                                                                                     floor consideration of the bill later this             committee.
                                            leadership of Chairman DeFazio, Sub-
                                            committee Chair Napolitano, Ranking Mem-                 month. We appreciate your Committee mov-                 Mr. GARCÍA of Illinois. Mr. Speaker,
                                            ber Sam Graves and Subcommittee Ranking                  ing promptly to ensure timely action on                I rise in support of the Water Re-
                                            Member Westerman for their bipartisan ef-                these critical issues.                                 sources Development Act of 2020 and
                                            forts to advance important provisions to pro-                  Sincerely,                                       commend the leadership of Chairman
                                            tect frontline communities and vital eco-                                           NEIL L. BRADLEY.            DEFAZIO and Subcommittee on Water
                                            systems including the Everglades, Mis-                                                                          Resources and Environment Chair
                                            sissippi River Delta, and Great Lakes.’’                               WATERWAYS COUNCIL, INC.,
                                                                                                                     Washington, DC, July 28, 2020.         NAPOLITANO.
                                              The National Wildlife Federation supports
                                            many important provisions of this bill, in-              Hon. PETER DEFAZIO,                                      I hail from Chicago and the Nation’s
                                            cluding:                                                 Chairman, Committee on Transportation and              Gold Coast along Lake Michigan, and
                                              Provisions that remove barriers to, and                    Infrastructure, House of Representatives,          we know how important a healthy
                                            drive use of natural infrastructure, including               Washington, DC.                                    Great Lakes system is. Lake Michigan
                                            by ensuring that natural infrastructure solu-            Hon. SAM GRAVES,                                       is not only Chicago’s primary drinking
                                            tions will benefit from the same cost-share              Ranking Member, Committee on Transportation
                                                                                                         and Infrastructure, House of Representa-
                                                                                                                                                            water source, it is part of the largest
                                            requirements as non-structural measures.                                                                        freshwater source in the world—our be-
                                              Careful evaluation of natural infrastruc-                  tives, Washington, DC.
                                            ture solutions to protect communities from                 DEAR CHAIRMAN DEFAZIO AND RANKING                    loved Great Lakes.
                                            storms and floods, including a robust pilot              MEMBER GRAVES: The members of Waterways                  Lake Michigan is a tremendous rec-
                                            program that provides full federal funding               Council, Inc. (WCI) thank you for your lead-           reational resource and economic asset,
                                            for flood and storm risk reduction studies for           ership and commitment to the Water Re-                 and it needs to be protected. This legis-
                                                                                                     sources and Development Act (WRDA) bien-
                                            economically disadvantaged communities                                                                          lation authorizes projects important to
                                            and ensures robust evaluation of natural in-             nial process.
                                                                                                       America’s inland waterways system in-                my constituents.
                                            frastructure solutions.                                                                                           First, the Brandon Road Lock and
                                                                                                     cludes 12,000 miles of commercially operated
                                              Implementation of the Water Resources
                                                                                                     and maintained navigable channels that di-             Dam project must be completed to pre-
                                            Principles, Requirements and Guidelines
                                                                                                     rectly affect 38 states. The inland waterways          vent Asian carp, an invasive species,
                                            (PR&G) by the Corps, including fully engag-
                                                                                                     system is tasked with transporting the na-             from migrating into Lake Michigan.
                                            ing the public in that effort. Effective imple-
                                                                                                     tion’s bulk commodities that keep America
                                            mentation of the PR&G will bring the Corps’                                                                       We must also restore Bubbly Creek, a
                                                                                                     competitive in the most energy-efficient and
                                            water resources planning process in line with            environmentally friendly way. In 2016, 558             degraded waterway that was polluted
                                            21st Century water resources management                  million tons of commodities valued at $300             by Chicago’s meatpacking industry in
                                            principles, and improve water resources                  billion transited the waterways, supporting            the early 1900s and made famous by
                                            planning across the board.                               541,000 American jobs.                                 Upton Sinclair’s ‘‘The Jungle.’’ Restor-
                                              Comprehensive review of the Corps’ miti-                 WCI thanks you for Section 108. This sec-
                                            gation record by the Government Account-
                                                                                                                                                            ing the waterway will create a healthy
                                                                                                     tion adjusts the cost-share formula for the            ecosystem and benefit neighborhoods
                                            ability Office. Ensuring full compliance with            construction and major rehabilitation of in-
                                            mitigation requirements is critical for fish             land waterways navigation projects from the
                                                                                                                                                            like McKinley Park, Bridgeport, and
                                            and wildlife and for the communities and                 current 50 percent general revenue and 50              Pilsen.
                                            economies that rely on these vital resources.            percent Inland Waterways Trust Fund                      Managing storm water systems can
                                                                                                     (IWTF) to 65 percent general revenue and 35            be challenging in Chicago because it is
                                                  CHAMBER OF COMMERCE OF THE                         percent IWTF for seven years. The policy is            heavily urbanized. This bill promotes
                                                        UNITED STATES OF AMERICA,                    a step in the right direction and will help ex-        more natural infrastructure and stud-
                                                                          July 14, 2020.             pedite the completion of inland waterways
                                            Hon. PETER DEFAZIO,
                                                                                                                                                            ies for Chicago area rivers and the
                                                                                                     construction     and    major     rehabilitation
                                            Chairman, Committee on Transportation and                projects during the applicable years. WCI
                                                                                                                                                            Great Lakes river basins to make sure
                                               Infrastructure, House of Representatives,             looks forward to working with the Com-                 future projects preserve our drinking
                                               Washington, DC.                                       mittee as they proceed to conference on                water, protect people’s homes and busi-
                                            Hon. SAM GRAVES,                                         making the cost-share permanent.                       nesses from flooding, and restore our
                                            Ranking Member, Committee on Transportation                Passing this legislation in regular order is         environment so that all communities




dlhill on DSK120RN23PROD with HOUSE
                                               and Infrastructure, House of Representa-              critical to ensuring waterways reliability in          benefit from our rivers and Great
                                               tives, Washington, DC.                                order to keep America competitive. WCI of-
                                                                                                                                                            Lakes.
                                              DEAR CHAIRMAN DEFAZIO AND RANKING                      fers its support of passing WRDA 2020.
                                            MEMBER GRAVES: The U.S. Chamber of Com-                         Sincerely,                                        I am proud of the bipartisan effort
                                            merce applauds the bipartisan approach                                             TRACY ZEA,                   developing and passing this legislation
                                            taken by your Committee in advance of to-                                       President and CEO,              through the Transportation and Infra-
                                            morrow’s markup of the Water Resources                                         Waterways Council, Inc.          structure Committee.



                                      VerDate Sep 11 2014   15:44 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00073   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.025   H29JYPT1
                                            H3956                                              CONGRESSIONAL RECORD — HOUSE                                                        July 29, 2020
                                              I also want to give a shout-out to my                  Texas (Mr. BABIN). Together, we led a                  important language to help prevent a
                                            incredible Brookings Institution fel-                    big group of Members from both parties                 public health crisis at the Salton Sea,
                                            low, Christine Gallagher, who has done                   in support of a better way to fund these               California’s largest lake, which is in
                                            tremendous work for my office on                         locks and dams.                                        my district.
                                            transportation and water issues. This                      I especially want to thank Chairman                    The Salton Sea’s shoreline is rapidly
                                            is her last week before she returns to                   DEFAZIO and Ranking Member GRAVES,                     receding, exposing thousands of acres
                                            the National Oceanic and Atmospheric                     who agreed. Now we have a better                       of lake bed and sending dust loaded
                                            Administration, and I congratulate                       chance to rebuild the locks and dams                   with selenium and pesticides into the
                                            her.                                                     and to deliver on the promise we made                  air and into the lungs of residents in
                                              Mr. GRAVES of Missouri. Mr. Speak-                     to the American people.                                my district.
                                            er, I yield 1 minute to the gentleman                      Mr. GRAVES of Missouri. Mr. Speak-                     My provision will authorize the
                                            from Florida (Mr. MAST).                                 er, I yield 2 minutes to the gentleman                 Army Corps of Engineers to take the
                                              Mr. MAST. Mr. Speaker, I rise also,                    from Louisiana (Mr. GRAVES), who is                    next steps and study the construction
                                            today, in support of the Water Re-                       the ranking member of the Aviation                     of a northern perimeter lake project at
                                            sources and Development Act of 2020.                     Subcommittee.                                          the sea, which is the next major
                                            This piece of legislation is a top pri-                    Mr. GRAVES of Louisiana. Mr.                         project under the State of California’s
                                            ority for my constituents in south                       Speaker, first of all, I want to com-                  Salton Sea Management Program, and
                                            Florida on the Treasure Coast because                    mend Republicans and Democrats for                     it will strengthen the Federal-State
                                            it is critical to our public health, our                 coming together. This bill is a bipar-                 partnership.
                                            environment, and our economy.                            tisan bill. It doesn’t mean it is perfect,               Later this week, we will pass the En-
                                              Now, I am smiling because this legis-                  but it means that we all came together                 ergy and Water Development appro-
                                            lation includes a number of provisions                   and we worked together to ensure that                  priations bill, which contains another
                                            that I was proud to write to protect                     we are advancing our Nation’s water                    one of my provisions which will
                                            Florida’s waterways, including accel-                    resources.                                             prioritize the Army Corps’ efforts at
                                                                                                       Mr. Speaker, this bill does every-                   the Salton Sea.
                                            erating construction of the EAA res-
                                                                                                     thing from ecological restoration, to                    I would like to thank Chairman
                                            ervoir, reducing discharges from Lake
                                                                                                     our navigation channels, to flood con-                 DEFAZIO, Congressman VARGAS, and
                                            Okeechobee to the St. Lucie Estuary,
                                                                                                     trol, to hurricane protection.                         Congresswoman NAPOLITANO for their
                                            and to combat harmful algal blooms—                        This is about the resilience and sus-
                                            all yeomen’s work.                                                                                              partnership on this pressing and impor-
                                                                                                     tainability of our community and the
                                              Now, demanding that the Army                                                                                  tant issue, and I urge support for this
                                                                                                     resilience and sustainability of our
                                            Corps of Engineers must seek to reduce                                                                          legislation.
                                                                                                     ecosystem and our economy. These are
                                            discharges into our coastal estuaries is                                                                          Mr. GRAVES of Missouri. Mr. Speak-
                                                                                                     projects that we need to be working to-
                                            a huge victory that everybody in our                                                                            er, I yield 2 minutes to the gentleman
                                                                                                     gether on.
                                            community should be proud of.                              I want to thank my friend, the chair-                from Illinois (Mr. RODNEY DAVIS), who
                                              However, I ask my colleagues this: If                  man, Mr. DEFAZIO; the ranking mem-                     is the ranking member on the High-
                                            their constituents were being, literally,                ber, SAM GRAVES; as well as the sub-                   ways and Transit Subcommittee.
                                            poisoned by the Federal Government,                      committee—friends—chairman            and                Mr. RODNEY DAVIS of Illinois. Mr.
                                            would they fight for anything less than                  ranking member, GRACE NAPOLITANO                       Speaker, I thank Ranking Member
                                            a complete stop to that poisoning?                       and BRUCE WESTERMAN.                                   GRAVES for his leadership on this issue
                                              That is why I am going to continue                       Mr. Speaker, this bill advances im-                  and also the ranking member of the
                                            to be in this fight with everything that                 portant priorities like ensuring section               Water Resources and Environment
                                            I have got, build on this momentum to                    1043 can be expanded to allow our State                Subcommittee, a good friend, Mr.
                                            eliminate all toxic discharges into my                   and non-Federal sponsors to be a part-                 WESTERMAN, along with Chairman
                                            community and send more water south                      ner with the Corps of Engineers—a true                 DEFAZIO and Chair NAPOLITANO of the
                                            into Florida’s Everglades.                               partner—and lead some sections of the                  Water Resources and Environment
                                              Mr. DEFAZIO. Mr. Speaker, I yield 1                    projects; allowing our continuing au-                  Subcommittee.
                                            minute to the gentleman from Penn-                       thorities programs to be expanded; in-                   This is a great day. This is a continu-
                                            sylvania (Mr. LAMB), who is a member                     corporating tools like natural infra-                  ation of what was started in 2014 under
                                            of the committee and who was key in                      structure into the toolbox of achieving                Chairman Shuster at the time, and it
                                            getting the additional investments in                    these objectives that we all share; en-                was with bipartisan success that we
                                            the inland waterways.                                    suring that we attack—and I want to                    began getting the water resource devel-
                                              Mr. LAMB. Mr. Speaker, others be-                      thank my friend from Florida (Mr.                      opment bills passed on a 2-year basis.
                                            fore me have said why it matters that                    MAST) for leading on this—the harmful                  This is another shining example of
                                            we have working locks and dams. It                       algal blooms off the coast of Louisiana,               what bipartisan work can do. We are
                                            has always mattered.                                     which I represent, largest dead zone in                here to talk about the successes of au-
                                              The United States has more miles of                    this Nation on a national basis; and                   thorizing all of the Corps of Engineers’
                                            navigable rivers, lakes, and canals than                 importantly, ensuring that we main-                    programs, which is extremely impor-
                                            anywhere else in the world. It made us                   tain and take a different sustainable                  tant to my district, which is sur-
                                            who we are as a nation. We could move                    approach to the authorized depth of the                rounded by the inland waterway sys-
                                            iron ore to make steel faster, cheaper,                  Mississippi River system, which is                     tem.
                                            and easier than all of our competitors                   America’s commerce superhighway,                         If we don’t do our job in this institu-
                                            because of our water, but especially be-                 connecting 31 States with the least ex-                tion in the Transportation and Infra-
                                            cause of our locks and dams that con-                    pensive and lowest emissions form of                   structure Committee to pass a Water
                                            trol the water. So we need to fix them,                  transportation; putting shipments on                   Resources Development Act on a bian-
                                            and this bill will help.                                 barges and on oceangoing vessels so                    nual basis, then what happens is we put
                                              I hope that America will take note of                  America can compete globally with the                  the effectiveness of our farmers and
                                            something else here today, which is                      great products that we develop here.                   our manufacturers from getting their
                                            that this Congress still works. It might                   Mr. Speaker, I want to thank all the                 products from their manufacturing fa-
                                            not be as well as people would want                      great staff who worked on this, includ-                cilities or their fields into the inland
                                            every single day, but this is a major                    ing Ian Bennitt, Victor Sarmiento,                     waterway system and out into the
                                            bill. This is a major infrastructure bill,               Ryan Seiger, Maggie Ayrea, Paul Saw-                   global marketplace in a cost-effective
                                            and this is a major infrastructure bill                  yer, and all the folks who helped put                  way and in a way that is going to allow




dlhill on DSK120RN23PROD with HOUSE
                                            that has been bipartisan from the very                   this bill together. I urge adoption.                   them to continue to provide jobs in my
                                            beginning and, hopefully, will end bi-                     Mr. DEFAZIO. Mr. Speaker, I yield 1                  district.
                                            partisan when our friends in the Senate                  minute to the gentleman from Cali-                       One aspect of this bill I am particu-
                                            work with us to get this done.                           fornia (Mr. RUIZ).                                     larly grateful for is the cost share ad-
                                              I want to give a special thanks to my                    Mr. RUIZ. Mr. Speaker, the Water                     justment in the Inland Waterways
                                            Republican friend and colleague from                     Resources Development Act contains                     Trust Fund. This is a big deal for us to



                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00074   Fmt 4634   Sfmt 0634   E:\CR\FM\K29JY7.072   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                H3957
                                            upgrade our antiquated lock and dam                      flooding last year. These floods ravaged                 This bill turns years of advocacy to
                                            system along the Illinois and Mis-                       farmland, destroyed essential infra-                   dredge, widen, and improve two-way
                                            sissippi Rivers. This is a success story.                structure, like highways, water treat-                 traffic on the Houston Ship Channel
                                              I thank Chairman DEFAZIO and                           ment plants, and levees that had with-                 into real results. This will allow for a
                                            Ranking Member GRAVES. I do also                         stood the test of time for decades. The                more efficient, safe, and productive wa-
                                            want to thank the staff of the Trans-                    Army Corps of Engineers has worked                     terway for all. But I also recognize
                                            portation and Infrastructure com-                        within their authority to address these                that there is still much work to be
                                            mittee. They worked hard. All of them                    water management issues around our                     done. It is not an exaggeration to say
                                            deserve a round of thanks, and I appre-                  State; however, they have not been                     that by spending $1 million today on
                                            ciate the efforts on not just this bill,                 able to address every concern.                         hurricane and flood prevention infra-
                                            but every other piece of legislation                       I appreciate the chairman and rank-                  structure, we can save a billion dollars
                                            that goes through that great com-                        ing member working with me to ensure                   in damages down the road from an-
                                            mittee.                                                  inactive levees have an opportunity to                 other storm like Hurricane Harvey,
                                              Mr. Speaker, I urge a ‘‘yes’’ vote on                  receive assistance from the Army                       which dumped 60 inches of rain on my
                                            this bill, and I am glad to see the proc-                Corps of Engineers if they meet certain                district—a North American rainfall
                                            ess is working today.                                    criteria. Peru, Nebraska, is one of the                record, by the way.
                                                                                                     many communities that could be                           Thankfully, this bill contains numer-
                                                              b 1445
                                                                                                     helped by this legislative language.                   ous provisions for me and my col-
                                              Mr. DEFAZIO. Mr. Speaker, I yield 2                      Mr. Speaker, again, I urge my col-                   leagues on both sides of the aisle that
                                            minutes to the gentlewoman from Cali-                    leagues to vote ‘‘yes’’ on this bipar-                 work to address these critical needs. It
                                            fornia (Ms. BARRAGÁN).                                  tisan bill.                                            is a great honor to serve the people of
                                              Ms. BARRAGÁN. Mr. Speaker, I                            Mr. DEFAZIO. Mr. Speaker, I yield 1                  Southeast Texas in Congress in pro-
                                            thank Chairman DEFAZIO for working                       minute to the gentleman from Texas                     ducing      legislation      like    this
                                            in a bipartisan manner, and sub-                         (Mr. CUELLAR).                                         bipartisanly—one of the biggest rea-
                                            committee Chairwoman NAPOLITANO,                           Mr. CUELLAR. Mr. Speaker, I thank                    sons why.
                                            to make sure this bill got through on a                  Chairman DEFAZIO and Ranking Mem-                        Mr. Speaker, I again thank the bipar-
                                            bipartisan basis.                                        ber GRAVES and their staff for the won-                tisan work of the chairman, the rank-
                                              Mr. Speaker, I am proud that two                       derful work that they did for putting                  ing member, and also the staff and the
                                            policy changes that I led the fight for                  this bipartisan bill together, and also                subcommittee chair.
                                            have been included in this legislation.                  Chairwoman GRACE NAPOLITANO.                             Mr. DEFAZIO. Mr. Speaker, I yield 1
                                            Flooding disproportionately impacts                        Mr. Speaker, for the last 14 years, I                minute to the gentlewoman from
                                            low-economic communities and people                      have been working in Congress to advo-                 Washington State (Ms. SCHRIER).
                                            of color.                                                cate for the full authorized funding of                  Ms. SCHRIER. Mr. Speaker, I thank
                                              Mr. Speaker, 18 months ago, a severe                   Laredo, Texas’ Chacon Creek Restora-                   the chairman for yielding.
                                            storm in my district flooded the streets                 tion Project.                                            Mr. Speaker, in Washington State,
                                            of Compton and shut down parts of the                      The Army Corps now, once we get                      we are blessed with an abundance of
                                            710 freeway. Many communities lack                       this done, can carry out the flood risk                rivers and lakes that support fish and
                                            the money to pay for studies to plan                     management and ecosystem project to-                   wildlife. Right now, projects like modi-
                                            and develop projects that can reduce                     taling about $52 million. The flood                    fying tide gates and restoring or recon-
                                            damage from flooding and storms. As                      mitigation component will evacuate                     necting floodplains and wetlands are
                                            part of a new program funded by this                     250 homes from the floodplain, from                    not getting the priority they need to
                                            bill, the Federal Government will now                    Lake Casa Blanca all the way down to                   protect these important ecosystems.
                                            cover 100 percent of the cost of these                   the Rio Grande along the Chacon                          I am so pleased that the bill I intro-
                                            studies for a select number of disadvan-                 Creek.                                                 duced with Congressman RICK LARSEN
                                            taged communities.                                         This ecosystem restoration compo-                    was included in WRDA. By prioritizing
                                              This bill also makes it less costly for                nent will also include 417 acres of wet-               rivers with the greatest chance of re-
                                            communities to restore nature in ways                    land and riparian restoration. This is a               covery, we have the best shot at pro-
                                            that will reduce the risk of flooding                    natural treasure that we have in La-                   tecting these waterways and achieving
                                            and help provide cleaner air and water.                  redo, Texas, and it will provide hun-                  the largest return on our investments.
                                              For example, it will be easier to re-                  dreds of acres of new recreational and                   Healthy rivers mean clean water for
                                            store areas where water covers the soil,                 educational parklands.                                 fish, wildlife, and communities, and
                                            known as wetlands, such as the                             Mr. Speaker, the Chacon Creek is a                   healthy salmon runs help us meet our
                                            Dominguez Gap Wetlands along the Los                     tremendous natural resource in La-                     treaty rights obligations, ensure thriv-
                                            Angeles River. Or we can more easily                     redo, and I thank the ranking member                   ing local economies and recreational
                                            afford planting street trees and trees in                and committee staff for doing this                     opportunities, and protect our endan-
                                            local parks to absorb flood water, cool                  great work.                                            gered salmon and orca populations.
                                            the community, and clean the air.                          Mr. GRAVES of Missouri. Mr. Speak-                     Mr. GRAVES of Missouri. Mr. Speak-
                                              In short, this bill will make our com-                 er, I yield 11⁄2 minutes to the gentleman              er, I yield 2 minutes to the gentle-
                                            munities stronger, built to last, and                    from Texas (Mr. BABIN).                                woman from West Virginia (Mrs. MIL-
                                            better prepared for the future.                            Mr. BABIN. Mr. Speaker, I thank                      LER).
                                              Mr. Speaker, I urge a ‘‘yes’’ vote on                  Ranking Member GRAVES and Chair-                         Mrs. MILLER. Mr. Speaker, I thank
                                            the Water Resources Development Act                      man DEFAZIO.                                           Chairman DEFAZIO and Ranking Mem-
                                            of 2020.                                                   Mr. Speaker, Southeast Texas is the                  ber GRAVES.
                                              Mr. GRAVES of Missouri. Mr. Speak-                     global leader in creating reliable, af-                  Mr. Speaker, I rise today in support
                                            er, I yield 1 minute to the gentleman                    fordable energy that powers America                    of this year’s bipartisan Water Re-
                                            from Nebraska (Mr. SMITH).                               and, quite frankly, much of the world.                 sources Development Act.
                                              Mr. SMITH of Nebraska. Mr. Speak-                      But we can’t do that without modern-                     Our country was built on an elabo-
                                            er, I appreciate the gentleman yielding                  izing and improving our water infra-                   rate system of inland waterways, ports,
                                            me time.                                                 structure, which it is my honor to have                and harbors to facilitate trade and
                                              Mr. Speaker, I rise today to support                   achieved in this bill for the people of                transportation. And nearly every com-
                                            the Water Resources Development Act                      the 36th Congressional District of                     munity in our country relies on open
                                            of 2020. I appreciate the Committee on                   Texas, and by extension, all American                  waterways to move their products.
                                            Transportation      and    Infrastructure                families.                                                My district is no exception. We are




dlhill on DSK120RN23PROD with HOUSE
                                            bringing us a strong bipartisan prod-                      My district has four ports, including                home to the Port of Huntington Tri-
                                            uct, of which you have heard. This                       the main port terminal of the Port of                  State on the Ohio River. This inter-
                                            meets the water management needs                         Houston. The Houston Ship Channel is                   connected water system creates jobs
                                            across our country.                                      the busiest U.S. deep-draft waterway,                  and ensures that Appalachia remains a
                                              The Third District of Nebraska was                     and it is the top exporting port in the                competitive     region    of    economic
                                            heavily impacted by unprecedented                        Nation.                                                growth.



                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00075   Fmt 4634   Sfmt 0634   E:\CR\FM\K29JY7.073   H29JYPT1
                                            H3958                                              CONGRESSIONAL RECORD — HOUSE                                                             July 29, 2020
                                              As we rethink and reform America’s                     ty, are often forced to boil water be-                    Mr. Speaker, the most disadvantaged
                                            supply chains post-COVID, we must                        cause lines are failing, and believe it or             persons are the ones that suffer the
                                            continue to open, update, and mod-                       not, we are still finding straight pipes               most. I am grateful for this bill, and I
                                            ernize key water infrastructure to                       dumping raw sewage into some of our                    ask support for this legislation.
                                            maintain safety and efficiency. WRDA                     beautiful streams.                                        Mr. Speaker, I rise in strong and enthusi-
                                            investments secure this mission.                           Thanks to Section 531, some 35,000                   astic support of H.R. 7575, the Water Re-
                                              WRDA also delivers protection from                     families in Southern and Eastern Ken-                  sources Development Act for 2020, which
                                            hurricanes and flooding. In my district                  tucky now have their own septic sys-                   strengthens America’s competitive edge by in-
                                            in southern West Virginia, we saw dis-                   tem or access to a reliable wastewater                 vesting in our ports, harbors and inland water-
                                            aster strike in 2016 when our dams                       system, and over 90 percent of my rural                ways, builds more resilient communities, and
                                            overflowed, and our rivers tore through                  region now has access to clean water.                  creates additional flexibility for the Corps to
                                            many vibrant communities. As we re-                        But it should be 100 percent in every                address the water resources needs of eco-
                                            cover and rebuild, we must also prepare                  part of America. Anything less is                      nomically disadvantaged communities, com-
                                            for the future.                                          shameful. And that is why this funding                 munities of color, and rural communities.
                                              If we pass this bill, we can double the                increase and this bill are so critical.                   I thank Congressman DEFAZIO and Con-
                                            funding for flood protection in central                    Mr. Speaker, I thank the ranking                     gressman GRAVES of Missouri, the Chair and
                                            West Virginia and triple the funding in                  member, Mr. GRAVES, and Chairman                       Ranking Member of the Committee on Trans-
                                            southern West Virginia. The vast ma-                     DEFAZIO for bringing a great bill out,                 portation and Infrastructue, and Congress-
                                            jority of American communities lie                       and I urge its support.                                woman       NAPOLITANO       and   Congressman
                                            along key U.S. waterways. And while I                      Mr. DEFAZIO. Mr. Speaker, I yield 2
                                                                                                                                                            WESTERMAN, the Water Development Re-
                                                                                                     minutes to the gentlewoman from
                                            work for my district, countless others                                                                          sources Subcommittee Chair and Ranking
                                                                                                     Texas (Ms. JACKSON LEE).
                                            will also see increased protections.                                                                            Member, respectively, for their work in shep-
                                                                                                       Ms. JACKSON LEE. Mr. Speaker, I
                                              Mr. Speaker, for the good of our                                                                              herding this important bipartisan legislation to
                                                                                                     thank Chairman DEFAZIO and Ranking
                                            country, I implore my colleagues to                                                                             the floor.
                                                                                                     Member GRAVES for answering the plea
                                            vote ‘‘yes.’’                                                                                                      Mr. Speaker, I support this bipartisan legis-
                                                                                                     of so many of us in relation to our dis-
                                              Mr. DEFAZIO. Mr. Speaker, I yield 1                                                                           lation because it:
                                                                                                     tricts. I thank subcommittee chair-
                                            minute to the gentleman from Cali-                                                                                 1. Authorizes the Houston Ship Channel Ex-
                                                                                                     woman, Mrs. NAPOLITANO, and Ranking
                                            fornia (Mr. PANETTA).                                                                                           pansion Channel Improvement Project, the
                                              Mr. PANETTA. Mr. Speaker, I thank                      Member WESTERMAN.
                                                                                                       Mr. Speaker, I am glad for all these                 federal contribution to which is approximately
                                            the chairman and the ranking member.                                                                            $463 million.
                                                                                                     years I have been working on issues
                                              Mr. Speaker, I rise today in support                                                                             2. Authorizes the construction of all 34
                                                                                                     dealing collectively with our Houston
                                            of the 2020 Water Resources Develop-                                                                            pending Corps Chief’s Reports received since
                                                                                                     port or bayous and the flooding crisis
                                            ment Act, a bill that includes language                                                                         the enactment of WRDA 2018.
                                                                                                     that we have in Houston, Texas, Harris
                                            that I fought for to ensure that the                                                                               3. Authorizes 35 feasibility studies for water
                                                                                                     County.
                                            Federal Government not just supports                       I am glad that this legislation au-                  resources development projects, those identi-
                                            and funds flood control projects, but                    thorizes the Houston Ship Channel Ex-                  fied through the public review process estab-
                                            also supports those projects in eco-                     pansion Improvement Project, part of                   lished by section 7001 of the Water Re-
                                            nomically disadvantaged communities.                     my district, the Federal contribution                  sources Reform and Development Act of
                                              For too long, the Army Corps has re-                                                                          2014.
                                                                                                     to which is approximately $463 million.
                                            lied on an outdated metric when mak-                                                                               4. Directs the Corps to expedite the comple-
                                                                                                     I remember standing at the edge of our
                                            ing decisions whether or not to invest.                                                                         tion of 41 feasibility studies currently under-
                                                                                                     port looking at the mud collecting and
                                            Unfortunately, it is a metric that                                                                              way, including the Houston Regional Water-
                                                                                                     impeding the going and coming of
                                            doesn’t always capture the project’s                                                                            shed Assessment Flood Risk Management
                                                                                                     those vessels.
                                            full value, including the potential loss                   It authorizes the construction of all                Feasibility study, which is certainly needed
                                            of valuable agricultural land, like that                 34 pending Corps Chief’s Reports re-                   given the frequency and severity of historic-
                                            in the Pajaro Valley in my district on                   ceived since the enactment of WRDA;                    level flood events in recent years in and
                                            the central coast of California.                           Authorizes 35 feasibility studies for                around the Houston metropolitan area.
                                              Mr. Speaker, I have to say, though,                    water resources development projects;                     5. Fully unlocks the approximately $10 bil-
                                            with continued pressure by me and                          And directs the Corps, which we have                 lion currently held in the Harbor Maintenance
                                            many other stakeholders, I am proud                      worked with, to expedite the comple-                   Trust Fund (HMTF) by providing the authority
                                            that the 2020 WRDA contains language                     tion of 41 feasibility studies currently               to appropriate additional funds for harbor
                                            that directs the Army Corps when they                    underway, including the Houston Re-                    maintenance needs from the existing balance
                                            re-scope projects to take into account                   gional Watershed Assessment, Flood                     in the Trust Fund.
                                            non-Federal interests, especially in                     Risk Management feasibility study,                        Mr. Speaker, these water development
                                            economically disadvantaged commu-                        which I have introduced over and over                  projects managed by the U.S. Army Corps of
                                            nities.                                                  again. It is now going to move.                        Engineers in consultation with local partners
                                              Mr. Speaker, I thank the chair and                       It fully unlocks the approximately                   are key to preserving our Nation’s economy,
                                            ranking member for their leadership on                   $10 billion currently held in the Harbor               to protecting our communities, and to main-
                                            WRDA, and I look forward to working                      Maintenance Trust Fund.                                taining our quality of life.
                                            with them to reach a final compromise                      It helps bayous in my district,                         The Army Corps of Engineers has been
                                            with the Senate that maintains this                      Greens Bayou, White Oak Bayou, Hunt-                   working with the Harris County Flood Control
                                            language to properly invest in all com-                  ing Bayou; and, of course, it recognizes               District since 1937 to reduce the risk of flood-
                                            munities, not just to save money, but                    that Hurricane Harvey—we had 21 tril-                  ing within Harris County.
                                            to save lives.                                           lion gallons of water, losing housing,                    Current projects include 6 federal flood risk
                                              Mr. GRAVES of Missouri. Mr. Speak-                     203,000 homes were damaged and 12,700                  management projects:
                                            er, I yield 2 minutes to the gentleman                   were destroyed.                                           1. Sims Bayou;
                                            from Kentucky (Mr. ROGERS).                                Finally, what is so important, the                      2. Greens Bayou;
                                              Mr. ROGERS of Kentucky. Mr.                            bill directs the secretary to issue final                 3. Brays Bayou;
                                            Speaker, I thank Chairman DEFAZIO                        agency procedures for its Principles,                     4. White Oak Bayou;
                                            and Ranking Member GRAVES for in-                        Requirements, and Guidelines to en-                       5. Hunting Bayou; and
                                            cluding my request to fund Section 531,                  sure that future water resources devel-                   6. Clear Creek.
                                            the program for Southern and Eastern                     opment projects will maximize sustain-                    In addition to these ongoing projects, the




dlhill on DSK120RN23PROD with HOUSE
                                            Kentucky.                                                able development and affordably ad-                    Army Corps of Engineers operates and main-
                                              In the region that I serve, we are still               dress the needs of economically dis-                   tains the Addicks and Barker (A&B) Detention
                                            fighting for clean water and reliable                    advantaged communities.                                Dams in northwest Harris County.
                                            wastewater systems for our families,                       The bill authorizes the Corps to                        Mr. Speaker, I strongly support this legisla-
                                            our schools, and our businesses. Many                    study, design, and construct water re-                 tion because it is essential in minimizing the
                                            of our folks, like those in Martin Coun-                 sources.                                               risk of flood damage to Houston and Harris



                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00076   Fmt 4634   Sfmt 9920   E:\CR\FM\K29JY7.075   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                H3959
                                            County metropolitan area, the nation’s fourth            for communities that have been subjected to            Long Island and across the country,
                                            largest, is a matter of national significance be-        repetitive flooding events and have received           and I urge my colleagues to support
                                            cause the region is one of the Nation’s major            emergency flood assistance, including con-             this legislation.
                                            technology, energy, finance, export and med-             struction of temporary barriers.                         Mr. DEFAZIO. Mr. Speaker, I reserve
                                            ical centers:                                               This authority will help repetitive loss com-       the balance of my time.
                                               1. The Port of Houston is the largest bulk            munities, especially those in economically-dis-          Mr. GRAVES of Missouri. Mr. Speak-
                                            port in the world;                                       advantaged communities, obtain critical flood          er, I yield 1 minute to the gentleman
                                               2. Texas Medical Center is a world re-                protection.                                            from Ohio (Mr. GONZALEZ).
                                            nowned teaching, research and treatment cen-                The legislation requires the Corps to under-          Mr. GONZALEZ of Ohio. Mr. Speak-
                                            ter;                                                     take an inventory of water resources develop-          er, I would like to thank Chairman
                                               3. Houston is home to the largest conglom-            ment projects and associated properties that           DEFAZIO and Ranking Member GRAVES
                                            eration of foreign bank representation and               are or may be contaminated with PFAS, and              for the opportunity to briefly speak on
                                            second only to New York City as home to the              to develop a plan to remediate and limit poten-        the bipartisan 2020 Water Resources
                                            most Fortune 500 companies; and                          tial human exposure to the contamination.              Development Act.
                                               4. The Houston Watershed Assessment                      The bill requires the Corps to complete its           I am pleased that this bill includes
                                            study area sits within major Hurricane Evacu-            review on minority community and tribal con-           my legislation, the Tuscarawas River
                                            ation arteries for the larger Galveston Gulf             sultation, as well as update Corps’ policies on        Flooding Study Act, which authorizes
                                            Coast region.                                            environmental justice considerations and com-          the U.S. Army Corps of Engineers to
                                               At its peak on September 1, 2017, one-third           munity engagement and consultation.                    conduct a comprehensive feasibility
                                            of Houston was underwater due to Hurricane                  Finally, the legislation authorizes and cre-        study on the Tuscarawas River water-
                                            Harvey flooding.                                         ates additional flexibility for the Corps to ad-       shed.
                                               There were over 41,500 square miles of                dress the water resources needs of economi-              Northeast Ohio is justifiably proud of
                                            land mass impacted by Hurricane Harvey and               cally disadvantaged communities, communities           our historical heritage regarding the
                                            the subsequent flooding that covered an area             of color, and rural communities, such as au-           Ohio and Erie Canal. From the Portage
                                            larger than the States of Connecticut, Massa-            thorizing the Corps of Engineers to provide            Lakes to Canal Fulton, this heritage is
                                            chusetts, New Hampshire, Rhode Island and                technical assistance for resiliency planning,          embedded throughout my district.
                                            Vermont combined.                                        with priority given to economically disadvan-          However, this legacy also means that
                                               Hurricane Harvey dropped 21 trillion gallons          taged communities.                                     cities and villages often encounter re-
                                            of rainfall on Texas and Louisiana, most of it              I urge all Members to join me in voting for         curring flooding events because of the
                                            on the Houston Metroplex.                                H.R. 7575, the bipartisan Water Resources              historical building patterns from the
                                               In September 2017, NASA’s Jet Propulsion              Development Act of 2020.                               19th century.
                                            Laboratory reported that Hurricane Harvey’s                                 b 1500                                Just last summer, southwest Summit
                                            rainfall created 275 trillion pounds of water,             Mr. GRAVES of Missouri. Mr. Speak-                   County      saw    significant   flooding
                                            which caused the crust in and around Houston             er, may I inquire as to the remaining                  throughout the Tuscarawas River
                                            to deform and sink nearly 1 inch because of              time?                                                  basin. This study will serve as a first
                                            the weight.                                                The SPEAKER pro tempore. The gen-                    step toward beginning to find solutions
                                               Over 300,000 structures flooded in south-             tleman from Missouri has 121⁄2 minutes                 to address these challenges.
                                            eastern Texas, where extreme rainfall hit                remaining. The gentleman from Oregon                     I would like to thank the Huntington
                                            many areas that are densely populated.                   has 10 minutes remaining.                              District of the Army Corps for their ex-
                                               Hurricane Harvey is the largest housing dis-            Mr. GRAVES of Missouri. Mr. Speak-                   tensive work with my office on this
                                            aster to strike the U.S. in our Nation’s history.        er, I yield 11⁄2 minutes to the gentleman              issue and Muskingum Watershed Con-
                                               Hurricane Harvey damaged 203,000 homes,               from New York (Mr. ZELDIN).                            servancy District for their knowledge
                                            of which 12,700 were destroyed.                            Mr. ZELDIN. Mr. Speaker, I have the                  and guidance.
                                               Texas flood control districts are still strug-        honor of representing the First Con-                     I urge my colleagues to support this
                                            gling to recover from this record breaking flood         gressional District of New York, lo-                   legislation.
                                            event.                                                   cated on the East End of Long Island,                    Mr. DEFAZIO. Mr. Speaker, I reserve
                                               Nineteen trillion gallons of flood waters             a district almost completely sur-                      the balance of my time.
                                            poured into the Houston Ship Channel from                rounded by water. We were hit really                     Mr. GRAVES of Missouri. Mr. Speak-
                                            area rivers and bayous on the way to the Gulf            hard by Superstorm Sandy, and the                      er, I yield 1 minute to the gentleman
                                            of Mexico.                                               widespread devastation emphasized the                  from Georgia (Mr. ALLEN).
                                               As a consequence, tens of millions of tons            dire need to ensure our communities                      Mr. ALLEN. Mr. Speaker, I rise
                                            of sediment and debris flowed through the big-           were better prepared for the future.                   today to highlight an issue in my dis-
                                            gest waterway in the nation.                               Working hard with my colleagues on                   trict that I have been working tire-
                                               The Port of Houston produces 27 percent of            both sides of the aisle, Colonel Thomas                lessly on, and that is to preserve the
                                            the nation’s gasoline and about 60 percent of            Asbery of the Army Corps, and their                    pool at the New Savannah Bluff Lock
                                            the U.S. aviation fuel.                                  entire hardworking team, this bill                     and Dam.
                                               Investments in all aspects of our Nation’s            prioritizes local projects that are vital                I am extremely disappointed this leg-
                                            water infrastructure pays dividends in the form          to my congressional district.                          islation was brought before the House
                                            of economic activity.                                      That includes the Fire Island to                     with no opportunity to amend the bill
                                               The Houston Ship Channel generates $617               Montauk Point project, which includes                  before negotiations began with the
                                            billion in the U.S. with $265 billion of that in         essential     dredging    and    shoreline             Senate.
                                            Texas representing 16 percent of the state of            projects over 83 miles of coastline.                     The lock and dam, and the pool it
                                            Texas’s GDP.                                               Coastal storm risk management for                    creates, is critical to the Augusta com-
                                               The Port of Houston sustains 2.7 million              Hashamomuck Cove in Southold is in-                    munity and is utilized for municipal
                                            jobs nationally with 1.2 million of them within          cluded, where right now local resi-                    and industrial water supply as well as
                                            the state of Texas.                                      dents, businesses, and first responders                recreation.
                                               Mr. Speaker, let me list a few of the provi-          are paralyzed even during a severe                       The Corps of Engineers recently se-
                                            sions in this bill that will benefit my commu-           thunderstorm.                                          lected a rock weir as an alternative to
                                            nities I represent.                                        Equally as important, this legisla-                  replace the lock and dam, a design that
                                               The bill directs the Secretary to issue final         tion continues to build on these vic-                  drops the pool level and was dem-
                                            agency procedures for its Principles, Require-           tories, jump-starting movement on                      onstrated last year with disastrous re-
                                            ments, and Guidelines (PR&G) to ensure that              projects at Reel Point Reserve and                     sults. Not only does this plan not meet




dlhill on DSK120RN23PROD with HOUSE
                                            future water resources development projects              Shelter Island, Goldsmith’s Inlet in                   the requirements of the WIIN Act, but
                                            will maximize sustainable development and                Southold, and Wading River Creek in                    local stakeholders have expressed seri-
                                            affordably address the needs of economically             Riverhead through authorizing feasi-                   ous concerns with the Corps of Engi-
                                            disadvantaged communities.                               bility studies.                                        neers’ proposal. This option does not
                                               The bill authorizes the Corps to study, de-             The Water Resources Development                      meet the intent of Congress and main-
                                            sign and construct water resources projects              Act is great news for our shorelines on                tain the pool.



                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00077   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.049   H29JYPT1
                                            H3960                                              CONGRESSIONAL RECORD — HOUSE                                                              July 29, 2020
                                              Moving forward with the rock weir is                   Sass, Jack Ruddy, Corey Cooke, Tara                    committee; Camille Touton; Alexa Wil-
                                            unacceptable, and I thank my col-                        Hupman,        Abby       Camp,      Nick              liams; Navis Bermudez; Joe Sheehy,
                                            leagues from Georgia for their bipar-                    Christensen, Justin Harclerode, Tyler                  who works for GRACE NAPOLITANO, who
                                            tisan effort to champion this issue in                   Micheletti, Jamie Hopkins, and Shawn                   couldn’t be here today; and legislative
                                            the recent committee markup.                             Bloch. In addition, I very much want to                counsel Kakuti Lin. Legislative coun-
                                              I urge the committee to work with                      thank Kathy Dedrick, Mohsin Syed,                      sel has been fabulous. Then, the other
                                            me to include language in the final bill                 and the rest of the Democrat full com-                 side of the aisle: Ian Bennitt, Victor
                                            that will repair and maintain the lock                   mittee staff.                                          Sarmiento, Jon Pawlow. Again, thanks
                                            and dam and the pool, while still ac-                      WRDA is a perfect example of Repub-                  to my friend and colleague, the rank-
                                            commodating the mitigation project.                      licans and Democrats working together                  ing member.
                                            It is essential.                                         to address America’s infrastructure
                                                                                                                                                               Mr. Speaker, I urge my colleagues to
                                              Mr. DEFAZIO. Mr. Speaker, I reserve                    needs, as this committee is meant to
                                                                                                                                                            support this legislation, and I yield
                                            the balance of my time.                                  do. I would urge all Members to sup-
                                                                                                                                                            back the balance of my time.
                                              Mr. GRAVES of Missouri. Mr. Speak-                     port this legislation.
                                            er, I yield 1 minute to the gentlewoman                    I want to add, too, Mr. Speaker, the                    Mr. YOUNG. Mr. Speaker, I rise in support
                                            from Puerto Rico (Miss GONZÁLEZ-                        gracious work of and being able to                     of H.R. 7575, the Water Resources Develop-
                                            COLÓN), who understands water issues.                   work with Chairman DEFAZIO. When                       ment Act for 2020. This legislation is the result
                                              Miss GONZÁLEZ-COLÓN of Puerto                        we work together, it actually works                    of bipartisan work and leadership of Com-
                                            Rico. Mr. Speaker, I rise in support of                  quite well, and I want to thank him for                mittee Chairman DEFAZIO and Ranking Mem-
                                            this bill that includes language for                     that.                                                  ber GRAVES and many others. It deserves to
                                            flood control in Puerto Rico. We are                       Mr. Speaker, I yield back the balance                be passed by the this House as a vital con-
                                            now in the hurricane season, and                         of my time.                                            tribution to improving and maintaining our Na-
                                            today, it is announced a tropical storm                    Mr. DEFAZIO. Mr. Speaker, I yield                    tion’s ports system, inland waterways, dams,
                                            between today and tomorrow.                              myself such time as I may consume.                     levees, aids to navigation, flood control, and
                                                                                                       Mr. Speaker, I thank the gentleman                   the many critical support and operational func-
                                              The flood control projects included in
                                                                                                     for his kind words. We find many op-                   tions of our U.S. Army Corps of Engineers in
                                            the bill are Rio Guayanilla, Rio Manati
                                                                                                     portunities to work together. There are                support of national, state and local water re-
                                            in Ciales, and Rio Culebrinas on the
                                                                                                     times when we have significant policy                  sources development needs.
                                            northwestern part of the island, as well
                                                                                                     differences, and we get through it. And
                                            as important provisions to study flood                                                                             Alaska’s 33,904 miles of shoreline dwarf the
                                                                                                     we will keep plugging.
                                            damage, provide resiliency planning as-                    This bill is great for our Nation. On a              Lower 48 and with fewer miles of paved road
                                            sistance, and evaluate seismic risks.                    daily basis, of our Nation’s 58 largest                than Rhode Island, Alaska’s rivers are our
                                              I am also most proud to have secured                   ports, they only have about 40 percent                 highways and our ports are the lifeblood of our
                                            in this bill an increase to the author-                  of their capability due to deferred                    state’s communities. The Committee continues
                                            ization cost for the Cano Martin Pena                    dredging.                                              to make incremental progress on embracing
                                            project, $232.4 million, as established                    We have jetties failing around the                   the unique challenges Alaskan communities
                                            during the feasibility phase in 2016, fix-               Nation. We heard from CONOR LAMB                       face with respect to port and harbor improve-
                                            ing a discrepancy in WRDA 2007. This                     from Pennsylvania. We did great engi-                  ments, inland waterway navigation, flood and
                                            increase ensures updated costs are con-                  neering work in the 1800s and early                    storm protection and other water resource in-
                                            sidered as the project moves forward,                    1900s. I viewed a lock in his district                 frastructure overseen by the Army Corps of
                                            which is especially critical for the de-                 built in the early 1900s, but these                    Engineers.
                                            velopment of eight communities in the                    things do have a lifetime.                                The Army Corps Alaska District is an inte-
                                            San Juan area.                                             The increase in cost share for inland                gral partner to Alaska’s communities man-
                                              Mr. DEFAZIO. Mr. Speaker, I reserve                    waterways is going to make a great dif-                aging significant project demand with limited
                                            the balance of my time.                                  ference. We are finally going to spend                 resources. However, need continues to out-
                                              Mr. GRAVES of Missouri. Mr. Speak-                     the $10 billion that the American peo-                 pace available appropriations and Corps re-
                                            er, I yield myself such time as I may                    ple have put into an account for harbor                sources to get projects completed. The re-
                                            consume.                                                 maintenance on harbor maintenance.                     forms to the Harbor Maintenance Trust Fund
                                              Mr. Speaker, in closing, WRDA 2020                     Things take a long time in Wash-                       included in this bill is a step in the right direc-
                                            is a good bipartisan piece of legislation                ington, D.C. I started on that with Bud                tion and I will continue to advocate for greater
                                            that is going to improve flood control                   Shuster in 1996, but finally, we are                   federal investment for our nation’s water infra-
                                            infrastructure and improve ports, har-                   going to get there.                                    structure.
                                            bors, and inland waterways across the                      This money can and will be very pro-
                                            country.                                                                                                           I am particularly pleased that WRDA 2020
                                                                                                     ductively spent. It will put people to                 contains an authorization for improvements to
                                              This is infrastructure that is critical                work, and it will make our Nation
                                            to protecting our communities and our                                                                           the Port of Nome, Alaska as well as other pro-
                                                                                                     more competitive.                                      visions for ports and harbors in Alaska. It is
                                            farms and businesses in north Missouri                     We had, for quite some time, a dis-
                                            and the rest of America. It is essential                                                                        rewarding to see that a majority of my col-
                                                                                                     pute among the various ports, large,
                                            to the efficient movement of goods,                                                                             leagues from both sides of the aisle in this
                                                                                                     small, and in between. We worked all of
                                            products, commodities, and resources                                                                            House and in the other body, have come to
                                                                                                     that out. It is easier to do when there
                                            nationwide.                                                                                                     recognize, along with the Administration, the
                                                                                                     is more money. So, this bill is going to
                                              Again, I want to thank the many co-                                                                           essential and indispensable strategic, national
                                                                                                     be good for large, medium, and small
                                            sponsors and the members of the Com-                                                                            defense and commercial importance of the
                                                                                                     ports, and emerging harbors. And just
                                            mittee on Transportation and Infra-                                                                             Arctic for our Nation’s future.
                                                                                                     to be parochial, it is going to be great
                                            structure for their hard work on this                    for my district.                                          The authorization of $490,919,000 for the
                                            very important bill.                                       We have many, many dangerous bar                     Arctic Deep Draft Port project in Nome in-
                                              Also, committee staff on both sides                    entrances. Fishers, particularly com-                  cluded in this bill has been a long time com-
                                            put a lot of work into this piece of leg-                mercial, sometimes recreational, die                   ing, and it is a positive step forward for Alaska
                                            islation, Mr. Speaker, and I want to                     there. The dredging needs are always                   and the country. The Port of Nome, due to its
                                            thank them all for their hard work.                      going to be there. Also, we have failing               geographic location, is a strategic transpor-
                                            Specifically, from the Subcommittee                      jetties that need replacement, so the                  tation hub that meets the needs of U.S. Arctic
                                            on Water Resources and Environment,                      additional cost share there will help.                 Policy by strengthening U.S. present in the re-
                                            the Republican staff, I want to thank                      Then an additional cost share by                     gion. The Port of Nome expansion is critical to




dlhill on DSK120RN23PROD with HOUSE
                                            Ian Bennitt, Jon Pawlow, and Victor                      statute for the Great Lakes, although I                ensure more effective search and rescue and
                                            Sarmiento. From the Democrat staff, I                    did talk with Ms. KAPTUR, and she feels                environmental response activities as vessel
                                            want to thank Ryan Seiger, Navis                         that we didn’t quite get it right. We                  traffic increases throughout the Arctic. The
                                            Bermudez, Camille Touton, and Alexa                      will work on that in conference.                       port will serve the country’s National interests
                                            Williams. From the Republican full                         I would like to thank staff: Ryan                    and support Coast Guard and Navy oper-
                                            committee staff, I want to thank Paul                    Seiger, who is chief counsel on the sub-               ations. It will also expand an existing logistics



                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00078   Fmt 4634   Sfmt 9920   E:\CR\FM\K29JY7.077   H29JYPT1
                                            July 29, 2020                                      CONGRESSIONAL RECORD — HOUSE                                                                       H3961
                                            hub for more than 50 Alaskan coastal commu-              equitable adjustments are added to the final           through the Bering Strait or docked tempo-
                                            nities to help reduce the cost of living and cre-        cost of a project and allocated between the            rarily in Nome.
                                            ate economic opportunity throughout Alaska               non-federal and USACE based on the cost-                  From 1866 to 1867, Port Clarence served
                                            and the Pacific Northwest.                               share formula.                                         as the forward operating base for the Western
                                               I want to commend the Army Corp’s Alaska                 The Army Corps has verbally informed the            Union Telegraph Expedition in the attempt to
                                            District, General Semonite and Assistant Sec-            Borough that 20 percent of this judgement ($4          link the continents with an undersea telegraph
                                            retary James for all their hard work to get the          million) may be allocated to the Borough’s fi-         cable.
                                            Chiefs report done in time for this bill. As a           nancial share of the project in the future. Nota-         Around 1884 it became the central summer
                                            former tugboat captain in Alaska, I know how             bly, the dispute had nothing to do with the            refitting port for the Arctic fleet, which usually
                                            important it is to have good ports, and I would          project’s design, engineering, or construction.        arrived in July and headed south around Sep-
                                            like to thank the Chairman and the Ranking               The dispute was instead focused on the man-            tember (unless they elected to overwinter
                                            Member for including this provision in the bill.         ner in which the USACE’s contracting officer           there).
                                               The bill also provides for the authorization of       sought to comply with a congressional direc-              The Port of Nome project and potential de-
                                            two other much needed projects to benefit                tive changing the manner in which the Corps            velopment Port Clarence/Point Spencer is po-
                                            Alaskan harbors. The bill authorizes a                   funded continuing contracts. Non-federal spon-         sitioned to become a key part of America’s
                                            $34,937,000 dredging project for Unalaska                sors, especially smaller rural communities,            deep-water Arctic Ports System, ready to re-
                                            Dutch Harbor. Dutch Harbor is one of the na-             should not be required to carry a significant          ceive and assist vessels moving to and from
                                            tion’s top fishing ports measured by catch vol-          share of the financial burden when there is a          Arctic destinations, trans-Arctic shipping, or
                                            ume and value and is essential to the Alaska             violation of procurement law peripheral to the         Navy and Coast Guard vessels and aircraft
                                            fishing economy and the nation’s food supply.            actual design, engineering, and construction of        undertaking a wide variety of missions from
                                            The project will dredge the entrance channel             the project itself.                                    those dealing with national security to eco-
                                            of the harbor to 58 feet improving the ability of           As many know one of my mottos is ‘‘Alaska           nomic development, search and rescue, ship-
                                            commercial, U.S. Coast Guard, U.S. Navy,                 to the future.’’ Looking ahead, as the only            ping safety, oil spill prevention, response and
                                            U.S. military assets and ships from allied na-           ‘‘Arctic State’’ in the Union, Alaska will play        clean up, arctic research, maritime law en-
                                            tions to utilize the harbor.                             the central role in hosting future arctic infra-       forcement on the Bering Sea, the Chukchi
                                               The bill also includes language to include            structure including as ‘‘System of Ports’’ and         Sea, and the Arctic Ocean.
                                            the authorization for St. George’s navigation            safe harbors as national security, government             The Congress authorized the transfer of cer-
                                            improvements project pending the timely re-              and commercial activities inevitably increase in       tain tracts of land at Point Spencer to Bering
                                            lease of a positive Chiefs Report from the               and around the Arctic in the coming years.             Straits Native Corporation (BSNC) while pro-
                                            Army Corps. The project will provide for the             The Army Corp’s Alaska Deep-Draft Arctic               viding the opportunity for retention of certain
                                            operability, safety and reliability of the St.           Port System Study and recent Defense De-               tracts by the USCG and the State of Alaska
                                            George Harbor as promised by the federal                 partment and U.S. Coast Guard strategic stud-          should the USCG and the State wish to retain
                                            government to aid the transition of the econ-            ies have shown that, U.S. strategic interests          those tracts. Port development at Point Spen-
                                            omy of the Pribilof Islands away from fur seals          will benefit from increased arctic infrastructure      cer-Port Clarence should proceed as a coop-
                                            to commercial fishing.                                   including port infrastructure to cover Alaska’s        erative effort among the State, the Federal
                                               Importantly, the bill makes an improvement            vast arctic land mass.                                 government, and BSNC in coordination with
                                            to the Tribal Partnership Program by increas-               What is needed, and what has been called            the enhancements of the Port of Nome.
                                            ing the per project federal cost share cap to            for, is a ‘‘System of U.S. Arctic Ports’’ whereby         Port Clarence has, historically been and will
                                            $15 million dollars from $12.5 million. This im-         the improvements at Nome should be the first           continue to be a valuable ‘‘Port of Refuge’’ be-
                                            provement is a step in the right direction and           in a series of needed improvements at other            cause of its naturally deep waters and natu-
                                            the increase begins to take into account the             key Alaska locations that will provide the             rally protected harbor—as shipping vessel traf-
                                            challenges Alaska faces with higher project              United States with the breadth of assets in-           fic continues to increase in the Arctic.
                                            costs. In forthcoming WRDA bills, I will con-            cluding a specialized Ports System for cov-               BSNC is working now with U.S. Corps of
                                            tinue to work with my colleagues and the                 erage and access to the Arctic.                        Engineers to place 30-ton and 60-ton indus-
                                            Committee to ensure that Corps policies re-                 One location that should warrant due con-           trial grade mooring system buoys at Port Clar-
                                            garding benefit-cost ratios, existing authorities        sideration for future improvements in an Arctic        ence to serve maritime safety needs for the
                                            and cost share requirements treat Alaska fairly          Ports System is Port Clarence/Point Spencer            entire Bering Strait Region.
                                            and take into account all the unique environ-            located immediately adjacent to the Bering                Mr. Speaker, I thank my colleagues Chair-
                                            mental challenges present in Alaska.                     Strait. Today’s U.S. year-round ice free ‘‘Arc-        man DEFAZIO and Ranking Member GRAVES
                                               As this bill moves into the Conference proc-          tic’’ ports are in Dutch Harbor, Adak, and St.         for their leadership in this unusually chal-
                                            ess, I will continue working with my colleagues          Paul, Alaska which play important roles be-            lenging time in the Congress and for our na-
                                            to include language, present in the Senate’s             cause of their locations. As ice navigability im-      tion by bringing this bipartisan Water Re-
                                            draft bill, that will protect nonfederal project         proves the natural and protected deep-water            sources Development Act legislation to the
                                            sponsors from shouldering cost liabilities in-           port of Port Clarence can serve as a year-             House Floor. I look forward to the positive im-
                                            curred by the Army Corps through no fault of             round potential forward service center and port        pact that WRDA 2020 will have on our na-
                                            their own. This language is needed for Project           of refuge close to, and directly adjacent to the       tion’s water resources development for dec-
                                            Cooperation Agreement in instances where                 key ‘‘choke point’’ of the Bering Strait.              ades to come.
                                            the Army Corps has been assessed a large                    The following is a brief overview of key in-           Mr. DESAULNIER. Mr. Speaker, I wish to
                                            adverse judgment by the Armed Services                   formation about this strategically located nat-        express my support of the Water Resources
                                            Board of Contract Appeals or another court of            ural deep-water port in the Arctic:                    Development Act. This strong, bipartisan bill
                                            competent jurisdiction.                                     Port Clarence is north-northwest of Nome            will help assure that our nation’s ports, har-
                                               In December 2018, the Aleutians East Bor-             (70 miles), on the Seward Peninsula, and is a          bors, and waterways are developed and main-
                                            ough was notified by the Army Corps that the             protected natural deep-water harbor. It is shel-       tained to enhance economic and environ-
                                            Armed Services Board of Contract Appeals                 tered by a long isthmus called Point Spencer.          mental vitality.
                                            had awarded Kelly-Ryan, Inc. a $20,000,000               Most recently, the U.S. Coast Guard based a               I am particularly pleased with the commit-
                                            judgement for a procurement dispute arising in           LORAN facility at Point Spencer with associ-           ment to beneficial reuse of dredged material
                                            2006–09 over the construction of a breakwater            ated power and an 8,000-foot airstrip (4,500           from Corps water resources projects. Dredged
                                            and other general navigation features in False           feet of paved runway and 3,500 feet of ex-             material is a valuable resource that can help
                                            Pass, Alaska. The standard Project Coopera-              tended gravel-covered runway).                         restore impacted shorelines and ecosystems
                                            tion Agreement between a non-federal project                Port Clarence’s protected harbor served In-         and that can create resilient coastlines and es-
                                            sponsor and the Corps for any Civil Works                digenous people of the region before contact           tuaries. Environmental groups in California
                                            project sets out the specific cost-sharing re-           with European cultures.                                have emphasized the importance of beneficial




dlhill on DSK120RN23PROD with HOUSE
                                            quirements applicable to the project. The                   Port Clarence served as a port of refuge for        reuse, specifically because the dredged mate-
                                            Agreement includes a definition of ‘‘total costs         whaling vessels in the mid-1850s while Alaska          rial can play a vital role in restoring and pre-
                                            of construction of the general navigation fea-           was under Russian sovereignty. It still serves         serving shallow water habitats such as tidal
                                            tures’’. This definition includes ‘‘the Govern-          as the Port of Refuge from storms for vessels,         marshes and mudflats. The beneficial use pilot
                                            ment’s costs of contract dispute settlements or          including U.S. Coast Guard vessels and other           program, first authorized in WRDA 2016, was
                                            awards’’. The costs of disputes, claims, and             government and commercial vessels travelling           so successful that H.R. 7575 increases the



                                      VerDate Sep 11 2014   15:44 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00079   Fmt 4634   Sfmt 9920   E:\CR\FM\A29JY7.047   H29JYPT1
                                            H3962                                              CONGRESSIONAL RECORD — HOUSE                                                                 July 29, 2020
                                            number of eligible projects. Notably, our own            this updated legislation will help to provide            The vote was taken by electronic de-
                                            San Francisco Bay estuary faces a number of              adequate water and wastewater infrastructure           vice, and there were—yeas 230, nays
                                            issues associated with resiliency and sustain-           to meet the demands, given the rapid pace of           181, not voting 19, as follows:
                                            ability, and the reuse of dredged material can           growth and development in our area. Further-                             [Roll No. 168]
                                            be enormously helpful in addressing these crit-          more, the bill will help in addressing mainte-
                                                                                                                                                                               YEAS—230
                                            ical issues around the Bay. In its report for            nance needs, replacing aging infrastructure,
                                                                                                                                                            Adams             Gomez             Omar
                                            WRDA 2020, the Committee highlighted Rich-               and help in accounting for human behavior in           Aguilar           Gonzalez (TX)     Pallone
                                            mond Outer Harbor, Pinole Shoal, and the                 all aspects of our water system—from sewer             Allred            Gottheimer        Panetta
                                            San Francisco Bay as priorities for consider-            overflows, to promoting water conservation             Axne              Green, Al (TX)    Pappas
                                            ation in the next round of pilot projects.               through drought tolerant outdoor landscaping.          Barragán         Grijalva          Pascrell
                                                                                                                                                            Bass              Haaland           Payne
                                               This year’s bill also highlights the role and            Lastly, I want to thank the committee for           Beatty            Harder (CA)       Perlmutter
                                            value of alternative dredging methods and                working with me to include language in the bill        Bera              Hastings          Peters
                                            equipment to beneficial reuse of dredged ma-             regarding the embankment of Lake Waco, on              Beyer             Hayes             Peterson
                                                                                                     which Lake Shore Drive is located, so that we          Bishop (GA)       Heck              Phillips
                                            terial. Specifically, I am encouraged that the                                                                  Blumenauer        Higgins (NY)
                                                                                                     may keep the public safe from danger. I un-                                                Pingree
                                            Committee clarifies that the use of alternative                                                                 Blunt Rochester   Himes             Pocan
                                            dredging methods and equipment must be                   derstand that there is also language in the            Bonamici          Horn, Kendra S.   Porter
                                            part of the overall beneficial use program. This         Senate bill on the Lakeshore Drive issue that          Boyle, Brendan    Horsford          Pressley
                                                                                                     may be more direct. As we move through                   F.              Houlahan          Price (NC)
                                            is important as, too often, we find that the old                                                                Brindisi          Hoyer
                                                                                                     completion of this bill in conference, I hope to                                           Quigley
                                            ways utilized by the Corps for maintaining                                                                      Brown (MD)        Huffman
                                                                                                                                                                                                Raskin
                                            navigation channels will not meet modem day              continue to work with the committee to ensure          Brownley (CA)     Jackson Lee
                                                                                                                                                                                                Rice (NY)
                                            demands to protect our natural resources and             that Lakeshore Drive is not a safety hazard.           Bustos            Jayapal
                                                                                                                                                                                                Richmond
                                                                                                        Mr. Speaker, the projects I just mentioned          Butterfield       Jeffries
                                            build a resilient future through reliable stra-                                                                                                     Rose (NY)
                                                                                                                                                            Carbajal          Johnson (GA)
                                            tegic management plans that allow annual                 are a tiny piece of the multitude of projects the      Cárdenas         Johnson (TX)      Rouda
                                                                                                     Army Corps of Engineers works on to help ad-           Carson (IN)       Kaptur            Roybal-Allard
                                            dredging.                                                                                                                                           Ruiz
                                               This bill will go a long way toward improving         dress the water needs of the United States             Cartwright        Keating
                                                                                                                                                                                                Ruppersberger
                                                                                                                                                            Case              Kelly (IL)
                                            our environment, providing much-needed di-               and its residents. Every American is impacted          Casten (IL)       Kennedy           Rush
                                            rection to the Army Corps, and supporting                by this legislation and I urge my colleagues to        Castor (FL)       Khanna            Ryan
                                                                                                     support it.                                            Castro (TX)       Kildee            Sánchez
                                            California’s 11th District.                                                                                                                         Sarbanes
                                               Ms. JOHNSON of Texas. Mr. Speaker, I rise                The SPEAKER pro tempore. The                        Chu, Judy         Kilmer
                                                                                                                                                            Cisneros          Kim               Scanlon
                                            in strong support of H.R. 7575, the Water Re-            question is on the motion offered by                                                       Schakowsky
                                                                                                                                                            Clark (MA)        Kind
                                            sources Development Act of 2020. I would like            the gentleman from Oregon (Mr. DEFA-                   Clarke (NY)       Kirkpatrick       Schiff
                                                                                                     ZIO) that the House suspend the rules                  Clay              Krishnamoorthi    Schneider
                                            to thank Chairman DEFazio and my fellow col-                                                                    Cleaver           Kuster (NH)       Schrader
                                            leagues on the House Transportation and In-              and pass the bill, H.R. 7575, as amend-
                                                                                                                                                            Clyburn           Lamb              Schrier
                                            frastructure Committee for their diligent work           ed.                                                    Cohen             Langevin          Scott (VA)
                                                                                                        The question was taken; and (two-                   Connolly          Larsen (WA)       Scott, David
                                            to produce this much needed water resources
                                                                                                     thirds being in the affirmative) the                   Cooper            Larson (CT)       Serrano
                                            bill. Everyone is the U.S. is impacted by the                                                                   Correa            Lawrence
                                                                                                     rules were suspended and the bill, as                                                      Sewell (AL)
                                            need for clean water and I believe this bill             amended, was passed.                                   Costa             Lawson (FL)       Shalala
                                            takes a giant step forward to ensuring this be-                                                                 Courtney          Lee (CA)          Sherman
                                                                                                        A motion to reconsider was laid on                  Cox (CA)          Lee (NV)          Sherrill
                                            comes a reality for every American.                      the table.                                             Craig             Levin (CA)        Sires
                                               Within my district, The City of Dallas is ap-                                                                Crist             Levin (MI)
                                                                                                                       f                                                                        Slotkin
                                            preciative to the U.S. Army Corps of Engi-                                                                      Crow              Lieu, Ted         Smith (WA)
                                            neers (Corps) for their funding of the Dallas                             RECESS                                Cuellar           Lipinski          Soto
                                                                                                                                                            Cunningham        Loebsack          Spanberger
                                            Floodway, Dallas Floodway Extension flood                  The SPEAKER pro tempore. Pursu-                      Davids (KS)       Lofgren           Speier
                                            risk management projects and Lewisville Dam              ant to clause 12(a) of rule I, the Chair               Davis (CA)        Lowenthal         Stanton
                                            repairs and their continued efforts to complete          declares the House in recess for a pe-                 Davis, Danny K.   Lowey             Stevens
                                            these projects quickly. I look forward to con-                                                                  Dean              Luján            Suozzi
                                                                                                     riod of less than 15 minutes.                          DeFazio           Luria
                                            tinuing to hear good reports on the progress of            Accordingly (at 3 o’clock and 12 min-                                                    Swalwell (CA)
                                                                                                                                                            DeGette           Lynch
                                                                                                                                                                                                Takano
                                            these projects. I am pleased that the Corps is           utes p.m.), the House stood in recess.                 DeLauro           Malinowski
                                                                                                                                                                                                Thompson (CA)
                                            moving forward with these projects.                                                                             DelBene           Maloney,
                                                                                                                       f                                    Delgado             Carolyn B.
                                                                                                                                                                                                Thompson (MS)
                                               Please allow me to note that it is helpful for                                                                                                   Titus
                                            the Corps to accept input from non-federal                                     b 1523                           Demings           Maloney, Sean
                                                                                                                                                                                                Tlaib
                                                                                                                                                            DeSaulnier        Matsui
                                                                                                                                                                                                Tonko
                                            sponsors in the development of WRDA guid-                           AFTER RECESS                                Deutch            McAdams
                                                                                                                                                                                                Torres (CA)
                                            ance. The Corps, working with local non-fed-                                                                    Dingell           McBath
                                                                                                       The recess having expired, the House                 Doggett           McCollum          Torres Small
                                            eral sponsors instead of developing guidance             was called to order by the Speaker pro                 Doyle, Michael    McEachin            (NM)
                                            independently, will result in more resilient                                                                      F.              McGovern          Trahan
                                                                                                     tempore (Mr. COURTNEY) at 3 o’clock                                                        Trone
                                            projects with multiple benefits. The role of re-                                                                Engel             McNerney
                                                                                                     and 23 minutes p.m.                                    Escobar           Meeks             Underwood
                                            siliency in the construction, operation and                                f                                    Eshoo             Meng              Vargas
                                            maintenance of projects carried out by the                                                                      Espaillat         Mfume             Veasey
                                            U.S. Army Corps of Engineers (Corps) must                PROVIDING FOR CONSIDERATION                            Evans             Moore             Vela
                                            continue to be a priority.                                 OF H.R. 7617, DEPARTMENT OF                          Finkenauer        Morelle           Velázquez
                                                                                                                                                            Fletcher          Moulton           Visclosky
                                               The Dallas area falls within the South-                 DEFENSE APPROPRIATIONS ACT,                                                              Wasserman
                                                                                                                                                            Foster            Mucarsel-Powell
                                            western Division of the Army Corps of Engi-                2021                                                 Frankel           Murphy (FL)         Schultz
                                            neers. Flooding and flood control continue to              The SPEAKER pro tempore. Pursu-                      Fudge             Nadler            Waters
                                                                                                                                                            Gabbard           Napolitano        Watson Coleman
                                            be issues that are ever-present on the minds             ant to clause 8 of rule XX, the unfin-                                                     Welch
                                                                                                                                                            Gallego           Neal
                                            of residents along the Trinity River. I have             ished business is the vote on ordering                 Garamendi         Neguse            Wexton
                                            held several meetings on flooding in the Dal-            the previous question on the resolution                Garcı́a (IL)      Norcross          Wild
                                            las area to address this issue and hope to               (H. Res. 1067) providing for consider-                 Garcia (TX)       O’Halleran        Wilson (FL)
                                                                                                                                                            Golden            Ocasio-Cortez     Yarmuth
                                            continue to work with the Corps to combat                ation of the bill (H.R. 7617) making ap-
                                            flooding in Dallas.                                      propriations for the Department of De-                                    NAYS—181
                                               Other parts of North Texas have also bene-            fense for the fiscal year ending Sep-                  Aderholt          Bergman           Bucshon
                                            fited from projects included in previous                 tember 30, 2021, and for other purposes,               Allen             Biggs             Budd
                                            versions of WRDA legislation. The projects ad-                                                                  Amash             Bilirakis         Burchett
                                                                                                     on which the yeas and nays were or-




dlhill on DSK120RN23PROD with HOUSE
                                                                                                                                                            Amodei            Bishop (NC)       Burgess
                                            dressing pump stations and levy heights in               dered.                                                 Armstrong         Bishop (UT)       Byrne
                                            Dallas, along with bridge projects in Ft. Worth            The Clerk read the title of the resolu-              Babin             Bost              Calvert
                                            would not be where they are today without the            tion.                                                  Bacon             Brady             Carter (GA)
                                                                                                       The SPEAKER pro tempore. The                         Baird             Brooks (AL)       Carter (TX)
                                            Corps and this legislation.                                                                                     Balderson         Brooks (IN)       Chabot
                                               Mr. Speaker, the Dallas-Fort Worth                    question is on ordering the previous                   Banks             Buchanan          Cheney
                                            metroplex is growing at a quite rapid pace and           question.                                              Barr              Buck              Cline




                                      VerDate Sep 11 2014   13:41 Jul 30, 2020   Jkt 099060   PO 00000   Frm 00080   Fmt 4634   Sfmt 0634   E:\CR\FM\A29JY7.048   H29JYPT1


File and source

File
CREC_crec-2020-07-29_crec-2020-07-29-pt1-pgh3927-2.pdf
Size
706,164 bytes
SHA-256
95923fcf20cefc4f71d7fca2e80c3e1891259e41e1aeb0dd92da2b64d45abe55
Our copy
CREC_crec-2020-07-29_crec-2020-07-29-pt1-pgh3927-2.pdf
Original
www.govinfo.gov
Back to top