Pandemic Darlings The pandemic economy, in original documents
Home Source documents S. 1811, Water Resources Development Act of 2020

S. 1811, Water Resources Development Act of 2020

Summary

S. 1811, the Water Resources Development Act of 2020, is the form of the Senate bill that the House of Representatives resolved on December 8, 2020 should pass with amendments. The resolution describes the bill as An Act to make technical corrections to the America’s Water Infrastructure Act of 2018, and for other purposes. The amendments strike out all after the enacting clause and insert new text, whose table of contents lists Title I, General Provisions. They also amend the title to read An Act to provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Bills Bills 116S1811Eah Bills 116S1811Eah
Case
Bills Bills 116S1811Eah Bills 116S1811Eah

Cite this document

“S. 1811, Water Resources Development Act of 2020.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/bills-bills-116s1811eah-bills-116s1811eah/, SHA-256 3f9fa0f70a8653d94ed7db8ea9c16d23006609797f75fc6bab8fedb6374df7fa.

Full text

In the House of Representatives, U. S.,
                                                          December 8, 2020.
     Resolved, That the bill from the Senate (S. 1811) enti-
tled ‘‘An Act to make technical corrections to the America’s
Water Infrastructure Act of 2018, and for other purposes.’’,
do pass with the following

                       AMENDMENTS:
            Strike out all after the enacting clause and insert:

 1   SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

 2          (a) SHORT TITLE.—This Act may be cited as the
 3 ‘‘Water Resources Development Act of 2020’’.
 4          (b) TABLE OF CONTENTS.—The table of contents for
 5 this Act is as follows:
     Sec. 1. Short title; table of contents.
     Sec. 2. Secretary defined.

                            TITLE I—GENERAL PROVISIONS

     Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Mainte-
                       nance Trust Fund.
     Sec. 102. Authorization of appropriations for navigation.
     Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund.
     Sec. 104. Additional measures at donor ports and energy transfer ports.
     Sec. 105. Construction of water resources development projects by non-Federal in-
                       terests.
     Sec. 106. Coast Guard anchorages.
     Sec. 107. State contribution of funds for certain operation and maintenance costs.
     Sec. 108. Great Lakes confined disposal facilities.
     Sec. 109. Inland waterway projects.
     Sec. 110. Implementation of water resources principles and requirements.
     Sec. 111. Resiliency planning assistance.
     Sec. 112. Project consultation.
     Sec. 113. Review of resiliency assessments.
     Sec. 114. Small flood control projects.
     Sec. 115. Flood Protection Projects.
                                     2
Sec. 116. Feasibility studies; review of natural and nature-based features.
Sec. 117. Federal interest determination.
Sec. 118. Pilot programs on the formulation of Corps of Engineers projects in
                  rural communities and economically disadvantaged commu-
                  nities.
Sec. 119. Permanent measures to reduce emergency flood fighting needs for com-
                  munities subject to repetitive flooding.
Sec. 120. Emergency response to natural disasters.
Sec. 121. Cost and benefit feasibility assessment.
Sec. 122. Expediting repairs and recovery from flooding.
Sec. 123. Review of Corps of Engineers assets.
Sec. 124. Sense of Congress on multipurpose projects.
Sec. 125. Beneficial use of dredged material; dredged material management plans.
Sec. 126. Aquatic ecosystem restoration for anadromous fish.
Sec. 127. Annual report to Congress on water resources infrastructure.
Sec. 128. Harmful algal bloom demonstration program.
Sec. 129. Missouri River interception-rearing complex construction.
Sec. 130. Materials, services, and funds for repair, restoration, or rehabilitation
                  of projects.
Sec. 131. Levee safety.
Sec. 132. National Dam Safety Program.
Sec. 133. Rehabilitation of Corps of Engineers constructed pump stations.
Sec. 134. Non-Federal Project Implementation Pilot Program.
Sec. 135. Cost sharing provisions for territories and Indian Tribes.
Sec. 136. Review of contracting policies.
Sec. 137. Criteria for funding environmental infrastructure projects.
Sec. 138. Aging infrastructure.
Sec. 139. Uniformity of notification systems.
Sec. 140. Coastal storm damage reduction contracts.
Sec. 141. Dam remediation for ecosystem restoration.
Sec. 142. Levee accreditation process; levee certifications.
Sec. 143. Project partnership agreement.
Sec. 144. Acceptance of funds for harbor dredging.
Sec. 145. Replacement capacity.
Sec. 146. Reviewing hydropower at Corps of Engineers facilities.
Sec. 147. Repair and restoration of embankments.
Sec. 148. Coastal mapping.
Sec. 149. Interim risk reduction measures.
Sec. 150. Maintenance dredging permits.
Sec. 151. High water-low water preparedness.
Sec. 152. Treatment of certain benefits and costs.
Sec. 153. Lease deviations.
Sec. 154. Sense of Congress on Arctic deep draft port development.
Sec. 155. Small water storage projects.
Sec. 156. Planning Assistance to States.
Sec. 157. Forecast-informed reservoir operations.
Sec. 158. Data for water allocation, supply, and demand.
Sec. 159. Inland waterways pilot program.
Sec. 160. Definition of economically disadvantaged community.
Sec. 161. Studies of water resources development projects by non-Federal interests.
Sec. 162. Leveraging Federal infrastructure for increased water supply.
Sec. 163. Sense of Congress on removal of unauthorized, manmade, flammable
                  materials on Corps property.
Sec. 164. Enhanced development program.
Sec. 165. Continuing authority programs.

  •S 1811 EAH
                                    3
                   TITLE II—STUDIES AND REPORTS

Sec. 201. Authorization of proposed feasibility studies.
Sec. 202. Expedited completions.
Sec. 203. Expedited modifications of existing feasibility studies.
Sec. 204. Assistance to non-Federal sponsors; feasibility analysis.
Sec. 205. Selma, Alabama.
Sec. 206. Report on Corps of Engineers facilities in Appalachia.
Sec. 207. Additional studies under North Atlantic Coast Comprehensive Study.
Sec. 208. South Atlantic coastal study.
Sec. 209. Comprehensive study of the Sacramento River, Yolo Bypass, California.
Sec. 210. Lake Okeechobee regulation schedule, Florida.
Sec. 211. Great Lakes coastal resiliency study.
Sec. 212. Report on the status of restoration in the Louisiana coastal area.
Sec. 213. Lower Mississippi River comprehensive management study.
Sec. 214. Upper Mississippi River Comprehensive Plan.
Sec. 215. Upper Missouri River Basin mainstem dam fish loss research.
Sec. 216. Lower and Upper Missouri River Comprehensive Flood Protection.
Sec. 217. Portsmouth Harbor and Piscataqua River and Rye Harbor, New
                 Hampshire.
Sec. 218. Cougar and Detroit Dams, Willamette River Basin, Oregon.
Sec. 219. Port Orford, Oregon.
Sec. 220. Wilson Creek and Sloan Creek, Fairview, Texas.
Sec. 221. Study on water supply and water conservation at water resources devel-
                 opment projects.
Sec. 222. Report to Congress on authorized studies and projects.
Sec. 223. Completion of reports and materials.
Sec. 224. Emergency flooding protection for lakes.
Sec. 225. Report on debris removal.
Sec. 226. Report on antecedent hydrologic conditions.
Sec. 227. Subsurface drain systems research and development.
Sec. 228. Report on corrosion prevention activities.
Sec. 229. Annual reporting on dissemination of information.
Sec. 230. Report on benefits calculation for flood control structures.

        TITLE III—DEAUTHORIZATIONS AND MODIFICATIONS
Sec. 301. Deauthorization of inactive projects.
Sec. 302. Abandoned and inactive noncoal mine restoration.
Sec. 303. Tribal partnership program.
Sec. 304. Lakes program.
Sec. 305. Rehabilitation of Corps of Engineers constructed dams.
Sec. 306. Chesapeake Bay Environmental Restoration and Protection Program.
Sec. 307. Upper Mississippi River System Environmental Management Program.
Sec. 308. Upper Mississippi River protection.
Sec. 309. Theodore Ship Channel, Mobile, Alabama.
Sec. 310. McClellan-Kerr Arkansas River Navigation System.
Sec. 311. Ouachita and Black Rivers, Arkansas and Louisiana.
Sec. 312. Lake Isabella, California.
Sec. 313. Lower San Joaquin River flood control project.
Sec. 314. Sacramento River, Glenn-Colusa, California.
Sec. 315. San Diego River and Mission Bay, San Diego County, California.
Sec. 316. San Francisco, California, Waterfront Area.
Sec. 317. Western Pacific Interceptor Canal, Sacramento River, California.
Sec. 318. Rio Grande Environmental Management Program, Colorado, New Mex-
                 ico, and Texas.

  •S 1811 EAH
                                    4
Sec. 319. New London Harbor Waterfront Channel, Connecticut.
Sec. 320. Wilmington Harbor, Delaware.
Sec. 321. Wilmington Harbor South Disposal Area, Delaware.
Sec. 322. Washington Harbor, District of Columbia.
Sec. 323. Big Cypress Seminole Indian Reservation Water Conservation Plan,
                  Florida.
Sec. 324. Central Everglades, Florida.
Sec. 325. Miami River, Florida.
Sec. 326. Julian Keen, Jr. Lock and Dam, Moore Haven, Florida.
Sec. 327. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns
                  River Basin, Florida.
Sec. 328. Extinguishment of flowage easements, Rough River Lake, Kentucky.
Sec. 329. Calcasieu River and Pass, Louisiana.
Sec. 330. Camden Harbor, Maine.
Sec. 331. Cape Porpoise Harbor, Maine, anchorage area designation.
Sec. 332. Baltimore, Maryland.
Sec. 333. Thad Cochran Lock and Dam, Amory, Mississippi.
Sec. 334. Missouri river reservoir sediment management.
Sec. 335. Portsmouth, New Hampshire.
Sec. 336. Rahway flood risk management feasibility study, New Jersey.
Sec. 337. San Juan-Chama project; Abiquiu Dam, New Mexico.
Sec. 338. Flushing Bay and Creek Federal Navigation Channel, New York.
Sec. 339. Rush River and Lower Branch Rush River, North Dakota.
Sec. 340. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode
                  Island and Connecticut.
Sec. 341. Harris County, Texas.
Sec. 342. Cap Sante Waterway, Washington.
Sec. 343. Local government reservoir permit review.
Sec. 344. Project modifications for improvement of environment.
Sec. 345. Aquatic ecosystem restoration.
Sec. 346. Surplus water contracts and water storage agreements.
Sec. 347. No wake zones in navigation channels.
Sec. 348. Limitation on contract execution in the Arkansas River Basin.
Sec. 349. Waiver of non-Federal share of damages related to certain contract
                  claims.
Sec. 350. Reduced pricing for certain water supply storage.
Sec. 351. Flood control and other purposes.
Sec. 352. Additional assistance for critical projects.
Sec. 353. Project modification authorizations.
Sec. 354. Completion of maintenance and repair activities.
Sec. 355. Project reauthorizations.
Sec. 356. Conveyances.
Sec. 357. Lake Eufaula advisory committee.
Sec. 358. Repeal of Missouri River Task Force, North Dakota.
Sec. 359. Repeal of Missouri River Task Force, South Dakota.
Sec. 360. Conforming amendments.

          TITLE IV—WATER RESOURCES INFRASTRUCTURE

Sec. 401. Project authorizations.
Sec. 402. Special rules.
Sec. 403. Authorization of projects based on feasibility studies prepared by non-
                  Federal interests.




  •S 1811 EAH
                                         5
                             TITLE V—OTHER MATTERS

     Sec. 501. Update on Invasive Species Policy Guidance.
     Sec. 502. Aquatic invasive species research.
     Sec. 503. Terrestrial noxious weed control pilot program.
     Sec. 504. Invasive species risk assessment, prioritization, and management.
     Sec. 505. Invasive species mitigation and reduction.
     Sec. 506. Aquatic invasive species prevention.
     Sec. 507. Invasive species in alpine lakes pilot program.
     Sec. 508. Murder hornet eradication pilot program.
     Sec. 509. Asian carp prevention and control pilot program.
     Sec. 510. Invasive species in noncontiguous States and territories pilot program.
     Sec. 511. Soil moisture and snowpack monitoring.
     Sec. 512. Great Lakes St. Lawrence Seaway Development Corporation.
     Sec. 513. Determination of budgetary effects.

 1   SEC. 2. SECRETARY DEFINED.

 2         In this Act, the term ‘‘Secretary’’ means the Secretary
 3 of the Army.
 4    TITLE I—GENERAL PROVISIONS
 5   SEC. 101. BUDGETARY TREATMENT EXPANSION AND AD-

 6                     JUSTMENT FOR THE HARBOR MAINTENANCE

 7                     TRUST FUND.

 8         (a) IN GENERAL.—Section 14003 of division B of the
 9 CARES Act (Public Law 116–136) is amended to read as
10 follows:
11         ‘‘SEC. 14003. Section 251(b)(2) of the Balanced Budget
12 and Emergency Deficit Control Act of 1985 (2 U.S.C.
13 901(b)(2)) is amended by adding at the end the following:
14                       ‘‘ ‘(H)     HARBOR          MAINTENANCE            ACTIVI-

15                TIES.—If, for any fiscal year, appropriations for

16                the Construction, Mississippi River and Tribu-
17                taries, and Operation and Maintenance accounts
18                of the Corps of Engineers are enacted that are


       •S 1811 EAH
                                6
1            derived from the Harbor Maintenance Trust
2            Fund established under section 9505(a) of the In-
3            ternal Revenue Code of 1986 and that the Con-
4            gress designates in statute as being for harbor
5            operations and maintenance activities, then the
6            adjustment for that fiscal year shall be the total
7            of such appropriations that are derived from
8            such Fund and designated as being for harbor
9            operations and maintenance activities, but shall
10           not exceed the sum of—
11                      ‘‘ ‘(i) the amount deposited into the
12                 Harbor Maintenance Trust Fund in the fis-
13                 cal year that is two years prior to the fiscal
14                 year for which the adjustment is being
15                 made; and
16                      ‘‘ ‘(ii) $2,000,000,000.
17                 ‘‘ ‘(I) CERTAIN HARBOR MAINTENANCE AC-
18           TIVITIES.—If,     for any of fiscal years 2021
19           through 2030, appropriations for the Operation
20           and Maintenance account of the Corps of Engi-
21           neers are enacted that the Congress designates in
22           statute as being to carry out subsection (c) of sec-
23           tion 2106 of the Water Resources Reform and
24           Development Act of 2014 (33 U.S.C. 2238c), then
25           the adjustment for that fiscal year shall be the


     •S 1811 EAH
                                     7
 1            total of such appropriations for that fiscal year
 2            designated as being to carry out such subsection,
 3            but shall not exceed—
 4                         ‘‘ ‘(i) $50,000,000 for fiscal year 2021;
 5                         ‘‘ ‘(ii) $50,000,000 for fiscal year 2022;
 6                         ‘‘ ‘(iii) $56,000,000 for fiscal year
 7                   2023;
 8                         ‘‘ ‘(iv) $58,000,000 for fiscal year 2024;
 9                         ‘‘ ‘(v) $60,000,000 for fiscal year 2025;
10                         ‘‘ ‘(vi) $62,000,000 for fiscal year 2026;
11                         ‘‘ ‘(vii) $64,000,000 for fiscal year
12                   2027;
13                         ‘‘ ‘(viii) $66,000,000 for fiscal year
14                   2028;
15                         ‘‘ ‘(ix) $68,000,000 for fiscal year 2029;
16                   and
17                         ‘‘ ‘(x)   $70,000,000   for   fiscal   year
18                   2030.’.’’.
19       (b) EFFECTIVE DATE.—The amendment made by sub-
20 section (a) shall take effect as if included in the enactment
21 of the CARES Act (Public Law 116–136).
22   SEC. 102. AUTHORIZATION OF APPROPRIATIONS FOR NAVI-

23                  GATION.

24       (a) AUTHORIZATION.—




      •S 1811 EAH
                                     8
 1            (1) IN GENERAL.—In carrying out subsection (c)
 2      of section 210 of the Water Resources Development
 3      Act of 1986 (33 U.S.C. 2238), for each fiscal year, of
 4      the funds made available under such section (includ-
 5      ing funds appropriated from the Harbor Maintenance
 6      Trust Fund), the Secretary is authorized to make ex-
 7      penditures to pay for operation and maintenance
 8      costs of the harbors and inland harbors referred to in
 9      subsection (a)(2) of such section, to the extent there
10      are identifiable operations and maintenance needs,
11      of—
12                 (A) not less than 15 percent of such funds
13            for emerging harbor projects, including eligible
14            breakwater and jetty needs at such harbor
15            projects;
16                 (B) not less than 13 percent of such funds
17            for projects that are located within the Great
18            Lakes Navigation System;
19                 (C) 12 percent of such funds for expanded
20            uses carried out at donor ports and energy
21            transfer ports, of which—
22                        (i)   13
                                ⁄        shall be provided to energy
23                 transfer ports; and
24                        (ii) 2⁄3 shall be provided to donor ports;




     •S 1811 EAH
                              9
 1                 (D) not less than 17 percent of such funds
 2           for projects that are assigned to commercial stra-
 3           tegic seaports; and
 4                 (E) any remaining funds for operation and
 5           maintenance costs of any harbor or inland har-
 6           bor referred to in such subsection (a)(2) based on
 7           an equitable allocation of such funds among such
 8           harbors and inland harbors, in accordance with
 9           subsection (c)(1) of such section 210.
10           (2) DEFINITIONS.—In this subsection:
11                 (A) COMMERCIAL     STRATEGIC SEAPORT.—

12           The term ‘‘commercial strategic seaport’’ means
13           a commercial harbor supporting the coordination
14           of efficient port operations during peacetime and
15           national defense emergencies that is designated
16           as strategic through the National Port Readiness
17           Network.
18                 (B)   DONOR     PORT;   ENERGY     TRANSFER

19           PORT.—The     terms ‘‘donor port’’ and ‘‘energy
20           transfer port’’ have the meanings given those
21           terms in section 2106 of the Water Resources Re-
22           form and Development Act of 2014 (33 U.S.C.
23           2238c).
24                 (C) EMERGING HARBOR PROJECT; GREAT
25           LAKES NAVIGATION SYSTEM.—The terms ‘‘emerg-



     •S 1811 EAH
                               10
 1           ing harbor project’’ and ‘‘Great Lakes Naviga-
 2           tion System’’ have the meanings given those
 3           terms in section 210 of the Water Resources De-
 4           velopment Act of 1986 (33 U.S.C. 2238).
 5           (3) EFFECTIVE DATE.—This subsection shall take
 6      effect on October 1, 2022.
7       (b) ADDITIONAL USES.—
 8           (1) OPERATION AND MAINTENANCE OF HARBOR
 9      PROJECTS.—Section 210(c)(3) of the Water Resources

10      Development Act of 1986 (33 U.S.C. 2238(c)(3)) is
11      amended—
12                 (A) by striking ‘‘Notwithstanding’’ and in-
13           serting the following:
14                 ‘‘(A) ALLOCATION.—Notwithstanding’’; and
15                 (B) by adding at the end the following:
16                 ‘‘(B) ADDITIONAL USES AT EMERGING HAR-
17           BORS.—

18                      ‘‘(i) USES.—In each fiscal year, the
19                 Secretary   may     use   not    more     than
20                 $5,000,000 of funds allocated for emerging
21                 harbor projects under paragraph (1) to pay
22                 for the costs of up to 10 projects for mainte-
23                 nance dredging of a marina or berthing
24                 area, in an emerging harbor, that includes
25                 an area that is located adjacent to, or is ac-


     •S 1811 EAH
                                  11
 1                 cessible by, a Federal navigation project,
 2                 subject to clauses (ii) and (iii) of this sub-
 3                 paragraph.
 4                      ‘‘(ii) ELIGIBLE EMERGING HARBORS.—
 5                 The Secretary may use funds as authorized
 6                 under clause (i) at an emerging harbor
 7                 that—
 8                            ‘‘(I) supports commercial activi-
 9                      ties, including commercial fishing op-
10                      erations, commercial fish processing
11                      operations, recreational and sport fish-
12                      ing, and commercial boat yards; or
13                            ‘‘(II) supports activities of the
14                      Secretary of the department in which
15                      the Coast Guard is operating.
16                      ‘‘(iii)        COST-SHARING     REQUIRE-

17                 MENTS.—The Secretary shall require a non-

18                 Federal interest to contribute not less than
19                 25 percent of the costs for maintenance
20                 dredging of that portion of a maintenance
21                 dredging project described in clause (i) that
22                 is located outside of the Federal navigation
23                 project, which may be provided as an in-
24                 kind contribution, including through the use




     •S 1811 EAH
                                12
 1                 of dredge equipment owned by non-Federal
 2                 interest to carry out such activities.’’.
3            (2) ASSESSMENT OF HARBORS AND INLAND HAR-
 4      BORS.—Section       210(e)(2)(A)(ii) of the Water Re-
 5      sources    Development       Act   of   1986   (33     U.S.C.
 6      2238(e)(2)(A)(ii)) is amended by inserting ‘‘uses de-
 7      scribed in subsection (c)(3)(B) and’’ after ‘‘costs for’’.
 8           (3) DEFINITIONS.—Section 210(f) of the Water
 9      Resources Development Act of 1986 (33 U.S.C.
10      2238(f)) is amended—
11                 (A) by striking paragraph (6);
12                 (B)     by   redesignating     paragraphs      (3)
13           through (5) as paragraphs (4) through (6), re-
14           spectively;
15                 (C) by striking paragraph (2) and inserting
16           the following:
17           ‘‘(2) EMERGING HARBOR.—The term ‘emerging
18      harbor’ means a harbor or inland harbor referred to
19      in subsection (a)(2) that transits less than 1,000,000
20      tons of cargo annually.
21           ‘‘(3) EMERGING HARBOR PROJECT.—The term
22      ‘emerging harbor project’ means a project that is as-
23      signed to an emerging harbor.’’; and
24                 (D) in paragraph (4) (as so redesignated),
25           by adding at the end the following:


     •S 1811 EAH
                                 13
 1                   ‘‘(C) An in-water improvement, if the im-
 2            provement—
 3                        ‘‘(i) is for the seismic reinforcement of
 4                   a wharf or other berthing structure, or the
 5                   repair or replacement of a deteriorating
 6                   wharf or other berthing structure, at a port
 7                   facility;
 8                        ‘‘(ii) benefits commercial navigation at
 9                   the harbor; and
10                        ‘‘(iii) is located in, or adjacent to, a
11                   berth that is accessible to a Federal naviga-
12                   tion project.
13                   ‘‘(D) An activity to maintain slope stability
14            at a berth in a harbor that is accessible to a Fed-
15            eral navigation project if such activity benefits
16            commercial navigation at the harbor.’’.
17   SEC. 103. ANNUAL REPORT TO CONGRESS ON THE HARBOR

18                  MAINTENANCE TRUST FUND.

19       Section 330 of the Water Resources Development Act
20 of 1992 (26 U.S.C. 9505 note; 106 Stat. 4851) is amended—
21            (1) in subsection (a)—
22                   (A) by striking ‘‘and annually thereafter,’’
23            and inserting ‘‘and annually thereafter concur-
24            rent with the submission of the President’s an-
25            nual budget request to Congress,’’; and


      •S 1811 EAH
                                 14
 1                    (B) by striking ‘‘Public Works and Trans-
 2            portation’’ and inserting ‘‘Transportation and
 3            Infrastructure’’; and
 4            (2) in subsection (b)(1) by adding at the end the
 5       following:
 6                    ‘‘(D) A description of the expected expendi-
 7            tures from the trust fund to meet the needs of
 8            navigation for the fiscal year of the budget re-
 9            quest.’’.
10   SEC. 104. ADDITIONAL MEASURES AT DONOR PORTS AND

11                  ENERGY TRANSFER PORTS.

12       (a) INTERIM AUTHORIZATION.—Section 2106(f) of the
13 Water Resources Reform and Development Act of 2014 (33
14 U.S.C. 2238c(f)) is amended—
15            (1) in paragraph (1), by striking ‘‘2020’’ and in-
16       serting ‘‘2022’’; and
17            (2) by striking paragraph (3).
18       (b) IN GENERAL.—
19            (1) DEFINITIONS.—Section 2106(a) of the Water
20       Resources Reform and Development Act of 2014 (33
21       U.S.C. 2238c(a)) is amended—
22                    (A) in paragraph (3)(A)—
23                         (i) by amending clause (ii) to read as
24                    follows:




      •S 1811 EAH
                               15
 1                      ‘‘(ii) at which the total amount of har-
 2                 bor maintenance taxes collected (including
 3                 the estimated taxes related to domestic cargo
 4                 and cruise passengers) comprise not less
 5                 than $15,000,000 annually of the total
 6                 funding of the Harbor Maintenance Trust
 7                 Fund on an average annual basis for the
 8                 previous 3 fiscal years;’’;
 9                      (ii) in clause (iii)—
10                            (I) by inserting ‘‘(including the
11                      estimated taxes related to domestic
12                      cargo and cruise passengers)’’ after
13                      ‘‘taxes collected’’; and
14                            (II) by striking ‘‘5 fiscal years’’
15                      and inserting ‘‘3 fiscal years’’; and
16                      (iii) in clause (iv), by striking ‘‘in fis-
17                 cal year 2012’’ and inserting ‘‘on an aver-
18                 age annual basis for the previous 3 fiscal
19                 years’’;
20                 (B) in paragraph (5)(B), by striking ‘‘in
21           fiscal year 2012’’ each place it appears and in-
22           serting ‘‘on an average annual basis for the pre-
23           vious 3 fiscal years’’;




     •S 1811 EAH
                                  16
1                  (C) by redesignating paragraph (8) as
2            paragraph (9) and inserting after paragraph (7)
3            the following:
 4           ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—The
 5      term ‘Harbor Maintenance Trust Fund’ means the
 6      Harbor Maintenance Trust Fund established by sec-
 7      tion 9505 of the Internal Revenue Code of 1986.’’; and
 8                 (D) in paragraph (9), as so redesignated—
 9                      (i) by amending subparagraph (B) to
10                 read as follows:
11                 ‘‘(B) at which the total amount of harbor
12           maintenance taxes collected (including the esti-
13           mated taxes related to domestic cargo and cruise
14           passengers)        comprise   annually   more    than
15           $5,000,000 but less than $15,000,000 of the total
16           funding of the Harbor Maintenance Trust Fund
17           on an average annual basis for the previous 3
18           fiscal years;’’;
19                      (ii) in subparagraph (C)—
20                              (I) by inserting ‘‘(including the
21                      estimated taxes related to domestic
22                      cargo and cruise passengers)’’ after
23                      ‘‘taxes collected’’; and
24                              (II) by striking ‘‘5 fiscal years’’
25                      and inserting ‘‘3 fiscal years’’; and


     •S 1811 EAH
                                  17
1                       (iii) in subparagraph (D), by striking
2                  ‘‘in fiscal year 2012’’ and inserting ‘‘on an
3                  average annual basis for the previous 3 fis-
4                  cal years’’.
5            (2) REPORT TO CONGRESS; AUTHORIZATION OF
 6      APPROPRIATIONS.—Section        2106 of the Water Re-
 7      sources Reform and Development Act of 2014 (33
 8      U.S.C. 2238c) is amended—
 9                 (A) by striking subsection (e) and redesig-
10           nating subsections (f) and (g) as subsections (e)
11           and (f), respectively; and
12                 (B) in subsection (e), as so redesignated, by
13           amending paragraph (1) to read as follows:
14           ‘‘(1) IN GENERAL.—There are authorized to be
15      appropriated to carry out this section—
16                 ‘‘(A) $56,000,000 for fiscal year 2023;
17                 ‘‘(B) $58,000,000 for fiscal year 2024;
18                 ‘‘(C) $60,000,000 for fiscal year 2025;
19                 ‘‘(D) $62,000,000 for fiscal year 2026;
20                 ‘‘(E) $64,000,000 for fiscal year 2027;
21                 ‘‘(F) $66,000,000 for fiscal year 2028;
22                 ‘‘(G) $68,000,000 for fiscal year 2029; and
23                 ‘‘(H) $70,000,000 for fiscal year 2030.’’.
24           (3) EFFECTIVE DATE.—The amendments made
25      by this subsection shall take effect on October 1, 2022.


     •S 1811 EAH
                                  18
 1   SEC. 105. CONSTRUCTION OF WATER RESOURCES DEVELOP-

 2                  MENT PROJECTS BY NON-FEDERAL INTER-

 3                  ESTS.

 4       (a) STUDIES AND ENGINEERING.—Section 204(c)(1) of
 5 the Water Resources Development Act of 1986 (33 U.S.C.
 6 2232(c)(1)) is amended by striking ‘‘under subsection (b)’’
 7 and inserting ‘‘under this section’’.
 8       (b) ASSUMPTION OF MAINTENANCE OF A LOCALLY
 9 PREFERRED PLAN.—Section 204(f) of the Water Resources
10 Development Act of 1986 (33 U.S.C. 2232(f)) is amended
11 to read as follows:
12       ‘‘(f) OPERATION AND MAINTENANCE.—
13            ‘‘(1) ASSUMPTION OF MAINTENANCE.—Whenever
14       a non-Federal interest carries out improvements to a
15       federally authorized harbor or inland harbor, the Sec-
16       retary shall be responsible for operation and mainte-
17       nance in accordance with section 101(b) if—
18                   ‘‘(A) before construction of the improve-
19            ments—
20                          ‘‘(i) the Secretary determines that the
21                   improvements are feasible and consistent
22                   with the purposes of this title; and
23                          ‘‘(ii) the Secretary and the non-Federal
24                   interest execute a written agreement relat-
25                   ing to operation and maintenance of the
26                   improvements;
      •S 1811 EAH
                                19
 1                  ‘‘(B) the Secretary certifies that the project
 2            or separable element of the project is constructed
 3            in accordance with applicable permits and ap-
 4            propriate engineering and design standards; and
 5                  ‘‘(C) the Secretary does not find that the
 6            project or separable element is no longer feasible.
 7            ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN THE
 8       COSTS OF A LOCALLY PREFERRED PLAN.—In the case

 9       of improvements determined by the Secretary pursu-
10       ant to paragraph (1)(A)(i) to deviate from the na-
11       tional economic development plan, the Secretary shall
12       be responsible for all operation and maintenance costs
13       of such improvements, as described in section 101(b),
14       including costs in excess of the costs of the national
15       economic development plan, if the Secretary deter-
16       mines that the improvements satisfy the requirements
17       of paragraph (1).’’.
18       (c) REPORT.—A non-Federal interest may submit to
19 the Secretary a report on improvements to a federally au-
20 thorized harbor or inland harbor to be carried out by the
21 non-Federal interest, containing any information necessary
22 for the Secretary determine whether the improvements sat-
23 isfy the requirements of section 204(f)(1) of the Water Re-
24 sources Development Act of 1986 (33 U.S.C. 2232), includ-
25 ing—


      •S 1811 EAH
                              20
 1            (1) the economic justification for the improve-
 2       ments;
 3            (2) details of the project improvement plan and
 4       design;
 5            (3) proposed arrangements for the work to be
 6       performed; and
 7            (4) documents relating to any applicable permits
 8       required for the project improvements.
 9       (d) PROJECT STUDIES SUBJECT TO INDEPENDENT
10 PEER REVIEW.—The Secretary shall not be required to sub-
11 ject a project study for a project with a cost of less than
12 $200,000,000, which the Secretary determines satisfies the
13 requirements of section 204(f)(1) of the Water Resources De-
14 velopment Act of 1986 (33 U.S.C. 2232), to independent
15 peer review under section 2034(a)(3)(A)(i) of the Water Re-
16 sources     Development    Act   of    2007     (33   U.S.C.
17 2343(a)(3)(A)(i)).
18   SEC. 106. COAST GUARD ANCHORAGES.

19       The Secretary may perform dredging at Federal ex-
20 pense within and adjacent to anchorages established by the
21 Coast Guard pursuant to existing authorities.
22   SEC. 107. STATE CONTRIBUTION OF FUNDS FOR CERTAIN

23                  OPERATION AND MAINTENANCE COSTS.

24       In carrying out eligible operations and maintenance
25 activities within the Great Lakes Navigation System pursu-


      •S 1811 EAH
                              21
 1 ant to section 210 of the Water Resources Development Act
 2 of 1986 (33 U.S.C. 2238) in a State that has implemented
 3 any additional State limitation on the disposal of dredged
 4 material in the open waters of such State, the Secretary
 5 may, pursuant to section 5 of the Act of June 22, 1936
 6 (33 U.S.C. 701h), receive from such State, and expend, such
 7 funds as may be contributed by the State to cover the addi-
 8 tional costs for operations and maintenance activities for
 9 a harbor or inland harbor within such State that result
10 from such limitation.
11   SEC. 108. GREAT LAKES CONFINED DISPOSAL FACILITIES.

12       (a) MITIGATION.—The Secretary may relocate access
13 to the Port of Cleveland confined disposal facility, owned
14 or operated by a non-Federal interest, in which material
15 dredged by the Corps of Engineers is placed.
16       (b) COST-SHARE.—The cost to relocate access to the
17 confined disposal facility described in subsection (a) shall
18 be shared in accordance with the cost share applicable to
19 operation and maintenance of the Federal navigation
20 project from which material placed in the confined disposal
21 facility is dredged.
22       (c) TERMINATION.—The authority provided under this
23 section shall terminate on December 31, 2024.




      •S 1811 EAH
                                22
 1   SEC. 109. INLAND WATERWAY PROJECTS.

 2       Notwithstanding section 102 of the Water Resources
 3 Development Act of 1986 (33 U.S.C. 2212), for a project
 4 for navigation on the inland waterways receiving a con-
 5 struction appropriation during any of fiscal years 2021
 6 through 2031, 35 percent of the costs of construction of the
 7 project shall be paid from amounts appropriated from the
 8 Inland Waterways Trust Fund until such construction of
 9 the project is complete.
10   SEC. 110. IMPLEMENTATION OF WATER RESOURCES PRIN-

11                  CIPLES AND REQUIREMENTS.

12       (a) IN GENERAL.—Not later than 180 days after the
13 date of enactment of this Act, the Secretary shall issue final
14 agency-specific procedures necessary to implement the prin-
15 ciples and requirements and the interagency guidelines.
16       (b) DEVELOPMENT OF FUTURE WATER RESOURCES
17 DEVELOPMENT PROJECTS.—The procedures required by
18 subsection (a) shall ensure that the Secretary, in the formu-
19 lation of future water resources development projects—
20            (1) develops such projects in accordance with—
21                   (A) the guiding principles established by the
22            principles and requirements; and
23                   (B) the national water resources planning
24            policy established by section 2031(a) of the
25            Water Resources Development Act of 2007 (42
26            U.S.C. 1962–3(a)); and
      •S 1811 EAH
                                   23
 1            (2) fully identifies and analyzes national eco-
 2       nomic development benefits, regional economic devel-
 3       opment benefits, environmental quality benefits, and
 4       other societal effects.
 5       (c) REVIEW AND UPDATE.—Every 5 years, the Sec-
 6 retary shall review and, where appropriate, revise the pro-
 7 cedures required by subsection (a).
 8       (d) PUBLIC REVIEW, NOTICE, AND COMMENT.—In
 9 issuing, reviewing, and revising the procedures required by
10 this section, the Secretary shall—
11            (1) provide notice to interested non-Federal
12       stakeholders of the Secretary’s intent to revise the pro-
13       cedures;
14            (2) provide opportunities for interested non-Fed-
15       eral stakeholders to engage with, and provide input
16       and recommendations to, the Secretary on the revi-
17       sion of the procedures; and
18            (3) solicit and consider public and expert com-
19       ments.
20       (e) DEFINITIONS.—In this section:
21            (1)    INTERAGENCY         GUIDELINES.—The     term
22       ‘‘interagency    guidelines’’   means   the   interagency
23       guidelines contained in the document finalized by the
24       Council on Environmental Quality pursuant to sec-
25       tion 2031 of the Water Resources Development Act of


      •S 1811 EAH
                               24
 1       2007 (42 U.S.C. 1962–3) in December 2014, to imple-
 2       ment the principles and requirements.
 3             (2) PRINCIPLES AND REQUIREMENTS.—The term
 4       ‘‘principles and requirements’’ means the principles
 5       and requirements contained in the document prepared
 6       by the Council on Environmental Quality pursuant
 7       to section 2031 of the Water Resources Development
 8       Act of 2007 (42 U.S.C. 1962–3), entitled ‘‘Principles
 9       and Requirements for Federal Investments in Water
10       Resources’’, and dated March 2013.
11   SEC. 111. RESILIENCY PLANNING ASSISTANCE.

12       (a) IN GENERAL.—Section 206(a) of the Flood Control
13 Act of 1960 (33 U.S.C. 709a(a)) is amended by inserting
14 ‘‘, to avoid repetitive flooding impacts, to anticipate, pre-
15 pare, and adapt to changing climatic conditions and ex-
16 treme weather events, and to withstand, respond to, and re-
17 cover rapidly from disruption due to the flood hazards’’
18 after ‘‘in planning to ameliorate the flood hazard’’.
19       (b) PRIORITIZING FLOOD RISK RESILIENCY TECH-
20   NICAL   ASSISTANCE.—In carrying out section 206 of the
21 Flood Control Act of 1960 (33 U.S.C. 709a), the Secretary
22 shall prioritize the provision of technical assistance to sup-
23 port flood risk resiliency planning efforts of economically
24 disadvantaged communities or communities subject to re-
25 petitive flooding.


      •S 1811 EAH
                              25
 1   SEC. 112. PROJECT CONSULTATION.

 2       (a) REPORTS REQUIRED.—Not later than 180 days
 3 after the date of enactment of this Act, the Secretary shall
 4 submit the following reports:
 5            (1) The report required under section 1214 of the
 6       Water Resources Development Act of 2018 (132 Stat.
 7       3809).
 8            (2) The report required under section 1120(a)(3)
 9       of the Water Resources Development Act of 2016 (130
10       Stat. 1643).
11       (b) ENVIRONMENTAL JUSTICE UPDATES.—
12            (1) IN GENERAL.—In the formulation of water
13       development resources projects, the Secretary shall
14       comply with any existing Executive order regarding
15       environmental justice in effect as of the date of enact-
16       ment of this Act to address any disproportionate and
17       adverse human health or environmental effects on mi-
18       nority communities, low-income communities, and
19       Indian Tribes.
20            (2) UPDATE.—Not later than 1 year after the
21       date of enactment of this Act, the Secretary shall re-
22       view, and shall update, where appropriate, any poli-
23       cies, regulations, and guidance of the Corps of Engi-
24       neers necessary to implement any Executive order de-
25       scribed in paragraph (1) with respect to water re-
26       sources development projects.
      •S 1811 EAH
                               26
 1            (3) REQUIREMENTS.—In updating the policies,
 2       regulations, or guidance under paragraph (2), the
 3       Secretary shall—
 4                  (A) provide notice to interested non-Federal
 5            stakeholders, including representatives of minor-
 6            ity communities, low-income communities, and
 7            Indian Tribes;
 8                  (B) provide opportunities for interested
 9            stakeholders to comment on potential updates of
10            policies, regulations, or guidance;
11                  (C) consider the recommendations from the
12            reports submitted under subsection (a); and
13                  (D) promote the meaningful involvement of
14            minority communities, low-income communities,
15            and Indian Tribes.
16       (c) COMMUNITY ENGAGEMENT.—In carrying out a
17 water resources development project, the Secretary shall, to
18 the extent practicable—
19            (1) promote the meaningful involvement of mi-
20       nority communities, low-income communities, and
21       Indian Tribes;
22            (2) provide guidance and technical assistance to
23       such communities or Tribes to increase understanding
24       of the project development and implementation activi-




      •S 1811 EAH
                                 27
 1       ties, regulations, and policies of the Corps of Engi-
 2       neers; and
 3            (3) cooperate with State, Tribal, and local gov-
 4       ernments with respect to activities carried out pursu-
 5       ant to this subsection.
 6       (d) TRIBAL LANDS AND CONSULTATION.—In carrying
 7 out water resources development projects, the Secretary
 8 shall, to the extent practicable and in accordance with the
 9 Tribal Consultation Policy affirmed and formalized by the
10 Secretary on November 1, 2012 (or a successor policy)—
11            (1) promote meaningful involvement with Indian
12       Tribes specifically on any Tribal lands near or adja-
13       cent to any water resources development projects, for
14       purposes of identifying lands of ancestral, cultural, or
15       religious importance;
16            (2) consult with Indian Tribes specifically on
17       any Tribal areas near or adjacent to any water re-
18       sources development projects, for purposes of identi-
19       fying lands, waters, and other resources critical to the
20       livelihood of the Indian Tribes; and
21            (3) cooperate with Indian Tribes to avoid, or
22       otherwise find alternate solutions with respect to, such
23       areas.
24   SEC. 113. REVIEW OF RESILIENCY ASSESSMENTS.

25       (a) RESILIENCY ASSESSMENT.—


      •S 1811 EAH
                              28
 1           (1) IN GENERAL.—Not later than 180 days after
 2      the date of enactment of this section, and in conjunc-
 3      tion with the development of procedures under section
 4      110 of this Act, the Secretary is directed to review,
 5      and where appropriate, revise the existing planning
 6      guidance documents and regulations of the Corps of
 7      Engineers on the assessment of the effects of sea level
 8      rise or inland flooding on future water resources de-
 9      velopment projects to ensure that such guidance docu-
10      ments and regulations are based on the best available,
11      peer-reviewed science and data on the current and fu-
12      ture effects of sea level rise or inland flooding on rel-
13      evant communities.
14           (2) COORDINATION.—In carrying out this sub-
15      section, the Secretary shall—
16                 (A) coordinate the review with the Engineer
17           Research and Development Center, other Federal
18           and State agencies, and other relevant entities;
19           and
20                 (B) to the maximum extent practicable and
21           where appropriate, utilize data provided to the
22           Secretary by such agencies.
23      (b) ASSESSMENT OF BENEFITS FROM ADDRESSING
24 SEA LEVEL RISE AND INLAND FLOODING RESILIENCY IN
25 FEASIBILITY REPORTS.—


     •S 1811 EAH
                               29
 1            (1) IN GENERAL.—Upon the request of a non-
 2       Federal interest, in carrying out a feasibility study
 3       for a project for flood risk mitigation, hurricane and
 4       storm damage risk reduction, or ecosystem restoration
 5       under section 905 of the Water Resources Development
 6       Act of 1986 (33 U.S.C. 2282), the Secretary shall con-
 7       sider whether the need for the project is predicated
 8       upon or exacerbated by conditions related to sea level
 9       rise or inland flooding.
10            (2) ADDRESSING SEA LEVEL RISE AND INLAND
11       FLOODING RESILIENCY BENEFITS.—To the maximum

12       extent practicable, in carrying out a study pursuant
13       to paragraph (1), the Secretary shall document the
14       potential effects of sea level rise or inland flooding on
15       the project, and the expected benefits of the project re-
16       lating to sea level rise or inland flooding, during the
17       50-year period after the date of completion of the
18       project.
19   SEC. 114. SMALL FLOOD CONTROL PROJECTS.

20       Section 205 of the Flood Control Act of 1948 (33
21 U.S.C. 701s) is amended by inserting ‘‘, and projects that
22 use natural features or nature-based features (as those terms
23 are defined in section 1184(a) of the Water Resources Devel-
24 opment Act of 2016 (33 U.S.C. 2289a(a))),’’ after ‘‘non-
25 structural projects’’.


      •S 1811 EAH
                               30
 1   SEC. 115. FLOOD PROTECTION PROJECTS.

 2       (a) GENERAL CONSIDERATIONS.—Section 73(a) of the
 3 Water Resources Development Act of 1974 (33 U.S.C. 701b–
 4 11(a)) is amended by striking ‘‘including’’ and all that fol-
 5 lows through the period at the end and inserting the fol-
 6 lowing: ‘‘, with a view toward formulating the most eco-
 7 nomically, socially, and environmentally acceptable means
 8 of reducing or preventing flood damage, including—
 9            ‘‘(1)   floodproofing   of     structures,   including
10       through elevation;
11            ‘‘(2) floodplain regulation;
12            ‘‘(3) acquisition of floodplain land for rec-
13       reational, fish and wildlife, and other public pur-
14       poses;
15            ‘‘(4) relocation; and
16            ‘‘(5) the use of a feature described in section
17       1184(a) of the Water Infrastructure Improvements for
18       the Nation Act (33 U.S.C. 2289a(a)).’’.
19       (b) CONFORMING AMENDMENT.—Section 103(b) of the
20 Water Resources Development Act of 1986 (33 U.S.C. 2213)
21 is amended—
22            (1) in the subsection heading, by striking ‘‘NON-
23       STRUCTURAL     FLOOD CONTROL PROJECTS’’ and in-
24       serting ‘‘PROJECTS USING NONSTRUCTURAL, NAT-
25       URAL, OR NATURE-BASED FEATURES’’; and

26            (2) in paragraph (1)—
      •S 1811 EAH
                                31
 1                   (A) by striking ‘‘nonstructural flood control
 2            measures’’ and inserting ‘‘a flood risk manage-
 3            ment or hurricane and storm damage risk reduc-
 4            tion measure using a nonstructural feature, or a
 5            natural feature or nature-based feature (as those
 6            terms are defined in section 1184(a) of the Water
 7            Resources Development Act of 2016 (33 U.S.C.
 8            2289a(a))),’’; and
 9                   (B) by striking ‘‘cash during construction of
10            the project’’ and inserting ‘‘cash during construc-
11            tion for a nonstructural feature if the costs of
12            land, easements, rights-of-way, dredged material
13            disposal areas, and relocations for such feature
14            are estimated to exceed 35 percent’’.
15   SEC. 116. FEASIBILITY STUDIES; REVIEW OF NATURAL AND

16                  NATURE-BASED FEATURES.

17       (a) TECHNICAL CORRECTION.—Section 1149(c) of the
18 Water Resources Development Act of 2018 (33 U.S.C. 2282
19 note; 132 Stat. 3787) is amended by striking ‘‘natural in-
20 frastructure alternatives’’ and inserting ‘‘natural feature or
21 nature-based feature alternatives (as such terms are defined
22 in section 1184 of the Water Resources Development Act of
23 2016 (32 U.S.C. 2289a))’’.
24       (b) SUMMARY OF ANALYSIS.—To the maximum extent
25 practicable, the Secretary shall include in each feasibility


      •S 1811 EAH
                                32
 1 report developed under section 905 of the Water Resources
 2 Development Act of 1986 (33 U.S.C. 2282) for a project that
 3 contains a flood risk management or hurricane and storm
 4 damage risk reduction element, a summary of the natural
 5 feature or nature-based feature alternatives, along with
 6 their long-term costs and benefits, that were evaluated in
 7 the development of the feasibility report, and, if such alter-
 8 natives were not included in the recommended plan, an ex-
 9 planation of why such alternatives were not included in the
10 recommended plan.
11   SEC. 117. FEDERAL INTEREST DETERMINATION.

12       Section 905 of the Water Resources Development Act
13 of 1986 (33 U.S.C. 2282) is amended by inserting after sub-
14 section (a) the following:
15       ‘‘(b) FEDERAL INTEREST DETERMINATION.—
16            ‘‘(1) IN GENERAL.—
17                  ‘‘(A) ECONOMICALLY DISADVANTAGED COM-
18            MUNITIES.—In      preparing a feasibility report
19            under subsection (a) for a study that will benefit
20            an    economically     disadvantaged   community,
21            upon request by the non-Federal interest for the
22            study, the Secretary shall first determine the
23            Federal interest in carrying out the study and
24            the projects that may be proposed in the study.
25                  ‘‘(B) OTHER COMMUNITIES.—


      •S 1811 EAH
                              33
 1                      ‘‘(i) AUTHORIZATION.—In preparing a
 2                 feasibility report under subsection (a) for a
 3                 study that will benefit a covered commu-
 4                 nity, upon request by the non-Federal inter-
 5                 est for the study, the Secretary may, with
 6                 respect to not more than 3 studies in each
 7                 fiscal year, first determine the Federal in-
 8                 terest in carrying out the study and the
 9                 projects that may be proposed in the study.
10                      ‘‘(ii) COVERED COMMUNITIES.—In this
11                 subparagraph, the term ‘covered commu-
12                 nity’ means a community that—
13                           ‘‘(I) is not an economically dis-
14                      advantaged community; and
15                           ‘‘(II) the Secretary finds has a
16                      compelling need for the Secretary to
17                      make a determination under clause (i).
18           ‘‘(2) COST SHARE.—The costs of a determination
19      under paragraph (1)—
20                 ‘‘(A) shall be at Federal expense; and
21                 ‘‘(B) shall not exceed $200,000.
22           ‘‘(3) DEADLINE.—A determination under para-
23      graph (1) shall be completed by not later than 120
24      days after the date on which funds are made available
25      to the Secretary to carry out the determination.


     •S 1811 EAH
                              34
1            ‘‘(4) TREATMENT.—
2                  ‘‘(A) TIMING.—The period during which a
3            determination is being completed under para-
4            graph (1) for a study shall not be included for
5            purposes of the deadline to complete a final fea-
6            sibility report under section 1001(a)(1) of the
7            Water Resources Reform and Development Act of
8            2014 (33 U.S.C. 2282c(a)(1)).
 9                 ‘‘(B) COST.—The cost of a determination
10           under paragraph (1) shall not be included for
11           purposes of the maximum Federal cost under sec-
12           tion 1001(a)(2) of the Water Resources Reform
13           and Development Act of 2014 (33 U.S.C.
14           2282c(a)(2)).
15           ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If,
16      based on a determination under paragraph (1), the
17      Secretary determines that a study or project is not in
18      the Federal interest because the project will not result,
19      or is unlikely to result, in a recommended plan that
20      will produce national economic development benefits
21      greater than cost, but may result in a technically
22      sound and environmentally acceptable plan that is
23      otherwise consistent with section 904 of the Water Re-
24      sources Development Act of 1986 (33 U.S.C. 2281),
25      the Secretary shall issue a report to the non-Federal


     •S 1811 EAH
                               35
 1       interest with recommendations on how the non-Fed-
 2       eral interest might modify the proposal such that the
 3       project could be in the Federal interest and feasible.’’.
 4   SEC. 118. PILOT PROGRAMS ON THE FORMULATION OF

 5                  CORPS OF ENGINEERS PROJECTS IN RURAL

 6                  COMMUNITIES     AND   ECONOMICALLY       DIS-

 7                  ADVANTAGED COMMUNITIES.

 8       (a) IN GENERAL.—The Secretary shall establish and
 9 implement pilot programs, in accordance with this section,
10 to evaluate opportunities to address the flood risk manage-
11 ment and hurricane and storm damage risk reduction needs
12 of rural communities and economically disadvantaged com-
13 munities.
14       (b)   ECONOMICALLY       DISADVANTAGED      COMMUNITY
15 FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE
16 REDUCTION STUDY PILOT PROGRAM.—
17             (1) IN GENERAL.—Not later than 180 days after
18       the date of enactment of this Act, the Secretary shall
19       establish and implement a pilot program to carry out
20       feasibility studies, in accordance with this subsection,
21       for flood risk management and hurricane and storm
22       damage risk reduction projects for economically dis-
23       advantaged communities, in coordination with non-
24       Federal interests.




      •S 1811 EAH
                              36
 1           (2) PARTICIPATION IN PILOT PROGRAM.—In car-
 2      rying out paragraph (1), the Secretary shall—
 3                 (A) publish a notice in the Federal Register
 4           that requests from non-Federal interests pro-
 5           posals for the potential feasibility study of a
 6           flood risk management project or hurricane and
 7           storm damage risk reduction project for an eco-
 8           nomically disadvantaged community;
 9                 (B) upon request of a non-Federal interest
10           for such a project, provide technical assistance to
11           such non-Federal interest in the formulation of a
12           proposal for a potential feasibility study to be
13           submitted to the Secretary under the pilot pro-
14           gram; and
15                 (C) review such proposals and select 10 fea-
16           sibility studies for such projects to be carried out
17           by the Secretary, in coordination with the non-
18           Federal interest, under this pilot program.
19           (3) SELECTION CRITERIA.—In selecting a feasi-
20      bility study under paragraph (2)(C), the Secretary
21      shall consider whether—
22                 (A) the percentage of people living in pov-
23           erty in the county or counties (or county-equiva-
24           lent entity or entities) in which the project is lo-
25           cated is greater than the percentage of people liv-


     •S 1811 EAH
                              37
1            ing in poverty in the State, based on census bu-
2            reau data;
3                  (B) the percentage of families with income
4            above the poverty threshold but below the average
5            household income in the county or counties (or
6            county-equivalent entity or entities) in which the
7            project is located is greater than such percentage
8            for the State, based on census bureau data;
9                  (C) the percentage of the population that
10           identifies as belonging to a minority or indige-
11           nous group in the county or counties (or county-
12           equivalent entity or entities) in which the project
13           is located is greater than the average such per-
14           centage in the State, based on census bureau
15           data; and
16                 (D) the project is addressing flooding or
17           hurricane or storm damage effects that have a
18           disproportionate impact on a rural community,
19           a minority community, or an Indian Tribe.
20           (4) ADMINISTRATION.—Notwithstanding the re-
21      quirements of section 105(a)(1)(A) of the Water Re-
22      sources Development Act of 1986 (33 U.S.C. 2215),
23      the Federal share of the cost of a feasibility study car-
24      ried out under the pilot program shall be 100 percent.




     •S 1811 EAH
                              38
 1           (5) STUDY REQUIREMENTS.—Feasibility studies
 2      carried out under this subsection shall, to the max-
 3      imum extent practicable, incorporate natural features
 4      or nature-based features (as such terms are defined in
 5      section 1184 of the Water Resources Development Act
 6      of 2016 (33 U.S.C. 2289a)), or a combination of such
 7      features and nonstructural features, that avoid or re-
 8      duce at least 50 percent of flood or storm damages in
 9      one or more of the alternatives included in the final
10      alternatives evaluated.
11           (6) NOTIFICATION.—The Secretary shall notify
12      the Committee on Transportation and Infrastructure
13      of the House of Representatives and the Committee on
14      Environment and Public Works of the Senate of the
15      selection of each feasibility study under the pilot pro-
16      gram.
17           (7) COMPLETION.—Upon completion of a feasi-
18      bility report for a feasibility study selected to be car-
19      ried out under this subsection, the Secretary shall
20      transmit the report to Congress for authorization, and
21      shall include the report in the next annual report sub-
22      mitted under section 7001 of the Water Resources Re-
23      form and Development Act of 2014 (33 U.S.C.
24      2282d).




     •S 1811 EAH
                               39
 1       (c) PILOT PROGRAM FOR THE RECOMMENDATION OF
 2 FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE
 3 REDUCTION PROJECTS IN RURAL COMMUNITIES AND ECO-
 4   NOMICALLY DISADVANTAGED COMMUNITIES.—

 5            (1) IN GENERAL.—Not later than 180 days after
 6       the date of enactment of this Act, the Secretary shall
 7       establish and implement a pilot program to evaluate,
 8       and make recommendations to Congress on, flood risk
 9       management projects and hurricane and storm dam-
10       age risk reduction projects in rural communities or
11       economically disadvantaged communities, without
12       demonstrating that each project is justified solely by
13       national economic development benefits.
14            (2) CONSIDERATIONS.—In carrying out this sub-
15       section, the Secretary may make a recommendation to
16       Congress on up to 10 projects, without demonstrating
17       that the project is justified solely by national eco-
18       nomic development benefits, if the Secretary deter-
19       mines that—
20                  (A) the community to be served by the
21            project is an economically disadvantaged com-
22            munity or a rural community;
23                  (B) the long-term life safety, economic via-
24            bility, and environmental sustainability of the




      •S 1811 EAH
                               40
 1            community would be threatened without the
 2            project; and
 3                  (C) the project is consistent with the re-
 4            quirements of section 1 of the Flood Control Act
 5            of 1936 (33 U.S.C. 701a).
 6            (3) CONSISTENCY.—In carrying out this sub-
 7       section, the Secretary shall ensure that project rec-
 8       ommendations are consistent with the principles and
 9       requirements and the interagency guidelines, as such
10       terms are defined in section 110 of this Act, including
11       the consideration of quantifiable monetary and non-
12       monetary benefits of the project.
13            (4) PRIORITIZATION.—The Secretary may give
14       equivalent budgetary consideration and priority to
15       projects recommended under this subsection.
16       (d) GEOGRAPHIC DIVERSITY.—In selecting feasibility
17 studies under subsection (b)(2)(C) or in making project rec-
18 ommendations under subsection (c), the Secretary shall con-
19 sider the geographic diversity among proposed projects.
20       (e) REPORT.—Not later than 5 years and 10 years
21 after the date of enactment of this Act, the Secretary shall
22 submit to the Committee on Transportation and Infrastruc-
23 ture of the House of Representatives and the Committee on
24 Environment and Public Works of the Senate, and make




      •S 1811 EAH
                               41
 1 publicly available, a report detailing the results of the pilot
 2 programs carried out under this section, including—
 3            (1) a description of proposals received from non-
 4       Federal interests pursuant to subsection (b)(2)(A);
 5            (2) a description of technical assistance provided
 6       to non-Federal interests under subsection (b)(2)(B);
 7            (3) a description of proposals selected under sub-
 8       section (b)(2)(C) and criteria used to select such pro-
 9       posals;
10            (4) a description of the projects evaluated or rec-
11       ommended by the Secretary under subsection (c);
12            (5) a description of the quantifiable monetary
13       and nonmonetary benefits associated with the projects
14       recommended under subsection (c); and
15            (6) any recommendations to Congress on how the
16       Secretary can address the flood risk management and
17       hurricane and storm damage risk reduction needs of
18       economically disadvantaged communities.
19       (f) STATE DEFINED.—In this section, the term ‘‘State’’
20 means each of the several States, the District of Columbia,
21 and each of the commonwealths, territories, and possessions
22 of the United States.
23       (g) SUNSET.—The authority to commence a feasibility
24 study under subsection (b), and the authority make a rec-
25 ommendation under subsection (c), shall terminate on the


      •S 1811 EAH
                                42
 1 date that is 10 years after the date of enactment of this
 2 Act.
 3   SEC. 119. PERMANENT MEASURES TO REDUCE EMERGENCY

 4                  FLOOD FIGHTING NEEDS FOR COMMUNITIES

 5                  SUBJECT TO REPETITIVE FLOODING.

 6        (a) DEFINITIONS.—In this section:
 7            (1) AFFECTED COMMUNITY.—The term ‘‘affected
 8        community’’ means a legally constituted public body
 9        (as that term is used in section 221(b) of the Flood
10        Control Act of 1970 (42 U.S.C. 1962d–5b(b))—
11                   (A) with jurisdiction over an area that has
12            been subject to flooding in two or more events in
13            any 10-year period; and
14                   (B) that has received emergency flood-fight-
15            ing assistance, including construction of tem-
16            porary barriers by the Secretary, under section
17            5 of the Act of August 18, 1941 (33 U.S.C. 701n)
18            with respect to such flood events.
19            (2) NATURAL       FEATURE;   NATURE-BASED     FEA-

20        TURE.—The     terms ‘‘natural feature’’ and ‘‘nature-
21        based feature’’ have the meanings given those terms in
22        section 1184 of the Water Resources Development Act
23        of 2016 (33 U.S.C. 2289a).
24        (b) PROGRAM.—




      •S 1811 EAH
                              43
 1           (1) IN GENERAL.—The Secretary is authorized to
 2      carry out a program to study, design, and construct
 3      water resources development projects through meas-
 4      ures involving, among other things, strengthening,
 5      raising, extending, realigning, or otherwise modifying
 6      existing flood control works, designing new works,
 7      and incorporating natural features, nature-based fea-
 8      tures, or nonstructural features, as appropriate to
 9      provide flood and coastal storm risk management to
10      affected communities.
11           (2) CONSIDERATIONS.—In carrying out para-
12      graph (1), the Secretary shall, to the maximum extent
13      practical, review and, where appropriate, incorporate
14      natural features or nature-based features, or a com-
15      bination of such features and nonstructural features,
16      that avoid or reduce at least 50 percent of flood or
17      storm damages in one or more of the alternatives in-
18      cluded in the final alternatives evaluated.
19           (3) CONSTRUCTION.—
20                 (A) IN     GENERAL.—The     Secretary may
21           carry out a project described in paragraph (1)
22           without further congressional authorization if—
23                     (i) the Secretary determines that the
24                 project—




     •S 1811 EAH
                              44
 1                           (I) is advisable to reduce the risk
 2                     of flooding for an affected community;
 3                     and
 4                           (II) produces benefits that are in
 5                     excess of the estimated costs; and
 6                     (ii) the Federal share of the cost of the
 7                 construction does not exceed $17,500,000.
 8                 (B) SPECIFIC AUTHORIZATION.—If the Fed-
 9           eral share of the cost of a project described in
10           paragraph (1) exceeds $17,500,000, the Secretary
11           shall submit the project recommendation to Con-
12           gress for authorization prior to construction, and
13           shall include the project recommendation in the
14           next annual report submitted under section 7001
15           of the Water Resources Reform and Development
16           Act of 2014.
17                 (C) FINANCING.—
18                     (i) CONTRIBUTIONS.—If, based on a
19                 study carried out pursuant to paragraph
20                 (1), the Secretary determines that a project
21                 described in paragraph (1) will not produce
22                 benefits greater than cost, the Secretary
23                 shall allow the affected community to pay,
24                 or provide contributions equal to, an
25                 amount sufficient to make the remaining


     •S 1811 EAH
                               45
1                  costs of design and construction of the
2                  project equal to the estimated value of the
3                  benefits of the project.
 4                      (ii)    EFFECT        ON   NON-FEDERAL

 5                 SHARE.—Amounts provided by an affected

 6                 community under clause (i) shall be in ad-
 7                 dition to any payments or contributions the
 8                 affected community is required to provide
 9                 toward the remaining costs of design and
10                 construction of the project under section 103
11                 of the Water Resources Development Act of
12                 1986 (33 U.S.C. 2213).
13           (4) ABILITY TO PAY.—
14                 (A) IN GENERAL.—Any cost-sharing agree-
15           ment for a project entered into pursuant to this
16           section shall be subject to the ability of the af-
17           fected community to pay.
18                 (B) DETERMINATION.—The ability of any
19           affected community to pay shall be determined
20           by the Secretary in accordance with procedures
21           established by the Secretary.
22                 (C) EFFECT OF REDUCTION.—Any reduc-
23           tion in the non-Federal share of the cost of a
24           project described in paragraph (1) as a result of
25           a determination under this paragraph shall not


     •S 1811 EAH
                                   46
1             be included in the Federal share for purposes of
2             subparagraphs (A) and (B) of paragraph (3).
 3   SEC. 120. EMERGENCY RESPONSE TO NATURAL DISASTERS.

 4       Section 5 of the Act of August 18, 1941 (33 U.S.C.
 5 701n) is amended—
 6            (1) in subsection (a)—
 7                  (A) in paragraph (2)(B)—
 8                       (i) in clause (i)(I), by inserting ‘‘, or
 9                  provide    contributions    equal   to,’’   after
10                  ‘‘pay’’; and
11                       (ii) in clause (ii)—
12                             (I) in the heading, by inserting
13                       ‘‘AND CONTRIBUTIONS’’ after ‘‘OF PAY-
14                       MENTS’’;

15                             (II) by inserting ‘‘or contribu-
16                       tions’’ after ‘‘Non-Federal payments’’;
17                       and
18                             (III) by inserting ‘‘or contribu-
19                       tions’’ after ‘‘non-Federal payments’’;
20                       and
21                  (B) by adding at the end the following:
22            ‘‘(5) FEASIBILITY STUDY.—
23                  ‘‘(A) DETERMINATION.—Not later than 180
24            days after receiving, from a non-Federal sponsor
25            of a project to repair or rehabilitate a flood con-


      •S 1811 EAH
                              47
 1           trol work described in paragraph (1), a request
 2           to initiate a feasibility study to further modify
 3           the relevant flood control work to provide for an
 4           increased level of protection, the Secretary shall
 5           provide to the non-Federal sponsor a written de-
 6           cision on whether the Secretary has the authority
 7           under section 216 of the Flood Control Act of
 8           1970 (33 U.S.C. 549a) to undertake the requested
 9           feasibility study.
10                 ‘‘(B) RECOMMENDATION.—If the Secretary
11           determines under subparagraph (B) that the Sec-
12           retary does not have the authority to undertake
13           the requested feasibility study, the Secretary
14           shall include the request for a feasibility study in
15           the annual report submitted under section 7001
16           of the Water Resources Reform and Development
17           Act of 2014.’’; and
18           (2) in subsection (c)—
19                 (A) in the subsection heading, by striking
20           ‘‘LEVEE OWNERS MANUAL’’ and inserting ‘‘ELI-
21           GIBILITY’’;

22                 (B) in paragraph (1), in the heading, by
23           striking ‘‘IN GENERAL’’ and inserting ‘‘LEVEE
24           OWNER’S MANUAL’’;




     •S 1811 EAH
                              48
 1                 (C) by redesignating paragraphs (2) and
 2           (3) as paragraphs (3) and (4), respectively, and
 3           inserting after paragraph (1) the following:
 4           ‘‘(2) COMPLIANCE.—
 5                 ‘‘(A) IN   GENERAL.—Notwithstanding       the
 6           status of compliance of a non-Federal interest
 7           with the requirements of a levee owner’s manual
 8           described in paragraph (1), or with any other
 9           eligibility requirement established by the Sec-
10           retary related to the maintenance and upkeep re-
11           sponsibilities of the non-Federal interest, the Sec-
12           retary shall consider the non-Federal interest to
13           be eligible for repair and rehabilitation assist-
14           ance under this section if the non-Federal inter-
15           est—
16                     ‘‘(i) enters into a written agreement
17                 with the Secretary that identifies any items
18                 of deferred or inadequate maintenance and
19                 upkeep identified by the Secretary prior to
20                 the natural disaster; and
21                     ‘‘(ii) pays, during performance of the
22                 repair and rehabilitation work, all costs to
23                 address—




     •S 1811 EAH
                               49
 1                            ‘‘(I) any items of deferred or in-
 2                      adequate    maintenance    and     upkeep
 3                      identified by the Secretary; and
 4                            ‘‘(II) any repair or rehabilitation
 5                      work necessary to address damage the
 6                      Secretary attributes to such deferred or
 7                      inadequate maintenance or upkeep.
 8                  ‘‘(B) ELIGIBILITY.—The Secretary may
 9            only enter into one agreement under subpara-
10            graph (A) with any non-Federal interest.
11                  ‘‘(C) SUNSET.—The authority of the Sec-
12            retary to enter into agreements under paragraph
13            (2) shall terminate on the date that is 5 years
14            after the date of enactment of this paragraph.’’;
15            and
16                  (D) in paragraph (3) (as so redesignated),
17            by striking ‘‘this subsection’’ and inserting
18            ‘‘paragraph (1)’’.
19   SEC. 121. COST AND BENEFIT FEASIBILITY ASSESSMENT.

20       Section 1161(b) of the Water Resources Development
21 Act of 2018 (33 U.S.C. 701n note) is amended—
22            (1) in the matter preceding paragraph (1)—
23                  (A) by striking the ‘‘three fiscal years pre-
24            ceding’’ and inserting ‘‘five fiscal years pre-
25            ceding’’; and


      •S 1811 EAH
                                 50
 1                    (B) by striking ‘‘last day of the third fiscal
 2            year’’ and inserting ‘‘last day of the fifth fiscal
 3            year’’;
 4            (2) in paragraph (1), by inserting ‘‘, or provide
 5       contributions equal to,’’ before ‘‘an amount suffi-
 6       cient’’; and
 7            (3) by striking paragraph (2) and inserting the
 8       following:
 9            ‘‘(2) the Secretary determines that the damage to
10       the structure was not as a result of negligent oper-
11       ation or maintenance.’’.
12   SEC. 122. EXPEDITING REPAIRS AND RECOVERY FROM

13                  FLOODING.

14       (a) IN GENERAL.—To the maximum extent prac-
15 ticable, during the 5-year period beginning on the date of
16 enactment of this Act, the Secretary shall prioritize and ex-
17 pedite the processing of applications for permits under sec-
18 tion 10 of the Act of March 3, 1899 (33 U.S.C. 403), and
19 section 404 of the Federal Water Pollution Control Act (33
20 U.S.C. 1344), and permissions under section 14 of the Act
21 of March 3, 1899 (33 U.S.C. 408), to complete repairs, re-
22 construction (including improvements), and upgrades to
23 flood control infrastructure damaged by flooding events dur-
24 ing calendar years 2017 through 2020, including flooding
25 events caused by ice jams.


      •S 1811 EAH
                                 51
 1       (b) SAVINGS PROVISION.—Nothing in this section af-
 2 fects any obligation to comply with the requirements of any
 3 Federal law, including—
 4            (1) the National Environmental Policy Act of
 5       1969 (42 U.S.C. 4321 et seq.);
 6            (2) the Federal Water Pollution Control Act (33
 7       U.S.C. 1251 et seq.); and
 8            (3) the Endangered Species Act of 1973 (16
 9       U.S.C. 1531 et seq.).
10   SEC. 123. REVIEW OF CORPS OF ENGINEERS ASSETS.

11       Section 6002 of the Water Resources Reform and De-
12 velopment Act of 2014 (128 Stat. 1349) is amended to read
13 as follows:
14   ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS ASSETS.

15       ‘‘(a) ASSESSMENT.—The Secretary shall conduct an
16 assessment of projects constructed by the Secretary for
17 which the Secretary continues to have financial or oper-
18 ational responsibility.
19       ‘‘(b) INVENTORY.—Not later than 18 months after the
20 date of enactment of the Water Resources Development Act
21 of 2020, the Secretary shall, based on the assessment carried
22 out under subsection (a), develop an inventory of projects
23 or portions of projects—
24            ‘‘(1) that are not needed for the missions of the
25       Corps of Engineers;


      •S 1811 EAH
                                52
 1            ‘‘(2) the modification of which, including though
 2       the use of structural features, nonstructural features,
 3       or natural features or nature-based features (as those
 4       terms are defined in section 1184(a) of the Water Re-
 5       sources    Development      Act   of   2016   (33   U.S.C.
 6       2289a(a)), could improve the sustainable operations
 7       of the project, or reduce operation and maintenance
 8       costs for the project; or
 9            ‘‘(3) that are no longer having project purposes
10       adequately met by the Corps of Engineers, because of
11       deferment of maintenance or other challenges, and the
12       divestment of which to a non-Federal entity could bet-
13       ter meet the local and regional needs for operation
14       and maintenance.
15       ‘‘(c) CRITERIA.—In conducting the assessment under
16 subsection (a) and developing the inventory under sub-
17 section (b), the Secretary shall use the following criteria:
18            ‘‘(1) The extent to which the project aligns with
19       the current missions of the Corps of Engineers.
20            ‘‘(2) The economic and environmental impacts of
21       the project on existing communities in the vicinity of
22       the project.
23            ‘‘(3) The extent to which the divestment or modi-
24       fication of the project could reduce operation and
25       maintenance costs of the Corps of Engineers.


      •S 1811 EAH
                                 53
 1               ‘‘(4) The extent to which the divestment or modi-
 2       fication of the project is in the public interest.
 3               ‘‘(5) The extent to which investment of addi-
 4       tional Federal resources in the project proposed for
 5       divestment or modification, including investment
 6       needed to bring the project to a good state of repair,
 7       is in the public interest.
 8               ‘‘(6) The extent to which the authorized purpose
 9       of the project is no longer being met.
10       ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL INTER-
11   ESTS.—A      non-Federal interest for a project may rec-
12 ommend that the Secretary include such project in the as-
13 sessment or inventory required under this section.
14       ‘‘(e) REPORT TO CONGRESS.—
15               ‘‘(1) IN GENERAL.—Upon completion of the in-
16       ventory required by subsection (b), the Secretary shall
17       submit to the Committee on Environment and Public
18       Works of the Senate and the Committee on Transpor-
19       tation and Infrastructure of the House of Representa-
20       tives, and make publicly available, a report con-
21       taining the findings of the Secretary with respect to
22       the assessment and inventory required under this sec-
23       tion.
24               ‘‘(2) INCLUSION.—The Secretary shall list in an
25       appendix any recommendation of a non-Federal in-


      •S 1811 EAH
                                  54
 1          terest made with respect to a project under subsection
 2          (d) that the Secretary determines not to include in the
 3          inventory developed under subsection (b), based on the
 4          criteria in subsection (c), including information
 5          about the request and the reasons for the Secretary’s
 6          determination.’’.
 7   SEC.    124.   SENSE   OF   CONGRESS      ON    MULTIPURPOSE

 8                   PROJECTS.

 9          It is the sense of Congress that the Secretary, in coordi-
10 nation with non-Federal interests, should maximize the de-
11 velopment, evaluation, and recommendation of project al-
12 ternatives for future water resources development projects
13 that produce multiple project benefits, such as navigation,
14 flood risk management, and ecosystem restoration benefits,
15 including through the use of natural or nature-based fea-
16 tures and the beneficial use of dredged material.
17   SEC.    125.   BENEFICIAL    USE   OF   DREDGED      MATERIAL;

18                   DREDGED MATERIAL MANAGEMENT PLANS.

19          (a) NATIONAL POLICY ON THE BENEFICIAL USE OF
20 DREDGED MATERIAL.—
21               (1) IN GENERAL.—It is the policy of the United
22          States for the Corps of Engineers to maximize the
23          beneficial use, in an environmentally acceptable man-
24          ner, of suitable dredged material obtained from the




      •S 1811 EAH
                               55
 1      construction or operation and maintenance of water
 2      resources development projects.
 3           (2) PLACEMENT OF DREDGED MATERIALS.—
 4                 (A) IN GENERAL.—In evaluating the place-
 5           ment of dredged material obtained from the con-
 6           struction or operation and maintenance of water
 7           resources development projects, the Secretary
 8           shall consider—
 9                      (i) the suitability of the dredged mate-
10                 rial for a full range of beneficial uses; and
11                      (ii) the economic and environmental
12                 benefits, efficiencies, and impacts (including
13                 the effects on living coral) of using the
14                 dredged material for beneficial uses, includ-
15                 ing, in the case of beneficial use activities
16                 that involve more than one water resources
17                 development      project,    the   benefits,   effi-
18                 ciencies, and impacts that result from the
19                 combined activities.
20                 (B) CALCULATION         OF    FEDERAL      STAND-

21           ARD.—

22                      (i) DETERMINATION.—The economic
23                 benefits and efficiencies from the beneficial
24                 use of dredged material considered by the
25                 Secretary under subparagraph (A) shall be


     •S 1811 EAH
                              56
 1                 included in any determination relating to
 2                 the ‘‘Federal standard’’ by the Secretary
 3                 under section 335.7 of title 33, Code of Fed-
 4                 eral Regulations, for the placement or dis-
 5                 posal of such material.
 6                      (ii) REPORTS.—The Secretary shall
 7                 submit to Congress—
 8                           (I) a report detailing the method
 9                      and all of the factors utilized by the
10                      Corps of Engineers to determine the
11                      Federal standard referred to in clause
12                      (i); and
13                           (II) for each evaluation under
14                      subparagraph (A), a report displaying
15                      the calculations for economic and envi-
16                      ronmental   benefits    and      efficiencies
17                      from the beneficial use of dredged ma-
18                      terial (including, where appropriate,
19                      the utilization of alternative dredging
20                      equipment    and      dredging     disposal
21                      methods) considered by the Secretary
22                      under such subparagraph for the place-
23                      ment or disposal of such material.
24                 (C) SELECTION     OF      DREDGED     MATERIAL

25           DISPOSAL METHOD FOR CERTAIN PURPOSES.—



     •S 1811 EAH
                            57
 1           Section 204(d) of the Water Resources Develop-
 2           ment Act of 1992 (33 U.S.C. 2326(d)) is amend-
 3           ed—
 4                    (i) in paragraph (1)—
 5                         (I) in the matter preceding sub-
 6                    paragraph (A), by striking ‘‘In devel-
 7                    oping’’ and all that follows through
 8                    ‘‘the non-Federal interest,’’ and insert-
 9                    ing ‘‘At the request of the non-Federal
10                    interest for a water resources develop-
11                    ment project involving the disposal of
12                    dredged material, the Secretary, using
13                    funds appropriated for construction or
14                    operation and maintenance of the
15                    project, may select’’; and
16                         (II) in subparagraph (B), by
17                    striking ‘‘flood and storm damage and
18                    flood reduction benefits’’ and inserting
19                    ‘‘hurricane and storm or flood risk re-
20                    duction benefits’’; and
21                    (ii) by adding at the end the following:
22           ‘‘(5) SELECTION OF DREDGED MATERIAL DIS-
23      POSAL METHOD FOR CERTAIN PURPOSES.—Activities

24      carried out under this subsection—




     •S 1811 EAH
                               58
 1                 ‘‘(A) shall be carried out using amounts ap-
 2            propriated for construction or operation and
 3            maintenance of the project involving the disposal
 4            of the dredged material; and
 5                 ‘‘(B) shall not carried out using amounts
 6            made available under subsection (g).’’.
 7      (b) BENEFICIAL USE OF DREDGED MATERIAL.—
 8            (1) PILOT PROGRAM PROJECTS.—Section 1122 of
 9      the Water Resources Development Act of 2016 (33
10      U.S.C. 2326 note) is amended—
11                 (A) in subsection (a)—
12                       (i) in paragraph (6), by striking ‘‘;
13                 and’’ and inserting a semicolon;
14                       (ii) in paragraph (7)(C), by striking
15                 the period at the end and inserting ‘‘; and’’;
16                 and
17                       (iii) by adding at the end the fol-
18                 lowing:
19            ‘‘(8) recovering lost storage capacity in reservoirs
20      due to sediment accumulation, if the project also has
21      a purpose described in any of paragraphs (1) through
22      (7).’’;
23                 (B) in subsection (b)(1), by striking ‘‘20’’
24            and inserting ‘‘35’’; and




     •S 1811 EAH
                                 59
 1                 (C) in subsection (g), by striking ‘‘20’’ and
 2           inserting ‘‘35’’.
 3           (2) SENSE OF CONGRESS.—It is the sense of
 4      Congress that the Secretary, in selecting projects for
 5      the beneficial use of dredged materials under section
 6      1122 of the Water Resources Development Act of 2016
 7      (33 U.S.C. 2326 note), should ensure the thorough
 8      evaluation of project submissions from rural, small,
 9      and economically disadvantaged communities.
10           (3) PROJECT SELECTION.—In selecting projects
11      for the beneficial use of dredged materials under sec-
12      tion 1122 of the Water Resources Development Act of
13      2016 (33 U.S.C. 2326 note), the Secretary shall
14      prioritize the selection of at least one project for the
15      utilization of thin layer placement of dredged fine
16      and coarse grain sediment and at least one project for
17      recovering lost storage capacity in reservoirs due to
18      sediment accumulation authorized by subsection
19      (a)(8) of such section, to the extent that a non-Federal
20      interest has submitted an application for such project
21      purposes that otherwise meets the requirements of
22      such section.
23           (4) TEMPORARY EASEMENTS.—Section 1148 of
24      the Water Resources Development Act of 2018 (33
25      U.S.C. 2326 note) is amended—


     •S 1811 EAH
                               60
 1                  (A) in subsection (a)—
 2                       (i) by striking ‘‘grant’’ and inserting
 3                  ‘‘approve’’; and
 4                       (ii) by striking ‘‘granting’’ and insert-
 5                  ing ‘‘approving’’; and
 6                  (B) in subsection (b), by striking ‘‘grants’’
 7            and inserting ‘‘approves’’.
8        (c) FIVE-YEAR REGIONAL DREDGED MATERIAL MAN-
 9   AGEMENT PLANS.—

10            (1) IN GENERAL.—Not later than 1 year after
11       the date of enactment of this Act, and annually there-
12       after, the District Commander of each district of the
13       Corps of Engineers that obtains dredged material
14       through the construction or operation and mainte-
15       nance of a water resources development project shall,
16       at Federal expense, develop and submit to the Sec-
17       retary a 5-year dredged material management plan
18       in coordination with relevant State agencies and
19       stakeholders.
20            (2) SCOPE.—Each plan developed under this
21       subsection shall include—
22                  (A) a dredged material budget for each wa-
23            tershed or littoral system within the district;
24                  (B) an estimate of the amount of dredged
25            material likely to be obtained through the con-


      •S 1811 EAH
                              61
1            struction or operation and maintenance of all
2            water resources development projects projected to
3            be carried out within the district during the 5-
4            year period following submission of the plan,
5            and the estimated timing for obtaining such
6            dredged material;
7                  (C) an identification of potential water re-
8            sources development projects projected to be car-
9            ried out within the district during such 5-year
10           period that are suitable for, or that require, the
11           placement of dredged material, and an estimate
12           of the amount of dredged material placement ca-
13           pacity of such projects;
14                 (D) an evaluation of—
15                      (i) the suitability of the dredged mate-
16                 rial for a full range of beneficial uses; and
17                      (ii) the economic and environmental
18                 benefits, efficiencies, and impacts (including
19                 the effects on living coral) of using the
20                 dredged material for beneficial uses, includ-
21                 ing, in the case of beneficial use activities
22                 that involve more than one water resources
23                 development     project,   the   benefits,   effi-
24                 ciencies, and impacts that result from the
25                 combined activities;


     •S 1811 EAH
                              62
 1                 (E) the district-wide goals for beneficial use
 2           of the dredged material, including any expected
 3           cost savings from aligning and coordinating
 4           multiple projects (including projects across Corps
 5           districts) in the use of the dredged material; and
 6                 (F) a description of potential beneficial use
 7           projects identified through stakeholder solicita-
 8           tion and coordination.
 9           (3) PUBLIC COMMENT.—In developing each plan
10      under this subsection, each District Commander shall
11      provide notice and an opportunity for public com-
12      ment, including a solicitation for stakeholders to iden-
13      tify beneficial use projects, in order to ensure, to the
14      extent practicable, that beneficial use of dredged mate-
15      rial is not foregone in a particular fiscal year or
16      dredging cycle.
17           (4) PUBLIC AVAILABILITY.—Upon submission of
18      each plan to the Secretary under this subsection, each
19      District Commander shall make the plan publicly
20      available, including on a publicly available website.
21           (5) TRANSMISSION TO CONGRESS.—As soon as
22      practicable after receiving a plan under subsection
23      (a), the Secretary shall transmit the plan to Congress.
24           (6) REGIONAL SEDIMENT MANAGEMENT PLANS.—
25      A plan developed under this section—


     •S 1811 EAH
                              63
 1                 (A) shall be in addition to regional sedi-
 2            ment management plans prepared under section
 3            204(a) of the Water Resources Development Act
 4            of 1992 (33 U.S.C. 2326(a)); and
 5                 (B) shall not be subject to the limitations in
 6            section 204(g) of the Water Resources Develop-
 7            ment Act of 1992 (33 U.S.C. 2326(g)).
 8      (d) DREDGE PILOT PROGRAM.—
 9            (1) REVISIONS.—Section 1111 of the Water Re-
10      sources Development Act of 2018 (33 U.S.C. 2326
11      note) is amended—
12                 (A) in subsection (a), by striking ‘‘for the
13            operation and maintenance of harbors and in-
14            land harbors’’ and all that follows through the
15            period at the end and inserting the following:
16            ‘‘for the operation and maintenance of—
17            ‘‘(1) harbors and inland harbors referred to in
18      section 210(a)(2) of the Water Resources Development
19      Act of 1986 (33 U.S.C. 2238(a)(2)); or
20            ‘‘(2) inland and intracoastal waterways of the
21      United States described in section 206 of the Inland
22      Waterways Revenue Act of 1978 (33 U.S.C. 1804).’’;
23      and




     •S 1811 EAH
                                 64
 1                    (B) in subsection (b), by striking ‘‘or inland
 2            harbors’’ and inserting ‘‘, inland harbors, or in-
 3            land or intracoastal waterways’’.
 4            (2) COORDINATION         WITH EXISTING AUTHORI-

 5       TIES.—The Secretary may carry out the dredge pilot

 6       program authorized by section 1111 of the Water Re-
 7       sources Development Act of 2018 (33 U.S.C. 2326
 8       note) in coordination with Federal regional dredge
 9       demonstration programs in effect on the date of enact-
10       ment of this Act.
11   SEC. 126. AQUATIC ECOSYSTEM RESTORATION FOR ANAD-

12                  ROMOUS FISH.

13       (a) ANADROMOUS FISH HABITAT AND PASSAGE.—Sec-
14 tion 206 of the Water Resources Development Act of 1996
15 (33 U.S.C. 2330) is amended—
16            (1) in subsection (a), by adding at the end the
17       following:
18            ‘‘(3) ANADROMOUS         FISH     HABITAT   AND   PAS-

19       SAGE.—

20                    ‘‘(A) MEASURES.—A project under this sec-
21            tion may include measures to improve habitat or
22            passage for anadromous fish, including—
23                         ‘‘(i) installing fish bypass structures on
24                    small water diversions;
25                         ‘‘(ii) modifying tide gates; and


      •S 1811 EAH
                                         65
 1                             ‘‘(iii)    restoring   or   reconnecting
 2                     floodplains and wetlands that are impor-
 3                     tant for anadromous fish habitat or pas-
 4                     sage.
 5                     ‘‘(B) BENEFITS.—A project that includes
 6             measures under this paragraph shall be formu-
 7             lated to maximize benefits for the anadromous
 8             fish species benefitted by the project.’’; and
 9             (2) by adding at the end the following:
10       ‘‘(g) PRIORITIZATION.—The Secretary shall give
11 projects that include measures described in subsection (a)(3)
12 equal priority for implementation as other projects under
13 this section.’’.
14   SEC. 127. ANNUAL REPORT TO CONGRESS ON WATER RE-

15                    SOURCES INFRASTRUCTURE.

16       (a) IN GENERAL.—Section 7001 of the Water Re-
17 sources Reform and Development Act of 2014 (33 U.S.C.
18 2282d) is amended—
19             (1) in subsection (c)—
20                     (A) in paragraph (1)—
21                             (i) in subparagraph (B)(ii)(III), by
22                     inserting ‘‘, regional, or local’’ after ‘‘na-
23                     tional’’; and
24                             (ii) by adding at the end the following:




      •S 1811 EAH
                               66
 1                 ‘‘(D) MODIFICATIONS      OF PROJECTS CAR-

 2           RIED OUT PURSUANT TO CONTINUING AUTHORITY

 3           PROGRAMS.—

 4                      ‘‘(i) IN GENERAL.—With respect to a
 5                 project being carried out pursuant to a con-
 6                 tinuing authority program for which a pro-
 7                 posed modification is necessary because the
 8                 project is projected to exceed, in the coming
 9                 fiscal year, the maximum Federal cost of
10                 the project, the Secretary shall include a
11                 proposed modification in the annual report
12                 if the proposed modification will result in
13                 completion of construction the project and
14                 the justification for the modification is not
15                 the result of a change in the scope of the
16                 project.
17                      ‘‘(ii) INCLUSION.—For each proposed
18                 modification included in an annual report
19                 under clause (i), the Secretary shall include
20                 in the annual report—
21                            ‘‘(I) a justification of why the
22                      modification is necessary;
23                            ‘‘(II) an estimate of the total cost
24                      and timeline required to complete con-
25                      struction of the project; and


     •S 1811 EAH
                               67
1                           ‘‘(III) an indication of continued
2                      support by the non-Federal interest
3                      and the financial ability of the non-
4                      Federal interest to provide the required
5                      cost-share.
 6                     ‘‘(iii) DEFINITION.—For the purposes
 7                 of this subparagraph, the term ‘continuing
 8                 authority program’ means any of—
 9                          ‘‘(I) section 14 of the Flood Con-
10                     trol Act of 1946 (33 U.S.C. 701r);
11                          ‘‘(II) section 3 of the Act of Au-
12                     gust 13, 1946 (33 U.S.C. 426g);
13                          ‘‘(III) section 107 of the River
14                     and Harbor Act of 1960 (33 U.S.C.
15                     577);
16                          ‘‘(IV) section 111 of the River and
17                     Harbor Act of 1968 (33 U.S.C. 426i);
18                          ‘‘(V) section 204 of the Water Re-
19                     sources Development Act of 1992 (33
20                     U.S.C. 2326);
21                          ‘‘(VI) section 205 of the Flood
22                     Control Act of 1948 (33 U.S.C. 701s);
23                          ‘‘(VII) section 206 of the Water
24                     Resources Development Act of 1996 (33
25                     U.S.C. 2330);


     •S 1811 EAH
                                 68
 1                              ‘‘(VIII) section 2 of the Act of Au-
 2                      gust 28, 1937 (33 U.S.C. 701g); and
 3                              ‘‘(IX) section 1135 of the Water
 4                      Resources Development Act of 1986 (33
 5                      U.S.C. 2309a).’’; and
 6                 (B) in paragraph (4)(B)—
 7                      (i) in clause (i), by striking ‘‘and’’ at
 8                 the end;
 9                      (ii) by redesignating clause (ii) as
10                 clause (iii); and
11                      (iii) by inserting after clause (i) the
12                 following:
13                      ‘‘(ii) the Secretary shall not include
14                 proposals in the appendix of the annual re-
15                 port that otherwise meet the criteria for in-
16                 clusion in the annual report solely on the
17                 basis that the proposals are for the purposes
18                 of navigation, flood risk management, eco-
19                 system restoration, or municipal or agricul-
20                 tural water supply; and’’; and
21           (2) in subsection (g)(5), by striking ‘‘if author-
22      ized’’ and all that follows through ‘‘2016’’.
23      (b) OVER-BUDGET CAP PROGRAMS.—For any project
24 carried out under a continuing authority program, as such
25 term is defined in section 7001(c)(1)(D) of the Water Re-


     •S 1811 EAH
                                69
 1 sources Reform and Development Act of 2014 (33 U.S.C.
 2 2282d)), for which the Secretary is required to include a
 3 proposed modification in an annual report under such sec-
 4 tion 7001(c)(1)(D), the Secretary shall, to the extent prac-
 5 ticable, inform the non-Federal interest of the process for
 6 carrying out the project pursuant to section 105 of the
 7 Water Resources Development Act of 1986 (33 U.S.C. 2215)
 8 and whether the Secretary has the authority to complete a
 9 feasibility study for the project.
10         (c) ANNUAL REPORT ON STATUS OF FEASIBILITY
11 STUDIES.—Concurrent with each report submitted under
12 section 7001 of the Water Resources Reform and Develop-
13 ment Act of 2014 (33 U.S.C. 2282d), the Secretary shall
14 submit to the Committee on Transportation and Infrastruc-
15 ture of the House of Representatives and the Committee on
16 Environment and Public Works of the Senate a report that
17 provides for an accounting of all outstanding feasibility
18 studies being conducted by the Secretary, including, for
19 each such study, its length, cost, and expected completion
20 date.
21   SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRATION PRO-

22                  GRAM.

23         (a) IN GENERAL.—The Secretary shall carry out a
24 demonstration program to determine the causes of, and im-
25 plement measures to effectively detect, prevent, treat, and


      •S 1811 EAH
                              70
 1 eliminate, harmful algal blooms associated with water re-
 2 sources development projects.
 3       (b) CONSULTATION; USE OF EXISTING DATA AND PRO-
 4   GRAM AUTHORITIES.—In carrying out the demonstration

 5 program under subsection (a), the Secretary shall—
 6            (1) consult with the heads of appropriate Federal
 7       and State agencies; and
 8            (2) make maximum use of existing Federal and
 9       State data and ongoing programs and activities of
10       Federal and State agencies, including the activities of
11       the Secretary carried out through the Engineer Re-
12       search and Development Center pursuant to section
13       1109 of the Water Resources Development Act of 2018
14       (33 U.S.C. 610 note).
15       (c) FOCUS AREAS.—In carrying out the demonstration
16 program under subsection (a), the Secretary shall undertake
17 program activities related to harmful algal blooms in the
18 Great Lakes, the tidal and inland waters of the State of
19 New Jersey, the coastal and tidal waters of the State of Lou-
20 isiana, the waterways of the counties that comprise the Sac-
21 ramento-San Joaquin Delta, California, the Allegheny Res-
22 ervoir Watershed, New York, and Lake Okeechobee, Florida.
23       (d) ADDITIONAL FOCUS AREAS.—In addition to the
24 areas described in subsection (c), in carrying out the dem-
25 onstration program under subsection (a), the Secretary


      •S 1811 EAH
                              71
 1 shall undertake program activities related to harmful algal
 2 blooms at any Federal reservoir located in the Upper Mis-
 3 souri River Basin or the North Platte River Basin, at the
 4 request and expense of another Federal agency.
 5       (e) AUTHORIZATION OF APPROPRIATIONS.—There is
 6 authorized to be appropriated to the Secretary $25,000,000
 7 to carry out this section. Such sums shall remain available
 8 until expended.
 9   SEC. 129. MISSOURI RIVER INTERCEPTION-REARING COM-

10                  PLEX CONSTRUCTION.

11       (a) REPORT.—Not later than 1 year after the date of
12 enactment of this Act, and annually thereafter, the Sec-
13 retary shall submit to the Committee on Transportation
14 and Infrastructure of the House of Representatives and the
15 Committee on Environment and Public Works of the Senate
16 a report on the effects of any interception-rearing complex
17 constructed on the Missouri River on—
18            (1) flood risk management and navigation; and
19            (2) the population recovery of the pallid stur-
20       geon, including baseline population counts.
21       (b) NO ADDITIONAL IRC CONSTRUCTION.—The Sec-
22 retary may not authorize construction of an interception-
23 rearing complex on the Missouri River until the Sec-
24 retary—
25            (1) submits the report required by subsection (a);


      •S 1811 EAH
                                72
 1            (2) acting through the Engineer Research and
 2       Development Center, conducts further research on
 3       interception-rearing complex design, including any
 4       effects on existing flows, flood risk management, and
 5       navigation; and
 6            (3) develops a plan—
 7                   (A) to repair dikes and revetments that are
 8            affecting flood risk and bank erosion; and
 9                   (B) to establish, repair, or improve water
10            control structures at the headworks of constructed
11            shallow water habitat side-channels.
12       (c) FUTURE IRC CONSTRUCTION.—
13            (1) PUBLIC COMMENT.—The Secretary shall pro-
14       vide an opportunity for comment from the public and
15       the Governor of each affected State on any proposals
16       to construct an interception-rearing complex after the
17       date of enactment of this Act.
18            (2) PERIOD.—The public comment period re-
19       quired by paragraph (1) shall be not less than 90
20       days for each proposal to construct an interception-
21       rearing complex on the Missouri River.
22   SEC. 130. MATERIALS, SERVICES, AND FUNDS FOR REPAIR,

23                  RESTORATION,     OR   REHABILITATION     OF

24                  PROJECTS.

25       (a) DEFINITIONS.—In this section:


      •S 1811 EAH
                               73
 1            (1) COVERED AREA.—The term ‘‘covered area’’
 2       means an area—
 3                  (A) for which the Governor of a State has
 4            requested a determination that an emergency ex-
 5            ists; or
 6                  (B) covered by an emergency or major dis-
 7            aster declaration declared under the Robert T.
 8            Stafford Disaster Relief and Emergency Assist-
 9            ance Act (42 U.S.C. 5121 et seq.).
10            (2) EMERGENCY PERIOD.—The term ‘‘emergency
11       period’’ means—
12                  (A) with respect to a covered area described
13            in paragraph (1)(A), the period during which
14            the Secretary determines an emergency exists;
15            and
16                  (B) with respect to a covered area described
17            in paragraph (1)(B), the period during which
18            the applicable declaration is in effect.
19       (b) IN GENERAL.—In any covered area, the Secretary
20 is authorized to accept and use materials, services, and
21 funds, during the emergency period, from a non-Federal in-
22 terest or private entity to repair, restore, or rehabilitate a
23 federally authorized water resources development project,
24 and to provide reimbursement to such non-Federal interest
25 or private entity for such materials, services, and funds,


      •S 1811 EAH
                               74
 1 in the Secretary’s sole discretion, and subject to the avail-
 2 ability of appropriations, if the Secretary determines that
 3 reimbursement is in the public interest.
 4       (c) ADDITIONAL REQUIREMENT.—The Secretary may
 5 only reimburse for the use of materials or services accepted
 6 under this section if such materials or services meet the Sec-
 7 retary’s specifications and comply with all applicable laws
 8 and regulations that would apply if such materials and
 9 services were acquired by the Secretary, including sections
10 3141 through 3148 and 3701 through 3708 of title 40,
11 United States Code, section 8302 of title 41, United States
12 Code, and the National Environmental Policy Act of 1969.
13       (d) AGREEMENTS.—
14            (1) IN GENERAL.—Prior to the acceptance of ma-
15       terials, services, or funds under this section, the Sec-
16       retary and the non-Federal interest or private entity
17       shall enter into an agreement that specifies—
18                  (A) the non-Federal interest or private enti-
19            ty shall hold and save the United States free
20            from any and all damages that arise from use of
21            materials or services of the non-Federal interest
22            or private entity, except for damages due to the
23            fault or negligence of the United States or its
24            contractors;




      •S 1811 EAH
                                75
 1                   (B) the non-Federal interest or private enti-
 2             ty shall certify that the materials or services
 3             comply with all applicable laws and regulations
 4             under subsection (c); and
 5                   (C) any other term or condition required by
 6             the Secretary.
 7             (2) EXCEPTION.—If an agreement under para-
 8        graph (1) was not entered prior to materials or serv-
 9        ices being contributed, a non-Federal interest or pri-
10        vate entity shall enter into an agreement with the
11        Secretary that—
12                   (A) specifies the value, as determined by the
13             Secretary, of those materials or services contrib-
14             uted and eligible for reimbursement; and
15                   (B) ensures that the materials or services
16             comply with subsection (c) and paragraph (1).
17   SEC. 131. LEVEE SAFETY.

18        Section 9004 of the Water Resources Development Act
19 of 2007 (33 U.S.C. 3303) is amended by adding at the end
20 the following:
21        ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—
22             ‘‘(1) IN GENERAL.—For each levee included in
23        an inventory established under subsection (b) or for
24        which the Secretary has conducted a review under
25        subsection (c), the Secretary shall—


       •S 1811 EAH
                               76
 1                  ‘‘(A) identify the specific engineering and
 2            maintenance deficiencies, if any; and
 3                  ‘‘(B) describe the recommended remedies to
 4            correct each deficiency identified under subpara-
 5            graph (A), and, if requested by owner of a non-
 6            Federal levee, the associated costs of those rem-
 7            edies.
 8            ‘‘(2) CONSULTATION.—In identifying deficiencies
 9       and describing remedies for a levee under paragraph
10       (1), the Secretary shall consult with relevant non-Fed-
11       eral interests, including by providing an opportunity
12       for comment by those non-Federal interests.’’.
13   SEC. 132. NATIONAL DAM SAFETY PROGRAM.

14       (a) DEFINITIONS.—Section 2 of the National Dam
15 Safety Program Act (33 U.S.C. 467) is amended—
16            (1) in paragraph (4)—
17                  (A) in subparagraph (A)—
18                       (i) by striking clause (iii) and insert-
19                  ing the following:
20                       ‘‘(iii) has an emergency action plan
21                  that—
22                            ‘‘(I) is approved by the relevant
23                       State dam safety agency; or
24                            ‘‘(II) is in conformance with
25                       State law and pending approval by the


      •S 1811 EAH
                                  77
 1                       relevant State dam safety agency;’’;
 2                       and
 3                       (ii) by striking clause (iv) and insert-
 4                 ing the following:
 5                       ‘‘(iv) fails to meet minimum dam safe-
 6                 ty standards of the State in which the dam
 7                 is located, as determined by the State; and
 8                       ‘‘(v) poses an unacceptable risk to the
 9                 public, as determined by the Administrator,
10                 in consultation with the Board.’’; and
11                 (B) in subparagraph (B)(i), by inserting
12           ‘‘under a hydropower project with an authorized
13           installed        capacity   of    greater   than   1.5
14           megawatts’’ after ‘‘dam’’; and
15           (2) in paragraph (10)—
16                 (A) in the heading, by striking ‘‘NON-FED-
17           ERAL SPONSOR’’ and inserting ‘‘ELIGIBLE SUB-

18           RECIPIENT’’; and

19                 (B) by striking ‘‘The term ‘non-Federal
20           sponsor’ ’’ and inserting ‘‘The term ‘eligible sub-
21           recipient’ ’’.
22      (b) REHABILITATION OF HIGH HAZARD POTENTIAL
23 DAMS.—
24           (1)   ESTABLISHMENT          OF    PROGRAM.—Section

25      8A(a) of the National Dam Safety Program Act (33


     •S 1811 EAH
                              78
 1      U.S.C. 467f–2(a)) is amended by striking ‘‘to non-
 2      Federal sponsors’’ and inserting ‘‘to States with dam
 3      safety programs’’.
 4           (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of the
 5      National Dam Safety Program Act (33 U.S.C. 467f–
 6      2(b)) is amended, in the matter preceding paragraph
 7      (1), by striking ‘‘for a project may be used for’’ and
 8      inserting ‘‘to a State may be used by the State to
 9      award grants to eligible subrecipients for’’.
10           (3) AWARD OF GRANTS.—Section 8A(c) of the
11      National Dam Safety Program Act (33 U.S.C. 467f–
12      2(c)) is amended—
13                 (A) in paragraph (1)(A), by striking ‘‘non-
14           Federal sponsor’’ and inserting ‘‘State’’; and
15                 (B) in paragraph (2)—
16                     (i) in subparagraph (A), by striking
17                 ‘‘an eligible high hazard potential dam to a
18                 non-Federal sponsor’’ and inserting ‘‘eligi-
19                 ble high hazard potential dams to a State’’;
20                     (ii) in subparagraph (B)—
21                           (I) in the subparagraph heading,
22                     by striking ‘‘PROJECT GRANT’’ and in-
23                     serting ‘‘GRANT’’;
24                           (II) by striking ‘‘project grant
25                     agreement with the non-Federal spon-


     •S 1811 EAH
                              79
 1                      sor’’ and inserting ‘‘grant agreement
 2                      with the State’’; and
 3                           (III) by striking ‘‘project,’’ and
 4                      inserting ‘‘projects for which the grant
 5                      is awarded,’’;
 6                      (iii) by amending subparagraph (C) to
 7                 read as follows:
8                  ‘‘(C) GRANT     ASSURANCE.—As     part of a
9            grant agreement under subparagraph (B), the
10           Administrator shall require that each eligible
11           subrecipient to which the State awards a grant
12           under this section provides an assurance, with
13           respect to the dam to be rehabilitated by the eli-
14           gible subrecipient, that the dam owner will carry
15           out a plan for maintenance of the dam during
16           the expected life of the dam.’’; and
17                      (iv) in subparagraph (D), by striking
18                 ‘‘A grant provided under this section shall
19                 not exceed’’ and inserting ‘‘A State may not
20                 award a grant to an eligible subrecipient
21                 under this section that exceeds, for any 1
22                 dam,’’.
23           (4) REQUIREMENTS.—Section 8A(d) of the Na-
24      tional Dam Safety Program Act (33 U.S.C. 467f–
25      2(d)) is amended—


     •S 1811 EAH
                                  80
1                  (A) in paragraph (1), by inserting ‘‘to an
2            eligible subrecipient’’ after ‘‘this section’’;
3                  (B) in paragraph (2)—
4                       (i) in the paragraph heading, by strik-
 5                 ing ‘‘NON-FEDERAL SPONSOR’’ and insert-
 6                 ing ‘‘ELIGIBLE SUBRECIPIENT’’;
 7                      (ii) in the matter preceding subpara-
 8                 graph (A), by striking ‘‘the non-Federal
 9                 sponsor shall’’ and inserting ‘‘an eligible
10                 subrecipient shall, with respect to the dam
11                 to be rehabilitated by the eligible sub-
12                 recipient’’;
13                      (iii) by amending subparagraph (A) to
14                 read as follows:
15                 ‘‘(A) demonstrate that the community in
16           which the dam is located participates in, and
17           complies with, all applicable Federal flood insur-
18           ance programs, including demonstrating that
19           such community is participating in the National
20           Flood Insurance Program, and is not on proba-
21           tion, suspended, or withdrawn from such Pro-
22           gram;’’;
23                      (iv) in subparagraph (B), by striking
24                 ‘‘have’’ and inserting ‘‘beginning not later
25                 than 2 years after the date on which the Ad-


     •S 1811 EAH
                               81
1                  ministrator publishes criteria for hazard
2                  mitigation plans under paragraph (3),
3                  demonstrate that the Tribal or local govern-
4                  ment with jurisdiction over the area in
5                  which the dam is located has’’; and
6                       (v) in subparagraph (C), by striking
7                  ‘‘50-year period’’ and inserting ‘‘expected
8                  life of the dam’’; and
9                  (C) by adding at the end the following:
10           ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—Not
11      later than 1 year after the date of enactment of this
12      paragraph, the Administrator, in consultation with
13      the Board, shall publish criteria for hazard mitiga-
14      tion plans required under paragraph (2)(B).’’.
15           (5) FLOODPLAIN MANAGEMENT PLANS.—Section
16      8A(e) of the National Dam Safety Program Act (33
17      U.S.C. 467f–2(e)) is amended—
18                 (A) in paragraph (1)—
19                      (i) in the matter preceding subpara-
20                 graph (A), by striking ‘‘the non-Federal
21                 sponsor’’ and inserting ‘‘an eligible sub-
22                 recipient’’; and
23                      (ii) in subparagraph (B), by striking
24                 ‘‘1 year’’ and inserting ‘‘2 years’’ each place
25                 it appears; and


     •S 1811 EAH
                                 82
 1                   (B) by striking paragraph (3) and inserting
 2            the following:
 3            ‘‘(3) PLAN       CRITERIA    AND   TECHNICAL   SUP-

 4       PORT.—The Administrator, in consultation with the

 5       Board, shall provide criteria, and may provide tech-
 6       nical support, for the development and implementa-
 7       tion of floodplain management plans prepared under
 8       this subsection.’’.
 9            (6)       CONTRACTUAL       REQUIREMENTS.—Section

10       8A(i)(1) of the National Dam Safety Program Act
11       (33 U.S.C. 467f–2(i)(1)) is amended by striking ‘‘a
12       non-Federal sponsor’’ and inserting ‘‘an eligible sub-
13       recipient’’.
14   SEC. 133. REHABILITATION OF CORPS OF ENGINEERS CON-

15                  STRUCTED PUMP STATIONS.

16       (a) DEFINITIONS.—In this section:
17            (1) ELIGIBLE PUMP STATION.—The term ‘‘eligi-
18       ble pump station’’ means a pump station—
19                   (A) constructed, in whole or in part, by the
20            Corps of Engineers for flood risk management
21            purposes;
22                   (B) that the Secretary has identified as hav-
23            ing a major deficiency; and
24                   (C) the failure of which the Secretary has
25            determined would impair the function of a flood


      •S 1811 EAH
                              83
1            risk management project constructed by the
2            Corps of Engineers.
3            (2) REHABILITATION.—
 4                 (A) IN GENERAL.—The term ‘‘rehabilita-
 5           tion’’, with respect to an eligible pump station,
 6           means to address a major deficiency of the eligi-
 7           ble pump station caused by long-term degrada-
 8           tion of the foundation, construction materials, or
 9           engineering systems or components of the eligible
10           pump station.
11                 (B) INCLUSIONS.—The term ‘‘rehabilita-
12           tion’’, with respect to an eligible pump station,
13           includes—
14                     (i) the incorporation into the eligible
15                 pump station of—
16                           (I) current design standards;
17                           (II) efficiency improvements; and
18                           (III) associated drainage; and
19                     (ii) increasing the capacity of the eligi-
20                 ble pump station, subject to the condition
21                 that the increase shall—
22                           (I) significantly decrease the risk
23                     of loss of life and property damage; or




     •S 1811 EAH
                               84
 1                           (II) decrease total lifecycle reha-
 2                      bilitation costs for the eligible pump
 3                      station.
 4       (b) AUTHORIZATION.—The Secretary may carry out
 5 rehabilitation of an eligible pump station, if the Secretary
 6 determines that the rehabilitation is feasible.
 7       (c) COST SHARING.—The non-Federal interest for the
 8 eligible pump station shall—
 9            (1) provide 35 percent of the cost of rehabilita-
10       tion of an eligible pump station carried out under
11       this section; and
12            (2) provide all land, easements, rights-of-way,
13       and necessary relocations associated with the rehabili-
14       tation described in subparagraph (A), at no cost to
15       the Federal Government.
16       (d) AGREEMENT REQUIRED.—The rehabilitation of an
17 eligible pump station pursuant to this section shall be initi-
18 ated only after a non-Federal interest has entered into a
19 binding agreement with the Secretary—
20            (1) to pay the non-Federal share of the costs of
21       rehabilitation under subsection (c); and
22            (2) to pay 100 percent of the operation and
23       maintenance costs of the rehabilitated eligible pump
24       station, in accordance with regulations promulgated
25       by the Secretary.


      •S 1811 EAH
                                 85
 1       (e) TREATMENT.—The rehabilitation of an eligible
 2 pump station pursuant to this section shall not be consid-
 3 ered to be a separable element of the associated flood risk
 4 management project constructed by the Corps of Engineers.
 5       (f) AUTHORIZATION OF APPROPRIATIONS.—There is
 6 authorized to be appropriated to carry out this section
 7 $60,000,000, to remain available until expended.
 8   SEC. 134. NON-FEDERAL PROJECT IMPLEMENTATION PILOT

 9                  PROGRAM.

10       (a)   REAUTHORIZATION;       IMPLEMENTATION      GUID-
11   ANCE.—Section 1043(b) of the Water Resources Reform and

12 Development Act of 2014 (33 U.S.C. 2201 note) is amend-
13 ed—
14             (1) in paragraph (7), by striking ‘‘the date that
15       is 5 years after the date of enactment of this Act’’ and
16       inserting ‘‘September 30, 2026’’;
17             (2) in paragraph (8), by striking ‘‘2023’’ and in-
18       serting ‘‘2026’’; and
19             (3) by adding at the end the following:
20             ‘‘(9) IMPLEMENTATION GUIDANCE.—
21                   ‘‘(A) IN    GENERAL.—Not    later than 120
22             days after the date of enactment of this para-
23             graph, the Secretary shall issue guidance for the
24             implementation of the pilot program that, to the
25             extent practicable, identifies—


      •S 1811 EAH
                               86
 1                       ‘‘(i) the metrics for measuring the suc-
 2                 cess of the pilot program;
 3                       ‘‘(ii) a process for identifying future
 4                 projects to participate in the pilot program;
 5                       ‘‘(iii) measures to address the risks of
 6                 a non-Federal interest constructing projects
 7                 under the pilot program, including which
 8                 entity bears the risk for projects that fail to
 9                 meet the Corps of Engineers standards for
10                 design or quality;
11                       ‘‘(iv) the laws and regulations that a
12                 non-Federal interest must follow in car-
13                 rying out a project under the pilot program;
14                 and
15                       ‘‘(v) which entity bears the risk in the
16                 event that a project carried out under the
17                 pilot program fails to be carried out in ac-
18                 cordance with the project authorization or
19                 this subsection.
20                 ‘‘(B) NEW PROJECT PARTNERSHIP AGREE-
21           MENTS.—The      Secretary may not enter into a
22           project partnership agreement under this sub-
23           section during the period beginning on the date
24           of enactment of this paragraph and ending on




     •S 1811 EAH
                                87
 1           the date on which the Secretary issues the guid-
 2           ance under subparagraph (A).’’.
 3      (b) NON-FEDERAL PROJECT IMPLEMENTATION FOR
 4 COMPREHENSIVE        EVERGLADES       RESTORATION     PLAN
 5 PROJECTS.—
 6           (1) IN GENERAL.—In carrying out the pilot pro-
 7      gram authorized under section 1043(b) of the Water
 8      Resources Reform and Development Act of 2014 (33
 9      U.S.C. 2201 note), the Secretary is authorized to in-
10      clude a project authorized to be implemented by, or
11      in accordance with, section 601 of the Water Re-
12      sources Development Act of 2000, in accordance with
13      such section 1043(b).
14           (2) ELIGIBILITY.—In the case of a project de-
15      scribed in paragraph (1) for which the non-Federal
16      interest has initiated construction in compliance with
17      authorities governing the provision of in-kind con-
18      tributions for such project, the Secretary shall take
19      into account the value of any in-kind contributions
20      carried out by the non-Federal interest for such
21      project prior to the date of execution of the project
22      partnership agreement under section 1043(b) of the
23      Water Resources Reform and Development Act of
24      2014 when determining the non-Federal share of the
25      costs to complete construction of the project.


     •S 1811 EAH
                                88
 1            (3) GUIDANCE.—Not later than 180 days after
 2       the date of enactment of this subsection, and in ac-
 3       cordance with the guidance issued under section
 4       1043(b)(9) of the Water Resources Reform and Devel-
 5       opment Act of 2014 (as added by this section), the
 6       Secretary shall issue any additional guidance that the
 7       Secretary determines necessary for the implementa-
 8       tion of this subsection.
 9   SEC. 135. COST SHARING PROVISIONS FOR TERRITORIES

10                   AND INDIAN TRIBES.

11       Section 1156(b) of the Water Resources Development
12 Act of 1986 (33 U.S.C. 2310(b)) is amended by striking
13 ‘‘for inflation’’ and all that follows through the period at
14 the end and inserting ‘‘on an annual basis for inflation.’’.
15   SEC. 136. REVIEW OF CONTRACTING POLICIES.

16       (a) REVIEW OF CONTRACTUAL AGREEMENTS.—
17            (1) IN GENERAL.—Not later than 180 days after
18       the date of enactment of this section, the Secretary
19       shall complete a review of the policies, guidelines, and
20       regulations of the Corps of Engineers for the develop-
21       ment of contractual agreements between the Secretary
22       and non-Federal interests and utilities associated
23       with the construction of water resources development
24       projects.




      •S 1811 EAH
                                89
 1             (2) REPORT.—Not later than 90 days after com-
 2       pleting the review under subsection (a)(1), the Sec-
 3       retary shall submit to the Committee on Transpor-
 4       tation and Infrastructure of the House of Representa-
 5       tives and the Committee on Environment and Public
 6       Works of the Senate, and make publicly available, a
 7       report that includes—
 8                   (A) a summary of the results of the review;
 9             and
10                   (B) public guidance on best practices for a
11             non-Federal interest to use when writing or de-
12             veloping contractual agreements with the Sec-
13             retary and utilities.
14             (3) PROVISION     OF GUIDANCE.—The     Secretary
15       shall provide the best practices guidance included
16       under paragraph (2)(A) to non-Federal interests
17       prior to the development of contractual agreements
18       with such non-Federal interests.
19       (b) SENSE OF CONGRESS.—It is the sense of Congress
20 that the Secretary should maximize use of nonprice tradeoff
21 procedures in competitive acquisitions for carrying out
22 emergency work in an area with respect to which the Presi-
23 dent has declared a major disaster under section 401 of the
24 Robert T. Stafford Disaster Relief and Emergency Assist-
25 ance Act.


      •S 1811 EAH
                                90
 1   SEC. 137. CRITERIA FOR FUNDING ENVIRONMENTAL INFRA-

 2                  STRUCTURE PROJECTS.

 3        (a) IN GENERAL.—Not later than 180 days after the
 4 date of enactment of this Act, the Secretary shall develop
 5 specific criteria for the evaluation and ranking of indi-
 6 vidual environmental assistance projects authorized by
 7 Congress (including projects authorized pursuant to envi-
 8 ronmental assistance programs) for the Secretary to carry
 9 out.
10        (b) MINIMUM CRITERIA.—For the purposes of carrying
11 out this section, the Secretary shall evaluate, at a min-
12 imum—
13            (1) the nature and extent of the positive and neg-
14        ative local economic impacts of the project, includ-
15        ing—
16                   (A) the benefits of the project to the local
17            economy;
18                   (B) the extent to which the project will en-
19            hance local development;
20                   (C) the number of jobs that will be directly
21            created by the project; and
22                   (D) the ability of the non-Federal interest to
23            pay the applicable non-Federal share of the cost
24            of the project;




      •S 1811 EAH
                                91
 1            (2) the demographics of the location in which the
 2       project is to be carried out, including whether the
 3       project serves—
 4                   (A) a rural community; or
 5                   (B) an economically disadvantaged commu-
 6            nity, including an economically disadvantaged
 7            minority community;
 8            (3) the amount of appropriations a project has
 9       received;
10            (4) the funding capability of the Corps of Engi-
11       neers with respect to the project;
12            (5) whether the project could be carried out
13       under other Federal authorities at an equivalent cost
14       to the non-Federal interest; and
15            (6) any other criteria that the Secretary con-
16       siders to be appropriate.
17       (c) INCLUSION IN GUIDANCE.—The Secretary shall in-
18 clude the criteria developed under subsection (a) in the an-
19 nual Civil Works Direct Program Development Policy
20 Guidance of the Secretary.
21       (d) REPORT TO CONGRESS.—For fiscal year 2022, and
22 biennially thereafter, in conjunction with the President’s
23 annual budget submission to Congress under section
24 1105(a) of title 31, United States Code, the Secretary shall
25 submit to the Committee on Environment and Public Works


      •S 1811 EAH
                                   92
 1 and the Committee on Appropriations of the Senate and
 2 the Committee on Transportation and Infrastructure and
 3 the Committee on Appropriations of the House of Rep-
 4 resentatives a report that identifies the Secretary’s ranking
 5 of individual environmental assistance projects authorized
 6 by Congress for the Secretary to carry out, in accordance
 7 with the criteria developed under this section.
 8   SEC. 138. AGING INFRASTRUCTURE.

 9       (a) DEFINITIONS.—In this section:
10              (1) AGING INFRASTRUCTURE.—The term ‘‘aging
11       infrastructure’’ means a water resources development
12       project of the Corps of Engineers, or any other water
13       resources, water storage, or irrigation project of an-
14       other Federal agency, that is greater than 75 years
15       old.
16              (2) ENHANCED        INSPECTION.—The   term ‘‘en-
17       hanced inspection’’ means an inspection that uses
18       current or innovative technology, including Light De-
19       tection    and    Ranging      (commonly     known   as
20       ‘‘LiDAR’’), ground penetrating radar, subsurface im-
21       aging, or subsurface geophysical techniques, to detect
22       whether the features of the aging infrastructure are
23       structurally sound and can operate as intended, or
24       are at risk of failure.
25       (b) CONTRACTS FOR ENHANCED INSPECTION.—


      •S 1811 EAH
                                 93
 1            (1) IN GENERAL.—The Secretary may carry out
 2       enhanced inspections of aging infrastructure, pursu-
 3       ant to a contract with the owner or operator of the
 4       aging infrastructure.
 5            (2) CERTAIN CIRCUMSTANCES.—Subject to the
 6       availability of appropriations, or funds available
 7       pursuant to subsection (d), the Secretary shall enter
 8       into a contract described in paragraph (1), if—
 9                  (A) the owner or operator of the aging in-
10            frastructure requests that the Secretary carry out
11            the enhanced inspections; and
12                  (B) the inspection is at the full expense of
13            such owner or operator.
14       (c) LIMITATION.—The Secretary shall not require a
15 non-Federal entity associated with a project under the ju-
16 risdiction of another Federal agency to carry out corrective
17 or remedial actions in response to an enhanced inspection
18 carried out under this section.
19       (d) FUNDING.—The Secretary is authorized to accept
20 funds from an owner or operator of aging infrastructure,
21 and may use such funds to carry out an enhanced inspec-
22 tion pursuant to a contract entered into with such owner
23 or operator under this section.




      •S 1811 EAH
                               94
 1   SEC. 139. UNIFORMITY OF NOTIFICATION SYSTEMS.

 2       (a) INVENTORY.—Not later than 180 days after the
 3 date of enactment of this Act, the Secretary shall complete
 4 an inventory of all systems used by the Corps of Engineers
 5 for external communication and notification with respect
 6 to projects, initiatives, and facilities of the Corps of Engi-
 7 neers.
8        (b) UNIFORM PLAN.—
 9            (1) IN GENERAL.—Not later than 1 year after
10       the date of enactment of this Act, the Secretary shall
11       develop a plan for the uniformity of such communica-
12       tion and notification systems for projects, initiatives,
13       and facilities of the Corps of Engineers.
14            (2) INCLUSIONS.—The plan developed under
15       paragraph (1) shall—
16                  (A) provide access to information in all
17            forms practicable, including through email, text
18            messages, news programs and websites, radio,
19            and other forms of notification;
20                  (B) establish a notification system for any
21            projects, initiatives, or facilities of the Corps of
22            Engineers that do not have a notification system;
23                  (C) streamline existing communication and
24            notification systems to improve the strength and
25            uniformity of those systems; and


      •S 1811 EAH
                                95
 1                   (D) emphasize the necessity of timeliness in
 2            notification systems and ensure that the methods
 3            of notification can transmit information in a
 4            timely manner.
 5            (3) IMPLEMENTATION.—
 6                   (A) IN GENERAL.—Except as provided in
 7            subparagraph (B), not later than 2 years after
 8            the date of enactment of this Act, the Secretary
 9            shall complete the implementation of the plan de-
10            veloped under paragraph (1).
11                   (B) EMERGENCY      MANAGEMENT NOTIFICA-

12            TION.—Not later than 18 months after the date

13            of enactment of this Act, the Secretary shall im-
14            plement the provisions of the plan developed
15            under paragraph (1) relating to emergency man-
16            agement notifications.
17            (4) SAVINGS PROVISION.—Nothing in this section
18       authorizes the elimination of any existing commu-
19       nication or notification system used by the Corps of
20       Engineers.
21   SEC. 140. COASTAL STORM DAMAGE REDUCTION CON-

22                  TRACTS.

23       For any project for coastal storm damage reduction,
24 the Secretary may seek input from a non-Federal interest
25 for a project that may be affected by the timing of the coast-


      •S 1811 EAH
                                  96
1 al storm damage reduction activities under the project, in
2 order to minimize, to the maximum extent practicable, any
3 negative effects resulting from the timing of those activities.
 4   SEC. 141. DAM REMEDIATION FOR ECOSYSTEM RESTORA-

 5                  TION.

 6       Section 542(b)(2) of the Water Resources Development
 7 Act of 2000 (114 Stat. 2671; 121 Stat. 1150) is amended—
 8              (1) in subparagraph (F), by striking ‘‘or’’ at the
 9       end;
10              (2) by redesignating subparagraph (G) as sub-
11       paragraph (H); and
12              (3) by inserting after subparagraph (F) the fol-
13       lowing:
14                   ‘‘(G) measures to restore, protect, and pre-
15              serve an ecosystem affected by a dam (including
16              by the rehabilitation or modification of a
17              dam)—
18                          ‘‘(i) that has been constructed, in whole
19                   or in part, by the Corps of Engineers for
20                   flood control purposes;
21                          ‘‘(ii) for which construction was com-
22                   pleted before 1940;
23                          ‘‘(iii) that is classified as ‘high hazard
24                   potential’ by the State dam safety agency of
25                   the State in which the dam is located; and


      •S 1811 EAH
                                     97
 1                        ‘‘(iv) that is operated by a non-Federal
 2                   entity; or’’.
 3   SEC. 142. LEVEE ACCREDITATION PROCESS; LEVEE CER-

 4                  TIFICATIONS.

 5       (a) SENSE OF CONGRESS.—It is the sense of Congress
 6 that the process developed by the Flood Protection Structure
 7 Accreditation Task Force established under section 100226
 8 of the Moving Ahead for Progress in the 21st Century Act
 9 (42 U.S.C. 4101 note) should not be limited to levee systems
10 in the inspection of completed works program of the Corps
11 of Engineers, but should apply equally to federally owned
12 levee systems operated by the Secretary, including federally
13 owned levee systems operated by the Secretary as part of
14 a reservoir project.
15       (b) LEVEE CERTIFICATIONS.—Section 3014 of the
16 Water Resources Reform and Development Act of 2014 (42
17 U.S.C. 4131) is amended—
18            (1) in subsection (a)—
19                   (A) in paragraph (1)—
20                        (i) by striking ‘‘under the inspection of
21                   completed works program’’ and inserting
22                   ‘‘for levee systems under the levee safety and
23                   dam safety programs’’; and
24                        (ii) by striking ‘‘and’’ at the end;
25                   (B) in paragraph (2)—


      •S 1811 EAH
                                  98
 1                          (i) by striking ‘‘activities under the in-
 2                  spection of completed works program of the
 3                  Corps of Engineers’’ and inserting ‘‘the ac-
 4                  tivities referred to in paragraph (1)’’;
 5                          (ii) by striking ‘‘chapter 1’’ and insert-
 6                  ing ‘‘chapter I’’; and
 7                          (iii) by striking the period at the end
 8                  and inserting ‘‘; and’’; and
 9                  (C) by adding at the end the following:
10            ‘‘(3) in the case of a levee system that is operated
11       and maintained by the Corps of Engineers, to the
12       maximum extent practicable, cooperate with local
13       governments seeking a levee accreditation decision for
14       the levee to provide information necessary to support
15       the accreditation decision in a timely manner.’’; and
16            (2) in paragraph (b)(3), by adding at the end
17       the following:
18                  ‘‘(C)      CONTRIBUTED        FUNDS.—Notwith-

19            standing subparagraph (B), a non-Federal inter-
20            est may fund up to 100 percent of the cost of any
21            activity carried out under this subsection.’’.
22   SEC. 143. PROJECT PARTNERSHIP AGREEMENT.

23       Section 103(j)(1) of the Water Resources Development
24 Act of 1986 (33 U.S.C. 2213(j)(1)) is amended—




      •S 1811 EAH
                                99
 1            (1) by striking ‘‘Any project’’ and inserting the
 2       following:
 3                    ‘‘(A) IN GENERAL.—Any project’’; and
 4            (2) by adding at the end the following:
 5                    ‘‘(B) INCLUSION.—An agreement under sub-
 6            paragraph (A) shall include a brief description
 7            and estimation of the anticipated operations,
 8            maintenance, and replacement and rehabilita-
 9            tion costs of the non-Federal interest for the
10            project.’’.
11   SEC. 144. ACCEPTANCE OF FUNDS FOR HARBOR DREDGING.

12       The Secretary is authorized, in accordance with sec-
13 tion 5 of Act of June 22, 1936 (33 U.S.C. 701h), to accept
14 and expend funds contributed by a State or other non-Fed-
15 eral interest—
16            (1) to dredge a non-Federal harbor or channel,
17       or a marina or berthing area located adjacent to, or
18       accessible by, such harbor or channel; or
19            (2) to provide technical assistance related to the
20       planning and design of dredging activities described
21       in paragraph (1).
22   SEC. 145. REPLACEMENT CAPACITY.

23       Section 217(a) of the Water Resources Development
24 Act of 1996 (33 U.S.C. 2326a(a)) is amended—




      •S 1811 EAH
                                 100
 1           (1) in the subsection heading, by inserting ‘‘OR
 2      REPLACEMENT CAPACITY’’ after ‘‘ADDITIONAL CAPAC-
 3      ITY’’;

 4           (2) by striking paragraph (1) and inserting the
 5      following:
 6           ‘‘(1) PROVIDED BY SECRETARY.—
 7                   ‘‘(A) IN    GENERAL.—Subject     to subpara-
 8           graph (B), at the request of a non-Federal inter-
 9           est with respect to a project, the Secretary
10           may—
11                        ‘‘(i) provide additional capacity at a
12                   dredged material disposal facility con-
13                   structed by the Secretary beyond the capac-
14                   ity that would be required for project pur-
15                   poses; or
16                        ‘‘(ii) permit the use of dredged mate-
17                   rial disposal facility capacity required for
18                   project purposes by the non-Federal interest
19                   if the Secretary determines that replacement
20                   capacity can be constructed at the facility
21                   or another facility or site before such capac-
22                   ity is needed for project purposes.
23                   ‘‘(B) AGREEMENT.—Before the Secretary
24           takes an action under subparagraph (A), the
25           non-Federal interest shall agree to pay—


     •S 1811 EAH
                                101
 1                         ‘‘(i) all costs associated with the con-
 2                 struction of the additional capacity or re-
 3                 placement capacity in advance of construc-
 4                 tion of such capacity; and
 5                         ‘‘(ii) in the case of use by a non-Fed-
 6                 eral interest of dredged material disposal
 7                 capacity required for project purposes under
 8                 subparagraph (A)(ii), any increase in the
 9                 cost of operation and maintenance of the
10                 project that the Secretary determines results
11                 from the use of the project capacity by the
12                 non-Federal interest in advance of each
13                 cycle of dredging.
14                 ‘‘(C) CREDIT.—In the event the Secretary
15           determines that the cost to operate or maintain
16           the project decreases as a result of use by the
17           non-Federal interest of dredged material disposal
18           capacity required for project purposes under sub-
19           paragraph (A)(ii), the Secretary, at the request
20           of the non-Federal interest, shall credit the
21           amount of the decrease toward any cash con-
22           tribution of the non-Federal interest required
23           thereafter for construction, operation, or mainte-
24           nance of the project, or of another navigation
25           project.’’;


     •S 1811 EAH
                                102
1            (3) in paragraph (2), in the first sentence, by in-
2       serting ‘‘under paragraph (1)(A)(i)’’ after ‘‘additional
3       capacity’’; and
4            (4) by adding at the end the following:
 5           ‘‘(3) SPECIAL RULE FOR DESIGNATION OF RE-
 6      PLACEMENT CAPACITY FACILITY OR SITE.—

 7                 ‘‘(A) IN GENERAL.—Subject to such terms
 8           and conditions as the Secretary determines to be
 9           necessary or advisable, an agreement under
10           paragraph (1)(B) for use permitted under para-
11           graph (1)(A)(ii) shall reserve to the non-Federal
12           interest—
13                        ‘‘(i) the right to submit to the Sec-
14                 retary for approval at a later date an alter-
15                 native to the facility or site designated in
16                 the agreement for construction of replace-
17                 ment capacity; and
18                        ‘‘(ii) the right to construct the replace-
19                 ment capacity at the alternative facility or
20                 site at the expense of the non-Federal inter-
21                 est.
22                 ‘‘(B) REQUIREMENT.—The Secretary shall
23           not reject a site for the construction of replace-
24           ment capacity under paragraph (1)(A)(ii) that
25           is submitted by the non-Federal interest for ap-


     •S 1811 EAH
                                103
 1             proval by the Secretary before the date of execu-
 2             tion of the agreement under paragraph (1)(B),
 3             or thereafter, unless the Secretary—
 4                        ‘‘(i) determines that the site is environ-
 5                   mentally unacceptable, geographically unac-
 6                   ceptable, or technically unsound; and
 7                        ‘‘(ii) provides a written basis for the
 8                   determination under clause (i) to the non-
 9                   Federal interest.
10             ‘‘(4) PUBLIC COMMENT.—The Secretary shall af-
11       ford the public an opportunity to comment on the de-
12       terminations required under this subsection for a use
13       permitted under paragraph (1)(A)(ii).’’.
14   SEC. 146. REVIEWING HYDROPOWER AT CORPS OF ENGI-

15                  NEERS FACILITIES.

16       Section 1008 of the Water Resources Reform and De-
17 velopment Act of 2014 (33 U.S.C. 2321b) is amended—
18             (1) by striking ‘‘civil works’’ each place it ap-
19       pears and inserting ‘‘water resources development’’;
20       and
21             (2) by adding at the end the following:
22       ‘‘(c) REVIEWING HYDROPOWER AT CORPS OF ENGI-
23   NEERS FACILITIES.—

24             ‘‘(1) DEFINITION OF ELIGIBLE NON-FEDERAL IN-
25       TEREST.—In this subsection, the term ‘eligible non-



      •S 1811 EAH
                             104
 1      Federal interest’ means a non-Federal interest that
 2      owns or operates an existing non-Federal hydropower
 3      facility at a Corps of Engineers water resources devel-
 4      opment project.
 5           ‘‘(2) EVALUATION.—
 6                 ‘‘(A) IN GENERAL.—On the written request
 7           of an eligible non-Federal interest, the Secretary
 8           shall conduct an evaluation to consider oper-
 9           ational changes at the applicable project to fa-
10           cilitate production of non-Federal hydropower,
11           consistent with authorized project purposes. The
12           Secretary shall solicit input from interested
13           stakeholders as part of the evaluation.
14                 ‘‘(B) DEADLINE.—Not later than 180 days
15           after the date on which the Secretary receives a
16           written request under subparagraph (A), the Sec-
17           retary shall provide to the non-Federal interest a
18           written response to inform the non-Federal inter-
19           est—
20                     ‘‘(i) that the Secretary has approved
21                 the request to conduct an evaluation; or
22                     ‘‘(ii) of any additional information
23                 necessary for the Secretary to approve the
24                 request to conduct an evaluation.




     •S 1811 EAH
                              105
 1           ‘‘(3) OPERATIONAL CHANGES.—An operational
 2      change referred to in paragraph (2)(A) may in-
 3      clude—
 4                 ‘‘(A) changes to seasonal pool levels;
 5                 ‘‘(B) modifying releases from the project;
 6           and
 7                 ‘‘(C) other changes included in the written
 8           request submitted under that paragraph that en-
 9           hance the usage of the project to facilitate pro-
10           duction of non-Federal hydropower, consistent
11           with authorized project purposes.
12           ‘‘(4) COST SHARE.—The eligible non-Federal in-
13      terest shall pay 100 percent of the costs associated
14      with an evaluation under this subsection, including
15      the costs to prepare the report under paragraph (6).
16           ‘‘(5) DEADLINE.—The Secretary shall complete
17      an evaluation under this subsection by the date that
18      is not later than 1 year after the date on which the
19      Secretary begins the evaluation.
20           ‘‘(6) REPORT.—On completion of an evaluation
21      under this subsection, the Secretary shall submit to
22      the Committee on Environment and Public Works of
23      the Senate and the Committee on Transportation and
24      Infrastructure of the House of Representatives a re-
25      port on the effects of the operational changes proposed


     •S 1811 EAH
                               106
 1       by the non-Federal interest and examined in the eval-
 2       uation on the authorized purposes of the project, in-
 3       cluding a description of any negative impacts of the
 4       proposed operational changes on the authorized pur-
 5       poses of the project, or on any Federal project located
 6       in the same basin.
 7            ‘‘(7) SAVINGS PROVISION.—Nothing in this sub-
 8       section—
 9                  ‘‘(A) affects the authorized purposes of a
10            Corps of Engineers water resources development
11            project;
12                  ‘‘(B) affects existing authorities of the Corps
13            of Engineers, including authorities with respect
14            to navigation, flood damage reduction, environ-
15            mental protection and restoration, water supply
16            and conservation, and other related purposes; or
17                  ‘‘(C) authorizes the Secretary to make any
18            operational changes to a Corps of Engineers
19            water resources development project.’’.
20   SEC. 147. REPAIR AND RESTORATION OF EMBANKMENTS.

21       (a) IN GENERAL.—At the request of a non-Federal in-
22 terest, the Secretary shall assess the cause of damage to, or
23 the failure of, an embankment that is adjacent to the shore-
24 line of a reservoir project owned and operated by the Sec-
25 retary for which such damage or failure to the embankment


      •S 1811 EAH
                                107
 1 has adversely affected a roadway that the Secretary has re-
 2 located for construction of the reservoir.
 3       (b) REPAIR AND RESTORATION ACTIVITIES.—If, based
 4 on the assessment carried out under subsection (a), the Sec-
 5 retary determines that the cause of the damage to, or the
 6 failure of, the embankment is the direct result of the design
 7 or operation of the reservoir by the Secretary, the Secretary
 8 is authorized to participate in the repair or restoration of
 9 such embankment.
10       (c) AUTHORIZATION OF APPROPRIATIONS.—There is
11 authorized to be appropriated to the Secretary $10,000,000
12 to carry out this section.
13   SEC. 148. COASTAL MAPPING.

14       Section 516 of the Water Resources Development Act
15 of 1996 (33 U.S.C. 2326b) is amended—
16              (1) by redesignating subsection (g) as subsection
17       (h);
18              (2) by inserting after subsection (f) the following:
19       ‘‘(g) COASTAL MAPPING.—The Secretary shall develop
20 and carry out a plan for the recurring mapping of coast-
21 lines that are experiencing rapid change, including such
22 coastlines in—
23              ‘‘(1) Alaska;
24              ‘‘(2) Hawaii; and




      •S 1811 EAH
                               108
 1             ‘‘(3) any territory or possession of the United
 2       States.’’; and
 3             (3) in subsection (h) (as so redesignated), by
 4       adding at the end the following:
 5             ‘‘(3)   COASTAL    MAPPING.—In     addition     to
 6       amounts made available under paragraph (1), there
 7       is authorized to be appropriated to carry out sub-
 8       section (g) with respect to Alaska, Hawaii, and the
 9       territories and possessions of the United States,
10       $10,000,000, to remain available until expended.’’.
11   SEC. 149. INTERIM RISK REDUCTION MEASURES.

12       (a) IN GENERAL.—In the case of any interim risk re-
13 duction measure for dam safety purposes that was evaluated
14 in a final environmental assessment completed during the
15 period beginning on March 18, 2019, and ending on the
16 date of enactment of this Act, the Secretary shall carry out
17 a reevaluation of the measure in a timely manner if the
18 final environmental assessment did not consider in detail
19 at least—
20             (1) 1 operational water control plan change al-
21       ternative;
22             (2) 1 action alternative other than an oper-
23       ational water control plan change; and
24             (3) the no action alternative.




      •S 1811 EAH
                              109
 1       (b) COORDINATION.—A reevaluation carried out under
 2 subsection (a) shall include consideration of the alternatives
 3 described in such subsection, which shall be developed in
 4 coordination with Federal agencies, States, Indian Tribes,
 5 units of local government, and other non-Federal interests
 6 that have existing water obligations that would be directly
 7 affected by implementation of an interim risk reduction
 8 measure that is the subject of the reevaluation.
 9       (c) IMPLEMENTATION PRIOR TO REEVALUATION.—
10 Nothing in this section prohibits the Secretary from imple-
11 menting an interim risk reduction measure for which a re-
12 evaluation is required under subsection (a) prior to the
13 completion of the reevaluation under subsection (a).
14   SEC. 150. MAINTENANCE DREDGING PERMITS.

15       (a) IN GENERAL.—The Secretary shall, to the max-
16 imum extent practicable, prioritize the reissuance of any
17 regional general permit for maintenance dredging that ex-
18 pires prior to May 1, 2021, and shall use best efforts to
19 ensure such reissuance prior to expiration of such a re-
20 gional general permit for maintenance dredging.
21       (b) SAVINGS PROVISION.—Nothing in this section af-
22 fects any obligation to comply with the requirements of any
23 Federal law, including—
24            (1) the National Environmental Policy Act of
25       1969 (42 U.S.C. 4321 et seq.);


      •S 1811 EAH
                                 110
 1            (2) the Federal Water Pollution Control Act (33
 2       U.S.C. 1251 et seq.); and
 3            (3) the Endangered Species Act of 1973 (16
 4       U.S.C. 1531 et seq.).
 5   SEC. 151. HIGH WATER-LOW WATER PREPAREDNESS.

 6       (a) DEFINITIONS.—In this section:
 7            (1) BYPASS.—The term ‘‘bypass’’ means an al-
 8       ternate water route adjacent to a lock and dam on a
 9       Federal inland waterway system that can be used for
10       commercial navigation during high water conditions.
11            (2) EMERGENCY CONDITION.—The term ‘‘emer-
12       gency condition’’ means—
13                  (A) unsafe conditions on a Federal inland
14            waterway system that prevent the operation of
15            commercial vessels, resulting from a major
16            change in water level or flows;
17                  (B) an obstruction in a Federal inland wa-
18            terway system, including silt, sediment, rock for-
19            mation, or a shallow channel;
20                  (C) an impaired or inoperable Federal lock
21            and dam; or
22                  (D) any other condition determined appro-
23            priate by the Secretary.
24       (b) EMERGENCY DETERMINATION.—The Secretary, in
25 consultation with the District Commanders responsible for


      •S 1811 EAH
                               111
 1 maintaining any Federal inland waterway system, the
 2 users of the waterway system, and the Coast Guard, may
 3 make a determination that an emergency condition exists
 4 on the waterway system.
 5      (c) EMERGENCY MITIGATION PROJECT.—
 6           (1) IN GENERAL.—Subject to paragraph (2) and
 7      the availability of appropriations, and in accordance
 8      with all applicable Federal requirements, the Sec-
 9      retary may carry out an emergency mitigation
10      project on a Federal inland waterway system with re-
11      spect to which the Secretary has determined that an
12      emergency condition exists under subsection (b), or on
13      a bypass of such system, to remedy that emergency
14      condition.
15           (2)      DEADLINE.—An      emergency    mitigation
16      project under paragraph (1) shall—
17                   (A) be initiated by not later than 60 days
18           after the date on which the Secretary makes the
19           applicable determination under subsection (b);
20           and
21                   (B) to the maximum extent practicable, be
22           completed by not later than 1 year after the date
23           on which the Secretary makes such determina-
24           tion.




     •S 1811 EAH
                              112
 1       (d) AUTHORIZATION OF APPROPRIATIONS.—There is
 2 authorized to be appropriated to the Secretary to carry out
 3 this section $25,000,000 for each of fiscal years 2022
 4 through 2024, to remain available until expended.
 5   SEC. 152. TREATMENT OF CERTAIN BENEFITS AND COSTS.

 6       (a) IN GENERAL.—In the case of a flood risk manage-
 7 ment project that incidentally generates seismic safety bene-
 8 fits in regions of moderate or high seismic hazard, for the
 9 purpose of a benefit-cost analysis for the project, the Sec-
10 retary shall not include in that analysis any additional de-
11 sign and construction costs resulting from addressing seis-
12 mic concerns.
13       (b) SAVINGS PROVISION.—Except with respect to the
14 benefit-cost analysis, the additional costs referred to in sub-
15 section (a) shall be—
16            (1) included in the total project cost; and
17            (2) subject to cost-share requirements otherwise
18       applicable to the project.
19   SEC. 153. LEASE DEVIATIONS.

20       (a) DEFINITION OF COVERED LEASE DEVIATION.—In
21 this section, the term ‘‘covered lease deviation’’ means a
22 change in terms from the existing lease that requires ap-
23 proval from the Secretary for a lease—




      •S 1811 EAH
                              113
 1           (1) of Federal land within the State of Oklahoma
 2      that is associated with a water resources development
 3      project, under—
 4                  (A) section 2667 of title 10, United States
 5           Code; or
 6                  (B) section 4 of the Act of December 22,
 7           1944 (16 U.S.C. 460d); and
 8           (2) with respect to which the lessee is in good
 9      standing.
10      (b) DEADLINE.—In the case of a request for a covered
11 lease deviation—
12           (1) the Division Commander of the Southwestern
13      Division shall—
14                  (A) notify the Secretary of the request via
15           electronic means by not later than 24 hours after
16           receiving the request; and
17                  (B) by not later than 10 business days after
18           the date on which the Division Commander noti-
19           fies the Secretary under subparagraph (A)—
20                      (i) make a determination approving,
21                  denying, or requesting a modification to the
22                  request; and
23                      (ii) provide to the Secretary the deter-
24                  mination under clause (i); and




     •S 1811 EAH
                              114
 1            (2) if the Division Commander does not make a
 2       determination under paragraph (1)(B), the Secretary
 3       shall make a determination approving, denying, or
 4       requesting a modification to the request by not later
 5       than 10 business days after the date on which the
 6       deadline described in paragraph (1)(B) expires.
 7       (c) NOTIFICATION.—If the Secretary does not make a
 8 determination under subsection (b)(2) by the deadline de-
 9 scribed in that subsection, the Secretary shall submit a noti-
10 fication of the failure to make a determination with respect
11 to the covered lease deviation, including the reason for the
12 failure and a description of any outstanding issues, to—
13            (1) the entity seeking the covered lease deviation;
14            (2) the members of the Oklahoma congressional
15       delegation;
16            (3) the Committee on Environment and Public
17       Works of the Senate; and
18            (4) the Committee on Transportation and Infra-
19       structure of the House of Representatives.
20   SEC. 154. SENSE OF CONGRESS ON ARCTIC DEEP DRAFT

21                  PORT DEVELOPMENT.

22       It is the sense of Congress that—
23            (1) the Arctic, as defined in section 112 of the
24       Arctic Research and Policy Act of 1984 (Public Law
25       98–373), is a region of strategic importance to the


      •S 1811 EAH
                             115
 1      national security and maritime transportation inter-
 2      ests of the United States;
 3           (2) there is a compelling national, regional,
 4      Alaska Native, and private sector need for permanent
 5      maritime transportation infrastructure development
 6      and for a presence in the Arctic by the United States
 7      to assert national security interests and to support
 8      and facilitate search and rescue, shipping safety, eco-
 9      nomic development, oil spill prevention and response,
10      subsistence and commercial fishing, the establishment
11      of ports of refuge, Arctic research, and maritime law
12      enforcement;
13           (3) the Government of the Russian Federation
14      has prioritized the development of Arctic maritime
15      transportation capabilities and has made significant
16      investments in military infrastructure in the Arctic,
17      including the construction or refurbishment of 16
18      deepwater ports in the region;
19           (4) is a serious concern that the closest United
20      States strategic seaports to the Arctic are the Port of
21      Anchorage and the Port of Tacoma, located approxi-
22      mately 1,500 nautical miles and 2,400 nautical miles
23      away from the Arctic, respectively, and approxi-
24      mately 1,900 nautical miles and 2,800 nautical miles,
25      respectively, from Utiagvik, Alaska; and


     •S 1811 EAH
                               116
 1            (5) it is in the national interest to enhance exist-
 2       ing, and develop, maritime transportation infrastruc-
 3       ture in the Arctic, including an Arctic deep draft
 4       strategic seaport in Alaska, that would allow the
 5       Coast Guard and the Navy each to perform their re-
 6       spective statutory duties and functions on a perma-
 7       nent basis with minimal mission interruption.
 8   SEC. 155. SMALL WATER STORAGE PROJECTS.

 9       (a) IN GENERAL.—The Secretary shall carry out a
10 program to study and construct new, or enlarge existing,
11 small water storage projects, in partnership with a non-
12 Federal interest.
13       (b) REQUIREMENTS.—To be eligible to participate in
14 the program under this section, a small water storage
15 project shall—
16            (1) in the case of a new small water storage
17       project, have a water storage capacity of not less than
18       2,000 acre-feet and not more than 30,000 acre-feet;
19            (2) in the case of an enlargement of an existing
20       small water storage project, be for an enlargement of
21       not less than 1,000 acre-feet and not more than
22       30,000 acre-feet;
23            (3) provide—
24                  (A) flood risk management benefits;
25                  (B) ecological benefits; or


      •S 1811 EAH
                              117
 1                  (C) water management, water conservation,
 2            or water supply; and
 3            (4) be—
 4                  (A) economically justified, environmentally
 5            acceptable, and technically feasible; or
 6                  (B) in the case of a project providing eco-
 7            logical benefits, cost-effective with respect to such
 8            benefits.
 9       (c) SCOPE.—In carrying out the program under this
10 section, the Secretary shall give preference to a small water
11 storage project located in a State with a population of less
12 than 1,000,000.
13       (d) EXPEDITED PROJECTS.—For the 10-year period
14 beginning on the date of enactment of this Act, the Sec-
15 retary shall expedite small water storage projects under this
16 section for which applicable Federal permitting require-
17 ments have been completed.
18       (e) USE OF DATA.—In conducting a study under this
19 section, to the maximum extent practicable, the Secretary
20 shall—
21            (1) as the Secretary determines appropriate, con-
22       sider and utilize any applicable hydrologic, economic,
23       or environmental data that is prepared for a small
24       water storage project under State law as the docu-
25       mentation, or part of the documentation, required to


      •S 1811 EAH
                               118
1       complete State water plans or other State planning
2       documents relating to water resources management;
3       and
4              (2) consider information developed by the non-
5       Federal interest in relation to another study, to the
6       extent the Secretary determines such information is
7       applicable, appropriate, or otherwise authorized by
8       law.
9       (f) COST SHARE.—
10             (1) STUDY.—The Federal share of the cost of a
11      study conducted under this section shall be—
12                 (A) 100 percent for costs not to exceed
13             $100,000; and
14                 (B) 50 percent for any costs above $100,000.
15             (2) CONSTRUCTION.—A small water storage
16      project carried out under this section shall be subject
17      to the cost-sharing requirements applicable to projects
18      under section 103 of the Water Resources Development
19      Act of 1986 (33 U.S.C. 2213), including—
20                 (A) municipal and industrial water supply:
21             100 percent non-Federal;
22                 (B) agricultural water supply: 35 percent
23             non-Federal; and
24                 (C) recreation, including recreational navi-
25             gation: 50 percent of separable costs and, in the


     •S 1811 EAH
                                119
 1              case of any harbor or inland harbor or channel
 2              project, 50 percent of joint and separable costs
 3              allocated to recreational navigation.
 4       (g) OMRRR RESPONSIBILITY.—The costs of operation,
 5 maintenance, repair, and replacement and rehabilitation
 6 for a small water storage project constructed under this sec-
 7 tion shall be the responsibility of the non-Federal interest.
 8       (h) INDIVIDUAL PROJECT LIMIT.—Not more than
 9 $65,000,000 in Federal funds may be made available to a
10 small water storage project under this section.
11       (i) AUTHORIZATION OF APPROPRIATIONS.—There is
12 authorized to be appropriated to carry out this section
13 $130,000,000 annually through fiscal year 2030.
14   SEC. 156. PLANNING ASSISTANCE TO STATES.

15       In carrying out section 22 of the Water Resources De-
16 velopment Act of 1974 (42 U.S.C. 1962d–16), the Secretary
17 shall provide equal priority for all mission areas of the
18 Corps of Engineers, including water supply and water con-
19 servation.
20   SEC. 157. FORECAST-INFORMED RESERVOIR OPERATIONS.

21       Section 1222 of the Water Resources Development Act
22 of 2018 (128 Stat. 3811) is amended by adding at the end
23 the following:
24       ‘‘(c) ADDITIONAL UTILIZATION          OF   FORECAST-IN-
25   FORMED RESERVOIR OPERATIONS.—



      •S 1811 EAH
                               120
 1           ‘‘(1) IN GENERAL.—Not later than 1 year after
 2      the date of enactment of this subsection, the Secretary
 3      shall submit to the Committee on Transportation and
 4      Infrastructure of the House of Representatives and the
 5      Committee on Environment and Public Works of the
 6      Senate a report on any additional opportunities iden-
 7      tified for utilizing forecast-informed reservoir oper-
 8      ations across the United States, including an assess-
 9      ment of the viability of forecast-informed reservoir op-
10      erations in the Upper Missouri River Basin and the
11      North Platte River Basin.
12           ‘‘(2) FORECAST-INFORMED        RESERVOIR    OPER-

13      ATIONS.—

14                 ‘‘(A) AUTHORIZATION.—If the Secretary de-
15           termines, and includes in the report submitted
16           under paragraph (1), that forecast-informed res-
17           ervoir operations are viable at a reservoir in the
18           Upper Missouri River Basin or the North Platte
19           River Basin, including a reservoir for which the
20           Secretary has flood control responsibilities under
21           section 7 of the Act of December 22, 1944 (33
22           U.S.C. 709), the Secretary is authorized to carry
23           out forecast-informed reservoir operations at
24           such reservoir.




     •S 1811 EAH
                               121
 1                   ‘‘(B) REQUIREMENT.—Subject to the avail-
 2            ability of appropriations, if the Secretary deter-
 3            mines, and includes in the report submitted
 4            under paragraph (1), that forecast-informed res-
 5            ervoir operations are viable in the Upper Mis-
 6            souri River Basin or the North Platte River
 7            Basin, the Secretary shall carry out forecast-in-
 8            formed reservoir operations at not fewer than one
 9            reservoir in such basin.’’.
10   SEC. 158. DATA FOR WATER ALLOCATION, SUPPLY, AND DE-

11                  MAND.

12       (a) STUDY ON DATA FOR WATER ALLOCATION, SUP-
13   PLY, AND DEMAND.—

14            (1) IN GENERAL.—The Secretary shall offer to
15       enter into an agreement with the National Academy
16       of Sciences to conduct a study on the ability of Fed-
17       eral agencies to coordinate with other Federal agen-
18       cies, State and local agencies, Indian Tribes, commu-
19       nities, universities, consortiums, councils, and other
20       relevant entities with expertise in water resources to
21       facilitate and coordinate the sharing among such en-
22       tities of water allocation, supply, and demand data,
23       including—
24                   (A) any catalogs of such data;




      •S 1811 EAH
                             122
1                  (B) definitions of any commonly used terms
2            relating to water allocation, supply, and de-
3            mand; and
4                  (C) a description of any common standards
5            used by those entities.
 6           (2) REPORT.—If the National Academy of
 7      Sciences enters into an agreement under paragraph
 8      (1), to the maximum extent practicable, not later
 9      than 1 year after the date of enactment of this Act,
10      the National Academy of Sciences shall submit to
11      Congress a report that includes—
12                 (A) the results of the study under para-
13           graph (1);
14                 (B) recommendations for ways to stream-
15           line and make cost-effective methods for Federal
16           agencies to coordinate interstate sharing of data,
17           including recommendations for the development
18           of a publicly accessible, internet-based platform
19           that can allow entities described in paragraph
20           (1) to communicate and coordinate ongoing data
21           collection efforts relating to water allocation,
22           supply, and demand, and share best practices re-
23           lating to those efforts; and
24                 (C) a recommendation as to an appropriate
25           Federal entity that should—


     •S 1811 EAH
                              123
 1                      (i) serve as the lead coordinator for the
 2                  sharing of data relating to water allocation,
 3                  supply, and demand; and
 4                      (ii) host and manage the internet-based
 5                  platform described in subparagraph (B).
 6       (b)   DATA    TRANSPARENCY.—The        Secretary   shall
 7 prioritize making publicly available water resources data
 8 in the custody of the Corps of Engineers, as authorized by
 9 section 2017 of the Water Resources Development Act of
10 2007 (33 U.S.C. 2342).
11       (c) FUNDING.—From amounts otherwise appropriated
12 or made available to the Secretary, the Secretary may make
13 available to the National Academy of Sciences not more
14 than $3,900,000, to be used for the review of information
15 provided by the Corps of Engineers for purposes of a study
16 under subsection (a). The Secretary may accept funds from
17 another Federal agency and make such funds available to
18 the National Academy of Sciences, to be used for the review
19 of information provided by such agency for purposes of a
20 study under subsection (a).
21   SEC. 159. INLAND WATERWAYS PILOT PROGRAM.

22       (a) DEFINITIONS.—In this section:
23             (1) AUTHORIZED PROJECT.—The term ‘‘author-
24       ized project’’ means a federally authorized water re-




      •S 1811 EAH
                              124
 1       sources development project for navigation on the in-
 2       land waterways.
 3            (2)   MODERNIZATION      ACTIVITIES.—The     term
 4       ‘‘modernization activities’’ means construction or
 5       major rehabilitation activities for any authorized
 6       project.
 7            (3) NON-FEDERAL INTEREST.—The term ‘‘non-
 8       Federal interest’’ means any public body described in
 9       section 221(b) of the Flood Control Act of 1970 (42
10       U.S.C. 1962d–5b(b)).
11       (b) AUTHORIZATION OF PILOT PROGRAM.—The Sec-
12 retary is authorized to carry out a pilot program for mod-
13 ernization activities on the inland waterways system.
14       (c) IMPLEMENTATION.—
15            (1) IN GENERAL.—In carrying out the pilot pro-
16       gram under this section, the Secretary may—
17                  (A) accept and expend funds provided by a
18            non-Federal interest to carry out, for an author-
19            ized project (or a separable element of an author-
20            ized project), modernization activities for such
21            project; or
22                  (B) coordinate with the non-Federal interest
23            in order to allow the non-Federal interest to
24            carry out, for an authorized project (or a sepa-




      •S 1811 EAH
                              125
 1           rable element of an authorized project), such
 2           modernization activities.
 3           (2) NUMBER.—The Secretary shall select not
 4      more than 2 authorized projects to participate in the
 5      pilot program under paragraph (1).
 6           (3) CONDITIONS.—Before carrying out mod-
 7      ernization activities pursuant to paragraph (1)(B), a
 8      non-Federal interest shall—
 9                 (A) obtain any permit or approval required
10           in connection with such activities under Federal
11           or State law that would be required if the Sec-
12           retary were to carry out such activities; and
13                 (B) ensure that a final environmental im-
14           pact statement or environmental assessment, as
15           appropriate, for such activities has been filed
16           pursuant to the National Environmental Policy
17           Act of 1969.
18           (4) MONITORING.—For any modernization ac-
19      tivities carried out by the non-Federal interest pursu-
20      ant to this section, the Secretary shall regularly mon-
21      itor and audit such activities to ensure that—
22                 (A) the modernization activities are carried
23           out in accordance with this section; and
24                 (B) the cost of the modernization activities
25           is reasonable.


     •S 1811 EAH
                             126
1            (5) REQUIREMENTS.—The requirements of sec-
2       tion 3142 of title 40, United States Code shall apply
3       to any modernization activities undertaken under or
4       pursuant to this section, either by the Secretary or the
5       non-Federal interest.
 6      (d) AGREEMENTS.—
 7           (1) ACTIVITIES CARRIED OUT BY NON-FEDERAL
 8      INTEREST.—

 9                 (A) IN GENERAL.—
10                     (i) WRITTEN     AGREEMENT.—Before      a
11                 non-Federal interest initiates modernization
12                 activities for an authorized project pursuant
13                 to this subsection (c)(1)(B), the non-Federal
14                 interest shall enter into a written agreement
15                 with the Secretary, under section 221 of the
16                 Flood Control Act of 1970 (42 U.S.C.
17                 1962d–5b), that requires the modernization
18                 activities to be carried out in accordance
19                 with—
20                          (I) a plan approved by the Sec-
21                     retary; and
22                          (II) any other terms and condi-
23                     tions specified by the Secretary in the
24                     agreement.




     •S 1811 EAH
                             127
 1                     (ii) REQUIREMENTS.—A written agree-
 2                 ment under clause (i) shall provide that the
 3                 non-Federal interest shall comply with the
 4                 same legal and technical requirements that
 5                 would apply if the modernization activities
 6                 were carried out by the Secretary, including
 7                 all mitigation required to offset environ-
 8                 mental impacts of the activities, as deter-
 9                 mined by the Secretary.
10                 (B) ALIGNMENT         WITH   ONGOING   ACTIVI-

11           TIES.—A written agreement under subparagraph

12           (A) shall include provisions that, to the max-
13           imum extent practicable, align modernization
14           activities under this section with ongoing oper-
15           ations and maintenance activities for the appli-
16           cable authorized project.
17                 (C) INDEMNIFICATION.—As part of a writ-
18           ten agreement under subparagraph (A), the non-
19           Federal interest shall agree to hold and save the
20           United States free from liability for any and all
21           damage that arises from the modernization ac-
22           tivities carried out by the non-Federal interest
23           pursuant to this section.
24           (2) ACTIVITIES CARRIED OUT BY SECRETARY.—
25      For modernization activities to be carried out by the


     •S 1811 EAH
                             128
 1      Secretary pursuant to subsection (c)(1)(A), the non-
 2      Federal interest shall enter into a written agreement
 3      with the Secretary, containing such terms and condi-
 4      tions as the Secretary determines appropriate.
 5      (e) REIMBURSEMENT.—
 6           (1) AUTHORIZATION.—Subject to the availability
 7      of appropriations, the Secretary may reimburse a
 8      non-Federal interest for the costs of modernization ac-
 9      tivities carried out by the non-Federal interest pursu-
10      ant to an agreement entered into under subsection
11      (d), or for funds provided to the Secretary under sub-
12      section (c)(1)(A), if—
13                 (A) the non-Federal interest complies with
14           the agreement entered into under subsection (d);
15           and
16                 (B) with respect to modernization activities
17           carried out by the non-Federal interest pursuant
18           to the agreement, the Secretary determines that
19           the non-Federal interest complied with all appli-
20           cable Federal requirements in carrying out the
21           modernization activities.
22           (2) LIMITATION.—The Secretary may only reim-
23      burse a non-Federal interest under paragraph (1) for
24      costs of construction that would otherwise be paid
25      from amounts appropriated from the general fund of


     •S 1811 EAH
                              129
 1       the Treasury pursuant to section 102 of the Water Re-
 2       sources Development Act of 1986 (33 U.S.C. 2212).
 3       (f) RULE OF CONSTRUCTION.—Nothing in this sec-
 4 tion—
 5            (1) affects the responsibility of the Secretary for
 6       the operations and maintenance of the inland water-
 7       way system, as of the day before the date of enactment
 8       of this Act, including the responsibility of the Sec-
 9       retary for the operations and maintenance costs for
10       any covered project after the modernization activities
11       are completed pursuant to this section;
12            (2) prohibits or prevents the use of Federal funds
13       for operations and maintenance of the inland water-
14       way system or any authorized project within the in-
15       land waterway system; or
16            (3) prohibits or prevents the use of Federal funds
17       for construction or major rehabilitation activities
18       within the inland waterway system or for any au-
19       thorized project within the inland waterway system.
20       (g) NOTIFICATION.—If a non-Federal interest notifies
21 the Secretary that the non-Federal interest intends to carry
22 out modernization activities for an authorized project, or
23 separable element thereof, pursuant to this section, the Sec-
24 retary shall provide written notice to the Committee on En-
25 vironment and Public Works of the Senate and the Com-


      •S 1811 EAH
                              130
 1 mittee on Transportation and Infrastructure of the House
 2 of Representatives concerning the intent of the non-Federal
 3 interest.
 4       (h) SUNSET.—
 5             (1) IN GENERAL.—The authority of the Secretary
 6       to enter into an agreement under this section shall
 7       terminate on the date that is 5 years after the date
 8       of enactment of this Act.
 9             (2) REIMBURSEMENT ELIGIBILITY.—The termi-
10       nation of authority under paragraph (1) shall not ex-
11       tinguish the eligibility of a non-Federal interest to
12       seek reimbursement under subsection (e).
13   SEC. 160. DEFINITION OF ECONOMICALLY DISADVANTAGED

14                  COMMUNITY.

15       (a) IN GENERAL.—Not later than 180 days after the
16 date of enactment of this Act, the Secretary shall issue guid-
17 ance defining the term ‘‘economically disadvantaged com-
18 munity’’ for the purposes of this Act and the amendments
19 made by this Act.
20       (b) CONSIDERATIONS.—In defining the term ‘‘economi-
21 cally disadvantaged community’’ under subsection (a), the
22 Secretary shall, to the maximum extent practicable, utilize
23 the criteria under paragraph (1) or (2) of section 301(a)
24 of the Public Works and Economic Development Act of 1965
25 (42 U.S.C. 3161), to the extent that such criteria are appli-


      •S 1811 EAH
                                131
 1 cable in relation to the development of water resources devel-
 2 opment projects.
 3       (c) PUBLIC COMMENT.—In developing the guidance
 4 under subsection (a), the Secretary shall provide notice and
 5 an opportunity for public comment.
 6   SEC. 161. STUDIES OF WATER RESOURCES DEVELOPMENT

 7                  PROJECTS BY NON-FEDERAL INTERESTS.

 8       (a) IN GENERAL.—Section 203 of the Water Resources
 9 Development Act of 1986 (33 U.S.C. 2231) is amended—
10            (1) in subsection (a)—
11                   (A) in paragraph (1), by inserting ‘‘, or,
12            upon the written approval of the Secretary that
13            the modifications are consistent with the author-
14            ized purposes of the project, undertake a feasi-
15            bility study on modifications to a water re-
16            sources development project constructed by the
17            Corps of Engineers,’’ after ‘‘water resources de-
18            velopment project’’; and
19                   (B) in paragraph (2), by striking ‘‘for feasi-
20            bility studies’’ and all that follows through the
21            period at the end and inserting ‘‘for the formula-
22            tion of feasibility studies of water resources de-
23            velopment projects undertaken by non-Federal
24            interests to—




      •S 1811 EAH
                              132
1                  ‘‘(A) ensure that any feasibility study with
2            respect to which the Secretary submits an assess-
3            ment to Congress under subsection (c) complies
4            with all of the requirements that would apply to
5            a feasibility study undertaken by the Secretary;
6            and
7                  ‘‘(B) provide sufficient information for the
8            formulation of the studies, including processes
9            and procedures related to reviews and assistance
10           under subsection (e).’’;
11           (2) in subsection (b)—
12                 (A) by striking ‘‘The Secretary’’ and insert-
13           ing the following:
14           ‘‘(1) IN GENERAL.—The Secretary’’; and
15                 (B) by adding at the end the following:
16           ‘‘(2) TIMING.—The Secretary may not submit to
17      Congress an assessment of a feasibility study under
18      this section until such time as the Secretary—
19                 ‘‘(A) determines that the feasibility study
20           complies with all of the requirements that would
21           apply to a feasibility study undertaken by the
22           Secretary; and
23                 ‘‘(B) completes all of the Federal analyses,
24           reviews, and compliance processes under the Na-
25           tional Environmental Policy Act of 1969 (42


     •S 1811 EAH
                              133
 1           U.S.C. 4321 et seq.), that would be required with
 2           respect to the proposed project if the Secretary
 3           had undertaken the feasibility study.
 4           ‘‘(3) INITIATION OF REVIEW.—
 5                 ‘‘(A) REQUEST.—
 6                      ‘‘(i) SUBMISSION.—The non-Federal
 7                 interest may submit to the Secretary a re-
 8                 quest that the Secretary initiate the anal-
 9                 yses, reviews, and compliance processes de-
10                 scribed in paragraph (2)(B) with respect to
11                 the proposed project prior to the non-Fed-
12                 eral interest’s submission of a feasibility
13                 study under subsection (a)(1).
14                      ‘‘(ii) EFFECT.—Receipt by the Sec-
15                 retary of a request submitted under clause
16                 (i) shall be considered the receipt of a pro-
17                 posal or application that will lead to a
18                 major Federal action that is subject to the
19                 requirements of section 102(2)(C) of the Na-
20                 tional Environmental Policy Act of 1969
21                 (42 U.S.C. 4332(2)(C)) that would be re-
22                 quired if the Secretary were to undertake
23                 the feasibility study.
24                 ‘‘(B) DEADLINE.—Not later than 10 days
25           after the Secretary receives a request under this


     •S 1811 EAH
                              134
 1            paragraph, the Secretary shall begin the required
 2            analyses, reviews, and compliance processes.
 3            ‘‘(4) NOTIFICATION.—Upon receipt of a request
 4      under paragraph (3), the Secretary shall notify the
 5      Committee on Transportation and Infrastructure of
 6      the House of Representatives and the Committee on
 7      Environment and Public Works of the Senate of the
 8      request and a timeline for completion of the required
 9      analyses, reviews, and compliance processes.
10            ‘‘(5) STATUS UPDATES.—Not later than 30 days
11      after receiving a request under paragraph (3), and
12      every 30 days thereafter until the Secretary submits
13      an assessment under subsection (c) for the applicable
14      feasibility study, the Secretary shall notify the Com-
15      mittee on Transportation and Infrastructure of the
16      House of Representatives, the Committee on Environ-
17      ment and Public Works of the Senate, and the non-
18      Federal interest of the status of the Secretary’s re-
19      quired analyses, reviews, and compliance processes.’’;
20      and
21            (3) in subsection (c)(1), in the matter preceding
22      subparagraph (A)—
23                 (A) by striking ‘‘after the date of receipt of
24            a feasibility study of a project under subsection
25            (a)(1)’’ and insert ‘‘after the completion of re-


     •S 1811 EAH
                               135
 1            view of a feasibility study under subsection (b)’’;
 2            and
 3                   (B) by striking ‘‘a report’’ and inserting
 4            ‘‘an assessment’’.
 5       (b) DEADLINE.—Not later than 90 days after the date
 6 of enactment of this Act, the Secretary shall issue revised
 7 guidelines under section 203 of the Water Resources Devel-
 8 opment Act of 1986 (33 U.S.C. 2231) to implement the
 9 amendments made by this section.
10       (c) HOLD HARMLESS.—
11            (1) ONE-YEAR WINDOW.—The amendments made
12       by this section shall not apply to any feasibility study
13       submitted to the Secretary under section 203 of the
14       Water Resources Development Act of 1986 (33 U.S.C.
15       2231) during the one-year period prior to the date of
16       enactment of this section.
17            (2) 2020 PROJECTS.—The amendments made by
18       this section shall not apply to any project authorized
19       by section 403 of this Act.
20   SEC. 162. LEVERAGING FEDERAL INFRASTRUCTURE FOR IN-

21                  CREASED WATER SUPPLY.

22       Section 1118(i) of the Water Resources Development
23 Act of 2016 (43 U.S.C. 390b-2(i)) is amended—
24            (1) by striking ‘‘The Secretary may’’ and insert-
25       ing the following:


      •S 1811 EAH
                                136
 1            ‘‘(1)    CONTRIBUTED       FUNDS      FOR     CORPS

 2       PROJECTS.—The Secretary may’’; and

 3            (2) by adding at the end the following:
 4            ‘‘(2) CONTRIBUTED FUNDS FOR OTHER FEDERAL
 5       RESERVOIR PROJECTS.—The Secretary is authorized

 6       to receive and expend funds from a non-Federal inter-
 7       est to formulate, review, or revise operational docu-
 8       ments, pursuant to a proposal submitted in accord-
 9       ance subsection (a), for any reservoir for which the
10       Secretary is authorized to prescribe regulations for
11       the use of storage allocated for flood control or naviga-
12       tion pursuant to section 7 of the Act of December 22,
13       1944 (33 U.S.C. 709).’’.
14   SEC. 163. SENSE OF CONGRESS ON REMOVAL OF UNAU-

15                  THORIZED,   MANMADE,     FLAMMABLE      MATE-

16                  RIALS ON CORPS PROPERTY.

17       It is the sense of Congress that the Secretary should,
18 using existing authorities, prioritize the removal, from fa-
19 cilities and lands of the Corps of Engineers in regions that
20 are urban and arid, of materials that are manmade, flam-
21 mable, unauthorized to be present, and determined by the
22 Secretary to pose a fire risk that is a threat to public safety.
23   SEC. 164. ENHANCED DEVELOPMENT PROGRAM.

24       (a) IN GENERAL.—The Secretary shall review the mas-
25 ter plan and shoreline management plan for any lake de-


      •S 1811 EAH
                              137
 1 scribed in section 3134 of the Water Resources Development
 2 Act of 2007 (121 Stat. 1142; 130 Stat. 1671) for the purpose
 3 of identifying structures or other improvements that are
 4 owned by the Secretary and are suitable for enhanced devel-
 5 opment, if—
 6            (1) the master plan and shoreline management
 7       plan of the lake have been updated since January 1,
 8       2013; and
 9            (2) the applicable district office of the Corps of
10       Engineers has received a written request for such a
11       review from any entity.
12       (b) DEFINITION OF ENHANCED DEVELOPMENT.—In
13 this section, the term ‘‘enhanced development’’ means the
14 use, for non-water-dependent commercial or hospitality in-
15 dustry purposes or for residential or recreational purposes,
16 of an existing structure or other improvement.
17       (c) DIVESTMENT AUTHORITY.—Not later than 1 year
18 after the date of enactment of this Act, the Secretary shall—
19            (1) submit to the Committee on Environment
20       and Public Works of the Senate and the Committee on
21       Transportation and Infrastructure of the House of
22       Representatives a report that identifies—
23                  (A) any structure or other improvement
24            owned by the Secretary that—




      •S 1811 EAH
                                  138
 1                        (i) has been identified as suitable for
 2                   enhanced development pursuant to sub-
 3                   section (a);
 4                        (ii) the Secretary determines the di-
 5                   vestment of which would not adversely affect
 6                   the Corps of Engineers operation of the lake
 7                   at which the structure or other improvement
 8                   is located; and
 9                        (iii) a non-Federal interest has offered
10                   to purchase from the Secretary; and
11                   (B) the fair market value of any structure
12               or other improvement identified under subpara-
13               graph (A); and
14               (2) develop a plan to divest any structure or
15       other      improvement     identified   under   paragraph
16       (1)(A), at fair market value, to the applicable non-
17       Federal interest.
18   SEC. 165. CONTINUING AUTHORITY PROGRAMS.

19       (a) PILOT PROGRAM FOR CONTINUING AUTHORITY
20 PROJECTS IN SMALL OR DISADVANTAGED COMMUNITIES.—
21               (1) IN GENERAL.—Not later than 180 days after
22       the date of enactment of this Act, the Secretary shall
23       implement a pilot program, in accordance with this
24       subsection, for carrying out a project under a con-




      •S 1811 EAH
                             139
 1      tinuing authority program for an economically dis-
 2      advantaged community.
 3           (2) PARTICIPATION IN PILOT PROGRAM.—In car-
 4      rying out paragraph (1), the Secretary shall—
 5                 (A) publish a notice in the Federal Register
 6           that requests non-Federal interest proposals for a
 7           project under a continuing authority program
 8           for an economically disadvantaged community;
 9           and
10                 (B) review such proposals and select a total
11           of 10 projects, taking into consideration geo-
12           graphic diversity among the selected projects.
13           (3) COST     SHARE.—Notwithstanding        the cost
14      share authorized for the applicable continuing author-
15      ity program, the Federal share of the cost of a project
16      selected under paragraph (2) shall be 100 percent.
17           (4) SUNSET.—The authority to commence pursu-
18      ant to this subsection a project selected under para-
19      graph (2) shall terminate on the date that is 10 years
20      after the date of enactment of this Act.
21           (5)   CONTINUING      AUTHORITY       PROGRAM    DE-

22      FINED.—In this subsection, the term ‘‘continuing au-

23      thority program’’ has the meaning given that term in
24      section 7001(c)(1)(D) of Water Resources Reform and
25      Development Act of 2014 (33 U.S.C. 2282d).


     •S 1811 EAH
                            140
 1      (b) AUTHORIZATIONS OF APPROPRIATIONS.—
 2           (1) EMERGENCY STREAMBANK AND SHORELINE
 3      PROTECTION.—Notwithstanding      section 14 of the
 4      Flood Control Act of 1946 (33 U.S.C. 701r), there is
 5      authorized to be appropriated to carry out such sec-
 6      tion $25,500,000 for each of fiscal years 2021 through
 7      2024.
 8           (2) STORM AND HURRICANE RESTORATION AND
 9      IMPACT     MINIMIZATION   PROGRAM.—Notwithstanding

10      section 3(c) of the Act of August 13, 1946 (33 U.S.C.
11      426g(c)), there is authorized to be appropriated to
12      carry out such section $38,000,000 for each of fiscal
13      years 2021 through 2024.
14           (3) SMALL RIVER AND HARBOR IMPROVEMENT
15      PROJECTS.—Notwithstanding      section 107(a) of the
16      River and Harbor Act of 1960 (33 U.S.C. 577(a)),
17      there is authorized to be appropriated to carry out
18      such section $63,000,000 for each of fiscal years 2021
19      through 2024.
20           (4) REGIONAL    SEDIMENT MANAGEMENT.—Not-

21      withstanding section 204(g) of the Water Resources
22      Development Act of 1992 (33 U.S.C. 2326(g)), there
23      is authorized to be appropriated to carry out such
24      section $63,000,000 for each of fiscal years 2021
25      through 2024.


     •S 1811 EAH
                            141
1            (5) SMALL    FLOOD CONTROL PROJECTS.—Not-

2       withstanding section 205 of the Flood Control Act of
3       1948 (33 U.S.C. 701s), there is authorized to be ap-
4       propriated to carry out such section $69,250,000 for
5       each of fiscal years 2021 through 2024.
 6           (6) AQUATIC    ECOSYSTEM RESTORATION.—Not-

 7      withstanding section 206(f) of the Water Resources
 8      Development Act of 1996 (33 U.S.C. 2330(f)), there is
 9      authorized to be appropriated to carry out such sec-
10      tion $63,000,000 for each of fiscal years 2021 through
11      2024.
12           (7) REMOVAL      OF   OBSTRUCTIONS;    CLEARING

13      CHANNELS.—Notwithstanding section 2 of the Act of

14      August 28, 1937 (33 U.S.C. 701g), there is authorized
15      to be appropriated to carry out such section
16      $8,000,000 for each of fiscal years 2021 through 2024.
17           (8) PROJECT MODIFICATIONS FOR IMPROVEMENT
18      OF ENVIRONMENT.—Notwithstanding section 1135(h)

19      of the Water Resources Development Act of 1986 (33
20      U.S.C. 2309a(h)), there is authorized to be appro-
21      priated to carry out such section $50,500,000 for each
22      of fiscal years 2021 through 2024.




     •S 1811 EAH
                                142
 1           TITLE II—STUDIES AND
 2                  REPORTS
 3   SEC. 201. AUTHORIZATION OF PROPOSED FEASIBILITY

 4                  STUDIES.

 5       (a) IN GENERAL.—The Secretary is authorized to con-
 6 duct a feasibility study for the following projects for water
 7 resources development and conservation and other purposes,
 8 as identified in the reports titled ‘‘Report to Congress on
 9 Future Water Resources Development’’ submitted to Con-
10 gress pursuant to section 7001 of the Water Resources Re-
11 form and Development Act of 2014 (33 U.S.C. 2282d) or
12 otherwise reviewed by Congress:
13            (1) SULPHUR RIVER, ARKANSAS AND TEXAS.—
14       Project for ecosystem restoration, Sulphur River, Ar-
15       kansas and Texas.
16            (2) CABLE        CREEK,   CALIFORNIA.—Project   for
17       flood risk management, water supply, and related
18       benefits, Cable Creek, California.
19            (3) OROVILLE       DAM, CALIFORNIA.—Project     for
20       dam safety improvements, Oroville Dam, California.
21            (4) RIO HONDO CHANNEL, CALIFORNIA.—Project
22       for ecosystem restoration, Rio Hondo Channel, San
23       Gabriel River, California.
24            (5) SHINGLE       CREEK AND KISSIMMEE RIVER,

25       FLORIDA.—Project       for ecosystem restoration and


      •S 1811 EAH
                               143
 1      water storage, Shingle Creek and Kissimmee River,
 2      Osceola County, Florida.
 3           (6) ST. JOHN’S RIVER AND LAKE JESUP, FLOR-
 4      IDA.—Project      for ecosystem restoration, St. John’s
 5      River and Lake Jesup, Florida.
 6           (7) CHICAGO AREA WATERWAYS SYSTEM, ILLI-
 7      NOIS.—Project     for ecosystem restoration, recreation,
 8      and other purposes, Illinois River, Chicago River,
 9      Calumet River, Grand Calumet River, Little Calumet
10      River, and other waterways in the vicinity of Chi-
11      cago, Illinois.
12           (8) FOX RIVER, ILLINOIS.—Project for flood risk
13      management, Fox River, Illinois.
14           (9) LOWER MISSOURI RIVER, KANSAS.—Project
15      for bank stabilization and navigation, Lower Mis-
16      souri River, Sioux City, Kansas.
17           (10) TANGIPAHOA PARISH, LOUISIANA.—Project
18      for flood risk management, Tangipahoa Parish, Lou-
19      isiana.
20           (11) NEWBURY AND NEWBURYPORT, MASSACHU-
21      SETTS.—Project for coastal storm risk management,

22      Newbury and Newburyport, Massachusetts.
23           (12) ESCATAWPA RIVER BASIN, MISSISSIPPI.—
24      Project for flood risk management and ecosystem res-




     •S 1811 EAH
                              144
 1      toration, Escatawpa River, Jackson County, Mis-
 2      sissippi.
 3           (13) LONG BEACH, BAY ST. LOUIS AND MIS-
 4      SISSIPPI SOUND, MISSISSIPPI.—Project for hurricane

 5      and storm damage risk reduction and flood risk man-
 6      agement, Long Beach, Bay St. Louis and Mississippi
 7      Sound, Mississippi.
 8           (14) TALLAHOMA AND TALLAHALA CREEKS, MIS-
 9      SISSIPPI.—Project     for flood risk management, Leaf
10      River, Jones County, Mississippi.
11           (15) LOWER        MISSOURI   RIVER,   MISSOURI.—

12      Project for navigation, Lower Missouri River, Mis-
13      souri.
14           (16) LOWER OSAGE RIVER BASIN, MISSOURI.—
15      Project for ecosystem restoration, Lower Osage River
16      Basin, Missouri.
17           (17) WYATT, MISSOURI.—Project for flood risk
18      management, P. Fields Pump Station, Wyatt, Mis-
19      souri.
20           (18) UPPER BASIN AND STONY BROOK (GREEN
21      BROOK SUB-BASIN), RARITAN RIVER BASIN, NEW JER-

22      SEY.—Reevaluation      of the Upper Basin and Stony
23      Brook portions of the project for flood control, Green
24      Brook Sub-basin, Raritan River Basin, New Jersey,
25      authorized by section 401 of the Water Resources De-


     •S 1811 EAH
                            145
 1      velopment Act of 1986 (100 Stat. 4119), including the
 2      evaluation of nonstructural measures to achieve the
 3      project purpose.
 4           (19) WADING RIVER CREEK, NEW YORK.—Project
 5      for hurricane and storm damage risk reduction, flood
 6      risk management, navigation, and ecosystem restora-
 7      tion, Wading River Creek, New York.
 8           (20) LOWER COLUMBIA RIVER BASIN (TURNING
 9      BASIN), OREGON AND WASHINGTON.—Project         to im-
10      prove and add turning basins for the project for navi-
11      gation, Columbia River Channel, Oregon and Wash-
12      ington, authorized by section 101(b)(13) of the Water
13      Resources Development Act of 1999 (113 Stat. 280).
14           (21)   WILLIAMSPORT,     PENNSYLVANIA.—Project

15      for flood risk management and levee rehabilitation,
16      greater Williamsport, Pennsylvania.
17           (22) CITY OF CHARLESTON, SOUTH CAROLINA.—
18      Project for tidal- and inland-related flood risk man-
19      agement, Charleston, South Carolina.
20           (23) CHOCOLATE       BAYOU, TEXAS.—Project    for
21      flood risk management, Chocolate Bayou, Texas.
22           (24) HOUSTON-GALVESTON, TEXAS.—Project for
23      navigation, Houston-Galveston, Texas.
24           (25) PORT     ARTHUR     AND   ORANGE   COUNTY,

25      TEXAS.—Project for flood risk management, Port Ar-



     •S 1811 EAH
                               146
 1       thur and Orange County, Texas, including construc-
 2       tion of improvements to interior drainage.
 3              (26) PORT   OF VICTORIA, TEXAS.—Project     for
 4       flood risk management, Port of Victoria, Texas.
 5              (27) VIRGINIA BEACH AND VICINITY, VIRGINIA
 6       AND NORTH CAROLINA.—Project for coastal storm risk

 7       management, Virginia Beach and vicinity, Virginia
 8       and North Carolina.
 9       (b) SPECIAL RULE.—The Secretary shall consider any
10 study carried out by the Secretary to formulate the project
11 for flood risk management, Port Arthur and Orange Coun-
12 ty, Texas, identified in subsection (a)(25) to be a continu-
13 ation of the study carried out for Sabine Pass to Galveston
14 Bay, Texas, authorized by a resolution of the Committee
15 on Environment and Public Works of the Senate, approved
16 June 23, 2004, and funded by title IV of division B of the
17 Bipartisan Budget Act of 2018, under the heading ‘‘CORPS
18 OF ENGINEERS—CIVIL—DEPARTMENT OF THE
19 ARMY—CONSTRUCTION’’ (Public Law 115–123; 132
20 Stat. 76).
21   SEC. 202. EXPEDITED COMPLETIONS.

22       (a) FEASIBILITY REPORTS.—The Secretary shall expe-
23 dite the completion of a feasibility study for each of the
24 following projects, and if the Secretary determines that the
25 project is justified in a completed report, may proceed di-


      •S 1811 EAH
                             147
1 rectly to preconstruction planning, engineering, and design
2 of the project:
3            (1) Project for navigation, Florence, Alabama.
4            (2) Project to modify the project for navigation,
5       Tennessee-Tombigbee Waterway, Alabama, Kentucky,
6       Mississippi, and Tennessee.
7            (3) Project for shoreline stabilization, Aunu‘u
8       Harbor, American Samoa.
9            (4) Project for shoreline stabilization, Tutuila Is-
10      land, American Samoa.
11           (5) Project for flood risk management, Lower
12      Santa Cruz River, Arizona.
13           (6) Project for flood risk management, Rio de
14      Flag, Arizona.
15           (7) Project for flood risk management, Tonto
16      Creek, Gila River, Arizona.
17           (8) Project for flood control, water conservation,
18      and related purposes, Coyote Valley Dam, California.
19           (9) Project for shoreline stabilization, Del Mar
20      Bluffs, San Diego County, California, carried out
21      pursuant to the resolution of the Committee on Trans-
22      portation and Infrastructure of the House of Rep-
23      resentatives adopted on April 22, 1999 (docket num-
24      ber 2598).




     •S 1811 EAH
                            148
1            (10) Project for flood damage reduction and eco-
2       system restoration, Del Rosa Channel, city of San
3       Bernardino, California.
4            (11) Project for flood risk management, Lower
5       Cache Creek, California.
6            (12) Project for flood damage reduction and eco-
7       system restoration, Mission-Zanja Channel, cities of
8       San Bernardino and Redlands, California.
9            (13) Project for flood risk management, Napa,
10      California.
11           (14) Project for shoreline protection, Oceanside,
12      California, authorized pursuant to section 414 of the
13      Water Resources Development Act of 2000 (114 Stat.
14      2636; 121 Stat. 1176).
15           (15) Project for ecosystem restoration and water
16      conservation, Prado Basin, Orange, Riverside, and
17      San Bernardino counties, California.
18           (16) Project for water conservation and water
19      supply, Redbank and Fancher Creeks, California.
20           (17) Project for coastal storm damage reduction,
21      San Diego County shoreline, California.
22           (18) Project to modify the project for navigation,
23      San Francisco Bay to Stockton, California.
24           (19) Project for flood risk management, San
25      Francisquito Creek, California.


     •S 1811 EAH
                               149
1            (20) Project to modify the Seven Oaks Dam,
2       California, portion of the project for flood control,
3       Santa Ana River Mainstem, California, authorized
4       by section 401(a) of the Water Resources Development
5       Act of 1986 (100 Stat. 4113; 101 Stat. 1329–111; 104
6       Stat. 4611; 110 Stat. 3713; 121 Stat. 1115), to in-
7       clude water conservation as an authorized purpose.
8            (21) Project for coastal storm damage reduction,
9       Southern California.
10           (22) Project for water storage, Halligan Dam,
11      Colorado.
12           (23) Project for flood risk management, East
13      Hartford Levee System, Connecticut.
14           (24) Project for flood risk management, Fairfield
15      and New Haven Counties, Connecticut.
16           (25) Project for navigation, Guilford Harbor and
17      Sluice Channel, Connecticut.
18           (26) Project for flood risk management, Hartford
19      Levee System, Connecticut.
20           (27) Project for ecosystem restoration, Central
21      and Southern Florida Project Canal 111 (C–111),
22      South Dade County, Florida.
23           (28) Project for ecosystem restoration, Lake
24      Okeechobee, Florida.




     •S 1811 EAH
                               150
1            (29) Project for ecosystem restoration, Western
2       Everglades, Florida.
3            (30)   Project    for   flood   risk   management,
4       Hanapepe River, Kauai, Hawaii.
5            (31) Project for flood risk management, Wailupe
6       Stream, Oahu, Hawaii.
7            (32) Project for flood risk management, Waimea
8       River, Kauai, Hawaii, being carried out under sec-
9       tion 205 of the Flood Control Act of 1948 (33 U.S.C.
10      701s).
11           (33) Project for comprehensive hurricane and
12      storm damage risk reduction and shoreline erosion
13      protection, Chicago, Illinois, authorized by section
14      101(a)(12) of the Water Resources Development Act of
15      1996 (110 Stat. 3664; 113 Stat. 302).
16           (34) Project for flood risk management, Wheaton,
17      DuPage County, Illinois.
18           (35) Project for flood damage reduction, eco-
19      system restoration, and recreation, Blue River Basin,
20      Kansas City, Kansas, carried out pursuant to the res-
21      olution of the Committee on Transportation and In-
22      frastructure of the House of Representatives adopted
23      on September 24, 2008 (docket number 2803).
24           (36) Project for flood control, Amite River and
25      Tributaries east of the Mississippi River, Louisiana.


     •S 1811 EAH
                            151
1            (37) Project for coastal storm risk management,
2       Upper Barataria Basin, Louisiana.
3            (38) Project for navigation, Kent Narrows and
4       Chester River, Queen Anne’s County, Maryland.
5            (39) Project to replace the Bourne and Sagamore
6       Bridges, Cape Cod, Massachusetts.
7            (40) Project for flood risk management, eco-
8       system restoration, and recreation, Lower St. Croix
9       River, Minnesota, carried out pursuant to the resolu-
10      tion of the Committee on Transportation and Infra-
11      structure of the House of Representatives adopted on
12      September 25, 2002 (docket number 2705).
13           (41) Project to deepen the project for navigation,
14      Gulfport Harbor, Mississippi, authorized by section
15      202(a) of the Water Resources Development Act of
16      1986 (100 Stat. 4094).
17           (42) Project for navigation, Shark River, New
18      Jersey.
19           (43) Project for navigation, Goldsmith Inlet,
20      New York.
21           (44) Project for navigation, Lake Montauk Har-
22      bor, New York.
23           (45) Project for rehabilitation of Lock E–32,
24      Erie Canal, Pittsford, New York.




     •S 1811 EAH
                            152
1            (46) Project for navigation and shoreline sta-
2       bilization, Reel Point Preserve, New York, carried out
3       pursuant to the resolution of the Committee on Trans-
4       portation and Infrastructure of the House of Rep-
5       resentatives adopted on May 2, 2007 (docket number
6       2775).
7            (47) Project for flood risk management, Rondout
8       Creek-Wallkill River Watershed, New York, carried
9       out pursuant to the resolution of the Committee on
10      Transportation and Infrastructure of the House of
11      Representatives adopted on May 2, 2007 (docket num-
12      ber 2776).
13           (48) Project for ecosystem restoration and hurri-
14      cane and storm damage risk reduction, Spring Creek
15      South (Howard Beach), Queens, New York.
16           (49) Project for ecosystem restoration, Hood
17      River at the confluence with the Columbia River, Or-
18      egon.
19           (50) Project to resolve increased silting and
20      shoaling adjacent to the Federal channel, Port of
21      Bandon, Coquille River, Oregon.
22           (51) Project for flood control, 42nd Street Levee,
23      Springfield, Oregon, being carried out under section
24      205 of the Flood Control Act of 1948 (33 U.S.C.
25      701s).


     •S 1811 EAH
                            153
1            (52) Project for construction of Tribal housing
2       authorized by title IV of Public Law 100–581 (102
3       Stat. 2944), Oregon and Washington.
4            (53) Project for flood risk management, Dor-
5       chester County, South Carolina.
6            (54) Project for navigation, Georgetown Harbor,
7       South Carolina.
8            (55) Project for hurricane and storm damage
9       risk reduction, Myrtle Beach, South Carolina.
10           (56) Project to modify the projects for navigation
11      and other purposes, Old Hickory Lock and Dam and
12      the Cordell Hull Dam and Reservoir, Cumberland
13      River, Tennessee, authorized by the Act of July 24,
14      1946 (chapter 595, 60 Stat. 636), to add flood risk
15      management as an authorized purpose.
16           (57) Project for flood risk management, Buffalo
17      Bayou, Texas.
18           (58) Project for flood risk management, eco-
19      system restoration, water supply, and related pur-
20      poses, Lower Rio Grande River, Cameron County,
21      Texas, carried out pursuant to the resolution of the
22      Committee on Transportation and Infrastructure of
23      the House of Representatives adopted on May 21,
24      2003 (docket number 2710).




     •S 1811 EAH
                               154
 1            (59) Project for hurricane and storm damage
 2       risk reduction and shoreline erosion protection,
 3       Bolongo Bay, St. Thomas, United States Virgin Is-
 4       lands.
 5            (60) Project for water supply and ecosystem res-
 6       toration, Howard Hanson Dam, Washington.
 7            (61) Project for ecosystem restoration, Puget
 8       Sound, Washington.
 9            (62) Project for navigation, Seattle Harbor,
10       Washington.
11            (63) Project for navigation, Tacoma Harbor,
12       Washington.
13            (64)   Project   for   dam   safety   remediation,
14       Bluestone Dam, West Virginia.
15            (65) Project to modify the project for navigation,
16       Milwaukee Harbor, Wisconsin.
17       (b) POST-AUTHORIZATION CHANGE REPORTS.—The
18 Secretary shall expedite completion of a post-authorization
19 change report for the following projects:
20            (1) Project for ecosystem restoration, Tres Rios,
21       Arizona.
22            (2) Project for flood risk management, Des
23       Moines Levee System, including Birdland Park Levee,
24       Des Moines and Raccoon Rivers, Des Moines, Iowa.




      •S 1811 EAH
                               155
 1       (c) WATERSHED AND RIVER BASIN ASSESSMENTS.—
 2 The Secretary shall expedite the completion of an assess-
 3 ment under section 729 of the Water Resources Development
 4 Act of 1986 (33 U.S.C. 2267a) for the following:
 5              (1) Kansas River Basin, Kansas.
 6              (2) Merrimack River Basin, Massachusetts.
 7              (3) Pascagoula River Basin, Mississippi.
 8              (4) Tuscarawas River Basin, Ohio.
 9              (5) Lower Fox River Basin, Wisconsin.
10              (6) Upper Fox River Basin and Wolf River
11       Basin, Wisconsin.
12       (d) DISPOSITION STUDIES.—The Secretary shall expe-
13 dite the completion of a disposition study, carried out under
14 section 216 of the Flood Control Act of 1970 (33 U.S.C.
15 549a), for the project for Salinas Reservoir (Santa Mar-
16 garita Lake), California.
17       (e) REALLOCATION STUDIES.—The Secretary shall ex-
18 pedite the completion of a study for the reallocation of water
19 supply storage, carried out in accordance with section 301
20 of the Water Supply Act of 1958 (43 U.S.C. 390b), for the
21 following:
22              (1) Aquilla Lake, Texas.
23              (2) Lake Whitney, Texas.
24       (f) ECONOMIC REEVALUATION REPORT.—The Sec-
25 retary shall expedite the completion of the economic reevalu-


      •S 1811 EAH
                                 156
 1 ation report for the navigation and sustainability program
 2 carried out pursuant to title VIII of the Water Resources
 3 Development Act of 2007 (33 U.S.C. 652 note).
 4   SEC. 203. EXPEDITED MODIFICATIONS OF EXISTING FEASI-

 5                  BILITY STUDIES.

 6       (a) IN GENERAL.—The Secretary shall expedite the
 7 completion of the following feasibility studies, as modified
 8 by this section, and if the Secretary determines that a
 9 project that is the subject of the feasibility study is justified
10 in    a    completed    report,     may   proceed   directly   to
11 preconstruction planning, engineering, and design of the
12 project:
13             (1) SAN     FRANCISCO     BAY,   CALIFORNIA.—The

14       study for flood risk reduction authorized by section
15       142 of the Water Resources Development Act of 1976
16       (90 Stat. 2930), is modified to authorize the Secretary
17       to—
18                   (A) investigate the ocean shoreline of San
19             Mateo, San Francisco, and Marin Counties for
20             the purposes of providing flood protection
21             against tidal and fluvial flooding;
22                   (B) with respect to the bay and ocean shore-
23             lines of San Mateo, San Francisco, and Marin
24             Counties, investigate measures to adapt to rising
25             sea levels; and


      •S 1811 EAH
                                157
1                  (C) with respect to the bay and ocean shore-
2            lines, and streams running to the bay and ocean
3            shorelines, of San Mateo, San Francisco, and
4            Marin Counties, investigate the effects of pro-
5            posed flood protection and other measures or im-
6            provements on—
7                         (i) the local economy;
8                         (ii) habitat restoration, enhancement,
9                  or expansion efforts or opportunities;
10                        (iii) public infrastructure protection
11                 and improvement;
12                        (iv) stormwater runoff capacity and
13                 control measures, including those that may
14                 mitigate flooding;
15                        (v) erosion of beaches and coasts; and
16                        (vi) any other measures or improve-
17                 ments relevant to adapting to rising sea lev-
18                 els.
19           (2) SACRAMENTO           RIVER,   SOUTHERN   SUTTER

20      COUNTY, CALIFORNIA.—The           study for flood control
21      and allied purposes for the Sacramento River Basin,
22      authorized by section 209 of the Flood Control Act of
23      1962 (76 Stat. 1197), is modified to authorize the
24      Secretary to conduct a study for flood risk manage-




     •S 1811 EAH
                               158
 1      ment, southern Sutter County between the Sac-
 2      ramento River and Sutter Bypass, California.
 3           (3) SALTON SEA, CALIFORNIA.—In carrying out
 4      the program to implement projects to restore the
 5      Salton Sea, California, authorized by section 3032 of
 6      the Water Resources Development Act of 2007 (121
 7      Stat. 1113; 130 Stat. 1677), the Secretary is author-
 8      ized to carry out a study for the construction of a pe-
 9      rimeter lake, or a northern or southern subset thereof,
10      for the Salton Sea, California.
11           (4) NEW YORK AND NEW JERSEY HARBOR AND
12      TRIBUTARIES, NEW YORK AND NEW JERSEY.—The

13      study for flood and storm damage reduction for the
14      New York and New Jersey Harbor and Tributaries
15      project, authorized by the Act of June 15, 1955 (chap-
16      ter 140, 69 Stat. 132), and being carried out pursu-
17      ant to the Disaster Relief Appropriations Act, 2013
18      (Public Law 113–2), is modified to require the Sec-
19      retary to—
20                 (A) evaluate and address the impacts of
21           low-frequency precipitation and sea-level rise on
22           the study area;
23                 (B) consult with affected communities; and
24                 (C) ensure the study is carried out in ac-
25           cordance with section 1001 of the Water Re-


     •S 1811 EAH
                               159
 1            sources Reform and Development Act of 2014 (33
 2            U.S.C. 2282c).
3        (b) CONSIDERATIONS.—Where appropriate, the Sec-
4 retary may use the authority provided by section 216 of
5 the Flood Control Act of 1970 (33 U.S.C. 549a) to carry
6 out this section.
 7   SEC. 204. ASSISTANCE TO NON-FEDERAL SPONSORS; FEASI-

 8                  BILITY ANALYSIS.

 9       (a) ASSISTANCE TO NON-FEDERAL SPONSORS.—
10            (1) IN GENERAL.—Subject to the availability of
11       appropriations, during the period during which a
12       non-Federal interest may submit a proposal to be
13       considered for inclusion in an annual report pursu-
14       ant to section 7001(b) of the Water Resources Reform
15       and Development Act of 2014 (33 U.S.C. 2282d(b)),
16       the Secretary is authorized to provide assistance in
17       accordance with section 1104(b) of the Water Re-
18       sources Development Act of 2018 (33 U.S.C. 2282d
19       note) to the non-Federal interest of a project proposal
20       described in paragraph (2).
21            (2) PROJECT PROPOSALS DESCRIBED.—A project
22       proposal referred to in paragraph (1) is a proposal
23       for any of the following:




      •S 1811 EAH
                              160
1                  (A) A feasibility study for a fish passage for
2            ecosystem restoration, Lower Alabama River,
3            Alabama.
4                  (B) A feasibility study for dredged material
5            disposal management activities, Port of Florence,
6            Alabama.
7                  (C) A feasibility study for a project for
8            flood risk management, Sikorsky Memorial Air-
9            port, Bridgeport, Connecticut.
10                 (D) A feasibility study for a project to de-
11           sign and construct the Naugatuck River Green-
12           way Trail, a multiuse trail on Federal land be-
13           tween Torrington and Derby, Connecticut.
14                 (E) A feasibility study for a project for
15           coastal and flood risk management, Stratford,
16           Connecticut.
17                 (F) A feasibility study for projects for flood
18           risk management, Woodbridge, Connecticut.
19                 (G) The project for flood risk management,
20           Bloomington, Indiana.
21                 (H) The project for flood risk management,
22           Gary, Indiana.
23                 (I) Modification of the project for beach ero-
24           sion and hurricane protection, Grand Isle, Lou-
25           isiana, to include periodic beach nourishment.


     •S 1811 EAH
                                 161
1                     (J) A feasibility study for a project for flood
2            risk management, Cataouatche Subbasin area of
3            the west bank of Jefferson Parish, Louisiana.
4                     (K) A feasibility study for projects for flood
5            risk management and storm damage reduction
6            in the Hoey’s Basin area of the east bank of Jef-
7            ferson Parish, Louisiana, including a study of
8            the ‘‘pump to the river’’ concept.
9                     (L) A feasibility study for a project for
10           flood risk management, Hoosic River, Massachu-
11           setts.
12                    (M) Modification of the project for naviga-
13           tion, River Rouge, Michigan.
14                    (N) A project to extend dredging of the
15           South Haven Harbor, Michigan, to include the
16           former turning basin.
17                    (O) Modification of the project for flood risk
18           management, Upper Rouge River, Wayne Coun-
19           ty, Michigan.
20                    (P) A project for aquatic and riparian eco-
21           system restoration, Line Creek, Riverside, Mis-
22           souri.
23                    (Q) A feasibility study for projects for eco-
24           system restoration, Bangert Island, St. Charles,




     •S 1811 EAH
                                162
1            Missouri, related to channels and aquatic habi-
2            tats.
3                    (R) A study of the resiliency of the Alle-
4            gheny Reservoir, New York, in consultation with
5            the Seneca Nation.
6                    (S) A feasibility study for the rehabilitation
7            of the tainter gates and guard gate, Caughdenoy
8            Dam, New York, including an evaluation of the
9            rehabilitation work necessary to extend the serv-
10           ice life of those structures, such as—
11                        (i) improvements to the hydraulic effi-
12                   ciency of the gate systems;
13                        (ii) improvements to the concrete foun-
14                   dation and gate support structures; and
15                        (iii) any other improvements the Sec-
16                   retary determines to be necessary.
17                   (T) A project for repairs to the West Pier
18           and West Barrier Bar, Little Sodus Bay Harbor,
19           Cayuga County, New York.
20                   (U) A project for repair of a sheet pile wall
21           and east breakwater, Great Sodus Bay, New
22           York.
23                   (V) A feasibility study for the project for
24           navigation, Port of Oswego, New York.




     •S 1811 EAH
                              163
 1                 (W) A feasibility study for potential
 2           projects for the rehabilitation of the Glens Falls
 3           Feeder Canal, which begins at the Feeder Dam
 4           intersection    with     the     Hudson    River   in
 5           Queensbury, New York, and runs to the con-
 6           fluence   of   the     Old     Champlain   Canal   in
 7           Kingsbury, New York.
 8                 (X) A feasibility study to determine whether
 9           the purchase of additional flood easements,
10           changes in lake level management, additional
11           levee infrastructure, or implementation of other
12           flood risk management or containment mecha-
13           nisms in the Arkansas River Basin, Oklahoma,
14           would benefit local communities by reducing
15           flood risks around water resources development
16           projects of the Corps of Engineers in a range of
17           different flood scenarios.
18                 (Y) A feasibility study on increasing the
19           frequency and depth of dredging assistance from
20           the Corps of Engineers at the Port of Astoria, lo-
21           cated at the mouth of the Columbia River, Or-
22           egon.
23      (b) FEASIBILITY ANALYSIS.—
24           (1) IN GENERAL.—Subject to the availability of
25      appropriations, the Secretary is authorized to review


     •S 1811 EAH
                             164
 1      a project proposal described in paragraph (2) and
 2      issue a report to the Committee on Environment and
 3      Public Works of the Senate and the Committee on
 4      Transportation and Infrastructure of the House of
 5      Representatives on whether a modification to the
 6      project that is the subject of the proposal is necessary
 7      and recommended to carry out the authorized pur-
 8      poses of such project.
 9           (2) PROJECT PROPOSALS DESCRIBED.—A project
10      proposal referred to in paragraph (1) is a proposal
11      to modify any of the following:
12                 (A) The project for environmental infra-
13           structure, City of Sheffield, Alabama, authorized
14           pursuant to section 219(f)(78) of the Water Re-
15           sources Development Act of 1992 (106 Stat.
16           4835; 113 Stat. 335; 121 Stat. 1258; 130 Stat.
17           1687).
18                 (B) The project for environmental infra-
19           structure, Calaveras County, California, under
20           section 219(f)(86) of the Water Resources Devel-
21           opment Act of 1992 (106 Stat. 4835; 113 Stat.
22           335; 121 Stat. 1259).
23                 (C) The project for environmental infra-
24           structure, Charlotte County, Florida, authorized
25           by section 219(f)(121) of the Water Resources


     •S 1811 EAH
                               165
1            Development Act of 1992 (106 Stat. 4835; 113
2            Stat. 335; 121 Stat. 1261).
3                  (D) The Mississippi River and Tributaries
4            project authorized by the first section of the Act
5            of May 15, 1928 (33 U.S.C. 702a), to include the
6            portion of the Ouachita River Levee System at
7            and below Monroe, Louisiana, to Caldwell Par-
8            ish, Louisiana.
9                  (E) The project for environmental infra-
10           structure, Central New Mexico, authorized by
11           section 593 of the Water Resources Development
12           Act of 1999 (113 Stat. 380; 119 Stat. 2255).
13                 (F) The project for environmental infra-
14           structure, Village of Whitehall, New York, au-
15           thorized pursuant to section 542 of the Water
16           Resources Development Act of 2000 (114 Stat.
17           2671; 121 Stat. 1150).
18                 (G) The project for environmental infra-
19           structure, Ohio and North Dakota, authorized by
20           section 594 of the Water Resources Development
21           Act of 1999 (113 Stat. 383; 121 Stat. 1140; 121
22           Stat. 1944).
23                 (H) The project for flood risk management
24           and water supply, Tenkiller Ferry Lake, Arkan-
25           sas River Basin, Oklahoma, authorized by sec-


     •S 1811 EAH
                            166
1            tion 4 of the Act of June 28, 1938 (chapter 795,
2            52 Stat. 1218), to modify water storage to pro-
3            vide for a sufficient quantity of water supply
4            storage space in the inactive pool storage to sup-
5            port the fishery downstream from Tenkiller Res-
6            ervoir.
7                  (I) The project for environmental infra-
8            structure, Athens, Tennessee, authorized by sec-
9            tion 219(f)(254) of the Water Resources Develop-
10           ment Act of 1992 (106 Stat. 4835; 113 Stat. 335;
11           121 Stat. 1267).
12                 (J) The project for environmental infra-
13           structure, Blaine, Tennessee, authorized by sec-
14           tion 219(f)(255) of the Water Resources Develop-
15           ment Act of 1992 (106 Stat. 4835; 113 Stat. 335;
16           121 Stat. 1267).
17                 (K) The project for environmental infra-
18           structure, Claiborne County, Tennessee, author-
19           ized by section 219(f)(256) of the Water Re-
20           sources Development Act of 1992 (106 Stat.
21           4835; 113 Stat. 335; 121 Stat. 1267).
22                 (L) The project for environmental infra-
23           structure, Giles County, Tennessee, authorized by
24           section 219(f)(257) of the Water Resources Devel-




     •S 1811 EAH
                            167
1            opment Act of 1992 (106 Stat. 4835; 113 Stat.
2            335; 121 Stat. 1267).
3                  (M) The project for environmental infra-
4            structure, Grainger County, Tennessee, author-
5            ized by section 219(f)(258) of the Water Re-
6            sources Development Act of 1992 (106 Stat.
7            4835; 113 Stat. 335; 121 Stat. 1267).
8                  (N) The project for environmental infra-
9            structure, Hamilton County, Tennessee, author-
10           ized by section 219(f)(259) of the Water Re-
11           sources Development Act of 1992 (106 Stat.
12           4835; 113 Stat. 335; 121 Stat. 1267).
13                 (O) The project for environmental infra-
14           structure, Harrogate, Tennessee, authorized by
15           section 219(f)(260) of the Water Resources Devel-
16           opment Act of 1992 (106 Stat. 4835; 113 Stat.
17           335; 121 Stat. 1267).
18                 (P) The project for environmental infra-
19           structure, Johnson County, Tennessee, authorized
20           by section 219(f)(261) of the Water Resources
21           Development Act of 1992 (106 Stat. 4835; 113
22           Stat. 335; 121 Stat. 1267).
23                 (Q) The project for environmental infra-
24           structure, Knoxville, Tennessee, authorized by
25           section 219(f)(262) of the Water Resources Devel-


     •S 1811 EAH
                             168
1            opment Act of 1992 (106 Stat. 4835; 113 Stat.
2            335; 121 Stat. 1267).
3                  (R) The project for environmental infra-
4            structure, Lewis, Lawrence, and Wayne Coun-
5            ties, Tennessee, authorized by section 219(f)(264)
6            of the Water Resources Development Act of 1992
7            (106 Stat. 4835; 113 Stat. 335; 121 Stat. 1268).
8                  (S) The project for environmental infra-
9            structure, Nashville, Tennessee, authorized by
10           section 219(f)(263) of the Water Resources Devel-
11           opment Act of 1992 (106 Stat. 4835; 113 Stat.
12           335; 121 Stat. 1267).
13                 (T) The project for environmental infra-
14           structure, Oak Ridge, Tennessee, authorized by
15           section 219(f)(265) of the Water Resources Devel-
16           opment Act of 1992 (106 Stat. 4835; 113 Stat.
17           335; 121 Stat. 1268).
18                 (U) The project for environmental infra-
19           structure, Plateau Utility District, Morgan
20           County,    Tennessee,    authorized   by    section
21           219(f)(266) of the Water Resources Development
22           Act of 1992 (106 Stat. 4835; 113 Stat. 335; 121
23           Stat. 1268).
24                 (V) The authorized funding level for critical
25           restoration projects, Lake Champlain watershed,


     •S 1811 EAH
                             169
 1            Vermont and New York, authorized by section
 2            542 of the Water Resources Development Act of
 3            2000 (114 Stat. 2671; 121 Stat. 1150).
 4                  (W) The project for environmental infra-
 5            structure, Eastern Shore and Southwest Vir-
 6            ginia, authorized by section 219(f)(10) of the
 7            Water Resources Development Act of 1992 (106
 8            Stat. 4835; 113 Stat. 335; 121 Stat. 1255).
 9   SEC. 205. SELMA, ALABAMA.

10       Not later than 180 days after the date of enactment
11 of this Act, the Secretary shall submit to the Committee on
12 Transportation and Infrastructure of the House of Rep-
13 resentatives and the Committee on Environment and Public
14 Works of the Senate a report that—
15            (1) provides an update on the study for flood
16       risk management and riverbank stabilization, Selma,
17       Alabama, authorized by resolutions of the Committees
18       on Public Works and Rivers and Harbors of the
19       House of Representatives on June 7, 1961, and April
20       28, 1936, respectively, the completion of which the
21       Secretary was required to expedite by section 1203 of
22       the Water Resources Development Act of 2018 (132
23       Stat. 3803); and
24            (2) identifies project alternatives necessary to—




      •S 1811 EAH
                               170
 1                   (A) assure the preservation of cultural and
 2            historic values associated with national historic
 3            landmarks within the study area; and
 4                   (B) provide flood risk management for eco-
 5            nomically disadvantaged communities within the
 6            study area.
 7   SEC. 206. REPORT ON CORPS OF ENGINEERS FACILITIES IN

 8                  APPALACHIA.

 9       (a) IN GENERAL.—Not later than 180 days after the
10 date of enactment of this Act, the Secretary, in collaboration
11 with the Appalachian Regional Commission established by
12 section 14301(a) of title 40, United States Code, shall sub-
13 mit to the Committee on Environment and Public Works
14 of the Senate and the Committee on Transportation and
15 Infrastructure of the House of Representatives a report that
16 identifies each Corps of Engineers facility that—
17            (1) is located within a distressed county or an
18       at-risk county (as designated by the Appalachian Re-
19       gional Commission pursuant to subparagraph (A) or
20       (B) of section 14526(a)(1), of title 40, United States
21       Code), including in counties that are experiencing
22       high unemployment or job loss; and
23            (2) could be improved for purposes of economic
24       development, recreation, or other uses.
25       (b) HYDROPOWER FACILITIES.—


      •S 1811 EAH
                              171
 1            (1) IDENTIFICATION      OF   POTENTIAL    HYDRO-

 2       POWER DEVELOPMENT.—The Secretary shall include

 3       in the report submitted under subsection (a) the iden-
 4       tification of any existing nonpowered dams, located
 5       within a distressed county or an at-risk county, with
 6       the potential to be used to test, evaluate, pilot, dem-
 7       onstrate, or deploy hydropower or energy storage tech-
 8       nologies.
 9            (2) INFORMATION.—In carrying out this sub-
10       section, the Secretary may use any information devel-
11       oped pursuant to section 1206 of the Water Resources
12       Development Act of 2018 (132 Stat. 3806).
13            (3) COORDINATION.—In carrying out paragraph
14       (1), the Secretary shall coordinate with any relevant
15       National Laboratories.
16   SEC. 207. ADDITIONAL STUDIES UNDER NORTH ATLANTIC

17                   COAST COMPREHENSIVE STUDY.

18       (a) IN GENERAL.—The Secretary shall carry out a
19 study to determine the feasibility of a project for hurricane
20 and storm damage risk reduction for any major metropoli-
21 tan area located in the study area for the comprehensive
22 study authorized under the heading ‘‘Department of the
23 Army—Corps of Engineers—Civil—Investigations’’ under
24 the Disaster Relief Appropriations Act, 2013 (Public Law




      •S 1811 EAH
                              172
 1 113–2) that was not included in a high-risk focus area iden-
 2 tified in the study.
 3       (b) TREATMENT.—A study carried out under sub-
 4 section (a) shall be considered to be a continuation of the
 5 comprehensive study described in that subsection.
 6   SEC. 208. SOUTH ATLANTIC COASTAL STUDY.

 7       Section 1204 of the Water Resources Development Act
 8 of 2016 (130 Stat. 1685) is amended by adding at the end
 9 the following:
10       ‘‘(d) ANNUAL REPORTS.—Not later than 180 days
11 after the enactment of the Water Resources Development Act
12 of 2020, and not less frequently than annually thereafter
13 until 2025, the Secretary shall submit to the Committee on
14 Environment and Public Works of the Senate and the Com-
15 mittee on Transportation and Infrastructure of the House
16 of Representatives a report on the status of the study under
17 subsection (a), on a State-by-State basis, including infor-
18 mation on the engagement of the Corps of Engineers with
19 non-Federal interests, including detailed lists of all meet-
20 ings and decision outcomes associated with those engage-
21 ments.’’.
22   SEC. 209. COMPREHENSIVE STUDY OF THE SACRAMENTO

23                  RIVER, YOLO BYPASS, CALIFORNIA.

24       (a) COMPREHENSIVE STUDY.—The Secretary shall
25 conduct a comprehensive study of the Sacramento River in


      •S 1811 EAH
                               173
 1 the vicinity of the Yolo Bypass System, California, to iden-
 2 tify actions to be undertaken by the Secretary for the com-
 3 prehensive management of the Yolo Bypass System for the
 4 purposes of flood risk management, ecosystem restoration,
 5 water supply, hydropower, and recreation.
 6       (b) CONSULTATION AND USE OF EXISTING DATA.—
 7            (1) CONSULTATION.—In conducting the com-
 8       prehensive study under subsection (a), the Secretary
 9       shall consult with the Governor of the State of Cali-
10       fornia, applicable Federal, State, and local agencies,
11       non-Federal interests, the Yolo Bypass and Cache
12       Slough Partnership, and other stakeholders.
13            (2) USE OF EXISTING DATA AND PRIOR STUD-
14       IES.—To the maximum extent practicable and where

15       appropriate, the Secretary may—
16                  (A) make use of existing data provided to
17            the Secretary by the entities identified in para-
18            graph (1); and
19                  (B) incorporate—
20                      (i) relevant information from prior
21                  studies and projects carried out by the Sec-
22                  retary within the study area; and
23                      (ii) the latest technical data and sci-
24                  entific approaches to changing hydrologic
25                  and climatic conditions.


      •S 1811 EAH
                               174
 1       (c) RECOMMENDATIONS.—
 2            (1) IN GENERAL.—In conducting the comprehen-
 3       sive study under subsection (a), the Secretary may de-
 4       velop a recommendation to Congress for—
 5                  (A) the construction of a water resources de-
 6            velopment project;
 7                  (B) the structural or operational modifica-
 8            tion of an existing water resources development
 9            project;
10                  (C) additional monitoring of, or adaptive
11            management measures to carry out with respect
12            to, existing water resources development projects,
13            to respond to changing hydrologic and climatic
14            conditions; or
15                  (D) geographic areas within the Yolo By-
16            pass System for additional study by the Sec-
17            retary.
18            (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
19       bility study carried out pursuant to a recommenda-
20       tion under paragraph (1)(D) shall be considered to be
21       a continuation of the comprehensive study authorized
22       under subsection (a).
23       (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—
24 Not later than 3 years after the date of enactment of this
25 section, the Secretary shall submit to the Committee on


      •S 1811 EAH
                            175
 1 Transportation and Infrastructure of the House of Rep-
 2 resentatives and the Committee on Environment and Public
 3 Works of the Senate a report detailing—
 4           (1) the results of the comprehensive study con-
 5      ducted under subsection (a), including any rec-
 6      ommendations developed under subsection (c);
 7           (2) any additional, site-specific areas within the
 8      Yolo Bypass System where additional study for flood
 9      risk management or ecosystem restoration projects is
10      recommended by the Secretary; and
11           (3) any interim actions relating to existing
12      water resources development projects undertaken by
13      the Secretary during the study period.
14      (e) DEFINITIONS.—In this section:
15           (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo By-
16      pass System’’ means the system of weirs, levees, by-
17      pass structures, and other water resources develop-
18      ment projects in California’s Sacramento River Val-
19      ley, extending from the Fremont Weir near Woodland,
20      California, to the Sacramento River near Rio Vista,
21      California, authorized pursuant to section 2 of the
22      Act of March 1, 1917 (chapter 144; 39 Stat. 949).
23           (2) YOLO BYPASS AND CACHE SLOUGH PARTNER-
24      SHIP.—The    term ‘‘Yolo Bypass and Cache Slough
25      Partnership’’ means the group of parties to the Yolo


     •S 1811 EAH
                               176
 1       Bypass and Cache Slough Memorandum of Under-
 2       standing, effective May 2016, regarding collaboration
 3       and cooperation in the Yolo Bypass and Cache Slough
 4       region.
 5   SEC. 210. LAKE OKEECHOBEE REGULATION SCHEDULE,

 6                  FLORIDA.

 7       (a) IN GENERAL.—In carrying out the review of the
 8 Lake Okeechobee regulation schedule pursuant to section
 9 1106 of the Water Resources Development Act of 2018 (132
10 Stat. 3773), the Secretary shall—
11            (1) evaluate the implications of prohibiting re-
12       leases from Lake Okeechobee through the S–308 and
13       S–80 lock and dam structures, and evaluate sepa-
14       rately the implications of prohibiting high volume re-
15       leases through the S–77, S–78, and S–79 lock and
16       dam structures, on the operation of the lake in ac-
17       cordance with authorized purposes and seek to mini-
18       mize unnecessary releases to coastal estuaries; and
19            (2) to the maximum extent practicable, coordi-
20       nate with the ongoing efforts of Federal and State
21       agencies responsible for monitoring, forecasting, and
22       notification of cyanobacteria levels in Lake Okee-
23       chobee.
24       (b) MONTHLY REPORT.—Each month, the Secretary
25 shall make public a report, which may be based on the


      •S 1811 EAH
                             177
 1 Water Management Daily Operational Reports, disclosing
 2 the volumes of water deliveries to or discharges from Lake
 3 Okeechobee & Vicinity, Water Conservation Area I, Water
 4 Conservation Area II, Water Conservation Area III, East
 5 Coast Canals, and the South Dade Conveyance. Such report
 6 shall be aggregated and reported in a format designed for
 7 the general public, using maps or other widely understood
 8 communication tools.
 9       (c) EFFECT.—In carrying out the evaluation under
10 subsection (a)(1), nothing shall be construed to authorize
11 any new purpose for the management of Lake Okeechobee
12 or authorize the Secretary to affect any existing authorized
13 purpose, including flood protection and management of
14 Lake Okeechobee to provide water supply for all authorized
15 users.
16   SEC. 211. GREAT LAKES COASTAL RESILIENCY STUDY.

17       (a) IN GENERAL.—In carrying out the comprehensive
18 assessment of water resources needs for the Great Lakes Sys-
19 tem under section 729 of the Water Resources Development
20 Act of 1986 (33 U.S.C. 2267a), as required by section 1219
21 of the Water Resources Development Act of 2018 (132 Stat.
22 3811), the Secretary shall—
23            (1) taking into account recent high lake levels
24       within the Great Lakes, assess and make rec-
25       ommendations to Congress on—


      •S 1811 EAH
                             178
1                  (A) coastal storm and flood risk manage-
2            ment measures, including measures that use nat-
3            ural features and nature-based features, as those
4            terms are defined in section 1184 of the Water
5            Resources Development Act of 2016 (33 U.S.C.
6            2289a);
7                  (B) operation and maintenance of the Great
8            Lakes Navigation System, as such term is de-
9            fined in section 210 of the Water Resources De-
10           velopment Act of 1986 (33 U.S.C. 2238);
11                 (C) ecosystem protection and restoration;
12                 (D) the prevention and control of invasive
13           species and the effects of invasive species; and
14                 (E) recreation associated with water re-
15           sources development projects;
16           (2) prioritize actions necessary to protect critical
17      public infrastructure, communities, and critical nat-
18      ural or cultural resources; and
19           (3) to the maximum extent practicable and
20      where appropriate, utilize existing data provided to
21      the Secretary by Federal and State agencies, Indian
22      Tribes, and other stakeholders, including data ob-
23      tained through other Federal programs.
24      (b) RECOMMENDATIONS; ADDITIONAL STUDY.—




     •S 1811 EAH
                              179
 1           (1) IN     GENERAL.—In    carrying out the com-
 2      prehensive assessment described in subsection (a), the
 3      Secretary may make a recommendation to Congress
 4      for—
 5                 (A) the construction of a water resources de-
 6           velopment project;
 7                 (B) the structural or operational modifica-
 8           tion of an existing water resources development
 9           project;
10                 (C) additional monitoring of, or adaptive
11           management measures to carry out with respect
12           to, existing water resources development projects,
13           to respond to changing hydrologic and climatic
14           conditions; or
15                 (D) geographic areas within the Great
16           Lakes System for additional study by the Sec-
17           retary.
18           (2) FOCUS AREAS.—In addition to carrying out
19      subsection (a), to contribute to the comprehensive as-
20      sessment described in such subsection, the Secretary is
21      authorized to conduct feasibility studies for—
22                 (A) the project for coastal storm resiliency,
23           Lake Ontario shoreline, New York; and
24                 (B) the project for coastal storm resiliency,
25           Chicago shoreline, Illinois.


     •S 1811 EAH
                              180
 1            (3) ADDITIONAL CONSIDERATIONS.—Any feasi-
 2       bility study carried out pursuant to this subsection,
 3       including pursuant to a recommendation under para-
 4       graph (1)(D), shall be considered to be a continuation
 5       of the comprehensive assessment described in sub-
 6       section (a).
 7       (c) EXEMPTION FROM MAXIMUM STUDY COST AND
 8 DURATION LIMITATIONS.—Section 1001 of the Water Re-
 9 sources Reform and Development Act of 2014 (33 U.S.C.
10 2282c) shall not apply to any study recommended under
11 subsection (b)(1)(D) or carried out pursuant to subsection
12 (b)(2).
13   SEC. 212. REPORT ON THE STATUS OF RESTORATION IN

14                  THE LOUISIANA COASTAL AREA.

15       Not later than 1 year after the date of enactment of
16 this Act, the Coastal Louisiana Ecosystem Protection and
17 Restoration Task Force established by section 7004 of Water
18 Resources Development Act of 2007 (121 Stat. 1272) shall
19 submit to Congress a report that summarizes the activities
20 and recommendations of the Task Force, including—
21            (1) policies, strategies, plans, programs, projects,
22       and activities undertaken for addressing conservation,
23       protection, restoration, and maintenance of the coast-
24       al Louisiana ecosystem; and




      •S 1811 EAH
                                  181
1              (2) financial participation by each agency rep-
2        resented on the Task Force in conserving, protecting,
3        restoring, and maintaining the coastal Louisiana eco-
4        system.
5    SEC. 213. LOWER MISSISSIPPI RIVER COMPREHENSIVE

6                   MANAGEMENT STUDY.

7        (a) COMPREHENSIVE STUDY.—
 8             (1) PURPOSE.—The Secretary, in collaboration
 9       with the heads of other relevant Federal agencies and
10       pursuant to subsection (d)(1)(A), shall conduct a com-
11       prehensive study of the Lower Mississippi River
12       basin, from Cape Girardeau, Missouri, to the Gulf of
13       Mexico, to identify recommendations of actions to be
14       undertaken by the Secretary, under existing authori-
15       ties or after congressional authorization, for the com-
16       prehensive management of the basin for the purposes
17       of—
18                     (A) hurricane and storm damage reduction,
19             flood risk management, structural and non-
20             structural flood control, and floodplain manage-
21             ment strategies;
22                     (B) navigation;
23                     (C) ecosystem and environmental restora-
24             tion;
25                     (D) water supply;


      •S 1811 EAH
                             182
 1                 (E) hydropower production;
 2                 (F) recreation; and
 3                 (G) other purposes as determined by the
 4           Secretary.
 5           (2) DEVELOPMENT.—In conducting the com-
 6      prehensive study under paragraph (1), the Secretary
 7      shall investigate—
 8                 (A) the construction of new water resources
 9           development projects;
10                 (B) structural and operational modifica-
11           tions to completed water resources development
12           projects within the study area;
13                 (C) projects proposed in the comprehensive
14           coastal protection master plan entitled ‘‘Louisi-
15           ana’s Comprehensive Master Plan for a Sustain-
16           able Coast’’, prepared by the State of Louisiana
17           and accepted by the Louisiana Coastal Protec-
18           tion and Restoration Authority (including any
19           subsequent amendments or revisions), includ-
20           ing—
21                     (i) Ama sediment diversion;
22                     (ii) Union freshwater diversion;
23                     (iii) increase Atchafalaya flow to
24                 Terrebonne; and
25                     (iv) Manchac Landbridge diversion;


     •S 1811 EAH
                             183
1                  (D) natural features and nature-based fea-
2            tures, including levee setbacks and instream and
3            floodplain restoration;
4                  (E) fish and wildlife habitat resources, in-
5            cluding in the Mississippi Sound Estuary, the
6            Lake Pontchartrain Basin, the Breton Sound,
7            the Barataria Basin, the Terrebonne Basin, the
8            Atchafalaya Basin, the Vermilion–Teche Basin,
9            and other outlets of the Mississippi River and
10           Tributaries project;
11                 (F) mitigation of adverse impacts from op-
12           erations of flood control structures to the Mis-
13           sissippi Sound Estuary, the Lake Pontchartrain
14           Basin, the Breton Sound, the Barataria Basin,
15           the Atchafalaya Basin, and other outlets of the
16           Mississippi River and Tributaries project;
17                 (G) the effects of dredging and river-bottom
18           elevation changes on drainage efficiency;
19                 (H) the economic impacts of existing prac-
20           tices, including such impacts on coastal re-
21           sources;
22                 (I) monitoring requirements, including as
23           near-real time monitoring as practicable, and
24           adaptive management measures to respond to
25           changing conditions over time;


     •S 1811 EAH
                              184
 1                  (J) the division of responsibilities among
 2            the Federal Government and non-Federal inter-
 3            ests with respect to the purposes described in
 4            paragraph (1); and
 5                  (K) other matters, as determined by the Sec-
 6            retary.
 7       (b) CONSULTATION AND USE OF EXISTING DATA.—In
 8 conducting the comprehensive study under subsection (a),
 9 the Secretary shall consult with applicable Federal, State,
10 and local agencies, Indian Tribes, non-Federal interests,
11 and other stakeholders, and, to the maximum extent prac-
12 ticable and where appropriate, make use of existing data
13 provided to the Secretary by such entities or from any rel-
14 evant multistate monitoring programs.
15       (c) RECOMMENDATIONS.—In conducting the com-
16 prehensive study under subsection (a), the Secretary shall
17 develop actionable recommendations to Congress, including
18 for—
19            (1) the construction of new water resources devel-
20       opment projects to improve the maximum effective
21       river resource use and control;
22            (2) the structural or operational modification of
23       completed water resources development projects;
24            (3) such additional monitoring of, or adaptive
25       management measures to carry out with respect to,


      •S 1811 EAH
                              185
 1      completed water resources development projects, to re-
 2      spond to changing conditions;
 3           (4) improving the efficiency of operational and
 4      maintenance dredging within the study area;
 5           (5) whether changes are necessary to the Mis-
 6      sissippi River and Tributaries project within the
 7      study area;
 8           (6) other Federal and non-Federal action, where
 9      appropriate; and
10           (7) follow-up studies and data collection and
11      monitoring to be carried out by the relevant Federal
12      or State agency.
13      (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—
14           (1) ANNUAL REPORTS.—Not later than 1 year
15      after the date of enactment of this Act, and annually
16      thereafter until the final report under paragraph (2)
17      is submitted, the Secretary shall submit to the Com-
18      mittee on Transportation and Infrastructure of the
19      House of Representatives and the Committee on Envi-
20      ronment and Public Works of the Senate a report de-
21      tailing—
22                 (A) any interim actions relating to water
23           resources development projects within the study
24           area undertaken by the Secretary under existing
25           authority; and


     •S 1811 EAH
                               186
 1                 (B) any recommendations developed under
 2           subsection (c).
 3           (2) FINAL REPORT.—Not later than 5 years after
 4      the date of enactment of this section, the Secretary
 5      shall submit to the Committee on Transportation and
 6      Infrastructure of the House of Representatives and the
 7      Committee on Environment and Public Works of the
 8      Senate a final report detailing the results of the com-
 9      prehensive study required by this section, including
10      the recommendations developed under subsection (c).
11           (3) APPLICATION OF CERTAIN REQUIREMENTS.—
12      Section 1001(a) of the Water Resources Reform and
13      Development Act of 2014 (33 U.S.C. 2282c(a)) shall
14      not apply to the study carried out by the Secretary
15      under this section.
16      (e) FURTHER ANALYSIS.—
17           (1) IN GENERAL.—In conducting the comprehen-
18      sive study under subsection (a), the Secretary shall
19      carry out activities in geographic areas that warrant
20      additional analysis by the Corps of Engineers, in-
21      cluding feasibility studies.
22           (2) TREATMENT.—A feasibility study carried out
23      under paragraph (1) shall be considered to be a con-
24      tinuation of the comprehensive study conducted under
25      subsection (a).


     •S 1811 EAH
                               187
 1         (f) REQUIREMENTS.—The comprehensive study con-
 2 ducted under subsection (a) shall be carried out in accord-
 3 ance with the authorities for the Mississippi River and
 4 Tributaries project.
 5         (g) DEFINITIONS.—In this section:
 6             (1)   MISSISSIPPI     RIVER     AND   TRIBUTARIES

 7         PROJECT.—The term ‘‘Mississippi River and Tribu-

 8         taries project’’ means the Mississippi River and Trib-
 9         utaries project authorized by the first section of the
10         Act of May 15, 1928 (33 U.S.C. 702a).
11             (2) NATURAL     FEATURE;      NATURE-BASED   FEA-

12         TURE.—The    terms ‘‘natural feature’’ and ‘‘nature-
13         based feature’’ have the meanings given those terms in
14         section 1184 of the Water Resources Development Act
15         of 2016 (33 U.S.C. 2289a).
16         (h) AUTHORIZATION OF APPROPRIATIONS.—There is
17 authorized to be appropriated to carry out this section
18 $25,000,000, to remain available until expended.
19         (i) SAVINGS PROVISION.—Nothing in this section shall
20 delay or interfere with, or be construed as grounds for en-
21 joining construction of, authorized projects within the study
22 area.




      •S 1811 EAH
                              188
 1   SEC. 214. UPPER MISSISSIPPI RIVER COMPREHENSIVE

 2                  PLAN.

 3       (a) ASSESSMENT.—The Secretary shall conduct an as-
 4 sessment of the water resources needs of the Upper Mis-
 5 sissippi River under section 729 of the Water Resources De-
 6 velopment Act of 1986 (33 U.S.C. 2267a).
 7       (b) REQUIREMENTS.—The Secretary shall carry out
 8 the assessment under subsection (a) in accordance with the
 9 requirements in section 1206(b) of Water Resources Devel-
10 opment Act of 2016 (130 Stat. 1686).
11   SEC. 215. UPPER MISSOURI RIVER BASIN MAINSTEM DAM

12                  FISH LOSS RESEARCH.

13       (a) IN GENERAL.—Pursuant to section 22 of the Water
14 Resources Development Act of 1974 (42 U.S.C. 1962d–16),
15 the Secretary shall conduct research on the management of
16 fish losses through the mainstem dams of the Missouri River
17 Basin during periods of high flow.
18       (b) CONTENTS.—The research conducted under sub-
19 section (a) shall include an examination of—
20            (1) the effects of high flow rates through Upper
21       Missouri River Basin mainstem dam outlet works on
22       fish passage;
23            (2) options used by other Corps of Engineers dis-
24       trict offices to mitigate fish losses through dams; and




      •S 1811 EAH
                               189
 1            (3) the feasibility of implementing fish loss miti-
 2       gation options in the Upper Missouri River Basin
 3       mainstem dams, based on similar ongoing studies.
 4       (c) REPORT.—Not later than 18 months after the date
 5 of enactment of this Act, the Secretary shall submit to the
 6 Committee on Transportation and Infrastructure of the
 7 House of Representatives and the Committee on Environ-
 8 ment and Public Works of the Senate a report recom-
 9 mending a plan to address fish losses through mainstem
10 dams in the Upper Missouri River Basin.
11   SEC. 216. LOWER AND UPPER MISSOURI RIVER COM-

12                  PREHENSIVE FLOOD PROTECTION.

13       (a) ADDITIONAL STUDIES         FOR   LOWER MISSOURI
14 RIVER BASIN.—
15            (1) IN GENERAL.—Except as provided in para-
16       graph (2), upon the request of the non-Federal inter-
17       est for the Lower Missouri Basin study, the Secretary
18       shall expand the scope of such study to investigate
19       and provide recommendations relating to—
20                   (A) modifications to projects in Iowa, Kan-
21            sas, Nebraska, and Missouri authorized under
22            the Pick-Sloan Missouri River Basin Program
23            (authorized by section 9(b) of the Act of Decem-
24            ber 22, 1944 (chapter 665, 58 Stat. 891)) and
25            the Missouri River Bank Stabilization and Navi-


      •S 1811 EAH
                                190
 1             gation project (authorized by section 2 of the Act
 2             of March 2, 1945 (chapter 19, 59 Stat. 19)), in-
 3             cluding modifications to the authorized purposes
 4             of such projects to further flood risk management
 5             and resiliency; and
 6                 (B) modifications to non-Federal, publicly
 7             owned levees in the Lower Missouri River Basin.
 8             (2) EXCEPTION.—If the Secretary determines
 9      that expanding the scope of the Lower Missouri Basin
10      study as provided in paragraph (1) is not prac-
11      ticable, and the non-Federal interest for such study
12      concurs in such determination, the Secretary shall
13      carry out such additional studies as are necessary to
14      investigate the modifications described in paragraph
15      (1).
16             (3) CONTINUATION OF LOWER MISSOURI BASIN
17      STUDY.—The following studies shall be considered a

18      continuation of the Lower Missouri Basin study:
19                 (A) Any additional study carried out under
20             paragraph (2).
21                 (B) Any study recommended to be carried
22             out in a report that the Chief of Engineers pre-
23             pares for the Lower Missouri Basin study.
24                 (C) Any study recommended to be carried
25             out in a report that the Chief of Engineers pre-


     •S 1811 EAH
                              191
1            pares for an additional study carried out under
2            paragraph (2).
3                  (D) Any study spun off from the Lower
4            Missouri Basin study before the completion of
5            such study.
6                  (E) Any study spun off from an additional
7            study carried out under paragraph (2) before the
8            completion of such additional study.
 9           (4) RELIANCE ON EXISTING INFORMATION.—In
10      carrying out any study described in or authorized by
11      this subsection, the Secretary, to the extent prac-
12      ticable, shall rely on existing data and analysis, in-
13      cluding data and analysis prepared under section 22
14      of the Water Resources Development Act of 1974 (42
15      U.S.C. 1962d–16).
16           (5) CONSIDERATION; CONSULTATION.—In devel-
17      oping recommendations under paragraph (1), the Sec-
18      retary shall—
19                 (A) consider the use of—
20                      (i) structural and nonstructural meas-
21                 ures, including the setting back of levees and
22                 removing structures from areas of recurring
23                 flood vulnerability, where advantageous, to
24                 reduce flood risk and damages in the Lower
25                 Missouri River Basin; and


     •S 1811 EAH
                             192
 1                     (ii) where such features are locally ac-
 2                 ceptable, natural features or nature-based
 3                 features (as such terms are defined in sec-
 4                 tion 1184 of the Water Resources Develop-
 5                 ment Act of 2016 (33 U.S.C. 2289a); and
 6                 (B) consult with applicable Federal and
 7           State agencies, Indian Tribes, and other stake-
 8           holders within the Lower Missouri River Basin
 9           and solicit public comment on such recommenda-
10           tions.
11           (6) EXEMPTION FROM MAXIMUM STUDY COST
12      AND DURATION LIMITATIONS.—Section         1001 of the
13      Water Resources Reform and Development Act of
14      2014 (33 U.S.C. 2282c) shall not apply to the Lower
15      Missouri Basin study or any study described in para-
16      graph (3).
17           (7) PRECONSTRUCTION, ENGINEERING, AND DE-
18      SIGN.—Upon completion of a study authorized by this

19      subsection, if the Secretary determines that a rec-
20      ommended project, or modification to a project de-
21      scribed in paragraph (1), is justified, the Secretary
22      may proceed directly to preconstruction planning, en-
23      gineering, and design of the project or modification.
24           (8) TECHNICAL ASSISTANCE.—




     •S 1811 EAH
                              193
 1                 (A) IN   GENERAL.—For      the provision of
 2           technical assistance to support small commu-
 3           nities and economically disadvantaged commu-
 4           nities in the planning and design of flood risk
 5           management and flood risk resiliency projects in
 6           the Lower Missouri River Basin, for each of fis-
 7           cal years 2021 through 2026, there are author-
 8           ized to be appropriated—
 9                      (i) $2,000,000 to carry out section 206
10                 of the Flood Control Act of 1960 (33 U.S.C.
11                 709a), in addition to amounts otherwise au-
12                 thorized to carry out such section; and
13                      (ii) $2,000,000 to carry out section
14                 22(a)(2) of the Water Resources Develop-
15                 ment Act of 1974 (42 U.S.C. 1962d–16), in
16                 addition to amounts otherwise authorized to
17                 carry out such section.
18                 (B) CONDITIONS.—
19                      (i) LIMITATIONS NOT APPLICABLE.—
20                 The limitations on the use of funds in sec-
21                 tion 206(d) of the Flood Control Act of 1960
22                 and section 22(c)(2) of the Water Resources
23                 Development Act of 1974 shall not apply to
24                 the amounts authorized to be appropriated
25                 by subparagraph (A).


     •S 1811 EAH
                                194
 1                     (ii) RULE OF CONSTRUCTION.—Noth-
 2                 ing in this paragraph restricts the author-
 3                 ity of the Secretary to use any funds other-
 4                 wise appropriated to carry out section 206
 5                 of the Flood Control Act of 1960 or section
 6                 22(a)(2) of the Water Resources Develop-
 7                 ment Act of 1974 to provide technical as-
 8                 sistance described in subparagraph (A).
 9           (9) COMPLETION OF STUDY; REPORT TO CON-
10      GRESS.—Not later than 3 years after the date of en-

11      actment of this Act, the Secretary shall submit to the
12      Committee on Transportation and Infrastructure of
13      the House of Representatives and the Committee on
14      Environment and Public Works of the Senate a report
15      detailing—
16                 (A) the results of the study authorized by
17           this subsection;
18                 (B) any additional, site-specific areas with-
19           in the Lower Missouri River Basin for which ad-
20           ditional study for flood risk management projects
21           is recommended by the Secretary; and
22                 (C) any interim actions relating to existing
23           water resources development projects in the
24           Lower Missouri River Basin undertaken by the
25           Secretary during the study period.


     •S 1811 EAH
                              195
 1            (10) DEFINITIONS.—In this subsection:
 2                 (A) LOWER MISSOURI BASIN STUDY.—The
 3            term ‘‘Lower Missouri Basin study’’ means the
 4            Lower Missouri Basin Flood Risk and Resiliency
 5            Study, Iowa, Kansas, Nebraska, and Missouri,
 6            authorized pursuant to section 216 of the Flood
 7            Control Act of 1970 (33 U.S.C. 549a).
 8                 (B) SMALL COMMUNITY.—The term ‘‘small
 9            community’’ means a local government that
10            serves a population of less than 15,000.
11      (b) UPPER MISSOURI RIVER BASIN COMPREHENSIVE
12 STUDY.—
13            (1) IN GENERAL.—The Secretary, in collabora-
14      tion with the heads of other relevant Federal agencies,
15      shall conduct a comprehensive study to address flood
16      risk in areas affected by severe flooding in 2019 along
17      the Upper Missouri River, including an examination
18      of—
19                 (A) the use of structural and nonstructural
20            flood control and floodplain management strate-
21            gies, including the consideration of natural fea-
22            tures or nature-based features (as such terms are
23            defined in section 1184 of the Water Resources
24            Development Act of 2016 (33 U.S.C. 2289a);




     •S 1811 EAH
                               196
 1                   (B) continued operation and maintenance
 2           of the navigation project;
 3                   (C) management of bank caving and ero-
 4           sion;
 5                   (D) maintenance of water supply;
 6                   (E) fish and wildlife habitat management;
 7                   (F) recreation needs;
 8                   (G) environmental restoration needs;
 9                   (H) the division of responsibilities of the
10           Federal Government and non-Federal interests
11           with respect to Missouri River flooding;
12                   (I) the roles and responsibilities of Federal
13           agencies with respect to Missouri River flooding;
14           and
15                   (J) any other related matters, as determined
16           by the Secretary.
17           (2)     RECOMMENDATIONS.—In         conducting    the
18      study under this subsection, the Secretary may de-
19      velop recommendations to Congress for—
20                   (A) the construction of a water resources de-
21           velopment project;
22                   (B) the structural or operational modifica-
23           tion of an existing water resources development
24           project;




     •S 1811 EAH
                             197
1                  (C) such additional monitoring of, or
2            adaptive management measures to carry out
3            with respect to, existing water resources develop-
4            ment projects, to respond to changing conditions;
5                  (D) geographic areas within the Upper Mis-
6            souri River basin for additional study by the
7            Secretary;
8                  (E) management plans and actions to be
9            carried out by the responsible Federal agencies to
10           reduce flood risk and improve resiliency;
11                 (F) any necessary changes to the general
12           comprehensive plan for flood control and other
13           purposes in the Missouri River Basin under sec-
14           tion 4 of the Act of June 28, 1938 (chapter 795,
15           52 Stat. 1218; 58 Stat. 891); and
16                 (G) follow-up studies for problem areas for
17           which data or current technology does not allow
18           immediate solutions.
19           (3) COMPLETION OF STUDY; REPORT TO CON-
20      GRESS.—Not later than 3 years after the date of en-

21      actment of this subsection, the Secretary shall submit
22      to the Committee on Transportation and Infrastruc-
23      ture of the House of Representatives and the Com-
24      mittee on Environment and Public Works of the Sen-
25      ate a report that—


     •S 1811 EAH
                              198
1                  (A) contains the results of the comprehen-
2            sive study required by this subsection, including
3            any recommendations developed under para-
4            graph (2);
5                  (B) addresses—
6                        (i) the potential for the transfer of
7                  flood risk between and within the Upper
8                  and Lower Missouri River basins with re-
9                  spect to any changes recommended pursuant
10                 to paragraph (2)(F);
11                       (ii) adverse impacts to navigation and
12                 other authorized purposes of the applicable
13                 Missouri River project with respect to any
14                 changes    recommended    under   paragraph
15                 (2)(F); and
16                       (iii) whether there are opportunities
17                 for increased non-Federal management in
18                 the Upper Missouri River Basin;
19                 (C) recognizes—
20                       (i) the interest and rights of States
21                 in—
22                           (I) determining the development
23                       of watersheds within the borders of the
24                       State; and




     •S 1811 EAH
                             199
 1                           (II) water utilization and control;
 2                     and
 3                     (ii) the primary responsibilities of
 4                 States and local interests in developing
 5                 water supplies for domestic, municipal, in-
 6                 dustrial, and other purposes; and
 7                 (D) describes any interim actions relating
 8           to existing water resources development projects
 9           in the Upper Missouri River Basin undertaken
10           by the Secretary during the study period.
11           (4) CONSULTATION.—In carrying out this sub-
12      section, the Secretary shall consult with applicable
13      Federal and State agencies, Indian Tribes, and other
14      stakeholders within the Upper Missouri River Basin
15      and solicit public comment.
16           (5) RELIANCE ON EXISTING INFORMATION.—In
17      carrying out any study described in or authorized by
18      this subsection, the Secretary, to the extent prac-
19      ticable, shall rely on existing data and analysis, in-
20      cluding data and analysis prepared under section 22
21      of the Water Resources Development Act of 1974 (42
22      U.S.C. 1962d–16).
23           (6) EXEMPTION FROM MAXIMUM STUDY COST
24      AND DURATION LIMITATIONS.—Section          1001 of the
25      Water Resources Reform and Development Act of


     •S 1811 EAH
                              200
 1       2014 (33 U.S.C. 2282c) shall not apply to the com-
 2       prehensive study carried out under this section or any
 3       feasibility study described in paragraph (7).
 4            (7) ADDITIONAL CONSIDERATIONS.—Any feasi-
 5       bility study carried out pursuant to a recommenda-
 6       tion included in the report submitted under this sub-
 7       section shall be considered to be a continuation of the
 8       comprehensive study required under paragraph (1).
 9            (8) DEFINITION.—In this subsection, the term
10       ‘‘Missouri River project’’ means a project constructed
11       as part of—
12                  (A) the Pick-Sloan Missouri River Basin
13            Program (authorized by section 9(b) of the Act
14            of December 22, 1944 (chapter 665, 58 Stat.
15            891)), located in the States of Wyoming, Mon-
16            tana, North Dakota, or South Dakota;
17                  (B) the Missouri River Bank Stabilization
18            and Navigation project (authorized by section 2
19            of the Act of March 2, 1945 (chapter 19, 59 Stat.
20            19)); or
21                  (C) a non-Federal, publicly owned levee sys-
22            tem located within the Upper Missouri River
23            Basin.
24       (c) COORDINATION.—Upon completion of the studies
25 under subsections (a) and (b), the Secretary shall develop


      •S 1811 EAH
                               201
 1 a strategy that, to the maximum extent practicable, coordi-
 2 nates and aligns the results of such studies.
 3   SEC. 217. PORTSMOUTH HARBOR AND PISCATAQUA RIVER

 4                  AND RYE HARBOR, NEW HAMPSHIRE.

 5       (a) REQUIREMENT       TO    EXPEDITE.—The Secretary
 6 shall expedite authorized activities to address the impacts
 7 of shoaling affecting the project for navigation, Rye Harbor,
 8 New Hampshire, authorized by section 101 of the River and
 9 Harbor Act of 1960 (74 Stat. 480).
10       (b) STATUS UPDATE.—Not later than 180 days after
11 the date of enactment of this Act, the Secretary shall submit
12 to Congress a written status update regarding—
13            (1) the activities required to be expedited under
14       subsection (a); and
15            (2) the project for navigation, Portsmouth Har-
16       bor and Piscataqua River, authorized by section 101
17       of the River and Harbor Act of 1962 (76 Stat. 1173),
18       as required to be expedited under section 1317 of the
19       Water Resources Development Act of 2018 (132 Stat.
20       3823).
21   SEC. 218. COUGAR AND DETROIT DAMS, WILLAMETTE RIVER

22                  BASIN, OREGON.

23       (a) REPORT.—Not later than 2 years after the date
24 of enactment of this Act, the Secretary shall submit to the
25 Committee on Transportation and Infrastructure of the


      •S 1811 EAH
                              202
 1 House of Representatives and the Committee on Environ-
 2 ment and Public Works of the Senate, and make publicly
 3 available, a report providing an initial analysis of
 4 deauthorizing hydropower as a project purpose at the Cou-
 5 gar and Detroit Dams project.
 6       (b) CONTENTS.—The Secretary shall include in the re-
 7 port submitted under subsection (a)—
 8            (1) a description of the potential effects of
 9       deauthorizing hydropower as a project purpose at the
10       Cougar and Detroit Dams project on—
11                  (A) the operation of the project, including
12            with respect to the other authorized purposes of
13            the project;
14                  (B) compliance of the project with the En-
15            dangered Species Act;
16                  (C) costs that would be attributed to other
17            authorized purposes of the project, including
18            costs relating to compliance with such Act; and
19                  (D) other ongoing studies in the Willamette
20            River Basin; and
21            (2) identification of any further research needed.
22       (c) PROJECT DEFINED.—In this section, the terms
23 ‘‘Cougar and Detroit Dams project’’ and ‘‘project’’ mean
24 the Cougar Dam and Reservoir project and Detroit Dam
25 and Reservoir project, Willamette River Basin, Oregon, au-


      •S 1811 EAH
                             203
 1 thorized by section 204 of the Flood Control Act of 1950
 2 (64 Stat. 179), and facilities that operate in conjunction
 3 with the main Detroit Dam facility, including the Big Cliff
 4 re-regulating dam.
 5   SEC. 219. PORT ORFORD, OREGON.

 6       Not later than 180 days after the date of enactment
 7 of this Act, the Secretary shall, at Federal expense, submit
 8 to the Committee on Transportation and Infrastructure of
 9 the House of Representatives and the Committee on Envi-
10 ronment and Public Works of the Senate a summary report
11 on the research completed and data gathered by the date
12 of enactment of this Act with regards to the configuration
13 of a breakwater for the project for navigation, Port Orford,
14 Oregon, authorized by section 117 of the River and Harbor
15 Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for the pur-
16 poses of addressing shoaling issues to minimize long-term
17 maintenance costs.
18   SEC. 220. WILSON CREEK AND SLOAN CREEK, FAIRVIEW,

19                  TEXAS.

20       Not later than 180 days after the date of enactment
21 of this section, the Secretary shall submit to Congress a
22 written status update regarding efforts to address flooding
23 along Wilson Creek and Sloan Creek in the City of Fair-
24 view, Texas.




      •S 1811 EAH
                              204
 1   SEC. 221. STUDY ON WATER SUPPLY AND WATER CON-

 2                  SERVATION AT WATER RESOURCES DEVELOP-

 3                  MENT PROJECTS.

 4       (a) IN GENERAL.—Not later than 18 months after the
 5 date of enactment of this Act, the Secretary shall submit
 6 to the Committee on Transportation and Infrastructure of
 7 the House of the Representatives and the Committee on En-
 8 vironment and Public Works of the Senate a report that
 9 analyzes the benefits and consequences of including water
10 supply and water conservation as a primary mission of the
11 Corps of Engineers in carrying out water resources develop-
12 ment projects.
13       (b) INCLUSION.—The Secretary shall include in the re-
14 port submitted under subsection (a)—
15            (1) a description of existing water resources de-
16       velopment projects with water supply or water con-
17       servation as authorized purposes, and the extent to
18       which such projects are utilized for such purposes;
19            (2) a description of existing water resources de-
20       velopment projects with respect to which—
21                   (A) water supply or water conservation
22            could be added as a project purpose, including
23            those with respect to which a non-Federal inter-
24            est has expressed an interest in adding water
25            supply or water conservation as a project pur-
26            pose; and
      •S 1811 EAH
                              205
 1                   (B) such a purpose could be accommodated
 2            while maintaining existing authorized purposes;
 3            (3) a description of ongoing water resources de-
 4       velopment project studies the authorizations for which
 5       include authorization for the Secretary to study the
 6       feasibility of carrying out the project with a purpose
 7       of water supply or water conservation;
 8            (4) an analysis of how adding water supply and
 9       water conservation as a primary mission of the Corps
10       of Engineers would affect the ability of the Secretary
11       to carry out future water resources development
12       projects; and
13            (5) any recommendations of the Secretary relat-
14       ing to including water supply and water conservation
15       as a primary mission of the Corps of Engineers.
16   SEC. 222. REPORT TO CONGRESS ON AUTHORIZED STUDIES

17                  AND PROJECTS.

18       (a) IN GENERAL.—Not later than February 1 of each
19 year, the Secretary shall develop and submit to Congress
20 an annual report, to be entitled ‘‘Report to Congress on Au-
21 thorized Water Resources Development Projects and Stud-
22 ies’’, that identifies—
23            (1) ongoing or new feasibility studies, authorized
24       within the previous 20 years, for which a Report of
25       the Chief of Engineers has not been issued;


      •S 1811 EAH
                               206
 1           (2) authorized feasibility studies for projects in
 2      the preconstruction, engineering and design phase;
 3           (3) ongoing or new water resources development
 4      projects authorized for construction within the pre-
 5      vious 20 years; and
 6           (4) authorized and constructed water resources
 7      development projects the Secretary has the responsi-
 8      bility to operate or maintain.
 9      (b) CONTENTS.—
10           (1) INCLUSIONS.—
11                 (A) CRITERIA.—The Secretary shall include
12           in each report submitted under this section only
13           a feasibility study or water resources develop-
14           ment project—
15                      (i) that has been authorized by Con-
16                 gress to be carried out by the Secretary and
17                 does not require any additional congres-
18                 sional authorization to be carried out;
19                      (ii) that the Secretary has the capa-
20                 bility to carry out if funds are appropriated
21                 for such study or project under any of the
22                 ‘‘Investigations’’,   ‘‘Construction’’,   ‘‘Oper-
23                 ation and Maintenance’’, or ‘‘Mississippi
24                 River and Tributaries’’ appropriations ac-
25                 counts for the Corps of Engineers; and


     •S 1811 EAH
                             207
 1                     (iii) for which a non-Federal inter-
 2                 est—
 3                           (I) in the case of a study or a
 4                     project other than a project for which
 5                     funds may be appropriated for oper-
 6                     ation and maintenance, has entered
 7                     into a feasibility cost-sharing agree-
 8                     ment, design agreement, or project
 9                     partnership agreement with the Corps
10                     of Engineers, or has informed the Sec-
11                     retary that the non-Federal interest
12                     has the financial capability to enter
13                     into such an agreement within 1 year;
14                     and
15                           (II) demonstrates the legal and fi-
16                     nancial capability to satisfy the re-
17                     quirements for local cooperation with
18                     respect to the study or project.
19                 (B) DESCRIPTION OF BENEFITS.—
20                     (i)    DESCRIPTION.—The        Secretary
21                 shall, to the maximum extent practicable,
22                 describe in each report submitted under this
23                 section the benefits, as described in clause
24                 (ii), of each feasibility study and water re-




     •S 1811 EAH
                              208
 1                 sources development project included in the
 2                 report.
 3                      (ii) BENEFITS.—The benefits referred
 4                 to in clause (i) are benefits to—
 5                           (I) the protection of human life
 6                      and property;
 7                           (II) improvement to transpor-
 8                      tation;
 9                           (III) the national, regional, or
10                      local economy;
11                           (IV) the environment; or
12                           (V) the national security interests
13                      of the United States.
14           (2) TRANSPARENCY.—The Secretary shall in-
15      clude in each report submitted under this section, for
16      each feasibility study and water resources develop-
17      ment project included in the report—
18                 (A) the name of the associated non-Federal
19           interest, including the name of any non-Federal
20           interest that has contributed, or is expected to
21           contribute, a non-Federal share of the cost of the
22           study or project;
23                 (B) the purpose of the study or project;
24                 (C) an estimate, to the extent practicable, of
25           the Federal, non-Federal, and total costs of the


     •S 1811 EAH
                              209
 1           study or project, including, to the extent prac-
 2           ticable, the fully funded capability of the Corps
 3           of Engineers for—
 4                      (i) the 3 fiscal years following the fis-
 5                 cal year in which the report is submitted,
 6                 in the case of a feasibility study; and
 7                      (ii) the 5 fiscal years following the fis-
 8                 cal year in which the report is submitted,
 9                 in the case of a water resources development
10                 project; and
11                 (D) an estimate, to the extent practicable, of
12           the monetary and nonmonetary benefits of the
13           study or project.
14           (3) CERTIFICATION.—The Secretary shall include
15      in each report submitted under this section a certifi-
16      cation stating that each feasibility study or water re-
17      sources development project included in the report
18      meets the criteria described in paragraph (1)(A).
19           (4) OMISSIONS.—
20                 (A) LIMITATION.—The Secretary shall not
21           omit from a report submitted under this section
22           a study or project that otherwise meets the cri-
23           teria for inclusion in the report solely on the
24           basis of a policy of the Secretary.




     •S 1811 EAH
                                210
 1                 (B) APPENDIX.—If the Secretary omits
 2           from a report submitted under this section a
 3           study or project that otherwise meets the criteria
 4           for inclusion in the report, the Secretary shall
 5           include with the report an appendix that lists
 6           the name of the study or project and reason for
 7           its omission.
 8      (c) SUBMISSION TO CONGRESS; PUBLICATION.—
 9           (1) SUBMISSION TO CONGRESS.—The Secretary
10      may submit a report under this section in conjunc-
11      tion with the submission of the annual report under
12      section 7001 of the Water Resources Reform and De-
13      velopment Act of 2014 (33 U.S.C. 2282d).
14           (2) PUBLICATION.—On submission of each report
15      under this section, the Secretary shall make the report
16      publicly available, including through publication on
17      the internet.
18      (d) DEFINITIONS.—In this section:
19           (1) NON-FEDERAL INTEREST.—The term ‘‘non-
20      Federal interest’’ has the meaning given that term in
21      section 221 of the Flood Control Act of 1970 (42
22      U.S.C. 1962d–5b).
23           (2)        WATER     RESOURCES     DEVELOPMENT

24      PROJECT.—The       term ‘‘water resources development
25      project’’ includes a separable element of a project, a


     •S 1811 EAH
                                 211
 1       project under an environmental infrastructure assist-
 2       ance program, and a project the authorized purposes
 3       of which include water supply.
 4   SEC. 223. COMPLETION OF REPORTS AND MATERIALS.

 5       (a) IN GENERAL.—Using available appropriations,
 6 not later than 180 days after the date of enactment of this
 7 section, the Secretary shall complete and submit to Congress
 8 the following materials:
 9            (1) The report required by section 1211 of the
10       Water Resources Development Act of 2018 (132 Stat.
11       3808).
12            (2) Implementation guidance for the amend-
13       ments made by section 1176 of the Water Resources
14       Development Act of 2016 (130 Stat. 1673).
15            (3) Implementation guidance for the amend-
16       ments made by section 3029(a) of the Water Resources
17       Reform and Development Act of 2014 (128 Stat.
18       1305).
19            (4) Any other report or other material required
20       to be submitted to Congress by any of the following
21       Acts (including by amendments made by such Acts)
22       that has not been so submitted by the date of enact-
23       ment of this section:
24                  (A) The Water Resources Reform and Devel-
25            opment Act of 2014 (Public Law 113–121).


      •S 1811 EAH
                               212
 1                  (B) The Water Resources Development Act
 2            of 2016 (Public Law 114–322).
 3                  (C) The Water Resources Development Act
 4            of 2018 (Public Law 115–270).
 5        (b) USE OF EXISTING DATA.—To the extent prac-
 6 ticable and appropriate, the Secretary shall use existing
 7 data in completing any materials described in subsection
 8 (a).
 9        (c) FAILURE TO SUBMIT.—If the Secretary fails to
10 submit materials as required by this section, the Secretary
11 shall immediately inform the Committee on Environment
12 and Public Works of the Senate and the Committee on
13 Transportation and Infrastructure of the House of Rep-
14 resentatives, in writing, of the specific reasons for such fail-
15 ure and a timeline for submission of the delinquent mate-
16 rials.
17        (d) IMPLEMENTATION GUIDANCE.—The Secretary
18 shall expeditiously issue any guidance necessary to imple-
19 ment any provision of this Act, including any amendments
20 made by this Act, in accordance with section 1105 of the
21 Water Resources Development Act of 2018 (33 U.S.C. 2202).
22   SEC. 224. EMERGENCY FLOODING PROTECTION FOR LAKES.

23        The Secretary shall submit to Congress a report on the
24 extent to which section 5 of the Act of August 18, 1941 (33
25 U.S.C. 701n), applies to lakes, including lakes with the flow


      •S 1811 EAH
                              213
 1 of a slow-moving river, including, if applicable, rec-
 2 ommendations for legislative changes to ensure that such
 3 lakes are eligible for the program carried out pursuant to
 4 such section.
 5   SEC. 225. REPORT ON DEBRIS REMOVAL.

 6       Section 1210 of the Water Resources Development Act
 7 of 2018 (132 Stat. 3808) is amended to read as follows:
 8   ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.

 9       ‘‘(a) IN GENERAL.—Not later than 180 days after the
10 date of enactment of the Water Resources Development Act
11 of 2020, the Secretary shall submit to Congress and make
12 publicly available a report that describes—
13            ‘‘(1) the extent to which, during the 10 fiscal
14       years prior to such date of enactment, the Secretary
15       has carried out section 3 of the Act of March 2, 1945
16       (33 U.S.C. 603a);
17            ‘‘(2) how the Secretary has evaluated potential
18       work to be carried out under that section; and
19            ‘‘(3) the extent to which the Secretary plans to
20       start, continue, or complete debris removal activities
21       in the 3 years following submission of the report.
22       ‘‘(b) FOCUS AREAS.—The Secretary shall include in
23 the report submitted under subsection (a)—
24            ‘‘(1) identification of the debris removal activi-
25       ties to be started, continued, or completed during the


      •S 1811 EAH
                               214
 1       first fiscal year following the date of enactment of this
 2       subsection within the boundaries of the North Atlantic
 3       Division of the Corps of Engineers;
 4            ‘‘(2) the estimated total costs and completion
 5       dates for such activities; and
 6            ‘‘(3) identification of the non-Federal interest as-
 7       sociated with such activities.’’.
 8   SEC. 226. REPORT ON ANTECEDENT HYDROLOGIC CONDI-

 9                  TIONS.

10       (a) REPORT.—
11            (1) IN GENERAL.—Not later than 18 months
12       after the date of enactment of this Act, the Secretary
13       shall submit to the Committee on Environment and
14       Public Works of the Senate and the Committee on
15       Transportation and Infrastructure of the House of
16       Representatives a report on the use by the Corps of
17       Engineers since 2010 of data relating to antecedent
18       hydrologic conditions in the Missouri River Basin
19       (including soil moisture conditions, frost depths,
20       snowpack, and streamflow conditions) in—
21                   (A) conducting Missouri River mainstem
22            reservoir operations under the Missouri River
23            Master Manual;
24                   (B) developing related annual operating
25            plans; and


      •S 1811 EAH
                               215
1                  (C) performing seasonal, monthly, and
2            daily operations.
 3           (2) INCLUSIONS.—The report submitted under
 4      paragraph (1) shall include—
 5                 (A) a review of—
 6                      (i) the approach of the Corps of Engi-
 7                 neers to forecasting basin runoff in devel-
 8                 oping annual operating plans of the Corps
 9                 of Engineers;
10                      (ii) the assessment of existing and al-
11                 ternative algorithms that could improve
12                 basin runoff forecasting;
13                      (iii) the approach of the Corps of En-
14                 gineers for reservoir releases in the winter,
15                 spring, summer, and fall, based on basin
16                 runoff forecasts;
17                      (iv) the technical report of the Corps of
18                 Engineers     entitled     ‘‘Long-Term     Runoff
19                 Forecasting’’, dated February, 2017;
20                      (v) the use by the Corps of Engineers
21                 of data from Federal and State entities in
22                 basin runoff forecasts; and
23                      (vi) the use by the Corps of Engineers
24                 of   advanced       data   collection,   including




     •S 1811 EAH
                               216
 1                   through the use of unmanned aerial sys-
 2                   tems, forecasting, and modeling;
 3                   (B) findings and recommendations on how
 4            to best incorporate antecedent basin conditions
 5            in annual operating plans and Missouri River
 6            mainstem reservoir operations; and
 7                   (C) the results of the peer review conducted
 8            under subsection (b).
 9        (b) PEER REVIEW.—The Secretary shall seek to enter
10 into an agreement with the National Academy of Sciences
11 or a similar independent scientific and technical advisory
12 organization to establish a panel of experts to conduct a
13 peer review of the report to be submitted under subsection
14 (a).
15        (c) AUTHORIZATION OF APPROPRIATIONS.—There are
16 authorized to be appropriated to the Secretary—
17            (1) $5,000,000 to carry out subsection (a); and
18            (2) $5,000,000 to carry out subsection (b).
19   SEC. 227. SUBSURFACE DRAIN SYSTEMS RESEARCH AND

20                  DEVELOPMENT.

21        Subject to the availability of appropriations, the Sec-
22 retary, acting through the Director of the Engineer Research
23 and Development Center and, where appropriate, in con-
24 sultation with other Federal agencies, shall carry out re-




      •S 1811 EAH
                              217
 1 search and development activities relating to the use of sub-
 2 surface drain systems as—
 3            (1) a flood risk-reduction measure; or
 4            (2) a coastal storm risk-reduction measure.
 5   SEC. 228. REPORT ON CORROSION PREVENTION ACTIVI-

 6                  TIES.

 7       Not later than 180 days after the date of enactment
 8 of this Act, the Secretary shall submit to the Committee on
 9 Transportation and Infrastructure of the House of Rep-
10 resentatives and the Committee on Environment and Public
11 Works of the Senate, and make publicly available, a report
12 that describes—
13            (1) the extent to which the Secretary has carried
14       out section 1033 of the Water Resources Reform and
15       Development Act of 2014 (33 U.S.C. 2350);
16            (2) the extent to which the Secretary has incor-
17       porated corrosion prevention activities (as defined in
18       such section) at water resources development projects
19       constructed or maintained by the Secretary since the
20       date of enactment of such section; and
21            (3) in instances where the Secretary has not in-
22       corporated corrosion prevention activities at such
23       water resources development projects since such date,
24       an explanation as to why such corrosion prevention
25       activities have not been incorporated.


      •S 1811 EAH
                               218
 1   SEC. 229. ANNUAL REPORTING ON DISSEMINATION OF IN-

 2                  FORMATION.

 3       Section 1104(b) of the Water Resources Development
 4 Act of 2018 (33 U.S.C. 2282d note) is amended—
 5            (1) by redesignating paragraphs (1) through (4)
 6       as subparagraphs (A) through (D), respectively, and
 7       indenting appropriately;
 8            (2) in the matter preceding subparagraph (A)
 9       (as so redesignated), by striking ‘‘The Secretary’’ and
10       inserting the following:
11            ‘‘(1) IN GENERAL.—The Secretary’’; and
12            (3) by adding at the end the following:
13            ‘‘(2) ANNUAL REPORTING.—Not less frequently
14       than annually, the Secretary shall provide to the
15       Committee on Environment and Public Works of the
16       Senate and the Committee on Transportation and In-
17       frastructure of the House of Representatives a written
18       update on the progress of the implementation of para-
19       graph (1), including a description of each education
20       and outreach action the Secretary is taking to imple-
21       ment that paragraph.
22            ‘‘(3) GUIDANCE;       COMPLIANCE.—The     Secretary
23       shall—
24                   ‘‘(A) issue guidance on the uniform imple-
25            mentation by each district of the Corps of Engi-
26            neers of the process for submitting proposals
      •S 1811 EAH
                                219
 1            under section 7001 of the Water Resources Re-
 2            form and Development Act of 2014 (33 U.S.C.
 3            2282d); and
 4                   ‘‘(B) each year, ensure compliance with the
 5            guidance issued under subparagraph (A).’’.
 6   SEC. 230. REPORT ON BENEFITS CALCULATION FOR FLOOD

 7                  CONTROL STRUCTURES.

 8       Not later than 180 days after the date of enactment
 9 of this Act, the Secretary shall submit to the Committee on
10 Environment and Public Works of the Senate and the Com-
11 mittee on Transportation and Infrastructure of the House
12 of Representatives a report on the extent to which flood in-
13 surance premium reductions that result from implementa-
14 tion of a flood risk management project, including struc-
15 tural elements, nonstructural elements, or natural features
16 or nature-based features, are included in the calculation of
17 the benefits of the project by the Corps of Engineers.
18    TITLE III—DEAUTHORIZATIONS
19        AND MODIFICATIONS
20   SEC. 301. DEAUTHORIZATION OF INACTIVE PROJECTS.

21       (a) PURPOSES.—The purposes of this section are—
22            (1) to identify water resources development
23       projects authorized by Congress that are no longer
24       viable for construction due to—
25                   (A) a lack of local support;


      •S 1811 EAH
                                220
 1                   (B) a lack of available Federal or non-Fed-
 2           eral resources; or
 3                   (C) an authorizing purpose that is no
 4           longer relevant or feasible;
 5           (2) to create an expedited and definitive process
 6      for Congress to deauthorize water resources develop-
 7      ment projects that are no longer viable for construc-
 8      tion; and
 9           (3) to allow the continued authorization of water
10      resources development projects that are viable for con-
11      struction.
12      (b) PROPOSED DEAUTHORIZATION LIST.—
13           (1) PRELIMINARY LIST OF PROJECTS.—
14                   (A) IN GENERAL.—The Secretary shall de-
15           velop a preliminary list of each water resources
16           development project, or separable element of a
17           project, authorized for construction before No-
18           vember 8, 2007, for which—
19                        (i) planning, design, or construction
20                   was not initiated before the date of enact-
21                   ment of this Act; or
22                        (ii) planning, design, or construction
23                   was initiated before the date of enactment of
24                   this Act, but for which no funds, Federal or
25                   non-Federal, were obligated for planning,


     •S 1811 EAH
                              221
 1                 design, or construction of the project or sep-
 2                 arable element of the project during the cur-
 3                 rent fiscal year or any of the 10 preceding
 4                 fiscal years.
 5                 (B) USE OF COMPREHENSIVE CONSTRUC-
 6           TION BACKLOG AND OPERATION AND MAINTE-

 7           NANCE REPORT.—The Secretary may develop the

 8           preliminary list from the comprehensive con-
 9           struction backlog and operation and mainte-
10           nance reports developed pursuant to section
11           1001(b)(2) of the Water Resources Development
12           Act of 1986 (33 U.S.C. 579a).
13                 (C) EXCLUSIONS.—The Secretary shall not
14           include on the preliminary list—
15                      (i) an environmental infrastructure as-
16                 sistance project authorized to be carried out
17                 by the Secretary (including a project au-
18                 thorized pursuant to an environmental as-
19                 sistance program); or
20                      (ii) a project or separable element of a
21                 project authorized as part of the Com-
22                 prehensive Everglades Restoration Plan de-
23                 scribed in section 601 of the Water Re-
24                 sources Development Act of 2000 (114 Stat.
25                 2680).


     •S 1811 EAH
                             222
 1           (2) PREPARATION OF PROPOSED DEAUTHORIZA-
 2      TION LIST.—

 3                 (A) DEAUTHORIZATION AMOUNT.—The Sec-
 4           retary shall prepare a proposed list of projects
 5           for deauthorization comprised of a subset of
 6           projects and separable elements identified on the
 7           preliminary list developed under paragraph (1)
 8           that have, in the aggregate, an estimated Federal
 9           cost to complete that is at least $10,000,000,000.
10                 (B) DETERMINATION OF FEDERAL COST TO
11           COMPLETE.—For purposes of subparagraph (A),

12           the Federal cost to complete shall take into ac-
13           count any allowances authorized by section 902
14           of the Water Resources Development Act of 1986
15           (33 U.S.C. 2280), as applied to the most recent
16           project schedule and cost estimate.
17                 (C) INCLUSION OF DEAUTHORIZATION OF
18           ANTIQUATED PROJECTS.—The Secretary shall re-

19           duce the amount identified for deauthorization
20           under paragraph (2)(A) by an amount equiva-
21           lent to the estimated current value of each
22           project, or separable element of a project, that is
23           deauthorized by subsection (f).
24           (3) SEQUENCING OF PROJECTS.—




     •S 1811 EAH
                            223
 1                 (A) IN   GENERAL.—The      Secretary shall
 2           identify projects and separable elements for in-
 3           clusion on the proposed list of projects for de-
 4           authorization under paragraph (2) according to
 5           the order in which the projects and separable ele-
 6           ments were authorized, beginning with the ear-
 7           liest authorized projects and separable elements
 8           and ending with the latest project or separable
 9           element necessary to meet the aggregate amount
10           under paragraph (2)(A).
11                 (B) FACTORS TO CONSIDER.—The Secretary
12           may identify projects and separable elements in
13           an order other than that established by subpara-
14           graph (A) if the Secretary determines, on a case-
15           by-case basis, that a project or separable element
16           is critical for interests of the United States,
17           based on the possible impact of the project or
18           separable element on public health and safety,
19           the national economy, or the environment.
20           (4) PUBLIC COMMENT AND CONSULTATION.—
21                 (A) IN GENERAL.—The Secretary shall so-
22           licit comments from the public and the Gov-
23           ernors of each applicable State on the proposed
24           deauthorization list prepared under paragraph
25           (2)(A).


     •S 1811 EAH
                              224
 1                 (B) COMMENT PERIOD.—The public com-
 2           ment period shall be 90 days.
 3           (5) PREPARATION OF FINAL DEAUTHORIZATION
 4      LIST.—

 5                 (A) IN GENERAL.—The Secretary shall pre-
 6           pare a final deauthorization list by—
 7                      (i) considering any comments received
 8                 under paragraph (4); and
 9                      (ii) revising the proposed deauthoriza-
10                 tion list prepared under paragraph (2)(A)
11                 as the Secretary determines necessary to re-
12                 spond to such comments.
13                 (B) APPENDIX.—The Secretary shall in-
14           clude as part of the final deauthorization list an
15           appendix that—
16                      (i) identifies each project or separable
17                 element on the proposed deauthorization list
18                 that is not included on the final deauthor-
19                 ization list; and
20                      (ii) describes the reasons why the
21                 project or separable element is not included
22                 on the final deauthorization list.
23      (c) SUBMISSION OF FINAL DEAUTHORIZATION LIST TO
24 CONGRESS FOR CONGRESSIONAL REVIEW; PUBLICATION.—




     •S 1811 EAH
                               225
 1           (1) IN GENERAL.—Not later than 90 days after
 2      the date of the close of the comment period under sub-
 3      section (b)(4), the Secretary shall—
 4                 (A) submit the final deauthorization list
 5           and appendix prepared under subsection (b)(5)
 6           to the Committee on Transportation and Infra-
 7           structure of the House of Representatives and the
 8           Committee on Environment and Public Works of
 9           the Senate; and
10                 (B) publish the final deauthorization list
11           and appendix in the Federal Register.
12           (2) EXCLUSIONS.—The Secretary shall not in-
13      clude in the final deauthorization list submitted
14      under paragraph (1) any project or separable element
15      with respect to which Federal funds for planning, de-
16      sign, or construction are obligated after the develop-
17      ment of the preliminary list under subsection
18      (b)(1)(A) but prior to the submission of the final de-
19      authorization list under paragraph (1)(A) of this sub-
20      section.
21      (d) DEAUTHORIZATION; CONGRESSIONAL REVIEW.—
22           (1) IN GENERAL.—After the expiration of the 2-
23      year period beginning on the date of publication of
24      the final deauthorization list and appendix under
25      subsection (c)(1)(B), a project or separable element of


     •S 1811 EAH
                             226
 1      a project identified in the final deauthorization list is
 2      hereby deauthorized, unless Congress passes a joint
 3      resolution disapproving the final deauthorization list
 4      prior to the end of such period.
 5           (2) NON-FEDERAL CONTRIBUTIONS.—
 6                 (A) IN GENERAL.—A project or separable
 7           element of a project identified in the final de-
 8           authorization list under subsection (c) shall not
 9           be deauthorized under this subsection if, before
10           the expiration of the 2-year period referred to in
11           paragraph (1), the non-Federal interest for the
12           project or separable element of the project pro-
13           vides sufficient funds to complete the project or
14           separable element of the project.
15                 (B) TREATMENT OF PROJECTS.—Notwith-
16           standing subparagraph (A), each project and
17           separable element of a project identified in the
18           final deauthorization list shall be treated as de-
19           authorized for purposes of the aggregate de-
20           authorization amount specified in subsection
21           (b)(2)(A).
22           (3) PROJECTS      IDENTIFIED    IN   APPENDIX.—A

23      project or separable element of a project identified in
24      the appendix to the final deauthorization list shall re-
25      main subject to future deauthorization by Congress.


     •S 1811 EAH
                             227
1       (e) SPECIAL RULES.—
 2           (1) POST-AUTHORIZATION STUDIES.—A project
 3      or separable element of a project may not be identi-
 4      fied on the proposed deauthorization list developed
 5      under subsection (b), or the final deauthorization list
 6      developed under subsection (c), if the project or sepa-
 7      rable element received funding for a post-authoriza-
 8      tion study during the current fiscal year or any of the
 9      10 preceding fiscal years.
10           (2) TREATMENT OF PROJECT MODIFICATIONS.—
11      For purposes of this section, if an authorized water
12      resources development project or separable element of
13      the project has been modified by an Act of Congress,
14      the date of the authorization of the project or sepa-
15      rable element shall be deemed to be the date of the
16      most recent such modification.
17      (f) DEAUTHORIZATION OF ANTIQUATED PROJECTS.—
18           (1) IN GENERAL.—Any water resources develop-
19      ment project, or separable element of a project, au-
20      thorized for construction prior to November 17, 1986,
21      for which construction has not been initiated prior to
22      the date of enactment of this Act, or for which funds
23      have not been obligated for construction in the 10-
24      year period prior to the date of enactment of this Act,
25      is hereby deauthorized.


     •S 1811 EAH
                              228
 1            (2) IDENTIFICATION.—Not later than 60 days
 2       after the date of enactment of this Act, the Secretary
 3       shall issue to the Committee on Transportation and
 4       Infrastructure of the House of Representatives and the
 5       Committee on Environment and Public Works of the
 6       Senate a report that identifies—
 7                  (A) the name of each project, or separable
 8            element of a project, deauthorized by paragraph
 9            (1); and
10                  (B) the estimated current value of each such
11            project or separable element of a project.
12       (g) ECONOMIC AND ENVIRONMENTAL REVIEW OF INAC-
13   TIVE WATER RESOURCES DEVELOPMENT PROJECTS.—The

14 Secretary or the non-Federal interest may not carry out
15 any authorized water resources development project, or sep-
16 arable element of such project, for which construction has
17 not been initiated in the 20-year period following the date
18 of the authorization of such project or separable element,
19 until—
20            (1) the Secretary provides to the Committee on
21       Transportation and Infrastructure of the House of
22       Representatives and the Committee on Environment
23       and Public Works of the Senate a post-authorization
24       change report that updates the economic and environ-




      •S 1811 EAH
                              229
 1      mental analysis of the project or separable element;
 2      and
 3            (2) the Committee on Transportation and Infra-
 4      structure of the House of Representatives and the
 5      Committee on Environment and Public Works of the
 6      Senate take appropriate action to address any modi-
 7      fications to the economic and environmental analysis
 8      for the project or separable element of the project con-
 9      tained in the post-authorization change report.
10      (h) DEFINITIONS.—In this section:
11            (1) POST-AUTHORIZATION       CHANGE REPORT.—

12      The term ‘‘post-authorization change report’’ has the
13      meaning given such term in section 1132(d) of the
14      Water Resources Development Act of 2016 (33 U.S.C.
15      2282e).
16            (2) POST-AUTHORIZATION        STUDY.—The      term
17      ‘‘post-authorization study’’ means—
18                 (A) a feasibility report developed under sec-
19            tion 905 of the Water Resources Development Act
20            of 1986 (33 U.S.C. 2282);
21                 (B) a feasibility study, as defined in section
22            105(d) of the Water Resources Development Act
23            of 1986 (33 U.S.C. 2215(d)); or




     •S 1811 EAH
                                 230
 1                   (C) a review conducted under section 216 of
 2              the Flood Control Act of 1970 (33 U.S.C. 549a),
 3              including an initial appraisal that—
 4                         (i) demonstrates a Federal interest;
 5                   and
 6                         (ii) requires additional analysis for the
 7                   project or separable element.
 8   SEC. 302. ABANDONED AND INACTIVE NONCOAL MINE RES-

 9                  TORATION.

10       Section 560(f) of the Water Resources Development Act
11 of 1999 (33 U.S.C. 2336(f)) is amended by striking
12 ‘‘$20,000,000’’ and inserting ‘‘$30,000,000’’.
13   SEC. 303. TRIBAL PARTNERSHIP PROGRAM.

14       Section 203(b)(4) of the Water Resources Development
15 Act of 2000 (33 U.S.C. 2269) is amended by striking
16 ‘‘$12,500,000’’ each place it appears and inserting
17 ‘‘$18,500,000’’.
18   SEC. 304. LAKES PROGRAM.

19       Section 602(a) of the Water Resources Development
20 Act of 1986 (Public Law 99–662, 100 Stat. 4148; 110 Stat.
21 3758; 113 Stat. 295; 121 Stat. 1076) is amended—
22              (1) in paragraph (27), by striking ‘‘and’’ at the
23       end;
24              (2) in paragraph (28), by striking the period at
25       the end and inserting a semicolon; and


      •S 1811 EAH
                              231
 1            (3) by adding at the end the following:
 2            ‘‘(29) Ellis Pond and Guild Pond, Norwood,
 3       Massachusetts; and
 4            ‘‘(30) Memorial Pond, Walpole, Massachusetts.’’.
 5   SEC. 305. REHABILITATION OF CORPS OF ENGINEERS CON-

 6                  STRUCTED DAMS.

 7       Section 1177 of the Water Resources Development Act
 8 of 2016 (33 U.S.C. 467f–2 note) is amended—
 9            (1) in subsection (e), by striking ‘‘$40,000,000’’
10       and inserting ‘‘$60,000,000’’; and
11            (2) in subsection (f), by striking ‘‘$40,000,000’’
12       and inserting ‘‘$60,000,000’’.
13   SEC. 306. CHESAPEAKE BAY ENVIRONMENTAL RESTORA-

14                  TION AND PROTECTION PROGRAM.

15       (a) IN GENERAL.—Section 510 of the Water Resources
16 Development Act of 1996 (Public Law 104–303, 110 Stat.
17 3759; 121 Stat. 1202; 128 Stat. 1317) is amended—
18            (1) by redesignating subsection (h) as subsection
19       (i) and inserting after subsection (g) the following:
20       ‘‘(h) PROJECT CAP.—The total cost of a project carried
21 out under this section may not exceed $15,000,000.’’; and
22            (2) in subsection (i) (as so redesignated), by
23       striking ‘‘$40,000,000’’ and inserting ‘‘$90,000,000’’.
24       (b) OUTREACH AND TRAINING.—The Secretary shall
25 conduct public outreach and workshops for non-Federal in-


      •S 1811 EAH
                              232
 1 terests to provide information on the Chesapeake Bay envi-
 2 ronmental restoration and protection program established
 3 under section 510 of the Water Resources Development Act
 4 of 1996, including how to participate in the program.
 5   SEC. 307. UPPER MISSISSIPPI RIVER SYSTEM ENVIRON-

 6                  MENTAL MANAGEMENT PROGRAM.

 7       Section 1103(e) of the Water Resources Development
 8 Act of 1986 (33 U.S.C. 652(e)) is amended—
 9            (1) in paragraph (3), by striking ‘‘$22,750,000’’
10       and inserting ‘‘$40,000,000’’; and
11            (2) in paragraph (4), by striking ‘‘$10,420,000’’
12       and inserting ‘‘$15,000,000’’.
13   SEC. 308. UPPER MISSISSIPPI RIVER PROTECTION.

14       Section 2010(e) of the Water Resources Reform and
15 Development Act of 2014 (128 Stat. 1270; 132 Stat. 3812)
16 is amended by striking ‘‘the Act of October 15, 1940 (33
17 U.S.C. 701h–1)’’ and inserting ‘‘section 5 of the Act of June
18 22, 1936 (33 U.S.C. 701h)’’.
19   SEC. 309. THEODORE SHIP CHANNEL, MOBILE, ALABAMA.

20       (a) IN GENERAL.—The project for navigation, Theo-
21 dore Ship Channel, Mobile Harbor, Alabama, authorized by
22 section 201 of the Flood Control Act of 1965 (42 U.S.C.
23 1962d–5), is revised to incorporate into the project the 40-
24 foot-deep, 1,320-foot-wide, and approximately 1,468.5-foot-
25 long access channel, extending north from stations 257+25


      •S 1811 EAH
                              233
 1 and 273+25 from the Theodore Channel, that was con-
 2 structed for the former Naval Station Mobile, as a substitute
 3 for the authorized but unconstructed 40-foot-deep, 300-foot-
 4 wide, and 1,200-foot-long anchorage basin in the same loca-
 5 tion, to serve the public terminal that replaced the former
 6 Naval Station Mobile as obligated under the authorizations
 7 for the project.
 8       (b) TREATMENT.—The Secretary shall—
 9            (1) consider construction of the access channel
10       described in subsection (a) to be complete; and
11            (2) assume maintenance of the access channel de-
12       scribed in subsection (a) for so long as the terminal
13       described in subsection (a) remains publicly owned.
14   SEC. 310. MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION

15                  SYSTEM.

16       Any Federal funds, regardless of the account from
17 which the funds were provided, used to carry out construc-
18 tion of the modification to the McClellan-Kerr Arkansas
19 River Navigation System, authorized in section 136 of the
20 Energy and Water Development Appropriations Act, 2004
21 (117 Stat. 1842), shall be considered by the Secretary as
22 initiating construction of the project such that future funds
23 will not require a new investment decision.




      •S 1811 EAH
                                 234
 1   SEC. 311. OUACHITA AND BLACK RIVERS, ARKANSAS AND

 2                  LOUISIANA.

 3       The project for navigation, Ouachita and Black Riv-
 4 ers, Arkansas and Louisiana, authorized by section 101 of
 5 the River and Harbor Act of 1960 (74 Stat. 481), is modi-
 6 fied to include water supply as an authorized purpose.
 7   SEC. 312. LAKE ISABELLA, CALIFORNIA.

 8       (a) SENSE OF CONGRESS.—It is the sense of Congress
 9 that the Secretary, when evaluating alternative locations for
10 construction of a permanent Isabella Lake Visitor Center
11 by the Corps of Engineers to replace the facility impacted
12 by the Isabella Dam safety modification project, should af-
13 ford substantial weight to the site preference of the local
14 community.
15       (b) AUTHORITY.—The Secretary may acquire such in-
16 terests in real property as the Secretary determines nec-
17 essary or advisable to support construction of the Isabella
18 Dam safety modification project.
19       (c) TRANSFER.—The Secretary may transfer any real
20 property interests acquired under subsection (b) to any
21 other Federal agency or department without reimburse-
22 ment.
23       (d) ISABELLA DAM SAFETY MODIFICATION PROJECT
24 DEFINED.—In this section, the term ‘‘Isabella Dam safety
25 modification project’’ means the dam safety modification
26 project at the Isabella Reservoir in the San Joaquin Valley,
      •S 1811 EAH
                                   235
 1 California (authorized by Act of December 22, 1944 (chap-
 2 ter 665, 58 Stat. 901)), including the component of the
 3 project relating to construction a visitor center facility.
 4   SEC. 313. LOWER SAN JOAQUIN RIVER FLOOD CONTROL

 5                     PROJECT.

 6          The Secretary shall align the schedules of, and maxi-
 7 mize complimentary efforts, minimize duplicative practices,
 8 and ensure coordination and information sharing with re-
 9 spect to—
10                  (1) the project for flood risk management, Lower
11          San Joaquin River, authorized by section 1401(2) of
12          the Water Resources Development Act of 2018 (132
13          Stat. 3836); and
14                  (2) the second phase of the feasibility study for
15          the Lower San Joaquin River project for flood risk
16          management, authorized for expedited completion by
17          section 1203(a)(7) of the Water Resources Develop-
18          ment Act 2018 (132 Stat. 3803).
19   SEC.    314.    SACRAMENTO      RIVER,   GLENN-COLUSA,    CALI-

20                     FORNIA.

21          The portion of project for flood control, Sacramento
22 River, California, authorized by section 2 of the Act of
23 March 1, 1917 (chapter 144, 39 Stat. 949; 103 Stat. 649;
24 110 Stat. 3709; 112 Stat. 1841; 113 Stat. 299), consisting
25 of a riverbed gradient restoration facility at the Glenn-


      •S 1811 EAH
                                236
 1 Colusa Irrigation District Intake, is no longer authorized
 2 beginning on the date of enactment of this Act.
 3   SEC. 315. SAN DIEGO RIVER AND MISSION BAY, SAN DIEGO

 4                  COUNTY, CALIFORNIA.

 5         The portion of the project for flood control and naviga-
 6 tion, San Diego River and Mission Bay, San Diego County,
 7 California, authorized by the Act of July 24, 1946 (chapter
 8 595, 60 Stat. 636), identified in the National Levee Data-
 9 base established under section 9004 of the Water Resources
10 Development Act of 2007 (33 U.S.C. 3303) as the San Diego
11 River 3 segment and consisting of a 785-foot-long segment
12 of the right bank levee from Station 209+41.75 to its end
13 at Station 217+26.75, as described in construction plans
14 dated August 30, 1951, is no longer authorized beginning
15 on the date of enactment of this Act.
16   SEC. 316. SAN FRANCISCO, CALIFORNIA, WATERFRONT

17                  AREA.

18         (a) IN GENERAL.—Section 114 of the River and Har-
19 bor Act of 1968 (33 U.S.C. 59h) is amended to read as fol-
20 lows:
21   ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATERFRONT

22                  AREA.

23         ‘‘(a) AREA TO BE DECLARED NONNAVIGABLE.—The
24 following area is declared to be nonnavigable waters of the
25 United States: All of that portion of the City and County


      •S 1811 EAH
                              237
 1 of San Francisco, California, lying shoreward of a line be-
 2 ginning at the intersection of the southerly right of way
 3 line of Earl Street prolongation with the Pierhead United
 4 States Government Pierhead line, the Pierhead line as de-
 5 fined in the State of California Harbor and Navigation
 6 Code Section 1770, as amended in 1961; thence northerly
 7 along said Pierhead line to its intersection with a line par-
 8 allel with and distant 10 feet easterly from, the existing
 9 easterly boundary line of Pier 30–32; thence northerly along
10 said parallel line and its northerly prolongation, to a point
11 of intersection with a line parallel with, and distant 10
12 feet northerly from, the existing northerly boundary of Pier
13 30–32; thence westerly along last said parallel line to its
14 intersection with said Pierhead line; thence northerly along
15 said Pierhead line, to the intersection of the easterly right
16 of way line of Van Ness Avenue, formerly Marlette Street,
17 prolongation to the Pierhead line.
18       ‘‘(b) REQUIREMENT THAT AREA BE IMPROVED.—The
19 declaration of nonnavigability under subsection (a) applies
20 only to those parts of the area described in subsection (a)
21 that are or will be bulkheaded, filled, or otherwise occupied
22 or covered by permanent structures and does not affect the
23 applicability of any Federal statute or regulation that re-
24 lates to filling of navigable waters or to other regulated ac-
25 tivities within the area described in subsection (a), includ-


      •S 1811 EAH
                               238
 1 ing sections 9 and 10 of the Act of March 3, 1899 (33 U.S.C.
 2 401, 403), section 404 of the Federal Water Pollution Con-
 3 trol Act, and the National Environmental Policy Act of
 4 1969.
 5        ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC DIS-
 6   TRICT.—Congress finds and declares that the area described

 7 in subsection (a) contains the seawall, piers, and wharves
 8 that comprise the Embarcadero Historic District listed on
 9 the National Register of Historic Places on May 12, 2006.’’.
10        (b) CONFORMING AMENDMENT.—Section 5052 of the
11 Water Resources Development Act of 2007 (33 U.S.C. 59h–
12 1) is repealed.
13   SEC. 317. WESTERN PACIFIC INTERCEPTOR CANAL, SAC-

14                   RAMENTO RIVER, CALIFORNIA.

15        The portion of the project for flood protection on the
16 Sacramento River, authorized by section 2 of the of March
17 1, 1917 (chapter 144, 39 Stat. 949; 45 Stat. 539; 50 Stat.
18 877; 55 Stat. 647; 80 Stat. 1422), consisting of the portion
19 of the levee from G.P.S. coordinate N2147673.584
20 E6690904.187 to N2147908.413 E6689057.060 associated
21 with the Western Pacific Interceptor Canal, is no longer
22 authorized beginning on the date of the enactment of this
23 Act.




       •S 1811 EAH
                              239
 1   SEC. 318. RIO GRANDE ENVIRONMENTAL MANAGEMENT

 2                  PROGRAM, COLORADO, NEW MEXICO, AND

 3                  TEXAS.

 4       Section 5056(f) of the Water Resources Development
 5 Act of 2007 (Public Law 110–114, 121 Stat. 1213; 128 Stat.
 6 1314) is amended by striking ‘‘2019’’ and inserting ‘‘2029’’.
 7   SEC. 319. NEW LONDON HARBOR WATERFRONT CHANNEL,

 8                  CONNECTICUT.

 9       (a) IN GENERAL.—The portion of the project for navi-
10 gation, New London Harbor, Connecticut, authorized by the
11 first section of the Act of June 13, 1902 (chapter 1079, 32
12 Stat. 333), described in subsection (b) is no longer author-
13 ized beginning on the date of enactment of this Act.
14       (b) AREA DESCRIBED.—The area referred to in sub-
15 section (a) is generally the portion between and around the
16 2 piers at the State Pier in New London, specifically the
17 area—
18            (1)     beginning    at   a   point   N691263.78,
19       E1181259.26;
20            (2) running N 35°01’50.75’’ W about 955.59 feet
21       to a point N692046.26, E1180710.74;
22            (3) running N 54°58’06.78’’ E about 100.00 feet
23       to a point N692103.66, E1180792.62;
24            (4) running S 35°01’50.75’’ E about 989.8 feet
25       to a point N691293.17, E1181360.78; and


      •S 1811 EAH
                                240
 1            (5) running S 73°51’15.45’’ W about 105.69 feet
 2       to the point described in paragraph (1).
 3   SEC. 320. WILMINGTON HARBOR, DELAWARE.

 4       It is the sense of Congress that the Corps of Engineers
 5 should maintain the annual maintenance dredging for Wil-
 6 mington Harbor, Delaware, authorized by the Act of June
 7 3, 1896 (chapter 314, 29 Stat. 207).
 8   SEC. 321. WILMINGTON HARBOR SOUTH DISPOSAL AREA,

 9                  DELAWARE.

10       (a) FINDING.—For the purposes of applying section
11 217(b) of the Water Resources Development Act of 1996 (33
12 U.S.C. 2326a(b)) to the Wilmington Harbor South Disposal
13 Area, Delaware, the Secretary shall find that the standard
14 has been met for the Edgemoor expansion of the Port of
15 Wilmington, Delaware.
16       (b) USE.—Any use of the Wilmington Harbor South
17 Disposal Area permitted by the Secretary under section
18 217(b) for the Edgemoor Expansion of the Port of Wil-
19 mington shall not otherwise reduce the availability of ca-
20 pacity, in dredged material disposal facilities under the ju-
21 risdiction of the Secretary that were constructed before the
22 date of enactment of this Act, for operation and mainte-
23 nance of—
24            (1) the Delaware River Mainstem and Channel
25       Deepening project, Delaware, New Jersey, and Penn-


      •S 1811 EAH
                                  241
 1       sylvania, authorized by section 101(6) of the Water
 2       Resources Development Act of 1992 (106 Stat. 4802);
 3       or
 4            (2) the Delaware River, Philadelphia to the Sea,
 5       project, Delaware, New Jersey, Pennsylvania, author-
 6       ized by the Act of June 25, 1910 (chapter 382, 36
 7       Stat. 637; 46 Stat. 921; 52 Stat. 803; 59 Stat. 14; 68
 8       Stat. 1249; 72 Stat. 297).
 9       (c) FEE.—The Secretary shall impose on the non-Fed-
10 eral interest for the Edgemoor Expansion of the Port of Wil-
11 mington a fee, under section 217(b)(1)(B) of the Water Re-
12 sources     Development        Act   of   1996   (33   U.S.C.
13 2326a(b)(1)(B)), to recover capital, operation, and mainte-
14 nance costs associated with any use by the non-Federal in-
15 terest of capacity in the Wilmington Harbor South Disposal
16 Area permitted by the Secretary under section 217(b) of the
17 Water Resources Development Act of 1996 pursuant to sub-
18 section (a) of this section.
19       (d) AGREEMENT TO PAY.—In accordance with section
20 217(a) of the Water Resources Development Act of 1996 (33
21 U.S.C. 2326a(a)), if, to accommodate the dredged materials
22 from operation and maintenance of the Edgemoor Expan-
23 sion of the Port of Wilmington, the Secretary provides addi-
24 tional capacity at the Wilmington Harbor South Disposal
25 Area, the non-Federal interest for the Edgemoor Expansion


      •S 1811 EAH
                             242
 1 of the Port of Wilmington shall agree to pay, during the
 2 period of construction, all costs associated with the con-
 3 struction of the additional capacity.
 4   SEC. 322. WASHINGTON HARBOR, DISTRICT OF COLUMBIA.

 5       Beginning on the date of enactment of this Act, the
 6 project for navigation, Washington Harbor, District of Co-
 7 lumbia, authorized by the Act of August 30, 1935 (chapter
 8 831, 49 Stat. 1031), is modified to reduce, in part, the au-
 9 thorized dimensions of the project, such that the remaining
10 authorized dimensions are as follows:
11            (1) A 200-foot-wide, 12-foot-deep channel with a
12       center line beginning at a point East 1,317,064.30
13       and North 440,373.32, thence to a point East
14       1,316,474.30 and North 440,028.31, thence to a point
15       East 1,315,584.30 and North 439,388.30, thence to a
16       point East 1,315,259.31 and North 438,908.30.
17            (2) A 200- to 300-foot-wide, 12-foot-deep transi-
18       tion area, with a center line beginning at a point
19       East 1,315,259.31 and North 438,908.30 to a point
20       East 1,315,044.31 and North 438,748.30.
21            (3) A 300-foot-wide, 15-foot-deep channel with a
22       centerline beginning a point East 1,315,044.31 and
23       North 438,748.30, thence to a point East 1,314,105.31
24       and North 438,124.79, thence to a point East
25       1,311,973.30 and North 438,807.78, thence to a point


      •S 1811 EAH
                              243
 1       East 1,311,369.73 and North 438,577.42, thence to a
 2       point East 1,311,015.73 and North 438,197.57, thence
 3       to a point East 1,309,713.47 and North 435,678.91.
 4            (4) A 300- to 400-foot-wide, 15- to 24-foot-deep
 5       transition area, with a center line beginning at a
 6       point East 1,309,713.47 and North 435,678.91 to a
 7       point East 1,307,709.33 and North 434,488.25.
 8            (5) A 400-foot-wide, 24-foot-deep channel with a
 9       centerline beginning at a point East 1,307,709.33 and
10       North 434,488.25, thence to a point East 1,307,459.33
11       and North 434,173.25, thence to a point East
12       1,306,476.82 and North 432,351.28, thence to a point
13       East 1,306,209.79 and North 431,460.21, thence to a
14       point at the end of the channel near Hains Point
15       East 1,305,997.63 and North 429,978.31.
16   SEC. 323. BIG CYPRESS SEMINOLE INDIAN RESERVATION

17                  WATER CONSERVATION PLAN, FLORIDA.

18       (a) IN GENERAL.—The project for ecosystem restora-
19 tion, Big Cypress Seminole Indian Reservation Water Con-
20 servation Plan, Florida, authorized pursuant to section 528
21 of the Water Resources Development Act of 1996 (110 Stat.
22 3767), is no longer authorized beginning on the date of en-
23 actment of this Act.
24       (b) SAVINGS PROVISION.—Nothing in this section af-
25 fects the responsibility of the Secretary to pay any damages


      •S 1811 EAH
                               244
 1 awarded by the Armed Services Board of Contract Appeals,
 2 or by a court of competent jurisdiction, to a contractor re-
 3 lating to the adjudication of claims arising from construc-
 4 tion of the project described in subsection (a).
 5   SEC. 324. CENTRAL EVERGLADES, FLORIDA.

 6        The project for ecosystem restoration, Central Ever-
 7 glades, authorized by section 1401(4) of the Water Resources
 8 Development Act of 2016 (130 Stat. 1713), is modified to
 9 include the project for ecosystem restoration, Central and
10 Southern Florida, Everglades Agricultural Area, authorized
11 by section 1308 of the Water Resources Development Act
12 of 2018 (132 Stat. 3819), and to authorize the Secretary
13 to carry out the project, as so combined, at a total combined
14 cost of $4,362,091,000.
15   SEC. 325. MIAMI RIVER, FLORIDA.

16        The portion of the project for navigation, Miami River,
17 Florida, authorized by the Act of July 3, 1930 (46 Stat.
18 925; 59 Stat. 16; 74 Stat. 481; 100 Stat. 4257), beginning
19 at the existing railroad bascule bridge and extending ap-
20 proximately 1,000 linear feet upstream to an existing salin-
21 ity barrier and flood control structure, is no longer author-
22 ized beginning on the date of enactment of this Act.




       •S 1811 EAH
                               245
 1   SEC. 326. JULIAN KEEN, JR. LOCK AND DAM, MOORE HAVEN,

 2                  FLORIDA.

 3       (a) DESIGNATION.—The Moore Haven Lock and Dam,
 4 Moore Haven, Florida, authorized pursuant to the Act of
 5 July 3, 1930 (chapter 847, 46 Stat. 925; 49 Stat. 1032),
 6 shall be known and designated as the ‘‘Julian Keen, Jr.
 7 Lock and Dam’’.
 8       (b) REFERENCES.—Any reference in a law, map, regu-
 9 lation, document, paper, or other record of the United
10 States to the Lock and Dam referred to in subsection (a)
11 shall be deemed to be a reference to the ‘‘Julian Keen, Jr.
12 Lock and Dam’’.
13   SEC. 327. TAYLOR CREEK RESERVOIR AND LEVEE L–73 (SEC-

14                  TION 1), UPPER ST. JOHNS RIVER BASIN,

15                  FLORIDA.

16       The portions of the project for flood control and other
17 purposes, Central and Southern Florida, authorized by sec-
18 tion 203 of the Flood Control Act of 1948 (62 Stat. 1176),
19 consisting of the Taylor Creek Reservoir and Levee L–73,
20 Section 1, within the Upper St. Johns River Basin, Flor-
21 ida, are no longer authorized beginning on the date of en-
22 actment of this Act.
23   SEC. 328. EXTINGUISHMENT OF FLOWAGE EASEMENTS,

24                  ROUGH RIVER LAKE, KENTUCKY.

25       (a) IN GENERAL.—Subject to the availability of appro-
26 priations and on request of the landowner, the Secretary
      •S 1811 EAH
                              246
 1 shall extinguish any flowage easement or portion of a flow-
 2 age easement held by the United States on developed land
 3 of the landowner at Rough River Lake, Kentucky—
 4            (1) that is above 534 feet mean sea level; and
 5            (2) for which the Secretary determines the flow-
 6       age easement or portion of the flowage easement is not
 7       required to address backwater effects.
 8       (b) NO LIABILITY.—The United States shall not be lia-
 9 ble for any damages to property or injuries to persons from
10 flooding that may be attributable to the operation and
11 maintenance of Rough River Dam, Kentucky, on land that
12 was encumbered by a flowage easement extinguished under
13 subsection (a).
14       (c) AUTHORIZATION OF APPROPRIATIONS.—There is
15 authorized to be appropriated to carry out this section
16 $10,000,000, to remain available until expended.
17   SEC. 329. CALCASIEU RIVER AND PASS, LOUISIANA.

18       Not later than 120 days after the date of enactment
19 of this Act, the Secretary shall provide to the Committee
20 on Transportation and Infrastructure of the House of Rep-
21 resentatives and the Committee on Environment and Public
22 Works of the Senate a report on plans to modify the
23 Calcasieu River and Pass Dredged Material Management
24 Plan and Supplemental Environmental Impact Statement
25 (November 22, 2010 DMMP/SEIS) to allow for the expan-


      •S 1811 EAH
                              247
 1 sion of Dredged Material Placement Facilities (DMPFs) 17,
 2 19, 22, D, and E to the lakeside foreshore rock boundaries
 3 during planned rehabilitation of these facilities.
 4   SEC. 330. CAMDEN HARBOR, MAINE.

 5       (a) IN GENERAL.—The portions of the project for navi-
 6 gation, Camden Harbor, Maine, described in subsection (b)
 7 are no longer authorized beginning on the date of enactment
 8 of this Act.
 9       (b) PORTIONS DESCRIBED.—The portions referred to
10 in subsection (a) are the following:
11            (1) The portion of the 10-foot-deep inner harbor
12       area, authorized by the first section of the Act of
13       March 3, 1873 (chapter 233, 17 Stat. 565; 25 Stat.
14       400), approximately 50,621.75 square feet in area—
15                  (A) starting at a point with coordinates
16            N197,640.07, E837,851.71;
17                  (B) thence running S84°43’ 23.94’’W about
18            381.51   feet   to   a   point   with     coordinates
19            N197,604.98, E837,471.82;
20                  (C) thence running N43°47’ 51.43’’W about
21            270.26   feet   to   a   point   with     coordinates
22            N197,800.05, E837,284.77;
23                  (D) thence running S59°02’ 26.62’’E about
24            219.18   feet   to   a   point   with     coordinates
25            N197,687.30, E837,472.72;


      •S 1811 EAH
                             248
1                  (E) thence running S81°50’ 09.76’’E about
2            144.70   feet   to   a   point   with   coordinates
3            N197,666.75, E837,615.96;
4                  (F) thence running N57°27’ 07.42’’E about
5            317.32   feet   to   a   point   with   coordinates
6            N197,866.52, E837,928.96; and
 7                 (G) thence running S18°50’ 04.48’’W about
 8           239.27 feet to the point described in subpara-
 9           graph (A).
10           (2) The portion of the 14-foot-deep outer harbor
11      area, authorized by the first section of the Act of Au-
12      gust 11, 1888 (25 Stat. 400; 32 Stat. 331), approxi-
13      mately 222,015.94 square feet in area—
14                 (A) starting at a point with coordinates
15           N197,640.07, E837,851.71;
16                 (B) thence running N18°50’ 04.48’’E about
17           239.27   feet   to   a   point   with   coordinates
18           N197,866.53, E837,928.96;
19                 (C) thence running N58°28’ 51.05’’E about
20           308.48   feet   to   a   point   with   coordinates
21           N198,027.79, E838,191.93;
22                 (D) thence running N84°20’ 01.88’’E about
23           370.06   feet   to   a   point   with   coordinates
24           N198,064.33, E838,560.18;




     •S 1811 EAH
                               249
 1                   (E) thence running S05°32’ 03.42’’E about
 2            357.31    feet   to   a   point   with   coordinates
 3            N197,708.68, E838,594.64; and
 4                   (F) thence running S84°43’ 23.94’’W about
 5            746.08 feet to the point described in subpara-
 6            graph (A).
 7   SEC. 331. CAPE PORPOISE HARBOR, MAINE, ANCHORAGE

 8                  AREA DESIGNATION.

 9       (a) IN GENERAL.—The project for navigation, Cape
10 Porpoise Harbor, Maine, authorized by section 101 of the
11 River and Harbor Act of 1948 (62 Stat. 1172), is modified
12 to designate the portion of the project described in sub-
13 section (b) as a 6-foot-deep anchorage.
14       (b) PORTION DESCRIBED.—The portion of the project
15 referred to in subsection (a) is the approximately
16 192,235.63 square foot area consisting of the 100-foot-wide
17 and 6-foot-deep channel located within the inner harbor—
18            (1) starting at a point with coordinates N
19       194,175.13, E 2,882,011.74;
20            (2) thence running N33°46’ 08.14’’W about
21       914.57 feet to a point with coordinates N 194,935.40,
22       E 2,881,503.38;
23            (3) thence running N12°41’ 09.78’’W about
24       1,026.40 feet to a point with coordinates N
25       195,936.74, E 2,881,277.97;


      •S 1811 EAH
                                250
 1            (4) thence running N77°18’ 50.22’’E about
 2       100.00 feet to a point with coordinates N 195,958.70,
 3       E 2,881,375.53;
 4            (5) thence running S12°41’ 09.78’’E about
 5       1,007.79 feet to a point with coordinates N
 6       194,975.52, E 2,881,596.85;
 7            (6) thence running S33°46’ 08.14’’E about
 8       895.96 feet to a point with coordinates N 194,230.72,
 9       E 2,882,094.86; and
10            (7) thence running S56°13’ 51.86’’W about
11       100.00 feet to the point described in paragraph (1).
12   SEC. 332. BALTIMORE, MARYLAND.

13       The Secretary is authorized, in accordance with sec-
14 tion 5 of Act of June 22, 1936 (33 U.S.C. 701h), to accept
15 funds contributed by a non-Federal interest for dredging on
16 irregular cycles of the Baltimore Inner Harbor Approach
17 Channel, Baltimore Harbor and Channels Federal naviga-
18 tion project, authorized by section 101 of the River and
19 Harbor Act of 1958 (72 Stat. 297).
20   SEC. 333. THAD COCHRAN LOCK AND DAM, AMORY, MIS-

21                  SISSIPPI.

22       (a) SENSE OF CONGRESS.—It is the sense of Congress
23 that Thad Cochran, whose selfless determination and tire-
24 less work, while serving as a congressman and United
25 States Senator from Mississippi for 45 years, contributed


      •S 1811 EAH
                               251
 1 greatly to the realization and success of the Tennessee-
 2 Tombigbee Waterway.
 3       (b) DESIGNATION.—The navigation lock known as the
 4 ‘‘Amory Lock’’, located at mile 371 on the Tennessee-
 5 Tombigbee Waterway, Mississippi, and the dam associated
 6 with such lock, shall be known and designated as the ‘‘Thad
 7 Cochran Lock and Dam’’.
 8       (c) REFERENCES.—Any reference in a law, map, regu-
 9 lation, document, paper, or other record of the United
10 States to the lock and dam referred to in subsection (b) shall
11 be deemed to be a reference to the ‘‘Thad Cochran Lock and
12 Dam’’.
13   SEC. 334. MISSOURI RIVER RESERVOIR SEDIMENT MANAGE-

14                  MENT.

15       Section 1179(a) of the Water Resources Development
16 Act of 2016 (130 Stat. 1675; 132 Stat. 3782) is amended—
17            (1) in paragraph (3)—
18                   (A) in subparagraph (B), by inserting
19            ‘‘project purposes, including’’ before ‘‘storage ca-
20            pacity’’; and
21                   (B) in subparagraph (C), by striking ‘‘pre-
22            liminary’’;
23            (2) by redesignating paragraphs (4) through (9)
24       as paragraphs (6) through (11), respectively; and




      •S 1811 EAH
                             252
 1           (4) by inserting after paragraph (3) the fol-
 2      lowing:
 3           ‘‘(4) JUSTIFICATION.—In determining the eco-
 4      nomic justification of a sediment management plan
 5      under paragraph (2), the Secretary shall—
 6                 ‘‘(A) measure and include flooding, erosion,
 7           and accretion damages both upstream and down-
 8           stream of the reservoir that are likely to occur as
 9           a result of sediment management within the res-
10           ervoir compared to the damages that are likely
11           to occur if the sediment management plan is not
12           implemented; and
13                 ‘‘(B) include lifecycle costs and a 100-year
14           period of analysis.
15           ‘‘(5) IMPLEMENTATION.—As part of a sediment
16      management plan under paragraph (2), and in ac-
17      cordance with paragraph (10), the Secretary may
18      carry out sediment removal activities at reservoirs
19      owned and operated by the Secretary in the Upper
20      Missouri River Basin, or at reservoirs for which the
21      Secretary has flood control responsibilities under sec-
22      tion 7 of the Act of December 22, 1944 (33 U.S.C.
23      709), in the Upper Missouri River Basin, in accord-
24      ance with section 602 of the Water Resources Develop-
25      ment Act of 1986 (100 Stat. 4148; 110 Stat. 3758;


     •S 1811 EAH
                               253
 1       113 Stat. 295; 121 Stat. 1076) as if those reservoirs
 2       were listed in subsection (a) of that section.’’.
 3   SEC. 335. PORTSMOUTH, NEW HAMPSHIRE.

 4       The Secretary shall expedite the activities required to
 5 be carried out under section 204 of the Water Resources De-
 6 velopment Act of 1992 (33 U.S.C. 2326) regarding the use
 7 of improvement dredging of the Portsmouth Federal naviga-
 8 tion project in Portsmouth, New Hampshire, carried out
 9 pursuant to section 3 of the Act of August 13, 1946 (33
10 U.S.C. 426g), as a source of clean beach fill material to
11 reinforce the stone revetment at Nantasket Beach, Hull,
12 Massachusetts.
13   SEC. 336. RAHWAY FLOOD RISK MANAGEMENT FEASIBILITY

14                  STUDY, NEW JERSEY.

15       The Secretary shall—
16            (1) nullify the determination of the North Atlan-
17       tic Division of the Corps of Engineers that further ac-
18       tivities to carry out the feasibility study for a project
19       for flood risk management, Rahway, New Jersey, au-
20       thorized by the resolution of the Committee on Trans-
21       portation and Infrastructure of the House of Rep-
22       resentatives adopted on March 24, 1998 (docket num-
23       ber 2548), is not warranted;




      •S 1811 EAH
                               254
 1            (2) identify an acceptable alternative to the
 2       project described in paragraph (1) that could receive
 3       Federal support; and
 4            (3) carry out, and expedite the completion of, a
 5       feasibility study for the acceptable alternative identi-
 6       fied under paragraph (2).
 7   SEC. 337. SAN JUAN-CHAMA PROJECT; ABIQUIU DAM, NEW

 8                  MEXICO.

 9       (a) ABIQUIU RESERVOIR.—Section 5(b) of Public Law
10 97–140 (43 U.S.C. 620a note) is amended by striking ‘‘a
11 total of two hundred thousand acre-feet of’’.
12       (b) WATER STORAGE AT ABIQUIU DAM, NEW MEX-
13   ICO.—Section 1 of Public Law 100–522 (43 U.S.C. 620a

14 note) is amended—
15            (1) by striking ‘‘200,000 acre-feet of’’;
16            (2) by inserting ‘‘and San Juan-Chama project’’
17       after ‘‘Rio Grande system’’; and
18            (3) by striking ‘‘, in lieu of the water storage au-
19       thorized by section 5 of Public Law 97–140, to the ex-
20       tent that contracting entities under section 5 of Pub-
21       lic Law 97–140 no longer require such storage’’.
22       (c) WATER STORAGE.—The Secretary shall—
23            (1) store up to elevation 6230.00 NGVD29 at
24       Abiquiu Dam, New Mexico, to the extent that the nec-




      •S 1811 EAH
                             255
 1      essary real property interests have been acquired by
 2      any entity requesting such storage; and
 3           (2) amend the March 20, 1986, contract between
 4      the United States of America and the Albuquerque
 5      Bernalillo County Water Utility Authority (assigned
 6      by the City of Albuquerque, New Mexico to the Albu-
 7      querque Bernalillo County Water Utility Authority)
 8      for water storage space in Abiquiu Reservoir to allow
 9      for storage by the Albuquerque Bernalillo County
10      Water Utility Authority of San Juan-Chama project
11      water or native Rio Grande system water up to ele-
12      vation 6230.00 NGVD29.
13      (d) STORAGE AGREEMENTS WITH USERS OTHER
14 THAN THE ALBUQUERQUE BERNALILLO COUNTY WATER
15 UTILITY AUTHORITY.—The Secretary shall—
16           (1) retain or enter into new agreements with en-
17      tities for a proportionate allocation of 29,100 acre-feet
18      of storage space pursuant to section 5 of Public Law
19      97–140; and
20           (2) amend or enter into new storage agreements
21      for storage of San Juan-Chama project water or na-
22      tive Rio Grande system water up to the space allo-
23      cated for each entity’s proportionate share of San
24      Juan-Chama water.




     •S 1811 EAH
                              256
 1       (e) OPERATIONS DOCUMENTS.—The Secretary shall
 2 amend or revise any existing operations documents, includ-
 3 ing the Water Control Manual or operations plan for
 4 Abiquiu Reservoir, as necessary to meet the requirements
 5 of this section.
 6       (f) LIMITATIONS.—In carrying out this section, the fol-
 7 lowing limitations shall apply:
 8            (1) The storage of native Rio Grande system
 9       water shall be subject to the provisions of the Rio
10       Grande Compact and the resolutions of the Rio
11       Grande Compact Commission.
12            (2) The storage of native Rio Grande system
13       water shall only be authorized to the extent that the
14       necessary water ownership and storage rights have
15       been acquired by the entity requesting such storage.
16            (3) The storage of native Rio Grande system
17       water or San-Juan Chama project water shall not
18       interfere with the authorized purposes of the Abiquiu
19       Dam and Reservoir project.
20            (4) Each user of storage space, regardless of
21       source of water, shall pay for any increase in costs at-
22       tributable to storage of that user’s water.




      •S 1811 EAH
                               257
 1   SEC. 338. FLUSHING BAY AND CREEK FEDERAL NAVIGATION

 2                  CHANNEL, NEW YORK.

 3       (a) IN GENERAL.—The portion of the project for navi-
 4 gation, Flushing Bay and Creek, New York, authorized by
 5 the first section of the Act of March 3, 1905 (chapter 1482,
 6 33 Stat. 1120; 52 Stat. 803; 76 Stat. 1174), described in
 7 subsection (b) is no longer authorized beginning on the date
 8 of enactment of this Act.
 9       (b) PORTION DESCRIBED.—The portion referred to in
10 subsection (a) is the portion from river mile 2.5 to river
11 mile 2.9, as bounded by—
12            (1) the coordinates of—
13                   (A) Latitude North 40° 45’ 45.61’’ Lon-
14            gitude West 73° 50’ 20.19’’;
15                   (B) Latitude North 40° 45’ 47.02’’ Lon-
16            gitude West 73° 50’ 10.80’’;
17                   (C) Latitude North 40° 45’ 26.71’’ Lon-
18            gitude West 73° 50’ 10.85’’; and
19                   (D) Latitude North 40° 45’ 26.72’’ Lon-
20            gitude West 73° 50’ 10.96’’; and
21            (2) the New York Long Island State Plane (US
22       Survey Feet, NAD–83), as follows:
23                   (A)   Easting   x1028866.501     Northing
24            y217179.294;
25                   (B)   Easting   x1029588.853     Northing
26            y217322.675;
      •S 1811 EAH
                              258
 1                   (C)   Easting   x1029588.853    Northing
 2            y215267.486; and
 3                   (D)   Easting   x1028964.587    Northing
 4            y215267.486.
 5   SEC. 339. RUSH RIVER AND LOWER BRANCH RUSH RIVER,

 6                  NORTH DAKOTA.

 7       (a) IN GENERAL.—The portion of the comprehensive
 8 plan for flood control and other purposes in the Red River
 9 of the North drainage basin, North Dakota, South Dakota,
10 and Minnesota, authorized by section 203 of the Flood Con-
11 trol Act of 1948 (62 Stat. 1177; 64 Stat. 176), consisting
12 of clearing and rectification of the channel from mile 28.3
13 near Amenia to the mouth of the Rush River, known as
14 Cass County Drain No. 12, is no longer authorized begin-
15 ning on the date of enactment of this Act.
16       (b) LOWER BRANCH RUSH RIVER.—The project for
17 flood control, Lower Branch Rush River, North Dakota,
18 carried out under section 205 of the Flood Control Act of
19 1948 (33 U.S.C. 701s), known as Cass County Drain No.
20 2, is no longer authorized beginning on the date of enact-
21 ment of this Act.




      •S 1811 EAH
                              259
 1   SEC. 340. PAWCATUCK RIVER, LITTLE NARRAGANSETT BAY

 2                  AND WATCH HILL COVE, RHODE ISLAND AND

 3                  CONNECTICUT.

 4       Beginning on the date of enactment of this Act, that
 5 portion of the project for navigation, Pawcatuck River, Lit-
 6 tle Narragansett Bay and Watch Hill Cove, Rhode Island
 7 and Connecticut, authorized by section 2 of the Act of
 8 March 2, 1945 (chapter 19, 59 Stat. 13), consisting of a
 9 10-foot-deep, 16-acre anchorage area in Watch Hill Cove
10 is no longer authorized.
11   SEC. 341. HARRIS COUNTY, TEXAS.

12       Section 575 of the Water Resources Development Act
13 of 1996 (110 Stat. 3789; 113 Stat. 311; 121 Stat. 1253)
14 is repealed.
15   SEC. 342. CAP SANTE WATERWAY, WASHINGTON.

16       Beginning on the date of enactment of this Act, the
17 project for navigation, Cap Sante Waterway and Naviga-
18 tion Channel, Skagit County, Washington, authorized by
19 the Act of March 2, 1919 (chapter 95, 40 Stat. 1285), is
20 modified to deauthorize the portion of the project consisting
21 of an approximately 334,434-foot area of the Federal chan-
22 nel within Anacortes Harbor inside and directly adjacent
23 to the Federal breakwater and training wall structure,
24 starting at a point with coordinates N557015.552,
25 E1210819.619, thence running S88 13’2.06’’E approxi-
26 mately 200 feet to a point with coordinates N557009.330,
      •S 1811 EAH
                              260
 1 E1211019.522, thence running S01 46’58.08’’W approxi-
 2 mately 578 feet to a point with coordinates N556431.405,
 3 E1211001.534, thence running S49 49’50.23’’W approxi-
 4 mately 69 feet to a point with coordinates N556387.076,
 5 E1210949.002, thence running S51 53’0.25’’E approxi-
 6 mately 35 feet to a point with coordinates N556365.662,
 7 E1210976.316, thence running S49 38’58.48’’W approxi-
 8 mately 112 feet to a point with coordinates N556292.989,
 9 E1210890.775, thence running N88 13’1.87’’W approxi-
10 mately 109 feet to a point with coordinates N556296.367,
11 E1210782.226, thence running S46 46’58.97’’W approxi-
12 mately 141 feet to a point with coordinates N556199.527,
13 E1210679.164, thence running N88 13’1.77’’W approxi-
14 mately 700 feet to a point with coordinates N556221.305,
15 E1209979.502, thence running N01 46’58.08’’E approxi-
16 mately 250 feet to a point with coordinates N556471.184,
17 E1209987.280, thence running S88 13’1.77’’E approxi-
18 mately 815 feet to a point with coordinates N556445.828,
19 E1210801.886, thence running N01 46’58.08’’E approxi-
20 mately 570 feet to the point of origin.
21   SEC. 343. LOCAL GOVERNMENT RESERVOIR PERMIT RE-

22                  VIEW.

23       Section 1119(b) of the Water Resources Development
24 Act of 2018 (33 U.S.C. 2347 note) is amended by striking
25 ‘‘owned or operated by the Secretary’’.


      •S 1811 EAH
                             261
 1   SEC. 344. PROJECT MODIFICATIONS FOR IMPROVEMENT OF

 2                  ENVIRONMENT.

 3       Section 1203(g) of the Water Resources Development
 4 Act of 2018 (132 Stat. 3805) is amended, in the matter
 5 preceding paragraph (1), by striking ‘‘For fiscal years 2019
 6 and 2020’’ and inserting ‘‘Until September 30, 2024’’.
 7   SEC. 345. AQUATIC ECOSYSTEM RESTORATION.

 8       For fiscal years 2021 through 2024, in carrying out
 9 section 206 of the Water Resources Development Act of 1996
10 (33 U.S.C. 2330), the Secretary shall give priority to a
11 project to restore and protect an aquatic ecosystem or estu-
12 ary that—
13            (1) is located in the South Platte River Basin;
14            (2) is located on a body of water that is identi-
15       fied by the applicable State pursuant to section
16       303(d) of the Federal Water Pollution Control Act (33
17       U.S.C. 1313(d)) as being impaired;
18            (3) has the potential to provide flood risk man-
19       agement and recreational benefits in addition to eco-
20       system restoration benefits; and
21            (4) is located in a city with a population of
22       80,000 or less.




      •S 1811 EAH
                                 262
 1   SEC. 346. SURPLUS WATER CONTRACTS AND WATER STOR-

 2                  AGE AGREEMENTS.

 3       Section 1046(c)(3) of the Water Resources Reform and
 4 Development Act of 2014 (128 Stat. 1254; 132 Stat. 3784)
 5 is amended by striking ‘‘12’’ and inserting ‘‘16’’.
 6   SEC. 347. NO WAKE ZONES IN NAVIGATION CHANNELS.

 7       Section 1149 of the Water Resources Development Act
 8 of 2016 (33 U.S.C. 1223 note) amended—
 9               (1) by striking ‘‘recreational’’ in each place it
10       appears and inserting ‘‘covered’’; and
11               (2) by amending subsection (c) to read as fol-
12       lows:
13       ‘‘(c) DEFINITIONS.—In this section:
14               ‘‘(1) COVERED NAVIGATION CHANNEL.—The term
15       ‘covered navigation channel’ means a navigation
16       channel that—
17                   ‘‘(A) is federally marked or maintained;
18                   ‘‘(B) is part of the Atlantic Intracoastal
19               Waterway; and
20                   ‘‘(C) is adjacent to a marina.
21               ‘‘(2) COVERED VESSEL.—The term ‘covered ves-
22       sel’ means a recreational vessel or an uninspected
23       passenger vessel, as such terms are defined in section
24       2101 of title 46, United States Code.’’.




      •S 1811 EAH
                               263
 1   SEC. 348. LIMITATION ON CONTRACT EXECUTION IN THE

 2                  ARKANSAS RIVER BASIN.

 3       (a) DEFINITION OF COVERED CONTRACT.—In this sec-
 4 tion, the term ‘‘covered contract’’ means a contract between
 5 any local governmental entity and the Secretary for water
 6 supply storage in a Federal or non-Federal hydropower lake
 7 within the Arkansas River Basin.
 8       (b) LIMITATION.—For any new covered contract for a
 9 hydropower lake that is entered into during the period be-
10 ginning on the date of enactment of this Act and ending
11 on December 31, 2022, a local governmental entity shall
12 not pay more than 110 percent of the initial principal cost
13 for the acre-feet being sought for the new covered contract
14 for that hydropower lake.
15   SEC. 349. WAIVER OF NON-FEDERAL SHARE OF DAMAGES

16                  RELATED TO CERTAIN CONTRACT CLAIMS.

17       In a case in which the Armed Services Board of Con-
18 tract Appeals or other court of competent jurisdiction has
19 rendered a decision during the period beginning on Decem-
20 ber 1, 2017, and ending on December 31, 2022, awarding
21 damages to a contractor relating to the adjudication of
22 claims arising from the construction of an authorized water
23 resources development project, notwithstanding the terms of
24 the Project Partnership Agreement, the Secretary shall
25 waive payment of the share of the non-Federal interest of
26 those damages, including attorney’s fees, if—
      •S 1811 EAH
                                264
 1            (1)(A) the contracting officer was instructed by
 2       the Corps of Engineers to modify the terms of the con-
 3       tract or terminate the contract; and
 4            (B) the Armed Services Board of Contract Ap-
 5       peals or other court of competent jurisdiction deter-
 6       mined that the failure of the contracting officer to
 7       timely take the action described in subparagraph (A)
 8       was a material breach of the contract that resulted in
 9       damages to the contractor awarded by the Armed
10       Services Board of Contract Appeals or the court, as
11       applicable; or
12            (2) the claims arose from construction of a
13       project deauthorized under this title.
14   SEC. 350. REDUCED PRICING FOR CERTAIN WATER SUPPLY

15                  STORAGE.

16       Section 322 of the Water Resources Development Act
17 of 1990 (33 U.S.C. 2324) is amended—
18            (1) in subsection (b), by striking ‘‘2,000,000’’
19       and inserting ‘‘3,000,000’’; and
20            (2) in subsection (g)—
21                   (A) by striking the period at the end and
22            inserting ‘‘; or’’;
23                   (B) by striking ‘‘means a community’’ and
24            inserting the following: ‘‘means—
25            ‘‘(1) a community’’; and


      •S 1811 EAH
                                265
1                   (C) by adding at the end the following:
2             ‘‘(2) a regional water system that serves a popu-
3        lation of less than 100,000, for which the per capita
4        income is less than the per capita income of not less
5        than 50 percent of the counties in the United States.’’.
 6   SEC. 351. FLOOD CONTROL AND OTHER PURPOSES.

 7       Section 103(k) of the Water Resources Development Act
 8 of 1986 (33 U.S.C. 2213) is amended—
 9            (1) by striking ‘‘Except as’’ and inserting the fol-
10       lowing:
11            ‘‘(1) IN GENERAL.—Except as’’; and
12            (2) by adding at the end the following:
13            ‘‘(2) RENEGOTIATION OF TERMS.—
14                  ‘‘(A) IN GENERAL.—At the request of a non-
15            Federal interest, the Secretary and the non-Fed-
16            eral interest may renegotiate the terms and con-
17            ditions of an eligible deferred payment, includ-
18            ing—
19                      ‘‘(i) permitting the non-Federal con-
20                  tribution to be made without interest, pur-
21                  suant to paragraph (1);
22                      ‘‘(ii) recalculation of the interest rate;
23                      ‘‘(iii) full or partial forgiveness of in-
24                  terest accrued during the period of construc-
25                  tion; and


      •S 1811 EAH
                              266
 1                      ‘‘(iv) a credit against construction in-
 2                 terest for a non-Federal investment that
 3                 benefits the completion or performance of
 4                 the project or separable element.
 5                 ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An
 6           eligible deferred payment agreement under sub-
 7           paragraph (A) is an agreement for which—
 8                      ‘‘(i) the non-Federal contribution was
 9                 made with interest;
10                      ‘‘(ii) the period of project construction
11                 exceeds 10 years from the execution of a
12                 project partnership agreement or appro-
13                 priation of funds; and
14                      ‘‘(iii) the construction interest exceeds
15                 $45,000,000.
16           ‘‘(3) CREDIT     FOR    NON-FEDERAL       CONTRIBU-

17      TION.—

18                 ‘‘(A) IN GENERAL.—The Secretary is au-
19           thorized to credit any costs incurred by the non-
20           Federal interest (including in-kind contribu-
21           tions) to remedy a design or construction defi-
22           ciency of a covered project or separable element
23           toward the non-Federal share of the cost of the
24           covered project, if the Secretary determines the




     •S 1811 EAH
                             267
 1           remedy to be integral to the completion or per-
 2           formance of the covered project.
 3                 ‘‘(B) CREDIT OF COSTS.—If the non-Federal
 4           interest incurs costs or in-kind contributions for
 5           a project to remedy a design or construction defi-
 6           ciency of a project or separable element which
 7           has a 100 percent Federal cost share, and the
 8           Secretary determines the remedy to be integral to
 9           the completion or performance of the project, the
10           Secretary is authorized to credit such costs to
11           any interest accrued on a deferred non-Federal
12           contribution.
13           ‘‘(4) TREATMENT OF PRE-PAYMENT.—Notwith-
14      standing a deferred payment agreement with a non-
15      Federal interest, the Secretary shall accept, without
16      interest of any type, the repayment of a non-Federal
17      contribution for any eligible deferred payment de-
18      scribed in paragraph (2)(B) for which—
19                 ‘‘(A) the non-Federal interest makes a pay-
20           ment of at least $200 million for that eligible de-
21           ferred payment agreement on or before Sep-
22           tember 30, 2021; and
23                 ‘‘(B) the non-Federal interest repays the re-
24           maining principal by September 30, 2023.’’.




     •S 1811 EAH
                                   268
 1   SEC.     352.     ADDITIONAL    ASSISTANCE       FOR   CRITICAL

 2                     PROJECTS.

 3          (a) CONSISTENCY WITH REPORTS.—Congress finds
 4 that the project modifications described in this section are
 5 in accordance with the reports submitted to Congress by the
 6 Secretary under section 7001 of the Water Resources Reform
 7 and Development Act of 2014 (33 U.S.C. 2282d), titled ‘‘Re-
 8 port to Congress on Future Water Resources Development’’,
 9 or have otherwise been reviewed by Congress.
10          (b) MODIFICATIONS.—
11               (1) SACRAMENTO          AREA, CALIFORNIA.—Section

12          219(f)(23) of the Water Resources Development Act of
13          1992 (106 Stat. 4835; 113 Stat. 336; 117 Stat. 1840)
14          is amended to read as follows:
15               ‘‘(23)    SACRAMENTO         AREA,   CALIFORNIA.—

16          $45,000,000 for regional water conservation, recy-
17          cling, reliability, and resiliency projects in Placer, El
18          Dorado, and Sacramento Counties and the San Juan
19          Suburban Water District, California.’’.
20               (2)      SOUTH     PERRIS,    CALIFORNIA.—Section

21          219(f)(52) of the Water Resources Development Act of
22          1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.
23          2763A–220) is amended by striking ‘‘$25,000,000’’
24          and inserting ‘‘$50,000,000’’.
25               (3) MADISON AND ST. CLAIR COUNTIES, ILLI-
26          NOIS.—Section 219(f)(55) of the Water Resources De-

      •S 1811 EAH
                               269
 1      velopment Act of 1992 (106 Stat. 4835; 113 Stat. 335;
 2      114 Stat. 2763A–221) is amended by striking
 3      ‘‘$10,000,000’’ and inserting ‘‘$45,000,000’’.
 4           (4) SOUTHERN AND EASTERN KENTUCKY.—Sec-
 5      tion 531 of the Water Resources Development Act of
 6      1996 (110 Stat. 3773; 113 Stat. 348; 117 Stat. 142;
 7      121 Stat. 1226) is amended—
 8                 (A) in subsection (g), by inserting ‘‘Boyd,
 9           Carter, Elliott, Lincoln,’’ after ‘‘Lee,’’; and
10                 (B)    in   subsection     (h),   by   striking
11           ‘‘$40,000,000’’ and inserting ‘‘$100,000,000’’.
12           (5)   DESOTO      COUNTY,      MISSISSIPPI.—Section

13      219(f)(30) of the Water Resources Development Act of
14      1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.
15      2763A–220; 119 Stat. 282; 119 Stat. 2257; 122 Stat.
16      1623) is amended by striking ‘‘$75,000,000’’ and in-
17      serting ‘‘$130,000,000’’.
18           (6) JACKSON COUNTY, MISSISSIPPI.—Section 219
19      of the Water Resources Development Act of 1992 (106
20      Stat. 4835; 110 Stat. 3757; 113 Stat. 1494; 121 Stat.
21      1258) is amended—
22                 (A) in subsection (c)(5), by striking ‘‘water
23           supply and’’ and inserting ‘‘water supply,
24           projects for stormwater and drainage systems,
25           and’’; and


     •S 1811 EAH
                                 270
1                   (B)    in    subsection      (e)(1),   by    striking
2             ‘‘$32,500,000’’ and inserting ‘‘$57,500,000’’.
 3            (7) ST. LOUIS, MISSOURI.—Section 219(f)(32) of
 4      the Water Resources Development Act of 1992 (106
 5      Stat. 4835; 113 Stat. 337; 121 Stat. 1233) is amend-
 6      ed    by    striking      ‘‘$35,000,000’’      and      inserting
 7      ‘‘$70,000,000’’.
 8            (8)    MIDWEST           CITY,     OKLAHOMA.—Section

 9      219(f)(231) of the Water Resources Development Act
10      of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat.
11      1266) is amended by striking ‘‘$2,000,000’’ and in-
12      serting ‘‘$5,000,000’’.
13            (9) SOUTH         CENTRAL    PENNSYLVANIA.—Section

14      313 of the Water Resources Development Act of 1992
15      (106 Stat. 4845; 109 Stat. 407; 110 Stat. 3723; 113
16      Stat. 310; 117 Stat. 142; 121 Stat. 1146) is amend-
17      ed—
18                  (A)    in    subsection    (g)(1),     by    striking
19            ‘‘$200,000,000’’ and inserting ‘‘$400,000,000’’;
20            and
21                  (B) in subsection (h)(2), by inserting ‘‘Bea-
22            ver, Jefferson,’’ after ‘‘Washington,’’.
23            (10) LAKES        MARION     AND     MOULTRIE,      SOUTH

24      CAROLINA.—Section 219(f)(25) of the Water Resources

25      Development Act of 1992 (106 Stat. 4835; 113 Stat.


     •S 1811 EAH
                              271
 1      336; 114 Stat. 2763A–220; 117 Stat. 1838; 130 Stat.
 2      1677; 132 Stat. 3818) is amended by striking
 3      ‘‘$89,550,000’’ and inserting ‘‘$110,000,000’’.
 4           (11)     EL    PASO    COUNTY,        TEXAS.—Section

 5      219(f)(269) of the Water Resources Development Act
 6      of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat.
 7      1268) is amended by striking ‘‘$25,000,000’’ and in-
 8      serting ‘‘$75,000,000’’.
9            (12) WESTERN RURAL WATER.—Section 595 of
10      the Water Resources Development Act of 1999 (113
11      Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat.
12      1836; 118 Stat. 440; 121 Stat. 1219; 123 Stat. 2851;
13      128 Stat. 1316; 130 Stat. 1681) is amended—
14                  (A) by striking the section heading and in-
15           serting ‘‘WESTERN RURAL WATER.’’;
16                  (B) in subsection (b), by inserting ‘‘Ari-
17           zona,’’ before ‘‘rural Idaho’’;
18                  (C) in subsection (c), by inserting ‘‘Ari-
19           zona,’’ before ‘‘Idaho’’; and
20                  (D) in subsection (i), by striking ‘‘for the
21           period     beginning   with       fiscal   year   2001,
22           $435,000,000, to remain available until ex-
23           pended.’’ and inserting the following: ‘‘, to re-
24           main available until expended—




     •S 1811 EAH
                               272
 1             ‘‘(1) for the period beginning with fiscal year
 2       2001, $435,000,000 for Idaho, Montana, rural Ne-
 3       vada, New Mexico, rural Utah, and Wyoming; and
 4             ‘‘(2) $150,000,000 for Arizona.’’.
 5             (13) CENTRAL WEST VIRGINIA.—Section 571(h)
 6       of the Water Resources Development Act of 1999 (113
 7       Stat. 371; 121 Stat. 1257) is amended by striking
 8       ‘‘$20,000,000’’ and inserting ‘‘$100,000,000’’.
 9             (14) SOUTHERN WEST VIRGINIA.—Section 340(g)
10       of the Water Resources Development Act of 1992 (106
11       Stat. 4856; 110 Stat. 3727; 113 Stat. 320) is amend-
12       ed    by   striking    ‘‘$40,000,000’’     and    inserting
13       ‘‘$120,000,000’’.
14       (c) LOWELL CREEK TUNNEL, SEWARD, ALASKA.—Sec-
15 tion 5032(a)(2) of the Water Resources Development Act of
16 2007 (Public Law 110–114, 121 Stat. 1205) is amended
17 by striking ‘‘15’’ and inserting ‘‘20’’.
18       (d) CAPE ARUNDEL DISPOSAL SITE, MAINE.—Section
19 1312 of the Water Resources Development Act of 2018 (132
20 Stat. 3821) is amended by striking ‘‘December 31, 2021’’
21 and inserting ‘‘September 30, 2024’’.
22   SEC. 353. PROJECT MODIFICATION AUTHORIZATIONS.

23       (a) WATER SUPPLY.—The following project modifica-
24 tions for water supply, as identified in the report entitled
25 ‘‘Report to Congress on Future Water Resources Develop-


      •S 1811 EAH
                             273
1 ment’’ dated February 2019, and submitted to Congress on
2 June 3, 2019, pursuant to section 7001 of the Water Re-
3 sources Reform and Development Act of 2014 (33 U.S.C.
4 2282d) or otherwise reviewed by Congress, are authorized
5 to be carried out by the Secretary substantially in accord-
6 ance with the recommendations included in such report
7 pursuant to section 301(c) of the Water Supply Act of 1958
8 (43 U.S.C. 390b(c)) and as follows:
 9           (1) CLARENCE CANNON DAM AND MARK TWAIN
10      LAKE PROJECT, SALT RIVER, MISSOURI.—

11                 (A) IN GENERAL.—The project for Clarence
12           Cannon Dam and Mark Twain Lake Project,
13           Salt River, Missouri, authorized by section 203
14           of the Flood Control Act of 1962 (76 Stat. 1189;
15           79 Stat. 1089; 95 Stat. 1684), is modified to re-
16           lease 5,600 acre-feet of future use water supply
17           storage to the Federal Government under water
18           supply contract No. DACW43–88–C–0036, and
19           future financial obligations for such volume of
20           storage.
21                 (B) RELIEF OF CERTAIN OBLIGATIONS.—
22           Upon execution of the amendment required by
23           subparagraph (C), the State of Missouri shall be
24           relieved of the obligation to pay the percentage of
25           the annual operation and maintenance expense,


     •S 1811 EAH
                              274
 1           the percentage of major replacement cost, and the
 2           percentage of major rehabilitation costs, of the
 3           joint use facilities of the project described in sub-
 4           paragraph (A), that are attributable to water
 5           supply storage space not being used by the State
 6           during the period before the State commences use
 7           of the storage space.
 8                 (C) AMENDMENT TO CONTRACT.—The Sec-
 9           retary shall amend Water Supply Contract No.
10           DACW43–88–C–0036, dated March 10, 1988, be-
11           tween the United States and the State of Mis-
12           souri, to implement the modifications required
13           under subparagraphs (A) and (B).
14           (2) CITY OF PLATTSBURG.—
15                 (A) IN GENERAL.—The project for Smith-
16           ville Lake, Missouri, authorized pursuant to sec-
17           tion 204 of the Flood Control Act of 1965 (79
18           Stat. 1080), is modified to release the City of
19           Plattsburg, Missouri, from—
20                      (i) 8,850 acre-feet of future water sup-
21                 ply storage contracts; and
22                      (ii) future financial obligations for the
23                 volume of storage described in clause (i).
24                 (B) AMENDMENT TO CONTRACT.—The Sec-
25           retary shall amend water supply contract No.


     •S 1811 EAH
                               275
 1            DACW41–73–C–0008, between the United States
 2            and the State of Missouri, to implement the
 3            modifications under subparagraph (A).
 4            (3) CITY OF SMITHVILLE.—
 5                  (A) IN GENERAL.—The project for Smith-
 6            ville Lake, Missouri, authorized pursuant to sec-
 7            tion 204 of the Flood Control Act of 1965 (79
 8            Stat. 1080), is modified to release the City of
 9            Smithville, Missouri, from—
10                       (i) 6,000 acre-feet of future water sup-
11                  ply storage contracts; and
12                       (ii) future financial obligations for the
13                  volume of storage described in clause (i).
14                  (B) AMENDMENT TO CONTRACT.—The Sec-
15            retary shall amend water supply contract No.
16            DACW–41–73–C–0007,          between    the   United
17            States and the State of Missouri, to implement
18            the modifications under subparagraph (A).
19       (b) FLOOD RISK MANAGEMENT.—The following project
20 modifications for flood risk management, as identified in
21 a report entitled ‘‘Report to Congress on Future Water Re-
22 sources Development’’, and submitted to Congress pursuant
23 to section 7001 of the Water Resources Reform and Develop-
24 ment Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed




      •S 1811 EAH
                                276
 1 by Congress, are authorized to be carried out by the Sec-
 2 retary:
 3            (1) Modification of the project for flood risk
 4       management, lower Mississippi River, authorized by
 5       the Act of May 15, 1928 (chapter 569, 45 Stat. 534),
 6       to incorporate the Wolf River Backwater and
 7       Nonconnah Creek levee systems into the project, au-
 8       thorized by section 5 of the Act of June 22, 1936
 9       (chapter 688, 49 Stat. 1575; 50 Stat. 881), subject to
10       the determination of the Secretary that such systems
11       meet all requirements applicable to such project.
12            (2) Modification of the project for flood risk
13       management, Red River below Denison Dam, Arkan-
14       sas, Louisiana, and Texas, authorized by the Act of
15       June 28, 1938 (chapter 795, 52 Stat. 1219), to incor-
16       porate the Cherokee Park Levee into the project, sub-
17       ject to the determination of the Secretary that such
18       levee meets all requirements applicable to such
19       project.
20   SEC. 354. COMPLETION OF MAINTENANCE AND REPAIR AC-

21                  TIVITIES.

22       (a) EXPEDITED COMPLETIONS.—
23            (1) UPPER SNAKE RIVER BASIN.—The Secretary
24       shall expedite, in coordination with State, Tribal,
25       and local authorities, the completion of maintenance


      •S 1811 EAH
                            277
1       and repair activities for those elements of the levee
2       systems in the Upper Snake River Basin, authorized
3       pursuant to the Flood Control Act of 1950 (64 Stat.
4       179), that are operated and maintained by the Sec-
5       retary.
 6           (2) LOWER MISSOURI RIVER BASIN.—The Sec-
 7      retary shall expedite, in coordination with State and
 8      local authorities and stakeholders, the completion of
 9      maintenance and repair activities for those elements
10      of the levee systems in the Lower Missouri River
11      Basin, authorized pursuant to the Pick-Sloan Mis-
12      souri River Basin Program (authorized by section
13      9(b) of the Act of December 22, 1944 (chapter 665, 58
14      Stat. 891)) or the Missouri River Bank Stabilization
15      and Navigation project (authorized by section 2 of the
16      Act of March 2, 1945 (chapter 19, 59 Stat. 19)), that
17      are operated and maintained by the Secretary.
18           (3) COOS BAY NORTH JETTY SYSTEM, OREGON.—
19      The Secretary shall expedite, in coordination with
20      State and local authorities and stakeholders, the com-
21      pletion of maintenance and repair activities for those
22      elements of the Coos Bay North Jetty system, Oregon,
23      authorized by the first section of the Act of January
24      21, 1927 (chapter 47, 44 Stat. 1014), that are oper-
25      ated and maintained by the Secretary.


     •S 1811 EAH
                               278
 1            (4) INDIAN RIVER INLET AND BAY, DELAWARE.—
 2       The Secretary shall expedite, in coordination with
 3       State and local authorities, the completion of mainte-
 4       nance and repair activities for the elements of the
 5       project for navigation, Indian River Inlet and Bay,
 6       Delaware, authorized by the Act of August 26, 1937
 7       (chapter 832, 50 Stat. 846), that are operated and
 8       maintained by the Secretary.
 9       (b) SAVINGS PROVISION.—Nothing in this section af-
10 fects the responsibility of the Secretary to comply with the
11 requirements of any Federal law in carrying out the activi-
12 ties required to be expedited by this section.
13   SEC. 355. PROJECT REAUTHORIZATIONS.

14       (a) IN GENERAL.—
15            (1) MUDDY RIVER, MASSACHUSETTS.—The sepa-
16       rable elements for ecosystem restoration of the project
17       for flood damage reduction and environmental res-
18       toration, Muddy River, Brookline and Boston, Massa-
19       chusetts, authorized by section 522 of the Water Re-
20       sources Development Act of 2000 (114 Stat. 2656),
21       and deauthorized pursuant to section 6001 of the
22       Water Resources Reform and Development Act of
23       2014 (128 Stat. 1345), are authorized to be carried
24       out by the Secretary, subject to subsection (b).




      •S 1811 EAH
                             279
 1             (2) EAST CHESTER CREEK, NEW YORK.—Not-
 2      withstanding section 1001 of the Water Resources De-
 3      velopment Act of 1986 (33 U.S.C. 579a), the project
 4      for navigation, East Chester Creek, New York, author-
 5      ized by section 101 of the River and Harbor Act of
 6      1950 (64 Stat. 164; 100 Stat. 4181), and deauthor-
 7      ized pursuant to section 1001 of the Water Resources
 8      Development Act of 1986 (33 U.S.C. 579(a)), is au-
 9      thorized to be carried out by the Secretary, subject to
10      subsection (b).
11             (3) CHRISTIANSTED HARBOR, UNITED STATES
12      VIRGIN ISLANDS.—Notwithstanding        section 1002 of
13      the Water Resources Development Act of 1986 (100
14      Stat. 4221), the portion of the project for navigation,
15      Christiansted Harbor, St. Croix, United States Virgin
16      Islands, authorized by section 101 of the River and
17      Harbor Act of 1950 (64 Stat. 167), and deauthorized
18      under section 1002 of the Water Resources Develop-
19      ment Act of 1986 (100 Stat. 4221), is authorized to
20      be carried out by the Secretary, subject to subsection
21      (b).
22             (4) CHARLOTTE AMALIE (ST. THOMAS) HARBOR,
23      UNITED STATES VIRGIN ISLANDS.—Notwithstanding

24      section 1002 of the Water Resources Development Act
25      of 1986 (100 Stat. 4221), the portion of the project for


     •S 1811 EAH
                               280
 1       navigation, Charlotte Amalie (St. Thomas) Harbor,
 2       St. Thomas, United States Virgin Islands, authorized
 3       by the Act of August 26, 1937 (chapter 832, 50 Stat.
 4       850), and deauthorized under section 1002 of the
 5       Water Resources Development Act of 1986 (100 Stat.
 6       4221), is authorized to be carried out by the Sec-
 7       retary, subject to subsection (b).
 8       (b) REPORT TO CONGRESS.—The Secretary shall com-
 9 plete and submit to the Committee on Transportation and
10 Infrastructure of the House of Representatives and the Com-
11 mittee on Environment and Public Works of the Senate a
12 post-authorization change report (as such term is defined
13 in section 1132(d) of the Water Resources Development Act
14 of 2016 (33 U.S.C. 2282e(d)) prior to carrying out a project
15 identified in subsection (a).
16   SEC. 356. CONVEYANCES.

17       (a) GENERALLY APPLICABLE PROVISIONS.—
18            (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—
19       The exact acreage and the legal description of any
20       real property to be conveyed under this section shall
21       be determined by a survey that is satisfactory to the
22       Secretary.
23            (2) APPLICABILITY      OF   PROPERTY   SCREENING

24       PROVISIONS.—Section 2696 of title 10, United States




      •S 1811 EAH
                             281
 1      Code, shall not apply to any conveyance under this
 2      section.
 3           (3) COSTS OF CONVEYANCE.—An entity to which
 4      a conveyance is made under this section shall be re-
 5      sponsible for all reasonable and necessary costs, in-
 6      cluding real estate transaction and environmental
 7      documentation costs, associated with the conveyance.
 8           (4) LIABILITY.—An entity to which a conveyance
 9      is made under this section shall hold the United
10      States harmless from any liability with respect to ac-
11      tivities carried out, on or after the date of the convey-
12      ance, on the real property conveyed. The United
13      States shall remain responsible for any liability with
14      respect to activities carried out, before such date, on
15      the real property conveyed.
16           (5) ADDITIONAL TERMS AND CONDITIONS.—The
17      Secretary may require that any conveyance under
18      this section be subject to such additional terms and
19      conditions as the Secretary considers necessary and
20      appropriate to protect the interests of the United
21      States.
22      (b) EUFAULA, ALABAMA.—
23           (1) CONVEYANCE AUTHORIZED.—The Secretary
24      shall convey to the City of Eufaula, Alabama, all
25      right, title, and interest of the United States in and


     •S 1811 EAH
                            282
 1      to the real property described in the Department of
 2      the Army Lease No. DACW01–2–17–0747, containing
 3      56.76 acres, more or less, and being a part of Tracts
 4      L–1268 (26.12 acres), L–1273 (13.71 acres), L–1278
 5      (6.75 acres), and L1279 (10.36 acres) of the Walter
 6      F. George Lock and Dam and Lake project.
 7           (2) DEED.—The Secretary shall convey the prop-
 8      erty under this subsection by quitclaim deed under
 9      such terms and conditions as the Secretary deter-
10      mines appropriate to protect the interests of the
11      United States.
12           (3) CONSIDERATION.—The City of Eufaula, Ala-
13      bama, shall pay to the Secretary an amount that is
14      not less than the fair market value of the property
15      conveyed under this subsection, as determined by the
16      Secretary.
17      (c) MONTGOMERY, ALABAMA.—
18           (1) CONVEYANCE AUTHORIZED.—The Secretary
19      shall convey to the City of Montgomery, Alabama, all
20      right, title, and interest of the United States in and
21      to the real property described in paragraph (2).
22           (2) PROPERTY.—The property to be conveyed is
23      the 62.38 acres of land and water under the primary
24      jurisdiction of the Secretary in the R.E. ‘‘Bob’’ Wood-
25      ruff Project Area that is covered by lease number


     •S 1811 EAH
                             283
 1      DACW01–1–05–0037, including the parcels and
 2      structure known as ‘‘Powder Magazine’’.
 3           (3) DEADLINE.—To the extent practicable, the
 4      Secretary shall complete the conveyance under this
 5      subsection by not later than 180 days after the date
 6      of enactment of this Act.
 7           (4) DEED.—The Secretary shall convey the prop-
 8      erty under this subsection by quitclaim deed under
 9      such terms and conditions as the Secretary deter-
10      mines appropriate to protect the interests of the
11      United States, to include retaining the right to inun-
12      date with water any land transferred under this sub-
13      section.
14           (5) CONSIDERATION.—The City of Montgomery,
15      Alabama, shall pay to the Secretary an amount that
16      is not less than the fair market value of the property
17      conveyed under this subsection, as determined by the
18      Secretary.
19      (d) CONVEYANCE OF WILMINGTON HARBOR NORTH
20 DISPOSAL AREA, DELAWARE.—
21           (1) IN GENERAL.—As soon as practicable, the
22      Secretary shall complete the conveyance of the Wil-
23      mington Harbor North Disposal Area confined dis-
24      posal facility, Delaware, to the State of Delaware.




     •S 1811 EAH
                            284
 1           (2) DEED.—The Secretary shall convey the prop-
 2      erty under this subsection by quitclaim deed under
 3      such terms and conditions as the Secretary deter-
 4      mines appropriate to protect the interests of the
 5      United States.
 6           (3) CONSIDERATION.—The State of Delaware
 7      shall pay to the Secretary an amount that is not less
 8      than the fair market value of the property conveyed
 9      under this subsection, as determined by the Secretary.
10      (e) OHIO RIVER LOCK AND DAM NUMBER 52, MASSAC
11 COUNTY, ILLINOIS.—
12           (1) CONVEYANCE AUTHORIZED.—The Secretary
13      shall convey to the Massac-Metropolis Port District,
14      Illinois, all right, title, and interest of the United
15      States in and to any real property located north of
16      the south bank of the Ohio River in Massac County,
17      Illinois, that is associated with the Ohio River Lock
18      and Dam 52.
19           (2) DEED.—The Secretary shall convey the prop-
20      erty under this subsection by quitclaim deed under
21      such terms and conditions as the Secretary deter-
22      mines appropriate to protect the interests of the
23      United States.
24           (3)   CONSIDERATION.—The      Massac-Metropolis
25      Port District, Illinois, shall pay to the Secretary an


     •S 1811 EAH
                              285
1        amount that is not less than fair market value of the
2        property conveyed under this subsection, as deter-
3        mined by the Secretary.
 4       (f) UPPER ST. ANTHONY FALLS LOCK AND DAM, MIN-
 5   NEAPOLIS, MINNESOTA.—

 6            (1) CONVEYANCE        AUTHORIZED.—As      soon as
 7       practicable after the date of enactment of this Act, the
 8       Secretary shall, upon request—
 9                  (A) convey, without consideration, to the
10            City of Minneapolis, Minnesota, or its designee,
11            all or substantially all of the real property
12            owned by the United States adjacent to or in the
13            vicinity of the Upper St. Anthony Falls Lock
14            and Dam, subject to the right of the Secretary to
15            retain any easements in such property solely to
16            the extent necessary to continue to operate and
17            maintain the Upper St. Anthony Falls Lock and
18            Dam; and
19                  (B) provide, without consideration, to the
20            City or its designee—
21                      (i) access and use rights by license,
22                  easement, or similar agreement, to any real
23                  property and structures at the site of the
24                  Upper St. Anthony Falls Lock and Dam




      •S 1811 EAH
                                 286
 1                 that is not conveyed under subparagraph
 2                 (A); and
 3                        (ii) for any such property retained by
 4                 the Secretary, exclusive license or easement
 5                 over such property to allow the City or its
 6                 designee to construct, use, and operate
 7                 amenities thereon, and to utilize such prop-
 8                 erty    as    a     comprehensive   recreational,
 9                 touristic, and interpretive experience.
10           (2) OWNERSHIP AND OPERATION OF LOCK AND
11      DAM.—Ownership          rights to the Upper St. Anthony
12      Falls Lock and Dam shall not be conveyed under this
13      subsection, and the Secretary shall retain all rights to
14      operate and maintain the Upper St. Anthony Falls
15      Lock and Dam.
16           (3) REVERSION.—If the Secretary determines
17      that the property conveyed under this subsection is
18      not used for a public purpose, all right, title, and in-
19      terest in and to the property shall revert, at the dis-
20      cretion of the Secretary, to the United States.
21           (4) UPPER ST. ANTHONY FALLS LOCK AND DAM
22      DEFINED.—In       this subsection, the term ‘‘Upper St.
23      Anthony Falls Lock and Dam’’ means the lock and
24      dam located on Mississippi River Mile 853.9 in Min-
25      neapolis, Minnesota.


     •S 1811 EAH
                             287
 1      (g) CLINTON, MISSOURI.—
 2           (1) CONVEYANCE AUTHORIZED.—The Secretary
 3      shall convey to the City of Clinton, Missouri, without
 4      consideration, all right, title, and interest of the
 5      United States in and to the real property described
 6      in paragraph (2).
 7           (2) PROPERTY.—The property to be conveyed is
 8      a tract of land situated in the S 1⁄2 of Section 12 and
 9      the N 1⁄2 of Section 13, Township 41 North, Range 26
10      West of the Fifth Principal Meridian, Henry County,
11      Missouri, more particularly described as follows: Be-
12      ginning at the point of intersection of the north line
13      of said S 1⁄2 of Section 12 and the easterly right-of-
14      way of State Highway No. 13; thence easterly along
15      the north line of said S 1⁄2 to the northeast corner of
16      the W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 of said Section 12;
17      thence southerly along the east line of said W 1⁄2 NW
18      14
         ⁄ NE 1⁄4 SW 1⁄4 to the southeast corner thereof;
19      thence easterly along the north line of the S 1⁄2 NE
20      14
         ⁄ SW 1⁄4 of said Section 12 to the southwest corner
21      of the W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 of said Section 12;
22      thence in a northeasterly direction to the northeast
23      corner of said W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 ; thence
24      easterly along the north line of said S 1⁄2 to the west-
25      erly right-of-way of the County Road; thence in a


     •S 1811 EAH
                             288
 1      southeasterly and southerly direction along the west-
 2      erly right-of-way of said County Road approximately
 3      2500 feet to the center of Deer Creek; thence in a
 4      southwesterly direction along the center of said Deer
 5      Creek, approximately 3900 feet to the south line of
6       said N 1⁄2 of Section 13; thence westerly along the
 7      south line of said N 1⁄2 to the easterly right-of-way
 8      line of the St. Louis-San Francisco Railroad; thence
 9      in a northwesterly direction along the easterly right-
10      of-way of said railroad to the easterly right-of-way of
11      said State Highway No. 13; thence in a northeasterly
12      direction along the easterly right-of-way of said State
13      Highway No. 13 to the point of the beginning; and
14      including a roadway easement for ingress and egress,
15      described as a strip of land 80 feet in width, lying
16      40 feet on each side of the following described line, the
17      initial extremities of the following described strip
18      being extended or reduced as required to exactly ad-
19      join the boundary lines which they meet, situated in
20      the S 1⁄2 of Section 12, Township 41 North Range 26
21      West of the Fifth Principal Meridian, Henry County,
22      Missouri, more particularly described as follows:
23      Commencing at the center of said Section 12, thence
24      Sl°24’56’’W,   1265.52     feet   to   a   point,   thence
25      N88°29’02’’W, 483.97 feet to the point of beginning of


     •S 1811 EAH
                                 289
 1      the strip of land herein described; thence in a north-
 2      easterly direction along a curve to the right, said
 3      curve      having   an    initial   tangent   bearing   of
 4      N3°44’4l’’E, a radius of 238.73 feet and an interior
 5      angle of 61°29’26’’, an arc distance of 256.21 feet to
 6      a point; thence N65°14’07’’E 218.58 feet to a point;
 7      thence in a northeasterly direction along a curve to
 8      the left, having a radius of 674.07 feet and an inte-
 9      rior angle of 36°00’01’’, an arc distance of 423.53 feet
10      to a point; thence N29°14’07’’E, 417.87 feet to a
11      point; thence northeasterly along a curve to the right,
12      having a radius of 818.51 feet and an interior angle
13      of 14°30’01’’, an arc distance of 207.15 feet to a
14      point; thence N43°44’07’’E, 57.00 feet to the southerly
15      right-of-way line of a county road, containing 2,948
16      acres, more or less; Excluding therefrom a tract of
17      land situated in the S 1⁄2 of said Section 12, said
18      Township and Range, described as commencing at the
19      center of said Section 12; thence S1°24’56’’W, 1265.52
20      feet to the point of beginning of the tract of land here-
21      in described; thence N88°29’02’’W, 1122.50 feet;
22      thence S1°43’26’’W, 872.62 feet; thence S88°29’02’’E,
23      1337.36 feet; thence Nl°43’26’’E, 872.62 feet; thence
24      N88°29’02’’W, 214.86 feet to the point of beginning,
25      containing 26.79 acres, more or less. The above de-


     •S 1811 EAH
                              290
 1       scribed tract contains, in the aggregate, 177.69 acres,
 2       more or less.
 3             (3) DEED.—The Secretary shall convey the prop-
 4       erty under this subsection by quitclaim deed under
 5       such terms and conditions as the Secretary deter-
 6       mines appropriate to protect the interests of the
 7       United States.
 8             (4) REVERSION.—If the Secretary determines
 9       that the property conveyed under this subsection is
10       not being used for a public purpose, all right, title,
11       and interest in and to the property shall revert, at the
12       discretion of the Secretary, to the United States.
13       (h) CITY OF CLINTON, OLD ORCHARD ADDITION, MIS-
14   SOURI.—

15             (1) CONVEYANCE AUTHORIZED.—The Secretary
16       shall convey to the City of Clinton, Missouri, all
17       right, title, and interest of the United States in and
18       to the real property described in paragraph (2).
19             (2) PROPERTY.—The property to be conveyed is
20       Lot 28 in Old Orchard Addition, a subdivision of the
21       City of Clinton, Henry County, Missouri, containing
22       0.36 acres, more or less, including any improvements
23       thereon.
24             (3) DEED.—The Secretary shall convey the prop-
25       erty under this subsection by quitclaim deed under


      •S 1811 EAH
                              291
 1      such terms and conditions as the Secretary deter-
 2      mines appropriate to protect the interests of the
 3      United States, including such reservations, terms, and
 4      conditions as the Secretary determines necessary to
 5      allow the United States to operate and maintain the
 6      Harry S. Truman Reservoir Project.
 7             (4) CONSIDERATION.—The City of Clinton, Mis-
 8      souri, shall pay to the Secretary an amount that is
 9      not less than the fair market value of the property
10      conveyed under this subsection, as determined by the
11      Secretary.
12      (i) TRI-COUNTY LEVEE DISTRICT, MISSOURI.—
13             (1) CONVEYANCE AUTHORIZED.—The Secretary
14      shall convey to the Tri-County Levee District, Mis-
15      souri, all right, title, and interest of the United States
16      in and to the real property described in paragraph
17      (2).
18             (2) PROPERTY.—The property to be conveyed is
19      the part of Sections 1 and 12 Township 45 North
20      Range 6 West of the 5th P.M. in Montgomery County,
21      Missouri, described as follows: A tract of land being
22      60’ wide and lying South and East of and adjoining
23      the centerline of the existing levee and being described
24      as follows: Commencing at the NW corner of Section
25      12, thence S 87° 52’ 35’’ E 587.4’, thence S 01° 29’


     •S 1811 EAH
                             292
 1      25’’ W 453.68’ to the point of the beginning; said
 2      point being in the center of the levee, thence with the
 3      centerline of the levee N 77° 01’ 30’’ E 164.92’, thence
 4      N 74° 26’ 55’’ E 250.0’, thence N 72° 27’ 55’’ E
 5      270.0’, thence N 69° 06’ 10’’ E 300.0’, thence N 66°
 6      42’ 15’’ E 500.0’, thence N 64° 14’ 30’’ E 270.0’,
 7      thence N 61° 09’ 10’’ E 800.0’, thence N 60° 58’ 15’’
 8      E 1724.45’, thence leaving the centerline S 01° 10’
 9      35’’ W 69.43’, thence parallel with the above described
10      centerline S 60° 58’ 15’’ W 1689.62’, thence S 61° 09’
11      10’’ W 801.71’, thence S 64° 14’ 30’’ W 272.91’,
12      thence S 66° 42’ 15’’ W 502.55’, thence S 69° 06’ 10’’
13      W 303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S
14      74° 26’ 55’’ W 252.39’, thence S 77° 01’ 30’’ W
15      181.75’, thence leaving the South side of the levee N
16      01° 26’ 25’’ E 61.96’ to the point of beginning and
17      containing 5.89 acres more or less.
18           (3) DEED.—The Secretary shall convey the prop-
19      erty under this subsection by quitclaim deed under
20      such terms and conditions as the Secretary deter-
21      mines appropriate to protect the interests of the
22      United States.
23           (4) CONSIDERATION.—The Tri-County Levee
24      District, Missouri, shall pay to the Secretary an
25      amount that is not less than the fair market value of


     •S 1811 EAH
                                293
 1      the property conveyed under this subsection, as deter-
 2      mined by the Secretary.
 3      (j) JUDGE JOSEPH BARKER, JR., HOUSE, OHIO.—
 4           (1) NON-FEDERAL ENTITY.—In this subsection,
 5      the term ‘‘non-Federal entity’’ means the Friends of
 6      Joseph Barker, Jr., House, a nonprofit organization
 7      in the State of Ohio.
 8           (2) CONVEYANCE AUTHORIZED.—
 9                   (A) IN   GENERAL.—Subject    to paragraph
10           (6), the Secretary shall convey to the non-Federal
11           entity, without consideration, all right, title, and
12           interest of the United States in and to the prop-
13           erty described in paragraph (3)(A).
14                   (B) EASEMENT.—Upon conveyance of the
15           property under subparagraph (A), the Secretary
16           shall provide to the non-Federal entity, without
17           consideration, an easement over the property de-
18           scribed in paragraph (3)(B) for access to the
19           conveyed property for as long as the non-Federal
20           entity is in legal possession of the conveyed prop-
21           erty.
22           (3) DESCRIPTIONS OF PROPERTY.—
23                   (A) IN GENERAL.—The property referred to
24           in paragraph (2)(A) is the following (as in exist-
25           ence on the date of enactment of this Act):


     •S 1811 EAH
                              294
1                       (i)   JUDGE    JOSEPH    BARKER,     JR.,

 2                 HOUSE.—The tract of land situated in the

 3                 State of Ohio, Washington County, on the
 4                 Ohio River, and being particularly bounded
 5                 and described as follows: Beginning at a
 6                 point located on the southern right-of-way
 7                 line of Ohio Route 7, a new corner to the
 8                 land now or formerly owned by the United
 9                 States of America; thence, leaving the right-
10                 of-way of said Route 7 and severing the
11                 land of said United States of America par-
12                 allel to and approximately 10 feet easterly
13                 of the toe of the existing dredge disposal
14                 berm, southeasterly approximately 326 feet
15                 to a point prior to the current Corps of En-
16                 gineers access to the dredging spoil area;
17                 thence, northeasterly approximately 480 feet
18                 paralleling the top of the slope to the river-
19                 bank side of the house and approximately
20                 25 feet northerly therefrom; thence, north-
21                 west approximately 302 feet to a point in
22                 the southern right-of-way of Ohio Route 7;
23                 thence with the right-of-way of said Route
24                 7, southwesterly approximately 485 feet to




     •S 1811 EAH
                              295
 1                 the point of beginning, containing approxi-
 2                 mately 3.51 acres.
 3                      (ii) ROAD TRACT.—The tract of land
 4                 situated in the State of Ohio, Washington
 5                 County, on the Ohio River, and being par-
 6                 ticularly bounded and described as follows:
 7                 Beginning at a point located on the south-
 8                 ern right-of-way line of Ohio Route 7, a
 9                 new corner to the land now or formerly
10                 owned by the United States of America;
11                 thence, leaving the right-of-way of said
12                 Route 7 and severing the land of said
13                 United States of America and with the
14                 House Parcel southeasterly 25 feet; thence,
15                 northeast, running parallel to said Route 7
16                 right-of-way, approximately 994 feet to a
17                 point of deflection; thence northeasterly 368
18                 feet to a point beyond the existing fence cor-
19                 ner; thence, east 140 feet to the edge of the
20                 existing Willow Island access road; thence
21                 with said access road, northwesterly ap-
22                 proximately 62 feet to a point in the south-
23                 ern right-of-way of Ohio Route 7; thence
24                 with the right-of-way of said Route 7,
25                 southwesterly approximately 1,491 feet to


     •S 1811 EAH
                             296
1                  the point of beginning, containing approxi-
2                  mately 1 acre.
 3                 (B) EASEMENT.—The property referred to
 4           in paragraph (2)(B) is the following: The tract
 5           of land situated in the State of Ohio, Wash-
 6           ington County, on the Ohio River, and being
 7           particularly bounded and described as follows:
 8           Beginning at a point at the intersection of the
 9           southern right-of-way of Ohio Route 7 and the
10           northeast side of the existing Willow Island ac-
11           cess road, a new corner to the land now or for-
12           merly owned by the United States of America;
13           thence, southwest, running with said Route 7
14           right-of-way, approximately 30 feet to a point on
15           the southwest side of the existing access road,
16           and corner to the road tract; thence with said ac-
17           cess road and the line of the road parcel, south-
18           easterly approximately 62 feet to a point; thence
19           leaving the road parcel and crossing the existing
20           access road northeasterly approximately 30 feet
21           to a point located on the northeast side of the ex-
22           isting access road; thence, northwesterly approxi-
23           mately 62 feet, to the point of beginning, con-
24           taining approximately 0.04 acre.




     •S 1811 EAH
                             297
1            (4) DEED.—The Secretary shall convey the prop-
2       erty under this subsection by quitclaim deed under
3       such terms and conditions as the Secretary deter-
4       mines appropriate to protect the interests of the
5       United States.
 6           (5) REVERSION.—If the Secretary determines
 7      that the property conveyed under this subsection is
 8      not being used by the non-Federal entity for a public
 9      purpose, all right, title, and interest in and to the
10      property shall revert, at the discretion of the Sec-
11      retary, to the United States.
12           (6) REQUIREMENTS.—
13                 (A) IMPROVEMENTS.—The Secretary shall
14           make such improvements and alterations to the
15           property described in paragraph (3)(A)(i) as the
16           Secretary, in consultation with the non-Federal
17           entity and relevant stakeholders, determines to be
18           appropriate to facilitate conveyance of the prop-
19           erty and provision of the easement under this
20           subsection, subject to the condition that the total
21           cost of those improvements and alterations un-
22           dertaken by the Secretary shall be not more than
23           $120,000.




     •S 1811 EAH
                                 298
 1                 (B) ENVIRONMENTAL ASSESSMENT.—Before
 2           making a conveyance under paragraph (2), the
 3           Secretary shall—
 4                      (i) conduct, with respect to the prop-
 5                 erty to be conveyed, an assessment of the en-
 6                 vironmental condition of the property, in-
 7                 cluding an investigation of any potential
 8                 hazardous,     toxic,   or   radioactive   waste
 9                 present on such property; and
10                      (ii) submit to the non-Federal entity a
11                 report describing the results of such assess-
12                 ment.
13                 (C) REFUSAL BY NON-FEDERAL ENTITY.—
14                      (i) IN GENERAL.—Upon review by the
15                 non-Federal entity of the report under sub-
16                 paragraph (B), the non-Federal entity may
17                 elect to refuse the conveyance under this
18                 subsection.
19                      (ii) ELECTION.—An election under
20                 clause (i)—
21                           (I) shall be at the sole discretion
22                      of the non-Federal entity; and
23                           (II) shall be made by the non-Fed-
24                      eral entity by not later than the date
25                      that is 30 days after the date of sub-


     •S 1811 EAH
                             299
 1                     mission of the report under subpara-
 2                     graph (B)(ii).
 3                 (D) DREDGED MATERIAL PLACEMENT AC-
 4           TIVITIES.—The Secretary shall—

 5                     (i) notify and coordinate with the non-
 6                 Federal entity and relevant stakeholders be-
 7                 fore carrying out any dredged material
 8                 placement activities associated with the
 9                 property described in paragraph (3)(A)
10                 after the date on which such property is
11                 conveyed under this subsection; and
12                     (ii) in carrying out a dredged material
13                 placement activity under clause (i), act in
14                 accordance with Engineer Manual EM
15                 1110–2–5025 (or a subsequent version of
16                 that manual).
17           (7) RESERVATION OF RIGHTS.—The Secretary
18      may reserve and retain from any conveyance under
19      this subsection a right-of-way or any other right that
20      the Secretary determines to be necessary for the oper-
21      ation and maintenance of the authorized Federal
22      channel along the Ohio River.
23           (8) TREATMENT.—Conveyance to the non-Fed-
24      eral entity under this subsection of property described




     •S 1811 EAH
                              300
1        in paragraph (3)(A)(i) shall satisfy all obligations of
2        the Secretary with respect to such property under—
3                   (A) section 306101 of title 54, United States
4             Code; and
5                   (B) section 306108 of title 54, United States
6             Code, with respect to the effects on the property
7             of dredged material placement activities carried
8             out by the Secretary after the date of the convey-
9             ances.
10            (9) INAPPLICABILITY.—Subtitle I of title 40, and
11       chapter 4 of title 41, United States Code shall not
12       apply to any conveyance or easement provided under
13       this subsection.
14       (k) LEABURG FISH HATCHERY, LANE COUNTY, OR-
15   EGON.—

16            (1) CONVEYANCE AUTHORIZED.—Subject to the
17       provisions of this subsection, the Secretary shall con-
18       vey, without consideration, to the State of Oregon,
19       acting through the Oregon Department of Fish and
20       Wildlife, all right, title, and interest of the United
21       States in and to the real property comprising the
22       Leaburg Fish Hatchery, consisting of approximately
23       21.55 acres, identified as tracts Q–1500, Q–1501E,
24       and 300E–1 and described in Department of the




      •S 1811 EAH
                            301
 1      Army Lease No. DACW57–1–18–0009, together with
 2      any improvements on the property.
 3           (2) WATER RIGHTS.—The Secretary may trans-
 4      fer to the State of Oregon, acting through the Oregon
 5      Department of Fish and Wildlife, any water rights
 6      held by the United States that are appurtenant to the
 7      property conveyed under this subsection.
 8           (3) DEED.—The Secretary shall convey the prop-
 9      erty under this subsection by quitclaim deed under
10      such terms and conditions as the Secretary deter-
11      mines appropriate to protect the interests of the
12      United States, including a condition that all of the
13      property conveyed under this subsection be used and
14      maintained by the State of Oregon for the purpose of
15      operating a fish hatchery in perpetuity.
16           (4) REVERSION.—If the Secretary determines
17      that the property conveyed under this subsection is
18      not being used or maintained by the State of Oregon
19      for the purpose of operating a fish hatchery in per-
20      petuity, all or any portion of the property, including
21      any water rights transferred under this subsection,
22      shall, at the option of the Secretary, revert to the
23      United States.
24           (5) SAVINGS CLAUSE.—If the State of Oregon
25      does not accept the conveyance under this subsection,


     •S 1811 EAH
                              302
 1      the Secretary may dispose of the property, including
 2      appurtenant water rights, under subchapter III of
 3      chapter 5 of title 40, United States Code.
 4      (l) WILLAMETTE FALLS LOCKS, WILLAMETTE RIVER,
 5 OREGON.—
 6           (1) DEFINITIONS.—In this section:
 7                 (A) REAL    ESTATE APPENDIX.—The        term
 8           ‘‘real estate appendix’’ means Appendix A of the
 9           document published by the District Commander
10           of the Portland District of the Corps of Engi-
11           neers, titled ‘‘Willamette Falls Locks Willamette
12           River Oregon Section 216 Disposition Study
13           with Integrated Environmental Assessment’’.
14                 (B) RECEIVING ENTITY.—The term ‘‘receiv-
15           ing entity’’ means an entity identified by the
16           State of Oregon, in consultation with the Wil-
17           lamette Falls Locks Commission, to receive the
18           conveyance under paragraph (2).
19                 (C) WILLAMETTE FALLS LOCKS PROJECT.—
20           The term ‘‘Willamette Falls Locks project’’
21           means the project for navigation, Willamette
22           Falls Locks, Willamette River, Oregon, author-
23           ized by the Act of June 25, 1910 (36 Stat. 664,
24           chapter 382).




     •S 1811 EAH
                              303
 1                 (D) WILLAMETTE FALLS LOCKS REPORT.—
 2           The term ‘‘Willamette Falls Locks report’’ means
 3           the memorandum of the Director of Civil Works
 4           with the subject ‘‘Willamette Falls Locks (WFL),
 5           Willamette River Oregon Section 216 Disposi-
 6           tion Study with Integrated Environmental As-
 7           sessment (Study)’’, dated July 11, 2019.
 8           (2) CONVEYANCE AUTHORIZED.—The Secretary
 9      is authorized to convey to the receiving entity, with-
10      out consideration, all right, title, and interest of the
11      United States in and to any land in which the Fed-
12      eral Government has a property interest for the Wil-
13      lamette Falls Locks project, together with any im-
14      provements on the land, subject to the requirements of
15      this subsection and in accordance with the Willamette
16      Falls Locks report.
17           (3) DEED.—The Secretary shall convey the prop-
18      erty under this subsection by quitclaim deed under
19      such terms and conditions as the Secretary deter-
20      mines appropriate to protect the interests of the
21      United States.
22           (4) SUBJECT      TO    EXISTING   EASEMENTS   AND

23      OTHER      INTERESTS.—The     conveyance of property
24      under paragraph (2) shall be subject to all existing




     •S 1811 EAH
                             304
1       deed reservations, easements, rights-of-way, and leases
2       that are in effect as of the date of the conveyance.
3            (5) REVERSION.—If the Secretary determines
4       that the property conveyed under this subsection cease
5       to be held in public ownership, all right, title, and in-
6       terest in and to the property shall revert, at the dis-
7       cretion of the Secretary, to the United States.
8            (6) REQUIREMENTS BEFORE CONVEYANCE.—
 9                 (A) PERPETUAL ROAD EASEMENT.—Before
10           making the conveyance under paragraph (2), the
11           Secretary shall acquire a perpetual road ease-
12           ment from an adjacent property owner for use of
13           an access road, which easement shall convey with
14           the property conveyed under such paragraph.
15                 (B) ENVIRONMENTAL COMPLIANCE.—Before
16           making the conveyance under paragraph (2), in
17           accordance with the real estate appendix, the
18           Secretary shall complete a Phase 1 Environ-
19           mental Site Assessment pursuant to the Com-
20           prehensive Environmental Response, Compensa-
21           tion, and Liability Act of 1980 (42 U.S.C. 9601
22           et seq.).
23                 (C) HISTORIC     PRESERVATION.—The          Sec-
24           retary may enter into a memorandum of agree-
25           ment with the Oregon State Historic Preserva-


     •S 1811 EAH
                                305
 1            tion Office and the Advisory Council on Historic
 2            Preservation that identifies actions the Secretary
 3            shall take before making the conveyance under
 4            paragraph (2).
 5                  (D) REPAIRS.—Before making the convey-
 6            ance under paragraph (2), the Secretary shall
 7            carry out repairs to address primary seismic
 8            and safety risks in accordance with the rec-
 9            ommendations approved in the Willamette Falls
10            Locks report.
11            (7) DEAUTHORIZATION.—Beginning on the date
12       on which the Secretary makes the conveyance under
13       paragraph (2), the Willamette Falls Locks project is
14       no longer authorized.
15   SEC. 357. LAKE EUFAULA ADVISORY COMMITTEE.

16       Section 3133(b) of the Water Resources Development
17 Act of 2007 (121 Stat. 1141) is amended by adding at the
18 end the following:
19            ‘‘(5) TERMINATION.—The committee shall termi-
20       nate on the date that is 30 days after the date on
21       which the committee submits final recommendations
22       to the Secretary.’’.




      •S 1811 EAH
                               306
 1   SEC. 358. REPEAL OF MISSOURI RIVER TASK FORCE, NORTH

 2                  DAKOTA.

 3       (a) IN GENERAL.—Section 705 of the Water Resources
 4 Development Act of 2000 (114 Stat. 2696) is repealed.
 5       (b) CONFORMING AMENDMENTS.—
 6            (1) PURPOSES.—Section 702(b)(3) of the Water
 7       Resources Development Act of 2000 (114 Stat. 2695)
 8       is amended by inserting ‘‘prepared under section
 9       705(e) (as in effect on the day before the date of en-
10       actment of the Water Resources Development Act of
11       2020)’’ before the period at the end.
12            (2) DEFINITIONS.—Section 703 of the Water Re-
13       sources Development Act of 2000 (114 Stat. 2695) is
14       amended—
15                   (A) by striking paragraphs (2) and (4); and
16                   (B) by redesignating paragraphs (3) and
17            (5) as paragraphs (2) and (3), respectively.
18   SEC. 359. REPEAL OF MISSOURI RIVER TASK FORCE, SOUTH

19                  DAKOTA.

20       (a) IN GENERAL.—Section 905 of the Water Resources
21 Development Act of 2000 (114 Stat. 2709) is repealed.
22       (b) CONFORMING AMENDMENTS.—
23            (1) PURPOSES.—Section 902(b)(3) of the Water
24       Resources Development Act of 2000 (114 Stat. 2708)
25       is amended by inserting ‘‘prepared under section
26       905(e) (as in effect on the day before the date of en-
      •S 1811 EAH
                               307
 1       actment of the Water Resources Development Act of
 2       2020)’’ before the period at the end.
 3             (2) DEFINITIONS.—Section 903 of the Water Re-
 4       sources Development Act of 2000 (114 Stat. 2708) is
 5       amended—
 6                  (A) by striking paragraphs (2) and (4); and
 7                  (B) by redesignating paragraphs (3) and
 8             (5) as paragraphs (2) and (3), respectively.
 9   SEC. 360. CONFORMING AMENDMENTS.

10       (a) Section 710 of the Water Resources Development
11 Act of 1986 (33 U.S.C. 2264), and the item relating to such
12 section in the table of contents, are repealed.
13       (b) Section 1001 of the Water Resources Development
14 Act of 1986 (33 U.S.C. 579a) is amended—
15             (1) in subsection (b), by striking paragraph (2)
16       and redesignating paragraph (3) as paragraph (2);
17       and
18             (2) by striking subsection (c).
19       (c) Section 1001 of the Water Resources Reform and
20 Development Act of 2014 (33 U.S.C. 2282c) is amended—
21             (1) in subsection (d)—
22                  (A) in paragraph (1), by striking ‘‘Notwith-
23             standing the requirements of subsection (c), the
24             Secretary’’ and inserting ‘‘The Secretary’’;




      •S 1811 EAH
                               308
 1                  (B) by striking ‘‘subsections (a) and (c)’’
 2            each place it appears and inserting ‘‘subsection
 3            (a)’’; and
 4                  (C) by striking paragraph (4); and
 5            (2) by striking subsection (c) and redesignating
 6       subsections (d) through (g) as subsections (c) through
 7       (f), respectively.
 8       (d) Section 6003 of the Water Resources Reform and
 9 Development Act of 2014 (33 U.S.C. 579c), and the item
10 relating to such section in the table of contents, are repealed.
11       (e) Section 1301 of the Water Resources Development
12 Act of 2016 (33 U.S.C. 579d), and the item relating to such
13 section in the table of contents, are repealed.
14       (f) Section 1302 of the Water Resources Development
15 Act of 2016 (33 U.S.C. 579c–1), and the item relating to
16 such section in the table of contents, are repealed.
17       (g) Section 1301 of the Water Resources Development
18 Act of 2018 (33 U.S.C. 579d–1), and the item relating to
19 such section in the table of contents, are repealed.
20       (h) Section 1302 of the Water Resources Development
21 Act of 2018 (33 U.S.C. 579c–2), and the item relating to
22 such section in the table of contents, are repealed.




      •S 1811 EAH
                                  309
 1     TITLE IV—WATER RESOURCES
 2          INFRASTRUCTURE
 3   SEC. 401. PROJECT AUTHORIZATIONS.

 4       The following projects for water resources development
 5 and conservation and other purposes, as identified in the
 6 reports titled ‘‘Report to Congress on Future Water Re-
 7 sources Development’’ submitted to Congress pursuant to
 8 section 7001 of the Water Resources Reform and Develop-
 9 ment Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed
10 by Congress, are authorized to be carried out by the Sec-
11 retary substantially in accordance with the plans, and sub-
12 ject to the conditions, described in the respective reports or
13 decision documents designated in this section:
14            (1) NAVIGATION.—

                                     C.
                                   Date of                  D.
       A.            B.           Report of             Estimated
      State         Name           Chief of               Costs
                                  Engineers

     1. AK    Port of Nome        May 29,       Federal: $378,908,000
                Modifications      2020         Non-Federal: $126,325,000
                                                Total: $505,233,000

     2. AK    St. George Harbor   August 13,    Federal: $147,874,000
                Improvement,        2020        Non-Federal: $16,508,000
                St. George                      Total: $164,382,000

     3. AK    Unalaska (Dutch     February 7,   Federal: $26,967,000
                Harbor) Chan-       2020        Non-Federal: $8,989,000
                nels                            Total: $35,956,000

     4. CT    New Haven Har-      May 7, 2020   Federal: $55,250,000
                bor Navigation                  Non-Federal: $19,442,000
                Improvement                     Total: $74,692,000
                Project




      •S 1811 EAH
                                 310
                                    C.
                                  Date of                   D.
      A.            B.           Report of              Estimated
     State         Name           Chief of                Costs
                                 Engineers

    5. NY,   New York and        April 23,      Federal: $19,550,000
       NJ      New Jersey          2020         Non-Federal: $6,520,000
               Harbor Anchor-                   Total: $26,070,000
               ages

    6. TX    Gulf Intracoastal   October 23,    Total: $414,144,000
               Waterway,           2019
               Brazos River
               Floodgates and
               Colorado River
               Locks

    7. TX    Houston Ship        April 23,      Federal: $625,204,000
              Channel Expan-       2020         Non-Federal: $260,431,000
              sion Channel                      Total: $885,635,000
              Improvement
              Project, Harris,
              Chambers, and
              Galveston Coun-
              ties

    8. TX    Matagorda Ship      November 15,   Federal: $140,156,000
              Channel Im-          2019         Non-Federal: $80,500,000
              provement                         Total: $220,656,000
              Project, Port
              Lavaca

    9. VA    Atlantic Intra-     August 25,     Federal: $102,755,000
               coastal Water-      2020         Non-Federal: $0
               way, North                       Total: $102,755,000
               Landing Bridge
               Replacement


1            (2) FLOOD RISK MANAGEMENT.—

                                    C.
                                  Date of                   D.
      A.            B.           Report of              Estimated
     State         Name           Chief of                Costs
                                 Engineers

    1. AZ    Little Colorado     December 14,   Federal: $54,260,000
               River at Wins-      2018         Non-Federal: $29,217,000
               low, Navajo                      Total: $83,477,000
               County




     •S 1811 EAH
                             311
                                C.
                              Date of                   D.
  A.            B.           Report of              Estimated
 State         Name           Chief of                Costs
                             Engineers

2. CA    Westminster, East   July 9, 2020   Federal: $324,905,000
          Garden Grove,                     Non-Federal: $940,191,000
          California Flood                  Total: $1,265,096,000
          Risk Manage-
          ment

3. CT,   Westchester Coun-   May 7, 2020    Federal: $15,199,000
   NY     ty Streams,                       Non-Federal: $15,199,000
          Byram River                       Total: $30,397,000
          Basin, Fairfield
          County, Con-
          necticut, and
          Westchester
          County, New
          York

4. KY    Louisville Metro-   October 27,    Federal: $122,170,000
           politan Flood       2020         Non-Federal: $65,917,000
           Protection Sys-                  Total: $188,087,000
           tem Reconstruc-
           tion, Jefferson
           and Bullitt
           Counties

5. ND    Souris River        April 16,      Federal: $59,582,915
           Basin Flood         2019         Non-Federal: $32,364,085
           Risk Manage-                     Total: $91,947,000
           ment

6. NJ    Peckman River       April 29,      Federal: $98,137,000
           Basin               2020         Non-Federal: $52,843,000
                                            Total: $150,980,000

7. NM    Middle Rio          March 13,      Federal: $201,944,451
           Grande Flood       2020          Non-Federal: $108,740,000
           Protection,                      Total: $310,684,000
           Bernalillo to
           Belen

8. OK    Tulsa and West-     April 23,      Federal: $89,311,000
           Tulsa Levee         2020         Non-Federal: $48,091,000
           System, Tulsa                    Total: $137,402,000
           County

9. PR    Rio Culebrinas at   August 17,     Federal: $17,295,600
           Aguiadilla and      2020         Non-Federal: $8,568,400
           Aguada                           Total: $25,864,000




 •S 1811 EAH
                                312
                                   C.
                                 Date of                   D.
      A.            B.          Report of              Estimated
     State         Name          Chief of                Costs
                                Engineers

    10. PR   Rio Guayanilla     August 13,     Federal: $103,422,000
               Flood Risk         2020         Non-Federal: $55,689,000
               Management,                     Total: $159,111,000
               Guayanilla

    11. PR   Rio Grande de      November 18,   Federal: $9,770,000
               Manati Flood       2020         Non-Federal: $4,520,000
               Risk Manage-                    Total: $14,290,000
               ment, Ciales

    12.      Savan Gut, St.     August 24,     Federal: $48,658,100
      USVI     Thomas             2020         Non-Federal: $25,455,900
                                               Total: $74,114,000

    13.      Turpentine Run,    August 17,     Federal: $29,817,850
      USVI     St. Thomas         2020         Non-Federal: $15,311,150
                                               Total: $45,129,000


1            (3) HURRICANE AND STORM DAMAGE RISK RE-
2       DUCTION.—


                                   C.
                                 Date of                   D.
      A.            B.          Report of              Estimated
     State         Name          Chief of                Costs
                                Engineers

    1. DE    Delaware Bene-     March 6,       Initial Federal: $66,464,000
               ficial Use of     2020          Initial Non-Federal:
               Dredged Mate-                     $35,789,000
               rial for the                    Total: $102,253,000
               Delaware River                  Renourishment Federal:
                                                 $120,023,000
                                               Renourishment Non-Federal:
                                                 $120,023,000
                                               Renourishment Total:
                                                 $240,046,000




     •S 1811 EAH
                             313
                                C.
                              Date of                   D.
  A.            B.           Report of              Estimated
 State         Name           Chief of                Costs
                             Engineers

2. NJ    New Jersey Bene-    April 8,       Initial Federal: $84,071,000
           ficial Use of       2020         Initial Non-Federal:
           Dredged Mate-                      $45,270,000
           rial for the                     Total: $129,341,000
           Delaware River                   Renourishment Federal:
                                              $85,495,000
                                            Renourishment Non-Federal:
                                              $85,495,000
                                            Renourishment Total:
                                              $170,990,000

3. NJ    Rahway River        June 9, 2020   Federal: $48,322,000
           Basin, New Jer-                  Non-Federal: $26,020,000
           sey Coastal                      Total: $74,342,000
           Storm Risk
           Management

4. NJ    Raritan Bay and     August 25,     Federal: $107,680,000
           Sandy Hook          2020         Non-Federal: $57,981,000
           Bay, Highlands                   Total: $165,661,000

5. NY    East Rockaway       August 22,     Initial Federal: $638,460,000
           Inlet to Rock-      2019         Initial Non-Federal: $0
           away Inlet and                   Total: $638,460,000
           Jamaica Bay,                     Renourishment Federal:
           Atlantic Coast                     $200,924,000
           of New York                      Renourishment Non-Federal:
                                              $200,924,000
                                            Renourishment Total:
                                              $401,847,000

6. NY    Fire Island Inlet   July 9, 2020   Initial Federal:
           to Montauk                         $1,576,790,000
           Point, New York                  Initial Non-Federal: $0
           Reformulation                    Total: $1,576,790,000
                                            Renourishment Federal:
                                              $767,695,000
                                            Renourishment Non-Federal:
                                              $767,695,000
                                            Renourishment Total:
                                              $1,535,390,000




 •S 1811 EAH
                                    314
                                       C.
                                     Date of                   D.
      A.             B.             Report of              Estimated
     State          Name             Chief of                Costs
                                    Engineers

    7. NY      Hashamomuck          December 9,    Initial Federal: $11,920,000
                Cove Coastal          2019         Initial Non-Federal:
                Storm Risk                           $6,418,000
                Management                         Total: $18,338,000
                                                   Renourishment Federal:
                                                     $24,237,000
                                                   Renourishment Non-Federal:
                                                     $24,237,000
                                                   Renourishment Total:
                                                     $48,474,000

    8. RI      Pawcatuck River      December 19,   Federal: $37,679,000
                 Coastal Storm        2018         Non-Federal: $20,289,000
                 Risk Manage-                      Total: $57,968,000
                 ment Project

    9. VA      Norfolk Coastal      February 5,    Federal: $942,920,000
                 Storm Risk           2019         Non-Federal: $507,730,000
                 Management                        Total: $1,450,650,000


1              (4) FLOOD RISK MANAGEMENT AND ECOSYSTEM
2           RESTORATION.—


                                       C.
                                     Date of                   D.
      A.             B.             Report of              Estimated
     State          Name             Chief of                Costs
                                    Engineers

    1. CO      South Platte River   July 29,       Federal: $344,076,000
                 and Tributaries,     2019         Non-Federal: $206,197,000
                 Adams and                         Total: $550,273,000
                 Denver Counties


3              (5) ECOSYSTEM RESTORATION.—

                                       C.
                                     Date of                   D.
      A.             B.             Report of              Estimated
     State          Name             Chief of                Costs
                                    Engineers

    1. CA      Delta Islands and    December 18,   Federal: $17,251,000
                 Levees               2018         Non-Federal: $9,289,000
                                                   Total: $26,540,000


     •S 1811 EAH
                              315
                                 C.
                               Date of                   D.
  A.            B.            Report of              Estimated
 State         Name            Chief of                Costs
                              Engineers

2. CA    Malibu Creek Eco-    November 13,   Federal: $172,249,000
          system Restora-       2020         Non-Federal: $106,960,000
          tion, Los Ange-                    Total: $279,209,000
          les and Ventura
          Counties

3. CA    Yuba River Eco-      June 20,       Federal: $66,975,000
           system Restora-      2019         Non-Federal: $36,064,000
           tion                              Total: $103,039,000

4. CO,   Rio Grande, Envi-    August 5,      Federal: $16,998,000
   NM,     ronmental Man-       2019         Non-Federal: $9,153,000
   TX      agement Pro-                      Total: $26,151,000
           gram, Sandia
           Pueblo to Isleta
           Pueblo, New
           Mexico, Eco-
           system Restora-
           tion

5. FL    Comprehensive Ev-    April 8,       Federal: $379,583,000
           erglades Res-        2020         Non-Federal: $375,737,000
           toration Plan,                    Total: $755,320,000
           Loxahatchee
           River Watershed
           Restoration
           Project, Martin
           and Palm Beach
           Counties

6. IA,   Grand River          November 18,   Federal: $78,876,000
   MO      Basin Eco-           2020         Non-Federal: $42,471,000
           system Restora-                   Total: $121,347,000
           tion

7. IL    The Great Lakes      May 23,        Federal: $557,730,550
           and Mississippi     2019          Non-Federal: $300,316,450
           River Interbasin                  Total: $858,047,000
           Study - Bran-
           don Road, Will
           County

8. IL    South Fork of the    July 9, 2020   Federal: $11,657,000
           South Branch of                   Non-Federal: $6,277,000
           the Chicago                       Total: $17,934,000
           River, Bubbly
           Creek, Eco-
           system Restora-
           tion


 •S 1811 EAH
                                  316
                                     C.
                                   Date of                   D.
      A.            B.            Report of              Estimated
     State         Name            Chief of                Costs
                                  Engineers

    9. MD     Anacostia Water-    December 19,   Federal: $25,866,750
                shed Restora-       2018         Non-Federal: $13,928,250
                tion, Prince                     Total: $39,795,000
                George’s County

    10. MO    St. Louis           November 1,    Federal: $61,362,893
                Riverfront-         2019         Non-Federal: $33,042,107
                Meramec River                    Total: $94,405,000
                Basin Eco-
                system Restora-
                tion

    11. NY,   Hudson-Raritan      May 26,        Federal: $273,933,000
      NJ       Estuary Eco-        2020          Non-Federal: $147,502,000
               system Restora-                   Total: $421,435,000
               tion

    12. NY    Hudson River        November 19,   Federal: $33,479,000
               Habitat Res-         2020         Non-Federal: $11,159,000
               toration                          Total: $44,638,000

    13. TX    Jefferson County    September      Federal: $38,942,000
                Ecosystem Res-      12, 2019     Non-Federal: $20,969,000
                toration                         Total: $59,911,000


1             (6) WATER SUPPLY.—

                                     C.
                                   Date of                   D.
      A.            B.            Report of              Estimated
     State         Name            Chief of                Costs
                                  Engineers

    1. OR     Willamette River    December 18,   Federal: $0
                Basin Review        2019         Non-Federal: $0
                Reallocation,                    Total: $0


2             (7) MODIFICATIONS AND OTHER PROJECTS.—




     •S 1811 EAH
                              317
                                 C.                      D.
  A.            B.             Date of               Estimated
 State         Name           Decision                 Costs
                              Document

1. CA    San Luis Rey         July 24,       Federal: $143,407,500
           Flood Control        2020         Non-Federal: $47,802,500
           Project, San                      Total: $191,210,000
           Diego County

2. FL    Caloosahatchee       July 24,       Federal: $514,999,000
           River West           2020         Non-Federal: $514,999,000
           Basin Storage                     Total: $1,029,998,000
           Reservoir (C-43
           WBSR)

3. FL    Central and          September      Federal: $66,736,500
           Southern Flor-       15, 2020     Non-Federal: $66,736,500
           ida, Canal 111                    Total: $133,473,000
           (C-111) South
           Dade Project

4. KY    Kentucky Lock        June 9, 2020   Total: $1,166,809,000

5. NC    Carolina Beach       June 16,       Federal: $25,125,000
           Integrated           2020         Non-Federal: $25,125,000
           Beach Re-                         Total: $50,250,000
           nourishment

6. NC    Wrightsville Beach   July 2, 2020   Federal: $60,068,000
                                             Non-Federal: $18,486,000
                                             Total: $78,554,000
                                             Renourishment Federal:
                                               $18,918,900
                                             Renourishment Non-Federal:
                                               $10,187,100
                                             Renourishment Total:
                                               $29,106,000

7. TX    Corpus Christi       May 4, 2020    Federal: $406,343,000
           Ship Channel,                     Non-Federal: $275,274,000
           Deepening and                     Total: $681,617,000
           Widening and
           Barge Shelves

8. VA    Atlantic Intra-      October 19,    Federal: $59,500,000
           coastal Water-       2020         Non-Federal: $0
           way Deep Creek                    Total: $59,500,000
           Bridge Replace-
           ment




 •S 1811 EAH
                                 318
 1   SEC. 402. SPECIAL RULES.

 2        (a)      GREAT    LAKES      AND   MISSISSIPPI    RIVER
 3 INTERBASIN PROJECT, BRANDON ROAD, WILL COUNTY, IL-
 4   LINOIS.—The Secretary shall carry out the project for eco-

 5 system restoration, Great Lakes and Mississippi River
 6 Interbasin project, Brandon Road, Will County, Illinois,
 7 authorized by section 401 of this Act, substantially in ac-
 8 cordance with the terms and conditions described in the Re-
 9 port of the Chief of Engineers, dated May 23, 2019, with
10 the following modifications:
11                (1) The Federal share of the cost of construction
12        shall be 80 percent.
13                (2) The Secretary may include the addition or
14        substitution of technologies or measures not described
15        in the report, as the Secretary determines to be advis-
16        able.
17        (b) EAST ROCKAWAY INLET TO ROCKAWAY INLET AND
18 JAMAICA BAY REFORMULATION, NEW YORK.—The project
19 for hurricane and storm damage reduction, East Rockaway
20 Inlet to Rockaway Inlet and Jamaica Bay, Atlantic Coast
21 of New York, authorized by section 401 of this Act, shall
22 be considered to be a continuation of the interim response
23 to the authorization by the House of Representatives dated
24 September 20, 1997, and the authorization under the head-
25 ing ‘‘Department of the Army—Corps of Engineers—


       •S 1811 EAH
                              319
 1 Civil—Construction’’ under chapter 4 of title X of the Dis-
 2 aster Relief Appropriations Act, 2013 (127 Stat. 24).
 3        (c) TULSA AND WEST-TULSA LEVEE SYSTEM, TULSA
 4 COUNTY, OKLAHOMA.—For the project for flood risk man-
 5 agement, Tulsa and West-Tulsa Levee System, Tulsa Coun-
 6 ty, Oklahoma, authorized by section 401 of this Act, the
 7 non-Federal contribution for the project shall be financed
 8 over a period of 30 years from the date of completion of
 9 the project, in accordance with section 103(k) of the Water
10 Resources Development Act of 1986 (33 U.S.C. 2213(k)).
11        (d) WILLAMETTE RIVER BASIN REVIEW REALLOCA-
12   TION STUDY.—The Secretary shall carry out the project for

13 water supply, Willamette River Basin Review Reallocation,
14 Oregon, authorized by section 401 of this Act, substantially
15 in accordance with the terms and conditions described in
16 the Report of the Chief of Engineers, dated December 18,
17 2019, with the following modifications:
18             (1) The Secretary shall meet the obligations of
19        the Corps of Engineers under the Endangered Species
20        Act of 1973 by complying with the June 2019 NMFS
21        Willamette Basin Review Study Biological Opinion
22        Reasonable and Prudent Alternative until such time,
23        if any, as it is modified or replaced, in whole or in
24        part, through the consultation process under section
25        7(a) of the Endangered Species Act of 1973.


       •S 1811 EAH
                                 320
 1             (2) The Secretary may reallocate not more than
 2        10 percent of overall storage in the joint conservation
 3        pool, as authorized by this Act and without further
 4        congressional action, if such reallocation is consistent
 5        with the ongoing consultation under section 7(a) of
 6        the Endangered Species Act of 1973 related to Wil-
 7        lamette Valley System operations.
 8             (3) The Secretary shall ensure that the revised
 9        reallocation is not reallocated from a single storage
10        use, does not seriously affect authorized project pur-
11        poses, and does not otherwise involve major oper-
12        ational changes to the project.
13        (e) CANO MARTIN PENA, SAN JUAN, PUERTO RICO.—
14 Section 5127 of the Water Resources Development Act of
15 2007     (121     Stat.   1242)     is   amended   by   striking
16 ‘‘$150,000,000’’ and inserting ‘‘$255,816,000’’.
17   SEC. 403. AUTHORIZATION OF PROJECTS BASED ON FEASI-

18                  BILITY STUDIES PREPARED BY NON-FEDERAL

19                  INTERESTS.

20        (a) IN GENERAL.—The Secretary is authorized to
21 carry out the following projects for water resources develop-
22 ment and conservation and other purposes, subject to sub-
23 section (b):
24             (1) FORT PIERCE, ST. LUCIE COUNTY, FLOR-
25        IDA.—The    project for hurricane and storm damage


      •S 1811 EAH
                                321
1       reduction, Fort Pierce, St. Lucie County, Florida, as
2       described in the review assessment of the Secretary, ti-
3       tled ‘‘Review Assessment of St. Lucie County, Florida
4       Fort Pierce Shore Protection Project Section 203 Inte-
5       grated Feasibility Study and Environmental Assess-
6       ment (June 2018)’’ and dated July 2018, at a total
7       cost of $33,107,639, and at an estimated total cost of
8       $97,958,972 for periodic nourishment over the 50-year
9       life of the project.
10            (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—
11      The project for navigation, Baptiste Collette Bayou,
12      Louisiana, as described in the review assessment of
13      the    Secretary,      titled   ‘‘Review   Assessment   of
14      Plaquemines Parish Government’s Section 203 Study
15      Baptiste Collette Bayou Navigation Channel Deep-
16      ening Project Integrated Feasibility Study and Envi-
17      ronmental Assessment (January 2017, Amended April
18      2018)’’ and dated June 2018, at a total cost of
19      $44,920,000.
20            (3) HOUMA NAVIGATION CANAL, LOUISIANA.—
21      The project for navigation, Houma Navigation Canal,
22      Louisiana, as described in the review assessment of
23      the Secretary, titled ‘‘Review Assessment of Houma
24      Navigation Canal Deepening Project Section 203 In-
25      tegrated Feasibility Report and DRAFT Environ-


     •S 1811 EAH
                             322
 1      mental Impact Statement (June 2018)’’ and dated
 2      July 2018, at a total cost of $253,458,000.
 3           (4) PORT    FOURCHON BELLE PASS CHANNEL,

 4      LOUISIANA.—The      project   for   navigation,     Port
 5      Fourchon Belle Pass Channel, Louisiana, as described
 6      in the review assessment of the Secretary, titled ‘‘Re-
 7      view Assessment of Port Fourchon Belle Pass Channel
 8      Deepening Project Section 203 Feasibility Study
 9      (January 2019, revised January 2020)’’ and dated
10      April 2020, at a total cost of $95,483,000.
11           (5) WILMINGTON HARBOR, NORTH CAROLINA.—
12      The project for navigation, Wilmington Harbor,
13      North Carolina, as described in the review assessment
14      of the Secretary, titled ‘‘Review Assessment of Wil-
15      mington Harbor, North Carolina Navigation Im-
16      provement Project Integrated Section 203 Study &
17      Environmental Report (February 2020)’’ and dated
18      May 2020, at a total cost of $834,093,000.
19           (6) CHACON     CREEK, TEXAS.—The         project for
20      flood risk management, ecosystem restoration, and
21      other purposes, Chacon Creek, Texas, as described in
22      the review assessment of the Secretary, titled ‘‘Review
23      Assessment of Chacon Creek, Texas Section 203 Inte-
24      grated Feasibility Report and DRAFT Environ-




     •S 1811 EAH
                              323
 1       mental Assessment (August 2018)’’ and dated Sep-
 2       tember 2018, at a total cost of $51,973,000.
 3       (b) REQUIREMENTS.—The Secretary may only carry
 4 out a project authorized under subsection (a)—
 5             (1) substantially in accordance with the applica-
 6       ble review assessment for the project submitted by the
 7       Secretary under section 203(c) of the Water Resources
 8       Development Act of 1986, as identified in subsection
 9       (a) of this section, and subject to such modifications
10       or conditions as the Secretary considers appropriate
11       and identifies in a final assessment that addresses the
12       concerns, recommendations, and conditions identified
13       by the Secretary in the applicable review assessment;
14       and
15             (2) after the Secretary transmits to the Com-
16       mittee on Transportation and Infrastructure of the
17       House of Representatives and the Committee on Envi-
18       ronment and Public Works of the Senate such final
19       assessment.
20        TITLE V—OTHER MATTERS
21   SEC. 501. UPDATE ON INVASIVE SPECIES POLICY GUID-

22                  ANCE.

23       (a) IN GENERAL.—The Secretary shall periodically
24 update the Invasive Species Policy Guidance, developed
25 under section 104 of the River and Harbor Act of 1958 (33


      •S 1811 EAH
                               324
 1 U.S.C. 610) and the Nonindigenous Aquatic Nuisance Pre-
 2 vention and Control Act of 1990 (16 U.S.C. 4701 et seq.),
 3 in accordance with the most recent National Invasive Spe-
 4 cies Council Management Plan developed pursuant to Exec-
 5 utive Order 13112.
 6       (b) INCLUSION.—The Secretary may include in the up-
 7 dated guidance invasive species specific efforts at federally
 8 authorized water resources development projects located
 9 in—
10            (1) high-altitude lakes; and
11            (2) the Tennessee and Cumberland River basins.
12   SEC. 502. AQUATIC INVASIVE SPECIES RESEARCH.

13       Section 1108 of the Water Resources Development Act
14 of 2018 (33 U.S.C. 2263a) is amended—
15            (1) in subsection (a)—
16                  (A) by striking ‘‘management’’ and insert-
17            ing ‘‘prevention, management,’’; and
18                  (B) by inserting ‘‘, elodea, quagga mussels,’’
19            after ‘‘Asian carp’’; and
20            (2) in subsection (b)—
21                  (A) by inserting ‘‘or could be impacted in
22            the future’’ after ‘‘impacted’’; and
23                  (B) by striking ‘‘Pacific’’ and all that fol-
24            lows through the period at the end and inserting
25            ‘‘Pacific, Arctic, and Gulf Coasts, the Great


      •S 1811 EAH
                               325
 1            Lakes, and reservoirs operated and maintained
 2            by the Secretary.’’.
 3   SEC. 503. TERRESTRIAL NOXIOUS WEED CONTROL PILOT

 4                  PROGRAM.

 5       (a) IN GENERAL.—The Secretary shall carry out a
 6 pilot program, in consultation with the Federal Interagency
 7 Committee for the Management of Noxious and Exotic
 8 Weeds, to identify and develop new and improved strategies
 9 for terrestrial noxious weed control on Federal land under
10 the jurisdiction of the Secretary.
11       (b) PARTNERSHIPS.—In carrying out the pilot pro-
12 gram under subsection (a), the Secretary shall act in part-
13 nership with such other individuals and entities as the Sec-
14 retary determines to be appropriate.
15       (c) COOPERATIVE AGREEMENTS.—The Secretary may
16 utilize cooperative agreements with county and State agen-
17 cies for the implementation of the pilot program under sub-
18 section (a).
19       (d) REPORT TO CONGRESS.—Not later than 2 years
20 after the date of enactment of this Act, the Secretary shall
21 provide to the Committee on Environment and Public
22 Works of the Senate and the Committee on Transportation
23 and Infrastructure of the House of Representatives a report
24 describing the new and improved strategies developed
25 through the pilot program under subsection (a).


      •S 1811 EAH
                                  326
 1   SEC.     504.    INVASIVE     SPECIES     RISK    ASSESSMENT,

 2                    PRIORITIZATION, AND MANAGEMENT.

 3          Section 528(f)(2) of the Water Resources Development
 4 Act of 1996 (110 Stat. 3771) is amended—
 5              (1) by redesignating subparagraphs (I) and (J)
 6          as subparagraphs (J) and (K), respectively;
 7              (2) by inserting after subparagraph (H) the fol-
 8          lowing:
 9                     ‘‘(I) shall, using existing amounts appro-
10              priated to the Task Force, develop and update,
11              as appropriate, a priority list of invasive species
12              that—
13                          ‘‘(i) reflects an assessment of ecological
14                     risk that the listed invasive species rep-
15                     resent;
16                          ‘‘(ii) includes populations of invasive
17                     plants and animals that—
18                               ‘‘(I) are significantly impacting
19                          the structure and function of ecological
20                          communities, native species, or habitat
21                          within the South Florida ecosystem; or
22                               ‘‘(II) demonstrate a strong poten-
23                          tial to reduce, obscure, or otherwise
24                          alter key indicators used to measure
25                          Everglades restoration progress; and


      •S 1811 EAH
                             327
 1                     ‘‘(iii) shall be used by the Task Force
 2                 and agencies and entities represented on the
 3                 Task Force to focus cooperative and collabo-
 4                 rative efforts—
 5                           ‘‘(I) to guide applied research;
 6                           ‘‘(II) to develop innovative strate-
 7                     gies and tools to facilitate improved
 8                     management, control, or eradication of
 9                     listed invasive species;
10                           ‘‘(III) to implement specific man-
11                     agement, control, or eradication activi-
12                     ties at the appropriate periodicity and
13                     intensity necessary to reduce or neu-
14                     tralize the impacts of listed invasive
15                     species, including the use of qualified
16                     skilled volunteers when appropriate;
17                     and
18                           ‘‘(IV) to develop innovative strate-
19                     gies and tools to prevent future intro-
20                     ductions of nonnative species;’’;
21            (3) in subparagraph (J) (as so redesignated), by
22      striking ‘‘ecosystem’’ and inserting ‘‘ecosystem, in-
23      cluding the activities described in subparagraph (I)’’;
24      and




     •S 1811 EAH
                                 328
1             (4) in clause (i) of subparagraph (K) (as so re-
2        designated), by inserting ‘‘, including the priority list
3        under subparagraph (I) and the activities described
4        in that subparagraph’’ after ‘‘Task Force’’.
 5   SEC. 505. INVASIVE SPECIES MITIGATION AND REDUCTION.

 6       Section 104 of the River and Harbor Act of 1958 (33
 7 U.S.C. 610) is amended—
 8            (1) in subsection (b)—
 9                  (A) in paragraph (1)—
10                       (i) in the matter preceding subpara-
11                  graph     (A),     by   striking    ‘‘this   section
12                  $110,000,000’’ and inserting ‘‘this section
13                  (except    for     subsections     (f)   and    (g))
14                  $130,000,000’’;
15                       (ii) in subparagraph (B), by striking
16                  ‘‘and’’ at the end;
17                       (iii) in subparagraph (C), by striking
18                  the period at the end and inserting a semi-
19                  colon; and
20                       (iv) by adding at the end the following:
21                  ‘‘(D) $30,000,000 shall be made available to
22            carry out subsection (d)(1)(A)(iv); and
23                  ‘‘(E) $10,000,000 shall be made available to
24            carry out subsection (d)(1)(A)(v).’’;




      •S 1811 EAH
                              329
 1                 (B) by redesignating paragraph (2) as
 2           paragraph (3);
 3                 (C) by inserting after paragraph (1) the fol-
 4           lowing:
 5           ‘‘(2) OTHER PROGRAMS.—
 6                 ‘‘(A) IN GENERAL.—There are authorized to
 7           be appropriated—
 8                      ‘‘(i) $10,000,000 for each of fiscal
 9                 years 2021 through 2024 to carry out sub-
10                 section (f); and
11                      ‘‘(ii) $50,000,000 for each of fiscal
12                 years 2021 through 2024 to carry out sub-
13                 section (g)(2).
14                 ‘‘(B) INVASIVE PLANT SPECIES PILOT PRO-
15           GRAM.—There is authorized to be appropriated

16           to the Secretary of the Interior, acting through
17           the Director of the United States Fish and Wild-
18           life Service, $10,000,000 to carry out subsection
19           (g)(3).’’; and
20                 (D) in paragraph (3) (as so redesignated),
21           by inserting ‘‘or (2)(A)’’ after ‘‘paragraph (1)’’;
22           (2) in subsection (d)—
23                 (A) in the subsection heading, by inserting
24           ‘‘AND DECONTAMINATION’’ after ‘‘INSPECTION’’;
25                 (B) in paragraph (1)—


     •S 1811 EAH
                                 330
 1                         (i) in subparagraph (A)—
 2                              (I) in the subparagraph heading,
3                          by inserting ‘‘AND DECONTAMINATION’’
 4                         after ‘‘INSPECTION’’;
 5                              (II) in clause (ii), by striking
 6                         ‘‘and’’ at the end;
 7                              (III) in clause (iii), by striking
 8                         ‘‘Arizona River Basins.’’ and inserting
 9                         ‘‘Arkansas River Basins;’’; and
10                              (IV) by adding at the end the fol-
11                         lowing:
12                         ‘‘(iv) to protect the Russian River
13                 Basin, California; and
14                         ‘‘(v) to protect basins and watersheds
15                 that adjoin an international border between
16                 the United States and Canada.’’; and
17                         (ii) by striking subparagraph (B) and
18                 inserting the following:
19                 ‘‘(B)     LOCATIONS.—The        Secretary   shall
20           place watercraft inspection and decontamination
21           stations under subparagraph (A) at locations
22           with the highest likelihood of preventing the
23           spread of aquatic invasive species into and out
24           of waters of the United States, as determined by




     •S 1811 EAH
                               331
1             the Secretary in consultation with the Governors
2             and entities described in paragraph (3).’’;
3                   (C) in paragraph (3)(A), by striking ‘‘(iii)’’
4             and inserting ‘‘(v)’’; and
5                   (D) by striking ‘‘watercraft inspection sta-
6             tions’’ each place it appears and inserting
7             ‘‘watercraft inspection and decontamination sta-
8             tions’’; and
9             (3) by adding at the end the following:
10       ‘‘(f) INVASIVE SPECIES MANAGEMENT PILOT PRO-
11   GRAM.—

12            ‘‘(1) DEFINITION OF INVASIVE SPECIES.—In this
13       subsection, the term ‘invasive species’ has the meaning
14       given the term in section 1 of Executive Order 13112
15       (64 Fed. Reg. 6183; relating to invasive species (Feb-
16       ruary 3, 1999)) (as amended by section 2 of Execu-
17       tive Order 13751 (81 Fed. Reg. 88609; relating to
18       safeguarding the Nation from the impacts of invasive
19       species (December 5, 2016))).
20            ‘‘(2) DEVELOPMENT OF PLANS.—The Secretary,
21       in coordination with the Aquatic Nuisance Species
22       Task Force, shall carry out a pilot program under
23       which the Secretary shall collaborate with States in
24       the Upper Missouri River Basin in developing vol-
25       untary aquatic invasive species management plans to


      •S 1811 EAH
                             332
 1      mitigate the effects of invasive species on public infra-
 2      structure facilities located on reservoirs of the Corps
 3      of Engineers in those States.
 4           ‘‘(3) MANAGEMENT PLAN.—
 5                 ‘‘(A) IN GENERAL.—The Secretary, in con-
 6           sultation with the Governor of each State in the
 7           Upper Missouri River Basin that elects to par-
 8           ticipate in the pilot program, shall prepare a
 9           management plan, or update or expand an exist-
10           ing plan, for each participating State that iden-
11           tifies public infrastructure facilities located on
12           reservoirs of the Corps of Engineers in those
13           States that—
14                      ‘‘(i) are affected by aquatic invasive
15                 species; and
16                      ‘‘(ii) need financial and technical as-
17                 sistance in order to maintain operations.
18                 ‘‘(B) USE OF EXISTING PLANS.—In devel-
19           oping a management plan under subparagraph
20           (A), the Secretary shall consider a management
21           plan submitted by a participating State under
22           section 1204(a) of the Nonindigenous Aquatic
23           Nuisance Prevention and Control Act of 1990
24           (16 U.S.C. 4724(a)).




     •S 1811 EAH
                                 333
 1           ‘‘(4) TERMINATION OF AUTHORITY.—The author-
 2      ity provided under this subsection shall terminate on
 3      September 30, 2024.
 4      ‘‘(g) INVASIVE SPECIES PREVENTION, CONTROL, AND
 5 ERADICATION.—
 6           ‘‘(1) DEFINITION OF INVASIVE SPECIES.—In this
 7      subsection, the term ‘invasive species’ has the meaning
 8      given the term in section 1 of Executive Order 13112
 9      (64 Fed. Reg. 6183; relating to invasive species (Feb-
10      ruary 3, 1999)) (as amended by section 2 of Execu-
11      tive Order 13751 (81 Fed. Reg. 88609; relating to
12      safeguarding the Nation from the impacts of invasive
13      species (December 5, 2016))).
14           ‘‘(2) INVASIVE SPECIES PARTNERSHIPS.—
15                   ‘‘(A) IN    GENERAL.—The   Secretary may
16           enter into partnerships with applicable States
17           and other Federal agencies to carry out actions
18           to prevent the introduction of, control, or eradi-
19           cate,    to   the   maximum   extent   practicable,
20           invasive species that adversely impact water
21           quantity or water quality in the Platte River
22           Basin, the Upper Colorado River Basin, the
23           Upper Snake River Basin, and the Upper Mis-
24           souri River Basin.




     •S 1811 EAH
                              334
 1                 ‘‘(B) PRIORITIZATION.—In selecting actions
 2           to carry out under a partnership under subpara-
 3           graph (A), the Secretary shall give priority to
 4           projects that are intended to control or eradicate
 5           the Russian olive (Elaeagnus angustifolia) or
 6           saltcedar (of the genus Tamarix).
7            ‘‘(3) INVASIVE    PLANT      SPECIES    PILOT    PRO-

8       GRAM.—

9                  ‘‘(A) DEFINITIONS.—In this paragraph:
10                     ‘‘(i) ELIGIBLE ENTITY.—The term ‘eli-
11                 gible entity’ means a partnership between
12                 or among 2 or more entities that—
13                          ‘‘(I) includes—
14                                  ‘‘(aa) at least 1 flood control
15                          district; and
16                                  ‘‘(bb) at least 1 city, county,
17                          township, town, borough, parish,
18                          village, or other general purpose
19                          political subdivision of a State or
20                          Indian Tribe (as defined in sec-
21                          tion 4 of the Indian Self-Deter-
22                          mination and Education Assist-
23                          ance Act (25 U.S.C. 5304)); and
24                          ‘‘(II) may include any other enti-
25                     ty (such as a nonprofit organization or


     •S 1811 EAH
                               335
 1                     institution of higher education), as de-
 2                     termined by the Secretary.
 3                     ‘‘(ii) INVASIVE PLANT SPECIES.—The
 4                 term ‘invasive plant species’ means a plant
 5                 that is nonnative to the ecosystem under
 6                 consideration, the introduction of which
 7                 causes or is likely to cause economic harm
 8                 or harm to human health.
 9                 ‘‘(B) PILOT PROGRAM.—The Secretary of
10           the Interior, acting through the Director of the
11           United States Fish and Wildlife Service, shall es-
12           tablish a pilot program under which such Sec-
13           retary shall work with eligible entities to carry
14           out activities—
15                     ‘‘(i) to remove invasive plant species in
16                 riparian areas that contribute to drought
17                 conditions in—
18                          ‘‘(I) the Lower Colorado River
19                     Basin;
20                          ‘‘(II)    the    Rio   Grande   River
21                     Basin;
22                          ‘‘(III)    the   Texas   Gulf   Coast
23                     Basin; and
24                          ‘‘(IV)    the     Arkansas-White-Red
25                     Basin;


     •S 1811 EAH
                              336
 1                      ‘‘(ii) where appropriate, to replace the
 2                 invasive plant species described in clause (i)
 3                 with ecologically suitable native species; and
 4                      ‘‘(iii) to maintain and monitor ripar-
 5                 ian areas in which activities are carried out
 6                 under clauses (i) and (ii).
 7                 ‘‘(C) REPORT      TO   CONGRESS.—Not        later
 8           than 18 months after the date of enactment of
 9           this subsection, the Secretary of the Interior, act-
10           ing through the Director of the United States
11           Fish and Wildlife Service, shall submit to the
12           Committee on Environment and Public Works of
13           the Senate and the Committee on Transportation
14           and Infrastructure of the House of Representa-
15           tives a report describing the implementation of
16           the pilot program.
17                 ‘‘(D) TERMINATION       OF AUTHORITY.—The

18           authority provided under this paragraph shall
19           terminate on September 30, 2024.
20           ‘‘(4) COST SHARE.—The Federal share of an ac-
21      tion carried out under a partnership under para-
22      graph (2) or an activity carried out under the pilot
23      program under paragraph (3) shall not exceed 80 per-
24      cent of the total cost of the action or activity.’’.




     •S 1811 EAH
                              337
 1   SEC. 506. AQUATIC INVASIVE SPECIES PREVENTION.

 2       Section 1039(b) of the Water Resources Reform and
 3 Development Act of 2014 (16 U.S.C. 4701 note) is amend-
 4 ed—
 5            (1) in paragraph (1)—
 6                  (A) in the paragraph heading, by striking
7             ‘‘UPPER MISSISSIPPI AND OHIO RIVER BASINS
8             AND TRIBUTARIES’’     and inserting ‘‘MISSISSIPPI
9             RIVER AND TRIBUTARIES, INCLUDING SUB-BA-

10            SINS’’;

11                  (B) in subparagraph (A), by striking
12            ‘‘Upper Mississippi and Ohio River basins and
13            tributaries’’ and inserting ‘‘Mississippi River
14            and tributaries, including the 6 sub-basins of the
15            River,’’; and
16                  (C) in subparagraph (B), by striking ‘‘and
17            the document prepared’’ and all that follows
18            through ‘‘February 2012.’’ and inserting ‘‘the
19            Mississippi River Basin Asian Carp Control
20            Strategy Framework, and the Asian Carp Re-
21            gional Coordinating Committee’s Asian Carp
22            Action Plan.’’; and
23            (2) in paragraph (2)—
24                  (A) in subparagraph (A)—




      •S 1811 EAH
                                 338
 1                          (i) by striking ‘‘December 31 of each
 2                   year’’ and inserting ‘‘December 31, 2020,
 3                   and biennially thereafter’’; and
 4                          (ii) by striking ‘‘Upper Mississippi
 5                   and Ohio River basins and tributaries’’ and
 6                   inserting ‘‘Mississippi River and tribu-
 7                   taries, including the 6 sub-basins of the
 8                   River’’; and
 9                   (B) in subparagraph (B)—
10                          (i) in clause (i), by striking ‘‘Upper
11                   Mississippi and Ohio River basins and trib-
12                   utaries’’ and inserting ‘‘Mississippi River
13                   and tributaries, including the 6 sub-basins
14                   of the River,’’; and
15                          (ii) in clause (ii), by striking ‘‘Upper
16                   Mississippi and Ohio River basins and trib-
17                   utaries’’ and inserting ‘‘Mississippi River
18                   and tributaries, including the 6 sub-basins
19                   of the River’’.
20   SEC. 507. INVASIVE SPECIES IN ALPINE LAKES PILOT PRO-

21                  GRAM.

22       (a) ESTABLISHMENT.—The Secretary of the Interior,
23 acting through the Director of the United States Fish and
24 Wildlife Service, shall establish a pilot program (referred
25 to in this section as the ‘‘pilot program’’) to develop and


      •S 1811 EAH
                             339
 1 carry out effective measures necessary to prevent, control,
 2 or eradicate aquatic invasive species in alpine lakes that
 3 are not located within a unit of the National Park System.
 4       (b) PARTNERSHIPS.—The Secretary of the Interior,
 5 acting through the Director of the United States Fish and
 6 Wildlife Service, shall offer to enter into a partnership to
 7 carry out the pilot program with—
 8            (1) any relevant partnering Federal agency; and
 9            (2) any relevant compact agency organized with
10       the consent of Congress under article I, section 10 of
11       the Constitution of the United States.
12       (c) AUTHORIZATION OF APPROPRIATIONS.—There is
13 authorized to be appropriated to carry out the pilot pro-
14 gram $25,000,000 for the period of fiscal years 2022
15 through 2024.
16   SEC. 508. MURDER HORNET ERADICATION PILOT PROGRAM.

17       (a) GRANT AUTHORITY.—The Secretary of the Inte-
18 rior, acting through the Director of the Fish and Wildlife
19 Service, and in consultation with all relevant Federal agen-
20 cies, shall establish a pilot program to provide financial
21 assistance to States for management, research, and public
22 education activities necessary to—
23            (1) eradicate the Asian giant hornet; and
24            (2) restore bee populations damaged by the Asian
25       giant hornet.


      •S 1811 EAH
                              340
 1       (b) ELIGIBILITY.—A State is eligible to receive finan-
 2 cial assistance under this section if the State has dem-
 3 onstrated to the Secretary of the Interior sufficient need to
 4 implement measures to eradicate the Asian giant hornet.
 5       (c) COST SHARING.—
 6            (1) FEDERAL SHARE.—The Federal share of the
 7       costs of activities carried out under the pilot program
 8       may not exceed 75 percent of the total costs of such
 9       activities.
10            (2) IN-KIND CONTRIBUTIONS.—The non-Federal
11       share of the costs of activities carried out under the
12       pilot program may be provided in the form of in-kind
13       contributions of materials or services.
14       (d) LIMITATION ON ADMINISTRATIVE EXPENSES.—Not
15 more than 5 percent of financial assistance provided by the
16 Secretary of the Interior under this section may be used
17 for administrative expenses.
18       (e) AUTHORIZATION OF APPROPRIATIONS.—There is
19 authorized to be appropriated to the Secretary of the Inte-
20 rior to carry out the pilot program $4,000,000 for each of
21 fiscal years 2021 through 2025.
22       (f) DEFINITIONS.—In this section:
23            (1) ASIAN GIANT HORNET.—The term ‘‘Asian
24       giant hornet’’ means a Vespa mandarinia.




      •S 1811 EAH
                               341
 1            (2) STATE.—The term ‘‘State’’ means each of the
 2       several States, the District of Columbia, and the terri-
 3       tories and insular possessions of the United States.
 4       (g) SUNSET.—The authority under this section shall
 5 terminate on the date that is 5 years after the date of enact-
 6 ment of this Act.
 7   SEC. 509. ASIAN CARP PREVENTION AND CONTROL PILOT

 8                  PROGRAM.

 9       (a) CORPS OF ENGINEERS ASIAN CARP PREVENTION
10 PILOT PROGRAM.—
11            (1) IN GENERAL.—The Secretary, in conjunction
12       with the Tennessee Valley Authority and other rel-
13       evant Federal agencies, shall carry out an Asian carp
14       prevention pilot program to carry out projects to
15       manage and prevent the spread of Asian carp using
16       innovative technologies, methods, and measures.
17            (2) PROJECT SELECTION.—
18                   (A) LOCATION.—Each project under the
19            pilot program shall be carried out in a river sys-
20            tem or reservoir in the Cumberland River Water-
21            shed or Tennessee River Watershed in which
22            Asian carp populations are expanding or have
23            been documented.




      •S 1811 EAH
                               342
 1                 (B) CONSULTATION.—In selecting projects
 2           to carry out under the pilot program, the Sec-
 3           retary shall consult with—
 4                       (i) applicable Federal, State, and local
 5                 agencies;
 6                       (ii) institutions of higher education;
 7                 and
 8                       (iii) relevant private organizations, in-
 9                 cluding nonprofit organizations.
10                 (C) LIMITATIONS.—
11                       (i) NUMBER OF PROJECTS.—The Sec-
12                 retary may select not more than 10 projects
13                 to carry out under the pilot program.
14                       (ii) DEADLINE.—Not later than Sep-
15                 tember 30, 2024, the Secretary shall com-
16                 plete projects selected to be carried out
17                 under the pilot program.
18           (3) BEST PRACTICES.—In carrying out the pilot
19      program, to the maximum extent practicable, the Sec-
20      retary shall consider existing best practices, such as
21      those described in the document of the Asian Carp
22      Working Group of the Aquatic Nuisance Species Task
23      Force entitled ‘‘Management and Control Plan for
24      Bighead, Black, Grass, and Silver Carps in the
25      United States’’ and dated November 2007.


     •S 1811 EAH
                             343
 1           (4) COST-SHARE.—
 2                 (A) IN GENERAL.—The Federal share of the
 3           costs of a project carried out under the program
 4           may not exceed 75 percent of the total costs of
 5           the project.
 6                 (B) OPERATION, MAINTENANCE, REHABILI-
 7           TATION, AND REPAIR.—After the completion of a

 8           project under the pilot program, the Federal
 9           share of the costs for operation, maintenance, re-
10           habilitation, and repair of the project shall be
11           100 percent.
12           (5) MEMORANDUM OF AGREEMENT.—For projects
13      carried out in reservoirs owned or managed by the
14      Tennessee Valley Authority, the Secretary and the
15      Tennessee Valley Authority shall execute a memo-
16      randum of agreement establishing the framework for
17      a partnership and the terms and conditions for shar-
18      ing expertise and resources.
19           (6) PAYMENTS.—The Secretary is authorized to
20      accept and expend funds from the Tennessee Valley
21      Authority to complete any work under this section at
22      a reservoir owned or managed by the Tennessee Valley
23      Authority.
24           (7) REPORT.—Not later than 2 years after the
25      date of enactment of this Act, and 2 years thereafter,


     •S 1811 EAH
                                344
 1       the Secretary shall submit to Congress a report de-
 2       scribing the results of the pilot program, including an
 3       analysis of the effectiveness of the innovative tech-
 4       nologies, methods, and measures used in projects car-
 5       ried out under the pilot program at preventing the
 6       spread, or managing the eradicating of, Asian carp.
 7            (8)    AUTHORIZATION    OF   APPROPRIATIONS.—

 8       There is authorized to be appropriated to carry out
 9       this subsection $25,000,000, to remain available until
10       expended.
11       (b) FISH AND WILDLIFE SERVICE ASIAN CARP ERADI-
12   CATION PROGRAM.—

13            (1) ESTABLISHMENT.—The Secretary of the Inte-
14       rior, acting through the Director of the United States
15       Fish and Wildlife Service, shall establish a program
16       to provide financial assistance to States to implement
17       measures, including for management, research, and
18       public education activities, necessary to eradicate the
19       Asian carp.
20            (2) ELIGIBILITY.—A State is eligible to receive
21       financial assistance under this subsection if such
22       State has demonstrated to the Secretary of the Inte-
23       rior sufficient need to implement measures to eradi-
24       cate the Asian carp.




      •S 1811 EAH
                              345
 1           (3) PRIORITY.—In providing financial assist-
 2      ance under the program, the Secretary of the Interior
 3      shall give priority to States in the Cumberland River
 4      Watershed or the Tennessee River Watershed in which
 5      Asian carp populations are expanding or have been
 6      documented.
 7           (4) COST SHARING.—
 8                  (A) FEDERAL SHARE.—The Federal share
 9           of the costs of activities carried out under the
10           program may not exceed 80 percent of the total
11           costs of such activities.
12                  (B) IN-KIND     CONTRIBUTIONS.—The      non-
13           Federal share of the costs of activities carried out
14           under the program may be provided in the form
15           of in-kind contributions of materials or services.
16           (5)    LIMITATION      ON    ADMINISTRATIVE     EX-

17      PENSES.—Not more than 5 percent of financial as-

18      sistance provided by the Secretary of the Interior
19      under this subsection may be used for administrative
20      expenses.
21           (6)    AUTHORIZATION        OF   APPROPRIATIONS.—

22      There is authorized to be appropriated to the Sec-
23      retary of the Interior to carry out this subsection
24      $4,000,000 for each of fiscal years 2021 through 2025.




     •S 1811 EAH
                              346
 1   SEC. 510. INVASIVE SPECIES IN NONCONTIGUOUS STATES

 2                  AND TERRITORIES PILOT PROGRAM.

 3       (a) ESTABLISHMENT.—The Secretary of the Interior,
 4 acting through the Director of the United States Fish and
 5 Wildlife Service, shall establish a pilot program to carry
 6 out measures necessary to prevent, control, or eradicate
 7 invasive species in culturally significant forested water-
 8 sheds in noncontiguous States and territories of the United
 9 States in which the Corps of Engineers is carrying out flood
10 risk management projects.
11       (b) IMPLEMENTATION.—The Secretary of the Interior,
12 acting through the Director of the United States Fish and
13 Wildlife Service, is encouraged to carry out the measures
14 described in subsection (a) in consultation with—
15            (1) States, any territory or possession of the
16       United States, and units of local government, includ-
17       ing federally recognized Indian Tribes (as defined in
18       section 4 of the Indian Self-Determination and Edu-
19       cation Assistance Act (25 U.S.C. 5304)); and
20            (2) nonprofit organizations with knowledge of,
21       and experience in, forested watershed management,
22       including nonprofit organizations with a primary
23       purpose of serving and partnering with indigenous
24       communities.
25       (c) AUTHORIZATION OF APPROPRIATIONS.—There is
26 authorized to be appropriated to carry out the pilot pro-
      •S 1811 EAH
                             347
 1 gram under subsection (a) $25,000,000 for the period of fis-
 2 cal years 2022 through 2024.
 3   SEC. 511. SOIL MOISTURE AND SNOWPACK MONITORING.

 4       (a) INSTALLATION OF NETWORK.—
 5            (1) IN GENERAL.—In accordance with the activi-
 6       ties required under section 4003(a) of the Water Re-
 7       sources Reform and Development Act of 2014 (128
 8       Stat. 1310; 130 Stat. 1676), and to support the goals
 9       of the Weather Research and Forecasting Innovation
10       Act of 2017 (Public Law 115–25) and the National
11       Integrated Drought Information System Reauthoriza-
12       tion Act of 2018 (Public Law 115–423), the Sec-
13       retary, in coordination with the Administrator of the
14       National Oceanic and Atmospheric Administration
15       (referred to in this section as the ‘‘Administrator’’),
16       the Chief of the Natural Resources Conservation Serv-
17       ice, the Director of the United States Geological Sur-
18       vey, and the Commissioner of Reclamation, shall con-
19       tinue installation of a network of soil moisture and
20       plains snowpack monitoring stations, and modifica-
21       tion of existing stations, in the Upper Missouri River
22       Basin.
23            (2) REQUIREMENTS.—In carrying out installa-
24       tion and modification activities under paragraph (1),
25       the Secretary—


      •S 1811 EAH
                               348
1                  (A) may continue to enter into agreements,
2            including cooperative agreements, with State
3            mesonet programs for purposes of installing new
4            stations or modifying existing stations;
5                  (B) shall transfer ownership and all respon-
6            sibilities for operation and maintenance of new
7            stations to the respective State mesonet program
8            for the State in which the monitoring station is
9            located on completion of installation of the sta-
10           tion; and
11                 (C) shall establish, in consultation with the
12           Administrator, requirements and standards for
13           the installation of new stations and modification
14           of existing stations to ensure seamless data inte-
15           gration into—
16                       (i) the National Mesonet Program;
17                       (ii) the National Coordinated Soil
18                 Moisture Network; and
19                       (iii) other relevant networks.
20           (3)   AUTHORIZATION        OF   APPROPRIATIONS.—

21      There is authorized to be appropriated to carry out
22      this subsection, in addition to any other funds au-
23      thorized to be appropriated for the installation of a
24      network of soil moisture and plains snowpack moni-
25      toring stations or the modification of existing stations


     •S 1811 EAH
                             349
1       in the Upper Missouri River Basin, $7,000,000 for
2       each of fiscal years 2021 through 2025.
 3      (b) SOIL MOISTURE       AND   SNOWPACK MONITORING
4 PILOT PROGRAM.—
 5           (1) IN GENERAL.—Not later than 180 days after
 6      the date of the enactment of this Act, the Adminis-
 7      trator shall establish within the National Mesonet
 8      Program a pilot program for the acquisition and use
 9      of data generated by the network described in sub-
10      section (a).
11           (2) REQUIREMENTS.—In establishing the pilot
12      program under paragraph (1), the Administrator
13      shall—
14                 (A) enter into agreements with State
15           mesonet programs in the Upper Missouri River
16           Basin to acquire data generated by the network
17           described in subsection (a) that—
18                     (i) are similar to the agreements in ef-
19                 fect as of the date of the enactment of this
20                 Act with States under the National Mesonet
21                 Program; and
22                     (ii) allow for sharing of data with
23                 other Federal agencies and with institutions
24                 engaged in federally supported research, in-




     •S 1811 EAH
                                350
1                  cluding the United States Drought Monitor,
2                  as appropriate and feasible;
3                  (B) in coordination with the Secretary, the
4            Chief of the Natural Resources Conservation
5            Service, the Director of the United States Geo-
6            logical Survey, and the Commissioner of Rec-
7            lamation, gather data from the operation of the
8            network to inform ongoing efforts of the National
9            Oceanic and Atmospheric Administration in
10           support of—
11                         (i) the National Integrated Drought
12                 Information System, including the National
13                 Coordinated Soil Moisture Network;
14                         (ii) the United States Drought Mon-
15                 itor;
16                         (iii) the National Water Model and
17                 other relevant national modeling efforts;
18                         (iv) validation, verification, and cali-
19                 bration of satellite-based, in situ, and other
20                 remote sensing activities and output prod-
21                 ucts;
22                         (v) flood risk and water resources mon-
23                 itoring initiatives by the Secretary and the
24                 Commissioner; and




     •S 1811 EAH
                             351
 1                     (vi) any other programs or initiatives
 2                 the Administrator considers appropriate;
 3                 (C) at the request of State mesonet pro-
 4           grams, or as the Administrator considers appro-
 5           priate, provide technical assistance to such pro-
 6           grams under the pilot program under paragraph
 7           (1) to ensure proper data requirements; and
 8                 (D) ensure an appropriate mechanism for
 9           quality control and quality assurance is em-
10           ployed for the data acquired under the pilot pro-
11           gram, such as the Meteorological Assimilation
12           Data Ingest System.
13           (3) STUDY REQUIRED.—
14                 (A) IN GENERAL.—Not later than 1 year
15           after the date of the enactment of this Act, the
16           Administrator shall initiate a study of the pilot
17           program required by paragraph (1) to evaluate
18           the data generated by the network described in
19           subsection (a) and the applications of that data
20           to programs and initiatives described in para-
21           graph (2)(B).
22                 (B) ELEMENTS.—The study required by
23           subparagraph (A) shall include an assessment
24           of—




     •S 1811 EAH
                                352
 1                         (i) the contribution of the soil mois-
 2                 ture, snowpack, and other relevant data
 3                 generated by the network described in sub-
 4                 section (a) to weather, subseasonal and sea-
 5                 sonal, and climate forecasting products on
 6                 the local, regional, and national levels;
 7                         (ii) the enhancements made to the Na-
 8                 tional Integrated Drought Information Sys-
 9                 tem, the National Water Model, and the
10                 United States Drought Monitor, and other
11                 relevant national modeling efforts, using
12                 data and derived data products generated
13                 by the network;
14                         (iii) the contribution of data generated
15                 by the network to remote sensing products
16                 and approaches;
17                         (iv) the viability of the ownership and
18                 operational structure of the network; and
19                         (v) any other matters the Adminis-
20                 trator considers appropriate, in coordina-
21                 tion with the Secretary, the Chief of the
22                 Natural Resources Conservation Service, the
23                 Director of the United States Geological
24                 Survey, and the Commissioner of Reclama-
25                 tion.


     •S 1811 EAH
                             353
 1           (4) REPORT REQUIRED.—Not later than 4 years
 2      after the date of the enactment of this Act, the Admin-
 3      istrator shall submit to the appropriate congressional
 4      committees a report—
 5                 (A) setting forth the findings of the study
 6           required by paragraph (3); and
 7                 (B) making recommendations based on
 8           those findings to improve weather, subseasonal,
 9           seasonal, and climate monitoring nationally.
10           (5)    GOVERNMENT      ACCOUNTABILITY      OFFICE

11      AUDIT.—

12                 (A) IN GENERAL.—Not later than 60 days
13           after the report required by paragraph (4) is
14           submitted, the Comptroller General of the United
15           States shall initiate an audit to evaluate that re-
16           port and determine whether—
17                     (i) the Administrator, in conducting
18                 the pilot program under paragraph (1), has
19                 utilized the relevant data generated by the
20                 network described in subsection (a) in the
21                 manner most beneficial to the programs and
22                 initiatives described in paragraph (2)(B);
23                     (ii) the acquisition agreements entered
24                 into under paragraph (2)(A) with State




     •S 1811 EAH
                              354
 1                 mesonet programs fully comply with the re-
 2                 quirements of that paragraph; and
 3                      (iii) the heads of other agencies, in-
 4                 cluding the Secretary, the Chief of the Nat-
 5                 ural Resources Conservation Service, the
 6                 Director of the United States Geological
 7                 Survey, and the Commissioner of Reclama-
 8                 tion, are utilizing the data generated by the
 9                 network to better inform and improve the
10                 missions of those agencies.
11                 (B) REPORT       REQUIRED.—Not    later than
12           270 days after initiating the audit required by
13           subparagraph (A), the Comptroller General shall
14           submit to the appropriate congressional commit-
15           tees a report setting forth the findings of the
16           audit.
17           (6) APPROPRIATE CONGRESSIONAL COMMITTEES
18      DEFINED.—In this subsection, the term ‘‘appropriate

19      congressional committees’’ means—
20                 (A) the Committee on Commerce, Science,
21           and Transportation, the Committee on Environ-
22           ment and Public Works, and the Committee on
23           Energy and Natural Resources of the Senate;
24           and




     •S 1811 EAH
                              355
 1                   (B) the Committee on Transportation and
 2             Infrastructure, the Committee on Science, Space,
 3             and Technology, and the Committee on Natural
 4             Resources of the House of Representatives.
 5   SEC. 512. GREAT LAKES ST. LAWRENCE SEAWAY DEVELOP-

 6                  MENT CORPORATION.

 7         (a) RENAMING THE SAINT LAWRENCE SEAWAY DE-
 8   VELOPMENT CORPORATION.—The Act of May 13, 1954 (33

 9 U.S.C. 981 et seq.) is amended—
10             (1) in section 1 (33 U.S.C. 981), by striking
11         ‘‘Saint Lawrence Seaway Development Corporation’’
12         and inserting ‘‘Great Lakes St. Lawrence Seaway De-
13         velopment Corporation’’; and
14             (2) in section 2(b) (33 U.S.C. 982(b)), by strik-
15         ing ‘‘Saint Lawrence Seaway Development Corpora-
16         tion’’ and inserting ‘‘Great Lakes St. Lawrence Sea-
17         way Development Corporation’’.
18         (b) REFERENCES.—Any reference to the Saint Law-
19 rence Seaway Development Corporation in any law, regula-
20 tion, document, record, Executive order, or other paper of
21 the United States shall be deemed to be a reference to the
22 Great Lakes St. Lawrence Seaway Development Corpora-
23 tion.
24         (c) TECHNICAL AND CONFORMING AMENDMENTS.—




      •S 1811 EAH
                              356
 1           (1) TITLE 5.—Section 5315 of title 5, United
 2      States Code, is amended by striking ‘‘Saint Lawrence
 3      Seaway Development Corporation’’ and inserting
 4      ‘‘Great Lakes St. Lawrence Seaway Development Cor-
 5      poration’’.
 6           (2) TITLE 18.—Section 2282B of title 18, United
 7      States Code, is amended by striking ‘‘Saint Lawrence
 8      Seaway Development Corporation’’ and inserting
 9      ‘‘Great Lakes St. Lawrence Seaway Development Cor-
10      poration’’.
11           (3)      INTERNAL      REVENUE    CODE.—Section

12      9505(a)(2) of the Internal Revenue Code of 1986 (26
13      U.S.C. 9505(a)(2)) is amended by striking ‘‘Saint
14      Lawrence Seaway Development Corporation’’ and in-
15      serting ‘‘Great Lakes St. Lawrence Seaway Develop-
16      ment Corporation’’.
17           (4) TITLE 31.—Section 9101(3)(K) of title 31,
18      United States Code, is amended by striking ‘‘Saint
19      Lawrence Seaway Development Corporation’’ and in-
20      serting ‘‘Great Lakes St. Lawrence Seaway Develop-
21      ment Corporation’’.
22           (5) WATER RESOURCES DEVELOPMENT ACT OF
23      1986.—The Water Resources Development Act of 1986

24      (33 U.S.C. 2211 et seq.) is amended—




     •S 1811 EAH
                              357
1                  (A) in section 206 (33 U.S.C. 2234), by
2            striking ‘‘Saint Lawrence Seaway Development
3            Corporation’’ and inserting ‘‘Great Lakes St.
4            Lawrence Seaway Development Corporation’’;
5                  (B)   in   section   210(a)(1)   (33   U.S.C.
6            2238(a)(1)), by striking ‘‘Saint Lawrence Sea-
7            way Development Corporation’’ and inserting
8            ‘‘Great Lakes St. Lawrence Seaway Development
9            Corporation’’;
10                 (C)   in   section   214(2)(B)   (33   U.S.C.
11           2241(2)(B)), by striking ‘‘Saint Lawrence Sea-
12           way Development Corporation’’ and inserting
13           ‘‘Great Lakes St. Lawrence Seaway Development
14           Corporation’’; and
15                 (D) in section 1132(b) (33 U.S.C. 2309(b)),
16           by striking ‘‘Saint Lawrence Seaway Develop-
17           ment Corporation’’ and inserting ‘‘Great Lakes
18           St. Lawrence Seaway Development Corporation’’
19           each place it appears.
20           (6) TITLE 46.—Title 46, United States Code, is
21      amended—
22                 (A) in section 2109, by striking ‘‘Saint
23           Lawrence Seaway Development Corporation’’
24           and inserting ‘‘Great Lakes St. Lawrence Sea-
25           way Development Corporation’’;


     •S 1811 EAH
                              358
 1                 (B) in section 8103(g), by striking ‘‘Saint
 2           Lawrence Seaway Development Corporation’’
 3           and inserting ‘‘Great Lakes St. Lawrence Sea-
 4           way Development Corporation’’;
 5                 (C) in section 8503(c), by striking ‘‘Saint
 6           Lawrence Seaway Development Corporation’’
 7           and inserting ‘‘Great Lakes St. Lawrence Sea-
 8           way Development Corporation’’;
 9                 (D) in section 55112(a)(3), by striking ‘‘St.
10           Lawrence Seaway Development Corporation’’
11           and inserting ‘‘Great Lakes St. Lawrence Sea-
12           way Development Corporation’’;
13                 (E) in section 55331(3), by striking ‘‘Saint
14           Lawrence Seaway Development Corporation’’
15           and inserting ‘‘Great Lakes St. Lawrence Sea-
16           way Development Corporation’’; and
17                 (F) in section 70032, by striking ‘‘Saint
18           Lawrence Seaway Development Corporation’’
19           and inserting ‘‘Great Lakes St. Lawrence Sea-
20           way Development Corporation’’ each place it ap-
21           pears.
22           (7) TITLE 49.—
23                 (A) IN GENERAL.—Title 49, United States
24           Code, is amended—
25                     (i) in section 110—


     •S 1811 EAH
                                       359
 1                                   (I) in the heading, by striking
 2                             ‘‘Saint Lawrence Seaway De-
 3                             velopment Corporation’’ and in-
 4                             serting ‘‘Great Lakes St. Law-
 5                             rence         Seaway           Development
 6                             Corporation’’; and
 7                                   (II) in subsection (a), by striking
 8                             ‘‘Saint Lawrence Seaway Development
 9                             Corporation’’ and inserting ‘‘Great
10                             Lakes St. Lawrence Seaway Develop-
11                             ment Corporation’’; and
12                             (ii) in section 6314(c)(2)(G), by strik-
13                      ing ‘‘Saint Lawrence Seaway Development
14                      Corporation’’ and inserting ‘‘Great Lakes
15                      St. Lawrence Seaway Development Cor-
16                      poration’’.
17                      (B) TABLE OF SECTIONS.—The table of sec-
18                tions for chapter 1 of subtitle I of title 49,
19                United States Code, is amended by amending the
20                item relating to section 110 to read as follows:
     ‘‘110. Great Lakes St. Lawrence Seaway Development Corporation.’’.

21   SEC. 513. DETERMINATION OF BUDGETARY EFFECTS.

22         The budgetary effects of this Act, for the purpose of
23 complying with the Statutory Pay-As-You-Go Act of 2010,
24 shall be determined by reference to the latest statement titled
25 ‘‘Budgetary Effects of PAYGO Legislation’’ for this Act,
       •S 1811 EAH
                           360
1 submitted for printing in the Congressional Record by the
2 Chairman of the House Budget Committee, provided that
3 such statement has been submitted prior to the vote on pas-
4 sage.

       Amend the title so as to read: ‘‘An Act to provide
  for improvements to the rivers and harbors of the United
  States, to provide for the conservation and development
  of water and related resources, and for other purposes.’’.
          Attest:




                                                    Clerk.




     •S 1811 EAH
116TH CONGRESS
   2D SESSION    S. 1811
       AMENDMENTS


File and source

File
BILLS_bills-116s1811eah_bills-116s1811eah.pdf
Size
669,745 bytes
SHA-256
3f9fa0f70a8653d94ed7db8ea9c16d23006609797f75fc6bab8fedb6374df7fa
Our copy
BILLS_bills-116s1811eah_bills-116s1811eah.pdf
Original
www.govinfo.gov
Back to top