Pandemic Darlings The pandemic economy, in original documents
Home Source documents H.R. 7575, Water Resources Development Act (July 24, 2020)

H.R. 7575, Water Resources Development Act (July 24, 2020)

Summary

H.R. 7575 is a bill to provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes. It was introduced in the House of Representatives on July 13, 2020 by Mr. DeFazio and referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on the Budget. On July 24, 2020 it was reported from the Committee on Transportation and Infrastructure with an amendment, the Committee on the Budget was discharged, and the bill was committed to the Committee of the Whole House on the State of the Union and ordered to be printed.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Bills Bills 116Hr7575Rh Bills 116Hr7575Rh
Case
Bills Bills 116Hr7575Rh Bills 116Hr7575Rh

Cite this document

“H.R. 7575, Water Resources Development Act (July 24, 2020).” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/bills-bills-116hr7575rh-bills-116hr7575rh/, SHA-256 938013e0c69cb1393f916eac5730ccaaff84208c7c9623a2909dc93cc42a1250.

Full text

                                                                                                                                                                          IB




                                                                                                                         Union Calendar No. 369
                                                                       116TH CONGRESS
                                                                          2D SESSION
                                                                                                             H. R. 7575
                                                                                                           [Report No. 116–460, Part I]

                                                                       To provide for improvements to the rivers and harbors of the United States,
                                                                           to provide for the conservation and development of water and related
                                                                           resources, and for other purposes.




                                                                                      IN THE HOUSE OF REPRESENTATIVES
                                                                                                        JULY 13, 2020
                                                                       Mr. DEFAZIO (for himself, Mr. GRAVES of Missouri, Mrs. NAPOLITANO, and
                                                                           Mr. WESTERMAN) introduced the following bill; which was referred to the
                                                                           Committee on Transportation and Infrastructure, and in addition to the
                                                                           Committee on the Budget, for a period to be subsequently determined by
                                                                           the Speaker, in each case for consideration of such provisions as fall with-
                                                                           in the jurisdiction of the committee concerned

                                                                                                     JULY 24, 2020
                                                                         Reported from the Committee on Transportation and Infrastructure with an
                                                                                                       amendment
                                                                                     [Strike out all after the enacting clause and insert the part printed in italic]

                                                                                                       JULY 24, 2020
                                                                            Committee on the Budget discharged; committed to the Committee of the
                                                                               Whole House on the State of the Union and ordered to be printed
                                                                                     [For text of introduced bill, see copy of bill as introduced on July 13, 2020]




kjohnson on DSK79L0C42PROD with BILLS



                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00001   Fmt 6652   Sfmt 6652   E:\BILLS\H7575.RH   H7575
                                                                                                                                  2

                                                                                                                  A BILL
                                                                       To provide for improvements to the rivers and harbors of
                                                                          the United States, to provide for the conservation and
                                                                          development of water and related resources, and for
                                                                          other purposes.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00002   Fmt 6652   Sfmt 6652   E:\BILLS\H7575.RH   H7575
                                                                                                                                   3
                                                                          1               Be it enacted by the Senate and House of Representa-
                                                                          2 tives of the United States of America in Congress assembled,
                                                                          3        SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

                                                                          4               (a) SHORT TITLE.—This Act may be cited as the
                                                                          5 ‘‘Water Resources Development Act of 2020’’.
                                                                          6               (b) TABLE OF CONTENTS.—The table of contents for
                                                                          7 this Act is as follows:
                                                                                   Sec. 1. Short title; table of contents.
                                                                                   Sec. 2. Secretary defined.

                                                                                                              TITLE I—GENERAL PROVISIONS

                                                                                   Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Mainte-
                                                                                                     nance Trust Fund.
                                                                                   Sec. 102. Funding for navigation.
                                                                                   Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund.
                                                                                   Sec. 104. Additional measures at donor ports and energy transfer ports.
                                                                                   Sec. 105. Assumption of maintenance of a locally preferred plan.
                                                                                   Sec. 106. Coast Guard anchorages.
                                                                                   Sec. 107. State contribution of funds for certain operation and maintenance costs.
                                                                                   Sec. 108. Inland waterway projects.
                                                                                   Sec. 109. Implementation of water resources principles and requirements.
                                                                                   Sec. 110. Resiliency planning assistance.
                                                                                   Sec. 111. Project consultation.
                                                                                   Sec. 112. Review of resiliency assessments.
                                                                                   Sec. 113. Small flood control projects.
                                                                                   Sec. 114. Conforming amendment.
                                                                                   Sec. 115. Feasibility studies; review of natural and nature-based features.
                                                                                   Sec. 116. Report on corrosion prevention activities.
                                                                                   Sec. 117. Quantification of benefits for flood risk management projects in seismic
                                                                                                     zones.
                                                                                   Sec. 118. Federal interest determination.
                                                                                   Sec. 119. Economically disadvantaged community flood protection and hurricane
                                                                                                     and storm damage reduction study pilot program.
                                                                                   Sec. 120. Permanent measures to reduce emergency flood fighting needs for com-
                                                                                                     munities subject to repetitive flooding.
                                                                                   Sec. 121. Emergency response to natural disasters.
                                                                                   Sec. 122. Study on natural infrastructure at Corps of Engineers projects.
                                                                                   Sec. 123. Review of Corps of Engineers assets.
                                                                                   Sec. 124. Sense of Congress on multipurpose projects.
                                                                                   Sec. 125. Beneficial reuse of dredged material; dredged material management
                                                                                                     plans.
                                                                                   Sec. 126. Aquatic ecosystem restoration for anadromous fish.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   Sec. 127. Annual report to Congress.
                                                                                   Sec. 128. Harmful algal bloom demonstration program.
                                                                                   Sec. 129. Update on Invasive Species Policy Guidance.
                                                                                   Sec. 130. Report on debris removal.


                                                                                      •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00003   Fmt 6652   Sfmt 6213   E:\BILLS\H7575.RH   H7575
                                                                                                                                   4
                                                                                   Sec. 131. Missouri River interception-rearing complex construction.
                                                                                   Sec. 132. Cost and benefit feasibility assessment.
                                                                                   Sec. 133. Materials, services, and funds for repair, restoration, or rehabilitation
                                                                                                    of projects.
                                                                                   Sec. 134. Levee safety.
                                                                                   Sec. 135. National Dam Safety Program.
                                                                                   Sec. 136. Rehabilitation of Corps of Engineers constructed pump stations.
                                                                                   Sec. 137. Non-Federal Project Implementation Pilot Program.
                                                                                   Sec. 138. Definition of economically disadvantaged community.
                                                                                   Sec. 139. Cost sharing provisions for territories and Indian Tribes.
                                                                                   Sec. 140. Flood control and other purposes.
                                                                                   Sec. 141. Review of contracting policies.
                                                                                   Sec. 142. Buy America.
                                                                                   Sec. 143. Annual report on status of feasibility studies.

                                                                                                            TITLE II—STUDIES AND REPORTS

                                                                                   Sec. 201. Authorization of proposed feasibility studies.
                                                                                   Sec. 202. Expedited completions.
                                                                                   Sec. 203. Feasibility study modifications.
                                                                                   Sec. 204. Selma, Alabama.
                                                                                   Sec. 205. Comprehensive study of the Sacramento River, Yolo Bypass, California.
                                                                                   Sec. 206. Lake Okeechobee regulation schedule, Florida.
                                                                                   Sec. 207. Great Lakes Coastal Resiliency Study.
                                                                                   Sec. 208. Rathbun Lake, Chariton River, Iowa.
                                                                                   Sec. 209. Report on the status of restoration in the Louisiana coastal area.
                                                                                   Sec. 210. Lower Mississippi River comprehensive study.
                                                                                   Sec. 211. Upper Mississippi River Comprehensive Plan.
                                                                                   Sec. 212. Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas,
                                                                                                    Nebraska, and Missouri.
                                                                                   Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Harbor, New
                                                                                                    Hampshire.
                                                                                   Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Oregon.
                                                                                   Sec. 215. Port Orford, Oregon.
                                                                                   Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas.
                                                                                   Sec. 217. GAO study on mitigation for water resources development projects.
                                                                                   Sec. 218. GAO study on application of Harbor Maintenance Trust Fund expendi-
                                                                                                    tures.
                                                                                   Sec. 219. GAO study on administration of environmental banks.
                                                                                   Sec. 220. Study on water supply and water conservation at water resources devel-
                                                                                                    opment projects.
                                                                                   Sec. 221. PFAS review and inventory at Corps facilities.
                                                                                   Sec. 222. Report on recreational facilities.

                                                                                             TITLE III—DEAUTHORIZATIONS AND MODIFICATIONS

                                                                                   Sec. 301. Deauthorization of inactive projects.
                                                                                   Sec. 302. Abandoned and inactive noncoal mine restoration.
                                                                                   Sec. 303. Tribal partnership program.
                                                                                   Sec. 304. Lakes program.
                                                                                   Sec. 305. Watercraft inspection stations.
                                                                                   Sec. 306. Chesapeake Bay Environmental Restoration and Protection Program.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   Sec. 307. Upper Mississippi River System Environmental Management Program.
                                                                                   Sec. 308. McClellan-Kerr Arkansas River Navigation System.
                                                                                   Sec. 309. Ouachita-Black River Navigation Project, Arkansas.
                                                                                   Sec. 310. Sacramento River, Glenn-Colusa, California.

                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00004   Fmt 6652   Sfmt 6213   E:\BILLS\H7575.RH   H7575
                                                                                                                                   5
                                                                                   Sec. 311. Lake Isabella, California.
                                                                                   Sec. 312. Lower San Joaquin River flood control project.
                                                                                   Sec. 313. San Diego River and Mission Bay, San Diego County, California.
                                                                                   Sec. 314. San Francisco, California, Waterfront Area.
                                                                                   Sec. 315. Western Pacific Interceptor Canal, Sacramento River, California.
                                                                                   Sec. 316. Rio Grande Environmental Management Program, Colorado, New Mex-
                                                                                                     ico, and Texas.
                                                                                   Sec. 317. New London Harbor Waterfront Channel, Connecticut.
                                                                                   Sec. 318. Washington Harbor, District of Columbia.
                                                                                   Sec. 319. Central Everglades, Florida.
                                                                                   Sec. 320. Miami River, Florida.
                                                                                   Sec. 321. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns
                                                                                                     River Basin, Florida.
                                                                                   Sec. 322. Calcasieu River and Pass, Louisiana.
                                                                                   Sec. 323. San Juan-Chama project; Abiquiu Dam, New Mexico.
                                                                                   Sec. 324. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode
                                                                                                     Island and Connecticut.
                                                                                   Sec. 325. Harris County, Texas.
                                                                                   Sec. 326. Cap Sante Waterway, Washington.
                                                                                   Sec. 327. Regional sediment management.
                                                                                   Sec. 328. Additional assistance for critical projects.
                                                                                   Sec. 329. Project modification authorizations.
                                                                                   Sec. 330. Application of credit.
                                                                                   Sec. 331. Project reauthorizations.
                                                                                   Sec. 332. Conveyances.
                                                                                   Sec. 333. Repeals.

                                                                                                 TITLE IV—WATER RESOURCES INFRASTRUCTURE

                                                                                   Sec. 401. Project authorizations.
                                                                                   Sec. 402. Special rules.
                                                                                   Sec. 403. Authorization of projects based on feasibility studies prepared by non-
                                                                                                     Federal interests.

                                                                          1        SEC. 2. SECRETARY DEFINED.

                                                                          2               In this Act, the term ‘‘Secretary’’ means the Secretary
                                                                          3 of the Army.
                                                                          4         TITLE I—GENERAL PROVISIONS
                                                                          5        SEC. 101. BUDGETARY TREATMENT EXPANSION AND AD-

                                                                          6                                 JUSTMENT FOR THE HARBOR MAINTENANCE

                                                                          7                                 TRUST FUND.

                                                                          8               (a) IN GENERAL.—Section 14003 of division B of the




kjohnson on DSK79L0C42PROD with BILLS
                                                                          9 CARES Act (Public Law 116–136) is amended to read as
                                                                       10 follows:

                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00005   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   6
                                                                          1               ‘‘SEC. 14003. Section 251(b)(2) of the Balanced Budget
                                                                          2 and Emergency Deficit Control Act of 1985 (2 U.S.C.
                                                                          3 901(b)(2)) is amended by adding at the end the following:
                                                                          4                                 ‘‘ ‘(H)         HARBOR               MAINTENANCE               ACTIVI-

                                                                          5                        TIES.—If, for any fiscal year, appropriations for

                                                                          6                        the Construction, Mississippi River and Tribu-
                                                                          7                        taries, and Operation and Maintenance accounts
                                                                          8                        of the Corps of Engineers are enacted that are
                                                                          9                        derived from the Harbor Maintenance Trust
                                                                       10                          Fund established under section 9505(a) of the In-
                                                                       11                          ternal Revenue Code of 1986 and that the Con-
                                                                       12                          gress designates in statute as being for harbor
                                                                       13                          operations and maintenance activities, then the
                                                                       14                          adjustment for that fiscal year shall be the total
                                                                       15                          of such appropriations that are derived from
                                                                       16                          such Fund and designated as being for harbor
                                                                       17                          operations and maintenance activities.’.’’.
                                                                       18                 (b) EFFECTIVE DATE.—The amendment made by sub-
                                                                       19 section (a) shall take effect as if included in the enactment
                                                                       20 of the CARES Act (Public Law 116–136).
                                                                       21          SEC. 102. FUNDING FOR NAVIGATION.

                                                                       22                 (a) FUNDING FOR NAVIGATION.—Section 210 of the
                                                                       23 Water Resources Development Act of 1986 (33 U.S.C. 2238)
                                                                       24 is amended, in the section heading, by striking ‘‘AUTHOR-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00006   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  7
                                                                          1        IZATION OF APPROPRIATIONS’’ and inserting ‘‘FUND-

                                                                          2        ING FOR NAVIGATION’’.

                                                                          3              (b) OPERATION                    AND         MAINTENANCE                  OF     HARBOR
                                                                          4 PROJECTS.—Section 210(c) of the Water Resources Devel-
                                                                          5 opment Act of 1986 (33 U.S.C. 2238(c)) is amended—
                                                                          6                       (1) by amending paragraph (1) to read as fol-
                                                                          7              lows:
                                                                          8                       ‘‘(1) IN GENERAL.—For each fiscal year, of the
                                                                          9              funds made available under this section (including
                                                                       10                funds appropriated from the Harbor Maintenance
                                                                       11                Trust Fund), the Secretary shall make expenditures to
                                                                       12                pay for operation and maintenance costs of the har-
                                                                       13                bors and inland harbors referred to in subsection
                                                                       14                (a)(2), using—
                                                                       15                                  ‘‘(A) not less than 20 percent of such funds
                                                                       16                         for emerging harbor projects, to the extent there
                                                                       17                         are identifiable operations and maintenance
                                                                       18                         needs, including eligible breakwater and jetty
                                                                       19                         needs, at such harbor projects;
                                                                       20                                  ‘‘(B) not less than 12 percent of such funds
                                                                       21                         for projects that are located within the Great
                                                                       22                         Lakes Navigation System;
                                                                       23                                  ‘‘(C) 10 percent of such funds for expanded
                                                                       24                         uses carried out at donor ports, as such term is



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         defined in section 2106 of the Water Resources


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00007   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  8
                                                                          1                       Reform and Development Act of 2014 (33 U.S.C.
                                                                          2                       2238c); and
                                                                          3                                ‘‘(D) any remaining funds for operation
                                                                          4                       and maintenance costs of any harbor or inland
                                                                          5                       harbor referred to in subsection (a)(2) based on
                                                                          6                       an equitable allocation of such funds among such
                                                                          7                       harbors and inland harbors.’’;
                                                                          8                       (2) by amending paragraph (3) to read as fol-
                                                                          9              lows:
                                                                       10                         ‘‘(3) ADDITIONAL                     USES         AT     EMERGING       HAR-

                                                                       11                BORS.—

                                                                       12                                  ‘‘(A) IN GENERAL.—In each fiscal year, the
                                                                       13                         Secretary may use not more than $5,000,000 of
                                                                       14                         funds designated for emerging harbor projects
                                                                       15                         under paragraph (1)(A) to pay for the costs of
                                                                       16                         up to 10 projects for maintenance dredging of a
                                                                       17                         marina or berthing area, in an emerging harbor,
                                                                       18                         that includes an area that is located adjacent to,
                                                                       19                         or is accessible by, a Federal navigation project,
                                                                       20                         subject to subparagraphs (B) and (C) of this
                                                                       21                         paragraph.
                                                                       22                                  ‘‘(B) ELIGIBLE EMERGING HARBORS.—The
                                                                       23                         Secretary may use funds as authorized under
                                                                       24                         subparagraph (A) at an emerging harbor that—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00008   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  9
                                                                          1                                        ‘‘(i) supports commercial activities, in-
                                                                          2                                cluding commercial fishing operations, com-
                                                                          3                                mercial fish processing operations, rec-
                                                                          4                                reational and sport fishing, and commercial
                                                                          5                                boat yards; or
                                                                          6                                        ‘‘(ii) supports activities of the Sec-
                                                                          7                                retary of the department in which the Coast
                                                                          8                                Guard is operating.
                                                                          9                                ‘‘(C) COST-SHARING REQUIREMENTS.—The
                                                                       10                         Secretary shall require a non-Federal interest to
                                                                       11                         contribute not less than 25 percent of the costs
                                                                       12                         for maintenance dredging of that portion of a
                                                                       13                         maintenance dredging project described in sub-
                                                                       14                         paragraph (A) that is located outside of the Fed-
                                                                       15                         eral navigation project, which may be provided
                                                                       16                         as an in-kind contribution, including through
                                                                       17                         the use of dredge equipment owned by non-Fed-
                                                                       18                         eral interest to carry out such activities.’’; and
                                                                       19                         (3) by adding at the end the following:
                                                                       20                         ‘‘(5) EMERGENCY EXPENDITURES.—Nothing in
                                                                       21                this subsection prohibits the Secretary from making
                                                                       22                an expenditure to pay for the operation and mainte-
                                                                       23                nance costs of a specific harbor or inland harbor, in-
                                                                       24                cluding the transfer of funding from the operation



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                and maintenance of a separate project, if—


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00009   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   10
                                                                          1                                 ‘‘(A) the Secretary determines that the ac-
                                                                          2                        tion is necessary to address the navigation needs
                                                                          3                        of a harbor or inland harbor where safe naviga-
                                                                          4                        tion has been severely restricted due to an un-
                                                                          5                        foreseen event; and
                                                                          6                                 ‘‘(B) the Secretary provides within 90 days
                                                                          7                        of the action notice and information on the need
                                                                          8                        for the action to the Committee on Environment
                                                                          9                        and Public Works and the Committee on Appro-
                                                                       10                          priations of the Senate and the Committee on
                                                                       11                          Transportation and Infrastructure and the Com-
                                                                       12                          mittee on Appropriations of the House of Rep-
                                                                       13                          resentatives.’’.
                                                                       14                 (c) PRIORITIZATION.—Section 210 of the Water Re-
                                                                       15 sources Development Act of 1986 (33 U.S.C. 2238) is
                                                                       16 amended by striking subsection (d) and redesignating sub-
                                                                       17 sections (e) and (f) as subsections (d) and (e), respectively.
                                                                       18                 (d) ASSESSMENT OF HARBORS AND INLAND HAR-
                                                                       19          BORS.—Section 210(d)(2)(A)(ii) of the Water Resources De-

                                                                       20 velopment Act of 1986 (as so redesignated) is amended by
                                                                       21 striking ‘‘expanded uses at eligible harbors or inland har-
                                                                       22 bors referred to in subsection (d)(2)’’ and inserting ‘‘uses
                                                                       23 described in paragraphs (1)(C) and (3) of subsection (c)’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00010   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  11
                                                                          1              (e) DEFINITIONS.—Section 210(e) of the Water Re-
                                                                          2 sources Development Act of 1986 (as so redesignated) is
                                                                          3 amended—
                                                                          4                       (1) by striking paragraphs (6) through (9);
                                                                          5                       (2) by redesignating paragraphs (3) through (5)
                                                                          6              as paragraphs (4) through (6), respectively;
                                                                          7                       (3) by striking paragraph (2) and inserting the
                                                                          8              following:
                                                                          9                       ‘‘(2) EMERGING HARBOR.—The term ‘emerging
                                                                       10                harbor’ means a harbor or inland harbor referred to
                                                                       11                in subsection (a)(2) that transits less than 1,000,000
                                                                       12                tons of cargo annually.
                                                                       13                         ‘‘(3) EMERGING HARBOR PROJECT.—The term
                                                                       14                ‘emerging harbor project’ means a project that is as-
                                                                       15                signed to an emerging harbor.’’; and
                                                                       16                         (4) in paragraph (4) (as so redesignated), by
                                                                       17                adding at the end the following:
                                                                       18                                  ‘‘(C) An in-water improvement, if the im-
                                                                       19                         provement—
                                                                       20                                          ‘‘(i) is for the seismic reinforcement of
                                                                       21                                  a wharf or other berthing structure, or the
                                                                       22                                  repair or replacement of a deteriorating
                                                                       23                                  wharf or other berthing structure, at a port
                                                                       24                                  facility;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00011   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  12
                                                                          1                                        ‘‘(ii) benefits commercial navigation at
                                                                          2                                 the harbor; and
                                                                          3                                        ‘‘(iii) is located in, or adjacent to, a
                                                                          4                                 berth that is accessible to a Federal naviga-
                                                                          5                                 tion project.
                                                                          6                                 ‘‘(D) An activity to maintain slope stability
                                                                          7                       at a berth in a harbor that is accessible to a Fed-
                                                                          8                       eral navigation project if such activity benefits
                                                                          9                       commercial navigation at the harbor.’’.
                                                                       10          SEC. 103. ANNUAL REPORT TO CONGRESS ON THE HARBOR

                                                                       11                                  MAINTENANCE TRUST FUND.

                                                                       12                Section 330 of the Water Resources Development Act
                                                                       13 of 1992 (26 U.S.C. 9505 note; 106 Stat. 4851) is amended—
                                                                       14                         (1) in subsection (a)—
                                                                       15                                   (A) by striking ‘‘and annually thereafter,’’
                                                                       16                         and inserting ‘‘and annually thereafter concur-
                                                                       17                         rent with the submission of the President’s an-
                                                                       18                         nual budget request to Congress,’’; and
                                                                       19                                   (B) by striking ‘‘Public Works and Trans-
                                                                       20                         portation’’ and inserting ‘‘Transportation and
                                                                       21                         Infrastructure’’; and
                                                                       22                         (2) in subsection (b)(1) by adding at the end the
                                                                       23                following:
                                                                       24                                   ‘‘(D) A description of the expected expendi-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         tures from the trust fund to meet the needs of


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00012   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  13
                                                                          1                       navigation for the fiscal year of the budget re-
                                                                          2                       quest.’’.
                                                                          3        SEC. 104. ADDITIONAL MEASURES AT DONOR PORTS AND

                                                                          4                                ENERGY TRANSFER PORTS.

                                                                          5              (a) DEFINITIONS.—Section 2106(a) of the Water Re-
                                                                          6 sources Reform and Development Act of 2014 (33 U.S.C.
                                                                          7 2238c(a)) is amended—
                                                                          8                       (1) in paragraph (3)(A)—
                                                                          9                                 (A) by amending clause (ii) to read as fol-
                                                                       10                         lows:
                                                                       11                                          ‘‘(ii) at which the total amount of har-
                                                                       12                                   bor maintenance taxes collected (including
                                                                       13                                   the estimated taxes related to domestic cargo
                                                                       14                                   and cruise passengers) comprise not less
                                                                       15                                   than $15,000,000 annually of the total
                                                                       16                                   funding of the Harbor Maintenance Trust
                                                                       17                                   Fund in each of the previous 3 fiscal
                                                                       18                                   years;’’;
                                                                       19                                   (B) in clause (iii), by inserting ‘‘(including
                                                                       20                         the estimated taxes related to domestic cargo and
                                                                       21                         cruise passengers)’’ after ‘‘taxes collected’’; and
                                                                       22                                   (C) in clause (iv), by striking ‘‘fiscal year
                                                                       23                         2012’’ and inserting ‘‘each of the previous 3 fis-
                                                                       24                         cal years’’;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00013   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  14
                                                                          1                       (2) in paragraph (5)(B), by striking ‘‘fiscal year
                                                                          2              2012’’ each place it appears and inserting ‘‘each of
                                                                          3              the previous 3 fiscal years’’;
                                                                          4                       (3) by redesignating paragraph (8) as para-
                                                                          5              graph (9) and inserting after paragraph (7) the fol-
                                                                          6              lowing:
                                                                          7                       ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—The
                                                                          8              term ‘Harbor Maintenance Trust Fund’ means the
                                                                          9              Harbor Maintenance Trust Fund established by sec-
                                                                       10                tion 9505 of the Internal Revenue Code of 1986.’’; and
                                                                       11                         (4) in paragraph (9), as so redesignated—
                                                                       12                                  (A) by amending subparagraph (B) to read
                                                                       13                         as follows:
                                                                       14                                  ‘‘(B) at which the total amount of harbor
                                                                       15                         maintenance taxes collected (including the esti-
                                                                       16                         mated taxes related to domestic cargo and cruise
                                                                       17                         passengers)              comprise             annually            more   than
                                                                       18                         $5,000,000 but less than $15,000,000 of the total
                                                                       19                         funding of the Harbor Maintenance Trust Fund
                                                                       20                         in each of the previous 3 fiscal years;’’;
                                                                       21                                  (B) in subparagraph (C), by inserting ‘‘(in-
                                                                       22                         cluding the estimated taxes related to domestic
                                                                       23                         cargo and cruise passengers)’’ after ‘‘taxes col-
                                                                       24                         lected’’; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00014   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   15
                                                                          1                                  (C) in subparagraph (D), by striking ‘‘fis-
                                                                          2                        cal year 2012’’ and inserting ‘‘each of the pre-
                                                                          3                        vious 3 fiscal years’’.
                                                                          4               (b) REPORT TO CONGRESS; AUTHORIZATION OF AP-
                                                                          5        PROPRIATIONS.—Section 2106 of the Water Resources Re-

                                                                          6 form and Development Act of 2014 (33 U.S.C. 2238c) is
                                                                          7 amended—
                                                                          8                        (1) by striking subsection (e) and redesignating
                                                                          9               subsections (f) and (g) as subsections (e) and (f), re-
                                                                       10                 spectively; and
                                                                       11                          (2) in subsection (e), as so redesignated—
                                                                       12                                    (A) in paragraph (1), by striking ‘‘2020’’
                                                                       13                          and inserting ‘‘2030’’; and
                                                                       14                                    (B) by striking paragraph (3).
                                                                       15          SEC. 105. ASSUMPTION OF MAINTENANCE OF A LOCALLY

                                                                       16                                   PREFERRED PLAN.

                                                                       17                 Section 204(f) of the Water Resources Development Act
                                                                       18 of 1986 (33 U.S.C. 2232(f)) is amended to read as follows:
                                                                       19                 ‘‘(f) OPERATION AND MAINTENANCE.—
                                                                       20                          ‘‘(1) ASSUMPTION OF MAINTENANCE.—Whenever
                                                                       21                 a non-Federal interest carries out improvements to a
                                                                       22                 federally authorized harbor or inland harbor, the Sec-
                                                                       23                 retary shall be responsible for operation and mainte-
                                                                       24                 nance in accordance with section 101(b) if—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00015   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  16
                                                                          1                                ‘‘(A) before construction of the improve-
                                                                          2                       ments—
                                                                          3                                        ‘‘(i) the Secretary determines that the
                                                                          4                                improvements are feasible and consistent
                                                                          5                                with the purposes of this title; and
                                                                          6                                        ‘‘(ii) the Secretary and the non-Federal
                                                                          7                                interest execute a written agreement relat-
                                                                          8                                ing to operation and maintenance of the
                                                                          9                                improvements;
                                                                       10                                  ‘‘(B) the Secretary certifies that the project
                                                                       11                         or separable element of the project is constructed
                                                                       12                         in accordance with applicable permits and ap-
                                                                       13                         propriate engineering and design standards; and
                                                                       14                                  ‘‘(C) the Secretary does not find that the
                                                                       15                         project or separable element is no longer feasible.
                                                                       16                         ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN THE
                                                                       17                COSTS OF A LOCALLY PREFERRED PLAN.—In the case

                                                                       18                of improvements determined by the Secretary pursu-
                                                                       19                ant to paragraph (1)(A)(i) to deviate from the na-
                                                                       20                tional economic development plan, the Secretary shall
                                                                       21                be responsible for all operation and maintenance costs
                                                                       22                of such improvements, as described in section 101(b),
                                                                       23                including costs in excess of the costs of the national
                                                                       24                economic development plan, if the Secretary deter-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00016   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   17
                                                                          1               mines that the improvements satisfy the requirements
                                                                          2               of paragraph (1).’’.
                                                                          3        SEC. 106. COAST GUARD ANCHORAGES.

                                                                          4               The Secretary is authorized to perform dredging at
                                                                          5 Federal expense within and adjacent to anchorages on the
                                                                          6 Columbia River established by the Coast Guard pursuant
                                                                          7 to section 7 of the Act of March 14, 1915 (33 U.S.C. 471),
                                                                          8 to provide safe anchorage for deep draft vessels commensu-
                                                                          9 rate with the authorized Federal navigation channel depth,
                                                                       10 including advanced maintenance.
                                                                       11          SEC. 107. STATE CONTRIBUTION OF FUNDS FOR CERTAIN

                                                                       12                                   OPERATION AND MAINTENANCE COSTS.

                                                                       13                 In carrying out eligible operations and maintenance
                                                                       14 activities within the Great Lakes Navigation System pursu-
                                                                       15 ant to section 210 of the Water Resources Development Act
                                                                       16 of 1986 (33 U.S.C. 2238) in a State that has implemented
                                                                       17 any additional State limitation on the disposal of dredged
                                                                       18 material in the open waters of such State, the Secretary
                                                                       19 may, pursuant to section 5 of the Act of June 22, 1936
                                                                       20 (33 U.S.C. 701h), receive from such State, and expend, such
                                                                       21 funds as may be contributed by the State to cover the addi-
                                                                       22 tional costs for operations and maintenance activities for
                                                                       23 a harbor or inland harbor within such State that result
                                                                       24 from such limitation.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00017   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   18
                                                                          1        SEC. 108. INLAND WATERWAY PROJECTS.

                                                                          2               (a) IN GENERAL.—Notwithstanding section 102 of the
                                                                          3 Water Resources Development Act of 1986 (33 U.S.C. 2212),
                                                                          4 35 percent of the costs of construction of any project for
                                                                          5 navigation on the inland waterways shall be paid from
                                                                          6 amounts appropriated from the Inland Waterways Trust
                                                                          7 Fund—
                                                                          8                        (1) during each of fiscal years 2021 through
                                                                          9               2027; and
                                                                       10                          (2) for a project the construction of which is ini-
                                                                       11                 tiated during such period, in each fiscal year until
                                                                       12                 such construction is complete.
                                                                       13                 (b) PRIORITIZATION.—In selecting projects described
                                                                       14 in subsection (a) for which to initiate construction during
                                                                       15 any of fiscal years 2021 through 2027, the Secretary shall
                                                                       16 prioritize projects that are included in the most recent 20-
                                                                       17 year program for making capital investments developed
                                                                       18 under section 302(d) of the Water Resources Development
                                                                       19 Act of 1986 (33 U.S.C. 2251(d)).
                                                                       20          SEC. 109. IMPLEMENTATION OF WATER RESOURCES PRIN-

                                                                       21                                   CIPLES AND REQUIREMENTS.

                                                                       22                 (a) IN GENERAL.—Not later than 180 days after the
                                                                       23 date of enactment of this Act, the Secretary shall issue final
                                                                       24 agency-specific procedures necessary to implement the prin-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 ciples and requirements and the interagency guidelines.


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00018   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  19
                                                                          1              (b) DEVELOPMENT OF FUTURE WATER RESOURCES
                                                                          2 DEVELOPMENT PROJECTS.—The procedures required by
                                                                          3 subsection (a) shall ensure that the Secretary, in the formu-
                                                                          4 lation of future water resources development projects—
                                                                          5                       (1) develops such projects in accordance with—
                                                                          6                                (A) the guiding principles established by the
                                                                          7                       principles and requirements; and
                                                                          8                                (B) the national water resources planning
                                                                          9                       policy established by section 2031(a) of the
                                                                       10                         Water Resources Development Act of 2007 (42
                                                                       11                         U.S.C. 1962–3(a)); and
                                                                       12                         (2) fully identifies and analyzes national eco-
                                                                       13                nomic development benefits, regional economic devel-
                                                                       14                opment benefits, environmental quality benefits, and
                                                                       15                other societal effects.
                                                                       16                (c) REVIEW AND UPDATE.—Every 5 years, the Sec-
                                                                       17 retary shall review and, where appropriate, revise the pro-
                                                                       18 cedures required by subsection (a).
                                                                       19                (d) PUBLIC REVIEW, NOTICE, AND COMMENT.—In
                                                                       20 issuing, reviewing, and revising the procedures required by
                                                                       21 this section, the Secretary shall—
                                                                       22                         (1) provide notice to interested non-Federal
                                                                       23                stakeholders of the Secretary’s intent to revise the pro-
                                                                       24                cedures;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00019   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                    20
                                                                          1                        (2) provide opportunities for interested non-Fed-
                                                                          2               eral stakeholders to engage with, and provide input
                                                                          3               and recommendations to, the Secretary on the revi-
                                                                          4               sion of the procedures; and
                                                                          5                        (3) solicit and consider public and expert com-
                                                                          6               ments.
                                                                          7               (e) DEFINITIONS.—In this section:
                                                                          8                        (1)        INTERAGENCY                       GUIDELINES.—The              term
                                                                          9               ‘‘interagency                 guidelines’’            means         the      interagency
                                                                       10                 guidelines contained in the document finalized by the
                                                                       11                 Council on Environmental Quality pursuant to sec-
                                                                       12                 tion 2031 of the Water Resources Development Act of
                                                                       13                 2007 (42 U.S.C. 1962–3) in December 2014, to imple-
                                                                       14                 ment the principles and requirements.
                                                                       15                          (2) PRINCIPLES AND REQUIREMENTS.—The term
                                                                       16                 ‘‘principles and requirements’’ means the principles
                                                                       17                 and requirements contained in the document prepared
                                                                       18                 by the Council on Environmental Quality pursuant
                                                                       19                 to section 2031 of the Water Resources Development
                                                                       20                 Act of 2007 (42 U.S.C. 1962–3), entitled ‘‘Principles
                                                                       21                 and Requirements for Federal Investments in Water
                                                                       22                 Resources’’, and dated March 2013.
                                                                       23          SEC. 110. RESILIENCY PLANNING ASSISTANCE.

                                                                       24                 (a) IN GENERAL.—Section 206(a) of the Flood Control



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 Act of 1960 (33 U.S.C. 709a(a)) is amended by inserting


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00020    Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   21
                                                                          1 ‘‘, to avoid repetitive flooding impacts, to anticipate, pre-
                                                                          2 pare, and adapt to changing climatic conditions and ex-
                                                                          3 treme weather events, and to withstand, respond to, and re-
                                                                          4 cover rapidly from disruption due to the flood hazards’’
                                                                          5 after ‘‘in planning to ameliorate the flood hazard’’.
                                                                          6               (b) PRIORITIZING FLOOD RISK RESILIENCY TECH-
                                                                          7        NICAL         ASSISTANCE FOR ECONOMICALLY DISADVANTAGED
                                                                          8 COMMUNITIES.—In carrying out section 206 of the Flood
                                                                          9 Control Act of 1960 (33 U.S.C. 709a), the Secretary shall
                                                                       10 prioritize the provision of technical assistance to support
                                                                       11 flood risk resiliency planning efforts of an economically dis-
                                                                       12 advantaged community.
                                                                       13          SEC. 111. PROJECT CONSULTATION.

                                                                       14                 (a) REPORTS REQUIRED.—Not later than 180 days
                                                                       15 after the date of enactment of this Act, the Secretary shall
                                                                       16 submit the following reports:
                                                                       17                          (1) The report required under section 1214 of the
                                                                       18                 Water Resources Development Act of 2018 (132 Stat.
                                                                       19                 3809).
                                                                       20                          (2) The report required under section 1120(a)(3)
                                                                       21                 of the Water Resources Development Act of 2016 (130
                                                                       22                 Stat. 1643).
                                                                       23                 (b) CONSULTATION.—
                                                                       24                          (1) AGENCIES AND TRIBES.—The Secretary shall



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 ensure that all covered community consultation poli-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00021   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  22
                                                                          1              cies, regulations, and guidance of the Corps of Engi-
                                                                          2              neers continue to be implemented, and that consulta-
                                                                          3              tions with Federal and State agencies and Indian
                                                                          4              Tribes required for a water resources development
                                                                          5              project are carried out.
                                                                          6                       (2) COMMUNITIES.—The Secretary shall ensure
                                                                          7              that any covered communities, including such com-
                                                                          8              munities identified in the reports submitted under
                                                                          9              subsection (a), that are found to be disproportionately
                                                                       10                or adversely affected are included in consultation
                                                                       11                policies, regulations, and guidance of the Corps of
                                                                       12                Engineers.
                                                                       13                         (3) PROJECT PLANNING AND CONSTRUCTION.—
                                                                       14                The Secretary shall ensure that covered communities
                                                                       15                are consulted in the development of water resources
                                                                       16                development project planning and construction, for
                                                                       17                the purposes of achieving environmental justice and
                                                                       18                addressing any disproportionate or adverse effects on
                                                                       19                such communities.
                                                                       20                (c) ENVIRONMENTAL JUSTICE UPDATES.—
                                                                       21                         (1) IN GENERAL.—Not later than 1 year after
                                                                       22                the date of enactment of this Act, the Secretary shall
                                                                       23                update any policies, regulations, and guidance of the
                                                                       24                Corps of Engineers related to achieving environ-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                mental justice for covered communities.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00022   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  23
                                                                          1                       (2) RECOMMENDATIONS AND CONSULTATION.—In
                                                                          2              carrying out paragraph (1), the Secretary shall—
                                                                          3                                (A) consult with a wide array of representa-
                                                                          4                       tives of covered communities; and
                                                                          5                                (B) use the recommendations from the re-
                                                                          6                       ports submitted under subsection (a).
                                                                          7              (d) COMMUNITY ENGAGEMENT.—The Secretary shall
                                                                          8 ensure that in carrying out authorized water resources de-
                                                                          9 velopment projects in, and all other activities of the Corps
                                                                       10 of Engineers related to, covered communities, the Corps of
                                                                       11 Engineers—
                                                                       12                         (1) promotes the meaningful involvement of such
                                                                       13                communities in the project development and imple-
                                                                       14                mentation, enforcement efforts, and other activities of
                                                                       15                the Corps of Engineers;
                                                                       16                         (2) provides guidance and technical assistance to
                                                                       17                such communities to increase understanding of the
                                                                       18                project development and implementation activities,
                                                                       19                regulations, and policies of the Corps of Engineers;
                                                                       20                and
                                                                       21                         (3) cooperates with State, Tribal, and local gov-
                                                                       22                ernments with respect to activities carried out pursu-
                                                                       23                ant to this subsection.
                                                                       24                (e) TRIBAL LANDS AND CONSULTATION.—The Sec-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 retary shall ensure that in carrying out authorized water


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00023   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  24
                                                                          1 resources development projects and in all other activities of
                                                                          2 the Corps of Engineers, that the Corps of Engineers—
                                                                          3                       (1)(A) consults with Indian Tribes specifically
                                                                          4              on any Tribal lands near or adjacent to any activi-
                                                                          5              ties of the Corps of Engineers, for purposes of identi-
                                                                          6              fying lands of ancestral, cultural, or religious impor-
                                                                          7              tance; and
                                                                          8                       (B) cooperates with Indian Tribes to avoid, or
                                                                          9              otherwise find alternate solutions with respect to, such
                                                                       10                lands; and
                                                                       11                         (2)(A) consults with Indian Tribes specifically
                                                                       12                on any Tribal areas near or adjacent to any activi-
                                                                       13                ties of the Corps of Engineers, for purposes of identi-
                                                                       14                fying lands, waters, and other resources critical to the
                                                                       15                livelihood of the Indian Tribes; and
                                                                       16                         (B) cooperates with Indian Tribes to avoid, or
                                                                       17                otherwise find alternate solutions with respect to, such
                                                                       18                areas.
                                                                       19                (f) DEFINITIONS.—In this section:
                                                                       20                         (1) COMMUNITY OF COLOR.—The term ‘‘commu-
                                                                       21                nity of color’’ means a community of individuals who
                                                                       22                are—
                                                                       23                                  (A) American Indian or Alaska Native;
                                                                       24                                  (B) Asian or Pacific Islander;



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  (C) Black, not of Hispanic origin; or


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00024   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   25
                                                                          1                                 (D) Hispanic.
                                                                          2                        (2) COVERED COMMUNITY.—The term ‘‘covered
                                                                          3               community’’ means each of the following:
                                                                          4                                 (A) A community of color.
                                                                          5                                 (B) An economically disadvantaged commu-
                                                                          6                        nity.
                                                                          7                                 (C) A rural community.
                                                                          8                                 (D) A Tribal or indigenous community.
                                                                          9                        (3) STATE.—The term ‘‘State’’ means each of the
                                                                       10                 several States, the District of Columbia, and each of
                                                                       11                 the commonwealths, territories, and possessions of the
                                                                       12                 United States.
                                                                       13          SEC. 112. REVIEW OF RESILIENCY ASSESSMENTS.

                                                                       14                 (a) RESILIENCY ASSESSMENT.—
                                                                       15                          (1) IN GENERAL.—Not later than 180 days after
                                                                       16                 the date of enactment of this section, and in conjunc-
                                                                       17                 tion with the development of procedures under section
                                                                       18                 109 of this Act, the Secretary is directed to review,
                                                                       19                 and where appropriate, revise the existing planning
                                                                       20                 guidance documents and regulations on the assess-
                                                                       21                 ment of the effects of sea level rise on future water re-
                                                                       22                 sources development projects to ensure that such guid-
                                                                       23                 ance documents and regulations are based on the best
                                                                       24                 available, peer-reviewed science and data on the cur-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00025   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  26
                                                                          1              rent and future effects of sea level rise on coastal com-
                                                                          2              munities.
                                                                          3                       (2) COORDINATION.—In carrying out this sub-
                                                                          4              section, the Secretary shall—
                                                                          5                                (A) coordinate the review with the Engineer
                                                                          6                       Research and Development Center, other Federal
                                                                          7                       and State agencies, and other relevant entities;
                                                                          8                       and
                                                                          9                                (B) to the maximum extent practicable and
                                                                       10                         where appropriate, utilize data provided to the
                                                                       11                         Secretary by such agencies.
                                                                       12                (b) ASSESSMENT OF BENEFITS OF SEA LEVEL RISE
                                                                       13 RESILIENCY IN FEASIBILITY REPORTS.—
                                                                       14                         (1) IN GENERAL.—Upon the request of a non-
                                                                       15                Federal interest, in carrying out a feasibility study
                                                                       16                for a project for flood risk mitigation, hurricane and
                                                                       17                storm damage risk reduction, or ecosystem restoration
                                                                       18                under section 905 of the Water Resources Development
                                                                       19                Act of 1986 (33 U.S.C. 2282), the Secretary shall con-
                                                                       20                sider whether the need for the project is predicated
                                                                       21                upon or exacerbated by conditions related to sea level
                                                                       22                rise.
                                                                       23                         (2) SEA LEVEL RISE RESILIENCY BENEFITS.—To
                                                                       24                the maximum extent practicable, in carrying out a



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                study pursuant to paragraph (1), the Secretary shall


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00026   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   27
                                                                          1               document the potential effects of sea level rise on the
                                                                          2               project, and benefits of the project relating to sea level
                                                                          3               rise, during the 50-year period after the date of com-
                                                                          4               pletion of the project.
                                                                          5        SEC. 113. SMALL FLOOD CONTROL PROJECTS.

                                                                          6               Section 205 of the Flood Control Act of 1948 (33
                                                                          7 U.S.C. 701s) is amended by inserting ‘‘, and projects that
                                                                          8 use natural features or nature-based features (as those terms
                                                                          9 are defined in section 1184(a) of the Water Resources Devel-
                                                                       10 opment Act of 2016 (33 U.S.C. 2289a(a))),’’ after ‘‘non-
                                                                       11 structural projects’’.
                                                                       12          SEC. 114. CONFORMING AMENDMENT.

                                                                       13                 Section 103(b) of the Water Resources Development Act
                                                                       14 of 1986 (33 U.S.C. 2213) is amended—
                                                                       15                          (1) in the subsection heading, by striking ‘‘NON-
                                                                       16                 STRUCTURAL               FLOOD CONTROL PROJECTS’’ and in-
                                                                       17                 serting ‘‘PROJECTS USING NONSTRUCTURAL, NAT-
                                                                       18                 URAL, OR NATURE-BASED FEATURES’’; and

                                                                       19                          (2) in paragraph (1)—
                                                                       20                                   (A) by striking ‘‘nonstructural flood control
                                                                       21                          measures’’ and inserting ‘‘a flood risk manage-
                                                                       22                          ment or hurricane and storm damage risk reduc-
                                                                       23                          tion measure using a nonstructural feature, or a
                                                                       24                          natural feature or nature-based feature (as those



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          terms are defined in section 1184(a) of the Water


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00027   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   28
                                                                          1                        Resources Development Act of 2016 (33 U.S.C.
                                                                          2                        2289a(a))),’’; and
                                                                          3                                  (B) by striking ‘‘cash during construction of
                                                                          4                        the project’’ and inserting ‘‘cash during construc-
                                                                          5                        tion for a nonstructural feature if the costs of
                                                                          6                        land, easements, rights-of-way, dredged material
                                                                          7                        disposal areas, and relocations for such feature
                                                                          8                        are estimated to exceed 35 percent’’.
                                                                          9        SEC. 115. FEASIBILITY STUDIES; REVIEW OF NATURAL AND

                                                                       10                                   NATURE-BASED FEATURES.

                                                                       11                 (a) TECHNICAL CORRECTION.—Section 1149(c) of the
                                                                       12 Water Resources Development Act of 2018 (33 U.S.C. 2282
                                                                       13 note; 132 Stat. 3787) is amended by striking ‘‘natural in-
                                                                       14 frastructure alternatives’’ and inserting ‘‘natural feature or
                                                                       15 nature-based feature alternatives (as such terms are defined
                                                                       16 in section 1184 of the Water Resources Development Act of
                                                                       17 2016 (32 U.S.C. 2289a))’’.
                                                                       18                 (b) SUMMARY OF ANALYSIS.—To the maximum extent
                                                                       19 practicable, the Secretary shall include in each feasibility
                                                                       20 report developed under section 905 of the Water Resources
                                                                       21 Development Act of 1986 (33 U.S.C. 2282) for a project that
                                                                       22 contains a flood risk management or hurricane and storm
                                                                       23 damage risk reduction element, a summary of the natural
                                                                       24 feature or nature-based feature alternatives that were evalu-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 ated in the development of the feasibility report, and, if such


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00028   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   29
                                                                          1 alternatives were not included in the recommended plan,
                                                                          2 an explanation of why such alternatives were not included
                                                                          3 into the recommended plan.
                                                                          4        SEC. 116. REPORT ON CORROSION PREVENTION ACTIVI-

                                                                          5                                TIES.

                                                                          6              Not later than 180 days after the date of enactment
                                                                          7 of this Act, the Secretary shall submit to the Committee on
                                                                          8 Transportation and Infrastructure of the House of Rep-
                                                                          9 resentatives and the Committee on Environment and Public
                                                                       10 Works of the Senate, and make publicly available, a report
                                                                       11 that describes—
                                                                       12                         (1) the extent to which the Secretary has carried
                                                                       13                out section 1033 of the Water Resources Reform and
                                                                       14                Development Act of 2014 (33 U.S.C. 2350);
                                                                       15                         (2) the extent to which the Secretary has incor-
                                                                       16                porated corrosion prevention activities (as defined in
                                                                       17                such section) at water resources development projects
                                                                       18                constructed or maintained by the Secretary since the
                                                                       19                date of enactment of such section; and
                                                                       20                         (3) in instances where the Secretary has not in-
                                                                       21                corporated corrosion prevention activities at such
                                                                       22                water resources development projects since such date,
                                                                       23                an explanation as to why such corrosion prevention
                                                                       24                activities have not been incorporated.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000    Frm 00029   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   30
                                                                          1        SEC. 117. QUANTIFICATION OF BENEFITS FOR FLOOD RISK

                                                                          2                                 MANAGEMENT PROJECTS IN SEISMIC ZONES.

                                                                          3               (a) IN GENERAL.—Upon the request of the non-Federal
                                                                          4 interest for a flood risk management project in a seismic
                                                                          5 zone, the Secretary shall quantify the seismic hazard risk
                                                                          6 reduction benefits for the project if the non-Federal interest
                                                                          7 identifies, and the Secretary approves, an acceptable meth-
                                                                          8 odology to quantify such benefits.
                                                                          9               (b) APPLICABILITY.—The Secretary shall—
                                                                       10                          (1) include all associated seismic hazard risk re-
                                                                       11                 duction benefits approved by the Secretary in the cal-
                                                                       12                 culation of the national economic development benefit-
                                                                       13                 cost ratio for a flood risk management project in a
                                                                       14                 seismic hazard zone for purposes of plan formulation
                                                                       15                 pursuant to section 905 of the Water Resources Devel-
                                                                       16                 opment Act of 1986; and
                                                                       17                          (2) seek to maximize the combination of flood
                                                                       18                 risk reduction and seismic hazard risk reduction ben-
                                                                       19                 efits in the formulation of the national economic de-
                                                                       20                 velopment alternative for such project.
                                                                       21          SEC. 118. FEDERAL INTEREST DETERMINATION.

                                                                       22                 Section 905 of the Water Resources Development Act
                                                                       23 of 1986 (33 U.S.C. 2282) is amended by inserting after sub-
                                                                       24 section (a) the following:




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 ‘‘(b) FEDERAL INTEREST DETERMINATION.—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00030   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  31
                                                                          1                       ‘‘(1) IN GENERAL.—In preparing a feasibility
                                                                          2              report under subsection (a) for a study that will ben-
                                                                          3              efit an economically disadvantaged community, upon
                                                                          4              request by the non-Federal interest for the study, the
                                                                          5              Secretary shall first determine the Federal interest in
                                                                          6              carrying out the study and the projects that may be
                                                                          7              proposed in the study.
                                                                          8                       ‘‘(2) COST SHARE.—The costs of a determination
                                                                          9              under paragraph (1)—
                                                                       10                                  ‘‘(A) shall be at Federal expense; and
                                                                       11                                  ‘‘(B) shall not exceed $200,000.
                                                                       12                         ‘‘(3) DEADLINE.—A determination under para-
                                                                       13                graph (1) shall be completed by not later than 120
                                                                       14                days after the date on which funds are made available
                                                                       15                to the Secretary to carry out the determination.
                                                                       16                         ‘‘(4) TREATMENT.—
                                                                       17                                  ‘‘(A) TIMING.—The period during which a
                                                                       18                         determination is being completed under para-
                                                                       19                         graph (1) for a study shall not be included for
                                                                       20                         purposes of the deadline to complete a final fea-
                                                                       21                         sibility report under section 1001(a)(1) of the
                                                                       22                         Water Resources Reform and Development Act of
                                                                       23                         2014 (33 U.S.C. 2282c(a)(1)).
                                                                       24                                  ‘‘(B) COST.—The cost of a determination



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         under paragraph (1) shall not be included for


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00031   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  32
                                                                          1                       purposes of the maximum Federal cost under sec-
                                                                          2                       tion 1001(a)(2) of the Water Resources Reform
                                                                          3                       and Development Act of 2014 (33 U.S.C.
                                                                          4                       2282c(a)(2)).
                                                                          5                       ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If,
                                                                          6              based on a determination under paragraph (1), the
                                                                          7              Secretary determines that a study or project is not in
                                                                          8              the Federal interest because the project will not result,
                                                                          9              or is unlikely to result, in a recommended plan that
                                                                       10                will produce national economic development benefits
                                                                       11                greater than cost, but may result in a technically
                                                                       12                sound and environmentally acceptable plan that is
                                                                       13                otherwise consistent with section 904 of the Water Re-
                                                                       14                sources Development Act of 1986 (33 U.S.C. 2281),
                                                                       15                the Secretary shall issue a report to the non-Federal
                                                                       16                interest with recommendations on how the non-Fed-
                                                                       17                eral interest might modify the proposal such that the
                                                                       18                project could be in the Federal interest and feasible.’’.
                                                                       19          SEC. 119. ECONOMICALLY DISADVANTAGED COMMUNITY

                                                                       20                                  FLOOD PROTECTION AND HURRICANE AND

                                                                       21                                  STORM DAMAGE REDUCTION STUDY PILOT

                                                                       22                                  PROGRAM.

                                                                       23                (a) IN GENERAL.—Not later than 180 days after the
                                                                       24 date of enactment of this Act, the Secretary shall establish



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 and implement a pilot program to evaluate opportunities


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00032   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  33
                                                                          1 to address the flood risk management and hurricane and
                                                                          2 storm damage risk reduction needs of economically dis-
                                                                          3 advantaged communities.
                                                                          4              (b) PARTICIPATION IN PILOT PROGRAM.—In carrying
                                                                          5 out subsection (a), the Secretary shall—
                                                                          6                       (1) publish a notice in the Federal Register that
                                                                          7              requests from non-Federal interests proposals for the
                                                                          8              potential feasibility study of a flood risk management
                                                                          9              project or hurricane and storm damage risk reduction
                                                                       10                project for an economically disadvantaged commu-
                                                                       11                nity;
                                                                       12                         (2) upon request of a non-Federal interest for
                                                                       13                such a project, provide technical assistance to such
                                                                       14                non-Federal interest in the formulation of a proposal
                                                                       15                for a potential feasibility study to be submitted to the
                                                                       16                Secretary under the pilot program; and
                                                                       17                         (3) review such proposals and select 10 feasi-
                                                                       18                bility studies for such projects to be carried out by the
                                                                       19                Secretary, in coordination with the non-Federal in-
                                                                       20                terest, under this pilot program.
                                                                       21                (c) SELECTION CRITERIA.—In selecting a feasibility
                                                                       22 study under subsection (b)(3), the Secretary shall consider
                                                                       23 whether—
                                                                       24                         (1) the percentage of people living in poverty in



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                the county or counties (or county-equivalent entity or


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00033   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  34
                                                                          1              entities) in which the project is located is above the
                                                                          2              percentage of people living in poverty in the State,
                                                                          3              based on census bureau data;
                                                                          4                       (2) the percentage of families with income above
                                                                          5              the poverty threshold but below the average household
                                                                          6              income in the county or counties (or county-equiva-
                                                                          7              lent entity or entities) in which the project is located
                                                                          8              is above the percentage of the same for the State,
                                                                          9              based on census bureau data;
                                                                       10                         (3) the percentage of the population that identi-
                                                                       11                fies as belonging to a minority or indigenous group
                                                                       12                in the county or counties (or county-equivalent entity
                                                                       13                or entities) in which the project is located is above the
                                                                       14                average percentage in the State, based on census bu-
                                                                       15                reau data; and
                                                                       16                         (4) the project is addressing flooding or hurri-
                                                                       17                cane or storm damage effects that have a dispropor-
                                                                       18                tionate impact on a rural community or a commu-
                                                                       19                nity of color (as such term is defined in section 111
                                                                       20                of this Act), including Tribal or indigenous peoples.
                                                                       21                (d) ADMINISTRATION.—Notwithstanding the require-
                                                                       22 ments of section 105(a)(1)(A) of the Water Resources Devel-
                                                                       23 opment Act of 1986 (33 U.S.C. 2215), the Federal share
                                                                       24 of the cost of a feasibility study carried out under the pilot



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 program shall be 100 percent.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00034   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  35
                                                                          1              (e) GEOGRAPHIC DIVERSITY.—When selecting feasi-
                                                                          2 bility studies under subsection (b)(3), the Secretary shall
                                                                          3 consider the geographic diversity among proposed projects.
                                                                          4              (f) STUDY REQUIREMENTS.—Feasibility studies car-
                                                                          5 ried out under this subsection shall, to the maximum extent
                                                                          6 practical, incorporate natural features or nature-based fea-
                                                                          7 tures (as such terms are defined in section 1184 of the Water
                                                                          8 Resources Development Act of 2016 (33 U.S.C. 2289a)), or
                                                                          9 a combination of such features and nonstructural features,
                                                                       10 that avoid or reduce at least 50 percent of flood or storm
                                                                       11 damages in one or more of the alternatives included in the
                                                                       12 final alternatives evaluated.
                                                                       13                (g) NOTIFICATION.—The Secretary shall notify the
                                                                       14 Committee on Transportation and Infrastructure of the
                                                                       15 House of Representatives and the Committee on Environ-
                                                                       16 ment and Public Works of the Senate of the selection of each
                                                                       17 feasibility study under the pilot program.
                                                                       18                (h) COMPLETION.—Upon completion of a feasibility
                                                                       19 report for a feasibility study selected to be carried out under
                                                                       20 this section, the Secretary shall transmit the report to Con-
                                                                       21 gress for authorization, and shall include the report in the
                                                                       22 next annual report submitted under section 7001 of the
                                                                       23 Water Resources Reform and Development Act of 2014 (33
                                                                       24 U.S.C. 2282d).



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00035   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  36
                                                                          1              (i) SUNSET.—The authority to commence a feasibility
                                                                          2 study under this section shall terminate on the date that
                                                                          3 is 10 years after the date of enactment of this Act.
                                                                          4              (j) REPORT.—Not later than 5 years and 10 years
                                                                          5 after the date of enactment of this Act, the Secretary shall
                                                                          6 submit to the Committee on Transportation and Infrastruc-
                                                                          7 ture of the House of Representatives and the Committee on
                                                                          8 Environment and Public Works of the Senate, and make
                                                                          9 publicly available, a report detailing the results of the pilot
                                                                       10 program carried out under this section, including—
                                                                       11                         (1) a description of proposals received from non-
                                                                       12                Federal interests pursuant to subsection (b)(1);
                                                                       13                         (2) a description of technical assistance provided
                                                                       14                to non-Federal interests under subsection (b)(2); and
                                                                       15                         (3) a description of proposals selected under sub-
                                                                       16                section (b)(3) and criteria used to select such pro-
                                                                       17                posals.
                                                                       18                (k) STATE DEFINED.—In this section, the term
                                                                       19 ‘‘State’’ means each of the several States, the District of Co-
                                                                       20 lumbia, and each of the commonwealths, territories, and
                                                                       21 possessions of the United States.
                                                                       22          SEC. 120. PERMANENT MEASURES TO REDUCE EMERGENCY

                                                                       23                                  FLOOD FIGHTING NEEDS FOR COMMUNITIES

                                                                       24



kjohnson on DSK79L0C42PROD with BILLS
                                                                                                           SUBJECT TO REPETITIVE FLOODING.

                                                                       25                (a) DEFINITIONS.—In this section:


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00036   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  37
                                                                          1                       (1) AFFECTED COMMUNITY.—The term ‘‘affected
                                                                          2              community’’ means a legally constituted public body
                                                                          3              (as that term is used in section 221(b) of the Flood
                                                                          4              Control Act of 1970 (42 U.S.C. 1962d–5b(b))—
                                                                          5                                (A) with jurisdiction over an area that has
                                                                          6                       been subject to flooding in two or more events in
                                                                          7                       any 10-year period; and
                                                                          8                                (B) that has received emergency flood-fight-
                                                                          9                       ing assistance, including construction of tem-
                                                                       10                         porary barriers by the Secretary, under section
                                                                       11                         5 of the Act of August 18, 1941 (33 U.S.C. 701n)
                                                                       12                         with respect to such flood events.
                                                                       13                         (2) NATURAL                 FEATURE;              NATURE-BASED          FEA-

                                                                       14                TURE.—The               terms ‘‘natural feature’’ and ‘‘nature-
                                                                       15                based feature’’ have the meanings given those terms in
                                                                       16                section 1184 of the Water Resources Development Act
                                                                       17                of 2016 (33 U.S.C. 2289a).
                                                                       18                (b) PROGRAM.—
                                                                       19                         (1) IN GENERAL.—The Secretary is authorized to
                                                                       20                carry out a program to study, design, and construct
                                                                       21                water resources development projects through meas-
                                                                       22                ures involving, among other things, strengthening,
                                                                       23                raising, extending, realigning, or otherwise modifying
                                                                       24                existing flood control works, designing new works,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                and incorporating natural features, nature-based fea-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00037   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  38
                                                                          1              tures, or nonstructural features, as appropriate to
                                                                          2              provide flood and coastal storm risk management to
                                                                          3              affected communities.
                                                                          4                       (2) CONSIDERATIONS.—In carrying out para-
                                                                          5              graph (1), the Secretary shall, to the maximum extent
                                                                          6              practical, review and, where appropriate, incorporate
                                                                          7              natural features or nature-based features, or a com-
                                                                          8              bination of such features and nonstructural features,
                                                                          9              that avoid or reduce at least 50 percent of flood or
                                                                       10                storm damages in one or more of the alternatives in-
                                                                       11                cluded in the final alternatives evaluated.
                                                                       12                         (3) CONSTRUCTION.—
                                                                       13                                  (A) IN            GENERAL.—The                    Secretary may
                                                                       14                         carry out a project described in paragraph (1)
                                                                       15                         without further congressional authorization if—
                                                                       16                                          (i) the Secretary determines that the
                                                                       17                                  project—
                                                                       18                                                   (I) is advisable to reduce the risk
                                                                       19                                          of flooding for an affected community;
                                                                       20                                          and
                                                                       21                                                   (II) produces benefits that are in
                                                                       22                                          excess of the estimated costs; and
                                                                       23                                          (ii) the Federal share of the cost of the
                                                                       24                                  construction does not exceed $15,000,000.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00038   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  39
                                                                          1                                (B) SPECIFIC AUTHORIZATION.—If the Fed-
                                                                          2                       eral share of the cost of a project described in
                                                                          3                       paragraph (1) exceeds $15,000,000, the Secretary
                                                                          4                       shall submit the project recommendation to Con-
                                                                          5                       gress for authorization prior to construction, and
                                                                          6                       shall include the project recommendation in the
                                                                          7                       next annual report submitted under section 7001
                                                                          8                       of the Water Resources Reform and Development
                                                                          9                       Act of 2014.
                                                                       10                                  (C) FINANCING.—
                                                                       11                                          (i) CONTRIBUTIONS.—If, based on a
                                                                       12                                  study carried out pursuant to paragraph
                                                                       13                                  (1), the Secretary determines that a project
                                                                       14                                  described in paragraph (1) will not produce
                                                                       15                                  benefits greater than cost, the Secretary
                                                                       16                                  shall allow the affected community to pay,
                                                                       17                                  or provide contributions equal to, an
                                                                       18                                  amount sufficient to make the remaining
                                                                       19                                  costs of design and construction of the
                                                                       20                                  project equal to the estimated value of the
                                                                       21                                  benefits of the project.
                                                                       22                                          (ii)           EFFECT              ON          NON-FEDERAL

                                                                       23                                  SHARE.—Amounts provided by an affected

                                                                       24                                  community under clause (i) shall be in ad-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  dition to any payments or contributions the


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00039   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   40
                                                                          1                                 affected community is required to provide
                                                                          2                                 toward the remaining costs of design and
                                                                          3                                 construction of the project under section 103
                                                                          4                                 of the Water Resources Development Act of
                                                                          5                                 1986 (33 U.S.C. 2213).
                                                                          6                        (4) ABILITY TO PAY.—
                                                                          7                                 (A) IN GENERAL.—Any cost-sharing agree-
                                                                          8                        ment for a project entered into pursuant to this
                                                                          9                        section shall be subject to the ability of the af-
                                                                       10                          fected community to pay.
                                                                       11                                   (B) DETERMINATION.—The ability of any
                                                                       12                          affected community to pay shall be determined
                                                                       13                          by the Secretary in accordance with procedures
                                                                       14                          established by the Secretary.
                                                                       15                                   (C) EFFECT OF REDUCTION.—Any reduc-
                                                                       16                          tion in the non-Federal share of the cost of a
                                                                       17                          project described in paragraph (1) as a result of
                                                                       18                          a determination under this paragraph shall not
                                                                       19                          be included in the Federal share for purposes of
                                                                       20                          subparagraphs (A) and (B) of paragraph (3).
                                                                       21          SEC. 121. EMERGENCY RESPONSE TO NATURAL DISASTERS.

                                                                       22                 (a) IN GENERAL.—Section 5 of the Act of August 18,
                                                                       23 1941 (33 U.S.C. 701n) is amended—
                                                                       24                          (1) in subsection (a), by adding at the end the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 following—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00040   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  41
                                                                          1                       ‘‘(5) FEASIBILITY STUDY.—
                                                                          2                                ‘‘(A) DETERMINATION.—Not later than 180
                                                                          3                       days after receiving, from a non-Federal sponsor
                                                                          4                       of a project to repair or rehabilitate a flood con-
                                                                          5                       trol work described in paragraph (1), a request
                                                                          6                       to initiate a feasibility study to further modify
                                                                          7                       the relevant flood control work to provide for an
                                                                          8                       increased level of protection, the Secretary shall
                                                                          9                       provide to the non-Federal sponsor a written de-
                                                                       10                         cision on whether the Secretary has the authority
                                                                       11                         under section 216 of the Flood Control Act of
                                                                       12                         1970 (33 U.S.C. 549a) to undertake the requested
                                                                       13                         feasibility study.
                                                                       14                                  ‘‘(B) RECOMMENDATION.—If the Secretary
                                                                       15                         determines under subparagraph (B) that the Sec-
                                                                       16                         retary does not have the authority to undertake
                                                                       17                         the requested feasibility study, the Secretary
                                                                       18                         shall include the request for a feasibility study in
                                                                       19                         the annual report submitted under section 7001
                                                                       20                         of the Water Resources Reform and Development
                                                                       21                         Act of 2014.’’;
                                                                       22                         (2) in subsection (c)—
                                                                       23                                  (A) in the subsection heading, by striking
                                                                       24                         ‘‘LEVEE OWNERS MANUAL’’ and inserting ‘‘ELI-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         GIBILITY’’;



                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00041   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  42
                                                                          1                                (B) in paragraph (1), in the heading, by
                                                                          2                       striking ‘‘IN GENERAL’’ and inserting ‘‘LEVEE
                                                                          3                       OWNER’S MANUAL’’;

                                                                          4                                (C) by redesignating paragraphs (2) and
                                                                          5                       (3) as paragraphs (3) and (4), respectively, and
                                                                          6                       inserting after paragraph (1) the following:
                                                                          7                       ‘‘(2) COMPLIANCE.—
                                                                          8                                ‘‘(A) IN           GENERAL.—Notwithstanding                    the
                                                                          9                       status of compliance of a non-Federal interest
                                                                       10                         with the requirements of a levee owner’s manual
                                                                       11                         described in paragraph (1), or with any other
                                                                       12                         eligibility requirement established by the Sec-
                                                                       13                         retary related to the maintenance and upkeep re-
                                                                       14                         sponsibilities of the non-Federal interest, the Sec-
                                                                       15                         retary shall consider the non-Federal interest to
                                                                       16                         be eligible for repair and rehabilitation assist-
                                                                       17                         ance under this section if the non-Federal inter-
                                                                       18                         est—
                                                                       19                                          ‘‘(i) enters into a written agreement
                                                                       20                                  with the Secretary that identifies any items
                                                                       21                                  of deferred or inadequate maintenance and
                                                                       22                                  upkeep identified by the Secretary prior to
                                                                       23                                  the natural disaster; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00042   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   43
                                                                          1                                         ‘‘(ii) pays, during performance of the
                                                                          2                                  repair and rehabilitation work, all costs to
                                                                          3                                  address—
                                                                          4                                                  ‘‘(I) any items of deferred or in-
                                                                          5                                         adequate             maintenance                and    upkeep
                                                                          6                                         identified by the Secretary; and
                                                                          7                                                  ‘‘(II) any repair or rehabilitation
                                                                          8                                         work necessary to address damage the
                                                                          9                                         Secretary attributes to such deferred or
                                                                       10                                           inadequate maintenance or upkeep.
                                                                       11                                    ‘‘(B) ELIGIBILITY.—The Secretary may
                                                                       12                          only enter into one agreement under subpara-
                                                                       13                          graph (A) with any non-Federal interest.
                                                                       14                                    ‘‘(C) SUNSET.—The authority of the Sec-
                                                                       15                          retary to enter into agreements under paragraph
                                                                       16                          (2) shall terminate on the date that is 5 years
                                                                       17                          after the date of enactment of this paragraph.’’;
                                                                       18                          and
                                                                       19                                    (D) in paragraph (3) (as so redesignated),
                                                                       20                          by striking ‘‘this subsection’’ and inserting
                                                                       21                          ‘‘paragraph (1)’’.
                                                                       22          SEC. 122. STUDY ON NATURAL INFRASTRUCTURE AT CORPS

                                                                       23                                   OF ENGINEERS PROJECTS.

                                                                       24                 (a) DEFINITION OF NATURAL FEATURE AND NATURE-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25          BASED FEATURE.—In this section, the terms ‘‘natural fea-



                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00043   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  44
                                                                          1 ture’’ and ‘‘nature-based feature’’ have the meanings given
                                                                          2 those terms in section 1184(a) of the Water Resources Devel-
                                                                          3 opment Act of 2016 (33 U.S.C. 2289a(a)).
                                                                          4              (b) STUDY.—Not later than 2 years after the date of
                                                                          5 enactment of this Act, the Comptroller General of the United
                                                                          6 States shall conduct, and submit to the Committee on
                                                                          7 Transportation and Infrastructure of the House of Rep-
                                                                          8 resentatives and the Committee on Environment and Public
                                                                          9 Works of the Senate, a report on the results of a study on
                                                                       10 the consideration by the Secretary of natural infrastructure,
                                                                       11 natural features, and nature-based features in the study of
                                                                       12 the feasibility of projects for flood risk management, hurri-
                                                                       13 cane and storm damage risk reduction, and ecosystem res-
                                                                       14 toration.
                                                                       15                (c) REQUIREMENTS.—The study under subsection (b)
                                                                       16 shall include—
                                                                       17                         (1) a description of guidance or instructions
                                                                       18                issued, and other measures taken, by the Secretary to
                                                                       19                consider natural infrastructure, natural features, and
                                                                       20                nature-based features in project feasibility studies;
                                                                       21                         (2) an assessment, based on information from
                                                                       22                relevant Federal and non-Federal sources, of—
                                                                       23                                  (A) the costs, benefits, and effects associated
                                                                       24                         with natural infrastructure, natural features,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         and nature-based features recommended by the


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00044   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  45
                                                                          1                       Secretary for flood risk management, hurricane
                                                                          2                       and storm damage risk reduction, and ecosystem
                                                                          3                       restoration; and
                                                                          4                                (B) the effectiveness of natural infrastruc-
                                                                          5                       ture, natural features, and nature-based features;
                                                                          6                       (3) an analysis of projects for flood risk manage-
                                                                          7              ment, hurricane and storm damage risk reduction,
                                                                          8              and ecosystem restoration that have incorporated nat-
                                                                          9              ural infrastructure, natural features, or nature-based
                                                                       10                features to identify best practices, including for meas-
                                                                       11                uring project benefits and costs;
                                                                       12                         (4) a description of any statutory, fiscal, regu-
                                                                       13                latory, or other policy barriers to the appropriate
                                                                       14                consideration and use of a full array of natural in-
                                                                       15                frastructure, natural features, and nature-based fea-
                                                                       16                tures in carrying out feasibility studies and projects;
                                                                       17                and
                                                                       18                         (5) any recommendations for changes to law, or
                                                                       19                to fiscal, regulatory, or other policies, to improve the
                                                                       20                use of natural infrastructure, natural features, and
                                                                       21                nature-based features by the Corps of Engineers in
                                                                       22                carrying out feasibility studies and projects.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00045   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   46
                                                                          1        SEC. 123. REVIEW OF CORPS OF ENGINEERS ASSETS.

                                                                          2               Section 6002 of the Water Resources Reform and De-
                                                                          3 velopment Act of 2014 (128 Stat. 1349) is amended to read
                                                                          4 as follows:
                                                                          5        ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS ASSETS.

                                                                          6               ‘‘(a) ASSESSMENT.—The Secretary shall conduct an
                                                                          7 assessment of projects constructed by the Secretary for
                                                                          8 which the Secretary continues to have financial or oper-
                                                                          9 ational responsibility.
                                                                       10                 ‘‘(b) INVENTORY.—Not later than 18 months after the
                                                                       11 date of enactment of the Water Resources Development Act
                                                                       12 of 2020, the Secretary shall, based on the assessment carried
                                                                       13 out under subsection (a), develop an inventory of projects
                                                                       14 or portions of projects—
                                                                       15                          ‘‘(1) that are not needed for the missions of the
                                                                       16                 Corps of Engineers;
                                                                       17                          ‘‘(2) the modification of which, including though
                                                                       18                 the use of natural features or nature-based features
                                                                       19                 (as those terms are defined in section 1184(a) of the
                                                                       20                 Water Resources Development Act of 2016 (33 U.S.C.
                                                                       21                 2289a(a)), could improve the sustainable operations
                                                                       22                 of the project, or reduce operation and maintenance
                                                                       23                 costs for the project; or
                                                                       24                          ‘‘(3) that are no longer having project purposes




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 adequately met by the Corps of Engineers, because of
                                                                       26                 deferment of maintenance or other challenges, and the
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00046   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  47
                                                                          1              divestment of which to a non-Federal entity could bet-
                                                                          2              ter meet the local and regional needs for operation
                                                                          3              and maintenance.
                                                                          4              ‘‘(c) CRITERIA.—In conducting the assessment under
                                                                          5 subsection (a) and developing the inventory under sub-
                                                                          6 section (b), the Secretary shall use the following criteria:
                                                                          7                       ‘‘(1) The extent to which the project aligns with
                                                                          8              the current missions of the Corps of Engineers.
                                                                          9                       ‘‘(2) The economic and environmental impacts of
                                                                       10                the project on existing communities in the vicinity of
                                                                       11                the project.
                                                                       12                         ‘‘(3) The extent to which the divestment or modi-
                                                                       13                fication of the project could reduce operation and
                                                                       14                maintenance costs of the Corps of Engineers.
                                                                       15                         ‘‘(4) The extent to which the divestment or modi-
                                                                       16                fication of the project is in the public interest.
                                                                       17                         ‘‘(5) The extent to which investment of addi-
                                                                       18                tional Federal resources in the project proposed for
                                                                       19                divestment or modification, including investment
                                                                       20                needed to bring the project to a good state of repair,
                                                                       21                is in the public interest.
                                                                       22                         ‘‘(6) The extent to which the authorized purpose
                                                                       23                of the project is no longer being met.
                                                                       24                ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL INTER-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25          ESTS.—A          non-Federal interest for a project may rec-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00047   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   48
                                                                          1 ommend that the Secretary include such project in the as-
                                                                          2 sessment or inventory required under this section.
                                                                          3               ‘‘(e) REPORT TO CONGRESS.—
                                                                          4                        ‘‘(1) IN GENERAL.—Upon completion of the in-
                                                                          5               ventory required by subsection (b), the Secretary shall
                                                                          6               submit to the Committee on Environment and Public
                                                                          7               Works of the Senate and the Committee on Transpor-
                                                                          8               tation and Infrastructure of the House of Representa-
                                                                          9               tives, and make publicly available, a report con-
                                                                       10                 taining the findings of the Secretary with respect to
                                                                       11                 the assessment and inventory required under this sec-
                                                                       12                 tion.
                                                                       13                          ‘‘(2) INCLUSION.—The Secretary shall list in an
                                                                       14                 appendix any recommendation of a non-Federal in-
                                                                       15                 terest made with respect to a project under subsection
                                                                       16                 (d) that the Secretary determines not to include in the
                                                                       17                 inventory developed under subsection (b), based on the
                                                                       18                 criteria in subsection (c), including information
                                                                       19                 about the request and the reasons for the Secretary’s
                                                                       20                 determination.’’.
                                                                       21          SEC.      124.      SENSE            OF    CONGRESS                ON       MULTIPURPOSE

                                                                       22                                   PROJECTS.

                                                                       23                 It is the sense of Congress that the Secretary, in coordi-
                                                                       24 nation with non-Federal interests, should maximize the de-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 velopment, evaluation, and recommendation of project al-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00048   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  49
                                                                          1 ternatives for future water resources development projects
                                                                          2 that produce multiple project benefits, such as navigation,
                                                                          3 flood risk management, and ecosystem restoration benefits,
                                                                          4 including through the use of natural or nature-based fea-
                                                                          5 tures and the beneficial reuse of dredged material.
                                                                          6        SEC. 125. BENEFICIAL REUSE OF DREDGED MATERIAL;

                                                                          7                                DREDGED MATERIAL MANAGEMENT PLANS.

                                                                          8              (a) NATIONAL POLICY ON THE BENEFICIAL REUSE OF
                                                                          9 DREDGED MATERIAL.—
                                                                       10                         (1) IN GENERAL.—It is the policy of the United
                                                                       11                States for the Corps of Engineers to maximize the
                                                                       12                beneficial reuse, in an environmentally acceptable
                                                                       13                manner, of suitable dredged material obtained from
                                                                       14                the construction or operation and maintenance of
                                                                       15                water resources development projects.
                                                                       16                         (2) PLACEMENT OF DREDGED MATERIALS.—
                                                                       17                                   (A) IN GENERAL.—In evaluating the place-
                                                                       18                         ment of dredged material obtained from the con-
                                                                       19                         struction or operation and maintenance of water
                                                                       20                         resources development projects, the Secretary
                                                                       21                         shall consider—
                                                                       22                                          (i) the suitability of the dredged mate-
                                                                       23                                   rial for a full range of beneficial uses; and
                                                                       24                                          (ii) the economic and environmental



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                   benefits, efficiencies, and impacts (including


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00049   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  50
                                                                          1                                the effects on living coral) of using the
                                                                          2                                dredged material for beneficial uses, includ-
                                                                          3                                ing, in the case of beneficial reuse activities
                                                                          4                                that involve more than one water resources
                                                                          5                                development                 project,        the        benefits,   effi-
                                                                          6                                ciencies, and impacts that result from the
                                                                          7                                combined activities.
                                                                          8                                (B) CALCULATION                        OF     FEDERAL          STAND-

                                                                          9                       ARD.—The               economic benefits and efficiencies
                                                                       10                         from the beneficial use of dredged material con-
                                                                       11                         sidered by the Secretary under subparagraph (A)
                                                                       12                         shall be included in any determination relating
                                                                       13                         to the ‘‘Federal standard’’ by the Secretary
                                                                       14                         under section 335.7 of title 33, Code of Federal
                                                                       15                         Regulations for the placement or disposal of such
                                                                       16                         material.
                                                                       17                (b) BENEFICIAL USE OF DREDGED MATERIAL.—
                                                                       18                         (1) PILOT PROGRAM PROJECTS.—Section 1122 of
                                                                       19                the Water Resources Development Act of 2016 (33
                                                                       20                U.S.C. 2326 note) is amended—
                                                                       21                                  (A) in subsection (b)(1), by striking ‘‘20’’
                                                                       22                         and inserting ‘‘30’’; and
                                                                       23                                  (B) in subsection (g), by striking ‘‘20’’ and
                                                                       24                         inserting ‘‘30’’.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00050   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  51
                                                                          1                       (2) SENSE OF CONGRESS.—It is the sense of
                                                                          2              Congress that the Secretary, in selecting projects for
                                                                          3              the beneficial reuse of dredged materials under section
                                                                          4              1122 of the Water Resources Development Act of 2016
                                                                          5              (33 U.S.C. 2326 note), should ensure the thorough
                                                                          6              evaluation of project submissions from rural, small,
                                                                          7              and economically disadvantaged communities.
                                                                          8              (c) FIVE-YEAR REGIONAL DREDGED MATERIAL MAN-
                                                                          9        AGEMENT PLANS.—

                                                                       10                         (1) IN GENERAL.—Not later than 1 year after
                                                                       11                the date of enactment of this Act, and annually there-
                                                                       12                after, the District Commander of each district of the
                                                                       13                Corps of Engineers that obtains dredged material
                                                                       14                through the construction or operation and mainte-
                                                                       15                nance of a water resources development project shall,
                                                                       16                at Federal expense, develop and submit to the Sec-
                                                                       17                retary a 5-year dredged material management plan
                                                                       18                in coordination with relevant State agencies and
                                                                       19                stakeholders.
                                                                       20                         (2) SCOPE.—Each plan developed under this
                                                                       21                subsection shall include—
                                                                       22                                  (A) a dredged material budget for each wa-
                                                                       23                         tershed or littoral system within the district;
                                                                       24                                  (B) an estimate of the amount of dredged



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         material likely to be obtained through the con-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00051   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  52
                                                                          1                       struction or operation and maintenance of all
                                                                          2                       water resources development projects projected to
                                                                          3                       be carried out within the district during the 5-
                                                                          4                       year period following submission of the plan,
                                                                          5                       and the estimated timing for obtaining such
                                                                          6                       dredged material;
                                                                          7                                (C) an identification of potential water re-
                                                                          8                       sources development projects projected to be car-
                                                                          9                       ried out within the district during such 5-year
                                                                       10                         period that are suitable for, or that require, the
                                                                       11                         placement of dredged material, and an estimate
                                                                       12                         of the amount of dredged material placement ca-
                                                                       13                         pacity of such projects;
                                                                       14                                  (D) an evaluation of—
                                                                       15                                          (i) the suitability of the dredged mate-
                                                                       16                                  rial for a full range of beneficial uses; and
                                                                       17                                          (ii) the economic and environmental
                                                                       18                                  benefits, efficiencies, and impacts (including
                                                                       19                                  the effects on living coral) of using the
                                                                       20                                  dredged material for beneficial uses, includ-
                                                                       21                                  ing, in the case of beneficial reuse activities
                                                                       22                                  that involve more than one water resources
                                                                       23                                  development                 project,        the        benefits,   effi-
                                                                       24                                  ciencies, and impacts that result from the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  combined activities; and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00052   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  53
                                                                          1                                (E) the district-wide goals for beneficial
                                                                          2                       reuse of the dredged material, including any ex-
                                                                          3                       pected cost savings from aligning and coordi-
                                                                          4                       nating multiple projects (including projects
                                                                          5                       across Corps districts) in the reuse of the dredged
                                                                          6                       material.
                                                                          7                       (3) PUBLIC COMMENT.—In developing each plan
                                                                          8              under this subsection, each District Commander shall
                                                                          9              provide notice and an opportunity for public com-
                                                                       10                ment.
                                                                       11                         (4) PUBLIC AVAILABILITY.—Upon submission of
                                                                       12                each plan to the Secretary under this subsection, each
                                                                       13                District Commander shall make the plan publicly
                                                                       14                available, including on a publicly available website.
                                                                       15                (d) DREDGE PILOT PROGRAM.—
                                                                       16                         (1) REVISIONS.—Section 1111 of the Water Re-
                                                                       17                sources Development Act of 2018 (33 U.S.C. 2326
                                                                       18                note) is amended—
                                                                       19                                  (A) in subsection (a), by striking ‘‘for the
                                                                       20                         operation and maintenance of harbors and in-
                                                                       21                         land harbors’’ and all that follows through the
                                                                       22                         period at the end and inserting the following:
                                                                       23                         ‘‘for the—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00053   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  54
                                                                          1                       ‘‘(1) harbors and inland harbors referred to in
                                                                          2              section 210(a)(2) of the Water Resources Development
                                                                          3              Act of 1986 (33 U.S.C. 2238(a)(2)); or
                                                                          4                       ‘‘(2) inland and intracoastal waterways of the
                                                                          5              United States described in section 206 of the Inland
                                                                          6              Waterways Revenue Act of 1978 (33 U.S.C. 1804).’’;
                                                                          7              and
                                                                          8                                 (B) in subsection (b), by striking ‘‘or inland
                                                                          9                       harbors’’ and inserting ‘‘, inland harbors, or in-
                                                                       10                         land or intracoastal waterways’’.
                                                                       11                         (2) COORDINATION                       WITH EXISTING AUTHORI-

                                                                       12                TIES.—The Secretary may carry out the dredge pilot

                                                                       13                program authorized by section 1111 of the Water Re-
                                                                       14                sources Development Act of 2018 (33 U.S.C. 2326
                                                                       15                note) in coordination with Federal regional dredge
                                                                       16                demonstration programs in effect on the date of enact-
                                                                       17                ment of this Act.
                                                                       18          SEC. 126. AQUATIC ECOSYSTEM RESTORATION FOR ANAD-

                                                                       19                                  ROMOUS FISH.

                                                                       20                (a) ANADROMOUS FISH HABITAT AND PASSAGE.—Sec-
                                                                       21 tion 206 of the Water Resources Development Act of 1996
                                                                       22 (33 U.S.C. 2330) is amended—
                                                                       23                         (1) in subsection (a), by adding at the end the
                                                                       24                following:



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00054   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   55
                                                                          1                        ‘‘(3) ANADROMOUS                       FISH        HABITAT              AND   PAS-

                                                                          2               SAGE.—

                                                                          3                                 ‘‘(A) MEASURES.—A project under this sec-
                                                                          4                        tion may include measures to improve habitat or
                                                                          5                        passage for anadromous fish, including—
                                                                          6                                         ‘‘(i) installing fish bypass structures on
                                                                          7                                 small water diversions;
                                                                          8                                         ‘‘(ii) modifying tide gates; and
                                                                          9                                         ‘‘(iii)          restoring             or        reconnecting
                                                                       10                                   floodplains and wetlands that are impor-
                                                                       11                                   tant for anadromous fish habitat or pas-
                                                                       12                                   sage.
                                                                       13                                   ‘‘(B) BENEFITS.—A project that includes
                                                                       14                          measures under this paragraph shall be formu-
                                                                       15                          lated to maximize benefits for the anadromous
                                                                       16                          fish species benefitted by the project.’’; and
                                                                       17                          (2) by adding at the end the following:
                                                                       18                 ‘‘(g) PRIORITIZATION.—The Secretary shall give
                                                                       19 projects that include measures described in subsection (a)(3)
                                                                       20 equal priority for implementation as other projects under
                                                                       21 this section.’’.
                                                                       22          SEC. 127. ANNUAL REPORT TO CONGRESS.

                                                                       23                 Section 7001(c)(4)(B) of the Water Resources Reform
                                                                       24 and Development Act of 2014 (33 U.S.C. 2282d(c)(4)(B))



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 is amended—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00055   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   56
                                                                          1                        (1) in clause (i), by striking ‘‘and’’ at the end;
                                                                          2                        (2) by redesignating clause (ii) as clause (iii);
                                                                          3               and
                                                                          4                        (3) by inserting after clause (i) the following:
                                                                          5                                         ‘‘(ii) the Secretary shall not include
                                                                          6                                  proposals in the appendix of the annual re-
                                                                          7                                  port that otherwise meet the criteria for in-
                                                                          8                                  clusion in the annual report solely on the
                                                                          9                                  basis that the proposals are for the purposes
                                                                       10                                    of navigation, flood risk management, eco-
                                                                       11                                    system restoration, or municipal or agricul-
                                                                       12                                    tural water supply; and’’.
                                                                       13          SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRATION PRO-

                                                                       14                                   GRAM.

                                                                       15                 (a) IN GENERAL.—The Secretary shall carry out a
                                                                       16 demonstration program to determine the causes of, and im-
                                                                       17 plement measures to effectively detect, prevent, treat, and
                                                                       18 eliminate, harmful algal blooms associated with water re-
                                                                       19 sources development projects.
                                                                       20                 (b) CONSULTATION; USE OF EXISTING DATA AND PRO-
                                                                       21          GRAM AUTHORITIES.—In carrying out the demonstration

                                                                       22 program under subsection (a), the Secretary shall—
                                                                       23                          (1) consult with the heads of appropriate Federal
                                                                       24                 and State agencies; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00056   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  57
                                                                          1                       (2) make maximum use of existing Federal and
                                                                          2              State data and ongoing programs and activities of
                                                                          3              Federal and State agencies, including the activities of
                                                                          4              the Secretary carried out through the Engineer Re-
                                                                          5              search and Development Center pursuant to section
                                                                          6              1109 of the Water Resources Development Act of 2018
                                                                          7              (33 U.S.C. 610 note).
                                                                          8              (c) FOCUS AREAS.—In carrying out the demonstration
                                                                          9 program under subsection (a), the Secretary shall undertake
                                                                       10 program activities related to harmful algal blooms in the
                                                                       11 Great Lakes, the tidal and inland waters of the State of
                                                                       12 New Jersey, the coastal and tidal waters of the State of Lou-
                                                                       13 isiana, the waterways of the counties that comprise the Sac-
                                                                       14 ramento-San Joaquin Delta, California, and Lake Okee-
                                                                       15 chobee, Florida.
                                                                       16          SEC. 129. UPDATE ON INVASIVE SPECIES POLICY GUID-

                                                                       17                                  ANCE.

                                                                       18                (a) IN GENERAL.—The Secretary shall periodically
                                                                       19 update the Invasive Species Policy Guidance, developed
                                                                       20 under section 104 of the River and Harbor Act of 1958 (33
                                                                       21 U.S.C. 610) and the Nonindigenous Aquatic Nuisance Pre-
                                                                       22 vention and Control Act of 1990 (16 U.S.C. 4701 et seq.),
                                                                       23 in accordance with the most recent National Invasive Spe-
                                                                       24 cies Council Management Plan developed pursuant to Exec-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 utive Order 13112.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00057   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   58
                                                                          1               (b) INCLUSION.—The Secretary may include in the up-
                                                                          2 dated guidance invasive species specific efforts at federally
                                                                          3 authorized water resources development projects located
                                                                          4 in—
                                                                          5                        (1) high-altitude lakes; and
                                                                          6                        (2) the Tennessee and Cumberland River basins.
                                                                          7        SEC. 130. REPORT ON DEBRIS REMOVAL.

                                                                          8               Section 1210 of the Water Resources Development Act
                                                                          9 of 2018 (132 Stat. 3808) is amended to read as follows:
                                                                       10          ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.

                                                                       11                 ‘‘Not later than 180 days after the date of enactment
                                                                       12 of the Water Resources Development Act of 2020, the Sec-
                                                                       13 retary shall submit to Congress and make publicly available
                                                                       14 a report that describes—
                                                                       15                          ‘‘(1) the extent to which, during the 10 fiscal
                                                                       16                 years prior to such date of enactment, the Secretary
                                                                       17                 has carried out section 3 of the Act of March 2, 1945
                                                                       18                 (33 U.S.C. 603a);
                                                                       19                          ‘‘(2) how the Secretary has evaluated potential
                                                                       20                 work to be carried out under that section; and
                                                                       21                          ‘‘(3) the extent to which the Secretary plans to
                                                                       22                 start, continue, or complete debris removal activities
                                                                       23                 in the 3 years following submission of the report.’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00058   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   59
                                                                          1        SEC. 131. MISSOURI RIVER INTERCEPTION-REARING COM-

                                                                          2                                 PLEX CONSTRUCTION.

                                                                          3               (a) REPORT.—Not later than 1 year after the date of
                                                                          4 enactment of this Act, and annually thereafter, the Sec-
                                                                          5 retary shall submit to the Committee on Transportation
                                                                          6 and Infrastructure of the House of Representatives and the
                                                                          7 Committee on Environment and Public Works of the Senate
                                                                          8 a report on the effects of any interception-rearing complex
                                                                          9 constructed on the Missouri River on—
                                                                       10                          (1) flood risk management and navigation; and
                                                                       11                          (2) the population recovery of the pallid stur-
                                                                       12                 geon, including baseline population counts.
                                                                       13                 (b) NO ADDITIONAL IRC CONSTRUCTION.—The Sec-
                                                                       14 retary may not authorize construction of an interception-
                                                                       15 rearing complex on the Missouri River until the Sec-
                                                                       16 retary—
                                                                       17                          (1) submits the report required by subsection (a);
                                                                       18                          (2) acting through the Engineer Research and
                                                                       19                 Development Center, conducts further research on
                                                                       20                 interception-rearing complex design, including any
                                                                       21                 effects on existing flows, flood risk management, and
                                                                       22                 navigation; and
                                                                       23                          (3) develops a plan—
                                                                       24                                    (A) to repair dikes and revetments that are




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          affecting flood risk and bank erosion; and


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00059   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   60
                                                                          1                                 (B) to establish, repair, or improve water
                                                                          2                        control structures at the headworks of constructed
                                                                          3                        shallow water habitat side-channels.
                                                                          4               (c) FUTURE IRC CONSTRUCTION.—
                                                                          5                        (1) PUBLIC COMMENT.—The Secretary shall pro-
                                                                          6               vide an opportunity for comment from the public and
                                                                          7               the Governor of each affected State on any proposals
                                                                          8               to construct an interception-rearing complex after the
                                                                          9               date of enactment of this Act.
                                                                       10                          (2) PERIOD.—The public comment period re-
                                                                       11                 quired by paragraph (1) shall be not less than 90
                                                                       12                 days for each proposal to construct an interception-
                                                                       13                 rearing complex on the Missouri River.
                                                                       14          SEC. 132. COST AND BENEFIT FEASIBILITY ASSESSMENT.

                                                                       15                 (a) IN GENERAL.—Section 5(a)(2)(B) of the Act of Au-
                                                                       16 gust 18, 1941 (33 U.S.C. 701n(a)(2)(B)) is amended—
                                                                       17                          (1) in clause (i)(I), by inserting ‘‘, or provide
                                                                       18                 contributions equal to,’’ after ‘‘pay’’; and
                                                                       19                          (2) in clause (ii)—
                                                                       20                                   (A) in the heading, by inserting ‘‘AND CON-
                                                                       21                          TRIBUTIONS’’ after ‘‘OF PAYMENTS’’;

                                                                       22                                   (B) by inserting ‘‘or contributions’’ after
                                                                       23                          ‘‘Non-Federal payments’’; and
                                                                       24                                   (C) by inserting ‘‘or contributions’’ after



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          ‘‘non-Federal payments’’.


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00060   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   61
                                                                          1               (b) CONTINUED ELIGIBILITY.—Section 1161(b) of the
                                                                          2 Water Resources Development Act of 2018 (33 U.S.C. 701n
                                                                          3 note) is amended—
                                                                          4                        (1) in the matter preceding paragraph (1)—
                                                                          5                                  (A) by striking the ‘‘three fiscal years pre-
                                                                          6                        ceding’’ and inserting ‘‘five fiscal years pre-
                                                                          7                        ceding’’; and
                                                                          8                                  (B) by striking ‘‘last day of the third fiscal
                                                                          9                        year’’ and inserting ‘‘last day of the fifth fiscal
                                                                       10                          year’’;
                                                                       11                          (2) in paragraph (1), by inserting ‘‘, or provide
                                                                       12                 contributions equal to,’’ before ‘‘an amount suffi-
                                                                       13                 cient’’; and
                                                                       14                          (3) by striking paragraph (2) and inserting the
                                                                       15                 following:
                                                                       16                          ‘‘(2) the Secretary determines that the damage to
                                                                       17                 the structure was not as a result of negligent oper-
                                                                       18                 ation or maintenance.’’.
                                                                       19          SEC. 133. MATERIALS, SERVICES, AND FUNDS FOR REPAIR,

                                                                       20                                   RESTORATION,                 OR        REHABILITATION          OF

                                                                       21                                   PROJECTS.

                                                                       22                 (a) IN GENERAL.—In any area covered by an emer-
                                                                       23 gency or major disaster declaration declared under the Rob-
                                                                       24 ert T. Stafford Disaster Relief and Emergency Assistance



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 Act (42 U.S.C. 5121 et seq.), the Secretary is authorized


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00061   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  62
                                                                          1 to accept and use materials, services, and funds, during the
                                                                          2 period the declaration is in effect, from a non-Federal inter-
                                                                          3 est or private entity to repair, restore, or rehabilitate a fed-
                                                                          4 erally authorized water resources development project, and
                                                                          5 to provide reimbursement to such non-Federal interest or
                                                                          6 private entity for such materials, services, and funds, in
                                                                          7 the Secretary’s sole discretion, and subject to the avail-
                                                                          8 ability of appropriations, if the Secretary determines that
                                                                          9 reimbursement is in the public interest.
                                                                       10                (b) ADDITIONAL REQUIREMENT.—The Secretary may
                                                                       11 only reimburse for the use of materials or services accepted
                                                                       12 under this section if such materials or services meet the Sec-
                                                                       13 retary’s specifications and comply with all applicable laws
                                                                       14 and regulations that would apply if such materials and
                                                                       15 services were acquired by the Secretary, including sections
                                                                       16 3141 through 3148 and 3701 through 3708 of title 40,
                                                                       17 United States Code, section 8302 of title 41, United States
                                                                       18 Code, and the National Environmental Policy Act of 1969.
                                                                       19                (c) AGREEMENTS.—
                                                                       20                         (1) IN GENERAL.—Prior to the acceptance of ma-
                                                                       21                terials, services, or funds under this section, the Sec-
                                                                       22                retary and the non-Federal interest shall enter into
                                                                       23                an agreement that specifies—
                                                                       24                                  (A) the non-Federal interest shall hold and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         save the United States free from any and all


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00062   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   63
                                                                          1                        damages that arise from use of materials or serv-
                                                                          2                        ices of the non-Federal interest, except for dam-
                                                                          3                        ages due to the fault or negligence of the United
                                                                          4                        States or its contractors;
                                                                          5                                 (B) the non-Federal interest shall certify
                                                                          6                        that the materials or services comply with all
                                                                          7                        applicable laws and regulations under subsection
                                                                          8                        (b); and
                                                                          9                                 (C) any other term or condition required by
                                                                       10                          the Secretary.
                                                                       11                          (2) EXCEPTION.—If an agreement under para-
                                                                       12                 graph (1) was not entered prior to materials or serv-
                                                                       13                 ices being contributed, a non-Federal interest shall
                                                                       14                 enter into an agreement with the Secretary that—
                                                                       15                                   (A) specifies the value, as determined by the
                                                                       16                          Secretary, of those materials or services contrib-
                                                                       17                          uted and eligible for reimbursement; and
                                                                       18                                   (B) ensures that the materials or services
                                                                       19                          comply with subsection (b) and paragraph (1).
                                                                       20          SEC. 134. LEVEE SAFETY.

                                                                       21                 Section 9004 of the Water Resources Development Act
                                                                       22 of 2007 (33 U.S.C. 3303) is amended by adding at the end
                                                                       23 the following:
                                                                       24                 ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00063   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   64
                                                                          1                        ‘‘(1) IN GENERAL.—For each levee included in
                                                                          2               an inventory established under subsection (b) or for
                                                                          3               which the Secretary has conducted a review under
                                                                          4               subsection (c), the Secretary shall—
                                                                          5                                 ‘‘(A) identify the specific engineering and
                                                                          6                        maintenance deficiencies, if any; and
                                                                          7                                 ‘‘(B) describe the recommended remedies to
                                                                          8                        correct each deficiency identified under subpara-
                                                                          9                        graph (A), and, if requested by owner of a non-
                                                                       10                          Federal levee, the associated costs of those rem-
                                                                       11                          edies.
                                                                       12                          ‘‘(2) CONSULTATION.—In identifying deficiencies
                                                                       13                 and describing remedies for a levee under paragraph
                                                                       14                 (1), the Secretary shall consult with relevant non-Fed-
                                                                       15                 eral interests, including by providing an opportunity
                                                                       16                 for comment by those non-Federal interests.’’.
                                                                       17          SEC. 135. NATIONAL DAM SAFETY PROGRAM.

                                                                       18                 (a) DEFINITIONS.—Section 2 of the National Dam
                                                                       19 Safety Program Act (33 U.S.C. 467) is amended—
                                                                       20                          (1) in paragraph (4)—
                                                                       21                                   (A) in subparagraph (A)—
                                                                       22                                           (i) by striking clause (iii) and insert-
                                                                       23                                   ing the following:
                                                                       24                                           ‘‘(iii) has an emergency action plan



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                   that—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00064   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  65
                                                                          1                                                 ‘‘(I) is approved by the relevant
                                                                          2                                        State dam safety agency; or
                                                                          3                                                 ‘‘(II) is in conformance with
                                                                          4                                        State law and pending approval by the
                                                                          5                                        relevant State dam safety agency;’’;
                                                                          6                                        and
                                                                          7                                        (ii) by striking clause (iv) and insert-
                                                                          8                                ing the following:
                                                                          9                                        ‘‘(iv) fails to meet minimum dam safe-
                                                                       10                                  ty standards of the State in which the dam
                                                                       11                                  is located, as determined by the State; and
                                                                       12                                          ‘‘(v) poses an unacceptable risk to the
                                                                       13                                  public, as determined by the Administrator,
                                                                       14                                  in consultation with the Board.’’; and
                                                                       15                                  (B) in subparagraph (B)(i), by inserting
                                                                       16                         ‘‘under a hydropower project with an authorized
                                                                       17                         installed            capacity               of     greater          than   1.5
                                                                       18                         megawatts’’ after ‘‘dam’’; and
                                                                       19                         (2) in paragraph (10)—
                                                                       20                                  (A) in the heading, by striking ‘‘NON-FED-
                                                                       21                         ERAL SPONSOR’’ and inserting ‘‘ELIGIBLE SUB-

                                                                       22                         RECIPIENT’’; and

                                                                       23                                  (B) by striking ‘‘The term ‘non-Federal
                                                                       24                         sponsor’ ’’ and inserting ‘‘The term ‘eligible sub-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         recipient’ ’’.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00065   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  66
                                                                          1              (b) REHABILITATION OF HIGH HAZARD POTENTIAL
                                                                          2 DAMS.—
                                                                          3                       (1)       ESTABLISHMENT                      OF      PROGRAM.—Section

                                                                          4              8A(a) of the National Dam Safety Program Act (33
                                                                          5              U.S.C. 467f–2(a)) is amended by striking ‘‘to non-
                                                                          6              Federal sponsors’’ and inserting ‘‘to States with dam
                                                                          7              safety programs’’.
                                                                          8                       (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of the
                                                                          9              National Dam Safety Program Act (33 U.S.C. 467f–
                                                                       10                2(b)) is amended, in the matter preceding paragraph
                                                                       11                (1), by striking ‘‘for a project may be used for’’ and
                                                                       12                inserting ‘‘to a State may be used by the State to
                                                                       13                award grants to eligible subrecipients for’’.
                                                                       14                         (3) AWARD OF GRANTS.—Section 8A(c) of the
                                                                       15                National Dam Safety Program Act (33 U.S.C. 467f–
                                                                       16                2(c)) is amended—
                                                                       17                                  (A) in paragraph (1)(A), by striking ‘‘non-
                                                                       18                         Federal sponsor’’ and inserting ‘‘State’’; and
                                                                       19                                  (B) in paragraph (2)—
                                                                       20                                          (i) in subparagraph (A), by striking
                                                                       21                                  ‘‘an eligible high hazard potential dam to a
                                                                       22                                  non-Federal sponsor’’ and inserting ‘‘eligi-
                                                                       23                                  ble high hazard potential dams to a State’’;
                                                                       24                                          (ii) in subparagraph (B)—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00066   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  67
                                                                          1                                                 (I) in the subparagraph heading,
                                                                          2                                        by striking ‘‘PROJECT GRANT’’ and in-
                                                                          3                                        serting ‘‘GRANT’’;
                                                                          4                                                 (II) by striking ‘‘project grant
                                                                          5                                        agreement with the non-Federal spon-
                                                                          6                                        sor’’ and inserting ‘‘grant agreement
                                                                          7                                        with the State’’; and
                                                                          8                                                 (III) by striking ‘‘project,’’ and
                                                                          9                                        inserting ‘‘projects for which the grant
                                                                       10                                          is awarded,’’;
                                                                       11                                          (iii) by amending subparagraph (C) to
                                                                       12                                  read as follows:
                                                                       13                                  ‘‘(C) GRANT                 ASSURANCE.—As                  part of a
                                                                       14                         grant agreement under subparagraph (B), the
                                                                       15                         Administrator shall require that each eligible
                                                                       16                         subrecipient to which the State awards a grant
                                                                       17                         under this section provides an assurance, with
                                                                       18                         respect to the dam to be rehabilitated by the eli-
                                                                       19                         gible subrecipient, that the dam owner will carry
                                                                       20                         out a plan for maintenance of the dam during
                                                                       21                         the expected life of the dam.’’; and
                                                                       22                                          (iv) in subparagraph (D), by striking
                                                                       23                                  ‘‘A grant provided under this section shall
                                                                       24                                  not exceed’’ and inserting ‘‘A State may not



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  award a grant to an eligible subrecipient


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00067   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  68
                                                                          1                                under this section that exceeds, for any 1
                                                                          2                                dam,’’.
                                                                          3                       (4) REQUIREMENTS.—Section 8A(d) of the Na-
                                                                          4              tional Dam Safety Program Act (33 U.S.C. 467f–
                                                                          5              2(d)) is amended—
                                                                          6                                (A) in paragraph (1), by inserting ‘‘to an
                                                                          7                       eligible subrecipient’’ after ‘‘this section’’;
                                                                          8                                (B) in paragraph (2)—
                                                                          9                                        (i) in the paragraph heading, by strik-
                                                                       10                                  ing ‘‘NON-FEDERAL SPONSOR’’ and insert-
                                                                       11                                  ing ‘‘ELIGIBLE SUBRECIPIENT’’;
                                                                       12                                          (ii) in the matter preceding subpara-
                                                                       13                                  graph (A), by striking ‘‘the non-Federal
                                                                       14                                  sponsor shall’’ and inserting ‘‘an eligible
                                                                       15                                  subrecipient shall, with respect to the dam
                                                                       16                                  to be rehabilitated by the eligible sub-
                                                                       17                                  recipient’’;
                                                                       18                                          (iii) in subparagraph (A), by striking
                                                                       19                                  ‘‘participate in, and comply with,’’ and in-
                                                                       20                                  serting ‘‘demonstrate that the community in
                                                                       21                                  which the dam is located participates in,
                                                                       22                                  and complies with,’’;
                                                                       23                                          (iv) in subparagraph (B), by striking
                                                                       24                                  ‘‘have’’ and inserting ‘‘beginning not later



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  than 2 years after the date on which the Ad-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00068   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  69
                                                                          1                                ministrator publishes criteria for hazard
                                                                          2                                mitigation plans under paragraph (3),
                                                                          3                                demonstrate that the Tribal or local govern-
                                                                          4                                ment with jurisdiction over the area in
                                                                          5                                which the dam is located has’’; and
                                                                          6                                        (v) in subparagraph (C), by striking
                                                                          7                                ‘‘50-year period’’ and inserting ‘‘expected
                                                                          8                                life of the dam’’; and
                                                                          9                                (C) by adding at the end the following:
                                                                       10                         ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—Not
                                                                       11                later than 1 year after the date of enactment of this
                                                                       12                paragraph, the Administrator, in consultation with
                                                                       13                the Board, shall publish criteria for hazard mitiga-
                                                                       14                tion plans required under paragraph (2)(B).’’.
                                                                       15                         (5) FLOODPLAIN MANAGEMENT PLANS.—Section
                                                                       16                8A(e) of the National Dam Safety Program Act (33
                                                                       17                U.S.C. 467f–2(e)) is amended—
                                                                       18                                  (A) in paragraph (1)—
                                                                       19                                          (i) in the matter preceding subpara-
                                                                       20                                  graph (A), by striking ‘‘the non-Federal
                                                                       21                                  sponsor’’ and inserting ‘‘an eligible sub-
                                                                       22                                  recipient’’; and
                                                                       23                                          (ii) in subparagraph (B), by striking
                                                                       24                                  ‘‘1 year’’ and inserting ‘‘2 years’’ each place



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  it appears; and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00069   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   70
                                                                          1                                  (B) by striking paragraph (3) and inserting
                                                                          2                        the following:
                                                                          3                        ‘‘(3) PLAN               CRITERIA             AND       TECHNICAL       SUP-

                                                                          4               PORT.—The Administrator, in consultation with the

                                                                          5               Board, shall provide criteria, and may provide tech-
                                                                          6               nical support, for the development and implementa-
                                                                          7               tion of floodplain management plans prepared under
                                                                          8               this subsection.’’.
                                                                          9                        (6)        CONTRACTUAL                      REQUIREMENTS.—Section

                                                                       10                 8A(i)(1) of the National Dam Safety Program Act
                                                                       11                 (33 U.S.C. 467f–2(i)(1)) is amended by striking ‘‘a
                                                                       12                 non-Federal sponsor’’ and inserting ‘‘an eligible sub-
                                                                       13                 recipient’’.
                                                                       14          SEC. 136. REHABILITATION OF CORPS OF ENGINEERS CON-

                                                                       15                                   STRUCTED PUMP STATIONS.

                                                                       16                 (a) DEFINITIONS.—In this section:
                                                                       17                          (1) ELIGIBLE PUMP STATION.—The term ‘‘eligi-
                                                                       18                 ble pump station’’ means a pump station—
                                                                       19                                    (A) constructed, in whole or in part, by the
                                                                       20                          Corps of Engineers for flood risk management
                                                                       21                          purposes;
                                                                       22                                    (B) that the Secretary has identified as hav-
                                                                       23                          ing a major deficiency; and
                                                                       24                                    (C) the failure of which the Secretary has



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          determined would impair the function of a flood


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00070   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  71
                                                                          1                       risk management project constructed by the
                                                                          2                       Corps of Engineers.
                                                                          3                       (2) REHABILITATION.—
                                                                          4                                (A) IN GENERAL.—The term ‘‘rehabilita-
                                                                          5                       tion’’, with respect to an eligible pump station,
                                                                          6                       means to address a major deficiency of the eligi-
                                                                          7                       ble pump station caused by long-term degrada-
                                                                          8                       tion of the foundation, construction materials, or
                                                                          9                       engineering systems or components of the eligible
                                                                       10                         pump station.
                                                                       11                                  (B) INCLUSIONS.—The term ‘‘rehabilita-
                                                                       12                         tion’’, with respect to an eligible pump station,
                                                                       13                         includes—
                                                                       14                                          (i) the incorporation into the eligible
                                                                       15                                  pump station of—
                                                                       16                                                   (I) current design standards;
                                                                       17                                                   (II) efficiency improvements; and
                                                                       18                                                   (III) associated drainage; and
                                                                       19                                          (ii) increasing the capacity of the eligi-
                                                                       20                                  ble pump station, subject to the condition
                                                                       21                                  that the increase shall—
                                                                       22                                                   (I) significantly decrease the risk
                                                                       23                                          of loss of life and property damage; or




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00071   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  72
                                                                          1                                                 (II) decrease total lifecycle reha-
                                                                          2                                        bilitation costs for the eligible pump
                                                                          3                                        station.
                                                                          4              (b) AUTHORIZATION.—The Secretary may carry out
                                                                          5 rehabilitation of an eligible pump station, if the Secretary
                                                                          6 determines that the rehabilitation is feasible.
                                                                          7              (c) COST SHARING.—The non-Federal interest for the
                                                                          8 eligible pump station shall—
                                                                          9                       (1) provide 35 percent of the cost of rehabilita-
                                                                       10                tion of an eligible pump station carried out under
                                                                       11                this section; and
                                                                       12                         (2) provide all land, easements, rights-of-way,
                                                                       13                and necessary relocations associated with the rehabili-
                                                                       14                tation described in subparagraph (A), at no cost to
                                                                       15                the Federal Government.
                                                                       16                (d) AGREEMENT REQUIRED.—The rehabilitation of an
                                                                       17 eligible pump station pursuant to this section shall be initi-
                                                                       18 ated only after a non-Federal interest has entered into a
                                                                       19 binding agreement with the Secretary—
                                                                       20                         (1) to pay the non-Federal share of the costs of
                                                                       21                rehabilitation under subsection (c); and
                                                                       22                         (2) to pay 100 percent of the operation and
                                                                       23                maintenance costs of the rehabilitated eligible pump
                                                                       24                station, in accordance with regulations promulgated



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                by the Secretary.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00072   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   73
                                                                          1               (e) TREATMENT.—The rehabilitation of an eligible
                                                                          2 pump station pursuant to this section shall not be consid-
                                                                          3 ered to be a separable element of the associated flood risk
                                                                          4 management project constructed by the Corps of Engineers.
                                                                          5               (f) AUTHORIZATION OF APPROPRIATIONS.—There is
                                                                          6 authorized to be appropriated to carry out this section
                                                                          7 $60,000,000, to remain available until expended.
                                                                          8        SEC. 137. NON-FEDERAL PROJECT IMPLEMENTATION PILOT

                                                                          9                                 PROGRAM.

                                                                       10                 Section 1043(b) of the Water Resources Reform and
                                                                       11 Development Act of 2014 (33 U.S.C. 2201 note) is amend-
                                                                       12 ed—
                                                                       13                          (1) in paragraph (7), by striking ‘‘the date that
                                                                       14                 is 5 years after the date of enactment of this Act’’ and
                                                                       15                 inserting ‘‘September 30, 2026’’;
                                                                       16                          (2) in paragraph (8), by striking ‘‘2023’’ and in-
                                                                       17                 serting ‘‘2026’’; and
                                                                       18                          (3) by adding at the end the following:
                                                                       19                          ‘‘(9) IMPLEMENTATION GUIDANCE.—
                                                                       20                                    ‘‘(A) IN         GENERAL.—Not                    later than 120
                                                                       21                          days after the date of enactment of this para-
                                                                       22                          graph, the Secretary shall issue guidance for the
                                                                       23                          implementation of the pilot program that, to the
                                                                       24                          extent practicable, identifies—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00073   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  74
                                                                          1                                        ‘‘(i) the metrics for measuring the suc-
                                                                          2                                cess of the pilot program;
                                                                          3                                        ‘‘(ii) a process for identifying future
                                                                          4                                projects to participate in the pilot program;
                                                                          5                                        ‘‘(iii) measures to address the risks of
                                                                          6                                a non-Federal interest constructing projects
                                                                          7                                under the pilot program, including which
                                                                          8                                entity bears the risk for projects that fail to
                                                                          9                                meet the Corps of Engineers standards for
                                                                       10                                  design or quality;
                                                                       11                                          ‘‘(iv) the laws and regulations that a
                                                                       12                                  non-Federal interest must follow in car-
                                                                       13                                  rying out a project under the pilot program;
                                                                       14                                  and
                                                                       15                                          ‘‘(v) which entity bears the risk in the
                                                                       16                                  event that a project carried out under the
                                                                       17                                  pilot program fails to be carried out in ac-
                                                                       18                                  cordance with the project authorization or
                                                                       19                                  this subsection.
                                                                       20                                  ‘‘(B) NEW PROJECT PARTNERSHIP AGREE-
                                                                       21                         MENTS.—The                Secretary may not enter into a
                                                                       22                         project partnership agreement under this sub-
                                                                       23                         section during the period beginning on the date
                                                                       24                         of enactment of this paragraph and ending on



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00074   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   75
                                                                          1                        the date on which the Secretary issues the guid-
                                                                          2                        ance under subparagraph (A).’’.
                                                                          3        SEC. 138. DEFINITION OF ECONOMICALLY DISADVANTAGED

                                                                          4                                 COMMUNITY.

                                                                          5               (a) IN GENERAL.—Not later than 180 days after the
                                                                          6 date of enactment of this Act, the Secretary shall issue guid-
                                                                          7 ance defining the term ‘‘economically disadvantaged com-
                                                                          8 munity’’ for the purposes of this Act and the amendments
                                                                          9 made by this Act.
                                                                       10                 (b) CONSIDERATIONS.—In defining the term ‘‘economi-
                                                                       11 cally disadvantaged community’’ under subsection (a), the
                                                                       12 Secretary shall, to the maximum extent practicable, utilize
                                                                       13 the criteria under paragraphs (1) or (2) of section 301(a)
                                                                       14 of the Public Works and Economic Development Act of 1965
                                                                       15 (42 U.S.C. 3161), to the extent that such criteria are appli-
                                                                       16 cable in relation to the development of water resources devel-
                                                                       17 opment projects.
                                                                       18          SEC. 139. COST SHARING PROVISIONS FOR TERRITORIES

                                                                       19                                   AND INDIAN TRIBES.

                                                                       20                 Section 1156(b) of the Water Resources Development
                                                                       21 Act of 1986 (33 U.S.C. 2310(b)) is amended by striking
                                                                       22 ‘‘inflation’’ and all that follows through the period at the
                                                                       23 end and inserting ‘‘on an annual basis for inflation.’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00075   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   76
                                                                          1        SEC. 140. FLOOD CONTROL AND OTHER PURPOSES.

                                                                          2               Section 103(k) of the Water Resources Development Act
                                                                          3 of 1986 (33 U.S.C. 2213) is amended—
                                                                          4                        (1) by striking ‘‘Except as’’ and inserting the fol-
                                                                          5               lowing:
                                                                          6                        ‘‘(1) IN GENERAL.—Except as’’; and
                                                                          7                        (2) by adding at the end the following:
                                                                          8                        ‘‘(2) RENEGOTIATION OF TERMS.—
                                                                          9                                 ‘‘(A) IN GENERAL.—At the request of a non-
                                                                       10                          Federal interest, the Secretary and the non-Fed-
                                                                       11                          eral interest may renegotiate the terms and con-
                                                                       12                          ditions of an eligible deferred payment, includ-
                                                                       13                          ing—
                                                                       14                                           ‘‘(i) permitting the non-Federal con-
                                                                       15                                   tribution to be made without interest, pur-
                                                                       16                                   suant to paragraph (1);
                                                                       17                                           ‘‘(ii) recalculation of the interest rate;
                                                                       18                                           ‘‘(iii) full or partial forgiveness of in-
                                                                       19                                   terest accrued during the period of construc-
                                                                       20                                   tion; and
                                                                       21                                           ‘‘(iv) a credit against construction in-
                                                                       22                                   terest for a non-Federal investment that
                                                                       23                                   benefits the completion or performance of
                                                                       24                                   the project or separable element.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00076   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  77
                                                                          1                                ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An
                                                                          2                       eligible deferred payment agreement under sub-
                                                                          3                       paragraph (A) is an agreement for which—
                                                                          4                                        ‘‘(i) the non-Federal contribution was
                                                                          5                                made with interest;
                                                                          6                                        ‘‘(ii) the period of project construction
                                                                          7                                exceeds 10 years from the execution of a
                                                                          8                                project partnership agreement or appro-
                                                                          9                                priation of funds; and
                                                                       10                                          ‘‘(iii) the construction interest exceeds
                                                                       11                                  $45,000,000.
                                                                       12                                  ‘‘(C) CREDIT FOR NON-FEDERAL CONTRIBU-
                                                                       13                         TION.—

                                                                       14                                          ‘‘(i) IN GENERAL.—The Secretary is
                                                                       15                                  authorized to credit any costs incurred by
                                                                       16                                  the non-Federal interest (including in-kind
                                                                       17                                  contributions) to remedy a design or con-
                                                                       18                                  struction deficiency of a covered project or
                                                                       19                                  separable element toward the non-Federal
                                                                       20                                  share of the cost of the covered project, if the
                                                                       21                                  Secretary determines the remedy to be inte-
                                                                       22                                  gral to the completion or performance of the
                                                                       23                                  covered project.
                                                                       24                                          ‘‘(ii) CREDIT OF COSTS.—If the non-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  Federal interest incurs costs or in-kind con-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00077   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   78
                                                                          1                                 tributions for a project to remedy a design
                                                                          2                                 or construction deficiency of a project or
                                                                          3                                 separable element which has a 100 percent
                                                                          4                                 Federal cost share, and the Secretary deter-
                                                                          5                                 mines the remedy to be integral to the com-
                                                                          6                                 pletion or performance of the project, the
                                                                          7                                 Secretary is authorized to credit such costs
                                                                          8                                 to any interest accrued on a deferred non-
                                                                          9                                 Federal contribution.’’.
                                                                       10          SEC. 141. REVIEW OF CONTRACTING POLICIES.

                                                                       11                 (a) IN GENERAL.—Not later than 180 days after the
                                                                       12 date of enactment of this section, the Secretary shall com-
                                                                       13 plete a review of the policies, guidelines, and regulations
                                                                       14 of the Corps of Engineers for the development of contractual
                                                                       15 agreements between the Secretary and non-Federal interests
                                                                       16 and utilities associated with the construction of water re-
                                                                       17 sources development projects.
                                                                       18                 (b) REPORT.—Not later than 90 days after completing
                                                                       19 the review under subsection (a), the Secretary shall submit
                                                                       20 to the Committee on Transportation and Infrastructure of
                                                                       21 the House of Representatives and the Committee on Envi-
                                                                       22 ronment and Public Works of the Senate, and make publicly
                                                                       23 available, a report that includes—
                                                                       24                          (1) a summary of the results of the review; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00078   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   79
                                                                          1                        (2) public guidance on best practices for non-
                                                                          2               Federal interest to use when writing or developing
                                                                          3               contractual agreements with the Secretary and utili-
                                                                          4               ties.
                                                                          5               (c) PROVISION OF GUIDANCE.—The Secretary shall
                                                                          6 provide the best practices guidance included under sub-
                                                                          7 section (b)(2) to non-Federal interests prior to the develop-
                                                                          8 ment of contractual agreements.
                                                                          9        SEC. 142. BUY AMERICA.

                                                                       10                 With respect to all Corps of Engineers construction
                                                                       11 and rehabilitation contracts to be awarded after the date
                                                                       12 of enactment of this Act, the steel components furnished and
                                                                       13 delivered under such contracts shall be manufactured or fab-
                                                                       14 ricated in whole or substantial part in the United States
                                                                       15 with steel produced or made in the United States, its terri-
                                                                       16 tories, or possessions.
                                                                       17          SEC. 143. ANNUAL REPORT ON STATUS OF FEASIBILITY

                                                                       18                                   STUDIES.

                                                                       19                 Concurrent with each report submitted under section
                                                                       20 7001 of the Water Resources Reform and Development Act
                                                                       21 of 2014 (33 U.S.C. 2282d), the Secretary shall submit to
                                                                       22 the Committee on Transportation and Infrastructure of the
                                                                       23 House of Representatives and the Committee on Environ-
                                                                       24 ment and Public Works a report that provides for an ac-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 counting of all outstanding feasibility studies being con-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00079   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  80
                                                                          1 ducted by the Secretary, including, for each such study, its
                                                                          2 length, cost, and expected completion date.
                                                                          3                     TITLE II—STUDIES AND
                                                                          4                            REPORTS
                                                                          5        SEC. 201. AUTHORIZATION OF PROPOSED FEASIBILITY

                                                                          6                                STUDIES.

                                                                          7              (a) IN GENERAL.—The Secretary is authorized to con-
                                                                          8 duct a feasibility study for the following projects for water
                                                                          9 resources development and conservation and other purposes,
                                                                       10 as identified in the reports titled ‘‘Report to Congress on
                                                                       11 Future Water Resources Development’’ submitted to Con-
                                                                       12 gress pursuant to section 7001 of the Water Resources Re-
                                                                       13 form and Development Act of 2014 (33 U.S.C. 2282d) or
                                                                       14 otherwise reviewed by Congress:
                                                                       15                         (1) TONTO               CREEK,              GILA     RIVER,         ARIZONA.—

                                                                       16                Project for flood risk management, Tonto Creek, Gila
                                                                       17                River, Arizona.
                                                                       18                         (2) SULPHUR RIVER, ARKANSAS AND TEXAS.—
                                                                       19                Project for ecosystem restoration, Sulphur River, Ar-
                                                                       20                kansas and Texas.
                                                                       21                         (3) CABLE               CREEK,              CALIFORNIA.—Project           for
                                                                       22                flood risk management, water supply, and related
                                                                       23                benefits, Cable Creek, California.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00080   Fmt 6652   Sfmt 6203    E:\BILLS\H7575.RH   H7575
                                                                                                                                  81
                                                                          1                       (4) DEL MAR BLUFFS, CALIFORNIA.—Project for
                                                                          2              shoreline stabilization, Del Mar Bluffs, San Diego
                                                                          3              County, California.
                                                                          4                       (5) REDBANK                     AND     FANCHER             CREEKS,     CALI-

                                                                          5              FORNIA.—Project                  for water conservation and water
                                                                          6              supply, Redbank and Fancher Creeks, California.
                                                                          7                       (6) RIO HONDO CHANNEL, CALIFORNIA.—Project
                                                                          8              for ecosystem restoration, Rio Hondo Channel, San
                                                                          9              Gabriel River, California.
                                                                       10                         (7)       SOUTHERN                   CALIFORNIA,                CALIFORNIA.—

                                                                       11                Project for coastal storm damage reduction, Southern
                                                                       12                California.
                                                                       13                         (8) SHINGLE                 CREEK AND KISSIMMEE RIVER,

                                                                       14                FLORIDA.—Project                     for ecosystem restoration and
                                                                       15                water storage, Shingle Creek and Kissimmee River,
                                                                       16                Osceola County, Florida.
                                                                       17                         (9) ST. JOHN’S RIVER AND LAKE JESUP, FLOR-
                                                                       18                IDA.—Project              for ecosystem restoration, St. John’s
                                                                       19                River and Lake Jesup, Florida.
                                                                       20                         (10) WAIMEA RIVER, HAWAII.—Project for flood
                                                                       21                risk management, Waimea River, Kauai, Hawaii.
                                                                       22                         (11) CHICAGO AREA WATERWAYS SYSTEM, ILLI-
                                                                       23                NOIS.—Project                 for ecosystem restoration, recreation,
                                                                       24                and other purposes, Illinois River, Chicago River,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                Calumet River, Grand Calumet River, Little Calumet


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00081   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  82
                                                                          1              River, and other waterways in the vicinity of Chi-
                                                                          2              cago, Illinois.
                                                                          3                       (12) FOX RIVER, ILLINOIS.—Project for flood risk
                                                                          4              management, Fox River, Illinois.
                                                                          5                       (13) LOWER MISSOURI RIVER, KANSAS.—Project
                                                                          6              for bank stabilization and navigation, Lower Mis-
                                                                          7              souri River, Sioux City, Kansas.
                                                                          8                       (14) TANGIPAHOA PARISH, LOUISIANA.—Project
                                                                          9              for flood risk management, Tangipahoa Parish, Lou-
                                                                       10                isiana.
                                                                       11                         (15) KENT                NARROWS              AND       CHESTER         RIVER,

                                                                       12                MARYLAND.—Project                        for navigation, Kent Narrows
                                                                       13                and Chester River, Queen Anne’s County, Maryland.
                                                                       14                         (16) BOSTON,                    MASSACHUSETTS.—Project                     for
                                                                       15                hurricane and storm damage risk reduction, Boston,
                                                                       16                Massachusetts, pursuant to the comprehensive study
                                                                       17                authorized under the Disaster Relief Appropriations
                                                                       18                Act, 2013 (Public Law 113–2).
                                                                       19                         (17) LOWER ST. CROIX RIVER, MINNESOTA.—
                                                                       20                Project for flood risk management, ecosystem restora-
                                                                       21                tion, and recreation, Lower St. Croix River, Min-
                                                                       22                nesota.
                                                                       23                         (18) ESCATAWPA RIVER BASIN, MISSISSIPPI.—
                                                                       24                Project for flood risk management and ecosystem res-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00082   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  83
                                                                          1              toration, Escatawpa River, Jackson County, Mis-
                                                                          2              sissippi.
                                                                          3                       (19) LONG BEACH, BAY ST. LOUIS AND MIS-
                                                                          4              SISSIPPI SOUND, MISSISSIPPI.—Project for hurricane

                                                                          5              and storm damage risk reduction and flood risk man-
                                                                          6              agement, Long Beach, Bay St. Louis and Mississippi
                                                                          7              Sound, Mississippi.
                                                                          8                       (20) PASCAGOULA RIVER BASIN, MISSISSIPPI.—
                                                                          9              Project            for         comprehensive                   watershed         study,
                                                                       10                Pascagoula, Mississippi.
                                                                       11                         (21) TALLAHOMA AND TALLAHALA CREEKS, MIS-
                                                                       12                SISSIPPI.—Project                  for flood risk management, Leaf
                                                                       13                River, Jones County, Mississippi.
                                                                       14                         (22) LOWER OSAGE RIVER BASIN, MISSOURI.—
                                                                       15                Project for ecosystem restoration, Lower Osage River
                                                                       16                Basin, Missouri.
                                                                       17                         (23) UPPER BASIN AND STONY BROOK (GREEN
                                                                       18                BROOK SUB-BASIN), RARITAN RIVER BASIN, NEW JER-

                                                                       19                SEY.—Reevaluation                    of the Upper Basin and Stony
                                                                       20                Brook portions of the project for flood control, Green
                                                                       21                Brook Sub-basin, Raritan River Basin, New Jersey,
                                                                       22                authorized by section 401 of the Water Resources De-
                                                                       23                velopment Act of 1986 (100 Stat. 4119), including the
                                                                       24                evaluation of nonstructural measures to achieve the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                project purpose.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00083   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  84
                                                                          1                       (24) LAKE ONTARIO SHORELINE, NEW YORK.—
                                                                          2              Project for coastal storm resiliency, Lake Ontario
                                                                          3              shoreline, New York.
                                                                          4                       (25) WADING RIVER CREEK, NEW YORK.—Project
                                                                          5              for hurricane and storm damage risk reduction, flood
                                                                          6              risk management, navigation, and ecosystem restora-
                                                                          7              tion, Wading River Creek, New York.
                                                                          8                       (26) REEL                POINT         PRESERVE,                NEW     YORK.—

                                                                          9              Project for navigation and shoreline stabilization,
                                                                       10                Reel Point Preserve, New York.
                                                                       11                         (27) GOLDSMITH INLET, NEW YORK.—Project for
                                                                       12                navigation, Goldsmith Inlet, New York.
                                                                       13                         (28) TUSCARAWAS RIVER BASIN, OHIO.—Project
                                                                       14                for comprehensive watershed study, Tuscarawas River
                                                                       15                Basin, Ohio.
                                                                       16                         (29) LOWER COLUMBIA RIVER BASIN (TURNING
                                                                       17                BASIN), OREGON AND WASHINGTON.—Project                                            to im-
                                                                       18                prove turning basins for the project for navigation,
                                                                       19                Columbia River Channel, Oregon and Washington,
                                                                       20                authorized by section 101(b)(13) of the Water Re-
                                                                       21                sources Development Act of 1999 (113 Stat. 280).
                                                                       22                         (30)        WILLIAMSPORT,                    PENNSYLVANIA.—Project

                                                                       23                for flood risk management and levee rehabilitation,
                                                                       24                greater Williamsport, Pennsylvania.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00084   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  85
                                                                          1                       (31) CITY OF CHARLESTON, SOUTH CAROLINA.—
                                                                          2              Project for tidal- and inland-related flood risk man-
                                                                          3              agement, Charleston, South Carolina.
                                                                          4                       (32) TENNESSEE AND CUMBERLAND RIVER BA-
                                                                          5              SINS, TENNESSEE.—Project                             to deter, impede, or re-
                                                                          6              strict the dispersal of aquatic nuisance species in the
                                                                          7              Tennessee and Cumberland River Basins, Tennessee.
                                                                          8                       (33) SABINE PASS TO GALVESTON BAY, TEXAS.—
                                                                          9              Modification of the project for hurricane and storm
                                                                       10                damage risk reduction, Port Arthur and Orange
                                                                       11                County, Texas, authorized by section 203 of the Flood
                                                                       12                Control Act of 1962 (76 Stat. 1184), and authorized
                                                                       13                as a separable element of the project for Sabine Pass
                                                                       14                to Galveston Bay, authorized by item 3 of section
                                                                       15                1401(3) of the Water Resources Development Act of
                                                                       16                2018 (132 Stat. 3838), to reduce the risk of flooding
                                                                       17                through the construction of improvements to interior
                                                                       18                drainage.
                                                                       19                         (34) PORT              OF VICTORIA, TEXAS.—Project                      for
                                                                       20                flood risk management, Port of Victoria, Texas.
                                                                       21                         (35) LOWER FOX RIVER BASIN, WISCONSIN.—
                                                                       22                Project for comprehensive watershed study, Lower Fox
                                                                       23                River Basin, Wisconsin.
                                                                       24                         (36) UPPER FOX RIVER AND WOLF RIVER, WIS-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                CONSIN.—Project for flood risk management and eco-



                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00085   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   86
                                                                          1               system restoration, Upper Fox River and Wolf River,
                                                                          2               Wisconsin.
                                                                          3               (b) SPECIAL RULE.—The Secretary shall consider any
                                                                          4 study carried out by the Secretary to formulate the modi-
                                                                          5 fications to the project for hurricane and storm damage risk
                                                                          6 reduction, Port Arthur and Orange County, Texas, identi-
                                                                          7 fied in subsection (a)(33) to be a continuation of the study
                                                                          8 carried out for Sabine Pass to Galveston Bay, Texas, au-
                                                                          9 thorized by a resolution of the Committee on Environment
                                                                       10 and Public Works of the Senate, approved June 23, 2004,
                                                                       11 and funded by title IV of division B of the Bipartisan
                                                                       12 Budget Act of 2018, under the heading ‘‘Corps of Engi-
                                                                       13 neers—Civil—Department of the Army—Construction’’
                                                                       14 (Public Law 115–123; 132 Stat. 76).
                                                                       15          SEC. 202. EXPEDITED COMPLETIONS.

                                                                       16                 (a) FEASIBILITY REPORTS.—The Secretary shall expe-
                                                                       17 dite the completion of a feasibility study for each of the
                                                                       18 following projects, and if the Secretary determines that the
                                                                       19 project is justified in a completed report, may proceed di-
                                                                       20 rectly to preconstruction planning, engineering, and design
                                                                       21 of the project:
                                                                       22                          (1) Project for navigation, St. George Harbor,
                                                                       23                 Alaska.
                                                                       24                          (2) Project for shoreline stabilization, Aunu‘u



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 Harbor, American Samoa.


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00086   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  87
                                                                          1                       (3) Project for shoreline stabilization, Tutuila Is-
                                                                          2              land, American Samoa.
                                                                          3                       (4) Project for flood risk management, Lower
                                                                          4              Santa Cruz River, Arizona.
                                                                          5                       (5) Project for flood control, water conservation,
                                                                          6              and related purposes, Coyote Valley Dam, California.
                                                                          7                       (6) Project for flood damage reduction and eco-
                                                                          8              system restoration, Del Rosa Channel, city of San
                                                                          9              Bernardino, California.
                                                                       10                         (7) Project for flood risk management, Lower
                                                                       11                Cache Creek, California.
                                                                       12                         (8) Project for flood damage reduction and eco-
                                                                       13                system restoration, Mission-Zanja Channel, cities of
                                                                       14                San Bernardino and Redlands, California.
                                                                       15                         (9) Project for shoreline protection, Oceanside,
                                                                       16                California, authorized pursuant to section 414 of the
                                                                       17                Water Resources Development Act of 2000 (114 Stat.
                                                                       18                2636; 121 Stat. 1176).
                                                                       19                         (10) Project for flood risk management, Prado
                                                                       20                Basin, California.
                                                                       21                         (11) Project to modify the project for navigation,
                                                                       22                San Francisco Bay to Stockton, California.
                                                                       23                         (12) Project to modify the Seven Oaks Dam,
                                                                       24                California, portion of the project for flood control,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                Santa Ana River Mainstem, California, authorized


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00087   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  88
                                                                          1              by section 401(a) of the Water Resources Development
                                                                          2              Act of 1986 (100 Stat. 4113; 101 Stat. 1329–111; 104
                                                                          3              Stat. 4611; 110 Stat. 3713; 121 Stat. 1115), to in-
                                                                          4              clude water conservation as an authorized purpose.
                                                                          5                       (13) Project to modify the project for navigation,
                                                                          6              Delaware River Mainstem and Channel Deepening,
                                                                          7              Delaware, New Jersey, and Pennsylvania, authorized
                                                                          8              by section 101(6) of the Water Resources Development
                                                                          9              Act of 1992 (106 Stat. 4802; 113 Stat. 300; 114 Stat.
                                                                       10                2602), to include the construction of a turning basin
                                                                       11                located near the Packer Avenue Marine Terminal.
                                                                       12                         (14) Project for ecosystem restoration, Central
                                                                       13                and Southern Florida Project Canal 111 (C–111),
                                                                       14                South Dade County, Florida.
                                                                       15                         (15) Project for comprehensive hurricane and
                                                                       16                storm damage risk reduction and shoreline erosion
                                                                       17                protection, Chicago, Illinois, authorized by section
                                                                       18                101(a)(12) of the Water Resources Development Act of
                                                                       19                1996 (110 Stat. 3664; 113 Stat. 302).
                                                                       20                         (16) Project for flood risk management, Wheaton,
                                                                       21                DuPage County, Illinois.
                                                                       22                         (17) Project for flood damage reduction, eco-
                                                                       23                system restoration, and recreation, Blue River Basin,
                                                                       24                Kansas City, Kansas, carried out pursuant to the res-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                olution of the Committee on Transportation and In-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00088   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  89
                                                                          1              frastructure of the House of Representatives adopted
                                                                          2              on September 24, 2008 (docket number 2803).
                                                                          3                       (18) Project for flood control, Amite River and
                                                                          4              Tributaries east of the Mississippi River, Louisiana.
                                                                          5                       (19) Project for coastal storm risk management,
                                                                          6              Upper Barataria Basin, Louisiana.
                                                                          7                       (20) Project to replace the Bourne and Sagamore
                                                                          8              Bridges, Cape Cod, Massachusetts.
                                                                          9                       (21) Project to deepen the project for navigation,
                                                                       10                Gulfport Harbor, Mississippi, authorized by section
                                                                       11                202(a) of the Water Resources Development Act of
                                                                       12                1986 (100 Stat. 4094).
                                                                       13                         (22) Project for flood risk management, Rahway
                                                                       14                River Basin, New Jersey.
                                                                       15                         (23) Project for hurricane and storm damage
                                                                       16                risk reduction, Raritan Bay and Sandy Hook Bay,
                                                                       17                Highlands, New Jersey.
                                                                       18                         (24) Project for navigation, Shark River, New
                                                                       19                Jersey.
                                                                       20                         (25) Project for flood risk management, Rondout
                                                                       21                Creek-Wallkill River Watershed, New York, carried
                                                                       22                out pursuant to the resolution of the Committee on
                                                                       23                Transportation and Infrastructure of the House of
                                                                       24                Representatives adopted on May 2, 2007 (docket num-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                ber 2776).


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00089   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  90
                                                                          1                       (26) Project for ecosystem restoration and hurri-
                                                                          2              cane and storm damage risk reduction, Spring Creek
                                                                          3              South (Howard Beach), Queens, New York.
                                                                          4                       (27) Project to resolve increased silting and
                                                                          5              shoaling adjacent to the Federal channel, Port of
                                                                          6              Bandon, Coquille River, Oregon.
                                                                          7                       (28) Project for flood control, 42nd Street Levee,
                                                                          8              Springfield, Oregon, being carried out under section
                                                                          9              205 of the Flood Control Act of 1948 (33 U.S.C.
                                                                       10                701s).
                                                                       11                         (29) Project for ecosystem restoration, Hood
                                                                       12                River at the confluence with the Columbia River, Or-
                                                                       13                egon.
                                                                       14                         (30) Project for flood risk management, Rio
                                                                       15                Culebrinas, Puerto Rico.
                                                                       16                         (31) Project for flood risk management, Rio
                                                                       17                Grande de Manati, Puerto Rico.
                                                                       18                         (32) Project for flood risk management, Rio
                                                                       19                Guayanilla, Puerto Rico.
                                                                       20                         (33) Project for flood risk management, Dor-
                                                                       21                chester County, South Carolina.
                                                                       22                         (34) Project for navigation, Georgetown Harbor,
                                                                       23                South Carolina.
                                                                       24                         (35) Project for hurricane and storm damage



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                risk reduction, Myrtle Beach, South Carolina.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00090   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  91
                                                                          1                       (36) Project to modify the projects for navigation
                                                                          2              and other purposes, Old Hickory Lock and Dam and
                                                                          3              the Cordell Hull Dam and Reservoir, Cumberland
                                                                          4              River, Tennessee, authorized by the Act of July 24,
                                                                          5              1946 (chapter 595, 60 Stat. 636), to add flood risk
                                                                          6              management as an authorized purpose.
                                                                          7                       (37) Project for flood risk management, eco-
                                                                          8              system restoration, water supply, and related pur-
                                                                          9              poses, Lower Rio Grande River, Cameron County,
                                                                       10                Texas, carried out pursuant to the resolution of the
                                                                       11                Committee on Transportation and Infrastructure of
                                                                       12                the House of Representatives adopted on May 21,
                                                                       13                2003 (docket number 2710).
                                                                       14                         (38) Project for hurricane and storm damage
                                                                       15                risk reduction and shoreline erosion protection,
                                                                       16                Bolongo Bay, St. Thomas, United States Virgin Is-
                                                                       17                lands.
                                                                       18                         (39) Project for flood risk management, Savan
                                                                       19                Gut Phase II, St. Thomas, United States Virgin Is-
                                                                       20                lands.
                                                                       21                         (40) Project for flood risk management, Turpen-
                                                                       22                tine Run, St. Thomas, United States Virgin Islands.
                                                                       23                         (41) Project for navigation, North Landing
                                                                       24                Bridge, Atlantic Intracoastal Waterway, Virginia.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00091   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  92
                                                                          1              (b) POST-AUTHORIZATION CHANGE REPORTS.—The
                                                                          2 Secretary shall expedite completion of a post-authorization
                                                                          3 change report for the following projects:
                                                                          4                       (1) Project for ecosystem restoration, Tres Rios,
                                                                          5              Arizona.
                                                                          6                       (2) Project for flood control, San Luis Rey
                                                                          7              River, California.
                                                                          8                       (3) Project for ecosystem restoration, Central and
                                                                          9              Southern Florida Project Canal 111 (C–111), South
                                                                       10                Dade County, Florida.
                                                                       11                         (4) Project for ecosystem restoration, Comprehen-
                                                                       12                sive Everglades Restoration Plan, Caloosahatchee
                                                                       13                River C–43, West Basin Storage Reservoir, Florida.
                                                                       14                         (5) Project for flood risk management, Des
                                                                       15                Moines Levee System, including Birdland Park Levee,
                                                                       16                Des Moines and Raccoon Rivers, Des Moines, Iowa.
                                                                       17                (c) WATERSHED AND RIVER BASIN ASSESSMENTS.—
                                                                       18 The Secretary shall expedite the completion of an assess-
                                                                       19 ment under section 729 of the Water Resources Development
                                                                       20 Act of 1986 (33 U.S.C. 2267a), for the following:
                                                                       21                         (1) Kansas River Basin, Kansas.
                                                                       22                         (2) Merrimack River Basin, Massachusetts.
                                                                       23                (d) DISPOSITION STUDY.—The Secretary shall expe-
                                                                       24 dite the completion of a disposition study, carried out under



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 section 216 of the Flood Control Act of 1970 (33 U.S.C.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00092   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   93
                                                                          1 549a), for the project for Salinas Reservoir (Santa Mar-
                                                                          2 garita Lake), California.
                                                                          3        SEC. 203. FEASIBILITY STUDY MODIFICATIONS.

                                                                          4               (a) SAN FRANCISCO BAY, CALIFORNIA.—Section 142
                                                                          5 of the Water Resources Development Act of 1976 (90 Stat.
                                                                          6 2930) is amended—
                                                                          7                        (1) by inserting ‘‘, and along the ocean shoreline
                                                                          8               of San Mateo, San Francisco, and Marin Counties,’’
                                                                          9               after ‘‘Sacramento and San Joaquin Rivers’’;
                                                                       10                          (2) by inserting ‘‘and, with respect to the bay
                                                                       11                 and ocean shorelines of San Mateo, San Francisco,
                                                                       12                 and Marin Counties, the feasibility of and the Federal
                                                                       13                 interest in providing measures to adapt to rising sea
                                                                       14                 levels’’ after ‘‘tidal and fluvial flooding’’;
                                                                       15                          (3) by striking ‘‘investigation’’ and inserting in
                                                                       16                 its place ‘‘investigations’’; and
                                                                       17                          (4) by inserting after ‘‘San Francisco Bay re-
                                                                       18                 gion’’ the following: ‘‘and, with respect to the bay and
                                                                       19                 ocean shorelines and streams running to the bay and
                                                                       20                 ocean shorelines of San Mateo, San Francisco, and
                                                                       21                 Marin Counties, the effects of proposed measures or
                                                                       22                 improvements on the local economy; habitat restora-
                                                                       23                 tion, enhancement, or expansion efforts or opportuni-
                                                                       24                 ties; public infrastructure protection and improve-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 ment; stormwater runoff capacity and control meas-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00093   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  94
                                                                          1              ures, including those that may mitigate flooding; ero-
                                                                          2              sion of beaches and coasts; and any other measures or
                                                                          3              improvements relevant to adapting to rising sea lev-
                                                                          4              els’’.
                                                                          5              (b) SACRAMENTO RIVER, SOUTHERN SUTTER COUNTY,
                                                                          6 CALIFORNIA.—The study for flood control and allied pur-
                                                                          7 poses for the Sacramento River Basin, authorized by section
                                                                          8 209 of the Flood Control Act of 1962 (76 Stat. 1197), is
                                                                          9 modified to authorize the Secretary to conduct a study for
                                                                       10 flood risk management, southern Sutter County between the
                                                                       11 Sacramento River and Sutter Bypass, California.
                                                                       12                (c) SALTON SEA, CALIFORNIA.—In carrying out the
                                                                       13 program to implement projects to restore the Salton Sea,
                                                                       14 California, authorized by section 3032 of the Water Re-
                                                                       15 sources Development Act of 2007 (121 Stat. 1113; 130 Stat.
                                                                       16 1677), the Secretary is authorized to carry out a study for
                                                                       17 the construction of a perimeter lake, or a northern or south-
                                                                       18 ern subset thereof, for the Salton Sea, California.
                                                                       19                (d) NEW YORK AND NEW JERSEY HARBOR AND TRIB-
                                                                       20          UTARIES, NEW YORK AND NEW JERSEY.—The study for

                                                                       21 flood and storm damage reduction for the New York and
                                                                       22 New Jersey Harbor and Tributaries project, authorized by
                                                                       23 the Act of June 15, 1955 (chapter 140, 69 Stat. 132), and
                                                                       24 being carried out pursuant to the Disaster Relief Appro-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00094   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                   95
                                                                          1 priations Act, 2013 (Public Law 113–2), is modified to re-
                                                                          2 quire the Secretary to—
                                                                          3                        (1) evaluate and address the impacts of low-fre-
                                                                          4               quency precipitation and sea-level rise on the study
                                                                          5               area;
                                                                          6                        (2) consult with affected communities; and
                                                                          7                        (3) ensure the study is carried out in accordance
                                                                          8               with section 1001 of the Water Resources Reform and
                                                                          9               Development Act of 2014 (33 U.S.C. 2282c).
                                                                       10          SEC. 204. SELMA, ALABAMA.

                                                                       11                 Not later than 180 days after the date of enactment
                                                                       12 of this Act, the Secretary shall submit to the Committee on
                                                                       13 Transportation and Infrastructure of the House of Rep-
                                                                       14 resentatives and the Committee on Environment and Public
                                                                       15 Works of the Senate a report that—
                                                                       16                          (1) provides an update on the study for flood
                                                                       17                 risk management and riverbank stabilization, Selma,
                                                                       18                 Alabama, authorized by resolutions of the Committees
                                                                       19                 on Public Works and Rivers and Harbors of the
                                                                       20                 House of Representatives on June 7, 1961, and April
                                                                       21                 28, 1936, respectively, the completion of which the
                                                                       22                 Secretary was required to expedite by section 1203 of
                                                                       23                 the Water Resources Development Act of 2018 (132
                                                                       24                 Stat. 3803); and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          (2) identifies project alternatives necessary to—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00095   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  96
                                                                          1                                 (A) assure the preservation of cultural and
                                                                          2                       historic values associated with national historic
                                                                          3                       landmarks within the study area; and
                                                                          4                                 (B) provide flood risk management for eco-
                                                                          5                       nomically disadvantaged communities within the
                                                                          6                       study area.
                                                                          7        SEC. 205. COMPREHENSIVE STUDY OF THE SACRAMENTO

                                                                          8                                RIVER, YOLO BYPASS, CALIFORNIA.

                                                                          9              (a) COMPREHENSIVE STUDY.—The Secretary shall
                                                                       10 conduct a comprehensive study of the Sacramento River in
                                                                       11 the vicinity of the Yolo Bypass System, California, to iden-
                                                                       12 tify actions to be undertaken by the Secretary for the com-
                                                                       13 prehensive management of the Yolo Bypass System for the
                                                                       14 purposes of flood risk management, ecosystem restoration,
                                                                       15 water supply, hydropower, and recreation.
                                                                       16                (b) CONSULTATION AND USE OF EXISTING DATA.—
                                                                       17                         (1) CONSULTATION.—In conducting the com-
                                                                       18                prehensive study under subsection (a), the Secretary
                                                                       19                shall consult with the Governor of the State of Cali-
                                                                       20                fornia, applicable Federal, State, and local agencies,
                                                                       21                non-Federal interests, the Yolo Bypass and Cache
                                                                       22                Slough Partnership, and other stakeholders.
                                                                       23                         (2) USE OF EXISTING DATA AND PRIOR STUD-
                                                                       24                IES.—To the maximum extent practicable and where




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                appropriate, the Secretary may—


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00096   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  97
                                                                          1                                (A) make use of existing data provided to
                                                                          2                       the Secretary by the entities identified in para-
                                                                          3                       graph (1); and
                                                                          4                                (B) incorporate—
                                                                          5                                        (i) relevant information from prior
                                                                          6                                studies and projects carried out by the Sec-
                                                                          7                                retary within the study area; and
                                                                          8                                        (ii) the latest technical data and sci-
                                                                          9                                entific approaches to changing hydrologic
                                                                       10                                  and climatic conditions.
                                                                       11                (c) RECOMMENDATIONS.—
                                                                       12                         (1) IN GENERAL.—In conducting the comprehen-
                                                                       13                sive study under subsection (a), the Secretary may de-
                                                                       14                velop a recommendation to Congress for—
                                                                       15                                  (A) the construction of a water resources de-
                                                                       16                         velopment project;
                                                                       17                                  (B) the structural or operational modifica-
                                                                       18                         tion of an existing water resources development
                                                                       19                         project;
                                                                       20                                  (C) additional monitoring of, or adaptive
                                                                       21                         management measures to carry out with respect
                                                                       22                         to, existing water resources development projects,
                                                                       23                         to respond to changing hydrologic and climatic
                                                                       24                         conditions; or



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00097   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  98
                                                                          1                                (D) geographic areas within the Yolo By-
                                                                          2                       pass System for additional study by the Sec-
                                                                          3                       retary.
                                                                          4                       (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                          5              bility study carried out pursuant to a recommenda-
                                                                          6              tion under paragraph (1)(D) shall be considered to be
                                                                          7              a continuation of the comprehensive study authorized
                                                                          8              under subsection (a).
                                                                          9              (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—
                                                                       10 Not later than 3 years after the date of enactment of this
                                                                       11 section, the Secretary shall submit to the Committee on
                                                                       12 Transportation and Infrastructure of the House of Rep-
                                                                       13 resentatives and the Committee on Environment and Public
                                                                       14 Works of the Senate a report detailing—
                                                                       15                         (1) the results of the comprehensive study con-
                                                                       16                ducted under subsection (a), including any rec-
                                                                       17                ommendations developed under subsection (c);
                                                                       18                         (2) any additional, site-specific areas within the
                                                                       19                Yolo Bypass System where additional study for flood
                                                                       20                risk management or ecosystem restoration projects is
                                                                       21                recommended by the Secretary; and
                                                                       22                         (3) any interim actions relating to existing
                                                                       23                water resources development projects undertaken by
                                                                       24                the Secretary during the study period.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                (e) DEFINITIONS.—In this section:


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00098   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                  99
                                                                          1                       (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo By-
                                                                          2              pass System’’ means the system of weirs, levees, by-
                                                                          3              pass structures, and other water resources develop-
                                                                          4              ment projects in California’s Sacramento River Val-
                                                                          5              ley, extending from the Fremont Weir near Woodland,
                                                                          6              California, to the Sacramento River near Rio Vista,
                                                                          7              California, authorized pursuant to section 2 of the
                                                                          8              Act of March 1, 1917 (chapter 144; 39 Stat. 949).
                                                                          9                       (2) YOLO BYPASS AND CACHE CLOUGH PARTNER-
                                                                       10                SHIP.—The              term ‘‘Yolo Bypass and Cache Slough
                                                                       11                Partnership’’ means the group of parties to the Yolo
                                                                       12                Bypass and Cache Slough Memorandum of Under-
                                                                       13                standing, effective May 2016, regarding collaboration
                                                                       14                and cooperation in the Yolo Bypass and Cache Slough
                                                                       15                region.
                                                                       16          SEC. 206. LAKE OKEECHOBEE REGULATION SCHEDULE,

                                                                       17                                  FLORIDA.

                                                                       18                (a) IN GENERAL.—In carrying out the review of the
                                                                       19 Lake Okeechobee regulation schedule pursuant to section
                                                                       20 1106 of the Water Resources Development Act of 2018 (132
                                                                       21 Stat. 3773), the Secretary shall—
                                                                       22                         (1) evaluate the implications of prohibiting re-
                                                                       23                leases from Lake Okeechobee through the S–308 and
                                                                       24                S–80 lock and dam structures on the operation of the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                lake in accordance with authorized purposes and seek


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00099   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              100
                                                                          1              to minimize unnecessary releases to coastal estuaries;
                                                                          2              and
                                                                          3                       (2) to the maximum extent practicable, coordi-
                                                                          4              nate with the ongoing efforts of Federal and State
                                                                          5              agencies responsible for monitoring, forecasting, and
                                                                          6              notification of cyanobacteria levels in Lake Okee-
                                                                          7              chobee.
                                                                          8              (b) MONTHLY REPORT.—Each month, the Secretary
                                                                          9 shall make public a report, which may be based on the
                                                                       10 Water Management Daily Operational Reports, disclosing
                                                                       11 the volumes of water deliveries to or discharges from Lake
                                                                       12 Okeechobee & Vicinity, Water Conservation Area I, Water
                                                                       13 Conservation Area II, Water Conservation Area III, East
                                                                       14 Coast Canals, and the South Dade Conveyance. Such report
                                                                       15 shall be aggregated and reported in a format designed for
                                                                       16 the general public, using maps or other widely understood
                                                                       17 communication tools.
                                                                       18                (c) EFFECT.—In carrying out the evaluation under
                                                                       19 subsection (a)(1), nothing shall be construed to authorize
                                                                       20 any new purpose for the management of Lake Okeechobee
                                                                       21 or authorize the Secretary to affect any existing authorized
                                                                       22 purpose, including flood protection and management of
                                                                       23 Lake Okeechobee to provide water supply for all authorized
                                                                       24 users.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00100   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               101
                                                                          1        SEC. 207. GREAT LAKES COASTAL RESILIENCY STUDY.

                                                                          2               (a) IN GENERAL.—In carrying out the comprehensive
                                                                          3 assessment of water resources needs for the Great Lakes Sys-
                                                                          4 tem under section 729 of the Water Resources Development
                                                                          5 Act of 1986 (33 U.S.C. 2267a), as required by section 1219
                                                                          6 of the Water Resources Development Act of 2018 (132 Stat.
                                                                          7 3811), the Secretary shall—
                                                                          8                        (1) taking into account recent high lake levels
                                                                          9               within the Great Lakes, assess and make rec-
                                                                       10                 ommendations to Congress on—
                                                                       11                                   (A) coastal storm and flood risk manage-
                                                                       12                          ment measures, including measures that use nat-
                                                                       13                          ural features and nature-based features, as those
                                                                       14                          terms are defined in section 1184 of the Water
                                                                       15                          Resources Development Act of 2016 (33 U.S.C.
                                                                       16                          2289a);
                                                                       17                                   (B) operation and maintenance of the Great
                                                                       18                          Lakes Navigation System, as such term is de-
                                                                       19                          fined in section 210 of the Water Resources De-
                                                                       20                          velopment Act of 1986 (33 U.S.C. 2238);
                                                                       21                                   (C) ecosystem protection and restoration;
                                                                       22                                   (D) the prevention and control of invasive
                                                                       23                          species and the effects of invasive species; and
                                                                       24                                   (E) recreation associated with water re-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                          sources development projects;


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00101   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              102
                                                                          1                       (2) prioritize actions necessary to protect critical
                                                                          2              public infrastructure, communities, and critical nat-
                                                                          3              ural or cultural resources; and
                                                                          4                       (3) to the maximum extent practicable and
                                                                          5              where appropriate, utilize existing data provided to
                                                                          6              the Secretary by Federal and State agencies, Indian
                                                                          7              Tribes, and other stakeholders, including data ob-
                                                                          8              tained through other Federal programs.
                                                                          9              (b) RECOMMENDATIONS; ADDITIONAL STUDY.—
                                                                       10                         (1) IN         GENERAL.—In                   carrying out the com-
                                                                       11                prehensive assessment described in subsection (a), the
                                                                       12                Secretary may make a recommendation to Congress
                                                                       13                for—
                                                                       14                                  (A) the construction of a water resources de-
                                                                       15                         velopment project;
                                                                       16                                  (B) the structural or operational modifica-
                                                                       17                         tion of an existing water resources development
                                                                       18                         project;
                                                                       19                                  (C) such additional monitoring of, or
                                                                       20                         adaptive management measures to carry out
                                                                       21                         with respect to, existing water resources develop-
                                                                       22                         ment projects, to respond to changing hydrologic
                                                                       23                         and climatic conditions; or




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00102   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               103
                                                                          1                                 (D) geographic areas within the Great
                                                                          2                        Lakes System for additional study by the Sec-
                                                                          3                        retary.
                                                                          4                        (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                          5               bility study carried out pursuant to a recommenda-
                                                                          6               tion under paragraph (1)(D) shall be considered to be
                                                                          7               a continuation of the comprehensive assessment de-
                                                                          8               scribed in subsection (a).
                                                                          9               (c) EXEMPTION FROM MAXIMUM STUDY COST AND
                                                                       10 DURATION LIMITATIONS.—Section 1001 of the Water Re-
                                                                       11 sources Reform and Development Act of 2014 (33 U.S.C.
                                                                       12 2282c) shall not apply to any study recommended under
                                                                       13 subsection (b)(1)(D).
                                                                       14          SEC. 208. RATHBUN LAKE, CHARITON RIVER, IOWA.

                                                                       15                 Not later than 1 year after the date of enactment of
                                                                       16 this Act, the Secretary shall submit to the Committee on
                                                                       17 Transportation and Infrastructure of the House of Rep-
                                                                       18 resentatives and the Committee on Environment and Public
                                                                       19 Works of the Senate a report that evaluates—
                                                                       20                          (1) the existing allocations of storage space for
                                                                       21                 Rathbun Lake, authorized pursuant to the Flood Con-
                                                                       22                 trol Act of 1954 (68 Stat. 1262; 121 Stat. 1124), in-
                                                                       23                 cluding the existing allocation for municipal water
                                                                       24                 supply;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00103   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              104
                                                                          1                       (2) the feasibility of expanding the existing allo-
                                                                          2              cation of storage for municipal water supply; and
                                                                          3                       (3) the affordability of future municipal water
                                                                          4              supply allocations from Rathbun Lake, for residential
                                                                          5              users of such future allocations, at projected future
                                                                          6              costs.
                                                                          7        SEC. 209. REPORT ON THE STATUS OF RESTORATION IN

                                                                          8                                THE LOUISIANA COASTAL AREA.

                                                                          9              Not later than 1 year after the date of enactment of
                                                                       10 this Act, the Coastal Louisiana Ecosystem Protection and
                                                                       11 Restoration Task Force established by section 7004 of Water
                                                                       12 Resources Development Act of 2007 (121 Stat. 1272) shall
                                                                       13 submit to Congress a report that summarizes the activities
                                                                       14 and recommendations of the task force, including—
                                                                       15                         (1) policies, strategies, plans, programs, projects,
                                                                       16                and activities undertaken for addressing conservation,
                                                                       17                protection, restoration, and maintenance of the coast-
                                                                       18                al Louisiana ecosystem; and
                                                                       19                         (2) financial participation by each agency rep-
                                                                       20                resented on the Task Force in conserving, protecting,
                                                                       21                restoring, and maintaining the coastal Louisiana eco-
                                                                       22                system.
                                                                       23          SEC. 210. LOWER MISSISSIPPI RIVER COMPREHENSIVE

                                                                       24



kjohnson on DSK79L0C42PROD with BILLS
                                                                                                           STUDY.

                                                                       25                (a) COMPREHENSIVE STUDY.—


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00104   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              105
                                                                          1                       (1) IN GENERAL.—The Secretary shall conduct a
                                                                          2              comprehensive study of the Lower Mississippi River
                                                                          3              basin, from Cape Girardeau, Missouri, to the Gulf of
                                                                          4              Mexico, to identify actions to be undertaken by the
                                                                          5              Secretary for the comprehensive management of the
                                                                          6              basin for the purposes of flood risk management,
                                                                          7              navigation, ecosystem restoration, water supply, hy-
                                                                          8              dropower, and recreation.
                                                                          9                       (2) FOCUS               AREAS.—In                conducting the com-
                                                                       10                prehensive study under paragraph (1), the Secretary
                                                                       11                shall investigate projects, including—
                                                                       12                                  (A) projects proposed in the comprehensive
                                                                       13                         coastal protection master plan entitled ‘‘Lou-
                                                                       14                         isiana Comprehensive Master Plan for a Sus-
                                                                       15                         tainable Coast’’ prepared by the State of Lou-
                                                                       16                         isiana and accepted by the Louisiana Coastal
                                                                       17                         Protection and Restoration Authority (including
                                                                       18                         any subsequent amendments or revisions), in-
                                                                       19                         cluding—
                                                                       20                                          (i) Ama sediment diversion;
                                                                       21                                          (ii) Union freshwater diversion;
                                                                       22                                          (iii) increase Atchafalaya flow to
                                                                       23                                  Terrebonne; and
                                                                       24                                          (iv) Manchac Landbridge diversion;



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00105   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              106
                                                                          1                                (B) natural features and nature-based fea-
                                                                          2                       tures, including levee setbacks and instream and
                                                                          3                       floodplain restoration.
                                                                          4              (b) CONSULTATION AND USE OF EXISTING DATA.—In
                                                                          5 conducting the comprehensive study under subsection (a),
                                                                          6 the Secretary shall consult with applicable Federal, State,
                                                                          7 and local agencies, Indian Tribes, non-Federal interests,
                                                                          8 and other stakeholders, and, to the maximum extent prac-
                                                                          9 ticable and where appropriate, make use of existing data
                                                                       10 provided to the Secretary by such parties.
                                                                       11                (c) RECOMMENDATIONS.—
                                                                       12                         (1) IN GENERAL.—In conducting the comprehen-
                                                                       13                sive study under subsection (a), the Secretary may de-
                                                                       14                velop a recommendation to Congress for—
                                                                       15                                  (A) the construction of a water resources de-
                                                                       16                         velopment project;
                                                                       17                                  (B) the structural or operational modifica-
                                                                       18                         tion of an existing water resources development
                                                                       19                         project;
                                                                       20                                  (C) such additional monitoring of, or
                                                                       21                         adaptive management measures to carry out
                                                                       22                         with respect to, existing water resources develop-
                                                                       23                         ment projects, to respond to changing conditions;
                                                                       24                         or



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00106   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              107
                                                                          1                                 (D) geographic areas within the Lower Mis-
                                                                          2                       sissippi River basin for additional study by the
                                                                          3                       Secretary.
                                                                          4                       (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                          5              bility study carried out pursuant to a recommenda-
                                                                          6              tion under this subsection shall be considered to be a
                                                                          7              continuation of the comprehensive study required
                                                                          8              under subsection (a).
                                                                          9              (d) COMPLETION OF STUDY; REPORT TO CONGRESS.—
                                                                       10 Not later than 3 years after the date of enactment of this
                                                                       11 section, the Secretary shall submit to the Committee on
                                                                       12 Transportation and Infrastructure of the House of Rep-
                                                                       13 resentatives and the Committee on Environment and Public
                                                                       14 Works of the Senate a report detailing—
                                                                       15                         (1) the results of the comprehensive study re-
                                                                       16                quired by this section, including any recommenda-
                                                                       17                tions developed under subsection (c); and
                                                                       18                         (2) any interim actions relating to existing
                                                                       19                water resources development projects undertaken by
                                                                       20                the Secretary during the study period.
                                                                       21          SEC. 211. UPPER MISSISSIPPI RIVER COMPREHENSIVE

                                                                       22                                  PLAN.

                                                                       23                (a) ASSESSMENT.—The Secretary shall conduct an as-
                                                                       24 sessment of the water resources needs of the Upper Mis-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00107   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               108
                                                                          1 sissippi River under section 729 of the Water Resources De-
                                                                          2 velopment Act of 1986 (33 U.S.C. 2267a).
                                                                          3               (b) REQUIREMENTS.—The Secretary shall carry out
                                                                          4 the assessment under subsection (a) in accordance with the
                                                                          5 requirements in section 1206(b) of Water Resources Devel-
                                                                          6 opment Act of 2016 (130 Stat. 1686).
                                                                          7        SEC. 212. LOWER MISSOURI BASIN FLOOD RISK AND RESIL-

                                                                          8                                 IENCY       STUDY,          IOWA,        KANSAS,           NEBRASKA,

                                                                          9                                 AND MISSOURI.

                                                                       10                 (a) ADDITIONAL STUDIES.—
                                                                       11                          (1) IN GENERAL.—Except as provided in para-
                                                                       12                 graph (2), upon the request of the non-Federal inter-
                                                                       13                 est for the Lower Missouri Basin study, the Secretary
                                                                       14                 shall expand the scope of such study to investigate
                                                                       15                 and provide recommendations relating to—
                                                                       16                                    (A) modifications to projects in Iowa, Kan-
                                                                       17                          sas, Nebraska, and Missouri authorized under
                                                                       18                          the Pick-Sloan Missouri River Basin Program
                                                                       19                          (authorized by section 9(b) of the Flood Control
                                                                       20                          Act of December 22, 1944 (chapter 665, 58 Stat.
                                                                       21                          891)) and the Missouri River Bank Stabilization
                                                                       22                          and Navigation project (authorized by section 2
                                                                       23                          of the Act of March 2, 1945 (chapter 19, 59 Stat.
                                                                       24                          19)), including modifications to the authorized



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00108   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              109
                                                                          1                       purposes of such projects to further flood risk
                                                                          2                       management and resiliency; and
                                                                          3                                (B) modifications to non-Federal, publicly
                                                                          4                       owned levees in the Lower Missouri River Basin.
                                                                          5                       (2) EXCEPTION.—If the Secretary determines
                                                                          6              that expanding the scope of the Lower Missouri Basin
                                                                          7              study as provided in paragraph (1) is not prac-
                                                                          8              ticable, and the non-Federal interest for such study
                                                                          9              concurs in such determination, the Secretary shall
                                                                       10                carry out such additional studies as are necessary to
                                                                       11                investigate the modifications described in paragraph
                                                                       12                (1).
                                                                       13                         (3) CONTINUATION OF LOWER MISSOURI BASIN
                                                                       14                STUDY.—The following studies shall be considered a

                                                                       15                continuation of the Lower Missouri Basin study:
                                                                       16                                  (A) Any additional study carried out under
                                                                       17                         paragraph (2).
                                                                       18                                  (B) Any study recommended to be carried
                                                                       19                         out in a report that the Chief of Engineers pre-
                                                                       20                         pares for the Lower Missouri Basin study.
                                                                       21                                  (C) Any study recommended to be carried
                                                                       22                         out in a report that the Chief of Engineers pre-
                                                                       23                         pares for an additional study carried out under
                                                                       24                         paragraph (2).



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00109   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              110
                                                                          1                                (D) Any study spun off from the Lower
                                                                          2                       Missouri Basin study before the completion of
                                                                          3                       such study.
                                                                          4                                (E) Any study spun off from an additional
                                                                          5                       study carried out under paragraph (2) before the
                                                                          6                       completion of such additional study.
                                                                          7                       (4) RELIANCE ON EXISTING INFORMATION.—In
                                                                          8              carrying out any study described in or authorized by
                                                                          9              this section, the Secretary, to the extent practicable,
                                                                       10                shall rely on existing data and analysis, including
                                                                       11                data and analysis prepared under section 22 of the
                                                                       12                Water Resources Development Act of 1974 (42 U.S.C.
                                                                       13                1962d–16).
                                                                       14                         (5) CONSIDERATION; CONSULTATION.—In devel-
                                                                       15                oping recommendations under paragraph (1), the Sec-
                                                                       16                retary shall—
                                                                       17                                  (A) consider the use of—
                                                                       18                                          (i) structural and nonstructural meas-
                                                                       19                                  ures, including the setting back of levees and
                                                                       20                                  removing structures from areas of recurring
                                                                       21                                  flood vulnerability, where advantageous, to
                                                                       22                                  reduce flood risk and damages in the Lower
                                                                       23                                  Missouri River Basin; and
                                                                       24                                          (ii) where such features are locally ac-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  ceptable, natural features or nature-based


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00110   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              111
                                                                          1                                features (as such terms are defined in sec-
                                                                          2                                tion 1184 of the Water Resources Develop-
                                                                          3                                ment Act of 2016 (33 U.S.C. 2289a); and
                                                                          4                                (B) consult with applicable Federal and
                                                                          5                       State agencies, Indian Tribes, and other stake-
                                                                          6                       holders within the Lower Missouri River Basin
                                                                          7                       and solicit public comment on such recommenda-
                                                                          8                       tions.
                                                                          9                       (6) EXEMPTION FROM MAXIMUM STUDY COST
                                                                       10                AND DURATION LIMITATIONS.—Section                                          1001 of the
                                                                       11                Water Resources Reform and Development Act of
                                                                       12                2014 (33 U.S.C. 2282c) shall not apply to the Lower
                                                                       13                Missouri Basin study or any study described in para-
                                                                       14                graph (3).
                                                                       15                         (7) PRECONSTRUCTION, ENGINEERING, AND DE-
                                                                       16                SIGN.—Upon completion of a study authorized by this

                                                                       17                section, if the Secretary determines that a rec-
                                                                       18                ommended project, or modification to a project de-
                                                                       19                scribed in paragraph (1), is justified, the Secretary
                                                                       20                may proceed directly to preconstruction planning, en-
                                                                       21                gineering, and design of the project or modification.
                                                                       22                         (8) TECHNICAL ASSISTANCE.—
                                                                       23                                  (A) IN          GENERAL.—For                    the provision of
                                                                       24                         technical assistance to support small commu-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         nities and economically disadvantaged commu-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00111   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              112
                                                                          1                       nities in the planning and design of flood risk
                                                                          2                       management and flood risk resiliency projects in
                                                                          3                       the Lower Missouri River Basin, for each of fis-
                                                                          4                       cal years 2021 through 2026, there are author-
                                                                          5                       ized to be appropriated—
                                                                          6                                        (i) $2,000,000 to carry out section 206
                                                                          7                                of the Flood Control Act of 1960 (33 U.S.C.
                                                                          8                                709a), in addition to amounts otherwise au-
                                                                          9                                thorized to carry out such section; and
                                                                       10                                          (ii) $2,000,000 to carry out section
                                                                       11                                  22(a)(2) of the Water Resources Develop-
                                                                       12                                  ment Act of 1974 (42 U.S.C. 1962d–16), in
                                                                       13                                  addition to amounts otherwise authorized to
                                                                       14                                  carry out such section.
                                                                       15                                  (B) CONDITIONS.—
                                                                       16                                          (i) LIMITATIONS NOT APPLICABLE.—
                                                                       17                                  The limitations on the use of funds in sec-
                                                                       18                                  tion 206(d) of the Flood Control Act of 1960
                                                                       19                                  and section 22(c)(2) of the Water Resources
                                                                       20                                  Development Act of 1974 shall not apply to
                                                                       21                                  the amounts authorized to be appropriated
                                                                       22                                  by subparagraph (A).
                                                                       23                                          (ii) RULE OF CONSTRUCTION.—Noth-
                                                                       24                                  ing in this paragraph restricts the author-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  ity of the Secretary to use any funds other-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00112   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              113
                                                                          1                                wise appropriated to carry out section 206
                                                                          2                                of the Flood Control Act of 1960 or section
                                                                          3                                22(a)(2) of the Water Resources Develop-
                                                                          4                                ment Act of 1974 to provide technical as-
                                                                          5                                sistance described in subparagraph (A).
                                                                          6                       (9) COMPLETION OF STUDY; REPORT TO CON-
                                                                          7              GRESS.—Not later than 3 years after the date of en-

                                                                          8              actment of this Act, the Secretary shall submit to the
                                                                          9              Committee on Transportation and Infrastructure of
                                                                       10                the House of Representatives and the Committee on
                                                                       11                Environment and Public Works of the Senate a report
                                                                       12                detailing—
                                                                       13                                  (A) the results of the study authorized by
                                                                       14                         this section;
                                                                       15                                  (B) any additional, site-specific areas with-
                                                                       16                         in the Lower Missouri River Basin for which ad-
                                                                       17                         ditional study for flood risk management projects
                                                                       18                         is recommended by the Secretary; and
                                                                       19                                  (C) any interim actions relating to existing
                                                                       20                         water resources development projects undertaken
                                                                       21                         by the Secretary during the study period.
                                                                       22                (b) DEFINITIONS.—In this section:
                                                                       23                         (1) LOWER MISSOURI BASIN STUDY.—The term
                                                                       24                ‘‘Lower Missouri Basin study’’ means the Lower Mis-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                souri Basin Flood Risk and Resiliency Study, Iowa,


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00113   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               114
                                                                          1               Kansas, Nebraska, and Missouri, authorized pursuant
                                                                          2               to section 216 of the Flood Control Act of 1970 (33
                                                                          3               U.S.C. 549a).
                                                                          4                        (2) SMALL COMMUNITY.—The term ‘‘small com-
                                                                          5               munity’’ means a local government that serves a pop-
                                                                          6               ulation of less than 15,000.
                                                                          7        SEC. 213. PORTSMOUTH HARBOR AND PISCATAQUA RIVER

                                                                          8                                 AND RYE HARBOR, NEW HAMPSHIRE.

                                                                          9               Not later than 180 days after the date of enactment
                                                                       10 of this Act, the Secretary shall submit to Congress a written
                                                                       11 status update regarding—
                                                                       12                          (1) efforts to address the impacts of shoaling af-
                                                                       13                 fecting the project for navigation, Rye Harbor, New
                                                                       14                 Hampshire, authorized by section 101 of the River
                                                                       15                 and Harbor Act of 1960 (74 Stat. 480); and
                                                                       16                          (2) the project for navigation, Portsmouth Har-
                                                                       17                 bor and Piscataqua River, authorized by section 101
                                                                       18                 of the River and Harbor Act of 1962 (76 Stat. 1173),
                                                                       19                 as required to be expedited under section 1317 of the
                                                                       20                 Water Resources Development Act of 2018 (Public
                                                                       21                 Law 115–270).
                                                                       22          SEC. 214. COUGAR AND DETROIT DAMS, WILLAMETTE RIVER

                                                                       23                                   BASIN, OREGON.

                                                                       24                 (a) REPORT.—Not later than 2 years after the date



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 of enactment of this Act, the Secretary shall submit to the


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00114   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              115
                                                                          1 Committee on Transportation and Infrastructure of the
                                                                          2 House of Representatives and the Committee on Environ-
                                                                          3 ment and Public Works of the Senate, and make publicly
                                                                          4 available, a report providing an initial analysis of
                                                                          5 deauthorizing hydropower as a project purpose at the Cou-
                                                                          6 gar and Detroit Dams project.
                                                                          7              (b) CONTENTS.—The Secretary shall include in the re-
                                                                          8 port submitted under subsection (a)—
                                                                          9                       (1) a description of the potential effects of
                                                                       10                deauthorizing hydropower as a project purpose at the
                                                                       11                Cougar and Detroit Dams project on—
                                                                       12                                  (A) the operation of the project, including
                                                                       13                         with respect to the other authorized purposes of
                                                                       14                         the project;
                                                                       15                                  (B) compliance of the project with the En-
                                                                       16                         dangered Species Act;
                                                                       17                                  (C) costs that would be attributed to other
                                                                       18                         authorized purposes of the project, including
                                                                       19                         costs relating to compliance with such Act; and
                                                                       20                                  (D) other ongoing studies in the Willamette
                                                                       21                         River Basin; and
                                                                       22                         (2) identification of any further research needed.
                                                                       23                (c) PROJECT DEFINED.—In this section, the terms
                                                                       24 ‘‘Cougar and Detroit Dams project’’ and ‘‘project’’ mean



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 the Cougar Dam and Reservoir project and Detroit Dam


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00115   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               116
                                                                          1 and Reservoir project, Willamette River Basin, Oregon, au-
                                                                          2 thorized by section 204 of the Flood Control Act of 1950
                                                                          3 (64 Stat. 179).
                                                                          4        SEC. 215. PORT ORFORD, OREGON.

                                                                          5               Not later than 180 days after the date of enactment
                                                                          6 of this Act, the Secretary shall, at Federal expense, submit
                                                                          7 to the Committee on Transportation and Infrastructure of
                                                                          8 the House of Representatives and the Committee on Envi-
                                                                          9 ronment and Public Works of the Senate a summary report
                                                                       10 on the research completed and data gathered by the date
                                                                       11 of enactment of this Act with regards to the configuration
                                                                       12 of a breakwater for the project for navigation, Port Orford,
                                                                       13 Oregon, authorized by section 117 of the River and Harbor
                                                                       14 Act of 1970 (84 Stat. 1822; 106 Stat. 4809), for the pur-
                                                                       15 poses of addressing shoaling issues to minimize long-term
                                                                       16 maintenance costs.
                                                                       17          SEC. 216. WILSON CREEK AND SLOAN CREEK, FAIRVIEW,

                                                                       18                                   TEXAS.

                                                                       19                 Not later than 180 days after the date of enactment
                                                                       20 of this section, the Secretary shall submit to Congress a
                                                                       21 written status update regarding efforts to address flooding
                                                                       22 along Wilson Creek and Sloan Creek in the City of Fair-
                                                                       23 view, Texas.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00116   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              117
                                                                          1        SEC. 217. GAO STUDY ON MITIGATION FOR WATER RE-

                                                                          2                                SOURCES DEVELOPMENT PROJECTS.

                                                                          3              Not later than 18 months after the date of enactment
                                                                          4 of this Act, the Comptroller General of the United States
                                                                          5 shall—
                                                                          6                       (1) conduct a study on the mitigation of the im-
                                                                          7              pact of water resources development projects, includ-
                                                                          8              ing the impact on fish and wildlife, consistent with
                                                                          9              the requirements of section 906 of the Water Resources
                                                                       10                Development Act of 1986 (33 U.S.C. 2283), section
                                                                       11                307(a) of the Water Resources Development Act of
                                                                       12                1990 (33 U.S.C. 2317(a)), and section 2036(b) of the
                                                                       13                Water Resources Development Act of 2007 (33 U.S.C.
                                                                       14                2283a), including—
                                                                       15                                   (A) an evaluation of guidance or instruc-
                                                                       16                         tions issued, and other measures taken, by the
                                                                       17                         Secretary to ensure successful mitigation of such
                                                                       18                         impacts;
                                                                       19                                   (B) a review of the methods of mitigation,
                                                                       20                         including the use of in-lieu fees, mitigation
                                                                       21                         banking, and permittee-responsible mitigation,
                                                                       22                         and their long-term effectiveness of restoring or
                                                                       23                         mitigating ecosystem services impacted by such
                                                                       24                         projects;




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00117   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              118
                                                                          1                                (C) a review of how the use of the different
                                                                          2                       mitigation methods for such projects varies
                                                                          3                       across Corps of Engineers districts;
                                                                          4                                (D) an assessment of the backlog of mitiga-
                                                                          5                       tion projects, including the number of mitigation
                                                                          6                       projects pending completion to address such im-
                                                                          7                       pacts resulting from constructed water resources
                                                                          8                       development projects;
                                                                          9                                (E) an evaluation of how the Secretary
                                                                       10                         tracks compliance with the mitigation require-
                                                                       11                         ments across Corps of Engineers districts;
                                                                       12                                  (F) a review of how the mitigation require-
                                                                       13                         ments for water resources development projects
                                                                       14                         contributes to the resilience of water resources in
                                                                       15                         the United States;
                                                                       16                                  (G) an assessment of whether mitigation is
                                                                       17                         being done prior to or contemporaneously with
                                                                       18                         the construction of projects, as required by sec-
                                                                       19                         tion 906 of the Water Resources Development Act
                                                                       20                         of 1986 (33 U.S.C. 2283);
                                                                       21                                  (H) an evaluation of compliance with sec-
                                                                       22                         tion 906(d) of the Water Resources Development
                                                                       23                         Act of 1986 (33 U.S.C. 2283(d)) for the develop-
                                                                       24                         ment of specific mitigation plans for projects,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         whether such plans were successful in mitigating


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00118   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               119
                                                                          1                        the designated impacts of the projects, and, in
                                                                          2                        instances where such plans were not successful,
                                                                          3                        what actions the Secretary is taking to modify
                                                                          4                        the plans such that they will be successful; and
                                                                          5                                  (I) an assessment of how the Secretary
                                                                          6                        might take advantage of natural infrastructure
                                                                          7                        in mitigation planning to reduce flood risks and
                                                                          8                        flood recovery costs for some communities; and
                                                                          9                        (2) submit to Congress a report that—
                                                                       10                                    (A) describes the results of the study con-
                                                                       11                          ducted under paragraph (1);
                                                                       12                                    (B) includes recommendations to ensure
                                                                       13                          compliance with and successful implementation
                                                                       14                          of mitigation requirements for water resources
                                                                       15                          development projects; and
                                                                       16                                    (C) includes recommendations to ensure ex-
                                                                       17                          isting programs and authorities include the use,
                                                                       18                          to the maximum extent practicable, of natural
                                                                       19                          infrastructure.
                                                                       20          SEC. 218. GAO STUDY ON APPLICATION OF HARBOR MAIN-

                                                                       21                                   TENANCE TRUST FUND EXPENDITURES.

                                                                       22                 (a) STUDY.—Not later than 18 months after the date
                                                                       23 of enactment of this Act, the Comptroller General of the
                                                                       24 United States shall conduct a study of the operation and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00119   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              120
                                                                          1 maintenance needs of federally authorized harbor and in-
                                                                          2 land harbor projects, including—
                                                                          3                       (1) an inventory of all federally authorized har-
                                                                          4              bor and inland harbor projects;
                                                                          5                       (2) an assessment of current uses of such projects
                                                                          6              (and, to the extent practicable, the national, regional,
                                                                          7              and local benefits of such uses), including the uses
                                                                          8              listed in section 210(d)(2)(B) of the Water Resources
                                                                          9              Development Act of 1986;
                                                                       10                         (3) an assessment of the annual operation and
                                                                       11                maintenance needs associated with harbors and in-
                                                                       12                land harbors referred to in subsection (a)(2) of section
                                                                       13                210 of the Water Resources Development Act of 1986
                                                                       14                (33 U.S.C. 2238), including a breakdown of such
                                                                       15                needs for each of the following types of projects—
                                                                       16                                  (A) emerging harbor projects (as defined in
                                                                       17                         such section);
                                                                       18                                  (B) moderate-use harbor projects (as defined
                                                                       19                         in such section on the day before the date of en-
                                                                       20                         actment of this Act);
                                                                       21                                  (C) high-use harbor projects (as defined in
                                                                       22                         such section on the day before the date of enact-
                                                                       23                         ment of this Act); and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00120   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              121
                                                                          1                                (D) projects assigned to harbors and inland
                                                                          2                       harbors within the Great Lakes Navigation Sys-
                                                                          3                       tem (as defined in such section);
                                                                          4                       (4) an assessment of any deferred operation and
                                                                          5              maintenance needs for such projects;
                                                                          6                       (5) an assessment of the annual funding level
                                                                          7              trends for moderate-use harbor projects (as defined in
                                                                          8              section 210 of the Water Resources Development Act
                                                                          9              of 1986 on the day before the date of enactment of this
                                                                       10                Act) after the date of enactment of the Water Re-
                                                                       11                sources Development Act of 2014 (Public Law 113–
                                                                       12                121), excluding funds awarded to donor ports, me-
                                                                       13                dium-sized donor ports, and energy transfer ports (as
                                                                       14                such terms are defined in section 2106 of the Water
                                                                       15                Resources Reform and Development Act of 2014 (33
                                                                       16                U.S.C. 2201));
                                                                       17                         (6) an assessment of projected needs associated
                                                                       18                with donor ports, medium-sized donor ports, and en-
                                                                       19                ergy transfer ports (as such terms are defined in sec-
                                                                       20                tion 2106 of the Water Resources Reform and Devel-
                                                                       21                opment Act of 2014 (33 U.S.C. 2201)); and
                                                                       22                         (7) an itemization of expenditures provided to
                                                                       23                donor ports, medium-sized donor ports, and energy
                                                                       24                transfer ports under section 2106 of the Water Re-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00121   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              122
                                                                          1              sources Reform and Development Act of 2014 (33
                                                                          2              U.S.C. 2201).
                                                                          3              (b) REPORT TO CONGRESS.—Upon completion of the
                                                                          4 report under subsection (a), the Comptroller General shall
                                                                          5 submit such report to the Committee on Transportation and
                                                                          6 Infrastructure of the House of Representatives and the Com-
                                                                          7 mittee on Environment and Public Works of the Senate.
                                                                          8        SEC. 219. GAO STUDY ON ADMINISTRATION OF ENVIRON-

                                                                          9                                MENTAL BANKS.

                                                                       10                (a) IN GENERAL.—Not later than one year after the
                                                                       11 date of enactment of this Act, the Comptroller General of
                                                                       12 the United States shall conduct a study and submit to the
                                                                       13 appropriate committees of Congress a report that analyzes
                                                                       14 the administration of section 309 of the Coastal Wetlands
                                                                       15 Planning, Protection and Restoration Act to establish an
                                                                       16 environmental bank (as defined in such section), such that
                                                                       17 the Secretary—
                                                                       18                         (1) achieves the objectives of the report of the
                                                                       19                Chief of Engineers for ecosystem restoration in the
                                                                       20                Louisiana Coastal Area or the objectives of the com-
                                                                       21                prehensive coastal protection master plan entitled
                                                                       22                ‘‘Louisiana Comprehensive Master Plan for a Sus-
                                                                       23                tainable Coast’’ prepared by the State of Louisiana
                                                                       24                and accepted by the Louisiana Coastal Protection and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00122   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              123
                                                                          1              Restoration Authority (including any subsequent
                                                                          2              amendments or revisions);
                                                                          3                       (2) promotes ridge restoration, barrier island
                                                                          4              restoration, marsh creation, nonstructural risk man-
                                                                          5              agement, or any other projects authorized, funded, or
                                                                          6              undertaken, or proposed to be authorized, funded, or
                                                                          7              undertaken, pursuant to such comprehensive coastal
                                                                          8              protection master plan;
                                                                          9                       (3) allows for proactive investment in projects by
                                                                       10                a public or private entity seeking to generate credits
                                                                       11                to satisfy responsibilities associated with environ-
                                                                       12                mental compliance;
                                                                       13                         (4) allows for leveraging additional State, Par-
                                                                       14                ish, or Federal funds; and
                                                                       15                         (5) recommends methods for awarding addi-
                                                                       16                tional credit for high-priority projects listed in the re-
                                                                       17                port and plan described in paragraph (1).
                                                                       18                (b) CONSULTATION WITH STAKEHOLDERS.—In car-
                                                                       19 rying out subsection (a), the Comptroller General of the
                                                                       20 United States shall consult with the Secretary, the Lou-
                                                                       21 isiana Coastal Wetlands Conservation and Restoration
                                                                       22 Task Force, the Governor of Louisiana (or an appointee),
                                                                       23 and other stakeholders, to the extent practicable.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00123   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              124
                                                                          1        SEC. 220. STUDY ON WATER SUPPLY AND WATER CON-

                                                                          2                                SERVATION AT WATER RESOURCES DEVELOP-

                                                                          3                                MENT PROJECTS.

                                                                          4              (a) IN GENERAL.—Not later than 18 months after the
                                                                          5 date of enactment of this Act, the Secretary shall submit
                                                                          6 to the Committee on Transportation and Infrastructure of
                                                                          7 the House of the Representatives and the Committee on En-
                                                                          8 vironment and Public Works of the Senate a report that
                                                                          9 analyzes the benefits and consequences of including munic-
                                                                       10 ipal water supply and water conservation as a primary
                                                                       11 mission of the Corps of Engineers in carrying out water
                                                                       12 resources development projects.
                                                                       13                (b) INCLUSION.—The Secretary shall include in the re-
                                                                       14 port submitted under subsection (a)—
                                                                       15                         (1) a description of existing water resources de-
                                                                       16                velopment projects with municipal water supply or
                                                                       17                water conservation as authorized purposes, and the
                                                                       18                extent to which such projects are utilized for such
                                                                       19                purposes;
                                                                       20                         (2) a description of existing water resources de-
                                                                       21                velopment projects with respect to which—
                                                                       22                                   (A) municipal water supply or water con-
                                                                       23                         servation could be added as a project purpose,
                                                                       24                         including those with respect to which a non-Fed-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         eral interest has expressed an interest in adding


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00124   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                125
                                                                          1                        municipal water supply or water conservation as
                                                                          2                        a project purpose; and
                                                                          3                                  (B) such a purpose could be accommodated
                                                                          4                        while maintaining existing authorized purposes;
                                                                          5                        (3) a description of ongoing water resources de-
                                                                          6               velopment project studies the authorizations for which
                                                                          7               include authorization for the Secretary to study the
                                                                          8               feasibility of carrying out the project with a purpose
                                                                          9               of municipal water supply or water conservation;
                                                                       10                          (4) an analysis of how adding municipal water
                                                                       11                 supply and water conservation as a primary mission
                                                                       12                 of the Corps of Engineers would affect the ability of
                                                                       13                 the Secretary to carry out future water resources de-
                                                                       14                 velopment projects; and
                                                                       15                          (5) any recommendations of the Secretary relat-
                                                                       16                 ing to including municipal water supply and water
                                                                       17                 conservation as a primary mission of the Corps of
                                                                       18                 Engineers.
                                                                       19          SEC. 221. PFAS REVIEW AND INVENTORY AT CORPS FACILI-

                                                                       20                                   TIES.

                                                                       21                 (a) INVENTORY OF PFAS AT CORPS FACILITIES.—
                                                                       22                          (1) IN GENERAL.—Not later than 18 months
                                                                       23                 after the date of enactment of this section, and annu-
                                                                       24                 ally thereafter the Secretary shall complete an inven-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 tory of Corps of Engineers civil works facilities that


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000    Frm 00125   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              126
                                                                          1              are or may be contaminated, or could become con-
                                                                          2              taminated, by PFAS.
                                                                          3                       (2) CONTENTS OF INVENTORY.—In carrying out
                                                                          4              this subsection, the Secretary shall review and iden-
                                                                          5              tify—
                                                                          6                                (A) all facilities owned or operated by the
                                                                          7                       Corps of Engineers, for which there is a civil
                                                                          8                       works function, that are or may be contami-
                                                                          9                       nated, or could become contaminated, by PFAS;
                                                                       10                                  (B) the nature and extent of any such con-
                                                                       11                         tamination or potential for contamination, in-
                                                                       12                         cluding any potential pathways for human expo-
                                                                       13                         sure to PFAS;
                                                                       14                                  (C) response measures taken to monitor,
                                                                       15                         control, remove, or remediate PFAS, or otherwise
                                                                       16                         reduce the risk of human exposure to PFAS;
                                                                       17                                  (D) for facilities identified under subpara-
                                                                       18                         graph (A), the extent to which such facilities (or
                                                                       19                         any such contamination or potential for con-
                                                                       20                         tamination at such facilities) are related to the
                                                                       21                         civil works functions of the Corps of Engineers;
                                                                       22                                  (E) the extent to which the Secretary, or
                                                                       23                         other entities, may have responsibility for such
                                                                       24                         contamination or potential for contamination;



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00126   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              127
                                                                          1                                (F) for facilities identified under subpara-
                                                                          2                       graph (A), the costs to remediate and reduce the
                                                                          3                       risk of human exposure to PFAS.
                                                                          4                       (3) COORDINATION WITH OTHER FEDERAL AGEN-
                                                                          5              CIES.—To             the maximum extent practicable, the ac-
                                                                          6              tions taken under this subsection shall supplement
                                                                          7              and support work undertaken by other Federal agen-
                                                                          8              cies, including actions taken pursuant to the plan
                                                                          9              published by the Administrator of the Environmental
                                                                       10                Protection              Agency,             titled         ‘‘EPA’s           Per-   and
                                                                       11                Polyfluoroalkyl Substances (PFAS) Action Plan’’ and
                                                                       12                dated February 2019.
                                                                       13                         (4) REPORT TO CONGRESS.—Upon completion of
                                                                       14                the inventory under paragraph (1), and annually
                                                                       15                thereafter concurrent with the President’s annual
                                                                       16                budget request to Congress, the Secretary shall submit
                                                                       17                the inventory to the Committee on Transportation
                                                                       18                and Infrastructure of the House of Representatives
                                                                       19                and the Committee on Environment and Public
                                                                       20                Works of the Senate.
                                                                       21                (b) PFAS TECHNOLOGY RESEARCH.—
                                                                       22                         (1) RESEARCH SUPPORT.—The Secretary, acting
                                                                       23                through the Hazardous Waste Research Center located
                                                                       24                at the Engineer Research and Development Center,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                shall, to the maximum extent practicable, support the


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00127   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               128
                                                                          1               efforts of other Federal agencies in the development of
                                                                          2               innovative technologies and methodologies for the de-
                                                                          3               tection, treatment, and cleanup of PFAS associated
                                                                          4               with Federal facilities, including groundwater associ-
                                                                          5               ated with such facilities.
                                                                          6                        (2) DUPLICATION OF EFFORTS.—Nothing in this
                                                                          7               subsection is intended to duplicate the activities un-
                                                                          8               dertaken by other Federal agencies as identified in
                                                                          9               subsection (a)(3).
                                                                       10                 (c) DEFINITION.—In this section, the term ‘‘PFAS’’
                                                                       11 means a perfluoroalkyl substance or polyfluoroalkyl sub-
                                                                       12 stance with at least one fully fluorinated carbon atom.
                                                                       13          SEC. 222. REPORT ON RECREATIONAL FACILITIES.

                                                                       14                 No later than 18 months after the date of enactment
                                                                       15 of this Act, the Secretary shall submit to the Committee on
                                                                       16 Transportation and Infrastructure of the House of Rep-
                                                                       17 resentatives and the Committee on Environment and Public
                                                                       18 Works of the Senate a report that contains—
                                                                       19                          (1) an inventory of all recreational infrastruc-
                                                                       20                 ture and facilities associated with water resources de-
                                                                       21                 velopment projects;
                                                                       22                          (2) an assessment of the annual operation and
                                                                       23                 maintenance needs associated with such infrastruc-
                                                                       24                 ture and facilities;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00128   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               129
                                                                          1                        (3) an assessment of deferred operation and
                                                                          2               maintenance needs for such infrastructure and facili-
                                                                          3               ties to operate safely at full capacity; and
                                                                          4                        (4) an assessment of the economic benefits of
                                                                          5               recreation to local and regional economies and bene-
                                                                          6               fits of sustaining and improving public access at rec-
                                                                          7               reational infrastructure and facilities.
                                                                          8         TITLE III—DEAUTHORIZATIONS
                                                                          9             AND MODIFICATIONS
                                                                       10          SEC. 301. DEAUTHORIZATION OF INACTIVE PROJECTS.

                                                                       11                 (a) PURPOSES.—The purposes of this section are—
                                                                       12                          (1) to identify water resources development
                                                                       13                 projects authorized by Congress that are no longer
                                                                       14                 viable for construction due to—
                                                                       15                                   (A) a lack of local support;
                                                                       16                                   (B) a lack of available Federal or non-Fed-
                                                                       17                          eral resources; or
                                                                       18                                   (C) an authorizing purpose that is no
                                                                       19                          longer relevant or feasible;
                                                                       20                          (2) to create an expedited and definitive process
                                                                       21                 for Congress to deauthorize water resources develop-
                                                                       22                 ment projects that are no longer viable for construc-
                                                                       23                 tion; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00129   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              130
                                                                          1                       (3) to allow the continued authorization of water
                                                                          2              resources development projects that are viable for con-
                                                                          3              struction.
                                                                          4              (b) PROPOSED DEAUTHORIZATION LIST.—
                                                                          5                       (1) PRELIMINARY LIST OF PROJECTS.—
                                                                          6                                (A) IN GENERAL.—The Secretary shall de-
                                                                          7                       velop a preliminary list of each water resources
                                                                          8                       development project, or separable element of a
                                                                          9                       project, authorized for construction before No-
                                                                       10                         vember 8, 2007, for which—
                                                                       11                                          (i) planning, design, or construction
                                                                       12                                  was not initiated before the date of enact-
                                                                       13                                  ment of this Act; or
                                                                       14                                          (ii) planning, design, or construction
                                                                       15                                  was initiated before the date of enactment of
                                                                       16                                  this Act, but for which no funds, Federal or
                                                                       17                                  non-Federal, were obligated for planning,
                                                                       18                                  design, or construction of the project or sep-
                                                                       19                                  arable element of the project during the cur-
                                                                       20                                  rent fiscal year or any of the 10 preceding
                                                                       21                                  fiscal years.
                                                                       22                                  (B) USE OF COMPREHENSIVE CONSTRUC-
                                                                       23                         TION BACKLOG AND OPERATION AND MAINTE-

                                                                       24                         NANCE REPORT.—The Secretary may develop the




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         preliminary list from the comprehensive con-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00130   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              131
                                                                          1                       struction backlog and operation and mainte-
                                                                          2                       nance reports developed pursuant to section
                                                                          3                       1001(b)(2) of the Water Resources Development
                                                                          4                       Act of 1986 (33 U.S.C. 579a).
                                                                          5                       (2) PREPARATION OF PROPOSED DEAUTHORIZA-
                                                                          6              TION LIST.—

                                                                          7                                (A) DEAUTHORIZATION AMOUNT.—The Sec-
                                                                          8                       retary shall prepare a proposed list of projects
                                                                          9                       for deauthorization comprised of a subset of
                                                                       10                         projects and separable elements identified on the
                                                                       11                         preliminary list developed under paragraph (1)
                                                                       12                         that have, in the aggregate, an estimated Federal
                                                                       13                         cost to complete that is at least $10,000,000,000.
                                                                       14                                  (B) DETERMINATION OF FEDERAL COST TO
                                                                       15                         COMPLETE.—For purposes of subparagraph (A),

                                                                       16                         the Federal cost to complete shall take into ac-
                                                                       17                         count any allowances authorized by section 902
                                                                       18                         of the Water Resources Development Act of 1986
                                                                       19                         (33 U.S.C. 2280), as applied to the most recent
                                                                       20                         project schedule and cost estimate.
                                                                       21                                  (C) INCLUSION OF DEAUTHORIZATION OF
                                                                       22                         ANTIQUATED PROJECTS.—The Secretary shall re-

                                                                       23                         duce the amount identified for deauthorization
                                                                       24                         under paragraph (2)(A) by an amount equiva-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         lent to the estimated current value of each


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00131   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              132
                                                                          1                       project, or separable element of a project, that is
                                                                          2                       deauthorized by subsection (f).
                                                                          3                       (3) SEQUENCING OF PROJECTS.—
                                                                          4                                (A) IN            GENERAL.—The                    Secretary shall
                                                                          5                       identify projects and separable elements for in-
                                                                          6                       clusion on the proposed list of projects for de-
                                                                          7                       authorization under paragraph (2) according to
                                                                          8                       the order in which the projects and separable ele-
                                                                          9                       ments were authorized, beginning with the ear-
                                                                       10                         liest authorized projects and separable elements
                                                                       11                         and ending with the latest project or separable
                                                                       12                         element necessary to meet the aggregate amount
                                                                       13                         under paragraph (2)(A).
                                                                       14                                  (B) FACTORS TO CONSIDER.—The Secretary
                                                                       15                         may identify projects and separable elements in
                                                                       16                         an order other than that established by subpara-
                                                                       17                         graph (A) if the Secretary determines, on a case-
                                                                       18                         by-case basis, that a project or separable element
                                                                       19                         is critical for interests of the United States,
                                                                       20                         based on the possible impact of the project or
                                                                       21                         separable element on public health and safety,
                                                                       22                         the national economy, or the environment.
                                                                       23                         (4) PUBLIC COMMENT AND CONSULTATION.—
                                                                       24                                  (A) IN GENERAL.—The Secretary shall so-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         licit comments from the public and the Gov-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00132   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              133
                                                                          1                       ernors of each applicable State on the proposed
                                                                          2                       deauthorization list prepared under paragraph
                                                                          3                       (2)(A).
                                                                          4                                (B) COMMENT PERIOD.—The public com-
                                                                          5                       ment period shall be 90 days.
                                                                          6                       (5) PREPARATION OF FINAL DEAUTHORIZATION
                                                                          7              LIST.—

                                                                          8                                (A) IN GENERAL.—The Secretary shall pre-
                                                                          9                       pare a final deauthorization list by—
                                                                       10                                          (i) considering any comments received
                                                                       11                                  under paragraph (4); and
                                                                       12                                          (ii) revising the proposed deauthoriza-
                                                                       13                                  tion list prepared under paragraph (2)(A)
                                                                       14                                  as the Secretary determines necessary to re-
                                                                       15                                  spond to such comments.
                                                                       16                                  (B) APPENDIX.—The Secretary shall in-
                                                                       17                         clude as part of the final deauthorization list an
                                                                       18                         appendix that—
                                                                       19                                          (i) identifies each project or separable
                                                                       20                                  element on the proposed deauthorization list
                                                                       21                                  that is not included on the final deauthor-
                                                                       22                                  ization list; and
                                                                       23                                          (ii) describes the reasons why the
                                                                       24                                  project or separable element is not included



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  on the final deauthorization list.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00133   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              134
                                                                          1              (c) SUBMISSION OF FINAL DEAUTHORIZATION LIST TO
                                                                          2 CONGRESS FOR CONGRESSIONAL REVIEW; PUBLICATION.—
                                                                          3                       (1) IN GENERAL.—Not later than 90 days after
                                                                          4              the date of the close of the comment period under sub-
                                                                          5              section (b)(4), the Secretary shall—
                                                                          6                                (A) submit the final deauthorization list
                                                                          7                       and appendix prepared under subsection (b)(5)
                                                                          8                       to the Committee on Transportation and Infra-
                                                                          9                       structure of the House of Representatives and the
                                                                       10                         Committee on Environment and Public Works of
                                                                       11                         the Senate; and
                                                                       12                                  (B) publish the final deauthorization list
                                                                       13                         and appendix in the Federal Register.
                                                                       14                         (2) EXCLUSIONS.—The Secretary shall not in-
                                                                       15                clude in the final deauthorization list submitted
                                                                       16                under paragraph (1) any project or separable element
                                                                       17                with respect to which Federal funds for planning, de-
                                                                       18                sign, or construction are obligated after the develop-
                                                                       19                ment of the preliminary list under subsection
                                                                       20                (b)(1)(A) but prior to the submission of the final de-
                                                                       21                authorization list under paragraph (1)(A) of this sub-
                                                                       22                section.
                                                                       23                (d) DEAUTHORIZATION; CONGRESSIONAL REVIEW.—
                                                                       24                         (1) IN GENERAL.—After the expiration of the 2-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                year period beginning on the date of publication of


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00134   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              135
                                                                          1              the final deauthorization list and appendix under
                                                                          2              subsection (c)(1)(B), a project or separable element of
                                                                          3              a project identified in the final deauthorization list is
                                                                          4              hereby deauthorized, unless Congress passes a joint
                                                                          5              resolution disapproving the final deauthorization list
                                                                          6              prior to the end of such period.
                                                                          7                       (2) NON-FEDERAL CONTRIBUTIONS.—
                                                                          8                                (A) IN GENERAL.—A project or separable
                                                                          9                       element of a project identified in the final de-
                                                                       10                         authorization list under subsection (c) shall not
                                                                       11                         be deauthorized under this subsection if, before
                                                                       12                         the expiration of the 2-year period referred to in
                                                                       13                         paragraph (1), the non-Federal interest for the
                                                                       14                         project or separable element of the project pro-
                                                                       15                         vides sufficient funds to complete the project or
                                                                       16                         separable element of the project.
                                                                       17                                  (B) TREATMENT OF PROJECTS.—Notwith-
                                                                       18                         standing subparagraph (A), each project and
                                                                       19                         separable element of a project identified in the
                                                                       20                         final deauthorization list shall be treated as de-
                                                                       21                         authorized for purposes of the aggregate de-
                                                                       22                         authorization amount specified in subsection
                                                                       23                         (b)(2)(A).
                                                                       24                         (3) PROJECTS                                                    APPENDIX.—A




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                                                  IDENTIFIED             IN

                                                                       25                project or separable element of a project identified in


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00135   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              136
                                                                          1              the appendix to the final deauthorization list shall re-
                                                                          2              main subject to future deauthorization by Congress.
                                                                          3              (e) SPECIAL RULES.—
                                                                          4                       (1) POST-AUTHORIZATION STUDIES.—A project
                                                                          5              or separable element of a project may not be identi-
                                                                          6              fied on the proposed deauthorization list developed
                                                                          7              under subsection (b), or the final deauthorization list
                                                                          8              developed under subsection (c), if the project or sepa-
                                                                          9              rable element received funding for a post-authoriza-
                                                                       10                tion study during the current fiscal year or any of the
                                                                       11                10 preceding fiscal years.
                                                                       12                         (2) TREATMENT OF PROJECT MODIFICATIONS.—
                                                                       13                For purposes of this section, if an authorized water
                                                                       14                resources development project or separable element of
                                                                       15                the project has been modified by an Act of Congress,
                                                                       16                the date of the authorization of the project or sepa-
                                                                       17                rable element shall be deemed to be the date of the
                                                                       18                most recent such modification.
                                                                       19                (f) DEAUTHORIZATION OF ANTIQUATED PROJECTS.—
                                                                       20                         (1) IN GENERAL.—Any water resources develop-
                                                                       21                ment project, or separable element of a project, au-
                                                                       22                thorized for construction prior to November 17, 1986,
                                                                       23                for which construction has not been initiated prior to
                                                                       24                the date of enactment of this Act, or for which funds



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                have not been obligated for construction in the 10-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00136   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              137
                                                                          1              year period prior to the date of enactment of this Act,
                                                                          2              is hereby deauthorized.
                                                                          3                       (2) IDENTIFICATION.—Not later than 60 days
                                                                          4              after the date of enactment of this Act, the Secretary
                                                                          5              shall issue to the Committee on Transportation and
                                                                          6              Infrastructure of the House of Representatives and the
                                                                          7              Committee on Environment and Public Works of the
                                                                          8              Senate a report that identifies—
                                                                          9                                (A) the name of each project, or separable
                                                                       10                         element of a project, deauthorized by paragraph
                                                                       11                         (1); and
                                                                       12                                  (B) the estimated current value of each such
                                                                       13                         project or separable element of a project.
                                                                       14                (g) ECONOMIC AND ENVIRONMENTAL REVIEW OF INAC-
                                                                       15          TIVE WATER RESOURCES DEVELOPMENT PROJECTS.—The

                                                                       16 Secretary or the non-Federal interest may not carry out
                                                                       17 any authorized water resources development project, or sep-
                                                                       18 arable element of such project, for which construction has
                                                                       19 not been initiated in the 20-year period following the date
                                                                       20 of the authorization of such project or separable element,
                                                                       21 until—
                                                                       22                         (1) the Secretary provides to the Committee on
                                                                       23                Transportation and Infrastructure of the House of
                                                                       24                Representatives and the Committee on Environment



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                and Public Works of the Senate a post-authorization


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00137   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              138
                                                                          1              change report that updates the economic and environ-
                                                                          2              mental analysis of the project or separable element;
                                                                          3              and
                                                                          4                       (2) the Committee on Transportation and Infra-
                                                                          5              structure of the House of Representatives and the
                                                                          6              Committee on Environment and Public Works of the
                                                                          7              Senate take appropriate action to address any modi-
                                                                          8              fications to the economic and environmental analysis
                                                                          9              for the project or separable element of the project con-
                                                                       10                tained in the post-authorization change report.
                                                                       11                (h) DEFINITIONS.—In this section:
                                                                       12                         (1) POST-AUTHORIZATION                             CHANGE REPORT.—

                                                                       13                The term ‘‘post-authorization change report’’ has the
                                                                       14                meaning given such term in section 1132(d) of the
                                                                       15                Water Resources Development Act of 2016 (33 U.S.C.
                                                                       16                2282e).
                                                                       17                         (2) POST-AUTHORIZATION                               STUDY.—The         term
                                                                       18                ‘‘post-authorization study’’ means—
                                                                       19                                  (A) a feasibility report developed under sec-
                                                                       20                         tion 905 of the Water Resources Development Act
                                                                       21                         of 1986 (33 U.S.C. 2282);
                                                                       22                                  (B) a feasibility study, as defined in section
                                                                       23                         105(d) of the Water Resources Development Act
                                                                       24                         of 1986 (33 U.S.C. 2215(d)); or



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00138   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               139
                                                                          1                                  (C) a review conducted under section 216 of
                                                                          2                        the Flood Control Act of 1970 (33 U.S.C. 549a),
                                                                          3                        including an initial appraisal that—
                                                                          4                                         (i) demonstrates a Federal interest;
                                                                          5                                  and
                                                                          6                                         (ii) requires additional analysis for the
                                                                          7                                  project or separable element.
                                                                          8                        (3)          WATER                RESOURCES                     DEVELOPMENT

                                                                          9               PROJECT.—The                   term ‘‘water resources development
                                                                       10                 project’’ includes an environmental infrastructure as-
                                                                       11                 sistance project or program of the Corps of Engineers.
                                                                       12          SEC. 302. ABANDONED AND INACTIVE NONCOAL MINE RES-

                                                                       13                                   TORATION.

                                                                       14                 Section 560(f) of the Water Resources Development Act
                                                                       15 of 1999 (33 U.S.C. 2336(f)) is amended by striking
                                                                       16 ‘‘$20,000,000’’ and inserting ‘‘$30,000,000’’.
                                                                       17          SEC. 303. TRIBAL PARTNERSHIP PROGRAM.

                                                                       18                 Section 203(b)(4) of the Water Resources Development
                                                                       19 Act of 2000 (33 U.S.C. 2269) is amended by striking
                                                                       20 ‘‘$12,500,000’’ each place it appears and inserting
                                                                       21 ‘‘$15,000,000’’.
                                                                       22          SEC. 304. LAKES PROGRAM.

                                                                       23                 Section 602(a) of the Water Resources Development
                                                                       24 Act of 1986 (Public Law 99–662, 100 Stat. 4148; 110 Stat.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 3758; 113 Stat. 295; 121 Stat. 1076) is amended—


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00139   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               140
                                                                          1                        (1) in paragraph (27), by striking ‘‘and’’ at the
                                                                          2               end;
                                                                          3                        (2) in paragraph (28), by striking the period at
                                                                          4               the end and inserting a semicolon; and
                                                                          5                        (3) by adding at the end the following:
                                                                          6                        ‘‘(29) Ellis Pond and Guild Pond, Norwood,
                                                                          7               Massachusetts; and
                                                                          8                        ‘‘(30) Memorial Pond, Walpole, Massachusetts.’’.
                                                                          9        SEC. 305. WATERCRAFT INSPECTION STATIONS.

                                                                       10                 Section 104(d)(1)(A) of the River and Harbor Act of
                                                                       11 1958 (33 U.S.C. 610(d)(1)(A)) is amended—
                                                                       12                          (1) in clause (ii), by striking ‘‘; and’’ and insert-
                                                                       13                 ing a semicolon;
                                                                       14                          (2) in clause (iii), by striking ‘‘Arizona River
                                                                       15                 Basins.’’ and inserting ‘‘Arkansas River Basins;
                                                                       16                 and’’; and
                                                                       17                          (3) by adding at the end the following:
                                                                       18                                           ‘‘(iv) to protect the Russian River
                                                                       19                                    Basin, California.’’.
                                                                       20          SEC. 306. CHESAPEAKE BAY ENVIRONMENTAL RESTORA-

                                                                       21                                   TION AND PROTECTION PROGRAM.

                                                                       22                 (a) IN GENERAL.—Section 510 of the Water Resources
                                                                       23 Development Act of 1996 (Public Law 104–303, 110 Stat.
                                                                       24 3759; 121 Stat. 1202; 128 Stat. 1317) is amended—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00140   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               141
                                                                          1                        (1) by redesignating subsection (h) as subsection
                                                                          2               (i) and inserting after subsection (g) the following:
                                                                          3               ‘‘(h) PROJECT CAP.—The total cost of a project carried
                                                                          4 out under this section may not exceed $15,000,000.’’; and
                                                                          5                        (2) in subsection (i) (as so redesignated), by
                                                                          6               striking ‘‘$40,000,000’’ and inserting ‘‘$60,000,000’’.
                                                                          7               (b) OUTREACH AND TRAINING.—The Secretary shall
                                                                          8 conduct public outreach and workshops for non-Federal in-
                                                                          9 terests to provide information on the Chesapeake Bay envi-
                                                                       10 ronmental restoration and protection program established
                                                                       11 under section 510 of the Water Resources Development Act
                                                                       12 of 1996, including how to participate in the program.
                                                                       13          SEC. 307. UPPER MISSISSIPPI RIVER SYSTEM ENVIRON-

                                                                       14                                   MENTAL MANAGEMENT PROGRAM.

                                                                       15                 Section 1103(e)(3) of the Water Resources Development
                                                                       16 Act of 1986 (33 U.S.C. 652(e)(3)) is amended by striking
                                                                       17 ‘‘$22,750,000’’ and inserting ‘‘$40,000,000’’.
                                                                       18          SEC. 308. MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION

                                                                       19                                   SYSTEM.

                                                                       20                 Any Federal funds, regardless of the account from
                                                                       21 which the funds were provided, used to carry out construc-
                                                                       22 tion of the modification to the McClellan-Kerr Arkansas
                                                                       23 River Navigation System, authorized in section 136 of the
                                                                       24 Energy and Water Development Appropriations Act, 2004



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 (117 Stat. 1842), shall be considered by the Secretary as


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00141   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               142
                                                                          1 initiating construction of the project such that future funds
                                                                          2 will not require a new investment decision.
                                                                          3        SEC. 309. OUACHITA-BLACK RIVER NAVIGATION PROJECT,

                                                                          4                                 ARKANSAS.

                                                                          5               The project for navigation, Ouachita-Black River, Ar-
                                                                          6 kansas, authorized by section 101 of the River and Harbor
                                                                          7 Act of 1960 (Public Law 86–645), is modified to include
                                                                          8 water supply as a project purpose, subject to completion
                                                                          9 by the Secretary of a feasibility study and any other review
                                                                       10 necessary for such modification.
                                                                       11          SEC.      310.     SACRAMENTO                   RIVER,         GLENN-COLUSA,            CALI-

                                                                       12                                   FORNIA.

                                                                       13                 The portion of project for flood control, Sacramento
                                                                       14 River, California, authorized by section 2 of the Act of
                                                                       15 March 1, 1917 (chapter 144, 39 Stat. 949; 103 Stat. 649;
                                                                       16 110 Stat. 3709; 112 Stat. 1841; 113 Stat. 299), consisting
                                                                       17 of a riverbed gradient restoration facility at the Glenn-
                                                                       18 Colusa Irrigation District Intake, is no longer authorized
                                                                       19 beginning on the date of enactment of this Act.
                                                                       20          SEC. 311. LAKE ISABELLA, CALIFORNIA.

                                                                       21                 (a) SENSE OF CONGRESS.—It is the sense of Congress
                                                                       22 that the Secretary, when evaluating alternative locations for
                                                                       23 construction of a permanent Isabella Lake Visitor Center
                                                                       24 by the Corps of Engineers to replace the facility impacted



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 by the Isabella Dam safety modification project, should af-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00142   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              143
                                                                          1 ford substantial weight to the site preference of the local
                                                                          2 community.
                                                                          3              (b) AUTHORITY.—The Secretary may acquire such in-
                                                                          4 terests in real property as the Secretary determines nec-
                                                                          5 essary or advisable to support construction of the Isabella
                                                                          6 Dam safety modification project.
                                                                          7              (c) TRANSFER.—The Secretary may transfer any real
                                                                          8 property interests acquired under subsection (b) to any
                                                                          9 other Federal agency or department without reimburse-
                                                                       10 ment.
                                                                       11                (d) ISABELLA DAM SAFETY MODIFICATION PROJECT
                                                                       12 DEFINED.—In this section, the term ‘‘Isabella Dam safety
                                                                       13 modification project’’ means the dam safety modification
                                                                       14 project at the Isabella Reservoir in the San Joaquin Valley,
                                                                       15 California (authorized by Act of December 22, 1944 (chap-
                                                                       16 ter 665, 58 Stat. 901)), including the component of the
                                                                       17 project relating to construction a visitor center facility.
                                                                       18          SEC. 312. LOWER SAN JOAQUIN RIVER FLOOD CONTROL

                                                                       19                                  PROJECT.

                                                                       20                The Secretary shall align the schedules of, and maxi-
                                                                       21 mize complimentary efforts, minimize duplicative practices,
                                                                       22 and ensure coordination and information sharing with re-
                                                                       23 spect to—
                                                                       24                         (1) the project for flood risk management, Lower



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                San Joaquin River, authorized by section 1401(2) of


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00143   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               144
                                                                          1               the Water Resources Development Act of 2018 (132
                                                                          2               Stat. 3836); and
                                                                          3                        (2) the second phase of the feasibility study for
                                                                          4               the Lower San Joaquin River project for flood risk
                                                                          5               management, authorized for expedited completion by
                                                                          6               section 1203(a)(7) of the Water Resources Develop-
                                                                          7               ment Act 2018 (132 Stat. 3803).
                                                                          8        SEC. 313. SAN DIEGO RIVER AND MISSION BAY, SAN DIEGO

                                                                          9                                 COUNTY, CALIFORNIA.

                                                                       10                 The portion of the project for flood control and naviga-
                                                                       11 tion, San Diego River and Mission Bay, San Diego County,
                                                                       12 California, authorized by the Act of July 24, 1946 (chapter
                                                                       13 595, 60 Stat. 636), identified in the National Levee Data-
                                                                       14 base established under section 9004 of the Water Resources
                                                                       15 Development Act of 2007 (33 U.S.C. 3303) as the San Diego
                                                                       16 River 3 segment and consisting of a 785-foot-long segment
                                                                       17 of the right bank levee from Station 209+41.75 to its end
                                                                       18 at Station 217+26.75, as described in construction plans
                                                                       19 dated August 30, 1951, is no longer authorized beginning
                                                                       20 on the date of enactment of this Act.
                                                                       21          SEC. 314. SAN FRANCISCO, CALIFORNIA, WATERFRONT

                                                                       22                                   AREA.

                                                                       23                 (a) IN GENERAL.—Section 114 of the River and Har-
                                                                       24 bor Act of 1968 (33 U.S.C. 59h) is amended to read as fol-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 lows:


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00144   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              145
                                                                          1        ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATERFRONT

                                                                          2                                AREA.

                                                                          3              ‘‘(a) AREA TO BE DECLARED NONNAVIGABLE.—The
                                                                          4 following area is declared to be nonnavigable waters of the
                                                                          5 United States: All of that portion of the City and County
                                                                          6 of San Francisco, California, lying shoreward of a line be-
                                                                          7 ginning at the intersection of the southerly right of way
                                                                          8 line of Earl Street prolongation with the Pierhead United
                                                                          9 States Government Pierhead line, the Pierhead line as de-
                                                                       10 fined in the State of California Harbor and Navigation
                                                                       11 Code Section 1770, as amended in 1961; thence northerly
                                                                       12 along said Pierhead line to its intersection with a line par-
                                                                       13 allel with and distant 10 feet easterly from, the existing
                                                                       14 easterly boundary line of Pier 30–32; thence northerly along
                                                                       15 said parallel line and its northerly prolongation, to a point
                                                                       16 of intersection with a line parallel with, and distant 10
                                                                       17 feet northerly from, the existing northerly boundary of Pier
                                                                       18 30–32; thence westerly along last said parallel line to its
                                                                       19 intersection with said Pierhead line; thence northerly along
                                                                       20 said Pierhead line, to the intersection of the easterly right
                                                                       21 of way line of Van Ness Avenue, formerly Marlette Street,
                                                                       22 prolongation to the Pierhead line.
                                                                       23                ‘‘(b) REQUIREMENT THAT AREA BE IMPROVED.—The
                                                                       24 declaration of nonnavigability under subsection (a) applies




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 only to those parts of the area described in subsection (a)
                                                                       26 that are or will be bulkheaded, filled, or otherwise occupied
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00145   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               146
                                                                          1 or covered by permanent structures and does not affect the
                                                                          2 applicability of any Federal statute or regulation that re-
                                                                          3 lates to filling of navigable waters or to other regulated ac-
                                                                          4 tivities within the area described in subsection (a), includ-
                                                                          5 ing sections 9 and 10 of the Act of March 3, 1899 (33 U.S.C.
                                                                          6 401, 403), section 404 of the Federal Water Pollution Con-
                                                                          7 trol Act, and the National Environmental Policy Act of
                                                                          8 1969.
                                                                          9               ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC DIS-
                                                                       10          TRICT.—Congress finds and declares that the area described

                                                                       11 in subsection (a) contains the seawall, piers, and wharves
                                                                       12 that comprise the Embarcadero Historic District listed on
                                                                       13 the National Register of Historic Places on May 12, 2006.’’.
                                                                       14                 (b) CONFORMING AMENDMENT.—Section 5052 of the
                                                                       15 Water Resources Development Act of 2007 (33 U.S.C. 59h–
                                                                       16 1) is repealed.
                                                                       17          SEC. 315. WESTERN PACIFIC INTERCEPTOR CANAL, SAC-

                                                                       18                                   RAMENTO RIVER, CALIFORNIA.

                                                                       19                 The portion of the project for flood protection on the
                                                                       20 Sacramento River, authorized by section 2 of the of March
                                                                       21 1, 1917 (chapter 144, 39 Stat. 949; 45 Stat. 539; 50 Stat.
                                                                       22 877; 55 Stat. 647; 80 Stat. 1422), consisting of the portion
                                                                       23 of             the        levee       from         GPS           coordinate              N2147673.584
                                                                       24 E6690904.187 to N2147908.413 E6689057.060 associated



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 with the Western Pacific Interceptor Canal, is no longer


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00146   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              147
                                                                          1 authorized beginning on the date of the enactment of this
                                                                          2 Act.
                                                                          3        SEC. 316. RIO GRANDE ENVIRONMENTAL MANAGEMENT

                                                                          4                                PROGRAM, COLORADO, NEW MEXICO, AND

                                                                          5                                TEXAS.

                                                                          6              Section 5056(f) of the Water Resources Development
                                                                          7 Act of 2007 (Public Law 110–114, 121 Stat. 1213; 128 Stat.
                                                                          8 1314) is amended by striking ‘‘2019’’ and inserting ‘‘2029’’.
                                                                          9        SEC. 317. NEW LONDON HARBOR WATERFRONT CHANNEL,

                                                                       10                                  CONNECTICUT.

                                                                       11                (a) IN GENERAL.—The portion of the project for navi-
                                                                       12 gation, New London Harbor, Connecticut, authorized by the
                                                                       13 first section of the Act of June 13, 1902 (chapter 1079, 32
                                                                       14 Stat. 333), described in subsection (b) is no longer author-
                                                                       15 ized beginning on the date of enactment of this Act.
                                                                       16                (b) AREA DESCRIBED.—The area referred to in sub-
                                                                       17 section (a) is generally the portion between and around the
                                                                       18 2 piers at the State Pier in New London, specifically the
                                                                       19 area—
                                                                       20                         (1)        beginning              at        a      point          N691263.78,
                                                                       21                E1181259.26;
                                                                       22                         (2) running N 35°01’50.75’’ W about 955.59 feet
                                                                       23                to a point N692046.26, E1180710.74;
                                                                       24                         (3) running N 54°58’06.78’’ E about 100.00 feet



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                to a point N692103.66, E1180792.62;


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00147   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               148
                                                                          1                        (4) running S 35°01’50.75’’ E about 989.8 feet
                                                                          2               to a point N691293.17, E1181360.78; and
                                                                          3                        (5) running S 73°51’15.45’’ W about 105.69 feet
                                                                          4               to the point described in paragraph (1).
                                                                          5        SEC. 318. WASHINGTON HARBOR, DISTRICT OF COLUMBIA.

                                                                          6               Beginning on the date of enactment of this Act, the
                                                                          7 project for navigation, Washington Harbor, District of Co-
                                                                          8 lumbia, authorized by the Act of August 30, 1935 (chapter
                                                                          9 831, 49 Stat. 1031), is modified to reduce, in part, the au-
                                                                       10 thorized dimensions of the project, such that the remaining
                                                                       11 authorized dimensions are as follows:
                                                                       12                          (1) A 200 foot wide, 15 foot deep channel with
                                                                       13                 a center line beginning at a point East 1,317,064.30
                                                                       14                 and North 440,373.32, thence to a point East
                                                                       15                 1,316,474.30 and North 440,028.31, thence to a point
                                                                       16                 East 1,315,584.30 and North 439,388.30, thence to a
                                                                       17                 point East 1,315,259.31 and North 438,908.30.
                                                                       18                          (2) A transition area 200 foot wide to 300 foot
                                                                       19                 wide, 15 foot deep, with a center line beginning at a
                                                                       20                 point East 1,315,259.31 and North 438,908.30 to a
                                                                       21                 point East 1,315,044.31 and North 438,748.30.
                                                                       22                          (3) A 300 foot wide, 15 foot deep channel with
                                                                       23                 a centerline beginning a point East 1,315,044.31 and
                                                                       24                 North 438,748.30, thence to a point East 1,314,105.31



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 and North 438,124.79, thence to a point East


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00148   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               149
                                                                          1               1,311,973.30 and North 438,807.78, thence to a point
                                                                          2               East 1,311,369.73 and North 438,577.42, thence to a
                                                                          3               point East 1,311,015.73 and North 438,197.57, thence
                                                                          4               to a point East 1,309,713.47 and North 435,678.91.
                                                                          5                        (4) A transition area 300 foot wide to 400 foot
                                                                          6               wide, 15 foot deep to 24 foot deep, with a center line
                                                                          7               beginning at a point East 1,309,713.47 and North
                                                                          8               435,678.91 to a point East 1,307,709.33 and North
                                                                          9               434,488.25.
                                                                       10                          (5) A 400 foot wide, 24 foot deep channel with
                                                                       11                 a centerline beginning at a point East 1,307,709.33
                                                                       12                 and North 434,488.25, thence to a point East
                                                                       13                 1,307,459.33 and North 434,173.25, thence to a point
                                                                       14                 East 1,306,476.82 and North 1,306,476.82, thence to
                                                                       15                 a point East 1,306,209.79 and North 431,460.21,
                                                                       16                 thence to a point at the end of the channel near
                                                                       17                 Hains Point East 1,305,997.63 and North 429,978.31.
                                                                       18          SEC. 319. CENTRAL EVERGLADES, FLORIDA.

                                                                       19                 The project for ecosystem restoration, Central Ever-
                                                                       20 glades, authorized by section 1401(4) of the Water Resources
                                                                       21 Development Act of 2016 (130 Stat. 1713), is modified to
                                                                       22 include the project for ecosystem restoration, Central and
                                                                       23 Southern Florida, Everglades Agricultural Area, authorized
                                                                       24 by section 1308 of the Water Resources Development Act



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00149   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               150
                                                                          1 of 2018 (132 Stat. 3819), and to authorize the Secretary
                                                                          2 to carry out the project as so combined.
                                                                          3        SEC. 320. MIAMI RIVER, FLORIDA.

                                                                          4               The portion of the project for navigation, Miami River,
                                                                          5 Florida, authorized by the Act of July 3, 1930 (46 Stat.
                                                                          6 925; 59 Stat. 16; 74 Stat. 481; 100 Stat. 4257), beginning
                                                                          7 at the existing railroad bascule bridge and extending ap-
                                                                          8 proximately 1,000 linear feet upstream to an existing salin-
                                                                          9 ity barrier and flood control structure, is no longer author-
                                                                       10 ized beginning on the date of enactment of this Act.
                                                                       11          SEC. 321. TAYLOR CREEK RESERVOIR AND LEVEE L–73 (SEC-

                                                                       12                                   TION 1), UPPER ST. JOHNS RIVER BASIN,

                                                                       13                                   FLORIDA.

                                                                       14                 The portions of the project for flood control and other
                                                                       15 purposes, Central and Southern Florida, authorized by sec-
                                                                       16 tion 203 of the Flood Control Act of 1948 (62 Stat. 1176),
                                                                       17 consisting of the Taylor Creek Reservoir and Levee L–73,
                                                                       18 Section 1, within the Upper St. Johns River Basin, Flor-
                                                                       19 ida, are no longer authorized beginning on the date of en-
                                                                       20 actment of this Act.
                                                                       21          SEC. 322. CALCASIEU RIVER AND PASS, LOUISIANA.

                                                                       22                 Not later than 120 days after the date of enactment
                                                                       23 of this Act, the Secretary shall provide to the Committee
                                                                       24 on Transportation and Infrastructure of the House of Rep-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 resentatives and the Committee on Environment and Public


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00150   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               151
                                                                          1 Works of the Senate a report on plans to modify the
                                                                          2 Calcasieu River and Pass Dredged Material Management
                                                                          3 Plan and Supplemental Environmental Impact Statement
                                                                          4 (December 16, 2010 DMMP/SEIS) to allow for the expan-
                                                                          5 sion of Dredged Material Placement Facilities (DMPFs) 17,
                                                                          6 19, 22, D, and E to the lakeside foreshore rock boundaries
                                                                          7 during planned rehabilitation of these facilities.
                                                                          8        SEC. 323. SAN JUAN-CHAMA PROJECT; ABIQUIU DAM, NEW

                                                                          9                                 MEXICO.

                                                                       10                 (a) ABIQUIU RESERVOIR.—Section 5(b) of Public Law
                                                                       11 97–140 (43 U.S.C. 620a note) is amended by striking ‘‘a
                                                                       12 total of two hundred thousand acre-feet of’’.
                                                                       13                 (b) WATER STORAGE AT ABIQUIU DAM, NEW MEX-
                                                                       14          ICO.—Section 1 of Public Law 100–522 (43 U.S.C. 620a

                                                                       15 note) is amended—
                                                                       16                          (1) by striking ‘‘200,000 acre-feet of’’;
                                                                       17                          (2) by inserting ‘‘and San Juan-Chama project’’
                                                                       18                 after ‘‘Rio Grande system’’; and
                                                                       19                          (3) by striking ‘‘, in lieu of the water storage au-
                                                                       20                 thorized by section 5 of Public Law 97–140, to the ex-
                                                                       21                 tent that contracting entities under section 5 of Pub-
                                                                       22                 lic Law 97–140 no longer require such storage’’.
                                                                       23                 (c) WATER STORAGE.—The Secretary shall—
                                                                       24                          (1) store up to elevation 6230.00 NGVD29 at



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 Abiquiu Dam, New Mexico, to the extent that the nec-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00151   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              152
                                                                          1              essary real property interests have been acquired by
                                                                          2              any entity requesting such storage; and
                                                                          3                       (2) amend the March 20, 1986, contract between
                                                                          4              the United States of America and the Albuquerque
                                                                          5              Bernalillo County Water Utility Authority (assigned
                                                                          6              by the City of Albuquerque, New Mexico to the Albu-
                                                                          7              querque Bernalillo County Water Utility Authority)
                                                                          8              for water storage space in Abiquiu Reservoir to allow
                                                                          9              for storage by the Albuquerque Bernalillo County
                                                                       10                Water Utility Authority of San Juan-Chama project
                                                                       11                water or native Rio Grande system water up to ele-
                                                                       12                vation 6230.00 NGVD29.
                                                                       13                (d) STORAGE AGREEMENTS WITH USERS OTHER
                                                                       14 THAN THE ALBUQUERQUE BERNALILLO COUNTY WATER
                                                                       15 UTILITY AUTHORITY.—The Secretary shall—
                                                                       16                         (1) retain or enter into new agreements with en-
                                                                       17                tities for a proportionate allocation of 29,100 acre-feet
                                                                       18                of storage space pursuant to section 5 of Public Law
                                                                       19                97–140; and
                                                                       20                         (2) amend or enter into new storage agreements
                                                                       21                for storage of San Juan-Chama project water or na-
                                                                       22                tive Rio Grande system water up to the space allo-
                                                                       23                cated for each entity’s proportionate share of San
                                                                       24                Juan-Chama water.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00152   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              153
                                                                          1              (e) OPERATIONS DOCUMENTS.—The Secretary shall
                                                                          2 amend or revise any existing operations documents, includ-
                                                                          3 ing the Water Control Manual or operations plan for
                                                                          4 Abiquiu Reservoir, as necessary to meet the requirements
                                                                          5 of this section.
                                                                          6              (f) LIMITATIONS.—In carrying out this section, the fol-
                                                                          7 lowing limitations shall apply:
                                                                          8                       (1) The storage of native Rio Grande system
                                                                          9              water shall be subject to the provisions of the Rio
                                                                       10                Grande Compact and the resolutions of the Rio
                                                                       11                Grande Compact Commission.
                                                                       12                         (2) The storage of native Rio Grande system
                                                                       13                water shall only be authorized to the extent that the
                                                                       14                necessary water ownership and storage rights have
                                                                       15                been acquired by the entity requesting such storage.
                                                                       16                         (3) The storage of native Rio Grande system
                                                                       17                water or San-Juan Chama project water shall not
                                                                       18                interfere with the authorized purposes of the Abiquiu
                                                                       19                Dam and Reservoir project.
                                                                       20                         (4) Each user of storage space, regardless of
                                                                       21                source of water, shall pay for any increase in costs at-
                                                                       22                tributable to storage of that user’s water.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00153   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               154
                                                                          1        SEC. 324. PAWCATUCK RIVER, LITTLE NARRAGANSETT BAY

                                                                          2                                 AND WATCH HILL COVE, RHODE ISLAND AND

                                                                          3                                 CONNECTICUT.

                                                                          4               Beginning on the date of enactment of this Act, that
                                                                          5 portion of the project for navigation, Pawcatuck River, Lit-
                                                                          6 tle Narragansett Bay and Watch Hill Cove, Rhode Island
                                                                          7 and Connecticut, authorized by section 2 of the Act of
                                                                          8 March 2, 1945 (chapter 19, 59 Stat. 13), consisting of a
                                                                          9 10-foot deep, 16-acre anchorage area in Watch Hill Cove
                                                                       10 is no longer authorized.
                                                                       11          SEC. 325. HARRIS COUNTY, TEXAS.

                                                                       12                 Section 575 of the Water Resources Development Act
                                                                       13 of 1996 (110 Stat. 3789) is repealed.
                                                                       14          SEC. 326. CAP SANTE WATERWAY, WASHINGTON.

                                                                       15                 Beginning on the date of enactment of this Act, the
                                                                       16 project for navigation, Cap Sante Waterway and Naviga-
                                                                       17 tion Channel, Skagit County, Washington, authorized by
                                                                       18 the Act of March 2, 1919 (chapter 95, 40 Stat. 1285), is
                                                                       19 modified to deauthorize the portion of the project consisting
                                                                       20 of an approximately 334,434 foot area of the Federal chan-
                                                                       21 nel within Anacortes Harbor inside and directly adjacent
                                                                       22 to the Federal breakwater and training wall structure,
                                                                       23 starting at a point with coordinates N557015.552,
                                                                       24 E1210819.619, thence running S88 13’2.06’’E approxi-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 mately 200 feet to a point with coordinates N557009.330,
                                                                       26 E1211019.522, thence running S01 46’58.08’’W approxi-
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00154   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               155
                                                                          1 mately 578 feet to a point with coordinates N556431.405,
                                                                          2 E1211001.534, thence running S49 49’50.23’’W approxi-
                                                                          3 mately 69 feet to a point with coordinates N556387.076,
                                                                          4 E1210949.002, thence running S51 53’0.25’’E approxi-
                                                                          5 mately 35 feet to a point with coordinates N556365.662,
                                                                          6 E1210976.316, thence running S49 38’58.48’’W approxi-
                                                                          7 mately 112 feet to a point with coordinates N556292.989,
                                                                          8 E1210890.775, thence running N88 13’1.87’’W approxi-
                                                                          9 mately 109 feet to a point with coordinates N556296.367,
                                                                       10 E1210782.226, thence running S46 46’58.97’’W approxi-
                                                                       11 mately 141 feet to a point with coordinates N556199.527,
                                                                       12 E1210679.164, thence running N88 13’1.77’’W approxi-
                                                                       13 mately 700 feet to a point with coordinates N556221.305,
                                                                       14 E1209979.502, thence running N01 46’58.08’’E approxi-
                                                                       15 mately 250 feet to a point with coordinates N556471.184,
                                                                       16 E1209987.280, thence running S88 13’1.77’’E approxi-
                                                                       17 mately 815 feet to a point with coordinates N556445.828,
                                                                       18 E1210801.886, thence running N01 46’58.08’’E approxi-
                                                                       19 mately 570 feet to the point of origin.
                                                                       20          SEC. 327. REGIONAL SEDIMENT MANAGEMENT.

                                                                       21                 The Secretary shall expedite the activities required to
                                                                       22 be carried out under section 204 of the Water Resources De-
                                                                       23 velopment Act of 1992 (33 U.S.C. 2326) regarding the use
                                                                       24 of improvement dredging of the Portsmouth Federal naviga-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 tion project in Portsmouth, New Hampshire, as a source


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00155   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                                156
                                                                          1 of clean beach fill material to reinforce the stone revetment
                                                                          2 at Nantasket Beach, Hull, Massachusetts.
                                                                          3        SEC.          328.     ADDITIONAL                 ASSISTANCE                FOR          CRITICAL

                                                                          4                                  PROJECTS.

                                                                          5               (a) CONSISTENCY WITH REPORTS.—Congress finds
                                                                          6 that the project modifications described in this section are
                                                                          7 in accordance with the reports submitted to Congress by the
                                                                          8 Secretary under section 7001 of the Water Resources Reform
                                                                          9 and Development Act of 2014 (33 U.S.C. 2282d), titled ‘‘Re-
                                                                       10 port to Congress on Future Water Resources Development’’,
                                                                       11 or have otherwise been reviewed by Congress.
                                                                       12                 (b) MODIFICATIONS.—
                                                                       13                           (1) SACRAMENTO                      AREA, CALIFORNIA.—Section

                                                                       14                 219(f)(23) of the Water Resources Development Act of
                                                                       15                 1992 (106 Stat. 4835; 113 Stat. 336; 117 Stat. 1840)
                                                                       16                 is amended to read as follows:
                                                                       17                           ‘‘(23)         SACRAMENTO                     AREA,             CALIFORNIA.—

                                                                       18                 $45,000,000 for regional water conservation, recy-
                                                                       19                 cling, reliability, and resiliency projects in Placer, El
                                                                       20                 Dorado, and Sacramento Counties and the San Juan
                                                                       21                 Suburban Water District, California.’’.
                                                                       22                           (2)        SOUTH                PERRIS,          CALIFORNIA.—Section

                                                                       23                 219(f)(52) of the Water Resources Development Act of
                                                                       24                 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200    PO 00000   Frm 00156   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              157
                                                                          1              2763A–220) is amended by striking ‘‘$25,000,000’’
                                                                          2              and inserting ‘‘$50,000,000’’.
                                                                          3                       (3) MADISON AND ST. CLAIR COUNTIES, ILLI-
                                                                          4              NOIS.—Section 219(f)(55) of the Water Resources De-

                                                                          5              velopment Act of 1992 (106 Stat. 4835; 113 Stat. 335;
                                                                          6              114 Stat. 2763A–221) is amended by striking
                                                                          7              ‘‘$10,000,000’’ and inserting ‘‘$45,000,000’’.
                                                                          8                       (4) SOUTHERN AND EASTERN KENTUCKY.—Sec-
                                                                          9              tion 531 of the Water Resources Development Act of
                                                                       10                1996 (110 Stat. 3773; 113 Stat. 348; 117 Stat. 142;
                                                                       11                121 Stat. 1226) is amended—
                                                                       12                                  (A) in subsection (g), by inserting ‘‘Boyd,
                                                                       13                         Carter, Elliott, Lincoln,’’ after ‘‘Lee,’’; and
                                                                       14                                  (B)         in         subsection           (h),        by     striking
                                                                       15                         ‘‘$40,000,000’’ and inserting ‘‘$80,000,000’’.
                                                                       16                         (5)       DESOTO                COUNTY,          MISSISSIPPI.—Section

                                                                       17                219(f)(30) of the Water Resources Development Act of
                                                                       18                1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.
                                                                       19                2763A–220; 119 Stat. 282; 119 Stat. 2257; 122 Stat.
                                                                       20                1623) is amended by striking ‘‘$75,000,000’’ and in-
                                                                       21                serting ‘‘$130,000,000’’.
                                                                       22                         (6) JACKSON                     COUNTY,          MISSISSIPPI.—Section

                                                                       23                219(e)(1) of the Water Resources Development Act of
                                                                       24                1992 (106 Stat. 4835; 110 Stat. 3757; 113 Stat. 1494;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00157   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              158
                                                                          1              121         Stat.         1258)             is        amended              by      striking
                                                                          2              ‘‘$32,500,000’’ and inserting ‘‘$57,500,000’’.
                                                                          3                       (7) ST. LOUIS, MISSOURI.—Section 219(f)(32) of
                                                                          4              the Water Resources Development Act of 1992 (106
                                                                          5              Stat. 4835; 113 Stat. 337; 121 Stat. 1233) is amend-
                                                                          6              ed        by       striking              ‘‘$35,000,000’’              and         inserting
                                                                          7              ‘‘$70,000,000’’.
                                                                          8                       (8)         MIDWEST                 CITY,           OKLAHOMA.—Section

                                                                          9              219(f)(231) of the Water Resources Development Act
                                                                       10                of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat.
                                                                       11                1266) is amended by striking ‘‘$2,000,000’’ and in-
                                                                       12                serting ‘‘$5,000,000’’.
                                                                       13                         (9) SOUTH                 CENTRAL             PENNSYLVANIA.—Section

                                                                       14                313 of the Water Resources Development Act of 1992
                                                                       15                (106 Stat. 4845; 109 Stat. 407; 110 Stat. 3723; 113
                                                                       16                Stat. 310; 117 Stat. 142; 121 Stat. 1146) is amend-
                                                                       17                ed—
                                                                       18                                  (A)         in    subsection              (g)(1),         by     striking
                                                                       19                         ‘‘$200,000,000’’ and inserting ‘‘$400,000,000’’;
                                                                       20                         and
                                                                       21                                  (B) in subsection (h)(2), by inserting ‘‘Bea-
                                                                       22                         ver, Jefferson,’’ after ‘‘Washington,’’.
                                                                       23                         (10) LAKES                MARION             AND       MOULTRIE,           SOUTH

                                                                       24                CAROLINA.—Section 219(f)(25) of the Water Resources




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                Development Act of 1992 (106 Stat. 4835; 113 Stat.


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00158   Fmt 6652    Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              159
                                                                          1              336; 114 Stat. 2763A–220; 117 Stat. 1838; 130 Stat.
                                                                          2              1677; 132 Stat. 3818) is amended by striking
                                                                          3              ‘‘$89,550,000’’ and inserting ‘‘$110,000,000’’.
                                                                          4                       (11)         EL         PASO          COUNTY,             TEXAS.—Section

                                                                          5              219(f)(269) of the Water Resources Development Act
                                                                          6              of 1992 (106 Stat. 4835; 113 Stat. 336; 121 Stat.
                                                                          7              1268) is amended by striking ‘‘$25,000,000’’ and in-
                                                                          8              serting ‘‘$75,000,000’’.
                                                                          9                       (12) WESTERN RURAL WATER.—Section 595 of
                                                                       10                the Water Resources Development Act of 1999 (113
                                                                       11                Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat.
                                                                       12                1836; 118 Stat. 440; 121 Stat. 1219; 123 Stat. 2851;
                                                                       13                128 Stat. 1316; 130 Stat. 1681) is amended—
                                                                       14                                  (A) by striking the section heading and in-
                                                                       15                         serting ‘‘WESTERN RURAL WATER.’’;
                                                                       16                                  (B) in subsections (b) and (c), by inserting
                                                                       17                         ‘‘Arizona,’’ before ‘‘Idaho’’ each place it appears;
                                                                       18                         and
                                                                       19                                  (C) in subsection (i), by striking ‘‘for the
                                                                       20                         period          beginning              with         fiscal        year   2001,
                                                                       21                         $435,000,000, to remain available until ex-
                                                                       22                         pended.’’ and inserting the following: ‘‘, to re-
                                                                       23                         main available until expended—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00159   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               160
                                                                          1                        ‘‘(1) for the period beginning with fiscal year
                                                                          2               2001, $435,000,000 for Idaho, Montana, rural Ne-
                                                                          3               vada, New Mexico, rural Utah, and Wyoming; and
                                                                          4                        ‘‘(2) $150,000,000 for Arizona.’’.
                                                                          5                        (13) CENTRAL WEST VIRGINIA.—Section 571(h)
                                                                          6               of the Water Resources Development Act of 1999 (113
                                                                          7               Stat. 371; 121 Stat. 1257) is amended by striking
                                                                          8               ‘‘$20,000,000’’ and inserting ‘‘$40,000,000’’.
                                                                          9                        (14) SOUTHERN WEST VIRGINIA.—Section 340(g)
                                                                       10                 of the Water Resources Development Act of 1992 (106
                                                                       11                 Stat. 4856; 110 Stat. 3727; 113 Stat. 320) is amend-
                                                                       12                 ed        by       striking              ‘‘$40,000,000’’              and         inserting
                                                                       13                 ‘‘$120,000,000’’.
                                                                       14                 (c) LOWELL CREEK TUNNEL, SEWARD, ALASKA.—Sec-
                                                                       15 tion 5032(a)(2) of the Water Resources Development Act of
                                                                       16 2007 (Public Law 110–114, 121 Stat. 1205) is amended
                                                                       17 by striking ‘‘15’’ and inserting ‘‘20’’.
                                                                       18          SEC. 329. PROJECT MODIFICATION AUTHORIZATIONS.

                                                                       19                 (a) WATER SUPPLY.—The following project modifica-
                                                                       20 tions for water supply, as identified in the report entitled
                                                                       21 ‘‘Report to Congress on Future Water Resources Develop-
                                                                       22 ment’’ dated February 2019, and submitted to Congress on
                                                                       23 June 3, 2019, pursuant to section 7001 of the Water Re-
                                                                       24 sources Reform and Development Act of 2014 (33 U.S.C.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 2282d) or otherwise reviewed by Congress, are authorized


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00160   Fmt 6652    Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              161
                                                                          1 to be carried out by the Secretary substantially in accord-
                                                                          2 ance with the recommendations, included in such report
                                                                          3 pursuant to section 301(c) of the Water Supply Act of 1958
                                                                          4 (43 U.S.C. 390b(c)):
                                                                          5                       (1) The project modification for the State of Mis-
                                                                          6              souri, Clarence Cannon Dam and Mark Twain Lake
                                                                          7              Project Salt River, Missouri.
                                                                          8                       (2) The project modification for the City of
                                                                          9              Plattsburg, Smithville Lake, Missouri.
                                                                       10                         (3) The project modification for the City of
                                                                       11                Smithville, Smithville Lake, Missouri.
                                                                       12                (b) FLOOD RISK MANAGEMENT.—The following project
                                                                       13 modifications for flood risk management, as identified in
                                                                       14 a report entitled ‘‘Report to Congress on Future Water Re-
                                                                       15 sources Development’’, and submitted to Congress pursuant
                                                                       16 to section 7001 of the Water Resources Reform and Develop-
                                                                       17 ment Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed
                                                                       18 by Congress, are authorized to be carried out by the Sec-
                                                                       19 retary:
                                                                       20                         (1) Modification of the project for flood risk
                                                                       21                management, lower Mississippi River, authorized by
                                                                       22                the Act of May 15, 1928 (chapter 569, 45 Stat. 534),
                                                                       23                to incorporate the Wolf River Backwater and
                                                                       24                Nonconnah Creek levee systems into the project, au-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                thorized by section 5 of the Act of June 22, 1936


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00161   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               162
                                                                          1               (chapter 688, 49 Stat. 1575; 50 Stat. 881), subject to
                                                                          2               the determination of the Secretary that such systems
                                                                          3               meet all requirements applicable to such project.
                                                                          4                        (2) Modification of the project for flood risk
                                                                          5               management, Red River below Denison Dam, Arkan-
                                                                          6               sas, Louisiana, and Texas, authorized by the Act of
                                                                          7               June 28, 1938 (chapter 795, 52 Stat. 1219), to incor-
                                                                          8               porate the Cherokee Park Levee into the project, sub-
                                                                          9               ject to the determination of the Secretary that such
                                                                       10                 levee meets all requirements applicable to such
                                                                       11                 project.
                                                                       12          SEC. 330. APPLICATION OF CREDIT.

                                                                       13                 Section 7007(d) of the Water Resources Development
                                                                       14 Act of 2007 (121 Stat. 1277; 128 Stat. 1226) is amended
                                                                       15 by inserting ‘‘, or may be applied to reduce the amounts
                                                                       16 required to be paid by the non-Federal interest under the
                                                                       17 terms of the deferred payment agreements entered into be-
                                                                       18 tween the Secretary and the non-Federal interest for the
                                                                       19 projects authorized by section 7012(a)(1)’’ before the period
                                                                       20 at the end.
                                                                       21          SEC. 331. PROJECT REAUTHORIZATIONS.

                                                                       22                 (a) IN GENERAL.—
                                                                       23                          (1) MUDDY RIVER, MASSACHUSETTS.—The sepa-
                                                                       24                 rable elements for ecosystem restoration of the project



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 for flood damage reduction and environmental res-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00162   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              163
                                                                          1              toration, Muddy River, Brookline and Boston, Massa-
                                                                          2              chusetts, authorized by section 522 of the Water Re-
                                                                          3              sources Development Act of 2000 (114 Stat. 2656),
                                                                          4              and deauthorized pursuant to section 6001 of the
                                                                          5              Water Resources Reform and Development Act of
                                                                          6              2014 (128 Stat. 1345), are authorized to be carried
                                                                          7              out by the Secretary, subject to subsection (b).
                                                                          8                       (2) EAST CHESTER CREEK, NEW YORK.—Not-
                                                                          9              withstanding section 1001 of the Water Resources De-
                                                                       10                velopment Act of 1986 (33 U.S.C. 579a), the project
                                                                       11                for navigation, East Chester Creek, New York, author-
                                                                       12                ized by section 101 of the River and Harbor Act of
                                                                       13                1950 (64 Stat. 164; 100 Stat. 4181), and deauthor-
                                                                       14                ized pursuant to section 1001 of the Water Resources
                                                                       15                Development Act of 1986 (33 U.S.C. 579(a)), is au-
                                                                       16                thorized to be carried out by the Secretary, subject to
                                                                       17                subsection (b).
                                                                       18                         (3) CHRISTIANSTED HARBOR, UNITED STATES
                                                                       19                VIRGIN ISLANDS.—Notwithstanding                                     section 1002 of
                                                                       20                the Water Resources Development Act of 1986 (100
                                                                       21                Stat. 4221), the portion of the project for navigation,
                                                                       22                Christiansted Harbor, St. Croix, United States Virgin
                                                                       23                Islands, authorized by section 101 of the River and
                                                                       24                Harbor Act of 1950 (64 Stat. 167), and deauthorized



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                under section 1002 of the Water Resources Develop-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00163   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               164
                                                                          1               ment Act of 1986 (100 Stat. 4221), is authorized to
                                                                          2               be carried out by the Secretary, subject to subsection
                                                                          3               (b).
                                                                          4                        (4) CHARLOTTE HARBOR, UNITED STATES VIRGIN
                                                                          5               ISLANDS.—Notwithstanding section 1002 of the Water

                                                                          6               Resources Development Act of 1986 (100 Stat. 4221),
                                                                          7               the portion of the project for navigation, Charlotte
                                                                          8               Amalie (St. Thomas) Harbor, St. Thomas, United
                                                                          9               States Virgin Islands, authorized by the Act of August
                                                                       10                 26, 1937 (chapter 832, 50 Stat. 850), and deauthor-
                                                                       11                 ized under section 1002 of the Water Resources Devel-
                                                                       12                 opment Act of 1986 (100 Stat. 4221), is authorized to
                                                                       13                 be carried out by the Secretary, subject to subsection
                                                                       14                 (b).
                                                                       15                 (b) REPORT TO CONGRESS.—The Secretary shall com-
                                                                       16 plete and submit to the Committee on Transportation and
                                                                       17 Infrastructure of the House of Representatives and the Com-
                                                                       18 mittee on Environment and Public Works of the Senate a
                                                                       19 post-authorization change report (as such term is defined
                                                                       20 in section 1132(d) of the Water Resources Development Act
                                                                       21 of 2016 (33 U.S.C. 2282e(d)) prior to carrying out a project
                                                                       22 identified in subsection (a).
                                                                       23          SEC. 332. CONVEYANCES.

                                                                       24                 (a) GENERALLY APPLICABLE PROVISIONS.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00164   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              165
                                                                          1                       (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—
                                                                          2              The exact acreage and the legal description of any
                                                                          3              real property to be conveyed under this section shall
                                                                          4              be determined by a survey that is satisfactory to the
                                                                          5              Secretary.
                                                                          6                       (2) APPLICABILITY                      OF      PROPERTY             SCREENING

                                                                          7              PROVISIONS.—Section 2696 of title 10, United States

                                                                          8              Code, shall not apply to any conveyance under this
                                                                          9              section.
                                                                       10                         (3) COSTS OF CONVEYANCE.—An entity to which
                                                                       11                a conveyance is made under this section shall be re-
                                                                       12                sponsible for all reasonable and necessary costs, in-
                                                                       13                cluding real estate transaction and environmental
                                                                       14                documentation costs, associated with the conveyance.
                                                                       15                         (4) LIABILITY.—An entity to which a conveyance
                                                                       16                is made under this section shall hold the United
                                                                       17                States harmless from any liability with respect to ac-
                                                                       18                tivities carried out, on or after the date of the convey-
                                                                       19                ance, on the real property conveyed. The United
                                                                       20                States shall remain responsible for any liability with
                                                                       21                respect to activities carried out, before such date, on
                                                                       22                the real property conveyed.
                                                                       23                         (5) ADDITIONAL TERMS AND CONDITIONS.—The
                                                                       24                Secretary may require that any conveyance under



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                this section be subject to such additional terms and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00165   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              166
                                                                          1              conditions as the Secretary considers necessary and
                                                                          2              appropriate to protect the interests of the United
                                                                          3              States.
                                                                          4              (b) EUFAULA, ALABAMA.—
                                                                          5                       (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                          6              shall convey to the City of Eufaula, Alabama, all
                                                                          7              right, title, and interest of the United States in and
                                                                          8              to the real property described in the Department of
                                                                          9              the Army Lease No. DACW01–2–17–0747, containing
                                                                       10                56.76 acres, more or less, and being a part of Tracts
                                                                       11                L–1268 (26.12 acres), L–1273 (13.71 acres), L–1278
                                                                       12                (6.75 acres), and L1279 (10.36 acres) of the Walter
                                                                       13                F. George Lock and Dam and Lake project.
                                                                       14                         (2) DEED.—The Secretary shall convey the prop-
                                                                       15                erty under this subsection by quitclaim deed under
                                                                       16                such terms and conditions as the Secretary deter-
                                                                       17                mines appropriate to protect the interests of the
                                                                       18                United States.
                                                                       19                         (3) CONSIDERATION.—The City of Eufaula, Ala-
                                                                       20                bama, shall pay to the Secretary an amount that is
                                                                       21                not less than the fair market value of the property
                                                                       22                conveyed under this subsection, as determined by the
                                                                       23                Secretary.
                                                                       24                (c) MONTGOMERY, ALABAMA.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00166   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              167
                                                                          1                       (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                          2              shall convey to the City of Montgomery, Alabama, all
                                                                          3              right, title, and interest of the United States in and
                                                                          4              to the real property described in paragraph (2).
                                                                          5                       (2) PROPERTY.—The property to be conveyed is
                                                                          6              the 62.38 acres of land and water under the primary
                                                                          7              jurisdiction of the Secretary in the R.E. ‘‘Bob’’ Wood-
                                                                          8              ruff Project Area that is covered by lease number
                                                                          9              DACW01–1–05–0037, including the parcels and
                                                                       10                structure known as ‘‘Powder Magazine’’.
                                                                       11                         (3) DEED.—The Secretary shall convey the prop-
                                                                       12                erty under this subsection by quitclaim deed under
                                                                       13                such terms and conditions as the Secretary deter-
                                                                       14                mines appropriate to protect the interests of the
                                                                       15                United States, to include retaining the right to inun-
                                                                       16                date with water any land transferred under this sub-
                                                                       17                section.
                                                                       18                         (4) CONSIDERATION.—The City of Montgomery,
                                                                       19                Alabama, shall pay to the Secretary an amount that
                                                                       20                is not less than the fair market value of the property
                                                                       21                conveyed under this subsection, as determined by the
                                                                       22                Secretary.
                                                                       23                (d) OHIO RIVER LOCK AND DAM NUMBER 52, MASSAC
                                                                       24 COUNTY, ILLINOIS.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00167   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              168
                                                                          1                       (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                          2              shall convey to the Massac-Metropolis Port District,
                                                                          3              Illinois, all right, title, and interest of the United
                                                                          4              States in and to any real property located north of
                                                                          5              the south bank of the Ohio River in Massac County,
                                                                          6              Illinois, that is associated with the Ohio River Lock
                                                                          7              and Dam 52.
                                                                          8                       (2) DEED.—The Secretary shall convey the prop-
                                                                          9              erty under this subsection by quitclaim deed under
                                                                       10                such terms and conditions as the Secretary deter-
                                                                       11                mines appropriate to protect the interests of the
                                                                       12                United States.
                                                                       13                         (3)       CONSIDERATION.—The                            Massac-Metropolis
                                                                       14                Port District, Illinois, shall pay to the Secretary an
                                                                       15                amount that is not less than fair market value of the
                                                                       16                property conveyed under this subsection, as deter-
                                                                       17                mined by the Secretary.
                                                                       18                (e) CLINTON, MISSOURI.—
                                                                       19                         (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       20                shall convey to the City of Clinton, Missouri, without
                                                                       21                consideration, all right, title, and interest of the
                                                                       22                United States in and to the real property described
                                                                       23                in paragraph (2).
                                                                       24                         (4) PROPERTY.—The property to be conveyed is



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                a tract of land situated in the S 1⁄2 of Section 12 and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00168   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              169
                                                                          1              the N 1⁄2 of Section 13, Township 41 North, Range 26
                                                                          2              West of the Fifth Principal Meridian, Henry County,
                                                                          3              Missouri, more particularly described as follows: Be-
                                                                          4              ginning at the point of intersection of the north line
                                                                          5              of said S 1⁄2 of Section 12 and the easterly right-of-
                                                                          6              way of State Highway No. 13; thence easterly along
                                                                          7              the north line of said S 1⁄2 to the northeast corner of
                                                                          8              the W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 of said Section 12;
                                                                          9              thence southerly along the east line of said W 1⁄2 NW
                                                                       10                14⁄ NE 1⁄4 SW 1⁄4 to the southeast corner thereof;
                                                                       11                thence easterly along the north line of the S 1⁄2 NE
                                                                       12                14⁄ SW 1⁄4 of said Section 12 to the southwest corner
                                                                       13                of the W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 of said Section 12;
                                                                       14                thence in a northeasterly direction to the northeast
                                                                       15                corner of said W 1⁄2 NW 1⁄4 NW 1⁄4 SE 1⁄4 ; thence
                                                                       16                easterly along the north line of said S 1⁄2 to the west-
                                                                       17                erly right-of-way of the County Road; thence in a
                                                                       18                southeasterly and southerly direction along the west-
                                                                       19                erly right-of-way of said County Road approximately
                                                                       20                2500 feet to the center of Deer Creek; thence in a
                                                                       21                southwesterly direction along the center of said Deer
                                                                       22                Creek, approximately 3900 feet to the south line of
                                                                       23                said N 1⁄2 of Section 13; thence westerly along the
                                                                       24                south line of said N 1⁄2 to the easterly right-of-way



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                line of the St. Louis-San Francisco Railroad; thence


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00169   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              170
                                                                          1              in a northwesterly direction along the easterly right-
                                                                          2              of-way of said railroad to the easterly right-of-way of
                                                                          3              said State Highway No. 13; thence in a northeasterly
                                                                          4              direction along the easterly right-of-way of said State
                                                                          5              Highway No. 13 to the point of the beginning; and
                                                                          6              including a roadway easement for ingress and egress,
                                                                          7              described as a strip of land 80 feet in width, lying
                                                                          8              40 feet on each side of the following described line, the
                                                                          9              initial extremities of the following described strip
                                                                       10                being extended or reduced as required to exactly ad-
                                                                       11                join the boundary lines which they meet, situated in
                                                                       12                the S 1⁄2 of Section 12, Township 41 North Range 26
                                                                       13                West of the Fifth Principal Meridian, Henry County,
                                                                       14                Missouri, more particularly described as follows:
                                                                       15                Commencing at the center of said Section 12, thence
                                                                       16                Sl°24’56’’W,              1265.52             feet       to     a        point,   thence
                                                                       17                N88°29’02’’W, 483.97 feet to the point of beginning of
                                                                       18                the strip of land herein described; thence in a north-
                                                                       19                easterly direction along a curve to the right, said
                                                                       20                curve         having            an       initial          tangent           bearing   of
                                                                       21                N3°44’4l’’E, a radius of 238.73 feet and an interior
                                                                       22                angle of 61°29’26’’, an arc distance of 256.21 feet to
                                                                       23                a point; thence N65°14’07’’E 218.58 feet to a point;
                                                                       24                thence in a northeasterly direction along a curve to



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                the left, having a radius of 674.07 feet and an inte-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00170   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              171
                                                                          1              rior angle of 36°00’01’’, an arc distance of 423.53 feet
                                                                          2              to a point; thence N29°14’07’’E, 417.87 feet to a
                                                                          3              point; thence northeasterly along a curve to the right,
                                                                          4              having a radius of 818.51 feet and an interior angle
                                                                          5              of 14°30’01’’, an arc distance of 207.15 feet to a
                                                                          6              point; thence N43°44’07’’E, 57.00 feet to the southerly
                                                                          7              right-of-way line of a county road, containing 2,948
                                                                          8              acres, more or less; Excluding therefrom a tract of
                                                                          9              land situated in the S 1⁄2 of said Section 12, said
                                                                       10                Township and Range, described as commencing at the
                                                                       11                center of said Section 12; thence S1°24’56’’W, 1265.52
                                                                       12                feet to the point of beginning of the tract of land here-
                                                                       13                in described; thence N88°29’02″W, 1122.50 feet; thence
                                                                       14                S1°43’26″W,                   872.62         feet;       thence          S88°29’02’’E,
                                                                       15                1337.36 feet; thence Nl°43’26’’E, 872.62 feet; thence
                                                                       16                N88°29’02’’W, 214.86 feet to the point of beginning,
                                                                       17                containing 26.79 acres, more or less. The above de-
                                                                       18                scribed tract contains, in the aggregate, 177.69 acres,
                                                                       19                more or less.
                                                                       20                         (2) DEED.—The Secretary shall convey the prop-
                                                                       21                erty under this subsection by quitclaim deed under
                                                                       22                such terms and conditions as the Secretary deter-
                                                                       23                mines appropriate to protect the interests of the
                                                                       24                United States.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00171   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              172
                                                                          1                       (3) REVERSION.—If the Secretary determines
                                                                          2              that the property conveyed under this subsection is
                                                                          3              not being used for a public purpose, all right, title,
                                                                          4              and interest in and to the property shall revert, at the
                                                                          5              discretion of the Secretary, to the United States.
                                                                          6              (f) CITY OF CLINTON, OLD ORCHARD ADDITION, MIS-
                                                                          7        SOURI.—

                                                                          8                       (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                          9              shall convey to the City of Clinton, Missouri, all
                                                                       10                right, title, and interest of the United States in and
                                                                       11                to the real property described in paragraph (2).
                                                                       12                         (2) PROPERTY.—The property to be conveyed is
                                                                       13                Lot 28 in Old Orchard Addition, a subdivision of the
                                                                       14                City of Clinton, Henry County, Missouri, containing
                                                                       15                0.36 acres, more or less, including any improvements
                                                                       16                thereon.
                                                                       17                         (3) DEED.—The Secretary shall convey the prop-
                                                                       18                erty under this subsection by quitclaim deed under
                                                                       19                such terms and conditions as the Secretary deter-
                                                                       20                mines appropriate to protect the interests of the
                                                                       21                United States, including such reservations, terms, and
                                                                       22                conditions as the Secretary determines necessary to
                                                                       23                allow the United States to operate and maintain the
                                                                       24                Harry S. Truman Reservoir Project.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00172   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              173
                                                                          1                       (4) CONSIDERATION.—The City of Clinton, Mis-
                                                                          2              souri, shall pay to the Secretary an amount that is
                                                                          3              not less than the fair market value of the property
                                                                          4              conveyed under this subsection, as determined by the
                                                                          5              Secretary.
                                                                          6              (g) TRI-COUNTY LEVEE DISTRICT, MISSOURI.—
                                                                          7                       (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                          8              shall convey to the Tri-County Levee District, Mis-
                                                                          9              souri, all right, title, and interest of the United States
                                                                       10                in and to the real property described in paragraph
                                                                       11                (2).
                                                                       12                         (2) PROPERTY.—The property to be conveyed is
                                                                       13                the part of Sections 1 and 12 Township 45 North
                                                                       14                Range 6 West of the 5th P.M. in Montgomery County,
                                                                       15                Missouri, described as follows: A tract of land being
                                                                       16                60’ wide and lying South and East of and adjoining
                                                                       17                the centerline of the existing levee and being described
                                                                       18                as follows: Commencing at the NW corner of Section
                                                                       19                12, thence S 87° 52’ 35’’ E 587.4’, thence S 01° 29’
                                                                       20                25’’ W 453.68’ to the point of the beginning; said
                                                                       21                point being in the center of the levee, thence with the
                                                                       22                centerline of the levee N 77° 01’ 30’’ E 164.92’, thence
                                                                       23                N 74° 26’ 55’’ E 250.0’, thence N 72° 27’ 55’’ E
                                                                       24                270.0’, thence N 69° 06’ 10’’ E 300.0’, thence N 66°



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                42’ 15’’ E 500.0’, thence N 64° 14’ 30’’ E 270.0’,


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00173   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              174
                                                                          1              thence N 61° 09’ 10’’ E 800.0’, thence N 60° 58’ 15’’
                                                                          2              E 1724.45’, thence leaving the centerline S 01° 10’
                                                                          3              35’’ W 69.43’, thence parallel with the above described
                                                                          4              centerline S 60° 58’ 15’’ W 1689.62’, thence S 61° 09’
                                                                          5              10’’ W 801.71’, thence S 64° 14’ 30’’ W 272.91’,
                                                                          6              thence S 66° 42’ 15’’ W 502.55’, thence S 69° 06’ 10’’
                                                                          7              W 303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S
                                                                          8              74° 26’ 55’’ W 252.39’, thence S 77° 01’ 30’’ W
                                                                          9              181.75’, thence leaving the South side of the levee N
                                                                       10                01° 26’ 25’’ E 61.96’ to the point of beginning and
                                                                       11                containing 5.89 acres more or less.
                                                                       12                         (3) DEED.—The Secretary shall convey the prop-
                                                                       13                erty under this subsection by quitclaim deed under
                                                                       14                such terms and conditions as the Secretary deter-
                                                                       15                mines appropriate to protect the interests of the
                                                                       16                United States.
                                                                       17                         (4) CONSIDERATION.—The Tri-County Levee
                                                                       18                District, Missouri, shall pay to the Secretary an
                                                                       19                amount that is not less than the fair market value of
                                                                       20                the property conveyed under this subsection, as deter-
                                                                       21                mined by the Secretary.
                                                                       22                (h) JUDGE JOSEPH BARKER, JR., HOUSE, OHIO.—
                                                                       23                         (1) NON-FEDERAL ENTITY.—In this subsection,
                                                                       24                the term ‘‘non-Federal entity’’ means the Friends of



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00174   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              175
                                                                          1              Joseph Barker, Jr., House, a nonprofit organization
                                                                          2              in the State of Ohio.
                                                                          3                       (2) CONVEYANCE AUTHORIZED.—
                                                                          4                                (A) IN          GENERAL.—Subject                       to paragraph
                                                                          5                       (6), the Secretary shall convey to the non-Federal
                                                                          6                       entity, without consideration, all right, title, and
                                                                          7                       interest of the United States in and to the prop-
                                                                          8                       erty described in paragraph (3)(A).
                                                                          9                                (B) EASEMENT.—Upon conveyance of the
                                                                       10                         property under subparagraph (A), the Secretary
                                                                       11                         shall provide to the non-Federal entity, without
                                                                       12                         consideration, an easement over the property de-
                                                                       13                         scribed in paragraph (3)(B) for access to the
                                                                       14                         conveyed property for as long as the non-Federal
                                                                       15                         entity is in legal possession of the conveyed prop-
                                                                       16                         erty.
                                                                       17                         (3) DESCRIPTIONS OF PROPERTY.—
                                                                       18                                  (A) IN GENERAL.—The property referred to
                                                                       19                         in paragraph (2)(A) is the following (as in exist-
                                                                       20                         ence on the date of enactment of this Act):
                                                                       21                                          (i)       JUDGE            JOSEPH              BARKER,   JR.,

                                                                       22                                  HOUSE.—The tract of land situated in the

                                                                       23                                  State of Ohio, Washington County, on the
                                                                       24                                  Ohio River, and being particularly bounded



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  and described as follows: Beginning at a


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00175   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              176
                                                                          1                                point located on the southern right-of-way
                                                                          2                                line of Ohio Route 7, a new corner to the
                                                                          3                                land now or formerly owned by the United
                                                                          4                                States of America; thence, leaving the right-
                                                                          5                                of-way of said Route 7 and severing the
                                                                          6                                land of said United States of America par-
                                                                          7                                allel to and approximately 10 feet easterly
                                                                          8                                of the toe of the existing dredge disposal
                                                                          9                                berm, southeasterly approximately 326 feet
                                                                       10                                  to a point prior to the current Corps of En-
                                                                       11                                  gineers access to the dredging spoil area;
                                                                       12                                  thence, northeasterly approximately 480 feet
                                                                       13                                  paralleling the top of the slope to the river-
                                                                       14                                  bank side of the house and approximately
                                                                       15                                  25 feet northerly therefrom; thence, north-
                                                                       16                                  west approximately 302 feet to a point in
                                                                       17                                  the southern right-of-way of Ohio Route 7;
                                                                       18                                  thence with the right-of-way of said Route
                                                                       19                                  7, southwesterly approximately 485 feet to
                                                                       20                                  the point of beginning, containing approxi-
                                                                       21                                  mately 3.51 acres.
                                                                       22                                          (ii) ROAD TRACT.—The tract of land
                                                                       23                                  situated in the State of Ohio, Washington
                                                                       24                                  County, on the Ohio River, and being par-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  ticularly bounded and described as follows:


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00176   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              177
                                                                          1                                Beginning at a point located on the south-
                                                                          2                                ern right-of-way line of Ohio Route 7, a
                                                                          3                                new corner to the land now or formerly
                                                                          4                                owned by the United States of America;
                                                                          5                                thence, leaving the right-of-way of said
                                                                          6                                Route 7 and severing the land of said
                                                                          7                                United States of America and with the
                                                                          8                                House Parcel southeasterly 25 feet; thence,
                                                                          9                                northeast, running parallel to said Route 7
                                                                       10                                  right-of-way, approximately 994 feet to a
                                                                       11                                  point of deflection; thence northeasterly 368
                                                                       12                                  feet to a point beyond the existing fence cor-
                                                                       13                                  ner; thence, east 140 feet to the edge of the
                                                                       14                                  existing Willow Island access road; thence
                                                                       15                                  with said access road, northwesterly ap-
                                                                       16                                  proximately 62 feet to a point in the south-
                                                                       17                                  ern right-of-way of Ohio Route 7; thence
                                                                       18                                  with the right-of-way of said Route 7,
                                                                       19                                  southwesterly approximately 1,491 feet to
                                                                       20                                  the point of beginning, containing approxi-
                                                                       21                                  mately 1 acre.
                                                                       22                                  (B) EASEMENT.—The property referred to
                                                                       23                         in paragraph (2)(B) is the following: The tract
                                                                       24                         of land situated in the State of Ohio, Wash-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         ington County, on the Ohio River, and being


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00177   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              178
                                                                          1                       particularly bounded and described as follows:
                                                                          2                       Beginning at a point at the intersection of the
                                                                          3                       southern right-of-way of Ohio Route 7 and the
                                                                          4                       northeast side of the existing Willow Island ac-
                                                                          5                       cess road, a new corner to the land now or for-
                                                                          6                       merly owned by the United States of America;
                                                                          7                       thence, southwest, running with said Route 7
                                                                          8                       right-of-way, approximately 30 feet to a point on
                                                                          9                       the southwest side of the existing access road,
                                                                       10                         and corner to the road tract; thence with said ac-
                                                                       11                         cess road and the line of the road parcel, south-
                                                                       12                         easterly approximately 62 feet to a point; thence
                                                                       13                         leaving the road parcel and crossing the existing
                                                                       14                         access road northeasterly approximately 30 feet
                                                                       15                         to a point located on the northeast side of the ex-
                                                                       16                         isting access road; thence, northwesterly approxi-
                                                                       17                         mately 62 feet, to the point of beginning, con-
                                                                       18                         taining approximately 0.04 acre.
                                                                       19                         (4) DEED.—The Secretary shall convey the prop-
                                                                       20                erty under this subsection by quitclaim deed under
                                                                       21                such terms and conditions as the Secretary deter-
                                                                       22                mines appropriate to protect the interests of the
                                                                       23                United States.
                                                                       24                         (5) REVERSION.—If the Secretary determines



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                that the property conveyed under this subsection is


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00178   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              179
                                                                          1              not being used by the non-Federal entity for a public
                                                                          2              purpose, all right, title, and interest in and to the
                                                                          3              property shall revert, at the discretion of the Sec-
                                                                          4              retary, to the United States.
                                                                          5                       (6) REQUIREMENTS.—
                                                                          6                                (A) IMPROVEMENTS.—The Secretary shall
                                                                          7                       make such improvements and alterations to the
                                                                          8                       property described in paragraph (3)(A)(i) as the
                                                                          9                       Secretary, in consultation with the non-Federal
                                                                       10                         entity and relevant stakeholders, determines to be
                                                                       11                         appropriate to facilitate conveyance of the prop-
                                                                       12                         erty and provision of the easement under this
                                                                       13                         subsection, subject to the condition that the total
                                                                       14                         cost of those improvements and alterations un-
                                                                       15                         dertaken by the Secretary shall be not more than
                                                                       16                         $120,000.
                                                                       17                                  (B) ENVIRONMENTAL ASSESSMENT.—Before
                                                                       18                         making a conveyance under paragraph (2), the
                                                                       19                         Secretary shall—
                                                                       20                                          (i) conduct, with respect to the prop-
                                                                       21                                  erty to be conveyed, an assessment of the en-
                                                                       22                                  vironmental condition of the property, in-
                                                                       23                                  cluding an investigation of any potential
                                                                       24                                  hazardous,              toxic,        or     radioactive       waste



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  present on such property; and


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00179   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              180
                                                                          1                                        (ii) submit to the non-Federal entity a
                                                                          2                                report describing the results of such assess-
                                                                          3                                ment.
                                                                          4                                (C) REFUSAL BY NON-FEDERAL ENTITY.—
                                                                          5                                        (i) IN GENERAL.—Upon review by the
                                                                          6                                non-Federal entity of the report under sub-
                                                                          7                                paragraph (B), the non-Federal entity may
                                                                          8                                elect to refuse the conveyance under this
                                                                          9                                subsection.
                                                                       10                                          (ii) ELECTION.—An election under
                                                                       11                                  clause (i)—
                                                                       12                                                   (I) shall be at the sole discretion
                                                                       13                                          of the non-Federal entity; and
                                                                       14                                                   (II) shall be made by the non-Fed-
                                                                       15                                          eral entity by not later than the date
                                                                       16                                          that is 30 days after the date of sub-
                                                                       17                                          mission of the report under subpara-
                                                                       18                                          graph (B)(ii).
                                                                       19                                  (D) DREDGED MATERIAL PLACEMENT AC-
                                                                       20                         TIVITIES.—The Secretary shall—

                                                                       21                                          (i) notify and coordinate with the non-
                                                                       22                                  Federal entity and relevant stakeholders be-
                                                                       23                                  fore carrying out any dredged material
                                                                       24                                  placement activities associated with the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  property described in paragraph (3)(A)


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00180   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              181
                                                                          1                                after the date on which such property is
                                                                          2                                conveyed under this subsection; and
                                                                          3                                        (ii) in carrying out a dredged material
                                                                          4                                placement activity under clause (i), act in
                                                                          5                                accordance with Engineer Manual EM
                                                                          6                                1110–2–5025 (or a subsequent version of
                                                                          7                                that manual).
                                                                          8                       (7) RESERVATION OF RIGHTS.—The Secretary
                                                                          9              may reserve and retain from any conveyance under
                                                                       10                this subsection a right-of-way or any other right that
                                                                       11                the Secretary determines to be necessary for the oper-
                                                                       12                ation and maintenance of the authorized Federal
                                                                       13                channel along the Ohio River.
                                                                       14                         (8) TREATMENT.—Conveyance to the non-Fed-
                                                                       15                eral entity under this subsection of property described
                                                                       16                in paragraph (3)(A)(i) shall satisfy all obligations of
                                                                       17                the Secretary with respect to such property under—
                                                                       18                                  (A) section 306101 of title 54, United States
                                                                       19                         Code; and
                                                                       20                                  (B) section 306108 of title 54, United States
                                                                       21                         Code, with respect to the effects on the property
                                                                       22                         of dredged material placement activities carried
                                                                       23                         out by the Secretary after the date of the convey-
                                                                       24                         ances.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00181   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              182
                                                                          1                       (9) INAPPLICABILITY.—Subtitle I of title 40, and
                                                                          2              chapter 4 of title 41, United States Code shall not
                                                                          3              apply to any conveyance or easement provided under
                                                                          4              this subsection.
                                                                          5              (i) LEABURG FISH HATCHERY, LANE COUNTY, OR-
                                                                          6        EGON.—

                                                                          7                       (1) CONVEYANCE AUTHORIZED.—Subject to the
                                                                          8              provisions of this subsection, the Secretary shall con-
                                                                          9              vey, without consideration, to the State of Oregon,
                                                                       10                acting through the Oregon Department of Fish and
                                                                       11                Wildlife, all right, title, and interest of the United
                                                                       12                States in and to the real property comprising the
                                                                       13                Leaburg Fish Hatchery, consisting of approximately
                                                                       14                21.55 acres, identified as tracts Q–1500, Q–1501E,
                                                                       15                and 300E–1 and described in Department of the
                                                                       16                Army Lease No. DACW57–1–18–0009, together with
                                                                       17                any improvements on the property.
                                                                       18                         (2) WATER RIGHTS.—The Secretary may trans-
                                                                       19                fer to the State of Oregon, acting through the Oregon
                                                                       20                Department of Fish and Wildlife, any water rights
                                                                       21                held by the United States that are appurtenant to the
                                                                       22                property conveyed under this subsection.
                                                                       23                         (3) DEED.—The Secretary shall convey the prop-
                                                                       24                erty under this subsection by quitclaim deed under



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                such terms and conditions as the Secretary deter-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00182   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              183
                                                                          1              mines appropriate to protect the interests of the
                                                                          2              United States, including a condition that all of the
                                                                          3              property conveyed under this subsection be used and
                                                                          4              maintained by the State of Oregon for the purpose of
                                                                          5              operating a fish hatchery in perpetuity.
                                                                          6                       (4) REVERSION.—If the Secretary determines
                                                                          7              that the property conveyed under this subsection is
                                                                          8              not being used or maintained by the State of Oregon
                                                                          9              for the purpose of operating a fish hatchery in per-
                                                                       10                petuity, all or any portion of the property, including
                                                                       11                any water rights transferred under this subsection,
                                                                       12                shall, at the option of the Secretary, revert to the
                                                                       13                United States.
                                                                       14                         (5) SAVINGS CLAUSE.—If the State of Oregon
                                                                       15                does not accept the conveyance under this subsection,
                                                                       16                the Secretary may dispose of the property, including
                                                                       17                appurtenant water rights, under subchapter III of
                                                                       18                chapter 5 of title 40, United States Code.
                                                                       19                (j) WILLAMETTE FALLS LOCKS, WILLAMETTE RIVER,
                                                                       20 OREGON.—
                                                                       21                         (1) DEFINITIONS.—In this section:
                                                                       22                                  (A) REAL               ESTATE APPENDIX.—The                    term
                                                                       23                         ‘‘real estate appendix’’ means Appendix A of the
                                                                       24                         document published by the District Commander



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         of the Portland District of the Corps of Engi-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00183   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              184
                                                                          1                       neers, titled ‘‘Willamette Falls Locks Willamette
                                                                          2                       River Oregon Section 216 Disposition Study
                                                                          3                       with Integrated Environmental Assessment’’.
                                                                          4                                (B) RECEIVING ENTITY.—The term ‘‘receiv-
                                                                          5                       ing entity’’ means an entity identified by the
                                                                          6                       State of Oregon, in consultation with the Wil-
                                                                          7                       lamette Falls Locks Commission, to receive the
                                                                          8                       conveyance under paragraph (2).
                                                                          9                                (C) WILLAMETTE FALLS LOCKS PROJECT.—
                                                                       10                         The term ‘‘Willamette Falls Locks project’’
                                                                       11                         means the project for navigation, Willamette
                                                                       12                         Falls Locks, Willamette River, Oregon, author-
                                                                       13                         ized by the Act of June 25, 1910 (36 Stat. 664,
                                                                       14                         chapter 382).
                                                                       15                                  (D) WILLAMETTE FALLS LOCKS REPORT.—
                                                                       16                         The term ‘‘Willamette Falls Locks report’’ means
                                                                       17                         the memorandum of the Director of Civil Works
                                                                       18                         with the subject ‘‘Willamette Falls Locks (WFL),
                                                                       19                         Willamette River Oregon Section 216 Disposi-
                                                                       20                         tion Study with Integrated Environmental As-
                                                                       21                         sessment (Study)’’, dated July 11, 2019.
                                                                       22                         (2) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       23                is authorized to convey to the receiving entity, with-
                                                                       24                out consideration, all right, title, and interest of the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                United States in and to any land in which the Fed-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00184   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              185
                                                                          1              eral Government has a property interest for the Wil-
                                                                          2              lamette Falls Locks project, together with any im-
                                                                          3              provements on the land, subject to the requirements of
                                                                          4              this subsection and in accordance with the Willamette
                                                                          5              Falls Locks report.
                                                                          6                       (3) DEED.—The Secretary shall convey the prop-
                                                                          7              erty under this subsection by quitclaim deed under
                                                                          8              such terms and conditions as the Secretary deter-
                                                                          9              mines appropriate to protect the interests of the
                                                                       10                United States.
                                                                       11                         (4) SUBJECT                 TO       EXISTING            EASEMENTS      AND

                                                                       12                OTHER             INTERESTS.—The                     conveyance of property
                                                                       13                under paragraph (2) shall be subject to all existing
                                                                       14                deed reservations, easements, rights-of-way, and leases
                                                                       15                that are in effect as of the date of the conveyance.
                                                                       16                         (5) REVERSION.—If the Secretary determines
                                                                       17                that the property conveyed under this subsection cease
                                                                       18                to be held in public ownership, all right, title, and in-
                                                                       19                terest in and to the property shall revert, at the dis-
                                                                       20                cretion of the Secretary, to the United States.
                                                                       21                         (6) REQUIREMENTS BEFORE CONVEYANCE.—
                                                                       22                                  (A) PERPETUAL ROAD EASEMENT.—Before
                                                                       23                         making the conveyance under paragraph (2), the
                                                                       24                         Secretary shall acquire a perpetual road ease-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         ment from an adjacent property owner for use of


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00185   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              186
                                                                          1                       an access road, which easement shall convey with
                                                                          2                       the property conveyed under such paragraph.
                                                                          3                                (B) ENVIRONMENTAL COMPLIANCE.—Before
                                                                          4                       making the conveyance under paragraph (2), in
                                                                          5                       accordance with the real estate appendix, the
                                                                          6                       Secretary shall complete a Phase 1 Environ-
                                                                          7                       mental Site Assessment pursuant to the Com-
                                                                          8                       prehensive Environmental Response, Compensa-
                                                                          9                       tion, and Liability Act of 1980 (42 U.S.C. 9601
                                                                       10                         et seq.).
                                                                       11                                  (C) HISTORIC                  PRESERVATION.—The                Sec-
                                                                       12                         retary may enter into a memorandum of agree-
                                                                       13                         ment with the Oregon State Historic Preserva-
                                                                       14                         tion Office and the Advisory Council on Historic
                                                                       15                         Preservation that identifies actions the Secretary
                                                                       16                         shall take before making the conveyance under
                                                                       17                         paragraph (2).
                                                                       18                                  (D) REPAIRS.—Before making the convey-
                                                                       19                         ance under paragraph (2), the Secretary shall
                                                                       20                         carry out repairs to address primary seismic
                                                                       21                         and safety risks in accordance with the rec-
                                                                       22                         ommendations approved in the Willamette Falls
                                                                       23                         Locks report.
                                                                       24                         (7) DEAUTHORIZATION.—Beginning on the date



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                on which the Secretary makes the conveyance under


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00186   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               187
                                                                          1               paragraph (2), the Willamette Falls Locks project is
                                                                          2               no longer authorized.
                                                                          3        SEC. 333. REPEALS.

                                                                          4               (a) Section 1001 of the Water Resources Development
                                                                          5 Act of 1986 (33 U.S.C. 579a) is amended—
                                                                          6                        (1) in subsection (b), by striking paragraph (2)
                                                                          7               and redesignating paragraph (3) as paragraph (2);
                                                                          8               and
                                                                          9                        (2) by striking subsection (c).
                                                                       10                 (b) Section 6003 of the Water Resources Reform and
                                                                       11 Development Act of 2014 (33 U.S.C. 579c) (and the item
                                                                       12 relating to such section in the table of contents) are re-
                                                                       13 pealed.
                                                                       14                 (c) Section 1301 of the Water Resources Development
                                                                       15 Act of 2016 (33 U.S.C. 579d) (and the item relating to such
                                                                       16 section in the table of contents) are repealed.
                                                                       17                 (d) Section 1302 of the Water Resources Development
                                                                       18 Act of 2016 (33 U.S.C. 579c–1) (and the item relating to
                                                                       19 such section in the table of contents) are repealed.
                                                                       20                 (e) Section 1301 of the Water Resources Development
                                                                       21 Act of 2018 (33 U.S.C. 579d–1) (and the item relating to
                                                                       22 such section in the table of contents) are repealed.
                                                                       23                 (f) Section 1302 of the Water Resources Development
                                                                       24 Act of 2018 (33 U.S.C. 579c–2) (and the item relating to



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 such section in the table of contents) are repealed.


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00187   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               188
                                                                          1           TITLE IV—WATER RESOURCES
                                                                          2                INFRASTRUCTURE
                                                                          3        SEC. 401. PROJECT AUTHORIZATIONS.

                                                                          4               The following projects for water resources development
                                                                          5 and conservation and other purposes, as identified in the
                                                                          6 reports titled ‘‘Report to Congress on Future Water Re-
                                                                          7 sources Development’’ submitted to Congress pursuant to
                                                                          8 section 7001 of the Water Resources Reform and Develop-
                                                                          9 ment Act of 2014 (33 U.S.C. 2282d) or otherwise reviewed
                                                                       10 by Congress, are authorized to be carried out by the Sec-
                                                                       11 retary substantially in accordance with the plans, and sub-
                                                                       12 ject to the conditions, described in the respective reports or
                                                                       13 decision documents designated in this section:
                                                                       14                          (1) NAVIGATION.—

                                                                                                                                 C.
                                                                                                                               Date of                            D.
                                                                                      A.                     B.               Report of                       Estimated
                                                                                     State                  Name               Chief of                         Costs
                                                                                                                              Engineers

                                                                                   1. AK           Port of Nome               May 29,              Federal: $368,173,000
                                                                                                     Modifications             2020                Non-Federal: $122,746,000
                                                                                                                                                   Total: $490,919,000

                                                                                   2. AK           Unalaska (Dutch            February 7,          Federal: $26,202,750
                                                                                                     Harbor) Chan-              2020               Non-Federal: $8,734,250
                                                                                                     nels                                          Total: $34,937,000

                                                                                   3. CT           New Haven Har-             May 7, 2020          Federal: $53,489,000
                                                                                                     bor Navigation                                Non-Federal: $18,822,000
                                                                                                     Improvement                                   Total: $72,311,000
                                                                                                     Project

                                                                                   4. NY,          New York and               April 23,            Federal: $18,940,000




kjohnson on DSK79L0C42PROD with BILLS
                                                                                      NJ             New Jersey                 2020               Non-Federal: $6,310,000
                                                                                                     Harbor Anchor-                                Total: $25,250,000
                                                                                                     ages


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00188   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              189
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   5. TX          Gulf Intracoastal          October 23,          Total: $409,777,000, to be de-
                                                                                                    Waterway,                  2019                 rived 1⁄2 from the general
                                                                                                    Brazos River                                    fund of the Treasury and
                                                                                                    Floodgates and                                  1⁄2 from the Inland Water-

                                                                                                    Colorado River                                  ways Trust Fund.
                                                                                                    Locks

                                                                                   6. TX          Houston Ship               April 23,            Federal: $462,803,000
                                                                                                   Channel Expan-              2020               Non-Federal: $414,045,000
                                                                                                   sion Channel                                   Total: $876,848,000
                                                                                                   Improvement
                                                                                                   Project, Harris,
                                                                                                   Chambers, and
                                                                                                   Galveston Coun-
                                                                                                   ties

                                                                                   7. TX          Matagorda Ship             November 15,         Federal: $138,660,000
                                                                                                   Channel Im-                 2019               Non-Federal: $79,664,000
                                                                                                   provement                                      Total: $218,324,000
                                                                                                   Project, Port
                                                                                                   Lavaca


                                                                          1                       (2) FLOOD RISK MANAGEMENT.—

                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   1. AZ          Little Colorado            December 14,         Federal: $52,462,000
                                                                                                    River at Wins-             2018               Non-Federal: $28,249,000
                                                                                                    low, Navajo                                   Total: $80,711,000
                                                                                                    County

                                                                                   2. CA          Westminster, East          July 9, 2020         Federal: $314,506,000
                                                                                                   Garden Grove,                                  Non-Federal: $910,092,000
                                                                                                   California Flood                               Total: $1,224,598,000
                                                                                                   Risk Manage-
                                                                                                   ment




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00189   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              190
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   3. CT,         Westchester Coun-          May 7, 2020          Federal: $14,702,500
                                                                                      NY           ty Streams,                                    Non-Federal: $14,702,500
                                                                                                   Byram River                                    Total: $29,405,000
                                                                                                   Basin, Fairfield
                                                                                                   County, Con-
                                                                                                   necticut, and
                                                                                                   Westchester
                                                                                                   County, New
                                                                                                   York

                                                                                   4. ND          Souris River               April 16,            Federal: $58,041,750
                                                                                                    Basin Flood                2019               Non-Federal: $31,253,250
                                                                                                    Risk Manage-                                  Total: $89,295,000
                                                                                                    ment

                                                                                   5. NJ          Peckman River              April 29,            Federal: $95,022,000
                                                                                                    Basin                      2020               Non-Federal: $51,166,000
                                                                                                                                                  Total: $146,188,000

                                                                                   6. NM          Middle Rio                 March 13,            Federal: $190,538,000
                                                                                                    Grande Flood              2020                Non-Federal: $102,598,000
                                                                                                    Protection,                                   Total: $293,136,000
                                                                                                    Bernalillo to
                                                                                                    Belen

                                                                                   7. OK          Tulsa and West-            April 23,            Federal: $86,780,000
                                                                                                    Tulsa Levee                2020               Non-Federal: $46,728,000
                                                                                                    System, Tulsa                                 Total: $133,508,000
                                                                                                    County


                                                                          1                       (3) HURRICANE AND STORM DAMAGE RISK RE-
                                                                          2              DUCTION.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00190   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              191
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   1. DE          Delaware Bene-             March 6,             Initial Federal: $53,220,000
                                                                                                    ficial Use of             2020                Initial Non-Federal:
                                                                                                    Dredged Mate-                                   $28,660,000
                                                                                                    rial for the                                  Total: $81,880,000
                                                                                                    Delaware River                                Renourishment Federal:
                                                                                                                                                    $116,380,000
                                                                                                                                                  Renourishment Non-Federal:
                                                                                                                                                    $116,380,000
                                                                                                                                                  Renourishment Total:
                                                                                                                                                    $232,760,000

                                                                                   2. NJ          New Jersey Bene-           April 8,             Initial Federal: $80,780,000
                                                                                                    ficial Use of              2020               Initial Non-Federal:
                                                                                                    Dredged Mate-                                   $43,500,000
                                                                                                    rial for the                                  Total: $124,280,000
                                                                                                    Delaware River                                Renourishment Federal:
                                                                                                                                                    $82,140,000
                                                                                                                                                  Renourishment Non-Federal:
                                                                                                                                                    $82,140,000
                                                                                                                                                  Renourishment Total:
                                                                                                                                                    $164,280,000

                                                                                   3. NJ          Rahway River               June 9, 2020         Federal: $46,754,000
                                                                                                    Basin, New Jer-                               Non-Federal: $25,175,000
                                                                                                    sey Coastal                                   Total: $71,929,000
                                                                                                    Storm Risk
                                                                                                    Management

                                                                                   4. NY          East Rockaway              August 22,           Initial Federal: $604,203,000
                                                                                                    Inlet to Rock-             2019               Initial Non-Federal: $0
                                                                                                    away Inlet and                                Total: $604,203,000
                                                                                                    Jamaica Bay,                                  Renourishment Federal:
                                                                                                    Atlantic Coast                                  $189,763,000
                                                                                                    of New York                                   Renourishment Non-Federal:
                                                                                                                                                    $189,763,000
                                                                                                                                                  Renourishment Total:
                                                                                                                                                    $379,526,000

                                                                                   5. NY          Hashamomuck                December 9,          Initial Federal: $11,549,000
                                                                                                   Cove Coastal                2019               Initial Non-Federal:
                                                                                                   Storm Risk                                       $6,218,000
                                                                                                   Management                                     Total: $17,767,000
                                                                                                                                                  Renourishment Federal:
                                                                                                                                                    $23,481,500
                                                                                                                                                  Renourishment Non-Federal:




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                                                                    $23,481,500
                                                                                                                                                  Renourishment Total:
                                                                                                                                                    $46,963,000



                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00191   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              192
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   6. RI          Pawcatuck River            December 19,         Federal: $37,848,000
                                                                                                    Coastal Storm              2018               Non-Federal: $20,379,000
                                                                                                    Risk Manage-                                  Total: $58,227,000
                                                                                                    ment Project

                                                                                   7. VA          Norfolk Coastal            February 5,          Federal: $909,040,000
                                                                                                    Storm Risk                 2019               Non-Federal: $489,480,000
                                                                                                    Management                                    Total: $1,398,520,000


                                                                          1                       (4) FLOOD RISK MANAGEMENT AND ECOSYSTEM
                                                                          2                RESTORATION.—


                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   1. CO          South Platte River         July 29,             Federal: $334,412,000
                                                                                                    and Tributaries,           2019               Non-Federal: $200,406,000
                                                                                                    Adams and                                     Total: $534,818,000
                                                                                                    Denver Counties

                                                                                   2. NY          Fire Island Inlet          July 9, 2020         Initial Federal:
                                                                                                    to Montauk                                      $1,541,981,000
                                                                                                    Point, New York                               Initial Non-Federal: $0
                                                                                                    Reformulation                                 Total: $1,541,981,000
                                                                                                                                                  Renourishment Federal:
                                                                                                                                                    $742,926,500
                                                                                                                                                  Renourishment Non-Federal:
                                                                                                                                                    $742,926,500
                                                                                                                                                  Renourishment Total:
                                                                                                                                                    $1,485,853,000


                                                                          3                       (5) ECOSYSTEM RESTORATION.—

                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   1. CA          Delta Islands and          December 18,         Federal: $16,746,395
                                                                                                    Levees                     2018               Non-Federal: $9,016,736
                                                                                                                                                  Total: $25,763,131


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00192   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              193
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   2. CA          Yuba River Eco-            June 20,             Federal: $65,014,326
                                                                                                    system Restora-            2019               Non-Federal: $35,008,268
                                                                                                    tion                                          Total: $100,022,594

                                                                                   3. FL          Comprehensive Ev-          April 8,             Federal: $372,232,000
                                                                                                    erglades Res-              2020               Non-Federal: $368,528,000
                                                                                                    toration Plan,                                Total: $740,760,000
                                                                                                    Loxahatchee
                                                                                                    River Watershed
                                                                                                    Restoration
                                                                                                    Project, Martin
                                                                                                    and Palm Beach
                                                                                                    Counties

                                                                                   4. IL          The Great Lakes            May 23,              Federal: $690,643,200
                                                                                                    and Mississippi           2019                Non-Federal: $172,660,800
                                                                                                    River Interbasin                              Total: $863,304,000
                                                                                                    Study - Bran-
                                                                                                    don Road, Will
                                                                                                    County

                                                                                   5. IL          South Fork of the          July 9, 2020         Federal: $11,657,000
                                                                                                    South Branch of                               Non-Federal: $6,277,000
                                                                                                    the Chicago                                   Total: $17,934,000
                                                                                                    River, Bubbly
                                                                                                    Creek, Eco-
                                                                                                    system Restora-
                                                                                                    tion

                                                                                   6. MD          Anacostia Water-           December 19,         Federal: $23,171,000
                                                                                                    shed Restora-              2018               Non-Federal: $12,476,000
                                                                                                    tion, Prince                                  Total: $35,647,000
                                                                                                    George’s County

                                                                                   7. MO          St. Louis                  November 1,          Federal: $60,124,000
                                                                                                    Riverfront-                2019               Non-Federal: $32,375,000
                                                                                                    Meramec River                                 Total: $92,499,000
                                                                                                    Basin Eco-
                                                                                                    system Restora-
                                                                                                    tion




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00193   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              194
                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   8. NM          Rio Grande, Envi-          August 5,            Federal: $16,163,000
                                                                                                    ronmental Man-             2019               Non-Federal: $8,703,000
                                                                                                    agement Pro-                                  Total: $24,866,000
                                                                                                    gram, Sandia
                                                                                                    Pueblo to Isleta
                                                                                                    Pueblo, New
                                                                                                    Mexico Eco-
                                                                                                    system Restora-
                                                                                                    tion

                                                                                   9. NY,         Hudson-Raritan             May 26,              Federal: $265,320,000
                                                                                      NJ           Estuary Eco-               2020                Non-Federal: $142,864,000
                                                                                                   system Restora-                                Total: $408,184,000
                                                                                                   tion

                                                                                   10. TX         Jefferson County           September            Federal: $37,615,000
                                                                                                    Ecosystem Res-             12, 2019           Non-Federal: $20,254,000
                                                                                                    toration                                      Total: $57,869,000


                                                                          1                       (6) WATER SUPPLY.—

                                                                                                                                C.
                                                                                                                              Date of                            D.
                                                                                     A.                     B.               Report of                       Estimated
                                                                                    State                  Name               Chief of                         Costs
                                                                                                                             Engineers

                                                                                   1. OR          Willamette River           December 18,         Federal: $0
                                                                                                    Basin Review               2019               Non-Federal: $0
                                                                                                    Reallocation,                                 Total: $0


                                                                          2                       (7) MODIFICATIONS AND OTHER PROJECTS.—

                                                                                                                                C.                               D.
                                                                                     A.                     B.                Date of                        Estimated
                                                                                    State                  Name              Decision                          Costs
                                                                                                                             Document

                                                                                   1. KY          Kentucky Lock              June 9, 2020         Total: $1,152,769,000 (to be
                                                                                                                                                    derived 1⁄2 from the general
                                                                                                                                                    fund of the Treasury and
                                                                                                                                                    1⁄2 from the Inland Water-




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                                                                    ways Trust Fund)




                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00194   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               195
                                                                                                                                 C.                               D.
                                                                                      A.                     B.                Date of                        Estimated
                                                                                     State                  Name              Decision                          Costs
                                                                                                                              Document

                                                                                    2. NC          Carolina Beach             June 16,             Federal: $24,205,000
                                                                                                     Integrated                 2020               Non-Federal: $24,205,000
                                                                                                     Beach Re-                                     Total: $48,410,000
                                                                                                     nourishment

                                                                                    3. NC          Wrightsville Beach         July 2, 2020         Federal: $53,788,000
                                                                                                                                                   Non-Federal: $22,329,000
                                                                                                                                                   Total: $76,117,000
                                                                                                                                                   Renourishment Federal:
                                                                                                                                                     $14,553,000
                                                                                                                                                   Renourishment Non-Federal:
                                                                                                                                                     $14,553,000
                                                                                                                                                   Renourishment Total:
                                                                                                                                                     $29,106,000

                                                                                    4. TX          Corpus Christi             May 4, 2020          Federal: $403,000,000
                                                                                                     Ship Channel,                                 Non-Federal: $273,010,000
                                                                                                     Deepening and                                 Total: $676,010,000
                                                                                                     Widening and
                                                                                                     Barge Shelves


                                                                          1        SEC. 402. SPECIAL RULES.

                                                                          2               (a)        GREAT              LAKES           AND          MISSISSIPPI           RIVER
                                                                          3 INTERBASIN PROJECT, BRANDON ROAD, WILL COUNTY, IL-
                                                                          4        LINOIS.—The Secretary shall carry out the project for eco-

                                                                          5 system restoration, Great Lakes and Mississippi River
                                                                          6 Interbasin project, Brandon Road, Will County, Illinois,
                                                                          7 authorized by section 401 of this Act, substantially in ac-
                                                                          8 cordance with the terms and conditions described in the Re-
                                                                          9 port of the Chief of Engineers, dated May 23, 2019, with
                                                                       10 the following modifications:
                                                                       11                          (1) The Federal share of the cost of construction




kjohnson on DSK79L0C42PROD with BILLS
                                                                       12                 shall be 80 percent.



                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00195   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               196
                                                                          1                        (2) The Secretary may include the addition or
                                                                          2               substitution of technologies or measures not described
                                                                          3               in the report, as the Secretary determines to be advis-
                                                                          4               able.
                                                                          5               (b) WILLAMETTE RIVER BASIN REVIEW REALLOCA-
                                                                          6        TION STUDY.—The Secretary shall carry out the project for

                                                                          7 water supply, Willamette River Basin Review Reallocation,
                                                                          8 Oregon, authorized by section 401 of this Act, substantially
                                                                          9 in accordance with the terms and conditions described in
                                                                       10 the Report of the Chief of Engineers, dated December 18,
                                                                       11 2019, with the following modifications:
                                                                       12                          (1) The Secretary shall meet the obligations of
                                                                       13                 the Corps of Engineers under the Endangered Species
                                                                       14                 Act of 1973 by complying with the June 2019 NMFS
                                                                       15                 Willamette Basin Review Study Biological Opinion
                                                                       16                 Reasonable and Prudent Alternative until such time,
                                                                       17                 if any, as it is modified or replaced, in whole or in
                                                                       18                 part, through the consultation process under section
                                                                       19                 7(a) of the Endangered Species Act of 1973.
                                                                       20                          (2) The Secretary may reallocate not more than
                                                                       21                 10 percent of overall storage in the joint conservation
                                                                       22                 pool, as authorized by this Act and without further
                                                                       23                 congressional action, if such reallocation is consistent
                                                                       24                 with the ongoing consultation under section 7(a) of



kjohnson on DSK79L0C42PROD with BILLS
                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00196   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                               197
                                                                          1               the Endangered Species Act of 1973 related to Wil-
                                                                          2               lamette Valley System operations.
                                                                          3                        (3) The Secretary shall ensure that the revised
                                                                          4               reallocation is not reallocated from a single storage
                                                                          5               use, does not seriously affect authorized project pur-
                                                                          6               poses, and does not otherwise involve major oper-
                                                                          7               ational changes to the project.
                                                                          8               (c) CANO MARTIN PENA, SAN JUAN, PUERTO RICO.—
                                                                          9 Section 5127 of the Water Resources Development Act of
                                                                       10 2007                   (121        Stat.       1242)          is       amended            by     striking
                                                                       11 ‘‘$150,000,000’’ and inserting ‘‘$232,430,000’’.
                                                                       12          SEC. 403. AUTHORIZATION OF PROJECTS BASED ON FEASI-

                                                                       13                                   BILITY STUDIES PREPARED BY NON-FEDERAL

                                                                       14                                   INTERESTS.

                                                                       15                 (a) IN GENERAL.—The Secretary is authorized to
                                                                       16 carry out the following projects for water resources develop-
                                                                       17 ment and conservation and other purposes, subject to sub-
                                                                       18 section (b):
                                                                       19                          (1) FORT PIERCE, ST. LUCIE COUNTY, FLOR-
                                                                       20                 IDA.—The             project for hurricane and storm damage
                                                                       21                 reduction, Fort Pierce, St. Lucie County, Florida, as
                                                                       22                 described in the review assessment of the Secretary, ti-
                                                                       23                 tled ‘‘Review Assessment of St. Lucie County, Florida
                                                                       24                 Fort Pierce Shore Protection Project Section 203 Inte-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                 grated Feasibility Study and Environmental Assess-


                                                                                     •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020    Jkt 099200   PO 00000   Frm 00197   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              198
                                                                          1              ment (June 2018)’’ and dated July 2018, at a total
                                                                          2              cost of $33,107,639, and at an estimated total cost of
                                                                          3              $97,958,972 for periodic nourishment over the 50-year
                                                                          4              life of the project.
                                                                          5                       (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—
                                                                          6              The project for navigation, Baptiste Collette Bayou,
                                                                          7              Louisiana, as described in the review assessment of
                                                                          8              the        Secretary,             titled         ‘‘Review            Assessment       of
                                                                          9              Plaquemines Parish Government’s Section 203 Study
                                                                       10                Baptiste Collette Bayou Navigation Channel Deep-
                                                                       11                ening Project Integrated Feasibility Study and Envi-
                                                                       12                ronmental Assessment (January 2017, Amended April
                                                                       13                2018)’’ and dated June 2018, at a total cost of
                                                                       14                $44,920,000.
                                                                       15                         (3) HOUMA NAVIGATION CANAL, LOUISIANA.—
                                                                       16                The project for navigation, Houma Navigation Canal,
                                                                       17                Louisiana, as described in the review assessment of
                                                                       18                the Secretary, titled ‘‘Review Assessment of Houma
                                                                       19                Navigation Canal Deepening Project Section 203 In-
                                                                       20                tegrated Feasibility Report and DRAFT Environ-
                                                                       21                mental Impact Statement (June 2018)’’ and dated
                                                                       22                July 2018, at a total cost of $253,458,000.
                                                                       23                         (4) CHACON                CREEK, TEXAS.—The                         project for
                                                                       24                flood risk management, ecosystem restoration, and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                other purposes, Chacon Creek, Texas, as described in


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00198   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              199
                                                                          1              the review assessment of the Secretary, titled ‘‘Review
                                                                          2              Assessment of Chacon Creek, Texas Section 203 Inte-
                                                                          3              grated Feasibility Report and DRAFT Environ-
                                                                          4              mental Assessment (August 2018)’’ and dated Sep-
                                                                          5              tember 2018, at a total cost of $51,973,000.
                                                                          6              (b) REQUIREMENTS.—The Secretary may only carry
                                                                          7 out a project authorized under subsection (a)—
                                                                          8                       (1) substantially in accordance with the applica-
                                                                          9              ble review assessment for the project submitted by the
                                                                       10                Secretary under section 203(c) of the Water Resources
                                                                       11                Development Act of 1986, as identified in subsection
                                                                       12                (a) of this section, and subject to such modifications
                                                                       13                or conditions as the Secretary considers appropriate
                                                                       14                and identifies in a final assessment that addresses the
                                                                       15                concerns, recommendations, and conditions identified
                                                                       16                by the Secretary in the applicable review assessment;
                                                                       17                and
                                                                       18                         (2) after the Secretary transmits to the Com-
                                                                       19                mittee on Transportation and Infrastructure of the
                                                                       20                House of Representatives and the Committee on Envi-
                                                                       21                ronment and Public Works of the Senate such final
                                                                       22                assessment.
                                                                       23                (c) TECHNICAL CORRECTION.—Section 203(c)(1) of the
                                                                       24 Water Resources Development Act of 1986 (33 U.S.C.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 2231(c)(1)) is amended, in the matter preceding subpara-


                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00199   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                                                                                                                              200
                                                                          1 graph (A), by striking ‘‘a report’’ and inserting ‘‘an assess-
                                                                          2 ment’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    •HR 7575 RH

                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00200   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
kjohnson on DSK79L0C42PROD with BILLS



                                        VerDate Sep 11 2014   22:18 Jul 24, 2020   Jkt 099200   PO 00000   Frm 00201   Fmt 6652   Sfmt 6203   E:\BILLS\H7575.RH   H7575
                     Union Calendar No. 369
116TH CONGRESS
   2D SESSION       H. R. 7575
          [Report No. 116–460, Part I]
                                                                                         H7575
                  A BILL
                                                                                         E:\BILLS\H7575.RH


To provide for improvements to the rivers and har-
  bors of the United States, to provide for the con-
  servation and development of water and related
  resources, and for other purposes.
                   JULY 24, 2020                                                         Sfmt 6651
  Reported from the Committee on Transportation and
                                                                                         Fmt 6651

          Infrastructure with an amendment
                   JULY 24, 2020
Committee on the Budget discharged; committed to the
                                                                                         Frm 00202
  Committee of the Whole House on the State of the
  Union and ordered to be printed
                                                                                         PO 00000
                                                                                         Jkt 099200
                                                                                         22:18 Jul 24, 2020
                                                                                         VerDate Sep 11 2014
                                                       kjohnson on DSK79L0C42PROD with BILLS


File and source

File
BILLS_bills-116hr7575rh_bills-116hr7575rh.pdf
Size
564,118 bytes
SHA-256
938013e0c69cb1393f916eac5730ccaaff84208c7c9623a2909dc93cc42a1250
Our copy
BILLS_bills-116hr7575rh_bills-116hr7575rh.pdf
Original
www.govinfo.gov
Back to top