Pandemic Darlings The pandemic economy, in original documents
Home Source documents H.R. 7575, Water Resources Development Act (July 30, 2020)

H.R. 7575, Water Resources Development Act (July 30, 2020)

Summary

House bill 7575 of the 116th Congress, 2D Session, is the Water Resources Development Act of 2020, an Act to provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, and for other purposes. It records that it was received in the Senate on July 30, 2020 and passed the House of Representatives on July 29, 2020, with an attestation by Cheryl L. Johnson, Clerk, and Gloria J. Lett, Deputy Clerk. Title I, General Provisions, in its table of contents lists budgetary treatment of the Harbor Maintenance Trust Fund, funding for navigation, inland waterway projects, small flood control projects, and resiliency planning assistance.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Bills Bills 116Hr7575Rds Bills 116Hr7575Rds
Case
Bills Bills 116Hr7575Rds Bills 116Hr7575Rds

Cite this document

“H.R. 7575, Water Resources Development Act (July 30, 2020).” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/bills-bills-116hr7575rds-bills-116hr7575rds/, SHA-256 b68e51e8faca3535e6441e9beacf5e03739ecdff2df8be773c3c217a96cf1454.

Full text

                                                                                                                                                                           II




                                                                       116TH CONGRESS
                                                                          2D SESSION
                                                                                                             H. R. 7575

                                                                                   IN THE SENATE OF THE UNITED STATES
                                                                                                                       JULY 30, 2020
                                                                                                                         Received




                                                                                                               AN ACT
                                                                       To provide for improvements to the rivers and harbors of
                                                                          the United States, to provide for the conservation and
                                                                          development of water and related resources, and for
                                                                          other purposes.

                                                                         1              Be it enacted by the Senate and House of Representa-
                                                                         2 tives of the United States of America in Congress assembled,




kjohnson on DSK79L0C42PROD with BILLS



                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00001   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  2
                                                                         1     SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

                                                                         2              (a) SHORT TITLE.—This Act may be cited as the
                                                                         3 ‘‘Water Resources Development Act of 2020’’.
                                                                         4              (b) TABLE OF CONTENTS.—The table of contents for
                                                                         5 this Act is as follows:
                                                                               Sec. 1. Short title; table of contents.
                                                                               Sec. 2. Secretary defined.

                                                                                                           TITLE I—GENERAL PROVISIONS

                                                                               Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Main-
                                                                                                tenance Trust Fund.
                                                                               Sec. 102. Funding for navigation.
                                                                               Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund.
                                                                               Sec. 104. Additional measures at donor ports and energy transfer ports.
                                                                               Sec. 105. Assumption of maintenance of a locally preferred plan.
                                                                               Sec. 106. Coast Guard anchorages.
                                                                               Sec. 107. State contribution of funds for certain operation and maintenance
                                                                                                costs.
                                                                               Sec. 108. Inland waterway projects.
                                                                               Sec. 109. Implementation of water resources principles and requirements.
                                                                               Sec. 110. Resiliency planning assistance.
                                                                               Sec. 111. Project consultation.
                                                                               Sec. 112. Review of resiliency assessments.
                                                                               Sec. 113. Small flood control projects.
                                                                               Sec. 114. Conforming amendment.
                                                                               Sec. 115. Feasibility studies; review of natural and nature-based features.
                                                                               Sec. 116. Report on corrosion prevention activities.
                                                                               Sec. 117. Quantification of benefits for flood risk management projects in seis-
                                                                                                mic zones.
                                                                               Sec. 118. Federal interest determination.
                                                                               Sec. 119. Economically disadvantaged community flood protection and hurri-
                                                                                                cane and storm damage reduction study pilot program.
                                                                               Sec. 120. Permanent measures to reduce emergency flood fighting needs for
                                                                                                communities subject to repetitive flooding.
                                                                               Sec. 121. Emergency response to natural disasters.
                                                                               Sec. 122. Study on natural infrastructure at Corps of Engineers projects.
                                                                               Sec. 123. Review of Corps of Engineers assets.
                                                                               Sec. 124. Sense of Congress on multipurpose projects.
                                                                               Sec. 125. Beneficial reuse of dredged material; dredged material management
                                                                                                plans.
                                                                               Sec. 126. Aquatic ecosystem restoration for anadromous fish.
                                                                               Sec. 127. Annual report to Congress.
                                                                               Sec. 128. Harmful algal bloom demonstration program.
                                                                               Sec. 129. Update on Invasive Species Policy Guidance.
                                                                               Sec. 130. Report on debris removal.




kjohnson on DSK79L0C42PROD with BILLS
                                                                               Sec. 131. Missouri River interception-rearing complex construction.
                                                                               Sec. 132. Cost and benefit feasibility assessment.
                                                                               Sec. 133. Materials, services, and funds for repair, restoration, or rehabilitation
                                                                                                of projects.

                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00002   Fmt 6652   Sfmt 6211   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  3
                                                                               Sec. 134. Levee safety.
                                                                               Sec. 135. National Dam Safety Program.
                                                                               Sec. 136. Rehabilitation of Corps of Engineers constructed pump stations.
                                                                               Sec. 137. Non-Federal Project Implementation Pilot Program.
                                                                               Sec. 138. Definition of economically disadvantaged community.
                                                                               Sec. 139. Cost sharing provisions for territories and Indian Tribes.
                                                                               Sec. 140. Flood control and other purposes.
                                                                               Sec. 141. Review of contracting policies.
                                                                               Sec. 142. Buy America.
                                                                               Sec. 143. Annual report on status of feasibility studies.

                                                                                                           TITLE II—STUDIES AND REPORTS

                                                                               Sec. 201. Authorization of proposed feasibility studies.
                                                                               Sec. 202. Expedited completions.
                                                                               Sec. 203. Feasibility study modifications.
                                                                               Sec. 204. Selma, Alabama.
                                                                               Sec. 205. Comprehensive study of the Sacramento River, Yolo Bypass, Cali-
                                                                                               fornia.
                                                                               Sec. 206. Lake Okeechobee regulation schedule, Florida.
                                                                               Sec. 207. Great Lakes Coastal Resiliency Study.
                                                                               Sec. 208. Rathbun Lake, Chariton River, Iowa.
                                                                               Sec. 209. Report on the status of restoration in the Louisiana coastal area.
                                                                               Sec. 210. Lower Mississippi River comprehensive study.
                                                                               Sec. 211. Upper Mississippi River Comprehensive Plan.
                                                                               Sec. 212. Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kan-
                                                                                               sas, Nebraska, and Missouri.
                                                                               Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Harbor, New
                                                                                               Hampshire.
                                                                               Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Oregon.
                                                                               Sec. 215. Port Orford, Oregon.
                                                                               Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas.
                                                                               Sec. 217. GAO study on mitigation for water resources development projects.
                                                                               Sec. 218. GAO study on application of Harbor Maintenance Trust Fund ex-
                                                                                               penditures.
                                                                               Sec. 219. GAO study on administration of environmental banks.
                                                                               Sec. 220. Study on Corps of Engineers concessionaire agreements.
                                                                               Sec. 221. Study on water supply and water conservation at water resources de-
                                                                                               velopment projects.
                                                                               Sec. 222. PFAS review and inventory at Corps facilities.
                                                                               Sec. 223. Report on recreational facilities.

                                                                                          TITLE III—DEAUTHORIZATIONS AND MODIFICATIONS

                                                                               Sec. 301. Deauthorization of inactive projects.
                                                                               Sec. 302. Abandoned and inactive noncoal mine restoration.
                                                                               Sec. 303. Tribal partnership program.
                                                                               Sec. 304. Lakes program.
                                                                               Sec. 305. Watercraft inspection stations.
                                                                               Sec. 306. Rehabilitation of Corps of Engineers constructed dams.
                                                                               Sec. 307. Chesapeake Bay Environmental Restoration and Protection Program.
                                                                               Sec. 308. Upper Mississippi River System Environmental Management Pro-




kjohnson on DSK79L0C42PROD with BILLS
                                                                                               gram.
                                                                               Sec. 309. McClellan-Kerr Arkansas River Navigation System.
                                                                               Sec. 310. Ouachita-Black River Navigation Project, Arkansas.
                                                                               Sec. 311. Sacramento River, Glenn-Colusa, California.

                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00003   Fmt 6652   Sfmt 6211   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  4
                                                                               Sec. 312. Lake Isabella, California.
                                                                               Sec. 313. Lower San Joaquin River flood control project.
                                                                               Sec. 314. San Diego River and Mission Bay, San Diego County, California.
                                                                               Sec. 315. San Francisco, California, Waterfront Area.
                                                                               Sec. 316. Western Pacific Interceptor Canal, Sacramento River, California.
                                                                               Sec. 317. Rio Grande Environmental Management Program, Colorado, New
                                                                                               Mexico, and Texas.
                                                                               Sec. 318. New London Harbor Waterfront Channel, Connecticut.
                                                                               Sec. 319. Washington Harbor, District of Columbia.
                                                                               Sec. 320. Big Cypress Seminole Indian Reservation Water Conservation Plan,
                                                                                               Florida.
                                                                               Sec. 321. Central Everglades, Florida.
                                                                               Sec. 322. Miami River, Florida.
                                                                               Sec. 323. Julian Keen, Jr. Lock and Dam, Moore Haven, Florida.
                                                                               Sec. 324. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St. Johns
                                                                                               River Basin, Florida.
                                                                               Sec. 325. Calcasieu River and Pass, Louisiana.
                                                                               Sec. 326. San Juan-Chama project; Abiquiu Dam, New Mexico.
                                                                               Sec. 327. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove,
                                                                                               Rhode Island and Connecticut.
                                                                               Sec. 328. Harris County, Texas.
                                                                               Sec. 329. Cap Sante Waterway, Washington.
                                                                               Sec. 330. Regional sediment management.
                                                                               Sec. 331. Additional assistance for critical projects.
                                                                               Sec. 332. Project modification authorizations.
                                                                               Sec. 333. Application of credit.
                                                                               Sec. 334. Project reauthorizations.
                                                                               Sec. 335. Conveyances.
                                                                               Sec. 336. Repeals.

                                                                                                TITLE IV—WATER RESOURCES INFRASTRUCTURE

                                                                               Sec. 401. Project authorizations.
                                                                               Sec. 402. Special rules.
                                                                               Sec. 403. Authorization of projects based on feasibility studies prepared by non-
                                                                                               Federal interests.

                                                                                                           TITLE V—BUDGETARY EFFECTS

                                                                               Sec. 501. Determination of Budgetary Effects.

                                                                         1     SEC. 2. SECRETARY DEFINED.

                                                                         2              In this Act, the term ‘‘Secretary’’ means the Sec-
                                                                         3 retary of the Army.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00004   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  5
                                                                         1         TITLE I—GENERAL PROVISIONS
                                                                         2     SEC. 101. BUDGETARY TREATMENT EXPANSION AND AD-

                                                                         3                             JUSTMENT FOR THE HARBOR MAINTENANCE

                                                                         4                             TRUST FUND.

                                                                         5              (a) IN GENERAL.—Section 14003 of division B of the
                                                                         6 CARES Act (Public Law 116–136) is amended to read
                                                                         7 as follows:
                                                                         8              ‘‘SEC. 14003. Section 251(b)(2) of the Balanced
                                                                         9 Budget and Emergency Deficit Control Act of 1985 (2
                                                                       10 U.S.C. 901(b)(2)) is amended by adding at the end the
                                                                       11 following:
                                                                       12                                  ‘‘ ‘(H)       HARBOR               MAINTENANCE                  ACTIVI-

                                                                       13                         TIES.—If, for any fiscal year, appropriations for

                                                                       14                         the Construction, Mississippi River and Tribu-
                                                                       15                         taries, and Operation and Maintenance ac-
                                                                       16                         counts of the Corps of Engineers are enacted
                                                                       17                         that are derived from the Harbor Maintenance
                                                                       18                         Trust Fund established under section 9505(a)
                                                                       19                         of the Internal Revenue Code of 1986 and that
                                                                       20                         the Congress designates in statute as being for
                                                                       21                         harbor operations and maintenance activities,
                                                                       22                         then the adjustment for that fiscal year shall be
                                                                       23                         the total of such appropriations that are derived




kjohnson on DSK79L0C42PROD with BILLS
                                                                       24                         from such Fund and designated as being for



                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00005   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  6
                                                                         1                        harbor operations and maintenance activi-
                                                                         2                        ties.’.’’.
                                                                         3              (b) EFFECTIVE DATE.—The amendment made by
                                                                         4 subsection (a) shall take effect as if included in the enact-
                                                                         5 ment of the CARES Act (Public Law 116–136).
                                                                         6     SEC. 102. FUNDING FOR NAVIGATION.

                                                                         7              (a) FUNDING FOR NAVIGATION.—Section 210 of the
                                                                         8 Water Resources Development Act of 1986 (33 U.S.C.
                                                                         9 2238) is amended, in the section heading, by striking
                                                                       10 ‘‘AUTHORIZATION OF APPROPRIATIONS’’ and insert-
                                                                       11 ing ‘‘FUNDING FOR NAVIGATION’’.
                                                                       12               (b) OPERATION AND MAINTENANCE OF HARBOR
                                                                       13 PROJECTS.—Section 210(c) of the Water Resources De-
                                                                       14 velopment Act of 1986 (33 U.S.C. 2238(c)) is amended—
                                                                       15                         (1) by amending paragraph (1) to read as fol-
                                                                       16               lows:
                                                                       17                         ‘‘(1) IN GENERAL.—For each fiscal year, of the
                                                                       18               funds made available under this section (including
                                                                       19               funds appropriated from the Harbor Maintenance
                                                                       20               Trust Fund), the Secretary shall make expenditures
                                                                       21               to pay for operation and maintenance costs of the
                                                                       22               harbors and inland harbors referred to in subsection
                                                                       23               (a)(2), using—
                                                                       24                                  ‘‘(A) not less than 20 percent of such



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         funds for emerging harbor projects, to the ex-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00006   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  7
                                                                         1                        tent there are identifiable operations and main-
                                                                         2                        tenance needs, including eligible breakwater and
                                                                         3                        jetty needs, at such harbor projects;
                                                                         4                                 ‘‘(B) not less than 12 percent of such
                                                                         5                        funds for projects that are located within the
                                                                         6                        Great Lakes Navigation System;
                                                                         7                                 ‘‘(C) 10 percent of such funds for ex-
                                                                         8                        panded uses carried out at donor ports, as such
                                                                         9                        term is defined in section 2106 of the Water
                                                                       10                         Resources Reform and Development Act of
                                                                       11                         2014 (33 U.S.C. 2238c); and
                                                                       12                                  ‘‘(D) any remaining funds for operation
                                                                       13                         and maintenance costs of any harbor or inland
                                                                       14                         harbor referred to in subsection (a)(2) based on
                                                                       15                         an equitable allocation of such funds among
                                                                       16                         such harbors and inland harbors.’’;
                                                                       17                         (2) by amending paragraph (3) to read as fol-
                                                                       18               lows:
                                                                       19                         ‘‘(3) ADDITIONAL                    USES AT EMERGING HAR-

                                                                       20               BORS.—

                                                                       21                                  ‘‘(A) IN GENERAL.—In each fiscal year,
                                                                       22                         the       Secretary             may          use       not       more    than
                                                                       23                         $5,000,000 of funds designated for emerging
                                                                       24                         harbor projects under paragraph (1)(A) to pay



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         for the costs of up to 10 projects for mainte-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00007   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  8
                                                                         1                        nance dredging of a marina or berthing area, in
                                                                         2                        an emerging harbor, that includes an area that
                                                                         3                        is located adjacent to, or is accessible by, a
                                                                         4                        Federal navigation project, subject to subpara-
                                                                         5                        graphs (B) and (C) of this paragraph.
                                                                         6                                 ‘‘(B) ELIGIBLE                     EMERGING             HARBORS.—

                                                                         7                        The Secretary may use funds as authorized
                                                                         8                        under subparagraph (A) at an emerging harbor
                                                                         9                        that—
                                                                       10                                          ‘‘(i) supports commercial activities, in-
                                                                       11                                  cluding          commercial               fishing         operations,
                                                                       12                                  commercial fish processing operations, rec-
                                                                       13                                  reational and sport fishing, and commer-
                                                                       14                                  cial boat yards; or
                                                                       15                                          ‘‘(ii) supports activities of the Sec-
                                                                       16                                  retary of the department in which the
                                                                       17                                  Coast Guard is operating.
                                                                       18                                  ‘‘(C)        COST-SHARING                   REQUIREMENTS.—

                                                                       19                         The Secretary shall require a non-Federal inter-
                                                                       20                         est to contribute not less than 25 percent of the
                                                                       21                         costs for maintenance dredging of that portion
                                                                       22                         of a maintenance dredging project described in
                                                                       23                         subparagraph (A) that is located outside of the
                                                                       24                         Federal navigation project, which may be pro-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         vided as an in-kind contribution, including


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00008   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                                  9
                                                                         1                        through the use of dredge equipment owned by
                                                                         2                        non-Federal interest to carry out such activi-
                                                                         3                        ties.’’; and
                                                                         4                        (3) by adding at the end the following:
                                                                         5                        ‘‘(5) EMERGENCY EXPENDITURES.—Nothing in
                                                                         6              this subsection prohibits the Secretary from making
                                                                         7              an expenditure to pay for the operation and mainte-
                                                                         8              nance costs of a specific harbor or inland harbor, in-
                                                                         9              cluding the transfer of funding from the operation
                                                                       10               and maintenance of a separate project, if—
                                                                       11                                  ‘‘(A) the Secretary determines that the ac-
                                                                       12                         tion is necessary to address the navigation
                                                                       13                         needs of a harbor or inland harbor where safe
                                                                       14                         navigation has been severely restricted due to
                                                                       15                         an unforeseen event; and
                                                                       16                                  ‘‘(B) the Secretary provides within 90 days
                                                                       17                         of the action notice and information on the
                                                                       18                         need for the action to the Committee on Envi-
                                                                       19                         ronment and Public Works and the Committee
                                                                       20                         on Appropriations of the Senate and the Com-
                                                                       21                         mittee on Transportation and Infrastructure
                                                                       22                         and the Committee on Appropriations of the
                                                                       23                         House of Representatives.’’.
                                                                       24               (c) PRIORITIZATION.—Section 210 of the Water Re-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 sources Development Act of 1986 (33 U.S.C. 2238) is


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00009   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              10
                                                                         1 amended by striking subsection (d) and redesignating sub-
                                                                         2 sections (e) and (f) as subsections (d) and (e), respectively.
                                                                         3              (d) ASSESSMENT OF HARBORS AND INLAND HAR-
                                                                         4     BORS.—Section 210(d)(2)(A)(ii) of the Water Resources

                                                                         5 Development Act of 1986 (as so redesignated) is amended
                                                                         6 by striking ‘‘expanded uses at eligible harbors or inland
                                                                         7 harbors referred to in subsection (d)(2)’’ and inserting
                                                                         8 ‘‘uses described in paragraphs (1)(C) and (3) of sub-
                                                                         9 section (c)’’.
                                                                       10               (e) DEFINITIONS.—Section 210(e) of the Water Re-
                                                                       11 sources Development Act of 1986 (as so redesignated) is
                                                                       12 amended—
                                                                       13                         (1) by striking paragraphs (6) through (9);
                                                                       14                         (2) by redesignating paragraphs (3) through
                                                                       15               (5) as paragraphs (4) through (6), respectively;
                                                                       16                         (3) by striking paragraph (2) and inserting the
                                                                       17               following:
                                                                       18                         ‘‘(2) EMERGING HARBOR.—The term ‘emerging
                                                                       19               harbor’ means a harbor or inland harbor referred to
                                                                       20               in       subsection             (a)(2)          that        transits          less   than
                                                                       21               1,000,000 tons of cargo annually.
                                                                       22                         ‘‘(3) EMERGING HARBOR PROJECT.—The term
                                                                       23               ‘emerging harbor project’ means a project that is as-
                                                                       24               signed to an emerging harbor.’’; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00010   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              11
                                                                         1                        (4) in paragraph (4) (as so redesignated), by
                                                                         2              adding at the end the following:
                                                                         3                                 ‘‘(C) An in-water improvement, if the im-
                                                                         4                        provement—
                                                                         5                                         ‘‘(i) is for the seismic reinforcement of
                                                                         6                                 a wharf or other berthing structure, or the
                                                                         7                                 repair or replacement of a deteriorating
                                                                         8                                 wharf or other berthing structure, at a
                                                                         9                                 port facility;
                                                                       10                                          ‘‘(ii) benefits commercial navigation at
                                                                       11                                  the harbor; and
                                                                       12                                          ‘‘(iii) is located in, or adjacent to, a
                                                                       13                                  berth that is accessible to a Federal navi-
                                                                       14                                  gation project.
                                                                       15                                  ‘‘(D) An activity to maintain slope stability
                                                                       16                         at a berth in a harbor that is accessible to a
                                                                       17                         Federal navigation project if such activity bene-
                                                                       18                         fits commercial navigation at the harbor.’’.
                                                                       19      SEC. 103. ANNUAL REPORT TO CONGRESS ON THE HARBOR

                                                                       20                              MAINTENANCE TRUST FUND.

                                                                       21               Section 330 of the Water Resources Development Act
                                                                       22 of 1992 (26 U.S.C. 9505 note; 106 Stat. 4851) is amend-
                                                                       23 ed—
                                                                       24                         (1) in subsection (a)—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00011   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              12
                                                                         1                                 (A) by striking ‘‘and annually thereafter,’’
                                                                         2                        and inserting ‘‘and annually thereafter concur-
                                                                         3                        rent with the submission of the President’s an-
                                                                         4                        nual budget request to Congress,’’; and
                                                                         5                                 (B) by striking ‘‘Public Works and Trans-
                                                                         6                        portation’’ and inserting ‘‘Transportation and
                                                                         7                        Infrastructure’’; and
                                                                         8                        (2) in subsection (b)(1) by adding at the end
                                                                         9              the following:
                                                                       10                                  ‘‘(D) A description of the expected expend-
                                                                       11                         itures from the trust fund to meet the needs of
                                                                       12                         navigation for the fiscal year of the budget re-
                                                                       13                         quest.’’.
                                                                       14      SEC. 104. ADDITIONAL MEASURES AT DONOR PORTS AND

                                                                       15                              ENERGY TRANSFER PORTS.

                                                                       16               (a) DEFINITIONS.—Section 2106(a) of the Water Re-
                                                                       17 sources Reform and Development Act of 2014 (33 U.S.C.
                                                                       18 2238c(a)) is amended—
                                                                       19                         (1) in paragraph (3)(A)—
                                                                       20                                  (A) by amending clause (ii) to read as fol-
                                                                       21                         lows:
                                                                       22                                          ‘‘(ii) at which the total amount of har-
                                                                       23                                  bor maintenance taxes collected (including
                                                                       24                                  the estimated taxes related to domestic



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  cargo and cruise passengers) comprise not


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00012   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              13
                                                                         1                                 less than $15,000,000 annually of the total
                                                                         2                                 funding of the Harbor Maintenance Trust
                                                                         3                                 Fund in each of the previous 3 fiscal
                                                                         4                                 years;’’;
                                                                         5                                 (B) in clause (iii), by inserting ‘‘(including
                                                                         6                        the estimated taxes related to domestic cargo
                                                                         7                        and cruise passengers)’’ after ‘‘taxes collected’’;
                                                                         8                        and
                                                                         9                                 (C) in clause (iv), by striking ‘‘fiscal year
                                                                       10                         2012’’ and inserting ‘‘each of the previous 3 fis-
                                                                       11                         cal years’’;
                                                                       12                         (2) in paragraph (5)(B), by striking ‘‘fiscal year
                                                                       13               2012’’ each place it appears and inserting ‘‘each of
                                                                       14               the previous 3 fiscal years’’;
                                                                       15                         (3) by redesignating paragraph (8) as para-
                                                                       16               graph (9) and inserting after paragraph (7) the fol-
                                                                       17               lowing:
                                                                       18                         ‘‘(8) HARBOR MAINTENANCE TRUST FUND.—
                                                                       19               The term ‘Harbor Maintenance Trust Fund’ means
                                                                       20               the Harbor Maintenance Trust Fund established by
                                                                       21               section 9505 of the Internal Revenue Code of
                                                                       22               1986.’’; and
                                                                       23                         (4) in paragraph (9), as so redesignated—
                                                                       24                                  (A) by amending subparagraph (B) to read



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         as follows:


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00013   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              14
                                                                         1                                 ‘‘(B) at which the total amount of harbor
                                                                         2                        maintenance taxes collected (including the esti-
                                                                         3                        mated taxes related to domestic cargo and
                                                                         4                        cruise passengers) comprise annually more than
                                                                         5                        $5,000,000 but less than $15,000,000 of the
                                                                         6                        total funding of the Harbor Maintenance Trust
                                                                         7                        Fund in each of the previous 3 fiscal years;’’;
                                                                         8                                 (B) in subparagraph (C), by inserting ‘‘(in-
                                                                         9                        cluding the estimated taxes related to domestic
                                                                       10                         cargo and cruise passengers)’’ after ‘‘taxes col-
                                                                       11                         lected’’; and
                                                                       12                                  (C) in subparagraph (D), by striking ‘‘fis-
                                                                       13                         cal year 2012’’ and inserting ‘‘each of the pre-
                                                                       14                         vious 3 fiscal years’’.
                                                                       15               (b) REPORT TO CONGRESS; AUTHORIZATION OF AP-
                                                                       16      PROPRIATIONS.—Section                              2106 of the Water Resources
                                                                       17 Reform and Development Act of 2014 (33 U.S.C. 2238c)
                                                                       18 is amended—
                                                                       19                         (1) by striking subsection (e) and redesignating
                                                                       20               subsections (f) and (g) as subsections (e) and (f), re-
                                                                       21               spectively; and
                                                                       22                         (2) in subsection (e), as so redesignated—
                                                                       23                                  (A) in paragraph (1), by striking ‘‘2020’’
                                                                       24                         and inserting ‘‘2030’’; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  (B) by striking paragraph (3).


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00014   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              15
                                                                         1     SEC. 105. ASSUMPTION OF MAINTENANCE OF A LOCALLY

                                                                         2                             PREFERRED PLAN.

                                                                         3              Section 204(f) of the Water Resources Development
                                                                         4 Act of 1986 (33 U.S.C. 2232(f)) is amended to read as
                                                                         5 follows:
                                                                         6              ‘‘(f) OPERATION AND MAINTENANCE.—
                                                                         7                        ‘‘(1) ASSUMPTION OF MAINTENANCE.—When-
                                                                         8              ever a non-Federal interest carries out improvements
                                                                         9              to a federally authorized harbor or inland harbor,
                                                                       10               the Secretary shall be responsible for operation and
                                                                       11               maintenance in accordance with section 101(b) if—
                                                                       12                                  ‘‘(A) before construction of the improve-
                                                                       13                         ments—
                                                                       14                                          ‘‘(i) the Secretary determines that the
                                                                       15                                  improvements are feasible and consistent
                                                                       16                                  with the purposes of this title; and
                                                                       17                                          ‘‘(ii) the Secretary and the non-Fed-
                                                                       18                                  eral interest execute a written agreement
                                                                       19                                  relating to operation and maintenance of
                                                                       20                                  the improvements;
                                                                       21                                  ‘‘(B) the Secretary certifies that the
                                                                       22                         project or separable element of the project is
                                                                       23                         constructed in accordance with applicable per-
                                                                       24                         mits and appropriate engineering and design




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         standards; and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00015   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              16
                                                                         1                                 ‘‘(C) the Secretary does not find that the
                                                                         2                        project or separable element is no longer fea-
                                                                         3                        sible.
                                                                         4                        ‘‘(2) FEDERAL FINANCIAL PARTICIPATION IN
                                                                         5              THE COSTS OF A LOCALLY PREFERRED PLAN.—In

                                                                         6              the case of improvements determined by the Sec-
                                                                         7              retary pursuant to paragraph (1)(A)(i) to deviate
                                                                         8              from the national economic development plan, the
                                                                         9              Secretary shall be responsible for all operation and
                                                                       10               maintenance costs of such improvements, as de-
                                                                       11               scribed in section 101(b), including costs in excess
                                                                       12               of the costs of the national economic development
                                                                       13               plan, if the Secretary determines that the improve-
                                                                       14               ments satisfy the requirements of paragraph (1).’’.
                                                                       15      SEC. 106. COAST GUARD ANCHORAGES.

                                                                       16               The Secretary is authorized to perform dredging at
                                                                       17 Federal expense within and adjacent to anchorages on the
                                                                       18 Columbia River established by the Coast Guard pursuant
                                                                       19 to section 7 of the Act of March 14, 1915 (33 U.S.C. 471),
                                                                       20 to provide safe anchorage for deep draft vessels commen-
                                                                       21 surate with the authorized Federal navigation channel
                                                                       22 depth, including advanced maintenance.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00016   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              17
                                                                         1     SEC. 107. STATE CONTRIBUTION OF FUNDS FOR CERTAIN

                                                                         2                             OPERATION AND MAINTENANCE COSTS.

                                                                         3              In carrying out eligible operations and maintenance
                                                                         4 activities within the Great Lakes Navigation System pur-
                                                                         5 suant to section 210 of the Water Resources Development
                                                                         6 Act of 1986 (33 U.S.C. 2238) in a State that has imple-
                                                                         7 mented any additional State limitation on the disposal of
                                                                         8 dredged material in the open waters of such State, the
                                                                         9 Secretary may, pursuant to section 5 of the Act of June
                                                                       10 22, 1936 (33 U.S.C. 701h), receive from such State, and
                                                                       11 expend, such funds as may be contributed by the State
                                                                       12 to cover the additional costs for operations and mainte-
                                                                       13 nance activities for a harbor or inland harbor within such
                                                                       14 State that result from such limitation.
                                                                       15      SEC. 108. INLAND WATERWAY PROJECTS.

                                                                       16               (a) IN GENERAL.—Notwithstanding section 102 of
                                                                       17 the Water Resources Development Act of 1986 (33 U.S.C.
                                                                       18 2212), 35 percent of the costs of construction of any
                                                                       19 project for navigation on the inland waterways shall be
                                                                       20 paid from amounts appropriated from the Inland Water-
                                                                       21 ways Trust Fund—
                                                                       22                         (1) during each of fiscal years 2021 through
                                                                       23               2027; and
                                                                       24                         (2) for a project the construction of which is




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               initiated during such period, in each fiscal year until
                                                                       26               such construction is complete.
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00017   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              18
                                                                         1              (b) PRIORITIZATION.—In selecting projects described
                                                                         2 in subsection (a) for which to initiate construction during
                                                                         3 any of fiscal years 2021 through 2027, the Secretary shall
                                                                         4 prioritize projects that are included in the most recent 20-
                                                                         5 year program for making capital investments developed
                                                                         6 under section 302(d) of the Water Resources Development
                                                                         7 Act of 1986 (33 U.S.C. 2251(d)).
                                                                         8     SEC. 109. IMPLEMENTATION OF WATER RESOURCES PRIN-

                                                                         9                             CIPLES AND REQUIREMENTS.

                                                                       10               (a) IN GENERAL.—Not later than 180 days after the
                                                                       11 date of enactment of this Act, the Secretary shall issue
                                                                       12 final agency-specific procedures necessary to implement
                                                                       13 the principles and requirements and the interagency
                                                                       14 guidelines.
                                                                       15               (b) DEVELOPMENT OF FUTURE WATER RESOURCES
                                                                       16 DEVELOPMENT PROJECTS.—The procedures required by
                                                                       17 subsection (a) shall ensure that the Secretary, in the for-
                                                                       18 mulation of future water resources development projects—
                                                                       19                         (1) develops such projects in accordance with—
                                                                       20                                  (A) the guiding principles established by
                                                                       21                         the principles and requirements; and
                                                                       22                                  (B) the national water resources planning
                                                                       23                         policy established by section 2031(a) of the
                                                                       24                         Water Resources Development Act of 2007 (42



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         U.S.C. 1962–3(a)); and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00018   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              19
                                                                         1                        (2) fully identifies and analyzes national eco-
                                                                         2              nomic development benefits, regional economic devel-
                                                                         3              opment benefits, environmental quality benefits, and
                                                                         4              other societal effects.
                                                                         5              (c) REVIEW AND UPDATE.—Every 5 years, the Sec-
                                                                         6 retary shall review and, where appropriate, revise the pro-
                                                                         7 cedures required by subsection (a).
                                                                         8              (d) PUBLIC REVIEW, NOTICE, AND COMMENT.—In
                                                                         9 issuing, reviewing, and revising the procedures required by
                                                                       10 this section, the Secretary shall—
                                                                       11                         (1) provide notice to interested non-Federal
                                                                       12               stakeholders of the Secretary’s intent to revise the
                                                                       13               procedures;
                                                                       14                         (2) provide opportunities for interested non-
                                                                       15               Federal stakeholders to engage with, and provide
                                                                       16               input and recommendations to, the Secretary on the
                                                                       17               revision of the procedures; and
                                                                       18                         (3) solicit and consider public and expert com-
                                                                       19               ments.
                                                                       20               (e) DEFINITIONS.—In this section:
                                                                       21                         (1)      INTERAGENCY                    GUIDELINES.—The                  term
                                                                       22               ‘‘interagency guidelines’’ means the interagency
                                                                       23               guidelines contained in the document finalized by
                                                                       24               the Council on Environmental Quality pursuant to



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               section 2031 of the Water Resources Development


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00019   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              20
                                                                         1              Act of 2007 (42 U.S.C. 1962–3) in December 2014,
                                                                         2              to implement the principles and requirements.
                                                                         3                        (2) PRINCIPLES                     AND         REQUIREMENTS.—The

                                                                         4              term ‘‘principles and requirements’’ means the prin-
                                                                         5              ciples and requirements contained in the document
                                                                         6              prepared by the Council on Environmental Quality
                                                                         7              pursuant to section 2031 of the Water Resources
                                                                         8              Development Act of 2007 (42 U.S.C. 1962–3), enti-
                                                                         9              tled ‘‘Principles and Requirements for Federal In-
                                                                       10               vestments in Water Resources’’, and dated March
                                                                       11               2013.
                                                                       12      SEC. 110. RESILIENCY PLANNING ASSISTANCE.

                                                                       13               (a) IN GENERAL.—Section 206(a) of the Flood Con-
                                                                       14 trol Act of 1960 (33 U.S.C. 709a(a)) is amended by in-
                                                                       15 serting ‘‘, to avoid repetitive flooding impacts, to antici-
                                                                       16 pate, prepare, and adapt to changing climatic conditions
                                                                       17 and extreme weather events, and to withstand, respond to,
                                                                       18 and recover rapidly from disruption due to the flood haz-
                                                                       19 ards’’ after ‘‘in planning to ameliorate the flood hazard’’.
                                                                       20               (b) PRIORITIZING FLOOD RISK RESILIENCY TECH-
                                                                       21      NICAL ASSISTANCE FOR ECONOMICALLY DISADVANTAGED

                                                                       22 COMMUNITIES.—In carrying out section 206 of the Flood
                                                                       23 Control Act of 1960 (33 U.S.C. 709a), the Secretary shall
                                                                       24 prioritize the provision of technical assistance to support



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00020   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              21
                                                                         1 flood risk resiliency planning efforts of an economically
                                                                         2 disadvantaged community.
                                                                         3     SEC. 111. PROJECT CONSULTATION.

                                                                         4              (a) REPORTS REQUIRED.—Not later than 180 days
                                                                         5 after the date of enactment of this Act, the Secretary shall
                                                                         6 submit the following reports:
                                                                         7                        (1) The report required under section 1214 of
                                                                         8              the Water Resources Development Act of 2018 (132
                                                                         9              Stat. 3809).
                                                                       10                         (2)       The          report          required            under         section
                                                                       11               1120(a)(3) of the Water Resources Development Act
                                                                       12               of 2016 (130 Stat. 1643).
                                                                       13               (b) CONSULTATION.—
                                                                       14                         (1) AGENCIES                    AND         TRIBES.—The              Secretary
                                                                       15               shall ensure that all covered community consultation
                                                                       16               policies, regulations, and guidance of the Corps of
                                                                       17               Engineers continue to be implemented, and that con-
                                                                       18               sultations with Federal and State agencies and In-
                                                                       19               dian Tribes required for a water resources develop-
                                                                       20               ment project are carried out.
                                                                       21                         (2) COMMUNITIES.—The Secretary shall ensure
                                                                       22               that any covered communities, including such com-
                                                                       23               munities identified in the reports submitted under
                                                                       24               subsection (a), that are found to be disproportion-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               ately or adversely affected are included in consulta-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00021   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              22
                                                                         1              tion policies, regulations, and guidance of the Corps
                                                                         2              of Engineers.
                                                                         3                        (3) PROJECT PLANNING AND CONSTRUCTION.—
                                                                         4              The Secretary shall ensure that covered communities
                                                                         5              are consulted in the development of water resources
                                                                         6              development project planning and construction, for
                                                                         7              the purposes of achieving environmental justice and
                                                                         8              addressing any disproportionate or adverse effects
                                                                         9              on such communities.
                                                                       10               (c) ENVIRONMENTAL JUSTICE UPDATES.—
                                                                       11                         (1) IN GENERAL.—Not later than 1 year after
                                                                       12               the date of enactment of this Act, the Secretary
                                                                       13               shall update any policies, regulations, and guidance
                                                                       14               of the Corps of Engineers related to achieving envi-
                                                                       15               ronmental justice for covered communities.
                                                                       16                         (2) RECOMMENDATIONS AND CONSULTATION.—
                                                                       17               In carrying out paragraph (1), the Secretary shall—
                                                                       18                                  (A) consult with a wide array of represent-
                                                                       19                         atives of covered communities; and
                                                                       20                                  (B) use the recommendations from the re-
                                                                       21                         ports submitted under subsection (a).
                                                                       22               (d) COMMUNITY ENGAGEMENT.—The Secretary shall
                                                                       23 ensure that in carrying out authorized water resources de-
                                                                       24 velopment projects in, and all other activities of the Corps



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00022   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              23
                                                                         1 of Engineers related to, covered communities, the Corps
                                                                         2 of Engineers—
                                                                         3                        (1) promotes the meaningful involvement of
                                                                         4              such communities in the project development and
                                                                         5              implementation, enforcement efforts, and other ac-
                                                                         6              tivities of the Corps of Engineers;
                                                                         7                        (2) provides guidance and technical assistance
                                                                         8              to such communities to increase understanding of
                                                                         9              the project development and implementation activi-
                                                                       10               ties, regulations, and policies of the Corps of Engi-
                                                                       11               neers; and
                                                                       12                         (3) cooperates with State, Tribal, and local gov-
                                                                       13               ernments with respect to activities carried out pur-
                                                                       14               suant to this subsection.
                                                                       15               (e) TRIBAL LANDS AND CONSULTATION.—The Sec-
                                                                       16 retary shall ensure that in carrying out authorized water
                                                                       17 resources development projects and in all other activities
                                                                       18 of the Corps of Engineers, that the Corps of Engineers—
                                                                       19                         (1)(A) consults with Indian Tribes specifically
                                                                       20               on any Tribal lands near or adjacent to any activi-
                                                                       21               ties of the Corps of Engineers, for purposes of iden-
                                                                       22               tifying lands of ancestral, cultural, or religious im-
                                                                       23               portance; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00023   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              24
                                                                         1                        (B) cooperates with Indian Tribes to avoid, or
                                                                         2              otherwise find alternate solutions with respect to,
                                                                         3              such lands; and
                                                                         4                        (2)(A) consults with Indian Tribes specifically
                                                                         5              on any Tribal areas near or adjacent to any activi-
                                                                         6              ties of the Corps of Engineers, for purposes of iden-
                                                                         7              tifying lands, waters, and other resources critical to
                                                                         8              the livelihood of the Indian Tribes; and
                                                                         9                        (B) cooperates with Indian Tribes to avoid, or
                                                                       10               otherwise find alternate solutions with respect to,
                                                                       11               such areas.
                                                                       12               (f) DEFINITIONS.—In this section:
                                                                       13                         (1) COMMUNITY OF COLOR.—The term ‘‘com-
                                                                       14               munity of color’’ means a community of individuals
                                                                       15               who are—
                                                                       16                                  (A) American Indian or Alaska Native;
                                                                       17                                  (B) Asian or Pacific Islander;
                                                                       18                                  (C) Black, not of Hispanic origin; or
                                                                       19                                  (D) Hispanic.
                                                                       20                         (2) COVERED COMMUNITY.—The term ‘‘covered
                                                                       21               community’’ means each of the following:
                                                                       22                                  (A) A community of color.
                                                                       23                                  (B) An economically disadvantaged com-
                                                                       24                         munity.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  (C) A rural community.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00024   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              25
                                                                         1                                 (D) A Tribal or indigenous community.
                                                                         2                        (3) STATE.—The term ‘‘State’’ means each of
                                                                         3              the several States, the District of Columbia, and
                                                                         4              each of the commonwealths, territories, and posses-
                                                                         5              sions of the United States.
                                                                         6     SEC. 112. REVIEW OF RESILIENCY ASSESSMENTS.

                                                                         7              (a) RESILIENCY ASSESSMENT.—
                                                                         8                        (1) IN GENERAL.—Not later than 180 days
                                                                         9              after the date of enactment of this section, and in
                                                                       10               conjunction with the development of procedures
                                                                       11               under section 109 of this Act, the Secretary is di-
                                                                       12               rected to review, and where appropriate, revise the
                                                                       13               existing planning guidance documents and regula-
                                                                       14               tions on the assessment of the effects of sea level
                                                                       15               rise on future water resources development projects
                                                                       16               to ensure that such guidance documents and regula-
                                                                       17               tions are based on the best available, peer-reviewed
                                                                       18               science and data on the current and future effects
                                                                       19               of sea level rise on coastal communities.
                                                                       20                         (2) COORDINATION.—In carrying out this sub-
                                                                       21               section, the Secretary shall—
                                                                       22                                  (A) coordinate the review with the Engi-
                                                                       23                         neer Research and Development Center, other
                                                                       24                         Federal and State agencies, and other relevant



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         entities; and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00025   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              26
                                                                         1                                 (B) to the maximum extent practicable and
                                                                         2                        where appropriate, utilize data provided to the
                                                                         3                        Secretary by such agencies.
                                                                         4              (b) ASSESSMENT OF BENEFITS OF SEA LEVEL RISE
                                                                         5 RESILIENCY IN FEASIBILITY REPORTS.—
                                                                         6                        (1) IN GENERAL.—Upon the request of a non-
                                                                         7              Federal interest, in carrying out a feasibility study
                                                                         8              for a project for flood risk mitigation, hurricane and
                                                                         9              storm damage risk reduction, or ecosystem restora-
                                                                       10               tion under section 905 of the Water Resources De-
                                                                       11               velopment Act of 1986 (33 U.S.C. 2282), the Sec-
                                                                       12               retary shall consider whether the need for the
                                                                       13               project is predicated upon or exacerbated by condi-
                                                                       14               tions related to sea level rise.
                                                                       15                         (2) SEA LEVEL RISE RESILIENCY BENEFITS.—
                                                                       16               To the maximum extent practicable, in carrying out
                                                                       17               a study pursuant to paragraph (1), the Secretary
                                                                       18               shall document the potential effects of sea level rise
                                                                       19               on the project, and benefits of the project relating
                                                                       20               to sea level rise, during the 50-year period after the
                                                                       21               date of completion of the project.
                                                                       22      SEC. 113. SMALL FLOOD CONTROL PROJECTS.

                                                                       23               Section 205 of the Flood Control Act of 1948 (33
                                                                       24 U.S.C. 701s) is amended by inserting ‘‘, and projects that



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 use natural features or nature-based features (as those


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00026   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              27
                                                                         1 terms are defined in section 1184(a) of the Water Re-
                                                                         2 sources Development Act of 2016 (33 U.S.C. 2289a(a))),’’
                                                                         3 after ‘‘nonstructural projects’’.
                                                                         4     SEC. 114. CONFORMING AMENDMENT.

                                                                         5              Section 103(b) of the Water Resources Development
                                                                         6 Act of 1986 (33 U.S.C. 2213) is amended—
                                                                         7                        (1) in the subsection heading, by striking
                                                                         8              ‘‘NONSTRUCTURAL FLOOD CONTROL PROJECTS’’
                                                                         9              and inserting ‘‘PROJECTS USING NONSTRUCTURAL,
                                                                       10               NATURAL, OR NATURE-BASED FEATURES’’; and
                                                                       11                         (2) in paragraph (1)—
                                                                       12                                  (A) by striking ‘‘nonstructural flood con-
                                                                       13                         trol measures’’ and inserting ‘‘a flood risk man-
                                                                       14                         agement or hurricane and storm damage risk
                                                                       15                         reduction measure using a nonstructural fea-
                                                                       16                         ture, or a natural feature or nature-based fea-
                                                                       17                         ture (as those terms are defined in section
                                                                       18                         1184(a) of the Water Resources Development
                                                                       19                         Act of 2016 (33 U.S.C. 2289a(a))),’’; and
                                                                       20                                  (B) by striking ‘‘cash during construction
                                                                       21                         of the project’’ and inserting ‘‘cash during con-
                                                                       22                         struction for a nonstructural feature if the costs
                                                                       23                         of land, easements, rights-of-way, dredged ma-
                                                                       24                         terial disposal areas, and relocations for such



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         feature are estimated to exceed 35 percent’’.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00027   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              28
                                                                         1     SEC. 115. FEASIBILITY STUDIES; REVIEW OF NATURAL AND

                                                                         2                             NATURE-BASED FEATURES.

                                                                         3              (a) TECHNICAL CORRECTION.—Section 1149(c) of
                                                                         4 the Water Resources Development Act of 2018 (33 U.S.C.
                                                                         5 2282 note; 132 Stat. 3787) is amended by striking ‘‘nat-
                                                                         6 ural infrastructure alternatives’’ and inserting ‘‘natural
                                                                         7 feature or nature-based feature alternatives (as such
                                                                         8 terms are defined in section 1184 of the Water Resources
                                                                         9 Development Act of 2016 (32 U.S.C. 2289a))’’.
                                                                       10               (b) SUMMARY OF ANALYSIS.—To the maximum ex-
                                                                       11 tent practicable, the Secretary shall include in each feasi-
                                                                       12 bility report developed under section 905 of the Water Re-
                                                                       13 sources Development Act of 1986 (33 U.S.C. 2282) for
                                                                       14 a project that contains a flood risk management or hurri-
                                                                       15 cane and storm damage risk reduction element, a sum-
                                                                       16 mary of the natural feature or nature-based feature alter-
                                                                       17 natives that were evaluated in the development of the fea-
                                                                       18 sibility report, and, if such alternatives were not included
                                                                       19 in the recommended plan, an explanation of why such al-
                                                                       20 ternatives were not included into the recommended plan.
                                                                       21      SEC. 116. REPORT ON CORROSION PREVENTION ACTIVI-

                                                                       22                              TIES.

                                                                       23               Not later than 180 days after the date of enactment
                                                                       24 of this Act, the Secretary shall submit to the Committee




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 on Transportation and Infrastructure of the House of
                                                                       26 Representatives and the Committee on Environment and
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00028   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              29
                                                                         1 Public Works of the Senate, and make publicly available,
                                                                         2 a report that describes—
                                                                         3                        (1) the extent to which the Secretary has car-
                                                                         4              ried out section 1033 of the Water Resources Re-
                                                                         5              form and Development Act of 2014 (33 U.S.C.
                                                                         6              2350);
                                                                         7                        (2) the extent to which the Secretary has incor-
                                                                         8              porated corrosion prevention activities (as defined in
                                                                         9              such         section)           at        water        resources           development
                                                                       10               projects constructed or maintained by the Secretary
                                                                       11               since the date of enactment of such section; and
                                                                       12                         (3) in instances where the Secretary has not in-
                                                                       13               corporated corrosion prevention activities at such
                                                                       14               water resources development projects since such
                                                                       15               date, an explanation as to why such corrosion pre-
                                                                       16               vention activities have not been incorporated.
                                                                       17      SEC. 117. QUANTIFICATION OF BENEFITS FOR FLOOD RISK

                                                                       18                              MANAGEMENT PROJECTS IN SEISMIC ZONES.

                                                                       19               (a) IN GENERAL.—Upon the request of the non-Fed-
                                                                       20 eral interest for a flood risk management project in a seis-
                                                                       21 mic zone, the Secretary shall quantify the seismic hazard
                                                                       22 risk reduction benefits for the project if the non-Federal
                                                                       23 interest identifies, and the Secretary approves, an accept-
                                                                       24 able methodology to quantify such benefits.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               (b) APPLICABILITY.—The Secretary shall—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00029   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              30
                                                                         1                        (1) include all associated seismic hazard risk re-
                                                                         2              duction benefits approved by the Secretary in the
                                                                         3              calculation of the national economic development
                                                                         4              benefit-cost ratio for a flood risk management
                                                                         5              project in a seismic hazard zone for purposes of plan
                                                                         6              formulation pursuant to section 905 of the Water
                                                                         7              Resources Development Act of 1986; and
                                                                         8                        (2) seek to maximize the combination of flood
                                                                         9              risk reduction and seismic hazard risk reduction
                                                                       10               benefits in the formulation of the national economic
                                                                       11               development alternative for such project.
                                                                       12      SEC. 118. FEDERAL INTEREST DETERMINATION.

                                                                       13               Section 905 of the Water Resources Development Act
                                                                       14 of 1986 (33 U.S.C. 2282) is amended by inserting after
                                                                       15 subsection (a) the following:
                                                                       16               ‘‘(b) FEDERAL INTEREST DETERMINATION.—
                                                                       17                         ‘‘(1) IN GENERAL.—In preparing a feasibility
                                                                       18               report under subsection (a) for a study that will ben-
                                                                       19               efit an economically disadvantaged community, upon
                                                                       20               request by the non-Federal interest for the study,
                                                                       21               the Secretary shall first determine the Federal inter-
                                                                       22               est in carrying out the study and the projects that
                                                                       23               may be proposed in the study.
                                                                       24                         ‘‘(2) COST SHARE.—The costs of a determina-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               tion under paragraph (1)—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00030   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              31
                                                                         1                                 ‘‘(A) shall be at Federal expense; and
                                                                         2                                 ‘‘(B) shall not exceed $200,000.
                                                                         3                        ‘‘(3) DEADLINE.—A determination under para-
                                                                         4              graph (1) shall be completed by not later than 120
                                                                         5              days after the date on which funds are made avail-
                                                                         6              able to the Secretary to carry out the determination.
                                                                         7                        ‘‘(4) TREATMENT.—
                                                                         8                                 ‘‘(A) TIMING.—The period during which a
                                                                         9                        determination is being completed under para-
                                                                       10                         graph (1) for a study shall not be included for
                                                                       11                         purposes of the deadline to complete a final fea-
                                                                       12                         sibility report under section 1001(a)(1) of the
                                                                       13                         Water Resources Reform and Development Act
                                                                       14                         of 2014 (33 U.S.C. 2282c(a)(1)).
                                                                       15                                  ‘‘(B) COST.—The cost of a determination
                                                                       16                         under paragraph (1) shall not be included for
                                                                       17                         purposes of the maximum Federal cost under
                                                                       18                         section 1001(a)(2) of the Water Resources Re-
                                                                       19                         form and Development Act of 2014 (33 U.S.C.
                                                                       20                         2282c(a)(2)).
                                                                       21                         ‘‘(5) REPORT TO NON-FEDERAL INTEREST.—If,
                                                                       22               based on a determination under paragraph (1), the
                                                                       23               Secretary determines that a study or project is not
                                                                       24               in the Federal interest because the project will not



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               result, or is unlikely to result, in a recommended


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00031   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              32
                                                                         1              plan that will produce national economic develop-
                                                                         2              ment benefits greater than cost, but may result in
                                                                         3              a technically sound and environmentally acceptable
                                                                         4              plan that is otherwise consistent with section 904 of
                                                                         5              the Water Resources Development Act of 1986 (33
                                                                         6              U.S.C. 2281), the Secretary shall issue a report to
                                                                         7              the non-Federal interest with recommendations on
                                                                         8              how the non-Federal interest might modify the pro-
                                                                         9              posal such that the project could be in the Federal
                                                                       10               interest and feasible.’’.
                                                                       11      SEC. 119. ECONOMICALLY DISADVANTAGED COMMUNITY

                                                                       12                              FLOOD PROTECTION AND HURRICANE AND

                                                                       13                              STORM DAMAGE REDUCTION STUDY PILOT

                                                                       14                              PROGRAM.

                                                                       15               (a) IN GENERAL.—Not later than 180 days after the
                                                                       16 date of enactment of this Act, the Secretary shall establish
                                                                       17 and implement a pilot program to evaluate opportunities
                                                                       18 to address the flood risk management and hurricane and
                                                                       19 storm damage risk reduction needs of economically dis-
                                                                       20 advantaged communities.
                                                                       21               (b) PARTICIPATION IN PILOT PROGRAM.—In car-
                                                                       22 rying out subsection (a), the Secretary shall—
                                                                       23                         (1) publish a notice in the Federal Register
                                                                       24               that requests from non-Federal interests proposals



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               for the potential feasibility study of a flood risk


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00032   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              33
                                                                         1              management project or hurricane and storm damage
                                                                         2              risk reduction project for an economically disadvan-
                                                                         3              taged community;
                                                                         4                        (2) upon request of a non-Federal interest for
                                                                         5              such a project, provide technical assistance to such
                                                                         6              non-Federal interest in the formulation of a proposal
                                                                         7              for a potential feasibility study to be submitted to
                                                                         8              the Secretary under the pilot program; and
                                                                         9                        (3) review such proposals and select 10 feasi-
                                                                       10               bility studies for such projects to be carried out by
                                                                       11               the Secretary, in coordination with the non-Federal
                                                                       12               interest, under this pilot program.
                                                                       13               (c) SELECTION CRITERIA.—In selecting a feasibility
                                                                       14 study under subsection (b)(3), the Secretary shall consider
                                                                       15 whether—
                                                                       16                         (1) the percentage of people living in poverty in
                                                                       17               the county or counties (or county-equivalent entity
                                                                       18               or entities) in which the project is located is above
                                                                       19               the percentage of people living in poverty in the
                                                                       20               State, based on census bureau data;
                                                                       21                         (2) the percentage of families with income
                                                                       22               above the poverty threshold but below the average
                                                                       23               household income in the county or counties (or coun-
                                                                       24               ty-equivalent entity or entities) in which the project



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00033   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              34
                                                                         1              is located is above the percentage of the same for
                                                                         2              the State, based on census bureau data;
                                                                         3                        (3) the percentage of the population that identi-
                                                                         4              fies as belonging to a minority or indigenous group
                                                                         5              in the county or counties (or county-equivalent enti-
                                                                         6              ty or entities) in which the project is located is above
                                                                         7              the average percentage in the State, based on census
                                                                         8              bureau data; and
                                                                         9                        (4) the project is addressing flooding or hurri-
                                                                       10               cane or storm damage effects that have a dispropor-
                                                                       11               tionate impact on a rural community or a commu-
                                                                       12               nity of color (as such term is defined in section 111
                                                                       13               of this Act), including Tribal or indigenous peoples.
                                                                       14               (d) ADMINISTRATION.—Notwithstanding the require-
                                                                       15 ments of section 105(a)(1)(A) of the Water Resources De-
                                                                       16 velopment Act of 1986 (33 U.S.C. 2215), the Federal
                                                                       17 share of the cost of a feasibility study carried out under
                                                                       18 the pilot program shall be 100 percent.
                                                                       19               (e) GEOGRAPHIC DIVERSITY.—When selecting feasi-
                                                                       20 bility studies under subsection (b)(3), the Secretary shall
                                                                       21 consider                 the       geographic              diversity           among             proposed
                                                                       22 projects.
                                                                       23               (f) STUDY REQUIREMENTS.—Feasibility studies car-
                                                                       24 ried out under this subsection shall, to the maximum ex-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 tent practical, incorporate natural features or nature-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00034   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              35
                                                                         1 based features (as such terms are defined in section 1184
                                                                         2 of the Water Resources Development Act of 2016 (33
                                                                         3 U.S.C. 2289a)), or a combination of such features and
                                                                         4 nonstructural features, that avoid or reduce at least 50
                                                                         5 percent of flood or storm damages in one or more of the
                                                                         6 alternatives included in the final alternatives evaluated.
                                                                         7              (g) NOTIFICATION.—The Secretary shall notify the
                                                                         8 Committee on Transportation and Infrastructure of the
                                                                         9 House of Representatives and the Committee on Environ-
                                                                       10 ment and Public Works of the Senate of the selection of
                                                                       11 each feasibility study under the pilot program.
                                                                       12               (h) COMPLETION.—Upon completion of a feasibility
                                                                       13 report for a feasibility study selected to be carried out
                                                                       14 under this section, the Secretary shall transmit the report
                                                                       15 to Congress for authorization, and shall include the report
                                                                       16 in the next annual report submitted under section 7001
                                                                       17 of the Water Resources Reform and Development Act of
                                                                       18 2014 (33 U.S.C. 2282d).
                                                                       19               (i) SUNSET.—The authority to commence a feasi-
                                                                       20 bility study under this section shall terminate on the date
                                                                       21 that is 10 years after the date of enactment of this Act.
                                                                       22               (j) REPORT.—Not later than 5 years and 10 years
                                                                       23 after the date of enactment of this Act, the Secretary shall
                                                                       24 submit to the Committee on Transportation and Infra-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 structure of the House of Representatives and the Com-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00035   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              36
                                                                         1 mittee on Environment and Public Works of the Senate,
                                                                         2 and make publicly available, a report detailing the results
                                                                         3 of the pilot program carried out under this section, includ-
                                                                         4 ing—
                                                                         5                        (1) a description of proposals received from
                                                                         6              non-Federal interests pursuant to subsection (b)(1);
                                                                         7                        (2) a description of technical assistance pro-
                                                                         8              vided to non-Federal interests under subsection
                                                                         9              (b)(2); and
                                                                       10                         (3) a description of proposals selected under
                                                                       11               subsection (b)(3) and criteria used to select such
                                                                       12               proposals.
                                                                       13               (k) STATE DEFINED.—In this section, the term
                                                                       14 ‘‘State’’ means each of the several States, the District of
                                                                       15 Columbia, and each of the commonwealths, territories, and
                                                                       16 possessions of the United States.
                                                                       17      SEC. 120. PERMANENT MEASURES TO REDUCE EMERGENCY

                                                                       18                              FLOOD FIGHTING NEEDS FOR COMMUNITIES

                                                                       19                              SUBJECT TO REPETITIVE FLOODING.

                                                                       20               (a) DEFINITIONS.—In this section:
                                                                       21                         (1) AFFECTED                    COMMUNITY.—The                      term ‘‘af-
                                                                       22               fected community’’ means a legally constituted pub-
                                                                       23               lic body (as that term is used in section 221(b) of
                                                                       24               the Flood Control Act of 1970 (42 U.S.C. 1962d–



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               5b(b))—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00036   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              37
                                                                         1                                 (A) with jurisdiction over an area that has
                                                                         2                        been subject to flooding in two or more events
                                                                         3                        in any 10-year period; and
                                                                         4                                 (B) that has received emergency flood-
                                                                         5                        fighting assistance, including construction of
                                                                         6                        temporary barriers by the Secretary, under sec-
                                                                         7                        tion 5 of the Act of August 18, 1941 (33
                                                                         8                        U.S.C. 701n) with respect to such flood events.
                                                                         9                        (2) NATURAL FEATURE; NATURE-BASED FEA-
                                                                       10               TURE.—The terms ‘‘natural feature’’ and ‘‘nature-

                                                                       11               based feature’’ have the meanings given those terms
                                                                       12               in section 1184 of the Water Resources Development
                                                                       13               Act of 2016 (33 U.S.C. 2289a).
                                                                       14               (b) PROGRAM.—
                                                                       15                         (1) IN GENERAL.—The Secretary is authorized
                                                                       16               to carry out a program to study, design, and con-
                                                                       17               struct water resources development projects through
                                                                       18               measures involving, among other things, strength-
                                                                       19               ening, raising, extending, realigning, or otherwise
                                                                       20               modifying existing flood control works, designing
                                                                       21               new works, and incorporating natural features, na-
                                                                       22               ture-based features, or nonstructural features, as ap-
                                                                       23               propriate to provide flood and coastal storm risk
                                                                       24               management to affected communities.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00037   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              38
                                                                         1                        (2) CONSIDERATIONS.—In carrying out para-
                                                                         2              graph (1), the Secretary shall, to the maximum ex-
                                                                         3              tent practical, review and, where appropriate, incor-
                                                                         4              porate natural features or nature-based features, or
                                                                         5              a combination of such features and nonstructural
                                                                         6              features, that avoid or reduce at least 50 percent of
                                                                         7              flood or storm damages in one or more of the alter-
                                                                         8              natives included in the final alternatives evaluated.
                                                                         9                        (3) CONSTRUCTION.—
                                                                       10                                  (A) IN           GENERAL.—The                     Secretary may
                                                                       11                         carry out a project described in paragraph (1)
                                                                       12                         without further congressional authorization if—
                                                                       13                                          (i) the Secretary determines that the
                                                                       14                                  project—
                                                                       15                                                   (I) is advisable to reduce the risk
                                                                       16                                          of flooding for an affected community;
                                                                       17                                          and
                                                                       18                                                   (II) produces benefits that are in
                                                                       19                                          excess of the estimated costs; and
                                                                       20                                          (ii) the Federal share of the cost of
                                                                       21                                  the         construction                does            not     exceed
                                                                       22                                  $15,000,000.
                                                                       23                                  (B) SPECIFIC                   AUTHORIZATION.—If                   the
                                                                       24                         Federal share of the cost of a project described



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         in paragraph (1) exceeds $15,000,000, the Sec-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00038   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              39
                                                                         1                        retary shall submit the project recommendation
                                                                         2                        to Congress for authorization prior to construc-
                                                                         3                        tion, and shall include the project recommenda-
                                                                         4                        tion in the next annual report submitted under
                                                                         5                        section 7001 of the Water Resources Reform
                                                                         6                        and Development Act of 2014.
                                                                         7                                 (C) FINANCING.—
                                                                         8                                         (i) CONTRIBUTIONS.—If, based on a
                                                                         9                                 study carried out pursuant to paragraph
                                                                       10                                  (1), the Secretary determines that a
                                                                       11                                  project described in paragraph (1) will not
                                                                       12                                  produce benefits greater than cost, the
                                                                       13                                  Secretary shall allow the affected commu-
                                                                       14                                  nity to pay, or provide contributions equal
                                                                       15                                  to, an amount sufficient to make the re-
                                                                       16                                  maining costs of design and construction
                                                                       17                                  of the project equal to the estimated value
                                                                       18                                  of the benefits of the project.
                                                                       19                                          (ii)       EFFECT                ON         NON-FEDERAL

                                                                       20                                  SHARE.—Amounts provided by an affected

                                                                       21                                  community under clause (i) shall be in ad-
                                                                       22                                  dition to any payments or contributions
                                                                       23                                  the affected community is required to pro-
                                                                       24                                  vide toward the remaining costs of design



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  and construction of the project under sec-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00039   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              40
                                                                         1                                 tion 103 of the Water Resources Develop-
                                                                         2                                 ment Act of 1986 (33 U.S.C. 2213).
                                                                         3                        (4) ABILITY TO PAY.—
                                                                         4                                 (A) IN GENERAL.—Any cost-sharing agree-
                                                                         5                        ment for a project entered into pursuant to this
                                                                         6                        section shall be subject to the ability of the af-
                                                                         7                        fected community to pay.
                                                                         8                                 (B) DETERMINATION.—The ability of any
                                                                         9                        affected community to pay shall be determined
                                                                       10                         by the Secretary in accordance with procedures
                                                                       11                         established by the Secretary.
                                                                       12                                  (C) EFFECT OF REDUCTION.—Any reduc-
                                                                       13                         tion in the non-Federal share of the cost of a
                                                                       14                         project described in paragraph (1) as a result
                                                                       15                         of a determination under this paragraph shall
                                                                       16                         not be included in the Federal share for pur-
                                                                       17                         poses of subparagraphs (A) and (B) of para-
                                                                       18                         graph (3).
                                                                       19      SEC. 121. EMERGENCY RESPONSE TO NATURAL DISASTERS.

                                                                       20               (a) IN GENERAL.—Section 5 of the Act of August
                                                                       21 18, 1941 (33 U.S.C. 701n) is amended—
                                                                       22                         (1) in subsection (a), by adding at the end the
                                                                       23               following—
                                                                       24                         ‘‘(5) FEASIBILITY STUDY.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00040   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              41
                                                                         1                                 ‘‘(A) DETERMINATION.—Not later than
                                                                         2                        180 days after receiving, from a non-Federal
                                                                         3                        sponsor of a project to repair or rehabilitate a
                                                                         4                        flood control work described in paragraph (1),
                                                                         5                        a request to initiate a feasibility study to fur-
                                                                         6                        ther modify the relevant flood control work to
                                                                         7                        provide for an increased level of protection, the
                                                                         8                        Secretary shall provide to the non-Federal spon-
                                                                         9                        sor a written decision on whether the Secretary
                                                                       10                         has the authority under section 216 of the
                                                                       11                         Flood Control Act of 1970 (33 U.S.C. 549a) to
                                                                       12                         undertake the requested feasibility study.
                                                                       13                                  ‘‘(B) RECOMMENDATION.—If the Secretary
                                                                       14                         determines under subparagraph (B) that the
                                                                       15                         Secretary does not have the authority to under-
                                                                       16                         take the requested feasibility study, the Sec-
                                                                       17                         retary shall include the request for a feasibility
                                                                       18                         study in the annual report submitted under sec-
                                                                       19                         tion 7001 of the Water Resources Reform and
                                                                       20                         Development Act of 2014.’’;
                                                                       21                         (2) in subsection (c)—
                                                                       22                                  (A) in the subsection heading, by striking
                                                                       23                         ‘‘LEVEE OWNERS MANUAL’’ and inserting
                                                                       24                         ‘‘ELIGIBILITY’’;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00041   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              42
                                                                         1                                 (B) in paragraph (1), in the heading, by
                                                                         2                        striking ‘‘IN GENERAL’’ and inserting ‘‘LEVEE
                                                                         3                        OWNER’S MANUAL’’;

                                                                         4                                 (C) by redesignating paragraphs (2) and
                                                                         5                        (3) as paragraphs (3) and (4), respectively, and
                                                                         6                        inserting after paragraph (1) the following:
                                                                         7                        ‘‘(2) COMPLIANCE.—
                                                                         8                                 ‘‘(A) IN GENERAL.—Notwithstanding the
                                                                         9                        status of compliance of a non-Federal interest
                                                                       10                         with the requirements of a levee owner’s man-
                                                                       11                         ual described in paragraph (1), or with any
                                                                       12                         other eligibility requirement established by the
                                                                       13                         Secretary related to the maintenance and up-
                                                                       14                         keep responsibilities of the non-Federal interest,
                                                                       15                         the Secretary shall consider the non-Federal in-
                                                                       16                         terest to be eligible for repair and rehabilitation
                                                                       17                         assistance under this section if the non-Federal
                                                                       18                         interest—
                                                                       19                                          ‘‘(i) enters into a written agreement
                                                                       20                                  with the Secretary that identifies any items
                                                                       21                                  of deferred or inadequate maintenance and
                                                                       22                                  upkeep identified by the Secretary prior to
                                                                       23                                  the natural disaster; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00042   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              43
                                                                         1                                         ‘‘(ii) pays, during performance of the
                                                                         2                                 repair and rehabilitation work, all costs to
                                                                         3                                 address—
                                                                         4                                                  ‘‘(I) any items of deferred or in-
                                                                         5                                         adequate maintenance and upkeep
                                                                         6                                         identified by the Secretary; and
                                                                         7                                                  ‘‘(II) any repair or rehabilitation
                                                                         8                                         work necessary to address damage the
                                                                         9                                         Secretary attributes to such deferred
                                                                       10                                          or inadequate maintenance or upkeep.
                                                                       11                                  ‘‘(B) ELIGIBILITY.—The Secretary may
                                                                       12                         only enter into one agreement under subpara-
                                                                       13                         graph (A) with any non-Federal interest.
                                                                       14                                  ‘‘(C) SUNSET.—The authority of the Sec-
                                                                       15                         retary to enter into agreements under para-
                                                                       16                         graph (2) shall terminate on the date that is 5
                                                                       17                         years after the date of enactment of this para-
                                                                       18                         graph.’’; and
                                                                       19                                  (D) in paragraph (3) (as so redesignated),
                                                                       20                         by striking ‘‘this subsection’’ and inserting
                                                                       21                         ‘‘paragraph (1)’’.
                                                                       22      SEC. 122. STUDY ON NATURAL INFRASTRUCTURE AT CORPS

                                                                       23                              OF ENGINEERS PROJECTS.

                                                                       24               (a) DEFINITION OF NATURAL FEATURE AND NA-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25      TURE-BASED FEATURE.—In this section, the terms ‘‘nat-



                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00043   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              44
                                                                         1 ural feature’’ and ‘‘nature-based feature’’ have the mean-
                                                                         2 ings given those terms in section 1184(a) of the Water
                                                                         3 Resources                  Development                  Act        of     2016          (33     U.S.C.
                                                                         4 2289a(a)).
                                                                         5              (b) STUDY.—Not later than 2 years after the date
                                                                         6 of enactment of this Act, the Comptroller General of the
                                                                         7 United States shall conduct, and submit to the Committee
                                                                         8 on Transportation and Infrastructure of the House of
                                                                         9 Representatives and the Committee on Environment and
                                                                       10 Public Works of the Senate, a report on the results of
                                                                       11 a study on the consideration by the Secretary of natural
                                                                       12 infrastructure, natural features, and nature-based fea-
                                                                       13 tures in the study of the feasibility of projects for flood
                                                                       14 risk management, hurricane and storm damage risk re-
                                                                       15 duction, and ecosystem restoration.
                                                                       16               (c) REQUIREMENTS.—The study under subsection
                                                                       17 (b) shall include—
                                                                       18                         (1) a description of guidance or instructions
                                                                       19               issued, and other measures taken, by the Secretary
                                                                       20               to consider natural infrastructure, natural features,
                                                                       21               and nature-based features in project feasibility stud-
                                                                       22               ies;
                                                                       23                         (2) an assessment, based on information from
                                                                       24               relevant Federal and non-Federal sources, of—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00044   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              45
                                                                         1                                 (A) the costs, benefits, and effects associ-
                                                                         2                        ated with natural infrastructure, natural fea-
                                                                         3                        tures, and nature-based features recommended
                                                                         4                        by the Secretary for flood risk management,
                                                                         5                        hurricane and storm damage risk reduction,
                                                                         6                        and ecosystem restoration; and
                                                                         7                                 (B) the effectiveness of natural infrastruc-
                                                                         8                        ture, natural features, and nature-based fea-
                                                                         9                        tures;
                                                                       10                         (3) an analysis of projects for flood risk man-
                                                                       11               agement, hurricane and storm damage risk reduc-
                                                                       12               tion, and ecosystem restoration that have incor-
                                                                       13               porated natural infrastructure, natural features, or
                                                                       14               nature-based features to identify best practices, in-
                                                                       15               cluding for measuring project benefits and costs;
                                                                       16                         (4) a description of any statutory, fiscal, regu-
                                                                       17               latory, or other policy barriers to the appropriate
                                                                       18               consideration and use of a full array of natural in-
                                                                       19               frastructure, natural features, and nature-based fea-
                                                                       20               tures in carrying out feasibility studies and projects;
                                                                       21               and
                                                                       22                         (5) any recommendations for changes to law, or
                                                                       23               to fiscal, regulatory, or other policies, to improve the
                                                                       24               use of natural infrastructure, natural features, and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00045   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              46
                                                                         1              nature-based features by the Corps of Engineers in
                                                                         2              carrying out feasibility studies and projects.
                                                                         3     SEC. 123. REVIEW OF CORPS OF ENGINEERS ASSETS.

                                                                         4              Section 6002 of the Water Resources Reform and De-
                                                                         5 velopment Act of 2014 (128 Stat. 1349) is amended to
                                                                         6 read as follows:
                                                                         7     ‘‘SEC. 6002. REVIEW OF CORPS OF ENGINEERS ASSETS.

                                                                         8              ‘‘(a) ASSESSMENT.—The Secretary shall conduct an
                                                                         9 assessment of projects constructed by the Secretary for
                                                                       10 which the Secretary continues to have financial or oper-
                                                                       11 ational responsibility.
                                                                       12               ‘‘(b) INVENTORY.—Not later than 18 months after
                                                                       13 the date of enactment of the Water Resources Develop-
                                                                       14 ment Act of 2020, the Secretary shall, based on the as-
                                                                       15 sessment carried out under subsection (a), develop an in-
                                                                       16 ventory of projects or portions of projects—
                                                                       17                         ‘‘(1) that are not needed for the missions of the
                                                                       18               Corps of Engineers;
                                                                       19                         ‘‘(2) the modification of which, including
                                                                       20               though the use of natural features or nature-based
                                                                       21               features (as those terms are defined in section
                                                                       22               1184(a) of the Water Resources Development Act of
                                                                       23               2016 (33 U.S.C. 2289a(a)), could improve the sus-
                                                                       24               tainable operations of the project, or reduce oper-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               ation and maintenance costs for the project; or


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00046   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              47
                                                                         1                        ‘‘(3) that are no longer having project purposes
                                                                         2              adequately met by the Corps of Engineers, because
                                                                         3              of deferment of maintenance or other challenges,
                                                                         4              and the divestment of which to a non-Federal entity
                                                                         5              could better meet the local and regional needs for
                                                                         6              operation and maintenance.
                                                                         7              ‘‘(c) CRITERIA.—In conducting the assessment under
                                                                         8 subsection (a) and developing the inventory under sub-
                                                                         9 section (b), the Secretary shall use the following criteria:
                                                                       10                         ‘‘(1) The extent to which the project aligns with
                                                                       11               the current missions of the Corps of Engineers.
                                                                       12                         ‘‘(2) The economic and environmental impacts
                                                                       13               of the project on existing communities in the vicinity
                                                                       14               of the project.
                                                                       15                         ‘‘(3) The extent to which the divestment or
                                                                       16               modification of the project could reduce operation
                                                                       17               and maintenance costs of the Corps of Engineers.
                                                                       18                         ‘‘(4) The extent to which the divestment or
                                                                       19               modification of the project is in the public interest.
                                                                       20                         ‘‘(5) The extent to which investment of addi-
                                                                       21               tional Federal resources in the project proposed for
                                                                       22               divestment or modification, including investment
                                                                       23               needed to bring the project to a good state of repair,
                                                                       24               is in the public interest.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00047   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              48
                                                                         1                        ‘‘(6) The extent to which the authorized pur-
                                                                         2              pose of the project is no longer being met.
                                                                         3              ‘‘(d) RECOMMENDATIONS OF NON-FEDERAL INTER-
                                                                         4     ESTS.—A              non-Federal interest for a project may rec-
                                                                         5 ommend that the Secretary include such project in the as-
                                                                         6 sessment or inventory required under this section.
                                                                         7              ‘‘(e) REPORT TO CONGRESS.—
                                                                         8                        ‘‘(1) IN GENERAL.—Upon completion of the in-
                                                                         9              ventory required by subsection (b), the Secretary
                                                                       10               shall submit to the Committee on Environment and
                                                                       11               Public Works of the Senate and the Committee on
                                                                       12               Transportation and Infrastructure of the House of
                                                                       13               Representatives, and make publicly available, a re-
                                                                       14               port containing the findings of the Secretary with
                                                                       15               respect to the assessment and inventory required
                                                                       16               under this section.
                                                                       17                         ‘‘(2) INCLUSION.—The Secretary shall list in an
                                                                       18               appendix any recommendation of a non-Federal in-
                                                                       19               terest made with respect to a project under sub-
                                                                       20               section (d) that the Secretary determines not to in-
                                                                       21               clude in the inventory developed under subsection
                                                                       22               (b), based on the criteria in subsection (c), including
                                                                       23               information about the request and the reasons for
                                                                       24               the Secretary’s determination.’’.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00048   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              49
                                                                         1     SEC.        124.      SENSE             OF    CONGRESS               ON      MULTIPURPOSE

                                                                         2                             PROJECTS.

                                                                         3              It is the sense of Congress that the Secretary, in co-
                                                                         4 ordination with non-Federal interests, should maximize
                                                                         5 the development, evaluation, and recommendation of
                                                                         6 project alternatives for future water resources develop-
                                                                         7 ment projects that produce multiple project benefits, such
                                                                         8 as navigation, flood risk management, and ecosystem res-
                                                                         9 toration benefits, including through the use of natural or
                                                                       10 nature-based features and the beneficial reuse of dredged
                                                                       11 material.
                                                                       12      SEC. 125. BENEFICIAL REUSE OF DREDGED MATERIAL;

                                                                       13                              DREDGED MATERIAL MANAGEMENT PLANS.

                                                                       14               (a) NATIONAL POLICY ON THE BENEFICIAL REUSE
                                                                       15      OF DREDGED MATERIAL.—

                                                                       16                         (1) IN GENERAL.—It is the policy of the United
                                                                       17               States for the Corps of Engineers to maximize the
                                                                       18               beneficial reuse, in an environmentally acceptable
                                                                       19               manner, of suitable dredged material obtained from
                                                                       20               the construction or operation and maintenance of
                                                                       21               water resources development projects.
                                                                       22                         (2) PLACEMENT OF DREDGED MATERIALS.—
                                                                       23                                  (A) IN GENERAL.—In evaluating the place-
                                                                       24                         ment of dredged material obtained from the




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         construction or operation and maintenance of


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00049   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              50
                                                                         1                        water resources development projects, the Sec-
                                                                         2                        retary shall consider—
                                                                         3                                         (i) the suitability of the dredged mate-
                                                                         4                                 rial for a full range of beneficial uses; and
                                                                         5                                         (ii) the economic and environmental
                                                                         6                                 benefits, efficiencies, and impacts (includ-
                                                                         7                                 ing the effects on living coral) of using the
                                                                         8                                 dredged material for beneficial uses, in-
                                                                         9                                 cluding, in the case of beneficial reuse ac-
                                                                       10                                  tivities that involve more than one water
                                                                       11                                  resources development project, the benefits,
                                                                       12                                  efficiencies, and impacts that result from
                                                                       13                                  the combined activities.
                                                                       14                                  (B) CALCULATION OF FEDERAL STAND-
                                                                       15                         ARD.—The              economic benefits and efficiencies
                                                                       16                         from the beneficial use of dredged material con-
                                                                       17                         sidered by the Secretary under subparagraph
                                                                       18                         (A) shall be included in any determination re-
                                                                       19                         lating to the ‘‘Federal standard’’ by the Sec-
                                                                       20                         retary under section 335.7 of title 33, Code of
                                                                       21                         Federal Regulations for the placement or dis-
                                                                       22                         posal of such material.
                                                                       23               (b) BENEFICIAL USE OF DREDGED MATERIAL.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00050   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              51
                                                                         1                        (1) PILOT PROGRAM PROJECTS.—Section 1122
                                                                         2              of the Water Resources Development Act of 2016
                                                                         3              (33 U.S.C. 2326 note) is amended—
                                                                         4                                 (A) in subsection (b)(1), by striking ‘‘20’’
                                                                         5                        and inserting ‘‘30’’; and
                                                                         6                                 (B) in subsection (g), by striking ‘‘20’’ and
                                                                         7                        inserting ‘‘30’’.
                                                                         8                        (2) SENSE OF CONGRESS.—It is the sense of
                                                                         9              Congress that the Secretary, in selecting projects for
                                                                       10               the beneficial reuse of dredged materials under sec-
                                                                       11               tion 1122 of the Water Resources Development Act
                                                                       12               of 2016 (33 U.S.C. 2326 note), should ensure the
                                                                       13               thorough evaluation of project submissions from
                                                                       14               rural, small, and economically disadvantaged com-
                                                                       15               munities.
                                                                       16               (c) FIVE-YEAR REGIONAL DREDGED MATERIAL
                                                                       17 MANAGEMENT PLANS.—
                                                                       18                         (1) IN GENERAL.—Not later than 1 year after
                                                                       19               the date of enactment of this Act, and annually
                                                                       20               thereafter, the District Commander of each district
                                                                       21               of the Corps of Engineers that obtains dredged ma-
                                                                       22               terial through the construction or operation and
                                                                       23               maintenance of a water resources development
                                                                       24               project shall, at Federal expense, develop and submit



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               to the Secretary a 5-year dredged material manage-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00051   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              52
                                                                         1              ment plan in coordination with relevant State agen-
                                                                         2              cies and stakeholders.
                                                                         3                        (2) SCOPE.—Each plan developed under this
                                                                         4              subsection shall include—
                                                                         5                                 (A) a dredged material budget for each
                                                                         6                        watershed or littoral system within the district;
                                                                         7                                 (B) an estimate of the amount of dredged
                                                                         8                        material likely to be obtained through the con-
                                                                         9                        struction or operation and maintenance of all
                                                                       10                         water resources development projects projected
                                                                       11                         to be carried out within the district during the
                                                                       12                         5-year period following submission of the plan,
                                                                       13                         and the estimated timing for obtaining such
                                                                       14                         dredged material;
                                                                       15                                  (C) an identification of potential water re-
                                                                       16                         sources development projects projected to be
                                                                       17                         carried out within the district during such 5-
                                                                       18                         year period that are suitable for, or that re-
                                                                       19                         quire, the placement of dredged material, and
                                                                       20                         an estimate of the amount of dredged material
                                                                       21                         placement capacity of such projects;
                                                                       22                                  (D) an evaluation of—
                                                                       23                                          (i) the suitability of the dredged mate-
                                                                       24                                  rial for a full range of beneficial uses; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00052   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              53
                                                                         1                                         (ii) the economic and environmental
                                                                         2                                 benefits, efficiencies, and impacts (includ-
                                                                         3                                 ing the effects on living coral) of using the
                                                                         4                                 dredged material for beneficial uses, in-
                                                                         5                                 cluding, in the case of beneficial reuse ac-
                                                                         6                                 tivities that involve more than one water
                                                                         7                                 resources development project, the benefits,
                                                                         8                                 efficiencies, and impacts that result from
                                                                         9                                 the combined activities; and
                                                                       10                                  (E) the district-wide goals for beneficial
                                                                       11                         reuse of the dredged material, including any ex-
                                                                       12                         pected cost savings from aligning and coordi-
                                                                       13                         nating multiple projects (including projects
                                                                       14                         across Corps districts) in the reuse of the
                                                                       15                         dredged material.
                                                                       16                         (3) PUBLIC                COMMENT.—In                    developing each
                                                                       17               plan under this subsection, each District Com-
                                                                       18               mander shall provide notice and an opportunity for
                                                                       19               public comment.
                                                                       20                         (4) PUBLIC AVAILABILITY.—Upon submission
                                                                       21               of each plan to the Secretary under this subsection,
                                                                       22               each District Commander shall make the plan pub-
                                                                       23               licly available, including on a publicly available
                                                                       24               website.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               (d) DREDGE PILOT PROGRAM.—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00053   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              54
                                                                         1                        (1) REVISIONS.—Section 1111 of the Water
                                                                         2              Resources Development Act of 2018 (33 U.S.C.
                                                                         3              2326 note) is amended—
                                                                         4                                 (A) in subsection (a), by striking ‘‘for the
                                                                         5                        operation and maintenance of harbors and in-
                                                                         6                        land harbors’’ and all that follows through the
                                                                         7                        period at the end and inserting the following:
                                                                         8                        ‘‘for the operation and maintenance of—
                                                                         9                        ‘‘(1) harbors and inland harbors referred to in
                                                                       10               section 210(a)(2) of the Water Resources Develop-
                                                                       11               ment Act of 1986 (33 U.S.C. 2238(a)(2)); or
                                                                       12                         ‘‘(2) inland and intracoastal waterways of the
                                                                       13               United States described in section 206 of the Inland
                                                                       14               Waterways Revenue Act of 1978 (33 U.S.C.
                                                                       15               1804).’’; and
                                                                       16                                  (B) in subsection (b), by striking ‘‘or in-
                                                                       17                         land harbors’’ and inserting ‘‘, inland harbors,
                                                                       18                         or inland or intracoastal waterways’’.
                                                                       19                         (2) COORDINATION WITH EXISTING AUTHORI-
                                                                       20               TIES.—The Secretary may carry out the dredge pilot

                                                                       21               program authorized by section 1111 of the Water
                                                                       22               Resources Development Act of 2018 (33 U.S.C.
                                                                       23               2326 note) in coordination with Federal regional
                                                                       24               dredge demonstration programs in effect on the date



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               of enactment of this Act.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00054   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              55
                                                                         1     SEC. 126. AQUATIC ECOSYSTEM RESTORATION FOR ANAD-

                                                                         2                             ROMOUS FISH.

                                                                         3              (a) ANADROMOUS FISH HABITAT AND PASSAGE.—
                                                                         4 Section 206 of the Water Resources Development Act of
                                                                         5 1996 (33 U.S.C. 2330) is amended—
                                                                         6                        (1) in subsection (a), by adding at the end the
                                                                         7              following:
                                                                         8                        ‘‘(3) ANADROMOUS FISH HABITAT AND PAS-
                                                                         9              SAGE.—

                                                                       10                                  ‘‘(A) MEASURES.—A project under this
                                                                       11                         section may include measures to improve habi-
                                                                       12                         tat or passage for anadromous fish, including—
                                                                       13                                          ‘‘(i) installing fish bypass structures
                                                                       14                                  on small water diversions;
                                                                       15                                          ‘‘(ii) modifying tide gates; and
                                                                       16                                          ‘‘(iii)         restoring             or        reconnecting
                                                                       17                                  floodplains and wetlands that are impor-
                                                                       18                                  tant for anadromous fish habitat or pas-
                                                                       19                                  sage.
                                                                       20                                  ‘‘(B) BENEFITS.—A project that includes
                                                                       21                         measures under this paragraph shall be formu-
                                                                       22                         lated to maximize benefits for the anadromous
                                                                       23                         fish species benefitted by the project.’’; and
                                                                       24                         (2) by adding at the end the following:




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               ‘‘(g) PRIORITIZATION.—The Secretary shall give
                                                                       26 projects that include measures described in subsection
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00055   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              56
                                                                         1 (a)(3) equal priority for implementation as other projects
                                                                         2 under this section.’’.
                                                                         3     SEC. 127. ANNUAL REPORT TO CONGRESS.

                                                                         4              Section 7001(c)(4)(B) of the Water Resources Re-
                                                                         5 form and Development Act of 2014 (33 U.S.C.
                                                                         6 2282d(c)(4)(B)) is amended—
                                                                         7                        (1) in clause (i), by striking ‘‘and’’ at the end;
                                                                         8                        (2) by redesignating clause (ii) as clause (iii);
                                                                         9              and
                                                                       10                         (3) by inserting after clause (i) the following:
                                                                       11                                          ‘‘(ii) the Secretary shall not include
                                                                       12                                  proposals in the appendix of the annual re-
                                                                       13                                  port that otherwise meet the criteria for
                                                                       14                                  inclusion in the annual report solely on the
                                                                       15                                  basis that the proposals are for the pur-
                                                                       16                                  poses of navigation, flood risk manage-
                                                                       17                                  ment, ecosystem restoration, or municipal
                                                                       18                                  or agricultural water supply; and’’.
                                                                       19      SEC. 128. HARMFUL ALGAL BLOOM DEMONSTRATION PRO-

                                                                       20                              GRAM.

                                                                       21               (a) IN GENERAL.—The Secretary shall carry out a
                                                                       22 demonstration program to determine the causes of, and
                                                                       23 implement measures to effectively detect, prevent, treat,
                                                                       24 and eliminate, harmful algal blooms associated with water



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 resources development projects.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00056   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              57
                                                                         1              (b) CONSULTATION; USE OF EXISTING DATA AND
                                                                         2 PROGRAM AUTHORITIES.—In carrying out the demonstra-
                                                                         3 tion program under subsection (a), the Secretary shall—
                                                                         4                        (1) consult with the heads of appropriate Fed-
                                                                         5              eral and State agencies; and
                                                                         6                        (2) make maximum use of existing Federal and
                                                                         7              State data and ongoing programs and activities of
                                                                         8              Federal and State agencies, including the activities
                                                                         9              of the Secretary carried out through the Engineer
                                                                       10               Research and Development Center pursuant to sec-
                                                                       11               tion 1109 of the Water Resources Development Act
                                                                       12               of 2018 (33 U.S.C. 610 note).
                                                                       13               (c) FOCUS AREAS.—In carrying out the demonstra-
                                                                       14 tion program under subsection (a), the Secretary shall un-
                                                                       15 dertake program activities related to harmful algal blooms
                                                                       16 in the Great Lakes, the tidal and inland waters of the
                                                                       17 State of New Jersey, the coastal and tidal waters of the
                                                                       18 State of Louisiana, the waterways of the counties that
                                                                       19 comprise the Sacramento-San Joaquin Delta, California,
                                                                       20 and Lake Okeechobee, Florida.
                                                                       21      SEC. 129. UPDATE ON INVASIVE SPECIES POLICY GUID-

                                                                       22                              ANCE.

                                                                       23               (a) IN GENERAL.—The Secretary shall periodically
                                                                       24 update the Invasive Species Policy Guidance, developed



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 under section 104 of the River and Harbor Act of 1958


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00057   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              58
                                                                         1 (33 U.S.C. 610) and the Nonindigenous Aquatic Nuisance
                                                                         2 Prevention and Control Act of 1990 (16 U.S.C. 4701 et
                                                                         3 seq.), in accordance with the most recent National
                                                                         4 Invasive Species Council Management Plan developed pur-
                                                                         5 suant to Executive Order 13112.
                                                                         6              (b) INCLUSION.—The Secretary may include in the
                                                                         7 updated guidance invasive species specific efforts at feder-
                                                                         8 ally authorized water resources development projects lo-
                                                                         9 cated in—
                                                                       10                         (1) high-altitude lakes; and
                                                                       11                         (2) the Tennessee and Cumberland River ba-
                                                                       12               sins.
                                                                       13      SEC. 130. REPORT ON DEBRIS REMOVAL.

                                                                       14               Section 1210 of the Water Resources Development
                                                                       15 Act of 2018 (132 Stat. 3808) is amended to read as fol-
                                                                       16 lows:
                                                                       17      ‘‘SEC. 1210. REPORT ON DEBRIS REMOVAL.

                                                                       18               ‘‘Not later than 180 days after the date of enactment
                                                                       19 of the Water Resources Development Act of 2020, the Sec-
                                                                       20 retary shall submit to Congress and make publicly avail-
                                                                       21 able a report that describes—
                                                                       22                         ‘‘(1) the extent to which, during the 10 fiscal
                                                                       23               years prior to such date of enactment, the Secretary
                                                                       24               has carried out section 3 of the Act of March 2,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               1945 (33 U.S.C. 603a);


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00058   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              59
                                                                         1                        ‘‘(2) how the Secretary has evaluated potential
                                                                         2              work to be carried out under that section; and
                                                                         3                        ‘‘(3) the extent to which the Secretary plans to
                                                                         4              start, continue, or complete debris removal activities
                                                                         5              in the 3 years following submission of the report.’’.
                                                                         6     SEC. 131. MISSOURI RIVER INTERCEPTION-REARING COM-

                                                                         7                             PLEX CONSTRUCTION.

                                                                         8              (a) REPORT.—Not later than 1 year after the date
                                                                         9 of enactment of this Act, and annually thereafter, the Sec-
                                                                       10 retary shall submit to the Committee on Transportation
                                                                       11 and Infrastructure of the House of Representatives and
                                                                       12 the Committee on Environment and Public Works of the
                                                                       13 Senate a report on the effects of any interception-rearing
                                                                       14 complex constructed on the Missouri River on—
                                                                       15                         (1) flood risk management and navigation; and
                                                                       16                         (2) the population recovery of the pallid stur-
                                                                       17               geon, including baseline population counts.
                                                                       18               (b) NO ADDITIONAL IRC CONSTRUCTION.—The Sec-
                                                                       19 retary may not authorize construction of an interception-
                                                                       20 rearing complex on the Missouri River until the Sec-
                                                                       21 retary—
                                                                       22                         (1) submits the report required by subsection
                                                                       23               (a);
                                                                       24                         (2) acting through the Engineer Research and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               Development Center, conducts further research on


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00059   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              60
                                                                         1              interception-rearing complex design, including any
                                                                         2              effects on existing flows, flood risk management, and
                                                                         3              navigation; and
                                                                         4                        (3) develops a plan—
                                                                         5                                 (A) to repair dikes and revetments that are
                                                                         6                        affecting flood risk and bank erosion; and
                                                                         7                                 (B) to establish, repair, or improve water
                                                                         8                        control structures at the headworks of con-
                                                                         9                        structed shallow water habitat side-channels.
                                                                       10               (c) FUTURE IRC CONSTRUCTION.—
                                                                       11                         (1) PUBLIC               COMMENT.—The                     Secretary shall
                                                                       12               provide an opportunity for comment from the public
                                                                       13               and the Governor of each affected State on any pro-
                                                                       14               posals to construct an interception-rearing complex
                                                                       15               after the date of enactment of this Act.
                                                                       16                         (2) PERIOD.—The public comment period re-
                                                                       17               quired by paragraph (1) shall be not less than 90
                                                                       18               days for each proposal to construct an interception-
                                                                       19               rearing complex on the Missouri River.
                                                                       20      SEC. 132. COST AND BENEFIT FEASIBILITY ASSESSMENT.

                                                                       21               (a) IN GENERAL.—Section 5(a)(2)(B) of the Act of
                                                                       22 August 18, 1941 (33 U.S.C. 701n(a)(2)(B)) is amended—
                                                                       23                         (1) in clause (i)(I), by inserting ‘‘, or provide
                                                                       24               contributions equal to,’’ after ‘‘pay’’; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         (2) in clause (ii)—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00060   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              61
                                                                         1                                 (A) in the heading, by inserting ‘‘AND CON-
                                                                         2                        TRIBUTIONS’’ after ‘‘OF PAYMENTS’’;

                                                                         3                                 (B) by inserting ‘‘or contributions’’ after
                                                                         4                        ‘‘Non-Federal payments’’; and
                                                                         5                                 (C) by inserting ‘‘or contributions’’ after
                                                                         6                        ‘‘non-Federal payments’’.
                                                                         7              (b) CONTINUED ELIGIBILITY.—Section 1161(b) of
                                                                         8 the Water Resources Development Act of 2018 (33 U.S.C.
                                                                         9 701n note) is amended—
                                                                       10                         (1) in the matter preceding paragraph (1)—
                                                                       11                                  (A) by striking the ‘‘three fiscal years pre-
                                                                       12                         ceding’’ and inserting ‘‘five fiscal years pre-
                                                                       13                         ceding’’; and
                                                                       14                                  (B) by striking ‘‘last day of the third fiscal
                                                                       15                         year’’ and inserting ‘‘last day of the fifth fiscal
                                                                       16                         year’’;
                                                                       17                         (2) in paragraph (1), by inserting ‘‘, or provide
                                                                       18               contributions equal to,’’ before ‘‘an amount suffi-
                                                                       19               cient’’; and
                                                                       20                         (3) by striking paragraph (2) and inserting the
                                                                       21               following:
                                                                       22                         ‘‘(2) the Secretary determines that the damage
                                                                       23               to the structure was not as a result of negligent op-
                                                                       24               eration or maintenance.’’.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00061   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              62
                                                                         1     SEC. 133. MATERIALS, SERVICES, AND FUNDS FOR REPAIR,

                                                                         2                             RESTORATION,                    OR        REHABILITATION            OF

                                                                         3                             PROJECTS.

                                                                         4              (a) IN GENERAL.—In any area covered by an emer-
                                                                         5 gency or major disaster declaration declared under the
                                                                         6 Robert T. Stafford Disaster Relief and Emergency Assist-
                                                                         7 ance Act (42 U.S.C. 5121 et seq.), the Secretary is au-
                                                                         8 thorized to accept and use materials, services, and funds,
                                                                         9 during the period the declaration is in effect, from a non-
                                                                       10 Federal interest or private entity to repair, restore, or re-
                                                                       11 habilitate a federally authorized water resources develop-
                                                                       12 ment project, and to provide reimbursement to such non-
                                                                       13 Federal interest or private entity for such materials, serv-
                                                                       14 ices, and funds, in the Secretary’s sole discretion, and sub-
                                                                       15 ject to the availability of appropriations, if the Secretary
                                                                       16 determines that reimbursement is in the public interest.
                                                                       17               (b) ADDITIONAL REQUIREMENT.—The Secretary
                                                                       18 may only reimburse for the use of materials or services
                                                                       19 accepted under this section if such materials or services
                                                                       20 meet the Secretary’s specifications and comply with all ap-
                                                                       21 plicable laws and regulations that would apply if such ma-
                                                                       22 terials and services were acquired by the Secretary, includ-
                                                                       23 ing sections 3141 through 3148 and 3701 through 3708
                                                                       24 of title 40, United States Code, section 8302 of title 41,




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 United States Code, and the National Environmental Pol-
                                                                       26 icy Act of 1969.
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00062   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              63
                                                                         1              (c) AGREEMENTS.—
                                                                         2                        (1) IN GENERAL.—Prior to the acceptance of
                                                                         3              materials, services, or funds under this section, the
                                                                         4              Secretary and the non-Federal interest or private
                                                                         5              entity shall enter into an agreement that specifies—
                                                                         6                                 (A) the non-Federal interest or private en-
                                                                         7                        tity shall hold and save the United States free
                                                                         8                        from any and all damages that arise from use
                                                                         9                        of materials or services of the non-Federal in-
                                                                       10                         terest or private entity, except for damages due
                                                                       11                         to the fault or negligence of the United States
                                                                       12                         or its contractors;
                                                                       13                                  (B) the non-Federal interest or private en-
                                                                       14                         tity shall certify that the materials or services
                                                                       15                         comply with all applicable laws and regulations
                                                                       16                         under subsection (b); and
                                                                       17                                  (C) any other term or condition required
                                                                       18                         by the Secretary.
                                                                       19                         (2) EXCEPTION.—If an agreement under para-
                                                                       20               graph (1) was not entered prior to materials or serv-
                                                                       21               ices being contributed, a non-Federal interest or pri-
                                                                       22               vate entity shall enter into an agreement with the
                                                                       23               Secretary that—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00063   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              64
                                                                         1                                 (A) specifies the value, as determined by
                                                                         2                        the Secretary, of those materials or services
                                                                         3                        contributed and eligible for reimbursement; and
                                                                         4                                 (B) ensures that the materials or services
                                                                         5                        comply with subsection (b) and paragraph (1).
                                                                         6     SEC. 134. LEVEE SAFETY.

                                                                         7              Section 9004 of the Water Resources Development
                                                                         8 Act of 2007 (33 U.S.C. 3303) is amended by adding at
                                                                         9 the end the following:
                                                                       10               ‘‘(d) IDENTIFICATION OF DEFICIENCIES.—
                                                                       11                         ‘‘(1) IN GENERAL.—For each levee included in
                                                                       12               an inventory established under subsection (b) or for
                                                                       13               which the Secretary has conducted a review under
                                                                       14               subsection (c), the Secretary shall—
                                                                       15                                  ‘‘(A) identify the specific engineering and
                                                                       16                         maintenance deficiencies, if any; and
                                                                       17                                  ‘‘(B) describe the recommended remedies
                                                                       18                         to correct each deficiency identified under sub-
                                                                       19                         paragraph (A), and, if requested by owner of a
                                                                       20                         non-Federal levee, the associated costs of those
                                                                       21                         remedies.
                                                                       22                         ‘‘(2)       CONSULTATION.—In                           identifying       defi-
                                                                       23               ciencies and describing remedies for a levee under
                                                                       24               paragraph (1), the Secretary shall consult with rel-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               evant non-Federal interests, including by providing


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00064   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              65
                                                                         1              an opportunity for comment by those non-Federal
                                                                         2              interests.’’.
                                                                         3     SEC. 135. NATIONAL DAM SAFETY PROGRAM.

                                                                         4              (a) DEFINITIONS.—Section 2 of the National Dam
                                                                         5 Safety Program Act (33 U.S.C. 467) is amended—
                                                                         6                        (1) in paragraph (4)—
                                                                         7                                 (A) in subparagraph (A)—
                                                                         8                                         (i) by striking clause (iii) and insert-
                                                                         9                                 ing the following:
                                                                       10                                          ‘‘(iii) has an emergency action plan
                                                                       11                                  that—
                                                                       12                                                   ‘‘(I) is approved by the relevant
                                                                       13                                          State dam safety agency; or
                                                                       14                                                   ‘‘(II) is in conformance with
                                                                       15                                          State law and pending approval by the
                                                                       16                                          relevant State dam safety agency;’’;
                                                                       17                                          and
                                                                       18                                          (ii) by striking clause (iv) and insert-
                                                                       19                                  ing the following:
                                                                       20                                          ‘‘(iv) fails to meet minimum dam safe-
                                                                       21                                  ty standards of the State in which the dam
                                                                       22                                  is located, as determined by the State; and
                                                                       23                                          ‘‘(v) poses an unacceptable risk to the
                                                                       24                                  public, as determined by the Adminis-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00065   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              66
                                                                         1                                 trator, in consultation with the Board.’’;
                                                                         2                                 and
                                                                         3                                 (B) in subparagraph (B)(i), by inserting
                                                                         4                        ‘‘under a hydropower project with an authorized
                                                                         5                        installed            capacity           of        greater          than   1.5
                                                                         6                        megawatts’’ after ‘‘dam’’; and
                                                                         7                        (2) in paragraph (10)—
                                                                         8                                 (A) in the heading, by striking ‘‘NON-FED-
                                                                         9                        ERAL SPONSOR’’ and inserting ‘‘ELIGIBLE SUB-

                                                                       10                         RECIPIENT’’; and

                                                                       11                                  (B) by striking ‘‘The term ‘non-Federal
                                                                       12                         sponsor’ ’’ and inserting ‘‘The term ‘eligible
                                                                       13                         subrecipient’ ’’.
                                                                       14               (b) REHABILITATION OF HIGH HAZARD POTENTIAL
                                                                       15 DAMS.—
                                                                       16                         (1) ESTABLISHMENT                           OF      PROGRAM.—Section

                                                                       17               8A(a) of the National Dam Safety Program Act (33
                                                                       18               U.S.C. 467f–2(a)) is amended by striking ‘‘to non-
                                                                       19               Federal sponsors’’ and inserting ‘‘to States with
                                                                       20               dam safety programs’’.
                                                                       21                         (2) ELIGIBLE ACTIVITIES.—Section 8A(b) of
                                                                       22               the National Dam Safety Program Act (33 U.S.C.
                                                                       23               467f–2(b)) is amended, in the matter preceding
                                                                       24               paragraph (1), by striking ‘‘for a project may be



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               used for’’ and inserting ‘‘to a State may be used by


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00066   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              67
                                                                         1              the State to award grants to eligible subrecipients
                                                                         2              for’’.
                                                                         3                        (3) AWARD OF GRANTS.—Section 8A(c) of the
                                                                         4              National Dam Safety Program Act (33 U.S.C.
                                                                         5              467f–2(c)) is amended—
                                                                         6                                 (A) in paragraph (1)(A), by striking ‘‘non-
                                                                         7                        Federal sponsor’’ and inserting ‘‘State’’; and
                                                                         8                                 (B) in paragraph (2)—
                                                                         9                                         (i) in subparagraph (A), by striking
                                                                       10                                  ‘‘an eligible high hazard potential dam to
                                                                       11                                  a non-Federal sponsor’’ and inserting ‘‘eli-
                                                                       12                                  gible high hazard potential dams to a
                                                                       13                                  State’’;
                                                                       14                                          (ii) in subparagraph (B)—
                                                                       15                                                   (I) in the subparagraph heading,
                                                                       16                                          by striking ‘‘PROJECT GRANT’’ and in-
                                                                       17                                          serting ‘‘GRANT’’;
                                                                       18                                                   (II) by striking ‘‘project grant
                                                                       19                                          agreement with the non-Federal spon-
                                                                       20                                          sor’’ and inserting ‘‘grant agreement
                                                                       21                                          with the State’’; and
                                                                       22                                                   (III) by striking ‘‘project,’’ and
                                                                       23                                          inserting ‘‘projects for which the
                                                                       24                                          grant is awarded,’’;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00067   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              68
                                                                         1                                         (iii) by amending subparagraph (C) to
                                                                         2                                 read as follows:
                                                                         3                                 ‘‘(C) GRANT ASSURANCE.—As part of a
                                                                         4                        grant agreement under subparagraph (B), the
                                                                         5                        Administrator shall require that each eligible
                                                                         6                        subrecipient to which the State awards a grant
                                                                         7                        under this section provides an assurance, with
                                                                         8                        respect to the dam to be rehabilitated by the el-
                                                                         9                        igible subrecipient, that the dam owner will
                                                                       10                         carry out a plan for maintenance of the dam
                                                                       11                         during the expected life of the dam.’’; and
                                                                       12                                          (iv) in subparagraph (D), by striking
                                                                       13                                  ‘‘A grant provided under this section shall
                                                                       14                                  not exceed’’ and inserting ‘‘A State may
                                                                       15                                  not award a grant to an eligible sub-
                                                                       16                                  recipient under this section that exceeds,
                                                                       17                                  for any 1 dam,’’.
                                                                       18                         (4) REQUIREMENTS.—Section 8A(d) of the Na-
                                                                       19               tional Dam Safety Program Act (33 U.S.C. 467f–
                                                                       20               2(d)) is amended—
                                                                       21                                  (A) in paragraph (1), by inserting ‘‘to an
                                                                       22                         eligible subrecipient’’ after ‘‘this section’’;
                                                                       23                                  (B) in paragraph (2)—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00068   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              69
                                                                         1                                         (i) in the paragraph heading, by strik-
                                                                         2                                 ing ‘‘NON-FEDERAL SPONSOR’’ and insert-
                                                                         3                                 ing ‘‘ELIGIBLE SUBRECIPIENT’’;
                                                                         4                                         (ii) in the matter preceding subpara-
                                                                         5                                 graph (A), by striking ‘‘the non-Federal
                                                                         6                                 sponsor shall’’ and inserting ‘‘an eligible
                                                                         7                                 subrecipient shall, with respect to the dam
                                                                         8                                 to be rehabilitated by the eligible sub-
                                                                         9                                 recipient’’;
                                                                       10                                          (iii) by amending subparagraph (A) to
                                                                       11                                  read as follows:
                                                                       12                                  ‘‘(A) demonstrate that the community in
                                                                       13                         which the dam is located participates in, and
                                                                       14                         complies with, all applicable Federal flood in-
                                                                       15                         surance programs, including demonstrating that
                                                                       16                         such community is participating in the National
                                                                       17                         Flood Insurance Program, and is not on proba-
                                                                       18                         tion, suspended, or withdrawn from such Pro-
                                                                       19                         gram;’’;
                                                                       20                                          (iv) in subparagraph (B), by striking
                                                                       21                                  ‘‘have’’ and inserting ‘‘beginning not later
                                                                       22                                  than 2 years after the date on which the
                                                                       23                                  Administrator publishes criteria for hazard
                                                                       24                                  mitigation plans under paragraph (3),



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  demonstrate that the Tribal or local gov-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00069   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              70
                                                                         1                                 ernment with jurisdiction over the area in
                                                                         2                                 which the dam is located has’’; and
                                                                         3                                         (v) in subparagraph (C), by striking
                                                                         4                                 ‘‘50-year period’’ and inserting ‘‘expected
                                                                         5                                 life of the dam’’; and
                                                                         6                                 (C) by adding at the end the following:
                                                                         7                        ‘‘(3) HAZARD MITIGATION PLAN CRITERIA.—
                                                                         8              Not later than 1 year after the date of enactment
                                                                         9              of this paragraph, the Administrator, in consultation
                                                                       10               with the Board, shall publish criteria for hazard
                                                                       11               mitigation plans required under paragraph (2)(B).’’.
                                                                       12                         (5) FLOODPLAIN MANAGEMENT PLANS.—Sec-
                                                                       13               tion 8A(e) of the National Dam Safety Program Act
                                                                       14               (33 U.S.C. 467f–2(e)) is amended—
                                                                       15                                  (A) in paragraph (1)—
                                                                       16                                          (i) in the matter preceding subpara-
                                                                       17                                  graph (A), by striking ‘‘the non-Federal
                                                                       18                                  sponsor’’ and inserting ‘‘an eligible sub-
                                                                       19                                  recipient’’; and
                                                                       20                                          (ii) in subparagraph (B), by striking
                                                                       21                                  ‘‘1 year’’ and inserting ‘‘2 years’’ each
                                                                       22                                  place it appears; and
                                                                       23                                  (B) by striking paragraph (3) and insert-
                                                                       24                         ing the following:



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00070   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              71
                                                                         1                        ‘‘(3) PLAN              CRITERIA             AND       TECHNICAL         SUP-

                                                                         2              PORT.—The Administrator, in consultation with the

                                                                         3              Board, shall provide criteria, and may provide tech-
                                                                         4              nical support, for the development and implementa-
                                                                         5              tion of floodplain management plans prepared under
                                                                         6              this subsection.’’.
                                                                         7                        (6) CONTRACTUAL                         REQUIREMENTS.—Section

                                                                         8              8A(i)(1) of the National Dam Safety Program Act
                                                                         9              (33 U.S.C. 467f–2(i)(1)) is amended by striking ‘‘a
                                                                       10               non-Federal sponsor’’ and inserting ‘‘an eligible sub-
                                                                       11               recipient’’.
                                                                       12      SEC. 136. REHABILITATION OF CORPS OF ENGINEERS CON-

                                                                       13                              STRUCTED PUMP STATIONS.

                                                                       14               (a) DEFINITIONS.—In this section:
                                                                       15                         (1) ELIGIBLE PUMP STATION.—The term ‘‘eli-
                                                                       16               gible pump station’’ means a pump station—
                                                                       17                                  (A) constructed, in whole or in part, by the
                                                                       18                         Corps of Engineers for flood risk management
                                                                       19                         purposes;
                                                                       20                                  (B) that the Secretary has identified as
                                                                       21                         having a major deficiency; and
                                                                       22                                  (C) the failure of which the Secretary has
                                                                       23                         determined would impair the function of a flood
                                                                       24                         risk management project constructed by the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         Corps of Engineers.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00071   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              72
                                                                         1                        (2) REHABILITATION.—
                                                                         2                                 (A) IN GENERAL.—The term ‘‘rehabilita-
                                                                         3                        tion’’, with respect to an eligible pump station,
                                                                         4                        means to address a major deficiency of the eli-
                                                                         5                        gible pump station caused by long-term deg-
                                                                         6                        radation of the foundation, construction mate-
                                                                         7                        rials, or engineering systems or components of
                                                                         8                        the eligible pump station.
                                                                         9                                 (B) INCLUSIONS.—The term ‘‘rehabilita-
                                                                       10                         tion’’, with respect to an eligible pump station,
                                                                       11                         includes—
                                                                       12                                          (i) the incorporation into the eligible
                                                                       13                                  pump station of—
                                                                       14                                                   (I) current design standards;
                                                                       15                                                   (II) efficiency improvements; and
                                                                       16                                                   (III) associated drainage; and
                                                                       17                                          (ii) increasing the capacity of the eli-
                                                                       18                                  gible pump station, subject to the condition
                                                                       19                                  that the increase shall—
                                                                       20                                                   (I) significantly decrease the risk
                                                                       21                                          of loss of life and property damage; or
                                                                       22                                                   (II) decrease total lifecycle reha-
                                                                       23                                          bilitation costs for the eligible pump
                                                                       24                                          station.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00072   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              73
                                                                         1              (b) AUTHORIZATION.—The Secretary may carry out
                                                                         2 rehabilitation of an eligible pump station, if the Secretary
                                                                         3 determines that the rehabilitation is feasible.
                                                                         4              (c) COST SHARING.—The non-Federal interest for
                                                                         5 the eligible pump station shall—
                                                                         6                        (1) provide 35 percent of the cost of rehabilita-
                                                                         7              tion of an eligible pump station carried out under
                                                                         8              this section; and
                                                                         9                        (2) provide all land, easements, rights-of-way,
                                                                       10               and necessary relocations associated with the reha-
                                                                       11               bilitation described in subparagraph (A), at no cost
                                                                       12               to the Federal Government.
                                                                       13               (d) AGREEMENT REQUIRED.—The rehabilitation of
                                                                       14 an eligible pump station pursuant to this section shall be
                                                                       15 initiated only after a non-Federal interest has entered into
                                                                       16 a binding agreement with the Secretary—
                                                                       17                         (1) to pay the non-Federal share of the costs of
                                                                       18               rehabilitation under subsection (c); and
                                                                       19                         (2) to pay 100 percent of the operation and
                                                                       20               maintenance costs of the rehabilitated eligible pump
                                                                       21               station, in accordance with regulations promulgated
                                                                       22               by the Secretary.
                                                                       23               (e) TREATMENT.—The rehabilitation of an eligible
                                                                       24 pump station pursuant to this section shall not be consid-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 ered to be a separable element of the associated flood risk


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00073   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              74
                                                                         1 management project constructed by the Corps of Engi-
                                                                         2 neers.
                                                                         3              (f) AUTHORIZATION OF APPROPRIATIONS.—There is
                                                                         4 authorized to be appropriated to carry out this section
                                                                         5 $60,000,000, to remain available until expended.
                                                                         6     SEC.        137.       NON-FEDERAL                   PROJECT             IMPLEMENTATION

                                                                         7                             PILOT PROGRAM.

                                                                         8              Section 1043(b) of the Water Resources Reform and
                                                                         9 Development Act of 2014 (33 U.S.C. 2201 note) is
                                                                       10 amended—
                                                                       11                         (1) in paragraph (7), by striking ‘‘the date that
                                                                       12               is 5 years after the date of enactment of this Act’’
                                                                       13               and inserting ‘‘September 30, 2026’’;
                                                                       14                         (2) in paragraph (8), by striking ‘‘2023’’ and
                                                                       15               inserting ‘‘2026’’; and
                                                                       16                         (3) by adding at the end the following:
                                                                       17                         ‘‘(9) IMPLEMENTATION GUIDANCE.—
                                                                       18                                  ‘‘(A) IN GENERAL.—Not later than 120
                                                                       19                         days after the date of enactment of this para-
                                                                       20                         graph, the Secretary shall issue guidance for
                                                                       21                         the implementation of the pilot program that,
                                                                       22                         to the extent practicable, identifies—
                                                                       23                                          ‘‘(i) the metrics for measuring the
                                                                       24                                  success of the pilot program;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00074   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              75
                                                                         1                                         ‘‘(ii) a process for identifying future
                                                                         2                                 projects to participate in the pilot pro-
                                                                         3                                 gram;
                                                                         4                                         ‘‘(iii) measures to address the risks of
                                                                         5                                 a      non-Federal                   interest           constructing
                                                                         6                                 projects under the pilot program, including
                                                                         7                                 which entity bears the risk for projects
                                                                         8                                 that fail to meet the Corps of Engineers
                                                                         9                                 standards for design or quality;
                                                                       10                                          ‘‘(iv) the laws and regulations that a
                                                                       11                                  non-Federal interest must follow in car-
                                                                       12                                  rying out a project under the pilot pro-
                                                                       13                                  gram; and
                                                                       14                                          ‘‘(v) which entity bears the risk in the
                                                                       15                                  event that a project carried out under the
                                                                       16                                  pilot program fails to be carried out in ac-
                                                                       17                                  cordance with the project authorization or
                                                                       18                                  this subsection.
                                                                       19                                  ‘‘(B) NEW PROJECT PARTNERSHIP AGREE-
                                                                       20                         MENTS.—The                Secretary may not enter into a
                                                                       21                         project partnership agreement under this sub-
                                                                       22                         section during the period beginning on the date
                                                                       23                         of enactment of this paragraph and ending on
                                                                       24                         the date on which the Secretary issues the guid-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         ance under subparagraph (A).’’.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00075   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              76
                                                                         1     SEC. 138. DEFINITION OF ECONOMICALLY DISADVANTAGED

                                                                         2                             COMMUNITY.

                                                                         3              (a) IN GENERAL.—Not later than 180 days after the
                                                                         4 date of enactment of this Act, the Secretary shall issue
                                                                         5 guidance defining the term ‘‘economically disadvantaged
                                                                         6 community’’ for the purposes of this Act and the amend-
                                                                         7 ments made by this Act.
                                                                         8              (b) CONSIDERATIONS.—In defining the term ‘‘eco-
                                                                         9 nomically disadvantaged community’’ under subsection
                                                                       10 (a), the Secretary shall, to the maximum extent prac-
                                                                       11 ticable, utilize the criteria under paragraphs (1) or (2) of
                                                                       12 section 301(a) of the Public Works and Economic Devel-
                                                                       13 opment Act of 1965 (42 U.S.C. 3161), to the extent that
                                                                       14 such criteria are applicable in relation to the development
                                                                       15 of water resources development projects.
                                                                       16               (c) PUBLIC COMMENT.—In developing the guidance
                                                                       17 under subsection (a), the Secretary shall provide notice
                                                                       18 and an opportunity for public comment.
                                                                       19      SEC. 139. COST SHARING PROVISIONS FOR TERRITORIES

                                                                       20                              AND INDIAN TRIBES.

                                                                       21               Section 1156(b) of the Water Resources Development
                                                                       22 Act of 1986 (33 U.S.C. 2310(b)) is amended by striking
                                                                       23 ‘‘for inflation’’ and all that follows through the period at
                                                                       24 the end and inserting ‘‘on an annual basis for inflation.’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00076   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              77
                                                                         1     SEC. 140. FLOOD CONTROL AND OTHER PURPOSES.

                                                                         2              Section 103(k) of the Water Resources Development
                                                                         3 Act of 1986 (33 U.S.C. 2213) is amended—
                                                                         4                        (1) by striking ‘‘Except as’’ and inserting the
                                                                         5              following:
                                                                         6                        ‘‘(1) IN GENERAL.—Except as’’; and
                                                                         7                        (2) by adding at the end the following:
                                                                         8                        ‘‘(2) RENEGOTIATION OF TERMS.—
                                                                         9                                 ‘‘(A) IN GENERAL.—At the request of a
                                                                       10                         non-Federal interest, the Secretary and the
                                                                       11                         non-Federal interest may renegotiate the terms
                                                                       12                         and conditions of an eligible deferred payment,
                                                                       13                         including—
                                                                       14                                          ‘‘(i) permitting the non-Federal con-
                                                                       15                                  tribution to be made without interest, pur-
                                                                       16                                  suant to paragraph (1);
                                                                       17                                          ‘‘(ii) recalculation of the interest rate;
                                                                       18                                          ‘‘(iii) full or partial forgiveness of in-
                                                                       19                                  terest accrued during the period of con-
                                                                       20                                  struction; and
                                                                       21                                          ‘‘(iv) a credit against construction in-
                                                                       22                                  terest for a non-Federal investment that
                                                                       23                                  benefits the completion or performance of
                                                                       24                                  the project or separable element.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00077   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              78
                                                                         1                                 ‘‘(B) ELIGIBLE DEFERRED PAYMENT.—An
                                                                         2                        eligible deferred payment agreement under sub-
                                                                         3                        paragraph (A) is an agreement for which—
                                                                         4                                         ‘‘(i) the non-Federal contribution was
                                                                         5                                 made with interest;
                                                                         6                                         ‘‘(ii) the period of project construction
                                                                         7                                 exceeds 10 years from the execution of a
                                                                         8                                 project partnership agreement or appro-
                                                                         9                                 priation of funds; and
                                                                       10                                          ‘‘(iii) the construction interest exceeds
                                                                       11                                  $45,000,000.
                                                                       12                                  ‘‘(C) CREDIT                 FOR        NON-FEDERAL             CON-

                                                                       13                         TRIBUTION.—

                                                                       14                                          ‘‘(i) IN GENERAL.—The Secretary is
                                                                       15                                  authorized to credit any costs incurred by
                                                                       16                                  the non-Federal interest (including in-kind
                                                                       17                                  contributions) to remedy a design or con-
                                                                       18                                  struction deficiency of a covered project or
                                                                       19                                  separable element toward the non-Federal
                                                                       20                                  share of the cost of the covered project, if
                                                                       21                                  the Secretary determines the remedy to be
                                                                       22                                  integral to the completion or performance
                                                                       23                                  of the covered project.
                                                                       24                                          ‘‘(ii) CREDIT OF COSTS.—If the non-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  Federal interest incurs costs or in-kind


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00078   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              79
                                                                         1                                 contributions for a project to remedy a de-
                                                                         2                                 sign or construction deficiency of a project
                                                                         3                                 or separable element which has a 100 per-
                                                                         4                                 cent Federal cost share, and the Secretary
                                                                         5                                 determines the remedy to be integral to the
                                                                         6                                 completion or performance of the project,
                                                                         7                                 the Secretary is authorized to credit such
                                                                         8                                 costs to any interest accrued on a deferred
                                                                         9                                 non-Federal contribution.’’.
                                                                       10      SEC. 141. REVIEW OF CONTRACTING POLICIES.

                                                                       11               (a) IN GENERAL.—Not later than 180 days after the
                                                                       12 date of enactment of this section, the Secretary shall com-
                                                                       13 plete a review of the policies, guidelines, and regulations
                                                                       14 of the Corps of Engineers for the development of contrac-
                                                                       15 tual agreements between the Secretary and non-Federal
                                                                       16 interests and utilities associated with the construction of
                                                                       17 water resources development projects.
                                                                       18               (b) REPORT.—Not later than 90 days after com-
                                                                       19 pleting the review under subsection (a), the Secretary shall
                                                                       20 submit to the Committee on Transportation and Infra-
                                                                       21 structure of the House of Representatives and the Com-
                                                                       22 mittee on Environment and Public Works of the Senate,
                                                                       23 and make publicly available, a report that includes—
                                                                       24                         (1) a summary of the results of the review; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00079   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              80
                                                                         1                        (2) public guidance on best practices for non-
                                                                         2              Federal interest to use when writing or developing
                                                                         3              contractual agreements with the Secretary and utili-
                                                                         4              ties.
                                                                         5              (c) PROVISION OF GUIDANCE.—The Secretary shall
                                                                         6 provide the best practices guidance included under sub-
                                                                         7 section (b)(2) to non-Federal interests prior to the devel-
                                                                         8 opment of contractual agreements.
                                                                         9     SEC. 142. BUY AMERICA.

                                                                       10               With respect to all Corps of Engineers construction
                                                                       11 and rehabilitation contracts to be awarded after the date
                                                                       12 of enactment of this Act, the steel components furnished
                                                                       13 and delivered under such contracts shall be manufactured
                                                                       14 or fabricated in whole or substantial part in the United
                                                                       15 States with steel produced or made in the United States,
                                                                       16 its territories, or possessions.
                                                                       17      SEC. 143. ANNUAL REPORT ON STATUS OF FEASIBILITY

                                                                       18                              STUDIES.

                                                                       19               Concurrent with each report submitted under section
                                                                       20 7001 of the Water Resources Reform and Development
                                                                       21 Act of 2014 (33 U.S.C. 2282d), the Secretary shall submit
                                                                       22 to the Committee on Transportation and Infrastructure
                                                                       23 of the House of Representatives and the Committee on
                                                                       24 Environment and Public Works a report that provides for



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 an accounting of all outstanding feasibility studies being


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00080   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              81
                                                                         1 conducted by the Secretary, including, for each such
                                                                         2 study, its length, cost, and expected completion date.
                                                                         3                      TITLE II—STUDIES AND
                                                                         4                             REPORTS
                                                                         5     SEC. 201. AUTHORIZATION OF PROPOSED FEASIBILITY

                                                                         6                             STUDIES.

                                                                         7              (a) IN GENERAL.—The Secretary is authorized to
                                                                         8 conduct a feasibility study for the following projects for
                                                                         9 water resources development and conservation and other
                                                                       10 purposes, as identified in the reports titled ‘‘Report to
                                                                       11 Congress on Future Water Resources Development’’ sub-
                                                                       12 mitted to Congress pursuant to section 7001 of the Water
                                                                       13 Resources Reform and Development Act of 2014 (33
                                                                       14 U.S.C. 2282d) or otherwise reviewed by Congress:
                                                                       15                         (1) TONTO CREEK, GILA RIVER, ARIZONA.—
                                                                       16               Project for flood risk management, Tonto Creek,
                                                                       17               Gila River, Arizona.
                                                                       18                         (2) SULPHUR RIVER, ARKANSAS AND TEXAS.—
                                                                       19               Project for ecosystem restoration, Sulphur River,
                                                                       20               Arkansas and Texas.
                                                                       21                         (3) CABLE CREEK, CALIFORNIA.—Project for
                                                                       22               flood risk management, water supply, and related
                                                                       23               benefits, Cable Creek, California.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00081   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              82
                                                                         1                        (4) DEL MAR BLUFFS, CALIFORNIA.—Project
                                                                         2              for shoreline stabilization, Del Mar Bluffs, San
                                                                         3              Diego County, California.
                                                                         4                        (5) REDBANK AND FANCHER CREEKS, CALI-
                                                                         5              FORNIA.—Project for water conservation and water

                                                                         6              supply, Redbank and Fancher Creeks, California.
                                                                         7                        (6) RIO              HONDO           CHANNEL,               CALIFORNIA.—

                                                                         8              Project for ecosystem restoration, Rio Hondo Chan-
                                                                         9              nel, San Gabriel River, California.
                                                                       10                         (7) SOUTHERN                     CALIFORNIA,                CALIFORNIA.—

                                                                       11               Project for coastal storm damage reduction, South-
                                                                       12               ern California.
                                                                       13                         (8) SHINGLE CREEK AND KISSIMMEE RIVER,
                                                                       14               FLORIDA.—Project                      for ecosystem restoration and
                                                                       15               water storage, Shingle Creek and Kissimmee River,
                                                                       16               Osceola County, Florida.
                                                                       17                         (9) ST. JOHN’S RIVER AND LAKE JESUP, FLOR-
                                                                       18               IDA.—Project for ecosystem restoration, St. John’s

                                                                       19               River and Lake Jesup, Florida.
                                                                       20                         (10) WAIMEA                     RIVER,         HAWAII.—Project           for
                                                                       21               flood risk management, Waimea River, Kauai, Ha-
                                                                       22               waii.
                                                                       23                         (11) CHICAGO AREA WATERWAYS SYSTEM, ILLI-
                                                                       24               NOIS.—Project for ecosystem restoration, recreation,




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               and other purposes, Illinois River, Chicago River,


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00082   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              83
                                                                         1              Calumet River, Grand Calumet River, Little Cal-
                                                                         2              umet River, and other waterways in the vicinity of
                                                                         3              Chicago, Illinois.
                                                                         4                        (12) FOX RIVER, ILLINOIS.—Project for flood
                                                                         5              risk management, Fox River, Illinois.
                                                                         6                        (13)        LOWER               MISSOURI            RIVER,         KANSAS.—

                                                                         7              Project for bank stabilization and navigation, Lower
                                                                         8              Missouri River, Sioux City, Kansas.
                                                                         9                        (14)         TANGIPAHOA                     PARISH,              LOUISIANA.—

                                                                       10               Project for flood risk management, Tangipahoa Par-
                                                                       11               ish, Louisiana.
                                                                       12                         (15) KENT               NARROWS AND CHESTER RIVER,

                                                                       13               MARYLAND.—Project for navigation, Kent Narrows

                                                                       14               and Chester River, Queen Anne’s County, Maryland.
                                                                       15                         (16) BOSTON,                    MASSACHUSETTS.—Project                   for
                                                                       16               hurricane and storm damage risk reduction, Boston,
                                                                       17               Massachusetts, pursuant to the comprehensive study
                                                                       18               authorized under the Disaster Relief Appropriations
                                                                       19               Act, 2013 (Public Law 113–2).
                                                                       20                         (17) LOWER ST. CROIX RIVER, MINNESOTA.—
                                                                       21               Project for flood risk management, ecosystem res-
                                                                       22               toration, and recreation, Lower St. Croix River,
                                                                       23               Minnesota.
                                                                       24                         (18) ESCATAWPA RIVER BASIN, MISSISSIPPI.—



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               Project for flood risk management and ecosystem


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00083   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              84
                                                                         1              restoration, Escatawpa River, Jackson County, Mis-
                                                                         2              sissippi.
                                                                         3                        (19) LONG BEACH, BAY ST. LOUIS AND MIS-
                                                                         4              SISSIPPI SOUND, MISSISSIPPI.—Project for hurricane

                                                                         5              and storm damage risk reduction and flood risk
                                                                         6              management, Long Beach, Bay St. Louis and Mis-
                                                                         7              sissippi Sound, Mississippi.
                                                                         8                        (20) PASCAGOULA RIVER BASIN, MISSISSIPPI.—
                                                                         9              Project             for        comprehensive                   watershed            study,
                                                                       10               Pascagoula, Mississippi.
                                                                       11                         (21) TALLAHOMA                       AND        TALLAHALA                CREEKS,

                                                                       12               MISSISSIPPI.—Project                        for flood risk management,
                                                                       13               Leaf River, Jones County, Mississippi.
                                                                       14                         (22) LOWER OSAGE RIVER BASIN, MISSOURI.—
                                                                       15               Project for ecosystem restoration, Lower Osage
                                                                       16               River Basin, Missouri.
                                                                       17                         (23) UPPER BASIN AND STONY BROOK (GREEN
                                                                       18               BROOK SUB-BASIN), RARITAN RIVER BASIN, NEW

                                                                       19               JERSEY.—Reevaluation                           of the Upper Basin and
                                                                       20               Stony Brook portions of the project for flood control,
                                                                       21               Green Brook Sub-basin, Raritan River Basin, New
                                                                       22               Jersey, authorized by section 401 of the Water Re-
                                                                       23               sources Development Act of 1986 (100 Stat. 4119),
                                                                       24               including the evaluation of nonstructural measures



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               to achieve the project purpose.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00084   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              85
                                                                         1                        (24) LAKE ONTARIO SHORELINE, NEW YORK.—
                                                                         2              Project for coastal storm resiliency, Lake Ontario
                                                                         3              shoreline, New York.
                                                                         4                        (25) WADING                     RIVER        CREEK,         NEW          YORK.—

                                                                         5              Project for hurricane and storm damage risk reduc-
                                                                         6              tion, flood risk management, navigation, and eco-
                                                                         7              system restoration, Wading River Creek, New York.
                                                                         8                        (26) REEL               POINT PRESERVE, NEW YORK.—

                                                                         9              Project for navigation and shoreline stabilization,
                                                                       10               Reel Point Preserve, New York.
                                                                       11                         (27) GOLDSMITH INLET, NEW YORK.—Project
                                                                       12               for navigation, Goldsmith Inlet, New York.
                                                                       13                         (28)        TUSCARAWAS                      RIVER       BASIN,           OHIO.—

                                                                       14               Project             for        comprehensive                   watershed            study,
                                                                       15               Tuscarawas River Basin, Ohio.
                                                                       16                         (29) LOWER COLUMBIA RIVER BASIN (TURNING
                                                                       17               BASIN), OREGON AND WASHINGTON.—Project to im-

                                                                       18               prove and add turning basins for the project for
                                                                       19               navigation, Columbia River Channel, Oregon and
                                                                       20               Washington, authorized by section 101(b)(13) of the
                                                                       21               Water Resources Development Act of 1999 (113
                                                                       22               Stat. 280).
                                                                       23                         (30) WILLIAMSPORT, PENNSYLVANIA.—Project
                                                                       24               for flood risk management and levee rehabilitation,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               greater Williamsport, Pennsylvania.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00085   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              86
                                                                         1                        (31) CITY              OF       CHARLESTON,                 SOUTH        CARO-

                                                                         2              LINA.—Project                  for tidal- and inland-related flood
                                                                         3              risk management, Charleston, South Carolina.
                                                                         4                        (32) TENNESSEE AND CUMBERLAND RIVER BA-
                                                                         5              SINS, TENNESSEE.—Project to deter, impede, or re-

                                                                         6              strict the dispersal of aquatic nuisance species in the
                                                                         7              Tennessee and Cumberland River Basins, Ten-
                                                                         8              nessee.
                                                                         9                        (33)        SABINE              PASS         TO      GALVESTON            BAY,

                                                                       10               TEXAS.—Modification                        of the project for hurricane
                                                                       11               and storm damage risk reduction, Port Arthur and
                                                                       12               Orange County, Texas, authorized by section 203 of
                                                                       13               the Flood Control Act of 1962 (76 Stat. 1184), and
                                                                       14               authorized as a separable element of the project for
                                                                       15               Sabine Pass to Galveston Bay, authorized by item 3
                                                                       16               of section 1401(3) of the Water Resources Develop-
                                                                       17               ment Act of 2018 (132 Stat. 3838), to reduce the
                                                                       18               risk of flooding through the construction of improve-
                                                                       19               ments to interior drainage.
                                                                       20                         (34) PORT OF VICTORIA, TEXAS.—Project for
                                                                       21               flood risk management, Port of Victoria, Texas.
                                                                       22                         (35) LOWER FOX RIVER BASIN, WISCONSIN.—
                                                                       23               Project for comprehensive watershed study, Lower
                                                                       24               Fox River Basin, Wisconsin.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00086   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              87
                                                                         1                        (36) UPPER FOX RIVER AND WOLF RIVER, WIS-
                                                                         2              CONSIN.—Project                    for flood risk management and
                                                                         3              ecosystem restoration, Upper Fox River and Wolf
                                                                         4              River, Wisconsin.
                                                                         5              (b) SPECIAL RULE.—The Secretary shall consider
                                                                         6 any study carried out by the Secretary to formulate the
                                                                         7 modifications to the project for hurricane and storm dam-
                                                                         8 age risk reduction, Port Arthur and Orange County,
                                                                         9 Texas, identified in subsection (a)(33) to be a continuation
                                                                       10 of the study carried out for Sabine Pass to Galveston Bay,
                                                                       11 Texas, authorized by a resolution of the Committee on En-
                                                                       12 vironment and Public Works of the Senate, approved June
                                                                       13 23, 2004, and funded by title IV of division B of the Bi-
                                                                       14 partisan Budget Act of 2018, under the heading ‘‘Corps
                                                                       15 of Engineers—Civil—Department of the Army—Con-
                                                                       16 struction’’ (Public Law 115–123; 132 Stat. 76).
                                                                       17      SEC. 202. EXPEDITED COMPLETIONS.

                                                                       18               (a) FEASIBILITY REPORTS.—The Secretary shall ex-
                                                                       19 pedite the completion of a feasibility study for each of the
                                                                       20 following projects, and if the Secretary determines that
                                                                       21 the project is justified in a completed report, may proceed
                                                                       22 directly to preconstruction planning, engineering, and de-
                                                                       23 sign of the project:
                                                                       24                         (1) Project for navigation, St. George Harbor,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               Alaska.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00087   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              88
                                                                         1                        (2) Project for shoreline stabilization, Aunu‘u
                                                                         2              Harbor, American Samoa.
                                                                         3                        (3) Project for shoreline stabilization, Tutuila
                                                                         4              Island, American Samoa.
                                                                         5                        (4) Project for flood risk management, Lower
                                                                         6              Santa Cruz River, Arizona.
                                                                         7                        (5) Project for flood control, water conserva-
                                                                         8              tion, and related purposes, Coyote Valley Dam, Cali-
                                                                         9              fornia.
                                                                       10                         (6) Project for flood damage reduction and eco-
                                                                       11               system restoration, Del Rosa Channel, city of San
                                                                       12               Bernardino, California.
                                                                       13                         (7) Project for flood risk management, Lower
                                                                       14               Cache Creek, California.
                                                                       15                         (8) Project for flood damage reduction and eco-
                                                                       16               system restoration, Mission-Zanja Channel, cities of
                                                                       17               San Bernardino and Redlands, California.
                                                                       18                         (9) Project for shoreline protection, Oceanside,
                                                                       19               California, authorized pursuant to section 414 of the
                                                                       20               Water Resources Development Act of 2000 (114
                                                                       21               Stat. 2636; 121 Stat. 1176).
                                                                       22                         (10) Project for flood risk management, Prado
                                                                       23               Basin, California.
                                                                       24                         (11) Project to modify the project for naviga-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               tion, San Francisco Bay to Stockton, California.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00088   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              89
                                                                         1                        (12) Project to modify the Seven Oaks Dam,
                                                                         2              California, portion of the project for flood control,
                                                                         3              Santa Ana River Mainstem, California, authorized
                                                                         4              by section 401(a) of the Water Resources Develop-
                                                                         5              ment Act of 1986 (100 Stat. 4113; 101 Stat. 1329–
                                                                         6              111; 104 Stat. 4611; 110 Stat. 3713; 121 Stat.
                                                                         7              1115), to include water conservation as an author-
                                                                         8              ized purpose.
                                                                         9                        (13) Project to modify the project for naviga-
                                                                       10               tion, Delaware River Mainstem and Channel Deep-
                                                                       11               ening, Delaware, New Jersey, and Pennsylvania, au-
                                                                       12               thorized by section 101(6) of the Water Resources
                                                                       13               Development Act of 1992 (106 Stat. 4802; 113
                                                                       14               Stat. 300; 114 Stat. 2602), to include the construc-
                                                                       15               tion of a turning basin located near the Packer Ave-
                                                                       16               nue Marine Terminal.
                                                                       17                         (14) Project for ecosystem restoration, Central
                                                                       18               and Southern Florida Project Canal 111 (C–111),
                                                                       19               South Dade County, Florida.
                                                                       20                         (15) Project for comprehensive hurricane and
                                                                       21               storm damage risk reduction and shoreline erosion
                                                                       22               protection, Chicago, Illinois, authorized by section
                                                                       23               101(a)(12) of the Water Resources Development Act
                                                                       24               of 1996 (110 Stat. 3664; 113 Stat. 302).



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00089   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              90
                                                                         1                        (16) Project for flood risk management, Whea-
                                                                         2              ton, DuPage County, Illinois.
                                                                         3                        (17) Project for flood damage reduction, eco-
                                                                         4              system restoration, and recreation, Blue River
                                                                         5              Basin, Kansas City, Kansas, carried out pursuant to
                                                                         6              the resolution of the Committee on Transportation
                                                                         7              and Infrastructure of the House of Representatives
                                                                         8              adopted on September 24, 2008 (docket number
                                                                         9              2803).
                                                                       10                         (18) Project for flood control, Amite River and
                                                                       11               Tributaries east of the Mississippi River, Louisiana.
                                                                       12                         (19) Project for coastal storm risk manage-
                                                                       13               ment, Upper Barataria Basin, Louisiana.
                                                                       14                         (20) Project to replace the Bourne and Saga-
                                                                       15               more Bridges, Cape Cod, Massachusetts.
                                                                       16                         (21) Project to deepen the project for naviga-
                                                                       17               tion, Gulfport Harbor, Mississippi, authorized by
                                                                       18               section 202(a) of the Water Resources Development
                                                                       19               Act of 1986 (100 Stat. 4094).
                                                                       20                         (22) Project for flood risk management, Rah-
                                                                       21               way River Basin, New Jersey.
                                                                       22                         (23) Project for hurricane and storm damage
                                                                       23               risk reduction, Raritan Bay and Sandy Hook Bay,
                                                                       24               Highlands, New Jersey.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00090   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              91
                                                                         1                        (24) Project for navigation, Shark River, New
                                                                         2              Jersey.
                                                                         3                        (25)        Project             for     flood        risk         management,
                                                                         4              Rondout Creek-Wallkill River Watershed, New York,
                                                                         5              carried out pursuant to the resolution of the Com-
                                                                         6              mittee on Transportation and Infrastructure of the
                                                                         7              House of Representatives adopted on May 2, 2007
                                                                         8              (docket number 2776).
                                                                         9                        (26) Project for ecosystem restoration and hur-
                                                                       10               ricane and storm damage risk reduction, Spring
                                                                       11               Creek South (Howard Beach), Queens, New York.
                                                                       12                         (27) Project to resolve increased silting and
                                                                       13               shoaling adjacent to the Federal channel, Port of
                                                                       14               Bandon, Coquille River, Oregon.
                                                                       15                         (28) Project for flood control, 42nd Street
                                                                       16               Levee, Springfield, Oregon, being carried out under
                                                                       17               section 205 of the Flood Control Act of 1948 (33
                                                                       18               U.S.C. 701s).
                                                                       19                         (29) Project for ecosystem restoration, Hood
                                                                       20               River at the confluence with the Columbia River, Or-
                                                                       21               egon.
                                                                       22                         (30) Project for flood risk management, Rio
                                                                       23               Culebrinas, Puerto Rico.
                                                                       24                         (31) Project for flood risk management, Rio



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               Grande de Manati, Puerto Rico.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00091   Fmt 6652    Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              92
                                                                         1                        (32) Project for flood risk management, Rio
                                                                         2              Guayanilla, Puerto Rico.
                                                                         3                        (33) Project for flood risk management, Dor-
                                                                         4              chester County, South Carolina.
                                                                         5                        (34) Project for navigation, Georgetown Har-
                                                                         6              bor, South Carolina.
                                                                         7                        (35) Project for hurricane and storm damage
                                                                         8              risk reduction, Myrtle Beach, South Carolina.
                                                                         9                        (36) Project to modify the projects for naviga-
                                                                       10               tion and other purposes, Old Hickory Lock and Dam
                                                                       11               and the Cordell Hull Dam and Reservoir, Cum-
                                                                       12               berland River, Tennessee, authorized by the Act of
                                                                       13               July 24, 1946 (chapter 595, 60 Stat. 636), to add
                                                                       14               flood risk management as an authorized purpose.
                                                                       15                         (37) Project for flood risk management, eco-
                                                                       16               system restoration, water supply, and related pur-
                                                                       17               poses, Lower Rio Grande River, Cameron County,
                                                                       18               Texas, carried out pursuant to the resolution of the
                                                                       19               Committee on Transportation and Infrastructure of
                                                                       20               the House of Representatives adopted on May 21,
                                                                       21               2003 (docket number 2710).
                                                                       22                         (38) Project for hurricane and storm damage
                                                                       23               risk reduction and shoreline erosion protection,
                                                                       24               Bolongo Bay, St. Thomas, United States Virgin Is-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               lands.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00092   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              93
                                                                         1                        (39) Project for flood risk management, Savan
                                                                         2              Gut Phase II, St. Thomas, United States Virgin Is-
                                                                         3              lands.
                                                                         4                        (40) Project for flood risk management, Tur-
                                                                         5              pentine Run, St. Thomas, United States Virgin Is-
                                                                         6              lands.
                                                                         7                        (41) Project for navigation, North Landing
                                                                         8              Bridge, Atlantic Intracoastal Waterway, Virginia.
                                                                         9              (b) POST-AUTHORIZATION CHANGE REPORTS.—The
                                                                       10 Secretary shall expedite completion of a post-authorization
                                                                       11 change report for the following projects:
                                                                       12                         (1) Project for ecosystem restoration, Tres
                                                                       13               Rios, Arizona.
                                                                       14                         (2) Project for flood control, San Luis Rey
                                                                       15               River, California.
                                                                       16                         (3) Project for ecosystem restoration, Central
                                                                       17               and Southern Florida Project Canal 111 (C–111),
                                                                       18               South Dade County, Florida.
                                                                       19                         (4) Project for ecosystem restoration, Com-
                                                                       20               prehensive                     Everglades                 Restoration              Plan,
                                                                       21               Caloosahatchee River C–43, West Basin Storage
                                                                       22               Reservoir, Florida.
                                                                       23                         (5) Project for flood risk management, Des
                                                                       24               Moines Levee System, including Birdland Park



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00093   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              94
                                                                         1              Levee, Des Moines and Raccoon Rivers, Des Moines,
                                                                         2              Iowa.
                                                                         3              (c) WATERSHED AND RIVER BASIN ASSESSMENTS.—
                                                                         4 The Secretary shall expedite the completion of an assess-
                                                                         5 ment under section 729 of the Water Resources Develop-
                                                                         6 ment Act of 1986 (33 U.S.C. 2267a), for the following:
                                                                         7                        (1) Kansas River Basin, Kansas.
                                                                         8                        (2) Merrimack River Basin, Massachusetts.
                                                                         9              (d) DISPOSITION STUDIES.—The Secretary shall ex-
                                                                       10 pedite the completion of a disposition study, carried out
                                                                       11 under section 216 of the Flood Control Act of 1970 (33
                                                                       12 U.S.C. 549a), for the following:
                                                                       13                         (1) The disposition of the project for Salinas
                                                                       14               Reservoir (Santa Margarita Lake), California.
                                                                       15                         (2) The partial disposition of the Upper St. An-
                                                                       16               thony Falls Lock facility and surrounding real prop-
                                                                       17               erty, in accordance with the requirements of section
                                                                       18               2010 of the Water Resources Reform and Develop-
                                                                       19               ment Act of 2014 (128 Stat. 1270; 132 Stat. 3812).
                                                                       20      SEC. 203. FEASIBILITY STUDY MODIFICATIONS.

                                                                       21               (a) SAN FRANCISCO BAY, CALIFORNIA.—Section 142
                                                                       22 of the Water Resources Development Act of 1976 (90
                                                                       23 Stat. 2930) is amended—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00094   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              95
                                                                         1                        (1) by inserting ‘‘, and along the ocean shore-
                                                                         2              line of San Mateo, San Francisco, and Marin Coun-
                                                                         3              ties,’’ after ‘‘Sacramento and San Joaquin Rivers’’;
                                                                         4                        (2) by inserting ‘‘and, with respect to the bay
                                                                         5              and ocean shorelines of San Mateo, San Francisco,
                                                                         6              and Marin Counties, the feasibility of and the Fed-
                                                                         7              eral interest in providing measures to adapt to rising
                                                                         8              sea levels’’ after ‘‘tidal and fluvial flooding’’;
                                                                         9                        (3) by striking ‘‘investigation’’ and inserting in
                                                                       10               its place ‘‘investigations’’; and
                                                                       11                         (4) by inserting after ‘‘San Francisco Bay re-
                                                                       12               gion’’ the following: ‘‘and, with respect to the bay
                                                                       13               and ocean shorelines and streams running to the bay
                                                                       14               and ocean shorelines of San Mateo, San Francisco,
                                                                       15               and Marin Counties, the effects of proposed meas-
                                                                       16               ures or improvements on the local economy; habitat
                                                                       17               restoration, enhancement, or expansion efforts or op-
                                                                       18               portunities; public infrastructure protection and im-
                                                                       19               provement; stormwater runoff capacity and control
                                                                       20               measures, including those that may mitigate flood-
                                                                       21               ing; erosion of beaches and coasts; and any other
                                                                       22               measures or improvements relevant to adapting to
                                                                       23               rising sea levels’’.
                                                                       24               (b) SACRAMENTO RIVER, SOUTHERN SUTTER COUN-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25      TY, CALIFORNIA.—The study for flood control and allied



                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00095   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              96
                                                                         1 purposes for the Sacramento River Basin, authorized by
                                                                         2 section 209 of the Flood Control Act of 1962 (76 Stat.
                                                                         3 1197), is modified to authorize the Secretary to conduct
                                                                         4 a study for flood risk management, southern Sutter Coun-
                                                                         5 ty between the Sacramento River and Sutter Bypass, Cali-
                                                                         6 fornia.
                                                                         7              (c) SALTON SEA, CALIFORNIA.—In carrying out the
                                                                         8 program to implement projects to restore the Salton Sea,
                                                                         9 California, authorized by section 3032 of the Water Re-
                                                                       10 sources Development Act of 2007 (121 Stat. 1113; 130
                                                                       11 Stat. 1677), the Secretary is authorized to carry out a
                                                                       12 study for the construction of a perimeter lake, or a north-
                                                                       13 ern or southern subset thereof, for the Salton Sea, Cali-
                                                                       14 fornia.
                                                                       15               (d) NEW YORK AND NEW JERSEY HARBOR AND
                                                                       16 TRIBUTARIES, NEW YORK AND NEW JERSEY.—The study
                                                                       17 for flood and storm damage reduction for the New York
                                                                       18 and New Jersey Harbor and Tributaries project, author-
                                                                       19 ized by the Act of June 15, 1955 (chapter 140, 69 Stat.
                                                                       20 132), and being carried out pursuant to the Disaster Re-
                                                                       21 lief Appropriations Act, 2013 (Public Law 113–2), is
                                                                       22 modified to require the Secretary to—
                                                                       23                         (1) evaluate and address the impacts of low-fre-
                                                                       24               quency precipitation and sea-level rise on the study



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               area;


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00096   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              97
                                                                         1                        (2) consult with affected communities; and
                                                                         2                        (3) ensure the study is carried out in accord-
                                                                         3              ance with section 1001 of the Water Resources Re-
                                                                         4              form and Development Act of 2014 (33 U.S.C.
                                                                         5              2282c).
                                                                         6     SEC. 204. SELMA, ALABAMA.

                                                                         7              Not later than 180 days after the date of enactment
                                                                         8 of this Act, the Secretary shall submit to the Committee
                                                                         9 on Transportation and Infrastructure of the House of
                                                                       10 Representatives and the Committee on Environment and
                                                                       11 Public Works of the Senate a report that—
                                                                       12                         (1) provides an update on the study for flood
                                                                       13               risk management and riverbank stabilization, Selma,
                                                                       14               Alabama, authorized by resolutions of the Commit-
                                                                       15               tees on Public Works and Rivers and Harbors of the
                                                                       16               House of Representatives on June 7, 1961, and
                                                                       17               April 28, 1936, respectively, the completion of which
                                                                       18               the Secretary was required to expedite by section
                                                                       19               1203 of the Water Resources Development Act of
                                                                       20               2018 (132 Stat. 3803); and
                                                                       21                         (2) identifies project alternatives necessary to—
                                                                       22                                  (A) assure the preservation of cultural and
                                                                       23                         historic values associated with national historic
                                                                       24                         landmarks within the study area; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00097   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              98
                                                                         1                                 (B) provide flood risk management for eco-
                                                                         2                        nomically disadvantaged communities within the
                                                                         3                        study area.
                                                                         4     SEC. 205. COMPREHENSIVE STUDY OF THE SACRAMENTO

                                                                         5                             RIVER, YOLO BYPASS, CALIFORNIA.

                                                                         6              (a) COMPREHENSIVE STUDY.—The Secretary shall
                                                                         7 conduct a comprehensive study of the Sacramento River
                                                                         8 in the vicinity of the Yolo Bypass System, California, to
                                                                         9 identify actions to be undertaken by the Secretary for the
                                                                       10 comprehensive management of the Yolo Bypass System
                                                                       11 for the purposes of flood risk management, ecosystem res-
                                                                       12 toration, water supply, hydropower, and recreation.
                                                                       13               (b) CONSULTATION AND USE OF EXISTING DATA.—
                                                                       14                         (1) CONSULTATION.—In conducting the com-
                                                                       15               prehensive study under subsection (a), the Secretary
                                                                       16               shall consult with the Governor of the State of Cali-
                                                                       17               fornia, applicable Federal, State, and local agencies,
                                                                       18               non-Federal interests, the Yolo Bypass and Cache
                                                                       19               Slough Partnership, and other stakeholders.
                                                                       20                         (2) USE OF EXISTING DATA AND PRIOR STUD-
                                                                       21               IES.—To the maximum extent practicable and where

                                                                       22               appropriate, the Secretary may—
                                                                       23                                  (A) make use of existing data provided to
                                                                       24                         the Secretary by the entities identified in para-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         graph (1); and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00098   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              99
                                                                         1                                 (B) incorporate—
                                                                         2                                         (i) relevant information from prior
                                                                         3                                 studies and projects carried out by the
                                                                         4                                 Secretary within the study area; and
                                                                         5                                         (ii) the latest technical data and sci-
                                                                         6                                 entific approaches to changing hydrologic
                                                                         7                                 and climatic conditions.
                                                                         8              (c) RECOMMENDATIONS.—
                                                                         9                        (1) IN          GENERAL.—In                    conducting the com-
                                                                       10               prehensive study under subsection (a), the Secretary
                                                                       11               may develop a recommendation to Congress for—
                                                                       12                                  (A) the construction of a water resources
                                                                       13                         development project;
                                                                       14                                  (B) the structural or operational modifica-
                                                                       15                         tion of an existing water resources development
                                                                       16                         project;
                                                                       17                                  (C) additional monitoring of, or adaptive
                                                                       18                         management measures to carry out with respect
                                                                       19                         to,      existing           water           resources            development
                                                                       20                         projects, to respond to changing hydrologic and
                                                                       21                         climatic conditions; or
                                                                       22                                  (D) geographic areas within the Yolo By-
                                                                       23                         pass System for additional study by the Sec-
                                                                       24                         retary.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00099   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             100
                                                                         1                        (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                         2              bility study carried out pursuant to a recommenda-
                                                                         3              tion under paragraph (1)(D) shall be considered to
                                                                         4              be a continuation of the comprehensive study au-
                                                                         5              thorized under subsection (a).
                                                                         6              (d) COMPLETION                      OF       STUDY; REPORT                     TO   CON-
                                                                         7     GRESS.—Not later than 3 years after the date of enact-

                                                                         8 ment of this section, the Secretary shall submit to the
                                                                         9 Committee on Transportation and Infrastructure of the
                                                                       10 House of Representatives and the Committee on Environ-
                                                                       11 ment and Public Works of the Senate a report detailing—
                                                                       12                         (1) the results of the comprehensive study con-
                                                                       13               ducted under subsection (a), including any rec-
                                                                       14               ommendations developed under subsection (c);
                                                                       15                         (2) any additional, site-specific areas within the
                                                                       16               Yolo Bypass System where additional study for flood
                                                                       17               risk management or ecosystem restoration projects
                                                                       18               is recommended by the Secretary; and
                                                                       19                         (3) any interim actions relating to existing
                                                                       20               water resources development projects undertaken by
                                                                       21               the Secretary during the study period.
                                                                       22               (e) DEFINITIONS.—In this section:
                                                                       23                         (1) YOLO BYPASS SYSTEM.—The term ‘‘Yolo
                                                                       24               Bypass System’’ means the system of weirs, levees,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               bypass structures, and other water resources devel-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00100   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             101
                                                                         1              opment projects in California’s Sacramento River
                                                                         2              Valley, extending from the Fremont Weir near
                                                                         3              Woodland, California, to the Sacramento River near
                                                                         4              Rio Vista, California, authorized pursuant to section
                                                                         5              2 of the Act of March 1, 1917 (chapter 144; 39
                                                                         6              Stat. 949).
                                                                         7                        (2) YOLO BYPASS AND CACHE CLOUGH PART-
                                                                         8              NERSHIP.—The                     term ‘‘Yolo Bypass and Cache
                                                                         9              Slough Partnership’’ means the group of parties to
                                                                       10               the Yolo Bypass and Cache Slough Memorandum of
                                                                       11               Understanding, effective May 2016, regarding col-
                                                                       12               laboration and cooperation in the Yolo Bypass and
                                                                       13               Cache Slough region.
                                                                       14      SEC. 206. LAKE OKEECHOBEE REGULATION SCHEDULE,

                                                                       15                              FLORIDA.

                                                                       16               (a) IN GENERAL.—In carrying out the review of the
                                                                       17 Lake Okeechobee regulation schedule pursuant to section
                                                                       18 1106 of the Water Resources Development Act of 2018
                                                                       19 (132 Stat. 3773), the Secretary shall—
                                                                       20                         (1) evaluate the implications of prohibiting re-
                                                                       21               leases from Lake Okeechobee through the S–308
                                                                       22               and S–80 lock and dam structures on the operation
                                                                       23               of the lake in accordance with authorized purposes
                                                                       24               and seek to minimize unnecessary releases to coastal



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               estuaries; and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00101   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             102
                                                                         1                        (2) to the maximum extent practicable, coordi-
                                                                         2              nate with the ongoing efforts of Federal and State
                                                                         3              agencies responsible for monitoring, forecasting, and
                                                                         4              notification of cyanobacteria levels in Lake Okee-
                                                                         5              chobee.
                                                                         6              (b) MONTHLY REPORT.—Each month, the Secretary
                                                                         7 shall make public a report, which may be based on the
                                                                         8 Water Management Daily Operational Reports, disclosing
                                                                         9 the volumes of water deliveries to or discharges from Lake
                                                                       10 Okeechobee & Vicinity, Water Conservation Area I, Water
                                                                       11 Conservation Area II, Water Conservation Area III, East
                                                                       12 Coast Canals, and the South Dade Conveyance. Such re-
                                                                       13 port shall be aggregated and reported in a format designed
                                                                       14 for the general public, using maps or other widely under-
                                                                       15 stood communication tools.
                                                                       16               (c) EFFECT.—In carrying out the evaluation under
                                                                       17 subsection (a)(1), nothing shall be construed to authorize
                                                                       18 any new purpose for the management of Lake Okeechobee
                                                                       19 or authorize the Secretary to affect any existing author-
                                                                       20 ized purpose, including flood protection and management
                                                                       21 of Lake Okeechobee to provide water supply for all author-
                                                                       22 ized users.
                                                                       23      SEC. 207. GREAT LAKES COASTAL RESILIENCY STUDY.

                                                                       24               (a) IN GENERAL.—In carrying out the comprehensive



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 assessment of water resources needs for the Great Lakes


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00102   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             103
                                                                         1 System under section 729 of the Water Resources Devel-
                                                                         2 opment Act of 1986 (33 U.S.C. 2267a), as required by
                                                                         3 section 1219 of the Water Resources Development Act of
                                                                         4 2018 (132 Stat. 3811), the Secretary shall—
                                                                         5                        (1) taking into account recent high lake levels
                                                                         6              within the Great Lakes, assess and make rec-
                                                                         7              ommendations to Congress on—
                                                                         8                                 (A) coastal storm and flood risk manage-
                                                                         9                        ment measures, including measures that use
                                                                       10                         natural features and nature-based features, as
                                                                       11                         those terms are defined in section 1184 of the
                                                                       12                         Water Resources Development Act of 2016 (33
                                                                       13                         U.S.C. 2289a);
                                                                       14                                  (B) operation and maintenance of the
                                                                       15                         Great Lakes Navigation System, as such term
                                                                       16                         is defined in section 210 of the Water Re-
                                                                       17                         sources Development Act of 1986 (33 U.S.C.
                                                                       18                         2238);
                                                                       19                                  (C) ecosystem protection and restoration;
                                                                       20                                  (D) the prevention and control of invasive
                                                                       21                         species and the effects of invasive species; and
                                                                       22                                  (E) recreation associated with water re-
                                                                       23                         sources development projects;




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00103   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             104
                                                                         1                        (2) prioritize actions necessary to protect crit-
                                                                         2              ical public infrastructure, communities, and critical
                                                                         3              natural or cultural resources; and
                                                                         4                        (3) to the maximum extent practicable and
                                                                         5              where appropriate, utilize existing data provided to
                                                                         6              the Secretary by Federal and State agencies, Indian
                                                                         7              Tribes, and other stakeholders, including data ob-
                                                                         8              tained through other Federal programs.
                                                                         9              (b) RECOMMENDATIONS; ADDITIONAL STUDY.—
                                                                       10                         (1) IN GENERAL.—In carrying out the com-
                                                                       11               prehensive assessment described in subsection (a),
                                                                       12               the Secretary may make a recommendation to Con-
                                                                       13               gress for—
                                                                       14                                  (A) the construction of a water resources
                                                                       15                         development project;
                                                                       16                                  (B) the structural or operational modifica-
                                                                       17                         tion of an existing water resources development
                                                                       18                         project;
                                                                       19                                  (C) such additional monitoring of, or
                                                                       20                         adaptive management measures to carry out
                                                                       21                         with respect to, existing water resources devel-
                                                                       22                         opment projects, to respond to changing hydro-
                                                                       23                         logic and climatic conditions; or




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00104   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             105
                                                                         1                                 (D) geographic areas within the Great
                                                                         2                        Lakes System for additional study by the Sec-
                                                                         3                        retary.
                                                                         4                        (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                         5              bility study carried out pursuant to a recommenda-
                                                                         6              tion under paragraph (1)(D) shall be considered to
                                                                         7              be a continuation of the comprehensive assessment
                                                                         8              described in subsection (a).
                                                                         9              (c) EXEMPTION FROM MAXIMUM STUDY COST AND
                                                                       10 DURATION LIMITATIONS.—Section 1001 of the Water Re-
                                                                       11 sources Reform and Development Act of 2014 (33 U.S.C.
                                                                       12 2282c) shall not apply to any study recommended under
                                                                       13 subsection (b)(1)(D).
                                                                       14      SEC. 208. RATHBUN LAKE, CHARITON RIVER, IOWA.

                                                                       15               Not later than 1 year after the date of enactment
                                                                       16 of this Act, the Secretary shall submit to the Committee
                                                                       17 on Transportation and Infrastructure of the House of
                                                                       18 Representatives and the Committee on Environment and
                                                                       19 Public Works of the Senate a report that evaluates—
                                                                       20                         (1) the existing allocations of storage space for
                                                                       21               Rathbun Lake, authorized pursuant to the Flood
                                                                       22               Control Act of 1954 (68 Stat. 1262; 121 Stat.
                                                                       23               1124), including the existing allocation for municipal
                                                                       24               water supply;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00105   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             106
                                                                         1                        (2) the feasibility of expanding the existing allo-
                                                                         2              cation of storage for municipal water supply; and
                                                                         3                        (3) the affordability of future municipal water
                                                                         4              supply allocations from Rathbun Lake, for residen-
                                                                         5              tial users of such future allocations, at projected fu-
                                                                         6              ture costs.
                                                                         7     SEC. 209. REPORT ON THE STATUS OF RESTORATION IN

                                                                         8                              THE LOUISIANA COASTAL AREA.

                                                                         9              Not later than 1 year after the date of enactment
                                                                       10 of this Act, the Coastal Louisiana Ecosystem Protection
                                                                       11 and Restoration Task Force established by section 7004
                                                                       12 of Water Resources Development Act of 2007 (121 Stat.
                                                                       13 1272) shall submit to Congress a report that summarizes
                                                                       14 the activities and recommendations of the task force, in-
                                                                       15 cluding—
                                                                       16                         (1)       policies,             strategies,          plans,          programs,
                                                                       17               projects, and activities undertaken for addressing
                                                                       18               conservation, protection, restoration, and mainte-
                                                                       19               nance of the coastal Louisiana ecosystem; and
                                                                       20                         (2) financial participation by each agency rep-
                                                                       21               resented on the Task Force in conserving, pro-
                                                                       22               tecting, restoring, and maintaining the coastal Lou-
                                                                       23               isiana ecosystem.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00106   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             107
                                                                         1     SEC. 210. LOWER MISSISSIPPI RIVER COMPREHENSIVE

                                                                         2                             STUDY.

                                                                         3              (a) COMPREHENSIVE STUDY.—
                                                                         4                        (1) IN GENERAL.—The Secretary shall conduct
                                                                         5              a comprehensive study of the Lower Mississippi
                                                                         6              River basin, from Cape Girardeau, Missouri, to the
                                                                         7              Gulf of Mexico, to identify actions to be undertaken
                                                                         8              by the Secretary for the comprehensive management
                                                                         9              of the basin for the purposes of flood risk manage-
                                                                       10               ment, navigation, ecosystem restoration, water sup-
                                                                       11               ply, hydropower, and recreation.
                                                                       12                         (2) FOCUS AREAS.—In conducting the com-
                                                                       13               prehensive study under paragraph (1), the Secretary
                                                                       14               shall investigate projects, including—
                                                                       15                                  (A) projects proposed in the comprehensive
                                                                       16                         coastal protection master plan entitled ‘‘Lou-
                                                                       17                         isiana Comprehensive Master Plan for a Sus-
                                                                       18                         tainable Coast’’ prepared by the State of Lou-
                                                                       19                         isiana and accepted by the Louisiana Coastal
                                                                       20                         Protection and Restoration Authority (including
                                                                       21                         any subsequent amendments or revisions), in-
                                                                       22                         cluding—
                                                                       23                                          (i) Ama sediment diversion;
                                                                       24                                          (ii) Union freshwater diversion;




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                          (iii) increase Atchafalaya flow to
                                                                       26                                  Terrebonne; and
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00107   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             108
                                                                         1                                         (iv) Manchac Landbridge diversion;
                                                                         2                                 and
                                                                         3                                 (B) natural features and nature-based fea-
                                                                         4                        tures, including levee setbacks and instream
                                                                         5                        and floodplain restoration.
                                                                         6              (b) CONSULTATION AND USE OF EXISTING DATA.—
                                                                         7 In conducting the comprehensive study under subsection
                                                                         8 (a), the Secretary shall consult with applicable Federal,
                                                                         9 State, and local agencies, Indian Tribes, non-Federal in-
                                                                       10 terests, and other stakeholders, and, to the maximum ex-
                                                                       11 tent practicable and where appropriate, make use of exist-
                                                                       12 ing data provided to the Secretary by such parties.
                                                                       13               (c) RECOMMENDATIONS.—
                                                                       14                         (1) IN          GENERAL.—In                    conducting the com-
                                                                       15               prehensive study under subsection (a), the Secretary
                                                                       16               may develop a recommendation to Congress for—
                                                                       17                                  (A) the construction of a water resources
                                                                       18                         development project;
                                                                       19                                  (B) the structural or operational modifica-
                                                                       20                         tion of an existing water resources development
                                                                       21                         project;
                                                                       22                                  (C) such additional monitoring of, or
                                                                       23                         adaptive management measures to carry out
                                                                       24                         with respect to, existing water resources devel-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00108   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             109
                                                                         1                        opment projects, to respond to changing condi-
                                                                         2                        tions; or
                                                                         3                                 (D) geographic areas within the Lower
                                                                         4                        Mississippi River basin for additional study by
                                                                         5                        the Secretary.
                                                                         6                        (2) ADDITIONAL CONSIDERATIONS.—Any feasi-
                                                                         7              bility study carried out pursuant to a recommenda-
                                                                         8              tion under this subsection shall be considered to be
                                                                         9              a continuation of the comprehensive study required
                                                                       10               under subsection (a).
                                                                       11               (d) COMPLETION                      OF       STUDY; REPORT                     TO   CON-
                                                                       12      GRESS.—Not later than 3 years after the date of enact-

                                                                       13 ment of this section, the Secretary shall submit to the
                                                                       14 Committee on Transportation and Infrastructure of the
                                                                       15 House of Representatives and the Committee on Environ-
                                                                       16 ment and Public Works of the Senate a report detailing—
                                                                       17                         (1) the results of the comprehensive study re-
                                                                       18               quired by this section, including any recommenda-
                                                                       19               tions developed under subsection (c); and
                                                                       20                         (2) any interim actions relating to existing
                                                                       21               water resources development projects undertaken by
                                                                       22               the Secretary during the study period.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00109   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             110
                                                                         1     SEC. 211. UPPER MISSISSIPPI RIVER COMPREHENSIVE

                                                                         2                             PLAN.

                                                                         3              (a) ASSESSMENT.—The Secretary shall conduct an
                                                                         4 assessment of the water resources needs of the Upper Mis-
                                                                         5 sissippi River under section 729 of the Water Resources
                                                                         6 Development Act of 1986 (33 U.S.C. 2267a).
                                                                         7              (b) REQUIREMENTS.—The Secretary shall carry out
                                                                         8 the assessment under subsection (a) in accordance with
                                                                         9 the requirements in section 1206(b) of Water Resources
                                                                       10 Development Act of 2016 (130 Stat. 1686).
                                                                       11      SEC. 212. LOWER MISSOURI BASIN FLOOD RISK AND RESIL-

                                                                       12                              IENCY STUDY, IOWA, KANSAS, NEBRASKA,

                                                                       13                              AND MISSOURI.

                                                                       14               (a) ADDITIONAL STUDIES.—
                                                                       15                         (1) IN GENERAL.—Except as provided in para-
                                                                       16               graph (2), upon the request of the non-Federal in-
                                                                       17               terest for the Lower Missouri Basin study, the Sec-
                                                                       18               retary shall expand the scope of such study to inves-
                                                                       19               tigate and provide recommendations relating to—
                                                                       20                                  (A) modifications to projects in Iowa, Kan-
                                                                       21                         sas, Nebraska, and Missouri authorized under
                                                                       22                         the Pick-Sloan Missouri River Basin Program
                                                                       23                         (authorized by section 9(b) of the Flood Control
                                                                       24                         Act of December 22, 1944 (chapter 665, 58




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         Stat. 891)) and the Missouri River Bank Sta-
                                                                       26                         bilization and Navigation project (authorized by
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00110   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             111
                                                                         1                        section 2 of the Act of March 2, 1945 (chapter
                                                                         2                        19, 59 Stat. 19)), including modifications to the
                                                                         3                        authorized purposes of such projects to further
                                                                         4                        flood risk management and resiliency; and
                                                                         5                                 (B) modifications to non-Federal, publicly
                                                                         6                        owned levees in the Lower Missouri River
                                                                         7                        Basin.
                                                                         8                        (2) EXCEPTION.—If the Secretary determines
                                                                         9              that expanding the scope of the Lower Missouri
                                                                       10               Basin study as provided in paragraph (1) is not
                                                                       11               practicable, and the non-Federal interest for such
                                                                       12               study concurs in such determination, the Secretary
                                                                       13               shall carry out such additional studies as are nec-
                                                                       14               essary to investigate the modifications described in
                                                                       15               paragraph (1).
                                                                       16                         (3) CONTINUATION OF LOWER MISSOURI BASIN
                                                                       17               STUDY.—The following studies shall be considered a

                                                                       18               continuation of the Lower Missouri Basin study:
                                                                       19                                  (A) Any additional study carried out under
                                                                       20                         paragraph (2).
                                                                       21                                  (B) Any study recommended to be carried
                                                                       22                         out in a report that the Chief of Engineers pre-
                                                                       23                         pares for the Lower Missouri Basin study.
                                                                       24                                  (C) Any study recommended to be carried



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         out in a report that the Chief of Engineers pre-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00111   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             112
                                                                         1                        pares for an additional study carried out under
                                                                         2                        paragraph (2).
                                                                         3                                 (D) Any study spun off from the Lower
                                                                         4                        Missouri Basin study before the completion of
                                                                         5                        such study.
                                                                         6                                 (E) Any study spun off from an additional
                                                                         7                        study carried out under paragraph (2) before
                                                                         8                        the completion of such additional study.
                                                                         9                        (4) RELIANCE ON EXISTING INFORMATION.—In
                                                                       10               carrying out any study described in or authorized by
                                                                       11               this section, the Secretary, to the extent practicable,
                                                                       12               shall rely on existing data and analysis, including
                                                                       13               data and analysis prepared under section 22 of the
                                                                       14               Water Resources Development Act of 1974 (42
                                                                       15               U.S.C. 1962d–16).
                                                                       16                         (5) CONSIDERATION; CONSULTATION.—In de-
                                                                       17               veloping recommendations under paragraph (1), the
                                                                       18               Secretary shall—
                                                                       19                                  (A) consider the use of—
                                                                       20                                          (i) structural and nonstructural meas-
                                                                       21                                  ures, including the setting back of levees
                                                                       22                                  and removing structures from areas of re-
                                                                       23                                  curring flood vulnerability, where advan-
                                                                       24                                  tageous, to reduce flood risk and damages



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  in the Lower Missouri River Basin; and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00112   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             113
                                                                         1                                         (ii) where such features are locally ac-
                                                                         2                                 ceptable, natural features or nature-based
                                                                         3                                 features (as such terms are defined in sec-
                                                                         4                                 tion 1184 of the Water Resources Develop-
                                                                         5                                 ment Act of 2016 (33 U.S.C. 2289a); and
                                                                         6                                 (B) consult with applicable Federal and
                                                                         7                        State agencies, Indian Tribes, and other stake-
                                                                         8                        holders within the Lower Missouri River Basin
                                                                         9                        and solicit public comment on such rec-
                                                                       10                         ommendations.
                                                                       11                         (6) EXEMPTION FROM MAXIMUM STUDY COST
                                                                       12               AND DURATION LIMITATIONS.—Section 1001 of the

                                                                       13               Water Resources Reform and Development Act of
                                                                       14               2014 (33 U.S.C. 2282c) shall not apply to the
                                                                       15               Lower Missouri Basin study or any study described
                                                                       16               in paragraph (3).
                                                                       17                         (7) PRECONSTRUCTION,                              ENGINEERING,           AND

                                                                       18               DESIGN.—Upon completion of a study authorized by

                                                                       19               this section, if the Secretary determines that a rec-
                                                                       20               ommended project, or modification to a project de-
                                                                       21               scribed in paragraph (1), is justified, the Secretary
                                                                       22               may proceed directly to preconstruction planning,
                                                                       23               engineering, and design of the project or modifica-
                                                                       24               tion.



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         (8) TECHNICAL ASSISTANCE.—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00113   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             114
                                                                         1                                 (A) IN GENERAL.—For the provision of
                                                                         2                        technical assistance to support small commu-
                                                                         3                        nities and economically disadvantaged commu-
                                                                         4                        nities in the planning and design of flood risk
                                                                         5                        management and flood risk resiliency projects
                                                                         6                        in the Lower Missouri River Basin, for each of
                                                                         7                        fiscal years 2021 through 2026, there are au-
                                                                         8                        thorized to be appropriated—
                                                                         9                                         (i) $2,000,000 to carry out section
                                                                       10                                  206 of the Flood Control Act of 1960 (33
                                                                       11                                  U.S.C. 709a), in addition to amounts oth-
                                                                       12                                  erwise authorized to carry out such sec-
                                                                       13                                  tion; and
                                                                       14                                          (ii) $2,000,000 to carry out section
                                                                       15                                  22(a)(2) of the Water Resources Develop-
                                                                       16                                  ment Act of 1974 (42 U.S.C. 1962d–16),
                                                                       17                                  in addition to amounts otherwise author-
                                                                       18                                  ized to carry out such section.
                                                                       19                                  (B) CONDITIONS.—
                                                                       20                                          (i) LIMITATIONS NOT APPLICABLE.—
                                                                       21                                  The limitations on the use of funds in sec-
                                                                       22                                  tion 206(d) of the Flood Control Act of
                                                                       23                                  1960 and section 22(c)(2) of the Water
                                                                       24                                  Resources Development Act of 1974 shall



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00114   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             115
                                                                         1                                 not apply to the amounts authorized to be
                                                                         2                                 appropriated by subparagraph (A).
                                                                         3                                         (ii) RULE OF CONSTRUCTION.—Noth-
                                                                         4                                 ing in this paragraph restricts the author-
                                                                         5                                 ity of the Secretary to use any funds other-
                                                                         6                                 wise appropriated to carry out section 206
                                                                         7                                 of the Flood Control Act of 1960 or sec-
                                                                         8                                 tion 22(a)(2) of the Water Resources De-
                                                                         9                                 velopment Act of 1974 to provide technical
                                                                       10                                  assistance described in subparagraph (A).
                                                                       11                         (9) COMPLETION OF STUDY; REPORT TO CON-
                                                                       12               GRESS.—Not later than 3 years after the date of en-

                                                                       13               actment of this Act, the Secretary shall submit to
                                                                       14               the Committee on Transportation and Infrastructure
                                                                       15               of the House of Representatives and the Committee
                                                                       16               on Environment and Public Works of the Senate a
                                                                       17               report detailing—
                                                                       18                                  (A) the results of the study authorized by
                                                                       19                         this section;
                                                                       20                                  (B) any additional, site-specific areas with-
                                                                       21                         in the Lower Missouri River Basin for which
                                                                       22                         additional study for flood risk management
                                                                       23                         projects is recommended by the Secretary; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00115   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             116
                                                                         1                                 (C) any interim actions relating to existing
                                                                         2                        water resources development projects under-
                                                                         3                        taken by the Secretary during the study period.
                                                                         4              (b) DEFINITIONS.—In this section:
                                                                         5                        (1) LOWER MISSOURI BASIN STUDY.—The term
                                                                         6              ‘‘Lower Missouri Basin study’’ means the Lower
                                                                         7              Missouri Basin Flood Risk and Resiliency Study,
                                                                         8              Iowa, Kansas, Nebraska, and Missouri, authorized
                                                                         9              pursuant to section 216 of the Flood Control Act of
                                                                       10               1970 (33 U.S.C. 549a).
                                                                       11                         (2) SMALL                COMMUNITY.—The                          term ‘‘small
                                                                       12               community’’ means a local government that serves a
                                                                       13               population of less than 15,000.
                                                                       14      SEC. 213. PORTSMOUTH HARBOR AND PISCATAQUA RIVER

                                                                       15                              AND RYE HARBOR, NEW HAMPSHIRE.

                                                                       16               Not later than 180 days after the date of enactment
                                                                       17 of this Act, the Secretary shall submit to Congress a writ-
                                                                       18 ten status update regarding—
                                                                       19                         (1) efforts to address the impacts of shoaling
                                                                       20               affecting the project for navigation, Rye Harbor,
                                                                       21               New Hampshire, authorized by section 101 of the
                                                                       22               River and Harbor Act of 1960 (74 Stat. 480); and
                                                                       23                         (2) the project for navigation, Portsmouth Har-
                                                                       24               bor and Piscataqua River, authorized by section 101



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               of the River and Harbor Act of 1962 (76 Stat.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00116   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             117
                                                                         1              1173), as required to be expedited under section
                                                                         2              1317 of the Water Resources Development Act of
                                                                         3              2018 (Public Law 115–270).
                                                                         4     SEC. 214. COUGAR AND DETROIT DAMS, WILLAMETTE

                                                                         5                             RIVER BASIN, OREGON.

                                                                         6              (a) REPORT.—Not later than 2 years after the date
                                                                         7 of enactment of this Act, the Secretary shall submit to
                                                                         8 the Committee on Transportation and Infrastructure of
                                                                         9 the House of Representatives and the Committee on Envi-
                                                                       10 ronment and Public Works of the Senate, and make pub-
                                                                       11 licly available, a report providing an initial analysis of
                                                                       12 deauthorizing hydropower as a project purpose at the Cou-
                                                                       13 gar and Detroit Dams project.
                                                                       14               (b) CONTENTS.—The Secretary shall include in the
                                                                       15 report submitted under subsection (a)—
                                                                       16                         (1) a description of the potential effects of
                                                                       17               deauthorizing hydropower as a project purpose at
                                                                       18               the Cougar and Detroit Dams project on—
                                                                       19                                  (A) the operation of the project, including
                                                                       20                         with respect to the other authorized purposes of
                                                                       21                         the project;
                                                                       22                                  (B) compliance of the project with the En-
                                                                       23                         dangered Species Act;




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00117   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             118
                                                                         1                                 (C) costs that would be attributed to other
                                                                         2                        authorized purposes of the project, including
                                                                         3                        costs relating to compliance with such Act; and
                                                                         4                                 (D) other ongoing studies in the Willam-
                                                                         5                        ette River Basin; and
                                                                         6                        (2) identification of any further research need-
                                                                         7              ed.
                                                                         8              (c) PROJECT DEFINED.—In this section, the terms
                                                                         9 ‘‘Cougar and Detroit Dams project’’ and ‘‘project’’ mean
                                                                       10 the Cougar Dam and Reservoir project and Detroit Dam
                                                                       11 and Reservoir project, Willamette River Basin, Oregon,
                                                                       12 authorized by section 204 of the Flood Control Act of
                                                                       13 1950 (64 Stat. 179).
                                                                       14      SEC. 215. PORT ORFORD, OREGON.

                                                                       15               Not later than 180 days after the date of enactment
                                                                       16 of this Act, the Secretary shall, at Federal expense, submit
                                                                       17 to the Committee on Transportation and Infrastructure
                                                                       18 of the House of Representatives and the Committee on
                                                                       19 Environment and Public Works of the Senate a summary
                                                                       20 report on the research completed and data gathered by
                                                                       21 the date of enactment of this Act with regards to the con-
                                                                       22 figuration of a breakwater for the project for navigation,
                                                                       23 Port Orford, Oregon, authorized by section 117 of the
                                                                       24 River and Harbor Act of 1970 (84 Stat. 1822; 106 Stat.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00118   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             119
                                                                         1 4809), for the purposes of addressing shoaling issues to
                                                                         2 minimize long-term maintenance costs.
                                                                         3     SEC. 216. WILSON CREEK AND SLOAN CREEK, FAIRVIEW,

                                                                         4                             TEXAS.

                                                                         5              Not later than 180 days after the date of enactment
                                                                         6 of this section, the Secretary shall submit to Congress a
                                                                         7 written status update regarding efforts to address flooding
                                                                         8 along Wilson Creek and Sloan Creek in the City of Fair-
                                                                         9 view, Texas.
                                                                       10      SEC. 217. GAO STUDY ON MITIGATION FOR WATER RE-

                                                                       11                              SOURCES DEVELOPMENT PROJECTS.

                                                                       12               Not later than 18 months after the date of enactment
                                                                       13 of this Act, the Comptroller General of the United States
                                                                       14 shall—
                                                                       15                         (1) conduct a study on the mitigation of the im-
                                                                       16               pact of water resources development projects, includ-
                                                                       17               ing the impact on fish and wildlife, consistent with
                                                                       18               the requirements of section 906 of the Water Re-
                                                                       19               sources Development Act of 1986 (33 U.S.C. 2283),
                                                                       20               section 307(a) of the Water Resources Development
                                                                       21               Act of 1990 (33 U.S.C. 2317(a)), and section
                                                                       22               2036(b) of the Water Resources Development Act of
                                                                       23               2007 (33 U.S.C. 2283a), including—
                                                                       24                                  (A) an evaluation of guidance or instruc-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         tions issued, and other measures taken, by the


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00119   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             120
                                                                         1                        Secretary to ensure successful mitigation of
                                                                         2                        such impacts;
                                                                         3                                 (B) a review of the methods of mitigation,
                                                                         4                        including the use of in-lieu fees, mitigation
                                                                         5                        banking, and permittee-responsible mitigation,
                                                                         6                        and their long-term effectiveness of restoring or
                                                                         7                        mitigating ecosystem services impacted by such
                                                                         8                        projects;
                                                                         9                                 (C) a review of how the use of the different
                                                                       10                         mitigation methods for such projects varies
                                                                       11                         across Corps of Engineers districts;
                                                                       12                                  (D) an assessment of the backlog of miti-
                                                                       13                         gation projects, including the number of mitiga-
                                                                       14                         tion projects pending completion to address
                                                                       15                         such impacts resulting from constructed water
                                                                       16                         resources development projects;
                                                                       17                                  (E) an evaluation of how the Secretary
                                                                       18                         tracks compliance with the mitigation require-
                                                                       19                         ments across Corps of Engineers districts;
                                                                       20                                  (F) a review of how the mitigation require-
                                                                       21                         ments for water resources development projects
                                                                       22                         contributes to the resilience of water resources
                                                                       23                         in the United States;
                                                                       24                                  (G) an assessment of whether mitigation is



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         being done prior to or contemporaneously with


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00120   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             121
                                                                         1                        the construction of projects, as required by sec-
                                                                         2                        tion 906 of the Water Resources Development
                                                                         3                        Act of 1986 (33 U.S.C. 2283);
                                                                         4                                 (H) an evaluation of compliance with sec-
                                                                         5                        tion 906(d) of the Water Resources Develop-
                                                                         6                        ment Act of 1986 (33 U.S.C. 2283(d)) for the
                                                                         7                        development of specific mitigation plans for
                                                                         8                        projects, whether such plans were successful in
                                                                         9                        mitigating the designated impacts of the
                                                                       10                         projects, and, in instances where such plans
                                                                       11                         were not successful, what actions the Secretary
                                                                       12                         is taking to modify the plans such that they will
                                                                       13                         be successful; and
                                                                       14                                  (I) an assessment of how the Secretary
                                                                       15                         might take advantage of natural infrastructure
                                                                       16                         in mitigation planning to reduce flood risks and
                                                                       17                         flood recovery costs for some communities; and
                                                                       18                         (2) submit to Congress a report that—
                                                                       19                                  (A) describes the results of the study con-
                                                                       20                         ducted under paragraph (1);
                                                                       21                                  (B) includes recommendations to ensure
                                                                       22                         compliance with and successful implementation
                                                                       23                         of mitigation requirements for water resources
                                                                       24                         development projects; and



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00121   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             122
                                                                         1                                 (C) includes recommendations to ensure
                                                                         2                        existing programs and authorities include the
                                                                         3                        use, to the maximum extent practicable, of nat-
                                                                         4                        ural infrastructure.
                                                                         5     SEC. 218. GAO STUDY ON APPLICATION OF HARBOR MAIN-

                                                                         6                             TENANCE TRUST FUND EXPENDITURES.

                                                                         7              (a) STUDY.—Not later than 18 months after the date
                                                                         8 of enactment of this Act, the Comptroller General of the
                                                                         9 United States shall conduct a study of the operation and
                                                                       10 maintenance needs of federally authorized harbor and in-
                                                                       11 land harbor projects, including—
                                                                       12                         (1) an inventory of all federally authorized har-
                                                                       13               bor and inland harbor projects;
                                                                       14                         (2) an assessment of current uses of such
                                                                       15               projects (and, to the extent practicable, the national,
                                                                       16               regional, and local benefits of such uses), including
                                                                       17               the uses listed in section 210(d)(2)(B) of the Water
                                                                       18               Resources Development Act of 1986;
                                                                       19                         (3) an assessment of the annual operation and
                                                                       20               maintenance needs associated with harbors and in-
                                                                       21               land harbors referred to in subsection (a)(2) of sec-
                                                                       22               tion 210 of the Water Resources Development Act
                                                                       23               of 1986 (33 U.S.C. 2238), including a breakdown of
                                                                       24               such needs for each of the following types of



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               projects—


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00122   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             123
                                                                         1                                 (A) emerging harbor projects (as defined
                                                                         2                        in such section);
                                                                         3                                 (B) moderate-use harbor projects (as de-
                                                                         4                        fined in such section on the day before the date
                                                                         5                        of enactment of this Act);
                                                                         6                                 (C) high-use harbor projects (as defined in
                                                                         7                        such section on the day before the date of en-
                                                                         8                        actment of this Act); and
                                                                         9                                 (D) projects assigned to harbors and in-
                                                                       10                         land harbors within the Great Lakes Navigation
                                                                       11                         System (as defined in such section);
                                                                       12                         (4) an assessment of any deferred operation
                                                                       13               and maintenance needs for such projects;
                                                                       14                         (5) an assessment of the annual funding level
                                                                       15               trends for moderate-use harbor projects (as defined
                                                                       16               in section 210 of the Water Resources Development
                                                                       17               Act of 1986 on the day before the date of enactment
                                                                       18               of this Act) after the date of enactment of the Water
                                                                       19               Resources Development Act of 2014 (Public Law
                                                                       20               113–121), excluding funds awarded to donor ports,
                                                                       21               medium-sized donor ports, and energy transfer ports
                                                                       22               (as such terms are defined in section 2106 of the
                                                                       23               Water Resources Reform and Development Act of
                                                                       24               2014 (33 U.S.C. 2201));



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00123   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             124
                                                                         1                        (6) an assessment of projected needs associated
                                                                         2              with donor ports, medium-sized donor ports, and en-
                                                                         3              ergy transfer ports (as such terms are defined in
                                                                         4              section 2106 of the Water Resources Reform and
                                                                         5              Development Act of 2014 (33 U.S.C. 2201)); and
                                                                         6                        (7) an itemization of expenditures provided to
                                                                         7              donor ports, medium-sized donor ports, and energy
                                                                         8              transfer ports under section 2106 of the Water Re-
                                                                         9              sources Reform and Development Act of 2014 (33
                                                                       10               U.S.C. 2201).
                                                                       11               (b) REPORT TO CONGRESS.—Upon completion of the
                                                                       12 report under subsection (a), the Comptroller General shall
                                                                       13 submit such report to the Committee on Transportation
                                                                       14 and Infrastructure of the House of Representatives and
                                                                       15 the Committee on Environment and Public Works of the
                                                                       16 Senate.
                                                                       17      SEC. 219. GAO STUDY ON ADMINISTRATION OF ENVIRON-

                                                                       18                              MENTAL BANKS.

                                                                       19               (a) IN GENERAL.—Not later than one year after the
                                                                       20 date of enactment of this Act, the Comptroller General
                                                                       21 of the United States shall conduct a study and submit to
                                                                       22 the appropriate committees of Congress a report that ana-
                                                                       23 lyzes the administration of section 309 of the Coastal Wet-
                                                                       24 lands Planning, Protection and Restoration Act to estab-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00124   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             125
                                                                         1 lish an environmental bank (as defined in such section),
                                                                         2 such that the Secretary—
                                                                         3                        (1) achieves the objectives of the report of the
                                                                         4              Chief of Engineers for ecosystem restoration in the
                                                                         5              Louisiana Coastal Area or the objectives of the com-
                                                                         6              prehensive coastal protection master plan entitled
                                                                         7              ‘‘Louisiana Comprehensive Master Plan for a Sus-
                                                                         8              tainable Coast’’ prepared by the State of Louisiana
                                                                         9              and accepted by the Louisiana Coastal Protection
                                                                       10               and Restoration Authority (including any subsequent
                                                                       11               amendments or revisions);
                                                                       12                         (2) promotes ridge restoration, barrier island
                                                                       13               restoration, marsh creation, nonstructural risk man-
                                                                       14               agement, or any other projects authorized, funded,
                                                                       15               or undertaken, or proposed to be authorized, funded,
                                                                       16               or undertaken, pursuant to such comprehensive
                                                                       17               coastal protection master plan;
                                                                       18                         (3) allows for proactive investment in projects
                                                                       19               by a public or private entity seeking to generate
                                                                       20               credits to satisfy responsibilities associated with en-
                                                                       21               vironmental compliance;
                                                                       22                         (4) allows for leveraging additional State, Par-
                                                                       23               ish, or Federal funds; and




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00125   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             126
                                                                         1                        (5) recommends methods for awarding addi-
                                                                         2              tional credit for high-priority projects listed in the
                                                                         3              report and plan described in paragraph (1).
                                                                         4              (b) CONSULTATION WITH STAKEHOLDERS.—In car-
                                                                         5 rying out subsection (a), the Comptroller General of the
                                                                         6 United States shall consult with the Secretary, the Lou-
                                                                         7 isiana Coastal Wetlands Conservation and Restoration
                                                                         8 Task Force, the Governor of Louisiana (or an appointee),
                                                                         9 and other stakeholders, to the extent practicable.
                                                                       10      SEC. 220. STUDY ON CORPS OF ENGINEERS CONCES-

                                                                       11                              SIONAIRE AGREEMENTS.

                                                                       12               (a) STUDY.—Not later than 1 year after the date of
                                                                       13 enactment of this Act, the Comptroller General of the
                                                                       14 United States shall conduct, and submit to the Committee
                                                                       15 on Transportation and Infrastructure of the House of
                                                                       16 Representatives and the Committee on Environment and
                                                                       17 Public Works of the Senate a report on the results of,
                                                                       18 a study on commercial concessionaires at Corps of Engi-
                                                                       19 neers recreational facilities.
                                                                       20               (b) REQUIREMENTS.—The study under subsection
                                                                       21 (a) shall include—
                                                                       22                         (1) an analysis of Corps of Engineers policies
                                                                       23               as they relate to the pricing of items sold by com-
                                                                       24               mercial concessionaires at Corps of Engineers rec-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00126   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             127
                                                                         1              reational facilities, including commoditized goods
                                                                         2              such as fuel and food items;
                                                                         3                        (2) an assessment of the impact of gross rev-
                                                                         4              enue fees on—
                                                                         5                                 (A) the sales of items described in para-
                                                                         6                        graph (1);
                                                                         7                                 (B) the total revenues collected by com-
                                                                         8                        mercial concessionaires at Corps of Engineers
                                                                         9                        recreational facilities; and
                                                                       10                                  (C) the amounts of the moneys paid by
                                                                       11                         such concessionaires to the United States—
                                                                       12                                          (i) amounts equivalent to which are
                                                                       13                                  appropriated to the Corps of Engineers for
                                                                       14                                  operation and maintenance of recreational
                                                                       15                                  facilities; or
                                                                       16                                          (ii) that are distributed to States and
                                                                       17                                  counties under section 7 of the Act of Au-
                                                                       18                                  gust 18, 1941 (33 U.S.C. 701c–3);
                                                                       19                         (3) an assessment of the potential impact of
                                                                       20               using a fixed revenue fee on the sales, revenues, and
                                                                       21               amounts described in paragraph (2);
                                                                       22                         (4) an analysis of Corps of Engineers policies
                                                                       23               related to the length of commercial concessionaire
                                                                       24               contracts;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00127   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             128
                                                                         1                        (5) an assessment of the impacts of changing
                                                                         2              the length of commercial concessionaire contracts to
                                                                         3              a minimum of 25 years, including assessment of—
                                                                         4                                 (A) the potential effects on monetary in-
                                                                         5                        vestment in Corps of Engineers properties by
                                                                         6                        commercial concessionaires, including whether
                                                                         7                        establishing such a minimum contract length
                                                                         8                        would lead to increased investment; and
                                                                         9                                 (B) whether establishing such a minimum
                                                                       10                         contract length would reduce competition, or re-
                                                                       11                         sult in commercial concessionaires providing
                                                                       12                         less value to the public or to water resources
                                                                       13                         development projects; and
                                                                       14                         (6) an assessment of whether changes in the
                                                                       15               concessionaire fee structure or the minimum length
                                                                       16               of a commercial concessionaire contract is in the
                                                                       17               public interest.
                                                                       18      SEC. 221. STUDY ON WATER SUPPLY AND WATER CON-

                                                                       19                              SERVATION AT WATER RESOURCES DEVEL-

                                                                       20                              OPMENT PROJECTS.

                                                                       21               (a) IN GENERAL.—Not later than 18 months after
                                                                       22 the date of enactment of this Act, the Secretary shall sub-
                                                                       23 mit to the Committee on Transportation and Infrastruc-
                                                                       24 ture of the House of the Representatives and the Com-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 mittee on Environment and Public Works of the Senate


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00128   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             129
                                                                         1 a report that analyzes the benefits and consequences of
                                                                         2 including municipal water supply and water conservation
                                                                         3 as a primary mission of the Corps of Engineers in carrying
                                                                         4 out water resources development projects.
                                                                         5              (b) INCLUSION.—The Secretary shall include in the
                                                                         6 report submitted under subsection (a)—
                                                                         7                        (1) a description of existing water resources de-
                                                                         8              velopment projects with municipal water supply or
                                                                         9              water conservation as authorized purposes, and the
                                                                       10               extent to which such projects are utilized for such
                                                                       11               purposes;
                                                                       12                         (2) a description of existing water resources de-
                                                                       13               velopment projects with respect to which—
                                                                       14                                  (A) municipal water supply or water con-
                                                                       15                         servation could be added as a project purpose,
                                                                       16                         including those with respect to which a non-
                                                                       17                         Federal interest has expressed an interest in
                                                                       18                         adding municipal water supply or water con-
                                                                       19                         servation as a project purpose; and
                                                                       20                                  (B) such a purpose could be accommodated
                                                                       21                         while maintaining existing authorized purposes;
                                                                       22                         (3) a description of ongoing water resources de-
                                                                       23               velopment project studies the authorizations for
                                                                       24               which include authorization for the Secretary to



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               study the feasibility of carrying out the project with


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00129   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             130
                                                                         1              a purpose of municipal water supply or water con-
                                                                         2              servation;
                                                                         3                        (4) an analysis of how adding municipal water
                                                                         4              supply and water conservation as a primary mission
                                                                         5              of the Corps of Engineers would affect the ability of
                                                                         6              the Secretary to carry out future water resources de-
                                                                         7              velopment projects; and
                                                                         8                        (5) any recommendations of the Secretary relat-
                                                                         9              ing to including municipal water supply and water
                                                                       10               conservation as a primary mission of the Corps of
                                                                       11               Engineers.
                                                                       12      SEC. 222. PFAS REVIEW AND INVENTORY AT CORPS FACILI-

                                                                       13                              TIES.

                                                                       14               (a) INVENTORY OF PFAS AT CORPS FACILITIES.—
                                                                       15                         (1) IN GENERAL.—Not later than 18 months
                                                                       16               after the date of enactment of this section, and an-
                                                                       17               nually thereafter the Secretary shall complete an in-
                                                                       18               ventory of Corps of Engineers civil works facilities
                                                                       19               that are or may be contaminated, or could become
                                                                       20               contaminated, by PFAS.
                                                                       21                         (2) CONTENTS                    OF INVENTORY.—In                         carrying
                                                                       22               out this subsection, the Secretary shall review and
                                                                       23               identify—
                                                                       24                                  (A) all facilities owned or operated by the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         Corps of Engineers, for which there is a civil


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00130   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             131
                                                                         1                        works function, that are or may be contami-
                                                                         2                        nated, or could become contaminated, by
                                                                         3                        PFAS;
                                                                         4                                 (B) the nature and extent of any such con-
                                                                         5                        tamination or potential for contamination, in-
                                                                         6                        cluding any potential pathways for human expo-
                                                                         7                        sure to PFAS;
                                                                         8                                 (C) response measures taken to monitor,
                                                                         9                        control, remove, or remediate PFAS, or other-
                                                                       10                         wise reduce the risk of human exposure to
                                                                       11                         PFAS;
                                                                       12                                  (D) for facilities identified under subpara-
                                                                       13                         graph (A), the extent to which such facilities
                                                                       14                         (or any such contamination or potential for con-
                                                                       15                         tamination at such facilities) are related to the
                                                                       16                         civil works functions of the Corps of Engineers;
                                                                       17                                  (E) the extent to which the Secretary, or
                                                                       18                         other entities, may have responsibility for such
                                                                       19                         contamination or potential for contamination;
                                                                       20                         and
                                                                       21                                  (F) for facilities identified under subpara-
                                                                       22                         graph (A), the costs to remediate and reduce
                                                                       23                         the risk of human exposure to PFAS.
                                                                       24                         (3) COORDINATION



kjohnson on DSK79L0C42PROD with BILLS
                                                                                                                                              WITH      OTHER              FEDERAL

                                                                       25               AGENCIES.—To the maximum extent practicable, the



                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00131   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             132
                                                                         1              actions taken under this subsection shall supplement
                                                                         2              and support work undertaken by other Federal
                                                                         3              agencies, including actions taken pursuant to the
                                                                         4              plan published by the Administrator of the Environ-
                                                                         5              mental Protection Agency, titled ‘‘EPA’s Per- and
                                                                         6              Polyfluoroalkyl Substances (PFAS) Action Plan’’
                                                                         7              and dated February 2019.
                                                                         8                        (4) REPORT TO CONGRESS.—Upon completion
                                                                         9              of the inventory under paragraph (1), and annually
                                                                       10               thereafter concurrent with the President’s annual
                                                                       11               budget request to Congress, the Secretary shall sub-
                                                                       12               mit the inventory to the Committee on Transpor-
                                                                       13               tation and Infrastructure of the House of Represent-
                                                                       14               atives and the Committee on Environment and Pub-
                                                                       15               lic Works of the Senate.
                                                                       16               (b) PFAS TECHNOLOGY RESEARCH.—
                                                                       17                         (1) RESEARCH SUPPORT.—The Secretary, act-
                                                                       18               ing through the Hazardous Waste Research Center
                                                                       19               located at the Engineer Research and Development
                                                                       20               Center, shall, to the maximum extent practicable,
                                                                       21               support the efforts of other Federal agencies in the
                                                                       22               development of innovative technologies and meth-
                                                                       23               odologies for the detection, treatment, and cleanup
                                                                       24               of PFAS associated with Federal facilities, including



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               groundwater associated with such facilities.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00132   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             133
                                                                         1                        (2) DUPLICATION                     OF EFFORTS.—Nothing                  in
                                                                         2              this subsection is intended to duplicate the activities
                                                                         3              undertaken by other Federal agencies as identified
                                                                         4              in subsection (a)(3).
                                                                         5              (c) DEFINITION.—In this section, the term ‘‘PFAS’’
                                                                         6 means a perfluoroalkyl substance or polyfluoroalkyl sub-
                                                                         7 stance with at least one fully fluorinated carbon atom.
                                                                         8     SEC. 223. REPORT ON RECREATIONAL FACILITIES.

                                                                         9              No later than 18 months after the date of enactment
                                                                       10 of this Act, the Secretary shall submit to the Committee
                                                                       11 on Transportation and Infrastructure of the House of
                                                                       12 Representatives and the Committee on Environment and
                                                                       13 Public Works of the Senate a report that contains—
                                                                       14                         (1) an inventory of all recreational infrastruc-
                                                                       15               ture and facilities associated with water resources
                                                                       16               development projects;
                                                                       17                         (2) an assessment of the annual operation and
                                                                       18               maintenance needs associated with such infrastruc-
                                                                       19               ture and facilities;
                                                                       20                         (3) an assessment of deferred operation and
                                                                       21               maintenance needs for such infrastructure and facili-
                                                                       22               ties to operate safely at full capacity; and
                                                                       23                         (4) an assessment of the economic benefits of
                                                                       24               recreation to local and regional economies and bene-



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00133   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             134
                                                                         1              fits of sustaining and improving public access at rec-
                                                                         2              reational infrastructure and facilities.
                                                                         3         TITLE III—DEAUTHORIZATIONS
                                                                         4             AND MODIFICATIONS
                                                                         5     SEC. 301. DEAUTHORIZATION OF INACTIVE PROJECTS.

                                                                         6              (a) PURPOSES.—The purposes of this section are—
                                                                         7                        (1) to identify water resources development
                                                                         8              projects authorized by Congress that are no longer
                                                                         9              viable for construction due to—
                                                                       10                                  (A) a lack of local support;
                                                                       11                                  (B) a lack of available Federal or non-Fed-
                                                                       12                         eral resources; or
                                                                       13                                  (C) an authorizing purpose that is no
                                                                       14                         longer relevant or feasible;
                                                                       15                         (2) to create an expedited and definitive process
                                                                       16               for Congress to deauthorize water resources develop-
                                                                       17               ment projects that are no longer viable for construc-
                                                                       18               tion; and
                                                                       19                         (3) to allow the continued authorization of
                                                                       20               water resources development projects that are viable
                                                                       21               for construction.
                                                                       22               (b) PROPOSED DEAUTHORIZATION LIST.—
                                                                       23                         (1) PRELIMINARY LIST OF PROJECTS.—
                                                                       24                                  (A) IN GENERAL.—The Secretary shall de-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         velop a preliminary list of each water resources


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00134   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             135
                                                                         1                        development project, or separable element of a
                                                                         2                        project, authorized for construction before No-
                                                                         3                        vember 8, 2007, for which—
                                                                         4                                         (i) planning, design, or construction
                                                                         5                                 was not initiated before the date of enact-
                                                                         6                                 ment of this Act; or
                                                                         7                                         (ii) planning, design, or construction
                                                                         8                                 was initiated before the date of enactment
                                                                         9                                 of this Act, but for which no funds, Fed-
                                                                       10                                  eral or non-Federal, were obligated for
                                                                       11                                  planning, design, or construction of the
                                                                       12                                  project or separable element of the project
                                                                       13                                  during the current fiscal year or any of the
                                                                       14                                  10 preceding fiscal years.
                                                                       15                                  (B) USE OF COMPREHENSIVE CONSTRUC-
                                                                       16                         TION BACKLOG AND OPERATION AND MAINTE-

                                                                       17                         NANCE REPORT.—The                            Secretary may develop
                                                                       18                         the preliminary list from the comprehensive
                                                                       19                         construction backlog and operation and mainte-
                                                                       20                         nance reports developed pursuant to section
                                                                       21                         1001(b)(2) of the Water Resources Develop-
                                                                       22                         ment Act of 1986 (33 U.S.C. 579a).
                                                                       23                         (2) PREPARATION OF PROPOSED DEAUTHORIZA-
                                                                       24               TION LIST.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00135   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             136
                                                                         1                                 (A)         DEAUTHORIZATION                       AMOUNT.—The

                                                                         2                        Secretary shall prepare a proposed list of
                                                                         3                        projects for deauthorization comprised of a sub-
                                                                         4                        set of projects and separable elements identified
                                                                         5                        on the preliminary list developed under para-
                                                                         6                        graph (1) that have, in the aggregate, an esti-
                                                                         7                        mated Federal cost to complete that is at least
                                                                         8                        $10,000,000,000.
                                                                         9                                 (B) DETERMINATION OF FEDERAL COST
                                                                       10                         TO COMPLETE.—For purposes of subparagraph

                                                                       11                         (A), the Federal cost to complete shall take into
                                                                       12                         account any allowances authorized by section
                                                                       13                         902 of the Water Resources Development Act
                                                                       14                         of 1986 (33 U.S.C. 2280), as applied to the
                                                                       15                         most recent project schedule and cost estimate.
                                                                       16                                  (C) INCLUSION OF DEAUTHORIZATION OF
                                                                       17                         ANTIQUATED PROJECTS.—The                                   Secretary shall
                                                                       18                         reduce the amount identified for deauthoriza-
                                                                       19                         tion under paragraph (2)(A) by an amount
                                                                       20                         equivalent to the estimated current value of
                                                                       21                         each project, or separable element of a project,
                                                                       22                         that is deauthorized by subsection (f).
                                                                       23                         (3) SEQUENCING OF PROJECTS.—
                                                                       24                                  (A) IN          GENERAL.—The                     Secretary shall



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         identify projects and separable elements for in-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00136   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             137
                                                                         1                        clusion on the proposed list of projects for de-
                                                                         2                        authorization under paragraph (2) according to
                                                                         3                        the order in which the projects and separable
                                                                         4                        elements were authorized, beginning with the
                                                                         5                        earliest authorized projects and separable ele-
                                                                         6                        ments and ending with the latest project or sep-
                                                                         7                        arable element necessary to meet the aggregate
                                                                         8                        amount under paragraph (2)(A).
                                                                         9                                 (B) FACTORS                  TO CONSIDER.—The                   Sec-
                                                                       10                         retary may identify projects and separable ele-
                                                                       11                         ments in an order other than that established
                                                                       12                         by subparagraph (A) if the Secretary deter-
                                                                       13                         mines, on a case-by-case basis, that a project or
                                                                       14                         separable element is critical for interests of the
                                                                       15                         United States, based on the possible impact of
                                                                       16                         the project or separable element on public
                                                                       17                         health and safety, the national economy, or the
                                                                       18                         environment.
                                                                       19                         (4) PUBLIC COMMENT AND CONSULTATION.—
                                                                       20                                  (A) IN GENERAL.—The Secretary shall so-
                                                                       21                         licit comments from the public and the Gov-
                                                                       22                         ernors of each applicable State on the proposed
                                                                       23                         deauthorization list prepared under paragraph
                                                                       24                         (2)(A).



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00137   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             138
                                                                         1                                 (B) COMMENT PERIOD.—The public com-
                                                                         2                        ment period shall be 90 days.
                                                                         3                        (5) PREPARATION OF FINAL DEAUTHORIZATION
                                                                         4              LIST.—

                                                                         5                                 (A) IN          GENERAL.—The                     Secretary shall
                                                                         6                        prepare a final deauthorization list by—
                                                                         7                                         (i) considering any comments received
                                                                         8                                 under paragraph (4); and
                                                                         9                                         (ii) revising the proposed deauthoriza-
                                                                       10                                  tion list prepared under paragraph (2)(A)
                                                                       11                                  as the Secretary determines necessary to
                                                                       12                                  respond to such comments.
                                                                       13                                  (B) APPENDIX.—The Secretary shall in-
                                                                       14                         clude as part of the final deauthorization list an
                                                                       15                         appendix that—
                                                                       16                                          (i) identifies each project or separable
                                                                       17                                  element on the proposed deauthorization
                                                                       18                                  list that is not included on the final de-
                                                                       19                                  authorization list; and
                                                                       20                                          (ii) describes the reasons why the
                                                                       21                                  project or separable element is not in-
                                                                       22                                  cluded on the final deauthorization list.
                                                                       23               (c) SUBMISSION OF FINAL DEAUTHORIZATION LIST
                                                                       24      TO CONGRESS FOR CONGRESSIONAL REVIEW; PUBLICA-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25      TION.—



                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00138   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             139
                                                                         1                        (1) IN GENERAL.—Not later than 90 days after
                                                                         2              the date of the close of the comment period under
                                                                         3              subsection (b)(4), the Secretary shall—
                                                                         4                                 (A) submit the final deauthorization list
                                                                         5                        and appendix prepared under subsection (b)(5)
                                                                         6                        to the Committee on Transportation and Infra-
                                                                         7                        structure of the House of Representatives and
                                                                         8                        the Committee on Environment and Public
                                                                         9                        Works of the Senate; and
                                                                       10                                  (B) publish the final deauthorization list
                                                                       11                         and appendix in the Federal Register.
                                                                       12                         (2) EXCLUSIONS.—The Secretary shall not in-
                                                                       13               clude in the final deauthorization list submitted
                                                                       14               under paragraph (1) any project or separable ele-
                                                                       15               ment with respect to which Federal funds for plan-
                                                                       16               ning, design, or construction are obligated after the
                                                                       17               development of the preliminary list under subsection
                                                                       18               (b)(1)(A) but prior to the submission of the final de-
                                                                       19               authorization list under paragraph (1)(A) of this
                                                                       20               subsection.
                                                                       21               (d) DEAUTHORIZATION; CONGRESSIONAL REVIEW.—
                                                                       22                         (1) IN GENERAL.—After the expiration of the
                                                                       23               2-year period beginning on the date of publication of
                                                                       24               the final deauthorization list and appendix under



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               subsection (c)(1)(B), a project or separable element


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00139   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             140
                                                                         1              of a project identified in the final deauthorization
                                                                         2              list is hereby deauthorized, unless Congress passes a
                                                                         3              joint resolution disapproving the final deauthoriza-
                                                                         4              tion list prior to the end of such period.
                                                                         5                        (2) NON-FEDERAL CONTRIBUTIONS.—
                                                                         6                                 (A) IN GENERAL.—A project or separable
                                                                         7                        element of a project identified in the final de-
                                                                         8                        authorization list under subsection (c) shall not
                                                                         9                        be deauthorized under this subsection if, before
                                                                       10                         the expiration of the 2-year period referred to
                                                                       11                         in paragraph (1), the non-Federal interest for
                                                                       12                         the project or separable element of the project
                                                                       13                         provides sufficient funds to complete the project
                                                                       14                         or separable element of the project.
                                                                       15                                  (B) TREATMENT OF PROJECTS.—Notwith-
                                                                       16                         standing subparagraph (A), each project and
                                                                       17                         separable element of a project identified in the
                                                                       18                         final deauthorization list shall be treated as de-
                                                                       19                         authorized for purposes of the aggregate de-
                                                                       20                         authorization amount specified in subsection
                                                                       21                         (b)(2)(A).
                                                                       22                         (3) PROJECTS IDENTIFIED IN APPENDIX.—A
                                                                       23               project or separable element of a project identified
                                                                       24               in the appendix to the final deauthorization list shall



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00140   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             141
                                                                         1              remain subject to future deauthorization by Con-
                                                                         2              gress.
                                                                         3              (e) SPECIAL RULES.—
                                                                         4                        (1) POST-AUTHORIZATION STUDIES.—A project
                                                                         5              or separable element of a project may not be identi-
                                                                         6              fied on the proposed deauthorization list developed
                                                                         7              under subsection (b), or the final deauthorization list
                                                                         8              developed under subsection (c), if the project or sep-
                                                                         9              arable element received funding for a post-authoriza-
                                                                       10               tion study during the current fiscal year or any of
                                                                       11               the 10 preceding fiscal years.
                                                                       12                         (2)       TREATMENT                   OF        PROJECT             MODIFICA-

                                                                       13               TIONS.—For purposes of this section, if an author-

                                                                       14               ized water resources development project or sepa-
                                                                       15               rable element of the project has been modified by an
                                                                       16               Act of Congress, the date of the authorization of the
                                                                       17               project or separable element shall be deemed to be
                                                                       18               the date of the most recent such modification.
                                                                       19               (f)           DEAUTHORIZATION                               OF             ANTIQUATED
                                                                       20 PROJECTS.—
                                                                       21                         (1) IN GENERAL.—Any water resources devel-
                                                                       22               opment project, or separable element of a project,
                                                                       23               authorized for construction prior to November 17,
                                                                       24               1986, for which construction has not been initiated



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               prior to the date of enactment of this Act, or for


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00141   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             142
                                                                         1              which funds have not been obligated for construction
                                                                         2              in the 10-year period prior to the date of enactment
                                                                         3              of this Act, is hereby deauthorized.
                                                                         4                        (2) IDENTIFICATION.—Not later than 60 days
                                                                         5              after the date of enactment of this Act, the Sec-
                                                                         6              retary shall issue to the Committee on Transpor-
                                                                         7              tation and Infrastructure of the House of Represent-
                                                                         8              atives and the Committee on Environment and Pub-
                                                                         9              lic Works of the Senate a report that identifies—
                                                                       10                                  (A) the name of each project, or separable
                                                                       11                         element of a project, deauthorized by paragraph
                                                                       12                         (1); and
                                                                       13                                  (B) the estimated current value of each
                                                                       14                         such project or separable element of a project.
                                                                       15               (g) ECONOMIC AND ENVIRONMENTAL REVIEW OF IN-
                                                                       16      ACTIVE WATER RESOURCES DEVELOPMENT PROJECTS.—

                                                                       17 The Secretary or the non-Federal interest may not carry
                                                                       18 out any authorized water resources development project,
                                                                       19 or separable element of such project, for which construc-
                                                                       20 tion has not been initiated in the 20-year period following
                                                                       21 the date of the authorization of such project or separable
                                                                       22 element, until—
                                                                       23                         (1) the Secretary provides to the Committee on
                                                                       24               Transportation and Infrastructure of the House of



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               Representatives and the Committee on Environment


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00142   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             143
                                                                         1              and Public Works of the Senate a post-authorization
                                                                         2              change report that updates the economic and envi-
                                                                         3              ronmental analysis of the project or separable ele-
                                                                         4              ment; and
                                                                         5                        (2) the Committee on Transportation and In-
                                                                         6              frastructure of the House of Representatives and the
                                                                         7              Committee on Environment and Public Works of the
                                                                         8              Senate take appropriate action to address any modi-
                                                                         9              fications to the economic and environmental analysis
                                                                       10               for the project or separable element of the project
                                                                       11               contained in the post-authorization change report.
                                                                       12               (h) DEFINITIONS.—In this section:
                                                                       13                         (1) POST-AUTHORIZATION CHANGE REPORT.—
                                                                       14               The term ‘‘post-authorization change report’’ has
                                                                       15               the meaning given such term in section 1132(d) of
                                                                       16               the Water Resources Development Act of 2016 (33
                                                                       17               U.S.C. 2282e).
                                                                       18                         (2) POST-AUTHORIZATION STUDY.—The term
                                                                       19               ‘‘post-authorization study’’ means—
                                                                       20                                  (A) a feasibility report developed under
                                                                       21                         section 905 of the Water Resources Develop-
                                                                       22                         ment Act of 1986 (33 U.S.C. 2282);
                                                                       23                                  (B) a feasibility study, as defined in sec-
                                                                       24                         tion 105(d) of the Water Resources Develop-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         ment Act of 1986 (33 U.S.C. 2215(d)); or


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00143   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             144
                                                                         1                                 (C) a review conducted under section 216
                                                                         2                        of the Flood Control Act of 1970 (33 U.S.C.
                                                                         3                        549a), including an initial appraisal that—
                                                                         4                                         (i) demonstrates a Federal interest;
                                                                         5                                 and
                                                                         6                                         (ii) requires additional analysis for the
                                                                         7                                 project or separable element.
                                                                         8                        (3)         WATER               RESOURCES                   DEVELOPMENT

                                                                         9              PROJECT.—The term ‘‘water resources development

                                                                       10               project’’ includes an environmental infrastructure
                                                                       11               assistance project or program of the Corps of Engi-
                                                                       12               neers.
                                                                       13      SEC. 302. ABANDONED AND INACTIVE NONCOAL MINE RES-

                                                                       14                               TORATION.

                                                                       15               Section 560(f) of the Water Resources Development
                                                                       16 Act of 1999 (33 U.S.C. 2336(f)) is amended by striking
                                                                       17 ‘‘$20,000,000’’ and inserting ‘‘$30,000,000’’.
                                                                       18      SEC. 303. TRIBAL PARTNERSHIP PROGRAM.

                                                                       19               Section 203(b)(4) of the Water Resources Develop-
                                                                       20 ment Act of 2000 (33 U.S.C. 2269) is amended by strik-
                                                                       21 ing ‘‘$12,500,000’’ each place it appears and inserting
                                                                       22 ‘‘$15,000,000’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00144   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             145
                                                                         1     SEC. 304. LAKES PROGRAM.

                                                                         2              Section 602(a) of the Water Resources Development
                                                                         3 Act of 1986 (Public Law 99–662, 100 Stat. 4148; 110
                                                                         4 Stat. 3758; 113 Stat. 295; 121 Stat. 1076) is amended—
                                                                         5                        (1) in paragraph (27), by striking ‘‘and’’ at the
                                                                         6              end;
                                                                         7                        (2) in paragraph (28), by striking the period at
                                                                         8              the end and inserting a semicolon; and
                                                                         9                        (3) by adding at the end the following:
                                                                       10                         ‘‘(29) Ellis Pond and Guild Pond, Norwood,
                                                                       11               Massachusetts; and
                                                                       12                         ‘‘(30) Memorial Pond, Walpole, Massachu-
                                                                       13               setts.’’.
                                                                       14      SEC. 305. WATERCRAFT INSPECTION STATIONS.

                                                                       15               Section 104(d)(1)(A) of the River and Harbor Act
                                                                       16 of 1958 (33 U.S.C. 610(d)(1)(A)) is amended—
                                                                       17                         (1) in clause (ii), by striking ‘‘; and’’ and in-
                                                                       18               serting a semicolon;
                                                                       19                         (2) in clause (iii), by striking ‘‘Arizona River
                                                                       20               Basins.’’ and inserting ‘‘Arkansas River Basins;
                                                                       21               and’’; and
                                                                       22                         (3) by adding at the end the following:
                                                                       23                                          ‘‘(iv) to protect the Russian River
                                                                       24                                  Basin, California.’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00145   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             146
                                                                         1     SEC. 306. REHABILITATION OF CORPS OF ENGINEERS CON-

                                                                         2                             STRUCTED DAMS.

                                                                         3              Section 1177 of the Water Resources Development
                                                                         4 Act of 2016 (33 U.S.C. 467f–2 note) is amended—
                                                                         5                        (1) in subsection (e), by striking ‘‘$40,000,000’’
                                                                         6              and inserting ‘‘$60,000,000’’; and
                                                                         7                        (2) in subsection (f), by striking ‘‘$40,000,000’’
                                                                         8              and inserting ‘‘$60,000,000’’.
                                                                         9     SEC. 307. CHESAPEAKE BAY ENVIRONMENTAL RESTORA-

                                                                       10                              TION AND PROTECTION PROGRAM.

                                                                       11               (a) IN GENERAL.—Section 510 of the Water Re-
                                                                       12 sources Development Act of 1996 (Public Law 104–303,
                                                                       13 110 Stat. 3759; 121 Stat. 1202; 128 Stat. 1317) is
                                                                       14 amended—
                                                                       15                         (1) by redesignating subsection (h) as sub-
                                                                       16               section (i) and inserting after subsection (g) the fol-
                                                                       17               lowing:
                                                                       18               ‘‘(h) PROJECT CAP.—The total cost of a project car-
                                                                       19 ried out under this section may not exceed $15,000,000.’’;
                                                                       20 and
                                                                       21                         (2) in subsection (i) (as so redesignated), by
                                                                       22               striking                 ‘‘$40,000,000’’                        and                inserting
                                                                       23               ‘‘$60,000,000’’.
                                                                       24               (b) OUTREACH AND TRAINING.—The Secretary shall




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 conduct public outreach and workshops for non-Federal
                                                                       26 interests to provide information on the Chesapeake Bay
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00146   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             147
                                                                         1 environmental restoration and protection program estab-
                                                                         2 lished under section 510 of the Water Resources Develop-
                                                                         3 ment Act of 1996, including how to participate in the pro-
                                                                         4 gram.
                                                                         5     SEC. 308. UPPER MISSISSIPPI RIVER SYSTEM ENVIRON-

                                                                         6                              MENTAL MANAGEMENT PROGRAM.

                                                                         7              Section 1103(e) of the Water Resources Development
                                                                         8 Act of 1986 (33 U.S.C. 652(e)) is amended—
                                                                         9                        (1)         in         paragraph                 (3),        by          striking
                                                                       10               ‘‘$22,750,000’’ and inserting ‘‘$40,000,000’’; and
                                                                       11                         (2)         in         paragraph                 (4),        by          striking
                                                                       12               ‘‘$10,420,000’’ and inserting ‘‘$15,000,000’’.
                                                                       13      SEC. 309. MCCLELLAN-KERR ARKANSAS RIVER NAVIGA-

                                                                       14                               TION SYSTEM.

                                                                       15               Any Federal funds, regardless of the account from
                                                                       16 which the funds were provided, used to carry out construc-
                                                                       17 tion of the modification to the McClellan-Kerr Arkansas
                                                                       18 River Navigation System, authorized in section 136 of the
                                                                       19 Energy and Water Development Appropriations Act, 2004
                                                                       20 (117 Stat. 1842), shall be considered by the Secretary as
                                                                       21 initiating construction of the project such that future
                                                                       22 funds will not require a new investment decision.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00147   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             148
                                                                         1     SEC. 310. OUACHITA-BLACK RIVER NAVIGATION PROJECT,

                                                                         2                             ARKANSAS.

                                                                         3              The project for navigation, Ouachita-Black River, Ar-
                                                                         4 kansas, authorized by section 101 of the River and Harbor
                                                                         5 Act of 1960 (Public Law 86–645), is modified to include
                                                                         6 water supply as a project purpose, subject to completion
                                                                         7 by the Secretary of a feasibility study and any other review
                                                                         8 necessary for such modification.
                                                                         9     SEC.        311.     SACRAMENTO                    RIVER,        GLENN-COLUSA,              CALI-

                                                                       10                              FORNIA.

                                                                       11               The portion of project for flood control, Sacramento
                                                                       12 River, California, authorized by section 2 of the Act of
                                                                       13 March 1, 1917 (chapter 144, 39 Stat. 949; 103 Stat. 649;
                                                                       14 110 Stat. 3709; 112 Stat. 1841; 113 Stat. 299), con-
                                                                       15 sisting of a riverbed gradient restoration facility at the
                                                                       16 Glenn-Colusa Irrigation District Intake, is no longer au-
                                                                       17 thorized beginning on the date of enactment of this Act.
                                                                       18      SEC. 312. LAKE ISABELLA, CALIFORNIA.

                                                                       19               (a) SENSE OF CONGRESS.—It is the sense of Con-
                                                                       20 gress that the Secretary, when evaluating alternative loca-
                                                                       21 tions for construction of a permanent Isabella Lake Vis-
                                                                       22 itor Center by the Corps of Engineers to replace the facil-
                                                                       23 ity impacted by the Isabella Dam safety modification
                                                                       24 project, should afford substantial weight to the site pref-




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 erence of the local community.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00148   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             149
                                                                         1              (b) AUTHORITY.—The Secretary may acquire such
                                                                         2 interests in real property as the Secretary determines nec-
                                                                         3 essary or advisable to support construction of the Isabella
                                                                         4 Dam safety modification project.
                                                                         5              (c) TRANSFER.—The Secretary may transfer any real
                                                                         6 property interests acquired under subsection (b) to any
                                                                         7 other Federal agency or department without reimburse-
                                                                         8 ment.
                                                                         9              (d) ISABELLA DAM SAFETY MODIFICATION PROJECT
                                                                       10 DEFINED.—In this section, the term ‘‘Isabella Dam safety
                                                                       11 modification project’’ means the dam safety modification
                                                                       12 project at the Isabella Reservoir in the San Joaquin Val-
                                                                       13 ley, California (authorized by Act of December 22, 1944
                                                                       14 (chapter 665, 58 Stat. 901)), including the component of
                                                                       15 the project relating to construction a visitor center facility.
                                                                       16      SEC. 313. LOWER SAN JOAQUIN RIVER FLOOD CONTROL

                                                                       17                              PROJECT.

                                                                       18               The Secretary shall align the schedules of, and maxi-
                                                                       19 mize complimentary efforts, minimize duplicative prac-
                                                                       20 tices, and ensure coordination and information sharing
                                                                       21 with respect to—
                                                                       22                         (1) the project for flood risk management,
                                                                       23               Lower San Joaquin River, authorized by section
                                                                       24               1401(2) of the Water Resources Development Act of



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               2018 (132 Stat. 3836); and


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00149   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             150
                                                                         1                        (2) the second phase of the feasibility study for
                                                                         2              the Lower San Joaquin River project for flood risk
                                                                         3              management, authorized for expedited completion by
                                                                         4              section 1203(a)(7) of the Water Resources Develop-
                                                                         5              ment Act 2018 (132 Stat. 3803).
                                                                         6     SEC. 314. SAN DIEGO RIVER AND MISSION BAY, SAN DIEGO

                                                                         7                             COUNTY, CALIFORNIA.

                                                                         8              The portion of the project for flood control and navi-
                                                                         9 gation, San Diego River and Mission Bay, San Diego
                                                                       10 County, California, authorized by the Act of July 24, 1946
                                                                       11 (chapter 595, 60 Stat. 636), identified in the National
                                                                       12 Levee Database established under section 9004 of the
                                                                       13 Water Resources Development Act of 2007 (33 U.S.C.
                                                                       14 3303) as the San Diego River 3 segment and consisting
                                                                       15 of a 785-foot-long segment of the right bank levee from
                                                                       16 Station 209+41.75 to its end at Station 217+26.75, as
                                                                       17 described in construction plans dated August 30, 1951,
                                                                       18 is no longer authorized beginning on the date of enactment
                                                                       19 of this Act.
                                                                       20      SEC. 315. SAN FRANCISCO, CALIFORNIA, WATERFRONT

                                                                       21                              AREA.

                                                                       22               (a) IN GENERAL.—Section 114 of the River and Har-
                                                                       23 bor Act of 1968 (33 U.S.C. 59h) is amended to read as
                                                                       24 follows:



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00150   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             151
                                                                         1     ‘‘SEC. 114. SAN FRANCISCO, CALIFORNIA, WATERFRONT

                                                                         2                             AREA.

                                                                         3              ‘‘(a) AREA TO BE DECLARED NONNAVIGABLE.—The
                                                                         4 following area is declared to be nonnavigable waters of the
                                                                         5 United States: All of that portion of the City and County
                                                                         6 of San Francisco, California, lying shoreward of a line be-
                                                                         7 ginning at the intersection of the southerly right of way
                                                                         8 line of Earl Street prolongation with the Pierhead United
                                                                         9 States Government Pierhead line, the Pierhead line as de-
                                                                       10 fined in the State of California Harbor and Navigation
                                                                       11 Code Section 1770, as amended in 1961; thence northerly
                                                                       12 along said Pierhead line to its intersection with a line par-
                                                                       13 allel with and distant 10 feet easterly from, the existing
                                                                       14 easterly boundary line of Pier 30–32; thence northerly
                                                                       15 along said parallel line and its northerly prolongation, to
                                                                       16 a point of intersection with a line parallel with, and distant
                                                                       17 10 feet northerly from, the existing northerly boundary of
                                                                       18 Pier 30–32; thence westerly along last said parallel line
                                                                       19 to its intersection with said Pierhead line; thence northerly
                                                                       20 along said Pierhead line, to the intersection of the easterly
                                                                       21 right of way line of Van Ness Avenue, formerly Marlette
                                                                       22 Street, prolongation to the Pierhead line.
                                                                       23               ‘‘(b) REQUIREMENT THAT AREA BE IMPROVED.—
                                                                       24 The declaration of nonnavigability under subsection (a)




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 applies only to those parts of the area described in sub-
                                                                       26 section (a) that are or will be bulkheaded, filled, or other-
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00151   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             152
                                                                         1 wise occupied or covered by permanent structures and
                                                                         2 does not affect the applicability of any Federal statute or
                                                                         3 regulation that relates to filling of navigable waters or to
                                                                         4 other regulated activities within the area described in sub-
                                                                         5 section (a), including sections 9 and 10 of the Act of
                                                                         6 March 3, 1899 (33 U.S.C. 401, 403), section 404 of the
                                                                         7 Federal Water Pollution Control Act, and the National
                                                                         8 Environmental Policy Act of 1969.
                                                                         9              ‘‘(c) INCLUSION OF EMBARCADERO HISTORIC DIS-
                                                                       10      TRICT.—Congress                    finds and declares that the area de-
                                                                       11 scribed in subsection (a) contains the seawall, piers, and
                                                                       12 wharves that comprise the Embarcadero Historic District
                                                                       13 listed on the National Register of Historic Places on May
                                                                       14 12, 2006.’’.
                                                                       15               (b) CONFORMING AMENDMENT.—Section 5052 of the
                                                                       16 Water Resources Development Act of 2007 (33 U.S.C.
                                                                       17 59h–1) is repealed.
                                                                       18      SEC. 316. WESTERN PACIFIC INTERCEPTOR CANAL, SAC-

                                                                       19                              RAMENTO RIVER, CALIFORNIA.

                                                                       20               The portion of the project for flood protection on the
                                                                       21 Sacramento River, authorized by section 2 of the of March
                                                                       22 1, 1917 (chapter 144, 39 Stat. 949; 45 Stat. 539; 50 Stat.
                                                                       23 877; 55 Stat. 647; 80 Stat. 1422), consisting of the por-
                                                                       24 tion of the levee from GPS coordinate N2147673.584



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 E6690904.187 to N2147908.413 E6689057.060 associ-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00152   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             153
                                                                         1 ated with the Western Pacific Interceptor Canal, is no
                                                                         2 longer authorized beginning on the date of the enactment
                                                                         3 of this Act.
                                                                         4     SEC. 317. RIO GRANDE ENVIRONMENTAL MANAGEMENT

                                                                         5                              PROGRAM, COLORADO, NEW MEXICO, AND

                                                                         6                              TEXAS.

                                                                         7              Section 5056(f) of the Water Resources Development
                                                                         8 Act of 2007 (Public Law 110–114, 121 Stat. 1213; 128
                                                                         9 Stat. 1314) is amended by striking ‘‘2019’’ and inserting
                                                                       10 ‘‘2029’’.
                                                                       11      SEC. 318. NEW LONDON HARBOR WATERFRONT CHANNEL,

                                                                       12                               CONNECTICUT.

                                                                       13               (a) IN GENERAL.—The portion of the project for
                                                                       14 navigation, New London Harbor, Connecticut, authorized
                                                                       15 by the first section of the Act of June 13, 1902 (chapter
                                                                       16 1079, 32 Stat. 333), described in subsection (b) is no
                                                                       17 longer authorized beginning on the date of enactment of
                                                                       18 this Act.
                                                                       19               (b) AREA DESCRIBED.—The area referred to in sub-
                                                                       20 section (a) is generally the portion between and around
                                                                       21 the 2 piers at the State Pier in New London, specifically
                                                                       22 the area—
                                                                       23                         (1)       beginning              at         a    point           N691263.78,
                                                                       24               E1181259.26;



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00153   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             154
                                                                         1                        (2) running N 35°01’50.75’’ W about 955.59
                                                                         2              feet to a point N692046.26, E1180710.74;
                                                                         3                        (3) running N 54°58’06.78’’ E about 100.00
                                                                         4              feet to a point N692103.66, E1180792.62;
                                                                         5                        (4) running S 35°01’50.75’’ E about 989.8 feet
                                                                         6              to a point N691293.17, E1181360.78; and
                                                                         7                        (5) running S 73°51’15.45’’ W about 105.69
                                                                         8              feet to the point described in paragraph (1).
                                                                         9     SEC. 319. WASHINGTON HARBOR, DISTRICT OF COLUMBIA.

                                                                       10               Beginning on the date of enactment of this Act, the
                                                                       11 project for navigation, Washington Harbor, District of Co-
                                                                       12 lumbia, authorized by the Act of August 30, 1935 (chapter
                                                                       13 831, 49 Stat. 1031), is modified to reduce, in part, the
                                                                       14 authorized dimensions of the project, such that the re-
                                                                       15 maining authorized dimensions are as follows:
                                                                       16                         (1) A 200 foot wide, 15 foot deep channel with
                                                                       17               a center line beginning at a point East 1,317,064.30
                                                                       18               and North 440,373.32, thence to a point East
                                                                       19               1,316,474.30 and North 440,028.31, thence to a
                                                                       20               point East 1,315,584.30 and North 439,388.30,
                                                                       21               thence to a point East 1,315,259.31 and North
                                                                       22               438,908.30.
                                                                       23                         (2) A transition area 200 foot wide to 300 foot
                                                                       24               wide, 15 foot deep, with a center line beginning at



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00154   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             155
                                                                         1              a point East 1,315,259.31 and North 438,908.30 to
                                                                         2              a point East 1,315,044.31 and North 438,748.30.
                                                                         3                        (3) A 300 foot wide, 15 foot deep channel with
                                                                         4              a centerline beginning a point East 1,315,044.31
                                                                         5              and North 438,748.30, thence to a point East
                                                                         6              1,314,105.31 and North 438,124.79, thence to a
                                                                         7              point East 1,311,973.30 and North 438,807.78,
                                                                         8              thence to a point East 1,311,369.73 and North
                                                                         9              438,577.42, thence to a point East 1,311,015.73
                                                                       10               and North 438,197.57, thence to a point East
                                                                       11               1,309,713.47 and North 435,678.91.
                                                                       12                         (4) A transition area 300 foot wide to 400 foot
                                                                       13               wide, 15 foot deep to 24 foot deep, with a center line
                                                                       14               beginning at a point East 1,309,713.47 and North
                                                                       15               435,678.91 to a point East 1,307,709.33 and North
                                                                       16               434,488.25.
                                                                       17                         (5) A 400 foot wide, 24 foot deep channel with
                                                                       18               a centerline beginning at a point East 1,307,709.33
                                                                       19               and North 434,488.25, thence to a point East
                                                                       20               1,307,459.33 and North 434,173.25, thence to a
                                                                       21               point East 1,306,476.82 and North 1,306,476.82,
                                                                       22               thence to a point East 1,306,209.79 and North
                                                                       23               431,460.21, thence to a point at the end of the
                                                                       24               channel near Hains Point East 1,305,997.63 and



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               North 429,978.31.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00155   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             156
                                                                         1     SEC. 320. BIG CYPRESS SEMINOLE INDIAN RESERVATION

                                                                         2                             WATER CONSERVATION PLAN, FLORIDA.

                                                                         3              The project for ecosystem restoration, Big Cypress
                                                                         4 Seminole Indian Reservation Water Conservation Plan,
                                                                         5 Florida, authorized pursuant to section 528 of the Water
                                                                         6 Resources Development Act of 1996 (110 Stat. 3767), is
                                                                         7 no longer authorized beginning on the date of enactment
                                                                         8 of this Act.
                                                                         9     SEC. 321. CENTRAL EVERGLADES, FLORIDA.

                                                                       10               The project for ecosystem restoration, Central Ever-
                                                                       11 glades, authorized by section 1401(4) of the Water Re-
                                                                       12 sources Development Act of 2016 (130 Stat. 1713), is
                                                                       13 modified to include the project for ecosystem restoration,
                                                                       14 Central and Southern Florida, Everglades Agricultural
                                                                       15 Area, authorized by section 1308 of the Water Resources
                                                                       16 Development Act of 2018 (132 Stat. 3819), and to author-
                                                                       17 ize the Secretary to carry out the project as so combined.
                                                                       18      SEC. 322. MIAMI RIVER, FLORIDA.

                                                                       19               The portion of the project for navigation, Miami
                                                                       20 River, Florida, authorized by the Act of July 3, 1930 (46
                                                                       21 Stat. 925; 59 Stat. 16; 74 Stat. 481; 100 Stat. 4257),
                                                                       22 beginning at the existing railroad bascule bridge and ex-
                                                                       23 tending approximately 1,000 linear feet upstream to an
                                                                       24 existing salinity barrier and flood control structure, is no




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 longer authorized beginning on the date of enactment of
                                                                       26 this Act.
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00156   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             157
                                                                         1     SEC. 323. JULIAN KEEN, JR. LOCK AND DAM, MOORE

                                                                         2                             HAVEN, FLORIDA.

                                                                         3              (a) DESIGNATION.—The Moore Haven Lock and
                                                                         4 Dam, Moore Haven, Florida, authorized pursuant to the
                                                                         5 Act of August 30, 1935 (chapter 831, 49 Stat. 1032),
                                                                         6 shall hereafter be known and designated as the ‘‘Julian
                                                                         7 Keen, Jr. Lock and Dam’’.
                                                                         8              (b) REFERENCES.—Any reference in a law, map, reg-
                                                                         9 ulation, document, paper, or other record of the United
                                                                       10 States to the Lock and Dam referred to in subsection (a)
                                                                       11 shall be deemed to be a reference to the ‘‘Julian Keen,
                                                                       12 Jr. Lock and Dam’’.
                                                                       13      SEC. 324. TAYLOR CREEK RESERVOIR AND LEVEE L–73

                                                                       14                              (SECTION 1), UPPER ST. JOHNS RIVER BASIN,

                                                                       15                              FLORIDA.

                                                                       16               The portions of the project for flood control and other
                                                                       17 purposes, Central and Southern Florida, authorized by
                                                                       18 section 203 of the Flood Control Act of 1948 (62 Stat.
                                                                       19 1176), consisting of the Taylor Creek Reservoir and Levee
                                                                       20 L–73, Section 1, within the Upper St. Johns River Basin,
                                                                       21 Florida, are no longer authorized beginning on the date
                                                                       22 of enactment of this Act.
                                                                       23      SEC. 325. CALCASIEU RIVER AND PASS, LOUISIANA.

                                                                       24               Not later than 120 days after the date of enactment




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 of this Act, the Secretary shall provide to the Committee
                                                                       26 on Transportation and Infrastructure of the House of
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00157   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                              158
                                                                         1 Representatives and the Committee on Environment and
                                                                         2 Public Works of the Senate a report on plans to modify
                                                                         3 the Calcasieu River and Pass Dredged Material Manage-
                                                                         4 ment Plan and Supplemental Environmental Impact
                                                                         5 Statement (December 16, 2010 DMMP/SEIS) to allow for
                                                                         6 the expansion of Dredged Material Placement Facilities
                                                                         7 (DMPFs) 17, 19, 22, D, and E to the lakeside foreshore
                                                                         8 rock boundaries during planned rehabilitation of these fa-
                                                                         9 cilities.
                                                                       10      SEC. 326. SAN JUAN-CHAMA PROJECT; ABIQUIU DAM, NEW

                                                                       11                               MEXICO.

                                                                       12               (a) ABIQUIU RESERVOIR.—Section 5(b) of Public
                                                                       13 Law 97–140 (43 U.S.C. 620a note) is amended by strik-
                                                                       14 ing ‘‘a total of two hundred thousand acre-feet of’’.
                                                                       15               (b) WATER STORAGE AT ABIQUIU DAM, NEW MEX-
                                                                       16      ICO.—Section 1 of Public Law 100–522 (43 U.S.C. 620a

                                                                       17 note) is amended—
                                                                       18                         (1) by striking ‘‘200,000 acre-feet of’’;
                                                                       19                         (2)       by         inserting          ‘‘and         San         Juan-Chama
                                                                       20               project’’ after ‘‘Rio Grande system’’; and
                                                                       21                         (3) by striking ‘‘, in lieu of the water storage
                                                                       22               authorized by section 5 of Public Law 97–140, to
                                                                       23               the extent that contracting entities under section 5
                                                                       24               of Public Law 97–140 no longer require such stor-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               age’’.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00158    Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             159
                                                                         1              (c) WATER STORAGE.—The Secretary shall—
                                                                         2                        (1) store up to elevation 6230.00 NGVD29 at
                                                                         3              Abiquiu Dam, New Mexico, to the extent that the
                                                                         4              necessary real property interests have been acquired
                                                                         5              by any entity requesting such storage; and
                                                                         6                        (2) amend the March 20, 1986, contract be-
                                                                         7              tween the United States of America and the Albu-
                                                                         8              querque Bernalillo County Water Utility Authority
                                                                         9              (assigned by the City of Albuquerque, New Mexico
                                                                       10               to the Albuquerque Bernalillo County Water Utility
                                                                       11               Authority) for water storage space in Abiquiu Res-
                                                                       12               ervoir to allow for storage by the Albuquerque
                                                                       13               Bernalillo County Water Utility Authority of San
                                                                       14               Juan-Chama project water or native Rio Grande sys-
                                                                       15               tem water up to elevation 6230.00 NGVD29.
                                                                       16               (d) STORAGE AGREEMENTS WITH USERS OTHER
                                                                       17 THAN THE ALBUQUERQUE BERNALILLO COUNTY WATER
                                                                       18 UTILITY AUTHORITY.—The Secretary shall—
                                                                       19                         (1) retain or enter into new agreements with
                                                                       20               entities for a proportionate allocation of 29,100
                                                                       21               acre-feet of storage space pursuant to section 5 of
                                                                       22               Public Law 97–140; and
                                                                       23                         (2) amend or enter into new storage agree-
                                                                       24               ments for storage of San Juan-Chama project water



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               or native Rio Grande system water up to the space


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00159   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             160
                                                                         1              allocated for each entity’s proportionate share of
                                                                         2              San Juan-Chama water.
                                                                         3              (e) OPERATIONS DOCUMENTS.—The Secretary shall
                                                                         4 amend or revise any existing operations documents, in-
                                                                         5 cluding the Water Control Manual or operations plan for
                                                                         6 Abiquiu Reservoir, as necessary to meet the requirements
                                                                         7 of this section.
                                                                         8              (f) LIMITATIONS.—In carrying out this section, the
                                                                         9 following limitations shall apply:
                                                                       10                         (1) The storage of native Rio Grande system
                                                                       11               water shall be subject to the provisions of the Rio
                                                                       12               Grande Compact and the resolutions of the Rio
                                                                       13               Grande Compact Commission.
                                                                       14                         (2) The storage of native Rio Grande system
                                                                       15               water shall only be authorized to the extent that the
                                                                       16               necessary water ownership and storage rights have
                                                                       17               been acquired by the entity requesting such storage.
                                                                       18                         (3) The storage of native Rio Grande system
                                                                       19               water or San-Juan Chama project water shall not
                                                                       20               interfere with the authorized purposes of the
                                                                       21               Abiquiu Dam and Reservoir project.
                                                                       22                         (4) Each user of storage space, regardless of
                                                                       23               source of water, shall pay for any increase in costs
                                                                       24               attributable to storage of that user’s water.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00160   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             161
                                                                         1     SEC. 327. PAWCATUCK RIVER, LITTLE NARRAGANSETT BAY

                                                                         2                             AND WATCH HILL COVE, RHODE ISLAND AND

                                                                         3                             CONNECTICUT.

                                                                         4              Beginning on the date of enactment of this Act, that
                                                                         5 portion of the project for navigation, Pawcatuck River,
                                                                         6 Little Narragansett Bay and Watch Hill Cove, Rhode Is-
                                                                         7 land and Connecticut, authorized by section 2 of the Act
                                                                         8 of March 2, 1945 (chapter 19, 59 Stat. 13), consisting
                                                                         9 of a 10-foot deep, 16-acre anchorage area in Watch Hill
                                                                       10 Cove is no longer authorized.
                                                                       11      SEC. 328. HARRIS COUNTY, TEXAS.

                                                                       12               Section 575 of the Water Resources Development Act
                                                                       13 of 1996 (110 Stat. 3789) is repealed.
                                                                       14      SEC. 329. CAP SANTE WATERWAY, WASHINGTON.

                                                                       15               Beginning on the date of enactment of this Act, the
                                                                       16 project for navigation, Cap Sante Waterway and Naviga-
                                                                       17 tion Channel, Skagit County, Washington, authorized by
                                                                       18 the Act of March 2, 1919 (chapter 95, 40 Stat. 1285),
                                                                       19 is modified to deauthorize the portion of the project con-
                                                                       20 sisting of an approximately 334,434 foot area of the Fed-
                                                                       21 eral channel within Anacortes Harbor inside and directly
                                                                       22 adjacent to the Federal breakwater and training wall
                                                                       23 structure,                  starting            at       a      point         with         coordinates
                                                                       24 N557015.552,                        E1210819.619,                     thence         running      S88




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 13’2.06’’E approximately 200 feet to a point with coordi-
                                                                       26 nates N557009.330, E1211019.522, thence running S01
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00161   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             162
                                                                         1 46’58.08’’W approximately 578 feet to a point with co-
                                                                         2 ordinates N556431.405, E1211001.534, thence running
                                                                         3 S49 49’50.23’’W approximately 69 feet to a point with
                                                                         4 coordinates N556387.076, E1210949.002, thence running
                                                                         5 S51 53’0.25’’E approximately 35 feet to a point with co-
                                                                         6 ordinates N556365.662, E1210976.316, thence running
                                                                         7 S49 38’58.48’’W approximately 112 feet to a point with
                                                                         8 coordinates N556292.989, E1210890.775, thence running
                                                                         9 N88 13’1.87’’W approximately 109 feet to a point with
                                                                       10 coordinates N556296.367, E1210782.226, thence running
                                                                       11 S46 46’58.97’’W approximately 141 feet to a point with
                                                                       12 coordinates N556199.527, E1210679.164, thence running
                                                                       13 N88 13’1.77’’W approximately 700 feet to a point with
                                                                       14 coordinates N556221.305, E1209979.502, thence running
                                                                       15 N01 46’58.08’’E approximately 250 feet to a point with
                                                                       16 coordinates N556471.184, E1209987.280, thence running
                                                                       17 S88 13’1.77’’E approximately 815 feet to a point with co-
                                                                       18 ordinates N556445.828, E1210801.886, thence running
                                                                       19 N01 46’58.08’’E approximately 570 feet to the point of
                                                                       20 origin.
                                                                       21      SEC. 330. REGIONAL SEDIMENT MANAGEMENT.

                                                                       22               The Secretary shall expedite the activities required to
                                                                       23 be carried out under section 204 of the Water Resources
                                                                       24 Development Act of 1992 (33 U.S.C. 2326) regarding the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 use of improvement dredging of the Portsmouth Federal


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00162   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             163
                                                                         1 navigation project in Portsmouth, New Hampshire, as a
                                                                         2 source of clean beach fill material to reinforce the stone
                                                                         3 revetment at Nantasket Beach, Hull, Massachusetts.
                                                                         4     SEC.         331.      ADDITIONAL                  ASSISTANCE                FOR        CRITICAL

                                                                         5                              PROJECTS.

                                                                         6              (a) CONSISTENCY WITH REPORTS.—Congress finds
                                                                         7 that the project modifications described in this section are
                                                                         8 in accordance with the reports submitted to Congress by
                                                                         9 the Secretary under section 7001 of the Water Resources
                                                                       10 Reform and Development Act of 2014 (33 U.S.C. 2282d),
                                                                       11 titled ‘‘Report to Congress on Future Water Resources
                                                                       12 Development’’, or have otherwise been reviewed by Con-
                                                                       13 gress.
                                                                       14               (b) MODIFICATIONS.—
                                                                       15                         (1) SACRAMENTO AREA, CALIFORNIA.—Section
                                                                       16               219(f)(23) of the Water Resources Development Act
                                                                       17               of 1992 (106 Stat. 4835; 113 Stat. 336; 117 Stat.
                                                                       18               1840) is amended to read as follows:
                                                                       19                         ‘‘(23)        SACRAMENTO                     AREA,          CALIFORNIA.—

                                                                       20               $45,000,000 for regional water conservation, recy-
                                                                       21               cling, reliability, and resiliency projects in Placer, El
                                                                       22               Dorado, and Sacramento Counties and the San
                                                                       23               Juan Suburban Water District, California.’’.
                                                                       24                         (2)       SOUTH            PERRIS,             CALIFORNIA.—Section




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               219(f)(52) of the Water Resources Development Act


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00163   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             164
                                                                         1              of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.
                                                                         2              2763A–220) is amended by striking ‘‘$25,000,000’’
                                                                         3              and inserting ‘‘$50,000,000’’.
                                                                         4                        (3) MADISON AND ST. CLAIR COUNTIES, ILLI-
                                                                         5              NOIS.—Section                  219(f)(55) of the Water Resources
                                                                         6              Development Act of 1992 (106 Stat. 4835; 113
                                                                         7              Stat. 335; 114 Stat. 2763A–221) is amended by
                                                                         8              striking                 ‘‘$10,000,000’’                        and                inserting
                                                                         9              ‘‘$45,000,000’’.
                                                                       10                         (4) SOUTHERN                    AND EASTERN KENTUCKY.—

                                                                       11               Section 531 of the Water Resources Development
                                                                       12               Act of 1996 (110 Stat. 3773; 113 Stat. 348; 117
                                                                       13               Stat. 142; 121 Stat. 1226) is amended—
                                                                       14                                  (A) in subsection (g), by inserting ‘‘Boyd,
                                                                       15                         Carter, Elliott, Lincoln,’’ after ‘‘Lee,’’; and
                                                                       16                                  (B)         in     subsection              (h),         by       striking
                                                                       17                         ‘‘$40,000,000’’ and inserting ‘‘$80,000,000’’.
                                                                       18                         (5) DESOTO                  COUNTY,             MISSISSIPPI.—Section

                                                                       19               219(f)(30) of the Water Resources Development Act
                                                                       20               of 1992 (106 Stat. 4835; 113 Stat. 336; 114 Stat.
                                                                       21               2763A–220; 119 Stat. 282; 119 Stat. 2257; 122
                                                                       22               Stat. 1623) is amended by striking ‘‘$75,000,000’’
                                                                       23               and inserting ‘‘$130,000,000’’.
                                                                       24                         (6) JACKSON                 COUNTY,             MISSISSIPPI.—Section




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               219(e)(1) of the Water Resources Development Act


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00164   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             165
                                                                         1              of 1992 (106 Stat. 4835; 110 Stat. 3757; 113 Stat.
                                                                         2              1494; 121 Stat. 1258) is amended by striking
                                                                         3              ‘‘$32,500,000’’ and inserting ‘‘$57,500,000’’.
                                                                         4                        (7) ST. LOUIS, MISSOURI.—Section 219(f)(32)
                                                                         5              of the Water Resources Development Act of 1992
                                                                         6              (106 Stat. 4835; 113 Stat. 337; 121 Stat. 1233) is
                                                                         7              amended by striking ‘‘$35,000,000’’ and inserting
                                                                         8              ‘‘$70,000,000’’.
                                                                         9                        (8)        MIDWEST                CITY,          OKLAHOMA.—Section

                                                                       10               219(f)(231) of the Water Resources Development
                                                                       11               Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121
                                                                       12               Stat. 1266) is amended by striking ‘‘$2,000,000’’
                                                                       13               and inserting ‘‘$5,000,000’’.
                                                                       14                         (9) SOUTH CENTRAL PENNSYLVANIA.—Section
                                                                       15               313 of the Water Resources Development Act of
                                                                       16               1992 (106 Stat. 4845; 109 Stat. 407; 110 Stat.
                                                                       17               3723; 113 Stat. 310; 117 Stat. 142; 121 Stat.
                                                                       18               1146) is amended—
                                                                       19                                  (A) in subsection (g)(1), by striking
                                                                       20                         ‘‘$200,000,000’’ and inserting ‘‘$400,000,000’’;
                                                                       21                         and
                                                                       22                                  (B) in subsection (h)(2), by inserting
                                                                       23                         ‘‘Beaver, Jefferson,’’ after ‘‘Washington,’’.
                                                                       24                         (10) LAKES MARION AND MOULTRIE, SOUTH



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               CAROLINA.—Section                         219(f)(25) of the Water Re-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00165   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             166
                                                                         1              sources Development Act of 1992 (106 Stat. 4835;
                                                                         2              113 Stat. 336; 114 Stat. 2763A–220; 117 Stat.
                                                                         3              1838; 130 Stat. 1677; 132 Stat. 3818) is amended
                                                                         4              by          striking             ‘‘$89,550,000’’                   and             inserting
                                                                         5              ‘‘$110,000,000’’.
                                                                         6                        (11)        EL        PASO           COUNTY,             TEXAS.—Section

                                                                         7              219(f)(269) of the Water Resources Development
                                                                         8              Act of 1992 (106 Stat. 4835; 113 Stat. 336; 121
                                                                         9              Stat. 1268) is amended by striking ‘‘$25,000,000’’
                                                                       10               and inserting ‘‘$75,000,000’’.
                                                                       11                         (12) WESTERN RURAL WATER.—Section 595 of
                                                                       12               the Water Resources Development Act of 1999 (113
                                                                       13               Stat. 383; 117 Stat. 139; 117 Stat. 142; 117 Stat.
                                                                       14               1836; 118 Stat. 440; 121 Stat. 1219; 123 Stat.
                                                                       15               2851; 128 Stat. 1316; 130 Stat. 1681) is amend-
                                                                       16               ed—
                                                                       17                                  (A) by striking the section heading and in-
                                                                       18                         serting ‘‘WESTERN RURAL WATER.’’;
                                                                       19                                  (B) in subsection (b), by inserting ‘‘Ari-
                                                                       20                         zona,’’ before ‘‘rural Idaho’’;
                                                                       21                                  (C) in subsection (c), by inserting ‘‘Ari-
                                                                       22                         zona,’’ before ‘‘Idaho’’; and
                                                                       23                                  (D) in subsection (i), by striking ‘‘for the
                                                                       24                         period         beginning              with         fiscal        year       2001,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         $435,000,000, to remain available until ex-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00166   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             167
                                                                         1                        pended.’’ and inserting the following: ‘‘, to re-
                                                                         2                        main available until expended—
                                                                         3                        ‘‘(1) for the period beginning with fiscal year
                                                                         4              2001, $435,000,000 for Idaho, Montana, rural Ne-
                                                                         5              vada, New Mexico, rural Utah, and Wyoming; and
                                                                         6                        ‘‘(2) $150,000,000 for Arizona.’’.
                                                                         7                        (13) CENTRAL WEST VIRGINIA.—Section 571(h)
                                                                         8              of the Water Resources Development Act of 1999
                                                                         9              (113 Stat. 371; 121 Stat. 1257) is amended by
                                                                       10               striking                 ‘‘$20,000,000’’                        and                inserting
                                                                       11               ‘‘$40,000,000’’.
                                                                       12                         (14)        SOUTHERN                  WEST           VIRGINIA.—Section

                                                                       13               340(g) of the Water Resources Development Act of
                                                                       14               1992 (106 Stat. 4856; 110 Stat. 3727; 113 Stat.
                                                                       15               320) is amended by striking ‘‘$40,000,000’’ and in-
                                                                       16               serting ‘‘$120,000,000’’.
                                                                       17               (c) LOWELL CREEK TUNNEL, SEWARD, ALASKA.—
                                                                       18 Section 5032(a)(2) of the Water Resources Development
                                                                       19 Act of 2007 (Public Law 110–114, 121 Stat. 1205) is
                                                                       20 amended by striking ‘‘15’’ and inserting ‘‘20’’.
                                                                       21      SEC. 332. PROJECT MODIFICATION AUTHORIZATIONS.

                                                                       22               (a) WATER SUPPLY.—The following project modifica-
                                                                       23 tions for water supply, as identified in the report entitled
                                                                       24 ‘‘Report to Congress on Future Water Resources Develop-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 ment’’ dated February 2019, and submitted to Congress


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00167   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             168
                                                                         1 on June 3, 2019, pursuant to section 7001 of the Water
                                                                         2 Resources Reform and Development Act of 2014 (33
                                                                         3 U.S.C. 2282d) or otherwise reviewed by Congress, are au-
                                                                         4 thorized to be carried out by the Secretary substantially
                                                                         5 in accordance with the recommendations, included in such
                                                                         6 report pursuant to section 301(c) of the Water Supply Act
                                                                         7 of 1958 (43 U.S.C. 390b(c)):
                                                                         8                        (1) The project modification for the State of
                                                                         9              Missouri, Clarence Cannon Dam and Mark Twain
                                                                       10               Lake Project Salt River, Missouri.
                                                                       11                         (2) The project modification for the City of
                                                                       12               Plattsburg, Smithville Lake, Missouri.
                                                                       13                         (3) The project modification for the City of
                                                                       14               Smithville, Smithville Lake, Missouri.
                                                                       15               (b) FLOOD RISK MANAGEMENT.—The following
                                                                       16 project modifications for flood risk management, as identi-
                                                                       17 fied in a report entitled ‘‘Report to Congress on Future
                                                                       18 Water Resources Development’’, and submitted to Con-
                                                                       19 gress pursuant to section 7001 of the Water Resources
                                                                       20 Reform and Development Act of 2014 (33 U.S.C. 2282d)
                                                                       21 or otherwise reviewed by Congress, are authorized to be
                                                                       22 carried out by the Secretary:
                                                                       23                         (1) Modification of the project for flood risk
                                                                       24               management, lower Mississippi River, authorized by



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               the Act of May 15, 1928 (chapter 569, 45 Stat.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00168   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             169
                                                                         1              534), to incorporate the Wolf River Backwater and
                                                                         2              Nonconnah Creek levee systems into the project, au-
                                                                         3              thorized by section 5 of the Act of June 22, 1936
                                                                         4              (chapter 688, 49 Stat. 1575; 50 Stat. 881), subject
                                                                         5              to the determination of the Secretary that such sys-
                                                                         6              tems meet all requirements applicable to such
                                                                         7              project.
                                                                         8                        (2) Modification of the project for flood risk
                                                                         9              management, Red River below Denison Dam, Arkan-
                                                                       10               sas, Louisiana, and Texas, authorized by the Act of
                                                                       11               June 28, 1938 (chapter 795, 52 Stat. 1219), to in-
                                                                       12               corporate the Cherokee Park Levee into the project,
                                                                       13               subject to the determination of the Secretary that
                                                                       14               such levee meets all requirements applicable to such
                                                                       15               project.
                                                                       16      SEC. 333. APPLICATION OF CREDIT.

                                                                       17               Section 7007(d) of the Water Resources Development
                                                                       18 Act of 2007 (121 Stat. 1277; 128 Stat. 1226) is amended
                                                                       19 by inserting ‘‘, or may be applied to reduce the amounts
                                                                       20 required to be paid by the non-Federal interest under the
                                                                       21 terms of the deferred payment agreements entered into
                                                                       22 between the Secretary and the non-Federal interest for the
                                                                       23 projects authorized by section 7012(a)(1)’’ before the pe-
                                                                       24 riod at the end.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00169   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             170
                                                                         1     SEC. 334. PROJECT REAUTHORIZATIONS.

                                                                         2              (a) IN GENERAL.—
                                                                         3                        (1) MUDDY RIVER, MASSACHUSETTS.—The sep-
                                                                         4              arable elements for ecosystem restoration of the
                                                                         5              project for flood damage reduction and environ-
                                                                         6              mental restoration, Muddy River, Brookline and
                                                                         7              Boston, Massachusetts, authorized by section 522 of
                                                                         8              the Water Resources Development Act of 2000 (114
                                                                         9              Stat. 2656), and deauthorized pursuant to section
                                                                       10               6001 of the Water Resources Reform and Develop-
                                                                       11               ment Act of 2014 (128 Stat. 1345), are authorized
                                                                       12               to be carried out by the Secretary, subject to sub-
                                                                       13               section (b).
                                                                       14                         (2) EAST CHESTER CREEK, NEW YORK.—Not-
                                                                       15               withstanding section 1001 of the Water Resources
                                                                       16               Development Act of 1986 (33 U.S.C. 579a), the
                                                                       17               project for navigation, East Chester Creek, New
                                                                       18               York, authorized by section 101 of the River and
                                                                       19               Harbor Act of 1950 (64 Stat. 164; 100 Stat. 4181),
                                                                       20               and deauthorized pursuant to section 1001 of the
                                                                       21               Water Resources Development Act of 1986 (33
                                                                       22               U.S.C. 579(a)), is authorized to be carried out by
                                                                       23               the Secretary, subject to subsection (b).
                                                                       24                         (3) CHRISTIANSTED HARBOR, UNITED STATES




kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               VIRGIN ISLANDS.—Notwithstanding section 1002 of

                                                                       26               the Water Resources Development Act of 1986 (100
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00170   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             171
                                                                         1              Stat. 4221), the portion of the project for naviga-
                                                                         2              tion, Christiansted Harbor, St. Croix, United States
                                                                         3              Virgin Islands, authorized by section 101 of the
                                                                         4              River and Harbor Act of 1950 (64 Stat. 167), and
                                                                         5              deauthorized under section 1002 of the Water Re-
                                                                         6              sources Development Act of 1986 (100 Stat. 4221),
                                                                         7              is authorized to be carried out by the Secretary, sub-
                                                                         8              ject to subsection (b).
                                                                         9                        (4) CHARLOTTE HARBOR, UNITED STATES VIR-
                                                                       10               GIN ISLANDS.—Notwithstanding section 1002 of the

                                                                       11               Water Resources Development Act of 1986 (100
                                                                       12               Stat. 4221), the portion of the project for naviga-
                                                                       13               tion, Charlotte Amalie (St. Thomas) Harbor, St.
                                                                       14               Thomas, United States Virgin Islands, authorized by
                                                                       15               the Act of August 26, 1937 (chapter 832, 50 Stat.
                                                                       16               850), and deauthorized under section 1002 of the
                                                                       17               Water Resources Development Act of 1986 (100
                                                                       18               Stat. 4221), is authorized to be carried out by the
                                                                       19               Secretary, subject to subsection (b).
                                                                       20               (b) REPORT TO CONGRESS.—The Secretary shall
                                                                       21 complete and submit to the Committee on Transportation
                                                                       22 and Infrastructure of the House of Representatives and
                                                                       23 the Committee on Environment and Public Works of the
                                                                       24 Senate a post-authorization change report (as such term



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 is defined in section 1132(d) of the Water Resources De-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00171   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             172
                                                                         1 velopment Act of 2016 (33 U.S.C. 2282e(d)) prior to car-
                                                                         2 rying out a project identified in subsection (a).
                                                                         3     SEC. 335. CONVEYANCES.

                                                                         4              (a) GENERALLY APPLICABLE PROVISIONS.—
                                                                         5                        (1) SURVEY TO OBTAIN LEGAL DESCRIPTION.—
                                                                         6              The exact acreage and the legal description of any
                                                                         7              real property to be conveyed under this section shall
                                                                         8              be determined by a survey that is satisfactory to the
                                                                         9              Secretary.
                                                                       10                         (2) APPLICABILITY OF PROPERTY SCREENING
                                                                       11               PROVISIONS.—Section                          2696 of title 10, United
                                                                       12               States Code, shall not apply to any conveyance
                                                                       13               under this section.
                                                                       14                         (3) COSTS              OF       CONVEYANCE.—An                       entity to
                                                                       15               which a conveyance is made under this section shall
                                                                       16               be responsible for all reasonable and necessary costs,
                                                                       17               including real estate transaction and environmental
                                                                       18               documentation costs, associated with the conveyance.
                                                                       19                         (4) LIABILITY.—An entity to which a convey-
                                                                       20               ance is made under this section shall hold the
                                                                       21               United States harmless from any liability with re-
                                                                       22               spect to activities carried out, on or after the date
                                                                       23               of the conveyance, on the real property conveyed.
                                                                       24               The United States shall remain responsible for any



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00172   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             173
                                                                         1              liability with respect to activities carried out, before
                                                                         2              such date, on the real property conveyed.
                                                                         3                        (5) ADDITIONAL TERMS AND CONDITIONS.—
                                                                         4              The Secretary may require that any conveyance
                                                                         5              under this section be subject to such additional
                                                                         6              terms and conditions as the Secretary considers nec-
                                                                         7              essary and appropriate to protect the interests of the
                                                                         8              United States.
                                                                         9              (b) EUFAULA, ALABAMA.—
                                                                       10                         (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       11               shall convey to the City of Eufaula, Alabama, all
                                                                       12               right, title, and interest of the United States in and
                                                                       13               to the real property described in the Department of
                                                                       14               the Army Lease No. DACW01–2–17–0747, con-
                                                                       15               taining 56.76 acres, more or less, and being a part
                                                                       16               of Tracts L–1268 (26.12 acres), L–1273 (13.71
                                                                       17               acres), L–1278 (6.75 acres), and L1279 (10.36
                                                                       18               acres) of the Walter F. George Lock and Dam and
                                                                       19               Lake project.
                                                                       20                         (2) DEED.—The Secretary shall convey the
                                                                       21               property under this subsection by quitclaim deed
                                                                       22               under such terms and conditions as the Secretary
                                                                       23               determines appropriate to protect the interests of
                                                                       24               the United States.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00173   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             174
                                                                         1                        (3) CONSIDERATION.—The City of Eufaula,
                                                                         2              Alabama, shall pay to the Secretary an amount that
                                                                         3              is not less than the fair market value of the property
                                                                         4              conveyed under this subsection, as determined by the
                                                                         5              Secretary.
                                                                         6              (c) MONTGOMERY, ALABAMA.—
                                                                         7                        (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                         8              shall convey to the City of Montgomery, Alabama,
                                                                         9              all right, title, and interest of the United States in
                                                                       10               and to the real property described in paragraph (2).
                                                                       11                         (2) PROPERTY.—The property to be conveyed is
                                                                       12               the 62.38 acres of land and water under the primary
                                                                       13               jurisdiction of the Secretary in the R.E. ‘‘Bob’’
                                                                       14               Woodruff Project Area that is covered by lease num-
                                                                       15               ber DACW01–1–05–0037, including the parcels and
                                                                       16               structure known as ‘‘Powder Magazine’’.
                                                                       17                         (3) DEED.—The Secretary shall convey the
                                                                       18               property under this subsection by quitclaim deed
                                                                       19               under such terms and conditions as the Secretary
                                                                       20               determines appropriate to protect the interests of
                                                                       21               the United States, to include retaining the right to
                                                                       22               inundate with water any land transferred under this
                                                                       23               subsection.
                                                                       24                         (4)       CONSIDERATION.—The                            City        of   Mont-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               gomery, Alabama, shall pay to the Secretary an


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00174   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             175
                                                                         1              amount that is not less than the fair market value
                                                                         2              of the property conveyed under this subsection, as
                                                                         3              determined by the Secretary.
                                                                         4              (d) OHIO RIVER LOCK                               AND        DAM NUMBER 52,
                                                                         5 MASSAC COUNTY, ILLINOIS.—
                                                                         6                        (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                         7              shall convey to the Massac-Metropolis Port District,
                                                                         8              Illinois, all right, title, and interest of the United
                                                                         9              States in and to any real property located north of
                                                                       10               the south bank of the Ohio River in Massac County,
                                                                       11               Illinois, that is associated with the Ohio River Lock
                                                                       12               and Dam 52.
                                                                       13                         (2) DEED.—The Secretary shall convey the
                                                                       14               property under this subsection by quitclaim deed
                                                                       15               under such terms and conditions as the Secretary
                                                                       16               determines appropriate to protect the interests of
                                                                       17               the United States.
                                                                       18                         (3) CONSIDERATION.—The Massac-Metropolis
                                                                       19               Port District, Illinois, shall pay to the Secretary an
                                                                       20               amount that is not less than fair market value of the
                                                                       21               property conveyed under this subsection, as deter-
                                                                       22               mined by the Secretary.
                                                                       23               (e) CLINTON, MISSOURI.—
                                                                       24                         (1) CONVEYANCE AUTHORIZED.—The Secretary



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               shall convey to the City of Clinton, Missouri, without


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00175   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             176
                                                                         1              consideration, all right, title, and interest of the
                                                                         2              United States in and to the real property described
                                                                         3              in paragraph (2).
                                                                         4                        (4) PROPERTY.—The property to be conveyed is
                                                                         5              a tract of land situated in the S 1⁄2 of Section 12
                                                                         6              and the N 1⁄2 of Section 13, Township 41 North,
                                                                         7              Range 26 West of the Fifth Principal Meridian,
                                                                         8              Henry County, Missouri, more particularly described
                                                                         9              as follows: Beginning at the point of intersection of
                                                                       10               the north line of said S 1⁄2 of Section 12 and the
                                                                       11               easterly right-of-way of State Highway No. 13;
                                                                       12               thence easterly along the north line of said S 1⁄2 to
                                                                       13               the northeast corner of the W 1⁄2 NW 1⁄4 NE 1⁄4 SW
                                                                       14               14⁄ of said Section 12; thence southerly along the
                                                                       15               east line of said W 1⁄2 NW 1⁄4 NE 1⁄4 SW 1⁄4 to the
                                                                       16               southeast corner thereof; thence easterly along the
                                                                       17               north line of the S 1⁄2 NE 1⁄4 SW 1⁄4 of said Section
                                                                       18               12 to the southwest corner of the W 1⁄2 NW 1⁄4 NW
                                                                       19               14⁄ SE 1⁄4 of said Section 12; thence in a northeast-
                                                                       20               erly direction to the northeast corner of said W 1⁄2
                                                                       21               NW 1⁄4 NW 1⁄4 SE 1⁄4 ; thence easterly along the
                                                                       22               north line of said S 1⁄2 to the westerly right-of-way
                                                                       23               of the County Road; thence in a southeasterly and
                                                                       24               southerly direction along the westerly right-of-way of



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               said County Road approximately 2500 feet to the


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00176   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             177
                                                                         1              center of Deer Creek; thence in a southwesterly di-
                                                                         2              rection along the center of said Deer Creek, approxi-
                                                                         3              mately 3900 feet to the south line of said N 1⁄2 of
                                                                         4              Section 13; thence westerly along the south line of
                                                                         5              said N 1⁄2 to the easterly right-of-way line of the St.
                                                                         6              Louis-San Francisco Railroad; thence in a north-
                                                                         7              westerly direction along the easterly right-of-way of
                                                                         8              said railroad to the easterly right-of-way of said
                                                                         9              State Highway No. 13; thence in a northeasterly di-
                                                                       10               rection along the easterly right-of-way of said State
                                                                       11               Highway No. 13 to the point of the beginning; and
                                                                       12               including a roadway easement for ingress and
                                                                       13               egress, described as a strip of land 80 feet in width,
                                                                       14               lying 40 feet on each side of the following described
                                                                       15               line, the initial extremities of the following described
                                                                       16               strip being extended or reduced as required to ex-
                                                                       17               actly adjoin the boundary lines which they meet, sit-
                                                                       18               uated in the S 1⁄2 of Section 12, Township 41 North
                                                                       19               Range 26 West of the Fifth Principal Meridian,
                                                                       20               Henry County, Missouri, more particularly described
                                                                       21               as follows: Commencing at the center of said Section
                                                                       22               12, thence Sl°24’56’’W, 1265.52 feet to a point,
                                                                       23               thence N88°29’02’’W, 483.97 feet to the point of
                                                                       24               beginning of the strip of land herein described;



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               thence in a northeasterly direction along a curve to


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00177   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             178
                                                                         1              the right, said curve having an initial tangent bear-
                                                                         2              ing of N3°44’4l’’E, a radius of 238.73 feet and an
                                                                         3              interior angle of 61°29’26’’, an arc distance of
                                                                         4              256.21 feet to a point; thence N65°14’07’’E 218.58
                                                                         5              feet to a point; thence in a northeasterly direction
                                                                         6              along a curve to the left, having a radius of 674.07
                                                                         7              feet and an interior angle of 36°00’01’’, an arc dis-
                                                                         8              tance          of       423.53            feet         to      a      point;       thence
                                                                         9              N29°14’07’’E, 417.87 feet to a point; thence north-
                                                                       10               easterly along a curve to the right, having a radius
                                                                       11               of 818.51 feet and an interior angle of 14°30’01’’,
                                                                       12               an arc distance of 207.15 feet to a point; thence
                                                                       13               N43°44’07’’E, 57.00 feet to the southerly right-of-
                                                                       14               way line of a county road, containing 2,948 acres,
                                                                       15               more or less; Excluding therefrom a tract of land
                                                                       16               situated in the S 1⁄2 of said Section 12, said Town-
                                                                       17               ship and Range, described as commencing at the
                                                                       18               center of said Section 12; thence S1°24’56’’W,
                                                                       19               1265.52 feet to the point of beginning of the tract
                                                                       20               of land herein described; thence N88°29’02″W,
                                                                       21               1122.50 feet; thence S1°43’26″W, 872.62 feet;
                                                                       22               thence             S88°29’02’’E,                      1337.36          feet;       thence
                                                                       23               Nl°43’26’’E, 872.62 feet; thence N88°29’02’’W,
                                                                       24               214.86 feet to the point of beginning, containing



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               26.79 acres, more or less. The above described tract


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00178   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             179
                                                                         1              contains, in the aggregate, 177.69 acres, more or
                                                                         2              less.
                                                                         3                        (2) DEED.—The Secretary shall convey the
                                                                         4              property under this subsection by quitclaim deed
                                                                         5              under such terms and conditions as the Secretary
                                                                         6              determines appropriate to protect the interests of
                                                                         7              the United States.
                                                                         8                        (3) REVERSION.—If the Secretary determines
                                                                         9              that the property conveyed under this subsection is
                                                                       10               not being used for a public purpose, all right, title,
                                                                       11               and interest in and to the property shall revert, at
                                                                       12               the discretion of the Secretary, to the United States.
                                                                       13               (f) CITY OF CLINTON, OLD ORCHARD ADDITION,
                                                                       14 MISSOURI.—
                                                                       15                         (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       16               shall convey to the City of Clinton, Missouri, all
                                                                       17               right, title, and interest of the United States in and
                                                                       18               to the real property described in paragraph (2).
                                                                       19                         (2) PROPERTY.—The property to be conveyed is
                                                                       20               Lot 28 in Old Orchard Addition, a subdivision of the
                                                                       21               City of Clinton, Henry County, Missouri, containing
                                                                       22               0.36 acres, more or less, including any improve-
                                                                       23               ments thereon.
                                                                       24                         (3) DEED.—The Secretary shall convey the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               property under this subsection by quitclaim deed


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00179   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             180
                                                                         1              under such terms and conditions as the Secretary
                                                                         2              determines appropriate to protect the interests of
                                                                         3              the United States, including such reservations,
                                                                         4              terms, and conditions as the Secretary determines
                                                                         5              necessary to allow the United States to operate and
                                                                         6              maintain the Harry S. Truman Reservoir Project.
                                                                         7                        (4) CONSIDERATION.—The City of Clinton,
                                                                         8              Missouri, shall pay to the Secretary an amount that
                                                                         9              is not less than the fair market value of the property
                                                                       10               conveyed under this subsection, as determined by the
                                                                       11               Secretary.
                                                                       12               (g) TRI-COUNTY LEVEE DISTRICT, MISSOURI.—
                                                                       13                         (1) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       14               shall convey to the Tri-County Levee District, Mis-
                                                                       15               souri, all right, title, and interest of the United
                                                                       16               States in and to the real property described in para-
                                                                       17               graph (2).
                                                                       18                         (2) PROPERTY.—The property to be conveyed is
                                                                       19               the part of Sections 1 and 12 Township 45 North
                                                                       20               Range 6 West of the 5th P.M. in Montgomery Coun-
                                                                       21               ty, Missouri, described as follows: A tract of land
                                                                       22               being 60’ wide and lying South and East of and ad-
                                                                       23               joining the centerline of the existing levee and being
                                                                       24               described as follows: Commencing at the NW corner



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               of Section 12, thence S 87° 52’ 35’’ E 587.4’,


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00180   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             181
                                                                         1              thence S 01° 29’ 25’’ W 453.68’ to the point of the
                                                                         2              beginning; said point being in the center of the levee,
                                                                         3              thence with the centerline of the levee N 77° 01’ 30’’
                                                                         4              E 164.92’, thence N 74° 26’ 55’’ E 250.0’, thence
                                                                         5              N 72° 27’ 55’’ E 270.0’, thence N 69° 06’ 10’’ E
                                                                         6              300.0’, thence N 66° 42’ 15’’ E 500.0’, thence N
                                                                         7              64° 14’ 30’’ E 270.0’, thence N 61° 09’ 10’’ E
                                                                         8              800.0’, thence N 60° 58’ 15’’ E 1724.45’, thence
                                                                         9              leaving the centerline S 01° 10’ 35’’ W 69.43’,
                                                                       10               thence parallel with the above described centerline S
                                                                       11               60° 58’ 15’’ W 1689.62’, thence S 61° 09’ 10’’ W
                                                                       12               801.71’, thence S 64° 14’ 30’’ W 272.91’, thence S
                                                                       13               66° 42’ 15’’ W 502.55’, thence S 69° 06’ 10’’ W
                                                                       14               303.02’, thence S 72° 27’ 55’’ W 272.8’, thence S
                                                                       15               74° 26’ 55’’ W 252.39’, thence S 77° 01’ 30’’ W
                                                                       16               181.75’, thence leaving the South side of the levee
                                                                       17               N 01° 26’ 25’’ E 61.96’ to the point of beginning
                                                                       18               and containing 5.89 acres more or less.
                                                                       19                         (3) DEED.—The Secretary shall convey the
                                                                       20               property under this subsection by quitclaim deed
                                                                       21               under such terms and conditions as the Secretary
                                                                       22               determines appropriate to protect the interests of
                                                                       23               the United States.
                                                                       24                         (4) CONSIDERATION.—The Tri-County Levee



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               District, Missouri, shall pay to the Secretary an


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00181   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             182
                                                                         1              amount that is not less than the fair market value
                                                                         2              of the property conveyed under this subsection, as
                                                                         3              determined by the Secretary.
                                                                         4              (h) JUDGE JOSEPH BARKER, JR., HOUSE, OHIO.—
                                                                         5                        (1) NON-FEDERAL ENTITY.—In this subsection,
                                                                         6              the term ‘‘non-Federal entity’’ means the Friends of
                                                                         7              Joseph Barker, Jr., House, a nonprofit organization
                                                                         8              in the State of Ohio.
                                                                         9                        (2) CONVEYANCE AUTHORIZED.—
                                                                       10                                  (A) IN GENERAL.—Subject to paragraph
                                                                       11                         (6), the Secretary shall convey to the non-Fed-
                                                                       12                         eral entity, without consideration, all right,
                                                                       13                         title, and interest of the United States in and
                                                                       14                         to the property described in paragraph (3)(A).
                                                                       15                                  (B) EASEMENT.—Upon conveyance of the
                                                                       16                         property under subparagraph (A), the Secretary
                                                                       17                         shall provide to the non-Federal entity, without
                                                                       18                         consideration, an easement over the property
                                                                       19                         described in paragraph (3)(B) for access to the
                                                                       20                         conveyed property for as long as the non-Fed-
                                                                       21                         eral entity is in legal possession of the conveyed
                                                                       22                         property.
                                                                       23                         (3) DESCRIPTIONS OF PROPERTY.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00182   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             183
                                                                         1                                 (A) IN GENERAL.—The property referred
                                                                         2                        to in paragraph (2)(A) is the following (as in
                                                                         3                        existence on the date of enactment of this Act):
                                                                         4                                         (i) JUDGE                  JOSEPH          BARKER,      JR.,

                                                                         5                                 HOUSE.—The tract of land situated in the

                                                                         6                                 State of Ohio, Washington County, on the
                                                                         7                                 Ohio River, and being particularly bounded
                                                                         8                                 and described as follows: Beginning at a
                                                                         9                                 point located on the southern right-of-way
                                                                       10                                  line of Ohio Route 7, a new corner to the
                                                                       11                                  land now or formerly owned by the United
                                                                       12                                  States of America; thence, leaving the
                                                                       13                                  right-of-way of said Route 7 and severing
                                                                       14                                  the land of said United States of America
                                                                       15                                  parallel to and approximately 10 feet eas-
                                                                       16                                  terly of the toe of the existing dredge dis-
                                                                       17                                  posal berm, southeasterly approximately
                                                                       18                                  326 feet to a point prior to the current
                                                                       19                                  Corps of Engineers access to the dredging
                                                                       20                                  spoil area; thence, northeasterly approxi-
                                                                       21                                  mately 480 feet paralleling the top of the
                                                                       22                                  slope to the riverbank side of the house
                                                                       23                                  and approximately 25 feet northerly there-
                                                                       24                                  from; thence, northwest approximately 302



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  feet to a point in the southern right-of-way


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00183   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             184
                                                                         1                                 of Ohio Route 7; thence with the right-of-
                                                                         2                                 way of said Route 7, southwesterly ap-
                                                                         3                                 proximately 485 feet to the point of begin-
                                                                         4                                 ning, containing approximately 3.51 acres.
                                                                         5                                         (ii) ROAD TRACT.—The tract of land
                                                                         6                                 situated in the State of Ohio, Washington
                                                                         7                                 County, on the Ohio River, and being par-
                                                                         8                                 ticularly bounded and described as follows:
                                                                         9                                 Beginning at a point located on the south-
                                                                       10                                  ern right-of-way line of Ohio Route 7, a
                                                                       11                                  new corner to the land now or formerly
                                                                       12                                  owned by the United States of America;
                                                                       13                                  thence, leaving the right-of-way of said
                                                                       14                                  Route 7 and severing the land of said
                                                                       15                                  United States of America and with the
                                                                       16                                  House Parcel southeasterly 25 feet; thence,
                                                                       17                                  northeast, running parallel to said Route 7
                                                                       18                                  right-of-way, approximately 994 feet to a
                                                                       19                                  point of deflection; thence northeasterly
                                                                       20                                  368 feet to a point beyond the existing
                                                                       21                                  fence corner; thence, east 140 feet to the
                                                                       22                                  edge of the existing Willow Island access
                                                                       23                                  road; thence with said access road, north-
                                                                       24                                  westerly approximately 62 feet to a point



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                  in the southern right-of-way of Ohio Route


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00184   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                               185
                                                                         1                                 7; thence with the right-of-way of said
                                                                         2                                 Route          7,       southwesterly               approximately
                                                                         3                                 1,491 feet to the point of beginning, con-
                                                                         4                                 taining approximately 1 acre.
                                                                         5                                 (B) EASEMENT.—The property referred to
                                                                         6                        in paragraph (2)(B) is the following: The tract
                                                                         7                        of land situated in the State of Ohio, Wash-
                                                                         8                        ington County, on the Ohio River, and being
                                                                         9                        particularly bounded and described as follows:
                                                                       10                         Beginning at a point at the intersection of the
                                                                       11                         southern right-of-way of Ohio Route 7 and the
                                                                       12                         northeast side of the existing Willow Island ac-
                                                                       13                         cess road, a new corner to the land now or for-
                                                                       14                         merly owned by the United States of America;
                                                                       15                         thence, southwest, running with said Route 7
                                                                       16                         right-of-way, approximately 30 feet to a point
                                                                       17                         on the southwest side of the existing access
                                                                       18                         road, and corner to the road tract; thence with
                                                                       19                         said access road and the line of the road parcel,
                                                                       20                         southeasterly approximately 62 feet to a point;
                                                                       21                         thence leaving the road parcel and crossing the
                                                                       22                         existing access road northeasterly approxi-
                                                                       23                         mately 30 feet to a point located on the north-
                                                                       24                         east side of the existing access road; thence,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         northwesterly approximately 62 feet, to the


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00185   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             186
                                                                         1                        point of beginning, containing approximately
                                                                         2                        0.04 acre.
                                                                         3                        (4) DEED.—The Secretary shall convey the
                                                                         4              property under this subsection by quitclaim deed
                                                                         5              under such terms and conditions as the Secretary
                                                                         6              determines appropriate to protect the interests of
                                                                         7              the United States.
                                                                         8                        (5) REVERSION.—If the Secretary determines
                                                                         9              that the property conveyed under this subsection is
                                                                       10               not being used by the non-Federal entity for a public
                                                                       11               purpose, all right, title, and interest in and to the
                                                                       12               property shall revert, at the discretion of the Sec-
                                                                       13               retary, to the United States.
                                                                       14                         (6) REQUIREMENTS.—
                                                                       15                                  (A) IMPROVEMENTS.—The Secretary shall
                                                                       16                         make such improvements and alterations to the
                                                                       17                         property described in paragraph (3)(A)(i) as
                                                                       18                         the Secretary, in consultation with the non-Fed-
                                                                       19                         eral entity and relevant stakeholders, deter-
                                                                       20                         mines to be appropriate to facilitate conveyance
                                                                       21                         of the property and provision of the easement
                                                                       22                         under this subsection, subject to the condition
                                                                       23                         that the total cost of those improvements and
                                                                       24                         alterations undertaken by the Secretary shall be



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         not more than $120,000.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00186   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             187
                                                                         1                                 (B) ENVIRONMENTAL ASSESSMENT.—Be-
                                                                         2                        fore making a conveyance under paragraph (2),
                                                                         3                        the Secretary shall—
                                                                         4                                         (i) conduct, with respect to the prop-
                                                                         5                                 erty to be conveyed, an assessment of the
                                                                         6                                 environmental condition of the property,
                                                                         7                                 including an investigation of any potential
                                                                         8                                 hazardous, toxic, or radioactive waste
                                                                         9                                 present on such property; and
                                                                       10                                          (ii) submit to the non-Federal entity a
                                                                       11                                  report describing the results of such as-
                                                                       12                                  sessment.
                                                                       13                                  (C) REFUSAL BY NON-FEDERAL ENTITY.—
                                                                       14                                          (i) IN GENERAL.—Upon review by the
                                                                       15                                  non-Federal entity of the report under sub-
                                                                       16                                  paragraph (B), the non-Federal entity may
                                                                       17                                  elect to refuse the conveyance under this
                                                                       18                                  subsection.
                                                                       19                                          (ii) ELECTION.—An election under
                                                                       20                                  clause (i)—
                                                                       21                                                   (I) shall be at the sole discretion
                                                                       22                                          of the non-Federal entity; and
                                                                       23                                                   (II) shall be made by the non-
                                                                       24                                          Federal entity by not later than the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                                          date that is 30 days after the date of


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00187   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             188
                                                                         1                                         submission of the report under sub-
                                                                         2                                         paragraph (B)(ii).
                                                                         3                                 (D) DREDGED MATERIAL PLACEMENT AC-
                                                                         4                        TIVITIES.—The Secretary shall—

                                                                         5                                         (i) notify and coordinate with the non-
                                                                         6                                 Federal entity and relevant stakeholders
                                                                         7                                 before carrying out any dredged material
                                                                         8                                 placement activities associated with the
                                                                         9                                 property described in paragraph (3)(A)
                                                                       10                                  after the date on which such property is
                                                                       11                                  conveyed under this subsection; and
                                                                       12                                          (ii) in carrying out a dredged material
                                                                       13                                  placement activity under clause (i), act in
                                                                       14                                  accordance with Engineer Manual EM
                                                                       15                                  1110–2–5025 (or a subsequent version of
                                                                       16                                  that manual).
                                                                       17                         (7) RESERVATION OF RIGHTS.—The Secretary
                                                                       18               may reserve and retain from any conveyance under
                                                                       19               this subsection a right-of-way or any other right that
                                                                       20               the Secretary determines to be necessary for the op-
                                                                       21               eration and maintenance of the authorized Federal
                                                                       22               channel along the Ohio River.
                                                                       23                         (8) TREATMENT.—Conveyance to the non-Fed-
                                                                       24               eral entity under this subsection of property de-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               scribed in paragraph (3)(A)(i) shall satisfy all obli-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00188   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             189
                                                                         1              gations of the Secretary with respect to such prop-
                                                                         2              erty under—
                                                                         3                                 (A) section 306101 of title 54, United
                                                                         4                        States Code; and
                                                                         5                                 (B) section 306108 of title 54, United
                                                                         6                        States Code, with respect to the effects on the
                                                                         7                        property of dredged material placement activi-
                                                                         8                        ties carried out by the Secretary after the date
                                                                         9                        of the conveyances.
                                                                       10                         (9) INAPPLICABILITY.—Subtitle I of title 40,
                                                                       11               and chapter 4 of title 41, United States Code shall
                                                                       12               not apply to any conveyance or easement provided
                                                                       13               under this subsection.
                                                                       14               (i) LEABURG FISH HATCHERY, LANE COUNTY, OR-
                                                                       15      EGON.—

                                                                       16                         (1) CONVEYANCE AUTHORIZED.—Subject to the
                                                                       17               provisions of this subsection, the Secretary shall con-
                                                                       18               vey, without consideration, to the State of Oregon,
                                                                       19               acting through the Oregon Department of Fish and
                                                                       20               Wildlife, all right, title, and interest of the United
                                                                       21               States in and to the real property comprising the
                                                                       22               Leaburg Fish Hatchery, consisting of approximately
                                                                       23               21.55 acres, identified as tracts Q–1500, Q–1501E,
                                                                       24               and 300E–1 and described in Department of the



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00189   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             190
                                                                         1              Army Lease No. DACW57–1–18–0009, together
                                                                         2              with any improvements on the property.
                                                                         3                        (2) WATER RIGHTS.—The Secretary may trans-
                                                                         4              fer to the State of Oregon, acting through the Or-
                                                                         5              egon Department of Fish and Wildlife, any water
                                                                         6              rights held by the United States that are appur-
                                                                         7              tenant to the property conveyed under this sub-
                                                                         8              section.
                                                                         9                        (3) DEED.—The Secretary shall convey the
                                                                       10               property under this subsection by quitclaim deed
                                                                       11               under such terms and conditions as the Secretary
                                                                       12               determines appropriate to protect the interests of
                                                                       13               the United States, including a condition that all of
                                                                       14               the property conveyed under this subsection be used
                                                                       15               and maintained by the State of Oregon for the pur-
                                                                       16               pose of operating a fish hatchery in perpetuity.
                                                                       17                         (4) REVERSION.—If the Secretary determines
                                                                       18               that the property conveyed under this subsection is
                                                                       19               not being used or maintained by the State of Oregon
                                                                       20               for the purpose of operating a fish hatchery in per-
                                                                       21               petuity, all or any portion of the property, including
                                                                       22               any water rights transferred under this subsection,
                                                                       23               shall, at the option of the Secretary, revert to the
                                                                       24               United States.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00190   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             191
                                                                         1                        (5) SAVINGS CLAUSE.—If the State of Oregon
                                                                         2              does not accept the conveyance under this sub-
                                                                         3              section, the Secretary may dispose of the property,
                                                                         4              including appurtenant water rights, under sub-
                                                                         5              chapter III of chapter 5 of title 40, United States
                                                                         6              Code.
                                                                         7              (j)       WILLAMETTE                  FALLS             LOCKS,             WILLAMETTE
                                                                         8 RIVER, OREGON.—
                                                                         9                        (1) DEFINITIONS.—In this section:
                                                                       10                                  (A) REAL ESTATE APPENDIX.—The term
                                                                       11                         ‘‘real estate appendix’’ means Appendix A of
                                                                       12                         the document published by the District Com-
                                                                       13                         mander of the Portland District of the Corps of
                                                                       14                         Engineers, titled ‘‘Willamette Falls Locks Wil-
                                                                       15                         lamette River Oregon Section 216 Disposition
                                                                       16                         Study with Integrated Environmental Assess-
                                                                       17                         ment’’.
                                                                       18                                  (B) RECEIVING ENTITY.—The term ‘‘re-
                                                                       19                         ceiving entity’’ means an entity identified by the
                                                                       20                         State of Oregon, in consultation with the Wil-
                                                                       21                         lamette Falls Locks Commission, to receive the
                                                                       22                         conveyance under paragraph (2).
                                                                       23                                  (C)           WILLAMETTE                       FALLS            LOCKS

                                                                       24                         PROJECT.—The                    term ‘‘Willamette Falls Locks



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         project’’ means the project for navigation, Wil-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00191   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             192
                                                                         1                        lamette Falls Locks, Willamette River, Oregon,
                                                                         2                        authorized by the Act of June 25, 1910 (36
                                                                         3                        Stat. 664, chapter 382).
                                                                         4                                 (D)         WILLAMETTE                  FALLS           LOCKS    RE-

                                                                         5                        PORT.—The term ‘‘Willamette Falls Locks re-

                                                                         6                        port’’ means the memorandum of the Director
                                                                         7                        of Civil Works with the subject ‘‘Willamette
                                                                         8                        Falls Locks (WFL), Willamette River Oregon
                                                                         9                        Section 216 Disposition Study with Integrated
                                                                       10                         Environmental                   Assessment              (Study)’’,       dated
                                                                       11                         July 11, 2019.
                                                                       12                         (2) CONVEYANCE AUTHORIZED.—The Secretary
                                                                       13               is authorized to convey to the receiving entity, with-
                                                                       14               out consideration, all right, title, and interest of the
                                                                       15               United States in and to any land in which the Fed-
                                                                       16               eral Government has a property interest for the Wil-
                                                                       17               lamette Falls Locks project, together with any im-
                                                                       18               provements on the land, subject to the requirements
                                                                       19               of this subsection and in accordance with the Wil-
                                                                       20               lamette Falls Locks report.
                                                                       21                         (3) DEED.—The Secretary shall convey the
                                                                       22               property under this subsection by quitclaim deed
                                                                       23               under such terms and conditions as the Secretary
                                                                       24               determines appropriate to protect the interests of



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               the United States.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00192   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             193
                                                                         1                        (4) SUBJECT TO EXISTING EASEMENTS AND
                                                                         2              OTHER INTERESTS.—The                                  conveyance of property
                                                                         3              under paragraph (2) shall be subject to all existing
                                                                         4              deed reservations, easements, rights-of-way, and
                                                                         5              leases that are in effect as of the date of the convey-
                                                                         6              ance.
                                                                         7                        (5) REVERSION.—If the Secretary determines
                                                                         8              that the property conveyed under this subsection
                                                                         9              cease to be held in public ownership, all right, title,
                                                                       10               and interest in and to the property shall revert, at
                                                                       11               the discretion of the Secretary, to the United States.
                                                                       12                         (6) REQUIREMENTS BEFORE CONVEYANCE.—
                                                                       13                                  (A) PERPETUAL                      ROAD EASEMENT.—Be-

                                                                       14                         fore making the conveyance under paragraph
                                                                       15                         (2), the Secretary shall acquire a perpetual
                                                                       16                         road easement from an adjacent property owner
                                                                       17                         for use of an access road, which easement shall
                                                                       18                         convey with the property conveyed under such
                                                                       19                         paragraph.
                                                                       20                                  (B) ENVIRONMENTAL COMPLIANCE.—Be-
                                                                       21                         fore making the conveyance under paragraph
                                                                       22                         (2), in accordance with the real estate appendix,
                                                                       23                         the Secretary shall complete a Phase 1 Envi-
                                                                       24                         ronmental Site Assessment pursuant to the



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25                         Comprehensive Environmental Response, Com-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00193   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             194
                                                                         1                        pensation, and Liability Act of 1980 (42 U.S.C.
                                                                         2                        9601 et seq.).
                                                                         3                                 (C) HISTORIC PRESERVATION.—The Sec-
                                                                         4                        retary may enter into a memorandum of agree-
                                                                         5                        ment with the Oregon State Historic Preserva-
                                                                         6                        tion Office and the Advisory Council on His-
                                                                         7                        toric Preservation that identifies actions the
                                                                         8                        Secretary shall take before making the convey-
                                                                         9                        ance under paragraph (2).
                                                                       10                                  (D) REPAIRS.—Before making the convey-
                                                                       11                         ance under paragraph (2), the Secretary shall
                                                                       12                         carry out repairs to address primary seismic
                                                                       13                         and safety risks in accordance with the rec-
                                                                       14                         ommendations approved in the Willamette Falls
                                                                       15                         Locks report.
                                                                       16                         (7)      DEAUTHORIZATION.—Beginning                                      on   the
                                                                       17               date on which the Secretary makes the conveyance
                                                                       18               under paragraph (2), the Willamette Falls Locks
                                                                       19               project is no longer authorized.
                                                                       20      SEC. 336. REPEALS.

                                                                       21               (a) Section 710 of the Water Resources Development
                                                                       22 Act of 1986 (33 U.S.C. 2264) is repealed.
                                                                       23               (b) Section 1001 of the Water Resources Develop-
                                                                       24 ment Act of 1986 (33 U.S.C. 579a) is amended—



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00194   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             195
                                                                         1                        (1) in subsection (b), by striking paragraph (2)
                                                                         2              and redesignating paragraph (3) as paragraph (2);
                                                                         3              and
                                                                         4                        (2) by striking subsection (c).
                                                                         5              (c) Section 1001 of the Water Resources Reform and
                                                                         6 Development Act of 2014 (33 U.S.C. 2282c) is amend-
                                                                         7 ed—
                                                                         8                        (1) in subsection (d)—
                                                                         9                                 (A) in paragraph (1), by striking ‘‘Not-
                                                                       10                         withstanding the requirements of subsection (c),
                                                                       11                         the Secretary’’ and inserting ‘‘The Secretary’’;
                                                                       12                                  (B) by striking ‘‘subsections (a) and (c)’’
                                                                       13                         each place it appears and inserting ‘‘subsection
                                                                       14                         (a)’’; and
                                                                       15                                  (C) by striking paragraph (4); and
                                                                       16                         (2) by striking subsection (c) and redesignating
                                                                       17               subsections (d) through (g) as subsections (c)
                                                                       18               through (f), respectively.
                                                                       19               (d) Section 6003 of the Water Resources Reform and
                                                                       20 Development Act of 2014 (33 U.S.C. 579c), and the item
                                                                       21 relating to such section in the table of contents, are re-
                                                                       22 pealed.
                                                                       23               (e) Section 1301 of the Water Resources Develop-
                                                                       24 ment Act of 2016 (33 U.S.C. 579d), and the item relating



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25 to such section in the table of contents, are repealed.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00195   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             196
                                                                         1              (f) Section 1302 of the Water Resources Develop-
                                                                         2 ment Act of 2016 (33 U.S.C. 579c–1), and the item relat-
                                                                         3 ing to such section in the table of contents, are repealed.
                                                                         4              (g) Section 1301 of the Water Resources Develop-
                                                                         5 ment Act of 2018 (33 U.S.C. 579d–1), and the item relat-
                                                                         6 ing to such section in the table of contents, are repealed.
                                                                         7              (h) Section 1302 of the Water Resources Develop-
                                                                         8 ment Act of 2018 (33 U.S.C. 579c–2), and the item relat-
                                                                         9 ing to such section in the table of contents, are repealed.
                                                                       10           TITLE IV—WATER RESOURCES
                                                                       11                INFRASTRUCTURE
                                                                       12      SEC. 401. PROJECT AUTHORIZATIONS.

                                                                       13               The following projects for water resources develop-
                                                                       14 ment and conservation and other purposes, as identified
                                                                       15 in the reports titled ‘‘Report to Congress on Future Water
                                                                       16 Resources Development’’ submitted to Congress pursuant
                                                                       17 to section 7001 of the Water Resources Reform and Devel-
                                                                       18 opment Act of 2014 (33 U.S.C. 2282d) or otherwise re-
                                                                       19 viewed by Congress, are authorized to be carried out by
                                                                       20 the Secretary substantially in accordance with the plans,
                                                                       21 and subject to the conditions, described in the respective
                                                                       22 reports or decision documents designated in this section:
                                                                       23                         (1) NAVIGATION.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00196   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             197
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. AK         Port of Nome               May 29,              Federal: $368,173,000
                                                                                                   Modifications             2020                Non-Federal: $122,746,000
                                                                                                                                                 Total: $490,919,000

                                                                                   2. AK         Unalaska (Dutch            February 7,          Federal: $26,202,750
                                                                                                  Harbor) Chan-               2020               Non-Federal: $8,734,250
                                                                                                  nels                                           Total: $34,937,000

                                                                                   3. CT         New Haven Har-             May 7, 2020          Federal: $53,489,000
                                                                                                   bor Navigation                                Non-Federal: $18,822,000
                                                                                                   Improvement                                   Total: $72,311,000
                                                                                                   Project

                                                                                   4. NY,        New York and               April 23,            Federal: $18,940,000
                                                                                      NJ           New Jersey                 2020               Non-Federal: $6,310,000
                                                                                                   Harbor Anchor-                                Total: $25,250,000
                                                                                                   ages

                                                                                   5. TX         Gulf Intracoastal          October 23,          Total: $409,777,000, to be
                                                                                                   Waterway,                  2019                 derived 1⁄2 from the gen-
                                                                                                   Brazos River                                    eral fund of the Treasury
                                                                                                   Floodgates and                                  and 1⁄2 from the Inland
                                                                                                   Colorado River                                  Waterways Trust Fund.
                                                                                                   Locks

                                                                                   6. TX         Houston Ship               April 23,            Federal: $462,803,000
                                                                                                  Channel Expan-              2020               Non-Federal: $414,045,000
                                                                                                  sion Channel                                   Total: $876,848,000
                                                                                                  Improvement
                                                                                                  Project, Harris,
                                                                                                  Chambers, and
                                                                                                  Galveston
                                                                                                  Counties

                                                                                   7. TX         Matagorda Ship             November             Federal: $138,660,000
                                                                                                  Channel Im-                 15, 2019           Non-Federal: $79,664,000
                                                                                                  provement                                      Total: $218,324,000
                                                                                                  Project, Port
                                                                                                  Lavaca


                                                                         1                        (2) FLOOD RISK MANAGEMENT.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00197   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             198
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. AZ         Little Colorado            December             Federal: $52,462,000
                                                                                                   River at Wins-             14, 2018           Non-Federal: $28,249,000
                                                                                                   low, Navajo                                   Total: $80,711,000
                                                                                                   County

                                                                                   2. CA         Westminster, East          July 9, 2020         Federal: $314,506,000
                                                                                                  Garden Grove,                                  Non-Federal: $910,092,000
                                                                                                  California Flood                               Total: $1,224,598,000
                                                                                                  Risk Manage-
                                                                                                  ment

                                                                                   3. CT,        Westchester Coun-          May 7, 2020          Federal: $14,702,500
                                                                                      NY          ty Streams,                                    Non-Federal: $14,702,500
                                                                                                  Byram River                                    Total: $29,405,000
                                                                                                  Basin, Fairfield
                                                                                                  County, Con-
                                                                                                  necticut, and
                                                                                                  Westchester
                                                                                                  County, New
                                                                                                  York

                                                                                   4. ND         Souris River               April 16,            Federal: $58,041,750
                                                                                                   Basin Flood                2019               Non-Federal: $31,253,250
                                                                                                   Risk Manage-                                  Total: $89,295,000
                                                                                                   ment

                                                                                   5. NJ         Peckman River              April 29,            Federal: $95,022,000
                                                                                                   Basin                      2020               Non-Federal: $51,166,000
                                                                                                                                                 Total: $146,188,000

                                                                                   6. NM         Middle Rio                 March 13,            Federal: $190,538,000
                                                                                                   Grande Flood              2020                Non-Federal: $102,598,000
                                                                                                   Protection,                                   Total: $293,136,000
                                                                                                   Bernalillo to
                                                                                                   Belen

                                                                                   7. OK         Tulsa and West-            April 23,            Federal: $86,780,000
                                                                                                   Tulsa Levee                2020               Non-Federal: $46,728,000
                                                                                                   System, Tulsa                                 Total: $133,508,000
                                                                                                   County


                                                                         1                        (3) HURRICANE AND STORM DAMAGE RISK RE-
                                                                         2              DUCTION.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00198   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             199
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. DE         Delaware Bene-             March 6,             Initial Federal: $53,220,000
                                                                                                   ficial Use of             2020                Initial Non-Federal:
                                                                                                   Dredged Mate-                                   $28,660,000
                                                                                                   rial for the                                  Total: $81,880,000
                                                                                                   Delaware River                                Renourishment Federal:
                                                                                                                                                   $116,380,000
                                                                                                                                                 Renourishment Non-Federal:
                                                                                                                                                   $116,380,000
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $232,760,000

                                                                                   2. NJ         New Jersey Bene-           April 8,             Initial Federal: $80,780,000
                                                                                                   ficial Use of              2020               Initial Non-Federal:
                                                                                                   Dredged Mate-                                   $43,500,000
                                                                                                   rial for the                                  Total: $124,280,000
                                                                                                   Delaware River                                Renourishment Federal:
                                                                                                                                                   $82,140,000
                                                                                                                                                 Renourishment Non-Federal:
                                                                                                                                                   $82,140,000
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $164,280,000

                                                                                   3. NJ         Rahway River               June 9,              Federal: $46,754,000
                                                                                                   Basin, New                 2020               Non-Federal: $25,175,000
                                                                                                   Jersey Coastal                                Total: $71,929,000
                                                                                                   Storm Risk
                                                                                                   Management

                                                                                   4. NY         East Rockaway              August 22,           Initial Federal: $604,203,000
                                                                                                   Inlet to Rock-             2019               Initial Non-Federal: $0
                                                                                                   away Inlet and                                Total: $604,203,000
                                                                                                   Jamaica Bay,                                  Renourishment Federal:
                                                                                                   Atlantic Coast                                  $189,763,000
                                                                                                   of New York                                   Renourishment Non-Federal:
                                                                                                                                                   $189,763,000
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $379,526,000

                                                                                   5. NY         Hashamomuck                December 9,          Initial Federal: $11,549,000
                                                                                                  Cove Coastal                2019               Initial Non-Federal:
                                                                                                  Storm Risk                                       $6,218,000
                                                                                                  Management                                     Total: $17,767,000
                                                                                                                                                 Renourishment Federal:
                                                                                                                                                   $23,481,500
                                                                                                                                                 Renourishment Non-Federal:




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                                                                   $23,481,500
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $46,963,000



                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00199   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             200
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   6. RI         Pawcatuck River            December             Federal: $37,848,000
                                                                                                   Coastal Storm              19, 2018           Non-Federal: $20,379,000
                                                                                                   Risk Manage-                                  Total: $58,227,000
                                                                                                   ment Project

                                                                                   7. VA         Norfolk Coastal            February 5,          Federal: $909,040,000
                                                                                                   Storm Risk                 2019               Non-Federal: $489,480,000
                                                                                                   Management                                    Total: $1,398,520,000


                                                                         1                        (4) FLOOD                RISK         MANAGEMENT                   AND   ECO-

                                                                         2                 SYSTEM RESTORATION.—


                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. CO         South Platte               July 29,             Federal: $334,412,000
                                                                                                   River and Trib-            2019               Non-Federal: $200,406,000
                                                                                                   utaries, Adams                                Total: $534,818,000
                                                                                                   and Denver
                                                                                                   Counties

                                                                                   2. NY         Fire Island Inlet          July 9, 2020         Initial Federal:
                                                                                                   to Montauk                                      $1,541,981,000
                                                                                                   Point, New                                    Initial Non-Federal: $0
                                                                                                   York Reformu-                                 Total: $1,541,981,000
                                                                                                   lation                                        Renourishment Federal:
                                                                                                                                                   $742,926,500
                                                                                                                                                 Renourishment Non-Federal:
                                                                                                                                                   $742,926,500
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $1,485,853,000


                                                                         3                        (5) ECOSYSTEM RESTORATION.—




kjohnson on DSK79L0C42PROD with BILLS
                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00200   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             201
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. CA         Delta Islands and          December             Federal: $16,746,395
                                                                                                   Levees                     18, 2018           Non-Federal: $9,016,736
                                                                                                                                                 Total: $25,763,131

                                                                                   2. CA         Yuba River Eco-            June 20,             Federal: $65,014,326
                                                                                                   system Restora-            2019               Non-Federal: $35,008,268
                                                                                                   tion                                          Total: $100,022,594

                                                                                   3. FL         Comprehensive              April 8,             Federal: $372,232,000
                                                                                                   Everglades Res-            2020               Non-Federal: $368,528,000
                                                                                                   toration Plan,                                Total: $740,760,000
                                                                                                   Loxahatchee
                                                                                                   River Water-
                                                                                                   shed Restora-
                                                                                                   tion Project,
                                                                                                   Martin and
                                                                                                   Palm Beach
                                                                                                   Counties

                                                                                   4. IL         The Great Lakes            May 23,              Federal: $690,643,200
                                                                                                   and Mississippi           2019                Non-Federal: $172,660,800
                                                                                                   River Interbasin                              Total: $863,304,000
                                                                                                   Study - Bran-
                                                                                                   don Road, Will
                                                                                                   County

                                                                                   5. IL         South Fork of the          July 9, 2020         Federal: $11,657,000
                                                                                                   South Branch                                  Non-Federal: $6,277,000
                                                                                                   of the Chicago                                Total: $17,934,000
                                                                                                   River, Bubbly
                                                                                                   Creek, Eco-
                                                                                                   system Restora-
                                                                                                   tion

                                                                                   6. MD         Anacostia Water-           December             Federal: $23,171,000
                                                                                                   shed Restora-              19, 2018           Non-Federal: $12,476,000
                                                                                                   tion, Prince                                  Total: $35,647,000
                                                                                                   George’s Coun-
                                                                                                   ty

                                                                                   7. MO         St. Louis                  November 1,          Federal: $60,124,000
                                                                                                   Riverfront-                2019               Non-Federal: $32,375,000
                                                                                                   Meramec River                                 Total: $92,499,000
                                                                                                   Basin Eco-
                                                                                                   system Restora-




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                   tion




                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00201   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             202
                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   8. NM         Rio Grande, Envi-          August 5,            Federal: $16,163,000
                                                                                                   ronmental Man-             2019               Non-Federal: $8,703,000
                                                                                                   agement Pro-                                  Total: $24,866,000
                                                                                                   gram, Sandia
                                                                                                   Pueblo to Isleta
                                                                                                   Pueblo, New
                                                                                                   Mexico Eco-
                                                                                                   system Restora-
                                                                                                   tion

                                                                                   9. NY,        Hudson-Raritan             May 26,              Federal: $265,320,000
                                                                                      NJ          Estuary Eco-               2020                Non-Federal: $142,864,000
                                                                                                  system Restora-                                Total: $408,184,000
                                                                                                  tion

                                                                                   10. TX        Jefferson County           September            Federal: $37,615,000
                                                                                                   Ecosystem Res-             12, 2019           Non-Federal: $20,254,000
                                                                                                   toration                                      Total: $57,869,000


                                                                         1                        (6) WATER SUPPLY.—

                                                                                                                               C.
                                                                                                                             Date of                            D.
                                                                                     A.                     B.              Report of                       Estimated
                                                                                    State                  Name              Chief of                         Costs
                                                                                                                            Engineers

                                                                                   1. OR         Willamette River           December             Federal: $0
                                                                                                  Basin Review                18, 2019           Non-Federal: $0
                                                                                                  Reallocation,                                  Total: $0


                                                                         2                        (7) MODIFICATIONS AND OTHER PROJECTS.—

                                                                                                                               C.                               D.
                                                                                     A.                     B.               Date of                        Estimated
                                                                                    State                  Name             Decision                          Costs
                                                                                                                            Document

                                                                                   1. FL         Caloosahatchee             July 24,             Federal: $503,466,500
                                                                                                   River West                 2020               Non-Federal: $503,466,500
                                                                                                   Basin Storage                                 Total: $1,006,933,000
                                                                                                   Reservoir (C-43




kjohnson on DSK79L0C42PROD with BILLS
                                                                                                   WBSR)




                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00202   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             203
                                                                                                                               C.                               D.
                                                                                     A.                     B.               Date of                        Estimated
                                                                                    State                  Name             Decision                          Costs
                                                                                                                            Document

                                                                                   2. KY         Kentucky Lock              June 9,              Total: $1,152,769,000 (to be
                                                                                                                              2020                 derived 1⁄2 from the gen-
                                                                                                                                                   eral fund of the Treasury
                                                                                                                                                   and 1⁄2 from the Inland
                                                                                                                                                   Waterways Trust Fund)

                                                                                   3. NC         Carolina Beach             June 16,             Federal: $24,205,000
                                                                                                   Integrated                 2020               Non-Federal: $24,205,000
                                                                                                   Beach Re-                                     Total: $48,410,000
                                                                                                   nourishment

                                                                                   4. NC         Wrightsville               July 2, 2020         Federal: $53,788,000
                                                                                                  Beach                                          Non-Federal: $22,329,000
                                                                                                                                                 Total: $76,117,000
                                                                                                                                                 Renourishment Federal:
                                                                                                                                                   $14,553,000
                                                                                                                                                 Renourishment Non-Federal:
                                                                                                                                                   $14,553,000
                                                                                                                                                 Renourishment Total:
                                                                                                                                                   $29,106,000

                                                                                   5. TX         Corpus Christi             May 4, 2020          Federal: $403,000,000
                                                                                                   Ship Channel,                                 Non-Federal: $273,010,000
                                                                                                   Deepening and                                 Total: $676,010,000
                                                                                                   Widening and
                                                                                                   Barge Shelves


                                                                         1     SEC. 402. SPECIAL RULES.

                                                                         2              (a)        GREAT               LAKES          AND          MISSISSIPPI             RIVER
                                                                         3 INTERBASIN PROJECT, BRANDON ROAD, WILL COUNTY,
                                                                         4 ILLINOIS.—The Secretary shall carry out the project for
                                                                         5 ecosystem restoration, Great Lakes and Mississippi River
                                                                         6 Interbasin project, Brandon Road, Will County, Illinois,
                                                                         7 authorized by section 401 of this Act, substantially in ac-
                                                                         8 cordance with the terms and conditions described in the
                                                                         9 Report of the Chief of Engineers, dated May 23, 2019,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       10 with the following modifications:


                                                                                    HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00203   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             204
                                                                         1                        (1) The Federal share of the cost of construc-
                                                                         2              tion shall be 80 percent.
                                                                         3                        (2) The Secretary may include the addition or
                                                                         4              substitution of technologies or measures not de-
                                                                         5              scribed in the report, as the Secretary determines to
                                                                         6              be advisable.
                                                                         7              (b) WILLAMETTE RIVER BASIN REVIEW REALLOCA-
                                                                         8     TION STUDY.—The Secretary shall carry out the project

                                                                         9 for water supply, Willamette River Basin Review Realloca-
                                                                       10 tion, Oregon, authorized by section 401 of this Act, sub-
                                                                       11 stantially in accordance with the terms and conditions de-
                                                                       12 scribed in the Report of the Chief of Engineers, dated De-
                                                                       13 cember 18, 2019, with the following modifications:
                                                                       14                         (1) The Secretary shall meet the obligations of
                                                                       15               the Corps of Engineers under the Endangered Spe-
                                                                       16               cies Act of 1973 by complying with the June 2019
                                                                       17               NMFS Willamette Basin Review Study Biological
                                                                       18               Opinion Reasonable and Prudent Alternative until
                                                                       19               such time, if any, as it is modified or replaced, in
                                                                       20               whole or in part, through the consultation process
                                                                       21               under section 7(a) of the Endangered Species Act of
                                                                       22               1973.
                                                                       23                         (2) The Secretary may reallocate not more than
                                                                       24               10 percent of overall storage in the joint conserva-



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               tion pool, as authorized by this Act and without fur-


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00204   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             205
                                                                         1              ther congressional action, if such reallocation is con-
                                                                         2              sistent with the ongoing consultation under section
                                                                         3              7(a) of the Endangered Species Act of 1973 related
                                                                         4              to Willamette Valley System operations.
                                                                         5                        (3) The Secretary shall ensure that the revised
                                                                         6              reallocation is not reallocated from a single storage
                                                                         7              use, does not seriously affect authorized project pur-
                                                                         8              poses, and does not otherwise involve major oper-
                                                                         9              ational changes to the project.
                                                                       10               (c) CANO MARTIN PENA, SAN JUAN, PUERTO
                                                                       11 RICO.—Section 5127 of the Water Resources Develop-
                                                                       12 ment Act of 2007 (121 Stat. 1242) is amended by striking
                                                                       13 ‘‘$150,000,000’’ and inserting ‘‘$232,430,000’’.
                                                                       14      SEC. 403. AUTHORIZATION OF PROJECTS BASED ON FEASI-

                                                                       15                              BILITY          STUDIES            PREPARED                 BY   NON-FED-

                                                                       16                              ERAL INTERESTS.

                                                                       17               (a) IN GENERAL.—The Secretary is authorized to
                                                                       18 carry out the following projects for water resources devel-
                                                                       19 opment and conservation and other purposes, subject to
                                                                       20 subsection (b):
                                                                       21                         (1) FORT PIERCE, ST. LUCIE COUNTY, FLOR-
                                                                       22               IDA.—The project for hurricane and storm damage

                                                                       23               reduction, Fort Pierce, St. Lucie County, Florida, as
                                                                       24               described in the review assessment of the Secretary,



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               titled ‘‘Review Assessment of St. Lucie County,


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00205   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             206
                                                                         1              Florida Fort Pierce Shore Protection Project Section
                                                                         2              203 Integrated Feasibility Study and Environmental
                                                                         3              Assessment (June 2018)’’ and dated July 2018, at
                                                                         4              a total cost of $33,107,639, and at an estimated
                                                                         5              total cost of $97,958,972 for periodic nourishment
                                                                         6              over the 50-year life of the project.
                                                                         7                        (2) BAPTISTE COLLETTE BAYOU, LOUISIANA.—
                                                                         8              The project for navigation, Baptiste Collette Bayou,
                                                                         9              Louisiana, as described in the review assessment of
                                                                       10               the        Secretary,             titled         ‘‘Review           Assessment     of
                                                                       11               Plaquemines Parish Government’s Section 203
                                                                       12               Study Baptiste Collette Bayou Navigation Channel
                                                                       13               Deepening Project Integrated Feasibility Study and
                                                                       14               Environmental Assessment (January 2017, Amend-
                                                                       15               ed April 2018)’’ and dated June 2018, at a total
                                                                       16               cost of $44,920,000.
                                                                       17                         (3) HOUMA NAVIGATION CANAL, LOUISIANA.—
                                                                       18               The project for navigation, Houma Navigation
                                                                       19               Canal, Louisiana, as described in the review assess-
                                                                       20               ment of the Secretary, titled ‘‘Review Assessment of
                                                                       21               Houma Navigation Canal Deepening Project Section
                                                                       22               203 Integrated Feasibility Report and DRAFT En-
                                                                       23               vironmental Impact Statement (June 2018)’’ and
                                                                       24               dated July 2018, at a total cost of $253,458,000.



kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00206   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             207
                                                                         1                        (4) PORT FOURCHON BELLE PASS CHANNEL,
                                                                         2              LOUISIANA.—The                       project           for       navigation,          Port
                                                                         3              Fourchon Belle Pass Channel, Louisiana, as de-
                                                                         4              scribed in the review assessment of the Secretary, ti-
                                                                         5              tled ‘‘Review Assessment of Port Fourchon Belle
                                                                         6              Pass Channel Deepening Project Section 203 Feasi-
                                                                         7              bility Study (January 2019, revised January 2020)’’
                                                                         8              and         dated         April           2020,        at      a     total         cost   of
                                                                         9              $95,483,000.
                                                                       10                         (5) WILMINGTON HARBOR, NORTH CAROLINA.—
                                                                       11               The project for navigation, Wilmington Harbor,
                                                                       12               North Carolina, as described in the review assess-
                                                                       13               ment of the Secretary, titled ‘‘Review Assessment of
                                                                       14               Wilmington Harbor, North Carolina Navigation Im-
                                                                       15               provement Project Integrated Section 203 Study &
                                                                       16               Environmental Report (February 2020)’’ and dated
                                                                       17               May 2020, at a total cost of $834,093,000.
                                                                       18                         (6) CHACON CREEK, TEXAS.—The project for
                                                                       19               flood risk management, ecosystem restoration, and
                                                                       20               other purposes, Chacon Creek, Texas, as described
                                                                       21               in the review assessment of the Secretary, titled
                                                                       22               ‘‘Review Assessment of Chacon Creek, Texas Section
                                                                       23               203 Integrated Feasibility Report and DRAFT En-
                                                                       24               vironmental Assessment (August 2018)’’ and dated



kjohnson on DSK79L0C42PROD with BILLS
                                                                       25               September 2018, at a total cost of $51,973,000.


                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00207   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             208
                                                                         1              (b) REQUIREMENTS.—The Secretary may only carry
                                                                         2 out a project authorized under subsection (a)—
                                                                         3                        (1) substantially in accordance with the applica-
                                                                         4              ble review assessment for the project submitted by
                                                                         5              the Secretary under section 203(c) of the Water Re-
                                                                         6              sources Development Act of 1986, as identified in
                                                                         7              subsection (a) of this section, and subject to such
                                                                         8              modifications or conditions as the Secretary con-
                                                                         9              siders appropriate and identifies in a final assess-
                                                                       10               ment that addresses the concerns, recommendations,
                                                                       11               and conditions identified by the Secretary in the ap-
                                                                       12               plicable review assessment; and
                                                                       13                         (2) after the Secretary transmits to the Com-
                                                                       14               mittee on Transportation and Infrastructure of the
                                                                       15               House of Representatives and the Committee on En-
                                                                       16               vironment and Public Works of the Senate such
                                                                       17               final assessment.
                                                                       18               (c) TECHNICAL CORRECTION.—Section 203(c)(1) of
                                                                       19 the Water Resources Development Act of 1986 (33 U.S.C.
                                                                       20 2231(c)(1)) is amended, in the matter preceding subpara-
                                                                       21 graph (A), by striking ‘‘a report’’ and inserting ‘‘an as-
                                                                       22 sessment’’.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00208   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575
                                                                                                                             209
                                                                         1         TITLE V—BUDGETARY EFFECTS
                                                                         2     SEC. 501. DETERMINATION OF BUDGETARY EFFECTS.

                                                                         3              The budgetary effects of this Act, for the purpose of
                                                                         4 complying with the Statutory Pay-As-You-Go Act of 2010,
                                                                         5 shall be determined by reference to the latest statement
                                                                         6 titled ‘‘Budgetary Effects of PAYGO Legislation’’ for this
                                                                         7 Act, submitted for printing in the Congressional Record
                                                                         8 by the Chairman of the House Budget Committee, pro-
                                                                         9 vided that such statement has been submitted prior to the
                                                                       10 vote on passage.
                                                                                        Passed the House of Representatives July 29, 2020.
                                                                                        Attest:                             CHERYL L. JOHNSON,
                                                                                                                                             Clerk.
                                                                                                                                   By GLORIA J. LETT,

                                                                                                                                                            Deputy Clerk.




kjohnson on DSK79L0C42PROD with BILLS
                                                                                   HR 7575 RDS

                                        VerDate Sep 11 2014   21:52 Jan 04, 2021   Jkt 019200   PO 00000   Frm 00209   Fmt 6652   Sfmt 6201   E:\BILLS\H7575.RDS   H7575


File and source

File
BILLS_bills-116hr7575rds_bills-116hr7575rds.pdf
Size
546,128 bytes
SHA-256
b68e51e8faca3535e6441e9beacf5e03739ecdff2df8be773c3c217a96cf1454
Our copy
BILLS_bills-116hr7575rds_bills-116hr7575rds.pdf
Original
www.govinfo.gov
Back to top