H.R. 5905 is the Joint Long-Term Storage Act of 2020, a bill introduced in the House of Representatives on February 13, 2020 by Pappas, Schweikert and Sherrill and referred to the Committee on Transportation and Infrastructure and in addition to the Committee on Armed Services. It directs the Director of ARPA–E to establish, not later than 200 days after enactment, a demonstration initiative for long-duration energy storage technologies, with a joint program run with the Director of the Environmental Security Technology Certification Program. Section 3 authorizes $20,000,000 for fiscal year 2021, $40,000,000 for fiscal year 2022 and $60,000,000 for each of fiscal years 2023 through 2025. Section 4 amends the America COMPETES Act for the DAYS program.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Bills Bills 116Hr5905Ih Bills 116Hr5905Ih
Case
Bills Bills 116Hr5905Ih Bills 116Hr5905Ih

Cite this document

“H.R. 5905, Joint Long-Term Storage Act of 2020.” Original at www.govinfo.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/bills-bills-116hr5905ih-bills-116hr5905ih/, SHA-256 db23e22e4a6e42f3660062ac1a5e5191e17f9469c06f457f3188e56fbd9d38da.

Full text

                                                                                                                                                                          I




                                                                       116TH CONGRESS
                                                                          2D SESSION
                                                                                                            H. R. 5905
                                                                       To require the Secretary of Energy to establish a demonstration initiative
                                                                           focused on the development of long-duration energy storage technologies,
                                                                           including a joint program to be established in consultation with the
                                                                           Secretary of Defense, and for other purposes.




                                                                                     IN THE HOUSE OF REPRESENTATIVES
                                                                                                     FEBRUARY 13, 2020
                                                                       Mr. PAPPAS (for himself, Mr. SCHWEIKERT, and Ms. SHERRILL) introduced
                                                                           the following bill; which was referred to the Committee on Transportation
                                                                           and Infrastructure, and in addition to the Committee on Armed Services,
                                                                           for a period to be subsequently determined by the Speaker, in each case
                                                                           for consideration of such provisions as fall within the jurisdiction of the
                                                                           committee concerned




                                                                                                                 A BILL
                                                                       To require the Secretary of Energy to establish a demonstra-
                                                                           tion initiative focused on the development of long-dura-
                                                                           tion energy storage technologies, including a joint pro-
                                                                           gram to be established in consultation with the Secretary
                                                                           of Defense, and for other purposes.

                                                                         1              Be it enacted by the Senate and House of Representa-
                                                                         2 tives of the United States of America in Congress assembled,
                                                                         3     SECTION 1. SHORT TITLE.




pamtmann on DSKBC07HB2PROD with BILLS
                                                                         4              This Act may be cited as the ‘‘Joint Long-Term Stor-
                                                                         5 age Act of 2020’’.


                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00001   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  2
                                                                         1     SEC. 2. PURPOSES.

                                                                         2              The purposes of this Act are—
                                                                         3                        (1) to facilitate the development of long-dura-
                                                                         4              tion energy storage technologies;
                                                                         5                        (2) to increase the commercial viability of long-
                                                                         6              duration energy storage technologies; and
                                                                         7                        (3) to increase the energy resilience and energy
                                                                         8              security and national security of the United States
                                                                         9              through the use of long-duration energy storage
                                                                       10               technologies.
                                                                       11      SEC. 3. LONG-DURATION ENERGY STORAGE DEMONSTRA-

                                                                       12                              TION INITIATIVE.

                                                                       13               (a) DEFINITIONS.—In this section:
                                                                       14                         (1) DIRECTOR OF ARPA–E.—The term ‘‘Direc-
                                                                       15               tor of ARPA–E’’ means the Secretary of Energy,
                                                                       16               acting through the Director of the Advanced Re-
                                                                       17               search Projects Agency–Energy.
                                                                       18                         (2) DIRECTOR OF ESTCP.—The term ‘‘Director
                                                                       19               of ESTCP’’ means the Secretary of Defense, acting
                                                                       20               through the Director of the Environmental Security
                                                                       21               Technology Certification Program of the Depart-
                                                                       22               ment of Defense.
                                                                       23                         (3) DIRECTORS.—The term ‘‘Directors’’ means
                                                                       24               the Director of ARPA–E and the Director of




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       25               ESTCP, acting jointly.


                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00002   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  3
                                                                         1                        (4) INITIATIVE.—The term ‘‘Initiative’’ means
                                                                         2              the demonstration initiative established under sub-
                                                                         3              section (b).
                                                                         4                        (5) JOINT PROGRAM.—The term ‘‘Joint Pro-
                                                                         5              gram’’ means the joint program established under
                                                                         6              subsection (f).
                                                                         7              (b) ESTABLISHMENT.—Not later than 200 days after
                                                                         8 the date of enactment of this Act, the Director of ARPA–
                                                                         9 E shall establish a demonstration initiative composed of
                                                                       10 demonstration projects focused on the development of
                                                                       11 long-duration energy storage technologies.
                                                                       12               (c) GOALS.—The goals of the Initiative shall be—
                                                                       13                         (1) to demonstrate the potential benefits of
                                                                       14               long-duration energy storage to—
                                                                       15                                  (A) the resilience of the electricity grid, in-
                                                                       16                         cluding the security of critical infrastructure;
                                                                       17                         and
                                                                       18                                  (B) efficient use of the electricity grid
                                                                       19                         through—
                                                                       20                                         (i) peak load reduction; or
                                                                       21                                         (ii) avoided investments in traditional
                                                                       22                                  grid infrastructure;
                                                                       23                         (2) to increase the commercial viability of long-




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       24               duration energy storage technologies;




                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00003   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  4
                                                                         1                        (3)(A) to identify the range of services that
                                                                         2              long-duration energy storage technologies can pro-
                                                                         3              vide to the electricity grid; and
                                                                         4                        (B) to the maximum extent practicable, to
                                                                         5              quantify the value of those services;
                                                                         6                        (4) to investigate challenges to the greater de-
                                                                         7              ployment of long-duration energy storage tech-
                                                                         8              nologies;
                                                                         9                        (5) to identify and develop a range of tech-
                                                                       10               nology types; and
                                                                       11                         (6) to improve the integration of energy storage
                                                                       12               and the grid.
                                                                       13               (d) SELECTION OF PROJECTS.—To the maximum ex-
                                                                       14 tent practicable, in selecting demonstration projects to
                                                                       15 participate in the Initiative, the Director of ARPA–E
                                                                       16 shall—
                                                                       17                         (1) ensure a range of technology types;
                                                                       18                         (2) ensure regional diversity among projects, in-
                                                                       19               cluding appropriate representation of rural areas;
                                                                       20                         (3) consider microgrid, islanded, or off-grid ap-
                                                                       21               plications; and
                                                                       22                         (4) ensure that any project selected is designed
                                                                       23               to achieve one or more of the goals described in sub-




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       24               section (c).




                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00004   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  5
                                                                         1              (e) COOPERATION WITH ELECTRIC UTILITIES.—A
                                                                         2 demonstration project selected to participate in the Initia-
                                                                         3 tive may be carried out in cooperation with the electric
                                                                         4 utility that owns the grid facilities in the electricity control
                                                                         5 area in which the demonstration project is carried out.
                                                                         6              (f) JOINT PROGRAM.—
                                                                         7                        (1) ESTABLISHMENT.—As part of the Initia-
                                                                         8              tive, the Director of ARPA–E, in consultation with
                                                                         9              the Director of ESTCP, shall establish within the
                                                                       10               Department of Energy a joint program to carry out
                                                                       11               projects—
                                                                       12                                  (A) to demonstrate promising long-dura-
                                                                       13                         tion energy storage technologies at different
                                                                       14                         scales; and
                                                                       15                                  (B) to help new, innovative long-duration
                                                                       16                         energy storage technologies become commer-
                                                                       17                         cially viable.
                                                                       18                         (2) MEMORANDUM OF UNDERSTANDING.—Not
                                                                       19               later than 200 days after the date of enactment of
                                                                       20               this Act, the Director of ARPA–E shall enter into
                                                                       21               a memorandum of understanding with the Director
                                                                       22               of ESTCP to jointly administer the Joint Program.
                                                                       23                         (3) INFRASTRUCTURE.—In carrying out the




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       24               Joint Program, the Directors shall—




                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00005   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  6
                                                                         1                                 (A) use existing test-bed infrastructure
                                                                         2                        at—
                                                                         3                                        (i) Department of Energy facilities;
                                                                         4                                 and
                                                                         5                                        (ii) Department of Defense installa-
                                                                         6                                 tions; and
                                                                         7                                 (B) develop new infrastructure for identi-
                                                                         8                        fied projects, if appropriate.
                                                                         9                        (4) GOALS AND METRICS.—The Directors shall
                                                                       10               develop goals and metrics for technological progress
                                                                       11               under the Joint Program consistent with energy re-
                                                                       12               silience and energy security policies.
                                                                       13                         (5) SELECTION OF PROJECTS.—
                                                                       14                                  (A) IN GENERAL.—To the maximum ex-
                                                                       15                         tent practicable, in selecting projects to partici-
                                                                       16                         pate in the Joint Program, the Directors
                                                                       17                         shall—
                                                                       18                                         (i) ensure that projects are carried
                                                                       19                                  out under conditions that represent a vari-
                                                                       20                                  ety of environments with different physical
                                                                       21                                  conditions and market constraints; and
                                                                       22                                         (ii) ensure an appropriate balance
                                                                       23                                  of—




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       24                                                  (I) larger, higher-cost projects;
                                                                       25                                         and


                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00006   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  7
                                                                         1                                                 (II) smaller, lower-cost projects.
                                                                         2                                 (B) PRIORITY.—In carrying out the Joint
                                                                         3                        Program, the Directors shall give priority to
                                                                         4                        demonstration projects that—
                                                                         5                                        (i) make available to the public key
                                                                         6                                 engineering and field data that will accel-
                                                                         7                                 erate deployment of long-duration energy
                                                                         8                                 storage technologies; and
                                                                         9                                        (ii) will be carried out in the field.
                                                                       10                         (6) STATES AND PRIVATE SECTOR ENTITIES.—
                                                                       11               In carrying out the Joint Program, the Directors
                                                                       12               shall encourage—
                                                                       13                                  (A) States to become laboratories of inno-
                                                                       14                         vation in the development of long-duration en-
                                                                       15                         ergy storage technologies; and
                                                                       16                                  (B) collaboration between participants in
                                                                       17                         the Joint Program, States, and other appro-
                                                                       18                         priate private sector entities.
                                                                       19               (g) AUTHORIZATION OF APPROPRIATIONS.—There
                                                                       20 are authorized to be appropriated to carry out the Initia-
                                                                       21 tive—
                                                                       22                         (1) $20,000,000 for fiscal year 2021;
                                                                       23                         (2) $40,000,000 for fiscal year 2022; and




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       24                         (3) $60,000,000 for each of fiscal years 2023
                                                                       25               through 2025.


                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00007   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  8
                                                                         1     SEC. 4. AUTHORIZATION OF APPROPRIATIONS FOR THE

                                                                         2                             DAYS        PROGRAM                OF      THE        ADVANCED     RE-

                                                                         3                             SEARCH PROJECTS AGENCY–ENERGY.

                                                                         4              Section 5012(o) of the America COMPETES Act (42
                                                                         5 U.S.C. 16538(o)) is amended—
                                                                         6                        (1) in paragraph (2)—
                                                                         7                                 (A) by redesignating subparagraphs (A)
                                                                         8                        through (E) as clauses (i) through (v), respec-
                                                                         9                        tively, and indenting appropriately;
                                                                       10                                  (B) by striking the paragraph designation
                                                                       11                         and heading and all that follows through ‘‘para-
                                                                       12                         graphs (4) and (5)’’ in the matter preceding
                                                                       13                         clause (i) (as so redesignated) and inserting the
                                                                       14                         following:
                                                                       15                         ‘‘(2) AUTHORIZATION OF APPROPRIATIONS.—
                                                                       16                                  ‘‘(A) IN GENERAL.—Subject to paragraph
                                                                       17                         (4)’’; and
                                                                       18                                  (C) by inserting after clause (v) (as so re-
                                                                       19                         designated) the following:
                                                                       20                                  ‘‘(B) DAYS PROGRAM.—There is author-
                                                                       21                         ized to be appropriated to carry out the Dura-
                                                                       22                         tion Addition to electricitY Storage program
                                                                       23                         (also known as the ‘DAYS program’) of ARPA–
                                                                       24                         E $60,000,000 for each of fiscal years 2020




pamtmann on DSKBC07HB2PROD with BILLS
                                                                       25                         through 2024.’’; and


                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00008   Fmt 6652   Sfmt 6201   E:\BILLS\H5905.IH   H5905
                                                                                                                                  9
                                                                         1                        (2) in paragraph (4), in the matter preceding
                                                                         2              subparagraph (A), by striking ‘‘paragraph (2)’’ and
                                                                         3              inserting ‘‘paragraph (2)(A)’’.
                                                                                                                                  Æ




pamtmann on DSKBC07HB2PROD with BILLS
                                                                                   •HR 5905 IH

                                        VerDate Sep 11 2014   02:00 Feb 20, 2020   Jkt 099200   PO 00000   Frm 00009   Fmt 6652   Sfmt 6301   E:\BILLS\H5905.IH   H5905


File and source

File
BILLS_bills-116hr5905ih_bills-116hr5905ih.pdf
Size
241,115 bytes
SHA-256
db23e22e4a6e42f3660062ac1a5e5191e17f9469c06f457f3188e56fbd9d38da
Our copy
BILLS_bills-116hr5905ih_bills-116hr5905ih.pdf
Original
www.govinfo.gov
Back to top