Innovation and Technology Transportation Fund (ITTF) Report to the 2025 General Assembly

Summary

Innovation and Technology Transportation Fund (ITTF) Report to the 2025 General Assembly. It states that the fund was created to pay for pilot programs and fully developed initiatives pertaining to high-tech infrastructure improvements, and that as of August 31, 2025 it had 60 active projects with a value of $156.2M. The report evaluates completed projects, including the Arlington County Dynamic Parking Pricing project (project cost $5,099,284), the Regional Multi-Modal Mobility Program Data-Exchange Platform ($2,775,000) and the I-95 Variable Speed Limit System ($2,404,000). It also lists recently completed and FY26 introduced projects, with an appendix table of projects by VDOT district, cost, current phase and delivery date.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Innovation and Technology Transportation Fund (ITTF) Report to the 2025 General Assembly.” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2026-rd82-0195a30f77/, SHA-256 aaa4b58e287cfbf92f0bb3349b176eb87a901ec54add9551aff49ea79850b897.

Full text

            Innovation and
               Technology
       Transportation Fund
                     (ITTF)

              Report to the
2025      General Assembly
TABLE OF    3   What is the ITTF

CONTENTS
            5   ITTF Program Status




            6   Project Evaluations




           11   Recently Completed Projects




           18   FY26 Introduced Projects




           23   Appendix
Section 33.2-1531 of the Code of Virginia created the Innovation and Technology
Transportation Fund (ITTF). ITTF monies are to be used solely for the purposes of funding
pilot programs and fully developed initiatives pertaining to high-tech infrastructure
improvements.

“High-tech infrastructure improvements” relate to projects or programs that reduce
congestion, improve mobility, improve safety, provide up-to-date travel data, or improve
emergency response.

Section 33.2-1531 further directs the Commissioner of Highways to report annually on the
use of monies in the Innovation and Technology Transportation Fund.


                                      3 | 2025 ITTF
ITTF Focuses

                                 The ITTF provides funding specifically for the purposes of funding pilot programs
                                and fully developed initiatives pertaining to high-tech infrastructure improvements:


          The ITTF program enhances
          road safety through innovative                                                                        The ITTF program advances mobility
          technologies and strategies,                                                                                 through investments in smart
                                                                  IMPROVING
          aligning with the agency’s                                SAFETY                                         infrastructure and transportation
          commitment to reducing crashes.                                                                     innovation, creating a more connected
                                                                                                           and accessible transportation network for
                                                                                                                                 the Commonwealth.
                                                                                             IMPROVING
                                                 IMPROVING                                    MOBILITY
                                                  TRAVELER
                                                INFORMATION
                                                                    ITTF
The ITTF program empowers
                                                                  PURPOSES
travelers with real-time updates on
road conditions, closures, and road
impacting events, facilitating more                                                                      The ITTF program leverages technology
informed and efficient travel.                                                                           and data-driven approaches to optimize
                                                                                                             traffic flow, reduce bottlenecks, and
                                                                                                               improve overall congestion for the
                                                                                       REDUCING                                   traveling public.
                                                          ENHANCING                   CONGESTION
                                                          EMERGENCY
                                                           RESPONSE

            The ITTF program integrates technology
            to expedite first responders’ access to
            incident information, to enable swift and
            effective responses to critical situations.


                                                                      4 | 2025 ITTF
ITTF PROGRAM


                                                                                                    IMPROVING
                                                                                                      SAFETY




                                                                                                                       IMPROVING
                                                                                                                        MOBILITY
      ACTIVE PROJECTS                          ITTF FOCUS AREAS
                                                                                   IMPROVING
                                                                                    TRAVELER
                                                                                  INFORMATION
                                                                                                      ITTF
                                                                                                    PURPOSES
          as of August 31, 2025

    60                  $156.2M
Active Projects        Active Projects Value
                                                                                                                 REDUCING
                                                                                            ENHANCING           CONGESTION
                                                                                            EMERGENCY
                                                                                             RESPONSE



  COMPLETED PROJECTS                           PROJECT STATUS SUMMARY
     September 2024 – August 2025              The duration of each project varies based on its complexity. A simple ITTF project

                    10                         may be completed within a year. Complex projects may take multiple years to complete.

              Completed Projects



        NEW PROJECTS                                       12                             22                                 26
     4                  $21.7M                         Scoping/Study                     Design                          Installation
   Projects               Projects Value

                                                    5 | 2025 ITTF
                PROJECT
                EVALUATIONS
                This section features on-going, multi-year evaluations
                of completed projects.




6 | 2025 ITTF
Arlington County
Dynamic Parking Pricing                                                                     Overview
                                                                                            Location                 Arlington County
                                                                                            VDOT District            Northern Virginia
ITTF PURPOSES                                                                               Route                    Clarendon Blvd., Wilson Blvd., Fairfax Dr.
                                                                                            City/County              Arlington County
                                                                                            Project Cost             $5,099,284
                                                                                                                     Dynamic Parking Pricing has been active since November
2025 UPDATE                                                                                 2025 Milestones
                                                                                                                     2023.
                                                                                                                     Evaluation report will be completed in early 2026.
„ The Arlington County Performance Parking Pricing Pilot is in its second
   year.
„ Public awareness of pricing changes increased with each quarterly pricing
   change.                                                                                  Project Characteristics (2024 data)
„ VDOT and Arlington County continue to evaluate the project’s impact.                      Vehicle Hours of Delay                                                227,400

PROJECT DESCRIPTION                                                                         Vehicle Hours Cost of Delay                                           $9.5M
„ The Arlington County-managed project implemented a data-driven,
   variable-pricing system and a traveler information system for parking on
   metered blocks in Arlington County’s two Metrorail corridors (Rosslyn-Ballston
                                                                                            Results
   and Pentagon City/Crystal City) and in up to three County-owned, off-street              Focus           Metrics               2024/2025 Evaluation Results
   parking areas within those corridors that are regulated using parking meters.                        Vehicle Hours of
                                                                                            Congestion                   Nominal reduction in VHD.
„ The system includes technology to detect                                                              Delay(VHD)
   parking space occupancy, integrate with                                                                               Saturday data shows higher price sensitivity and
   the existing payment methods, and apply                                                                               shifting parking preferences.
                                                                                                        Increased
   dynamic pricing for 4,563 metered on-street                                              Congestion                   2025 data suggests possible trend in behavior
                                                                                                        Road Capacity
   spaces and three off-street, paid-parking                                                                             changes in high-demand areas (needs further
   facilities in the two major Metrorail corridors                                                                       study).
   in Arlington.                                                                                                         Apps for parking information and availability are
                                                                                                        Increased
„ The project’s purpose is to make priority                                                                              steadily increasing.
                                                                                            Information Parking
   parking spaces more available by increasing                                                                           Public perception of parking experience remains
                                                                                                        Information
   their turnover rate through pricing and                                                                               stable.
   information, and to reduce the negative
   impacts associated with the search for
   metered parking, such as double parking,
   cruising for parking, erratic and dangerous
   driving behavior, extra VMT, and emissions
   from search time.

                                                                         7| 7 | ITTF
                                                                           2025 2025 ITTF
Regional Multi-Modal Mobility
Program (RM3P) Data-Exchange                                                                      Overview
Platform (DEP)                                                                                    Location
                                                                                                  VDOT District
                                                                                                                          Greater Northern Virginia, Fredericksburg
                                                                                                                          Northern Virginia, Fredericksburg
ITTF PURPOSES                                                                                     Route                   Multiple Routes
                                                                                                  City/County             Northern Virginia and Metropolitan Fredericksburg area
                                                                                                  Project Cost            $2,775,000
                                                                                                                          Added 21 data sources.
                                                                                                  2025 Milestones         Observed greater use of data from the tool.
2025 UPDATE
„ The RM3P Data-Exchange Platform has been operational for 3 years.
„ VDOT continues to monitor the success of the Data-Exchange Platform and
                                                                                                  Projected Benefits
   number of data requests.                                                                       The DEP is the foundation of the RM3P program. It provides data for the three other
                                                                                                  RM3P elements to function. The three other elements are the AI-Based Decision
PROJECT DESCRIPTION                                                                               Support System, Dynamic Incentivization, and Commuter Parking Information Services.
                                                                                                  Additional benefits will accrue to these other RM3P initiatives.
„ The Data-Exchange Platform is a
   key component of Regional Multi-                                                                  „ Establishes a regional repository for the storing, sharing, and exchange of
   Modal Mobility Program (RM3P),                                                                       multi-modal operations data.
   a program to improve mobility in                                                                  „ Brings financial efficiency to RM3P activities.
   Northern Virginia and Metropolitan
                                                                                                     „ Streamlines easy data access with effective filtering tools.
   Fredericksburg. The Data-
   Exchange Platform will support                                                                    „ Supports the capabilities of the broader RM3P program to:
   the AI-Decision Support, Dynamic                                                                        „ Promote coordinated responses to travel disruptions.
   Incentivization, and Commuter
                                                                                                           „ Potentially improve safety by removing hazards more rapidly.
   Parking Information System which
   form the RM3P effort.                                                                                   „ Promote multi-modal collaborative planning.

„ RM3P will ultimately improve                                                                             „ Implement an incentives program enabling travelers to make informed
   mobility by using a new AI-based                                                                              travel choices.
   decision support system to manage major incidents, and by providing greater                             „ Encourage informed redirection of travel to alternative routes and
   information for motorists about travel and parking resources and incentives for                               modes during major incidents and intense congestion.
   travelers to consider alternate modes, routes, and departure times.
                                                                                                   Results
„ The Data-Exchange Platform is a continuously updated, cloud-based data                           Focus             Metrics             Year 2023         Year 2024     Jan - Sep 2025
   storage and exchange system that will support the RM3P program, travel routes,
   modes, and schedules during congestion events. These tools are dependent on                      Information       Data Requests         74,296          3,197,704      7,917,260
   the availability of real-time data.
„ The Data-Exchange Platform includes highway, bicycle, parking, signal, tolling
   and transit related data from both public and private sector entities. Data
   includes, but is not limited to volumes, speeds, state of play, toll rates, etc.

                                                                               8| 8 | ITTF
                                                                                 2025 2025 ITTF
  I-95 Variable Speed Limit
  (VSL) System
                                                                                             Overview
  ITTF PURPOSES                                                                              Location               I-95 in Spotsylvania County/City of Fredericksburg
                                                                                             VDOT District          Fredericksburg
                                                                                             Route                  I-95
                                                                                             City/County            Fredericksburg, Spotsylvania, Caroline
2025 UPDATE                                                                                  Project Cost           $2,404,000 (ITTF Funding for the I-95 VSL Algorithm)
„ VDOT’s Research Council continues to monitor the success of the I-95 VSL system,
                                                                                                                    Year 3 evaluation conducted.
  which continues to yield positive results.                                                 2025 Milestones
                                                                                                                    Project complete.
„ Another detector was placed at the north end of the study area to provide additional
  downstream data and improve proactive management of traffic in the corridor.
„ The I-95 NB Rappahannock Bridge construction project was completed in May 2024.
  This project may have influenced the amount of congestion and hence the potential          Roadway Characteristics
  for crashes.                                                                                                                                                                  2021
Project Purpose                                                                              Crashes                   2024-2025        2023–2024       2022–2023               Pre-
VDOT has installed variable speed limits on the I-95 northbound corridor between mile                                                                                      Implementation
markers 115 and 130 in Caroline and Spotsylvania Counties. This is to address crashes        Total Crashes                 205              247             286                 291
caused by unexpected speed differentials when encountering congestion or lane-
impacting events. LED signs displaying variable speed limits along with dynamic message      Fatal + Injury Crashes         56               51              58                 67
boards provide real-time information to drivers. The speed limits are reduced only           Daily Traffic Volume        52-63K           50-63K           49-57K             47-57K
when necessary based on traffic speed and volume data collected by vehicle detectors.
Enforcement authorities have access to real-time changes in the posted speed limits.
                                                                                             Results
Project Description                                                                          Safety 2024 – 2025
„ Install detectors, signs and cameras for the VSL (funded via I-95 Corridor program)        Total Crashes                86 fewer crashes from year prior to activation (-29.6%)
„ Develop the algorithm to assess traffic detector data to change the highway speed          Fatal + Injury Crashes       11 fewer crashes from year prior to activation (-16.4%)
  limits (ITTF funded)                                                                       Mobility (based on data from 6 AM-8 PM)
                                                                                             In 2024-2025, average travel times over the entire week have declined 13.8% versus the
                                                                                             year prior to VSL activation. Sunday average travel time has declined 19.6%.
                                                                                             In 2024-2025, reliability has improved by an average of 37.6% over the entire week
                                                                                             relative to the year before activation.




                                                                          9| 9 | ITTF
                                                                            2025 2025 ITTF
Fiber Network Stability                                                                          Overview
Enhancement                                                                                      Location
                                                                                                 VDOT District
                                                                                                                       Statewide
                                                                                                                       Multiple
                                                                                                 City/County           Multiple
ITTF PURPOSES                                                                                    Project Cost          $2,987,000
                                                                                                                       North/South route completed.
                                                                                                 2025 Milestones
                                                                                                                       Evaluation began.



2025 UPDATE                                                                                  Project Characteristics (2024 data)
„ North/South Fiber Route completed.                                                         Miles of fiber on new North/South corridor (blue line)            271
                                                                                             Number of better protected ITS devices on fiber                   2,624
PROJECT DESCRIPTION                                                                          Number of better protected traffic signals                        3,062
„ VDOT has a Fiber Network that utilizes a combination of VDOT-owned fiber
                                                                                             Miles of lighted fiber (Core Ring + North/South corridor)         1,256 miles
  as well as fibers obtained through Resource Sharing Agreements (RSA). This
  network connects VDOT’s Traffic Operations Centers (TOC) to multiple traffic
                                                                                                 Results
  control and monitoring devices, and to two data centers that host critical
  Traffic Operations systems.                                                                    Focus           Metrics                                 2024-2025     2023-2024
„ Prior to this project, VDOT’s five TOC’s had a core communication ring (see
                                                                                                                 Service-impacting fiber cuts resulting
                                                                                                 Travel Data     in loss of access to statewide Traffic 0              1
  diagram to the right). If the fiber was cut in two points, VDOT could lose
                                                                                                                 Operations systems
  access to multiple devices and communications to other TOC’s and data
  centers.                                                                                                       Reduction in rescheduling of
                                                                                                 Other                                                  6              10
                                                                                                                 construction activities
„ The purpose of this project is to enhance fiber network stability by creating an
  additional fiber ring. This additional fiber ring enhances the resiliency of the
  network with a redundant path.                                                                  Core Ring
                                                                                                  Path Built




                                                                          10 | 10
                                                                               2025| ITTF
                                                                                     2025 ITTF
                 RECENTLY COMPLETED
                 PROJECTS
                 This section discusses projects that were completed between
                 September 1, 2024, and August 30, 2025. The evaluation of
                 these projects are underway and will be discussed in future
                 reports.



11 | 2025 ITTF
          Resiliency for Technology Devices for Traffic Control and Timely Travel Data Systems

ITTF PURPOSES                                                                         Overview
                                                                                      Location                   Statewide
                                                                                      VDOT District              Statewide
                                                                                      City/County                Multiple
Description                                                                           Project Cost               $346,433
                                                                                                                 Project completed.
„ This project developed the setup for the Transportation Operations Service          2025 Milestones
                                                                                                                 Evaluation began.
   Center (TOSC) to monitor the transportation communications network for
   both network connection issues and cyber security events. This project
   connected all ITS and traffic signal devices with advanced applications to
   manage the status of these devices.
„ To promote the resiliency of the devices, VDOT first developed a state-owned
   fiber optic network, with a shared resource fiber optic network, to provide          Transportation Technology Devices (2024 data)
   communications versus using leased communications. VDOT is developing
   redundant communication paths or rings to its critical devices. VDOT also            Miles of lighted fiber                        1,256
   promoted its resilience by securing an on-call maintenance contract.                 Number of ITS devices on fiber                2,624
„ To further promote the resilience of transportation technology devices and
                                                                                        Number of traffic signals on fiber            3,062
   signals, VDOT developed a TOSC. The TOSC manages both a Network
   Operations Center and a Security Operations Center using advanced                    Number of detected events                     596
   messaging tools including VDOT’s Operations Technology Service and Asset
   Management System (OTSaAM).
„ This project provided the necessary tools to advance the TOSC, which is
   unique at a state Department of Transportation. The fundamental goal of the
   TOSC is to reduce device down time by monitoring and diagnosing issues
   proactively in the TOSC environment to then dispatch the best resources or
   to redirect communications to the device.


Benefits
Focus       Metrics                                     Anticipated Results
            Increase the number of detected network     Greater situation awareness
Travel Data issues and cyber security issues for        by detecting more events
            transportation technology devices           proactively




                                                                              12 | 2025 ITTF
           I-64 Afton Mountain Queue Warning System

ITTF PURPOSES                                                                           Overview
                                                                                        Location                 Afton Mountain
                                                                                        VDOT District            Culpeper, Staunton
                                                                                        Route                    I-64
Description                                                                             City/County              Albemarle, Nelson, Augusta
                                                                                        Project Cost             $3,900,000
„ The Afton Mountain crossing on I-64 presents many challenges including
   fog events and commercial vehicles traveling at low speeds. Both events              2025 Milestones          Project completed.
   can contribute to traffic congestion. Traffic congestion can cause secondary
   events such as rear-end collisions.
„ This project developed a new Congestion Warning System (CWS) that will
   analyze data from existing and new detector stations, notify Transportation
   Operations Center staff, and disseminate messaging to sign infrastructure.             Roadway Characteristics (2024 data)
„ The project integrated the CWS with the Advanced Traffic Management
                                                                                          Total # Incidents                              650
   System (ATMS) to automate detection messaging. By-lane traffic sensors are
   used to detect and notify travelers of upcoming congestion.                            Total # Secondary Incidents                    16
„ This project is part of a larger effort to improve the safety on I-64 as it             Daily Traffic Volume                           19,469
   crosses Afton Mountain. A concurrent project to improve the lighting system
   is underway. Both projects will be evaluated concurrently.                             Vehicle Hours of Delay                         42,908
                                                                                          Vehicle Hours Cost of Delay                    $1.8M



                                                                                        Benefits
                                                                                        Focus           Metrics                        Anticipated Results
                                                                                                                                       Reduction of primary and secondary
                                                                                        Safety          Collisions
                                                                                                                                       events
                                                                                                        Vehicle Hours
                                                                                        Congestion                                     Reduction in VHD
                                                                                                        of Delay (VHD)
                                                                                                        Number of congestion
                                                                                        Information                                    Greater frequency of notification
                                                                                                        notifications




                                                                                13 | 2025 ITTF
          Monitor Merrimac Memorial Bridge Tunnel Traffic Improvements

ITTF PURPOSES                                                                     Overview
                                                                                  Location                 Monitor Merrimac Bridge Tunnel
                                                                                  VDOT District            Hampton Roads
                                                                                  Route                    I-664
Description                                                                       City/County              Suffolk
                                                                                  Project Cost             $6,413,000
„ Upgrade dynamic message signs (DMS) and communications to integrate
  the signs with VDOT’s cloud-based Advanced Traffic Management System            2025 Milestones          Project completed.
  (ATMS). VDOT recently updated this system to provide redundant operations
  to promote resiliency of vital transportation infrastructure.
„ A total of 5 advanced DMS units were installed at the I-664 Monitor
  Merrimac Memorial Bridge Tunnel (MMMBT). Advanced messaging can now
  be provided in a more timely manner via the ATMS to support incident and
  emergency operation events, resulting in fewer traffic incidents and traffic    Roadway Characteristics (2024 data)
  backups during lane closure events.                                             Vehicle Hours of Delay                          564K
                                                                                  Vehicle Hours Cost of Delay                     $23M
                                                                                  Total # Incidents/Year                          1,886
                                                                                  Daily Traffic Volume                            69,367
                                                                                  Travel Time Index                               1.16


                                                                                  Benefits
                                                                                  Focus          Metrics                         Anticipated Results

                                                                                  Safety         Collisions                      Fewer secondary crashes

                                                                                                                                 Fewer VHD for construction and
                                                                                  Mobility       Travel Time Index
                                                                                                                                 maintenance events with lane closures
                                                                                                 # Response Plans                Increase use of DMS to provide real
                                                                                  Travel Data
                                                                                                 # Notifications                 time travel data to motorists




                                                                          14 | 2025 ITTF
                Automated Traffic Signal Performance Measures (ATSPM) Program - Foundational Projects

  ITTF PURPOSES
                                                                                                                                             Overview
                                                                                                                                             Location                           Statewide
                                                                                                                                             Foundation Projects Cost           $8,131,000
  Description                                                                                                                                2025 Milestones                    Three ATSPM foundation projects completed.
                                                                                                                                             Delivery Date                      ATSPM targeted completion is December 2026.
  „ ATSPM will offer VDOT the ability to manage its traffic signal program
     proactively by updating signal retimings based on performance and data.
  „ The ATSPM effort consists of projects including (1) high speed
     communications, (2) advanced traffic controllers (ATC), (3)
     configuration of a Central Traffic Signal System (CTSS), (4)
     deployment of the traffic signal software system, CTSS, and (5)
     configuration and activation of the ATSPM.                                                                                               ATSPM Foundation Elements Advancement
  „ VDOT established multiple projects to advance the ATSPM. The                                                                              Focus            Metrics                   Anticipated Results
     following table defines the foundational projects completed in 2025.
                                                                                                                                              Safety           Collisions                Reduced number and reduced severity
  „ The ATSPM’s full deployment is funded by multiple funding sources.
                                                                                                                                              Mobility         Travel Time Reliability   Improved reliability with vehicle detection

                                                                                                                                                               Vehicle Hours
                                                                                                                                              Congestion                                 Less delay waiting for traffic lights
                                                                                                                                                               of Delay (VHD)
                                                                                                                                              Emergency                                  First responders able to reach incidents
                                                                                                                                                               Incident Duration
                                                                                                                                              Response                                   faster with emergency vehicle preemption
                                                                                                                                                               Information for           Increased real-time intersection operation
                                                                                                                                              Information
                                                                                                                                                               Connected Vehicles        data without additional cost
 ATSPM Progress – for the foundational projects
Statewide Traffic Signal System Status
                         January 2022                                                                                                                                                September 2025
                                                                                                        50%


  3,137 Traffic Signals Statewide
                                                                                                                      58%

       High Speed Communications (2506 – 80%)                                                                                         With ITTF
       ATC / D4 Migration (2808 – 90%)                                                                                                and Other
       KITS
       CTSS Deployment (Configured – 2915 – 93%)                           25%                                               75%                            CTSS
                                                                                                          80%                          Funding              CTSS
       KITS
        CTSS Deployment (Live – 1829 – 58%)
       CTSS
       ATSPM (Active – 196 – 6%)                                                                          90%



                                                                                                         93%
                                                                                            6%
                                                                                                    100%




                Virginia Department of Transportation   Courtesy: Traffic Engineering / Mike Clements           Updated: 1/31/2022    1


                                                                                                                                     15 | 2025 ITTF
           Animal Detection Warning System

ITTF PURPOSES                                                                           Overview
                                                                                        Location               Southwest Virginia
                                                                                        VDOT District          Bristol
                                                                                        Route                  U.S. 460 (Kentucky state line to Grundy)
Description                                                                             City/County            Buchanan County
                                                                                        Project Cost           Study - $170K; Pilot Project - $640K
„ Study focused on the feasibility of using animal detection and driver warning
   systems with an emphasis on preventing elk strikes along Route 460 in                                       Pilot installation is complete.
   Buchanan County. The population of elk is increasing in this area of Virginia.       2025 Milestones        Dynamic message signs are currently going through testing and
                                                                                                               evaluation.
„ Findings of the study indicate that a pilot test would be feasible on Route
   460. Several potential technologies were identified, including radar, short
   and long-range thermal cameras, and buried cable systems.
„ A reduction in animal-vehicle collisions may occur when similar animal
   detection technologies are introduced.                                               Roadway Characteristics (2024 data)
                                                                                        Daily Traffic Volume                          3,458
                                                                                        Historical # Animal Strikes/Year              6




                                                                                        Benefits
                                                                                        Focus                  Metrics                    Anticipated Results
                                                                                                               Animal Collisions          Fewer events
                                                                                        Safety
                                                                                                               Secondary Incidents        Fewer events

                                                                                        Travel Data            # Notifications            Improved situational awareness




Photo Credit: Nicholas Huff



                                                                                16 | 2025 ITTF
           Regional Multi-Modal Mobility Program (RM3P) Northern Virginia Dynamic Incentivization

ITTF PURPOSES                                                                            Overview
                                                                                         Location                 Greater Northern Virginia
                                                                                         VDOT District            Northern Virginia
                                                                                         Route                    Multiple Routes
Description                                                                              City/County              District Wide
                                                                                         Project Cost             $3,500,000
„ This project is part of the larger RM3P initiative, which includes an AI-based
   Decision Support System, a Commuter Parking Information System, and                   2025 Milestones          Program launched in 2025.
   a Data-Exchange Platform.                                                             Delivery Date            Initial launch complete, 1 year evaluation due October 2026
„ Dynamic Incentivization is a data-driven system that incentivizes drivers to
   modify their travel mode choices and behaviors based on real-time travel
   events and conditions impacting mobility in the Northern Virginia area.
„ The incentives will be offered dynamically, when the transportation system             Roadway Characteristics – All of Northern Virginia District
   is congested, to encourage travelers to modify their travel modes and time of         (2024 data)
   travel, thereby reducing the impact of adverse events and benefiting overall          Vehicle Hours of Delay                           11.9M
   transportation network performance for all users.
                                                                                         Vehicle Hours Cost of Delay                      $321M
„ The incentives will be offered through an app called GoMyWayVA™.
                                                                                         Total # Lane Impacting Incidents                 14,386
„ The effort extends the incentivization concepts, used in Northern Virginia
   during major construction projects and as rewards for non-drive alone trips, to       Median Incident Duration                         32 minutes
   responding day-to-day to significant recurring and non-recurring congestion
   events.                                                                               Daily Traffic Volume                             Varies by road

„ The Dynamic Incentivization project is jointly managed by the Virginia                 Benefits
   Department of Transportation and the Department of Rail & Public                      Focus          Metrics                           Anticipated Results
   Transportation.                                                                                                                        Improved travel times with travel
                                                                                                                                          behavior changes, reducing volumes
                                                                                                        Travel Time Index
                                                                                                                                          A 3% - 10% improvement in reliability
                                                                                         Mobility
                                                                                                                                          with all RM3P projects
     Dynamic                     Project Partnering Agencies
                                                                                                        HOT/HOV Lane Use
  Incentivization                                                                                                                         Increase in usage
                                                                                                        Transit Use
                                                                                                        Vehicle Hours of Delay            Reduction in VHD when all RM3P
                                                                                                        (VHD)                             programs are implemented.
                                                                                         Congestion
                                                                                                                                          Changes in volumes during peak periods
                                                                                                        Volume
                                                                                                                                          or events
                                                                                                        # Incentives Used
                                         Regional TDM         Reward                     Travel Data                                      Increased awareness
                                                                                                        # Users
                                           Partners         Contributors



                                                                                 17 | 2025 ITTF
                 FY26 INTRODUCED
                 ITTF PROJECTS
                 This section defines all new ITTF projects using the
                 FY26 allocation.




18 | 2025 ITTF
          Adaptive Signal Control and Detection Upgrades on Route 460B in Christiansburg

ITTF PURPOSES                                                                        Overview
                                                                                                               17 intersections between Farmview Rd and Professional Park Dr in
                                                                                     Location
                                                                                                               Christiansburg
                                                                                     VDOT District             Salem
                                                                                     Route                     US 460 Business
Description
                                                                                     City/County               Christiansburg
„ This project aims to deploy Adaptive Traffic Signal Control, which is currently
                                                                                     Innovative Elements       Advanced Traffic Signal Technologies
   available through the Central Traffic Signal System statewide central traffic
   signal management software initiative. Implementing this system is expected       Project Cost              $1,110,000
   to improve traffic conditions by adapting to unexpected traffic conditions that   Delivery Date             September 2026
   may arise.
„ The deployment includes vehicle detection upgrades at the intersections
   to provide lane-by-lane detection at the stop bar on all approaches
   and advanced detection on the mainline. The corridor identified for the           Roadway Characteristics (2024 data)
   deployment is Route 460/Business in Christiansburg and encompasses 17             Vehicle Hours of Delay (VHD)                    26,000
   intersections.
                                                                                     Vehicle Hours Cost of Delay                     $1.1M
                                                                                     Total Crashes                                   85
                                                                                     Vehicle Miles Traveled                          12M
                                                                                     Travel Time Index                               1.10


                                                                                     Benefits
                                                                                     Focus           Metrics                 Anticipated Results

                                                                                     Safety          Collisions              Reduced number of rear end collisions

                                                                                     Mobility        Travel Time Index       Improved reliability with vehicle detection

                                                                                                     Vehicle Hours
                                                                                     Congestion                              Reduction in VHD
                                                                                                     of Delay (VHD)




                                                                             19 | 2025 ITTF
          Interchange Queue Monitoring System & Traffic-Responsive Control on Route 220 in Roanoke

ITTF PURPOSES                                                                         Overview
                                                                                      Location                  Multiple traffic intersections
                                                                                      VDOT District             Salem
                                                                                      Route                     US 220
Description                                                                           City/County               Roanoke
                                                                                      Innovative Elements       Advanced Traffic Signal Technologies
„ The southern end of the I-581/Route 220 freeway transitions to a
  4-lane signalized arterial in a busy commercial area. The first signal is           Project Cost              $530,000
  approximately 2600 feet from the interchange at Route 419, and the                  Delivery Date             August 2026
  southbound approach commonly backs up to the interchange.
„ This project will install a NavTech radar system that can measure queue
  lengths in the interchange area, and use the existing Central Traffic Signal
  System traffic-responsive functionality to trigger a signal timing plan to clear
  the queue on Route 220.                                                             Roadway Characteristics (2024 data)
                                                                                      Vehicle Hours of Delay                         63,000
                                                                                      Vehicle Hours Cost of Delay                    $2.6M
                                                                                      Total Crashes                                  144
                                                                                      Vehicle Miles Traveled                         77M
                                                                                      Travel Time Index                              1.03


                                                                                      Benefits
                                                                                      Focus           Metrics                 Anticipated Results
                                                                                                                              Reduction in queuing is expected to result in
                                                                                      Safety          Collisions
                                                                                                                              fewer rear-end collisions.
                                                                                                                              Improved reliability is expected due to reduced
                                                                                      Mobility        Travel Time Index
                                                                                                                              queuing.
                                                                                                                              NavTech radar system will continuously
                                                                                                      Vehicle Hours
                                                                                      Congestion                              monitor traffic queues, allowing for necessary
                                                                                                      of Delay (VHD)
                                                                                                                              adjustments to be made to reduce VHD.




                                                                              20 | 2025 ITTF
          Scalable Digital Models with Smart Mobility Integration for the City of Alexandria

ITTF PURPOSES                                                                         Overview
                                                                                      Location                  Multiple intersections in the North Potomac Yard area
                                                                                      VDOT District             Northern Virginia
                                                                                      Route                     Multiple
Description                                                                           City/County               Alexandria
                                                                                      Innovative Elements       Digital Twin
„ This project will create a new, easy-to-use system that brings together data
  from many city sources—like traffic signals, parking, street assets, and            Project Cost              $1,950,000
  environmental sensors—into one connected platform. Using this data, the             Delivery Date             July 2029
  project will build a “digital twin,” a virtual version of the city that can model
  how things work in real time. An advanced large language model will then
  help staff explore the data, test different scenarios, and get useful insights to
  make better decisions about traffic and transportation management.
                                                                                      Roadway Characteristics - City of Alexandria (2024 data)
                                                                                      Vehicle Hours of Delay                         1.2M
                                                                                      Vehicle Hours Cost of Delay                    $50.3M
                                                                                      Total Crashes                                  131
                                                                                      Vehicle Miles Traveled                         720.7M




                                                                                      Benefits
                                                                                      Focus           Metrics              Anticipated Results

                                                                                      Safety          Collisions           Fewer crashes

                                                                                                      Multi-modal
                                                                                      Mobility                             Improved multi-modal throughput
                                                                                                      Throughput
                                                                                                      Vehicle Hours
                                                                                      Congestion                           Reduce VHD
                                                                                                      of Delay (VHD)
                                                                                                      # of Integrated
                                                                                      Travel Data                          Increase travel data sources
                                                                                                      Data Sources




                                                                              21 | 2025 ITTF
          Next Generation Traffic Operations Data Service - Greater Richmond

ITTF PURPOSES                                                                         Overview
                                                                                      Location                  I-95 MM78-MM86
                                                                                      VDOT District             Richmond
                                                                                      Route                     I-95
Description                                                                           City/County               City of Richmond, Henrico County, Hanover County
                                                                                                                Advanced Traffic Management Technologies
„ This project is taking a new approach to deploying innovative technology by         Innovative Elements
                                                                                                                Connected and Automated Vehicles
  providing Data-as-a-Service to VDOT. It will integrate data from new field
  devices and external sources to provide high-fidelity, low-latency data to the      Project Cost              $19,500,000
  Richmond Travel Operations Center (TOC) for more proactive and efficient            Delivery Date             September 2030
  traffic management and incident response. Along with providing data to the
  TOC to aid in decision-making, certain data from the system may be pushed
  directly to third-party applications for driver awareness. The project will also
  prepare the corridor for the future of Connected and Automated Vehicles             Roadway Characteristics (2024 data)
  (CAV) and help VDOT evaluate the solution's viability for other critical
  corridors in the Commonwealth.                                                      Vehicle Hours of Delay                       203K

„ The project will be located on I-95 in Richmond and Henrico County between          Vehicle Hours Cost of Delay                  $8.4M
  mile markers 78 and 86.                                                             Total Crashes                                223
                                                                                      Vehicle Miles Traveled                       359M




                                                                                      Benefits
                                                                                      Focus           Metrics                      Anticipated Results

                                                                                      Safety          Collisions                   Fewer crashes

                                                                                      Mobility        Travel Time Index            Improved reliability

                                                                                                      Vehicle Hours
                                                                                      Congestion                                   Reduction in VHD
                                                                                                      of Delay (VHD)
                                                                                      Emergency       Response Time                Emergency response time is expected to
                                                                                      Response        Clearance Time               improve
                                                                                                                                   Increased data provided to improve
                                                                                      Travel Data     Additional Data Source
                                                                                                                                   situational awareness




                                                                              22 | 2025 ITTF
                 APPENDIX
                 The Appendix contains a list of all active ITTF
                 projects effective August 31, 2025.




23 | 2025 ITTF
                                                                          Appendix


                                                                                                                                Tentative
#     UPC        VDOT District                              Description                            $         Current Phase
                                                                                                                              Delivery Date

1    128154   Salem              Adaptive Signal Control and Detection for Route 460           $1,110,000      Scoping       September 2026

2    128190 Salem                Interchange Queue Monitoring                                   $530,000       Scoping        August 2026

3    T30479 Northern Virginia    Scalable Digital Models                                       $1,950,000      Scoping         July 2029

                                 Next Generation Traffic Operations Data Service – Greater
4    127235 Richmond                                                                           $19,500,000     Scoping       September 2030
                                 Richmond
                                 Staunton & Salem Traffic Operation System Advanced Corridor
5    125726   Staunton                                                                         $1,000,000      Scoping        October 2026
                                 Monitoring

6    126014   Lynchburg          Districtwide Signal Data Collection                            $735,000       Scoping         May 2028

7    126358   Staunton           Fiber: I-81, I-66, Rte 211 & 29                               $1,790,990      Scoping       December 2027

8    126702   Fredericksburg     Fiber: Route 17                                               $2,235,480      Scoping         May 2027

9    126703   Fredericksburg     Fiber: I-95                                                   $1,371,710      Scoping        October 2026

10   127090   Statewide          Traffic Operations Management System Enhancement              $1,000,000      Scoping         May 2026

11   127902   Staunton           Ramp Speed Warning Systems                                    $2,000,000      Scoping       November 2026

12   125374   Richmond           Red Light Extension on High Speed/Volume Truck Routes          $500,000       Scoping        August 2027

                                                                                                               Scoping -
13   121564   Statewide          Leveraging Connected Car Data for Improved Safety              $500,000                     December 2025
                                                                                                                Study
                                 Northern Virginia/Fredericksburg Cooperative Freeway                          Scoping -
14   121653   Statewide                                                                        $3,000,000                     August 2026
                                 Management (Connected Vehicles)                                                Study
                                                                                                               Scoping -
15   121670   Statewide          Advanced Road Weather Information System Study                 $500,000                      August 2026
                                                                                                                Study



                                                                       24 | 2025 ITTF
                                                                          Appendix


                                                                                                                               Tentative
#     UPC        VDOT District                                  Description                       $         Current Phase
                                                                                                                             Delivery Date
                                                                                                              Scoping -
16   127004   Statewide           Statewide Sidewalk and Crosswalk Management Tool             $350,000                       July 2028
                                                                                                               Study

17   107058   Hampton Roads       Newport News Citywide Signal Retiming                       $1,910,000       Design       November 2026

18   119199   Statewide           Smarter Lighting Initiative                                  $500,000        Design       December 2025

19   119332   Statewide           Data Drive Management Program for Pavement                   $370,000        Design       November 2025

20   121643   Statewide           Smart Intersection Deployment Support                       $1,000,000       Design         May 2026

21   121648   Culpeper            Advanced Interchange Lighting at Exit 99 Afton Mtn          $2,888,000       Design         July 2028

22   121698   Northern Virginia   Dynamic Ramp Metering for I-66 & I-395                      $1,100,000       Design       November 2026

                                  Hard Shoulder Running Technology Implementation for State
23   122147   Richmond                                                                        $31,561,735      Design        March 2028
                                  Route 288

24   122904   Statewide           Connected Work Zones                                         $700,000        Design       December 2026

25   125030   Hampton Roads       I-664 / Bridge Road Integrated Corridor Management          $4,840,000       Design         May 2027

26   125206   Bristol             Big Walker Mountain Tunnel Hazmat Placard Reader             $875,000        Design         July 2028

27   125207   Bristol             Traffic Queue Detection - I-81/I-77 Corridor                $1,853,680       Design         July 2028

28   125208   Bristol             Big Walker Mountain Tunnel Tube Thermal Detection            $954,100        Design         July 2028

29   125376   Richmond            Install Ramp Pre-emption Systems                             $748,899        Design        August 2027

30   126100   Bristol             Big Walker Mountain Tunnel Work Zone Management             $3,004,335       Design         July 2028



                                                                       25 | 2025 ITTF
                                                                          Appendix


                                                                                                                                 Tentative
#     UPC        VDOT District                              Description                             $         Current Phase
                                                                                                                               Delivery Date

31   126226   Hampton Roads       Fiber: Route 17 Coleman Bridge                               $6,410,590        Design       December 2026

                                  Hampton Roads Bridge Tunnel Over-Height Technology -
32   126241   Hampton Roads                                                                    $3,996,742        Design         June 2027
                                  Systems Integration
33   126282   Bristol             Fiber: Point Broadband Coal Loop                             $1,547,406        Design         June 2026

34   126297   Richmond            Fiber: I-295                                                  $920,300         Design         May 2026

35   126357   Staunton            Fiber: I-81 North Gap                                        $7,882,490        Design       December 2027

36   126454   Salem               Portable ITS Cameras for Incident Monitoring                  $100,000         Design       December 2025

37   126589   Lynchburg           Fiber: Districtwide                                           $934,000         Design         June 2028

38   126758   Culpeper            Fiber: Route 29 & 229                                         $266,585         Design       October 2027

                                  Active Traffic Management System Enhancements (Releases 1, 2,                Installation
39   111892   Statewide                                                                         $12,223,789                     May 2026
                                  3, & 4)                                                                      (Release 4)

40   115832   Northern Virginia   Performance Parking Deployment in Commercial Corridors       $5,593,494      Installation   December 2025

41   115854   Statewide           Arterial Operations Program Management Dashboard             $1,250,000      Installation   November 2025

42   115855   Statewide           High Speed Communications Design Arterials - Statewide        $788,851       Installation   January 2026

43   116811   Statewide           High Speed Communications Arterials - Southwest               $307,775       Installation   December 2025

44   119406   Statewide           Automated Speed Enforcement Project                          $1,500,000      Installation     June 2026

45   119408   Lynchburg           High-Water Monitoring System - Lynchburg                      $670,000       Installation     July 2026




                                                                     26 | 2025 ITTF
                                                                          Appendix


                                                                                                                                    Tentative
#     UPC        VDOT District                              Description                                 $        Current Phase
                                                                                                                                  Delivery Date
                                  Regional Multi-Modal Mobility Program - Decision Support
46   119720   Statewide                                                                             $8,390,000    Installation   November 2027
                                  System & AI Tool

47   119721   Statewide           Regional Multi-Modal Mobility Program - Dynamic Incentivization   $3,500,000    Installation   September 2026

                                  Regional Multi-Modal Mobility Program - Commuter Parking
48   120369   Statewide                                                                             $4,800,000    Installation   November 2027
                                  Information System

49   121654   Statewide           Advanced Traffic Operations Support Center                        $1,000,000    Installation    March 2026

                                  Regional Multi-Modal Mobility Program - Supporting Data
50   121667   Statewide                                                                             $5,000,000    Installation   September 2028
                                  Services
                                  Real Time Information Dissemination for Commercial Motor
51   121668   Statewide                                                                             $1,000,000    Installation     June 2026
                                  Vehicles
                                  Automated Traffic Signal Performance Measures - Technical
52   121775   Lynchburg                                                                             $708,621      Installation   December 2025
                                  Upgrades and Enhancements
                                  Hampton Roads Bridge Tunnel Over-Height Technology - Civil
53   122764   Hampton Roads                                                                         $9,000,000    Installation     July 2026
                                  Work

54   125029   Hampton Roads       Hampton Roads Signal Preemption                                   $161,000      Installation   December 2025

                                  Regional Multi-Modal Mobility Program - Management and
55   125123   Statewide                                                                             $4,000,000    Installation   December 2027
                                  Integration
                                  Automated Traffic Signal Performance Measures - Culpeper
56   125829   Culpeper                                                                              $873,000      Installation   November 2026
                                  District US 29, US 250, VA 3
                                  Automated Traffic Signal Performance Measures - Lynchburg
57   126015   Lynchburg                                                                             $1,010,528    Installation   November 2025
                                  District

58   126208   Hampton Roads       Fiber: Williamsburg Route 603 & Route 60                          $600,127      Installation   November 2025


59   126225   Bristol             Animal Detection and Driving Warning System on Corridor Q         $640,001      Installation    October 2026


60   126278   Northern Virginia   Fiber: US 29 Gainsville                                           $270,021      Installation   February 2026



                                                                    27 | 2025 ITTF
                                                                           Appendix


                                                                                                                      Tentative
#     UPC       VDOT District                                Description                  $        Current Phase
                                                                                                                    Delivery Date

61   126405   Northern Virginia   Fiber: Node 9 to Node 12                            $1,299,300    Installation   December 2026

62   126760   Northern Virginia   Traffic Signal Controller and CPU Enhancements      $2,000,000    Installation    March 2026

63   126987   Fredericksburg      Fiber: Route 29 & 229                               $209,988      Installation   November 2025


64   126988   Fredericksburg      Fiber: Route 3                                       $58,522      Installation   November 2025




                                                                    28 | 2025 ITTF
Innovation
 Innovation and
            and Technology
 Transportation Fund
Transportation  Fund (ITTF)
                     (ITTF)
Report to
       to the
          the General
              GeneralAssembly
                      Assemby
                     2025
                    2024


File and source

File
2026-RD82.pdf
Size
19,526,292 bytes
SHA-256
aaa4b58e287cfbf92f0bb3349b176eb87a901ec54add9551aff49ea79850b897
Our copy
2026-RD82.pdf
Original
No public link identified.
Back to top