Summary

The 2024 Annual Report for Virginia Telecommunication Initiative and Broadband Equity, Access, and Deployment Program funded projects, submitted by the Department of Housing and Community Development in December 2024 and required by § 56-466.1 of the Code of Virginia. The executive summary states that VATI FY22, FY23, and FY24 projects will provide access to broadband infrastructure to 334,873 passings across Virginia, with $828.4 million in state and federal funding awarded and $1.228 billion in private and local match funding leveraged. It states that 32 out of the 61 projects are scheduled to be completed on time and that DHCD identifies 29 projects as at risk. The report ends with project tables, with data as of September 2024 Monthly Project Reports.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Virginia Telecommunication Initiative and Broadband Equity, Access, and Deployment Program: 2024 Report.” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2025-rd76-46a48aae39/, SHA-256 7fa60b6fa3245a61e203c7e4e5737e94377aa1ca1b9ea752e47a0ff7f28d7152.

Full text

Annual Report for Virginia
Telecommunication Initiative and Broadband
Equity, Access, and Deployment Program
Funded Projects
Required by §56-466.1 of the Code of Virginia

2024 Report




Submitted by:
The Department of Housing and Community Development
December 2024
                                                 Executive Summary

          Virginia funds broadband deployment within the Commonwealth through several programs.
    The largest and main program is the Virginia Telecommunication Initiative (VATI). The upcoming
    Broadband Equity, Access, and Deployment Program (BEAD) will finish the job of attaining universal
    connectivity in the Commonwealth. The Virginia Department of Housing and Community
    Development (DHCD) anticipated BEAD funding will be awarded in Summer 2025, with projects
    beginning in 2026 for the last ~131,000 passings in the Commonwealth without broadband and
    without a funded solution for connectivity.

           VATI provides grants to localities partnered with internet service providers to finance the
    deployment of high-speed broadband to locations (called a “passing”) within the Commonwealth
    that are determined to be “unserved.” Passings are places where the internet can be accessed – thus
    it could be a business, community anchor, a home, or an apartment complex. A passing is
    unserved1 if it lacks access to internet speeds of 100 Megabits per second (Mbps) download and
    20 Megabits (Mbps) upload (“100/20”). BEAD has a similar eligibility structure, with locations
    lacking 100/20 eligible for funding under the program.

           This report is required by statute and has been prepared by the Office of Broadband located
    within DHCD. This report tracks the technical performance of the VATI provider partners in
    their work to deploy broadband. This report adheres to the factors that the General Assembly
    directed to be tracked and presents them in the manner directed by the General Assembly.

          Below are the key takeaways from the report:

            ● Total passings: VATI FY22, FY23, and FY24 projects will provide access to
              broadband infrastructure to 334,873 passings across Virginia.
            ● Leveraged local and private funding: In addition to $828.4 million in state and federal
              funding awarded, FY22, FY23, and FY24 projects leverage a total of $1.228 billion in
              private and local match funding. To-date, $237 million of these awarded funds have
              been expended, with $297.7 million of these matching funds have been expended.
            ● Locations Built-To: To date, FY22 and FY23 projects have provided broadband access
              to 106,000 locations. The 10 FY24 projects are getting under contract and will begin
              final engineering and design, as well as construction in late 2024 through early 2025.
            ● Maximum Speeds Available: Over 93.4% of projects funded in FY22, FY23, and FY24
              offer functionally gigabit (1,000 Mbps) download speeds, and over 73.7% offer
              functionally gigabit upload speeds.

          In conclusion, 32 out of the 61 projects funded from the American Rescue Plan Act of 2021
    (ARPA) and General Funds from FY22, FY23, and FY24 are scheduled to being completed on
    time as of the time of this report’s submission. 29 projects, DHCD identifies, are at risk for
    incompletion or underperformance. Justification for these delays include the make-ready effort,
    which includes preparing existing electric poles for aerial broadband network construction, as well
    as supply chain and labor markets, streamlining utility locate efforts, railroad crossings, the
    permitting process to lay fiber in state-owned rights of way along roads, and permitting to cross
    federally owned lands. Looking forward, DHCD will continue its ongoing work to monitor these


1
  In the FY22 VATI process, the definition of unserved was set at 25/3. This definition of unserved has been upgraded to
those passings lacking access to broadband at speeds of 100/20 for the FY23 VATI process.
projects, assisting where appropriate in mitigating these broadband deployment challenges.

                                             Formal Report

        Pursuant to Section § 56-466.1 of the Code of Virginia, enclosed is the Annual Report
  of the Virginia Telecommunication Initiative (VATI) and the federal Broadband Equity,
  Access, and Deployment (BEAD) Program in the Commonwealth.

        Section § 56-466.1 of the Code of Virginia requires that DHCD deliver an annual report
  on funds awarded through the Virginia Telecommunication Initiative (VATI) and the federal
  Broadband Equity, Access, and Deployment (BEAD) Program in the Commonwealth.
         Administered by the Virginia Department of Housing and Community Development
  (DHCD), VATI enhances the sustainability and growth of communities throughout the
  Commonwealth by preparing those communities to build, utilize, and capitalize on broadband
  infrastructure. The primary objective of VATI is to provide financial assistance to supplement
  construction costs by private sector broadband service providers to extend service to areas that
  presently are unserved by any broadband provider. This program requires a public-private
  partnership. The BEAD Program’s application process is currently underway. DHCD expects
  awards to be announced under BEAD in Summer 2025, with projects beginning in early 2026.

        The directive to form this report establishes that:
                2. That in administrating the Virginia Telecommunication Initiative (VATI) and
         the federal Broadband Equity, Access, and Deployment (BEAD) Program in the
         Commonwealth, the Department of Housing and Community Development is directed
         to submit annually on or before December 1 of 2024 through 2028 a report to the
         Governor, the General Assembly, and the State Corporation Commission on the
         progress of broadband expansion projects across the Commonwealth funded through
         VATI and BEAD. Such report shall assess (i) the fiber mileage constructed, (ii) the
         locations passed, (iii) the timelines for remaining contracted projects, (iv) the amount
         of grant funding expended, and (v) the number of projects extended and the rationale
         for such extensions.
        Project information displayed in this report reflects monthly report data from
  September 2024, which reflects project data as of the end of August 2024.
        In regards to extended projects, out of the 61 VATI projects funded in FY22, FY23, and
  FY24, 29 have requested and received timeline extensions. DHCD staff continue to closely
  monitor the impact of challenges impacting project timelines. DHCD has recently provided
  supplemental funding to eligible projects under the Virginia Make Ready Initiative, which is
  designed to mitigate the impacts of elevated make-ready costs. DHCD is closely monitoring
  the impact of this program on accelerating delivery of the awarded projects.
        Other deployment challenges which are being monitored by DHCD include supply
  chain and labor markets, streamlining utility locate efforts, railroad crossings, the permitting
  process to lay fiber in state-owned rights of way along roads, and permitting to cross federally
  owned lands. DHCD and its local government and internet service provider partners are
  continuing to develop innovative solutions to meet these challenges and deliver high-speed
  broadband access as quickly as possible for residents in these project areas.
     The project summaries included in this report are updated quarterly on the VATI Project
Dashboard, accessible through dhcd.virginia.gov/vati.
                                                                                                                 Percent
                                                                                                               Complete,                                                                                                    Award Funding Source
                                                                                              Total Passings                                                                         Days
                                                                                                                Passings                                                                                                      GF, General Fund                                            Percent Expended, Out
                                                                                                Provided                     Miles of Fiber                                       Remaining in
                                                                        Passings in Project                     Provided                                                                                           SLFRF, Coronavirus State and Local Fiscal                                of Total Awarded
                                                                                               Broadband                    Complete to Date                        Agreement End Agreement                                                                    Awarded Funding Expended
             Grantee                  Internet Service Provider Partner        Area                            Broadband                       Agreement Start Date
                                                                                                                                                                                 from 12.1.2024   Award Amount                 Recovery Fund                                                     Funding
                                                                                              Access to Date                                                             Date
                                                                                                                Access to                                                                                            CPF, Coronavirus Capital Projects Fund
                                                                                                                  Date
             Bedford                                 ZiTEL                     5,644              4,114            73%           379.91             06/15/2022        3/15/2025                   $11,480,664.98                   GF, SLFRF                         $6,217,592.17                 54%
                                                                                                                                                                                      104.00
             Bedford                               Shentel                     3,204              1,239           39%            137.18             09/09/2022        3/15/2025                    $6,191,796.33                   GF, SLFRF                          $375,607.14                  6%
                                                                                                                                                                                      104.00
             Botetourt                         Lumos Networks                  1,901              1,193           63%            250.81             11/01/2022        12/31/2024                   $3,084,796.00                      CPF                            $1,285,150.16                 42%
                                                                                                                                                                                      30.00
             Campbell                              Shentel                     3,509              1,050           30%            99.67              09/21/2022        12/31/2024                   $6,443,000.00                   GF, SLFRF                          $77,468.58                   1%
                                                                                                                                                                                      30.00
     Central Shenandoah PDC                         MGW                        2,470              1,026           42%            63.97              06/01/2022         6/1/2025                    $7,876,800.00                     SLFRF                           $2,908,225.71                 37%
                                                                                                                                                                                      182.00
            Chesapeake                               Cox                        279                315            100%           14.41              06/01/2022        3/31/2024                    $580,435.00                       SLFRF                            $570,435.00                  98%
                                                                                                                                                                                    Complete
        Commonwealth RC                              Kinex                    11,397              7,334           62%             718               06/14/2022        6/14/2026                   $15,000,000.00                      GF                             $9,922,095.03                 66%
                                                                                                                                                                                      560.00
             Culpeper                        All Points Broadband              4,269                0              0%            42.35              08/03/2022        2/28/2025                    $8,600,000.00                      GF                             $2,804,691.76                 33%
                                                                                                                                                                                      89.00
     Cumberland Plateau PDC                    Point Broadband                 6,982              4,359           62%            288.54             09/06/2022         9/6/2025                   $23,478,429.00                      CPF                            $5,889,734.30                 25%
                                                                                                                                                                                      279.00
  West Piedmont PDC - Dinwiddie                   RuralBand                     417                 0              0%             13.7              07/03/2022        12/31/2026                   $638,718.00                       SLFRF                                $0                       0%
                                                                                                                                                                                      760.00
                                                                                                                                  712
  West Piedmont PDC - Dinwiddie             RiverStreet Networks               5,009                0              0%                               06/20/2022        6/20/2025                    $6,893,337.00                     SLFRF                                $0                       0%
                                                                                                                                                                                      201.00
                                                                                                                                  314
                                           Eastern Shore of Virginia
Eastern Shore of Virginia Broadband                                                               9,330                                             06/01/2022        12/31/2024                                                                                     $7,329,784.96                 60%
                                             Broadband Authority
             Authority                                                        11,091                              84%                                                                 30.00       $12,310,777.25                     SLFRF

               Floyd                               Citizens                     723                765            100%            103               06/01/2022        6/30/2024                    $1,310,267.00                     SLFRF                           $1,179,240.30                 90%
                                                                                                                                                                                    Complete
              Franklin                             Shentel                     3,508              1,178           34%            154.81             10/17/2022        10/17/2025                  $11,832,456.00                   GF, SLFRF                          $746,783.09                  6%
                                                                                                                                                                                      320.00
                                           Charter Communications                                 2,368                           254               07/08/2022        07/08/2025                                                                                     $6,217,729.01                 29%
       Hampton Roads PDC                                                      12,223                              19%                                                                 219.00      $21,120,053.50                     SLFRF
           Hanover                           All Points Broadband              6,198                0             0%             53.59              08/01/2022        12/31/2025                  $13,970,000.00                     SLFRF                           $3,631,562.45                 26%
                                                                                                                                                                                      395.00
           King William                      All Points Broadband              2,236                0              0%              97               08/03/2022        3/31/2025                    $5,400,000.00                     SLFRF                           $1,577,320.47                 29%
                                                                                                                                                                                      120.00
                                                                                                                                 394.57
                                           Scott County Telephone
                                                                                                  4,877                                             06/13/2022        12/13/2024                                                                                     $10,065,435.07                45%
                                                 Cooperative
         LENOWISCO PDC                                                        10,982                              44%                                                                 12.00       $22,190,500.00                  SLFRF, CPF

             Loudoun                         All Points Broadband              8,629                0              0%              85               07/01/2022        10/31/2025                  $17,524,000.00                     SLFRF                           $4,003,000.96                 23%
                                                                                                                                                                                      334.00
            Middlesex                        All Points Broadband               970                 0              0%             70.1              07/22/2022        1/31/2025                    $2,050,000.00                     SLFRF                            $653,676.38                  32%
                                                                                                                                                                                      61.00
        Mount Rogers PDC                       Point Broadband                27,450              26,390          96%           1652.53             06/01/2022        5/31/2025                   $65,883,228.00                      CPF                            $45,203,185.88                695
                                                                                                                                                                                      181.00
                                                                                                                                  206
   New River Valley Regional
                                                                                                   200                                              03/13/2023        3/13/2026                                                                                      $3,452,307.84                 9%
Commission Bland and Montgomery
                                                  Gigabeam                    12,094                               2%                                                                 467.00      $39,233,355.00                      CPF
    New River Valley Regional
                                                                                                    0                              0                12/06/2022        12/06/2024                                                                                      $35,531.25                  0.12%
      Commission Pulaski                     All Points Broadband              7,872                               0%                                                                  5.00       $29,122,000.00                      CPF

        Northern Neck PDC                    All Points Broadband              3,411              2,234           65%            210.8              09/22/2022        3/31/2025                    $3,190,500.00                     SLFRF                           $1,009,110.94                 32%
                                                                                                                                                                                      120.00
  Northern Shenandoah Valley RC              All Points Broadband             41,690                0              0%             55.2              07/22/2022        7/22/2025                   $96,873,500.00                     SLFRF                           $2,3828,164.28                25%
                                                                                                                                                                                      233.00
             Roanoke                           CBEC-Bee Online                  495                501            100%                              09/09/2022         6/1/2024                    $1,581,584.00                     SLFRF                           $1,571,584.00                 99%
                                                                                                                                                                                    Complete
             Roanoke                                 Cox                        396                249            63%            31.09              09/01/2022        4/15/2025                    $1,535,264.00                     SLFRF                                $0                       0%
                                                                                                                                                                                      135.00
             Roanoke                                 B2X                        520                180            35%           wireless            09/22/2022        5/24/2025       174.00       $170,609.00                        GF                              $35,295.43                   21%
             Roanoke                               Shentel                      177                 0              0%              0                10/03/2022        5/30/2025                    $490,000.00                       SLFRF                                $0                       0%
                                                                                                                                                                                      180.00
           Shenandoah                              Shentel                     4,139              1,605           39%            230.20             08/01/2022         8/1/2025                   $12,176,662.00                     SLFRF                           $4,977,448.05                 41%
                                                                                                                                                                                      243.00

          Southside PDC                     EMPOWER Broadband                 14,634              11,864           81%            668               07/22/2022        07/22/2025                  $69,431,635.00                     SLFRF                           $31,457,093.67                45%
                                                                                                                                                                                      233.00
             Stafford                              Comcast                     634                 682            100%             68               09/06/2022         9/6/2024                    $3,398,156.00                     SLFRF                           $3,058,340.05                 90%
                                                                                                                                                                                    Complete
              Sussex                              RuralBand                    2,267              1,044           46%            78.38              06/13/2022        12/13/2025                   $4,896,892.00                     SLFRF                           $1,625,776.83                 33%
                                                                                                                                                                                      377.00
       Thomas Jefferson PDC                   Firefly Broadband               36,225              13,949          39%            1,753              08/15/2022        08/15/2025                  $79,027,930.00                     SLFRF                           $35,191,537.59                45%
                                                                                                                                                                                      257.00
                                           Charter Communications                                  434                           74,13              08/01/2022        08/01/2025                                                                                      $187,146.52                  13%
        West Piedmont PDC                                                       690                               63%                                                                 243.00       $1,557,385.00                      CPF

    West Piedmont PDC (East)                RiverStreet Networks              24,641              3,878           16%             712               08/03/2022        08/03/2025                  $87,003,888.00                     SLFRF                           $16,315,896.72                19%
                                                                                                                                                                                      245.00

    West Piedmont PDC (West)                RiverStreet Networks              10,056                0              0%            31.99              09/30/2022        02/24/2026                  $33,571,073.00                      CPF                             $515,300.35                  2%
                                                                                                                                                                                      450.00
                                                 Annual Report required by § 56-466.1 of the Code of Virginia for Virginia Telecommunication Initiative and Broadband Equity, Access, and Deployment Program Funded Projects – FY2023 VATI Projects
                                                                                                                Percent
                                                                                                              Complete,                                                                                                                                   Award Funding Source
                                                                                             Total Passings                                                                         Days
                                                                                                               Passings                                                                                                                                     GF, General Fund                                            Percent Expended, Out
                                                                                               Provided                     Miles of Fiber                                       Remaining in                Reason for a
                                                                     Passings in Project                       Provided                                                                                                                          SLFRF, Coronavirus State and Local Fiscal                                of Total Awarded
                                                                                              Broadband                    Complete to Date                        Agreement End Agreement                  Project’s Delay                                                                  Awarded Funding Expended
           Grantee                 Internet Service Provider Partner        Area                              Broadband                       Agreement Start Date
                                                                                                                                                                                    from         Risk                           Award Amount                 Recovery Fund                                                     Funding
                                                                                             Access to Date                                                             Date
                                                                                                               Access to                                                          12.1.2024                                                        CPF, Coronavirus Capital Projects Fund
                                                                                                                 Date
        Bedford County                          Shentel                        565                 0              0%             1.88              4/1/2024          9/1/2025                   No Risk          None            $1,373,161.74                      GF                                  $0                       0%
                                                                                                                                                                                    274.00
        Caroline County                        Breezeline                     3,910                89             8%             57               10/23/2024        10/23/2026                  No Risk          None            $6,446,000.00                      GF                              $333,054.47                  5%
                                                                                                                                                                                    691.00
                                                Verizon                        854                                                                                                                               None                                               GF
                                                                                                  389            45%             61               10/23/2024         4/23/2025                  No Risk                                                                                                 $0                       0%
        Caroline County                                                                                                                                                             143.00                                       $2,032,334.00
                                          All Points Broadband                 494                                                0                12/1/2023        11/30/2026                                   None                                               GF
                                                                                                   0              0%                                                                            No Risk                                                                                                 $0                       0%
      Chesterfield County                                                                                                                                                           729.00                                        $755,523.00
         Essex County                          Breezeline                     3,526                0              0%             10               09/06/2023        09/06/2026                  Low Risk   OTH (Design Delay)    $8,753,009.00                      GF                              $145,382.62                  2%
                                                                                                                                                                                    644.00
         Floyd County                           Citizens                       543                370            68%             49               05/30/2023        02/18/2025                  No Risk          None            $1,339,387.00                      GF                              $343,536.82                  26%
                                                                                                                                                                                     79.00
       Greensville County                       Verizon                       1,347               575            43%            58.52              10/3/2023         4/3/2025                   No Risk          None            $2,956,774.80                      GF                                  $0                       0%
                                                                                                                                                                                    123.00
                                          All Points Broadband                 412                                                0                12/1/2023        11/30/2025                                   None                                               GF
        Henrico County                                                                             0              0%                                                                            No Risk                           $501,620.00                                                           $0                       0%
                                                                                                                                                                                    364.00
        Orange County                          FiberLync                       576                230            40%             39               10/31/2023        04/21/2025                  No Risk          ROW             $2,181,000.00                      GF                                  $0                       0%
                                                                                                                                                                                    141.00
                                                Shentel                       2,440                              48%            67.26              9/26/2023         9/26/2025                                   None                                               GF
      Shenandoah County                                                                          1,164                                                                                          No Risk                          $4,936,968.00                                                     $1,577,743.98                 32%
                                                                                                                                                                                    299.00
                                             EMPOWER Broadband                4,804                                                                                                                              None                                               GF
                                                                                                   40             1%            63.27              9/26/2023         9/26/2026                  No Risk                                                                                               $26,000                   0.3%
        Southside PDC                                                                                                                                                               664.00                                       $8,556,028.84
West Piedmont PDC (Pittsylvania)         RiverStreet Networks                 2,102               162             8%            44.88              10/5/2023         10/5/2026                  No Risk          None            $3,548,250.00                      GF                              $403,927.05                  11%
                                                                                                                                                                                    673.00
   West Piedmont PDC (East)              RiverStreet Networks                 3,356               623            19%            113.36             11/6/2023         11/6/2026                  No Risk          None            $8,155,864.00                      GF                             $1,859,555.68                 23%
                                                                                                                                                                                    705.00
                                                                                                                                                                                                                 None
  West Piedmont PDC (West)               RiverStreet Networks                 4,526                0              0%              0                2/28/2024         2/28/2026                  No Risk                          $8,013,600.00                      GF                                $18,250                   0.23%
                                                                                                                                                                                    454.00
                                   *Data as of September 2024 Monthly Project Reports, which reflect project statistics through the end of August.

                                   Abbreviations for Reasons for Project’s Delay: MR – Make Ready, SCL – Supply Chain and Labor, UL – Utility Locates, RR – Railroad, ROW – Right of Way Permitting along State Roads, FED – Federal Land Permitting Challenges, OTH – Other (Described)




                                                 Annual Report required by § 56-466.1 of the Code of Virginia for Virginia Telecommunication Initiative and Broadband Equity, Access, and Deployment Program Funded Projects – FY2024 VATI Projects
                                                                                                                Percent
                                                                                                              Complete,                                                                                                                                   Award Funding Source
                                                                                             Total Passings                                                                         Days
                                                                                                               Passings                                                                                                                                     GF, General Fund                                            Percent Expended, Out
                                                                                               Provided                     Miles of Fiber                                      Remaining in                 Reason for a
                                                                       Passings in Project                     Provided                                                                                                                          SLFRF, Coronavirus State and Local Fiscal                                of Total Awarded
                                                                                              Broadband                    Complete to Date                        Agreement End Agreement                  Project’s Delay                                                                  Awarded Funding Expended
           Grantee                 Internet Service Provider Partner          Area                            Broadband                       Agreement Start Date
                                                                                                                                                                                    from         Risk                           Award Amount                 Recovery Fund                                                     Funding
                                                                                             Access to Date                                                             Date
                                                                                                               Access to                                                          12.1.2024                                                        CPF, Coronavirus Capital Projects Fund
                                                                                                                 Date
         Giles County                           PemTel                         629                 0               0%             0                   TBD               TBD          N/A        No Risk          None            $4,199,596.00                      GF                                  $0                       0%
        Franklin County                          ZiTEL                        2,543                0               0%             0                   TBD               TBD          N/A        No Risk          None            $4,538,288.00                      GF                                  $0                       0%
                                                                                                                                                                                                                 None
     Thomas Jefferson PDC                        Firefly                      5,825                0              0%              0                   TBD               TBD          N/A        No Risk                         $12,208,500.00                      GF                                  $0                       0%
        Southside PDC                          Empower                        3,983                0              0%              0                   TBD               TBD          N/A        No Risk          None            $3,353,579.00                      GF                                  $0                       0%
      Rockbridge County                       Brightspeed                     1,734                0              0%              0                   TBD               TBD          N/A        No Risk          None             $975,865.00                       GF                                  $0                       0%
      Rockbridge County                           BARC                         293                 0              0%              0                   TBD               TBD          N/A        No Risk          None            $1,197,320.00                      GF                                  $0                       0%
        Orange County                          FiberLync                425               0               0%                 0                 TBD                      TBD          N/A        No Risk          None            $2,138,416.00                      GF                                  $0                       0%
       Alleghany County                          CBEC                   370               0               0%                 0                 TBD                      TBD          N/A        No Risk          None            $2,332,353.00                      GF                                  $0                       0%
       Botetourt County                         Comcast                 62                0               0%                 0                 TBD                      TBD          N/A        No Risk          None             $395,411.00                       GF                                  $0                       0%
                                   *Data as of September 2024 Monthly Project Reports, which reflect project statistics through the end of August.

                                   Abbreviations for Reasons for Project’s Delay: MR – Make Ready, SCL – Supply Chain and Labor, UL – Utility Locates, RR – Railroad, ROW – Right of Way Permitting along State Roads, FED – Federal Land Permitting Challenges, OTH – Other (Described)


File and source

File
2025-RD76.pdf
Size
419,864 bytes
SHA-256
7fa60b6fa3245a61e203c7e4e5737e94377aa1ca1b9ea752e47a0ff7f28d7152
Our copy
2025-RD76.pdf
Original
No public link identified.
Back to top