Quarterly Performance Report of the Virginia Telecommunication Initiative, Q3 FY2025 (April 2025)
Summary
This April 2025 Quarterly Performance Report of the Virginia Telecommunication Initiative (VATI), Q3 FY2025, was submitted by the Department of Housing and Community Development. It states that VATI FY22, FY23, and FY24 projects will provide access to broadband infrastructure to 323,822 passings across Virginia, with $822 million in state and federal funding awarded and a total of $1.211 billion in private and local match funding leveraged. It states that to date projects have provided broadband access to 125,313 locations. It also states that 28 out of the 57 open projects funded from ARPA and General Funds are scheduled to be completed on time and that DHCD identifies 29 projects at risk for incompletion or underperformance.
Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used
Cite this document
“Quarterly Performance Report of the Virginia Telecommunication Initiative, Q3 FY2025 (April 2025).”
Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2025-rd399-c8a7c23b61/
, SHA-256 47e658d9abb9bef52b390879de002254b723a85560c60d6f3d68ac26ec240db2.Full text
1
Quarterly Performance Report of the
Virginia Telecommunication Initiative
Q3 FY2025 Report
Submitted by:
The Department of Housing and Community Development
April 2025
2
Executive Summary
Virginia funds broadband deployment within the Commonwealth through several
programs. The largest and main program is the Virginia Telecommunication Initiative
(VATI).
VATI provides grants to localities partnered with internet service providers to
finance the deployment of high-speed broadband to locations (called a “passing”) within
the Commonwealth that are determined to be “unserved.” Passings are places where the
internet can be accessed – thus it could be a business, community anchor, a home, or an
apartment complex. A passing is unserved1 if it lacks access to internet speeds of 100
Megabits per second (Mbps) download and 20 Megabits (Mbps) upload (“100/20”).
This quarterly report is required by statute and has been prepared by the Office of
Broadband located within the Virginia Department of Housing and Community
Development (DHCD). This report tracks the technical performance of the VATI provider
partners in their work to deploy broadband. This report adheres to the factors that the
General Assembly directed to be tracked and presents them in the manner directed by the
General Assembly.
Below are the key takeaways from the report:
● Total passings: VATI FY22, FY23, and FY24 projects will provide access
to broadband infrastructure to 323,822 passings across Virginia.
● Leveraged local and private funding: In addition to $822 million in state and
federal funding awarded, FY22, FY23, and FY24 projects leverage a total of
$1.211 billion in private and local match funding. To-date, $315.3 million of
these awarded funds and $408.6 million of these matching funds have been
expended.
● Locations Built-To: To date, projects have provided broadband access to
125,313 locations.
● Maximum Speeds Available: Over 93.4% of projects funded in FY22, FY23,
and FY24 offer functionally gigabit (1,000 Mbps) download speeds and over
73.7% offer functionally gigabit upload speeds.
In conclusion, 28 out of the 57 open projects funded from the American Rescue Plan
Act of 2021 (ARPA) and General Funds from FY22, FY23, and FY24 are scheduled to
be completed on time as of this report’s submission. DHCD identifies 29 projects are at
risk for incompletion or underperformance. Justification for these delays include the
make-ready effort, which includes preparing existing electric poles for aerial broadband
network construction, as well as supply chain and labor markets, streamlining utility
locate efforts, railroad crossings, the permitting process to lay fiber in state-owned rights
of way along roads, and permitting to cross federally owned lands. Looking forward,
DHCD will continue its ongoing work to monitor these projects, assisting where
appropriate in mitigating these broadband deployment challenges.
1
In the FY22 VATI process, the definition of unserved was set at 25/3. This definition of unserved has been upgraded
to those passings lacking access to broadband at speeds of 100/20 for the FY23 VATI process
3
Formal Report
Pursuant to Chapter 1 of the Virginia Acts of Assembly of Special Session II of 2021
and continued forward in the 2024 Special Session 1 under Chapter 2 of the Virginia Acts of
Assembly, enclosed is the Quarterly Performance Report of the Virginia Telecommunication
Initiative (VATI).
Item 103 L.6. of the 2024 Acts of Assembly Special Session I requires that DHCD deliver
a quarterly performance report on funds awarded through the 2021 Acts of Assembly Special
Session I (also known as the budget bill) of allocated ARPA funds, as well as state general funds
awarded through the Virginia Telecommunication Initiative since the aforementioned FY2022
budget cycle.
Administered by the Virginia Department of Housing and Community Development
(DHCD), VATI enhances the sustainability and growth of communities throughout the
Commonwealth by preparing those communities to build, utilize, and capitalize on broadband
infrastructure. The primary objective of VATI is to provide financial assistance to supplement
construction costs by private sector broadband service providers to extend service to areas that
presently are unserved by any broadband provider. This program requires a public-private
partnership.
The directive to form this quarterly performance report establishes that:
To the extent possible, the quarterly performance report shall contain
information by grant recipient and year on the following metrics: (1) Number of
passings; (2) Grant dollars expended by fund source (State and Local Recovery
Fund, Capital Project Fund, general fund state grants and match); (3) Contract
performance period, and on-time progress towards project delivery; (4)
Maximum advertised project speeds available; and, (5) Achievement of key
project milestones. The quarterly report shall be due within 30 days of the close
of the quarter. The quarterly performance report shall include an evaluation of
any projects under risk of incompletion or underperformance. The department in
providing such risk assessment shall include a reason for the project's delay.
In accordance with this structure, DHCD has provided information in this report of the
projects that were awarded funds since December 2021 and includes the projects announced
in the FY2022, FY2023, and FY2024 cycles, as well as those projects funded under the
Coronavirus State and Local Fiscal Recovery Fund and Coronavirus Capital Projects Funds
allocations under the American Rescue Plan Act of 2021. Project information displayed in this
report reflects monthly report data from March 2025, which utilizes project data as of the end
of February 2025.
Out of the 57 open projects funded in FY22, FY23, and FY24, 29 have requested and
received timeline extensions, and per DHCD’s analysis, 22 are considered to be at low risk
and 7 are considered to be at high risk. DHCD has established risk definitions specific to
funding year. A summary of these definitions provided in the table below. The definition of
risk category varies for the FY2022 funding year, as this funding year contained American
Rescue Plan Act funding, which has a statutory expenditure deadline of December 31, 2026.
4
Year Risk Level Risk Level Definition
The grantee has not requested a timeline extension beyond
FY22 No Risk the originally approved contract end date; and,
Based on the sole determination of the Office of Broadband,
the grantee is not significantly behind the current approved
milestone timeline; and,
The timeline for that project does not have an end date in
2026.
The grantee has requested a timeline extension beyond the
FY22 Low Risk originally approved contract end date; or,
Based on the sole determination of the Office of Broadband,
the grantee is significantly behind the current approved
milestone timeline and has not yet requested a timeline
extension from the original completion date.
The grantee’s contractual end date is in 2026, regardless of
FY22 High Risk that end date reflecting the original contractually established
end date or is a result of an extension.
FY23, FY24 No Risk The grantee has not requested a timeline extension beyond
the originally approved contract end date; and,
Based on the sole determination of the Office of Broadband,
the grantee is not significantly behind the current approved
milestone timeline.
FY23, FY24 Low Risk The grantee has requested a timeline extension beyond the
originally approved contract end date; or,
Based on the sole determination of the Office of Broadband,
the grantee is significantly behind the current approved
milestone timeline and has not yet requested a timeline
extension from the original completion date.
FY23, FY24 High Risk The grantee has requested more than one timeline
extension beyond the originally approved contract end
date.
DHCD staff continue to closely monitor the continued impact of challenges surrounding
make-ready, which includes preparing existing electric poles for aerial broadband network
construction. DHCD has recently funded the first projects under the Virginia Make Ready
Initiative, which is designed to mitigate the impacts of elevated make-ready costs. DHCD is
closely monitoring the impact of this program on accelerating delivery of affected VATI
projects.
Other deployment challenges which are being monitored by DHCD include supply
chain and labor markets, streamlining utility locate efforts, railroad crossings, the permitting
5
process to lay fiber in state-owned rights of way along roads and permitting to cross federally
owned lands. DHCD and its local government and internet service provider partners are
continuing to develop innovative solutions to meet these challenges and deliver high-speed
broadband access as quickly as possible for residents in these project areas.
The project summaries included in this report are updated quarterly on the VATI Project
Dashboard, accessible through dhcd.virginia.gov/vati.
6
Q3 FY2025 Quarterly Performance Report for the Virginia Telecommunication Initiative - FY2022 Projects
Award
Funding
Source - (GF,
General Fund
)(SLFRF,
Coronavirus
State and Maximum
Percent Local Fiscal Advertised
Total Complete Recovery Percent Percent Project
Passings Passings Fund )(CPF, Expended, Expended, Speeds
Internet Provided Provided Coronavirus Out of Out of Available
Service Passings Broadband Broadband Reason for a Capital Awarded Total Total (Download/
Provider in Project Access to Access to Agreement Agreement Project’s Projects Funding Awarded Total Match Match Funding Match Upload
Grantee Partner Area Date Date Start Date End Date Risk Delay Award Amount Fund) Expended Funding Funding Expended Funding Mbps)
Bedford ZiTEL 5,644 5247.00 93% 06/15/2022 3/15/2025 Low Risk OTH $11,480,664.98 GF & SLFRF $10,259,820.24 89.37% $14,518,564.42 $12,138,783.35 83.61% 1000/1000
MR, UL, RR,
Bedford Shentel 3,204 1992.00 62% 09/09/2022 9/31/2025 Low Risk ROW, FED $6,191,796.33 GF & SLFRF $1,874,387.46 30.27% $13,911,783.67 $4,102,613.38 29.49% 1000/1000
Lumos
Botetourt Networks 1,901 1556.00 82% 11/01/2022 6/30/2025 Low Risk MR $3,084,796.00 CPF $1,799,645.84 58.34% $4,824,937.00 $3,648,742.24 75.62% 1000/1000
Campbell Shentel 3,509 2682.00 76% 09/21/2022 9/31/2025 Low Risk MR, UL $6,443,000.00 GF & SLFRF $1,646,567.77 25.56% $12,978,455.00 $3,317,259.26 25.56% 1000/1000
Central
Shenandoah MGW/ Rob MR, ROW,
PDC Huff 2,470 1066.00 43% 6/1/2022 6/1/2025 Low Risk FED, OTH $7,876,800.00 SLFRF $3,452,598.38 43.83% $3,118,706.00 $1,493,986.68 47.90% 1000/50
Commonwe
7359.00 65% GF
alth RC Kinex 11,397 06/14/2022 6/14/2026 High Risk OTH $15,000,000.00 $11,351,145.48 75.67% $13,426,482 $10,327,985.12 76.92% 200/10
All Points
Culpeper Broadband 4,269 1.00 0% 8/3/2022 2/28/2025 Low Risk MR $8,600,000.00 GF $2,804,691.76 32.61% $21,914,454.00 $4,857,176.06 22.16% 1000/1000
Cumberland Point
Plateau PDC Broadband 5,659 5513.00 97% 09/06/2022 9/6/2025 Low Risk MR $23,478,429.00 CPF $13,512,855.21 57.55% $6,459,000.00 $3,717,435.13 57.55% 1000/500
Eastern
Shore of
Virginia
Broadband
Authority ESVBA 11,091 9381.00 85% 6/1/2022 11/30/2024 Low Risk OTH $12,310,777.25 SLFRF $8,236,666.46 67% $3,314,865.50 $1,521,110.98 45.89% 1000/1000
Franklin Shentel 3,508 1444.00 41% 10/17/2022 10/17/2025 Low Risk MR, UL, RR $11,832,456.00 GF & SLFRF $3,484,354.55 29.45% $18,646,520.00 $5,491,314.05 29.45% 1000/1000
Charter
Hampton Communicat Not at
Roads PDC ions 12,223 2336.00 19% 07/08/2022 7/8/2025 Risk None $21,120,053.50 SLFRF $8,860,240.31 41.95% $13,839,523.00 $6,447,629.24 46.59% 1000/500
All Points
Hanover Broadband 6,198 0.00 0% 8/1/2022 12/31/2025 Low Risk MR $13,970,000.00 SLFRF $3,631,562.45 26.00% $41,469,332.00 $6,362,226.54 15.34% 1000/1000
All Points
King William Broadband 2,236 2236.00 100% 8/3/2022 3/31/2025 Low Risk MR $5,400,000.00 SLFRF $1,577,320.47 29.21% $12,330,632.00 $2,156,898.20 17.49% 1000/1000
Scott County
LENOWISCO Telephone
PDC Cooperative 10,982 5126.00 47% 06/13/2022 12/13/2025 Low Risk MR, RR $22,190,500.00 SLFRF & CPF $11,437,003.20 51.54% $6,354,500.00 $3,639,656.02 57.28% 1000/1000
Loudoun All Points
County Broadband 8,629 1.00 0% 7/1/2022 10/31/2025 Low Risk MR $17,524,000.00 SLFRF $4,003,000.96 22.84% $42,376,126.00 $5,448,166.80 12.86% 1000/1000
Middlesex
County All Points
Broadband 970 0.00 0% 7/22/2022 7/31/2025 Low Risk MR $2,050,000.00 SLFRF $653,676.38 31.89% $8,453,887.00 $1,132,991.43 13.40% 1000/1000
Mount Point
Rogers PDC Broadband 27,450 26390.00 96% 06/01/2022 5/31/2025 Low Risk MR $66,203,228.00 CPF $52,772,287.90 79.71% $33,162,600.00 $29,429,753.67 88.74% 1000/500
7
New River
Valley
Regional
Commission Gigabeam 12,094 435.00 4% 03/13/2023 3/13/2026 Low Risk RR $39,233,355.00 CPF $9,597,895.83 24.46% $38,247,340.00 $9,368,535.31 24.49% 1000/1000
New River
Valley
Regional All Points
Commission Broadband 7,872 0.00 0% 12/06/2022 12/31/2025 High Risk MR $29,122,000.00 CPF $5,907,775.39 20.29% $26,103,057.19 $15,021,078.77 57.55% 1000/1000
Northern
Neck PDC All Points
Broadband 3,411 3411.00 100% 9/22/2022 3/31/2025 Low Risk MR $3,190,500.00 SLFRF $2,560,877.10 80.27% $20,477,692.00 $13,338,823.29 65.14% 1000/1000
Northern
Shenandoah
Valley
Regional All Points
Commission Broadband 32,238 0.00 0% 7/22/2022 6/30/2026 High Risk MR $96,873,500.00 SLFRF $23,828,164.28 24.60% $206,243,317.00 $35,823,220.74 17.37% 1000/1000
Roanoke B2X 520 180.00 35% 09/22/2022 5/24/2025 Low Risk SCL, OTH $170,609.00 GF $35,295.43 20.69% $177,572.00 $40,817.85 22.99% 25/4
Roanoke Cox 396 249.00 63% 09/01/2022 4/15/2025 Low Risk FED $1,535,264.00 SLFRF $0.00 0.00% $1,597,927.00 $0.00 0.00% 940/35
Roanoke Shentel 213 0.00 0% 10/03/2022 5/31/2025 High Risk MR, RR $490,000.00 SLFRF $0.00 0.00% $510,000.00 $0.00 0.00% 1000/1000
Shenandoah
County
Public
Schools Shentel 4,139 2830.00 68% 8/1/2022 8/1/2025 Low Risk MR, UL $12,176,662.00 SLFRF $5,888,310.50 48.36% $20,733,235.00 $10,026,042.20 48.36% 1000/1000
Southside EMPOWER
11961.00 82% 07/22/2022 High Risk OTH $69,431,635.00 SLFRF $35,914,177.01 51.73% $84,677,555.00 $43,680,281.90 51.58% 1000/1000
PDC Broadband 14,634 6/22/2026
RR, ROW,
1320.00 58% SLFRF
Sussex RuralBand 2,267 06/13/2022 12/13/2025 Low Risk MR $4,896,892.00 $2,928,694.39 59.81% $1,678,571.00 $1,004,022.67 59.81% 1000/1000
Thomas
Not at
Jefferson Firefly 18190.00 50% 08/15/2022 None $79,027,930.00 SLFRF $47,684,732.55 60.34% $208,969,670.00 $125,722,685.99 60.16% 1000/1000
36,225 Risk
PDC Broadband 8/15/2025
West
Piedmont
108.00 26% 07/03/2022 High Risk RR, ROW $638,718.00 SLFRF $126,029.37 19.73% $50,570.00 $9,884.66 19.55% 1000/1000
PDC - 417
Dinwiddie RuralBand 12/31/2026
West
Piedmont Not at
0.00 0% 06/20/2022 None $6,893,337.00 SLFRF $481,082.96 6.98% $18,974,275.00 $1,156,288.63 6.09% 1000/1000
PDC - RiverStreet 5,009 Risk
Dinwiddie Networks 6/20/2026
West
Not at
Piedmont RiverStreet 5123.00 21% 08/03/2022 None $87,003,888.00 SLFRF $26,090,086.37 29.99% $65,421,341.00 $26,649,116.61 40.73% 1000/1000
24,641 Risk
PDC (East) Networks 8/3/2025
West
Piedmont RiverStreet 0.00 0% 09/30/2022 High Risk ROW, FED $33,571,073.00 CPF $1,566,727.45 4.67% $59,425,085.00 $2,972,993.15 5.00% 1000/1000
10,056
PDC (West) Networks 2/24/2026
West Charter
Piedmont Communicat 676.00 98% 08/01/2022 Low risk FED $1,557,385.00 CPF $216,637.31 13.91% $1,450,145.00 $141,702.52 9.77% 1000/500
690
PDC ions 8/1/2025
*Data as of March 2025 Monthly Project Reports, which reflect project statistics through the end of February.
Abbreviations for Reasons for Project’s Delay: MR – Make Ready, SCL – Supply Chain and Labor, UL – Utility Locates, RR – Railroad, ROW – Right of Way Permitting along State Roads, FED – Federal Land Permitting Challenges, OTH – Other (Described)
8
Q3 FY2025 Quarterly Performance Report for the Virginia Telecommunication Initiative – FY2023 Projects
Award
Funding
Source - (GF,
General
Fund
)(SLFRF,
Coronavirus
State and
Percent Local Fiscal
Total Complete Recovery Maximum
Passings Passings Fund )(CPF, Percent Percent Advertised
Internet Provided Provided Coronavirus Expended, Expended, Project Speeds
Service Broadband Broadband Reason for a Capital Awarded Out of Total Match Out of Total Available
Provider Passings in Access to Access to Agreement Agreement Project’s Award Projects Funding Awarded Total Match Funding Match (Download/
Grantee Partner Project Area Date Date Start Date End Date Risk Delay Amount Fund) Expended Funding Funding Expended Funding Upload Mbps)
Greensville $2,956,774.8 $4,435,162.2
1,347 1336.00 99% 10/3/2023 Not at Risk None GF $0.00 0.00% $0.00 0.00% 940/880
County Verizon 4/3/2025 0 0
Southside EMPOWER $8,556,028.8 $21,677,288.
4,804 982.00 20% 9/26/2023 Not at Risk None GF $73,000.00 0.85% $0.00 0.00% 1000/1000
PDC Broadband 9/26/2026 4 16
West
Piedmont $3,548,250.0 $1,557,302.0
2,102 243.00 12% 10/5/2023 Not at Risk None GF 43.89% $1,856,750 $818,218.12 44.07% 1000/1000
PDC RiverStreet 0 6
(Pittsylvania) Networks 10/5/2026
West
$8,155,864.0 $3,372,165.7 $5,205,136.0 $2,198,659.9
Piedmont RiverStreet 3,356 745.00 22% 11/6/2023 11/6/2026 Not at Risk None GF 41.35% 42.24% 1000/1000
0 6 0 9
PDC (East) Networks
West
$8,013,600.0 $5,386,400.0
Piedmont RiverStreet 4,526 0.00 0% 2/28/2024 2/28/2026 Not at Risk None GF $22,750.00 0.28% $0.00 0.00% 1000/1000
0 0
PDC (West) Networks
$1,373,161.7 $3,204,044.0
Bedford Shentel 565 417.00 74% 4/1/2024 9/1/2025 Not at Risk None 4 GF $0.00 0.00% 5 $0.00 0.00% 1000/1000
Shenandoah
County
Public $4,936,968.0 $2,081,002.7 $9,168,655.0 $3,864,719.3
Schools Shentel 2,440 1562.00 64% 9/26/2023 9/26/2025 Not at Risk None 0 GF 4 42.15% 0 9 42.15% 1000/1000
Caroline $6,446,000.0 $15,247,000. $2,204,070.0
County Breezeline 3,910 107.00 3% 10/23/2024 10/23/2026 Not at Risk MR 0 GF $838,636.58 13.01% 00 4 14.46% 1000/600
Caroline $2,032,334.0 $5,610,501.0
County Verizon 854 815.00 95% 10/23/2024 4/23/2025 Not at Risk None 0 GF $0.00 0.00% 0 $0.00 0.00% 940/880
Chesterfield All Points $12,494,553.
County Broadband 494 0.00 0% 12/1/2023 11/30/2026 Not at Risk None $755,523.00 GF $0.00 0.00% 00 $0.00 0.00% 1000/1000
Henrico All Points $6,027,280.4
County Broadband 412 0.00 0% 12/1/2023 11/30/2025 Not at Risk None $501,620.00 GF $0.00 0.00% 2 $0.00 0.00% 1000/1000
$8,753,009.0 $19,113,941.
Essex County Breezeline 3,526 0.00 0% 09/06/2023 9/6/2026 Not at Risk MR 0 GF $272,971.21 3.12% 00 $662,319.00 3.47% 1000/600
$1,339,387.0
Floyd County Citizens 543 509.00 94% 05/30/2023 8/18/2025 Not at Risk None 0 GF $661,166.91 49.36% $827,173.00 $453,688.91 54.85% 1000/500
Orange $2,181,000.0 $2,155,031.6 $8,391,058.0 $8,242,087.0
County FiberLync 576 405.00 70% 10/31/2023 4/21/2025 Not at Risk None 0 GF 8 98.81% 0 6 98.22% 1000/1000
*Data as of March 2025 Monthly Project Reports, which reflect project statistics through the end of February.
Abbreviations for Reasons for Project’s Delay: MR – Make Ready, SCL – Supply Chain and Labor, UL – Utility Locates, RR – Railroad, ROW – Right of Way Permitting along State Roads, FED – Federal Land Permitting Challenges, OTH – Other (Described)
9
Q3 FY2025 Quarterly Performance Report for the Virginia Telecommunication Initiative – FY2024 Projects
Award
Funding
Source - (GF,
General
Fund
)(SLFRF,
Coronavirus
State and
Percent Local Fiscal
Total Complete Recovery Maximum
Passings Passings Fund )(CPF, Percent Percent Advertised
Internet Provided Provided Coronavirus Expended, Expended, Project Speeds
Service Broadband Broadband Reason for a Capital Awarded Out of Total Match Out of Total Available
Provider Passings in Access to Access to Agreement Agreement Project’s Award Projects Funding Awarded Total Match Funding Match (Download/
Grantee Partner Project Area Date Date Start Date End Date Risk Delay Amount Fund) Expended Funding Funding Expended Funding Upload Mbps)
Thomas
$12,208,500. $36,427,182.
Jefferson Firefly 5,825 126.00 2% 11/1/2024 12/31/2026 Not at Risk None GF $20,910.00 0.17% $0.00 0.00% 1000/1000
00 00
PDC
Southside $3,353,579.0 $3,153,579.0
Empower 3,757 1253.00 33% 11/13/2024 6/30/2027 Not at Risk None GF $26,000.00 0.78% $0.00 0.00% 1000/1000
PDC 0 0
Carroll Pending Pending $10,347,07 $7,694,453.
ZiTEL 2,446 0.00 0% Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000/1000
County Contract Contract 2.00 00
$4,199,596.0 $1,343,604.0
Giles County PemTel 629 0.00 0% 1/21/2025 1/21/2027 Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000/1000
0 0
Franklin $4,538,288.0 $7,737,355.0
ZiTEL 2,543 0.00 0% 1/21/2025 1/21/2026 Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000/1000
County 0 0
Rockbridge $1,197,320.0 $1,653,443.0
BARC 293 0.00 0% 11/4/2024 11/4/2026 Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000/1000
County 0 0
Rockbridge Pending Pending $3,901,517.0
Brightspeed 1,734 0.00 0% Not at Risk None $975,865.00 GF $0.00 0.00% $0.00 0.00% 1000/1000
County contract Contract 0
Alleghany $2,332,353.0 $1,019,580.0
CBEC 370 0.00 0% 11/21/2024 6/13/2026 Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000 / 1000
County 0 0
Orange $2,138,416.0 $3,155,780.0
FiberLync 546 0.00 0% 8/8/2024 8/8/2026 Not at Risk None GF $0.00 0.00% $0.00 0.00% 1000/1000
County 0 0
Botetourt
Comcast 62 0.00 0% 12/12/2024 12/12/2026 Not at Risk None $395,411.00 GF $0.00 0.00% $232,225.00 $0.00 0.00% 1000 / 1000
County
*Data as of March 2025 Monthly Project Reports, which reflect project statistics through the end of February.
Abbreviations for Reasons for Project’s Delay: MR – Make Ready, SCL – Supply Chain and Labor, UL – Utility Locates, RR – Railroad, ROW – Right of Way Permitting along State Roads, FED – Federal Land Permitting Challenges, OTH – Other (Described)
File and source
- File
- 2025-RD399.pdf
- Size
- 286,161 bytes
- SHA-256
- 47e658d9abb9bef52b390879de002254b723a85560c60d6f3d68ac26ec240db2
- Our copy
- 2025-RD399.pdf
- Original
- No public link identified.