Pandemic Darlings The pandemic economy, in original documents
Home Source documents Collaborative Roadmap Phase IV — Integrating Water, Sewer, School, and Port Districts into the GMA Planning Process (December 16, 2025)

Collaborative Roadmap Phase IV — Integrating Water, Sewer, School, and Port Districts into the GMA Planning Process (December 16, 2025)

Issuer
Congressional materials
Document type
Report

Summary

Collaborative Roadmap Phase IV is the Washington State Department of Commerce's final report to the Legislature, dated December 16, 2025, on integrating water, sewer, school, and port districts into the Growth Management Act planning process. It was prepared pursuant to Chapter 376, Laws of 2024 (SB 5950, Sec. 128(34)). The report describes the working groups for Ports, Schools, and Water/Sewer/PUD, a Task Force that met seven times between Nov. 2024 and Nov. 2025, and a consent decision-making process. It lists nine recommendations, including increased comprehensive plan coordination, project permit notifications, coordinated water system plans timing, school district planning and siting, and long-term protection of industrial lands. The report closes with Appendix C, key issues identified by the working groups, such as planning timelines and emergency planning.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Collaborative Roadmap Phase IV — Integrating Water, Sewer, School, and Port Districts into the GMA Planning Process (December 16, 2025).” Original at app.leg.wa.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2025-collaborative-roadmap-phase-iv-legislative-report-final-120a61d3-e313/, SHA-256 52b80ed092c3bd56501b19ced6f4fbb08f5b8133d540dc964322f9c67ccd5c4c.

Full text

Collaborative Roadmap Phase IV: Final
report on integrating water, sewer,
school, and port districts into the GMA
planning process

Pursuant to Chapter 376, Laws of 2024 (SB 5950, Sec. 128(34))




                                                  December 16, 2025

                                                  Report to the Legislature

  GROWTH MANAGEMENT                               Director Joe Nguyễn
Acknowledgments
Washington State Department of Commerce
Mark Barkley, Local Government Division Assistant
Director

Dave Andersen, AICP - Growth Management Services
Senior Managing Director



Kimley-Horn
Clay White, Planning Director
Ines Galmiche, AICP, Urban Planner
Erin O'Kelley, AICP, Urban Planner

Triangle Associates, Inc.
Thomas Christian, Senior Associate
Kim Zamora Delgado, Associate
Pauline Mogilevsky, Associate




Washington State Department of Commerce

1011 Plum St. SE
P.O. Box 42525
Olympia, WA 98504-2525

www.commerce.wa.gov

For people with disabilities, this report is available on
request in other formats. Please call 360-725-4000 with
your request.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS   2
Table of contents
Executive summary .............................................................................................................................................4

Introduction ........................................................................................................................................................5

Developing the recommendations .......................................................................................................................7

Legislative recommendations............................................................................................................................ 10

Appendix A: Draft recommendation sheets ........................................................................................................ 13

Appendix B: Library of statutes and rules ........................................................................................................... 35

Appendix C: Key issues identified by working groups ......................................................................................... 37




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                                                             3
Executive summary
The Collaborative Roadmap is a multi-year research and analysis project led by the Department of Commerce
(Commerce) to make recommendations to update the state's growth policy framework. This framework consists of
state laws that govern/influence the strategies state agencies and local governments use to plan for, implement,
and manage land use policy, permitting and appeals, infrastructure, and environmental protections. This is the final
report of the Collaborative Roadmap, Phase IV and the preliminary report was published earlier this year.

Authorizing legislation
Chapter 376, Laws of 2024 (SB 5950, Sec. 128(34)) requires Commerce to continue the Growth Management
Collaborative Roadmap. Now in its fourth phase, Commerce must:

        [C]onvene a task force to make recommendations on integrating water, sewer, school, and port districts into
        the growth management act planning process. The task force shall build upon the findings, concepts, and
        recommendations in recent reports, including the "collaborative roadmap phase III" report prepared for the
        department in 2023 and the "roadmap to Washington's future" issued by the William D. Ruckelshaus center
        in 2019. The task force must involve diverse perspectives including but not limited to representatives of
        state agencies, cities, counties, special districts, tribal governments, builders, and planning and
        environmental organizations that have experience with local or special purpose district planning processes.
        [Commerce] must provide a preliminary report on the task force's activities and progress by June 30, 2025.
        It is the intent of the Legislature to continue funding the study in the 2025-2027 fiscal biennium, with a final
        report with recommendations due December 1, 2025.

Past reports and studies, which include the Land Use Study Commission (1998), Governor’s Land Use Agenda
(2006), A Road Map to Washington’s Future (Phase I, 2019), Updating Washington’s Growth Policy Framework
(Phase II, 2021), and the Collaborative Roadmap Phase III (Phase III, 2023), provide a foundation for Phase IV of the
Collaborative Roadmap (2025) and new recommendations to enhance planning and coordination for local
governments.

Recommendations
The Task Force's recommendations span over-arching coordination efforts that may apply to all special purpose
districts, cities, and counties, and unique recommendations that may enhance coordination efforts for select
districts or situations that arise in the existing growth policy framework. They include ideas that would both
enhance the existing framework and right-size planning requirements. Recommendations focus on making the
laws and code governing growth and development work better and on providing local governments with tools to
help them address some of our most pressing issues.

The Task Force provided nine recommendations across a broad spectrum of the growth policy framework for the
Legislature to consider. Appendix A contains the full details for all recommendations.

1)   Increased comprehensive plan coordination
2)   Increased countywide planning policy (CPP) coordination
3)   Project permit notifications
4)   Tools and technical resources
5)   Incentivize coordination and coordinated projects
6)   Coordinated water system plans timing
7)   School district planning and siting
8)   Long-term protection of industrial lands
9)   Port and economic development elements


COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                               4
Introduction
Project overview and purpose
The Collaborative Roadmap is a multi-year research and analysis project led by Commerce, as directed by the
Legislature, to make recommendations to update the state's growth policy framework. This framework consists of
state laws that govern/influence the strategies state agencies and local governments use to plan for, implement,
and manage land use policy, permitting and appeals, infrastructure, and environmental protections.

Phase IV focuses on identifying options to increase coordination between jurisdictions and special districts, such
as school districts, ports, and water/sewer/public utility districts (PUD). Special districts provide many of the
facilities and services necessary for cities to implement their vision for the community as adopted in their
comprehensive plan. Special districts also have their own mandates that are affected by the work of cities and
counties. Identifying opportunities to increase coordination between jurisdictions and special districts has been a
consistent theme throughout the previous Roadmap projects.

A Road Map to Washington's Future (2019) included a recommendation to find ways to integrate water and sewer
districts, school districts, and port district planning into the Growth Management Act (GMA). Collaborative
Roadmap Phase IV builds upon previous efforts, providing the working groups and Task Force with the historical
context necessary to make informed decisions. Past reports and studies, which include the Land Use Study
Commission (1998), Governor’s Land Use Agenda (2006), A Road Map to Washington’s Future (Phase I, 2019),
Updating Washington’s Growth Policy Framework (Phase II, 2021), and the Collaborative Roadmap Phase III (Phase
III, 2023), provide a foundation for the Collaborative Roadmap Phase IV (Phase IV: 2025) project.

The Collaborative Roadmap Phase III project built upon this recommendation and emphasized that the process
should focus on:

  Convene a collaborative process(es) with, at a minimum, representatives of state agencies, cities, counties,
  builders, special districts, Tribal governments, and planning and environmental organizations that have
  experience with local and/or special district planning processes.
  Focus on increasing planning between jurisdictions and special districts to better implement utility and capital
  facility planning requirements under the Growth Management Act.
  Focus on methods to help ensure that special districts can more fully incorporate local comprehensive plans as
  they plan for the utilities and capital facilities necessary to accommodate growth during the planning period.
  Focus on identifying legislative changes that will increase coordination during permitting processes that impact
  special districts while limiting new planning requirements.

Commerce created a Collaborative Roadmap webpage to allow for convenient and accessible information sharing.
All project reports will be made available on the project webpage, as well as the project timeline and project
contact information. This report, the recommendations, and recordings or minutes from Task Force meetings
posted to the webpage.

Problem definition
Currently, numerous services are required to implement the growth plans of jurisdictions. Despite this, laws and
processes do not align. Increasing the challenges jurisdictions and special purpose districts face are limited
staffing and time availability, the number of jurisdictions and special purpose districts to coordinate with, and
differing needs between jurisdictions and special purpose districts.

Cities and counties are not alone in providing capital facilities necessary to support growth (population, housing,
and jobs). School districts, port districts, and water/sewer/PUDs are distinct from cities and counties. In many


COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                               5
cases, special districts work under separate state laws and rules and have separate administrative structures that
cross multiple city and county boundaries.

The goal of this project is to find solutions for increasing coordination between jurisdictions and special districts.
This includes looking for opportunities to right-size statutes, rules, and processes to ensure that requirements are
aligned with the capacity and size limitations of both jurisdictions and special purpose districts.

More coordination may help with:

  Better overall planning.
  Increasing understanding between jurisdictions and special purpose districts.
  Providing opportunities to link resources and support to each other, focusing on better outcomes.

To achieve the project goals and directions from the legislature, the project team established a continuous
participation process to engage diverse groups, through working groups and a Task Force, to make
recommendations to the Legislature on ways to better integrate capital facility and utility planning efforts of
outside service providers with GMA requirements. In addition, the project team engaged with Tribes, other
interested parties, legislators, and communities who have been left out of public policy decision-making and who
are unevenly impacted by those decisions.

Project schedule
Over the course of a year, the project achieved numerous goals. Professionals and subject matter experts were
united in working groups to compile issues to address and provide initial concepts for addressing those issues.
Those concepts were presented to the Task Force to workshop into legislative recommendations. The project
schedule below outlines key dates when project reports and recommendations are due. The schedule also provides
a high-level overview of when the project Task Force and working groups will meet. This is critically important as
the Task Force recommendations will be the foundation for future reports.

  September 6, 2024: Collaborative Roadmap, Phase IV, begins.
  November 2024 to November 2025: Task Force and workgroup meetings.
  June 30, 2025: Preliminary report to the Legislature.
  December 1, 2025: Final report to the Legislature.
  June 30, 2026: Develop final outreach tools to support best practices recommendations, and project closeout.

Throughout the process, the Collaborative Roadmap Phase IV webpage maintained project updates and reports.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  6
Developing the recommendations
The engagement strategy primarily focused on the working groups and the Task Force. This method enables the
project to gather specialized feedback and recommendations from various groups, with the goal of fostering
greater collaboration between individual organizations and jurisdictions. The following establishes the process,
which begins with the working groups making recommendations to the Task Force, which provides a final set of
recommendations to the Legislature for consideration.

Figure one: Process to develop Task Force recommendations




Working groups
Working groups for each special purpose district type were organized to identify recommendations around their
unique planning issues. Three separate working groups focused on Ports, Schools, and Water/Sewer/PUD. Each
working group met three times between January and April. Working groups comprised 10-15 members from the
respective special district types and cities/counties, including diverse representatives from across the state.

After adequately defining the problem with the working groups and Task Force, the project team assembled a
library of existing statutes and rules to identify gaps and opportunities in existing legislation, from which to build
the recommendations in this report. See the Library of Statutes and Rules in Appendix B.

Working Group meetings identified the following issues, which are also detailed in Appendix C:

  Timing of public and special district participation in growth management planning.
  Assistance from the State of Washington.
  Integration of school siting during growth management planning.
  Coordination of utility relocation and improvements.
  Protection of transition zoning outside of Ports.
  Planning for a variety of employment types.
  Urban service extensions in rural areas for schools.
  Grant incentives.
  Coordination on emergency planning.
  Planning alignment in the fastest-growing communities.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  7
Task Force
The Task Force is made up of cities, counties, state agencies, special purpose districts (school districts, ports,
water and sewer districts), planners, and community members often excluded or unevenly impacted by unaligned
planning efforts between jurisdictions and special purpose districts. Task Force members are organized below by
interest area, member, and organization:

  Builders: Andrea Smiley, Building Industry Association of Washington
  Cities: Carl Shroeder, Association of Washington Cities
  Counties: Paul Jewell, Washington State Association of Counties
  Environment: Bryce Yadon, Yadon Consulting
  Planning: Robin Proebsting, American Planning Association-WA
  Ports: Eric Ffitch, Washington Public Ports Association
  Public utilities: Travis Nelson, Washington Public Utility Districts Association
  School districts: Jeff Mann, Bethel School District
  State agencies:

   • Dave Andersen, Washington State Department of Commerce
   • Brian Sayrs, Washington State Department of Health

  Water and sewer districts: Kathy Curry, Woodinville Water


The Task Force met seven times between Nov. 2024 and Nov. 2025. The first few meetings involved reviewing
issues discussed with the working groups. Through an iterative process (see Figure two), the project team filtered
the issues and solutions discussed with the Task Force into a series of recommendations, which were reviewed at
five meetings. Between Aug. and Oct. 2025, the Phase IV project team also met with Task Force members
individually to discuss specific recommendations and evaluate their feasibility and potential impacts.

Figure two: Timeline for task force recommendation development




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                              8
Consent decision-making
To support equity, the project team facilitated Task Force meetings using a consent decision-making process. This
process used simple majority rule. It also emphasized the importance of a clear, shared understanding of
proposals and the value of input from all members of the group. Using this method, the Task Force reached
majority consent on nine recommendations.

Both consent and objections were captured, making it clear who expressed support or concerns regarding the
recommendation. As part of the review of the draft recommendations, the project team scheduled follow-up
meetings with Task Force members who objected to recommendations.

Figure three: Consent decision-making process

                               Clarifying               Short                                     Legislative
         Proposal                                                         Consent review
                               questions              resposnes                                     report

• Review updated      • Each Task Force       • All Task Force      • Verbal response of   • Document
 recommendations.      member had an           members provided      consent, object, or    recommendations
                       opportunity to ask      short responses that abstain were            and Task Force
                       clarifying questions    influenced small      captured. Follow-up    member positions.
                       to understand the       changes to the        discussions were
                       proposal.               proposals.            had with each
                                                                     objecting member.


Other engagement efforts
Additional engagement efforts were intended to gather specific feedback from other parties not directly involved
with the project, as well as to showcase the project and garner support.

In Sept. 2025, the project team met with representatives from the following groups to review draft
recommendations. The purpose was to ensure that the recommendations could be widely accepted and
implemented.

  Transportation Improvement Board (TIB)
  Building Industry Association of Washington (BIAW)
  School Districts
  Commerce Dept. of Health (DOH)
  Commerce Community Economic Revitalization Board (CERB)
  Commerce staff for the Small Communities Initiative (SCI)
  Commerce staff for the Public Works Board (PWB)




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                            9
Legislative recommendations
The Legislature charged the Task Force with building upon past work to make recommendations on how to better
integrate and improve coordination between water, sewer, school, and port districts with the growth management
act planning process.

As detailed above, the recommendations stem from the participation of the working groups and the Task Force, in
addition to input from other stakeholders. Each recommendation has undergone significant review and discussion,
and includes the following:

     Summary of the topic
     Summary of the recommendation
     Topic overview and background
     Description of the issue
     Statutes to amend
     Anticipated budget impacts
     Connection to a previous study
     Advantages
     Disadvantages

The Task Force's work as part of this Collaborative Roadmap Phase IV includes nine recommendations across a
broad spectrum of the growth policy framework for the Legislature to consider. Full details of the Task Force's nine
recommendations are available in Appendix A.

1)    Increased comprehensive plan coordination
2)    Increased countywide planning policy (CPP) coordination
3)    Project permit notifications
4)    Tools and technical resources
5)    Incentivize coordination and coordinated projects
6)    Coordinated water system plans timing
7)    School district planning and siting
8)    Long-term protection of industrial lands
9)    Port and economic development elements


Overarching issues
During Task Force deliberations, three overarching issues were apparent, and which crosscut the detailed issue
areas outlined in Appendix C. The Task Force recognizes these issues present both challenges and opportunities
across multiple recommendations and issue areas.

Governance
Local governments and special districts each operate under their own governing bodies, mandates, and long-term
visions. As a result, effective regional coordination requires collaboration and shared decision-making. Both of
which can feel, expressed by many Task Force members, like giving up a degree of organizational autonomy. While
the recommendations aim to strengthen alignment across jurisdictions, they cannot fully resolve the fundamental
question of “who is in charge.” In practice, governance relies as much on relationships and day-to-day interactions
among decision makers as on statutory authority. Any successful approach will therefore depend on sustained
cooperation, trust-building, and a willingness to compromise across organizational boundaries.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                           10
Timing and implementation.
In 2025, local governments are navigating some of the most significant updates to Washington’s planning
framework since the first GMA plans of the early 1990s. Many jurisdictions are already operating at capacity,
managing extensive workloads with limited resources. As the Task Force developed its recommendations,
members consistently emphasized this constraint: the ability of local governments to absorb additional complex
planning requirements is limited. Implementation strategies must therefore account for timing, bandwidth, and the
practical realities facing staff and elected officials.

Organizational capacity differences.
Washington’s cities, counties, and special purpose districts vary widely in size, staffing, and technical capacity. This
diversity is often even more pronounced among special districts, with some water and sewer districts serving
thousands of connections, while others are serving fewer than a dozen. As the Task Force evaluated its
recommendations, a central consideration was how to scale expectations to each organization’s capacity, growth
rate, and service needs. Rapidly growing communities face escalating infrastructure demands, while others focus
primarily on maintaining existing systems. Future laws and policies will need to employ thoughtful applicability
thresholds to ensure that requirements match both the capacity of each organization and scale of its challenges.




Other identified opportunities without recommendations
The Task Force identified additional barriers to coordination, but related solutions and formal recommendations
could not be incorporated at this time. Chiefly, commercial and industrial land capacity likely plays a critical role in
future collaboration discussions.

Commercial and industrial land capacity
The GMA focuses on growth (people and jobs) within existing urban growth areas (UGAs). As urbanization occurs,
there may be a need to provide more detailed planning around housing and jobs, and the connection between the
two. Recent housing element changes (RCW 36.70A.070) have focused the lens on planning for housing types that
are affordable to all incomes.

This level of detailed planning could also be important for employment. Given the limited amount of industrial land
available, it may be important to ensure that the employment capacity provided as part of the periodic update
considers the land needed for commercial and industrial uses during the 20-year planning period.

As part of the Buildable Lands requirements, King, Pierce, Snohomish, Kitsap, Thurston, Clark, and Whatcom
counties and the cities within those counties are already required to consider these issues. However, there appears
to be a gap in planning.

The Buildable Lands Program looks back to determine how growth is occurring in relation to what was adopted in
the current comprehensive plan. As part of that process, a determination is made as to the amount of land needed
for commercial, industrial, and housing for the remaining portion of the 20-year planning period. However, there is
no requirement as part of the periodic update process to establish growth projections by employment type, which a
Buildable Lands report would measure against.

The GMA (RCW 36.70A.115) does require accommodating “as appropriate, the medical, governmental, educational,
institutional, commercial, and industrial facilities related to such growth, as adopted in the applicable countywide
planning policies and consistent with the twenty-year population forecast from the office of financial management."




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                11
However, nothing in the GMA outlines the process to determine what is appropriate. The potential to sync the
current Buildable Lands requirements with the larger periodic update process would address the needs for different
types of employment proactively, but the Task Force did not have a consensus view on how to achieve that.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                        12
Appendix A: Task Force recommendations
Each recommendation summary that follows will provide key details to inform it, including proposed statutory
amendments, where appropriate. For accessibility reasons, each recommendation that provides a potential
statutory amendment is available online and linked within the recommendation summary of each recommendation
table. A list of all proposed statutory amendments for this report is also available online.


Recommendation 1 – Increased comprehensive plan
coordination
                         Modify notification requirements for comprehensive plan and development regulation changes
                         to increase coordination and communication between cities, counties, and capital facility and
Topic                    utility providers.
                         The Legislature should amend the GMA public participation notification requirements (RCW
                         36.70A.035). Specific language should be included to ensure special districts, which provide
                         capital facilities and utilities to cities and counties, are invited to engage throughout the periodic
Recommendation           comprehensive plan update process and when land use, zoning, or development regulations are
                         proposed within their service area. Public participation plans should also address how cities and
and link to              counties will communicate throughout the update process.
proposed       Public participation plan requirements (RCW 36.70A.140) should also be amended to reference
statutory      the requirements of RCW 36.70A.035 and requirements in RCW 36.70A.110(1), (9)(a) and (b),
               which require meaningful consultation with federally recognized Indian tribes for Urban Growth
amendments     Area (UGA) swaps under RCW 36.70A.110(8).

                         Proposed legislative changes for Recommendation 1
                         Consent – Brian Sayrs, Paul Jewell, Andrea Smiley, Bryce Yadon, Robin Proebsting, Travis
                         Nelson, Kathy Curry, Eric Ffitch, Dave Andersen, Carl Schroeder
Task Force               Object – None
consent votes            Abstain – None
                         No vote recorded – Jeffrey Mann
                         The GMA requires that each fully planning city and county comprehensive plan include both a
                         capital facility and utility element (RCW 36.70A.070(3) and (4)). Proper planning for capital
                         facilities and utilities ensures services are available as growth occurs within communities.

                         While cities and counties plan for growth, implementation requires close coordination and
                         planning with school districts, ports, PUDs, water/sewer utilities, and fire districts. Land use and
                         zoning changes, along with development regulation changes, can impact a provider's ability to
                         provide services. Early communication and coordination is essential as future growth is planned.

Topic overview           The GMA requires a full planning county and city to broadly disseminate to the public a public
and background           participation program identifying procedures providing for early and continuous public
                         participation as part of the periodic comprehensive plan update, which is completed every 10
                         years.

                         The GMA also requires cities and counties to adopt notice procedures that are reasonably
                         calculated to provide notice when amendments to comprehensive plans and development
                         regulations are made. These may be amendments to land use and zoning maps, or development
                         regulations associated with the periodic comprehensive plan update or changes made more
                         frequently.

                         The public participation notice provisions (RCW 36.70A.035) currently identify many people and
Issue                    groups who should be provided notice when amendments to comprehensive plans and



COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                      13
Recommendation 1 – Increased comprehensive plan
coordination
                      development regulations are proposed. This includes affected individuals, tribes, and schools.
                      However, ports and many capital facilities and utility providers are not included. More specific
                      language will ensure all affected capital facilities and utility providers are notified when these
                      changes are proposed by a city or county. Language is also proposed to call out capital facility
                      and utility providers in the section focused on examples of providing reasonable notice.

                      Currently, public participation plan requirements (RCW 36.70A.140) do not require cities or
                      counties to provide capital facility and utility providers opportunities for early coordination on
                      possible land use, zoning, or development regulation changes prior to dissemination of changes
                      to the public. Connecting early in the process could provide opportunities to discuss the impacts
                      of the proposal(s) and the capital facility and utility providers' ability to service future growth. By
                      linking RCW 36.70.140 to noticing provisions in RCW 36.70A.035 and RCW 36.70A.110,
                      opportunities for increased coordination can occur when amendments to comprehensive plans
                      and development regulations are proposed.


Possible statutes     RCW 36.70A.035 - Public participation—Notice provisions
                      RCW 36.70A.140 - Comprehensive plans—Ensure public participation
to be amended

Do we expect this
recommendation Yes ☐                      No ☒
to have a state
budget impact?

Did this issue                                           Report or study: Collaborative Roadmap Phase III (2023) and A
                      Yes ☒               No ☐
derive from a                                            Roadmap to Washington’s Future (2019)
previous study?
                      1) Increases focus on providing early coordination with service providers.
                      2) Increased coordination could result in fewer instances of having disconnects between
                         comprehensive plans and plans by service providers.
Advantages            3) Many jurisdictions may already take these steps in practice, so the impact to cities and
                         counties should be minimal.
                      1) Could increase city/county staff time and/or resources to implement.
                      2) It could take additional time to identify which capital facility and utility providers to
Disadvantages            coordinate with.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                    14
Recommendation 2 – Increased countywide planning policy
coordination
                         Countywide planning policy (CPP) changes to increase early coordination between cities,
Topic                    counties, and service providers.


Recommendation
               The Legislature should amend the GMA Countywide Planning Policy requirements (RCW
and link to    36.70A.140) to increase early coordination with special purpose districts early in the planning
               process.
proposed
statutory      Proposed legislative changes for Recommendation 2
amendments
                         Consent – Brian Sayrs, Paul Jewell, Andrea Smiley, Bryce Yadon, Robin Proebsting, Travis
                         Nelson, Kathy Curry, Eric Ffitch, Carl Schroeder
Task Force               Object – None
consent votes            Abstain – Dave Andersen
                         No vote recorded – Jeffrey Mann
                         CPPs are written policy statements used solely for establishing a countywide framework from
                         which county and city comprehensive plans are developed and adopted. There are many
                         common planning goals between a county and the cities within a county. CPPs provide a
                         framework to capture those. CPPs focus on issues such as shared goals for planning in
                         unincorporated urban growth areas, economic development strategies, and countywide
                         transportation systems. CPPs are also where many communities adopt population, housing, and
Topic overview           employment projections, which serve as the basis for the periodic comprehensive plan update
                         process. Comprehensive plans are required to be consistent with CPPs.
and background
                         King, Pierce, Snohomish, and Pierce counties are required to update CPPs prior to the periodic
                         comprehensive plan update cycle. It is optional in all other communities. Changes currently
                         proposed as part of this recommendation would not change the update requirements. Also note
                         that the process to adopt CPPs is memorialized by jurisdictions. Inviting other groups to
                         participate would not necessarily make them members who would vote on CPP amendments.
                         RCW 36.70A.210 states that "The legislature recognizes that counties are regional governments
                         within their boundaries, and cities are primary providers of urban governmental services within
                         urban growth areas." While cities may be the primary provider of services, in many cases, they are
                         not the only provider of urban governmental services, capital facilities, and utilities within urban
                         growth areas.

                         Currently, the CPP section of the GMA does not recognize the critical role that non-jurisdictional
                         urban governmental service providers, ports, and school districts play as growth is facilitated.
                         Given that the CPPs are where urban growth area policies are developed and growth is often
Issue                    allocated prior to each community completing a periodic comprehensive plan update, this could
                         provide a great opportunity for enhancing early communication and coordination.

                         Providing an optional opportunity for non-jurisdictional urban governmental service providers,
                         ports, and school districts to be invited to participate in and cooperate with the countywide
                         planning policy development and adoption process. Given that many urban governmental service
                         providers, ports, and school district boundaries cover multiple jurisdictions, this could also
                         provide an efficient way to communicate.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                    15
Recommendation 2 – Increased countywide planning policy
coordination
Possible statutes     RCW 36.70A.210 – Countywide Planning Policies
to be amended

Do we expect this
recommendation Yes ☐                     No ☒
to have a state
budget impact?

Did this issue                                         Report or study: Collaborative Roadmap Phase III (2023) and A
                      Yes ☒              No ☐
derive from a                                          Roadmap to Washington’s Future (2019)
previous study?
                      1) Provides opportunity to engage important planning partners earlier in the planning process.
Advantages            2) Recognizes that urban governmental services are often not provided by cities and counties.


Disadvantages         1) May require more meetings or processes to update CPPs. This includes costs to update,
                         given that additional coordination may lead to additional CPP amendment requests to
                         consider and/or respond to. Funding for CPP updates is typically not provided by the state.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                16
Recommendation 3 – Project permit notifications
                        Ensuring providers of capital facilities and utilities are notified of project permit applications.
Topic
                        The Legislature should consider changes to city and county notification requirements for project
Recommendation permit applications (RCW 36.70B.110). This is intended to increase opportunities for
               coordination on project permit applications, such as rezones, subdivisions, and conditional use
and link to    permits, for example, which are considered outside of the periodic comprehensive plan update. A
proposed       separate recommendation has been prepared addressing coordination during the periodic
               comprehensive plan update process.
statutory
amendments     Proposed statutory amendments for Recommendation 3

                        Consent – Brian Sayrs, Paul Jewell, Andrea Smiley, Bryce Yadon, Robin Proebsting, Travis
                        Nelson, Kathy Curry, Eric Ffitch, Dave Andersen, Carl Schroeder
Task Force              Object – None
Consent Votes           Abstain – None
                        No vote recorded – Jeffrey Mann
                        RCW 36.70B - Local Project Review guides the process that counties and cities utilize to process
                        permit applications. This statute implements Goal 7 of the GMA, which states that "Applications
Topic overview          for both state and local government permits should be processed in a timely and fair manner to
                        ensure predictability." Permit applications include any land-use or environmental permit or license
and background          required by a local government for a project action. This includes applications such as
                        subdivisions and site-specific rezones, for example.
                        Non-county and city service providers, such as special purpose districts, play an important role in
                        providing necessary services to development projects. Some projects, such as rezoning to
                        increase a property's density, could impact a service provider's ability to provide needed
                        services. This is especially true if the use exceeds the densities or uses anticipated by the county
                        or city.

                        RCW 36.70A.110 provides the process that counties and cities utilize when public notice is
                        required for a project permit application. While the current statute states that "…reasonable
                        methods to give the notice of application to the public and agencies with jurisdiction…", the statute
Issue                   does not specify that non-jurisdictional capital facility and utility providers are provided public
                        notice.

                        To address this, the notice of application requirements could be modified to ensure the notice of
                        application is provided to capital facility and utility providers. This type of notice is already
                        occurring in many jurisdictions across the State of Washington. However, small modifications to
                        RCW 36.70B.110 will ensure capital facility and utility providers are notified when cities and
                        counties are processing project permit applications.


Possible statutes       RCW 36.70B.110
to be amended

Do we expect this
recommendation Yes ☐                          No ☒
to have a state
budget impact?



COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                       17
Recommendation 3 – Project permit notifications
Did this issue                                           Report or study: Collaborative Roadmap Phase III (2023) and
                      Yes ☒                No ☐
derive from a                                            A Roadmap to Washington’s Future (2019)
previous study?
                      1) Ensures providers of services are provided notice of applications that could impact their
Advantages               services.
                      2) Many jurisdictions already provide this type of notification.
                      3) This recommendation does not add new notice requirements. It provides statutory clarity on
                         important groups for whom notification is required.

                      1) Could require jurisdictions to increase those notified of permit applications. It could take
Disadvantages            time to identify those to send notice to.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                 18
Recommendation 4 – Tools and technical resources
                      Under the GMA, RCW 36.70A, cities and counties have varied planning requirements. To better
                      support cities and counties in implementing the GMA, the state provides a variety of resources,
Topic                 tools, and data. Typically, these tools are administered through the Department of Commerce
                      and the department’s associated budget for ongoing assistance.
                      The State should provide cities, counties, and special districts, especially those with fewer
                      resources, with additional technical resources to assist in meeting capital facility and utility
                      element planning requirements under the Growth Management Act (RCW 36.70A.070(3) and
                      (4)). If other departments, organizations, or agencies are better suited, the Department of
                      Commerce should coordinate with them to create and publish resource materials.

                      This should include:
                      1) Templates to gather existing conditions and financial data from special purpose districts for
                          capital facility plans.
Recommendation        2) Provide tools and data to better facilitate coordination.
                      3) Text templates that explain the purpose of capital facility and utility plans and why gathering
                          information from special districts is critical.
                      4) Help identify early indicators of growth constraints for cities, counties, and special districts,
                          especially in our faster-growing communities.
                      5) Develop trainings designed to help cities, counties, and special purpose districts understand
                          each other’s roles and collaborate more effectively, such as identifying constraints and
                          limitations in current plans and processes. This could be included as part of the existing
                          local short course on planning.
                      Consent – Brian Sayrs, Paul Jewell, Andrea Smiley, Bryce Yadon, Robin Proebsting, Travis
                      Nelson, Kathy Curry, Eric Ffitch, Carl Schroeder
Task Force            Object – None
consent votes         Abstain – Dave Andersen
                      No vote recorded – Jeffrey Mann
                      Based on discussions with the working groups and task force, several tools have been identified
                      that may support cities, counties, and service providers in their planning efforts. Templates for
                      capital facility planning may assist county/city staff in efficiently gathering necessary
Topic overview        information during the Comprehensive Plan periodic update, consistent with RCW 36.70A.070(3)
and background        and (4). Given the strict timelines associated with the update process, planning staff often have
                      limited opportunities to collect data from service providers, making streamlined tools especially
                      valuable.
                      Mandating additional requirements in statute can strain cities and counties, as well as staff
                      capacity. One way to make planning requirements easier to implement could be funding, through
Issue                 the Department of Commerce, to provide templates, tools, and other resources for cities,
                      counties, and service providers to better coordinate.


Possible statutes     No statutes to be amended.
to be amended

Do we expect this                                       Although this recommendation has implications for the state
recommendation Yes ☒                      No ☐
                                                        budget, it is anticipated that the necessary funding will be
                                                        provided through existing allocations within the Department of
to have a state                                         Commerce.
budget impact?




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  19
Recommendation 4 – Tools and technical resources
Did this issue                                         Report or study: Collaborative Roadmap Phase III (2023) and A
                      Yes ☒              No ☐
derive from a                                          Roadmap to Washington’s Future (2019)
previous study?
                      1)   Ease and simplicity of coordination and outreach.
Advantages            2)   Efficiency in communication.
                      3)   Assist jurisdictions with fewer resources.
                      4)   Tools such as templates would only need to be created once and would not create recurring
                           costs for the State.

                      1) Providing tools and resources often have ongoing costs that would need to be balanced
Disadvantages            against other priorities for the Commerce budget.
                      2) Funding to provide ongoing tools and technical resources may be challenging to provide
                         over a long period.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                            20
Recommendation 5 – Incentivize coordination and coordinated
projects
                      Incentivize Coordination and Coordinated Projects
Topic
                      Agencies that provide grants and loans to cities, counties, and special purpose districts should
                      implement options to increase early coordination and incentivize (road, water, sewer, power)
                      projects where multiple projects are coordinated together, such as road and sewer
                      improvements.

                      This could include the following recommendations:
                      1) Requiring documentation as part of grant and loan applications within road rights-of-way,
                          demonstrating notification to other agencies that own roads/utilities within the right-of-way,
                          has occurred. Notification that a grant or loan is being applied for could open early
                          opportunities for project coordination.
                      2) Requiring documentation as part of grant and loan applications within road rights-of-way,
                          asking if the system improvement supports growth anticipated within the adopted county or
                          city comprehensive plan.
                      3) Incentivize projects or consider scoring priority for projects where multiple projects are
Recommendation            addressed within one grant or loan application and where demonstrated project savings
                          could occur. This could occur even where funding sources are separate. Ensure that priority
                          scoring does not negatively impact the ability of small utilities or those where coordination
                          is not possible (such as not having utilities in the road right-of-way) from receiving project
                          funding.
                      4) Consider developing a statewide GIS database to collect data from cities, counties, and
                          capital facility and utility providers to understand where there are programmed projects
                          across different jurisdictions and agencies. This data could be collected by the State, in
                          partnership with cities and counties, from capital facility plans, and show where there may
                          be crossover for planned projects. This could increase options to coordinate projects,
                          increase project efficiency, and save project dollars. This database could be limited to
                          urban growth areas or faster-growing areas, and when implemented, grant and loan
                          applications could be contingent or scored higher/lower based on the data being provided.
                      Consent – Brian Sayrs, Paul Jewell, Andrea Smiley, Bryce Yadon, Robin Proebsting, Travis
                      Nelson, Kathy Curry, Eric Ffitch, Dave Andersen, Carl Schroeder
Task Force            Object – None
consent votes         Abstain – None
                      No vote recorded – Jeffrey Mann
                      Capital facilities and utilities are often located within road rights-of-way. In addition to a city or
                      county owning the road, water, sewer, and power are often located within the same right-of-way
                      and owned by different service providers.

                      Improvements to capital facilities and utilities may occur to replace systems that have outlived
                      their lifespan. Improvements may also occur to increase the capacity necessary to facilitate
Topic overview        development and redevelopment within urban areas. The need to upgrade systems to facilitate
and background        urbanization is likely to increase in our fastest-growing communities.

                      Where more than one agency has improvements planned within the same right-of-way within a
                      short period of time, finding ways to connect projects could increase project efficiency, save
                      project dollars, and lessen impacts to businesses and the transportation system, which can
                      occur during projects that impact road rights-of-way during reconstruction.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                    21
Recommendation 5 – Incentivize coordination and coordinated
projects
                      Coordination of projects across different agencies for water, sewer, power, or road
                      improvements within the same geographical area could provide increased project efficiency,
                      save project dollars, and lessen impacts to businesses and the transportation system, which
                      can occur during projects that impact road rights-of-way during reconstruction.

                      However, this is a complicated topic to address for several reasons:
                      1) There are often several different agencies/private companies that own capital facilities or
                         utilities within a right-of-way.
                      2) Grant and loan programs for projects are often designed to fund a road improvement or
                         sewer/water improvement but may not support multiple projects. This creates issues with
                         concurrent funding.
                      3) In addition to cities and/or counties, there are often many capital facilities and utility
                         owners. This makes project coordination more difficult.
Issue                 4) There are challenges to having multiple agencies working on a project within the same
                         right-of-way. This includes facilitation of grants/loans, grant/loan timing, liability issues, and
                         coordination of contractors, to name a few.
                      5) While coordination projects across agencies may be efficient, there are no known
                         incentives for agencies to take extra steps to ensure projects are well coordinated.

                      Documenting that coordination has occurred as part of grant and loan programs and
                      incentivizing best practices may provide opportunities to link projects. In a meeting with the
                      Transportation Improvement Board (TIB) and Public Works Board (PWB), it was noted that
                      application changes can occur administratively. Therefore, no RCW or WAC changes would be
                      required. Creating a state GIS database, linking capital facility plans, could provide even greater
                      opportunities to link projects early in the process and find long-term ways to incentivize these
                      projects.


Possible statutes     None proposed
to be amended

Do we expect this
                                                         Recommendations 1-3 listed above are not expected to incur
recommendation Yes ☒                      No ☐           a state budget impact. Recommendation 4 may require
to have a state                                          funding.

budget impact?

Did this issue                                           Report or study: Collaborative Roadmap Phase III (2023) and
                      Yes ☒               No ☐
derive from a                                            A Roadmap to Washington’s Future (2019)
previous study?
                      1) Recommendations could increase communication and opportunities to coordinate projects
                         across agencies.
Advantages            2) Recommendations 1-3 do not require statute or rule changes.
                      3) Recommendations 1-3 do not require additional state funding.
                      4) Recommendation 4, when implemented, may pay for itself through early identification of
                         projects. This could lead to increased opportunities for co-funding projects.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                     22
Recommendation 5 – Incentivize coordination and coordinated
projects
                      1) May create additional information and steps for grant and load applicants.
Disadvantages         2) Coordinating projects may create project efficiency. However, it could create more work for
                         the agencies coordinating projects.
                      3) Recommendation 4 would require state resources to implement and maintain.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                            23
Recommendation 6 – Coordinated water system plans timing
                         The timing of capital facility and utility plan updates by counties and cities as part of the
Topic                    periodic comprehensive plan update and plan updates that inform that process.

                         The Legislature should consider amending RCW 70A.100.050 and the implementing rules in
Recommendation WAC 246-293 to require updating Coordinated Water System Plans (CWSPs) every 10 years,
and link to    provided funding is available for those updates. The timing of the updated plan should align
               with the city and county comprehensive plan updates, which utilize CWSPs as part of capital
proposed       facility planning.
statutory      Proposed statutory amendments for Recommendation 6
amendments
                         Consent – Brian Sayrs, Paul Jewell, Bryce Yadon, Robin Proebsting, Kathy Curry, Eric Ffitch,
                         Dave Andersen, Carl Schroeder, Jeffrey Mann, Andrea Smiley, Travis Nelson
Task Force               Object – None
consent votes            Abstain – None
                         No vote recorded – None

                         Growth Management Act
                         The GMA requires fully planning counties and cities to complete a periodic comprehensive plan
                         update every 10 years. The timing for periodic comprehensive plan updates is found in RCW
                         36.70A.130(5).

                         The periodic comprehensive plan process focuses on planning for the next 20 years of growth
                         (people, jobs, and housing) and includes important goals such as:

                         1) Update policies and regulations to reflect changes in state law and case law since the last
                            plan update.
                         2) Update critical area regulations in accordance with the latest Best Available Science (BAS).
                         3) Implement community vision for the next 20 years.

                         Planning for 20 years of growth requires planning for all the infrastructure to support that
                         growth, including capital facilities and utilities. However, counties and cities do not always
                         provide all the capital facilities and utilities needed to support planned growth.

Topic overview           Coordinated Water System Plans
                         The Public Water System Coordination Act of 1977 (RCW 70A.100) and implementing rules
and background           (WAC 246-293) provide the foundation for coordinated water system plans. The purpose of
                         RCW 70A.100 is to:

                         1) To provide for the establishment of critical water supply service areas related to water
                            utility planning and development;
                         2) To provide for the development of minimum planning and design standards for critical
                            water supply service areas to ensure that water systems developed in these areas are
                            consistent with regional needs;
                         3) To assist in the orderly and efficient administration of state financial assistance programs
                            for public water systems; and
                         4) To assist public water systems to meet reasonable standards of quality, quantity, and
                            pressure.

                         The development and updating of coordinated water system plans implements this directive by
                         providing “…a plan for public water systems within a critical water supply service area which
                         identifies the present and future needs of the systems and sets forth means for meeting those
                         needs in the most efficient manner possible...” (RCW 70A.100.030).




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                    24
Recommendation 6 – Coordinated water system plans timing
                      When a county or city completes the periodic update, capital facility and utility elements are
                      updated. The capital facility plan, which is part of the capital facility element, carries
                      requirements such as having:
                      1) At least a six-year plan that will finance such capital facilities within projected funding
                          capacities and clearly identify sources of public money for such purposes.
                      2) A requirement to reassess the land use element if probable funding falls short of meeting
                          existing needs and to ensure that the land use element, capital facilities plan element, and
                          financing plan within the capital facilities plan element are coordinated and consistent.

                      When capital facilities and utilities cannot support growth as planned, the land-use element of a
                      city or county comprehensive plan must be reevaluated. This emphasizes the importance of
                      planning, which occurs to support growth planning.
Issue                 Coordinated Water System Plans provide valuable information that is necessary for cities and
                      counties as they plan for growth. In fact, when plans are updated, the plan is reviewed by the
                      county legislative authority(ies) in the county(ies) in which the critical water supply service area
                      is located, and at least one hearing must be held. (WAC 246-293-300). This emphasizes the
                      importance of Coordinated Water System Planning and implementing jurisdictions.

                      However, pursuant to WAC 246-293-280, “The coordinated water system plan shall be reviewed
                      and updated by the water utility coordinating committee at a minimum of every five years or
                      sooner, if the water utility coordinating committee feels it is necessary…”

                      While updating Coordinated Water System Plans is valuable, the lack of funding is a barrier in
                      many communities to updating these plans.
                      Based upon the GMA and implementing rule language, possible statutes to amend would
                      correspond with the following services:
Possible statutes     RCW 70A.100.050 - Development of water system plans for critical water supply service areas.
to be amended         WAC 246-293-280 - Coordinated water system plan—Update. (Note that rule changes would be
                      required for consistency with statutory changes.)


Do we expect this
recommendation Yes ☒                     No☐
to have a state
budget impact?

Did this issue                                           Report or study: Collaborative Roadmap Phase III (2023) and
                      Yes ☒              No☐
derive from a                                            A Roadmap to Washington’s Future (2019)
previous study?
                      1) Would result in greater consistency between capital facility planning and coordinated water
                         system plans.
                      2) Would provide cities and counties with better information when planning for growth and
Advantages               developing capital facility plans.
                      3) Funding to support a Coordinated Water System Plan will ensure plan updates occur.

                      1) Cost to fund coordinated water system plan updates and determine a consistent funding
Disadvantages            source.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  25
Recommendation 7 – School district planning and siting
                      Improve coordination and planning between cities, counties, and school districts.
Topic
                      The state's current approach to planning and funding schools has been observed as a barrier to
                      increased planning and coordination between counties, cities, and school districts. The
                      Legislature should consider further studying and working with the Office of Superintendent of
                      Public Instruction (OSPI) to revise funding formulas and approaches to school planning. This
Recommendation        effort should focus on modifying processes to allow school districts to anticipate growth,
                      proactively plan, and build infrastructure, such as schools, in alignment with adopted city and
                      county comprehensive plans. This effort should focus on our fastest-growing cities, counties,
                      and school districts.
                      Consent – Brian Sayrs, Paul Jewell, Bryce Yadon, Robin Proebsting, Kathy Curry, Eric Ffitch, Dave
                      Andersen, Carl Schroeder, Jeffrey Mann, Andrea Smiley, Travis Nelson
Task Force            Object – None
consent votes         Abstain – None
                      No vote recorded – None
                      Cities, counties, and school districts across Washington State collaborate under the Growth
                      Management Act (GMA) to align school infrastructure planning with local comprehensive plans.
                      RCW 36.70A.070(3) requires jurisdictions to include school district capital facility plans in their
                      capital facilities element, incorporating inventories of existing facilities, forecasts of future
                      needs, proposed locations and capacities for new schools, and a six-year financing plan with
                      identified funding sources. In many communities, this partnership also supports the adoption
                      and implementation of impact fees to help fund school capacity needs. However, impact fees
                      typically cover only a small portion of the costs and are often reduced or capped, limiting their
Topic overview        effectiveness. This recommendation highlights the importance of strengthening coordination to
                      ensure school infrastructure planning supports long-term community development.
and background
                      While cities, counties, and many other capital facility service providers plan proactively for future
                      growth to anticipate capital facility improvements necessary to maintain levels of service, as
                      defined in WAC 365-196-210(26), the process for school districts is much more challenging. To
                      better align school planning with that of cities and counties, several issues would need to be
                      addressed, especially in our faster-growing communities. This recommendation outlines those
                      issues that the Legislature should consider if it wishes to take this up in coordination with the
                      OSPI.
                      Cities and counties update comprehensive plans every ten years. One of the primary goals for a
                      comprehensive plan is to plan for and accommodate the next 20 years of people, jobs, and
                      housing, while ensuring transportation facilities and infrastructure, parks, utilities, schools, and
                      capital facilities are planned for and improvements subsequently implemented to accommodate
                      that growth. When growth outpaces the services necessary to accommodate that growth, the
                      GMA includes “a requirement to reassess the land use element if probable funding falls short of
                      meeting existing needs…” (RCW 36.70A.070(3)(e)). Measuring the ability to provide capital
                      facilities and services for growth is often expressed through adopted levels of service.
Issues
                      While cities, counties, and many other service providers proactively plan for growth, the process
                      for planning schools is often reactive. If the goal, especially in our fastest-growing communities,
                      is to have schools anticipate and plan for growth, and to anticipate the need for schools where
                      growth is planned, planning processes need to change. This includes the following three issues:
                      1) Land for future schools
                      2) Land necessary to accommodate schools
                      3) Process to fund and build schools




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  26
Recommendation 7 – School district planning and siting
                      1. Land for future schools
                      In Washington’s fastest-growing communities, school districts struggle to locate and purchase
                      properties for future school sites. They often cannot compete with the private sector for property
                      purchases, and the number of sites available within existing cities and unincorporated UGAs that
                      are large enough to accommodate future schools is sparse at best. As a result, school districts
                      face the following challenges:
                      4) They must purchase available properties when acquisition funding is accessible, often
                           requiring long-term holding.
                      5) They are obligated to acquire and hold land outside UGA boundaries when future
                           development is permissible.
                      6) They struggle to find suitable sites for schools, limiting their ability to meet capacity
                           demands from previously approved residential developments.

                      This means that there is often no relationship between where school districts are purchasing
                      properties for future school sites and where cities and counties are planning for the next 20
                      years of people, jobs, and housing. It also means that growth is permitted without first planning
                      for adequate school facilities. If this trend continues, it is likely that we will often see new
                      schools’ facilities, especially in the Puget Sound region, built further away from areas where
                      growth is being focused or not constructed at all. The first issue is evidenced by RCW
                      36.70A.211and RCW 36.70A.213. These sections of the GMA outline conditions for siting
                      schools in rural areas that will serve urban populations. The latter issue is not addressed.

                      Puget Sound Regional Council estimates 1.8 million new people and 1.2 million jobs coming to
                      King, Snohomish, Kitsap, and Pierce Counties between 2017 and 2050 alone. This region is also
                      focused on maintaining existing UGA boundaries and focusing growth within existing urban
                      areas. While RCW 36.70A.211and RCW 36.70A.213 provide some short-term options to ensure
                      schools have land to accommodate future students; it is important that this issue is recognized
                      and proactively addressed. If this can occur, it is more likely that future schools will be planned in
                      a consistent manner with where cities and counties are planning for growth.

                      2. Land necessary to accommodate schools
                      WAC 392-342-020(2) states that “The minimum acreage of the site should be five usable acres
                      and one additional usable acre for each one hundred students or portion thereof of projected
                      maximum enrollment plus an additional five usable acres if the school contains any grade above
                      grade six. A district considering the use of a site that is less than the recommended minimum
                      usable acreage should assure that:
                      (a) The health and safety of the students will not be in jeopardy;
                      (b) The internal spaces within the proposed facility will be adequate for the proposed educational
                      program;
                      (c) The neighborhood in which the school facility is or will be situated will not be detrimentally
                      impacted by lack of parking for students, employees, and the public; and
                      (d) The physical education and recreational program requirements will be met.”
                      This means that for a new high school with a capacity of 1,500 students, the minimum acreage
                      which should be considered is 25 acres, unless each of the findings in (a)-(d) is met. It is also
                      noteworthy that the current rule utilizes the term “usable acres.” This means that for sites that
                      may have critical areas or other encumbrances, the acreage needed to site new schools may be
                      much larger. The current OSPI manual (page 114) references WAC 392-342-020.

                      The Legislature should consider whether minimum acreage requirements and the criteria to vary
                      from those requirements should be amended. Amendments would recognize that in our fastest-
                      growing communities, large school sites, close to where growth will occur, will be harder to come
                      by, and the cost of purchasing those properties will continue to increase. Future schools in
                      growing communities may need to be built differently, and OSPI standards may need to be
                      updated to recognize this.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                   27
Recommendation 7 – School district planning and siting
                      3. Process to fund and build schools
                      The OSPI is the primary agency charged with overseeing public K–12 education in Washington
                      state. Working with the state's 295 public school districts and seven state-tribal education
                      compact schools, OSPI allocates funding and provides tools, resources, and technical
                      assistance.
                      OSPI funds new school construction through the State School Construction Assistance Program
                      (“SCAP”).

                      Under current law, SCAP funds cannot be used to purchase school sites. In addition, the SCAP
                      funding formula is based on “unhoused students,” meaning that school districts must first
                      demonstrate that existing schools are overcapacity under the OSPI funding formula (which is
                      typically more conservative than locally adopted program standards). In other words, the SCAP
                      formula does not allow school districts to anticipate or plan for new enrollment growth; it only
                      allows them to address it after it has arrived. Importantly, eligibility for SCAP funding requires
                      secured local funds, typically through voter-approved capital bonds, which requires a 60%
                      approval threshold.

                      RCW 36.70A.070(3)(e)
Possible              RCW 36.70A.211
statutes/rules/       RCW 36.70A.213
                      WAC 392-342-020
standards to be       RCW 28A.525
amended               OSPI school facilities manual


Do we expect this
recommendation Yes ☒                  No ☐
to have a state
budget impact?

Did this issue
                      Yes ☐           No ☒
derive from a
previous study?
                      1) Enables school districts to anticipate growth and plan for future infrastructure needs,
                         reducing the lag between residential development and school construction.
                      2) Encourages new schools where cities and counties are planning for growth.
                      3) Supports cohesive planning across jurisdictions, ensuring that schools are part of broader
                         infrastructure and service strategies.
                      4) Aligning school planning with comprehensive plans can lead to more strategic investments
                         and reduce redundant or misaligned expenditures.
Advantages            5) Ensures that students in growing communities have timely access to adequate school
                         facilities, improving educational outcomes.
                      6) Fosters partnerships between cities, counties, and school districts, leading to more
                         integrated and responsive governance.
                      7) Revisiting OSPI’s funding formulas could allow for more flexible and forward-looking
                         financial planning, especially in high-growth areas.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                28
Recommendation 7 – School district planning and siting
                      1) Aligning multiple jurisdictions and agencies (cities, counties, school districts, OSPI) may
                         require significant time, effort, and resources.
                      2) Revising funding formulas and securing upfront capital for land acquisition and school
                         construction may face political and fiscal hurdles.
Disadvantages         3) Changes to RCWs and WACs may be needed, which can be a lengthy and contentious
                         legislative process.
                      4) Tying school infrastructure planning more closely to comprehensive plans could slow down
                         residential development if school capacity is not assured.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                            29
Recommendation 8 – Long-term protection of industrial lands
                       Long-term protection of industrial lands.
Topic

Recommendation
               The Legislature should amend the Growth Management Act (GMA) to modify the notice
and link to    requirements to better protect industrial zones located adjacent to housing zones.
proposed
               Proposed statutory amendments for Recommendation 8
statutory
amendments
                       Consent – Brian Sayrs, Paul Jewell, Bryce Yadon, Robin Proebsting, Kathy Curry, Eric Ffitch, Dave
                       Andersen, Carl Schroeder, Jeffrey Mann, Travis Nelson
Task Force             Object – None
consent votes          Abstain – Andrea Smiley
                       No Vote Recorded – None
                       Industrial land plays an important role within the GMA. They provide economic development and
                       employment and assist in fulfilling Land Use element requirements in RCW 36.70A.070(1). In
                       many counties and cities, ports play an integral role and facilitate economic development and
                       employment on industrial lands. Port element requirements contained within RCW 36.70A.085
                       require:

                       Protection of the core areas of the port and port-related industrial uses within the city.
                       Identification and resolution of key land use conflicts along the edge of the core area, and
                       minimization and mitigation, to the extent practicable, of incompatible uses along the edge of
                       the core area.
Topic overview
                       However, the port element requirements are only required for:
and background
                       Comprehensive plans of cities that have a marine container port with annual operating revenues
                       in excess of sixty million dollars within their jurisdiction must include a container port element.
                       Comprehensive plans of cities that include all or part of a port district with annual operating
                       revenues in excess of twenty million dollars may include a marine industrial port element.

                       Increasing long-term protection of industrial lands may facilitate greater coordination among
                       cities, counties, and ports that are not subject to RCW 36.70A.085. This recommendation may
                       also address conflicts between non-port-owned industrial lands and uses, and zoning, which may
                       create conflicts.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                  30
Recommendation 8 – Long-term protection of industrial lands
                      The GMA requires cities and counties to plan for employment, including industrial land uses.
                      With the exception of the Port element requirements, the GMA does not address the inherent
                      conflicts that can arise when industrial uses are located near other uses, such as housing.
                      Industrial uses may be loud, operate 24 hours a day, and emit odors incompatible with housing.
                      These realities create tension in land-use planning, especially in areas where growth pressures
                      are high. Some cities and counties have addressed this by implementing buffers and setbacks
                      between zones with conflicting uses.

                      In the most urban counties, the focus is on maintaining UGA boundaries and promoting
                      urbanization and redevelopment. This trend places increasing pressure on industrial lands, which
                      are essential for economic stability and regional functionality. As redevelopment accelerates, the
                      challenge of preserving industrial areas while accommodating other land uses increases.

                      The statutory framework under RCW 36.70A.060(1)(b) highlights how Washington law currently
Issues                addresses proximity issues for natural resource lands, requiring notices for development near
                      agricultural, forest, or mineral resource lands. RCW 36.70A.060(1)(b) states that "counties and
                      cities shall require that all plats, short plats, development permits, and building permits issued for
                      development activities on, or within five hundred feet of, lands designated as agricultural lands,
                      forestlands, or mineral resource lands, contain a notice that the subject property is within or near
                      designated agricultural lands, forestlands, or mineral resource lands on which a variety of
                      commercial activities may occur that are not compatible with residential development for certain
                      periods of limited duration."

                      Extending this notice requirement under RCW 36.70A.070(1) to include development activities
                      on, or within five hundred feet of, lands designated for industrial use would provide greater clarity
                      for property owners and developers. Such an approach would ensure that parties are informed of
                      the proximity to industrial lands and the potential for evolving industrial operations over time.


Possible statutes     RCW 36.70A - New section
to be amended

Do we expect this
recommendation Yes ☐                 No ☒
to have a state
budget impact?

Did this issue                                          Report or study: Collaborative Roadmap Phase III (2023) and A
                      Yes ☒          No ☐
derive from a                                           Roadmap to Washington’s Future (2019)
previous study?
                      1) Increases early communication when residential uses are planned near existing lands zoned
                         for industrial uses.
Advantages            2) May reduce potential conflict when a new use on land zoned for industrial uses are proposed
                         near existing residential uses.

                      1) Requires cities and counties implement new standards so notice is provided on all plats,
Disadvantages            short plats, development permits, and building permits.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                    31
Recommendation 9 – Port and economic development elements
                        Expanding port element requirements for faster-growing cities.
Topic
                        The Legislature should:
                        1) Amend RCW 36.70A.080 (Comprehensive plans – Optional elements) to make Port
                           elements an optional comprehensive plan element for cities and counties that are not
Recommendation             subject to the requirements of RCW 36.70A.085. See attachment A.
                        2) Provide funding for cities and counties, who optionally decide to develop Port elements,
and link to                consistent with RCW 36.70A.085. If necessary, prioritize funding for faster-growing
proposed statutory         communities or those with larger ports.
                        3) The Legislature should fund the development and implementation of the Economic
amendments                 Development element consistent with the requirements in RCW 36.70A.070(10).

                        Proposed statutory amendments for Recommendation 9
                        Consent (to all three parts) – Brian Sayrs, Paul Jewell, Bryce Yadon, Robin Proebsting, Eric
                        Ffitch, Dave Andersen, Jeffrey Mann, Andrea Smiley, Travis Nelson
Task Force              Consent (to parts 1-2) - Carl Schroeder
                        Object – None.
consent votes           Abstain (to part 3) – Carl Schroeder
                        No vote recorded – Kathy Curry
                        Cities that have a marine container port with annual operating revenues of more than $60
                        million ], or that have all or part of a port district with annual operating revenues over $20
                        million within their jurisdictions, must include a port element in their comprehensive plans
                        (RCW 36.70A.085). This element must be consistent with other comprehensive plan elements
                        and developed collaboratively between cities, ports, and tribes. Currently, this element is
                        required only for the cities of Seattle, Tacoma, and Everett (Port of Seattle, Port of Tacoma,
                        Port of Everett).
Topic overview          Where applicable, a port element must include policies and programs that focus on topics,
and background          such as:
                            • Defining and protecting the core areas of ports and port-related industrial uses.
                            • Providing reasonably efficient access to the core area through freight corridors.
                            • Identifying and resolving key land use conflicts along the edge of the core area.

                        In developing a port element, a city may use one or more approaches, including a port overlay
                        district, industrial land banks, buffers and transition zones between incompatible uses, joint
                        transportation funding agreements, and more.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                32
Recommendation 9 – Port and economic development elements
                         Ports play a vital role in the health and vitality of communities across Washington. However,
                         except for cities currently required to create port elements under RCW 36.70A.085, there are
                         no requirements to ensure consistency between city and county comprehensive planning, and
                         the port comprehensive scheme required under RCW 53.20 and 53.25.

                         Making the port element an optional element and providing funding to create Port Elements
                         could increase opportunities for proactive planning without amending who is subject to Port
                         Element requirements. Where funding is limited, prioritization could be focused on faster-
                         growing communities and ports. In addition, the current requirements in RCW 36.70A.085
                         apply only to cities. This would provide counties with an optional process for enacting Port
                         Elements.

                         In 2002, the Legislature passed HB 2697, which required cities and counties to include an
                         economic development element in their comprehensive plans. The current language in RCW
Issues                   36.70A.070(7) focuses on “An economic development element establishing local goals, policies,
                         objectives, and provisions for economic growth and vitality and a high quality of life.”

                         While creating an economic development element is a requirement, cities and counties have
                         never been required to create a new element because of RCW 36.70A.070(10) which states
                         that “Requirements to incorporate any such new or amended elements shall be null and void until
                         funds sufficient to cover applicable local government costs are appropriated and distributed by
                         the state at least two years before local government must update comprehensive plans as
                         required in RCW 36.70A.130.”

                         Funding the development and implementation of an economic development element is
                         another way to increase planning and coordination between cities, counties, and ports, given
                         the importance of ports as economic drivers in communities across the state.


Possible statutes to RCW 36.70A.080 – Comprehensive plans – Optional Elements
be amended

Do we expect this
recommendation           Yes ☒       No ☐
to have a state
budget impact?

Did this issue                                         Report or study: Collaborative Roadmap Phase III (2023) and A
                         Yes ☒       No ☐
derive from a                                          Roadmap to Washington’s Future (2019)
previous study?




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                                 33
Recommendation 9 – Port and economic development elements
                        1) Expand integration of planning for Ports and comprehensive planning by cities.
                        2) Provide additional opportunities to coordinate land use, capital facility, and economic
                           development strategies and planning while recognizing that cities, counties, and ports
                           work under separate statutory structures.
                        3) Increased coordination and planning may have a strong return on investment for ports and
Advantages                 cities.
                        4) Recommendation would provide funding.
                        5) Recommendation would not apply until the next periodic comprehensive plan update,
                           which provides ample time for cities and ports to consider the best approaches to
                           implement new planning requirements.

                        1) Require cities and counties to create an Economic Development element.
Disadvantages           2) Funding would be required.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                          34
Appendix B: Library of statutes and rules
This appendix provides an inventory of relevant state laws and administrative rules for each local government
under review of this report to study and recommend how to integrate select special purpose districts into the
state's growth management planning process. It is worth clarifying that not all local entities will have
corresponding statues and rules.

Cities and counties
Revised Code of Washington (RCW)
  RCW 36.70A.020 – GMA planning goals
  RCW 36.70A.030 – GMA definitions
  RCW 36.70A.070(3) – GMA capital facilities element
  RCW 36.70A.070(4) – GMA utilities element
  RCW 36.70A.130 – GMA comprehensive plan update schedule
  RCW 36.70A.085 – GMA port element
  RCW 36.70A.211 – GMA siting of schools – Impact fees
  RCW 36.70A.212 – GMA siting of schools
  RCW 36.70A.213 – GMA schools – Extension of public facilities and utilities to rural areas

Washington Administrative Code (WAC) implementing rules or state guidance
  WAC 365-196-210 – Additional definitions
  WAC 365-196-415 – Capital facility element
  WAC 365-196-420 – Utilities element
  WAC 365-196-350 - GMA schools – Extension of public facilities and utilities to rural areas



Port districts
Revised Code of Washington (RCW)
  RCW 36.70A.085 – GMA port element
  RCW 53 – Ports



School districts
Revised Code of Washington (RCW)
  RCW 28A – Common school provisions RCW 28A.150 – General provisions
  RCW 28A.335.090 – Conveyance and acquisition of property
  RCW 28A.335.110 – Real property – Annexation to city or town
  RCW 28A.335.220 – Eminent domain
  RCW 28A.525 – School bonds
  RCW 28A.525.020 - Defines eligibility for state school construction funding
  RCW 28A.530.010 and RCW 28A.530.080 – Allows school districts to issue bonds for construction, but requires
  voter approval for major capital projects
  RCW 36.70A.020(12) – Public facilities and services
  RCW 36.70A.070(3) – Capital facilities plan
  RCW 36.70A.150 – Identification of lands useful for public purposes


COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                         35
 RCW 36.70A.211 – GMA siting of schools – Impact fees
 RCW 36.70A.212 – GMA siting of schools
 RCW 36.70A.213 – GMA schools – Extension of public facilities and utilities to rural areas
 RCW 82.02.050 to RCW 82.02.100 – Impact fees

Washington Administrative Code (WAC) implementing rules or state guidance
 WAC 365-196-350 - GMA schools – Extension of public facilities and utilities to rural areas
 WAC 365-196-415 – Guidance on long-term school capacity planning under the GMA
 WAC 392 – Superintendent of Public Instruction
 WAC 392-342-015 – Educational specifications
 WAC 392-342-020 – School Site selection – For purposes of school construction assistance
 WAC 392-343-019 – Establishes minimum classroom space per student for state construction assistance
 WAC 392-343-035 – Requires school districts to submit a Capital facilities plan to qualify for state funding
 WAC 392-343-045 – Space allocations – Enrollment projection provisions

Water and sewer districts and public utility districts
Revised Code of Washington (RCW)
 RCW 54 – Public Utility Districts
 RCW 57.02 – Water and Sewer Districts
 RCW 57.16 – Comprehensive Plan Local Improvement Districts (including comprehensive plan requirements)
 RCW 90.48 - Water Pollution Control
 RCW 36.94 – Sewer, Water, and Drainage Systems

Washington Administrative Code (WAC) implementing rules or state guidance
 WAC 246-293 (220-300) Coordinated Water System Plans
 WAC 173-240-050 – General sewer plan (includes comprehensive plan requirements)
 WAC 246-290 – Group A Public Water Supplies




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                         36
Appendix C: Key issues identified by working groups
School districts
Growth projections and forecasting
 School districts need early and accurate growth projections, ideally in 5–10-year increments.
 Forecast data should be aligned across cities, counties, and school districts.
 Assistance from OFM is needed to support short- and long-term forecasting.
 There’s no systematic method for improving projection accuracy, especially in rural areas.
 Require service providers to align planning with growth targets, including statutory updates to match county
 Periodic Update schedules.

Land Capacity Analysis (LCA) and siting
 Improve LCA by incorporating housing, jobs, and public facilities, especially schools, to support siting decisions.
 Zoning and land availability are critical for school siting, especially in rural areas.
 Recommendations are needed for shared facilities, flexible design, and standards that reduce land needs for
 urban schools.

Rural district challenges
 Rural districts often lack long-range planning expertise and staffing capacity.
 Planning requirements should be lighter for rural counties, focusing on key comprehensive plan components.
 Siting schools in rural areas is difficult due to zoning and land availability.

Coordination with cities and counties
 School districts frequently lag behind cities in planning due to restrictive boundaries and lack of coordination.
 Proactive engagement is needed—receiving a CFP copy is not sufficient.
 Regular meetings between schools and local governments (such as, every two years) help build relationships
 and share data.
 King County’s school siting Task Force is a model for improving coordination.
 Prioritize early engagement with non-city/county service providers, ensuring joint identification of growth
 opportunities and constraints during updates to countywide planning policies.

Policy and planning thresholds
 Align planning thresholds between school districts and local governments to trigger coordinated planning.
 Consider thresholds for ramping down rural growth and density to address school capacity issues.
 School districts should be included in planning committees and processes earlier to allow for better siting and
 infrastructure planning.

Port districts
Coordination and engagement
 Ports coordinate extensively with cities and counties through both formal (e.g., container port elements, subarea
 plans) and informal mechanisms (e.g., regular meetings, stakeholder engagement).
 Coordination varies by region and port size; rural ports need “right-sized” approaches to avoid unnecessary
 burdens.
 Reject mandatory early engagement requirements, as ports value flexibility and independence in planning.
 Relationships and informal coordination are often more effective than formal mandates, though political
 leadership can disrupt progress.


COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                              37
Transition zones and land use compatibility
 Ports face challenges from incompatible land uses, such as residential encroachment near industrial areas.
 Transition zones (such as buffers) are critical to protect port operations and maintain land use compatibility.
 Strengthen statutory language to protect ports, requiring cities and counties to implement measures like
 transition zoning.
 GMA’s localized lens can overlook regional impacts of port activity, creating blind spots in planning.

Capital facilities planning
 Ports lack a standardized Capital Facilities Plan (CFP) template; developing one could improve consistency
 without adding paperwork burden.
 Coordination with other service districts (such as, schools, fire, or others) is essential for infrastructure planning.
 Some ports already estimate job impacts and align harbor improvements with comprehensive plans.

Economic development and job planning
 Ports play a key role in regional economic development, but GMA does not differentiate between types of jobs
 (such as, industrial vs. service).
 Support targeted siting policies, especially near ports and freight routes, to preserve industrial job centers.
 Economic development elements in comprehensive plans are optional and often delayed; funding is needed to
 support port participation.
 Regulatory and economic development priorities can clash, requiring better alignment of terms and timelines.

Planning timelines and regional structures
 Timing misalignments between port planning and city/county comprehensive plans create coordination
 challenges.
 Regional planning bodies (such as the Puget Sound Regional Council (PSRC)) are complex and resource-
 intensive, even for large ports.
 Increase coordination language in the GMA without adding procedural burdens.

Best practices and tools
 Develop best practices for coordination between ports, cities, and counties, tailored to different port sizes and
 contexts.
 Examples from Kitsap County, Port of Seattle, and Port of Everett show successful integration of port planning
 with local and regional efforts.
 Gathering and sharing coordination models and planning structures would help ports navigate GMA processes
 more effectively.

Water and sewer districts and public utility districts
Urban Growth Area (UGA) coordination
 Increase flexibility around UGA boundaries, especially for utility extensions just outside designated areas, though
 this raises concerns about encouraging future development.
 Clarify and standardize exemptions, recognizing that some already exist and are typically managed at the city or
 county level, but may benefit from clearer guidance.
 Request expert input on UGA and GMA policy, indicating a need for further discussion to understand the
 implications and feasibility of proposed changes.
 Concerns about development in unincorporated UGAs without sewer infrastructure, leading to reliance on septic
 systems.
 Water and sewer districts should be engaged during UGA land swaps and comprehensive plan amendments.



COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                               38
 Concerns about development in unincorporated UGAs without sewer infrastructure, leading to reliance on septic
 systems.
 Suggest integrating utility input into capital facilities planning and land capacity analysis.

Planning timelines and synchronization
 Misalignment between Department of Health, Department of Ecology, and GMA planning timelines.
 Suggest staggering planning cycles (for example, a three-year offset) between cities, counties and service
 providers.
 Outdated planning documents and inconsistent update schedules hinder coordination.

Service area boundaries and capacity forecasting
 Need realistic service area definitions and timelines for extending services.
 Early communication is critical when changes occur.
 Use water quality reports and updated studies to inform planning and public engagement.

Capital facilities and utility planning
 Integrate water/sewer district plans into county capital facilities plans.
 Require consistent timelines and projections across jurisdictions.
 Emphasize planning for infrastructure upgrades aligned with growth and land-use changes.

Coordination and communication
 Cities and counties often plan growth without involving water and sewer districts.
 Recommend feedback loops and coordination guidance (such as through meetings and training).
 Upzoning should trigger communication with service providers to assess capacity.

Smaller districts and resource limitations
 Smaller rural districts face staffing and resource challenges.
 Suggest building networks for training, education, and emergency support.
 Coordination is especially needed in critical aquifer recharge areas.

Population and demand projections
 Encourage real-time sharing of growth forecasts and capacity data.
 Use regional databases (such as the one used by PSRC) for consistent planning inputs.
 Planning should reflect actual growth trends, not just projections.

Disaster and emergency planning
 Develop joint protocols for system redundancies, backup power, and rapid repairs.
 Establish clear emergency contact networks and public messaging strategies.

Challenges and recommendations
 Lack of coordination leads to misaligned infrastructure and growth planning.
 Need for clearer directives and requirements for engaging service providers.
 Consider thresholds for infrastructure capacity when densification occurs.
 Coordination should include both public and private utility providers.




COLLABORATIVE ROADMAP PHASE IV - LEGISLATIVE REPORT AND RECOMMENDATIONS                                       39


File and source

File
2025_collaborative-roadmap-phase-iv-legislative-report-final-120a61d3-e313-.pdf
Size
1,253,842 bytes
SHA-256