Economic Infrastructure Subcommittee — Committee Meeting Notice (November 18, 2025)
Summary
Meeting packet for the House of Representatives Economic Infrastructure Subcommittee, Tuesday, November 18, 2025. The meeting notice lists presentations on Fueling Florida's Energy Needs. The packet opens with a natural gas presentation titled Fueling Florida's Prosperity with Resilient Energy Solutions, presented by Dale Calhoun, followed by Energy Transfer and Florida Gas Transmission (FGT) slides that describe the FGT system as about 5,380 miles of pipe with a mainline system capacity of 4.1 Bcf/day. The packet's closing slides, dated November 18, 2025, discuss solar and battery storage and state that in 2024 FPL's fuel-saving technologies saved customers $867 million.
Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used
Cite this document
“Economic Infrastructure Subcommittee — Committee Meeting Notice (November 18, 2025).”
Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2025-11-18-3286-economic-infrastructure-subcommittee-meeting-packets-m-7714f17eb1/
, SHA-256 47bd342fbc55c0147f8ec5bf2110a2aa08c333456a50e3cd99864d97a1d1d5c7.Full text
Economic Infrastructure Subcommittee
Tuesday, November 18, 2025
10:30 AM - 12:30 PM
Reed Hall (102 HOB)
Daniel Perez Chip LaMarca
Speaker Chair
Committee Meeting Notice
HOUSE OF REPRESENTATIVES
Economic Infrastructure Subcommittee
Start Date and Time: Tuesday, November 18, 2025 10:30 AM
End Date and Time: Tuesday, November 18, 2025 12:30 PM
Location: Reed Hall (102 HOB)
Duration: 2.00 hrs
Presentations on Fueling Florida’s Energy Needs
NOTICE FINALIZED on 11/07/2025 3:31PM by Marks.Amie
11/07/2025 03:32:01PM Leagis ® Page 1 of 1
1- FNGA
Fueling Florida's Prosperity with
Resilient Energy Solutions
- l1~i--~Brr1't L.
NATURAL GAS limitless opportunity
Novembe r 2025 · Presented by Dale Calhoun
NATURAL GAS
0 Powers Florida's Economy
0 Essential to Reducing Our
Carbon Footprint
0 Critical to Domestic Security
0 Reliable During Natural
Disasters
NATURAL GAS
Serving Florida Consumers
Investor Owned Interstate Pipelines
Gas Utilities Municipal Gas
Utilities Florida Gas Transmission
TECO/Peoples Gas
Gulfstream Natural Gas
Chesapeake Utilities/
Florida Public Utilities, Southern Natural
Florida City Gas
Special Gas Gulf South Pipeline
Sebring Gas Districts
St. Joe Gas Sabal Trail
COMMERICIAL
Lodging Food Service Health Care
Laundries &
Groceries Dry Cleaners Schools
RESIDENTIAL
Water Cooking Space Clothes
Heating Heating Drying
Pool/spa Outdoor
Heating Entertainment Generators
INDUSTRIAL
Citrus Pulp/Paper Phosphate
Concrete &
Gypsum Asphalt Manufacturing
Fuels in Florida
Saddle Creek first ordered CNG-fueled Freightliner trucks in autumn 2011.
wwwgoHARtorg I HART - ijlHWX
coi,011110
-~
,.T',....,.,..~.
.
•
.,
~
-yt ~..,....,.......,..,,..--
.. .
•
~
Producing Wells
Transmission Lines
Coml)ressor
Stations -------------._ . _f l LNG
or Propane/Air Plant
Undergr0und ~
Storag~ "}----tj-f
~ II LDC City Gate
11
11 (Regulators/Meters)
~
/
Distribution Mains (Lines)
Residential
Customers
Commercial
Customer
• •
Florida Gas Trans m1ss1on
, Alex1ndria
H1ttlt1burg' A , o,i,11
LOUIS! ANA
stin'
~,, p
~'
~o
r.,o
'IJ'
~\ w.
~ ,. ' I' I
\ 0
,, ...
O'
•
\:,
. ..,•
t"
•
n
•.,
,. ..,
......"'
:!
G u I f •,
0 f M e X C 0 ::.•
:,, "' •
·-"
'
......
0
Gulfstream Natural Gas
r. ,.::,,,
'.. ·······:
•,,
r
•.....
,····· '-··•-l.
! 'L'l,
: -,.,
.... ..l _r-1
:~r
\
....L.. ........~.PETER~~Y.~~........... :::
Southern Natural
Oklahoma
Muldon
Bear Elba
Creek Island
Gulf South Pipeline
Barnett Shale AL
Bossier
Sands
FL
TX
Eagle Ford
BOARDWALK
Shale
10001
Gulf South Pipeline Company, LP -
PIPELINE PARTNERS
Gulf South Pipeline &Storage
Sabal Trail Transmission
.
cn Midcontinent
; /press --------~........... ~
Sabal Trail
ALABAMA
.........
TRANSM SSION
I .....
5
FlondaGas
Transmission
tl
100 miles
Supply Availability & Storage Connections
Napoleonville Southern Pines
Bay Gas
11
10
9 12
8
7 75 13
14
6
15
16
24
4
17
3 Golden Triangle
26
Petrologistics
Bobcat 18
31
30
27 19
Tres Palacios
Pine Prairie
20
21
22
Growing U.S. Supply Source
U.S. Crude Oil and Dry Natural Gas Production
(AEO2020 Reference Case)
Crude Oil Production Dry Natural Gas Production
Million Barrels per Day Trillion Cubic Feet
019 2019
50
hi o o·ec o is o
0
1
0 d
10
o er 8
5 e
Biogas made from organic
sources th rough anaerobic
processes contains 45 - 65%
methane.
Biogas is treated to remove
moisture, particulates,
contaminents and other gases
(CO 2, 0 2, N2, and VOCs); this
increases the methane content
to 90% or greater - typically
96-98% for pipeline injection .
The resulting product is
renewable natural gas.
ANAEROBIC DIGESTERS
*U.S. EPA
,..,,,.11"'1"
·-~ Gr,D ~, L.
bxrJ
NATURAL GAS limitless opportunity
Fueling Florida's Prosperity with
Resilient Energy Solutions
2 – Energy Transfer FGT
Florida Gas Transmission
Economic Infrastructure Subcommittee
Meeting
November 18, 2025
Energy Transfer
Natural Gas Pipelines - Interstate
Gulf
PEPL TGC TW FGT SR FEP Tiger MEP 1 Rover Stingray EGT MRT SESH Run 2 Total
Miles of Pipeline 6,300 2,190 2,590 5,380 765 185 200 510 720 335 5,700 1,675 290 335 27,175
Capacity (Bcf/d)
Storage (Bcf)
Ownership
--
/
2.8
57.0
100%
0.9
13.0
100%
2.1
--
100%
4.1
--
50%
2.0
--
100%
----------
2.0
--
50%
2.4
--
100%
1.8
--
50%
3.4
--
32.6%
0.4
--
100%
4.8
29.3
100%
1.7
48.9
100%
1.1
--
50%
3.0
--
100%
32.5
148.2
Interstate Asset
Overview
Transwestern
Panhandle Eastern
EGT Operates 13 interstate
FGT
MRT
pipelines in 20 states
SESH • ~27,000 miles
Gulf Run
Tiger
• 32+ Bcf/d of capacity
Trunkline Gas • ~148 Bcf of owned or
Fayetteville Express
Rover
contracted storage
Sea Robin/Stingray Represents pipelines operated by ET
Midcontinent Express
• Storage
1/ Operated by JV partner.
2/ Excludes ~0.4 Bcf/d of capacity leased by EGT’ on Zone 1 2
Supply Options
Energy Transfer’s Pipeline Network Allows Enhanced Supply Access
V
Energy Transfer’s natural gas Minnesota Wlsconsirt
pipelines are well connected to key
production areas Marcellus/Utica Pennsylvania
Transwestarn Anadarko
Energy Transfer Assets
Permian Barnett Haynesville
lnle-r:itate Pipeline
- - ETC 7 ge-~ r, ~line-
- - Faye:tev e E~p·ess Pipe line
(~ J U\JG Expar. Tamiinc=.I
lntrag;tate- Plpellne - - flQ-j ja Gas Tr3nsrr i~:.icn
- - (~(lm:mr.hF! l rnll I-' p ~lllll'! - - Gull ::-3-1;).eS T f tll)$1'1' i$$iOfl
Eagle Ford
- - EOIT - - t.11(:(:1.)(ltln-enl r:0.1)1-e.::: s Pil)ehn,e
·- ---- ET Fuels - - Panhai"dle ER~ern Pipel rn.,
- - ETC Kat,· - - Rc..~er Pipeline
·- • • -- Hot•Slon Pil)e I ir1e - - Saa Robin Pipe ine
- - (J,1 .:::1s - - S li ' 'Jgf.l'( PipelirlCC Or-nt);) f' }'
- - Ohb Ri\ler Sj•s1em (ORS) - - n .-,nsweS~ff'I Pif1eli r1,e
·----- Pyote - - Trunklin.,. G."l~
- - - - RIGS - - Gulf Run Pip:-line (Pro,:.::>Y-"dj
...... Retl Blu"I E•1.PnlSS - - Enable G~ Tro.>1:mi:ssi:.n
·----- T-;;i,i$ Pei;os P iflel in~ - - Mi:;~i~'-::iir;pi Ri•Jt.:I T1;.m:;n 1i:..~1011
-S(lullie.isl Su ;ll)l'f t-teei c er Map includes ET’s wholly-owned and joint venture natural gas pipelines (intra and interstate)
3
FGT
Economic Benefits to the State of Florida
• Pays between $30 and $40 million every year in
state property taxes
• Has 260 employees based locally
• Donates ~$30,000 each year to local communities:
• Schools
• Churches
• Youth sports
• Summer camps
• Food, clothing and toy drives
Recipients include:
• Brooker Community School
• Edgewood Children’s Ranch
• Loaves & Fishes, Inc
• Union County Education Foundation
• Boggy Creek Camp
4
Florida Gas Transmission (FGT)
System Overview
• Alu ndr1•
L U!SlANA
sti11°
p
• ~5,380 miles of pipe and a mainline system capacity of 4.1
Bcf/day ....
• >265 points of delivery in Florida, including >60 power plants
• >50 interconnects with interstate and intrastate pipelines
Srowm;.vi//p
• Direct connections with ten major storage facilities
-.
FGT is the leading provider of natural gas to the Florida market, delivering ~60% of the natural gas
consumed in the state
5
FGT Storage Access
• pa1m Coa1ot p
Southern Pines
1.5 Bcf/d
DCP Spindletop Petal Storage (via Destin
82,000 Mcf/d and Gulf South Merrell)
750,000 Mcf/d
8rowns11i/l,.
Golden Triangle ...
250,000 Mcf/d
f M Petro logistics
ll
-.
::
100,000 Mcf/d 'b
..
~
.......0
Total storage interconnect capacity of >5.5 Bcf/d
6
FGT Market Area Growth History
MMBtu/ day
LJil
.,.~
0
.,.~
LJil
.,.[i\J
0
.,.[i\J
LJil
.,.-w
0
.LJil
w-
0 0 0 0 0 0 0
...0 ...0 ...0 ...0 .,.0 0
"0 ...0
0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2008
200'9
2010 .,,
C)
2011 -I
2012 n
DJ
2013 -cs
DJ
2014 n
2015
....
_
'<
,.
< 201,s -I
_ ,.
0
D)
.. 2017 3
tD
2018 r--
_ ,
::s
.
201'9 tD
2020
2021
2022
2023
2024
2025
7
Recent Market Area Projects
8
Federal Energy Regulatory Commission (FERC)
FERC's Natural Gas Act Authority
• NGA grants FERC authority to regulate "transportation of natural gas in interstate
commerce''
- Includes interstate natural gas pipelines, storage facilities, LNG facilities
- Ensures that the rates, terms and conditions of service by interstate natural gas pipelines,
including storage and LNG facilities, are just and reasonable and not unduly discriminatory
• FERC certificates construction and operation of interstate natural gas pipelines,
including storage and LNG facilities, upon a public convenience and necessity
finding; FERC also must approve abandonment of facilities
• NGPA - Grants FERC the authority to regulate intrastate gas pipelines that operate
in interstate commerce
• FERC regulates rates and practices of oil pipeline companies engaged in interstate
transportation
- Establishes equal service conditions to provide shippers with equal access to oil pipeline
transportation
- Establishes reasonable rates for transporting petroleum and petroleum products by pipeline
- But it is more light-handed regulation, compared to the regulation of the electric, hydroelectric,
and natural gas pipeline industries
9
Filing Requirements
Prior Notice Request vs. Section 7{c) Projects and Timing of Projects before FERC
• Automatic Authorization under Blanket Certificate Regulations
- FERC's Blanket Certificate program enables specified routine activities, including minor construction projects, without significant
FERC involvement provided the covered activities are consistent with all applicable environmental regulations
- Minor/Simple Projects requiring Company Based Environmental Review with Agencies, and are anticipated to cost less than $14.5
Million
- Process time dictated by Scope of Work and Environmental Review
• Prior Notice Request under Blanket Certificate Regulations
- Minor/Simple Projects requiring basic Environmental Review, which are anticipated to cost less than $41.10 Million [Currently in
review before FERG]
- Temporary Limit increased to $61.65 Million, if in service by May 1, 2027
- Approximately 75-day process from filing date - Usually Auto-Authorized @ 75-days
• Section 7(c) of the Natural Gas Act ("NGA"), 15 U.S.C. 717(c)
- Projects requiring a more comprehensive Environmental Review, generally based on Project Scope and which are anticipated to
cost more than $41.10 Million - Requires FERC issue a "Certificate" and "Notice to Proceed" before commencement of Project
Activities
- ROUTINE: Approximately 20 Month process from filing date without Applicant Prepared Draft Environmental Assessment (APDEA)
- PRE-FILING: Approximately 14-17 Month process from filing date with an APDEA
- ROUTINE: Approximately 20 Month process from filing date without pre-filing requiring an Environmental Impact Statement (EIS)
- ROUTINE: Approximately 18-19 Month process from filing date with pre-filing requiring an Environmental Impact Statement (EIS)
10
3 - Chesapeake
11-18-2025
Florida House Economic
Infrastructure Subcommittee
Presentations on Fueling Florida's Energy
Needs
Will Haffecke, Assistant Vice President
Florida Operations
Subsidiaries of Chesapeake Utilities Corporation
Serving Florida
Holmes
Jackson - - Nassau
Escambia _I Gadsden
F_LORIDA~
t r ~NSACOLA
- - Clay · c1TVGAS
·washington - - - - - St.Johns Local
Bay
Suwannee Distribution
Calhoun
Union
- - Flagler FLORID~ PUBLIC~
UTILITIES
Liberty Gilchrist - - Volusia
Alachu - - Lake
pEIIIIIIISULA ~
Levy - - - - - Seminole
Marion lntrastait e
Citrus - - - - - Orange PIPELINE
Sumter
---....iiiiiiii\1:,'r'
Tra nsmission
===~AJl:~ ::-- Osceola
Hernando ~'---- Brevard
Pasco - ~
,=~ - Indian River Virt ual Pipelline
Hillsborough Okeechobee M~RLIIII~
- Natural Gas, Propane and Electric Services GAS SliRVIC S
- Electric/Propane Polk - - -
WEST PALM BEACH
- Natural Gas and Propane
IRN G
- Natural Gas
Develop1
ment
-
*
f!II
Propane
Office Locations
Eight Flags CHP Facility
Glades
Hendry
-
DOAAL
Miami-Dade
Propane
Gas Transportation Services
Distribution
Full Circle Dairy AD
2
560 $1.9B 270,239 43 $1.9B
w
0
CAPITAL INVESTMENT
EMPLOYEES TOTAL ASSETS CUSTOMERS COUNTIES SERVED
OVER 10 YEARS
Capital Investment in Florida
908 7,154 ~ Eight Flags CHP Plant
MILES OF MILES OF
AM ELIA ISLAND
DISTRIBUTION LINES PIPELINE "--------------,------ Full Circle RNG Facility
LEE
LNG Storage Plant Propane Gas Supply
Q HOMESTEAD, FL Q LANTANA, FL •✓-
--,------- Safety Town
DEBARY
> Storage capacity of >Exceptional propane
270,000 gallons of LNG service for businesses
Delivery capability of when natural gas is
> 10,000 Dth/d unavailable
Safety Town Eight Flags CHP Plant
Q DEBARY, FL AMELIA ISLAND, FL
>Hands-on and classroom Combined heat and power Propane Gas Supply
training enabling (CHP) plant serves ~50% of LANTANA
collaboration with first Amelia Island’s demand for
responders and other electricity
community partners
Full Circle Dairy RNG '!!- LNG Storage Plant
HOMESTEAD
Q Lee, FL
Dairy waste-to-RNG
> facility producing
100,000 Dth/d
3
>RNG injected in FPU
Yulee interconnect
F__LORIDA---,... FLORID~ PUBLIC~
CITYGAS UTILITIES
SAFELY DELIVERING NATURAL GAS
− Implementing new technologies for leak detection, remote
monitoring and safe driving
FL01110A~
" 1'YcAs
− Conducting trainings at Debary Safety Town for employees,
contractors and first responders across the state
− Upgrading gas meters across service territories to improve
data accuracy and operation capabilities
− Gas Control Center operates 24/7 across all Company’s
entities
− Enhancing reliability and safety with system upgrades and
replacements: FPU's GUARD and FCG's SAFE programs
• Total Main Line Installed: 78.7 miles
• Services Installed: 3,342
• Main Retired: 46.4 miles
4 • Services Retired: 2,813
• Ongoing Projects: 64 F__LORIDA~ FLORID~ PUBLIC~
CITYGAS UTILITIES
Growth and Expansion
Recent Projects to Meet Demands
Wildlight Expansion, Nassau County: various phases of gas
installation for new development with construction ongoing.
Newberry, Alachua County Expansion: conversion of existing
Company-owned propane community gas systems to natural gas
Miami Inner Loop Pipeline Projects: several pipeline projects to
support growth, increase distribution system reliability and
enhance FCG's ability to obtain gas from various access points
Central Florida Reinforcement Projects: FPU expansion in Plant City
and Lake Mattie driven by supply needs from significant
population growth
Florida Renewable Natural Gas Supply Projects: FCG projects,
located in Brevard, Indian River and Miami-Dade counties
bringing renewable natural gas produced from local landfills
5
F__LORIDA~ FLORID~ PUBLIC~
CITYGAS UTILITIES
Natural Gas Demand Continues to Grow
Increasing demand driven by population growth, increased commercial
and industrial activity and the use of natural gas for electricity generation
• Residential growth 3.9% in 2025
• Commercial growth 1.2% in 2025
• Advances in space and maritime leading LNG fueling demands
Projects and Initiatives on the Horizon to Meet Demands
• Building out natural gas for residential and commercial use in new
neighborhoods across service territories
• Natural gas expansion for Florida’s Space Coast to serve fuel
demands of space and maritime
• Natural gas expansions in South Florida to add supply and reliability
• Additional RNG and Marlin virtual pipeline transportation opportunities
bringing renewable natural gas produced locally to distribution
system
• Increased use of Compressed Natural Gas (CNG) by commercial and
municipal fleets
6 • Consideration of LNG storage projects to meet critical energy services
demand during weather-related disruptions or for high-use customers F__LORIDA~ FLORID~ PUBLIC~
CITYGAS UTILITIES
Meeting Demands and Planning
− Our Design Day models capture projected growth trends to
ensure the utilities have sufficient capacity and supply
− Ensure capacity and supply models capture projected growth
and identify potential projects
• Interstate capacity acquisition on multiple Southeast
pipelines
• Intrastate capacity projects
− Gas supply - supply procurement process focuses on system
reliability and efforts to mitigate market price volatility impacts
to customers
• Supply diversification
• Natural gas storage at Bay Gas
• LNG supply at Homestead helps system resiliency and
reliability
• On-system RNG projects using locally sourced supply
7
F__LORIDA~ FLORID~ PUBLIC~
CITYGAS UTILITIES
Subsidiaries of Chesapeake Utilities Corporation
8
F__LORIDA~ FLORID~ PUBLIC~
CITYGAS UTILITIES
4 – TECO Peoples Gas
Fueling Florida’s Energy Needs
with Natural Gas
NOVEMBER 18, 2025
Peoples Gas Company Overview
MAKING LIFE BET TER FOR OUR COMMUNITIES BY DELIVERIN G SAFE,
RESILIENT, CLEAN, AFFORDA BLE NATURAL GAS ENERGY SOLUTION S
Market reach Local presence Customer base
Peoples Gas’ service 890 team members make 500,000+ diversified
territory extends
Q Peoples Gas a core part of iil customers — growing
throughout Florida. the communities we serve. at a rapid pace.
Substantial assets Diversified supply Corporate support
14,871 miles of distribution, Upstream transportation Owned by Emera, one of
6,362 miles of service lines, contracts with multiple North America’s largest
277 miles of transmission. interstate pipelines. energy companies.
2
Peoples Gas Company Overview
PEOPLES GAS IS COMMIT TED TO SAFE AND
RELIABLE OPERATION S ACROSS FLORIDA
With a legacy dating back to 1895, Peoples Gas has grown JACKSONVILLE•
to become Florida’s largest provider of safe, resilient, clean, PANAMA CITY
and affordable natural gas energy solutions. •
• Strong safety culture and industry leader in safety OCALA e DAYTONA•
o #1 priority for our employees and contractor partners EUSTIS e
• Serving Florida from 14 service areas across the state ORLANDO•
• Innovative practices for safe, efficient system and • TAM;ALAKELAND
delivery of natural gas ST PETE •
• AVON PARK
o GPS and barcoding • SARASOTA
o Advanced leak detection •
JUPITER
••
•FT MYERS
o State-of-the-art system monitoring and control center
Peoples Gas Service Territory FT LAUDERDALE•
o Targeted damage prevention awareness outreach MIAMI•
Regional Offices
o Updated mobile command vehicle
3
Peoples Gas Company Overview
PEOPLES GAS IS A LEADER IN CUSTOMER SERVICE
• Currently serving more than 500,000 customers in all
major metropolitan areas of the state
• 91% Residential
• 9% Commercial
• Ranked #1 in residential customer service by J.D
Power for the 11th year in a row and #1 for Brand
Saraaota (13")
Appeal
• Named as one of the Most Trusted Brands in the
nation for the 11th time based on results from the
2024 Cogent Utility Trusted Brand & Customer
Engagement: Residential study by Escalent, as well as
Miami(1Z%)
an Environmental Champion (9 years) and Customer
Champion (11 years)
J■dcaonvllle (12"1
C U STO M E RS BY S E R V I C E A R E A 4
Natural Gas in Florida
UNIQUE MARKET AND UNIQUE CUSTOMER NEEDS
• Energy of choice
• Backbone of healthcare, hospitality and tourism industries
• Produces more than 75% of the state’s electricity; helps in
reducing overall carbon emissions
• Energy reliability and resiliency is essential in our unique
tropical climate
5
Always Ready to Respond
PREPAREDNESS IS A YEAR-ROUND FOCUS
MAJOR FLORIDA WEATHER INCIDENTS IN THE PAST DECADE
• 2017 – Hurricane Irma – Tampa
• 2018 – Hurricane Michael – Panama City
• 2022 – Hurricane Ian – Fort Myers
• 2023 – Hurricane Idalia – St. Petersburg, Tampa
• 2024 – Hurricane Helene – St. Petersburg, Tampa
• 2024 – Hurricane Milton - St. Petersburg, Tampa, Sarasota
SYSTEM RESILIENCY
• 2024: Out of more than 500,000 customers, just 1,400 were
without gas service after two major hurricanes – mostly due to
structural damage and not an issue with our ability to deliver
Assessing damage on Fort Myers Beach
after Hurricane Ian in 2022.
6
Strategic Growth
FOCUSED ON RELIABILITY, RESILIENCY, AFFORDA B ILITY AND LAYERED ENERGY SOLUTION S
FLORIDA’S CRITICAL INFRASTRUCTURE EMERGING AREAS
• Power Generation • AI and data centers
• Military • Growing generator load, particularly in coastal
• Healthcare areas
• Sea Ports
• Transportation
• Data and Systems
DISTRIBUTED ENERGY SOLUTIONS
• Microgrid
• Combined Heat and Power
• Chiller
• Gas Heat Pump
7
Stable Supply Supports Florida’s Energy Reliability
FOUR MA JOR PIPELINES PROVIDE SUFFICIEN T CAPACITY AND SUPPLY FROM DIVERSE BASINS TO MEET
CURRENT AND FORECASTED DEMAND, WITH FLEXIB ILITY TO SUPPORT GROWTH AND LNG EXPORTS.
Florida is served by four major Tulsa Nashville boro
Northeast Supply
interstate pipelines with a combined Midcontinent Supply Ral
capacity of 6.7 Bcf/day, compared to
Ol<Jahoma Gry 28% of US production
18% of US production
average in-state demand of Lit eR,
approximately 4.5 Bcf/day, representing
about 70% utilization.
@Miii§@i:i&@i§ I
I -UHM+Hi
• Provides a meaningful buffer to
accommodate seasonal peaks, industrial fou
Wortl
Gulf Coast Supply
growth, and emerging LNG export 24 % of US production
dynamics.
• With the growing LNG demand in the Gulf
@§#•N+ii!Mii
and data center demand, future diversity ldi::ihi Sonat--0. 7 Bet/day
of gas supply in support of customers will Houston
San Anto1110
be critical.
• Florida Gas Transmission (FGT) is
considering expansion of its pipeline
system in Florida to flow more gas into
the state. Other interstate systems are
likewise considering expansions to bring
gas from other basins.
Interstate Transmission Pipeline Future gas via interstates
8
-----►
Sustainability in Action
INVESTING IN LOWER-CA RB ON ENERGY SOLUTION S
R E N E WA B L E N AT U R A L G A S CO M P R ES S E D N AT U R A L G A S L I Q U E F I E D N AT U R A L G A S
We build, own and operate RNG facilities to Peoples Gas serves 54 CNG stations We help Florida ports fuel industries that
move supply across our system and extend across Florida, and we’ve helped fleets need a more sustainable option, and we’re
access and use. reduce emissions, improve reliability investing in infrastructure to expand access
and lower costs. and use of LNG to improve reliability and
resiliency of the state’s natural gas system.
9
THANK YOU
5 – FPL
Driving Florida’s Energy Future
Brandon Stankiewicz, Vice President, Universal Solar & Storage
Florida Power & Light Company
November 18, 2025
FPL generates electricity from diverse sources, creating an efficient
and resilient system to serve customers at the lowest possible cost
• Generation sources include:
o Fuel-efficient natural gas plants
o Safe, reliable nuclear plants
o Cost-effective solar generation
o New deployment of battery storage
• Since 2001, FPL has saved customers
more than $16 billion in fuel costs
o In 2024, FPL’s fuel-saving technologies
saved customers $867 million
o Solar alone has delivered over $1 billion in
fuel savings since 2016
2
FPL continues to invest in low-cost solar energy and is now adding
battery storage into its diverse mix of power generation sources
• FPL solar energy centers operating today generate
enough energy to power more than 1.5 million
homes across Florida each year
• As a generation option, solar provides several
advantages:
o Scalable – can add MW to closely match expected load
growth
o Speed to market – can permit and construct typical site
within 24-months
o Lowest cost option relative to alternatives based on
today’s pricing
• Paired with battery storage, FPL can capture “free”
energy for use during peak periods, increasing
reliability
3 I November 18, 2025
Solar and battery storage can be combined to serve a large portion of
load during the day, reducing fuel consumption fleet-wide
Example - Solar + Battery Plant Output Example - System Wide Plant Dispatch
80 - - - -
- - -
.... -
. ----
Plant Output (Megawatts)
~
60
-
Operating Megawatts
.... ..
40
n.
-
20
..
I
n n - --I
I
-
-u
~ ~
~
-
l -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
- - --
-- -
- -
1 2 3 4 -5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
--
(20) ~
- - -
Hour Ending Hour Ending
■ Clipped Energy Capture ■ Discharge of Clipped Energy ■ Solar ■ Battery ■ Nuclear ■ Solar ■ CC ■ Peakers
4 I November 18, 2025
File and source
- File
- 2025-11-18_3286_economic-infrastructure-subcommittee_meeting-packets_mtg14901.pdf
- Size
- 21,865,784 bytes
- SHA-256
- 47bd342fbc55c0147f8ec5bf2110a2aa08c333456a50e3cd99864d97a1d1d5c7
- Original
- No public link identified.