Use of Moneys in the Innovation and Technology Transportation Fund, Virginia Department of Transportation

Summary

Letter from Stephen C. Brich, Commissioner of Highways, to Governor Youngkin and the members of the General Assembly, submitting the 2024 report on the use of moneys in the Innovation and Technology Transportation Fund (ITTF) under Section 33.2-1531 of the Code of Virginia. It states that ITTF moneys are to be used solely for funding pilot programs and fully developed initiatives related to high-tech infrastructure improvements, meaning projects that reduce congestion, improve mobility, improve safety, provide up-to-date travel data, or improve emergency response. The report's project status summary shows 36 active projects valued at $117M as of August 31, 2024. It lists the Arlington County Dynamic Parking Pricing project at a project cost of $5,099,284.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Use of Moneys in the Innovation and Technology Transportation Fund, Virginia Department of Transportation.” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2024-rd937-e5af38d091/, SHA-256 149ed5bd78e2531110917eb263d886418bfe12d9635e8a84ac9c5c8daec5d669.

Full text

                          COMMONWEALTH of VIRGINIA
                             DEPARTMENT OF TRANSPORTATION
 Stephen C. Brich, P.E.                 1401 East Broad Street                        (804) 482-5818
 Commissioner                          Richmond, Virginia 23219                  Fax: (804) 786-2940

 December 1 7, 2024


 The Honorable Governor Glenn Youngkin
 Members of the Virginia General Assembly

 Dear Governor Youngkin and Honorable Members of the General Assembly:

 Section 33.2-1531 of the Code a/Virginia directs the Commissioner of Highways to report
 annually on the use of moneys in the Innovation and Technology Transportation Fund
 (ITTF). ITTF monies are to be used solely for the purposes of funding pilot programs and fully
 developed initiatives related to high-tech infrastructure improvements. The term "high-tech
 infrastructure improvements" pertains to projects or programs that reduce congestion, improve
 mobility, improve safety, provide up-to-date travel data, or improve emergency response.

 In accordance with§ 33.2-1531 of the Code a/Virginia, I am submitting the attached report to
 you which serves to report on the use of the moneys in the ITTF over the past year. If you
 have any questions, please do not hesitate to contact me at (804) 387-0037.


 Sincerely,



 Stephen C. Brich, P.E.
 Commissioner of Highways


 c:        The Honorable W. Sheppard Miller III
           G. Michael Fitch, Ph.D.
           Mr. E. Kevin Gregg


Attachment




                                         VirginiaDOT.org
                                    WE KEEP VIRGINIA MOVING
 TABLE OF                                  3   What is the ITTF

 CONTENTS
                                           4   ITTF Focuses




                                           5   Projects Status




                                           6   Project Updates




                                           9   Select Project Fact Sheets




                                          22   FY25 ITTF Projects




                                          40   Appendix


Cover Photo: Downtown Richmond Virginia
Section 33.2-1531 created the Innovation and Technology Transportation Fund (ITTF).
ITTF monies are to be used solely for the purposes of funding pilot programs and
fully developed initiatives pertaining to high-tech infrastructure improvements.
“High-tech infrastructure improvements” relate to projects or programs that reduce
congestion, improve mobility, improve safety, provide up-to-date travel data, or improve
emergency response.

Section 33.2-1531 of the Code of Virginia directs the Commissioner of Highways to report
annually on the use of monies in the Innovation and Technology Transportation Fund.




                                      3 | 2024 ITTF
ITTF Focuses
Per Code of Virginia Section 33.2-1531, ITTF projects must address one or more goals: reduce congestion, improve mobility, improve safety,
provide up-to-date travel data, and improve emergency response.

                                 The ITTF provides funding specifically for the purposes of funding pilot programs
                                and fully developed initiatives pertaining to high-tech infrastructure improvements:


          The ITTF program enhances
          road safety through innovative                                                                                         The ITTF program advances mobility
          technologies and strategies,                                                                                                  through investments in smart
                                                                         IMPROVING
          aligning with the agency’s                                       SAFETY                                                   infrastructure and transportation
          commitment to reducing crashes.                                                                                      innovation, creating a more connected
                                                                                                                            and accessible transportation network for
                                                                                                                                                  the Commonwealth.
                                                                                                        IMPROVING
                                                 IMPROVING                                               MOBILITY
                                                  TRAVELER
                                                INFORMATION
                                                                          ITTF
The ITTF program empowers
                                                                        PURPOSES
travelers with real-time updates on
road conditions, closures, and road
impacting events, facilitating more                                                                                       The ITTF program leverages technology
informed and efficient travel.                                                                                            and data-driven approaches to optimize
                                                                                                                              traffic flow, reduce bottlenecks, and
                                                                                                                                improve overall congestion for the
                                                                                              REDUCING                                             traveling public.
                                                            ENHANCING                        CONGESTION
                                                            EMERGENCY
                                                             RESPONSE

            The ITTF program integrates technology
            to expedite first responders’ access to
            incident information, to enable swift and
            effective responses to critical situations.


                                                                           4 | 2024 ITTF
                                                                                                    IMPROVING
                                                                                                      SAFETY




                                                                                                                       IMPROVING
                                                                                                                        MOBILITY
      ACTIVE PROJECTS                          ITTF FOCUS AREAS
                                                                                   IMPROVING
                                                                                    TRAVELER
                                                                                  INFORMATION
                                                                                                      ITTF
                                                                                                    PURPOSES
          as of August 31, 2024

    36                    $117M
Active Projects        Active Projects Value
                                                                                                                 REDUCING
                                                                                            ENHANCING           CONGESTION
                                                                                            EMERGENCY
                                                                                             RESPONSE



  COMPLETED PROJECTS                           PROJECT STATUS SUMMARY
     November 2023 – August 2024               The duration of each project varies based on its complexity. A simple ITTF project

                    18                         may be completed within a year. Complex projects may take multiple years to complete.

              Completed Projects



        NEW PROJECTS                                        7                               8                                20
    19                    $48M                         Scoping/Study                     Design                          Installation
   Projects               Projects Value

                                                    5 | 2024 ITTF
                PROJECT UPDATES
                This section features significant projects that have
                multi-year evaluations.




6 | 2024 ITTF
Arlington County
Dynamic Parking Pricing                                                                       Overview
                                                                                              Location             Arlington County
                                                                                              VDOT District        Northern Virginia
ITTF PURPOSES                                                                                 Route                US-1, Clarendon Blvd., Wilson Blvd., Fairfax Dr.
                                                                                              City/County          Arlington County
                                                                                              Category             Advanced Mobility Technology
                                                                                              Project Cost         $5,099,284
                                                                                                                   Installation completed 10/2023.
2024 UPDATE                                                                                   2024 Milestones      Evaluation extended to collect data through mid-2025.
„ VDOT and Arlington County are evaluating the Arlington County Dynamic                                            Report expected by October 2025.
   Parking Pricing.
„ The first two quarters consisted of a steady roll-out of the system, with
   growing use.                                                                               Roadway Characteristics: US-1 in Arlington (2023 data)
„ Four quarters of data will be collected to conduct the full evaluation.                     Annual Vehicle Hours of Delay                8,400



PROJECT DESCRIPTION
„ The Arlington County-managed project aims to implement a data-driven,
                                                                                              Benefits
   variable-pricing system and a traveler information system for parking on                   Focus           Metrics         Anticipated Results
   metered blocks in Arlington County’s two Metrorail corridors (Rosslyn-Ballston                             Vehicle Hours Lower delay with fewer repeated trips looking
                                                                                              Congestion
   and Pentagon City/Crystal City) and in up                                                                  of Delay(VHD) for parking
   to three County-owned, off-street parking                                                                  Increased     Reduced double parking will open travel
   areas within those corridors that are                                                      Congestion
                                                                                                              Road Capacity lanes
   regulated using parking meters.
                                                                                                              Increased
„ The system includes technology to detect
                                                                                                                            Public can access Arlington County website
                                                                                              Information     Parking
   parking space occupancy, integrate with                                                                                  about parking cost and availability
                                                                                                              Information
   the existing payment methods, and apply
   dynamic pricing for 4,563 metered on-street
   spaces and three off-street, paid-parking
   facilities in the two major Metrorail corridors
   in Arlington.
„ The project’s purpose is to improve the user
   experience with metered parking.




                                                                              7 | 2024 ITTF
I-95 Variable Speed Limit
(VSL) System                                                                                Overview
                                                                                            Location               I-95 in Spotsylvania County/City of Fredericksburg
                                                                                            VDOT District          Fredericksburg
ITTF PURPOSES                                                                               Route                  I-95
                                                                                            City/County            Fredericksburg, Spotsylvania, Caroline
                                                                                            Category               Advanced Roadway Technology
                                                                                            Project Cost           $2,404,000 (ITTF Funding for the I-95 VSL Algorithm)
                                                                                                                   Year 2 evaluation conducted.
2024 UPDATE                                                                                 2024 Milestones
                                                                                                                   Project complete.
„ VDOT’s Research Council continues to monitor the success of the I-95 VSL
   system, which continues to yield positive results.
                                                                                            Roadway Characteristics
Project Purpose                                                                                                                                                 2021
                                                                                            Crashes                     2023–2024       2022–2023
VDOT has installed variable speed limits on the I-95 northbound corridor between                                                                          Pre-Implementation
mile markers 115 and 130 in Caroline and Spotsylvania Counties. This is to address          Total Crashes                  247               286                  291
crashes caused by unexpected speed differentials when encountering congestion or
                                                                                            Fatal + Injury Crashes          51               58                    67
lane-impacting events. LED signs displaying variable speed limits between 35 mph
and the posted speed limit (65 or 70 mph), along with dynamic message boards,               Daily Traffic Volume        50K – 63K        49K - 57K             47K – 57K
provide real-time information to drivers. The speed limits are reduced only when
necessary based on traffic speed and volume data collected by vehicle detectors.
Enforcement authorities have access to real-time changes in the posted speed limits.        Benefits
Project Description                                                                         Safety 2023 – 2024
(ITTF Funded Portion for I-95 VSL)                                                          Total Crashes                -44 crashes from year prior to activation (-15.1%)
„ Develop the algorithms for the I-95 Variable Speed Limit technology.                      Fatal + Injury Crashes       -16 crashes from year prior to activation (-23.9%)
„ From 115 to 130 (15 miles), VSL is located on I-95 NB. It includes:                       Rear End Crashes             -58 crashes from year prior to activation (-32.5%)
   „ Algorithm Enhancements for Work Zones                                                  Mobility (based on data from 6 AM-8 PM)
   „ Automated Detector Monitoring and Alerts                                               In 2023-24, average travel times over the entire week have declined 6.3% versus
   „ Active System Management                                                               the year prior to VSL activation. Sunday average travel time has declined 14.8%.
   „ System Evaluation Support
                                                                                            In 2023-2024, reliability has improved by an average of 17.5% over the entire
Project Description                                                                         week.
(Other Funding Sources for I-95 VSL)
„ System integration
„ I-95 VSL Infrastructure (detectors, signs, cameras)


                                                                            8 | 2024 ITTF
                SELECT PROJECT
                FACT SHEETS
                Projects that have either:
                „ Completed scoping studies

                „ Completed the design phase

                „ Finished the installation



9 | 2024 ITTF
          Big Walker Mountain Tunnel (BWMT) and East River Mountain Tunnel

ITTF PURPOSES                                                        Overview
                                                                     Location              Mountain tunnels on I-77 at WV/VA border and near Bland/Wythe County line
                                                                     VDOT District         Bristol
                                                                     Route                 I-77
Description                                                          City/County           Bland County
                                                                     Category              Advanced Roadway Technology
„ Design of an automated traffic management control system
  to quickly and safely stop interstate traffic from entering the    Project Cost          Big Walker Mountain Tunnel                East River Mountain Tunnel
  tunnels during emergency closures or unplanned operational         Design                            $360,294 (ITTF)                            $603,611(ITTF)
  closures. System components include:                               Construction                     $8.5M (non-ITTF)                           $9.3M (non-ITTF)
  „ Dynamic message signs to alert traffic of the tunnel closure                           Completed design plans.
                                                                     2024 Milestones
  „ Variable speed limit signs and warning signs                                           Identified alternative funding sources for installation.
  „ Automatic gates, traffic signal, stop bar, alarm bells, and                            This project is being considered for Special Structures funding.
                                                                     Delivery Date
    cameras at the stopping point prior to the tunnel entrance                             Upon receiving funding, a delivery date will be defined.
  „ Manual gates at the nearby interstate on ramps                   Roadway Characteristics (2023 data)
  „ Design of median crossovers at the tunnel portals.
                                                                     Metrics                           Big Walker Mountain Tunnel      East River Mountain Tunnel
„ Deployment of advanced communication and tunnel closure
                                                                     Annual Vehicle Hours of Delay                95,858 (MM41-67) – I-77 and tunnels
  technologies will mitigate the impact of tunnel events. The
                                                                     Annual Cost of Delay                                 $4.01M (MM41-67)
  mountain tunnels have limited support resources due to their
  topography.                                                        Median Incident Duration          11 minutes                  34 minutes
                                                                     Daily Traffic Volume              15381                       16347
„ Installation funding is anticipated to be made available through
  VDOT’s Special Structures funding.                                 # Work Zones @ Tunnel             17                          4
                                                                     # Tunnel Incidents Requiring
                                                                                                       267                             6
                                                                     Lane Closures
                                                                     Benefits
                                                                     Focus           Metrics             Anticipated Results
                                                                                                         Fewer events
                                                                                     Secondary
                                                                     Safety                              Eliminates need for control room operator to leave post to
                                                                                     Incidents
                                                                                                         support interstate traffic closure
                                                                                     Vehicle Hours
                                                                     Congestion                          Reduction in VHD
                                                                                     of Delay (VHD)
                                                                     Emergency       Response Time       Shorter Incident Response Time
                                                                     Response        Clearance Time      Reduced Clearance Times

                                                                     Travel Data     # Notifications     Improved situational awareness with traffic stoppage alerts


                                                                     10 | 2024 ITTF
           Safety Data Analytics System

ITTF PURPOSES                                                                         Overview
                                                                                      Location             Statewide
                                                                                      VDOT District        Statewide
                                                                                      Route                N/A
Description                                                                           City/County          Statewide
                                                                                      Category             Furnish Travel Information
The purpose of this project was to develop a data system to support
transportation safety analytics projects. The project improves safety by              Project Cost         $2,183,578
facilitating analytics projects that will result in data-driven recommendations       2024 Milestones      Deployment completed.
for transportation safety improvements to:                                            Delivery Date        July 2024
„ Make timely, relevant, and trusted data and information available from the
   system of record in accessible formats to support decision making and              This pilot successfully highlighted the importance of easy data access across
   proactive communication to stakeholders and the public.                            different program areas within the agency. Since the commencement of this pilot,
„ Streamline workflows by reducing duplication of data, saving time
                                                                                      VDOT has initiated a systematic program for data mastering including:
   associated with data requests, and automating recurring reporting and              „ Declaring data as an asset in a Department Memorandum
   compliance-related activities.                                                     „ Developing a Master Data Roadmap
„ Reduce time spent tracking and validating data.
„ Maintain data security and confidentiality while improving transparency.
„ Combine data from disparate programs to facilitate pattern identification,          Projected Benefits
   promote insights, and improve reporting and visualizations.                        The pilot data system (called Transportation Data hub) is now available for use by
                                                                                      safety analytics projects.
                                                                                      It is anticipated that future analytics projects using the data system will yield
                                                                                      recommendations for transportation safety improvements. The pilot data system will
                                                                                      allow projects to gather needed data more efficiently. The pilot system can be used
                                                                                      to support development of various analytical tools:
                                                                                      „ MPO Safety Tool
                                                                                         Metropolitan regional and jurisdictional data-driven safety-planning and
                        TRANSPORTATION                                                   target-setting model based on crash-outcome, socio-economic, population,
                                                                                         travel, and resource-spending factors.
                        DATA HUB                                                      „ Systemic Tool
                                                                                         The Systemic Tool is a data-driven process based on analytical techniques to
                                                                                         identify widely dispersed, high-risk roadway features associated with target
                                                                                         collision types for fatal and serious injury crashes. Low-cost countermeasures
                                                                                         can then be broadly implemented across the system at those locations.




                                                                              11 | 2024 ITTF
           Regional Multi-Modal Mobility Program (RM3P) Northern Virginia Dynamic Incentivization

ITTF PURPOSES                                                                             Overview
                                                                                          Location                 Greater Northern Virginia
                                                                                          VDOT District            Northern Virginia
                                                                                          Route                    Multiple Routes
Description                                                                               City/County              District Wide
                                                                                          Category                 Advanced Mobility Technology
„ This project is part of the larger RM3P, which includes an AI-based
   Decision Support System, a Commuter Parking Information System, and                    Project Cost             $3,500,000
   a Data-Exchange Platform.                                                              2024 Milestones          Contract Awarded to Metropia in March 2024.
„ Dynamic Incentivization is a data-driven system that will incentivize drivers           Delivery Date            September 2026
   to modify their travel mode choices and behaviors based on real-time travel
   events and conditions impacting mobility in the Northern Virginia area.                Roadway Characteristics – All of Northern Virginia District
„ The incentives will be offered dynamically, when the transportation system              (2023 data)
   is congested, to encourage travelers to modify their travel modes and time of          Annual Vehicle Hours of Delay                   8M
   travel, thereby reducing the impact of adverse events and benefitting overall
   transportation network performance for all users.                                      Annual Vehicle Hours Cost of Delay              $216M
„ The incentives will be offered by regional agencies, business partners, and             Total # Incidents/Year                          3,564
   third-party providers. The incentives may include free or discounted consumer
                                                                                          Median Incident Duration                        28 minutes
   products, discounts on transportation costs, and opportunities to save for
   larger rewards.                                                                        Daily Traffic Volume                            Varies by road
„ The effort extends the incentivization concepts, previously used in Northern
   Virginia only during major construction projects, to responding day-to-day to          Benefits
   significant recurring and non-recurring congestion events.                             Focus          Metrics                         Anticipated Results
„ The Dynamic Incentivization project is jointly managed by the Virginia                                                                 Improved travel times with travel
   Department of Transportation and the Department of Rail & Public                                                                      behavior changes, reducing volumes
   Transportation.                                                                                       Travel Time Index
                                                                                                                                         A 3% - 10% improvement in reliability
                                                                                          Mobility
     Dynamic                     Project Partnering Agencies                                                                             with all RM3P projects
  Incentivization                                                                                        HOT/HOV Lane Use
                                                                                                                                         Increase in usage
                                                                                                         Transit Use
                                                                                                         Vehicle Hours of Delay          May be reduced from 132K to 700K
                                                                                                         (VHD)                           hours per year with all RM3P programs
                                                                                          Congestion
                                                                                                                                         Changes in volumes during peak periods
                                                                                                         Volume
                                                                                                                                         or events
                                         Regional TDM          Reward                                    # Incentives Used
                                                                                          Travel Data                                    Increased awareness
                                           Partners          Contributors                                # Users


                                                                                  12 | 2024 ITTF
           Regional Multi-Modal Mobility Program (RM3P) Commuter Parking Information System

ITTF PURPOSES                                                                               Overview
                                                                                            Location                 Greater Northern Virginia, Fredericksburg
                                                                                            VDOT District            Northern Virginia, Fredericksburg
                                                                                            Route                    Multiple Routes
Description                                                                                 City/County              District Wide
                                                                                            Category                 Advanced Mobility Technology
„ The Parking project is part of the larger Regional Multi-Modal Mobility
   Program (RM3P), which includes an AI-based Decision Support System,                      Project Cost             $2,800,000
   Dynamic Incentivization, and a Data-Exchange Platform.                                                            Contract Awarded to ParkZen in August 2024.
                                                                                            2024 Milestones
                                                                                                                     Launch Proof-of-Concept Phase in November 2024.
„ The Commuter Parking Information System (CPIS) will provide a real-time,
   app-based parking information system that provides reliable information about                                     The three-year service will initially become available in early
   parking availability at lots serving bus, vanpool, and carpool commuters.                Delivery Date            2025 and it will be rolled out incrementally over the next 2-3
                                                                                                                     years as more lots are deployed.
„ The CPIS will use crowd-sourcing technology that does not require additional
   infrastructure at individual parking lots.                                               Roadway Characteristics – All of Northern Virginia District
„ Ultimately, the project will provide occupancy data at more than 50 commuter              (2023 data)
   parking lots in Northern Virginia and Fredericksburg. The system will be                 Annual Vehicle Hours of Delay                    8M
   scalable to additional parking facilities under the terms of a cooperative
   purchasing agreement.                                                                    Annual Vehicle Hours Cost of Delay               $216M

„ Initially, the project will be rolled out to six commuter parking lots during a           Total # Incidents/Year                           3,564
   six-month proof-of-concept phase, during which the technology will be tested             Median Incident Duration                         28 minutes
   and validated. If the proof-of-concept is successful, the technology will then
   be deployed at the remaining parking lots.                                               Daily Traffic Volume                             Varies by road
„ Nearly 40 partners and stakeholders are supporting VDOT in the CPIS
   initiative, including VRE, WMATA, MWCOG, NVTA, FAMPO, and numerous                       Benefits
   counties and cities.                                                                     Focus           Metrics                          Anticipated Results
 Commuter Parking                                                                                                                            Improved travel times with travel behavior
Information System                                                                                                                           changes, reducing volumes
                                                                                            Mobility        Travel Time Index
                                                                                                                                             A 3% - 10% improvement in reliability
                                                                                                                                             with all RM3P projects
                                                                                                            Vehicle Hours of Delay           May be reduced from 132K to 700K
                                                                                                            (VHD)                            hours per year with all RM3P programs
                                                                                            Congestion                                       Increase in commuter lot use –
                                                                                                            Commuter Parking Lot
                                                                                                                                             reduction in overall single-occupant
                                                                                                            Usage
                                                                                                                                             vehicles
                                                                                                                                             Increased awareness of parking
                                                                                            Travel Data     # system users
                                                                                                                                             availability at commuter lots


                                                                                    13 | 2024 ITTF
           Animal Detection Warning System Study

ITTF PURPOSES                                                                           Overview
                                                                                        Location                 Southwest Virginia
                                                                                        VDOT District            Bristol
                                                                                        Route                    U.S. 460 (Kentucky state line to Grundy)
Description                                                                             City/County              Buchanan County
                                                                                        Category                 Advanced Roadway Technology
„ Study focused on the feasibility of using animal detection and driver warning
   systems with an emphasis on preventing elk strikes along Route 460 in                Project Cost             Study - $170K; Pilot Project - $640K
   Buchanan County. The population of elk is increasing in this area of Virginia                                 Study completed August 2024.
                                                                                        2024 Milestones
   after being reintroduced by the Virginia Department of Wildlife Resources                                     Pilot project scheduled.
   between 2012 and 2014.                                                               Delivery Date            December 2026
„ Findings of the study indicate that a pilot test would be feasible on Route
   460. Several potential technologies were identified, including radar, short
   and long-range thermal cameras, and buried cable systems.                            Roadway Characteristics
„ A reduction in animal-vehicle collisions may occur when similar animal                (2023 data for identified route above)
   detection technologies are introduced.                                               Daily Traffic Volume                            3,458
                                                                                        Total # Animal Strikes/Year                     6
                                                                                        Total # Incidents/Year                          60




                                                                                        Benefits
                                                                                        Focus                    Metrics                    Anticipated Results
                                                                                                                 Animal Collisions          Fewer events
                                                                                        Safety
 Photo Credit: Nicholas Huff                                                                                     Secondary Incidents        Fewer events

                                                                                        Travel Data              # Notifications            Improved situational awareness




 Photo Credit: Mark Hill


                                                                                14 | 2024 ITTF
          Real Time Information for Commercial Vehicles

ITTF PURPOSES                                                                          Overview
                                                                                       Location              Statewide
                                                                                       VDOT District         Statewide
                                                                                       Route                 Statewide
Description                                                                            City/County           District Wide
                                                                                                             Advanced Mobility Technology
„ Independent data providers have developed travel information apps,                   Category
                                                                                                             Commercial Vehicles
  including those for the commercial vehicle (CV) industry.
                                                                                       Project Cost          $1,000,000
„ Advanced warning information about upcoming stopped travel queues and
                                                                                                             VDOT sponsored pilot test of data.
  advance congestion warning may enable commercial vehicles to adjust their            2024 Milestones
                                                                                                             Commercial Vehicle Safety Alerts (Drivewyze) data from INRIX.
  routes or speeds in a timely manner, which may prevent rear-end collisions
  or commercial vehicle volumes on congested highways.                                                       Awarded contract task order to provide service through
                                                                                       Delivery Date
                                                                                                             January 2025.
„ VDOT and other states along the east coast are participating in purchasing
  a service with a third-party commercial vehicle information app. This
  VDOT-paid service sponsors the inclusion of free stopped queue and
  congestion alerts to commercial vehicles using the Electronic Logging                Roadway Characteristics – All Interstates (2023 data)
  Device (ELD) feature from Drivewyze, a 3rd party app.                                Number of tractor trailer crashes             7,336
„ Through Drivewyze, the Commercial Vehicle Safety Alerts service aims to              Annual vehicle hours of delay                 17.7M
  reduce crashes and fatalities related to secondary crashes, work zones, and
  emergency events. This is accomplished by leveraging existing capabilities
  in a novel way to provide real-time alerts to trucks on their ELD and mobile         Benefits
  apps that are traveling on certain Virginia corridors and locations.                 Focus           Metrics                  Anticipated Results
„ The Virginia Transportation Research Council will complete an evaluation of                                                   Fewer rear-end collisions as commercial
                                                                                       Safety          Reduction in Crashes
  service’s impact on mobility and safety.                                                                                      vehicles are warned of approaching queues
                                                                                                                                Improved reliability with less delay caused
                                                                                       Mobility        Travel Time Index
                                                                                                                                by incidents
                                                                                                                                Less delay with fewer incidents by
                                                                                                       Vehicle Hours of Delay
                                                                                       Congestion                               preventing rear-end collisions & providing
                                                                                                       (VHD)
                                                                                                                                rerouting opportunities

                                                                                       Travel Data     # Notifications          Increased usage of travel information apps




                                                                               15 | 2024 ITTF
          I-664 / Route 17 Corridor Management Phase I – Development

ITTF PURPOSES                                                                          Overview
                                                                                                              I-664 Corridor between US 17 in Suffolk to Warwick Blvd in
                                                                                       Location
                                                                                                              Newport News
                                                                                       VDOT District          Hampton Roads
                                                                                       Route                  US 17, US 60 (Warwick Boulevard), I-664
Description
                                                                                       City/County            Newport News, Suffolk
„ A corridor management program will provide greater tools to manage traffic
                                                                                       Category               Advanced Roadway Technology
  with changing volumes due to incidents. In Newport News and Suffolk, traffic
  patterns may change when incidents occur on one of the two James River               Project Cost           $118,280
  Crossings (US 17 and I-664).                                                                                Scoping completed April 2024.
                                                                                       2024 Milestones
                                                                                                              Project advancing to design.
„ The planned system includes advanced traffic signal technology to provide
  longer green cycles during incidents, message signs to promote re-routing,           Delivery Date          September 2025
  camera monitoring systems, and traffic detectors. Together, these tools will
  enable VDOT to manage the travel corridor between Newport News and Suffolk.          Roadway Characteristics (2023 data)
                                                                                                                            I-664           US 17 (I-664 – US 60       US 60
                                                                                       Metrics
                                                                                                                         (Exit 5 – 9)          Warwick Blvd)       (US 17 – I-664)
                                                                                       Annual Vehicle Hours of Delay        468K                    80K                   6.3K
                                                                                       Annual Cost of Delay                $19.6M                  $3.3M                 $264K
                                                                                       # Incidents                         1,419                    479                   N/A
                                                                                       Median Incident Duration          14 Minutes             15 Minutes                N/A
                                                                                       Daily Traffic Volume                32,262                 24,890                 12,890

                                                                                       Benefits
                                                                                       Focus           Metrics                          Anticipated Results
                                                                                       Safety          Secondary Incidents              Fewer events
                                                                                                                                        May provide a 3% - 10% improvement
                                                                                       Mobility        Travel Time Index
                                                                                                                                        in reliability
                                                                                                       Vehicle Hours of Delay           May be reduced from 8K to 45K hours
                                                                                       Congestion
                                                                                                       (VHD)                            per year
                                                                                                                                        Faster detection with increased camera
                                                                                       Emergency       Incident Detection Time
                                                                                                                                        monitoring
                                                                                       Response
                                                                                                       Incident Response Time           Shorter Incident Response Time

                                                                                       Travel Data     # Notifications                  Improved situational awareness



                                                                               16 | 2024 ITTF
          Route 288 Hard Shoulder Running

ITTF PURPOSES                                                                        Overview
                                                                                     Location               Greater Richmond
                                                                                     VDOT District          Richmond
                                                                                     Route                  288
Description                                                                          City/County            Goochland, Powhatan
                                                                                     Category               Advanced Roadway Technology
„ Deployment of Intelligent Transportation System (ITS) infrastructure and
  necessary pavement improvements to implement the use of Hard Shoulder              Project Cost           $26,298,570 ITTF & $8,000,000 CVTA funds
  Running (HSR) on State Route 288 northbound between Route 711                                             Preliminary scoping completed.
                                                                                     2024 Milestones
  (Huguenot Trail) in Powhatan County and Route 6 (Patterson Avenue), in                                    Concept of operations completed, May 2023.
  Goochland County.                                                                  Delivery Date          April 2028
„ Technologies include lane control, traffic detectors, message signs,
  automated incident detection cameras, and changeable speed limit signage.
„ The HSR will provide additional capacity during peak travel periods.
                                                                                     Roadway Characteristics – Patterson Ave to Robious Rd
                                                                                     (2023 data)
                                                                                     Annual Vehicle Hours of Delay                18K
                                                                                     Annual Cost of Delay                         $536K
                                                                                     Median Incident Duration                     48 minutes
                                                                                     Daily Traffic Volume                         52,253


                                                                                     Benefits
                                                                                     Focus           Metrics                     Anticipated Results
                                                                                                     Secondary Incidents         Fewer events
                                                                                     Safety
                                                                                                     Crash Rates                 Fewer events

                                                                                     Mobility        Travel Time Index           Improved Travel Time Index

                                                                                                     Vehicle Hours
                                                                                     Congestion                                  Reduction in VHD
                                                                                                     of Delay (VHD)
                                                                                     Emergency       Incident Detection Time     Faster Incident Detection Time
                                                                                     Response        Incident Response Time      Shorter Incident Response Time




                                                                             17 | 2024 ITTF
          Advanced Work Zone Technology

ITTF PURPOSES                                                                        Overview
                                                                                                            Two test sites located in the Staunton District (I-81 SB at
                                                                                     Location
                                                                                                            MM 288-294) and in the Culpeper District (I-66 WB at MM 32).
                                                                                     VDOT District          Culpeper, Staunton
                                                                                     Route                  I-81 SB at MM 288-294 and I-66 WB at MM 32
Description
                                                                                     City/County            Fauquier, Shenandoah
„ Zipper Merge with Queue Warning Systems is an advanced work zone
                                                                                     Category               Advanced Roadway Technology
  safety strategy. This system notifies motorists using portable message
  signs and traffic sensors of stopped or slow traffic based on the travel           Project Cost           $600,000
  speed leading up to the work zone. It also directs the motorist to use both        2024 Milestones        Pilot tests completed.
  travel lanes until reaching a defined merging point, and then alternate                                   The evaluation report is under review through the National
  vehicles in a zipper manner into the open travel lane.                              Delivery Date         Cooperative Highway Research Program for release by
                                                                                                            August 2025.
„ The Zipper Merge with Queue Warning Systems can reduce the length of
  work zone backups by as much as 40%.
„ VDOT piloted a Zipper Merge and Queue Warning Systems on a bridge
  rehabilitation site on southbound I-81, south of the Tom’s Brook interchange.
  VDOT plans to test the Zipper Merge and Queue Warning Systems strategy
  at other locations and prepare an evaluation of the project.
                                                                                     Roadway Characteristics – Interstate Highway System
                                                                                     # Incidents                                                   138,494
                                                                                     # Work Zone Incidents                                            3,018



                                                                                     Benefits
                                                                                     Focus            Metrics                      Anticipated Results
                                                                                                      Reduced Collisions
                                                                                                                                   Fewer events
                                                                                                      in Work Zones
                                                                                     Safety
                                                                                                      Reduced Collisions in
                                                                                                                                   Fewer events
                                                                                                      Traffic Queues

                                                                                     Mobility         Travel Time Index            Improved travel time reliability

                                                                                                      Vehicle Hours
                                                                                     Congestion                                    Reduction in VHD
                                                                                                      of Delay (VHD)




                                                                             18 | 2024 ITTF
          Transportation Technologies Identity and Access Management

ITTF PURPOSES                                                                      Overview
                                                                                   Location              Statewide Tool
                                                                                   VDOT District         Statewide
                                                                                   Route                 N/A
Description                                                                        City/County           N/A
                                                                                   Category              Advanced Transportation Technologies
„ Traveler information and traffic management systems are dependent
  on reliable data.                                                                Project Cost          $1,361,000
                                                                                                         Implemented system.
„ VDOT operates over 10,000 transportation technology devices, such                2024 Milestones
                                                                                                         Evaluation underway.
  as traffic cameras, traffic data monitors, message signs, etc. VDOT
  also provides real-time information to the public via 511 and alerts.            Delivery Date         Evaluation report is expected by October 2025.
  Third-party travel information providers also use VDOT data.
„ Multiple parties have operation and maintenance roles to keep the                Benefits
  transportation technology devices functioning reliably and accurately.           Focus           Metrics                 Anticipated Results
„ An identity and access management system with new associated                                                             Reduce from average of 4 business days to
  processes was deployed to improve security for VDOT’s transportation                             Time to provision       provision to under 1 business day to provision
  technology environment (network, systems, devices, etc.), which will:                            to get travel data      account and other required access and
                                                                                                                           permissions
  „ Provide greater automation and efficiencies in the provisioning
     of access to key traffic operations systems and other assets                  Travel data                             The identity access management system
  „ Reduce errors when access is provisioned, which will improve
                                                                                                   Accuracy of identity,   and corresponding process updates are now
                                                                                                   account, and system     enforcing input of accurate user/identity
     system security
                                                                                                   access                  attributes and other associated information
  „ Improve ongoing monitoring of accounts and access to meet                                                              with minimal data quality issues
     security policy objectives
  „ Ensure privileged access requirements are being met
  „ Improve system reliability




                                                                           19 | 2024 ITTF
                Automated Traffic Signal Performance Measures (ATSPM) Program – Foundational Projects

  ITTF PURPOSES
                                                                                                                                             Overview
                                                                                                                                             Location                                                   Statewide
                                                                                                                                             Category                                                   Signal Detection Upgrades
  Description                                                                                                                                Foundation Projects Cost                                   $8,131,000
                                                                                                                                                                                                        Eight foundational projects completed.
  „ VDOT has a master plan to implement advanced technologies based
     on the ATSPM.                                                                                                                           2024 Milestones                                            7 remaining projects are in the design or
                                                                                                                                                                                                        installation phase.
  „ ATSPM will offer VDOT the ability to manage its traffic signal program
     proactively by updating signal retimings based on performance and data.                                                                 Delivery Date                                              ATSPM targeted completion is December 2025.

  „ In order to advance ATSPM, VDOT must provide foundational
     projects such as: high speed communications to the signals,
     advanced traffic controllers, and ATSPM Software.
                                                                                                                                              Benefits – for the complete ATSPM Program
                                                                                                                                              Focus             Metrics                                              Anticipated Results
  „ VDOT established multiple projects to advance the ATSPM. The
     following table defines the foundational projects completed in 2023.                                                                     Safety            Collisions                                           Reduced number and reduced severity
  „ The ATSPM’s full deployment is funded by multiple funding sources.
                                                                                                                                              Mobility          Travel Time Reliability                              Improved reliability with vehicle detection
  „ The VDOT Central Signal System will benefit from these real-time
     data communication projects.                                                                                                                               Vehicle Hours
                                                                                                                                              Congestion                                                             Less delay waiting for traffic lights
                                                                                                                                                                of Delay (VHD)
                                                                                                                                              Emergency                                                              First responders able to reach incidents
                                                                                                                                                                Incident Duration
                                                                                                                                              Response                                                               faster with emergency vehicle preemption
                                                                                                                                                                Information for                                      Increased real-time intersection operation
                                                                                                                                              Information
                                                                                                                                                                Connected Vehicles                                   data without additional cost
 Benefits – for the foundational projects
Statewide Traffic Signal System Status
                         January 2022                                                                                                              Statewide Traffic SignalSeptember
                                                                                                                                                                            System 2024
                                                                                                                                                                                     Status
                                                                                                        50%                                                                                                                                                    50%



  3,137 Traffic Signals Statewide
                                                                                                                      58%                                3,184 Traffic Signals Statewide
       High Speed Communications (2506 – 80%)                                                                                         With ITTF                                                                                 33%
                                                                                                                                                              High Speed Communications (3064 – 96%)
       ATC / D4 Migration (2808 – 90%)                                                                                                and Other               ATC / D4 Migration (3184 – 100%)
       KITS Deployment (Configured – 2915 – 93%)                           25%                                               75%                                                                                                                                                       73%
                                                                                                          80%                          Funding                KITS Configured (3184 – 100%)
                                                                                                                                                              KITS Live (3064 – 96%)
                                                                                                                                                                                                                              25%
                                                                                                                                                                                                                                                                96%
                                                                                                                                                                                                                                                                                           75%

       KITS Deployment (Live – 1829 – 58%)
       ATSPM (Active – 196 – 6%)                                                                          90%                                                 ATSPM Configured (2314 – 73%)
                                                                                                                                                              ATSPM Active (1043 – 33%)
                                                                                                                                                                                                                                                               100%
                                                                                                         93%                                                                                                                                                    100% 96%
                                                                                            6%
                                                                                                    100%                                                                                                                                                      100%




                                                                                                                                                                       Virginia Department of Transportation   Courtesy: Traffic Operations / Mike Clements           Updated: 9/27/2024         1
                Virginia Department of Transportation   Courtesy: Traffic Engineering / Mike Clements           Updated: 1/31/2022    1


                                                                                                                                     20 | 2024 ITTF
        ATSPM Program – Foundational Projects Completed

2024 ATSPM Program – Foundational Projects Completed
 #   Project Name                                                Description                                                                        Date Completed

                                                                 Installed updated cabinets and infrastructure at signals along Route 1
 1   Signal Technology: Route 1                                                                                                                     January 2024
                                                                 in Fredericksburg District.


                                                                 Installed fiber optic lines to support advanced signal strategies along Route 1
 2   Fiber Communication for Signals: Route 1                                                                                                       January 2024
                                                                 in Spotsylania County.


                                                                 Installed fiber optic lines to support advanced signal strategies at multiple
 3   Fiber Communications for Signals: Staunton District                                                                                            February 2024
                                                                 locations in VDOT’s Staunton District.


                                                                 Installed fiber optic lines to support advanced signal strategies along Route 234
 4   Fiber Communications for Signals: Route 234                                                                                                   March 2024
                                                                 in Prince William County.


                                                                 Installed fiber optic lines to support advanced signal strategies along Route 50
 5   Fiber Communications for Signals: Route 50                                                                                                     March 2024
                                                                 in Fairfax County.


                                                                 Installed updated cabinets and infrastructure at signals along Route 1
 6   Signal Technology: Route 1                                                                                                                     March 2024
                                                                 in Stafford County.


                                                                 Installed fiber optic lines to support advanced signal strategies
 7   Fiber Communications for Signals: Richmond District                                                                                            April 2024
                                                                 at multiple locations in VDOT’s Richmond District.


                                                                 Installed fiber optic lines to support advanced signal strategies
 8   Fiber Communications for Signals: Fredericksburg District                                                                                      April 2024
                                                                 at multiple locations in VDOT’s Fredericksburg District.




                                                                          21 | 2023 ITTF
                 FY25 ITTF
                 PROJECTS


22 | 2024 ITTF
(T-UPC: T-29233)
                        Big Walker Mountain Tunnel (BWMT): Permanent Tunnel Work Zone / Lane Closure Technology
verview                                                         Existing Characteristics (2023)                             ITTF Evaluation Ratings
             ITTF PURPOSES                                                            Overview
                                        Bristol District                                                                    Overall
                                                                 Vehicle Hours of Delay           Location14,000           Big WalkerProject Rating
                                                                                                                                       Mountain Tunnel                 70
Closure Technology
tact         Sean Grinnell, Aleia Warren                         Cost of Delay                         $592,000
                                                                                                  VDOT District             Projected Value-to-Cost Ratio
                                                                                                                           Bristol                                     3.1
ext                                               Rural          Total Crashes                    Route       30         I-77
                                                                                                                           Impact                                Medium
             Description                             I-77                                         City/County            Bland County
                                                                      VMT                             19,431,000           Innovation                            Medium
                                                                                                                         Autonomous Truck Mounted Attenuator
es           „ This project uses innovative  solutions
                                          Bland  Countyfor managingTravel
                                                                       frequent laneIndex
                                                                             Time     closures                             Complexity                            Medium
                                                                                                    Innovative 1.21
                                                                                                               Elements Smart  Work Zone Technology
st Existing Characteristics                         (2023)                 ITTF Evaluation Ratings Automated Flagger Device
                at BWMT,  which  happened   434  times  in 2022  due  to maintenance,   debris
                                             $2,250,000
                removal, and emergencies.                            Innovative Elements Project Cost                    $2,250,000
ation (PE & Hours
            CN)                              48 Months                     Overall
   Vehicle         of Delay
             „ Current                                14,000
                        methods involve a manual system     where atunnel   control Project
                                                                         Autonomous      TMA Rating 2024
                                                                                      room            Smart   work  zone   70           Automated
                                                                                                                                       Six            flaggerProgram
                                                                                                                                                                device
                                                                                                          Milestones     Added to VDOT’s    Year Improvement
                operator physically closes the lane. Potential solutions to be considered include      technology
   Cost of Delay                                   $592,000                Projected Value-to-Cost Ratio
                using an autonomous Truck Mounted Attenuator (TMA), smart work zone                 Delivery Date         3.1
                                                                                                                         December 2026
              connected technology, or an automated flagger
  Total Crashes                                        30 device. Impact                                           Medium
  VMT                                         19,431,000             Innovation                   Roadway Characteristics
                                                                                                            Medium        (2023 data)
                                                                                                                     I-77 (MM41–67)
  Travel Time Index                                    1.21          Complexity                                    Medium
                                                                                                  Annual Vehicle Hours of Delay               92K
  Innovative Elements                                                                             Annual Cost of Delay                        $3.8M

   Autonomous TMA                         Smart work zone                         Automated flagger device                  BWMT (Tunnel Only)
                                            technology                                            Annual Vehicle Hours of Delay               11K
                                                                                                  Annual Vehicle Hours Cost of Delay          $458K
                                                                                                  Total # Incidents/Year                      29
                                                                                                  Average Daily Traffic Volume                15,381                         5




                                                                                                  Benefits
                                                                                                  Focus          Metrics                      Anticipated Results
                                                                                                                                              Automating the lane-closure process
                                                                                                  Safety         Collisions                   improves the safety of both responders
                                                                                                                                              and the traveling public
                                                                                                  Emergency      Response Time                Automating the lane-closure process
                                                                                                  Response       Clearance Time               improves response time



                                                                                       23 | 2024 ITTF
                                                                                                                                  5
           I-77 Traffic Queue Detection

ITTF PURPOSES                                                                        Overview
                                                                                     Location                 Southwestern Virginia Interstates
                                                                                     VDOT District            Bristol, Salem
                                                                                     Route                    I-77 (from I-81 to West Virginia State Line)
Description                                                                          City/County              Multiple
                                                                                     Innovative Elements      Queue Detection
„ This project is to implement a Traffic Queue Detection system on I-77 that
   alerts travelers about traffic congestion and provides estimated arrival times    Project Cost             $1,700,000
   through existing dynamic message signs.                                           2024 Milestones          Added to VDOT’s Six Year Improvement Program
„ The system can be localized to tunnel vicinities or extended to the I-81/I-77      Delivery Date            December 2026
   corridors in the District.

                                                                                     Roadway Characteristics – I-77 from I-81 to the
                                                                                     West Virginia State Line (2023 data)
                                                                                     Annual Vehicle Hours of Delay                94K
                                                                                     Annual Vehicle Hours Cost of Delay           $3.9M
                                                                                     Total # Incidents/Year                       754
                                                                                     Average Daily Traffic Volume                 14,936




                                                                                     Benefits
                                                                                     Focus          Metrics                       Anticipated Results
                                                                                                                                  Advance queue detection and warning
                                                                                     Safety         Collisions
                                                                                                                                  improves safety
                                                                                                    Vehicle Hours                 Advance queue detection and warning
                                                                                     Congestion
                                                                                                    of Delay (VHD)                mitigates congestion
                                                                                                                                  Improving informational alerts to
                                                                                                    # Response Plans
                                                                                     Travel Data                                  travelers regarding anticipated queuing
                                                                                                    # Notifications
                                                                                                                                  is the primary objective



I-77 Northbound traffic heatmap



                                                                             24 | 2024 ITTF
                        Big Walker Mountain Tunnel (BWMT): Tunnel Thermal Detection
aracteristics (2023)                  ITTF Evaluation Ratings
             ITTF PURPOSES                                                                             Overview
 elay              14,000  Overall Project Rating                                 78                   Location                  Big Walker Mountain Tunnel
                   $592,000           Projected Value-to-Cost Ratio               8.9                  VDOT District             Bristol
                                      Impact                                     Low                   Route                     I-77
                          30
             Description                                                                               City/County               Bland
               19,431,000             Innovation                                 Low
                                                                                                                                 Thermal Detection Cameras
             „ This project is to install fiber optic detection technology with supporting             Innovative Elements
                        1.21          Complexity                                 Low                                             Fiber-based Thermal Detection System
el Thermal Detection        (UPC 125208)
           thermal detection cameras within the tunnels at BWMT to more effectively
                                                                                                       Project Cost              $875,000
           detect vehicle fires.
                                                                                                       2024 Milestones           Added to VDOT’s Six Year Improvement Program
             „ This will replace the current system where a control room operator manually
                monitors CCTV footage for signs of smoke and crashes. The                              Delivery Date             December 2026
                                                     Existing
                new system will offer greater reliability and        Characteristics
                                                              faster fire detection.           (2023)            ITTF Evaluation Ratings
                          Bristol District                                                                  Overall Project Rating
                                                     Vehicle Hours of Delay                      14,000Roadway Characteristics     (2023 data) 78
            Sean Grinnell, Aleia Warren                                                                          Projected Value-to-Cost
                                                     Cost of Delay                             $592,000                             I-77Ratio
                                                                                                                                         (MM41–67) 8.9
                                    Rural            Total Crashes                                              Impact
                                                                                                     30Annual Vehicle                                         Low
                                                                                                                      Hours of Delay                 92K
                                     I-77            VMT                                                        Innovation
                                                                                             19,431,000Annual Cost of Delay                                   Low
                                                                                                                                                     $3.8M
                          Bland County               Travel Time Index                             1.21         Complexity                                    Low
                                $875,000
                                                                                                                                     BWMT (Tunnel Only)
                                                                                                       Annual Vehicle Hours of Delay                 11K
CN)                            18 Months
                                                                                                       Annual Vehicle Hours Cost of Delay            $458K
                                                                                                       Total # Incidents/Year                        29
                                                                                                       Average Daily Traffic Volume                  15,381
 nts                                                                                    9

meras
 etection system
                                                                                                       Benefits
                                                                                                       Focus           Metrics                       Anticipated Results
                                                                                                                                                     Enhanced ability to detect vehicle fires
                                                                                                       Safety          Collisions                    and inform first responders leads to
                                                                                                                                                     improved traveler safety
                                                                                                                                                     Enhanced ability to detect vehicle fires
                                                                                                       Emergency       Response Time
                                                                                                                                                     and inform first responders leads to
                                                                                                       Response        Clearance Time
                                                                                                                                                     improved incident response

                                                                                                                                                                    9

                                                                                             25 | 2024 ITTF
(T-UPC: T-29233)
                          Big Walker Mountain Tunnel (BWMT): Hazardous Materials Placard Reader
verview                                                            Existing Characteristics (2023)                              ITTF Evaluation Ratings
              ITTF PURPOSES                                                              Overview
                                          Bristol District                                                                      Overall
                                                                   Vehicle Hours of Delay             Location14,000           Big WalkerProject Rating
                                                                                                                                          Mountain Tunnel                  70
tact                         Sean Grinnell, Aleia Warren           Cost of Delay                           $592,000
                                                                                                      VDOT District             Projected Value-to-Cost Ratio
                                                                                                                               Bristol                                     3.1
ext                                                 Rural          Total Crashes                  Route        30     I-77
                                                                                                                        Impact                                Medium
             Description                              I-77                                        City/County         Bland
                                                                      VMT                             19,431,000        Innovation                            Medium
                                                                                                  Innovative Elements Computer Vision
es           „ This project will install hazardous   material (HAZMAT)
                                           Bland County                   placard
                                                                      Travel Time readers
                                                                                   Index in the              1.21       Complexity                            Medium
                                                                                                  Project Cost        $875,000
st(UPC 125206)
                BWMT   to identify and  classify the type  of hazardous  material transported  at
                                             $2,250,000
                any given time.                                      Innovative Elements 2024 Milestones              Added to VDOT’s Six Year Improvement Program
ation (PE & CN)                              48 Months                                            Delivery Date       December 2026
             „ The readers, which have been tested with a 96-99%     accuracy
                                                                        Autonomous  rate,TMA
                                                                                          will      Smart work zone                Automated flagger device
                provide essential information during accidents. Approximately 300+ HAZMAT             technology
   Existing vehicles use
                Characteristics             (2023)
                             the tunnel daily.                 ITTF Evaluation Ratings
             „ The
   Vehicle Hours    project is an extension of
                 of Delay                      the completedOverall
                                            14,000           Virginia Tech Rating
                                                                    Project Transportation            Roadway Characteristics (2023 data)
                                                                                                        86
                   Institute/VDOT Transportation Research Council research projects.
   Cost of Delay                           $592,000          Projected Value-to-Cost Ratio              9.8                           I-77 (MM41–67)
   Total Crashes                                  30         Impact                                  Annual Vehicle Hours of Delay
                                                                                                   Medium                                         92K
   VMT                                   19,431,000          Innovation                            Medium
                                                                                                     Annual Cost of Delay                         $3.8M
   Travel Time Index                            1.21         Complexity                                Low                         BWMT (Tunnel Only)
   Innovative Elements                                                                                Annual Vehicle Hours of Delay               11K
       Computer vision                                                                               Annual Vehicle Hours Cost of Delay          $458K
                                                                                                      Total # Incidents/Year                      29
                                                                                                      Average Daily Traffic Volume                15,381
                                                                                                                                                                                 5



                                                                                                      Benefits
                                                                                                      Focus          Metrics                      Anticipated Results
                                                                                                                                                  Improved safety resulting from
                                                                                                      Safety         Collisions                   enhanced situational awareness of
                                                                                                                                                  HAZMAT from proposed technology
                                                                                                                                                  Improved incident response
                                                                                                      Emergency      Response Time                resulting from enhanced first responder
                                                                                                      Response       Clearance Time               situational awareness of HAZMAT from
                                                                                                                                                  proposed technology

                                                                                                              11

                                                                                             26 | 2024 ITTF
          Statewide Sidewalk and Crosswalk Management Tool

ITTF PURPOSES                                                                          Overview
                                                                                       Location                  Statewide
                                                                                       VDOT District             Statewide
                                                                                       Route                     Multiple
Description                                                                            City/County               Multiple
                                                                                                                 Remote Sensing Technology
„ This project intends to use innovative aerial/remote sensing technologies
                                                                                       Innovative Elements       Machine Learning
  combined with automated sensing to create an inventory of sidewalk
                                                                                                                 Interactive Map
  facilities and crosswalks across Virginia, displayed in an interactive map
  format for public access.                                                            Project Cost              $350,000
                                                                                       2024 Milestones           Added to VDOT’s Six Year Improvement Program
„ This comprehensive data, including sidewalk width, crosswalk presence,
  length of each feature, and maintenance responsibility, will aid in travel           Delivery Date             March 2026
  planning, identify infrastructure gaps, assist in pedestrian trip forecasting,
  inform ADA compliance, and improve overall safety and mobility for all modes.        Roadway Characteristics (2023 data)
                                                                                       Confirmed Miles of Sidewalk                          4,078
                                                                                       Estimated Miles of Sidewalk                          20,000+
                                                                                       Total Pedestrian Crashes                             1,540
                                                                                       Total Pedestrian Killed or Seriously Injured (KSI)
                                                                                                                                            550
                                                                                       Crashes



                                                                                       Benefits
                                                                                       Focus           Metrics                        Anticipated Results
                                                                                                                                      Improved understanding of pedestrian
                                                                                       Safety          Collisions                     facilities will reduce infrastructure gaps
                                                                                                                                      leading to safer pedestrian networks
                                                                                                       Response Time                  Mobility benefits from resultant
                                                                                       Mobility
                                                                                                       Clearance Time                 investments in pedestrian facilities
                                                                                                                                      The primary purpose of this project
                                                                                                       # Response Plans               is to improve the collection and
                                                                                       Travel Data
                                                                                                       # Notifications                dissemination of data related to
                                                                                                                                      pedestrian facilities statewide




                                                                               27 | 2024 ITTF
          Statewide Transportation Technology Fiber Communication Deployment

ITTF PURPOSES                                                                        Overview
                                                                                     Location                   Statewide
                                                                                     VDOT District              Statewide
                                                                                     Route                      Multiple
Description                                                                          City/County                Multiple
                                                                                                                ATSPM Expansion
„ The project seeks to expand the buildout of state-owned fiber to connect           Innovative Elements
                                                                                                                CAV Applications
  priority transportation technology devices, provide redundant communication
  rings to promote communications resiliency, expand Automated Traffic Signal        Project Cost               $25,000,000
  Performance Measures (ATSPM) capabilities, and support the application of          2024 Milestones            Added to VDOT’s Six Year Improvement Program
  advanced transportation technologies along priority corridors in the future,       Delivery Date              10-36 Months (Variable by Site)
  including, but not limited to, Connected Autonomous Vehicles.
„ 16 sites have been identified.
                                                                                     Project Characteristics (2023 data)
                                                                                     Miles of Fiber                                  348.6
   #        Location
                                                                                     Devices Directly Impacted                       105
   BRO1     460-83-58-19 Point Coal Loop ($898K)
                                                                                     Devices Indirectly Impacted                     215
   BR05     US 11 Bristol Point ($738K)
   CU02     US29 Culpeper Central ($253K)                                            Benefits
   FR01     US17 / VA 218 to District Office ($1,985K)                               Focus            Metrics                Anticipated Results
   FR04     I-95 VSL ($1,246K)                                                                        Number of              Improved safety as a direct result of reduction
                                                                                     Safety
                                                                                                      Collisions             of the total number of collisions
   FR06     VA3 to Culpeper ($144K)
                                                                                                      Response Time          Improved response time as a direct result of
   HR01     17 Hampton Roads Coleman Bridge ($6,410K)                                Mobility
                                                                                                      Clearance Time         the fiber communication
   HR07     VA 7 603, US 60 Williamsburg ($634K)
                                                                                                      Vehicle Hours          Lower vehicle hours of delay due to more resilient
   LY03     US 29 Lynchburg North to Culpeper ($521K)
                                                                                     Congestion
                                                                                                      of Delay (VHD)         networks
   LY04     US 58 Danville – South Boston ($131K)                                                     # Response Plans       Increased number of notifications leading to more
                                                                                     Travel Data
                                                                                                      # Notifications        robust travel data
   NV01     I-66 WMATA NoVA ($106K)
   NV02     US 29 Gainsville ($270K)
   NV04     District Hubs (Node 9 to 12) ($1,299K)
   RI01     I-295 from 250 to I-95 ($920K)
   ST02     I-81 Staunton North Gap ($7,882K)
   ST03     I-81 / I-66 Osprey ($1,790K)



                                                                             28 | 2024 ITTF
          Northern Virginia Traffic Signal Controllers

ITTF PURPOSES                                                                       Overview
                                                                                    Location                  Northern Virginia
                                                                                    VDOT District             Northern Virginia
                                                                                    Route                     Multiple
Description                                                                         City/County               Multiple
                                                                                                              Automated Traffic Signal Performance Measures Advancement
„ This project expands the ATSPM program by installing controllers and central      Innovative Elements
                                                                                                              Updated CPUs
  processing unit enhancements throughout Northern Virginia.
                                                                                    Project Cost              $2,000,000
„ The resulting ATSPMs will provide congestion and mobility benefits to the
                                                                                    2024 Milestones           Added to VDOT’s Six Year Improvement Program
  area.
                                                                                    Delivery Date             November 2025
„ This project will provide full deployment of ATSPMs in the Northern Virginia
  District, which will allow for advanced strategies to improve mobility.
                                                                                    Project Characteristics – All Northern Virginia District
                                                                                    (2023 data)
                                                                                    Total VDOT Signals                            1,477
                                                                                    Advanced Transportation Controllers
                                                                                                                                  850
                                                                                    Replacements




                                                                                    Benefits
                                                                                    Focus           Metrics               Anticipated Results
                                                                                                                          The updated platform will advise VDOT on
                                                                                    Safety          Collisions
                                                                                                                          where safety improvements can be made.
                                                                                                    Response Time         The updated platform will advise VDOT on
                                                                                    Mobility
                                                                                                    Clearance Time        where mobility improvements can be made.
                                                                                                    Vehicle Hours         The updated platform will advise VDOT on
                                                                                    Congestion
                                                                                                    of Delay (VHD)        where congestion improvements can be made.
                                                                                                    # Response Plans      Improvement in traveler experiences is
                                                                                    Travel Data
                                                                                                    # Notifications       anticipated as a secondary benefit of ATSPMs.




                                                                            29 | 2024 ITTF
ATSPM ProjectsATSPM
               on US 29, VA 3, US
                     Projects     25029,
                               on US  (UPC  125829)
                                         VA 3, US 250

iew           ITTF PURPOSES                                 Existing Characteristics (2023)Overview ITTF Evaluation Ratings
                                                                                                        Location                  Central Virginia
                                      Culpeper District     Vehicle Hours of Delay                      VDOT District Overall Culpeper
                                                                                                       596,000                Project Rating                           98
                                           Troy Austin      Cost of Delay                          $24,900,000
                                                                                                        Route         Projected Value-to-Cost
                                                                                                                              US-29,          Ratio
                                                                                                                                     VA-3, US-250                     11.2
25829)                                 Rural/Suburban
              Description                                   Total Crashes                               City/County
                                                                                                             70         Impact Charlottesville/Orange & Madison High
                                                                                                                                                                Counties
                                   US 29, VA 3, US 250      VMT and formulate an updated           132,900,000                 LIDAR Detection/Data-Collection
                                                                                                                        Innovation                                    High
              „ This project aims to acquire detection equipment
                                                                                                        Innovative Elements     AI Processing Near Misses
         Charlottesville/Orange
                coordination plan & to
                                    Madison    Counties
                                        implement   Automated Traffic    SignalIndex
                                                                  Travel Time   Performance           US 29 – 1.3        Complexity                            MediumMetrics
aracteristics Metrics
                 (2023)(ATSPM) for enhancedITTF Evaluation
                                                   real-time
                                                                   Ratings
                                                              traffic data and  improved   signal
                                                                                                                                Automated Traffic Signal Performance
                                              $873,000                                                 VA 3 – 1.3
                         The objectives8.                                                                 Project Cost          $873,000
of Delay        timings.596,000              ATSPM
                                           are to alleviate
                                           Overall         Projects       on USsafety,
                                                            congestion, enhance
                                                   Project Rating                    29,98and
                                                                                            VA 3, US     250
                                                                                                     US 250     (UPC 125829)
                                                                                                            – 2.5
                improve emergency response.        Additionally, the project aims to enhance the
                                             12 Months                                                    2024 Milestones       Added to VDOT’s Six Year Improvement Program
                    $24,900,000            Projected  Value-to-Cost Ratio              11.2
                overall driver experience by exploring the use of innovative technologies.                Delivery Date         August 2025
                              70
                These technologies         Impact
                                       include                  Innovative and
                                                LIDAR detection/data-collection  Elements
                                                                                       High
                                                                                        AI
                        Project
                processors         Overview
                             to identify
                    132,900,000           “near  misses” between
                                           Innovation                vehicles and verify
                                                                 LIDAR                  red
                                                                           detection/data-collection
                                                                                       High                 Existing
                                                                                                          AI          Characteristics
                                                                                                               processing near misses       (2023)
                                                                                                                                               ATSPM               ITTF Evaluation Ratings
                light-running events. Compliance with EO-30 (AI) will be required.
dex                    US Proposed
                          29 – 1.3 By     Complexity                           Culpeper District
                                                                              Medium                    Roadway     Characteristics
                                                                                                         Vehicle Hours of Delay     (2023 data)
                                                                                                                                        596,000                        Overall Project Rating
                        VAPoint-of-Contact
                           3 – 1.3                                                   Troy Austin        Annual Vehicle Hours of Delay                 596,000
                                                                                                          Cost of Delay                          $24,900,000           Projected Value-to-Cost Ratio
                      US 250 – 2.5
                          Location Context                                      Rural/Suburban            Total
                                                                                                        Cost    Crashes
                                                                                                             of Delay                                   $24,900,000 Impact
                                                                                                                                                           70
                          Routes                                            US 29, VA 3, US 250           VMT
                                                                                                        Total Crashes                            132,900,000
                                                                                                                                                      70               Innovation
Elements
                          Cities/Counties           Charlottesville/Orange & Madison Counties             Travel Daily
                                                                                                                 Time Traffic
                                                                                                                       Index Volume               US 29132,900,000
                                                                                                                                                        – 1.3          Complexity                      M
ion/data-collection        AI processing near misses       ATSPM                                      Average
                          Estimated Cost                                            $873,000                                                       VA 3 – 1.3
                                                                                                        Travel Time Index                        US 250US
                                                                                                                                                        – 29
                                                                                                                                                          2.5 – 1.3, VA 3 – 1.3, US 250 – 2.5
                          Expected Duration
                                                                                     12 Months
                          (PE & CN)
                                                                                                         Innovative Elements
                                                                                                        Benefits
                                                                                                          LIDAR detection/data-collection             AI processing near
                                                                                                                                                                        19
                                                                                                                                                                           misses           ATSPM
                                                                                                        Focus           Metrics                 Anticipated Results
                                                                                                                                                Improved safety as a direct result of mobility
                                                                                                        Safety          Collisions
                                                                                                                                                and congestion improvements
                                                                                                                        Response Time           Improved mobility through real-time
                                                                                                        Mobility
                                                                                                                        Clearance Time          adjustments to signal timings
                                                                                                                        Vehicle Hours           Improved congestion mitigation through
                                                                                                        Congestion
                                                                                      19                                of Delay (VHD)          real-time adjustments to signal timings
                                                                                                                        # Response Plans        Use of real-time data streams to make
                                                                                                        Travel Data
                                                                                                                        # Notifications         decisions to improve congestion and mobility



                                                                                           30 | 2024 ITTF
           I-81 Quick Look Advanced Monitoring Display

ITTF PURPOSES                                                                           Overview
                                                                                        Location                  Traffic Operation Centers
                                                                                        VDOT District             Bristol, Salem, Staunton
                                                                                        Route                     I-81
Description                                                                             City/County               All counties on I-81 Corridor
                                                                                                                  Advanced Video Tool
„ This project will implement a feature to display the status of the I-81 Corridor      Innovative Elements
                                                                                                                  Advanced Traffic Management Systems Enhancements
   (Bristol, Salem and Staunton). This feature will visually indicate the flow of
   traffic using color codes: green for normal flow, yellow for slowing, red for        Project Cost              $500,000/District ($1,000,000 Total)
   creeping, and black for stopped traffic. The display, in the form of a ribbon,       2024 Milestones           Added to VDOT’s Six Year Improvement Program
   will allow traffic operation center staff to interpret traffic conditions within     Delivery Date             October 2025
   the system.
„ The proposed technology has been implemented in Pennsylvania and was
                                                                                        Roadway Characteristics – All I-81 (2023 data)
   recommended in the VDOT I-81 Advanced Technologies Study.
                                                                                        Metrics                                  Salem                       Staunton
                                                                                        Annual Vehicle Hours of Delay            426K                          453K
                                                                                        Annual Vehicle Cost of Delay            $17.8M                        $18.9K
                                                                                        Total # Incidents/Year                   5,135                        7,839
                                                                                        Vehicle Miles Traveled                    1.3B                         1.7B
                                                                                        # of Miles                               172.8                         302



                                                                                        Benefits
                                                                                        Focus           Metrics                Anticipated Results
                                                                                                                               By alerting staff to changes in traffic conditions,
                                                                                                        Vehicle Hours
                                                                                        Congestion                             responses to improve congestion can be
                                                                                                        of Delay (VHD)
                                                                                                                               implemented faster.
                                                                                                                               The primary purpose of this project is to make
                                                                                                        # Response Plans
                                                                                        Travel Data                            existing travel data usable in real time to VDOT
                                                                                                        # Notifications
                                                                                                                               staff.




                                                                                31 | 2024 ITTF
           Hampton Roads Signal Preemption

ITTF PURPOSES                                                                             Overview
                                                                                          Location                  Hampton Roads
                                                                                          VDOT District             Hampton Roads
                                                                                          Route                     Multiple
Description                                                                               City/County               York
                                                                                          Innovative Elements       Signal Preemption
„ The Hampton Roads Transportation Operations Subcommittee (HRTO) aims
   to standardize a preemption scheme across Hampton Roads to minimize                    Project Cost              $175,000
   delays for emergency vehicles at traffic signals.                                      2024 Milestones           Added to VDOT’s Six Year Improvement Program
„ The project will validate the entities preempting signals and identify any              Delivery Date             December 2025
   unauthorized sources.
„ Its goal is to fill gaps in signal preemption coverage, particularly in urban
   areas, improving safety and consistency for emergency response vehicles.
                                                                                          Project Characteristics – Route 17 York County (2023 data)
                                                                                          Number of Signals (require preemption)        9
                                                                                          Total Crashes                                 50
                                                                                          Average Daily Traffic Volume                  30,943




                                                                                          Benefits
                                                                                          Focus           Metrics                       Anticipated Results
                                                                                                                                        Safety improvements resulting from
                                                                                          Safety          Collisions
                                                                                                                                        faster incident response times
                                                                                          Emergency       Response Time                 Signal preemption is a proven strategy
                                                                                          Response        Clearance Time                to improve incident response times.




                                                                                  32 | 2024 ITTF
          Mobile Crash / Fire Notification Tools

ITTF PURPOSES                                                                          Overview
                                                                                       Location                  Hampton Roads
                                                                                       VDOT District             Hampton Roads
                                                                                       Route                     Multiple
Description                                                                            City/County               Multiple
                                                                                                                 Advanced CCTV trailers
„ The project will develop and deploy advanced portable camera trailers                Innovative Elements
                                                                                                                 Computer Vision Alarms
  at strategic locations to better detect crashes and other major incidents.
                                                                                       Project Cost              $500,000
„ This is aimed at overcoming limitations in current detection systems for
                                                                                       2024 Milestones           Added to VDOT’s Six Year Improvement Program
  more rapid responses.
                                                                                       Delivery Date             October 2025
„ The capabilities and effectiveness of this system will be evaluated during
  the implementation.
„ The project will test the system on I-664 in the vicinity of Monitor Merrimac        Roadway Characteristics – All Hampton Roads District
  Memorial Bridge Tunnel.
                                                                                       (2023 data)
                                                                                       Work Zone Related Crashes                     1,136
                                                                                       Work Zone Related Killed or Seriously
                                                                                                                                     33
                                                                                       Injured Crashes




                                                                                       Benefits
                                                                                       Focus           Metrics                       Anticipated Results
                                                                                                                                     Automatic detection of crashes in
                                                                                                                                     work zones allows for faster response
                                                                                       Safety          Collisions
                                                                                                                                     times by first responders which, in
                                                                                                                                     turn, contributes to incident safety.
                                                                                                                                     Automatic detection of crashes in work
                                                                                       Emergency       Response Time
                                                                                                                                     zones leads to faster response times by
                                                                                       Response        Clearance Time
                                                                                                                                     first responders.




                                                                               33 | 2024 ITTF
                           I-664 / Route 17 Bridge Road Integrated Corridor Management Phase II – Development

                ITTF PURPOSES                                                                                 Overview
                                                                                                              Location                  Hampton Roads James River Crossings
                                                                                                              VDOT District             Hampton Roads
                                                                                                              Route                     I-664, US-17, US-60
                Description                                                                                   City/County               Newport News, Norfolk
 29,  VA„250
Corridor
  3, US   3,Phase
               USII of the
         Management
Management    (UPC
                       250  (UPC
                           Route
                        125048)
                                     125048)
                                 17 Integrated Corridor Management (ICM)                                      Innovative Elements
                                                                                                                                        Integrated Corridor Management
                                                                                                                                        Automated Control and Notification Systems
           project is focused on further developement of traffic control assets
               for enhanced management of a key detour route that handles                                     Project Cost              $4,840,000
               approximately 28,000 vehicles daily. A concept of operations study,                            2024 Milestones           Added to VDOT’s Six Year Improvement Program
        Existing   Characteristics
               using ITTF (2023)
                                       (2023)
                          funds, has been completed.
                                                             ITTF Evaluation Ratings
 sting Characteristics                          ITTF Evaluation Ratings                                       Delivery Date             September 2025
            Vehicle Hours
                „ The     of Delay
                        project                    695,000
                                aims to improve communications      toOverall
                                                                       drivers Project Rating
                                                                               and incident                           92
  cle Hours of Delay                  695,000          Overall Project Rating                       92
            Cost of management
                    Delay         using automated  control and notification
                                               $29,073,000                    systems,
                                                                      Projected  Value-to-Cost Ratio             1.9
                                                                                                              Roadway Characteristics (2023 data)
   of Delay         connected with$29,073,000          Projected
                                    local Transportation          Value-to-Cost
                                                          Operation  Centers. The Ratio            1.9
            Total Crashes                                270          Impact                                  Medium                               I-664       US 17 (I-664 – US 60          US 60
  l Crashes         estimated cost of this phase
                                           270 is $4.84    million, which will cover design, Medium
                                                       Impact                                                 Metrics
            VMT construction, and project oversight.
                                               223,351,000            Innovation                              Medium                            (Exit 5 – 9)      Warwick Blvd)          (US 17 – I-664)
 T                                223,351,000          Innovation                             Medium          Annual Vehicle Hours of Delay        468K                 80K                    6.3K
            Travel Time Index                           1.26          Complexity                                  Low
 el Time Index                            1.26         Complexity                                 Low         Annual Cost of Delay               $19.6M                $3.3M                  $264K
                   I-664/Bridge Road Integrated Corridor Management Operations Concept                        # Incidents                         1,419                 479                    N/A
                                                                                                              Median Incident Duration         14 Minutes           15 Minutes                 N/A
                                                                                                              Daily Traffic Volume               32,262                24,890                12,890




                                                                                                              Benefits
                                                                                                              Focus           Metrics                Anticipated Results
                                                                                                                              Response Time          Improved mobility choice made possible by the
                                                                                                              Mobility
                                                                                                                              Clearance Time         ICM system
                                                                                                                                                     An important objective of ICM is to reduce
                                                                                                                              Vehicle Hours
                                                                                                              Congestion                             congestion by informing motorists of alternative
                                                                                                                              of Delay (VHD)
                                                                                                                                                     routes.
                                                                                                              Emergency       Response Time          A primary aim of this project is to improve incident
                                                                                                              Response        Clearance Time         management using automated control systems.
                                                                                                                              # Response Plans       The software system will provide drivers with
                                                                                                              Travel Data
                                                                                                                       29
                                                                                                         29
                                                                                                                              # Notifications        travel data.



                                                                                               34 | 2024 ITTF
           High-Speed Signal Communications for Lynchburg District

ITTF PURPOSES                                                                     Overview
                                                                                  Location                  South Central Virginia
                                                                                  VDOT District             Lynchburg
                                                                                  Route                     11 Intersections
Description                                                                       City/County               Campbell, Halifax, Pittsylvania, Prince Edward, Bedford
                                                                                  Innovative Elements       Automated Traffic Signal Performance Measure (ATSPM)
„ The project aims to implement high-speed communications for real-time
  control and management of transportation systems in Lynchburg, improving        Project Cost              $1,246,800
  latency, safety, mobility, and emergency response. It involves the use of       2024 Milestones           Added to VDOT’s Six Year Improvement Program
  ATSPMs for real-time data collection and signal timing adjustments, and         Delivery Date             December 2025
  encrypted communications for enhanced security.

Location                               Location
24 @ 122: 9017: Bedford County         460 @ 122: 9022: Bedford County            Roadway Characteristics
29B @ 726: 7102: Pittsylvania County   460B @ 15: 7301: Prince Edward County
                                                                                  (2023 data for VDOT’s Lynchburg District):
                                                                                  Metric                              US 29               US 460               US 501
29B @ 40: 7105: Pittsylvania County    501 @ JP: 1541: Campbell County
                                                                                  Annual Vehicle Hours of Delay       20,000              12,000               11,000
29B @ 57: 7104: Pittsylvania County    501 @ 654: 4102: Halifax County
                                                                                  Cost of Delay                     $830,000             $480,000             $460,000
122 @ 655: 9018: Bedford County        622 @ 682: 1513: Campbell County
                                                                                  Average Daily Volume                20,000              18,000               13,000
                                       654 @ 659: 4111: Halifax County




                                                                                  Benefits
                                                                                  Focus           Metrics                Anticipated Results
                                                                                                                         This project aims to provide the infrastructure
                                                                                                  Response Time
                                                                                  Mobility                               necessary to deploy ATSPMs, which improve
                                                                                                  Clearance Time
                                                                                                                         mobility.
                                                                                                  Vehicle Hours
                                                                                  Congestion                             Less traffic signal delay
                                                                                                  of Delay (VHD)




                                                                          35 | 2024 ITTF
          Traffic Signal Technical Upgrades and Corridor Retiming Enhancements

ITTF PURPOSES                                                                 Overview
                                                                              Location                South Central Virginia
                                                                              VDOT District           Lynchburg
                                                                              Route                   US-221, US-460, US-501, US-29
Description                                                                   City/County             Amherst, Appomattox, Bedford, Campbell, Lynchburg
                                                                              Innovative Elements     SmartMicro Radar Detection
„ The project improves traffic flow and safety at signalized
  intersections by using real-time performance measures to identify           Project Cost            $735,000
  unused green time and potential malfunctions.                               2024 Milestones         Added to VDOT’s Six Year Improvement Program
„ The project will use SmartMicro Radar Detection sensors and                 Delivery Date           December 2026
  MioVision 360 cameras, which provide detailed traffic data and
  can detect up to 256 vehicles simultaneously.
„ This data-driven approach will support traffic signal timing
  optimization, thereby reducing congestion, emissions, and fuel              Project Characteristics –
  consumption and increasing safety.                                          Number of Impacted Intersections
                                                                              Amherst County                             7
                                                                              Appomattox County                          4
                                                                              Bedford County and Lynchburg               10
                                                                              Campbell County                            3




                                                                              Benefits
                                                                              Focus         Metrics               Anticipated Results
                                                                                            Number of
                                                                              Safety                              Reduced number of collisions
                                                                                            collisions
                                                                                            Response Time
                                                                              Mobility                            Faster clearance and response times
                                                                                            Clearance Time
                                                                                            Vehicle Hours
                                                                              Congestion                          Reduced vehicle hours of delay
                                                                                            of Delay (VHD)




                                                                      36 | 2024 ITTF
                       Ramp Preemption System

             ITTF PURPOSES                                                                        Overview
                                                                                                  Location                 Greater Richmond
                                                                                                  VDOT District            Richmond
                                                                                                  Route                    Multiple
             Description                                                                          City/County              Chesterfield, Goochland, Henrico, New Kent, Richmond
76)                                                                                               Innovative Elements      Ramp Preemption
             „ This project will implement Queue Detection Systems on signalized interstate
                ramps in the Richmond District to prevent traffic congestion from affecting       Project Cost             $750,000
                mainline routes.                                                                  2024 Milestones          Added to VDOT’s Six Year Improvement Program
Existing Characteristics    (2023)                  ITTF Evaluation Ratings
           „ Expansion of the current I-95 system aims to enhance traffic flow on other           Delivery Date            December 2026
Crashes at Rampslimited-access routes.     620         Overall Project Rating                    72
                                                       Projected value to cost ratio              Project Characteristics – All Richmond District (2023 data)
                                                                                                 9.6
               COUNTY WITH NUMBER                      Impact                                     Crashes at Ramps
                                                                                                Low                                620
               OF LOCATIONS
                                                       Innovation                                 Annual Vehicle Hours of Delay
                                                                                                Low                                            1.87M
            „ Chesterfield – 14
                                         28            Complexity                               Low
            „ Goochland – 3
                                     Locations
            „ Henrico – 8                                                                         Benefits
Innovative Elements
            „ New Kent – 1                                                                        Focus          Metrics                       Anticipated Results
            „ Powhatan – 2
 Ramp preemption                                                                                                                              By mitigating backups onto the
                                                                                                  Safety         Collisions                    mainline, this project reduces the
                                                                                                                                               likelihood of rear-end collisions.
                                                                                                                                               This project reduces congestion
                                                                                                                 Vehicle Hours
                                                                                                  Congestion                                   by getting stopped vehicles off of
                                                                                                                 of Delay (VHD)
                                                                                                                                               the interstate routes.




                                                                                                      35




                                                                                         37 | 2024 ITTF
                        Red Light Extend on High Speed & High-Volume Truck Routes
               Project Overview                                                                    Existing Characteristics (2023)                             ITTF Evaluation Ratings
               Proposed By
            ITTF  PURPOSES                                             Richmond District              Overview
                                                                                                   Crashes at Intersections       12,500                       Overall Project Rating
                 Point-of-Contact                                              Rob Vilak               Location               Greater Richmond
                                                                                                    Crashes Involving Heavy                        812         Projected value to cost ratio
                                                                                                       VDOT District
                                                                                                    Vehicles at Intersections Richmond
                 Location Context                                                   Urban                                                                      Impact
                                                                                                       Route                  Multiple
                 Routes                                                         Multiple                                                                       Innovation
             Description                                                                               City/County            Multiple
                 Cities/Counties                                              Richmond                                        Real-Time Detection              Complexity                      Me
             „ This project proposes to install or modify vehicle detection systems at traffic         Innovative Elements
            Estimated   Cost red-light duration when large, fast-moving $500,000
                                                                                                   Innovative       Elements  Integration with Signals
           signals  to extend                                           vehicles are
& High Volume     Truck
           identified,      Routes
                       thereby        (UPC
                               reducing
            Expected Duration (PE & CN) the risk125374)
                                                 of crashes.          36 Months
                                                                                                       Project Cost
                                                                                                     Real-time detection
                                                                                                                              $500,000
                                                                                                                                               Integration with signals
                                                                                                       2024 Milestones        Added to VDOT’s Six Year Improvement Program
             „ Initially piloted at Route 460 & Cox in Dinwiddie, the expansion will focus on
                high-speed, truck-heavy intersections. Intersections will be evaluated and             Delivery Date          December 2026
      Existingprioritized
               Characteristics     (2023)
                          accordingly.                     ITTF Evaluation Ratings
      Crashes at Intersections              12,500         Overall Project Rating                    74Project Characteristics – All Richmond District
      Crashes Involving Heavy                  812         Projected value to cost ratio           14.8
                                                                                                       (2023 data)
      Vehicles at Intersections
                                                           Impact                                   LowCrashes at Intersections                    12,500

                                                           Innovation                               LowCrashes Involving Heavy Vehicles            812
                                                                                                       at Intersections
                                                           Complexity                            Medium
      Innovative Elements
       Real-time detection                Integration with signals
                                                                                                       Benefits
                                                                                                       Focus              Metrics                  Anticipated Results
                                                                                                                                                   This project specifically aims to improve
                                                                                                                                                   safety at intersections by reducing
                                                                                                       Safety             Collisions
                                                                                                                                                   the likelihood of conflicts with heavy
                                                                                                                                                   vehicles.
                                                                                                       COUNTY WITH NUMBER
                                                                                                       OF LOCATIONS
                                                                                                          „ Amelia – 2
                                                                                                          „ Chesterfield – 21
                                                                                                          „ Dinwiddie – 3
                                                                                                                                         61
                                                                                                          „ Goochland – 3
                                                                                                                                       Locations
                                                                                                          „ Hanover – 8
                                                                                                          „ Henrico – 9
                                                                                                          „ New Kent – 2
                                                                                                          „ Powhatan – 6
                                                                                                          37
                                                                                                          „ Prince George – 7



                                                                                            38 | 2024 ITTF
                          Portable Intelligent Transportation System (ITS) Camera for Incident Monitoring

              ITTF PURPOSES                                                                                 Overview
                                                                                                            Location                  Greater Roanoke
                                                                                                            VDOT District             Salem
                                                                                                            Route                     Multiple
              Description                                                                                   City/County               Multiple
                                                                                                            Innovative Elements       Portable Intelligent Transportation Systems
              „ This project proposes a portable, robust, and waterproof camera system to
                 improve incident management on roadways.                                                   Project Cost              $100,000
                                                                                                            2024 Milestones           Added to VDOT’s Six Year Improvement Program
              „ This quick deploy portable camera system will provide a real-time feed of
              a roadway incident directly to the Traffic Operations Center (TOC), offering                  Delivery Date             December 2025

onstruction and Regional TMP
ent Monitoringvisibility
                (T-UPC:  and situational
                             T29336)awareness where no camera coverage is available.
              This system will be easier and faster to deploy than other portable camera
              systems.
          Existing Characteristics
              „ The system will also(2023)
                                     record incidents forITTF Evaluation
                                                           post-incident      Ratingsfacilitating
                                                                          analyses,                         Roadway Characteristics – All Salem District (2023 data)
ct               improvements in processes and faster clearance     times.                                  Total Crashes                                 11,369
          Total Crashes                       11,369    Overall Project Rating                    78
 d        Number of CCTVs                        125       Projected value to cost ratio        78.0        Number of CCTVs                               125
 n                                                         Impact                               Low
          Innovative Elements
 e                                                         Innovation                           Low
 e         Portable CCTVs
                                                           Complexity                           Low
 0
hs




                                                                                                            Benefits
                                                                                                            Focus           Metrics               Anticipated Results
                                                                                                                                                  Live camera footage of high-risk areas will
                                                                                                            Emergency       Response Time
                                                                                                                                                  provide the Traffic Management Center with the
                                                                                                            Response        Clearance Time
                                                                                                                                                  ability to respond to incidents faster.
                                                                                                                            # Response Plans      The primary purpose of this project is to
                                                                                                            Travel Data
                                                                                                                            # Notifications       increase the video coverage of the District.



                                                                                                       39




                                                                                               39 | 2024 ITTF
                 APPENDIX
                 The Appendix contains a list of all active
                 ITTF projects effective August 31, 2024.
                 Completed projects are excluded.




40 | 2024 ITTF
                                                                              Appendix


                                                                                                                                Tentative
#     UPC       VDOT District                                   Description                         $         Current Phase
                                                                                                                              Delivery Date
                                  Improved Communications for I-664 Monitor Merrimac Memorial
1    105388   Hampton Roads                                                                      $620,448      Installation     12/2024
                                  Bridge Tunnel

2    107058   Hampton Roads       Newport News Citywide Signal Retiming                         $1,910,000       Design         11/2026

                                  Monitor Merrimac Memorial Bridge Tunnel Traffic & Safety
3    108666   Hampton Roads                                                                     $7,123,664     Installation     03/2026
                                  Improvements

4    109506   Statewide           Community Wide Adaptive Signal Systems                        $3,172,507     Installation     01/2025

                                  Active Traffic Management System Enhancements                                Advancing
5    111892   Statewide                                                                         $12,233,789                     06/2025
                                  (Releases 1, 2, 3, & 4)                                                      Release 4

6    112895   Statewide           Statewide Advanced Traffic Signal Controllers                 $3,000,000     Installation     01/2025

7    115832   Northern Virginia   Arlington County Dynamic Parking Pricing                      $5,099,284     Evaluation       12/2025

8    115854   Statewide           Arterial Operations Program Management Dashboard              $1,250,000     Installation     03/2025

9    115855   Statewide           High Speed Communications Design Arterials – Statewide         $749,110      Installation     01/2025

10   116803   Statewide           High Speed Communication Arterials – Northwest                 $490,000      Installation     07/2025

11   116811   Statewide           High Speed Communication Arterials – Southwest                 $300,000      Installation     12/2025

12   117436   Culpeper            Afton Mountain Safety Improvements for I-64                   $3,410,586     Installation     05/2025

13   119199   Statewide           Smarter Lighting Initiative                                    $500,000        Design         12/2025

14   119332   Statewide           Data Driven Management Program for Pavement                    $300,000        Design         01/2025

15   119404   Statewide           Tunnel Speed Guide Lights                                     $1,000,000     Installation     08/2025



                                                                       41 | 2024 ITTF
                                                                                                                                    Tentative
#     UPC       VDOT District                                Description                                $         Current Phase
                                                                                                                                  Delivery Date

16   119406   Statewide           Automated Speed Enforcement Pilot                                 $1,500,000     Installation     06/2025

17   119408   Lynchburg           High-Water Monitoring System – Lynchburg                           $550,000       Scoping         07/2026

                                  Regional Multi-Modal Mobility Program –
18   119720   Statewide                                                                             $8,390,000     Installation     11/2027
                                  Decision Support System & AI Tool

19   119721   Statewide           Regional Multi-Modal Mobility Program – Dynamic Incentivization   $3,500,000     Installation     09/2026

                                  Smart Parking Data Collection, Validation & Outreach
20   120369   Statewide                                                                             $4,800,000     Installation     11/2027
                                  (an RM3P activity)

21   120820   Staunton            High Speed Communications for Signals                              $750,000      Installation     12/2024

22   121564   Statewide           Leveraging Connected Car Data for Improved Safety                  $500,000       Scoping         12/2025

23   121643   Statewide           Smart Intersection Deployment Support                             $1,000,000       Design         05/2026

24   121648   Culpeper            Interchange Lighting at Exit 99                                   $2,640,000      Scoping         07/2028

                                  Northern Virginia/Fredericksburg Cooperative Freeway
25   121653   Statewide                                                                             $3,000,000      Scoping         08/2026
                                  Management

26   121654   Statewide           Develop and Implement a Statewide Network Operating Center        $1,000,000     Installation     12/2025

                                  Regional Multi-Modal Mobility Program –
27   121667   Statewide                                                                             $5,000,000     Installation     09/2028
                                  Supporting Data Services
                                  Real-Time Information Dissemination for Commercial Motor
28   121668   Statewide                                                                             $1,000,000.    Installation     06/2026
                                  Vehicles

29   121670   Statewide           Advanced Road Weather Information Systems Study                    $500,000       Scoping         08/2026

30   121698   Northern Virginia   Dynamic Ramp Metering for I-66 & I-395                            $1,100,000      Scoping         09/2025



                                                                    42 | 2024 ITTF
                                                                           Appendix


                                                                                                                               Tentative
#     UPC        VDOT District                               Description                           $         Current Phase
                                                                                                                             Delivery Date
                                 Resiliency Improvements for Timely Travel Data Systems –
31   121712   Statewide                                                                         $650,000      Installation     06/2025
                                 Network Operation Center
                                 Automated Traffic Signal Performance Measures – Technical
32   121775   Lynchburg                                                                         $720,000        Design         08/2025
                                 Upgrades and Enhancements

33   121822   Statewide          Statewide Fiber Network Stability Enhancements                $2,987,095     Installation     12/2024

                                                                                               $26,298,570
                                 Hard Shoulder Running Technology Implementation for              (ITTF)
34   122147   Richmond                                                                                          Design         04/2028
                                 State Route 288                                               $8,000,000
                                                                                                 (Other)

35   122451   Statewide          High Speed Communications for Advanced Technology Signals      $475,000        Design         12/2024

36   122764   Hampton Roads      Hampton Roads Bridge Tunnel Over-Height Technology            $9,100,000       Design         07/2026

                                                                                                             New Project –
37   125029   Hampton Roads      Hampton Roads Signal Preemption                                $175,000                       12/2025
                                                                                                             Added in 2024
                                 I-664 / Route 17 Bridge Road Integrated Corridor Management                 New Project –
38   125030   Hampton Roads                                                                    $4,840,000                      9/2025
                                 Phase II                                                                    Added in 2024
                                                                                                             New Project –
39   125032   Hampton Roads      Mobile Crash / Fire Notification Tools                         $500,000                       10/2025
                                                                                                             Added in 2024
                                                                                                             New Project –
40   125206   Bristol            Big Walker Mountain Tunnel – Hazmat Placard Reader             $875,000                       12/2026
                                                                                                             Added in 2024
                                                                                                             New Project –
41   125207   Bristol            I-77 Traffic Queue Detection                                  $1,700,000                      12/2026
                                                                                                             Added in 2024
                                                                                                             New Project –
42   125208   Bristol            Big Walker Mountain Tunnel – Thermal Detection                 $875,000                       12/2026
                                                                                                             Added in 2024
                                                                                                             New Project –
43   125374   Richmond           Red Light Extend on High Speed & High Volume Truck Routes      $500,000                       12/2026
                                                                                                             Added in 2024
                                                                                                             New Project –
44   125376   Richmond           Ramp Preemption System                                         $750,000                       12/2026
                                                                                                             Added in 2024



                                                                     43 | 2024 ITTF
                                                                            Appendix


                                                                                                                                 Tentative
#     UPC        VDOT District                                Description                        $         Current Phase
                                                                                                                               Delivery Date
              Bristol, Salem,                                                                              New Project –
45   125726                       I-81 Quick Look Advanced Monitoring System                 $1,000,000                           10/2025
              Staunton                                                                                     Added in 2024
                                                                                                           New Project –
46   125829   Culpeper            ATSPM Projects on US 29, VA 3, US 250                       $873,000                            8/2025
                                                                                                           Added in 2024
                                  Traffic Signal Technical Upgrades and Corridor Reiming                   New Project –
47   126014   Lynchburg                                                                       $735,000                            12/2026
                                  Enhancements                                                             Added in 2024
                                                                                                           New Project –
48   126015   Lynchburg           High Speed Communications for Lynchburg District Signals   $1,246,800                           6/2026
                                                                                                           Added in 2024
                                  Big Walker Mountain Tunnel – Permanent Work Zone / Lane                  New Project –
49   126100   Bristol                                                                        $2,250,000                           12/2026
                                  Closure Technology                                                       Added in 2024
                                  Statewide Transportation Technology Project                                                 10 to 36 months
                                                                                                           New Project –
50   126129   Statewide                                                                      $25,000,000                   (varies per each of the
                                  NOTE: There are 16 breakout projects.                                    Added in 2024
                                                                                                                           16 breakout projects).
                                                                                                           New Project –
51   126225   Bristol             Animal Detection Warning System Pilot                       $640,000                            12/2026
                                                                                                           Added in 2024
                                                                                                           New Project –
52   126241   Hampton Roads       HRBT Over-Height Systems Integration                       $4,000,000                           1/2027
                                                                                                           Added in 2024
                                                                                                           New Project –
53   126454   Salem               Portable ITS Camera for Incident Monitoring                 $100,000                            12/2025
                                                                                                           Added in 2024
                                                                                                           New Project –
54   T29378   Statewide           Statewide Sidewalk and Crosswalk Management Tool            $350,000                            3/2026
                                                                                                           Added in 2024
                                                                                                           New Project –
55   T29379   Northern Virginia   Northern Virginia Traffic Signal Controllers               $2,000,000                           11/2025
                                                                                                           Added in 2024




                                                                      44 | 2024 ITTF
Innovation and Technology
Transportation Fund (ITTF)
Report to the General Assemby
                    2024


File and source

File
2024-RD937.pdf
Size
4,829,341 bytes
SHA-256
149ed5bd78e2531110917eb263d886418bfe12d9635e8a84ac9c5c8daec5d669
Our copy
2024-RD937.pdf
Original
No public link identified.
Back to top