Innovation and Technology Transportation Fund (ITTF) — Virginia Department of Transportation, March 27, 2024
Summary
This is a letter dated March 27, 2024 from the Commissioner of Highways, Stephen C. Brich, P.E., to The Honorable Governor Glenn Youngkin and Members of the Virginia General Assembly, submitting the report on the Innovation and Technology Transportation Fund (ITTF) under Section 33.2-1531 of the Code of Virginia. The attached 2023 ITTF report says ITTF monies are to be used solely for funding pilot programs and fully developed initiatives related to high-tech infrastructure improvements. It lists active projects as of October 31, 2023 and select project fact sheets, among them the I-95 Variable Speed Limit (VSL) System, with $2,404,000 in ITTF funding for the algorithm, and the RM3P Data Exchange Platform, with a project cost of $2,775,000. An appendix lists projects with a current phase and delivery date.
Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used
Cite this document
“Innovation and Technology Transportation Fund (ITTF) — Virginia Department of Transportation, March 27, 2024.”
Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2024-rd251-efdc0e0ae5/
, SHA-256 b6b87fae7eb9e67ec338f44f4c12905859bd5268567b7dd28ecd90600dd51021.Full text
Text recognized from a scanned document; may contain errors. Page 23 of 27 is not shown because the text could not be recognized reliably.
COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen (2. Brich, P.E. 1401 East Broad Street (804) 482-5818 Coimmussioner Richmond, Virginia 23219 Fax (804) 786-2940 March 27, 2024 The Honorable Governor Glenn Youngkin Members of the Virginia General Assembly Dear Ladies and Gentlemen: Section 33.2-1531 of the Code of Virginia directs the Commissioner of Highways to report annually on the use of moneys in the Innovation and Technology Transportation Fund (ITTF). ITTF monies are to be used solely for the purposes of funding pilot programs and fully developed initiatives related to high-tech infrastructure improvements. The term “high-tech infrastructure improvements” pertains to projects or programs that reduce congestion, improve mobility, improve safety, provide up-to-date travel data, or improve emergency response. In accordance with § 33.2-1531 of the Code of Virginia, | am submitting the attached report to you which serves to report on the use of the moneys in the ITTF over the past year. If you have any questions, please do not hesitate to contact E. Kevin Gregg, Chief of Maintenance and Operations, at (757) 620-3691 or me. Sincerely, _ ftp Ba Stephen C. Brich, P.E. Commissioner of Highways c: The Honorable W. Sheppard Miller III G. Michael Fitch, Ph.D. E. Kevin Gregg Attachment VirginiaDOT.org WE KEEP VIRGINIA MOVING Innovation and Technology Transportation Fund (ITTF) Report to the General Assemby TABLE OF CONTENTS 2 21 What is the ITTF ITTF Focuses Projects Status Select Project Fact Sheets Appendix nument DO Front Royal Section 33.2-1531 created the Innovation and Technology Transportation Fund. ITTF monies are to be used solely for the purposes of funding pilot programs and fully developed initiatives pertaining to high-tech infrastructure improvements. “High-tech infrastructure improvements” relate to projects or programs that reduce congestion, improve mobility, improve safety, provide up-to-date travel data, or improve emergency response. Section 33.2-1531 of the Code of Virginia directs the Commissioner of Highways to report annually on the use of moneys in the Innovation and Technology Transportation Fund (ITTF). 3 | 2023 ITTF ITTF Focuses Per Code of Virginia Section 33.2-1531, ITTF projects must address one or more goals: reduce congestion, improve mobility, improve safety, provide up-to-date travel data, and improve emergency response. The ITTF provides funding specifically for the purposes of funding pilot programs and fully developed initiatives pertaining to high-tech infrastructure improvements: The ITTF program enhances road safety through innovative technologies and strategies, aligning with the agency's commitment to reducing crashes. The ITTF program empowers travelers with real-time updates on road conditions, closures, and road impacting events, facilitating more informed and efficient travel. The ITTF program integrates technology to expedite first responders’ access to incident information, to enable swift and effective responses to critical situations. UY The ITTF program advances mobility IMPROVING through investments in smart SAFETY infrastructure and transportation innovation, creating a more connected °). and accessible transportation network ees for the Commonwealth. IMPROVING MOBILITY ITTF PURPOSES The ITTF program leverages technology and data-driven approaches to optimize traffic flow, reduce a bottlenecks, and improve overall AN CORIGESTIGN congestion for the traveling public. Prior to the establishment of the ITTF in 2014, the Virginia Department of Transportation (VDOT) developed a Transportation Technology Plan as a separate, one-time General Assembly report. The Transportation Technology Plan was developed to improve the efficiency, safety, and convenience of all modes of transportation throughout the Commonwealth. This plan identified eight broad technology strategies. These strategies defined projects that were later incorporated in the original ITTF project list. When the ITTF program was incorporated into the Code of Virginia, the language stated that the fund would support advancing pilot programs and fully developed initiatives. The alignment of eight Transportation Technology Plan strategies to the ITTF focus areas is shown below: 2014 Transportation Technology Plan Current Code of Virginia ITTF Focus Areas Strategy Enhanced Operations Traffic Management Reduce Congestion Improve Safety Improve Mobility _Improve Emergency Response Reduce Congestion Improve Mobility Reduce Congestion Improve Mobility Strengthen Incident and Emergency Response Improve Emergency Response Reduce Congestion Improve Mobility safety, provide up-to date travel data, and improve emergency response can support emerging technology research. (2) The Virginia Transportation Research Council can also conduct such research using other funding sources. EnhancelEnabling Technology Infrastructure All ITTF projects may have an opportunity to include enabling technology infrastructure in the project scope. Active Projects as of October 31, 2023 93 $147M Active Active Projects Projects Value Completed Projects January 2023 - October 2023 20 Completed Projects IMPROVING SAFETY IMPROVING MOBILITY ITTF PURPOSES ITTF Focus Areas 25 REDUCING ENHANCING CONGESTION EMERGENCY RESPONSE Project Status Summary The duration of each project varies based on its complexity. A simple ITTF project may be completed within a year. Complex projects may take multiple years to complete. 8 ¢ 10 ¢% 25 - Scoping/Study Design Installation 6 | 2023 ITTF SELECT PROJECT FACT SHEETS These projects that have either: =» Completed scoping studies =» Completed the design phase = Finished the installation I-95 Variable Speed Limit (VSL) System ITTF PURPOSES Overview Location I-95 in Spotsylvania County/City of Fredericksburg VDOT District Fredericksburg Route 1-95 Project Purpose City/County Fredericksburg, Spotsylvania, Caroline VDOT has installed variable speed limits on the I-95 northbound Category Advanced Roadway Technology corridor between mile markers 115 and 130 in Caroline and Project Cost $2,404,000 (ITTF Funding for the I-95 VSL Algorithm) Spotsylvania counties. This is to address crashes caused by Construction complete. unexpected speed differentials when encountering congestion or lane 2023 Milestones System operational, June 2022. impacting events. LED signs displaying variable speed limits between Evaluations completed, 2023. 35 mph and 65-70 mph, along with dynamic message boards, provide real-time information to drivers. The speed limits are reduced only Roadway Characteristics when necessary based on traffic speed and volume data collected by 2021 2023 vehicle detectors. Enforcement authorities have access to real-time Metric Pre-Implementation _Post-Implementation changes in the posted speed limits. Annual Vehicle Hours of Delay 775K 764K . a. . Annual Vehicle H Cost Description (ITTF Funded Portion for I-95 VSL) ofDeay SCS*« 8M $29.5M Develop the algorithms for the I-95 Variable Speed Limit technology. All Crashes 991 286 From 115 to 130 (15 miles), VSL is located on I-95 NB. It includes: Fatal+Injury Crashes 67 58 = Algorithm Enhancements for Work Zones 49K - 57K (2022) = Automated Detector Monitoring and Alerts Daily Traffic Volumes 47K - 57K (2021) 2023 data not available m Active System Management Weekend Days with Speeds 63 5] m System Evaluation Support Below 20 MPH Description (Other Funding Sources for I-95 VSL) Benefits System integration Focus Metrics Results I-95 VSL Infrastructure (detectors, signs, cameras) Safety Reduction Fatal Mi Liriano Reduction in crashes Sideswipe Crashes: 2.7% Reduction Sunday travel times declined by 8.2% Mobility Travel Time Index and reliability improved by 14.4% Vehicle Hours of Delay (VHD) 8 | 2023 ITTF aS Congestion Continuing evaluation RM3P — Data Exchange Platform ITTF PURPOSES Description The Data Exchange Platform is a key component of Regional Multimodal Mobility Program (RM3P), a program to improve mobility in the Northern Virginia and Metropolitan Fredericksburg area. The Data Exchange Platform will support the Al-Decision Support, Dynamic Incentivization, and Commuter Parking Information System which form the RM3P effort. RM3P’s mission is to use real-time data to improve safety, reliability, and mobility; as well as to give the public effective tools to make better- informed travel choices. yD RM8P will ultimately improve mobility by using a new Al-based decision support system to manage maior incidents, and by providing greater information for motorists about travel and parking resources and incentives for travelers to consider alternate travel routes, modes, and schedules during congestion events. These tools are dependent on obtaining real-time data. The Data Exchange Platform is a continuously updated, cloud-based data storage and exchange system that will support the RM3P program. DEP Highlights > \WDOT DRPT Overview Location VDOT District Route City/County Category Project Cost 2023 Milestones Greater Northern Virginia, Fredericksburg Northern Virginia, Fredericksburg Multiple Routes Northern Virginia and Metropolitan Fredericksburg area Advanced Multimodal Traffic Management $2,775,000 Installation completed, June 2023. Roadway Characteristics Annual Vehicle Hours of Delay Annual Vehicle Hours Cost of Delay Total # Incidents (4-year) Median Incident Duration Daily Traffic Volume 8.3M $224.5M 15,113 28 minutes Vary by road Projected Benefits Additional benefits will be part of other RM3P efforts, including the Al-Decision Support System. The data exchange platform project is the core foundation project for the larger RM3P program. The larger RM3P program has the ability to: * — Reduce incident durations by promoting a coordinated response to travel disruptions + — Improve safety by removing hazards more rapidly (20% potential) * — Promote collaborative planning with access to better data * — Enable more reliable commutes with greater information to make informed travel choices and connections * — Develop an incentive program for travels to make travel choices that will help reduce congestion Benefits Focus Metrics Results Information Data Request Additional 60K requests 9 | 2023 ITTF Arlington County Parking ITTF PURPOSES Overview Location VDOT District Route Description City/County The Arlington County managed project is implementing a data-driven, Category variable-pricing system and a traveler information system for parking on Project Cost. metered blocks in Arlington County's two Metrorail corridors (Rosslyn- Ballston and Pentagon City/Crystal City) and in up to three County-owned, = 2023 Milestones off-street parking areas within those corridors that are regulated using parking meters. The system includes technology to detect parking space occupancy, integrate with the existing payment methods, and apply dynamic pricing Arlington County Multiple Routes Installation completed 10/2023. System operational 3/2024. Evaluation underway to be completed 3/2025. for 4,563 metered on-street spaces and three off-street paid-parking Roadway Characteristics facilities in the two major Metrorail corridors in Arlington. Poe N/A for transit projects The project's purpose is to improve the user experience with metered parking. = Benefits Focus Metrics Anticipated Results ongestion Miles Driven Fewer repeated trips looking for parking Increasing Reduced double parking Congestion Information 10 | 2023 ITTF _Road Capacity | Increased Parking Public can access Arlington County website Information —_ about parking cost and availability ATSPM Program - Foundation Projects ITTF PURPOSES Overview Location Statewide ME Category Signal Detection Upgrades Foundation Projects Cost $8,131,000 Description 2023 Milestones Eight foundation projectscompleted = VDOT has a master plan to implement advanced technologies based on the Automated Traffic Signal Performance Measures (ATSPM). Roadway Characteristics proactively by updating signal retimings based on performance and data. In order to advance ATSPM, VDOT must provide high-speed communications to the signals, advanced traffic controllers, and Benefits - for the complete ATSPM Program ATSPM Software. These are the foundation projects. VDOT established multiple projects to advance the ATSPM. The CO following table defines the foundational projects completed in 2023. Safety Collisions Reduced number and reduce severity The ATSPM's full deployment is funded by multiple funding sources. &) Mobility Travel Time Reliability Improved reliability with vehicle detection The VDOT Central Signal System will benefit from these real-time FS cscs VehicleHours Emergency Incident Duration First responders able to reach incidents Response a. Ster with emergency vehicle pre-emption Information Information for Increased real-time intersection Connected Vehicles operation data without additional cost Benefits - for the foundation projects oo January 2022 December 2023 3,137 Traffic Signals Statewide 3,165 Traffic Signals Statewide High Speed Communications With ITTF B High Speed Communications B® ATC / D4 Migration (2808 - 90%) and Other @ ATC/ D4 Migration (3153 - 99%) B® KITS Deployment (Configured — 2915 — 93%) 25% . Funding KITS Configured (3165 — 100%) KITS Deployment (Live — 1829 — 58%) Hl KITS Live (2832 - 90%) H ATSPM (Active — 196 — 6%) W@ ATSPM Configured (2283 — 72%) i ATSPM Active (1043 - 33%) 100% 100% 11 | 2023 ITTF ATSPM Program - Foundation Projects High-Speed Communication for Signals |-64 Corridor Arterials - Routes 60, 143, 199 Signal Communication Newport News to New Kent High-Speed Communications Arterials Northern Virginia 17 Signal Communication Cameras Salem Signal Communication Statewide Community-wide Adaptive Signal Systems High-Speed Communications for Signals Route 134 Route 17 Business - Communications Project and ITS Upgrades 2023 ATSPM Program - Foundation Projects High-speed communications for multiple arterial routes in VDOT's Fredericksburg, Hampton Roads, Northern Virginia, Salem, and Staunton Districts. Installation of approx. 3.8 miles of new fiber along Rt 143 and US 60 in James City County. Design and install Fiber Optic Signal Communications along Rt 199. High-speed communications to Northern Virginia traffic signals to help eliminate third-party circuits servicing. Routes 234 Bypass, 28, and 50. Signal/arterial technology on alternative routes to I-95 in Stafford, Spotsylvania, and Caroline Counties, including: signal controller upgrades and alternative/backup power sources. Installed signal communications infrastructure (i.e., conduit, fiber optic cable, and junction boxes) at nine intersections districtwide. Installed adapative signal control systems across the Commonwealth on key arterial corridors. Installation of approx. 3.4 miles of new fiber along Rt 134 and Rt 171 in York County. Providing high-speed communications and a redundant fiber path for future US 17 fiber. Upgraded communications and traffic signal equipment, including the installation of Intelligent Transportation System (ITS) conduit and fiber optic cable reaper stations, 5.8 GHz wireless broadband radios, and ATC signal cabinets with controllers. Multiple subprojects throughout 2023 March 2023 April 2023 April 2023 June 2023 June 2023 August 2023 September 2023 12 | 2023 ITTF Rural Microtransit Pilot (DRPT-led) — Statewide Overview ITTF PURPOSES ; ; Location Statewide Locations VDOT District Fredericksburg, Bristol Route Multiple Routes Description City/County State-wide Middle Peninsula P Category Advanced Transit Technology Solution The Department of Rail and Public Transportation (DRPT) applied for and received an Integrated Mobility Innovation Demonstration Research Program Grant to plan and implement microtransit in two rural areas in the Commonwealth. Project Cost $68,970 2023 Milestones _ Project completed, June 2023. DRPT collaborated with two rural transit providers, Bay Transit and Mountain Empire Older Citizens, to procure and operate microtransit using a Software-as-a-Service model. The performance of the two microtransit demonstrations was evaluated Transit Community Characteristics over the course of 18 months. The findings were summarized and Bay Transit provided public transportation services in the counties of Charles City, implementation toolkit for other interested rural transit agencies. New Kent, Northumberland, Richmond, and Westmoreland. Mountain Empire Older Citizens (MEOC) provides demand response services for Wise, Lee, and Scott Counties in southwest Virginia. Both microtransit pilots operating in rural, non-metropolitan areas with service zone size of less than 50 square miles and total population and employment within zones, combined, of less than 100,000 residents and jobs. Benefits Focus Metrics Results Ridership increased over 18-month period. Mobilit Reliable Travel | MEOC provided 38,996 trips in the y Route Provided 18-month study. Bay Transit provided 9,039 trips in the 18-month study. Congestion # of Drivers Return riders increased 63% 13 | 2023 ITTF Regional Microtransit Demonstration (DRPT-led) ITTF PURPOSES Overview evs VDOT District Hampton Roads _ Route nn Multiple Routes Description City/County Multiple cities in Hampton Roads. The Department of Rail and Public Transportation (DRPT) partnered Category ANSE te with Hampton Roads Transit (HRT) to plan, deploy, and comparatively ProjectCost = $1,558,000 evaluate performance for on-demand microtransit services in two 2023 Milestones Project completed, September 2023. unique use cases over a six-month period. The deployed service provided shared rides in small and medium-sized vehicles for short-distance trips, created a reservation and fare- collection system, and offered a center for customer comments and ; ; . complaints. Transit Community Characteristics This deployment allowed the Hampton Roads region to determine the Hampton Roads Transit provides fixed-route, paratransit, light rail, and ferry effectiveness of microtransit and if microtransit is a feasible alternative services for the Cities of Newport News, Norfolk, Virginia Beach, Hampton, and complement to existing fixed-route transit. The project also helped Portsmouth, and Chesapeake, explore new markets for transit and enhance organizational capacities. Service zones were in the Cities of Virginia Beach and Newport News. Benefits Focus Metrics Anticipated Results Increase Use of Total Ridership = 23,300 ~~ Mobility Microtransit vs. 60% of riders used microtransit for “a Personal Vehicles commuting 14 | 2023 ITTF Commute! Virginia Commuter Ridematching & Incentive Program (DRPT-led) ITTF PURPOSES wD Description The Department of Rail and Public Transportation (DRPT) partnered with local commuter assistance programs throughout Virginia to create a new statewide ride-matching and rewards program. DRPT created the Commute!VA app and website (now ConnectingVA) which allowed commuters to discover all of the multimodal transportation options available in the Commonwealth, including all forms of transit, carpool and vanpool options. The app helped users find rides based on mode (carpool, vanpool, bus), trip origin and destination, time, day of the week, and more. The app also provided trip planning, showed park-and-ride locations, electric vehicle charging locations, bike paths, bike share locations, and traffic conditions. Commuters who used the app earned points for recording trips made by carpool, vanpool, transit, or bike and could redeem them for rewards such as discounts at select retailers, restaurants, attractions, and more. DRPT added a Ride Home Rewards feature to provide free rides home or to a park-and-ride lot when a person emergency happens on a day the commuter used transit, carpool, or vanpool. BY DRPT Ways To Get Around Virginia ID Overview Location Statewide VDOT District Statewide Route Multiple Routes City/County Statewide Category Advanced Transit Technology Solution Project Cost $350,000 2023 Milestones Project completed, September 2023. Transit Community Characteristics Implemented for the regions of: Central Shenandoah, Charlottesville, Hampton Roads, Lynchburg, Middle Peninsula, New River Valley, Northern Neck, Richmond, Roanoke/Alleghany Valley, and West Piedmont, ConnectingVA was expanded to serve the regions of Fredericksburg, Culpeper/Rappahannock, Northern Shenandoah Benefits Focus Metrics Results Increase Usage Mobility Trips increased 33% to 344K of Transit Congestion Miles Not Driven 6.4M Travel Time # Participants Enrollment increased 8% Information P to 30.4K users 15 | 2023 ITTF l-64 Afton Mountain Safety Improvements ITTF PURPOSES Overview Location Afton Mountain VDOT District Culpeper, Stauton Description City/County __ Albemarle, Nelson, Augusta, Use by-lane traffic sensors to detect and notify travelers of periods Category = — Advanced Roadway Technology of congestion. ProjectCost = $2,500,000 Develop new Congestion Warning System (CWS) that will analyze Design plans completed. data from existing and new detector stations, notify Transportation 2023 Milestones Awarded installation contract, May 2023. Operations Center staff, and disseminate messaging to sign can, €urrent phase: under construction, infrastructure. Delivery Date April 2025 Integrate CWS with Advanced Traffic Management System (ATMS) to automate detection and messaging. Roa dway Characteristics Total # Incidents 119 Median Incident Duration 40 minutes Daily Traffic Volume 17K - 19K Estimated Reduction in Associated Crashes 16% Benefits Focus Metrics Anticipated Results Safety Rear End Collisions Reduction Safety Secondary Collisions of Delay (VHD) Reduction in few incidents to clear Congestion 16 | 2023 ITTF Route 288 Hard Shoulder Running ITTF PURPOSES Overview aD Location Greater Richmond Description City/County Goochland, Powhatan, Deployment of Intelligent Transportation System (ITS) infrastructure and Category _—_ Advanced Roadway Technology os necessary pavement improvements to implement the use of Hard Shoulder ProjectCost —- $31,561,735 ITTF & $8,000,000 CVTA funds Running (HSR) on State Route 288 northbound between Rt 711 (Huguenot Preliminary scoping completed. Concept of operations completed, May 2023. Trail) in Powhatan County and Rt 6 (Patterson Avenue), in Goochland County. Delivery Date Early 2027 Technologies include lane control, traffic detectors, message signs, automated incident detection cameras, and changeable speed limit 2023 Milestones signage. Roadway Characteristics The HSR will provide additional capacity during peak travel periods. (From State Route 288 to Rt 6 to Robious Rd) Annual Vehicle Hours of Delay 16K Annual Vehicle Hours Cost of Delay oe $477K | Median Incident Duration ad minutes | Daily Traffic Volume 52724 Benefits Focus Metrics Anticipated Results Secondary Incidents Fewer events £). Mobility Travel Time Index Improved Travel Time Index RT 288 - PTSU Open RT 288 - PTSU Closed Vehicle Hours Emergency _ Incident Detection Time Faster Incident Detection Time ‘25 Response Incident Response Time Shorter Incident Response Time Hampton Roads Bridge Tunnel (HRBT) Over-Height Technology — Westbound ITTF PURPOSES Overview Location |-64 Hampton Roads Bridge Tunnel Westbound Qe «ceri VDOT District Hampton Roads Route 64 Description City/County Norfolk At the I-64 Westbound Hampton Roads Bridge Tunnel (HRBT), there Category Advanced Roadway Technology is acontinued need to alert over height vehicles to turn around before Project Cost $10,000,000 approaching the bridge trestles. The westbound tunnel, opened in 1957, 2023 Milestones Preliminary scoping completed. only has a 13’ 6” clearance. As a result, the facility is vulnerable to strikes and has detections systems to prevent such events. While vehicle strikes are rare, traffic stops are not uncommon to turn around over height vehicles. Short traffic stoppages impact mobility and increase congestion on this vital corridor. Roadway Characteristics Advanced technologies including Lidar (light based radar) to supplement Delivery Date July 2026 ae ; oa, , ; ; Number of Over Height Detection Events 5,394 / year existing detectors are desired to aid in taking a picture of over height vehicles. The picture image of the violating vehicle would be displayed Annual Vehicle Hours Cost of Delay $3.1M on approaching message signs with beacons to alert drivers to exit |-64 Annual Vehicle Hours of Delay Due to Over Height before approaching the trestles. Detection Events. 807K hours Increasing compliance will result in fewer stoppages on I-64 which will Daily Traffic Volume at the 64 WB HRBT 42K ease congestion. Benefits Focus Metrics Anticipated Results Safet Secondary Fewer secondary collisions due to unplanned y Collisions traffic stoppages to turn around vehicles 4: Travel Time sar Mobility Reliability Improved reliability C . Vehicle Hours Reduction in VHD due to fewer over height of Delay (VHD) vehicle turn arounds 18 | 2023 ITTF Connected Work Zones ITTF PURPOSES Description The Connected Work Zone project is a demonstration and evaluation project regarding advanced technologies to improve work zone safety. According to the FHWA, traffic incidents can account for 25% of congestion and work zones can account for 10% of congestion. The project goals are to reduce collisions at and prior to work zones as well as improve traffic flow. Advanced technologies include: m Queue Detection and Warning Systems m Zipper / Dynamic Late Merge m Zipper / Dynamic Merge and Queue Warning System m Truck Entering Highway Alerts Pilot work zones were chosen on the I-81 Corridor STOPPED OR | TRAFFIC AHEAD USE ALL ay OR LANES TO MERGE ° Safety Overview Location Statewide Application VDOT District Bristol, Culpeper, Staunton Pilot sites are located at: * 1-81 SB MM 288 - bridge rehabilitation southbound lanes south of the Tom's Brook interchange at MM 291 Routes * 1-81 NB MM 287 - bridge rehabilitation northbound lanes south of the Tom's Brook interchange at MM 291 * +81 SB MM 8.16 to MM 9.77 - widen from 2 lanes to 3 lanes * — 1-66 WB MM 32 - bridge rehabilitation westbound lanes City/County Fauquier, Shenandoah, and Washington Counties Category Advanced Roadway Technology Project Cost $600,000 Scoping completed. Established pilot locations and schedule. August 2024 2023 Milestones Delivery Date Roadway Characteristic for all I-81 (2023) Average Annual Vehicle Hours of Delay at Work Zone Sites 200K Annual Vehicle Hours Cost of Delay $10.5M Incidents in Work Zones 2,500 Benefits Focus Metrics Anticipated Results Reduction in rear end collisions in queues, Collisions er ; . reduction in merging collisions, queue reduction 19 | 2023 ITTF RM3P - Al-Decision Support System ITTF PURPOSES Overview Location Greater Northern Virginia, Fredericksburg Aaa VDOT District Northern Virginia, Fredericksburg Route Multiple Routes Description City/County District Wide The Artificial Intelligence-Decision Support System (AI-DSS) is a tool Category Al Application, Advanced Multimodal Traffic Management that will predict the impact of disruptions to the transportation network Project Cost $7,890,000 and provide coordinated response recommendations to VDOT and other 2023 Milest Scoping completed. multimodal agencies. Mestones awarded contract, October 2023. The tool will use data to monitor emerging conditions and recommend Delivery Date November 2025 (includes evaluations) plans for coordinated, multi-agency responses to congestion, incidents, and events. The project is part of the larger Regional Multimodal Mobility Roadway Characteristics Program, including separate UPCs and elements such as the Data Annual Vehicle Hours of Delay 8.3M Exchange Platform, Commuter Parking Information System, Dynamic Incentivization, etc. It also includes grant funding (for Fredericksburg) Annual Vehicle Hours Cost of Delay $224.5M from the 2019 ATCMTD grant. Total # Incidents/Year 3,778 Median Incident Duration 28 minutes Daily Traffic Volume Varies by road Benefits Focus Metrics Anticipated Results Safety Collisions Potential 20% reduction in collisions Mobility Travel Time Index May provide a 3% - 10% improvement in reliability s SA Concestion Vehicle Hours May be reduced from 132K - 700K . g of Delay (VHD) hours per year j ao fh Emergency Response Time AI-DSS may improve incident clearance oy & aK gency P . time as an indirect element. Al-DSS & ? ag! 2 Response Clearance Time promotes mitigation lest were i Travel Data * Response Plans Improved situational awareness # Notifications 20 | 2023 ITTF UPC VDOT District Appendix Description Current Phase Tentative 16 | 122904 | Statewide Connected Work Zone Technologies $2,987,095 Design 5/2024 17 | 105380 Bristol Big Walker Mountain Tunnel $368,233 Design N/A - Design nF Tunnel Lane Control Improvement Design Corridor Congestion Improvement 18 105381 Bristol East River Mountain Tunnel $588,233 Design N/A - Design Tunnel Lane Control Design 19 | 109506 | Statewide Community Wide Adaptive Signal Systems $3,168,399 Installation 7/2024 20 108666 Hampton Road Monitor Merrimac Memorial Bridge Tunnel Traffic & Safety $7,013,664 Installation 12/2024 21 | 112895 | Statewide Statewide Advanced Traffic Signal Controllers $3,000,000 Installation 7/2024 22 115854 Statewide Arterial Operations Program Management Dashboard $1,250,000 __ Installation 12/2024 23 | 115832 | Northern Virginia | Performance Parking Deployment in Commercial Corridors $4,694,284 Installation 12/2025 o4 115855 Statewide High Speed Communications Design for Arterials - $749,110 Design N/A - Design 25 | 115856 | Statewide Parking Demand Management System $1,950,000 Installation 11/2025 26 116036 | Statewide RM3P Management & Solution Design $3,310,000 Design N/A - Design 27 | 116803 | Statewide High Speed Communication Arterials $490,000 Installation 7/2024 28 116811 Statewide High Speed Communication Arterials $300,000 Installation 6/2024 29 | 117222 | Statewide Transportation Data Analytics Statewide $3,000,000 Scoping 8/2024 23 | 2023 ITTF Appendix UPC VDOT District Description Current Phase en 30 117436 | Culpeper 1-64 Afton Mountain Safety Improvements $3,350,586 | Installation 4/2025 yy 118795 | Richmond High Speed — Ament - Richmond $427,000 Installation 6/2024 33 | 119199 | Statewide Smarter Lighting Initiative $500,000 Scoping 12/2025 ag 119408 | Lynchburg High-Water — System - Lynchburg $666,219 Scoping 8/2025 37 | 119720 | Statewide RM8P Decision Support System & Al Tool $7,890,000 | Installation 11/2027 a 120369 | Statewide Smart oe Data Collection, rater & Outreach $2,850,000 Scoping 11/2027 41 | 120820 | Staunton High Speed Communications for Signals $750,000 Installation 12/2024 44 | 121670 | Statewide Advanced Road Weather Information Systems Study $500,000 Scoping 9/2027 24 | 2023 ITTF Appendix UPC _—-VDOT District Description Current Phase EDEN Delivery Date 45 121643 Statewide Smart Intersection Deployment Support $1,000,000 Design 5/2026 46 121667 Statewide RM3P Supporting Data Services $5,000,000 Installation 9/2028 47 121668 Statewide Real-Time Information Dissemination for CMVs $2,500,000 Installation 3/2025 48 121648 Culpeper Interchange Lighting at Exit 99 $2,700,000 Scoping 10/2026 49 121698 NOVA Dynamic Ramp Metering I-66 & 1-395 $1,100,000 Scoping 8/2025 50 | 121775 | Lynchburg ATSPM Technical Upgrades and Enhancements $1,200,000 Scoping 4/2025 Route 288 Hard Shoulder Running (HSR) Technology Feasibility Study (UPC 122145) and Design & 51 122145 Implementation (UPC 122147) $39,561,735 Scoping 2/2027 Partially funded ITTF; Majority of funding CVTA & 52 | 122451 | Statewide High Speed Communications for Signals $475,000 Installation 12/2024 53 | 122764 Hampton Roads | Hampton Roads Bridge Tunnel Over-Height Technology $10,000,000 Design 7/2026 25 | 2023 ITTF Innovation and Technology Transportation Fund (ITTF) Report to the General Assemby 2023
File and source
- File
- 2024-RD251.pdf
- Size
- 2,367,583 bytes
- SHA-256
- b6b87fae7eb9e67ec338f44f4c12905859bd5268567b7dd28ecd90600dd51021
- Our copy
- 2024-RD251.pdf
- Original
- No public link identified.