Pandemic Darlings The pandemic economy, in original documents
Home Source documents Rural Clean Energy Economics and Community Engagement Study — Washington State Department of Commerce (2024)

Rural Clean Energy Economics and Community Engagement Study — Washington State Department of Commerce (2024)

Summary

Report to the Legislature, dated November 15, 2024, on rural clean energy economics and community engagement, prepared for the Washington State Department of Commerce. The executive summary says the community engagement included 44 individual and small-group conversations, three focus group interviews, three in-person, community-based public meetings and one statewide virtual public meeting. It states that the total operating capacity of 10 operating utility-scale projects is 823 MW. It says average lease rates identified through public sources range from approximately $200 to $1,000 per acre for solar leases and $3,000 to $4,000 per MW capacity for wind leases. Eight recommendations are provided.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Rural Clean Energy Economics and Community Engagement Study — Washington State Department of Commerce (2024).” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2024-commercereports-rural-clean-energy-final-7c1c334f-7563-4d5b-bb1a-2289e756d0/, SHA-256 b114e2fe353ad56f086e3a51868c9de70d236b996431257558942cf36d688258.

Full text

Rural Clean Energy
Economics and Community
Engagement Study and
Report
Pursuant to Sect. 307(2) of Chapter 230, Laws of 2023




                                               November 15, 2024

                                               Report to the Legislature

     ENERGY                                    Director Mike Fong

v3.5.1
Acknowledgments
Washington State Department of Commerce
Michael Furze, Assistant Director, Energy Division

Glenn Blackmon, Director, Energy Policy Office

Aaron Peterson, Senior Energy Policy Specialist,
Rural and Agricultural Energy

This report was prepared for the Washington
Department of Commerce by:


Ross Strategic

Industrial Economics, Inc.

The Clean Energy Transition Institute



1011 Plum St. SE
P.O. Box 42525
Olympia, WA 98504-2525

www.commerce.wa.gov

For people with disabilities, this report is available on
request in other formats. To submit a request, please
call 7-1-1 and ask to be connected to 360-725-4000.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   2
Table of contents
Executive summary .........................................................................................................................................4

Introduction ..................................................................................................................................................11

Community engagement ...............................................................................................................................12

Findings: Community engagement ................................................................................................................14

Economic analysis ........................................................................................................................................26

Findings: Geographic distribution of large energy projects ............................................................................31

Findings: Land use ........................................................................................................................................45

Findings: Financial returns to property owners ..............................................................................................51

Findings: Tax revenues and public services ..................................................................................................57

Findings: Evaluation of direct, indirect, and induced jobs in construction and operations ..............................69

Findings: Evaluation of potential economic development assistance and impact mitigation payments .........77

Recommendations ........................................................................................................................................84

Appendix A: Methodology Details .................................................................................................................91

Appendix B: Economic and Financial Case Studies ......................................................................................106




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                         3
Executive summary
The 2023 Washington State Legislature directed the Washington State Department of Commerce (Commerce)
to develop and submit a study and legislative report addressing direct and related issues and concerns across
rural Washington regarding clean energy development in Sect. 307(2) of Chapter 230, Laws of 2023 (HB
1216).1

The Rural Clean Energy Economics and Community Engagement Report (Rural Clean Energy Study) included
community engagement with rural communities from January through July 2024, and an analysis of the
economic and financial impacts of utility-scale clean energy projects in rural communities.

The community engagement process included 44 individual and small-group conversations; three focus group
interviews; three in-person, community-based public meetings; one statewide virtual public meeting; and
collection of public comment through an online portal. The consultant team also reached out to several tribes
for their perspectives on clean energy development. Feedback was compiled, analyzed, and thematically
synthesized to reflect what communities said about the opportunities and challenges of clean energy
development.

The economic and financial impacts analysis reviewed existing and planned utility-scale clean energy projects
larger than one megawatt (MW) constructed in rural Washington communities since 2019. The analysis
quantified the distribution and magnitude of the economic impacts of these projects to inform
recommendations for how costs and benefits could be more equitably distributed to, among, and within rural
communities.

Eight recommendations are provided here reflecting the results of this community engagement and economic
analysis. These actions could reduce concerns expressed about development of the clean energy resources
that Washington needs to meet its climate requirements and serve its growing economy.


Community engagement – what we heard from communities
Rural clean energy development
Rural community members and representative interests2 offered these perspectives as challenges and
concerns about clean energy development:

       •   Lack of local control and input on decision-making: Decision-making about utility-scale clean energy
           projects is not transparent and occurs outside of the local community and without adequate
           community involvement.
       •   Skepticism about decarbonization in Washington: The state’s contribution to global emissions
           reductions is miniscule, and communities have other competing priorities.
       •   Lack of sustainable, direct local benefits: Large-scale projects bring very few lasting local benefits;
           benefits are “exported” along with the energy that is generated to other parts of the state and country at
           the expense of local communities.




1
    “Concerning Clean Energy Siting.,” Chapter 230, Laws of 2013 (HB 1216).
2 The term “representative interests” is used throughout this document and refers to persons with a technical, jurisdictional, and/or

representative role in clean energy development in rural Washington communities.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  4
   •   Quality of life and environmental impacts: Large-scale clean energy projects harm the natural
       landscape, tourism, and recreation. Negative environmental impacts over the lifecycle of clean energy
       infrastructure outweigh the benefits.
   •   Unrealistic expectations: Washington, and rural communities in particular, lacks the resources,
       infrastructure, and technical expertise to meet increased future energy demands with clean energy
       resources within the timeline set by the Legislature.

Along with challenges and concerns, rural community members and representative interests highlighted
perceived benefits and opportunities:

   •   Independence, reliability, resilience, and affordability: Clean energy, especially community-scale
       projects, can increase energy independence, reliability, and resilience and has the potential to decrease
       energy costs.
   •   Agricultural community opportunities: Clean energy projects can support farmers by providing
       additional income to supplement farming operations.
   •   Leadership on clean energy and climate change: Leadership on clean energy and innovation positions
       the state to attract investment and provide economic opportunity.
   •   Improved health: Switching to cleaner forms of electricity cleans the air and reduces harmful waste
       and pollution.

Community members and representative interests offered several suggested solutions related to the
challenges and concerns of clean energy development:

   •   Emphasize community-scale clean energy: Focus clean energy development and state support on
       smaller community-scale projects, including micro-hydro and co-generation.
   •   Revise energy permitting and grant application processes: Create more efficient and inclusive
       processes for siting and permitting.
   •   Streamline grant application processes: Support rural communities’ ability to secure funding for
       community-scale clean energy projects.
   •   Increase collaboration with rural communities: Increase collaboration between the state, counties, and
       local communities to determine where clean energy projects could be most effectively sited to reduce
       negative local impact.
   •   Provide greater opportunities for community engagement: Create opportunities for engagement to
       increase community agency, education, participation, and transparency.

Economic and financial impacts
When asked about the economic and financial impacts of clean energy development, community members
and representative interests raised the following challenges and concerns:

   •   Taxes and revenue: When taxes are levied at the local level, property tax revenues from clean energy
       projects are inconsistent over time as their assets depreciate. The increase and later decrease can
       leave communities with ongoing fiscal obligations.
   •   Employment: Most employment benefits occur at the beginning of the project during the construction
       phase and diminish over time. Lack of training opportunities for the local workforce could preclude
       them from participating in clean energy development activities at all.
   •   Loss of agricultural land and farms: Conversion of agricultural lands and loss of farm jobs and revenue
       from clean energy projects can have significant negative impacts on rural communities.



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                         5
Community members also associated economic and financial benefits with rural clean energy development:

   •   Community economic benefits: There is the potential for increased local tax revenue, mitigation
       payments, community benefits associated with a developer’s engagement in rural communities, and
       creation of some longer-term jobs associated with post-construction employment.
   •   Developing a clean energy industry: A growing clean energy industry could attract additional
       investments in community services and infrastructure.
   •   Individual economic benefits: There could be more affordable energy costs for all, and benefits to
       landowners who receive lease payments from clean energy developers.

Community members and representative interests expressed several solutions to address the challenges and
concerns related to the economic and financial impacts of clean energy development:

   •   Create Community Benefits Agreements (CBAs): More needs to be done to ensure that local
       communities receive the benefits of the clean energy projects in their areas, and developers should use
       CBAs as a tool in negotiations with rural communities.
   •   Update tax structures: Explore alternative tax or payment designations for clean energy development
       that advantage rural communities.
   •   Guarantee local employment: Address community concerns about job displacement and sustained
       local economic benefit with local labor agreements.

Tribal considerations
The Legislature, in enacting the 2023 clean energy siting law, recognized the high priority of protecting the
interests of federally recognized Indian tribes when developing clean energy projects. The law includes
multiple specific provisions addressing tribal interests. However, the scope of thisTribal interests in clean
energy siting have been conveyed to state officials in a variety of tribal engagement processes and
government to government meetings including the Centennial Accord over the last three years. However, the
scope of this particular community engagement project and report does not include a comprehensive
assessment of those tribal interests and concerns. The consultant team heard several comments during
workshops and focus groups suggesting actions to strengthen protections of tribal interests, and some tribal
citizens participated in workshops or focus groups. However, the scope of this project included neither
comprehensive engagement nor formal consultation with federally recognized Indian tribes. We understand
tribal governments to be leaders in clean energy work and request the opportunity to complete targeted
engagement and listening sessions so that tribal experience and insights can be included in energy siting
work.

Economic analysis
Geographic distribution of large energy projects
The Rural Clean Energy Study evaluated the geographic distribution of clean energy development by mapping
operating and planned projects and identifying how projects varied by technology, size, and acreage. Key
findings include:

   •   Since 2019, 20 utility-scale clean energy projects were developed or are planned in Washington. The
       majority are solar energy (65%) and onshore wind energy (30%).
   •   Of these 20, 10 utility-scale projects were developed and are operating. Four of these are west of the
       Cascades, and six are in the southern portion of the state east of the Cascades.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                          6
    •    The total operating capacity of these 10 operating utility-scale projects is 823 MW, with four projects
         that are over 100 MW of capacity each. The four largest projects are Rattlesnake Flat Wind in Adams
         County, Lund Hill Solar in Klickitat County, Skookumchuck Wind in Lewis/Thurston County, and
         Tucannon Wind in Columbia County. Clusters of both recently sited and older wind projects are in
         Klickitat County along the border with Oregon and in the southeast in Columbia and Garfield counties.
    •    10 utility-scale projects are planned, proposed, or currently under construction. All 10 projects are in
         central or eastern Washington. Seven have the capacity to produce over 100 MW each. Douglas County
         would have its first utility-scale clean energy project. Yakima County has two planned clean energy
         projects and one solar photovoltaic project (Goose Prairie Solar) currently under construction.
    •    Recent clean energy projects are in communities with higher populations identifying as white and
         non-Hispanic and lower percentages of the population that have received a high school diploma or
         equivalent compared to Washington state averages.

Effects on other rural land uses
Some community members expressed concern that clean energy projects could adversely affect local
communities’ economies, both in terms of losing productive agricultural lands, and potentially reducing the
area’s attractiveness for tourism, recreation, or other development activities. This study evaluated the impacts
of recent utility-scale clean energy projects on local land uses, including agriculture, and examined whether
these developments negatively affected tourism or recreational activities.

Key findings include:

    •    Case studies suggest that onshore wind energy development projects in Washington have a relatively
         small footprint on surface lands, typically requiring approximately 2% of the total project area for
         project operations, with the remainder retaining its original land use.
    •    Wind projects sited primarily on agricultural lands resulted in negligible observable changes pre- and
         post-construction in harvested crop acreage within the project area. The infrastructure for the utility-
         scale wind projects examined occupied between 2-4%, or between 390 and 480 acres, of total project
         acreages that ranged from 10,000 to 25,000 acres.
    •    Due to the density of required infrastructure, the solar energy projects among these case studies
         required conversion of most pre-existing land uses in areas inside the established project fence lines
         for solar development. Other land uses are precluded by the presence of the solar panels as well as
         fences erected around the panels. The area converted to solar energy development for the case study
         solar projects ranged from 73 to 1,700 acres of total project acreage, which ranged from 73 to 3,200
         acres.3 Prior land uses for developed solar projects typically included grazing. However, some planned
         projects would be located on active farmland.

Financial returns to property owners
Community members and lawmakers asked whether leasing lands for clean energy projects is beneficial or
harmful to landowners. Primary concerns include both short- and long-term community impacts, as well as
whether adjacent landowners could be affected by these projects. This study evaluated how clean energy
development affects financial returns for landowners.




3 One small site (73 acres) was considered entirely developed.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                              7
Landowners have several factors to consider when deciding to lease their land for clean energy development.
The key decision for property owners is whether lease payments outweigh the potential revenues from existing
land uses, most commonly agriculture and timberland.

Key findings include:

   •   Both wind and solar energy development project lands are typically leased by project developers
       rather than purchased outright. Property owners within leased areas usually enter into lease
       agreements with the project owners for a pre-development period (typically ranging from two to five
       years). After the design of the project is established, landowners of parcels on which physical
       infrastructure is developed are further compensated on a per acre basis at an established fee.
   •   Lease payments are often distributed on a per acre or per MW basis (or both). Lease payments can
       take many forms and may vary in magnitude by project phase. The size of payments depends on the
       size (i.e., acreage) of the lease for solar, or the number or size (i.e., MW capacity) of sited turbines for
       wind. Average lease rates identified through public sources range from approximately $200 to $1,000
       per acre for solar leases and $3,000 to $4,000 per MW capacity for wind leases. Landowners may
       receive additional payments such as a bonus, access (e.g., roads or transmission lines), or a
       combination of such payments and lease payments. These agreements are generally confidential to
       the parties engaged, although agreements with public entities are sometimes made public.
   •   Lease payments are likely to exceed the agricultural crop revenue on a per acre basis after adjusting
       for the costs of production. This was true for wind and solar case study projects with agricultural or
       grazing activity, though, as noted above, wind energy leases have a relatively small footprint and allow
       continued agricultural crop farming around the turbines, while solar projects in the case studies do not.
   •   Based on a literature review, adverse effects on property values ranged from 0-6% between pre- and
       post-construction, regardless of property location and project type. The consultant team assessed
       property values and conducted a literature review of recently published research on property values and
       large clean energy projects from across the U.S., finding the compared assessed values consistent with
       published literature.

Effects on local tax revenues and public services
While clean energy projects bring tax revenues to counties and other local jurisdictions, questions were raised
about whether the additional revenues are sustained over time and how the changes to tax payments affect
the jurisdictions in which they are located, particularly as projects depreciate.

This study examined effects on local tax revenues and public services, with key findings that include:

   •   State and local taxes are collected from clean energy projects in three primary methods: Real property
       tax (land and buildings), personal property tax (equipment and machinery), and sales tax.
   •   Across case study projects, clean energy projects contributed far more to total county personal
       property taxes than real property taxes due to the high values of equipment assessed at these sites.
       For the six operating projects, estimated payments in year one of operations ranged from $140,000 to
       $2.1 million for personal property, while real property payments ranged from $5,600 to $67,000.
   •   While assessed values for equipment are high following project construction, they depreciate over
       time, which reduces local taxes collected over time, all else equal. In the case studies, additional
       project investments resulted in slower depreciation in taxes over time than would otherwise be
       expected from the depreciation schedule.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                            8
    •   Sales tax is collected on all labor and materials purchased for a project, which primarily occurs during
        the construction phase. Sales tax is levied separately from property tax, with a statewide sales tax rate
        of 6.5%, plus an additional county and local sales tax, which is typically 2%.
    •   All counties with operating projects experienced an increase in local tax revenues relative to previous
        land uses. The additional collections represented nearly half of countywide tax collections for several
        years following project construction in some smaller counties. For counties with a smaller tax base,
        clean energy projects comprise a larger share of total property taxes (inclusive of real and personal
        property). Potential increases in tax revenues can also benefit school funding and local services.
    •   While counties have authority to assess parcels that contain clean energy development, some county
        officials noted that they lack the expertise to conduct these assessments or advocate for themselves
        upon appeal by developers.
    •   However, a drawback of central assessment is that county officials may not be able to anticipate
        changes in assessed values from year to year. Officials noted that they often receive updated
        assessments from the state Department of Revenue (DOR) close to the end of the budget development
        period, offering little time for budget adjustments in response to changes.
    •   County officials also expressed concern about the 2023 law (Chapter 82.96 RCW)4 that allows
        projects to be exempt from state personal property tax in favor of a new clean energy production
        excise tax. Assessors noted that the law dictates the taxing districts may receive funds distributed to
        counties from the excise taxes, which may adversely affect some districts. As written, the bill is
        intended to solely apply to the state portion of personal property taxes. However, county officials fear
        that the law may be updated to include both state and county tax collections, which could substantially
        alter how funds are distributed within the county taxing districts.

Due to these concerns and others, such as the depreciation of projects over time, some county officials
suggested taxing clean energy projects as a standalone tax category instead of as personal property.

Direct, indirect, and induced jobs in construction and operations
Clean energy projects can generate jobs during construction and annual operations. In Washington, there are
no public data sources that report total project development costs or total local employment generated by
clean energy projects, and developers are not required to submit these statistics. In the absence of project-
specific data, this study uses regional economic models to estimate the total costs of projects and their
regional economic impacts, including both construction and operations-related jobs.

    •   Clean energy projects provide a substantial number of jobs during construction, but relatively few
        direct construction jobs for local hires. Most clean energy equipment is manufactured outside
        Washington, and the required technical expertise limits the extent of local employment during
        construction and operations. Companies prefer to deploy specialized crews for constructing clean
        energy infrastructure, which are often mobile crews from outside the state. However, some local
        general construction labor was reported to have been used for clean energy project development.
        Construction jobs in the state are estimated to range from two to 10 jobs per MW.
    •   Clean energy projects provide a modest number of permanent jobs during project operations.
        Operations jobs are typically local because of the need for frequent site visits. One county
        representative said that during project operations, employees typically live nearby, and agreed with the




4 https://app.leg.wa.gov/billsummary?BillNumber=1756&Initiative=false&Year=2023




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                             9
       modelled job creation estimates that project operation requires approximately one quarter of a full-time
       equivalent job per MW.
   •   There are some incentives to increase use of local employment, but little evidence of their
       effectiveness. The state tax exemption encourages projects to hire local workforces to receive reduced
       state sales and use taxes owed on machinery and equipment. While one project had such an
       agreement (Rattlesnake Flat), data were not available to confirm whether the agreement resulted in
       additional use of local labor.

Recommendations
The following recommendations are informed by and emerged from the community engagement and the
economic and financial analysis documented in this study. They are explained in more detail in the
Recommendations section of this report.

   •   Strengthen local involvement in clean energy siting and project development processes to ensure that
       rural communities are informed and have a meaningful role in the decision-making process.
   •   Ensure increased rural community benefits and mitigate potential harm from clean energy projects.
   •   Safeguard and enhance the quality of life in rural communities as clean energy projects are developed.
   •   Improve transparency in the planning, development, and operation of clean energy projects.
   •   Explore an alternative taxation approach for large clean energy projects.
   •   Improve communication about sales taxes and clarify expectations about payback timelines for
       developer rebates.
   •   Increase transparency of economic and financial data reporting.
   •   Improve documentation of federal and state incentives.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                      10
Introduction
Background
The Legislature directed Commerce to prepare a report addressing direct and related issues and concerns
across rural Washington regarding clean energy development in Sect. 307(2) of Chapter 230, Laws of 2023
(HB 1216). This study would address direct and related issues and concerns across rural Washington
regarding clean energy development.5

Commerce contracted a consultant to provide third-party neutral services for the design and implementation of
the rural engagement and economic analysis required by this legislation. Ross Strategic6 led the consultant
team, partnering with Industrial Economics, Inc. (IEc),7 and the Clean Energy Transition Institute (CETI).8 The
Rural Clean Energy Economics and Community Engagement Report (Rural Clean Energy Study) is not affiliated
with or in support of any clean energy development project. The timeline to complete all aspects of the Rural
Clean Energy Study is in Table A1 in Appendix A.


Legislative mandate
The Legislature directed Commerce to prepare a report addressing direct and related issues and concerns
across rural Washington regarding clean energy development in Sect. 307(2) of Chapter 230, Laws of 2023
(HB 1216):

     (2)(a) The department must complete a report on rural clean energy and resilience that takes into consideration the
     consultation with rural stakeholders as described in subsection (1) of this section. The report must include
     recommendations for how policies, projects, and investment programs, including energy facility siting through the
     energy facility site evaluation council, can be developed or amended to more equitably distribute costs and benefits
     to rural communities. The report must include an assessment of how to improve the total benefits to rural areas
     overall, as well as the equitable distribution of benefits and costs within rural communities.

     (b) The report must include a baseline understanding of rural energy production and consumption, and collect data
     on their economic impacts. Specifically, the report must examine:

              (i) Direct, indirect, and induced jobs in construction and operations;

              (ii) Financial returns to property owners;

              (iii) Effects on local tax revenues and public services, which must include whether any school districts had a
              net loss of resources from diminished local effort assistance payments required under chapter 28A.500 RCW
              and impacts to public safety, the 911 emergency communications system, mental health, criminal justice, and
              rural county roads;

              (iv) Effects on other rural land uses, such as agriculture, natural resource management and conservation, and
              tourism;




5 This study does not rely on a specific definition of clean energy projects, using the term more generally to include projects that

produce electricity without burning fossil fuels. Rural areas are identified in Table A6 and A7 in Appendix A.
6
  “Ross Strategic,” n.d., https://www.rossstrategic.com/.
7 “Industrial Economics Inc.,” n.d., https://indecon.com/.
8 “Clean Energy Transition Institute,” n.d., https://www.cleanenergytransition.org/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                 11
           (v) Geographic distribution of large energy projects previously sited or forecast to be sited in Washington;

           (vi) Potential forms of economic development assistance and impact mitigation payments; and

           (vii) Relevant information from the least-conflict priority solar siting pilot project in the Columbia basin of
           eastern and central Washington required under section 607, chapter 334, Laws of 2021.

    (c) The report must include a forecast of what Washington's clean energy transition will require for siting energy
    projects in rural Washington. The department must gather and analyze the best available information to produce
    forecast scenarios.

    (d) By December 1, 2024, the department must submit a final report on rural clean energy and resilience to the joint
    committee on energy supply, energy conservation, and energy resilience created in RCW 44.39.010 and the
    appropriate policy and fiscal committees of the legislature.

Purpose
This study is designed to help Commerce meet the state’s clean energy and climate laws by:
   • Increasing mutual understanding between rural communities, representative interests, government
       agencies, and policymakers about the potential opportunities and impacts of clean energy development
       in rural communities.
   • Developing detailed analysis of the direct and indirect economic and financial impacts of clean energy
       projects.
   • Engaging with representative interests and rural communities.
   • Informing policies and programs.


Community engagement
Methodology
The consultant team prepared a detailed Community Engagement Plan for the study outlining goals,
audiences, and engagement methods. The plan was updated as new information emerged throughout the
process. The goal of the rural community engagement was to focus on the interests of rural communities and
to provide Commerce and the Legislature with actionable information to understand the opportunities,
challenges, and potential impacts of rural clean energy development. The results of this engagement will
inform rural clean energy development policies and programs.

Throughout this process, the consultant team was clear about the purpose of the engagement, employed a
consistent and focused set of topics and questions, and described how qualitative and quantitative data would
be used to inform future decisions.


Engagement process
The engagement process included individual and small-group conversations through interviews, three
community-based public meetings, three focus groups, and one statewide virtual public meeting. The
consultant team also collected comments online through a public-facing project website. Interviewee and
focus group affiliations are detailed in Table A2 in Appendix A, and the number of online comments by county
of origin is in Table A3 in Appendix A. The consultant team provided opportunities for representative interests
to review and comment on the design of the study and the draft report, and selected tribes potentially engaged


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       12
in community and utility-scale clean energy development to participate in an interview and/or review the draft
report

Public-facing website
The consultant team collaborated with Commerce to develop a public-facing website for the Rural Clean
Energy Study.9 The consultant team regularly posted education and outreach materials about the state’s
energy laws, the role of clean energy, and key information about engagement opportunities and outcomes for
rural engagement throughout the study period.

Interviews
The consultant team conducted 44 interviews from April through July 2024.10 The consultant team worked
with Commerce to identify individuals and an interview strategy to gain insights into key rural clean energy
issues. The team also worked with Commerce's regional Community Engagement unit staff to identify local
contacts and develop interview questions.

With assistance from Commerce, the consultant team conducted outreach to key contacts, providing relevant
background information for the project, including the legislative requirement for this study, the goals for
engagement, and how the interview findings would be used.

The consultant team synthesized interview findings with written summaries of key discussion points, insights,
and action items from all group and community meetings, all of which were shared with Commerce.

Focus group meetings
In consultation with Commerce, the consultant team identified and met with three focus groups (21 people).
These included county commissioners, non-governmental organizations, the Washington Energy Facility Site
Evaluation Council (EFSEC), and county assessors.

Public meetings
The consultant team held three in-person community public meetings in rural western, central, and eastern
Washington, plus one virtual statewide meeting. The team selected locations, dates, and times in consultation
with Commerce. Simultaneous Spanish-language interpretation services were provided at each meeting. See
Table 1.

Table 1. Summary of public meetings
Meeting Location                               Date and Time                                 Number of Attendees

Dayton                                         May 14, 2024: 6:30 - 8:30 P.M.                49

Zillah                                         May 15, 2024: 6:30 - 8:30 P.M.                12

Mount Vernon                                   May 16, 2024: 6:30 - 8:30 P.M.                20



9 Washington State Rural Clean Energy Study, n.d., https://ruralcleanenergywashington.org/


10 Tribal Nations not included in the interviews were invited to review the draft report and advise the consultant team on any key

missing issues.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               13
 Meeting Location                                Date and Time                            Number of Attendees

 Virtual                                         June 5, 2024: 6:30 - 8:30 P.M.           148

 Total attendees                                                                          229

The consultant team shared summaries of each meeting on the study website. 11


Online comments
The consultant team provided an online comment option on the project website. There were 143 comments
received during the study. The consultant team incorporated these online comments in the final report.

Tribal considerations
The Legislature, in enacting the 2023 clean energy siting law, recognized the high priority of protecting the
interests of federally recognized Indian tribes when developing clean energy projects. The law includes
multiple specific provisions addressing tribal interests. Tribal interests in clean energy siting have been
conveyed to state officials in a variety of tribal engagement processes and government to government
meetings including the Centennial Accord over the last three years. However, the scope of this particular
community engagement project and report does not include a comprehensive assessment of those tribal
interests and concerns. The consultant team heard several comments during workshops and focus groups
suggesting actions to strengthen protections of tribal interests, and some tribal citizens participated in
workshops or focus groups. However, the scope of this project included neither comprehensive engagement
nor formal consultation with federally recognized Indian tribes. We understand tribal governments to be
leaders in clean energy work and request the opportunity to complete targeted engagement and listening
sessions so that tribal experience and insights can be included in energy siting work.


Engagement analysis
The consultant team compiled information collected from all interview phases, online engagement, and in-
person/virtual meetings to support the analysis and synthesis of findings. The team reviewed these data to
identify common themes and examples to support these themes, and then synthesized those themes to reflect
rural communities’ insights about the opportunities and challenges of clean energy development.


Findings: Community engagement
The findings from the Community Engagement process are grouped thematically under three broad headings:
Clean energy development; and Economic and financial impacts.

The first two sections (Rural clean energy development and Economic and financial impacts) are organized by
challenges and concerns, benefits and opportunities, and proposed solutions to challenges — including
suggestions for improvements to outreach and engagement. The findings reflect the viewpoints of community
members.




11 Washington State Rural Clean Energy Study, n.d., https://ruralcleanenergywashington.org/




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                          14
Community engagement – Clean energy development
Challenges and concerns
Lack of local control and input on decision-making
One of the consistent themes throughout the outreach and engagement process was concern with decision-
making that occurs outside of the local community. This included the sentiment that the Governor’s Office and
Legislature are pursuing clean energy development regardless of rural concerns and considerations.
Community members noted that efforts to preserve farmland are overridden by state decisions to site clean
energy projects and energy infrastructure.

Many community members said that counties are unable to properly permit solar or wind facilities on
agriculturally designated lands due to the Growth Management Act, while EFSEC has the authority to site clean
energy projects on these lands.

Rural community members emphasized that interest in local control should be interpreted as an interest in
having a role in the decision-making process, and not an attempt to block clean energy development.
Community members at both the Dayton and Zillah meetings said that having a meaningful role in the
decision-making process would increase the ability of counties to “get to yes.”

Community members also mentioned a lack of transparency during clean energy project development, noting
that project developers communicate directly with landowners but not with the broader impacted community.
This results in a lack of information and ability to effectively provide input on potential projects.

Lastly, community members said that rural communities generally oppose government mandates or decision-
making from outside of their communities: “People are feeling this downward economic pressure from
legislation, so they are viewing this antagonistically…the west [of the state] is coming in and doing this to
them.”

Ideological opposition
Ideological opposition was more pronounced among the rural communities in Eastern Washington than
Western Washington, which could be due to the greater number of existing and planned wind and solar
projects in Eastern Washington.

Some individuals cited ideological differences between urban and rural communities as a significant
challenge, with more rural communities generally opposed to clean energy development. Energy infrastructure
build-out has historically not been a partisan issue.

Some commenters on the project website expressed strong ideological opposition to clean energy projects,
including skepticism about the impact of climate change and distrust of government mandates.

In some areas, build-out of clean energy projects is considered a pretext for dam removal, particularly in
communities around the lower Snake River dams, which people mentioned several times. Some interviewees




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                       15
said that this Rural Clean Energy Study does not include analysis of hydroelectric projects and is therefore
biased against such projects as part of a clean energy economy.12

Skepticism about decarbonization
Another theme that emerged related to ideological opposition was general skepticism about the need to
decarbonize the state’s energy system. According to some interviewees and comments, Washington’s grid is
already mostly ‘green’ from hydropower, which makes additional wind and solar energy (and other clean energy
sources) unnecessary: “Our PUDs [Public Utility Districts] are 80-90% clean to begin with – mostly hydro, either
Bonneville, or projects owned by PUDs.”

Individuals noted that even assuming the need to decarbonize the energy system, rural communities question
whether the Clean Energy Transformation Act (CETA) timelines are realistic. Some community members noted
a related sentiment that wind and solar potential is greater in other areas or neighboring states (e.g., there is
more wind potential in Montana), so “why are we developing here?”

Some commenters suggested that clean energy projects are unnecessary and a misuse of taxpayer money,
advocating instead for continued investment in fossil fuels. Commenters also raised concerns about the
influence of high-tech companies and foreign entities on clean energy policies.

Some community members attributed skepticism to a general lack of information and understanding of the
state’s climate commitments. They noted a lack of information about the state’s overall climate strategy,
future energy needs, what is required of utilities, and what incentives are available to utilities, ratepayers, and
communities in the clean energy transition.

Lack of direct, sustainable local benefits
Some individuals said that rural communities were concerned about clean energy projects built locally when
the energy they produce is sent to serve population centers in Western Washington. As one interviewee stated,
Eastern Washingtonians have a sense “of being an energy colony, where Western Washington uses all the
energy and Eastern Washington has to produce it.”

An additional concern is that energy produced in Washington is often exported to other states, undermining the
argument that more clean energy production is needed to meet Washington’s decarbonization goals.

Interviewees also cited government programs designed to create economic opportunities, such as the
American Recovery and Reinvestment Act (ARRA) that provided a one-time infusion of funding for
weatherization, as an unsustainable investment model, emphasizing that programs should ramp up and down
gradually, not “boom and bust.”

Quality of life impacts
Many individuals commented on the impacts to quality of life in rural areas resulting from clean energy
development. Some community members noted that people living in rural communities value the natural
landscape and are opposed to large energy projects that would disrupt it. Website commenters frequently




12 The economic analysis for this study is focused on utility-scale (greater than 1 megawatt (MW)) clean energy projects constructed or

proposed in Washington since 2019. For this analysis, the consultant team considered a wide range of clean energy technologies,
including hydropower. However, there have not been any hydropower projects constructed since 2019 and thus no hydropower projects
were evaluated in detail.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              16
mentioned concerns about the visual impact of large wind and solar projects, the loss of natural landscapes,
and potential negative effects on tourism.


   Horse Heaven Clean Energy Center. Several interviewees mentioned the challenges associated with the Horse
   Heaven clean energy project. For instance, they mentioned a lack of information about project maintenance and
   longevity, lack of public outreach, and the size of the project relative to its anticipated energy production. Overall,
   the project was seen by local communities as pre-determined regardless of public input.



There were also comments about noise, light pollution, and the general aesthetic degradation due to these
projects, ruining the “desolate beauty” of rural areas.

Some individuals expressed concern that siting solar or wind farms might conflict with efforts in their
communities to diversify their economies through tourism. Some of these impacts are quantifiable, such as
tourism revenue and property values, while others are qualitative, such as the effect of light flickering from
spinning wind blades (also known as wind turbine shadow flicker).

Environmental impacts
Throughout interviews, public meetings, and comments submitted through the website, several individuals
raised the topic of environmental issues associated with clean energy development. Concerns ranged from
impacts of wind turbines on avian populations to groundwater contamination from solar farms. In one case, an
interviewee reported both: “People say solar kills birds, and the chemicals used to clean them [solar panels] get
into groundwater.” A community member said that farming is heavily regulated to avoid impacts on
endangered species, whereas clean energy developers do not receive a commensurate level of scrutiny.

Water use and water rights were also areas of concern. Water is used for project dust abatement and cleaning,
and any additional water use increases pressure in areas where water is a scarce resource. One individual also
expressed concern over the impacts of groundwater recharge associated with large solar farm installations.

Communities were also concerned with increased wildfire risk from clean energy projects, with battery storage
facilities specifically mentioned as a source of fire hazard. This concern extended to the ability of firefighters
to effectively contain wildfires in areas with wind and solar farms, and the lack of firefighter training around
electrical and battery fires. Individuals mentioned the potential cost increase for homeowners’ fire insurance
and noted that some California communities are losing fire insurance coverage entirely.

Many individuals suggested that developers should pay for the equipment and training that first responders
need to ensure a proper response and minimize the potential for loss of property and life if there is an
emergency at an energy facility.

Lifecycle impacts
Community members noted that the carbon footprint of clean energy projects, when analyzed through the
entire lifecycle, is significant. The concrete, steel, and other materials that make up a clean energy project,
combined with the carbon impacts from transporting the equipment and installing it, cast doubt on the actual
greenhouse gas reduction benefits.

Additionally, communities were concerned with “who cleans up the mess,” or ensuring that clean energy
equipment is dealt with through end-of-life (e.g., ensuring proper disposal of used wind turbine blades).



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       17
Community members also commented that post-construction land restoration is inadequate, stating that
concrete pads for wind turbines remain in perpetuity even after project decommissioning.

Energy demand, capacity, and technical constraints
Some individuals noted general concern with the ability of existing transmission and distribution to handle
future electricity resources once they come online. Interviewees posed the question: If natural gas is eventually
phased out of homes, how will the transmission and distribution system handle the additional demand from
households for electricity?

Community members interested in increasing economic growth in rural counties were also interested in the
ability of the energy system to support manufacturers or other economic contributors seeking to locate to their
area.

A related theme from community members was that many rural counties and smaller utilities do not have the
capacity and/or technical expertise to respond to grant opportunities for clean energy proposals. There is also
a potential capacity constraint in the number of non-governmental organizations that operate in rural
communities – there may be too few, and existing organizations are small and capacity-constrained.

Utility interviewees commented that residential and community solar and other distributed energy generation
create additional costs for utilities to integrate with other generation sources. Utilities also noted that less
reputable rooftop solar installation companies overpromise about benefits, such as increased home value
from installing solar panels, energy savings, or claiming that battery backup is available. Utilities are often put
in the position of responding to customer complaints about these practices.

Benefits and opportunities
Independence and resilience
Some rural community members noted that clean energy development can provide improved resiliency for the
overall energy system, particularly in the face of increasingly extreme weather events, such as droughts,
wildfires, and flooding.

Locating clean energy sources closer to demand or load centers with adequate distribution systems could
provide an opportunity to reduce infrastructure costs. Furthermore, community-scale clean energy projects
offer independence and resilience in the face of increasing grid failures and grid load pressure.

Reliability and affordability
Some community members said they would support clean energy if it could increase reliability and
affordability of electricity, which is often more important than the environmental benefits of decarbonizing the
energy system to rural areas. Many people noted reduced energy costs as a potential benefit to motivate rural
support for clean energy projects.

Agricultural opportunities
Given the prevalence of agriculture in rural communities, many people noted opportunities to deploy clean
energy in ways that benefit farmers and farmland. This included increasing the number of solar panels on farm
buildings and using the energy produced to charge electric farm equipment instead of traditional fossil fuel-
burning equipment. This could reduce exposure to fuel cost variability and improve the profit margins for
farmers.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                            18
Rural community members supported other potential energy sources on farms, such as dairy digesters and
methane capture. Leasing marginal croplands for solar or wind development can also help offset agricultural
costs and allow farmers to remain on the land. As one interviewee noted, “In many cases it helps some
farmers survive. I've seen that happen; some of them are able to whittle out a livelihood because of that
[leasing their land for clean energy development].”

Some individuals mentioned agrivoltaics (agricultural production underneath or adjacent to solar panels) as a
beneficial combination of agriculture and clean energy production. However, other feedback indicated that
agrivoltaics has not moved beyond demonstration level in Washington. Additionally, some community
members noted that the predominant crop types in Washington are not conducive to agrivoltaics.

Alternative clean energy sources
Generally, there was greater support for clean energy projects with a smaller land-use footprint. Many
individuals noted the potential for clean hydrogen and nuclear power as part of the clean energy economy,
stating that these sources would be preferable to wind and solar projects because of their smaller footprint.
Community members acknowledged uncertainties around the maturity of clean hydrogen technology, and
nuclear was mentioned in the context of small modular reactors (SMRs) rather than utility-scale reactors.

Other benefits and opportunities
Some individuals commented that the transition to a clean energy economy is an opportunity to demonstrate
leadership around the threat posed by climate change and show that rural communities can play a vital role in
this effort. One commenter wrote: “Attract investment and create jobs and economic opportunity by showing
that Washington is a leader in the clean energy transition.”

An interviewee observed that emissions reductions resulting from clean energy projects that replace fossil-fuel
facilities could improve air quality in communities.

Proposed solutions from study participants
Rural community members suggested several solutions related to the challenges and concerns that arise as
clean energy projects are proposed, sited, and developed.


   Oregon Community Renewable Energy Association (CREA). An interviewee suggested Washington should create a
   community-run nonprofit like Oregon’s CREA to provide technical assistance, advocate for counties, and generally
   bolster local decision-making. CREA supports business and economic opportunities through clean energy
   development using free enterprise principles to create economically and environmentally responsible electric
   generation in Oregon.


Clean energy permitting and other processes
Rural community members suggested analyzing the entire permitting and siting process to identify
inefficiencies, create opportunities for local engagement and participation, improve the process, and move
toward a more equitable distribution of costs and benefits of clean energy development. Suggestions included
helping counties navigate project permitting, such as utilities and developers providing funding support for
county permit reviews. Some individuals suggested streamlining the application process for state grants
related to clean energy projects and designating certain grants specifically for rural communities. Other
suggestions included:




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                19
       •   Consult with Pacific Northwest National Laboratory and Washington universities to provide expertise in
           clean energy development.
       •   Limit the number of data centers that can be sited (due to their high energy use). Require data centers
           supply their own co-located clean electricity.
       •   Develop a financial instrument, such as a reclamation bond,13 to pay for project decommissioning to
           resolve end-of-life and disposal issues.

Clean energy siting
Many rural community members suggested that opposition to clean energy projects would be less intense if
projects were sited in less visible areas to reduce the impact on people’s viewsheds. Other community
members said that locating projects on federal lands could be a more efficient solution to clean energy siting.

In general, rural community members urged greater collaboration between the state, counties, and local
communities to determine where clean energy projects would be most effective with the least amount of local
impact. One participant referred to Washington State University’s Least-Conflict Solar Siting Process14 as an
underused asset for proactively siting facilities.

Some individuals commented that concerns around battery storage facility safety could be addressed by
developing standards for reasonable distances from population centers and other safety regulations, such as
setbacks and first responder training.

Community-scale clean energy

      Yakama Tribal Solar Canal & Hydropower Project. This project is intended to convert open-water irrigation canals
      into a solar and micro-hydropower irrigation system and is an example of a local clean energy project that
      provides energy and environmental benefits to a rural area while lowering residents’ utility bills.


The consultant team heard consistent support for community-scale clean energy throughout the outreach and
engagement process, with many individuals expressing that smaller scale projects, including micro-hydro and
co-generation, should receive more state-level support.

Feedback reflected a theme that a significant quantity of clean energy is available by installing solar panels
over paved areas such as parking lots, walkways, bike paths, as well as commercial buildings and irrigation
canals. The state could, for example, enact requirements for solar installation on buildings over a certain flat
roof square footage. A larger analysis by the state could determine how a network of community-scale clean
energy and microgrids could provide clean power while minimizing environmental and social impacts.

Outreach and engagement suggestions
Throughout the outreach process, the consultant team received feedback on how to improve overall
engagement with rural communities about clean energy development.




13
     “Community Renewable Energy Association,” n.d., https://www.community-renewables.org/.
14 Washington State University Energy Program, “Least-Conflict Solar Siting,” n.d.,

https://www.energy.wsu.edu/RenewableEnergy/LeastConflictSolarSiting.aspx.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                   20
Communications strategies and channels
Rural community members said that, to address the issue of lack of local control, it is important to consider
that solar siting is generally not a controversial use of land. However, if rural community members perceive
development is being forced on them, they will oppose it for that reason alone. Typically, developers lead the
development, which is often followed by (from many in rural communities’ perspectives) an adversarial
process at the EFSEC or county level.

Rural community members recommended increasing opportunities to bring communities into the process
early and often. This should include ample opportunities for public engagement, such as listening sessions,
and proactive information distribution so people have more complete knowledge and understanding of clean
energy projects. Communities need to be more connected during the process, from solutions to benefits, and
developers should work with communities and ask what benefits they want to see.

Another suggested example for engaging rural communities earlier is using mapping tools to assess a site’s
readiness in terms of cultural and environmental considerations. A mapping process with community
members could make that site available for developers looking to site clean energy. It will be essential to
consult with tribal nations prior to any mapping activities on or near tribal lands or Usual and Accustomed
territories.

The consultant team also received suggestions from many individuals about communications channels to
reach rural community members. Suggestions included partnering with local community and economic
development organizations to convene meetings; setting up tables at local venues or hubs for communities,
such as agricultural supply stores; working through local legislators’ offices to advertise meetings; or inserting
flyers in monthly utility bills.

In addition to social media and online surveys, traditional media, such as radio, is still an effective method for
communicating information. One suggestion was to find community champions and work through them to
communicate about clean energy projects: “Messengers matter — having the right people go in and promote
these projects is crucial.”

Meeting timing is also important, adhering to key considerations for agricultural communities, which means
avoiding meetings during planting and harvesting seasons and holding meetings in the evening. Working with
local organizations would also help, as they have insight into local events.

Feedback to the consulting team also included suggestions for how to best reach out to various communities
and organizations, including engaging with Latino communities and ensuring that translated materials are
culturally appropriate. Timber cooperatives and Farm Bureau organizations were also mentioned as important
groups for engagement.

Messaging
The consulting team received multiple suggestions about the importance of realistic messaging that
resonates with rural communities, such as remaining realistic about the potential for clean energy projects.
Some community members noted that rural communities would be more supportive or willing to listen to wind
energy developers if expectations around energy production and benefits were more realistic. This desire for
realistic expectations extended to the need for transparency around lifecycle costs. Rural communities want
clear answers about what will happen to photovoltaic cells and wind turbines (or other equipment) after
reaching the end of their useful lives.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                           21
An interviewee from rural Western Washington stated that mentioning the “Green New Deal” on the
Washington coast will not resonate; instead, messages should focus on the economic realities of working
people and identifying allies in rural counties who have benefited from clean energy projects. Transparency
about real job impacts is critical, including negatives, such as construction labor crews for clean energy
projects likely coming from other areas, and positives, such as the potential for clean energy development to
provide well-paid jobs that do not require a college degree.

Education
Several individuals suggested providing more public education about clean energy projects and installing
signage at clean energy facilities demonstrating connections to institutions or indicating benefits, such as
jobs. Utilities have a significant role in public education and can continue educating local governments and the
public about the energy system and how energy — including clean energy — is used and generated.

Educational opportunities extend to the agricultural community and the perception that solar farms will lead to
irreversible conversion of agricultural lands. Interviewees suggested that real data about agricultural land
conversion from clean energy, combined with education about the greater threat to agricultural production
from climate change, could lead to increased acceptance of clean energy projects.

Community engagement – Economic and financial impacts of clean
energy
Challenges and concerns
Taxes and revenue
Participants focused on taxes and revenue when discussing challenges and concerns around the economic
and financial impacts of clean energy. An interviewee noted that in rural areas, most land is publicly owned and
therefore clean energy projects developed on these lands are not subject to local taxes.

Where local taxes are collected, increased tax revenue during the early stages of a clean energy development
project increases spending on schools, emergency medical services, flood control zones, and other
infrastructure or services. However, as the accounting value of energy assets depreciates over time, property
tax payments decrease; when this tax revenue decreases, communities are left with ongoing obligations.

For example, as wind turbines depreciate over time and wind energy companies pay less in property taxes,
many rural community members feel the burden may be shifted to local taxpayers. Rural community members
noted that clean energy project owners are aggressive in appealing15 the assessed value of their equipment
once the project construction phase is complete and the project is operational.

Concerns about local versus non-local control over taxes were paramount among multiple community
members, with many referring to the potential impacts of centrally assessed projects versus locally assessed
projects. During the Dayton public meeting, several attendees asked about the differences in taxes over time
between state-assessed and county-assessed projects and whether there were differences in taxes for utility



15
  Washington State Association of Counties, “Washington State Association of Counties Exposes Property Tax Challenges in Clean
Energy Development,” December 21, 2023, https://wsac.org/washington-state-association-of-counties-exposes-property-tax-
challenges-in-clean-energy-development/.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           22
owned versus privately owned developments. Several individuals commented that counties are hesitant to
assess project values locally due to potential appeals from project developers.

Sales taxes are also a concern for some because sales tax rebates take away funds that could otherwise be
used to support local communities.

Employment
Employment impacts were also a primary concern for participants in interviews and public meetings, and many
questioned the extent to which employment benefits accrue locally. Community members commented that tax
and employment benefits mostly occur at the beginning of the project (during the construction phase) and
diminish over time. Individuals also said that there are local economic benefits to having energy industry
workers temporarily residing in the community during the project, but that those benefits only accrue during
the construction phase.

Other participants expressed concern that labor gaps may exist and that local laborers may not have adequate
training to participate in construction activities, especially due to the highly technical nature of some clean
energy projects, which may create a high barrier to entry for local contractors.

Agricultural land conversion
Rural community residents expressed concern about losing local control over land use, and with it the
weakening of the social fabric. Multiple interviewees, public meeting attendees, and website commenters
expressed concern over losing agricultural and farmland to clean energy projects. Multiple participants spoke
about the amount of farmland already converted to solar energy projects and expressed concern over
continued conversion.

Individuals said that in addition to farmland conversion, other issues include the loss of farm jobs on a large
scale, the inability of traditional farms to compete with clean energy projects, and the disparity in land values
for traditional farms and neighboring areas with clean energy projects. Some individuals also noted concerns
for farmers who do not own land and rent acreage for agricultural operations. These individuals suggested that
tenant operators may not benefit financially from clean energy leasing agreements the way that landowners
would and could risk losing their operations and any associated jobs if their land were leased for a clean
energy project.16 Community members expressed concern that the process today increases income inequality
in rural areas and that the role of EFSEC in the system is counterproductive.

Energy costs and lack of local economic benefits
Some community members suggested that the state’s energy system is not designed to provide lower energy
costs for communities where energy is generated. Those who recognized that some communities are getting
paid through direct payments or mitigation efforts have proposed that funds or mitigation payments may not
address other concerns about impacts to local culture, ways of life, or environmental impacts, while other
participants questioned the overall economic benefits of clean energy.




16 In 2022, approximately 22% of state cropland acres were operated by tenant farmers who rent all the land they operate, 55% were

part owners who operate part of their own land and rent additional land from a landlord, and the remainder (23%) were full owners who
own all the land they operate. Pastureland had slightly lower rental rates: 9% of acres were tenant farmers, 41% were part owners, and
50% were full owners. Source: USDA. 2022 Census of Agriculture. Accessed via NASS at:
https://quickstats.nass.usda.gov/results/95F07628-C0E0-37BB-A820-3833D22565BB


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               23
There was consistent concern among participants about private versus public investment, and tax dollars
going to the development of clean energy projects. This was expressed by a Yakima resident, who said, "Our
tax dollars are going to this project, and we see no benefit in it."

Multiple rural residents raised other concerns about schools losing levy money each year as tax values shift.
Still others focused on the challenges the current model establishes for local, community-scale utilities.
Several commenters noted the lack of training, preparation, and infrastructure in small towns and among local
utilities, which often results in missing grant opportunities due to lack of staff or awareness.

Benefits and opportunities
Community benefits

   Hydropower Relicensing – direct local benefits. An example of local benefits for energy projects is the Federal
   Energy Regulatory Commission (FERC) relicensing for federally operated dam projects. Relicensing requires
   dam operators to demonstrate real community benefits (recreation, employment, etc.).


Rural community members discussed a range of benefits from clean energy projects (i.e., benefits typically
considered as within the county area, directly stemming from the project construction and operation). Some
individuals discussed the potential for increased local tax revenue from clean energy projects, and how those
could benefit the larger community through the support of tax levies (e.g., hospitals, emergency medical
services). Others focused on potential mitigation payments and benefits associated with increased developer
presence in rural communities. An individual suggested providing electric vehicle (EV) charging infrastructure
as one avenue to economic development, particularly for attracting tourism. Some participants observed that
areas around hydropower projects receive community benefits as part of these projects.

While many respondents did not think that there were many long-term jobs associated with clean energy
projects, some discussed the socioeconomic impacts associated with longer-term post-construction jobs. An
attendee at a public meeting in Dayton spoke about the ongoing local jobs that were created by wind farms.
Additionally, one participant claimed that clean energy is the cheapest source of energy and is starting to
become an economic reality. Others point to the benefit of local spending of lease payments by landowners in
the communities in which they live.

Clean energy industry development
For some individuals, the embrace of clean energy development creates a fertile environment for start-up
companies seeking to build a clean energy economy. Clean energy development, according to some feedback,
attracts investments and jobs, making Washington more competitive during the transition to a clean energy
economy. It also provides revenue and infrastructure improvements to rural communities seeking to diversify
their economies.

Individual and family benefits
Some individuals mentioned the potential for reducing household energy costs, while others focused on
landowner benefits from lease payments. Some attendees in Dayton echoed those sentiments, suggesting
that landowners can benefit from clean energy leases, especially when clean energy projects complement,
instead of replace, agriculture and ranching.

A participant stated that landowners hosting clean energy infrastructure benefit because they can keep the
land for agricultural use and avoid other types of development. Solar panels and wind turbines can exist


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                               24
simultaneously with farming and ranching while providing additional revenue to the landowner. One landowner
in Dayton spoke about wind turbines on their family’s property that are 20 years old that have been repowered
by exchanging original blades with larger ones. Their payments increased significantly with the larger blades
due to added energy production.

Proposed solutions from study participants
Community benefit agreements
Interviewees and public meeting attendees provided multiple observations regarding the potential for positive
and negative impacts of clean energy on rural communities. An overarching theme was that more work is
needed to ensure that local communities receive benefits from the clean energy projects in their areas.

Community Benefit Agreements (CBAs) were consistently suggested as a tool for developers to use when
negotiating with rural communities. CBAs are agreements signed by communities and a developer that identify
a range of benefits the developer agrees to provide in return for project support. Multiple individuals mentioned
that CBAs could be used to provide rural communities with investments they need to support clean energy
projects.

Revising tax procedures and rates
According to many community members, one solution to challenges and concerns with clean energy in rural
areas is to change the current taxation scheme, which many feel is unfair. Multiple ideas and proposals were
discussed during interviews, focus groups, and public meetings, particularly from county assessors and
treasurers.

Some of these proposals included a consistent assessment method in which the state would assess all large
projects, changing the categorization of wind and solar equipment (currently considered “personal property”
instead of “real property”), and alternative tax or payment designations altogether (e.g., a specific tax structure
for projects, such as payments in lieu of taxes). Many individuals emphasized the desire for projection taxation
to reflect the nature of equipment and structures, while allowing individuals and communities to rely on more
consistent tax rates over a longer period (as opposed to personal property tax rates, which depreciate in
assessed value annually).

Some community members mentioned that the voluntary production excise tax bill (Chapter 427, Laws of
2023) could address this issue and provide a local stimulus by exempting projects from the state portion of
personal property tax and redistributing it to the applicable county, school district(s), and tribe(s). Some focus
group attendees expressed concerns about the bill’s language, saying that it takes agency away from counties
for how to allocate funds.17 There was also confusion about what portion of personal property taxes can be
exempted; Washington Department of Revenue (DOR) confirmed it is solely the state portion.

An attendee at a public meeting suggested that the state could adopt a model established by Oregon that
“requires the utility to provide a stable tax benefit to the community.” The consultant team assumes this
attendee was referencing Oregon’s fee in lieu of property taxes for qualifying solar projects program, passed in
2015, in which solar projects pay an annual flat fee of at least $5,500 and up to $7,000 per MW instead of


17 “Supporting Clean Energy through Tax Changes That Increase Revenue to Local Governments, Schools, and Impacted Communities,”

Pub. L. No. House Bill 1756 (2023), https://lawfilesext.leg.wa.gov/biennium/2023-24/Pdf/Bills/Session%20Laws/House/1756-
S.SL.pdf?q=20240806153515.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       25
property taxes.18 The program expired on January 2, 2022. Oregon also has a Strategic Investment Program
that offers a tax exemption on a portion of large capital investments (including those by clean energy
developers) and requires businesses to pay a community service fee to the county instead.19

Clean energy jobs
As one community member said, “Jobs are number one.” One interviewee compared the experience of rural
communities with the timber economy, stating, “For years it was jobs versus environment, manufactured by
resource extraction companies. It was a trick – the timber industry left us with neither jobs nor the
environment.” The individual suggested avoiding this choice and instead illustrating that a clean energy
economy can benefit both people and the environment. Several community members emphasized the
potential for increased local employment during project construction and operation if developers and
communities could agree to require — or at minimum favor — hiring from the local labor pool.

Others spoke about the expectations of job creation for people in the region. They emphasized that people
would expect that if a clean energy project converted land that would otherwise be a source of employment
(primarily agricultural land), the number of jobs created for clean energy should at least equal the number of
jobs displaced.

One individual suggested that a way to support local jobs is to support trade school programs to help people
work in the clean energy industry. They also suggested that the state should encourage clean energy
manufacturing in rural areas (e.g., a solar panel fabrication plant) so there is local economic value.

Another community member suggested establishing a program where people can see a clear career path,
without need for previous experience or training, as part of the effort to combat climate change and establish a
clean energy economy.

Finally, during the public meeting in Zillah, the consultant team received feedback that many decisions are
made without farmworkers’ voices. Attendees suggested that it would be beneficial to talk to the farmworkers
about developing a clean energy labor force. They also suggested that organizations that have relationships
with the farmworker community should be a link between farmworkers and decision makers on clean energy
projects.


Economic analysis
Methodology
The consultant team analyzed the economic and financial impacts of utility-scale clean energy projects
developed and operated in rural communities in Washington since 2019. The analysis quantified the
distribution and magnitude of economic impacts of these activities to inform recommendations for how the
costs and benefits could be more equitably distributed to, among, and within rural communities.

This analysis examined:

    •    Direct, indirect, and induced jobs in construction and operations



18 “Relating to Taxation of Solar Projects; and Prescribing an Effective Date.,” Pub. L. No. HB 3492 (2015).
19 Business Oregon, “Strategic Investment Program,” n.d., https://www.oregon.gov/biz/programs/sip/pages/default.aspx.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                  26
    •   Financial returns to property owners
    •   Effects on local tax revenues and public services
    •   Effects on other rural land uses, such as agriculture, natural resource management and conservation,
        and tourism
    •   Geographic distribution of large energy projects previously sited or forecast
    •   Potential forms of economic development assistance and impact mitigation payments
    •   Relevant information from the 2023 Washington State University Least-Conflict Solar Siting project in
        the Columbia Basin area

The Rural Clean Energy Study details the evaluation of the economic and financial effects of siting large energy
projects in rural areas. This section provides information on methods and scope. The consultant team
undertook a case study approach and examined nine projects in depth, along with state-level data for
additional tasks where applicable. The case study approach was vetted with representative interests during
individual and group interviews prior to full implementation.

The study also provides recommendations for how policies, projects, and investment programs, including
energy facility siting through EFSEC, can be developed or amended to distribute costs and benefits more
equitably to rural communities.

Appendix A provides additional detail on data sources. Appendix B presents all of the individual case studies.

Analytical process
In Appendix A, Figure A2 provides a visual illustration of the general economic analysis process, and Table A4
provides a summary of the analysis, including key data sources and analytic steps. The analysis prioritized
developing quantified estimates, where feasible. When data limitations (as described in Table A14 in Appendix
A) prevented quantifying impacts, the analysis describes impacts qualitatively.

Temporal scope
The temporal scope of the economic and financial analysis is generally 2019 through 2029. Projects that are
currently operating, progressing towards operation, or planned to be developed within this range were
considered. The consultant team also included the Tucannon River Wind Farm, constructed in 2014, as a case
study project, because it was identified as a key example project by Commerce and collaborators.

Geographic scope
The geographic focus of the economic analysis was rural Washington. To define rurality, the consultant team
used the United States Department of Agriculture’s (USDA) 2010 Rural Commuting Area (RUCA) Codes and all
areas within the Columbia Plateau.20

Under the RUCA Codes, rural and urban areas are defined at the census tract level based on commuting
patterns of residents, specifically by the size and direction of the primary (largest) commuting flows.21 For
purposes of this analysis, rural areas are defined as census tracts with a RUCA code higher than 3 (i.e., any
non-metropolitan area). Based on RUCA data, approximately 13% of the population of Washington (or slightly
below one million people) reside in rural census tracts, and 66% of the land area in the state falls within these


20 United States Department of Agriculture (USDA), “Rural-Urban Commuting Area Codes,” July 2010, https://www.ers.usda.gov/data-

products/rural-urban-commuting-area-codes/.
21 The USDA also publishes Rural Urban Continuum Codes (RUCC). These are available at the county level and produce similar results

to the RUCA codes. However, the RUCA data is available for census tracts, which makes it more applicable for this analysis.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           27
rural census tracts. See Table A6 and Table A7 in Appendix A for the USDA RUCA codes and their
corresponding definitions as well as the breakdown of counties by code.

Energy project scope
This analysis is generally focused on utility-scale (greater than 1 megawatt (MW) of installed capacity) clean
energy projects constructed or proposed in Washington since 2019. The analysis considered a wide range of
clean energy technologies, including solar photovoltaic (PV), on- and off-shore wind, battery energy storage
system (BESS), biomass and biofuels, hydropower, and nuclear.22 However, a number of these technologies
(nuclear, hydropower, and offshore wind) have not had projects constructed since 2019 and thus no projects
using those technologies were evaluated in detail.

The consultant team identified clean energy projects using data from two primary sources, U.S. Energy
Information Administration (EIA) Form 860 and EFSEC project websites, supplemented by additional projects
identified from the Bonneville Power Administration (BPA) Interconnection Queue23 and Northwest Power and
Conservation Council Power Plant Database.24 In total, our review identified 20 study projects, including 10
operating and 10 planned or proposed projects. The consultant team then consulted with Commerce to select
a subset of nine projects for detailed assessment based on the criteria in Table 2.




22 The analysis does not include transmission infrastructure projects, regardless of size.
23 Review of the BPA Interconnection Queue yielded two operating projects: Juniper Canyon 2 Solar and Qualco Biofuel Project,

however, it is possible that this list includes additional planned projects not included in this analysis. For example, there were 117
existing interconnection requests associated with clean energy technologies submitted to the BPA between August 2018 and August
2024 with an aggregate capacity of almost 50,000 MW. Tables A8 and A9 in Appendix A summarize the total number of BPA
interconnection requests and total requested capacity by county and technology. However, while some submitted interconnection
requests identify the point of interconnection, capacity, and technology, the majority of requests do not include the project name, the
requesting utility and/or developer, project acreage, or geographic location beyond the project county. In addition, there also may be
duplicate requests associated with multiple interconnection requests that contain the exact same project information. With these
limitations in mind, the consultant team was able to identify two projects from the BPA Interconnection Queue (Juniper Canyon 2 Solar
and Qualco Biofuel Project) with a sufficient level of project-specific information to include in the list of 20 study projects.
24 NW Power and Conservation Council Power Plant Database, n.d., https://www.nwcouncil.org/energy/energy-topics/power-

supply/map-of-power-generation-in-the-northwest/


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               28
Table 2. Project inclusion criteria for detailed economic and financial analysis
Criteria                  Consideration and rationale

Geographic and
                          Projects must meet the geographic (rural areas) and temporal scope (2019-2029).
Temporal Scope

                          Projects without adequate data (e.g., potential project acreage) will not be feasible to consider the
Data Availability
                          potential economic and financial impacts.

Size                      Projects must be utility-scale and at least 1 MW or less than 1 MW with storage.

Geographic Distribution   Projects should represent a diverse and dispersed number of areas across the state.

Technological Diversity   Projects will represent a diverse set of technologies.

                          Projects will be sited in a rural area, or the Columbia Plateau. (Note: most projects in the inventory were
Rurality
                          screened for this prior to determining their inclusion in the analyses.)

Specific Major Projects   Projects identified by Commerce or other collaborators that are specifically highlighted for inclusion.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  29
Table 3 presents the list of 20 study projects, with the nine clean energy projects selected for detailed
economic and financial analysis bolded.

Table 3. Selected Projects for Detailed Economic and Financial Analysis
    Project                       Technology               Capacity                Status                  Year             County

    Arlington Microgrid           PV+BESS                  1.5 MW                  Operating               2019             Snohomish

    Badger Mountain Solar         PV+BESS                  400 MW                  Planned                 2025             Douglas

    Carriger Solar Project        PV+BESS                  160 MW                  Planned                 2025             Klickitat

    Columbia Solar                PV                       15 MW                   Operating               2022             Kittitas

    Desert Claim Wind Power
                                  Wind                     100 MW                  Planned                 2028             Kittitas
    Project

                                                                                   Under
    Goose Prairie Solar           PV                       80 MW                                           2024             Yakima
                                                                                   construction

    High Top Solar                PV                       80 MW                   Planned                 2025             Yakima

    Hop Hill Solar                PV+BESS                  1,000 MW                Planned                 2025             Benton

    Horn Rapids Solar, Storage
                                  PV+BESS                  4 MW                    Operating               2020             Benton
    and Training

    Horse Heaven Clean
                                  Wind, PV+BESS            975 - 1,150 MW          Planned                 2025             Benton
    Energy Center a

    Juniper Canyon 2 Solar        PV                       90 MW                   Operating               2020             Klickitat

    Lund Hill Solar               PV                       150 MW                  Operating               2022             Klickitat

    McKinley Paper Company –
                             Biomass                       13 MW                   Operating               2022             Clallam
    Washington Mill

    Ostrea Solar                  PV                       80 MW                   Planned                 2025             Yakima

    Qualco Project                Biofuel                  3 MW                    Operating               2021             Snohomish

    Rattlesnake Flat              Wind                     144 MW                  Operating               2020             Adams

    Saddle Mountain East Wind
                                  Wind                     126 MW                  Planned                 2025             Adams
    Farm

    Skookumchuck Wind
                                  Wind                     136 MW                  Operating               2020             Lewis
    Facility

    Tucannon River Wind Farm
    b                             Wind                     267 MW                  Operating               2014             Columbia

    Wautoma Solar                 PV+BESS                  940 MW                  Planned                 2025             Benton

a
  As of July 2024, the total capacity of the proposed Horse Heaven Clean Energy Center project was unclear. To reflect this uncertainty, the consultant
team performed its analysis for a range of proposed project sizes discussed between EFSEC and Washington state governmental officials.
b
  While the Tucannon River Wind Farm was constructed before 2019, the project was identified as a key example project by Commerce and collaborators
and is included as a case study project.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                              30
Findings: Geographic distribution of large energy
projects
Background
Rural communities affected by clean energy development in Washington raised concerns that projects are
disproportionately located in rural areas and that such projects may unfairly increase the economic burden
placed on residents of these communities without providing many local benefits. This section describes the
location of existing and planned clean energy projects in Washington and evaluates how these projects vary by
characteristics including technology, size, and acreage.

Project characteristics and geographies
As discussed in the previous section, the consultant team identified 20 projects developed since 2019,
including 10 operating and 10 planned or proposed projects. In this section, the consultant team examined the
geographic distribution of these 20 clean energy projects by mapping operating and planned projects based on
the criteria described in Table 2 (above). The consultant team catalogued project characteristics and used U.S.
Census American Community Survey (ACS) data to observe any differences in community characteristics
where projects are located. Recent utility-scale projects have generally been located east of the Cascades with
clusters in the south-central area. Figure 1 shows the location of the projects considered in this analysis. Only
the nine case study projects, which include both planned and operating projects, are labeled.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        31
Figure 1. Geographic distribution of operating (top) and planned (bottom) study
projects




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT            32
To date, wind projects have been more common in Washington than solar energy projects; however, recent
years have seen an increase in siting and development of solar energy projects. As shown in Table 4, the
majority of the study projects (12 of 20) are or will be sited in rural areas. Notably, most of the solar projects
include or plan to include battery storage as well. Batteries appear less common for wind projects. The
planned or proposed projects do not appear to be sited in distinctly different or new geographic areas
compared to existing operating projects. As shown in Table 5, four counties host projects with over 100 MW
already operating.

Table 4. Study project characteristics
                                            Number of
                             Number of                                                       Average
                                            Planned or     Total Number   Number of                     Average Gross
Technology                   Operating                                                       Capacity
                                            Proposed       of Projects    Rural Projects a              Acreage
                             Projects                                                        (MW)
                                            Projects

Solar Photovoltaic            3             3              6              3                  83         1,016

Solar Photovoltaic + BESS     2             4              6              4                  428        3,018




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                               33
                                                         Number of
                                      Number of                                                                     Average
                                                         Planned or         Total Number        Number of                             Average Gross
    Technology                        Operating                                                                     Capacity
                                                         Proposed           of Projects         Rural Projects a                      Acreage
                                      Projects                                                                      (MW)
                                                         Projects

    Onshore Wind Turbine               3                  2                 5                   4                    155              15,975

    Solar Photovoltaic + Onshore
                                       -                  1                 1                   --                   1,450            72,000
    Wind Turbine + BESS

    Other technology b                2                  0                  2                   1                   8                 --

    Total                             10                 10                 20                  12                  --                --

a
 As described above, rural is defined using USDA RUCA codes.
b
 The “Other” category includes one operating biomass project (McKinley Paper Company – Washington Mill) and one operating biofuel project (Qualco
Project).
Source: IEc analysis of projects identified in EIA Form 860 (Annual Electric Generator Report 2023, https://www.eia.gov/electricity/data/eia860/), EFSEC
project websites (https://www.efsec.wa.gov/energy-facilities) and other data sources including regional electrical planning documents (e.g., Bonneville
Power Administration Interconnection Queue, NW Council Power Plant Database).


Table 5. Utility scale projects by county (in-scope projects only)
                                                   Number of Planned
                           Number of                                         Total Number        Total MW Capacity         Total MW Capacity
    County                                         or Proposed
                           Operating Projects                                of Projects         (Operating)               (operating and planned)
                                                   Projects

    Adams                  1                       1                         2                   144                       270

    Benton                 1                       3                         4                   4                         3,400

    Clallam                1                       --                        1                   13                        13

    Columbia               1                       --                        1                   267                       267

    Douglas                --                      1                         1                   --                        400

    Kittitas               1                       1                         2                   15                        115

    Klickitat              2                       1                         3                   240                       463

    Lewis                  1                       --                        1                   136                       136

    Snohomish              2                       --                        2                   5                         5

    Yakima                 --                      3                         3                   --                        240

    Total                  10                      10                        20                  823                       5,302
a This table only includes counties in Washington with at least one clean energy project within the scope of the study; 29 counties have

zero.25
Sources: IEc analysis of projects identified in EIA Form 860 (Annual Electric Generator Report 2023,
https://www.eia.gov/electricity/data/eia860/), EFSEC project websites (https://www.efsec.wa.gov/energy-facilities) and other data
sources including regional electrical planning documents (e.g., Bonneville Power Administration Interconnection Queue, NW Council
Power Plant Database).


Community context
Table A10 in Appendix A compares the demographic characteristics of census tracts that intersect case study
projects, all in-scope projects (i.e., projects built or planned since 2019) and the state. Examined census tracts



25 Washington State Office of Financial Management, “County and City Data,” September 6, 2023, https://ofm.wa.gov/washington-data-

research/county-and-city-data.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                               34
had a slightly higher median income ($91,806) compared to the state median income ($90,325), along with a
lower percentage of the population below the poverty line (7.2% vs. the state’s 9.9%) and or unemployed (2.8
percent compared to the state’s 3.2 percent).

Residents of the census tracts containing projects had a different racial and age distribution than the rest of
the state. Of residents within project census tracts, 17.7% were over 65 years old (compared to the state at
16%) and only 21.1% of the population identified as other than white and non-Hispanic (vs. the state’s 34.5%).

The census tracts in the study area also exhibit higher percentages of the population with less than a high
school diploma or equivalent (9.9%) and without health insurance (12.0%) compared to the state (7.9% and
9.2%, respectively). The study area census tracts experienced more population growth from 2012 to 2022
(47.8%) relative to the state average (14.1%).

Finally, residents of the study census tracts were more likely to spend a greater percentage of their income on
energy costs; the population-weighted average energy burden for the study area census tracts was 2.2%, while
the state average is 1.5%.

Forecast of projects needed to meet clean energy goals
The consultant team relied on CETI’s deep decarbonization pathways study Net-Zero Northwest: Technical and
Economic Pathways to 2050 (NZNW), released June 2023,26 for a forecast of the potential requirement for
siting clean energy projects in rural areas of the state. The NZNW analysis uses a modeling approach
consistent with the Washington 2021 State Energy Strategy27 and incorporates more recent information on
costs and technologies. The consultant team also referenced technical potential and supply curve data from
the National Renewable Energy Laboratory (NREL)28 to examine solar and wind capacity by county.

Additional solar and wind capacity to meet growing electricity demand
The NZNW study modeled energy pathways to meet net-zero emissions by 2050 in Idaho, Montana, Oregon,
and Washington. The study incorporated state-specific policies, including Washington’s interim 2030
emissions target (45% reduction by 2030 from 1990 levels), and CETA for the state’s electricity sector
(greenhouse gas emissions neutral by 2030 and 100% clean by 2045).

The NZNW study — as with other deep decarbonization studies — found that using clean electricity to power as
many buildings, transportation, and industrial processes as possible is the most efficient and economical way
to decarbonize. This is because electricity is inherently more efficient than fossil fuels in many applications in
the economy, notably vehicle motors and heating in buildings.

New loads from electrification and fuels production would drive large investments in clean energy resources to
generate electricity. Table 6 below shows the NZNW results for electricity generation capacity in Washington
in 2021 (the study’s baseline year), 2030, and 2050. Figure 2 shows the generation graphically in 2021-2050.




26 Clean Energy Transition Institute, “Net-Zero Northwest: Technical and Economic Pathways to 2050 (NZNW),” June 2023,

https://www.nznw.org/.
27
   Washington State Department of Commerce, “Washington 2021 State Energy Strategy” (Washington State Department of Commerce,
2020), https://www.commerce.wa.gov/growing-the-economy/energy/2021-state-energy-strategy/.
28 “National Renewable Energy Laboratory (NREL),” n.d., https://www.nrel.gov/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                    35
Table 6. Electricity generation capacity (GW) in Washington on the path to net-zero
emissions
                                                                                                              Change 2021-
 Resource                                         2021                     2030                  2050
                                                                                                              2050

 Nuclear                                          1.2                      1.5                   1.1          0.0

 Hydro                                            21.3                     22.4                  22.4         1.1

 Gas                                              3.3                      3.0                   7.9          4.6

 Other                                            1.4                      0.1                   0.1          -1.3

 Grid-scale PV Solar                              0.0                      0.0                   10.4         10.4

 Distributed PV Solar                             0.4                      1.0                   4.9          4.4

 Onshore wind                                     3.4                      4.3                   10.4         7.1

 Storage                                          0.3                      0.3                   0.3          0.0

 Total                                            31.3                     32.6                  57.6         26.4

Source: Net-Zero Northwest: Technical and Economic Pathways to 2050, June 2023. https://www.nznw.org/energy


Figure 2. Electricity Capacity in Washington on the Path to Net-Zero Emissions




Source: Net-Zero Northwest: Technical and Economic Pathways to 2050, June 2023. https://www.nznw.org/energy

According to the NZNW study, Washington would need to build approximately 15 GW of solar (10.4 of grid-
scale and 4.4 of distributed), as well as 7 GW of onshore wind. For context, the NZNW study found that other
states in the Northwest would also build significant clean energy capacity, as seen in Table A11 and Table A12
in Appendix A. For example, Oregon would build approximately 15 GW of solar, and Idaho, Montana, and
Oregon would all build more wind generation capacity than Washington (11 GW, 55 GW, and 10 GW
respectively).




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                   36
Potential capacity, capacity factor, and levelized cost of energy (LCOE)
for solar and wind resources
The NZNW study identified the amount of wind and solar resources that would need to be developed in
Washington to meet the state’s climate and energy transition requirements at lowest cost, but the study did
not identify the level of development in specific locations or regions in the state. To provide a rough estimate
of development potential in individual areas, the study team referenced datasets from the National Renewable
Energy Laboratory (NREL) that characterize the quantity and quality of various energy resources to examine
the potential available capacity of distributed solar, utility-scale solar, and land-based wind capacity by county.

The analysis presented here does not attempt to predict or assign the specific locations where wind and solar
resources would be built to meet the NZNW amounts. Many factors would figure in those siting selections.

The figures in the section below present the following for solar and land-based wind:

    •    Potential capacity: Maximum amount of electricity (in MW) that could be generated.
    •    Average capacity factor: The ratio of actual energy output to the maximum theoretical energy output. A
         higher capacity factor means a higher quality clean energy resource (e.g., a stronger wind resource in a
         particular area).
    •    Levelized Cost of Energy (LCOE): A summary metric that combines technology cost with capital and
         operations expenditures, as well as capacity factor. LCOE is a way to measure the average cost of
         generating energy over the lifetime of a resource. In the following calculations, the consultant team
         excluded data for which the LCOE was above $100/MWh, as that cost would likely be prohibitive to
         development.

Additionally, the NREL datasets include two access levels that vary the land use restrictions for onshore wind
and utility-scale solar, as seen in Figures 4 through 7 below:

    •    Reference access: Applies a range of land area exclusions and is used by default in NREL's capacity
         expansion modeling.
    •    Limited access: Applies multiple additional exclusions of locations of geographic locations to reflect a
         more restrictive approach to siting clean energy facilities.29

Distributed solar
Figure 3 shows the potential capacity for distributed solar (i.e., rooftop solar), in megawatts (MW), in
Washington counties.30 In this map, residential and commercial rooftop solar are combined for approximately
12,500 MW of potential distributed solar capacity in the state. Since the potential capacity depends on the
number of available rooftops, there is higher capacity shown in more densely populated counties, such as King,
Pierce, and Snohomish counties.




29 Land Use and Turbine Technology Influences on Wind Potential in the United States,      Energy (2021), section 2.4,
https://doi.org/10.1016/j.energy.2021.120044
30 The consultant team calculated potential capacity for distributed solar based on two NREL datasets. Technical generation potential

data are from the State and Local Planning for Energy tool (https://maps.nrel.gov/slope), and capacity factors are taken from the NREL
Solar Supply Curve (reference access) at county-level averages (https://www.nrel.gov/gis/solar-supply-curves.html). One caveat for
this approach is that capacity factors for distributed solar photovoltaics are typically below factors for utility-scale photovoltaics. Thus,
the estimates of potential capacity for distributed solar may be underestimated.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    37
Figure 3. Distributed Solar Potential Capacity




Source: National Renewable Energy Laboratory. "Residential Rooftop PV" and “Commercial Rooftop PV,” State and Local Planning for
Energy, accessed 9/17/2024, https://maps.nrel.gov/slope.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                             38
Figures 4 and 5 show the potential capacity, average capacity factor, and LCOE for utility-scale solar in the
Reference and Limited Access levels. The Reference Access level finds nearly 817,000 MW of potential utility-
scale solar capacity in the state, while the Limited Access level finds approximately 308,000 MW. Both figures
highlight the higher-quality wind resources located in the eastern part of the state.

Figure 4. Utility scale solar potential capacity, capacity factor, and average LCOE:
Reference Access Level




Source: NREL (National Renewable Energy Laboratory). Solar Supply Curve. n.d., https://www.nrel.gov/gis/solar-supply-curves.html




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                             39
Figure 5. Utility scale solar potential capacity, capacity factor, and average LCOE:
Limited Access Level




Source: NREL (National Renewable Energy Laboratory). Solar Supply Curve. https://www.nrel.gov/gis/solar-supply-curves.html




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       40
Land-based wind
Figures 6 and 7 show the potential capacity, average capacity factor, and LCOE for land-based wind in the
Reference and Limited Access levels. The Reference Access level finds approximately 397,000 MW of
potential land-based wind capacity in the state, while the Limited Access level finds approximately 376,000
MW.

Figure 6. Land-based wind potential capacity, capacity factor, and average LCOE:
Reference access level




Source: NREL (National Renewable Energy Laboratory). Wind Supply Curve. n.d., https://www.nrel.gov/gis/wind-supply-curves.html




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           41
Figure 7. Land-based wind potential capacity, capacity factor, and average LCOE:
Limited Access Level




Source: NREL (National Renewable Energy Laboratory). Wind Supply Curve. https://www.nrel.gov/gis/wind-supply-curves.html




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                     42
Comparison of available and required capacity
Table 7 compares the amount of solar and wind capacity identified in the NZNW study to the technical
potential for each resource type. It shows that even with the Limited Access level of restrictions on renewable
energy siting, the total potential capacity for each energy resource is higher than the target capacity required
by 2050 in the NZNW study. The technical potential for distributed solar is almost three times the required
amount identified in the NZNW study, and in the Limited Access case, the technical potential for utility-scale
solar and land-based wind are each about 30 times the NZNW amount.

Table 7. Comparison of required solar and wind capacity from net-zero northwest
with potential capacity
                            NZNW Target Capacity (2050)             Reference Access: Total Potential       Limited Access: Total Potential
 Resource
                            [MW]                                    Capacity [MW]                           Capacity [MW]

 Distributed Solar          4,872                                   12,479                                  n/a31

 Utility-scale Solar        10,448                                  816,947                                 308,268

 Land-based Wind            10,442                                  396,720                                 375,840

Sources: Net-Zero Northwest: Technical and Economic Pathways to 2050, June 2023. https://www.nznw.org/energy; National Renewable Energy
Laboratory. "Residential Rooftop PV" and “Commercial Rooftop PV,” State and Local Planning for Energy, accessed 9/17/2024,
https://maps.nrel.gov/slope; NREL (National Renewable Energy Laboratory). Solar Supply Curve. https://www.nrel.gov/gis/solar-supply-curves.html;
NREL (National Renewable Energy Laboratory). Wind Supply Curve. https://www.nrel.gov/gis/wind-supply-curves.html


Summary of findings
The consultant team identified 10 large-scale clean energy projects developed since 2019 and 10 projects in
various planning stages, of which 90% (18 out of 20) are onshore wind or solar projects that are sited or
planned to be sited in rural parts of the state. Recent clean energy development is typically located east of the
Cascades with additional projects in south-central Washington. There are three rural counties that hosted
recently constructed projects with over 100 MW of existing capacity. Proposed future capacity projects are in
generally similar areas as currently operating projects.

Altogether, the economic analysis indicates that the populations of interest are not significantly different from
the average state population in most ways. The more dissimilar statistics (e.g., percent of the population
identifying as white and non-Hispanic, percent of the population with less than a high school diploma or
equivalent) are generally reflective of the rural nature of most of the examined census tracts and are in line
with other studies that have examined clean energy development across the country between urban and rural
communities.32

However, the fact that these statistics are expected in rural areas does not detract from the social vulnerability
they may signal; populations with less health insurance coverage, more aging populations, or higher energy
burden may experience increased social vulnerability compared to communities without these characteristics.




31 Rooftop solar would be installed on existing structures and therefore is not impacted by land area exclusions in the NREL Limited

Access case.
32 Kim Parker et al., “What Unites and Divides Urban, Suburban and Rural Communities,” May 22, 2018,

https://www.pewresearch.org/wp-content/uploads/sites/20/2018/05/Pew-Research-Center-Community-Type-Full-Report-FINAL.pdf.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             43
In addition to examining recently developed and planned projects, the consultant team referenced the NZNW
deep decarbonization pathways study, along with technical potential and supply curve data to forecast the
potential requirement for siting clean energy projects in rural areas of the state.33 The NZNW study found that
by 2050 Washington would need to build approximately 15 GW of solar (10.4 of utility-scale and 4.4 of
distributed renewable energy) and 7 GW of onshore wind to achieve net-zero emissions in the Northwest.
There are many factors that dictate where within the state these resources would be located, and maps
presented in this section illuminate the relative capacity in each county for distributed solar, utility-scale solar,
and land-based wind.




33 “National Renewable Energy Laboratory (NREL).”




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                              44
Findings: Land use
Background
Some community members and other representative interests expressed concerns that clean energy projects
may adversely affect local communities, both in terms of losses to productive lands for agriculture, as well as
reductions in the attractiveness of the area to tourism, recreation, or other development activities. This section
evaluates the impacts of clean energy development on land uses within the project lease areas for case study
projects and discusses the likelihood of other effects on nearby land uses.

Changes in land use
Examining how land use has changed inside and outside leased areas for utility-scale clean energy projects
can illuminate financial impacts on individuals, economic impacts on regional economic activity, and changes
to an area’s aesthetic appeal and character. The consultant team analyzed satellite imagery and USDA crop
data to assess land use in project lease areas before and after development of utility-scale clean energy case
study projects. This evaluation identified differences across projects, as well as important differences between
impacts on land use within project lease areas for utility-scale wind versus solar energy projects.

Prior land uses
Prior to construction, case study project lease areas showed a variety of land uses, including crops, forest,
pasture, and development. Half of the six operating case study projects – Rattlesnake Flat, Tucannon River
Wind Farm, and Columbia Solar – are located on land that was primarily used for agriculture before
construction. Of the 38,629 crop acres within the combined project lease areas across these three projects,
USDA data suggests that 62.5% were active cropland producing winter wheat, spring wheat, peas, and small
quantities of other crops.34,35

The land currently occupied by Tucannon River Wind Farm, while primarily used for agriculture, was open to
public access for hunting, birdwatching, and other recreational activities, but with special rules and permits in
place to ensure the safety of visitors.36,37

The land occupied by the Skookumchuck Wind Facility was used primarily for timber production. It is sited in a
forest resource zone owned by Weyerhaeuser Timber, which farmed and harvested the area for lumber. These
forested areas also provided recreational value through permits for non-motorized use.38




34 United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS), “2022-2023 Cropland Data

Layer,” January 31, 2024, https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
35 2016 Land Cover, National Land Cover Database (NLCD), Multi-Resolution Land Characteristics (MRLC) Consortium. Accessed on

May 23, 2023 at https://www.mrlc.gov/.
36 “Register to Visit Tucannon,” Portland General Electric. Accessed on April 24, 2024 at https://portlandgeneral.com/hunting-at-

tucannon/register-to-visit-tucannon.
37 “Access rules: Tucannon River Wind Farm, Hopkins Ridge Wind Facility & Marengo Wind Facility,” Portland General Electric. Accessed

on April 24, 2024.
38 “Vail Permit Area Details,” Weyerhaeuser. Accessed on April 24, 2024 at

https://recreation.weyerhaeuser.com/Permits/Search/c15e15be-08df-4621-a09a-9abb827a8869.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            45
Some projects, such as Lund Hill Solar39 and Horn Rapids Solar, Storage, and Training, were sited on land that
was considered unattractive for agriculture, forestry, and recreational uses, which helped avoid significant
impacts to economically productive activities.

Post-construction impacts on land use
Once constructed, the studied wind and solar projects had very different levels of impact on land use within the
project lease area with different changes in measured “developed” land (as shown in Table 8).

The case study analyses suggest that utility-scale wind energy development projects in Washington have had a
relatively small footprint on surface lands, typically requiring usage of 2-4% of the total project area for project
operations, with the remainder retaining its original land use.

Specifically, the study found that the infrastructure for the utility-scale wind projects in the study occupied
between 390 and 480 acres, out of total project acreages that ranged from 10,000 to 25,000 acres. All three
projects had relatively low percentages of previously developed land within the project footprint (1.4%, 0.6%,
and 4.5%, respectively). Following construction, project infrastructure only occupied an additional 108 acres
across all project footprint areas combined.

Land use changes pre- and post-construction were small given the small footprint of wind projects. Both wind
projects sited on agricultural land experienced minimal reductions in harvested crop acreage. Skookumchuck
Wind Facility, which is located on forested land, continues to allow timber harvest. Recreational activities
within the project areas continue, with special rules and permits in place to ensure the safety of visitors and
the projects themselves.40,41

In the case study analysis, solar projects required more land be developed than wind projects. Due to the
density of required infrastructure and the need to establish a fence line surrounding solar project operations,
the solar energy projects required conversion of most preexisting land uses within the fence line for
development. While developers tout that the area under solar panels can be used for agriculture, residents
often found this unrealistic due to the cramped space under raised panels.42

Solar projects are also occasionally accompanied by storage facilities. Although battery storage is typically
located outside of the immediate project fence line, it is incompatible with other land uses and also requires
converting to developed land. Across the case study projects, the consultant team found this to hold true. As
shown in Table 8, 100% of the land within the footprint of solar energy case study projects (generally defined
as the area within the fence line) was reclassified as “developed” after construction. Land use outside of the
fence line but within the project lease area was unaffected.

In contrast with wind projects, most solar projects in the case studies were sited on land that was previously
pastureland, barren, or already developed. As such, preclusion of use of these lands has not resulted in




39 Recent information shows that as of Spring 2024, Lund Hill Solar is hosting a pilot project to graze sheep at the solar farm. See: Kelly

Pickerel, “Avangrid Hires 5,000 Sheep for Grazing on Two Solar Projects in the Pacific Northwest,” Solar Power World, n.d.]
40 Portland General Electric, “Register to Visit Tucannon,” accessed April 24, 2024, https://portlandgeneral.com/hunting-at-

tucannon/register-to-visit-tucannon.
41
   “Access rules: Tucannon River Wind Farm, Hopkins Ridge Wind Facility & Marengo Wind Facility,” Portland General Electric. Accessed
on April 24, 2024.
42 Personal communication with Kittitas and Klickitat Counties.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                   46
substantial lost income to landowners for these projects. However, some planned developments are sited on
currently active farmland, where lost farm profit for landowners could occur.

Table 8. Developed land acres within the project footprint43 before and after project
construction
                                                     Pre-project (Acres,            Post-project (Acres,
 Project                          Project type                                                                     Change (Acres, percent)
                                                     percent of total)              percent of total)

 Columbia                         Solar              0.5 (0.5%)                     99.5 (100%)                    +99 (+19,494%)

 Horn Rapids                      Solar              73 (100%)                      73 (100%)                      --

 Lund Hill                        Solar              3 (0.0%)                       1,618 (100%)                   +1,615 (+55,905%)

 Tucannon River                   Wind               226 (1.4%)                     251 (1.6%)                     +26 (+11%)

 Skookumchuck                     Wind               339 (4.5%)                     341 (4.5%)                     +2 (+0.7%)

 Rattlesnake Flat                 Wind               56 (0.6%)                      135 (1.5%)                     +80 (143%)

 Total                            --                 696 (2.0%)                     2,518 (7.3%)                   +1,822 (262%)

Source: USDA NASS Cropland Data (2019, 2022, 2023) and National Land Cover Database (2011, 2016, 2021). Totals may not sum due to rounding.

Figure 8 highlights the difference between land use conversion in wind vs. solar projects. Wind projects in the
case studies resulted in between two to 80 acres of leased land reclassified by USDA as “developed” after
construction. Across all three wind projects, this means that developed land went from making up 1.7% of the
project area to 2.2%, which is an average relative increase of 26%. Overall, the percentage of lands classified
as developed in our wind projects remained low after construction, at 2.2%.

In contrast, solar projects resulted in between 0.5 to 73 acres being reclassified as developed after
construction. While the acreage change is similar, these make up a much larger percentage of the total land
area for each solar project: across all three solar projects, developed land went from occupying 2.5% of the
project area to 69.2%, a relative increase of over 2,700%.

Most other land use classifications change minimally from pre- to post-construction, with forest,
grass/pastureland, and cropland decreasing by 27%, 22%, and less than one percent, respectively. Changes in
land use within solar project areas tell a different story. While the small amount of preexisting cropland within
the case study solar project areas only decreased by 29%, grass/pastureland decreased by 57%, while “other”
land (which includes scrubland, wetlands, and other natural land covers) decreased in coverage by 84%.

While these results are limited to the case study projects, discussions with county officials implied this trend is
generally consistent across previously sited projects (i.e., agriculture continues around wind turbines, while
fences and panels limit activities at solar projects).




43
  The consultant team choses to present the data focusing on changes within the project footprint because this area underwent more
significant transformations due to the higher concentration of project infrastructure, unlike the greater project lease area where
changes were less substantial and the infrastructure less dense.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                        47
Figure 8. Land use changes for solar (left) and wind (right) case study projects




Source: USDA NASS Cropland Data (2019, 2022, 2023) and National Land Cover Database (2011, 2016, 2021).


Land use values
As described above, agricultural land use experienced different degrees of change pre- and post-project, which
varied between wind and solar case studies.

Estimated values and revenues also varied depending on the crops and land usage. At average 2023 crop
values from the USDA, the value of the crops in the total project lease area for the three projects that had
active agriculture prior to development (Rattlesnake Flat, Tucannon, and Columbia Solar) were approximately
$10.3 million annually, or an average of $270 per acre in revenues.44,45

Net farm income would be a fraction of these total revenues. USDA data suggests that net income for
Washington farms over the past five years was approximately 24% of gross receipts, which would equate to




44 United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS), “2023 Washington State

Agriculture Overview,” 2023, https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.
45 Other case study project that had pasture and rangeland (Lund Hill) as well as silviculture (Skookumchuck) are not included here.

This analysis focuses on crop acreage and values.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                 48
net farm income of approximately $64 per acre at current crop prices for the three agricultural case studies.46
For some of these project areas, there are idle or fallow areas of cropland. Excluding these idle or fallow acres,
the revenues rise to approximately $430 per acre or net income of $100 per acre.

The combined area lost for these three projects was estimated at 146 acres. The loss of 146 crop acres equals
approximately $39,000 to $62,000 lost in crop revenue, or approximately $9,000 to $15,000 in net income.47,48
These estimated values for revenue per acre are relatively low compared to other agricultural production
values observed in Washington, particularly fruit and other products where revenues can be over $10,000 per
acre.

Planned projects are similar to existing projects in terms of their land use. For all three planned projects, most
of the project lease area is currently used for agricultural purposes. About 1.8% to 3.4% of the land is currently
developed, and the rest is occupied by grass or shrubland. Within the Carriger Solar and Horse Heaven project
sites, about three-quarters of the project area is currently used for crop production, with winter wheat, spring
wheat, alfalfa, and barley the most common crops grown in the area.

At average 2023 crop values, the Carriger and Horse Heaven project areas are predicted to produce $1.3
million and $10.1 million worth of crops per year, respectively. Although less than 1% of the Desert Claim
acreage is used for crop production, a large part of the project area is likely pasture. Using information from
the Final Environmental Impact Statement (EIS)49 for the Desert Claim Wind Power Project and analysis of
satellite imagery, the consultant team estimates this pasture area to be approximately 4,064 acres, which
suggests an annual revenue to landowners of $36,579 in addition to the approximate $9,000 annual profit from
crop revenues.

Although these projects are not yet constructed, the consultant team estimates the percentage loss of land for
each project based on trends for similar projects as described above. For wind projects, approximately 2% of
the total project area is converted to project operations, while the other 98% retains its original use. For solar
projects, conventional solar photovoltaic projects typically preclude other uses, resulting in a 100% loss of land
within the project footprint.

Based on these trends, the consultant team expects that the land within the footprint of the Carriger Solar and
the solar portion of the Horse Heaven project will be converted to project-only use. As a wind farm, Desert
Claim is only expected to lose about 2% of its land to project-only use. These estimates provide a sense of the
general scale of changes in land use after these projects are installed, but projects may change significantly
throughout the permitting, design, and approval process.

Summary of findings
Some community members provided input that clean energy projects may adversely affect local land use,
including agriculture productivity losses and detrimental effects to tourism and recreation activity. After



46 USDA Economic Research Service (ERS), “Net Cash Income: 2015-2022, Washington State,” February 7, 2024,

https://data.ers.usda.gov/reports.aspx?ID=17831#Pa87321020af842b28220448e5be6d60f_2_105iT0R0x47.
47 United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS), “2019 Cropland Data Layer,”

January 31, 2024, https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
48 Multi-Resolution Land Characteristics (MRLC) Consortium, “2011 Land Cover, National Land Cover Database (NLCD,” accessed May

23, 2023, https://www.mrlc.gov/.
49 Kittitas County, “Desert Claim Wind Power Project: Final Environmental Impact Statement,” n.d.,

https://www.efsec.wa.gov/sites/default/files/180105/00133/20040816_FEIS.pdf.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          49
reviewing six operating projects (three wind and three solar) as case studies, the consultant team found that
while wind projects tend to have minimal impacts to the land within the project lease area, solar projects
typically replace previous land use within the project footprint.

Based on satellite imagery and discussions with county officials, the consultant team determined that solar
panels and associated facilities (e.g., battery storage) are typically inside fence lines such that preexisting land
uses are no longer viable once the clean energy installation is in place. The case studies revealed that solar
energy projects convert the majority (if not all) of preexisting land use to solar development with a lease area
and the project fence line. These changes in land use are contained to the project footprint; outside of the
footprint within the lease area, land use continues as it did before project construction. There may be potential
for agricultural land use using agrivoltaics, but the consultant team did not find specific examples alongside
current utility-scale projects.

Notably, wind projects were sited on agriculturally or commercially profitable land more often than solar
projects, thus leading to reduced potential for adverse financial impacts to landowners. However, several
planned solar projects are intended to occupy land currently used for agriculture, which will prevent crop
harvest within the project footprint. Wind projects have a distinctly different impact on land use.

Projects with onshore wind convert approximately 2% of the total project area to project operations, with the
remainder retaining its original land use. Onshore wind projects sited in primarily agricultural land experience
negligible changes pre- and post- construction in harvested crop acreage within the project area given the
relatively small footprint. One onshore wind project sited in forestland also allows for uninterrupted
recreational use while experiencing negligible reductions in timber harvests.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                             50
Findings: Financial returns to property owners
Background
Community members and lawmakers inquired whether and to what extent leasing lands for renewable energy
projects is beneficial or harmful to landowners. Primary concerns include both the short- and long-term
community impacts, as well as whether adjacent landowners could be affected by these projects. Answering
this question is challenging due to the confidential nature of the agreements made between landowners and
project developers and further complicated by the variety of characteristics that affect neighboring property
values. This section evaluates what the consultant team could determine about the effects of rural clean
energy development on landowners within the project area.

Net financial impacts of leasing for energy projects
When a developer negotiates for land to develop a project, lease agreements with landowners can provide a
variety of financial incentives:

   •   Regular annual rent payments: Often different amounts during pre-development, construction, and
       operation phases paid either on a per acre basis or per MW installed. Some wind projects set per
       turbine lease rates and some agreements are based on a percentage of revenue. The consultant team
       found some agreements that provided a combination of these payments (e.g., a small amount per acre
       plus a per MW fee).
   •   Access payments: For example, for an access road or transmission line. Typically paid based on
       distance (e.g., by foot).
   •   Bonus payments: For example, a one-time bonus when the lease is signed.

Per-acre leases are more typical for solar projects, while per MW is common for wind projects. Based on
publicly available information, typical solar land lease rates range from a few hundred dollars per acre (e.g.,
$200 to $350 per acre) to as high as $1,000 per acre. These lease terms can vary significantly; on lower value
federal lands, the Bureau of Land Management (BLM) has lease rates as low as $30 per acre while for higher
values areas they can be as high as $3,000 per acre.

Wind lease agreements based on a per MW rate are typically thousands of dollars per MW. Table 9 shows the
range in leasing rates for wind and solar projects. These rates can vary dramatically by project but will
generally result in positive financial impacts for most landowners compared to agriculture, which is the most
common type of land used for clean energy development. For wind leases, where only 1%-3% of land is taken
up by turbines and infrastructure, there would be even larger financial returns as existing land uses can often
continue.

Across the nine case studies, agriculture was the most common pre-project land use, followed by timberland
and pastureland. To illustrate the potential financial impacts to landowners, the consultant team gathered
publicly available information on land values by type of economic activity, which the consultant team then
compared against estimated clean energy lease payments. To quantify the potential financial impact to
agricultural landowners, the consultant team relied on Geographic Information System (GIS) data to identify




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        51
the crop type that existed within the project footprint prior to development combined with data from the USDA
data to develop a per-acre estimate of pre-project agricultural revenues.50

For wheat (the most common crop grown in agricultural areas of project sites prior to development), the
statewide average revenue per acre is at the low end of leasing rates. Per acre, in the past five years, wheat
has averaged production revenues of $250 to $410 per acre ($61 to $100 in net income) while hay had average
revenues of $200 to $330 per acre ($8 to $79 in net income).51 This net income per acre is a relatively low
value compared to available leasing data. These values are general averages and do not represent actual
specific activities at a certain project site. The consultant team heard concern during interviews and outreach
that the crop values may be low or not capture the year-to-year market variations landowners experience.

Most crops grown in the state are slightly higher than this value, but also close to low-end leasing rates when
considering net income (i.e., after accounting for the costs of production). The exceptions are fruits such as
apples, cherries, and pears, as well as potatoes, which are nearly or above to $1,000 per acre or higher in net
income. These crop types appeared in limited quantities (i.e., less than 5%) in the case study analyses. This is
the higher end of leasing rates and would require significant payments to be financially responsible for a
property owner. In Table 9 below, only a few of the publicly reported lease rates would equal or greater than
these high value crops.

Overall, clean energy lease payments have the potential to generate a significant amount of revenue for
landowners. For example, for Rattlesnake Flat, annual lease payments for the entire lease area are estimated
at between $530,000 to $740,000 annually. After accounting for estimated lost crop income from primarily
wheat of up to $44,000, landowners as a group would gain up to $690,000 annually.

Prior to development, the Lund Hill Solar project footprint was pastureland that had historically low land rents
between $8 and $9 per acre over the past five years. As a result, the Lund Hill Solar Project likely resulted in a
substantial revenue boost to landowners, potentially increasing landowner income by up to $470,000 annually
in the first 10 years.

The total lease value of the Columbia Solar Project based on publicly available estimates would range from
$20,000 to $100,000 for 100 acres, not including signing bonuses and pre-development payments. This project
had slightly higher estimated crop values with most of the crop area being dry beans and alfalfa (slightly higher
than hay and wheat at $100 and $320 in net income, respectively). At the low end of the leasing range, the
project would barely break even (lease payments would be approximately $5,000 higher). Nevertheless, these
projects have the potential to result in positive financial returns to local landowners, which can also contribute
positively to local economies.




50 Specific crop values for case study projects are discussed in the Land Use section above. These projects might not be representative

of all potential lease areas for planned future projects.
51 United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS), “2023 Washington State

Agriculture Overview.”


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              52
Table 9. Publicly available annual lease rate data sources and literature
Source                       Year Scope of Analysis       Pre-development    Construction           Operations

Wind                         --     --                    --                 --                     --

Rattlesnake Flat WA DNR                                                      $4,000/installed MW    5-7% of gross quarterly
                             2019 Adams County, WA        $7,500 + $5,000
Lease                                                                        capacity               revenues

                                                                                                    $3,000 to $4,000/MW or 2-
Industry                     2016 N/A                     --                 --
                                                                                                    4% of revenues

American Wind Energy
                             2019 Western US              $7,841/MW          --                     --
Association

USDA Forum                   2023 United States           $10,000/turbine    --                     --

                                                                                                    $45/acre rented for 30
                                                                                                    years + $6,000/installed
                                                                                                    MW capacity $1/linear foot
                                                          $10/acre (+$1/year
                                                                             Assumed same as        of access road + $2/linear
In-state Wind Developer      2024 Lincoln County, WA      in year 4 of pre-
                                                                             Operations             foot of transmission
                                                          development)
                                                                                                    line/year (increases by 2%
                                                                                                    after 2nd anniversary of
                                                                                                    construction start)

Solar                        --     --                    --                 --                     --

                                                                             Increasing $1,000/year
                                                                                                    Years 1-10: $300/acre
                                                                             after 2nd year of pre-
Lund Hill WA DNR Lease       2019 Klickitat County, WA    $50,000 + $5,000                          Years 11-20: $350/acre
                                                                             development +
                                                                                                    Years 21-40: $400/acre
                                                                             construction

                                  Higher land value
BLM Solar Lease Rates52
                             2023 counties (e.g. King,    --                 --                     $1,013 - $3,112/acre
(2017-2025)
                                  Snohomish)

                                  Moderate land value
BLM Solar Lease Rates
                             2023 counties (e.g. Walla    --                 --                     $146 – $410/acre
(2017-2025)
                                  Walla, Lewis)

                                  Lower land value
BLM Solar Lease Rates             counties (e.g.
                             2023                         --                 --                     $36 – $106/acre
(2017-2025)                       Klickitat, Douglas,
                                  Ferry)

                                    Michigan, Texas,
Moore et al.                 2022                         --                 --                     $500 - $1,200/acre
                                    Maine

                                                                                                    $300 - $2,000/acre,
Strategic Solar Group        2018 United States           --                 --                     depending on location and
                                                                                                    project size


Property values
During public meetings and interviews, members of the public expressed concerns about potential impacts of
clean energy project development on neighboring property values. To determine whether any effects are
observable from the case study projects, the consultant team reviewed the assessed values of nearby parcels




52 https://www.blm.gov/sites/blm.gov/files/policies/IM2021-005_att5.pdf




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        53
in and outside of project footprints for three years prior and three years after project development, or until
present day.

As shown in Table 10, average parcel values for most projects did not change more than 6% from pre- to post-
project assessments, regardless of property location and project type. However, there were a few exceptions
to this finding. Lund Hill property values increased after project construction by 64% within the project footprint
and 30% in the project lease area outside footprint.

Skookumchuck property values within the footprint increased by 284% after project construction. The
consultant team did not find decreases in assessed property value larger than 2.5%.53 Table 10 also shows
how much the project parcels varied in value with standard deviations above $100,000 for many projects and
the combined case study parcels overall.

Table 10. Changes in average assessed parcel property values, pre- and post-project
                                                                                                                Parcel Value:
                                                    Parcel Value:                          Parcel Value:        Project Lease
                                                                          Within
                                Parcel Value:       Footprint Post-                        Project Lease        Area Outside      Outside
 Project Name                                                             Footprint
                                Footprint Pre-      Project*                               Area Outside         Footprint Post-   Footprint
 (# of Parcels)                                                           Percent
                                Project*            (standard                              Footprint Pre-       Project*          Percent Change
                                                                          Change
                                                    deviation)                             Project*             (standard
                                                                                                                deviation)

                                                    $138,024                                                    $461,702
 Columbia (14)                  $130,441                                  5.8%             $466,951                               -1.1%
                                                    (± $109,250)                                                (± $511,116)

                                                    $319,497                                                    $86,258
 Skookumchuck (27)              $83,255                                   283.8%           $87,540                                -1.5%
                                                    (± $223,624)                                                (± $32,737)

                                                    $123,451                                                    $46,516
 Tucannon (111)                 $126,643                                  -2.5%            $47,308                                -1.7%
                                                    (± $109,632)                                                (± $67,898)

                                                    $82,357                                                     $82,002
 Lund Hill (12)                 $50,289                                   63.8%            $63,114                                29.9%
                                                    (± $55,466)                                                 (± $80,420)

                                                    $138,705                                                    $173,685
 Rattlesnake Flat (99)          $142,245                                  -2.5%            $165,052                               5.2%
                                                    (± $97,855)                                                 (± $142,903)

 Overall Case Study                                 $160,407                                                    $170,033
                                $106,575                                  50.5%            $165,993                               2.4%
 Average                                            (± $119,165)                                                (± $167,015)

*Pre- and post-project values represent 3 years before and after the project construction year, respectively.


Property value literature review summary
Table A13 in Appendix A summarizes literature the consultant team identified and reviewed on the impact of
clean energy projects on property values. Studies in the western U.S. have identified public concerns that
property values will be affected by the “loss of rural character” caused by the presence of large-scale clean




53 Parcels within the Tucannon project footprint, see Table 10.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                         54
energy projects.54,55 Regarding the observed impacts of clean energy projects on property values, several
studies have found no significant impact on surrounding property values in rural or urban areas.56,57 ,58 ,59

Other studies suggest that properties with significant project-induced visual impairments could experience
adverse impacts on property values of 0.8% to 3.6% associated with large solar energy project developments,
or range from zero to 5.2% for wind developments.60,61 Notably, most sources describing the impacts of clean
energy development in rural areas are specific to New England, which may limit their applicability to rural
Washington.

Some research also supports the existence of “anticipation stigma,” where the uncertainty associated with
installation can cause property values to decline in anticipation of a new wind farm in the area.62 Regardless,
the negative impacts of project installation are typically limited to an approximate one-mile radius surrounding
the farm;63 beyond this, both visual and property value effects are not significant.

Summary of findings
Landowners have several factors to consider when deciding whether to lease land for clean energy
development. The key decision for property owners includes whether received lease payments outweigh the
potential revenues from existing land uses.

Lease payments can take many forms and may vary in magnitude by project phase. However, once projects
are in operation, lease payments are often distributed on a per-acre or per-MW basis (or both) and are typically
in the thousands of dollars annually for a single landowner. The size of payments will vary for each landowner
depending on the size of their lease or how many turbines (i.e., MW) they have on their land.

Based on the analysis, these lease payments are relatively lucrative for landowners. Lease payments typically
exceed the revenue per acre values associated with common Washington crops after consideration of the
associated costs of production. For wind energy leases, only 1%-3% of land is occupied by infrastructure, so
there may be even larger financial returns if a significant amount of agricultural land remains productive.




54 Shawn K. Olson-Hazboun, Richard S. Krannich, and Peter G. Robertson, “Public Views on Renewable Energy in the Rocky Mountain

Region of the United States: Distinct Attitudes, Exposure, and Other Key Predictors of Wind Energy,” Energy Research & Social Science
21 (November 2016): 167–79, https://doi.org/10.1016/j.erss.2016.07.002.
55 Brent S. Steel et al., “Environmental Value Considerations in Public Attitudes About Alternative Energy Development in Oregon and

Washington,” Environmental Management 55, no. 3 (March 2015): 634–45, https://doi.org/10.1007/s00267-014-0419-3.
56 Steven Laposa and Andrew Mueller, “Wind Farm Announcements and Rural Home Prices: Maxwell Ranch and Rural Northern

Colorado,” Journal of Sustainable Real Estate 2, no. 1 (January 1, 2010): 383–402, https://doi.org/10.1080/10835547.2010.12091798.
57 Ben Hoen et al., “Spatial Hedonic Analysis of the Effects of US Wind Energy Facilities on Surrounding Property Values,” The Journal of

Real Estate Finance and Economics 51, no. 1 (July 2014): 22–51, https://doi.org/10.1007/s11146-014-9477-9.
58 Gabriel S. Sampson, Edward D. Perry, and Mykel R. Taylor, “The On-Farm and Near-Farm Effects of Wind Turbines on Agricultural

Land Values,” Journal of Agriculture and Resource Economics 45, no. 3 (2020): 410–27, https://doi.org/10.22004/AG.ECON.302463.
59 Stephen Grover, “The Economic Impacts of a Proposed Wind Power Plant in Kittitas County, Washington State, USA,” Wind

Engineering 26, no. 5 (September 2002): 315–28, https://doi.org/10.1260/030952402321160615.
60 Vasundhara Gaur and Corey Lang, “House of the Rising Sun: The Effect of Utility-Scale Solar Arrays on Housing Prices,” Energy

Economics 122 (June 2023): 106699, https://doi.org/10.1016/j.eneco.2023.106699.
61 Salma Elmallah et al., “Shedding Light on Large-Scale Solar Impacts: An Analysis of Property Values and Proximity to Photovoltaics

across Six U.S. States,” Energy Policy 175 (April 2023): 113425, https://doi.org/10.1016/j.enpol.2023.113425.
62 Jennifer Hilnman, “Wind Farm Proximity and Property Values: A Pooled Hedonic Regression Analysis of Property Values in Central

Illinois,” (Illinois State University, Department of Economics, May 2010), https://www.livingstoncounty-il.org/wordpress/wp-
content/uploads/2014/11/PR-Ex.-32-2010-Wind-Farm-Proximity-and-Property-Values-Central-Illinois.pdf.
63 Elmallah et al., “Shedding Light on Large-Scale Solar Impacts.”




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                55
Many individuals expressed concerns about how the presence of clean energy development affects
neighboring property values. The consultant team also found that with a few exceptions, assessed property
values generally do not change more than 5% between pre- and post- construction averages, regardless of
property location and project type.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                      56
Findings: Tax revenues and public services
Background
Projects bring tax revenues to counties. Increases to county taxes come from three sources: real property,
personal property, and sales tax, with the majority coming from personal property and the one-time sales tax
increase during construction operations. However, there have been questions raised about whether the
impacts are sustained over time and how the changes to tax payments over time affect the counties in which
they are located, particularly as projects depreciate. In this section, the consultant team evaluates the impact
on tax collections from renewable energy project development, evaluates taxes from recent projects, and
analyzes the impact on county finances over time. This section also summarizes discussions and interviews
with several county officials.


Overview
Clean energy projects pay three forms of tax to state and local jurisdictions: real property tax, personal
property tax, and sales tax. Real and personal property are annual payments made by landowners and the
project owner, respectively. Sales taxes are paid on all purchases related to a project; these payments occur
primarily during project construction, and then periodically thereafter whenever equipment is replaced. Of
these three forms of taxes, personal property accounts for the largest portion of tax payments, followed by
sales tax and then real property. The consultant team discusses each form of tax payment in more detail.


Property taxes
Real property
Real property tax is the payment of taxes on land, structures, and other improvements on a site. Counties and
states tax these properties based on an assessment of fair market value. Importantly, solar panels and wind
turbines are treated as personal property and therefore are excluded from real property valuation. For the case
study projects, real property tax revenues are relatively small compared to the corresponding personal property
tax revenues for each project, given the undeveloped or agricultural nature of the land where these projects are
developed. Real property tax revenues in the first year of operation for the case study projects range from
$5,600 up to $67,000; on average, the ratio of first year real to personal property tax revenues is 0.027. Parcels
with buildings or other facilities would have higher real property taxes.

One aspect of real property taxes that affects certain projects is Current Use Status64 for agricultural, open
space, or timber land. Landowners apply for this status to the county authority where the land is located. Under
Current Use, land is taxed more favorably for as long as it remains in this status. When projects are developed,
depending on how much of the parcel is developed, the parcel might lose this status and require the landowner
to pay seven years of back taxes based on the difference between the Current Use valuation and the valuation
without that designation (fair market value).

This change results in a one-time bump in real property taxes when those back taxes are paid, as well as
higher real property taxes moving forward. For the solar case studies, Lund Hill Solar and Columbia Solar,
Current Use Status was removed from the associated parcels once the project was developed. Although the



64 Department of Revenue Washington State, “Current Use: Open Space Taxation,” Property Tax Resource Center, n.d.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                              57
landowners were the listed taxpayers, the consultant team expects that the project developer would pay the
taxes associated with the removal of Current Use Status and the tax benefits associated with it. In the cases
where the consultant team identified a lease document, the project lease agreement required the developer to
pay all taxes and fees associated with project development.

Property tax rates vary by jurisdiction and different methods to appraise property are available to county
assessors to use to determine the value of both real and personal property. For 2023, the average property tax
rate across all counties was $8.70 per $1,000 of assessed value, or approximately 0.87 percent including all
state and county levies.65 The state portion was approximately one third of property taxes at $2.33 in 2023.

Average local regular levies (e.g., county general funds) were $3.48 while local special levies (e.g., school
enrichment levies) were $2.80 in 2023. Total rates ranged from a maximum rate of $14.18 in Whitman County
to a minimum of $5.67 in San Juan County. The difference is largely driven by local levies with relatively
consistent state levies across counties. For example, San Juan had the smallest local special levy at under $1,
while Whitman’s was the highest at over $5. It is worth noting that statewide between 2022 and 2023 the
average county rate dropped by approximately $1.

Personal property
Personal property tax is levied on the items used by businesses; for example, machinery, equipment, supplies,
and tools. In the context of energy development, personal property includes turbines and towers for wind
projects and panels and panel mounts for solar projects. Personal property is taxed at the same rate as real
property based on assessed value.

One important distinction between personal property and real property is that personal property is expected to
depreciate over time as items age. As a result, the assessed value of personal property and therefore the taxes
paid decreases over time. Washington DOR provides a set of schedules that project depreciation year-over-
year as a percentage of the initial purchase value. As of 2023, there are two depreciation schedules, one
schedule for clean energy generation projects and a second schedule applicable to battery storage systems.
The DOR guidelines recommend a four-step process for county officials using their assessment guidelines and
depreciation schedules:

1) Determining the appropriate class/type of property (e.g., Renewable Energy Generating facilities for solar
   panels)

2) Identifying the depreciation trend for that property type (e.g., the trend for clean energy generating facilities
   - “Trend RG”)

3) Locating the applicable “percent good factor” based on the age of the property (e.g., 88.1% for a four-year-
   old solar facility)

4) Multiplying the percent good factor by the historical or original cost to determine the current value (e.g.,
   88.1% multiplied by the total cost, say $50 million, equaling a value of $44 million for a four-year-old
   facility)



65 Department of Revenue Washington State, “Tax Statistic Report 2023,” n.d., https://dor.wa.gov/about/statistics-reports/property-tax-

statistics/property-tax-statistics-2023.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              58
Chapter 82.96 RCW — tax on renewable energy generation or storage
The consultant team also considered the recently enacted changes to clean energy taxation under SHB 1756,66
which defers the state portion of property taxes in favor of a production tax based on the installed MW
capacity.

SHB 1756 passed in 2023 and applies to projects in production or construction as of June 2023. It is an
optional exemption, so it is up to project owners to apply for the exemption with Washington DOR. If they apply
and are approved, they will pay the production excise tax instead of state personal property taxes; county
personal property taxes are unaffected by the legislation. The incentive for a developer would be a potentially
lower personal property tax if the production excise tax is lower than their expected personal property tax.

The production excise tax rates established in SHB 1756 are:

       •   Either $75 per month per MW of nameplate capacity for 15 years or $80 per month per MW of
           nameplate capacity for 10 years for a system that uses solar energy to generate electricity and was
           granted a personal property tax exemption
       •   Either $130 per month per MW of nameplate capacity for 15 years or $150 per month per MW of
           nameplate capacity for 10 years for a system that uses wind energy to generate electricity and was
           granted a personal property tax exemption
       •   Either $14 per month per MWh of clean energy storage capacity for 15 years or $19 per month per
           MWh of clean energy storage capacity for 10 years for battery storage capacity granted a personal
           property tax exemption

All revenues collected from the production excise tax are deposited into a Renewable Energy Local Benefit
Account. Under SHB 1756, funds under this account must be distributed as follows:

       •   42.5% of excise tax paid by a clean energy system located in a county must go to that county
       •   42.5% must go to qualified school districts in the county, in proportion to the number of students
           served by the school district
       •   15% must go to qualified federally recognized Indian tribes with rights or protected lands potentially
           impacted by a clean energy system

The state fiscal note for the legislation estimates that it will cost the state $60,000 in fiscal year 2025
increasing to $280,000 by FY 2027. It estimates that the exemption will be a net benefit for counties, with
counties and school districts each receiving an additional $25,500 in FY 2025, $89,250 in FY 2026 and
$119,000 in FY 2027 with the remainder (approximately $4,900 to $42,000) going to federally recognized
Tribes (FY 2025 through FY 2027).67

During discussions with county officials, the consultant team heard concerns and confusion from several
officials about SHB 1756 adversely affecting their county taxes. Based on discussions with DOR and review of
the bill language, it is intended to solely apply to the state portion of personal property taxes. It will not
adversely affect county taxes and is expected to result in a loss of revenue for the state and a gain for the
counties through the redistribution of the state production excise tax.




66
     Supporting clean energy through tax changes that increase revenue to local governments, schools, and impacted communities.
67 State of Washington, “Multiple Agency Fiscal Note Summary: HB 1756, Clean Energy/Tax Changes,” n.d.,

https://fnspublic.ofm.wa.gov/FNSPublicSearch/GetPDF?packageID=66577.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            59
Property tax across projects
The case study projects, as well as other projects in the state, generate significant amounts of property tax for
their respective jurisdictions. Personal property tax is significantly larger than real property tax for all projects
reviewed. Table 11 summarizes the personal and real property taxes for the six operating case study projects.
Large wind and solar projects (i.e., over 100 MW) generate over $1 million in personal property tax payments
annually. Smaller projects generate less personal property revenue.

All personal property assessments will depreciate over time. Table 12 summarizes an estimate of the tax
collections in year 22 of the project, which is when the projects have fully depreciated according to the
Washington DOR schedule. Real property would be expected to appreciate over time with taxes increasing.
Farm property land value grew at approximately 4% over the past 20 years, so the consultant team assumes
the same rate.68 The impact on county taxes varies considerably and is evaluated further in the County Taxes:
Short- and Long-term Effects section below.

Table 11. Historical property tax collections for operating case study projects
                                                                           Year 1          Year 1
                                                        Initial                                                                                    Average %
                                   Project type                            Personal        Real          Year 1 Total        Year 1 Total
 Project             County                             Assessed                                                                                   of County
                                   (MW capacity)                           Property        Property      Project Tax         County Tax
                                                        Value                                                                                      Tax Roll
                                                                           Tax             Tax

 Rattlesnake                       Wind (144                               $1.3
                     Adams                              $130 million                       $23,000       $1.4 million        $28 million           4.8%
 Flat                              MW)                                     million

                                   Solar (150                              $1.0
 Lund Hill           Klickitat                          $160 million                       $5,600        $1.1 million        $100 million          1.0%
                                   MW)                                     million

                                   Wind (267                               $1.8
 Tucannon            Columbia                           $230 million                       $67,000       $2.4 million        $9.3 million          20.2%
                                   MW)                                     million

                                   Wind (136                               $2.1
 Skookumchuck Lewis                                     $280 million                       $19,500       $2.3 million        $110 million          2.0%
                                   MW)                                     million

 Columbia            Kittitas      Solar (15 MW)        $18 million        $140,000        $9,400        $150,000            $100 million          0.14%

                                   Solar + BESS
 Horn Rapids*        Benton                             $0                 $0              $0            $0                  $0                    N/A
                                   (4 MW)

*Horn Rapids site is tax exempt due to its status as an educational facility.
All values are for the first full year of operation, regardless of the year the project started. Since counties and tax districts have different tax rates, similar
assessed values will not yield the same amount of tax in each jurisdiction.
All dollar values are in 2023 USD to allow for comparison.
Sources: Adams County TaxSifter, accessed on March 20, 2024 at https://adamswa-taxsifter.publicaccessnow.com/Search/Results.aspx,
Klickitat County Property Search, accessed on May 9, 2024 at http://www.klickitatcountytreasurer.org/propertysearch.aspx,
Columbia County Assessor & Treasurer, accessed on April 12, 2024 at http://64.184.153.98/PropertyAccess/PropertySearch.aspx?cid=0,
Lewis County Treasurer Parcel Database. https://parcels.lewiscountywa.gov/,
Kittitas County TaxSifter, accessed on April 30, 2024 at https://taxsifter.co.kittitas.wa.us/Search/Results.aspx




68 United States Department of Agriculture, “National Agricultural Statistics Service Quick Stats Database, Agricultural Land Value (Incl.

Buildings) Asset Value: 2003-2023,” n.d., https://quickstats.nass.usda.gov/.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                          60
Table 12. Estimated future property tax collections for operating case study projects
                                        Estimated Year 22               Estimated Year 22          Year 22 Total            Total Property Tax
 Project               County           Personal Property Tax           Real Property Tax          Project Tax              Percentage Change
                                        Collections                     Collections                Collections              from Year 1

 Rattlesnake Flat      Adams            $200,000 – $250,000             $59,000                    $300,000                 -78%

 Lund Hill             Klickitat        $170,000                        $14,000                    $180,000                 -83%

                                                                                                   $520,000 to
 Tucannon              Columbia         $350,000 – $430,000             $166,000                                            -75 to -78%
                                                                                                   $600,000

                                                                                                   $350,000 to
 Skookumchuck          Lewis            $300,000 – $350,000             $54,000                                             -83 to -85%
                                                                                                   $400,000

 Columbia              Kittitas         $22,000                         $24,000                    $46,000                  -70%

 Horn Rapids*          Benton           --                              --                         --                       N/A

*Horn Rapids site is tax exempt due to its status as an educational facility.
All dollar values are in 2023 USD to allow for comparison.
Year 22 values are illustrative examples and assume tax rates remain constant. Real property is assumed to appreciate at approximately four percent
per year.

Source: IEc analysis based on Year 1 tax data (Table 11) WA DOR depreciation schedule for personal property (Personal Property Valuation Guidelines,
Washington State department of Revenue. Accessible at: https://dor.wa.gov/taxes-rates/property-tax/personal-property-valuation-guidelines) and USDA
land value trends for the past 20 years (USDA NASS. Agricultural Land Value (Incl. Buildings) Asset Value: 2003-2023).

These findings are generally consistent with public literature. A study examining the economic impacts of wind
energy in rural Texas by De Silva, et al., (2016) found that the addition of clean energy projects to a county will
decrease the overall county property tax rate while increasing the total value of the tax base.69 As a result,
counties tend to see an increase in property tax revenues that starts high and depreciates over time.

One study estimates the potential property tax revenue from $100 million invested in clean energy
developments in Klickitat County to be approximately $140,000 in year one, declining to about $75,000 in year
10. Across comparable counties in the rural western U.S., tax impacts vary widely but tend to be more
substantial for counties with small tax bases and high tax rates.70

Sales tax
Sales tax is collected at the state, county, and local level. Projects also pay sales tax on equipment, machinery,
and labor purchased to construct a project. The state sales tax rate is 6.5% plus an additional county and local
sales tax rate, which varies by jurisdiction. The highest combined county and local sales tax in 2023 was 4.1%
(i.e., 10.5% total) in multiple areas of Spokane County, while the lowest is 1% percent (i.e., 7.5% total) in
multiple counties.71 The average local sales tax, without weighting for the amount of tax collected, was 8.7%.




69 Dakshina G. De Silva, Robert P. McComb, and Anita R. Schiller, “What Blows in with the Wind?,” Southern Economic Journal 82, no. 3

(January 2016): 826–58, https://doi.org/10.1002/soej.12110.
70 Julia H. Haggerty, Mark Haggerty, and Ray Rasker, “Uneven Local Benefits of Renewable Energy in the US West: Property Tax Policy

Effects,” Western Economics Forum 13, no. 1 (2014).
71 Department of Revenue Washington State, “Tax Statistic Report 2023.”




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                61
Importantly, local sales tax is collected by the county in which the equipment is installed, rather than the
jurisdiction in which the purchase is made.

Senate Bill (SB) 5116
Under RCW Chapter 82.08, the state offers projects the opportunity to receive sales tax exemptions related to
the sale of clean energy equipment and machinery. In 2013 the Legislature extended this incentive through
January 2020. In 2019, as part of the bill enacting the Clean Energy Transformation Act, the Legislature
extended the exemption through January 2030 and revised the criteria and refund options for developers.72

Historically, projects could only receive a 75% reduction, which multiple case study projects received.
Following SB 5116, eligible applicants may receive varying reductions in qualified sales tax if they meet certain
workforce objectives:

    •      50% reduction if the Department of Labor and Industries (L&I) certifies the project includes
           procurement and contracts with women, minority, or veteran owned businesses; entities that have a
           history of complying with federal and state wage and hour laws; apprenticeship utilization; and/or
           preferred entry workers living in the project construction area
    •      75% reduction if, in addition to meeting the 50% standard, the project compensates workers at
           prevailing wages determined by local collective bargaining
    •      100% reduction if L&I certifies the project is developed under a community workforce agreement or
           project labor agreement

Sales tax across projects
Table 13 presents estimated sales tax collected for each case study project. Sales tax rates differ across
counties examined, ranging from 7.5% to 8.7%. The effect of sales tax returns to the county depends on which
of the exemptions the projects received. For purpose of this analysis, the consultant team assumes that all
projects received the 75% exemption.

Table 13. Estimated sales tax collection for case study projects during construction
                                                                               Portion of
                                                                                               County Sales
                                           Overall Sales   Total Project Sales Project Sales                 County Sales
Project                  County                                                                Tax Exemption
                                           Tax Levy        Taxes               Taxes to                      Tax to County
                                                                                               Back to State
                                                                               County

Rattlesnake Flat         Adams             0.08            $14 million         $2.6 million    $1.9 million   $640,000

Lund Hill                Klickitat         0.075           $7.4 million        $990,000        $740,000       $250,000

Tucannon                 Columbia          0.082           $26 million         $5.4 million    $4.1 million   $1.4 million

Skookumchuck             Lewis             0.078           $13 million         $2.1 million    $1.6 million   $530,000

Horn Rapids              Benton            0.087           $630,000            $160,000        $120,000       $40,000

Columbia                 Kittitas          0.081           $800,000            $160,000        $120,000       $40,000

Planned Projects         -                 -               -                   -               -              -

Carriger                 Klickitat         0.075           $11 million         $1.5 million    $1.1 million   $370,000




72 https://app.leg.wa.gov/BillSummary/?BillNumber=5116&Year=2019&Initiative=false




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       62
                                                                                          Portion of
                                                                                                                 County Sales
                                                   Overall Sales      Total Project Sales Project Sales                        County Sales
 Project                      County                                                                             Tax Exemption
                                                   Tax Levy           Taxes               Taxes to                             Tax to County
                                                                                                                 Back to State
                                                                                          County

                                                                      $99 million to $118 $25 million to $19 million to             $6.3 million to
 Horse Heaven                 Benton               0.087
                                                                      million             $30 million    $22 million                $7.4 million

 Desert Claim                 Kittitas             0.081               $8.5 million            $1.7 million      $1.3 million       $420,000

The above data is based on JEDI-derived project costs per kW and assumes that 75 percent of the county sales tax portion goes to the state. All dollar
values are in 2023 USD.

Overall, sales taxes increase during the construction phase of a project; however, they could be higher if a
project does not have an exemption from the state that refunds both state and local sales taxes. County
officials raised concerns regarding the timing and management of the sales tax exemption. Counties receive
the full amount of sales tax, and then the developer requests and files for the refund with the state. Once this is
processed, the county must return the sales tax to the state to refund the developer.

Multiple county officials said that this process was poorly communicated and that they were unaware of the
refund before the state requested it, causing some confusion for their tax and financial planning. To achieve a
refund under the sales and use tax provisions revised in 2019, developers must have a signed and approved
Application for Clean Energy Labor Standards Certification from the state prior to the start of the project (i.e.,
the state should be aware of the refund ahead of construction and be able to alert counties). The previous law
did not specify a timeline for developers to apply for the tax refund, but it did require records for validation and
one county official stated that a business could request the refund within four years. Three case study
counties mentioned having to refund taxes well after receiving the funds.

County taxes: Short- and long-term effects
Overall, clean energy projects can contribute to notable increases in local property tax payments. While all
case study projects experienced an increase in property taxes relative to the previous land use, primarily
through sales tax and personal property taxes, the relative impact varied dramatically based on the baseline
size of a county’s tax base. Table 11, in the Property tax across projects section, summarizes some examples
of this using tax data from the case studies with a percentage for the total county collections. These increases
in taxes are both short- and long-term; however, depreciation affects the amount of personal property taxes
collected over time.

Examples of these patterns can be seen in Lewis and Garfield counties (Figure 9), which have seen the
installation of a large wind energy project within the past two decades. However, the size of the tax base
before the projects were installed makes a big difference in how much the addition of a wind farm impacts the
county’s tax collections.73 In Lewis County, which has a relatively large tax base, the addition of the 136 MW
Skookumchuck Wind Project brought in extra tax revenue to the county; however, the impact to the total tax
collections is relatively small, with the project only making up a maximum of 2% of the county’s total tax
collections. Lewis County includes the population centers of Centralia and Chehalis, both of which have
approximately as many residents as Garfield County.




73 Note: The Lower Snake River Wind Farm project was not included in the list of case study projects. However, the countywide tax data

for Garfield County and associated wind projects was provided at a public meeting and is thus included here as part of the analysis.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                63
In Garfield County, the addition of the larger 343 MW Lower Snake River Wind Farm in 2012 caused tax
collections to increase significantly at first. From 2014 to 2019, the project brought in an average of 49% of the
tax collections. In 2020, however, tax collections from the project began to decline, thus decreasing the total
property tax collection over time. By 2023, tax collections from the project reached 43% of the tax base, and as
previously discussed, contributions will continue to decline over time due to asset depreciation.

While the Lower Snake River Wind Farm project is larger than Skookumchuck, the payments to Garfield County
would not represent more than five percent of Lewis County’s tax collections, even at their peak. For nearly half
of counties in Washington, the payments from the Lower Snake Wind project would be less than 2.5% of the
total tax base as of 2022.

For the counties with a smaller tax base like Garfield, Columbia, Ferry, and Wahkiakum, such an injection of $2
million to $3 million dollars from a project’s taxes can be a major contribution (i.e., more than a fifth of their tax
collections). Of the nine case studies reviewed, six are in counties with tax collections below the median
county collections of approximately $105 million as of 2022. Four projects are in counties with collections
below $50 million.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                             64
Figure 9. Comparison of county tax collections over time




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   65
Local effort assistance (LEA) and school funding
A potential increase in tax revenue also results in benefits to other community services, such as local and state
schools, county roads, and county government. Some studies show that an increase in tax revenue from clean
energy development brings about concrete benefits in local schools, while other studies find no significant
changes in the quality of local educational institutions.74 Regardless of the degree of increase in tax revenue,
the addition of another source of tax revenue helps make schools and other community services within the
resident county less susceptible to changes in federal or state funding.75

In addition to boosts from new taxable assets, some school districts receive local effort assistance payments
(LEA). LEA, also known as levy equalization, is a state education funding program to ensure that school
districts with smaller tax bases receive a set amount of funding per student. LEA payments ensure a school
district raises at least $1,550 per student when levying a rate of $1.50 per $1,000 of assessed value (i.e., it
ensures that districts with lower property values do not have above average tax rates to maintain education
activities).

While local clean energy projects do not determine local levy rates and LEA payments, they do affect taxes,
and some participants at public meetings voiced concern about school districts losing LEA funding due to
wind turbines increasing the baseline property taxes for the county and district.

An evaluation of clean energy project impacts on LEA is complicated by changes in the funding mechanisms
and levies from legislation enacted in 2017 (Chapter 13, Laws of 2017 (EHB 2242)).76 This has led to a
significant drop off in LEA payments since 2018, with some districts losing all LEA funds.

At the Dayton public meeting, a district with one existing wind project in the vicinity of the specific school
district was highlighted. The nearby project was built before 2019 and therefore was not included in the study
scope or as a case study. Based on tax data, the project close to the district of concern is depreciating in
assessed value, with decreases from 2019 to present. However, these changes in assessed value do not align
with changes in LEA funding in the district. Review of state education funding data does show that the
district’s LEA funding ($12,000 in 2016 and $50,000 in 2018) was zero in 2017 and from 2019 to present, but
this is consistent with LEA decreases across the state from the revised taxation law. Overall, the impacts of
clean energy projects on LEA do not seem significant relative to the recent changes to the law surrounding
these funds.

In addition, since LEA is based on a set levy rate and a funding level per student, changes in taxes collected
from wind turbines should not result in a net loss in school funding but instead should be a redistribution of
where that funding is coming from. Should a project depreciate over time and reduce the amount of tax that a
school district is receiving below the LEA threshold, the district would begin to receive LEA again.




74 De Silva, Dakshina G., Robert P. McComb, and Anita R. Schiller. “What Blows in with the Wind?” Southern Economic Journal 82, no. 3

(2016): 826–58. http://www.jstor.org/stable/44283478.;
Castleberry, Becca, J. Scott Greene. “Impacts of wind power development on Oklahoma’s public schools.” Energ Sustain Soc 7, 34
(2017). https://doi.org/10.1186/s13705-017-0138-8
75
   Ibid., Castleberry
76 “Funding Fully the State’s Program of Basic Education by Providing Equitable Education Opportunities through Reform of State and

Local Education Contributions,” Pub. L. No. House Bill 2242 (2017), https://app.leg.wa.gov/billsummary?Year=2017&BillNumber=2242.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              66
Summary of findings
Projects bring tax revenues to counties. Questions include whether the impacts are sustained over time and
how the changes to tax payments over the years affect the counties in which they are located, particularly as
projects depreciate over time.

State and local taxes are collected from clean energy projects in three primary methods: real property tax (land
and buildings), personal property tax (equipment and machinery), and sales tax. Property tax, whether real or
personal, is taxed at the same rate within each county. Property tax rates vary county by county from $5.87 per
$1,000 of assessed value up to $14.18 per $1,000 of assessed value (or 0.0587% to 0.14% of assessed value).
Sales tax is levied separately from property tax, with a statewide sales tax rate of 6.5%, plus an additional
county and local sales tax, which is typically 2%.

Turbines and solar panels are taxed as personal property. Across case study projects, clean energy projects
contributed far more to total county personal property taxes than real property taxes due to the high values of
equipment assessed at these sites. While assessed values for equipment are high following project
construction, personal property is depreciated over time, which would reduce local taxes collected over time,
all else equal. This study showed that projects often reinvest in projects, resulting in a slower depreciation in
taxes over them that would otherwise be expected from the depreciation schedule.

Sales tax is collected on all labor and materials purchased for a project, which primarily occurs during the
construction phase. Sales tax collections also provide additional economic stimulus to project counties,
despite the presence of a sales tax exemption that can be 50%, 75%, or 100% of state and county sales taxes
on clean energy project purchases.

All case study projects experience an increase in local taxes relative to previous land uses, primarily driven by
sales and personal property taxes. For counties with a smaller tax base, clean energy projects comprise a
larger share of total property taxes (inclusive of both real and personal property). Potential increases in tax
revenues can also benefit school funding and local services; however, there were some concerns that these
increases may affect state school funding through local effort assistance payments that ensure school
districts receive a set level of funding. Between 2016 and 2024, the consultant team did not find any specific
examples of this benefit stream reduced in a county where a case study project was developed.

County officials provided additional input on how the current landscape of clean energy development taxation
affects local economies. Clean energy projects can be centrally assessed by DOR or locally assessed by a
county’s Office of the Assessor. Central assessment determined by DOR occurs for statewide utilities or
projects that cross county boundaries. Of the case study projects reviewed, two wind projects were centrally
assessed: Skookumchuck (in both Lewis and Thurston Counties) and Tucannon (owned and operated by
Portland General Electric). All other case study projects were locally assessed.

While counties have the authority to locally assess parcels that contain clean energy development, some
county officials noted that they lack the expertise for conducting these assessments as well as for advocating
for themselves upon appeal by developers. However, a drawback of central assessment is that county officials
may not be able to understand or anticipate changes in assessed values from year to year, noting that they
often receive updated assessments from the state close to the end of the budget development period, offering
little room for budget adjustments in response to changes.

County officials also expressed concern about the optional wind and solar excise tax alternative to property
taxes enacted in 2023 (Chapter 82.96 RCW), which allows projects to be exempt from state personal property


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                          67
tax in favor of a new clean energy production excise tax.77 Assessors noted that the law dictates which taxing
districts may receive funds distributed to counties from the excise taxes, which may adversely affect some
districts. County officials also fear that the law may be updated to include both state and county tax
collections, which could substantially alter how funds are distributed within the county taxing districts. Due to
these concerns and others, such as the depreciation of projects over time, some county officials suggested
taxing clean energy projects as a standalone tax category instead of as personal property.




77 Supporting clean energy through tax changes that increase revenue to local governments, schools, and impacted communities.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          68
Findings: Evaluation of direct, indirect, and induced jobs
in construction and operations
Background
Community members and representative interests inquired about the effect of renewable energy projects on
local employment. They expressed concerns that projects sited in rural areas do not adequately leverage and
benefit local economies. This section describes the extent of jobs impacts that project construction and
operations have had or may have in Washington.


Direct investments
To model the impacts of clean energy on local economies, the consultant team first estimated the total costs
of installing and operating each project to understand the level of investment in the local economies that these
projects may have. Ideally, these estimates would include details about specific expenditures with the names
of contractors who received funds for the work.

Unfortunately, developers are not required to make these costs publicly available, although the costs of
infrastructure elements are provided to the state or counties for tax assessment purposes. Some developers
provide estimates of total investments in press releases, but these estimates often combine direct
investments with internal estimates of project effects on regional activity, and therefore are not useful as
inputs for modeling job effects. Similarly, specific job demands are not required to be reported.

Because the project investments were not available, the consultant team used average construction and
operation costs by project phase for each sector on a per MW capacity basis based on assumptions. While
imperfect, this method provided a working estimate from which the consultant team could assess the likely
level of local investment by projects even without developer input.

For solar photovoltaic system components, the consultant team used the model assumption of $1,030 per kW
for project installation and capital expenditure costs (2023 USD). Similarly, the consultant team assumes that
project operation and maintenance (O&M) costs are $20 per kW (2023 USD).78 These costs were then
distributed across a suite of cost categories, including (but not limited to) materials, equipment, labor, and
permitting for both construction and operation phases.

For onshore wind system components, the consultant team used the model assumption of $1,531 per kW for
project installation and capital expenditure costs (2023 USD). Similarly, the consultant team assumed that
project O&M costs are $38 per kW (2023 USD).79 These costs were then apportioned to a similar set of cost
categories as the solar PV JEDI model.

JEDI does not currently include cost data on battery storage systems. As shown in Table 14, the consultant
team relied on literature to arrive at a dollar figure for the cost of construction and operation. The consultant
team then used GDP deflators from the Office of Management and Budget (OMB) (2023) to adjust cost


78 National Renewable Energy Laboratory (NREL), “Jobs & Economic Development Impact (JEDI) Wind Models Rel. W6.28.19.,” n.d.,

https://www.nrel.gov/analysis/jedi/wind.html.
79 Ibid.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          69
estimates to 2023 dollars and use the Impact Analysis for Planning (IMPLAN) input-output model to evaluate
the impacts of this component of Washington’s economy.80

Table 14. Battery energy storage system cost references.81
Project                                                           Source

Horn Rapids Solar, Storage and Training                           Pacific Northwest National Laboratory (2022)

Carriger Solar                                                    Magnum Economics (2022)

Horse Heaven Clean Energy Center                                  U.S. EIA (2023), Northwest (NWPP) region


Modeling jobs impacts
The consultant team developed an estimate of job effects using the JEDI model for solar PV and onshore
wind. For battery storage facilities, the consulting team supplemented this modeling with IMPLAN model. Both
JEDI and IMPLAN are input-output models that estimate the direct, indirect (supplier), and induced (consumer
spending) effects associated with project expenditures.

The U.S. DOE developed JEDI to improve the specificity of input-output models to assess the economic effects
of operating and planned clean energy development.82 JEDI has multiple models available for assessing the
regional economic impacts of solar photovoltaics and onshore wind, among other technologies. Both models
evaluate the spending effects on jobs, earnings (employee wages, salaries, and benefits), value added (market
value of a region’s goods and services), and economic output (value added plus the value of intermediate
goods and services used to produce products for final consumption).

As of July 2024, there is no dedicated JEDI model for battery storage, so the consultant team relied on
IMPLAN for this technology. When modeling battery storage component-related impacts in IMPLAN, the
consultant team assigned input expenditures to the “Storage Batteries” category (IMPLAN Industry 3333) and
applied an IMPLAN assumption that approximately 48% of expenditures in this industry are spent in
Washington.83

Available employment pool
Table 15 presents occupations of residents within the project census tracts, project counties, and Washington,
as broadly grouped by the ACS. Employment is higher within natural resources and construction in the relevant
census tracts (14%) and project counties (14%) than average in Washington (9%).




80 White House Office of Management and Budget (OMB), “Gross Domestic Product and Deflators Used in the Historical Tables: 1940–

2029,” n.d., https://www.whitehouse.gov/omb/budget/historical-tables/.
81 Xu Ma, Di Wu, and Aladsair Crawford, “Energy Northwest – Horn Rapids Solar and Storage: A Techno-Economic Assessment,” August

1, 2022, https://doi.org/10.2172/1894860; Mangum Economics, “Carriger Solar Economic & Fiscal Contribution to Klickitat County and
the State of Washington” (Cypress Creek Renewables, 2022),
https://www.efsec.wa.gov/sites/default/files/230001/001/Attachment_J_Carriger_Socioeconomic_Report.pdf.; U.S. Energy
Information Administration, “Cost of Performance Characteristics of New Generating Technologies, Annual Energy Outlook 2023,”
2023, https://www.eia.gov/outlooks/aeo/assumptions/pdf/elec_cost_perf.pdf.
82 National Renewable Energy Laboratory (NREL), “Jobs and Economic Development Impact (JEDI) Models,” NREL/FS-5000-64129

(Golden, CO (US), 2015).
83 IMPLAN Support, “Input-Output & Social Accounting Matrix Structure,” 2023, https://support.implan.com/hc/en-

us/articles/18943702175003-Input-Output-Social-Accounting-Matrix-Structure..


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                         70
This suggests clean energy projects sited within these areas could potentially leverage local construction and
maintenance workforces. Production, transportation, and material moving industries are either similar or
slightly more common in relevant census tracts (12%) and project counties (13%) compared to the state
average (12%).

Table 15. Occupation of residents near study projects, 2018-2022
                                                     Total employment in Census            Total employment in case   Employment in
 Occupation                                          tracts intersected by case            study project counties     Washington
                                                     study projects* (% of total)          (% of total)               (% of total)

 Management/Business/Science/Arts                    6,359 (41%)                           65,406 (38%)               1,664,322 (44%)

 Sales/Office                                        2,819 (18%)                           30,945 (18%)               697,384 (19%)

 Service                                             2,266 (15%)                           29,047 (17%)               595,994 (16%)

 Production/Transportation/Material Moving 1,829 (12%)                                     22,314 (13%)               443,300 (12%)

 Natural Resources/
                                                     2,136 (14%)                           22,975 (14%)               351,076 (9%)
 Construction/Maintenance

 Total                                               15,409 (100%)                         170,687 (100%)             3,752,076 (100%)

* These estimates include all census tracts that intersect with any of the case study project boundaries.
Source: 2022 ACS 5-Year Survey.


Review of studies of job effects of solar and wind developments
As shown in Table 16, analyses of project impacts in rural U.S. counties support evidence for increased
employment demand ranging from 0.5 to six jobs per MW of wind or solar power capacity for the construction
phase and 0.1 to 2.5 jobs per MW during the operations phase. Existing studies suggest that developers often
rely on non-local or international manufacturers and labor brought in from outside local communities to
assemble the turbines and panels, limiting the number of local job opportunities provided by these projects.84
Examples of reviewed studies include:

     •     Kotarbinski et al. (2020) estimates the total number of O&M full-time equivalent (FTE) jobs per MW of
           installed capacity of land-based wind energy development. NREL calculated this estimate from the
           entire fleet of land-based wind energy plants in the United States as of November 2019.85
     •     BW Research Partnership (2024) modeled technology-specific job impacts associated increased clean
           energy development if the Northwest were on the path to net-zero emissions and found that
           Washington could gain over 1,000 jobs in wind energy and nearly 600 jobs in solar by 2030. They then
           estimated the average total jobs per million U.S. dollar invested and total jobs per MW capacity. BW
           Research Partnership also uses JEDI and IMPLAN to estimate investments and associated job impacts
           but includes both distributed and utility-scale projects.86



84 Max Wei, Shana Patadia, and Daniel M. Kammen, “Putting Renewables and Energy Efficiency to Work: How Many Jobs Can the Clean

Energy Industry Generate in the US?,” Energy Policy 38, no. 2 (February 2010): 919–31, https://doi.org/10.1016/j.enpol.2009.10.044.
85 Matthew Kotarbinski, David Keyser, and Jeremy Stefek, “Workforce and Economic Development Considerations from the Operations

and Maintenance of Wind Power Plants,” (Golden, CO (US): National Renewable Energy Laboratory (NREL), December 2020),
https://www.nrel.gov/docs/fy21osti/76957.pdf.
86 BW Research Partnership, “CETI: Net-Zero Northwest Workforce Analysis Technical Report,” November 2023,

https://www.nznw.org/files/workforce-analysis-technical-report-regional.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                   71
The consultant team also received local wind industry employment information from an economic
development agency that serves a county with wind energy development.87 The consultant team used
company-specific estimates of annual employment and total capacity data to calculate an average total jobs
per MW capacity from 2017 to 2022 of 0.084. The specific companies and county that the employment data is
associated with are kept anonymous for confidentiality.

Table 16. Job impacts literature review summary
                                                         Job Effects:                               Income Effects:
                                      Scope of           Construction       Job Effects:            Construction and Income Effects:
 Author(s)         Year Journal
                                      Analysis           and Installation   O&M Phase               Installation     O&M Phase
                                                         Phase                                      Phase

 Wind Projects     -      -           -                  -                  -                       -                   -

                                                                            *included in                                *included in
                          Energy
 Brown et al.      2012               United States      0.5 jobs/MW*       construction phase      $11,000/MW*         construction phase
                          Economics
                                                                            estimate                                    estimate

                                      Northwest United
                                                                            *included in
 BW Research                          States (Idaho,
                   2024 N/A                              1.1 jobs/MW*       construction phase      --                  --
 Partnership                          Montana, Oregon,
                                                                            estimate
                                      Washington)

                        Southern                                                                    Per capita county   *included in
                                                         No significant
 de Silva et al.   2016 Economic      Rural Texas                           No significant effect   income = +          construction phase
                                                         effect
                        Journal                                                                     $2,657/MW*          estimate

 Kotarbinski et
                   2020 N/A           United States      --                 0.086 jobs/MW           --                  --
 al.

 NREL              2009 N/A           United States      4-6 jobs/MW        0.3-0.6 jobs/ MW        --                  --

                          Energy
 Wei et al.        2010               United States      0.79 jobs/MW       0.69 jobs/MW            --                  --
                          Policy

 Solar Projects    -      -           -                  -                  -                       -                   -

                                      Northwest United
                                                                            *included in
 BW Research                          States (Idaho,
                   2024 N/A                              1.9 jobs/MW*       construction phase      --                  --
 Partnership                          Montana, Oregon,
                                                                            estimate
                                      Washington,)

                          Energy
 Wei et al.        2010               United States      5.1 jobs/MW        2.5 jobs/MW             --                  --
                          Policy


Regional economic impacts of case study projects
Tables 17 and 18 present modeled estimates for each case study for the construction phase and O&M phase,
respectively.88 For each project, the consultant team evaluated the effects of the estimated direct investments
on FTE employment and economic output and calculated a multiplier that reflects the economic stimulus to
Washington per dollar of clean energy investment, which ranged from $0.32 to $0.62 of output per dollar
invested for the construction phase (one time effects), and $0.65 to $1.37 per dollar invested in operations and




87 Personal communication with County economic development agency, May 2024.
88
  As of June 2024, the total capacity of the proposed Horse Heaven Clean Energy Center project is unclear. To reflect this uncertainty,
the consultant team performs their jobs analysis for a range of proposed project sizes that have been discussed between EFSEC and
Washington State governmental officials.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                       72
maintenance (ongoing costs). This output reflects the assumption that investments in turbines and other
components are not spent in the state, while operations phase expenditures would be made within the state.

The analyses were run at the state level. While local workforces are involved in some capacity during both
construction and operations phases, data do not exist to quantify the portion of jobs that are local to the
counties in which projects operate. Some portion of jobs require a level of technical expertise that cannot be
filled locally, especially during the construction phase; although the consultant team was unable to find public
data to further clarify a more granular breakdown of job creation.89,90

Table 17. Regional economic impacts of the case study projects, construction phase

                                              Capacity      Estimated project                           Output (2023          Output per $
 Project                     Status                                           Jobs (FTEs)
                                              (MW)          costs (2023 USD)                            USD)                  invested

 Columbia Solar              Operating        15            $15 million           68                    $10 million           $0.62

 Horn Rapids Solar,
                             Operating        4             $11 million           40                    $7 million            $0.65
 Storage and Training

 Lund Hill Solar             Operating        150           $155 million          681                   $95 million           $0.62

 Tucannon River Wind
                             Operating        267           $409 million          744                   $133 million          $0.32
 Farm

 Skookumchuck Wind
                             Operating        137           $209 million          381                   $69 million           $0.33
 Facility

 Rattlesnake Flat Wind
                             Operating        144           $220 million          399                   $73 million           $0.33
 Project

 Carriger Solar              Planned          160           $205 million          890                   $140 million          $0.66

 Horse Heaven Clean                           975 to        $1.5 billion to                             $0.94 to $1.0
                             Planned                                              5,600 to 6,000                              $0.58 to $0.63
 Energy Center                                1,150         $1.8 billion                                billion

 Desert Claim Wind           Planned          100           $153 million          360                   $62 million           $0.40

Source: IEc analysis. Project costs for solar photovoltaic components are estimated by taking the product of the project’s rated capacity and the solar
photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) for the state of Washington. Job impacts associated with
the battery energy storage component are estimated by inputting costs from Magnum Economics (2022) into the input-output model IMPLAN, assuming
48.34 percent of expenditures are spent per IMPLAN’s Social Accounting Matrix (SAM). Project costs for onshore wind components are estimated by
taking the product of the project’s rated capacity and the onshore wind JEDI model’s default average cost value of $1,531 per kW (including sales tax)
for the State of Washington.

Note – Impacts include direct, indirect, and induced effects of construction spending, which are assumed to include spending on labor, materials,
equipment, permitting, and taxes. Some materials and equipment costs are assumed not to be spent locally. Estimated project costs include both in-
state and out-of-state expenditures. Both JEDI and IMPLAN are run at the state-level, meaning any local expenditures and job estimates are associated
with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.




89 Personal communication with Washington County assessors, treasurers, planers, and economic development directors.
90 Through personal communication with USDA Rural Development, since 2018, there are several renewable energy projects funded by

USDA’s Rural Energy for America Program (REAP) program sized between 500 kW and 1 MW that employ contractors based in
Washington State. USDA Rural Development posts rural investments by state and county at: https://www.rd.usda.gov/rural-data-
gateway/rural-investments/by-county.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                              73
Table 18. Regional economic impacts of the case study projects, O&M phase
                                                                 Annual operation
                                              Capacity                                    Annual          Annual output       Annual output per $
 Project                     Status                              and maintenance
                                              (MW)                                        jobs (FTE)      (2023 USD)          invested
                                                                 costs (2023 USD)

 Columbia Solar              Operating        15                 $300,000                 4               $410,000            $1.37

 Horn Rapids Solar,
                             Operating        4                  $80,000                  1               $110,000            $1.37
 Storage and Training

 Lund Hill Solar             Operating        150                $3 million               37              $4 million          $1.37

 Tucannon River Wind
                             Operating        267                $11 million              38              $7 million          $0.65
 Farm

 Skookumchuck Wind
                             Operating        137                $5 million               21              $4 million          $0.69
 Facility

 Rattlesnake Flat Wind
                             Operating        144                $6 million               22              $4 million          $0.69
 Project

 Carriger Solar              Planned          160                $3 million               39              $4 million          $1.37

 Horse Heaven Clean                                              $23 million to $30                       $28 million to
                             Planned          975 to 1,150                                230 to 260                          $1.12 to $1.21
 Energy Center                                                   million                                  $33 million

 Desert Claim Wind           Planned          100                $4 million               15              $3 million          $0.71

Source: IEc analysis. O&M costs for solar photovoltaic components are estimated by taking the product of the project’s rated capacity and the solar
photovoltaic JEDI model’s default average cost value of $20 per kW for the State of Washington. O&M costs for onshore wind components are
estimated by taking the product of the project’s rated capacity and the onshore wind JEDI model’s default average cost value of $38 per kW for the state
of Washington. Due to data limitations, estimates reflect annual job impacts associated with operation and maintenance of only the solar and/or wind
component of the system, but do not include impacts associated with the O&M of the battery storage facility. FTEs have a duration of one year.

Note – Impacts include direct, indirect, and induced effects of O&M spending, which are assumed to include spending on labor, materials, equipment,
and other services. O&M expenditures are assumed to be spent in the State of Washington. The JEDI model is run at the state-level, meaning any local
expenditures and job estimates are associated with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality).

Table 19 presents estimated job effects per million USD invested and per MW capacity during construction
and operations. As shown, estimated job effects during the construction phase are estimated to range from 2
to 10 jobs per million MW invested, or 3 to 10 per MW capacity. Job effects during the operations phase are
estimated to range from 4 to 13 jobs per million invested, or 0.1 to 0.2 jobs per MW capacity. Table 20
presents a summary of job impacts for all case study projects stratified by technology.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                               74
Table 19. Job impacts of the case study projects, per million dollars invested and MW
                                              Construction             Construction Phase:
                                                                                                   O&M Phase: Annual O&M Phase: Annual jobs
 Project                    Status            Phase: Total jobs        Total jobs per MW
                                                                                                   jobs per $M invested per MW capacity
                                              per $M invested          capacity

 Columbia Solar             Operating         5                        5                           13                         0.27

 Horn Rapids Solar,
                            Operating         4                        10                          13                         0.25
 Storage and Training

 Lund Hill Solar            Operating         4                        5                           12                         0.25

 Tucannon River Wind
                     Operating                2                        3                           3                          0.14
 Farm

 Skookumchuck Wind
                            Operating         2                        3                           4                          0.15
 Facility

 Rattlesnake Flat
                            Operating         2                        3                           4                          0.15
 Wind Project

 Carriger Solar             Planned           4                        6                           13                         0.24

 Horse Heaven Clean
                            Planned           3–4                      5–6                         9 – 10                     0.23 – 0.24
 Energy Center*

 Desert Claim Wind          Planned           2                        2                           4                          0.10

Source: IEc analysis. See notes to Tables 17 and 18 for additional analytical details.
*For this project, the consultant team took the central estimate of the calculated range of potential investments to include in their calculations for both
wind and solar PV.


Table 20. Summary of job impacts for case study projects by technology

                                                                               Average total jobs per MW               Average annual jobs per MW
 Technology                             Number of case study projects
                                                                               capacity, construction                  capacity, O&M

 Onshore Wind                           5                                      3.2                                     0.16

 Solar PV                               5                                      6.0                                     0.25

Source: IEc analysis. See notes to Tables 17 and 18 for additional analytical details.


School funding
The benefits of local jobs extend beyond the direct benefits of those employed. Clean energy jobs can also
bring employees with families to an area. If young children of employees are enrolled in local public schools,
the amount of school funding from the state increases, as such funding is disbursed on a per-pupil basis.

Most school funding comes from the state (about 76%-80% from 2018 to 2022). While many factors go into
the funding formula — including income levels, local cost of living, and special education needs — the state
distributed approximately $14,556 per student in the 2019-20 school year.91 Assuming that most maintenance
sites employ five to 15 people and that some of these employees have school-age children, additional income
to local schools could be in the hundreds of thousands of dollars per year.



91 Venice Buhain, “Breaking down WA’s School Funding Formula,” Crosscut, n.d., https://crosscut.com/news/2022/11/breaking-down-

was-school-funding-formula.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                    75
Summary of findings
Clean energy projects generate jobs during construction, and a smaller number of jobs during annual
operations.

Using regional economic models, the consultant team estimated the economic impact of projects. Note that
these are not actual confirmed job numbers from projects. Across all operating case study projects, during
project construction:

    •   Investments ranging from $11 million to $409 million are associated with 40 to 744 FTE jobs and $7
        million to $133 million in one-time economic contributions to Washington.
    •   For every dollar of investment (including both in-state and out-of-state expenditures), Washington
        receives $0.32 to $0.65 in economic stimulus. Job impacts during the construction phase range from
        two and five FTE jobs per million dollars of investment, and between three and 10 jobs per MW of
        capacity.

During project operations:

    •   Annual investments between $80,000 and $11 million are associated with one to 38 FTE jobs and
        $110,000 to $7 million of annual in-state economic contributions.
    •   For every dollar of investment during annual operations, Washington receives between $0.65 and $1.37
        in economic output. Job impacts during the operation and maintenance phase range from four and 13
        FTE jobs per million dollars of investment, and between 142 and 267 jobs per kW of capacity.

Projects that contain solar have a higher economic output per dollar of investment during both construction
and operation than onshore wind projects. Solar projects are also associated with a higher number of jobs per
MW during both construction and operations compared to onshore wind projects. Compared to the jobs per
MW estimates identified from the literature review, on average there are 0.5 to six jobs per MW estimates
during construction fall within the 0.5 to 6 range of MW capacity installed. The average jobs per MW estimates
during operation are also within the 0.1 to 2.5 range of MW capacity installed identified from the literature
review.

As shown in Table 20, for both technologies, the jobs per MW estimates are on the low end of the identified
jobs per MW ranges from the reference studies. However, there are several dissimilarities in geographic and/or
temporal scope between the analysis and each reference study. Furthermore, the results include both indirect
and induced job impacts, while many reference studies that evaluate wind energy O&M job impacts only
consider direct job effects.

There are also opportunities to encourage developers to hire local workforces. For example, under RCW
Chapter 82.0892 there is a tax exemption for certain clean energy investment projects, in which approved
applicants may receive a reduction of state sales and use taxes owed on machinery and equipment if they
involve local workers living within the project construction area. However, this exemption comes at a cost, as
previously discussed, in the form of reduced sales tax receipts to local jurisdictions.




92Washington State Legislature, “Exemptions—Sales of Machinery and Equipment Used in Generating Electricity,” n.d.,

https://app.leg.wa.gov/RCW/default.aspx?cite=82.08.962.≈


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                76
Findings: Evaluation of potential economic development
assistance and impact mitigation payments
Background
Communities and representative interests inquired whether and to what extent renewable energy projects
provide investments to communities in which they are located. Projects typically provide payments to
landowners in lease areas. In addition, the projects pay personal property taxes, which are collected by the
counties where they are located. This section discusses additional payments or benefits these projects have
provided to communities.

Benefits in the form of economic development assistance and impact mitigation payments can take many
different forms. There is no standardized definition on what constitutes a “community benefit,” and they can
range from formal agreements or jobs for local community members to funding for local priorities,
organizations, or programs.93

According to an NREL presentation exploring the role of benefits in wind energy development,94 less than half
(205 out of 546) of the examined wind projects included some form of benefit. This aligns with the community
engagement findings in this study; interviewees and public meeting participants anecdotally mentioned
various benefits that project developers offered, although dollar amounts were rarely public knowledge, and
several counties did not know of any substantial assistance. The most common benefit seen was
contributions to local organizations and causes (e.g., volunteer fire departments, food banks, school
programs). There were also funds established, such as grants and scholarships. Several of the most common
types of benefits are discussed in this section.

Lastly, many funds or mitigation payments do not address other concerns about impacts to local culture, ways
of life, or the environment. A Berkeley Law report about community benefit agreements (CBAs) recommends
that they should help create “community-responsive organizations with local governance that lead to long-term
community improvements and a community voice” in project monitoring and management.95


Community benefits agreements/Host community agreements
CBAs are tools that can help local communities have a voice in the development of new projects. CBAs are
legally binding, enforceable contracts signed by project developers and community groups. CBAs can provide
funds for development, support affordable housing, environmental mitigation, infrastructure, priority projects
identified by the community.96 Host community agreements (HCAs) are similar tools with a different name, by




93 WINDExchange. Wind Energy Technologies Office, “Wind Energy Community Benefits Guide” (U.S. Department of Energy Office of

Energy Efficiency and Renewable Energy, 2023), https://windexchange.energy.gov/community-benefits-guide.
94 Matilda Kreider et al., “Benefits and Burdens: Exploring the Role of Community Benefits in Wind Energy Development” (National

Renewable Energy Laboratory,
95 Louise Bedsworth and Katherine Hoff, “Offshore Wind & Community Benefits Agreements in California” (Berkeley Law, Center for

Law, Energy, & the Environment, April 2024).
96 U.S. Department of Energy, Office of Economic Impact and Diversity, “Community Benefits Agreements: Frequently Asked Questions,”

accessed June 12, 2024, https://www.energy.gov/justice/articles/community-benefit-agreement-cba-resource-guide-faqs.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          77
which clean energy project developers negotiate directly with the host community to provide customized
benefits.

While benefits are not currently required by the federal government (or most U.S. states, with New York as a
notable exception — see examples explained later in this section), the U.S. DOE does require Community
Benefits Plans (another similar tool by a different name) for all Bipartisan Infrastructure Law and Inflation
Reduction Act funding opportunity announcements and loan applications.97 Some federal organizations, like
the Bureau of Ocean Energy Management (BOEM), incentivize the use of community benefits by providing a
bidding credit, which was used in the 2023 California offshore wind energy sale, to encourage developers to
form CBAs.98

Payment in lieu of taxes
In general, a payment in lieu of taxes (PILT, also referred to as PILOT or PLOT), is paid to compensate a
government for property tax revenue lost due to tax exempt ownership or use of real property. In the context of
clean energy projects, the developer of clean energy project would financially compensate the hosting
municipality annually as a replacement for a portion of the taxes it would have otherwise paid. These
payments can “replace an irregular set of payments based on depreciating assessed property values with a
more regular set of payments.”99

As previously discussed, Washington recently passed a new exemption on the state portion of personal
property tax for qualifying clean energy facilities, which will come into effect on January 1, 2025. 100 The clean
energy facilities granted this exemption would pay a new “production excise tax” based on the
generation/storage capacity of the facility, the proceeds of which would be distributed to local municipalities,
school districts, and federally recognized tribes in which projects are sited.101 Similar to a PILT, this exemption
and production tax would fund local activities at a stable level year over year, avoiding some of the concerns
around the depreciation of personal property for the period of the exemption.

The federal government will also make PILT payments for counties that host a large portion of tax-exempt
federal land.102 These payments should not be confused with voluntary or required agreements that project
developers make with local jurisdictions. This study does not include an analysis of whether a PILT program is
permissible under Washington law.

Other community benefits
Additional support for communities may include direct investments in infrastructure improvements,
recreational and/or scenic enhancements, and job opportunities. Examples of such benefits identified as part




97 U.S. Department of Energy, “About Community Benefits Plans,” n.d., https://www.energy.gov/infrastructure/about-community-

benefits-plans.
98 Schatz Energy Research Center, “Competitive Offshore Wind Leases on the U.S. Outer Continental Shelf: A Review of the Use of

Multiple-Factor Auctions and Nonmonetary Credits,” n.d., https://schatzcenter.org/pubs/2023-OSW-R1.pdf.
99 Eli Gold, “Solar Energy Property Taxation” (Gerald R. Ford School of Public Policy, University of Michigan, June 2021).
100 Marty Tschida and Shane Griffiths, “New Renewable Energy Property Tax Exemption in Washington State,” Moss Adams, March 11,

2024, https://www.mossadams.com/articles/2024/03/energy-storing-generating-facility-exemption.
101 Stoel Rives LLP, “New Washington State Personal Property Tax Exemption for Certain Renewable Energy Generation and Storage

Facilities,” February 8, 2024, https://www.stoel.com/insights/publications/new-state-personal-property-tax-exemption-for-rene.
102 U.S. Department of the Interior, “Payments in Lieu of Taxes,” n.d.,

https://www.doi.gov/pilt#:~:text=Welcome%20to%20the%20PILT%20Website,Federal%20lands%20within%20their%20boundaries.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                         78
of this analysis via research and public engagement include installing solar panels on the roof of a community
pool, funding to the local school district, and supporting medical facilities and hospitals.


Examples of economic development assistance
Although community benefits are not always public, these examples from the case study analysis provide
insights on how clean energy project developers may choose to invest in the communities where they operate.

Case study projects
The six operating clean energy projects demonstrate a variety of mitigation and assistance measures that
contribute to the local communities. The following list summarizes the initiatives associated with five of these
operating projects:

    •   Horn Rapids Solar, Storage, and Training (4 MW, Constructed 2020)
        This project directly benefits the City of Richland by supplying all generated energy to the local
        community to supplement energy needs and help reduce peak energy demand. The project also
        provides the City of Richland with a variety of demand response and grid services, which are
        particularly useful during peak usage times. According to an analysis from the Pacific Northwest
        National Lab (PNNL), this arrangement has a 25-year present value of $7,386,098 in benefits for
        residents.103 Additionally, the City received a $3 million Clean Energy Fund grant from the Washington
        State Department of Commerce to offset costs of developing the project and test the facility’s
        functions.104 Depending on the modeling assumptions and the inclusion of the grant, PNNL estimates a
        net benefit cost ratio of the Horn Rapids project as negative to slightly positive.
    •   Rattlesnake Flat Wind (144 MW, Constructed 2020)
        Managed by Clearway Energy in partnership with Avista, this project supports local services and
        infrastructure through donations to the Washtucna Heritage Museum and Community Center, the
        Adams County Fire Protection District, and the Lind Senior Center. During the COVID-19 pandemic, it
        also contributed to local food banks. Revenues from land leases on public land fund local government
        services and school construction.105
    •   Skookumchuck Wind (136 MW, Constructed 2020)
        Southern Power Company collaborated with Lewis County's Community Development Office to develop
        the Environmental Impact Statement and development agreement. This development agreement
        ensures that revenue from building permits covers the office's operational costs. Additionally, Southern
        Power contributed to mitigation costs for local fire services.106




103 Kelly Rae and Carla Martinez, “New Energy Project Powers Up in Richland,” Energy Northwest, November 9, 2020,

https://www.energy-northwest.com/whoweare/news-and-info/Pages/New-energy-project-powers-up-in-Richland.aspx.
104 Ma, Wu, and Crawford, “Energy Northwest – Horn Rapids Solar and Storage.”
105 Zadie Oleksiw, “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for

Rattlesnake Flat Wind Farm,” Clearway Energy Group, December 15, 2020, https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm.
106 Personal communication with Lewis County Community Development Office on March 8, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          79
    •    Columbia Solar (15 MW, Constructed 2022)
         While not directly tied to project operations, Puget Sound Energy (PSE) and the PSE Foundation have
         invested over $105,000 in community-based organizations within Kittitas County, including Habitat for
         Humanity and the Kittitas County Historical Museum.107,108
    •    Tucannon Wind (267 MW, Constructed 2014)
         In 2015, Portland General Electric established the Tucannon River Wind Farm Habitat Project Fund,
         which annually allocates up to $20,000 for local conservation projects.109

Additional examples
In addition to mitigation measures described above, which are associated with the case study projects, there
are measures implemented elsewhere that provide examples of what could be applicable to future clean
energy projects in the state. Table 21 at the end of this section summarizes projects that have used these
programs, including the financial details of the support where available.

NYSERDA Build-Ready Program
Build-Ready is a New York State Energy Research and Development Authority (NYSERDA) program that works
with communities to design and develop clean energy projects on under-utilized land (e.g., brownfields,
landfills, former commercial or industrial sites, parking lots) and that are customized to meet local needs.110
After a municipality identifies and nominates a site, NYSERDA works with the host municipalities on permitting,
design, interconnection, and developing a customized benefits package. NYSERDA then auctions the site to
clean energy developers, who are required to comply with the previously agreed upon benefits package.

Since the program’s creation in 2020 and as of December 2023, Build-Ready has resulted in the ongoing
development of 21 projects.111

NYSPSC Host Community Benefit Program
In 2021, the New York State Public Service Commission (NYSPSC) established a host community benefit
program in accordance with the state’s Accelerate Renewable Energy Growth and Community Benefit Act.
Owners of large-scale (over 25 MW) clean energy facilities pay $500/MW for solar or $1,000/MW for wind each
year for the first 10 years of the project’s operation, to be distributed equally among all residential utility
customers residing in the municipality where the facility would be located through electricity bill credits.112
These funds are meant to complement, not replace, other agreed-upon benefits (such as PILOT agreements).




107 “2022 Puget Sound Community Profile: Kittitas County,” n.d.,

https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.pse.com/-/media/PDFs/Community-
profiles/Kittitas.pdf%3Fsc_lang%3Dhi%26modified%3D20230329205914%26hash%3D23D7856FB7B9997F98FEBF1CC1DBF3AF&ved=
2ahUKEwj-u_m15e-FAxVCHjQIHX8kDQAQFnoECBQQAQ&usg=AOvVaw2RzWFVtLdkmOZXVkP02OA-.
108 “2022 Puget Sound Community Profile: Kittitas County.”
109 Blue Mountain Community Foundation, “PGE Tucannon River Wind Farm Habitat Project Fund: Request for Proposal,” accessed April

24, 2024, https://www.bluemountainfoundation.org/grants/grantinfo/.
110 New York State Energy Research & Development Authority, “Build-Ready Program,” NYSERDA, accessed June 12, 2024,

https://www.nyserda.ny.gov/All-Programs/Build-Ready-Program.
111 NYSERDA, “NYSERDA’s Build-Ready Community Benefits Package,” https://www.nyserda.ny.gov/-

/media/Project/Nyserda/Files/Programs/Clean-Energy-Standard/Build-Ready-Community-Benefits-Package---Dec2020.pdf.
112 Thomas F. Puchner, “New York State Public Service Commission Establishes Host Community Benefit Program,” Renewable Energy

Post (blog), February 15, 2021, https://www.renewableenergypost.com/public-service-commission/new-york-state-public-service-
commission-establishes-host-community-benefit-program/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        80
According to a status report submitted in June 2023, there were eight applicable projects on the list in New
York, with developer fees estimated to total $7.8 million over 10 years (this total to be distributed among all
host community residents).113 The same report notes that applicable facilities are not expected to commence
operations until at least 2025, so the estimated economic benefits are prospective in nature.

Oregon’s Strategic Investment Program
Oregon’s Strategic Investment Program (SIP) is a program that offers a 15-year property tax exemption on a
portion of large capital investments by "traded sector" businesses (including clean energy developers).114 If
approved, the SIP project is initially taxed according to project size, with a 3% increase with each year of the
SIP period. Approval for SIP tax treatment starts with negotiation an agreement between the project developer,
the county government, and any other local parties that may be affected (e.g. city, port district), with a public
hearing held by the county’s governing body before executing an agreement. Once all parties agree, the
developer may apply to Business Oregon for the official determination.

The SIP agreements are public, and the Business Oregon website115 provides financial summary tables for over
20 different projects that have used SIP from 2018 to 2024, though the tables do not include information about
how the counties are using the SIP payments.

Solar Energy Zones Regional Mitigation Strategy
In 2017, the U.S. Department of Interior Bureau of Land Management released solar regional mitigation
strategies to ensure equitable development of “Solar Energy Zones” in Colorado, Arizona, and Nevada.116 The
strategy applies a landscape-level approach to managing solar development and mitigation on public lands,
including identification of natural, cultural, and human resources that could be impacted by potential
development, measures to compensate for any unavoidable impacts, and identification of priority of sites for
mitigation. The strategy also recommends a per-acre regional compensatory mitigation fee for solar
development to fund off-site compensatory mitigation measures.

Potential mitigation actions mentioned include:

    •   Perform high density shrubland treatments
    •   Research, identify and protect national historic trail routes
    •   Develop educational and interpretative services
    •   Develop and maintain partnership with local community colleges to encourage solar energy technical
        courses in environmental justice communities

Locally owned, community-scale wind farm in Grayland, Washington
Coastal Energy Project is a locally owned community-scale commercial wind farm (6 MW) built in 2010 in
Grayland, Washington. It is sponsored by the Coastal Community Action Program (CCAP).117 The project’s


113 New York State Department of Public Service, “In the Matter of a Renewable Energy Facility Host Community Benefit Program,” n.d.,

https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=62773.
114 Business Oregon, “Business Oregon : Strategic Investment Program (SIP) : Strategic Investment Program (SIP) : State of Oregon,”

accessed June 12, 2024, https://www.oregon.gov/biz/programs/sip/pages/default.aspx.
115 Business Oregon.
116 U.S. Department of the Interior Bureau of Land Management and Environmental Science Division Argonne National Laboratory,

“Regional Mitigation Strategy for the Colorado Solar Energy Zones,” January 2017,
https://blmsolar.anl.gov/documents/docs/FINAL_CO_SRMS_Jan_2017.pdf.
117 Craft3, “Coastal Energy, Grayland, Washington,” February 21, 2023, https://www.cdfifund.gov/sites/cdfi/files/documents/coastal-

energy_02212013.pdf.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                81
financing came from three sources: a state grant, a commercial loan provided by Craft3 (a Community
Development Financial Institution and Community Development Entity), and government tax incentives.

The project created approximately 50 construction jobs, six new and permanent jobs, and indirectly supported
another 23 full-time equivalent positions. CCAP can sell energy from the six MW project to its local electric
utility and use the earnings (estimated to be around $450,000 annually in 2011) “as an unrestricted source of
funds for its housing, energy assistance, health, and other programs that serve the local community.” 118




118 Katie Kienbaum and John Farrell, “Advantage Local: Why Local Energy Ownership Matters, 2023,” (Institute for Local Self-Reliance,

June 2023).


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              82
Table 21. Clean energy projects supported by economic development programs

Program               Project            Location        Capacity     Direct Economic Benefits                Indirect Economic Benefits

                                                                                                              Developer will pay for water study,
NYSERDA Build-        Mount Morris       Mount Morris,                PILOT and HCA agreements                which will help town apply for grants
                                                       177 MW
Ready Program         Solar Farm         NY                           ($500k/yr)                              & reduce municipal water project
                                                                                                              cost by up to 80%

                                                                                                              Energy from solar farm (equates to
NYSERDA Build-        Homeridae                                       PILOT agreement ($5,000/MW/yr to
                                         Olean, NY       4 MW                                                 $125,000/yr in reduced electricity
Ready Program         Solar Farm                                      host town to reinvest in community)
                                                                                                              costs for city)

NYSPSC Host
                                                                      $125,000/yr distributed among
Community Benefit     Mill Point Solar   Glen, NY        250 MW                                               --
                                                                      residents of town
Program119

Lewis County
                      Number Three                                    $150,000/yr distributed via grants for
Industrial                               Lewis County,
                      Wind Energy                        103.9 MW     projects that benefit the greater      --
Development Agency                       NY
                      Center                                          community and/or local businesses
HCA120

                                                                                                              11 newly created direct jobs with
Oregon Strategic      Hay Canyon &                                    $1.1 million in SIP fees paid in 2023
                                         Sherman         200 MW                                               average $91,971 salary (compared to
Investment            Star Point Wind                                 ($330 million invested by end of
                                         County, OR      (combined)                                           median Sherman County household
Program121, 122       Farms                                           2021)
                                                                                                              income of $57,171 in 2022)

Oregon Strategic                                                                                              4 newly created direct jobs with
                                                                      $1.3 million in SIP fees paid in 2023
Investment            Montague Wind      Gilliam                                                              $111,043 average salary (compared
                                                         200.9 MW     ($265 million invested by end of
           ,          Power Facility     County, OR                                                           to median household income in
Program123 124                                                        2021)
                                                                                                              Gilliam County of $58,409 in 2022)

                                                                                                              Identified natural, cultural, and
                                                                                                              human resources that could be
                                         San Luis
Solar Regional        Solar Energy                                                                            impacted by development, selected
                                         Valley, CO
Mitigation Strategy   Zones (3) in                       N/A          --                                      priority sites for mitigation, and set
                                         and Taos
(U.S. BLM)125         Colorado                                                                                per-acre fee recommendation for
                                         Plateau, NM
                                                                                                              solar development to fund off-site
                                                                                                              compensatory mitigation measures.

                      Coastal Energy                                  $450,000/yr from selling energy to
                      Project                                         local utility; used for funding         Created 50 direct construction jobs
Coastal Community
                      Community-         Grayland, WA    6 MW         “housing, energy assistance, health,    (6 permanent) and 23 indirect full-
Action Program126
                      Scale Wind                                      and other programs that serve the       time jobs
                      Farm                                            local community”




119 New York State Energy Research and Development Authority, NYSERDA Annual Filing Host Community Benefits 2023 (November 1,

2023).
120 WINDExchange. Wind Energy Technologies Office, “Wind Energy Community Benefits Guide.”
121 Business Oregon, “Business Oregon : Strategic Investment Program (SIP) : Strategic Investment Program (SIP): State of Oregon.”
122 U.S. Census Bureau, “Sherman County, OR Census Profile,” n.d.,

https://data.census.gov/profile/Sherman_County,_Oregon?g=050XX00US41055.
123 Business Oregon, “Business Oregon : Strategic Investment Program (SIP) : Strategic Investment Program (SIP): State of Oregon.”
124 U.S. Census Bureau, “Gilliam County, OR Census Profile,” n.d.,

https://data.census.gov/profile/Gilliam_County...?g=050XX00US41021.
125 Bureau of Land Management, “BLM Releases Strategy for Solar Energy Development on Colorado Public Lands,” January 12, 2017.
126 Kienbaum and Farrell, “Advantage Local: Why Local Energy Ownership Matters, 2023.”




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             83
Recommendations
These recommendations emerged from community engagement and the economic and financial analysis
documented in this study.


Recommendation 1: Strengthen local involvement in clean energy
siting/project development processes to ensure that rural
communities are informed and have a meaningful role in the
decision-making process.
Rural communities often feel disconnected from decision-making processes that directly affect their
environment and livelihoods. The state should take proactive steps to enhance outreach and engagement,
ensuring that rural communities are informed and given the opportunity to actively participate in decision-
making processes. This includes integrating county-level input into state-level decisions and ensuring that
overburdened communities have equitable opportunities to influence project outcomes.

The state should:

    •   Enhance outreach and engagement for proposed clean energy projects.

        •   Increase the frequency and accessibility of public meetings in rural communities where clean
            energy projects are proposed. This includes holding meetings at convenient times and locations for
            local residents and providing translation services where needed.
        •   Establish feedback mechanisms, such as public meetings or online surveys, to gather community
            input throughout the siting/project development process, and ensure that feedback is considered in
            decision-making processes.
        •   Develop and distribute clear, accessible information on opportunities for local input throughout the
            project development process, using traditional media, social media, and local community
            organizations to reach a broader audience.
        •   Require developers to demonstrate and communicate how they consider and address community
            input during the process.

    •   Develop and improve community engagement and target outreach in overburdened communities to
        ensure equitable engagement.

        •   Give voice to overburdened communities to ensure they are not disproportionately impacted by
            utility-scale clean energy projects.
        •   Tailor community outreach to the needs of overburdened communities, consistent with guidelines
            described in Community Engagement Values and Guidance Adopted by the Environmental Justice
            Council.127

    •   Strengthen county-level engagement in the EFSEC decision-making process.




127 Environmental Justice Council, “Community Engagement Values and Guidance,” August 25, 2023.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        84
       •   Support Interagency Clean Energy Siting Council efforts to examine local government’s role in
           EFSEC project siting and development decisions and identify opportunities to strengthen rural
           communities’ voice in these decisions.

   •   Provide no-cost technical assistance for community clean energy permitting.

       •   Offer dedicated technical support to counties for navigating the permitting process for community-
           scale clean energy projects. This support should include resources for understanding state
           regulations (including the EFSEC siting process), completing permit applications, and addressing
           community concerns.
       •   Create a centralized resource hub where counties can access best practices, case studies, and
           technical guidelines for clean energy permitting and development.

Recommendation 2: Make efforts to increase rural community
benefits and mitigate potential harms from clean energy projects.
The state and developers should work collaboratively to maximize the benefits of clean energy projects to rural
communities, such as job creation, economic growth, and community development, while mitigating potential
harms, including environmental risks and safety concerns.

The state should:

   •   Strengthen the ability of rural communities to engage in informed discussions about clean energy
       projects, ensuring they can fully understand and participate in decisions that affect their local
       environment and economy.

       •   Collaborate with local organizations to host community conversations that increase fact-based
           understanding of clean energy projects, their potential impacts, and the benefits they can bring.
       •   Provide resources and support to local leaders to help them effectively communicate fact-based
           information about the potential benefits and impacts of clean energy projects.

   •   Support local non-government organizations, nonprofit organizations, and community-based
       organizations with training and education grants and other financial assistance.

       •   Provide grants or other forms of financial assistance to nonprofits and other community-based
           organizations in rural communities to build their capacity for training and education around clean
           energy projects.
       •   Encourage partnerships between local organizations, state agencies, and educational institutions to
           develop and deliver training programs that meet the specific needs of rural communities.

   •   Address fire and emergency response concerns about clean energy projects.

       •   Develop a standardized protocol for assessing and mitigating fire and emergency response risks
           associated with clean energy projects in rural areas, including the supply of necessary equipment
           and resources.
       •   Develop standardized curriculum and offer funding and training for local fire districts on the unique
           risks associated with each wind, solar, battery storage, and small modular nuclear development
           project.

   •   Promote community benefit agreements (CBAs).



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                         85
       •   Encourage the use of CBAs in negotiations between clean energy developers and rural communities
           to ensure that project benefits are shared with local residents. These agreements would include
           provisions for community-specific needs, such as local hiring and infrastructure improvements.
           Agreements between communities and developers should include long-term commitments rather
           than vague promises to local communities.
       •   Facilitate the development of CBAs by providing templates and best practices both developers and
           communities, ensuring that these agreements are fair, transparent, and beneficial to all parties.

   •   Encourage direct investments in job creation in local communities to provide long-term benefits to
       those communities.

       •   Encourage investments (beyond project costs) be direct, evident, and tangible to local communities
           so that residents understand and appreciate the engagement, commitment, and contributions of
           project developers locally.
       •   Ensure that the jobs created through these investments are quality, family-sustaining jobs that offer
           competitive wages, benefits (including health care), and opportunities for advancement.
       •   Address the challenges associated with workforce transitions, particularly for workers displaced
           from fossil fuel industries. Promote strategies that help these workers upskill, such as offering
           retraining programs and supporting the establishment of registered apprenticeships.

   •   Require developers to track and publicly report on the outcomes of their investments in local job
       creation, including the number of jobs created, the duration of employment, and the long-term benefits
       to the community.

Recommendation 3: Safeguard and enhance the quality of life in
rural communities as clean energy projects are developed.
The introduction of large-scale clean energy infrastructure can disrupt local ecosystems, alter landscapes, and
create challenges for nearby residents. The state should seek additional approaches that minimize
environmental and aesthetic impacts and prioritize local residents’ well-being, working with relevant
jurisdictions and building on existing practices.

The state should:

   •   Avoid, minimize, or mitigate environmental and aesthetic impacts.

       •   Use best practices to avoid, minimize, or mitigate disruptions to local ecosystems, water resources,
           and wildlife.
       •   Design projects with community aesthetics in mind, such as maintaining visual buffers or using
           low-impact technologies that preserve the landscape in rural areas.
       •   Demonstrate to rural communities that cleanup and restoration activities at the time of facility
           decommissioning will be fully financed and completed, such as with reclamation bonds.

   •   Support setbacks that buffer and protect adjacent landowners and neighbors.

       •   Establish community-informed setbacks for clean energy projects to ensure adequate distance
           between lands where the development will occur and adjacent properties. These setbacks would be
           designed to minimize visual impact, noise, and other potential disturbances to neighbors.
       •   Develop setback guidelines that consider the specific characteristics of the local landscape, land
           use, and community concerns.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        86
   •   Preserve and enhance community well-being.

       •   Develop programs that ensure clean energy projects contribute to local well-being, such as
           providing funding for community amenities, recreational spaces, or infrastructure improvements.
       •   Address concerns related to noise, light pollution, and other potential disturbances from clean
           energy projects by setting clear guidelines and requiring developers to implement mitigation
           measures.

   •   Support local community and economic resilience.

       •   Encourage development of community-scale clean energy projects that provide direct benefits to
           local residents through energy sovereignty, reduced energy costs, enhanced energy reliability, and
           increased resilience to natural disasters.
       •   Support initiatives that encourage clean energy projects to be compatible with traditional rural
           industries, such as tourism or agriculture.

Recommendation 4: Improve transparency in the planning,
development, and operation of clean energy projects.
Rural communities often feel left out of the loop regarding decisions that affect them. The state should require
developers to maintain clear, accessible, and consistent communication throughout the project lifecycle.

The state should:

   •   Build trust by seeking input during the siting and permitting decision process from local communities,
       representative interests, and tribes. Base decisions on factual records, and carefully document the
       rationale for siting decisions when they override input or recommendations from those entities.

   •   Provide accessible information on project impacts and benefits.

   •   Create and maintain a centralized data site/dashboard where detailed information about clean energy
       projects can be accessed, including updates on construction, job creation, environmental impacts,
       permitting process, economic impacts (e.g., tax revenues), and community benefits.

   •   Ensure that regular project progress reports are communicated to local communities through a variety
       of channels to complement the information available on the centralized data site/dashboard.
       Recognizing that not all residents may have reliable internet access, provide printed copies, use local
       media channels, and distribute progress reports to community leaders, government officials, and tribal
       representatives to share at community meetings.

   •   Offer project-related documents in Spanish and other languages pertinent to affected communities.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                          87
Recommendation 5: Explore an alternative taxation approach for
large clean energy projects.
The long-term depreciation of clean energy projects (consistent with their categorization as personal property)
and the associated reduction in property taxes collected over time is a concern for county officials. Some
county officials articulated that mixing clean energy taxation with other personal property taxation is
confusing. Further, some projects are assessed by counties while others are assessed by the state. County
officials also expressed that not having the expertise at the local level hinders their ability to conduct the
assessment effectively and to address appeals.

The state should:

   •   Consider creating a separate approach for clean energy projects, or a separate category of personal
       property tax specifically designated for energy and/or clean energy projects.
   •   Consider whether personal property tax, which is tied to the assessed value and associated
       depreciation schedule, could be replaced with a more consistent taxation method that would provide
       more certainty over time about revenues.

       •   Any approach would also need to continue to provide latitude to the recipient counties for
           distributing funds to their various taxing districts. A major concern about HB 1756 appears to be
           that the counties would lose control over distribution of affected tax revenues.

   •   Consider central assessment of all utility-scale clean energy projects should they remain taxed as
       personal property under the current approach.

Recommendation 6: Improve communication about sales taxes and
clarify expectations about payback timelines for developer rebates.
County officials expressed concerns that sales tax exemptions provide incentives to bring projects to the state
but then penalize local jurisdictions, which do not control or have input into the state’s rules on exemptions.
These tax exemptions have also brought confusion to local jurisdictions, which lack clarity about the amount
or timing of sales taxes that will need to be returned to the state due to these exemptions.

The state should:

   •   Clearly communicate any agreements about tax exemptions for the projects to counties that will be
       required to return funds.
   •   Clearly communicate to counties the timeline of the sales tax exemption process, including how long
       companies can request a sales tax exemption on qualified purchases, when counties are notified of
       refund requests, and when counties must confirm and send payments.
   •   Consider reducing the length of the statutory period to claim a refund so that counties can have greater
       certainty in future budget planning efforts.

Recommendation 7: Increase transparency of economic and
financial data reporting.
Developers should clearly communicate the intended and actual expenditures, as well as economic and
financial impacts, of their projects on the affected communities using verifiable data. Economic and financial



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                         88
data for clean energy projects have not been made available for projects constructed to date, which makes
outside assessment difficult. Collecting and making such data available would provide real information for
both skeptics and proponents of projects to describe effects.

Specifically, the state or local permitting authority should:

   •   Expand pre-permitting reporting requirements for economic and financial data.

       •   Developers should report the total estimated project investments in the design, permitting, and
           construction phases of projects (project costs) and what portion of those costs will be spent in the
           state and locally.
       •   Developers should be asked to estimate the number of jobs they will provide and over what duration
           during the construction period and the operations period. They should be required to evaluate the
           portion of this labor that will be provided with labor supply within the state or counties affected.

Recommendation 8: Improve documentation of federal and state
incentives.
The state does not appear to require a complete accounting of all forms of financial support that projects
receive. This has led to some skepticism from community members about whether projects are providing
incremental financial benefits to the state.

The state should:

   •   Collect data on financial incentives received by developers for each project, including comprehensive
       public reporting of sales tax exemptions approved by the state each year. For example, such reporting
       should include the project name, applicant, date of application and date of approval, the form of the
       exemption (e.g., through a project labor agreement or community workforce agreement), and
       exemption approval date.
   •   Communicate the availability of production excise tax from HB 1756 and report the recipients and
       duration of personal property tax exemptions.
   •   Expand post-construction reporting requirements. After some period following construction, operators
       should be asked to provide updated data on actual expenditures in the state and locally, including labor
       provided.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                       89
      ©Andrew S./Adobe stock




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   90
Appendix A: Methodology Details
Project Timeline Overview
Table A1. Timeline for the Rural Clean Energy Study and Report
Task                                                                                  Time Frame (2024)

Phase 1 Representative Interest Interviews                                            January - February

Economic and Financial Impacts Assessment                                             January - June

Online Comment                                                                        February-July

Phase 2 Representative Interest Interviews                                            March-June

Community Meetings                                                                    May-June

Drafting, Reviewing, and Finalizing Report                                            July - September

Representative Interests and Commerce Review Draft Report                             August-September

Final Report Submitted to Commerce                                                    October 1


Outreach and Engagement: Interviews, Focus Groups, and Public
Meetings
During the project, the consultant team used a baseline set of questions as a starting point for discussion. The
questions functioned as a general framing tool and are listed below.

General Questions
   1. Please briefly describe your connection to rural communities and energy development in Washington
      State.
   2. From your perspective, what are the greatest benefits and greatest challenges from clean energy
      projects in the communities you serve?
   3. How can the State of Washington increase the benefits and reduce the negative impacts of clean
      energy projects?
   4. What actions can energy developers take to increase the benefits and reduce the negative impacts of
      clean energy projects?
   5. What examples come to mind – both positive and negative – of clean energy project development and
      implementation in rural areas, that can inform future work?

Economic Questions
   1. When you think about the potential economic benefits of clean energy in the communities you serve,
      what would you like to see? (e.g., increased local tax revenue, reducing household energy cost, job
      opportunities, etc.)
   2. What are some of the barriers to achieving these benefits?

Future Engagement Questions
   1. How do you suggest we engage organizations and people in rural communities to get their ideas about
       the benefits and challenges about clean energy development?
   2. What challenges might we run into and how do you suggest we approach them?
   3. As we conduct this study of rural clean energy in Washington, how would you like to be engaged?


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        91
   4. How would you like to give and receive information about this study?
   5. Are there other methods of communication that would be more helpful?

Table A2. Affiliations for all Individual and Focus Group Interviews
Category                            Organization/Individual

                                    EDF Renewables
                                    Mynocarbon
                                    Vaagen Timbers
Agriculture/Ranching/Business
                                    Washington Cattlemen’s Association
                                    Washington Wheat Growers Association
                                    Zero Emissions Northwest

                                    Asotin County
                                    Benton County
                                    Columbia County
                                    Grant County
County Assessors
                                    Kittitas County
                                    Klickitat County
                                    Skagit County
                                    Spokane County

                                    City of Richland
                                    Douglas County
                                    Garfield County
                                    Klickitat County
City/County Government
                                    Lincoln County
                                    Port of Columbia County
                                    Skamania County
                                    Yakima County

                                    Adams County Development Council
                                    Economic Development Alliance of Skagit County
                                    Grant County Economic Development
                                    Okanogan Economic Council
County Organizations
                                    Tri-County Economic Development District
                                    Washington Association of County Officials
                                    Washington State Association of Counties
                                    Yakima Valley Council of Governments

                                    Building and Construction Trades Council
Labor
                                    Washington State Labor Council

                                    Firelands Washington
                                    Klickitat Valley Health
                                    North Olympic Development Council
Local Non-profits                   Okanogan County Community Action Agency
                                    Prosser Economic Development Association
                                    Self-Help Credit Union
                                    Yakima Chapter of the Asian Pacific Islander Coalition

                                    American Farmland Trust
                                    Blue Mountain Action Council
                                    Chelan-Douglas Land Trust
                                    Clean Technology Alliance
                                    Friends of the San Juans
NGOs
                                    Renewable Northwest
                                    Rural Resources
                                    The Lands Council
                                    The Nature Conservancy
                                    Washington State Audubon




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                       92
Category                        Organization/Individual

Other                           United States Department of Agriculture

                                Washington Energy Facility Site Evaluation Council (EFSEC)
State Government
                                Washington State Interagency Siting Council

                                Senator Liz Lovelett
                                Senator Matt Boehnke
                                Representative Alex Ybarra
State Legislature
                                Representative Mary Dye
                                Representative Mark Klicker
                                Representative Alex Ramel

                                Confederated Tribes of the Colville Reservation
                                Confederated Tribes of the Umatilla Indian Reservation
Tribal Nations/Organizations
                                Sovereign Power
                                Yakama Nation

                                Avista
                                Chelan PUD
                                Cowlitz PUD
Utilities                       Jefferson County PUD
                                Puget Sound Energy
                                Washington State Public Utility Districts Association
                                Washington Rural Electric Cooperatives



Table A3. Number of Online Comments Received by County of Origin
County                                              Number of Comments

Klickitat                                           38

Benton                                              27

Whitman                                             16

Grant                                               9

Douglas                                             8

Yakima                                              8

Kittitas                                            6

Franklin                                            5

King                                                3

Chelan                                              2

Lincoln                                             2

Skagit                                              2

Snohomish                                           2

Asotin                                              1

Clallam                                             1



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                       93
County                                                Number of Comments

Clark                                                 1

Columbia                                              1

Garfield                                              1

San Juan                                              1

Spokane                                               1

Total                                                 135



The online comment process included a set of three statements that respondents were asked to react to, on a
scale from “strongly disagree” to “strongly agree”. Responses are summarized below. Not all respondents
answered all statements.

Figure A1. Responses to Statements from Online Comment Process




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                   94
Economic and Financial Methodology
Figure A2. Overview of the Economic and Analysis Process




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   95
Table A4. Outline of Methods and Data Sources for Detailed Economic Analyses
                                                             Additional Qualitative
Name             Analytical Steps (quantitative analysis)                                   Data Sources
                                                             Analytical Steps

                 •   Determined changes to project land
                     use using satellite data and
                     estimated acreage by type
                 •   Analyzed the percent change in land
                     use type due to renewable energy                                       •   EFSEC land use reports as well as
                     development and estimated the                                              project-specific land use
                     value of this land based on                                                consistency reviews
                                                         •       Gathered information
                     agricultural revenues from                                             •   Input from members of affected
                                                                 from county planning
                     production and sales data                                                  communities
                                                                 departments during
                 •   Where land use changed, analyzed                                       •   USDA agricultural land use data
                                                                 interviews and focus
                     changes in value based on changes                                      •   USDA NASS values data
                                                                 groups
Land Use             in acreage and average values                                          •   Recreation usage and values
                                                         •       Discussed land use
                 •   For non-agricultural projects,                                         •   Satellite imagery from the National
                                                                 concerns during public
                     identified state specific rental or                                        Land Cover Database’s Multi-
                                                                 meetings regarding local
                     revenue data per acre (e.g., cash                                          Resolution Land Characteristics
                                                                 experiences with
                     rent from pasture)                                                         Consortium and USDA NASS
                                                                 farmland development
                 •   Where applicable, assessed                                                 Cropland Data Layers
                     recreational permit data to                                            •   Parcels from Washington State
                     determine whether access changed                                           Geospatial Portal
                     following project development.
                     Estimated financial impact using
                     estimates of number of permits
                     issued and the cost of permits

                                                                                            •   Publicly available literature and
                 •   Evaluated the financial implications                                       reports on typical leasing rates
                     of projects on landowners by                                           •   Financial arrangements between
                     comparing an estimate of the                                               property owners and project
                     annual income associated with pre-                                         developers, for example, land sales,
                                                             •   Discussed property
                     project land uses (e.g., agriculture)                                      and lease agreements. The two
Financial                                                        value concerns and
                     with estimates of the annual                                               formal lease documents identified
Returns to                                                       leasing opportunities
                     income generated from renewable                                            were both from the Washington
Property                                                         during public meetings
                     energy lease agreements                                                    Department of Natural Resources
Owners                                                       •   Literature review on
                 •   Where lease documents were                                                 (DNR)
                                                                 property values
                     unavailable, gathered publicly                                         •   Pre-project land use; affected
                     available leasing rates and                                                acreage from EFSEC documents as
                     estimated an applicable range for                                          well as project-specific EFSEC land
                     projects                                                                   use consistency reports
                                                                                            •   USDA NASS agricultural value data

                 •   Gathered pre-and post-project tax                                      •   Property tax data and parcels from
                     collections for all case study                                             counties, local authorities and
                     projects and evaluated the increase                                        Washington State Dept. of Revenue.
                     in tax collections to their counties                                       Parcel data was sourced directly
                     from project development.                                                  from county websites or assessors.
                                                           •     Conducted multiple
                     Specifically evaluated real and                                        •   Property tax rates for the state and
Effects on Local                                                 interviews with county
                     personal property tax data                                                 counties and Washington DOR
Tax Revenues                                                     and state officials
                 •   Modeled and estimated sales tax                                            depreciation guidelines and
and Public                                                 •     Participated in focus
                     data using the JEDI model                                                  schedules
Services                                                         groups and public
                     assumptions on construction costs                                      •   Prior land use based on EFSEC
                                                                 meetings
                     and sales tax rates. Multiplied these                                      documents as well as project-
                     costs by tax rates to estimate state                                       specific land use consistency
                     and county sales tax collections                                           reviews
                     from case study projects. Reviewed                                     •   Washington DOR data and reports
                     and evaluated the impact of                                            •   Sales tax data and rates




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                96
                                                             Additional Qualitative
Name              Analytical Steps (quantitative analysis)                                  Data Sources
                                                             Analytical Steps

                      Washington state sales tax                                            •   Interviews and focus groups with
                      exemptions                                                                county assessors and treasurers
                  •   Gathered school funding data to
                      assess local effort assistance and
                      the impact of projects on school
                      districts
                  •   Calculated the percentage of total
                      county taxes coming from project
                      real, personal and sales tax
                      collections
                  •   For personal property taxes,
                      projected project tax payments for
                      22 years using the State tax
                      depreciation schedule

                                                             •   Reviewed existing
                                                                 literature and gathered
                                                                 information from
                                                                 interviews and public
                  •   Calculated project costs using             meetings
                      either JEDI model defaults (wind       •   Identified challenges      •   Project characteristics from
                      and solar) or cost references              and opportunities              EFSEC/EIA (e.g., type, size)
                      (battery storage)                          associated with            •   Data from developers/local
Job Impacts       •   Used JEDI (wind and solar) or              improving the extent of        permitting agencies, when possible
                      IMPLAN (battery storage) to model          local employment in        •   Jobs and Economic Development
                      job impacts associated with project        renewable energy               Impact Model (JEDI); input-output
                      construction and operation in the          projects                       model (IMPLAN)
                      state of Washington                    •   Compared model
                                                                 estimates against
                                                                 information gathered
                                                                 from existing literature
                                                                 and public outreach


Economic and Financial Interviews
In addition to broader focus groups, group interviews, and public meetings, which are described in the
Methodology: Community Engagement section of the report, the consultant team also conducted targeted
interviews and focus groups with county officials, including assessors, treasurers, building and planning
departments, and economic development specialists. These additional interviews focused on issues related to
county finances and economics associated with renewable energy developments. The questions that structure
the economic and financial interviews included the following topics:

   •   Do you have information about project costs, broken out by phase (e.g., engineering and design,
       construction, operations)?

       •      What type of financial arrangement did the builder have with property owners?
       •      To what extent has actual financial returns differed from expectations?

   •   What type of tax arrangement does the county have with [relevant] project?

       •      Can you share data with us on the local taxes collected to date and the schedule for future tax
              payments expected for this project?

   •   What types of land uses has the project area been used for?



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                             97
    •       Has the developer agreed to provide community services for this project? If so, do you have information
            about the costs of these services?

Each interviewee was asked these general questions, tailored to their expertise and knowledge. While many
interviewees did not have responses about specific data sources, they often directed interviewers towards
additional resources or contacts. Table A5 provides a list of counties that participated in at least one session
(interview or topic-based focus group). In addition to these county officials, IEc reached out to State officials,
including:

    •       Department of Revenue regarding taxation of clean energy projects
    •       Department of Natural Resources regarding clean energy leases on state land
    •       Employment Security Department regarding employment in the clean energy sector

Table A5. Participants by County
County                           Officials

Adams                            Building and Planning Department, Economic Development Director

Asotin                           Assessor

Benton                           Assessor, Treasurer, Planning Manager

Columbia                         Assessor, Treasurer, Economic Development Council

Grant                            Assessor

Kittitas                         Assessor

Klickitat                        Assessor, Planning Official, Economic Development Director

Lewis                            Assessor, Treasurer, Community Development Director

Lincoln                          Planning Department

Skagit                           Assessor

Spokane                          Assessor

Thurston                         Assessor

Yakima                           Planning Official

Whitman                          Assessor


Geographic and Demographic Information
Table A6. USDA Rural Commuting Area Code Definitions
                                                                                                               Designation in this
Code         Code name      Definition
                                                                                                               analysis

1            Metropolitan   Metropolitan area core: primary flow within an urbanized area (UA)                 Urban

2            Metropolitan   Metropolitan area high commuting: primary flow 30% or more to a UA                 Urban

3            Metropolitan   Metropolitan area low commuting: primary flow 10% to 30% to a UA                   Urban

                            Micropolitan area core: primary flow within an urban cluster of 10,000 to 49,999
4            Micropolitan                                                                                      Rural
                            (large UC)

5            Micropolitan   Micropolitan high commuting: primary flow 30% or more to a large UC                Rural




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               98
                                                                                                            Designation in this
Code        Code name      Definition
                                                                                                            analysis

6           Micropolitan   Micropolitan low commuting: primary flow 10% to 30% to a large UC                Rural

                           Small town core: primary flow within an urban cluster of 2,500 to 9,999 (small
7           Small Town                                                                                      Rural
                           UC)

8           Small Town     Small town high commuting: primary flow 30% or more to a small UC                Rural

9           Small Town     Small town low commuting: primary flow 10% to 30% to a small UC                  Rural

10          Small Town     Rural areas: primary flow to a tract outside a UA or UC                          Rural

                           Not coded: Census tract has zero population and no rural-urban identifier
99          Rural                                                                                           Rural
                           information



Table A7. Counties by USDA RUCA Code
County                         Predominant RUCA Code                       Designation in this analysis

Adams                          4                                           Rural

Asotin                         1                                           Urban

Benton                         1                                           Urban

Chelan                         1                                           Urban

Clallam                        4                                           Rural

Clark                          1                                           Urban

Columbia                       7                                           Rural

Cowlitz                        1                                           Urban

Douglas                        1                                           Urban

Ferry                          10                                          Rural

Franklin                       1                                           Urban

Garfield                       10                                          Rural

Grant                          4                                           Rural

Grays Harbor                   4                                           Rural

Island                         4                                           Rural

Jefferson                      10                                          Rural

King                           1                                           Urban

Kitsap                         1                                           Urban

Kittitas                       4                                           Rural

Klickitat                      7                                           Rural

Lewis                          4                                           Rural

Lincoln                        10                                          Rural

Mason                          2                                           Urban

Okanogan                       10                                          Rural



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            99
County                   Predominant RUCA Code           Designation in this analysis

Pacific                  7                               Rural

Pend Oreille             2                               Urban

Pierce                   1                               Urban

San Juan                 10                              Rural

Skagit                   1                               Urban

Skamania                 2                               Urban

Snohomish                1                               Urban

Spokane                  1                               Urban

Stevens                  2                               Urban

Thurston                 1                               Urban

Wahkiakum                10                              Rural

Walla Walla              1                               Urban

Whatcom                  1                               Urban

Whitman                  4                               Rural

Yakima                   1                               Urban



Table A8. Number of BPA Interconnection Requests by County and Technology
                         Battery/   Battery/                                            Battery/
County         Battery                           Hydro   Solar          Winda                        Total
                         Solar      Wind                                                Solar/Wind

Adams          1         1          0            0       4              0               0            6

Benton         4         18         0            0       6              1               0            29

Clark          1         0          0            0       2              0               0            3

Columbia       0         1          0            0       1              0               0            2

Cowlitz        1         0          0            0       0              2               0            3

Douglas        5         3          0            1       3              1               1            14

Franklin       0         0          0            0       2              0               0            2

Garfield       0         0          0            0       0              1               2            3

Grant          2         6          0            0       3              1               0            12

Grays Harbor   0         0          0            0       0              2               0            2

King           1         0          0            0       0              0               0            1

Kittitas       0         0          0            0       0              1               0            1

Klickitat      1         6          0            0       1              3               1            12

Lewis          0         0          1            0       0              0               0            1

Lincoln        0         1          0            0       0              4               0            5

Mason          0         1          0            0       0              1               0            2




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                       100
                                   Battery/        Battery/                                                Battery/
    County         Battery                                         Hydro           Solar           Winda                Total
                                   Solar           Wind                                                    Solar/Wind

    Skagit         0               0               1               0               0               1       0            2

    Snohomish      1               0               0               0               1               0       0            2

    Spokane        0               1               0               0               0               2       0            3

    Thurston       2               0               1               0               0               0       0            3

    Walla Walla    0               0               0               0               1               2       3            6

    Yakima         0               1               0               1               1               0       0            3

    Grand Total    19              39              3               2               25              22      7            117

a
 The BPA Interconnection Queue does not differentiate between on-shore and off-shore wind technologies.
Source: Bonneville Power Administration interconnection queue, accessed Sept. 11, 2024.


Table A9. Total Requested Capacity (MW) from BPA Interconnection Queue by
County and Technology
                                   Battery/        Battery/                                                Battery/
    County         Battery                                         Hydro           Solar           Winda                Total
                                   Solar           Wind                                                    Solar/Wind

    Adams          300             200             0               0               400             0       0            900

    Benton         700             15,900          0               0               1,100           200     0            17,900

    Clark          0               0               0               0               0               0       0            0

    Columbia       0               200             0               0               200             0       0            400

    Cowlitz        100             0               0               0               0               1,100   0            1,200

    Douglas        2,200           1,700           0               500             800             200     1,600        7,000

    Franklin       0               0               0               0               0               0       0            0

    Garfield       0               0               0               0               0               300     2,300        2,600

    Grant          600             2,100           0               0               900             300     0            3,900

    Grays Harbor   0               0               0               0               0               2,000   0            2,000

    King           300             0               0               0               0               0       0            300

    Kittitas       0               0               0               0               0               400     0            400

    Klickitat      1,200           1,900           0               0               500             1,100   400          5,100

    Lewis          0               0               600             0               0               0       0            600

    Lincoln        0               300             0               0               0               1,600   0            1,900

    Mason          0               300             0               0               0               300     0            600

    Skagit         0               0               300             0               0               200     0            500

    Snohomish      0               0               0               0               0               0       0            0

    Spokane        0               300             0               0               0               400     0            700

    Thurston       0               0               600             0               0               0       0            600

    Walla Walla    0               0               0               0               200             500     900          1,600




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           101
                                   Battery/         Battery/                                                      Battery/
    County          Battery                                        Hydro           Solar           Winda                       Total
                                   Solar            Wind                                                          Solar/Wind

    Yakima          0              300              0              600             200             0              0            1,100

    Grand Total     5,400          23,200           1,500          1,100           4,300           8,600          5,200        49,300

a
 The BPA Interconnection Queue does not differentiate between on-shore and off-shore wind technologies.
Source: Bonneville Power Administration interconnection queue, accessed Sept. 11, 2024.


Table A10. Project Community Population Statistics
                                          Census tracts intersected        Census tracts intersected by State of Washington
    Metric
                                          by case study projects a         all in-scope projects

    Population (2022)                     61,671                           100,496                         7,688,549

    10-year population change
                                          +47.8% c                         +58.0%                          +14.1%
    (2012 – 2022)

    Average median household income       $91,806                          $81,968                         $90,325

    Average population identifying as
                                          21.1%                            26.5%                           34.5%
    other than white and non-Hispanic

    Average population with income
                                          7.2%                             9.6%                            9.9%
    below federal poverty level

    Average population with less than
                                          9.9%                             11.7%                           7.9%
    high school diploma or equivalent

    Average population that is
                                          2.8%                             3.7%                            3.2%
    unemployed

    Average population without health
                                          12.0%                            14.3%                           9.2%
    insurance

    Average Population over 65 years
                                          17.7%                            17.3%                           16.0%
    old

    Average Population with low English
                                        5.3%                               6.7%                            7.7%
    proficiency

    Population-weighted average energy
                                       2.2%                                1.7%                            1.5%
    burden b
a The above demographic information pertains to the 22 census tracts represented by the 20 study projects. Statistics were calculated

by dividing the total number of residents meeting the demographic condition by the total number of residents in all census tracts.
Average energy burden was calculated as a population-weighted average of each individual tract’s energy burden.
b Energy burden is defined as the percentage of gross household income spent on energy cost.
c Certain census tract boundaries changed between 2012 and 2022, changing which tracts overlapped projects. Case study projects

where this occurred (2 of 9) were excluded from the calculation of percentage change.
Sources: U.S. Census Bureau. 2022 American Community Survey (ACS). 5-Year Data. https://www.census.gov/data/developers/data-
sets/acs-5year.html. U.S. Census Bureau.; 2012 ACS 5-Year Data. https://www.census.gov/data/developers/data-sets/acs-5year.html;
U.S Department of Energy. Low-Income Affordability Data (LEAD) Tool. Data updated in 2021. https://www.energy.gov/scep/slsc/lead-
tool.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  102
Northwest Solar and Wind Capacity
Table A11. Solar electricity generation capacity (GW) in the Northwest on the path to
net-zero emissions
State                                  2021                           2050                         Change 2021-2050

Idaho                                  0.4                            9.5                          9.1

Montana                                0.0                            4.6                          4.6

Oregon                                 1.1                            16.4                         15.2

Washington                             0.5                            15.3                         14.9

Source: Net-Zero Northwest Energy Pathways, June 2023. https://www.nznw.org/energy

Table A12. Wind electricity generation capacity (GW) in the Northwest on the path to
net-zero emissions
State                                  2021                           2050                         Change 2021-2050

Idaho                                  1.0                            12.3                         11.3

Montana                                0.9                            56.1                         55.3

Oregon                                 3.8                            14.0                         10.3

Washington                             3.4                            10.4                         7.1

Source: Net-Zero Northwest Energy Pathways, June 2023. https://www.nznw.org/energy


Property Value Impacts
Table A13. Property Values Impacts Literature Review Summary

Wind
Author(s)          Year    Title                           Journal            Scope of Analysis Property Value Effects

                           The Economic Impacts of a
                           Proposed Wind Power Plant in                       Kittitas County,
ECONorthwest       2002                                    Wind Engineering                      No significant impact
                           Kittitas County, Washington                        Washington
                           State, USA

                           Wind farm announcements
                                                           Journal of
                           and rural home prices:                             Rural Northern
Laposa             2010                                    Sustainable Real                      No significant impact
                           Maxwell ranch and rural                            Colorado
                                                           Estate
                           Northern Colorado

                           Spatial Hedonic Analysis of
                                                           Journal of Real
                           the Effects of US Wind Energy
Hoen               2013                                    Estate Finance     United States      No significant impact
                           Facilities on Surrounding
                                                           and Economics
                           Property Values

                                                           Journal of
                           The On-Farm and Near-Farm
                                                           Agricultural and                      No significant impact on nearby
Sampson            2020    Effects of Wind Turbines on                        Kansas
                                                           Resource                              agricultural lands
                           Agricultural Land Values
                                                           Economics




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       103
Author(s)         Year     Title                              Journal             Scope of Analysis Property Value Effects

                           Values in the Wind: A Hedonic
                                                                                                       6.2% - 15.8% for 0.5-1.0 mi; 8.8-
Heintzelman       2012     Analysis of Wind Power             Land Economics      New York
                                                                                                       21.6% for 0.1-0.5 mi
                           Facilities

                           Wind Farm Proximity and
                                                              Illinois State                           Prices drop 21.63% post-
                           Property Values: A Pooled
                                                              University                               announcement, but return to
Hinman            2010     Hedonic Regression Analysis                            Central Illinois
                                                              Department of                            pre-announcement levels after
                           of Property Values in Central
                                                              Economics                                operation begins
                           Illinois

                                                              University of
                                                              Rhode Island
                           Effects of Wind Turbines on        Environmental                            No significant impact,
Lang and Opaluch 2013      Property Values in Rhode           and Natural         Rhode Island         maximum 5.6% decrease (90%
                           Island                             Resource                                 confidence)
                                                              Economics
                                                              Department


Solar
Author(s)         Year      Title                            Journal               Scope of Analysis Property Value Effects


                            House of the rising sun: The
                                                             Energy                Urban and rural
Gaur              2023      effect of utility-scale solar                                              1.5% - 3.6% within 0.6 mi
                                                             Economics             New England
                            arrays on housing prices

                            Shedding light on large-scale
                            solar impacts: An analysis of
                                                                                                       1.5% decrease for 0-0.5 mi;
Elmallah          2023      property values and proximity Energy Policy            United States
                                                                                                       0.8% for 0.5-1.0 mi
                            to photovoltaics across six
                            U.S. states

                                                             University of
                            An Exploration of Property-                                                5.4% decrease within 1 mile; no
                                                             Texas at Austin
Al-Hamoodah       2018      Value Impacts Near Utility-                                                significant impact beyond 1
                                                             LBJ School of
                            Scale Solar Installations                                                  mile
                                                             Public Affairs


Data Limitations and Uncertainties
Many of these analyses rely on publicly available best estimates. Table A14 provides a summary of potential
data limitations and uncertainty.

Table A14. Data Limitations and Uncertainties
Topic          Assumption/Source of Uncertainty                          Direction and Significance of Potential Uncertainty

               Uncertain project details for forecasted projects.
               Projects that have not yet been constructed may not
               have some information identified or finalized, such       Uncertain. As these projects develop, these details may
Geographic     as project location, capacity, or area. In these cases,   change; this may change project data and cause
Distribution   we utilized the most detailed information available       overestimates/underestimates of impacts to relevant
               or described the potential range of locations under       communities.
               consideration (based on publicly available sources
               and/or representative interest interviews).

               Uncertain or unconfirmed leasing rates for multiple       Uncertain. May overestimate or underestimate financial
Financial
               projects reviewed. The analysis relies on a set of        returns to property owners. There will be moderate variation
Returns
               information provided from public sources or shared        from stated lease rates for specific projects and regions given



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               104
Topic         Assumption/Source of Uncertainty                         Direction and Significance of Potential Uncertainty

              during outreach in combination with leases for case      the unique nature project lease agreements. One county
              study projects when available. Many projects had         assessor stated that lease rates appeared low. This analysis
              confidential leasing terms. Developers and               provides ranges to capture this uncertainty.
              landowners in many cases are not inclined or
              allowed to provide specific information about
              leasing rates.

              Property values are represented by assessed parcel
                                                                       Likely understates impact. Market value is typically higher
              value, not market value. Though assessed parcel
Financial                                                              than assessed value. Market value is more likely to be
              value is supposed to reflect changes in the market
Returns                                                                influenced by other factors such as recent sales, nearby
              value of a parcel, this is not always a perfect
                                                                       construction, and market conditions.
              reflection.

                                                                       Uncertain. Satellite estimates of land use represent areas in
              Analysis relies on satellite imagery. This imagery is
                                                                       binary pixels; thus, even if a crop takes up a portion of a pixel,
              not a precise reflection of what is occurring at
Land Use                                                               it might not be considered in analysis. The opposite is also
              ground level and may not perfectly estimate
                                                                       true; if a crop takes up the majority but not all of a pixel, the
              acreage.
                                                                       area is assumed to be 100% that crop.

              Crops that accounted for negligible crop acreage
              were excluded from the values analysis. This is due      Underestimates impact. The total crop revenues for each
              to the uncertainty of the satellite and USDA             project are lower than they would be if the revenue from these
Land Use
              Cropscape analysis and the possibility that these        crops were included, however given the low acreage the
              very minor acreage totals are inaccurate or              impact be minor.
              incorrect.

              Analysis does not include a comprehensive
              database of tax assessments for all renewable
              energy projects. This analysis relies on a case study    Likely underestimates impact for some counties. This
Tax Impacts
              approach to evaluate a subset of projects, and thus      analysis does not include each and every project
              counties, in the state. There are additional projects
              that have not been

              Project costs are uncertain. We were unable to
              acquire reliable and confirmed project cost
              information from publicly available sources and
              outreach with both county officials and project
                                                                       Uncertain. May overestimate or underestimate job impacts
              developers. There is additional cost uncertainty for
                                                                       and regional economic impacts on rural communities,
Job Impacts   planned projects given potential variability in system
                                                                       depending on the magnitude and distribution of actual
              size and geographic scope. This analysis relies on a
                                                                       investments.
              set of assumptions to model direct investments for
              each case study project. This also affects local
              employment impacts, which are modelled based on
              project costs.

              Analysis is performed at the state level. The JEDI
                                                                       Uncertain. Modelled results reflect job impacts and economic
              models for solar PV and onshore wind do not
                                                                       contributions throughout Washington State. The nature of
Job Impacts   contain default demand multipliers and industry
                                                                       how the impacts are distributed across project counties is
              margins for sub-state geographic scales (e.g.,
                                                                       uncertain.
              county, census tract).

              Analysis does not consider O&M impacts for
              battery energy storage system (BESS) components.         Likely underestimates impact. This analysis does not capture
              While the solar PV and onshore wind JEDI models          O&M impacts associated with BESS components. However,
Job Impacts
              have the capability to model O&M impacts, IMPLAN         from our outreach with county officials, we expect there to be
              does not have the same functionality. There is           a small number of jobs associated with BESS O&M.
              currently no available BESS JEDI model.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                105
Appendix B: Economic and Financial Case Studies
The following sections provide the full case studies for nine projects that were developed as part of the
economic and financial analyses. The projects are listed below and are also bolded in Table 3 in the body of
the main report. Criteria for including a project in the case study approach are detailed in Table 2 in the body of
the main report.

   •   Columbia Solar
   •   Rattlesnake Flat Wind
   •   Skookumchuck Wind
   •   Lund Hill Solar
   •   Horn Rapids Solar, Storage & Training Facility
   •   Tucannon River Wind
   •   Three planned projects:

       •   Carriger Solar
       •   Horse Heaven Clean Energy Center
       •   Desert Claim Wind




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                         106
Case Study: Columbia Solar Project




Photo: Courtesy of Greenbacker

                                                   Nameplate      Years of
Type of Project    Location        Current Owner                                    Size            Facilities
                                                   Capacity       Operation

Solar energy       Kittitas                                                         100 fenced      Three solar arrays of
and storage        County,         Greenbacker     15 MW          2022–present      acres on 14     approximately 20,000 panels
facility           Washington                                                       land parcels    each, two generation tie lines


Project Summary
Columbia Solar Project is a 15-megawatt (MW) capacity solar energy facility in Kittitas County, Washington.
The project was originally developed as five separate sites, of which three sites were constructed. Urtica,
Camas, and Penstemon began operation in 2022 and are the subject of this case study.128 TUUSSO Energy,
LLC, the original project owner, transferred its related project companies (Penstemon, LLC; Camas, LLC; Urtica,
LLC) to Citrine Solar LLC, a subsidiary of Greenbacker Renewable Energy Corporation in February 2022.129
The power generated by the solar panels is delivered by Puget Sound Energy Inc. (PSE), operating under a 15-




128 Typha and Fumaria were terminated in July of 2021. "Columbia Solar." Washington Energy Facility Site Evaluation Council.

https://www.efsec.wa.gov/energy-facilities/columbia-solar
129 Columbia Solar SCA Amendment Presentation on August 17, 2021.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               107
year power purchase agreement with Greenbacker.130 PSE distributes energy to several counties in Western
Washington, including Kittitas County.131

The project lease area contains approximately 100 acres. As Figure B1 shows, the project lease area
intersects 14 land parcels.

Figure B1. Columbia Solar Project in Kittitas County, WA (Washington State
Geospatial Portal,132 Columbia Solar Application for Site Certification133)




130 “Wash. Governor to decide on 25-MW solar project”, S&P Global. August 27, 2018. Accessed on April 25, 2024 at

https://www.spglobal.com/marketintelligence/en/news-insights/trending/6wy9gwbityim4pxxghbhew2.
131 “PSE Locations”, Puget Sound Energy. Accessed on April 25, 2024 at https://www.pse.com/en/Customer-Service/pse-locations-2.
132 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at https://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.
133 “Columbia Solar Projects: Washington Energy Facility Site Evaluation Council Application For Site Certification”, TUSSO Energy, LLC.

January 26, 2018.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              108
Geographic Location/Community Context
Kittitas County has a population of 45,189 as of 2022. 134 The Urtica site is located about one mile south of
Ellensburg; the Camas and Penstemon sites are located about two and three miles southeast of Ellensburg,
respectively.

Ellensburg is the county seat and has a population of 18,703 as of 2022.135 The county’s largest city, Yakima, is
about 25 miles south of the three projects. The County government employs 331 full time and 27 part-time
individuals and has an annual budget of $141.3 million as of 2022.136,137

Table B1 summarizes community population statistics for the project area. As shown in Table B1, while the
population in Kittitas County is like the State for a number of characteristics, Kittitas County has a higher
population living below poverty and a higher energy burden than the state population overall. Columbia Solar is
one of two operating utility-scale clean energy projects in Kittitas County. Wild Horse is a wind farm
constructed in 2006 with a total capacity of 274 MW.138 There are also multiple planned projects and a second
project known as the Desert Claim Wind Project, a 100-MW farm that has been permitted but has not yet begun
construction.139

Table B1. Community population statistics for Columbia Solar Project Area (2018 -
2022).
                                          Census tracts intersected by
Metric                                                                     Kittitas County              State of Washington
                                          project a

Population (2022)                         4,889                            44,424                       7,688,549

10-Year Population Change (2012 –
                                          +6.1%                            +8.5%                        +14.1%
2022)

Median Household Income                   $85,625                          $66,800                      $90,325

Population identifying as other than
                                          15.3%                            19.4%                        34.5%
white and non-Hispanic

Population with income below federal
                                          6.9%                             14.5%                        9.9%
poverty level

Population with less than high school
                                          9.8%                             6.9%                         7.9%
diploma or equivalent

Population that is unemployed             1.8%                             3.7%                         3.2%

Population without health insurance       6.0%                             7.5%                         9.2%

Population over 65 years old              20.6%                            16.8%                        16.0%




134 2022 ACS 5-Year Survey, U.S. Census Bureau.
135 2022 ACS 5-Year Survey, U.S. Census Bureau.
136 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
137 2022 Annual Budget, Kittitas County.
138 “Wild Horse Wind Power Project”, Energy Facility Site Evaluation Council. Accessed on April 25, 2024 at

https://www.efsec.wa.gov/energy-facilities/wild-horse-wind-power-project.
139 “Desert Claim”, Energy Facility Site Evaluation Council. Accessed on April 25, 2024 at https://www.efsec.wa.gov/energy-

facilities/desert-claim.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        109
                                          Census tracts intersected by
Metric                                                                   Kittitas County              State of Washington
                                          project a

Population with low English proficiency 2.5%                             1.2%                         7.7%

Energy burden b                           2.4%                           2.4%                         1.5%
za The project intersects Census Tract 9757.
b Energy burden is defined as the percentage of gross household income spent on energy cost.

Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.140



As shown in Figure B2, approximately 93.0 percent of Kittitas County is publicly owned, including
approximately 63.8 percent federal, 28.8 percent state, and less than one percent county or locally owned
lands.141 Agriculture is one of the primary economic activities in this county; in particular, timothy hay is a
major cash crop and is grown primarily for export to Japan and other Pacific Rim countries. Central
Washington University, located in Ellensburg, is the county’s largest employer.142




140 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.
141 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
142 “Kittitas County Profile”, Washington State Employment Security Department. July 2022. Accessed on April 25, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/kittitas.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          110
Figure B2. Land ownership in Kittitas County, Washington.143




143 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B .


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          111
Land Use
Figure B3. Land use surrounding panels in Columbia Solar Project area (Google Earth,
2023).




THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Columbia Solar
Project on land uses within the project lease area and discuss the likelihood of other potential effects on
nearby land uses.

In 2016, land in the project footprint was used primarily for crop agriculture, with 96.8 percent of the area
farmed.144 As shown in Table B2, following project implementation, data indicates that all crop acres have
been converted to solar development.145 Figure B3 shows the absence of agricultural land use within the
project footprint146 in one portion of the Columbia Solar Project area in 2023. NASS data from 2016 suggests
that most of the crops grown in the footprint pre-project were dry beans, alfalfa, and other non-alfalfa hay.147 At
average 2023 crop values, the value of the crops in the project area pre-installation (97 crop acres) were


144 2016 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on May 5, 2024 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
145 2023 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on May 5, 2024 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
146 The project footprint is defined as including parcels on which panels are located.
147 Our analysis of crop value does not include revenue generated from apples, which are grown in 0.18 acres of the project footprint

and account for less than one percent of the total crop acreage, due to the lack of relevant data in the 2023 Washington State-level
USDA and NASS data set we rely on.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              112
approximately $81,766 annually,148 or an average of $844 per acre in farm revenues.149 Net farm income
would be a fraction of these total revenues. USDA 2022 data suggests that net revenues for Washington farms
were approximately 18 percent of gross receipts, which would equate to net farm income of approximately
$152 per acre at current crop prices.150

Table B2. Cropland acres within project footprint before (2019) and after project
(2022) construction.

Project Footprint                     Pre-project, 2019                               Post-Project, 2023
(Area within fenceline)               (Acres, percent of total)                       (Acres, percent of total)

Crops                                 96.8 (97.4%)                                    0.0 (0%)

Developed                             0.5 (0.5%)                                      99.5 (100%)

Other                                 2.1 (2.1%)                                      0.0 (0%)

Total                                 99.5 (100%)                                     99.5 (100%)

Source: 2019, 2023 Cropland Data151


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates what we can
determine about the effects of Columbia Solar Project on landowners in Kittitas County.

As is common practice with solar energy project development in rural areas, land parcels in the Columbia Solar
Project area are owned by a separate entity and leased to the developer. All parcels within the footprint are
owned by either Valley Land Company, LLC or the Snowden family. The Valley Land Company was established
in 2009 and bought most of the parcels in the project area in 2010, with some parcels purchased as late as
2018. The remaining parcels have been owned by the Snowden family since at least 2017.152




148 The total value of this cropland was determined by using satellite imagery to approximate the acreage of each crop in the area; then,

each crop was multiplied by its reported value. These values were summed to find the total approximate value of this cropland. For dry
beans, the value per harvested acre was estimated by taking the average of chickpeas, dry peas, and lentils, which are the categories of
dry beans present in the data set.
149 United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS). 2023 Washington State

Agriculture Overview. Accessed on March 6, 2024 at
https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.
150 United States Department of Agriculture (USDA) Farm sector financial indicators, Gross farm receipts and net farm income for the

State of Washington, 2022. Accessed at
https://data.ers.usda.gov/reports.aspx?ID=17839#P497d065d34af4dde8a5dd22d58d70ae9_3_185iT0R0x0 May 31, 2024.
151 2019, 2023 Cropland Data Layer. United States Department of Agriculture (USDA) National Agricultural Statistics Service (NASS).

Accessed June 22, 2023 at https://datagateway.nrcs.usda.gov/.
152 Kittitas County TaxSifter. Accessed on April 30, 2024 at https://taxsifter.co.kittitas.wa.us/Search/Results.aspx.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               113
Property owners within leased areas typically enter into lease agreements with the project owners for a pre-
development period (typically ranging from two to five years in duration). After the design of the project is
established, landowners of parcels on which physical infrastructure is developed are further compensated on a
per acre basis at an established fee. While these agreements are generally confidential to the parties engaged,
and while agreements made with some public entities are sometimes public, all of the leased areas for this
project are owned by private parties and as a result, no such agreements are publicly available.

Average lease rates provided through public sources range from approximately $200 to $1,000 per acre for
leases in this area.153 At these leasing rates, annual lease payments to landowners would range from
approximately $20,000 to $100,000 for the 100 acres once the project is fully operational. This is likely to be in
addition to one-time payments to landowners (i.e., signing bonuses) as well as smaller pre-development
payments (e.g., 10 percent of the operational rent).

The project areas are marked by fences which enclose all panels and other project-related structures. Because
of this physical barrier, parcels in these areas can no longer be used for activities such as farming or rangeland
as they were prior to project implementation.

Given estimated net crop farm income of approximately $152 per acre, lease payments of $200 to $1000 per
acre would exceed typical crop income, with a net increase of approximately $58 to $858 per acre. Across the
100-acre project, net payments to landowners could range from $5,000 to $85,000 annually, depending on
lease terms and site-specifics.

The change in land use for areas within the fence line would also require changes to the zoning and taxation
designation for the parcels since they are no longer active for agriculture. Under Washington’s Current Use
taxation laws, landowners receive a tax break for using land for agricultural purposes as long as compatible
incidental uses (including solar panels) do not exceed 20 percent of the classified land.154 As a result of the
development of the project, parcels in the project footprint with panels have not been able to maintain this
designation and are thus would be charged a penalty fee including 20 percent of the property value plus seven
years of back taxes.155 These one-time payments were made in 2021 and ranged from $87 to $21,000 per
parcel based on value and tax history. The developer is likely to pay for this current use designation tax as well
as other property taxes to avoid additional costs for the landowners.




153 While it is difficult to directly compare leases given the variety of factors likely considered in individual agreements, publicly

available estimates provide similar annual values. BLM rents range from $18.61 per acre up to $62,000 per acre depending on the zone
with a median of $400 per acre in zone 8. Kittitas is zone 6 where the rent is $211 per acre in 2023 from BLM
(https://www.blm.gov/sites/default/files/policies/IM2021-005_att5.pdf, https://www.blm.gov/sites/default/files/policies/IM2021-
005_att1_0.pdf). The Strategic Solar Group lists a broad range of $300 to $2,000 per acre as a standard range, noting that a variety of
factors, including proximity to a substation influence the leasing rate (https://strategicsolargroup.com/what-is-the-average-solar-farm-
lease-rate/). They note that in California’s Central Valley leases are typically around $1,000 per acre. Based on these rates, we use a
range of $200 to $1,000 for the estimate of returns for landowners.
154 “Do You Qualify For Reduced Property Taxes? Current Use Taxation”, WSU Extension Clark County, 2014. Accessed on May 30, 2024

at https://s3.wp.wsu.edu/uploads/sites/2079/2014/04/current-use-15.pdf.
155 “Do You Qualify For Reduced Property Taxes? Current Use Taxation”, WSU Extension Clark County, 2014. Accessed on May 30, 2024

at https://s3.wp.wsu.edu/uploads/sites/2079/2014/04/current-use-15.pdf




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                   114
Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Since construction, Columbia Solar taxes have been assessed by Kittitas County, as the project footprint is
entirely within Kittitas County.156 The three distinct sites are all assessed individually. The assessed value of
the project-associated personal property was $18.2 million in 2023.

Taxes are paid by the project owner, Greenbacker. Personal property tax payments initiated post-construction
at $134,326 in 2022 and $145,622 in 2023. Because the infrastructure is anticipated to depreciate over time,
the personal property tax payments made to the county will decline over time. Although improvements to the
project may alter the schedule, the depreciation is anticipated to decline at a rate that is approximately
consistent with the published state schedule of four percent for utility-scale renewable energy development.157
Based on this schedule, the project would depreciate to 50 percent ($9.1 million) of its original value by Year
12 and to 15 percent ($2.7 million) by Year 22, where it would be constant for the remaining life of the project.
This reduction in assessed value would result in proportional reductions of personal property tax payments
(e.g., to approximately $22,000 in Year 22) using the current tax levies and valuation guidelines.

The annual real property taxes on the leased parcels are likely to paid by the developer as a part of the contract
between the developer and the landowners of leased parcels. As shown in Table B3, real property tax
payments from the project parcels increased from 2019 through the present with a notable jump in payments
in 2021. This increase in 2021 was associated with “compensation” payments made for each parcel due to the
change in land use designation described above. The 2021 compensation payments comprised the majority
($82,500 of the $89,818) paid in real property taxes to the county in 2021. This change in classification is also
likely the cause of the observed increase in real property value and associated taxes in most recent years.

The sale of machinery and equipment for the Columbia Solar also generated sales tax revenue for both the
state and county. Kittitas County had a 1.6 percent sales tax rate in 2022. Combined with the state’s 6.5
percent tax rate, the overall sales tax levy was 8.1 percent in 2022. As such, the sales tax on materials and
equipment for the project are estimated to have generated approximately $800,000 (2023 USD) in total state
and county sales tax (based on a total sales figure of approximately $10 million).158 However, because there
is a 75 percent state exemption for sales tax for renewable energy projects, projects may submit receipts to
the state for reimbursement.159 This means that after initially paying the sales taxes, the state and county will



156 Personal communication with Washington State Department of Revenue on March 25, 2024.
157 Personal Property Valuation Guidelines, Washington State department of Revenue. Accessible at: https://dor.wa.gov/taxes-

rates/property-tax/personal-property-valuation-guidelines
158 IEc analysis. We assume qualified expenditures that would generate sales taxes include material and equipment cost categories

specified in the solar photovoltaic JEDI model. Costs for each category are estimated by first taking the product of the project’s rated
capacity (15 MW) and the solar photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) in the State
of Washington, then by distributing the estimate by the default proportions of total costs for each cost category.
159 The sales tax exemption was modified in 2019 to allow for a refund of 50%, 75%, or 100% of the state and local sales tax paid on

machinery, equipment, and labor and services related to the installation of certain renewable energy systems purchased or installed
after January 1, 2020. Depending on the source of their involved workforce, project owners may qualify for one of the three available
tiers of this exemption. Due to data limitations, we are unable to allocate total sales tax collections to individual refund tiers and
assume 75% of local sales tax paid on qualified expenditures are refunded to project owners.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              115
return revenues to the projects. In this case, final sales tax payments are likely to have been closer to
$160,000, of which approximately $40,000 were retained by the County.160 The project will continue to generate
sales tax revenue on a periodic basis, whenever project machinery or equipment is replaced or refurbished.

Table B3. Columbia Solar project tax payments to Kittitas County, 2019 – 2023.
                           Estimated
           Real                                                                        Total Project    Total County
                           Personal         Total Project       Total County Tax                                          % of County
 Year      Property                                                                    Collections      Taxes Collected
                           Property         Collections         Collected                                                 Tax Roll
           Tax                                                                         (2023 dollars)   (2023 dollars)
                           Tax*

 2019      $2,330          $0               $2,330              $76,852,547            $2,777           $91,595,868       <0.01%

 2020      $2,269          $0               $2,269              $85,629,443            $2,672           $100,812,803      <0.01%

 2021      $89,818         $0               $89,818             $90,204,092            $100,999         $101,433,248      0.09%

 2022      $9,365          $139,855         $149,220            $101,189,440           $155,363         $105,354,854      0.14%

 2023      $9,799          $145,672         $155,471            $106,188,898           $155,471         $106,188,898      0.15%

 Total     $113,581        $285,528         $399,109            $460,064,420           $417,282         $505,385,671      0.08%

*14 parcels are assigned to Columbia Solar.
Sources: Kittitas County Assessor’s Report,161 Washington DOR Property Tax Statistics (2019-2023).162


Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have
gathered about the extent of impacts that project construction and operations have had on employment in
Kittitas County.

Direct Investments
We estimate total Columbia Solar Project costs using the Jobs and Economic Development Impact (JEDI)
input-output model built by NREL for solar photovoltaic energy development. For this estimate, we use the
model assumption that solar photovoltaic energy project installation and capital expenditure costs are $1,030
per kW in the State of Washington. Similarly, we assume that project operation and maintenance (O&M) costs
are $20 per kW of installed capacity. Using these assumptions, we estimate total Columbia Solar Project
construction and installation costs to be approximately $15.5 million (2023 USD) across all three individual
sites. Annual O&M costs are estimated to be approximately $300,000 (2023 USD).163




160 The timing of the repayment of the county taxes has been highlighted as difficult for County Assessors to anticipate, particularly as

the value of project sales are not specifically reported to the counties.
161 “Kittitas County Assessor’s Report”, Kittitas County Assessor Mike Hougardy, 2023. Accessed on May 30, 2024 at

https://www.co.kittitas.wa.us/uploads/assessor/reports/2023%20Assessed%20Valuations%20Levies%20and%20Taxes%20to%20be%
20Collected%202024.pdf.
162 Washington State Department of Revenue Property Tax Statistics, 2019-2023. Accessed March 2024.
163 SWCA Environmental Consultants (2018) estimated the cost of each proposed Columbia Solar project to cost between $8 and $10

million. The greatest share of this cost estimate in project construction costs would be from the purchase of the solar panels, steel
piles, tracker crossbeams/rails, inverters, transformers, switchgear, and above- and below-ground conductors. However, these
estimates were drawn during a time during the project design phase when there were still five total proposed projects, which were
eventually reduced to three projects. SWCA Environmental Consultants. 2018. Columbia Solar Projects Washington EFSEC Revised
Application for Site Certification. EFSEC Docket Number EF-170823. Prepared for Tusso Energy, LLC.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  116
Employment
Table B4 presents occupations of residents within the project lease area census tract, Kittitas County, and the
State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are somewhat higher in the relevant census tract (12 percent)
when compared to Kittitas County (9.7 percent) or the Washington State average (9.4 percent).

Table B4. Occupation of residents on and near the Columbia Solar Project, 2018 -
2022.
                                                      Employment in Census           Employment in Kittitas         Employment in State of
 Occupation                                           tracts intersected by          County                         Washington
                                                      project* (% of total)          (% of total)                   (% of total)

 Management/Business/Science/Arts                     1,080 (44.4%)                  8,300 (37.6%)                  1,664,322 (44.4%)

 Sales/Office                                         435 (17.9%)                    4,416 (20.0%)                  697,384 (18.6%)

 Service                                              447 (18.4%)                    5,013 (22.7%)                  595,994 (15.9%)

 Production/Transportation/Material Moving            187 (7.7%)                     2,214 (10.0%)                  443,300 (11.8%)

 Natural Resources/
                                                      286 (11.7%)                    2,146 (9.7%)                   351,076 (9.4%)
 Construction/Maintenance

 Total                                                2,435 (100%)                   22,089 (100%)                  3,752,076 (100%)

*The project intersects Census Tract 9502.
Source: 2022 ACS 5-Year Survey.

We developed a modeled estimate of job effects of the project using JEDI to evaluate the impacts of the
project on the Washington State economy (Tables B5 and B6). The JEDI model estimates the direct, as well as
the indirect (supplier) and induced (consumer spending) effects associated with project expenditures. Table
B5 presents the estimate for the Columbia Solar project for the construction phase. As shown, we estimate
that project construction may have resulted in 68 full-time equivalent (FTE) jobs and contributed $4.6 million
(2023 USD) to the State of Washington. As shown in Table B6, we also estimate annual O&M spending to be
associated with four jobs (FTE) and $410,000 (2023 USD) in sales contributions to the State of Washington.

Table B5. Regional economic impacts of the Columbia Solar Project in Washington,
Construction Phase

 Economic             Estimated Project Costs                   Jobs (Full-time
                                                                                         Earnings (2023 USD)            Output (2023 USD)
 Impact               (2023 USD)                                equivalents)

 Total                $15,450,000                               68                       $4,600,000                     $9,500,000

Source: IEC analysis. Project costs are estimated by taking the product of the project’s rated capacity (15 MW) and the solar photovoltaic JEDI model’s
default average cost value of $1,030 per kW (including sales tax) for the State of Washington. Impacts include direct, indirect, and induced effects of
construction spending, which are assumed to include spending on labor, materials, equipment, permitting, and taxes. Materials and equipment costs are
assumed not to be spent locally. Estimated project costs include both in-state and out-of-state expenditures. The JEDI model is run at the state-level,
meaning any local expenditures and job estimates are associated with in-state impacts and not impacts at finer spatial scales (e.g., county,
municipality). FTEs have a duration of one year.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                            117
Table B6. Regional economic impacts of the Columbia Solar Project in Washington,
O&M phase, Annual
                          Operation and
 Economic                                        Jobs (Full-time
                          Maintenance                                          Earnings (2023 USD)                 Output (2023 USD)
 Impact                                          equivalents)
                          Costs (2023 USD)

 Total                    $300,000               4                             $230,000                            $410,000

Source: IEC analysis. O&M costs are estimated by taking the product of the project’s rated capacity (15 MW) and the solar photovoltaic JEDI model’s
default average cost value of $20 per kW for the State of Washington. Impacts include direct, indirect, and induced effects of O&M spending, which are
assumed to include spending on labor, materials, equipment, and other services. O&M expenditures are assumed to be spent in the State of Washington.
The JEDI model is run at the state-level, meaning any local expenditures and job estimates are associated with in-state impacts and not impacts at finer
spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the Columbia Solar Project has provided to communities.

Though not directly related to the project, Puget Sound Energy and PSE Foundation invested over $105,000 in
Kittitas County in 2022 and continued to invest in the community in 2023, partnering with community-based
organizations such as Habitat for Humanity and the Kittitas County Historical Museum to support charitable
programs catering to the needs of PSE’s customers and communities at large.164,165




164 2022 Puget Sound Energy Community Profile: Kittitas County. Accessed at

https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.pse.com/-/media/PDFs/Community-
profiles/Kittitas.pdf%3Fsc_lang%3Dhi%26modified%3D20230329205914%26hash%3D23D7856FB7B9997F98FEBF1CC1DBF3AF&ved=
2ahUKEwj-u_m15e-FAxVCHjQIHX8kDQAQFnoECBQQAQ&usg=AOvVaw2RzWFVtLdkmOZXVkP02OA-.
165 2023 Puget Soundy Energy Community Profile: Kittitas County. Accessed at

https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.pse.com/-/media/PDFs/Community-
profiles/Kittitas.pdf%3Frev%3Deea2d556d1ad499bbac5d8209f5c7e03%26sc_lang%3Den%26modified%3D20240416200950%26hash%
3DF78FF5CBD130A13756E9EE2B74EDC180&ved=2ahUKEwj-u_m15e-
FAxVCHjQIHX8kDQAQFnoECDoQAQ&usg=AOvVaw3kA5z_MqZ7rLZiSB9H7ZLK.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             118
Case Study: Rattlesnake Flat Wind Project




Photo: Courtesy of Grow Adams County

Type of                       Current        Nameplate       Years of                        Impervious
              Location                                                       Size                          Facilities
Project                       Owner          Capacity        Operation                       Surface

                                                                                                           57 turbines, substation,
                                                                             23,673 leased
Wind energy   Adams County,   Clearway                                                                     O&M facility, and 5
                                             144 MW          2020–present    acres on 99     80 acres
facility      Washington      Energy Group                                                                 permanent
                                                                             land parcels
                                                                                                           meteorological stations



Project Summary
Rattlesnake Flat Wind Project is a 144-megawatt (MW) capacity wind energy facility in Adams County,
Washington. The project came online in December 2020 after receiving 64 building permits from the County,
which included the installation of 57 turbines, five permanent meteorological stations, a project substation,
and an O&M facility.166 Construction was led by Blattner Energy, Inc., with turbines provided by Siemens
Gamesa Renewable Energy. Clearway Energy Group partnered with Avista Utilities to deliver the energy
generated by the turbines.167 Avista is headquartered in Spokane and provides service to eastern Washington,




166 Personal communication with Adams County Building Department on March 7, 2024.
167 “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for Rattlesnake Flat Wind

Farm”, Clearway Energy Group, December 15, 2020. Accessed on April 1, 2024 at https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          119
north Idaho, and southern and eastern Oregon.168 Rattlesnake Flat LLC, a subsidiary of NRG Renew LLC, was
the project applicant and taxpayer. Clearway Energy Group acquired 100 percent of Rattlesnake Flat LLC’s
equity interests in April 2020 and is the current owner of the project.169

The project lease area is approximately 23,000 acres. The project lease area intersects 99 land parcels, nearly
all of which are farmed (see below evaluation of impacts to impacts to agricultural crop areas). Most of the
project area continues to be zoned as prime farmland.170 One parcel within the project boundary is owned by
the Washington Department of Natural Resources.

The turbines occupy portions of 30 land parcels that encompass 8,973 acres, or 37.9 percent of the total
project area. The impervious surface of the turbines, access roads, and other facilities, is much smaller, at
approximately 80 acres.171




168 “Company Information”, Avista Corporation. Accessed on March 27, 2024 at https://investor.avistacorp.com/about-avista/company-

information.
169 “Clearway Energy, Inc. Announces Binding Agreements to Acquire and Invest in a Portfolio of Renewable Energy Projects”, Globe

Newswire, April 20, 2020. Accessed at https://www.globenewswire.com/news-release/2020/04/20/2018891/0/en/Clearway-Energy-
Inc-Announces-Binding-Agreements-to-Acquire-and-Invest-in-a-Portfolio-of-Renewable-Energy-Projects.html.
170 “SEPA Environmental Checklist”, July 2016.
171 “SEPA Environmental Checklist”, July 2016.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                         120
Figure B4. Rattlesnake Flat Wind Project in Adams County, WA (Washington State
Geospatial Portal,172 U.S. Wind Turbine Database,173 NRG Rattlesnake Flat Wind
Program Application174)




Geographic Location/Community Context
Rattlesnake Flat Wind Project occupies land in an unincorporated rural area of Adams County in the Columbia
River Basin/Plateau. Adams County is a rural county, with a population of 20,557 as of 2022.175 The project is
located about 10 miles southeast of the 569-person town of Lind, Washington and 15 miles south of Ritzville,
Washington, a town with a population of 1,733.176




172 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at https://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.
173 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E., 2018, United States Wind Turbine Database (ver.

6.1, November 2023): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data
release, https://doi.org/10.5066/F7TX3DN0. Accessed on February 12, 2024.
174 NRG Renew LLC. “Rattlesnake Flat Wind Project, Rattlesnake Flat Wind Project LLC, Adams County Washington.” Wind Permit

Application. June 14, 2018.
175 2022 ACS 5-Year Survey, U.S. Census Bureau.
176 2022 ACS 5-Year Survey, U.S. Census Bureau.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    121
Adams County’s two most populous cities are Ritzville and Othello.177 The County government employs 168
full time and 10 part-time individuals and has an annual budget of $59.6 million as of 2024.178,179

Table B7 summarizes community population statistics for the project area. As shown, the population in Adams
County has a lower median income, higher population without a high school diploma, and higher population
living below the poverty level than the state population overall.

Rattlesnake Flat is one of two operating utility-scale clean energy projects in Adams County. The second
project, the Adams-Neilson Solar Plant, is a smaller, 28 MW solar plant constructed in 2018.180

Table B7. Community population statistics for Rattlesnake Flat Project Area (2018 -
2022).
                                            Census tracts intersected by
    Metric                                                                     Adams County       State of Washington
                                            project

    Population (2022)                       1,935                              20,557             7,688,549

    10-Year Population Change (2012 –
                                            +20.3%                             +10.7%             +14.1%
    2022)

    Median Household Income                 $68,083                            $63,105            $90,325

    Population identifying as other than
                                            37.9%                              68.1%              34.5%
    white and non-Hispanic

    Population with income below federal
                                            15.1%                              20.9%              9.9%
    poverty level

    Population with less than high school
                                            20.6%                              29.0%              7.9%
    diploma or equivalent

    Population that is unemployed           2.4%                               3.9%               3.2%

    Population without health insurance     25.7%                              28.1%              9.2%

    Population over 65 years old            16.0%                              11.3%              16.0%

    Population with low English
                                            20.3%                              24.7%              7.7%
    proficiency

    Energy burdenb                          3.0%                               2.5%               1.5%

a
 The project intersects Census Tract 9502.
b
 Energy burden is defined as the percentage of gross household income spent on energy cost.
Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.181




177 “About Adams County”, Adams County Washington. Accessed at

https://www.co.adams.wa.us/residents/about_adams_county/index.php.
178 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
179 “Commissioner’s Proceedings”, Adams County Washington, December 20, 2023. Accessed at

https://cms5.revize.com/revize/adamscounty/DeptPages/Commisioners/Minutes/CP20231220.pdf on March 11, 2024.
180 “Power plant profile: Adams-Neilson Solar PV Park, US”, Power Technology, January 31, 2024. Accessed at https://www.power-

technology.com/marketdata/power-plant-profile-adams-neilson-solar-pv-park-us/?cf-view.
181 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        122
As shown in Figure B5, approximately 6.5 percent of Adams County is publicly owned, including approximately
1.9 percent federal, 4.6 state, and less than one percent county or locally owned lands.182 Agriculture and
livestock ranching are the primary economic activities in this county, with wheat, corn, and apples among the
most common crops.183 Adams County is one of the largest wheat producers in the state of Washington.
Eastern Adams County is farmed primarily with dryland crops – wheat, canola, camelina, sunflowers, etc. The
western portion of the county, known as the ‘panhandle,” is more diverse agriculturally due to the presence of
canal irrigation. Around Othello, a diverse selection of fruit and vegetable crops are raised.

Figure B5. Land ownership in Adams County, Washington.




182 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
183 “About Adams County”, Adams County Washington. Accessed at

https://www.co.adams.wa.us/residents/about_adams_county/index.php.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          123
Land Use
Figure B6. Agricultural land use surrounding turbine in Rattlesnake Flat Wind Project
area (Google Earth, 2023).




THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Rattlesnake Flat
Wind Project on land uses within the project lease area and discuss the likelihood of other potential effects
on nearby land uses.

Like other areas in this part of the county, NASS data from 2022 suggests that most of the crops grown in the
lease area are winter wheat, but also include spring wheat, alfalfa hay, and small areas of other crops. At
average 2023 crop values, the value of the crops in the lease area (21,177 crop acres) were approximately $3.8
million annually, or an average of $339 per acre in revenues.184




184 2023 Washington State Agriculture Overview, United States Department of Agriculture (USDA) and National Agricultural Statistics

Service (NASS). Accessed on March 6, 2024 at
https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            124
In 2019, land use in both the lease area and the project footprint area185 were used primarily for crop
agriculture, with 91.4 percent and 96.7 percent of these areas farmed, respectively.186,187 As shown in Table B8
and highlighted in Figure B7, following project implementation, data indicates that crop acres have decreased
slightly from before the project was constructed, with 21,177 acres of cropland harvested in the project lease
area following construction, and 8,529 acres in the project footprint area, a decrease of 2.2 and 1.7 percent in
cropland, respectively. Figure B6 (above) shows agricultural land use surrounding a turbine in the Rattlesnake
Flat Wind Project area in 2023.

Table B8. Cropland acres within project area before (2019) and after project (2022)
construction.

                             Pre-project, 2019                   Post-Project, 2022
Area                                                                                                Change (%)
                             (Acres, percent of total)           (Acres, percent of total)

Lease Area                   -                                   -                                  -

Crops                        21,645 (91.4%)                      21,177 (89.5%)                     -2.2%


Developed                    201 (0.8%)                          453 (1.9%)                         +125.7%

Other                        1,826 (7.7%)                        2,042 (8.6%)                       +11.8%


Total                        23,672 (100%)                       23,672 (100%)                      0%

Project Footprint            -                                   -                                  -

Crops                        8,678 (96.7%)                       8,529 (95.1%)                      -1.7%

Developed                    56 (0.6%)                           132 (1.5%)                         138.0%

Other                        237 (2.6%)                          310 (3.5%)                         30.8%

Total                        8,972 (100%)                        8,972 (100%)                       0%


Source: 2022 Cropland Data




185 The project footprint is defined as including parcels on which turbines are located.
186 2022 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on June 22, 2023 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
187 2019 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on March 18, 2024 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              125
Figure B7. Change in Rattlesnake Flat Project Area Land Use (2019 to 2022).




Source: 2022 Cropland Data


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates what we can
determine about the effects of Rattlesnake Flat Wind Project on landowners in Adams County.

As is common practice with wind energy project development in rural areas, land parcels in the Rattlesnake
Flat Wind Project area are leased by the project owner and most retain their original land ownership status. As
discussed above, parcels in this area continue to be farmed following project implementation. Property owners
within the leased areas typically enter into lease agreements with the project owners for a pre-development
period (typically ranging from two to five years in duration). After the design of the project is established,
landowners for which physical infrastructure is developed are further compensated on a per acre basis at an



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                     126
established fee. While these agreements are generally confidential to the parties engaged, some agreements
made with public entities are made public that provide insights into these payments.

One lease agreement was publicly available for a single 640-acre parcel in the Rattlesnake Flat Wind Project
area that is owned by the Washington State Department of Natural Resources. Under this agreement,
payments change throughout the lifecycle of the project. Specifically:

    1. Predevelopment: The owner is paid $7,500 up front, plus $5,000 annually.
    2. Construction: The owner is paid $4,000 per MW capacity for each turbine installed on the premises.
    3. Operations: The State is paid a percentage of quarterly gross revenues.

The Adams County Building Department suggests that the project was permitted in 2020, with construction
lasting from April 2020 through approximately January 2021.188 Assuming a four-year pre-development period,
and a two-year construction period, we estimate the payments to the WADNR for this parcel to be $92,000
during predevelopment and construction phases, given that there were three 2.9 MW turbines and a
meteorological station installed on the parcel.189 Payments associated with gross project revenues are
uncertain during the production period. Using average annual energy production of 396,000 MWh from all 57
turbines and an approximate power purchase agreement (PPA) price of $27/MWh the lease would provide
DNR with approximately $28,000 in years one to 10 of 127 operation and up to $40,000 per year in later years
(all values 2023 dollars).190,191

We are not certain whether the landowner payments to WADNR reflect the market for private parcels but
suspect that they are roughly equal to the private market leasing rate.192

Table B9. Estimated WADNR payments for parcel with three turbines.
Year                                    Value                                                                 Total

Year 1 (Predevelopment)                 $12/acre                                                              $7,500

Year 2 (Predevelopment)                 $8/acre                                                               $5,000

Year 3 (Predevelopment)                 $8/acre                                                               $5,000

Year 4 (Predevelopment)                 $8/acre                                                               $5,000

Year 5 (Construction)                   $4000 x 2.9MW/turbine = $11,600/turbine x 3                           $34,800

Year 6 (Construction)                   $11,600/turbine x 3                                                   $34,800

                                                                                                              Uncertain, ~$28,000 up to
Year 7 – 30 (Operations)                5-7% of gross quarterly revenues
                                                                                                              $40,000 per year




188 Personal communication with Adams County Building Department on March 7, 2024.
189 Rattlesnake Flat Wind Power Development Lease, 2019. Provided by WA DNR on March 25, 2024.
190 “Emissions & Generation Resource Integrated Database (eGRID), 2022.” United States Environmental Protection Agency (EPA).

Office of Atmospheric Protection, Clean Air Markets Division, 2024, Washington DC. https://www.epa.gov/egrid.
191 Wiser, Ryan, et al. Land-based wind market report: 2023 edition. Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United

States), 2023.
192 While it is difficult to directly compare leases given the variety of factors likely considered in individual agreements, several publicly

available estimates provided similar annual values. Wind Exchange from the DOE estimated $7,800 in the west
(https://windexchange.energy.gov/economic-development-guide), Windustry estimates $4,000 to $8,000 per turbine or $3,000 to
$4,000 per MW (https://www.windustry.org/how_much_do_farmers_get_paid_to_host_wind_turbines) and a recent presentation at a
USDA forum presented $10,000 as an example (https://www.usda.gov/sites/default/files/documents/2023aof-Sherrick.pdf).


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    127
Sources: Wind Power Development Lease [2019]; Accessed on March 20, 2024 at https://adamswa-
taxsifter.publicaccessnow.com/Search/Results.aspx; “Emissions & Generation Resource Integrated Database (eGRID), 2022.” United States
Environmental Protection Agency (EPA). Office of Atmospheric Protection, Clean Air Markets Division, 2024, Washington DC.
https://www.epa.gov/egrid. Wiser, Ryan, et al. Land-based wind market report: 2023 edition. Lawrence Berkeley National Laboratory (LBNL), Berkeley,
CA (United States), 2023.

We also evaluated assessed values of the parcels within the project lease area prior to and following
Rattlesnake Flat Wind Project construction. As shown, parcels in the project footprint and parcels in the parcel
lease area had similar assessed values on a per acre basis prior to project implementation, with slightly lower
average parcel values for the 30 parcels in the project footprint ($141,318) compared with the other parcels in
the project lease area ($168,876). Following project construction in December 2020, we did not observe clear
changes to the property values, which averaged $138,705 for parcels within the project footprint and $173,685
for parcels within the project boundary in 2022.193

Figure B8. Property values of Rattlesnake Flat Wind Project leased areas over time.




Source: Adams County TaxSifter, 2019-2023. Range of per property values for all properties in footprint and lease area. Accessed on March 20, 2024 at
https://adamswa-taxsifter.publicaccessnow.com/Search/Results.aspx.


Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Since construction, Rattlesnake Flat Wind Project taxes have been assessed as personal property by Adams




193 Adams County TaxSifter. Accessed on March 20, 2024 at https://adamswa-taxsifter.publicaccessnow.com/Search/Results.aspx.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                            128
County. The project is assessed by the county, the project footprint is entirely within Adams County.194 The
initial assessed value was $129.8 million in 2021.

Personal property tax payments initiated post-construction at over $1.2 million per year in 2022, 2023, and
(assessed) in 2024. Because the infrastructure is anticipated to depreciate over time, the personal property tax
payments made to the county will decline over time. Although improvements to the project may alter the
schedule, the depreciation is anticipated to decline at a rate that is approximately consistent with the
published state schedule of four percent for utility-scale renewable energy development.195 Based on this
schedule, the project would depreciate to 50 percent of its original value by year 12 and 15 percent by year 22
and beyond. By years 22 and beyond, this would result in approximate personal property tax payments of one
sixth of their current tax payments (e.g., approximately $200,000 to $250,000 per year) using the current tax
levies and valuation guidelines.

Landowners of leased parcels are responsible for paying annual property taxes to the county. As noted above,
these real property taxes are likely to be paid or reimbursed by the project owner as part of the lease
agreements. A small number of parcels also list Rattlesnake Flat LLC as owner and are taxed as real property
to Rattlesnake Flat. As shown in Table B10, real property tax payments from the project occurred in 2019
through today.

Table B10. Rattlesnake Flat wind project tax payments, 2019 – 2023 (2023 dollars).

                                                                                   Total Adams County Tax
 Year               Real Property Tax              Personal Property Tax                                          % of County Tax Roll
                                                                                   Collected

 2019               $8,094                          N/A                            $25,596,339                    0.0%

 2020               $8,149                          N/A                            $27,842,050                    0.0%

 2021               $7,879                          N/A                            $28,281,960                    0.0%

 2022               $23,923                        $1,337,217                      $28,388,668                    4.8%

 2023               $23,446                        $1,222,303                      $30,148,629                    4.1%

 Total              $71,491                        $2,559,520                      $140,257,646                   4.4% (since 2022)

Parcels assigned to Rattlesnake Flat: 2635090130001, 4000001103950, 4000001103951, 4000001103952, 4000001103953, 2735220100001,
2735230000001, 2735150000001, 2735150000002. The projected 2024 assessment for the personal property taxes for the project is $1.39 million.

Sources: Adams County TaxSifter, accessed on March 20, 2024 at https://adamswa-taxsifter.publicaccessnow.com/Search/Results.aspx., Washington
State Department of Revenue Property Tax Statistics, 2019-2023. Accessed March 2024.


Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have




194
      Personal communication with Washington State Department of Revenue on March 25, 2024.
195 Personal Property Valuation Guidelines, Washington State department of Revenue. Accessible at: https://dor.wa.gov/taxes-

rates/property-tax/personal-property-valuation-guidelines


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                         129
gathered about the extent of impacts that project construction and operations have had on employment in
Adams County.


Direct Investments
The costs of the project were reported by GlobalData’s Power Intelligence Center as being $267 million, which
includes local spending, direct operating and maintenance costs, and other annual costs such as land
leases.196

Clearway Energy states that, as of December 2023, the Rattlesnake Flat project invested approximately $13
million into the local economy and will continue to invest $350,000 annually while the wind farm is
operating.197 It is not clear from this source whether this figure refers to County tax payments, lease payments
or other sources of investment.

Employment
Table B11 presents occupations of residents within the project lease area census tract, Adams County, and
the State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are high in the relevant census tract (25 percent) as well as Adams
County (29 percent) when compared with the Washington State average (9.4 percent).

Table B11. Occupation of residents on and nearby the Rattlesnake Flat Wind Project,
2018 - 2022.
                                               Employment in Census        Employment in Adams         Employment in State of
 Occupation                                    tracts intersected by       County                      Washington
                                               project* (% of total)       (% of total)                (% of total)

 Management/Business/Science/Arts              226 (24.9%)                 2,011 (24.2%)               1,664,322 (44.4%)

 Sales/Office                                  133 (14.6%)                 1,271 (15.3%)               697,384 (18.6%)

 Service                                       137 (15.1%)                 1,137 (13.7%)               595,994 (15.9%)

 Production/Transportation/Material Moving     155 (17.1%)                 1,482 (17.8%)               443,300 (11.8%)

 Natural Resources/ Construction/Maintenance   257 (28.3%)                 2,404 (28.9%)               351,076 (9.4%)

 Total                                         908 (100%)                  8,305 (100%)                3,752,076 (100%)

*The project intersects Census Tract 9502.
Source: 2022 ACS 5-Year Survey.

Clearway Energy states that the Rattlesnake Flat Wind Project created 250 jobs as well as providing 10 full-
time employees who operate and maintain the farm [the consultant team was unable to communicate with




196
    “Rattlesnake Flat Wind Farm, US,” Power Technology, December 7, 2021. Accessed at https://www.power-
technology.com/marketdata/rattlesnake-flat-wind-farm-us/?cf-view.
197 “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for Rattlesnake Flat Wind

Farm”, Clearway Energy Group, December 15, 2020. Accessed on April 1, 2024 at https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                      130
Clearway to independently verify this].198 Communication with Grow Adams County verified that there are 9 to
10 full time employees on the project site as of 2024 that include a site manager and maintenance crews, who
live in nearby areas.199 The specific source of the 250-job estimate is not clear, as is the extent of these jobs
that were created locally to the project. The construction company used for the project was Blattner Energy,
Inc., which is headquartered in Minnesota, and which advertises expertise in wind and solar contracting
services nationwide. Current employment listings include what appear to be positions in specific construction
sites in various western states, but do not include Washington State as of March 2024.200 Anecdotal evidence
suggests that the crews that conducted the construction of the project were generally not local to Adams
County, although some local general contract labor may have been used.

Avista published a modeled estimate using an input-output built by NREL to evaluate the impacts of the project
on the Washington State economy. This model estimates the direct, as well as the indirect (supplier) and
induced (consumer spending) effects associated with project expenditures. Table B12 presents the estimate
for the Rattlesnake Flat project. As shown, Avista estimated that the project development resulted in 348 jobs
and contributed $72 million to the State of Washington. However, the assumptions about the initial
expenditures on the project and the assumptions about the origins of capital expenditures, including
construction labor, are not clear.

To the extent that 250 construction jobs were created during a one-year period for the project, these would
have represented an increase of three percent in total employment in the County.

This project also was reported to have a Project Labor Agreement, which is an agreement between the
contractor and its employees which establishes worksite conditions and routes to resolve labor disputes.
These agreements typically include goals that promote the hiring of local community members, veterans,
disadvantaged workers, and/or small businesses. This helps focus economic impacts of the project in the
local community. However, we were unable to procure any specifics of this agreement [the consultant team
was unable to communicate with Clearway to independently verify this]. 201,202

Table B12. JEDI-derived job creation estimates for the Rattlesnake Flat Wind Project
from Avista Report in the State of Washington.
Economic Impact                             Jobs                     Earnings                  Output

Direct (per MW)                             0.56                     $41,319                   $45,486

Indirect (per MW)                           1.50                     $41,319                   $316,042

Induced (per MW)                            0.66                     $46,528                   $143,819




198 “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for Rattlesnake Flat Wind

Farm”, Clearway Energy Group, December 15, 2020. Accessed on April 1, 2024 at https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm/.
199 Personal communication with Adams County Development Council on March 29, 2024.
200 Blattner Energy Career Opportunities. Accessed on March 29, 2024 at https://blattner.wd5.myworkdayjobs.com/BlattnerEnergy .
201 “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for Rattlesnake Flat Wind

Farm”, Clearway Energy Group, December 15, 2020. Accessed on April 1, 2024 at https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm/.
202 City of Seattle, Department of Finance and Administrative Services, What is a Project Labor Agreement?” Accessed at

https://www.seattle.gov/documents/Departments/FAS/PurchasingAndContracting/Labor/LaborAgreement.pdf on March 14, 2024.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       131
 Economic Impact                                    Jobs                         Earnings      Output

 Total (per MW)                                     2.72                         $129,166      $505,347

 Implied Impacts of Rattlesnake Flat Wind
                                                    392                          $18,599,904   $72,769,968
 Project (144 MW)

Source: DNV, “Supply Side Non-Energy Impacts Report,” prepared for Avista, April 8, 2022.


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the Rattlesnake Flat Wind Project has provided to communities.

According to a Clearway Energy press release, Clearway and Avista donated to local organizations including
the Washtucna Heritage Museum and Community Center, the Adams County Fire Protection District #7, and
the Lind Senior Center [the consultant team was unable to independently verify this]. To address challenges
created by the COVID-19 pandemic, Clearway additionally donated to local food banks. Furthermore, because
the project is built partially on public land, the Department of Natural Resources elected to use the revenue
from land leases to directly fund local government services and construction of schools.203




203 “Clearway Energy Group, Avista Host Ribbon-Cutting to Mark Commencement of Commercial Operations for Rattlesnake Flat Wind

Farm”, Clearway Energy Group, December 15, 2020. Accessed on April 1, 2024 at https://www.clearwayenergygroup.com/press-
releases/clearway-energy-group-avista-host-ribbon-cutting-to-mark-commencement-of-commercial-operations-for-rattlesnake-flat-
wind-farm/.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          132
Case Study: Skookumchuck Wind Project




Photo: Courtesy of Southern Power


 Type of                                            Nameplate         Years of
              Location              Current Owner                                      Size               Facilities
 Project                                            Capacity          Operation

 Wind         Thurston and Lewis Southern                                              10,206 leased      38 turbines, O&M Yard,
 energy       County,            Power              136 MW            2020–present     acres on 27 land   access roads,
 facility     Washington         Company                                               parcels            transmission lines


Project Summary
Skookumchuck Wind Project is a 144-megawatt (MW) capacity wind energy facility that spans Lewis and
Thurston County in Washington. The construction process, which included the installation of 38 turbines,
multiple access roads, transmission lines, and a five-acre Operation and Maintenance Yard, was completed in
December 2020.204 Though the project was developed by Renewable Energy Systems, Southern Power
Company acquired the project in August 2019 and saw it through to completion.205 Weyerhaeuser Company, a
timber company, is the landowner; this is the sixth wind project to be constructed on their timberlands across




204 “Notice of Application”, Thurston County Resource Stewardship Department. May 30, 2017.
205 “Skookumchuck Wind Facility Fact Sheet”, Southern Power Company. August 2019.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        133
the United States.206 The energy produced by the wind farm is sold to Puget Sound Energy for distribution to
several counties in Western Washington, including Thurston and Lewis counties.207 Skookumchuck Wind
Energy Project LLC is the project applicant and taxpayer.208

The project lease area is approximately 10,206 acres in size and intersects 27 land parcels, all of which are
owned by Weyerhaeuser for logging purposes. The turbines occupy portions of 15 land parcels that
encompass 7,538 acres, or 73.8 percent of the total project area.




206 “Un-Vail-ing Our First Wind Farm in the West”, Weyerhaeuser Company. January 21, 2022. Accessed on April 25, 2024 at

https://www.weyerhaeuser.com/blog/un-vail-ing-our-first-wind-farm-in-the-west/.
207 “PSE Locations”, Puget Sound Energy. Accessed on April 25, 2024 at https://www.pse.com/en/Customer-Service/pse-locations-2.
208 Skookumchuck Wind Energy Notice of Application. May 2017.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       134
Figure B9. Skookumchuck Wind Project in Lewis and Thurston Counties, WA
(Washington State Geospatial Portal,209 U.S. Wind Turbine
Database,210Skookumchuck Supplemental211)




Geographic Location/Community Context
Skookumchuck Wind Project occupies land in Thurston and Lewis Counties. Though both counties are
technically contained within the project boundaries, the analysis focused on Lewis County as it accounts for
92.2 percent of project lease area, which includes the entirety of the turbines.

Skookumchuck Wind Project occupies land in Lewis County in western Washington. Lewis County is an urban
county, with a population of 82,663 as of 2022, making it the 16th largest county in the State based on
population. The project is located about 15 miles east of Centralia, the most populous city in the county with a



209 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at https://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.
210 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E., 2018, United States Wind Turbine Database (ver.

6.1, November 2023): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data
release, https://doi.org/10.5066/F7TX3DN0. Accessed on February 12, 2024.
211 “Skookumchuck Supplemental Application”, Thurston County Resource Stewardship. April 28, 2014.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    135
population of 18,773. The county seat is Chehalis, with a population of 7,645 in 2022.212 The county
government employs 541 full-time and 54 part-time individuals and has an annual budget of $207.7
million.213,214

Table B13 summarizes community population statistics for the project area. As shown, the population in Lewis
County has a lower median income, higher white and non-Hispanic population, and higher energy burden
relative to the state population overall.

Table B13. Community population statistics for Skookumchuck Project Area
(2018 - 2022).
                                             Census tracts intersected by
    Metric                                                                      Lewis County                    State of Washington
                                             projecta

    Population (2022)                        8,339                              82,663                          7,688,549

    10-Year Population Change (2012 –
                                             + 15.8%                            + 9.6%                          + 14.1%
    2022)

    Median Household Income                  $83,740                            $67,247                         $90,325

    Population identifying as other than
                                             13.7%                              18.8%                           34.5%
    white and non-Hispanic

    Population with income below federal
                                             6.2%                               12.3%                           9.9%
    poverty level

    Population with less than high school
                                             11.1%                              10.5%                           7.9%
    diploma or equivalent

    Population that is unemployed            2.1%                               3.5%                            3.2%

    Population without health insurance      11.1%                              10.6%                           9.2%

    Population over 65 years old             21.5%                              21.0%                           16.0%

    Population with low English
                                             3.0%                               2.8%                            7.7%
    proficiency

    Energy burden b                          2.3%                               2.5%                            1.5%

a
 The project intersects Census Tracts 9711 and 9718. The statistics above represent a population-weighted average.
b
 Energy burden is defined as the percentage of gross household income spent on energy cost.
Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.215




212 2022 ACS 5-Year Survey, U.S. Census Bureau.
213 “2023 Budget Report”, Lewis County. Accessed on April 25, 2024 at

https://lewiscountywa.opengov.com/transparency#/73152/accountType=expenses&embed=n&breakdown=c89511c3-d239-44fd-
9d00-
a5200b590ce7&currentYearAmount=cumulative&currentYearPeriod=years&graph=bar&legendSort=desc&proration=true&saved_view=
518274&selection=E5EED350B4EBA880046EB18304C3A416&projections=null&projectionType=null&highlighting=null&highlightingVari
ance=null&year=2023&selectedDataSetIndex=null&fiscal_start=earliest&fiscal_end=latest.
214 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
215 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                136
As shown in Figure B10, approximately 46.4 percent of the combined land of Thurston and Lewis Counties is
publicly owned, including approximately 36.0 percent owned federally, 8.4 percent owned by the state, 1.8
owned by the local government for conservation, and 0.2 percent owned by tribes.216

Lewis County is home to the Port of Centralia, which houses many businesses. The county also generates
income via ecotourism from visitors looking to explore Gifford Pinchot National Forest.217 Coal mining and
lumber harvest and processing are also major economic activities in this county.218

Figure B10. Land ownership in Thurston and Lewis County, Washington.




216 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
217
    2019 Lewis County Economic Profile. Western Washington University Center for Economic and Business Research.
218 “Lewis County Spotlight”, Washington State Association of Counties. Accessed on April 26, 2024 at https://wsac.org/county-

spotlights/county-spotlight-lewis/.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           137
Figure B11. Forestry land use surrounding turbines in Skookumchuck Wind Project
area (Google Earth, 2023).




Land Use
THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Skookumchuck
Wind Project on land uses within the project lease area and discuss the likelihood of other potential effects
on nearby land uses.

Unlike many other renewable energy projects in the State, the land in the lease area is zoned as forest resource
land.219 Of the 10,206 total acres in the lease area, 72.4 percent is evergreen forest, 20.8 percent shrubland, 2.3
percent grassland/pastureland, 0.3 percent mixed forest, and 0.2 percent deciduous forest.220 The largest
land cover class, evergreen forest, includes tree species common to managed forests in this region, such as
Douglas fir, western hemlock, and western red cedar.




219 Personal communication with Lewis County Community Development Office on March 8, 2024.
220 2023 Washington State Agriculture Overview, United States Department of Agriculture (USDA) and National Agricultural Statistics

Service (NASS). Accessed on March 6, 2024 at
https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            138
Prior to project construction and operation, all commercial timber lands in the lease area have been cut at least
once, with certain areas on their third or fourth rotation.221 In comparison, only 2.9 acres of land in the lease
area (less than one percent) were used to grow crops, including blueberries, Christmas trees, and corn. Though
the project is understood to be situated on lower value timber lands,222 the land still provides Weyerhaeuser
with significant revenue. At average timber values, timber in the project footprint in 2022 (7,182 acres)223 was
worth approximately $15.2 million (2023 USD), or an average of $2,116 per acre in value, which stayed the
same as the value in 2019 due to the difference of just two acres of forest cover based on satellite
imagery.224,225 See Table B14 note 1 for additional discussion of satellite imagery at this site.

In addition to timber value, Weyerhaeuser Company gains recreational value from the land by selling permits
granting annual access to recreational users of their forests.226 Annual permit prices in the area roughly $125
per permit for non-motorized permits, as the region has permit area restrictions that limit recreational users to
non-motorized use only.227

In 2019, land cover in both the lease area and the project footprint area228 were primarily forestland, with 96.0
percent and 95.3 percent of these areas forested, respectively.229,230 As shown in Table B14 and highlighted in
Figure B12, following project implementation, data indicates that forested acres are essentially unchanged
from before project construction, with one acre of forestland in the project lease area lost following
construction, and two acres lost in the project footprint area, a minimal decrease of 0.02 percent in forestland
for both cases. Figure B11 shows other land uses surrounding a turbine in the Skookumchuck Wind Project
area in 2023.

Table B14. Forestland within project area before (2019) and after project (2022)
construction.

                              Pre-project, 2019                      Post-Project, 2022
Area                                                                                                          Change (%)
                              (Acres, percent of total)              (Acres, percent of total)

Lease Area                    -                                      -                                        -

Forest1                        9,798 (96.0%)                         9,796 (96.0%)                            -0.02%

Developed                      386 (3.8%)                            388 (3.8%)                               +0.50%




221 “Skookumchuck Wind Energy Project Proposed Habitat Conservation Plan and Incidental Take Permit for Marbled Murrelet, Bald

Eagle, and Golden Eagle Lewis and Thurston Counties, Washington: Final Environmental Impact Statement”, Anchor QEA LLC. 2019.
Prepared for U.S. Fish and Wildlife Service.
222 Personal communication with Lewis County Community Development Office on March 8, 2024.
223 We arrived at this acreage figure through analysis of GIS data showing the area that is forest cover in the project area, assuming that

all forest cover is producing timberland because it is owned by Weyerhaeuser Company.
224 “Timber Asset Class”, Deloitte. 2018.
225 The total value we estimate (adjusted to 2023 dollars) is based on the timber value per net acre (2018 dollars) in the State of

Washington derived from the portion of the total acreage size in trust-owned timberland available for harvest given restrictions and
limitations such as federal laws, forest practice rules, and more.
226 “Our Programs”, Weyerhaeuser. Accessed on April 24, 2024 at https://recreation.weyerhaeuser.com/Programs.
227 “Vail Permit Area Details”, Weyerhaeuser. Accessed on April 24, 2024 at

https://recreation.weyerhaeuser.com/Permits/Search/c15e15be-08df-4621-a09a-9abb827a8869.
228 The project footprint is defined as including parcels on which turbines are located.
229 2022 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on June 22, 2023 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
230 2019 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on March 18, 2024 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                139
                                  Pre-project, 2019                          Post-Project, 2022
    Area                                                                                                                   Change (%)
                                  (Acres, percent of total)                  (Acres, percent of total)

    Other                         22 (0.2%)                                  22 (0.2%)                                     0.00%

    Total                         10,206 (100%)                              10,206 (100%)                                 0%

    Project Footprint             -                                          -                                             -

    Forest1                       7,184 (95.3%)                              7,182 (95.3%)                                 -0.02%

    Developed                     339 (4.5%)                                 341 (4.5%)                                    +0.67%

    Other                         14 (0.2%)                                  14 (0.2%)                                     +0.00%

    Total                         7,537 (100%)                               7,537 (100%)                                  0%

Source: 2022 Cropland Data

1
  The category “Forest” describes land visualized by satellite imagery as either “Forest,” “Grass” or “Shrub” due to the nature of the leased area and
quality of available satellite imagery. Through reviewing satellite data, the forests within the leased area appear actively managed, with evidence of 2019
selective logging followed by 2022 canopy cover restoration. Around 1,900 acres classified as forest in 2022 were categorized as shrub in 2019 by
satellite data. Despite minimal visible changes in these areas (2019 to 2022), historical imagery reveals they were cut 20 years ago. These areas likely
transitioned from barren land to grass, then to shrub, and eventually to forest. The classification algorithms use both visible and invisible spectral data
and may fail to distinguish new forest from shrub or eventually mature forest. Our analysis assumes that land currently categorized by satellite imagery
as “Grass” or “Shrub” are essentially “Forest,” just in earlier successional phases following harvest.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                140
Figure B12. Change in Skookumchuck Project Area Land Use (2019 to 2022).




Source: 2022 Cropland Data


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values.

Unlike many other wind energy project developments, land parcels in the Skookumchuck Wind Project area are
owned by a single corporation, Weyerhaeuser Timber Holdings Inc., rather than individual landowners. The
area is part of the Vail Tree Farm. It is unclear when Weyerhaeuser acquired these parcels. As discussed
above, most of this area was used for timberlands previously and it is unlikely that project implementation
resulted in any material change in land use patterns.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                  141
Based on a power purchase agreement (PPA) price of $41/MWh, Skookumchuck would generate
approximately $15 million in annual revenue based on average production to date (approximately 360,000
MWh per year). This equates to nearly $400,000 per year, per turbine.

We were unable to gather leasing data or clarify any agreements between Weyerhaeuser and Southern Power
following development. Assuming Southern Power pays Weyerhaeuser leasing fees as a percentage of
revenues (e.g., three to seven percent), the project could earn Weyerhaeuser $500,000 to $1 million per year. In
addition, Weyerhaeuser noted that a lease was in place since 2012, but that construction didn’t begin until
seven years later.231 The company likely also received small lease payments per acre (e.g., less than
$500/acre) during this time.

Overall, the entire project area is estimated to have a timber value of $14.1 million. It is difficult to estimate the
lost timber value without confirmed knowledge of continued access to the site and plans for future harvesting
as well as concerns about changes in the forest area based on satellite imagery, discussed above. Unless
Weyerhaeuser cannot harvest any of the project area forest, they would easily recoup their timber losses via
lease payments over several years of leasing payments. Based on the satellite data, the loss of two acres
would only cost Weyerhaeuser $4,000 in timber value, recouped in a year of lease payments for one turbine. If
more areas of timber are inaccessible and then the lost value could be higher, however Weyerhaeuser’s lease
payments will exceed these losses. In an illustrative example, should 3 percent of timber area be inaccessible
(i.e., a loss of approximately 400 acres values at over $800,000) the lease payments could provide
Weyerhaeuser up to $15 million in net revenue at the higher leasing rate over 30 years.232

We also evaluated assessed values of the parcels within the project lease area prior to and following
Skookumchuck Wind Project construction. As shown below in Figure B13, parcels in and out of the footprint
had similar assessed value prior to project implementation. Following project construction in December 2020,
the average value of parcels within the project footprint increased significantly, reaching $392,166 per parcel in
2022, while parcels outside the footprint averaged a value of $85,550 per parcel in 2022.233




231 “Un-Vail-ing Our First Wind Farm in the West”, Weyerhaeuser Company. January 21, 2022. Accessed on April 25, 2024 at

https://www.weyerhaeuser.com/blog/un-vail-ing-our-first-wind-farm-in-the-west/.
232 This revenue estimate is based on a 30-year payment period for the higher leasing rate using a 5 percent discount rate consistent

with DCF discounting practices described in the Timber Asset Class report. At the lowest lease payment rate (3%) the value would be
still be over $5 million. For the project not to be financially viable over half of the forest area in the entire lease area would have to be
inaccessible.
233 Lewis County Parcels. Accessed on April 15, 2024 at https://parcels.lewiscountywa.gov/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                     142
Figure B13. Property values of Skookumchuck Wind Project leased areas over time.




Source: Lewis County Parcels, 2016-2023. Standard deviation of average per parcel values for all properties in footprint and lease area. Accessed on
April 30, 2024 at https://parcels.lewiscountywa.gov/.


Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Since construction, Skookumchuck Wind personal property taxes have been centrally assessed by the state
Department of Revenue. The project is assessed by the state because the project footprint spans two counties
(Thurston and Lewis). However, the following section describes Lewis taxes exclusively as they account for
nearly all (over 95 percent) of the assessed value. The initial assessed value for the personal property of the
wind turbines was $268 million in 2021 ($281 million in 2023 dollars).234

Beginning in 2021, once construction was complete, we estimate personal property tax payments at
approximately $2 million per year based on the 10-year historical average levy rate for Lewis County of
$8.13/$1,000 and the state assessment value for the project in 2021 of $268 million. Because the
infrastructure is anticipated to depreciate over time, personal property tax payments made to the county will
decline over time. Although improvements to the project may alter the schedule, depreciation is anticipated to
decline at an annual rate consistent with the published state schedule of four percent for utility-scale
renewable energy development.235 Based on this schedule, the project would depreciate to 50 percent of its



234 State-assessed utility valuations. Washington State Department of Revenue. Accessible at: https://dor.wa.gov/about/statistics-

reports/state-assessed-utility-valuations.
235 Personal Property Valuation Guidelines, Washington State Department of Revenue. Accessible at: https://dor.wa.gov/taxes-

rates/property-tax/personal-property-valuation-guidelines


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             143
original value by year 12 and 15 percent by year 22 and beyond. By years 22 and beyond, this would result in
personal property tax payments approximately one sixth of current tax payments (e.g., approximately $300,000
to $350,000 per year) using the current tax levies and valuation guidelines.

Landowners of leased parcels continue to be responsible for paying annual property taxes to the county. As
noted above, these real property taxes are likely to be paid or reimbursed by the project owner as part of the
lease agreements. As shown in Table B15, real property tax payments from 2019 through the present were
relatively minor compared to personal property tax payments.

The sale of machinery and equipment also generates sales tax revenue for both the State and county. Lewis
County had a 1.3 percent sales tax in 2020; combined with the state 6.5 percent rate, the overall levy totals to
7.8 percent sales tax. This sales tax on materials and equipment would generate approximately $12.6 million
(2023 USD) in sales tax (based on a total sales figure of approximately $162 million).236 However, based on a
75 percent state exemption for renewable energy, payments would be closer to $2 million, of which
approximately $525,000 would go to the County. The project will continue to generate sales tax revenue on a
periodic basis, whenever project machinery or equipment is replaced or refurbished.

With these assumptions, we can observe changes in total property and sales tax revenues from the year before
and after project construction was completed in 2020. From 2019 to 2021, we find total Lewis County taxes
increased by approximately eight percent and increased further by five percent and three percent in 2022 and
2023, respectively.

Table B15. Skookumchuck wind property project tax payments, Lewis County, 2019 –
2023.
          Real            Estimated                                                 Total Project        Total County Taxes
                                               Total Project     Total County                                                    % of County
 Year     Property        Personal                                                  Collections          Collected (2023
                                               Collections       Tax Collected                                                   Tax Roll
          Tax             Property Tax*                                             (2023 dollars)       dollars)

 2019     $17,770         --                   $17,770           $89,781,497        $20,891              $105,548,159            0.02%

 2020     $38,782         --                   $38,782           $102,166,475       $44,999              $118,543,204            0.04%

 2021     $19,543         $2,055,279           $2,074,822        $102,622,672       $2,301,858           $113,852,104            2.0%

 2022     $60,913         $2,064,407           $2,125,319        $115,315,597       $2,202,785           $119,518,737            1.8%

 2023     $58,901         $1,924,676           $1,983,577        $123,556,938       $1,983,577           $123,556,938            1.6%

                                                                                                                                 1.1%
 Total    $195,910        $6,044,361           $6,240,271        $533,443,179       $6,554,110           $581,019,143
                                                                                                                                 (average)

Over 20 parcels are assigned to Skookumchuck.
* Personal property tax payments were estimated using the average levy rate for the past 10 years (8.13/$1,000) in Lewis County and the state
assessment value for Skookumchuck in Lewis County for each year.
Sources: Lewis County Treasurer Parcel Database, WA Department of Revenue. State-assessed Utility Valuations and WA DOR Average levy rates by
county.




236 IEc analysis. We assume qualified expenditures that would generate sales taxes include material and equipment cost categories

specified in the onshore wind JEDI model. Costs for each category are estimated by first taking the product of the project’s rated
capacity (136.8 MW) and the onshore wind JEDI model’s default average cost value of $1,531 per kW (including sales tax) in the State
of Washington, then by distributing the estimate by the default proportions of total costs for each cost category.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                       144
Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have
gathered about the extent of impacts that project construction and operations have had on employment in
Lewis County.


Direct Investments
We estimate total Skookumchuck Wind Project costs using the Jobs and Economic Development Impact
(JEDI) input-output model built by NREL for on-shore wind energy development. For this estimate, we use the
model assumption that wind energy project installation and capital expenditure costs are $1,531 per kW in the
State of Washington (2023 USD). Similarly, we assume that project operation and maintenance (O&M) costs
are $38 per kW. Using these assumptions, we estimate total Skookumchuck Wind Project construction and
installation costs to be approximately $209.4 million. O&M costs are estimated to be $5.4 million.

As part of the 2019 Final Environmental Impact Statement (EIS) prepared for the U.S. Fish and Wildlife Service,
Anchor QEA LLC estimated the total construction cost of the project to be approximately $235 million (2018
USD), of which $118 million (50 percent) would be purchased outside of the State of Washington due to the
lack of local availability of specialized equipment. Anchor QEA LLC estimates spending in the regional study
area (defined as Lewis County, Thurston County, and counties for which the economic centers of Olympia,
Tacoma, and Seattle are located), including site preparation and construction, to be around $60 million (2018
USD). Anchor QEA LLC also estimates project operation costs to be on average approximately $7.4 million per
year, which includes equipment O&M, lease payments on the Project footprint, insurance, and other expenses
such as decommissioning costs.237

Employment
Table B16 presents occupations of residents within the project lease area census tract, Lewis County, and the
State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are high in the relevant census tract (14.5 percent) as well as Lewis
County (14.9 percent) when compared with the Washington State average (9.4 percent). Production,
transportation, and material moving industries are also more common in the relevant census tract (22.7
percent) and county (16.8 percent) compared to the Washington State average (11.8 percent).

Table B16. Occupation of residents on and nearby the Skookumchuck Wind Project,
2018 - 2022.
                                              Employment in Census      Employment in Lewis        Employment in State of
 Occupation                                   tracts intersected by     County                     Washington
                                              project* (% of total)     (% of total)               (% of total)

 Management/Business/Science/Arts             559 (30.9%)               10,956 (31.8%)             1,664,322 (44.4%)

 Sales/Office                                 290 (16.0%)               6,604 (19.1%)              697,384 (18.6%)

 Service                                      290 (16.0%)               5,981 (17.3%)              595,994 (15.9%)



237
   “Skookumchuck Wind Energy Project Proposed Habitat Conservation Plan and Incidental Take Permit for Marbled Murrelet, Bald
Eagle, and Golden Eagle Lewis and Thurston Counties, Washington: Final Environmental Impact Statement”, Anchor QEA LLC. 2019.
Prepared for U.S. Fish and Wildlife Service.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          145
                                                      Employment in Census           Employment in Lewis             Employment in State of
 Occupation                                           tracts intersected by          County                          Washington
                                                      project* (% of total)          (% of total)                    (% of total)

 Production/Transportation/Material Moving            411 (22.7%)                    5,802 (16.8%)                   443,300 (11.8%)

 Natural Resources/
                                                      263 (14.5%)                    5,146 (14.9%)                   351,076 (9.4%)
 Construction/Maintenance

 Total                                                1,813 (100%)                   34,489 (100%)                   3,752,076 (100%)

*The project intersects Census Tracts 9711 and 9718. The statistics above represent a population-weighted average.
Source: 2022 ACS 5-Year Survey.

In support of the 2019 Final EIS, ECONorthwest performed an economic impacts analysis in 2018 and
estimated $235 million in project-related construction expenditures to be associated with $90 million in
economic contributions to the regional study area, and 300 full-time and part-time workers. Out of the 300
workers, the 2019 Final EIS states that about half would come from outside the regional study area. However,
the exact nature of how expenditures were distributed across industries and space in the analysis are unclear.

According to the 2019 Final EIS, Southern Power Company expected between eight to 10 workers to be needed
to support project O&M and could be hired locally or brought in from outside Lewis County to fill those
positions. However, the Final EIS also includes an economic impacts analysis conducted through the input-
output model IMPLAN that estimates 34 total job-years associated with $7.4 million in annual operation
expenditures. It is unclear what the explanation is for the listed discrepancy in job impacts in the 2019 Final
EIS.238

We developed a modeled estimate of job effects of the project using JEDI to evaluate the impacts of the
project on the Washington State economy (Tables B17 and B18). The JEDI model estimates the direct, as well
as the indirect (supplier) and induced (consumer spending) effects associated with project expenditures.
Table B17 presents the estimate for the Skookumchuck Wind project for the construction phase. As shown, we
estimate that project construction may have resulted in 381 full-time equivalent (FTE) jobs and contributed $69
million (2023 USD) to the State of Washington. As shown in Table B18, we also estimate annual O&M to be
associated with 21 FTE jobs and $3.7 million (2023 USD) in contributions to the State of Washington. We do
not have specific estimates of more localized job effects.

Table B17. Regional economic impacts of the Skookumchuck Wind Project in
Washington, Construction Phase

 Economic             Estimated Project Costs                   Jobs (Full-time
                                                                                         Earnings (2023 USD)             Output (2023 USD)
 Impact               (2023 USD)                                equivalents)

 Total                $209,400,000                              381                      $27,100,000                     $69,300,000

Source: IEc analysis. Project costs are estimated by taking the product of the project’s rated capacity (136.8 MW) and the onshore wind JEDI model’s
default average cost value of $1,531 per kW (including sales tax) in the State of Washington. Impacts include direct, indirect, and induced effects of
construction spending, which are assumed to include spending on labor, materials, equipment, development, and taxes. While some construction costs
are assumed to be spent in the State of Washington, equipment costs and some material costs are assumed not to be spent locally. Estimated project




238
   “Skookumchuck Wind Energy Project Proposed Habitat Conservation Plan and Incidental Take Permit for Marbled Murrelet, Bald
Eagle, and Golden Eagle Lewis and Thurston Counties, Washington: Final Environmental Impact Statement”, Anchor QEA LLC. 2019.
Prepared for U.S. Fish and Wildlife Service.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                            146
costs include both in-state and out-of-state expenditures. The JEDI model is run at the state-level, meaning any local expenditures and job estimates are
associated with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Table B18. Regional economic impacts of the Skookumchuck Wind Project in
Washington, O&M Phase, Annual
                           Operation and
                                                  Jobs (Full-time
 Economic Impact           Maintenance                                         Earnings (2023 USD)                  Output (2023 USD)
                                                  equivalents)
                           Costs (2023 USD)

 Total                     $5,400,000             21                           $1,500,000                           $3,700,000


Source: IEC analysis. O&M costs are estimated by taking the product of the project’s rated capacity (136.8 MW) and the onshore wind JEDI model’s
default average cost value of $38 per kW in the State of Washington. Impacts include direct, indirect, and induced effects of O&M spending, which are
assumed to include spending on personnel, insurance, replacement parts and equipment, taxes, and other materials and services. O&M expenditures are
assumed to be spent in the State of Washington. The JEDI model is run at the state-level, meaning any local expenditures and job estimates are
associated with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the Skookumchuck Wind Project has provided to communities.

According to communications with representatives from the Lewis County’s Community Development Office,
Southern Power Company worked with them to develop the Environmental Impact Statement. Additionally, the
two entities entered into a development agreement where revenue building permits purchased by the
developer covered the Community Development Office’s costs. The County also facilitated interactions
between Southern Power Company and its fire services regarding the former paying for the cost of mitigation
with the fire chiefs.239




239 Personal communication with Lewis County Community Development Office on March 8, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                               147
Case Study: Lund Hill Solar Project




Photo: Courtesy of Iberdrola Group


 Type of                                             Nameplate   Years of
              Location               Current Owner                            Size                      Facilities
 Project                                             Capacity    Operation

                                                                              1,080-acre solar array
 Solar                                                                                                  515,700 solar modules,
              Klickitat County, Avangrid                         2022–        within a 1,618-acre
 energy                                         150 MW                                                  substation, O&M facility,
              Washington        Renewables, LLC                  present      fenced area and 3,243-
 facility                                                                                               and 75 inverters
                                                                              acre lease area


Project Summary
Lund Hill Solar Project is a solar energy facility in Klickitat County, Washington. Project construction began in
2019 and operation commenced in November of 2022.240 The project has a capacity of 150 megawatts (MW).
Construction was led by Aurora Solar, LLC, a wholly owned subsidiary of Avangrid Renewables, LLC, both of
which are based in Portland. Avangrid Renewables, LLC is a subsidiary of Connecticut-based AVANGRID, Inc,
which in turn is owned by the Iberdrola Group, a company headquartered in Spain.241,242 Avangrid Renewables



240 “Green Direct Projects”, Puget Sound Energy. Accessed at https://www.pse.com/en/green-options/Renewable-Energy-

Programs/green-direct.
241 “Company Profile”, Avangrid. Accessed on May 30, 2024 at https://www.avangrid.com/es/aboutus/companyprofile.
242 “Corporate Headquarters”, Iberdrola. Accessed on May 30, 2024 at https://www.iberdrola.com/about-us/where-we-are/corporate-

headquarters




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        148
reached a purchase agreement with Puget Sound Energy (PSE) in 2019 to supply PSE’s innovative renewable
energy program, Green Direct, with 100% of the project’s energy output.243 Initially, 41 customers subscribed to
the Green Direct program in 2019, then 18 additional customers were added in March 2021, for a total of 59
customers receiving power from the Green Direct program, generated by facilities including Lund Hill.244

The project lease area is approximately 3,243 acres and intersects 12 land parcels, eight of which are owned
by local businesses (LLCs), three by individuals, and one by the Washington State Department of Natural
Resources (WDNR). Prior to the project, most of the project area outside the project fence line was and
continues to be used as rangeland and undeveloped open space. As shown in Figure B14 below, solar panels
occupy portions of seven land parcels that encompass 1,080 acres (estimated using satellite imagery), or 33.3
percent of the total lease area. The project fence line, which surrounds the panels, encompasses 1,618 acres
(49.9 percent of the total lease area). The fence line does not exactly follow parcel lines, and as a result there
are several parcels where only a portion of the parcel is within the fence line.

Over two thirds of Klickitat County, including the project area, is contained within the county’s Energy Overlay
Zone (EOZ). The County established the EOZ in 2005 to provide an expedited pathway for development of
renewable energy projects. Within the EOZ, this zone, developers can bypass county zoning applications and
approvals because economic and environmental impact analyses have already been completed for the entire
EOZ area.245,246




243 “Avangrid Renewables and PSE Announce Largest Solar Project in Washington”, Avangrid, October 31, 2019. Accessed on May 21,

2024 at https://www.avangrid.com/es/w/avangrid-renewables-and-pse-announce-largest-solar-project-in-washington.
244 “Green Direct Projects”, Puget Sound Energy. Accessed on May 21, 2024 at https://www.pse.com/en/green-options/Renewable-

Energy-Programs/green-direct.
245 “Klickitat County’s Energy Overlay Zone Streamlines Future Siting of Energy Projects”, Institute for Local Self-Reliance. July 6, 2005.

Accessed on May 21, 2024 at https://ilsr.org/klickitat-countys-energy-overlay-zone-streamlines-future-siting-energy-projects/.
246
    “Energy Overlay Zone wins county approval”, Columbia Gorge News, March 17, 2005. Accessed on May 29, 2024 at
https://www.columbiagorgenews.com/archive/energy-overlay-zone-wins-county-approval/article_5cf3206c-aacc-5c2c-9edc-
aa3a322770e9.html


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  149
Figure B14. Lund Hill Solar Project lease area in Klickitat County, WA (Washington
State Geospatial Portal,247 Lund Hill Solar Project Energy Overlay Zone Application248)




Geographic Location/Community Context
Klickitat County is a rural county, located along the border between Washington and Oregon, with a population
of 23,271 in 2022. 249 The project is located about 10 miles southeast of the 92-person incorporated
community of Bickleton and 30 miles east of Goldendale, the county seat, which has a population of 3,453. The
county government employs 229 full-time and 24 part-time employees and has an annual budget of $59.5
million as of 2023.250,251




247 Washington State Geospatial Portal, Property Parcel data, updated February 7, 2024. Accessed on February 12, 2024 at

https://geo.wa.gov/datasets/wa-geoservices::current-parcels/about.
248 Lund Hill Solar Project Energy Overlay Zone Application, Tetra Tech, October 2018.
249 2022 ACS 5-Year Survey, U.S. Census Bureau.
250 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
251 2023 Annual Budget. Klickitat County.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                     150
Table B19 summarizes community population statistics for the project area. As shown, the population in
Klickitat County has a lower median income, higher population living below the poverty level, higher population
over 65, and a higher energy burden than the state population overall.

Klickitat County is home to more operating and planned utility-scale clean energy projects than most other
counties in Washington; Lund Hill is just one of these projects. Existing wind projects include Linden Ranch
Wind Farm (58 MW), Hoctor Ridge Wind Farm (60 MW), Harvest Wind (100 MW), Windy Flats (190 MW), White
Creek (206 MW), Windy Point I (242.5 MW) and II (130 MW), Big Horn Wind Farm (249.5 MW), Windy Flats (190
MW), and Juniper Canyon (250 MW). Most of these projects were permitted between 2003 and 2008.252
Juniper Canyon is one of the largest of these projects at 128 turbines with a combined capacity of 250
megawatts and is located just east of Lund Hill.253 Big Horn Wind Farm, with a capacity of 249.5 MW and 133
turbines, is also located nearby. Nine turbines from Big Horn Wind Farm overlap with the northern portion of
the Lund Hill lease area outside the fenced area, which could potentially limit determination of the direct
impacts of Lund Hill’s presence in this area. Bluebird Solar Project, which is also developed by Aurora Solar
and has not yet begun construction, has a planned capacity of 100 megawatts.254 Carriger Solar Project, a
1,150-megawatt solar farm, is expected to complete construction in 2025.

Table B19. Community population statistics for Lund Hill Project Area (2018 - 2022).
                                        Census tracts intersected by
Metric                                                                   Klickitat County            State of Washington
                                        projecta

Population (2022)                       1,630                            22,798                      7,688,549

10-Year Population Change (2012 –
                                        N/A                              +11.6%                      + 14.1%
2022)

Median Household Income                 $59,792                          $66,581                     $90,325

Population identifying as other than
                                        24.3%                            19.8%                       34.5%
white and non-Hispanic

Population with income below federal
                                        7.1%                             13.8%                       9.9%
poverty level

Population with less than high school
                                        9.2%                             10.6%                       7.9%
diploma or equivalent

Population that is unemployed           1.5%                             3.7%                        3.2%

Population without health insurance     15.1%                            12.2%                       9.2%

Population over 65 years old            29.3%                            24.4%                       16.0%

Population with low English
                                        8.3%                             4.9%                        7.7%
proficiency

Energy burden b                         2.6%                             2.6%                        1.5%




252 “Wind Projects”, Klickitat County Washington, February 8, 2022. Accessed on May 30, 2024 at http://klickitatcounty.org/273/Wind-

Projects.
253 “Juniper Canyon Wind Farm”, Renewable Technology. Accessed on May 21, 2024 at https://www.renewable-

technology.com/projects/juniper-canyon-wind-farm/.
254 “EIS Comment Period Ends for Planned Avangrid Solar Project in Klickitat County”, NewsData, February 11, 2022. Accessed on May

21, 2024 at https://www.newsdata.com/clearing_up/briefs/eis-comment-period-ends-for-planned-avangrid-solar-project-in-klickitat-
county/article_5bb4892a-8b68-11ec-b7d1-aba443f902f6.html.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            151
a
 The project intersects Census Tract 9501.01
b
 Energy burden is defined as the percentage of gross household income spent on energy cost.
Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.255

As shown in Figure B15, approximately 70.3 percent of Klickitat County lands are privately owned; 12.9 percent
are lands of the Yakama Nation, with the remaining lands including federal lands (18.9 percent), state lands
(10.1 percent), and county or locally owned lands (less than one percent).256

The primary commodities produced in Klickitat County vary: in the west, unmanned aerial vehicles, wood
products, and fruit crops; in the center, windsurfing and kite boarding beaches; in the east, vegetable crops and
the regional landfill. Agriculture is present across the county, with fruits, tree nuts, berries, and wine grapes
being the most profitable crops. Agriculture and forestry industries are major employers in the county.257




255 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.
256 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
257 “Klickitat County Profile”, Employment Security Department of Washington State, updated July 2022. Accessed on May 21, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/klickitat.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          152
Figure B15. Land ownership in Klickitat County, Washington.258




258 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B .


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          153
Land Use
Figure B16. Land use surrounding panels in portion of Lund Hill Solar Project area
(Google Earth, 2023).




THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Lund Hill Solar
Project on land uses within the project lease area and discuss the likelihood of other potential effects on
nearby land uses.

Most of the land within the project lease area is grassland, pasture, and scrub. The project footprint itself
contained no cropland acreage prior to project development.259,260

This analysis suggests that the main source of profit from this land is likely derived from its use as pasture.
Approximately 927 acres land classified as “other” is scrubland; the remaining 687 acres are most likely used
as either open space or rangeland. In 2023, average rent for pasture in Washington was $9 per acre, per




259 2016 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on May 3, 2024 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.
260 2023 Cropland Data Layer, United States Department of Agriculture (USDA) and National Agricultural Statistics Service (NASS).

Accessed on May 5, 2023 at https://www.nass.usda.gov/Research_and_Science/Cropland/Release/index.php.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              154
year.261 To the extent that the entire 687 acres were used as a rangeland prior to the project development, this
suggests an annual revenue to landowners of $6,200.

Table B20. Land use acres within project footprint before (2016) and after project
(2023) construction.
 Project Footprint Area                         Pre-project, 2016                         Post-Project, 2023
 (Area Within Fenceline)                        (Acres, percent of total)                 (Acres, percent of total)

 Crops                                          0 (0.0%)                                  0 (0.0%)

 Developed                                      3 (0.0%)                                  1,618 (100%)

 Other                                          1,615 (100%)                              0 (0.0%)

 Total                                          1,618 (100%)                              1,618 (100%)

Source: USDA 2016 Land Cover Data,262 USDA 2023 Cropland Data.263


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates what we can
determine about the effects of Lund Hill Solar Project on landowners in Klickitat County.

As is common practice with solar energy project development in rural areas, land parcels in the Lund Hill Solar
Project area are leased to the project owner while retaining their original land ownership status. The parcels
without panels continue to be zoned as agricultural; under Washington’s Current Use taxation laws,
landowners receive a tax break for using land for agricultural purposes as long as compatible incidental uses
(including solar panels) do not exceed 20 percent of the classified land.264 While developers indicate that
agricultural activities such as growing strawberries or grazing sheep can continue under the panels in order to
reap the property tax benefits of this law, farmers in Klickitat County have not effectively used land with solar
panels for agricultural purposes given current designs.265 As a result, parcels in the project footprint have not
been able to maintain their agricultural land use designation and are thus charged a penalty fee encompassing
20 percent of the property value plus seven years of back taxes.266 Per the tax records listed in the Klickitat



261 2023 Cash Rent Per Acre, Pasture in Washington State. United States Department of Agriculture (USDA) National Agricultural

Statistics Service (NASS). Updated August 2023. Accessed May 31, 2024 at https://quickstats.nass.usda.gov/.
262 2016 Land Cover, National Land Cover Database (NLCD), Multi-Resolution Land Characteristics (MRLC) Consortium. Accessed May

23, 2023 at https://www.mrlc.gov/.
263 2022, 2023 Cropland Data Layer. United States Department of Agriculture (USDA) National Agricultural Statistics Service (NASS).

Accessed June 22, 2023 at https://datagateway.nrcs.usda.gov/.
264 “Do You Qualify For Reduced Property Taxes? Current Use Taxation”, WSU Extension Clark County, 2014. Accessed on May 30, 2024

at https://s3.wp.wsu.edu/uploads/sites/2079/2014/04/current-use-15.pdf.
265 Personal communication with Klickitat County Assessor’s Office on March 8, 2024.
266 “Do You Qualify For Reduced Property Taxes? Current Use Taxation”, WSU Extension Clark County, 2014. Accessed on May 30, 2024

at https://s3.wp.wsu.edu/uploads/sites/2079/2014/04/current-use-15.pdf




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           155
County Property Search, all parcels with panels taking up over 20 percent of the parcel area were charged a
one-time fee of $4,200 to 7,000 per parcel in 2021.267 Though the fee is technically charged to the landowner,
county officials believe that the developer likely covered the cost avoiding any additional financial burden for
the landowner.268

Property owners within the leased areas typically enter into lease agreements with the project owners for a
pre-development period (typically ranging from two to five years in duration). After the design of the project is
established, landowners of parcels on which physical infrastructure is developed are further compensated on a
per acre basis at an established fee. While these agreements are generally confidential to the parties engaged,
agreements made with public entities are sometimes made public and can provide insights into these
payments. One such lease agreement is publicly available for a single 480-acre parcel in the Lund Hill Solar
Project area owned by the WDNR.269 Under this agreement, payments change throughout the lifecycle of the
project. Specifically:

    1. Predevelopment & Construction: The State is paid $50,000 up front, plus $5,000 annually, increasing by
       $1,000 annually after the second year of pre-development/construction. The State is additionally paid
       $2 per acre for non-developed acreage.
    2. Operations: The State is paid $300 per acre in years 1-10, $350 per acre in years 11-20, and $400 per
       acre for years 21-40. If the project is terminated before the 15th year of the lease, the project owner will
       pay the State a one-time fee based on years elapsed.

The project was approved in September 2019. Construction began in 2019 and ended in November 2022, with
the project becoming commercially operable in February 2023.270,271,272 Assuming a four-year pre-development
period, and a three-year construction period, we estimate the payments to the WDNR for this parcel to be
$100,000 during the predevelopment and construction phases.273 Assuming that all 480 acres were developed
and that the project continues past the 15th year of the lease, the lease would provide DNR with approximately
$144,000 annually for years 1 through 10, $168,000 annually for years 11 through 20, and $192,000 annually
for years 21 through 40.

To the extent that landowner payments to WADNR are reflective of the market for private parcels,274 total lease
payments to property owners for the entire lease area (including WADNR’s parcel) would be $484,400 annually
for years 1through 10, increasing to $566,300 annually for years 11 through 20 and $647,200 annually for years
21 through 40. Given the estimated pasture rent of $6,200 per year, these lease payments would represent a


267 Klickitat County Property Search. Accessed on April 15, 2024 at http://www.klickitatcountytreasurer.org/PropertySearch.aspx.
268 Personal communication with Klickitat County Planning Department on March 11, 2024.
269 Lund Hill Solar Power Development Lease, 2019. Provided by WA DNR on March 25, 2024.
270 “Green Direct Projects”, Puget Sound Energy. Accessed on May 21, 2024 at https://www.pse.com/en/green-options/Renewable-

Energy-Programs/green-direct.
271 Lund Hill Solar Energy Project approval memorandum, Klickitat County Planning Department, September 19, 2019.
272 “AVANGRID’s Lund Hill, Washington State’s Largest Utility-Scale Solar Farm, Achieves Commercial Operation”, Avangrid, February

28, 2023. Accessed on April 3, 2024 at https://www.avangrid.com/w/avangrid-s-lund-hill-washington-state-s-largest-utility-scale-solar-
farm-achieves-commercial-operation.
273 Lund Hill Solar Power Development Lease, 2019. Provided by WA DNR on March 25, 2024.
274 While it is difficult to directly compare leases given the variety of factors likely considered in individual agreements, publicly available

estimates provide similar annual values. BLM rents range from $18.61 per acre up to $62,000 per acre depending on the zone with a
median of $400 per acre in zone 8. Klickitat is zone 4 where the rent is $106 per acre in 2023 from BLM
(https://www.blm.gov/sites/default/files/policies/IM2021-005_att5.pdf, https://www.blm.gov/sites/default/files/policies/IM2021-
005_att1_0.pdf). The Strategic Solar Group lists a broad range of $300 to $2,000 per acre as a standard range, noting that a variety of
factors, including proximity to a substation influence the leasing rate (https://strategicsolargroup.com/what-is-the-average-solar-farm-
lease-rate/). They note that in California’s Central Valley leases are typically around $1,000 per acre.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                     156
notable increase in revenues for landowners over renting the land as pasture. Even if all the scrubland was also
rented as pasture (i.e., $9 rent on 1,618 acres totaling $14,600 annually), landowners would increase their
revenues by $470,000 in years 1 through10 from lease payments.

Table B21. Estimated WADNR payments for project lease area.

                                                                                                                              All Acres (DNR Rate)
 Year                                   Value                                                     WA DNR Total
                                                                                                                              Total

 Year 1 (Predevelopment)                $50,000 initial payment + $5,000 rent                     $55,000                     *

 Year 2 (Predevelopment)                $5,000 rent                                               $5,000                      *

 Year 3 (Predevelopment)                $6,000 rent                                               $6,000                      *

 Year 4 (Predevelopment)                $7,000 rent                                               $7,000                      *

 Year 5 (Construction)                  $8,000 rent                                               $8,000                      *

 Year 6 (Construction)                  $9,000 rent                                               $9,000                      *

 Year 7 (Construction)                  $10,000 rent                                              $10,000                     *

 Year 8 – 17 (Operations)               $300 per acre                                             $144,000/year               $484,400/year

 Year 18 – 27 (Operations)              $350 per acre                                             $168,000/year               $566,300/year

 Year 28 – 47 (Operations)              $400 per acre                                             $192,000/year               $647,200/year

* Payments for the entire project are not estimated prior to operations since they are not at a specific scale (e.g., per acre). Sources: Solar Power
Development Lease (2019)

We also evaluated assessed values of the parcels within the project lease area prior to and following Lund Hill
Solar Project construction. As shown, parcels in the project footprint and parcels in the parcel lease area had
similar assessed values on a per acre basis prior to project implementation. Though parcel values were slightly
lower in the project footprint generally, the average value of a parcel in the project footprint exceeded that of a
parcel within the lease area but outside the project footprint in 2021, the year before the project became
operational. Following the conclusion of project construction in November 2022, we observed similar or
slightly increased property values, which averaged $82,357 for parcels within the project footprint and $82,002
for parcels within the lease but outside the footprint in 2023.275




275 Klickitat County Property Search. Accessed on April 15, 2024 at http://www.klickitatcountytreasurer.org/PropertySearch.aspx.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                  157
Figure B17. Assessed property values of Lund Hill Solar Project leased areas over
time (2023 dollars).




Source: Klickitat County Property Search, 2016-2024. Standard deviation of average per property values for all properties in footprint and lease area.
Accessed on April 15, 2024 at http://www.klickitatcountytreasurer.org/PropertySearch.aspx


Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Since construction, Lund Hill Solar taxes have been assessed by Klickitat County, as the project footprint is
entirely within Klickitat County.276,277 The leased land is assessed and taxed as utility and industrial property,
though the land is still zoned for agriculture, while all equipment, structures, and construction costs are
assessed and taxed as personal property. The assessed value of the personal property for the project is
approximately $148.2 million 2023 USD in 2024. Assuming a typical project depreciation of four percent per
year as described below, the initial assessed value was likely to have been $156.8 million in 2023.

While the project applicant was Aurora Solar, LLC, taxes are paid by the parent entity, Avangrid Renewables.
Personal property tax payments initiated post-construction in 2023 at about $1 million. Because the assessed
value of the infrastructure is anticipated to depreciate over time, the personal property tax payments made to
the county are anticipated to decline over time. Although improvements to the project may alter the schedule,
the depreciation is anticipated to decline at a rate that is approximately consistent with the published state



276 Personal communication with Klickitat County Assessor’s Office on March 8, 2024.
277 Personal communication with Washington State Department of Revenue on March 25, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                   158
schedule of four percent for utility-scale renewable energy development.278 Based on this schedule, the project
would depreciate to 50 percent ($78.4 million) of its original value by Year 12 and 15 percent ($23.5 million) by
Year 22 where it would be constant for the remaining life of the project. This reduction in assessed value
would result in proportional reductions of personal property tax payments (e.g., to $170,000 in Year 22) using
the current tax levies and valuation guidelines.

The annual real property taxes on the leased parcels are paid by the developer, Avangrid Renewables, as a part
of the contract between the developer and the landowners of leased parcels.279 As shown in Table B22, real
property tax payments from the project parcels occurred in 2019 through today with a notable increase in 2021
due to the change in current use designation, as described above. This change in classification is also likely
the cause of the observed increase in real property value and associated taxes in most recent years.

The sale of machinery and equipment also generated sales tax revenue for both the state and county. Klickitat
County had a one percent sales tax rate in 2023; combined with the state’s 6.5 percent tax rate, the overall
sales tax levy was 7.5 percent in 2023. As such, the sales tax on materials and equipment for the project are
estimated to have generated approximately $7.4 million (2023 USD) in total state and county sales tax (based
on a total sales figure of approximately $99 million).280 However, because there is a 75 percent state
exemption for sales tax for renewable energy projects, projects may submit receipts to the state for
reimbursement.281 This means that after initially paying the sales taxes, the state and county will return
revenues to the projects. In this case, final sales tax payments are likely to have been closer to $1 million, of
which approximately $250,000 were retained by the County. 282 The project will continue to generate sales tax
revenue on a periodic basis, whenever project machinery or equipment is replaced or refurbished.

Table B22. Lund Hill solar project tax payments to Klickitat County, 2019 – 2024.
          Real          Estimated                                                   Total Project     Total County          % of
Tax                                         Total Project       Total County Tax
          Property      Personal                                                    Collections (2023 Taxes Collected       County Tax
Year*                                       Collections         Collected
          Tax           Property Tax**                                              dollars)          (2023 dollars)        Roll

2019      $3,973        --                  $3,973              $67,958,566         $4,749              $81,233,932         0.01%

2020      $3,989        --                  $3,989              $76,852,548         $4,689              $90,348,701         0.01%

2021      $45,478       --                  $45,478             $85,659,448         $52,768             $99,390,229         0.05%

2022      $7,811        --                  $7,811              $90,183,189         $8,666              $100,051,394        0.01%

2023      $5,640        $1,028,690          $1,034,330          $101,167,788        $1,072,030          $104,855,253        1.02%




278 Personal Property Valuation Guidelines, Washington State department of Revenue. Accessible at: https://dor.wa.gov/taxes-

rates/property-tax/personal-property-valuation-guidelines
279 Personal communication with Klickitat County Assessor’s Office on March 8, 2024; Lund Hill Solar Power Development Lease, 2019.

Provided by WA DNR on March 25, 2024.
280 IEc analysis. We assume qualified expenditures that would generate sales taxes include material and equipment cost categories

specified in the solar photovoltaic JEDI model. Costs for each category are estimated by first taking the product of the project’s rated
capacity (150 MW) and the solar photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) in the
State of Washington, then by distributing the estimate by the default proportions of total costs for each cost category.
281 The sales tax exemption was modified in 2019 to allow for a refund of 50%, 75%, or 100% of the state and local sales tax paid on

machinery, equipment, and labor and services related to the installation of certain renewable energy systems purchased or installed
after January 1, 2020. Depending on the source of their involved workforce, project owners may qualify for one of the three available
tiers of this exemption. Due to data limitations, we are unable to allocate total sales tax collections to individual refund tiers and
assume 75% of local sales tax paid on qualified expenditures are refunded to project owners.
282 The timing of the repayment of the county taxes has been highlighted as difficult for County Assessors to anticipate, particularly as

the value of project sales are not specifically reported to the counties.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               159
           Real            Estimated                                                            Total Project     Total County               % of
 Tax                                              Total Project          Total County Tax
           Property        Personal                                                             Collections (2023 Taxes Collected            County Tax
 Year*                                            Collections            Collected
           Tax             Property Tax**                                                       dollars)          (2023 dollars)             Roll

 2024      $7,115           $987,542              $994,657               --                     $994,657               --                     --

                                                                                                                                             0.22%
 Total     $74,006         $2,016,232             $2,090,238             $421,821,539           $2,137,559             $475,879,509
                                                                                                                                             (avg)

*Tax year refers to the year that taxes were collected, not the year in which the activities that incurred the taxes were conducted; e.g. in Tax Year 2024,
taxes were collected for activities from calendar year 2023.
**Personal property assigned to Lund Hill: 56-00-0022-0011/00 (2023), 56-00-2022-0011/00 (2024). The 2023 personal property page was unavailable;
thus, all 2023 values are estimated based on 2024 values and standard depreciation estimates.
Sources: Klickitat County Property Search, accessed on May 9, 2024 at http://www.klickitatcountytreasurer.org/propertysearch.aspx, Washington State
Department of Revenue Property Tax Statistics, 2019-2023. Accessed March 2024.


Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have
gathered about the extent of impacts that project construction and operations have had on employment in
Klickitat County.

Direct Investments
We estimate total Lund Hill Solar Project costs using the Jobs and Economic Development Impact (JEDI)
input-output model built by NREL for solar photovoltaic energy development. For this estimate, we use the
model assumption that solar photovoltaic energy project installation and capital expenditure costs are $1,030
per kW in the State of Washington. Similarly, we assume that project operation and maintenance (O&M) costs
are $20 per kW of installed capacity. Using these assumptions, we estimate total Lund Hill Solar Project
construction and installation costs to be approximately $154.5 million. Annual O&M costs are estimated to be
$3 million.283

Employment
Table B23 presents occupations of residents within the project lease area census tract, Klickitat County, and
the State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are high in the relevant census tract (25 percent) as well as
Klickitat County (16 percent) when compared with the Washington State average (9.4 percent).

Table B23. Occupation of residents on and nearby the Lund Hill Solar Project, 2018 -
2022.
                                                       Employment in Census             Employment in Klickitat         Employment in State of
 Occupation                                            tracts intersected by            County                          Washington
                                                       project* (% of total)            (% of total)                    (% of total)

 Management/Business/Science/Arts                      246 (38.9%)                      4,211 (44.1%)                   1,664,322 (44.4%)

 Sales/Office                                          104 (16.4%)                      1,392 (14.6%)                   697,384 (18.6%)

 Service                                               54 (8.5%)                        1,370 (14.4%)                   595,994 (15.9%)



283
   According to Avangrid Renewables, the Lund Hill photovoltaic plant “required an investment of more than $100 million.” “Lund Hill,
Washington’s biggest solar project,” Iberdrola, Accessed at https://www.iberdrola.com/about-us/what-we-do/solar-photovoltaic-
energy/lund-hill-photovoltaic-plant#2.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                 160
                                                       Employment in Census           Employment in Klickitat        Employment in State of
 Occupation                                            tracts intersected by          County                         Washington
                                                       project* (% of total)          (% of total)                   (% of total)

 Production/Transportation/Material Moving             73 (11.5%)                     1,094 (11.5%)                  443,300 (11.8%)

 Natural Resources/
                                                       156 (24.6%)                    1,480 (15.5%)                  351,076 (9.4%)
 Construction/Maintenance

 Total                                                 633 (100%)                     9,547 (100%)                   3,752,076 (100%)

*The project intersects Census Tract 9501.01. Source: 2022 ACS 5-Year Survey.

We developed a modeled estimate of job effects of the project using JEDI to evaluate the impacts of the
project on the Washington State economy (Tables B24 and B25). The JEDI model estimates the direct, as well
as the indirect (supplier) and induced (consumer spending) effects associated with project expenditures.
Table B24 presents the estimate for the Lund Hill Solar project for the construction phase. As shown, we
estimate that project construction may have resulted in 681 full-time equivalent (FTE) jobs and contributed $95
million (2023 USD) to the State of Washington. As shown in Table B25, we also estimate annual O&M
expenditures to be associated with 37 jobs (FTE) and $4.1 million (2023 USD) in sales contributions to the
State of Washington.

Table B24. Regional economic impacts of the Lund Hill Solar Project in Washington,
Construction Phase
 Economic              Estimated Project Costs                   Jobs (Full-time
                                                                                          Earnings (2023 USD)             Output (2023 USD)
 Impact                (2023 USD)                                equivalents)

 Total                 $154,500,000                              681                      $46,100,000                     $95,300,000

Source: IEC analysis. Project costs are estimated by taking the product of the project’s rated capacity (150 MW) and the solar photovoltaic JEDI model’s
default average cost value of $1,030 per kW (including sales tax) in the State of Washington. Impacts include direct, indirect, and induced effects of
construction spending, which are assumed to include spending on labor, materials, equipment, permitting, and taxes. Materials and equipment costs are
assumed to be spent out of state. Other estimated project costs include both in-state and out-of-state expenditures. The JEDI model is run at the state-
level, meaning any local expenditures and job estimates are associated with in-state impacts and not impacts at finer spatial scales (e.g., county,
municipality). FTEs have a duration of one year.


Table B25. Regional economic impacts of the Lund Hill Solar Project in Washington,
O&M Phase, Annual
                           Operation and
                                            Jobs (Full-time
 Economic Impact           Maintenance                                       Earnings (2023 USD)                   Output (2023 USD)
                                            equivalents)
                           Costs (2023 USD)

 Total                     $3,000,000             37                         $2,300,000                            $4,100,000

Source: IEC analysis. O&M costs are estimated by taking the product of the project’s rated capacity (150 MW) and the solar photovoltaic JEDI model’s
default average cost value of $20 per kW in the State of Washington. O&M spending is assumed to include labor, materials, equipment, and other
services. Impacts include direct, indirect, and induced effects of this spending. O&M expenditures are assumed to be spent in the State of Washington.
The JEDI model is run at the state-level, meaning any local expenditures and job estimates are associated with in-state impacts and not impacts at finer
spatial scales (e.g., county, municipality). FTEs have a duration of one year.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                              161
Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the project has provided to communities.

According to the Klickitat County Assessor’s Office, the project’s benefits to the community are limited to its
county and local taxing district property tax payments, including the Road Fund, School District, and Fire
District.284




284 Personal communication with Klickitat County Assessor’s Office on March 8, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                        162
Case Study: Horn Rapids Solar, Storage, & Training Project




Photo: Courtesy of Energy Northwest



 Type of                                       Nameplate   Storage    Years of
                Location       Current Owner                                      Size         Footprint   Facilities
 Project                                       Capacity    Capacity   Operation

                                                                                                           1 solar array
                               Tucci Energy
 Solar,                                                                           73 leased                of 11,400
              Benton           Services (solar);
 storage, and                                                         2020–       acres on 2               panels, battery
              County,          Energy            4 MW      1 MW                                20 acres
 training                                                             present     land                     storage,
              Washington       Northwest
 facility                                                                         parcels                  training
                               (battery)
                                                                                                           facilities


Project Summary
Horn Rapids Solar, Storage & Training Project (HRSST) is a four-megawatt (MW) capacity solar facility in
Benton County, Washington with an additional one MW battery storage capacity. The Horn Rapids site also
includes a training facility, where solar and battery storage technicians can receive education on related topics
such as plant construction, operations, maintenance, and safety. This facility includes training classrooms and




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                            163
30 acres of transmission and distribution equipment for training purposes. Construction began in February
2020; by November 2020, the project was operating.285

Construction and engineering were led by Potelco Inc. The solar portion of the project is owned and operated
by Tucci Energy Services, who have a 25-year Power Purchase Agreement with the City of Richland. The energy
generated and stored at HRSST is used to level energy loads in Richland during peak hours. Energy Northwest,
the City of Richland, and Pacific Northwest National Laboratories collaborate to research and optimize energy
storage at the facility. 286 The land is owned by the International Brotherhood of Electrical Workers (IBEW),
Local 77, and leased to the project owner.287

The project lease area is 73 acres, with the solar panels occupying 20 acres of this area. As Figure B1 shows,
the project lease area intersects two land parcels. The Battery Energy Storage System (BESS) is located on the
southeastern corner of the solar array and is circled in red on the map below. Construction and engineering
were led by Potelco Inc. The solar portion of the project is owned and operated by Tucci Energy Services, who
have a 25-year Power Purchase Agreement with the City of Richland. The energy generated and stored at
HRSST is used to level energy loads in Richland during peak hours. Energy Northwest, the City of Richland, and
Pacific Northwest National Laboratories collaborate to research and optimize energy storage at the facility. 288
The land is owned by the International Brotherhood of Electrical Workers (IBEW), Local 77, and leased to the
project owner.289

The project lease area is 73 acres, with the solar panels occupying 20 acres of this area. As Figure B18 shows,
the project lease area intersects two land parcels. The Battery Energy Storage System (BESS) is located on the
southeastern corner of the solar array and is circled in red on the map below.




285 “Horn Rapids Solar, Storage, & Training Project”, Energy Northwest. Accessed on April 29, 2024 at https://www.energy-

northwest.com/energyprojects/horn-rapids/Pages/default.aspx.
286 “Horn Rapids Solar Farm”, Potelco Inc. Accessed on April 19, 2024 at https://www.potelco.net/projects/horn-rapids-solar-farm/.
287 “New Energy Project Powers Up in Richland”, Energy Northwest. November 9, 2020. Accessed on April 29, 2024 at

https://www.energy-northwest.com/whoweare/news-and-info/Pages/New-energy-project-powers-up-in-Richland.aspx.
288
    “Horn Rapids Solar Farm”, Potelco Inc. Accessed on April 19, 2024 at https://www.potelco.net/projects/horn-rapids-solar-farm/.
289 “New Energy Project Powers Up in Richland”, Energy Northwest. November 9, 2020. Accessed on April 29, 2024 at

https://www.energy-northwest.com/whoweare/news-and-info/Pages/New-energy-project-powers-up-in-Richland.aspx.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               164
Figure B18. Horn Rapids Project in Benton County, WA (Washington State Geospatial
Portal290)




290 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at https://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          165
Geographic Location/Community Context
HRSST is in Benton County, a county with a population of 212,791 as of 2022, making it the 10th most
populous county in Washington. Benton County is located at the confluence of the Yakima, Snake, and
Columbia rivers. The project is located on the northern boundary of Richland, Washington. Richland has a
population of 62,821 as of 2022 and is the second most populous city in the county, second to the 84,750-
person city of nearby Kennewick.291 The County government employs 594 full time and 20 part-time individuals
and has a biennial budget of $497.6 million as of the 2023-2024 term.292,293

Table B26 summarizes community population statistics for the project area. As shown, the population in
Benton County has a higher population without health insurance (12.7 percent) and a somewhat higher
population with less than a high school diploma or equivalent (9.9 percent) relative to the state population
overall (9.2 percent and 7.9 percent, respectively).

HRSST is one of two operating utility-scale clean energy projects in Benton County. The second project,
Columbia Generating Station, is a 1,207-MW nuclear power plant constructed in 1984.294 Multiple other utility-
scale clean energy projects, including Horse Heaven Wind Farm, Wautoma Solar Energy Project, and Hop Hill
Solar, have been proposed to be built in Benton County and are at various stages of permitting and
development.295

Table B26. Community population statistics for Horn Rapids Project Area
(2018 - 2022).
                                          Census tracts intersected by
Metric                                                                     Benton County                 State of Washington
                                          projecta

Population (2022)                         6,128                            207,560                       7,688,549

10-Year Population Change (2012 –
                                          +48.6%                           +18.3%                        +14.1%
2022)

Median Household Income                   $104,861                         $83,778                       $90,325

Population identifying as other than
                                          22.6%                            32.6%                         34.5%
white and non-Hispanic

Population with income below federal
                                          3.5%                             10.5%                         9.9%
poverty level

Population with less than high school
                                          2.4%                             9.9%                          7.9%
diploma or equivalent

Population that is unemployed             3.5%                             3.0%                          3.2%

Population without health insurance       9.3%                             12.7%                         9.2%




291 2022 ACS 5-Year Survey, U.S. Census Bureau.
292 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
293 “2023-2024 Final Budget”, Benton County. November 29, 2022.
294 “Columbia Generating Station produces record amount of energy in 2022”, Energy Northwest. February 9, 2023. Accessed on April

29, 2024 at https://www.energy-northwest.com/whoweare/news-and-info/Pages/Tri-Cities-nuclear-power-plant-produces-record-
amount-of-energy-for-Northwest.aspx.
295 “Energy Facilities”, Energy Facility Site Evaluation Council. Accessed on April 29, 2024 at https://www.efsec.wa.gov/energy-facilities.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                166
                                              Census tracts intersected by
    Metric                                                                         Benton County                    State of Washington
                                              projecta

    Population over 65 years old              16.8%                                15.4%                            16.0%

    Population with low English
                                              4.1%                                 8.2%                             7.7%
    proficiency

    Energy burden b                           1.6%                                 1.7%                             1.5%

a
  The project intersects Census Tract 120; this census tract has a population of zero, so this analysis focuses on Census Tract 102.01, which is
immediately adjacent to the project site.
b
  Energy burden is defined as the percentage of gross household income spent on energy cost.
Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.296

As shown in Figure B19, approximately 42.9 percent of Benton County is publicly owned, with nearly 75
percent of the public lands being federally managed, 9.7 percent state, and about one percent county or locally
owned lands.297 Agriculture is important to the local economy, particularly with the relatively recent growth of
the wine industry. Benton County is also home to the Hanford Nuclear Reservation, which brought many skilled
engineers and scientists to the area and contributed to a strong economic basis in energy production and
medical equipment manufacturing. Recreational and tourism industries are also developing in the county. 298




296 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.
297 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
298 “Benton County Profile”, Employment Security Department of Washington State. March 2022. Accessed on April 29, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/Benton.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             167
Figure B19. Land ownership in Benton County, Washington.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   168
Figure B20. Land use surrounding solar array in Horn Rapids Project area (Google
Earth, 2023).




Land Use
THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Horn Rapids Solar,
Storage & Battery Project on land uses within the project lease area and discuss the likelihood of other
potential effects on nearby land uses.

No crops have been grown within the project lease area in the recent past as the land was unusable for
agricultural purposes, likely to it its proximity to the Hanford Nuclear Reservation.299 It is currently zoned as
educational land and has been developed since the turn of the century. As the project utilized previously
unproductive land, it had no impact on local crop production, thus we conclude that revenue from previous
alternative land use was unaffected by the project’s installation.

Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be


299 Personal communication with Benton County Treasurer’s Office on March 11, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                              169
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates what we can
determine about the effects of Horn Rapids Solar, Storage & Training Project on landowners in Benton
County.

As is common practice with clean energy project development in rural areas, land parcels in the HRSST project
area are leased by the project owner and most retain their original land ownership status. The land is owned by
IBEW-77, with leases to Energy Northwest (ENW) and Tucci.300 Property owners within the leased areas
typically enter into lease agreements with the project owners for a pre-development period (typically ranging
from two to five years in duration). After the design of the project is established, landowners for which physical
infrastructure is developed are further compensated on a per acre basis at an established fee. While these
agreements are generally confidential to the parties engaged, some agreements made with public entities are
made public that provide insights into these payments. We have been unable to locate specific lease
agreements for this site.

Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Our understanding is that the Horn Rapids site is tax exempt due to its status as an educational facility.301
However, even though there is no real or personal property tax applied to the project, the sale of machinery and
equipment does generate sales tax revenue for both the State and county. Benton County had a 2.2 percent
sales tax in 2022; combined with the state 6.5 percent rate, the overall levy totals to 8.7 percent sales tax. This
sales tax on materials and equipment associated with the solar photovoltaic component of the project would
generate approximately $630,000 (2023 USD) in sales tax (based on a total sales figure of approximately $7.2
million).302 However, based on a 75 percent state exemption for renewable energy, payments would be closer
to $160,000, of which approximately $40,000 would go to the County.303 The project will continue to generate
sales tax revenue on a periodic basis, whenever project machinery or equipment is replaced or refurbished.
Due to data limitations, we are unable to estimate potential sales tax revenues associated with the battery
energy storage system component of the project.




300 “New Energy Project Powers Up in Richland”, Energy Northwest. November 9, 2020. Accessed on April 29, 2024 at

https://www.energy-northwest.com/whoweare/news-and-info/Pages/New-energy-project-powers-up-in-Richland.aspx.
301 Personal communication with Benton County Treasurer’s Office on March 11, 2024.
302 IEc analysis. We assume qualified expenditures that would generate sales taxes include material and equipment cost categories

specified in the solar photovoltaic JEDI model. Costs for each category are estimated by first taking the product of the project’s rated
capacity (4 MW) and the solar photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) in the State
of Washington, then by distributing the estimate by the default proportions of total costs for each cost category.
303 The sales tax exemption was modified in 2019 to allow for a refund of 50%, 75%, or 100% of the state and local sales tax paid on

machinery, equipment, and labor and services related to the installation of certain renewable energy systems purchased or installed
after January 1, 2020. Depending on the source of their involved workforce, project owners may qualify for one of the three available
tiers of this exemption. Due to data limitations, we are unable to allocate total sales tax collections to individual refund tiers and
assume 75% of local sales tax paid on qualified expenditures are refunded to project owners.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               170
Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have
gathered about the extent of impacts that project construction and operations have had on employment in
Benton County.

Direct Investments
For the solar photovoltaic component of the system, we estimate costs using the Jobs and Economic
Development Impact (JEDI) input-output model built by NREL for on-shore wind energy development. For this
estimate, we use the model assumption that solar photovoltaic project installation and capital expenditure
costs are $1,030 per kW in the State of Washington (2023 USD). Similarly, we assume that project operation
and maintenance (O&M) costs are $20 per kW (2023 USD).

For the battery energy storage system (BESS) component of the system, we estimate costs using BESS capital
cost estimates from PNNL (2022).304 We then use the input-output model IMPLAN to evaluate the impacts of
this component on the Washington State economy.305

Using these assumptions, we estimate total HRSST construction and installation costs to be approximately
$10.5 million (2023 USD). Annual O&M costs for the solar photovoltaic component of the system is estimated
to be $80,000 (2023 USD).306

Employment
Table B27 presents occupations of residents within the project lease area census tract, Benton County, and
the State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are low in the relevant census tract (4.8 percent) relative to the
Washington State average (9.4 percent), though employment in the natural resources and construction sector
across Benton County overall is higher (12.2 percent) than the Washington State average.

Table B27. Occupation of residents on and nearby the Horn Rapids Solar, Storage, &
Training Project, 2018 - 2022.
                                         Employment in Census tracts        Employment in Benton       Employment in State
Occupation                               intersected by project* (% of      County                     of Washington
                                         total)                             (% of total)               (% of total)

Management/Business/Science/Arts         1,648 (55.3%)                      39,271 (41.6%)             1,664,322 (44.4%)

Sales/Office                             579 (19.4)                         16,937 (17.9%)             697,384 (18.6%)

Service                                  340 (11.4%)                        15,241 (16.1%)             595,994 (15.9%)



304 Pacific Northwest National Laboratory. 2022. “Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic

Assessment. Prepared for U.S. Department of Energy. Available at:
https://www.pnnl.gov/main/publications/external/technical_reports/PNNL-ACT-10125.pdf.
305 For this estimate, we classify our input expenditures as a Commodity Input to the “Storage Batteries” category (IMPLAN Industry

3333) within the State of Washington. This IMPLAN Industry assumes 48.3 percent of expenditures are spent in the State of
Washington per IMPLAN’s Social Accounting Matrix (SAM).
306 We were unable to identify expenditures associated with the O&M costs of the BESS component. PNNL (2022) estimates the total

capital cost of the combined solar photovoltaic and BESS system to be approximately $12.5 million (2023 USD). PNNL (2022) also
projected the annual operation and maintenance of the combined system to cost approximately $100,000 (2023 USD), which would
escalate with each successive year.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                           171
                                               Employment in Census tracts             Employment in Benton           Employment in State
 Occupation                                    intersected by project* (% of           County                         of Washington
                                               total)                                  (% of total)                   (% of total)

 Production/Transportation/Material
                                               270 (9.1%)                              11,422 (12.1%)                 443,300 (11.8%)
 Moving

 Natural Resources/
                                               142 (4.8%)                              11,553 (12.2%)                 351,076 (9.4%)
 Construction/Maintenance

 Total                                         2,979 (100%)                            94,424 (100%)                  3,752,076 (100%)

* The project intersects Census Tract 120; this census tract has a population of zero, so this analysis focuses on Census Tract 102.01, which is
immediately adjacent to the project site.
Source: 2022 ACS 5-Year Survey.

Both JEDI and IMPLAN estimate the direct, as well as the indirect (supplier) and induced (consumer spending)
effects associated with project expenditures. Table B28 presents the estimate for the Horn Rapids Solar,
Storage, and Training project for the construction phase. As shown, we estimate that project construction may
have resulted in 40 full-time equivalent (FTE) jobs and contributed $7 million (2023 USD) to the State of
Washington. As shown in Table B29, we also estimate annual O&M of the solar photovoltaic component of the
system to be associated with one FTE and $110,000 (2023 USD) in contributions to the State of Washington.

Energy Northwest (2020) stated that the project would “bring $3 million into the Tri-Cities economy each
year.”307 However, we were unable to procure any specifics as to how this estimate was calculated and what
impact categories comprised the $3 million estimate.

Table B28. Regional economic impacts of the Horn Rapids Solar, Storage, & Training
Project in Washington, Construction Phase

 Economic              Estimated Project Costs                   Jobs (Full-time
                                                                                          Earnings (2023 USD)             Output (2023 USD)
 Impact                (2023 USD)                                equivalents)

 Total                 $11 million                               40                       $3 million                      $7 million

Source: IEC analysis. Project costs for the solar photovoltaic component of the system are estimated by taking the product of the project’s rated
capacity (4 MW) and the solar photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) for the State of Washington.
Impacts include direct, indirect, and induced effects of construction spending, which are assumed to include spending on labor, materials, equipment,
permitting, and taxes. Materials and equipment costs are assumed not to be spent locally. Job impacts associated with the battery energy storage
system (BESS) component are estimated by inputting BESS capital cost estimates from PNNL (2022) into the input-output model IMPLAN, assuming
48.34% of expenditures are spent in the State of Washington per IMPLAN’s Social Accounting Matrix (SAM).

Note - Estimated project costs include both in-state and out-of-state expenditures. Both JEDI and IMPLAN are run at the state-level, meaning any local
expenditures and job estimates are associated with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality). FTEs have a
duration of one year.




307 Tri-Cities Research District. 2020. “Horn Rapids Solar, Storage and Training Project.” Available at

https://www.tricitiesresearchdistrict.org/horn-rapids-solar-storage-and-training-project/.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                              172
Table B29. Regional economic impacts of the Horn Rapids Solar, Storage, & Training
Project in Washington, O&M phase, Annual
                          Operation and
                                                 Jobs (Full-time
 Economic Impact          Maintenance                                          Earnings (2023 USD)                 Output (2023 USD)
                                                 equivalents)
                          Costs (2023 USD)

 Total                    $80,000                1                             $62,000                             $110,000

Source: IEC analysis. O&M costs are estimated by taking the product of the project’s rated capacity (4 MW) and the solar photovoltaic JEDI model’s
default average cost value of $20 per kW for the State of Washington. Impacts include direct, indirect, and induced effects of O&M spending, which are
assumed to include spending on labor, materials, equipment, and other services. O&M expenditures are assumed to be spent in the State of Washington.
The JEDI model is run at the state-level, meaning any local expenditures and job estimates are associated with in-state impacts and not impacts at finer
spatial scales (e.g., county, municipality). FTEs have a duration of one year.

Note: Due to data limitations, estimates reflect annual job impacts associated with operation and maintenance of the solar photovoltaic component of
the system, but do not include impacts associated with the O&M of the battery storage facility.


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the project has provided to communities.

Unlike many other utility-scale renewable energy projects in Washington, project energy goes to local
communities. The developers established an agreement with the nearby City of Richland that guarantees all
energy generated by the project will go directly to the city. The energy is expected to assist with load leveling
during peak use periods.308

PNNL estimates the total value benefits from electricity bill reduction provided by the project to the residents
of Richland to be $7,386,098. Additionally, the Washington Department of Commerce awarded the City of
Richland with a $3,000,000 Clean Energy Fund (CEF) grant, which directly reduces the cost burden on the
City.309




308 “New Energy Project Powers Up in Richland”, Energy Northwest. November 9, 2020. Accessed on April 29, 2024 at

https://www.energy-northwest.com/whoweare/news-and-info/Pages/New-energy-project-powers-up-in-Richland.aspx.
309 “Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic Assessment”, Pacific Northwest National Laboratory,

August 2022. Prepared for the U.S. Department of Energy.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                             173
Case Study: Tucannon River Wind Project




Type of                      Current       Nameplate
             Location                                     Years of Operation      Size            Facilities
Project                      Owner         Capacity

Wind         Columbia        Portland                                             22,780 leased   116 turbines,
energy       County,         General       267 MW         2014–present            acres on 111    2 meteorological stations,
facility     Washington      Electric                                             land parcels    support facilities


Project Summary
Tucannon River Wind Project is a 267-megawatt (MW) capacity wind energy facility in Columbia County,
Washington. The project began construction in September 2013 and became commercially operational in
December of 2014. The project consists of 116 2.3-megawatt turbines along with various power
collection/distribution infrastructure and several administrative offices. The turbines and blades were
manufactured by Siemens Gamesa Renewable Energy and assembled in Kansas and Iowa, respectively. The
project was developed by Puget Sound Energy; rights were acquired by the current owner, Portland General
Electric (PGE), before construction began. Construction was led by Renewable Energy Systems Americas
Construction with additional engineering and technical consulting support from Burns & McDonnell and
construction inspection by Washington-based MacKay Sposito.310 The project is intended to supplement PGE’s


310 “Tucannon River Wind Farm, Washington”, Power Technology. Accessed on April 17, 2024 at https://www.power-

technology.com/projects/tucannon-river-wind-farm-washington/?cf-view&cf-closed.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                         174
renewable energy portfolio in Oregon.311 PGE serves approximately 900,000 customers, which largely live in
Portland and other urban areas.312

The project lease area is approximately 23,000 acres, across 111 land parcels, nearly three-quarters of which
are farmed (see below evaluation of impacts to impacts to agricultural crop areas). Most of the project area
continues to be used as farmland. As shown in Figure B21 below, the turbines occupy portions of 50 land
parcels that encompass 16,073 acres, or 68.8 percent of the total project area.




311 “PGE Announces Completion of Tucannon River Wind Farm”, Portland General. Accessed on April 17, 2024 at

https://investors.portlandgeneral.com/news-releases/news-release-details/pge-announces-completion-tucannon-river-wind-farm.
312 “PGE Service Area”, Portland General Electric. Accessed on April 17, 2024 at https://portlandgeneral.com/about/info/service-area.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                             175
Figure B21. Tucannon River Wind Project in Columbia County, WA (Washington State
Geospatial Portal,313 U.S. Wind Turbine Database,314 Tucannon River Wind Farm
Access Map315)




Geographic Location/Community Context
Tucannon River Wind Project occupies land in Columbia County, which lies in the southeast portion of
Washington state. Columbia County is a rural county, with a population of 4,026 as of 2022.316 The project is
located near Dayton, which is the county seat and is the county’s most populous city at a population of 2,512




313 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at shttps://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.
314 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E., 2018, United States Wind Turbine Database (ver.

6.1, November 2023): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data
release, https://doi.org/10.5066/F7TX3DN0. Accessed on February 12, 2024.
315 Tucannon River Wind Farm Recreational Access Map. March 2017.
316 2022 ACS Survey, U.S. Census Bureau.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    176
as of 2022.317 The county government employs 77 full time and 14 part time individuals and has an annual
budget of $4.8 million as of 2022.318

Table B30 summarizes community population statistics for the project area. As shown, the population in
Columbia County has a lower median income, higher population without a high school diploma, higher
population over 65 years old, and a somewhat higher energy burden relative to the state population overall.

There are three other similarly sized wind projects nearby: Hopkins Ridge Wind Farm in Columbia County,
which began operations in 2005 and has a generating capacity of 157 megawatts;319 Marengo Wind Farm in
Columbia County, which began operations in 2007 and has a generating capacity of 211 megawatts;320 and
Lower Snake River Wind Project, spanning both Columbia and Garfield County, which began operations in 2012
and has a generating capacity of 343 megawatts.321

Table B30. Community population statistics for Tucannon Project Area (2018 - 2022).

                                        Census tracts intersected by
Metric                                                                 Columbia County           State of Washington
                                        projecta

Population (2022)                       3,980                          3,980                     7,688,549

10-Year Population Change (2012 –
                                        - 0.5%                         - 0.5%                    + 14.1%
2022)

Median Household Income                 $68,825                        $68,825                   $90,325

Population identifying as other than
                                        18.3%                          18.3%                     34.5%
white and non-Hispanic

Population with income below federal
                                        9.3%                           9.3%                      9.9%
poverty level

Population with less than high school
                                        10.1%                          10.1%                     7.9%
diploma or equivalent

Population that is unemployed           2.0%                           2.0%                      3.2%

Population without health insurance     14.6%                          14.6%                     9.2%

Population over 65 years old            28.9%                          28.9%                     16.0%

Population with low English
                                        5.2%                           5.2%                      7.7%
proficiency

Energy burden b                         2.6%                           2.6%                      1.5%




317 2022 ACS Survey, U.S. Census Bureau.
318 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
319 “Hopkins Ridge Wind Facility”, Puget Sound Energy. Accessed on April 25, 2024 at

https://www.pse.com/en/pages/facilities/hopkins-ridge.
320 “Marengo, US”, Power Technology. December 2, 2021. Accessed on April 25, 2024 at https://www.power-

technology.com/marketdata/marengo-us/.
321 “Lower Snake River Wind Facility”, Puget Sound Energy. Accessed on April 25, 2024 at

https://www.pse.com/en/pages/facilities/lower-snake-river.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                     177
a
 The project intersects Census Tract 9602, which is the only census tract in Columbia County.
b
 Energy burden is defined as the percentage of gross household income spent on energy cost.
Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.322

As shown in Figure B22, approximately 29.3 percent of Columbia County is federally owned, two percent state,
and two percent county or locally owned lands.323 Agriculture is the primary economic activity in this county.
Agricultural areas include land for ranching and crop production, with wheat and peas being the most common
crops. Ski Bluewood, a local ski area, is an important source of tourism and seasonal employment for the
county .324




322 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.
323
    Written communication with Columbia County Treasurer on July 19, 2024. Map source: U.S. Geological Survey (USGS) Gap Analysis
Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version 3.0: U.S. Geological Survey data
release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
324 “Columbia County Profile”, Employment Security Department of Washington State. Accessed on April 17, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/Columbia.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                        178
Figure B22. Land ownership in Columbia County, Washington.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   179
Land Use
Figure B23. Agricultural land use surrounding turbines in Tucannon River Wind
Project area (Google Earth, 2023).




THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the impacts of the Tucannon River
Wind Project on land uses within the project lease area and discuss the likelihood of other potential effects
on nearby land uses.

Like other areas in the county, NASS data from 2016 suggests that most crops grown in the lease area are
winter wheat (53.9 percent), but also include spring wheat, peas, and small areas of other crops. At average
2023 values, the crop value in the lease area (16,665 crop acres) were approximately $5.7 million annually,325
or an average of $443 per acre in revenues.326




325 The total value of this cropland was determined by using satellite imagery to approximate the acreage of each crop in the area; then,

each crop was multiplied by its reported value. These values were summed to find the total approximate value of this cropland. Most of
this value comes from winter wheat ($2.3 million) and peas ($2.0 million).
Our analysis of crop value does not include revenue generated from woody wetlands, grapes, oats, apples, sod/grass seed, triticale, and
other crops, which are grown in a total of 11.3 acres of the project footprint and account for less than one percent of the total crop
acreage, due to the lack of relevant data in the 2023 Washington State-level USDA and NASS data set we rely on.
326
    “2023 Washington State Agriculture Overview”, United States Department of Agriculture (USDA) and National Agricultural Statistics
Service (NASS). Accessed on March 6, 2024 at
https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                               180
Net farm income would be a fraction of these total revenues. USDA 2022 data suggests that net revenues for
Washington farms were approximately 18 percent of gross receipts, which would equate to net farm income of
approximately $79 per acre at current crop prices.327,328

In 2011, land use in both the lease area and the project footprint329 were used primarily for agriculture, with
69.5 percent and 71.7 percent of these areas farmed, respectively.330,331 As shown in Table B31 and
highlighted in Figure B24, following project implementation, data indicates that crop acres have increased
slightly from before the project was constructed, with 16,796 acres of cropland harvested in the project lease
area following construction, and 11,888 acres in the project footprint, an increase of 3.4 and 3.1 percent in
cropland, respectively. Figure B23 shows agricultural land use surrounding a turbine in the Tucannon River
Wind Project area in 2023.

In addition to its agricultural value, some areas of the Tucannon River Wind Farm are also open to public
access for hunting of deer, elk, turkey, upland game and other species,332 birdwatching, and other recreational
activities.333 To ensure public safety and safety of the wind project itself, special rules apply and signed Access
Permission Agreement permits (in addition to a hunting license from the State of Washington) are required.334
While no access of any kind is permitted within 300 ft of the facilities and no hunting is allowed in select areas
of the project lease area, different regions of the wind farm may be accessed with permits of three kinds: a)
public access with permits obtained from a local store, b) restricted access with permits obtained directly from
landowners, and c) private access permits only, where public access is unavailable.335

Table B31. Cropland acres within project area before (2011) and after project (2016)
construction.
                              Pre-project, 2011                     Post-Project, 2016
Area                                                                                                         Change (%)
                              (Acres, percent of total)             (Acres, percent of total)

Lease Area                    -                                     -                                        -

Crops                         16,239 (69.5%)                        16,796 (71.9%)                           +3.4%

Developed                     365 (1.6%)                            391 (1.7%)                               +7.1%

Other                         6,749 (28.9%)                         6,167 (26.4%)                            -8.6%

Total                         23,353 (100%)                         23,353 (100%)                            0%




327 United States Department of Agriculture (USDA) Farm sector financial indicators, Gross farm receipts and net farm income for the

State of Washington, 2022. Accessed at
https://data.ers.usda.gov/reports.aspx?ID=17839#P497d065d34af4dde8a5dd22d58d70ae9_3_185iT0R0x0 May 31, 2024.
328 One reviewer of this case study suggested that a five-to-ten-year average value for farm production in this area would be higher, or

approximately $150 to $200 per acre. Written communication with Columbia County Treasurer’s Office on July 19, 2024.
329 The project footprint is defined as including parcels on which turbines are located.
330 2011 Land Cover, National Land Cover Database (NLCD), Multi-Resolution Land Characteristics (MRLC) Consortium. Accessed on

May 23, 2023 at https://www.mrlc.gov/.
331 2016 Land Cover, National Land Cover Database (NLCD), Multi-Resolution Land Characteristics (MRLC) Consortium. Accessed on

May 23, 2023 at https://www.mrlc.gov/.
332 “Hunting at Tucannon”, Portland General Electric. Accessed on April 24, 2024 at https://portlandgeneral.com/hunting-at-tucannon.
333 “Register to Visit Tucannon”, Portland General Electric. Accessed on April 24, 2024 at https://portlandgeneral.com/hunting-at-

tucannon/register-to-visit-tucannon.
334
    “Access rules: Tucannon River Wind Farm, Hopkins Ridge Wind Facility & Marengo Wind Facility”, Portland General Electric.
Accessed on April 24, 2024.
335 “Tucannon River Wind Farm Recreational Access Map”, Portland General Electric. Accessed on April 24, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                181
                             Pre-project, 2011           Post-Project, 2016
Area                                                                                 Change (%)
                             (Acres, percent of total)   (Acres, percent of total)

Project Footprint            -                           -                           -

Crops                        11,529 (71.7%)              11,888 (74.0%)              +3.1%

Developed                    226 (1.4%)                  251 (1.6%)                  +11.3%

Other                        4,321 (26.9%)               3,936 (24.5%)               -8.9%

Total                        16,076 (100%)               16,076 (100%)               0%

Source: 2016 Cropland Data


Figure B24. Change in Tucannon River Project Area Land Use (2011 to 2016).




Source: 2016 Cropland Data


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                182
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates what we can
determine about the effects of Tucannon River Wind Project on landowners in Columbia County.


As is common practice with wind energy project development in rural areas, land parcels in the Tucannon River
Wind Project area are leased by the project owner and most retain their original land ownership status. This is
done through an assignment of easement from the landowner to Portland General Electric Company, thereby
allowing PGE to use the private land for the project. Distinct from a lease, some easements allow use of land in
perpetuity and may be paid in a lump sum or regular payments (e.g., annual payments).336 We were unable to
determine specific agreements PGE may have with landowners for Tucannon.

As discussed above, parcels in this area continue to be farmed following project implementation. Property
owners within the leased areas typically enter into lease agreements with the project owners for a pre-
development period (typically ranging from two to five years in duration). After the design of the project is
established, landowners for which physical infrastructure is developed are further compensated on a per acre
basis at an established fee. While these agreements are generally confidential to the parties engaged, some
agreements made with public entities are made public that provide insights into these payments.

Agreements can be on a per MW basis or as a percentage of revenues. We were unable to find a power
purchase agreement for Tucannon (likely because it is owned and operated by a utility) and do not estimate
revenues. Estimating returns to property owners for the lease easement payments by MW capacity, a
landowner could receive approximately $7,000 to $9,000 per turbine ($3,000 to $4,000 per MW).337 Across the
entire project (116 turbines or 267 MW) this would equate to $800,000 up to $1.05 million in lease easement
payments per year.

Compared to the conservative estimate of $79 average per acre crop net income within the lease area,
easement payments per turbine in this estimated range would be notably higher annual payments for
landowners, even after accounting for the lost agricultural production. For example, taking a conservative
approach, if the turbines remove 385 productive acres from “Other” without including any potential crop
increases (see Table B31), this results in an annual loss of approximately $30,000. However, the net gain
would remain $770,000 up to $1 million per year for landowners. Lease terms would have to be less than $110
per installed turbine (or approximately $50 per MW) for landowners not to break even based on these
valuations.

We also evaluated assessed values of the parcels within the project lease area prior to and following
Tucannon River Wind Project construction. As shown in Figure B25, parcels in the project footprint had higher
and more variable assessed values on average than parcels within the lease area but outside of the project
footprint. Values remained generally stable across both categories until 2011, when parcels in the project


336 Wind Energy Easement and Lease Agreements. Windustry. September 2005. Windustry’s Wind Easement Work Group.
337 While it is difficult to directly compare leases given the variety of factors likely considered in individual agreements, several publicly
available estimates provided similar annual values. Wind Exchange from the DOE estimated $7,800 in the west
(https://windexchange.energy.gov/economic-development-guide), Windustry estimates $4,000 to $8,000 per turbine or $3,000 to
$4,000 per MW (https://www.windustry.org/how_much_do_farmers_get_paid_to_host_wind_turbines) and a recent presentation at a
USDA forum presented $10,000 as an example (https://www.usda.gov/sites/default/files/documents/2023aof-Sherrick.pdf). For this
analysis, we use the range of $3,000 to $4,000 per MW.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    183
footprint began to increase in value. Footprint parcels peaked in value at $135,233 in 2013 and have been
slowly declining back to pre-project levels since. Parcels outside of the project footprint did not significantly
change year to year.338

Figure B25. Property values of Tucannon River Wind Project leased areas over time.




Source: Columbia County Property Search, 2000-2024. Standard deviation of average per parcel values for all properties in footprint and lease area.
Accessed on April 12, 2024 at http://64.184.153.98/PropertyAccess/PropertySearch.aspx?cid=0.


Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Tucannon Wind Project is owned by Portland General Electric, a regional utility which operates across
state/county lines. Consequently, taxes for the project are centrally assessed as personal property by the state
Department of Revenue. The State assessed the initial personal property value for the 116 turbines at $225
million (2023 dollars) in 2015.339

Personal property tax payments initiated post-construction at over $2.2 million per year from 2016 to 2022.
Because the infrastructure is anticipated to depreciate over time, the personal property tax payments made to
the county will also decline over time. Although improvements to the project may alter the schedule,



338 Columbia County Assessor & Treasurer. Accessed on April 12, 2024 at

http://64.184.153.98/PropertyAccess/PropertySearch.aspx?cid=0.
339 State-assessed utility valuations. Washington State Department of Revenue. Accessible at: https://dor.wa.gov/about/statistics-

reports/state-assessed-utility-valuations.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                184
depreciation is anticipated to reduce the taxable value of the project at a rate that is approximately consistent
with the published state schedule of four percent for utility-scale renewable energy development.340 Based on
this schedule, the project would depreciate to 50 percent of its original value by year 12 and to 15 percent by
year 22 and beyond. By years 22 and beyond, this would result in approximate personal property tax payments
of one sixth of their initial tax payments (e.g., approximately $350,000 to $430,000 per year) using the current
tax levies and valuation guidelines.

Tucannon represents a significant portion of tax revenues for Columbia County. On average, between 2016
and 2024, personal and real property taxes from the project represented 19.4 percent of total property taxes.
However, with depreciation this percent has gone down from averaging 20.6 percent between 2016 and 2019
to 18.2 percent between 2020 and 2023. Over this period, the real property taxes have remained relatively
stable, though they are a small portion of the tax levied from the Tucannon project site. As noted above, these
real property taxes are likely to be paid or reimbursed by the project owner as part of the lease agreements. As
shown in Table B32, real property tax payments from 2019 through the present were relatively minor compared
to personal property tax payments.

The development of projects can also contribute to sales taxes for the materials purchased. In 2014, the year
Tucannon was development there was a notable jump in sales taxes from $500,000 to $4.6 million in Columbia
County. However, due to state sales tax rebates, Columbia County had to reimburse a large portion of sales
taxes (the state has a 75 percent exemption for renewable energy). This resulted in net sales tax revenue of
$1.6 million for 2014, with approximately $3 million returned to the state due to the existing renewable energy
exemption.341

With these data, we can observe changes in total property and sales tax revenues from the year before and
after project construction was completed in 2015. From 2014 to 2016, we find total Columbia County taxes
increased by approximately one percent and increased further by four percent and twelve percent in 2017 and
2018, respectively.

Table B32. Tucannon wind project property tax payments, 2014 – 2023.
                                                                             Total Project Taxes    Total County          % of
 Tax      Real          Personal         Total Project     Total County
                                                                             Collected (2023        Property Taxes        County
 Year     Property      Property         Collections       Property Taxes
                                                                             dollars)               (2023 dollars)        Tax Roll

 2014     $61,796       --               $61,796           $7,207,091        $79,537                $9,276,219            <1%

 2015     $107,256      --               $107,256          $7,851,435        $137,885               $10,093,571           1.4%

 2016     $67,268       $1,813,858       $1,881,127        $9,322,995        $2,388,193             $9,322,995            25.6%

 2017     $64,657       $1,884,057       $1,948,714        $9,709,871        $2,422,394             $9,709,871            24.9%

 2018     $63,884       $2,381,144       $2,445,028        $10,897,809       $2,966,882             $10,897,809           27.2%

 2019     $65,598       $2,479,744       $2,146,202        $11,003,731       $2,557,927             $11,003,731           23.2%

 2020     $48,639       $2,670,276       $2,316,747        $11,848,046       $2,727,540             $11,848,046           23.0%

 2021     $91,732       $2,257,181       $2,099,031        $12,184,455       $2,360,332             $12,184,455           19.4%




340
    Personal Property Valuation Guidelines, Washington State department of Revenue. Accessed on April 25, 2024 at
https://dor.wa.gov/taxes-rates/property-tax/personal-property-valuation-guidelines.
341 History of Sales Tax Distribution in Columbia County, 2024. Obtained from Columbia County Treasurer’s Office on March 15, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            185
                                                                                    Total Project Taxes   Total County      % of
 Tax       Real             Personal           Total Project      Total County
                                                                                    Collected (2023       Property Taxes    County
 Year      Property         Property           Collections        Property Taxes
                                                                                    dollars)              (2023 dollars)    Tax Roll

 2022      $67,619          $2,246,574         $2,225,370         $11,736,137       $2,316,976            $11,736,137       19.7%

 2023      $91,525          $1,866,475         $1,958,000         $11,438,795       $1,958,000            $11,438,795       17.1%

 Total     $729,974         $17,599,309        $18,329,283        $103,200,365      $19,915,666           $107,511,629      18.5%

Over 100 unique property parcels were assigned to Tucannon for real property tax.
Sources: IEc GIS analysis and Columbia County Treasurer’s Office, 2024.


Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have
gathered about the extent of impacts that project construction and operations have had on employment in
Columbia County.

Direct Investments
We estimate total Tucannon River Wind Project costs using the Jobs and Economic Development Impact
(JEDI) input-output model built by NREL for on-shore wind energy development. For this estimate, we use the
model assumption that wind energy project installation and capital expenditure costs are $1,531 per kW in the
State of Washington (2023 USD). Similarly, we assume that project operation and maintenance (O&M) costs
are $38 per kW (2023 USD). Using these assumptions, we estimate total Tucannon River Wind Project
construction and installation costs to be approximately $409 million (2023 USD). O&M costs are estimated to
be $11 million (2023 USD).342

PGE has mentioned their team purchased “a significant portion” of the construction materials from local
sources, reducing transportation costs. However, the definition of local is unclear, as well as the exact nature
of the construction materials in question.343

Employment
Table B33 presents occupations of residents within the project lease area census tract, Columbia County, and
the State of Washington, as broadly grouped by the American Community Survey. As shown, occupations that
include natural resources and construction are high in the relevant census tract in Columbia County (13.4
percent) when compared with the Washington State average (9.4 percent).




342 PGE’s 2015 Annual Report forecasted the capital expenditures of the project to be $525 million to set customer prices. “2015 Annual

Report,” Portland General Electric. January 29, 2016. Accessed on April 24, 2024 at https://investors.portlandgeneral.com/static-
files/9fa1b132-62aa-4ad1-a9c1-6a1b7e95b137.
343 “Tucannon River Wind Farm”, Portland General Electric. November 9, 2015. Accessed on April 24, 2024 at

https://www.portlandgeneral.com/our_company/news_issues/news_releases/11_09_2015_Tucannon_River_Wind_Farm.aspx.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                              186
Table B33. Occupation of residents on and nearby the Tucannon Wind Project, 2018 -
2022.
                                                      Employment in Census           Employment in Columbia    Employment in State of
 Occupation                                           tracts intersected by          County                    Washington
                                                      project* (% of total)          (% of total)              (% of total)

 Management/Business/Science/Arts                     657 (35.8%)                    657 (35.8%)               1,664,322 (44.4%)

 Sales/Office                                         325 (17.7%)                    325 (17.7%)               697,384 (18.6%)

 Service                                              305 (16.6%)                    305 (16.6%)               595,994 (15.9%)

 Production/Transportation/Material Moving            300 (16.4%)                    300 (16.4%)               443,300 (11.8%)

 Natural Resources/
                                                      246 (13.4%)                    246 (13.4%)               351,076 (9.4%)
 Construction/Maintenance

 Total                                                1,833 (100%)                   1,833 (100%)              3,752,076 (100%)

*The project intersects Census Tract 9602, which is the only census tract in Columbia County.
Source: 2022 ACS 5-Year Survey.

According to PGE, the project generated approximately 300 jobs during construction and 18 permanent jobs
during the O&M phase.344 The specific source of these job estimates is not clear, as is the extent of these jobs
that were created locally to the project. PGE selected Renewable Energy Systems Americas (RES Americas) as
the general contractor, which advertises experiences in wind and solar contractor services nationwide.345
Current employment listings include what appear to be positions in specific construction sites in various
western states, but do not include Washington State as of March 2024.346

We developed a modeled estimate of job effects of the project using JEDI to evaluate the impacts of the
project on the Washington State economy (Tables B34 and B35). The JEDI model estimates the direct, as well
as the indirect (supplier) and induced (consumer spending) effects associated with project expenditures.
Table B34 presents the estimate for the Tucannon River Wind project for the construction phase. As shown,
we estimate that project construction may have resulted in 744 full-time equivalent (FTE) jobs and contributed
$133 million (2023 USD) to the State of Washington. As shown in Table B35, we also estimate annual O&M
activities to be associated with 38 FTE jobs and $7 million (2023 USD) in contributions to the State of
Washington. We do not have estimates of how much of this activity occurred in localized areas.

Table B34. Regional economic impacts of the Tucannon River Wind Project in
Washington, Construction Phase
 Economic             Estimated Project Costs                   Jobs (Full-time
                                                                                         Earnings (2023 USD)      Output (2023 USD)
 Impact               (2023 USD)                                equivalents)

 Total                $409 million                              744                      $51 million              $133 million




344 “2015 Annual Report,” Portland General Electric. January 29, 2016. Accessed on April 24, 2024 at

https://investors.portlandgeneral.com/static-files/9fa1b132-62aa-4ad1-a9c1-6a1b7e95b137.
345 “Tucannon River Wind Farm, Washington,” Power Technology. December 30, 2014. Accessed on April 24, 2024 at

https://www.power-technology.com/projects/tucannon-river-wind-farm-washington/?cf-view.
346 “Current opportunities”, Renewable Energy Systems Group. Accessed on April 24, 2024 at https://www.res-

group.com/careers/current-opportunities.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  187
Source: IEc analysis. Project costs are estimated by taking the product of the project’s rated capacity (266.8 MW) and the onshore wind JEDI model’s
default average cost value of $1,531 per kW (including sales tax) in the State of Washington. Impacts include direct, indirect, and induced effects of
construction spending, which are assumed to include spending on labor, materials, equipment, development, and taxes. While some construction costs
are assumed to be spent in the State of Washington, equipment costs and some material costs are assumed not to be spent locally. Estimated project
costs include both in-state and out-of-state expenditures. The JEDI model is run at the state-level, meaning any local expenditures and job estimates are
associated with in-state impacts rather than at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Table B35. Regional economic impacts of the Tucannon River Wind Project in
Washington, O&M Phase, Annual
                           Operation and
                                                   Jobs (Full-time
 Economic Impact           Maintenance                                        Earnings (2023 USD)                  Output (2023 USD)
                                                   equivalents)
                           Costs (2023 USD)

 Total                     $11 million             38                         $3 million                           $7 million

Source: IEc analysis. O&M costs are estimated by taking the product of the project’s rated capacity (266.8 MW) and the onshore wind JEDI model’s
default average cost value of $38 per kW in the State of Washington. Impacts include direct, indirect, and induced effects of O&M spending, which are
assumed to include spending on personnel, insurance, replacement parts and equipment, taxes, and other materials and services. O&M expenditures are
assumed to be spent in the State of Washington. The JEDI model is run at the state-level, meaning any local expenditures and job estimates are
associated with in-state impacts rather than at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the Tucannon River Wind Project has provided to communities.

Mike Talbott, the Former Columbia County Commissioner, considers the Tucannon River Wind Farm to be “a
great addition to Columbia County and the Dayton community.”347 Through a Memorandum of Agreement
between Columbia County, the State of Washington, the Washington Department of Fish and Wildlife, the Blue
Mountain Community Foundation, PGE established the Portland General Electric Tucannon River Wind Farm
Habitat Project Fund in 2015.348 The Fund provides grants for conservation projects in Columbia County
focused on habitat conservation, restoration, monitoring, management, and enhancement benefitting the
wildlife, natural habitats, and residents of the County.349 In 2021, the annual budget was estimated to be up to
$20,000.350 According to communications with the Columbia County Assessor’s and Treasurer’s Office, PGE
invested in the fire district and funded several other small-scale initiatives, but does not currently have a
presence in Columbia County.351




347 “PGE announces Completion of Tucannon River Wind Farm”, Portland General Electric. December 15, 2014. Accessed on April 24,

2024 at https://investors.portlandgeneral.com/static-files/df0d1c4b-1de3-40c4-87b8-4779cd35e7a6.
348 “PGE Tucannon River Wind Farm Habitat Project Fund: Request for Proposal”, Blue Mountain Community Foundation. Accessed on

April 24, 2024.
349 “Grant opportunity for Habitat restoration in Columbia County”, Dayton Chronicle. February 11, 2021. Accessed on April 24, 2024 at

https://www.daytonchronicle.com/story/2021/02/11/news/grant-opportunity-for-habitat-restoration-in-columbia-county/1515.html.
350
    “Request for Proposals: PGE Tucannon River Wind Farm Habitat Project Fund (U.S.)”, FundsforNGOs. Accessed on April 24, 2024 at
https://www2.fundsforngos.org/latest-funds-for-ngos/request-for-proposals-pge-tucannon-river-wind-farm-habitat-project-fund-u-s/.
351 Personal communication with Columbia County Treasurer’s Office on March 15, 2024.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                               188
Planned Clean Energy Projects: Case Study




Photo: Rattlesnake Flat Wind Farm, courtesy of Grow Adams County




                                                                   Planned       Planned
                  Project       Planned                                                     Planned
 Project Name                                   Current Owner      Nameplate     Storage                      Planned Size
                  Type          Location                                                    Construction Year
                                                                   Capacity      Capacity

                  Solar &                                                                                     2,409 acres
                                Klickitat       Cypress Creek
 Carriger Solar   battery                                          160 MW        63 MW      2025              across 25
                                County          Renewables
                  storage                                                                                     parcels

                  Solar,
 Horse Heaven                                                                                                 74,948 acres
                  Wind, &       Benton          Scout Clean        975 – 1,150
 Clean Energy                                                                    300 MW     2025              across 235
                  battery       County          Energy             MW
 Center                                                                                                       parcels
                  storage

                                                Desert Claim
                                                                                                              4,352 acres
 Desert Claim                   Kittitas        Wind Power LLC                              Completed by
                  Wind                                             100 MW        -                            across 36
 Wind                           County          (subsidiary of                              Nov. 2028
                                                                                                              parcels
                                                enXco)


Summary of Projects
As renewable energy expands across the United States, at least 16 additional utility-scale renewable energy
projects are planned or proposed in Washington State as of summer 2024. Below, we review three of these
planned projects: Carriger Solar, Horse Heaven Clean Energy Center, and Desert Claim Wind.

Carriger Solar
Carriger Solar is a proposed 63-megawatt (MW) capacity solar energy and storage facility in Klickitat County,
Washington. The project is currently awaiting approval, with construction expected to commence in 2025.



RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                       189
Cypress Creek Renewables, the project developer and current owner, bypassed the county’s moratorium on
new solar projects by siting through EFSEC.352

The Carriger Solar project area is made up of 25 parcels containing a total of about 2,400 acres. The Maximum
Project Extent (MPE), or the largest possible area that will be disturbed by the project, is a smaller area of
1,323 acres that will contain all solar array areas, the Battery Energy Storage System (BESS) facilities, and
other related transmission equipment. This land is mostly located within the Klickitat County Extensive
Agriculture District with two parcels and an access road located in the Klickitat County General Rural District.
The southern portion of the project area is located within the Klickitat County Energy Overlay Zone.353 Because
economic and environmental impact analyses have already been completed for the entire EOZ area,
developers can automatically bypass county zoning applications and approvals, thus expediting the
installation of renewable energy projects in the region.354 Historically, the project area and surrounding land
has primarily been used for crop production and pasture, though the extent and quality of these lands has been
the subject of recent debate between the project developer and the Washington State Department of
Agriculture.355,356

Horse Heaven Clean Energy Center
Horse Heaven Clean Energy Center is planned to be built in Benton County, Washington and is currently owned
by Scout Clean Energy. The project will incorporate solar, wind, and battery storage facilities to produce up to
1,150 MW of energy. Originally, the project included two solar arrays, 244 wind turbines, and two battery
storage systems.357 Due to the project’s potential impact on historical and cultural resources, EFSEC proposed
to halve the number of turbines, which would bring total project capacity to 975 MW. However, Governor Inslee
asked EFSEC to reconsider this proposal and revisit the feasibility of producing the original 1150 MW of
capacity while adequately protecting high-priority cultural and historic areas before August 21, 2024.358 The
project is currently slated to begin construction in 2025, though this is subject to change.

Horse Heaven is currently planned to occupy about 74,900 acres and overlap 235 land parcels in southeastern
Benton County. The solar siting area is located within this larger project area and takes up approximately
10,700 acres. The project area and nearby land has been used primarily for agricultural purposes, particularly
winter wheat production and pasture, with scattered areas of developed land and scrubland.359




352 “Solar project bypasses Klickitat County approval process”, Columbia Gorge News. Feb 22, 2023. Accessed on June 6, 2024 at

https://www.columbiagorgenews.com/news/solar-project-bypasses-klickitat-county-approval-process/article_585d187c-b241-11ed-
9788-7ffe5fd60239.html.
353 “Carriger Solar”, EFSEC. Accessed on June 6, 2024 at https://www.efsec.wa.gov/energy-facilities/carriger-solar.
354 “Klickitat County’s Energy Overlay Zone Streamlines Future Siting of Energy Projects”, Institute for Local Self-Reliance. July 6, 2005.

Accessed on May 21, 2024 at https://ilsr.org/klickitat-countys-energy-overlay-zone-streamlines-future-siting-energy-projects/.
355 “Carriger Solar”, EFSEC. Accessed on June 6, 2024 at https://www.efsec.wa.gov/energy-facilities/carriger-solar.
356 “Solar project gets warning on soil, pushes back”, The Goldendale Sentinel. Feb 21, 2024. Accessed on June 6, 2024 at

https://www.goldendalesentinel.com/news/solar-project-gets-warning-on-soil-pushes-back/article_2b126834-d0d8-11ee-95fc-
335d3c71aab3.html.
357 “Horse Heaven Wind Project”, EFSEC. Accessed on June 6, 2024 at https://www.efsec.wa.gov/energy-facilities/horse-heaven-wind-

project.
358 “Inslee rejects recommendation to shrink footprint of massive wind farm”, Washington State Standard. May 23, 2024. Accessed

June 6, 2024 at https://washingtonstatestandard.com/2024/05/23/inslee-rejects-recommendation-to-shrink-footprint-of-massive-
wind-farm/.
359 2023 Cropland Data Layer. United States Department of Agriculture (USDA) National Agricultural Statistics Service (NASS).

Accessed June 22, 2023 at https://datagateway.nrcs.usda.gov/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                  190
Desert Claim Wind Farm
Desert Claim Wind Farm is a proposed 100-MW wind facility located in Kittitas County, Washington. The
project owner is Desert Claim Wind Power LLC, a subsidiary of enXco. The project application was originally
submitted in 2006, with a revised version approved in February 2010. The Site Certification Agreement was
revised in October 2023 with an extended deadline for completion of November 2028. Currently, the project
plan consists of at most 31 turbines on 4,400 acres of land.360 The area overlaps 36 land parcels. Most of the
project area is grassland, some of which is used for pasture, and shrubland.361




360 “Desert Claim”, EFSEC. Accessed on June 6, 2024 at https://www.efsec.wa.gov/energy-facilities/desert-claim.
361 2023 Cropland Data Layer. United States Department of Agriculture (USDA) National Agricultural Statistics Service (NASS).

Accessed June 22, 2023 at https://datagateway.nrcs.usda.gov/.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                          191
Figure B26. Washington Planned Energy Projects (Washington State Geospatial
Portal362, U.S. Wind Turbine Database363)




362 Washington State Geospatial Portal, Property Parcel data, Updated February 7, 2024. Accessed at https://geo.wa.gov/datasets/wa-

geoservices::current-parcels/about on February 12, 2024.
363
    Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E., 2018, United States Wind Turbine Database (ver.
6.1, November 2023): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data
release, https://doi.org/10.5066/F7TX3DN0. Accessed on February 12, 2024.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                    192
RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   193
Geographic Location/Community Context
Carriger Solar
Carriger Solar Project is in Klickitat County. Klickitat County is a rural county, located along the border between
Washington and Oregon, with a population of 23,271 in 2022. 364 The project is located about 3.5 miles
west/northwest of Goldendale, the county seat, which has a population of 3,453. The county government
employs 229 full-time and 24 part-time employees and has an annual budget of $59.5 million as of 2023.365,366

Table B36 summarizes community population statistics for the project area. As shown, the population in
Klickitat County has a lower median income, higher population without a high school diploma, higher
population living below the poverty level, higher population over 65, and higher energy burden than the state
population overall.




364 2022 ACS 5-Year Survey, U.S. Census Bureau.
365 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
366 2023 Annual Budget. Klickitat County.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                     194
Carriger will be the newest of several utility-scale clean energy projects in Klickitat County. Existing wind
projects include Lund Hill Solar, Linden Ranch Wind Farm, Big Horn Wind Farm, Hoctor Ridge Wind Farm, Windy
Flats, Windy Point I and II, Harvest Wind, and Juniper Canyon. Juniper Canyon is one of the largest of these
projects at 128 turbines with a combined capacity of 250 megawatts.367 Big Horn Wind Farm, with a capacity
of 249.5 MW and 133 turbines, is also located in the county. Bluebird Solar Project, which has not yet begun
construction, has a planned capacity of 100 megawatts.368

Horse Heaven Clean Energy Center
Horse Heaven Clean Energy Center is in Benton County, a county with a population of 212,791 as of 2022,
making it the 10th most populous county in Washington. Benton County is located at the confluence of the
Yakima, Snake, and Columbia rivers. The project wraps around the southern border of Richland, Washington,
and is nearby other cities such as Benton City, Kennewick, and Badger. Richland has a population of 62,821 as
of 2022 and is the second most populous city in the county, second only to the 84,750-person city of nearby
Kennewick.369 The County government employs 594 full time and 20 part-time individuals and has a biennial
budget of $497.6 million as of the 2023-2024 term.370,371

Table B36 summarizes community population statistics for the project area. As shown, the population in
Benton County has a higher population without health insurance (12.7 percent) and a somewhat higher
population with less than a high school diploma or equivalent (9.9 percent) relative to the state population
overall (9.2 percent and 7.9 percent, respectively).

Horse Heaven Clean Energy Center would be one of the largest clean energy projects in Benton County and the
State of Washington. The two other utility-scale projects in Benton County are Horn Rapids Solar, Storage, &
Training and Columbia Generating Station. The second project, Columbia Generating Station, is a 1,207-MW
nuclear power plant constructed in 1984.372 Multiple other utility-scale clean energy projects, including
Wautoma Solar Energy Project and Hop Hill Solar, have been proposed to be built in Benton County and are at
various stages of permitting and development.373

Desert Claim Wind Farm
Desert Claim Wind occupies land in the rural area of Kittitas County, which has a population of 45,189 as of
2022. 374 The project is located about four miles northeast of Thorp and about eight miles northwest of
Ellensburg. Ellensburg is the county seat and has a population of 18,703 as of 2022.375 The county’s largest



367 “Juniper Canyon Wind Farm”, Renewable Technology. Accessed on May 21, 2024 at https://www.renewable-

technology.com/projects/juniper-canyon-wind-farm/.
368 “EIS Comment Period Ends for Planned Avangrid Solar Project in Klickitat County”, NewsData, February 11, 2022. Accessed on May

21, 2024 at https://www.newsdata.com/clearing_up/briefs/eis-comment-period-ends-for-planned-avangrid-solar-project-in-klickitat-
county/article_5bb4892a-8b68-11ec-b7d1-aba443f902f6.html.
369 2022 ACS 5-Year Survey, U.S. Census Bureau.
370 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
371 “2023-2024 Final Budget”, Benton County. November 29, 2022.
372 “Columbia Generating Station produces record amount of energy in 2022”, Energy Northwest. February 9, 2023. Accessed on April

29, 2024 at https://www.energy-northwest.com/whoweare/news-and-info/Pages/Tri-Cities-nuclear-power-plant-produces-record-
amount-of-energy-for-Northwest.aspx.
373 “Energy Facilities”, Energy Facility Site Evaluation Council. Accessed on April 29, 2024 at https://www.efsec.wa.gov/energy-facilities.
374 2022 ACS 5-Year Survey, U.S. Census Bureau.
375 2022 ACS 5-Year Survey, U.S. Census Bureau.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                195
city, Yakima, is about 25 miles south of the three projects. The County government employs 331 full time and
27 part-time individuals and has an annual budget of $141.3 million as of 2022.376,377

Table B36 summarizes community population statistics for the project area. As shown in Table B36, the
population in Kittitas County has a lower population identifying as other than white and non-Hispanic and lower
population with low English proficiency than the state population overall.

There are two operating utility-scale clean energy projects in Kittitas County. Columbia Solar, which is
composed of three separate solar sites, was constructed in 2022 and has a nameplate capacity of 15 MW.
Wild Horse is a wind farm constructed in 2006 with a total capacity of 274 MW.378 There are also other several
planned projects that have not yet begun construction.

Table B36. Community population statistics for planned Project Areas (2018 - 2022).
                                                         Census tracts
                          Census tracts                                                 Census tracts
                                           Klickitat     intersected by   Benton                          Kittitas   State of
Metric                    intersected by                                                intersected by
                                           County        Horse            County                          County     Washington
                          Carrigera                                                     Desert Claima
                                                         Heavena

Population (2022)         3,406            22,798        2,270            207,560       5,699             44,424     7,688,549

10-Year Population
Change                    n/a              +11.6%        +13.3%           +18.3%        +21.0%            +8.5%      +14.1%
(2012 – 2022)

Median Household
                          $74,470          $66,581       $93,821          $83,778       $102,220          $66,800    $90,325
Income

Population identifying
as other than white and 13.1%              19.8%         47.3%            32.6%         12.8%             19.4%      34.5%
non-Hispanic

Population with
income below federal      20.1%            13.8%         8.4%             10.5%         11.8%             14.5%      9.9%
poverty level

Population with less
than high school          6.9%             10.6%         20.9%            9.9%          5.1%              6.9%       7.9%
diploma or equivalent

Population that is
                          3.9%             3.7%          4.1%             3.0%          1.4%              3.7%       3.2%
unemployed

Population without
                          6.8%             12.2%         18.6%            12.7%         2.6%              7.5%       9.2%
health insurance

Population over 65
                          27.1%            24.4%         11.2%            15.4%         16.0%             16.8%      16.0%
years old

Population with low
                          0.0%             4.9%          19.9%            8.2%          2.4%              1.2%       7.7%
English proficiency




376 2022 Census of Governments, Survey of Public Employment & Payroll Methodology, U.S. Census Bureau. Accessed on March 22,

2024 at https://www.census.gov/data/datasets/2022/econ/apes/2022.html.
377 2022 Annual Budget, Kittitas County.
378 “Wild Horse Wind Power Project”, Energy Facility Site Evaluation Council. Accessed on April 25, 2024 at

https://www.efsec.wa.gov/energy-facilities/wild-horse-wind-power-project.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            196
                                                                Census tracts
                               Census tracts                                                     Census tracts
                                                 Klickitat      intersected by    Benton                           Kittitas      State of
    Metric                     intersected by                                                    intersected by
                                                 County         Horse             County                           County        Washington
                               Carrigera                                                         Desert Claima
                                                                Heavena

    Energy burden b            2.7%              2.6%           1.7%              1.7%           2.0%              2.4%          1.5%

a
 Carriger intersects Census Tract 9501.02 and Desert Claim intersects Census Tract 9753. Horse Heaven intersects six Census Tracts: 108.07, 108.14,
115.01, 115.06, 116, 118.01. The above values for Horse Heaven are a weighted average by project acreage overlap.

b
    Energy burden is defined as the percentage of gross household income spent on energy cost.

Sources: 2022 ACS 5-Year Survey, 2012 ACS 5-Year Survey; U.S Department of Energy LEAD Tool.379

As shown in Figure B27, approximately 70.3 percent of Klickitat County is privately owned; 12.9 percent of the
county is owned by the Yakama Nation, with the remaining lands including federal lands (18.9 percent), state
lands (10.1 percent), and county or locally owned lands (less than one percent).380 The primary commodities
produced in Klickitat County vary across the county: in the west, unmanned aerial vehicles, wood products, and
fruit crops; in center, windsurfing and kite boarding beaches; in the east, vegetable crops and the regional
landfill. Agriculture is present across the county, with fruits, tree nuts, berries, and wine grapes being the most
profitable crops. Agriculture and forestry industries are major employers in the county.381

Approximately 42.9 percent of Benton County is publicly owned, including approximately 74.8 percent federal,
9.7 percent state, and about one percent county or locally owned lands.382 Agriculture is historically and
currently important to the local economy, particularly with the growth of the wine industry. Benton County is
also home to the Hanford Project, which brought many skilled engineers and scientists to the area and
contributed to a strong economic basis in energy production and medical equipment manufacturing.
Recreational and tourism industries are also developing in the county. 383

Approximately 93.0 percent of Kittitas County is publicly owned, including approximately 63.8 percent federal,
28.8 percent state, and less than one percent county or locally owned lands.384 Agriculture is an important
economic activity in this county; in particular, timothy hay is a major cash crop and is grown primarily for
export to Japan and other Pacific Rim countries. Central Washington University, located in Ellensburg, is the
county’s largest employer.385




379 Low-income Energy Affordability Data Tool, Office of State and Community Energy Programs, 2022. Accessed on March 27, 2024 at

https://www.energy.gov/scep/slsc/lead-tool.
380 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
381 “Klickitat County Profile”, Employment Security Department of Washington State, updated July 2022. Accessed on May 21, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/klickitat.
382 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
383 “Benton County Profile”, Employment Security Department of Washington State. March 2022. Accessed on April 29, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/Benton.
384 U.S. Geological Survey (USGS) Gap Analysis Project (GAP), 2022, Protected Areas Database of the United States (PAD-US), Version

3.0: U.S. Geological Survey data release, https://doi.org/10.5066/P9Q9LQ4B. State data accessed on March 14, 2024 at
https://www.sciencebase.gov/catalog/item/622262ded34ee0c6b38b6bd3.
385 “Kittitas County Profile”, Washington State Employment Security Department. July 2022. Accessed on April 25, 2024 at

https://esd.wa.gov/labormarketinfo/county-profiles/kittitas.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                         197
Figure B277. Land ownership in Klickitat, Benton, and Kittitas Counties, Washington.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT            198
RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT   199
Land Use
THE ISSUES // Some community members and other representative interests have expressed concerns that
renewable energy projects may adversely affect local communities, both in terms of losses to productive
lands for agriculture, as well as potentially resulting in reductions in the attractiveness of the area to tourism,
recreation, or other development activities. In this section, we evaluate the potential impacts of each of the


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                         200
three planned clean energy projects on land uses within the project lease area and discuss the likelihood of
other potential effects on nearby land uses.

Like other areas in this part of the county, NASS data from 2023 suggests that most of the crops grown in the
lease area are winter & spring wheat, hay, potatoes, and small areas of other crops. As shown in Table B37,
across all three projects, over two thirds of the project area is used for agricultural purposes as of 2023. About
two or three percent of the area is already developed, and the remaining land is occupied by grass or
shrubland.

    •   At Carriger, 74.4 percent of the project area is used for crop production, with alfalfa, winter wheat, and
        barley being the most common crops. At average 2023 crop values, the value of the crops in the
        Carriger project area (1,791 crop acres) is approximately $1.3 million annually, or an average of $703
        per acre in revenues.
    •   Around 81.0 percent of the Horse Heaven project area is used to produce crops such as winter and
        spring wheat. The total value of the 60,717 crop acres in the Horse Heaven project area is about $10.1
        million annually at an average of $165.60 per acre in revenue.
    •   Though less than one percent of the Desert Claim project area is used for crop production, a large part
        of the “other” uses is likely used as pasture. Based on the project’s final EIS and IEc analysis of satellite
        imagery, we estimate this pasture area to be approximately 4,064 acres.386 In 2023, average rent for
        pasture in Washington was $9 per acre, per year.387 To the extent that the entire 4,064 acres are
        currently used as a rangeland, this suggests an annual revenue to landowners of $36,576. Finally, in the
        Desert Claim project area (15 crop acres), crop revenues totaled around $9,000 annually ($610/acre) in
        annual revenue.

Although the projects aren’t yet constructed, based on similar projects, we can estimate the percentage loss of
land for each project. Wind projects typically lose approximately two percent of the total project area to project
operations; the rest is usually able to retain its original use. Solar projects, however, tend to lose more land to
project operations. Whereas wind turbines don’t physically occupy a large percentage of the ground in the
project area, the installation of solar panels tends to prevent the land from being used as it was before.

    •   Given this information, we would expect 100 percent of the land within the Carriger Solar MPE to be lost
        to the project, resulting in an overall project area loss of 62.8 percent.
    •   Similarly, the maximum of 10,700 acres of land in the Horse Heaven project area sited for solar
        development will be completely lost to project operations, plus about two percent of the remaining
        land. In total, this implies that a maximum of 11,984 acres, or 16 percent of the total project area, will
        no longer be able to continue pre-project activity once construction begins.
    •   Desert Claim is expected to lose only two percent of its land to project-only use.

These estimates provide a sense of the general scale of changes in land use after these projects would be
installed, but projects may change significantly a throughout the permitting, design, and approval process.388




386 Desert Claim Wind Power Project: Final Environmental Impact Statement. August 2004.
387 2023 Cash Rent Per Acre, Pasture in Washington State. United States Department of Agriculture (USDA) National Agricultural

Statistics Service (NASS). Updated August 2023. Accessed on May 31, 2024 at https://quickstats.nass.usda.gov/.
388
    2023 Washington State Agriculture Overview, United States Department of Agriculture (USDA) and National Agricultural Statistics
Service (NASS). Accessed on March 6, 2024 at
https://www.nass.usda.gov/Quick_Stats/Ag_Overview/stateOverview.php?state=WASHINGTON.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                            201
Table B37. Cropland acres within project area (2023)
                             Carriger                              Horse Heaven                         Desert Claim
 Area
                             (Acres, percent of total)             (Acres, percent of total)            (Acres, percent of total)

 Crops                       1,791 (74.4%)                         60,717 (81.0%)                       15 (0.3%)

 Developed                   82 (3.4%)                             1,493 (2.0%)                         77 (1.8%)

 Other                       536 (22.3%)                           12,738 (17.0%)                       4,260 (97.9%)

 Total                       2,409 (100%)                          74,948 (100%)                        4,352 (100%)

Source: 2023 Cropland Data


Financial Returns to Property Owners
THE ISSUES // Community members and lawmakers have inquired as to whether and to what extent the
leasing of lands for renewable energy projects is beneficial or harmful to landowners. Primary concerns
include both the short- and long-term community impacts, as well as whether adjacent landowners could be
affected by these projects. Answering this question is made somewhat challenging due to the confidential
nature of the agreements made between landowners and project developers and is further complicated by
the variety of characteristics that affect neighboring property values. This section evaluates the potential
effects of each of the three planned clean energy projects on landowners in within the project County.

As is common practice with clean energy project development in rural areas, land parcels in the project area
are usually leased to the project owner and most retain their original land ownership status. Property owners
within the leased areas typically enter into lease agreements with the project owners for a pre-development
period (typically ranging from two to five years in duration). After the design of the project is established,
landowners for which physical infrastructure is developed are further compensated on a per acre basis at an
established fee. While these agreements are generally confidential to the parties engaged, some agreements
made with public entities are made public that provide insights into these payments. All three planned projects
overlap with at least one parcel of state-owned land; any public lease agreements between the developer and
the state may help estimate lease terms for private landowners.

Table B38 summarizes hypothetical leasing payments for the three planned projects using publicly available
leasing rates.389 These are illustrative and intended to provide an example of potential payments to



389 While it is difficult to directly compare leases given the variety of factors likely considered in individual agreements, several publicly

available estimates provided similar annual values. Wind Exchange from the DOE estimated $7,800 per MW in the west
(https://windexchange.energy.gov/economic-development-guide), Windustry estimates $4,000 to $8,000 per turbine or $3,000 to
$4,000 per MW (https://www.windustry.org/how_much_do_farmers_get_paid_to_host_wind_turbines) and a recent presentation at a
USDA forum presented $10,000 as an example (https://www.usda.gov/sites/default/files/documents/2023aof-Sherrick.pdf). Based on
these rates and the uncertainty of these projects, we use a range of $3,000 to $7,800 for the estimate of returns for landowners in the
Desert Claim and Horse Heaven Wind project areas.
Solar payments tend to be lower dollar amounts but on a per acre basis. BLM rents range from $18.61 per acre up to $62,000 per acre
depending on the zone with a median of $400 per acre in zone 8 (https://www.blm.gov/sites/default/files/policies/IM2021-
005_att5.pdf, https://www.blm.gov/sites/default/files/policies/IM2021-005_att1_0.pdf). Kittitas County is in Zone 4 ($108/acre) and
Benton County is in zone 6 ($216/acre). The Strategic Solar Group lists a broad range of $300 to $2,000 per acre as a standard range,
noting that a variety of factors, including proximity to a substation influence the leasing rate (https://strategicsolargroup.com/what-is-
the-average-solar-farm-lease-rate/). They note that in California’s Central Valley leases are typically around $1,000 per acre. Based on
these rates and the uncertainty of these projects, we use a range of $216 to $1,000 per acre for the estimate of returns for landowners
in the Horse Heaven Solar project area and $108 to $1,000 per acre for landowners in the Carriger Solar area.


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                     202
landowners. This example does not include any payments during pre-development or additional payments
such as bonus payments and access payments (e.g., for roads).

Table B38. Estimated leasing rates and payments to landowners.
                                                         Turbine
                       Wind          Turbines                            Solar Acres            Solar Rent per Solar Annual               Total Annual
    Project                                              Annual
                       MWs           Rent Per MW                         Leased                 Acre           Payments                   Payments
                                                         Payments

                                                                                                $108 to             $260,000 to $2.4 $260,000 to
    Carriger Solar     --            --                  --              2,409
                                                                                                $1,000              million          $2.4 million

                       175 to        $3,000 to           $525,000 to                            $216 to             $2.3 million to       $2.8 million to
    Horse Heaven                                                         10,700
                       350           $7,800              $2.7 million                           $1,000              $11 million           $13 million

                                     $3,000 to           $300,000 to                                                                      $300,000 to
    Desert Claim       100                                               --                     --                  --
                                     $7,800              $780,000                                                                         $780,000

This table is an illustrative example of potential lease payments using publicly available leasing estimates. It is not indicative of actual lease agreements
made for these proposed projects. Leasing rates vary considerably and any change to project plans would affect these estimates.


Taxes
THE ISSUES // Projects bring tax revenues to counties. However, there have been questions raised about
whether the impacts are sustained over time and how the changes to tax payments over time affect the
counties in which they are located, particularly as projects depreciate over time.

Since these projects have not yet been constructed, they have not paid at taxes (real, personal or sales). Table
B39 presents an estimated effect of the projects on taxes. This is a hypothetical example using prevailing tax
rates as of 2023. All three projects, if constructed as currently planned would represent over 1 percent of their
county’s tax base as of 2023.

Table B39. Planned project estimated personal property and sales tax payments.
                                                                                                                                          Personal
                                                              2023       Personal                                   Total County
                                          Assessed Value                                      Sales Taxes                                 Property % of
    Project              County                               County     Property Taxes                             Taxes Collected
                                          (2023 dollars)a                                     (2023 dollars)                              County Tax
                                                              Levy       (2023 dollars)b                            (2023 dollars)
                                                                                                                                          Roll

    Carriger Solar       Klickitat        $205 million        0.656%     $1 million           $11 million           $105 million          1.3%

                                          $1.5 to $1.8                   $13 million to       $99 million to
    Horse Heaven         Benton                               0.874%                                                $252 million          5.2% - 6.2%
                                          billion                        $16 million          $118 million

    Desert Claim         Kittitas         $153 million        0.801%     $1 million           $8 million            $106 million          1.2%

This table is intended to be illustrative and hypothetical. Should levy rates, assessment approaches, or project details change, the amount of taxes
collected would change. In addition, real property taxes are excluded from this table given uncertainty on how those taxes may change once a project is
developed.

a
    We assume assessed values are approximately equivalent to estimated construction costs applied in our job impacts analysis.
b
    Personal Property tax payments were estimated using the 2023 levy rate for each Project County and the estimated assessed values.


Jobs
THE ISSUES // Community members and representative interests have inquired about how much effect
renewable energy projects have on local employment. This section describes information that we have


RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                                  203
gathered about the extent of potential impacts that project construction and operations may have on local
employment.

Direct Investments
For each planned project, we calculate direct investments using an input-output model for each involved
technology. for solar photovoltaic and on-shore wind components of a system, we estimate total project costs
using the Jobs and Economic Development Impact (JEDI) input-output model built by NREL for either solar
photovoltaic or on-shore wind energy development.

For solar photovoltaic system components, we use the model assumption that solar photovoltaic project
installation and capital expenditure costs are $1,030 per kW in the State of Washington (2023 USD). Similarly,
we assume that project operation and maintenance (O&M) costs are $20 per kW (2023 USD).

For onshore wind system components, we use the model assumption that wind energy project installation and
capital expenditure costs are $1,531 per kW in the State of Washington (2023 USD). Similarly, we assume that
project O&M costs are $38 per kW (2023 USD).

For the battery energy storage system (BESS) components, our methodology varies by project. For the Carriger
Solar Project, we estimate costs using BESS cost estimates from Magnum Economics (2022).390 For the Horse
Heaven Clean Energy Center, we estimate costs using an average BESS capital cost of $1,353 per kW (2023
USD) for the Northwest (NWPP) region of the United States of America from U.S. EIA’s Annual Energy Outlook
(AEO).391 We then use the input-output model IMPLAN to evaluate the impacts of this component on the
Washington State economy.392,393

    •   Using these assumptions, we estimate total Carriger Solar Project construction and installation costs
        to be approximately $205 million (2023 USD), and O&M to cost $3.2 million (2023 USD).
    •   Horse Heave Clean Energy Center is estimated to cost between $1.5 and $1.8 billion (2023 USD) for
        construction and installation, and between $23 and $30 million (2023 USD) for O&M.
    •   We estimate total Desert Claim Wind Farm construction and installation costs to be approximately
        $153 million (2023 USD), and O&M to cost $4 million (2023 USD).

Employment
Table B40 presents occupations of residents within each planned project’s lease area census tract, project
County, and the State of Washington, as broadly grouped by the American Community Survey.

    •   For the Carriger Solar Project, occupations that include natural resources and construction are high in
        the relevant census tracts (13 percent) as well as Adams County (29 percent) when compared with the
        Washington State average (9.4 percent). For the Carriger Solar Project, occupations that include natural
        resources and construction are high in the relevant census tracts (13 percent) as well as Klickitat
        County (15.5 percent) when compared with the Washington State average (9.4 percent).


390 Mangum Economics. (2022). Carriger Solar Economic & Fiscal Contribution to Klickitat County and the State of Washington.

Prepared for Cypress Creek Renewables. Available at
https://www.efsec.wa.gov/sites/default/files/230001/001/Attachment_J_Carriger_Socioeconomic_Report.pdf.
391 U.S. Energy Information Administration. 2023. Cost of Performance Characteristics of New Generating Technologies, Annual Energy

Outlook 2023. Available at https://www.eia.gov/outlooks/aeo/assumptions/pdf/elec_cost_perf.pdf.
392 For this estimate, we classify our input expenditures as a Commodity Input to the “Storage Batteries” category (IMPLAN Industry

3333) within the State of Washington. This IMPLAN Industry assumes 48.3 percent of expenditures are spent in the State of
Washington per IMPLAN’s Social Accounting Matrix (SAM).
393 We were unable to identify expenditures associated with the O&M costs of the BESS component.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                         204
       •      For the Horse Heaven Clean Energy Center, occupations that include natural resources and
              construction are high in the relevant census tracts (27.9 percent) as well as Benton County (12.2
              percent) when compared with the Washington State average.
       •      For the Desert Claim Wind Project, occupations that include natural resources and construction are
              high in the relevant census tracts (13.3 percent) as well as Kittitas County (9.7 percent) when
              compared with the Washington State average.

Table B40. Occupation of residents on and nearby Planned Clean Energy Projects,
2018 - 2022.
                                                                        Census                         Census
                                    Census tracts                       tracts                         tracts
                                                     Klickitat                            Benton                       Kittitas      State of
    Metric                          intersected by                      intersected                    intersected
                                                   a County                               County                       County        Washington
                                    Carriger Solar                      by Horse                       by Desert
                                                                        Heaven*                        Claim*

    Management/Business/                                                                  39,271       1,239           8,300         1,664,322
                                    357 (31.2%)        4,211 (44.1%) 347 (33.7%)
    Science/Arts                                                                          (41.6%)      (47.1%)         (37.6%)       (44.4%)

                                                                                          16,937                       4,416         697,384
    Sales/Office                    281 (24.6%)        1,392 (14.6%) 150 (14.5%)                       522 (19.8%)
                                                                                          (17.9%)                      (20.0%)       (18.6%)

                                                                                          15,241                       5,013         595,994
    Service                         297 (26.0%)        1,370 (14.4%) 125 (12.1%)                       271 (10.3%)
                                                                                          (16.1%)                      (22.7%)       (15.9%)

    Production/Transportation/                                                            11,422                       2,214         443,300
                                    60 (5.2%)          1,094 (11.5%) 121 (11.7%)                       252 (9.6%)
    Material Moving                                                                       (12.1%)                      (10.0%)       (11.8%)

    Natural Resources/                                                                    11,553                       2,146         351,076
                                    149 (13.0%)        1,480 (15.5%) 288 (27.9%)                       349 (13.3%)
    Construction/Maintenance                                                              (12.2%)                      (9.7%)        (9.4%)

                                                                                          94,424       2,633           22,089        3,752,076
    Total                           1,144 (100%)       9,547 (100%)     1,031 (100%)
                                                                                          (100%)       (100%)          (100%)        (100%)

a
 Carriger intersects Census Tract 9501.02 and Desert Claim intersects Census Tract 9753. Horse Heaven intersects six Census Tracts: 108.07, 108.14,
115.01, 115.06, 116, 118.01. The above values for Horse Heaven are a weighted average by project acreage overlap.
Source: 2022 ACS 5-Year Survey.

We developed a modeled estimate of job effects of the project using JEDI to evaluate the potential impacts of
the planned clean energy projects on the Washington State economy (Tables B41 and B42). The JEDI model
estimates the direct, as well as the indirect (supplier) and induced (consumer spending) effects associated
with planned project expenditures.

Table B41 presents estimates for the planned clean energy projects for the construction phase. These results
are highly uncertain given the potential for changes in proposals and plans for these three projects. However,
they each support hundreds of jobs during the construction phase as well as millions in contributions to the
regional economy of Washington.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                         205
Table B41. Regional economic impacts of Planned Clean Energy Projects in
Washington, Construction Phase
                                                                 Projected Jobs
                       Estimated Project Costs                                            Projected Earnings              Projected Output
 Project Name                                                    (Full-time
                       (2023 USD)                                                         (2023 USD)                      (2023 USD)
                                                                 equivalents)

 Carriger Solar        $205 million                              890                      $60 million                     $140 million

 Horse Heaven
                                                                                          $410 million to $440
 Clean Energy          $1.5 billion to $1.8 billion              5,600 – 6,000                                            $0.94 to $1.0 billion
                                                                                          million
 Center

 Desert Claim
                       $153 million                              360                      $27 million                     $62 million
 Wind

Source: IEC analysis. For Carriger Solar and Horse Heaven, project costs for the solar photovoltaic component of the system are estimated by taking the
product of the project’s rated capacity and the solar photovoltaic JEDI model’s default average cost value of $1,030 per kW (including sales tax) for the
state of Washington. Job impacts associated with the battery energy storage component are estimated by inputting costs from Magnum Economics
(2022) into the input-output model IMPLAN, assuming 48.34% of expenditures are spent in the state of Washington per IMPLAN’s Social Accounting
Matrix (SAM). For Horse Heaven and Desert Claim, project costs are estimated by taking the product of the project’s rated capacity and the onshore
wind JEDI model’s default average cost value of $1,531 per kW (including sales tax) for the State of Washington.

Note – Impacts include direct, indirect, and induced effects of construction spending, which are assumed to include spending on labor, materials,
equipment, permitting, and taxes. Some materials and equipment costs are assumed not to be spent locally. Estimated project costs include both in-
state and out-of-state expenditures. Both JEDI and IMPLAN are run at the state-level, meaning any local expenditures and job estimates are associated
with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality). FTEs have a duration of one year.


Table B42. Regional economic impacts of Planned Clean Energy Projects in
Washington, O&M Phase, Annual
                          Estimated Operation and
                                                  Projected Jobs (Full-               Projected Earnings
 Project Name             Maintenance Costs (2023                                                                   Projected Output (2023 USD)
                                                  time equivalents)                   (2023 USD)
                          USD)

 Carriger Solar           $3 million                      39                          $3 million                    $4 million

 Horse Heaven Clean                                                                   $15 million to $18
                          $23 million to $30 million      230 - 260                                                 $28 million to $33 million
 Energy Center                                                                        million

 Desert Claim Wind        $4 million                      15                          $1 million                    $3 million

Source: IEC analysis. For Carriger and Horse Heaven, O&M costs for the solar photovoltaic component of the system are estimated by taking the product
of the project’s rated capacity and the solar photovoltaic JEDI model’s default average cost value of $20 per kW for the State of Washington. For Horse
Heaven and Desert Claim, O&M costs are estimated by taking the product of the project’s rated capacity and the onshore wind JEDI model’s default
average cost value of $38 per kW for the State of Washington. Due to data limitations, estimates reflect annual job impacts associated with operation
and maintenance of only the solar and/or wind component of the system, but do not include impacts associated with the O&M of the battery storage
facility. FTEs have a duration of one year.

Note - Impacts include direct, indirect, and induced effects of O&M spending, which are assumed to include spending on labor, materials, equipment, and
other services. O&M expenditures are assumed to be spent in the State of Washington. The JEDI model is run at the state-level, meaning any local
expenditures and job estimates are associated with in-state impacts and not impacts at finer spatial scales (e.g., county, municipality).


Mitigation Impact Payments/Economic Development Assistance
THE ISSUES // Communities and representative interests have inquired whether and to what extent
renewable energy projects provide investments to communities in which they are located. As discussed
above, the projects typically provide payments to landowners in lease areas. In addition, the projects pay




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                                                              206
personal property taxes that are collected by the counties in which they are located. This section discusses
some additional payments that the projects could provide to communities.

Clean energy development in rural areas is sometimes accompanied by local economic development.
Developers may choose to provide additional economic benefits to the local communities impacted by the
incoming project. Across similar utility-scale developments in Washington, developers have donated to local
charities or organizations, established scholarships, agreed to a Project Labor Agreement, or directed a portion
of project revenue to fund local development costs. Though none of the three planned projects have explicitly
stated intentions to provide economic development assistance to nearby communities, it is likely that any
actions taken would be like those seen previously by other nearby developers.




RURAL CLEAN ENERGY ECONOMICS AND COMMUNITY ENGAGEMENT STUDY AND REPORT                                      207


File and source

File
2024_commercereports-rural-clean-energy-final-7c1c334f-7563-4d5b-bb1a-000fa.pdf
Size
7,119,172 bytes
SHA-256
b114e2fe353ad56f086e3a51868c9de70d236b996431257558942cf36d688258
Our copy
2024_commercereports-rural-clean-energy-final-7c1c334f-7563-4d5b-bb1a-000fa.pdf
Original
No public link identified.
Back to top