Pandemic Darlings The pandemic economy, in original documents
Home Source documents Multiple Agency Fiscal Note — 2482 HB, Semiconductor tax incentives (Revenue, JLARC)

Multiple Agency Fiscal Note — 2482 HB, Semiconductor tax incentives (Revenue, JLARC)

Summary

Multiple Agency Fiscal Note Summary for 2482 HB, Semiconductor tax incentives, with estimates for the Department of Revenue and the Joint Legislative Audit and Review Committee. The Department of Revenue narrative says HB 2482 reinstates several expired tax preferences benefiting manufacturers of semiconductor materials and semiconductor microchips, contingent on the siting and commercial operation of a significant semiconductor microchip fabrication facility in Washington, with a new expiration date of January 1, 2034. It says the bill also extends the expiration date of three existing preferences for manufacturers or processors for hire of semiconductor materials. The performance statement refers to at least one project in the semiconductor cluster in Clark County generating at least 2,500 high-wage jobs.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Multiple Agency Fiscal Note — 2482 HB, Semiconductor tax incentives (Revenue, JLARC).” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2024-02-15-a31917-d270000-2482-hb-fn-final-02-02-24-4673026812/, SHA-256 9a451631479489a0021d2f052e874592c1647812a648af2908c40998ad90afd8.

Full text

                                         Multiple Agency Fiscal Note Summary
   Bill Number: 2482 HB                                                 Title: Semiconductor tax incentives

Estimated Cash Receipts
  Agency Name                                     2023-25                                                            2025-27                                               2027-29
                              GF-State            NGF-Outlook              Total                 GF-State        NGF-Outlook          Total          GF-State            NGF-Outlook                 Total
  Department of                           0                     0                     0                      0                  0               0      (626,000)             (626,000)                (626,000)
  Revenue

           Total $                       0                      0                     0                      0                  0               0          (626,000)            (626,000)             (626,000)


  Agency Name                                                    2023-25                                                    2025-27                                    2027-29
                                                         GF- State       Total                                       GF- State      Total                       GF- State      Total
  Local Gov. Courts
  Loc School dist-SPI
  Local Gov. Other                                                                                                                                                                                    (1,980)
  Local Gov. Total                                                                                                                                                                                    (1,980)

Estimated Operating Expenditures
Agency Name                                   2023-25                                                            2025-27                                                            2027-29
                      FTEs       GF-State         NGF-Outlook              Total          FTEs      GF-State         NGF-Outlook     Total          FTEs        GF-State          NGF-Outlook             Total
Joint Legislative       .0                    0                 0             9,600            .0                0              0       9,600         .0                    0                   0               9,600
Audit and Review
Committee
Department of           .1          35,600              35,600               35,600            .1           27,000        27,000       27,000         .1               27,000               27,000            27,000
Revenue

         Total $        0.1         35,600              35,600              45,200          0.1             27,000        27,000       36,600         0.1              27,000               27,000            36,600




Estimated Capital Budget Expenditures
 Agency Name                                         2023-25                                                       2025-27                                          2027-29
                                FTEs               Bonds                     Total               FTEs            Bonds              Total           FTEs           Bonds                     Total
 Joint Legislative Audit             .0                         0                          0         .0                     0                 0            .0                     0                      0
 and Review Committee
 Department of Revenue               .0                         0                          0         .0                     0                 0            .0                     0                      0

                     Total $        0.0                             0                      0         0.0                    0                 0        0.0                         0                      0




 Estimated Capital Budget Breakout
           NONE




        FNPID 70316
             :
  FNS029 Multi Agency rollup
Prepared by:   Amy Hatfield, OFM   Phone:           Date Published:
                                   (360) 280-7584   Final 2/ 2/2024




    FNPID 70316
         :
FNS029 Multi Agency rollup
                            Individual State Agency Fiscal Note

Bill Number:      2482 HB                Title:     Semiconductor tax incentives                              Agency: 014-Joint Legislative Audit
                                                                                                                      and Review Committee

Part I: Estimates
      No Fiscal Impact

Estimated Cash Receipts to:

      NONE


Estimated Operating Expenditures from:
                                                       FY 2024               FY 2025              2023-25              2025-27              2027-29
 Account
 Performance Audits of Government                               2,400                 7,200               9,600                 9,600               9,600
 Account-State        553-1
                                Total $                         2,400                 7,200               9,600                 9,600               9,600


Estimated Capital Budget Impact:

    NONE




   The cash receipts and expenditure estimates on this page represent the most likely fiscal impact. Factors impacting the precision of these estimates,
   and alternate ranges (if appropriate), are explained in Part II.

  Check applicable boxes and follow corresponding instructions:
      If fiscal impact is greater than $50,000 per fiscal year in the current biennium or in subsequent biennia, complete entire fiscal note
      form Parts I-V.
  X   If fiscal impact is less than $50,000 per fiscal year in the current biennium or in subsequent biennia, complete this page only (Part I).

      Capital budget impact, complete Part IV.

      Requires new rule making, complete Part V.


   Legislative Contact:     Kristina King                                                     Phone: 360-786-7190            Date: 01/29/2024
   Agency Preparation:      Pete van Moorsel                                                  Phone: 360-786-5185            Date: 02/01/2024
   Agency Approval:         Eric Thomas                                                       Phone: 360 786-5182            Date: 02/01/2024
  OFM Review:               Gaius Horton                                                      Phone: (360) 819-3112          Date: 02/02/2024

Form FN (Rev 1/00) 193,113.00                                                                                                           Request # 48-1
FNS063 Individual State Agency Fiscal Note                              1                                                                Bill # 2482 HB
Part II: Narrative Explanation
II. A - Brief Description Of What The Measure Does That Has Fiscal Impact
Significant provisions of the bill and any related workload or policy assumptions that have revenue or expenditure impact on the responding agency by
section number.

 HB 2482 reinstates several expired tax preferences benefiting manufacturers of semiconductor materials and
 semiconductor microchips, contingent on the siting and commercial operation of a significant semiconductor microchip
 fabrication facility in Washington. The new expiration date of the preferences is January 1, 2034, unless a contract for the
 construction of a significant semiconductor fabrication facility is signed by that date.

 The bill also extends the expiration date of three existing preferences for manufacturers or processors for hire of
 semiconductor materials. The new expiration date of the preferences is January 1, 2034.

 Tax preference performance statement details:

 Two tax preference performance statements apply to three preferences extended by the bill.

 For the preferential B&O tax rate for manufacturers or processors for hire of semiconductor materials, the Legislature
 categorizes the preference as one intended to induce certain designated behavior by taxpayers, improve industry
 competitiveness, and create or retain jobs, per RCW 82.32.808(2) (a)-(c).

 The Legislature's public policy objective is to maintain and expand business and to maintain and grow jobs in the
 semiconductor cluster.

 The Legislature intends to extend the expiration date of the tax preference if a review finds that:
 a) Since October 19, 2017, at least one project in the semiconductor cluster has located in Clark County, and that this
 project generates at least 2,500 high-wage jobs, all of which pay $20 per hour or more and at least 80% of which pay $35
 per hour or more, and
 b) The number of jobs in the semiconductor cluster in Washington has increased since October 19, 2017.

 For the sales and use tax exemption for gases and chemicals used by a manufacturer or processor for hire of
 semiconductor materials, the Legislature categorizes the preferences as ones intended to induce certain designated behavior
 by taxpayers, improve industry competitiveness, and create or retain jobs, per RCW 82.32.808(2) (a)-(c).

 The Legislature's public policy objective is to encourage significant construction projects; retain, expand, and attract
 semiconductor business; and encourage and expand family-wage jobs.

 The Legislature intends to extend the expiration date of the tax preferences if a review finds:
 a) The number of construction projects in the industry has increased.
 b) The number of people employed by the solar silicon, silicon manufacturing, and semiconductor fabrication industry in
 Washington is the same or more than in 2015, and
 c) That at least 60% of employees earn $60,000 per year.
II. B - Cash receipts Impact
Cash receipts impact of the legislation on the responding agency with the cash receipts provisions identified by section number and when appropriate, the
detail of the revenue sources. Description of the factual basis of the assumptions and the method by which the cash receipts impact is derived. Explanation
of how workload assumptions translate into estimates. Distinguished between one time and ongoing functions.

II. C - Expenditures
Agency expenditures necessary to implement this legislation (or savings resulting from this legislation), with the provisions of the legislation that result in
the expenditures (or savings) identified by section number. Description of the factual basis of the assumptions and the method by which the expenditure
impact is derived. Explanation of how workload assumptions translate into cost estimates. Distinguished between one time and ongoing functions.


Semiconductor tax incentives                                                                       014-Joint Legislative Audit and Review Committee
Form FN (Rev 1/00) 193,113.00                                                                                                        Request # 48-1
FNS063 Individual State Agency Fiscal Note                                2                                                           Bill # 2482 HB
 JLARC staff will work with the Department of Revenue immediately after passage of the bill to ensure project contacts are
 established and all necessary data for JLARC staff’s future evaluation needs are identified and collected.

 Given the January 1, 2034, expiration date, JLARC will review these tax preferences in 2031. The number of preferences
 comprising the review depends on whether the preferences take effect due to the siting and location of a significant
 semiconductor microchip facility in Washington.

 The expenditure detail reflects work conducted to prepare for the future review of the preferences. Costs associated with
 the review are not included in this fiscal note.

 This tax preference review may require additional resources. The audit will be conducted and presented to JLARC
 consistent with the processes used for other tax preference reviews. Based on all tax preference legislation that is passed,
 JLARC may subsequently determine that it can absorb the costs for this proposed bill in its base budget, if the workload of
 other enacted tax preference legislation does not exceed current staffing. JLARC will assess all of the tax preference
 reviews mandated in the 2024 legislative session.

 This audit will require an estimated 1 audit month.

 JLARC Audit Months: JLARC calculates its staff resources in "Audit Months" to estimate the time and effort to undertake
 and complete its studies. An "Audit Month" reflects a JLARC analyst’s time for a month, together with related
 administrative, support, and goods/services costs. JLARC’s anticipated 2023-25 costs are calculated at approximately
 $23,900 per audit month.

Part III: Expenditure Detail
III. A - Operating Budget Expenditures
Account Account Title          Type            FY 2024                 FY 2025              2023-25            2025-27           2027-29
 553-1      Performance Audits State                 2,400                   7,200               9,600               9,600            9,600
            of Government
            Account
                                 Total $                2,400                   7,200             9,600                 9,600             9,600

III. B - Expenditures by Object Or Purpose
                                             FY 2024                FY 2025             2023-25           2025-27           2027-29
  FTE Staff Years
  A-Salaries and Wages                             1,600                  4,700               6,300             6,200             6,200
  B-Employee Benefits                                500                  1,500               2,000             2,000             2,000
  C-Professional Service Contracts
  E-Goods and Other Services                           300                    900             1,200             1,200             1,200
  G-Travel                                                                    100               100               200               200
  J-Capital Outlays
  M-Inter Agency/Fund Transfers
  N-Grants, Benefits & Client Services
  P-Debt Service
  S-Interagency Reimbursements
  T-Intra-Agency Reimbursements
  9-
                                Total $            2,400                  7,200               9,600             9,600             9,600




Semiconductor tax incentives                                                              014-Joint Legislative Audit and Review Committee
Form FN (Rev 1/00) 193,113.00                                                                                               Request # 48-1
FNS063 Individual State Agency Fiscal Note                      3                                                            Bill # 2482 HB
 III. C - Operating FTE Detail: List FTEs by classification and corresponding annual compensation. Totals need to agree with total FTEs in
          Part I and Part IIIA

  Job Classification                                Salary           FY 2024           FY 2025          2023-25        2025-27     2027-29
  Research Analyst                                       131,064
  Support staff                                          110,856
                              Total FTEs                                                                                                     0.0

 III. C - Operating FTE Detail: FTEs listed by classification and corresponding annual compensation. Totals agree with total FTEs in Part I
and Part IIIA.
 NONE



III. D - Expenditures By Program (optional)
 NONE


 Part IV: Capital Budget Impact
 IV. A - Capital Budget Expenditures
      NONE

 IV. B - Expenditures by Object Or Purpose
        NONE

IV. C - Capital Budget Breakout
 Acquisition and construction costs not reflected elsewhere on the fiscal note and description of potential financing methods.
       NONE

 IV. D - Capital FTE Detail: FTEs listed by classification and corresponding annual compensation. Totals agree with total FTEs in Part IVB.


      NONE

Part V: New Rule Making Required
Provisions of the bill that require the agency to adopt new administrative rules or repeal/revise existing rules.




Semiconductor tax incentives                                                                      014-Joint Legislative Audit and Review Committee
Form FN (Rev 1/00) 193,113.00                                                                                                       Request # 48-1
FNS063 Individual State Agency Fiscal Note                               4                                                           Bill # 2482 HB
                                Department of Revenue Fiscal Note

Bill Number:       2482 HB                Title:     Semiconductor tax incentives                           Agency: 140-Department of Revenue


Part I: Estimates
       No Fiscal Impact

Estimated Cash Receipts to:
   Account                                                     FY 2024              FY 2025             2023-25              2025-27            2027-29
   GF-STATE-State                                                                                                                                    (7,000)
    01 - Taxes 01 - Retail Sales Tax
   GF-STATE-State                                                                                                                                  (619,000)
    01 - Taxes 05 - Bus and Occup Tax
                                             Total $                                                                                               (626,000)

Estimated Expenditures from:


                                                        FY 2024                FY 2025              2023-25              2025-27             2027-29
  FTE Staff Years                                                  0.1                   0.1                  0.1                  0.1                 0.1
  Account
  GF-STATE-State           001-1                                20,900                14,700             35,600                27,000              27,000
                                        Total $                 20,900                14,700             35,600                27,000              27,000

 Estimated Capital Budget Impact:
          NONE




    The cash receipts and expenditure estimates on this page represent the most likely fiscal impact. Factors impacting the precision of these estimates,
    and alternate ranges (if appropriate), are explained in Part II.

   Check applicable boxes and follow corresponding instructions:
       If fiscal impact is greater than $50,000 per fiscal year in the current biennium or in subsequent biennia, complete entire fiscal note
  X
       form Parts I-V.
       If fiscal impact is less than $50,000 per fiscal year in the current biennium or in subsequent biennia, complete this page only (Part I).

  X    Capital budget impact, complete Part IV.

       Requires new rule making, complete Part V.


   Legislative Contact:      Kristina King                                                     Phone:
                                                                                                   360-786-7190               Date: 01/29/2024
   Agency Preparation:       Anna Yamada                                                       Phone:
                                                                                                   360-534-1519               Date: 01/30/2024
   Agency Approval:          Marianne McIntosh                                                 Phone:
                                                                                                   360-534-1505               Date: 01/30/2024
   OFM Review:               Amy Hatfield                                                      Phone:
                                                                                                   (360) 280-7584             Date: 01/30/2024

                                                                                                                                    Request # 2482-1-1
 Form FN (Rev 1/00) 192,829.00                                           1                                                               Bill # 2482 HB
FNS062 Department of Revenue Fiscal Note
Part II: Narrative Explanation
II. A - Brief Description Of What The Measure Does That Has Fiscal Impact
 Significant provisions of the bill and any related workload or policy assumptions that have revenue or expenditure impact on the responding agency by
 section number.

 CURRENT LAW
 Semiconductor material manufacturers receive a preferential business and occupation (B&O) tax rate of 0.275% on the
 manufacturing or processing for hire of semiconductor materials.

 Sales and use taxes are exempt to manufacturers and processors for hire on purchases of gases and chemicals used to
 produce semiconductor materials. Manufacturers of silicon solar wafers, silicon solar cells, thin film solar devices, solar
 grade silicon, or compound semiconductor solar wafers also qualify for this exemption.

 Any person claiming the preferential rate or sales and use tax exemption must reimburse the Department of Revenue
 (department) 50% of the amount of the preference or exemption if the number of persons employed by the person claiming
 the tax preference is less than 90% of the employment average for the previous three years.

 “Semiconductor materials” mean silicon crystals, silicon ingots, raw polished semiconductor wafers, and compound
 semiconductor wafers.

 The preferential tax rate and sales and use tax exemption expires on December 1, 2028.

 PROPOSAL
 This bill extends the expiration date for the preferential tax rate and sales and use tax exemption from December 1, 2028, to
 January 1, 2034.

 The bill reinstates the contingency to construct a new semiconductor microchip fabrication with an investment of at least $1
 billion in buildings and equipment. The contingency expired on January 1, 2024. The new expiration date for constructing the
 facility is January 1, 2034.

 With the reinstated contingency, the bill reenacts the incentives connected to the previous contingency. The following
 incentives are contingent on the qualifying facility built by January 1, 2034:
 - B&O tax exemption for semiconductor microchip manufacturing.
 - Preferential B&O tax rate of 0.275% for businesses manufacturing semiconductor materials, including microchips.
 - B&O tax credit based on new jobs created in new buildings that manufacture semiconductive materials.
 - Sales and use tax exemption for constructing new facilities for manufacturing semiconductor materials.
 - Sales and use taxes exemption for purchases of gases and chemicals used in the semiconductor manufacturing process.
 - Property tax exemption on machinery and equipment exempt from sales and use taxes used in manufacturing
 semiconductor materials.

 EFFECTIVE DATE
 This bill contains an emergency clause and takes effect immediately upon the governor’s approval.
II. B - Cash receipts Impact
 Cash receipts impact of the legislation on the responding agency with the cash receipts provisions identified by section number and when appropriate,
 the detail of the revenue sources. Description of the factual basis of the assumptions and the method by which the cash receipts impact is derived.
 Explanation of how workload assumptions translate into estimates. Distinguished between one time and ongoing functions.

 ASSUMPTIONS
 - The department is unaware of plans for a qualifying facility built before July 1, 2029. Because of this, the incentives based
 on the new contingency will not become effective during the fiscal note period.
                                                                                                                                 Request # 2482-1-1
 Form FN (Rev 1/00) 192,829.00                                       2                                                                Bill # 2482 HB
FNS062 Department of Revenue Fiscal Note
  - Annual growth in semiconductor manufacturing activities mirrors the average percent change reflected in the past four
  years of manufacturing activities.
  - Annual growth of the sales and use taxes exemption amount for purchasing gases and chemicals for manufacturing
  activities mirrors the consumer price index (CPI) growth reflected in the S&P Global Market Intelligence November 2023
  forecast.
  - The department receives the taxes from monthly taxpayers the month after the business collects the sales tax from the
  consumer. Most local tax distributions occur the month after the department receives sales and use taxes that businesses
  collect. This leads to a one-month delay in revenues for the state and a two-month delay in revenues for local jurisdictions.
  - This legislation takes effect on March 26, 2024, and extends the expiration date of the current incentives from December
  1, 2028, to January 1, 2034. The extension impacts six months of collections in fiscal year 2029.

  DATA SOURCES
  - Department of Revenue, Annual Tax Performance Report data
  - S&P Global Market Intelligence, November 2023 forecast

  REVENUE ESTIMATES
  This bill decreases state revenues by an estimated $626,000 in the 2027-29 Biennium.

  TOTAL REVENUE IMPACT:

       State Government (cash basis, $000):
          FY 2024 -   $ 0
          FY 2025 -   $ 0
          FY 2026 -   $ 0
          FY 2027 -   $ 0
          FY 2028 -   $ 0
          FY 2029 - ($ 626)

       Local Government (cash basis, $000):
         FY 2024 -   $0
         FY 2025 -   $0
         FY 2026 -   $0
         FY 2027 -   $0
         FY 2028 -   $0
         FY 2029 - ($ 2)
 II. C - Expenditures
 Agency expenditures necessary to implement this legislation (or savings resulting from this legislation), with the provisions of the legislation that result in
the expenditures (or savings) identified by section number. Description of the factual basis of the assumptions and the method by which the expenditure
impact is derived. Explanation of how workload assumptions translate into cost estimates. Distinguished between one time and ongoing functions.

 FIRST YEAR COSTS:
 The department will incur total costs of $20,900 in fiscal year 2024. These costs include:

     Labor Costs – Time and effort equate to 0.07 FTE.
     - Update a Special Notice to inform businesses of the extension.
     - Update information on the department’s website.

     Object Costs - $13,500.
     - Contract computer system programming to extend expiration dates.


                                                                                                                                         Request # 2482-1-1
  Form FN (Rev 1/00) 192,829.00                                           3                                                                   Bill # 2482 HB
FNS062 Department of Revenue Fiscal Note
SECOND YEAR COSTS:
The department will incur total costs of $14,700 in fiscal year 2025. These costs include:

   Labor Costs – Time and effort equate to 0.1 FTE.
   - Develop and maintain annual tax incentive report questions.
   - Review annual tax incentive report submissions and compile statistics and reports.

   Object Costs - $700.
   - Software, training, and travel.

ONGOING COSTS:
Ongoing costs for the 2025-27 biennium equal $27,000 and include similar activities described in the second-year costs. Time
and effort equate to 0.1 FTE.

Part III: Expenditure Detail
 III. A - Expenditures by Object Or Purpose
                                                        FY 2024             FY 2025                  2023-25                 2025-27             2027-29
     FTE Staff Years                                              0.1                      0.1                 0.1                   0.1                 0.1
     A-Salaries and Wages                                       4,800                   8,800               13,600                17,600              17,600
     B-Employee Benefits                                        1,600                   2,900                4,500                 5,800               5,800
     C-Professional Service Contracts                          13,500                                       13,500
     E-Goods and Other Services                                   600                 2,100                  2,700                 2,600               2,600
     G-Travel                                                                           200                    200                   400                 400
     J-Capital Outlays                                            400                   700                  1,100                   600                 600
                                   Total $                    $20,900               $14,700                $35,600               $27,000             $27,000

  III. B - Detail: FTEs listed by classification and corresponding annual compensation. Totals agree with total FTEs in Part I and Part IIIA.


     Job Classification                              Salary             FY 2024            FY 2025           2023-25            2025-27           2027-29
     TAX POLICY SP 2                                        78,120                0.0                                  0.0
     TAX POLICY SP 3                                        88,416                0.0                0.1               0.1                 0.1              0.1
     WMS BAND 2                                             98,456                0.0                                  0.0
                                Total FTEs                                        0.1                0.1               0.1                 0.1              0.1



III. C - Expenditures By Program (optional)
       NONE



Part IV: Capital Budget Impact
 IV. A - Capital Budget Expenditures
    NONE

 IV. B - Expenditures by Object Or Purpose
      NONE

 IV. C - Capital Budget Breakout

   Acquisition and construction costs not reflected elsewhere on the fiscal note and description of potential financing methods.
    NONE

                                                                                                                                            Request # 2482-1-1
 Form FN (Rev 1/00) 192,829.00                                          4                                                                        Bill # 2482 HB
FNS062 Department of Revenue Fiscal Note
  None.

Part V: New Rule Making Required




                                               Request # 2482-1-1
 Form FN (Rev 1/00) 192,829.00             5       Bill # 2482 HB
FNS062 Department of Revenue Fiscal Note
                             LOCAL GOVERNMENT FISCAL NOTE                                                                      Revised
                                                      Department of Commerce

Bill Number:         2482 HB              Title:     Semiconductor tax incentives


Part I: Jurisdiction-Location, type or status of political subdivision defines range of fiscal impacts.
Legislation Impacts:
X Cities:     decrease in sales tax revenue
X Counties:         decrease in sales tax revenue
X Special Districts: decrease in sales tax revenue

    Specific jurisdictions only:
    Variance occurs due to:

Part II: Estimates
    No fiscal impacts.

    Expenditures represent one-time costs:

    Legislation provides local option:

    Key variables cannot be estimated with certainty at this time:

Estimated revenue impacts to:


 Jurisdiction                              FY 2024             FY 2025              2023-25             2025-27                2027-29
 City                                                                                                                                    (584)
 County                                                                                                                                  (745)
 Special District                                                                                                                        (651)
                  TOTAL $                                                                                                              (1,980)
            GRAND TOTAL $                                                                                                              (1,980)

Estimated expenditure impacts to:
   None




Part III: Preparation and Approval
  Fiscal Note Analyst: Tammi Alexander                                              Phone: 360-725-5038           Date:   01/30/2024
  Leg. Committee Contact: Kristina King                                             Phone: 360-786-7190           Date:   01/29/2024
  Agency Approval:        Allan Johnson                                             Phone: 360-725-5033           Date:   01/30/2024
  OFM Review: Amy Hatfield                                                          Phone: (360) 280-7584         Date:   01/30/2024
Page 1 of 3                                                               Bill Number:        2482 HB
FNS060 Local Government Fiscal Note
 Part IV: Analysis
A. SUMMARY OF BILL
Description of the bill with an emphasis on how it impacts local government.
   This bill extends the expiration date for the preferential tax rate and sales and use tax exemption from December 1, 2028,
   to January 1, 2034 on the manufacturing or processing for hire of semiconductor materials.

   It also reinstates the contingency to construct a new semiconductor microchip fabrication with an investment of at least $1
   billion in buildings and equipment. The contingency expired on January 1, 2024. The new expiration date for constructing
   the facility is January 1, 2034.
B. SUMMARY OF EXPENDITURE IMPACTS
Expenditure impacts of the legislation on local governments with the expenditure provisions identified by section number and when
appropriate, the detail of expenditures. Delineated between city, county and special district impacts.


   This bill would not impact local government expenditures because no action is required.
C. SUMMARY OF REVENUE IMPACTS
Revenue impacts of the legislation on local governments, with the revenue provisions identified by section number, and when
appropriate, the detail of revenue sources. Delineated between city, county and special district impacts.


   This bill would decrease sales and use tax revenue for local governments in the future.

   According to the Department of Revenue (DOR) the extension provided by this bill decreases local revenues by an
   estimated $2,000 in the 2027-29 Biennium. DOR is unaware of plans for a qualifying facility built before July 1, 2029.
   Because of this, the incentives based on the new contingency will not become effective during the fiscal note period,
   therefore the impacts are beyond the scope of this fiscal note.

   Counties:
   FY 2024        $0
   FY 2025        $0
   FY 2026        $0
   FY 2027        $0
   FY 2028        $0
   FY 2029       -$745

   Cities:
   FY 2024        $0
   FY 2025        $0
   FY 2026        $0
   FY 2027        $0
   FY 2028        $0
   FY 2029       -$584

   Special Districts:
   FY 2024      $0
   FY 2025      $0
   FY 2026      $0
   FY 2027      $0
   FY 2028      $0
   FY 2029 -$651

   METHODOLOGY:
 Page 2 of 3                                                              Bill Number:   2482 HB
 FNS060 Local Government Fiscal Note
  The distributions in this note for cities, counties, and special districts are based on DOR data for local sales and use tax
  distributions from Calendar Year 2022. Mitigation payments and distributions to hospital benefit zones are not factored into
  this distribution. The result is a distribution of 37.62 percent to counties, 29.52 percent to cities, and 32.86 percent to
  special districts. The one percent DOR administrative fee has also been deducted.

  SOURCES:
  Department of Revenue fiscal note, SB 6137 (2024)
  Department of Revenue Local Tax Distributions (2022)
  Local Government Fiscal Note program, Local Sales Tax model (2024)
  Local Government Fiscal Note Program “Sales and Use Tax Distribution Model” (2024)




Page 3 of 3                                                         Bill Number:   2482 HB
FNS060 Local Government Fiscal Note


File and source

File
2024-02-15_a31917_d270000_2482-hb-fn-final-02-02-24.pdf
Size
431,089 bytes
SHA-256
9a451631479489a0021d2f052e874592c1647812a648af2908c40998ad90afd8
Our copy
2024-02-15_a31917_d270000_2482-hb-fn-final-02-02-24.pdf
Original
No public link identified.
Back to top