Committee/Subcommittee Amendment No. 1 to PCS for CS/HB 741 (2022)
Summary
Committee/Subcommittee Amendment No. 1 to PCS for CS/HB 741 (2022), offered by Representative McClure for the Commerce Committee hearing on the bill, with a title amendment. It removes everything after the enacting clause and inserts a section amending subsection (5) of section 366.91, Florida Statutes, on renewable energy. For customer-owned or leased renewable generation placed in service between January 1, 2024, and December 31, 2025, the customer's energy usage would be offset by 75 percent of the amount credited, with 60 percent for 2026 and 50 percent from January 1, 2027, to December 31, 2028. It provides 20 years under the existing net metering rate design for generation placed in service before January 1, 2029, and sets a July 1, 2022 effective date.
Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used
Cite this document
“Committee/Subcommittee Amendment No. 1 to PCS for CS/HB 741 (2022).”
Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2022-3098-commerce-committee-proposed-committee-bill-amendments-fn-pcs-158a6ccadd/
, SHA-256 9a43b7da709bff09ce5399ee5696efb8a531334827ad8d4af7c7368bea130c9c.Full text
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
COMMITTEE/SUBCOMMITTEE ACTION
ADOPTED (Y/N)
ADOPTED AS AMENDED (Y/N)
ADOPTED W/O OBJECTION (Y/N)
FAILED TO ADOPT (Y/N)
WITHDRAWN (Y/N)
OTHER
1 Committee/Subcommittee hearing bill: Commerce Committee
2 Representative McClure offered the following:
3
4 Amendment (with title amendment)
5 Remove everything after the enacting clause and insert:
6 Section 1. Subsection (5) of section 366.91, Florida
7 Statutes, is amended to read:
8 366.91 Renewable energy.—
9 (5)(a) On or before January 1, 2009, Each public utility
10 shall develop a standardized interconnection agreement and net
11 metering program for customer-owned or leased renewable
12 generation. The commission shall establish requirements relating
13 to the expedited interconnection and net metering of customer -
14 owned or leased renewable generation by public utilities and
15 shall may adopt new rules to administer this section.
16 (b) Effective January 1, 2024, public utility net metering
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 1 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
17 programs for customer-owned or leased renewable generation must
18 provide that:
19 1. Electricity used by the customer in excess of the
20 generation supplied by customer-owned or leased renewable
21 generation is billed by the public utility in accordance with
22 normal billing practices;
23 2. Excess customer-owned or leased renewable generation
24 delivered to the public utility’s electric grid during the
25 customer’s regular billing cycle must be credited to the
26 customer’s energy consumption for the next month’s billing cycle
27 as follows:
28 a. For energy credits produced from customer-owned or
29 leased renewable generation that is placed in service between
30 January 1, 2024, and December 31, 2025, the customer’s energy
31 usage shall be offset by 75 percent of the amount credited;
32 b. For energy credits produced from customer-owned or
33 leased renewable generation that is placed in service between
34 January 1, 2026, and December 31, 2026, the customer’s energy
35 usage shall be offset by 60 percent of the amount credited;
36 c. For energy credits produced from customer-owned or
37 leased renewable generation that is placed in service between
38 January 1, 2027, and December 31, 2028, the customer’s energy
39 usage shall be offset by 50 percent of the amount credited.
40 (c) A public utility customer who owns or leases renewable
41 generation that is placed in service before January 1, 2029,
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 2 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
42 pursuant to a standard interconnection agreement offered by a
43 public utility, shall be granted 20 years to continue to use the
44 net metering rate design and rates that applied at the time the
45 renewable generation was placed into service. This paragraph
46 applies to customers who purchase or lease real property upo n
47 which customer-owned or leased renewable generation is installed
48 for all or part of that 20-year period.
49 (d) On or after the effective date of the net metering
50 programs described in paragraph (b), a public utility may
51 petition the commission for approval to impose any combination
52 of fixed charges, which may include base facilities charges,
53 electric grid access fees, and monthly minimum bills, necessary
54 to ensure that the public utility recovers the fixed costs of
55 serving customers that own or lease renewable generation and
56 that the general body of public utility ratepayers do not
57 subsidize customer-owned or leased generation. Within 180 days
58 after a petition is filed by a public utility pursuant to this
59 paragraph, the commission must issue a final order on the
60 petition.
61 (e) The commission must adopt new rules to become
62 effective January 1, 2029, that establish a new program design
63 for customer-owned or leased renewable generation that is placed
64 in service on or after January 1, 2029. The new program design
65 must comply with the following criteria:
66 1. Public utility customers owning or leasing renewable
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 3 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
67 generation must pay the full cost of electric service and may
68 not be subsidized by the public utility's general body of
69 ratepayers.
70 2. All energy delivered by the public utility must be
71 purchased at the public utility's applicable retail rate and all
72 energy delivered by the customer-owned or leased renewable
73 generation to the public utility must be credited to the
74 customer at the public utility's full avoided costs.
75 (f)1. If at any time the penetration rate of customer-
76 owned or leased renewable generation in a public utility’s
77 service territory is reasonably expected to exceed 6.5 percent
78 within the succeeding 12 months, the commission, upon petition
79 or on its own motion, must initiate rulemaking to adopt a new
80 program design that complies with subparagraphs (e)1.-2. A new
81 program design adopted pursuant to this subparagraph becomes
82 effective 60 days after rule adoption or 60 days after the date
83 the commission determines that the actual penetration rate has
84 reached 6.5 percent, whichever is later, and shall apply to
85 customer-owned or leased renewable generation placed in service
86 after that effective date.
87 2. For purposes of this paragraph, the penetration rate
88 shall be calculated by dividing the total summer peak demand of
89 the public utility by the aggregate gross power rating
90 (alternating current) of all in-service customer-owned or leased
91 renewable generation in the public utility’s service territory.
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 4 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
92 (f) This subsection establishes the minimum requirements
93 for each public utility net metering program. A public utility
94 may petition the commission at any time for approval to offer a
95 net metering program on terms that are not less favorable to
96 customers who own or lease renewable generation than the terms
97 specified in this subsection or in commission rules adopted
98 pursuant to this subsection.
99 (g)1. A public utility may recover, through its fuel and
100 purchased power cost recovery charge, its lost revenues
101 resulting from the incremental addition of residential customer -
102 owned or leased solar photovoltaic generation within the public
103 utility's service territory between July 1, 2022 and December
104 31, 2023, above the level that such generation, for purposes of
105 setting base rates in the public utility's most recent base rate
106 proceeding, was estimated to be installed within the public
107 utility's service territory during the same period.
108 2. A public utility seeking recovery of lost revenues
109 under this paragraph must file with the commission a petition
110 that:
111 a. Identifies the total capacity of residential customer-
112 owned or leased solar photovoltaic generation that, for purposes
113 of setting base rates in the public utility's most recent base
114 rate proceeding, was estimated to be installed in the public
115 utility's service territory between July 1, 2022, and December
116 31, 2023;
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 5 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
117 b. Identifies the total capacity of residential customer-
118 owned or leased solar photovoltaic generation that was installed
119 in the public utility's service territory between July 1, 2022,
120 and December 31, 2023;
121 c. Demonstrates the difference in revenues collected by
122 the public utility as a direct result of the incremental
123 difference in the estimated and actual capacity additions
124 identified in sub-subparagraphs a. and b. and identifies the
125 specific amount that the utility seeks to recover;
126 d. Demonstrates that the relief requested does not cause
127 the public utility to exceed the rate of return on equity
128 authorized by the commission in the public utility's most recent
129 base rate proceeding; and
130 e. Includes such other reasonably related information as
131 the commission may require by rule.
132 3. Upon receipt of a petition that meets the requirements
133 of subparagraph 2., the commission must determine the amount, if
134 any, that the utility is entitled to recover under this
135 paragraph.
136 4. A petition filed under this section may not be filed
137 before December 31, 2023, or after March 31, 2024.
138 5. The Legislature provides the limited, extraordinary
139 relief set forth in this paragraph to address the potential
140 impact on a public utility of a previously unanticipated surge,
141 unaccounted for in the utility's last rate case, in the
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 6 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
142 installation of customer-owned or leased renewable generation
143 over the period specified in this section. The Legislature
144 makes no findings as to whether the recovery of lost revenues by
145 a public utility is appropriate for any other purpose.
146 Section 2. This act shall take effect July 1, 2022.
147
148
149 -----------------------------------------------------
150 T I T L E A M E N D M E N T
151 Remove everything before the enacting clause and insert:
152 An act relating to net metering; amending s. 366.91, F.S.;
153 providing the terms for public utility net metering programs
154 after a specified date; providing a schedule of reductions to
155 net metering rate designs that apply to customers who install
156 purchased or leased renewable generation after specified dates;
157 authorizing certain customers who own or lease renewable
158 generation to remain under the existing net metering rules that
159 currently apply to those customers for a specified time;
160 authorizing public utilities to petition for approval of certain
161 fixed charges designed to meet specified purposes; providing
162 conditions under which rules must be initiated if the
163 penetration rate of customer-owned or leased renewable
164 generation meet a specified threshold; authorizing public
165 utilities to recover specified lost revenues upon meeting
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 7 of 8
COMMITTEE/SUBCOMMITTEE AMENDMENT
Bill No. PCS for CS/HB 741 (2022)
Amendment No. 1
166 certain requirements; providing applicability; providing an
167 effective date.
PCS for CSHB 741 Strike1
Published On: 2/22/2022 10:18:30 PM
Page 8 of 8
File and source
- File
- 2022_3098_commerce-committee_proposed-committee-bill-amendments_fn-pcs-for-cshb-741-strike1.pdf
- Size
- 140,256 bytes
- SHA-256
- 9a43b7da709bff09ce5399ee5696efb8a531334827ad8d4af7c7368bea130c9c
- Our copy
- 2022_3098_commerce-committee_proposed-committee-bill-amendments_fn-pcs-for-cshb-741-strike1.pdf
- Original
- No public link identified.