Full text
|
S B A I N S P E C T O R G E N E R A L A U D I T R E P O R T
COVID-19 AND DISASTER ASSISTANCE
INFORMATION SYSTEMS SECURITY CONTROLS
REPORT NUMBER 22-19 SEPTEMBER 27, 2022
E XEC UTIVE SUMMARY
COVID-19 AND DISASTER ASSISTANCE INFORMATION
SYSTEMS SECURITY CONTROLS
Report 22-
19
What OIG Reviewed
This report presents the results of our audit to
determine whether the U.S. Small Business
Administration (SBA) maintained effective
management control activities and monitoring
of the design and implementation of third-
party operated SBA systems.
Demand for financial assistance because of the
economic effects of the Coronavirus Disease
2019 (COVID-19) pandemic required SBA to
expand the Economic Injury Disaster Loan
(EIDL) and initiate the Paycheck Protection
Program (PPP) loan forgiveness programs.
SBA needed information technology systems
from third-party service providers that could
improve
the
system
efficiency
and
productivity to process high transaction
volumes,
transmit
data
between
other
information systems, and safeguard the
integrity and confidentiality of the personally
identifiable information processed by the
programs.
The design and related monitoring affects data
processed within these third-party systems
and impacts the integrity of the agency’s
system control architecture. These systems
feed data to SBA’s financial systems and
directly
impact
the
effectiveness
of
cybersecurity controls.
Our objective was to determine what internal
controls the organization designed to address
system cybersecurity risks caused by COVID-
19 and disaster economic relief transactions.
We reviewed whether management effectively
designed, implemented, and monitored IT
controls, such as authorization to operate
procedures,
security,
privacy,
incident
response, contract compliance, and system
development for three disaster assistance
systems.
What OIG Found
We found the agency’s entity-level control
environment was not designed in accordance
with federal guidance at the beginning of the
COVID-19 assistance programs. The agency
allowed the third-party systems to be put into
service without conducting the baseline
assessments. With no baseline, the agency
could not perform effective continuous
monitoring. Also, we found that control
processes did not identify, communicate, and
capture privacy and identity risks on an
enterprise-wide basis.
We also found that SBA deployed mission-
critical systems without full adherence to
important SBA security and privacy controls.
For example, we found agency assessment and
oversight of the third-party systems was
incomplete approximately a year after both
systems were put into operation. In addition,
neither system met the requirement for an
independent auditor’s evaluation, such as the
System and Organization Controls (SOC) 1
report. The SOC 1 report provides assurance
that reported financial data is complete and
reliable.
Agency management told us their delay in
effectively designing entity-level controls and
implementing continuous monitoring was
caused by the urgency to deliver immediate
COVID-19 assistance to small businesses.
OIG Recommendations
We made 10 recommendations to strengthen
the
agency’s
entity-level
IT
control
environment. The areas addressed included
cybersecurity risk and privacy controls,
system development life cycle, continuous
monitoring, and the supply chain risk
management processes.
Agency Response
SBA management fully agreed with seven
recommendations,
disagreed
with
two
recommendations,
and
stated
one
recommendation was specific to the pandemic
and will not likely be repeated. While the
agency
agreed
to
implement
seven
recommendations, management’s planned
corrective actions did not fully address
identified control issues. OIG will seek
resolution in accordance with our audit
follow-up procedures.
Office of Inspector General
U. S. Small Business Administration
DATE:
September 27, 2022
TO:
Isabella Casillas Guzman
Administrator
FROM:
Hannibal “Mike” Ware
Inspector General
SUBJECT:
Audit of COVID-19 and Disaster Assistance Information Systems Security
Controls
This report represents the results of our audit COVID-19 and Disaster Assistance
Information Systems Security Controls. We considered management comments on the draft
of this report when preparing the final. SBA management fully agreed with seven
recommendations, disagreed with two recommendations, and stated one recommendation
was specific to the pandemic and will not likely be repeated.
We appreciate the courtesies and cooperation extended to us during this audit. If you have
any questions, please contact me or Andrea Deadwyler, Assistant Inspector General for
Audits, at (202) 205-6586.
cc:
Arthur Plews, Chief of Staff
Therese Meers, Acting General Counsel
Michael Simmons, Attorney Advisor
Stephen Kucharski, Acting Chief Information Officer, Office of the Chief Information
Officer
Luis Campudoni, Deputy Chief Information Officer, Office of the Chief Information
Officer
Francisco Sanchez Jr, Associate Administrator, Office of Disaster Assistance
Patrick Kelley, Associate Administrator, Office of Capital Access
Ron Whalen, Acting Director, Office of Performance and Systems Management
Kate Aaby, Associate Administrator, Office of Performance, Planning, and the Chief
Financial Officer
Tonia Butler, Director, Office of Internal Controls
Peggy Delinois Hamilton, Special Counsel for Enterprise Risk, Office of the
Administrator
Table of Contents
Introduction ....................................................................................................................................................................................................... 1
Background................................................................................................................................................................................................... 1
Disaster Assistance Systems and Security Risk Management .......................................................................................... 2
Results ............................................................................................................................................................................................................ 2
Finding 1: SBA’s Entity-level Control Activities Were Not Effectively Designed ................................................................ 3
Perform Entity-wide Security Risk Management Assessments ............................................................................................ 3
Update the Agency’s System Development Methodology ........................................................................................................ 4
Obtain and Review System and Organization Controls (SOC) Assurance Reports ...................................................... 5
Perform Validations on Third-party System Security Functionalities ............................................................................... 5
Recommendations ..................................................................................................................................................................................... 7
Finding 2: SBA’s Entity-level Monitoring Activities Need Improvement ............................................................................... 8
Complete Authorization to Operate Procedures Before Launching New Systems ....................................................... 8
Table 1. Completion Timeframes for Required Assessment and Authorization Components in Third-
Party Systems Tested.......................................................................................................................................................................... 9
Complete Data Sharing Agreements Prior to Operation .......................................................................................................... 9
Enhance Monitoring Capabilities through Automation .......................................................................................................... 10
Recommendations ................................................................................................................................................................................... 10
Analysis of Agency Response ................................................................................................................................................................... 11
Summary of Actions Necessary to Close the Recommendations ........................................................................................ 11
Appendix I: Objective, Scope, and Methodology .............................................................................................................................. 16
Use of Computer-Processed Data ..................................................................................................................................................... 16
Assessment of Internal Controls ....................................................................................................................................................... 16
Prior Audit Coverage .............................................................................................................................................................................. 17
Appendix II: Management Comments .................................................................................................................................................. 18
1
Introduction
This report presents the results of the audit of the U.S. Small Business Administration’s
(SBA) security controls in information systems used to deliver assistance during the
Coronavirus 2019 (COVID-19) pandemic and disaster assistance programs. The objective
was to determine what internal controls the agency designed to address system
cybersecurity risks caused by COVID-19 and disaster economic relief transactions.
Background
During the past 2 years, SBA modified its systems and program delivery capabilities to
provide emergency COVID-19 pandemic relief and ongoing disaster assistance. The volume
and scope of agency assistance increased potential fraud and cybersecurity threats.
The SBA Office of Disaster Assistance initially used the Disaster Credit Management System
(DCMS) to provide aid under the provisions of the Economic Injury Disaster Loan (EIDL)
program. However, the program generated unprecedented transaction volumes that DCMS
was unable to process. The agency made DCMS a high-value asset system in September
2020. The DCMS high-value asset designation reflects that the system handles Personally
Identifiable Information (PII) and is mission critical. PII refers to information like names,
social security numbers, addresses, etc., that can be used to distinguish or trace an
individual's identity. Systems that meet the definition of Primary Mission Essential
Functions1 or National Essential Functions2 are considered high-value assets.
In March 2020, SBA entered into a contract with a third-party service provider to replace
the Office of Disaster Assistance’s system and used a cloud-based system for COVID-19
EIDL assistance. Similarly, in June 2020 the SBA Office of Capital Access also adopted a
cloud-based system acquired from another third-party service provider to process the
acceptance, review, and disposition of PPP loan forgiveness decisions.
The SBA Office of Disaster Assistance reported three security incidents during the past two
years. The first related to a data breach in March 2020 that affected the PII of
approximately 8,000 applicants because the system did not have the capacity for the
volume of transactions. The second security incident in October 2020 related to a brute
force attack from a foreign source. The most recent incident in January 2022 related to
third parties using stolen identities to access the system.
SBA established an Enterprise Cybersecurity Service to address cybersecurity intelligence,
risk management, and incident response. Enterprise Cybersecurity Service is SBA’s stated
vehicle to meet the initiatives outlined in Presidential Executive Order 14028, Improving
the Nation’s Cybersecurity, and enables SBA to respond to cyber events. The Office of Chief
Information Officer’s Information Security Division provides cybersecurity threat briefings
to the agency’s Enterprise Risk Management Board. As outlined in the Office of
1 Primary Mission Essential Functions are those mission essential functions that must be continuously performed to
support or implement the uninterrupted performance of National Essential Functions.
2 National Essential Functions are select functions that are necessary to lead and sustain the nation during a catastrophic
emergency.
2
Management and Budget (OMB) Circular No. A-123, the Enterprise Risk Management
Board is responsible for the establishment of a governance structure to oversee a robust
risk management and related internal control process. The Federal Information Security
Modernization Act (FISMA) of 2014 requires agencies to report the status of their
information security programs to OMB. The FY 2020-2022 FISMA reporting metrics
measures the agency’s ability to provide a centralized, enterprise-wide view of
cybersecurity risk management activities (i.e., identify, remediate, etc.) across the
organization.
Disaster Assistance Systems and Security Risk Management
The control design and related monitoring affects data processed within third-party and
internal systems. It also affects the integrity of the entire agency system control
architecture. These disaster systems feed data to SBA’s financial systems and directly
impact the effectiveness of cybersecurity controls.
This audit addressed SBA’s need to securely process high volumes of loan transactions and
concurrently deliver prompt financial assistance to small businesses in need due to the
pandemic and natural disasters. The cloud-based, third-party systems we reviewed had to
concurrently meet emergency needs and process personally identifiable information. OMB
Circular No. A-123 and FISMA guidance requires agency management to validate the
adequacy of controls by third-party service providers.
In addition, Presidential Executive Order 14028 states the federal government must
rapidly improve the security and integrity of critical software supply chains, further
reinforcing requirements for federal agencies to exercise due diligence over cybersecurity.
OMB Memorandum M-22-01 sets forth the guidance to comply with the Executive Order to
improve visibility into and detection of cybersecurity vulnerabilities and threats to the
federal government.
Results
The objective was to determine what internal controls the organization designed to
address system cybersecurity risks caused by COVID 19 and disaster economic relief
transactions. We assessed whether management effectively designed, implemented, and
monitored IT controls, such as authorization to operate procedures, security, privacy,
incident response, contract compliance, and system development for three disaster
assistance systems.
We found the agency’s entity-level control environment was not designed in accordance
with federal guidance at the beginning of the COVID-19 assistance programs. The agency
allowed the third-party systems to be put into service without conducting the baseline
assessments. With no baseline, the agency could not perform effective continuous
monitoring. Also, we found that control processes did not identify, communicate, and
capture privacy and identity risks on an enterprise-wide basis.
3
Finding 1: SBA’s Entity-level Control Activities Were Not
Effectively Designed
Entity-level control is a primary step to ensure the systems of internal controls are
operating effectively and are consistently designed. According to the Government
Accountability Office’s (GAO) Standards for Internal Control in the Federal Government,
entity-level controls have a pervasive effect on an entity’s internal control system and
include controls related to the entity’s risk assessment process, control environment,
service organizations, management override, and monitoring.
We found that SBA ineffectively designed and implemented entity-level controls as they
provided quick delivery of disaster assistance during the pandemic. This occurred because
SBA did not:
• perform entity-wide security risk management assessments;
• update the agency’s system development methodology;
• obtain and review System and Organization Controls (SOC) assurance reports; and
• perform validations on third-party system security functionalities.
GAO standards require agency management to design control activities for appropriate
coverage of objectives and risks in operations. Control activities are the actions
management establishes through policies and procedures to achieve objectives and
respond to risks in the internal control system, which includes the agency’s information
system.
Management designs entity-level control activities so that the agency meets its objectives
and addresses related risks, and these activities ensure information technology continues
to properly operate.
Perform Entity-wide Security Risk Management Assessments
SBA did not have an effective process for ensuring privacy and identity risks were captured
and communicated on an enterprise-wide basis. GAO’s Standards for Internal Control in the
Federal Government states management must identify enterprise risks and develop needed
risk responses. Subsequently, management must design control activities to address
identified risk responses.
During the period of our review, three security incidents occurred on the Disaster Credit
Management System (DCMS) Disaster Loan Application Portal (DLAP), an outward facing,
high-value asset system designed to provide disaster assistance. Additional potential
privacy and identity internal control weaknesses in other disaster areas were identified
and communicated by OIG in memorandums, reports, and recommendations.
The most recent DCMS/DLAP security incident reported in January 2022 showed
misappropriation of personal addresses and other PII data. SBA subsequently implemented
automated privacy internal controls to ensure PII was accurate, timely, and complete.
However, these controls were designed and implemented a year after the system went into
production. These areas included privacy risks related to identity theft, misappropriated
social security numbers, and modified applicant addresses.
4
In addition, we were unable to obtain evidence that previously identified privacy and
identity risks from other disaster assistance systems were considered for mitigation in
control baselines and communicated on an enterprise-wide basis. OMB A-130 states
privacy and security controls must be considered before a system is put into production
and periodically monitored. A baseline is a set of minimum-security controls defined for an
information system. While the agency through the Enterprise Cybersecurity Service
responds to security incidents, improvement is needed to ensure identity and privacy risks
are fully integrated into the risk management process. This activity will help ensure more
effective system control designs are implemented and monitored for all agency systems.
Update the Agency’s System Development Methodology
SBA’s System Development Methodology document was last updated in 2009 and was not
consistent with current federal requirements. Consequently, the methodology provided
only limited system design guidance.
The system development methodology sets out the structure for the design, acquisition,
development, and maintenance of information technology. The system development
methodology is a method used to validate whether controls, such as system requirements,
approvals, and processes, have been properly designed and implemented and operate
effectively.
The agency’s 2009 System Development Methodology document did not provide
procedural guidance over supply chain risk-management practices or high-value asset
system designation.
We determined supply chain risk management practices, which also include accelerated
system acquisition guidance, were not incorporated into the System Development
Methodology. Supply chain risk management is a systematic process for managing
vulnerabilities throughout the supply chain and developing response strategies to the
unique risks presented by third-party suppliers. The agency had a Supply Chain Risk
Management Implementation Plan, but it had not been integrated into the System
Development Methodology, and it did not provide specific implementation procedures. For
example, the plan did not address accelerated system development for new technologies.
OMB Circular A-130 requires agencies to consider supply chain security control issues as a
part of their resource planning and management activities throughout the system
development life cycle to appropriately manage risks.
We also determined the current System Development Methodology did not include
guidance to identify, categorize, and prioritize critical systems as high-value assets. We
found that the systems used for COVID-19 assistance programs were not identified as high-
value assets based on a review of the systems’ descriptions in their respective security
plans. OMB M-19-03 allows agencies to designate any system whose functionality impacts
the organization’s ability to perform its mission as a high-value asset. In addition, agencies
are required to take a strategic, enterprise-wide view of cyber risk to protect high-value
assets against cyber threats.
A high-value asset is a system critical to an organization because the loss or corruption of
information could cause a serious impact to the agency’s ability to perform its mission.
5
High-value asset system identification and categorization is a necessary security function
that when appropriately designed helps safeguard agency information systems.
When system development methodologies do not include supply chain and high-value
asset designation guidance, management may make uninformed decisions about system
design, acquisition, and development that could result in the deployment of systems that do
not fully meet agency operational and mission goals.
Obtain and Review System and Organization Controls (SOC)
Assurance Reports
We found management did not obtain reasonable assurance of the design, implementation,
and operating effectiveness of internal controls of the third-party information systems.
Management also did not provide evidence that user entity controls were effectively
designed, implemented, and operated as intended. The agency is required to obtain
assurance that third-party internal controls function as represented. This independent
assurance is the purpose of a SOC 1 Type 2 report. OMB Circular No. A-123 requires
management to validate the adequacy of controls by third-party service providers using an
independent evaluation such as the SOC 1 Type 2 report. It provides assurance that
reported financial data is complete and reliable.
Independent third-party assurance of financial controls minimizes the risk of inaccurate
financial reporting through validation of related integrity controls. However, we found
billions of federal assistance dollars were being processed through the systems without
assurance that the controls were operating as intended. SBA was unable to obtain
reasonable assurance regarding the reliability and integrity of reported financial data,
which contributed to two disclaimer3 audit opinions for fiscal years 2020 and 2021.
Perform Validations on Third-party System Security
Functionalities
SBA did not provide documentation to validate that system functionality and security was
included and reviewed in the acquisition contracts. Acquisition controls play a significant
role in the effective management of an information system. Effective communication and
coordination of activities throughout system development depends on complete and
accurate documentation of decisions and activities leading up to decisions. Activities and
decisions should not be considered complete until there is tangible documentation of the
activity or decision. We found the agency lacked documentation in areas of system
development, as follows:
3 A disclaimer of opinion results when an auditor cannot obtain sufficient information to render an opinion on an
organization’s financial statements.
6
• The acquisition contract for one of the two systems we audited did not include
required acceptance criteria. The contract was signed without explicit expectations
of the minimum desired acceptable system functionality.
Acceptance criteria specify the minimum desired functionality acceptable for a
system to be put into operation as a usable platform despite known risks and
uncertainties. National Institute of Standards and Technology (NIST) Special
Publication (SP) 800-53 Revision (Rev.) 5 recommends acquisition contracts to
define user acceptance criteria.
• SBA did not independently verify the system specifications using a requirements
traceability matrix and test plans for either information system although SBA policy
requires a traceability matrix. Requirements traceability validates that the system
specifications are carried through to the design, build, and evaluation stages to
ensure the system operates as intended. The requirements traceability matrix is an
essential reference for the system specifications, test strategy, and allocation of
requirements to acceptance criteria.
• The Office of the Chief Information Officer did not provide evidence that they
reviewed the third-party service provider contracts in coordination with the system
owners and the contracting office. OMB Circular A-130 and Standard Operating
Procedure (SOP) 90 47 6 require the Office of the Chief Information Officer to
ensure that the terms and conditions in contracts involving the collection, use, and
processing of federal information incorporate security and privacy requirements4 to
protect federal information. Security and privacy requirements in the contract
provide reasonable assurance that security can be enforced, including activities
performed by third-party service providers.
The agency’s priority to provide economic assistance as quickly as possible resulted in
management not following all the applicable requirements for systems development, such
as developing traceability matrixes, acceptance criteria, and documenting contract review
of security requirements.
Management cannot validate that acceptance criteria has been met and all system
specifications have been tested and verified without a requirements traceability matrix. In
addition, management cannot enforce security controls that are not specified in third-party
contracts and validated by the Office of the Chief Information Officer. In such cases, the
information systems may not achieve the intended purposes and could prevent the agency
from achieving its mission to provide timely disaster assistance and ensure program
eligibility requirements are maintained. In addition, these controls are essential to ensure
protections are in place over applicants’ personally identifiable information and other
sensitive data.
4 All applicable NIST SP 800-53 controls should be put on contract for all contractor and outsourced operations.
7
Recommendations
We recommend the Administrator direct the Office of the Chief Information Officer to do
the following:
1. Ensure the existing SBA System Development Methodology is updated to include
supply chain risk-management practices as required by OMB Circular A-130 and
high-value asset system designation guidance. Also, ensure high-value asset system
risks are incorporated into the enterprise risk management framework, as
recommended by OMB M-19-03 and SBA SOP 90 47 6.
2. Communicate and enforce the SBA System Development Methodology in which a
traceability matrix is used to ensure that system requirements can be tested and
demonstrated in the operational system. Ensure all requirements are aligned with
the contractual acceptance criteria.
3. Implement in updated agency guidance, the requirements of OMB Circular No. A-
123 that stipulate a SOC 1 Type 2 report is needed for all new and existing financial
systems. This guidance should also require confirmation at least annually that the
controls are functioning as designed.
4. Enforce the requirement to establish and implement internal controls to ensure
appropriate program officials perform and document contract reviews to ensure
that information security is appropriately addressed in the contracting language, as
required by OMB Circular A-130 and SBA SOP 90 47 6.
5. In conjunction with the Enterprise Risk Management Board, implement enterprise-
wide privacy risk mitigation practices that can be assimilated into new and existing
system program designs.
8
Finding 2: SBA’s Entity-level Monitoring Activities Need
Improvement
We determined SBA was unable to continuously monitor system security because of
inconsistently established baselines for third-party information systems. The baseline
consists of issues and deficiencies initially identified in an entity’s internal control system.
GAO Standards for Internal Control in the Federal Government requires agencies to establish
a baseline to continuously monitor the internal control system.
Continuous monitoring activities offer the organization better visibility into the state of
security for its information systems. Continuous monitoring means maintaining ongoing
awareness of information security, vulnerabilities, threats, and incidents to support agency
risk management decisions.
Complete Authorization to Operate Procedures Before
Launching New Systems
The agency did not fully implement a robust control baseline that addressed the need for
essential security controls and continuous monitoring. SBA’s capability to implement
continuous monitoring requirements is essential to ensure integration with the agency’s
existing systems and prevent loss or corruption of data. According to SBA officials, this
capability was adversely affected because of the agency’s priority to provide urgent
economic assistance during the COVID-19 pandemic. The vehicles used to establish and
monitor these baseline activities include the development of an assessment and
authorization package;5 monitoring efforts that include updates to this package; and
periodic evaluations of the effectiveness of controls through the vehicles such as the Plans
of Action & Milestone (POA&M) process.
We found these control activities were not effectively performed in accordance with SBA
SOP 90 47 6. Specifically, the agency did not perform a complete assessment and
authorization when these systems were put into operation (see Table 1). We also found the
agency did not update the authorization package annually as part of the information
system continuous monitoring program. The agency also did not perform continuous
monitoring of system weaknesses because the POA&Ms were not documented until 10 and
13 months after the two information systems were put into operation (see Table 1 – Plan of
Action and Milestones).
In addition, any probable high-value asset POA&Ms rated critical or high were not
remediated within 30 days as required by policy because they were not identified for 10 or
13 months. POA&M information is used to allocate risk mitigation resources for system
weaknesses and deficiencies. POA&Ms are supposed to be updated quarterly as part of the
5 The assessment and authorization process is a baseline analysis of security and privacy controls. It is used to evaluate the internal
control system, support information system risk management, and monitor security controls for effectiveness. At a minimum, the
assessment and authorization package includes the following components: information system security plan, privacy plan, security
control assessments, privacy control assessments, and Plans of Action and Milestones.
9
continuous monitoring program as required by agency policy and the Federal Information
Security Management Act.
Table 1. Completion Timeframes for Required Assessment and
Authorization Components in Third-Party Systems Tested
Required Component
Months Completed
After Operation for
System 1
Months Completed
After Operation for
System 2
System Security Plan
14 months
9 months
Security and Risk
Assessment Report
Incomplete
Incomplete
Security Assessment Plan
13 months
10 months
Privacy Impact
Assessment
14 months
Completed
Privacy Threshold
Analysis
14 months
Completed
Plan of Action and
Milestones
13 months
10 months
Executive Summary
Incomplete
Incomplete
Authority To Operate
Letter
11 months
Completed
Source: OIG analysis prepared as of June 4, 2021
OMB Circular No. A-130 requires agencies to conduct and document initial assessments
and authorizations prior to systems being put into operation. Without performing initial or
ongoing assessments and authorization, management may not be able to make informed
decisions about the security and privacy controls that must be implemented to ensure
mission-critical systems are designed and operate effectively in a highly dynamic
environment.
Complete Data Sharing Agreements Prior to Operation
We found data-sharing agreements for the two third-party systems under review were
completed 6 and 10 months after they were put into operation. Data sharing agreements
ensure controls are in place when data is exchanged between external systems or other
federal systems to ensure the proper protection and use of mission-critical, sensitive data.
Data sharing agreements are used to plan, manage, and execute information exchange
procedures.
Data sharing agreements were not completed at the time of operation due to the priority of
delivering assistance to small business applicants. SBA SOP 90 47 6 requires that a written
management agreement for system interconnections be obtained prior to connecting to a
system and reviewed annually per the SBA Information System Continuous Monitoring
Plan.
Because SBA did not have a completed data sharing agreement, there was no assurance the
data used in data sharing agreements with contractors was protected because there was
nothing binding parties to the requirements to address security controls that protect the
confidentiality, integrity, and availability of the data transmissions used to process COVID-
19 disaster assistance and loan forgiveness.
10
Enhance Monitoring Capabilities through Automation
The agency was unable to provide evidence they have automated configuration
management monitoring capabilities as specified in FISMA guidance. FISMA criteria states
an effective level of security includes the use of automated tools to improve the accuracy,
consistency, and availability of configuration baseline information.
Agency management manually recorded changes (e.g., system enhancements, fixes, etc.) to
one of the three systems in the audit scope. Managing the numerous configurations found
within information systems has become almost impossible using manual methods.
Automated solutions help lower the cost of configuration management efforts while
enhancing efficiency and improving reliability.
Agency management accepted a manual tool to track configuration management. NIST SP
800-53 Rev. 5 Configuration Management-3 states “The organization documents
configuration change decisions associated with the information system.” Manual records
are insufficient to verify configuration testing and acceptance protocols because it is
possible all changes to the system may not be captured or fully authorized.
Recommendations
We recommend that the Administrator direct the Office of the Chief Information Officer and
the Office of Capital Access collaborate with program officials to:
6. Complete an initial assessment and authorization for each information system and
all agency-designated common controls before operation.
7. Transition information systems and common controls to an ongoing authorization
process (when eligible for such a process) with the formal approval of the
respective authorizing officials or reauthorize information systems and common
controls as needed, on a time or event-driven basis in accordance with agency risk
tolerance, as required by OMB Circular No. A-130 and SOP 90 47 6.
8. Review and update POA&Ms at least quarterly as required by SOP 90 47 6.
9. Ensure data-sharing agreements are reviewed annually as required by SBA SOP 90
47 6.
10. Implement an automated process to document and monitor system changes as
recommended by NIST SP 800-53 Rev. 5.
11
Analysis of Agency Response
Management provided formal comments, included in Appendix II. SBA management fully
agreed with seven recommendations, disagreed with two recommendations, and stated
one recommendation was specific to the pandemic and will not likely be repeated. While
the agency agreed to implement seven recommendations, management’s planned
corrective actions did not fully address identified control issues.
In the recommendations where SBA disagreed with the findings, the identified issues were
related to implementation of controls established in federal guidance. These
recommendations convey the need for the agency to establish robust control baselines to
ensure essential security controls are in place and effective. Federal guidance reinforces
this need through SOP 90 47 6, which states that an assessment and authorization must be
completed prior to a system being placed into production, or if there is a significant change
in the system. Also, GAO’s Standards for Internal Control in the Federal Government states
that agency management holds third-party applications responsible for internal controls
and ensures that those controls are effective.
In addition, SBA’s management response did not fully address control issues identified in
each recommendation or provide a final action target date. As a result, we consider all the
recommendations as unresolved. In accordance with our audit follow-up policy, the
proposed resolution steps and final action dates will be provided by the agency in
subsequent correspondence. If management and OIG do not reach agreement on
unresolved recommendations within 60 days after the date of this final report, OIG will
notify the audit follow-up official of the disputed issue(s).
Summary of Actions Necessary to Close the Recommendations
The following list explains the status of each of our recommendations in the report and the
actions we deem necessary to close them:
Recommendation 1: Ensure the existing SBA System Development Methodology is
updated to include supply chain risk management practices as required by OMB Circular A-
130 and high-value asset system designation guidance. Also, ensure high-value asset
system risks are incorporated into the enterprise risk management framework, as
recommended by OMB M-19-03 and SBA SOP 90 47 6.
Status: Unresolved
SBA management agreed with this recommendation and stated SBA will endeavor to
improve its System Development Methodology and underlying principles, to include testing
for core application functionality. Management’s comments were not fully responsive to
the recommendation because they did not address the risks identified, such as the need to
provide procedural guidance over supply chain risk management practices or high-value
asset systems designation.
This recommendation can be closed when management provides evidence that SBA revised
its System Development Methodology document with procedural guidance over supply
chain risk management practices and high-value asset system designation. Management
12
will also need to provide evidence that the agency has incorporated high-value asset
systems risks into the enterprise risk management framework.
Recommendation 2: Communicate and enforce the SBA System Development
Methodology in which a traceability matrix is used to ensure that system requirements can
be tested and demonstrated in the operational system. Ensure all requirements are aligned
with the contractual acceptance criteria.
Status: Unresolved
SBA management agreed and stated they will endeavor to improve its System Development
Methodology and underlying principles, to include testing for core application
functionality. Management’s comments were not responsive to the recommendation
because they did not address the need to provide procedural guidance over the use of a
traceability matrix to ensure system requirements can be delivered.
This recommendation can be closed when the Office of the Chief Information Officer
provides evidence that the agency has issued updated systems development guidance that
includes the use of a traceability matrix to ensure system requirements can be tested. The
agency will also need to provide evidence that they have established the requirement for
design and testing of system controls prior to putting applications into production.
Recommendation 3: Implement in updated agency guidance, the requirements of OMB
Circular No. A-123 that stipulate a SOC 1 Type 2 report is needed for all new and existing
financial systems. This guidance should also require confirmation at least annually that the
controls are functioning as designed.
Status: Unresolved
SBA management did not state agreement or disagreement with this recommendation.
They stated that the exigent circumstances caused by the COVID-19 pandemic, reinforced
by legislative requirements, did not permit sufficient time for such a formalized third-party
audit as recommended. SBA further believes that this condition has been overcome by
events.
The agency’s comments did not fully address the recommendation. Specifically, A-123
requires the agency to obtain an independent evaluation of third-party financial systems.
These evaluations allow agency managers to meet A-123 requirements to continuously
monitor, assess, and improve the effectiveness of internal controls. The agency needs to
update its guidance to ensure the independent control assessments are performed annually
or as required.
This recommendation can be closed when management provides evidence that it has
implemented updated guidance in accordance with A-123. The updated policy should
require management to validate the adequacy of controls by third-party service providers
using an independent evaluation, such as the SOC 1 Type 2 report. This updated policy
applies to existing and future contracts for third-party IT financial systems.
Recommendation 4: Enforce the requirement to establish and implement internal
controls to ensure appropriate program officials perform and document contract reviews
13
to ensure that information security is appropriately addressed in the contracting language,
as required by OMB Circular A-130 and SBA SOP 90 47 6.
Status: Unresolved
SBA management agreed with this recommendation and stated they will consider updates
to its mandatory cybersecurity language for IT acquisitions. SBA management comments
were not responsive to the recommendation. The agency’s response did not definitively
state that they would include requirements to conduct contract document reviews in
accordance with OMB A-130. This criteria requires the Office of the Chief Information
Officer to ensure that the terms and conditions in contracts incorporate security and
privacy control guidance to protect federal information.
This recommendation can be closed when SBA management provides evidence system
functionalities are validated and security provisions are reviewed and included in contract
language in accordance with OMB A-130.
Recommendation 5: In conjunction with the Enterprise Risk Management Board,
implement enterprise-wide privacy risk mitigation practices that can be assimilated into
new and existing system program designs.
Status: Unresolved
SBA management agreed and stated they are in the process of establishing more granular
and frequent interfacing with the Enterprise Risk Management Board with regard to
privacy and cybersecurity risk. Management’s comments were not responsive to the
recommendation because they did not definitively state that management would establish
a process to update control designs related to PII incidents in a timely manner and ensure
updated controls are considered for all other SBA systems.
GAO’s Standards for Internal Control in the Federal Government requires management to
design the entity’s information system to obtain and process information to meet each
operational process’s information requirements and to respond to the entity’s objectives
and risks. Our report found that more security oversight is needed because the frequency
of security incidents on outward facing systems increases the potential of compromising
PII data.
This recommendation can be closed when the Office of the Chief Information Officer
provides evidence that SBA has an effective process to ensure privacy and identity risks are
captured and communicated across the agency.
Recommendation 6: Complete an initial assessment and authorization for each
information system and all agency designated common controls before operation.
Status: Unresolved
SBA management disagreed with this recommendation. SBA stated that there is not always
a cause-effect relationship, as inferred from the draft report, between the risk management
and assessment activities conducted on a particular IT environment and the subsequent
improper use of that same IT environment after authorization. The agency’s response did
not acknowledge that these initial and ongoing assessments and authorizations are needed
to provide assurance that security and privacy controls perform as intended. OMB Circular
14
No. A-130 requires agencies to conduct and document initial assessments and
authorizations prior to systems being put into operation.
This recommendation can be closed when the Office of the Chief Information Officer
provides evidence management has implemented a process for conducting an initial
assessment and authorization for each information system and all agency designated
common controls before operation, and documentation to demonstrate that the process is
occurring.
Recommendation 7: Transition information systems and common controls to an ongoing
authorization process (when eligible for such a process) with the formal approval of the
respective authorizing officials or reauthorize information systems and common controls
as needed, on a time or event-driven basis in accordance with agency risk tolerance, as
required by OMB Circular No. A-130 and SOP 90 47 6.
Status: Unresolved
Management disagreed with this recommendation stating that the specific type of
authorization received by a particular IT environment, point-in-time authorization or
ongoing authorization, was not a factor in the use or misuse of SBA’s pandemic response IT
systems implementations. The agency’s response does not acknowledge that this control
oversight was essential during the pandemic and would be problematic in response to
future events. SBA’s responsibilities are mandated by OMB Circular A-130 and SOP 90 47 6.
These policies require agency-wide risk mitigation controls that prevent loss or corruption
of data, as well as address potential identity and privacy risks.
This recommendation can be closed when SBA provides evidence that the agency performs
timely authorizations for new and existing systems in accordance with OMB A-130 and SOP
90 47 6.
Recommendation 8: Review and update Plan of Action & Milestones (POA&M) at least
quarterly as required by SOP 90 47 6.
Status: Unresolved
SBA management agreed with this recommendation but stated they believe that the
condition has been overcome by events. We disagree that the conditions are overcome by
events because we found the agency was non-compliant with the Federal Information
Security Management Act which requires quarterly review and remediation of all systems
through POA&Ms.
This recommendation can be closed when the Office of the Chief Information Officer
provides evidence that all SBA’s systems are monitored in accordance with FISMA POA&M
guidance and SOP 90 47 6. This guidance further requires information be used to allocate
risk mitigation resources for system weaknesses and deficiencies.
Recommendation 9: Ensure data sharing agreements are reviewed annually as required
by SBA SOP 90 47 6.
Status: Unresolved
15
SBA management agreed with this recommendation but stated they believe that the
condition has been overcome by events. OIG disagrees that the conditions are overcome by
events because SBA has existing data sharing agreements and will continue to enter into
agreements. The agreements must be reviewed annually in accordance with SOP 90 47 6.
This recommendation can be closed when the Office of the Chief Information Officer
provides evidence data sharing agreements are completed at the time of operation and
annually thereafter in accordance SBA SOP 90 47 6.
Recommendation 10: Implement an automated process to document and monitor system
changes as recommended by NIST SP 800-53 Rev. 5.
Status: Unresolved
SBA management agreed with this recommendation and stated they will evaluate options
for automating its change management process for IT systems and applications. SBA
management comments were not responsive to the recommendation because they did not
provide an implementation plan for this automated configuration capability.
This recommendation can be closed when the agency provides evidence it has automated
configuration management monitoring capabilities for third-party applications as
recommended by NIST SP 800-53 Rev. 5.
16
Appendix I: Objective, Scope, and Methodology
Our objective was to determine what internal controls the organization designed to
address third-party contractor system cybersecurity risks caused by COVID and disaster
economic relief transactions. The scope of the audit included SBA’s management of control
activities and monitoring of the third-party service provider information systems. We also
considered organizational control activities related to the design of a disaster assistance
delivery system that incurred a security incident in January 2022.
We assessed whether management effectively designed and implemented third-party
oversight controls to address security, privacy, incident response, contract compliance,
system development, and assessment and authorization controls. Additionally, we
considered the findings and conclusions developed by the Fiscal Years 2020 and 2021
Independent Public Accountant because it also addressed third-party oversight controls for
the two systems in this audit scope. The period of review was March 20, 2020 through
March 31, 2022.
We reviewed agency policies, procedures, practices, and organizational structures designed
to provide a reasonable assurance that business objectives will be achieved and that
undesired events will be prevented, detected, and corrected.
We conducted this performance audit in accordance with generally accepted government
auditing standards. Those standards require that we plan and perform the audit to obtain
sufficient, appropriate evidence to provide a reasonable basis for our findings and
conclusions based on our audit objectives. We believe that the evidence obtained provides
a reasonable basis for our findings and conclusions based on our audit objectives.
Use of Computer-Processed Data
We used computer-processed data as a part of our audit procedures. We determined the
use of computer-processed data did not materially affect our audit findings, conclusions, or
recommendations and the risk of using such data without an assessment was deemed
acceptable.
We relied on information used for widely accepted purposes and obtained from sources
generally recognized as appropriate, such as data obtained from the Independent Public
Accountant. Consequently, we did not need to establish the accuracy, completeness, and
validity of the data. As a result, we did not perform an assessment of data produced by the
information systems because these procedures were deemed to be out of scope.
Our opinion is solely based on the result of our testing of sampled items selected for
review. We believe the data is sufficiently reliable to support our conclusions.
Assessment of Internal Controls
OMB Circular No. A-123 provides the specific requirements for how to perform evaluations
and report on internal controls in the federal government.
OMB Circular No. A-123 requires federal government agencies to implement a
comprehensive system of internal controls that provides reasonable assurance that agency
17
programs are designed, implemented, and operating as intended; and to evaluate the
effectiveness of internal controls. It also requires agencies to integrate risk management
and internal control functions. The Circular also establishes an assessment process based
on the Government Accountability Office’s (GAO) Standards for Internal Control in the
Federal Government (known as the Green Book) that management must implement the
following five components of internal control framework:
1. Control Environment
2. Risk Assessment
3. Control Activities
4. Information
5. Communication and Monitoring
Management is also required to assess the design, implementation, and operating
effectiveness of the entity’s internal controls to determine if an internal control system is
effective.
We identified control activities, monitoring, and the associated principles as material or
significant internal control components of this audit. We found the agency ineffectively
designed control activities and monitoring as detailed in our audit findings and made
recommendations that address the identified issues.
Prior Audit Coverage
Report Title
Report Number
Final Report Date
Inspection of Small
Business Administration’s
Initial Disaster Assistance
Response to the
Coronavirus Pandemic
21-02
October 28, 2020
Independent Auditors’
Report on SBA’s FY 2020
Financial Statements
21-04
December 18, 2020
SBA’S Handling of Identity
Theft in the COVID-19
Economic Injury Disaster
Loan Program
21-15
May 6, 2021
Weaknesses Identified
During the FY 2020
Federal Information
Security Modernization
Act Review
21-17
July 6, 2021
Independent Auditors’
Report on SBA’s FY 2021
Financial Statements
22-05
November 15, 2021
18
Appendix II: Management Comments
SBA RESPONSE TO AUDIT REPORT
Memo for:
Hannibal Ware
Inspector General
From:
Stephen Kucharski
Acting Chief Information Officer
Francisco Sanchez Jr.
Associate Administrator, Office of Disaster Assistance
Subject:
Management Response:
Draft Report on COVID-19 and Disaster Assistance
Information Systems Security Controls
Project 20020
Date:
August 18, 2022
We appreciate the opportunity to review the document entitled “Draft Report on COVID-19
and Disaster Assistance Information Systems Security Controls.” While we feel that the
draft report reflects work done in earnest and with noble intentions, we feel that the report
pays inadequate consideration to key facts regarding the significant restrictions mandated
upon the SBA by pandemic response legislation, causing management to significantly
deviate from its established processes.
The SBA has the following comments with respect to the recommendations:
Recommendations 1 and 2: The SBA agrees. The SBA will endeavor to improve its
System Development Methodology (SDM) and underlying principles, to include testing for
core application functionality
Recommendation 3: The SBA believes that the exigent circumstances caused by the
COVID-19 pandemic, reinforced by legislative requirements, did not permit sufficient time
for such a formalized third-party audit as recommended. The SBA further believes that this
condition has been overcome by events.
Recommendation 4: The SBA agrees. The SBA will consider updates to its mandatory
cybersecurity language for IT acquisitions.
Recommendation 5: The SBA agrees. The SBA is in the process of establishing more
granular and more frequent interfacing with the ERM Board with regard to privacy and
cybersecurity risk.
Recommendation 6: The SBA does not agree. The SBA believes that there is not always a
cause-effect relationship, as is inferred from the draft report, between the risk management
and assessment activities conducted on a particular IT environment, and the subsequent
improper use of that same IT environment after authorization.
Recommendation 7: The SBA does not agree. The SBA feels that the specific type of
authorization received by a particular IT environment, point-in-time authorization or
ongoing authorization, was not a factor in the use or misuse of the SBA’s pandemic
response IT systems implementations.
Recommendation 8 and 9: The SBA agrees; however, the SBA believes that these
conditions have been overcome by events.
Recommendation 10: The SBA agrees. The SBA will evaluate options for automating its
change management process for IT systems and applications.