Pandemic Darlings The pandemic economy, in original documents
Home Source documents PCS for HB 1059 (2021): An act relating to construction permits

PCS for HB 1059 (2021): An act relating to construction permits

Summary

A proposed committee substitute, PCS for HB 1059, of 2021, a bill to be entitled an act relating to construction permits. It amends sections 125.022, 125.56, 166.033, 553.79, 553.792, 553.794 and 713.135 of the Florida Statutes, covering when counties and municipalities request additional information on permit applications, online posting and electronic submission of building permit applications, and a reduction of fees in certain circumstances. New subsection (6) of section 713.135 provides that an authority that issues building permits may not require a direct contract or a contract between a contractor and any other lienor as a condition of a permit application for commercial property. Section 8 sets an effective date of October 1, 2021.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“PCS for HB 1059 (2021): An act relating to construction permits.” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2021-3101-regulatory-reform-subcommittee-proposed-committee-bills-pcbs-0db5b76125/, SHA-256 25c3bd0a4de77aef981b936187435b9d390fa91d629df3339b1a30289505cd9c.

Full text

F   L      O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




           PCS for HB 1059                                                                                      2021




    1                                         A bill to be entitled
    2              An act relating to construction permits; amending
    3              125.022, F.S.; amending the requirements for when
    4              counties request certain information; amending 125.56,
    5              F.S.; amending the requirements that counties post
    6              building permit applications and its procedures for
    7              reviewing applications online and allow applicants to
    8              submit applications electronically; amending 166.033,
    9              F.S.; amending the requirements for when
10                 municipalities request certain information; amending
11                 553.79, F.S.; amending the requirements that local
12                 governments post building permit applications and its
13                 procedures for reviewing applications online and allow
14                 applicants to submit applications; providing for a
15                 reduction of fees in certain circumstances; requiring
16                 certain surcharges be recalculated under certain
17                 conditions; amending 553.792, F.S.; providing for a
18                 reduction of fees in certain circumstances; requiring
19                 certain surcharges be recalculated under certain
20                 conditions; amending s. 553.794, F.S.; providing for a
21                 reduction of fees in certain circumstances; requiring
22                 certain surcharges be recalculated under certain
23                 conditions; amending 713.135, F.S.; providing that
24                 building permit authorities may not require applicants
25                 to provide certain contracts for certain types of

                                                         Page 1 of 12
        PCS for HB 1059
        CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                        V
F   L   O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




        PCS for HB 1059                                                                                      2021




26              building permits; providing an effective date.
27
28      Be It Enacted by the Legislature of the State of Florida:
29
30              Section 1.         Subsection (2) of section 125.022, Florida
31      Statutes, is amended to read:
32              125.022       Development permits and orders.—
33              (2)(a)       When reviewing an application for a development
34      permit or development order that is certified by a professional
35      listed in s. 403.0877, a county may not request additional
36      information from the applicant more than three times, unless the
37      applicant waives the limitation in writing.
38              (b)       If a county makes a request for additional information
39      and the applicant submits the required additional information
40      within 30 days of receiving the request, the county must review
41      the application for completeness and issue a letter indicating
42      that all required information has been submitted or specify with
43      particularity any areas that are deficient within 30 days of
44      receiving the additional information.
45              (c)       If a county makes a second request for additional
46      information and the applicant submits the required additional
47      information within 30 days of receiving the request, the county
48      must review the application for completeness and issue a letter
49      indicating that all required information has been submitted or
50      specify with particularity any areas that are deficient within

                                                      Page 2 of 12
     PCS for HB 1059
     CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                     V
F   L   O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




        PCS for HB 1059                                                                                      2021




51      10 days of receiving the additional information.
52              (d) Before a third request for additional information, the
53      applicant must be offered a meeting to attempt to resolve
54      outstanding issues. If a county makes a third request for
55      additional information and the applicant submits the required
56      additional information within 30 days of receiving the request,
57      it must deem the application complete within 10 days or proceed
58      to process the application for approval or denial unless the
59      applicant waived the county’s limitation in writing described in
60      paragraph (a).
61              (e) Except as provided in subsection (5), if the applicant
62      believes the request for additional information is not
63      authorized by ordinance, rule, statute, or other legal
64      authority, the county, at the applicant's request, shall proceed
65      to process the application for approval or denial.
66              Section 2.         Paragraph (b) of subsection (4) of section
67      125.56, Florida Statutes, is amended, and a new paragraph (f) is
68      added to that subsection to read:
69              125.56       Enforcement and amendment of the Florida Building
70      Code and the Florida Fire Prevention Code; inspection fees;
71      inspectors; etc.—
72              (4)
73              (b)       A county that issues building permits shall post each
74      type of building permit application, including a list of all
75      required attachments, drawings, or other requirements for each

                                                      Page 3 of 12
     PCS for HB 1059
     CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                     V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




76       type of application, on its website. A county must post and
77       update the status of every received application on its website
78       until the issuance of the building permit. Completed
79       applications, including payments, attachments, drawings, or
80       other requirements or parts of the completed permit application,
81       must be able to be submitted electronically to the county
82       building department. Accepted methods of electronic submission
83       include, but are not limited to, e-mail submission of
84       applications in Portable Document Format or submission of
85       applications through an electronic fill-in form available on the
86       building department's website or through a third-party
87       submission management software. Completed applications,
88       including payments, attachments, or drawings, or other
89       requirements or parts required as part of the completed permit
90       application, may also be submitted in person in a nonelectronic
91       format, at the discretion of the building official.
92               (f)       A county that issues building permits must post its
93       procedures for processing, reviewing, and approving submitted
94       building permit applications on its website.
95               Section 3.         Subsection (2) of section 166.033, Florida
96       Statutes, is amended to read:
97               166.033       Development permits and orders.—
98               (2)(a)       When reviewing an application for a development
99       permit or development order that is certified by a professional
100      listed in s. 403.0877, a municipality may not request additional

                                                       Page 4 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




101      information from the applicant more than three times, unless the
102      applicant waives the limitation in writing.
103              (b)       If a municipality makes a request for additional
104      information and the applicant submits the required additional
105      information within 30 days of receiving the request, the
106      municipality must review the application for completeness and
107      issue a letter indicating that all required information was
108      submitted or specify with particularity any areas that are
109      deficient within 30 days of receiving the additional
110      information.
111              (c) If a municipality makes a second request for additional
112      information and the applicant submits the required additional
113      information within 30 days of receiving the request, the
114      municipality must review the application for completeness and
115      issue a letter indicating that all required information was
116      submitted or specify with particularity any areas that are
117      deficient within 10 days of receiving the additional
118      information.
119              (d) Before a third request for additional information, the
120      applicant must be offered a meeting to attempt to resolve
121      outstanding issues. If a municipality makes a third request for
122      additional information and the applicant submits the required
123      additional information within 30 days of receiving the request,
124      it must deem the application complete within 10 days or proceed
125      to process the application for approval or denial unless the

                                                       Page 5 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




126      applicant waived the municipality’s limitation in writing
127      described in paragraph (a).
128              (e)       Except as provided in subsection (5), if the applicant
129      believes the request for additional information is not
130      authorized by ordinance, rule, statute, or other legal
131      authority, the municipality, at the applicant's request, shall
132      proceed to process the application for approval or denial.
133              Section 4.         Paragraph (b) of subsection (1) and subsection
134      (14) are amended, new paragraph (d) is added to that subsection
135      (1), to read:
136              553.79       Permits; applications; issuance; inspections.—
137              (1)
138              (b)       A local enforcement agency shall post each type of
139      building permit application, including a list of all required
140      attachments, drawings, or any other requirement for each type of
141      application, on its website. A local enforcement agency must
142      post the current status of every received application on its
143      website until the issuance of the building permit. Completed
144      applications, including payments, attachments, drawings, or any
145      other requirements or parts of the completed permit application,
146      must be able to be submitted electronically to the appropriate
147      building department. Accepted methods of electronic submission
148      include, but are not limited to, e-mail submission of
149      applications in Portable Document Format or submission of
150      applications through an electronic fill-in form available on the

                                                       Page 6 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




151      building department's website or through a third-party
152      submission management software. Completed applications,
153      including payments, attachments, or drawings, or any other
154      requirements or parts required as part of the completed permit
155      application, may also be submitted in person in a nonelectronic
156      format, at the discretion of the building official.
157              (d)       A local enforcement agency must post its procedures
158      for processing, reviewing, and approving submitted building
159      permit applications on its website.
160              (14)        A building permit for a single-family residential
161      dwelling must be issued within 30 business working days of
162      receiving the application therefor unless unusual circumstances
163      require a longer time for processing the application or unless
164      the permit application fails to satisfy the Florida Building
165      Code or the enforcing agency's laws or ordinances.
166              (a)       If a local enforcing agency fails to issue a building
167      permit for a single-family residential dwelling within 30
168      business days of receiving the application, it must reduce the
169      building permit fee by 10 percent for each business day that the
170      enforcing agency fails to meet the deadline. Each 10 percent
171      reduction shall be based on the original amount of the building
172      permit fee.
173              (b)       A local enforcing agency does not have to reduce such
174      fee, if the enforcing agency provides written notice to the
175      applicant, by e-mail or United States Postal Service, within 30

                                                       Page 7 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




176      business days of receiving the application, that specifically
177      states why the application fails to satisfy the Florida Building
178      Code, or the enforcing agency’s laws or ordinances.
179              (c)       The applicant has 10 business days to address the
180      reasons specified by the local enforcing agency and submit
181      revisions to correct the application. If the permit applicant
182      submits revisions within 10 business days of receiving the
183      notice, the local enforcing agency has 10 business days to
184      approve or deny the permit unless the applicant agrees to a
185      longer period in writing. If the local enforcing agency fails to
186      issue or deny the building permit within 10 business days of
187      receiving the revisions, it must reduce the permit fee by 20
188      percent for the first day that the enforcing agency fails to
189      meet the deadline unless the applicant agrees to a longer period
190      in writing. For each additional business day after the first day
191      that the enforcing agency fails to meet the deadline, the permit
192      fee must be reduced by an additional 10 percent for each
193      business day that the enforcing agency fails to meet the
194      deadline, for up to 5 business days. Each reduction shall be
195      based on the original amount of the building permit fee.
196              (d) If any permit fees are refunded under this subsection,
197      the surcharges provided for in s. 553.721 or s. 468.631 must be
198      recalculated based on the amount of the permit fees after the
199      refund.
200              Section 5.         Section 553.792, Florida Statutes, is amended

                                                       Page 8 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




201      to read:
202              553.792       Building permit application to local government.—
203              (1)(a)       Within 10 days of an applicant submitting an
204      application to the local government, the local government shall
205      advise the applicant what information, if any, is needed to deem
206      the application properly completed in compliance with the filing
207      requirements published by the local government. If the local
208      government does not provide written notice that the applicant
209      has not submitted the properly completed application, the
210      application shall be automatically deemed properly completed and
211      accepted. Within 45 days after receiving a completed
212      application, a local government must notify an applicant if
213      additional information is required for the local government to
214      determine the sufficiency of the application, and shall specify
215      the additional information that is required. The applicant must
216      submit the additional information to the local government or
217      request that the local government act without the additional
218      information. While the applicant responds to the request for
219      additional information, the 120-day period described in this
220      subsection is tolled. Both parties may agree to a reasonable
221      request for an extension of time, particularly in the event of a
222      force majeure major or other extraordinary circumstance. The
223      local government must approve, approve with conditions, or deny
224      the application within 120 days following receipt of a completed
225      application.

                                                       Page 9 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




226              (b)       If a local government does not meet a deadline
227      provided for in paragraph (a), it must reduce the building
228      permit fee by 10 percent for each business day that the
229      enforcing agency fails to meet the deadline. Each 10 percent
230      reduction shall be based on the original amount of the building
231      permit fee, unless the parties agree to an extension of time.
232              (2)(a)       The procedures set forth in subsection (1) apply to
233      the following building permit applications: accessory structure;
234      alarm permit; nonresidential buildings less than 25,000 square
235      feet; electric; irrigation permit; landscaping; mechanical;
236      plumbing; residential units other than a single family unit;
237      multifamily residential not exceeding 50 units; roofing; signs;
238      site-plan approvals and subdivision plats not requiring public
239      hearings or public notice; and lot grading and site alteration
240      associated with the permit application set forth in this
241      subsection. The procedures set forth in subsection (1) do not
242      apply to permits for any wireless communications facilities or
243      when a law, agency rule, or local ordinance specify different
244      timeframes for review of local building permit applications.
245              (b)       If a local government has different timeframes than
246      the procedures set forth in subsection (1) for reviewing
247      building permit applications described in paragraph (a), the
248      local government must meet the deadlines established by local
249      ordinance. If a local government does not meet an established
250      deadline to approve, approve with conditions, or deny an

                                                      Page 10 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




251      application, it must reduce the building permit fee by 10
252      percent for each business day the enforcing agency fails to meet
253      the deadline. Each 10 percent reduction shall be based on the
254      original amount of the building permit fee, unless the parties
255      agree to an extension of time. This paragraph does not apply to
256      permits for any wireless communications facilities.
257              (3)       If any permit fees are refunded under this section,
258      the surcharges provided for in s. 553.721 or s. 468.631 must be
259      recalculated based on the amount of the permit fees after the
260      refund.
261              Section 6.         Paragraph (c) of subsection (5) of section
262      553.794, Florida Statutes, is amended to read:
263              553.794       Local government residential master building
264      permit program.—
265              (5)       MASTER BUILDING PERMIT APPLICATION APPROVAL PROCESS.—
266              (c)       The local building department must approve or deny a
267      master building permit application within 120 days after the
268      local building department receives a completed application,
269      unless the applicant agrees to a longer period. If a local
270      building department fails to approve or deny a master building
271      permit application within 120 days of receiving the completed
272      application, it must reduce the building permit fee by 10
273      percent for each business day the enforcing agency fails to meet
274      the deadline, unless the applicant agrees to a longer time
275      period. Each 10 percent reduction shall be based on the original

                                                      Page 11 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V
F   L    O   R   I   D   A     H   O   U   S   E      O   F      R    E   P   R   E   S   E   N   T   A   T   I   V   E   S




         PCS for HB 1059                                                                                      2021




276      amount of the building permit fee. If any permit fees are
277      refunded, the surcharges provided for in s. 553.721 or s.
278      468.631 must be recalculated based on the amount of the permit
279      fees after the refund.
280              Section 7.         Present subsections (6) through (7) of section
281      713.135, Florida Statutes, are redesignated as subsections (7)
282      through (8), respectively, new subsection (6) is added to that
283      section, to read:
284              713.135       Notice of commencement and applicability of lien.—
285              (6)       An authority that issues building permits may not
286      require an applicant to provide a direct contract or a contract
287      between a contractor and any other lienor as a condition of the
288      application for, or processing or issuance of, a building permit
289      for the construction of improvements or for the alteration or
290      repair of improvements on or to commercial property. This
291      subsection does not apply to the construction of improvements or
292      the alteration or repair of improvements owned or leased by the
293      federal government, the state or any county, city, or political
294      subdivision thereof, or other public authority.
295              Section 8.         This act shall take effect October 1, 2021.




                                                      Page 12 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                                      V


File and source

File
2021_3101_regulatory-reform-subcommittee_proposed-committee-bills-pcbs_fn-pcs-for-hb-1059.pdf
Size
129,619 bytes
SHA-256
25c3bd0a4de77aef981b936187435b9d390fa91d629df3339b1a30289505cd9c
Our copy
2021_3101_regulatory-reform-subcommittee_proposed-committee-bills-pcbs_fn-pcs-for-hb-1059.pdf
Original
No public link identified.
Back to top