Pandemic Darlings The pandemic economy, in original documents
Home Source documents Substitute Senate Bill 5403 - interagency, multijurisdictional system improvement team (2021 Regular Session)

Substitute Senate Bill 5403 - interagency, multijurisdictional system improvement team (2021 Regular Session)

Summary

The text of Substitute Senate Bill 5403, 67th Legislature, 2021 Regular Session, by Senate State Government & Elections, read first time 02/15/21. The bill is an act relating to the interagency, multijurisdictional system improvement team, reenacting and amending RCW 43.155.150 and providing an expiration date. It describes outcomes the team must work toward, representatives of state infrastructure programs that provide funding for drinking water, wastewater, and stormwater programs, and briefings to the public works board. The final subsection provides that the section expires in 2025.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Substitute Senate Bill 5403 - interagency, multijurisdictional system improvement team (2021 Regular Session).” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2021-03-19-a28806-bill-5403-s-9ea222b4a7/, SHA-256 392f6f53d509f99b74de200a54b502f2208de5bf9905a2ade47f9bfedb246762.

Full text

     S-1049.1

                           SUBSTITUTE SENATE BILL 5403


     State of Washington         67th Legislature        2021 Regular Session

     By Senate State Government     & Elections (originally sponsored by
     Senators Wellman, Warnick,     Hasegawa, Kuderer, Lovelett, Mullet,
     Saldaña, and Wilson, C.)

     READ FIRST TIME 02/15/21.




1        AN ACT Relating to the interagency, multijurisdictional system
2    improvement team; reenacting and amending RCW 43.155.150; and
3    providing an expiration date.


4    BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:


 5       Sec. 1.   RCW 43.155.150 and 2017 3rd sp.s. c 10 s 11 are each
 6   reenacted and amended to read as follows:
 7       (1) An interagency, multijurisdictional system improvement team
 8   must identify, implement, and report on system improvements that
 9   achieve the designated outcomes, including:
10       (a) Projects that maximize value, minimize overall costs and
11   disturbance to the community, and ensure long-term durability and
12   resilience;
13       (b) Projects that are designed to meet the unique needs of each
14   community, rather than the needs of particular funding programs;
15       (c) Project designs that maximize long-term value by fully
16   considering and responding to anticipated long-term environmental,
17   technological, economic and population changes;
18       (d) The flexibility to innovate, including utilizing natural
19   systems, addressing multiple regulatory drivers, and forming regional
20   partnerships;


                                       p. 1                          SSB 5403
 1       (e) The ability to plan and collaborate across programs and
 2   jurisdictions so that different investments are packaged to be
 3   complementary, timely, and responsive to economic and community
 4   opportunities;
 5       (f) The needed capacity for communities, appropriate to their
 6   unique financial, planning, and management capacities, so they can
 7   design, finance, and build projects that best meet their long-term
 8   needs and minimize costs;
 9       (g)   Optimal   use   and    leveraging    of   federal  and    private
10   infrastructure dollars; and
11       (h) Mechanisms to ensure periodic, system-wide review and ongoing
12   achievement of the designated outcomes.
13       (2) The system improvement team must consist of representatives
14   of state infrastructure programs that provide funding for drinking
15   water, wastewater, and stormwater programs, including but not limited
16   to representatives from the public works board, department of
17   ecology, department of health, and the department of commerce. The
18   system   improvement   team    may   invite   representatives    of   other
19   infrastructure programs, such as transportation and energy, as needed
20   in order to achieve efficiency, minimize costs, and maximize value
21   across infrastructure programs. The system improvement team shall
22   also consist of representatives of users of those programs,
23   representatives of infrastructure project builders, and other parties
24   the system improvement team determines would contribute to achieving
25   the desired outcomes, including but not limited to representatives
26   from a state association of cities, a state association of counties,
27   a state association of public utility districts, a state association
28   of water and sewer districts, a state association of general
29   contractors, and a state organization representing building trades.
30   The public works board, a representative from the department of
31   ecology, department of health, and department of commerce shall
32   facilitate the work of the system improvement team.
33       (3) The system improvement team must focus on achieving the
34   designated   outcomes    within    existing     program   structures    and
35   authorities. The system improvement team shall use lean practices to
36   achieve the designated outcomes.
37       (4) The system improvement team shall provide briefings as
38   requested to the public works board on the current state of
39   infrastructure    programs    to    build   an    understanding    of   the


                                        p. 2                           SSB 5403
 1   infrastructure investment program landscape and the interplay of its
 2   component parts.
 3       (5) If the system improvement team encounters statutory or
 4   regulatory barriers to system improvements, the system improvement
 5   team must inform the public works board and consult on possible
 6   solutions. When achieving the designated outcomes would be best
 7   served through changes in program structures or authorities, the
 8   system improvement team must report those findings to the public
 9   works board.
10       (6) This section expires June 30, ((2021)) 2025.

                                 --- END ---




                                     p. 3                        SSB 5403


File and source

File
2021-03-19_a28806_bill_5403-s.pdf
Size
64,711 bytes
SHA-256
392f6f53d509f99b74de200a54b502f2208de5bf9905a2ade47f9bfedb246762
Our copy
2021-03-19_a28806_bill_5403-s.pdf
Original
No public link identified.
Back to top