Home Source documents Regulatory Reform Subcommittee, March 2, 2021: HB 911 by Rep. Buchanan, Medical Treatment of Animals

Regulatory Reform Subcommittee, March 2, 2021: HB 911 by Rep. Buchanan, Medical Treatment of Animals

Summary

Meeting packet of the Regulatory Reform Subcommittee for March 2, 2021. It opens with HB 911, Medical Treatment of Animals, by Rep. Buchanan, which amends section 474.202, Florida Statutes, so that a veterinarian/client/patient relationship may be established by telephone or other means without a physical examination, and amends section 828.30 on rabies vaccination. An amendment summary dated March 2, 2021 describes an amendment by Rep. Buchanan defining "veterinary telemedicine" and limiting remote prescribing of controlled substances to inpatient or hospice treatment. A staff analysis dated 2/26/2021 covers PCS for HB 1059, Building Permits, which would require local enforcement agencies to post permit applications online and reduce permit fees when review deadlines are missed, effective October 1, 2021.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Regulatory Reform Subcommittee, March 2, 2021: HB 911 by Rep. Buchanan, Medical Treatment of Animals.” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2021-03-02-3101-regulatory-reform-subcommittee-meeting-packets-fn-rrs-216fd50c71/, SHA-256 785e4d4855eee6f9ded0a1472d9a30c032d8d9c2cda82f705c8a6b1a94eb951c.

Full text

FLORIDA                       H   O    U   S   E     0    F      REPRESENTATIVES




        HB 911                                                                             2021




26               474.202       Definitions.-As used in this chapter:
27               ( 12)     "Veterinarian/ client/patient relationship" means a
28      relationship where the veterinarian has assumed the
29      responsibility for making medical judgments regarding the health
30      of the animal and its need for medical treatment. Such
31      relationship may be established in person, by telephone, or by
32      other means consistent with the individual veterinarian's
33      professional judgment. A physical examination is not required
34      for the veterinarian to assume responsibility for making medical
35      judgments or providing treatment.
36               Section 2.         Paragraph (a) of subsection (5)          of section
37      474.203, Florida Statutes, is amended to read:
38               474.203       Exemptions.-This chapter does not apply to:
39               (5) (a)     Any person, or the person's regular employee,
40      administering to the ills or injuries of her or his own animals,
41      including, but not limited to, castration, spaying, and
42      dehorning of herd animals, unless title is transferred or
43      employment provided for the purpose of circumventing this law.
44      This exemption does not apply to any person licensed as a
45      veterinarian in another state or foreign jurisdiction and
46      practicing temporarily in this state. However, except as
47      provided ins. 828.30, only a veterinarian may immunize or treat
48      an animal for diseases that are communicable to humans and that
49      are of public health significance.
50

                                                       Page 2 of 5

     CODING: Words stricken are deletions; words underlined are additions.
                                                                                          hb0911-00
FLORIDA                       H   O   U   S   E      0     F      REPRESENTATIVES




        HB 911                                                                   2021




51      For the purposes of chapters 465 and 893, persons exempt
52      pursuant to subsection (1), subsection (2), or subsection (4)
53      are deemed to be duly licensed practitioners authorized by the
54      laws of this state to prescribe drugs or medicinal supplies.
55               Section 3.        Paragraph (y) of subsection (1) of section
56      474.214, Florida Statutes, is amended to read:
57               474.214       Disciplinary proceedings.-
58               (1)    The following acts shall constitute grounds for which
59      the disciplinary actions in subsection (2) may be taken:
60               (y)    Using the privilege of ordering, prescribing, or
61      making available medicinal drugs or drugs as defined in chapter
62      465, or controlled substances as defined in chapter 893, for use
63      other than for the specific treatment of animal patients for
64      which there is a documented veterinarian/client/patient
65      relationship. Pursuant thereto, The veterinarian shall:
66               1.    Have sufficient knowledge of the animal to initiate at
67      least a general or preliminary diagnosis of the medical
68      condition of the animal, which means that the veterinarian is
69      personally acquainted with the keeping and caring of the animal
70      and has recently seen the animal or has made medically
71      appropriate and timely visits to the premises where the animal
72      is kept.
73               2.    Be available or provide for followup care and treatment
74      in case of adverse reactions or failure of the regimen of
75      therapy.

                                                         Page 3 of 5

     CODING: Words striokon are deletions; words underlined are additions.
                                                                                hb0911-00
FLORIDA                        H   O   U   S   E      0     F      REPRESENTATIVES




         HB 911                                                                                 2021




 76               3.     Maintain records which document patient visits,
 77      diagnosis, treatment, and other relevant information required
 78      under this chapter.
 79               Section 4.        Subsections (1) and (3) of section 828.30,
 80      Florida Statutes, are amended to read:
 81               828.30      Rabies vaccination of dogs, cats, and ferrets.-
 82               ( 1) (a)    Except as provided in paragraph (b), all dogs,
 83      cats, and ferrets 4 months of age or older must be vaccinated by
 84      a licensed veterinarian against rabies with a vaccine that is
 85      licensed by the United States Department of Agriculture for use
 86      in those species~
 87               (b)    An employee, agent, or contractor of an animal control
 88      authority acting under the indirect supervision of a
 89      veterinarian may vaccinate impounded animals that will be
 90      transferred,         rescued, fostered,                adopted, or reclaimed by the
 91      owner. As used in this subsection, the term "indirect
 92      supervision," means that the supervising veterinarian is
 93      available for consultation by telecommunications but is not
 94      required to be on the premises during such consultation. The
 95      supervising veterinarian assumes responsibility for the
 96      veterinary care given to the animal by any person working under
 97      or at his or her direction and supervision.
 98               J.£1    The owner of every dog, cat, and ferret shall have the
 99      animal revaccinated 12 months after the initial vaccination.
100      Thereafter, the interval between vaccinations shall conform to

                                                          Page 4 of 5

      CODING: Words striskeA are deletions; words underlined are additions.
                                                                                               hb0911-00
FLORIDA                        H   O   U   S   E      0   F      REPRESENTATIVES




         HB 911                                                                 2021




101      the vaccine manufacturer's directions. The cost of vaccination
102      must be borne by the animal's owner. Evidence of circulating
103      rabies virus neutralizing antibodies may shall not be used as a
104      substitute for current vaccination in managing rabies exposure
105      or determining the need for booster vaccinations.
106               (3)    Upon vaccination against rabies, the licensed
107      veterinarian shall provide the animal's owner and the animal
108      control authority with a rabies vaccination certificate. Each
109      animal control authority and veterinarian shall use the "Rabies
110      Vaccination Certificate" of the National Association of State
111      Public Health Veterinarians (NASPHV) or an equivalent form
112      approved by the local government that contains all the
113      information required by the NASPHV Rabies Vaccination
114      Certificate. The veterinarian who administers the rabies
115      vaccination, or who supervises an employee, agent, or contractor
116      of an animal control authority administering the rabies
117      vaccination, vaccine to an animal as required under this section
118      may affix his or her signature stamp in lieu of an actual
119      signature.
120               Section 5.        This act shall take effect July 1, 2021.




                                                       Page 5 of 5

      CODING: Words stricken are deletions; words underlined are additions.
                                                                               hb0911-00
                        REGULATORY REFORM SUBCOMMITTEE

                                HB 911 by Rep. Buchanan
                               Medical Treatment of Animals

                                  AMENDMENT SUMMARY
                                      March 2, 2021


Amendment 1 by Rep. Buchanan (line 35):
The amendment:
   • Defines "veterinary telemedicine" as "the practice of veterinary medicine in a remote
      setting, including through the use of telephone or audio-visual technology or by other
      means consistent with the veterinarian's professional judgment."
   • Authorizes veterinarians to establish a veterinarian/client/patient relationship in person,
      or by means of veterinary telemedicine.
   • Specifies that a physical examination is not required for the veterinarian to assume
      responsibility for making medical decisions or providing treatment.
   • Prohibits veterinarians from prescribing controlled substances if the
      veterinarian/client/patient relationship has been established remotely and a physical
      examination has not previously occurred, unless the controlled substance is prescribed
      for the following:
           o Inpatient treatment at an animal clinic or hospital; or
           o The treatment of a patient receiving hospice services.
   • Requires veterinarians to hold a current license to practice veterinary medicine in the
      State of Florida in order to practice veterinary telemedicine in Florida.
   • Grants the Florida Board of Veterinary Medicine jurisdiction over a veterinarian
      practicing veterinary telemedicine in Florida, regardless of where the veterinarian's
      physical offices are located.
   • Specifies that the practice of veterinary is not a violation of the standard of care, and a
      veterinarian may not be disciplined for practicing veterinary telemedicine.
                                              COMMITTEE/SUBCOMMITTEE AMENDMENT
                                                       Bill No. HB 911   (2021)
       Amendment No. 1




               COMMITTEE/SUBCOMMITTEE ACTION
       ADOPTED                        (Y/N)
       ADOPTED AS AMENDED             (Y/N)
       ADOPTED W/0 OBJECTION          (Y/N)
       FAILED TO ADOPT                (Y/N)
       WITHDRAWN                      (Y/N)
       OTHER


 1     Committee/Subcommittee hearing bill:       Regulatory Reform
 2     Subcommittee
 3     Representative Buchanan offered the following:
 4
 5          Amendment (with directory and title amendments)
 6          Remove lines 31-35 and insert:
 7     relationship may be established in person, or by means of
 8     veterinary telemedicine if audio-visual technology is used to
 9     establish such relationship. A physical examination is not
10     required for the veterinarian to assume responsibility for
11     making medical judgments or providing treatment.
12             (14) nveterinary telemedicine" means the practice of
13     veterinary medicine in a remote setting, including through the
14     use of telephone or audio-visual technology or by other means
15     consistent with the veterinarian's professional judgment, as


     337143 - hb0911-Line31.docx
     Published On: 3/1/2021 2:50:26 PM
                                    Page 1 of 3
                                           COMMITTEE/SUBCOMMITTEE AMENDMENT
                                                     Bill No. HB 911   (2021)
       Amendment No. 1



16     long as the veterinarian/client/patient relationship is
17     established either in person or by audio-visual technology.
18          Section 2.     Section 474.2031, Florida Statutes, is created
19     to read:
20          474.2021     Veterinary Telemedicine.-
21          (1)   A veterinarian may practice veterinary telemedicine.
22          (2)   A veterinarian may not prescribe controlled substances
23     if the veterinarian/client/patient relationship has been
24     established remotely under this section and a physical
25     examination has not previously occurred, unless the controlled
26     substance is prescribed for the following:
27          (a) Inpatient treatment at an animal clinic or hospital; or
28          (b) The treatment of a patient receiving hospice services.
29          (3) A veterinarian must hold a current license to practice
30     veterinary medicine in the State of Florida in o rder to practice
31     veterinary telemedicine in Florida.
32          (4) The Board has jurisdiction over a veterinarian
33     practicing veterinary telemedicine in Florida, regardless of
34     where the veterinarian's physical offices are located. However,
35     the practice of veterinary telemedicine in conformance with this
36     chapter is not a violation of the standard of care, and a
37     veterinarian may not be disciplined solely for practicing
38     veterinary telemedicine.
39
40
     337143 - hb0911-Line31.docx
      Published On: 3/1/2021 2:50:26 PM
                                     Page 2 of 3
                                          COMMITTEE/SUBCOMMITTEE AMENDMENT
                                                   Bill No. HB 911   (2021)
       Amendment No. 1



41                   D I R E C T O R Y    A ME N D ME N T
42          Remove lines 24-25 and insert:
43          Section 1.   Section 474.202, Florida Statutes, is amended
44     to read:
45
46
47                        T I T L E   A ME N D ME N T
48          Remove line 7 and insert:
49     diseases; defining "veterinary telemedicine"; creating s.
50     474.2031, F.S.; authorizing veterinarians to establish
51     veterinarian/client/patient relationship remotely; prohibiting
52     veterinarians from prescribing controlled substances under
53     certain circumstances; authorizing the Florida Board of
54     Veterinary Medicine jurisdiction; specifying standard of care
55     and discipline; amending s. 474.214, F.S.; revising grounds




     337143 - hb0911-Line31.docx
      Published On: 3/1/2021 2:50:26 PM
                                   Page 3 of 3
I
OJ
,_I,.

0
O'I
<.D
                                     HOUSE OF REPRESENTATIVES STAFF ANALYSIS
BILL #:     PCS for HB 1059 Building Permits
SPONSOR(S): Regulatory Reform Subcommittee
TIED BILLS:       IDEN./SIM. BILLS:

     REFERENCE                                                       ACTION                    ANALYST            STAFF DIRECTOR or
                                                                                                                  BUDGET/POLICY CHIEF

     Orig. Comm.: Regulatory Reform Subcommittee                                                                  Anstead


                                                         SUMMARY ANALYSIS
The Florida Building Codes Act provides a mechanism for the uniform adoption, updating, interpretation, and
enforcement of a single, unified state building code. The Florida Building Code must be applied, administered,
and enforced uniformly and consistently from jurisdiction to jurisdiction.

Current law requires local governments to enforce the Building Code and issue building permits. Current law
also requires state agencies, state universities, Florida College System institutions, and public school districts
to enforce the Building Code in certain situations. Each local government entity may provide a schedule of
reasonable fees in order to defer the costs of inspection and enforcement of the Building Code. It is unlawful to
construct, erect, alter, repair, secure, or demolish any building without first obtaining a building permit.

A development permit is any official action of a local government that has the effect of permitting the
development of land including, but not limited to, building permits, zoning permits, subdivision approval,
rezoning, certifications, special exceptions, and variances. A development order is issued by a local
government and grants, denies, or grants with conditions an application for a development permit.

The bill:
   • Requires local governments to review additional information for an application for a development permit
        or development order within a certain time-period.
   • Clarifies and requires local enforcement agencies to:
            o post each building permit application, including a list of any required attachments, such as
                drawings or plans, on their websites;
            o allow applicants to submit completed building permit applications electronically including any
                required payments and attachments, such as plans;
            o post the current status of every received building permit application on their website; and
            o post their procedures for reviewing, processing, and approving building permit applications on
               their websites.
   • Requires government entities, which enforce the Building Code, that fail to meet current established
        deadlines for reviewing building permit applications to reduce the fee for such permits for every
        business day that they miss the deadline, unless the applicant agrees to a longer period.
   • Requires government entities that deny a building permit application for a single-family residential
        dwelling to allow the applicant 10 business days to correct the application.
   • Prohibits government entities from requiring a copy of a contractor's contract with owners,
        subcontractors, or suppliers in order to obtain a building permit for projects on commercial property.
            o This does not apply to projects for improvements owned or leased by a government entity.

The bill may have an indeterminate fiscal impact on state and local government. See Fiscal Comments.

The bill provides for an effective date of October 1, 2021 .




This document does not reflect the intent or official position of the bill sponsor or House of Representatives.
STORAGE NAME: pcs1059.RRS.D0CX
DATE: 2/26/2021
                                                       FULL ANALYSIS

                                                 I. SUBSTANTIVE ANALYSIS

         A. EFFECT OF PROPOSED CHANGES:
           The Community Planning Act

           Adopted in 1985, the Local Government Comprehensive Planning and Land Development Regulation
           Act, 1 also known as Florida's Growth Management Act, was significantly revised in 2011, becoming the
           Community Planning Act. 2 The Community Planning Act governs how local governments create and
           adopt their local comprehensive plans.

           Local comprehensive plans must include principles, guidelines, standards, and strategies for the orderly
           and balanced future land development of the area and reflect community commitments to implement
           the plan. The intent of the Act is that local governments manage growth through comprehensive land
           use plans that facilitate adequate and efficient provision of transportation, water, sewage, schools,
           parks, recreational facilities, housing, and other requirements and services. 3 A housing element is
           required as part of every comprehensive plan in the state. Among other things, the housing element
           must address "the creation or preservation of affordable housing to minimize the need for additional
           local services and avoid the concentration of affordable housing units only in specific areas of the
           jurisdiction." 4

           Municipalities established after the effective date of the Community Planning Act must adopt a
           comprehensive plan within three years after the date of incorporation. 5 The county comprehensive plan
           controls until a municipal comprehensive plan is adopted. 6

           The comprehensive plan is implemented via land development regulations. Each county and
           municipality must adopt and enforce land development regulations, such as zoning or other housing-
           related ordinances, that are consistent with and implement their adopted comprehensive plan. 7

           Issuing Development Orders and Permits - Current Situation

           Under the Community Planning Act, a development permit is any official action of a local government
           that has the effect of permitting the development of land including, but not limited to, building permits,
           zoning permits, subdivision approval, rezoning, certifications, special exceptions, and variances. 8 A
           development order is issued by a local government and grants, denies, or grants with conditions an
           application for a development permit. 9

           When reviewing an application for a development permit or development order, not including building
           permit applications, a county or municipality may not request additional information from the applicant
           more than three times, unless the applicant waives the limitation in writing. 10

           Before a third request for information, the applicant must be offered a meeting to attempt to resolve
           outstanding issues. 11 If the applicant believes the request for additional information is not authorized by
           ordinance, rule, statute, or other legal authority, the applicant can request the county or municipality

1 See ch. 85-55, s. 1, Laws of Fla.
2 See ch. 2011-139, s. 17, Laws of Fla.
3
    S. 163.3161(4), F.S.
4 S. 163.3177(6)(f)1.g., F.S.
5 S. 163.3167(3), F.S.

6 fd.
7 S. 163.3202, F.S.
8 S. 163.3164(16), F.S.
9
    See ss. 125.022, 163.3164(15), and 166.033, F.S.
10 Ss. 125.022(1) and 166.033(1), F.S.
11 Id.
STORAGE NAME: pcs1059.RRS.DOCX                                                                                   PAGE: 2
DATE: 2/26/2021
         proceed to process the application for approval or denial. 12 If denied, the county or municipality is
         required to give written notice to the applicant and must provide reference to the applicable legal
         authority for the denial of the permit. 13

         Prior to 2019, there was no specified timeframes provided in current statute for reviewing an application
         for a development permit, development order, or additional information requested by a county or
         municipality. 14

         In 2019, the Legislature imposed requirements and time limits for a county or municipality to review an
         application for a development permit or development order, not including building permit applications,
         and provided procedures for addressing deficiencies in an application. 15

         Within 30 days of receiving an application for a development permit or development order, a county or
         municipality must review the application and issue a letter to the applicant indicating that the application
         is complete or specify the deficiencies within 30 days after receiving the application. 16 If the county or
         municipality identifies deficiencies, the applicant has 30 days to submit the required additional
         information. 17

         Once an application is deemed complete, a county or municipality must approve, approve with
         conditions, or deny the application within 120 days or 180 days for applications that require final action
         through a quasi-judicial hearing or a public hearing. 18

         Current law specifies how long an applicant has to submit additional information to a local government.
         However, current law does not specify how long a local government has to review the additional
         information and determine if the application is complete or still deficient.

         Issuing Development Orders and Permits - Effect of the Bill

         The bill provides that if a county or municipality makes a request for additional information from the
         applicant and the applicant provides the information within 30 days of receiving the request, the county
         or municipality must:

             •   Review the additional information and issue a letter to the applicant indicating that the
                 application is complete or specify the remaining deficiencies within 30 days of receiving the
                 information, if the request is the county or municipality's first request.
             •   Review the additional information and issue a letter to the applicant indicating that the
                 application is complete or specify the remaining deficiencies within 10 days of receiving the
                 information, if the request is the county or municipality's second request.
             •   Deem the application complete within 10 days of receiving the information or proceed to
                 process the application for approval or denial unless the applicant waived the county or
                 municipality's time limitations in writing, if the request is the county or municipality's third
                 request.

         The Florida Building Code

         In 1974, Florida adopted legislation requiring all local governments to adopt and enforce a minimum
         building code that would ensure that Florida's minimum standards were met. Local governments could
         choose from four separate model codes. The state's role was limited to adopting all or relevant parts of

12 Jd.
13
   Ss. 125.022(2) and 166.033(2), F.S.
14
   Ss. 125.022(1) and 166.033(1), F.S. (2018).
15
   See House Analysis of2019 House Bill 7103 (Jul. 1, 2019).
16
   Ss. 125.022(1) and (2), and 166.033 (1) and (2), F.S.
11 Id.

1s Id.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                 PAGE: 3
DATE: 2/26/2021
         new editions of the four model codes. Local governments could amend and enforce their local codes,
         as they desired. 19

         In 1992, Hurricane Andrew demonstrated that Florida's system of local codes did not work. Hurricane
         Andrew easily destroyed those structures that were allegedly built according to the strongest code. The
         Governor eventually appointed a study commission to review the system of local codes and make
         recommendations for modernizing the system. The 1998 Legislature adopted the study commission's
         recommendations for a single state building code and enhanced the oversight role of the state over
         local code enforcement. The 2000 Legislature authorized implementation of the Florida Building Code
         (Building Code), and that first edition replaced all local codes on March 1, 2002. 20 The current edition of
         the Building Code is the seventh edition, which is referred to as the 2020 Florida Building Code. 21

         Part IV of ch. 553, F.S., is known as the "Florida Building Codes Act" (Act). The purpose and intent of
         the Act is to provide a mechanism for the uniform adoption, updating, interpretation, and enforcement
         of a single, unified state building code. The Building Code must be applied, administered, and enforced
         uniformly and consistently from jurisdiction to jurisdiction. 22

         The Florida Building Commission (Commission) was statutorily created to implement the Building
         Code. The Commission, which is housed within the Department of Business and Professional
         Regulation (DBPR), is a 19-member technical body made up of design professionals, contractors, and
         government experts in various disciplines covered by the Building Code. The Commission reviews
         several International Codes published by the International Code Council, 23 the National Electric Code,
         and other nationally adopted model codes to determine if the Building Code needs to be updated and
         adopts an updated Building Code every three years. 24

         Enforcement of the Florida Building Code

         It is the intent of the Legislature that local governments have the power to inspect all buildings,
         structures, and facilities within their jurisdiction in protection of the public's health, safety, and welfare. 25
         Every local government must enforce the Florida Building Code and issue building permits. 26

         State universities, Florida College System institutions, and public school districts enforce the Building
         Code for their building projects, including conducting plan review and inspections. State universities,
         Florida College System institutions, and public school districts must use or contract with licensed
         building officials, inspectors, and plan examiners, and may elect to use a local government's building
         department to review plans and perform inspections. 27

         Current law also provides that state agencies may enforce the Building Code if current law specifically
         authorizes them to do so, unless they have delegated responsibility to another public entity. 28 Current
         law provides that: 29



19
   The Florida Building Commission Report to the 2006 Legislature, Florida Department of Community Affairs, p. 4,
http://www.floridabuilding.org/tbc/publications/2006 Legislature Rot rev2.pdf (last visited Feb. 15, 2021).
20
   Id; DBPR, Building Code Information System, https://floridabuilding.org/c/default.aspx# (last visited on Feb. 15, 2021).
21
   Florida Building Commission Homepage, https://tloridabuilding.org/c/defauJt.aspx (last visited Mar. 14, 2019).
22
   See S. 553.72(1), F.S.
23
   The International Code Council (ICC) is an association that develops model codes and standards used in the design, building, and
compliance process to "construct safe, sustainable, affordable and resilient structures." International Code Council, About the ICC,
https://www.iccsafe.org/about/who-we-are/ (last visited Feb. 21, 2021).
24
   Ss. 553.73, & 553.74, F.S.
25
   S. 553.72, F.S.
26
   Ss. 125.0l(l)(bb), 125.56(1), & 553.80(1), F.S.
27
   S. 553.80(6), F.S.
28
   Ss. 255.31(1), and 553.80(1), F.S.
29 Id.
STORAGE NAME: pcs1059.RRS.DOCX                                                                                                 PAGE: 4
DATE: 2/26/2021
              •   The Department of Corrections and the Department of Juvenile Justice, and the Department of
                  Management Services (OMS) enforces the construction regulations relating to correctional
                  facilities under their jurisdiction.
              •   The OMS enforces the construction regulations for the Governor's Mansion and its grounds, the
                  Capitol, and the Capitol complex.
              •   The DBPR enforces the construction regulations relating to elevator equipment under their
                  jurisdiction.
              •   The Turnpike Enterprise, which is part of the Department of Transportation, enforces the
                  construction regulations for toll collection facilities under its jurisdiction.
              •   The Department of Children and Families (DCF) in conjunction with the Agency for Health Care
                  Administration (ACHA) enforces construction regulations relating to secure mental health
                  treatment facilities under DC F's jurisdiction.
              •   The AHCA also reviews plans and surveys construction of hospitals, nursing homes,
                  ambulatory surgical centers, and Intermediate Care Facilities for the Developmentally Disabled.

         It is unlawful for a person, firm, or corporation to construct, erect, alter, repair, secure, or demolish any
         building without first obtaining a building permit from the local government or from such persons as
         may, by resolution or regulation, be directed to issue such permit, upon the payment of reasonable fees
         as set forth in a schedule of fees adopted by the enforcing agency. 30 A building permit is not valid until
         the fees for the permit have been paid. 31

         A building permit is an official document or certificate issued by the local building official that authorizes
         performance of a specific activity. 32 A building official is a local government employee or a person
         contracted by a government entity who supervises building code activities, including plans review,
         enforcement, and inspection. 33 Any construction work that requires a building permit also requires plans
         and inspections by the building official to ensure the work complies with the Building Code. 34

         Each government entity may provide a schedule of reasonable fees in order to defer the costs of
         inspection and enforcement of the Building Code. The basis for a local government's fee structure must
         relate to the level of service provided by the local government. Fees charged must be consistently
         applied. Each local government must post its permit and inspection fee schedule and a utilization
         report 35 on its website. 36

         A local government's permit and inspection fees must be used solely for carrying out that local
         government's responsibilities in enforcing the Building Code. This includes: 37

              •   the direct costs and reasonable indirect costs associated with review of building plans, building
                  inspections, reinspections, and building permit processing;
              •   building code enforcement;
              •   fire inspections associated with new construction; and
              •   training costs associated with the enforcement of the Building Code and enforcement action
                  pertaining to unlicensed contractor activity to the extent not funded by other user fees.




30
   See Ss. 125.56(4)(a) & 553.79(1), F.S.
31
   S. 109.1 of the Seventh edition of the Florida Building Code (Building).
32
   S. 468.603(2), F.S; S. 202 of the Seventh edition of the Florida Building Code (Building).
33
   S. 468.603(2), F.S.; S. 202 of the Seventh edition of the Florida Building Code (Building).
34
   Ss. 107, 110.1, and 110.3 of the Seventh edition of the Florida Building (Building).
35
   The utilization report must include the local government's direct and indirect costs for enforcing the Building. S. 553.80(7), F.S.
36
   Ss. 125.56(2) and (4), 166.222, and 553.80(7), F.S.
37
   S. 553.80(7), F.S.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                                    PAGE: 5
DATE: 2/26/2021
         DBPR Surcharges

         Current law requires all local governments to assess and collect a 1% surcharge on any building permit
         issued by their enforcement agency for the purpose of enforcing the Building Code. The local
         jurisdictions collect the assessment and remit the surcharge fees to DBPR to fund the activities of the
         Florida Building Commission, DBPR's Building Code Compliance and Mitigation Program, and the
         Florida Fire Prevention Code informal interpretations. 38

         Current law also requires all local governments to assess and collect a separate 1.5% surcharge on
         any building permit issued by their enforcement agency for the purpose of enforcing the Building Code.
         The local governments collect the assessment and remit the surcharge fees to DBPR, where it is
         divided equally to fund the activities of the BCAIB and the Florida Homeowners' Construction Recovery
         Fund. 39

         Local government building departments are permitted to retain 10% of the amount of the surcharges
         they collect to fund participation by their agencies in the national and state building code adoption
         processes and to provide education related to enforcement of the Florida Building Code. 40

         Building Permit Delays

         Any delays in obtaining a building permit can delay the completion of a construction. Delays in the
         completion of a construction project may: 41

             •    Lead to increased costs for construction projects, which may be passed onto occupants of a
                  completed project;
             •    Discourage construction, which can reduce the total supply of buildings in a community and
                  may lead to higher rents in the community;
             •    Reduce property tax revenue to a local government and other taxing jurisdictions resulting from
                  the delayed start and completion of a construction project; and
             •    Result in delayed occupancy of a project, including single-family residences and multi-family
                  residences.

         Streamlining the process to obtain a building permit can accelerate the completion of construction
         projects. The goal of streamlining is to remove overlap and duplication and create more efficient
         administrative procedures while not reducing a building department's ability to enforce the applicable
         construction codes. Streamlining the building permit process may: 42

             •    Increase local government revenues by accelerating completion of a project and thus
                  accelerating property tax collection;
             •    Create local construction jobs and other indirect jobs supported by local construction jobs, such
                  as jobs at a material supplier, which may increase local tax revenue by creating local
                  construction jobs and other indirect jobs; and

38
   S. 553.721, F.S.
39
   S. 468.631, F.S.; The Florida Homeowners' Construction Recovery Fund is used to compensate homeowners who have suffered a
covered financial loss at the hands of state-licensed general, building and residential contractors. Claims are filed with the DBPR, who
reviews for completeness and statutory eligibility. The DBPR then presents the claim to the Construction Industry Licensing Board for
review. S. 489.1401(2), F.S.
40
   Ss. 468.631, and 553.721, F.S.
41
   City of Austin Development Services Department, A Program for Expedited Permitting,
http://austintexas.gov/sites/default/files/files/8-9-20 l 6 Report on Expedited Permitting Program.pdf (last visited Feb. 22, 2021 );
PricewaterhouseCoopers, The Economic Impact ofAccelerating Permit Processes on Local Development and Government Revenues,
(Dec. 7, 2005).
42
   Id.; Institute for Market Transformation, Streamlining Compliance Processes, (Winter 2012) https:l/www.imt.org/wp-
content/uploads/2018/02/CaseStudy5.pdf (last visited Feb. 24, 2021 ).
STORAGE NAME: pcs1059.RRS.D0CX                                                                                                  PAGE: 6
DATE: 2/26/2021
              •   Encourage economic development by having an efficient permit system.

         List of Required Items for Applications and Electronic Submission of Applications - Current
         Situation

         A local enforcement agency is an agency of local government, a local school board, a community
         college board of trustees, or a university board of trustees in the State University System with
         jurisdiction to make inspections of buildings and to enforce the Building Code.43

         Current law requires local enforcement agencies to post each type of building permit on their website. 44
         Current law also requires local enforcement agencies to allow applicants to submit applications
         electronically, except owners who are acting as contractor under the owner-builder exemption. 45
         Accepted methods of electronic submission include, but are not limited to: 46

              •   E-mail submission of applications in PDF format;
              •   Submission of applications through an electronic fill-in form available on the building
                  department's website; or
              •   Through a third-party submission management software.

         However, it is not clear if current law requires local enforcement agencies to:

             •    post a list or identify other items required as part of the application for each type of building
                  permit on their websites;
             •    allow applicants to electronically submit items required as part of a building permit application
                  including payments, attachments, or drawings; or
             •    post the status of building permit applications on their websites.

         Some local governments list the items required as part of an application, allow applicants to
         electronically submit items required as part of an application, and post the status of building permit
         applications on their websites, while others do not. 47

         Proponents argue that posting a list containing all the required information for each type of building
         permit and the status of every received application saves time by reducing phone calls and emails to
         building department staff. It also reduces the number of applications that are denied due to
         misunderstanding about what materials and information must be provided. 48

         Proponents argue that allowing applicants to submit applications electronically, including all required
         items, saves time and money for builders and developers by shortening the turn-around time for




43
   S. 553.71(5), F.S.
44
   Ss. 125.56(4)(b) & 553.79(l)(b), F.S.
45
   Current law requires property owners who are acting as a contractor under the owner-builder exemption to personally appear at a
local enforcement agency to sign the building permit. Ss. 489.103(7), & 489.503(7), F.S.
46
   Ss. 125.56(4)(b) & 553.79(l)(b), F.S.
47
   City of Miramar, Building, Permits & Inspections, https://www.miramarfl.gov/l 50/Bui ldi ng-Permits-Inspections (last visited Feb.
25, 2021 ); City of Orlando, Permits & Inspections, https://www.orlando.gov/Building-Development/Perrn its-Inspections (last visited
Feb. 24, 2021); Union County, Building Department, https://unioncounty-tlgov/building-department/ (last visited Feb. 25, 2021); City
of Crestview, Building Permits & Inspections, http://www.cityofcrestview.org/ 16 1/Building-Permits-lnspections (last visited Feb. 25,
2021).
48
   Ryan Meres, Seven Keys to Alleviating Permitting Pain, Builder (Jul. 23, 2015) https://www.bui lderonline.com/bu ilding/regulation-
policy/seven-keys-to-alleviating-permitting-pain o (last visited Feb. 24, 2021 ); E-Gov Link, How to Streamline your Local
Government Permitting Process, (Aug. 28, 2019) https://www2.egovli nk .coni/ how-to-streamline-your-local-govemment-permitting-
process/ (last visited Feb. 24, 2021)
STORAGE NAME: pcs1059.RRS.DOCX                                                                                                PAGE: 7
DATE: 2/26/2021
         processing most building permits, and by preventing them from having to travel to and from a building
         department during business hours to drop off the required items. 49

         They also argue that it helps building departments by reducing the cost of printing documents,
         eliminating archiving costs, easing the burden of managing paper documents, and consolidates the
         plan review process by having documents stored on a network server that is available to multiple
         departments and employees. 50

         Building Departments note that the cost to post the list of required items and the status of received
         building permit applications, and the cost to transition from paper documents to electronic documents is
         expensive and it is not easy or quick. 51 Additionally a building department may have to devote limited
         resources to updating the list of required items and the status of received building permit applications. 52

         List of Items Required for Applications and Electronic Submission of Applications - Effect of
         the Bill

         The bill clarifies that local enforcement agencies must:

             •   post each type of building permit application on their website, including a list of all required
                 attachments, drawings, and any other requirements that are required for each type of
                 application.
             •   post the status of received building permit applications online, and update the status.
                     o A local enforcement agency does not have to post the status of a received building
                         permit application if it has issued a permit for the application.
             •   allow building permit applicants to electronically submit applications, including all attachments,
                 payments, drawings, and any other requirements that are required as part of the application.
                     o Applications, including attachments, payments, drawings, and any other requirements or
                         parts that are required as part of the application, may also be submitted in person at the
                         discretion of the building official.

         Process for Reviewing Building Permits - Current Situation

        Current law requires local enforcement agencies to enforce the Building Code and issue building
        permits. However, current law does not specify how local enforcement agencies must review and
        process building applications. Instead, current law leaves it up to local enforcement agencies to
        determine how they want to process, receive, and approve building permit applications.

        According to testimony offered during the regular meeting of the Florida House of Representatives
        Regulatory Reform Subcommittee, there are generally two different models for how building
        departments are setup. One model is the separated review process, which is a process where an
        application goes to different departments for review such as the zoning department and the building
        department. The second model is a combined review process, which operates as a one-stop shop for
        all development review approval. 53 However, local enforcement agencies operate differently from each


49 Building Officials Association of Florida, Florida Engineering Society, AIA Florida, Building Department Guide to Creating and

Processing Electronic Construction Documents,
http://www.aiafla.org/upload documents/BuildingDepartmentGuidetoCreatingandProcessingE\ectronicDocuments.pdf(last visited
Feb. 25, 2021 ); See The Florida Channel, 1/27/2021 House Regulatory Reform Subcommittee, hltps://thefloridachannel.org/videos/ 1-
27-21-house-regulatory-reform-subcommittee/ (last visited Feb. 19, 2021).
50 Id.
51
   Id.; The Community Development Director for the City of Auburndale testified that the cost for them to purchase the software
necessary for the switch to electronic documents cost $90,000. See The Florida Channel, supra note 49.
52 The Massachusetts Association of Regional Planning Agencies, A Best Practices for Streamlined Local Permitting, (Nov. 30, 2007),

http://www.pypc.org/sites/default/ftles/BEST%20PRACTICES%20GUIDE O.pdf (last visited Feb. 24, 2021).
53
   See The Florida Channel, supra note 49.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                              PAGE: 8
DATE: 2/26/2021
            other, and there is no uniform system for processing, receiving, or approving building permit
            applications. 54

            Proponents argue that requiring building departments to list their procedures for receiving, processing,
            and approving building permit applications on their website helps developers and residents by letting
            them know the permitting process from the beginning. It also reduces conflicts and delays in application
            review due to misunderstanding about a building department's procedures. It also helps new staff by
            letting them know what their responsibilities are in the process. 55

            Building departments note that, a building department may have to devote limited resources to creating
            the list of its procedures for receiving, processing, and approving building permit applications on its
            website. Additional resources may also be needed to update the list to ensure the listed procedures are
            current and up to date. 56

            Process for Reviewing Building Permits - Effect of the Bill

            The bill requires local enforcement agencies to post their procedures for processing, reviewing, and
            approving submitted building permit applications on their websites.

            Time-Period to Review Building Permit Applications - Current Situation

           Current law requires local governments to review certain building permit applications within a specific
           time-period of receiving the applications. Current law has established time-periods for local
           governments to review applications for the following building permits: 57

                •   accessory structure;
                •   alarm permit;
                •   nonresidential buildings less than 25,000 square feet;
                •   electric;
                •   irrigation permit;
                •   landscaping;
                •   mechanical;
                •   plumbing;
                •   residential units other than a single family unit;
                •   multifamily residential not exceeding 50 units;
                •   roofing;
                •   signs;
                •   site-plan approvals and subdivision plats not requiring public hearings or public notice;
                •   lot grading and site alteration associated with the permit application set forth in this subsection;
                •   master building permits; and
                •   single-family residential buildings.

           When a local government receives an application for one of the above building permits, except master
           building permits and single-family residential buildings, it must: 58

                •   Inform the applicant within 10 days of receiving the application, what information, if any, is
                    needed to complete the application.



54 Id.
55
     The Massachusetts Association of Regional Planning Agencies supra note 52.
56 Id.
57
     S. 553.792(2), F.S.
58
     S. 553.792(1), F.S.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                       PAGE: 9
DATE: 2/26/2021
                      o   If the local government fails to provide written notice to the applicant within the 10-day
                          window, the application is deemed to be properly completed.
             •    Notify the applicant within 45 days of the application being deemed complete, if additional
                  information is necessary to determine the sufficiency of the application;
                      o If additional information is needed the local government must specify what additional
                          information is necessary.
                      o The applicant may submit the additional information to the local government or request
                          that the local government act on the application without the additional information.
             •    Approve, approve with conditions, or deny the application within 120 days following receipt of
                  the completed application.
                      o This period is tolled during the time an applicant is responding to a request for additional
                          information and may be extended by mutual consent of the parties.

         These time-periods do not apply when a law, agency rule, or local ordinance specify different
         timeframes for review of local building permit applications, for permits for wireless communication
         facilities, or when both parties agree to an extension. 59

         If a local government receives a complete master building permit application, it must approve or deny
         the application within 120 days of receiving the completed application, unless the applicant agrees to a
         longer period. 60

         If any government entity with authority to enforce the Building Code receives an application for a
         building permit for single-family residential dwelling, it must issue the permit within 30 business days of
         receiving the application, unless the application fails to satisfy the Building Code or the enforcing
         agency's laws or ordinances, or unusual circumstances require a longer time-period for processing the
         application. 61

         Current law provides time-periods for when government entities must review certain building permit
         applications. However, current law does not provide any penalty if a government entity fails to comply
         with the deadlines established by current law.

         Time-Period to Review Building Permit Applications - Effect of the Bill

         The bill requires local governments to reduce a permit fee for building permit applications by 10 percent
         of the original permit fee for each business day that a local government fails to meet the current
         statutory time-period for reviewing a building permit application or a time-period established by the local
         government.
             • A local government does not have reduce the permit fee if the local government and applicant
                 agree to an extension of time, or if the application is for a master building permit and the
                 applicant agrees to an extension.                                 ·

         The bill provides that if a government entity with authority to enforce the Building Code fails to approve
         an application for a single-family residential dwelling building permit within 30 business days of
         receiving the application, it must reduce the building permit fee by 10 percent of the original permit fee
         for each business day that the enforcing agency fails to meet the deadline.

         A government entity does not have to reduce the fee for a single-family residential dwelling building
         permit, if:


59 Id.
60
   S. 553.794(5)(c), F.S. A master building permit is intended for builders who expect to construct identical single- or two- family
dwellings or townhomes. Once a builder obtains a master building permit, he or she is not required to obtain a new permit for single-
two-family dwelling or townhome as long as the dwelling or townhome is built to the specifications in the master building permit. See
553.794, F.S.
61
   S. 553.79(14), F.S.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                              PAGE: 10
DATE: 2/26/2021
                •    it provides written notice to the applicant, by email or USPS mail within 30 business days of
                     receiving the application; and
                •    The written notice specifically states how the application fails to satisfy the Building Code, or the
                     government entity's laws or ordinances.

            An applicant has 10 business days to address the reasons specified in the government entity's notice. If
            the applicant submits revisions to the government entity within 10 business days of receiving the notice,
            the government entity must approve or deny the permit within 10 business days of receiving the
            applicant's revisions.

            If a government entity fails to approve or deny the permit within 10 business days of receiving the
            applicant's revisions, it must:

                •    reduce the permit fee by 20 percent of the original permit fee for the first day that it fails to meet
                     the deadline; and
                •    an additional 10 percent of the original permit fee for each business day that it fails to meet the
                     deadline, for up to five business days.

           A government entity does not have to reduce the permit fee if the applicant agrees to a longer period in
           writing.

            If any permit fees are refunded because a local government fails to meet an established deadline for
            reviewing a building permit application, the DBPR surcharges for funding the Building Commission, the
            BCAIB, and the Florida Homeowners' Recovery Fund must be recalculated based on the amount of the
            permit fees after the refund.

            Required Information in Building Permit Application - Current Situation

            To obtain a permit, an applicant must complete an application for the proposed work on a form
            furnished by the government entity. The form must include the following information: 62

                •    The name and address of the owner of the property;
                •    The name and address of the contractor;
                •    A description sufficient to identify the property to be improved, including the property's address
                     and legal description; and
                •    The name and address of the bonding company, if any;
                •    The name and address of the architecUengineer, if any;
                •    The name and address of the mortgage company, if any; and
                •    The number or identifying symbol assigned to the building permit by the issuing authority.

            In addition to the information that must be in the application, a government entity may require any
            additional information be included in the application. 63

           According to testimony offered during the Regular meeting of the Florida House of Representatives
           Regulatory Reform Subcommittee, many local governments use the cost of construction as a factor64



62
     Ss. 713.135(5) and (6), F.S.
63 Id.
64
   The International Code Council has created two equations to help jurisdictions determine their permit fee schedules. Two factors of
the factors in the equations are the valuation of the construction cost of the project, and the value of all the construction in the
jurisdiction in the previous year. See International Code Council, Building Valuation Data- February 2020,
https://www.iccsafe.org/wp-content/uploads/BVD-8SJ-FEB20.pdf (last visited Feb. 21, 2021 ).
STORAGE NAME: pcs1059.RRS.DOCX                                                                                               PAGE: 11
DATE: 2/26/2021
         for determining the amount of a fee for a building permit. 65 Some local governments are requiring
         contractors to include their contracts with private owners in order to obtain building permits so that the
         local government can determine the contract's construction cost and construction value. 66 Although
         these contracts may contain private proprietary information, when local governments request them they
         may become public documents. 67

         Required Information in Building Permit Application -- Effect of the Bill

         The bill prohibits a government entity from requiring a contract between an owner and a contractor or a
         contract between a contractor and a subcontractor or material supplier as a condition to apply for or
         obtain a building permit for construction work on a commercial property.

         However, this does not apply to any construction projects for improvements that are owned or leased
         by a government entity.


     B. SECTION DIRECTORY:
         Section 1:        Amends s. 125.022, F.S., relating to development permits and orders issued by
                           counties.

         Section 2:        Amends s. 125.56, F.S., requiring counties to allow submission of certain documents
                           and list certain things on their websites.

         Section 3:        Amends s. 166.033, F.S., relating to development permits and orders issued by
                           municipalities.

         Section 4:        Amends s. 553.79, F.S., requiring local governments to allow submission of certain
                           documents, list certain things on their websites, and reduce certain building permit fees.

         Section 5:        Amends s. 553.792, F.S., requiring local governments to reduce certain building permit
                           fees.

         Section 6:        Amends s. 553.794, F.S., requiring local governments to reduce certain building permit
                           fees.

         Section 7.        Amends s. 713.135, F.S., prohibiting local governments from requiring contracts in
                           certain applications for building permits.

         Section 8.        Providing an effective date of October 1, 2021 .


                              11. FISCAL ANALYSIS & ECONOMIC IMPACT STATEMENT

     A. FISCAL IMPACT ON STATE GOVERNMENT:


65
   City of Miami, City of Miami Building Permit Fee Schedule, https://www.miamigov.com/Services/Building-Permi.tting/City-of-
Miami-Building-Pennit-Fee-Schedule (last visited Feb. 21, 2021); St. Lucie County, Building Permit Fees,
https://www.stlucieco.gov/Home/ShowDocument?id= 1330 (last visited Feb. 21, 2021); City of Seminole, City ofSeminole Permit Fee
Schedule, https://www.myseminole.com/Bui1ding/Docs/Pennit Fees.pdf (last visited Feb. 21, 2021).
66 See The Florida Channel, 1/27I 2021 House Regulatory Reform Subcommittee, https://thefloridachannel.org/videos/1-27-21-house-

reguJatory-refonn-subcommittee/ (last visited Feb. 19, 2021 ).
67
   Article I, section 24(a) of the Florida Constitution sets forth the state's public policy regarding access to government records. This
section guarantees every person a right to inspect or copy any public record made or received in connection with official business of
any public body, including counties, municipalities, and districts. Current law does not contain an exemption from Florida's public
records laws for proprietary business information included in a building permit application. See generally, ch. 119. F.S.
STORAGE NAME: pcs1059.RRS.D0CX                                                                                                  PAGE: 12
DATE: 2/26/2021
       1. Revenues:
           None.

       2. Expenditures:
           See Fiscal Comments.

    B. FISCAL IMPACT ON LOCAL GOVERNMENTS:

       1. Revenues:
           None.

       2. Expenditures:
           See Fiscal Comments.

   C. DIRECT ECONOMIC IMPACT ON PRIVATE SECTOR:
       The bill may have a positive impact by decreasing the time it takes to obtain a building permit, which
       may decrease the cost and time to complete projects.

   D. FISCAL COMMENTS:
       The amount of permit fees that are refunded by local governments for failing to review a permit
       application within a certain time-period is indeterminate. However, any amount will likely be minimal. It
       is unclear if refunding a percentage of permit fees will have an impact on the surcharges received by
       DBPR. However, any impact will likely be insignificant.



                                                Ill. COMMENTS

   A. CONSTITUTIONAL ISSUES:

       1. Applicability of Municipality/County Mandates Provision:
          The county/municipality mandates provision of Art. VII, s. 18 of the Florida Constitution may apply
          because this bill requires local governments to take actions that require expenditures of money by
          requiring local governments to allow electronic submission of certain building permit application
          documents, and requiring them to post the current status of received building permit applications, to
          list the required documents to be included with a permit application, and to list their procedures for
          processing applications on their website. This may result in additional expenditures to comply with
          the statute. However, local building departments are permitted by state law to collect building fees
          that cover the cost of their expenses. An exemption may apply because the fiscal impact is likely to
          be insignificant.

       2. Other:
          None.

   B. RULE-MAKING AUTHORITY:
       None.

   C. DRAFTING ISSUES OR OTHER COMMENTS:
       None.
STORAGE NAME: pcs1059.RRS.D0CX                                                                            PAGE: 13
DATE: 2/26/2021
                         IV. AMENDMENTS/ COMMITTEE SUBSTITUTE CHANGES




STORAGE NAME: pcs1059.RRS.D0CX                                          PAGE: 14
DATE: 2/26/2021
FLORIDA                       H   O   U   S   E      0   F      REPRESENTATIVES




        PCS for HB 1059                                                      2021




 1                                         A bill to be entitled
 2              An act relating to construction permits; amending
 3              125.022, F.S.; amending the requirements for when
 4              counties request certain information; amending 125.56,
 5              F.S.; amending the requirements that counties post
 6              building permit applications and its procedures for
 7              reviewing applications online and allow applicants to
 8              submit applications electronically; amending 166.033,
 9              F.S.; amending the requirements for when
10              municipalities request certain information; amending
11              553.79, F.S.; amending the requirements that local
12              governments post building permit applications and its
13              procedures for reviewing applications online and allow
14              applicants to submit applications; providing for a
15              reduction of fees in certain circumstances; requiring
16              certain surcharges be recalculated under certain
17              conditions; amending 553.792, F.S.; providing for a
18              reduction of fees in certain circumstances; requiring
19              certain surcharges be recalculated under certain
20              conditions; amending s. 553.794, F.S.; providing for a
21              reduction of fees in certain circumstances; requiring
22              certain surcharges be recalculated under certain
23              conditions; amending 713.135, F.S.; providing that
24              building permit authorities may not require applicants
25              to provide certain contracts for certain types of

                                                      Page 1 of 12
     PCS for HB 1059
     CODING: Words stricken are deletions; words underlined are additions.
                                                                                    V
FLORIDA                       H   O   U   S   E      0   F      REPRESENTATIVES




        PCS for HB 1059                                                         2021



26              building permits; providing an effective date.
27
28      Be It Enacted by the Legislature of the State of Florida:
29
30              Section 1.         Subsection (2) of section 125.022, Florida
31      Statutes, is amended to read:
32              125.022       Development permits and orders.-
33               (2)~        When reviewing an application for a development
34      permit or development order that is certified by a professional
35      listed ins. 403.0877, a county may not request additional
36      information from the applicant more than three times, unless the
37      applicant waives the limitation in writing.
38               (b)      If a county makes a request for additional information
39      and the applicant submits the required additional information
40      within 30 days of receiving the request, the county must review
41      the application for completeness and issue a letter indicating
42      that all required information has been submitted or specify with
43      particularity any areas that are deficient within 30 days of
44      receiving the additional information.
45               (c)      If a county makes a second request for additional
46      information and the applicant submits the required additional
47      information within 30 days of receiving the request , the county
48      must review the application for completeness and issue a letter
49      indicating that all required information has been submitted or
50      specify with particularity any areas that are deficient within

                                                      Page 2 of 12
     PCS for HB 1059
     CODING: Words stricken are deletions; words underlined are additions.
                                                                                       V
FLORIDA                       H   O    U    S   E    0    F      R E P R E S E N T A T I V E S



        PCS for HB 1059                                                                          2021




51      10 days of receiving the additional information.
52              J.s!l Before a third request for additional information,                       the
53      applicant must be offered a meeting to attempt to resolve
54      outstanding issues.                If a county makes a third request for
55      additional information and the applicant submits the required
56      additional information within 30 days of receiving the request,
57      it must deem the application complete within 10 days or proceed
58      to process the application for approval or denial unless the
59      applicant waived the county's limitation in writing described in
60      paragraph (a).
61              J..§1 Except as provided in subsection (5), if the applicant
62      believes the request for additional information is not
63      authorized by ordinance, rule,                    statute, or other legal
64      authority, the county, at the applicant's request,                         shall proceed
65      to process the application for approval or denial.
66              Section 2.          Paragraph (b)         of subsection (4)      of section
67      125.56, Florida Statutes, is amended, and a new paragraph (f)                            is
68      added to that subsection to read:
69              125.56       Enforcement and amendment of the Florida Building
70      Code and the Florida Fire Prevention Code; inspection fees;
71      inspectors; etc.-
72               ( 4)

73               (b)      A county that issues building permits shall post each
74      type of building permit application,                         including a list of all
75      required attachments, drawings,                       or other requirements for each

                                                      Page 3 of 12
     PCS for HB 1059
     CODING: Words stricken are deletions; words underlined are additions.
                                                                                                        V
FLORIDA                        H   O   U   S   E      0   F      R E P R E S E N T A T I V E S



         PCS for HB 1059                                                               2021




 76      type of application, on its website. A county must post and
 77      update the status of every received application on its website
 78      until the issuance of the building permit. Completed
 79      applications, including payments, attachments, drawings, or
 80      other requirements or parts of the completed permit application,
 81      must be able to be submitted electronically to the county
 82      building department. Accepted methods of electronic submission
 83      include, but are not limited to, e-mail submission of
 84      applications in Portable Document Format or submission of
 85      applications through an electronic fill-in form available on the
 86      building department's website or through a third-party
 87      submission management software. Completed applications,
 88      including payments, attachments, er drawings, or other
 89      requirements or parts requi:red as part of the completed permit
 90      applicationL may also be submitted in person in a nonelectronic
 91      format, at the discretion of the building official.
 92               (f)      A county that issues building permits must post its
 93      procedures for processing, reviewing, and approving submitted
 94      building permit applications on its website.
 95              Section 3.         Subsection (2) of section 166.033, Florida
 96      Statutes, is amended to read:
 97              166.033       Development permits and orders.-
 98               (2)~        When reviewing an application for a development
 99      permit or development order that is certified by a professional
100      listed ins. 403.0877, a municipality may not request additional

                                                       Page 4 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                              V
FLORIDA                        H   O   U   S   E      0   F      REPRESENTATIVES




         PCS for HB 1059                                                        2021




101      information from the applicant more than three times, unless the
102      applicant waives the limitation in writing.
103               (b)      If a municipality makes a request for additional
104      information and the applicant submits the required additional
105      information within 30 days of receiving the request, the
106      municipality must review the application for completeness and
107      issue a letter indicating that all required information was
108      submitted or specify with particularity any areas that are
109      deficient within 30 days of receiving the additional
110      information.
111               (c)   If a municipality makes a second request for additional
112      information and the applicant submits the required additional
113      information within 30 days of receiving the request, the
114      municipality must review the application for completeness and
115      issue a letter indicating that all required information was
116      submitted or specify with particularity any areas that are
117      deficient within 10 days of receiving the additional
118      information.
119              ls!l Before a third request for additional information,      the
120      applicant must be offered a meeting to attempt to resolve
121      outstanding issues. If a municipality makes a third request for
122      additional information and the applicant submits the required
123      additional information within 30 days of receiving the request,
124      it must deem the application complete within 10 days or proceed
125      to process the application for approval or denial unless the

                                                       Page 5 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                       V
FLORIDA                        H   O   U   S   E      0   F      REPRESENTATIVES




         PCS for HB 1059                                                                    2021




126      applicant waived the municipality's limitation in writing
127      described in paragraph (a} .
128              ~         Except as provided in subsection (5), if the applicant
129      believes the request for additional information is not
130      authorized by ordinance, rule, statute, or other legal
131      authority, the municipality, at the applicant's request, shall
132      proceed to process the application for approval or denial.
133              Section 4.         Paragraph (b) of subsection (1) and subsection
134       (14) are amended, new paragraph (d)                     is added to that subsection
135       (1), to read:
136              553.79       Permits; applications; issuance; inspections.-
137               (1)

138               (b)      A local enforcement agency shall post each type of
139      building permit application, including a list of all required
140      attachments, drawings, or any other requirement for each type of
141      application, on its website. A local enforcement agency must
142      post the current status of every received application on its
143      website until the issuance of the building permit. Completed
144      applications, including payments, attachments, drawings, or any
145      other requirements or parts of the completed permit application,
146      must be able to be submitted electronically to the appropriate
147      building department. Accepted methods of electronic submission
148      include, but are not limited to, e-mail submission of
149      applications in Portable Document Format or submission of
150      applications through an electronic fill-in form available on the

                                                       Page 6 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                   V
FLORIDA                        H   O    U   S   E     0    F     REPRESENTATIVES




         PCS for HB 1059                                                         2021




151      building department's website or through a third-party
152      submission management software. Completed applications,
153      including payments, attachments, er drawings, or any other
154      requir e ments or parts requi red as part of the completed permit
155      applicationL may also be submitted in person in a nonelectronic
156      format, at the discretion of the building official.
157               (d)      A local enforcement agency must post its procedures
158      for processing, reviewing, and approving submitted building
159      permit applications on its website.
160               (14)      A building permit for a single-family residential
161      dwelling must be issued within 30 business ',rnrking days of
162      receiving the application therefor unless unusual circumstances
163      require a longer time for processing the application or unless
164      the permit application fails to satisfy the Florida Building
165      Code or the enforcing agency's laws or ordinances.
166               (a)      If a local enforcing agency fails to issue a building
167      permit for a single-family residential dwelling within 30
168      business days of receiving the application, it must reduce the
169      building permit fee by 10 percent for each business day that the
170      enforcing agency fails to meet the deadline. Each 10 percent
171      reduction shall be based on the original amount of the building
172      permit fee.
173               (b)      A local enforcing agency does not have to reduce such
174      fee, if the enforcing agency provides written notice to the
175      applicant, by e-mail or United States Postal Service, within 30

                                                       Page 7 of 12
      PCS for HB 1059
      CODING: Words strioken are deletions; words underlined are additions.
                                                                                        V
FLORIDA                         H   O   U   S   E      0   F      R E P R E S E N T A T I V E S



          PCS for HB 1059                                                               2021




17 6      business days of receiving the application, that specifically
177       states why the application fails to satisfy the Florida Building
178       Code, or the enforcing agency's laws or ordinances.
179                (c)      The applicant has 10 business days to address the
180       reasons specified by the local enforcing agency and submit
181       revisions to correct the application. If the permit applicant
182       submits revisions within 10 business days of receiving the
183       notice, the local enforcing agency has 10 business days to
184       approve or deny the permit unless the applicant agrees to a
185       longer period in writing. If the local enforcing agency fails to
186       issue or deny the building permit within 10 business days of
187       receiving the revisions, it must reduce the permit fee by 20
188       percent for the first day that the enforcing agency fails to
189       meet the deadline unless the applicant agrees to a longer period
190       in writing. For each additional business day after the first day
191       that the enforcing agency fails to meet the deadline, the permit
192       fee must be reduced by an additional 10 percent for each
193       business day that the enforcing agency fails to meet the
194       deadline, for up to 5 business days. Each reduction shall be
195       based on the original amount of the building permit fee.
196                (d) If any permit fees are refunded under this subsection,
197       the surcharges provided for ins. 553.721 ors. 468.631 must be
198       recalculated based on the amount of the permit fees after the
199       refund.
200               Section 5.         Section 553.792, Florida Statutes, is amended

                                                        Page 8 of 12
       PCS for HB 1059
       CODING: Words strisken are deletions; words underlined are additions.
                                                                                               V
F     L   O   R     D A        H   O   U    S   E     0    F     REPRESENTATIVES




          PCS for HB 1059                                                       2021




201       to read:
202               553.792       Building permit application to local government.-
203               (l)J.tl     Within 10 days of an applicant submitting an
204       application to the local government, the local government shall
205       advise the applicant what information, if any, is needed to deem
206       the application properly completed in compliance with the filing
207       requirements published by the local government. If the local
208       government does not provide written notice that the applicant
209       has not submitted the properly completed application, the
210       application shall be automatically deemed properly completed and
211       accepted. Within 45 days after receiving a completed
212       application, a local government must notify an applicant if
213       additional information is required for the local government to
214       determine the sufficiency of the application, and shall specify
215       the additional information that is required. The applicant must
216       submit the additional information to the local government or
217       request that the local government act without the additional
218       information. While the applicant responds to the request for
219       additional information, the 120-day period described in this
220       subsection is tolled. Both parties may agree to a reasonable
221       request for an extension of time, particularly in the event of a
222       force majeure major or other extraordinary circumstance. The
223       local government must approve, approve with conditions, or deny
224       the application within 120 days following receipt of a completed
225       application.

                                                       Page 9 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                       V
FLORIDA                        H   O   U   S   E      O   F      REPRESENTATIVES




         PCS for HB 1059                                                                      2021




226               (b)      If a local government does not meet a deadline
227      provided for in paragraph (a), it must reduce the building
228      permit fee by 10 percent for each business day that the
229      enforcing agency fails to meet the deadline. Each 10 percent
230      reduction shall be based on the original amount of the building
231      permit fee , unless the parties agree to an extension of time.
232               (2)___@J_   The procedures set forth in subsection (1) apply to
233      the following building permit applications: accessory structure;
234      alarm permit; nonresidential buildings less than 25,000 square
235      feet; electric; irrigation permit; landscaping; mechanical;
236      plumbing; residential units other than a single family unit;
237      multifamily residential not exceeding 50 units; roofing; signs;
238      site-plan approvals and subdivision plats not requiring public
239      hearings or public notice; and lot grading and site alteration
240      associated with the permit application set forth in this
241      subsection. The procedures set forth in subsection (1) do not
242      apply to permits for any wireless communications facilities or
243      when a law, agency rule, or local ordinance specify different
244      timeframes for review of local building permit applications.
245               (b)      If a local government has different tirnefrarnes than
246      the procedures set forth in subsection (1)                           for reviewing
247      building permit applications described in paragraph (a), the
248      local government must meet the deadlines established by local
249      ordinance. If a local government does not meet an established
250      deadline to approve, approve with conditions, or deny an

                                                      Page 10 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                                     V
 FLORIDA                        H   O   U    S   E     0   F      REPRESENTATIVES




          PCS for HB 1059                                                          2021




251       application, it must reduce the building permit fee by 10
252       percent for each business day the enforcing agency fails to meet
253       the deadline. Each 10 percent reduction shall be based on the
254       original amount of the building permit fee, unless the parties
255       agree to an extension of time. This paragraph does not apply to
256       permits for any wireless communications facilities.
257                (3)      If any permit fees are refunded under this section,
258       the surcharges provided for ins. 553.721 ors. 468.631 must be
259       recalculated based on the amount of the permit fees after the
260       refund.
261               Section 6.          Paragraph (c) of subsection (5) of section
262       553.794, Florida Statutes, is amended to read:
263               553.794       Local government residential master building
264       permit program.-
265                (5)      MASTER BUILDING PERMIT APPLICATION APPROVAL PROCESS.-
266                (c)      The local building department must approve or deny a
2 67      master building permit application within 120 days after the
268       local building department receives a completed application,
269       unless the applicant agrees to a longer period. If a local
270       building department fails to approve or deny a master building
271       permit application within 120 days of receiving the completed
272       application, it must reduce the building permit fee by 10
273       percent for each business day the enforcing agency fails to meet
274       the deadline, unless the applicant agrees to a longer time
275       period. Each 10 percent reduction shall be based on the original

                                                       Page 11 of 12
       PCS for HB 1059
       CODING: Words stricken are deletions; words underlined are additions.
                                                                                          V
FLORIDA                        H   O    U   S   E     0    F      R E P R E S E N T A T I V E S



         PCS for HB 1059                                                                2021




276      amount of the building permit fee. If any permit fees are
277      refunded, the surcharges provided for ins. 553.721 ors.
278       468.631 must be recalculated based on the amount of the permit
279      fees after the refund.
280              Section 7.          Present subsections (6) through (7) of section
281      713.135, Florida Statutes, are redesignated as subsections (7)
282      through (8), respectively, new subsection (6) is added to that
283      section, to read:
284              713.135        Notice of commencement and applicability of liert.-
285               (6)      An authority that issues building permits may not
286      require an applicant to provide a direct contract or a contract
287      between a contractor and any other lienor as a condition of the
288      application for,           or processing or issuance of, a building permit
289      for the construction of improvements or for the alteration or
290      repair of improvements on or to commercial property. This
291      subsection does not apply to the construction of improvements or
292      the alteration or repair of improvements owned or leased by the
293      federal government, the state or any county, city, or political
294      subdivision thereof, or other public authority.
295              Section 8.         This act shall take effect October 1, 2021.




                                                      Page 12 of 12
      PCS for HB 1059
      CODING: Words stricken are deletions; words underlined are additions.
                                                                                               V


File and source

File
2021-03-02_3101_regulatory-reform-subcommittee_meeting-packets_fn-rrs-3-2-21.pdf
Size
17,322,361 bytes
SHA-256
785e4d4855eee6f9ded0a1472d9a30c032d8d9c2cda82f705c8a6b1a94eb951c
Our copy
2021-03-02_3101_regulatory-reform-subcommittee_meeting-packets_fn-rrs-3-2-21.pdf
Original
No public link identified.
Back to top