Pandemic Darlings The pandemic economy, in original documents
Home Source documents Letter and Report - Innovation and Technology Transportation Fund (January 24, 2020)

Letter and Report - Innovation and Technology Transportation Fund (January 24, 2020)

Summary

A letter dated January 24, 2020 from Stephen C. Brich, P.E., Commissioner of the Department of Transportation, to Governor Ralph S. Northam and members of the Virginia General Assembly. It provides the annual report on the use of moneys in the Innovation and Technology Transportation Fund (ITTF), which the letter says are to be used solely for pilot programs and fully developed initiatives pertaining to high-tech infrastructure improvements. The attached report states that there are currently thirty-nine projects included in the ITTF program, of which thirteen were added with the approval of the Commonwealth Transportation Board in June 2019. It describes the Northern Virginia Regional Multi-Modal Mobility Program and includes project tables.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Cite this document

“Letter and Report - Innovation and Technology Transportation Fund (January 24, 2020).” Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2020-rd68-a5d02dfeb4/, SHA-256 e6bc7ccac01e05b1c85a79ef7b5bd0ab2e7ff5496cf3e35e1b4ca50db0a5ff9b.

Full text

                             COMMONWEALTH of VIRGINIA
                                              DEPARTMENT OF TRANSPORTATION
                                                       1401 EAST BROAD STREET
                                                    RICHMOND, VIRG INIA 23219-2000
Stephen C. Brich, P.E.
    COMMISSIONER


        January 24, 2020


        The Honorable Governor Ralph S. Northam
        Members of the Virginia General Assembly

        Dear Ladies and Gentlemen:

        Section 33 .2-1531 of the Code of Virginia directs the Commissioner of Highways to report annually on
        the use of moneys in the Innovation and Technology Transportation Fund (ITTF). This letter provides the
        information as required by the statute.

        ITTF monies are to be used solely for the purposes of funding pilot programs and fully developed
        initiatives pertaining to high-tech infrastructure improvements that reduce congestion, improve mobility,
        improve safety, provide up-to-date travel data, or improve emergency response.

        The current estimated total value of allocations for projects eligible for ITTF funding ('·(TTF Projects") is
        $122.9 mi Ilion. This number consists of$ I 07 million, which was allocated to the ITTF for FY 2019
        through FY 2024 by the Commonwealth Transportation Board (CTB) pursuant to an action dated June
        19, 2018, and $15.9 million of allocations/projections of the CTB pursuant to the portion of the
        alternative CTB formula dedicated to smart roadway technology projects, prior to enactment of the ITTF,
        for FY 2019 through FY 2020.

        The attached report provides a status update on active projects funded prior to July 2019 and a description
        of projects approved by the CTB in June 2019.

        If you have any questions, please do not hesitate to contact Cathy McGhee, PE, Director of Research and
        Innovation at catby.rncghee(al,vdot. virginia.gov or 804-916-9508, or me.

        Sincerely,


       ~Stephen C. Brich, P.E.

        Attachment

        Cc:        The Honorable Ms. Shannon Valentine
                   Cathy McGhee, PE


                                                    VirginiaDOT.org
                                               WE KEEP VIRGINIA MOVING
                  Innovation and Technology Transportation Fund
                          Report to the General Assembly

Section 33.2-1531 of the Code of Virginia establishes the Innovation and Technology
Transportation Fund (ITTF). ITTF monies are to be used solely for the purposes of funding pilot
programs and fully developed initiatives pertaining to high-tech infrastructure improvements that
reduce congestion, improve mobility, improve safety, provide up-to-date travel data, or improve
emergency response. There are currently thirty-nine projects included in the ITTF program. Of
those, thirteen were added with the approval of the Commonwealth Transportation Board (CTB)
in June 2019.

This report provides an update of the earlier twenty-six projects and descriptions of the new
projects. The graphic below categorizes the new projects according to the ITTF goals that each
project will contribute.




Northern Virginia Regional Multi-Modal Mobility Program
Regional Multi-Modal Mobility Program (RM3P) will take a collaborative, integrated, and
cohesive approach to improve safety, accessibility, and mobility, and mitigate congestion for the
traveling public in the Commonwealth of Virginia, especially in the Northern Virginia region.
RM3P will leverage artificial intelligence (AI) and machine learning algorithms to extract
information from multiple data sources to provide real-time information for both system operators
and the traveling public. The overall program includes five separate but interrelated projects
including the development of:

    •   Data lake/data store
    •   Parking availability system to facilitate carpooling and transit use
    •   Mobility as a service (MaaS) dashboard to identify gaps in service that limit transit use
    •   Decision support tools that create information from multiple data sources
    •   Commuter incentive program that will reduce congestion during the worst travel
        conditions by encouraging commuters to travel at a different time, take a different route,
        or use a different mode

A high level schedule for RM3P is provided below.




Performance Parking in Commercial Corridors

Arlington County experiences high levels of both commuter and commercial traffic. This project
will target increases in efficiency for parking in two Metrorail corridors. Smart parking meters
will be deployed, along with data-driven variable pricing and real-time information, to optimize
utilization of parking spaces and reduce congestion that results from motorists searching for
available parking. A similar program in San Francisco resulted in 25% fewer miles traveled, a
reduction in parking search times by 43%, and a 30% decrease in greenhouse gas emissions.
Concerns about significant increases in parking costs were shown to be unfounded in San
Francisco where average parking rates actually declined. This project will be managed locally by
Arlington County and is expected to kick off in mid-2020.
I-95 Variable Speed Limits
The Interstate 95 (I-95) corridor is one of the busiest commuter corridors in the Commonwealth
while also serving a high number of long-distance travelers. As a result, significant congestion
occurs both during the weekday peak periods and during weekend travel times. In general,
solutions to commuter-based congestion are different than solutions that target congestion
stemming from weekend or long distance travel patterns. Variable speed limits (VSL), or “speed
harmonization,” is a solution that can target both forms of travel delay. By managing the flow of
traffic, VSLs can decrease the impact of queueing by reducing the speed of traffic as it approaches
a slowdown. Slowing traffic down gradually – rather than having hard braking at the end of a
queue – keeps the overall traffic stream moving smoother and reduces the frequency of rear-end
collisions. VSL deployments in Germany have resulted in 5-15% reductions in travel time, 30%
reductions in crashes, and 5% increases in throughput. It should be noted that many European
countries that experience these benefits have automated speed enforcement as a key part of their
deployments. When VSL was deployed on I-66 in Northern Virginia several years ago, benefits
were limited due to low rates of compliance with posted speeds. The I-95 deployment will include
speed-monitoring capability combined with vehicle identification so that individual drivers can be
contacted and provided educational information regarding the benefits of VSL. The compliance
data collected will also be useful in determining ways to make VSL more effective in Virginia.

The I-95 VSL project will be coordinated with other projects identified through the I-95 corridor
improvement study. Anticipated start date for project design is summer 2020.

Interstate 81 Operational Improvements
The I-81 Corridor Improvement Study identified a number of operational improvements that
would enhance incident management and reduce delays. Many of these improvements included
the deployment of additional field devices, such as cameras and dynamic message signs, to detect
problems and disseminate real-time information to the public. Funds allocated through the ITTF
program will seek to use those devices and the data they collect to further improve traffic flow and
safety throughout the corridor. Several emphasis areas have been identified for consideration
including:

   •   Commercial vehicle operations and safety
           o Truck parking
           o Decision support/routing
           o Speed differentials
   •   Incident and work zone management
           o Real-time information
           o Diversion route operations (including traffic signals)
           o Predictive data analytics
   •   Speed management and enforcement
   •   Queue warning and management
The I-81 ITTF operational improvement project will be coordinated with the overall I-81 Corridor
Improvement program and will be underway in early 2020.

Interstate 64 Operational Improvements
I-64 west of Charlottesville experiences a higher than normal crash rate. A steep grade, frequent
fog, and a high number of animal-vehicle collisions all contribute to the crash rate. A number of
potential improvements have been considered to enhance safety through the corridor. “Smart”
roadway lighting and a congestion management system, including cameras and dynamic message
signs, were determined to be the most effective options, given the characteristics of the corridor.

The I-64 operational improvements are part of a larger corridor safety improvement program that
will kick off in mid-2020.

Data Analytics for Safety
The Virginia Department of Transportation (VDOT), like other state DOTs, uses a wealth of data
to identify safety challenges and appropriate mitigation strategies. Traditionally, this information
has focused on historical traffic and crash data. More recently, the addition of other data sources
has proven beneficial in determining both safety priorities as well as ways to address them. For
example, pavement friction data combined with crash data has been valuable in identifying
locations at which high friction surfaces can greatly reduce the occurrence of roadway departure
crashes. This project will explore a variety of additional data sources, including census data, land
use data, enhanced weather data, special event data, alcohol data (locations of sales and use),
health-related data, and data from the Department of Education to identify correlations with
roadway safety. AI and machine learning will be applied to the data to create information
regarding crash likelihood and potential mitigation strategies that could be beneficial in reducing
crash risk.

The scope for the initial build of the platform has been drafted and work will be underway in early
2020.

Arterial Operations Dashboard
The “Arterial Operations Dashboard” is a reporting tool that can provide travel time information
and signal performance information in a single tool. The tool will be implemented on arterials
across the Commonwealth, beginning with the Corridors of Statewide Significance (CoSS). This
24/7 performance data will facilitate better management of arterials during incidents on the
interstates when there are detours and rerouting of traffic, as well as for general everyday use. It
is important to note that the tool can be applied to signals owned and operated by our locality
partners in addition to VDOT signals.
Overall, the arterial operations dashboard will:

   •   leverage ongoing efforts to upgrade signal controllers and deploy a central signal system
       to provide performance metrics on arterials statewide that enable improved real-time
       operations;
   •   provide metrics on signal performance and travel time reliability in one tool; and
   •   begin with an initial deployment on 70 corridor segments (1,128 intersections), including
       corridors through about 50 localities and towns.

The arterial operations dashboard project will be integrated into the deployment of the statewide
central signal software platform. Anticipated deployment is in late 2020.

High Speed Communications for Signalized Intersections
VDOT currently operates and maintains over 3,000 signalized intersections across the
Commonwealth. In addition to being vital to normal operations on the arterial network, those
intersections are often required to serve much higher volumes of traffic when an incident or other
special event occurs. The ability to respond to changes in demand, modify signal timing
parameters in real time, and monitor the flow of traffic is critical from both a local operations and
system-wide perspective. Currently, approximately 35% of VDOT traffic signals lack sufficient
communications to operate at peak efficiency. A communications master plan has been developed,
which identifies gaps in VDOT’s communications network – including these intersections – and
an implementation plan is under development that will prioritize the elimination of those gaps.
When complete, this effort will contribute to enhanced incident management, improved safety and
operations, and reduced overall agency costs by eliminated leased lines.

This will be an ongoing effort, beginning in mid-2020.

Parking Demand Management System
There are a number of park-and-ride lots in the I-95 corridor
that serve the Virginia Railway Express. As commuters
approach these lots, there is currently no information
available on the status of parking availability. This project
will deploy sensors at the entrance and exit points of the
parking lots to determine the number of available spaces in
real time. Dynamic message signs will be deployed to provide
information prior to the exit. Additionally, the data will be
made available for third-party applications that can more
broadly disseminate the data.

This project will begin in early 2020.
Cybersecurity Enhancements for Operations Technology
VDOT’s operations program includes a large number of field devices, and each of those is a
potential point of vulnerability if the proper cybersecurity controls and processes are not in place.
This project will contribute to a larger effort of fully securing the Operations Technology network.
Full design of all mitigation strategies is underway, with completion expected in June 2021.

Pilot Program for Innovation
A number of small companies located in Virginia are creating innovative solutions to many of the
transportation challenges we face. This program will provide VDOT with the opportunity to
partner with the Center for Innovative Technology (CIT) to put out calls for solutions to specific
challenges among CIT’s network of small and start-up, Virginia-based companies. Responses
would then be evaluated, and one or more would be selected for piloting and evaluation. The
Commonwealth Transportation Board Innovation and Technology Subcommittee will help to
determine the highest priority challenges and the potential innovations to pilot. This will have
dual benefits of both improving transportation and providing economic development opportunities
to Virginia companies.

Design of the program evaluation criteria is underway, and the first round of concept solicitations
is anticipated in summer 2020.

Innovation Program for Localities
Many transportation challenges are encountered at the local level and would benefit from locally
derived solutions. This program will allow localities to submit proposals for funding within the
ITTF program. All proposals will be required to meet the criteria described in the Code of Virginia
(i.e., reduce congestion, improve mobility, improve safety, provide up-to-date travel data, or
improve emergency response), and any selected projects will be fully evaluated for potential
deployment in other areas of the Commonwealth. The CTB Subcommittee on Innovation and
Technology will help to determine which proposals to fund.

It is anticipated that localities will be invited to submit proposals for innovative project funding in
fall 2020.

Statewide Technology for Operations
A number of technologies that have been tested or piloted elsewhere could provide significant
benefit(s) to Virginia. This project will select a small number of initiatives for deployment and
evaluation to determine the best path forward for optimal statewide deployment. Some possible
technologies include:

   •   Customer service bots – automated systems that are capable of handling routine or low-
       priority calls during high volume events to free customer service agents for higher priority
       issues
   •   Worker alert system – an alert system that would provide a geo-fenced presence alert
       through third-party apps or agency-developed systems when workers are at risk of being
       struck by an errant vehicle
   •   Virtual Active Traffic Management (ATM) – a system that utilizes wireless
       communications and smartphone-based apps to provide the benefits of an ATM without
       the heavy infrastructure investment

Selected projects will begin in 2020.

In addition to these new projects, there are a number of efforts underway that were funded through
previous CTB actions. The following tables provide an update on those projects.
                                                        “ITTF Projects” Allocated Funding in FY19 1


                                                           Funding
                                                          Allocation       Expenditures
     UPC /                                                                                    Expenditures                          Status
                              Project Purpose             FY19 Final         to Date
    Location                                                                                     FY 19
                                                             SYIP


     104591          Interstate ITTF Technology –                                                               This line item is a funding source for breakout
                                                          $3,379,827             $0                 $0
    Statewide        Equipment Upgrades                                                                         projects


                     Richmond TOC Upgrade to house
                     future transportation technology
     109482                                                                      $0
                     equipment and operations to          $2,259,880                                $0          Construction underway
    Richmond
                     improve traffic surveillance and
                     management.

                Grand Total FY-19 Funding Allocation      $5,639,707




1
 Information concerning FY18 allocations and expenditures for “ITTF Projects” may be found in the FY18 report published on Virginia’s Legislative Information
System at: https://rga.lis.virginia.gov/Published/2018/RD565
                 Ongoing / Completed Projects

                                                                Total
                                                                          Expenditures   Expenditures
UPC / Location                Project Purpose                 Allocatio                                                         Status
                                                                            to Date         FY-19
                                                                  ns

                 Prepare design plans for an upgraded
   105368                                                                  $500,346
                 control room to improve traffic operations   $695,371                      $512        Complete; project closeout process underway
Hampton Roads
                 at the Hampton Roads Bridge Tunnel

                 Prepare design plans for signal
   105369        improvements for Route 1 from Caroline
                                                              $525,000     $366,283       $208,493      Design plans underway
  Richmond       County to Colonial Heights to improve
                 traffic flow

   105380        Improve traffic management at the Big                     $242,824
                                                              $368,233                     $13,549      Preliminary design underway
   Bristol       Walker Mountain Tunnel

   105381        Improve traffic management at the East
                                                              $588,233     $230,371        $13,541      Preliminary design underway
   Bristol       River Mountain Tunnel

                 Prepare design plans to improve traffic
   105388                                                                  $433,930
                 operations at the I-664 Monitor Merrimac     $620,448                    $179,368      Design plans underway
Hampton Roads
                 Tunnel

                 Signal improvements for US 60 between
   105404                                                                  $277,435
                 New Kent and Newport News to improve         $385,000                     $22,231      Design plans underway
Hampton Roads
                 traffic flow



                 I-95 Corridor Technology on Rt. 1, 17;
   105443        Signal Communications Camera – Prince
                                                              $540,000     $358,404        $78,926      Preliminary engineering work underway
Fredericksburg   William to Hanover to improve situation
                 awareness and the management of traffic



                 Signal improvements for US 60 between                                                  Reported complete in FY17; however, the project was
   105444
                 New Kent and Richmond to improve traffic     $180,000      $52,250         $713        placed on hold & then re-started; Construction is
  Richmond
                 flow                                                                                   underway
                                                                      Total
                                                                                Expenditures   Expenditures
UPC / Location                    Project Purpose                   Allocatio                                                           Status
                                                                                  to Date         FY-19
                                                                        ns
                    Install signal improvements with CCTV
    107541          improvements for arterial highways in                                                     Construction complete; project closeout process
                                                                    $384,711       $301,238      $9,683
Northern Virginia   Northern Virginia to improve traffic flow for                                             underway
                    US 1 - Phase 3
                    Install signal and camera improvements on
    107545                                                                       $369,690                     Construction complete; project closeout process
                    Routes-29, 50, 7, 236 in Northern Virginia      $533,206                     $18,885
Northern Virginia                                                                                             underway
                    to improve traffic flow - Phase 3
                    Intelligent Transportation System
    107663          Deployment – District wide Fredericksburg       $3,800,0
                                                                                 $160,630        $5,140       Construction underway
 Fredericksburg     District – Deployment of various signal            00
                    related technology
                    Intelligent Transportation System
    107818          Deployment – Districtwide Richmond              $3,366,2
                                                                                 $518,428       $365,663      Construction underway
   Richmond         District – Deployment of various signal            50
                    related technology
                    ITTF Arterial Operation Improvements for
   109232           US 60, Route 143 & 199 to improve travel        $1,391,6                                  Construction complete; project closeout process
                                                                                $1,120,149     $1,104,435
Hampton Roads       on the parallel routes to I-64 around the          01                                     underway
                    Williamsburg area.
                    I-66 Corridor Technology Advancements for
    109487          Route 29, 50, 7, & 236 Connected Vehicle
                                                                    $500,000                    $337,915      Complete; project closeout process underway
Northern Virginia   Development to promote this emerging                         $500,000
                    technology to improve safety and mobility
                                                                                                              This line item is a funding source for breakout projects;
    109506          Statewide Communitywide Adaptive Signal
                                                                    $638,399        $0             $0         awaiting additional funding to develop a new breakout
   Statewide        Control
                                                                                                              project.
                    Safety Service Patrol Communications
    110208
                    Upgrade to improve incident management          $225,000     $217,946         $456        Complete; project closeout process underway
   Statewide
                    to minimize delays.
                    I-95 & I-66 Corridor Technology
    110497          Advancement – System Security
                                                                    $441,047     $393,786       $381,632      Complete; project closeout process underway
Northern Virginia   Enhancement for networks & Information
                    Technology systems
                                                                Total
                                                                          Expenditures   Expenditures
UPC / Location                Project Purpose                 Allocatio                                                         Status
                                                                            to Date         FY-19
                                                                  ns
                 I-95 Ramp Metering to improve traffic
   110561
                 management and reduce congestion             $200,000      $89,529        $2,531       Complete; project closeout process underway
  Statewide
                 (Design only)
                 Statewide Truck Parking Management
   110912
                 System – Phase 1 to improve safety for       $925,000     $813,048       $207,816      Complete; project closeout process underway
  Statewide
                 commercial vehicle operations

                 Statewide Truck Parking Management
   111613                                                     $1,807,0
                 System – Phase 2 to improve safety for                    $292,543         $146        Design plans underway
  Statewide                                                      00
                 commercial vehicle operations
                 Advanced Traffic Management System –
                 Phases 1,2,3,4 to support implementation /
   111892                                                     $10,900,
                 upgrades to advanced traffic management                  $6,663,351     $3,369,856     Project underway
  Statewide                                                     000
                 system; This is VDOT’s Master Traffic
                 Control System

                 Pedestrian Collision Avoidance System to
   112254                                                                   $86,167
                 improve transit travel times & transit       $250,000                     $86,167      Retrofits underway
  Statewide
                 system reliability



   112895        Statewide Advanced Traffic Signal            $3,000,0     $291,569       $288,327      Construction underway
  Statewide      Controllers                                     00




   114400                                                                    $229
                 Drone Technology                             $250,000                      $229        Procurement underway
  Statewide


File and source

File
2020-RD68.pdf
Size
695,212 bytes
SHA-256
e6bc7ccac01e05b1c85a79ef7b5bd0ab2e7ff5496cf3e35e1b4ca50db0a5ff9b
Our copy
2020-RD68.pdf
Original
No public link identified.
Back to top