Summary

The Washington State Department of Commerce’s Early Learning Facilities Report of December 2020, a progress report to the Legislature under RCW 43.31.583 and House Bill 1102, Section 1037(7), Laws of 2019, Chapter 413. It reports that the Early Learning Facilities (ELF) Program, launched in 2017, has funded 43 major construction/renovation projects, nine minor renovation projects and 10 pre-design projects, creating or retaining 5,216 early learning slots, of which 3,953 are ECEAP or WCCC slots. The report states that the program has leveraged $88.9 million in non-state resources through $42.9 million in ELF grants and that, as of August 2020, approximately 18% of child care providers had closed at least temporarily. It recommends cutting the commitment period for grantees receiving $200,000 or more from 20 years to 10 years and allowing land only projects.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Issuer
Congressional materials
Document type
Report
Case
2020 Early Learning Facilities Report 94F6Da3F Bdd6 4027 8D10 307E95Fffe05

Cite this document

“Early Learning Facilities Report 2020 — Washington State Department of Commerce.” Original at app.leg.wa.gov. Archived at Pandemic Darlings, https://pandemicdarlings.com/source-documents/2020-early-learning-facilities-report-94f6da3f-bdd6-4027-8d10-307e95fffe05/, SHA-256 39b728cca5fde27c15154416d57f9df1d439c8f1d1cdf63b994bb8cdae007ff2.

Full text

 Early Learning Facilities
 Report



Progress report per RCW 43.31.583 and House Bill 1102, Section
1037(7), Laws of 2019, Chapter 413




                                              December 2020
      COMMUNITY CAPITAL
      FACILITIES                              REPORT TO THE LEGISLATURE

                                              Lisa Brown, Director
2.3
Acknowledgments

Washington State Department of Commerce
Mark Barkley, Assistant Director, Local Government
Division

Tony Hanson, Deputy Assistant Director, Local
Government Division

Matt Mazur-Hart, Community Facilities Manager,
Community Capital Facilities Unit

Tanya Mercier, Community Facilities Supervisor,
Community Capital Facilities Unit



Washington State Department of Children, Youth,
and Families
Grace Ssebugwawo, Community Funded ECEAP and
Facilities Specialist, Early Learning Programs Division

Lisa Hall, Early Learning Fund Specialist, Early
Learning Programs Division




Washington State Department of Commerce


EARLY LEARNING FACILITIES PROGRAM

Community Capital Facilities Unit

1011 Plum St. SE
P.O. Box 42525
Olympia, WA 98504-2525

www.commerce.wa.gov

For people with disabilities, this report is available on
request in other formats. To submit a request, please call
360.725.4000 (TTY 360.586.0772)




 EARLY LEARNING FACILITIES PROGRAM - 2020
Table of Contents
Executive Summary .............................................................................................................................................................. 2

Introduction ........................................................................................................................................................................... 3

Early Learning Facilities Gaps ............................................................................................................................................ 4

Early Learning Facilities Program Overview .................................................................................................................... 5

Program Recommendations ................................................................................................................................................. 6

Project Categories and Added Capacity ............................................................................................................................. 7

Major Construction and Renovation Projects ................................................................................................................... 8

Minor Renovation Projects .................................................................................................................................................. 9

Pre-Design Projects ............................................................................................................................................................. 10

School District Projects ...................................................................................................................................................... 11

Direct Appropriation Projects ........................................................................................................................................... 12

All Commerce-Funded Early Learning Facilities ............................................................................................................ 13

Bibliography ........................................................................................................................................................................ 21

Appendix A - Administering a capital budget appropriation ......................................................................................... 22




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                           1
Executive Summary
Authorizing Legislation
The 2018 Legislature passed SB 6287 requiring Commerce to report on funding from the Early Learning Facility program
as follows:

     When funding is provided in the previous biennium, the department, in collaboration with the department of children, youth, and
     families, shall submit a report no later than December 1st of even-numbered years, to the governor and the appropriate
     committees of the legislature that provides an update on the status of the early learning facilities grant and loan program that
     includes, but is not limited to:

     (1) The total amount of funds, by grant and loan, spent or contracted to be spent; and

     (2) A list of projects awarded funding including, but not limited to, information about whether the project is a renovation or new
     construction or some other category, where the project is located, and the number of slots the project supports.

The 2019 Legislature specified additional requirements through the capital budget, HB 1102 Section 1037(7) as follows:

     (7) The department of commerce must track the number of slots being renovated separately from the number of slots being
     constructed and, within these categories, must track the number of slots separately by program for the working connections child
     care program and the early childhood education and assistance program.

This is the initial report on program funding as required by these two statutes.

Funding Overview and Recommendations
Commerce's Early Learning Facilities (ELF) Program provides funding to early learning providers for construction,
renovation, and acquisition projects that increase or retain early learning capacity throughout the state. The ELF
Program launched in 2017 to help our state reach its goal of ensuring all children are prepared to enter kindergarten.

Since its inception, the ELF Program has funded 43 major construction/renovation projects, nine minor renovation
projects, and 10 pre-design projects for early learning providers. The program has also funded projects at eight school
districts and 17 facilities specifically identified by the Legislature. In total, the program has created or retained 5,216 early
learning slots, of which 3,953 are either Early Childhood Education and Assistance Program (ECEAP) or Working
Connections Child Care (WCCC) slots.

While these facilities have helped fill the gap, the need for additional spaces is still significant. The Department of
Children, Youth, and Families estimates that an additional 4,054 Early Childhood Education and Assistance Program
(ECEAP) spaces are needed by 2022 to make ECEAP available to all eligible children. While it is too early to measure the
full impact of COVID-19, it is clear the pandemic has worsened this gap in early learning services. As of August 2020,
approximately 18% of child care providers have closed at least temporarily and another 3% have closed
permanently since the start of the pandemic. The state will need to make up this lost ground before it can begin to
make progress on the pre-pandemic gaps in access to care.

Our report offers three recommendations to help ensure that all early learning providers can access Commerce ELF
funds:

    Amend RCW 43.31.575 to reduce the commitment period for ELF grantees receiving $200,000 or more from 20 years
    to 10 years;
    Amend RCW 43.31.577 to allow funding of "land only" projects, while still requiring these providers to construct a
    new facility that increases capacity;
    Continue funding DCYF to provide technical assistance and outreach resources to support early learning providers.


 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                           2
Introduction
State's Goal: Ensure Kindergarten Readiness
In 2015 the Legislature passed the Early Start Act, which laid out a plan to ensure that every child in the state is fully
prepared to enter kindergarten. Buoyed by the data, which show strong positive effects from early learning programs (see
example in the graph below), the Early Start Act made the state's Early Childhood Education and Assistance Program
(ECEAP) an entitlement for every eligible child. The state-funded ECEAP program provides free comprehensive early
learning services for children ages 3 and 4 from families at or below 110% of the federal poverty level. The Act requires
the state to make ECEAP available to all eligible children by the 2022-23 school year. Due to the entitlement mandate in
the Early Start Act, ECEAP has expanded considerably. The number of ECEAP slots for children has increased by
68% (5,467 total new slots) since 2011.

The Department of Children,
Youth, and Families (DCYF)
administers the ECEAP and
Working Connections Child
Care (WCCC) programs.
ECEAP provides
individualized education,
family support, health and
nutrition services for 3 and 4
year olds furthest from
opportunity, while WCCC
helps families with low
incomes pay for child care.
Both programs play a significant role in ensuring kindergarten readiness. To help ensure child care organizations provide
high-quality care, DCYF also instituted a Quality Rating and Improvement System, known as Early Achievers, to assess,
improve, and communicate the level of quality of all ECEAP and WCCC providers.

Need for More Early Learning Facilities Leads to the Creation of the ELF Program
In order to evaluate facility needs related to the entitlement mandate, DCYF conducted the Facility Needs Assessment for
ECEAP Expansion in 2017. The assessment identified insufficient early learning facilities to support ECEAP expansion.
An adequate number of early learning facilities is still needed across the state to meet ECEAP entitlement in 2022-23. The
assessment provided estimates for the statewide need of additional early learning facilities and the cost of establishing an
adequate number of facilities to serve all eligible children in ECEAP entitlement. The report recommended strategies for
investing in facilities that are feasible for current and potential ECEAP providers.

In response to the identified facility needs, the Legislature passed House Bill 1777 in 2017 to create the Early Learning
Facilities (ELF) Program. The ELF Program provides grants and loans to leverage local and private resources to enable
ECEAP contractors and child care providers to expand, remodel, purchase, or construct early learning facilities and
classrooms necessary to support state-funded early learning opportunities for low-income children.

Commerce and DCYF collaboratively started implementation of the ELF program in 2017. Commerce oversees the grant
and loan administration, application process, and monitoring of the ELF grantees. DCYF works with stakeholders to
review licensing standards including, but not limited to, plumbing, fixtures, and playground equipment related to facility
requirements to eliminate potential barriers to licensing while also ensuring the health and safety of children in early
learning programs. DCYF also provides technical assistance to Early Learning Facilities applicants and prospects to
ensure the process is clear and that the eligible organizations meet the licensing standards at preapproval and at project
completion.

 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                   3
Early Learning Facilities Gaps
Large Gap in Services Existed Before COVID-19

                                                                        Despite the recent growth in ECEAP capacity,
                                                                        recent estimates indicate that ECEAP still needs
                                                                        4,054 more slots by fall 2022 (for a statewide
                                                                        total of 18,231) to serve all eligible children who
                                                                        are likely to participate. This gap is a part of the
                                                                        larger child care shortage in the state. The state
                                                                        has approximately 188,000 licensed child care
                                                                        spaces for children 0-13. However, DCYF
                                                                        estimates that 758,945 children under 13 in the
                                                                        state have all available parents working, and thus
                                                                        likely need non-parental care during working
                                                                        hours. While not all of these 758,945 children will
                                                                        need child care, a recent study estimates that over
                                                                        500,000 children in our state need licensed child
                                                                        care but do not have access. Clearly, the need for
                                                                        additional child care and early learning
                                                                        facilities is significant.




COVID-19 Worsened the Gap
COVID-19 has significantly exacerbated this early learning and child care shortage. As of August 2020, 18% of child
care providers have closed at least temporarily and another 3% have closed permanently since the start of the
pandemic. These providers represent 25% of the total capacity in the state. In addition, many more providers have
significantly limited the number of children they serve due to public health guidelines and social distancing requirements.
The map above shows the reduction in child care capacity, measured at the height of the stay-at-home orders.

It is too soon to determine how the pandemic will affect supply and demand in the child care market. However, the child
care market was fragile prior to the pandemic, with more demand for high-quality care than the market could
accommodate. The market lost more ground because of the child care closures related to the pandemic. The state will need
to make up this lost ground before it can begin to make progress on the pre-pandemic gaps in access to care.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                4
Early Learning Facilities Program Overview
                                                                The Early Learning Facilities (ELF) Program provides
                                                                grants to eligible organizations to construct, renovate, or
                                                                acquire property for the purpose of expanding early
                                                                learning capacity.

                                                                The Legislature created the program in 2017 to develop
                                                                additional early learning facilities for low-income children
                                                                to help meet the legal mandate of providing early learning
                                                                to all eligible children by 2022-23.

                                                                Commerce awards ELF grant funds through two
                                                                competitive processes, and it contracts with projects
                                                                specifically designated for funding by the Legislature. One
                                                                competitive process is for K-12 school districts, and the
                                                                other competition is for all other organizations, known as
                                                                "eligible organizations."

The "eligible organizations" funding round includes three separate funding categories: major
construction/renovation, minor renovation, and pre-design planning grants. Major construction/renovation applicants
can apply for up to $800,000 to purchase, construct, or renovate an early learning facility. Minor renovation applicants
can apply for up to $100,000 to conduct minor renovations on a facility. Pre-design applicants can apply for up to $10,000
for professional services to assess the feasibility of developing an early learning facility. School districts, which have a
separate competitive funding round, can submit applications for construction, renovation, or acquisition for up to
$800,000.

The primary goal of the ELF Program is to increase early learning capacity throughout the state and retain capacity at risk
of being lost. Therefore, the ELF Program prioritizes projects that provide a large number, and large percentage of their
total slots, for ECEAP and WCCC children.

All projects funded through the ELF Program must commit to provide early learning services for at least 20 years if the
project receives a grant of at least $200,000. Projects receiving less than $200,000 must commit to provide early learning
services for at least 10 years. Commerce also sets match goals for its competitive funding rounds, and awards more points
to projects that leverage more non-state resources. Overall, the ELF Program has leveraged $88.9 million in non-state
resources through $42.9 million in ELF grants.

In an effort to serve areas of the state most in need of early learning facilities, Commerce awards extra points in its
competitive funding rounds to projects in child care "deserts," which are areas with inadequate child care supply.
Commerce also strives for geographic diversity when selecting projects for funding.

Commerce relies heavily on its state and local partners to administer the ELF Program, both by scoring applications
received during competitive ELF funding rounds, and by serving on the Early Learning Facilities Board. ELF Board staff
include DCYF, the Office of the Superintendent of Public Instruction, the Washington State Housing Finance
Commission, Enterprise Community Partners, the Yakima Valley Community Foundation, and former child care
providers. The ELF Board shares vital early learning information with Commerce staff to help in the administration of the
ELF Program.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                 5
In 2019, the Legislature allocated $200,000 to DCYF to
provide technical assistance to ELF providers. This
technical assistance has included information about
DCYF licensing rules, ECEAP standards, facility
financing options, community partners, the business of
providing child care, site selection and feasibility, and the
design and construction processes. An online technical
assistance resource guide, which includes all of these
facility development topic areas is currently under
development. In a short amount of time, a large number of
ELF grantees and potential applicants have received
technical assistance that has helped them navigate the
early learning facility and licensing process.

In an effort to provide more funding options to early
learning providers, Commerce and the ELF Board
awarded $5 million to Community Development Financial Institutions (CDFI) from the 2017 ELF allocation. These
CDFI organizations include Washington Community Reinvestment Association, Craft3, and Enterprise Community
Partners. Together, these organizations have launched the Washington Early Learning Loan (WELL) Fund, which
provides low-interest revolving loans and grants to early learning providers. They provide a 1:1 match on these state
dollars to ensure investment in early learning facilities from non-state sources. To date, they have committed or closed
on 21 early learning projects with approximately $2.5 million in ELF funding. These awards represent a mixture of
pre-design, acquisition, and construction projects. By the end of 2020 they also plan to award an additional $1 million in
ELF funding to projects needing minor repairs to make their facilities compliant with COVID-19 protocols.


Program Recommendations
While the demand for ELF grants has exceeded the supply, Commerce and the ELF Board have three recommendations to
ensure that all early learning providers can successfully access a facilities grant.

      Reduce the commitment period for projects receiving $200,000 or more from 20 years to 10 years

Early learning providers often tell us that the 20-year commitment period, as required per RCW 43.31.575, is a significant
barrier. The smaller providers especially have noted that many child care businesses stay open for only 10 years due to the
thin operating margins in the child care market. Early learning organizations that serve a high percentage of kids
receiving subsidized child care, such as ECEAP and WCCC, have an especially challenging time staying afloat. Lowering
the commitment period to 10 years for projects receiving $200,000 or more will ensure the program reaches all providers
in the state.

      Allow early learning providers to apply for "land only" projects

The inability to use ELF funds to purchase land (RCW 43.31.577 only allows for 'facility purchases') is a barrier for
projects that want to purchase land and build an early learning facility. Commerce and the ELF Board do not want
providers to purchase land that does not result in an early learning facility. However, including land as an eligible cost,
with the caveat that it must result in increased early learning capacity, will prevent that scenario. It will allow projects to
use state funds for land and other funds for the construction of a new facility.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                     6
      Continue funding DCYF technical assistance and outreach

Commerce, DCYF, and our CDFI partners have heard from early learning providers who feel confident in their ability to
deliver high-quality early learning programs, but lack the expertise needed to be competitive in an ELF funding round.
For example, more outreach is needed to identify potential family home providers who wish to provide additional early
learning services. Many of the family home providers who have applied for ELF funds have not met the basic
requirements of the grant, meaning more work is needed to support successful applications from eligible family home
providers. Language access is also a barrier for providers attempting to apply for ELF funding. Continued technical
assistance to underserved communities will ensure that the ELF Program serves a diverse group of providers. The 2019-
21 capital budget provided funding for DCYF to provide technical assistance to ELF applicants and grantees. Without an
allocation to DCYF in the 2021-23 capital budget, however, the technical assistance aspect of the ELF Program will
expire.


Project Categories and Added Capacity
The five Early Learning Facilities funding categories are listed below, along with the number of spaces funded in each
category. The project locations are displayed by category on the following five pages.

Major Construction and Renovation: 2,853 spaces
    2,381 ECEAP and WCCC spaces
Minor Renovation: 240 spaces
    146 ECEAP and WCCC spaces
Pre-design: 10 projects
    Planning grants do not directly create new capacity
School Districts: 730 spaces
    407 ECEAP and WCCC spaces
Direct Appropriations: 1,393 spaces
    1,019 ECEAP and WCCC spaces


    3,953 ECEAP and WCCC spaces
    5,216 total spaces




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                7
Major Construction and Renovation Projects

                                                                                                                                                                                       Biennium
                                                                                                                                                                                       19-21 Biennium

                                                                                                                                                                                       17-19 Biennium




Major Construction and Renovation Project - Projects awarded during the "eligible organization" funding round. All early learning facilities, with the exception of K-12 school districts, can apply. The maximum
Commerce grant amount is $800,000. Eligible activities include constructing a new early learning facility, renovating an existing facility, or acquiring a facility for early learning.




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                                                          8
Minor Renovation Projects

                                                                                                                                                                                      Biennium
                                                                                                                                                                                      19-21 Biennium

                                                                                                                                                                                      17-19 Biennium




Minor Renovation Project – Projects awarded during the "eligible organization" funding round. All early learning facilities, with the exception of K-12 school districts, can apply. The maximum Commerce grant amount is
$100,000. Funding is for minor renovations to existing early learning facilities.




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                                                           9
Pre-Design Projects

                                                                                                                                                                              Biennium
                                                                                                                                                                              19-21 Biennium

                                                                                                                                                                              17-19 Biennium




Pre-Design Project – Projects awarded during the "eligible organization" funding round. All early learning facilities, with the exception of K-12 school districts, can apply. The maximum Commerce grant amount is $10,000.
Funding is for professional services to assess the feasibility of developing an early learning project.




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                                                           10
School District Projects

                                                                                                                                                                              Biennium
                                                                                                                                                                              19-21 Biennium




School District Project – A facility funded in the school district funding round, which is only open to K-12 school districts. The maximum Commerce grant amount is $800,000. Eligible activities include constructing a new
early learning facility, renovating an existing facility, or acquiring a facility for early learning.




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                                                            11
Direct Appropriation Projects

                                                                                                Biennium
                                                                                                19-21 Biennium

                                                                                                17-19 Biennium




Direct Appropriation Project – An early learning facility funded directly by the Legislature.




  EARLY LEARNING FACILITIES PROGRAM - 2020                                                                       12
All Commerce-Funded Early Learning Facilities
                                                                             New
                                                                             Construction /                           ECEAP                Early
                                 Commerce         Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                   Funding          Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                   Zip
Organization          Biennium   Category         Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address        City        Code

All Blessed                      Major
                                                                                                                                           1620 S
Children Early        19-21      Construction /   $150,000   $200,000        Acquisition      50      0       24      0       6/30/2021                   Tacoma      98405
                                                                                                                                           Adams Street
Learning Center                  Renovation

                                 Major                                                                                                     7930 Rainier
                                                                             New
Bellwether Housing    19-21      Construction /   $800,000   $4,786,458                       138     30      30      60      9/1/2023     Avenue         Seattle     98118
                                                                             Construction
                                 Renovation                                                                                                South

                                 Major
                                                                             Acquisition /                                                 703 N Front
Bertha's Daycare      19-21      Construction /   $350,000   $350,000                         38      38      0       0       6/30/2021                   Yakima      98902
                                                                             Renovation                                                    St
                                 Renovation

                                 Major
Bethel Kids                                                                                                                                132 Kirkland
                      19-21      Construction /   $199,999   $300,000        Renovation       60      0       60      0       10/1/2020                   Chehalis    98532
Learning Center                                                                                                                            Rd
                                 Renovation

                                 Major
Bilingual Learning                                                           New                                                           1110 N
                      19-21      Construction /   $200,000   $400,000                         113     40      53      0       6/30/2021                   Kennewick   99336
Center                                                                       Construction                                                  Edison St
                                 Renovation

                                 Major
                                                                             Acquisition /
Childhaven            19-21      Construction /   $751,924   $6,000,000                       120     120     0       0       09/01/2022   TBD            Seattle     98122
                                                                             Renovation
                                 Renovation

                                 Major                                                                                                     9616 E
Christine's Little                                                           Acquisition /                                                                Spokane
                      19-21      Construction /   $245,000   $245,000                         50      0       0       50      10/1/2020    Broadway                   99206
Athletes                                                                     Renovation                                                                   Valley
                                 Renovation                                                                                                Ave

Community Day                    Major
                                                                             New
School Association,   19-21      Construction /   $800,000   $800,000                         60      0       0       45      12/31/2021   301 S 3rd St   Renton      98057
                                                                             Construction
Launch                           Renovation

                                 Major                                                                                                     11107
Creative Minds
                      19-21      Construction /   $149,307   $214,307        Renovation       62      0       31      31      10/1/2021    Mundy Loss     Buckley     98321
Learning Center
                                 Renovation                                                                                                Rd

                                 Major
Denise Louie                                                                 New                                                           1215 E Fir
                      19-21      Construction /   $800,000   $1,460,000                       59      0       0       59      09/01/2022                  Seattle     98122
Education Center                                                             Construction                                                  Street
                                 Renovation




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                      13
                                                                              New
                                                                              Construction /                           ECEAP                Early
                                  Commerce         Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                    Funding          Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                     Zip
Organization           Biennium   Category         Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address         City         Code

Educational
                                  Major
Opportunities for                                                             Acquisition /
                       19-21      Construction /   $800,000   $3,068,800                       20      20      0       0       6/30/2021    2920 Falk Rd    Vancouver    98661
Children and                                                                  Renovation
                                  Renovation
Families

Gateway Christian                 Major
                                                                              New
Fellowship & Child     19-21      Construction /   $539,250   $1,078,500                       44      0       44      0       9/30/2021    405 S 7th St    Shelton      98584
                                                                              Construction
Care Center                       Renovation

                                  Major                                       Acquisition /
Green Gables           19-21      Construction /   $800,000   $2,395,890      New              57      37      20      0       TBD          TBD             Spokane      99205
                                  Renovation                                  Construction

                                  Major
Joint Pacific County                                                          New
                       19-21      Construction /   $636,600   $1,052,400                       25      0       0       13      6/30/2021    216 Third St    Raymond      98577
Housing Authority                                                             Construction
                                  Renovation

                                  Major
                                                                              New                                                           535 E Main
Learning to Grow       19-21      Construction /   $751,924   $1,450,000                       98      41      57      0       6/30/2021                    Elma         98541
                                                                              Construction                                                  Street
                                  Renovation

                                  Major
Lumen Early                                                                                                                                 120 N Wall
                       19-21      Construction /   $573,000   $823,000        Renovation       62      0       62      0       9/30/2021                    Spokane      99201
Learning Center                                                                                                                             St
                                  Renovation

                                  Major
                                                                                                                                            2332 Lummi
Lummi Nation           19-21      Construction /   $800,000   $1,066,667      Renovation       30      10      0       20      TBD                          Bellingham   98226
                                                                                                                                            View Dr
                                  Renovation

Olympic                           Major                                                                                                     Corner of 7th
                                                                              New                                                                           Port
Community Action       19-21      Construction /   $511,777   $701,271                         15      0       15      0       9/30/2022    and                          98368
                                                                              Construction                                                                  Townsend
Programs                          Renovation                                                                                                Hendricks St

Pateros Treehouse                 Major                                                                                                     128 N
                                                                              Acquisition /
Early Education        19-21      Construction /   $540,000   $720,000                         52      0       15      0       06/01/2021   Independence    Pateros      98836
                                                                              Renovation
Organization                      Renovation                                                                                                Street

                                  Major                                                                                                     4455 S.
Primm ABC Child
                       19-21      Construction /   $800,000   $3,032,427      Renovation       58      0       0       44      12/31/2020   Brandon         Seattle      98118
Care Center
                                  Renovation                                                                                                Street

                                  Major
Rainbow River                                                                 New                                                           7208 W
                       19-21      Construction /   $560,000   $800,000                         104     0       30      30      12/31/2020                   Pasco        99301
Childcare                                                                     Construction                                                  Argent Rd
                                  Renovation




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                         14
                                                                            New
                                                                            Construction /                           ECEAP                Early
                                Commerce         Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                  Funding          Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                    Zip
Organization         Biennium   Category         Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address        City         Code

Seattle Chinatown
International
                                Major                                                                                                     1200 12th
District                                                                    New
                     19-21      Construction /   $800,000   $800,000                         128     0       50      0       09/01/2023   Avenue         Seattle      98144
Preservation and                                                            Construction
                                Renovation                                                                                                South
Development
Authority

                                Major
Skagit Valley                                                               Acquisition /                                                 208 N Skagit
                     19-21      Construction /   $465,000   $581,250                         14      0       0       14      6/30/2022                   Burlington   98233
Family YMCA                                                                 Renovation                                                    St
                                Renovation

Smokey Point                    Major
                                                                            Acquisition /                                                 17121 28th
Daycare and Early    19-21      Construction /   $800,000   $2,317,150                       47      0       0       47      3/1/2021                    Marysville   98271
                                                                            Renovation                                                    Dr NE
Learning Center                 Renovation

Tiny Tots                       Major                                                                                                     3939 South
                                                                            New
Development          19-21      Construction /   $766,605   $3,241,605                       84      30      30      0       9/30/2021    Othello St.    Seattle      98118
                                                                            Construction
Center                          Renovation                                                                                                Building C

                                Major
Triumph Treatment                                                           New                                                           604 Superior
                     19-21      Construction /   $800,000   $4,515,600                       18      0       0       18      3/31/2021                   Yakima       98902
Services                                                                    Construction                                                  Lane Unit E
                                Renovation

                                Major
University Temple                                                           Acquisition /
                     19-21      Construction /   $751,925   $1,780,000                       137     0       74      0       12/31/2020   TBD            Seattle      98105
Children's School                                                           Renovation
                                Renovation

                                Major
                                                                            New                                                           19630 20th
Vision House         19-21      Construction /   $500,000   $1,133,361                       70      0       30      40      TBD                         Shoreline    98155
                                                                            Construction                                                  Avenue NE
                                Renovation

                                Major
West African                                                                                                                              6322 44th
                     19-21      Construction /   $316,086   $421,449        Renovation       39      0       39      0       12/31/2020                  Seattle      98118
Community Council                                                                                                                         Ave. South
                                Renovation

                                Major                                       Acquisition /                                                 2421
Whatcom Family
                     19-21      Construction /   $800,000   $4,586,223      New              24      0       5       0       08/01/2022   Rimland        Bellingham   98226
YMCA
                                Renovation                                  Construction                                                  Drive

                                Major
White River                                                                                                                               731 Watson
                     19-21      Construction /   $800,000   $2,500,000      Renovation       59      0       54      0       TBD                         Enumclaw     98022
Children's Academy                                                                                                                        St. N
                                Renovation

                                Major                                                                                                     2544
YMCA of Grays                                                               Acquisition /
                     19-21      Construction /   $800,000   $1,484,396                       53      13      25      0       TBD          Simpson        Hoquiam      98550
Harbor                                                                      Renovation
                                Renovation                                                                                                Avenue



EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                      15
                                                                             New
                                                                             Construction /                           ECEAP                Early
                                 Commerce         Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                   Funding          Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                      Zip
Organization          Biennium   Category         Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address          City         Code

                                                                                                                                           2600 SW
                                 Major
YMCA of Greater                                                                                                                            Barton Street,
                      19-21      Construction /   $800,000   $2,090,000      Renovation       124     0       124     0       6/30/2021                     Seattle      98126
Seattle                                                                                                                                    Suite N1, N2,
                                 Renovation
                                                                                                                                           N5

                                 Major                                       Renovation /
Youth and Family                                                                                                                           1107 S. 4th
                      19-21      Construction /   $650,000   $985,000        New              34      17      0       17      12/31/2020                    Kelso        98626
Link                                                                                                                                       Ave
                                 Renovation                                  Construction

                                 Major
                                                                             New                                                           600 Centralia
Centralia College     17-19      Construction /   $800,000   $1,100,341                       99      0       99      0       9/30/2019                     Centralia    98531
                                                                             Construction                                                  College Blvd
                                 Renovation

Chelan Douglas                   Major
                                                                             New                                                           1305 Kittitas
Child Services        17-19      Construction /   $800,000   $1,208,000                       36      36      0       0       9/9/2019                      Wenatchee    98802
                                                                             Construction                                                  Street
Association                      Renovation

Family Support                   Major
                                                                                                                                           3535 7th Ave
Center of South       17-19      Construction /   $800,000   $1,382,000      Renovation       96      9       20      0       6/30/2021                     Olympia      98502
                                                                                                                                           SW
Sound                            Renovation

                                                                                                                                           12808 SE
                                 Major
Learning Land-Kent                                                                                                                         Kent-
                      17-19      Construction /   $500,000   $1,105,000      Acquisition      80      15      55      2       10/1/2019                     Kent         98030
Campus                                                                                                                                     Kangley
                                 Renovation
                                                                                                                                           Road

                                 Major
                                                                             New                                                           1701
Lydia Place           17-19      Construction /   $199,999   $3,900,000                       32      0       25      0       2/1/2022                      Bellingham   98229
                                                                             Construction                                                  Gladstone St
                                 Renovation

Martin Luther King               Major
                                                                                                                                           500 S. Stone
Jr. Family Outreach   17-19      Construction /   $175,000   $675,000        Renovation       20      20      0       0       1/31/2020                     Spokane      99202
                                                                                                                                           St.
Center                           Renovation

Multicultural Child              Major
                                                                             New                                                           2102 S 23rd
and Family Hope       17-19      Construction /   $800,000   $5,000,000                       175     0       0       175     07/01/2021                    Tacoma       98405
                                                                             Construction                                                  St
Center                           Renovation

                                 Major
Skagit Valley                                                                New                                                           2011 N La
                      17-19      Construction /   $800,000   $2,914,600                       45      15      30      0       6/1/2022                      Mt Vernon    98273
College                                                                      Construction                                                  Venture Rd
                                 Renovation

                                 Major                                                                                                     Corner of
YMCA of Greater                                                              New
                      17-19      Construction /   $729,513   $4,022,908                       124     0       0       124     6/30/2021    Turing St and    Redmond      98052
Seattle                                                                      Construction
                                 Renovation                                                                                                156th Ave




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                         16
                                                                        New
                                                                        Construction /                           ECEAP                Early
                                Commerce     Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                  Funding      Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                     Zip
Organization         Biennium   Category     Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address        City          Code

Belinda Boston,                 Minor                                                                                                 602 SW
                     19-21                   $100,000   $125,000        Renovation       12      12      0       0       4/1/2021                    Renton        98057
Pinwheel Preschool              Renovation                                                                                            Langston Rd

First Church of                 Minor                                                                                                 928 Sturm
                     19-21                   $58,909    $98,909         Renovation       20      0       11      0       10/15/2020                  Walla Walla   99362
God, The ARK                    Renovation                                                                                            Ave

Kaleidoscope
                                Minor                                                                                                 1292 North
Preschool & Child    19-21                   $100,000   $141,365        Renovation       12      0       0       12      1/1/2021                    Eastsound     98245
                                Renovation                                                                                            Beach Road
Care Center

Little Giggles                  Minor                                                                                                 11220 8th St
                     19-21                   $40,000    $55,359         Renovation       8       0       8       0       6/30/2021                   Edgewood      98372
Daycare                         Renovation                                                                                            E

The Children's                                                                                                                        5251 Sand
                                Minor
Center at Burke      19-21                   $31,000    $47,000         Renovation       9       0       9       0       6/30/2021    Point Way      Seattle       98105
                                Renovation
Gilman Gardens                                                                                                                        NE Bldg. 5

Transitional
                                Minor                                                                                                 3128 N
Programs for         19-21                   $62,704    $83,720         Renovation       21      10      5       0       6/30/2021                   Spokane       99205
                                Renovation                                                                                            Hemlock St
Women

                                                                                                                                      450
                                Minor
Vision House         19-21                   $35,250    $47,000         Renovation       84      0       25      0       12/31/2020   Bremerton      Renton        98059
                                Renovation
                                                                                                                                      Avenue NE

                                Minor                                                                                                 1306 W
Wonder Kids          19-21                   $71,818    $95,757         Renovation       40      0       0       20      10/1/2021                   Yakima        98902
                                Renovation                                                                                            Mead Ave

                                                                                                                                      3581 SE Old
Squaxin Island                  Minor
                     17-19                   $11,608    $97,300         Renovation       34      28      6       0       10/1/2018    Olympic        Shelton       98584
Tribe                           Renovation
                                                                                                                                      Highway


Childhaven           19-21      Pre-Design   $10,000    $69,000         Pre-Design       N/A     N/A     N/A     N/A     N/A          TBD            TBD           98168


Community Child                                                                                                                       1410 NE
                     19-21      Pre-Design   $10,000    $40,000         Pre-Design       N/A     N/A     N/A     N/A     N/A                         Pullman       99163
Care Center                                                                                                                           Stadium Way

Everett Community                                                                                                                     820 Waverly
                     19-21      Pre-Design   $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A                         Everett       98201
College                                                                                                                               Avenue

Greater Trinity                                                                                                                       11229 4th
                     19-21      Pre-Design   $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A                         Everett       98204
Academy                                                                                                                               Ave W




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                   17
                                                                              New
                                                                              Construction /                           ECEAP                Early
                                 Commerce          Commerce                   Renovation /             ECEAP   WCCC    or      Facility     Learning
Early Learning                   Funding           Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening      Facility                       Zip
Organization          Biennium   Category          Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date         Address         City           Code

Living Well Kent                                                                                                                            23401 104th
                      19-21      Pre-Design        $10,000    $17,500         Pre-Design       N/A     N/A     N/A     N/A     N/A                          Kent           98031
Collaborative                                                                                                                               Ave SE

                                                                                                                                            3028
Bellingham
                      17-19      Pre-Design        $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A          Lindbergh       Bellingham     98225
Technical College
                                                                                                                                            Avenue

Kalispel Indian
Community of the                                                                                                                            1821 N.
                      17-19      Pre-Design        $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A                          Usk            99180
Kalispel                                                                                                                                    LeClerc
Reservation

Okanogan County
Child Development     17-19      Pre-Design        $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A          TBD             Tonasket       98855
Association

                                                                                                                                            804 W.
Opportunity
                      17-19      Pre-Design        $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A          Bakerview       Bellingham     98226
Council
                                                                                                                                            Rd.

Tulalip Tribes of                                                                                                                           7607 Totem
                      17-19      Pre-Design        $10,000    $10,000         Pre-Design       N/A     N/A     N/A     N/A     N/A                          Tulalip        98271
Washington                                                                                                                                  Beach Road

Ellensburg School                                                                                                                           1701 N. Cora
                      19-21      School District   $217,463   $869,853        Renovation       60      18      0       18      09/01/2021                   Ellensburg     98926
District                                                                                                                                    Avenue

Kettle Falls School                                                                                                                         735 South
                      19-21      School District   $383,150   $463,850        Renovation       35      8       0       8       10/1/2018                    Kettle Falls   99141
District                                                                                                                                    Meyers Street

                                                                                                                                            6130
Lake Quinault                                                                 New                                                                           Amanda
                      19-21      School District   $349,200   $447,000                         39      24      15      0       1/25/2021    Highway 101                    98526
School District                                                               Construction                                                                  Park
                                                                                                                                            North

Manson School                                                                 New                                                           950 Totem Pl
                      19-21      School District   $388,000   $1,605,776                       8       8       0       0       4/1/2021                     Manson         98831
District                                                                      Construction                                                  Rd

                                                                              Acquisition /                                                 1920
North Thurston
                      19-21      School District   $314,280   $2,589,600      New              160     72      0       0       11/2/2020    Abernethy       Lacey          98516
Public Schools
                                                                              Construction                                                  Rd NE

Richland School                                                                                                                             1525 Hunt
                      19-21      School District   $776,000   $2,292,118      Renovation       80      0       0       0       TBD                          Richland       99354
District                                                                                                                                    Ave

Toppenish School                                                                                                                            306 Bolin
                      19-21      School District   $107,670   $555,612        Renovation       248     127     0       59      10/12/2020                   Toppenish      98948
District                                                                                                                                    Drive



EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                           18
                                                                               New
                                                                               Construction /                           ECEAP               Early
                                Commerce          Commerce                     Renovation /             ECEAP   WCCC    or      Facility    Learning
Early Learning                  Funding           Grant        Total Project   Acquisition /    Total   Only    Only    WCCC    Opening     Facility                     Zip
Organization         Biennium   Category          Amount       Cost            Pre-Design       Slots   Slots   Slots   Slots   Date        Address         City         Code

Tukwila School                                                                                                                              4640 S. 144th
                     19-21      School District   $190,120     $784,800        Renovation       100     0       50      0       9/1/2018                    Tukwila      98168
District                                                                                                                                    St

Anacortes Family                Direct                                         New
                     19-21                        $299,730     $4,400,000                       25      0       0       25      9/30/2021   1019 26th St    Anacortes    98221
Center                          Appropriation                                  Construction

                                                                                                                                            6600
                                Direct
Bellwether Housing   19-21                        $1,455,000   $4,631,747      Acquisition      68      0       38      0       9/31/2022   Roosevelt       Seattle      98115
                                Appropriation
                                                                                                                                            Way NE

Boys & Girls Clubs              Direct                                         Acquisition /
                     19-21                        $97,000      $97,000                          50      0       50      0       6/30/2021   TBD             Mt Vernon    98273
of Skagit County                Appropriation                                  Renovation

                                                                                                                                            4085 Home
                                                                                                                                            Rd; 2000
Boys & Girls Clubs              Direct
                     19-21                        $749,810     $949,810        Renovation       530     0       0       530     TBD         Sunset Dr;      Bellingham   98226
of Whatcom County               Appropriation
                                                                                                                                            1635 Main St
                                                                                                                                            (Ferndale)

Family Support
                                Direct                                                                                                      3535 7th Ave
Center of South      19-21                        $582,000     $1,382,000      Renovation       96      9       20      0       6/30/2021                   Olympia      98502
                                Appropriation                                                                                               SW
Sound

Issaquah School                 Direct                                                                                                      565 NW
                     19-21                        $150,350     $150,350        Renovation       175     113     0       0       6/30/2021                   Issaquah     98027
District                        Appropriation                                                                                               Holly St

Lewis County                    Direct                                         New
                     19-21                        $2,950,000   $2,950,000                       130     0       0       0       1/1/2022    TBD             TBD          98532
United Way                      Appropriation                                  Construction

Monroe Boys &                   Direct                                                                                                      806 W Main
                     19-21                        $970,000     $970,000        Renovation       35      0       0       35      9/30/2021                   Monroe       98296
Girls Club                      Appropriation                                                                                               St

Opportunity                     Direct                                                                                                      3950
                     19-21                        $50,440      $202,624        Renovation       0       0       0       0       10/1/2020                   Bellingham   98225
Council                         Appropriation                                                                                               Hammer Dr

                                Direct                                         New                                                          1525 E
Proclaim Liberty     19-21                        $970,000     $3,170,516                       30      0       0       30      3/1/2021                    Spokane      99202
                                Appropriation                                  Construction                                                 Hartson Ave

Samish Indian                   Direct
                     19-21                        $264,810     $464,810        Purchase         83      0       0       0       6/30/2021   1618 D Ave      Anacortes    98221
Nation                          Appropriation

Triumph Treatment               Direct                                         New                                                          604 Superior
                     19-21                        $291,000     $4,515,600                       18      0       0       18      3/31/2021                   Yakima       98902
Services                        Appropriation                                  Construction                                                 Lane Unit E




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                         19
                                                                          New
                                                                          Construction /                           ECEAP               Early
                               Commerce        Commerce                   Renovation /             ECEAP   WCCC    or      Facility    Learning
Early Learning                 Funding         Grant      Total Project   Acquisition /    Total   Only    Only    WCCC    Opening     Facility                  Zip
Organization        Biennium   Category        Amount     Cost            Pre-Design       Slots   Slots   Slots   Slots   Date        Address       City        Code

Discover!                      Direct                                     New
                    17-19                      $999,100   $2,080,000                       0       0       0       0       TBD         TBD           Chehalis    98532
Children's Museum              Appropriation                              Construction

Franklin Pierce                Direct                                     New                                                          12223 A
                    17-19                      $950,600   $3,404,000                       108     52      0       20      8/24/2020                 Tacoma      98444
School District                Appropriation                              Construction                                                 Street

                                                                                                                                       3791 W
Kitsap Community               Direct                                     New
                    17-19                      $450,080   $1,800,000                       34      34      0       0       3/1/2017    Loxie Eagan   Bremerton   98312
Resources                      Appropriation                              Construction
                                                                                                                                       Blvd

Pasco School                   Direct                                                                                                  1315 North
                    17-19                      $999,100   $6,032,840      Renovation       60      60      0       0       1/3/2018                  Pasco       99301
District                       Appropriation                                                                                           7th Avenue

Refuge Women's                                                                                                                         4008 Martin
                               Direct                                     New
Alliance Early      17-19                      $970,000   $5,396,493                       65      8       8       16      6/3/2019    Luther King   Seattle     98108
                               Appropriation                              Construction
Learning Facility                                                                                                                      Jr. Way S




EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                                                                 20
Bibliography
Early Start Act | Washington State Department of Children, Youth, and Families. Retrieved from:
https://www.dcyf.wa.gov/about/government-community/legislative-federal-relations/early-start-act

The Early Start Act 2018 Annual Report | Washington State Department of Children, Youth, and Families. (2019).
Retrieved from: https://www.dcyf.wa.gov/sites/default/files/pdf/reports/2018_Early_Start_Act_Report.pdf

Washington State Child Care Industry Assessment | Washington State Department of Commerce. (2020). Retrieved from:
https://www.commerce.wa.gov/wp-content/uploads/2020/08/Child-Care-Collaborative-Task-Force-Industry-Assessment-
Report.pdf

Working Connections Child Care | Washington State Department of Children, Youth, and Families. Retrieved from:
https://dcyf.wa.gov/services/earlylearning-childcare/getting-help/wccc.

Early Childhood Education and Assistance Program | Washington State Department of Children, Youth, and Families.
Retrieved from: https://www.dcyf.wa.gov/services/early-learning-providers/eceap.

Facilities Needs Assessment for ECEAP Expansion | Washington State Department of Early Learning. Retrieved from:
https://www.dcyf.wa.gov/sites/default/files/pdf/eceap/Facility_Needs_Assessment_for_ECEAP_Expansion_September_2
016_0.pdf.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                          21
Appendix A - Administering a capital budget
appropriation
Overview:
Agencies administering capital budget appropriations must adhere to many state laws, rules, and guidelines. Many
projects must also meet additional state and/or federal statutory requirements. In addition, many capital budget
appropriations require reports to the legislature and other program specific administration. This document describes only
the general requirements for administering a capital budget appropriation


Table 1. Select Administrative and Statutory Requirements
       General Administration                             Additional Statutory Requirements
                                                          Statutory Requirements
       OFM/Capital Budget Requirements
                                                          Historic Preservation & Tribal Consultation
       Allowable Costs
                                                          Executive Order 05-05
       Staffing costs up to 3%
                                                          Federal Section 106
       Program Costs
                                                          Environmental
       Financing
                                                          SEPA
       Taxable/Non-taxable
                                                          NEPA
       Reappropriations
                                                          Growth Management
       Land acquisition/Site Control
                                                          Urban growth area
       Real estate transactions
                                                          Critical Areas
       Deeds of Trust
                                                          Local project review
       Ownership or 15-yr lease - intended use
                                                          Wage Determination
       Technical Assistance
                                                          Prevailing Wage
       Contracting
                                                          Davis Bacon (federal)
       Attorney General Review
                                                          Energy
       Audits
                                                          LEED Standards

Commerce's Community Capital Facilities
                                                                           The Community Capital Facilities Unit is a key
                                                                           ingredient in Commerce's overall mission to
                                                                           make communities stronger. In the 2019-21
                                                                           biennium, the legislature appropriated over
                                                                           $247 million dollars to Commerce across the
                                                                           five funds managed in this program. The
                                                                           program used 14 staff to meet the
                                                                           administrative requirements of 494 projects. In
                                                                           addition, staff manages an additional 200 to
                                                                           400 projects in re-appropriations. Total dollar
                                                                           value of projects managed by staff in any one
                                                                           biennium can therefore be $650 to $850 million
                                                                           dollars.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                             22
Keys to successful projects . . . A few examples demonstrating why
good project administration is essential
Site Control
Project grantees must either own the impacted property or have a long-term lease
A grantee received a direct appropriation to construct a monument on land it did not control. All capital budget
appropriations over $250,000 require the state to maintain a security interest by placing the state on the deed or creating a
leasehold deed of trust. In this project, the grantee did not want to enter into a lease agreement. Commerce worked with
legislative budget staff and OFM to transfer ownership of the project to the local government that owned the project site.

Executive Order 05-05
All capital construction projects and land acquisition projects require cultural and historic review
A community received a capital budget appropriation to renovate a building. Later, the community decided to construct a
facility next to the planned renovation. This triggered a new requirement to conduct a cultural resources review with the
relevant tribal government. Commerce staff continued to support the renovation while supporting the new construction
with assistance on Governors Executive Order 05-05 Cultural Review.

Growth Management Act (GMA)
Certain state funded projects require the local government to be in compliance under the Growth Management
Act
A local government received a legislative proviso from the Public Works Assistance Account. Staff noticed that the local
government was out of compliance with certain provisions of the Growth Management Act and coordinated an extension
to allow the project to move forward.

Final Considerations
The most common delay of capital budget appropriations is the need to have all non-state funds raised before the project
can even begin. Coordination and consultation with affected tribes is another milestone that can take time. Early
coordination is key.

Each project must meet also be managed in accordance with OFM and Capital budget and accounting requirements.
Commerce staff have extensive professional background in project and contract management and receive annual training
to manage capital budget appropriations efficiently and effectively.




 EARLY LEARNING FACILITIES PROGRAM - 2020                                                                                23


File and source

File
2020_early-learning-facilities-report-94f6da3f-bdd6-4027-8d10-307e95fffe05.pdf
Size
1,218,122 bytes
SHA-256
39b728cca5fde27c15154416d57f9df1d439c8f1d1cdf63b994bb8cdae007ff2
Our copy
2020_early-learning-facilities-report-94f6da3f-bdd6-4027-8d10-307e95fffe05.pdf
Original
app.leg.wa.gov
Back to top