Full text

Department of Labor and Workforce Development
Unemployment Systems - Information Technology Operations

July 1, 2019 to May 31, 2022

David J. Kaschak
State Auditor

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Table of Contents

Scope ..........................................................................................................................
1

Objectives ..................................................................................................................
1

Methodology ..............................................................................................................
1

Data Reliability ..........................................................................................................
2

Conclusions ................................................................................................................
2

Background ................................................................................................................
3

Observation

Information Technology Service Management .............................................
5

Findings and Recommendations

Change Control ..............................................................................................
7

Logical Access – Authentication ...................................................................
9

Contingency Planning ....................................................................................
11

Appendix

Methodologies to Achieve Audit Objectives .................................................
13

Auditee Response.......................................................................................................
15

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 1

Scope

We have completed an audit of the Department of Labor and Workforce Development
(department), Unemployment Systems – Information Technology Operations, for the period July
1, 2019 to May 31, 2022. The scope of our audit included the department’s information
technology (IT) service management, change control, logical access, and contingency planning
of the unemployment insurance claims processing environment. Where possible, we focused on
these areas as they related to the surge in unemployment claims as a result of the COVID-19
pandemic. Our audit addressed the IT environment and IT service management only.

Objectives

The objective of our audit was to determine if the department maintained an adequate information
technology service management level during the increase in claims processing related to the
COVID-19 pandemic. An additional objective was to determine if the selected general controls
were working properly to ensure the confidentiality, integrity, and availability of the applications
and data in the claims processing environment.

This audit was conducted pursuant to the State Auditor's responsibilities as set forth in Article
VII, Section I, Paragraph 6 of the State Constitution and Title 52 of the New Jersey Statutes.

Methodology

Our audit was conducted in accordance with Government Auditing Standards, issued by the
Comptroller General of the United States. Those standards require that we plan and perform the
audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and
conclusions based on our audit objectives. We believe the evidence obtained provides a
reasonable basis for our findings and conclusions based on our audit objectives. Additional
guidance for the conduct of the audit was taken from the Federal Information System Controls
Audit Manual (FISCAM), published by the U.S. Government Accountability Office; the
Statewide Information Security Manual (SISM), published by the New Jersey Office of
Homeland Security and Preparedness; and the Information Technology Infrastructure Library
(ITIL), published by AXELOS Global Best Practice.  These documents were used as the criteria
against which controls and performance were measured.

In preparation for our testing, we studied legislation, administrative code, department and
statewide policies and procedures, as well as industry standards and best practices. Provisions we
considered significant were documented, and compliance was verified by interviews of key
personnel, review of department documentation, analysis of department data, and other tests we
determined necessary to achieve our audit objectives. Additional detail regarding our
methodology and work performed can be found in the Appendix, as well as in the findings and
the observation when testing resulted in a reportable condition.

A non-statistical sampling approach was used in situations where the entire population was not

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 2

tested. Our samples were designed to provide conclusions on our audit objectives as well as on
internal controls and compliance. Sample populations were identified, and items were
judgmentally selected for testing. Because we used a non-statistical sampling approach for our
tests, we cannot project the results to the respective populations.

Data Reliability

We assessed the reliability of computer-processed data in the Access Control Facility (ACF2) by
accessing and extracting the data directly from the source mainframe. We assessed the reliability
of data related to remote access for department users by requesting the data for two separate dates
and comparing the record set for consistency and reasonableness. We assessed the reliability of
various log data provided to us through discussions with department management concerning
selected records. We determined that the data was sufficiently reliable for the purposes of this
report. Certain other data in our report were used to provide background information. Data that
we used for this purpose were obtained from the best available sources. Government Auditing
Standards do not require us to complete a data reliability assessment for data used for this
purpose.

Conclusions

We found that the department provided a sufficient information technology service management
level to claimants to meet the increased needs in the unemployment insurance (UI) claims
processing environment, and we found no evidence that delays in the processing of initial claims
or recertifications were caused by deficiencies in the information technology structure or
operations. This is presented as an observation before the audit findings in the report.

We also found that, overall, the department has controls over logical access and contingency
planning in place to ensure the confidentiality, integrity, and availability of the processing
environment for UI claims, though we noted areas for improvement in controls and processes that
are needed. In the area of change control, there was a breakdown in the controls during the audit
period; however, our additional audit work found no instances where this caused errors or delays
in the processing of claims.

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 3

Background

The filing of a new unemployment claim and the recertification (continuation) of an existing
unemployment claim are both achieved through processes that include multiple technological
components working together. For security reasons, we are not providing details about these
components or their specific controls and connections. However, in order to understand the
overall processing of unemployment transactions, the diagram below demonstrates the basic
business process flow for new unemployment claims.

Claims Process (New Claims)

            Claimants             UI Web/IVR Application             RCC Application       LOOPS-Mainframe
                  A                                     B                                        C                                    D

A. Claimants access the UI filing processing environment through the web application, the
telephone (IVR) system, or direct interaction with a department employee. The
department has controls in place to restrict access to the web application by unauthorized
users.

B. When using the web or IVR, the claimant either creates an account or logs in to their
existing account for the application, and the account is authenticated. Once this is
successful, the claimant can file a new claim, recertify a previous claim, or inquire on the
status of a previously filed claim.

C. Once the claimant’s actions are completed, if the claim is new, the claim information is
stored in the department’s RCC system after going through various edits and controls.
According to the department, all new claims go through the RCC system before going to
the mainframe Local Office Online Payment System (LOOPS). If the new claim requires
additional intervention by a department employee, it is in the RCC system that the
intervention takes place and any initial additions or corrections are done. The RCC system
records the date the claim was received by it as well as the date the claim was moved to
LOOPS.

D. Once the claim is completed in the RCC system, it is moved to the LOOPS mainframe
for processing. If a claim requires no intervention, it is typically moved to the LOOPS at
the end of the same day it is filed. If it requires intervention, once the appropriate action
has been taken and the claim is considered completed, it is moved to the LOOPS at the
end of that day. If for any reason the claim is not accepted into the LOOPS, the claim is

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 4

labeled with the reason for the rejection in the RCC system, and the claim is addressed by
an authorized department employee.

The scope of our audit included the period before the pandemic through the initial claims surge
related to the pandemic and into the post-pandemic surge period. For comparison purposes, below
are the New Jersey claims volume in eight-month increments, according to the U.S. Department
of Labor:

Time Period
Initial Claims Filed
Continued Claims
(Recertifications)
Total Transactions
6/30/2019 to 2/29/2020
332,335
3,200,108
3,532,443
3/1/2020 to 10/31/2020
1,744,339
14,241,103
15,985,442
11/1/2020 to 7/3/2021
495,872
4,644,128
5,140,000
7/4/2021 to 3/5/2022
326,260
3,633,217
3,959,477
Total Transactions
2,898,806
25,718,556
28,617,362

The pandemic caused a 425 percent increase in the number of initials claims filed (332,335 to
1,744,339) and a 345 percent increase in recertifications (3,200,108 to 14,241,103) from the eight
months prior to the pandemic to the first eight months of it. In addition, various new federal and
state mandates created an increased need for changes to the LOOPS application. Below is the
number of LOOPS program changes between July 1, 2019 and February 28, 2022 in eight-month
increments:

Time Period
LOOPS Program Changes
7/1/2019 to 2/29/2020
30
3/1/2020 to 10/31/2020
120
11/1/2020 to 6/30/2021
76
7/1/2021 to 2/28/2022
70
Total
296

Increases of that size put an additional burden on not only the technological infrastructure of the
unemployment application but also on the department’s information technology staff to manage
the claims processing environment and its components.

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 5
Observation

Information Technology Service Management

Entities create value by providing services to their customers in an effective and efficient manner.
Information technology service management is a comprehensive program that allows an
organization to ensure that it provides services to its customers with confidentiality, availability,
and integrity of the processing environment. Aspects of service management include availability,
business analysis, capacity and performance management, incident management, and monitoring
and event management.

The U.S. Department of Labor reported that New Jersey had approximately 1.0 million new
unemployment claims between March 1, 2020 and May 2, 2020 and approximately 3.0 million
claims recertifications during this same period for a total of 4.0 million transactions entering the
UI processing environment during that time. This represents a 993 percent increase in new claims
and a 201 percent increase in recertifications from the previous period of the same length. Based
on this increase, we used the period March 1, 2020 through May 1, 2020 as the period to evaluate
the information technology service management level of the department during the initial
pandemic surge in unemployment insurance claims. We considered three major questions when
evaluating the department’s information technology service management:

1. Did the department have a comprehensive understanding of its claims processing
environment prior to the pandemic?

We documented the department’s understanding of the processing environment for
unemployment insurance claims from the initiation of the transactions through the
processing of the claims in the LOOPS system. We found that the department had a
comprehensive understanding of its processing environment. Although we did note some
deficiencies in the disaster recovery and business continuity plans as noted in a later
finding, we also noted that no outage of any component of the processing environment
lasted long enough to require either of these plans to be initiated; therefore, these
deficiencies did not have an impact on the processing environment.

2. Did the department analyze and plan for the potential increase in claims volume, identify
potential weaknesses in its environment that could impact its ability to deal with the
increase, and adjust the environment to address weaknesses identified?

The department stated that it did not do any dedicated planning or make configuration
adjustments in preparation for the pandemic surge in claims but rather took a reactive
approach to changing the web portion of the processing environment as the monitoring
mechanisms in place informed the department of potential issues. There were 29 changes
made to various configuration settings in this aspect of the processing environment
between March 17, 2020 and April 14, 2020 to address issues with performance. We
identified that eleven of these changes were increases to the capacity of various

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 6
components of the web processing application and could have potentially been done prior
to the pandemic surge; however, all of the issues were addressed and completed over a
six-day period during the initial weeks of the surge and caused no significant delays to
claims processing. In the mainframe portion of the processing environment, there was a
performance analysis and processor upgrade performed in April 2020 to prevent delays
in claims processing in that environment.

The other project that took place during this time to increase security and provide other
processing benefits was moving components of the UI processing environment behind a
web application firewall. Most of those components were moved in mid-March 2020. In
addition, to help address the increased volume, the department enhanced the filing
application to enforce required time periods for users to file for new or recertify existing
unemployment benefits. The department previously provided a schedule for claimants to
log on to the system based on their social security number. However, claimants did not
always follow the suggested schedule and continued to attempt to access the application
outside of their suggested time period. This enhancement enabled the department to
enforce the schedule and deny access to users who were not within their designated time
period. An error message was returned to users who attempted to access the system
outside of their assigned time period.

3. Did the department monitor the environment and respond effectively to issues that arose
to ensure that processing of customer transactions was not excessively delayed?

We reviewed system activity logs and other monitoring documentation related to the
period March 1, 2020 through May 1, 2020 for the unemployment insurance processing
environment to determine if issues occurred that would have affected the processing of
claims. During this 62-day period, there were 12 incidents over 8 of the days that may
have affected a customer’s ability to file or recertify an unemployment claim, with the
average incident lasting 84 minutes. Assuming a window of 7 a.m. to midnight each day
during the period for the application to be available for filing and recertification while
providing the department time for overnight maintenance and upgrades of components,
we calculated that the total outage time caused by these incidents accounted for a
maximum of 1.6 percent of the available filing/recertification time during the period
reviewed. This percentage could be smaller when factoring in days when the maintenance
window was not needed. In addition, ten of the twelve incidents were related to
components of the unemployment processing environment that were migrated to other
devices by May 2020.

The other aspect of unemployment claims processing at the department is the mainframe
programs that process LOOPS data overnight. Our analysis of the mainframe error logs
for the period March 1, 2020 through May 1, 2020 identified 67 incidents affecting the
successful completion of 121 individual programs during that time. The average recovery
time for these issues was approximately seven hours, which is within the overnight
window when the LOOPS is offline for processing. Therefore, most incidents were
resolved the same night. Eight of the incidents affecting 29 programs did take more than

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 7
24 hours to resolve, one of which took longer than 48 hours to resolve. Further analysis
found that four of the eight incidents taking longer than 24 hours to resolve occurred on
a single day, and the one incident taking longer than 48 hours affected a program that was
not related to claims processing.

We identified 1,096 jobs on the daily program schedule for the LOOPS, which calculates
to approximately 68,000 total daily mainframe programs run during the 62-day review
period. Therefore, the 121 affected programs represented only 0.18 percent of the total
daily programs run during the period, of which the programs that took more than 24 hours
to resolve represented only 0.04 percent of the total programs. Based on this analysis, we
found no evidence that there was an increased number of errors in mainframe program
processing caused by the increase in claims from the pandemic, and we found no evidence
that the errors that did occur in the mainframe processing during the review period caused
any significant delay in the processing of claims by the LOOPS.



Findings

Change Control

The department had deficiencies in its change control process.

According to the Statewide Information Security Manual (SISM), all technology changes to
production environments must follow a standard process to reduce the risk associated with the
change. Agencies should involve key business stakeholders in the change process to ensure
changes are appropriately tested, validated, and documented before implementing any change on
a production system. Change control consists of a wide range of activities, including the
establishment of a formal change management process; proper authorization and approval of all
changes; development, documentation, and approval of comprehensive test plans; completion
and review of all test results; and retention of an audit trail for all changes. The goal of change
management is to prevent unnecessary or unauthorized changes, assess the impact of changes on
the computing environment, and maintain necessary documentation of all changes.

The department has a change management policy that requires proper separation of duties
between development and production environments and personnel; documentation of the impact
and a detailed testing plan for the change; adequate testing of the change to determine that it
operates effectively; documentation and review of the results of the testing; and proper approval
by the business area before the change is moved. The change management policy is currently
under revision, but this version has not been finalized. However, the version that is in use
addresses the necessary controls. Early discussions with the department acknowledged that there
was no formal documentation related to the changes that were made. Based on this, we expanded
our analysis to include a larger number of changes and additional sources of potential information

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 8
about the changes, including hard-coded program comments and detailed conversations about the
changes with department staff.

The department provided us with a list of changes, which included the program being changed,
the date that the changed program was compiled into production and by whom, and a brief
description of the change. From this, we selected 35 individual changes to various LOOPS
mainframe programs related to pandemic unemployment during the period July 1, 2019 to June
9, 2021. We found two changes that were backed out and reverted to their previous versions,
which indicated weaknesses in the change control process. Not only were the steps in the change
control process not documented, but they were not performed, which resulted in issues with the
production versions. We obtained additional information about these two changes and found that
for one, sufficient testing was not performed, test results were not reviewed, nor was approval
obtained before the change was compiled into production. The other did not have a formal change
request, proper planning, testing performed, test results reviewed, or approval obtained before it
was compiled into production. Although none of the other changes we analyzed needed to be
backed out, without documentation of the various control points in the process, there is less
assurance that the appropriate process was followed for those changes, even if they were without
issue once implemented. It should be noted that neither of the changes that had to be backed out
were directly related to the processing of claims.

During the audit period, the number of LOOPS changes required increased significantly because
of the additional requirements related to unemployment claims and payments brought on by the
pandemic and subsequent federal unemployment programs. However, we found a lack of
documentation for changes completed prior to the pandemic, and the department did not begin
producing the required documentation even after the number of changes required decreased
significantly by 2022.

Having a change control policy that outlines proper controls and procedures is only effective if it
is adhered to. Failure to properly request, design, test, review, and obtain approval before
compiling changes into production can cause improper or unauthorized changes to be
implemented. This can cause the application to perform incorrectly or improperly.

Recommendation

We recommend the department enforce its existing change control policy and ensure all steps of
the procedure are being followed and properly documented. Also, when the new policy currently
in draft is completed, we recommend the department implement any additional controls and
procedures contained within it and continue to ensure that all aspects of the process are completed
and documented.



DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 9
Logical Access – Authentication

Access controls limit or detect inappropriate access to computer resources, thereby protecting
them from unauthorized modification, loss, and disclosure. Logical access authentication controls
require users to provide sufficient evidence of their identity before they are granted access to a
system. Entities are responsible for managing authentication controls to ensure that only
authorized users can access the system. Without adequate access controls, unauthorized
individuals, including outside intruders and former employees, can read and copy sensitive data
and make changes or deletions that could go undetected. Inadequate access controls also diminish
the reliability of computerized data and increase the risk of inappropriate disclosure or destruction
of that data. The department uses various authentication methods to access resources, including
Access Control Facility (ACF2), a mainframe security software that handles access control and
permission requirements to resources, for LOOPS authentication and virtual private network
(VPN) and remote desktop software for access to internal resources for users working remotely.

Mainframe user IDs belonging to separated users were not disabled in a timely manner.
We compared the listing of users who had either separated from state service or no longer worked
for the department between July 1, 2019 and June 9, 2021 with all department ACF2 user
accounts as of June 9, 2021 and found nine user accounts for separated or transferred employees
that were still active. Six of these users had been separated longer than 30 days, and seven had
access to some function in the LOOPS application. We also identified 151 user accounts that had
been previously either suspended or retired and had some level of LOOPS access. Although a
user may be listed in ACF2 with a LOOPS role, an ACF2 account that has been suspended or
retired would prevent the person from accessing the mainframe environment, thereby preventing
access to the LOOPS. Accounts that are suspended maintain their date of suspension in the ACF2
record until the account is retired, after which there is no record available to document the
suspension date. We identified 75 accounts that were suspended but not retired that we could test
for timely suspension of the ACF2 account and found 41 had been suspended more than 30 days
after separation. In addition, there were three ACF2 accounts that had been accessed after the
employee’s separation date, though that does not mean that the LOOPS application was accessed,
only the mainframe environment. All three were employees of other agencies, and two of the
three had inquiry access only.
We also matched all user accounts for separated employees, regardless of LOOPS access status,
to the RCC system records to see if any claims had been changed by the user IDs after the
employee’s separation. The RCC system does not use ACF2 for authentication, but uses the same
user ID naming convention, which allowed for the analysis. We found no instances where a
separated user ID was tied to an RCC system record after the employee’s separation date.
The SISM requires agencies to immediately disable access to systems for any separated users, as
well as review users’ access rights at least every six months, and best practice is to maintain
evidence of the completed reviews. One of the aspects of this review is to identify and revoke
access for user IDs assigned to terminated users with active access that may not have been

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 10
immediately disabled. During the pandemic, the department’s information technology area
received a large increase in the number of requests for the granting and modification of access to
accommodate the increased claims volume. This increased activity often did not use the standard
access request process established by the department and reduced the resources available to do a
periodic review.

The ACF2 automatically suspends accounts after 90 days of inactivity as a compensating control
to removing access to the LOOPS for separated users, but this does not comply with the SISM
requirements regarding separated employees and could lead to unauthorized access to the LOOPS
application by user IDs belonging to separated employees.

Recommendation

We recommend the department perform a detailed review of LOOPS access, removing user
access that is no longer needed, and include LOOPS access in its future periodic reviews. In
addition, the department should review and amend its procedure for terminated and separated
employees to ensure that both internal and external users’ access are removed timely.

Procedures and controls over remote access to state resources need to be strengthened.

Department users needing access to state resources remotely use either a virtual private network
(VPN) connection or a remote desktop application. The VPN connection allows the user to create
a secure connection to the executive branch internal network, while the remote desktop
application allows remote access to the user’s computer physically located at the department.
The department is moving away from the remote desktop product in favor of the VPN.

We compared active department VPN user accounts as of May 15, 2021 to a listing of employees
who had separated from service between July 1, 2019 and June 9, 2021 and found 18 separated
users with active accounts. Of those, one had been accessed after separation. However, because
the VPN is only access to the network, we cannot determine if any department resources were
accessed. As of the date of the listing, 15 of the 18 accounts were more than 30 days past
separation. We obtained a follow-up list of active VPN user accounts as of May 12, 2022 and
found that 16 of the 18 accounts were still active, and all 16 were more than 30 days from
separation. We also compared the follow-up list to a listing of users separating from state service
between June 9, 2021 and May 12, 2022 and identified an additional 152 new separated users
with active VPN accounts. These users were brought to the attention of the department, and the
accounts were disabled.

We compared the active department remote desktop user accounts as of May 15, 2021 to a listing
of employees who had separated from service between July 1, 2019 and June 9, 2021 and found
41 separated users with active accounts, 4 of which had been accessed after the user’s separation
date. As with the VPN, this only allows access to the user’s computer, and we were unable to
determine if any resources were accessed. As of the date of the listing, 37 of these accounts were
more than 30 days past separation. We obtained a follow-up list of remote desktop users on May
12, 2022 and found that all 41 accounts were no longer active.

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 11
The SISM requires agencies to strictly control remote access to non-public state networks, as well
as terminate remote access privileges upon a user’s separation from state service. Remote access
privileges should also be reviewed in conjunction with other regularly scheduled periodic user
account reviews.

There was an increased need for remote access to department resources during the pandemic
because of the requirement for remote work during this time, and this need continues as the
department maintains a remote work policy. During the pandemic, the department’s information
technology area received a large increase in the number of requests for remote access, and the
department has not subsequently completed a review of remote access users as of May 31, 2022.

Inadequate remote access controls could allow unauthorized access to department resources,
potentially diminishing the reliability of computerized information and increasing the risk of
unauthorized disclosure, modification, and destruction of information and disruption of service.

Recommendation

We recommend the department perform a detailed review of remote access users, removing any
access that is no longer needed, and include remote access in its future periodic reviews. In
addition, the department should review and amend its procedure for terminated and separated
employees to ensure that both internal and external users’ remote access are removed timely.



Contingency Planning

Contingency planning consists of technical and operational aspects. The technical aspects are the
processes connected to backing up and restoring an information technology system to a ready
state with minimal loss of time, functionality, and data. The operational aspects are the processes
and procedures that are used to put the agencies’ employees and customers in a position to resume
normal operations. The SISM requires agency and OIT management to develop, implement, test,
and maintain contingency plans to ensure continuity of operations for all information systems
that deliver or support essential or critical functions on behalf of the state. It also requires the
agency to update the contingency plans to address changes to the agency, system, or computing
environment.

The business continuity plan for the department and the disaster recovery plan for the
LOOPS application need to be updated.

We tested three elements of the business continuity plan and found:

1. Processing Environment: We documented all device names and network locations found
in the continuity plan and found that 6 of 55 devices noted in the processing environment
of the contingency plan did not match the current environment.

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 12
2. Staffing: We identified 37 unique staff members in the continuity plan and found that 15
of them are separated from state service. These roles and functions need to be assigned to
new individuals.

3. Network Environment: We identified 98 network locations and device names in the
continuity plan that we could independently verify. Of the 98, we identified 16 device
names that did not match the name in the plan. In addition, we reviewed the remaining
network range assigned to the department and identified 31 devices that were not in the
plan but existed on the network.

Regarding the disaster recovery plan, in June 2020 the LOOPS application was moved to a new
operating environment, which included using mainframe servers in a new physical location. The
OIT contacted the department in March 2022 with a new disaster recovery template and asked
the department to complete the new plan and schedule a test. Therefore, the current LOOPS
disaster recovery plan includes incorrect physical locations, and the application has not been
tested in the new environment.

Since the mainframe environment migration in June of 2020, the OIT disaster recovery team has
been working to update the plans for all applications hosted in that new environment. The volume
of work that the department had at the time of the migration made updating the plan not feasible,
and without an updated plan a test could not be performed. If contingency planning controls are
inadequate, even relatively minor interruptions can result in lost or incorrectly processed data,
which can cause financial losses, expensive recovery efforts, and inaccurate or incomplete
information.

Recommendation

We recommend the department review the business continuity plan and update all necessary
components, as well as complete the update of the LOOPS disaster recovery plan and perform
and test in the new environment.



DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 13
Appendix

Methodologies to Achieve Audit Objectives

In addition to the procedures outlined in the findings, we performed the following audit
procedures to reach our conclusions.

Logical Access

To determine whether controls regarding logical access were appropriate, we:

• obtained a copy of the data/information flow for the application;
• reviewed and documented system interfaces that required authentication and/or
authorization of accounts or devices in the interface;
• documented our discussions with department management and the policies, procedures,
and supporting documents related to granting, modifying, and removing user access, and
analyzed the information provided to determine compliance with applicable security
requirements;
• documented a list of “superusers” in the LOOPS application and determined if they were
appropriate;
• identified if any emergency system access was granted and that proper controls were
followed;
• reviewed documentation pertaining to the procedures for granting remote access to the
application and compared them against applicable security standards; and
• documented the password requirements for various systems and compared them against
SISM requirements.

Change Control

To determine the appropriateness and completeness of the change control environment, we:

• documented and reviewed all change control policies and procedures, as well as
determined whether these items were available to appropriate staff;
• assessed the qualifications and experience of those individuals involved in the change
control process;
• documented and reviewed the change logs for the LOOPS application and determined the
potential impact of the changes;
• extracted and reviewed job schedules, job control programs, and source code for selected
unemployment mainframe programs to determine the nature of each program’s function;
• determined if the programs outlined in the previous step had been changed during the
audit period but were not on the department’s change control listing; and
• documented all last maintenance dates for job control programs to determine if these
programs were changed during the audit period.

DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT
UNEMPLOYMENT SYSTEMS - INFORMATION TECHNOLOGY OPERATIONS

Page 14
Service Management

To determine the level of information technology service management, we:

• documented the unemployment claim workflow as well as related devices and
connections, and met with department personnel to clarify our understanding of the
workflow;
• reviewed the department’s business continuity and the LOOPS disaster recovery plans;
• documented and reviewed the business impact analyses for all components of the claims
processing environment;
• documented and discussed with management the planning for, and changes to, the
processing environment in response to the pandemic claims surge; and
• documented and discussed with management the controls and monitoring mechanisms in
place in the processing environment and obtained and reviewed any documentation about,
and results of, those mechanisms.



November 14, 2022

Brian M. Klingele, Assistant State Auditor
Office of the State Auditor
125 South Warren Street
PO Box 067
Trenton, New Jersey 08625-0067

Dear Mr. Klingele:

Thank you for providing the audit report for New Jersey Department of Labor and Workforce
Development (NJDOL), Unemployment Systems – Information Technology Operations. We
generally agree with the issues identified in the report as they pertain to the audit period. We believe
these issues have been resolved in 2022. See our detailed responses to the findings below.

Finding:  Change Control - The department had deficiencies in its change control process

NJDOL Response:  The Office of Information Management, Services and Solutions (OIMSS)
utilizes the Numara Foot Prints tool to document changes to all NJDOL environments, mainframe
and distributed, on premise, cloud and OIT managed.  This procedure was introduced as a division
standard in the summer of 2022 with the appointment of a change manager responsible for compiling
change requests from various sources internally as well as by OIT.

Weekly meetings are held to review the scope of the change, systems impacted, identify the change
owner, the staff needed to support the change and the required communication to the business areas,
customers, management team and general public.   Initially the process was developed to manage
infrastructure changes to the different environments but has expanded to include application changes
across the portfolio.

A ticket is created in the Foot Prints system for every change required.  It is the repository for the
lifetime of the change.  This includes the change requested, programmatic work performed, testing
and approval of the effort for promotion to the production environment. The Foot Prints application
documents all actions taken, the signoffs by the application development staff, the testing efforts by
Quality Assurance (QA) testing staff and the business area sign off and approval of the change. The
teams will continue to improve the documentation by using the attachment features within Foot
Prints for the inclusion of relevant documents, notes and emails associated with change control
requests. This will ensure that all documentation to support the testing and approval of system
changes is archived.

The OIMSS Change Management Policy and procedures within the policy were reviewed during the
summer of 2022 to ensure they followed the requirements and recommendations of the Statewide

2

Information Security Manual (SISM).

Finding:  Logical Access - Mainframe user IDs belonging to separated users were not disabled
in a timely manner - Procedures and controls over remote access to state resources need to be
strengthened

NJDOL Response:  The Office of Information Management, Services and Solutions is currently
reviewing the Department’s onboarding and offboarding processes to ensure that only requested and
required access levels are maintained on individuals.  Currently the Foot Prints system is being
utilized for the onboarding and offboarding processes.  The Security Team is working with the Office
of Human Capital Strategies (HCS) and the individual program areas to ensure access requests are
accurate.  All documented requests are attached to the Foot Prints tickets.  Upon the notification of
departed user from HCS, parent and child tickets are created for the termination of network access,
mainframe access and remote access.  The Security team is working with the ISRs in the other
Departments and partner agencies to ensure that all external user’s access is terminated timely.

Weekly meetings are held with the Security team lead to review all outstanding security related
tasks.  An item will be added to that meeting to review user access across all systems managed by
OIMSS on a monthly basis and the policy will be updated accordingly.

Finding:  Contingency Planning - The business continuity plan for the department and the
disaster recovery plan for the LOOPS application need to be updated

NJDOL Response:  The UI operations was aware of the need to update its contingency and disaster
recovery plan.  However, the update took a backseat to addressing the enormous volume of claims
filed as a result of the pandemic.

NJDOL Emergency Management Chief worked with NJ OIT to bring the Contingency and
Continuity of Operations plans up to date for NJDOL.  An updated NJDOL Continuity of Operations
Plan was completed in March 2020.  WAN Network Diagrams, Core Network Diagrams and LOOPS
Interface Diagrams were reviewed and updated in 2022. An updated LOOPS Business Impact
Analysis (BIA) was completed in May 2022.  An approved LOOPS Disaster Recovery Plan was
completed on June 28, 2022, to reflect the Hot Site established for the filing of UI Claims online in
the event of a disruption of normal services as well as the IBM Data Center established in Triangle
Park, North Carolina for mainframe LOOPS operations and the IBM Recovery Center that was
established in Sterling Forest New York.

An Unemployment Insurance LOOPS Disaster Recovery Exercise Guide and project plan were
developed and approved to be used for the 2022 LOOPS DR Exercise that was held during the week
of October 17, 2022. The Team is working on the After Actions Report.

The NJ Office of Homeland Security released in February 2021 an updated publication of the
Statewide Information Security Manual (SISM).  Section CP- Contingency Planning includes
Policy, Contingency Plan, Contingency Plan testing, Contingency Training, Alternate Processing
and Storage sites and System Backup and Recovery which have been considered in the annual review
and updating of the Department’s UI IT Contingency Plan.

3

All Security Policies and Administrative Directives (ADs) are undergoing their annual reviews and
updates.  This is being done in compliance with the recommendations of the NJ SISM.

If you have any questions or concerns, please contact Theresa Vallely, Director, Office of Internal
Audit at Theresa.Vallely@dol.nj.gov.

Sincerely,

Robert Asaro-Angelo
Commissioner

c:
Julie Diaz

Sharon Pagano

Gordon V. Horvath Jr.
Kathleen Bencivengo
Ron Marino

Theresa Vallely

File and source

File
REPORT_NJ-State-Auditor_DOL-UI-systems-IT-operations-pandemic_2022-11.pdf
Size
1,587,028 bytes
SHA-256
c701f695eb8d4aa968238aae5dbfe9d41ad75ce176fd865f8b841ff7440a54d1
Our copy
REPORT_NJ-State-Auditor_DOL-UI-systems-IT-operations-pandemic_2022-11.pdf
Original
pub.njleg.state.nj.us
Back to top