Pandemic Darlings The pandemic economy, in original documents
Home Court filings USA v. Smith USA v. Smith — U.S. District Court, Northern District of Illinois Notification of Docket Entry — Motion for Extension of Time Granted; Surrender Date Extended to 6/5/23 — USA v. Smith (N.D. Ill., 2023-04-11)

Court filing

Notification of Docket Entry — Motion for Extension of Time Granted; Surrender Date Extended to 6/5/23 — USA v. Smith (N.D. Ill., 2023-04-11)

Summary

Document 62, filed 04/11/23 in Case 1:20-cr-00922 in the Northern District of Illinois, is a Notification of Docket Entry recording a minute entry before the Honorable Manish S. Shah on Tuesday, April 11, 2023. The entry states that the motion for extension of time is granted as to Carlos Smith (1) and that the defendant's surrender date is extended to 6/5/23. The notice was made by the Clerk and states that notices were mailed.

Summary drafted by a model from the document's text below and checked by script against that text before publication. It is a navigation aid, not a reading of what the document proves. Where AI is used

Filed April 11, 2023 in USA v. Smith; one of 73 filings from this case.

Record facts

CourtU.S. District Court for the Northern District of Illinois
Filed2023-04-11

Cite this document

“Notification of Docket Entry — Motion for Extension of Time Granted; Surrender Date Extended to 6/5/23 — USA v. Smith (N.D. Ill., 2023-04-11).” U.S. District Court for the Northern District of Illinois, No. 1:20-cr-00922, Doc. 62, filed 2023-04-11. Archived at Pandemic Darlings, https://pandemicdarlings.com/court-filings/full-docket-carlos-smith-ilnd-394355/2023-04-11-notification-of-docket-entry-motion-for-extension-of-time-granted-surrender-date-extended-to-6-5-23-gov-uscourts-ilnd-394355-62-0/, SHA-256 3182fbf2b29a6f68b38cac16953bf8cf0c381855a1481a19f80b369ae3192e04.

Search CourtListener for this docket number

Full text

UNITED STATES DISTRICT COURT
FOR THE Northern District of Illinois − CM/ECF NextGen 1.7.1.1
Eastern Division
UNITED STATES OF AMERICA
Plaintiff,
v.
Case No.: 1:20−cr−00922
Honorable Manish S. Shah
Defendant.
NOTIFICATION OF DOCKET ENTRY
This docket entry was made by the Clerk on Tuesday, April 11, 2023:
            MINUTE entry before the Honorable Manish S. Shah: The motion for extension of
time [61] is granted as to Carlos Smith (1). Defendant's surrender date is extended to
6/5/23. Notices mailed. (psm, )
ATTENTION: This notice is being sent pursuant to Rule 77(d) of the Federal Rules of
Civil Procedure or Rule 49(c) of the Federal Rules of Criminal Procedure. It was
generated by CM/ECF, the automated docketing system used to maintain the civil and
criminal dockets of this District. If a minute order or other document is enclosed, please
refer to it for additional information.
For scheduled events, motion practices, recent opinions and other information, visit our
web site at www.ilnd.uscourts.gov.
Case: 1:20-cr-00922 Document #: 62 Filed: 04/11/23 Page 1 of 1 PageID #:432

File and source

File
gov.uscourts.ilnd.394355.62.0.pdf
Size
17,051 bytes
SHA-256
3182fbf2b29a6f68b38cac16953bf8cf0c381855a1481a19f80b369ae3192e04
Our copy
gov.uscourts.ilnd.394355.62.0.pdf
Original
PACER (login required)
Back to top